Sample records for fire control facility

  1. 77 FR 49830 - Notice of Lodging of Proposed Amendment to the Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... control particulate matter emissions at its Huntingdon, Pennsylvania facility (``the Huntingdon facility'') by either shutting down coal-fired boilers, installing air emission controls on the existing unit, or converting the coal-fired boilers to natural gas-fired boilers by June 30, 2012. The Commonwealth did not...

  2. Research Summary Multipollutant Control Research Facility (MPCRF)

    EPA Science Inventory

    The U.S. Environmental Protection Agency’s (EPA) Multipollutant Control Research Facility (MPCRF) is located at their Research Triangle Park, North Carolina, campus. The MPCRF combustor is a pulverized coal-, natural gas-, and biomass-fired furnace with a maximum firing rate of 4...

  3. Inadequate Contract Oversight of Military Construction Projects in Afghanistan Resulted in Increased Hazards to Life and Safety of Coalition Forces

    DTIC Science & Technology

    2013-03-08

    applicable fire protection standards for two of the three projects we reviewed that required a fire sprinkler system . Specifically, the Secure...RSOI and Command and Control facilities do not have fire sprinkler systems as required by Unified Facilities Criteria 3-600-01, Section 4-2.2...stated that, as such, those facilities did not need fire sprinkler systems . Based on the justification provided by the Air Force on the DD Form 1391s

  4. 77. Deputy commander's launch control console, fire control panel missing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    77. Deputy commander's launch control console, fire control panel missing at right, south side - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  5. Unified Facilities Criteria (UFC) Design: Fire Protection Engineering for Facilities

    DTIC Science & Technology

    2003-08-20

    following provisions: • Ceiling sprinkler design area must be increased by 10 percent. ESFR sprinklers must increase the required number to be...Control System ESFR Early Suppression Fast-Response Sprinklers ETL Engineering Technical Letters FAAA Fire Administration Authorization Act FM

  6. 42 CFR 403.744 - Condition of participation: Life safety from fire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written fire control plans that contain provisions for prompt reporting of fires; extinguishing fires...) The RNHCI must maintain written evidence of regular inspection and approval by State or local fire... contrary, the RNHCI may place alcohol-based hand rub dispensers in its facility if— (i) Use of alcohol...

  7. 76 FR 1192 - Notice of Lodging of Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ..., the Commonwealth will control particulate matter emissions at the facilities by either shutting down coal-fired boilers, installing air emission controls, or converting the coal-fired boilers to natural gas-fired boilers. The Commonwealth will pay a civil penalty of $300,000 for past violations. The...

  8. 1. Photographic copy of fire alarm plan for Control and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of fire alarm plan for Control and Recording Center Building 4221/E-22, showing layout of rooms. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Edwards Test Station, Fire Alarm Plan, Bldg. E-22,' drawing no. EFA/11-1, December 15, 1961. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  9. Recommendations related to Browns Ferry Fire

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-02-01

    Based on its review of the events transpiring before, during and after the Browns Ferry fire, the Review Group concludes that the probability of disruptive fires of the magnitude of the Browns Ferry event is small, and that there is no need to restrict operation of nuclear power plants for public safety. However, it is clear that much can and should be done to reduce even further the likelihood of disabling fires and to improve assurance of rapid extinguishment of fires that occur. Consideration should be given also to features that would increase further the ability of nuclear facilities tomore » withstand large fires without loss of important functions should such fires occur. The Review Group believes that improvements, especially in the areas of fire prevention and fire control, can and should be made in most existing facilities.« less

  10. THE EFFECTS OF COMPUTER-BASED FIRE SAFETY TRAINING ON THE KNOWLEDGE, ATTITUDES, AND PRACTICES OF CAREGIVERS

    PubMed Central

    Harrington, Susan S.; Walker, Bonnie L.

    2010-01-01

    Background Older adults in small residential board and care facilities are at a particularly high risk of fire death and injury because of their characteristics and environment. Methods The authors investigated computer-based instruction as a way to teach fire emergency planning to owners, operators, and staff of small residential board and care facilities. Participants (N = 59) were randomly assigned to a treatment or control group. Results Study participants who completed the training significantly improved their scores from pre- to posttest when compared to a control group. Participants indicated on the course evaluation that the computers were easy to use for training (97%) and that they would like to use computers for future training courses (97%). Conclusions This study demonstrates the potential for using interactive computer-based training as a viable alternative to instructor-led training to meet the fire safety training needs of owners, operators, and staff of small board and care facilities for the elderly. PMID:19263929

  11. PBF Control Building auxiliary features, including fire hose house and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building auxiliary features, including fire hose house and sewage system. Ebasco Services 1205 PER/PER-A-4. INEEL undex no. 760-0619-00-205-123024 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  12. 76 FR 70352 - Approval and Promulgation of Implementation Plans; Reasonably Available Control Technology for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... controlling oxides of nitrogen from the stationary reciprocating, diesel fuel fired, internal combustion... County. The facility contains two stationary reciprocating, diesel fuel fired, internal combustion... Conditions of Approval specify the NO X emissions limits, combustion process adjustments mentioned above...

  13. A User's Guide for the Spacecraft Fire Safety Facility

    NASA Technical Reports Server (NTRS)

    Goldmeer, Jeffrey S.

    2000-01-01

    The Spacecraft Fire Safety Facility (SFSF) is a test facility that can be flown on NASA's reduced gravity aircraft to perform various types of combustion experiments under a variety of experimental conditions. To date, this facility has flown numerous times on the aircraft and has been used to perform experiments ranging from an examination of the effects transient depressurization on combustion, to ignition and flame spread. A list of pubfications/presentations based on experiments performed in the SFSF is included in the reference section. This facility consists of five main subsystems: combustion chamber, sample holders, gas flow system, imaging system, and the data acquisition/control system. Each of these subsystems will be reviewed in more detail. These subsystems provide the experiment operator with the ability to monitor and/or control numerous experimental parameters.

  14. 10. Helicopter pad, fire extinguisher at center, looking southwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Helicopter pad, fire extinguisher at center, looking southwest - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  15. KSC-06pd1204

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  16. LA-UR-14-27684, Analysis of Wildland Fire Hazard to the TWF at Los Alamos National Labs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbertson, Sarah

    Wildfires represent an Anticipated Natural Phenomena Hazard for LANL and the surrounding area. The TWF facility is located in a cleared area and is surrounded on three sides by roadway pavement. Therefore, direct propagation of flames to the facility is not considered the most credible means of ignition. Rather, fires started by airborne transport of burning brands constitute the most significant wildland fire threat to the TWF. The purpose of this document is to update LA-UR-13-24529, Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities, to be specific to the TWF site and operations.

  17. Fire safety concerns in space operations

    NASA Technical Reports Server (NTRS)

    Friedman, Robert

    1987-01-01

    This paper reviews the state-of-the-art in fire control techniques and identifies important issues for continuing research, technology, and standards. For the future permanent orbiting facility, the space station, fire prevention and control calls for not only more stringent fire safety due to the long-term and complex missions, but also for simplified and flexible safety rules to accommodate the variety of users. Future research must address a better understanding of the microgravity space environment as it influences fire propagation and extinction and the application of the technology of fire detection, extinguishment, and material assessment. Spacecraft fire safety should also consider the adaptation of methods and concepts derived from aircraft and undersea experience.

  18. KSC-2013-1073

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  19. KSC-2013-1074

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  20. KSC-2013-1077

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  1. KSC-2013-1078

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  2. KSC-2013-1075

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  3. KSC-2013-1076

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  4. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4160... noncombustible materials with equivalent fire protection characteristics. ...

  5. Fire protection review revisit no. 2, Argonne National Laboratory, Argonne, Illinois

    NASA Astrophysics Data System (ADS)

    Dobson, P. H.; Earley, M. W.; Mattern, L. J.

    1985-05-01

    A fire protection survey was conducted at Argonne National Laboratory on April 1-5, 8-12, and April 29-May 2, 1985. The purpose was to review the facility fire protection program and to make recommendations or identify areas according to criteria established by the Department of Energy. There has been a substantial improvement in fire protection at this laboratory since the 1977 audit. Numerous areas which were previously provided with detection systems only have since been provided with automatic sprinkler protection. The following basic fire protection features are not properly controlled: (1) resealing wall and floor penetrations between fire areas after installation of services; (2) cutting and welding; and (3) housekeeping. The present Fire Department manpower level appears adequate to control a route fire. Their ability to adequately handle a high-challenge fire, or one involving injuries to personnel, or fire spread beyond the initial fire area is doubtful.

  6. Test results: Halon 1301 versus water sprinkler fire protection for essential electronic equipment

    NASA Astrophysics Data System (ADS)

    Reichelt, E. F.; Walker, J. L.; Vickers, R. N.; Kwan, A. J.

    1982-07-01

    This report describes results of testing two contending extinguishants, Halon 1301 and water, for fire protection of essential electronic equipment. A series of controlled fires in a facility housing an operational electronic data processing system sought to establish immediate and long term effects of exposure of sensitive electronic equipment and stored data to fire extinguishment atmospheres. Test results lead to the conclusion that Halon 1301 is superior to water as an extinguishant for fires occurring in essential electronic equipment installations.

  7. Chemical Safety Alert: Fire Hazard from Carbon Adsorption Deodorizing Systems

    EPA Pesticide Factsheets

    Activated carbon systems used to adsorb vapors for odor control may pose a fire hazard when used for certain types of substances, such as crude sulfate turpentine. Facilities should take precautions and proper procedures to avoid or mitigate these hazards.

  8. KSC-2013-3235

    NASA Image and Video Library

    2013-08-09

    CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 4 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room was the most advanced of the control rooms used for shuttle missions and was the primary firing room for the shuttle's final series of launches before retirement. It is furnished in a more contemporary style with wood cabinets and other features, although it retains many of the computer systems the shuttle counted on to operate safely. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang

  9. Remote monitoring of a Fire Protection System

    NASA Astrophysics Data System (ADS)

    Bauman, Steven; Vermeulen, Tom; Roberts, Larry; Matsushige, Grant; Gajadhar, Sarah; Taroma, Ralph; Elizares, Casey; Arruda, Tyson; Potter, Sharon; Hoffman, James

    2011-03-01

    Some years ago CFHT proposed developing a Remote Observing Environment aimed at producing Science Observations at their Observatory Facility on Mauna Kea from their Headquarters facility in Waimea, HI. This Remote Observing Project commonly referred to as OAP (Observatory Automation Project) was completed at the end of January 2011 and has been providing the majority of Science Data since. My poster will discuss the upgrades to the existing fire alarm protection system. With no one at the summit during nightly operations, the observatory facility required automated monitoring of the facility for safety to personnel and equipment in the case of a fire. An addressable analog fire panel was installed which utilizes digital communication protocol (DCP), intelligent communication with other devices, and an RS-232 interface which provides feedback and real-time monitoring of the system. Using the interface capabilities of the panel, it provides notifications when heat detectors, smoke sensors, manual pull stations, or the main observatory computer room fire suppression system has been activated. The notifications are sent out as alerts to staff in the form of test massages and emails and the observing control GUI interface alerts the remote telescope operator with a map showing the location of the fire occurrence and type of device that has been triggered. And all of this was accomplished without the need for an outside vendor to monitor the system and facilitate warnings or notifications regarding the system.

  10. Influence of weather factors on moisture content of light fuels in forests of the northern Rocky Mountains

    Treesearch

    George M. Jemison

    1935-01-01

    The necessity of forest-fire protection is generally recognized in the United Slates. The tremendous damage done by forest fires each year to valuable timber, watershed cover, forest range, wildlife, recreational facilities, and personal property has impressed upon the people the need for preventing and controlling forest fires so far as this is humanly possible.

  11. Health and environmental effects of refuse derived fuel (RDF) production and RDF/coal co-firing technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Toole, J.J.; Wessels, T.E.; Lynch, J.F.

    1981-10-01

    Six facilities, representing the scope of different co-firing techniques with their associated RDF production systems were reviewed in detail for combustion equipment, firing modes, emission control systems, residue handling/disposal, and effluent wastewater treatment. These facilities encompass all currently operational or soon to be operational co-firing plants and associated RDF production systems. Occupational health and safety risks for these plants were evaluated on the basis of fatal and nonfatal accidents and disease arising from the respective fuel cycles, coal and RDF. Occupational risks include exposure to pathogenic organisms in the workplace. Unusual events that are life threatening in the RDF processingmore » industry (e.g., explosions) are also discussed and remedial and safety measures reviewed. 80 refs., 4 figs., 30 tabs.« less

  12. Fire Fighter Trainer Environmental Considerations

    DTIC Science & Technology

    1981-01-08

    established by the Environmental Protection Agency and various state and local ordinances. At present, the Navy’s fire fighter train- ing facilities use...necessary. All operational capabilities for military communications equipment have been retained. Each training compartment has a local communications...the state or local air pollution-control agencies on a case-by-case basis. 4.2.4 Japanese Air Pollution-Control Regulations. The Japanese Air Quality

  13. Compliance with Electrical and Fire Protection Standards of U.S. Controlled and Occupied Facilities in Afghanistan

    DTIC Science & Technology

    2013-07-18

    are subject to damage and abrasion (figure 5). The use of an extension cord instead of fixed wiring creates the possibility of fire , electrical shock...Medical Clinic has an adjacent warehouse that is of a higher hazard and is not separated by 1-hour fire resistance rated construction. KMC 17-May...higher hazard and is not separated by 1-hour fire resistance rated construction. DynCorp NO Awaiting USG Decision DI has not received governmental

  14. Fire Safety in Nursing Facilities: Participant's Coursebook.

    ERIC Educational Resources Information Center

    Walker (Bonnie) and Associates, Inc., Crofton, MD.

    Fewer people die in nursing facility fires than in fires occurring in other places where older people live. Fire remains, however, a significant threat in nursing facilities. This book is centered around six "modules" that present a fire safety training program for managers and staff in nursing homes. These modules present the following…

  15. 49 CFR 193.2905 - Protective enclosures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... stations; (7) Control systems; (8) Fire control equipment; (9) Security communications systems; and (10... not be located near features outside of the facility, such as trees, poles, or buildings, which could...

  16. Use of automatic door closers improves fire safety.

    PubMed

    Waterman, T E

    1979-01-01

    In a series of 16 full-scale fire tests, investigators at the IIT Research Institute have concluded that automatic door control in the room of fire origin can significantly reduce the spread of toxic smoke and gases. The researchers also investigated the effects of sprinkler actuation, and the functional relationship between sprinklers and automatic door closers. This report presents the results of the study, and presents recommendations for health-care facilities.

  17. Fire Hazard Assessment in Supporting Fire Protection System Design of a Chemical Process Facility

    DTIC Science & Technology

    1996-08-01

    CSDP/Studies/FireHaz –i– 3/28/97 FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY Ali Pezeshk...Joseph Chang, Dwight Hunt, and Peter Jahn Parsons Infrastructure & Technology Group, Inc. Pasadena, California 91124 ABSTRACT Because fires in a chemical ...Assessment in Supporting Fire Protection System Design of a Chemical Process Facility 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6

  18. Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Kay L.; Ramsden, Margo M.; Gonzales, John E.

    To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. The hazard presented by liquid fuels, such as gasoline and diesel, results from the spillage of these liquids and subsequent ignitionmore » of vapors, causing a fire or explosion. Facilities that maintain liquid-fueled vehicles and implement appropriate safety measures are protected with ventilation systems designed to capture liquid fuel vapors at or near floor level. To minimize the potential for ignition in the event of a spill, receptacles, electrical fixtures, and hot-work operations, such as welding, are located outside of these areas. Compressed natural gas (CNG) is composed of methane with slight amounts of heavier simple hydrocarbons. Maintenance facilities that maintain CNG vehicles indoors must be protected against fire and explosion. However, the means of ensuring safety are different from those employed for liquid fuels because of the gaseous nature of methane and the fact that it is lighter than air. Because CNG is lighter than air, a release will rise to the ceiling of the maintenance facility and quickly dissipate rather than remaining at or near floor level like liquid fuel vapors. Although some of the means of protection for CNG vehicle maintenance facilities are similar to those used for liquid-fueled vehicles (ventilation and elimination of ignition sources), the types and placement of the protection equipment are different because of the behavior of the different fuels. The nature of gaseous methane may also require additional safeguards, such as combustible gas detectors and control systems, or specialized space heating, which are not needed in facilities servicing liquid-fuel vehicles. This handbook covers maintenance facilities that service CNG-fueled vehicles. Although similar requirements are mandated for liquefied natural gas (LNG) or liquefied petroleum gas (LPG) fueled vehicles, LNG and LPG are not covered in this handbook.« less

  19. Fire safety of ground-based space facilities on the spaceport ;Vostochny;

    NASA Astrophysics Data System (ADS)

    Artamonov, Vladimir S.; Gordienko, Denis M.; Melikhov, Anatoly S.

    2017-06-01

    The facilities of the spaceport ;Vostochny; and the innovative technologies for fire safety to be implemented are considered. The planned approaches and prospects for fire safety ensuring at the facilities of the spaceport ;Vostochny; are presented herein, based on the study of emergency situations having resulted in fire accidents and explosion cases at the facilities supporting space vehicles operation.

  20. [Considering the current state of fire safety in Taiwan's care environment from the perspective of the nation's worst recent hospital fire].

    PubMed

    Tseng, Wei-Wen; Shih, Chung-Liang; Chien, Shen-Wen

    2013-04-01

    Taiwan's worst hospital fire in history on October 23rd, 2012 at Sinying Hospital's Bei-Men Branch resulted in 13 elderly patient deaths and over 70 injuries. The heavy casualties were due in part to the serious condition of patients. Some patients on life-support machines were unable to move or be moved. This disaster highlights the issue of fire safety in small-scale hospitals that have transformed existing hospital space into special care environments for elderly patients. Compared with medical centers and general hospitals, these small-scale health facilities are ill equipped to deal properly with fire safety management and emergency response issues due to inadequate fire protection facilities, fire safety equipment, and human resources. Small-scale facilities that offer health care and medical services to mostly immobile patients face fire risks that differ significantly from general health care facilities. This paper focuses on fire risks in small-scale facilities and suggests a strategy for fire prevention and emergency response procedures, including countermeasures for fire risk assessment, management, and emergency response, in order to improve fire safety at these institutions in Taiwan.

  1. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  2. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  3. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  4. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  5. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  6. Environmental Assessment for the NASA First Response Facility

    NASA Technical Reports Server (NTRS)

    Kennedy, Carolyn

    2003-01-01

    NASA intends to construct a First Response Facility for integrated emergency response and health management. This facility will consolidate the Stennis Space Center fire department, medical clinic, security operations, emergency operations and the energy management and control center. The alternative considered is the "No Action Alternative". The proposed action will correct existing operational weaknesses and enhance capabilities to respond to medical emergencies and mitigate any other possible threats. Environmental impacts include are emissions, wetlands disturbance, solid waste generation, and storm water control.

  7. Locomotor effects of a low-frequency fire alarm on C57BL/6 male mice: a preliminary study.

    PubMed

    Povroznik, Jessica M; Faith, Robert E; Kessler, Matthew J; Ali, Frank N; Kosik, James; Prince, Stephen; Engler-Chiurazzi, Elizabeth B

    2017-12-01

    Maintaining appropriate acoustic conditions for animal welfare and data collection are crucial in biomedical research facilities. Negative impacts of disruptive sound are known and can include auditory damage, immune function changes, and behavioral alterations. One type of disruptive sound occurring in research facilities is that of fire alarms. To ameliorate this problem, many facilities have incorporated the use of low-frequency fire alarms that emit tones outside the rodent audible range. The impact of these devices has been assumed to be negligible. However, this has yet to be evaluated with controlled behavioral experiments. Thus, our objective was to investigate the impact of low-frequency fire alarm exposure on locomotor behavior in the open field, a test sensitive to acoustic stimuli disruption. Male mice were randomized to three alarm exposure groups (No-Alarm; Alarm-During; and Alarm-After) and placed in individual photobeam-activated locomotor chambers. The Alarm-During group displayed significantly reduced horizontal locomotion, with a trend towards reduced vertical locomotion. These data suggest that a low-frequency brief alarm tone can temporarily disrupt movement, a valuable insight should an alarm be deployed. Further, findings support close collaboration between researchers and institutional facility staff to ensure appropriate acoustic conditions are maintained, whenever possible, for research animals.

  8. The development and evaluation of water-mist fire extinguishing systems

    NASA Astrophysics Data System (ADS)

    Beason, D. G.; Staggs, K. J.

    1994-08-01

    Fire protection for underfloor space is primarily provided by Halon 1301 which has proven to be very effective. However, due to the link between halons and the possible depletion of the stratospheric ozone layer, plans have been implemented to eventually phase out Halon 1301 and 1211. In September 1987 the Montreal Protocol concerning chlorofluorocarbons (CFC) and halons was signed by the United States, the European Economic Community, and 23 other nations. The Montreal Protocol calls for freezing halon production at 1986 levels. Because the majority of underfloor fire protection at Lawrence Livermore National Laboratory (LLNL), as well as other Department of Energy (DOE) sites, is either Halon 1301 or sprinklers, some other means of suppression will have to be developed and verified. The potential loss to facilities housing computer or control rooms damaged by underfloor fires can be extreme. These losses would not only include hardware and software replacement costs, but also lost computing and control capability. Here at LLNL technical research in a facility could be severely affected. Recent studies conducted by the Fire Research Discipline of the Special Projects Division have shown that severe fires fueled by cable insulation can develop within as little as a 6-in-high underfloor space (even with mechanical ventilation shut off). Studies also show that conventional sprinklers may not be effective in preventing this destruction. Therefore, we are investigating the water-mist fire extinguishing system as an alternative to Halon 1301 and sprinklers.

  9. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false With what accident and fire prevention standards must Federal facilities comply? 102-74.355 Section 102-74.355 Public...

  10. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  11. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  12. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under Table 149.409 of this part, each helicopter fueling facility must have a fire protection...

  13. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under Table 149.409 of this part, each helicopter fueling facility must have a fire protection...

  14. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  15. Development of fire test methods for airplane interior materials

    NASA Technical Reports Server (NTRS)

    Tustin, E. A.

    1978-01-01

    Fire tests were conducted in a 737 airplane fuselage at NASA-JSC to characterize jet fuel fires in open steel pans (simulating post-crash fire sources and a ruptured airplane fuselage) and to characterize fires in some common combustibles (simulating in-flight fire sources). Design post-crash and in-flight fire source selections were based on these data. Large panels of airplane interior materials were exposed to closely-controlled large scale heating simulations of the two design fire sources in a Boeing fire test facility utilizing a surplused 707 fuselage section. Small samples of the same airplane materials were tested by several laboratory fire test methods. Large scale and laboratory scale data were examined for correlative factors. Published data for dangerous hazard levels in a fire environment were used as the basis for developing a method to select the most desirable material where trade-offs in heat, smoke and gaseous toxicant evolution must be considered.

  16. KSC-2013-3234

    NASA Image and Video Library

    2013-08-09

    CAPE CANAVERAL, Fla. – As seen on Google Maps, Firing Room 3 inside the Launch Control Center at NASA's Kennedy Space Center was one of the four control rooms used by NASA and contractor launch teams to oversee a space shuttle countdown. This firing room is furnished in the classic style with the same metal computer cabinets and some of the same monitors in place when the first shuttle mission launched April 12, 1981. Specialized operators worked at consoles tailored to keep track of the status of shuttle systems while the spacecraft was processed in the Orbiter Processing Facility, being stacked inside the Vehicle Assembly Building and standing at the launch pad before liftoff. The firing rooms, including 3, were also used during NASA's Apollo Program. Google precisely mapped the space center and some of its historical facilities for the company's map page. The work allows Internet users to see inside buildings at Kennedy as they were used during the space shuttle era. Photo credit: Google/Wendy Wang

  17. DoD Is Not Properly Monitoring the Initiation of Maintenance for Facilities at Kandahar Airfield, Afghanistan (REDACTED)

    DTIC Science & Technology

    2013-09-30

    fire sprinkler system during the initial construction of the RSOI facilities. The construction contract to build the RSOI...International Building Code. Compliant manual and automatic fire alarm and notification systems , portable fire extinguishers, fire sprinkler systems ...automatic fire sprinkler system that was not operational, a fire department connection that was obstructed, and a fire detection system

  18. ARC-2006-ACD06-0177-010

    NASA Image and Video Library

    2006-10-10

    CEV (Crew Escape Vehicle) capsule Balistic Range testing to examine static and dynamic stability characteristics (at the Hypervelocity Free-Flight Facility) HFF Chuck Cornelison operating 'Firing' control pannel

  19. Performance of the Spacecraft Propulsion Research Facility During Altitude Firing Tests of the Delta 3 Upper Stage

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Dickens, Kevin W.; Skaff, Tony F.; Cmar, Mark D.; VanMeter, Matthew J.; Haberbusch, Mark S.

    1998-01-01

    The Spacecraft Propulsion Research Facility at the NASA Lewis Research Center's Plum Brook Station was reactivated in order to conduct flight simulation ground tests of the Delta 3 cryogenic upper stage. The tests were a cooperative effort between The Boeing Company, Pratt and Whitney, and NASA. They included demonstration of tanking and detanking of liquid hydrogen, liquid oxygen and helium pressurant gas as well as 12 engine firings simulating first, second, and third burns at altitude conditions. A key to the success of these tests was the performance of the primary facility systems and their interfaces with the vehicle. These systems included the structural support of the vehicle, propellant supplies, data acquisition, facility control systems, and the altitude exhaust system. While the facility connections to the vehicle umbilical panel simulated the performance of the launch pad systems, additional purge and electrical connections were also required which were unique to ground testing of the vehicle. The altitude exhaust system permitted an approximate simulation of the boost-phase pressure profile by rapidly pumping the test chamber from 13 psia to 0.5 psia as well as maintaining altitude conditions during extended steady-state firings. The performance of the steam driven ejector exhaust system has been correlated with variations in cooling water temperature during these tests. This correlation and comparisons to limited data available from Centaur tests conducted in the facility from 1969-1971 provided insight into optimizing the operation of the exhaust system for future tests. Overall, the facility proved to be robust and flexible for vehicle space simulation engine firings and enabled all test objectives to be successfully completed within the planned schedule.

  20. Mercury emission trend influenced by stringent air pollutants regulation for coal-fired power plants in Korea

    NASA Astrophysics Data System (ADS)

    Pudasainee, Deepak; Kim, Jeong-Hun; Seo, Yong-Chil

    2009-12-01

    Regulatory control of mercury emission from anthropogenic sources has become a global concern in the recent past. Coal-fired power plants are one of the largest sources of anthropogenic mercury emission into the atmosphere. This paper summarizes the current reducing trend of mercury emission as co-beneficial effect by more stringent regulation changes to control primary air pollutants with introducing test results from the commercial coal-fired facilities and suggesting a guideline for future regulatory development in Korea. On average, mercury emission concentrations ranged 16.3-2.7 μg Sm -3, 2.4-1.1 μg Sm -3, 3.1-0.7 μg Sm -3 from anthracite coal-fired power plants equipped with electrostatic precipitator (ESP), bituminous coal-fired power plants with ESP + flue gas desulphurization (FGD) and bituminous coal-fired power plants with selective catalytic reactor (SCR) + cold side (CS) - ESP + wet FGD, respectively. Among the existing air pollution control devices, the best configuration for mercury removal in coal-fired power plants was SCR + CS - ESP + wet FGD, which were installed due to the stringent regulation changes to control primary air pollutants emission such as SO 2, NOx and dust. It was estimated that uncontrolled and controlled mercury emission from coal-fired power plants as 10.3 ton yr -1 and 3.2 ton yr -1 respectively. After the installation of ESP, FGD and SCR system, following the enforcement of the stringent regulation, 7.1 ton yr -1 of mercury emission has been reduced (nearly 69%) from coal-fired power plants as a co-benefit control. Based on the overall study, a sample guideline including emission limits were suggested which will be applied to develop a countermeasure for controlling mercury emission from coal-fired power plants.

  1. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  2. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  3. 36 CFR 1234.10 - What are the facility requirements for all records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the HVAC systems, fire alarm and fire protection systems. Manual switching between sources of service... elements are protected by a properly installed, properly maintained wet-pipe automatic sprinkler system, as... must provide documentation that the facility has a fire suppression system specifically designed to...

  4. 77 FR 70172 - Lifesaving and Fire-Fighting Equipment, Training and Drills Onboard Offshore Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Equipment, Training and Drills Onboard Offshore Facilities and Mobile Offshore Drilling Units (MODUs... lifesaving and fire-fighting equipment, training and drills on board offshore facilities and MODUs operating... guidance concerning lifesaving and fire-fighting equipment, training, and drills onboard manned offshore...

  5. 36 CFR § 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  6. Validation experiments to determine radiation partitioning of heat flux to an object in a fully turbulent fire.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ricks, Allen; Blanchat, Thomas K.; Jernigan, Dann A.

    2006-06-01

    It is necessary to improve understanding and develop validation data of the heat flux incident to an object located within the fire plume for the validation of SIERRA/ FUEGO/SYRINX fire and SIERRA/CALORE. One key aspect of the validation data sets is the determination of the relative contribution of the radiative and convective heat fluxes. To meet this objective, a cylindrical calorimeter with sufficient instrumentation to measure total and radiative heat flux had been designed and fabricated. This calorimeter will be tested both in the controlled radiative environment of the Penlight facility and in a fire environment in the FLAME/Radiant Heatmore » (FRH) facility. Validation experiments are specifically designed for direct comparison with the computational predictions. Making meaningful comparisons between the computational and experimental results requires careful characterization and control of the experimental features or parameters used as inputs into the computational model. Validation experiments must be designed to capture the essential physical phenomena, including all relevant initial and boundary conditions. A significant question of interest to modeling heat flux incident to an object in or near a fire is the contribution of the radiation and convection modes of heat transfer. The series of experiments documented in this test plan is designed to provide data on the radiation partitioning, defined as the fraction of the total heat flux that is due to radiation.« less

  7. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  8. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  9. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  10. Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, K.; Melendez, M.; Gonzales, J.

    To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. This handbook covers the primary elements that must be considered when developing a CNG vehicle maintenance facility design that will protectmore » against the ignition of natural gas releases. It also discusses specific protocols and training needed to ensure safety.« less

  11. Fire safety knowledge and practices among residents of an assisted living facility.

    PubMed

    Jaslow, David; Ufberg, Jacob; Yoon, Russell; McQueen, Clay; Zecher, Derek; Jakubowski, Greg

    2005-01-01

    Assisted living facilities (ALFs) pose unique fire risks to the elderly that may be linked to specific fire safety (FS) practices. To evaluate self-reported FS practices among ALF residents. All residents of a small ALF were surveyed regarding actual and hypothetical FS behaviors, self-perceived fire risk, and FS preparedness. Fifty-eight ALF residents completed the survey. Thirty-three (58%) individuals reported one or more disabilities. Seven (12%) residents ignored the fire alarm and 21 (35%) could not hear it clearly. Sixteen (28%) residents would attempt to locate the source of a fire rather than escape from the building. Only 24 (42%) residents were familiar with the building fire plan. Twenty-three (40%) people surveyed believed that they were not at risk of fire in the study facility. Residents of an ALF may be at increased fire injury risk due to their FS practices and disabilities.

  12. 30 CFR 56.4130 - Electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 56.4130 Electric substations...

  13. KSC-06pd1203

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  14. KSC-06pd1202

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  15. KSC-06pd1201

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  16. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.360 What are the specific accident and fire prevention responsibilities of occupant agencies...

  17. Manual for Public School Facilities: Fire Prevention and Fire Inspection.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Bureau of Educational Management Services.

    This manual is designed for use by New York public school administrators and facility inspectors, providing instruction for completing the state's Fire Safety Report. It provides background information and details about the State Fire Prevention and Building Code and regulations, and explains the inspection and enforcement processes. One-third of…

  18. 30 CFR 57.4130 - Surface electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4130 Surface electric...

  19. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palmer, E.

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  20. National Ignition Facility Control and Information System Operational Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, C D; Beeler, R G; Bowers, G A

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint themore » size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.« less

  1. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  2. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  3. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  4. 33 CFR 127.1507 - Water systems for fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Water systems for fire protection... HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Firefighting Equipment § 127.1507 Water systems for fire protection. (a) Each waterfront facility handling LHG must have a supply of water and a...

