Sample records for fire test facility

  1. Aviation Engine Test Facilities (AETF) fire protection study

    NASA Astrophysics Data System (ADS)

    Beller, R. C.; Burns, R. E.; Leonard, J. T.

    1989-07-01

    An analysis is presented to the effectiveness of various types of fire fighting agents in extinguishing the kinds of fires anticipated in Aviation Engine Test Facilities (AETF), otherwise known as Hush Houses. The agents considered include Aqueous Film-Forming Foam, Halon 1301, Halon 1211 and water. Previous test work has shown the rapidity with which aircraft, especially high performance aircraft, can be damaged by fire. Based on this, tentative criteria for this evaluation included a maximum time of 20 s from fire detection to extinguishment and a period of 30 min in which the agent would prevent reignition. Other issues examined included: toxicity, corrosivity, ease of personnel egress, system reliability, and cost effectiveness. The agents were evaluated for their performance in several fire scenarios, including: under frame fire, major engine fire, engine disintegration fire, high-volume pool fire with simultaneous spill fire, internal electrical fire, and runaway engine fire.

  2. Fire Fighter Level I-II-III [and] Practical Skills Test. Wisconsin Fire Service Certification Series. Final Revision.

    ERIC Educational Resources Information Center

    Pribyl, Paul F.

    Practical skills tests are provided for fire fighter trainees in the Wisconsin Fire Service Certification Series, Fire Fighter Levels I, II, and III. A course introduction appears first and contains this information: recommended instructional sequence, required facilities, instructional methodology, requirements for certification, course…

  3. Performance of the Spacecraft Propulsion Research Facility During Altitude Firing Tests of the Delta 3 Upper Stage

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Dickens, Kevin W.; Skaff, Tony F.; Cmar, Mark D.; VanMeter, Matthew J.; Haberbusch, Mark S.

    1998-01-01

    The Spacecraft Propulsion Research Facility at the NASA Lewis Research Center's Plum Brook Station was reactivated in order to conduct flight simulation ground tests of the Delta 3 cryogenic upper stage. The tests were a cooperative effort between The Boeing Company, Pratt and Whitney, and NASA. They included demonstration of tanking and detanking of liquid hydrogen, liquid oxygen and helium pressurant gas as well as 12 engine firings simulating first, second, and third burns at altitude conditions. A key to the success of these tests was the performance of the primary facility systems and their interfaces with the vehicle. These systems included the structural support of the vehicle, propellant supplies, data acquisition, facility control systems, and the altitude exhaust system. While the facility connections to the vehicle umbilical panel simulated the performance of the launch pad systems, additional purge and electrical connections were also required which were unique to ground testing of the vehicle. The altitude exhaust system permitted an approximate simulation of the boost-phase pressure profile by rapidly pumping the test chamber from 13 psia to 0.5 psia as well as maintaining altitude conditions during extended steady-state firings. The performance of the steam driven ejector exhaust system has been correlated with variations in cooling water temperature during these tests. This correlation and comparisons to limited data available from Centaur tests conducted in the facility from 1969-1971 provided insight into optimizing the operation of the exhaust system for future tests. Overall, the facility proved to be robust and flexible for vehicle space simulation engine firings and enabled all test objectives to be successfully completed within the planned schedule.

  4. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2002-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility hydrolysis production has been completed to produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material was used atmore » EERC as baseline material and for mixing with the bio-fuel for combustion testing. All the combustion and fuel handling tests at EERC have been completed. During fuel preparation EERC reported no difficulties in fuel blending and handling. Preliminary co-fire test results indicate that the blending of lignin and bio-solids with the Colbert coal blend generally reduces NO{sub x} emissions, increases the reactivity of the coal, and increases the ash deposition rate on superheater surfaces. Deposits produced from the fuel blends, however, are more friable and hence easier to remove from tube surfaces relative to those produced from the baseline Colbert coal blend. The final co-fire testing report is being prepared at EERC and will be completed by the end of the second quarter of 2002. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for the steam supply system was completed. The cost estimate and output and heat rate impacts have been used to determine a preliminary price for the exported steam. TVA is further evaluating the impacts of adding lignin to the coal fuel blend and how the steam cost is impacted by proximity of the Masada biomass facility.« less

  5. Saturn Apollo Program

    NASA Image and Video Library

    1965-01-01

    The Saturn V first stages were test fired at the Mississippi Test Facility and at the Marshall Space Flight Center (MSFC). Five F-1 engines powered the first stage, each developing 1.5 million pounds of thrust. The first stage, known as the S-IC stage, burned over 15 tons of propellant per second during its 2.5 minutes of operation to take the vehicle to a height of about 36 miles and to a speed of about 6,000 miles per hour. The stage was 138 feet long and 33 feet in diameter. This photograph shows the test firing of an F-1 engine at the MSFC's S-IC Static Test Firing Facility.

  6. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-10-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysis production was completed tomore » produce lignin for co-fire testing and the lignin fuel was washed and dewatered. Both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation and co-firing. EERC has received coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio-based fuels is scheduled to begin in October of 2001. The TVA-Colbert facility has neared completion of the task to evaluate co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam.« less

  7. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  8. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant Conceptual Design Engineering Report (CDER)

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the magnetohydrodynamic (MHD) Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD, is summarized. Main elements of the design, systems, and plant facilities are illustrated. System design descriptions are included for closed cycle cooling water, industrial gas systems, fuel oil, boiler flue gas, coal management, seed management, slag management, plant industrial waste, fire service water, oxidant supply, MHD power ventilating

  9. Test results: Halon 1301 versus water sprinkler fire protection for essential electronic equipment

    NASA Astrophysics Data System (ADS)

    Reichelt, E. F.; Walker, J. L.; Vickers, R. N.; Kwan, A. J.

    1982-07-01

    This report describes results of testing two contending extinguishants, Halon 1301 and water, for fire protection of essential electronic equipment. A series of controlled fires in a facility housing an operational electronic data processing system sought to establish immediate and long term effects of exposure of sensitive electronic equipment and stored data to fire extinguishment atmospheres. Test results lead to the conclusion that Halon 1301 is superior to water as an extinguishant for fires occurring in essential electronic equipment installations.

  10. High Pressure Industrial Water Facility

    NASA Technical Reports Server (NTRS)

    1992-01-01

    In conjunction with Space Shuttle Main Engine testing at Stennis, the Nordberg Water Pumps at the High Pressure Industrial Water Facility provide water for cooling the flame deflectors at the test stands during test firings.

  11. Development of fire test methods for airplane interior materials

    NASA Technical Reports Server (NTRS)

    Tustin, E. A.

    1978-01-01

    Fire tests were conducted in a 737 airplane fuselage at NASA-JSC to characterize jet fuel fires in open steel pans (simulating post-crash fire sources and a ruptured airplane fuselage) and to characterize fires in some common combustibles (simulating in-flight fire sources). Design post-crash and in-flight fire source selections were based on these data. Large panels of airplane interior materials were exposed to closely-controlled large scale heating simulations of the two design fire sources in a Boeing fire test facility utilizing a surplused 707 fuselage section. Small samples of the same airplane materials were tested by several laboratory fire test methods. Large scale and laboratory scale data were examined for correlative factors. Published data for dangerous hazard levels in a fire environment were used as the basis for developing a method to select the most desirable material where trade-offs in heat, smoke and gaseous toxicant evolution must be considered.

  12. Facilities and Methods Used in Full-scale Airplane Crash-fire Investigation

    NASA Technical Reports Server (NTRS)

    Black, Dugald O.

    1952-01-01

    The facilities and the techniques employed in the conduct of full scale airplane crash-fire studies currently being conducted at the NACA Lewis laboratory are discussed herein. This investigation is part of a comprehensive study of the airplane crash-fire problem. The crash configuration chosen, the general physical layout of the crash site, the test methods, the instrumentation, the data-recording systems, and the post-crash examination procedure are described

  13. Hot-Fire Testing of 5N and 22N HPGP Thrusters

    NASA Technical Reports Server (NTRS)

    Burnside, Christopher G.; Pedersen, Kevin W.; Pierce, Charles W.

    2015-01-01

    This hot-fire test continues NASA investigation of green propellant technologies for future missions. To show the potential for green propellants to replace some hydrazine systems in future spacecraft, NASA Marshall Space Flight Center (MSFC) is continuing to embark on hot-fire test campaigns with various green propellant blends.NASA completed hot-fire testing of 5N and 22N HPGP thrusters at the Marshall Space Flight Center’s Component Development Area altitude test stand in April 2015. Both thrusters are ground test articles and not flight ready units, but are representative of potential flight hardware with a known path towards flight application. The purpose of the 5N testing was to perform facility check-outs and generate a small set of data for comparison to ECAPS and Orbital ATK data sets. The 5N thruster performed as expected with thrust and propellant flow-rate data generated that are similar to previous testing at Orbital ATK. Immediately following the 5N testing, and using the same facility, the 22N testing was conducted on the same test stand with the purpose of demonstrating the 22N performance. The results of 22N testing indicate it performed as expected.The results of the hot-fire testing are presented in this paper and presentation.

