Sample records for final system requirement

  1. Medicare and Medicaid programs; fire safety requirements for long term care facilities, automatic sprinkler systems. Final rule.

    PubMed

    2008-08-13

    This final rule requires all long term care facilities to be equipped with sprinkler systems by August 13, 2013. Additionally, this final rule requires affected facilities to maintain their automatic sprinkler systems once they are installed.

  2. Requirements Analysis for the Army Safety Management Information System (ASMIS)

    DTIC Science & Technology

    1989-03-01

    8217_>’ Telephone Number « .. PNL-6819 Limited Distribution Requirements Analysis for the Army Safety Management Information System (ASMIS) Final...PNL-6819 REQUIREMENTS ANALYSIS FOR THE ARMY SAFETY MANAGEMENT INFORMATION SYSTEM (ASMIS) FINAL REPORT J. S. Littlefield A. L. Corrigan March...accidents. This accident data is available under the Army Safety Management Information System (ASMIS) which is an umbrella for many databases

  3. What is the Final Verification of Engineering Requirements?

    NASA Technical Reports Server (NTRS)

    Poole, Eric

    2010-01-01

    This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

  4. Medicare and Medicaid programs: hospital outpatient prospective payment; ambulatory surgical center payment; hospital value-based purchasing program; physician self-referral; and patient notification requirements in provider agreements. Final rule with comment period.

    PubMed

    2011-11-30

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) for CY 2012 to implement applicable statutory requirements and changes arising from our continuing experience with this system. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the OPPS. In addition, this final rule with comment period updates the revised Medicare ambulatory surgical center (ASC) payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system. In this final rule with comment period, we set forth the relative payment weights and payment amounts for services furnished in ASCs, specific HCPCS codes to which these changes apply, and other ratesetting information for the CY 2012 ASC payment system. We are revising the requirements for the Hospital Outpatient Quality Reporting (OQR) Program, adding new requirements for ASC Quality Reporting System, and making additional changes to provisions of the Hospital Inpatient Value-Based Purchasing (VBP) Program. We also are allowing eligible hospitals and CAHs participating in the Medicare Electronic Health Record (EHR) Incentive Program to meet the clinical quality measure reporting requirement of the EHR Incentive Program for payment year 2012 by participating in the 2012 Medicare EHR Incentive Program Electronic Reporting Pilot. Finally, we are making changes to the rules governing the whole hospital and rural provider exceptions to the physician self-referral prohibition for expansion of facility capacity and changes to provider agreement regulations on patient notification requirements.

  5. 48 CFR 32.605 - Final decisions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT FINANCING Contract Debts 32.605 Final decisions. (a) The contracting officer shall issue a final decision as required by 33.211 if— (1) The contracting officer and the contractor are unable... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Final decisions. 32.605...

  6. Shuttle payload S-band communications system

    NASA Technical Reports Server (NTRS)

    Batson, B. H.; Teasdale, W. E.; Pawlowski, J. F.; Schmidt, O. L.

    1985-01-01

    The Shuttle payload S-band communications system design, operational capabilities, and performance are described in detail. System design requirements, overall system and configuration and operation, and laboratory/flight test results are presented. Payload communications requirements development is discussed in terms of evolvement of requirements as well as the resulting technical challenges encountered in meeting the initial requirements. Initial design approaches are described along with cost-saving initiatives that subsequently had to be made. The resulting system implementation that was finally adopted is presented along with a functional description of the system operation. A description of system test results, problems encountered, how the problems were solved, and the system flight experience to date is presented. Finally, a summary of the advancements made and the lessons learned is discussed.

  7. 77 FR 18709 - Quality Assurance Requirements for Continuous Opacity Monitoring Systems at Stationary Sources

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... Quality Assurance Requirements for Continuous Opacity Monitoring Systems at Stationary Sources AGENCY... direct final rule titled ``Quality Assurance Requirements for Continuous Opacity Monitoring Systems at...--Quality Assurance Requirements for Continuous Opacity Monitoring Systems at Stationary Sources Docket, EPA...

  8. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  9. 77 FR 29247 - Federal Motor Vehicle Safety Standards; Occupant Crash Protection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ...). ACTION: Final rule; technical amendments. SUMMARY: This final rule makes technical amendments to Federal... advanced air bag requirements. As written now, the general warning label requirements contain an explicit... equipment requirements for restraint systems. This document makes technical amendments to several of the...

  10. Dynamic mobility applications open source application development portal : Task 4 : system requirements specifications : final report.

    DOT National Transportation Integrated Search

    2016-10-12

    This document describes the System Requirements Specifications (SyRS) of the Dynamic Mobility Applications (DMA) Open Source Application Development Portal (OSADP) system in details according to IEEE-Std. 1233-1998. The requirement statements discuss...

  11. Final cooling for a high-energy high-luminosity lepton collider

    NASA Astrophysics Data System (ADS)

    Neuffer, D.; Sayed, H.; Acosta, J.; Hart, T.; Summers, D.

    2017-07-01

    A high-energy muon collider requires a "final cooling" system that reduces transverse emittance by a factor of ~ 10, while allowing the longitudinal emittance to increase. The baseline approach has low-energy transverse cooling within high-field solenoids, with strong longitudinal heating. This approach and its recent simulation are discussed. Alternative approaches, which more explicitly include emittance exchange are also presented. Round-to-flat beam transform, transverse slicing, and longitudinal bunch coalescence are possible components of an alternative approach. Wedge-based emittance exchange could provide much of the required transverse cooling with longitudinal heating. Li-lens and quadrupole focusing systems could also provide much of the required final cooling.

  12. Medicare program; hospital outpatient prospective payment system and CY 2007 payment rates; CY 2007 update to the ambulatory surgical center covered procedures list; Medicare administrative contractors; and reporting hospital quality data for FY 2008 inpatient prospective payment system annual payment update program--HCAHPS survey, SCIP, and mortality. Final rule with comment period and final rule.

    PubMed

    2006-11-24

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system, and to implement certain related provisions of the Medicare Prescription Drug, Improvement, and Modernization Act (MMA) of 2003 and the Deficit Reduction Act (DRA) of 2005. In this final rule with comment period, we describe changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2007. In addition, this final rule with comment period implements future CY 2009 required reporting on quality measures for hospital outpatient services paid under the prospective payment system. This final rule with comment period revises the current list of procedures that are covered when furnished in a Medicare-approved ambulatory surgical center (ASC), which are applicable to services furnished on or after January 1, 2007. This final rule with comment period revises the emergency medical screening requirements for critical access hospitals (CAHs). This final rule with comment period supports implementation of a restructuring of the contracting entities responsibilities and functions that support the adjudication of Medicare fee-for-service (FFS) claims. This restructuring is directed by section 1874A of the Act, as added by section 911 of the MMA. The prior separate Medicare intermediary and Medicare carrier contracting authorities under Title XVIII of the Act have been replaced with the Medicare Administrative Contractor (MAC) authority. This final rule continues to implement the requirements of the DRA that require that we expand the "starter set" of 10 quality measures that we used in FY 2005 and FY 2006 for the hospital inpatient prospective payment system (IPPS) Reporting Hospital Quality Data for the Annual Payment Update (RHQDAPU) program. We began to adopt expanded measures effective for payments beginning in FY 2007. In this rule, we are finalizing additional quality measures for the expanded set of measures for FY 2008 payment purposes. These measures include the HCAHPS survey, as well as Surgical Care Improvement Project (SCIP, formerly Surgical Infection Prevention (SIP)), and Mortality quality measures.

  13. Connected Vehicle Pilot Deployment Program phase 1 : System Requirements Specification (SyRS) : Tampa (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This document describes the System Requirements Specification (SyRS) for the Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment. This SyRS describes the current system requirements derived from the user needs, Conc...

  14. Spacecraft System Integration and Test: SSTI Lewis critical design audit

    NASA Technical Reports Server (NTRS)

    Brooks, R. P.; Cha, K. K.

    1995-01-01

    The Critical Design Audit package is the final detailed design package which provides a comprehensive description of the SSTI mission. This package includes the program overview, the system requirements, the science and applications activities, the ground segment development, the assembly, integration and test description, the payload and technology demonstrations, and the spacecraft bus subsystems. Publication and presentation of this document marks the final requirements and design freeze for SSTI.

  15. Effective date of requirement for premarket approval for automated external defibrillator systems. Final rule.

    PubMed

    2015-01-29

    The Food and Drug Administration (FDA or the Agency) is issuing a final order to require the filing of premarket approval applications (PMA) for automated external defibrillator (AED) systems, which consist of an AED and those AED accessories necessary for the AED to detect and interpret an electrocardiogram and deliver an electrical shock (e.g., pad electrodes, batteries, adapters, and hardware keys for pediatric use).

  16. I-880 Integrated Corridor Management ICM System Requirements : Final Submittal : System Requirement Specification for the I-880 Corridor in Oakland, California

    DOT National Transportation Integrated Search

    2008-03-31

    This document summarizes the efforts conducted by the I-880 ICM team for the development of the system requirements for the I-880 Integrated Corridor Management System (ICMS). It describes the approach that the I-880 team took in defining the ICMS an...

  17. Sharing data between mobile devices, connected vehicles, and infrastructure task 3: system requirements specifications (SyRS) final.

    DOT National Transportation Integrated Search

    2016-07-14

    This report describes the system requirements specifications (SyRS) for the use of mobile devices in a connected vehicle environment. Specifically, it defines the different types of requirements (functional, interface, performance, security, data, an...

  18. Final design review summary report for the TN-WHC cask and transportation system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kee, A.T.

    1997-01-17

    This document represents comments generated from a review of Transnuclear`s Final Design Package distributed on December 10, 1996 and a review of the Final Design Analysis Report meeting held on December 17 & 18, 1996. The Final design describes desicn features and presents final analyses @j performed to fabricate and operate the system while meeting the Cask/Transportation Functions and Requirements, WHC-SD-SNF-FRD-011, Rev. 0 and specification WHC-S-0396, Rev. 1.

  19. Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Short Inpatient Hospital Stays; Transition for Certain Medicare-Dependent, Small Rural Hospitals Under the Hospital Inpatient Prospective Payment System; Provider Administrative Appeals and Judicial Review. Final rule with comment period; final rule.

    PubMed

    2015-11-13

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2016 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program and the ASC Quality Reporting (ASCQR) Program. Further, this document includes certain finalized policies relating to the hospital inpatient prospective payment system: Changes to the 2-midnight rule under the short inpatient hospital stay policy; and a payment transition for hospitals that lost their status as a Medicare-dependent, small rural hospital (MDH) because they are no longer in a rural area due to the implementation of the new Office of Management and Budget delineations in FY 2015 and have not reclassified from urban to rural before January 1, 2016. In addition, this document contains a final rule that finalizes certain 2015 proposals, and addresses public comments received, relating to the changes in the Medicare regulations governing provider administrative appeals and judicial review relating to appropriate claims in provider cost reports.

  20. 46 CFR 112.20-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...

  1. 46 CFR 112.20-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...

  2. 46 CFR 112.20-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...

  3. 46 CFR 112.20-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...

  4. 46 CFR 112.20-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Systems Having a Temporary and a Final Emergency Power Source § 112.20-1 General. This subpart contains requirements applicable to emergency power installations having both a temporary and a final...

  5. Medicare program; home health prospective payment system rate update for calendar year 2011; changes in certification requirements for home health agencies and hospices. Final rule.

    PubMed

    2010-11-17

    This final rule sets forth an update to the Home Health Prospective Payment System (HH PPS) rates, including: the national standardized 60-day episode rates, the national per-visit rates, the nonroutine medical supply (NRS) conversion factors, and the low utilization payment amount (LUPA) add-on payment amounts, under the Medicare prospective payment system for HHAs effective January 1, 2011. This rule also updates the wage index used under the HH PPS and, in accordance with the Patient Protection and Affordable Care Act of 2010 (Affordable Care Act), updates the HH PPS outlier policy. In addition, this rule revises the home health agency (HHA) capitalization requirements. This rule further adds clarifying language to the "skilled services" section. The rule finalizes a 3.79 percent reduction to rates for CY 2011 to account for changes in case-mix, which are unrelated to real changes in patient acuity. Finally, this rule incorporates new legislative requirements regarding face-to-face encounters with providers related to home health and hospice care.

  6. 76 FR 44829 - Federal Motor Vehicle Safety Standards; Air Brake Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... [Docket No. NHTSA-2009-0175] RIN 2127-AK84 Federal Motor Vehicle Safety Standards; Air Brake Systems... final rule that amended the Federal motor vehicle safety standard for air brake systems by requiring... July 27, 2009, NHTSA published a final rule in the Federal Register amending Federal Motor Vehicle...

  7. Microwave Landing System signal requirements for conventional aircraft

    DOT National Transportation Integrated Search

    1972-07-01

    The results of analysis directed towards determining Microwave Landing System (MLS) signal requirements for conventional aircraft are discussed. The phases of flight considered include straight-in final approach, flareout, and rollout. A limited numb...

  8. Digital Avionics Information System (DAIS): Training Requirements Analysis Model Users Guide. Final Report.

    ERIC Educational Resources Information Center

    Czuchry, Andrew J.; And Others

    This user's guide describes the functions, logical operations and subroutines, input data requirements, and available outputs of the Training Requirements Analysis Model (TRAMOD), a computerized analytical life cycle cost modeling system for use in the early stages of system design. Operable in a stand-alone mode, TRAMOD can be used for the…

  9. USDOT Guidance Summary for Connected Vehicle Deployments : System Requirements and the CVRIA/Set-It Tool : Final Report

    DOT National Transportation Integrated Search

    2016-07-01

    This document provides guidance material in regards to System Requirements for the CV Pilots Deployment Concept Development Phase. Methods for system engineering are discussed with definitions for the successful management of each aspect. Important r...

  10. 76 FR 57646 - Final Withdrawal of Certain Federal Aquatic Life Water Quality Criteria Applicable to Wisconsin

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... limits in National Pollutant Discharge Elimination System (NPDES) permits, and may affect Clean Water Act... the final Water Quality Guidance for the Great Lakes System (Guidance), required by CWA Section 118(c... waters of the Great Lakes System in Wisconsin designated as Warm Water Sportfish and Warm Water Forage...

  11. ATMS concept of operations and generic system requirements : task B : final interim report for design of support systems for advanced traffic management systems

    DOT National Transportation Integrated Search

    1993-10-01

    This document describes the Concept of Operations and Generic System Requirements for : the next generation of Traffic Management Centers (TMC). Four major steps comprise the : development of this Concept of Operations. The first step was to survey t...

  12. Rail fixed guideway systems : state safety oversight : final rule

    DOT National Transportation Integrated Search

    1995-12-27

    As required by the Intermodal Surface Transportation Efficiency Act of 1991, the Federal Transit Administration (FTA) issues a rule requiring states to oversee the safety of rail fixed guideway systems not regulated by the Federal Railroad Administra...

  13. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2015.

    PubMed

    2014-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2015 as required by the statute. This final rule finalizes a policy to collect data on the amount and mode (that is, Individual, Concurrent, Group, and Co-Treatment) of therapy provided in the IRF setting according to therapy discipline, revises the list of diagnosis and impairment group codes that presumptively meet the "60 percent rule'' compliance criteria, provides a way for IRFs to indicate on the Inpatient Rehabilitation Facility-Patient Assessment Instrument (IRF-PAI) form whether the prior treatment and severity requirements have been met for arthritis cases to presumptively meet the "60 percent rule'' compliance criteria, and revises and updates quality measures and reporting requirements under the IRF quality reporting program (QRP). This rule also delays the effective date for the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that were finalized in FY 2014 IRF PPS final rule and adopts the revisions to the list of diagnosis codes that are used to determine presumptive compliance under the "60 percent rule'' that are finalized in this rule. This final rule also addresses the implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), for the IRF prospective payment system (PPS), which will be effective when ICD-10-CM becomes the required medical data code set for use on Medicare claims and IRF-PAI submissions.

  14. Parameter Requirements for Description of Alternative LINC Systems. Final Report.

    ERIC Educational Resources Information Center

    Center for Applied Linguistics, Washington, DC. Language Information Network and Clearinghouse System.

    This study was undertaken for the Center for Applied Linguistics to survey and analyze its information system program for the language sciences. The study identifies and defines the generalized sets of parameters required for subsequent quantitative analysis of proposed alternative Language Information Network and Clearinghouse Systems by means of…

  15. Space station electric power system requirements and design

    NASA Technical Reports Server (NTRS)

    Teren, Fred

    1987-01-01

    An overview of the conceptual definition and design of the space station Electric Power System (EPS) is given. Responsibilities for the design and development of the EPS are defined. The EPS requirements are listed and discussed, including average and peak power requirements, contingency requirements, and fault tolerance. The most significant Phase B trade study results are summarized, and the design selections and rationale are given. Finally, the power management and distribution system architecture is presented.

  16. SRB/SLEEC (Solid Rocket Booster/Shingle Lap Extendible Exit Cone) feasibility study, volume 2. Appendix A: Design study for a SLEEC actuation system

    NASA Technical Reports Server (NTRS)

    Thompson, D. S.

    1986-01-01

    The results are presented of a design feasibility study of a self-contained (powered) actuation system for a Shingle Lap Extendible Exit Cone (SLEEC) for Transportation System (STS). The evolution of the SLEEC actuation system design is reviewed, the final design concept is summarized, and the results of the detailed study of the final concept of the actuation system are treated. A conservative design using proven mechanical components was established as a major program priority. The final mechanical design has a very low development risk since the components, which consist of ballscrews, gearing, flexible shaft drives, and aircraft cables, have extensive aerospace applications and a history of proven reliability. The mathematical model studies have shown that little or no power is required to deploy the SLEEC actuation system because acceleration forces and internal pressure from the rocket plume provide the required energies. A speed control brake is incorporated in the design in order to control the rate of deployment.

  17. Radiation Requirements and Requirements Flowdown: Single Event Effects (SEEs) and Requirements

    NASA Technical Reports Server (NTRS)

    LaBel, Kenneth A.

    2002-01-01

    This short course session provides: (1) an overview of the single particle-induced hazard for space system as they apply in the natural space environment. This shall focus on the implementation of a single event effect hardness assurance (SEEHA) program for systems including system engineering approach and mitigation of effects. (2) The final portion of this session shell provide relevant real-life examples of in-flight performance of systems.

  18. Medicare Program: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Organ Procurement Organization Reporting and Communication; Transplant Outcome Measures and Documentation Requirements; Electronic Health Record (EHR) Incentive Programs; Payment to Nonexcepted Off-Campus Provider-Based Department of a Hospital; Hospital Value-Based Purchasing (VBP) Program; Establishment of Payment Rates Under the Medicare Physician Fee Schedule for Nonexcepted Items and Services Furnished by an Off-Campus Provider-Based Department of a Hospital. Final rule with comment period and interim final rule with comment period.

    PubMed

    2016-11-14

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2017 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program and the ASC Quality Reporting (ASCQR) Program. Further, in this final rule with comment period, we are making changes to tolerance thresholds for clinical outcomes for solid organ transplant programs; to Organ Procurement Organizations (OPOs) definitions, outcome measures, and organ transport documentation; and to the Medicare and Medicaid Electronic Health Record Incentive Programs. We also are removing the HCAHPS Pain Management dimension from the Hospital Value-Based Purchasing (VBP) Program. In addition, we are implementing section 603 of the Bipartisan Budget Act of 2015 relating to payment for certain items and services furnished by certain off-campus provider-based departments of a provider. In this document, we also are issuing an interim final rule with comment period to establish the Medicare Physician Fee Schedule payment rates for the nonexcepted items and services billed by a nonexcepted off-campus provider-based department of a hospital in accordance with the provisions of section 603.

  19. Medicare and Medicaid Programs; CY 2016 Home Health Prospective Payment System Rate Update; Home Health Value-Based Purchasing Model; and Home Health Quality Reporting Requirements. Final rule.

    PubMed

    2015-11-05

    This final rule will update Home Health Prospective Payment System (HH PPS) rates, including the national, standardized 60-day episode payment rates, the national per-visit rates, and the non-routine medical supply (NRS) conversion factor under the Medicare prospective payment system for home health agencies (HHAs), effective for episodes ending on or after January 1, 2016. As required by the Affordable Care Act, this rule implements the 3rd year of the 4-year phase-in of the rebasing adjustments to the HH PPS payment rates. This rule updates the HH PPS case-mix weights using the most current, complete data available at the time of rulemaking and provides a clarification regarding the use of the "initial encounter'' seventh character applicable to certain ICD-10-CM code categories. This final rule will also finalize reductions to the national, standardized 60-day episode payment rate in CY 2016, CY 2017, and CY 2018 of 0.97 percent in each year to account for estimated case-mix growth unrelated to increases in patient acuity (nominal case-mix growth) between CY 2012 and CY 2014. In addition, this rule implements a HH value-based purchasing (HHVBP) model, beginning January 1, 2016, in which all Medicare-certified HHAs in selected states will be required to participate. Finally, this rule finalizes minor changes to the home health quality reporting program and minor technical regulations text changes.

  20. 77 FR 30366 - Defense Federal Acquisition Regulation Supplement: Contingency Contract Closeout (DFARS Case 2012...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... DEPARTMENT OF DEFENSE Defense Acquisition Regulations System 48 CFR Part 204 RIN 0750-AH71 Defense...: Defense Acquisition Regulations System, Department of Defense (DoD). ACTION: Final rule. SUMMARY: DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to require...

  1. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix D: Life sciences research facility requirements

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    The purpose of this requirements document is to develop the foundation for concept development for the Life Sciences Research Facility (LSRF) on the Space Station. These requirements are developed from the perspective of a Space Station laboratory module outfitter. Science and mission requirements including those related to specimens are set forth. System requirements, including those for support, are detailed. Functional and design requirements are covered in the areas of structures, mechanisms, electrical power, thermal systems, data management system, life support, and habitability. Finally, interface requirements for the Command Module and Logistics Module are described.

  2. 76 FR 11415 - Federal Motor Vehicle Safety Standards; Power-Operated Window, Partition, and Roof Panel Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... automatic reversal systems (ARS) for power windows and to make a final decision. The agency has decided not... requirements for automatic reversal systems (ARS) and are withdrawing our 2009 proposal regarding ARS. This... of proposed rulemaking (NPRM) proposing new requirements for ARS. The proposal discussed the agency's...

  3. Advanced Command Destruct System (ACDS) Enhanced Flight Termination System (EFTS)

    NASA Technical Reports Server (NTRS)

    Tow, David

    2009-01-01

    NASA Dryden started working towards a single vehicle enhanced flight termination system (EFTS) in January 2008. NASA and AFFTC combined their efforts to work towards final operating capability for multiple vehicle and multiple missions simultaneously, to be completed by the end of 2011. Initially, the system was developed to support one vehicle and one frequency per mission for unmanned aerial vehicles (UAVs) at NASA Dryden. By May 2008 95% of design and hardware builds were completed, however, NASA Dryden's change of software safety scope and requirements caused delays after May 2008. This presentation reviews the initial and final operating capabilities for the Advanced Command Destruct System (ACDS), including command controller and configuration software development. A requirements summary is also provided.

  4. Comprehensive Child Welfare Information System. Final rule.

    PubMed

    2016-06-02

    This final rule replaces the Statewide and Tribal Automated Child Welfare Information Systems (S/TACWIS) rule with the Comprehensive Child Welfare Information System (CCWIS) rule. The rule also makes conforming amendments in rules in related requirements. This rule will assist title IV-E agencies in developing information management systems that leverage new innovations and technology in order to better serve children and families. More specifically, this final rule supports the use of cost-effective, innovative technologies to automate the collection of high-quality case management data and to promote its analysis, distribution, and use by workers, supervisors, administrators, researchers, and policy makers.

  5. 75 FR 18725 - Organization; Eligibility and Scope of Financing; Funding and Fiscal Affairs, Loan Policies and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ...The Farm Credit Administration (FCA or we) issues this final rule on Farm Credit System (System) bank and association director elections and other voting procedures. The final rule clarifies director election processes and updates FCA regulations to incorporate interpretations made through bookletters to System institutions. It also consolidates general election procedures, clarifies the role of nominating committees, enhances eligibility and disclosure requirements for director candidates, and improves annual meeting information statement instructions. The final rule also adds new regulations on floor nominations and meetings of stockholders. We expect this final rule will increase stockholder participation, enhance impartiality, and strengthen disclosures in director elections.

  6. The Requirement Generation for the SKYLON Launch System

    NASA Astrophysics Data System (ADS)

    Hempsell, M.

    SKYLON is a reusable single stage to orbit spaceplane intended to lower the cost of reaching space. The project has a 25 year history stretching back to the British Aerospace HOTOL study and over the many configuration iterations the performance has been established using feasibility designs, with market studies being used to establish that the resulting system has utility. In preparation for the final concept study of the D1 configuration the market and other stakeholder's requirements have been prepared as an input rather than an output to the design process. These requirements have been established from both an analysis of the existing market - as a model for the entry into service requirements - and future studies of advanced applications - as a model for the longer term requirements. The final conclusions have been incorporated into a preliminary User Manual which is the basis of a requirements' validation exercise.

  7. Medicare and Medicaid programs; CY 2015 Home Health Prospective Payment System rate update; Home Health Quality Reporting Requirements; and survey and enforcement requirements for home health agencies. Final rule.

    PubMed

    2014-11-06

    This final rule updates Home Health Prospective Payment System (HH PPS) rates, including the national, standardized 60-day episode payment rates, the national per-visit rates, and the non-routine medical supply (NRS) conversion factor under the Medicare prospective payment system for home health agencies (HHAs), effective for episodes ending on or after January 1, 2015. As required by the Affordable Care Act, this rule implements the second year of the four-year phase-in of the rebasing adjustments to the HH PPS payment rates. This rule provides information on our efforts to monitor the potential impacts of the rebasing adjustments and the Affordable Care Act mandated face-to-face encounter requirement. This rule also implements: Changes to simplify the face-to-face encounter regulatory requirements; changes to the HH PPS case-mix weights; changes to the home health quality reporting program requirements; changes to simplify the therapy reassessment timeframes; a revision to the Speech-Language Pathology (SLP) personnel qualifications; minor technical regulations text changes; and limitations on the reviewability of the civil monetary penalty provisions. Finally, this rule also discusses Medicare coverage of insulin injections under the HH PPS, the delay in the implementation of the International Classification of Diseases, Tenth Revision, Clinical Modification (ICD-10-CM), and a HH value-based purchasing (HH VBP) model.

  8. 76 FR 70227 - Medicare Program; End-Stage Renal Disease Prospective Payment System and Quality Incentive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-10

    ...This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  9. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  10. 76 FR 55384 - Notice of Decision Not To Reissue National Pollutant Discharge Elimination System (NPDES) General...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ... Discharge Elimination System (NPDES) General Permit for the Final Beneficial Reuse or Disposal of Municipal... intend to reissue the NPDES General Permit for the Final Beneficial Reuse or Disposal of Municipal Sewage... part except in accordance with such requirements. Authority: Clean Water Act, 33 U.S.C. 1251 et seq...

  11. Development of Subscale Fast Cookoff Test (PREPRINT)

    DTIC Science & Technology

    2006-09-21

    The hazards classification procedures have been harmonized with both the UN Test and Criteria Manual for UN Series 1...aimed at the development of a sub-scale alternate test protocol to the external fire test currently required for final hazards classification (HC...external fire test currently required for final hazards classification (HC) of an ordnance system. The specific goal of this part of the task was

  12. Instructional System Development (ISD) in the Armed Services: Methodology and Application. Final Report, August 25, 1977 through March 19, 1979.

    ERIC Educational Resources Information Center

    Vineberg, Robert; Joyner, John N.

    Instructional System Development (ISD) methodologies and practices were examined in the Army, Navy, Marine Corps, and Air Force, each of which prescribes the ISD system involving rigorous derivation of training requirements from job requirements, selection of instructional strategies to maximize training efficiency, and revision of instruction…

  13. Functional Design of an Automated Instructional Support System for Operational Flight Trainers. Final Report, June 1976 through September 1977.

    ERIC Educational Resources Information Center

    Semple, Clarence A.; And Others

    Functional requirements for a highly automated, flexible, instructional support system for aircrew training simulators are presented. Automated support modes and associated features and capabilities are described, along with hardware and software functional requirements for implementing a baseline system in an operational flight training context.…

  14. Scalable Quantum Information Processing and Applications

    DTIC Science & Technology

    2008-01-19

    qubit logic gates, and finally emitting an entangled photon from the single- photon emitter. For the program, we proposed to demonstrate the...coherent, single photon transmitter/receiver system. These requirements included careful tailoring of the g factor for conduction band electrons in...physics required for the realization of a spin-coherent, single photon transmitter/receiver system. These requirements included careful tailoring of

  15. Molding cork sheets to complex shapes

    NASA Technical Reports Server (NTRS)

    Sharpe, M. H.; Simpson, W. G.; Walker, H. M.

    1977-01-01

    Partially cured cork sheet is easily formed to complex shapes and then final-cured. Temperature and pressure levels required for process depend upon resin system used and final density and strength desired. Sheet can be bonded to surface during final cure, or can be first-formed in mold and bonded to surface in separate step.

  16. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Final rule.

    PubMed

    2006-09-22

    This final rule adopts the substance of the April 15, 2004 tentative interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment allows certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This final rule also requires that nursing facilities at least install battery-operated single station smoke alarms in resident rooms and common areas if they are not fully sprinklered or they do not have system-based smoke detectors in those areas. Finally, this final rule confirms as final the provisions of the March 25, 2005 interim final rule with changes and responds to public comments on that rule.

  17. Passive millimeter-wave imaging

    NASA Technical Reports Server (NTRS)

    Young, Stephen K.; Davidheiser, Roger A.; Hauss, Bruce; Lee, Paul S. C.; Mussetto, Michael; Shoucri, Merit M.; Yujiri, Larry

    1993-01-01

    Millimeter-wave hardware systems are being developed. Our approach begins with identifying and defining the applications. System requirements are then specified based on mission needs using our end-to-end performance model. The model was benchmarked against existing data bases and, where data is deficient, it is acquired via field measurements. The derived system requirements are then validated with the appropriate field measurements using our imaging testbeds and hardware breadboards. The result is a final system that satisfies all the requirements of the target mission.

  18. Specification and simulation of behavior of the Continuous Infusion Insulin Pump system.

    PubMed

    Babamir, Seyed Morteza; Dehkordi, Mehdi Borhani

    2014-01-01

    Continuous Infusion Insulin Pump (CIIP) system is responsible for monitoring diabetic blood sugar. In this paper, we aim to specify and simulate the CIIP software behavior. To this end, we first: (1) presented a model consisting of the CIIP system behavior in response to its environment (diabetic) behavior and (2) we formally defined the safety requirements of the system environment (diabetic) in the Z formal modeling language. Such requirements should be satisfied by the CIIP software. Finally, we programmed the model and requirements.

  19. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the...) Maintaining and operating the gas monitoring system in accordance with the requirements of § 258.23. (b) The... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  20. Occupational injury and illness recording and reporting requirements--NAICS update and reporting revisions. Final rule.

    PubMed

    2014-09-18

    OSHA is issuing a final rule to update the appendix to its Injury and Illness Recording and Reporting regulation. The appendix contains a list of industries that are partially exempt from requirements to keep records of work-related injuries and illnesses due to relatively low occupational injury and illness rates. The updated appendix is based on more recent injury and illness data and lists industry groups classified by the North American Industry Classification System (NAICS). The current appendix lists industries classified by Standard Industrial Classification (SIC). The final rule also revises the requirements for reporting work-related fatality, injury, and illness information to OSHA. The current regulation requires employers to report work-related fatalities and in-patient hospitalizations of three or more employees within eight hours of the event. The final rule retains the requirement for employers to report work-related fatalities to OSHA within eight hours of the event but amends the regulation to require employers to report all work-related in-patient hospitalizations, as well as amputations and losses of an eye, to OSHA within 24 hours of the event.

  1. Wedge Absorbers for Final Cooling for a High-Energy High-Luminosity Lepton Collider

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuffer, David; Mohayai, Tanaz; Snopok, Pavel

    2016-06-01

    A high-energy high-luminosity muon collider scenario requires a "final cooling" system that reduces transverse emittance to ~25 microns (normalized) while allowing longitudinal emittance increase. Ionization cooling using high-field solenoids (or Li Lens) can reduce transverse emittances to ~100 microns in readily achievable configurations, confirmed by simulation. Passing these muon beams at ~100 MeV/c through cm-sized diamond wedges can reduce transverse emittances to ~25 microns, while increasing longitudinal emittance by a factor of ~5. Implementation will require optical matching of the exiting beam into downstream acceleration systems.

  2. Task Analysis and Descriptions of Required Job Competencies for Robotics/Automated Systems Technicians. Final Report. Volume 2. Curriculum Planning Guide.

    ERIC Educational Resources Information Center

    Hull, Daniel M.; Lovett, James E.

    This volume of the final report for the Robotics/Automated Systems Technician (RAST) curriculum project is a curriculum planning guide intended for school administrators, faculty, and student counselors/advisors. It includes step-by-step procedures to help institutions evaluate their community's needs and their capabilities to meet these needs in…

  3. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-11-01

    The full title of this study is 'Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirements Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.

  4. SP-100 Program: space reactor system and subsystem investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harty, R.B.

    1983-09-30

    For a space reactor power system, a comprehensive safety program will be required to assure that no undue risk is present. This report summarizes the nuclear safety review/approval process that will be required for a space reactor system. The documentation requirements are presented along with a summary of the required contents of key documents. Finally, the aerospace safety program conducted for the SNAP-10A reactor system is summarized. The results of this program are presented to show the type of program that can be expected and to provide information that could be usable in future programs.

  5. SP-100 program: Space reactor system and subsystem investigations

    NASA Astrophysics Data System (ADS)

    Harty, R. B.

    1983-09-01

    For a space reactor power system, a comprehensive safety program will be required to assure that no undue risk is present. The nuclear safety review/approval process that is required for a space reactor system is summarized. The documentation requirements are presented along with a summary of the required contents of key documents. Finally, the aerospace safety program conducted for the SNAP-10A reactor system is summarized. The results of this program are presented to show the type of program that is expected and to provide information that could be usable in future programs.

  6. 75 FR 50930 - Final Determination To Approve Alternative Final Cover Request for the Lake County, Montana Landfill

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... infiltration and erosion. The regulation requires final cover systems to be designed and constructed to: (1... infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum of 18 inches... that includes: (1) An infiltration layer that achieves an equivalent reduction in infiltration as the...

  7. Human factors issues in telerobotic systems for Space Station Freedom servicing

    NASA Technical Reports Server (NTRS)

    Malone, Thomas B.; Permenter, Kathryn E.

    1990-01-01

    Requirements for Space Station Freedom servicing are described and the state-of-the-art for telerobotic system on-orbit servicing of spacecraft is defined. The projected requirements for the Space Station Flight Telerobotic Servicer (FTS) are identified. Finally, the human factors issues in telerobotic servicing are discussed. The human factors issues are basically three: the definition of the role of the human versus automation in system control; the identification of operator-device interface design requirements; and the requirements for development of an operator-machine interface simulation capability.

  8. Solar Hot Water for an Industrial Laundry--Fresno, California

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Final report describes an integrated wastewater-heat recovery system and solar preheating system to supply part of hot-water requirements of an industrial laundry. Large retrofit solar-water-heating system uses lightweight collectors.

  9. Medicare and Medicaid programs: Hospital Outpatient Prospective Payment and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; electronic reporting pilot; Inpatient Rehabilitation Facilities Quality Reporting Program; revision to Quality Improvement Organization regulations. Final rule with comment period.

    PubMed

    2012-11-15

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system (OPPS) and the Medicare ambulatory surgical center (ASC) payment system for CY 2013 to implement applicable statutory requirements and changes arising from our continuing experience with these systems. In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare services paid under the OPPS and those paid under the ASC payment system. In addition, this final rule with comment period updates and refines the requirements for the Hospital Outpatient Quality Reporting (OQR) Program, the ASC Quality Reporting (ASCQR) Program, and the Inpatient Rehabilitation Facility (IRF) Quality Reporting Program. We are continuing the electronic reporting pilot for the Electronic Health Record (EHR) Incentive Program, and revising the various regulations governing Quality Improvement Organizations (QIOs), including the secure transmittal of electronic medical information, beneficiary complaint resolution and notification processes, and technical changes. The technical changes to the QIO regulations reflect CMS' commitment to the general principles of the President's Executive Order on Regulatory Reform, Executive Order 13563 (January 18, 2011).

  10. Proposing Electronic Health Record Usability Requirements Based on Enriched ISO 9241 Metric Usability Model

    PubMed Central

    Farzandipour, Mehrdad; Riazi, Hossein; Jabali, Monireh Sadeqi

    2018-01-01

    Introduction: System usability assessment is among the important aspects in assessing the quality of clinical information technology, especially when the end users of the system are concerned. This study aims at providing a comprehensive list of system usability. Methods: This research is a descriptive cross-sectional one conducted using Delphi technique in three phases in 2013. After experts’ ideas were concluded, the final version of the questionnaire including 163 items in three phases was presented to 40 users of information systems in hospitals. The grading ranged from 0-4. Data analysis was conducted using SPSS software. Those requirements with a mean point of three or higher were finally confirmed. Results: The list of system usability requirements for electronic health record was designed and confirmed in nine areas including suitability for the task (24 items), self-descriptiveness (22 items), controllability (19 questions), conformity with user expectations (25 items), error tolerance (21 items), suitability for individualization (7 items), suitability for learning (19 items), visual clarity (18 items) and auditory presentation (8 items). Conclusion: A relatively comprehensive model including useful requirements for using EHR was presented which can increase functionality, effectiveness and users’ satisfaction. Thus, it is suggested that the present model be adopted by system designers and healthcare system institutions to assess those systems. PMID:29719310

  11. 77 FR 23396 - Revisions to the Requirements for Authority To Manufacture and Distribute Postage Evidencing Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... POSTAL SERVICE 39 CFR Part 501 Revisions to the Requirements for Authority To Manufacture and Distribute Postage Evidencing Systems AGENCY: Postal Service TM . ACTION: Final rule. SUMMARY: This rule... causing denial-of-service attacks on Web sites. Cyber attacks may be carried out by third parties or...

  12. 76 FR 17287 - Protocol Gas Verification Program and Minimum Competency Requirements for Air Emission Testing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ...EPA is finalizing rule revisions that modify existing requirements for sources affected by the federally administered emission trading programs including the NOX Budget Trading Program, the Acid Rain Program, and the Clean Air Interstate Rule. EPA is amending its Protocol Gas Verification Program (PGVP) and the minimum competency requirements for air emission testing (formerly air emission testing body requirements) to improve the accuracy of emissions data. EPA is also amending other sections of the Acid Rain Program continuous emission monitoring system regulations by adding and clarifying certain recordkeeping and reporting requirements, removing the provisions pertaining to mercury monitoring and reporting, removing certain requirements associated with a class-approved alternative monitoring system, disallowing the use of a particular quality assurance option in EPA Reference Method 7E, adding two incorporation by references that were inadvertently left out of the January 24, 2008 final rule, adding two new definitions, revising certain compliance dates, and clarifying the language and applicability of certain provisions.

  13. Computer Applications Group FY91 final report, February 11, 1991--September 30, 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-02-24

    This Functional Requirements Document (FRD) defines the functional requirements and general solutions required for design of the Integrated Data System (IDS). The FRD is the primary source of requirements for the designers and all requirements used in the design process shall be part of this or succeeding revisions of the FRD with no exceptions.

  14. State of Texas regional ITS architectures : El Paso region, executive summary

    DOT National Transportation Integrated Search

    2003-10-27

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  15. Tracking and data relay satellite system configuration and tradeoff study. Volume 4: TDRS system operation and control and telecommunications service system, part 1

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Major study areas treated in this volume are: 1) operations and control and 2) the telecommunication service system. The TDRS orbit selection, orbital deployment, ground station visibility, sequence of events from launch to final orbit position, and TDRS control center functions required for stationkeeping, repositioning, attitude control, and antenna pointing are briefly treated as part of the operations and control section. The last topic of this section concerns the operations required for efficiently providing the TDRSS user telecommunication services. The discussion treats functions of the GSFC control and data processing facility, ground station, and TDRS control center. The second major portion of this volume deals with the Telecommunication Service System (TSS) which consists of the ground station, TDRS communication equipment and the user transceiver. A summary of the requirements and objectives for the telecommunication services and a brief summary of the TSS capabilities is followed by communication system analysis, signal design, and equipment design. Finally, descriptions of the three TSS elements are presented.