  5. Credit PSR. This interior view of the building equipment room ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit PSR. This interior view of the building equipment room displays heat exchangers and fan units with insulated piping for hot and cold water at left. Environmental controls and fire fighting system controls appear at right - Jet Propulsion Laboratory Edwards Facility, Propellant Curing Building, Edwards Air Force Base, Boron, Kern County, CA

  6. Economic considerations in coverting from oil/gas firing to coal

    NASA Technical Reports Server (NTRS)

    Rau, J. G.

    1978-01-01

    Economic considerations involved in fuel conversion such as from oil and/or gas firing to coal are discussed including investments costs for new facilities and equipment (including air pollution control equipment), operation and maintenance costs, and purchased fuel costs. An analytical approach to assessing the cost effectiveness of fuel conversion in terms of the annual net cost of conversion, the equivalent annual number of barrels of oil saved, and the integral rate of return of the conversion investment is presented. Illustrative numerical examples are presented for typical utility boilers and industrial boiler facilities. A further consideration addressed deals with the impacts of these costs on the overall financial structure of the firm and the ability of the firm to raise the necessary investment captial.

  7. Aviation Engine Test Facilities (AETF) fire protection study

    NASA Astrophysics Data System (ADS)

    Beller, R. C.; Burns, R. E.; Leonard, J. T.

    1989-07-01

    An analysis is presented to the effectiveness of various types of fire fighting agents in extinguishing the kinds of fires anticipated in Aviation Engine Test Facilities (AETF), otherwise known as Hush Houses. The agents considered include Aqueous Film-Forming Foam, Halon 1301, Halon 1211 and water. Previous test work has shown the rapidity with which aircraft, especially high performance aircraft, can be damaged by fire. Based on this, tentative criteria for this evaluation included a maximum time of 20 s from fire detection to extinguishment and a period of 30 min in which the agent would prevent reignition. Other issues examined included: toxicity, corrosivity, ease of personnel egress, system reliability, and cost effectiveness. The agents were evaluated for their performance in several fire scenarios, including: under frame fire, major engine fire, engine disintegration fire, high-volume pool fire with simultaneous spill fire, internal electrical fire, and runaway engine fire.

  8. The Ins and Outs of Modern Doors.

    ERIC Educational Resources Information Center

    College Planning & Management, 1999

    1999-01-01

    Discusses the qualities and trends in modern metal doors for educational facilities that include fire protection and sound-control attributes. Important differences in door manufacturing methods and materials are addressed and sound-transmission class values, ratings, and rating descriptions are listed. (GR)

  9. Drought differentially affects the post-fire dynamics of seeders and resprouters in a Mediterranean shrubland.

    PubMed

    Parra, Antonio; Moreno, José M

    2018-06-01

    In fire-prone ecosystems, changes in rainfall after fire could differentially affect seeders and resprouters, thus leading to long-lasting impacts on the vegetation. Climate change in the Mediterranean region is projected to reduce precipitation, expand the summer drought and increase fire danger. Understanding the sensitivity to changes in rainfall during the post-fire regeneration stage is critical to anticipate the impacts of climate change on Mediterranean-type areas of the world. Here, we investigated how species differing in post-fire regeneration strategy (seeders vs resprouters) responded to rainfall changes in a Cistus-Erica shrubland of central Spain. Drought treatments were implemented using a system of automatic rainout shelters with an irrigation facility before (one season) and after (four years) burning a set of experimental plots. Treatments applied were: environmental control (natural rainfall), historical control (mimicking the long-term rainfall), moderate drought (-25% rainfall), and severe drought (-45% rainfall). Plant demography and vigour (main woody shrubs), as well as abundance (shrubs and herbs) were monitored during the first four years after fire. The first post-fire year was the key period for the recovery of seeders (Cistus ladanifer and Rosmarinus officinalis), and their recruitment, cover and size significantly decreased with drought. However, density four years after fire was larger than unburned and it was significantly correlated with emergence during the first year, indicating that population controls were more on emergence than on establishment. In contrast, resprouters (Erica arborea, Erica scoparia and Phillyrea angustifolia) were hardly affected by drought. Plant community dynamics in the burned control plots progressively converged with the unburned ones, while that in the drought-treated plots lagged behind them, maintaining a higher cover, richness and diversity of herbs. This post-fire "herbalization" due to drought might facilitate an untimely fire, before seeders would reach sexual maturity, which could have major implications for the maintenance of the community. Copyright © 2018 Elsevier B.V. All rights reserved.

  10. Joint Interdiction

    DTIC Science & Technology

    2016-09-09

    law enforcement detachment (USCG) LEO law enforcement operations LOC line of communications MACCS Marine air command and control system MAS...enemy command and control [C2], intelligence, fires, reinforcing units, lines of communications [ LOCs ], logistics, and other operational- and tactical...enemy naval, engineering, and personnel resources to the tasks of repairing and recovering damaged equipment, facilities, and LOCs . It can draw the

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tom Elicson; Bentley Harwood; Jim Bouchard

    Over a 12 month period, a fire PRA was developed for a DOE facility using the NUREG/CR-6850 EPRI/NRC fire PRA methodology. The fire PRA modeling included calculation of fire severity factors (SFs) and fire non-suppression probabilities (PNS) for each safe shutdown (SSD) component considered in the fire PRA model. The SFs were developed by performing detailed fire modeling through a combination of CFAST fire zone model calculations and Latin Hypercube Sampling (LHS). Component damage times and automatic fire suppression system actuation times calculated in the CFAST LHS analyses were then input to a time-dependent model of fire non-suppression probability. Themore » fire non-suppression probability model is based on the modeling approach outlined in NUREG/CR-6850 and is supplemented with plant specific data. This paper presents the methodology used in the DOE facility fire PRA for modeling fire-induced SSD component failures and includes discussions of modeling techniques for: • Development of time-dependent fire heat release rate profiles (required as input to CFAST), • Calculation of fire severity factors based on CFAST detailed fire modeling, and • Calculation of fire non-suppression probabilities.« less

  12. Fire protection for launch facilities using machine vision fire detection

    NASA Astrophysics Data System (ADS)

    Schwartz, Douglas B.

    1993-02-01

    Fire protection of critical space assets, including launch and fueling facilities and manned flight hardware, demands automatic sensors for continuous monitoring, and in certain high-threat areas, fast-reacting automatic suppression systems. Perhaps the most essential characteristic for these fire detection and suppression systems is high reliability; in other words, fire detectors should alarm only on actual fires and not be falsely activated by extraneous sources. Existing types of fire detectors have been greatly improved in the past decade; however, fundamental limitations of their method of operation leaves open a significant possibility of false alarms and restricts their usefulness. At the Civil Engineering Laboratory at Tyndall Air Force Base in Florida, a new type of fire detector is under development which 'sees' a fire visually, like a human being, and makes a reliable decision based on known visual characteristics of flames. Hardware prototypes of the Machine Vision (MV) Fire Detection System have undergone live fire tests and demonstrated extremely high accuracy in discriminating actual fires from false alarm sources. In fact, this technology promises to virtually eliminate false activations. This detector could be used to monitor fueling facilities, launch towers, clean rooms, and other high-value and high-risk areas. Applications can extend to space station and in-flight shuttle operations as well; fiber optics and remote camera heads enable the system to see around obstructed areas and crew compartments. The capability of the technology to distinguish fires means that fire detection can be provided even during maintenance operations, such as welding.

  13. Fire protection for launch facilities using machine vision fire detection

    NASA Technical Reports Server (NTRS)

    Schwartz, Douglas B.

    1993-01-01

    Fire protection of critical space assets, including launch and fueling facilities and manned flight hardware, demands automatic sensors for continuous monitoring, and in certain high-threat areas, fast-reacting automatic suppression systems. Perhaps the most essential characteristic for these fire detection and suppression systems is high reliability; in other words, fire detectors should alarm only on actual fires and not be falsely activated by extraneous sources. Existing types of fire detectors have been greatly improved in the past decade; however, fundamental limitations of their method of operation leaves open a significant possibility of false alarms and restricts their usefulness. At the Civil Engineering Laboratory at Tyndall Air Force Base in Florida, a new type of fire detector is under development which 'sees' a fire visually, like a human being, and makes a reliable decision based on known visual characteristics of flames. Hardware prototypes of the Machine Vision (MV) Fire Detection System have undergone live fire tests and demonstrated extremely high accuracy in discriminating actual fires from false alarm sources. In fact, this technology promises to virtually eliminate false activations. This detector could be used to monitor fueling facilities, launch towers, clean rooms, and other high-value and high-risk areas. Applications can extend to space station and in-flight shuttle operations as well; fiber optics and remote camera heads enable the system to see around obstructed areas and crew compartments. The capability of the technology to distinguish fires means that fire detection can be provided even during maintenance operations, such as welding.

  14. Wildfires

    MedlinePlus

    ... motels Expand sub-navigation Hotel fire safety tips Marijuana grow & extraction facilities Nightclubs and other assembly occupancies ... Fire behavior research Fire loss and injury research Benefits of home fire sprinklers Expand sub-navigation Environmental ...

  15. Control Strategies for Zebra Mussel Infestations at Public Facilities

    DTIC Science & Technology

    1992-07-01

    detailed examina- tion of hard -to-reach surfaces or specific components (such as fire protection systems or intake pipes for sensor devices) should...trash racks. Trash racks could become partially clogged with zebra mussels, shells , and other debris. Flow through the openings would be reduced, and... shells to the top of the lock wall. These are now used by Ontario Hydro for removing zebra mussels. At most facilities, the culvert is totally dewatered

  16. Liquid hydrogen turbopump ALS advanced development program. Volume 1: Hot fire unit

    NASA Technical Reports Server (NTRS)

    Lindley, Bruce

    1990-01-01

    The interface criteria for the Turbopump Test article (TPA) and the Component Test Facility located at NASA, Stennis Space Center is defined by this interface Control Document (ICD). TPA ICD Volume 2 is submitted for the Cold Gas Drive Turbopump Test Article, which is generally similar but incorporates certain changes, particularly in fluid requirements and in instrumentation needs. For the purposes of this ICD, the test article consists of the Hot Fire Drive Turbopump mounted on its test cart, readied for installation in the component test facility. It should be emphasized that the LH2 turbopump program is still in its early concept design phase. Design of the turbopump, test cart, and spools are subject to revisions until successful conclusion of the Detail Design Review (DDR).

  17. Maintenance Facilities for Ammunition, Explosives, and Toxics. Design Manual 28.3.

    DTIC Science & Technology

    1981-11-01

    LOADING DOCK RAMP PROTECTION 28.3-2 8. FIRE PROTECTION 28.3-2 9. SECURITY 28.3-2 10. SAFETY 28.3-2 Section 2. GENERAL AMMUNITION MAINTENANCE SHOPS 28.3...protection in accordance with Section 3 1910.23c, Occupatioual Safety and Health Act Standards Manual. 5 8. FIRE PROTECTION. Fire protection for all...Volume 1, and Fire Protection Engineering, NAVFAC DM-8. 9. SECURITY. Maintenance facilities for ammunition, explosives, and I toxics shall be located so

  18. Impacts: NIST Building and Fire Research Laboratory (technical and societal)

    NASA Astrophysics Data System (ADS)

    Raufaste, N. J.

    1993-08-01

    The Building and Fire Research Laboratory (BFRL) of the National Institute of Standards and Technology (NIST) is dedicated to the life cycle quality of constructed facilities. The report describes major effects of BFRL's program on building and fire research. Contents of the document include: structural reliability; nondestructive testing of concrete; structural failure investigations; seismic design and construction standards; rehabilitation codes and standards; alternative refrigerants research; HVAC simulation models; thermal insulation; residential equipment energy efficiency; residential plumbing standards; computer image evaluation of building materials; corrosion-protection for reinforcing steel; prediction of the service lives of building materials; quality of construction materials laboratory testing; roofing standards; simulating fires with computers; fire safety evaluation system; fire investigations; soot formation and evolution; cone calorimeter development; smoke detector standards; standard for the flammability of children's sleepwear; smoldering insulation fires; wood heating safety research; in-place testing of concrete; communication protocols for building automation and control systems; computer simulation of the properties of concrete and other porous materials; cigarette-induced furniture fires; carbon monoxide formation in enclosure fires; halon alternative fire extinguishing agents; turbulent mixing research; materials fire research; furniture flammability testing; standard for the cigarette ignition resistance of mattresses; support of navy firefighter trainer program; and using fire to clean up oil spills.

  19. Innovation for Pollution Control

    NASA Technical Reports Server (NTRS)

    1986-01-01

    Kinetic Controls Inc.'s refuse-fired steam generating facility led to the development of an air pollution equipment control device. The device is currently marketed by two NASA/Langley Research Center employees. It automatically senses and compensates for the changes in smoke composition when refuse is used as a fuel by adjusting the precipitator's voltage and current to permit maximum collection of electrically charged dust particles. The control adapts to any electrostatic precipitator and should have extensive commercial applications.

  20. Fire hazard analysis for Plutonium Finishing Plant complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCKINNIS, D.L.

    1999-02-23

    A fire hazards analysis (FHA) was performed for the Plutonium Finishing Plant (PFP) Complex at the Department of Energy (DOE) Hanford site. The scope of the FHA focuses on the nuclear facilities/structures in the Complex. The analysis was conducted in accordance with RLID 5480.7, [DOE Directive RLID 5480.7, 1/17/94] and DOE Order 5480.7A, ''Fire Protection'' [DOE Order 5480.7A, 2/17/93] and addresses each of the sixteen principle elements outlined in paragraph 9.a(3) of the Order. The elements are addressed in terms of the fire protection objectives stated in paragraph 4 of DOE 5480.7A. In addition, the FHA also complies with WHC-CM-4-41,more » Fire Protection Program Manual, Section 3.4 [1994] and WHC-SD-GN-FHA-30001, Rev. 0 [WHC, 1994]. Objectives of the FHA are to determine: (1) the fire hazards that expose the PFP facilities, or that are inherent in the building operations, (2) the adequacy of the fire safety features currently located in the PFP Complex, and (3) the degree of compliance of the facility with specific fire safety provisions in DOE orders, related engineering codes, and standards.« less

  1. 40 CFR 265.35 - Required aisle space.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Required aisle space. 265.35 Section... FACILITIES Preparedness and Prevention § 265.35 Required aisle space. The owner or operator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control...

  2. 40 CFR 265.35 - Required aisle space.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Required aisle space. 265.35 Section... FACILITIES Preparedness and Prevention § 265.35 Required aisle space. The owner or operator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control...

  3. 40 CFR 265.35 - Required aisle space.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Required aisle space. 265.35 Section... FACILITIES Preparedness and Prevention § 265.35 Required aisle space. The owner or operator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control...

  4. 40 CFR 265.35 - Required aisle space.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Required aisle space. 265.35 Section... FACILITIES Preparedness and Prevention § 265.35 Required aisle space. The owner or operator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control...

  5. 40 CFR 265.35 - Required aisle space.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Required aisle space. 265.35 Section... FACILITIES Preparedness and Prevention § 265.35 Required aisle space. The owner or operator must maintain aisle space to allow the unobstructed movement of personnel, fire protection equipment, spill control...

  6. B-1 and B-3 Test Stands at NASA’s Plum Brook Station

    NASA Image and Video Library

    1966-09-21

    Operation of the High Energy Rocket Engine Research Facility (B-1), left, and Nuclear Rocket Dynamics and Control Facility (B-3) at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The test stands were constructed in the early 1960s to test full-scale liquid hydrogen fuel systems in simulated altitude conditions. Over the next decade each stand was used for two major series of liquid hydrogen rocket tests: the Nuclear Engine for Rocket Vehicle Application (NERVA) and the Centaur second-stage rocket program. The different components of these rocket engines could be studied under flight conditions and adjusted without having to fire the engine. Once the preliminary studies were complete, the entire engine could be fired in larger facilities. The test stands were vertical towers with cryogenic fuel and steam ejector systems. B-1 was 135 feet tall, and B-3 was 210 feet tall. Each test stand had several levels, a test section, and ground floor shop areas. The test stands relied on an array of support buildings to conduct their tests, including a control building, steam exhaust system, and fuel storage and pumping facilities. A large steam-powered altitude exhaust system reduced the pressure at the exhaust nozzle exit of each test stand. This allowed B-1 and B-3 to test turbopump performance in conditions that matched the altitudes of space.

  7. Optical properties of thermal control coating contaminated by MMH/N2O4 5-pound thruster in a vacuum environment with solar simulation

    NASA Technical Reports Server (NTRS)

    Sommers, R. D.; Raquet, C. A.; Cassidy, J. F.

    1972-01-01

    Cat-a-lac Black, and S13G thermal control coatings were exposed to the exhaust of a thruster in a simulated space environment. Vacuum was maintained at less than 10 to the minus 5th power torr during thruster firing in the liquid helium cooled facility. The thruster was fired in a 50-millisecond pulse mode and the accumulated firing time was 224 seconds. Solar absorptance (alpha sub s) and thermal emittance (sigma) of the coatings were measured in-situ at intervals of 300 pulses. A calorimetric technique was used to measure alpha sub s and sigma. The tests, technique, and test results are presented. The Cat-a-lac Black coatings showed no change in alpha sub s or sigma. The S13G showed up to 25 percent increase in alpha sub s but no change in sigma.

  8. Fire endurance research at the Forest Products Laboratory

    Treesearch

    R. H. White

    1990-01-01

    Fire endurance research activities and facilities at the FPL concern the ability of a wood member or assembly to withstand the effects of fire while acting as a fire barrier and supporting a load. Fire endurance is generally concerned with the post-flashover portion of the fire. The importance of fire endurance in fire safety is reflected in building code requirements...

  9. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  10. Finding of No Significant Impact and Finding of No Practicable Aleternative for the Environmental Assessment for the 21 Point Enclosed Firing Range at Joint-Base Andrews-Naval Air Facility Washington, Maryland

    DTIC Science & Technology

    2015-03-02

    Corps of Engineers Joint Base Andrews-Naval Air Facility Final EA – Firing Range October 2014 v WSSC Washington Suburban Sanitary Commission...are leaving the site with waste residue still on their skin and uniforms. Per section 7.6.1.7 [Latrines ( Sanitary Facilities)] in ETL 11-18 (Small...served by water, sanitary sewer, and power. A fire hydrant exists on the site, while another hydrant exists at the intersection of the entry road and

  11. Cast Coil Transformer Fire Susceptibility and Reliability Study

    DTIC Science & Technology

    1991-04-01

    transformers reduce risk to the user compared to liquid-filled units, eliminate environmental impacts, are more efficient than most transformer designs, and...filled units, eliminate environmental impacts, arc more efficient than most transformer designs, and add minimal risk to the facility in a fire situation...add minimal risk to the facility in a fire situation. Cast coil transformers have a long record of operation and have proven to be reliable and

  12. Leakage of radioactive materials from particle accelerator facilities by non-radiation disasters like fire and flooding and its environmental impacts

    NASA Astrophysics Data System (ADS)

    Lee, A.; Jung, N. S.; Mokhtari Oranj, L.; Lee, H. S.

    2018-06-01

    The leakage of radioactive materials generated at particle accelerator facilities is one of the important issues in the view of radiation safety. In this study, fire and flooding at particle accelerator facilities were considered as the non-radiation disasters which result in the leakage of radioactive materials. To analyse the expected effects at each disaster, the case study on fired and flooded particle accelerator facilities was carried out with the property investigation of interesting materials presented in the accelerator tunnel and the activity estimation. Five major materials in the tunnel were investigated: dust, insulators, concrete, metals and paints. The activation levels on the concerned materials were calculated using several Monte Carlo codes (MCNPX 2.7+SP-FISPACT 2007, FLUKA 2011.4c and PHITS 2.64+DCHAIN-SP 2001). The impact weight to environment was estimated for the different beam particles (electron, proton, carbon and uranium) and the different beam energies (100, 430, 600 and 1000 MeV/nucleon). With the consideration of the leakage path of radioactive materials due to fire and flooding, the activation level of selected materials, and the impacts to the environment were evaluated. In the case of flooding, dust, concrete and metal were found as a considerable object. In the case of fire event, dust, insulator and paint were the major concerns. As expected, the influence of normal fire and flooding at electron accelerator facilities would be relatively low for both cases.

  13. Smoke Alarms for People Who Are Deaf or Hard-of-Hearing

    MedlinePlus

    ... motels Expand sub-navigation Hotel fire safety tips Marijuana grow & extraction facilities Nightclubs and other assembly occupancies ... Fire behavior research Fire loss and injury research Benefits of home fire sprinklers Expand sub-navigation Environmental ...

  14. Dry sorbent injection of trona to control acid gases from a pilot-scale coal-fired combustion facility

    EPA Science Inventory

    Gaseous and particulate emissions from the combustion of coal have been associated with adverse effects on human and environmental health, and have for that reason been subject to regulation by federal and state governments. Recent regulations by the United States Environmental ...

  15. Brevard Top Scholars

    NASA Image and Video Library

    2017-05-05

    About 40 Brevard County high school seniors attended Brevard Top Scholars Day at Kennedy Space Center on May 5. Kennedy's Office of Education coordinated the event that featured a special behind-the-scenes tour of Kennedy, including prototype shops, cryogenic labs and facilities such as the Vehicle Assembly Building and the Launch Control Center firing rooms.

  16. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  17. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  18. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION... experimental nature of the facility or fire, flood, explosion, strike, sabotage, domestic violence, enemy... submitted to the Document Control Desk, U.S. Nuclear Regulatory Commission, by an appropriate method listed...

  19. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... hazardous surface water run-offs from water or chemical agents used to control fire and heat-induced... injuries, if any; and (vi) The possible hazards to human health, or the environment, outside the facility... quantity of material(s) involved; (5) The extent of injuries, if any; (6) An assessment of actual or...

  20. Medicare and Medicaid programs; fire safety requirements for certain health care facilities. Final rule.

    PubMed

    2003-01-10

    This final rule amends the fire safety standards for hospitals, long-term care facilities, intermediate care facilities for the mentally retarded, ambulatory surgery centers, hospices that provide inpatient services, religious nonmedical health care institutions, critical access hospitals, and Programs of All-Inclusive Care for the Elderly facilities. Further, this final rule adopts the 2000 edition of the Life Safety Code and eliminates references in our regulations to all earlier editions.

  1. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less

  2. Fire safety design of a mobile quarantine facility

    NASA Technical Reports Server (NTRS)

    Bass, R. S.; Hirasaki, J. K.

    1971-01-01

    During the design phase of the Mobile Quarantine Facility (MQF), a primary consideration was fire safety. Therefore, appropriate criteria and ground rules were used in the design and construction of the facility. The fire codes and fire-requirement listings that are used by commerical airlines were supplied to the Manned Spacecraft Center (MSC) by the Federal Aviation Agency (FAA). After these codes were reviewed, a basic ground rule was adopted that flame protection for all combustible materials should be at least equivalent to or better than the standards for commercial aircraft. Because the MQF was designed to operate with an interior atmosphere of air rather than with an oxygen-enriched atmosphere such as that of the Apollo spacecraft cabin, the requirements for MQF material were not as stringent as those for the spacecraft.

  3. Vying for control of CHAMPUS funds.

    PubMed

    Kenkel, P J

    1991-04-08

    Advocating a "coordinated care" approach to healthcare for military retirees and their dependents, the Pentagon is hoping for a victory in its battle with civilian managed-care contractors for control of CHAMPUS funds. But coordinated care, which would give military hospital commanders the added responsibility of overseeing healthcare spending outside military facilities, has drawn fire from critics who say commanders lack the expertise to run such a program.

  4. NASA Ames Research Center 60 MW Power Supply Modernization

    NASA Technical Reports Server (NTRS)

    Choy, Yuen Ching; Ilinets, Boris V.; Miller, Ted; Nagel, Kirsten (Technical Monitor)

    2001-01-01

    The NASA Ames Research Center 60 MW DC Power Supply was built in 1974 to provide controlled DC power for the Thermophysics Facility Arc Jet Laboratory. The Power Supply has gradually losing reliability due to outdated technology and component life limitation. NASA has decided to upgrade the existing rectifier modules with contemporary high-power electronics and control equipment. NASA plans to complete this project in 2001. This project includes a complete replacement of obsolete thyristor stacks in all six rectifier modules and rectifier bridge control system. High power water-cooled thyristors and freewheeling diodes will be used. The rating of each of the six modules will be 4000 A at 5500 V. The control firing angle signal will be sent from the Facility Control System to six modules via fiberoptic cable. The Power Supply control and monitoring system will include a Master PLC in the Facility building and a Slave PLC in each rectifier module. This system will also monitor each thyristor level in each stack and the auxiliary equipment.

  5. Spacecraft fire-safety experiments for space station: Technology development mission

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.

    1988-01-01

    Three concept designs for low-gravity, fire-safety related experiments are presented, as selected for the purpose of addressing key issues of enhancing safety and yet encouraging access to long-duration, manned spacecraft such as the NASA space station. The selected low-gravity experiments are the following: (1) an investigation of the flame-spread rate and combustion-product evolution of the burning of typical thicknesses of spacecraft materials in very low-speed flows; (2) an evaluation of the interaction of fires and candidate extinguishers in various fire scenarios; and (3) an investigation of the persistence and propagation of smoldering and deep-seated combustion. Each experiment is expected to provide fundamental combustion-science data, as well as the fire-safety applications, and each requires the unique long-duration, low-gravity environment of the space station. Two generic test facilities, i.e., the Combustion Tunnel Facility and the Combustion Facility, are proposed for space station accommodation to support the selected experiments. In addition, three near-term, fire-safety related experiments are described along with other related precursor activities.

  6. Facilities and Methods Used in Full-scale Airplane Crash-fire Investigation

    NASA Technical Reports Server (NTRS)

    Black, Dugald O.

    1952-01-01

    The facilities and the techniques employed in the conduct of full scale airplane crash-fire studies currently being conducted at the NACA Lewis laboratory are discussed herein. This investigation is part of a comprehensive study of the airplane crash-fire problem. The crash configuration chosen, the general physical layout of the crash site, the test methods, the instrumentation, the data-recording systems, and the post-crash examination procedure are described

  7. 36 CFR 331.15 - Fires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Fires. 331.15 Section 331.15... INDIANA § 331.15 Fires. Open fires are prohibited unless confined to fireplaces, grills, or other facilities designed for this purpose as designated by the District Engineer. Fires shall not be left...

  8. Fire Safety. Managing School Facilities, Guide 6.

    ERIC Educational Resources Information Center

    Department for Education and Employment, London (England). Architects and Building Branch.

    This booklet discusses how United Kingdom schools can manage fire safety and minimize the risk of fire. The guide examines what legislation school buildings must comply with and covers the major risks. It also describes training and evacuation procedures and provides guidance on fire precautions, alarm systems, fire fighting equipment, and escape…

  9. 75 FR 39664 - Grant of Authority For Subzone Status Materials Science Technology, Inc. (Specialty Elastomers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Status Materials Science Technology, Inc. (Specialty Elastomers and Fire Retardant Chemicals) Conroe... specialty elastomer manufacturing and distribution facility of Materials Science Technology, Inc., located... and distribution of specialty elastomers and fire retardant chemicals at the facility of Materials...

  10. Operations of cleanrooms during a forest fire including protocols and monitoring results

    NASA Astrophysics Data System (ADS)

    Matheson, Bruce A.; Egges, Joanne; Pirkey, Michael S.; Lobmeyer, Lynette D.

    2012-10-01

    Contamination-sensitive space flight hardware is typically built in cleanroom facilities in order to protect the hardware from particle contamination. Forest wildfires near the facilities greatly increase the number of particles and amount of vapors in the ambient outside air. Reasonable questions arise as to whether typical cleanroom facilities can adequately protect the hardware from these adverse environmental conditions. On Monday September 6, 2010 (Labor Day Holiday), a large wildfire ignited near the Boulder, Colorado Campus of Ball Aerospace. The fire was approximately 6 miles from the Boulder City limits. Smoke levels from the fire stayed very high in Boulder for the majority of the week after the fire began. Cleanroom operations were halted temporarily on contamination sensitive hardware, until particulate and non-volatile residue (NVR) sampling could be performed. Immediate monitoring showed little, if any effect on the cleanroom facilities, so programs were allowed to resume work while monitoring continued for several days and beyond in some cases. Little, if any, effect was ever noticed in the monitoring performed.

  11. Basis for Interim Operation for Fuel Supply Shutdown Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENECKE, M.W.

    2003-02-03

    This document establishes the Basis for Interim Operation (BIO) for the Fuel Supply Shutdown Facility (FSS) as managed by the 300 Area Deactivation Project (300 ADP) organization in accordance with the requirements of the Project Hanford Management Contract procedure (PHMC) HNF-PRO-700, ''Safety Analysis and Technical Safety Requirements''. A hazard classification (Benecke 2003a) has been prepared for the facility in accordance with DOE-STD-1027-92 resulting in the assignment of Hazard Category 3 for FSS Facility buildings that store N Reactor fuel materials (303-B, 3712, and 3716). All others are designated Industrial buildings. It is concluded that the risks associated with the currentmore » and planned operational mode of the FSS Facility (uranium storage, uranium repackaging and shipment, cleanup, and transition activities, etc.) are acceptable. The potential radiological dose and toxicological consequences for a range of credible uranium storage building have been analyzed using Hanford accepted methods. Risk Class designations are summarized for representative events in Table 1.6-1. Mitigation was not considered for any event except the random fire event that exceeds predicted consequences based on existing source and combustible loading because of an inadvertent increase in combustible loading. For that event, a housekeeping program to manage transient combustibles is credited to reduce the probability. An additional administrative control is established to protect assumptions regarding source term by limiting inventories of fuel and combustible materials. Another is established to maintain the criticality safety program. Additional defense-in-depth controls are established to perform fire protection system testing, inspection, and maintenance to ensure predicted availability of those systems, and to maintain the radiological control program. It is also concluded that because an accidental nuclear criticality is not credible based on the low uranium enrichment, the form of the uranium, and the required controls, a Criticality Alarm System (CAS) is not required as allowed by DOE Order 420.1 (DOE 2000).« less

  12. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Additional safety equipment... Pipeline Components § 192.171 Compressor stations: Additional safety equipment. (a) Each compressor station must have adequate fire protection facilities. If fire pumps are a part of these facilities, their...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sommer, T.; Melick, T.; Morrison, D.

    The objective of this DOE sponsored project was to successfully fire coal-water slurry in a fire-tube boiler that was designed for oil/gas firing and establish a data base that will be relevant to a large number of existing installations. Firing slurry in a fire-tube configuration is a very demanding application because of the extremely high heat release rates and the correspondingly low furnace volume where combustion can be completed. Recognizing that combustion efficiency is the major obstacle when firing slurry in a fire-tube boiler, the program was focused on innovative approaches for improving carbon burnout without major modifications to themore » boiler. The boiler system was successfully designed and operated to fire coal-water slurry for extended periods of time with few slurry related operational problems. The host facility was a 3.8 million Btu/hr Cleaver-Brooks fire-tube boiler located on the University of Alabama Campus. A slurry atomizer was designed that provided outstanding atomization and was not susceptible to pluggage. The boiler was operated for over 1000 hours and 12 shipments of slurry were delivered. The new equipment engineered for the coal-water slurry system consisted of the following: combustion air and slurry heaters; cyclone; baghouse; fly ash reinjection system; new control system; air compressor; CWS/gas burner and gas valve train; and storage tank and slurry handling system.« less

  14. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2002-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility hydrolysis production has been completed to produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material was used atmore » EERC as baseline material and for mixing with the bio-fuel for combustion testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary co-fire test results indicate that the blending of lignin and bio-solids with the Colbert coal blend generally reduces NO{sub x} emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. The final co-fire testing report is being prepared at EERC and will be completed by the end of the second quarter of 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for the steam supply system was completed. The cost estimate and output and heat rate impacts have been used to determine a preliminary price for the exported steam. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility.« less

  15. 76 FR 10246 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... regulations and update the standards for VA approval of such facilities, including standards for fire safety... to ``RIN 2900-AN57--Updating Fire Safety [[Page 10247

  16. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  17. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  18. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  19. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  20. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  1. Fire Fighter Level I-II-III [and] Practical Skills Test. Wisconsin Fire Service Certification Series. Final Revision.

    ERIC Educational Resources Information Center

    Pribyl, Paul F.

