Sample records for final work plan

  1. Joint Planning and Development Office Work Plan FY10

    DTIC Science & Technology

    2010-01-01

    IPSA ) Division will make refinements to the NextGen Portfolio Analysis. In addition, IPSA will work with the Department of Defense (DoD) to define and...Submitted Interagency Portfolio and Systems Analysis ( IPSA ) DRAFT DoD Portfolio Analysis Criteria BASELINE DoD Portfolio Analysis Criteria DRAFT...WG Work Plan Review Prototype Capability Selected and Defined CHAs Complete Safety Metrics for IPSA Complete FINAL Prototype Report FINAL

  2. From Welfare to Work: Dynamic Lesson Plans for ESL Learners. Final Report. Fiscal Year 1998-99 [and] From Welfare to Work: Lessons for ESL Learners.

    ERIC Educational Resources Information Center

    Center for Literacy, Inc., Philadelphia, PA.

    This document combines a final project report and the resulting guidebook of 20 lesson plans for English as a second language (ESL) instructors to help learners work within the Temporary Assistance to Needy Families (TANF) system and acquire effective job readiness strategies, choose a career path, and pursue employment. The report describes the…

  3. Preservation Planning Program. Study Report. Iowa State University Library. Final Report.

    ERIC Educational Resources Information Center

    Galejs, John; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Iowa State University, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing plans and procedures for preserving…

  4. 32 CFR 644.8 - Planning and scheduling real estate activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling... Memoranda; determination of final project boundaries; and preliminary real estate work to the point where... estate activities of the Corps are extremely sensitive, since they disrupt the lives of individuals and...

  5. A Preservation Program for the Colorado State University Libraries. The Final Report of the ARL/OMS Preservation Planning Program.

    ERIC Educational Resources Information Center

    Green, Stephen; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the Colorado State University Library (CSUL) working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). Designed to put self-help tools into the hands of library staff responsible for developing plans and procedures…

  6. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland. Focused Feasibility Study, Final Project Work Plan

    DTIC Science & Technology

    1993-10-01

    Disposal Act (SWDA)/Resource Conservation and Recovery Act (RCRA). Jacobs Englnwfng Gmo Inc FINAL PROJECT WORK PLAN Washington Operatvo 8~ Fs 2-551I Date...shaded map of contaminated areas defined by chemical data, more than one map may be consructed f special and grapk cons *tft ame encountered. Results...that a Siophysical c ao p Pro rma down the axis or Beah PointS using geophysic teehnozoglosts that are •vi subsurface hyd&rosAdgraphic cmal beneath

  7. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  8. WORK PLAN FOR COMPLETING A TECHNOLOGY ASSESSMENT OF WESTERN ENERGY RESOURCE DEVELOPMENT

    EPA Science Inventory

    This is a work plan for completing the final phase of a three year technology assessment of the development of six energy resources (coal, geothermal, natural gas, oil, oil shale, and uranium) in eight western states (Arizona, Colorado, Montana, New Mexico, North and South Dakota...

  9. Feasibility Study for Low Drag Acoustic Liners Final Report

    NASA Technical Reports Server (NTRS)

    Riedel, Brian; Wu, Jackie

    2017-01-01

    This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

  10. For Work-Force Training, a Plan to Give College Credit Where It's Due

    ERIC Educational Resources Information Center

    Sander, Libby

    2008-01-01

    After nearly three years of planning, Ohio's higher-education officials are finalizing an ambitious program to grant college credit for some technical courses offered at the state's adult-education centers. The program, called the Career-Technical Credit Transfer, is the latest in a string of state efforts to more closely link work-force training…

  11. Career Planning Support System Program (CPSS). Final Report.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    Intended for the developmental practitioner, this report examines literature produced by the Career Planning Support System dealing with career guidance in four major areas: minority youth; women; transition from school to work; and program planning and evaluation. The area of minority youth includes a review of literature on: educational and…

  12. Technology Partnership Organization: Quality Work Force Planning in East Texas. Final Report for Project Year 1990-1991.

    ERIC Educational Resources Information Center

    Fabac, John N.

    The Technology Partnership Organization (TPO) is one of 24 Quality Work Force Planning (QWFP) entities in Texas. The TPO met its objectives through a variety of activities, including the following: (1) establishing a QWFP committee for the region; (2) providing an inventory of key regional industries with the greatest job opening potential and…

  13. Final Work Plan: Targeted Investigation at York, Nebraska

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The targeted investigation at York will be implemented in phases, so that data collected and interpretations developed at each stage of the program can be evaluated to guide subsequent phases most effectively. Section 2 of this Work Plan presents a brief overview of the York site, its geologic and hydrologic setting, and the previous CCC/USDA investigations. Section 3, outlines the proposed technical program for the targeted investigation, and Section 4 describes the investigative methods to be employed. A community relations plan is in Section 5, and Section 6 includes health and safety information. In addition to this site-specific Work Plan,more » the Master Work Plan (Argonne 2002) developed by Argonne for CCC/USDA investigations in Nebraska should be consulted for complete details of the methods and procedures to be used at York.« less

  14. Nebraska State Plan Career Education Project. Final Performance Report for Period Ending June 30, 1977.

    ERIC Educational Resources Information Center

    Nebraska State Dept. of Education, Lincoln.

    The Nebraska state career education plan was developed to assist individuals in developing essential educational and career skills for responsible functioning. The plan, linking the school and work world, extends chronologically: elementary level--career awareness, middle/junior high school level--career exploration, and senior high school…

  15. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...

  16. Making a successful transition to cash balance. Using employee choice and financial education.

    PubMed

    Scahill, P; Wiley, P

    2000-01-01

    As employee work patterns change, the need for flexible plan design has increased. Hybrid plans such as cash balance plans offer a plan design variation that incorporates elements of the traditional defined benefit plan as well as those of defined contribution plans. This article examines plan design trends and discusses both negative and positive reactions to those trends. Finally, the solution of offering choice to plan participants is suggested, and the issues that must be considered are discussed.

  17. WORKSHOP ON ORGANIZATION AND OPERATION OF COOPERATIVE WORK EXPERIENCE PROGRAMS IN TRADE AND INDUSTRIAL EDUCATION. (TUSKEGEE INSTITUTE, AUGUST 14-SEPTEMBER 1, 1967). FINAL REPORT.

    ERIC Educational Resources Information Center

    HARRIS, JAMES N.; SHERARD, AUSTELL O.

    THIRTY-NINE TRADE AND INDUSTRIAL AND VOCATIONAL TECHNICAL TEACHERS AND SUPERVISORS FROM 19 STATES PARTICIPATED IN A WORKSHOP TO PLAN AND EXECUTE A COMPREHENSIVE EXAMINATION AND EVALUATION OF THE COOPERATIVE WORK EXPERIENCE PLAN OF EDUCATION RELATIVE TO TRADE AND INDUSTRIAL EDUCATION. THE WORKSHOP ORGANIZATION INCLUDED CONSULTANT PRESENTATIONS,…

  18. Working draft of the FDA GMP final rule (Part I).

    PubMed

    Donawa, M E

    1995-10-01

    On 24 July 1995, the US Food and Drug Administration (FDA) published a notice of availability of a working draft of a final rule for new good manufacturing practice (GMP) regulations for medical devices. The new regulations could be in force by late 1996. This is the first of a two-part series of articles discussing key provisions of the working draft and their importance to companies marketing or planning to market devices in the US.

  19. Final Inventory Work-Off Plan for ORNL transuranic wastes (1986 version)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dickerson, L.S.

    1988-05-01

    The Final Inventory Work-Off Plan (IWOP) for ORNL Transuranic Wastes addresses ORNL's strategy for retrieval, certification, and shipment of its stored and newly generated contact-handled (CH) and remote-handled (RH) transuranic (TRU) wastes to the Waste Isolation Pilot Plant (WIPP), the proposed geologic repository near Carlsbad, New Mexico. This document considers certification compliance with the WIPP waste acceptance criteria (WAC) and is consistent with the US Department of Energy's Long-Range Master Plan for Defense Transuranic Waste Management. This document characterizes Oak Ridge National Laboratory's (ORNL's) TRU waste by type and estimates the number of shipments required to dispose of it; describesmore » the methods, facilities, and systems required for its certification and shipment; presents work-off strategies and schedules for retrieval, certification, and transportation; discusses the resource needs and additions that will be required for the effort and forecasts costs for the long-term TRU waste management program; and lists public documentation required to support certification facilities and strategies. 22 refs., 6 figs., 10 tabs.« less

  20. 75 FR 11107 - Revision of Land Management Plan for the George Washington National Forest, Virginia and West...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    ... additional information. Finally, this notice briefly describes the applicable planning rule and how work done..., or recorded at past public meetings, related to the revision of the GW Forest Plan since 2007 will be..., environmental stresses and threats, societal demands and our current state of scientific knowledge. Also since...

  1. [Endodontically treated teeth. Success--failure. Endorestorative treatment plan].

    PubMed

    Zabalegui, B

    1990-01-01

    More and more often the general dentist is finding the presence of endodontically treated teeth during his treatment planning procedure. He has to ask himself if the endo-treated tooth functions and will continue to function function successfully, when deciding which final endo-restorative procedure to apply. For this reason the dentist or the endodontist with whom he works should clinically evaluate these teeth, establish a diagnostic criteria of their success or failure and a treatment plan according to the prognosis. The purpose of this article is to offer an organized clinical view of the steps to follow when evaluating an endodontically treated tooth and how to establish a final endo-restorative plan.

  2. International Workshop on Communications in Family Planning Programs (Teheran, June 6-18, 1970). Final Report.

    ERIC Educational Resources Information Center

    Blake, Robert R., Ed.; Wolfe, Suzanne, R., Ed.

    This report presents some of the proceedings of a workshop on communications in family planning programs held in Teheran, Iran. A total of 82 participants from 15 Mid-Eastern and African countries attended. The purpose of the workshop was to assist each country to prepare a work plan for information and education activities related to population…

  3. Work zone design and operation enhancements : final report, March 2010.

    DOT National Transportation Integrated Search

    2010-02-01

    Oregon Department of Transportation contractors are required to implement Traffic Control Plans (TCPs) to protect and direct traffic through work zones. The design and implementation of TCPs have shown variation from project-to-project across the Sta...

  4. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  5. Final Report - LAW Envelope C Glass Formulation Testing to Increase Waste Loading, VSL-05R5900-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Pegg, I. L.; Matlack, K. S.

    2013-12-03

    This report describes the results of testing specified by Test Plan VSL-05R5900-1 Rev.0. The work was performed in compliance with the quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  6. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  7. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  8. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  9. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  10. 40 CFR 35.9065 - Limitations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE Financial Assistance for the National Estuary Program § 35.9065 Limitations. (a) Management... the estuary for which the work is proposed. (b) Elements of annual workplans. Annual Work Plans to be prepared by estuary Management Conferences must be reviewed by the Regional Administrator before final...

  11. Investigation into avian mortality in the Playa Lakes region of southeastern New Mexico: Final Report - June 1997

    USGS Publications Warehouse

    Dein, F. Joshua; Baeten, Laurie A.; Moore, Melody K.; Samuel, Michael D.; Miller, Paul D.; Murphy, Christopher; Sissler, Steven; Jeske, Clinton W.; Jehl, Joseph R.; Yaeger, J. S.; Bauer, B.; Mahoney, Shiela A.

    1997-01-01

    This Final Report is a review of work on a cooperative study undertaken by the USGS Biological Resources Division's National Wildlife Health Center (NWHC) and National Wetlands Research Center (NWRC; formerly the Southern Science Center) from 1994 through 1997. The study was initiated at the request of the Bureau of Land Management (BLM), through a request to the former National Biological Service. The Southeastern New Mexico Playa Lakes Coordinating Committee (SENMPLCC) played an important role in outlining the research needs. The initial Study Plan document, which outlines the background, objectives and methods for the first two years is available as Appendix 1. A letter indicating modifications to the Study Plan was sent to the SENMPLCC chair on April 25,1995, and is Appendix 2. An Interim Report, covering this work was completed and submitted in September 1995. The Literature Review section of the study was completed and presented to SENMPLCC in August, 1995. Following SENMPLCC review, NWHC was asked to develop a series of questions that could be posed from information gained in the initial phase (Appendix 3). The NWHC and NWRC were then directed to begin work to answer the top three questions, within the available fiscal resources. NWRC could continue with work outlined under the original Study Plan (Appendix 1), however an additional Study Plan for experiments performed by NWHC and collaborators and is available as Appendix 4.

  12. FY 1987 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less

  13. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  14. Final Work Plan for CO2 Sparging Proof of Concept Test, LCP Chemical Site

    EPA Pesticide Factsheets

    September 11, 2012 plan to address concerns on a pilot test of carbon dioxide sparging to neutralize pH and reduce the density of the Caustic Brine Pool (CBP) at the LCP Chemicals Superfund Site, GA. Region ID: 04 DocID: 10903388, DocDate: 09-11-2012

  15. Planned and Unplanned Aspects of Occupational Choices by Youth. Final Report.

    ERIC Educational Resources Information Center

    Ellis, Robert A.; And Others

    This document includes reports on four subjects relevant to planned and unplanned aspects of occupational choices by youth. (1) "Toward a Morphology of Occupational Choice," by Robert A. Ellis and others, discusses intrinsic features and extrinsic rewards of work, extra-role considerations, and goal perception as major influences on occupational…

  16. Omaha District Final Cultural Resource Site Monitoring Plan

    DTIC Science & Technology

    2014-06-01

    water or other potentially dangerous risks such as snakes , insects, and poisonous plants may also be encountered. The work also requires regular...such as snakes , insects, and poisonous plants may also be encountered. The work also requires regular physical exertion such as bending and walking

  17. Final Report - LAW Envelope A and B Glass Formulations Testing in Increase Waste Loading. VSL-06R6900-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Joseph, I.; Muller, I. S.

    This report describes the results of testing specified by the Test Plan VSL-06R6900-1 Rev 0. The work was performed in compliance with quality assurance requirements specified in the Test Plan. Results required by the Test Plan are reported. The test results and this report have been reviewed for correctness, technical adequacy, completeness, and accuracy.

  18. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  19. Temporal planning for transportation planning and scheduling

    NASA Technical Reports Server (NTRS)

    Frederking, Robert E.; Muscettola, Nicola

    1992-01-01

    In this paper we describe preliminary work done in the CORTES project, applying the Heuristic Scheduling Testbed System (HSTS) to a transportation planning and scheduling domain. First, we describe in more detail the transportation problems that we are addressing. We then describe the fundamental characteristics of HSTS and we concentrate on the representation of multiple capacity resources. We continue with a more detailed description of the transportation planning problem that we have initially addressed in HSTS and of its solution. Finally we describe future directions for our research.

  20. Post-Doctoral Fellowship for Merton S. Krause. Final Report.

    ERIC Educational Resources Information Center

    Jackson, Philip W.

    The final quarter of Krause's fellowship year was spent in completing his interviews with political socialization researchers in the eastern United States and his work on methodological problems. Krause also completed a long essay on the nature and implications of the "matrix perspective" for research planning, pursued his study of measurement…

  1. Final definition and preliminary design study for the initial atmospheric cloud physics laboratory, a Spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The following areas related to the final definition and preliminary design study of the initial atmospheric cloud physics laboratory (ACPL) were covered: (1) proposal organization, personnel, schedule, and project management, (2) proposed configurations, (3) study objectives, (4) ACPL experiment program listing and description, (5) mission/flight flexibility and modularity/commonality, (6) study plan, and (7) description of following tasks: requirement analysis and definition task flow, systems analysis and trade studies, subsystem analysis and trade studies, specifications and interface control documents, preliminary design task flow, work breakdown structure, programmatic analysis and planning, and project costs. Finally, an overview of the scientific requirements was presented.

  2. Building the IOOS data management subsystem

    USGS Publications Warehouse

    de La Beaujardière, J.; Mendelssohn, R.; Ortiz, C.; Signell, R.

    2010-01-01

    We discuss progress to date and plans for the Integrated Ocean Observing System (IOOS??) Data Management and Communications (DMAC) subsystem. We begin by presenting a conceptual architecture of IOOS DMAC. We describe work done as part of a 3-year pilot project known as the Data Integration Framework and the subsequent assessment of lessons learned. We present work that has been accomplished as part of the initial version of the IOOS Data Catalog. Finally, we discuss near-term plans for augmenting IOOS DMAC capabilities.

  3. Improving health sector travel.

    PubMed

    Hurdle, David; Davis, Adrian

    2004-10-01

    Preventing ill health and obesity and building more physical activity into our daily lives have never been so high on the agenda, and the way we travel can help. Many workplaces and schools are drawing up travel plans, with the aims usually to minimise car use and encourage healthier and more environmentally friendly travel. The Transport White Paper of 1998 advocated travel plans and singled out hospitals for action. Travel plans continue to be a focus within the latest Transport White Paper, launched in July 2004. This article covers various prompts to the health sector to implement travel plans. It addresses issues and concerns facing NHS Trusts, the practical things Trusts can do, and the increasing amount of good practice available. Finally, it demonstrates that travel plans can work, and are working, in the health sector.

  4. [Role of occupational rehabilitation therapy in returning to work: experimental experience].

    PubMed

    Bazzini, Giacomo; Panigazzil, Monica; Prestifilippo, Elena; Capodaglio, Edda Maria; Candura, Stefano M; Scafa, Fabrizio; Nuccio, Carla; Cortese, Giovanni; Matarrese, Maria Rosaria; Miccio, Antonella

    2014-01-01

    The experimental experience is the result of combining cultural, clinical and scientific interest in rehabilitative, occupational and forensic mnedicine and in ergonomics. It deals with the rehabilitation and return at work of patients with physical disabilities caused by occupational trauma or disease. The programme described starts with a selection by INAIL and involves with an outpatient surgery inclusion. It is composed of: preliminary physical examination, functional assessment, the formulation of a rehabilitation plan and its successive implementation. At the end of the evaluation plan, there is a final assessment to identify outcome indicators and residual functional and work capacity.

  5. A Center on Effective Secondary Schools. Final Report of Planning Grant.

    ERIC Educational Resources Information Center

    Newmann, Fred M.; Smith, Marshall S.

    Work being conducted by the Wisconsin Center for Education Research on the topic of effective secondary schools is described. The first section of this paper contains a summary of planning activities. A 5-year proposal for the Center on Effective Secondary Schools is described as well as an evaluation of that proposal. The second section presents…

  6. Preservation at Stony Brook. Preservation Planning Program. Study Report.

    ERIC Educational Resources Information Center

    Cook, Donald C.; And Others

    This final report is a product of a Preservation Planning Program (PPP) self-study conducted by the State University of New York (SUNY), Stony Brook, working with the Association of Research Libraries' (ARL) Office of Management Studies (OMS). The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  7. A College Marketing Plan That's Working: Final Report. CASE Certification Program in Executive Management.

    ERIC Educational Resources Information Center

    Noll, Gayle

    In response to a 3% decline in fall 1977 enrollments, Odessa College developed and implemented a comprehensive marketing program. After initial planning, a marketing task force and nine mini-task forces were created to deal with the topics of community economic markets, community cultural markets, student retention, student recruitment techniques,…

  8. Dr. King's Dream. [Lesson Plan].

    ERIC Educational Resources Information Center

    National Endowment for the Humanities (NFAH), Washington, DC.

    This lesson plan teaches students about the life and work of Martin Luther King, Jr. Students listen to a brief biography, view photographs of the March on Washington, hear a portion of King's "I Have a Dream" speech, and discuss what King's words mean to them. Finally, they will create picture books about their own dreams of freedom for…

  9. Research on the Intensity Analysis and Result Visualization of Construction Land in Urban Planning

    NASA Astrophysics Data System (ADS)

    Cui, J.; Dong, B.; Li, J.; Li, L.

    2017-09-01

    As a fundamental work of urban planning, the intensity analysis of construction land involves many repetitive data processing works that are prone to cause errors or data precision loss, and the lack of efficient methods and tools to visualizing the analysis results in current urban planning. In the research a portable tool is developed by using the Model Builder technique embedded in ArcGIS to provide automatic data processing and rapid result visualization for the works. A series of basic modules provided by ArcGIS are linked together to shape a whole data processing chain in the tool. Once the required data is imported, the analysis results and related maps and graphs including the intensity values and zoning map, the skyline analysis map etc. are produced automatically. Finally the tool is installation-free and can be dispatched quickly between planning teams.

  10. Individual Pesticides in Registration Review

    EPA Pesticide Factsheets

    You can used the Chemical Search database to search pesticides by chemical name and find their registration review dockets, along with Work Plans, risk assessments, interim and final decisions, tolerance rules, and cancellation actions.

  11. Modeling, Simulation, and Analysis for State and Local Emergency Planning and Response: Concept of Operations

    DTIC Science & Technology

    2009-01-01

    must be considered for each threat. The Department of Homeland Security (DHS) has defined 15 National Planning Scenarios ( NPSs ), along with a...considered how to incorporate the 15 NPSs and the Target Capabilities List developed by DHS. Finally, we considered the work being done by Dr. Charles...suite of models and other tools hampers effective planning and re- sponse for all hazards, including the NPSs . The ES community has many meth- ods

  12. Struggling Writers' Use of iPad Art and Text Apps for Story Writing

    ERIC Educational Resources Information Center

    Dunn, Michael

    2015-01-01

    Many children struggle with writing. Idea generation, planning, organizing ideas, editing, and encoding a final text all have a part in a child's producing a publishable copy. Part of the challenge for these students is how working memory can be overloaded when initially planning and writing at the same time. To address this issue, the author…

  13. School Resegregation: Residential and School Process Study. A Collaborative Leadership Planning/Training Project, Third Year: 1978-79. Final Report.

    ERIC Educational Resources Information Center

    Williams, Georgia

    This report summarizes the work undertaken by the Berkeley Unified School District's (BUSD) project to define a collaborative leadership planning/training model to combat school resegregation. In 1972, four years after full desegregation, the BUSD experienced a marked shift in the school population and its distribution. In 1976, the BUSD committed…

  14. From Constructs to Measures: Finalizing the Common Core. The Project on State-Level Child Outcomes.

    ERIC Educational Resources Information Center

    Child Trends, Inc., Washington, DC.

    The U.S. Department of Health and Human Services' Office of Planning, Research, and Evaluation at the Administration for Children and Families, and the Office of the Assistant Secretary for Planning and Evaluation, are working together with states and other groups to improve the measurement of child outcomes in state welfare evaluations and in…

  15. Vapor Intrusion Characterization Report (Revision 1.0)

    EPA Pesticide Factsheets

    Vapor Intrusion Characterization Report (Revision 1) - February 5, 2015: This report, which was approved by the EPA on February 18, 2015, documents the results from implementation of the Final Vapor Intrusion Characterization Work Plan.

  16. VTrans climate change action plan

    DOT National Transportation Integrated Search

    2008-06-01

    VTrans is working closely with other state agencies, including the Agency of Natural Resources (ANR) to review and implement the transportation-related recommendations from the 2007 Governors Commission on Climate Change (GCCC) final report. The r...

  17. FINAL REPORT FOR THE REDUCTION OF CHROME (VI) TO CHROME (III) IN THE SECONDARY WASTE STREAM OF THE EFFLUENT TREATMENT FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN JB; GUTHRIE MD

    2008-08-29

    This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.

  18. Nine steps towards a better water meter management.

    PubMed

    Arregui, F J; Soriano, J; Cabrera, E; Cobacho, R

    2012-01-01

    The paper provides a comprehensive perspective of the critical aspects to be taken into account when planning the long-term management of water meters in a utility. In order to facilitate their quick understanding and practical implementation, they have been structured into nine steps. Ranging from an initial audit up to the final periodic meter replacement planning, these steps cover three aspects of the problem - field work, laboratory work and management tasks; and each one is developed in detail paying attention to the particular data needed and noting the practical outcome it will yield.

  19. Planning the Transition to Long-Term Stewardship for the River Corridor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cearlock, C.S.; Lerch, J.A.; Sands, J.P.

    2007-07-01

    Long-term stewardship refers to all activities necessary to ensure protection of human health and the environment following completion of remediation, disposal, or stabilization of a site or a portion of a site. Efforts to establish the proposed approach and criteria to be met for long-term stewardship in the river corridor of the Hanford Site in Richland, Washington, are currently being established and a draft plan is expected to be completed in mid-2007 to facilitate planning for a smooth and seamless transition to long-term stewardship. Once the initial criteria have been established, supporting information will be gathered as the work proceeds.more » Near the end of cleanup actions under the River Corridor Closure Contract, these criteria will be finalized in a long-term stewardship plan that documents how the criteria have been met. In addition, the final long-term stewardship plan will also contain a proposed Finding of Suitability to Transfer in accordance with Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Section 120(h) [1]. This final long-term stewardship plan will provide the foundation for post-River Corridor Closure Contract and management activities in the river corridor pending actual property transfer from the U.S. Department of Energy. (authors)« less

  20. Final Technical Report on the Institute for Advanced Study in Student Personnel Work.

    ERIC Educational Resources Information Center

    Callis, Robert

    This document reports the planning, implementation, and evaluation of a 9-month institute held at the University of Missouri-Columbia to prepare participants (approximately 20) for leadership positions in student personnel work at junior colleges and technical institutes. The following aspects of the instructional program are discussed and…

  1. New Directions in Library and Information Science Education. Final Report. Volume 2.6: Database Distributor/Service Professional Competencies.

    ERIC Educational Resources Information Center

    Griffiths, Jose-Marie; And Others

    This document contains validated activities and competencies needed by librarians working in a database distributor/service organization. The activities of professionals working in database distributor/service organizations are listed by function: Database Processing; Customer Support; System Administration; and Planning. The competencies are…

  2. 77 FR 53225 - National Earthquake Prediction Evaluation Council (NEPEC)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... meeting, the Council will receive briefings on: ongoing and planned work with social and behavioral... below), and will be posted to the web site (above) when finalized. In order to ensure sufficient seating...

  3. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    PubMed Central

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-01-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively. PMID:27271840

  4. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment.

    PubMed

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S; Phoon, Sin Ye

    2016-06-07

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  5. Virtual Planning, Control, and Machining for a Modular-Based Automated Factory Operation in an Augmented Reality Environment

    NASA Astrophysics Data System (ADS)

    Pai, Yun Suen; Yap, Hwa Jen; Md Dawal, Siti Zawiah; Ramesh, S.; Phoon, Sin Ye

    2016-06-01

    This study presents a modular-based implementation of augmented reality to provide an immersive experience in learning or teaching the planning phase, control system, and machining parameters of a fully automated work cell. The architecture of the system consists of three code modules that can operate independently or combined to create a complete system that is able to guide engineers from the layout planning phase to the prototyping of the final product. The layout planning module determines the best possible arrangement in a layout for the placement of various machines, in this case a conveyor belt for transportation, a robot arm for pick-and-place operations, and a computer numerical control milling machine to generate the final prototype. The robotic arm module simulates the pick-and-place operation offline from the conveyor belt to a computer numerical control (CNC) machine utilising collision detection and inverse kinematics. Finally, the CNC module performs virtual machining based on the Uniform Space Decomposition method and axis aligned bounding box collision detection. The conducted case study revealed that given the situation, a semi-circle shaped arrangement is desirable, whereas the pick-and-place system and the final generated G-code produced the highest deviation of 3.83 mm and 5.8 mm respectively.

  6. 75 FR 22706 - Defense Federal Acquisition Regulation Supplement; Service Contract Surveillance (DFARS Case 2008...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ...DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to ensure that the requirement for a quality assurance surveillance plan is addressed for each contract with a dollar value above the simplified acquisition threshold, and that contracts for services have appropriate performance management or surveillance plans prepared for the work being performed under the contract.

  7. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1994 through November 30, 1995. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  8. Community and facility-level engagement in planning and budgeting for the government health sector--a district perspective from Kenya.

    PubMed

    O'Meara, Wendy Prudhomme; Tsofa, Benjamin; Molyneux, Sassy; Goodman, Catherine; McKenzie, F Ellis

    2011-03-01

    Health systems reform processes have increasingly recognized the essential contribution of communities to the success of health programs and development activities in general. Here we examine the experience from Kilifi district in Kenya of implementing annual health sector planning guidelines that included community participation in problem identification, priority setting, and planning. We describe challenges in the implementation of national planning guidelines, how these were met, and how they influenced final plans and budgets. The broad-based community engagement envisaged in the guidelines did not take place due to the delay in roll out of the Ministry of Health-trained community health workers. Instead, community engagement was conducted through facility management committees, though in a minority of facilities, even such committees were not involved. Some overlap was found in the priorities highlighted by facility staff, committee members and national indicators, but there were also many additional issues raised by committee members and not by other groups. The engagement of the community through committees influenced target and priority setting, but the emphasis on national health indicators left many local priorities unaddressed by the final work plans. Moreover, it appears that the final impact on budgets allocated at district and facility level was limited. The experience in Kilifi highlights the feasibility of engaging the community in the health planning process, and the challenges of ensuring that this engagement feeds into consolidated plans and future implementation. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  9. In Final Months, Education Department Seeks Teachers' Advice

    ERIC Educational Resources Information Center

    Hoff, David J.; Keller, Bess

    2008-01-01

    This article reports that by next fall--only months before she leaves office--U.S. Secretary of Education Margaret Spellings plans to have five teachers on her staff and set up a group of 20 ad hoc advisers still working in classrooms. Under the Teaching Ambassador Fellowship program the teachers would work at the department for one year starting…

  10. Usefulness and engagement with a guided workbook intervention (WorkPlan) to support work related goals among cancer survivors.

    PubMed

    Schumacher, Lauren; Armaou, Maria; Rolf, Pauline; Sadhra, Steven; Sutton, Andrew John; Zarkar, Anjali; Grunfeld, Elizabeth A

    2017-10-04

    Returning to work after cancer is associated with improved physical and psychological functioning, but managing this return can be a challenging process. A workbook based intervention (WorkPlan) was developed to support return-to-work among cancer survivors. The aim of this study was to explore how participants using the workbook engaged with the intervention and utilised the content of the intervention in their plan to return-to-work. As part of a feasibility randomised controlled trial, 23 participants from the intervention group were interviewed 4-weeks post intervention. Interviews focussed on intervention delivery and data was analysed using Framework analysis. Participants revealed a sense of empowerment and changes in their outlook as they transitioned from patient to employee, citing the act of writing as a medium for creating their own return-to-work narrative. Participants found the generation of a return-to-work plan useful for identifying potential problems and solutions, which also served as a tool for aiding discussion with the employer on return-to-work. Additionally, participants reported feeling less uncertain and anxious about returning to work. Timing of the intervention in coordination with ongoing cancer treatments was crucial to perceived effectiveness; participants identified the sole or final treatment as the ideal time to receive the intervention. The self-guided workbook supports people diagnosed with cancer to build their communication and planning skills to successfully manage their return-to-work. Further research could examine how writing plays a role in this process. Current Controlled Trials ISRCTN56342476 . Retrospectively registered 14 October 2015.

  11. B Plant Complex preclosure work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ADLER, J.G.

    1999-02-02

    This preclosure work plan describes the condition of the dangerous waste treatment storage, and/or disposal (TSD) unit after completion of the B Plant Complex decommissioning Transition Phase preclosure activities. This description includes waste characteristics, waste types, locations, and associated hazards. The goal to be met by the Transition Phase preclosure activities is to place the TSD unit into a safe and environmentally secure condition for the long-term Surveillance and Maintenance (S&M) Phase of the facility decommissioning process. This preclosure work plan has been prepared in accordance with Section 8.0 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement)more » (Ecology et al. 1996). The preclosure work plan is one of three critical Transition Phase documents, the other two being: B Plant End Points Document (WHC-SD-WM-TPP-054) and B Plant S&M plan. These documents are prepared by the U.S. Department of Energy, Richland Operations Office (DOE-RL) and its contractors with the involvement of Washington State Department of Ecology (Ecology). The tanks and vessels addressed by this preclosure work plan are limited to those tanks end vessels included on the B Plant Complex Part A, Form 3, Permit Application (DOE/RL-88-21). The criteria for determining which tanks or vessels are in the Part A, Form 3, are discussed in the following. The closure plan for the TSD unit will not be prepared until the Disposition Phase of the facility decommissioning process is initiated, which follows the long-term S&M Phase. Final closure will occur during the Disposition Phase of the facility decommissioning process. The Waste Encapsulation Storage Facility (WESF) is excluded from the scope of this preclosure work plan.« less

  12. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  13. Kansas State Plan for Career Education. Final Report. F.Y. 1978, July 1, 1977--September 30, 1978.

    ERIC Educational Resources Information Center

    InterAmerica Research Associates, Lawrence, KS.

    A two-year project was undertaken in Kansas to develop a five-year plan for career education in the state. The first year resulted in (1) a brief summary of previous work done in Kansas since the introduction of the career education concept, (2) establishment of a definition of career education, (3) a description of various resources that can be…

  14. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  15. Cost and Schedule Analytical Techniques Development: Option 1

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the base contract year from December 1, 1995 through November 30, 1996. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical services and products to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) and the Program Plans and Requirements Officer (PPO2). Detailed Monthly Progress Reports were submitted to MSFC in accordance with the contract's Statement of Work Section IV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at a higher level.

  16. Status of the Consolidation of the LHC Superconducting Magnets and Circuits

    NASA Astrophysics Data System (ADS)

    Tock, J. Ph; Atieh, S.; Bodart, D.; Bordry, F.; Bourcey, N.; Cruikshank, P.; Dahlerup-Petersen, K.; Dalin, J. M.; Garion, C.; Musso, A.; Ostojic, R.; Perin, A.; Pojer, M.; Savary, F.; Scheuerlein, C.

    2014-05-01

    The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13 kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The final design of the consolidated splices is recalled. 1695 interconnections containing 10 170 splices have to be opened. In addition to the work on the 13 kA splices, the other interventions performed during the first long shut-down on all the superconducting circuits are described. All this work has been structured in a project, gathering about 280 persons. The opening of the interconnections started in April 2013 and consolidation works are planned to be completed by August 2014. This paper describes first the preparation phase with the building of the teams and the detailed planning of the operation. Then, it gives feedback from the worksite, namely lessons learnt and adaptations that were implemented, both from the technical and organizational points of view. Finally, perspectives for the completion of this consolidation campaign are given.

  17. TSCA Work Plan Chemical Risk Assessment N-Methylpyrrolidone: Paint Stripper Use

    EPA Pesticide Factsheets

    This final assessment for N-Methylpyrrolidone identified acute and chronic health risks to people, particularly pregnant women and women of childbearing age, who who are exposed to paint and coating removal products containing high concentrations of NMP.

  18. 7 CFR 622.2 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., water quality management, ground water supply, agricultural pollution control, and other water management. (d) After a final plan for works of improvement is agreed upon between NRCS and the sponsors and... proper utilization of land, flood prevention, agricultural water management including irrigation and...

  19. Enforcement Requirements For High-Occupancy Vehicle Facilities, Final Report

    DOT National Transportation Integrated Search

    1995-02-01

    This handbook is designed for technical staff as an instructional guide to the 1990 Census Transportation Planning Package (CTPP) and its potential uses. the CTPP contains 1990 social and economic data by place of residence, place of work, and journe...

  20. Highly Efficient Training, Refinement, and Validation of a Knowledge-based Planning Quality-Control System for Radiation Therapy Clinical Trials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Nan; Carmona, Ruben; Sirak, Igor

    Purpose: To demonstrate an efficient method for training and validation of a knowledge-based planning (KBP) system as a radiation therapy clinical trial plan quality-control system. Methods and Materials: We analyzed 86 patients with stage IB through IVA cervical cancer treated with intensity modulated radiation therapy at 2 institutions according to the standards of the INTERTECC (International Evaluation of Radiotherapy Technology Effectiveness in Cervical Cancer, National Clinical Trials Network identifier: 01554397) protocol. The protocol used a planning target volume and 2 primary organs at risk: pelvic bone marrow (PBM) and bowel. Secondary organs at risk were rectum and bladder. Initial unfiltered dose-volumemore » histogram (DVH) estimation models were trained using all 86 plans. Refined training sets were created by removing sub-optimal plans from the unfiltered sample, and DVH estimation models… and DVH estimation models were constructed by identifying 30 of 86 plans emphasizing PBM sparing (comparing protocol-specified dosimetric cutpoints V{sub 10} (percentage volume of PBM receiving at least 10 Gy dose) and V{sub 20} (percentage volume of PBM receiving at least 20 Gy dose) with unfiltered predictions) and another 30 of 86 plans emphasizing bowel sparing (comparing V{sub 40} (absolute volume of bowel receiving at least 40 Gy dose) and V{sub 45} (absolute volume of bowel receiving at least 45 Gy dose), 9 in common with the PBM set). To obtain deliverable KBP plans, refined models must inform patient-specific optimization objectives and/or priorities (an auto-planning “routine”). Four candidate routines emphasizing different tradeoffs were composed, and a script was developed to automatically re-plan multiple patients with each routine. After selection of the routine that best met protocol objectives in the 51-patient training sample (KBP{sub FINAL}), protocol-specific DVH metrics and normal tissue complication probability were compared for original versus KBP{sub FINAL} plans across the 35-patient validation set. Paired t tests were used to test differences between planning sets. Results: KBP{sub FINAL} plans outperformed manual planning across the validation set in all protocol-specific DVH cutpoints. The mean normal tissue complication probability for gastrointestinal toxicity was lower for KBP{sub FINAL} versus validation-set plans (48.7% vs 53.8%, P<.001). Similarly, the estimated mean white blood cell count nadir was higher (2.77 vs 2.49 k/mL, P<.001) with KBP{sub FINAL} plans, indicating lowered probability of hematologic toxicity. Conclusions: This work demonstrates that a KBP system can be efficiently trained and refined for use in radiation therapy clinical trials with minimal effort. This patient-specific plan quality control resulted in improvements on protocol-specific dosimetric endpoints.« less

  1. Final Report - DuraMelter 100 Tests to Support LAW Glass Formulation Correlation Development, VSL-06R6480-1, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Muller, I. S.; Gong, W.