  14. Vulnerability Methodology and Protective Measures for Aircraft Fire and Explosion Hazards. Volume 2. Aircraft Engine Nacelle Fire Test Programs. Part 1. Fire Detection, Fire Extinguishment and Surface Ignition Studies

    DTIC Science & Technology

    1986-01-01

    by sensors in the test cell and sampled, digitized, averaged, and calibrated by the facility computer system. The data included flowrates calculated ...before the next test could be started. This required about 2 minutes. 6.4 Combat Damage Testing Appendix C contains calculations and analysis...were comparable (Figure 7-5). Agent quantities required per MIL-E-22285 were again calculated using the equations noted in paragraph 7.1.1. The

  15. Saturn Apollo Program

    NASA Image and Video Library

    1967-08-01

    This photograph is a view of the Saturn V S-IC-5 (first) flight stage static test firing at the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. Begirning operations in 1966, the MTF has two test stands, a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 407-foot-high test stand for the static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988.

  16. Facility Activation and Characterization for IPD Workhorse Preburner and Oxidizer Turbopump Hot-Fire Testing at NASA Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Sass, J. P.; Raines, N. G.; Ryan, H. M.

    2004-01-01

    The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is part of NASA's Next Generation Launch Technology (NGLT) program, which seeks to provide safe, dependable, cost-cutting technologies for future space launch systems. The project also is part of the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today s state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The intended full flow engine cycle is a key component in achieving all of the aforementioned goals. The IPD Program recently achieved a major milestone with the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in late 2004. Following an overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD Workhorse Preburner and the IPD Oxidizer Turbopump. In addition, some of the facility challenges encountered during the test project shall be addressed.

  17. Oxygen Assessments Ensure Safer Medical Devices

    NASA Technical Reports Server (NTRS)

    2013-01-01

    A team at White Sands Test Facility developed a test method to evaluate fire hazards in oxygen-enriched environments. Wendell Hull and Associates, located in Las Cruces, New Mexico, entered a Space Act Agreement with NASA and now provides services including fire and explosion investigations, oxygen testing and training, and accident reconstruction and forensic engineering.

  18. A3 Subscale Rocket Hot Fire Testing

    NASA Technical Reports Server (NTRS)

    Saunders, G. P.; Yen, J.

    2009-01-01

    This paper gives a description of the methodology and results of J2-X Subscale Simulator (JSS) hot fire testing supporting the A3 Subscale Diffuser Test (SDT) project at the E3 test facility at Stennis Space Center, MS (SSC). The A3 subscale diffuser is a geometrically accurate scale model of the A3 altitude simulating rocket test facility. This paper focuses on the methods used to operate the facility and obtain the data to support the aerodynamic verification of the A3 rocket diffuser design and experimental data quantifying the heat flux throughout the facility. The JSS was operated at both 80% and 100% power levels and at gimbal angle from 0 to 7 degrees to verify the simulated altitude produced by the rocket-rocket diffuser combination. This was done with various secondary GN purge loads to quantify the pumping performance of the rocket diffuser. Also, special tests were conducted to obtain detailed heat flux measurements in the rocket diffuser at various gimbal angles and in the facility elbow where the flow turns from vertical to horizontal upstream of the 2nd stage steam ejector.

  19. Cold Regions Test of Indirect Fire Weapons Ammunition

    DTIC Science & Technology

    1983-03-08

    COLD REGIONS TEST OF INDIRECT FIRE WEAPONS AMMUNITION Paragraph 1 . SCOPE. 1 2. FACILITIES AND INSTRUMENTATION .......... 3. PREPARATION FOR TEST...A- 1 B. Data Collection Sheets ..... .............. B- 1 C. References ..... .................... ... C- 1 D. Cold-Dry...Uniform .D...... .. ... .. ... 0- 1 1 . SCOPE. The procedures outlined in this TOP are designed to determine the c-h-arac-teristics of indirect artillery

  20. Space Launch System Booster Passes Major Ground Test

    NASA Image and Video Library

    2015-03-11

    The largest, most powerful rocket booster ever built successfully fired up Wednesday for a major-milestone ground test in preparation for future missions to help propel NASA’s Space Launch System (SLS) rocket and Orion spacecraft to deep space destinations, including an asteroid and Mars. The booster fired for two minutes, the same amount of time it will fire when it lifts the SLS off the launch pad, and produced about 3.6 million pounds of thrust. The test was conducted at the Promontory, Utah test facility of commercial partner Orbital ATK.

  1. Fire protection for launch facilities using machine vision fire detection

    NASA Astrophysics Data System (ADS)

    Schwartz, Douglas B.

    1993-02-01

    Fire protection of critical space assets, including launch and fueling facilities and manned flight hardware, demands automatic sensors for continuous monitoring, and in certain high-threat areas, fast-reacting automatic suppression systems. Perhaps the most essential characteristic for these fire detection and suppression systems is high reliability; in other words, fire detectors should alarm only on actual fires and not be falsely activated by extraneous sources. Existing types of fire detectors have been greatly improved in the past decade; however, fundamental limitations of their method of operation leaves open a significant possibility of false alarms and restricts their usefulness. At the Civil Engineering Laboratory at Tyndall Air Force Base in Florida, a new type of fire detector is under development which 'sees' a fire visually, like a human being, and makes a reliable decision based on known visual characteristics of flames. Hardware prototypes of the Machine Vision (MV) Fire Detection System have undergone live fire tests and demonstrated extremely high accuracy in discriminating actual fires from false alarm sources. In fact, this technology promises to virtually eliminate false activations. This detector could be used to monitor fueling facilities, launch towers, clean rooms, and other high-value and high-risk areas. Applications can extend to space station and in-flight shuttle operations as well; fiber optics and remote camera heads enable the system to see around obstructed areas and crew compartments. The capability of the technology to distinguish fires means that fire detection can be provided even during maintenance operations, such as welding.

  2. Fire protection for launch facilities using machine vision fire detection

    NASA Technical Reports Server (NTRS)

    Schwartz, Douglas B.

    1993-01-01

    Fire protection of critical space assets, including launch and fueling facilities and manned flight hardware, demands automatic sensors for continuous monitoring, and in certain high-threat areas, fast-reacting automatic suppression systems. Perhaps the most essential characteristic for these fire detection and suppression systems is high reliability; in other words, fire detectors should alarm only on actual fires and not be falsely activated by extraneous sources. Existing types of fire detectors have been greatly improved in the past decade; however, fundamental limitations of their method of operation leaves open a significant possibility of false alarms and restricts their usefulness. At the Civil Engineering Laboratory at Tyndall Air Force Base in Florida, a new type of fire detector is under development which 'sees' a fire visually, like a human being, and makes a reliable decision based on known visual characteristics of flames. Hardware prototypes of the Machine Vision (MV) Fire Detection System have undergone live fire tests and demonstrated extremely high accuracy in discriminating actual fires from false alarm sources. In fact, this technology promises to virtually eliminate false activations. This detector could be used to monitor fueling facilities, launch towers, clean rooms, and other high-value and high-risk areas. Applications can extend to space station and in-flight shuttle operations as well; fiber optics and remote camera heads enable the system to see around obstructed areas and crew compartments. The capability of the technology to distinguish fires means that fire detection can be provided even during maintenance operations, such as welding.

  3. 30 CFR 75.1903 - Underground diesel fuel storage facilities and areas; construction and safety precautions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing... (ABC) fire extinguishers that are listed or approved by a nationally recognized independent testing... storage; and (4) Maintained to prevent the accumulation of water. (c) Welding or cutting other than that...

  4. Spacecraft fire-safety experiments for space station: Technology development mission

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.

    1988-01-01

    Three concept designs for low-gravity, fire-safety related experiments are presented, as selected for the purpose of addressing key issues of enhancing safety and yet encouraging access to long-duration, manned spacecraft such as the NASA space station. The selected low-gravity experiments are the following: (1) an investigation of the flame-spread rate and combustion-product evolution of the burning of typical thicknesses of spacecraft materials in very low-speed flows; (2) an evaluation of the interaction of fires and candidate extinguishers in various fire scenarios; and (3) an investigation of the persistence and propagation of smoldering and deep-seated combustion. Each experiment is expected to provide fundamental combustion-science data, as well as the fire-safety applications, and each requires the unique long-duration, low-gravity environment of the space station. Two generic test facilities, i.e., the Combustion Tunnel Facility and the Combustion Facility, are proposed for space station accommodation to support the selected experiments. In addition, three near-term, fire-safety related experiments are described along with other related precursor activities.