    Practical skills tests are provided for fire fighter trainees in the Wisconsin Fire Service Certification Series, Fire Fighter Levels I, II, and III. A course introduction appears first and contains this information: recommended instructional sequence, required facilities, instructional methodology, requirements for certification, course…

  2. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-10-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed tomore » produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio-based fuels is scheduled to begin in October of 2001. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam.« less

  3. Pollution Measuring System

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Research Ventures, Inc.'s visiplume is a portable, microprocessor-controlled air pollution monitor for measuring sulfur dioxide emissions from fossil fuel-fired power plants, and facilities that manufacture sulfuric acid. It observes smokestack plumes at a distance from the stack obviating the expense and difficulty of installing sample collectors in each stack and later analyzing the samples.

  4. Updating fire safety standards. Final rule; affirmation.

    PubMed

    2011-11-16

    This document affirms as final, without changes, a provision included in a final rule with request for comments that amended the Department of Veterans Affairs (VA) regulations concerning community residential care facilities, contract facilities for certain outpatient and residential services, and State home facilities. That provision established a five-year period within which all covered buildings with nursing home facilities existing as of June 25, 2001, must conform to the automatic sprinkler requirement of the 2009 edition of the National Fire Protection Association (NFPA) 101. This rule helps ensure the safety of veterans in the affected facilities.

  5. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of... must have adequate fire protection facilities. If fire pumps are a part of these facilities, their... event of inadequate cooling or lubrication of the unit. (d) Each compressor station gas engine that...

  6. 10 CFR 503.25 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES Temporary Exemptions for New Facilities § 503.25..., during the construction of an alternate-fuel fired unit, the petitioner may substitute, in lieu of the... during the construction of an alternate fuel fired unit to be owned or operated by the petitioner; and (2...

  7. Firing Room Remote Application Software Development

    NASA Technical Reports Server (NTRS)

    Liu, Kan

    2015-01-01

    The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.

  8. Preventing Fire Death and Injury, Conducting a Fire Drill in a Group Home [and] When You Need a Fire Safety Expert. National Fire Safety Certification System. Continuing Education Program. Volume 1, Numbers 1-3.

    ERIC Educational Resources Information Center

    Walker, Bonnie

    Three booklets provide fire safety information for staff of residential facilities serving people with developmental disabilities. Booklets focus on: (1) preventing fire death and injury, (2) conducting a fire drill in a group home, and (3) the role of fire safety experts. The first booklet stresses the elimination of the following dangers:…

  9. Occupancy Fire Record: Schools.

    ERIC Educational Resources Information Center

    National Fire Protection Association, Boston, MA.

    The considerations of human safety and preservation of facilities are examined in relation to school fires. Various aspects of planning which would decrease the probability of fires and thereby save life and property are reviewed and include--(1) causes, (2) automatic protection devices, (3) evacuation and fire drills, and (4) construction…

  10. Feasibility of a small central cogenerated energy facility: Energy management memorandum

    NASA Astrophysics Data System (ADS)

    Porter, R. N.

    1982-10-01

    The thermal economic feasibility of a small cogenerated energy facility designed to serve several industries in the Stockyards area was investigated. Cogeneration options included two dual fuel diesels and two gas turbines, all with waste heat boilers, and five fired boilers. Fuels included natural gas, and for the fired boiler cases, also low sulphur coal and municipal refuse. For coal and refuse, the option of steam only without cogeneration was also assessed. The fired boiler cogeneration systems employed back pressure steam turbines. The refuse fired cases utilized electrical capacities, 8500 to 52,400 lbm/hr and 0 to 9.9 MW (e), respectively. Deficient steam was assumed generated independently in existing equipment. Excess electrical power over that which was displaced was sold to Commonwealth Edison Company under PURPA (Public Utility Regulatory Policies Act). The facility was operated by a mutually owned corporation formed by the cogenerated power users.

  11. Ten Fire Safety Tips for Schools.

    ERIC Educational Resources Information Center

    Lake, James D.

    1999-01-01

    Provides 10 basic tips, compiled from the National Fire Protection Association's Life Safety Code 101, to ensure that educational facilities are fire safe. Tips include use of frequent and unexpected fire drills, limiting wall space of student artwork and teaching materials, being alert to preventing arson, planning speedy and safe emergency…

  12. 75 FR 17641 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... for VA approval of such facilities, including standards for fire safety and heating and cooling... submitted in response to ``RIN 2900-AN57--Updating Fire Safety Standards.'' Copies of comments received will...

  13. FIRE III ACE

    Atmospheric Science Data Center

    2013-01-23

    FIRE III ACE Data Sets The First International Satellite Cloud ... Regional Experiment (FIRE) - Arctic Cloud Experiment (ACE) was conducted April through July of 1998. It was held in conjunction with ... Heat Budget of the Arctic Ocean (SHEBA) Experiment. The FIRE-ACE focused on all aspects of Arctic cloud systems. The main facility was ...

  14. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  15. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  16. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Energy and used in the National Allowance Data Base (or equivalent facility ID number assigned by EPA, if...; (C) Type of boiler (or boilers for a group of units using a common stack); (D) Type of fuel(s) fired... more than one fuel, the fuel classification of the boiler; (E) Type(s) of emission controls for SO2...

  17. 40 CFR 75.53 - Monitoring plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Energy and used in the National Allowance Data Base (or equivalent facility ID number assigned by EPA, if...; (C) Type of boiler (or boilers for a group of units using a common stack); (D) Type of fuel(s) fired... more than one fuel, the fuel classification of the boiler; (E) Type(s) of emission controls for SO2...

  18. The Missoula Fire Sciences Laboratory: A 50-year dedication to understanding wildlands and fire

    Treesearch

    Diane M. Smith

    2012-01-01

    In 1960, the USDA Forest Service established the Northern Forest Fire Laboratory (now the Missoula Fire Sciences Laboratory) to find scientific solutions for better managing the nation's wildland resources and to research ways to improve forest fire prevention and suppression. This new state-of-the-art research facility did not emerge from a vacuum, however. This...

  19. FIRE III ACE Info

    Atmospheric Science Data Center

    2014-03-18

    ... Regional Experiment (FIRE) - Arctic Cloud Experiment (ACE) was conducted April through July of 1998. It was held in conjunction with ... Heat Budget of the Arctic Ocean (SHEBA) Experiment. The FIRE-ACE focused on all aspects of Arctic cloud systems. The main facility was ...

  20. 33 CFR 127.615 - Fires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Fires. 127.615 Section 127.615... Facilities Handling Liquefied Natural Gas Firefighting § 127.615 Fires. In the marine transfer area for LNG, the operator shall ensure that there are no fires when there is LNG present. [CGD 78-038, 53 FR 3376...

  1. 75 FR 35437 - Notice of Request for Extension of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... from construction of a fire station with fire fighting and rescue equipment to financing a 911 emergency system. These facilities are designed to provide fire protection and emergency rescue services to... for a currently approved information collection in support of the program for Fire and Rescue Loans...

  2. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  4. Temperature and heat flux datasets of a complex object in a fire plume for the validation of fire and thermal response codes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jernigan, Dann A.; Blanchat, Thomas K.

    It is necessary to improve understanding and develop temporally- and spatially-resolved integral scale validation data of the heat flux incident to a complex object in addition to measuring the thermal response of said object located within the fire plume for the validation of the SIERRA/FUEGO/SYRINX fire and SIERRA/CALORE codes. To meet this objective, a complex calorimeter with sufficient instrumentation to allow validation of the coupling between FUEGO/SYRINX/CALORE has been designed, fabricated, and tested in the Fire Laboratory for Accreditation of Models and Experiments (FLAME) facility. Validation experiments are specifically designed for direct comparison with the computational predictions. Making meaningful comparisonmore » between the computational and experimental results requires careful characterization and control of the experimental features or parameters used as inputs into the computational model. Validation experiments must be designed to capture the essential physical phenomena, including all relevant initial and boundary conditions. This report presents the data validation steps and processes, the results of the penlight radiant heat experiments (for the purpose of validating the CALORE heat transfer modeling of the complex calorimeter), and the results of the fire tests in FLAME.« less

  5. Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tom Elicson; Bentley Harwood; Richard Yorg

    2011-03-01

    The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it wouldmore » have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.« less

  6. Medicare and Medicaid Programs; Fire Safety Requirements for Certain Health Care Facilities. Final rule.

    PubMed

    2016-05-04

    This final rule will amend the fire safety standards for Medicare and Medicaid participating hospitals, critical access hospitals (CAHs), long-term care facilities, intermediate care facilities for individuals with intellectual disabilities (ICF-IID), ambulatory surgery centers (ASCs), hospices which provide inpatient services, religious non-medical health care institutions (RNHCIs), and programs of all-inclusive care for the elderly (PACE) facilities. Further, this final rule will adopt the 2012 edition of the Life Safety Code (LSC) and eliminate references in our regulations to all earlier editions of the Life Safety Code. It will also adopt the 2012 edition of the Health Care Facilities Code, with some exceptions.

  7. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaltash, Abdolreza

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, andmore » Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.« less

  8. Navy Safety Center data on the effects of fire protection systems on electrical equipment

    NASA Astrophysics Data System (ADS)

    Levine, Robert S.

    1991-04-01

    Records of the Navy Safety Center, Norfolk, VA were reviewed to find data relevant to inadvertant operation of installed fire extinguishing systems in civilian nuclear power plants. Navy data show the incidence of collateral fire or other damage by fresh water on operating electrical equipment in submarines and in shore facilities is about the same as the civilian experience, about 30 percent. Aboard surface ships, however, the collateral damage incidence in much lower, about 15 percent. With sea water, the collateral damage incidence is at least 75 percent. It is concluded that the fire extinguisher water has to be contaminated, as by rust in sprinkler systems or deposited salt spray, for most collateral damage to occur. Reasons for inadvertant operation (or advertant operation) of firex systems at shore facilities, submarines, and surface ships resemble those for nuclear power plants. Mechanical or electrical failures lead the list, followed by mishaps during maintenance. Detector and alarm system failures are significant problems at Navy shore facilities, and significant at nuclear power plants. Fixed halon and CO2 systems in shore facilities cause no collateral damage. Lists of individual Navy incidents with water and with halon and carbon dioxide are included as appendices.

  9. Station set requirements document. Volume 82: Fire support. Book 2: Preliminary functional fire plan

    NASA Technical Reports Server (NTRS)

    Gray, N. C.

    1974-01-01

    The fire prevention/protection requirements for all shuttle facility and ground support equipment are presented for the hazardous operations. These include: preparing the orbiter for launch, launch operations, landing operations, safing operations, and associated off-line activities.

  10. Construction safety in DOE. Part 1, Students guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Handwerk, E C

    This report is the first part of a compilation of safety standards for construction activities on DOE facilities. This report covers the following areas: general safety and health provisions; occupational health and environmental control/haz mat; personal protective equipment; fire protection and prevention; signs, signals, and barricades; materials handling, storage, use, and disposal; hand and power tools; welding and cutting; electrical; and scaffolding.

  11. KSC-91PC-0265

    NASA Image and Video Library

    1991-02-20

    Vice President of the United States Dan Quayle, right, tries on a communications headset in the Launch Control Center and learns about firing room activities from Launch Director Robert Sieck. Quayle spoke with members of the STS-39 flight crew participating in the Terminal Countdown Demonstration Test, toured the launch pad and other center facilities, addressed workers and held a press conference. Image credit: NASA

  12. An Opinion on the Nitrate Film Fire, Suitland, Maryland, 7 December 1978.

    ERIC Educational Resources Information Center

    Utterback, W. H., Jr.

    1980-01-01

    Examines the storage conditions and the circumstances surrounding the film storage facility fire in Suitland, Maryland, which destroyed over 13 million feet of film. Outlines possible causes for the fire and offers recommendations for prevention of such future disasters. (JMF)

  13. [Protecting Safety During Dust Fires and Dust Explosions - The Example of the Formosa Fun Coast Water Park Accident].

    PubMed

    Hsieh, Ming-Hong; Wu, Jia-Wun; Li, Ya-Cing; Tang, Jia-Suei; Hsieh, Chun-Chien

    2016-02-01

    This paper will explore the fire and explosion characteristics of cornstarch powder as well as strategies for protecting the safety of people who are involved a dust fire or dust explosion. We discuss the 5 elements of dust explosions and conduct tests to analyze the fire and explosion characteristics of differently colored powders (yellow, golden yellow, pink, purple, orange and green). The results show that, while all of the tested powders were difficult to ignite, low moisture content was associated with significantly greater risks of ignition and flame spread. We found the auto-ignition temperature (AIT) of air-borne cornstarch powder to be between 385°C and 405°C, with yellow-colored cornstarch powder showing the highest AIT and pink-colored cornstarch powder showing the lowest AIT. The volume resistivity of all powder samples was approximately 108 Ω.m, indicating that they were nonconductive. Lighters and cigarettes are effective ignition sources, as their lit temperatures are higher than the AIT of cornstarch powder. In order to better protect the safety of individuals at venues where cornstarch powder is released, explosion control measures such as explosion containment facilities, vents, and explosion suppression and isolation devices should be installed. Furthermore, employees that work at these venues should be better trained in explosion prevention and control measures. We hope this article is a reminder to the public to recognize the fire and explosion characteristics of flammable powders as well as the preventive and control measures for dust explosions.

  14. The tropical forest and fire emissions experiment: Laboratory fire measurement and synthesis of campaign data

    Treesearch

    R. J. Yokelson; T. J. Christian; T. G. Karl; A. Guenther

    2008-01-01

    As part of the Tropical Forest and Fire Emissions Experiment (TROFFEE), tropical forest fuels were burned in a large, biomass-fire simulation facility and the smoke was characterized with open-path Fourier transform infrared spectroscopy (FTIR), proton-transfer reaction mass spectrometry (PTR-MS), gas chromatography (GC), GC/PTRMS, and filter sampling of the particles...

  15. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  16. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  17. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  18. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  19. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  20. 10 CFR Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... could occur in a nuclear power plant. These sessions shall provide brigade members with experience in... A. Fire protection program. A fire protection program shall be established at each nuclear power... fires that could occur in the plant and in using the types of equipment available in the nuclear power...

  1. 78 FR 59475 - Architectural Barriers Act Accessibility Guidelines; Outdoor Developed Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... following outdoor constructed features provided at these facilities: Picnic tables, fire rings, grills... requirements for picnic tables, fire rings, grills, fireplaces, wood stoves, trash and recycling receptacles... have required 50 percent of picnic tables, fire rings, grills, and benches to comply with the...

  2. Manual for Public School Facilities Fire Prevention and Fire Inspections. [Revised].

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    Designed to provide instruction for New York State inspectors and school administrators completing the annual "Fire Safety Report," this document provides information regarding: (1) the Regulation and Code requirements; (2) inspection and enforcement processes; (3) disputes and procedures for appeal; and (4) financial considerations…

  3. 24 CFR 232.620 - Determination of compliance by HHS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Special Requirements § 232.620 Determination of compliance by HHS. An... the fire safety equipment has been installed, will be in compliance with the HHS requirements for fire...

  4. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  5. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  6. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  7. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  8. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  9. The Portuguese gamma irradiation facility

    NASA Astrophysics Data System (ADS)

    Mendes, C. M.; Almeida, J. C.; Botelho, M. L.; Cavaco, M. C.; Almeida-Vara, E.; Andrade, M. E.

    A Gamma Radiation Facility was built up in the National Laboratory of Industrial Technology and Engineering (LNETI), Lisbon, Portugal. This plant (UTR GAMA-Pi) is a Cobalt-60 dry storage continuous facility with a nominal capacity of 1.5X10 16 Bq. The initial activity is 1.1X10 16 Bq and the troughput capacity 10 3 ton/year for product with a bulk density of 0.2 g/cm 3 treated with a minimum absorbed dose of 25 kGy. Complementary control devices were installed: ventilation system, closed water refrigeration circuit, internal TV system, detection and extinction fire system and emergency power group. It must be emphasized that the best attention was given to the conception and efficiency of the interlock safety systems. This facility will be utilized mainly for radiosterilization of medical articles and decontamination of wine cork stoppers.

  10. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  11. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  12. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  13. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  14. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  15. KSC-91PC-0264

    NASA Image and Video Library

    1991-02-20

    CAPE CANAVERAL, Fla. -- Vice President of the United States Dan Quayle. right. tries on a communications headset in the Launch Control Center and learns about firing room activities from Launch Director Robert Sieck. Quayle spoke with members of the STS-39 flight crew participating in the Terminal Countdown Demonstration Test, toured the launch pad and other center facilities, addressed workers and held a press conference. Image credit: NASA

  16. Brevard Top Scholars

    NASA Image and Video Library

    2017-05-05

    Kennedy Space Center Associate Director Kelvin Manning addresses about 40 Brevard County high school seniors regarding NASA's and Kennedy’s roles and missions during Brevard Top Scholars Day at Kennedy Space Center on May 5. Kennedy's Office of Education coordinated the event that featured a special behind-the-scenes tour of Kennedy, including prototype shops, cryogenic labs and facilities such as the Vehicle Assembly Building and the Launch Control Center firing rooms.

  17. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA's Ares I-X rocket is seen through the windows of Firing Room One of teh Launch Control Center (LCC) at the Kennedy Space Center as it launches from pad 39b in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  18. Fire Incident Reporting Manual

    DTIC Science & Technology

    1984-02-01

    Purpose 1-1 B. Scope 1-1 C. Procedures 1-1 D. Exclusions 1-3 E . Preparation 1-3 F. Information Requirements 1-4 CHAPTER 2 - INSTRUCTIONS FOR PREPARING DoD...Structure and Fire Data 2-16 4. Section D - Fire Protection Facilities (In Structures Only) 2-28 5. Section E - Losses 2-30 6. Section F - Times (24...Activities Program," February 21, 1976 ( e ) National Fire Protection Association (NFPA) Standard 901, "Uniform Coding for Fire Protection," 1976 (f) NFPA

  19. Fluids and Combustion Facility: Combustion Integrated Rack Modal Model Correlation

    NASA Technical Reports Server (NTRS)

    McNelis, Mark E.; Suarez, Vicente J.; Sullivan, Timothy L.; Otten, Kim D.; Akers, James C.

    2005-01-01

    The Fluids and Combustion Facility (FCF) is a modular, multi-user, two-rack facility dedicated to combustion and fluids science in the US Laboratory Destiny on the International Space Station. FCF is a permanent facility that is capable of accommodating up to ten combustion and fluid science investigations per year. FCF research in combustion and fluid science supports NASA's Exploration of Space Initiative for on-orbit fire suppression, fire safety, and space system fluids management. The Combustion Integrated Rack (CIR) is one of two racks in the FCF. The CIR major structural elements include the International Standard Payload Rack (ISPR), Experiment Assembly (optics bench and combustion chamber), Air Thermal Control Unit (ATCU), Rack Door, and Lower Structure Assembly (Input/Output Processor and Electrical Power Control Unit). The load path through the rack structure is outlined. The CIR modal survey was conducted to validate the load path predicted by the CIR finite element model (FEM). The modal survey is done by experimentally measuring the CIR frequencies and mode shapes. The CIR model was test correlated by updating the model to represent the test mode shapes. The correlated CIR model delivery is required by NASA JSC at Launch-10.5 months. The test correlated CIR flight FEM is analytically integrated into the Shuttle for a coupled loads analysis of the launch configuration. The analysis frequency range of interest is 0-50 Hz. A coupled loads analysis is the analytical integration of the Shuttle with its cargo element, the Mini Payload Logistics Module (MPLM), in the Shuttle cargo bay. For each Shuttle launch configuration, a verification coupled loads analysis is performed to determine the loads in the cargo bay as part of the structural certification process.

  20. Requirements and Regulations for Open Burning and Fire Training

    EPA Pesticide Factsheets

    Intentional burning of facilities is considered demolition under federal asbestos regulations, even if no asbestos is present. Learn about regulations and requirements for open burning and fire training.

  1. Testing of a Liquid Oxygen/Liquid Methane Reaction Control Thruster in a New Altitude Rocket Engine Test Facility

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Arrington, Lynn A.; Kleinhenz, Julie E.; Marshall, William M.

    2012-01-01

    A relocated rocket engine test facility, the Altitude Combustion Stand (ACS), was activated in 2009 at the NASA Glenn Research Center. This facility has the capability to test with a variety of propellants and up to a thrust level of 2000 lbf (8.9 kN) with precise measurement of propellant conditions, propellant flow rates, thrust and altitude conditions. These measurements enable accurate determination of a thruster and/or nozzle s altitude performance for both technology development and flight qualification purposes. In addition the facility was designed to enable efficient test operations to control costs for technology and advanced development projects. A liquid oxygen-liquid methane technology development test program was conducted in the ACS from the fall of 2009 to the fall of 2010. Three test phases were conducted investigating different operational modes and in addition, the project required the complexity of controlling propellant inlet temperatures over an extremely wide range. Despite the challenges of a unique propellant (liquid methane) and wide operating conditions, the facility performed well and delivered up to 24 hot fire tests in a single test day. The resulting data validated the feasibility of utilizing this propellant combination for future deep space applications.

  2. Feasibility of a medium-size central cogenerated energy facility, energy management memorandum

    NASA Astrophysics Data System (ADS)

    Porter, R. W.

    1982-09-01

    The thermal-economic feasibility was studied of a medium-size central cogenerated energy facility designed to serve five varied industries. Generation options included one dual-fuel diesel and one gas turbine, both with waste heat boilers, and five fired boilers. Fuels included natural gas, and for the fired-boiler cases, also low-sulphur coal and municipal refuse. The fired-boiler cogeneration systems employed back-pressure steam turbines. For coal and refuse, the option of steam only without cogeneration was also assessed. The refuse-fired cases utilized modular incinerators. The options provided for a wide range of steam and electrical capacities. Deficient steam was assumed generated independently in existing equipment. Excess electrical power over that which could be displaced was assumed sold to Commonwealth Edison Company under PURPA (Public Utility Regulator Policies Act). The facility was assumed operated by a mutually owned corporation formed by the cogenerated power users. The economic analysis was predicted on currently applicable energy-investment tax credits and accelerated depreciation for a January 1985 startup date. Based on 100% equity financing, the results indicated that the best alternative was the modular-incinerator cogeneration system.

  3. Saturn Apollo Program

    NASA Image and Video Library

    1965-01-01

    The Saturn V first stages were test fired at the Mississippi Test Facility and at the Marshall Space Flight Center (MSFC). Five F-1 engines powered the first stage, each developing 1.5 million pounds of thrust. The first stage, known as the S-IC stage, burned over 15 tons of propellant per second during its 2.5 minutes of operation to take the vehicle to a height of about 36 miles and to a speed of about 6,000 miles per hour. The stage was 138 feet long and 33 feet in diameter. This photograph shows the test firing of an F-1 engine at the MSFC's S-IC Static Test Firing Facility.

  4. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  5. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... physical facility; or (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes... as fires, floods, earthquakes, or tornadoes. (5) For cost reporting periods beginning on or after...

  6. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  7. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  8. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  9. Hyperbaric Chamber Equipment: A Consolidated Equipment List from Selected Multiplace Hyperbaric Facilities.

    DTIC Science & Technology

    1983-12-01

    carbon dioxide scrubbers , air conditioning, communications, lighting, and fire detecting and fire extinguishing systems. Medical support equipment was...10 14 Humidity...............................11 5. Hydrocarb on...........................11 B. Carbon Dioxide Scrubbers .....................11 C...and ancillary equipment included gas/vapor monitoring equipment, carbon dioxide scrubbers , air conditioning, communications, lighting, and fire

  10. Fire Protection for Munitions in Underground Storage Facilities

    DTIC Science & Technology

    2001-12-01

    ESFR ) K-25, 165 F (74 C) sprinkler heads, manufactured by Tyco, to provide a discharge density of 0.6 gpm/ft2 (24.4 lpm/m2). The system consisted of...extinguish the fire before adjacent stacks were impacted. Results showed that ESFR K-25 pendant sprinkler heads will operate and inhibit fire spread

  11. When the Fire's Out: Learning from Adversity.

    ERIC Educational Resources Information Center

    Holden, Tom

    1997-01-01

    After a $7 million arson fire destroyed part of a Virginia Beach high school, about 1,200 students were temporarily relocated to a refurbished former mini-mall, and a 16-month recovery project was initiated. The new design improved library and art facilities. School officials have since learned to fight fire with simple precautions, such as…

  12. 40 CFR 80.1403 - Which fuels are not subject to the 20% GHG thresholds?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction after December 19, 2007, and are fired with natural gas, biomass, or a combination thereof, the... are fired with natural gas, biomass, or a combination thereof at all times the facility operated... produced through processes fired with natural gas, biomass, or any combination thereof. (e) The annual...

  13. Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Connell, Daniel P

    2009-01-12

    The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, andmore » HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.« less

  14. Removal of Perfluorooctanoic Acid from Water Using Primitive, Conventional and Novel Carbonaceous Sorbent Materials

    DTIC Science & Technology

    Polyfluoroalkyl Substances ( PFAS ), like perfluorooctanoic acid, have been used for the last 50 years in a wide variety of industrial processes and...The Department of Defense (DoD) has used PFAS -based Aqueous Film Forming Foam (AFFF) at fire training facilities and aircraft hangars. These AFFFs have...contaminated approximately 600 sites classified as fire training facilities with PFAS (Huang, 2013). This study focused on testing the most likely

  15. Test Results for a Non-toxic, Dual Thrust Reaction Control Engine

    NASA Technical Reports Server (NTRS)

    Robinson, Philip J.; Veith, Eric M.; Turpin, Alicia A.

    2005-01-01

    A non-toxic, dual thrust reaction control engine (RCE) was successfully tested over a broad range of operating conditions at the Aerojet Sacramento facility. The RCE utilized LOX/Ethanol propellants; and was tested in steady state and pulsing modes at 25-lbf thrust (vernier) and at 870-lbf thrust (primary). Steady state vernier tests vaned chamber pressure (Pc) from 0.78 to 5.96 psia, and mixture ratio (MR) from 0.73 to 1.82, while primary steady state tests vaned Pc from 103 to 179 psia and MR from 1.33 to 1.76. Pulsing tests explored EPW from 0.080 to 10 seconds and DC from 5 to 50 percent at both thrust levels. Vernier testing accumulated a total of 6,670 seconds of firing time, and 7,215 pulses, and primary testing accumulated a total of 2,060 seconds of firing time and 3,646 pulses.

  16. KSC-2011-1063

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Workers hang artwork in the second-floor lobby of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. The artwork was produced by Greg Lee, a graphics specialist with Abacus Technology Corp., and features a silhouette of a shuttle, one of the most recognizable American icons, rolling out to Launch Complex 39. Next to the artwork are recycled firing room windows from Kennedy's Launch Control Center. Launch controllers viewed every shuttle rollout and launch through those windows before they were repurposed. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  17. Pipeline oil fire detection with MODIS active fire products

    NASA Astrophysics Data System (ADS)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  18. Review of Facility Technology Options and their Development Status

    DTIC Science & Technology

    1989-06-01

    added to these commercial technologies, such as flue gas desulfurization and low-NO x burners. " New coal-fired power technologies, such as AFBC, CFBC...Issues When compared to conventional technologies with pollution control equipment (such as pulverized coal/ flue gas desulfurization ), AFBC/CFBC systems...performance trade- offs exist. Since less energy is available in the flue gas as a result of heating water, less refrigerant vapor will be

  19. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  20. KSC-2011-1057

    NASA Image and Video Library

    2011-01-07

    CAPE CANAVERAL, Fla. -- Finishing touches adorn the second-floor lobby of the Propellants North Administrative and Maintenance Facility at NASA's Kennedy Space Center in Florida. At right, are recycled firing room windows that are set at the same angle and orientation as they were in Kennedy's Launch Control Center, looking out toward Launch Pads 39A and B. The environmentally friendly facility is slated to be NASA's second Platinum-rated by the U.S. Green Building Council's (USGBC) Leadership in Environmental and Energy Design (LEED) certification system. It will be the space agency's first net-zero facility, which means it will produce enough energy onsite from renewable sources to offset what it requires to operate. The facility consists of a two-story administrative building to house managers, mechanics and technicians who fuel spacecraft at Kennedy, and a single-story shop to store cryogenic fuel transfer equipment. Photo credit: NASA/Frankie Martin

  1. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  2. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  3. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  4. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  5. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  6. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  7. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  8. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  9. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  10. Radio frequency security system, method for a building facility or the like, and apparatus and methods for remotely monitoring the status of fire extinguishers

    DOEpatents

    Runyon, Larry [Richland, WA; Gunter, Wayne M [Richland, WA; Gilbert, Ronald W [Gilroy, CA

    2006-07-25

    A system for remotely monitoring the status of one or more fire extinguishers includes means for sensing at least one parameter of each of the fire extinguishers; means for selectively transmitting the sensed parameters along with information identifying the fire extinguishers from which the parameters were sensed; and means for receiving the sensed parameters and identifying information for the fire extinguisher or extinguishers at a common location. Other systems and methods for remotely monitoring the status of multiple fire extinguishers are also provided.

  11. 24 CFR 232.522 - Inspection fee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  12. 24 CFR 232.560 - Interest rate.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  13. 24 CFR 232.600 - Title evidence.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  14. Demonstration of coal reburning for cyclone boiler NO{sub x} control. Appendix, Book 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Based on the industry need for a pilot-scale cyclone boiler simulator, Babcock Wilcox (B&W) designed, fabricated, and installed such a facility at its Alliance Research Center (ARC) in 1985. The project involved conversion of an existing pulverized coal-fired facility to be cyclone-firing capable. Additionally, convective section tube banks were installed in the upper furnace in order to simulate a typical boiler convection pass. The small boiler simulator (SBS) is designed to simulate most fireside aspects of full-size utility boilers such as combustion and flue gas emissions characteristics, fireside deposition, etc. Prior to the design of the pilot-scale cyclone boiler simulator,more » the various cyclone boiler types were reviewed in order to identify the inherent cyclone boiler design characteristics which are applicable to the majority of these boilers. The cyclone boiler characteristics that were reviewed include NO{sub x} emissions, furnace exit gas temperature (FEGT) carbon loss, and total furnace residence time. Previous pilot-scale cyclone-fired furnace experience identified the following concerns: (1) Operability of a small cyclone furnace (e.g., continuous slag tapping capability). (2) The optimum cyclone(s) configuration for the pilot-scale unit. (3) Compatibility of NO{sub x} levels, carbon burnout, cyclone ash carryover to the convection pass, cyclone temperature, furnace residence time, and FEGT.« less

  15. The local impact of a coal-fired power plant on inorganic mercury and methyl-mercury distribution in rice (Oryza sativa L.).

    PubMed

    Xu, Xiaohang; Meng, Bo; Zhang, Chao; Feng, Xinbin; Gu, Chunhao; Guo, Jianyang; Bishop, Kevin; Xu, Zhidong; Zhang, Sensen; Qiu, Guangle

    2017-04-01

    Emission from coal-fired power plants is one of the major anthropogenic sources of mercury (Hg) in the environment, because emitted Hg can be quickly deposited nearby the source, attention is paid to the effects of coal-burning facilities on levels of toxic methyl-mercury (MeHg) in biota near such sources. Since rice is an agricultural crop that can bio-accumulate MeHg, the potential effects of a large Hg-emitting coal-fired power plant in Hunan Province, China on both inorganic Hg (Hg(II)) and MeHg distributions in rice was investigated. Relatively high MeHg (up to 3.8 μg kg -1 ) and Hg(II) (up to 22 μg kg -1 ) concentrations were observed in rice samples collected adjacent to the plant, suggesting a potential impact of Hg emission from the coal fired power plant on the accumulation of Hg in rice in the area. Concentrations of MeHg in rice were positively correlated with soil MeHg, soil S, and gaseous elemental Hg (GEM) in ambient air. Soil MeHg was the most important factor controlling MeHg concentrations in rice. The methylation of Hg in soils may be controlled by factors such as the chemical speciation of inorganic Hg, soil S, and ambient GEM. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Space Station Freedom combustion research

    NASA Technical Reports Server (NTRS)

    Faeth, G. M.