    2013-12-03

    This report describes the results of work and testing specified by Test Specifications 24590-LAW-TSP-RT-04-004, Rev. 0, Test Plans VSL-05T5480-1, Rev. 0 and Text Exceptions 24590-LAW-TEF-RT-05-00002. The work and any associated testing followed established quality assurance requirements and was conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plan are reported. Also reported are any unusual or anomalous occurences that are different from the starting hypotheses. The test results and this report have been reviewed and verified.

  2. Residential Sampling Report of Walter Coke Inc., Birmingham, Alabama, facility, December 2009

    EPA Pesticide Factsheets

    The field activities and results of the investigation in three residential neighborhoods – Collegeville, Fairmont, and Harriman Park. Performed in accordance with the EPA approved Residential Sampling Work Plan, final revision August 2008 (CH2M HILL, 2008)

  3. Accelerated vehicle-to-infrastructure (V2I) safety applications : system requirements document : final.

    DOT National Transportation Integrated Search

    2001-05-01

    The purpose of this working paper is to provide an estimate of the federal proportion of funds expended on intelligent transportation systems (ITS) infrastructure deployments for fiscal year (FY) 2000 using budget and planning data from state departm...

  4. An expert-based approach to forest road network planning by combining Delphi and spatial multi-criteria evaluation.

    PubMed

    Hayati, Elyas; Majnounian, Baris; Abdi, Ehsan; Sessions, John; Makhdoum, Majid

    2013-02-01

    Changes in forest landscapes resulting from road construction have increased remarkably in the last few years. On the other hand, the sustainable management of forest resources can only be achieved through a well-organized road network. In order to minimize the environmental impacts of forest roads, forest road managers must design the road network efficiently and environmentally as well. Efficient planning methodologies can assist forest road managers in considering the technical, economic, and environmental factors that affect forest road planning. This paper describes a three-stage methodology using the Delphi method for selecting the important criteria, the Analytic Hierarchy Process for obtaining the relative importance of the criteria, and finally, a spatial multi-criteria evaluation in a geographic information system (GIS) environment for identifying the lowest-impact road network alternative. Results of the Delphi method revealed that ground slope, lithology, distance from stream network, distance from faults, landslide susceptibility, erosion susceptibility, geology, and soil texture are the most important criteria for forest road planning in the study area. The suitability map for road planning was then obtained by combining the fuzzy map layers of these criteria with respect to their weights. Nine road network alternatives were designed using PEGGER, an ArcView GIS extension, and finally, their values were extracted from the suitability map. Results showed that the methodology was useful for identifying road that met environmental and cost considerations. Based on this work, we suggest future work in forest road planning using multi-criteria evaluation and decision making be considered in other regions and that the road planning criteria identified in this study may be useful.

  5. General Educational Requirements for Access to Manual Skills Training in Botswana. Final Report. Surveys and Studies in Adult Education.

    ERIC Educational Resources Information Center

    Ahmad, N.; And Others

    This report of a study to analyze the problems of access to institutional skills training of the manual work force is divided into five chapters. Chapter l introduces the study and explains the work plan and methodology. Chapter 2 discusses patterns of employment and overviews the provision of manual skills training in Botswana. Chapter 3 concerns…

  6. Ecological Census Techniques - 2nd Edition

    NASA Astrophysics Data System (ADS)

    Sutherland, Edited By William J.

    2006-08-01

    This is an updated version of the best selling first edition, Ecological Census Techniques, with updating, some new chapters and authors. Almost all ecological and conservation work involves carrying out a census or survey. This practically focussed book describes how to plan a census, the practical details and shows with worked examples how to analyse the results. The first three chapters describe planning, sampling and the basic theory necessary for carrying out a census. In the subsequent chapters international experts describe the appropriate methods for counting plants, insects, fish, amphibians, reptiles, mammals and birds. As many censuses also relate the results to environmental variability, there is a chapter explaining the main methods. Finally, there is a list of the most common mistakes encountered when carrying out a census. Gives worked examples and describes practical details The chapter on research planning provides an approach for planning any research, not just those relating to census techniques Latest edition of a very highly-regarded book. Includes new authors, each chapter has been updated, and additional chapters on sampling and designing research programmes have been added

  7. Next generation crack sealing planning tool for pavement preservation : final report.

    DOT National Transportation Integrated Search

    2016-03-01

    As one of the most popular preventive maintenance methods, crack sealing and filling (CS/CF) has been widely : used by state highway agencies. Due to stringent highway budgets and the lack of work forces in state highway : agencies, it is urgent that...

  8. 7 CFR 1781.11 - Other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... treatment plants are included in watershed work plans, NRCS will not furnish engineering services for their... contract awards, spot checks of engineering inspection, and final inspection and acceptance. (b..., and financial advisor or fiscal agent. Form RD 442-19, “Agreement for Engineering Services,” may be...

  9. 7 CFR 1781.11 - Other considerations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... treatment plants are included in watershed work plans, NRCS will not furnish engineering services for their... contract awards, spot checks of engineering inspection, and final inspection and acceptance. (b..., and financial advisor or fiscal agent. Form RD 442-19, “Agreement for Engineering Services,” may be...

  10. B-70 Aircraft Study. Volume 1

    NASA Technical Reports Server (NTRS)

    Johnson, V. T.

    1972-01-01

    This Phase 2 final report for the B-70 aircraft study contains the data location matrix, which provides a summary of the major cost, schedule, and technical items provided in the report; work breakdown structure; cost definitions; and B-70 program level summary data. The Phase 2 objective was to provide the B-70 aircraft data in accordance with the approved study plan. Several minor modifications to the original plan have been made as the result of the Phase 2 effort.

  11. RMA Abandoned Well Closure Program. Final Task Plan, Version 3.0.

    DTIC Science & Technology

    1989-05-01

    20503. 1 . AGENCY USE ONLY (Leave blank) 2. REPORT DATE" 0 3. REPORT TYPE AND DATES COVERED _T 05/00/89 __________________ 4. TITLE AND SUBTITLE S...AQUIFERS. THE SCOPE OF WORK INCLUDES: 1 . COMPILATION OF A WELL INVENTORY AND DATABASE 2. FIELD LOCATION OF WELLS 3. CLEANING AND CLOSURE OF...APPROXIMATELY 350 WELT- 4. DOCUMENTATION OF CLOSURE ACTIVITIES. SECTIONS OF THIS TASK PLAN DETAIL-INFORMATION ON: 1 . ABANDONED WELL IDENTIFICATION AND LOCATION

  12. 77 FR 54566 - Mid-Atlantic Fishery Management Council (MAFMC); Public Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... Fishery Management Council (MAFMC); Public Meeting AGENCY: National Marine Fisheries Service (NMFS.... SUMMARY: The Mid-Atlantic Fishery Management Council (Council) Staff will hold the second meeting of the Visioning and Strategic Planning Working Group. During this meeting, the group will finalize draft vision...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mauro, R.; Leach, S.

    This paper summarizes current and planned activities in the areas of hydrogen production and use, near-term venture opportunities, and codes and standards. The rationale for these efforts is to assess industry interest and engage in activities that move hydrogen technologies down the path to commercialization. Some of the work presented in this document is a condensed, preliminary version of reports being prepared under the DOE/NREL contract. In addition, the NHA work funded by Westinghouse Savannah River Corporation (WSRC) to explore the opportunities and industry interest in a Hydrogen Research Center is briefly described. Finally, the planned support of and industrymore » input to the Hydrogen Technical Advisory Panel (HTAP) on hydrogen demonstration projects is discussed.« less

  14. Geospatial analysis based on GIS integrated with LADAR.

    PubMed

    Fetterman, Matt R; Freking, Robert; Fernandez-Cull, Christy; Hinkle, Christopher W; Myne, Anu; Relyea, Steven; Winslow, Jim

    2013-10-07

    In this work, we describe multi-layered analyses of a high-resolution broad-area LADAR data set in support of expeditionary activities. High-level features are extracted from the LADAR data, such as the presence and location of buildings and cars, and then these features are used to populate a GIS (geographic information system) tool. We also apply line-of-sight (LOS) analysis to develop a path-planning module. Finally, visualization is addressed and enhanced with a gesture-based control system that allows the user to navigate through the enhanced data set in a virtual immersive experience. This work has operational applications including military, security, disaster relief, and task-based robotic path planning.

  15. Using a concept map as a tool for strategic planning: The Healthy Brain Initiative.

    PubMed

    Anderson, Lynda A; Day, Kristine L; Vandenberg, Anna E

    2011-09-01

    Concept mapping is a tool to assist in strategic planning that allows planners to work through a sequence of phases to produce a conceptual framework. Although several studies describe how concept mapping is applied to various public health problems, the flexibility of the methods used in each phase of the process is often overlooked. If practitioners were more aware of the flexibility, more public health endeavors could benefit from using concept mapping as a tool for strategic planning. The objective of this article is to describe how the 6 concept-mapping phases originally outlined by William Trochim guided our strategic planning process and how we adjusted the specific methods in the first 2 phases to meet the specialized needs and requirements to create The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health. In the first stage (phases 1 and 2 of concept mapping), we formed a steering committee, convened 4 work groups over a period of 3 months, and generated an initial set of 42 action items grounded in science. In the second stage (phases 3 and 4), we engaged stakeholders in sorting and rating the action items and constructed a series of concept maps. In the third and final stage (phases 5 and 6), we examined and refined the action items and generated a final concept map consisting of 44 action items. We then selected the top 10 action items, and in 2007, we published The Healthy Brain Initiative: A National Public Health Road Map to Maintaining Cognitive Health, which represents the strategic plan for The Healthy Brain Initiative.

  16. 10 CFR 440.12 - State application.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the method used by the State to insure the quality of work and adequate financial management control... include a copy of the final State plan; (3) The budget for total funds applied for under the Act, which....18(d) for State administration; (4) The total number of dwelling units proposed to be weatherized...

  17. 77 FR 5528 - National Commission on Indian Trust Administration and Reform

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ... and work plan, and reviewing past trust reform and FACA committee efforts. A final agenda will be... DEPARTMENT OF THE INTERIOR Office of the Secretary National Commission on Indian Trust... Office of the Secretary is announcing that the National Commission on Indian Trust Administration and...

  18. Implementation of a Web-Based Collaborative Process Planning System

    NASA Astrophysics Data System (ADS)

    Wang, Huifen; Liu, Tingting; Qiao, Li; Huang, Shuangxi

    Under the networked manufacturing environment, all phases of product manufacturing involving design, process planning, machining and assembling may be accomplished collaboratively by different enterprises, even different manufacturing stages of the same part may be finished collaboratively by different enterprises. Based on the self-developed networked manufacturing platform eCWS(e-Cooperative Work System), a multi-agent-based system framework for collaborative process planning is proposed. In accordance with requirements of collaborative process planning, share resources provided by cooperative enterprises in the course of collaboration are classified into seven classes. Then a reconfigurable and extendable resource object model is built. Decision-making strategy is also studied in this paper. Finally a collaborative process planning system e-CAPP is developed and applied. It provides strong support for distributed designers to collaboratively plan and optimize product process though network.

  19. Motivation towards medical career choice and future career plans of Polish medical students.

    PubMed

    Gąsiorowski, Jakub; Rudowicz, Elżbieta; Safranow, Krzysztof

    2015-08-01

    This longitudinal study aimed at investigating Polish medical students' career choice motivation, factors influencing specialty choices, professional plans and expectations. The same cohort of students responded to the same questionnaire, at the end of Year 1 and Year 6. The Chi-square, Mann-Whitney U tests and logistic regression were used in analyses. The results showed that altruistic and scientific reasons were the main motives for choosing a medical career. The motives remained stable over time. The effect of gender on altruistic motivation was stronger at the end of the study, with females' rating higher. The most favored career paths were associated with non-primary care specializations and work in a hospital. Results of the multivariate logistic regression showed that primary care specializations were more attractive to females, final year students, those from small agglomerations, and those less concerned about high earnings. Preferences regarding sector of work were formed at later stages of training. A preference shift was observed, between Year 1 and Year 6, towards favoring work in the public sector. Predictors of the desire to work in the public sector were: being a male and the final year student, paying less attention to high earnings, wanting certainty of finding work, having a stronger need for interesting and socially important work. A significant decline in the level of interest in seeking employment abroad was observed with the progress of studies. Our findings are likely to provide useful information for educators, policy planners and policy makers.

  20. Virtual Planning at Work: A Tour of NASA Future Flight Central

    NASA Technical Reports Server (NTRS)

    McClenahen, Jim; Dorighi, Nancy S. (Technical Monitor)

    2000-01-01

    FutureFlight Central will permit integration of tomorrow's technologies in a risk-free simulation of any airport, airfield, and tower cab environment. The facility provides an opportunity for airlines to mitigate passenger delays by fine tuning airport hub operations, gate management and ramp movement procedures. It also allows airport managers an opportunity to study effects of various improvements at their airports. Finally, it enables air traffic controllers to provide feedback and to become familiar with new airport operations and technologies before final installation.

  1. 76 FR 17808 - Final Vehicle Safety Rulemaking and Research Priority Plan 2011-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... [Docket No. NHTSA-2009-0108] Final Vehicle Safety Rulemaking and Research Priority Plan 2011- 2013 AGENCY... availability. SUMMARY: This document announces the availability of the Final NHTSA Vehicle Safety and Fuel.... This Priority Plan is an update to the Final Vehicle Safety Rulemaking and Research Priority Plan 2009...

  2. Coordinating robot motion, sensing, and control in plans. LDRD project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xavier, P.G.; Brown, R.G.; Watterberg, P.A.

    1997-08-01

    The goal of this project was to develop a framework for robotic planning and execution that provides a continuum of adaptability with respect to model incompleteness, model error, and sensing error. For example, dividing robot motion into gross-motion planning, fine-motion planning, and sensor-augmented control had yielded productive research and solutions to individual problems. Unfortunately, these techniques could only be combined by hand with ad hoc methods and were restricted to systems where all kinematics are completely modeled in planning. The original intent was to develop methods for understanding and autonomously synthesizing plans that coordinate motion, sensing, and control. The projectmore » considered this problem from several perspectives. Results included (1) theoretical methods to combine and extend gross-motion and fine-motion planning; (2) preliminary work in flexible-object manipulation and an implementable algorithm for planning shortest paths through obstacles for the free-end of an anchored cable; (3) development and implementation of a fast swept-body distance algorithm; and (4) integration of Sandia`s C-Space Toolkit geometry engine and SANDROS motion planer and improvements, which yielded a system practical for everyday motion planning, with path-segment planning at interactive speeds. Results (3) and (4) have either led to follow-on work or are being used in current projects, and they believe that (2) will eventually be also.« less

  3. A 6-DOF parallel bone-grinding robot for cervical disc replacement surgery.

    PubMed

    Tian, Heqiang; Wang, Chenchen; Dang, Xiaoqing; Sun, Lining

    2017-12-01

    Artificial cervical disc replacement surgery has become an effective and main treatment method for cervical disease, which has become a more common and serious problem for people with sedentary work. To improve cervical disc replacement surgery significantly, a 6-DOF parallel bone-grinding robot is developed for cervical bone-grinding by image navigation and surgical plan. The bone-grinding robot including mechanical design and low level control is designed. The bone-grinding robot navigation is realized by optical positioning with spatial registration coordinate system defined. And a parametric robot bone-grinding plan and high level control have been developed for plane grinding for cervical top endplate and tail endplate grinding by a cylindrical grinding drill and spherical grinding for two articular surfaces of bones by a ball grinding drill. Finally, the surgical flow for a robot-assisted cervical disc replacement surgery procedure is present. The final experiments results verified the key technologies and performance of the robot-assisted surgery system concept excellently, which points out a promising clinical application with higher operability. Finally, study innovations, study limitations, and future works of this present study are discussed, and conclusions of this paper are also summarized further. This bone-grinding robot is still in the initial stage, and there are many problems to be solved from a clinical point of view. Moreover, the technique is promising and can give a good support for surgeons in future clinical work.

  4. Nez Perce Tribal Hatchery Project : Combined-Planning & Design and Operations & Maintenance Reports, 2000 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Larson, Roy Edward; Walker, Grant W.

    2002-12-31

    Nez Perce Tribal Hatchery (NPTH) Year-2000 Combined Maintenance and Operations (O&M) and Planning and Design (P&D) contract is hereby completed based on this annual report patterned after the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration. Primary project activities focused on completion of the Northwest Power Planning Council Step-3 process that: (1) Accepted final design, (2) Authorized a capital construction amount of $16,050,000, and (3) Authorized contractor selection, and (4) Provided construction site dedication, and (5) Implemented construction activities over an anticipated 2-year period of July 2000 through October 2002.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  6. The production deployment of IPv6 on WLCG

    NASA Astrophysics Data System (ADS)

    Bernier, J.; Campana, S.; Chadwick, K.; Chudoba, J.; Dewhurst, A.; Eliáš, M.; Fayer, S.; Finnern, T.; Grigoras, C.; Hartmann, T.; Hoeft, B.; Idiculla, T.; Kelsey, D. P.; López Muñoz, F.; Macmahon, E.; Martelli, E.; Millar, A. P.; Nandakumar, R.; Ohrenberg, K.; Prelz, F.; Rand, D.; Sciabà, A.; Tigerstedt, U.; Voicu, R.; Walker, C. J.; Wildish, T.

    2015-12-01

    The world is rapidly running out of IPv4 addresses; the number of IPv6 end systems connected to the internet is increasing; WLCG and the LHC experiments may soon have access to worker nodes and/or virtual machines (VMs) possessing only an IPv6 routable address. The HEPiX IPv6 Working Group has been investigating, testing and planning for dual-stack services on WLCG for several years. Following feedback from our working group, many of the storage technologies in use on WLCG have recently been made IPv6-capable. This paper presents the IPv6 requirements, tests and plans of the LHC experiments together with the tests performed on the group's IPv6 test-bed. This is primarily aimed at IPv6-only worker nodes or VMs accessing several different implementations of a global dual-stack federated storage service. Finally the plans for deployment of production dual-stack WLCG services are presented.

  7. Final Report - ILAW PCT, VHT, Viscosity, and Electrical Conductivity Model Development, VSL-07R1230-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kruger, Albert A.; Cooley, S. K.; Joseph, I.

    This report describes the results of work and testing specified by the Test Specifications (24590-LAW-TSP-RT-01-013 Rev.1 and 24590-WTP-TSP-RT-02-001 Rev.0), Test Plans (VSL-02T4800-1 Rev.1 & TP-RPP-WTP-179 Rev.1), and Text Exception (24590-WTP-TEF-RT-03-040). The work and any associated testing followed established quality assurance requirements and conducted as authorized. The descriptions provided in this test report are an accurate account of both the conduct of the work and the data collected. Results required by the Test Plans are reported. Also reported are any unusual or anomalous occurrences that are different from the starting hypotheses. The test results and this report have been reviewed andmore » verified.« less

  8. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  9. 78 FR 76176 - Notice of Availability of the Record of Decision for the Final Trail Management Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ...] Notice of Availability of the Record of Decision for the Final Trail Management Plan/Environmental Impact... (ROD) for the Final Trail Management Plan/ Environmental Impact Statement (Plan/EIS), Cuyahoga Valley... 1, the no-action alternative, the trails, authorized uses, and facilities addressed in this Plan/EIS...

  10. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  11. Tank waste remediation system multi-year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less

  12. Final recovery plan of the southwestern willow flycatcher (Empidonax traillii extimus)

    Treesearch

    Deborah M. Finch; Stephen I. Rothstein; Jon C. Boren; William L. Graf; Jerry L. Holechek; Barbara E. Kus; Robert M. Marshall; Molly M. Pohl; Susan J. Sferra; Mark K. Sogge; Julie C. Stromberg; Bradley A. Valentine; Mary J. Whitfield; Sartor O. Williams

    2002-01-01

    The Southwestern Willow Flycatcher Recovery Team is composed of a Technical Subgroup (pg. ii), six Implementation Subgroups (Appendix A), and a Tribal Working Group. The Technical Subgroup consists of 14 academic scientists, researchers, and resource managers with a wide range of expertise in avian biology and ecology, southwestern willow flycatcher ecology, cowbird...

  13. Partnership with Industry: Film Production Technology.

    ERIC Educational Resources Information Center

    Rietveld, Richard; And Others

    The 1988 final report of a task force from the Florida Postsecondary Education Planning Commission stated that in order to ensure continued growth of the motion picture film industry in the state, the postsecondary community must provide a well-trained and competent work force adept in all aspects of the industry. The film industry is a growing…

  14. How To Write a Manual.

    ERIC Educational Resources Information Center

    Slatkin, Elizabeth

    Intended as a series of hands-on, step-by-step lessons, this book presents instructions, checklists, exercises, and examples to guide people who work in business, industry, science or government through all phases of manual preparation from planning to research to writing, all the way to getting the final piece printed. The first chapter shows how…

  15. Achievement Motivation Development Project. Final Report.

    ERIC Educational Resources Information Center

    McClelland, Dave C.; Alschuler, Alfred S.

    Two efforts were made to develop achievement motivation in school children and to observe the effect of such training on their behavior in and out of school. These studies were undertaken because: (1) Achievement motivation might help children think more seriously about their work habits and career planning; (2) It might improve the grades of…

  16. ACHP | Advisory Council on Historic Preservation Frequently Asked Questions

    Science.gov Websites

    NHPA; and works to improve Federal policies, programs, planning, and decisions when they affect the citizen members, a Native American, a governor, a mayor, and four federal agency heads, all appointed by consider their views and concerns about historic preservation issues when making final project decisions

  17. The Early Childhood Community Gives Back: Exchange Center Makeover Project

    ERIC Educational Resources Information Center

    Exchange: The Early Childhood Leaders' Magazine Since 1978, 2010

    2010-01-01

    The excitement, joy, and big smiles still permeate Jewel's Learning Center since the surprise announcement in June. Over the past several months the Makeover partners have been busy working with Miss Charlotte, Miss Jewel, and staff to create design plans necessary for final approval. Charlotte, with the help of Collaborative for Children and…

  18. 75 FR 37790 - Lauryl Sulfate Salts; Antimicrobial Registration Review Final Work Plan and Proposed Registration...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... function without unreasonable adverse effects on human health or the environment. Through this program, EPA..., including its effects on human health and the environment. DATES: Comments must be received on or before... interest to a wide range of stakeholders including environmental, human health, farm worker, and...

  19. Instructional Materials in Spanish for Agriculture. Final Report.

    ERIC Educational Resources Information Center

    Mainous, Bruce H.

    A federally funded project to develop Spanish for Agricultural Purposes, a set of instructional materials for agricultural specialists planning to work in Latin America, is reported. The materials are intended for use by individuals with at least a year's college-level study of Spanish. They include: a series of authentic readings, each with an…

  20. A Bibliography of the Literature on Optical Storage Technology. Final Report.

    ERIC Educational Resources Information Center

    Park, James R.

    Compiled to serve as a working tool for those involved in optical storage research, planning, and development, this bibliography contains nearly 700 references related to the optical storage and retrieval of digital computer data. Citations are divided into two major groups covering the general and patent literatures. Each citation includes the…

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Amanda S.; Brosha, Eric

    This is the second progress report on the demonstration of a prototype hydrogen sensor and electronics package. It goes into detail about the five tasks, four of which are already completed as of August 2016, with the final to be completed by January 26, 2017. Then the budget is detailed along with the planned work for May 27, 2016 to July 27, 2016.

  2. Waking the health plan giant: Group Health Cooperative stops counting sheep and starts counting key tobacco indicators.

    PubMed

    McAfee, T

    1998-01-01

    Implementing a comprehensive approach to decreasing tobacco use in a large health plan requires hard work and commitment on the part of many individuals. We found that major organisational change can be accomplished and sustained. Keys to our success included our decision to remove access barriers to our cessation programmes (including cost); obtaining top leadership buy-in; identifying accountable individuals who owned responsibility for change; measuring key processes and outcomes; and finally keeping at it tenaciously through multiple cycles of improvement.

  3. Development of Technologies to Utilize Laser Plasma Radiations Sources for Radiation Effects Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davis, J F

    2007-01-31

    This final report will cover work performed over the period of November 11, 2005 to September 30, 2006 on the contract to develop technologies using laser sources for radiation effects sciences. The report will discuss four topic areas; the laser source experiments on the Gekko Laser at Osaka, Japan, planning for the Charge State Freeze Out experiments to be performed in calendar year 2007, a review of previous xenon gasbags on the LANL Trident laser to provide planning support to the May-June 2007 HELEN experiments.

  4. Cost and Schedule Analytical Techniques Development: Option 2 Year

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) for the Option 2 Year from December 1, 1996 through November 30, 1997. The Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides products and deliverable in the form of models, data bases, methodologies, studies and analyses for the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PPO3) the Program Plans and Requirements Officer (PP02), and other user organizations. Detailed Monthly Progress reports were submitted to MSFC in accordance with the contract's Statement of Work, Section TV "Reporting and Documentation". These reports spelled out each month's specific work accomplishments, deliverables submitted, major meetings held, and other pertinent information. This Final Report will summarize these activities at higher level. During this contract Option Year, SAIC expended 29,830 man-hours in tile performance of tasks called out in the Statement of Work and reported oil in this yearly Final Report. This represents approximately 16 full-time EPs. Included are the basis Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Chicago, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  5. Life sciences payload definition and integration study. Volume 2: Requirements, design, and planning studies for the carry-on laboratories. [for Spacelab

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The task phase concerned with the requirements, design, and planning studies for the carry-on laboratory (COL) began with a definition of biomedical research areas and candidate research equipment, and then went on to develop conceptual layouts for COL which were each evaluated in order to arrive at a final conceptual design. Each step in this design/evaluation process concerned itself with man/systems integration research and hardware, and life support and protective systems research and equipment selection. COL integration studies were also conducted and include attention to electrical power and data management requirements, operational considerations, and shuttle/Spacelab interface specifications. A COL program schedule was compiled, and a cost analysis was finalized which takes into account work breakdown, annual funding, and cost reduction guidelines.

  6. Efficiency improvements of offline metrology job creation

    NASA Astrophysics Data System (ADS)

    Zuniga, Victor J.; Carlson, Alan; Podlesny, John C.; Knutrud, Paul C.

    1999-06-01

    Progress of the first lot of a new design through the production line is watched very closely. All performance metrics, cycle-time, in-line measurement results and final electrical performance are critical. Rapid movement of this lot through the line has serious time-to-market implications. Having this material waiting at a metrology operation for an engineer to create a measurement job plan wastes valuable turnaround time. Further, efficient use of a metrology system is compromised by the time required to create and maintain these measurement job plans. Thus, having a method to develop metrology job plans prior to the actual running of the material through the manufacture area can significantly improve both cycle time and overall equipment efficiency. Motorola and Schlumberger have worked together to develop and test such a system. The Remote Job Generator (RJG) created job plans for new device sin a manufacturing process from an NT host or workstation, offline. This increases available system tim effort making production measurements, decreases turnaround time on job plan creation and editing, and improves consistency across job plans. Most importantly this allows job plans for new devices to be available before the first wafers of the device arrive at the tool for measurement. The software also includes a database manager which allows updates of existing job plans to incorporate measurement changes required by process changes or measurement optimization. This paper will review the result of productivity enhancements through the increased metrology utilization and decreased cycle time associated with the use of RJG. Finally, improvements in process control through better control of Job Plans across different devices and layers will be discussed.

  7. United States Air Force 611th Air Support Group Civil Engineering Squadron, Elmendorf AFB, Alaska. Remedial investigation and feasibility study Point Lay Radar Installation, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Karmi, S.

    1996-03-04

    The United States Air Force (Air Force) has prepared this Remedial Investigation/Feasibility Study (RI/FS) report to present the results of RI/FS activities at four sites located at the Point Lay radar installation. The remedial investigation (RI) field activities were conducted at the Point Lay radar installation during the summer of 1993. The four sites at Point Lay were investigated because they were suspected of being contaminated with hazardous substances. RI activities were conducted using methods and procedures specified in the RI/FS Work Plan, Sampling and Analysis Plan (SAP), and Health and Safety Plan.

  8. Remote Sensing of Landuse Changes and Implications for Landuse Policy

    NASA Technical Reports Server (NTRS)

    Kennedy, Ken

    1996-01-01

    This final report describes grant activities under which students were to study landuse changes by comparing planning and zoning documents using remote sensed data data analyzed and interpreted in the laboratory. Students were recruited through mathematics, political science and engineering classes an clubs. Work protocols were then organized for research on the county's growth patterns over the last three decades. Students and investigators made planes to identify specific scenes in Landsat and other data which would satisfy the research parameters. Finally, statistical and imaging software was identified and some was acquired.

  9. FY 1986 current fiscal year work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  10. [A decade of reflection on health plans in Spain. SESPAS report 2010].

    PubMed

    Fiuza Pérez, María Dolores; Aguiar Rodríguez, Juan Francisco; Monzón Batista, Nayra

    2010-12-01

    This article reports the experience of the Working Group of the SESPAS-SCSP (Spanish Society of Public Health and Healthcare Administration-Canary Islands Society of Public Health) in health policy and planning during the first decade of the 21st century and its possible impact on the design of health planning. We review the conclusions reached from 2000 to 2008 in the first five Biannual Planning and Health Policy meetings that took place during that period. The workshops were designed with two speakers who presented different views of the subject under discussion, a moderator, who led the debate on the findings, and a narrator who served as a notary and also took responsibility for the text summary of each table. Two general narrators were responsible for the final wording of the conclusions of each workshop or biannual meeting. From 2000 to 2008, there were 25 round tables with 121 conclusions and 160 participants. We believe that the SESPAS working groups provide multidisciplinary professional values within a context of debate in a professional environment, and create spaces for reflection, thus helping to improve the health planning system in Spain. Copyright © 2010 SESPAS. Published by Elsevier Espana. All rights reserved.

  11. 77 FR 12877 - Record of Decision for the General Management Plan/Abbreviated Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ... Decision for the General Management Plan/Abbreviated Final Environmental Impact Statement for New River... Abbreviated Final Environmental Impact Statement for the General Management Plan for New River Gorge National... Record of Decision can be downloaded from the NPS Planning, Environment and Public Comment (PEPC) Web...

  12. Phase IV of Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Trustees published the Final Phase IV Early Restoration Plan and Environmental Assessments. The plan habitats. Useful Links: Final Phase IV Early Restoration Plan and Environmental Assessments (pdf, 4.8 MB ) Final Phase IV Early Restoration Plan and Environmental Assessments Executive Summary (pdf, 729 KB

  13. Understanding planning ability measured by the Tower of London: an evaluation of its internal structure by latent variable modeling.

    PubMed

    Koppenol-Gonzalez, Gabriela V; Bouwmeester, Samantha; Boonstra, A Marije

    2010-12-01

    The Tower of London (TOL) is a widely used instrument for assessing planning ability. Inhibition and (spatial) working memory are assumed to contribute to performance on the TOL, but findings about the relationship between these cognitive processes are often inconsistent. Moreover, the influence of specific properties of TOL problems on cognitive processes and difficulty level is often not taken into account. Furthermore, it may be expected that several planning strategies can be distinguished that cannot be extracted from the total score. In this study, a factor analysis and a latent class regression analysis were performed to address these issues. The results showed that 4 strategy groups that differed with respect to preplanning time could be distinguished. The effect of problem properties also differed for the 4 groups. Additional analyses showed that the groups differed on average planning performance but that there were no significant differences between inhibition and spatial working memory performance. Finally, it seemed that multiple factors influence performance on the TOL, the most important ones being the score measurements, the problem properties, and strategy use.

  14. Tax treatment of cafeteria plans. Internal Revenue Service (IRS), Treasury. Final regulations.

    PubMed

    2000-03-23

    This document contains final regulations relating to section 125 cafeteria plans. The final regulations clarify the circumstances under which a section 125 cafeteria plan election may be changed. The final regulations permit an employer to allow a section 125 cafeteria plan participant to revoke an existing election and make a new election during a period of coverage for accident or health coverage or group-term life insurance coverage.

  15. Fourth international circumpolar arctic vegetation mapping workshop

    USGS Publications Warehouse

    Raynolds, Martha K.; Markon, C.J.

    2002-01-01

    During the week of April 10, 2001, the Fourth International Circumpolar Arctic Vegetation Mapping Workshop was held in Moscow, Russia. The purpose of this meeting was to bring together the vegetation scientists working on the Circumpolar Arctic Vegetation Map (CAVM) to (1) review the progress of current mapping activities, (2) discuss and agree upon a standard set of arctic tundra subzones, (3) plan for the production and dissemination of a draft map, and (4) begin work on a legend for the final map.

  16. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  17. Kindergarten through 12th Grade Project in Career Development and Bridging the Gap Between School and Work: Final Report.

    ERIC Educational Resources Information Center

    Watertown Independent School District 1, SD.

    Divided into four phases, this project in career education includes the following aspects: planning of project policies and activities and securing resource materials; orientation of the school district staff to the project; integration of occupational information, exploration, and career education concepts into the curriculum, identification of…

  18. Reorganization of the Public School System. Bulletin, 1916, No. 8

    ERIC Educational Resources Information Center

    Bunker, Frank Forest

    1916-01-01

    The movement toward a functional reorganization of the school system began more than two decades ago, and has survived two of the stages through which every project, on its way from inception to practice, must necessarily pass: that of academic discussion and that of consideration of working plans. It is now entering the final stage, that of…

  19. Fuels planning: science synthesis and integration; social issues fact sheet 08: The "Golden Rule" and other lessons on communicating about hazards

    Treesearch

    Rocky Mountain Research Station USDA Forest Service

    2004-01-01

    Other fact sheets identified considerations for communicating about hazards, talked about the importance of working locally, and discussed the seven laws of effective hazard communication. This fact sheet introduces the "Golden Rule" of hazard communication and shares some final lessons from hazard educators.

  20. Symposium on Direct Instruction: The Follow Through Data Show That Some Programs Work Better Than Others.

    ERIC Educational Resources Information Center

    Becker, Wesley C.

    The Abt Associates' final report on the Follow-Through Planned Variation Experiment is defended against the critique published by a blue ribbon panel funded by the Ford Foundation. In contrast to the conclusions drawn by House, Glass, McLean, and Walker that Follow Through showed no "winners" or "losers", the National…

  1. 75 FR 57059 - Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N175; 61130-1115-0000 F2] Montana Department of Natural Resources and Conservation Final Habitat Conservation Plan and Final... Department of Natural Resources and Conservation (DNRC) a Final Habitat Conservation Plan (HCP) and prepared...

  2. An optimization design for evacuation planning based on fuzzy credibility theory and genetic algorithm

    NASA Astrophysics Data System (ADS)

    Zhang, D.; Zhang, W. Y.

    2017-08-01

    Evacuation planning is an important activity in disaster management. It has to be planned in advance due to the unpredictable occurrence of disasters. It is necessary that the evacuation plans are as close as possible to the real evacuation work. However, the evacuation plan is extremely challenging because of the inherent uncertainty of the required information. There is a kind of vehicle routing problem based on the public traffic evacuation. In this paper, the demand for each evacuation set point is a fuzzy number, and each routing selection of the point is based on the fuzzy credibility preference index. This paper proposes an approximate optimal solution for this problem by the genetic algorithm based on the fuzzy reliability theory. Finally, the algorithm is applied to an optimization model, and the experiment result shows that the algorithm is effective.

  3. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunkermore » currently stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  4. Decontamination and decommissioning plan for processing contaminated NaK at the INEL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaRue, D.M.; Dolenc, M.R.

    1986-09-01

    This decontamination and decommissioning (D&D) plan describes the work elements and project management plan for processing four containers of contaminated sodium/potassium (NaK) and returning the Army Reentry Vehicle Facility Site (ARVFS) to a reusable condition. The document reflects the management plan for this project before finalizing the conceptual design and preliminary prototype tests of the reaction kinetics. As a result, the safety, environmental, and accident analyses are addressed as preliminary assessments before completion at a later date. ARVFS contains an earth-covered bunker, a cylindrical test pit and metal shed, and a cable trench connecting the two items. The bunker currentlymore » stores the four containers of NaK from the meltdown of the EBR-1 Mark II core. The D&D project addressed in this plan involves processing the contaminated NaK and returning the ARVFS to potential reuse after cleanup.« less

  5. AeroPropulsoServoElasticity: Dynamic Modeling of the Variable Cycle Propulsion System

    NASA Technical Reports Server (NTRS)

    Kopasakis, George

    2012-01-01

    This presentation was made at the 2012 Fundamental Aeronautics Program Technical Conference and it covers research work for the Dynamic Modeling of the Variable cycle Propulsion System that was done under the Supersonics Project, in the area of AeroPropulsoServoElasticity. The presentation covers the objective for the propulsion system dynamic modeling work, followed by the work that has been done so far to model the variable Cycle Engine, modeling of the inlet, the nozzle, the modeling that has been done to model the affects of flow distortion, and finally presenting some concluding remarks and future plans.

  6. LDRD project final report : hybrid AI/cognitive tactical behavior framework for LVC.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Djordjevich, Donna D.; Xavier, Patrick Gordon; Brannon, Nathan Gregory

    This Lab-Directed Research and Development (LDRD) sought to develop technology that enhances scenario construction speed, entity behavior robustness, and scalability in Live-Virtual-Constructive (LVC) simulation. We investigated issues in both simulation architecture and behavior modeling. We developed path-planning technology that improves the ability to express intent in the planning task while still permitting an efficient search algorithm. An LVC simulation demonstrated how this enables 'one-click' layout of squad tactical paths, as well as dynamic re-planning for simulated squads and for real and simulated mobile robots. We identified human response latencies that can be exploited in parallel/distributed architectures. We did an experimentalmore » study to determine where parallelization would be productive in Umbra-based force-on-force (FOF) simulations. We developed and implemented a data-driven simulation composition approach that solves entity class hierarchy issues and supports assurance of simulation fairness. Finally, we proposed a flexible framework to enable integration of multiple behavior modeling components that model working memory phenomena with different degrees of sophistication.« less

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chu, C.I.C.; Gillespie, B.L.