  5. THE CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-07-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates were completed and issued. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. During this first quarter of 2001, shredding of the feed material and final feed conditioning were completed. Pilot facility hydrolysismore » production was completed to produce lignin for co-fire testing. During this quarter, TVA completed the washing and dewatering of the lignin material produced from the MSW hydrolysis. Seven drums of lignin material were washed to recover the acid and sugar from the lignin and provide an improved fuel for steam generation. Samples of both the lignin and bio-solids fuel materials for co-fire testing were sent to the co-fire facility (EERC) for evaluation. After sample evaluation, EERC approved sending the material and all of the necessary fuel for testing was shipped to EERC. EERC has requested and will receive coal typical of the fuel to the TVA-Colbert boilers. This material will be used at EERC as baseline material and for mixing with the bio-fuel for combustion testing. EERC combustion testing of the bio based fuels is scheduled to begin in August of 2001. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system was completed. The cost estimate and the output and heat rate impacts will be used to determine a preliminary price for the exported steam. The preliminary steam price will be determined in the next quarter.« less

  6. Liquid hydrogen turbopump ALS advanced development program. Volume 1: Hot fire unit

    NASA Technical Reports Server (NTRS)

    Lindley, Bruce

    1990-01-01

    The interface criteria for the Turbopump Test article (TPA) and the Component Test Facility located at NASA, Stennis Space Center is defined by this interface Control Document (ICD). TPA ICD Volume 2 is submitted for the Cold Gas Drive Turbopump Test Article, which is generally similar but incorporates certain changes, particularly in fluid requirements and in instrumentation needs. For the purposes of this ICD, the test article consists of the Hot Fire Drive Turbopump mounted on its test cart, readied for installation in the component test facility. It should be emphasized that the LH2 turbopump program is still in its early concept design phase. Design of the turbopump, test cart, and spools are subject to revisions until successful conclusion of the Detail Design Review (DDR).

  7. Verification study of an emerging fire suppression system

    DOE PAGES

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.; ...

    2016-01-01

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation andmore » mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.« less

  8. Verification study of an emerging fire suppression system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cournoyer, Michael E.; Waked, R. Ryan; Granzow, Howard N.

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Moreover, plutonium gloveboxes present harsh environmental conditions for polymer materials; these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. Several studies have been conducted to determine the robustness of selfcontained fire extinguishers in plutonium gloveboxes in a nuclear facility, verification tests must be performed. These tests include activation and mass loss calorimeter tests. In addition, compatibility issues with chemical components of the self-contained fire extinguishers need to be addressed. Our study presents activation andmore » mass loss calorimeter test results. After extensive studies, no critical areas of concern have been identified for the plutonium glovebox application of Fire Foe™, except for glovebox operations that use large quantities of bulk plutonium or uranium metal such as metal casting and pyro-chemistry operations.« less

  9. 78 FR 78467 - Office of Commercial Space Transportation; Notice of Intent to Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... persons regarding the FAA's intent to prepare an EIS that will evaluate the potential environmental... launches per year (12 launches per vertical launch facility), as well as up to 24 static fire engine tests or wet dress rehearsals per year (12 static fire engine tests or wet dress rehearsals per vertical...

  10. Removal of Perfluorooctanoic Acid from Water Using Primitive, Conventional and Novel Carbonaceous Sorbent Materials

    DTIC Science & Technology

    Polyfluoroalkyl Substances ( PFAS ), like perfluorooctanoic acid, have been used for the last 50 years in a wide variety of industrial processes and...The Department of Defense (DoD) has used PFAS -based Aqueous Film Forming Foam (AFFF) at fire training facilities and aircraft hangars. These AFFFs have...contaminated approximately 600 sites classified as fire training facilities with PFAS (Huang, 2013). This study focused on testing the most likely

  11. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-04-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter of 2000. Initial pilot facility shakedown was completed during the fourth quarter. After some unavoidable delays, a suitable representative supply of municipal solid waste (MSW) feed material was procured. During this quarter (first quarter of 2001), shredding of the feed material was completedmore » and final feed conditioning was completed. Pilot facility hydrolysis production was completed to produce lignin for co-fire testing. Pilot facility modifications continued to improve facility operations and performance during the first quarter of 2001. Samples of the co-fire fuel material were sent to the co-fire facility for evaluation. The TVA-Colbert facility has neared completion of the task to evaluate the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system have been completed and a cost estimate for steam supply system is being developed.« less

  12. Remote monitoring of a Fire Protection System

    NASA Astrophysics Data System (ADS)

    Bauman, Steven; Vermeulen, Tom; Roberts, Larry; Matsushige, Grant; Gajadhar, Sarah; Taroma, Ralph; Elizares, Casey; Arruda, Tyson; Potter, Sharon; Hoffman, James

    2011-03-01

    Some years ago CFHT proposed developing a Remote Observing Environment aimed at producing Science Observations at their Observatory Facility on Mauna Kea from their Headquarters facility in Waimea, HI. This Remote Observing Project commonly referred to as OAP (Observatory Automation Project) was completed at the end of January 2011 and has been providing the majority of Science Data since. My poster will discuss the upgrades to the existing fire alarm protection system. With no one at the summit during nightly operations, the observatory facility required automated monitoring of the facility for safety to personnel and equipment in the case of a fire. An addressable analog fire panel was installed which utilizes digital communication protocol (DCP), intelligent communication with other devices, and an RS-232 interface which provides feedback and real-time monitoring of the system. Using the interface capabilities of the panel, it provides notifications when heat detectors, smoke sensors, manual pull stations, or the main observatory computer room fire suppression system has been activated. The notifications are sent out as alerts to staff in the form of test massages and emails and the observing control GUI interface alerts the remote telescope operator with a map showing the location of the fire occurrence and type of device that has been triggered. And all of this was accomplished without the need for an outside vendor to monitor the system and facilitate warnings or notifications regarding the system.

  13. Facility Activation and Characterization for IPD Turbopump Testing at NASA Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Sass, J. P.; Pace, J. S.; Raines, N. G.; Meredith, T. O.; Taylor, S. A.; Ryan, H. M.

    2005-01-01

    The Integrated Powerhead Demonstrator (IPD) is a 250K lbf (1.1 MN) thrust cryogenic hydrogen/oxygen engine technology demonstrator that utilizes a full flow staged combustion engine cycle. The Integrated Powerhead Demonstrator (IPD) is, in part, supported by NASA. IPD is also supported through the Department of Defense's Integrated High Payoff Rocket Propulsion Technology (IHPRPT) program, which seeks to increase the performance and capability of today's state-of-the-art rocket propulsion systems while decreasing costs associated with military and commercial access to space. The primary industry participants include Boeing-Rocketdyne and GenCorp Aerojet. The IPD Program recently achieved two major milestones. The first was the successful completion of the IPD Oxidizer Turbopump (OTP) hot-fire test project at the NASA John C. Stennis Space Center (SSC) E-1 test facility in June 2003. A total of nine IPD Workhorse Preburner tests were completed, and subsequently 12 IPD OTP hot-fire tests were completed. The second major milestone was the successful completion of the IPD Fuel Turbopump (FTP) cold-flow test project at the NASA SSC E-1 test facility in November 2003. A total of six IPD FTP cold-flow tests were completed. The next phase of development involves IPD integrated engine system testing also at the NASA SSC E-1 test facility scheduled to begin in early 2005. Following and overview of the NASA SSC E-1 test facility, this paper addresses the facility aspects pertaining to the activation and testing of the IPD oxidizer and fuel turbopumps. In addition, some of the facility challenges encountered and the lessons learned during the test projects shall be detailed.

  14. Impacts: NIST Building and Fire Research Laboratory (technical and societal)

    NASA Astrophysics Data System (ADS)

    Raufaste, N. J.

    1993-08-01

    The Building and Fire Research Laboratory (BFRL) of the National Institute of Standards and Technology (NIST) is dedicated to the life cycle quality of constructed facilities. The report describes major effects of BFRL's program on building and fire research. Contents of the document include: structural reliability; nondestructive testing of concrete; structural failure investigations; seismic design and construction standards; rehabilitation codes and standards; alternative refrigerants research; HVAC simulation models; thermal insulation; residential equipment energy efficiency; residential plumbing standards; computer image evaluation of building materials; corrosion-protection for reinforcing steel; prediction of the service lives of building materials; quality of construction materials laboratory testing; roofing standards; simulating fires with computers; fire safety evaluation system; fire investigations; soot formation and evolution; cone calorimeter development; smoke detector standards; standard for the flammability of children's sleepwear; smoldering insulation fires; wood heating safety research; in-place testing of concrete; communication protocols for building automation and control systems; computer simulation of the properties of concrete and other porous materials; cigarette-induced furniture fires; carbon monoxide formation in enclosure fires; halon alternative fire extinguishing agents; turbulent mixing research; materials fire research; furniture flammability testing; standard for the cigarette ignition resistance of mattresses; support of navy firefighter trainer program; and using fire to clean up oil spills.

  15. 1. Photographic copy of fire alarm plan for Control and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of fire alarm plan for Control and Recording Center Building 4221/E-22, showing layout of rooms. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering 'Edwards Test Station, Fire Alarm Plan, Bldg. E-22,' drawing no. EFA/11-1, December 15, 1961. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  16. Laboratory test methods for evaluating the fire response of aerospace materials

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.