    1992-01-01

    Extended operations in microgravity, on board spacecraft like Space Station Freedom, provide both unusual opportunities and unusual challenges for combustion science. On the one hand, eliminating the intrusion of buoyancy provides a valuable new perspective for fundamental studies of combustion phenomena. On the other hand, however, the absence of buoyancy creates new hazards of fires and explosions that must be understood to assure safe manned space activities. These considerations - and the relevance of combustion science to problems of pollutants, energy utilization, waste incineration, power and propulsion systems, and fire and explosion hazards, among others - provide strong motivation for microgravity combustion research. The intrusion of buoyancy is a greater impediment to fundamental combustion studies than to most other areas of science. Combustion intrinsically heats gases with the resulting buoyant motion at normal gravity either preventing or vastly complicating measurements. Perversely, this limitation is most evident for fundamental laboratory experiments; few practical combustion phenomena are significantly affected by buoyancy. Thus, we have never observed the most fundamental combustion phenomena - laminar premixed and diffusion flames, heterogeneous flames of particles and surfaces, low-speed turbulent flames, etc. - without substantial buoyant disturbances. This precludes rational merging of theory, where buoyancy is of little interest, and experiments, that always are contaminated by buoyancy, which is the traditional path for developing most areas of science. The current microgravity combustion program seeks to rectify this deficiency using both ground-based and space-based facilities, with experiments involving space-based facilities including: laminar premixed flames, soot processes in laminar jet diffusion flames, structure of laminar and turbulent jet diffusion flames, solid surface combustion, one-dimensional smoldering, ignition and flame spread of liquids, drop combustion, and quenching of panicle-air flames. Unfortunately, the same features that make microgravity attractive for fundamental combustion experiments, introduce new fire and explosion hazards that have no counterpart on earth. For example, microgravity can cause broader flammability limits, novel regimes of flame spread, enhanced effects of flame radiation, slower fire detector response, and enhanced combustion upon injecting fire extinguishing agents, among others. On the other hand, spacecraft provide an opportunity to use 'fire-safe' atmospheres due to their controlled environment. Investigation of these problems is just beginning, with specific fire safety experiments supplementing the space based fundamental experiments listed earlier; thus, much remains to be done to develop an adequate technology base for fire and explosion safety considerations for spacecraft.

  17. Fire/security staff member instructs STS-29 crew on fire extinguisher usage

    NASA Image and Video Library

    1988-12-06

    S88-54948 (6 Dec 1988) --- The STS-29 crewmembers are trained in procedures to follow in the event of a fire with their spacecraft. Here, the crew is briefed on correct handling of the fire extinguisher by Robert Fife (far left) of NASA's fire and security staff. Pictured, left to right, are Astronauts John E. Blaha, pilot; Michael L. Coats, mission commander; Robert C. Springer, James F. Buchli and James P. Bagian, mission specialists. The training exercise took place on the northern end of the 1625-acre JSC facility.

  18. FGC Webinar: From Fires to Floods and Everything In Between

    EPA Pesticide Factsheets

    Federal Green Challenge presentations from the April 2018 'Billion Dollar Weather Events' webinar From Fires to Floods and Everything in Between: How Federal Facilities Can Thrive in an Era of Billion Dollar Weather Events.

  19. Post-fire environments are favourable for plant functioning of seeder and resprouter Mediterranean shrubs, even under drought.

    PubMed

    Parra, Antonio; Moreno, José M

    2017-05-01

    Understanding how drought affects seeder and resprouter plants during post-fire regeneration is important for the anticipation of Mediterranean vegetation vulnerability in a context of increasing drought and fire caused by climate change. A Mediterranean shrubland was subjected to various drought treatments (including 45% rainfall reduction, 7 months drought yr -1 ), before and after experimental burning, by means of a rainout-shelter system with an irrigation facility. Predawn shoot water potential (Ψ pd ), relative growth rate (RGR), specific leaf area (SLA) and bulk leaf carbon isotopic composition (δ 13 C) were monitored in the main woody species during the first 3 yr after fire. Cistus ladanifer seedlings showed higher Ψ pd , RGR and SLA, and lower δ 13 C, than unburned plants during the first two post-fire years. Seedlings under drought maintained relatively high Ψ pd , but suffered a decrease in Ψ pd and RGR, and an increase in δ 13 C, relative to control treatments. Erica arborea, E. scoparia and Phillyrea angustifolia resprouts had higher Ψ pd and RGR than unburned plants during the first post-fire year. Resprouters were largely unaffected by drought. Overall, despite marked differences between the two functional groups, post-fire environments were favourable for plant functioning of both seeder and resprouter shrubs, even under the most severe drought conditions implemented. © 2017 The Authors. New Phytologist © 2017 New Phytologist Trust.

  20. Elevated Blood Lead Levels Among Fire Assay Workers and Their Children in Alaska, 2010–2011

    PubMed Central

    Kirk, Cassandra; Fearey, Donna; Castrodale, Louisa J.; Verbrugge, David; McLaughlin, Joseph

    2015-01-01

    In October 2010, an employee at Facility A in Alaska that performs fire assay analysis, an industrial technique that uses lead-containing flux to obtain metals from pulverized rocks, was reported to the Alaska Section of Epidemiology (SOE) with an elevated blood lead level (BLL) ≥10 micrograms per deciliter (μg/dL). The SOE initiated an investigation; investigators interviewed employees, offered blood lead screening to employees and their families, and observed a visit to the industrial facility by the Alaska Occupational Safety and Health Section (AKOSH). Among the 15 employees with known work responsibilities, 12 had an elevated BLL at least once from October 2010 through February 2011. Of these 12 employees, 10 reported working in the fire assay room. Four children of employees had BLLs ≥5 μg/dL. Employees working in Facility A's fire assay room were likely exposed to lead at work and could have brought lead home. AKOSH inspectors reported that they could not share their consultative report with SOE investigators because of the confidentiality requirements of a federal regulation, which hampered Alaska SOE investigators from fully characterizing the lead exposure standards. PMID:26327721

  1. Elevated Blood Lead Levels Among Fire Assay Workers and Their Children in Alaska, 2010-2011.

    PubMed

    Porter, Kimberly A; Kirk, Cassandra; Fearey, Donna; Castrodale, Louisa J; Verbrugge, David; McLaughlin, Joseph

    2015-01-01

    In October 2010, an employee at Facility A in Alaska that performs fire assay analysis, an industrial technique that uses lead-containing flux to obtain metals from pulverized rocks, was reported to the Alaska Section of Epidemiology (SOE) with an elevated blood lead level (BLL) ≥10 micrograms per deciliter (μg/dL). The SOE initiated an investigation; investigators interviewed employees, offered blood lead screening to employees and their families, and observed a visit to the industrial facility by the Alaska Occupational Safety and Health Section (AKOSH). Among the 15 employees with known work responsibilities, 12 had an elevated BLL at least once from October 2010 through February 2011. Of these 12 employees, 10 reported working in the fire assay room. Four children of employees had BLLs ≥5 μg/dL. Employees working in Facility A's fire assay room were likely exposed to lead at work and could have brought lead home. AKOSH inspectors reported that they could not share their consultative report with SOE investigators because of the confidentiality requirements of a federal regulation, which hampered Alaska SOE investigators from fully characterizing the lead exposure standards.

  2. Final Environmental Assessment For the Construction and Operation of a Fire Training Facility

    DTIC Science & Technology

    2010-04-29

    practice drafting (i.e., water uptake through hoses ) operations during live fires. The proposed drafting pit would also allow the department to...FTF to allow the Clear FD to practice drafting (i.e., water uptake through hoses ) operations during live fires. The proposed drafting pit would also...respirators, etc.), but trucks, hoses , and other large equipment would need to be supplied by the host fire department (so as not to leave Clear AFS

  3. Honey Lake Power Facility under construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-12-01

    Geothermal energy and wood waste are primary energy sources for the 30 megawatt, net, Honey Lake Power Facility, a cogeneration power plant. The facility 60% completed in January 1989, will use 1,300 tons per day of fuel obtained from selective forest thinnings and from logging residue combined with mill wastes. The power plant will be the largest industrial facility to use some of Lassen County's geothermal resources. The facility will produce 236 million kilowatt-hours of electricity annually. The plant consists of a wood-fired traveling grate furnace with a utility-type high pressure boiler. Fluids from a geothermal well will pass throughmore » a heat exchange to preheat boiler feedwater. Used geothermal fluid will be disposed of in an injection well. Steam will be converted to electrical power through a 35.5-megawatt turbine generator and transmitted 22 miles to Susanville over company-owned and maintained transmission lines. The plant includes pollution control for particulate removal, ammonia injection for removal of nitrogen oxides, and computer-controlled combustion systems to control carbon monoxide and hydrocarbons. The highly automated wood yard consists of systems to remove metal, handle oversized material, receive up to six truck loads of wood products per hour, and continuously deliver 58 tons per hour of fuel through redundant systems to ensure maximum on-line performance. The plant is scheduled to become operational in mid-1989.« less

  4. An atmosphere protection subsystem in the thermal power station automated process control system

    NASA Astrophysics Data System (ADS)

    Parchevskii, V. M.; Kislov, E. A.

    2014-03-01

    Matters concerned with development of methodical and mathematical support for an atmosphere protection subsystem in the thermal power station automated process control system are considered taking as an example the problem of controlling nitrogen oxide emissions at a gas-and-oil-fired thermal power station. The combined environmental-and-economic characteristics of boilers, which correlate the costs for suppressing emissions with the boiler steam load and mass discharge of nitrogen oxides in analytic form, are used as the main tool for optimal control. A procedure for constructing and applying environmental-and-economic characteristics on the basis of technical facilities available in modern instrumentation and control systems is presented.

  5. Cockrell and Rominger go through de-orbit preparations in the flight deck

    NASA Image and Video Library

    1996-12-06

    STS080-360-002 (19 Nov.-7 Dec. 1996) --- From the commander's station on the port side of the space shuttle Columbia's forward flight deck, astronaut Kenneth D. Cockrell prepares for a minor firing of Reaction Control System (RCS) engines during operations with the Wake Shield Facility (WSF). The activity was recorded with a 35mm camera on flight day seven. The commander is attired in a liquid-cooled biological garment.

  6. Facilities Maintenance in the U.S. Navy

    DTIC Science & Technology

    1986-01-01

    Row’a9IVI s..Nl,I I~de 14. 11111116104 It. safeI MeAI. 5,124 AN (:lgnd) JOHN SMITH I765 IIf Figure 111-1 Work Request is EMIROENCY/SERVICE WORK...Eliminate fire, health and active life of less than 3 years safety hazards o Infrequently or only partially o Patch and reinforce instead used of...safety or health hazards and to permit reactivation within the period prescribed under mobili- zation plans o Surplus facilities a Fliminate fire, safety

  7. Small-diameter timber alchemy: can utilization pay the way toward fire-resistant forests

    Treesearch

    Jeremy S. Fried; R. Jamie Barbour; Roger D. Fight; Glenn Christensen; Guy Pinjuv

    2008-01-01

    There is growing interest in using biomass removed from hazardous fuels reduction treatments in wood-fired electrical generation facilities. An application of FIA BioSum to southwest Oregon’s Klamath ecoregion assessed the financial feasibility of fuel treatment and biomass generation under a range of product prices and fire hazard-motivated silvicultural prescriptions...

  8. Military Housing Inspection-Camp Buehring, Kuwait

    DTIC Science & Technology

    2016-09-30

    General DPW Director Public Works FAS Fire Alarm System HVAC Heating, Ventilation, and Air Conditioning IAW In Accordance With ITM Inspection...safety policies and standards regarding electrical and fire protection systems . Findings We found significant deficiencies in electrical and fire...protection systems during the physical inspections of the U.S. military-occupied facilities at Camp Buehring. We identified a total of 538

  9. Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2009-06-01

    The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclearmore » Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.« less

  10. 17. VIEW OF EQUIPMENT BURNED IN A TITANIUM FIRE. (11/13/89) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. VIEW OF EQUIPMENT BURNED IN A TITANIUM FIRE. (11/13/89) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  11. 49 CFR 193.2611 - Fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Fire protection. 193.2611 Section 193.2611 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  12. Guide for Oxygen Compatibility Assessments on Oxygen Components and Systems

    NASA Technical Reports Server (NTRS)

    Rosales, Keisa R.; Shoffstall, Michael S.; Stoltzfus, Joel M.

    2007-01-01

    Understanding and preventing fire hazards is necessary when designing, maintaining, and operating oxygen systems. Ignition risks can be minimized by controlling heat sources and using materials that will not ignite or will not support burning in the end-use environment. Because certain materials are more susceptible to ignition in oxygen-enriched environments, a compatibility assessment should be performed before the component is introduced into an oxygen system. This document provides an overview of oxygen fire hazards and procedures that are consistent with the latest versions of American Society for Testing and Materials (ASTM) Standards G63 (1999) and G94 (2005) to address fire hazards associated with oxygen systems. This document supersedes the previous edition, NASA Technical Memorandum 104823, Guide for Oxygen Hazards Analyses on Components and Systems (1996). The step-by-step oxygen compatibility assessment method described herein (see Section 4) enables oxygen-system designers, system engineers, and facility managers to determine areas of concern with respect to oxygen compatibility and, ultimately, prevent damage to a system or injury to personnel.

  13. Kuwaiti reconstruction project unprecedented in size, complexity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tippee, B.

    1993-03-15

    There had been no challenge like it: a desert emirate ablaze; its main city sacked; the economically crucial oil industry devastated; countryside shrouded in smoke from oil well fires and littered with unexploded ordnance, disabled military equipment, and unignited crude oil. Like the well-documented effort that brought 749 burning wells under control in less than 7 months, Kuwaiti reconstruction had no precedent. Unlike the firefight, reconstruction is no-where complete. It nevertheless has placed two of three refineries back on stream, restored oil production to preinvasion levels, and repaired or rebuilt 17 of 26 oil field gathering stations. Most of themore » progress has come since the last well fire went out on Nov. 6, 1991. Expatriates in Kuwait since the days of Al-Awda- the return,' in Arabic- attribute much of the rapid progress under Al-Tameer- the reconstruction'- to decisions and preparations made while the well fires still raged. The article describes the planning for Al-Awda, reentering the country, drilling plans, facilities reconstruction, and special problems.« less

  14. Special report. Revising your fire safety plans.

    PubMed

    1993-12-01

    Every hospital has a fire safety plan, although some fail to update their plans when circumstances change, such as when the facility is refurbished or new fire protection equipment is added, or when new wings bring in additional patients and staff. Others may fail to develop new education programs to heighten staff awareness of what is expected of them during a fire and to train employees to meet those expectations. In this report, we'll examine the new fire safety plans at two Massachusetts hospitals and the revisions they made to address these issues. We'll offer suggestions for effectively evaluating and revising your own fire safety plans.

  15. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  16. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  17. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  18. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  19. A new website with real-time dissemination of information on fire activity and meteorological fire danger in Portugal

    NASA Astrophysics Data System (ADS)

    DaCamara, Carlos; Trigo, Ricardo; Nunes, Sílvia; Pinto, Miguel; Oliveira, Tiago; Almeida, Rui

    2017-04-01

    In Portugal, like in Mediterranean Europe, fire activity is a natural phenomenon linking climate, humans and vegetation and is therefore conditioned by natural and anthropogenic factors. Natural factors include topography, vegetation cover and prevailing weather conditions whereas anthropogenic factors encompass land management practices and fire prevention policies. Land management practices, in particular the inadequate use of fire, is a crucial anthropogenic factor that accounts for about 90% of fire ignitions. Fire prevention policies require adequate and timely information about wildfire potential assessment, which is usually based on fire danger rating systems that provide indices to be used on an operational and tactical basis in decision support systems. We present a new website designed to provide the user community with relevant real-time information on fire activity and meteorological fire danger that will allow adopting the adequate measures to mitigate fire damage. The fire danger product consists of forecasts of fire danger over Portugal based on a statistical procedure that combines information about fire history derived from the Fire Radiative Power product disseminated by the Land Surface Analysis Satellite Application Facility (LSA SAF) with daily meteorological forecasts provided by the European Centre for Medium-Range Weather Forecasts (ECMWF). The aim of the website is fourfold; 1) to concentrate all information available (databases and maps) relevant to fire management in a unique platform so that access by end users becomes easier, faster and friendlier; 2) to supervise the access of users to the different products available; 3) to control and assist the access to the platform and obtain feedbacks from users for further improvements; 4) to outreach the operational community and foster the use of better information that increase efficiency in risk management. The website is sponsored by The Navigator Company, a leading force in the global pulp and paper market. Since the operational start of the website, the number of registered users has been steadily increasing up to a total of 300 users from a wide community that encompasses forest managers, firemen and civil protection officers, personnel from municipalities, academic researchers and private owners.

  20. Figures of Merit for Aeronautics Programs and Addition to NASA LARC Fire Station

    NASA Technical Reports Server (NTRS)

    Harper, Belinda M.

    1995-01-01

    This report accounts details of two research projects for the Langley Aerospace Research Summer Scholars (LARSS) program. The first project, with the Office of Mission Assurance, involved subjectively predicting the probable success of two aeronautics programs by means of a tool called a Figure of Merit. The figure of merit bases program success on the quality and reliability of the following factors: parts, complexity of research, quality programs, hazards elimination, and single point failures elimination. The second project, for the Office of Safety and Facilities Assurance, required planning, layouts, and source seeking for an addition to the fire house. Forecasted changes in facility layout necessitate this addition which will serve as housing for the fire fighters.

  1. Medicare and Medicaid programs; fire safety requirements for long term care facilities, automatic sprinkler systems. Final rule.

    PubMed

    2008-08-13

    This final rule requires all long term care facilities to be equipped with sprinkler systems by August 13, 2013. Additionally, this final rule requires affected facilities to maintain their automatic sprinkler systems once they are installed.

  2. KSC-2010-5737

    NASA Image and Video Library

    2010-11-24

    CAPE CANAVERAL, Fla. -- The finishing touches of the Propellants North Administrative and Maintenance Facility begin to take place at NASA's Kennedy Space Center in Florida. Inside the green facility is window glazing and framing from the iconic firing rooms of Kennedy's Launch Control Center (LCC). The windows are set at the same orientation and angle as they were in the LCC, looking out toward Launch Complex 39. The facility also features sustainable flooring made of polished concrete and laminated bamboo, as well as a high-efficiency roof and walls. This is the facility's two-story administrative building, which will house managers, mechanics and technicians who fuel spacecraft at Kennedy. Next door is a single-story shop that will be used to store cryogenic fuel transfer equipment. The facility is striving to qualify for the U.S. Green Building Council’s Leadership in Energy and Environmental Design (LEED) Platinum certification, which is the highest of LEED ratings. The facility, set to be complete in December 2010, was designed for NASA by Jones Edmunds and Associates. H. W. Davis Construction is the construction contractor. Photo credit: NASA/Frankie Martin

  3. Goals and strategies in the global control design of the OAJ Robotic Observatory

    NASA Astrophysics Data System (ADS)

    Yanes-Díaz, A.; Rueda-Teruel, S.; Antón, J. L.; Rueda-Teruel, F.; Moles, M.; Cenarro, A. J.; Marín-Franch, A.; Ederoclite, A.; Gruel, N.; Varela, J.; Cristóbal-Hornillos, D.; Chueca, S.; Díaz-Martín, M. C.; Guillén, L.; Luis-Simoes, R.; Maícas, N.; Lamadrid, J. L.; López-Sainz, A.; Hernández-Fuertes, J.; Valdivielso, L.; Mendes de Oliveira, C.; Penteado, P.; Schoenell, W.; Kanaan, A.

    2012-09-01

    There are many ways to solve the challenging problem of making a high performance robotic observatory from scratch. The Observatorio Astrofísico de Javalambre (OAJ) is a new astronomical facility located in the Sierra de Javalambre (Teruel, Spain) whose primary role will be to conduct all-sky astronomical surveys. The OAJ control system has been designed from a global point of view including astronomical subsystems as well as infrastructures and other facilities. Three main factors have been considered in the design of a global control system for the robotic OAJ: quality, reliability and efficiency. We propose CIA (Control Integrated Architecture) design and OEE (Overall Equipment Effectiveness) as a key performance indicator in order to improve operation processes, minimizing resources and obtaining high cost reduction whilst maintaining quality requirements. The OAJ subsystems considered for the control integrated architecture are the following: two wide-field telescopes and their instrumentation, active optics subsystems, facilities for sky quality monitoring (seeing, extinction, sky background, sky brightness, cloud distribution, meteorological station), domes and several infrastructure facilities such as water supply, glycol water, water treatment plant, air conditioning, compressed air, LN2 plant, illumination, surveillance, access control, fire suppression, electrical generators, electrical distribution, electrical consumption, communication network, Uninterruptible Power Supply and two main control rooms, one at the OAJ and the other remotely located in Teruel, 40km from the observatory, connected through a microwave radio-link. This paper presents the OAJ strategy in control design to achieve maximum quality efficiency for the observatory processes and operations, giving practical examples of our approach.

  4. 24 CFR 232.615 - Eligible borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... intermediate care facility for which the Secretary of Health and Human Services has determined that the... intermediate care facility will meet not only the applicable fire safety requirements of HHS but will meet... application, a nursing home or intermediate care facility need not be providing such services if upon...

  5. Forwardly-placed firearm fire control assembly

    DOEpatents

    Frickey, Steven J.

    2001-12-22

    A firearm fire control assembly for disposition in a forwardly placed support-hand operative relationship within a firearm having a combination of a firing pin and a firearm hammer adapted to engage and fire a cartridge, a sear assembly to alternately engage and disengage the combination of the firearm hammer and firing pin, and a trigger assembly including a movable trigger mechanism that is operable to engage the sear assembly to cause the firearm hammer firing pin combination to fire the firearm, a fire control assembly including a fire control depression member and a fire control rod operably connected to the depression member, and being positioned in a forward disposition disposed within a forestock of the firearm, and the depression member adapted to be operably engaged and depressed by the user's conventional forwardly placed support hand to maneuver the fire control rod to provide firing control of the firing of the firearm.

  6. Counting the cost of false alarms.

    PubMed

    2013-05-01

    While fire and rescue service personnel, the Government, those responsible for fire safety in the healthcare sector, the Health and Safety Executive, fire and rescue services, and indeed fire alarm and detection equipment manufacturers, must be pleased that the number of false fire alarms continues to fall, fire services still attended just under 585,000 fires or false alarm incidents across Great Britain in 2011/12. Of this total, 272,000 were actual fires, of which around 24,000 were in premises classified by the Department for Communities and Local Government (DCLG) as 'other buildings', i.e. not 'dwellings', a category that includes healthcare facilities (representing a 4% fall on 2010-2011). HEJ looks behind the statistics, and at the possibility that some fire services could, in future, charge healthcare providers that persistently report incidents that turn out to be false alarms.

  7. Fire Control Agent Effectiveness for Hazardous Chemical Fires: Carbon Disulfide.

    DTIC Science & Technology

    1981-01-01

    Fires..................................... 46 12. AFFF Fire Control Data for Carbon Disulfide Fires............................. 47 13. Extinguishment...Disulfide and Hexane Fires ....... 67 22. Comparison of AFFF Fire Control Times for Carbon Disulfide and Hexane Fires ................... 68 23. Comparison of...Data .............. 27 2. Summary of Fluoroprotein Foam Fire Test Data ....... 28 3. Summary of AFFF Fire Test Data ..................... 29 4. Summary

  8. High Pressure Industrial Water Facility

    NASA Technical Reports Server (NTRS)

    1992-01-01

    In conjunction with Space Shuttle Main Engine testing at Stennis, the Nordberg Water Pumps at the High Pressure Industrial Water Facility provide water for cooling the flame deflectors at the test stands during test firings.

  9. 30 CFR 57.4430 - Surface storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....4430 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention... ignition sources to prevent fire or explosion; and (4) Vented or otherwise constructed to prevent...

  10. 30 CFR 56.4430 - Storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and... separated from ignition sources to prevent fire or explosion; and (4) Vented or otherwise constructed to...

  11. Evaluation of Modern Navies’ Damage Control and Firefighting Training using Simulator Platforms

    DTIC Science & Technology

    2011-09-01

    Figure 18 below is a two-story concrete structure including holes in bulkheads, ruptured pipelines, and almost all situations that can cause flooding...the four simulators address Class A, B, and C fires. The first one—the “Basic Firefighting Trainer”—is a single-story concrete structure with four...Figure 19—is a three-story concrete structure that houses berthing facilities, engine rooms, storage compartments and electrical and engine room mock

  12. Construction of Open Burning Facility Moody Air Force Base, Georgia Environmental Assessment and Finding of No Significant Impact

    DTIC Science & Technology

    2009-01-01

    are smaller and more leathery, and the leaf canopy is less dense. The trees commonly found in the southeastern United States are pines ( Pinus spp...during periods of extreme drought . These periodic fires maintained the pine subclimax forest by controlling hardwood competition, encouraged the growth...cinnamomea), chain fern (Woodwardia virginica), and greenbrier (Smilax spp). In the transition areas from wetlands to uplands, pond pine ( Pinus serotina

  13. Long-term post-fire effects on spatial ecology and reproductive output of female Agassiz’s desert tortoises (Gopherus agassizii) at a wind energy facility near Palm Springs, California, USA

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Ennen, Joshua R.; Madrak, Sheila V.; Loughran, Caleb L.; Meyer, Katherin P.; Arundel, Terence R.; Bjurlin, Curtis D.

    2011-01-01

    We studied the long-term response of a cohort of eight female Agassiz’s desert tortoises (Gopherus agassizii) during the first 15 years following a large fire at a wind energy generation facility near Palm Springs, California, USA. The fire burned a significant portion of the study site in 1995. Tortoise activity areas were mapped using minimum convex polygons for a proximate post-fire interval from 1997 to 2000, and a long-term post-fire interval from 2009 to 2010. In addition, we measured the annual reproductive output of eggs each year and monitored the body condition of tortoises over time. One adult female tortoise was killed by the fire and five tortoises bore exposure scars that were not fatal. Despite predictions that tortoises would make the short-distance movements from burned to nearby unburned habitats, most activity areas and their centroids remained in burned areas for the duration of the study. The percentage of activity area burned did not differ significantly between the two monitoring periods. Annual reproductive output and measures of body condition remained statistically similar throughout the monitoring period. Despite changes in plant composition, conditions at this site appeared to be suitable for survival of tortoises following a major fire. High productivity at the site may have buffered tortoises from the adverse impacts of fire if they were not killed outright. Tortoise populations at less productive desert sites may not have adequate resources to sustain normal activity areas, reproductive output, and body conditions following fire.

  14. Fires at storage sites of organic materials, waste fuels and recyclables.

    PubMed

    Ibrahim, Muhammad Asim; Alriksson, Stina; Kaczala, Fabio; Hogland, William

    2013-09-01

    During the last decade, the European Union has enforced the diversion of organic wastes and recyclables to waste management companies operating incineration plants, composting plants and recycling units instead of landfills. The temporary storage sites have been established as a buffer against fluctuations in energy demand throughout the year. Materials also need to be stored at temporary storage sites before recovery and recycling. However, regulations governing waste fuel storage and handling have not yet been developed, and, as a result, companies have engaged in risky practices that have resulted in a high number of fire incidents. In this study, a questionnaire survey was distributed to 249 of the 400 members of Avfall Sverige (Swedish Waste Management Association), which represents the waste management of 95% of the Swedish population. Information regarding 122 storage facilities owned by 69 companies was obtained; these facilities were responsible for the storage of 47% of the total treated waste (incineration + digestion + composting) in 2010 in Sweden. To identify factors related to fire frequency, the questionnaire covered the amounts of material handled and burnt per year, financial losses due to fires, storage duration, storage method and types of waste. The results show that 217 fire incidents corresponded to 170 kilotonnes of material burnt and cumulative losses of 49 million SEK (€4.3 million). Fire frequency and amount of material burnt per fire was found to be dependent upon type of management group (waste operator). Moreover, a correlation was found between fire frequency and material recycled during past years. Further investigations of financial aspects and externalities of fire incidents are recommended.

  15. Electronic firing systems and methods for firing a device

    DOEpatents

    Frickey, Steven J [Boise, ID; Svoboda, John M [Idaho Falls, ID

    2012-04-24

    An electronic firing system comprising a control system, a charging system, an electrical energy storage device, a shock tube firing circuit, a shock tube connector, a blasting cap firing circuit, and a blasting cap connector. The control system controls the charging system, which charges the electrical energy storage device. The control system also controls the shock tube firing circuit and the blasting cap firing circuit. When desired, the control system signals the shock tube firing circuit or blasting cap firing circuit to electrically connect the electrical energy storage device to the shock tube connector or the blasting cap connector respectively.

  16. Risk management of liquefied natural gas installations

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De C.

    1976-01-01

    In connection with the construction of four major liquefied natural gas (LNG) facilities in New York City, the New York City Fire Commissioner has asked NASA for assistance. It was decided that the Kennedy Space Center should develop a risk management system (RMS) for the use of the New York Fire Department (NYFD). The RMS provides for a published set of safety regulations by the NYFD. A description of the RMS is presented as an example of an application of aerospace technology to a civilian sector, namely LNG facilities.

  17. THE CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-07-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysismore » production was completed to produce lignin for co-fire testing. During this quarter, TVA completed the washing and dewatering of the lignin material produced from the MSW hydrolysis. Seven drums of lignin material were washed to recover the acid and sugar from the lignin and provide an improved fuel for steam generation. Samples of both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation. After sample evaluation, EERC approved sending the material and all of the necessary fuel for testing was shipped to EERC. EERC has requested and will receive coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio based fuels is scheduled to begin in August of 2001. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam. The preliminary steam price will be determined in the next quarter.« less

  18. Secondary Fire Analysis.

    DTIC Science & Technology

    1981-09-01

    of wood frame and brick veneer, slab on grade construction), killed 33, injured more than 1,000, derailed a train, destroyed 4,000 cars, uprooted most... of a nuclear detonation) in or near structures, with emphasis on critical facil- ities and industries. Assessment of the potential for secondary fires...and/or 517 East Dayshore, Redwood City, CA 94063 DistI pial (DETACHABLE SUMMARY) SECONDARY FIRE ANALYSIS This report presents the results of a

  19. UNC Pembroke Laser Scanning Confocal Microscopy Facility

    DTIC Science & Technology

    2016-04-29

    cultures. INVASIVE FIRE ANTS Professor Lisa Kelly of UNC Pembroke has been trained on the new confocal system. Dr. Kelly’s research...interest in the trophic ecology of the invasive fire ant has begun to benefit from the wide field view and long working distances of a confocal imaging...of protein clearance pathways in living brain tissue cultures. INVASIVE FIRE ANTS Professor Lisa Kelly of UNC Pembroke has been trained on

  20. 75 FR 2481 - Sunshine Act; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... installation and commissioning of a new gas-fired industrial water heater, manufactured by Energy Systems... its investigation into a natural gas explosion that occurred at the ConAgra production facility in... consider urgent recommendations to the National Fire Protection Association (NFPA), the American Gas...

  1. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  2. 24 CFR 232.570 - Endorsement of credit instrument.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Eligible Security Instruments § 232.570 Endorsement of credit instrument.... (c) Statement by the Secretary of Health and Human Services that the fire safety equipment noted in...

  3. NASA Conducts First RS-25 Rocket Engine Test of 2015

    NASA Image and Video Library

    2015-01-09

    From the Press Release: The new year is off to a hot start for NASA's Space Launch System (SLS). The engine that will drive America's next great rocket to deep space blazed through its first successful test Jan. 9 at the agency's Stennis Space Center near Bay St. Louis, Mississippi. The RS-25, formerly the space shuttle main engine, fired up for 500 seconds on the A-1 test stand at Stennis, providing NASA engineers critical data on the engine controller unit and inlet pressure conditions. This is the first hot fire of an RS-25 engine since the end of space shuttle main engine testing in 2009. Four RS-25 engines will power SLS on future missions, including to an asteroid and Mars. "We’ve made modifications to the RS-25 to meet SLS specifications and will analyze and test a variety of conditions during the hot fire series,” said Steve Wofford, manager of the SLS Liquid Engines Office at NASA's Marshall Space Flight Center in Huntsville, Alabama, where the SLS Program is managed. "The engines for SLS will encounter colder liquid oxygen temperatures than shuttle; greater inlet pressure due to the taller core stage liquid oxygen tank and higher vehicle acceleration; and more nozzle heating due to the four-engine configuration and their position in-plane with the SLS booster exhaust nozzles.” The engine controller unit, the "brain" of the engine, allows communication between the vehicle and the engine, relaying commands to the engine and transmitting data back to the vehicle. The controller also provides closed-loop management of the engine by regulating the thrust and fuel mixture ratio while monitoring the engine's health and status. The new controller will use updated hardware and software configured to operate with the new SLS avionics architecture. "This first hot-fire test of the RS-25 engine represents a significant effort on behalf of Stennis Space Center’s A-1 test team," said Ronald Rigney, RS-25 project manager at Stennis. "Our technicians and engineers have been working diligently to design, modify and activate an extremely complex and capable facility in support of RS-25 engine testing." Testing will resume in April after upgrades are completed on the high pressure industrial water system, which provides cool water for the test facility during a hot fire test. Eight tests, totaling 3,500 seconds, are planned for the current development engine. Another development engine later will undergo 10 tests, totaling 4,500 seconds. The second test series includes the first test of new flight controllers, known as green running. The first flight test of the SLS will feature a configuration for a 70-metric-ton (77-ton) lift capacity and carry an uncrewed Orion spacecraft beyond low-Earth orbit to test the performance of the integrated system. As the SLS is upgraded, it will provide an unprecedented lift capability of 130 metric tons (143 tons) to enable missions even farther into our solar system.