    One of the most perplexing problems facing the coal industry is how to properly dispose of the waste and/or even recovery a small fraction of the Btu value of the waste, while minimizing the environmental concerns. UCC Research considers this monumental environmental problems as an opportunity to recovery useable organic materials and reduce the environmental problems created by coal waste. Mild gasification is the method used by UCC Research to realize these objectives. Coal feedstocks are fed into the mild gasification system yielding liquids, char, and gases for commercial application. The program consists of seven tasks: Task 1, Characterize Managementmore » of Coal Preparation Wastes; Task 2, Review Design Specifications and Prepare Preliminary Test Plan; Task 3, Select and Characterize Test Feedstocks; Task 4, Acquire/Construct Process Elements; Task 5, Prepare Final Test Plan; Task 6, Implement Final Test Plan; Task 7, Analyze Test Results and Assess System Economics. A schedule of the program is given. The program was initiated on September 30, 1984. Tasks 1, 2, 3, 4, 5, and 6 have been completed. Work is continuing on Task 7.« less

  8. Assessment of Work Climates: The Appropriateness of Classical-Management Theory and Human-Relations Theory under Various Contingencies. Final Report.

    ERIC Educational Resources Information Center

    Langdale, John A.

    The construct of "organizational climate" was explicated and various ways of operationalizing it were reviewed. A survey was made of the literature pertinent to the classical-human relations dimension of environmental quality. As a result, it was hypothesized that the appropriateness of the classical and human-relations master plans is moderated…

  9. Copenhagen 2009: Could a Cap-and-Trade Market Combat Global Warming and Conserve Earth's Tropical Forests?

    ERIC Educational Resources Information Center

    Beedle, Harold; Calhoun, Bruce

    2009-01-01

    As the world increasingly comes to terms with the reality of global warming, international negotiators are struggling to work out the terms of a new climate change framework to be finalized this December in Copenhagen, Denmark. One aspect being discussed is a plan to compensate developing countries for reducing greenhouse gas emissions by…

  10. Design of an Orbital Inspection Satellite

    DTIC Science & Technology

    1986-12-01

    ADDRESS (City, State, and ZIP Code ) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK UNITELEMENT NO. NO. NO. CCESSION NO. 11. TITLE (include...Captain, USAF Dh t ibutioni Availabiity Codes Avail adlor Dist [Special December 1986 Approved for public release; distribution...lends itself to the technique of multi -objective analysis. The final step is planning for action. This communicates the entire systems engineering

  11. Defense Cybersecurity: Opportunities Exist for DOD to Share Cybersecurity Resources with Small Businesses

    DTIC Science & Technology

    2015-09-01

    risk self- Communications identified by small businesses . The guidance Commission includes links to addit ional cybersecurity resources...Working Group 4: Final Report. The report’s appendix provides cybersecurity risk management and best practice recommendations for small and medium...including small businesses . Cybersecurity education for risk assessment and planning. These programs provide education and training that small

  12. Recovery Act Hospital Alteration Project at Naval Air Station Jacksonville

    DTIC Science & Technology

    2010-12-07

    QMAD Quantitative Methods and Analysis Division RLF Rogers Lovelock & Fritz, Incorporated SE Southeast SF Square Feet SOW Statement of Work TMA TRICARE...Finally, the contractor, Rogers Lovelock & Fritz, Incorporated, reported the recipient information required by the Recovery Act. What We Recommend...contractor, Rogers Lovelock & Fritz, Incorporated (RLF), reported the recipient information required by the Recovery Act. Planning: Initially, Project

  13. Mission Operations Planning with Preferences: An Empirical Study

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Khatib, Lina; McGann, Conor

    2006-01-01

    This paper presents an empirical study of some nonexhaustive approaches to optimizing preferences within the context of constraint-based, mixed-initiative planning for mission operations. This work is motivated by the experience of deploying and operating the MAPGEN (Mixed-initiative Activity Plan GENerator) system for the Mars Exploration Rover Mission. Responsiveness to the user is one of the important requirements for MAPGEN, hence, the additional computation time needed to optimize preferences must be kept within reasonabble bounds. This was the primary motivation for studying non-exhaustive optimization approaches. The specific goals of rhe empirical study are to assess the impact on solution quality of two greedy heuristics used in MAPGEN and to assess the improvement gained by applying a linear programming optimization technique to the final solution.

  14. Enriching mission planning approach with state transition graph heuristics for deep space exploration

    NASA Astrophysics Data System (ADS)

    Jin, Hao; Xu, Rui; Xu, Wenming; Cui, Pingyuan; Zhu, Shengying

    2017-10-01

    As to support the mission of Mars exploration in China, automated mission planning is required to enhance security and robustness of deep space probe. Deep space mission planning requires modeling of complex operations constraints and focus on the temporal state transitions of involved subsystems. Also, state transitions are ubiquitous in physical systems, but have been elusive for knowledge description. We introduce a modeling approach to cope with these difficulties that takes state transitions into consideration. The key technique we build on is the notion of extended states and state transition graphs. Furthermore, a heuristics that based on state transition graphs is proposed to avoid redundant work. Finally, we run comprehensive experiments on selected domains and our techniques present an excellent performance.

  15. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  16. Realization of planning design of mechanical manufacturing system by Petri net simulation model

    NASA Astrophysics Data System (ADS)

    Wu, Yanfang; Wan, Xin; Shi, Weixiang

    1991-09-01

    Planning design is to work out a more overall long-term plan. In order to guarantee a mechanical manufacturing system (MMS) designed to obtain maximum economical benefit, it is necessary to carry out a reasonable planning design for the system. First, some principles on planning design for MMS are introduced. Problems of production scheduling and their decision rules for computer simulation are presented. Realizable method of each production scheduling decision rule in Petri net model is discussed. Second, the solution of conflict rules for conflict problems during running Petri net is given. Third, based on the Petri net model of MMS which includes part flow and tool flow, according to the principle of minimum event time advance, a computer dynamic simulation of the Petri net model, that is, a computer dynamic simulation of MMS, is realized. Finally, the simulation program is applied to a simulation exmple, so the scheme of a planning design for MMS can be evaluated effectively.

  17. 78 FR 17835 - Approval and Promulgation of Federal Implementation Plan for Oil and Natural Gas Well Production...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).

  18. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, George Robert

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  19. Modeling, system identification, and control of ASTREX

    NASA Technical Reports Server (NTRS)

    Abhyankar, Nandu S.; Ramakrishnan, J.; Byun, K. W.; Das, A.; Cossey, Derek F.; Berg, J.

    1993-01-01

    The modeling, system identification and controller design aspects of the ASTREX precision space structure are presented in this work. Modeling of ASTREX is performed using NASTRAN, TREETOPS and I-DEAS. The models generated range from simple linear time-invariant models to nonlinear models used for large angle simulations. Identification in both the time and frequency domains are presented. The experimental set up and the results from the identification experiments are included. Finally, controller design for ASTREX is presented. Simulation results using this optimal controller demonstrate the controller performance. Finally the future directions and plans for the facility are addressed.

  20. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Monocacy National Battlefield

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...

  1. 75 FR 36551 - State Highway-Rail Grade Crossing Action Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...

  2. Analysis of The Planning Education in the Light of the Contemporary Trends in Planning

    NASA Astrophysics Data System (ADS)

    Husar, Milan; Ceren Varis, Sila; Ondrejicka, Vladimir

    2017-12-01

    This paper examines the way the planning education is taught and examines the recent trends in the curricula of planning education institutions. The introduction of changing economic systems and planning in the field of education is discussed against these changes. Additionally, the evolution in the planner’s role and how it affects the planning education is discussed. The paper is addressing trends and challenges the countries and their planning changes are facing in 21st century. The trends such as increasing globalization, fuzziness of spatial structures and their borders, complexity and uncertainty and the growing interconnectedness of the world are discussed. Another aim is to prepare a common ground, a platform at the university level for scientific cooperation in the field of planning. This study aims at examining the situation of planning in the contemporary world. The identified challenges include the need for more flexibility in planning and planning education, the emergence of innovations and creativity in planners and planning projects, the necessity of promoting soft skills while keeping the existing technical nature of planning and lastly, the need for more interdisciplinary work. The final part of the paper is discussing the future planning education and recommendations on how the schools of planning should reflect these changes.

  3. Groundwater monitoring well assessment final work plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-10-01

    Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less

  4. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  5. 77 FR 37432 - Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-21

    ...-FF03E00000] Final Springfield Plateau Regional Restoration Plan and Environmental Assessment and Finding of... Springfield Plateau Regional Restoration Plan (Plan) and Environmental Assessment and Finding of No... Springfield Plateau Regional Restoration Plan and Environmental Assessment (77 FR 1717). The public comment...

  6. Mother's home healthcare: emotion work when a child has cancer.

    PubMed

    Clarke, Juanne N

    2006-01-01

    Home healthcare work, involving physical labor, nursing care, medical monitoring, administrative, planning and accounting, advocacy and emotion work, is unpaid and largely invisible. This article, based on focus group interviews with mothers whose children have had cancer, describes one part of their home healthcare labor, their emotion work. Specifically, it examines how mothers: manage the moral imperatives of mothering; think about and try to manage the strong feelings, particularly of fear and uncertainty that they often have when their children are ill with cancer; work to understand and maintain their marital relationships; the strategies that seemed to help; and finally, the self-transformation that many mothers experience. The article concludes with a discussion of the substantive, theoretical, research, and policy implications of emotion work in the provision of home healthcare work.

  7. Development and Testing of Geo-Processing Models for the Automatic Generation of Remediation Plan and Navigation Data to Use in Industrial Disaster Remediation

    NASA Astrophysics Data System (ADS)

    Lucas, G.; Lénárt, C.; Solymosi, J.

    2015-08-01

    This paper introduces research done on the automatic preparation of remediation plans and navigation data for the precise guidance of heavy machinery in clean-up work after an industrial disaster. The input test data consists of a pollution extent shapefile derived from the processing of hyperspectral aerial survey data from the Kolontár red mud disaster. Three algorithms were developed and the respective scripts were written in Python. The first model aims at drawing a parcel clean-up plan. The model tests four different parcel orientations (0, 90, 45 and 135 degree) and keeps the plan where clean-up parcels are less numerous considering it is an optimal spatial configuration. The second model drifts the clean-up parcel of a work plan both vertically and horizontally following a grid pattern with sampling distance of a fifth of a parcel width and keep the most optimal drifted version; here also with the belief to reduce the final number of parcel features. The last model aims at drawing a navigation line in the middle of each clean-up parcel. The models work efficiently and achieve automatic optimized plan generation (parcels and navigation lines). Applying the first model we demonstrated that depending on the size and geometry of the features of the contaminated area layer, the number of clean-up parcels generated by the model varies in a range of 4% to 38% from plan to plan. Such a significant variation with the resulting feature numbers shows that the optimal orientation identification can result in saving work, time and money in remediation. The various tests demonstrated that the model gains efficiency when 1/ the individual features of contaminated area present a significant orientation with their geometry (features are long), 2/ the size of pollution extent features becomes closer to the size of the parcels (scale effect). The second model shows only 1% difference with the variation of feature number; so this last is less interesting for planning optimization applications. Last model rather simply fulfils the task it was designed for by drawing navigation lines.

  8. The Uncertainties on the GIS Based Land Suitability Assessment for Urban and Rural Planning

    NASA Astrophysics Data System (ADS)

    Liu, H.; Zhan, Q.; Zhan, M.

    2017-09-01

    The majority of the research on the uncertainties of spatial data and spatial analysis focuses on some specific data feature or analysis tool. Few have accomplished the uncertainties of the whole process of an application like planning, making the research of uncertainties detached from practical applications. The paper discusses the uncertainties of the geographical information systems (GIS) based land suitability assessment in planning on the basis of literature review. The uncertainties considered range from index system establishment to the classification of the final result. Methods to reduce the uncertainties arise from the discretization of continuous raster data and the index weight determination are summarized. The paper analyzes the merits and demerits of the "Nature Breaks" method which is broadly used by planners. It also explores the other factors which impact the accuracy of the final classification like the selection of class numbers, intervals and the autocorrelation of the spatial data. In the conclusion part, the paper indicates that the adoption of machine learning methods should be modified to integrate the complexity of land suitability assessment. The work contributes to the application of spatial data and spatial analysis uncertainty research on land suitability assessment, and promotes the scientific level of the later planning and decision-making.

  9. FFP/NREL Collaboration on Hydrokinetic River Turbine Testing: Cooperative Research and Development Final Report, CRADA Number CRD-12-00473

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Driscoll, F.

    2013-04-01

    This shared resources CRADA defines collaborations between the National Renewable Energy Laboratory (NREL) and Free Flow Power (FFP) set forth in the following Joint Work Statement. Under the terms and conditions described in this CRADA, NREL and FFP will collaborate on the testing of FFP's hydrokinetic river turbine project on the Mississippi River (baseline location near Baton Rouge, LA; alternate location near Greenville, MS). NREL and FFP will work together to develop testing plans, instrumentation, and data acquisition systems; and perform field measurements.

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Amanda S.; Brosha, Eric

    This is a progress report for the demonstration of a prototype hydrogen sensor and electronics package. There are five tasks associated with this, and four have been completed as of August 2016: Station Demonstration and Site Recommendation, Order Sensor Equipment, Build Sensors, and Install Sensors. The final task to be completed is Sensor Demonstration and Data Analysis, and expected completion date is January 26, 2017. This progress report details each of the tasks and goes into detail about what is currently being worked on, along with the budget and planned work for July 27, 2016 to January 26, 2017.

  11. 77 FR 52054 - Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCAC06000.L16100000.DQ0000.LXSS095B0000] Notice of Availability of the Proposed Bakersfield Resource Management Plan and Final Environmental... prepared the Proposed Resource Management Plan (RMP) and Final Environmental Impact Statement (EIS) for the...

  12. Effect of the Family and Medical Leave Act on the operation of cafeteria plans. Final regulations.

    PubMed

    2001-10-17

    This document contains final regulations relating to cafeteria plans that reflect changes made by the Family and Medical Leave Act of 1993 (Act). The final regulations provide the public with guidance needed to comply with the Act and affect employees who participate in cafeteria plans.

  13. 78 FR 44592 - Final General Management Plan, Final Wilderness Study, and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ... General Management Plan and Wilderness Study (Final EIS/GMP/WS) for Fort Pulaski National Monument... national monument, the Final EIS/GMP/WS will guide the management of the national monument over the next 20... publication of the Environmental Protection Agency's Notice of Availability of the Final EIS/GMP/WS in the...

  14. [Acoustic conditions in open plan office - Application of technical measures in a typical room].

    PubMed

    Mikulski, Witold

    2018-03-09

    Noise in open plan offices should not exceed acceptable levels for the hearing protection. Its major negative effects on employees are nuisance and impediment in execution of work. Specific technical solutions should be introduced to provide proper acoustic conditions for work performance. Acoustic evaluation of a typical open plan office was presented in the article published in "Medycyna Pracy" 5/2016. None of the rooms meets all the criteria, therefore, in this article one of the rooms was chosen to apply different technical solutions to check the possibility of reaching proper acoustic conditions. Acoustic effectiveness of those solutions was verified by means of digital simulation. The model was checked by comparing the results of measurements and calculations before using simulation. The analyzis revealed that open plan offices supplemented with signals for masking speech signals can meet all the required criteria. It is relatively easy to reach proper reverberation time (i.e., sound absorption). It is more difficult to reach proper values of evaluation parameters determined from A-weighted sound pressure level (SPLA) of speech. The most difficult is to provide proper values of evaluation parameters determined from speech transmission index (STI). Finally, it is necessary (besides acoustic treatment) to use devices for speech masking. The study proved that it is technically possible to reach proper acoustic condition. Main causes of employees complaints in open plan office are inadequate acoustic work conditions. Therefore, it is necessary to apply specific technical solutions - not only sound absorbing suspended ceiling and high acoustic barriers, but also devices for speech masking. Med Pr 2018;69(2):153-165. This work is available in Open Access model and licensed under a CC BY-NC 3.0 PL license.

  15. 78 FR 21245 - Continuity of Operations Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  16. Recommendations and Proposed Strategic Plan: Water Sector Decontamination Priorities

    DTIC Science & Technology

    2008-10-01

    safety and health issues of the utility personnel that may be exposed to treatment processes down stream from the treatment Conducting research on...Government Coordinating Council (GCC). This letter serves as our official transmittal of the Work Group’s final product . As the Co-Chairs...Priorities Page xv LIST OF ACRONYMS ACEIH American Council of Education on Industrial Hygiene AMWA Association of Metropolitan Water Agencies ANSI

  17. Cost and Schedule Analytical Techniques Development

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This Final Report summarizes the activities performed by Science Applications International Corporation (SAIC) under contract NAS 8-40431 "Cost and Schedule Analytical Techniques Development Contract" (CSATD) during Option Year 3 (December 1, 1997 through November 30, 1998). This Final Report is in compliance with Paragraph 5 of Section F of the contract. This CSATD contract provides technical products and deliverables in the form of parametric models, databases, methodologies, studies, and analyses to the NASA Marshall Space Flight Center's (MSFC) Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) and other user organizations. Detailed Monthly Reports were submitted to MSFC in accordance with the contract's Statement of Work, Section IV "Reporting and Documentation". These reports spelled out each month's specific work performed, deliverables submitted, major meetings conducted, and other pertinent information. Therefore, this Final Report will summarize these activities at a higher level. During this contract Option Year, SAIC expended 25,745 hours in the performance of tasks called out in the Statement of Work. This represents approximately 14 full-time EPs. Included are the Huntsville-based team, plus SAIC specialists in San Diego, Ames Research Center, Tampa, and Colorado Springs performing specific tasks for which they are uniquely qualified.

  18. 45 CFR 1386.36 - Final disapproval of the State plan or plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF HUMAN DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON DEVELOPMENTAL DISABILITIES, DEVELOPMENTAL DISABILITIES PROGRAM FORMULA GRANT PROGRAMS Federal Assistance to State Developmental Disabilities Councils § 1386.36 Final disapproval of the State plan or plan...

  19. Federal Employees Health Benefits Program: Enrollment Options Following the Termination of a Plan or Plan Option. Final rule.

    PubMed

    2015-10-28

    The U.S. Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) Program regulations regarding enrollment options following the termination of a plan or plan option.

  20. 26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... compensation for A's final 5 plan years is as follows: 1995 plan year $10,500 1994 plan year $20,000 1993 plan... this section, an employee's final pay from the employer as of a plan year is the employee's compensation (as defined in section 414(q)(7)) for the year (ending with or within the 5-plan-year period...

  1. Development of a self-management program for employees with complaints of the arm, neck, and/or shoulder: an intervention mapping approach.

    PubMed

    Hutting, Nathan; Detaille, Sarah I; Engels, Josephine A; Heerkens, Yvonne F; Staal, J Bart; Nijhuis-van der Sanden, Maria Wg

    2015-01-01

    To develop a self-management program with an additional eHealth module, using the six steps of the intervention mapping (IM) protocol, to help employees with complaints of the arm, neck, and/or shoulder (CANS) cope with their problems. In Step 1 of the IM protocol, a needs assessment was performed consisting of a review of the Dutch multidisciplinary guidelines on CANS, and of focus group sessions with employees with CANS (n=15) and with relevant experts (n=17). After the needs assessment, the objectives of the intervention and the determinants of self-management at work were formulated (Step 2). Furthermore, theory-based intervention methods and practical strategies were selected (Step 3), and an intervention program (including the eHealth module) was developed (Step 4). Finally, plans for implementation and evaluation of the program were developed (Steps 5 and 6). Step 1 of the IM protocol revealed that employees with CANS should be stimulated to search for information about the cause of their complaints, about how to deal with their complaints, and in which manner they can influence their complaints themselves. In Step 2, the overall goal of the intervention was defined as "self-management behavior at work" with the aim to alleviate the perceived disability of the participants. Step 3 described how the intervention methods were translated into practical strategies, and goal setting was introduced as an important method for increasing self-efficacy. The product of Step 4 was the final program plan, consisting of 6-weekly group sessions of 2.5 hours each and an eHealth module. In Step 5, a recruitment plan and course materials were developed, a steering committee was set up, trainers were recruited, and the final program was tested. In Step 6, an evaluation plan was developed, which consists of a randomized controlled trial with a 12-month follow-up period and a qualitative evaluation (interviews) with some of the participants. This study resulted in a theory- and practice-based self-management program, based on behavioral change theories, guideline-related evidence, and practice-based knowledge that fits the needs of employees with CANS.

  2. Using Planning, Scheduling and Execution for Autonomous Mars Rover Operations

    NASA Technical Reports Server (NTRS)

    Estlin, Tara A.; Gaines, Daniel M.; Chouinard, Caroline M.; Fisher, Forest W.; Castano, Rebecca; Judd, Michele J.; Nesnas, Issa A.

    2006-01-01

    With each new rover mission to Mars, rovers are traveling significantly longer distances. This distance increase raises not only the opportunities for science data collection, but also amplifies the amount of environment and rover state uncertainty that must be handled in rover operations. This paper describes how planning, scheduling and execution techniques can be used onboard a rover to autonomously generate and execute rover activities and in particular to handle new science opportunities that have been identified dynamically. We also discuss some of the particular challenges we face in supporting autonomous rover decision-making. These include interaction with rover navigation and path-planning software and handling large amounts of uncertainty in state and resource estimations. Finally, we describe our experiences in testing this work using several Mars rover prototypes in a realistic environment.

  3. Computerized physician order entry from a chief information officer perspective.

    PubMed

    Cotter, Carole M

    2004-12-01

    Designing and implementing a computerized physician order entry system in the critical care units of a large urban hospital system is an enormous undertaking. With their significant potential to improve health care and significantly reduce errors, the time for computerized physician order entry or physician order management systems is past due. Careful integrated planning is the key to success, requiring multidisciplinary teams at all levels of clinical and administrative management to work together. Articulated from the viewpoint of the Chief Information Officer of Lifespan, a not-for-profit hospital system in Rhode Island, the vision and strategy preceding the information technology plan, understanding the system's current state, the gap analysis between current and future state, and finally, building and implementing the information technology plan are described.

  4. Medicare program; prohibition of midyear benefit enhancements for Medicare Advantage organizations. Final rule.

    PubMed

    2008-07-28

    This final rule prohibits Medicare Advantage (MA) organizations, including organizations offering MA plans to employer and union group health plan sponsors, from making midyear changes to nonprescription drug benefits, premiums, and cost-sharing submitted in their approved bids for a given contract year. This final rule also clarifies that MA organizations offering certain kinds of plans restricted to employer and union group health plan sponsors and not open to general enrollment may continue to offer benefit enhancements as they do currently, through means other than midyear benefit enhancements (MYBEs). Programs of all-inclusive care for elderly (PACE) are not subject to the provisions of this final rule and may continue to offer enhanced benefits as specified in our guidance for PACE plans.

  5. An honest day's work: pay for performance in a pediatric radiology department.

    PubMed

    Bisset, George S

    2017-06-01

    Compensation models in radiology take a variety of forms, but regardless of practice type, successful models must reward productivity, be simple, and epitomize fairness. The ideal model should also be flexible enough to transition, based upon the changing strategic goals of a department. The plan should be constructed around rewarding the behaviors that the organization values. In this minisymposium article the author presents the value of different types of compensation plans and discusses advantages and disadvantages. Finally, the author presents a pay-for-performance model that has had long-term success at a private-turned-academic practice in pediatric radiology.

  6. Physical aspects of total-body irradiation at the Middlesex Hospital (UCL group of hospitals), London 1988-1993: I. Phantom measurements and planning methods.

    PubMed

    Planskoy, B; Bedford, A M; Davis, F M; Tapper, P D; Loverock, L T

    1996-11-01

    This paper, which is divided into parts I and II, describes the physical aspects of work on total-body irradiation (TBI) at the Middlesex Hospital, London, from 1988 to 1993. Irradiation is fractionated and bi-lateral with horizontal accelerator photon beams of 8 MV (1988-1992) at a source-surface distance (SSD) of 3.36 m and 10 MV (1992-1993) at an SSD of 4.62 m. The main aims were maximum patient comfort, a simple, accurate set-up with overall times per fraction of 30 min or less, dose homogeneity throughout the body within +/- 10 to +/- 15%, pre-irradiation treatment planning on nine CT slices using our commercial IGE RTplan (1988-1992) and Target 2 (1992-1993) treatment planning systems and, most important, verification of the plans by in vivo dosimetry to within +/- 5%. Verification of the planned lung doses, which are distributed over five CT slices, was given special attention. In part I of this paper we describe the preliminary work, most of which was done prior to patient treatment. This consisted of standard dosimetric measurements (central axis depth doses, beam profiles at several depths, build-up and build-down curves, beam output calibrations, effect of body compensators, etc), in evaluating silicon diode dosimeters for in vivo dosimetry and of adapting and verifying the methods of treatment planning for TBI conditions. The results obtained with phantoms, including a Rando body phantom, showed that, in principle, our aims could be achieved. The final proof depended, however, on an analysis of the results of the in vivo work and this forms the subject of part II of this paper.

  7. AutoLock: a semiautomated system for radiotherapy treatment plan quality control

    PubMed Central

    Lowe, Matthew; Hardy, Mark J.; Boylan, Christopher J.; Whitehurst, Philip; Rowbottom, Carl G.

    2015-01-01

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock. PACS number: 87.55.Qr PMID:26103498

  8. AutoLock: a semiautomated system for radiotherapy treatment plan quality control.

    PubMed

    Dewhurst, Joseph M; Lowe, Matthew; Hardy, Mark J; Boylan, Christopher J; Whitehurst, Philip; Rowbottom, Carl G

    2015-05-08

    A semiautomated system for radiotherapy treatment plan quality control (QC), named AutoLock, is presented. AutoLock is designed to augment treatment plan QC by automatically checking aspects of treatment plans that are well suited to computational evaluation, whilst summarizing more subjective aspects in the form of a checklist. The treatment plan must pass all automated checks and all checklist items must be acknowledged by the planner as correct before the plan is finalized. Thus AutoLock uniquely integrates automated treatment plan QC, an electronic checklist, and plan finalization. In addition to reducing the potential for the propagation of errors, the integration of AutoLock into the plan finalization workflow has improved efficiency at our center. Detailed audit data are presented, demonstrating that the treatment plan QC rejection rate fell by around a third following the clinical introduction of AutoLock.

  9. [Activities of System Studies and Simulation, Inc.

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Contents include the following: 1. Launch Vehicle Interface Work Performed: a. S3 provided to KSC the new launch inclination targets needed for the April '04 launch date. 2. Prelaunch operations work performed: a. S3 updated the staffing plan for MSFC on-console personnel\\during the Final Countdown prior to launch. 3. Software Assessment Work Performed: a. S3 evaluated and recommended approval for Program Control Board (PCB) proposed change 649 for ground software changes, as well as change 650 and 650A for Stored Program Commands. 4. Education and Public Outreach Work Performed: a. S3 continues to coordinate the effort for the design and fabrication of scale models of the GP-3 for use at the launch site, education forums, and management/technical briefings. S3 also prepared a Change Request for additional funds needed for fabrication of additional scale models. S3 drafted the planned uses of these models, including the possibility of participation in the Boston, MA showings of the traveling Einstein Exhibit. 5. Program Management Support Work Performed: a. S3 prepared the input for and closed three MSFC Centerwide Action Item Tracking Systems (CAITS) actions during this period.

  10. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  11. Additional Technologies and Investigations for Provision of Future Aeronautical Communications

    NASA Technical Reports Server (NTRS)

    Gilbert, Tricia; Jin, Jenny; Berger, Jason; Henriksen, Steve

    2008-01-01

    The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.

  12. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.3, Revision 1 on Physical Security--Early... NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.3, Revision 1 on Physical Security...

  13. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan Section 13.6.2, Revision 1 on Physical Security--Design... issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.2, Revision 1 on Physical Security--Design Certification...

  14. 75 FR 68009 - Office of New Reactors; Notice of Availability of the Final Staff Guidance Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ... the Final Staff Guidance Standard Review Plan, Section 13.6.1, Revision 1 on Physical Security... Availability. SUMMARY: The NRC is issuing its Final Revision 1 to NUREG-0800, ``Standard Review Plan (SRP) for the Review of Safety Analysis Reports for Nuclear Power Plants,'' Section 13.6.1, Revision 1 on...

  15. Universal field matching in craniospinal irradiation by a background-dose gradient-optimized method.

    PubMed

    Traneus, Erik; Bizzocchi, Nicola; Fellin, Francesco; Rombi, Barbara; Farace, Paolo

    2018-01-01

    The gradient-optimized methods are overcoming the traditional feathering methods to plan field junctions in craniospinal irradiation. In this note, a new gradient-optimized technique, based on the use of a background dose, is described. Treatment planning was performed by RayStation (RaySearch Laboratories, Stockholm, Sweden) on the CT scans of a pediatric patient. Both proton (by pencil beam scanning) and photon (by volumetric modulated arc therapy) treatments were planned with three isocenters. An 'in silico' ideal background dose was created first to cover the upper-spinal target and to produce a perfect dose gradient along the upper and lower junction regions. Using it as background, the cranial and the lower-spinal beams were planned by inverse optimization to obtain dose coverage of their relevant targets and of the junction volumes. Finally, the upper-spinal beam was inversely planned after removal of the background dose and with the previously optimized beams switched on. In both proton and photon plans, the optimized cranial and the lower-spinal beams produced a perfect linear gradient in the junction regions, complementary to that produced by the optimized upper-spinal beam. The final dose distributions showed a homogeneous coverage of the targets. Our simple technique allowed to obtain high-quality gradients in the junction region. Such technique universally works for photons as well as protons and could be applicable to the TPSs that allow to manage a background dose. © 2017 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  16. GPS net­work operations for the International GPS Geodynamics Service

    USGS Publications Warehouse

    Neilan, Ruth E.

    1993-01-01

    As GPS technology comes of age in the 1990’s, it is evident that an internationally sponsored GPS tracking system is called for to provide consistent, timely ground tracking data and data products to the geophysical community. The planning group for the International GPS Geodynamics Service (IGS), sponsored by the International Association of Geodesy (IAG), is addressing all elements of the end-to-end tracking system, ranging from data collection to data analysis and distribution of products (Mueller, 1992). Part of the planning process is to formulate how these various elements work together to create the common infrastructure needed to support a wide variety of GPS investigations. A key element for any permanent satellite tracking system is certainly the acquisition segment; the reliability and robustness of the ground network operations directly determine the fates and limitations of final products. The IGS planning group therefore included a committee tasked to develop and establish standards governing data acquisition and site-specific characteristics deemed necessary to ensure the collection of a high quality, continuous data set.

  17. Ecology of Greater Sage-Grouse in the Bi-State Planning Area Final Report, September 2007

    USGS Publications Warehouse

    Casazza, Michael L.; Overton, Cory T.; Farinha, Melissa A.; Torregrosa, Alicia; Fleskes, Joseph P.; Miller, Michael R.; Sedinger, James S.; Kolada, Eric J.

    2009-01-01

    Conservation efforts for greater sage-grouse (Centrocercus urophasianus), hereafter sage-grouse, are underway across the range of this species. Over 70 local working groups have been established and are implementing on-the-ground sage-grouse oriented conservation projects. Early on in this process, the California Department of Fish and Game (CDFG) recognized the need to join in these efforts and received funding from the U.S. Fish and Wildlife Service (USFWS) under the Candidate Species Conservation Program to help develop a species conservation plan for sage-grouse in the Mono County area. This conservation plan covers portions of Alpine, Mono, and Inyo counties in California and Douglas, Esmeralda, Lyon, and Mineral counties in Nevada. A concurrent effort underway through the Nevada Governor's Sage-grouse Conservation Team established Local Area Working Groups across Nevada and eastern California. The Mono County populations of sage-grouse were encompassed by the Bi-State Local Planning Area, which was comprised of six population management units (PMUs). The state agencies from California (CDFG) and Nevada (Nevada Department of Wildlife; NDOW) responsible for the management of sage-grouse agreed to utilize the process that had begun with the Nevada Governor's Team in order to develop local plans for conservation planning and implementation. Resources from the USFWS were applied to several objectives in support of the development of the Bi-State Local Area Sage-grouse Conservation Plan through a grant to the U.S. Geological Survey (USGS). Objectives included: (1) participate in the development of the Bi-State Conservation Plan, (2) compile and synthesize existing sage-grouse data, (3) document seasonal movements of sage-grouse, (4) identify habitats critical to sage-grouse, (5) determine survival rates and identify causal factors of mortality, (6) determine nest success and brood success of sage-grouse, and (7) identify sage-grouse lek sites. Progress reports completed in 2004 and 2005 addressed each of the specific objectives and this final report focuses on the biological information gathered in support of local conservation efforts. Participation in the development of the Bi-State Local Area Conservation Plan was accomplished on multiple scales. Beginning in the fall of 2002, USGS personnel began participating in meetings of local stakeholders involved in the development of a sage-grouse conservation plan for the Bi-State planning area. This included attendance at numerous local PMU group meetings and field trips as well as participating on the technical advisory committee (TAC) for the Bi-State group. Whenever appropriate, ongoing results and findings regarding sage-grouse ecology in the local area were incorporated into these working group meetings. In addition, the USGS partnered with CDFG to help reorganize one of the local PMU groups (South Mono) and edited that portion of the Bi-State plan. The USGS also worked closely with CDFG to draft a description of the state of knowledge for sage-grouse genetic information for inclusion in the Bi-State Conservation Plan. The first edition of the Bi-State Conservation Plan for Greater Sage-Grouse was completed in June 2004 (Bi-State Sage-grouse Conservation Team 2004). This report is organized primarily by PMU to facilitate the incorporation of these research findings into the individual PMU plans that compose the Bi-State plan. Information presented in this report was derived from over 7,000 radio-telemetry locations obtained on 145 individual sage-grouse during a three year period (2003-2005). In addition, we collected detailed vegetation measurements at over 590 habitat sampling plots within the study area including canopy cover, shrubs, forbs, and grasses diversity. Vegetation data collection focused on sage-grouse nests, and brood-use areas. Additionally we collected data at random sites to examine sage-grouse habitat relationships within the study area. The majori

  18. Current employment characteristics and career intentions of Lithuanian dentists.

    PubMed

    Janulyte, Vilija; Aleksejuniene, Jolanta; Puriene, Alina; Peciuliene, Vytaute; Benzian, Habib

    2014-12-20

    The present survey explored the current employment profile and future career intentions of Lithuanian general dentists and specialists. A census sampling method was employed with data collected by means of a structured questionnaire that inquired about demographics, different employment-related aspects (practice type and location, working hours, perceived lack of patients, etc.), and future career intentions (intent to emigrate, to change profession, or the timing of retirement). The final response rate was 67.6% corresponding to 2,008 respondents. The majority of all dentists work full or part-time in the private dental sector, more than one third of them owns a private practice or rents a dental chair. A minority of dentists works in the public dental sector. According to the survey, 26.6% of general dentists and 39.2% of dental specialists works overtime (> 40 hours per week; P < 0.001) and practice in multiple clinics (1.4 ± 0.6 and 2.0 ± 1.2, respectively; P < 0.001). One third of general dentists (31.3%) and dental specialists (31.4%) stated to have a low number of patients (P > 0.05). The majority (68.9% of general dentists and 65.9% of dental specialists) plans to work after the retirement age (P > 0.05). Emigration as an option for their professional career is being considered by 10.8% of general dentists and 8.3% of dental specialists (P > 0.05). Working either full or part-time in private practices (OR = 4.3) and younger age (≤ 35 years; OR = 2.2) are the two strongest predictors for a perceived insufficient number of patients. One third of dentists in Lithuania work long hours and lack patients. Many dentists practice in multiple locations and plan to retire after the official retirement age. Some dentists and dental specialists plan to emigrate. The perceived shortcomings within the dental care system and workforce planning of dentists need to be addressed.

  19. Focused Feasibility Study Final Field Sampling Plan

    DTIC Science & Technology

    1993-10-01

    baseline of groundwater chemistry prior to commencing additional environmental investigations of the area. Work for Phase I of the FFS is designed lo...investigations and remedial feasibility investigations at Beach Point. The groundwater data will also be used to aid in the design of any groundwater extraction...approved laboratories. The analytical data will be the equivalent of EPA Level IV data. This level of data quality has been established for environmental

  20. How to benefit from the coming RBRVS changes.

    PubMed

    Doherty, R B; Ogrod, E S

    1989-09-01

    The Physician Payment Review Commission's endorsement of the Resource-Based Relative Value Scale (RBRVS) represents a major step in reform of the Medicare payment system. Under this plan, cognitive services finally would be reimbursed at the same level for the work involved. The authors present a closer look at the commission's recommendations and discuss how these might substantially improve payment of primary care physicians. They also describe how to get ready.

  1. Remote Excavation of Heavily Contaminated UXO Sites. The Range Master

    DTIC Science & Technology

    2007-09-05

    NUMBER 5c. PROGRAM ELEMENT NUMBER 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND...Master) ESTCP Project UX-200327 ii Final Phase II Report, September 2007 3.5.5 Sampling Plan...Explosive HSP Health and Safety Program HTRW Hazardous, Toxic, and Radioactive Waste HTW Hazardous and Toxic Waste HW Hazardous Waste IAW In

  2. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daley, Thomas M.; Vasco, Don; Ajo-Franklin, Jonathan

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storagemore » (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.« less

  3. Arizona Air Quality State Implementation Plans; Final Approval; Douglas, Arizona; Second 10-Year Sulfur Dioxide Maintenance Plan

    EPA Pesticide Factsheets

    EPA is taking final rulemaking action to approve, as part of the State Implementation Plan (SIP) for the State of Arizona, the second 10-year maintenance plan for the Douglas maintenance area for the 1971 National Ambient Air Quality Standards for SO2.

  4. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.

  5. Final rules relating to use of electronic communication and recordkeeping technologies by employee pension and welfare benefit plans. Notice of final rulemaking.

    PubMed

    2002-04-09

    This document contains final rules under Title I of the Employee Retirement Income Security Act of 1974, as amended (ERISA), concerning the disclosure of certain employee benefit plan information through electronic media, and the maintenance and retention of employee benefit plan records in electronic form. The rules establish a safe harbor pursuant to which all pension and welfare benefit plans covered by Title I of ERISA may use electronic media to satisfy disclosure obligations under Title I of ERISA. The rules also provide standards concerning the use of electronic media in the maintenance and retention of records required by sections 107 and 209 of ERISA. The rules affect employee pension and welfare benefit plans, including group health plans, plan sponsors, administrators and fiduciaries, and plan participants and beneficiaries.