  16. Drainage facility management system : final report, June 2009.

    DOT National Transportation Integrated Search

    2009-06-01

    This research project identified requirements for a drainage facility management system for the Oregon Department of Transportation. It also estimated the personnel resources needed to collect the inventory to populate such a system with data. A tota...

  17. Design of a video teleconference facility for a synchronous satellite communications link

    NASA Technical Reports Server (NTRS)

    Richardson, M. D.

    1979-01-01

    The system requirements, design tradeoffs, and final design of a video teleconference facility are discussed, including proper lighting, graphics transmission, and picture aesthetics. Methods currently accepted in the television broadcast industry are used in the design. The unique problems associated with using an audio channel with a synchronous satellite communications link are discussed, and a final audio system design is presented.

  18. Director, Operational Test and Evaluation

    DTIC Science & Technology

    2007-12-01

    important, and all – collectively – are necessary to properly set requirements, incentivize industry, oversee system design and development, and finally...evaluation planning which defines testing required for all system-level evaluation. • Enable access to all system-level test data by government DT...responsible for sustainment cost estimates, and with the OTAs, to contribute relevant data. As with all new missions, there is a question of resources

  19. Medicare program; End-Stage Renal Disease prospective payment system, quality incentive program, and Durable Medical Equipment, Prosthetics, Orthotics, and Supplies. Final rule.

    PubMed

    2014-11-06

    This final rule will update and make revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2015. This rule also finalizes requirements for the ESRD quality incentive program (QIP), including for payment years (PYs) 2017 and 2018. This rule will also make a technical correction to remove outdated terms and definitions. In addition, this final rule sets forth the methodology for adjusting Durable Medical Equipment, Prosthetics, Orthotics, and Supplies (DMEPOS) fee schedule payment amounts using information from the Medicare DMEPOS Competitive Bidding Program (CBP); makes alternative payment rules for certain DME under the Medicare DMEPOS CBP; clarifies the statutory Medicare hearing aid coverage exclusion and specifies devices not subject to the hearing aid exclusion; will not update the definition of minimal self-adjustment; clarifies the Change of Ownership (CHOW) and provides for an exception to the current requirements; revises the appeal provisions for termination of a CBP contract, including the beneficiary notification requirement under the Medicare DMEPOS CBP, and makes a technical change to the regulation related to the conditions for awarding contracts for furnishing infusion drugs under the Medicare DMEPOS CBP.

  20. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 2: Test Bed Performance Evaluation and Final AeroMACS Recommendations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Magner, James

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II (this document) describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  1. Design definition of the Laser Atmospheric Wind Sounder (LAWS), phase 2. Volume 2: Final report

    NASA Technical Reports Server (NTRS)

    Wilson, D. J.

    1992-01-01

    Lockheed personnel, along with team member subcontractors and consultants, have performed a preliminary design for the LAWS Instrument. Breadboarding and testing of a LAWS class laser have also been performed. These efforts have demonstrated that LAWS is a feasible Instrument and can be developed with existing state-of-the-art technology. Only a commitment to fund the instrument development and deployment is required to place LAWS in orbit and obtain the anticipated science and operational forecasting benefits. The LAWS Science Team was selected in 1988-89 as were the competing LAWS phase 1/2 contractor teams. The LAWS Science Team developed requirements for the LAWS Instrument, and the NASA/LAWS project office defined launch vehicle and platform design constraints. From these requirements and constraints, the lockheed team developed LAWS Instrument concepts and configurations. A system designed to meet these requirements and constraints is outlined. The LAWS primary subsystem and interfaces - laser, optical, and receiver/processor - required to assemble a lidar are identified. Also identified are the support subsystems required for the lidar to function from space: structures and mechanical, thermal, electrical, and command and data management. The Lockheed team has developed a preliminary design of a LAWS Instrument System consisting of these subsystems and interfaces which will meet the requirements and objectives of the Science Team. This final report provides a summary of the systems engineering analyses and trades of the LAWS. Summaries of the configuration, preliminary designs of the subsystems, testing recommendations, and performance analysis are presented. Environmental considerations associated with deployment of LAWS are discussed. Finally, the successful LAWS laser breadboard effort is discussed along with the requirements and test results.

  2. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2017; Medicare Advantage Bid Pricing Data Release; Medicare Advantage and Part D Medical Loss Ratio Data Release; Medicare Advantage Provider Network Requirements; Expansion of Medicare Diabetes Prevention Program Model; Medicare Shared Savings Program Requirements. Final rule.

    PubMed

    2016-11-15

    This major final rule addresses changes to the physician fee schedule and other Medicare Part B payment policies, such as changes to the Value Modifier, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. This final rule also includes changes related to the Medicare Shared Savings Program, requirements for Medicare Advantage Provider Networks, and provides for the release of certain pricing data from Medicare Advantage bids and of data from medical loss ratio reports submitted by Medicare health and drug plans. In addition, this final rule expands the Medicare Diabetes Prevention Program model.

  3. State of Texas ITS architectures and deployment plans : San Angelo region, executive summary

    DOT National Transportation Integrated Search

    2004-11-12

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  4. State of Texas ITS architectures and deployment plans : Brazos Valley region, executive summary

    DOT National Transportation Integrated Search

    2004-04-30

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  5. State of Texas ITS architectures and deployment plans : Corpus Christi region, executive summary

    DOT National Transportation Integrated Search

    2003-04-28

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  6. State of Texas ITS architectures and deployment plans : Tyler region, executive summary

    DOT National Transportation Integrated Search

    2003-07-16

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  7. State of Texas ITS architectures and deployment plans : Atlanta region, executive summary

    DOT National Transportation Integrated Search

    2003-11-07

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  8. State of Texas ITS architectures and deployment plans : Beaumont Region, executive summary

    DOT National Transportation Integrated Search

    2003-12-29

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  9. State of Texas ITS architectures and deployment plans : Lubbock region, executive summary

    DOT National Transportation Integrated Search

    2005-02-28

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  10. State of Texas ITS architectures and deployment plans : Paris region, executive summary

    DOT National Transportation Integrated Search

    2005-05-31

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  11. State of Texas ITS architectures and deployment plans : Childress region, executive summary

    DOT National Transportation Integrated Search

    2003-08-22

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  12. State of Texas ITS architectures and deployment plans : Del Rio region, executive summary

    DOT National Transportation Integrated Search

    2004-02-27

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  13. State of Texas ITS architectures and deployment plans : Laredo region, executive summary

    DOT National Transportation Integrated Search

    2003-06-20

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  14. State of Texas ITS architectures and deployment plans : Wichita Falls region, executive summary

    DOT National Transportation Integrated Search

    2005-01-14

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  15. 75 FR 49947 - Notice of Lodging of Proposed Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... Decree, Premix is required to operate an emission control system (``ECS'') that meets and exceeds... based upon the demonstrated performance of the ECS. Finally, the proposed settlement will also require...

  16. Revisions to labeling requirements for blood and blood components, including source plasma. Final rule.

    PubMed

    2012-01-03

    The Food and Drug Administration (FDA) is revising the labeling requirements for blood and blood components intended for use in transfusion or for further manufacture by combining, simplifying, and updating specific regulations applicable to labeling and circulars of information. These requirements will facilitate the use of a labeling system using machine-readable information that would be acceptable as a replacement for the ``ABC Codabar'' system for the labeling of blood and blood components. FDA is taking this action as a part of its efforts to comprehensively review and, as necessary, revise its regulations, policies, guidances, and procedures related to the regulation of blood and blood components. This final rule is intended to help ensure the continued safety of the blood supply and facilitate consistency in labeling.

  17. Satellite Power Systems (SPS) concept definition study, exhibit C. Volume 7: System/subsystem requirements data book

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1979-01-01

    Volume 7 of the Satellite Power Systems (SPS) Concept Definition Study final report summarizes the basic requirements used as a guide to systems analysis and is a basis for the selection of candidate SPS point design(s). Initially, these collected data reflected the level of definition resulting from the evaluation of a broad spectrum of SPS concepts. As the various concepts matured these requirements were updated to reflect the requirements identified for the projected satellite system/subsystem point design(s). The identified subsystem/systems requirements are defined, and where appropriate, recommendations for alternate approaches which may represent improved design features are presented. A more detailed discussion of the selected point design(s) will be found in Volume 2 of this report.

  18. 75 FR 70371 - Medicare Program; Home Health Prospective Payment System Rate Update for Calendar Year 2011...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This final rule sets forth an update to the Home Health Prospective Payment System (HH PPS) rates, including: the national standardized 60-day episode rates, the national per-visit rates, the nonroutine medical supply (NRS) conversion factors, and the low utilization payment amount (LUPA) add-on payment amounts, under the Medicare prospective payment system for HHAs effective January 1, 2011. This rule also updates the wage index used under the HH PPS and, in accordance with the Patient Protection and Affordable Care Act of 2010 (Affordable Care Act), updates the HH PPS outlier policy. In addition, this rule revises the home health agency (HHA) capitalization requirements. This rule further adds clarifying language to the ``skilled services'' section. The rule finalizes a 3.79 percent reduction to rates for CY 2011 to account for changes in case-mix, which are unrelated to real changes in patient acuity. Finally, this rule incorporates new legislative requirements regarding face-to-face encounters with providers related to home health and hospice care.

  19. Lessons Learned in the Specification, Purchase, Validation and Final Installation Process of a Replacement PCM Bit Synchronizer

    NASA Technical Reports Server (NTRS)

    Price, Richard N.

    2007-01-01

    This paper intends to describe the lessons learned while specifying validating and installing a bit sync to replace the 30 year old Aydin Model 335a PCM bit sync used in the Space Shuttle Launch Control Center. The engineer had to analyze the original requirements and specifications and then create new requirements documentation that more correctly described our needs. One issue to consider was the removal of unnecessary requirements such as various data formats when only one format is used. The conversion to a system that no longer has an assortment of analog rotary switches required retraining of the operators. Finally, post-procurement corrections for undisclosed user requirements and missed design requirements required close contact with a manufacturer who was willing to accommodate the changes.

  20. On a Mathematical Theory of Coded Exposure

    DTIC Science & Technology

    2014-08-01

    formulae that give the MSE and SNR of the final crisp image 1. Assumes the Shannon-Whittaker framework that i) requires band limited (with a fre...represents the ideal crisp image, i.e., the image that one would observed if there were no noise whatsoever, no motion, with a perfect optical system...discrete. In addition, the image obtained by a coded exposure camera requires to undergo a deconvolution to get the final crisp image. Note that the

  1. Integrating MBSE into Ongoing Projects: Requirements Validation and Test Planning for the ISS SAFER

    NASA Technical Reports Server (NTRS)

    Anderson, Herbert A.; Williams, Antony; Pierce, Gregory

    2016-01-01

    The International Space Station (ISS) Simplified Aid for Extra Vehicular Activity (EVA) Rescue (SAFER) is the spacewalking astronaut's final safety measure against separating from the ISS and being unable to return safely. Since the late 1990s, the SAFER has been a standard element of the spacewalking astronaut's equipment. The ISS SAFER project was chartered to develop a new block of SAFER units using a highly similar design to the legacy SAFER (known as the USA SAFER). An on-orbit test module was also included in the project to enable periodic maintenance/propulsion system checkout on the ISS SAFER. On the ISS SAFER project, model-based systems engineering (MBSE) was not the initial systems engineering (SE) approach, given the volume of heritage systems engineering and integration (SE&I) products. The initial emphasis was ensuring traceability to ISS program standards as well as to legacy USA SAFER requirements. The requirements management capabilities of the Cradle systems engineering tool were to be utilized to that end. During development, however, MBSE approaches were applied selectively to address specific challenges in requirements validation and test and verification (T&V) planning, which provided measurable efficiencies to the project. From an MBSE perspective, ISS SAFER development presented a challenge and an opportunity. Addressing the challenge first, the project was tasked to use the original USA SAFER operational and design requirements baseline, with a number of additional ISS program requirements to address evolving certification expectations for systems operating on the ISS. Additionally, a need to redesign the ISS SAFER avionics architecture resulted in a set of changes to the design requirements baseline. Finally, the project added an entirely new functionality for on-orbit maintenance. After initial requirements integration, the system requirements count was approaching 1000, which represented a growth of 4x over the original USA SAFER system. This presented the challenge - How to confirm that this new set of requirements set would result in the creation of the desired capability.

  2. State of Texas ITS architectures and deployment plans : Lower Rio Grande Valley region, executive summary

    DOT National Transportation Integrated Search

    2003-07-23

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  3. 77 FR 35953 - Arts in Education National Program; Final Priority, Requirements, Definitions, and Selection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... diversified approaches to teaching and learning through the arts. Discussion: The funds available for this..., educational programming, and supporting systemic school reform. Final Selection Criteria: The Assistant Deputy... cumulative regulations; (3) In choosing among alternative regulatory approaches, select those approaches that...

  4. State of Texas ITS architectures and deployment plans : West Central Texas region, executive summary

    DOT National Transportation Integrated Search

    2004-09-17

    The Federal Highway Administration (FHWA) issued a final rule to implement Section 5206(e) of the Transportation Equity Act for the 21st Century (TEA-21) in January of 2001. This final rule requires that Intelligent Transportation System (ITS) projec...

  5. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2012. Final rule.

    PubMed

    2011-08-08

    This final rule updates the payment rates used under the prospective payment system for skilled nursing facilities (SNFs) for fiscal year 2012. In addition, it recalibrates the case-mix indexes so that they more accurately reflect parity in expenditures between RUG-IV and the previous case-mix classification system. It also includes a discussion of a Non-Therapy Ancillary component currently under development within CMS. In addition, this final rule discusses the impact of certain provisions of the Affordable Care Act, and reduces the SNF market basket percentage by the multi-factor productivity adjustment. This rule also implements certain changes relating to the payment of group therapy services and implements new resident assessment policies. Finally, this rule announces that the proposed provisions regarding the ownership disclosure requirements set forth in section 6101 of the Affordable Care Act will be finalized at a later date.

  6. Experiences with a Requirements-Based Programming Approach to the Development of a NASA Autonomous Ground Control System

    NASA Technical Reports Server (NTRS)

    Hinchey, Michael G.; Rash, James L.; Rouff, Christopher A.; Gracanin, Denis; Erickson, John

    2005-01-01

    Requirements-to-Design-to-Code (R2D2C) is an approach to the engineering of computer-based systems that embodies the idea of requirements-based programming in system development. It goes further; however, in that the approach offers not only an underlying formalism, but full formal development from requirements capture through to the automatic generation of provably-correct code. As such, the approach has direct application to the development of systems requiring autonomic properties. We describe a prototype tool to support the method, and illustrate its applicability to the development of LOGOS, a NASA autonomous ground control system, which exhibits autonomic behavior. Finally, we briefly discuss other areas where the approach and prototype tool are being considered for application.

  7. Space shuttle EVA/IVA support equipment requirements study. Volume 1: Final summary report

    NASA Technical Reports Server (NTRS)

    1973-01-01

    A study was conducted to determine the support equipment requirements for space shuttle intravehicular and extravehicular activities. The subjects investigated are; (1) EVA/IVA task identification and analysis,. (2) primary life support system, (3) emergency life support system, (4) pressure suit assembly, (5) restraints, (6) work site provision, (7) emergency internal vehicular emergencies, and (8) vehicular interfaces.

  8. Reliability-Based Electronics Shielding Design Tools

    NASA Technical Reports Server (NTRS)

    Wilson, J. W.; O'Neill, P. J.; Zang, T. A.; Pandolf, J. E.; Tripathi, R. K.; Koontz, Steven L.; Boeder, P.; Reddell, B.; Pankop, C.

    2007-01-01

    Shielding design on large human-rated systems allows minimization of radiation impact on electronic systems. Shielding design tools require adequate methods for evaluation of design layouts, guiding qualification testing, and adequate follow-up on final design evaluation.

  9. Final report bridge design system analysis and modernization.

    DOT National Transportation Integrated Search

    2016-09-27

    The Bridge Design System (BDS) is an in-house software program developed by the Michigan Department of Transportations : (MDOT) Bridge Design Unit. The BDS designs bridges according to the required specifications, and outputs corresponding design ...

  10. Extruded Tunnel Lining System : Phase 1. Conceptual Design and Feasibility Testing.

    DOT National Transportation Integrated Search

    1979-09-01

    The Extruded Tunnel Lining System (ETLS) has been conceived as a means of continuously placing the final concrete tunnel lining directly behind a tunnel boring machine. The system will shorten the time required to excavate and line a tunnel section, ...

  11. Geostationary platform systems concepts definition study. Volume 2: Technical, book 3

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The supporting research and technology, and space demonstrations required to support the 1990s operational geostationary platforms are identified. Also the requirements on and interfaces with the Space Transportation System hardware elements supporting the geostationary platform program, including the shuttle, orbital transfer vehicles, teleoperator, etc., are investigated to provide integrated support requirements. Finally, a preliminary evaluation of the practicability and capabilities of an experimental platform from the standpoint of technology, schedule, and cost is given.

  12. Life sciences payload definition and integration study. Volume 2: Requirements, design, and planning studies for the carry-on laboratories. [for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.

  13. Space transfer vehicle concepts and requirements study. Volume 2, book 3: STV system interfaces

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    This report presents the results of systems analyses and conceptual design of space transfer vehicles (STV). The missions examined included piloted and unpiloted lunar outpost support and spacecraft servicing, and unpiloted payload delivery to various earth and solar orbits. The study goal was to examine the mission requirements and provide a decision data base for future programmatic development plans. The final lunar transfer vehicles provided a wide range of capabilities and interface requirements while maintaining a constant payload mission model. Launch vehicle and space station sensitivity was examined, with the final vehicles as point design covering the range of possible options. Development programs were defined and technology readiness levels for different options were determined. Volume 1 presents the executive summary, volume 2 provides the study results, and volume 3 the cost and WBS data.

  14. Final Report - Regulatory Considerations for Adaptive Systems

    NASA Technical Reports Server (NTRS)

    Wilkinson, Chris; Lynch, Jonathan; Bharadwaj, Raj

    2013-01-01

    This report documents the findings of a preliminary research study into new approaches to the software design assurance of adaptive systems. We suggest a methodology to overcome the software validation and verification difficulties posed by the underlying assumption of non-adaptive software in the requirementsbased- testing verification methods in RTCA/DO-178B and C. An analysis of the relevant RTCA/DO-178B and C objectives is presented showing the reasons for the difficulties that arise in showing satisfaction of the objectives and suggested additional means by which they could be satisfied. We suggest that the software design assurance problem for adaptive systems is principally one of developing correct and complete high level requirements and system level constraints that define the necessary system functional and safety properties to assure the safe use of adaptive systems. We show how analytical techniques such as model based design, mathematical modeling and formal or formal-like methods can be used to both validate the high level functional and safety requirements, establish necessary constraints and provide the verification evidence for the satisfaction of requirements and constraints that supplements conventional testing. Finally the report identifies the follow-on research topics needed to implement this methodology.

  15. Medicare and Medicaid programs; Home Health Prospective Payment System rate update for CY 2014, home health quality reporting requirements, and cost allocation of home health survey expenses. Final rule.

    PubMed

    2013-12-02

    This final rule will update the Home Health Prospective Payment System (HH PPS) rates, including the national, standardized 60-day episode payment rates, the national per-visit rates, the low-utilization payment adjustment (LUPA) add-on, and the non-routine medical supply (NRS) conversion factor under the Medicare prospective payment system for home health agencies (HHAs), effective January 1, 2014. As required by the Affordable Care Act, this rule establishes rebasing adjustments, with a 4-year phase-in, to the national, standardized 60-day episode payment rates; the national per-visit rates; and the NRS conversion factor. In addition, this final rule will remove 170 diagnosis codes from assignment to diagnosis groups within the HH PPS Grouper, effective January 1, 2014. Finally, this rule will establish home health quality reporting requirements for CY 2014 payment and subsequent years and will clarify that a state Medicaid program must provide that, in certifying HHAs, the state's designated survey agency carry out certain other responsibilities that already apply to surveys of nursing facilities and Intermediate Care Facilities for Individuals with Intellectual Disabilities (ICF-IID), including sharing in the cost of HHA surveys. For that portion of costs attributable to Medicare and Medicaid, we will assign 50 percent to Medicare and 50 percent to Medicaid, the standard method that CMS and states use in the allocation of expenses related to surveys of nursing homes.

  16. Crew/computer communications study. Volume 1: Final report. [onboard computerized communications system for spacecrews

    NASA Technical Reports Server (NTRS)

    Johannes, J. D.

    1974-01-01

    Techniques, methods, and system requirements are reported for an onboard computerized communications system that provides on-line computing capability during manned space exploration. Communications between man and computer take place by sequential execution of each discrete step of a procedure, by interactive progression through a tree-type structure to initiate tasks or by interactive optimization of a task requiring man to furnish a set of parameters. Effective communication between astronaut and computer utilizes structured vocabulary techniques and a word recognition system.

  17. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2016. Final rule.

    PubMed

    2015-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2016 as required by the statute. As required by section 1886(j)(5) of the Act, this rule includes the classification and weighting factors for the IRF PPS's case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2016. This final rule also finalizes policy changes, including the adoption of an IRF-specific market basket that reflects the cost structures of only IRF providers, a 1-year phase-in of the revised wage index changes, a 3-year phase-out of the rural adjustment for certain IRFs, and revisions and updates to the quality reporting program (QRP).

  18. FINAL MASTER PLAN FOR STELLA, MISSOURI

    EPA Science Inventory

    The application of sustainability to place is the outcome of responding to human needs and expectations within economic, social, and environmental constraints and desired performance of these systems. These constraints and performance requirements of these systems provides a way ...

  19. 75 FR 44655 - Registration of Mortgage Loan Originators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... requires an employee of a bank, savings association, credit union or Farm Credit System (FCS) institution... (collectively, Agency-regulated institutions) who acts as a residential mortgage loan originator to register... this registration. The final rule further provides that Agency- regulated institutions must: require...

  20. Fact Sheet: Final Rule Determining Widespread use of Onboard Refueling Vapor Recovery and Waiver of Stage Two Requirements

    EPA Pesticide Factsheets

    Read the May 2012 factsheet on the rule that waived the requirement that current and former ozone nonattainment areas classifiedSerious and above, implement Stage II vapor recovery systems on gasoline pumps.

  1. Rendezvous and Docking Strategy for Crewed Segment of the Asteroid Redirect Mission

    NASA Technical Reports Server (NTRS)

    Hinkel, Heather D.; Cryan, Scott P.; D'Souza, Christopher; Dannemiller, David P.; Brazzel, Jack P.; Condon, Gerald L.; Othon, William L.; Williams, Jacob

    2014-01-01

    This paper will describe the overall rendezvous, proximity operations and docking (RPOD) strategy in support of the Asteroid Redirect Crewed Mission (ARCM), as part of the Asteroid Redirect Mission (ARM). The focus of the paper is on the crewed mission phase of ARM, starting with the establishment of Orion in the Distant Retrograde Orbit (DRO) and ending with docking to the Asteroid Redirect Vechicle (ARV). The paper will detail the sequence of maneuvers required to execute the rendezvous and proximity operations mission phases along with the on-board navigation strategies, including the final approach phase. The trajectories to be considered will include target vehicles in a DRO. The paper will also discuss the sensor requirements for rendezvous and docking and the various trade studies associated with the final sensor selection. Building on the sensor requirements and trade studies, the paper will include a candidate sensor concept of operations, which will drive the selection of the sensor suite; concurrently, it will be driven by higher level requirements on the system, such as crew timeline constraints and vehicle consummables. This paper will address how many of the seemingly competing requirements will have to be addressed to create a complete system and system design. The objective is to determine a sensor suite and trajectories that enable Orion to successfully rendezvous and dock with a target vehicle in trans lunar space. Finally, the paper will report on the status of a NASA action to look for synergy within RPOD, across the crewed and robotic asteroid missions.

  2. Medicare program: changes to the hospital outpatient prospective payment system and CY 2008 payment rates, the ambulatory surgical center payment system and CY 2008 payment rates, the hospital inpatient prospective payment system and FY 2008 payment rates; and payments for graduate medical education for affiliated teaching hospitals in certain emergency situations Medicare and Medicaid programs: hospital conditions of participation; necessary provider designations of critical access hospitals. Interim and final rule with comment period.

    PubMed

    2007-11-27

    This final rule with comment period revises the Medicare hospital outpatient prospective payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system. We describe the changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2008. In addition, the rule sets forth the applicable relative payment weights and amounts for services furnished in ASCs, specific HCPCS codes to which the final policies of the ASC payment system apply, and other pertinent rate setting information for the CY 2008 ASC payment system. Furthermore, this final rule with comment period will make changes to the policies relating to the necessary provider designations of critical access hospitals and changes to several of the current conditions of participation requirements. The attached document also incorporates the changes to the FY 2008 hospital inpatient prospective payment system (IPPS) payment rates made as a result of the enactment of the TMA, Abstinence Education, and QI Programs Extension Act of 2007, Public Law 110-90. In addition, we are changing the provisions in our previously issued FY 2008 IPPS final rule and are establishing a new policy, retroactive to October 1, 2007, of not applying the documentation and coding adjustment to the FY 2008 hospital-specific rates for Medicare-dependent, small rural hospitals (MDHs) and sole community hospitals (SCHs). In the interim final rule with comment period in this document, we are modifying our regulations relating to graduate medical education (GME) payments made to teaching hospitals that have Medicare affiliation agreements for certain emergency situations.

  3. Strategic avionics technology definition studies. Subtask 3-1A: Electrical Actuation (ELA) systems

    NASA Technical Reports Server (NTRS)

    Lum, Ben T. F.; Pond, Charles; Dermott, William

    1993-01-01

    This interim report presents the preliminary results of an electrical actuation (ELA) system study (subtask TA3-1A) to support the NASA strategic avionics technology definition studies. The final report of this ELA study is scheduled for September 30, 1993. The topics are presented in viewgraph form and include the following ELA technology demonstration testing; ELA system baseline; power and energy requirements for shuttle effector systems; power efficiency and losses of ELA effector systems; and power and energy requirements for ELA power sources.

  4. Medicare program; inpatient rehabilitation facility prospective payment system for federal fiscal year 2014. Final rule.

    PubMed

    2013-08-06

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's "60 percent rule'' compliance calculation to determine "presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  5. 78 FR 62017 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-11

    ...The Office of the Comptroller of the Currency (OCC) and Board of Governors of the Federal Reserve System (Board), are adopting a final rule that revises their risk-based and leverage capital requirements for banking organizations. The final rule consolidates three separate notices of proposed rulemaking that the OCC, Board, and FDIC published in the Federal Register on August 30, 2012, with selected changes. The final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for banking organizations subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The final rule incorporates these new requirements into the agencies' prompt corrective action (PCA) framework. In addition, the final rule establishes limits on a banking organization's capital distributions and certain discretionary bonus payments if the banking organization does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. Further, the final rule amends the methodologies for determining risk-weighted assets for all banking organizations, and introduces disclosure requirements that would apply to top-tier banking organizations domiciled in the United States with $50 billion or more in total assets. The final rule also adopts changes to the agencies' regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The final rule also codifies the agencies' regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the OCC is amending the market risk capital rule (market risk rule) to apply to Federal savings associations, and the Board is amending the advanced approaches and market risk rules to apply to top-tier savings and loan holding companies domiciled in the United States, except for certain savings and loan holding companies that are substantially engaged in insurance underwriting or commercial activities, as described in this preamble.

  6. Medicaid program; Medicaid Management Information Systems; conditions of approval and reapproval and procedures for reduction of Federal financial participation--HCFA. Final rule.

    PubMed

    1985-07-30

    This final rule provides the additional requirements to the conditions and procedures for initial approval and reapproval of Medicaid Management Information Systems (MMIS) that were added by section 1903(r) of the Social Security Act (as amended by section 901 of the Mental Health Systems Act of 1980, Pub. L. 96-398). These provisions are intended to improve States' MMIS, ensure efficient system operations, and make the procedures for detection of fraud, waste, and abuse more effective. In addition, this final rule specifies the procedures we follow in reducing the level of Federal financial participation in State administrative expenditures if a State fails to meet the conditions for initial operation, initial approval, or reapproval of an MMIS.

  7. Medicare and Medicaid Programs; Emergency Preparedness Requirements for Medicare and Medicaid Participating Providers and Suppliers. Final rule.

    PubMed

    2016-09-16

    This final rule establishes national emergency preparedness requirements for Medicare- and Medicaid-participating providers and suppliers to plan adequately for both natural and man-made disasters, and coordinate with federal, state, tribal, regional, and local emergency preparedness systems. It will also assist providers and suppliers to adequately prepare to meet the needs of patients, residents, clients, and participants during disasters and emergency situations. Despite some variations, our regulations will provide consistent emergency preparedness requirements, enhance patient safety during emergencies for persons served by Medicare- and Medicaid-participating facilities, and establish a more coordinated and defined response to natural and man-made disasters.

  8. ICESat-2 laser technology development

    NASA Astrophysics Data System (ADS)

    Edwards, Ryan; Sawruk, Nick W.; Hovis, Floyd E.; Burns, Patrick; Wysocki, Theodore; Rudd, Joe; Walters, Brooke; Fakhoury, Elias; Prisciandaro, Vincent

    2013-09-01

    A number of ICESat-2 system requirements drove the technology evolution and the system architecture for the laser transmitter Fibertek has developed for the mission.. These requirements include the laser wall plug efficiency, laser reliability, high PRF (10kHz), short-pulse (<1.5ns), relatively narrow spectral line-width, and wave length tunability. In response to these requirements Fibertek developed a frequency-doubled, master oscillator/power amplifier (MOPA) laser that incorporates direct pumped diode pumped Nd:YVO4 as the gain media, Another guiding force in the system design has been extensive hardware life testing that Fibertek has completed. This ongoing hardware testing and development evolved the system from the original baseline brass board design to the more robust flight laser system. The final design meets or exceeds all NASA requirements and is scalable to support future mission requirements.

  9. Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

  10. Precise time technology for selected Air Force systems: Present status and future requirements

    NASA Technical Reports Server (NTRS)

    Yannoni, N. F.

    1981-01-01

    Precise time and time interval (PTTI) technology is becoming increasingly significant to Air Force operations as digital techniques find expanded utility in military missions. Timing has a key role in the function as well as in navigation. A survey of the PTTI needs of several Air Force systems is presented. Current technology supporting these needs was reviewed and new requirements are emphasized for systems as they transfer from initial development to final operational deployment.

  11. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  12. Southwest Electronic One-Stop Shopping (EOSS) : field operational test : final evaluation report

    DOT National Transportation Integrated Search

    1999-06-01

    This report presents an evaluation of the Southwest Electronic One-Stop Shopping System (EOSS) Operational Test. The system consisted of a PC-based software application that enabled interstate carriers to identify required commercial vehicle credenti...

  13. Culvert information management system : demonstration project, final report, August 2009.

    DOT National Transportation Integrated Search

    2009-08-01

    The overall objective of the research was to develop a pilot scale Culvert Information Management System (CIMS) that will : comply with both requirements stipulated by the Governmental Accounting Standards Board (GASB-34) and new federal : storm wate...

  14. Readiness of the ATLAS Trigger and Data Acquisition system for the first LHC beams

    NASA Astrophysics Data System (ADS)

    Vandelli, W.; Atlas Tdaq Collaboration

    2009-12-01

    The ATLAS Trigger and Data Acquisition (TDAQ) system is based on O(2k) processing nodes, interconnected by a multi-layer Gigabit network, and consists of a combination of custom electronics and commercial products. In its final configuration, O(20k) applications will provide the needed capabilities in terms of event selection, data flow, local storage and data monitoring. In preparation for the first LHC beams, many TDAQ sub-systems already reached the final configuration and roughly one third of the final processing power has been deployed. Therefore, the current system allows for a sensible evaluation of the performance and scaling properties. In this paper we introduce the ATLAS TDAQ system requirements and architecture and we discuss the status of software and hardware component. We moreover present the results of performance measurements validating the system design and providing a figure for the ATLAS data acquisition capabilities in the initial data taking period.

  15. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  16. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  17. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... compliance with all reporting requirements described in this paragraph. (i) Required information. All IFQ...

  18. NFIRAOS in 2015: engineering for future integration of complex subsystems

    NASA Astrophysics Data System (ADS)

    Atwood, Jenny; Andersen, David; Byrnes, Peter; Densmore, Adam; Fitzsimmons, Joeleff; Herriot, Glen; Hill, Alexis

    2016-07-01

    The Narrow Field InfraRed Adaptive Optics System (NFIRAOS) will be the first-light facility Adaptive Optics (AO) system for the Thirty Meter Telescope (TMT). NFIRAOS will be able to host three science instruments that can take advantage of this high performance system. NRC Herzberg is leading the design effort for this critical TMT subsystem. As part of the final design phase of NFIRAOS, we have identified multiple subsystems to be sub-contracted to Canadian industry. The scope of work for each subcontract is guided by the NFIRAOS Work Breakdown Structure (WBS) and is divided into two phases: the completion of the final design and the fabrication, assembly and delivery of the final product. Integration of the subsystems at NRC will require a detailed understanding of the interfaces between the subsystems, and this work has begun by defining the interface physical characteristics, stability, local coordinate systems, and alignment features. In order to maintain our stringent performance requirements, the interface parameters for each subsystem are captured in multiple performance budgets, which allow a bottom-up error estimate. In this paper we discuss our approach for defining the interfaces in a consistent manner and present an example error budget that is influenced by multiple subsystems.

  19. Advanced Transportation System Studies Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development Contract. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The purpose of the Advanced Transportation System Studies (ATSS) Technical Area 2 (TA-2) Heavy Lift Launch Vehicle Development contract was to provide advanced launch vehicle concept definition and analysis to assist NASA in the identification of future launch vehicle requirements. Contracted analysis activities included vehicle sizing and performance analysis, subsystem concept definition, propulsion subsystem definition (foreign and domestic), ground operations and facilities analysis, and life cycle cost estimation. This document is Volume 2 of the final report for the contract. It provides documentation of selected technical results from various TA-2 analysis activities, including a detailed narrative description of the SSTO concept assessment results, a user's guide for the associated SSTO sizing tools, an SSTO turnaround assessment report, an executive summary of the ground operations assessments performed during the first year of the contract, a configuration-independent vehicle health management system requirements report, a copy of all major TA-2 contract presentations, a copy of the FLO launch vehicle final report, and references to Pratt & Whitney's TA-2 sponsored final reports regarding the identification of Russian main propulsion technologies.

  20. Medicare program; inpatient psychiatric facilities prospective payment system--update for fiscal year beginning October 1, 2014 (FY 2015). Final rule.

    PubMed

    2014-08-06

    This final rule will update the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs). These changes will be applicable to IPF discharges occurring during the fiscal year (FY) beginning October 1, 2014 through September 30, 2015. This final rule will also address implementation of ICD-10-CM and ICD-10-PCS codes; finalize a new methodology for updating the cost of living adjustment (COLA), and finalize new quality measures and reporting requirements under the IPF quality reporting program.

  1. System Modeling of Lunar Oxygen Production: Mass and Power Requirements

    NASA Technical Reports Server (NTRS)

    Steffen, Christopher J.; Freeh, Joshua E.; Linne, Diane L.; Faykus, Eric W.; Gallo, Christopher A.; Green, Robert D.

    2007-01-01

    A systems analysis tool for estimating the mass and power requirements for a lunar oxygen production facility is introduced. The individual modeling components involve the chemical processing and cryogenic storage subsystems needed to process a beneficiated regolith stream into liquid oxygen via ilmenite reduction. The power can be supplied from one of six different fission reactor-converter systems. A baseline system analysis, capable of producing 15 metric tons of oxygen per annum, is presented. The influence of reactor-converter choice was seen to have a small but measurable impact on the system configuration and performance. Finally, the mission concept of operations can have a substantial impact upon individual component size and power requirements.

  2. Automated documentation generator for advanced protein crystal growth

    NASA Technical Reports Server (NTRS)

    Maddux, Gary A.; Provancha, Anna; Chattam, David

    1994-01-01

    To achieve an environment less dependent on the flow of paper, automated techniques of data storage and retrieval must be utilized. This software system, 'Automated Payload Experiment Tool,' seeks to provide a knowledge-based, hypertext environment for the development of NASA documentation. Once developed, the final system should be able to guide a Principal Investigator through the documentation process in a more timely and efficient manner, while supplying more accurate information to the NASA payload developer. The current system is designed for the development of the Science Requirements Document (SRD), the Experiment Requirements Document (ERD), the Project Plan, and the Safety Requirements Document.

  3. Final muon cooling for a muon collider

    NASA Astrophysics Data System (ADS)

    Acosta Castillo, John Gabriel

    To explore the new energy frontier, a new generation of particle accelerators is needed. Muon colliders are a promising alternative if muon cooling can be made to work. Muons are 200 times heavier than electrons, so they produce less synchrotron radiation, and they behave like point particles. However, they have a short lifetime of 2.2 mus and the beam is more difficult to cool than an electron beam. The Muon Accelerator Program (MAP) was created to develop concepts and technologies required by a muon collider. An important effort has been made in the program to design and optimize a muon beam cooling system. The goal is to achieve the small beam emittance required by a muon collider. This work explores a final ionization cooling system using magnetic quadrupole lattices with a low enough beta* region to cool the beam to the required limit with available low Z absorbers.

  4. MarFS-Requirements-Design-Configuration-Admin

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kettering, Brett Michael; Grider, Gary Alan

    This document will be organized into sections that are defined by the requirements for a file system that presents a near-POSIX (Portable Operating System Interface) interface to the user, but whose data is stored in whatever form is most efficient for the type of data being stored. After defining the requirement the design for meeting the requirement will be explained. Finally there will be sections on configuring and administering this file system. More and more, data dominates the computing world. There is a “sea” of data out there in many different formats that needs to be managed and used. “Mar”more » means “sea” in Spanish. Thus, this product is dubbed MarFS, a file system for a sea of data.« less

  5. Framework for Architecture Trade Study Using MBSE and Performance Simulation

    NASA Technical Reports Server (NTRS)

    Ryan, Jessica; Sarkani, Shahram; Mazzuchim, Thomas

    2012-01-01

    Increasing complexity in modern systems as well as cost and schedule constraints require a new paradigm of system engineering to fulfill stakeholder needs. Challenges facing efficient trade studies include poor tool interoperability, lack of simulation coordination (design parameters) and requirements flowdown. A recent trend toward Model Based System Engineering (MBSE) includes flexible architecture definition, program documentation, requirements traceability and system engineering reuse. As a new domain MBSE still lacks governing standards and commonly accepted frameworks. This paper proposes a framework for efficient architecture definition using MBSE in conjunction with Domain Specific simulation to evaluate trade studies. A general framework is provided followed with a specific example including a method for designing a trade study, defining candidate architectures, planning simulations to fulfill requirements and finally a weighted decision analysis to optimize system objectives.

  6. LSST Telescope and Optics Status

    NASA Astrophysics Data System (ADS)

    Krabbendam, Victor; Gressler, W. J.; Andrew, J. R.; Barr, J. D.; DeVries, J.; Hileman, E.; Liang, M.; Neill, D. R.; Sebag, J.; Wiecha, O.; LSST Collaboration

    2011-01-01

    The LSST Project continues to advance the design and development of an observatory system capable of capturing 20,000 deg2 of the sky in six wavebands over ten years. Optical fabrication of the unique M1/M3 monolithic mirror has entered final front surface optical processing. After substantial grinding to remove 5 tons of excess glass above the M3 surface, a residual of a single spin casting, both distinct optical surfaces are now clearly evident. Loose abrasive grinding has begun and polishing is to occur during 2011 and final optical testing is planned in early 2012. The M1/M3 telescope cell and internal component designs have matured to support on telescope operational requirements and off telescope coating needs. The mirror position system (hardpoint actuators) and mirror support system (figure actuator) designs have developed through internal laboratory analysis and testing. Review of thermal requirements has assisted with definition of a thermal conditioning and control system. Pre-cooling the M1/M3 substrate will enable productive observing during the large temperature swing often seen at twilight. The M2 ULE™ substrate is complete and lies in storage waiting for additional funding to enable final optical polishing. This 3.5m diameter, 100mm thick meniscus substrate has been ground to within 40 microns of final figure. Detailed design of the telescope mount, including subflooring, has been developed. Finally, substantial progress has been achieved on the facility design. In early 2010, LSST contracted with ARCADIS Geotecnica Consultores, a Santiago based engineering firm to lead the formal architectural design effort for the summit facility.