  4. Lewis Research Center's coal-fired, pressurized, fluidized-bed reactor test facility

    NASA Astrophysics Data System (ADS)

    Kobak, J. A.; Rollbuhler, R. J.

    1981-10-01

    A 200-kilowatt-thermal, pressurized, fluidized-bed (PFB) reactor, research test facility was designed, constructed, and operated as part of a NASA-funded project to assess and evaluate the effect of PFB hot-gas effluent on aircraft turbine engine materials that might have applications in stationary-power-plant turbogenerators. Some of the techniques and components developed for this PFB system are described. One of the more important items was the development of a two-in-one, gas-solids separator that removed 95+ percent of the solids in 1600 F to 1900 F gases. Another was a coal and sorbent feed and mixing system for injecting the fuel into the pressurized combustor. Also important were the controls and data-acquisition systems that enabled one person to operate the entire facility. The solid, liquid, and gas sub-systems all had problems that were solved over the 2-year operating time of the facility, which culminated in a 400-hour, hot-gas, turbine test.

  5. Lewis Research Center's coal-fired, pressurized, fluidized-bed reactor test facility

    NASA Technical Reports Server (NTRS)

    Kobak, J. A.; Rollbuhler, R. J.

    1981-01-01

    A 200-kilowatt-thermal, pressurized, fluidized-bed (PFB) reactor, research test facility was designed, constructed, and operated as part of a NASA-funded project to assess and evaluate the effect of PFB hot-gas effluent on aircraft turbine engine materials that might have applications in stationary-power-plant turbogenerators. Some of the techniques and components developed for this PFB system are described. One of the more important items was the development of a two-in-one, gas-solids separator that removed 95+ percent of the solids in 1600 F to 1900 F gases. Another was a coal and sorbent feed and mixing system for injecting the fuel into the pressurized combustor. Also important were the controls and data-acquisition systems that enabled one person to operate the entire facility. The solid, liquid, and gas sub-systems all had problems that were solved over the 2-year operating time of the facility, which culminated in a 400-hour, hot-gas, turbine test.

  6. Space Propulsion Research Facility (B-2): An Innovative, Multi-Purpose Test Facility

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Weaver, Harold F.; Kudlac, Maureen T.; Maloney, Christian T.; Evans, Richard K.

    2011-01-01

    The Space Propulsion Research Facility, commonly referred to as B-2, is designed to hot fire rocket engines or upper stage launch vehicles with up to 890,000 N force (200,000 lb force), after environmental conditioning of the test article in simulated thermal vacuum space environment. As NASA s third largest thermal vacuum facility, and the largest designed to store and transfer large quantities of propellant, it is uniquely suited to support developmental testing associated with large lightweight structures and Cryogenic Fluid Management (CFM) systems, as well as non-traditional propulsion test programs such as Electric and In-Space propulsion. B-2 has undergone refurbishment of key subsystems to support the NASA s future test needs, including data acquisition and controls, vacuum, and propellant systems. This paper details the modernization efforts at B-2 to support the Nation s thermal vacuum/propellant test capabilities, the unique design considerations implemented for efficient operations and maintenance, and ultimately to reduce test costs.

  7. Vulnerability Methodology and Protective Measures for Aircraft Fire and Explosion Hazards. Volume 2. Aircraft Engine Nacelle Fire Test Programs. Part 1. Fire Detection, Fire Extinguishment and Surface Ignition Studies

    DTIC Science & Technology

    1986-01-01

    by sensors in the test cell and sampled, digitized, averaged, and calibrated by the facility computer system. The data included flowrates calculated ...before the next test could be started. This required about 2 minutes. 6.4 Combat Damage Testing Appendix C contains calculations and analysis...were comparable (Figure 7-5). Agent quantities required per MIL-E-22285 were again calculated using the equations noted in paragraph 7.1.1. The

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattes, R.H.; Bacho, A.; Wade, L.V.

    The Lake Lynn Laboratory is a multipurpose mining research laboratory operated by the Bureau of Mines and located in Fairchance, Pa. It consists of both surface and underground facilities. The initial focus of the facility, scheduled for full operation in fall 1982, will be on the problems of fires and explosions in mines. The initial experimental explosion was fired on March 3, 1982. The intent of this document is to provide the reader with detailed information on the physical capabilities of the Lake Lynn Laboratory. Subsequent publications will focus on the capabilities of Lake Lynn as compared with those ofmore » other similar facilities worldwide, and a comparison of initial explosion test results realized at Lake Lynn and comparable results from the Bruceton Experimental Mines.« less

  9. United States Navy - Canadian forces solid state flight data recorder/crash position locator experiment on the B-720 controlled impact demonstration

    NASA Technical Reports Server (NTRS)

    Watters, D. M.

    1986-01-01

    The operation of a radio beacon position locator during and after the remotely controlled transport aircraft is discussed. The radio beacon transmission was actuated and was picked up by the Navy P-3A chase aircraft for a short time, after which reception was lost. The pilot reported that he received a signal on both 121.5 MHz and 243 MHz for a period of approximately 5 seconds. Five minutes after the crash a portable direction finding unit located on the roof of the NASA Dryden Flight Research Facility, 4 miles distant from the crash, was unable to pick up the beacon transmission. The fire crews started fighting the fires approximately 90 seconds after the time of impact. Navy personnel access to the crash site was allowed on the morning of December 2, 1984. Radio beacon locator was found resting top side up, 15 feet forward and 13 feet perpendicular from the tray location the starboard side of the aircraft. An immediate inspection indicated the airfoil suffered moderate fire damage with paint peeling but not intumescing. The visual marker strobe lamp housings were intact but extensively burned such that it was impossible to see if the lamps had survived. The airfoil suffered minor structural damage, with assorted dents, etc. The extended plunger on the ARU-21 release unit indicated that the pyrotechnic deployment system operated. The radio beacon base (tray) suffered some heat and fire damage, and was charred and blackened by smoke. The frangible switch in the nose survived and the switch in the belly was recovered and found to have actuated. It is assumed that this switch fired the ARU-21 squib. There were no other release switches installed in the normally open system in the aircraft.

  10. The great Chinese fire of 1987 - A view from space

    NASA Technical Reports Server (NTRS)

    Cahoon, Donald R., Jr.; Levine, Joel S.; Cofer, Wesley R., III; Miller, James E.; Minnis, Patrick; Tennille, Geoffrey M.; Yip, Tommy W.; Stocks, Brian J.; Heck, Patrick W.

    1991-01-01

    One of the largest forest fires ever recorded burned in the People's Republic of China (PRC) and the Soviet Union in May 1987. The fire covered over 1.0 million hectares in the PRC and almost 4 million hectares in the Soviet Union. The progress and areal extent of the fire were measured using satellite images analyzed in the imaging facilities at NASA-Langley and Forestry Canada. The analyses show the utility and value of satellite measurements to assess the areal extent and geographical distribution of fires, and have important implications for future measurements to be obtained from space platforms, such as the Earth Observing System.

  11. Surgical fires: a patient safety perspective.

    PubMed

    2006-02-01

    A surgical fire is a fire that occurs on or in a surgical patient. Such fires are rare--they occur in only an extremely small percentage of surgical cases. Nevertheless, the actual number of incidents that occur each year may surprise many healthcare professionals. ECRI estimates that 50 to 100 or more surgical fires occur each year in the United States alone. And such fires can have devastating consequences, not only for the patient, but also for the surgical staff and for the healthcare facility. Fortunately, through awareness of the hazards-and with emphasis placed on following safe practices-virtually all surgical fires can be prevented. Thus, it's important that surgical fire safety be incorporated into formal patient safety initiatives. In this article, we describe a few surgical fire patient safety initiatives that have been instituted in recent years. In addition, we describe in detail the causes of surgical fires and the preventive measures that are available for healthcare personnel to follow. In addition, we review how staff should respond in the event of a surgical fire.

  12. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  13. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  14. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  15. 77 FR 21595 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... must be one which, if proven, would entitle the requestor/petitioner to relief. A requestor/ petitioner..., and fire modeling calculations, have been performed to demonstrate that the performance-based... may include engineering evaluations, probabilistic safety assessments, and fire modeling calculations...

  16. 24 CFR 232.565 - Maximum loan amount.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Eligible Security Instruments § 232.565 Maximum loan amount. The principal amount of the loan shall not exceed the lower of the Commissioner's estimate of the cost of the fire safety...

  17. 24 CFR 232.630 - Assurance of completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Special Requirements § 232.630 Assurance of completion. If the property upon which the fire safety equipment is to be installed is subject to a mortgage insured or held by the...

  18. 30 CFR 77.1100 - Fire protection; training and organization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....1100 Section 77.1100 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF... facilities and equipment shall be provided commensurate with the potential fire hazards at each structure...

  19. Demonstration of SCR technology for the control of NOx emissions from high-sulfur coal-fired utility boilers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinton, W.S.; Maxwell, J.D.; Healy, E.C.

    1997-12-31

    This paper describes the completed Innovative Clean Coal Technology project which demonstrated SCR technology for reduction of flue gas NO{sub x} emissions from a utility boiler burning US high-sulfur coal. The project was sponsored by the US Department of Energy, managed and co-funded by Southern Company Services, Inc. on behalf of the Southern Company, and also co-funded by the Electric Power Research Institute and Ontario Hydro. The project was located at Gulf Power Company`s Plant Crist Unit 5 (a 75 MW tangentially-fired boiler burning US coals that had a sulfur content ranging from 2.5--2.9%), near Pensacola, Florida. The test programmore » was conducted for approximately two years to evaluate catalyst deactivation and other SCR operational effects. The SCR test facility had nine reactors: three 2.5 MW (5,000 scfm), and operated on low-dust flue gas. The reactors operated in parallel with commercially available SCR catalysts obtained from suppliers throughout the world. Long-term performance testing began in July 1993 and was completed in July 1995. A brief test facility description and the results of the project are presented in this paper.« less

  20. Combustion Module-2 Achieved Scientific Success on Shuttle Mission STS-107

    NASA Technical Reports Server (NTRS)

    Over, Ann P.

    2004-01-01

    The familiar teardrop shape of a candle is caused by hot, spent air rising and cool fresh air flowing behind it. This type of airflow obscures many of the fundamental processes of combustion and is an impediment to our understanding and modeling of key combustion controls used for manufacturing, transportation, fire safety, and pollution. Conducting experiments in the microgravity environment onboard the space shuttles eliminates these impediments. NASA Glenn Research Center's Combustion Module-2 (CM-2) and its three experiments successfully flew on STS-107/Columbia in the SPACEHAB module and provided the answers for many research questions. However, this research also opened up new questions. The CM-2 facility was the largest and most complex pressurized system ever flown by NASA and was a precursor to the Glenn Fluids and Combustion Facility planned to fly on the International Space Station. CM-2 operated three combustion experiments: Laminar Soot Processes (LSP), Structure of Flame Balls at Low Lewis-Number (SOFBALL), and Water Mist Fire Suppression Experiment (Mist). Although Columbia's mission ended in tragedy with the loss of her crew and much data, most of the CM-2 results were sent to the ground team during the mission.

  1. A Burning Plasma Experiment: the role of international collaboration

    NASA Astrophysics Data System (ADS)

    Prager, Stewart

    2003-04-01

    The world effort to develop fusion energy is at the threshold of a new stage in its research: the investigation of burning plasmas. A burning plasma is self-heated. The 100 million degree temperature of the plasma is maintained by the heat generated by the fusion reactions themselves, as occurs in burning stars. The fusion-generated alpha particles produce new physical phenomena that are strongly coupled together as a nonlinear complex system, posing a major plasma physics challenge. Two attractive options are being considered by the US fusion community as burning plasma facilities: the international ITER experiment and the US-based FIRE experiment. ITER (the International Thermonuclear Experimental Reactor) is a large, power-plant scale facility. It was conceived and designed by a partnership of the European Union, Japan, the Soviet Union, and the United States. At the completion of the first engineering design in 1998, the US discontinued its participation. FIRE (the Fusion Ignition Research Experiment) is a smaller, domestic facility that is at an advanced pre-conceptual design stage. Each facility has different scientific, programmatic and political implications. Selecting the optimal path for burning plasma science is itself a challenge. Recently, the Fusion Energy Sciences Advisory Committee recommended a dual path strategy in which the US seek to rejoin ITER, but be prepared to move forward with FIRE if the ITER negotiations do not reach fruition by July, 2004. Either the ITER or FIRE experiment would reveal the behavior of burning plasmas, generate large amounts of fusion power, and be a huge step in establishing the potential of fusion energy to contribute to the world's energy security.

  2. Regulatory cross-cutting topics for fuel cycle facilities.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research & Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas: Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities) Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed: Integrated Security,more » Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)« less

  3. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    NASA Ares I-X Launch Director Ed Mango monitors the launch countdown from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the planned launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  4. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X Launch Director Ed Mango, 3rd from left, along with other mission managers watches the launch of the Ares I-X rocket from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  5. NASA to launch second business communications satellite

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The two stage Delta 3910 launch vehicle was chosen to place the second small business satellite (SBS-B) into a transfer orbit with an apogee of 36,619 kilometers and a perigee of 167 km, at an inclination of 27.7 degrees to Earth's equator. The firing and separation sequence and the inertial guidance system are described as well as the payload assist module. Facilities and services for tracking and control by NASA, COMSAT, Intelsat, and SBS are outlined and prelaunch operations are summarized.

  6. Release of the Biological Control Agent Puccinia jaceae var. solstitialis for Management of Yellow Starthistle at Fort Hunter Liggett, CA

    DTIC Science & Technology

    2010-07-01

    used to manipulate the environment by burning, grazing, or revegetation efforts. Five insect species and a fungus have been officially released as...satisfied, the fungus would probably do extremely well and stress the plant early in the growing season. Used in conjunction with seed- feeding insects , it...241 km) south of San Francisco. The fort is primarily used as a training facility, where activities such as field maneuvers and live fire

  7. Methods for nuclear air-cleaning-system accident-consequence assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrae, R.W.; Bolstad, J.W.; Gregory, W.S.

    1982-01-01

    This paper describes a multilaboratory research program that is directed toward addressing many questions that analysts face when performing air cleaning accident consequence assessments. The program involves developing analytical tools and supportive experimental data that will be useful in making more realistic assessments of accident source terms within and up to the atmospheric boundaries of nuclear fuel cycle facilities. The types of accidents considered in this study includes fires, explosions, spills, tornadoes, criticalities, and equipment failures. The main focus of the program is developing an accident analysis handbook (AAH). We will describe the contents of the AAH, which include descriptionsmore » of selected nuclear fuel cycle facilities, process unit operations, source-term development, and accident consequence analyses. Three computer codes designed to predict gas and material propagation through facility air cleaning systems are described. These computer codes address accidents involving fires (FIRAC), explosions (EXPAC), and tornadoes (TORAC). The handbook relies on many illustrative examples to show the analyst how to approach accident consequence assessments. We will use the FIRAC code and a hypothetical fire scenario to illustrate the accident analysis capability.« less

  8. Tested by Fire - How two recent Wildfires affected Accelerator Operations at LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spickermann, Thomas

    2012-08-01

    In a little more than a decade two large wild fires threatened Los Alamos and impacted accelerator operations at LANL. In 2000 the Cerro Grande Fire destroyed hundreds of homes, as well as structures and equipment at the DARHT facility. The DARHT accelerators were safe in a fire-proof building. In 2011 the Las Conchas Fire burned about 630 square kilometers (250 square miles) and came dangerously close to Los Alamos/LANL. LANSCE accelerator operations Lessons Learned during Las Conchas fire: (1) Develop a plan to efficiently shut down the accelerator on short notice; (2) Establish clear lines of communication in emergencymore » situations; and (3) Plan recovery and keep squirrels out.« less

  9. Modeling and Analysis of Realistic Fire Scenarios in Spacecraft

    NASA Technical Reports Server (NTRS)

    Brooker, J. E.; Dietrich, D. L.; Gokoglu, S. A.; Urban, D. L.; Ruff, G. A.

    2015-01-01

    An accidental fire inside a spacecraft is an unlikely, but very real emergency situation that can easily have dire consequences. While much has been learned over the past 25+ years of dedicated research on flame behavior in microgravity, a quantitative understanding of the initiation, spread, detection and extinguishment of a realistic fire aboard a spacecraft is lacking. Virtually all combustion experiments in microgravity have been small-scale, by necessity (hardware limitations in ground-based facilities and safety concerns in space-based facilities). Large-scale, realistic fire experiments are unlikely for the foreseeable future (unlike in terrestrial situations). Therefore, NASA will have to rely on scale modeling, extrapolation of small-scale experiments and detailed numerical modeling to provide the data necessary for vehicle and safety system design. This paper presents the results of parallel efforts to better model the initiation, spread, detection and extinguishment of fires aboard spacecraft. The first is a detailed numerical model using the freely available Fire Dynamics Simulator (FDS). FDS is a CFD code that numerically solves a large eddy simulation form of the Navier-Stokes equations. FDS provides a detailed treatment of the smoke and energy transport from a fire. The simulations provide a wealth of information, but are computationally intensive and not suitable for parametric studies where the detailed treatment of the mass and energy transport are unnecessary. The second path extends a model previously documented at ICES meetings that attempted to predict maximum survivable fires aboard space-craft. This one-dimensional model implies the heat and mass transfer as well as toxic species production from a fire. These simplifications result in a code that is faster and more suitable for parametric studies (having already been used to help in the hatch design of the Multi-Purpose Crew Vehicle, MPCV).

  10. Contamination Impact of Station Brush Fire on Cleanroom Facilities

    NASA Technical Reports Server (NTRS)

    Carey, Phil; Blakkolb, Brian

    2010-01-01

    Brush and forest fires, both naturally occurring and anthropogenic in origin, in proximity to space flight hardware processing facilities raise concerns about the threat of contamination resulting from airborne particulate and molecular components of smoke. Perceptions of the severity of the threat are possibly heightened by the high sensitivity of the human sense of smell to some components present in the smoke of burning vegetation.On August 26th, 2009, a brushfire broke out north of Pasadena, California, two miles from the Jet Propulsion Laboratory. The Station Fire destroyed over 160,000 acres, coming within a few hundred yards of JPL. Smoke concentrations on Lab were very heavy over several days. All Lab operations were halted, and measures were taken to protect personnel, critical hardware, and facilities. Evaluation of real-time cleanroom monitoring data, visualinspection of facilities, filter systems, and analysis of surface cleanliness samples revealed facility environments andhardware were minimally effected.Outside air quality easily exceeded Class Ten Million. Prefilters captured most large ash and soot; multi-stage filtration greatly minimized the impact on the HEPA/ULPA filters. Air quality in HEPA filtered spacecraft assembly cleanrooms remained within Class 10,000 specification throughout. Surface cleanliness was inimally affected, as large particles were effectively removed from the airstream, and sub-micron particles have extremely long settling rates. Approximate particulate fallout within facilities was 0.00011% area coverage/day compared to 0.00038% area coverage/day during normal operations. Deposition of condensable airborne components, as measured in real time, peaked at approximately1.0 ng/cm2/day compared to 0.05 ng/cm2/day nominal.

  11. Contamination impact of station brush fire on cleanroom facilities

    NASA Astrophysics Data System (ADS)

    Carey, Philip A.; Blakkolb, Brian K.

    2010-08-01

    Brush and forest fires, both naturally occurring and anthropogenic in origin, in proximity to space flight hardware processing facilities raise concerns about the threat of contamination resulting from airborne particulate and molecular components of smoke. Perceptions of the severity of the threat are possibly heightened by the high sensitivity of the human sense of smell to some components present in the smoke of burning vegetation. On August 26th, 2009, a brushfire broke out north of Pasadena, California, two miles from the Jet Propulsion Laboratory. The Station Fire destroyed over 160,000 acres, coming within a few hundred yards of JPL. Smoke concentrations on Lab were very heavy over several days. All Lab operations were halted, and measures were taken to protect personnel, critical hardware, and facilities. Evaluation of real-time cleanroom monitoring data, visual inspection of facilities, filter systems, and analysis of surface cleanliness samples revealed facility environments and hardware were minimally effected. Outside air quality easily exceeded Class Ten Million. Prefilters captured most large ash and soot; multi-stage filtration greatly minimized the impact on the HEPA/ULPA filters. Air quality in HEPA filtered spacecraft assembly cleanrooms remained within Class 10,000 specification throughout. Surface cleanliness was minimally affected, as large particles were effectively removed from the airstream, and sub-micron particles have extremely long settling rates. Approximate particulate fallout within facilities was 0.00011% area coverage/day compared to 0.00038% area coverage/day during normal operations. Deposition of condensable airborne components, as measured in real time, peaked at approximately 1.0 ng/cm2/day compared to 0.05 ng/cm2/day nominal.

  12. Temporal Geophysical Investigations of the FT-2-Plume at the Wurtsmith Air Force Base, Oscoda, Michigan

    EPA Science Inventory

    The decommissioned Wurtsmith Air Force Base former Fire Training Cell (FT-02) facility has been the focus of several geophysical investigations. After several decades of fire training exercises, significant amounts of hydrocarbons and some solvents seeped into the subsurface cont...

  13. TEMPORAL GEOPHYSICAL INVESTIGATIONS OF THE FT-2-PLUME AT THE WURTSMITH AIR FORCE BASE, OSCODA, MICHIGAN

    EPA Science Inventory

    The decommissioned Wurtsmith Air Force Base former Fire Training Cell (FT-02) facility has been the focus of several geophysical investigations. After several decades of fire training exercises, significant amounts of hydrocarbons and some solvents seeped into the Subsurface cont...

  14. Occupancy Fire Record. Libraries.

    ERIC Educational Resources Information Center

    National Fire Protection Association, Boston, MA.

    Considerations essential to adequate protection for library facilities have been assembled in the form of recommendations and related to specific examples. Five steps are given which outline the procedures to follow in order to achieve fire safety. With regard to planning, six considerations are dealt with in detail--(1) the saving of lives, (2)…

  15. Coal-Fired Boilers at Navy Bases, Navy Energy Guidance Study, Phase II and III.

    DTIC Science & Technology

    1979-05-01

    several sizes were performed. Central plants containing four equal-sized boilers and central flue gas desulfurization facilities were shown to be less...Conceptual design and parametric cost studies of steam and power generation systems using coal-fired stoker boilers and stack gas scrubbers in

  16. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  17. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  18. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  19. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  20. 24 CFR 232.510 - Commitment and commitment fee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Fees and Charges § 232.510 Commitment and commitment fee. (a) Issuance of... setting forth the terms and conditions upon which the fire safety loan will be insured. (b) Type of...

  1. Production and efficiency of large wildland fire suppression effort: A stochastic frontier analysis.

    PubMed

    Katuwal, Hari; Calkin, David E; Hand, Michael S

    2016-01-15

    This study examines the production and efficiency of wildland fire suppression effort. We estimate the effectiveness of suppression resource inputs to produce controlled fire lines that contain large wildland fires using stochastic frontier analysis. Determinants of inefficiency are identified and the effects of these determinants on the daily production of controlled fire line are examined. Results indicate that the use of bulldozers and fire engines increase the production of controlled fire line, while firefighter crews do not tend to contribute to controlled fire line production. Production of controlled fire line is more efficient if it occurs along natural or built breaks, such as rivers and roads, and within areas previously burned by wildfires. However, results also indicate that productivity and efficiency of the controlled fire line are sensitive to weather, landscape and fire characteristics. Copyright © 2015 Elsevier Ltd. All rights reserved.

  2. Is your electric process heater safe?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tiras, C.S.

    2000-04-01

    Over the past 35 years, electric process heaters (EPHs) have been used to heat flowing fluids in different sectors of the energy industry: oil and gas exploration and production, refineries, petrochemical plants, pipeline compression facilities and power-generation plants. EPHs offer several advantages over fired heaters and shell-and-tube exchangers, which have been around for many years, including: smaller size, lighter weight, cleaner operation, lower capital costs, lower maintenance costs, no emissions or leakage, better control and improved safety. However, while many industrial standards have addressed safety concerns of fired heaters and shell-and-tube exchangers (API, TEMA, NFPA, OSHA and NEC), no standardsmore » address EPHs. The paper presents a list of questions that plant operators need to ask about the safety of their electric process heaters. The answers are also given.« less

  3. Developing a byproduct materials information system for the Kentucky Transportation Cabinet.

    DOT National Transportation Integrated Search

    2007-09-01

    Kentucky has numerous coal-fired, electric generating facilities and, as a result, there are abundant byproduct materials being produced from these facilities that have environmental, engineering, and economic potential as materials for use in common...

  4. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  5. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  6. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  7. Spacecraft Fire Safety Research at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Meyer, Marit

    2016-01-01

    Appropriate design of fire detection systems requires knowledge of both the expected fire signature and the background aerosol levels. Terrestrial fire detection systems have been developed based on extensive study of terrestrial fires. Unfortunately there is no corresponding data set for spacecraft fires and consequently the fire detectors in current spacecraft were developed based upon terrestrial designs. In low gravity, buoyant flow is negligible which causes particles to concentrate at the smoke source, increasing their residence time, and increasing the transport time to smoke detectors. Microgravity fires have significantly different structure than those in 1-g which can change the formation history of the smoke particles. Finally the materials used in spacecraft are different from typical terrestrial environments where smoke properties have been evaluated. It is critically important to detect a fire in its early phase before a flame is established, given the fixed volume of air on any spacecraft. Consequently, the primary target for spacecraft fire detection is pyrolysis products rather than soot. Experimental investigations have been performed at three different NASA facilities which characterize smoke aerosols from overheating common spacecraft materials. The earliest effort consists of aerosol measurements in low gravity, called the Smoke Aerosol Measurement Experiment (SAME), and subsequent ground-based testing of SAME smoke in 55-gallon drums with an aerosol reference instrument. Another set of experiments were performed at NASAs Johnson Space Center White Sands Test Facility (WSTF), with additional fuels and an alternate smoke production method. Measurements of these smoke products include mass and number concentration, and a thermal precipitator was designed for this investigation to capture particles for microscopic analysis. The final experiments presented are from NASAs Gases and Aerosols from Smoldering Polymers (GASP) Laboratory, with selected results focusing on realistic fuel preparations and heating profiles with regards to early detection of smoke. SAFFIRE is the upcoming large-scale fire experiment which will be executed in a Cygnus vehicle after it undocks from the ISS.

  8. What can be done to reduce false alarms?

    PubMed

    Baillie, Jonathan

    2013-05-01

    Although (the Department for Communities and Local Government's 'Fire statistics' reveal) the number of such incidents has fallen every year since 2006/07, UK fire and rescue services still attended over 312,400 'false fire alarms,' i.e. instances where, on arriving at a site, they found no fire, in 2011/12. Such incidents have been a significant concern for healthcare facilities teams, and for the fire and rescue services serving them, for many years, and, although the past decade has seen determined efforts to substantially reduce the number bearing fruit, many believe far too many still occur. HEJ editor, Jonathan Baillie, reports on a recent London roundtable discussion staged by two leading fire detection and alarm equipment specialists, Apollo Fire Detectors, and Static Systems Group, with IHEEM, which brought together experts to discuss what more can be done to minimise false fire alarms.

  9. Historical and future emission of hazardous air pollutants (HAPs) from gas-fired combustion in Beijing, China.

    PubMed

    Xue, Yifeng; Nie, Lei; Zhou, Zhen; Tian, Hezhong; Yan, Jing; Wu, Xiaoqing; Cheng, Linglong

    2017-07-01

    The consumption of natural gas in Beijing has increased in the past decade due to energy structure adjustments and air pollution abatement. In this study, an integrated emission inventory of hazardous air pollutants (HAPs) emitted from gas-fired combustion in Beijing was developed for the period from 2000 to 2014 using a technology-based approach. Future emission trends were projected through 2030 based on current energy-related and emission control policies. We found that emissions of primary HAPs exhibited an increasing trend with the rapid increase in natural gas consumption. Our estimates indicated that the total emissions of NO X , particulate matter (PM) 10 , PM 2.5 , CO, VOCs, SO 2 , black carbon, Pb, Cd, Hg, As, Cr, Cu, Ni, Zn, polychlorinated dibenzo-p-dioxins and dibenzofurans, and benzo[a]pyrene from gas-fired combustion in Beijing were approximately 22,422 t, 1042 t, 781 t, 19,097 t, 653 t, 82 t, 19 t, 0.6 kg, 0.1 kg, 43 kg, 52 kg, 0.3 kg, 0.03 kg, 4.3 kg, 0.6 kg, 216 μg, and 242 g, respectively, in 2014. To mitigate the associated air pollution and health risks caused by gas-fired combustion, stricter emission standards must be established. Additionally, combustion optimization and flue gas purification system could be used for lowering NO X emissions from gas-fired combustion, and gas-fired facilities should be continuously monitored based on emission limits. Graphical abstract Spatial distribution and typical live photos of gas-fired boiler in Beijing.

  10. Safety engineering in handling fuels and lubricants in civil aviation

    NASA Astrophysics Data System (ADS)

    Protoereiskii, Aleksandr Stepanovich

    The book is concerned with methods of improving working conditions, work hygiene, safety engineering, and fire and explosion prevention during the storage and handling of petroleum products at fuel and lubricant storage facilities. The discussion covers methods of protection against static and atmospheric discharges, lightning protection, safety engineering in fuel and lubricant laboratories, and methods of fire prevention and fire extinction. Attention is also given to methods for administering first aid in case of accidents and poisoning.

  11. A common sense approach to sprinklers.

    PubMed

    Passingham, Andy

    2010-03-01

    As debate continues over the importance of incorporating automatic sprinkler systems into healthcare facilities, Andy Passingham, associate director at Arup Fire, considers how Arup, the multi-disciplinary engineers for two high profile new Welsh hospitals under construction in Ebbw Vale and Caerphilly, addressed fire safety on both projects. He highlights how the installation of sprinklers should not only improve fire safety, but has also contributed to a number of wider design elements which should enhance the patient, staff, and visitor experience.

  12. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters use a fire truck to put out a fire burning close to a mock-up of a small plane and a truck. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  13. Further studies of fuels from alternate sources - fire extinguishment experiments with JP-5 jet turbine fuel derived from shale. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hazlett, R.N.; Affens, W.A.; McLaren, G.W.

    1978-05-01

    Fire extinguishment experiments with JP-5 jet fuels derived from shale crude oil and also from petroleum (for comparison) were conducted at NRL's Chesapeake Bay facility. The experiments were conducted in a 40-foot diameter circular pool using Aqueous Film Forming Foam (AFFF) as the fire extinguishing agent. The results with both types of fuel were similar, and it was concluded that the techniques and agents for AFFF application, which have been developed for petroleum fuel fires, can also be used for shale derived jet fuel.

  14. 40 CFR 60.42c - Standard for sulfur dioxide (SO2).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....2 lb/MMBtu) heat input. If coal is combusted with other fuels, the affected facility shall neither... excess of 520 ng/J (1.2 lb/MMBtu) heat input. If coal is fired with coal refuse, the affected facility.../MMBtu) heat input. If coal is combusted with other fuels, the affected facility is subject to the 50...

  15. 42 CFR 124.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...