  6. Summary of a Gas Transport Tracer Test in the Deep Cerros Del Rio Basalts, Mesita del Buey, Los Alamos NM.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stauffer, Philip H.; Rahn, Thomas A.; Ortiz, John Philip

    Here we describe results from a tracer test in the Cerros del Rio basalt beneath Mesita del Buey, Technical Area 54 (TA-54) at Los Alamos National Laboratory (LANL or the Laboratory). This report follows from plans outlined in our previous Tracer Test Work Plan (LANL 2016). These activities were conducted by LANL to further characterize subsurface properties of the Cerros del Rio basalts at Material Disposal Area (MDA) L (Figure 1.1-1). The work presented follows from the “Interim Measures Work Plan for Soil-Vapor Extraction of Volatile Organic Compounds from Material Disposal Area L, Technical Area 54, Revision 1,” submitted tomore » the New Mexico Environment Department (NMED) in September 2014 (LANL 2014). Remediation of the MDA L vapor plume by soil-vapor extraction (SVE) is recommended as part of the final remedy in the “Corrective Measures Evaluation Report for Material Disposal Area L, Solid Waste Management Unit 54-006, at Technical Area 54, Revision 2” to meet a remedial action objective of preventing groundwater from being impacted above a regulatory standard by the transport of volatile organic compounds (VOCs) to groundwater through soil vapor (LANL 2011).« less

  7. Strategic planning in a complex academic environment: lessons from one academic health center.

    PubMed

    Levinson, Wendy; Axler, Helena

    2007-08-01

    Leaders in academic health centers (AHCs) must create a vision for their academic unit embedded in a complex environment. A formal strategic planning process can be valuable to help shape a clear vision taking advantage of potential collaborations and to develop specific achievable long- and short-term goals. The authors describe the steps in a formal strategic planning process and illustrate it with the example of the Department of Medicine at the University of Toronto Faculty of Medicine beginning in 2004. The process included the active participation of over 300 faculty members, trainees, and stakeholders of the department and resulted in broad-based support and leadership for the resulting plan. The authors describe the steps, which include getting started, committing to planning principles, establishing the work plan, understanding the environment, pulling it all together, shaping the vision, testing strategic directions, building effective implementation, and promoting the plan. Articulation of vision, mission, and values informed the plan's development, as well as 10 key principles integral to the plan. Challenges and lessons learned are also described. The final strategic plan is an active core activity of the department, guiding decisions and resource allocation and facilitating measurement of success or shortcomings. The process the authors describe is applicable to multiple academic units, including divisions/sections, departments, or thematic programs in AHCs.

  8. Seattle To Portland Inter-City ITS Corridor Study And Communications Plan, Final Report

    DOT National Transportation Integrated Search

    1996-03-01

    THIS DOCUMENT IS THE FINAL REPORT PRESENTING THE SEATTLE TO PORTLAND INTELLIGENT TRANSPORTATION SYSTEM (ITS) EARLY DEPLOYMENT PLAN. THE FINAL REPORT SYNTHESIZES INFORMATION FROM TECHNICAL MEMORANDUMS 1 THROUGH 5; INCLUDING EXISTING AND FUTURE CONDITI...

  9. Comments on "Women, Development Planning and Government Policies in Pakistan".

    PubMed

    Hafeez, S

    1992-01-01

    Commentary on Shahnaz and Bilquees Raza's paper on women in development in Pakistan is supportive of the content analysis of the Sixth and Seventh 5-Year Plans and policies, but critical of the methods used n the analysis. The parallel to survey research methods was made in that there was a specification of 1) the unit of analysis (reference to each policy measure, each chapter, each page of the plan), 2) the rationale for the plan, 3) specific objectives of the examination, and 4) the criteria for analysis. Missing also was the identification of policy trends from the Fourth and Fifth 5-Year Plans. The question is never answered as to why gender issues were not directed to the agricultural sector. The conclusion that there was a hugh gap between intentions and implementation was an issue not unique to women's issues, and a deeper analysis may have been required in order to understand the nature and magnitude of the gaps for women's policies and their productive roles. Questions should have been directed to the issues of the root causes of gaps in planning and implementation of policies and programs for women in development, and the identification of quantitative and qualitative indicators of gaps. Questions arise as to whether the gaps have changed with changes in the strength of political and social will in various decades. Recognition was given by the authors to the low budget allocations between 1955 and 1970 to education and health which affected both men and women, but there was scant mention of the strong social, not political, will to enhance women's welfare prevalent at this time. Information was lacking on the differences between the Sixth and Seventh sectoral plans for agricultural employment and women and the working groups plans that did include women in agricultural employment; the question is why the working plans were not incorporated into the final plans, and why the working groups did not protest this omission. The lack of political and social will was one of the most significant gaps between policy and implementation that was the article's focus. Has the Ministry of Women in Development really been given administrative authority to promote social change?

  10. Career choices of today's medical students: where does surgery rank?

    PubMed

    Boyle, E; Healy, D; Hill, A D K; O'Connell, P R; Kerin, M; McHugh, S; Coyle, P; Kelly, J; Walsh, S R; Coffey, J C

    2013-09-01

    The national junior doctor recruitment crisis prompts an appraisal of medical student attitudes to different career pathways. The purpose of this study was to perform a national review of surgical career intentions of Irish final year medical students. Ethical and institutional approval was obtained at each study location. A questionnaire was designed and distributed to final year students. Domains assessed included demographics, career plans and reasons associated. Anonymised responses were collated and evaluated. Categorical data were compared with Fisher's exact test. Responses were obtained from 342 students in four medical schools of whom 78.6% were undergraduates. Over half (53%) were Irish, with Malaysia, Canada and the USA the next most common countries of origin. Only 18% of students intended to pursue surgery, with 60% stating they did not plan to, and 22% undecided. Of those who plan not to pursue surgery, 28% were unsure about a speciality but the most common choices were medicine (39%), general practice (16%) and paediatrics (8%). Reasons for not picking a career in surgery included long hours and the unstructured career path. Suggestions to improve uptake included earlier and more practical exposure to surgery, improved teaching/training and reduction in working hours. In this study 18% of final year medical students identified surgery as their chosen career pathway. Although lifestyle factors are significant in many students' decision, perceived quality and duration of surgical training were also relevant and are modifiable factors which, if improved could increase interest in surgery as a career.

  11. Amendment to the interim final rules for group health plans and health insurance coverage relating to status as a grandfathered health plan under the Patient Protection and Affordable Care Act. Amendment to interim final rules with request for comments.

    PubMed

    2010-11-17

    This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  12. Excavated Soils Management Plan for AOCs 44 and 52, Fort Devens

    DTIC Science & Technology

    1994-05-01

    I FORT DEVENS AOCs 44 AND 52 I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN DATA ITEM A009I I U 20070424310 I CONTRACT DAAA15-91-D-0008 I U.S. ARMY...obselete FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS Prepared for. U.S. Army Enviromnental Center Aberdeen Proving Ground, Maryland...BLANK 3 I I I I I I I I I I FINAL EXCAVATED SOILS MANAGEMENT PLAN FOR AOCs 44 AND 52 FORT DEVENS TABLE OF CONTENTS 1 Section Title Page No. 1.0

  13. Wyoming Basin Rapid Ecoregional Assessment: Work Plan

    USGS Publications Warehouse

    Carr, Natasha B.; Garman, Steven L.; Walters, Annika; Ray, Andrea; Melcher, Cynthia P.; Wesner, Jeff S.; O’Donnell, Michael S.; Sherrill, Kirk R.; Babel, Nils C.; Bowen, Zachary H.

    2013-01-01

    The overall goal of the Rapid Ecoregional Assessments (REAs) being conducted for the Bureau of Land Management (BLM) is to provide information that supports regional planning and analysis for the management of ecological resources. The REA provides an assessment of baseline ecological conditions, an evaluation of current risks from drivers of ecosystem change, and a predictive capacity for evaluating future risks. The REA also may be used for identifying priority areas for conservation or restoration and for assessing the cumulative effects of a variety of land uses. There are several components of the REAs. Management Questions, developed by the BLM and partners for the ecoregion, identify the information needed for addressing land-management responsibilities. Conservation Elements represent regionally significant aquatic and terrestrial species and communities that are to be conserved and (or) restored. The REA also will evaluate major drivers of ecosystem change (Change Agents) currently affecting or likely to affect the status of Conservation Elements. We selected 8 major biomes and 19 species or species assemblages to be included as Conservation Elements. We will address the four primary Change Agents—development, fire, invasive species, and climate change—required for the REA. The purpose of the work plan for the Wyoming Basin REA is to document the selection process for, and final list of, Management Questions, Conservation Elements, and Change Agents. The work plan also presents the overall assessment framework that will be used to assess the status of Conservation Elements and answer Management Questions.

  14. 78 FR 34918 - Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Environmental Management (IDEM) submitted the State Plan on February 27, 2013. The State Plan is consistent with... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2013-0372; FRL-9821-1] Direct Final Approval of Sewage Sludge Incinerators State Plan for Designated Facilities and Pollutants; Indiana AGENCY...

  15. National Institute on Disability and Rehabilitation Research--Notice of Final Long-Range Plan for Fiscal Years 2005-2009. Federal Register, Part III: Department of Education

    ERIC Educational Resources Information Center

    National Archives and Records Administration, 2006

    2006-01-01

    The Assistant Secretary for Special Education and Rehabilitative Services (OSERS) publishes the Final Long-Range Plan (Final Plan) for the National Institute on Disability and Rehabilitation Research (NIDRR) for FY 2005 through 2009. As required by the Rehabilitation Act of 1973, as amended (Act), the Assistant Secretary takes this action to…

  16. Visual Uav Trajectory Plan System Based on Network Map

    NASA Astrophysics Data System (ADS)

    Li, X. L.; Lin, Z. J.; Su, G. Z.; Wu, B. Y.

    2012-07-01

    The base map of the current software UP-30 using in trajectory plan for Unmanned Aircraft Vehicle is vector diagram. UP-30 draws navigation points manually. But in the field of operation process, the efficiency and the quality of work is influenced because of insufficient information, screen reflection, calculate inconveniently and other factors. If we do this work in indoor, the effect of external factors on the results would be eliminated, the network earth users can browse the free world high definition satellite images through downloading a client software, and can export the high resolution image by standard file format. This brings unprecedented convenient of trajectory plan. But the images must be disposed by coordinate transformation, geometric correction. In addition, according to the requirement of mapping scale ,camera parameters and overlap degree we can calculate exposure hole interval and trajectory distance between the adjacent trajectory automatically . This will improve the degree of automation of data collection. Software will judge the position of next point according to the intersection of the trajectory and the survey area and ensure the position of point according to trajectory distance. We can undertake the points artificially. So the trajectory plan is automatic and flexible. Considering safety, the date can be used in flying after simulating flight. Finally we can export all of the date using a key

  17. Support to LANL: Cost estimation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less

  18. National Ignition Facility: Experimental plan

    NASA Astrophysics Data System (ADS)

    1994-05-01

    As part of the Conceptual Design Report (CDR) for the National Ignition Facility (NIF), scientists from Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Sandia National Laboratory (SNL), the University of Rochester's Laboratory for Laser Energetics (UR/LLE), and EG&G formed an NIF Target Diagnostics Working Group. The purpose of the Target Diagnostics Working Group is to prepare conceptual designs of target diagnostics for inclusion in the facility CDR and to determine how these specifications impact the CDR. To accomplish this, a subgroup has directed its efforts at constructing an approximate experimental plan for the ignition campaign of the NIF CDR. The results of this effort are contained in this document, the Experimental Plan for achieving fusion ignition in the NIF. This group initially concentrated on the flow-down requirements of the experimental campaign leading to ignition, which will dominate the initial efforts of the NIF. It is envisaged, however, that before ignition, there will be parallel campaigns supporting weapons physics, weapons effects, and other research. This plan was developed by analyzing the sequence of activities required to finally fire the laser at the level of power and precision necessary to achieve the conditions of an ignition hohlraum target, and to then use our experience in activating and running Nova experiments to estimate the rate of completing these activities.

  19. The planning coordinator: A design architecture for autonomous error recovery and on-line planning of intelligent tasks

    NASA Technical Reports Server (NTRS)

    Farah, Jeffrey J.

    1992-01-01

    Developing a robust, task level, error recovery and on-line planning architecture is an open research area. There is previously published work on both error recovery and on-line planning; however, none incorporates error recovery and on-line planning into one integrated platform. The integration of these two functionalities requires an architecture that possesses the following characteristics. The architecture must provide for the inclusion of new information without the destruction of existing information. The architecture must provide for the relating of pieces of information, old and new, to one another in a non-trivial rather than trivial manner (e.g., object one is related to object two under the following constraints, versus, yes, they are related; no, they are not related). Finally, the architecture must be not only a stand alone architecture, but also one that can be easily integrated as a supplement to some existing architecture. This thesis proposal addresses architectural development. Its intent is to integrate error recovery and on-line planning onto a single, integrated, multi-processor platform. This intelligent x-autonomous platform, called the Planning Coordinator, will be used initially to supplement existing x-autonomous systems and eventually replace them.

  20. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ... Implementation Plan; Prevention of Significant Deterioration; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing a limited Federal Implementation Plan (FIP) for the North Coast Unified Air Quality Management...

  1. 29 CFR 1952.313 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...

  2. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  3. 29 CFR 1952.294 - Final approval determination.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...

  4. Nonacademic Attributes Predict Medical and Nursing Student Intentions to Emigrate or to Work Rurally: An Eight-Country Survey in Asia and Africa

    PubMed Central

    Silvestri, David M.; Blevins, Meridith; Wallston, Kenneth A.; Afzal, Arfan R.; Alam, Nazmul; Andrews, Ben; Derbew, Miliard; Kaur, Simran; Mipando, Mwapatsa; Mkony, Charles A.; Mwachaka, Philip M.; Ranjit, Nirju; Vermund, Sten H.

    2017-01-01

    We sought to identify independent, nonacademic predictors of medical and nursing student intent to migrate abroad or from rural to urban areas after graduation in low- and middle-income countries (LMIC). This was a cross-sectional survey of 3,199 first- and final-year medical and nursing students at 16 training institutions in eight LMIC. Questionnaires assessed demographics, career intentions, and preferences regarding selected career, location, and work-related attributes. Using principal component analysis, student preferences were reduced into four discrete categories of priorities: 1) work environment resources, 2) location livability, 3) altruistic job values, and 4) individualistic job values. Students' preferences were scored in each category. Using students' characteristics and priority scores, multivariable proportional odds models were used to derive independent predictors of intentions to emigrate for work outside the country, or to work in a rural area in their native country. Students prioritizing individualistic values more often planned international careers (adjusted odds ratio [aOR] = 1.44, 95% confidence interval [CI] = 1.16–1.78), whereas those prioritizing altruistic values preferred rural careers (aOR = 1.82, 95% CI = 1.50–2.21). Trainees prioritizing high-resource environments preferentially planned careers abroad (aOR = 1.38, 95% CI = 1.12–1.69) and were unlikely to seek rural work (aOR = 0.60, 95% CI = 0.49–0.73). Independent of their priorities, students with prolonged prior rural residence were unlikely to plan emigration (aOR = 0.67, 95% CI = 0.50–0.90) and were more likely to plan a rural career (aOR = 1.53, 95% CI = 1.16–2.03). We conclude that use of nonacademic attributes in medical and nursing admissions processes would likely increase retention in high-need rural areas and reduce emigration “brain drain” in LMIC. PMID:28719284

  5. After Saddam: Prewar Planning and the Occupation of Iraq

    DTIC Science & Technology

    2008-01-01

    or capitulated” and “regime leaders dead, apprehended, or marginalized .” Finally, Franks briefed his overarching concept for Phase IV, “post...State Depart- ment officials believed that they were marginalized because State was seen as not supporting the possible war with Iraq.41 Whatever the...Future of Iraq project continued its work throughout 2002 and early 2003, the State Department as a whole remained on the margins of the postwar

  6. A primer for effective organization of professional conferences.

    PubMed

    Werner, Susan E; Kenefick, Colleen

    2005-01-01

    The challenge of organizing a successful conference is a tremendous commitment requiring extensive preparation and teamwork. It is tempting but dangerous to underestimate the details needed to coordinate an outstanding event. Conferences follow a natural life cycle from proposal, gaining administrative support, planning, implementing, and then finally evaluating outcomes. These guidelines identify the tasks and areas of responsibilities required including setting objectives, budgeting, selecting a venue, publicity, programming, and working with vendors.

  7. UNIVERSITY RESEARCH PROGRAM IN ROBOTICS, Final Technical Annual Report, Project Period: 9/1/04 - 8/31/05

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James S. Tulenko; Carl D. Crane III

    The University Research Program in Robotics (URPR) Implementation Plan is an integrated group of universities performing fundamental research that addresses broad-based robotics and automation needs of the NNSA Directed Stockpile Work (DSW) and Campaigns. The URPR mission is to provide improved capabilities of robotics science and engineering to meet the future needs of all weapon systems and other associated NNSA/DOE activities.

  8. U.S. Army Medical Materiel Development Activity, 1987 Annual Report

    DTIC Science & Technology

    1988-05-06

    Argentina to determine efficacy of the Candid #1 vaccine in both immune and nonimmune populations. 12 %0 0 Shigella Vaccines are oral products containing...in Cebus monkeys at the University of Lowell, MA. Working groups were convened to outline clinical testing of the TAP and to finalize the draft...measure exposure rates. Data collected from these studies will be used to plan field trials for vaccines that have been developed including Shigella

  9. River Corridor Cleanup Contract Fiscal Year 2006 Detailed Work Plan: D4 Project/Reactor ISS Closure Projects Field Remediation Project Waste Operations Project End State and Final Closure Project Mission/General Support, Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Project Integration

    2005-09-26

    The Hanford Site contains many surplus facilities and waste sites that remain from plutonium production activities. These contaminated facilities and sites must either be stabilized and maintained, or removed, to prevent the escape of potentially hazardous contaminants into the environment and exposure to workers and the public.

  10. Comparison of treatment plans: a retrospective study by the method of radiobiological evaluation

    NASA Astrophysics Data System (ADS)

    Puzhakkal, Niyas; Kallikuzhiyil Kochunny, Abdullah; Manthala Padannayil, Noufal; Singh, Navin; Elavan Chalil, Jumanath; Kulangarakath Umer, Jamshad

    2016-09-01

    There are many situations in radiotherapy where multiple treatment plans need to be compared for selection of an optimal plan. In this study we performed the radiobiological method of plan evaluation to verify the treatment plan comparison procedure of our clinical practice. We estimated and correlated various radiobiological dose indices with physical dose metrics for a total of 30 patients representing typical cases of head and neck, prostate and brain tumors. Three sets of plans along with a clinically approved plan (final plan) treated by either Intensity Modulated Radiation Therapy (IMRT) or Rapid Arc (RA) techniques were considered. The study yielded improved target coverage for final plans, however, no appreciable differences in doses and the complication probabilities of organs at risk were noticed. Even though all four plans showed adequate dose distributions, from dosimetric point of view, the final plan had more acceptable dose distribution. The estimated biological outcome and dose volume histogram data showed least differences between plans for IMRT when compared to RA. Our retrospective study based on 120 plans, validated the radiobiological method of plan evaluation. The tumor cure or normal tissue complication probabilities were found to be correlated with the corresponding physical dose indices.

  11. Robotic-Arm Assisted Total Knee Arthroplasty Demonstrated Greater Accuracy and Precision to Plan Compared with Manual Techniques.

    PubMed

    Hampp, Emily L; Chughtai, Morad; Scholl, Laura Y; Sodhi, Nipun; Bhowmik-Stoker, Manoshi; Jacofsky, David J; Mont, Michael A

    2018-05-01

    This study determined if robotic-arm assisted total knee arthroplasty (RATKA) allows for more accurate and precise bone cuts and component position to plan compared with manual total knee arthroplasty (MTKA). Specifically, we assessed the following: (1) final bone cuts, (2) final component position, and (3) a potential learning curve for RATKA. On six cadaver specimens (12 knees), a MTKA and RATKA were performed on the left and right knees, respectively. Bone-cut and final-component positioning errors relative to preoperative plans were compared. Median errors and standard deviations (SDs) in the sagittal, coronal, and axial planes were compared. Median values of the absolute deviation from plan defined the accuracy to plan. SDs described the precision to plan. RATKA bone cuts were as or more accurate to plan based on nominal median values in 11 out of 12 measurements. RATKA bone cuts were more precise to plan in 8 out of 12 measurements ( p  ≤ 0.05). RATKA final component positions were as or more accurate to plan based on median values in five out of five measurements. RATKA final component positions were more precise to plan in four out of five measurements ( p  ≤ 0.05). Stacked error results from all cuts and implant positions for each specimen in procedural order showed that RATKA error was less than MTKA error. Although this study analyzed a small number of cadaver specimens, there were clear differences that separated these two groups. When compared with MTKA, RATKA demonstrated more accurate and precise bone cuts and implant positioning to plan. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  12. Monte Carlo treatment planning with modulated electron radiotherapy: framework development and application

    NASA Astrophysics Data System (ADS)

    Alexander, Andrew William

    Within the field of medical physics, Monte Carlo radiation transport simulations are considered to be the most accurate method for the determination of dose distributions in patients. The McGill Monte Carlo treatment planning system (MMCTP), provides a flexible software environment to integrate Monte Carlo simulations with current and new treatment modalities. A developing treatment modality called energy and intensity modulated electron radiotherapy (MERT) is a promising modality, which has the fundamental capabilities to enhance the dosimetry of superficial targets. An objective of this work is to advance the research and development of MERT with the end goal of clinical use. To this end, we present the MMCTP system with an integrated toolkit for MERT planning and delivery of MERT fields. Delivery is achieved using an automated "few leaf electron collimator" (FLEC) and a controller. Aside from the MERT planning toolkit, the MMCTP system required numerous add-ons to perform the complex task of large-scale autonomous Monte Carlo simulations. The first was a DICOM import filter, followed by the implementation of DOSXYZnrc as a dose calculation engine and by logic methods for submitting and updating the status of Monte Carlo simulations. Within this work we validated the MMCTP system with a head and neck Monte Carlo recalculation study performed by a medical dosimetrist. The impact of MMCTP lies in the fact that it allows for systematic and platform independent large-scale Monte Carlo dose calculations for different treatment sites and treatment modalities. In addition to the MERT planning tools, various optimization algorithms were created external to MMCTP. The algorithms produced MERT treatment plans based on dose volume constraints that employ Monte Carlo pre-generated patient-specific kernels. The Monte Carlo kernels are generated from patient-specific Monte Carlo dose distributions within MMCTP. The structure of the MERT planning toolkit software and optimization algorithms are demonstrated. We investigated the clinical significance of MERT on spinal irradiation, breast boost irradiation, and a head and neck sarcoma cancer site using several parameters to analyze the treatment plans. Finally, we investigated the idea of mixed beam photon and electron treatment planning. Photon optimization treatment planning tools were included within the MERT planning toolkit for the purpose of mixed beam optimization. In conclusion, this thesis work has resulted in the development of an advanced framework for photon and electron Monte Carlo treatment planning studies and the development of an inverse planning system for photon, electron or mixed beam radiotherapy (MBRT). The justification and validation of this work is found within the results of the planning studies, which have demonstrated dosimetric advantages to using MERT or MBRT in comparison to clinical treatment alternatives.

  13. The emerging dental workforce: long-term career expectations and influences. A quantitative study of final year dental students' views on their long-term career from one London Dental School

    PubMed Central

    2009-01-01

    Background Research into the motivation and expectations of the emerging workforce and their short-term expectations has already been reported with a view to informing professional and policy decisions. The objective of this component of the research programme was to examine the long-term goals and perceived influences on final year dental students' professional careers. Methods Univariate analysis of a self completed questionnaire survey of all final year dental students from King's College London, comprising questions on demography, long-term career goals and influences, proposed commitment to dentistry, commitment to healthcare systems and the influences thereon. Statistical analysis included Chi Squared tests for linear association. Results Ninety per cent of students responded to this survey (n = 126), the majority of whom were aged 23 years (59%), female (58%) and Asian (70%). Long-term career goals were fairly evenly split between 'dentist with a special interest' (27%), 'primary dental care practitioner' (26%) and 'specialist' (25%), with 19% not certain. Only 60% of total respondents anticipated working full-time in the long-term (79% males cf 52% females; p = 0.00). The vast majority of respondents (≥80%) identified 'work-life balance', 'financial stability' and 'professional development' as 'important' or 'very important' influences on the number of future sessions. Females were significantly more likely to rate childcare commitments as an important influence on their future working capacity compared with males (p = 0.00). A wide range of factors were considered important or very important in making the NHS attractive, led by support for professional development (88%) and feeling valued by patients (88%), as well as funding, time with patients, rewards for prevention and practical issues such as dental materials and premises. Females were significantly more likely than males to be attracted to work within the NHS by 'childcare support' (p = 0.02), 'retraining facilities after career break' (p = 0.01), 'assistance with student debt' (p = 0.01) and 'incentives to work in deprived areas'. Conclusion Long-term career plans of new graduates from this London Dental School commonly embrace opportunities for professional development as well as personal issues such as work/life balance and financial income. Significant differences were identified between male and females long-term plans and influences. The implications of these findings are discussed. PMID:20030814

  14. The emerging dental workforce: long-term career expectations and influences. A quantitative study of final year dental students' views on their long-term career from one London Dental School.

    PubMed

    Gallagher, Jennifer E; Patel, Resmi; Wilson, Nairn H F

    2009-12-23

    Research into the motivation and expectations of the emerging workforce and their short-term expectations has already been reported with a view to informing professional and policy decisions. The objective of this component of the research programme was to examine the long-term goals and perceived influences on final year dental students' professional careers. Univariate analysis of a self completed questionnaire survey of all final year dental students from King's College London, comprising questions on demography, long-term career goals and influences, proposed commitment to dentistry, commitment to healthcare systems and the influences thereon. Statistical analysis included Chi Squared tests for linear association. Ninety per cent of students responded to this survey (n = 126), the majority of whom were aged 23 years (59%), female (58%) and Asian (70%). Long-term career goals were fairly evenly split between 'dentist with a special interest' (27%), 'primary dental care practitioner' (26%) and 'specialist' (25%), with 19% not certain. Only 60% of total respondents anticipated working full-time in the long-term (79% males cf 52% females; p = 0.00). The vast majority of respondents (> or =80%) identified 'work-life balance', 'financial stability' and 'professional development' as 'important' or 'very important' influences on the number of future sessions. Females were significantly more likely to rate childcare commitments as an important influence on their future working capacity compared with males (p = 0.00). A wide range of factors were considered important or very important in making the NHS attractive, led by support for professional development (88%) and feeling valued by patients (88%), as well as funding, time with patients, rewards for prevention and practical issues such as dental materials and premises. Females were significantly more likely than males to be attracted to work within the NHS by 'childcare support' (p = 0.02), 'retraining facilities after career break' (p = 0.01), 'assistance with student debt' (p = 0.01) and 'incentives to work in deprived areas'. Long-term career plans of new graduates from this London Dental School commonly embrace opportunities for professional development as well as personal issues such as work/life balance and financial income. Significant differences were identified between male and females long-term plans and influences. The implications of these findings are discussed.

  15. 75 FR 34669 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... Promulgation of Air Quality Implementation Plans; Maryland; Transportation Conformity Regulations AGENCY... Implementation Plan (SIP) revision submitted by Maryland for Transportation Conformity Regulations. In the Final Rules section of this Federal Register, EPA is approving the State's SIP submittal as a direct final...

  16. Effects of Individual Differences in Working Memory on Plan Presentational Choices

    PubMed Central

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory. PMID:27899905

  17. Effects of Individual Differences in Working Memory on Plan Presentational Choices.

    PubMed

    Tintarev, Nava; Masthoff, Judith

    2016-01-01

    This paper addresses research questions that are central to the area of visualization interfaces for decision support: (RQ1) whether individual user differences in working memory should be considered when choosing how to present visualizations; (RQ2) how to present the visualization to support effective decision making and processing; and (RQ3) how to evaluate the effectiveness of presentational choices. These questions are addressed in the context of presenting plans, or sequences of actions, to users. The experiments are conducted in several domains, and the findings are relevant to applications such as semi-autonomous systems in logistics. That is, scenarios that require the attention of humans who are likely to be interrupted, and require good performance but are not time critical. Following a literature review of different types of individual differences in users that have been found to affect the effectiveness of presentational choices, we consider specifically the influence of individuals' working memory (RQ1). The review also considers metrics used to evaluate presentational choices, and types of presentational choices considered. As for presentational choices (RQ2), we consider a number of variants including interactivity, aggregation, layout, and emphasis. Finally, to evaluate the effectiveness of plan presentational choices (RQ3) we adopt a layered-evaluation approach and measure performance in a dual task paradigm, involving both task interleaving and evaluation of situational awareness. This novel methodology for evaluating visualizations is employed in a series of experiments investigating presentational choices for a plan. A key finding is that emphasizing steps (by highlighting borders) can improve effectiveness on a primary task, but only when controlling for individual variation in working memory.

  18. Amendments to Summary Plan Description regulations. Pension and Welfare Benefits Administration, Labor. Final rule.

    PubMed

    2000-11-21

    This document contains a final rule amending the regulations governing the content of the Summary Plan Description (SPD) required to be furnished to employee benefit plan participants and beneficiaries under the Employee Retirement Income Security Act of 1974, as amended (ERISA). These amendments implement information disclosure recommendations of the President's Advisory Commission on Consumer Protection and Quality in the Health Care Industry, as set forth in their November 20, 1997, report, "Consumer Bill of Rights and Responsibilities." Specifically, the amendments clarify benefit, medical provider, and other information required to be disclosed in, or as part of, the SPD of a group health plan and repeal the limited exemption with respect to SPDs of welfare plans providing benefits through qualified health maintenance organizations (HMOs). In addition, this document contains several amendments updating and clarifying provisions relating to the content of SPDs that affect both pension and welfare benefit plans. This document also adopts in final form certain regulations that were effective on an interim basis implementing amendments to ERISA enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA). This final rule will affect employee pension and welfare benefit plans, including group health plans, as well as administrators, fiduciaries, participants and beneficiaries of such plans.

  19. Claims Procedure for Plans Providing Disability Benefits. Final rule.

    PubMed

    2016-12-19

    This document contains a final regulation revising the claims procedure regulations under the Employee Retirement Income Security Act of 1974 (ERISA) for employee benefit plans providing disability benefits. The final rule revises and strengthens the current rules primarily by adopting certain procedural protections and safeguards for disability benefit claims that are currently applicable to claims for group health benefits pursuant to the Affordable Care Act. This rule affects plan administrators and participants and beneficiaries of plans providing disability benefits, and others who assist in the provision of these benefits, such as third-party benefits administrators and other service providers.

  20. Progress on the Construction of the Perpendicularly Biased 2nd Harmonic Cavity for the Fermilab Booster

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Madrak, R.; Dey, J.; Duel, K.

    A perpendicularly biased tuneable 2nd harmonic cavity, designed for the Fermilab Booster, is being assembled for testing this summer (2018). The cavity will work at twice the frequency of the fundamental cavities, and will be on only during the injection and transition (or extraction) periods. The main reason for adding this cavity is to improve beam capture and reduce losses as required by Fermilab's Proton Improvement Plan (PIP). After three years optimization and study, the cavity design has now been finalized and all constituent parts have been received. We report on the cavity final design and on the status ofmore » the construction.« less

  1. Patient protection and Affordable Care Act; data collection to support standards related to essential health benefits; recognition of entities for the accreditation of qualified health plans. Final rule.

    PubMed

    2012-07-20

    This final rule establishes data collection standards necessary to implement aspects of section 1302 of the Patient Protection and Affordable Care Act (Affordable Care Act), which directs the Secretary of Health and Human Services to define essential health benefits. This final rule outlines the data on applicable plans to be collected from certain issuers to support the definition of essential health benefits. This final rule also establishes a process for the recognition of accrediting entities for purposes of certification of qualified health plans.

  2. Constraint-based integration of planning and scheduling for space-based observatory management

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven F.

    1994-01-01

    Progress toward the development of effective, practical solutions to space-based observatory scheduling problems within the HSTS scheduling framework is reported. HSTS was developed and originally applied in the context of the Hubble Space Telescope (HST) short-term observation scheduling problem. The work was motivated by the limitations of the current solution and, more generally, by the insufficiency of classical planning and scheduling approaches in this problem context. HSTS has subsequently been used to develop improved heuristic solution techniques in related scheduling domains and is currently being applied to develop a scheduling tool for the upcoming Submillimeter Wave Astronomy Satellite (SWAS) mission. The salient architectural characteristics of HSTS and their relationship to previous scheduling and AI planning research are summarized. Then, some key problem decomposition techniques underlying the integrated planning and scheduling approach to the HST problem are described; research results indicate that these techniques provide leverage in solving space-based observatory scheduling problems. Finally, more recently developed constraint-posting scheduling procedures and the current SWAS application focus are summarized.

  3. Three countries' experience with Norplant introduction.

    PubMed

    Hardee, K; Balogh, S; Villinski, M T

    1997-09-01

    Despite international efforts to plan for Norplant introduction, the method has drawn the attention of critics of family planning programmes, and has raised several issues for debate since it was introduced into family planning programmes. The experiences of three countries with the introduction of Norplant highlight some of the unique features of the method that have affected its introduction. Indonesia, Bangladesh and the United States represent diverse cultural settings and systems of family planning provision. Experience in each country has highlighted the need to focus on quality of care for clients, most notably the need for good counselling and attention to removal as well as insertion. The cost of Norplant also has influenced its introduction in each country. Another issue includes the need to work with women's health advocacy groups, which is illustrated particularly in Bangladesh. Finally, the role of litigation in the United States, and its potential role in influencing Norplant introduction in other countries, is discussed. These three countries' experience illustrate the importance of understanding the programmatic context of contraceptive introduction.

  4. SPANR planning and scheduling

    NASA Astrophysics Data System (ADS)

    Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry

    2001-07-01

    SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.

  5. 76 FR 40394 - Final Plan for Fiscal Year 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... DEPARTMENT OF JUSTICE Office of Juvenile Justice and Delinquency Prevention [OJP (OJJDP) Docket No. 1563] Final Plan for Fiscal Year 2011 AGENCY: Office of Juvenile Justice and Delinquency Prevention.... SUMMARY: The Office of Juvenile Justice and Delinquency Prevention is publishing this notice of its Final...

  6. 75 FR 72963 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... Promulgation of Air Quality Implementation Plans; Maryland; Control of Volatile Organic Compound Emissions From Industrial Solvent Cleaning Operations; Withdrawal of Direct Final Rule AGENCY: Environmental Protection... withdrawing the direct final rule to approve revisions to Maryland's State Implementation Plan (SIP). This SIP...

  7. 75 FR 27812 - Final Environmental Impact Statement for the General Management Plan; Harpers Ferry National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... guidance to park management for administration, development, and interpretation of park resources over the... General Management Plan for Harpers Ferry National Historical Park. SUMMARY: Pursuant to the National... availability of a Final Environmental Impact Statement for the General Management Plan for Harpers Ferry [[Page...

  8. 76 FR 60525 - Final Wilderness and Backcountry Management Plan and Environmental Impact Statement for Isle...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... and Environmental Impact Statement for Isle Royale National Park, MI AGENCY: National Park Service... the availability of a Final Wilderness and Backcountry Management Plan and Environmental Impact... the Internet through the NPS Planning, Environment, and Public Comment Web site ( http://parkplanning...

  9. 76 FR 77900 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  10. 76 FR 13883 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  11. 78 FR 16401 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  12. 78 FR 35754 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  13. 77 FR 56770 - Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Parts 4022 and 4044 Allocation of Assets in Single-Employer Plans; Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Valuing and Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final...

  14. Medicaid program; self-directed personal assistance services program State Plan option (cash and counseling). Final rule.

    PubMed

    2008-10-03

    This final rule provides guidance to States that want to administer self-directed personal assistance services through their State Plans, as authorized by the Deficit Reduction Act of 2005. The State plan option allows beneficiaries, through an approved self-directed services plan and budget, to purchase personal assistance services. The rule also provides guidance to ensure beneficiary health and welfare and financial accountability of the State Plan option.

  15. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow whenmore » filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.« less

  16. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  17. 75 FR 69709 - Office of New Reactors; Notice of Availability of the Final Staff Guidance; Standard Review Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... the Final Staff Guidance; Standard Review Plan, Section 13.6.6, Revision 0 on Cyber Security Plan... Reports for Nuclear Power Plants,'' Section 13.6.6, Revision 0 on ``Cyber Security Plan'' (Agencywide.... Disposition: On May 13, 2010, the NRC staff issued the proposed Revision 0 on SRP Section 13.6.6 on ``Cyber...