  7. 76 FR 72087 - Special Conditions: Diamond Aircraft Industries, Model DA-40NG; Electronic Engine Control (EEC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... engine design certification, and the certification requirements for engine control systems are driven by... following novel or unusual design features: Electronic engine control system. Discussion As discussed above...; Electronic Engine Control (EEC) System AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final...

  8. 78 FR 9623 - Federal Motor Vehicle Safety Standards; Air Brake Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... [Docket No. NHTSA-2013-0011] RIN 2127-AL11 Federal Motor Vehicle Safety Standards; Air Brake Systems... rule that amended the Federal motor vehicle safety standard for air brake systems by requiring... published a final rule in the Federal Register amending Federal Motor Vehicle Safety Standard (FMVSS) No...

  9. Options for enhancing the effectiveness of Virginia's safety management system : final report.

    DOT National Transportation Integrated Search

    1996-02-01

    In 1993, Virginia began to formalize the relationships and organizational structure for its Safety Management System (SMS). Although the SMS is no longer a federal requirement, Virginia decided to continue its implementation. The Focal Point for the ...

  10. 48 CFR 2033.204 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy. 2033.204 Section 2033.204 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 2033.204 Policy. Final decisions of the NRC...

  11. 48 CFR 2033.204 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Policy. 2033.204 Section 2033.204 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 2033.204 Policy. Final decisions of the NRC...

  12. 48 CFR 2033.204 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy. 2033.204 Section 2033.204 Federal Acquisition Regulations System NUCLEAR REGULATORY COMMISSION GENERAL CONTRACTING REQUIREMENTS PROTESTS, DISPUTES, AND APPEALS Disputes and Appeals 2033.204 Policy. Final decisions of the NRC...

  13. Statewide intelligent transportation systems earmark evaluation. Part B, final report

    DOT National Transportation Integrated Search

    2003-11-01

    As a recipient of Intelligent Transportation System (ITS) Integration Program funds, the Wisconsin Department of Transportation is required to perform a self-evaluation on each program supported by the funds. The report includes the results of that e...

  14. Development of vendor evaluation criteria and post-implementation considerations for MSFC center-wide executive information system

    NASA Technical Reports Server (NTRS)

    Moynihan, Gary P.

    1992-01-01

    In June 1991, the MITRE Corporation submitted a series of recommendations as part of a Marshall Space Flight Center (MSFC) Management Information System Requirements Study, initiated by the Information Systems Office (ISO). A major recommendation of the study was to develop an Executive Information System (EIS) for MSFC executives. ISO was directed, by center management, to proceed with the development of a Center-Wide Executive Information System. Existing EIS prototypes, developed by the Space Shuttle Projects Office and the Payload Projects Office, were reviewed. These existing MSFC prototypes were considered not to encompass the required functionality needed on a center-wide basis. A follow-up study by MITRE provided top-level system requirements. These were later incorporated into a final requirements specification document by Boeing Computer Support Services.

  15. Measure in the ESRD QIP for PY 2020. Final rule.

    PubMed

    2017-08-04

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2018. It also revises and rebases the market basket index by updating the base year from 2010 to 2014, and by adding a new cost category for Installation, Maintenance, and Repair Services. The rule also finalizes revisions to the SNF Quality Reporting Program (QRP), including measure and standardized resident assessment data policies and policies related to public display. In addition, it finalizes policies for the Skilled Nursing Facility Value-Based Purchasing Program that will affect Medicare payment to SNFs beginning in FY 2019. The final rule also clarifies the regulatory requirements for team composition for surveys conducted for investigating a complaint and aligns regulatory provisions for investigation of complaints with the statutory requirements. The final rule also finalizes the performance period for the National Healthcare Safety Network (NHSN) Healthcare Personnel (HCP) Influenza Vaccination Reporting Measure included in the End-Stage Renal Disease (ESRD) Quality Incentive Program (QIP) for Payment Year 2020.

  16. Mold heating and cooling microprocessor conversion. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, D.P.

    Conversion of the microprocessors and software for the Mold Heating and Cooling (MHAC) pump package control systems was initiated to allow required system enhancements and provide data communications capabilities with the Plastics Information and Control System (PICS). The existing microprocessor-based control systems for the pump packages use an Intel 8088-based microprocessor board with a maximum of 64 Kbytes of program memory. The requirements for the system conversion were developed, and hardware has been selected to allow maximum reuse of existing hardware and software while providing the required additional capabilities and capacity. The new hardware will incorporate an Intel 80286-based microprocessormore » board with an 80287 math coprocessor, the system includes additional memory, I/O, and RS232 communication ports.« less

  17. Air Force Global Weather Central System Architecture Study. Final System/Subsystem Summary Report. Volume 2. Requirements Compilation and Analysis. Part 1. User and Model Requirements

    DTIC Science & Technology

    1976-03-01

    Milestones will be established after staffing at 6WW. Long-Term Procedures: A capability will be acquired in automated support to Command and Control under... geocentric latitude f = ZttsinQ g = geopotential a = mean radius of earth Ü = angular rotation of the earth 7.29 x 10" rad/sec u,v

  18. Systems engineering and the user: Incorporation of user requirements into the SE process

    NASA Technical Reports Server (NTRS)

    Naugle, John E.

    1993-01-01

    This paper is organized into four parts. In the Gestation Phase, I describe the process of starting a new mission and establishing its rough boundaries. Next I show how the scientific experiments are selected. Then we enter the Preliminary Design Phase, where we incorporate the scientist's instruments into the systems engineering process. Finally, I show how the Preliminary Design Review (PDR) assures NASA management and the scientists that the scientific requirements have been incorporated into the systems engineering process to everyone's satisfaction.

  19. Survey on multisensory feedback virtual reality dental training systems.

    PubMed

    Wang, D; Li, T; Zhang, Y; Hou, J

    2016-11-01

    Compared with traditional dental training methods, virtual reality training systems integrated with multisensory feedback possess potentials advantages. However, there exist many technical challenges in developing a satisfactory simulator. In this manuscript, we systematically survey several current dental training systems to identify the gaps between the capabilities of these systems and the clinical training requirements. After briefly summarising the components, functions and unique features of each system, we discuss the technical challenges behind these systems including the software, hardware and user evaluation methods. Finally, the clinical requirements of an ideal dental training system are proposed. Future research/development areas are identified based on an analysis of the gaps between current systems and clinical training requirements. © 2015 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  20. Liquid Rocket Booster (LRB) for the Space Transportation System (STS) systems study, volume 2

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Liquid Rocket Booster (LRB) Systems Definition Handbook presents the analyses and design data developed during the study. The Systems Definition Handbook (SDH) contains three major parts: the LRB vehicles definition; the Pressure-Fed Booster Test Bed (PFBTB) study results; and the ALS/LRB study results. Included in this volume are the results of all trade studies; final configurations with supporting rationale and analyses; technology assessments; long lead requirements for facilities, materials, components, and subsystems; operational requirements and scenarios; and safety, reliability, and environmental analyses.

  1. Study of Alternate Space Shuttle Concepts. Volume 2. Part 1: Concept Analysis and Definition

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Three different space shuttle systems have been defined and analyzed. The first is a stage-and-one-half system optimized to meet program requirements. The second is a two-stage, fully reusable system also designed to meet program requirements. The third is a convertible system which operates initially as a stage-and-one-half system and is subsequently converted to a two-stage, fully reusable system by reconfiguration of the orbiter vehicle and development of a booster vehicle. The design and performance of this third system must necessarily be compromised somewhat to facilitate the conversion. For each system, the applicable requirements, ground rules, and assumptions are defined. The characteristics of each system are listed and a detailed description and analysis of the system are presented. Finally, a cost analysis for the system is given.

  2. Cost effective solar hot water system for Econo-Travel Motor Hotel located at Richmond, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-09-01

    The final report is presented of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 5408 Williamsburg Road, Richmond, Virginia. The description of the system is given along with the final cost breakdown, expected performance data and expected payback time for the installed system is estimated to be approximately five (5) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryersmore » used for the laundry. The success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less

  3. Cost effective solar hot water system for Econo-Travel Motor Hotel located at Bluefield, West Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-07-01

    The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 3400 Cumberland Road, Bluefield, West Virginia. The description of the system along with the final breakdown performance data and payback time are given. The payback time for the installed system will be approximately five (5) years instead of the 7.73 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers used for themore » laundry. The success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less

  4. Final design and fabrication of an active control system for flutter suppression on a supercritical aeroelastic research wing

    NASA Technical Reports Server (NTRS)

    Hodges, G. E.; Mcgehee, C. R.

    1981-01-01

    The final design and hardware fabrication was completed for an active control system capable of the required flutter suppression, compatible with and ready for installation in the NASA aeroelastic research wing number 1 (ARW-1) on Firebee II drone flight test vehicle. The flutter suppression system uses vertical acceleration at win buttock line 1.930 (76), with fuselage vertical and roll accelerations subtracted out, to drive wing outboard aileron control surfaces through appropriate symmetric and antisymmetric shaping filters. The goal of providing an increase of 20 percent above the unaugmented vehicle flutter velocity but below the maximum operating condition at Mach 0.98 is exceeded by the final flutter suppression system. Results indicate that the flutter suppression system mechanical and electronic components are ready for installation on the DAST ARW-1 wing and BQM-34E/F drone fuselage.

  5. C-Band Airport Surface Communications System Standards Development. Phase II Final Report. Volume 1: Concepts of Use, Initial System Requirements, Architecture, and AeroMACS Design Considerations

    NASA Technical Reports Server (NTRS)

    Hall, Edward; Isaacs, James; Henriksen, Steve; Zelkin, Natalie

    2011-01-01

    This report is provided as part of ITT s NASA Glenn Research Center Aerospace Communication Systems Technical Support (ACSTS) contract NNC05CA85C, Task 7: New ATM Requirements-Future Communications, C-Band and L-Band Communications Standard Development and was based on direction provided by FAA project-level agreements for New ATM Requirements-Future Communications. Task 7 included two subtasks. Subtask 7-1 addressed C-band (5091- to 5150-MHz) airport surface data communications standards development, systems engineering, test bed and prototype development, and tests and demonstrations to establish operational capability for the Aeronautical Mobile Airport Communications System (AeroMACS). Subtask 7-2 focused on systems engineering and development support of the L-band digital aeronautical communications system (L-DACS). Subtask 7-1 consisted of two phases. Phase I included development of AeroMACS concepts of use, requirements, architecture, and initial high-level safety risk assessment. Phase II builds on Phase I results and is presented in two volumes. Volume I (this document) is devoted to concepts of use, system requirements, and architecture, including AeroMACS design considerations. Volume II describes an AeroMACS prototype evaluation and presents final AeroMACS recommendations. This report also describes airport categorization and channelization methodologies. The purposes of the airport categorization task were (1) to facilitate initial AeroMACS architecture designs and enable budgetary projections by creating a set of airport categories based on common airport characteristics and design objectives, and (2) to offer high-level guidance to potential AeroMACS technology and policy development sponsors and service providers. A channelization plan methodology was developed because a common global methodology is needed to assure seamless interoperability among diverse AeroMACS services potentially supplied by multiple service providers.

  6. Prior notice of imported food under the Public Health Security and Bioterrorism Preparedness and Response Act of 2002. Final rule.

    PubMed

    2008-11-07

    The Food and Drug Administration (FDA) is issuing a final regulation that requires the submission to FDA of prior notice of food, including animal feed, that is imported or offered for import into the United States. The final rule implements the Public Health Security and Bioterrorism Preparedness and Response Act of 2002 (the Bioterrorism Act), which required prior notification of imported food to begin on December 12, 2003. The final rule requires that the prior notice be submitted to FDA electronically via either the U.S. Customs and Border Protection (CBP or Customs) Automated Broker Interface (ABI) of the Automated Commercial System (ACS) or the FDA Prior Notice System Interface (FDA PNSI). The information must be submitted and confirmed electronically as facially complete by FDA for review no less than 8 hours (for food arriving by water), 4 hours (for food arriving by air or land/rail), and 2 hours (for food arriving by land/road) before the food arrives at the port of arrival. Food imported or offered for import without adequate prior notice is subject to refusal and, if refused, must be held. Elsewhere in this issue of the Federal Register, FDA is announcing the availability of a draft compliance policy guide (CPG) entitled "Sec. 110.310 Prior Notice of Imported Food Under the Public Health Security and Bioterrorism Preparedness and Response Act of 2002."

  7. Research on Computer Aided Innovation Model of Weapon Equipment Requirement Demonstration

    NASA Astrophysics Data System (ADS)

    Li, Yong; Guo, Qisheng; Wang, Rui; Li, Liang

    Firstly, in order to overcome the shortcoming of using only AD or TRIZ solely, and solve the problems currently existed in weapon equipment requirement demonstration, the paper construct the method system of weapon equipment requirement demonstration combining QFD, AD, TRIZ, FA. Then, we construct a CAI model frame of weapon equipment requirement demonstration, which include requirement decomposed model, requirement mapping model and requirement plan optimization model. Finally, we construct the computer aided innovation model of weapon equipment requirement demonstration, and developed CAI software of equipment requirement demonstration.

  8. Accelerated vehicle-to-infrastructure (V2I) safety applications : system requirements document : final.

    DOT National Transportation Integrated Search

    2001-05-01

    The purpose of this working paper is to provide an estimate of the federal proportion of funds expended on intelligent transportation systems (ITS) infrastructure deployments for fiscal year (FY) 2000 using budget and planning data from state departm...

  9. 75 FR 71799 - Medicare Program: Hospital Outpatient Prospective Payment System and CY 2011 Payment Rates...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ...The final rule with comment period in this document revises the Medicare hospital outpatient prospective payment system (OPPS) to implement applicable statutory requirements and changes arising from our continuing experience with this system and to implement certain provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (Affordable Care Act). In this final rule with comment period, we describe the changes to the amounts and factors used to determine the payment rates for Medicare hospital outpatient services paid under the prospective payment system. These changes are applicable to services furnished on or after January 1, 2011. In addition, this final rule with comment period updates the revised Medicare ambulatory surgical center (ASC) payment system to implement applicable statutory requirements and changes arising from our continuing experience with this system and to implement certain provisions of the Affordable Care Act. In this final rule with comment period, we set forth the applicable relative payment weights and amounts for services furnished in ASCs, specific HCPCS codes to which these changes apply, and other pertinent ratesetting information for the CY 2011 ASC payment system. These changes are applicable to services furnished on or after January 1, 2011. In this document, we also are including two final rules that implement provisions of the Affordable Care Act relating to payments to hospitals for direct graduate medical education (GME) and indirect medical education (IME) costs; and new limitations on certain physician referrals to hospitals in which they have an ownership or investment interest. In the interim final rule with comment period that is included in this document, we are changing the effective date for otherwise eligible hospitals and critical access hospitals that have been reclassified from urban to rural under section 1886(d)(8)(E) of the Social Security Act and 42 CFR 412.103 to receive reasonable cost payments for anesthesia services and related care furnished by nonphysician anesthetists from cost reporting periods beginning on or after October 1, 2010, to December 2, 2010.

  10. Health Care Financing Administration--Medicaid program; Medicaid management information systems. Final rule.

    PubMed

    1980-03-05

    These regulations set forth a new procedure to improve Medicaid management by explicitly authorizing HCFA to expand or revise State Medicaid Management Information Systems (MMIS) as necessary to meet program needs. Under this procedure, HCFA will publish major new requirements for comment before deciding to adopt them, and will provide increased Federal matching and reasonable phase-in time for their implementation. HCFA will also periodically review ongoing systems to determine whether all system requirements and performance standards are being met and may reduce the level of Federal matching for those MMIS systems which do not meet prescribed standards.

  11. AFC-Enabled Vertical Tail System Integration Study

    NASA Technical Reports Server (NTRS)

    Mooney, Helen P.; Brandt, John B.; Lacy, Douglas S.; Whalen, Edward A.

    2014-01-01

    This document serves as the final report for the SMAAART AFC-Enabled Vertical Tail System Integration Study. Included are the ground rule assumptions which have gone into the study, layouts of the baseline and AFC-enabled configurations, critical sizing information, system requirements and architectures, and assumed system properties that result in an NPV assessment of the two candidate AFC technologies.

  12. New York State Educational Information System (NYSEIS) Systems Design. Volume I, Phase II. Final Report.

    ERIC Educational Resources Information Center

    Price Waterhouse and Co., New York, NY.

    This volume on Phase II of the New York State Educational Information System (NYSEIS) describes the Gross Systems Analysis and Design, which includes the general flow diagram and processing chart for each of the student, personnel, and financial subsystems. Volume II, Functional Specifications, includes input/output requirements and file…

  13. On data modeling for neurological application

    NASA Astrophysics Data System (ADS)

    Woźniak, Karol; Mulawka, Jan

    The aim of this paper is to design and implement information system containing large database dedicated to support neurological-psychiatric examinations focused on human brain after stroke. This approach encompasses the following steps: analysis of software requirements, presentation of the problem solving concept, design and implementation of the final information system. Certain experiments were performed in order to verify the correctness of the project ideas. The approach can be considered as an interdisciplinary venture. Elaboration of the system architecture, data model and the tools supporting medical examinations are provided. The achievement of the design goals is demonstrated in the final conclusion.

  14. Research on Capturing of Customer Requirements Based on Innovation Theory

    NASA Astrophysics Data System (ADS)

    junwu, Ding; dongtao, Yang; zhenqiang, Bao

    To exactly and effectively capture customer requirements information, a new customer requirements capturing modeling method was proposed. Based on the analysis of function requirement models of previous products and the application of technology system evolution laws of the Theory of Innovative Problem Solving (TRIZ), the customer requirements could be evolved from existing product designs, through modifying the functional requirement unit and confirming the direction of evolution design. Finally, a case study was provided to illustrate the feasibility of the proposed approach.

  15. SafeConnect Solar - Final Scientific/Technical Report (Updated)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McNish, Zachary

    2016-02-03

    Final Scientific/Technical Report from Tier 0 SunShot Incubator award for hardware-based solution to reducing soft costs of installed solar. The primary objective of this project was for SafeConnect Solar (“SafeConnect”) to create working proof-of-concept hardware prototypes from its proprietary intellectual property and business concepts for a plug-and-play, safety-oriented hardware solution for photovoltaic solar systems. Specifically, SafeConnect sought to build prototypes of its “SmartBox” and related cabling and connectors, as well as the firmware needed to run the hardware. This hardware is designed to ensure a residential PV system installed with it can address all safety concerns that currently form themore » basis of AHJ electrical permitting and licensing requirements, thereby reducing the amount of permitting and specialized labor required on a residential PV system, and also opening up new sales channels and customer acquisition opportunities.« less

  16. Configuration study for a 30 GHz monolithic receive array, volume 1

    NASA Technical Reports Server (NTRS)

    Nester, W. H.; Cleaveland, B.; Edward, B.; Gotkis, S.; Hesserbacker, G.; Loh, J.; Mitchell, B.

    1984-01-01

    Gregorian, Cassegrain, and single reflector systems were analyzed in configuration studies for communications satellite receive antennas. Parametric design and performance curves were generated. A preliminary design of each reflector/feed system was derived including radiating elements, beam-former network, beamsteering system, and MMIC module architecture. Performance estimates and component requirements were developed for each design. A recommended design was selected for both the scanning beam and the fixed beam case. Detailed design and performance analysis results are presented for the selected Cassegrain configurations. The final design point is characterized in detail and performance measures evaluated in terms of gain, sidelobe level, noise figure, carrier-to-interference ratio, prime power, and beamsteering. The effects of mutual coupling and excitation errors (including phase and amplitude quantization errors) are evaluated. Mechanical assembly drawings are given for the final design point. Thermal design requirements are addressed in the mechanical design.

  17. Access control and privacy in large distributed systems

    NASA Technical Reports Server (NTRS)

    Leiner, B. M.; Bishop, M.

    1986-01-01

    Large scale distributed systems consists of workstations, mainframe computers, supercomputers and other types of servers, all connected by a computer network. These systems are being used in a variety of applications including the support of collaborative scientific research. In such an environment, issues of access control and privacy arise. Access control is required for several reasons, including the protection of sensitive resources and cost control. Privacy is also required for similar reasons, including the protection of a researcher's proprietary results. A possible architecture for integrating available computer and communications security technologies into a system that meet these requirements is described. This architecture is meant as a starting point for discussion, rather that the final answer.

  18. Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities for FY 2017, SNF Value-Based Purchasing Program, SNF Quality Reporting Program, and SNF Payment Models Research. Final rule.

    PubMed

    2016-08-05

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2017. In addition, it specifies a potentially preventable readmission measure for the Skilled Nursing Facility Value-Based Purchasing Program (SNF VBP), and implements requirements for that program, including performance standards, a scoring methodology, and a review and correction process for performance information to be made public, aimed at implementing value-based purchasing for SNFs. Additionally, this final rule includes additional polices and measures in the Skilled Nursing Facility Quality Reporting Program (SNF QRP). This final rule also responds to comments on the SNF Payment Models Research (PMR) project.

  19. Development of cable drive systems for an automated assembly project

    NASA Technical Reports Server (NTRS)

    Monroe, Charles A., Jr.

    1990-01-01

    In a robotic assembly project, a method was needed to accurately position a robot and a structure which the robot was to assemble. The requirements for high precision and relatively long travel distances dictated the use of cable drive systems. The design of the mechanisms used in translating the robot and in rotating the assembly under construction is discussed. The design criteria are discussed, and the effect of particular requirements on the design is noted. Finally, the measured performance of the completed mechanism is compared with design requirements.

  20. 77 FR 20840 - Bogue Chitto National Wildlife Refuge, LA and MS; Final Comprehensive Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-06

    ... Refuge System Improvement Act of 1997, requires us to develop a CCP for each national wildlife refuge... of historical regimes, soil types and elevation, and the current hydrological system. Management... published under the authority of the National Wildlife Refuge System Improvement Act of 1997, Public Law 105...

  1. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

  2. 77 FR 72746 - Regulation of Fuels and Fuel Additives: Modifications to Renewable Fuel Standard and Diesel...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-06

    ...EPA published a direct final rule on October 9, 2012 to amend the definition of heating oil in 40 CFR 80.1401 in the Renewable Fuel Standard (``RFS'') program under section 211(o) of the Clean Air Act. The direct final rule also amended requirements under EPA's diesel sulfur program related to the sulfur content of locomotive and marine diesel fuel produced by transmix processors, and the fuel marker requirements for 500 ppm sulfur locomotive and marine (LM) diesel fuel to allow for solvent yellow 124 marker to transition out of the distribution system. Because EPA received adverse comments on the heating oil definition and transmix amendments, we are withdrawing those portions of the direct final rule. Because EPA did not receive adverse comments with respect to the yellow marker amendments, those amendments will become effective as indicated in the direct final rule.

  3. Formal analysis of imprecise system requirements with Event-B.

    PubMed

    Le, Hong Anh; Nakajima, Shin; Truong, Ninh Thuan

    2016-01-01

    Formal analysis of functional properties of system requirements needs precise descriptions. However, the stakeholders sometimes describe the system with ambiguous, vague or fuzzy terms, hence formal frameworks for modeling and verifying such requirements are desirable. The Fuzzy If-Then rules have been used for imprecise requirements representation, but verifying their functional properties still needs new methods. In this paper, we propose a refinement-based modeling approach for specification and verification of such requirements. First, we introduce a representation of imprecise requirements in the set theory. Then we make use of Event-B refinement providing a set of translation rules from Fuzzy If-Then rules to Event-B notations. After that, we show how to verify both safety and eventuality properties with RODIN/Event-B. Finally, we illustrate the proposed method on the example of Crane Controller.

  4. Prototype development and demonstration for response, emergency staging, communications, uniform management, and evacuation (R.E.S.C.U.M.E.) : R.E.S.C.U.M.E. final functional and performance requirements.

    DOT National Transportation Integrated Search

    2014-01-01

    This document provides the high-level functional and performance requirements for the Prototype Development and Demonstration of a R.E.S.C.U.M.E. system. The requirements included in this document are based upon those that can be found in previous R....

  5. High concentration biotherapeutic formulation and ultrafiltration: Part 1 pressure limits.

    PubMed

    Lutz, Herb; Arias, Joshua; Zou, Yu

    2017-01-01

    High therapeutic dosage requirements and the desire for ease of administration drive the trend to subcutaneous administration using delivery systems such as subcutaneous pumps and prefilled syringes. Because of dosage volume limits, prefilled syringe administration requires higher concentration liquid formulations, limited to about 30 cP or roughly 100-300 g L -1 for mAb's. Ultrafiltration (UF) processes are routinely used to formulate biological therapeutics. This article considers pressure constraints on the UF process that may limit its ability to achieve high final product concentrations. A system hardware analysis shows that the ultrafiltration cassette pressure drop is the major factor limiting UF systems. Additional system design recommendations are also provided. The design and performance of a new cassette with a lower feed channel flow resistance is described along with 3D modeling of feed channel pressure drop. The implications of variations in cassette flow channel resistance for scaling up and setting specifications are considered. A recommendation for a maximum pressure specification is provided. A review of viscosity data and theory shows that molecular engineering, temperature, and the use of viscosity modifying excipients including pH adjustment can be used to achieve higher concentrations. The combined use of a low pressure drop cassette with excipients further increased final concentrations by 35%. Guidance is provided on system operation to control hydraulics during final concentration. These recommendations should allow one to design and operate systems to routinely achieve the 30 cP target final viscosity capable of delivery using a pre-filled syringe. © 2016 American Institute of Chemical Engineers Biotechnol. Prog., 33:113-124, 2017. © 2016 American Institute of Chemical Engineers.

  6. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2015. Final rule.

    PubMed

    2014-08-05

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2015. In addition, it adopts the most recent Office of Management and Budget (OMB) statistical area delineations to identify a facility's urban or rural status for the purpose of determining which set of rate tables will apply to the facility, and to determine the SNF PPS wage index including a 1-year transition with a blended wage index for all providers for FY 2015. This final rule also contains a revision to policies related to the Change of Therapy (COT) Other Medicare Required Assessment (OMRA). This final rule includes a discussion of a provision related to the Affordable Care Act involving Civil Money Penalties. Finally, this final rule discusses the SNF therapy payment research currently underway within CMS, observed trends related to therapy utilization among SNF providers, and the agency's commitment to accelerating health information exchange in SNFs.

  7. Cleared for Launch - Lessons Learned from the OSIRIS-REx System Requirements Verification Program

    NASA Technical Reports Server (NTRS)

    Stevens, Craig; Adams, Angela; Williams, Bradley; Goodloe, Colby

    2017-01-01

    Requirements verification of a large flight system is a challenge. It is especially challenging for engineers taking on their first role in space systems engineering. This paper describes our approach to verification of the Origins, Spectral Interpretation, Resource Identification, Security-Regolith Explorer (OSIRIS-REx) system requirements. It also captures lessons learned along the way from developing systems engineers embroiled in this process. We begin with an overview of the mission and science objectives as well as the project requirements verification program strategy. A description of the requirements flow down is presented including our implementation for managing the thousands of program and element level requirements and associated verification data. We discuss both successes and methods to improve the managing of this data across multiple organizational interfaces. Our approach to verifying system requirements at multiple levels of assembly is presented using examples from our work at instrument, spacecraft, and ground segment levels. We include a discussion of system end-to-end testing limitations and their impacts to the verification program. Finally, we describe lessons learned that are applicable to all emerging space systems engineers using our unique perspectives across multiple organizations of a large NASA program.

  8. Final analysis and design of a thermal protection system for 8-foot HTST combustor

    NASA Technical Reports Server (NTRS)

    Moskowitz, S.

    1973-01-01

    The cylindrical shell combustor with T-bar supports in the 8-foot HTST at the NASA-Langley Research Center encountered vibratory fatigue cracking over a period of 50-250 tunnel tests within a limited range of the required operating envelope. A preliminary design study provided several suitable thermal protection system designs for the combustor, one of which was a two-pass regenerative type air-cooled omega-shaped segment liner. A final design layout of the omega segment liner was prepared and analyzed for steady-state and transient conditions. The design of a support system for the fuel spray bar assembly was also included. Detail drawings suitable for fabrication purposes were also prepared. Liner design problems defined during the preliminary study included (1) the ingress of gas into the attachment bulb section of the omega segment, (2) the large thermal gradient along the leg of the omega bulb attachment section and, (3) the local peak metal temperature at the radius between the liner ID and the leg of the bulb attachment. These were resolved during the final design task. Analyses of the final design of the omega segment liner indicated that all design goals were met and the design provided the capability of operating over the required test envelope with a life expectancy substantially above the goal of 1500 cycles.

  9. 78 FR 33144 - Meeting: RTCA Program Management Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... by SC-227. Final Draft, New Document, Operational and Functional Requirements and Safety Objectives... & Synthetic Vision Systems-- Discussion--Revised Terms of Reference. SC-214--Standards for Air Traffic Data...

  10. Lunar Extravehicular Activity Program

    NASA Technical Reports Server (NTRS)

    Heartsill, Amy Ellison

    2006-01-01

    Extravehicular Activity (EVA) has proven an invaluable tool for space exploration since the inception of the space program. There are situations in which the best means to evaluate, observe, explore and potentially troubleshoot space systems are accomplished by direct human intervention. EVA provides this unique capability. There are many aspects of the technology required to enable a "miniature spaceship" to support individuals in a hostile environment in order to accomplish these tasks. This includes not only the space suit assembly itself, but the tools, design interfaces of equipment on which EVA must work and the specific vehicles required to support transfer of humans between habitation areas and the external world. This lunar mission program will require EVA support in three primary areas. The first of these areas include Orbital stage EVA or micro-gravity EVA which includes both Low Earth Orbit (LEO), transfer and Lunar Orbit EVA. The second area is Lunar Lander EVA capability, which is lunar surface EVA and carries slightly different requirements from micro-gravity EVA. The third and final area is Lunar Habitat based surface EVA, which is the final system supporting a long-term presence on the moon.

  11. Design considerations for a compact infrared airborne imager to meet alignment and assembly requirements

    NASA Astrophysics Data System (ADS)

    Spencer, Harvey

    2002-09-01

    Helicopter mounted optical systems require compact packaging, good image performance (approaching the diffraction-limit), and must survive and operate in a rugged shock and thermal environment. The always-present requirement for low weight in an airborne sensor is paramount when considering the optical configuration. In addition, the usual list of optical requirements which must be satisfied within narrow tolerances, including field-of-view, vignetting, boresight, stray light rejection, and transmittance drive the optical design. It must be determined early in the engineering process which internal optical alignment adjustment provisions must be included, which may be included, and which will have to be omitted, since adding alignment features often conflicts with the requirement for optical component stability during operation and of course adds weight. When the system is to be modular and mates with another optical system, a telescope designed by different contractor in this case, additional alignment requirements between the two systems must be specified and agreed upon. Final delivered cost is certainly critical and "touch labor" assembly time must be determined and controlled. A clear plan for the alignment and assembly steps must be devised before the optical design can even begin to ensure that an arrangement of optical components amenable to adjustment is reached. The optical specification document should be written contemporaneously with the alignment plan to insure compatibility. The optics decisions that led to the success of this project are described and the final optical design is presented. A description of some unique pupil alignment adjustments, never performed by us in the infrared, is described.

  12. Technology evaluation for implementation of VMT based revenue collection systems : final report.

    DOT National Transportation Integrated Search

    2002-11-01

    The Road User Fee Task Force (RUFTF) was created as part of House Bill 3946 with the purpose of developing a new revenue collection system design for Oregons roads and highways. The Oregon Department of Transportation (ODOT) is required by House B...

  13. Phase II, Compact AMS System for Biological Tracer Detection Final Report CRADA No. TSV-1533-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, T. A.; Hamm, R. W.

    2017-11-01

    The objective of this collaboration between LLNL and AccSys Technology, Inc. of Pleasanton, California was to build and demonstrate a low cost, compact tritium (3H) Accelerator Mass Spectrometer (AMS) system matched to the requirements of biomedical research.

  14. Post-test navigation data analysis techniques for the shuttle ALT

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Postflight test analysis data processing techniques for shuttle approach and landing tests (ALT) navigation data are defined. Postfight test processor requirements are described along with operational and design requirements, data input requirements, and software test requirements. The postflight test data processing is described based on the natural test sequence: quick-look analysis, postflight navigation processing, and error isolation processing. Emphasis is placed on the tradeoffs that must remain open and subject to analysis until final definition is achieved in the shuttle data processing system and the overall ALT plan. A development plan for the implementation of the ALT postflight test navigation data processing system is presented. Conclusions are presented.

  15. Nonterrestrial material processing and manufacturing of large space systems

    NASA Technical Reports Server (NTRS)

    Von Tiesenhausen, G.

    1979-01-01

    Nonterrestrial processing of materials and manufacturing of large space system components from preprocessed lunar materials at a manufacturing site in space is described. Lunar materials mined and preprocessed at the lunar resource complex will be flown to the space manufacturing facility (SMF), where together with supplementary terrestrial materials, they will be final processed and fabricated into space communication systems, solar cell blankets, radio frequency generators, and electrical equipment. Satellite Power System (SPS) material requirements and lunar material availability and utilization are detailed, and the SMF processing, refining, fabricating facilities, material flow and manpower requirements are described.

  16. Spacecraft systems engineering: An introduction to the process at GSFC

    NASA Technical Reports Server (NTRS)

    Fragomeni, Tony; Ryschkewitsch, Michael G.

    1993-01-01

    The main objective in systems engineering is to devise a coherent total system design capable of achieving the stated requirements. Requirements should be rigid. However, they should be continuously challenged, rechallenged and/or validated. The systems engineer must specify every requirement in order to design, document, implement and conduct the mission. Each and every requirement must be logically considered, traceable and evaluated through various analysis and trade studies in a total systems design. Margins must be determined to be realistic as well as adequate. The systems engineer must also continuously close the loop and verify system performance against the requirements. The fundamental role of the systems engineer, however, is to engineer, not manage. Yet, in large, complex missions, where more than one systems engineer is required, someone needs to manage the systems engineers, and we call them 'systems managers.' Systems engineering management is an overview function which plans, guides, monitors and controls the technical execution of a project as implemented by the systems engineers. As the project moves on through Phases A and B into Phase C/D, the systems engineering tasks become a small portion of the total effort. The systems management role increases since discipline subsystem engineers are conducting analyses and reviewing test data for final review and acceptance by the systems managers.

  17. Final design proposal: Theta Group-The Hotbox. A proposal in response to a commercial air transportation study

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Hotbox is a 40 passenger commercial aircraft designed to have a minimum range of 5500 ft and cruise at a velocity of 30 ft/sec. The aircraft is designed to serve the longer range overseas market in Aeroworld. In order to serve all the airports in the overseas market, the Hotbox was required to be able to use a five foot gate. A weight requirement was set a 4.5 lbs in order to maximize aircraft efficiency. Finally, a single engine system was chosen because it minimized system weight, complexity and cost. The Hotbox is estimated to cost $152,000 Aeroworld dollars and will sell for $200.000. The propulsion system for the Hotbox consists of a nose mounted Astro 15 electric powered motor and a Top Flight 12-6 propeller. A Spica airfoil was selected for the Hotbox based on the ease of construction of its flat bottom and its positive lift and drag characteristics. A fuselage of rectangular cross section will internally contain the propulsion system, control system, and a passenger bay with 2x20 seating. A combination of directional and longitudinal control will enable the Hotbox to maneuver. The final design of the Hotbox provides for takeoff distance in 26.5 ft and normal cruise range of 17,000 ft.

  18. Digital image profilers for detecting faint sources which have bright companions

    NASA Technical Reports Server (NTRS)

    Morris, Elena; Flint, Graham; Slavey, Robert

    1992-01-01

    For this program, an image profiling system was developed which offers the potential for detecting extremely faint optical sources that are located in close proximity to bright companions. The approach employed is novel in three respects. First, it does not require an optical system wherein extraordinary measures must be taken to minimize diffraction and scatter. Second, it does not require detectors possessing either extreme uniformity in sensitivity or extreme temporal stability. Finally, the system can readily be calibrated, or nulled, in space by testing against an unresolved singular stellar source.

  19. Laser Shot Peening System Final Report CRADA No. TC-1369-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stuart, B. C.; Harris, F.

    This CRADA project was established with a primary goal to develop a laser shot peening system which could operate at production throughput rates and produce the desired depth and intensity of induced shots. The first objective was to understand all parameters required for acceptable peening, including pulse energy, pulse temporal format, pulse spatial format, sample configuration and tamping mechanism. The next objective was to demonstrate the technique on representative samples and then on representative parts. The final objective was to implement the technology into a meaningful industrial peen.

  20. Satellite Power Systems (SPS) concept definition study. Volume 6: SPS technology requirements and verification

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Volume 6 of the SPS Concept Definition Study is presented and also incorporates results of NASA/MSFC in-house effort. This volume includes a supporting research and technology summary. Other volumes of the final report that provide additional detail are as follows: (1) Executive Summary; (2) SPS System Requirements; (3) SPS Concept Evolution; (4) SPS Point Design Definition; (5) Transportation and Operations Analysis; and Volume 7, SPS Program Plan and Economic Analysis.

  1. Final Supplemental Environmental Assessment: Joint Land Attack Cruise Missile Defense Elevated Netted Sensor System (JLENS), U.S. Army Dugway Proving Ground, Dugway, Utah

    DTIC Science & Technology

    2009-09-01

    evaluate specific system equipment func- tions, performance, operations, and safety in the field environment. The planned test procedures require free space...emission of radiofrequency (RF) electromagnetic energy within a limited spectral region and controlled power spec- tral density. There would be...for personnel. The applicable DoD standard that provides required guidelines for permissible exposure limits of DoD personnel is DoD Instruction

  2. Building the Qualification File of EGNOS with DOORS

    NASA Astrophysics Data System (ADS)

    Fabre, J.

    2008-08-01

    EGNOS, the European Satellite-Based Augmentation System (SBAS) to GPS, is getting to its final deployment and being initially operated towards qualification and certification to reach operational capability by 2008/2009. A very important milestone in the development process is the System Qualification Review (QR). As the verification phase aims at demonstrating that the EGNOS System design meets the applicable requirements, the QR declares the completion of verification activities. The main document to present at QR is a consolidated, consistent and complete Qualification file. The information included shall give confidence to the QR reviewers that the performed qualification activities are completed. Therefore, an important issue for the project team is to focus on synthetic and consistent information, and to make the presentation as clear as possible. Traceability to applicable requirements shall be systematically presented. Moreover, in order to support verification justification, reference to details shall be available, and the reviewer shall have the possibility to link automatically to the documents including this detailed information. In that frame, Thales Alenia Space has implemented a strong support in terms of methodology and tool, to provide to System Engineering and Verification teams a single reference technical database, in which all team members consult the applicable requirements, compliance, justification, design data and record the information necessary to build the final Qualification file. This paper presents the EGNOS context, the Qualification file contents, and the methodology implemented, based on Thales Alenia Space practices and in line with ECSS. Finally, it shows how the Qualification file is built in a DOORS environment.

  3. 10 CFR 51.94 - Requirement to consider final environmental impact statement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to consider final environmental impact...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement...

  4. Satellite Power Systems (SPS) concept definition study (Exhibit D). Volume 7: System/subsystems requirements databook

    NASA Technical Reports Server (NTRS)

    Hanley, G. M.

    1981-01-01

    This volume summarizes the basic requirements used as a guide to systems analysis, and is a basis for the selection of candidate Satellite Power Systems (SPS) point designs. Initially, these collected data reflected the level of definition resulting from the evaluation of a broad spectrum of SPS concepts. As the various concepts matured, these requirements were updated to reflect the requirements identified for the projected satellite system/subsystem point designs. Included is an updated version of earlier Rockwell concepts using klystrons as the specific microwave power amplification approach, as well as a more in-depth definition, analysis and preliminary point design on two concepts based on the use of advanced solid state technology to accomplish the task of high power amplification of the 2.45 GHz transmitted power beam to the Earth receiver. Finally, a preliminary definition of a concept using magnetrons as the microwave power amplifiers is presented.