    1979-01-01

    The test methods which were developed or evaluated were intended to serve as means of comparing materials on the basis of specific responses under specific sets of test conditions, using apparatus, facilities, and personnel that would be within the capabilities of perhaps the majority of laboratories. Priority was given to test methods which showed promise of addressing the pre-ignition state of a potential fire. These test methods were intended to indicate which materials may present more hazard than others under specific test conditions. These test methods are discussed and arranged according to the stage of a fire to which they are most relevant. Some observations of material performance which resulted from this work are also discussed.

  17. Identifying Indicators of State Change and Forecasting Future Vulnerability in Alaskan Boreal Ecosystems

    DTIC Science & Technology

    2016-08-01

    ice have catastrophic effects on facilities, infrastructure, and military testing and training. Permafrost temperature , thickness, and geographic...treeline) and fire severity (~0 to ~100% SOL consumption ), they provide an excellent suite of sites to test and quantify the effects of fire severity...stages .........................59 Table 6.1. Variables included in explanatory matrix for black spruce dominance ............68 Table 6.2. Mixed effect

  18. Identifying Indicators of State Change and Forecasting Future Vulnerability in Alaskan Boreal Ecosystems

    DTIC Science & Technology

    2016-08-01

    catastrophic effects on facilities, infrastructure, and military testing and training. Permafrost temperature , thickness, and geographic continuity...and fire severity (~0 to ~100% SOL consumption ), they provide an excellent suite of sites to test and quantify the effects of fire severity on plant...59 Table 6.1. Variables included in explanatory matrix for black spruce dominance ............68 Table 6.2. Mixed effect model

  19. A User's Guide for the Spacecraft Fire Safety Facility

    NASA Technical Reports Server (NTRS)

    Goldmeer, Jeffrey S.

    2000-01-01

    The Spacecraft Fire Safety Facility (SFSF) is a test facility that can be flown on NASA's reduced gravity aircraft to perform various types of combustion experiments under a variety of experimental conditions. To date, this facility has flown numerous times on the aircraft and has been used to perform experiments ranging from an examination of the effects transient depressurization on combustion, to ignition and flame spread. A list of pubfications/presentations based on experiments performed in the SFSF is included in the reference section. This facility consists of five main subsystems: combustion chamber, sample holders, gas flow system, imaging system, and the data acquisition/control system. Each of these subsystems will be reviewed in more detail. These subsystems provide the experiment operator with the ability to monitor and/or control numerous experimental parameters.

  20. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    This photograph is a view of the Saturn V S-IC (first) test stage being hoisted into the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. This stage was used to prove the operational readiness of the stand. Begirning operations in 1966, the MTF has two test stands; a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from the Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 124-meter-high test stand for static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988.

  1. Historic tests

    NASA Image and Video Library

    2012-08-16

    Two large-engine tests were conducted simultaneously for the first time at Stennis Space Center on Aug. 16. A plume on the left indicates a test on the facility's E-1 Test Stand. On the right, a finger of fire indicates a test under way on the A-1 Test Stand. In another first, both tests were conducted by female engineers. The image was taken from atop the facility's A-2 Test Stand, offering a panoramic view that includes the new A-3 Test Stand under construction to the left.

  2. Centaur Rocket in Space Propulsion Research Facility (B-2)

    NASA Image and Video Library

    1969-07-21

    A Centaur second-stage rocket in the Space Propulsion Research Facility, better known as B‒2, operating at NASA’s Plum Brook Station in Sandusky, Ohio. Centaur was designed to be used with an Atlas booster to send the Surveyor spacecraft to the moon in the mid-1960s. After those missions, the rocket was modified to launch a series of astronomical observation satellites into orbit and send space probes to other planets. Researchers conducted a series of systems tests at the Plum Brook test stands to improve the Centaur fuel pumping system. Follow up full-scale tests in the B-2 facility led to the eventual removal of the boost pumps from the design. This reduced the system’s complexity and significantly reduced the cost of a Centaur rocket. The Centaur tests were the first use of the new B-2 facility. B‒2 was the world's only high altitude test facility capable of full-scale rocket engine and launch vehicle system level tests. It was created to test rocket propulsion systems with up to 100,000 pounds of thrust in a simulated space environment. The facility has the unique ability to maintain a vacuum at the rocket’s nozzle while the engine is firing. The rocket fires into a 120-foot deep spray chamber which cools the exhaust before it is ejected outside the facility. B‒2 simulated space using giant diffusion pumps to reduce chamber pressure 10-6 torr, nitrogen-filled cold walls create cryogenic temperatures, and quartz lamps replicate the radiation of the sun.

  3. Conceptual design of the MHD Engineering Test Facility

    NASA Technical Reports Server (NTRS)

    Bents, D. J.; Bercaw, R. W.; Burkhart, J. A.; Mroz, T. S.; Rigo, H. S.; Pearson, C. V.; Warinner, D. K.; Hatch, A. M.; Borden, M.; Giza, D. A.

    1981-01-01

    The reference conceptual design of the MHD engineering test facility, a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commerical feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates are included and the engineering issues that should be reexamined are identified.

  4. Use of automatic door closers improves fire safety.

    PubMed

    Waterman, T E

    1979-01-01

    In a series of 16 full-scale fire tests, investigators at the IIT Research Institute have concluded that automatic door control in the room of fire origin can significantly reduce the spread of toxic smoke and gases. The researchers also investigated the effects of sprinkler actuation, and the functional relationship between sprinklers and automatic door closers. This report presents the results of the study, and presents recommendations for health-care facilities.

  5. B-1 and B-3 Test Stands at NASA’s Plum Brook Station

    NASA Image and Video Library

    1966-09-21

    Operation of the High Energy Rocket Engine Research Facility (B-1), left, and Nuclear Rocket Dynamics and Control Facility (B-3) at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station in Sandusky, Ohio. The test stands were constructed in the early 1960s to test full-scale liquid hydrogen fuel systems in simulated altitude conditions. Over the next decade each stand was used for two major series of liquid hydrogen rocket tests: the Nuclear Engine for Rocket Vehicle Application (NERVA) and the Centaur second-stage rocket program. The different components of these rocket engines could be studied under flight conditions and adjusted without having to fire the engine. Once the preliminary studies were complete, the entire engine could be fired in larger facilities. The test stands were vertical towers with cryogenic fuel and steam ejector systems. B-1 was 135 feet tall, and B-3 was 210 feet tall. Each test stand had several levels, a test section, and ground floor shop areas. The test stands relied on an array of support buildings to conduct their tests, including a control building, steam exhaust system, and fuel storage and pumping facilities. A large steam-powered altitude exhaust system reduced the pressure at the exhaust nozzle exit of each test stand. This allowed B-1 and B-3 to test turbopump performance in conditions that matched the altitudes of space.

  6. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    This photograph is a view of the Saturn V S-IC-5 (first) flight stage being hoisted into the S-IC-B1 test stand at the Mississippi Test Facility (MTF), Bay St. Louis, Mississippi. Begirning operations in 1966, the MTF has two test stands, a dual-position structure for running the S-IC stage at full throttle, and two separate stands for the S-II (Saturn V third) stage. It became the focus of the static test firing program. The completed S-IC stage was shipped from Michoud Assembly Facility (MAF) to the MTF. The stage was then installed into the 124-meter-high test stand for static firing tests before shipment to the Kennedy Space Center for final assembly of the Saturn V vehicle. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Stennis Space Center (SSC) in May 1988.

  7. Fire Safety in Nursing Facilities: Participant's Coursebook.

    ERIC Educational Resources Information Center

    Walker (Bonnie) and Associates, Inc., Crofton, MD.

    Fewer people die in nursing facility fires than in fires occurring in other places where older people live. Fire remains, however, a significant threat in nursing facilities. This book is centered around six "modules" that present a fire safety training program for managers and staff in nursing homes. These modules present the following…

  8. Testing of Fire Fighting Foam.

    DTIC Science & Technology

    1980-11-01

    for Fresh and Sea Water ( MIL - F - 24385 ); -(C) Underwriters Laboratories Inc. S andard for Air Foam Equipment and Liquid Con- centrates (UL162);4D...C. Test Facilities 6 D. Test Procedures 7 III. Results of Tests A. FRN-1007 33 B. MIL - F - 24385 34 C. UL 162 34 D. O- F -555C 35 E. Foam Quality 35 IV...1 gpm) H N-heptane in. inch (25.4 mm = 1 in.) ipm liters per minute M Motor Octane Rating MIL MIL - F - 24385 Test Method NFPA National Fire Protection

  9. Acoustic Emission Test for Aircraft Halon 1301 Fire Extinguisher Bottles

    DOT National Transportation Integrated Search

    1998-04-01

    An acoustic emission test for aircraft Halon 1301 bottles has been developed, a prototype acoustic emission test system constructed, and over 200 used bottles tested at the repair facilities of the two manufacturers of these bottles. The system monit...

  10. Morpheus Lander Testing Campaign

    NASA Technical Reports Server (NTRS)

    Hart, Jeremy J.; Mitchell, Jennifer D.