  18. The new final Clinical Skills examination in human medicine in Switzerland: Essential steps of exam development, implementation and evaluation, and central insights from the perspective of the national Working Group

    PubMed Central

    Berendonk, Christoph; Schirlo, Christian; Balestra, Gianmarco; Bonvin, Raphael; Feller, Sabine; Huber, Philippe; Jünger, Ernst; Monti, Matteo; Schnabel, Kai; Beyeler, Christine; Guttormsen, Sissel; Huwendiek, Sören

    2015-01-01

    Objective: Since 2011, the new national final examination in human medicine has been implemented in Switzerland, with a structured clinical-practical part in the OSCE format. From the perspective of the national Working Group, the current article describes the essential steps in the development, implementation and evaluation of the Federal Licensing Examination Clinical Skills (FLE CS) as well as the applied quality assurance measures. Finally, central insights gained from the last years are presented. Methods: Based on the principles of action research, the FLE CS is in a constant state of further development. On the foundation of systematically documented experiences from previous years, in the Working Group, unresolved questions are discussed and resulting solution approaches are substantiated (planning), implemented in the examination (implementation) and subsequently evaluated (reflection). The presented results are the product of this iterative procedure. Results: The FLE CS is created by experts from all faculties and subject areas in a multistage process. The examination is administered in German and French on a decentralised basis and consists of twelve interdisciplinary stations per candidate. As important quality assurance measures, the national Review Board (content validation) and the meetings of the standardised patient trainers (standardisation) have proven worthwhile. The statistical analyses show good measurement reliability and support the construct validity of the examination. Among the central insights of the past years, it has been established that the consistent implementation of the principles of action research contributes to the successful further development of the examination. Conclusion: The centrally coordinated, collaborative-iterative process, incorporating experts from all faculties, makes a fundamental contribution to the quality of the FLE CS. The processes and insights presented here can be useful for others planning a similar undertaking. PMID:26483853

  19. Remedial investigation work plan for Bear Creek Valley Operable Unit 1 (S-3 Ponds, Boneyard/Burnyard, Oil Landfarm, Sanitary Landfill 1, and the Burial Grounds, including Oil Retention Ponds 1 and 2) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Volume 1, Main text

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The intent and scope of the work plan are to assemble all data necessary to facilitate selection of remediation alternatives for the sites in Bear Creek Valley Operable Unit 1 (BCV OU 1) such that the risk to human health and the environment is reduced to acceptable levels based on agreements with regulators. The ultimate goal is to develop a final Record Of Decision (ROD) for all of the OUs in BCV, including the integrator OU. However, the initial aim of the source OUs is to develop a ROD for interim measures. For source OUs such as BCV OU 1,more » data acquisition will not be carried out in a single event, but will be carried out in three stages that accommodate the schedule for developing a ROD for interim measures and the final site-wide ROD. The three stages are as follows: Stage 1, Assemble sufficient data to support decisions such as the need for removal actions, whether to continue with the remedial investigation (RI) process, or whether no further action is required. If the decision is made to continue the RI/FS process, then: Stage 2, Assemble sufficient data to allow for a ROD for interim measures that reduce risks to the human health and the environment. Stage 3, Provide input from the source OU that allows a final ROD to be issued for all OUs in the BCV hydrologic regime. One goal of the RI work plan will be to ensure that sampling operations required for the initial stage are not repeated at later stages. The overall goals of this RI are to define the nature and extent of contamination so that the impact of leachate, surface water runoff, and sediment from the OU I sites on the integrator OU can be evaluated, the risk to human health and the environment can be defined, and the general physical characteristics of the subsurface can be determined such that remedial alternatives can be screened.« less

  20. Advanced planning for ISS payload ground processing

    NASA Astrophysics Data System (ADS)

    Page, Kimberly A.

    2000-01-01

    Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .

  1. 76 FR 38146 - Revision to the Final Principles of Integrated Resource Planning for Use in Resource Acquisition...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... DEPARTMENT OF ENERGY Western Area Power Administration Revision to the Final Principles of... Administration (Western) published proposed Principles for Integrated Resource planning (IRP) for use in its... December 6, 1994. After considering public comments on the proposed principles, Western adopted the Final...

  2. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm

    PubMed Central

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness. PMID:26819583

  3. A Generalized National Planning Approach for Admission Capacity in Higher Education: A Nonlinear Integer Goal Programming Model with a Novel Differential Evolution Algorithm.

    PubMed

    El-Qulity, Said Ali; Mohamed, Ali Wagdy

    2016-01-01

    This paper proposes a nonlinear integer goal programming model (NIGPM) for solving the general problem of admission capacity planning in a country as a whole. The work aims to satisfy most of the required key objectives of a country related to the enrollment problem for higher education. The system general outlines are developed along with the solution methodology for application to the time horizon in a given plan. The up-to-date data for Saudi Arabia is used as a case study and a novel evolutionary algorithm based on modified differential evolution (DE) algorithm is used to solve the complexity of the NIGPM generated for different goal priorities. The experimental results presented in this paper show their effectiveness in solving the admission capacity for higher education in terms of final solution quality and robustness.

  4. Current-Sensitive Path Planning for an Underactuated Free-Floating Ocean Sensorweb

    NASA Technical Reports Server (NTRS)

    Dahl, Kristen P.; Thompson, David R.; McLaren, David; Chao, Yi; Chien, Steve

    2011-01-01

    This work investigates multi-agent path planning in strong, dynamic currents using thousands of highly under-actuated vehicles. We address the specific task of path planning for a global network of ocean-observing floats. These submersibles are typified by the Argo global network consisting of over 3000 sensor platforms. They can control their buoyancy to float at depth for data collection or rise to the surface for satellite communications. Currently, floats drift at a constant depth regardless of the local currents. However, accurate current forecasts have become available which present the possibility of intentionally controlling floats' motion by dynamically commanding them to linger at different depths. This project explores the use of these current predictions to direct float networks to some desired final formation or position. It presents multiple algorithms for such path optimization and demonstrates their advantage over the standard approach of constant-depth drifting.

  5. MRP (materiel requirements planning) II implementation: a case study.

    PubMed

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  6. Real-time path planning and autonomous control for helicopter autorotation

    NASA Astrophysics Data System (ADS)

    Yomchinda, Thanan

    Autorotation is a descending maneuver that can be used to recover helicopters in the event of total loss of engine power; however it is an extremely difficult and complex maneuver. The objective of this work is to develop a real-time system which provides full autonomous control for autorotation landing of helicopters. The work includes the development of an autorotation path planning method and integration of the path planner with a primary flight control system. The trajectory is divided into three parts: entry, descent and flare. Three different optimization algorithms are used to generate trajectories for each of these segments. The primary flight control is designed using a linear dynamic inversion control scheme, and a path following control law is developed to track the autorotation trajectories. Details of the path planning algorithm, trajectory following control law, and autonomous autorotation system implementation are presented. The integrated system is demonstrated in real-time high fidelity simulations. Results indicate feasibility of the capability of the algorithms to operate in real-time and of the integrated systems ability to provide safe autorotation landings. Preliminary simulations of autonomous autorotation on a small UAV are presented which will lead to a final hardware demonstration of the algorithms.

  7. Satellite power systems (SPS) concept definition study. Volume 7: SPS program plan and economic analysis, appendixes

    NASA Technical Reports Server (NTRS)

    Hanley, G.

    1978-01-01

    Three appendixes in support of Volume 7 are contained in this document. The three appendixes are: (1) Satellite Power System Work Breakdown Structure Dictionary; (2) SPS cost Estimating Relationships; and (3) Financial and Operational Concept. Other volumes of the final report that provide additional detail are: Executive Summary; SPS Systems Requirements; SPS Concept Evolution; SPS Point Design Definition; Transportation and Operations Analysis; and SPS Technology Requirements and Verification.

  8. EMMA, a Recoil Mass Spectrometer for TRIUMF's ISAC-II Facility

    NASA Astrophysics Data System (ADS)

    Davids, Barry; EMMA Collaboration

    2016-09-01

    EMMA is a recoil mass spectrometer for TRIUMF's ISAC-II facility in the final stages of installation and commissioning. In this talk I will briefly review the spectrometer's design capabilities, describe recent progress in its installation and commissioning, and discuss plans for its initial experimental program. This work was supported by the Natural Sciences and Engineering Council of Canada. TRIUMF receives federal funds through a contribution agreement with the National Research Council of Canada.

  9. SPQR - Spectroscopy: Prospects, Questions & Results

    NASA Astrophysics Data System (ADS)

    Pennington, M. R.

    2014-06-01

    Tremendous progress has been made in mapping out the spectrum of hadrons over the past decade with plans to make further advances in the decade ahead. Baryons and mesons, both expected and unexpected, have been found, the results of precision experiments often with polarized beams, polarized targets and sometimes polarization of the final states. All these hadrons generate poles in the complex energy plane that are consequences of the strong coupling regime of QCD. They reveal how this works.

  10. Fort Devens Feasibility Study (FS) for Group 1A Sites, Final Data Gap Activities Work Plan

    DTIC Science & Technology

    1993-03-01

    3-6 3.1.7 Railroad Roundhouse ......................... 3-7 3.2 COLD SPRING BROOK LANDFILL BACKGROUND AND U CONDITIONS...wells SHL-3 and SHL-7) is the site of a former railroad roundhouse . This roundhouse was used between 1900 and 1935. Because of the age of the... Roundhouse 5 Environmental samples will be collected at four locations at the site of the former railroad roundhouse adjacent to Shepley’s Hill

  11. STS 62 Final Report

    NASA Technical Reports Server (NTRS)

    Rice, James E.

    1996-01-01

    The report is organized into sections representing the phases of work performed in analyzing the STS 62 results and preparing the instrument for STS 65. Section 2 contains a brief analysis of the STS 62 data which verifies the instrument changes to resolve the STS 58 problems. Section 3 describes the results from STS 62, including the original mission plan and several minor calibration period anomalies first discovered on STS 58 and reappearing to a lesser extent on STS 62.

  12. NASA Science Institutes Plan. Report of the NASA Science Institutes Team: Final Publication (Incorporating Public Comments and Revisions)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This NASA Science Institute Plan has been produced in response to direction from the NASA Administrator for the benefit of NASA Senior Management, science enterprise leaders, and Center Directors. It is intended to provide a conceptual framework for organizing and planning the conduct of science in support of NASA's mission through the creation of a limited number of science Institutes. This plan is the product of the NASA Science Institute Planning Integration Team (see Figure A). The team worked intensively over a three-month period to review proposed Institutes and produce findings for NASA senior management. The team's activities included visits to current NASA Institutes and associated Centers, as well as approximately a dozen non-NASA research Institutes. In addition to producing this plan, the team published a "Benchmarks" report. The Benchmarks report provides a basis for comparing NASA's proposed activities with those sponsored by other national science agencies, and identifies best practices to be considered in the establishment of NASA Science Institutes. Throughout the team's activities, a Board of Advisors comprised of senior NASA officials (augmented as necessary with other government employees) provided overall advice and counsel.

  13. 77 FR 39180 - Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9690-9] Withdrawal of Direct Final Rule Revising the California State Implementation Plan, South Coast Air Quality Management... State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District...

  14. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  15. Federal employees health benefits program: discontinuance of health plan in an emergency. Final regulation.

    PubMed

    2007-01-17

    The Office of Personnel Management (OPM) is issuing a final rule to amend the Federal Employees Health Benefits (FEHB) regulations regarding discontinuance of a health plan to include situations in which a health plan becomes incapacitated, either temporarily or permanently, as the result of a disaster.

  16. 77 FR 65125 - Approval and Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...

  17. Time management in radiation oncology: development and evaluation of a modular system based on the example of rectal cancer treatment. The DEGRO-QUIRO trial.

    PubMed

    Fietkau, R; Budach, W; Zamboglou, N; Thiel, H-J; Sack, H; Popp, W

    2012-01-01

    The goal was to develop and evaluate a modular system for measurement of the work times required by the various professional groups involved in radiation oncology before, during, and after serial radiation treatment (long-term irradiation with 25-28 fractions of 1.8 Gy) based on the example of rectal cancer treatment. A panel of experts divided the work associated with providing radiation oncology treatment into modules (from the preparation of radiotherapy, RT planning and administration to the final examination and follow-up). The time required for completion of each module was measured by independent observers at four centers (Rostock, Bamberg, Düsseldorf, and Offenbach, Germany). A total of 1,769 data sets were collected from 63 patients with 10-489 data sets per module. Some modules (informed consent procedure, routine treatments, CT planning) exhibited little deviation between centers, whereas others (especially medical and physical irradiation planning) exhibited a wide range of variation (e.g., 1 h 49 min to 6 h 56 min for physical irradiation planning). The mean work time per patient was 12 h 11 min for technicians, 2 h 59 min for physicists, and 7 h 6 min for physicians. The modular system of time measurement proved to be reliable and produced comparable data at the different centers. Therefore, the German Society of Radiation Oncology (DEGRO) decided that it can be extended to other types of cancer (head and neck, prostate, and breast cancer) with appropriate modifications.

  18. SU-E-T-182: Feasibility of Dose Painting by Numbers in Proton Therapy with Contour-Driven Plan Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montero, A Barragan; Differding, S; Lee, J

    Purpose: The work aims to 1) prove the feasibility of dose painting by numbers (DPBN) in proton therapy with usual contour-driven plan optimization and 2) compare the achieved plan quality to that of rotational IMRT. Methods: For two patients with head and neck cancers, voxel-by-voxel prescription to the target volume (PTV-PET) was calculated from {sup 18} FDG-PET images and converted to contour-based prescription by defining several sub-contours. Treatments were planned with RayStation (RaySearch Laboratories, Sweden) and proton pencil beam scanning modality. In order to determine the optimal plan parameters to approach the DPBN prescription, the effect of the number ofmore » fields, number of sub-contours and use of range shifter were tested separately on each patient. The number of sub-contours were increased from 3 to 11 while the number of fields were set to 3, 5, 7 and 9. Treatment plans were also optimized on two rotational IMRT systems (TomoTherapy and Varian RapidArc) using previously published guidelines. Results: For both patients, more than 99% of the PTV-PET received at least 95% of the prescribed dose while less than 1% of the PTV-PET received more than 105%, which demonstrates the feasibility of the treatment. Neither the use of a range shifter nor the increase of the number of fields had a significant influence on PTV coverage. Plan quality increased when increasing number of fields up to 7 or 9 and slightly decreased for a bigger number of sub-contours. Good OAR sparing is achieved while keeping high plan quality. Finally, proton therapy achieved significantly better plan quality than rotational IMRT. Conclusion: Voxel-by-voxel prescriptions can be approximated accurately in proton therapy using a contour-driven optimization. Target coverage is nearly insensitive to the number of fields and the use of a range shifter. Finally, plan quality assessment confirmed the superiority of proton therapy compared to rotational IMRT.« less

  19. 77 FR 28785 - Revisions to Federal Implementation Plans To Reduce Interstate Transport of Fine Particulate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Ozone AGENCY: Environmental Protection Agency (EPA). ACTION: Withdrawal of direct final rule. SUMMARY... Particulate Matter and Ozone'' as a direct final rule on February 21, 2012. Because the EPA received adverse... Implementation Plans To Reduce Interstate Transport of Fine Particulate Matter and Ozone'' as a direct final rule...

  20. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    NASA Astrophysics Data System (ADS)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning infrastructure, processes and automation in order to support science planning of this scale throughout the TGO mission. We also detail how the re-use and further development of ESA's multi-mission planning software tool is being implemented in order to provide the necessary additional functionality for the SOC's planning team to exploit, and to therefore ensure the optimum scientific return of the TGO mission. Finally, we provide an overview and status of the real science planning activities taking place in the first weeks of the nominal science phase in the first half of 2018.

  1. Analysis of post-mining excavations as places for municipal waste

    NASA Astrophysics Data System (ADS)

    Górniak-Zimroz, Justyna

    2018-01-01

    Waste management planning is an interdisciplinary task covering a wide range of issues including costs, legal requirements, spatial planning, environmental protection, geography, demographics, and techniques used in collecting, transporting, processing and disposing of waste. Designing and analyzing this issue is difficult and requires the use of advanced analysis methods and tools available in GIS geographic information systems containing readily available graphical and descriptive databases, data analysis tools providing expert decision support while selecting the best-designed alternative, and simulation models that allow the user to simulate many variants of waste management together with graphical visualization of the results of performed analyzes. As part of the research study, there have been works undertaken concerning the use of multi-criteria data analysis in waste management in areas located in southwestern Poland. These works have proposed the inclusion in waste management of post-mining excavations as places for the final or temporary collection of waste assessed in terms of their suitability with the tools available in GIS systems.

  2. Mapping and navigating mammalian conservation: from analysis to action

    PubMed Central

    Redford, Kent H.; Ray, Justina C.; Boitani, Luigi

    2011-01-01

    Although mammals are often seen as important objects of human interest and affection, many are threatened with extinction. A range of efforts have been proposed and much work has been done to try to conserve mammals, but there is little overall understanding of what has worked and why. As a result, there is no global-scale, coordinated approach to conserving all mammals. Rather, conservation efforts are usually focused at jurisdictional levels where relevant legislation and policies are in force. To help build the framework for a global-scale approach, in this paper we review the many ways that have been proposed for conserving mammals. First, we examine the overall pattern of threat faced by mammals at the global level. Secondly, we look at the major structuring issues in prioritizing and planning mammal conservation, examining in particular the roles of values and scale and a set of approaches to conservation, each of which varies along a continuum. Finally, we lay out the steps necessary to move from planning to implementing mammalian conservation. PMID:21844050

  3. Supersonics--Airport Noise

    NASA Technical Reports Server (NTRS)

    Bridges, James

    2007-01-01

    At this, the first year-end meeting of the Fundamental Aeronautics Program, an overview of the Airport Noise discipline of the Supersonics Project leads the presentation of technical plans and achievements in this area of the Project. The overview starts by defining the Technical Challenges targeted by Airport Noise efforts, and the Approaches planned to meet these challenges. These are fleshed out in Elements, namely Prediction, Diagnostics, and Engineering, and broken down into Tasks. The Tasks level is where individual researchers' work is defined and from whence the technical presentations to follow this presentation come. This overview also presents the Milestones accomplished to date and to be completed in the next year. Finally, the NASA Research Announcement cooperative agreement activities are covered and tied to the Tasks and Milestones.

  4. [Activities of Colorado University

    NASA Technical Reports Server (NTRS)

    Snow, Theodore P.; Bierbaum, Veronica

    2003-01-01

    During the report period we completed several studies and embarked on a new set of laboratory experiments. We also hired a new post-doctoral Research Associate, Momir Stepanovic, who has gradually assumed leadership in the laboratory work. The other person involved has been graduate student Brian Eichelberger, who will complete his Ph.D. based on this work by late spring of this year. We have also continued to collaborate with our previous postdoctoral Research Associate, Valery Le Page, through a consulting arrangement. In the following sections we summarize work that has been completed and either in print, in press, or in final stages of preparation for publication; current work being carried out in the laboratory; and plans for the coming year. Work completed in 2002: 1. Modeling the physical and chemical states of PAHs in the diffuse interstellar medium. 2. Hydrogenation and charge states of polycyclic aromatic hydrocarbons in diffuse clouds. 3. Laboratory studies of chemical reactions involving carbon chain anions.

  5. Individual features, working conditions and work injuries are associated with work ability among nursing professionals.

    PubMed

    Fischer, Frida Marina; Martinez, Maria Carmen

    2013-01-01

    To investigate factors associated with work ability among nursing professionals. They comprised 514 nursing professionals (83.8% of the total number of workers) from a hospital in São Paulo, Brazil. In 2009, we conducted a cross-sectional study that was a part of a 5-year planned cohort study initiated in 2008. We administered a comprehensive questionnaire to the participants in order to obtain data on their sociodemographic characteristics, lifestyles, and working conditions. The questionnaire also contained the Brazilian versions of the following: the Job Stress Scale (JSS), Effort-Reward Imbalance (ERI) Questionnaire, Work-Related Activities That May Contribute To Job-Related Pain and/or Injury (WRAPI), and Work Ability Index (WAI). The results were analyzed using descriptive, bivariate, and multivariate linear regression analyses. On the WAI, 74.9% of the workers obtained a score of over 40 points (score range 7-49); the mean score was 42.3 points (SD=4.5). The final multivariate model showed that lower WAI scores were related to the work-related outcome, which was work injury, and the following individual characteristics and working conditions: body mass index (p=0.001), sex (female; p=0.002), sedentariness (p < 0.001), time in the profession (p=0.005), social support at work (p=0.003), effort-reward ratio (p=0.001), violence at work (p=0.005), WRAPI score (p < 0.001), and work injuries (yes; p=0.001). Various factors were associated with work ability. The results showed that a number of variables should be considered when planning and implementing actions to maintain or improve work ability among nursing professionals.

  6. Enhancing In-Flight Transoceanic Communications Using Swift-64 Packet Mode Service

    NASA Technical Reports Server (NTRS)

    Slywczak, Richard A.

    2004-01-01

    Current aeronautical communications can be divided into two segments. The first provides state of the art, packet switched technology to the cabin passengers so that they have access to e-mail and web services. The second provides basic circuit switch communication technology to the cockpit, which does not use bandwidth as efficiently as packet switching nor promotes resource sharing. This paper explores the research efforts currently being conducted by the NASA/Glenn Research Center (GRC) for transoceanic communications. The goal is to bring packet mode services to both the cabin and the cockpit of the aircraft and be able to attain benefits by sharing the data link with cabin services. First, this paper will outline the goals of the program and detail the benefits and issues related to this research. We will explain our current laboratory setup and show an architecture implemented in the testbed. Finally, we will present a work plan that will show the progression of research over the next year. This plan will describe a complete cycle from conceptual design and laboratory implementation to the final flight testing.

  7. TRU Waste Management Program. Cost/schedule optimization analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less

  8. 77 FR 34402 - Notice of Availability of the Final Land Use Analysis and Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... mining would occur directly beneath the lake itself and no surface mining would take place. East Lynn... Rockspring have approved mining and reclamation plans from the West Virginia Department of Environmental... plan purposes if leases were to be issued and mine plans approved. The Office of Surface Mining...

  9. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  10. 75 FR 36064 - Stellwagen Bank National Marine Sanctuary Final Revised Management Plan: Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-24

    ... on the Web site: http://stellwagen.noaa.gov . For a hard copy or data CD of the plan contact the sanctuary office at the contact number identified below. DATES: The final revised management plan is available to the public on June 17, 2010. FOR FURTHER INFORMATION CONTACT: Anne Smrcina, Stellwagen Bank...

  11. 75 FR 18113 - Magnuson-Stevens Act Provisions; Fisheries of the Northeastern United States; Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... final operations plan, contract, and environmental assessment (EA), and the Final Regulatory Flexibility... fish in a given FY, it must submit an operations plan, sector contract, and EA to NMFS by September 1... National Environmental Policy Act (NEPA), an EA was prepared for each operations plan. All sector EAs are...

  12. [Situational profile and intervention strategy in the Mesoamerican region in maternal, neonatal and reproductive health area].

    PubMed

    Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María del Carmen; Iriarte, Emma; Danel, Isabella; Donnay, France; Alemán, Denis; Serrano, Roselyn; Morales, Evelyn; Largaespada, Natalia; González, José Douglas Jarquín; Hernández, Ma Del Carmen; Mejía, Claudia E Quiroz; González, Geneva; Carrera, Yadira; Valverde, Clelia; Luna, Rufino; Valencia-Mendoza, Atanacio; Sosa-Rubí, Sandra G; Hernández-Prado, Bernardo; Kestler, Edgar; Díaz, Juan; Walker, Dilys; Langer, Ana; Lewis, Sarah; De la Vara-Salazar, Elvia; Melo-Zurita, María Del Carmen

    2011-01-01

    To present the main results of the regional situation diagnosis and intervention plan developed in 2010 as part of the planning activities of the Mesoamerican Health System by the Working Group on Maternal, Reproductive and Neonatal Health. A group of experts and representatives from countries in the region (Central America and nine southern Mexican states) conducted an exhaustive review of available data to construct a situational analysis and a review of effective practices for improving maternal, reproductive and neonatal health. Finally, the group proposed a regional action plan, defining regional goals and specific interventions. The situational diagnosis suggests that, although there has been progress in the last 10 years, maternal and neonatal mortality rates are still unnaceptably high in the region, with a substantial variability across countries. The group proposed as a regional goal the reduction of maternal and neonatal mortality in accordance with the Millenium Development Goals. The regional plan recommends specific maternal and neonatal health interventions emphasizing obstetric and neonatal emergency care, skilled birth attendance and family planning. The plan also includes a five year implementation strategy, along with training and evaluation strategies. The regional plan for maternal, neonatal and reproductive health has the potential to be successful, provided it is effectively implemented.

  13. A 'learning-by-doing' treatment planning tutorial for medical physicists.

    PubMed

    Meyer, J; Hartmann, B; Kalet, I

    2009-06-01

    A framework for a tutorial for treatment planning in radiation oncology physics was developed, based on the University of Washington treatment planning system Prism. The tutorial is aimed at students in Medical Physics to accompany the lectures on treatment planning to enhance their theoretical knowledge. A web-based layout was chosen to allow independent work of the students. The tutorial guides the students through three different learning modules, designed mainly to enhance their understanding of the processes involved in treatment planning but also to learn the specific features of a modern treatment planning system. Each of the modules contains four units, with the aim to introduce the relevant Prism features, practice skills in different tasks and finally check the learning outcomes with a challenge and a self-scoring quiz. A survey for students' feedback completes the tutorial. Various tools and learning methods help to create an interactive, appealing learning environment, in which the emphasis is shifted from teacher-centred to student-centred learning paradigms. In summary, Prism lends itself well for educational purposes. The tutorial covers all main aspects of treatment planning. In its current form the tutorial is self-contained but still adjustable and expandable. The tutorial can be made available upon request to the authors.

  14. Group health plans and health insurance issuers relating to coverage of preventive services under the Patient Protection and Affordable Care Act. Final rules.

    PubMed

    2012-02-15

    These regulations finalize, without change, interim final regulations authorizing the exemption of group health plans and group health insurance coverage sponsored by certain religious employers from having to cover certain preventive health services under provisions of the Patient Protection and Affordable Care Act.

  15. 77 FR 24980 - Final General Management Plan and Environmental Impact Statement for the South Unit of Badlands...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-26

    ... the availability of the Final General Management Plan and Environmental Impact Statement (GMP/EIS) for the South Unit of Badlands National Park, South Dakota. DATES: The Final GMP/EIS will remain available... Register by the Environmental Protection Agency. ADDRESSES: Copies of the GMP/EIS are available by request...

  16. Final report for 105-N Basin sediment disposition task, phase 2 -- samples BOMPC8 and BOMPC9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Esch, R.A.

    1998-02-05

    This document is the final report deliverable for Phase 2 analytical work for the 105-N Basin Sediment Disposition Task. On December 23, 1997, ten samples were received at the 222-S Laboratory as follows: two (2) bottles of potable water, six (6) samples for process control testing and two (2) samples for characterization. Analyses were performed in accordance with the Letter of Instruction for Phase 2 Analytical Work for the 105-N Basin Sediment Disposition Task (Logan and Kessner, 1997) (Attachment 7) and 105-N Basin Sediment Disposition Phase-Two Sampling and Analysis Plan (SAP) (Smith, 1997). The analytical results are included in Tablemore » 1. This document provides the values of X/Qs for the onsite and offsite receptors, taking into account the building wake and the atmospheric stability effects. X/Qs values for the potential fire accident were also calculated. In addition, the unit dose were calculated for the mixtures of isotopes.« less

  17. Cueing Metacognition to Improve Researching and Essay Writing in a Final Year High School Biology Class

    NASA Astrophysics Data System (ADS)

    Conner, L. N.

    2007-03-01

    This paper reports on degrees of awareness and use of specific metacognitive strategies by 16 students in a final-year high school biology class in New Zealand. The aims of the intervention were to broaden students' thinking about bioethical issues associated with cancer and to enhance students' use of metacognition. Cues and prompts were used in this unit of work to help students use metacognitive strategies since students did not generally use metacognitive strategies spontaneously. Scaffolding was mediated through the teacher modelling, questioning, cueing or prompting students to evaluate their learning. The research reported here illustrates how teachers can cue students to be more self-directed in their learning. Three case studies illustrate how learning strategies were used differentially. Most students were aware of strategies that could help them to learn more effectively. It was found that those students who were not only aware of but also used strategies to plan, monitor and evaluate their work, produced essays of higher quality.

  18. Climate Change and Aquatic Invasive Species (Final Report) ...

    EPA Pesticide Factsheets

    EPA announced the availability of the final report, Climate Change and Aquatic Invasive Species. This report reviews available literature on climate-change effects on aquatic invasive species (AIS) and examines state-level AIS management activities. Data on management activities came from publicly available information, was analyzed with respect to climate-change effects, and was reviewed by managers. This report also analyzes state and regional AIS management plans to determine their capacity to incorporate information on changing conditions generally, and climate change specifically. The report is intended for managers and scientists working with AIS to provide them with information on the potential effects of climate change on AIS, strategies for adapting their management to accomodate these environmental changes, and highlight further research needs and gaps.

  19. Final Report for the Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period, N+3 Supersonic Program

    NASA Technical Reports Server (NTRS)

    Morgenstern, John; Norstrud, Nicole; Stelmack, Marc; Skoch, Craig

    2010-01-01

    The N+3 Final Report documents the work and progress made by Lockheed Martin Aeronautics in response to the NASA sponsored program "N+3 NRA Advanced Concept Studies for Supersonic Commercial Transports Entering Service in the 2030 to 2035 Period." The key technical objective of this effort was to generate promising supersonic concepts for the 2030 to 2035 timeframe and to develop plans for maturing the technologies required to make those concepts a reality. The N+3 program is aligned with NASA's Supersonic Project and is focused on providing alternative system-level solutions capable of overcoming the efficiency, environmental, and performance barriers to practical supersonic flight

  20. Building an LO source at 1036 GHz for a receiver

    NASA Technical Reports Server (NTRS)

    Erickson, Neal R.

    1995-01-01

    The goal of the UMass work on this grant was to build an LO source at 1036 GHz for a receiver which was to be built at JPL. The 1 THz source will consist of a high power Gunn oscillator at 86 GHz followed by a cascaded pair of planar diode doublers and finally a whisker contacted tripler. All multipliers will use single mode waveguide mounts. This use of single mode waveguide even for the final mount is a departure from the original plan, and reflects the progress that has been made in fabricating small structures. The advantages to the use of waveguide over a quasi-optical approach are that the complete system is much more compact, and much easier to use.

  1. Results from CrIS/ATMS Obtained Using an "AIRS Version-6 Like" Retrieval Algorithm

    NASA Technical Reports Server (NTRS)

    Susskind, Joel; Kouvaris, Louis; Iredell, Lena; Blaisdell, John

    2015-01-01

    AIRS and CrIS Version-6.22 O3(p) and q(p) products are both superior to those of AIRS Version-6.Monthly mean August 2014 Version-6.22 AIRS and CrIS products agree reasonably well with OMPS, CERES, and witheach other. JPL plans to process AIRS and CrIS for many months and compare interannual differences. Updates to thecalibration of both CrIS and ATMS are still being finalized. We are also working with JPL to develop a joint AIRS/CrISlevel-1 to level-3 processing system using a still to be finalized Version-7 retrieval algorithm. The NASA Goddard DISCwill eventually use this system to reprocess all AIRS and recalibrated CrIS/ATMS. .

  2. KSC-2010-4326

    NASA Image and Video Library

    2010-08-10

    CAPE CANAVERAL, Fla. -- In Orbiter Processing Facility-2 at NASA's Kennedy Space Center in Florida, thermal protection system technicians work on replacing some of space shuttle Endeavour's heat shield tiles. As the final planned mission of the Space Shuttle Program, Endeavour and its crew will deliver the Alpha Magnetic Spectrometer, as well as critical spare components to the station on the STS-134 mission targeted for launch Feb. 26, 2011. For more information visit, http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts134/index.html. Photo credit: NASA/Frankie Martin

  3. Advanced exterior sensor project : final report, September 2004.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  4. Preliminary Assessment/Site Inspection Work Plan for Granite Mountain Radio Relay System

    DTIC Science & Technology

    1994-09-01

    represent field conditions, and (3) sampling results are repeatable. Final (04 WV---,,1-, ,W•, S 2, mbr . 19W4 13 RyCWed 1.5.2 Sample Handling Sample...procedures specified in Section 2.1.3. Samples collected from shallow depths will be obtained by submerging a stainless- steel, Teflon, or glass... submerged in a manner that minimizes agitation of sediment and the water sample. If a seep or spring has minimal discharge flow, gravel, boulders, and soil

  5. Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

    NASA Technical Reports Server (NTRS)

    Van Cise, E. A.; Kelly, B. J.; Radigan, J. P.; Cranmer, C. W.

    2016-01-01

    The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture to where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publicatoin5, in 2006 development was started to baseline Extra- Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

  6. Experiences with Extra-Vehicular Activities in Response to Critical ISS Contingencies

    NASA Technical Reports Server (NTRS)

    Van Cise, E. A.; Kelly, B. J.; Radigan, J. P.; Cranmer, C. W.

    2016-01-01

    The maturation of the International Space Station (ISS) design from the proposed Space Station Freedom to today's current implementation resulted in external hardware redundancy vulnerabilities in the final design. Failure to compensate for or respond to these vulnerabilities could put the ISS in a posture where it could no longer function as a habitable space station. In the first years of ISS assembly, these responses were to largely be addressed by the continued resupply and Extra-Vehicular Activity (EVA) capabilities of the Space Shuttle. Even prior to the decision to retire the Space Shuttle, it was realized that ISS needed to have its own capability to be able to rapidly repair or replace external hardware without needing to wait for the next cargo resupply mission. As documented in a previous publication, in 2006 development was started to baseline Extra-Vehicular Activity (EVA, or spacewalk) procedures to replace hardware components whose failure would expose some of the ISS vulnerabilities should a second failure occur. This development work laid the groundwork for the onboard crews and the ground operations and engineering teams to be ready to replace any of this failed hardware. In 2010, this development work was put to the test when one of these pieces of hardware failed. This paper will provide a brief summary of the planning and processes established in the original Contingency EVA development phase. It will then review how those plans and processes were implemented in 2010, highlighting what went well as well as where there were deficiencies between theory and reality. This paper will show that the original approach and analyses, though sound, were not as thorough as they should have been in the realm of planning for next worse failures, for documenting Programmatic approval of key assumptions, and not pursuing sufficient engineering analysis prior to the failure of the hardware. The paper will further highlight the changes made to the Contingency EVA preparation team structure, approach, goals, and the resources allocated to its work after the 2010 events. Finally, the authors will overview the implementation of these updates in addressing failures onboard the ISS in 2012, 2013, and 2014. The successful use of the updated approaches, and the application of the approaches to other spacewalks, will demonstrate the effectiveness of this additional work and make a case for putting significant time and resources into pre-failure planning and analysis for critical hardware items on human-tended spacecraft.

  7. SU-F-J-105: Towards a Novel Treatment Planning Pipeline Delivering Pareto- Optimal Plans While Enabling Inter- and Intrafraction Plan Adaptation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kontaxis, C; Bol, G; Lagendijk, J

    2016-06-15

    Purpose: To develop a new IMRT treatment planning methodology suitable for the new generation of MR-linear accelerator machines. The pipeline is able to deliver Pareto-optimal plans and can be utilized for conventional treatments as well as for inter- and intrafraction plan adaptation based on real-time MR-data. Methods: A Pareto-optimal plan is generated using the automated multicriterial optimization approach Erasmus-iCycle. The resulting dose distribution is used as input to the second part of the pipeline, an iterative process which generates deliverable segments that target the latest anatomical state and gradually converges to the prescribed dose. This process continues until a certainmore » percentage of the dose has been delivered. Under a conventional treatment, a Segment Weight Optimization (SWO) is then performed to ensure convergence to the prescribed dose. In the case of inter- and intrafraction adaptation, post-processing steps like SWO cannot be employed due to the changing anatomy. This is instead addressed by transferring the missing/excess dose to the input of the subsequent fraction. In this work, the resulting plans were delivered on a Delta4 phantom as a final Quality Assurance test. Results: A conventional static SWO IMRT plan was generated for two prostate cases. The sequencer faithfully reproduced the input dose for all volumes of interest. For the two cases the mean relative dose difference of the PTV between the ideal input and sequenced dose was 0.1% and −0.02% respectively. Both plans were delivered on a Delta4 phantom and passed the clinical Quality Assurance procedures by achieving 100% pass rate at a 3%/3mm gamma analysis. Conclusion: We have developed a new sequencing methodology capable of online plan adaptation. In this work, we extended the pipeline to support Pareto-optimal input and clinically validated that it can accurately achieve these ideal distributions, while its flexible design enables inter- and intrafraction plan adaptation. This research is financially supported by Elekta AB, Stockholm, Sweden.« less

  8. 76 FR 27086 - Final General Management Plan, Wilderness Management Plan, and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... transportation opportunities would be sought to encourage visitors to come to Sand, Basswood, and Oak islands... light stations would be restored or rehabilitated, similar to the Raspberry Island light station. The...

  9. Final Rule: Community Right-To-Know Reporting Requirements Federal Register Notice

    EPA Pesticide Factsheets

    Final reporting thresholds and threshold planning quantity (TPQ) for extremely hazardous substances (EHS) and non-EHS hazardous chemicals, required under Emergency Planning and Community Right-to-Know Act, Superfund Amendments and Reauthorization Act.

  10. Developing Benchmarks for Solar Radio Bursts

    NASA Astrophysics Data System (ADS)

    Biesecker, D. A.; White, S. M.; Gopalswamy, N.; Black, C.; Domm, P.; Love, J. J.; Pierson, J.

    2016-12-01

    Solar radio bursts can interfere with radar, communication, and tracking signals. In severe cases, radio bursts can inhibit the successful use of radio communications and disrupt a wide range of systems that are reliant on Position, Navigation, and Timing services on timescales ranging from minutes to hours across wide areas on the dayside of Earth. The White House's Space Weather Action Plan has asked for solar radio burst intensity benchmarks for an event occurrence frequency of 1 in 100 years and also a theoretical maximum intensity benchmark. The solar radio benchmark team was also asked to define the wavelength/frequency bands of interest. The benchmark team developed preliminary (phase 1) benchmarks for the VHF (30-300 MHz), UHF (300-3000 MHz), GPS (1176-1602 MHz), F10.7 (2800 MHz), and Microwave (4000-20000) bands. The preliminary benchmarks were derived based on previously published work. Limitations in the published work will be addressed in phase 2 of the benchmark process. In addition, deriving theoretical maxima requires additional work, where it is even possible to, in order to meet the Action Plan objectives. In this presentation, we will present the phase 1 benchmarks and the basis used to derive them. We will also present the work that needs to be done in order to complete the final, or phase 2 benchmarks.

  11. Putting more ‘modern’ in modern physics education: a Knowledge Building approach using student questions and ideas about the universe

    NASA Astrophysics Data System (ADS)

    Wagner, Glenn

    2017-03-01

    Student-generated questions and ideas about our universe are the start of a rich and highly motivating learning environment. Using their curiosity-driven questions and ideas, students form Knowledge Building groups or ‘communities’ where they plan, set goals, design questions for research, and assess the progress of their work, tasks that were once under the control of the teacher. With the understanding that all knowledge and ideas are treated as improvable, students work collaboratively at their level of competency to share their knowledge, ideas and understandings gained from authoritative sources and laboratory activities. Over time, students work collectively to improve the knowledge and ideas of others that result in advances in understanding that benefit not only the individual but the community as a whole. Learning outcomes reported in this paper demonstrate that a Knowledge Building environment applied to introductory cosmology produced similar gains in knowledge and understanding surrounding foundational concepts compared to teacher-centred learning environments. Aside from new knowledge and understanding, students develop important skills and competencies such as question-asking, idea development, communication, collaboration that are becoming ever more important for 21st century living and working. Finally, the process of planning and initiating a Knowledge Building environment that produced the results reported in this paper is outlined.