  5. Digital Avionics Information System (DAIS): Impact of DAIS Concept on Life Cycle Cost--Supplement. Final Report.

    ERIC Educational Resources Information Center

    Goclowski, John C.; And Others

    This supplement to a technical report providing the results of a preliminary investigation of the potential impact of the Digital Avionics Information System (DAIS) concept on system support personnel requirements and life cycle cost (LCC) includes: (1) additional details of the cost comparison of a hypothetical application of a conceptual…

  6. Digital Avionics Information System (DAIS): Impact of DAIS Concept on Life Cycle Cost. Final Report.

    ERIC Educational Resources Information Center

    Goclowski, John C.; And Others

    Designed to identify and quantify the potential impacts of the Digital Avionics Information System (DAIS) on weapon system personnel requirements and life cycle cost (LCC), this study postulated a typical close-air-support (CAS) mission avionics suite to serve as a basis for comparing present day and DAIS configuration specifications. The purpose…

  7. Analysis and Approach to the Development of an Advanced Multimedia Instructional System. Volume I. Final Report.

    ERIC Educational Resources Information Center

    Rhode, William E.; And Others

    In order to examine the possibilities for an advanced multimedia instructional system, a review and assessment of current instructional media was undertaken in terms of a functional description, instructional flexibility, support requirements, and costs. Following this, a model of an individual instructional system was developed as a basis for…

  8. Knowing the Score. A National Review of the State and Territory Training Authority Statistical Systems. Final Report.

    ERIC Educational Resources Information Center

    National Centre for Vocational Education Research, Leabrook (Australia).

    This report presents results of a project to produce a set of strategies to ensure the compatibility of Australian state and territory information systems with the requirements of the National Management Information and Statistics System (NATMISS) and the Australian Vocational Education and Training Management Information Statistical Standard…

  9. Spacecraft rendezvous operational considerations affecting vehicle systems design and configuration

    NASA Astrophysics Data System (ADS)

    Prust, Ellen E.

    One lesson learned from Orbiting Maneuvering Vehicle (OMV) program experience is that Design Reference Missions must include an appropriate balance of operations and performance inputs to effectively drive vehicle systems design and configuration. Rendezvous trajectory design is based on vehicle characteristics (e.g., mass, propellant tank size, and mission duration capability) and operational requirements, which have evolved through the Gemini, Apollo, and STS programs. Operational constraints affecting the rendezvous final approach are summarized. The two major objectives of operational rendezvous design are vehicle/crew safety and mission success. Operational requirements on the final approach which support these objectives include: tracking/targeting/communications; trajectory dispersion and navigation uncertainty handling; contingency protection; favorable sunlight conditions; acceptable relative state for proximity operations handover; and compliance with target vehicle constraints. A discussion of the ways each of these requirements may constrain the rendezvous trajectory follows. Although the constraints discussed apply to all rendezvous, the trajectory presented in 'Cargo Transfer Vehicle Preliminary Reference Definition' (MSFC, May 1991) was used as the basis for the comments below.

  10. Advanced transportation system studies. Technical area 2: Heavy lift launch vehicle development. Volume 2; Technical Results

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Sections 10 to 13 of the Advanced Transportation System Studies final report are included in this volume. Section 10 contains a copy of an executive summary that was prepared by Lockheed Space Operations Company (LSOC) to document their support to the TA-2 contract during the first-year period of performance of the contract, May 1992 through May 1993. LSOC participated on the TA-2 contract as part of the concurrent engineering launch system definition team, and provided outstanding heavy lift launch vehicle (HLLV) ground operations requirements and concept assessments for Lockheed Missiles and Space Company (LMSC) through an intercompany work transfer as well as providing specific HLLV ground operations assessments at the direction of NASA KSC through KSC funding that was routed to the TA-2 contract. Section 11 contains a copy of a vehicle-independent, launch system health management requirements assessment. The purpose of the assessment was to define both health management requirements and the associated interfaces between a generic advanced transportation system launch vehicle and all related elements of the entire transportation system, including the ground segment. Section 12 presents the major TA-2 presentations provided to summarize the significant results and conclusions that were developed over the course of the contract. Finally, Section 13 presents the design and assessment report on the first lunar outpost heavy lift launch vehicle.

  11. Medicare program; hospital inpatient prospective payment systems for acute care hospitals and the long-term care hospital prospective payment system and fiscal year 2013 rates; hospitals' resident caps for graduate medical education payment purposes; quality reporting requirements for specific providers and for ambulatory surgical centers. final rule.

    PubMed

    2012-08-31

    We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital-related costs of acute care hospitals to implement changes arising from our continuing experience with these systems. Some of the changes implement certain statutory provisions contained in the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and other legislation. These changes will be applicable to discharges occurring on or after October 1, 2012, unless otherwise specified in this final rule. We also are updating the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits. The updated rate-of-increase limits will be effective for cost reporting periods beginning on or after October 1, 2012. We are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) and implementing certain statutory changes made by the Affordable Care Act. Generally, these changes will be applicable to discharges occurring on or after October 1, 2012, unless otherwise specified in this final rule. In addition, we are implementing changes relating to determining a hospital's full-time equivalent (FTE) resident cap for the purpose of graduate medical education (GME) and indirect medical education (IME) payments. We are establishing new requirements or revised requirements for quality reporting by specific providers (acute care hospitals, PPS-exempt cancer hospitals, LTCHs, and inpatient psychiatric facilities (IPFs)) that are participating in Medicare. We also are establishing new administrative, data completeness, and extraordinary circumstance waivers or extension requests requirements, as well as a reconsideration process, for quality reporting by ambulatory surgical centers (ASCs) that are participating in Medicare. We are establishing requirements for the Hospital Value-Based Purchasing (VBP) Program and the Hospital Readmissions Reduction Program.

  12. 75 FR 1003 - Submission for OMB Review; Comment Request;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... internal risk management controls to assist it in managing the risks associated with its business... money laundering and terrorist financing as part of its internal risk management control system. Finally, Rule 17i-4 requires that an SIBHC periodically review its internal risk management control system for...

  13. MHEG Based Distance Learning System on Information Superhighway.

    ERIC Educational Resources Information Center

    Lee, SeiHoon; Yoon, KyungSeob; Wang, ChangJong

    As the need for distance education grows, requirements for the development of high-speed network-based real-time distance learning systems increases. MHEG-5 is the fifth part of the MHEG (Multimedia and Hypermedia information coding Experts Group) standard, and it defines a final-form representation for application interchange. This paper…

  14. 78 FR 21389 - Notice of Issuance of Final Determination Concerning Certain Ultrasound Systems

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... ultrasound units, known as the S2000 and Antares ultrasound systems, engineered, designed, and subject to... healthcare professionals. One of the most critical elements required for the manufacture of a functional... use of licensing keys. Manufacturing Process Electronics Module Assembly: You state that the...

  15. 78 FR 2438 - Agency Information Collection Activities; Existing Collection, Comments Requested: The National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... Collection, Comments Requested: The National Instant Criminal Background Check System (NICS) Point-of-Contact... Background Check System (NICS) Point-of-Contact (POC) State Final Determination Electronic Submission. (3... required to respond, as well as a brief abstract: Primary: Full Point-of-Contact (POC) States; Partial POC...

  16. 43 CFR 17.4 - Assurances required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... school system (1) is subject to a final order of a court of the United States for the desegregation of... court of the United States for the desegregation of such school or school system is entered after... other participants. Any such assurance shall include provisions which give the United States a right to...

  17. Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal Year 2018. Final rule.

    PubMed

    2017-08-03

    This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2018 as required by the statute. As required by section 1886(j)(5) of the Social Security Act (the Act), this rule includes the classification and weighting factors for the IRF prospective payment system's (IRF PPS) case-mix groups and a description of the methodologies and data used in computing the prospective payment rates for FY 2018. This final rule also revises the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM) diagnosis codes that are used to determine presumptive compliance under the "60 percent rule," removes the 25 percent payment penalty for inpatient rehabilitation facility patient assessment instrument (IRF-PAI) late transmissions, removes the voluntary swallowing status item (Item 27) from the IRF-PAI, summarizes comments regarding the criteria used to classify facilities for payment under the IRF PPS, provides for a subregulatory process for certain annual updates to the presumptive methodology diagnosis code lists, adopts the use of height/weight items on the IRF-PAI to determine patient body mass index (BMI) greater than 50 for cases of single-joint replacement under the presumptive methodology, and revises and updates measures and reporting requirements under the IRF quality reporting program (QRP).

  18. Science Goals to Requirements

    NASA Technical Reports Server (NTRS)

    Reuter, Dennis

    2015-01-01

    The presentation will be given at the 26th Annual Thermal Fluids Analysis Workshop (TFAWS 2015) hosted by the Goddard SpaceFlight Center (GSFC) Thermal Engineering Branch (Code 545): This short course will present the science goals for a variety of types of imaging and spectral measurements, the thermal requirements that these goals impose on the instruments designed to obtain the measurements, and some of the types of trades that can be made among instrument subsystems to ensure the required performance is maintained. Examples of thermal system evolution from initial concept to final implementation will be given for several actual systems.

  19. Spectrum analysis on quality requirements consideration in software design documents.

    PubMed

    Kaiya, Haruhiko; Umemura, Masahiro; Ogata, Shinpei; Kaijiri, Kenji

    2013-12-01

    Software quality requirements defined in the requirements analysis stage should be implemented in the final products, such as source codes and system deployment. To guarantee this meta-requirement, quality requirements should be considered in the intermediate stages, such as the design stage or the architectural definition stage. We propose a novel method for checking whether quality requirements are considered in the design stage. In this method, a technique called "spectrum analysis for quality requirements" is applied not only to requirements specifications but also to design documents. The technique enables us to derive the spectrum of a document, and quality requirements considerations in the document are numerically represented in the spectrum. We can thus objectively identify whether the considerations of quality requirements in a requirements document are adapted to its design document. To validate the method, we applied it to commercial software systems with the help of a supporting tool, and we confirmed that the method worked well.

  20. Saguaro Power Plant Solar Repowering Project. Volume II. System requirements specification. Final technical report, September 1979-July 1980

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, E.R.

    1980-07-01

    This specification defines the system and subsystem characteristics, design requirements, and system environmental requirements for the Saguaro Power Plant Solar Repowering Project. This project involves the solar repowering of all (120.2 MWe gross) of the 115 MWe net power No. One steam-Rankine unit of the Arizona Public Service Company's Saguaro station. The receiver heat transport fluid is draw salt (60% sodium nitrate and 40% potassium nitrate) that is also used to provide 3.8 hours of sensible heat thermal energy storage. The quad-cavity type receiver is mounted on a tower within a single surrounding collector field of 10,500 second generation heliostats.

  1. Cost effective solar hot water system for Econo-Travel Motor Hotel, Chesapeake, Virginia. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-12-01

    The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 4725 W. Military Highway, Chesapeake, Virginia, is presented. The description of the system along with the final breakdown performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers usedmore » for the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less

  2. Cost effective solar hot water system for Econo-Travel Motor Hotel located at Woodbrdge, VA. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-11-01

    The final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 13317 Gordon Boulevard, Woodbridge, Virginia is given. The description of the system along with the final breakdown, performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 7.2 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryers used formore » the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less

  3. 48 CFR 32.1110 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... System for Award Management (SAM) database and maintain registration until final payment, unless— (i..., or a similar agency clause that requires the contractor to be registered in the SAM database. (ii)(A...

  4. 48 CFR 32.1110 - Solicitation provision and contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... System for Award Management (SAM) database and maintain registration until final payment, unless— (i..., or a similar agency clause that requires the contractor to be registered in the SAM database. (ii)(A...

  5. Performance planning for rural planning organizations - final report.

    DOT National Transportation Integrated Search

    2017-02-01

    Recent federal rules place increased emphasis on performance-based management of the multimodal : transportation system and require the use of performance based methods in state, metropolitan, and : non-metropolitan transportation planning and progra...

  6. 10 CFR 603.660 - Other audit requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Affecting Participants' Financial, Property, and Purchasing Systems Financial Matters § 603.660 Other audit... working papers until the matter is resolved and final action taken). (g) Who will have access to the IPA's...

  7. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  8. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  9. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  10. 40 CFR 258.61 - Post-closure care requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the final cover; (2) Maintaining and operating the leachate collection system in accordance with the... stop managing leachate if the owner or operator demonstrates that leachate no longer poses a threat to...

  11. Collaboration Mechanism for Equipment Instruction of Multiple Energy Systems

    NASA Astrophysics Data System (ADS)

    Wang, Dong; Wang, Tuo; Wang, Qi; Zhang, Zhao; Zhao, Mingyu; Wang, Yinghui

    2018-01-01

    When multiple energy systems execute optimization instructions simultaneously, and the same equipment is Shared, the instruction conflict may occur. Aiming at the above problems, taking into account the control objectives of each system, the characteristics of different systems, such as comprehensive clean energy, energy efficiency, and peak filling, etc., designed the instruction coordination mechanism for the daemon. This mechanism mainly acts on the main station of the system, and form a final optimization instruction. For some specific scenarios, the collaboration mechanism of unlocking the terminal is supplemented. The mechanism determines the specific execution instructions based on the arrival time of the instruction. Finally, the experiment in Tianjin eco-city shows that this algorithm can meet the instruction and collaboration requirements of multi-energy systems, and ensure the safe operation of the equipment.

  12. Light Armored Vehicle (LAV) Task and Media Analysis for the U.S. Marine Corps LAV-25.

    DTIC Science & Technology

    1983-08-26

    recommendations for literature to be ordered from DTIC. Finally, the Marketing Manager for International Laser Systems, Mr. Haro Schneider, was...in FIRE ( nline ).X 7.3.2 Wait five seconds. Press misfire reset warning indicator. x E-32 .. , HANDS-ON TRAINING TRAINING REQUIRED REQUIRED 7.3.3 Close

  13. MONTAGE: A Methodology for Designing Composable End-to-End Secure Distributed Systems

    DTIC Science & Technology

    2012-08-01

    83 7.6 Formal Model of Loc Separation . . . . . . . . . . . . . . . . . . . . . . . . . 84 7.6.1 Static Partitions...Next, we derive five requirements (called Loc Separation, Implicit Parameter Separation, Error Signaling Separation, Conf Separation, and Next Call...hypervisors and hardware) and a real cloud (with shared hypervisors and hardware) that satisfies these requirements. Finally we study Loc Separation

  14. 77 FR 39125 - Defense Acquisition Regulations System; Defense Federal Acquisition Regulation Supplement; Only...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... resolicitation period has been added to address the application to small business set-asides. The final rule... transactional process time in all cases where only a single offer is received in response to a competitive... requirement, if only one offer is received, has also been added for small business set-asides. c. Requirements...

  15. Establishment of revisit user fee program for Medicare survey and certification activities. Final rule.

    PubMed

    2007-09-19

    This final rule will establish a system of revisit user fees applicable to health care facilities that have been cited for deficiencies during initial certification, recertification, or substantiated complaint surveys and require a revisit to confirm that corrections to previously-identified deficiencies have been remedied. Consistent with the President's long-term goal to promote quality of health care and to cut the deficit in half by fiscal year (FY) 2009, the FY 2007 Department of Health and Human Services' (HHS) budget request included both new mandatory savings proposals and a requirement that user fees be applied to health care providers that have failed to comply with Federal quality of care requirements. The "Revisit User Fees" will affect only those providers or suppliers for which a revisit is required to confirm that previously-identified failures to meet federal quality of care requirements have been remedied. The fees are estimated at $37.3 million annually and will recover the costs associated with the Medicare Survey and Certification program's revisit surveys. The fees will take effect on the date of publication of the final rule and will be in effect until the date that the continued authority provided by Congress expires. At the time of publication of this regulation the applicable date is September 30, 2007. If no legislation is enacted, the fees are not retroactive to the beginning of the fiscal year. Any provider or supplier that has a revisit survey conducted on or after the date of publication will be assessed a revisit user fee and will be notified of the assessment upon data system reconciliation which can occur following the closing of the fiscal year. The fees will be available to CMS until expended. The revisit user fee is included in the President's proposed FY 2008 budget. We note through the publication of this final rule that if authority for the revisit user fee is continued, we will use the current fee schedule in this rule for the assessment of such fees until such time as a new fee schedule notice is proposed and published in final form.

  16. Material Challenges and Opportunities for Commercial Electric Aircraft

    NASA Technical Reports Server (NTRS)

    Misra, Ajay

    2014-01-01

    Significant reduction in carbon dioxide emission for future air transportation system will require adoption of electric propulsion system and more electric architectures. Various options for aircraft electric propulsion include hybrid electric, turboelectric, and full electric system. Realization of electric propulsion system for commercial aircraft applications will require significant increases in power density of electric motors and energy density of energy storage system, such as the batteries and fuel cells. In addition, transmission of MW of power in the aircraft will require high voltage power transmission system to reduce the weight of the power transmission system. Finally, there will be significant thermal management challenges. Significant advances in material technologies will be required to meet these challenges. Technologies of interest include materials with higher electrical conductivity than Cu, high thermal conductivity materials, and lightweight electrically insulating materials with high breakdown voltage, high temperature magnets, advanced battery and fuel cell materials, and multifunctional materials. The presentation will include various challenges for commercial electric aircraft and provide an overview of material improvements that will be required to meet these challenges.

  17. Medicare Program; Prospective Payment System and Consolidated Billing for Skilled Nursing Facilities (SNFs) for FY 2016, SNF Value-Based Purchasing Program, SNF Quality Reporting Program, and Staffing Data Collection. Final Rule.

    PubMed

    2015-08-04

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs) for fiscal year (FY) 2016. In addition, it specifies a SNF all-cause all-condition hospital readmission measure, as well as adopts that measure for a new SNF Value-Based Purchasing (VBP) Program, and includes a discussion of SNF VBP Program policies we are considering for future rulemaking to promote higher quality and more efficient health care for Medicare beneficiaries. Additionally, this final rule will implement a new quality reporting program for SNFs as specified in the Improving Medicare Post-Acute Care Transformation Act of 2014 (IMPACT Act). It also amends the requirements that a long-term care (LTC) facility must meet to qualify to participate as a skilled nursing facility (SNF) in the Medicare program, or a nursing facility (NF) in the Medicaid program, by establishing requirements that implement the provision in the Affordable Care Act regarding the submission of staffing information based on payroll data.

  18. Advance Technology Satellites in the Commercial Environment. Volume 2: Final Report

    NASA Technical Reports Server (NTRS)

    1984-01-01

    A forecast of transponder requirements was obtained. Certain assumptions about system configurations are implicit in this process. The factors included are interpolation of baseline year values to produce yearly figures, estimation of satellite capture, effects of peak-hours and the time-zone staggering of peak hours, circuit requirements for acceptable grade of service capacity of satellite transponders, including various compression methods where applicable, and requirements for spare transponders in orbit. The graphical distribution of traffic requirements was estimated.

  19. Sensing systems efficiency evaluation and comparison for homeland security and homeland defense

    NASA Astrophysics Data System (ADS)

    Pakhomov, Alexander A.

    2010-04-01

    Designers and consumers of various security, intelligence, surveillance and reconnaissance (ISR) systems as well as various unattended ground sensors pay most attention to their commonly used performance characteristics such as probability of a target detection and probability of a false alarm. These characteristics are used for systems comparison and evaluation. However, it is not enough for end-users of these systems as well as for their total/final effectiveness assessment. This article presents and discusses a system approach to an efficiency estimation of the security and ISR systems. Presented approach aims at final result of the system's function and use. It allows setting up reasonable technical and structural requirements for the security and ISR systems, to make trustworthy comparison and practical application planning of such systems. It also allows finding forward-looking, perspective ways of systems development. Presented results can be guidance to both designers and consumers.

  20. 40 CFR Appendix L to Subpart G of... - Substitutes Listed in the January 27, 2003, Final Rule, Effective March 28, 2003

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environments protected by HFC227-BC extinguishing systemsEach HFC227-BC extinguisher should be clearly labelled... Agent Fire Extinguishing Systems. See additional comments 1, 2, 3, 4, 5. Additional comments. 1—Should... or performance requirements. 4—The agent should be recovered from the fire protection system in...

  1. 40 CFR Appendix L to Subpart G of... - Substitutes Listed in the January 27, 2003, Final Rule, Effective March 28, 2003

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environments protected by HFC227-BC extinguishing systemsEach HFC227-BC extinguisher should be clearly labelled... Agent Fire Extinguishing Systems. See additional comments 1, 2, 3, 4, 5. Additional comments. 1—Should... or performance requirements. 4—The agent should be recovered from the fire protection system in...

  2. 40 CFR Appendix L to Subpart G of... - Substitutes Listed in the January 27, 2003, Final Rule, Effective March 28, 2003

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environments protected by HFC227-BC extinguishing systemsEach HFC227-BC extinguisher should be clearly labelled... Agent Fire Extinguishing Systems. See additional comments 1, 2, 3, 4, 5. Additional comments. 1—Should... or performance requirements. 4—The agent should be recovered from the fire protection system in...

  3. Developing the Systems Engineering Experience Accelerator (SEEA) Prototype and Roadmap

    DTIC Science & Technology

    2012-10-24

    system attributes. These metrics track non-requirements performance, typically relate to production cost per unit, maintenance costs, training costs...immediately implement lessons learned from the training experience to the job, assuming the culture allows this. 1.3 MANAGEMENT PLAN/TECHNICAL OVERVIEW...resolving potential conflicts as they arise. Incrementally implement and continuously integrate capability in priority order, to ensure that final system

  4. Design, Specification, and Synthesis of Aircraft Electric Power Systems Control Logic

    NASA Astrophysics Data System (ADS)

    Xu, Huan

    Cyber-physical systems integrate computation, networking, and physical processes. Substantial research challenges exist in the design and verification of such large-scale, distributed sensing, actuation, and control systems. Rapidly improving technology and recent advances in control theory, networked systems, and computer science give us the opportunity to drastically improve our approach to integrated flow of information and cooperative behavior. Current systems rely on text-based specifications and manual design. Using new technology advances, we can create easier, more efficient, and cheaper ways of developing these control systems. This thesis will focus on design considerations for system topologies, ways to formally and automatically specify requirements, and methods to synthesize reactive control protocols, all within the context of an aircraft electric power system as a representative application area. This thesis consists of three complementary parts: synthesis, specification, and design. The first section focuses on the synthesis of central and distributed reactive controllers for an aircraft elec- tric power system. This approach incorporates methodologies from computer science and control. The resulting controllers are correct by construction with respect to system requirements, which are formulated using the specification language of linear temporal logic (LTL). The second section addresses how to formally specify requirements and introduces a domain-specific language for electric power systems. A software tool automatically converts high-level requirements into LTL and synthesizes a controller. The final sections focus on design space exploration. A design methodology is proposed that uses mixed-integer linear programming to obtain candidate topologies, which are then used to synthesize controllers. The discrete-time control logic is then verified in real-time by two methods: hardware and simulation. Finally, the problem of partial observability and dynamic state estimation is explored. Given a set placement of sensors on an electric power system, measurements from these sensors can be used in conjunction with control logic to infer the state of the system.

  5. Application of aircraft navigation sensors to enhanced vision systems

    NASA Technical Reports Server (NTRS)

    Sweet, Barbara T.

    1993-01-01

    In this presentation, the applicability of various aircraft navigation sensors to enhanced vision system design is discussed. First, the accuracy requirements of the FAA for precision landing systems are presented, followed by the current navigation systems and their characteristics. These systems include Instrument Landing System (ILS), Microwave Landing System (MLS), Inertial Navigation, Altimetry, and Global Positioning System (GPS). Finally, the use of navigation system data to improve enhanced vision systems is discussed. These applications include radar image rectification, motion compensation, and image registration.

  6. Feasibility of Energy-Autonomous Wireless Microsensors for Biomedical Applications: Powering and Communication.

    PubMed

    Goodarzy, Farhad; Skafidas, Efstratios Stan; Gambini, Simone

    2015-01-01

    In this review, biomedical-related wireless miniature devices such as implantable medical devices, neural prostheses, embedded neural systems, and body area network systems are investigated and categorized. The two main subsystems of such designs, the RF subsystem and the energy source subsystem, are studied in detail. Different application classes are considered separately, focusing on their specific data rate and size characteristics. Also, the energy consumption of state-of-the-art communication practices is compared to the energy that can be generated by current energy scavenging devices, highlighting gaps and opportunities. The RF subsystem is classified, and the suitable architecture for each category of applications is highlighted. Finally, a new figure of merit suitable for wireless biomedical applications is introduced to measure the performance of these devices and assist the designer in selecting the proper system for the required application. This figure of merit can effectively fill the gap of a much required method for comparing different techniques in simulation stage before a final design is chosen for implementation.

  7. Accommodating Thickness in Origami-Based Deployable Arrays

    NASA Technical Reports Server (NTRS)

    Zirbel, Shannon A.; Magleby, Spencer P.; Howell, Larry L.; Lang, Robert J.; Thomson, Mark W.; Sigel, Deborah A.; Walkemeyer, Phillip E.; Trease, Brian P.

    2013-01-01

    The purpose of this work is to create deployment systems with a large ratio of stowed-to-deployed diameter. Deployment from a compact form to a final flat state can be achieved through origami-inspired folding of panels. There are many models capable of this motion when folded in a material with negligible thickness; however, when the application requires the folding of thick, rigid panels, attention must be paid to the effect of material thickness not only on the final folded state, but also during the folding motion (i.e., the panels must not be required to flex to attain the final folded form). The objective is to develop new methods for deployment from a compact folded form to a large circular array (or other final form). This paper describes a mathematical model for modifying the pattern to accommodate material thickness in the context of the design, modeling, and testing of a deployable system inspired by an origami six-sided flasher model. The model is demonstrated in hardware as a 1/20th scale prototype of a deployable solar array for space applications. The resulting prototype has a ratio of stowed-to-deployed diameter of 9.2 (or 1.25 m deployed outer diameter to 0.136 m stowed outer diameter).

  8. Detection technology for IVHS : Volume I: Final Report

    DOT National Transportation Integrated Search

    1996-12-01

    The Detection Technology for the IVHS project identified traffic parameters and their required accuracies for characterizing traffic flow in conventional and newer intelligent transportation systems (ITS); obtained state-of-the-art detectors and inst...

  9. Accessibility handbook for transit facilities

    DOT National Transportation Integrated Search

    This document is a handbook that will help architects, engineers, and transit system managers to understand and follow : the Federal Government regulations contained in the Final Rule, 49 CFR Part 37, which describes the requirements for : transporta...

  10. 77 FR 47065 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... activities: Construction Buildings........ 236 Heavy and Civil Engineering 237 Construction. EPA does not... permit may not be challenged later in civil or criminal proceedings to enforce these requirements. In...

  11. Final report on the portable weather station.

    DOT National Transportation Integrated Search

    2010-03-01

    This station was required to have air temperature, relative humidity, wind speed and direction, and : pavement temperature sensors of similar quality to the traditional RWIS sensors, have an integrated solar : powered battery system, and be trailer...

  12. Quantification of Dynamic Model Validation Metrics Using Uncertainty Propagation from Requirements

    NASA Technical Reports Server (NTRS)

    Brown, Andrew M.; Peck, Jeffrey A.; Stewart, Eric C.

    2018-01-01

    The Space Launch System, NASA's new large launch vehicle for long range space exploration, is presently in the final design and construction phases, with the first launch scheduled for 2019. A dynamic model of the system has been created and is critical for calculation of interface loads and natural frequencies and mode shapes for guidance, navigation, and control (GNC). Because of the program and schedule constraints, a single modal test of the SLS will be performed while bolted down to the Mobile Launch Pad just before the first launch. A Monte Carlo and optimization scheme will be performed to create thousands of possible models based on given dispersions in model properties and to determine which model best fits the natural frequencies and mode shapes from modal test. However, the question still remains as to whether this model is acceptable for the loads and GNC requirements. An uncertainty propagation and quantification (UP and UQ) technique to develop a quantitative set of validation metrics that is based on the flight requirements has therefore been developed and is discussed in this paper. There has been considerable research on UQ and UP and validation in the literature, but very little on propagating the uncertainties from requirements, so most validation metrics are "rules-of-thumb;" this research seeks to come up with more reason-based metrics. One of the main assumptions used to achieve this task is that the uncertainty in the modeling of the fixed boundary condition is accurate, so therefore that same uncertainty can be used in propagating the fixed-test configuration to the free-free actual configuration. The second main technique applied here is the usage of the limit-state formulation to quantify the final probabilistic parameters and to compare them with the requirements. These techniques are explored with a simple lumped spring-mass system and a simplified SLS model. When completed, it is anticipated that this requirements-based validation metric will provide a quantified confidence and probability of success for the final SLS dynamics model, which will be critical for a successful launch program, and can be applied in the many other industries where an accurate dynamic model is required.

  13. Automated personnel data base system specifications, Task V. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bartley, H.J.; Bocast, A.K.; Deppner, F.O.

    1978-09-01

    This document is the General Research Corporation report on Task V of a study for the Office of Inspection and Enforcement of the Nuclear Regulatory Commission (NRC/IE). The full title of this study is ''Development of Qualification Requirements, Training Programs, Career Plans, and Methodologies for Effective Management and Training of Inspection and Enforcement Personnel.'' Task V required the development of an automated personnel data base system for NRC/IE. This system is identified as the NRC/IE Personnel, Assignment, Qualifications, and Training System (PAQTS). This Task V report provides the documentation for PAQTS including the Functional Requirements Document (FRD), the Data Requirementsmore » Document (DRD), the Hardware and Software Capabilities Assessment, and the Detailed Implementation Schedule. Specific recommendations to facilitate implementation of PAQTS are also included.« less

  14. Design of a Personnel and Training Information System for Educational R&D Personnel. Final Report.

    ERIC Educational Resources Information Center

    Hood, Paul D.; McCutchan, Nancy A.

    The primary objective of this project was to design a system to provide information services that would fulfill the information requirements of federal planners, instructional material developers, training program directors and instructors, students, interns, employers, and practitioners concerned with problems relating to personnel and training…

  15. Low-Cost Terminal Alternative for Learning Center Managers. Final Report.

    ERIC Educational Resources Information Center

    Nix, C. Jerome; And Others

    This study established the feasibility of replacing high performance and relatively expensive computer terminals with less expensive ones adequate for supporting specific tasks of Advanced Instructional System (AIS) at Lowry AFB, Colorado. Surveys of user requirements and available devices were conducted and the results used in a system analysis.…

  16. Microfiche Storage and Retrieval System Study: Final Report.

    ERIC Educational Resources Information Center

    Wicker, Roger; And Others

    System Development Corporation's (SDC) exploration of microform state-of-the-art and current research reveals developments which will be applicable to the requirements of many small Department of Defense (DoD) users and similar facilities in the next two to five years. The study's survey of the small user population reveals a variety of user…

  17. On board processor development for NASA's spaceborne imaging radar with system-on-chip technology

    NASA Technical Reports Server (NTRS)

    Fang, Wai-Chi

    2004-01-01

    This paper reports a preliminary study result of an on-board spaceborne SAR processor. It consists of a processing requirement analysis, functional specifications, and implementation with system-on-chip technology. Finally, a minimum version of this on-board processor designed for performance evaluation and for partial demonstration is illustrated.

  18. Cargo Movement Operations System (CMOS) Final System Segment Specification (Change 04), Increment II

    DTIC Science & Technology

    1991-11-14

    ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: SSS-002 PROGRAM OFFICE...only used for air cargo, does not alter the requirement for a surface cargo checklist. CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [

  19. 40 CFR 62.15215 - What is required for my continuous opacity monitoring system and how are the data used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial evaluation of your continuous opacity monitoring system according to Performance Specification 1 in appendix B of 40 CFR part 60. Complete this evaluation by 180 days after your final compliance... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF STATE PLANS...

  20. Metabolic support for a lunar base

    NASA Technical Reports Server (NTRS)

    Sauer, R. L.

    1985-01-01

    A review of the metabolic support systems used and the metabolic support requirements provided on past and current spaceflight programs is presented. This review will provide familiarization with unique constraints of space flight and technology as it relates to inflight metabolic support of astronauts. This information, along with a general review of the NASA effort to develop a Controlled Ecological Life Support System (CELSS) will define the general scenario of metabolic support for a lunar base. A phased program of metabolic support for a lunar base will be elucidated. Included will be discussion of the CELSS water reclamation and food recycling technology as it now exists and how it could be expected to be progressively incorporated into the lunar base. This transition would be from a relatively open system in the initial development period, when mechanical phase change water reclamation and minimal plant growth are incorporated, to the final period when practically total closure of the life support system will be proved through physicochemical and biological processes. Finally, a review of the estimated metabolic intake requirements for the occupants of a lunar base will be presented.

  1. Evaluation of apically extruded debris during root canal retreatment with several NiTi systems.

    PubMed

    Dincer, A N; Er, O; Canakci, B C

    2015-12-01

    To compare the amount of debris extruded apically during root canal retreatment using ProTaper, Mtwo and Reciproc instruments with hand H-files. In total, 60 freshly extracted human mandibular incisor teeth were used. All root canals were prepared with a Reciproc R25 file than filled with Gutta-percha and AH Plus sealer using cold lateral condensation before being assigned randomly to four groups (n = 15 each). In group 1, root fillings were removed with the Protaper Universal retreatment system; ProTaper Universal F3 and F4 instruments were used for the final preparation. In group 2, root fillings were removed with the Mtwo retreatment system; Mtwo size 30, .06 taper, size 35, .06 taper and size 40, .06 taper files were used for the final preparation. In group 3, root fillings were removed with Reciproc R25 instruments; Reciproc R40 instruments were used for the final preparation. In group 4, the root fillings were removed with Gates Glidden burs and sizes 35, 30 and 25 H-files; for final preparation, a size 40 H-file was used. Glass vials were used for debris collection. The vials were weighed before and after Gutta-percha removal. Additionally, the times required for the retreatment procedures were recorded. Data were analysed statistically using one-way analysis of variance. The Reciproc system produced significantly smaller amounts of apical extruded debris than the other groups (P < 0.05). There was no significant difference between the Mtwo, H-file and ProTaper groups. The ProTaper and Reciproc groups required significantly less time than the Mtwo and H-file groups (P < 0.001). Use of the reciprocating single file system resulted in the extrusion of significantly less debris compared with the full-sequence rotary NiTi instruments and hand filing. Use of the ProTaper and Reciproc instruments required less time for retreatment procedures than use of the Mtwo or H-file. © 2014 International Endodontic Journal. Published by John Wiley & Sons Ltd.

  2. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 4: Solar electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  3. Conceptual design of a Mars transportation system

    NASA Astrophysics Data System (ADS)

    1992-08-01

    In conjunction with NASA Marshall Space Flight Center and several major aerospace corporations the University of Minnesota has developed a scenario to place humans on Mars by the year 2016. The project took the form of a year-long design course in the senior design curricula at the University's Aerospace Engineering and Mechanics Department. Students worked with the instructor, teaching assistants and engineers in industry to develop a vehicle and the associated mission profile to fulfill the requirements of the Mars Transportation System. This report is a summary of the final design and the process though which the final product was developed.

  4. The Mini-Earth facility and present status of habitation experiment program.

    PubMed

    Nitta, Keiji

    2005-01-01

    The history of construction of the CEEF (the Mini-Earth), the configuration and scale of the CEEF are initially described. The effective usable areas in plant cultivation and animal holding and habitation modules and the accommodation equipment installed in each module are also explained. Mechanisms of the material circulation systems belonging to each module and subsystems in each material circulation system are introduced. Finally the results of pre-habitation experiments conducted until the year 2004 for clarifying the requirements in order to promote final closed habitation experiments are shown. c2005 Published by Elsevier Ltd on behalf of COSPAR.

  5. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 2: Cryo/aerobrake vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.

  6. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 5: Nuclear electric propulsion vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  7. Space transfer concepts and analysis for exploration missions. Implementation plan and element description document (draft final). Volume 3: Nuclear thermal rocket vehicle

    NASA Technical Reports Server (NTRS)

    1991-01-01

    This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.

  8. Conceptual design of a Mars transportation system

    NASA Technical Reports Server (NTRS)

    1992-01-01

    In conjunction with NASA Marshall Space Flight Center and several major aerospace corporations the University of Minnesota has developed a scenario to place humans on Mars by the year 2016. The project took the form of a year-long design course in the senior design curricula at the University's Aerospace Engineering and Mechanics Department. Students worked with the instructor, teaching assistants and engineers in industry to develop a vehicle and the associated mission profile to fulfill the requirements of the Mars Transportation System. This report is a summary of the final design and the process though which the final product was developed.

  9. Study of data collection platform concepts: Data collection system user requirements

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The overall purpose of the survey was to provide real world data on user requirements. The intent was to assess data collection system user requirements by questioning actual potential users rather than speculating on requirements. The end results of the survey are baseline requirements models for both a data collection platform and a data collection system. These models were derived from the survey results. The real value of these models lies in the fact that they are based on actual user requirements as delineated in the survey questionnaires. Some users desire data collection platforms of small size and light weight. These sizes and weights are beyond the present state of the art. Also, the survey provided a wealth of information on the nature and constituency of the data collection user community as well as information on user applications for data collection systems. Finally, the data sheds light on the generalized platform concept. That is, the diversity of user requirements shown in the data indicates the difficulty that can be anticipated in attempting to implement such a concept.

  10. Compact Power Conditioning and RF Systems for a High Power RF Source

    DTIC Science & Technology

    2008-12-01

    RF systems have increasing potential for application by the Army. High power RF, or high power microwave ( HPM ), systems can disrupt or disable...that are small, lightweight, portable, and use an independent energy source. The resulting system will be able to produce HPM from a compact package...The consortium was formed to advance the technology of the components required for a compact HPM source with the final goal of full system

  11. Principles for system level electrochemistry

    NASA Technical Reports Server (NTRS)

    Thaller, L. H.

    1986-01-01

    The higher power and higher voltage levels anticipated for future space missions have required a careful review of the techniques currently in use to preclude battery problems that are related to the dispersion characteristics of the individual cells. Not only are the out-of-balance problems accentuated in these larger systems, but the thermal management considerations also require a greater degree of accurate design. Newer concepts which employ active cooling techniques are being developed which permit higher rates of discharge and tighter packing densities for the electrochemical components. This paper will put forward six semi-independent principles relating to battery systems. These principles will progressively address cell, battery and finally system related aspects of large electrochemical storage systems.

  12. Study of Man-Machine Communications Systems for Disabled Persons (The Handicapped). Volume VI. Final Report.

    ERIC Educational Resources Information Center

    Kafafian, Haig

    The instruction manual contains lessons for teaching severely physically and/or neurologically handicapped students to use the seven-key Cybertype electric writing machine. Unlike the 14-key keyboard, which requires bilateral coordination in arms, legs, or other parts of the body, the seven-key keyboard requires the use of only one part of the…

  13. Digital controls for gas turbine engines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robinson, K.

    1987-01-01

    This paper begins by first describing the simplistic requirements of a gas turbine engine; how these requirements are best satisfied, frequently with the aid of electronic control systems; what the trade-off between integrity and reliability means; and finally, but forming a major section, this paper describes in qualitative detail a few of the current programmes for Full Authority Digital Engine Controls (FADEC).

  14. Load converter interactions with the secondary system in the Space Station Freedom power management and distribution DC test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.

    1992-01-01

    The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF Program design and development phases, a system Power Management and Distribution (PMAD) DC test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

  15. Load converter interactions with the secondary system in the Space Station Freedom power management and distribution dc test bed

    NASA Technical Reports Server (NTRS)

    Lebron, Ramon C.

    1992-01-01

    The NASA LeRC in Cleveland, Ohio, is responsible for the design, development, and assembly of the Space Station Freedom (SSF) Electrical Power System (EPS). In order to identify and understand system level issues during the SSF program design and development phases, a system Power Management and Distribution (PMAD) dc test bed was assembled. Some of the objectives of this test bed facility are the evaluation of, system efficiency, power quality, system stability, and system protection and reconfiguration schemes. In order to provide a realistic operating scenario, dc Load Converter Units are used in the PMAD dc test bed to characterize the user interface with the power system. These units are dc to dc converters that provide the final system regulation before power is delivered to the load. This final regulation is required on the actual space station because the majority of user loads will require voltage levels different from the secondary bus voltage. This paper describes the testing of load converters in an end to end system environment (from solar array to loads) where their interactions and compatibility with other system components are considered. Some of the system effects of interest that are presented include load converters transient behavior interactions with protective current limiting switchgear, load converters ripple effects, and the effects of load converter constant power behavior with protective features such as foldback.