  16. Nursing home resident smoking policies.

    PubMed

    Stefanacci, Richard G; Lester, Paula E; Kohen, Izchak

    2008-01-01

    To identify nursing home standards related to resident smoking through a nation wide survey of directors of nursing. A national survey was distributed online and was completed by 248 directors of nursing. The directors of nurses answered questions concerning resident smoking including the criteria utilized to determine an unsafe resident smoker. For those residents identified as unsafe, the questions asked were specifically related to monitoring, staff involvement, safety precautions and policy. The results of the survey demonstrated a consistent policy practiced among facilities across the United States. The monitoring of nursing home residents is based on a resident's mental acuity, physical restrictions and equipment requirements. Once a resident was identified as a smoker at risk of harm to self or others, staff involvement ranged from distributing cigarettes to direct supervision. In addition, the majority of facilities required residents to wear fire resistant aprons and provided a fire extinguisher in smoking areas. Monitoring policies of nursing home residents who smoke starts with identifying those residents at risk based on an assessment of mental acuity, physical restrictions and equipment requirements. Those that are identified as being at risk smokers have their cigarettes controlled and distributed by nursing staff and are supervised by facility staff when smoking. This policy is implemented through written policy as well as staff education. Despite some discrepancies in the actual implementation of policies to supervise residents who smoke, the policies for assessment for at-risk smokers requiring monitoring is consistent on a national basis.

  17. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Fossil-Fuel-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60... provisions of this subpart apply are: (1) Each fossil-fuel-fired steam generating unit of more than 73 megawatts (MW) heat input rate (250 million British thermal units per hour (MMBtu/hr)). (2) Each fossil-fuel...

  18. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Fossil-Fuel-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60... provisions of this subpart apply are: (1) Each fossil-fuel-fired steam generating unit of more than 73 megawatts (MW) heat input rate (250 million British thermal units per hour (MMBtu/hr)). (2) Each fossil-fuel...

  19. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing... (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing... storage; and (4) Maintained to prevent the accumulation of water. (c) Welding or cutting other than that...

  20. 36 CFR 1234.34 - When may NARA conduct an inspection of a records storage facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....) Required. Entrances/Exits: X-ray & magnetometer at public entrances Recommended. Require x-ray screening of... design requirements, (e.g. fire detection, fire suppression systems, etc.) Entrances/Exits X-Ray and... would focus on tenant agencies, public interface, and feasibility. Required for Level V. Require X-Ray...

  1. 36 CFR 1234.34 - When may NARA conduct an inspection of a records storage facility?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....) Required. Entrances/Exits: X-ray & magnetometer at public entrances Recommended. Require x-ray screening of... design requirements, (e.g. fire detection, fire suppression systems, etc.) Entrances/Exits X-Ray and... would focus on tenant agencies, public interface, and feasibility. Required for Level V. Require X-Ray...

  2. Oxygen Assessments Ensure Safer Medical Devices

    NASA Technical Reports Server (NTRS)

    2013-01-01

    A team at White Sands Test Facility developed a test method to evaluate fire hazards in oxygen-enriched environments. Wendell Hull and Associates, located in Las Cruces, New Mexico, entered a Space Act Agreement with NASA and now provides services including fire and explosion investigations, oxygen testing and training, and accident reconstruction and forensic engineering.

  3. 76 FR 19768 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Beryllium Rocket Motor... . Title: NESHAP for Beryllium Rocket Motor Fuel Firing (Renewal). ICR Numbers: EPA ICR Number 1125.06, OMB...: Owners or operators of beryllium rocket motor fuel firing facilities. Estimated Number of Respondents: 1...

  4. 20 CFR 654.417 - Fire, safety, and first aid.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Fire, safety, and first aid. 654.417 Section..., safety, and first aid. (a) All buildings in which people sleep or eat shall be constructed and maintained...-type water extinguisher. (g) First aid facilities shall be provided and readily accessible for use at...

  5. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  6. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  7. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  8. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  9. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  10. They've Seen Fire and They've Seen Rain.

    ERIC Educational Resources Information Center

    Chandler, Kurt

    1998-01-01

    Recounts what school district facilities managers learned from the flood and fire disaster in Grand Forks, North Dakota. Examines the clean-up effort, such as locating sufficient architectural and construction crews to meet repair demands, and unforeseen problems, such as toxic biological growth. Also describes the damage and repair expenses. (RJM)

  11. Forest insurance number.

    Treesearch

    Thornton T. Munger; H.B. Shepard

    1934-01-01

    This inquiry, originally conceived as an effort to determine definitely whether the existing lack of adequate and practical forest fire insurance facilities is in truth unavoidable and, if possible, to suggest means whereby the condition might be remedied, finds no apparent reason why successful forest fire insurance should not be possible as far as the loss situation...

  12. KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  13. 46 CFR 78.47-17 - Fire extinguishing system controls.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Fire extinguishing system controls. 78.47-17 Section 78... Markings for Fire and Emergency Equipment, Etc. § 78.47-17 Fire extinguishing system controls. (a) The control cabinets or spaces containing valves or manifolds for the various fire extinguishing systems shall...

  14. 46 CFR 78.47-17 - Fire extinguishing system controls.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Fire extinguishing system controls. 78.47-17 Section 78... Markings for Fire and Emergency Equipment, Etc. § 78.47-17 Fire extinguishing system controls. (a) The control cabinets or spaces containing valves or manifolds for the various fire extinguishing systems shall...

  15. Summary Report of Mission Acceleration Measurements for STS-73, Launched October 20, 1995

    NASA Technical Reports Server (NTRS)

    Rogers, Melissa J. B.; DeLombard, Richard

    1996-01-01

    The microgravity environment of the Space Shuttle Columbia was measured during the STS-73 mission using accelerometers from five different instruments: the Orbital Acceleration Research Experiment, the Space Acceleration Measurement System, the Three-dimensional Microgravity Accelerometer, the Microgravity Measuring Device, and Suppression of Transient Accelerations by Levitation Evaluation System. The Microgravity Analysis Workstation quasi-steady environment calculation and comparison of this calculation with Orbital Acceleration Research Experiment data was used to assess how appropriate a planned attitude was expected to be for one Crystal Growth Facility experiment sample. The microgravity environment related to several different Orbiter, crew, and experiment operations is presented and interpreted in this report. Data are examined to show the effects of vernier reaction control system jet firings for Orbiter attitude control. This is compared to examples of data when no thrusters were firing, when the primary reaction control system jets were used for attitude control, and when single vernier jets were fired for test purposes. In general, vernier jets, when used for attitude control, cause accelerations in the 3 x 10(exp -4) g to 7 x 10(exp -4) g range. Primary jets used in this manner cause accelerations in the 0.01 to 0.025 g range. Other significant disturbance sources characterized are water dump operations, with Y(sub b) axis acceleration deviations of about 1 x 10(exp -6) g; payload bay door opening motion, with Y(sub o) and Z(sub o) axis accelerations of frequency 0.4 Hz; and probable Glovebox fan operations with notable frequency components at 20, 38, 43, 48, and 53 Hz. The STS-73 microgravity environment is comparable to the environments measured on earlier microgravity science missions.

  16. Saturn Apollo Program

    NASA Image and Video Library

    1967-08-01

    This photograph is a view of the Saturn V S-IC-5 (first) flight stage static test firing at the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. Begirning operations in 1966, the MTF has two test stands, a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 407-foot-high test stand for the static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988.

  17. Hot-Fire Testing of 5N and 22N HPGP Thrusters

    NASA Technical Reports Server (NTRS)

    Burnside, Christopher G.; Pedersen, Kevin W.; Pierce, Charles W.

    2015-01-01

    This hot-fire test continues NASA investigation of green propellant technologies for future missions. To show the potential for green propellants to replace some hydrazine systems in future spacecraft, NASA Marshall Space Flight Center (MSFC) is continuing to embark on hot-fire test campaigns with various green propellant blends.NASA completed hot-fire testing of 5N and 22N HPGP thrusters at the Marshall Space Flight Center’s Component Development Area altitude test stand in April 2015. Both thrusters are ground test articles and not flight ready units, but are representative of potential flight hardware with a known path towards flight application. The purpose of the 5N testing was to perform facility check-outs and generate a small set of data for comparison to ECAPS and Orbital ATK data sets. The 5N thruster performed as expected with thrust and propellant flow-rate data generated that are similar to previous testing at Orbital ATK. Immediately following the 5N testing, and using the same facility, the 22N testing was conducted on the same test stand with the purpose of demonstrating the 22N performance. The results of 22N testing indicate it performed as expected.The results of the hot-fire testing are presented in this paper and presentation.

  18. Facility Activation and Characterization for IPD Workhorse Preburner and Oxidizer Turbopump Hot-Fire Testing at NASA Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Sass, J. P.; Raines, N. G.; Ryan, H. M.

    2004-01-01

    The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.

  19. A3 Subscale Rocket Hot Fire Testing

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Yen, J.

    2009-01-01

    This paper gives a description of the methodology and results of J2-X Subscale Simulator (JSS) hot fire testing supporting the A3 Subscale Diffuser Test (SDT) project at the E3 test facility at Stennis Space Center, MS (SSC). The A3 subscale diffuser is a geometrically accurate scale model of the A3 altitude simulating rocket test facility. This paper focuses on the methods used to operate the facility and obtain the data to support the aerodynamic verification of the A3 rocket diffuser design and experimental data quantifying the heat flux throughout the facility. The JSS was operated at both 80% and 100% power levels and at gimbal angle from 0 to 7 degrees to verify the simulated altitude produced by the rocket-rocket diffuser combination. This was done with various secondary GN purge loads to quantify the pumping performance of the rocket diffuser. Also, special tests were conducted to obtain detailed heat flux measurements in the rocket diffuser at various gimbal angles and in the facility elbow where the flow turns from vertical to horizontal upstream of the 2nd stage steam ejector.

  20. NoFoam Unit Installation, Evaluation and Operations Manual

    DTIC Science & Technology

    2003-03-10

    Aqueous Film Forming Foam ( AFFF ) liquid concentrate in their fleet do not have the facilities...NoFoam Unit using AFRL vehicles and facilities. Currently, the majority of Fire Departments that use 3% Aqueous Film Forming Foam ( AFFF ) liquid...Departments that have ARFF vehicles that use 3% Aqueous Film Forming Foam ( AFFF ) liquid concentrate in their fleet do not have the facilities

  1. A Summary of NASA and USAF Hypergolic Propellant Related Spills and Fires

    NASA Technical Reports Server (NTRS)

    Nufer, Brian M.

    2009-01-01

    Several unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, the Titan Program, and a few others have occurred over the past several decades. Spill sites include the following government facilities: Kennedy Space Center (KSC), Johnson Space Center (JSC), White Sands Test Facility (WSTF), Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS), Edwards Air Force Base (EAFB), Little Rock AFB, and McConnell AFB. Until now, the only method of capturing the lessons learned from these incidents has been "word of mouth" or by studying each individual incident report. The root causes and consequences of the incidents vary drastically; however, certain "themes" can be deduced and utilized for future hypergolic propellant handling. Some of those common "themes" are summarized below: (1) Improper configuration control and internal or external human performance shaping factors can lead to being falsely comfortable with a system (2) Communication breakdown can escalate an incident to a level where injuries occur and/or hardware is damaged (3) Improper propulsion system and ground support system designs can destine a system for failure (4) Improper training of technicians, engineers, and safety personnel can put lives in danger (5) Improper PPE, spill protection, and staging of fire extinguishing equipment can result in unnecessary injuries or hardware damage if an incident occurs (6) Improper procedural oversight, development, and adherence to the procedure can be detrimental and quickly lead to an undesirable incident (7) Improper materials cleanliness or compatibility and chemical reactivity can result in fires or explosions (8) Improper established "back-out" and/or emergency safing procedures can escalate an event The items listed above are only a short list of the issues that should be recognized prior to handling hypergolic fluids or processing vehicles containing hypergolic propellants. The summary of incidents in this report is intended to cover many more issues than those listed above.

  2. Conversion of an 800 MW oil fired generating unit to burn Orimulsion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blum, J.; Halpin, M.; Morgan, D.

    1998-07-01

    Florida Power and Light Company (FPL) is proposing to convert the two existing 800 megawatt (MW) residual oil fired generating units at its Manatee Plant located in Parrish, Florida, to burn Ormulsion. Ormulsion is the registered trademark name for a mixture of water and a naturally occurring heavy hydrocarbon known as bitumen. Orimulsion, which originates in Venezuela, will be shipped to Port Manatee in double-hulled vessels, stored at FPL's existing Port Manatee Terminal, and transported via FPL's existing fuel pipeline to the Manatee Plant. The proposed conversion involves modifications of the existing fuel handling facilities, enhancements of the boiler heatmore » transfer surfaces and soot blowing system, and addition of new pollution control equipment. The Manatee Orimulsion conversion will result in overall environmental benefits and significant savings to FPL's customers. This paper summarizes the overall objectives of the project and briefly describes these modifications.« less

  3. Conversion of an 800 MW oil fired generating unit to burn Orimulsion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blum, J.; Halpin, M.; Morgan, D.

    1998-04-01

    Florida Power & Light Company (FPL) is proposing to convert the two existing 800 megawatt (MW) residual oil fired generating units at its Manatee Plant located in Parrish, Florida, to burn Orimulsion. Orimulsion is the registered trademark name for a mixture of water and a naturally occurring heavy hydrocarbon known as bitumen. Orimulsion, which originates in Venezuela, will be shipped to Port Manatee in double-hulled vessels, stored at FPL`s existing Port Manatee Terminal, and transported via FPL`s existing fuel pipeline to the Manatee Plant. The proposed conversion involves modifications of the existing fuel handling facilities, enhancements of the boiler heatmore » transfer surfaces and soot blowing system, and addition of new pollution control equipment. The Manatee Orimulsion conversion will result in overall environmental benefits and significant savings to FPL`s customers. This paper summarizes the overall objectives of the project and briefly describes these modifications.« less

  4. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Final rule.

    PubMed

    2006-09-22

    This final rule adopts the substance of the April 15, 2004 tentative interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment allows certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This final rule also requires that nursing facilities at least install battery-operated single station smoke alarms in resident rooms and common areas if they are not fully sprinklered or they do not have system-based smoke detectors in those areas. Finally, this final rule confirms as final the provisions of the March 25, 2005 interim final rule with changes and responds to public comments on that rule.

  5. National Ignition Facility under fire over ignition failure

    NASA Astrophysics Data System (ADS)

    Allen, Michael

    2016-08-01

    The 3.5bn National Ignition Facility (NIF) at the Lawrence Livermore National Laboratory in California is no nearer to igniting a sustainable nuclear fusion burn - four years after its initial target date - according to a report by the US National Nuclear Security Administration (NNSA).

  6. 24 CFR 232.540 - Method of loan payment and amortization period.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety Equipment Eligible Security Instruments § 232.540 Method of loan...

  7. KSC-98pc767

    NASA Image and Video Library

    1998-06-22

    KENNEDY SPACE CENTER, FLA. -- A fire burns in the background as members of the U.S Fish and Wildlife Service operate firefighting equipment soaking the grass and underbrush in an attempt to keep the fire away from Kennedy Parkway and the wooded area on the other side of the road. Lightning touched off three different fires Sunday evening in and around Kennedy Space Center at Tel IV, Ransom Road and Pine Island Road. This area is part of the Merritt Island National Wildlife Refuge operated by the service. The fires were a short distance from operational facilities at the space center and forced the closing of Florida State Route 3. The fires are being contained by firefighters from Kennedy Space Center and the U.S. Fish and Wildlife Service

  8. Preliminary Guidelines For Using Suppression Fires to Control Wildfires in the Southeast

    Treesearch

    Robert W. Cooper

    1969-01-01

    Suppression firing is defied as the application of fire to speed or strengthen control action on free-burning wildfires. The key to successful suppression firing is availability of personnel knowledgeable in specific application plus an adequate supply of manpower and equipment to contain the set fire. Preliminary guidelines for the use of this fire-control tool are...

  9. Fuelling the palaeoatmospheric oxygen debate: how much atmospheric oxygen is required for ignition and propagation of smouldering fires?

    NASA Astrophysics Data System (ADS)

    Belcher, Claire M.; Hadden, Rory; McElwain, Jennifer C.; Rein, Guillermo

    2010-05-01

    Fire is a natural process integral to ecosystems at a wide range of temporal and spatial scales and is a key driver of change in the Earth system. Fire has been a major influence on Earth's systems since the Carboniferous. Whilst, climate is considered the ultimate control on global vegetation, fire is now known to play a key role in determining vegetation structure and composition, such that many of the world's ecosystems can be considered fire-dependant. Products of fire include chars, soots and aromatic hydrocarbon species all of which can be traced in ancient through to modern sediments. Atmospheric oxygen has played a key role in the development of life on Earth, with the rise of oxygen in the Precambrian being closely linked to biological evolution. Variations in the concentration of atmospheric oxygen throughout the Phanerozoic are predicted from models based on geochemical cycling of carbon and sulphur. Such models predict that low atmospheric oxygen concentrations prevailed in the Mesozoic (251-65ma) and have been hypothesised to be the primary driver of at least two of the ‘big five' mass extinction events in the Phanerozoic. Here we assess the levels of atmospheric oxygen required to ignite a fire and infer the likely levels of atmospheric oxygen to support smouldering combustion. Smouldering fire dynamics and its effects on ecosystems are very different from flaming fires. Smouldering fires propagate slowly, are usually low in temperature and represent a flameless form of combustion. These fires creep through organic layers of forest ground and peat lands and are responsible for a large fraction of the total biomass consumed in wildfires globally and are also a major contributor of carbon dioxide to the atmosphere. Once ignited, they can persist for long periods of time (months, years) spreading over very extensive areas of forest and deep into soil. Smouldering fires are therefore, the oldest continuously burning fires on Earth. We have combined expertise from both the Earth science and fire engineering disciplines to develop realistic ignition mechanisms and measurements of fire propagation within different levels of atmospheric oxygen. We present data from experimental burns run in the fully controlled and realistic atmospheric environment of the UCD PÉAC facility. The burns are designed to develop our understanding of ignition of fires in the natural world. We have studied ignition and propagation of fire in peat, a natural and highly flammable substance. Peat samples of approximately 100mm by 100mm in cross section and 50mm in depth were exposed to an ignition source (~100W of electric power) for 30 minutes. Thermocouples were placed throughout the sample to measure temperature changes during the initial 30 minute ignition phase and in order to observe ignition of the peat, intensity of combustion and spread of the smouldering front within the different atmospheric oxygen settings. We show that ignition and propagation of smouldering in peat does not occur below 16% atmospheric oxygen and that smouldering combustion continues for long periods (~4 hours in the size sample used) at 18% atmospheric oxygen and above. This suggests that atmospheric levels above 16% atmospheric are required to allow ignition and propagation of smouldering fires and that frequent occurrences of wildfires might only be expected in the geological past when atmospheric levels were above 18% oxygen. Fires play an important role in Earth's biogeochemical cycles; this work suggests that fire feedbacks into the Earth system would likely have been suppressed during periods of low atmospheric oxygen.

  10. An Earth-Based Equivalent Low Stretch Apparatus to Assess Material Flammability for Microgravity & Extraterrestrial Fire-Safety Applications

    NASA Technical Reports Server (NTRS)

    Olson, S. L.; Beeson, H.; Haas, J.

    2001-01-01

    One of the performance goals for NASA's enterprise of Human Exploration and Development of Space (HEDS) is to develop methods, data bases, and validating tests for material flammability characterization, hazard reduction, and fire detection/suppression strategies for spacecraft and extraterrestrial habitats. This work addresses these needs by applying the fundamental knowledge gained from low stretch experiments to the development of a normal gravity low stretch material flammability test method. The concept of the apparatus being developed uses the low stretch geometry to simulate the conditions of the extraterrestrial environment through proper scaling of the sample dimensions to reduce the buoyant stretch in normal gravity. The apparatus uses controlled forced-air flow to augment the low stretch to levels which simulate Lunar or Martian gravity levels. In addition, the effect of imposed radiant heat flux on material flammability can be studied with the cone heater. After breadboard testing, the apparatus will be integrated into NASA's White Sands Test Facility's Atmosphere-Controlled Cone Calorimeter for evaluation as a new materials screening test method.

  11. Spatial-Temporal Dynamics of Urban Fire Incidents: a Case Study of Nanjing, China

    NASA Astrophysics Data System (ADS)

    Yao, J.; Zhang, X.

    2016-06-01

    Fire and rescue service is one of the fundamental public services provided by government in order to protect people, properties and environment from fires and other disasters, and thus promote a safer living environment. Well understanding spatial-temporal dynamics of fire incidents can offer insights for potential determinants of various fire events and enable better fire risk estimation, assisting future allocation of prevention resources and strategic planning of mitigation programs. Using a 12-year (2002-2013) dataset containing the urban fire events in Nanjing, China, this research explores the spatial-temporal dynamics of urban fire incidents. A range of exploratory spatial data analysis (ESDA) approaches and tools, such as spatial kernel density and co-maps, are employed to examine the spatial, temporal and spatial-temporal variations of the fire events. Particular attention has been paid to two types of fire incidents: residential properties and local facilities, due to their relatively higher occurrence frequencies. The results demonstrated that the amount of urban fire has greatly increased in the last decade and spatial-temporal distribution of fire events vary among different incident types, which implies varying impact of potential influencing factors for further investigation.

  12. 77 FR 66929 - Approval and Promulgation of Implementation Plans; State of Idaho; Regional Haze State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    .... Simplot, a phosphate fertilizer manufacturing facility which is 86 km from Craters of the Moon National... any type is primarily due to emissions of organic carbon and elemental carbon, and to a lesser extent... organic carbon emissions in 2018 from natural fires compared to 4,100 tons from anthropogenic fires. With...

  13. 75 FR 17644 - Update to NFPA 101, Life Safety Code, for State Home Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 51 RIN 2900-AN59 Update to NFPA 101, Life Safety Code... certain provisions of the 2009 edition of the National Fire Protection Association's NFPA 101, Life Safety... standards regarding life safety and fire safety. DATES: Written comments must be received by VA on or before...

  14. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... structural elements and construction assemblies must be in accordance with ASTM E 119-98 (incorporated by... necessary, they must be protected by self-closing or automatic Class A fire doors, or equivalent doors that... such areas with 4-hour rated construction assemblies. (p) Equipment rows running perpendicular to the...

  15. Identity and distribution of residues of energetic compounds at army live-fire training ranges.

    PubMed

    Jenkins, Thomas F; Hewitt, Alan D; Grant, Clarence L; Thiboutot, Sonia; Ampleman, Guy; Walsh, Marianne E; Ranney, Thomas A; Ramsey, Charles A; Palazzo, Antonio J; Pennington, Judith C

    2006-05-01

    Environmental investigations have been conducted at 23 military firing ranges in the United States and Canada. The specific training facilities most frequently evaluated were hand grenade, antitank rocket, and artillery ranges. Energetic compounds (explosives and propellants) were determined and linked to the type of munition used and the major mechanisms of deposition.

  16. Cold Regions Test of Indirect Fire Weapons Ammunition

    DTIC Science & Technology

    1983-03-08

    COLD REGIONS TEST OF INDIRECT FIRE WEAPONS AMMUNITION Paragraph 1 . SCOPE. 1 2. FACILITIES AND INSTRUMENTATION .......... 3. PREPARATION FOR TEST...A- 1 B. Data Collection Sheets ..... .............. B- 1 C. References ..... .................... ... C- 1 D. Cold-Dry...Uniform .D...... .. ... .. ... 0- 1 1 . SCOPE. The procedures outlined in this TOP are designed to determine the c-h-arac-teristics of indirect artillery

  17. 2. VIEW OF THE GLOVE BOX WHERE, ON SEPTEMBER 11, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. VIEW OF THE GLOVE BOX WHERE, ON SEPTEMBER 11, 1957, A FIRE STARTED. THE FIRE SPREAD TO THE REST OF THE BUILDING, RESULTING IN THE TRANSFER OF PLUTONIUM FOUNDRY, FABRICATION, AND ASSEMBLY OPERATIONS TO BUILDING 776/777. (9/16/57) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  18. 40 CFR Appendix Y to Part 51 - Guidelines for BART Determinations Under the Regional Haze Rule

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... establishing BART emission limitations for fossil-fuel fired power plants having a capacity in excess of 750...: (1) Fossil-fuel fired steam electric plants of more than 250 million British thermal units (BTU) per...) Sintering plants, (20) Secondary metal production facilities, (21) Chemical process plants, (22) Fossil-fuel...

  19. 40 CFR Appendix Y to Part 51 - Guidelines for BART Determinations Under the Regional Haze Rule

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... establishing BART emission limitations for fossil-fuel fired power plants having a capacity in excess of 750...: (1) Fossil-fuel fired steam electric plants of more than 250 million British thermal units (BTU) per...) Sintering plants, (20) Secondary metal production facilities, (21) Chemical process plants, (22) Fossil-fuel...

  20. 40 CFR Appendix Y to Part 51 - Guidelines for BART Determinations Under the Regional Haze Rule

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... establishing BART emission limitations for fossil-fuel fired power plants having a capacity in excess of 750...: (1) Fossil-fuel fired steam electric plants of more than 250 million British thermal units (BTU) per...) Sintering plants, (20) Secondary metal production facilities, (21) Chemical process plants, (22) Fossil-fuel...

  1. 40 CFR Appendix Y to Part 51 - Guidelines for BART Determinations Under the Regional Haze Rule

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... establishing BART emission limitations for fossil-fuel fired power plants having a capacity in excess of 750...: (1) Fossil-fuel fired steam electric plants of more than 250 million British thermal units (BTU) per...) Sintering plants, (20) Secondary metal production facilities, (21) Chemical process plants, (22) Fossil-fuel...

  2. 40 CFR Appendix Y to Part 51 - Guidelines for BART Determinations Under the Regional Haze Rule

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... establishing BART emission limitations for fossil-fuel fired power plants having a capacity in excess of 750...: (1) Fossil-fuel fired steam electric plants of more than 250 million British thermal units (BTU) per...) Sintering plants, (20) Secondary metal production facilities, (21) Chemical process plants, (22) Fossil-fuel...

  3. 78 FR 78467 - Office of Commercial Space Transportation; Notice of Intent to Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... persons regarding the FAA's intent to prepare an EIS that will evaluate the potential environmental... launches per year (12 launches per vertical launch facility), as well as up to 24 static fire engine tests or wet dress rehearsals per year (12 static fire engine tests or wet dress rehearsals per vertical...

  4. 40 CFR 267.56 - What are the required emergency procedures for the emergency coordinator?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.56 What are... designated response roles if their help is needed. (b) Whenever there is a release, fire, or explosion, the... environment that may result from the release, fire, or explosion. This assessment must consider both direct...

  5. 40 CFR 267.56 - What are the required emergency procedures for the emergency coordinator?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.56 What are... designated response roles if their help is needed. (b) Whenever there is a release, fire, or explosion, the... environment that may result from the release, fire, or explosion. This assessment must consider both direct...

  6. 40 CFR 267.56 - What are the required emergency procedures for the emergency coordinator?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Contingency Plan and Emergency Procedures § 267.56 What are... designated response roles if their help is needed. (b) Whenever there is a release, fire, or explosion, the... environment that may result from the release, fire, or explosion. This assessment must consider both direct...

  7. Fire-protection research for energy technology: Fy 80 year end report

    NASA Astrophysics Data System (ADS)

    Hasegawa, H. K.; Alvares, N. J.; Lipska, A. E.; Ford, H.; Priante, S.; Beason, D. G.

    1981-05-01

    This continuing research program was initiated in order to advance fire protection strategies for Fusion Energy Experiments (FEE). The program expanded to encompass other forms of energy research. Accomplishments for fiscal year 1980 were: finalization of the fault-free analysis of the Shiva fire management system; development of a second-generation, fire-growth analysis using an alternate model and new LLNL combustion dynamics data; improvements of techniques for chemical smoke aerosol analysis; development and test of a simple method to assess the corrosive potential of smoke aerosols; development of an initial aerosol dilution system; completion of primary small-scale tests for measurements of the dynamics of cable fires; finalization of primary survey format for non-LLNL energy technology facilities; and studies of fire dynamics and aerosol production from electrical insulation and computer tape cassettes.

  8. Incident Involving 30-Ah Li-ion Cell at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Bennett, William

    2006-01-01

    The key lesson learned from the February 17, 2006 cell explosion incident is that PC-based test-systems, even those having built-in watchdog monitors, can lose control and malfunction. In the case of lithiumion cell/battery testing, the stored energy can be released explosively causing considerable injury and damage to facilities. The investigation showed that although the Arbin system has a built-in watchdog monitor, the circumstances of the incident defeated the action of the watchdog and allowed the cycler to continue operation without control. An upgrade to the most recent version of Arbin software (version 4) was provided as a fix to the presumed control problem. This upgrade included newer EPROM s for the cycler microprocessor. Investigation revealed that similar incidents have occurred at other NASA centers with a variety of PC-based test instruments. JPL suffered an incident with Maccor testers and the GRC fuel cell group observed similar problems with LabView software. This is not exclusively an Arbin problem, but an issue with all PC-based systems. In this incident, it was fortunate that the event occurred after-hours with no-one in the room. The facility arrangement placed control consoles adjacent to the test chamber doors. Had someone been in the room during the event, they would have been exposed to hot debris and toxic combustion products. It was also fortunate that the exploded cell stayed inside the chamber after the door was forced open. If the cell had been ejected into the room it could have caused serious facility damage by impact and possibly caused a fire in the facility.

  9. LONG-TERM DEMONSTRATION OF SORBENT ENHANCEMENT ADDITIVE TECHNOLOGY FOR MERCURY CONTROL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jason D. Laumb; Dennis L. Laudal; Grant E. Dunham

    2011-05-27

    Long-term demonstration tests of advanced sorbent enhancement additive (SEA) technologies have been completed at five coal-fired power plants. The targeted removal rate was 90% from baseline conditions at all five stations. The plants included Hawthorn Unit 5, Mill Creek Unit 4, San Miguel Unit 1, Centralia Unit 2, and Hoot Lake Unit 2. The materials tested included powdered activated carbon, treated carbon, scrubber additives, and SEAs. In only one case (San Miguel) was >90% removal not attainable. The reemission of mercury from the scrubber at this facility prevented >90% capture.

  10. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for United States Air Force Plant Number 59, Johnson City, New York. Appendices

    DTIC Science & Technology

    1988-03-01

    AFP 59 SW-4 Production Field Blank Water Well Water Hart 004 Water Hart 005 f Hart 007 H.3-13 PRINCETON TESTING LABORATORYI 3v~ zANA -YS--S REDO:’- =I...observations. Enforcing the "buddy system" where appropriate. " Determining and posting locations and routes to medical facili- ties, including...poison control centers; arranging for emergency transportation to medical facilities. " Notifying local public emergency officers, i.e., police and fire

  11. Rocket nozzle thermal shock tests in an arc heater facility

    NASA Technical Reports Server (NTRS)

    Painter, James H.; Williamson, Ronald A.

    1986-01-01

    A rocket motor nozzle thermal structural test technique that utilizes arc heated nitrogen to simulate a motor burn was developed. The technique was used to test four heavily instrumented full-scale Star 48 rocket motor 2D carbon/carbon segments at conditions simulating the predicted thermal-structural environment. All four nozzles survived the tests without catastrophic or other structural failures. The test technique demonstrated promise as a low cost, controllable alternative to rocket motor firing. The technique includes the capability of rapid termination in the event of failure, allowing post-test analysis.

  12. The National Ignition Facility: alignment from construction to shot operations

    NASA Astrophysics Data System (ADS)

    Burkhart, S. C.; Bliss, E.; Di Nicola, P.; Kalantar, D.; Lowe-Webb, R.; McCarville, T.; Nelson, D.; Salmon, T.; Schindler, T.; Villanueva, J.; Wilhelmsen, K.

    2010-08-01

    The National Ignition Facility in Livermore, California, completed it's commissioning milestone on March 10, 2009 when it fired all 192 beams at a combined energy of 1.1 MJ at 351nm. Subsequently, a target shot series from August through December of 2009 culminated in scale ignition target design experiments up to 1.2 MJ in the National Ignition Campaign. Preparations are underway through the first half of of 2010 leading to DT ignition and gain experiments in the fall of 2010 into 2011. The top level requirement for beam pointing to target of 50μm rms is the culmination of 15 years of engineering design of a stable facility, commissioning of precision alignment, and precise shot operations controls. Key design documents which guided this project were published in the mid 1990's, driving systems designs. Precision Survey methods were used throughout construction, commissioning and operations for precision placement. Rigorous commissioning processes were used to ensure and validate placement and alignment throughout commissioning and in present day operations. Accurate and rapid system alignment during operations is accomplished by an impressive controls system to align and validate alignment readiness, assuring machine safety and productive experiments.