    2011-01-01

    NASA s Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing designed to serve as a testbed for advanced spacecraft technologies. The Morpheus vehicle has successfully performed a set of integrated vehicle test flights including hot-fire and tether tests, ultimately culminating in an un-tethered "free-flight" This development and testing campaign was conducted on-site at the Johnson Space Center (JSC), less than one year after project start. Designed, developed, manufactured and operated in-house by engineers at JSC, the Morpheus Project represents an unprecedented departure from recent NASA programs and projects that traditionally require longer development lifecycles and testing at remote, dedicated testing facilities. This paper documents the integrated testing campaign, including descriptions of test types (hot-fire, tether, and free-flight), test objectives, and the infrastructure of JSC testing facilities. A major focus of the paper will be the fast pace of the project, rapid prototyping, frequent testing, and lessons learned from this departure from the traditional engineering development process at NASA s Johnson Space Center.

  11. Fire-protection research for energy technology: Fy 80 year end report

    NASA Astrophysics Data System (ADS)

    Hasegawa, H. K.; Alvares, N. J.; Lipska, A. E.; Ford, H.; Priante, S.; Beason, D. G.

    1981-05-01

    This continuing research program was initiated in order to advance fire protection strategies for Fusion Energy Experiments (FEE). The program expanded to encompass other forms of energy research. Accomplishments for fiscal year 1980 were: finalization of the fault-free analysis of the Shiva fire management system; development of a second-generation, fire-growth analysis using an alternate model and new LLNL combustion dynamics data; improvements of techniques for chemical smoke aerosol analysis; development and test of a simple method to assess the corrosive potential of smoke aerosols; development of an initial aerosol dilution system; completion of primary small-scale tests for measurements of the dynamics of cable fires; finalization of primary survey format for non-LLNL energy technology facilities; and studies of fire dynamics and aerosol production from electrical insulation and computer tape cassettes.

  12. The White Sands Test Facility

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This is an overview of the White Sands Test Facility's role in ensuring the safety and reliability of materials and hardware slated for launch aboard the Space Shuttle. Engine firings, orbital flights debris impact tests, and propulsion tests are featured as well as illustrating how they provide flight safety testing for the Johnson Space Center, other NASA centers, and various government agencies. It also contains a historical perspective and highlights of major programs that have been participated in as part of NASA.

  13. Fire Hazard Assessment in Supporting Fire Protection System Design of a Chemical Process Facility

    DTIC Science & Technology

    1996-08-01

    CSDP/Studies/FireHaz –i– 3/28/97 FIRE HAZARD ASSESSMENT IN SUPPORTING FIRE PROTECTION SYSTEM DESIGN OF A CHEMICAL PROCESS FACILITY Ali Pezeshk...Joseph Chang, Dwight Hunt, and Peter Jahn Parsons Infrastructure & Technology Group, Inc. Pasadena, California 91124 ABSTRACT Because fires in a chemical ...Assessment in Supporting Fire Protection System Design of a Chemical Process Facility 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6

  14. Major International R and D Ranges and Test Facilities. Summary of Capabilities

    DTIC Science & Technology

    1990-01-01

    with a maximum impulse of firing of large numbers of rounds by a weapon in order to 1500 G and a maximum test item weight of 200 pounds. produce...millimetres may be fired safely, using test item weight of 1,000 pounds. training practice or training practice tracer ammunition. The :ange butts consist of...predictions of coherent sound propagation loss in the ocean. This information is useful in estimating the performance of low-frequency passive sonars

  15. Fire safety of ground-based space facilities on the spaceport ;Vostochny;

    NASA Astrophysics Data System (ADS)

    Artamonov, Vladimir S.; Gordienko, Denis M.; Melikhov, Anatoly S.

    2017-06-01

    The facilities of the spaceport ;Vostochny; and the innovative technologies for fire safety to be implemented are considered. The planned approaches and prospects for fire safety ensuring at the facilities of the spaceport ;Vostochny; are presented herein, based on the study of emergency situations having resulted in fire accidents and explosion cases at the facilities supporting space vehicles operation.

  16. KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  17. Spacecraft propulsion systems test capability at the NASA White Sands Test Facility

    NASA Technical Reports Server (NTRS)

    Baker, Pleddie; Gorham, Richard

    1993-01-01

    The NASA White Sands Facility (WSTF), a component insallation of the Johnson Space Center, is located on a 94-square-mile site in southwestern New Mexico. WSTF maintains many unique capabilities to support its mission to test and evaluate spacecraft materials, components, and propulsion systems to enable the safe human exploration and utilization of space. WSTF has tested over 340 rocket engines with more than 2.5 million firings to date. Included are propulsion system testing for Apollo, Shuttle, and now Space Station as well as unmanned spacecraft such as Viking, Pioneer, and Mars Observer. This paper describes the current WSTF propulsion test facilities and capabilities.

  18. CONCEPTUAL DESIGN ASSESSMENT FOR THE CO-FIRING OF BIO-REFINERY SUPPLIED LIGNIN PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ted Berglund; Jeffrey T. Ranney; Carol L. Babb

    2001-01-01

    The major aspects of this project are proceeding toward completion. Prior to this quarter, design criteria, tentative site selection, facility layout, and preliminary facility cost estimates have been completed and issued for review. Processing of bio-solids was completed, providing material for the pilot operations. Pilot facility design, equipment selection, and modification were completed during the fourth quarter. Initial pilot facility shakedown was completed during the fourth quarter. During pilot plant shakedown operations, several production batch test runs were performed. These pilot tests were coupled with laboratory testing to confirm pilot results. In initial batches of operations, cellulose to glucose conversionsmore » of 62.5% and 64.8% were observed in laboratory hydrolysis. As part of this testing, lignin dewatering was tested using laboratory and vendor-supplied filtration equipment. Dewatering tests reported moisture contents in the lignin of between 50% and 60%. Dewatering parameters and options will continue to be investigated during lignin production. After some unavoidable delays, a suitable representative supply of MSW feed material was procured. Shredding of the feed material was completed and final drying of the feed is expected to be completed by late January. Once feed drying is completed, pilot facility production will begin to produce lignin for co-fire testing. Facility modifications are expected to continue to improve facility operations and performance during the first quarter of 2001. The TVA-Colbert facility continues to make progress in evaluating the co-location of the Masada facility on the operation of the power generation facility. The TVA-Colbert fossil plant is fully capable of providing a reliable steam supply. The preferred steam supply connection points and steam pipeline routing have been identified. The environmental review of the pipeline routing has been completed and no major impacts have been identified. Detailed assessment of steam export impacts on the Colbert boiler system continues.« less

  19. Evaluating the Emergency Notification Systems of the NASA White Sands Test

    NASA Technical Reports Server (NTRS)

    Chavez, Alfred Paul

    2004-01-01

    The problem was that the NASA Fire and Emergency Services did not know if the current emergency notification systems on the NASA White Sands Test Facility were appropriate for alerting the employees of an emergency. The purpose of this Applied Research Project was to determine if the current emergency notification systems of the White Sands Test Facility are appropriate for alerting the employees of an emergency. This was a descriptive research project. The research questions were: 1) What are similar facilities using to alert the employees of an emergency?; 2) Are the current emergency notification systems suitable for the community hazards on the NASA White Sands Test Facility?; 3) What is the NASA Fire and Emergency Services currently using to measure the effectiveness of the emergency notification systems?; and 4) What are the current training methods used to train personnel to the emergency notification systems at the NASA White Sands Test Facility? The procedures involved were to research other established facilities, research published material from credible sources, survey the facility to determine the facility perception of the emergency notification systems, and evaluate the operating elements of the established emergency notification systems for the facility. The results were that the current systems are suitable for the type of hazards the facility may endure. The emergency notification systems are tested frequently to ensure effectiveness in the event of an emergency. Personnel are trained and participate in a yearly drill to make certain personnel are educated on the established systems. The recommendations based on the results were to operationally improve the existing systems by developing and implementing one system that can overall notify the facility of a hazard. Existing procedures and training should also be improved to ensure that all personnel are educated on what to do when the emergency notification systems are activated.

  20. [Considering the current state of fire safety in Taiwan's care environment from the perspective of the nation's worst recent hospital fire].

    PubMed

    Tseng, Wei-Wen; Shih, Chung-Liang; Chien, Shen-Wen

    2013-04-01

    Taiwan's worst hospital fire in history on October 23rd, 2012 at Sinying Hospital's Bei-Men Branch resulted in 13 elderly patient deaths and over 70 injuries. The heavy casualties were due in part to the serious condition of patients. Some patients on life-support machines were unable to move or be moved. This disaster highlights the issue of fire safety in small-scale hospitals that have transformed existing hospital space into special care environments for elderly patients. Compared with medical centers and general hospitals, these small-scale health facilities are ill equipped to deal properly with fire safety management and emergency response issues due to inadequate fire protection facilities, fire safety equipment, and human resources. Small-scale facilities that offer health care and medical services to mostly immobile patients face fire risks that differ significantly from general health care facilities. This paper focuses on fire risks in small-scale facilities and suggests a strategy for fire prevention and emergency response procedures, including countermeasures for fire risk assessment, management, and emergency response, in order to improve fire safety at these institutions in Taiwan.