  16. Technical parameters for specifying imagery requirements

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.; Dunnette, Sheri J.

    1994-01-01

    Providing visual information acquired from remote events to various operators, researchers, and practitioners has become progressively more important as the application of special skills in alien or hazardous situations increases. To provide an understanding of the technical parameters required to specify imagery, we have identified, defined, and discussed seven salient characteristics of images: spatial resolution, linearity, luminance resolution, spectral discrimination, temporal discrimination, edge definition, and signal-to-noise ratio. We then describe a generalizing imaging system and identified how various parts of the system affect the image data. To emphasize the different applications of imagery, we have constrasted the common television system with the significant parameters of a televisual imaging system for technical applications. Finally, we have established a method by which the required visual information can be specified by describing certain technical parameters which are directly related to the information content of the imagery. This method requires the user to complete a form listing all pertinent data requirements for the imagery.

  17. Intelligent Gateway design and development : final report

    DOT National Transportation Integrated Search

    1996-10-01

    The U.S. Coast Guard (USCG) had communications requirements uncommon to other services. Currently, there were no Defense Message System (DMS) products that could be used to send messages to underway vessels with multiple modes of communications. The ...

  18. Enhanced culvert inspections - best practices guidebook : final report.

    DOT National Transportation Integrated Search

    2017-06-01

    Culvert inspection is a key enabler that allows MnDOT to manage the states highway culvert system. When quantitative detail on culvert condition is required, an inspector will need to use enhanced inspection technologies. Enhanced inspection techn...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Santos, Rick; van Dam, Jeroen

    The objective of the test was to obtain a baseline characterization of the mechanical loads of the DOE 1.5 wind turbine located at NREL. The test was conducted in accordance with the International Electrotechnical Commission (IEC) Technical Specification, IEC 61400-13 Wind Turbine Generator Systems – Part 13: Measurement of mechanical loads; First Edition 2001-06 [1]. The National Wind Technology Center (NWTC) at NREL conducted this test in accordance with its quality system procedures so that the final test report meets the full requirements of its accreditation by the American Association for Laboratory Accreditation (A2LA). NREL’s quality system requires that allmore » applicable requirements specified by A2LA and International Standards Organization/IEC 17025 be met or to note any exceptions in the test report.« less

  20. Yakima/Klickitat Production Preliminary Design Report, Appendix C: Yakima and Klickitat Preliminary Engineering Reports.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    CH2M Hill; R.W. Beck and Associates.

    1990-03-01

    This chapter describes the biological and physical fish culture requirements of the hatchery system from which the concepts for the design are formulated. It includes a discussion of the program goals for fish production in the Yakima Basin followed by a brief summary of selected sites. The biological criteria are presented for the water system, adult holding, incubation, rearing, and finally transportation and release. The biological criteria address the water and space requirements, the number and type of vessels, and the related support requirements. To be assured that the components of the system meet all program demands, each life phasemore » from adult capture to the juvenile or smolt transfer into the acclimation sites is analyzed.« less

  1. Tritium glovebox stripper system seismic design evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Grinnell, J. J.; Klein, J. E.

    2015-09-01

    The use of glovebox confinement at US Department of Energy (DOE) tritium facilities has been discussed in numerous publications. Glovebox confinement protects the workers from radioactive material (especially tritium oxide), provides an inert atmosphere for prevention of flammable gas mixtures and deflagrations, and allows recovery of tritium released from the process into the glovebox when a glovebox stripper system (GBSS) is part of the design. Tritium recovery from the glovebox atmosphere reduces emissions from the facility and the radiological dose to the public. Location of US DOE defense programs facilities away from public boundaries also aids in reducing radiological dosesmore » to the public. This is a study based upon design concepts to identify issues and considerations for design of a Seismic GBSS. Safety requirements and analysis should be considered preliminary. Safety requirements for design of GBSS should be developed and finalized as a part of the final design process.« less

  2. The opto-mechanical design process: from vision to reality

    NASA Astrophysics Data System (ADS)

    Kvamme, E. Todd; Stubbs, David M.; Jacoby, Michael S.

    2017-08-01

    The design process for an opto-mechanical sub-system is discussed from requirements development through test. The process begins with a proper mission understanding and the development of requirements for the system. Preliminary design activities are then discussed with iterative analysis and design work being shared between the design, thermal, and structural engineering personnel. Readiness for preliminary review and the path to a final design review are considered. The value of prototyping and risk mitigation testing is examined with a focus on when it makes sense to execute a prototype test program. System level margin is discussed in general terms, and the practice of trading margin in one area of performance to meet another area is reviewed. Requirements verification and validation is briefly considered. Testing and its relationship to requirements verification concludes the design process.

  3. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 4. Saudi Engineering Solar Energy Applications System Design Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1985-01-01

    Literature summarizing a study on the Saudi Arabian solar controlled environment agriculture system is presented. Specifications and performance requirements for the system components are revealed. Detailed performance and cost analyses are used to determine the optimum design. A preliminary design of an engineering field test is included. Some weather data are provided for Riyadh, Saudi Arabia. (BCS)

  4. U.S. Army Student Detachment Student Handbook

    DTIC Science & Technology

    1991-06-06

    submit a thesis or do a major research project to meet graduation requirements, you must submit copies of the final product to the DTIC system to give...34 Identification Cards .......................................... 34 DEERS (Defense Eligibility Enrollment Report System ...USASD has access to a CONUS-wide telephone system . Therefore, no collect calls will be accepted. 4. If you do not have access to an AUTOVON, you may

  5. Facilitating the Education of the Visually Handicapped Through Research in Communications: 15 November 1972 - 30 April 1976. Final Report. Part Two: Indexes for Tape Recordings.

    ERIC Educational Resources Information Center

    Nolan, Carson Y., Ed.

    The second of a three-volume final report presents results of three studies on indexing systems for tape recordings used by blind persons. Study I is explained to have compared five tonal index codes in order to identify a code that required minimal display time, that had easily discriminable characters, and that could be easily learned. Results…

  6. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2018; Medicare Shared Savings Program Requirements; and Medicare Diabetes Prevention Program. Final rule.

    PubMed

    2017-11-15

    This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.

  7. SH-2F LAMPS Instructional Systems Development: Phase II. Final Report.

    ERIC Educational Resources Information Center

    Gibbons, Andrew S.; Hymes, Jonah P.

    This project was one of four aircrew training development projects in a continuing study of the methodology, effectiveness, and resource requirements of the Instructional Systems Development (ISD) process. This report covers the Phase II activities of a two-phase project for the development of aircrew training for SH-2F anti-submarine warfare…

  8. 78 FR 73197 - Agency Information Collection Activities; Submission for Office of Management and Budget Review...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-05

    ... Federal Register final rule that required all OTC drug products marketed under the OTC monograph system to... marketplace under new drug applications, abbreviated new drug applications, or an OTC drug monograph, except...

  9. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  10. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  11. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  12. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  13. 48 CFR 2936.516 - Quality surveys.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Quality surveys. 2936.516... REQUIREMENTS CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 2936.516 Quality surveys. The HCA... original and final surveys as prescribed in FAR 36.516. ...

  14. 77 FR 12286 - Final National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Heavy and Civil Engineering 237 Construction. EPA does not intend the preceding table to be exhaustive... challenged later in civil or criminal proceedings to enforce these requirements. In addition, this permit may...

  15. Automatic Extraction of Highway Traffic Data From Aerial Photographs

    DOT National Transportation Integrated Search

    1997-01-01

    This is the fifth and final report provided to fulfill the statutory requirement to periodically summarize the progress of the Intelligent Transportation Systems (ITS) program administered by the U.S. Department of Transportation (DOT). In the Transp...

  16. Unmanned surface vessel (USV) systems for bridge inspection : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    The use of unmanned surface vehicles (USVs) for bridge inspection has been explored. The following issues were considered: (1) the requirements of and : current techniques utilized in on-water bridge inspection; (2) USV design and configuration consi...

  17. An Ada implementation of the network manager for the advanced information processing system

    NASA Technical Reports Server (NTRS)

    Nagle, Gail A.

    1986-01-01

    From an implementation standpoint, the Ada language provided many features which facilitated the data and procedure abstraction process. The language supported a design which was dynamically flexible (despite strong typing), modular, and self-documenting. Adequate training of programmers requires access to an efficient compiler which supports full Ada. When the performance issues for real time processing are finally addressed by more stringent requirements for tasking features and the development of efficient run-time environments for embedded systems, the full power of the language will be realized.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Edgar, Thomas W.; Hadley, Mark D.; Manz, David O.

    This document provides the methods to secure routable control system communication in the electric sector. The approach of this document yields a long-term vision for a future of secure communication, while also providing near term steps and a roadmap. The requirements for the future secure control system environment were spelled out to provide a final target. Additionally a survey and evaluation of current protocols was used to determine if any existing technology could achieve this goal. In the end a four-step path was described that brought about increasing requirement completion and culminates in the realization of the long term vision.

  19. Automated payload experiment tool feasibility study

    NASA Technical Reports Server (NTRS)

    Maddux, Gary A.; Clark, James; Delugach, Harry; Hammons, Charles; Logan, Julie; Provancha, Anna

    1991-01-01

    To achieve an environment less dependent on the flow of paper, automated techniques of data storage and retrieval must be utilized. The prototype under development seeks to demonstrate the ability of a knowledge-based, hypertext computer system. This prototype is concerned with the logical links between two primary NASA support documents, the Science Requirements Document (SRD) and the Engineering Requirements Document (ERD). Once developed, the final system should have the ability to guide a principal investigator through the documentation process in a more timely and efficient manner, while supplying more accurate information to the NASA payload developer.

  20. Antenna pointing mechanism for ESA ENVISAT polar platform

    NASA Technical Reports Server (NTRS)

    Serrano, J.; SanMillan, J.; Santiago, R.

    1996-01-01

    INTA is currently developing a two-degree-of-freedom antenna pointing mechanism (APM) as part of the ESA ENVISAT POLAR PLATFORM (PPF) program. This mechanism will drive a Ka-band antenna within the Data-Relay Satellite System (DRS) on board the Polar Platform satellite. The first mission using PPF is ENVISAT, which is expected to be flown in 1998. This paper describes the main requirements, design, and test results of this pointing system, as well as the main technical problems from customer requirements and how those have been faced to achieve a final design.

  1. Automated processing of whole blood units: operational value and in vitro quality of final blood components

    PubMed Central

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    Background The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Materials and methods Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. Results The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. Discussion These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement. PMID:22044958

  2. Automated processing of whole blood units: operational value and in vitro quality of final blood components.

    PubMed

    Jurado, Marisa; Algora, Manuel; Garcia-Sanchez, Félix; Vico, Santiago; Rodriguez, Eva; Perez, Sonia; Barbolla, Luz

    2012-01-01

    The Community Transfusion Centre in Madrid currently processes whole blood using a conventional procedure (Compomat, Fresenius) followed by automated processing of buffy coats with the OrbiSac system (CaridianBCT). The Atreus 3C system (CaridianBCT) automates the production of red blood cells, plasma and an interim platelet unit from a whole blood unit. Interim platelet unit are pooled to produce a transfusable platelet unit. In this study the Atreus 3C system was evaluated and compared to the routine method with regards to product quality and operational value. Over a 5-week period 810 whole blood units were processed using the Atreus 3C system. The attributes of the automated process were compared to those of the routine method by assessing productivity, space, equipment and staffing requirements. The data obtained were evaluated in order to estimate the impact of implementing the Atreus 3C system in the routine setting of the blood centre. Yield and in vitro quality of the final blood components processed with the two systems were evaluated and compared. The Atreus 3C system enabled higher throughput while requiring less space and employee time by decreasing the amount of equipment and processing time per unit of whole blood processed. Whole blood units processed on the Atreus 3C system gave a higher platelet yield, a similar amount of red blood cells and a smaller volume of plasma. These results support the conclusion that the Atreus 3C system produces blood components meeting quality requirements while providing a high operational efficiency. Implementation of the Atreus 3C system could result in a large organisational improvement.

  3. Improved Controls for Fusion RF Systems. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Casey, Jeffrey A.

    2011-11-08

    We have addressed the specific requirements for the integrated systems controlling an array of klystrons used for Lower Hybrid Current Drive (LHCD). The immediate goal for our design was to modernize the transmitter protection system (TPS) for LHCD on the Alcator C-Mod tokamak at the MIT Plasma Science and Fusion Center (MIT-PSFC). Working with the Alcator C-Mod team, we have upgraded the design of these controls to retrofit for improvements in performance and safety, as well as to facilitate the upcoming expansion from 12 to 16 klystrons. The longer range goals to generalize the designs in such a way thatmore » they will be of benefit to other programs within the international fusion effort was met by designing a system which was flexible enough to address all the MIT system requirements, and modular enough to adapt to a large variety of other requirements with minimal reconfiguration.« less

  4. A Novel Design of an Automatic Lighting Control System for a Wireless Sensor Network with Increased Sensor Lifetime and Reduced Sensor Numbers

    PubMed Central

    Mohamaddoust, Reza; Haghighat, Abolfazl Toroghi; Sharif, Mohamad Javad Motahari; Capanni, Niccolo

    2011-01-01

    Wireless sensor networks (WSN) are currently being applied to energy conservation applications such as light control. We propose a design for such a system called a Lighting Automatic Control System (LACS). The LACS system contains a centralized or distributed architecture determined by application requirements and space usage. The system optimizes the calculations and communications for lighting intensity, incorporates user illumination requirements according to their activities and performs adjustments based on external lighting effects in external sensor and external sensor-less architectures. Methods are proposed for reducing the number of sensors required and increasing the lifetime of those used, for considerably reduced energy consumption. Additionally we suggest methods for improving uniformity of illuminance distribution on a workplane’s surface, which improves user satisfaction. Finally simulation results are presented to verify the effectiveness of our design. PMID:22164114

  5. A novel design of an automatic lighting control system for a wireless sensor network with increased sensor lifetime and reduced sensor numbers.

    PubMed

    Mohamaddoust, Reza; Haghighat, Abolfazl Toroghi; Sharif, Mohamad Javad Motahari; Capanni, Niccolo

    2011-01-01

    Wireless sensor networks (WSN) are currently being applied to energy conservation applications such as light control. We propose a design for such a system called a lighting automatic control system (LACS). The LACS system contains a centralized or distributed architecture determined by application requirements and space usage. The system optimizes the calculations and communications for lighting intensity, incorporates user illumination requirements according to their activities and performs adjustments based on external lighting effects in external sensor and external sensor-less architectures. Methods are proposed for reducing the number of sensors required and increasing the lifetime of those used, for considerably reduced energy consumption. Additionally we suggest methods for improving uniformity of illuminance distribution on a workplane's surface, which improves user satisfaction. Finally simulation results are presented to verify the effectiveness of our design.

  6. Current good manufacturing practice in manufacturing, processing, packing, or holding of drugs; revision of certain labeling controls--FDA. Final rule.

    PubMed

    1993-08-03

    The Food and Drug Administration (FDA) is amending the current good manufacturing practice (CGMP) regulations for human and veterinary drug products to revise certain labeling control provisions. Specifically, the final rule defines the term "gang-printed labeling," specifies conditions for the use of gang-printed or cut labeling, exempts manufacturers that employ automated 100-percent labeling inspection systems from CGMP labeling reconciliation requirements, and requires manufacturers to identify filled drug product containers that are set aside and held in an unlabeled condition for future labeling operations. These changes are intended to reduce the frequency of drug product mislabeling and associated drug product recalls.

  7. Thermal management and mechanical structures for silicon detector systems

    NASA Astrophysics Data System (ADS)

    Viehhauser, G.

    2015-09-01

    Due to the size of current silicon tracking systems system aspects have become a major design driver. This article discusses requirements for the engineering of the mechanical structures and thermal management of such systems and reviews solutions developed to satisfy them. Modern materials and fabrication techniques have been instrumental in constructing these devices and will be discussed here. Finally, this paper will describe current and potential future developments in the engineering of silicon tracking systems which will shape the silicon tracking systems of the future.

  8. A MYSQL-BASED DATA ARCHIVER: PRELIMINARY RESULTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthew Bickley; Christopher Slominski

    2008-01-23

    Following an evaluation of the archival requirements of the Jefferson Laboratory accelerator’s user community, a prototyping effort was executed to determine if an archiver based on MySQL had sufficient functionality to meet those requirements. This approach was chosen because an archiver based on a relational database enables the development effort to focus on data acquisition and management, letting the database take care of storage, indexing and data consistency. It was clear from the prototype effort that there were no performance impediments to successful implementation of a final system. With our performance concerns addressed, the lab undertook the design and developmentmore » of an operational system. The system is in its operational testing phase now. This paper discusses the archiver system requirements, some of the design choices and their rationale, and presents the acquisition, storage and retrieval performance.« less

  9. Optimization in the systems engineering process

    NASA Technical Reports Server (NTRS)

    Lemmerman, Loren A.

    1993-01-01

    The essential elements of the design process consist of the mission definition phase that provides the system requirements, the conceptual design, the preliminary design and finally the detailed design. Mission definition is performed largely by operations analysts in conjunction with the customer. The result of their study is handed off to the systems engineers for documentation as the systems requirements. The document that provides these requirements is the basis for the further design work of the design engineers at the Lockheed-Georgia Company. The design phase actually begins with conceptual design, which is generally conducted by a small group of engineers using multidisciplinary design programs. Because of the complexity of the design problem, the analyses are relatively simple and generally dependent on parametric analyses of the configuration. The result of this phase is a baseline configuration from which preliminary design may be initiated.

  10. Data compression for full motion video transmission

    NASA Technical Reports Server (NTRS)

    Whyte, Wayne A., Jr.; Sayood, Khalid

    1991-01-01

    Clearly transmission of visual information will be a major, if not dominant, factor in determining the requirements for, and assessing the performance of the Space Exploration Initiative (SEI) communications systems. Projected image/video requirements which are currently anticipated for SEI mission scenarios are presented. Based on this information and projected link performance figures, the image/video data compression requirements which would allow link closure are identified. Finally several approaches which could satisfy some of the compression requirements are presented and possible future approaches which show promise for more substantial compression performance improvement are discussed.

  11. Natural Resource Information System. Volume 1: Overall description

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A prototype computer-based Natural Resource Information System was designed which could store, process, and display data of maximum usefulness to land management decision making. The system includes graphic input and display, the use of remote sensing as a data source, and it is useful at multiple management levels. A survey established current decision making processes and functions, information requirements, and data collection and processing procedures. The applications of remote sensing data and processing requirements were established. Processing software was constructed and a data base established using high-altitude imagery and map coverage of selected areas of SE Arizona. Finally a demonstration of system processing functions was conducted utilizing material from the data base.

  12. 78 FR 47859 - Medicare Program; Inpatient Rehabilitation Facility Prospective Payment System for Federal Fiscal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ...This final rule updates the prospective payment rates for inpatient rehabilitation facilities (IRFs) for federal fiscal year (FY) 2014 (for discharges occurring on or after October 1, 2013 and on or before September 30, 2014) as required by the statute. This final rule also revised the list of diagnosis codes that may be counted toward an IRF's ``60 percent rule'' compliance calculation to determine ``presumptive compliance,'' update the IRF facility-level adjustment factors using an enhanced estimation methodology, revise sections of the Inpatient Rehabilitation Facility-Patient Assessment Instrument, revise requirements for acute care hospitals that have IRF units, clarify the IRF regulation text regarding limitation of review, update references to previously changed sections in the regulations text, and revise and update quality measures and reporting requirements under the IRF quality reporting program.

  13. Problem reporting and tracking system: a systems engineering challenge

    NASA Astrophysics Data System (ADS)

    Cortez, Vasco; Lopez, Bernhard; Whyborn, Nicholas; Price, Roberto; Hernandez, Octavio; Gairing, Stefan; Barrios, Emilio; Alarcon, Hector

    2016-08-01

    The problem reporting and tracking system (PRTS) is the ALMA system to register operational problems, track unplanned corrective operational maintenance activities and follow the investigations of all problems or possible issues arisen in operation activities. After the PRTS implementation appeared several issues that finally produced a lack in the management of the investigations, problems to produce KPIs, loss of information, among others. In order to improve PRTS, we carried out a process to review the status of system, define a set of modifications and implement a solution; all according to the stakeholder requirements. In this work, we shall present the methodology applied to define a set of concrete actions at the basis of understanding the complexity of the problem, which finally got to improve the interactions between different subsystems and enhance the communication at different levels.

  14. Design requirements and development of an airborne descent path definition algorithm for time navigation

    NASA Technical Reports Server (NTRS)

    Izumi, K. H.; Thompson, J. L.; Groce, J. L.; Schwab, R. W.

    1986-01-01

    The design requirements for a 4D path definition algorithm are described. These requirements were developed for the NASA ATOPS as an extension of the Local Flow Management/Profile Descent algorithm. They specify the processing flow, functional and data architectures, and system input requirements, and recommended the addition of a broad path revision (reinitialization) function capability. The document also summarizes algorithm design enhancements and the implementation status of the algorithm on an in-house PDP-11/70 computer. Finally, the requirements for the pilot-computer interfaces, the lateral path processor, and guidance and steering function are described.

  15. A continuous dry 300 mK cooler for THz sensing applications.

    PubMed

    Klemencic, G M; Ade, P A R; Chase, S; Sudiwala, R; Woodcraft, A L

    2016-04-01

    We describe and demonstrate the automated operation of a novel cryostat design that is capable of maintaining an unloaded base temperature of less than 300 mK continuously, without the need to recycle the gases within the final cold head, as is the case for conventional single shot sorption pumped (3)He cooling systems. This closed dry system uses only 5 l of (3)He gas, making this an economical alternative to traditional systems where a long hold time is required. During testing, a temperature of 365 mK was maintained with a constant 20 μW load, simulating the cooling requirement of a far infrared camera.

  16. Design criteria and candidate electrical power systems for a reusable Space Shuttle booster.

    NASA Technical Reports Server (NTRS)

    Merrifield, D. V.

    1972-01-01

    This paper presents the results of a preliminary study to establish electrical power requirements, investigate candidate power sources, and select a representative power generation concept for the NASA Space Shuttle booster stage. Design guidelines and system performance requirements are established. Candidate power sources and combinations thereof are defined and weight estimates made. The selected power source concept utilizes secondary silver-zinc batteries, engine-driven alternators with constant speed drive, and an airbreathing gas turbine. The need for cost optimization, within safety, reliability, and performance constraints, is emphasized as being the most important criteria in design of the final system.

  17. Energy Efficient Engine Flight Propulsion System Preliminary Analysis and Design Report

    NASA Technical Reports Server (NTRS)

    Bisset, J. W.; Howe, D. C.

    1983-01-01

    The final design and analysis of the flight propulsion system is presented. This system is the conceptual study engine defined to meet the performance, economic and environmental goals established for the Energy Efficient Engine Program. The design effort included a final definition of the engine, major components, internal subsystems, and nacelle. Various analytical representations and results from component technology programs are used to verify aerodynamic and structural design concepts and to predict performance. Specific design goals and specifications, reflecting future commercial aircraft propulsion system requirements for the mid-1980's, are detailed by NASA and used as guidelines during engine definition. Information is also included which details salient results from a separate study to define a turbofan propulsion system, known as the maximum efficiency engine, which reoptimized the advanced fuel saving technologies for improved fuel economy and direct operating costs relative to the flight propulsion system.

  18. Nuclear thermal propulsion transportation systems for lunar/Mars exploration

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Borowski, Stanley K.; Mcilwain, Melvin C.; Pellaccio, Dennis G.

    1992-01-01

    Nuclear thermal propulsion technology development is underway at NASA and DoE for Space Exploration Initiative (SEI) missions to Mars, with initial near-earth flights to validate flight readiness. Several reactor concepts are being considered for these missions, and important selection criteria will be evaluated before final selection of a system. These criteria include: safety and reliability, technical risk, cost, and performance, in that order. Of the concepts evaluated to date, the Nuclear Engine for Rocket Vehicle Applications (NERVA) derivative (NDR) is the only concept that has demonstrated full power, life, and performance in actual reactor tests. Other concepts will require significant design work and must demonstrate proof-of-concept. Technical risk, and hence, development cost should therefore be lowest for the concept, and the NDR concept is currently being considered for the initial SEI missions. As lighter weight, higher performance systems are developed and validated, including appropriate safety and astronaut-rating requirements, they will be considered to support future SEI application. A space transportation system using a modular nuclear thermal rocket (NTR) system for lunar and Mars missions is expected to result in significant life cycle cost savings. Finally, several key issues remain for NTR's, including public acceptance and operational issues. Nonetheless, NTR's are believed to be the 'next generation' of space propulsion systems - the key to space exploration.

  19. A Vision in Jeopardy: Royal Navy Maritime Autonomous Systems (MAS)

    DTIC Science & Technology

    2017-03-31

    Chapter 6 will propose a new MAS vision for the RN. However, before doing so, a fresh look at the problem is required. Consensus of the Problem, Not the... assessment , the RN has failed to deliver any sustainable MAS operational capability. A vision for MAS finally materialized in 2014. Yet, the vision...continuous investment and assessment , the RN has failed to deliver any sustainable MAS operational capability. A vision for MAS finally materialized in

  20. Progress in high-dose radiation dosimetry. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ettinger, K.V.; Nam, J.W.; McLaughlin, W.L.

    1981-01-01

    The last decade has witnessed a deluge of new high-dose dosimetry techniques and expended applications of methods developed earlier. Many of the principal systems are calibrated by means of calorimetry, although production of heat is not always the final radiation effect of interest. Requirements for a stable and reliable transfer dose meters have led to further developments of several important high-dose systems: thermoluminescent materials, radiochromic dyes, ceric-cerous solutions analyzed by high-frequency oscillometry. A number of other prospective dosimeters are also treated in this review. In addition, an IAEA program of high-dose intercomparison and standardization for industrial radiation processing is described.

  1. Progress in high-dose radiation dosimetry. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ettinger, K.V.; Nam, J.W.; McLaughlin, W.L.

    1981-01-01

    The last decade has witnessed a deluge of new high-dose dosimetry techniques and expended applications of methods developed earlier. Many of the principal systems are calibrated by means of calorimetry, although production of heat is not always the final radiation effect of interest. Requirements for a stable and reliable transfer dose meters have led to further developments of several important high-dose systems: thermoluminescent materials, radiochromic dyes, ceric-cerous solutions analyzed by high-frequency oscillometry. A number of other prospective dosimeters also treated in this review. In addition, an IAEA programme of high-dose intercomparison and standardization for industrial radiation processing is described.

  2. Combination of an electrolytic pretreatment unit with secondary water reclamation processes

    NASA Technical Reports Server (NTRS)

    Wells, G. W.; Bonura, M. S.

    1973-01-01

    The design and fabrication of a flight concept prototype electrolytic pretreatment unit (EPU) and of a contractor-furnished air evaporation unit (AEU) are described. The integrated EPU and AEU potable water recovery system is referred to as the Electrovap and is capable of processing the urine and flush water of a six-man crew. Results of a five-day performance verification test of the Electrovap system are presented and plans are included for the extended testing of the Electrovap to produce data applicable to the combination of electrolytic pretreatment with most final potable water recovery systems. Plans are also presented for a program to define the design requirements for combining the electrolytic pretreatment unit with a reverse osmosis final processing unit.

  3. Final Report Program Plan for Search and Rescue Electronics Alerting and Locating System

    DOT National Transportation Integrated Search

    1974-02-01

    This study investigates the requirements that exist for electronic devices for alerting and locating distress incidents and presents a plan for acquiring an adequate capability. Data are provided that bound the problem. Possible alternatives are exam...

  4. Improving striping operations through system optimization - phase 2 : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    Striping operations generate a significant workload for MoDOT maintenance operations. The requirement for each striping crew : to replenish its stock of paint and other consumable items from a bulk storage facility, along with the necessity to make s...

  5. 48 CFR 1830.7001-4 - Postaward FCCOM applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION... cost of money factors are finalized, use the new factors to calculate FCCOM for the next accounting... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Postaward FCCOM...

  6. A high school is supplied with solar energy--Dallas, Texas

    NASA Technical Reports Server (NTRS)

    1981-01-01

    System preheats 100 percent of domestic hot water and supplies almost half of heating requirements for three story, concrete frame, brick building with basement. Final report includes details of installation, operation and maintenance, contract negotiation, and acceptance test plan.

  7. New asphalt mix design system for Oklahoma department of transportation : final report.

    DOT National Transportation Integrated Search

    2013-03-01

    Oklahoma Department of Transportation (ODOT) has been using the Superpave mix design software for several years. The original Superpave mix design software was built around Fox Database and did not meet ODOT requirements. The software currently being...

  8. High speed bus technology development

    NASA Astrophysics Data System (ADS)

    Modrow, Marlan B.; Hatfield, Donald W.

    1989-09-01

    The development and demonstration of the High Speed Data Bus system, a 50 Million bits per second (Mbps) local data network intended for avionics applications in advanced military aircraft is described. The Advanced System Avionics (ASA)/PAVE PILLAR program provided the avionics architecture concept and basic requirements. Designs for wire and fiber optic media were produced and hardware demonstrations were performed. An efficient, robust token-passing protocol was developed and partially demonstrated. The requirements specifications, the trade-offs made, and the resulting designs for both a coaxial wire media system and a fiber optics design are examined. Also, the development of a message-oriented media access protocol is described, from requirements definition through analysis, simulation and experimentation. Finally, the testing and demonstrations conducted on the breadboard and brassboard hardware is presented.

  9. A Formal Approach to Requirements-Based Programming

    NASA Technical Reports Server (NTRS)

    Hinchey, Michael G.; Rash, James L.; Rouff, Christopher A.

    2005-01-01

    No significant general-purpose method is currently available to mechanically transform system requirements into a provably equivalent model. The widespread use of such a method represents a necessary step toward high-dependability system engineering for numerous application domains. Current tools and methods that start with a formal model of a system and mechanically produce a provably equivalent implementation are valuable but not sufficient. The "gap" unfilled by such tools and methods is that the formal models cannot be proven to be equivalent to the requirements. We offer a method for mechanically transforming requirements into a provably equivalent formal model that can be used as the basis for code generation and other transformations. This method is unique in offering full mathematical tractability while using notations and techniques that are well known and well trusted. Finally, we describe further application areas we are investigating for use of the approach.

  10. Mass spectrometry in systems biology an introduction.

    PubMed

    Dunn, Warwick B

    2011-01-01

    The qualitative detection, quantification, and structural characterization of analytes in biological systems are important requirements for objectives to be fulfilled in systems biology research. One analytical tool applied to a multitude of systems biology studies is mass spectrometry, particularly for the study of proteins and metabolites. Here, the role of mass spectrometry in systems biology will be assessed, the advantages and disadvantages discussed, and the instrument configurations available described. Finally, general applications will be briefly reviewed. Copyright © 2011 Elsevier Inc. All rights reserved.

  11. Status of 20 kHz space station power distribution technology

    NASA Technical Reports Server (NTRS)

    Hansen, Irving G.

    1988-01-01

    Power Distribution on the NASA Space Station will be accomplished by a 20 kHz sinusoidal, 440 VRMS, single phase system. In order to minimize both system complexity and the total power coversion steps required, high frequency power will be distributed end-to-end in the system. To support the final design of flight power system hardware, advanced development and demonstrations have been made on key system technologies and components. The current status of this program is discussed.

  12. Application of the SCADA system in wastewater treatment plants.

    PubMed

    Dieu, B

    2001-01-01

    The implementation of the SCADA system has a positive impact on the operations, maintenance, process improvement and savings for the City of Houston's Wastewater Operations branch. This paper will discuss the system's evolvement, the external/internal architecture, and the human-machine-interface graphical design. Finally, it will demonstrate the system's successes in monitoring the City's sewage and sludge collection/distribution systems, wet-weather facilities and wastewater treatment plants, complying with the USEPA requirements on the discharge, and effectively reducing the operations and maintenance costs.

  13. Collisional breakup in a quantum system of three charged particles

    PubMed

    Rescigno; Baertschy; Isaacs; McCurdy

    1999-12-24

    Since the invention of quantum mechanics, even the simplest example of the collisional breakup of a system of charged particles, e(-) + H --> H(+) + e(-) + e(-) (where e(-) is an electron and H is hydrogen), has resisted solution and is now one of the last unsolved fundamental problems in atomic physics. A complete solution requires calculation of the energies and directions for a final state in which all three particles are moving away from each other. Even with supercomputers, the correct mathematical description of this state has proved difficult to apply. A framework for solving ionization problems in many areas of chemistry and physics is finally provided by a mathematical transformation of the Schrodinger equation that makes the final state tractable, providing the key to a numerical solution of this problem that reveals its full dynamics.

  14. Design of a recumbent seating system

    NASA Technical Reports Server (NTRS)

    Croyle, Scott; Delarosa, Jose; George, Daren; Hinkle, Cathy; Karas, Stephen

    1993-01-01

    Future space shuttle missions presented by NASA might require the shuttle to rendezvous with the Russian space station Mir for the purpose of transporting astronauts back to earth. Due to the atrophied state of these astronauts, a special seating system must be designed for their transportation. The main functions of this seating system are to support and restrain the astronauts during normal reentry flight and to dampen some of the loading that might occur in a crash situation. Through research, the design team developed many concept variants for these functional requirements. By evaluating each variant, the concepts were eliminated until the four most attractive designs remained. The team used a decision matrix to determine the best concept to carry through embodiment. This concept involved using struts for support during reentry flight and a spring damper/shock absorber system to dampen crash landing loads. The embodiment design process consisted of defining the layout of each of the main functional components, specifically, the seat structure and the strut structure. Through the use of MCS/pal two, the design was refined until it could handle all required loads and dampen to the forces specified. The auxiliary function carriers were then considered. Following the design of these components, the complete final layout could be determined. It is concluded that the final design meets all specifications outlined in the conceptual design. The main advantages of this design are its low weight, simplicity, and large amount of function sharing between different components. The disassembly of this design could potentially present a problem because of time and size constraints involved. Overall, this design meets or exceeds all functional requirements.

  15. DoD Can Save Millions by Using Energy Efficient Centralized Aircraft Support Systems.

    DTIC Science & Technology

    1982-05-07

    recommends that the Secretary of the Air Force: -- Reevaluate the decision not to install centralized systems at tactical bases. If the systems can be...discontinue using the aircraft’s onboard auxillary power units. These units consume tremendous amounts of jet fuel in providing cabin air-conditioning...requirements. Each command has been asked to analyze its bases to determine if centralized systems should be installed. Although a final decision has not

  16. INO340 telescope control system: middleware requirements, design, and evaluation

    NASA Astrophysics Data System (ADS)

    Shalchian, Hengameh; Ravanmehr, Reza

    2016-07-01

    The INO340 Control System (INOCS) is being designed in terms of a distributed real-time architecture. The real-time (soft and firm) nature of many processes inside INOCS causes the communication paradigm between its different components to be time-critical and sensitive. For this purpose, we have chosen the Data Distribution Service (DDS) standard as the communications middleware which is itself based on the publish-subscribe paradigm. In this paper, we review and compare the main middleware types, and then we illustrate the middleware architecture of INOCS and its specific requirements. Finally, we present the experimental results, performed to evaluate our middleware in order to ensure that it meets our requirements.

  17. Experimentation and evaluation of advanced integrated system concepts

    NASA Astrophysics Data System (ADS)

    Ross, M.; Garrigus, K.; Gottschalck, J.; Rinearson, L.; Longee, E.

    1980-09-01

    This final report examines the implementation of a time-phased test bed for experimentation and evaluation of advanced system concepts relative to the future Defense Switched Network (DSN). After identifying issues pertinent to the DSN, a set of experiments which address these issues are developed. Experiments are ordered based on their immediacy and relative importance to DSN development. The set of experiments thus defined allows requirements for a time phased implementation of a test bed to be identified, and several generic test bed architectures which meet these requirements are examined. Specific architecture implementations are costed and cost/schedule profiles are generated as a function of experimental capability. The final recommended system consists of two separate test beds: a circuit switch test bed, configured around an off-the-shelf commercial switch, and directed toward the examination of nearer term and transitional issues raised by the evolving DSN; and a packet/hybrid test bed, featuring a discrete buildup of new hardware and software modules, and directed toward examination of the more advanced integrated voice and data telecommunications issues and concepts.

  18. El Toro Library Solar Heating and Cooling Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less

  19. Hypersonic Research Vehicle (HRV) real-time flight test support feasibility and requirements study. Part 2: Remote computation support for flight systems functions

    NASA Technical Reports Server (NTRS)

    Rediess, Herman A.; Hewett, M. D.

    1991-01-01

    The requirements are assessed for the use of remote computation to support HRV flight testing. First, remote computational requirements were developed to support functions that will eventually be performed onboard operational vehicles of this type. These functions which either cannot be performed onboard in the time frame of initial HRV flight test programs because the technology of airborne computers will not be sufficiently advanced to support the computational loads required, or it is not desirable to perform the functions onboard in the flight test program for other reasons. Second, remote computational support either required or highly desirable to conduct flight testing itself was addressed. The use is proposed of an Automated Flight Management System which is described in conceptual detail. Third, autonomous operations is discussed and finally, unmanned operations.

  20. Inter-Satellite Communications Considerations and Requirements for Distributed Spacecraft and Formation Flying Systems

    NASA Technical Reports Server (NTRS)

    Kwadrat, Carl F.; Horne, William D.; Edwards, Bernard L.

    2002-01-01

    In order to avoid selecting inadequate inter-spacecraft cross-link communications standards for Distributed Spacecraft System (DSS) missions, it is first necessary to identify cross-link communications strategies and requirements common to a cross-section of proposed missions. This paper addresses the cross-link communication strategies and requirements derived from a survey of 39 DSS mission descriptions that are projected for potential launch within the next 20 years. The inter-spacecraft communications strategies presented are derived from the topological and communications constraints from the DSS missions surveyed. Basic functional requirements are derived from an analysis of the fundamental activities that must be undertaken to establish and maintain a cross-link between two DSS spacecraft. Cross-link bandwidth requirements are derived from high-level assessments of mission science objectives and operations concepts. Finally, a preliminary assessment of possible cross-link standards is presented within the context of the basic operational and interoperability requirements.

  1. Initial SVS Integrated Technology Evaluation Flight Test Requirements and Hardware Architecture

    NASA Technical Reports Server (NTRS)

    Harrison, Stella V.; Kramer, Lynda J.; Bailey, Randall E.; Jones, Denise R.; Young, Steven D.; Harrah, Steven D.; Arthur, Jarvis J.; Parrish, Russell V.

    2003-01-01

    This document presents the flight test requirements for the Initial Synthetic Vision Systems Integrated Technology Evaluation flight Test to be flown aboard NASA Langley's ARIES aircraft and the final hardware architecture implemented to meet these requirements. Part I of this document contains the hardware, software, simulator, and flight operations requirements for this light test as they were defined in August 2002. The contents of this section are the actual requirements document that was signed for this flight test. Part II of this document contains information pertaining to the hardware architecture that was realized to meet these requirements as presented to and approved by a Critical Design Review Panel prior to installation on the B-757 Airborne Research Integrated Experiments Systems (ARIES) airplane. This information includes a description of the equipment, block diagrams of the architecture, layouts of the workstations, and pictures of the actual installations.

  2. The Wide-area Energy Management System Phase 2 Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lu, Ning; Makarov, Yuri V.; Weimar, Mark R.

    2010-08-31

    The higher penetration of intermittent generation resources (including wind and solar generation) in the Bonneville Power Administration (BPA) and California Independent System Operator (CAISO) balancing authorities (BAs) raises issue of requiring expensive additional fast grid balancing services in response to additional intermittency and fast up and down power ramps in the electric supply system. The overall goal of the wide-area energy management system (WAEMS) project is to develop the principles, algorithms, market integration rules, a functional design, and a technical specification for an energy storage system to help cope with unexpected rapid changes in renewable generation power output. The resultingmore » system will store excess energy, control dispatchable load and distributed generation, and utilize inter-area exchange of the excess energy between the California ISO and Bonneville Power Administration control areas. A further goal is to provide a cost-benefit analysis and develop a business model for an investment-based practical deployment of such a system. There are two tasks in Phase 2 of the WAEMS project: the flywheel field tests and the battery evaluation. Two final reports, the Wide-area Energy Management System Phase 2 Flywheel Field Tests Final Report and the Wide-area Energy Storage and Management System Battery Storage Evaluation, were written to summarize the results of the two tasks.« less

  3. 40 CFR Appendix P to Subpart G of... - Substitutes Listed in the September 27, 2006 Final Rule, Effective November 27, 2006

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... latest edition of the NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems, for whichever... requirements. 4—The agent should be recovered from the fire protection system in conjunction with testing or... coverage related to the use of personal protective equipment (e.g., respiratory protection), fire...