  12. [Final Resolutions Adopted by the Conference on Planning of Rural Areas in Europe, 7 October 1978].

    ERIC Educational Resources Information Center

    Council of Europe, Strasbourg (France).

    Two final resolutions were adopted by the Council of Europe at the October 1978 European Conference of Ministers Responsible for Regional Planning. Resolution 1 focused on guidelines for the planning of rural areas in Europe. Strategies and policies called for: a more balanced development which makes the living conditions of different regions as…

  13. 40 CFR 62.14535 - When must I comply with this subpart if I plan to continue operation of my CISWI unit?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule...) You must submit a waste management plan no later than April 5, 2004. (3) You must achieve final... complete retrofit construction of control devices, as specified in the final control plan, so that, if the...

  14. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Yuen, Joseph H. (Editor)

    1994-01-01

    This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC). The TDA Office also performs work funded by other NASA program offices through and with the cooperation of OSC. Finally, tasks funded under the JPL Director's Discretionary Fund and the Caltech President's Fund that involve the TDA Office are included.

  15. Utilizing program evaluation as a strategy to promote community change: evaluation of a comprehensive, community-based, family violence initiative.

    PubMed

    Kaufman, Joy S; Crusto, Cindy A; Quan, Michael; Ross, Ellen; Friedman, Stacey R; O'Rielly, Kim; Call, Stephanie

    2006-12-01

    This paper describes the authors' work in a community that received Federal funding for an integrated system of care to reduce the impact and incidence of exposure to violence for children less than six years of age. The paper includes a review of the conceptual framework that guided the work of the authors and provides a brief overview of the issue of family violence, the impact of this violence on young children, and the Federal response to this issue. In addition, a description of the Initiative and the community in which it was based is provided along with some aspects of the evaluation plan. Finally, the authors discuss how their work with this Initiative depicts an approach to facilitating change within communities.

  16. Medicaid program; correction and reduction plans for intermediate care facilities for the mentally retarded--HCFA. Final rule.

    PubMed

    1991-07-05

    This final rule amends the portions of the Medicaid regulations under which an intermediate care facility for the mentally retarded (ICF/MR) with substantial deficiencies that did not pose an immediate jeopardy to the health and safety of clients could continue participation in the Medicaid program. These regulations gave State Medicaid agencies the option of submitting written plans to either correct deficiencies or permanently reduce the number of beds in the certified portion of the facility. This rule removes all requirements for submitting, approving, and monitoring correction plans for ICFs/MR. The requirements for submitting and approving correction plans are being removed because the time limit for submission of these plans has passed. The provisions for monitoring correction plans are being removed because there are no remaining facilities for which these provisions apply. This final rule also removes requirements for submitting and approving reduction plans for ICFs/MR because the time limit for submitting these plans has passed. It retains and updates the requirements for monitoring and compliance that apply to those ICFs/MR for which reduction plans were approved by January 1, 1990.

  17. WastePlan model implementation for New York State. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Visalli, J.R.; Blackman, D.A.

    1995-07-01

    WastePlan is a computer software tool that models solid waste quantities, costs, and other parameters on a regional basis. The software was developed by the Tellus Institute, a nonprofit research and consulting firm. The project`s objective was to provide local solid waste management planners in New York State responsible to develop and implement comprehensive solid waste management plans authorized by the Solid Waste Management Act of 1988, with a WastePlan model specifically tailored to fit the demographic and other characteristics of New York State and to provide training and technical support to the users. Two-day workshops were held in 1992more » to introduce planners to the existing versions; subsequently, extensive changes were made to the model and a second set of two-day workshops were held in 1993 to introduce planners to the enhanced version of WastePlan. Following user evaluations, WastePlan was further modified to allow users to model systems using a simplified version, and to incorporate report forms required by New York State. A post-project survey of trainees revealed limited regular use of software. Possible reasons include lack of synchronicity with NYSDEC planning process; lack of computer literacy and aptitude among trainees; hardware limitations; software user-friendliness; and the work environment of the trainees. A number of recommendations are made to encourage use of WastePlan by local solid waste management planners.« less

  18. Career Plans of Final-Year South African Student Teachers: Migration to "Greener Pastures"?

    ERIC Educational Resources Information Center

    de Villiers, J. J. R.

    2017-01-01

    Teacher loss due to migration is a global phenomenon that impacts both developed and developing nations the world over. The aim of this study was to find out about the career plans of final-year South African student teachers. A group of final-year Bachelor of Education student teachers from a South African university responded to a questionnaire…

  19. Early Origins of Child Obesity: Bridging Disciplines and Phases of Development - September 30–October 1, 2010

    PubMed Central

    Christoffel, Katherine Kaufer; Wang, Xiaobin; Binns, Helen J.

    2012-01-01

    This report summarizes a conference: “Early Origins of Child Obesity: Bridging Disciplines and Phases of Development”, held in Chicago on September 30–October 1, 2010. The conference was funded in part by the National Institutes of Health and the Williams Heart Foundation, to achieve the conference objective: forging a next-step research agenda related to the early origins of childhood obesity. This research agenda was to include working with an array of factors (from genetic determinants to societal ones) along a continuum from prenatal life to age 7, with an emphasis on how the developing child deals with the challenges presented by his/her environment (prenatal, parental, nutritional, etc.). The conference offered a unique opportunity to facilitate communication and planning of future work among a variety of researchers whose work separately addresses different periods in early life. Over the span of two days, speakers addressed existing, critical research topics within each of the most-studied age ranges. On the final day, workshops fostered the discussion needed to identify the highest priority research topics related to linking varied early factor domains. These are presented for use in planning future research and research funding. PMID:23443002

  20. Motion Planning in a Society of Intelligent Mobile Agents

    NASA Technical Reports Server (NTRS)

    Esterline, Albert C.; Shafto, Michael (Technical Monitor)

    2002-01-01

    The majority of the work on this grant involved formal modeling of human-computer integration. We conceptualize computer resources as a multiagent system so that these resources and human collaborators may be modeled uniformly. In previous work we had used modal for this uniform modeling, and we had developed a process-algebraic agent abstraction. In this work, we applied this abstraction (using CSP) in uniformly modeling agents and users, which allowed us to use tools for investigating CSP models. This work revealed the power of, process-algebraic handshakes in modeling face-to-face conversation. We also investigated specifications of human-computer systems in the style of algebraic specification. This involved specifying the common knowledge required for coordination and process-algebraic patterns of communication actions intended to establish the common knowledge. We investigated the conditions for agents endowed with perception to gain common knowledge and implemented a prototype neural-network system that allows agents to detect when such conditions hold. The literature on multiagent systems conceptualizes communication actions as speech acts. We implemented a prototype system that infers the deontic effects (obligations, permissions, prohibitions) of speech acts and detects violations of these effects. A prototype distributed system was developed that allows users to collaborate in moving proxy agents; it was designed to exploit handshakes and common knowledge Finally. in work carried over from a previous NASA ARC grant, about fifteen undergraduates developed and presented projects on multiagent motion planning.

  1. Final Approval of Arizona Air Plan Revision; Stationary Sources; New Source Review; Ammonia

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning issuance of New Source Review (NSR) permits for stationary sources related to ammonia.

  2. 78 FR 760 - Notice of Availability of the Final General Management Plan/Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... document is available on the internet at the NPS Planning, Environment, and Public Comment Web site at http.../EIS assesses impacts to soil resources, water quality, soundscapes, vegetation and wildlife...

  3. Crossing the barrier between the laboratory working model and the practicable production model

    NASA Astrophysics Data System (ADS)

    Curby, William A.

    1992-12-01

    Transforming apparatus that has developed into a successfully working laboratory system into a system that is ready, or nearly ready for production, distribution and general use is not always accomplished in a cost effective or timely fashion. Several design elements must be considered interactively during the planning, construction, use and servicing of the final production form of the system. The basic design elements are: Operating Specifications, Reliability Factors, Safety Factors, Precision Limits, Accuracy Limits, Uniformity Factors, Cost Limits and Calibration Requirements. Secondary elements including: Human Engineering, Documentation, Training, Maintenance, Proprietary Rights, Protection, Marketing, Replacement of Parts, and Packing and Shipping must also be considered during the transition.

  4. Publication planning: an effective corporate strategy to influence health professionals.

    PubMed

    2013-12-01

    Pharmaceutical companies integrate scientific publications into the communication strategies they employ to influence the practices of health professionals. In their"publication plan", pharmaceutical companies, or the communication agencies they hire, develop key messages to promote their drugs and then plan in advance how, when and where to disseminate them in medical journals or at conferences. Although their true intent is promotional, these messages must appear to be purely scientific, and are therefore disseminated as research articles, review articles, editorials, commentaries. Publication planning involves the use of "ghost" authors who work directly for pharmaceutical companies, but whose contribution is rarely acknowledged in the final published article. Key opinion leaders are recruited as the honorary authors of these articles, to which they have made little, if any, contribution. The criteria for authorship set by journals that publish primary research articles do not provide adequate protection against the practice of ghost and honorary authorship. Certain journals publishing primary research derive a large proportion of their revenue from selling reprints used by pharmaceutical companies to promote their drugs, especially by their sales representatives.

  5. A new study of China's population control during the past ten years.

    PubMed

    Wei, J

    1989-02-01

    This paper summarizes the control of population in China in the past 10 years and the changes that are occurring. Recently, an increase in the number of family members has directly influenced socioeconomic status by increasing family income and improving living conditions. Rural families have no incentives to control the number of children born. The cyclic effect of the 1962-73 baby boom is also causing a recent surge in population. China has studied these problems and has taken the following measures: new family planning systems have been established; population has been controlled macroscopically and flexibility is allowed at an individual level; governmental family planning organizations have been set up and financed; family planning education has been increased; family planning services have been enforced; incentives and restrictions have been implemented. China must work as a whole to enact and enforce these policies. Families must show restraint in childbearing. The only way for this to be accomplished is by decreasing the socioeconomic incentives to have children. Finally, reforms should be in tune with changing situations.

  6. Reliability demonstration test for load-sharing systems with exponential and Weibull components

    PubMed Central

    Hu, Qingpei; Yu, Dan; Xie, Min

    2017-01-01

    Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn’t yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics. PMID:29284030

  7. Reliability demonstration test for load-sharing systems with exponential and Weibull components.

    PubMed

    Xu, Jianyu; Hu, Qingpei; Yu, Dan; Xie, Min

    2017-01-01

    Conducting a Reliability Demonstration Test (RDT) is a crucial step in production. Products are tested under certain schemes to demonstrate whether their reliability indices reach pre-specified thresholds. Test schemes for RDT have been studied in different situations, e.g., lifetime testing, degradation testing and accelerated testing. Systems designed with several structures are also investigated in many RDT plans. Despite the availability of a range of test plans for different systems, RDT planning for load-sharing systems hasn't yet received the attention it deserves. In this paper, we propose a demonstration method for two specific types of load-sharing systems with components subject to two distributions: exponential and Weibull. Based on the assumptions and interpretations made in several previous works on such load-sharing systems, we set the mean time to failure (MTTF) of the total system as the demonstration target. We represent the MTTF as a summation of mean time between successive component failures. Next, we introduce generalized test statistics for both the underlying distributions. Finally, RDT plans for the two types of systems are established on the basis of these test statistics.

  8. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  9. 77 FR 29317 - Fiscal Year 2011 Draft Work Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-17

    ... DENALI COMMISSION Fiscal Year 2011 Draft Work Plan AGENCY: Denali Commission. ACTION: Notice... develop proposed work plans for future spending and that the annual Work Plan be published in the Federal... Work Plan for Federal Fiscal Year 2011. DATES: Comments and related material to be received by June 10...

  10. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  11. 40 CFR 35.507 - Work plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Work plans. 35.507 Section 35.507... ASSISTANCE Environmental Program Grants for Tribes Preparing An Application § 35.507 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional...

  12. 40 CFR 35.107 - Work plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Work plans. 35.107 Section 35.107... ASSISTANCE Environmental Program Grants Preparing An Application § 35.107 Work plans. (a) Bases for negotiating work plans. The work plan is negotiated between the applicant and the Regional Administrator and...

  13. What Specific Facets of Executive Function are Associated with Academic Functioning in Youth with Attention-Deficit/Hyperactivity Disorder?

    PubMed Central

    Langberg, Joshua M.; Dvorsky, Melissa R.; Evans, Steven W.

    2013-01-01

    The purpose of the study was to evaluate the relation between ratings of Executive Function (EF) and academic functioning in a sample of 94 middle-school-aged youth with Attention-Deficit/Hyperactivity Disorder (ADHD; Mage = 11.9; 78% male; 21% minority). This study builds on prior work by evaluating associations between multiple specific aspects of EF (e.g., working memory, inhibition, and planning and organization) as rated by both parents and teachers on the Behavior Rating Inventory of Executive Function (BRIEF), with multiple academic outcomes, including school grades and homework problems. Further, this study examined the relationship between EF and academic outcomes above and beyond ADHD symptoms and controlled for a number of potentially important covariates, including intelligence and achievement scores. The EF Planning and Organization subscale as rated by both parents and teachers predicted school grades above and beyond symptoms of ADHD and relevant covariates. Parent ratings of youth’s ability to transition effectively between tasks/situations (Shift subscale) also predicted school grades. Parent-rated symptoms of inattention, hyperactivity/impulsivity, and planning and organization abilities were significant in the final model predicting homework problems. In contrast, only symptoms of inattention and the Organization of Materials subscale from the BRIEF were significant in the teacher model predicting homework problems. Organization and planning abilities are highly important aspects academic functioning for middle-school-aged youth with ADHD. Implications of these findings for the measurement of EF, and organization and planning abilities in particular, are discussed along with potential implications for intervention. PMID:23640285

  14. Final Environmental Impact Statement for the Galileo Mission (Tier 2)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    This Final Environmental Impact Statement (FEIS) addresses the proposed action of completing the preparation and operation of the Galileo spacecraft, including its planned launch on the Space Transportation System (STS) Shuttle in October 1989, and the alternative of canceling further work on the mission. The Tier 1 (program level) EIS (NASA 1988a) considered the Titan IV launch vehicle as an alternative booster stage for launch in May 1991 or later. The May 1991 Venus launch opportunity is considered a planetary back-up for the Magellan (Venus Radar Mapper) mission, the Galileo mission, and the Ulysses mission. Plans were underway to enable the use of a Titan IV launch vehicle for the planetary back-up. However, in November 1988, the U.S. Air Force, which procures the Titan IV for NASA, notified NASA that it could not provide a Titan IV vehicle for the May 1991 launch opportunity due to high priority Department of Defense requirements. Consequently, NASA terminated all mission planning for the Titan IV planetary back-up. A minimum of 3 years is required to implement mission-specific modifications to the basic Titan IV launch configuration; therefore, insufficient time is available to use a Titan IV vehicle in May 1991. Thus, the Titan IV launch vehicle is no longer a feasible alternative to the STS/Inertial Upper Stage (IUS) for the May 1991 launch opportunity.

  15. Computer-aided dispatch--traffic management center field operational test final detailed test plan : WSDOT deployment

    DOT National Transportation Integrated Search

    2003-10-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : WSDOT deployment". This document defines the objective, approach,...

  16. Incorporating geometric ray tracing to generate initial conditions for intensity modulated arc therapy optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oliver, Mike; Gladwish, Adam; Craig, Jeff

    2008-07-15

    Purpose and background: Intensity modulated arc therapy (IMAT) is a rotational variant of Intensity modulated radiation therapy (IMRT) that is achieved by allowing the multileaf collimator (MLC) positions to vary as the gantry rotates around the patient. This work describes a method to generate an IMAT plan through the use of a fast ray tracing technique based on dosimetric and geometric information for setting initial MLC leaf positions prior to final IMAT optimization. Methods and materials: Three steps were used to generate an IMAT plan. The first step was to generate arcs based on anatomical contours. The second step wasmore » to generate ray importance factor (RIF) maps by ray tracing the dose distribution inside the planning target volume (PTV) to modify the MLC leaf positions of the anatomical arcs to reduce the maximum dose inside the PTV. The RIF maps were also segmented to create a new set of arcs to improve the dose to low dose voxels within the PTV. In the third step, the MLC leaf positions from all arcs were put through a leaf position optimization (LPO) algorithm and brought into a fast Monte Carlo dose calculation engine for a final dose calculation. The method was applied to two phantom cases, a clinical prostate case and the Radiological Physics Center (RPC)'s head and neck phantom. The authors assessed the plan improvements achieved by each step and compared plans with and without using RIF. They also compared the IMAT plan with an IMRT plan for the RPC phantom. Results: All plans that incorporated RIF and LPO had lower objective function values than those that incorporated LPO only. The objective function value was reduced by about 15% after the generation of RIF arcs and 52% after generation of RIF arcs and leaf position optimization. The IMAT plan for the RPC phantom had similar dose coverage for PTV1 and PTV2 (the same dose volume histogram curves), however, slightly lower dose to the normal tissues compared to a six-field IMRT plan. Conclusion: The use of a ray importance factor can generate initial IMAT arcs efficiently for further MLC leaf position optimization to obtain more favorable IMAT plan.« less

  17. An empirical investigation of female labor-force participation, fertility, age at marriage, and wages in Korea.

    PubMed

    Lee, B S; Mcelwain, A M

    1985-07-01

    The Korean experience raises questions about the assumption that successful economic development and equitable income distribution are preconditions for rapid fertility declines. During the 1960-70 decade, the total fertility rate in Korea declined by 36% and the crude birth rate fell by 33%, in the absence of significant economic development. This paper uses data from the 1974 Korean Fertility Survey to explore the relationships between the factors responsible for this rapid fertility decline. A simultaneous equation model of fertility, age at marriage, extent of labor force participation during marriage, quality of children, and wages is developed and tested. Rather than to provide definitive measures of these interrelationships, the aim was to investigate the utility of treating several variables as being jointly determined. The results suggest that parental education affects fertility by influencing age at marriage, implying that adult education programs will have little effect on marital fertility. There was some evidence that working women whose jobs are compatible with child care have more children than nonworking women, a finding that should be considered in planning increased job opportunities for women. Urbanized women and those who work before marriage tend to marry later than their less urbanized counterparts or women who do not work prior to marriage. Finally, women who used modern methods of birth control had significantly lower fertility than nonusers of modern methods. There is concern that the Government has reduced budgetary appropriations to family planning since the goal of reducing the annual population growth rate from 3% in 1960 to 2% in 1970 was achieved. It is suggested that family planning expenditures should be deployed to areas such as urban slums that have not yet been reached by family planning programs.

  18. SU-E-J-73: Extension of a Clinical OIS/EMR/R&V System to Deliver Safe and Efficient Adaptive Plan-Of-The-Day Treatments Using a Fully Customizable Plan-Library-Based Workflow

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Akhiat, A.; Elekta, Sunnyvale, CA; Kanis, A.P.

    Purpose: To extend a clinical Record and Verify (R&V) system to enable a safe and fast workflow for Plan-of-the-Day (PotD) adaptive treatments based on patient-specific plan libraries. Methods: Plan libraries for PotD adaptive treatments contain for each patient several pre-treatment generated treatment plans. They may be generated for various patient anatomies or CTV-PTV margins. For each fraction, a Cone Beam CT scan is acquired to support the selection of the plan that best fits the patient’s anatomy-of-the-day. To date, there are no commercial R&V systems that support PotD delivery strategies. Consequently, the clinical workflow requires many manual interventions. Moreover, multiplemore » scheduled plans have a high risk of excessive dose delivery. In this work we extended a commercial R&V system (MOSAIQ) to support PotD workflows using IQ-scripting. The PotD workflow was designed after extensive risk analysis of the manual procedure, and all identified risks were incorporated as logical checks. Results: All manual PotD activities were automated. The workflow first identifies if the patient is scheduled for PotD, then performs safety checks, and continues to treatment plan selection only if no issues were found. The user selects the plan to deliver from a list of candidate plans. After plan selection, the workflow makes the treatment fields of the selected plan available for delivery by adding them to the treatment calendar. Finally, control is returned to the R&V system to commence treatment. Additional logic was added to incorporate off-line changes such as updating the plan library. After extensive testing including treatment fraction interrupts and plan-library updates during the treatment course, the workflow is running successfully in a clinical pilot, in which 35 patients have been treated since October 2014. Conclusion: We have extended a commercial R&V system for improved safety and efficiency in library-based adaptive strategies enabling a wide-spread implementation of those strategies. This work was in part funded by a research grant of Elekta AB, Stockholm, Sweden.« less

  19. Optimizing decentralized production-distribution planning problem in a multi-period supply chain network under uncertainty

    NASA Astrophysics Data System (ADS)

    Nourifar, Raheleh; Mahdavi, Iraj; Mahdavi-Amiri, Nezam; Paydar, Mohammad Mahdi

    2017-09-01

    Decentralized supply chain management is found to be significantly relevant in today's competitive markets. Production and distribution planning is posed as an important optimization problem in supply chain networks. Here, we propose a multi-period decentralized supply chain network model with uncertainty. The imprecision related to uncertain parameters like demand and price of the final product is appropriated with stochastic and fuzzy numbers. We provide mathematical formulation of the problem as a bi-level mixed integer linear programming model. Due to problem's convolution, a structure to solve is developed that incorporates a novel heuristic algorithm based on Kth-best algorithm, fuzzy approach and chance constraint approach. Ultimately, a numerical example is constructed and worked through to demonstrate applicability of the optimization model. A sensitivity analysis is also made.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frenkel, G.; Paterson, T.S.; Smith, M.E.

    The Institute for Defense Analyses (IDA) has collected and analyzed information on battle management algorithm technology that is relevant to Battle Management/Command, Control and Communications (BM/C3). This Memorandum Report represents a program plan that will provide the BM/C3 Directorate of the Strategic Defense Initiative Organization (SDIO) with administrative and technical insight into algorithm technology. This program plan focuses on current activity in algorithm development and provides information and analysis to the SDIO to be used in formulating budget requirements for FY 1988 and beyond. Based upon analysis of algorithm requirements and ongoing programs, recommendations have been made for research areasmore » that should be pursued, including both the continuation of current work and the initiation of new tasks. This final report includes all relevant material from interim reports as well as new results.« less

  1. Final Report for the Arroyo Las Positas Maintenance Impact Study, Lawrence Livermore National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    van Hattem, M; Paterson, L

    2006-01-12

    In 2000, the Lawrence Livermore National Laboratory's (LLNL) Environmental Protection Department, in coordination with Plant Engineering (PE), began dredging sections of the Arroyo Las Positas (ALP) to alleviate concerns about flooding of sensitive facilities within the mainsite of Lawrence Livermore National Laboratory. In order to reduce potential impacts on the federally threatened California red-legged frog (Rana aurora draytonii), LLNL proposed to dredge sections of the ALP in a ''checkerboard pattern'', resulting in a mosaic of open water habitat and vegetated sections (Figure 1). The Arroyo Las Positas Management Plan (Plan) was coordinated with both state and federal agencies including themore » U.S. Fish and Wildlife Service (USFWS), California Department of Fish and Game (CDF&G), San Francisco Regional Water Quality Control Board (SFRWQCB), and the Army Corp of Engineers (ACOE). Water Discharge Requirements (WDRs) were issued for this project on December 30, 1999 (Order No. 99-086) by the SFRWQCB. Provision 19 of the WDRs outlined a five-year (2000 through 2004) Maintenance Impact Study (MIS) that LLNL began in coordination with dredging work that was conducted as part of the Arroyo Las Positas Management Plan. Provision 20 of these WDRs requires LLNL to submit a final report of the results of the Maintenance Impact Study for this project to the SFRWQCB. The purpose of this report is to present the results of the Maintenance Impact Study for Arroyo Las Positas and meet the requirements of Provision 20. A description of the annual monitoring included in this Maintenance Impact Study is included in the methods section of this report. Initially the Plan called for dredging the entire length of the Arroyo Las Positas (approximately 6,981 linear feet) over a 5-year period to minimize temporal impacts on the California red-legged frog. Dredging occurred in 2000 ({approx}1,300 ft.), 2001 ({approx}800 ft.), and 2002 ({approx}1,200 ft.), which constituted approximately 3,300 ft., or roughly half of the entire Plan (Figure 2). Logistical challenges and unanticipated cost influenced the decision to terminate the project prior to completion, and re-evaluate the long-term management goals for the ALP. No dredging was conducted in the final two years of the plan (2003 and 2004).« less

  2. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.13 Section 23.13 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  3. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  4. [Health emergencies and first aid at construction sites in the Tuscany Region. The high speed and varying free way of Valico].

    PubMed

    De Luca, D

    2006-01-01

    From 1996 the territory of Tuscany region and in particular that one of ASL 10 of Florence, has been interested from the realization of great works: the railway line to High Speed and varying of Valico of the A1 freeway between Florence and Bologna. ASL 10 has stipulated specific economic agreements with the been involved companies in the realization of the plans for a plan finalized to the prevention of the industrial accidents and to limit of the gravity with timely aids it adapts to you also in gallery, to guarantee to the workers the same performances sanitary of the city residents, to guarantee and to improve the quality of existing sanitary services on the territories in spite of the increase of the population weighing on the consequent territory to the takeover of the workers it engages to you in the realization of the great works. This plan has been realized with the creation of integrated aid system a to strengthen the territorial sanitary emergency, I extend the access to the base medicine to the workers and has not been able itself to answer to 93% of the question sanitary to the inside of the same yards with the infirmaries of yard without to resort to external structures.

  5. 75 FR 4417 - Wind Cave National Park, Custer County, SD

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... DEPARTMENT OF THE INTERIOR Wind Cave National Park, Custer County, SD AGENCY: National Park... Final Environmental Impact Statement, Wind Cave National Park, Custer County, South Dakota. SUMMARY... Management Plan and Final Environmental Impact Statement (Plan), Wind Cave National Park, Custer County...

  6. Computer-aided dispatch--traffic management center field operational test final test plans : state of Utah

    DOT National Transportation Integrated Search

    2004-01-01

    The purpose of this document is to expand upon the evaluation components presented in "Computer-aided dispatch--traffic management center field operational test final evaluation plan : state of Utah". This document defines the objective, approach, an...

  7. Hazardous material transportation safety and security field operational test final detailed test plans : executive summary

    DOT National Transportation Integrated Search

    2003-09-16

    The objective of this Hazardous Material (HazMat) Transportation Safety and Security Field Operational Test (FOT) Final Detailed Test Plans evaluation is to measure the impact of technology solutions on the safety, security, and operational efficienc...

  8. The EPOS Architecture: Integrated Services for solid Earth Science

    NASA Astrophysics Data System (ADS)

    Cocco, Massimo; Consortium, Epos

    2013-04-01

    The European Plate Observing System (EPOS) represents a scientific vision and an IT approach in which innovative multidisciplinary research is made possible for a better understanding of the physical processes controlling earthquakes, volcanic eruptions, unrest episodes and tsunamis as well as those driving tectonics and Earth surface dynamics. EPOS has a long-term plan to facilitate integrated use of data, models and facilities from existing (but also new) distributed research infrastructures, for solid Earth science. One primary purpose of EPOS is to take full advantage of the new e-science opportunities coming available. The aim is to obtain an efficient and comprehensive multidisciplinary research platform for the Earth sciences in Europe. The EPOS preparatory phase (EPOS PP), funded by the European Commission within the Capacities program, started on November 1st 2010 and it has completed its first two years of activity. EPOS is presently mid-way through its preparatory phase and to date it has achieved all the objectives, milestones and deliverables planned in its roadmap towards construction. The EPOS mission is to integrate the existing research infrastructures (RIs) in solid Earth science warranting increased accessibility and usability of multidisciplinary data from monitoring networks, laboratory experiments and computational simulations. This is expected to enhance worldwide interoperability in the Earth Sciences and establish a leading, integrated European infrastructure offering services to researchers and other stakeholders. The Preparatory Phase aims at leveraging the project to the level of maturity required to implement the EPOS construction phase, with a defined legal structure, detailed technical planning and financial plan. We will present the EPOS architecture, which relies on the integration of the main outcomes from legal, governance and financial work following the strategic EPOS roadmap and according to the technical work done during the first two years in order to establish an effective implementation plan guaranteeing long term sustainability for the infrastructure and the associated services. We plan to describe the RIs to be integrated in EPOS and to illustrate the initial suite of integrated and thematic core services to be offered to the users. We will present examples of combined data analyses and we will address the importance of opening our research infrastructures to users from different communities. We will describe the use-cases identified so far in order to allow stakeholders and potential future users to understand and interact with the EPOS infrastructure. In this framework, we also discuss the global perspectives for data infrastructures in order to verify the coherency of the EPOS plans and present the EPOS contributions. We also discuss the international cooperation initiatives in which EPOS is involved emphasizing the implications for solid Earth data infrastructures. In particular, EPOS and the satellite Earth Observation communities are collaborating in order to promote the integration of data from in-situ monitoring networks and satellite observing systems. Finally, we will also discuss the priorities for the third year of activity and the key actions planned to better involve users in EPOS. In particular, we will discuss the work done to finalize the design phase as well as the activities to start the validation and testing phase of the EPOS infrastructure.

  9. Resection planning for robotic acoustic neuroma surgery

    NASA Astrophysics Data System (ADS)

    McBrayer, Kepra L.; Wanna, George B.; Dawant, Benoit M.; Balachandran, Ramya; Labadie, Robert F.; Noble, Jack H.

    2016-03-01

    Acoustic neuroma surgery is a procedure in which a benign mass is removed from the Internal Auditory Canal (IAC). Currently this surgical procedure requires manual drilling of the temporal bone followed by exposure and removal of the acoustic neuroma. This procedure is physically and mentally taxing to the surgeon. Our group is working to develop an Acoustic Neuroma Surgery Robot (ANSR) to perform the initial drilling procedure. Planning the ANSR's drilling region using pre-operative CT requires expertise and around 35 minutes' time. We propose an approach for automatically producing a resection plan for the ANSR that would avoid damage to sensitive ear structures and require minimal editing by the surgeon. We first compute an atlas-based segmentation of the mastoid section of the temporal bone, refine it based on the position of anatomical landmarks, and apply a safety margin to the result to produce the automatic resection plan. In experiments with CTs from 9 subjects, our automated process resulted in a resection plan that was verified to be safe in every case. Approximately 2 minutes were required in each case for the surgeon to verify and edit the plan to permit functional access to the IAC. We measured a mean Dice coefficient of 0.99 and surface error of 0.08 mm between the final and automatically proposed plans. These preliminary results indicate that our approach is a viable method for resection planning for the ANSR and drastically reduces the surgeon's planning effort.

  10. Natural stones of historic and future importance in Sweden

    NASA Astrophysics Data System (ADS)

    Schouenborg, Björn; Andersson, Jenny; Göransson, Mattias

    2013-04-01

    Several activities and responsibilities of the Geological Survey of Sweden (SGU) are related to the work of the newly formed international Heritage Stone Task Group (HSTG) for designating historically important stones. SGU is among other things a referral organization, frequently dealing with the preparation of statements in connection with the quarrying permit applications of stone producers. When preparing these statements, SGU takes into account a number of parameters, e.g. the importance for local and regional business development, historic importance, area of occurrence, quality of the geological documentation of the stone type, peculiarities of the stone types and technical properties relevant for the intended use. Traditionally, SGU has not worked with bedrock mapping looking at the potential of natural stones production but more commonly looking at the potential production of aggregates, industrial minerals and metals. The competence is, therefore, presently being built up with new databases over important natural stone types and definition of criteria for their selection etc. In this respect the criteria defined by the HSTG provide important help. This work goes hand in hand with the task of proposing stone-deposits and quarries of "national interest". The criteria for selection of a stone type, quarry etc as one of national interest are currently being revised. SGU plays an important role in this work. However, the final decision and appointment lies in the hands of the Swedish Board of Housing, Building and Planning (Boverket), an authority dealing with sustainable land use and regional development, town and country planning. Boverket supervises how the planning legislation is handled by the municipal authorities and the county administrative boards. The two latter organizations are those in charge of giving extraction permits for stone quarrying. The "Hallandia gneiss", of SW Sweden, is described as a case story and presented in this paper. Keywords: Hallandia gneiss, natural stones, historic stones, urban planning and building

  11. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  12. 7 CFR 23.6 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Plan of Work. 23.6 Section 23.6 Agriculture Office of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK State Program § 23.6 Plan of Work. (a) A State Annual Plan of Work for carrying out the programs authorized under title V shall be...

  13. 75 FR 70114 - Amendment to the Interim Final Rules for Group Health Plans and Health Insurance Coverage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ...This document contains an amendment to interim final regulations implementing the rules for group health plans and health insurance coverage in the group and individual markets under provisions of the Patient Protection and Affordable Care Act regarding status as a grandfathered health plan; the amendment permits certain changes in policies, certificates, or contracts of insurance without loss of grandfathered status.

  14. Long-Range Strategic Planning for Libraries & Information Resources in the Research University. The Final Report on a Research Program on the Future of the Academic Research Library.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Graduate School of Library and Information Science.

    This final report on a project at the University of California at Los Angeles (UCLA) on strategic planning for libraries and information resources in the research university begins with an introductory section on levels of consideration in planning; issues of current concern (effects of technology, economics of libraries, changes in the academic…

  15. Hawaii State Plan for Occupational Safety and Health. Final rule.

    PubMed

    2012-09-21

    This document announces the Occupational Safety and Health Administration's (OSHA) decision to modify the Hawaii State Plan's ``final approval'' determination under Section 18(e) of the Occupational Safety and Health Act (the Act) and to transition to ``initial approval'' status. OSHA is reinstating concurrent federal enforcement authority over occupational safety and health issues in the private sector, which have been solely covered by the Hawaii State Plan since 1984.

  16. Medicare program; revisions to the Medicare Advantage and Part D prescription drug contract determinations, appeals, and intermediate sanctions processes. Final rule with comment period.

    PubMed

    2007-12-05

    This rule with comment period finalizes the Medicare program provisions relating to contract determinations involving Medicare Advantage (MA) organizations and Medicare Part D prescription drug plan sponsors, including eliminating the reconsideration process for review of contract determinations, revising the provisions related to appeals of contract determinations, and clarifying the process for MA organizations and Part D plan sponsors to complete corrective action plans. In this final rule with comment period, we also clarify the intermediate sanction and civil money penalty (CMP) provisions that apply to MA organizations and Medicare Part D prescription drug plan sponsors, modify elements of their compliance plans, retain voluntary self-reporting for Part D sponsors and implement a voluntary self-reporting recommendation for MA organizations, and revise provisions to ensure HHS has access to the books and records of MA organizations and Part D plan sponsors' first tier, downstream, and related entities. Although we have decided not to finalize the mandatory self-reporting provisions that we proposed, CMS remains committed to adopting a mandatory self-reporting requirement. To that end, we are requesting comments that will assist CMS in crafting a future proposed regulation for a mandatory self-reporting requirement.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael Ebert

    This is the final report for the DOE-NETL grant entitled 'Creating New Incentives for Risk Identification & Insurance Processes for the Electric Utility Industry' and later, 'Energy & Risk Transfer Assessment'. It reflects work done on projects from 15 August 2004 to 29 February 2008. Projects were on a variety of topics, including commercial insurance for electrical utilities, the Electrical Reliability Organization, cost recovery by Gulf State electrical utilities after major hurricanes, and review of state energy emergency plans. This Final Technical Report documents and summarizes all work performed during the award period, which in this case is from 15more » August 2004 (date of notification of original award) through 29 February 2008. This report presents this information in a comprehensive, integrated fashion that clearly shows a logical and synergistic research trajectory, and is augmented with findings and conclusions drawn from the research as a whole. Four major research projects were undertaken and completed during the 42 month period of activities conducted and funded by the award; these are: (1) Creating New Incentives for Risk Identification and Insurance Process for the Electric Utility Industry (also referred to as the 'commercial insurance' research). Three major deliverables were produced: a pre-conference white paper, a two-day facilitated stakeholders workshop conducted at George Mason University, and a post-workshop report with findings and recommendations. All deliverables from this work are published on the CIP website at http://cipp.gmu.edu/projects/DoE-NETL-2005.php. (2) The New Electric Reliability Organization (ERO): an examination of critical issues associated with governance, standards development and implementation, and jurisdiction (also referred to as the 'ERO study'). Four major deliverables were produced: a series of preliminary memoranda for the staff of the Office of Electricity Delivery and Energy Reliability ('OE'), an ERO interview protocol and stakeholder/experts interviews, a formal research paper, and a data quality and availability study of North American Electric Reliability Corporation/ERO's disturbances and outages working group ('DAWG') databases. (3) Critical Electric Power Infrastructure Recovery and Reconstruction: Issues & New Policy Initiatives in Four Gulf Coast States After 2005's Catastrophic Hurricanes (also referred to as the 'Gulf Coast cost recovery study'). Four deliverables were produced: the original research paper providing preliminary findings and recommendations (29 September 2006), a formal presentation of that report to officials, staff and invited guests at OE's Washington, DC headquarters, a series of update memoranda and quarterly activity updates (1 November 2006 through Q3-2007), and a final cumulative update of the original research report (February 2008). Documentation and information on these research activities can be found on the CIP website at http://cipp.gmu.edu/projects/DoE-NETL-2006.php. (4) Evaluation of State Energy Emergency Response Plans (also referred to as the 'SEERP project'). Two major deliverables were produced: an evaluation of 47 SEERPs with findings, statistical analyses, geospatial renderings (mappings of the States whose plans were evaluated with statistical analysis underpinnings) and recommendations (17 September 2007), and a major revision to the original deliverable to include one additional plan (Missouri), with fully updated findings, statistical analyses, geospatial renderings, and recommendations (Revision 1, 29 February 2008).« less

  18. TRACON Aircraft Arrival Planning and Optimization Through Spatial Constraint Satisfaction

    NASA Technical Reports Server (NTRS)

    Bergh, Christopher P.; Krzeczowski, Kenneth J.; Davis, Thomas J.; Denery, Dallas G. (Technical Monitor)

    1995-01-01

    A new aircraft arrival planning and optimization algorithm has been incorporated into the Final Approach Spacing Tool (FAST) in the Center-TRACON Automation System (CTAS) developed at NASA-Ames Research Center. FAST simulations have been conducted over three years involving full-proficiency, level five air traffic controllers from around the United States. From these simulations an algorithm, called Spatial Constraint Satisfaction, has been designed, coded, undergone testing, and soon will begin field evaluation at the Dallas-Fort Worth and Denver International airport facilities. The purpose of this new design is an attempt to show that the generation of efficient and conflict free aircraft arrival plans at the runway does not guarantee an operationally acceptable arrival plan upstream from the runway -information encompassing the entire arrival airspace must be used in order to create an acceptable aircraft arrival plan. This new design includes functions available previously but additionally includes necessary representations of controller preferences and workload, operationally required amounts of extra separation, and integrates aircraft conflict resolution. As a result, the Spatial Constraint Satisfaction algorithm produces an optimized aircraft arrival plan that is more acceptable in terms of arrival procedures and air traffic controller workload. This paper discusses the current Air Traffic Control arrival planning procedures, previous work in this field, the design of the Spatial Constraint Satisfaction algorithm, and the results of recent evaluations of the algorithm.