  1. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  2. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  3. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... appropriate fire safety precautions in their work; (i) Keep facilities in the safest condition practicable... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention...

  4. Locomotor effects of a low-frequency fire alarm on C57BL/6 male mice: a preliminary study.

    PubMed

    Povroznik, Jessica M; Faith, Robert E; Kessler, Matthew J; Ali, Frank N; Kosik, James; Prince, Stephen; Engler-Chiurazzi, Elizabeth B

    2017-12-01

    Maintaining appropriate acoustic conditions for animal welfare and data collection are crucial in biomedical research facilities. Negative impacts of disruptive sound are known and can include auditory damage, immune function changes, and behavioral alterations. One type of disruptive sound occurring in research facilities is that of fire alarms. To ameliorate this problem, many facilities have incorporated the use of low-frequency fire alarms that emit tones outside the rodent audible range. The impact of these devices has been assumed to be negligible. However, this has yet to be evaluated with controlled behavioral experiments. Thus, our objective was to investigate the impact of low-frequency fire alarm exposure on locomotor behavior in the open field, a test sensitive to acoustic stimuli disruption. Male mice were randomized to three alarm exposure groups (No-Alarm; Alarm-During; and Alarm-After) and placed in individual photobeam-activated locomotor chambers. The Alarm-During group displayed significantly reduced horizontal locomotion, with a trend towards reduced vertical locomotion. These data suggest that a low-frequency brief alarm tone can temporarily disrupt movement, a valuable insight should an alarm be deployed. Further, findings support close collaboration between researchers and institutional facility staff to ensure appropriate acoustic conditions are maintained, whenever possible, for research animals.

  5. Overview of 10 inch Diameter HTPB Hybrid Motor Testing with Liquid Oxygen at Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Knowles, Timothy E.; Kearney, Darren; Roberts, Ryan

    2005-01-01

    To further explore the operation of hybrid rocket motors and to demonstrate the performance characteristics of the motor design Lockheed Martin funded research on a series of 10 inch diameter hybrid motors that produce less than 10 klbf sea level thrust. This test series was given the name "Hybrid Technology Test Program." These motors were fired in the existing test stand at the SSC E-3 complex Cell 1. The fuel and oxidizer for these 10 inch diameter motors are HTPB and LO2, respectively. The original goal of the testing was to verify that the predicted performance matched the actual performance of these 10 inch motors (ref. figure 1) and then confirm that the motors performed acceptably. For this element of testing horizontally fired hybrid motors will be tested using LO2 supplied from the existing facility 100 gallon LO2 tank that is pressurized with facility GN2. The thrust produced by the motor will be measured by a Lockheed Martin supplied load cell.

  6. Aerosol can puncture device operational test plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leist, K.J.

    1994-05-03

    Puncturing of aerosol cans is performed in the Waste Receiving and Processing Facility Module 1 (WRAP 1) process as a requirement of the waste disposal acceptance criteria for both transuranic (TRU) waste and low-level waste (LLW). These cans have contained such things as paints, lubricating oils, paint removers, insecticides, and cleaning supplies which were used in radioactive facilities. Due to Westinghouse Hanford Company (WHC) Fire Protection concerns of the baseline system`s fire/explosion proof characteristics, a study was undertaken to compare the baseline system`s design to commercially available puncturing devices. While the study found no areas which might indicate a riskmore » of fire or explosion, WHC Fire Protection determined that the puncturing system must have a demonstrated record of safe operation. This could be obtained either by testing the baseline design by an independent laboratory, or by substituting a commercially available device. As a result of these efforts, the commercially available Aerosolv can puncturing device was chosen to replace the baseline design. Two concerns were raised with the system. Premature blinding of the coalescing/carbon filter, due to its proximity to the puncture and draining operation; and overpressurization of the collection bottle due to its small volume and by blinding of the filter assembly. As a result of these concerns, testing was deemed necessary. The objective of this report is to outline test procedures for the Aerosolv.« less

  7. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  8. 33 CFR 127.601 - Fire equipment: General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...

  9. Aerospace Test Facilities at NASA LeRC Plumbrook

    NASA Technical Reports Server (NTRS)

    1992-01-01

    An overview of the facilities and research being conducted at LeRC's Plumbrook field station is given. The video highlights four main structures and explains their uses. The Space Power Facility is the world's largest space environment simulation chamber, where spacebound hardware is tested in simulations of the vacuum and extreme heat and cold of the space plasma environment. This facility was used to prepare Atlas 1 rockets to ferry CRRES into orbit; it will also be used to test space nuclear electric power generation systems. The Spacecraft Propulsion Research Facility allows rocket vehicles to be hot fired in a simulated space environment. In the Cryogenic Propellant Tank Facility, researchers are developing technology for storing and transferring liquid hydrogen in space. There is also a Hypersonic Wind Tunnel which can perform flow tests with winds up to Mach 7.

  10. Aerospace test facilities at NASA LERC Plumbrook

    NASA Astrophysics Data System (ADS)

    1992-10-01

    An overview of the facilities and research being conducted at LeRC's Plumbrook field station is given. The video highlights four main structures and explains their uses. The Space Power Facility is the worlds largest space environment simulation chamber, where spacebound hardware is tested in simulations of the vacuum and extreme heat and cold of the space plasma environment. This facility was used to prepare Atlas 1 rockets to ferry CRRES into orbit; it will also be used to test space nuclear electric power generation systems. The Spacecraft Propulsion Research Facility allows rocket vehicles to be hot fired in a simulated space environment. In the Cryogenic Propellant Tank Facility, researchers are developing technology for storing and transferring liquid hydrogen in space. There is also a Hypersonic Wind Tunnel which can perform flow tests with winds up to Mach 7.

  11. 41 CFR 102-74.355 - With what accident and fire prevention standards must Federal facilities comply?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false With what accident and fire prevention standards must Federal facilities comply? 102-74.355 Section 102-74.355 Public...

  12. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  13. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  14. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under Table 149.409 of this part, each helicopter fueling facility must have a fire protection...

  15. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under Table 149.409 of this part, each helicopter fueling facility must have a fire protection...

  16. 33 CFR 149.418 - What fire protection system must a helicopter fueling facility have?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a helicopter fueling facility have? 149.418 Section 149.418 Navigation and Navigable Waters COAST... protection system must a helicopter fueling facility have? In addition to the portable fire extinguishers required under table 149.409, each helicopter fueling facility must have a fire protection system complying...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattes, R.H.; Bacho, A.; Wade, L.V.

    The Lake Lynn Laboratory is a multipurpose mining research laboratory operated by the Bureau of Mines and located in Fairchance, Pa. It consists of both surface and underground facilities. The initial focus of the facility, scheduled for full operation in fall 1982, will be on the problems of fires and explosions in mines. The initial experimental explosion was fired on March 3, 1982. The intent of this document is to provide the reader with detailed information on the physical capabilities of the Lake Lynn Laboratory. Subsequent publications will focus on the capabilities of Lake Lynn as compared with those ofmore » other similar facilities worldwide, and a comparison of initial explosion test results realized at Lake Lynn and comparable results from the Bruceton Experimental Mines.« less

  18. Emissions and efficiency performance of industrial-coal-stoker fired boilers: inorganic trace elements and polynuclear aromatic hydrocarbon emissions. Volume 2. [74 inorganic trace elements and 21 polycyclic aromatic hydrocarbons

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-08-01

    This report presents the results of tests for polynuclear aromatic hydrocarbons (PAH) and inorganic trace elements in the effluent of eleven coal stoker fired boilers. These data are part of a larger stoker test program whose main objective was to produce information which will increase the ability of the boiler manufacturers to design and fabricate stoker boilers that are an economical and environmentally satisfactory alternative to oil and gas-fired units. The objectives of the SASS testing portion of this program are to determine the organic and inorganic makeup of boiler emissions which cannot be detected by using the standard EPAmore » Method 5 train. SASS tests were conducted in accordance with EPA Level 1 guidelines. Twenty-three SASS tests were run on 11 different coal stoker fired boilers to determine emissions data for 74 inorganic trace elements and 21 PAHs. The emissions of most concern are the suspected carcinogens or the emissions with high probability of being carcinogens. The inorganic trace elements that were investigated and are listed as carcinogens and high probability carcinogens by the Office of Air Quality Planning and Standards are: arsenic, beryllium, cadmium, and nickel. The SASS emissions data are presented in three different sets of units: nonograms per joule of energy input, micrograms per dry standard cubic meter of flue gas sampled, and grams per kilograms of fuel input. To protect the interests of the host boiler facilities, each site has been given a letter designation. A complete description of each unit and all tests run at each site can be found in the corresponding site reports referenced at the end of this report. This report contains a description of the test equipment and procedures, analytical procedures, data reduction techniques, the test data, and a brief description of each facility tested and the coals fired. 4 figures, 16 tables.« less

  19. Safer Aviation Materials Tested

    NASA Technical Reports Server (NTRS)

    Palaszewski, Bryan A.