  4. 40 CFR Appendix P to Subpart G of... - Substitutes Listed in the September 27, 2006 Final Rule, Effective November 27, 2006

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... latest edition of the NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems, for whichever... requirements. 4—The agent should be recovered from the fire protection system in conjunction with testing or... coverage related to the use of personal protective equipment (e.g., respiratory protection), fire...

  5. 40 CFR Appendix P to Subpart G of... - Substitutes Listed in the September 27, 2006 Final Rule, Effective November 27, 2006

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... latest edition of the NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems, for whichever... requirements. 4—The agent should be recovered from the fire protection system in conjunction with testing or... coverage related to the use of personal protective equipment (e.g., respiratory protection), fire...

  6. Air Force Global Weather Central System Architecture Study. Final System/Subsystem Summary Report. Volume 2. Requirements Compilation and Analysis. Part 3. Characteristics Summaries and Network Analysis

    DTIC Science & Technology

    1976-03-01

    DB DC DCT DDB DET DF DFS DML DMS DMSP DOD DS DSARC DT EDB EDS EG ESSA ETAC EWO Control and Reporting Post Cathode Ray Tube...National and Aviation Meteorological Facsimile Network NC - Network Control NCA - National Command Authority NCAR - National Center for Atmospheric

  7. Future of computerised electrocardiography.

    PubMed Central

    Meijler, F L; Robles de Medina, E O; Helder, J C

    1980-01-01

    The advent of computerised electrocardiography has been of prime importance for the storage and retrieval of data, but none of the available systems is of universal application for analysis of patterns. Future needs require hierarchical systems of increasing degrees of complexity, depending on the source of requests, and there should be appropriate provision for review by cardiologists before the final report is issued. PMID:7000098

  8. Equity Implications of Methods of Funding State Teachers' Retirement Systems. Working Paper in Education Finance No. 30.

    ERIC Educational Resources Information Center

    Wendling, Wayne

    Current methods of funding teachers' retirement systems, which base pensions on final salaries, are inequitable because they are not related to school districts' ability to pay and because they require some teachers to subsidize others. A five-state survey shows it is common for pensions to be funded by school districts and teachers, sometimes…

  9. Space shuttle avionics system

    NASA Technical Reports Server (NTRS)

    Hanaway, John F.; Moorehead, Robert W.

    1989-01-01

    The Space Shuttle avionics system, which was conceived in the early 1970's and became operational in the 1980's represents a significant advancement of avionics system technology in the areas of systems and redundacy management, digital data base technology, flight software, flight control integration, digital fly-by-wire technology, crew display interface, and operational concepts. The origins and the evolution of the system are traced; the requirements, the constraints, and other factors which led to the final configuration are outlined; and the functional operation of the system is described. An overall system block diagram is included.

  10. Concrete pavement quality control testing requirements needed for the super air meter : final report.

    DOT National Transportation Integrated Search

    2016-10-01

    Concrete freeze-thaw durability is prominently linked to the air void system within the concrete. : Concrete pavements in Kansas undergo repetitive freeze-thaw cycles. Total air content measurements : currently used on fresh concrete do not provide a...

  11. 48 CFR 9905.505-50 - Techniques for application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... this cost accounting principle does not require that allocation of unallowable costs to final cost.... 9905.505-50 Section 9905.505-50 Federal Acquisition Regulations System COST ACCOUNTING STANDARDS BOARD... ACCOUNTING STANDARDS COST ACCOUNTING STANDARDS FOR EDUCATIONAL INSTITUTIONS 9905.505-50 Techniques for...

  12. Global Petroleum Corporation (MA0003425) | NPDES | New ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  13. Chelsea Sandwich, LLC (MA0003280) | Chelsea Creek ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  14. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  15. Essential use cases for pedagogical patterns

    NASA Astrophysics Data System (ADS)

    Derntl, Michael; Botturi, Luca

    2006-06-01

    Coming from architecture, through computer science, pattern-based design spread into other disciplines and is nowadays recognized as a powerful way of capturing and reusing effective design practice. However, current pedagogical pattern approaches lack widespread adoption, both by users and authors, and are still limited to individual initiatives. This paper contributes to creating a shared understanding of what a pattern system is by defining the key terms. Moreover, the paper builds upon and extends a set of existing functional and non-functional requirements for pattern systems, adds structure to these requirements, and derives essential use cases following a goal-based approach for both pattern maintenance and pattern application. Finally, implications concerning the pedagogical use of pattern-based design are drawn, concluding that a stronger focus on the underlying (pedagogical) value system is required in order to make a pattern system a meaningful tool for effective educational design.

  16. Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

    NASA Technical Reports Server (NTRS)

    Bickford, R. L.; Collamore, F. N.; Gage, M. L.; Morgan, D. B.; Thomas, E. R.

    1992-01-01

    The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'.

  17. Spacecraft design project: Low Earth orbit communications satellite

    NASA Technical Reports Server (NTRS)

    Moroney, Dave; Lashbrook, Dave; Mckibben, Barry; Gardener, Nigel; Rivers, Thane; Nottingham, Greg; Golden, Bill; Barfield, Bill; Bruening, Joe; Wood, Dave

    1991-01-01

    This is the final product of the spacecraft design project completed to fulfill the academic requirements of the Spacecraft Design and Integration 2 course (AE-4871) taught at the U.S. Naval Postgraduate School. The Spacecraft Design and Integration 2 course is intended to provide students detailed design experience in selection and design of both satellite system and subsystem components, and their location and integration into a final spacecraft configuration. The design team pursued a design to support a Low Earth Orbiting (LEO) communications system (GLOBALSTAR) currently under development by the Loral Cellular Systems Corporation. Each of the 14 team members was assigned both primary and secondary duties in program management or system design. Hardware selection, spacecraft component design, analysis, and integration were accomplished within the constraints imposed by the 11 week academic schedule and the available design facilities.

  18. Solar thermal repowering systems integration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dubberly, L. J.; Gormely, J. E.; McKenzie, A. W.

    1979-08-01

    This report is a solar repowering integration analysis which defines the balance-of-plant characteristics and costs associated with the solar thermal repowering of existing gas/oil-fired electric generating plants. Solar repowering interface requirements for water/steam and salt or sodium-cooled central receivers are defined for unit sizes ranging from 50 MWe non-reheat to 350 MWe reheat. Finally balance-of-plant cost estimates are presented for each of six combinations of plant type, receiver type and percent solar repowering.

  19. New Approaches to Final Cooling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neuffer, David

    2014-11-10

    A high-energy muon collider scenario require a “final cooling” system that reduces transverse emittances by a factor of ~10 while allowing longitudinal emittance increase. The baseline approach has low-energy transverse cooling within high-field solenoids, with strong longitudinal heating. This approach and its recent simulation are discussed. Alternative approaches which more explicitly include emittance exchange are also presented. Round-to-flat beam transform, transverse slicing, and longitudinal bunch coalescence are possible components of the alternative approach. A more explicit understanding of solenoidal cooling beam dynamics is introduced.

  20. Automation Study for Longhorn Army Ammunition Plant Hand Held Signal Flight Assembly, Rocket Barrel Assembly, 40 MM Signal, Final Packaging/Pack-Out, and Star Finishing

    DTIC Science & Technology

    1990-03-01

    J.B. Webb Jonesboro , AR Farmington, MI Crimping Press Joraco Drake Corp. Smithfield, RI Phoenix, AZ Die Cutter Roll Cut Peerless Machinery Co. Harbour...be taken are detailed for each assembly procedure. The report provides overall system integration requirements. The layouts of the two manufacturing...buildings are detailed. Several component changes to the Hand Held Signals are proposed. None of these will affect the operation of the-final product

  1. Department of Defense’s Waiver of Competitive Prototyping Requirement for Enhanced Polar System Program

    DTIC Science & Technology

    2012-08-23

    objectives. Finally, the CAPS acquisition strategy anticipates the use of a cost- reimbursement contract for designing and building the system...The CAPS acquisition strategy anticipates the use of a cost- reimbursement contract for designing and building the system; however, it may be... reimbursement contract was chosen for the basic CAPS contract because of the nature of the design work, which includes software design and development

  2. Mass Property Measurements of the Mars Science Laboratory Rover

    NASA Technical Reports Server (NTRS)

    Fields, Keith

    2012-01-01

    The NASA/JPL Mars Science Laboratory (MSL) spacecraft mass properties were measured on a spin balance table prior to launch. This paper discusses the requirements and issues encountered with the setup, qualification, and testing using the spin balance table, and the idiosyncrasies encountered with the test system. The final mass measurements were made in the Payload Hazardous Servicing Facility (PHSF) at Kennedy Space Center on the fully assembled and fueled spacecraft. This set of environmental tests required that the control system for the spin balance machine be at a remote location, which posed additional challenges to the operation of the machine

  3. Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and the Long-Term Care Hospital Prospective Payment System and Policy Changes and Fiscal Year 2017 Rates; Quality Reporting Requirements for Specific Providers; Graduate Medical Education; Hospital Notification Procedures Applicable to Beneficiaries Receiving Observation Services; Technical Changes Relating to Costs to Organizations and Medicare Cost Reports; Finalization of Interim Final Rules With Comment Period on LTCH PPS Payments for Severe Wounds, Modifications of Limitations on Redesignation by the Medicare Geographic Classification Review Board, and Extensions of Payments to MDHs and Low-Volume Hospitals. Final rule.

    PubMed

    2016-08-22

    We are revising the Medicare hospital inpatient prospective payment systems (IPPS) for operating and capital-related costs of acute care hospitals to implement changes arising from our continuing experience with these systems for FY 2017. Some of these changes will implement certain statutory provisions contained in the Pathway for Sustainable Growth Reform Act of 2013, the Improving Medicare Post-Acute Care Transformation Act of 2014, the Notice of Observation Treatment and Implications for Care Eligibility Act of 2015, and other legislation. We also are providing the estimated market basket update to apply to the rate-of-increase limits for certain hospitals excluded from the IPPS that are paid on a reasonable cost basis subject to these limits for FY 2017. We are updating the payment policies and the annual payment rates for the Medicare prospective payment system (PPS) for inpatient hospital services provided by long-term care hospitals (LTCHs) for FY 2017. In addition, we are making changes relating to direct graduate medical education (GME) and indirect medical education payments; establishing new requirements or revising existing requirements for quality reporting by specific Medicare providers (acute care hospitals, PPS-exempt cancer hospitals, LTCHs, and inpatient psychiatric facilities), including related provisions for eligible hospitals and critical access hospitals (CAHs) participating in the Electronic Health Record Incentive Program; updating policies relating to the Hospital Value-Based Purchasing Program, the Hospital Readmissions Reduction Program, and the Hospital-Acquired Condition Reduction Program; implementing statutory provisions that require hospitals and CAHs to furnish notification to Medicare beneficiaries, including Medicare Advantage enrollees, when the beneficiaries receive outpatient observation services for more than 24 hours; announcing the implementation of the Frontier Community Health Integration Project Demonstration; and making technical corrections and changes to regulations relating to costs to related organizations and Medicare cost reports; we are providing notice of the closure of three teaching hospitals and the opportunity to apply for available GME resident slots under section 5506 of the Affordable Care Act. We are finalizing the provisions of interim final rules with comment period that relate to a temporary exception for certain wound care discharges from the application of the site neutral payment rate under the LTCH PPS for certain LTCHs; application of two judicial decisions relating to modifications of limitations on redesignation by the Medicare Geographic Classification Review Board; and legislative extensions of the Medicare-dependent, small rural hospital program and changes to the payment adjustment for low-volume hospitals.

  4. Extending the life and recycle capability of earth storable propellant systems.

    NASA Technical Reports Server (NTRS)

    Schweickert, T. F.

    1972-01-01

    Rocket propulsion systems for reusable vehicles will be required to operate reliably for a large number of missions with a minimum of maintenance and a fast turnaround. For the space shuttle reaction control system to meet these requirements, current and prior related system failures were examined for their impact on reuse and, where warranted, component design and/or system configuration changes were defined for improving system service life. It was found necessary to change the pressurization component arrangement used on many single-use applications in order to eliminate a prevalent check valve failure mode and to incorporate redundant expulsion capability in propellant tank designs to achieve the necessary system reliability. Material flaws in pressurant and propellant tanks were noted to have a significant effect on tank cycle life. Finally, maintenance considerations dictated a modularized systems approach, allowing the system to be removed from the vehicle for service and repair at a remote site.

  5. Mini-review: high rate algal ponds, flexible systems for sustainable wastewater treatment.

    PubMed

    Young, P; Taylor, M; Fallowfield, H J

    2017-06-01

    Over the last 20 years, there has been a growing requirement by governments around the world for organisations to adopt more sustainable practices. Wastewater treatment is no exception, with many currently used systems requiring large capital investment, land area and power consumption. High rate algal ponds offer a sustainable, efficient and lower cost option to the systems currently in use. They are shallow, mixed lagoon based systems, which aim to maximise wastewater treatment by creating optimal conditions for algal growth and oxygen production-the key processes which remove nitrogen and organic waste in HRAP systems. This design means they can treat wastewater to an acceptable quality within a fifth of time of other lagoon systems while using 50% less surface area. This smaller land requirement decreases both the construction costs and evaporative water losses, making larger volumes of treated water available for beneficial reuse. They are ideal for rural, peri-urban and remote communities as they require minimum power and little on-site management. This review will address the history of and current trends in high rate algal pond development and application; a comparison of their performance with other systems when treating various wastewaters; and discuss their potential for production of added-value products. Finally, the review will consider areas requiring further research.

  6. Designing Real-Time Systems in Ada (Trademark).

    DTIC Science & Technology

    1986-01-01

    e a. T * .K Ada .e 6 4J (FINAL REPORT) Real - Time Systems in Ada* Abstract Real-time software differs from other kinds of software in the sense that it...1-2 1.2.2 Functional Focus ...... ................ 1-2 1.3 ROLE OF ADA IN REAL - TIME SYSTEMS DESIGN. ..... 1-3 1.4 SCOPE OF THIS...MODELS OF REAL TIME SYSTEMS 8.1 REQUIREMENTS FOR TEMPORAL BEHAVIOR ANALYSIS . 8-1 8.2 METHODS OF TEMPORAL BEHAVIOR ANALYSIS.... ....... 8-4 8.3

  7. Lay out, test verification and in orbit performance of HELIOS a temperature control system

    NASA Technical Reports Server (NTRS)

    Brungs, W.

    1975-01-01

    HELIOS temperature control system is described. The main design features and the impact of interactions between experiment, spacecraft system, and temperature control system requirements on the design are discussed. The major limitations of the thermal design regarding a closer sun approach are given and related to test experience and performance data obtained in orbit. Finally the validity of the test results achieved with prototype and flight spacecraft is evaluated by comparison between test data, orbit temperature predictions and flight data.

  8. Radiometric calibration of the Earth observing system's imaging sensors

    NASA Technical Reports Server (NTRS)

    Slater, P. N.

    1987-01-01

    Philosophy, requirements, and methods of calibration of multispectral space sensor systems as applicable to the Earth Observing System (EOS) are discussed. Vicarious methods for calibration of low spatial resolution systems, with respect to the Advanced Very High Resolution Radiometer (AVHRR), are then summarized. Finally, a theoretical introduction is given to a new vicarious method of calibration using the ratio of diffuse-to-global irradiance at the Earth's surfaces as the key input. This may provide an additional independent method for in-flight calibration.

  9. Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project

    NASA Technical Reports Server (NTRS)

    Fern, Lisa

    2017-01-01

    This presentation summarizes the simulation work conducted by the Unmanned Aircraft Systems (UAS) Integration in the National Airspace System (NAS) Project. It focuses on the contribution of that research to the development of RTCA Special Committee 228's (SC-228) Minimum Operational Performance Standards (MOPS) for UAS. The research objectives and primary findings from four different human-in-the-loop simulations are discussed, along with the specific requirements these studies led to in the final MOPS document.

  10. Air Force Global Weather Central System Architecture Study. Final System/Subsystem Summary Report. Volume 4. Systems Analysis and Trade Studies

    DTIC Science & Technology

    1976-03-01

    atmosphere,as well as very fine grid cloud models and cloud probability models. Some of the new requirements that will be supported with this system are a...including the Advanced Prediction Model for the global atmosphere, as well as very fine grid cloud models and cloud proba- bility models. Some of the new...with the mapping and gridding function (imput and output)? Should the capability exist to interface raw ungridded data with the SID interface

  11. 50 CFR 660.113 - Trawl fishery-recordkeeping and reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... materials as well as other information stored in or accessible through a computer or other information retrieval system; worksheets; weight slips; preliminary, interim, and final tally sheets; receipts; checks... described in this paragraph. (i) Required information. All IFQ first receivers must provide the following...

  12. 48 CFR 31.202 - Direct costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS CONTRACT COST PRINCIPLES AND PROCEDURES Contracts With Commercial Organizations 31.202 Direct... amount as an indirect cost if the accounting treatment— (1) Is consistently applied to all final cost... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Direct costs. 31.202...

  13. 40 CFR 60.665 - Reporting and recordkeeping requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Volatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI... level or reading indicated by the organics monitoring device at the outlet of the absorber, condenser... the final recovery device in a recovery system, and where an organic compound monitoring device is not...

  14. 40 CFR 60.665 - Reporting and recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Volatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI... level or reading indicated by the organics monitoring device at the outlet of the absorber, condenser... the final recovery device in a recovery system, and where an organic compound monitoring device is not...

  15. Telescience Testbed Pilot Program

    NASA Technical Reports Server (NTRS)

    Gallagher, Maria L. (Editor); Leiner, Barry M. (Editor)

    1988-01-01

    The Telescience Testbed Pilot Program is developing initial recommendations for requirements and design approaches for the information systems of the Space Station era. During this quarter, drafting of the final reports of the various participants was initiated. Several drafts are included in this report as the University technical reports.

  16. Support to 2nd Generation RLV Propulsion Project Office

    NASA Technical Reports Server (NTRS)

    Lee, Thomas J.

    2002-01-01

    In this final report regarding support to the second generation RLV (Reusable Launch Vehicle) propulsion project office, a list of tasks accomplished is presented. During this period, Lee & Associates, LLC participated in numerous Systems Requirements Reviews (SRR) related to the Cobra development program.

  17. Gulf Oil Limited Partnership (MA0001091) | Chelsea Creek ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  18. Coastal Oil of New England, Inc. - Chelsea Terminal ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  19. Global South Terminal, LLC (MA0000825) | Chelsea Creek ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  20. Global REVCO Terminal, LLC (MA0003298) | Chelsea Creek ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  1. Irving Oil Terminal - Revere (MA0001929) | Chelsea Creek ...

    EPA Pesticide Factsheets

    2017-04-10

    EPA and the Massachusetts Department of Environmental Protection (MADEP) have developed final National Pollutant Discharge Elimination System (NPDES) permits for seven bulk petroleum storage facilities located along Chelsea River (Creek) in Chelsea and Revere, Massachusetts to meet the requirements of the Clean Water Act.

  2. Final Requirements--School Improvement Grants--Title I of the Elementary and Secondary Education Act of 1965. Final Rule. Federal Register, Part IV, Department of Education, 34 CFR Chapter II

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2015

    2015-01-01

    The Assistant Secretary for Elementary and Secondary Education adopts final requirements for the School Improvement Grants (SIG) program, authorized under section 1003(g) of title I of the Elementary and Secondary Education Act of 1965, as amended (ESEA). These final requirements make changes to the current SIG program requirements and implement…

  3. Spacecraft Communications System Verification Using On-Axis Near Field Measurement Techniques

    NASA Technical Reports Server (NTRS)

    Keating, Thomas; Baugh, Mark; Gosselin, R. B.; Lecha, Maria C.; Krebs, Carolyn A. (Technical Monitor)

    2000-01-01

    Determination of the readiness of a spacecraft for launch is a critical requirement. The final assembly of all subsystems must be verified. Testing of a communications system can mostly be done using closed-circuits (cabling to/from test ports), but the final connections to the antenna require radiation tests. The Tropical Rainfall Measuring Mission (TRMM) Project used a readily available 'near-fleld on-axis' equation to predict the values to be used for comparison with those obtained in a test program. Tests were performed in a 'clean room' environment at both Goddard Space Flight Center (GSFC) and in Japan at the Tanegashima Space Center (TnSC) launch facilities. Most of the measured values agreed with the predicted values to within 0.5 dB. This demonstrates that sometimes you can use relatively simple techniques to make antenna performance measurements when use of the 'far field ranges, anechoic chambers, or precision near-field ranges' are neither available nor practical. Test data and photographs are provided.

  4. Acquisition and analysis of accelerometer data

    NASA Astrophysics Data System (ADS)

    Verges, Keith R.

    1990-08-01

    Acceleration data reduction must be undertaken with a complete understanding of the physical process, the means by which the data are acquired, and finally, the calculations necessary to put the data into a meaningful format. Discussed here are the acceleration sensor requirements dictated by the measurements desired. Sensor noise, dynamic range, and linearity will be determined from the physical parameters of the experiment. The digitizer requirements are discussed. Here the system from sensor to digital storage medium will be integrated, and rules of thumb for experiment duration, filter response, and number of bits are explained. Data reduction techniques after storage are also discussed. Time domain operations including decimating, digital filtering, and averaging are covered, as well as frequency domain methods, including windowing and the difference between power and amplitude spectra, and simple noise determination via coherence analysis. Finally, an example experiment using the Teledyne Geotech Model 44000 Seismometer to measure from 1 Hz to 10(exp -6) Hz is discussed. The sensor, data acquisition system, and example spectra are presented.

  5. Acquisition and analysis of accelerometer data

    NASA Technical Reports Server (NTRS)

    Verges, Keith R.

    1990-01-01

    Acceleration data reduction must be undertaken with a complete understanding of the physical process, the means by which the data are acquired, and finally, the calculations necessary to put the data into a meaningful format. Discussed here are the acceleration sensor requirements dictated by the measurements desired. Sensor noise, dynamic range, and linearity will be determined from the physical parameters of the experiment. The digitizer requirements are discussed. Here the system from sensor to digital storage medium will be integrated, and rules of thumb for experiment duration, filter response, and number of bits are explained. Data reduction techniques after storage are also discussed. Time domain operations including decimating, digital filtering, and averaging are covered, as well as frequency domain methods, including windowing and the difference between power and amplitude spectra, and simple noise determination via coherence analysis. Finally, an example experiment using the Teledyne Geotech Model 44000 Seismometer to measure from 1 Hz to 10(exp -6) Hz is discussed. The sensor, data acquisition system, and example spectra are presented.

  6. 78 FR 46177 - Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...The Federal Energy Regulatory Commission (Commission) is revising its regulations to foster competition and transparency in ancillary services markets. The Commission is revising certain aspects of its current market-based rate regulations, ancillary services requirements under the pro forma open-access transmission tariff (OATT), and accounting and reporting requirements. Specifically, the Commission is revising its regulations to reflect reforms to its Avista policy governing the sale of ancillary services at market-based rates to public utility transmission providers. The Commission is also requiring each public utility transmission provider to add to its OATT Schedule 3 a statement that it will take into account the speed and accuracy of regulation resources in its determination of reserve requirements for Regulation and Frequency Response service, including as it reviews whether a self-supplying customer has made ``alternative comparable arrangements'' as required by the Schedule. The final rule also requires each public utility transmission provider to post certain Area Control Error data as described in the final rule. Finally, the Commission is revising the accounting and reporting requirements under its Uniform System of Accounts for public utilities and licensees and its forms, statements, and reports, contained in FERC Form No. 1, Annual Report of Major Electric Utilities, Licensees and Others, FERC Form No. 1-F, Annual Report for Nonmajor Public Utilities and Licensees, and FERC Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies, to better account for and report transactions associated with the use of energy storage devices in public utility operations.

  7. An assessment of clinical chemical sensing technology for potential use in space station health maintenance facility

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A Health Maintenance Facility is currently under development for space station application which will provide capabilities equivalent to those found on Earth. This final report addresses the study of alternate means of diagnosis and evaluation of impaired tissue perfusion in a microgravity environment. Chemical data variables related to the dysfunction and the sensors required to measure these variables are reviewed. A technology survey outlines the ability of existing systems to meet these requirements. How the candidate sensing system was subjected to rigorous testing is explored to determine its suitability. Recommendations for follow-on activities are included that would make the commercial system more appropriate for space station applications.

  8. A continuous dry 300 mK cooler for THz sensing applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Klemencic, G. M., E-mail: Georgina.Klemencic@astro.cf.ac.uk; Ade, P. A. R.; Sudiwala, R.

    We describe and demonstrate the automated operation of a novel cryostat design that is capable of maintaining an unloaded base temperature of less than 300 mK continuously, without the need to recycle the gases within the final cold head, as is the case for conventional single shot sorption pumped {sup 3}He cooling systems. This closed dry system uses only 5 l of {sup 3}He gas, making this an economical alternative to traditional systems where a long hold time is required. During testing, a temperature of 365 mK was maintained with a constant 20 μW load, simulating the cooling requirement ofmore » a far infrared camera.« less

  9. Automated Synthesis of Architecture of Avionic Systems

    NASA Technical Reports Server (NTRS)

    Chau, Savio; Xu, Joseph; Dang, Van; Lu, James F.

    2006-01-01

    The Architecture Synthesis Tool (AST) is software that automatically synthesizes software and hardware architectures of avionic systems. The AST is expected to be most helpful during initial formulation of an avionic-system design, when system requirements change frequently and manual modification of architecture is time-consuming and susceptible to error. The AST comprises two parts: (1) an architecture generator, which utilizes a genetic algorithm to create a multitude of architectures; and (2) a functionality evaluator, which analyzes the architectures for viability, rejecting most of the non-viable ones. The functionality evaluator generates and uses a viability tree a hierarchy representing functions and components that perform the functions such that the system as a whole performs system-level functions representing the requirements for the system as specified by a user. Architectures that survive the functionality evaluator are further evaluated by the selection process of the genetic algorithm. Architectures found to be most promising to satisfy the user s requirements and to perform optimally are selected as parents to the next generation of architectures. The foregoing process is iterated as many times as the user desires. The final output is one or a few viable architectures that satisfy the user s requirements.

  10. National Ignition Facility Laser System Performance

    DOE PAGES

    Spaeth, Mary L.; Manes, Kenneth R.; Bowers, M.; ...

    2017-03-23

    The National Ignition Facility (NIF) laser is the culmination of more than 40 years of work at Lawrence Livermore National Laboratory dedicated to the delivery of laser systems capable of driving experiments for the study of high-energy-density physics. Although NIF was designed to support a number of missions, it was clear from the beginning that its biggest challenge was to meet the requirements for pursuit of inertial confinement fusion. Meeting the Project Completion Criteria for NIF in 2009 and for the National Ignition Campaign (NIC) in 2012 included meeting the NIF Functional Requirements and Primary Criteria that were established formore » the project in 1994. Finally, during NIC and as NIF transitioned to a user facility, its goals were expanded to include requirements defined by the broader user community as well as by laser system designers and operators.« less

  11. Design Aspects of the VLBI2010 System - Progress Report of the IVS VLBI2010 Committee

    NASA Technical Reports Server (NTRS)

    Petrachenko, Bill; Niell, Arthur; Behrend, Dirk; Corey, Brian; Boehm, Johannes; Chralot, Patrick; Collioud, Arnaud; Gipson, John; Haas, Ruediger; Hobiger, Thomas; hide

    2009-01-01

    This report summarizes the progress made in developing the next generation VLBI system, dubbed the VLBI2010 system. The VLBI2010 Committee of the International VLBI Service for Geodesy and Astrometry (IVS) worked on the design aspects of the new system. The report covers Monte Carlo simulations showing the impact of the new operating modes on the final products. A section on system considerations describes the implications for the VLBI2010 system parameters by considering the new modes and system-related issues such as sensitivity, antenna slew rate, delay measurement error. RF1, frequency requirements, antenna deformation, and source structure corrections_ This is followed by a description of all major subsystems and recommendations for the network, station. and antenna. Then aspects of the feed, polarization processing. calibration, digital back end, and correlator subsystems are covered. A section is dedicated to the NASA. proof-of-concept demonstration. Finally, sections tm operational considerations, on risks and fallback options, and on the next steps complete the report.

  12. Atmospheric Monitoring Strategy for Ground Testing of Closed Ecological Life Support Systems

    NASA Technical Reports Server (NTRS)

    Feighery, John; Cavenall, Ivan; Knight, Amanda

    2004-01-01

    This paper reviews the evolution and current state of atmospheric monitoring on the International Space Station to provide context from which we can imagine a more advanced and integrated system. The unique environmental hazards of human space flight are identified and categorized into groups, taking into consideration the time required for the hazard to become a threat to human health or performance. The key functions of a comprehensive monitoring strategy for a closed ecological life support system are derived from past experience and a survey of currently available technologies for monitoring air quality. Finally, a system architecture is developed incorporating the lessons learned from ISS and other analogous closed life support systems. The paper concludes by presenting recommendations on how to proceed with requirements definition and conceptual design of an air monitoring system for exploration missions.

  13. Human factors certification in the development of future air traffic control systems

    NASA Technical Reports Server (NTRS)

    Evans, Alyson E.

    1994-01-01

    If human factors certification of aviation technologies aims to encompass the wide range of issues which need to be addressed for any new system, then human factors involvement must be present throughout the whole design process in a manner which relates to final certification. A certification process cannot simply be applied to the final product of design. Standards and guidelines will be required by designers at the outset of design for reference in preparing for certification. The most effective use of human factors principles, methods, and measures is made as part of an iterative design process, leading to a system which reflects these as far as possible. This particularly applies where the technology is complex and may be represented by a number of components or sub-systems. Some aspects of the system are best certified during early prototyping, when there is still scope to make changes to software or hardware. At this stage in design, financial and/or time pressures will not rule out the possibility of necessary changes, as may be the case later. Other aspects of the system will be best certified during the final phases of design when the system is in a more complete form and in a realistic environment.

  14. Analysis of static and dynamic characteristic of spindle system and its structure optimization in camshaft grinding machine

    NASA Astrophysics Data System (ADS)

    Feng, Jianjun; Li, Chengzhe; Wu, Zhi

    2017-08-01

    As an important part of the valve opening and closing controller in engine, camshaft has high machining accuracy requirement in designing. Taking the high-speed camshaft grinder spindle system as the research object and the spindle system performance as the optimizing target, this paper firstly uses Solidworks to establish the three-dimensional finite element model (FEM) of spindle system, then conducts static analysis and the modal analysis by applying the established FEM in ANSYS Workbench, and finally uses the design optimization function of the ANSYS Workbench to optimize the structure parameter in the spindle system. The study results prove that the design of the spindle system fully meets the production requirements, and the performance of the optimized spindle system is promoted. Besides, this paper provides an analysis and optimization method for other grinder spindle systems.

  15. Neighboring Extremal Guidance for Systems with Piecewise Linear Control Using Time As the Reference Variable

    DTIC Science & Technology

    1993-05-01

    obtained to provide a nominal control history . The guidance law is found by minimizing the V second variation of the suboptimal trajectory...deviations from the suboptimal trajectory to required changes in the nominal control history . The deviations from the suboptimal trajectory, used together...with the precomputed gains, determines the change in the nominal control history required to meet the final constraints while minimizing the change in

  16. Computer-Based Tools for Evaluating Graphical User Interfaces

    NASA Technical Reports Server (NTRS)

    Moore, Loretta A.

    1997-01-01

    The user interface is the component of a software system that connects two very complex system: humans and computers. Each of these two systems impose certain requirements on the final product. The user is the judge of the usability and utility of the system; the computer software and hardware are the tools with which the interface is constructed. Mistakes are sometimes made in designing and developing user interfaces because the designers and developers have limited knowledge about human performance (e.g., problem solving, decision making, planning, and reasoning). Even those trained in user interface design make mistakes because they are unable to address all of the known requirements and constraints on design. Evaluation of the user inter-face is therefore a critical phase of the user interface development process. Evaluation should not be considered the final phase of design; but it should be part of an iterative design cycle with the output of evaluation being feed back into design. The goal of this research was to develop a set of computer-based tools for objectively evaluating graphical user interfaces. The research was organized into three phases. The first phase resulted in the development of an embedded evaluation tool which evaluates the usability of a graphical user interface based on a user's performance. An expert system to assist in the design and evaluation of user interfaces based upon rules and guidelines was developed during the second phase. During the final phase of the research an automatic layout tool to be used in the initial design of graphical inter- faces was developed. The research was coordinated with NASA Marshall Space Flight Center's Mission Operations Laboratory's efforts in developing onboard payload display specifications for the Space Station.

  17. SCOS 2: ESA's new generation of mission control system

    NASA Technical Reports Server (NTRS)

    Jones, M.; Head, N. C.; Keyte, K.; Howard, P.; Lynenskjold, S.

    1994-01-01

    New mission-control infrastructure is currently being developed by ESOC, which will constitute the second generation of the Spacecraft Control Operations system (SCOS 2). The financial, functional and strategic requirements lying behind the new development are explained. The SCOS 2 approach is described. The technological implications of these approaches is described: in particular it is explained how this leads to the use of object oriented techniques to provide the required 'building block' approach. The paper summarizes the way in which the financial, functional and strategic requirements have been met through this combination of solutions. Finally, the paper outlines the development process to date, noting how risk reduction was achieved in the approach to new technologies and summarizes the current status future plans.

  18. We Canwatch It For You Wholesale

    NASA Astrophysics Data System (ADS)

    Lipton, Alan J.

    This chapter provides an introduction to video analytics—a branch of computer vision technology that deals with automatic detection of activities and events in surveillance video feeds. Initial applications focused on the security and surveillance space, but as the technology improves it is rapidly finding a home in many other application areas. This chapter looks at some of those spaces, the requirements they impose on video analytics systems, and provides an example architecture and set of technology components to meet those requirements. This exemplary system is put through its paces to see how it stacks up in an embedded environment. Finally, we explore the future of video analytics and examine some of the market requirements that are driving breakthroughs in both video analytics and processor platform technology alike.

  19. Gas Turbine Characteristics for a Large Civil Tilt-Rotor (LCTR)

    NASA Technical Reports Server (NTRS)

    Snyder, Christopher A.; Thurman, Douglas R.

    2010-01-01

    In support of the Fundamental Aeronautics Program, Subsonic Rotary Wing Project; an engine system study has been undertaken to help define and understand some of the major gas turbine engine parameters required to meet performance and weight requirements as defined by earlier vehicle system studies. These previous vehicle studies will be reviewed to help define gas turbine performance goals. Assumptions and analysis methods used will be described. Performance and weight estimates for a few conceptual gas turbine engines meeting these requirements will be given and discussed. Estimated performance for these conceptual engines over a wide speed variation (down to 50 percent power turbine rpm at high torque) will be presented. Finally, areas needing further effort will be suggested and discussed.

  20. 75 FR 49029 - Medicare Program; End-Stage Renal Disease Prospective Payment System

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ...This final rule implements a case-mix adjusted bundled prospective payment system (PPS) for Medicare outpatient end-stage renal disease (ESRD) dialysis facilities beginning January 1, 2011 (ESRD PPS), in compliance with the statutory requirement of the Medicare Improvements for Patients and Providers Act (MIPPA), enacted July 15, 2008. This ESRD PPS also replaces the current basic case-mix adjusted composite payment system and the methodologies for the reimbursement of separately billable outpatient ESRD services.

  1. Data General Corporation Advanced Operating System/Virtual Storage (AOS/ VS). Revision 7.60

    DTIC Science & Technology

    1989-02-22

    control list for each directory and data file. An access control list includes the users who can and cannot access files as well as the access...and any required data, it can -5- February 22, 1989 Final Evaluation Report Data General AOS/VS SYSTEM OVERVIEW operate asynchronously and in parallel...memory. The IOC can perform the data transfer without further interventiin from the CPU. The I/O channels interface with the processor or system

  2. System Architecture for a Military Weapon System Development Process to Integrate Design and the Manufacturing Process for Use by a Government Technical Development Agency

    DTIC Science & Technology

    2014-09-01

    elements of functional structure. Frequently the requirement for this is to ensure long- term retention of skilled people through the provision of an...operational and manufacturable, greatly reducing the design work remaining for Milestone C. 14. SUBJECT TERMS System Architecture, manufacturing...specialized ammunition technology item such as a fuze takes too long, from initial concept through final production design, which is approved for

  3. Output Feedback Pole-Placement in the Design of Compensators for Suboptimal Linear Quadratic Regulators.

    DTIC Science & Technology

    1979-06-01

    also extended to the class of stabilizable systems and the required compensator shown to possess a separation property. Finally the design methodology...Page 1.1. Block diagram of transfer function given in (1.28) ........... 15 3.3.1. Compensator structure for controllable and stabilizable systems ...response will be stable. The implemented output feedback control law will stabilize the total closed loop system . n nn Let [uin and iJi= 1 be the

  4. Results and Analysis from Space Suit Joint Torque Testing

    NASA Technical Reports Server (NTRS)

    Matty, Jennifer E.; Aitchison, Lindsay

    2009-01-01

    A space suit s mobility is critical to an astronaut s ability to perform work efficiently. As mobility increases, the astronaut can perform tasks for longer durations with less fatigue. The term mobility, with respect to space suits, is defined in terms of two key components: joint range of motion and joint torque. Individually these measures describe the path which in which a joint travels and the force required to move it through that path. Previous space suits mobility requirements were defined as the collective result of these two measures and verified by the completion of discrete functional tasks. While a valid way to impose mobility requirements, such a method does necessitate a solid understanding of the operational scenarios in which the final suit will be performing. Because the Constellation space suit system requirements are being finalized with a relatively immature concept of operations, the Space Suit Element team elected to define mobility in terms of its constituent parts to increase the likelihood that the future pressure garment will be mobile enough to enable a broad scope of undefined exploration activities. The range of motion requirements were defined by measuring the ranges of motion test subjects achieved while performing a series of joint maximizing tasks in a variety of flight and prototype space suits. The definition of joint torque requirements has proved more elusive. NASA evaluated several different approaches to the problem before deciding to generate requirements based on unmanned joint torque evaluations of six different space suit configurations being articulated through 16 separate joint movements. This paper discusses the experiment design, data analysis and results, and the process used to determine the final values for the Constellation pressure garment joint torque requirements.

  5. Propulsion requirements for communications satellites.

    NASA Technical Reports Server (NTRS)

    Isley, W. C.; Duck, K. I.

    1972-01-01

    The concept of characteristics thrust is introduced herein as a means of classifying propulsion system tasks related particularly to geosynchronous communications spacecraft. Approximate analytical models are developed to permit estimation of characteristic thrust for injection error corrections, orbit angle re-location, north-south station keeping, east-west station keeping, spin axis precession control, attitude rate damping, and orbit raising applications. Performance assessment factors are then outlined in terms of characteristic power, characteristic weight, and characteristic volume envelope, which are related to the characteristic thrust. Finally, selected performance curves are shown for power as a function of spacecraft weight, including the influence of duty cycle on north-south station keeping, a 90 degree orbit angle re-location in 14 days, and finally comparison of orbit raising tasks from low and intermediate orbits to a final geosynchronous station. Power requirements range from less than 75 watts for north-south station keeping on small payloads up to greater than 15 KW for a 180 day orbit raising mission including a 28.5 degree plane change.

  6. Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Delaware State Dept. of Education, Dover.

    This report responds to Delaware state legislation requiring the development of proposed revised regulations for the classification of students as learning disabled (LD). The report first describes the current system, noting that in 1997 15 percent of the student population were served under the Individuals with Disabilities Education Act and over…

  7. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  8. Management Tools for Bus Maintenance: Current Practices and New Methods. Final Report.