  13. Safety in the Chemical Laboratory: Fire Safety and Fire Control in the Chemistry Laboratory.

    ERIC Educational Resources Information Center

    Wilbraham, A. C.

    1979-01-01

    Discusses fire safety and fire control in the chemistry laboratory. The combustion process, extinguishing equipment, extinguisher maintenance and location, and fire safety and practices are included. (HM)

  14. A Principal's Guide to ILS Facilities Installation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.

    1992-01-01

    Outlines five facilities considerations that school principals need to address prior to the installation of an integrated learning system (ILS): (1) placement, i.e., labs or classrooms; (2) wiring; (3) environment, including furniture and noise; (4) security, including fire, theft, vandalism, and misuse; and (5) usability, including afterschool…

  15. The microgravity environment of the D1 mission

    NASA Technical Reports Server (NTRS)

    Hamacher, H.; Merbold, U.; Jilg, R.

    1990-01-01

    Some characteristic features and results of D1 microgravity measurements are discussed as performed in the Material Science Double Rack (MSDR) and the Materials Science Double Rack for Experiment Modules and Apparatus (MEDEA). Starting with a brief review of the main potential disturbances, the payload aspects of interest to the analysis and the accelerometer measuring systems are described. The microgravity data are analyzed with respect to selected mission events such as thruster firings for attitude control, operations of Spacelab experiment facilities, vestibular experiments and crew activities. The origins are divided into orbit, vehicle, and experiment induced perturbations. It has been found that the microgravity-environment is dictated mainly by payload-induced perturbations. To reduce the microgravity-level, the design of some experiment facilities has to be improved by minimizing the number of moving parts, decoupling of disturbing units from experiment facilities, by taking damping measures, etc. In addition, strongly disturbing experiments and very sensitive investigations should be performed in separate mission phases.

  16. Female Fire-Setters: Gender-Associated Psychological and Psychopathological Features.

    PubMed

    Alleyne, Emma; Gannon, Theresa A; Mozova, Katarina; Page, Thomas E; Ó Ciardha, Caoilte

    2016-01-01

    Female fire-setters are reported to commit nearly one-third of deliberately set fires, yet there are limited studies examining the characteristics that distinguish them from suitable comparison groups. The aim of this study is to compare incarcerated female fire-setters with incarcerated male fire-setters and female offender controls on psychopathological and psychological features that could be targeted via therapeutic interventions. We recruited 65 female fire-setters, 128 male fire-setters, and 63 female offenders from the prison estate. Participants completed a battery of validated tools assessing psychiatric traits and psychological characteristics (i.e., inappropriate fire interest, emotion/self-regulation, social competence, self-concept, offense-supportive attitudes, and boredom proneness) highlighted in the existing literature. Major depression and an internal locus of control distinguished female fire-setters from male fire-setters. Alcohol dependence, serious/problematic fire interest, and more effective anger regulation distinguished female fire-setters from the female offender control group. This is the first study to examine differences between female fire-setters, male fire-setters, and female control offenders on both psychopathological features and psychological traits. These findings highlight the gender-specific and offense-specific needs of female fire-setters that clinicians need to consider when implementing programs that ensure client responsivity.

  17. 76 FR 36526 - Columbia Gas Transmission, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ....47-mile of 20-inch pipeline to transport natural gas for Virginia Power Services Energy Corp., Inc...- fired electric generation facility being constructed by Virginia Electric and Power Company d/b/a... expects to complete the construction and place the electric generation facility in service during 2014...

  18. 10 CFR 503.23 - Inability to comply with applicable environmental requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... requirements. 503.23 Section 503.23 Energy DEPARTMENT OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES... operating an alternate fuel fired facility in compliance with applicable environmental requirements. (b... the proposed fuel and the alternate fuel(s) which would provide the basis for exemption. All such...

  19. Space Launch System Booster Passes Major Ground Test

    NASA Image and Video Library

    2015-03-11

    The largest, most powerful rocket booster ever built successfully fired up Wednesday for a major-milestone ground test in preparation for future missions to help propel NASA’s Space Launch System (SLS) rocket and Orion spacecraft to deep space destinations, including an asteroid and Mars. The booster fired for two minutes, the same amount of time it will fire when it lifts the SLS off the launch pad, and produced about 3.6 million pounds of thrust. The test was conducted at the Promontory, Utah test facility of commercial partner Orbital ATK.

  20. 75 FR 7517 - Notice of Intent To Prepare an Amendment to the Ring of Fire Resource Management Plan for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAKA01200.L12200000.DP0000] Notice of Intent To Prepare an Amendment to the Ring of Fire Resource Management Plan for the Campbell Tract Facility, Anchorage, AK AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY: The...

  1. 24 CFR 201.26 - Conditions for loan disbursement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... with § 201.20(c). (4) Where the proceeds are to be used for a fire safety equipment loan, the lender... jurisdiction over the fire safety requirements of health care facilities in accordance with § 201.20(c). (5) In... transaction, and if any part of the initial payment was obtained through a gift or loan, the source of the...

  2. Jointly optimizing selection of fuel treatments and siting of forest biomass-based energy production facilities for landscape-scale fire hazard reduction.

    Treesearch

    Peter J. Daugherty; Jeremy S. Fried

    2007-01-01

    Landscape-scale fuel treatments for forest fire hazard reduction potentially produce large quantities of material suitable for biomass energy production. The analytic framework FIA BioSum addresses this situation by developing detailed data on forest conditions and production under alternative fuel treatment prescriptions, and computes haul costs to alternative sites...

  3. ECKG Kladno project: First IPP in the Czech Republic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rode, J.R.; Tichy, O.J.

    1999-07-01

    The Energy Center Kladno project is the first independent power producer (IPP) project to be financed in the Czech Republic, one of Europe's most rapidly evolving markets. The total financing is $401 million and is structured in three currencies; Czech crowns, German marks, and US dollars. This paper will focus on: Enhanced technology to meet energy demands; Execution to meet the ambitious; and Overall project status. The coal and gas fired plant will produce a total of 343 MW to provide electricity and heat to the town of Kladno, west of Prague. The new plant will be located within themore » existing ECK facility and the project encompasses demolition, upgrading, and rebuilding. The base load will be from two coal-fired 135 MW circulating fluidized bed (CFB) boilers and peaking capacity from the gas-fired combustion (66 MW) turbine. The CFB's will fire a range of low sulfur brown coal supplied from the local mining company Ceskomoravske Doly (CMD). The new CFB's were designed to meet the overall steam demands specified by ECKG. The CFB's design features include in-furnace heat transfer surface and a split backpass that utilizes a biasing damper to allow for control of both the superheat and reheat steam temperatures. The various CFB auxiliary systems will be discussed in the paper as well as the flue gas particulate collection equipment.« less

  4. HAZARDS OF THERMAL EXPANSION FOR RADIOLOGICAL CONTAINER ENGULFED IN FIRE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Donna Post Guillen

    2013-05-01

    Fire accidents pose a serious threat to nuclear facilities. It is imperative that transport casks or shielded containers designed to transport/contain radiological materials have the ability to withstand a hypothetical fire. A numerical simulation was performed for a shielded container constructed of stainless steel and lead engulfed in a hypothetical fire as outlined by 10 CFR §71.73. The purpose of this analysis was to determine the thermal response of the container during and after the fire. The thermal model shows that after 30 minutes of fire, the stainless steel will maintain its integrity and not melt. However, the lead shieldingmore » will melt since its temperature exceeds the melting point. Due to the method of construction of the container under consideration, ample void space must be provided to allow for thermal expansion of the lead upon heating and melting, so as to not overstress the weldment.« less

  5. Verification study of an emerging fire suppression system

    DOE PAGES

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.; ...

    2016-01-01

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation andmore » mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.« less

  6. Verification study of an emerging fire suppression system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation andmore » mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.« less

  7. Innovative Clean Coal Technology (ICCT). Demonstration of Selective Catalytic Reduction (SCR) technology for the control of nitrogen oxide (NO{sub x}) emissions from high-sulfur coal-fired boilers: Volume 1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-10-01

    The objective of this project is to demonstrate and evaluate commercially available Selective Catalytic Reduction (SCR) catalysts from U.S., Japanese and European catalyst suppliers on a high-sulfur U.S. coal-fired boiler. SCR is a post-combustion nitrogen oxide (NO.) control technology that involves injecting ammonia into the flue gas generated from coal combustion in an electric utility boiler. The flue gas containing ammonia is then passed through a reactor that contains a specialized catalyst. In the presence of the catalyst, the ammonia reacts with NO. to convert it to nitrogen and water vapor. Although SCR is widely practiced in Japan and Europemore » on gas-, oil-, and low-sulfur coal- fired boilers, there are several technical uncertainties associated with applying SCR to U.S. coals. These uncertainties include: 1) potential catalyst deactivation due to poisoning by trace metal species present in U.S. coals that are not present in other fuels. 2) performance of the technology and effects on the balance-of- plant equipment in the presence of high amounts of SO{sub 2} and SO{sub 3}. 3) performance of a wide variety of SCR catalyst compositions, geometries and methods of manufacturer under typical high-sulfur coal-fired utility operating conditions. These uncertainties were explored by operating nine small-scale SCR reactors and simultaneously exposing different SCR catalysts to flue gas derived from the combustion of high sulfur U.S. coal. In addition, the test facility operating experience provided a basis for an economic study investigating the implementation of SCR technology.« less

  8. 14 CFR 25.865 - Fire protection of flight controls, engine mounts, and other flight structure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Design and Construction Fire Protection § 25.865 Fire protection of flight controls, engine mounts, and other flight structure. Essential flight controls, engine mounts, and other flight structures located in... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fire protection of flight controls, engine...

  9. 14 CFR 25.865 - Fire protection of flight controls, engine mounts, and other flight structure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Design and Construction Fire Protection § 25.865 Fire protection of flight controls, engine mounts, and other flight structure. Essential flight controls, engine mounts, and other flight structures located in... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fire protection of flight controls, engine...

  10. 14 CFR 25.865 - Fire protection of flight controls, engine mounts, and other flight structure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Design and Construction Fire Protection § 25.865 Fire protection of flight controls, engine mounts, and other flight structure. Essential flight controls, engine mounts, and other flight structures located in... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fire protection of flight controls, engine...

  11. 14 CFR 25.865 - Fire protection of flight controls, engine mounts, and other flight structure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Design and Construction Fire Protection § 25.865 Fire protection of flight controls, engine mounts, and other flight structure. Essential flight controls, engine mounts, and other flight structures located in... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fire protection of flight controls, engine...

  12. 14 CFR 25.865 - Fire protection of flight controls, engine mounts, and other flight structure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Design and Construction Fire Protection § 25.865 Fire protection of flight controls, engine mounts, and other flight structure. Essential flight controls, engine mounts, and other flight structures located in... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fire protection of flight controls, engine...

  13. 46 CFR 116.530 - Fire control plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Fire control plan. 116.530 Section 116.530 Shipping... and Embarkation Station Requirements § 116.530 Fire control plan. A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show...

  14. 46 CFR 116.530 - Fire control plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Fire control plan. 116.530 Section 116.530 Shipping... and Embarkation Station Requirements § 116.530 Fire control plan. A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show...

  15. 46 CFR 116.530 - Fire control plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Fire control plan. 116.530 Section 116.530 Shipping... and Embarkation Station Requirements § 116.530 Fire control plan. A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show...

  16. 46 CFR 116.530 - Fire control plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Fire control plan. 116.530 Section 116.530 Shipping... and Embarkation Station Requirements § 116.530 Fire control plan. A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show...

  17. 46 CFR 116.530 - Fire control plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Fire control plan. 116.530 Section 116.530 Shipping... and Embarkation Station Requirements § 116.530 Fire control plan. A fire control plan must be posted on the vessel in a location that is accessible and visible to all passengers. The plan must show...

  18. Report: landfill alternative daily cover: conserving air space and reducing landfill operating cost.

    PubMed

    Haughey, R D

    2001-02-01

    Title 40, Part 258 of the Code of Federal Regulations, Solid Waste Disposal Facility Criteria, commonly referred to as Subtitle D, became effective on October 9, 1993. It establishes minimum criteria for solid waste disposal facility siting, design, operations, groundwater monitoring and corrective action, and closure and postclosure maintenance, while providing EPA-approved state solid waste regulatory programs flexibility in implementing the criteria. Section 258.21(a) [40 CFR 258.21(a)] requires owners or operators of municipal solid waste landfill (MSWLF) units to cover disposed solid waste with 30cm of earthen material at the end of the operating day, or at more frequent intervals, if necessary, to control disease vectors, fires, odours, blowing litter, and scavenging. This requirement is consistent with already existing solid waste facility regulations in many states. For many MSWLFs, applying daily cover requires the importation of soil which increases landfill operating costs. Daily cover also uses valuable landfill air space, reducing potential operating revenue and the landfill's operating life. 40 CFR 258.21 (b) allows the director of an approved state to approve alternative materials of an alternative thickness if the owner or operator demonstrates that the alternative material and thickness will control disease vectors, fires, odours, blowing litter, and scavenging without presenting a threat to human health and the environment. Many different types of alternative daily cover (ADC) are currently being used, including geosynthetic tarps, foams, garden waste, and auto shredder fluff. These materials use less air space than soil and can reduce operating costs. This paper discusses the variety of ADCs currently being used around the country and their applicability to different climates and operating conditions, highlighting the more unusual types of ADC, the types of demonstrations necessary to obtain approval of ADC, and the impact on landfill air space and operating costs of ADC use.

  19. Applications of multi-spectral imaging: failsafe industrial flame detector

    NASA Astrophysics Data System (ADS)

    Wing Au, Kwong; Larsen, Christopher; Cole, Barry; Venkatesha, Sharath

    2016-05-01

    Industrial and petrochemical facilities present unique challenges for fire protection and safety. Typical scenarios include detection of an unintended fire in a scene, wherein the scene also includes a flare stack in the background. Maintaining a high level of process and plant safety is a critical concern. In this paper, we present a failsafe industrial flame detector which has significant performance benefits compared to current flame detectors. The design involves use of microbolometer in the MWIR and LWIR spectrum and a dual band filter. This novel flame detector can help industrial facilities to meet their plant safety and critical infrastructure protection requirements while ensuring operational and business readiness at project start-up.

  20. Learning by Erring: fire!

    PubMed

    Bjugn, Roger; Hansen, Jarle

    2013-08-01

    Biorepositories may be affected by a number of emergencies ranging from bad publicity to natural disasters, and biorepositories should have plans for handling such situations. The emergency management process includes all phases from mitigation to recovery. Fire is one disaster that may cause extensive damage to both physical structures and humans. In this article, we analyze events related to a fire in a storage facility for mechanical freezers. The analysis covers both the pre-crisis stage, the fire itself, and the post-crisis stage. Even the best intended planning cannot stop a crisis from happening. However, an open-minded analysis of the crisis with focus on learning and quality improvement can improve an organization's ability to handle the next emergency situation.

  1. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida prepare to participate in a training exercise at the Shuttle Landing Facility. A small fire is burning near a mock-up of a plane during the training exercise. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  2. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters, wearing protective gear, use hoses to put out a fire burning close to a mock-up of a small plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  3. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters, wearing protective gear, use hoses to put out a fire burning near the mock-up of a small plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  4. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters, wearing protective gear, use hoses to put out a fire burning on a mock-up of a small plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  5. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters use fire trucks and hoses to extinguish flames burning on and around a mock-up of a small plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  6. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - During a training exercise, Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida use hoses to put out a fire burning on a mock-up of a small plane at the Shuttle Landing Facility. They are wearing protective gear for the training exercise. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  7. Flow Effects on the Flammability Diagrams of Solid Fuels

    NASA Technical Reports Server (NTRS)

    Cordova, J. L.; Ceamanos, J.; Fernandez-Pello, A. C.; Long, R. T.; Torero, J. L.; Quintiere, J. G.

    1997-01-01

    A research program is currently underway with the final objective of developing a fundamental understanding of the controlling mechanisms underlying the flammability diagrams of solid combustible materials and their derived fire properties. Given that there is a high possibility of an accidental fire occurring in a space-based facility, understanding the fire properties of materials that will be used in such facilities is of critical importance. With this purpose, the flammability diagrams of the materials, as those produced by the Lateral Ignition and Flame Spread Test (LIFT) apparatus and by a new forced flow device, the Forced Flow Ignition and Flame Spread Test (FIST) apparatus, will be obtained. The specific objective of the program is to apply the new flammability apparatus, which will more accurately reflect the potential ambient conditions of space-based environments, to the characterization of the materials for space applications. This paper presents a parametric study of oxidizer flow effects on the ignition curve of the flammability diagrams of PMMA. The dependence of the ignition delay time on the external radiant flux and either the sample width (LIFT) or the flow velocity (FIST) has been studied. Although preliminary, the results indicate that natural and forced convection flow changes, affect the characteristics of the ignition curves of the flammability diagrams. The major effect on the ignition time appears to be due to convective transfer variations at the fuel surface. At high radiant fluxes or high flow velocities, however, it appears that gas phase processes become increasingly important, affecting the overall ignition delay time. A numerical analysis of the solid fuel heating and pyrolysis has also been developed. The theoretical predictions approximate the experiments well for conditions in which the gas phase induction time is negligible.

  8. Application of synthetic fire-resistant oils in oil systems of turbine equipment for NPPs

    NASA Astrophysics Data System (ADS)

    Galimova, L. A.

    2017-10-01

    Results of the investigation of the synthetic fire-resistant turbine oil Fyrquel-L state in oil systems of turbosets under their operation in the equipment and oil supply facilities of nuclear power plants (NPPs) are presented. On the basis of the analysis of the operating experience, it is established that, for reliable and safe operation of the turbine equipment, at which oil systems synthetic fire-resistant oils on the phosphoric acid esters basis are used, special attention should be paid to two main factors, namely, both the guarantee of the normalized oil water content under the operation and storage and temperature regime of the operation. Methods of the acid number maintenance and reduction are shown. Results of the analysis and investigation of influence of temperature and of the variation of the qualitative state of the synthetic fair-resistant oil on its water content are reported. It is shown that the fire-resistant turbine oils are characterized by high hydrophilicity, and, in distinction to the mineral turbine oils, are capable to contain a significant amount of dissolved water, which is not extracted under the use of separation technologies. It is shown that the more degradation products are contained in oil and higher acid number, the more amount of dissolved water it is capable to retain. It is demonstrated that the organization of chemical control of the total water content of fireresistant oils with the use of the coulometric method is an important element to support the reliable operation of oil systems. It is recommended to use automatic controls of water content for organization of daily monitoring of oil state in the oil system. Recommendations and measures for improvement of oil operation on the NPP, the water content control, the use of oil cleaning plants, and the oil transfer for storage during repair works are developed.

  9. Los Alamos County Fire Department LAFD: TA-55 PF-4 Facility Familiarization Tour, OJT 55260

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Victor Stephen

    Los Alamos National Laboratory (LANL) will conduct familiarization tours for Los Alamos County Fire Department (LAFD) personnel at the Plutonium Facility (PF-4) at Technical Area (TA)-55. These familiarization tours are official LANL business; the purpose of these tours is to orient the firefighters to the facility so that they can respond efficiently and quickly to a variety of emergency situations. This orientation includes the ingress and egress of the area and buildings, layout and organization of the facility, evacuation procedures and assembly points, and areas of concern within the various buildings at the facility. LAFD firefighters have the skills andmore » abilities to perform firefighting operations and other emergency response tasks that cannot be provided by other LANL personnel who have the required clearance level. This handout provides details of the information, along with maps and diagrams, to be presented during the familiarization tours. The handout will be distributed to the trainees at the time of the tour. A corresponding checklist will also be used as guidance during the familiarization tours to ensure that all required information is presented to LAFD personnel.« less

  10. Material Selection for Cable Gland to Improved Reliability of the High-hazard Industries

    NASA Astrophysics Data System (ADS)

    Vashchuk, S. P.; Slobodyan, S. M.; Deeva, V. S.; Vashchuk, D. S.

    2018-01-01

    The sealed cable glands (SCG) are available to ensure safest connection sheathed single wire for the hazard production facility (nuclear power plant and others) the same as pilot cable, control cables, radio-frequency cables et al. In this paper, we investigate the specifics of the material selection of SCG with the express aim of hazardous man-made facility. We discuss the safe working conditions for cable glands. The research indicates the sintering powdered metals cables provide the reliability growth due to their properties. A number of studies have demonstrated the verification of material selection. On the face of it, we make findings indicating that double glazed sealed units could enhance reliability. We had evaluated sample reliability under fire conditions, seismic load, and pressure containment failure. We used the samples mineral insulated thermocouple cable.

  11. Stockholm Arlanda Airport as a source of per- and polyfluoroalkyl substances to water, sediment and fish.

    PubMed

    Ahrens, Lutz; Norström, Karin; Viktor, Tomas; Cousins, Anna Palm; Josefsson, Sarah

    2015-06-01

    Fire training facilities are potential sources of per- and polyfluoroalkyl substances (PFASs) to the nearby environment due to the usage of PFAS-containing aqueous fire-fighting foams (AFFFs). The multimedia distribution of perfluoroalkyl carboxylates (PFCAs), perfluoroalkyl sulfonates (PFSAs), perfluorooctanesulfonamide (PFOSA) and 6:2 fluorotelomer sulfonate (FTSA) was investigated near a fire training facility at Stockholm Arlanda Airport in Sweden. The whole body burden of PFASs in European perch (Perca fluviatilis) was 334±80μg absolute and was distributed as follows: Gonad>liver≈muscle>blood>gill. The bioconcentration factor (BCF) and sediment/water partition coefficient (Kd) increased by 0.6-1.7 and 0.2-0.5 log units, respectively, for each additional CF2 moiety for PFCAs and PFSAs. PFAS concentrations in water showed no significant decreasing trend between 2009 and 2013 (p>0.05), which indicates that Stockholm Arlanda Airport may be an important source for long-term contamination of the nearby environment with PFASs. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Factors controlling seedling germination after fire in Mediterranean gorse shrublands. Implications for fire prescription.

    PubMed

    De Luis, M; Raventós, J; González-Hidalgo, J C

    2005-07-01

    In Western Mediterranean areas, fires are frequent in forests established on old croplands where woody resprouting species are scarce and post-fire regeneration is limited to obligate-seeder species, such as Mediterranean gorse (Ulex parviflorus), that accumulate a great deal of fine dry fuel, increasing the risk of other severe fires. Under these conditions, fuel control techniques are required in order to prevent fires of high intensity and severity and the subsequent economic and ecological damage. Prescribed fires present an alternative to fuel control, and recent studies demonstrate that, under optimum climatic conditions, fire-line intensity values fall within the limits of those recommended for fire prescription. However, a better understanding of the consequences of fire on the regeneration of vegetation is needed in order to evaluate the suitability of prescribed fires as a technique for fuel reduction in Mediterranean gorse ecosystems. This paper analyses the factors controlling seedling germination after fire to make an evaluation from an ecological perspective of whether fire prescription is a suitable technique for fuel control in mature Mediterranean gorse shrublands. The results show that small differences in the composition of vegetation play a decisive role in fire behaviour, and have a decisive influence on the system's capacity for regeneration. Fire severity is low in mixed Mediterranean gorse communities with a low continuity of dead fine fuel (including Cistus sp., Rosmarinus sp., etc.) and fire creates a wide range of microhabitats where seedling emergence is high. In contrast, where U. parviflorus is more dominant, fire severity is higher and the regeneration of vegetation could be hindered. Our conclusions suggest that detailed studies of the composition of plant communities are required in order to decide whether prescribed burning should be applied.

  13. Multi-scale controls of historical forest-fire regimes: new insights from fire-scar networks

    Treesearch

    Donald A. Falk; Emily K. Heyerdahl; Peter M. Brown; Calvin Farris; Peter Z. Fule; Donald McKenzie; Thomas W. Swetnam; Alan H. Taylor; Megan L. Van Horne

    2011-01-01

    Anticipating future forest-fire regimes under changing climate requires that scientists and natural resource managers understand the factors that control fire across space and time. Fire scars—proxy records of fires, formed in the growth rings of long-lived trees—provide an annually accurate window into past low-severity fire regimes. In western North America, networks...

  14. 38 CFR 17.63 - Approval of community residential care facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... patients in the event of fire or other emergency. Incorporation by reference of these materials was..., exclusive of closet space, at least 100 square feet for a single-resident room, or 80 square feet for each... independent living situation. (i) Records. (1) The facility must maintain records on each resident in a secure...

  15. Aid for Facilities

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2009-01-01

    Even before the state fire marshal ordered the Somersworth (N.H.) School District in 2007 to abandon the top two floors of Hilltop Elementary School because of safety concerns, folks in the city of 12,000 had been debating whether the aging facility should be replaced--and how to pay for it. Finally, in February 2009, the city council approved…

  16. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... that have been incorporated to minimize loss. The report should make specific reference to appropriate.... Retrofitting may require modifications to the piping system to ensure that adequate water capacity and pressure... storage facilities, boiler rooms or rooms containing equipment operating with a fuel supply (such as...

  17. 78 FR 5556 - Public Hearing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... Energy USA Inc. (Towanda Creek--Franklin Township Volunteer Fire Department), Franklin Township, Bradford.... 20081210). 19. Project Sponsor and Facility: Titanium Metals Corporation (TIMET), Caernarvon Township...

  18. Fire suppression system of a small-scale LNG loading facility at PT Badak NGL

    NASA Astrophysics Data System (ADS)

    Yustiarza, Farhan Hilmyawan

    2017-03-01

    LNG progressively become favorable energy to replace oil-based fuel due to lower cost and more environment-friendly. In order to support an emerging LNG demands in Kalimantan, PT Badak NGL, one of the leading LNG Company in the world, develops the land-transported LNG loading facility. This facility performs loading the LNG into a small-scale tank (ISO Tank) with 20 m3 capacities. Safety reviews over this facility were conducted. Based on these reviews, the LNG filling station requires supplemental safeguards, such as LNG spill containment and firefighting foam system besides firewater system and dry chemical system. The spill containment provides holding LNG spill within the limits of plant property, while the high expansion foam system deals to minimize the vaporization rate to prevent a fire incident. This paper mainly discusses designing of such supplemental safeguards. The requirement of the spill containment is 20 m3 (6.3 × 3.3 × 2.0) m and the foam system should be capable generating foam at least 40 m3/min.

  19. Identifying Indicators of State Change and Forecasting Future Vulnerability in Alaskan Boreal Ecosystems

    DTIC Science & Technology

    2016-08-01

    ice have catastrophic effects on facilities, infrastructure, and military testing and training. Permafrost temperature , thickness, and geographic...treeline) and fire severity (~0 to ~100% SOL consumption ), they provide an excellent suite of sites to test and quantify the effects of fire severity...stages .........................59 Table 6.1. Variables included in explanatory matrix for black spruce dominance ............68 Table 6.2. Mixed effect

  20. Identifying Indicators of State Change and Forecasting Future Vulnerability in Alaskan Boreal Ecosystems

    DTIC Science & Technology

    2016-08-01

    catastrophic effects on facilities, infrastructure, and military testing and training. Permafrost temperature , thickness, and geographic continuity...and fire severity (~0 to ~100% SOL consumption ), they provide an excellent suite of sites to test and quantify the effects of fire severity on plant...59 Table 6.1. Variables included in explanatory matrix for black spruce dominance ............68 Table 6.2. Mixed effect model

  1. Analysis of the Large Urban Fire Environment. Part 1. Theory

    DTIC Science & Technology

    1982-07-01

    the fire. It is the buoyancy-generated pressure forces, and not diffusive entrainment, that control the low-level induction of ambient air into the...18-- IV. RESULTS FLAMBEAU FIRES The multiple-fuel-bed Flambeau fires (Countryman, 1969; Palmer, 1981] were large, controlled burns conducted to...Station Northern Forest Fire Laboratory Alexandria, VA 22314 (12) Missoula, MT 59801 (1) Department of Defense 2. Mr. Clay F. Butler Command and Control

  2. Digitally controlled twelve-pulse firing generator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berde, D.; Ferrara, A.A.

    1981-01-01

    Control System Studies for the Tokamak Fusion Test Reactor (TFTR) indicate that accurate thyristor firing in the AC-to-DC conversion system is required in order to achieve good regulation of the various field currents. Rapid update and exact firing angle control are required to avoid instabilities, large eddy currents, or parasitic oscillations. The Prototype Firing Generator was designed to satisfy these requirements. To achieve the required /plus or minus/0.77/degree/firing accuracy, a three-phase-locked loop reference was designed; otherwise, the Firing Generator employs digital circuitry. The unit, housed in a standard CAMAC crate, operates under microcomputer control. Functions are performed under program control,more » which resides in nonvolatile read-only memory. Communication with CICADA control system is provided via an 11-bit parallel interface.« less

  3. Wildland fire management. Volume 2: Wildland fire control 1985-1995. [satellite information system for California fire problems

    NASA Technical Reports Server (NTRS)

    Saveker, D. R. (Editor)

    1973-01-01

    The preliminary design of a satellite plus computer earth resources information system is proposed for potential uses in fire prevention and control in the wildland fire community. Suggested are satellite characteristics, sensor characteristics, discrimination algorithms, data communication techniques, data processing requirements, display characteristics, and costs in achieving the integrated wildland fire information system.

  4. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  5. 44 CFR 206.221 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Utility means buildings, structures, or systems of energy, communication, water supply, sewage collection.... Irrigation facilities include water for fire suppression, generating and supplying electricity, and drinking...

  6. 44 CFR 206.221 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Utility means buildings, structures, or systems of energy, communication, water supply, sewage collection.... Irrigation facilities include water for fire suppression, generating and supplying electricity, and drinking...

  7. 44 CFR 206.221 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Utility means buildings, structures, or systems of energy, communication, water supply, sewage collection.... Irrigation facilities include water for fire suppression, generating and supplying electricity, and drinking...

  8. Identifying the Threshold of Dominant Controls on Fire Spread in a Boreal Forest Landscape of Northeast China

    PubMed Central

    Liu, Zhihua; Yang, Jian; He, Hong S.

    2013-01-01

    The relative importance of fuel, topography, and weather on fire spread varies at different spatial scales, but how the relative importance of these controls respond to changing spatial scales is poorly understood. We designed a “moving window” resampling technique that allowed us to quantify the relative importance of controls on fire spread at continuous spatial scales using boosted regression trees methods. This quantification allowed us to identify the threshold value for fire size at which the dominant control switches from fuel at small sizes to weather at large sizes. Topography had a fluctuating effect on fire spread across the spatial scales, explaining 20–30% of relative importance. With increasing fire size, the dominant control switched from bottom-up controls (fuel and topography) to top-down controls (weather). Our analysis suggested that there is a threshold for fire size, above which fires are driven primarily by weather and more likely lead to larger fire size. We suggest that this threshold, which may be ecosystem-specific, can be identified using our “moving window” resampling technique. Although the threshold derived from this analytical method may rely heavily on the sampling technique, our study introduced an easily implemented approach to identify scale thresholds in wildfire regimes. PMID:23383247

  9. Evaluation of the 183-D Water Filtration Facility for Bat Roosts and Development of a Mitigation Strategy, 100-D Area, Hanford Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lindsey, C. T.; Gano, K. A.; Lucas, J. G.

    The 183-D Water Filtration Facility is located in the 100-D Area of the Hanford Site, north of Richland, Washington. It was used to provide filtered water for cooling the 105-D Reactor and supplying fire-protection and drinking water for all facilities in the 100-D Area. The facility has been inactive since the 1980s and is now scheduled for demolition. Therefore, an evaluation was conducted to determine if any part of the facility was being used as roosting habitat by bats.