    2001-01-01

    A series of thermally stable polymer samples were tested. These materials are called low heat release materials and are designed for aircraft interior decorative materials. The materials are designed to give off a minimum amount of noxious gases when heated, which increases the possibility that people can escape from a burning aircraft. New cabin materials have suitably low heat release so that fire does not spread, toxic chemicals are not given off, and the fire-emergency escape time for crew and passengers is lengthened. These low heat-release materials have a variety of advantages and applications: interiors for ground-based facilities, interiors of space vehicles, and many commercial fire-protection environments. A microscale combustion calorimeter at the Federal Aviation Administration's (FAA) Technical Center tested NASA Langley Research Center materials samples. The calorimeter is shown. A sharp, quantitative, and reproducible heat-release-rate peak is obtained in the microscale heat-release-rate test. The newly tested NASA materials significantly reduced the heat release capacity and total heat release. The thermal stability and flammability behavior of the samples was very good. The new materials demonstrated a factor of 4 reduction in total heat release over ULTEM (a currently used material). This information is provided in the following barchart. In other tests, the materials showed greater than a factor 9 reduction in heat-release capacity over ULTEM. The newly tested materials were developed for low dielectric constant, low color, and good solubility. A scale up of the material samples is needed to determine the repeatability of the performance in larger samples. Larger panels composed of the best candidate materials will be tested in a larger scale FAA Technical Center fire facility. The NASA Glenn Research Center, Langley (Jeff Hinkley), and the FAA Technical Center (Richard Lyon) cooperatively tested these materials for the Accident Mitigation aspects of Fire Prevention under NASA's Aviation Safety Program.

  20. ARC-2006-ACD06-0177-010

    NASA Image and Video Library

    2006-10-10

    CEV (Crew Escape Vehicle) capsule Balistic Range testing to examine static and dynamic stability characteristics (at the Hypervelocity Free-Flight Facility) HFF Chuck Cornelison operating 'Firing' control pannel

  1. Skylab Medical Experiments Altitude Test /SMEAT/ facility design and operation.

    NASA Technical Reports Server (NTRS)

    Hinners, A. H., Jr.; Correale, J. V.

    1973-01-01

    This paper presents the design approaches and test facility operation methods used to successfully accomplish a 56-day test for Skylab to permit evaluation of selected Skylab medical experiments in a ground test simulation of the Skylab environment with an astronaut crew. The systems designed for this test include the two-gas environmental control system, the fire suppression and detection system, equipment transfer lock, ground support equipment, safety systems, potable water system, waste management system, lighting and power system, television monitoring, communications and recreation systems, and food freezer.

  2. Development of a multiple gas analyzer using cavity ringdown spectroscopy for use in advanced fire detection.

    PubMed

    Fallows, Eric A; Cleary, Thomas G; Miller, J Houston

    2009-02-01

    A portable cavity ringdown spectroscopy (CRDS) apparatus was used to detect effluents from small test fires in the Fire Emulator/Detector Evaluator (FE/DE) and a small room in the Building Fire and Research Laboratory at the National Institute of Standards and Technology (NIST). The output from two lasers is combined to detect four combustion gases, CO, CO(2), HCN, and C(2)H(2), near simultaneously using CRDS. The goal of this work was to demonstrate the feasibility of using a CRDS sensor as a fire detector. Fire effluents were extracted from several test facilities and measurements of CO, CO(2), HCN, and C(2)H(2) were obtained every 25-30 s. In the FE/DE test, peak concentrations of the gases from smoldering paper were 420 parts in 10(6) (ppm) CO, 1600 ppm CO(2), 530 parts in 10(9) (ppb) HCN, and 440 ppb C(2)H(2). Peak gas concentrations from the small room were 270 ppm CO, 2100 ppm CO(2), and 310 ppb C(2)H(2).

  3. The Use of Environmental Test Facilities for Purposes Beyond Their Original Design

    NASA Technical Reports Server (NTRS)

    Fisher, Terry C.; Marner, W. J.

    2000-01-01

    Increasing demands from space flight project offices are requiring environmental testing facilities to become more versatile with increased capabilities. At the same time, maintaining a cost-effective approach to test operations has driven efforts to use these facilities for purposes beyond their original design. This paper presents an overview of the Jet Propulsion Laboratory's efforts to provide JPL's space flight projects with test facilities to meet unique test requirements and to serve the needs of selected outside customers. The large number of recent Mars Missions, including the Mars Pathfinder project, have required testing of components and systems in a Martian surface environment in facilities originally designed for deep space testing. The unique problems associated with performing these tests are discussed, along with practical solutions. Other unique test requirements are discussed including the use of space simulation chambers for testing high altitude balloon gondolas and the use of vacuum chambers for system level test firing of an ion propulsion engine.

  4. DoD Is Not Properly Monitoring the Initiation of Maintenance for Facilities at Kandahar Airfield, Afghanistan (REDACTED)

    DTIC Science & Technology

    2013-09-30

    fire sprinkler system during the initial construction of the RSOI facilities. The construction contract to build the RSOI...International Building Code. Compliant manual and automatic fire alarm and notification systems , portable fire extinguishers, fire sprinkler systems ...automatic fire sprinkler system that was not operational, a fire department connection that was obstructed, and a fire detection system

  5. Tested by Fire - How two recent Wildfires affected Accelerator Operations at LANL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spickermann, Thomas

    2012-08-01

    In a little more than a decade two large wild fires threatened Los Alamos and impacted accelerator operations at LANL. In 2000 the Cerro Grande Fire destroyed hundreds of homes, as well as structures and equipment at the DARHT facility. The DARHT accelerators were safe in a fire-proof building. In 2011 the Las Conchas Fire burned about 630 square kilometers (250 square miles) and came dangerously close to Los Alamos/LANL. LANSCE accelerator operations Lessons Learned during Las Conchas fire: (1) Develop a plan to efficiently shut down the accelerator on short notice; (2) Establish clear lines of communication in emergencymore » situations; and (3) Plan recovery and keep squirrels out.« less

  6. Spacecraft Fire Safety Research at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Meyer, Marit

    2016-01-01

    Appropriate design of fire detection systems requires knowledge of both the expected fire signature and the background aerosol levels. Terrestrial fire detection systems have been developed based on extensive study of terrestrial fires. Unfortunately there is no corresponding data set for spacecraft fires and consequently the fire detectors in current spacecraft were developed based upon terrestrial designs. In low gravity, buoyant flow is negligible which causes particles to concentrate at the smoke source, increasing their residence time, and increasing the transport time to smoke detectors. Microgravity fires have significantly different structure than those in 1-g which can change the formation history of the smoke particles. Finally the materials used in spacecraft are different from typical terrestrial environments where smoke properties have been evaluated. It is critically important to detect a fire in its early phase before a flame is established, given the fixed volume of air on any spacecraft. Consequently, the primary target for spacecraft fire detection is pyrolysis products rather than soot. Experimental investigations have been performed at three different NASA facilities which characterize smoke aerosols from overheating common spacecraft materials. The earliest effort consists of aerosol measurements in low gravity, called the Smoke Aerosol Measurement Experiment (SAME), and subsequent ground-based testing of SAME smoke in 55-gallon drums with an aerosol reference instrument. Another set of experiments were performed at NASAs Johnson Space Center White Sands Test Facility (WSTF), with additional fuels and an alternate smoke production method. Measurements of these smoke products include mass and number concentration, and a thermal precipitator was designed for this investigation to capture particles for microscopic analysis. The final experiments presented are from NASAs Gases and Aerosols from Smoldering Polymers (GASP) Laboratory, with selected results focusing on realistic fuel preparations and heating profiles with regards to early detection of smoke. SAFFIRE is the upcoming large-scale fire experiment which will be executed in a Cygnus vehicle after it undocks from the ISS.

  7. The 0.040-scale space shuttle orbiter base heating model tests in the Lewis Research Center space power facility

    NASA Technical Reports Server (NTRS)

    Dezelick, R. A.

    1976-01-01

    Space shuttle base heating tests were conducted using a 0.040-scale model in the Plum Brook Space Power Facility of The NASA Lewis Research Center. The tests measured heat transfer rates, pressure distributions, and gas recovery temperatures on the orbiter vehicle 2A base configuration resulting from engine plume impingement. One hundred and sixty-eight hydrogen-oxygen engine firings were made at simulated flight altitudes ranging from 120,000 to 360,000 feet.

  8. A Summary of NASA and USAF Hypergolic Propellant Related Spills and Fires

    NASA Technical Reports Server (NTRS)

    Nufer, Brian

    2010-01-01

    Several unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, the Titan Program, and a few others have occurred over the past several decades. Spill sites include the following government facilities: Kennedy Space Center (KSC), Johnson Space Center (JSC), White Sands Test Facility (WSTF), Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS), Edwards Air Force Base (EAFB), Little Rock AFB, and McConnell AFB. Until now, the only method of capturing the lessons learned from these incidents has been "word of mouth" or by studying each individual incident report. Through studying several dozen of these incidents, certain root cause themes are apparent. Scrutinizing these themes could prove to be highly beneficial to future hypergolic system test, checkout, and operational use.