  19. Dose as a Tool for Planning and Implementing Community-Based Health Strategies.

    PubMed

    Kuo, Elena S; Harner, Lisa T; Frost, Madeline C; Cheadle, Allen; Schwartz, Pamela M

    2018-05-01

    A major challenge in community-based health promotion is implementing strategies that could realistically improve health at the population level. Population dose methodology was developed to help understand the combined impact of multiple strategies on population-level health behaviors. This paper describes one potential use of dose: as a tool for working collaboratively with communities to increase impact when planning and implementing community-level initiatives. Findings are presented from interviews conducted with 11 coordinators who used dose for planning and implementing local efforts with community coalitions. During early-stage planning, dose was used as a tool for strategic planning, and as a framework to build consensus among coalition partners. During implementation, a dose lens was used to revise strategies to increase their reach (the number of people exposed to the intervention) or strength (the relative change in behavior for each exposed person) to create population-level impact. A case study is presented, illustrating how some community coalitions and evaluators currently integrate dose into the planning and implementation of place-based healthy eating and active living strategies. Finally, a planning checklist was developed for program coordinators and evaluators. This article is part of a supplement entitled Building Thriving Communities Through Comprehensive Community Health Initiatives, which is sponsored by Kaiser Permanente, Community Health. Copyright © 2018 American Journal of Preventive Medicine. Published by Elsevier Inc. All rights reserved.

  20. Transportation planning performance measures : final report.

    DOT National Transportation Integrated Search

    2005-10-01

    Oregon transportation plans, including the statewide Oregon Transportation Plan, and current regional transportation plans for the Portland, Salem, Eugene, and Medford metropolitan areas, contain some policy areas that are not adequately addressed by...

  1. Cultural Resource Protection Plan for the Remote-Handled Low-Level Waste Disposal Facility at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pace, Brenda Ringe; Gilbert, Hollie Kae

    2015-05-01

    This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less

  2. Resilience, integrated development and family planning: building long-term solutions.

    PubMed

    De Souza, Roger-Mark

    2014-05-01

    For the many individuals and communities experiencing natural disasters and environmental degradation, building resilience means becoming more proficient at anticipating, preventing, recovering, and rebuilding following negative shocks and stresses. Development practitioners have been working to build this proficiency in vulnerable communities around the world for several decades. This article first examines the meaning of resilience as a component of responding to disasters and some of the key components of building resilience. It then summarises approaches to resilience developed by the Rockefeller and Packard Foundations, the Intergovernmental Panel on Climate Change, USAID and DFID, which show how family planning services can contribute to resilience. Next, it gives some examples of how family planning has been integrated into some current environment and development programmes. Finally, it describes how these integrated programmes have succeeded in helping communities to diversify livelihoods, bolster community engagement and resilience, build new governance structures, and position women as agents of change. Copyright © 2014 Reproductive Health Matters. Published by Elsevier Ltd. All rights reserved.

  3. 76 FR 76180 - Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Suisun Marsh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...) Federal joint lead agencies, and the State of California Department of Fish and Game (DFG), acting as the..., Preservation, and Restoration Plan (SMP) Final EIS/EIR. The SMP is a comprehensive plan designed to address the...

  4. Final Approval of Arizona Air Plan Revision; Lead-bearing Fugitive Dust Associated With Hayden, AZ Copper Smelter

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to a portion of the Arizona State Implementation Plan (SIP) concerning emissions of lead-bearing fugitive dust associated with the primary copper smelter located in Hayden, Arizona.

  5. 77 FR 38801 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ... Resource Management (VRM) Plan, Amendment, Class Designation, Carbon County, WY, Review Period Ends: 07/30... Final Vehicle Management Plan, Implementation, Denali National Park and Preserve, AK, Review Period Ends.... EIS No. 20120199, Final EIS, RUS, MS, ADOPTION--Kemper County Integrated Gasification Combined Cycle...

  6. SmartStaff: A Support Concept for Staff Planning

    DTIC Science & Technology

    2000-11-01

    facilitated time management and decreased the ambiguities of the plans presented. However, the quality of the final plan did not improve. Team decision making, Team Planning, Group Support Systems, Task Group Staff

  7. Short and long-term career plans of final year dental students in the United Arab Emirates.

    PubMed

    Rashid, Hazim H; Ghotane, Swapnil G; Abufanas, Salem H; Gallagher, Jennifer E

    2013-08-13

    New dental schools have been established to train dentists in many parts of the world. This study examines the future dental workforce from the first dental school in the United Arab Emirates [UAE]; the aim of this study was to explore the short and long-term career aspirations of the final year dental students in the UAE in relation to their demography. Final year dental students of the Ajman University's College of Dentistry (n=87) were invited to participate in a self-completion questionnaire survey. Descriptive analysis, chi-square tests, and binary logistic regression analysis were carried out on career aspirations using SPSS v20. Eighty-two percent of students (n=71) responded, the majority of whom were female (65%; n=46). Ethnicity was reported as: 'other Arab' (61%; n=43), 'Emirati' (17%, n=12), and 'Other' (21%, n=15). In the short-term, 41% (n=29) expressed a desire to work in government training centres, with Emirati students significantly more likely to do so (p=0.002). 'Financial stability' (80%; n=57) and 'gaining professional experience' (76%; n=54) emerged as the most important influences on their short-term career plans. The vast majority of students wished to specialise in dentistry (92%; n=65) in the longer term; logistic regression analysis revealed that the odds of specialising in the most popular specialties of Orthodontics and Oral and Maxillofacial Surgery were less for the 'Other' ethnic group when compared with 'Emirati' students (0.26; 95% CI 0.068-0.989; p=0.04). Almost three-quarters of the students overall (72%; n=51) intended to work full-time. 'High income/financial security' (97%; n=69), 'standard of living' (97%; n=69), 'work/life balance' (94%; n=67), and 'professional fulfilment' (87%; n=62) were reported by the students as the most influential items affecting their long-term professional career choices. The findings suggest that students aspire to make a long-term contribution to the profession and there is a high level of interest in specialisation with a desire to achieve financial stability and quality of life.

  8. Miami Valley ITS : early deployment plan : final user service plan

    DOT National Transportation Integrated Search

    1997-07-01

    This User Service Plan is the first major product of the process to develop an Intelligent Transportation System (ITS) Early Deployment Plan (EDP) for the Miami Valley. This User Service Plan documents the travel environment, growth trends and transp...

  9. California Air Quality State Implementation Plans; Final Approval; Butte County Air Quality Management District; Stationary Source Permits

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the Butte County Air Quality Management District (BCAQMD) portion of the California State Implementation Plan (SIP). This revision concerns the District's New Source Review (NSR) permitting program.

  10. Strategic Planning Study Team. Final Report.

    ERIC Educational Resources Information Center

    Tennessee Univ., Chattanooga.

    This final report presents the results of a University of Tennessee at Chattanooga's (UTC) strategic planning study team, which was charged with documenting computerized services currently available and recommending to the UTC administration areas in which new services should be introduced at the university. A questionnaire was administered to…

  11. 76 FR 50413 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  12. 78 FR 68739 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 76 FR 8649 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  14. 77 FR 22215 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  15. 76 FR 27889 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  16. 76 FR 63836 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  17. 78 FR 11093 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  18. 76 FR 21252 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  19. 77 FR 41270 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  20. 76 FR 2578 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  1. 78 FR 62426 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  2. 77 FR 28477 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  3. 78 FR 42009 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  4. 78 FR 2881 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  5. 76 FR 70639 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  6. 75 FR 69588 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  7. 77 FR 68685 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  8. 76 FR 41689 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  9. 78 FR 28490 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  10. 77 FR 2015 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-13

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  11. 77 FR 8730 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  12. 78 FR 22192 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  13. 77 FR 62433 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends the Pension Benefit Guaranty Corporation's regulation...

  14. 75 FR 63380 - Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... PENSION BENEFIT GUARANTY CORPORATION 29 CFR Part 4022 Benefits Payable in Terminated Single-Employer Plans; Interest Assumptions for Paying Benefits AGENCY: Pension Benefit Guaranty Corporation. ACTION: Final rule. SUMMARY: This final rule amends Pension Benefit Guaranty Corporation's regulation on...

  15. Patient Protection and Affordable Care Act; third party payment of qualified health plan premiums. Interim final rule with comment period.

    PubMed

    2014-03-19

    This interim final rule requires issuers of qualified health plans (QHPs), including stand-alone dental plans (SADPs), to accept premium and cost-sharing payments made on behalf of enrollees by the Ryan White HIV/AIDS Program, other Federal and State government programs that provide premium and cost sharing support for specific individuals, and Indian tribes, tribal organizations, and urban Indian organizations.

  16. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  17. FInal Report: Site Investigation Results, 2009-2011, at Inman, Kansas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) operated a grain storage facility at the southern edge of the city of Inman, Kansas, from 1954 to 1965. During this time, commercial grain fumigants containing carbon tetrachloride were in common use by the grain storage industry to preserve grain in their facilities. In 1997, trace to low levels of carbon tetrachloride (below the maximum contamination level [MCL] of 5.0 μg/L) were detected in three private wells near the former grain storage facility at Inman, as part of a statewide USDA private well sampling program that was implemented bymore » the Kansas Department of Health and Environment (KDHE) near former CCC/USDA facilities. No public water supply wells were identified in 1998 by the KDHE within 1 mi of the town. Carbon tetrachloride is the contaminant of primary concern at sites associated with grain storage operations. To determine whether the former CCC/USDA facility at Inman is a potential contaminant source and its possible relationship to the contamination in groundwater, the CCC/USDA agreed to conduct investigations at Inman. The investigations were performed by the Environmental Science Division of Argonne National Laboratory in accordance with the Intergovernmental Agreement between the KDHE and the Farm Service Agency of the USDA. Argonne, on behalf of the CCC/USDA, developed a Work Plan (Argonne 2007) and subsequently a Summary of Investigation Results and Proposed Work Plan (Appendix A) for a phased site investigation. The proposed work was approved by the KDHE (2007, 2011). The investigations were conducted from November 2009 to September 2011, as proposed in the two work plans. This report presents the findings of the 2009-2011 investigations at Inman.« less

  18. Building confidence for work as house officers: student experience in the final year of a new problem-based curriculum.

    PubMed

    Whitehouse, Carl R; O'Neill, Paul; Dornan, Tim

    2002-08-01

    Newly qualified doctors require an appropriate level of confidence for their new roles. Development of this confidence was a key objective in the final year of a new integrated course with an emphasis on student self-direction. There are 5 placements in the final year course. Students use a Learning Planner to help them choose suitable placements and objectives to serve their learning needs. Educational supervision focuses on helping students determine their objectives and assessing them against these. Course evaluation was by means of a questionnaire during final assessments. Cohorts of 310 and 316 students in successive years completed the evaluation. The interrelationship between variables was explored using logistic regression. 220/310 students in the 2000 cohort and 214/316 in the 2001 cohort agreed they felt confident with their prospective role as a pre-registration house officer (PRHO). Confidence was significantly associated with confidence in their clinical skills, belief in their ability to cope with uncertainty and feeling able to work as a team member. The experience of the 2 hospital placements and (in 2000 only) the elective was associated with increased confidence. In all placements helpful educational supervision and the achievement of the self-directed learning plan was associated with increased confidence as a potential doctor. Students perceive a relationship between learning experiences in the final year of a self-directed course and development of confidence for their future role. Whilst further elucidation of the nature of this relationship is required, this provides encouragement to curriculum planners to promote self-direction.

  19. Offline motion planning and simulation of two-robot welding coordination

    NASA Astrophysics Data System (ADS)

    Zhang, Tie; Ouyang, Fan

    2012-03-01

    This paper focuses on the two-robot welding coordination of complex curve seam which means one robot grasp the workpiece, the other hold the torch, the two robots work on the same workpiece simultaneously. This paper builds the dual-robot coordinate system at the beginning, and three point calibration method of two robots' relative base coordinate system is presented. After that, the non master/slave scheme is chosen for the motion planning, the non master/slave scheme sets the poses versus time function of the point u on the workpiece, and calculates the two robot end effecter trajectories through the constrained relationship matrix automatically. Moreover, downhand welding is employed which can guarantee the torch and the seam keep in good contact condition all the time during the welding. Finally, a Solidworks-Sim Mechanics simulation platform is established, and a simulation of curved steel pipe welding is conducted. The results of the simulation illustrate the welding process can meet the requirements of downhand welding, the joint displacement curves are smooth and continuous and no joint velocities are out of working scope.

  20. Design of the optical backscatter diagnostic for laser plasma interaction measurements on NIF

    NASA Astrophysics Data System (ADS)

    Moody, J. D.; Datte, P.; Ng, E.; Maitland, K.; Hsing, W.; MacGowan, B. J.; Froula, D. H.; Neumayer, P.; Sutter, L.; Meezan, N.; Glenzer, S. H.; Kirkwood, R. K.; Divol, L.; Andrews, S.; Jackson, J.; MacKinnon, A.; Jovanovic, I.; Beeler, R.; Bertolini, L.; Landon, M.; Alvarez, S.; Lee, T.; Watts, P.

    2007-11-01

    We describe the design of the backscatter diagnostic for NIF laser-plasma interaction (LPI) studies. It will initially be used to validate the 280 eV point design hohlraum and select phase plates for the ignition experiments. Backscatter measurements are planned for two separate groups of 4 beams (a quad). One quad is 30^o from the hohlraum axis and the other at 50^o. The backscatter measurement utilizes 2 instruments for each beam quad. The full aperture backscatter system (FABS) measures light backscattered into the final focus lens of each beam in the quad. The near backscatter imager (NBI) measures light backscattered outside of the beam quad. Both instruments must work in conjunction to provide spectrally and temporally resolved backscatter power. We describe the design of the diagnostic and its capabilities as well as plans for calibrating it and analyzing the resulting data. This work was performed under the auspices of the U.S. Department of Energy by University of California, Lawrence Livermore National Laboratory under Contract W-7405-Eng-48.

  1. Operational Simulation Tools and Long Term Strategic Planning for High Penetrations of PV in the Southeastern United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuohy, Aidan; Smith, Jeff; Rylander, Matt

    2016-07-11

    Increasing levels of distributed and utility scale Solar Photovoltaics (PV) will have an impact on many utility functions, including distribution system operations, bulk system performance, business models and scheduling of generation. In this project, EPRI worked with Southern Company Services and its affiliates and the Tennessee Valley Authority to assist these utilities in their strategic planning efforts for integrating PV, based on modeling, simulation and analysis using a set of innovative tools. Advanced production simulation models were used to investigate operating reserve requirements. To leverage existing work and datasets, this last task was carried out on the California system. Overall,more » the project resulted in providing useful information to both of the utilities involved and through the final reports and interactions during the project. The results from this project can be used to inform the industry about new and improved methodologies for understanding solar PV penetration, and will influence ongoing and future research. This report summarizes each of the topics investigated over the 2.5-year project period.« less

  2. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  3. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  4. 7 CFR 1924.5 - Planning development work.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 12 2011-01-01 2011-01-01 false Planning development work. 1924.5 Section 1924.5... Planning development work. (a) Extent of development. For an FO loan, the plans for development will... for development work. The total cash cost of all planned development will be shown on Form FmHA or its...

  5. Phase B: Final definition and preliminary design study for the initial Atmospheric Cloud Physics Laboratory (ACPL), a spacelab mission payload

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A preliminary identification of the Supporting Research and Technology (SR&T) necessary during the planned evolution of atmospheric cloud physics is discussed. All requirements are for subsequent flights over its expected ten year lifetime. Those components identified as requiring some SR&T work prior to inclusion are listed. A data sheet is included for each item, briefly justifying the need, giving general objectives for the proposed development effort and identifying approximate schedule requirements on the program.

  6. 2nd Generation Reusable Launch Vehicle (2G RLV). Revised

    NASA Technical Reports Server (NTRS)

    Matlock, Steve; Sides, Steve; Kmiec, Tom; Arbogast, Tim; Mayers, Tom; Doehnert, Bill

    2001-01-01

    This is a revised final report and addresses all of the work performed on this program. Specifically, it covers vehicle architecture background, definition of six baseline engine cycles, reliability baseline (space shuttle main engine QRAS), and component level reliability/performance/cost for the six baseline cycles, and selection of 3 cycles for further study. This report further addresses technology improvement selection and component level reliability/performance/cost for the three cycles selected for further study, as well as risk reduction plans, and recommendation for future studies.

  7. SANDERLING Final Report: Parts A and B, A Research Study into KBS for Command and Control in Naval and TMD Applications

    DTIC Science & Technology

    1990-04-01

    focus of attention ). The inherent local control in the FA/C model allows it to achieve just that, since it only requires a global goal to become...Computing Terms Agent Modelling : is concerned with modelling actor’s intentions and plans, and their modification in the light of information... model or program that is based on a mathematical system of logic. B-tree : or "binary-tree" is a self organising storage mechanism that works by taking

  8. DHS HS-STEM Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Russell, Anna Christine

    2014-09-01

    Throughout my HS-STEM internship, I worked on two different projects with a systems analysis group at Sandia National Laboratories in Livermore, California (SNLCA). The first, and primary, project entailed building a conceptual model of health surveillance detection of a bioterror attack. The second project was much smaller in scope and looked at cost tradeoffs between volumetric and surface decontamination after the release of anthrax in a city. Both projects helped me to understand the challenges of planning for a bioterror attack and the importance of preparedness in the public health sector.

  9. Airport electrotechnology resource guide. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geba, V.; Nesbit, M.

    1998-06-01

    Electrotechnologies offer utilities a cutting edge marketing tool to work with airport customers to increase passenger comfort, and achieve environmental and economic goals. At the same time, utility objectives such as customer retention, and revenue and sales goals can be enhanced. This guide provides electric utility marketing staff with the necessary information to market electrotechnologies in airport applications. The airport industry is profiled and an overview of airport building, infrastructure technologies and electric vehicles is provided. In addition, the guide offers market strategies for customer targeting, market research, market plan development and development of trade ally partnerships.

  10. Louisiana's 2017 Master Plan for a Sustainable Coast

    NASA Astrophysics Data System (ADS)

    Haase, B.

    2017-12-01

    The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement

  11. 25 CFR 1000.20 - What is required in a planning report?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... planning phase, the Tribe/Consortium must prepare and submit to the Secretary a final planning report. (a... Tribe's/Consortium's planning efforts have revealed that its current organization is adequate to assume...

  12. Patient Protection and Affordable Care Act; Market Stabilization. Final rule.

    PubMed

    2017-04-18

    This rule finalizes changes that will help stabilize the individual and small group markets and affirm the traditional role of State regulators. This final rule amends standards relating to special enrollment periods, guaranteed availability, and the timing of the annual open enrollment period in the individual market for the 2018 plan year; standards related to network adequacy and essential community providers for qualified health plans; and the rules around actuarial value requirements.

  13. 77 FR 60137 - Lee Metcalf National Wildlife Refuge, Ravalli County, MT; Final Comprehensive Conservation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    .... The final plan identifies goals, objectives, and strategies that describe the future management of the... management purpose, for migratory birds'' (Migratory Bird Conservation Act); and (2) ``for (a) incidental... participate in interpretive programs in the indoor and outdoor classrooms. The Refuge provides habitat for...

  14. 77 FR 24403 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    .../Infectious Waste Incinerators'' (HMIWI). The Illinois Environmental Protection Agency (IEPA) submitted the... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0087; FRL-9663-4] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  15. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  16. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  17. 76 FR 67369 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... the California State Implementation Plan, Joaquin Valley Unified Air Pollution Control District and Imperial County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution...

  18. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration Final Management Plan and... Administration (NOAA), Department of Commerce (DOC). ACTION: Notice of public availability. SUMMARY: NOAA is... the wreck of the famed Civil War ironclad, USS Monitor, best known for its battle with the Confederate...

  19. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  20. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  1. 40 CFR 62.14770 - When must I achieve final compliance?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Air Curtain Incinerators That Burn 100 Percent Wood Wastes, Clean Lumber And/or Yard Waste § 62.14770 When must I achieve final compliance? If you plan to continue...

  2. Development of Operational Free-Space-Optical (FSO) Laser Communication Systems Final Report CRADA No. TC02093.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruggiero, A.; Orgren, A.

    This project was a collaborative effort between Lawrence Livermore National Security, LLC (formerly The Regents of the University of California)/Lawrence Livermore National Laboratory (LLNL) and LGS Innovations, LLC (formerly Lucent Technologies, Inc.), to develop long-range and mobile operational free-space optical (FSO) laser communication systems for specialized government applications. LLNL and LGS Innovations formerly Lucent Bell Laboratories Government Communications Systems performed this work for a United States Government (USG) Intelligence Work for Others (I-WFO) customer, also referred to as "Government Customer", or "Customer" and "Government Sponsor." The CRADA was a critical and required part of the LLNL technology transfer plan formore » the customer.« less

  3. Development of Live-working Robot for Power Transmission Lines

    NASA Astrophysics Data System (ADS)

    Yan, Yu; Liu, Xiaqing; Ren, Chengxian; Li, Jinliang; Li, Hui

    2017-07-01

    Dream-I, the first reconfigurable live-working robot for power transmission lines successfully developed in China, has the functions of autonomous walking on lines and accurately positioning. This paper firstly described operation task and object of the robot; then designed a general platform, an insulator replacement end and a drainage plate bolt fastening end of the robot, presented a control system of the robot, and performed simulation analysis on operation plan of the robot; and finally completed electrical field withstand voltage tests in a high voltage hall as well as online test and trial on actual lines. Experimental results show that by replacing ends of manipulators, the robot can fulfill operation tasks of live replacement of suspension insulators and live drainage plate bolt fastening.

  4. Methane Hydrate Field Program: Development of a Scientific Plan for a Methane Hydrate-Focused Marine Drilling, Logging and Coring Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Myers, Greg

    This final report document summarizes the activities undertaken and the output from three primary deliverables generated during this project. This fifteen month effort comprised numerous key steps including the creation of an international methane hydrate science team, determining and reporting the current state of marine methane hydrate research, convening an international workshop to collect the ideas needed to write a comprehensive Marine Methane Hydrate Field Research Plan and the development and publication of that plan. The following documents represent the primary deliverables of this project and are discussed in summary level detail in this final report: Historical Methane Hydrate Projectmore » Review Report; Methane Hydrate Workshop Report; Topical Report: Marine Methane Hydrate Field Research Plan; and Final Scientific/Technical Report.« less

  5. [Electoral demography. The demographic dimension of a political process].

    PubMed

    Herrero, J M

    1991-01-01

    A complete and reliable knowledge of the potential voters is indispensable for holding elections in a democratic society. In 1990 a new Federal Code of Electoral Institutions and Procedures (COFIRE) was approved in Mexico. A new list of potential voters was to be created based on the 1990 census and without reference to the old list. The planning and implementation of the 1991 electoral rolls required great efficiency in order to complete the work in time for elections, while assuring its validity and legitimacy through a clear and participatory process in which all political parties played a permanent role. COFIRE designated July 1991 as the date for completion, allowing just 10 months for the entire process from planning to completion. The 1991 work represented a political process as much as a technical challenge. A working group from the political parties provided advice on all aspects of the work, from defining the social communications campaign to cartographic review and organization of field work. Although the list potential voters not intended for demographic purposes, its validity, coverage, and variety of information make it a rich source of sociodemographic information. An estimated 95% of individuals included in the 1990 census were included in the lists of prospective voters. Of these, 39,500,000 citizens, or 86% of the census population, actually registered as of the deadline on May 31. The final coverage by states varied from a low of 79.3% in Guerrero to a high of 91.0% in the Federal District.

  6. Patient Protection and Affordable Care Act; health insurance market rules. Final rule.

    PubMed

    2013-02-27

    This final rule implements provisions related to fair health insurance premiums, guaranteed availability, guaranteed renewability, single risk pools, and catastrophic plans, consistent with title I of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010, referred to collectively as the Affordable Care Act. The final rule clarifies the approach used to enforce the applicable requirements of the Affordable Care Act with respect to health insurance issuers and group health plans that are non-federal governmental plans. This final rule also amends the standards for health insurance issuers and states regarding reporting, utilization, and collection of data under the federal rate review program, and revises the timeline for states to propose state-specific thresholds for review and approval by the Centers for Medicare & Medicaid Services (CMS).

  7. Wake-Sleep Cycle Management during SUSOPS and CONOPS in French Military Forces: Policy and Ethics

    DTIC Science & Technology

    2009-10-01

    sleepiness for 48 hours. Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on...Finally, Z- hypnotics are also allowed to promote pre- planned sleep episodes. Nevertheless, the use of these drugs acting on the central nervous system...why the individual test of tolerance, planned in the MD instruction, seems to be particularly important for modafinil before operational use. 3.2

  8. Pretest information for a test to validate plume simulation procedures (FA-17)

    NASA Technical Reports Server (NTRS)

    Hair, L. M.

    1978-01-01

    The results of an effort to plan a final verification wind tunnel test to validate the recommended correlation parameters and application techniques were presented. The test planning effort was complete except for test site finalization and the associated coordination. Two suitable test sites were identified. Desired test conditions were shown. Subsequent sections of this report present the selected model and test site, instrumentation of this model, planned test operations, and some concluding remarks.

  9. Health, Environment and Social Management in Enterprises programme in the Republic of Macedonia.

    PubMed

    Karadzinska-Bislimovska, Jovanka; Baranski, Boguslaw; Risteska-Kuc, Snezana

    2004-01-01

    Macedonia is the first country in the region to launch implementation of the WHO Health, Environment and Social Management in Enterprises (HESME) Programme, following the WHO Ministerial Conference on Environment and Health held in London in 1999. The aim of this paper is to describe the efforts made to implement this programme. Methods are based on integrated management with joint involvement of crucial partners at all levels of activities suggested by the WHO. Commitment to inter-sectorial and interagency collaboration at national level, adoption of a final version of a National HESME Plan, with basic principles, criteria and concrete activities, establishment of a National coordination center for the HESME Project, development of training curricula and specific educational tools for occupational health personnel, preparation of questionnaires and procedures for a national survey to detect high occupational risks, specific occupational hazards and health promotion needs of the working population, and finally setting up quantitative and qualitative indicators for national or provincial workplace health profiles. Building up the concept of cooperation, partnership and common work in HESME activities is a challenge for the new public health view in Europe.

  10. A Qualitative Study on Factors that Influence Turkish Medical Students' Decisions to Become Family Physicians After the Health Transformation Programme.

    PubMed

    Tanriover, Ozlem; Hidiroglu, Seyhan; Akan, Hulya; Ay, Pinar; Erdogan, Yalcin; Karavus, Melda; Vitrinel, Ayca; Hayran, Osman

    2014-06-01

    In Turkey, general practitioners were authorized to work as family physicians without specialization, within the scope of the Health Transformation Programme, due to inadequate number of family medicine specialists since 2004. With this new implementation Family Medicine specialty became a less preferable option for medical students. The study was to investigate the perspectives of medical students and understand the issues to choose Family Medicine specialty as a career option. This qualitative study was performed with 48 final year medical students using a convenience sample from two medical universities. Three main categories emerged from the data viewing Family Medicine 'as a specialty', 'as an employment', and finally 'as a system'. Very few students stated that Family Medicine would be their choice for specialty. Family Medicine does not seem to be an attractive option in career planning by medical students. Several factors that may constrain students from choosing Family Medicine include: not perceiving Family Medicine as a field of expertise, and the adverse conditions at work which may originate from duality in the system.

  11. Fossil Energy Planning for Navajo Nation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Acedo, Margarita

    This project includes fossil energy transition planning to find optimal solutions that benefit the Navajo Nation and stakeholders. The majority of the tribe’s budget currently comes from fossil energy-revenue. The purpose of this work is to assess potential alternative energy resources including solar photovoltaics and biomass (microalgae for either biofuel or food consumption). This includes evaluating carbon-based reserves related to the tribe’s resources including CO 2 emissions for the Four Corners generating station. The methodology for this analysis will consist of data collection from publicly available data, utilizing expertise from national laboratories and academics, and evaluating economic, health, and environmentalmore » impacts. Finally, this report will highlight areas of opportunities to implement renewable energy in the Navajo Nation by presenting the technology requirements, cost, and considerations to energy, water, and environment in an educational structure.« less

  12. Human Factors and Ergonomics for the Dental Profession.

    PubMed

    Ross, Al

    2016-09-01

    This paper proposes that the science of Human Factors and Ergonomics (HFE) is suitable for wide application in dental education, training and practice to improve safety, quality and efficiency. Three areas of interest are highlighted. First it is proposed that individual and team Non-Technical Skills (NTS), such as communication, leadership and stress management can improve error rates and efficiency of procedures. Secondly, in a physically and technically challenging environment, staff can benefit from ergonomic principles which examine design in supporting safe work. Finally, examination of organizational human factors can help anticipate stressors and plan for flexible responses to multiple, variable demands, and fluctuating resources. Clinical relevance: HFE is an evidence-based approach to reducing error rates and procedural complications, and avoiding problems associated with stress and fatigue. Improved teamwork and organizational planning and efficiency can impact directly on patient outcomes.

  13. Phase I Investigations at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, in 2010-2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LaFreniere, Lorraine M.

    This report presents the technical findings of Phase I of Argonne’s studies. The Phase I field investigation was initiated on October 18, 2010. The work was conducted in accord with (1) the final site-specific Phase I Work Plan for Montgomery City (Argonne 2010; approved by the MDNR [2010]); (2) applicable Missouri regulations; and (3) the standard operating procedures, quality assurance/quality control (QA/QC) measures, and general health and safety policies outlined in the Master Work Plan (Argonne 2002) for operations in Kansas, which was reviewed by the MDNR and accepted for current use. A draft master plan specific to work inmore » Missouri and a set of draft standard operating procedures are in review with the MDNR. The site-specific Work Plan for Montgomery City (Argonne 2010) (1) summarizes the pre-existing knowledge base for the Montgomery City investigation site compiled by Argonne and (2) describes the site-specific technical objectives and the intended scope of work developed for the first phase of the investigation. Three primary technical objectives were identified for the Phase I studies, as follows: 1. Update the presently identified inventory and status of private and public drinking water wells in the immediate vicinity of the former CCC/USDA grain storage facility, and sample the identified wells for volatile organic compounds (VOCs) and geochemical analyses. In conjunction with this effort, determine the present sources(s) of drinking water for all residents in an approximate 0.5-mi radius of the former CCC/USDA facility. 2. Investigate for possible evidence of a soil source of carbon tetrachloride contamination in the unconsolidated sediments beneath the former CCC/USDA facility that might affect the underlying bedrock aquifer units. 3. Obtain preliminary information on the site-specific lithologic and hydrologic characteristics of the unconsolidated sediments overlying bedrock at the former CCC/USDA grain storage location. Section 2 of this report describes the investigative methods used in the 2010-2011 studies and provides a chronological summary of the field events conducted. Section 3 presents a summary of the resulting field and laboratory data. These data, together with information presented in the site-specific Work Plan (Argonne 2010), are interpreted and integrated in Section 4 to (1) develop a preliminary conceptual model of the hydrogeologic framework affecting groundwater and potential contaminant migration in the vicinity of the former CCC/USDA facility and (2) serve as a basis for the initial consideration of contaminant levels and potential exposure pathways that might be of concern in the evaluation of risks to human health, public welfare, and the environment. The working conclusions drawn from the 2010-2011 studies are presented, along with recommendations, in Section 5.« less

  14. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  15. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  16. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  17. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  18. 7 CFR 1717.604 - Long-range engineering plans and construction work plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Long-range engineering plans and construction work... AND GUARANTEED ELECTRIC LOANS Operational Controls § 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and...

  19. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  20. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  1. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) A cyber security plan in accordance with the criteria set forth in § 73.54 of this chapter; (iv) A... cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan, shall protect the plans and...

  2. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  3. Effects of planning strategies on writing dynamics and final texts.

    PubMed

    Limpo, Teresa; Alves, Rui A

    2018-06-12

    Expert writing involves the interaction among three cognitively demanding processes: planning, translating, and revising. To manage the cognitive load brought on by these processes, writers frequently use strategies. Here, we examined the effects of planning strategies on writing dynamics and final texts. Before writing an argumentative text with the triple-task technique, 63 undergraduates were asked either to elaborate an outline with the argumentative structure embedded (structure-based planning condition), to provide a written list of ideas for the text (list-based planning condition), or to do a non-writing-related filler task (no planning condition). Planning showed no effects on the length of the pre-writing pause and cognitive effort, but influenced writing processes occurrences. Compared to participants in the no-planning condition, those in the planning conditions showed a later activation of revising. Moreover, participants in the structure-based condition were mainly focused on translating in the beginning and middle of composition, whereas their peers tended to distribute their attention among all processes. Planning ahead of writing also resulted in texts with longer words, produced at a higher rate. Only the structure-based planning strategy led to an increase in the number of argumentation elements as well as in essays' persuasiveness and overall quality. There was, however, no indication that these improvements in final texts were associated with changes in the dynamics of writing. Overall, the use of structure-based plans seems to be an effective and efficient way of improving undergraduates' argumentative writing. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. Minimum Value of Eligible Employer-Sponsored Plans and Other Rules Regarding the Health Insurance Premium Tax Credit. Final regulations.

    PubMed

    2015-12-18

    This document contains final regulations on the health insurance premium tax credit enacted by the Patient Protection and Affordable Care Act and the Health Care and Education Reconciliation Act of 2010, as amended by the Medicare and Medicaid Extenders Act of 2010, the Comprehensive 1099 Taxpayer Protection and Repayment of Exchange Subsidy Overpayments Act of 2011, and the Department of Defense and Full-Year Continuing Appropriations Act, 2011. These final regulations affect individuals who enroll in qualified health plans through Affordable Insurance Exchanges (Exchanges, sometimes called Marketplaces) and claim the health insurance premium tax credit, and Exchanges that make qualified health plans available to individuals and employers.

  5. Planning the Unplanned Experiment: Towards Assessing the Efficacy of Standards for Safety-Critical Software

    NASA Technical Reports Server (NTRS)

    Graydon, Patrick J.; Holloway, C. M.

    2015-01-01

    Safe use of software in safety-critical applications requires well-founded means of determining whether software is fit for such use. While software in industries such as aviation has a good safety record, little is known about whether standards for software in safety-critical applications 'work' (or even what that means). It is often (implicitly) argued that software is fit for safety-critical use because it conforms to an appropriate standard. Without knowing whether a standard works, such reliance is an experiment; without carefully collecting assessment data, that experiment is unplanned. To help plan the experiment, we organized a workshop to develop practical ideas for assessing software safety standards. In this paper, we relate and elaborate on the workshop discussion, which revealed subtle but important study design considerations and practical barriers to collecting appropriate historical data and recruiting appropriate experimental subjects. We discuss assessing standards as written and as applied, several candidate definitions for what it means for a standard to 'work,' and key assessment strategies and study techniques and the pros and cons of each. Finally, we conclude with thoughts about the kinds of research that will be required and how academia, industry, and regulators might collaborate to overcome the noted barriers.

  6. Impact of Cancer on Work and Education Among Adolescent and Young Adult Cancer Survivors

    PubMed Central

    Parsons, Helen M.; Harlan, Linda C.; Lynch, Charles F.; Hamilton, Ann S.; Wu, Xiao-Cheng; Kato, Ikuko; Schwartz, Stephen M.; Smith, Ashley W.; Keel, Gretchen; Keegan, Theresa H.M.

    2012-01-01

    Purpose To examine the impact of cancer on work and education in a sample of adolescent and young adult (AYA) patients with cancer. Patients and Methods By using the Adolescent and Young Adult Health Outcomes and Patient Experience Study (AYA HOPE)—a cohort of 463 recently diagnosed patients age 15 to 39 years with germ cell cancer, Hodgkin's lymphoma, non-Hodgkin's lymphoma, sarcoma, and acute lymphocytic leukemia from participating Surveillance, Epidemiology, and End Results (SEER) cancer registries—we evaluated factors associated with return to work/school after cancer diagnosis, a belief that cancer had a negative impact on plans for work/school, and reported problems with work/school after diagnosis by using descriptive statistics, χ2 tests, and multivariate logistic regression. Results More than 72% (282 of 388) of patients working or in school full-time before diagnosis had returned to full-time work or school 15 to 35 months postdiagnosis compared with 34% (14 of 41) of previously part-time workers/students, 7% (one of 14) of homemakers, and 25% (five of 20) of unemployed/disabled patients (P < .001). Among full-time workers/students before diagnosis, patients who were uninsured (odds ratio [OR], 0.21; 95% CI, 0.07 to 0.67; no insurance v employer-/school-sponsored insurance) or quit working directly after diagnosis (OR, 0.15; 95% CI, 0.06 to 0.37; quit v no change) were least likely to return. Very intensive cancer treatment and quitting work/school were associated with a belief that cancer negatively influenced plans for work/school. Finally, more than 50% of full-time workers/students reported problems with work/studies after diagnosis. Conclusion Although most AYA patients with cancer return to work after cancer, treatment intensity, not having insurance, and quitting work/school directly after diagnosis can influence work/educational outcomes. Future research should investigate underlying causes for these differences and best practices for effective transition of these cancer survivors to the workplace/school after treatment. PMID:22614977

  7. Photodynamic therapy in neurosurgery: a proof of concept of treatment planning system

    NASA Astrophysics Data System (ADS)

    Dupont, C.; Reyns, N.; Mordon, S.; Vermandel, M.