    ERIC Educational Resources Information Center

    Foerster, James; And Others

    Management of bus fleet maintenance requires systematic recordkeeping, management reporting, and work scheduling procedures. Tools for controlling and monitoring routine maintenance activities are in common use. These include defect and fluid consumption reports, work order systems, historical maintenance records, and performance and cost…

  9. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  10. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  11. 29 CFR 1952.354 - Final approval determination.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... satisfactorily providing reports to OSHA through participation in the Federal-State Unified Management Information System, the Assistant Secretary evaluated actual operations under the State plan for a period of... enterprise; and Indian reservations. (c) Arizona is required to maintain a State program which is at least as...

  12. 14 CFR 21.143 - Quality control data requirements; prime manufacturer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., purchased items, and parts and assemblies produced by manufacturers' suppliers including methods used to... special manufacturing processes involved, the means used to control the processes, the final test... procedure for recording review board decisions and disposing of rejected parts; (5) An outline of a system...

  13. Skylab thruster attitude control system

    NASA Technical Reports Server (NTRS)

    Wilmer, G. E., Jr.

    1974-01-01

    Preflight activities and the Skylab mission support effort for the thruster attitude control system (TACS) are documented. The preflight activities include a description of problems and their solutions encountered in the development, qualification, and flight checkout test programs. Mission support effort is presented as it relates to system performance assessment, real-time problem solving, flight anomalies, and the daily system evaluation. Finally, the detailed flight evaluation is presented for each phase of the mission using system telemetry data. Data assert that the TACS met or exceeded design requirements and fulfilled its assigned mission objectives.

  14. Modeling and simulation of high dimensional stochastic multiscale PDE systems at the exascale

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zabaras, Nicolas J.

    2016-11-08

    Predictive Modeling of multiscale and Multiphysics systems requires accurate data driven characterization of the input uncertainties, and understanding of how they propagate across scales and alter the final solution. This project develops a rigorous mathematical framework and scalable uncertainty quantification algorithms to efficiently construct realistic low dimensional input models, and surrogate low complexity systems for the analysis, design, and control of physical systems represented by multiscale stochastic PDEs. The work can be applied to many areas including physical and biological processes, from climate modeling to systems biology.

  15. Software Prototyping: A Case Report of Refining User Requirements for a Health Information Exchange Dashboard.

    PubMed

    Nelson, Scott D; Del Fiol, Guilherme; Hanseler, Haley; Crouch, Barbara Insley; Cummins, Mollie R

    2016-01-01

    Health information exchange (HIE) between Poison Control Centers (PCCs) and Emergency Departments (EDs) could improve care of poisoned patients. However, PCC information systems are not designed to facilitate HIE with EDs; therefore, we are developing specialized software to support HIE within the normal workflow of the PCC using user-centered design and rapid prototyping. To describe the design of an HIE dashboard and the refinement of user requirements through rapid prototyping. Using previously elicited user requirements, we designed low-fidelity sketches of designs on paper with iterative refinement. Next, we designed an interactive high-fidelity prototype and conducted scenario-based usability tests with end users. Users were asked to think aloud while accomplishing tasks related to a case vignette. After testing, the users provided feedback and evaluated the prototype using the System Usability Scale (SUS). Survey results from three users provided useful feedback that was then incorporated into the design. After achieving a stable design, we used the prototype itself as the specification for development of the actual software. Benefits of prototyping included having 1) subject-matter experts heavily involved with the design; 2) flexibility to make rapid changes, 3) the ability to minimize software development efforts early in the design stage; 4) rapid finalization of requirements; 5) early visualization of designs; 6) and a powerful vehicle for communication of the design to the programmers. Challenges included 1) time and effort to develop the prototypes and case scenarios; 2) no simulation of system performance; 3) not having all proposed functionality available in the final product; and 4) missing needed data elements in the PCC information system.

  16. Positioning navigation and timing service applications in cyber physical systems

    NASA Astrophysics Data System (ADS)

    Qu, Yi; Wu, Xiaojing; Zeng, Lingchuan

    2017-10-01

    The positioning navigation and timing (PNT) architecture was discussed in detail, whose history, evolvement, current status and future plan were presented, main technologies were listed, advantages and limitations of most technologies were compared, novel approaches were introduced, and future capacities were sketched. The concept of cyber-physical system (CPS) was described and their primary features were interpreted. Then the three-layer architecture of CPS was illustrated. Next CPS requirements on PNT services were analyzed, including requirements on position reference and time reference, requirements on temporal-spatial error monitor, requirements on dynamic services, real-time services, autonomous services, security services and standard services. Finally challenges faced by PNT applications in CPS were concluded. The conclusion was expected to facilitate PNT applications in CPS, and furthermore to provide references to the design and implementation of both architectures.

  17. Requirements controlled design: A method for discovery of discontinuous system boundaries in the requirements hyperspace

    NASA Astrophysics Data System (ADS)

    Hollingsworth, Peter Michael

    The drive toward robust systems design, especially with respect to system affordability throughout the system life-cycle, has led to the development of several advanced design methods. While these methods have been extremely successful in satisfying the needs for which they have been developed, they inherently leave a critical area unaddressed. None of them fully considers the effect of requirements on the selection of solution systems. The goal of all of current modern design methodologies is to bring knowledge forward in the design process to the regions where more design freedom is available and design changes cost less. Therefore, it seems reasonable to consider the point in the design process where the greatest restrictions are placed on the final design, the point in which the system level requirements are set. Historically the requirements have been treated as something handed down from above. However, neither the customer nor the solution provider completely understood all of the options that are available in the broader requirements space. If a method were developed that provided the ability to understand the full scope of the requirements space, it would allow for a better comparison of potential solution systems with respect to both the current and potential future requirements. The key to a requirements conscious method is to treat requirements differently from the traditional approach. The method proposed herein is known as Requirements Controlled Design (RCD). By treating the requirements as a set of variables that control the behavior of the system, instead of variables that only define the response of the system, it is possible to determine a-priori what portions of the requirements space that any given system is capable of satisfying. Additionally, it should be possible to identify which systems can satisfy a given set of requirements and the locations where a small change in one or more requirements poses a significant risk to a design program. This thesis puts forth the theory and methodology to enable RCD, and details and validates a specific method called the Modified Strength Pareto Evolutionary Algorithm (MSPEA).

  18. Final Technical Report - Advanced Optical Sensors to Minimize Energy Consumption in Polymer Extrusion Processes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Susan J. Foulk

    Project Objective: The objectives of this study are to develop an accurate and stable on-line sensor system to monitor color and composition on-line in polymer melts, to develop a scheme for using the output to control extruders to eliminate the energy, material and operational costs of off-specification product, and to combine or eliminate some extrusion processes. Background: Polymer extrusion processes are difficult to control because the quality achieved in the final product is complexly affected by the properties of the extruder screw, speed of extrusion, temperature, polymer composition, strength and dispersion properties of additives, and feeder system properties. Extruder systemsmore » are engineered to be highly reproducible so that when the correct settings to produce a particular product are found, that product can be reliably produced time after time. However market conditions often require changes in the final product, different products or grades may be processed in the same equipment, and feed materials vary from lot to lot. All of these changes require empirical adjustment of extruder settings to produce a product meeting specifications. Optical sensor systems that can continuously monitor the composition and color of the extruded polymer could detect process upsets, drift, blending oscillations, and changes in dispersion of additives. Development of an effective control algorithm using the output of the monitor would enable rapid corrections for changes in materials and operating conditions, thereby eliminating most of the scrap and recycle of current processing. This information could be used to identify extruder systems issues, diagnose problem sources, and suggest corrective actions in real-time to help keep extruder system settings within the optimum control region. Using these advanced optical sensor systems would give extruder operators real-time feedback from their process. They could reduce the amount of off-spec product produced and significantly reduce energy consumption. Also, because blending and dispersion of additives and components in the final product could be continuously verified, we believe that, in many cases, intermediate compounding steps could be eliminated (saving even more time and energy).« less

  19. Application of digital computer APU modeling techniques to control system design.

    NASA Technical Reports Server (NTRS)

    Bailey, D. A.; Burriss, W. L.

    1973-01-01

    Study of the required controls for a H2-O2 auxiliary power unit (APU) technology program for the Space Shuttle. A steady-state system digital computer program was prepared and used to optimize initial system design. Analytical models of each system component were included. The program was used to solve a nineteen-dimensional problem, and then time-dependent differential equations were added to the computer program to simulate transient APU system and control. Some system parameters were considered quasi-steady-state, and others were treated as differential variables. The dynamic control analysis proceeded from initial ideal control modeling (which considered one control function and assumed the others to be ideal), stepwise through the system (adding control functions), until all of the control functions and their interactions were considered. In this way, the adequacy of the final control design over the required wide range of APU operating conditions was established.

  20. Leveraging AMI data for distribution system model calibration and situational awareness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peppanen, Jouni; Reno, Matthew J.; Thakkar, Mohini

    The many new distributed energy resources being installed at the distribution system level require increased visibility into system operations that will be enabled by distribution system state estimation (DSSE) and situational awareness applications. Reliable and accurate DSSE requires both robust methods for managing the big data provided by smart meters and quality distribution system models. This paper presents intelligent methods for detecting and dealing with missing or inaccurate smart meter data, as well as the ways to process the data for different applications. It also presents an efficient and flexible parameter estimation method based on the voltage drop equation andmore » regression analysis to enhance distribution system model accuracy. Finally, it presents a 3-D graphical user interface for advanced visualization of the system state and events. Moreover, we demonstrate this paper for a university distribution network with the state-of-the-art real-time and historical smart meter data infrastructure.« less

  1. Data vs. information: A system paradigm

    NASA Technical Reports Server (NTRS)

    Billingsley, F. C.

    1982-01-01

    The data system designer requires data parameters, and is dependent on the user to convert information needs to these data parameters. This conversion will be done with more or less accuracy, beginning a chain of inaccuracies which propagate through the system, and which, in the end, may prevent the user from converting the data received into the information required. The concept to be pursued is that errors occur in various parts of the system, and, having occurred, propagate to the end. Modeling of the system may allow an estimation of the effects at any point and the final accumulated effect, and may prove a method of allocating an error budget among the system components. The selection of the various technical parameters which a data system must meet must be done in relation to the ability of the user to turn the cold, impersonal data into a live, personal decision or piece of information.

  2. A flexible flight display research system using a ground-based interactive graphics terminal

    NASA Technical Reports Server (NTRS)

    Hatfield, J. J.; Elkins, H. C.; Batson, V. M.; Poole, W. L.

    1975-01-01

    Requirements and research areas for the air transportation system of the 1980 to 1990's were reviewed briefly to establish the need for a flexible flight display generation research tool. Specific display capabilities required by aeronautical researchers are listed and a conceptual system for providing these capabilities is described. The conceptual system uses a ground-based interactive graphics terminal driven by real-time radar and telemetry data to generate dynamic, experimental flight displays. These displays are scan converted to television format, processed, and transmitted to the cockpits of evaluation aircraft. The attendant advantages of a Flight Display Research System (FDRS) designed to employ this concept are presented. The detailed implementation of an FDRS is described. The basic characteristics of the interactive graphics terminal and supporting display electronic subsystems are presented and the resulting system capability is summarized. Finally, the system status and utilization are reviewed.

  3. Leveraging AMI data for distribution system model calibration and situational awareness

    DOE PAGES

    Peppanen, Jouni; Reno, Matthew J.; Thakkar, Mohini; ...

    2015-01-15

    The many new distributed energy resources being installed at the distribution system level require increased visibility into system operations that will be enabled by distribution system state estimation (DSSE) and situational awareness applications. Reliable and accurate DSSE requires both robust methods for managing the big data provided by smart meters and quality distribution system models. This paper presents intelligent methods for detecting and dealing with missing or inaccurate smart meter data, as well as the ways to process the data for different applications. It also presents an efficient and flexible parameter estimation method based on the voltage drop equation andmore » regression analysis to enhance distribution system model accuracy. Finally, it presents a 3-D graphical user interface for advanced visualization of the system state and events. Moreover, we demonstrate this paper for a university distribution network with the state-of-the-art real-time and historical smart meter data infrastructure.« less

  4. Verification methodology for fault-tolerant, fail-safe computers applied to maglev control computer systems. Final report, July 1991-May 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lala, J.H.; Nagle, G.A.; Harper, R.E.

    1993-05-01

    The Maglev control computer system should be designed to verifiably possess high reliability and safety as well as high availability to make Maglev a dependable and attractive transportation alternative to the public. A Maglev control computer system has been designed using a design-for-validation methodology developed earlier under NASA and SDIO sponsorship for real-time aerospace applications. The present study starts by defining the maglev mission scenario and ends with the definition of a maglev control computer architecture. Key intermediate steps included definitions of functional and dependability requirements, synthesis of two candidate architectures, development of qualitative and quantitative evaluation criteria, and analyticalmore » modeling of the dependability characteristics of the two architectures. Finally, the applicability of the design-for-validation methodology was also illustrated by applying it to the German Transrapid TR07 maglev control system.« less

  5. Phased-array-fed antenna configuration study, volume 2

    NASA Technical Reports Server (NTRS)

    Sorbello, R. M.; Zaghloul, A. I.; Lee, B. S.; Siddiqi, S.; Geller, B. D.

    1983-01-01

    Increased capacity in future satellite systems can be achieved through antenna systems which provide multiplicity of frequency reuses at K sub a band. A number of antenna configurations which can provide multiple fixed spot beams and multiple independent spot scanning beams at 20 GHz are addressed. Each design incorporates a phased array with distributed MMIC amplifiers and phasesifters feeding a two reflector optical system. The tradeoffs required for the design of these systems and the corresponding performances are presented. Five final designs are studied. In so doing, a type of MMIC/waveguide transition is described, and measured results of the breadboard model are presented. Other hardware components developed are described. This includes a square orthomode transducer, a subarray fed with a beamforming network to measure scanning performance, and another subarray used to study mutual coupling considerations. Discussions of the advantages and disadvantages of the final design are included.

  6. The Pharmaceutical Capping Process-Correlation between Residual Seal Force, Torque Moment, and Flip-off Removal Force.

    PubMed

    Mathaes, Roman; Mahler, Hanns-Christian; Vorgrimler, Lothar; Steinberg, Henrik; Dreher, Sascha; Roggo, Yves; Nieto, Alejandra; Brown, Helen; Roehl, Holger; Adler, Michael; Luemkemann, Joerg; Huwyler, Joerg; Lam, Philippe; Stauch, Oliver; Mohl, Silke; Streubel, Alexander

    2016-01-01

    The majority of parenteral drug products are manufactured in glass vials with an elastomeric rubber stopper and a crimp cap. The vial sealing process is a critical process step during fill-and-finish operations, as it defines the seal quality of the final product. Different critical capping process parameters can affect rubber stopper defects, rubber stopper compression, container closure integrity, and also crimp cap quality. A sufficiently high force to remove the flip-off button prior to usage is required to ensure quality of the drug product unit by the flip-off button during storage, transportation, and until opening and use. Therefore, the final product is 100% visually inspected for lose or defective crimp caps, which is subjective as well as time- and labor-intensive. In this study, we sealed several container closure system configurations with different capping equipment settings (with corresponding residual seal force values) to investigate the torque moment required to turn the crimp cap. A correlation between torque moment and residual seal force has been established. The torque moment was found to be influenced by several parameters, including diameter of the vial head, type of rubber stopper (serum or lyophilized) and type of crimp cap (West(®) or Datwyler(®)). In addition, we measured the force required to remove the flip-off button of a sealed container closure system. The capping process had no influence on measured forces; however, it was possible to detect partially crimped vials. In conclusion, a controlled capping process with a defined target residual seal force range leads to a tight crimp cap on a sealed container closure system and can ensure product quality. The majority of parenteral drug products are manufactured in a glass vials with an elastomeric rubber stopper and a crimp cap. The vial sealing process is a critical process step during fill-and-finish operations, as it defines the seal quality of the final product. An adequate force to remove the flip-off button prior to usage is required to ensure product quality during storage and transportation until use. In addition, the complete crimp cap needs to be fixed in a tight position on the vial. In this study, we investigated the torque moment required to turn the crimp cap and the force required to remove the flip-off button of container closure system sealed with different capping equipment process parameters (having different residual seal force values). © PDA, Inc. 2016.

  7. 75 FR 7153 - National Organic Program; Access to Pasture (Livestock)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-17

    ...This final rule amends livestock and related provisions of the NOP regulations. Under the NOP, the Agricultural Marketing Service (AMS) oversees national standards for the production and handling of organically produced agricultural products. AMS has taken this action to ensure that NOP livestock production regulations have sufficient specificity and clarity to enable AMS and accredited certifying agents to efficiently administer the NOP and to facilitate and improve compliance and enforcement. This action is also intended to satisfy consumer expectations that ruminant livestock animals graze on pastures during the grazing season. This action provides clarification and specificity to the livestock feed and living conditions provisions and establishes a pasture practice standard for ruminant animals. In doing so, producers are required to: provide year-round access for all animals to the outdoors, recognize pasture as a crop, establish a functioning management plan for pasture, incorporate the pasture management plan into their organic system plan (OSP), provide ruminants with pasture throughout the grazing season for their geographical location, and ensure ruminants derive not less than an average of 30 percent of their dry matter intake (DMI) requirement from pasture grazed over the course of the grazing season. The proposed requirements for fencing of water bodies and providing water at all times, indoors and outdoors, and the requirement for a sacrificial pasture have been deleted in this final rule. In addition, the proposed amendment to the origin of livestock section has been deleted in this final rule as issues pertaining to that topic will be reviewed and evaluated separately from this action. This final rule requires that producers maintain ruminant slaughter stock on pasture for each day that the finishing period corresponds with the grazing season for the geographical location. However, this rule exempts ruminant slaughter stock from the 30 percent DMI from grazing requirement during the finishing period. Although we are issuing this as a final rule, we are requesting comments on the exceptions for finish feeding of ruminant slaughter stock, as discussed below under ``Livestock living conditions--Changes based on comments.'' The agency is providing an additional 60 day period to receive comments on provision Sec. 205.239(d).

  8. Medicare program; prospective payment system and consolidated billing for skilled nursing facilities for FY 2010; minimum data set, version 3.0 for skilled nursing facilities and Medicaid nursing facilities. Final rule.

    PubMed

    2009-08-11

    This final rule updates the payment rates used under the prospective payment system (PPS) for skilled nursing facilities (SNFs), for fiscal year (FY) 2010. In addition, it recalibrates the case-mix indexes so that they more accurately reflect parity in expenditures related to the implementation of case-mix refinements in January 2006. It also discusses the results of our ongoing analysis of nursing home staff time measurement data collected in the Staff Time and Resource Intensity Verification project, as well as a new Resource Utilization Groups, version 4 case-mix classification model for FY 2011 that will use the updated Minimum Data Set 3.0 resident assessment for case-mix classification. In addition, this final rule discusses the public comments that we have received on these and other issues, including a possible requirement for the quarterly reporting of nursing home staffing data, as well as on applying the quality monitoring mechanism in place for all other SNF PPS facilities to rural swing-bed hospitals. Finally, this final rule revises the regulations to incorporate certain technical corrections.

  9. Research in software allocation for advanced manned mission communications and tracking systems

    NASA Technical Reports Server (NTRS)

    Warnagiris, Tom; Wolff, Bill; Kusmanoff, Antone

    1990-01-01

    An assessment of the planned processing hardware and software/firmware for the Communications and Tracking System of the Space Station Freedom (SSF) was performed. The intent of the assessment was to determine the optimum distribution of software/firmware in the processing hardware for maximum throughput with minimum required memory. As a product of the assessment process an assessment methodology was to be developed that could be used for similar assessments of future manned spacecraft system designs. The assessment process was hampered by changing requirements for the Space Station. As a result, the initial objective of determining the optimum software/firmware allocation was not fulfilled, but several useful conclusions and recommendations resulted from the assessment. It was concluded that the assessment process would not be completely successful for a system with changing requirements. It was also concluded that memory requirements and hardware requirements were being modified to fit as a consequence of the change process, and although throughput could not be quantitized, potential problem areas could be identified. Finally, inherent flexibility of the system design was essential for the success of a system design with changing requirements. Recommendations resulting from the assessment included development of common software for some embedded controller functions, reduction of embedded processor requirements by hardwiring some Orbital Replacement Units (ORUs) to make better use of processor capabilities, and improvement in communications between software development personnel to enhance the integration process. Lastly, a critical observation was made regarding the software integration tasks did not appear to be addressed in the design process to the degree necessary for successful satisfaction of the system requirements.

  10. Benefits of Low-Power Electrothermal Propulsion

    NASA Technical Reports Server (NTRS)

    Oleson, Steven R.; Sankovic, John M.

    1997-01-01

    Mission analyses were completed to show the benefits of low-power electrothermal propulsion systems for three classes'of LEO smallsat missions. Three different electrothermal systems were considered: (1) a 40 W ammonia resistojet system, (2) a 600 W hydrazine arcjet system, and (3) a 300 W ammonia resistojet. The benefits of using two 40 W ammonia resistojet systems were analyzed for three months of drag makeup of a Shuttle-launched 100 kg spacecraft in a 297 km orbit. The two 46 W resistojets decreased the propulsion system wet mass by 50% when compared to state-of-art hydrazine monopropellant thrusters. The 600 W arcjet system was used for a 300 km sun synchronous makeup mission of a 1000 kg satellite and was found to decrease the wet propulsion mass by 30%. Finally, the 300 W arcjet system was used on a 200 kg Earth-orbiting spacecraft for both orbit transfer from 300 to 400 km, two years of drag makeup, and a final orbit rise to 700 km. The arcjet system was determined to halve the propulsion system wet mass required for that scenario as compared to hydrazine monopropellant thrusters.

  11. Occupational injury and illness recording and reporting requirements. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final rule.

    PubMed

    2001-01-19

    The Occupational Safety and Health Administration (OSHA) is revising its rule addressing the recording and reporting of occupational injuries and illnesses (29 CFR parts 1904 and 1952), including the forms employers use to record those injuries and illnesses. The revisions to the final rule will produce more useful injury and illness records, collect better information about the incidence of occupational injuries and illnesses on a national basis, promote improved employee awareness and involvement in the recording and reporting of job-related injuries and illnesses, simplify the injury and illness recordkeeping system for employers, and permit increased use of computers and telecommunications technology for OSHA recordkeeping purposes. This rulemaking completes a larger overall effort to revise Part 1904 of Title 29 of the Code of Federal Regulations. Two sections of Part 1904 have already been revised in earlier rulemakings. A rule titled Reporting fatalities and multiple hospitalization incidents to OSHA, became effective May 2, 1994 and has been incorporated into this final rule as Section 1904.39. A second rule entitled Annual OSHA injury and illness survey of ten or more employers became effective on March 13, 1997 and has been incorporated into this final rule as Section 1904.41. The final rule being published today also revises 29 CFR 1952.4, Injury and Illness Recording and Reporting Requirements, which prescribes the recordkeeping and reporting requirements for States that have an occupational safety and health program approved by OSHA under Section 18 of the Occupational Safety and Health Act (the "Act" or "OSH Act").

  12. 78 FR 79613 - Final Requirement-Migrant Education Program Consortium Incentive Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ... DEPARTMENT OF EDUCATION 34 CFR Chapter II [CFDA Number 84.144F] Final Requirement--Migrant Education Program Consortium Incentive Grant Program AGENCY: Office of Elementary and Secondary Education, Department of Education. ACTION: Final requirement. SUMMARY: The Assistant Secretary for Elementary and...

  13. Location Privacy in RFID Applications

    NASA Astrophysics Data System (ADS)

    Sadeghi, Ahmad-Reza; Visconti, Ivan; Wachsmann, Christian

    RFID-enabled systems allow fully automatic wireless identification of objects and are rapidly becoming a pervasive technology with various applications. However, despite their benefits, RFID-based systems also pose challenging risks, in particular concerning user privacy. Indeed, improvident use of RFID can disclose sensitive information about users and their locations allowing detailed user profiles. Hence, it is crucial to identify and to enforce appropriate security and privacy requirements of RFID applications (that are also compliant to legislation). This chapter first discusses security and privacy requirements for RFID-enabled systems, focusing in particular on location privacy issues. Then it explores the advances in RFID applications, stressing the security and privacy shortcomings of existing proposals. Finally, it presents new promising directions for privacy-preserving RFID systems, where as a case study we focus electronic tickets (e-tickets) for public transportation.

  14. Conceptual design of a 1-MW CW X-band transmitter for planetary radar

    NASA Technical Reports Server (NTRS)

    Bhanji, A. M.; Hoppe, D. J.; Conroy, B. L.; Freiley, A. J.

    1988-01-01

    A proposed conceptual design to increase the output power of an existing X-band radar transmitter used for planetary radar exploration from 365 kW to 1 MW CW is presented. The basic transmitter system requirements as dictated by the specifications for the radar are covered. The characteristics and expected performance of the high-power klystrons are considered, and the transmitter power amplifier system is described. Also included is the design of all of the associated high-power microwave components, the feed system, and the phase-stable exciter. The expected performance of the beam supply, heat exchanger, and monitor and control devices is also presented. Finally, an assessment of the state-of-the-art technology needed to meet system requirements is given and possible areas of difficulty are summarized.

  15. Conceptual design of a 1-MW CW X-band transmitter for planetary radar

    NASA Technical Reports Server (NTRS)

    Bhanji, A. M.; Hoppe, D. J.; Conroy, B. L.; Freiley, A. J.

    1990-01-01

    A proposed conceptual design to increase the output power of an existing X-band planetary radar transmitter used for planetary radar exploration from 365 kW to 1 MW CW is presented. The basic transmitter system requirements as dictated by the specifications for the radar are covered. The characteristics and expected performance of the high-power klystrons are considered, and the transmitter power amplifier system is discussed. Also included is the design of all of the associated high-power microwave components, the feed system, and the phase-stable exciter. The expected performance of the beam supply, heat exchanger, and monitor and control devices is also presented. Finally, an assessment of the state-of-the-art technology needed to meet system requirements is given and possible areas of difficulty are summarized.

  16. The 18 and 30 GHz fixed service communication satellite system study: Executive summary

    NASA Technical Reports Server (NTRS)

    Bronstein, L. M.

    1979-01-01

    The use of the 18 and 30 GHz bands for fixed service satellite communications is examined. Primary objectives were to determine if satellite communication systems using this allocation (27.5 to 30.0 GHz uplink; 17.7 to 20.2 GHz downlink) can be cost competitive with alternate means of communication, and to determine what technological developments would be required to make these systems competitive. To meet these objectives, the cost and performance to be expected of 18 and 30 GHz hardware in the 1985 to 1990 era was assessed, selected trunking and direct to user concepts were optimized, and the cost of these systems was estimated. Finally, the technology developments required to make the most promising of the concepts competitive were identified.

  17. Informatics in radiology: web-based preliminary reporting system for radiology residents with PACS integration.

    PubMed

    O'Connell, Timothy; Chang, Debra

    2012-01-01

    While on call, radiology residents review imaging studies and issue preliminary reports to referring clinicians. In the absence of an integrated reporting system at the training sites of the authors' institution, residents were typing and faxing preliminary reports. To partially automate the on-call resident workflow, a Web-based system for resident reporting was developed by using the free open-source xAMP Web application framework and an open-source DICOM (Digital Imaging and Communications in Medicine) software toolkit, with the goals of reducing errors and lowering barriers to education. This reporting system integrates with the picture archiving and communication system to display a worklist of studies. Patient data are automatically entered in the preliminary report to prevent identification errors and simplify the report creation process. When the final report for a resident's on-call study is available, the reporting system queries the report broker for the final report, and then displays the preliminary report side by side with the final report, thus simplifying the review process and encouraging review of all of the resident's reports. The xAMP Web application framework should be considered for development of radiology department informatics projects owing to its zero cost, minimal hardware requirements, ease of programming, and large support community.

  18. Design and Error Analysis of a Vehicular AR System with Auto-Harmonization.

    PubMed

    Foxlin, Eric; Calloway, Thomas; Zhang, Hongsheng

    2015-12-01

    This paper describes the design, development and testing of an AR system that was developed for aerospace and ground vehicles to meet stringent accuracy and robustness requirements. The system uses an optical see-through HMD, and thus requires extremely low latency, high tracking accuracy and precision alignment and calibration of all subsystems in order to avoid mis-registration and "swim". The paper focuses on the optical/inertial hybrid tracking system and describes novel solutions to the challenges with the optics, algorithms, synchronization, and alignment with the vehicle and HMD systems. Tracker accuracy is presented with simulation results to predict the registration accuracy. A car test is used to create a through-the-eyepiece video demonstrating well-registered augmentations of the road and nearby structures while driving. Finally, a detailed covariance analysis of AR registration error is derived.

  19. The High Energy Astronomy Observatory X-ray Telescope

    NASA Technical Reports Server (NTRS)

    Miller, R.; Austin, G.; Koch, D.; Jagoda, N.; Kirchner, T.; Dias, R.

    1978-01-01

    The High Energy Astronomy Observatory-Mission B (HEAO-B) is a satellite observatory for the purpose of performing a detailed X-ray survey of the celestial sphere. Measurements will be made of stellar radiation in the range 0.2 through 20 keV. The primary viewing requirement is to provide final aspect solution and internal alignment information to correlate an observed X-ray image with the celestial sphere to within one-and-one-half arc seconds. The Observatory consists of the HEAO Spacecraft together with the X-ray Telescope. The Spacecraft provides the required attitude control and determination system, data telemetry system, space solar power system, and interface with the launch vehicle. The X-ray Telescope includes a high resolution mirror assembly, optical bench metering structure, X-ray detectors, detector positioning system, detector electronics and aspect sensing system.

  20. Acquisition Management for System of Systems: Requirement Evolution and Acquisition Strategy Planning

    DTIC Science & Technology

    2013-01-29

    of modern portfolio and control theory . The reformulation allows for possible changes in estimated quantities (e.g., due to market shifts in... Portfolio Theory (MPT). Final Report: NPS award N00244-11-1-0003 5 Extending CEM and Markov: Agent-Based Modeling Approach Research conducted in the...integration and acquisition from a robust portfolio theory standpoint. Robust portfolio management methodologies have been widely used by financial

  1. Analysis of Requirements of On-Line Network Cataloging Services for Small, Academic, Public, School and Other Libraries: A Demonstration Project using the OCLC System. Final Report.

    ERIC Educational Resources Information Center

    Markuson, Barbara Evans

    This report results from a project using the OCLC system to provide catalog services to small libraries. Alternatives described include: centralized cataloging, centralized book processing, sharing of OCLC terminals, and use of dial-up terminals. The OCLC data base was found useful for all types of small libraries. It is recommended that network…

  2. Development of the Situation Awareness Flight Training and Simulation Evaluation (SAFTE) System: II: Final Development, Initial Test, and Documentation of the System

    DTIC Science & Technology

    1999-08-01

    Parkway, Cambridge, MA 02138, (617) 876-8085) has ready-to-use DIS/ HLA interfaces for the PC ($3500.00). The other work required involves improving the...bomb the Target Designator Box. (SA MEASURE B27 : When the aircraft passes 1,300 MSL, ask: YOU MUST ABORT THE ATTACK IF YOU HAVE NOT RELEASED THE

  3. The use of cluster analysis techniques in spaceflight project cost risk estimation

    NASA Technical Reports Server (NTRS)

    Fox, G.; Ebbeler, D.; Jorgensen, E.

    2003-01-01

    Project cost risk is the uncertainty in final project cost, contingent on initial budget, requirements and schedule. For a proposed mission, a dynamic simulation model relying for some of its input on a simple risk elicitation is used to identify and quantify systemic cost risk.

  4. The New DOD Instruction 5000.02: An Analysis of the Efficiencies to be Gained

    DTIC Science & Technology

    2015-06-01

    IT, and Information Systems • Post Implementation Review (PIR) • DOD Enterprise Architecture requirement • Cybersecurity Strategy for all IT... dam /rand/pubs/occasional_papers/2010/RAND_OP3 08.pdf President’s Blue Ribbon Commission on Defense Management. (1986). A quest for excellence, final

  5. 7 CFR 1710.115 - Final maturity.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... maturities for loans for the implementation of programs for demand side management and energy resource conservation and on and off grid renewable energy sources not owned by the borrower will be determined by RUS... finance working capital required for the initial operation of a new system are a separate class of loans...

  6. 40 CFR 51.365 - Data collection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... test start time and the time final emission scores are determined; (6) Vehicle Identification Number... enforcement of an I/M program. The program shall gather test data on individual vehicles, as well as quality... equipment is required or those test procedures relying upon a vehicle's OBD system). (a) Test data. The goal...

  7. 40 CFR 51.365 - Data collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... test start time and the time final emission scores are determined; (6) Vehicle Identification Number... enforcement of an I/M program. The program shall gather test data on individual vehicles, as well as quality... equipment is required or those test procedures relying upon a vehicle's OBD system). (a) Test data. The goal...

  8. Exploration of using GDOT's existing videolog images and pavement surface imaging data to support statewide maintenance practices : final report.

    DOT National Transportation Integrated Search

    2016-04-01

    Videolog and pavement imaging data is a valuable asset that has supported the Georgia Department of : Transportation (GDOT) and enable it to fulfill the requirements of its Highway Performance Monitoring : System (HPMS). To maximize the return on inv...

  9. Tectonic Evolution of Mars

    NASA Technical Reports Server (NTRS)

    Phillips, Roger J.

    1992-01-01

    The Final Technical Report on tectonic evolution of Mars is presented. Two papers and an abstract are included. Topics addressed include: scientific rationale and requirements for a global seismic network on Mars, permanent uplift in magmatic systems with application to the Tharsis Region of Mars, and the geophysical signal of the Martian global dichotomy.

  10. Cargo Movement Operations System (CMOS). Final Software Requirements Specification, (Applications CSCI), Increment II

    DTIC Science & Technology

    1991-01-29

    NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN ( ] CLOSED [ ] ORIGINATOR CONTROL Nt3MBFR: SRS1-0002 PROGRAM OFFICE CONTROL NUMBER: DATA ITEM...floppy diskette interface with CMOS. CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES ( 3 NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [

  11. Institutional factors in transportation systems and their potential for bias toward vehicles of particular characteristics : final report

    DOT National Transportation Integrated Search

    1977-08-01

    This report is required by Section 13(a) of the Electric and Hybrid Vehicle Research, Development and Demonstration Act of 1976 (PL94-413). It presents the evaluation of a number of institutional factors related to taxes, regulations, traffic behavio...

  12. 78 FR 8119 - Cancellation of the Notice of Intent To Prepare a Draft and Final Supplemental Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-05

    ... the Herbert Hoover Dike Major Rehabilitation Project, Martin and Palm Beach Counties AGENCY...-wide risk reduction approach as required for safety modifications to dams. FOR FURTHER INFORMATION...-2108. SUPPLEMENTARY INFORMATION: The supplemental MRR will be replaced with a system-wide Dam Safety...

  13. Reducing work zone crashes by using vehicle's flashers as a warning sign : final report

    DOT National Transportation Integrated Search

    2009-01-01

    Rural two-lane highways constitute a large percentage of the highway system in Kansas. Preserving, expending, : and enhancing these highways require the set-up of a large number of one-lane, two-way work zones where traffic : safety has been a severe...

  14. Final Environmental Assessment for the Installation of a Range Safety Lighting System at Avon Park Air Force Range, Florida

    DTIC Science & Technology

    2010-08-01

    considered with other activities that require additional artificial night lighting. For instance, the development of the new town of Destiny planned...Mobarkey, M. Barak, A. Hoyzman, and O. Halevy, 2004. Monochromatic Light Stimuli During Embryogenesis Enhances Embryo Development and Posthatch

  15. JT90 thermal barrier coated vanes

    NASA Technical Reports Server (NTRS)

    Sheffler, K. D.; Graziani, R. A.; Sinko, G. C.

    1982-01-01

    The technology of plasma sprayed thermal barrier coatings applied to turbine vane platforms in modern high temperature commercial engines was advanced to the point of demonstrated feasibility for application to commercial aircraft engines. The three thermal barrier coatings refined under this program are zirconia stabilized with twenty-one percent magnesia (21% MSZ), six percent yttria (6% YSZ), and twenty percent yttria (20% YSZ). Improvement in thermal cyclic endurance by a factor of 40 times was demonstrated in rig tests. A cooling system evolved during the program which featured air impingement cooling for the vane platforms rather than film cooling. The impingement cooling system, in combination with the thermal barrier coatings, reduced platform cooling air requirements by 44% relative to the current film cooling system. Improved durability and reduced cooling air requirements were demonstrated in rig and engine endurance tests. Two engine tests were conducted, one of 1000 cycles and the other of 1500 cycles. All three coatings applied to vanes fabricated with the final cooling system configuration completed the final 1500 cycle engine endurance test. Results of this test clearly demonstrated the durability of the 6% YSZ coating which was in very good condition after the test. The 21% MSZ and 20% YSZ coatings had numerous occurrences of significant spalling in the test.

  16. Evolving the NASA Near Earth Network for the Next Generation of Human Space Flight

    NASA Technical Reports Server (NTRS)

    Roberts, Christopher J.; Carter, David L.; Hudiburg, John J.; Tye, Robert N.; Celeste, Peter B.

    2014-01-01

    The purpose of this paper is to present the planned development and evolution of the NASA Near Earth Network (NEN) launch communications services in support of the next generation of human space flight programs. Following the final space shuttle mission in 2011, the two NEN launch communications stations were decommissioned. Today, NASA is developing the next generation of human space flight systems focused on exploration missions beyond low-earth orbit, and supporting the emerging market for commercial crew and cargo human space flight services. The NEN is leading a major initiative to develop a modern high data rate launch communications ground architecture with support from the Kennedy Space Center Ground Systems Development and Operations Program and in partnership with the U.S. Air Force (USAF) Eastern Range. This initiative, the NEN Launch Communications Stations (LCS) development project, successfully completed its System Requirements Review in November 2013. This paper provides an overview of the LCS project and a summary of its progress. The LCS ground architecture, concept of operations, and driving requirements to support the new heavy-lift Space Launch System and Orion Multi-Purpose Crew Vehicle for Exploration Mission-1 are presented. Finally, potential future extensions to the ground architecture beyond EM-1 are discussed.

  17. An Integrated Approach to Exploration Launch Office Requirements Development

    NASA Technical Reports Server (NTRS)

    Holladay, Jon B.; Langford, Gary

    2006-01-01

    The proposed paper will focus on the Project Management and Systems Engineering approach utilized to develop a set of both integrated and cohesive requirements for the Exploration Launch Office, within the Constellation Program. A summary of the programmatic drivers which influenced the approach along with details of the resulting implementation will be discussed as well as metrics evaluating the efficiency and accuracy of the various requirements development activities. Requirements development activities will focus on the procedures utilized to ensure that technical content was valid and mature in preparation for the Crew Launch Vehicle and Constellation System s Requirements Reviews. This discussion will begin at initial requirements development during the Exploration Systems Architecture Study and progress through formal development of the program structure. Specific emphasis will be given to development and validation of the requirements. This discussion will focus on approaches to garner the appropriate requirement owners (or customers), project infrastructure utilized to emphasize proper integration, and finally the procedure to technically mature, verify and validate the requirements. Examples of requirements being implemented on the Launch Vehicle (systems, interfaces, test & verification) will be utilized to demonstrate the various processes and also provide a top level understanding of the launch vehicle(s) performance goals. Details may also be provided on the approaches for verification, which range from typical aerospace hardware development (qualification/acceptance) through flight certification (flight test, etc.). The primary intent of this paper is to provide a demonstrated procedure for the development of a mature, effective, integrated set of requirements on a complex system, which also has the added intricacies of both heritage and new hardware development integration. Ancillary focus of the paper will include discussion of Test and Verification approaches along with top level systems/elements performance capabilities.

  18. Holistic approach for overlay and edge placement error to meet the 5nm technology node requirements

    NASA Astrophysics Data System (ADS)

    Mulkens, Jan; Slachter, Bram; Kubis, Michael; Tel, Wim; Hinnen, Paul; Maslow, Mark; Dillen, Harm; Ma, Eric; Chou, Kevin; Liu, Xuedong; Ren, Weiming; Hu, Xuerang; Wang, Fei; Liu, Kevin

    2018-03-01

    In this paper, we discuss the metrology methods and error budget that describe the edge placement error (EPE). EPE quantifies the pattern fidelity of a device structure made in a multi-patterning scheme. Here the pattern is the result of a sequence of lithography and etching steps, and consequently the contour of the final pattern contains error sources of the different process steps. EPE is computed by combining optical and ebeam metrology data. We show that high NA optical scatterometer can be used to densely measure in device CD and overlay errors. Large field e-beam system enables massive CD metrology which is used to characterize the local CD error. Local CD distribution needs to be characterized beyond 6 sigma, and requires high throughput e-beam system. We present in this paper the first images of a multi-beam e-beam inspection system. We discuss our holistic patterning optimization approach to understand and minimize the EPE of the final pattern. As a use case, we evaluated a 5-nm logic patterning process based on Self-Aligned-QuadruplePatterning (SAQP) using ArF lithography, combined with line cut exposures using EUV lithography.