  10. Accidental fires in clinical laboratories.

    PubMed

    Hoeltge, G A; Miller, A; Klein, B R; Hamlin, W B

    1993-12-01

    The National Fire Protection Association, Quincy, Mass, estimates that 169 fires have occurred annually in health care, medical, and chemical laboratories. On the average, there are 13 civilian injuries and $1.5 million per year in direct property damage. Most fires in which the cause or ignition source can be identified originate in malfunctioning electrical equipment (41.6%) or in the facility's electrical distribution system (14.7%). The prevalence of fire safety deficiencies was measured in the College of American Pathologists Laboratory Accreditation Program. Of the 1732 inspected laboratories, 5.5% lacked records of electrical receptacle polarity and ground checks in the preceding year. Of these inspected laboratories, 4.7% had no or incomplete documentation of electrical safety checks on laboratory instruments. There was no evidence of quarterly fire exit drills in 9% of the laboratories. Deficiencies were also found in precautionary labeling (6.8%), in periodic review of safe work practices (4.2%), in the use of safety cans (3.7%), and in venting of flammable liquid storage areas (2.8%). Fire preparedness would be improved if all clinical laboratories had smoke detectors and automatic fire-extinguishing systems. In-service training courses in fire safety should be targeted to the needs of specific service areas.

  11. Fires in refugee and displaced persons settlements: the current situation and opportunities to improve fire prevention and control

    PubMed Central

    Kazerooni, Yasaman; Gyedu, Adam; Burnham, Gilbert; Nwomeh, Benedict; Charles, Anthony; Mishra, Brijesh; Kuah, Solomon S; Kushner, Adam L; Stewart, Barclay T

    2015-01-01

    Introduction We aimed to describe the burden of fires in displaced persons settlements and identify interventions/innovations that might address gaps in current humanitarian guidelines. Methods We performed a systematic review of: i) academic and non-academic literature databases; and ii) guidelines from leading humanitarian agencies/initiatives regarding fire prevention/control. Results Of the 1,521 records retrieved, 131 reports described settlement fires in 31 hosting countries since 1990. These incidents resulted in 487 deaths, 790 burn injuries, displacement of 382,486 individuals and destruction of 50,509 shelters. There was a 25-fold increase in the rate of settlement fires from 1990 to 2015 (0.002 to 0.051 per 100,000 refugees, respectively). Only 4 of the 15 leading humanitarian agencies provided recommendations about fire prevention/control strategies. Potentially useful interventions/innovations included safer stoves (e.g. solar cookers) and fire retardant shelter materials. Conclusion The large and increasing number of fires in displaced persons settlements highlights the need to redress gaps in humanitarian fire prevention/control guidelines. The way forward includes: i) developing consensus among aid agencies regarding fire prevention/control strategies; ii) evaluating the impact of interventions/innovations on the burden of fires; and iii) engaging agencies in a broader discussion about protecting camp residents from armed groups. PMID:26818955

  12. Fires in refugee and displaced persons settlements: The current situation and opportunities to improve fire prevention and control.

    PubMed

    Kazerooni, Yasaman; Gyedu, Adam; Burnham, Gilbert; Nwomeh, Benedict; Charles, Anthony; Mishra, Brijesh; Kuah, Solomon S; Kushner, Adam L; Stewart, Barclay T

    2016-08-01

    We aimed to describe the burden of fires in displaced persons settlements and identify interventions/innovations that might address gaps in current humanitarian guidelines. We performed a systematic review of: (i) academic and non-academic literature databases; and (ii) guidelines from leading humanitarian agencies/initiatives regarding fire prevention/control. Of the 1521 records retrieved, 131 reports described settlement fires in 31 hosting countries since 1990. These incidents resulted in 487 deaths, 790 burn injuries, displacement of 382,486 individuals and destruction of 50,509 shelters. There was a 25-fold increase in the rate of settlement fires from 1990 to 2015 (0.002-0.051 per 100,000 refugees, respectively). Only 4 of the 15 leading humanitarian agencies provided recommendations about fire prevention/control strategies. Potentially useful interventions/innovations included safer stoves (e.g. solar cookers) and fire retardant shelter materials. The large and increasing number of fires in displaced persons settlements highlights the need to redress gaps in humanitarian fire prevention/control guidelines. The way forward includes: (i) developing consensus among aid agencies regarding fire prevention/control strategies; (ii) evaluating the impact of interventions/innovations on the burden of fires; and (iii) engaging agencies in a broader discussion about protecting camp residents from armed groups. Copyright © 2015 Elsevier Ltd and ISBI. All rights reserved.

  13. 43 CFR 6304.22 - What special provisions apply to control of fire, insects, and diseases?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of fire, insects, and diseases? 6304.22 Section 6304.22 Public Lands: Interior Regulations Relating... apply to control of fire, insects, and diseases? BLM may prescribe measures to control fire, noxious weeds, non-native invasive plants, insects, and diseases. BLM may require restoration concurrent with or...

  14. 43 CFR 6304.22 - What special provisions apply to control of fire, insects, and diseases?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of fire, insects, and diseases? 6304.22 Section 6304.22 Public Lands: Interior Regulations Relating... apply to control of fire, insects, and diseases? BLM may prescribe measures to control fire, noxious weeds, non-native invasive plants, insects, and diseases. BLM may require restoration concurrent with or...

  15. 43 CFR 6304.22 - What special provisions apply to control of fire, insects, and diseases?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of fire, insects, and diseases? 6304.22 Section 6304.22 Public Lands: Interior Regulations Relating... apply to control of fire, insects, and diseases? BLM may prescribe measures to control fire, noxious weeds, non-native invasive plants, insects, and diseases. BLM may require restoration concurrent with or...

  16. 43 CFR 6304.22 - What special provisions apply to control of fire, insects, and diseases?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of fire, insects, and diseases? 6304.22 Section 6304.22 Public Lands: Interior Regulations Relating... apply to control of fire, insects, and diseases? BLM may prescribe measures to control fire, noxious weeds, non-native invasive plants, insects, and diseases. BLM may require restoration concurrent with or...

  17. PEO Ammunition Systems Portfolio Book 2012-2013

    DTIC Science & Technology

    2011-02-02

    assembly. Aluminum ogive contains firing pin, a rubber anti-creep spring and M550 fuze escapement assembly and is threaded to projectile body...51 The Mortar Weapons and Fire Control Family M95/M96 Mortar Fire Control System (MFCS) – Mounted...52 M150/M151 Mortar Fire Control System Dismounted (MFCS-D

  18. The Science of Prescribed Fire: to Enable a Different Kind of Control

    Treesearch

    Timothy E. Paysen; Marcia G. Narog; Jack D. Cohen

    1998-01-01

    A paradigm shift from fire suppression to fire suppression and prescription requires a shift in emphasis from simply controlling wildfire occurrence and spread to one that includes controlling characteristics of prescribed fire. Suppression focuses on preventing unwanted effects that might result from wildfire occurrence. Prescription promotes desired effects by...

  19. 7 CFR 301.81-11 - Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 5 2014-01-01 2014-01-01 false Imported fire ant detection, control, exclusion, and..., DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Imported Fire Ant Quarantine and Regulations § 301.81-11 Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

  20. 7 CFR 301.81-11 - Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 5 2011-01-01 2011-01-01 false Imported fire ant detection, control, exclusion, and..., DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Imported Fire Ant Quarantine and Regulations § 301.81-11 Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

  1. 7 CFR 301.81-11 - Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Imported fire ant detection, control, exclusion, and..., DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Imported Fire Ant Quarantine and Regulations § 301.81-11 Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

  2. 7 CFR 301.81-11 - Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 5 2013-01-01 2013-01-01 false Imported fire ant detection, control, exclusion, and..., DEPARTMENT OF AGRICULTURE DOMESTIC QUARANTINE NOTICES Imported Fire Ant Quarantine and Regulations § 301.81-11 Imported fire ant detection, control, exclusion, and enforcement program for nurseries producing...

  3. Key Problems of Fire Safety Enforcement in Traffic and Communication Centers (TCC)

    NASA Astrophysics Data System (ADS)

    Medyanik, M.; Zosimova, O.

    2017-10-01

    A Traffic and Communication Center (TCC) means facilities designed and used to distribute and redirect flows of humans and motor vehicles while they get serviced and operate. This paper sets forth the basic problems of fire safety enforcement on the TCC, and the causes that slow down human and vehicle traffic speeds. It proposes ways to solve the problems of fire safety enforcement on the TCC, in the Russian Federation and elsewhere. Engineering solutions are proposed for TCC design, with key outlooks of TCC future development as an alternative way to organize access in transportation.

  4. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida practice firefighting skills at the Shuttle Landing Facility. A firefighter dons protective gear to prepare for the training simulation. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  5. Reduced frequency and severity of residential fires following delivery of fire prevention education by on-duty fire fighters: cluster randomized controlled study.

    PubMed

    Clare, Joseph; Garis, Len; Plecas, Darryl; Jennings, Charles

    2012-04-01

    In 2008, Surrey Fire Services, British Columbia, commenced a firefighter-delivered, door-to-door fire-prevention education and smoke alarm examination/installation initiative with the intention of reducing the frequency and severity of residential structure fires in the City of Surrey. High-risk zones within the city were identified and 18,473 home visits were undertaken across seven temporal delivery cohorts (13.8% of non-apartment dwellings in the city). The frequency and severity of fires pre- and post- the home visit intervention was examined in comparison to randomized high-risk cluster controls. Overall, the frequency of fires was found to have reduced in the city overall, however, the reduction in the intervention cohorts was significantly larger than for controls. Furthermore, when fires did occur within the intervention cohorts, smoke detectors were activated more frequently and the fires were confined to the object of origin more often post-home visits. No equivalent pattern was observed for the cluster control. On-duty fire fighters can reduce the frequency and severity of residential fires through targeted, door-to-door distribution of fire prevention education in high-risk areas. Copyright © 2012 Elsevier Ltd. All rights reserved.

  6. KSC-06pd1422

    NASA Image and Video Library

    2006-07-04

    KENNEDY SPACE CENTER, FLA. - In Firing Room 4 of the Launch Control Center, Shuttle Launch Director Mike Leinbach (center) and Center Director Jim Kennedy congratulate the launch team after the successful launch of Space Shuttle Discovery on mission STS-121. The launch was the first ever to take place on Independence Day. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett

  7. KSC-06pd1415

    NASA Image and Video Library

    2006-07-04

    KENNEDY SPACE CENTER, FLA. - In Firing Room 4 of the Launch Control Center, Kennedy Space Center Director Jim Kennedy watches one of the computer screens as the countdown heads for launch of Space Shuttle Discovery on mission STS-121. Liftoff was on-time at 2:38 p.m. EDT. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett

  8. KSC-06pd1416

    NASA Image and Video Library

    2006-07-04

    KENNEDY SPACE CENTER, FLA. - In Firing Room 4 of the Launch Control Center, the launch team stands to view the liftoff of Space Shuttle Discovery on mission STS-121 -- the first ever Independence Day launch of a space shuttle. Liftoff was on-time at 2:38 p.m. EDT. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett

  9. KSC-06pd1417

    NASA Image and Video Library

    2006-07-04

    KENNEDY SPACE CENTER, FLA. - Workers in Firing Room 4 of the Launch Control Center take advantage of the view as Space Shuttle Discovery lifts off on mission STS-121 -- the first ever Independence Day launch of a space shuttle. Liftoff was on-time at 2:38 p.m. EDT. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett

  10. KSC-06pd1421

    NASA Image and Video Library

    2006-07-04

    KENNEDY SPACE CENTER, FLA. - In Firing Room 4 of the Launch Control Center, Shuttle Launch Director Mike Leinbach (center) congratulates the launch team after the successful launch of Space Shuttle Discovery on mission STS-121. The launch was the first ever to take place on Independence Day. At far right is Center Director Jim Kennedy. During the 12-day mission, the STS-121 crew of seven will test new equipment and procedures to improve shuttle safety, as well as deliver supplies and make repairs to the International Space Station. Landing is scheduled for July 16 or 17 at Kennedy's Shuttle Landing Facility. Photo credit: NASA/Kim Shiflett

  11. The 10 MWe Solar Thermal Central Receiver Pilot Plant: Solar facilities design integration. Pilot-plant station manual (RADL Item 2-1). Volume 1: System description

    NASA Astrophysics Data System (ADS)

    1982-09-01

    The complete Barstow Solar Pilot Plant is described. The plant requirements and general description are presented, the mechanical, electric power, and control and instrumentation systems as well as civil engineering and structural aspects and the station buildings are described. Included in the mechanical systems are the heliostats, receiver, thermal storage system, beam characterization system, steam, water, nitrogen, and compressed air systems, chemical feed system, fire protection system, drains, sumps and the waste disposal systems, and heating, ventilating, and air conditioning systems.

  12. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    NASA Ares I-X Assistant Launch Director Pete Nickolenko, left, and NASA Ares I-X Launch Director Ed Mango monitor the launch countdown from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the planned launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  13. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Constellation Program manager Jeff Hanley, Ares I-X Launch Director Ed Mango, Ares I-X mission manager Bob Ess, Ground Operations Manager Philip "Pepper" Phillips, review the latest data in Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  14. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Ares I-X Assistant Launch Director Pete Nickolenko, Ground Operations Manager Philip "Pepper" Phillips, Ares I-X Launch Director Ed Mango, and Constellation Program manager Jeff Hanley review the latest weather radar from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  15. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X Launch Director Ed Mango, left, laughs as NASA Ares I-X Assistant Launch Director Pete Nickolenko looks out the window of Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center prior to the launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  16. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida review procedures after participating in a training exercise at the Shuttle Landing Facility. During the training simulation, firefighters used fire trucks and hoses to extinguish flames burning on and around a mock-up of a small plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  17. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters, wearing protective gear, use hoses to put out a fire burning near the mock-up of a small plane as another firefighter checks inside the plane. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  18. Using a stochastic model and cross-scale analysis to evaluate controls on historical low-severity fire regimes

    Treesearch

    Maureen C. Kennedy; Donald McKenzie

    2010-01-01

    Fire-scarred trees provide a deep temporal record of historical fire activity, but identifying the mechanisms therein that controlled landscape fire patterns is not straightforward. We use a spatially correlated metric for fire co-occurrence between pairs of trees (the Sørensen distance variogram), with output from a neutral model for fire history, to infer the...

  19. DEVELOPMENT AND DEMONSTRATION OF NOVEL LOW-NOx BURNERS IN THE STEEL INDUSTRY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cygan, David

    Gas Technology Institute (GTI), together with Hamworthy Peabody Combustion Incorporated (formerly Peabody Engineering Corporation), the University of Utah, and Far West Electrochemical have developed and demonstrated an innovative combustion system suitable for natural gas and coke-oven gas firing within the steel industry. The combustion system is a simple, low-cost, energy-efficient burner that can reduce NOx by more than 75%. The U.S. steel industry needs to address NOx control at its steelmaking facilities. A significant part of NOx emissions comes from gas-fired boilers. In steel plants, byproduct gases – blast furnace gas (BFG) and coke-oven gas (COG) – are widely usedmore » together with natural gas to fire furnaces and boilers. In steel plants, natural gas can be fired together with BFG and COG, but, typically, the addition of natural gas raises NOx emissions, which can already be high because of residual fuel-bound nitrogen in COG. The Project Team has applied its expertise in low-NOx burners to lower NOx levels for these applications by combining advanced burner geometry and combustion staging with control strategies tailored to mixtures of natural gas and byproduct fuel gases. These methods reduce all varieties of NOx – thermal NOx produced by high flame temperatures, prompt NOx produced by complex chain reactions involving radical hydrocarbon species and NOx from fuel-bound nitrogen compounds such as ammonia found in COG. The Project Team has expanded GTI’s highly successful low-NOx forced internal recirculation (FIR) burner, previously developed for natural gas-fired boilers, into facilities that utilize BFG and COG. For natural gas firing, these burners have been shown to reduce NOx emissions from typical uncontrolled levels of 80-100 vppm to single-digit levels (9 vppm). This is done without the energy efficiency penalties incurred by alternative NOx control methods, such as external flue gas recirculation (FGR), water injection, and selective non-catalytic reduction. The FIR burner was previously demonstrated on firetube and watertube boilers, and these units are still operating at several industrial and commercial boiler sites in sizes ranging from 2.5 to 60 million Btu/h. This report covers the development of an innovative combustion system suitable for natural gas or coke-oven gas firing within the steel industry. The prototype FIR burner was evaluated on a 20 million Btu/h watertube boiler. Acceptable burner performance was obtained when firing natural gas and simulated coke-oven gas doped with ammonia. The laboratory data reveals a direct relationship between NOx formation and the ammonia concentration in the fuel. In addition, NOx formation increases as the primary stoichiometric ratio (PSR) increases. Representative ammonia concentrations, as documented in the steel industry, ranged from 200 to 500 vppm. When the laboratory burner/boiler was operated with 500 vppm ammonia in the fuel, NOx emissions ranged from 50 to 75 vppm. This, conservatively, is 75% less than state-of-the-art burner performance. When the burner is operated with 200 vppm ammonia in the fuel, the corresponding NOx emissions would range from 30 to 45 vppm, 84% less than present burner technology. During field evaluation on a 174 million Btu/h industrial prototype burner both natural gas and actual COG from on-site generation were tested. Despite the elevated hydrogen cyanide and ammonia content in the COG throughout the test program, the FIR burner showed an improvement over baseline emissions. At full load; 167 million Btu/h, NOx emissions were relatively low at 169 vppm. This represents a 30% reduction compared to baseline emissions not accounting for the higher hydrogen cyanide content in the COG. CO emissions remained below 20 vppm and were stable across the firing range. This represents a 68% reduction compared to baseline CO emissions. When firing natural gas, emissions were stable as firing rate increased over the range. At low fire; 45 million Btu/h, NOx emissions where 33 vppm and increased at full load; 144 million Btu/h, to 49 vppm. CO emissions fluctuated with the oxygen content and remained below 135 vppm during all tests. The boiler’s maximum output was not achieved due to a limitation dictated by the host site natural gas supply. The FIR burner benefits the public by simultaneously addressing the problems of air pollution and energy conservation through a low-NOx combustion technology that does not increase energy consumption. Continuing activities include the negotiation of a license with Hamworthy Peabody Combustion, Incorporated (Hamworthy Peabody) to commercialize the FIR burner for steel industry applications. Hamworthy Peabody is one of the largest U.S. manufacturers of combustion equipment for boilers in the Steel Industry, and has stated their intention to commercialize the FIR burner.« less

  20. Industrial hygiene walk-through survey report of E. I. Dupont de Nemours and Company, Inc. , Chocolate Bayou Plant, Alvin, Texas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fajen, J.M.

    1985-05-01

    A walkthrough survey of EI duPont deNemours and Company, Incorporated, Alvin, Texas was conducted in November, 1984. The purpose of the survey was to obtain information on the 1,3-butadiene monomer manufacturing process and the potential for exposure. The facility manufactured a crude product stream containing 1,3-butadiene as a coproduct of its ethylene process. The crude was refined to a 99.5% 1,3-butadiene product. The refining process occurred in a closed system, tightly maintained for economic, fire, and health-hazard reasons. The product was transferred by way of a pipeline to storage spheres for later transport off site. The facility used an open-loopmore » cylinder (bomb) technique for quality control sampling. All pumps were equipped with single mechanical seals, which were in the process of being replaced by tandem seals. Since 1962, the facility had experienced process changes and three changes of ownership. Because of these changes, records from previous owners of industrial hygiene monitoring were not available. Job titles identified as having potential exposure were processors, wage employee supervisors, production engineers, and laboratory technicians. The author concludes that a closed-loop manual quality-control sampling system should be installed to reduce exposure from this source.« less

  1. Air Quality Management Alternatives: United States Air Force Firefighter Training Facilities

    DTIC Science & Technology

    1988-01-01

    Pollution at LAX, JFK , and ORD," Impact of Aircraft Emissions on Air Quality in the Vicinity of Airports , Volume II, FAA-EE-80-09B, Federal...developed and applied . This method enabled fire prevention, and environmental management experts and professionals to provide data, opinions, and to...methodology utilizing questionnaires, interviews, and site visits is developed and applied . This method enabled fire prevention, and environmental

  2. A Tool for Rating the Resilience of Critical Infrastructures in Extreme Fires

    DTIC Science & Technology

    2014-05-01

    provide a tool for NRC to help the Canadian industry to develop extreme fire protection materials and technologies for critical infrastructures. Future...supported by the Canadian Safety and Security Program (CSSP) which is led by Defence Research and Development Canada’s Centre for Security Science, in...in oil refinery and chemical industry facilities. The only available standard in North America that addresses the transportation infrastructure is

  3. Removal of Invasive Fire-Prone Grasses to Increase Training Lands in the Pacific

    DTIC Science & Technology

    2008-09-01

    Boone Kauffman. U.S. Forest Service. Pacific Northwest Research Center. Hilo . Hawaii . SWCA, Inc. 39 SWCA also acknowledges Amy Brown Curtis...Marine Corps Base Hawaii (MCBH), Marine Corps Training Area Bellows (MCTAB), Army installations Makua Valley, Schofield Barracks, Pohakuloa Training...Area, the Hawaii Army National Guard facility at Diamond Head Crater, and at the Naval Magazine on the Island of Guam. Invasive, fire-prone

  4. Response Mechanism: Blast/Fire Interactions.

    DTIC Science & Technology

    1983-11-01

    A WORK UNIT NUMBERS University of Notre Dame Notre Dame, IN L FEMA WU No. 2564H ItI. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Fedqral...Fires 9 Class A Fires 10 Control by Physics or Chemistry? 11 Conments 14 EXTINCTION AND IGNITION 15 Pool Fire 15 Analysis 17 Charring Solid Fire 21...post-explosion time, although its magnitude may make the efforts to control appear futile in the wake of a nuclear attack. There is considerable

  5. 76 FR 11339 - Update to NFPA 101, Life Safety Code, for State Home Facilities

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 51 RIN 2900-AN59 Update to NFPA 101, Life Safety Code..., Life Safety Code. The change is designed to assure that State Home facilities meet current industry- wide standards regarding life safety and fire safety. DATES: Effective Date: This final rule is...

  6. Three-phase foam analysis and development of a lab-scale foaming capacity and stability test for swine manure

    USDA-ARS?s Scientific Manuscript database

    Foam accumulation on the manure slurry at deep pit swine facilities has been linked to flash fire incidents, making it a serious safety concern for pork producers. In order to investigate this phenomenon, samples of swine manure were collected from over 50 swine production facilities in Iowa with va...

  7. 76 FR 11823 - Dominion Energy Kewaunee, Inc.; Kewaunee Power Station; Notice of Issuance of Renewed Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-03

    ... Additional 20-Year Period; Record of Decision Notice is hereby given that the U.S. Nuclear Regulatory... technical specifications. The notice also serves as the record of decision for the renewal of facility..., efficiency, wood-fired generation, and wind power; and non-renewal of the operating license. The factors...

  8. 30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. 'Gould Island Facilities, General Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3859-46, Y&D Drawing 190833. Scales 1' = 50' and 1' = 10'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI

  9. 78 FR 28949 - Fund Availability Under VA's Homeless Providers Grant and Per Diem Program (Rehabilitation)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Per Diem Program as a part of the effort to increase the useful life of the facilities of grantees... grantees are required to ensure that facilities rehabilitated under this NOFA meet the Life Safety Code of the National Fire and Protection Association. Please note, typically the Life Safety Code is more...

  10. 48 CFR 246.270-2 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...— (1) Fire protection; (2) Structural integrity; (3) Electrical systems; (4) Plumbing; (5) Water treatment; (6) Waste disposal; and (7) Telecommunications networks. (c) Existing host nation facilities...

  11. 48 CFR 246.270-2 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...— (1) Fire protection; (2) Structural integrity; (3) Electrical systems; (4) Plumbing; (5) Water treatment; (6) Waste disposal; and (7) Telecommunications networks. (c) Existing host nation facilities...

  12. 48 CFR 246.270-2 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...— (1) Fire protection; (2) Structural integrity; (3) Electrical systems; (4) Plumbing; (5) Water treatment; (6) Waste disposal; and (7) Telecommunications networks. (c) Existing host nation facilities...

  13. 48 CFR 246.270-2 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...— (1) Fire protection; (2) Structural integrity; (3) Electrical systems; (4) Plumbing; (5) Water treatment; (6) Waste disposal; and (7) Telecommunications networks. (c) Existing host nation facilities...

  14. 24 CFR 232.625 - Discrimination prohibited.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Special Requirements § 232.625 Discrimination prohibited. Any contract or...

  15. KSC-2014-3249

    NASA Image and Video Library

    2014-07-21

    CAPE CANAVERAL, Fla. -- Apollo astronauts and their families receive a briefing in one of the remodeled firing rooms in the Launch Control Center at NASA's Kennedy Space Center in Florida. The facility's firing rooms were used to conduct the Saturn V countdowns during the Apollo Program. The tour followed a ceremony renaming the refurbished Operations and Checkout Building for Apollo 11 astronaut Neil Armstrong, the first person to set foot on the moon. Second from left is Apollo 11 moonwalker Buzz Aldrin and former astronaut Jim Lovell, a member of the Apollo 8 and Apollo 13 crews, standing next to him, at center. The ceremony was part of NASA's 45th anniversary celebration of the Apollo 11 moon landing. As the world watched, Neil Armstrong and Buzz Aldrin landed in the moon's Sea of Tranquility on July 20, 1969, aboard the lunar module Eagle. Meanwhile, crewmate Michael Collins orbited above in the command module Columbia. For more, visit http://www.nasa.gov/press/2014/july/nasa-honors-historic-first-moon-landing-eyes-first-mars-mission. Photo credit: NASA/Kim Shiflett

  16. KSC-2014-3248

    NASA Image and Video Library

    2014-07-21

    CAPE CANAVERAL, Fla. -- Apollo astronauts and their families tour one of the remodeled firing rooms in the Launch Control Center at NASA's Kennedy Space Center in Florida. The facility's firing rooms were used to conduct the Saturn V countdowns during the Apollo Program. NASA Administrator Charles Bolden, at left, accompanied the astronauts on the tour which followed a ceremony renaming the refurbished Operations and Checkout Building for Apollo 11 astronaut Neil Armstrong, the first person to set foot on the moon. Former astronaut Jim Lovell, a member of the Apollo 8 and Apollo 13 crews, is at center. The ceremony was part of NASA's 45th anniversary celebration of the Apollo 11 moon landing. As the world watched, Neil Armstrong and Buzz Aldrin landed in the moon's Sea of Tranquility on July 20, 1969, aboard the lunar module Eagle. Meanwhile, crewmate Michael Collins orbited above in the command module Columbia. For more, visit http://www.nasa.gov/press/2014/july/nasa-honors-historic-first-moon-landing-eyes-first-mars-mission. Photo credit: NASA/Kim Shiflett

  17. Weak climatic control of stand-scale fire history during the late holocene.

    PubMed

    Gavin, Daniel G; Hu, Feng Sheng; Lertzman, Kenneth; Corbett, Peter

    2006-07-01

    Forest fire occurrence is affected by multiple controls that operate at local to regional scales. At the spatial scale of forest stands, regional climatic controls may be obscured by local controls (e.g., stochastic ignitions, topography, and fuel loads), but the long-term role of such local controls is poorly understood. We report here stand-scale (<100 ha) fire histories of the past 5000 years based on the analysis of sediment charcoal at two lakes 11 km apart in southeastern British Columbia. The two lakes are today located in similar subalpine forests, and they likely have experienced the same late-Holocene climatic changes because of their close proximity. We evaluated two independent properties of fire history: (1) fire-interval distribution, a measure of the overall incidence of fire, and (2) fire synchroneity, a measure of the co-occurrence of fire (here, assessed at centennial to millennial time scales due to the resolution of sediment records). Fire-interval distributions differed between the sites prior to, but not after, 2500 yr before present. When the entire 5000-yr period is considered, no statistical synchrony between fire-episode dates existed between the two sites at any temporal scale, but for the last 2500 yr marginal levels of synchrony occurred at centennial scales. Each individual fire record exhibited little coherency with regional climate changes. In contrast, variations in the composite record (average of both sites) matched variations in climate evidenced by late-Holocene glacial advances. This was probably due to the increased sample size and spatial extent represented by the composite record (up to 200 ha) plus increased regional climatic variability over the last several millennia, which may have partially overridden local, non-climatic controls. We conclude that (1) over past millennia, neighboring stands with similar modern conditions may have experienced different fire intervals and asynchronous patterns in fire episodes, likely because local controls outweighed the synchronizing effect of climate; (2) the influence of climate on fire occurrence is more strongly expressed when climatic variability is relatively great; and (3) multiple records from a region are essential if climate-fire relations are to be reliably described.

  18. A GIS-based approach for comparative analysis of potential fire risk assessment

    NASA Astrophysics Data System (ADS)

    Sun, Ying; Hu, Lieqiu; Liu, Huiping

    2007-06-01

    Urban fires are one of the most important sources of property loss and human casualty and therefore it is necessary to assess the potential fire risk with consideration of urban community safety. Two evaluation models are proposed, both of which are integrated with GIS. One is the single factor model concerning the accessibility of fire passage and the other is grey clustering approach based on the multifactor system. In the latter model, fourteen factors are introduced and divided into four categories involving security management, evacuation facility, construction resistance and fire fighting capability. A case study on campus of Beijing Normal University is presented to express the potential risk assessment models in details. A comparative analysis of the two models is carried out to validate the accuracy. The results are approximately consistent with each other. Moreover, modeling with GIS promotes the efficiency the potential risk assessment.

  19. Risk factors for acute chemical releases with public health consequences: Hazardous Substances Emergency Events Surveillance in the U.S., 1996–2001

    PubMed Central

    Ruckart, Perri Z; Wattigney, Wendy A; Kaye, Wendy E

    2004-01-01

    Background Releases of hazardous materials can cause substantial morbidity and mortality. To reduce and prevent the public health consequences (victims or evacuations) from uncontrolled or illegally released hazardous substances, a more comprehensive analysis is needed to determine risk factors for hazardous materials incidents. Methods Hazardous Substances Emergency Events Surveillance (HSEES) data from 1996 through 2001 were analyzed using bivariate and multiple logistic regression. Fixed-facility and transportation-related events were analyzed separately. Results For fixed-facility events, 2,327 (8%) resulted in at least one victim and 2,844 (10%) involved ordered evacuations. For transportation-related events, 759 (8%) resulted in at least one victim, and 405 (4%) caused evacuation orders. Fire and/or explosion were the strongest risk factors for events involving either victims or evacuations. Stratified analysis of fixed-facility events involving victims showed a strong association for acid releases in the agriculture, forestry, and fisheries industry. Chlorine releases in fixed-facility events resulted in victims and evacuations in more industry categories than any other substance. Conclusions Outreach efforts should focus on preventing and preparing for fires and explosions, acid releases in the agricultural industry, and chlorine releases in fixed facilities. PMID:15496226

  20. Gravity-Dependent Combustion and Fluids Research - From Drop Towers to Aircraft to the ISS

    NASA Technical Reports Server (NTRS)

    Urban, David L.; Singh, Bhim S.; Kohl, Fred J.

    2007-01-01

    Driven by the need for knowledge related to the low-gravity environment behavior of fluids in liquid fuels management, thermal control systems and fire safety for spacecraft, NASA embarked on a decades long research program to understand, accommodate and utilize the relevant phenomena. Beginning in the 1950s, and continuing through to today, drop towers and aircraft were used to conduct an ever broadening and increasingly sophisticated suite of experiments designed to elucidate the underlying gravity-dependent physics that drive these processes. But the drop towers and aircraft afford only short time periods of continuous low gravity. Some of the earliest rocket test flights and manned space missions hosted longer duration experiments. The relatively longer duration low-g times available on the space shuttle during the 1980s and 1990s enabled many specialized experiments that provided unique data for a wide range of science and engineering disciplines. Indeed, a number of STS-based Spacelab missions were dedicated solely to basic and applied microgravity research in the biological, life and physical sciences. Between 1980 and 2000, NASA implemented a vigorous Microgravity Science Program wherein combustion science and fluid physics were major components. The current era of space stations from the MIR to the International Space Station have opened up a broad range of opportunities and facilities that are now available to support both applied research for technologies that will help to enable the future exploration missions and for a continuation of the non-exploration basic research that began over fifty years ago. The ISS-based facilities of particular value to the fluid physics and combustion/fire safety communities are the Fluids and Combustion Facility Combustion Integrated Rack and the Fluids Integrated Rack.

Top