    2017-02-01

    Glioblastoma (GBM) is the most common primary brain tumor. PhotoDynamic Therapy (PDT) appears as an interesting research field to improve GBM treatment. Nevertheless, PDT cannot fit into the current therapeutic modalities according to several reasons: the lack of reliable and reproducible therapy schemes (devices, light delivery system), the lack of consensus on a photosensitizer and the absence of randomized and controlled multicenter clinical trial. The main objective of this study is to bring a common support for PDT planning. Here, we describe a proof of concept of Treatment Planning System (TPS) dedicated to interstitial PDT for GBM treatment. The TPS was developed with the integrated development environment C++ Builder XE8 and the environment ArtiMED, developed in our laboratory. This software enables stereotactic registration of DICOM images, light sources insertion and an accelerated CUDA GPU dosimetry modeling. Although, Monte-Carlo is more robust to describe light diffusion in biological tissue, analytical model accelerated by GPU remains relevant for dose preview or fast reverse planning processes. Finally, this preliminary work proposes a new tool to plan interstitial or intraoperative PDT treatment and might be included in the design of future clinical trials in order to deliver PDT straightforwardly and homogenously in investigator centers.

  8. Vulnerability-based evaluation of water supply design under climate change

    NASA Astrophysics Data System (ADS)

    Umit Taner, Mehmet; Ray, Patrick; Brown, Casey

    2015-04-01

    Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).

  9. Least-cost transportation planning in ODOT : phase 2 final report.

    DOT National Transportation Integrated Search

    1996-06-01

    This project is intended to suggest ways in which least-cost planning principles could be incorporated into the transportation planning process. The Mt. Hood corridor was chosen for examination. The examination of the planning process highlighted sev...

  10. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  11. 20 CFR 632.22 - Modification of a Comprehensive Annual Plan (CAP) and/or Master Plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... (CAP) and/or Master Plan. 632.22 Section 632.22 Employees' Benefits EMPLOYMENT AND TRAINING... Master Plan. (a) The requirements for modifying a Master Plan and/or CAP will be included in administrative instructions issued by the Grant Officer upon final implementation of the Master Plan/CAP system...

  12. Climate change effects on international stability : a white paper.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Murphy, Kathryn; Taylor, Mark A.; Fujii, Joy

    2004-12-01

    This white paper represents a summary of work intended to lay the foundation for development of a climatological/agent model of climate-induced conflict. The paper combines several loosely-coupled efforts and is the final report for a four-month late-start Laboratory Directed Research and Development (LDRD) project funded by the Advanced Concepts Group (ACG). The project involved contributions by many participants having diverse areas of expertise, with the common goal of learning how to tie together the physical and human causes and consequences of climate change. We performed a review of relevant literature on conflict arising from environmental scarcity. Rather than simply reviewingmore » the previous work, we actively collected data from the referenced sources, reproduced some of the work, and explored alternative models. We used the unfolding crisis in Darfur (western Sudan) as a case study of conflict related to or triggered by climate change, and as an exercise for developing a preliminary concept map. We also outlined a plan for implementing agents in a climate model and defined a logical progression toward the ultimate goal of running both types of models simultaneously in a two-way feedback mode, where the behavior of agents influences the climate and climate change affects the agents. Finally, we offer some ''lessons learned'' in attempting to keep a diverse and geographically dispersed group working together by using Web-based collaborative tools.« less

  13. Planning for Disaster.

    ERIC Educational Resources Information Center

    Lewis, Steven

    1996-01-01

    Disaster recovery planning need not be expensive nor complete to be effective. Systematic planning involves several crucial steps, including outlining the final plan, understanding the nature of a disaster's effects and the stages of disaster recovery, prioritizing appropriately, and learning how to test the plan in a practical way for the…

  14. Regional Haze Plan for Texas and Oklahoma

    EPA Pesticide Factsheets

    EPA partially approved and partially disapproved the Texas regional haze plan. EPA also finalized a plan to limit sulfur dioxide emissions from eight Texas coal-fired electricity generating facilities

  15. Interactive Webmap-Based Science Planning for BepiColombo

    NASA Astrophysics Data System (ADS)

    McAuliffe, J.; Martinez, S.; Ortiz de Landaluce, I.; de la Fuente, S.

    2015-10-01

    For BepiColombo, ESA's Mission to Mercury, we will build a web-based, map-based interface to the Science Planning System. This interface will allow the mission's science teams to visually define targets for observations and interactively specify what operations will make up the given observation. This will be a radical departure from previous ESA mission planning methods. Such an interface will rely heavily on GIS technologies. This interface will provide footprint coverage of all existing archived data for Mercury, including a set of built-in basemaps. This will allow the science teams to analyse their planned observations and operational constraints with relevant contextual information from their own instrument, other BepiColombo instruments or from previous missions. The interface will allow users to import and export data in commonly used GIS formats, such that it can be visualised together with the latest planning information (e.g. import custom basemaps) or analysed in other GIS software. The interface will work with an object-oriented concept of an observation that will be a key characteristic of the overall BepiColombo scienceplanning concept. Observation templates or classes will be tracked right through the planning-executionprocessing- archiving cycle to the final archived science products. By using an interface that synthesises all relevant available information, the science teams will have a better understanding of the operational environment; it will enhance their ability to plan efficiently minimising or removing manual planning. Interactive 3D visualisation of the planned, scheduled and executed observations, simulation of the viewing conditions and interactive modification of the observation parameters are also being considered.

  16. Encoding and choice in the task span paradigm.

    PubMed

    Reiman, Kaitlin M; Weaver, Starla M; Arrington, Catherine M

    2015-03-01

    Cognitive control during sequences of planned behaviors requires both plan-level processes such as generating, maintaining, and monitoring the plan, as well as task-level processes such as selecting, establishing and implementing specific task sets. The task span paradigm (Logan in J Exp Psychol Gen 133:218-236, 2004) combines two common cognitive control paradigms, task switching and working memory span, to investigate the integration of plan-level and task-level processes during control of sequential behavior. The current study expands past task span research to include measures of encoding processes and choice behavior with volitional sequence generation, using the standard task span as well as a novel voluntary task span paradigm. In two experiments, we consider how sequence complexity, defined separately for plan-level and task-level complexity, influences sequence encoding (Experiment 1), sequence choice (Experiment 2), sequence memory, and task performance of planned sequences of action. Results indicate that participants were sensitive to sequence complexity, but that different aspects of behavior are most strongly influenced by different types of complexity. Hierarchical complexity at the plan level best predicts voluntary sequence generation and memory; while switch frequency at the task level best predicts encoding of externally defined sequences and task performance. Furthermore, performance RTs were similar for externally and internally defined plans, whereas memory was improved for internally defined sequences. Finally, participants demonstrated a significant sequence choice bias in the voluntary task span. Consistent with past research on choice behavior, volitional selection of plans was markedly influenced by both the ease of memory and performance.

  17. Role of Pharmacy Residency Training in Career Planning: A Student's Perspective.

    PubMed

    McElhaney, Ashley; Weber, Robert J

    2014-12-01

    Pharmacy students typically become more focused on career planning and assessment in the final year of their PharmD training. Weighing career options in the advanced pharmacy practice experience year can be both exciting and stressful. The goal of this article is to provide a primer on how pharmacy students can assess how a residency can fit into career planning. This article will describe the various career paths available to graduating students, highlight ways in which a residency can complement career choices, review the current state of the job market for pharmacists, discuss the current and future plans for residency programs, and present thoughts from some current and former residents on why they chose to complete a residency. Most career paths require some additional training, and a residency provides appropriate experience very quickly compared to on-the-job training. Alternative plans to residency training must also be considered, as there are not enough residency positions for candidates. Directors of pharmacy must consider several factors when giving career advice on pharmacy residency training to pharmacy students; they should provide the students with an honest assessment of their work skills and their abilities to successfully complete a residency. This assessment will help the students to set a plan for improvement and give them a better chance at being matched to a pharmacy residency.

  18. Role of Pharmacy Residency Training in Career Planning: A Student’s Perspective

    PubMed Central

    McElhaney, Ashley; Weber, Robert J.

    2014-01-01

    Pharmacy students typically become more focused on career planning and assessment in the final year of their PharmD training. Weighing career options in the advanced pharmacy practice experience year can be both exciting and stressful. The goal of this article is to provide a primer on how pharmacy students can assess how a residency can fit into career planning. This article will describe the various career paths available to graduating students, highlight ways in which a residency can complement career choices, review the current state of the job market for pharmacists, discuss the current and future plans for residency programs, and present thoughts from some current and former residents on why they chose to complete a residency. Most career paths require some additional training, and a residency provides appropriate experience very quickly compared to on-the-job training. Alternative plans to residency training must also be considered, as there are not enough residency positions for candidates. Directors of pharmacy must consider several factors when giving career advice on pharmacy residency training to pharmacy students; they should provide the students with an honest assessment of their work skills and their abilities to successfully complete a residency. This assessment will help the students to set a plan for improvement and give them a better chance at being matched to a pharmacy residency. PMID:25673897

  19. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...; State of California; PM-10; Determination of Attainment for the Coso Junction Nonattainment Area... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing its determination that the Coso Junction... Officer, GBUAPCD, to Doris Lo, Environmental Protection Specialist, EPA, with CosoJunction2010--MetAndTEOM...

  20. 77 FR 24483 - Wausau Paper Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Mills, LLC; Notice of Final Land Management Plan and Soliciting Comments, Motions To Intervene, and...: Wausau Paper Mills, LLC. e. Name of Project: Rhinelander Hydroelectric Project. f. Location: The upper.... Applicant Contact: Mr. Tim Hasbargen, Wausau Paper Mills, LLC, 515 Davenport St., Rhinelander, Wisconsin...

  1. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  2. Medical loss ratio rebate requirements for non-federal governmental plans. Interim final rule with request for comments.

    PubMed

    2011-12-07

    This interim final rule with comment period revises the regulations implementing medical loss ratio (MLR) requirements for health insurance issuers under the Public Health Service Act in order to establish rules governing the distribution of rebates by issuers in group markets for non-Federal governmental plans.

  3. 77 FR 64734 - Approval and Promulgation of Implementation Plans; North Dakota: Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Permitting Authority and Tailoring Rule; PM 2.5 NSR Implementation Rule AGENCY: Environmental Protection... Implementation Plan (SIP) relating to regulation of Greenhouse Gases (GHGs) and fine particulate matter (PM 2.5... Tailoring Final Rule'' and the final rule for ``Implementation of the New Source Review (NSR) Program for PM...

  4. 78 FR 34402 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ...-FF03E15000] Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement, Ni... Environmental Impact Statement (FEIS) associated with an application received from NiSource Inc. (hereafter ``Ni... Endangered Species Act of 1973, as amended (ESA). If issued, the ITP would authorize NiSource to take 10...

  5. 76 FR 52690 - Final Environmental Impact Statement on Nabesna Off-Road Vehicle Management Plan, Wrangell-St...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ...-Road Vehicle Management Plan, Wrangell-St. Elias National Park and Preserve AGENCY: National Park... a Final Environmental Impact Statement (FEIS) on Off-Road Vehicle Management in the Nabesna District... preferred alternative and four action alternatives for management of off-road vehicles in the Nabesna...

  6. 75 FR 21342 - Notice of Availability of the Final Environmental Impact Statement for the Mona to Oquirrh...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Corridor Project, Utah, and the Proposed Pony Express Resource Management Plan Amendment AGENCY: Bureau of...)/Proposed Resource Management Plan Amendment (RMPA) for the Mona to Oquirrh Transmission Corridor Project... Final EIS/Proposed RMPA for the Mona to Oquirrh Transmission Corridor Project have been sent to affected...

  7. 77 FR 24405 - Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... Incinerators'' (HMIWI). The Indiana Department of Environmental Management (IDEM) submitted the revised State... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 62 [EPA-R05-OAR-2012-0086; FRL-9663-2] Direct Final Approval of Hospital/Medical/Infectious Waste Incinerators State Plan for Designated Facilities and...

  8. An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information (Final Report)

    EPA Science Inventory

    EPA announced the availability of the final report, An Assessment of Decision-Making Processes: Evaluation of Where Land Protection Planning Can Incorporate Climate Change Information. This report is a review of decision-making processes of selected land protection prog...

  9. National Primary and Secondary Ambient Air Quality Standards (NAAQS) for Lead (Pb) and Implementation Plans for Lead NAAQS: 1978 Final Rule (43 FR 46246 & 46264)

    EPA Pesticide Factsheets

    This document is a copy of the Federal Register publication of the October 5, 1978 Final Rules for National Primary and Secondary Ambient Air Quality Standards for Lead (Pb) and Implementation Plans for Lead (Pb) NAAQS.

  10. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. OVERVIEW AND APPLICATION. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  11. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 4: ANALYTICAL GUIDE. INTERIM FINAL - DECEMBER 2003

    EPA Science Inventory

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  12. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation New Melones Lake Area Resource Management Plan...) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS... Dan Holsapple, Acting New Melones Resource Manager, Bureau of Reclamation, at 209-536- 9094...

  13. 77 FR 76515 - Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAK930000.L13100000.DS0000] Notice of Availability of the National Petroleum Reserve-Alaska Final Integrated Activity Plan/Environmental Impact... of Land Management (BLM), Alaska State Office, is issuing the National Petroleum Reserve in Alaska...

  14. 75 FR 44977 - General Management Plan/Abbreviated Final Environmental Impact Statement, Roosevelt-Vanderbilt...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... Impact Statement for the General Management Plan (GMP/EIS) for Roosevelt-Vanderbilt National Historic Sites, Hyde Park, New York. The Abbreviated Final GMP/EIS includes an analysis of agency and public comments received on the Draft GMP/EIS with NPS responses, errata sheets detailing editorial corrections to...

  15. 40 CFR 62.14565 - How do I comply with the increment of progress for achieving final compliance?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DESIGNATED FACILITIES AND POLLUTANTS Federal Plan Requirements for Commercial and Industrial Solid Waste Incineration Units That Commenced Construction On or Before November 30, 1999 Compliance Schedule and... complete retrofit construction of control devices, as specified in the final control plan, so that, when...

  16. 78 FR 12347 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-22

    ... Historic trails. The four alternatives were: Alternative A: Continues existing management practices (no... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLWYR05000 L16100000.DQ0000 LXSS04 K0000] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement...

  17. SU-E-T-129: Are Knowledge-Based Planning Dose Estimates Valid for Distensible Organs?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lalonde, R; Heron, D; Huq, M

    2015-06-15

    Purpose: Knowledge-based planning programs have become available to assist treatment planning in radiation therapy. Such programs can be used to generate estimated DVHs and planning constraints for organs at risk (OARs), based upon a model generated from previous plans. These estimates are based upon the planning CT scan. However, for distensible OARs like the bladder and rectum, daily variations in volume may make the dose estimates invalid. The purpose of this study is to determine whether knowledge-based DVH dose estimates may be valid for distensible OARs. Methods: The Varian RapidPlan™ knowledge-based planning module was used to generate OAR dose estimatesmore » and planning objectives for 10 prostate cases previously planned with VMAT, and final plans were calculated for each. Five weekly setup CBCT scans of each patient were then downloaded and contoured (assuming no change in size and shape of the target volume), and rectum and bladder DVHs were recalculated for each scan. Dose volumes were then compared at 75, 60,and 40 Gy for the bladder and rectum between the planning scan and the CBCTs. Results: Plan doses and estimates matched well at all dose points., Volumes of the rectum and bladder varied widely between planning CT and the CBCTs, ranging from 0.46 to 2.42 for the bladder and 0.71 to 2.18 for the rectum, causing relative dose volumes to vary between planning CT and CBCT, but absolute dose volumes were more consistent. The overall ratio of CBCT/plan dose volumes was 1.02 ±0.27 for rectum and 0.98 ±0.20 for bladder in these patients. Conclusion: Knowledge-based planning dose volume estimates for distensible OARs are still valid, in absolute volume terms, between treatment planning scans and CBCT’s taken during daily treatment. Further analysis of the data is being undertaken to determine how differences depend upon rectum and bladder filling state. This work has been supported by Varian Medical Systems.« less

  18. AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-04-01

    The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less

  19. FY16 Strategic Themes White Paper.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    The Science and Technology (S&T) Division 1000 Strategic Plan includes the Themes, Goals, and Actions for FY16. S&T will continue to support the Labs Strategic plan, Mission Areas and Program Management Units by focusing on four strategic themes that align with the targeted needs of the Labs. The themes presented in this plan are Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Collectively they emphasize diverse, collaborative teams and a self-reliant culture of safety that will deliver on our promise of exceptional service in the national interest like never before. Mission Engagement focuses on increasing collaboration at allmore » levels but with emphasis at the strategic level with mission efforts across the labs. Bold Outcomes seeks to increase the ability to take thoughtful risks with the goal of achieving transformative breakthroughs more frequently. Collaborative environment strives for a self-aware, collaborative working environment that bridges the many cultures of Sandia. Finally, Safety Imperative aims to minimize the risk of serious injury and to continuously strengthen the safety culture. Each of these themes is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16 and leading into FY17.« less

  20. Improved Test Planning and Analysis Through the Use of Advanced Statistical Methods

    NASA Technical Reports Server (NTRS)

    Green, Lawrence L.; Maxwell, Katherine A.; Glass, David E.; Vaughn, Wallace L.; Barger, Weston; Cook, Mylan

    2016-01-01

    The goal of this work is, through computational simulations, to provide statistically-based evidence to convince the testing community that a distributed testing approach is superior to a clustered testing approach for most situations. For clustered testing, numerous, repeated test points are acquired at a limited number of test conditions. For distributed testing, only one or a few test points are requested at many different conditions. The statistical techniques of Analysis of Variance (ANOVA), Design of Experiments (DOE) and Response Surface Methods (RSM) are applied to enable distributed test planning, data analysis and test augmentation. The D-Optimal class of DOE is used to plan an optimally efficient single- and multi-factor test. The resulting simulated test data are analyzed via ANOVA and a parametric model is constructed using RSM. Finally, ANOVA can be used to plan a second round of testing to augment the existing data set with new data points. The use of these techniques is demonstrated through several illustrative examples. To date, many thousands of comparisons have been performed and the results strongly support the conclusion that the distributed testing approach outperforms the clustered testing approach.

  1. Design and evaluation of a software prototype for participatory planning of environmental adaptations.

    PubMed

    Eriksson, J; Ek, A; Johansson, G

    2000-03-01

    A software prototype to support the planning process for adapting home and work environments for people with physical disabilities was designed and later evaluated. The prototype exploits low-cost three-dimensional (3-D) graphics products in the home computer market. The essential features of the prototype are: interactive rendering with optional hardware acceleration, interactive walk-throughs, direct manipulation tools for moving objects and measuring distances, and import of 3-D-objects from a library. A usability study was conducted, consisting of two test sessions (three weeks apart) and a final interview. The prototype was then tested and evaluated by representatives of future users: five occupational therapist students, and four persons with physical disability, with no previous experience of the prototype. Emphasis in the usability study was placed on the prototype's efficiency and learnability. We found that it is possible to realise a planning tool for environmental adaptations, both regarding usability and technical efficiency. The usability evaluation confirms our findings from previous case studies, regarding the relevance and positive attitude towards this kind of planning tool. Although the prototype was found to be satisfactorily efficient for the basic tasks, the paper presents several suggestions for improvement of future prototype versions.

  2. Psychotherapeutic and work-oriented interventions: employment outcomes among young adults with work disability due to a mental disorder.

    PubMed

    Mattila-Holappa, Pauliina; Joensuu, Matti; Ahola, Kirsi; Koskinen, Aki; Tuisku, Katinka; Ervasti, Jenni; Virtanen, Marianna

    2016-01-01

    We examined the extent to which psychotherapeutic and work-oriented interventions were included in a medical treatment and rehabilitation plan and whether they predicted future employment among young adults with work disability due to a mental disorder. Data were obtained from the treatment and rehabilitation plans of 1163 young adults aged 18‒34 years, who in 2008 were granted fixed-term work disability compensation due to a mental disorder and were followed for 5 years. Forty-six percent had no proposal for psychotherapy or a work-oriented intervention in their treatment and rehabilitation plan, 22 % had a plan for only a psychotherapeutic intervention, 23 % had a plan for only a work-oriented intervention, and 10 % had both types of interventions planned. Having a planned psychotherapeutic intervention (HR = 1.35, 95 % CI 1.07-1.69) and of the work-oriented interventions, planned rehabilitative courses and training (HR = 1.34, 95 % CI 1.03-1.70) predicted quicker entry into competitive employment. Having a plan for both a psychotherapeutic and work-oriented intervention was associated with being employed at the end of the follow-up (OR = 1.77, 95 % CI 1.07-2.95). Young adults with a long-term psychiatric work disability episode rarely have a recorded plan for rehabilitation in their treatment and rehabilitation plan although psychotherapeutic interventions and a combination of a psychotherapeutic and work-oriented intervention might help them gain employment.

  3. Beam commissioning and measurements validating the beam model in a new TPS that converts helical tomotherapy plans to step-and-shoot IMRT plans.

    PubMed

    Petersson, Kristoffer; Ceberg, Crister; Engström, Per; Knöös, Tommy

    2011-01-01

    A new type of treatment planning system called SHAREPLAN has been studied, which enables the transfer of treatment plans generated for helical tomotherapy delivery to plans that can be delivered on C-arm linacs. The purpose is to ensure continuous patient treatment during periods of unscheduled downtime for the TomoTherapy unit, particularly in clinics without a backup unit. The purpose of this work was to verify that the plans generated in this novel planning system are deliverable and accurate. The work consists primarily of beam commissioning, verification of the beam model, and measurements verifying that generated plans are deliverable with sufficient accuracy. The beam commissioning process involves input of general geometric properties of the modeled linac, profiles and depth dose curves for a specific photon nominal energy (6 MV), and the automated modeling of other beam properties. Some manual tuning of the beam model is required. To evaluate its accuracy, the confidence limit concept [J. Venselaar et al., "Tolerances for the accuracy of photon beam dose calculations of treatment planning systems," Radiother. Oncol. 60, 191-201 (2001)] was used, which is a method supported by ESTRO. Measurements were conducted with a 2D diode array at the commissioned linac as a final check of the beam model and to evaluate whether the generated plans were deliverable and accurate. The comparison and evaluation of calculated data points and measured data according to the method applied confirmed the accuracy of the beam model. The profiles had a confidence limit of 1.1% and the depth dose curves had a confidence limit of 1.7%, both of which were well below the tolerance limit of 2%. Plan specific QC measurements and evaluation verified that different plans generated in the TPS were deliverable with sufficient accuracy at the commissioned linac, as none of the 160 beams for the 20 different plans evaluated had a fraction of approved data points below 90%, the local clinical approval criterion for delivery QA measurements. This study is a validation of the new TPS as it verifies that the generated plans are deliverable at a commissioned linac with adequate accuracy. A thorough investigation of the treatment plan quality will require a separate study. The TPS is proving to be a useful and time-saving complement, especially for clinics having a single unit for helical delivery among its conventional linacs.

  4. McClellan AFB, California, RI/FS Quality Assurance Project Plan. Installation Restoration Program (IRP) Stage 3.

    DTIC Science & Technology

    1992-08-07

    AD-A5 6 ... 1... . .. .. .... INSTALLATION RESTORATION PROGRAM (IRP) STAGE 3 7m~ QUALITY ASSURANCE -k- PROJECT PLAN for McCLELLAN AFB , CALIFORNIA...FINAL.. S AUG 2. 1 1992 L PREPARED FOR: .... ... McCLELLAN AFB IEM McCLELLAN AFB , CALIFORNIA 9652-599 ................... fr pu licrele se...PLAN FINAL ’’ : " FOR McCLELLAN AFB /EM McCLELLAN AFB , CALIFORNIA 95652-5990 August 1992 AUG 2 11992 PREPARED BY: DI Radian Corporation10389 Old

  5. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  6. Large Synoptic Survey Telescope mount final design

    NASA Astrophysics Data System (ADS)

    Callahan, Shawn; Gressler, William; Thomas, Sandrine J.; Gessner, Chuck; Warner, Mike; Barr, Jeff; Lotz, Paul J.; Schumacher, German; Wiecha, Oliver; Angeli, George; Andrew, John; Claver, Chuck; Schoening, Bill; Sebag, Jacques; Krabbendam, Victor; Neill, Doug; Hileman, Ed; Muller, Gary; Araujo, Constanza; Orden Martinez, Alfredo; Perezagua Aguado, Manuel; García-Marchena, Luis; Ruiz de Argandoña, Ismael; Romero, Francisco M.; Rodríguez, Ricardo; Carlos González, José; Venturini, Marco

    2016-08-01

    This paper describes the status and details of the large synoptic survey telescope1,2,3 mount assembly (TMA). On June 9th, 2014 the contract for the design and build of the large synoptic survey telescope mount assembly (TMA) was awarded to GHESA Ingeniería y Tecnología, S.A. and Asturfeito, S.A. The design successfully passed the preliminary design review on October 2, 2015 and the final design review January 29, 2016. This paper describes the detailed design by subsystem, analytical model results, preparations being taken to complete the fabrication, and the transportation and installation plans to install the mount on Cerro Pachón in Chile. This large project is the culmination of work by many people and the authors would like to thank everyone that has contributed to the success of this project.

  7. 7 CFR 23.13 - Plan of Work.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... multi-State organizations or bodies for those activities of the Regional Rural Development Centers which... of the Secretary of Agriculture STATE AND REGIONAL ANNUAL PLANS OF WORK Regional Program § 23.13 Plan of Work. (a) A Regional Plan of Work for carrying out the programs authorized to be funded under...

  8. 77 FR 47373 - Fiscal Year 2012 Draft Work Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... DENALI COMMISSION Fiscal Year 2012 Draft Work Plan; Correction AGENCY: Denali Commission. ACTION... Federal Register of May 23, 2012, concerning request for comments on the Draft Work Plan for Federal Fiscal Year 2012. This revision to Fiscal Year 2012 Work Plan is to provide clarifying edits. In...

  9. 7 CFR 1710.209 - Approval requirements for load forecast work plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cooperate in the preparation of and submittal of the load forecast work plan of their power supply borrower. (b) An approved load forecast work plan establishes the process for the preparation and maintenance... approved load forecast work plan must outline the coordination and preparation requirements for both the...

  10. Nevada State plan; final approval determination. Occupational Safety and Health Administration (OSHA), U.S. Department of Labor. Final State plan approval--Nevada.

    PubMed

    2000-04-18

    This document amends OSHA's regulations to reflect the Assistant Secretary's decision granting final approval to the Nevada State plan. As a result of this affirmative determination under section 18(e) of the Occupational Safety and Health Act of 1970, Federal OSHA's standards and enforcement authority no longer apply to occupational safety and health issues covered by the Nevada plan, and authority for Federal concurrent jurisdiction is relinquished. Federal enforcement jurisdiction is retained over any private sector maritime employment, private sector employers on Indian land, and any contractors or subcontractors on any Federal establishment where the land is exclusive Federal jurisdiction. Federal jurisdiction remains in effect with respect to Federal government employers and employees. Federal OSHA will also retain authority for coverage of the United States Postal Service (USPS), including USPS employees, contract employees, and contractor-operated facilities engaged in USPS mail operations.

  11. Intelligent transportation systems business plan for Kentucky : final report.

    DOT National Transportation Integrated Search

    2001-09-01

    This report presents a Business Plan for Intelligent Transportation Systems (ITS) in Kentucky. The purpose of the Business Plan is to define ITS projects that are planned for implementation from 2002 through 2007. The list of projects contained withi...

  12. 78 FR 28775 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...

  13. Time management tips, tricks, and exercises for busy medical practice employees.

    PubMed

    Hills, Laura

    2012-01-01

    Working in a busy medical practice requires excellent time management skills and an ability to handle those unanticipated emergencies, urgencies, and monkey-wrenches that can and often do throw a well-planned day out of whack. This article offers busy medical practice employees 50 time management tips to help them manage their time well. It focuses specifically on eliminating time wasters, working more efficiently, and developing personal goals and habits that can increase productivity, reduce stress, and make working in the practice more enjoyable. This article also offers several hands-on time management exercises, including a time management self-assessment quiz, a multitasking exercise, and a time drain exercise. These can be completed individually or collaboratively with other members of the medical practice team. Finally, this article explores 12 popular time management myths and how a medical practice employee can increase his or her productivity by identifying and harnessing his or her productivity "happy hour(s)".

  14. Landowner Attitudes and Perceptions of Impact from Wind and Natural Gas Development in Northern Pennsylvania: Implications for Energy Landscapes in Rural America

    NASA Astrophysics Data System (ADS)

    Jacquet, Jeffrey Bryan

    Energy developments such as industrial scale wind farms and unconventional natural gas drilling represent some of the largest and most controversial land use changes occurring in the United States today. A diverse array of academic disciplines have each sought to explain the social, psychological, and economic effects of siting large industrial facilities in rural areas, however the research has largely remained discipline-specific. This study measures resident attitudes and perceptions of impact from both wind and gas drilling occurring simultaneously in the Armenia Mountain Area of northern Pennsylvania. The results of a mail survey of landowners (n = 1028) in this study area reveal factors that explain landowner variation in attitudes and perception of impact, and describe new forms of participation in the planning and siting of these energy projects. Direction is provided for a new and synthetic theoretical understanding of how residents perceive these impacts and impacts from land use change. The work advances “risk of social and psychological disruption” as a key factor that may influence how residents respond to the prospect of large land use changes. Implications for the regulation and planning of these energy sources are offered, including a new understanding of how landowners participate in the planning and siting of large energy projects. Finally, the limitations of this work, as well as opportunities and implications for future research, are discussed.

  15. Plans and Considerations for the Exploration of Space

    NASA Technical Reports Server (NTRS)

    Derkowski, Brian J.

    2001-01-01

    The Mars Settlement Design Competition is a program for high school students and teachers to experience the process of mission and hardware design. It provides a top level view into how NASA plans to explore space. I will be involved with all three days of this competition. On Friday I plan to give two presentations, one to the employees of White Sands Test Facility and one to students and teachers. On Saturday, I will have a question and answer session with some of the teachers participating in the workshop. Sunday I will serve as one of the judges that will review the students projects created over the weekend. The main emphasis of my talk will focus on exploring the possibilities of the future of space exploration. I will discuss the Mars Reference Mission 3.0, as well as some of the current robotic missions being sent to Mars. Next, I will present a business model perfected by Hum Mandell, showing how the public, private, and commercial sectors all play a major role in sending humans to Mars. I will also discuss the work of the Integrated Design Team at JSC and how that working together approach is key for a successful design. Finally, I will present that the question of how humans can reach out beyond low earth orbit and place permanent settlements on Mars is really a function of the imagination of those who intend on going there.

  16. Systematic development of a communication skills training course for physicians performing work disability assessments: from evidence to practice

    PubMed Central

    2011-01-01

    Background Physicians require specific communication skills, because the face-to-face contact with their patients is an important source of information. Although physicians who perform work disability assessments attend some communication-related training courses during their professional education, no specialised and evidence-based communication skills training course is available for them. Therefore, the objectives of this study were: 1) to systematically develop a training course aimed at improving the communication skills of physicians during work disability assessment interviews with disability claimants, and 2) to plan an evaluation of the training course. Methods A physician-tailored communication skills training course was developed, according to the six steps of the Intervention Mapping protocol. Data were collected from questionnaire studies among physicians and claimants, a focus group study among physicians, a systematic review of the literature, and meetings with various experts. Determinants and performance objectives were formulated. A concept version of the training course was discussed with several experts before the final training course programme was established. The evaluation plan was developed by consulting experts, social insurance physicians, researchers, and policy-makers, and discussing with them the options for evaluation. Results A two-day post-graduate communication skills training course was developed, aimed at improving professional communication during work disability assessment interviews. Special focus was on active teaching strategies, such as practising the skills in role-play. An adoption and implementation plan was formulated, in which the infrastructure of the educational department of the institute that employs the physicians was utilised. Improvement in the skills and knowledge of the physicians who will participate in the training course will be evaluated in a randomised controlled trial. Conclusions The feasibility and practical relevance of the communication skills training course that was developed seem promising. Such a course may be relevant for physicians in many countries who perform work disability assessments. The development of the first training course of this type represents an important advancement in this field. PMID:21639871

  17. Systematic development of a communication skills training course for physicians performing work disability assessments: from evidence to practice.

    PubMed

    van Rijssen, H Jolanda; Schellart, Antonius J M; Anema, Johannes R; de Boer, Wout E L; van der Beek, Allard J

    2011-06-03

    Physicians require specific communication skills, because the face-to-face contact with their patients is an important source of information. Although physicians who perform work disability assessments attend some communication-related training courses during their professional education, no specialised and evidence-based communication skills training course is available for them. Therefore, the objectives of this study were: 1) to systematically develop a training course aimed at improving the communication skills of physicians during work disability assessment interviews with disability claimants, and 2) to plan an evaluation of the training course. A physician-tailored communication skills training course was developed, according to the six steps of the Intervention Mapping protocol. Data were collected from questionnaire studies among physicians and claimants, a focus group study among physicians, a systematic review of the literature, and meetings with various experts. Determinants and performance objectives were formulated. A concept version of the training course was discussed with several experts before the final training course programme was established. The evaluation plan was developed by consulting experts, social insurance physicians, researchers, and policy-makers, and discussing with them the options for evaluation. A two-day post-graduate communication skills training course was developed, aimed at improving professional communication during work disability assessment interviews. Special focus was on active teaching strategies, such as practising the skills in role-play. An adoption and implementation plan was formulated, in which the infrastructure of the educational department of the institute that employs the physicians was utilised. Improvement in the skills and knowledge of the physicians who will participate in the training course will be evaluated in a randomised controlled trial. The feasibility and practical relevance of the communication skills training course that was developed seem promising. Such a course may be relevant for physicians in many countries who perform work disability assessments. The development of the first training course of this type represents an important advancement in this field.

  18. Who will be the Radiologists of Tomorrow? A survey of radiology during the "Practical Year" in Germany.

    PubMed

    Dettmer, Sabine; Fischer, Volkhard; Paeßens, Carolin; Meyer, Simone; Wacker, Frank K; Rodt, Thomas

    2017-10-01

    Purpose  Aim of our study was to evaluate the motivation of medical students in their final year of medical school to choose radiology for further specialization by means of a Germany-wide survey. Materials and Methods  The survey was performed during the 2015/16 semester among German medical students in their four months radiology elective during the final year. Invitations for the study were distributed by the Student Secretariats of each university. The survey was web-based with EvaSys 7.0 software. Questions on radiology contents during medical studies and "practical year" were part of the survey. Plans for residency and possible advantages and disadvantages of radiology as medical specialty were inquired. Descriptive statistics and group comparisons were used as analysis methods. Results  89 students participated in the survey at the beginning and 60 students at the end of the practical year. Of these 39 students could be identified who answered both questionnaires. Most students were satisfied with their final year radiology elective (mean 1.8 on a range from 1 to 5). Nevertheless, they criticized mentoring during routine work (mean 2.1) and a lack of educational courses (mean 2.1). Most students (83 %) were uncertain about their residency choice at the beginning of their "practical year" and about one fifth changed their plans. From the students' point of view main advantages of radiology included contact with many other clinical disciplines (87 %) and the working conditions (68 %). The reduced patient contact (42 %), the large amount of work at a computer (43 %), and the dependency on referring physicians (42 %) were regarded as the main disadvantages. The students regarded the way radiology is taught during the studies as not practical enough. With regard to radiology the majority of students (63 %) felt poorly prepared for their future work. Conclusion  The "practical year" is important regarding the choice of future specialization. There was a high degree of satisfaction with the "practical year" in radiology. The mentoring during routine work and a lack of educational courses was mildly criticized. These factors provide room for improvement to foster students' interest in radiology. Key Points   · The "practical year" is important regarding the choice of further specialization.. · Criticisms of radiology in the "practical year" were mentoring and courses.. · Students feel poorly prepared for their future work regarding practical radiological skills.. Citation Format · Dettmer S, Fischer V, Paeßens C et al. Who will be the Radiologists of Tomorrow? A survey of radiology during the "Practical Year" in Germany. Fortschr Röntgenstr 2017; 189: 967 - 976. © Georg Thieme Verlag KG Stuttgart · New York.

  19. A gEUD-based inverse planning technique for HDR prostate brachytherapy: Feasibility study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giantsoudi, D.; Department of Radiation Oncology, Francis H. Burr Proton Therapy Center, Boston, Massachusetts 02114; Baltas, D.

    2013-04-15

    Purpose: The purpose of this work was to study the feasibility of a new inverse planning technique based on the generalized equivalent uniform dose for image-guided high dose rate (HDR) prostate cancer brachytherapy in comparison to conventional dose-volume based optimization. Methods: The quality of 12 clinical HDR brachytherapy implants for prostate utilizing HIPO (Hybrid Inverse Planning Optimization) is compared with alternative plans, which were produced through inverse planning using the generalized equivalent uniform dose (gEUD). All the common dose-volume indices for the prostate and the organs at risk were considered together with radiobiological measures. The clinical effectiveness of the differentmore » dose distributions was investigated by comparing dose volume histogram and gEUD evaluators. Results: Our results demonstrate the feasibility of gEUD-based inverse planning in HDR brachytherapy implants for prostate. A statistically significant decrease in D{sub 10} or/and final gEUD values for the organs at risk (urethra, bladder, and rectum) was found while improving dose homogeneity or dose conformity of the target volume. Conclusions: Following the promising results of gEUD-based optimization in intensity modulated radiation therapy treatment optimization, as reported in the literature, the implementation of a similar model in HDR brachytherapy treatment plan optimization is suggested by this study. The potential of improved sparing of organs at risk was shown for various gEUD-based optimization parameter protocols, which indicates the ability of this method to adapt to the user's preferences.« less

  20. Resource management and operations in central North Dakota: Climate change scenario planning workshop summary November 12-13, 2015, Bismarck, ND

    USGS Publications Warehouse

    Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika

    2016-01-01

    The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.

Top