  19. Fuzzy logic techniques for rendezvous and docking of two geostationary satellites

    NASA Technical Reports Server (NTRS)

    Ortega, Guillermo

    1995-01-01

    Large assemblings in space require the ability to manage rendezvous and docking operations. In future these techniques will be required for the gradual build up of big telecommunication platforms in the geostationary orbit. The paper discusses the use of fuzzy logic to model and implement a control system for the docking/berthing of two satellites in geostationary orbit. The system mounted in a chaser vehicle determines the actual state of both satellites and generates torques to execute maneuvers to establish the structural latching. The paper describes the proximity operations to collocate the two satellites in the same orbital window, the fuzzy guidance and navigation of the chaser approaching the target and the final Fuzzy berthing. The fuzzy logic system represents a knowledge based controller that realizes the close loop operations autonomously replacing the conventional control algorithms. The goal is to produce smooth control actions in the proximity of the target and during the docking to avoid disturbance torques in the final assembly orbit. The knowledge of the fuzzy controller consists of a data base of rules and the definitions of the fuzzy sets. The knowledge of an experienced spacecraft controller is captured into a set of rules forming the Rules Data Base.

  20. Fly-By-Light/Power-By-Wire Requirements and Technology Workshop

    NASA Technical Reports Server (NTRS)

    Baker, Robert L. (Editor); Pitts, Felix L. (Editor)

    1992-01-01

    The results of the Fly-By-Light/Power-By-Wire (FBL/PBW) Workshop held on March 17-19, 1992, at the NASA Langley Research Center are presented. The FBL/PBW program is a joint NASA LeRC/LaRC effort to develop the technology base for confident application of integrated FBL/PBW systems to transport aircraft. The objectives of the workshop were to ascertain the FBL/PBW program technical requirements and satisfy the requirements and needs from the industry viewpoint, provide a forum for presenting and documenting alternative technical approaches which satisfy the requirements, and assess the plan adequacy in accomplishing plan objectives, aims, and technology transfer. Areas addressed were: optical sensor systems, power-by-wire systems, FBL/PBW fault-tolerant architectures, electromagnetic environment assessment, and system integration and demonstration. The workshop consisted of an introductory meeting, a 'keynote' presentation, a series of individual panel sessions covering the above areas, with midway presentations by the panel chairpersons, followed by a final summarizing/integrating session by the individual panels, and a closing plenary session summarizing the results of the workshop.

  1. Systems budgets architecture and development for the Maunakea Spectroscopic Explorer

    NASA Astrophysics Data System (ADS)

    Mignot, Shan; Flagey, Nicolas; Szeto, Kei; Murowinski, Rick; McConnachie, Alan

    2016-08-01

    The Maunakea Spectroscopic Explorer (MSE) project is an enterprise to upgrade the existing Canada-France- Hawaii observatory into a spectroscopic facility based on a 10 meter-class telescope. As such, the project relies on engineering requirements not limited only to its instruments (the low, medium and high resolution spectrographs) but for the whole observatory. The science requirements, the operations concept, the project management and the applicable regulations are the basis from which these requirements are initially derived, yet they do not form hierarchies as each may serve several purposes, that is, pertain to several budgets. Completeness and consistency are hence the main systems engineering challenges for such a large project as MSE. Special attention is devoted to ensuring the traceability of requirements via parametric models, derivation documents, simulations, and finally maintaining KAOS diagrams and a database under IBM Rational DOORS linking them together. This paper will present the architecture of the main budgets under development and the associated processes, expand to highlight those that are interrelated and how the system, as a whole, is then optimized by modelling and analysis of the pertinent system parameters.

  2. A low cost virtual reality system for home based rehabilitation of the arm following stroke: a randomised controlled feasibility trial

    PubMed Central

    Standen, PJ; Threapleton, K; Richardson, A; Connell, L; Brown, DJ; Battersby, S; Platts, F; Burton, A

    2016-01-01

    Objective: To assess the feasibility of conducting a randomised controlled trial of a home-based virtual reality system for rehabilitation of the arm following stroke. Design: Two group feasibility randomised controlled trial of intervention versus usual care. Setting: Patients’ homes. Participants: Patients aged 18 or over, with residual arm dysfunction following stroke and no longer receiving any other intensive rehabilitation. Interventions: Eight weeks’ use of a low cost home-based virtual reality system employing infra-red capture to translate the position of the hand into game play or usual care. Main measures: The primary objective was to collect information on the feasibility of a trial, including recruitment, collection of outcome measures and staff support required. Patients were assessed at three time points using the Wolf Motor Function Test, Nine-Hole Peg Test, Motor Activity Log and Nottingham Extended Activities of Daily Living. Results: Over 15 months only 47 people were referred to the team. Twenty seven were randomised and 18 (67%) of those completed final outcome measures. Sample size calculation based on data from the Wolf Motor Function Test indicated a requirement for 38 per group. There was a significantly greater change from baseline in the intervention group on midpoint Wolf Grip strength and two subscales of the final Motor Activity Log. Training in the use of the equipment took a median of 230 minutes per patient. Conclusions: To achieve the required sample size, a definitive home-based trial would require additional strategies to boost recruitment rates and adequate resources for patient support. PMID:27029939

  3. A low cost virtual reality system for home based rehabilitation of the arm following stroke: a randomised controlled feasibility trial.

    PubMed

    Standen, P J; Threapleton, K; Richardson, A; Connell, L; Brown, D J; Battersby, S; Platts, F; Burton, A

    2017-03-01

    To assess the feasibility of conducting a randomised controlled trial of a home-based virtual reality system for rehabilitation of the arm following stroke. Two group feasibility randomised controlled trial of intervention versus usual care. Patients' homes. Patients aged 18 or over, with residual arm dysfunction following stroke and no longer receiving any other intensive rehabilitation. Eight weeks' use of a low cost home-based virtual reality system employing infra-red capture to translate the position of the hand into game play or usual care. The primary objective was to collect information on the feasibility of a trial, including recruitment, collection of outcome measures and staff support required. Patients were assessed at three time points using the Wolf Motor Function Test, Nine-Hole Peg Test, Motor Activity Log and Nottingham Extended Activities of Daily Living. Over 15 months only 47 people were referred to the team. Twenty seven were randomised and 18 (67%) of those completed final outcome measures. Sample size calculation based on data from the Wolf Motor Function Test indicated a requirement for 38 per group. There was a significantly greater change from baseline in the intervention group on midpoint Wolf Grip strength and two subscales of the final Motor Activity Log. Training in the use of the equipment took a median of 230 minutes per patient. To achieve the required sample size, a definitive home-based trial would require additional strategies to boost recruitment rates and adequate resources for patient support.

  4. Advanced electric propulsion system concept for electric vehicles

    NASA Technical Reports Server (NTRS)

    Raynard, A. E.; Forbes, F. E.

    1979-01-01

    Seventeen propulsion system concepts for electric vehicles were compared to determine the differences in components and battery pack to achieve the basic performance level. Design tradeoffs were made for selected configurations to find the optimum component characteristics required to meet all performance goals. The anticipated performance when using nickel-zinc batteries rather than the standard lead-acid batteries was also evaluated. The two systems selected for the final conceptual design studies included a system with a flywheel energy storage unit and a basic system that did not have a flywheel. The flywheel system meets the range requirement with either lead-acid or nickel-zinc batteries and also the acceleration of zero to 89 km/hr in 15 s. The basic system can also meet the required performance with a fully charged battery, but, when the battery approaches 20 to 30 percent depth of discharge, maximum acceleration capability gradually degrades. The flywheel system has an estimated life-cycle cost of $0.041/km using lead-acid batteries. The basic system has a life-cycle cost of $0.06/km. The basic system, using batteries meeting ISOA goals, would have a life-cycle cost of $0.043/km.

  5. Medicare Program; Inpatient Psychiatric Facilities Prospective Payment System--Update for Fiscal Year Beginning October 1, 2015 (FY 2016). Final rule.

    PubMed

    2015-08-05

    This final rule updates the prospective payment rates for Medicare inpatient hospital services provided by inpatient psychiatric facilities (IPFs) (which are freestanding IPFs and psychiatric units of an acute care hospital or critical access hospital). These changes are applicable to IPF discharges occurring during fiscal year (FY) 2016 (October 1, 2015 through September 30, 2016). This final rule also implements: a new 2012-based IPF market basket; an updated IPF labor-related share; a transition to new Core Based Statistical Area (CBSA) designations in the FY 2016 IPF Prospective Payment System (PPS) wage index; a phase-out of the rural adjustment for IPF providers whose status changes from rural to urban as a result of the wage index CBSA changes; and new quality measures and reporting requirements under the IPF quality reporting program. This final rule also reminds IPFs of the October 1, 2015 implementation of the International Classification of Diseases, 10th Revision, Clinical Modification (ICD-10-CM), and updates providers on the status of IPF PPS refinements.

  6. RF System Requirements for a Medium-Energy Electron-Ion Collider (MEIC) at JLab

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rimmer, Robert A; Hannon, Fay E; Guo, Jiquan

    2015-09-01

    JLab is studying options for a medium energy electron-ion collider that could fit on the JLab site and use CEBAF as a full-energy electron injector. A new ion source, linac and booster would be required, together with collider storage rings for the ions and electrons. In order to achieve the maximum luminosity these will be high-current storage rings with many bunches. We present the high-level RF system requirements for the storage rings, ion booster ring and high-energy ion beam cooling system, and describe the technology options under consideration to meet them. We also present options for staging that might reducemore » the initial capital cost while providing a smooth upgrade path to a higher final energy. The technologies under consideration may also be useful for other proposed storage ring colliders or ultimate light sources.« less

  7. Implementation of the semiclassical quantum Fourier transform in a scalable system.

    PubMed

    Chiaverini, J; Britton, J; Leibfried, D; Knill, E; Barrett, M D; Blakestad, R B; Itano, W M; Jost, J D; Langer, C; Ozeri, R; Schaetz, T; Wineland, D J

    2005-05-13

    We report the implementation of the semiclassical quantum Fourier transform in a system of three beryllium ion qubits (two-level quantum systems) confined in a segmented multizone trap. The quantum Fourier transform is the crucial final step in Shor's algorithm, and it acts on a register of qubits to determine the periodicity of the quantum state's amplitudes. Because only probability amplitudes are required for this task, a more efficient semiclassical version can be used, for which only single-qubit operations conditioned on measurement outcomes are required. We apply the transform to several input states of different periodicities; the results enable the location of peaks corresponding to the original periods. This demonstration incorporates the key elements of a scalable ion-trap architecture, suggesting the future capability of applying the quantum Fourier transform to a large number of qubits as required for a useful quantum factoring algorithm.

  8. Determining coordinates of the rotational pole using satellite data from four sites

    NASA Astrophysics Data System (ADS)

    Pisacane, V. L.; Dillon, S. C.

    1981-02-01

    The precision of the terrestrial coordinates of the rotational pole was determined from the satellite data using the Navy Navigation Satellite System (TRANSIT). Observations were made in Maine, Minnesota, California, and Hawaii; the data agreed with extrapolated and final coordinates from the Bureau International de l'Heure and final coordinates from the Doppler Polar Motion Service. The investigation indicates that low-cost and near-real-time estimates of the terrestrial coordinates of the pole are available as a by-product of the routine support required for the TRANSIT.

  9. Massive Black Hole Mergers: Can We "See" what LISA will "Hear"?

    NASA Technical Reports Server (NTRS)

    Centrella, Joan

    2010-01-01

    The final merger of massive black holes produces strong gravitational radiation that can be detected by the space-borne LISA. If the black hole merger takes place in the presence of gas and magnetic fields, various types of electromagnetic signals may also be produced. Modeling such electromagnetic counterparts of the final merger requires evolving the behavior of both gas and fields in the strong-field regions around the black holes. We will review current efforts to simulate these systems, and discuss possibilities for observing the electromagnetic signals they produce.

  10. Acquisition Management for Systems-of-Systems: Exploratory Model Development and Experimentation

    DTIC Science & Technology

    2009-04-22

    outputs of the Requirements Development and Logical Analysis processes into alternative design solutions and selects a final design solution. Decision...Analysis Provides the basis for evaluating and selecting alternatives when decisions need to be made. Implementation Yields the lowest-level system... Dependenc y Matrix 1 ⎥ ⎥ ⎥ ⎦ ⎤ ⎢ ⎢ ⎢ ⎣ ⎡ 011 100 110 2 ⎥ ⎥ ⎥ ⎦ ⎤ ⎢ ⎢ ⎢ ⎣ ⎡ 000 100 100 a) Example of SoS b) Model Structure for Example SoS

  11. The AFGL (Air Force Geophysics Laboratory) Absolute Gravity Measuring System. A Final Report and Operating/Maintenance Manual.

    DTIC Science & Technology

    1983-10-28

    Attempts to remove disturbing magnetic effects included: (1) demagnetizing as many parts of the system as was practical, (2) changing the size of...differences between the two bodies and/or residual magnetism . Repeated demagnetization of various compo-A nents showed little or no improvements. All...of seismic noise was a long period com- mercial seismometer. Aside from the bulk required to incorporate this system, * as seen in Figure 4 (2), [in

  12. The shock-absorbed system of the airplane landing gear

    NASA Technical Reports Server (NTRS)

    Callerio, Pietro

    1940-01-01

    A discussion is given of the behavior of the shock-absorbing system, consisting of elastic struts and tires, under landing, take-off, and taxying conditions, and a general formula derived for obtaining the minimum stroke required to satisfy the conditions imposed on the landing gear. Finally, the operation of some typical shock-absorbing systems are examined and the necessity brought out for taking into account, in dynamic landing-gear tests, the effect of the wing lift at the instant of contact with the ground.

  13. Systems Issues In Terrestrial Fiber Optic Link Reliability

    NASA Astrophysics Data System (ADS)

    Spencer, James L.; Lewin, Barry R.; Lee, T. Frank S.

    1990-01-01

    This paper reviews fiber optic system reliability issues from three different viewpoints - availability, operating environment, and evolving technologies. Present availability objectives for interoffice links and for the distribution loop must be re-examined for applications such as the Synchronous Optical Network (SONET), Fiber-to-the-Home (FTTH), and analog services. The hostile operating environments of emerging applications (such as FTTH) must be carefully considered in system design as well as reliability assessments. Finally, evolving technologies might require the development of new reliability testing strategies.

  14. Medical devices; exemption from premarket notification; Class II devices; optical impression systems for computer assisted design and manufacturing. Final rule.

    PubMed

    2003-04-22

    The Food and Drug Administration (FDA) is publishing an order granting a petition requesting exemption from the premarket notification requirements for data acquisition units for ceramic dental restoration systems. This rule exempts from premarket notification data acquisition units for ceramic dental restoration systems and establishes a guidance document as a special control for this device. FDA is publishing this order in accordance with the Food and Drug Administration Modernization Act of 1997 (FDAMA).

  15. Respiratory protective device design using control system techniques

    NASA Technical Reports Server (NTRS)

    Burgess, W. A.; Yankovich, D.

    1972-01-01

    The feasibility of a control system analysis approach to provide a design base for respiratory protective devices is considered. A system design approach requires that all functions and components of the system be mathematically identified in a model of the RPD. The mathematical notations describe the operation of the components as closely as possible. The individual component mathematical descriptions are then combined to describe the complete RPD. Finally, analysis of the mathematical notation by control system theory is used to derive compensating component values that force the system to operate in a stable and predictable manner.

  16. Multi-aperture microoptical system for close-up imaging

    NASA Astrophysics Data System (ADS)

    Berlich, René; Brückner, Andreas; Leitel, Robert; Oberdörster, Alexander; Wippermann, Frank; Bräuer, Andreas

    2014-09-01

    Modern applications in biomedical imaging, machine vision and security engineering require close-up optical systems with high resolution. Combined with the need for miniaturization and fast image acquisition of extended object fields, the design and fabrication of respective devices is extremely challenging. Standard commercial imaging solutions rely on bulky setups or depend on scanning techniques in order to meet the stringent requirements. Recently, our group has proposed a novel, multi-aperture approach based on parallel image transfer in order to overcome these constraints. It exploits state of the art microoptical manufacturing techniques on wafer level in order to create a compact, cost-effective system with a large field of view. However, initial prototypes have so far been subject to various limitations regarding their manufacturing, reliability and applicability. In this work, we demonstrate the optical design and fabrication of an advanced system, which overcomes these restrictions. In particular, a revised optical design facilitates a more efficient and economical fabrication process and inherently improves system reliability. An additional customized front side illumination module provides homogeneous white light illumination over the entire field of view while maintaining a high degree of compactness. Moreover, the complete imaging assembly is mounted on a positioning system. In combination with an extended working range, this allows for adjustment of the system's focus location. The final optical design is capable of capturing an object field of 36x24 mm2 with a resolution of 150 cycles/mm. Finally, we present experimental results of the respective prototype that demonstrate its enhanced capabilities.

  17. 75 FR 31118 - Medicare Program; Hospital Inpatient Prospective Payment Systems for Acute Care Hospitals and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ...This notice contains the final wage indices, hospital reclassifications, payment rates, impacts, and other related tables effective for the fiscal year (FY) 2010 hospital inpatient prospective payment systems (IPPS) and rate year 2010 long-term care hospital (LTCH) prospective payment system (PPS). The rates, tables, and impacts included in this notice reflect changes required by or resulting from the implementation of several provisions of the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010. These provisions require the extension of the expiration date for certain geographic reclassifications and special exception wage indices through September 30, 2010; and certain market basket updates for the IPPS and LTCH PPS.

  18. US Navy SHF SATCOM: Past, present and future

    NASA Astrophysics Data System (ADS)

    Bushnell, Christopher J.

    1994-06-01

    This thesis discusses the Navy's Super High Frequency Satellite Communications (SHF SATCOM) capabilities prior to Desert Shield/Desert Storm, and the requirements for future systems that were generated due to Navy SATCOM shortcomings during the Gulf War. The four-phased evolutionary approach the Navy has designed (based on post-war requirements) to provide itself with a medium for SHF SATCOM into the 21st Century, as well as the Defense Satellite Communications Systems (DSCS), are examined in detail. Decreasing defense budgets have begun to have a significant impact on future military satellite communication (MILSATCOM) systems. A cost comparison between utilization of DSCS III satellites and the INMARSAT commercial SATCOM system is presented. Recommended improvements to current MILSATCOM procedures and training practices are proposed that could improve operational C4I capabilities. Finally, this study determines that future SATCOM architectures should include a mixture of commercial systems and MILSATCOM systems to provide both cost savings and command and control protection.

  19. A comparison of production system life cycle models

    NASA Astrophysics Data System (ADS)

    Attri, Rajesh; Grover, Sandeep

    2012-09-01

    Companies today need to keep up with the rapidly changing market conditions to stay competitive. The main issues in this paper are related to a company's market and its competitors. The prediction of market behavior is helpful for a manufacturing enterprise to build efficient production systems. However, these predictions are usually not reliable. A production system is required to adapt to changing markets, but such requirement entails higher cost. Hence, analyzing different life cycle models of the production system is necessary. In this paper, different life cycle models of the production system are compared to evaluate the distinctive features and the limitations of each model. Furthermore, the difference between product life cycle and production life cycle is summarized, and the effect of product life cycle on production life cycle is explained. Finally, a production system life cycle model, along with key activities to be performed in each stage, is proposed specifically for the manufacturing sector.

  20. Acoustic Biometric System Based on Preprocessing Techniques and Linear Support Vector Machines

    PubMed Central

    del Val, Lara; Izquierdo-Fuente, Alberto; Villacorta, Juan J.; Raboso, Mariano

    2015-01-01

    Drawing on the results of an acoustic biometric system based on a MSE classifier, a new biometric system has been implemented. This new system preprocesses acoustic images, extracts several parameters and finally classifies them, based on Support Vector Machine (SVM). The preprocessing techniques used are spatial filtering, segmentation—based on a Gaussian Mixture Model (GMM) to separate the person from the background, masking—to reduce the dimensions of images—and binarization—to reduce the size of each image. An analysis of classification error and a study of the sensitivity of the error versus the computational burden of each implemented algorithm are presented. This allows the selection of the most relevant algorithms, according to the benefits required by the system. A significant improvement of the biometric system has been achieved by reducing the classification error, the computational burden and the storage requirements. PMID:26091392

  1. Advanced Caution and Warning System, Final Report - 2011

    NASA Technical Reports Server (NTRS)

    Spirkovska, Lilly; Aaseng, Gordon; Iverson, David; McCann, Robert S.; Robinson, Peter; Dittemore, Gary; Liolios, Sotirios; Baskaran, Vijay; Johnson, Jeremy; Lee, Charles; hide

    2013-01-01

    The work described in this report is a continuation of the ACAWS work funded in fiscal year (FY) 2010 under the Exploration Technology Development Program (ETDP), Integrated Systems Health Management (ISHM) project. In FY 2010, we developed requirements for an ACAWS system and vetted the requirements with potential users via a concept demonstration system. In FY 2011, we developed a working prototype of aspects of that concept, with placeholders for technologies to be fully developed in future phases of the project. The objective is to develop general capability to assist operators with system health monitoring and failure diagnosis. Moreover, ACAWS was integrated with the Discrete Controls (DC) task of the Autonomous Systems and Avionics (ASA) project. The primary objective of DC is to demonstrate an electronic and interactive procedure display environment and multiple levels of automation (automatic execution by computer, execution by computer if the operator consents, and manual execution by the operator).

  2. Acoustic Biometric System Based on Preprocessing Techniques and Linear Support Vector Machines.

    PubMed

    del Val, Lara; Izquierdo-Fuente, Alberto; Villacorta, Juan J; Raboso, Mariano

    2015-06-17

    Drawing on the results of an acoustic biometric system based on a MSE classifier, a new biometric system has been implemented. This new system preprocesses acoustic images, extracts several parameters and finally classifies them, based on Support Vector Machine (SVM). The preprocessing techniques used are spatial filtering, segmentation-based on a Gaussian Mixture Model (GMM) to separate the person from the background, masking-to reduce the dimensions of images-and binarization-to reduce the size of each image. An analysis of classification error and a study of the sensitivity of the error versus the computational burden of each implemented algorithm are presented. This allows the selection of the most relevant algorithms, according to the benefits required by the system. A significant improvement of the biometric system has been achieved by reducing the classification error, the computational burden and the storage requirements.

  3. 75 FR 33391 - Amendments to the Protocol Gas Verification Program and Minimum Competency Requirements for Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ...Recent EPA gas audit results indicate that some gas cylinders used to calibrate continuous emission monitoring systems on stationary sources do not meet EPA's performance specification. Reviews of stack test reports in recent years indicate that some stack testers do not properly follow EPA test methods or do not correctly calculate test method results. Therefore, EPA is proposing to amend its Protocol Gas Verification Program (PGVP) and the minimum competency requirements for air emission testing (formerly air emission testing body requirements) to improve the accuracy of emissions data. EPA is also proposing to amend other sections of the Acid Rain Program continuous emission monitoring system regulations by adding and clarifying certain recordkeeping and reporting requirements, removing the provisions pertaining to mercury monitoring and reporting, removing certain requirements associated with a class-approved alternative monitoring system, disallowing the use of a particular quality assurance option in EPA Reference Method 7E, adding an incorporation by reference that was inadvertently left out of the January 24, 2008 final rule, and clarifying the language and applicability of certain provisions.

  4. Dense wavelength division multiplexing devices for metropolitan-area datacom and telecom networks

    NASA Astrophysics Data System (ADS)

    DeCusatis, Casimer M.; Priest, David G.

    2000-12-01

    Large data processing environments in use today can require multi-gigabyte or terabyte capacity in the data communication infrastructure; these requirements are being driven by storage area networks with access to petabyte data bases, new architecture for parallel processing which require high bandwidth optical links, and rapidly growing network applications such as electronic commerce over the Internet or virtual private networks. These datacom applications require high availability, fault tolerance, security, and the capacity to recover from any single point of failure without relying on traditional SONET-based networking. These requirements, coupled with fiber exhaust in metropolitan areas, are driving the introduction of dense optical wavelength division multiplexing (DWDM) in data communication systems, particularly for large enterprise servers or mainframes. In this paper, we examine the technical requirements for emerging nextgeneration DWDM systems. Protocols for storage area networks and computer architectures such as Parallel Sysplex are presented, including their fiber bandwidth requirements. We then describe two commercially available DWDM solutions, a first generation 10 channel system and a recently announced next generation 32 channel system. Technical requirements, network management and security, fault tolerant network designs, new network topologies enabled by DWDM, and the role of time division multiplexing in the network are all discussed. Finally, we present a description of testing conducted on these networks and future directions for this technology.

  5. 23 CFR 771.133 - Compliance with other requirements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.133 Compliance with other requirements. The final EIS or FONSI... other related requirements. If full compliance is not possible by the time the final EIS or FONSI is prepared, the final EIS or FONSI should reflect consultation with the appropriate agencies and provide...

  6. MODIS: Moderate-resolution imaging spectrometer. Earth observing system, volume 2B

    NASA Technical Reports Server (NTRS)

    1986-01-01

    The Moderate-Resolution Imaging Spectrometer (MODIS), as presently conceived, is a system of two imaging spectroradiometer components designed for the widest possible applicability to research tasks that require long-term (5 to 10 years), low-resolution (52 channels between 0.4 and 12.0 micrometers) data sets. The system described is preliminary and subject to scientific and technological review and modification, and it is anticipated that both will occur prior to selection of a final system configuration; however, the basic concept outlined is likely to remain unchanged.

  7. High-level specification of a proposed information architecture for support of a bioterrorism early-warning system.

    PubMed

    Berkowitz, Murray R

    2013-01-01

    Current information systems for use in detecting bioterrorist attacks lack a consistent, overarching information architecture. An overview of the use of biological agents as weapons during a bioterrorist attack is presented. Proposed are the design, development, and implementation of a medical informatics system to mine pertinent databases, retrieve relevant data, invoke appropriate biostatistical and epidemiological software packages, and automatically analyze these data. The top-level information architecture is presented. Systems requirements and functional specifications for this level are presented. Finally, future studies are identified.

  8. Encapsulation of cosmetic active ingredients for topical application--a review.

    PubMed

    Casanova, Francisca; Santos, Lúcia

    2016-02-01

    Microencapsulation is finding increasing applications in cosmetics and personal care markets. This article provides an overall discussion on encapsulation of cosmetically active ingredients and encapsulation techniques for cosmetic and personal care products for topical applications. Some of the challenges are identified and critical aspects and future perspectives are addressed. Many cosmetics and personal care products contain biologically active substances that require encapsulation for increased stability of the active materials. The topical and transdermal delivery of active cosmetic ingredients requires effective, controlled and safe means of reaching the target site within the skin. Preservation of the active ingredients is also essential during formulation, storage and application of the final cosmetic product. Microencapsulation offers an ideal and unique carrier system for cosmetic active ingredients, as it has the potential to respond to all these requirements. The encapsulated agent can be released by several mechanisms, such as mechanical action, heat, diffusion, pH, biodegradation and dissolution. The selection of the encapsulation technique and shell material depends on the final application of the product, considering physical and chemical stability, concentration, required particle size, release mechanism and manufacturing costs.

  9. Medicare program; home health prospective payment system rate update for calendar year 2012. Final rule.

    PubMed

    2011-11-04

    This final rule sets forth updates to the home health prospective payment system (HH PPS) rates, including: the national standardized 60-day episode rates; the national per-visit rates; and the low utilization payment amount (LUPA) under the Medicare PPS for home health agencies effective January 1, 2012. This rule applies a 1.4 percent update factor to the episode rates, which reflects a 1 percent reduction applied to the 2.4 percent market basket update factor, as mandated by the Affordable Care Act. This rule also updates the wage index used under the HH PPS, and further reduces home health payments to account for continued nominal growth in case-mix which is unrelated to changes in patient health status. This rule removes two hypertension codes from the HH PPS case-mix system, thereby requiring recalibration of the case-mix weights. In addition, the rule implements two structural changes designed to decrease incentives to upcode and provide unneeded therapy services. Finally, this rule incorporates additional flexibility regarding face-to-face encounters with providers related to home health care.

  10. Micro-Grids for Colonias (TX)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dean Schneider; Michael Martin; Renee Berry

    2012-07-31

    This report describes the results of the final implementation and testing of a hybrid micro-grid system designed for off-grid applications in underserved Colonias along the Texas/Mexico border. The project is a federally funded follow-on to a project funded by the Texas State Energy Conservation Office in 2007 that developed and demonstrated initial prototype hybrid generation systems consisting of a proprietary energy storage technology, high efficiency charging and inverting systems, photovoltaic cells, a wind turbine, and bio-diesel generators. This combination of technologies provided continuous power to dwellings that are not grid connected, with a significant savings in fuel by allowing powermore » generation at highly efficient operating conditions. The objective of this project was to complete development of the prototype systems and to finalize and engineering design; to install and operate the systems in the intended environment, and to evaluate the technical and economic effectiveness of the systems. The objectives of this project were met. This report documents the final design that was achieved and includes the engineering design documents for the system. The system operated as designed, with the system availability limited by maintenance requirements of the diesel gensets. Overall, the system achieved a 96% availability over the operation of the three deployed systems. Capital costs of the systems were dependent upon both the size of the generation system and the scope of the distribution grid, but, in this instance, the systems averaged $0.72/kWh delivered. This cost would decrease significantly as utilization of the system increased. The system with the highest utilization achieved a capitol cost amortized value of $0.34/kWh produced. The average amortized fuel and maintenance cost was $0.48/kWh which was dependent upon the amount of maintenance required by the diesel generator. Economically, the system is difficult to justify as an alternative to grid power. However, the operational costs are reasonable if grid power is unavailable, e.g. in a remote area or in a disaster recovery situation. In fact, avoided fuel costs for the smaller of the systems in use during this project would have a payback of the capital costs of that system in 2.3 years, far short of the effective system life.« less

  11. Transceiver optics for interplanetary communications

    NASA Astrophysics Data System (ADS)

    Roberts, W. T.; Farr, W. H.; Rider, B.; Sampath, D.

    2017-11-01

    In-situ interplanetary science missions constantly push the spacecraft communications systems to support successively higher downlink rates. However, the highly restrictive mass and power constraints placed on interplanetary spacecraft significantly limit the desired bandwidth increases in going forward with current radio frequency (RF) technology. To overcome these limitations, we have evaluated the ability of free-space optical communications systems to make substantial gains in downlink bandwidth, while holding to the mass and power limits allocated to current state-of-the-art Ka-band communications systems. A primary component of such an optical communications system is the optical assembly, comprised of the optical support structure, optical elements, baffles and outer enclosure. We wish to estimate the total mass that such an optical assembly might require, and assess what form it might take. Finally, to ground this generalized study, we should produce a conceptual design, and use that to verify its ability to achieve the required downlink gain, estimate it's specific optical and opto-mechanical requirements, and evaluate the feasibility of producing the assembly.

  12. Galileo spacecraft power management and distribution system

    NASA Technical Reports Server (NTRS)

    Detwiler, R. C.; Smith, R. L.

    1990-01-01

    The Galileo PMAD (power management and distribution system) is described, and the design drivers that established the final as-built hardware are discussed. The spacecraft is powered by two general-purpose heat-source-radioisotope thermoelectric generators. Power bus regulation is provided by a shunt regulator. Galileo PMAD distributes a 570-W beginning of mission (BOM) power source to a user complement of some 137 load elements. Extensive use of pyrotechnics requires two pyro switching subassemblies. They initiate 148 squibs which operate the 47 pyro devices on the spacecraft. Detection and correction of faults in the Galileo PMAD is an autonomous feature dictated by requirements for long life and reliability in the absence of ground-based support. Volatile computer memories in the spacecraft command and data system and attitude control system require a continuous source of backup power during all anticipated power bus fault scenarios. Power for the Jupiter Probe is conditioned, isolated, and controlled by a Probe interface subassembly. Flight performance of the spacecraft and the PMAD has been successful to date, with no major anomalies.

  13. Rucio, the next-generation Data Management system in ATLAS

    NASA Astrophysics Data System (ADS)

    Serfon, C.; Barisits, M.; Beermann, T.; Garonne, V.; Goossens, L.; Lassnig, M.; Nairz, A.; Vigne, R.; ATLAS Collaboration

    2016-04-01

    Rucio is the next-generation of Distributed Data Management (DDM) system benefiting from recent advances in cloud and ;Big Data; computing to address HEP experiments scaling requirements. Rucio is an evolution of the ATLAS DDM system Don Quixote 2 (DQ2), which has demonstrated very large scale data management capabilities with more than 160 petabytes spread worldwide across 130 sites, and accesses from 1,000 active users. However, DQ2 is reaching its limits in terms of scalability, requiring a large number of support staff to operate and being hard to extend with new technologies. Rucio addresses these issues by relying on new technologies to ensure system scalability, cover new user requirements and employ new automation framework to reduce operational overheads. This paper shows the key concepts of Rucio, details the Rucio design, and the technology it employs, the tests that were conducted to validate it and finally describes the migration steps that were conducted to move from DQ2 to Rucio.

  14. Direct solar heating for Space Station application

    NASA Technical Reports Server (NTRS)

    Simon, W. E.

    1985-01-01

    Early investigations have shown that a large percentage of the power generated on the Space Station will be needed in the form of high-temperature thermal energy. The most efficient method of satisfying this requirement is through direct utilization of available solar energy. A system concept for the direct use of solar energy on the Space Station, including its benefits to customers, technologists, and designers of the station, is described. After a brief discussion of energy requirements and some possible applications, results of selective tradeoff studies are discussed, showing area reduction benefits and some possible configurations for the practical use of direct solar heating. Following this is a description of system elements and required technologies. Finally, an assessment of available contributive technologies is presented, and a Space Shuttle Orbiter flight experiment is proposed.

  15. 4D Dynamic Required Navigation Performance Final Report

    NASA Technical Reports Server (NTRS)

    Finkelsztein, Daniel M.; Sturdy, James L.; Alaverdi, Omeed; Hochwarth, Joachim K.

    2011-01-01

    New advanced four dimensional trajectory (4DT) procedures under consideration for the Next Generation Air Transportation System (NextGen) require an aircraft to precisely navigate relative to a moving reference such as another aircraft. Examples are Self-Separation for enroute operations and Interval Management for in-trail and merging operations. The current construct of Required Navigation Performance (RNP), defined for fixed-reference-frame navigation, is not sufficiently specified to be applicable to defining performance levels of such air-to-air procedures. An extension of RNP to air-to-air navigation would enable these advanced procedures to be implemented with a specified level of performance. The objective of this research effort was to propose new 4D Dynamic RNP constructs that account for the dynamic spatial and temporal nature of Interval Management and Self-Separation, develop mathematical models of the Dynamic RNP constructs, "Required Self-Separation Performance" and "Required Interval Management Performance," and to analyze the performance characteristics of these air-to-air procedures using the newly developed models. This final report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results from this research effort to expand the RNP concept to a dynamic 4D frame of reference.

  16. FreedomCAR - Aftertreatment Subsystem Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisa A. Prentiss

    2005-09-30

    The primary objective of this program was to develop generic aftertreatment technologies applicable for LDV and LDT engines ranging from 55 kW to 200kW, to develop an optimized and integrated aftertreatment system for a LDT (Light Duty Truck) type vehicle, and to demonstrate the technology which will enable light duty diesel engines to meet Federal Tier II regulation with minimum impact on fuel economy. Specifically, the development targets for emissions reduction and fuel injection penalty are given below: (1) NOx conversion efficiency > 90% (hot), > 84% (combined); (2) PM conversion efficiency > 90% (hot), > 84% (combined); (3) Fuelmore » penalty over FTP-75 Less than 5%; and (4) Fuel penalty at Cruise condition Less than 3%. Development of cost-effective, highly efficient diesel exhaust aftertreatment systems in combination with very low engine out emission combustion development are essential elements for realization of Federal Tier II emission standards for Light Duty Trucks and Vehicles. Evaluation of several aftertreatment technologies was completed as part of this program. A combination of Diesel Oxidation Catalyst, NOx Adsorbing Catalyst and Catalyzed Soot Filter was found to provide the levels of conversion efficiency required to achieve the emission targets. While early systems required relatively large catalyst volumes, external dosing, sulfur traps, full bypass configurations and high levels of Platinum metals; the final system is a compact, scalable, flow-through, fully-integrated and engine-managed aftertreatment system capable of commercial application for Light Duty Vehicles and Trucks. NOx adsorber/particulate filter technology is particularly attractive for Light Duty applications due to the lower exhaust flow and temperature requirements as compared to Heavy Duty engines. Despite these strong positive aspects, NOx Adsorbers are challenged by their regeneration requirements and susceptibility to sulfur poisoning and thermal degradation. Capability was developed to regenerate the NOx Adsorber for NOx and SOx as well as the Particulate Filter for soot. This system was fully integrated into a truck and evaluated over the chassis dynamometer for emissions capability and in real-world winter field testing. Durability of the system was evaluated over a variety of accelerated and real-time dynamometer tests. Excellent NOx and PM conversion efficiency was demonstrated, even following 3000 hrs of endurance testing. Unregulated emissions emitted by the system were evaluated as was the fuel penalty associated with the DeNOx and DeSOx regeneration processes. In the final evaluation, the system demonstrated 90% NOx conversion and 99% PM conversion at a 6% fuel penalty over the FTP-75 test cycle. While target fuel penalty levels were demonstrated using full-bypass configuration systems, the cost associated with those systems was prohibitively high and would preclude successful commercialization of the technology. Although the flow-through configuration fell 1% short of the 5% fuel penalty target, the cost of this configuration is such that commercial application is feasible. Cost drivers for the final system configuration were identified and demonstrate areas where future development areas could focus.« less

  17. Cost effective solar hot water system for econo-travel motor hotel located at Hampton, VA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1978-11-01

    This paper gives the final report of a cost effective solar hot water heating system installed on the Econo-Travel Motor Hotel at 2708 Mercury Boulevard, Hampton, Virginia. The description of the system along with the final cost breakdown, performance data and payback time are given. The payback time for the installed system will be approximately four (4) years instead of the 6.65 years estimated for the proposal. The additional savings is due to the reduction in the peak demand charge since the electric hot water heaters are not required to operate at the same time each morning as the dryersmore » used for the laundry. As called for in the proposal to DOE, the success of the system will be determined by the reduction in the utility cost and reduced use of our fossil fuels. The results shown in the hotel's monthly electricity bills indicate that this goal has been accomplished.« less

  18. Spring 2013 Graduate Engineering Internship Summary

    NASA Technical Reports Server (NTRS)

    Ehrlich, Joshua

    2013-01-01

    In the spring of 2013, I participated in the National Aeronautics and Space Administration (NASA) Pathways Intern Employment Program at the Kennedy Space Center (KSC) in Florida. This was my final internship opportunity with NASA, a third consecutive extension from a summer 2012 internship. Since the start of my tenure here at KSC, I have gained an invaluable depth of engineering knowledge and extensive hands-on experience. These opportunities have granted me the ability to enhance my systems engineering approach in the field of payload design and testing as well as develop a strong foundation in the area of composite fabrication and testing for repair design on space vehicle structures. As a systems engineer, I supported the systems engineering and integration team with final acceptance testing of the Vegetable Production System, commonly referred to as Veggie. Verification and validation (V and V) of Veggie was carried out prior to qualification testing of the payload, which incorporated the process of confirming the system's design requirements dependent on one or more validation methods: inspection, analysis, demonstration, and testing.

  19. Spatial operator algebra framework for multibody system dynamics

    NASA Technical Reports Server (NTRS)

    Rodriguez, G.; Jain, Abhinandan; Kreutz, K.

    1989-01-01

    The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.

  20. Spatial Operator Algebra for multibody system dynamics

    NASA Technical Reports Server (NTRS)

    Rodriguez, G.; Jain, A.; Kreutz-Delgado, K.

    1992-01-01

    The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.

Top