  9. Audit Report, "Fire Protection Deficiencies at Los Alamos National Laboratory"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2009-06-01

    The Department of Energy's Los Alamos National Laboratory (Los Alamos) maintains some of the Nation's most important national security assets, including nuclear materials. Many of Los Alamos' facilities are located in close proximity to one another, are occupied by large numbers of contract and Federal employees, and support activities ranging from nuclear weapons design to science-related activities. Safeguarding against fires, regardless of origin, is essential to protecting employees, surrounding communities, and national security assets. On June 1, 2006, Los Alamos National Security, LLC (LANS), became the managing and operating contractor for Los Alamos, under contract with the Department's National Nuclearmore » Security Administration (NNSA). In preparation for assuming its management responsibilities at Los Alamos, LANS conducted walk-downs of the Laboratory's facilities to identify pre-existing deficiencies that could give rise to liability, obligation, loss or damage. The walk-downs, which identified 812 pre-existing fire protection deficiencies, were conducted by subject matter professionals, including fire protection experts. While the Los Alamos Site Office has overall responsibility for the effectiveness of the fire protection program, LANS, as the Laboratory's operating contractor, has a major, day-to-day role in minimizing fire-related risks. The issue of fire protection at Los Alamos is more than theoretical. In May 2000, the 'Cerro Grande' fire burned about 43,000 acres, including 7,700 acres of Laboratory property. Due to the risk posed by fire to the Laboratory's facilities, workforce, and surrounding communities, we initiated this audit to determine whether pre-existing fire protection deficiencies had been addressed. Our review disclosed that LANS had not resolved many of the fire protection deficiencies that had been identified in early 2006: (1) Of the 296 pre-existing deficiencies we selected for audit, 174 (59 percent) had not been corrected; and, (2) A substantial portion of the uncorrected deficiencies, 86 (49 percent) were considered by the walk-down teams to be significant enough to warrant compensatory actions until the deficiency was corrected or was tracked to closure through implementation of corrective actions. Further, we found that 32 of the significant deficiencies had been closed by the previous Los Alamos contractor, prior to LANS assuming responsibility for operation of the Laboratory, even though the deficiencies had not been corrected. A fire protection expert provided technical support during the audit. As an example of uncorrected problems, LANS had not resolved, by performing periodic tests, a deficiency identified in 2006 regarding a kitchen hood fire suppression system in a facility located within the Los Alamos Neutron Science Center. Such systems are required to be tested twice a year by the National Fire Protection Association standard, a standard that had been adopted by Department of Energy under DOE Order 420.1B. Yet, in 2006, the LANS walk-down team recognized that this system had not been inspected since May 2004 and noted that deficient suppression systems could result in significantly high levels of property damage and loss. After we brought this issue to management's attention on February 6, 2009, LANS officials stated that the Laboratory would correct this deficiency. As with the problems involving the fire suppression system, we observed that LANS had not always corrected life safety deficiencies involving building exits at one of its primary facilities. This included providing a secondary emergency exit for a building with occupants on multiple floor levels. LANS had removed personnel from the third floor and improved the sprinkler system of the facility, but it had still not provided a secondary exit for personnel on the second floor by the time we completed our review. NNSA has since stated that this fire protection issue will be completely addressed by relocating personnel from the second floor. Perhaps most serious, our testing revealed that a number of deficiencies were formally closed even though actual corrective action had not been completed. Notably, we observed that action had not been taken to resolve a recommendation to replace a fire alarm panel found to be unreliable. After the walk-down was conducted but prior to contract transition, the former contractor closed the recommendation in its action tracking database even though the panel had not been replaced. The walk-down team had categorized the fire alarm system as requiring replacement since it had been modified many times, was old and obsolete, and had very limited available spare parts. In fact, the walk-down team concluded that the panel 'must be considered to be unreliable and should have a very high priority for replacement'.« less

  10. 7. Credit BG. View looking west into small solid rocket ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Credit BG. View looking west into small solid rocket motor testing bay of Test Stand 'E' (Building 4259/E-60). Motors are mounted on steel table and fired horizontally toward the east. - Jet Propulsion Laboratory Edwards Facility, Test Stand E, Edwards Air Force Base, Boron, Kern County, CA

  11. 34. Historic photo of Building 202 test cell with damage ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. Historic photo of Building 202 test cell with damage from fire or explosion during rocket engine testing, May 17, 1958. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-47965. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  12. 37. Historic photo of Building 202 test cell interior, with ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Historic photo of Building 202 test cell interior, with damage related to hydrogen fire during rocket engine testing, April 25, 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-50473. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  13. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  14. 36 CFR 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  15. 36 CFR 1234.10 - What are the facility requirements for all records storage facilities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the HVAC systems, fire alarm and fire protection systems. Manual switching between sources of service... elements are protected by a properly installed, properly maintained wet-pipe automatic sprinkler system, as... must provide documentation that the facility has a fire suppression system specifically designed to...

  16. 77 FR 70172 - Lifesaving and Fire-Fighting Equipment, Training and Drills Onboard Offshore Facilities and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Equipment, Training and Drills Onboard Offshore Facilities and Mobile Offshore Drilling Units (MODUs... lifesaving and fire-fighting equipment, training and drills on board offshore facilities and MODUs operating... guidance concerning lifesaving and fire-fighting equipment, training, and drills onboard manned offshore...

  17. Validation experiments to determine radiation partitioning of heat flux to an object in a fully turbulent fire.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ricks, Allen; Blanchat, Thomas K.; Jernigan, Dann A.

    2006-06-01

    It is necessary to improve understanding and develop validation data of the heat flux incident to an object located within the fire plume for the validation of SIERRA/ FUEGO/SYRINX fire and SIERRA/CALORE. One key aspect of the validation data sets is the determination of the relative contribution of the radiative and convective heat fluxes. To meet this objective, a cylindrical calorimeter with sufficient instrumentation to measure total and radiative heat flux had been designed and fabricated. This calorimeter will be tested both in the controlled radiative environment of the Penlight facility and in a fire environment in the FLAME/Radiant Heatmore » (FRH) facility. Validation experiments are specifically designed for direct comparison with the computational predictions. Making meaningful comparisons between the computational and experimental results requires careful characterization and control of the experimental features or parameters used as inputs into the computational model. Validation experiments must be designed to capture the essential physical phenomena, including all relevant initial and boundary conditions. A significant question of interest to modeling heat flux incident to an object in or near a fire is the contribution of the radiation and convection modes of heat transfer. The series of experiments documented in this test plan is designed to provide data on the radiation partitioning, defined as the fraction of the total heat flux that is due to radiation.« less

  18. Firing Room Remote Application Software Development

    NASA Technical Reports Server (NTRS)

    Liu, Kan

    2015-01-01

    The Engineering and Technology Directorate (NE) at National Aeronautics and Space Administration (NASA) Kennedy Space Center (KSC) is designing a new command and control system for the checkout and launch of Space Launch System (SLS) and future rockets. The purposes of the semester long internship as a remote application software developer include the design, development, integration, and verification of the software and hardware in the firing rooms, in particular with the Mobile Launcher (ML) Launch Accessories (LACC) subsystem. In addition, a software test verification procedure document was created to verify and checkout LACC software for Launch Equipment Test Facility (LETF) testing.

  19. 36 CFR § 1234.12 - What are the fire safety requirements that apply to records storage facilities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... records storage facilities? (a) The fire detection and protection systems must be designed or reviewed by a licensed fire protection engineer. If the system was not designed by a licensed fire protection... engineer that describes the design intent of the fire detection and suppression system, detailing the...

  20. Three-phase foam analysis and development of a lab-scale foaming capacity and stability test for swine manure

    USDA-ARS?s Scientific Manuscript database

    Foam accumulation on the manure slurry at deep pit swine facilities has been linked to flash fire incidents, making it a serious safety concern for pork producers. In order to investigate this phenomenon, samples of swine manure were collected from over 50 swine production facilities in Iowa with va...

  1. Stockpile Stewardship: How We Ensure the Nuclear Deterrent Without Testing

    ScienceCinema

    None

    2018-01-16

    In the 1990s, the U.S. nuclear weapons program shifted emphasis from developing new designs to dismantling thousands of existing weapons and maintaining a much smaller enduring stockpile. The United States ceased underground nuclear testing, and the Department of Energy created the Stockpile Stewardship Program to maintain the safety, security, and reliability of the U.S. nuclear deterrent without full-scale testing. This video gives a behind the scenes look at a set of unique capabilities at Lawrence Livermore that are indispensable to the Stockpile Stewardship Program: high performance computing, the Superblock category II nuclear facility, the JASPER a two stage gas gun, the High Explosive Applications Facility (HEAF), the National Ignition Facility (NIF), and the Site 300 contained firing facility.

  2. 40 CFR 61.41 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Beryllium Rocket Motor..., or in this section as follows: (a) Rocket motor test site means any building, structure, facility, or installation where the static test firing of a beryllium rocket motor and/or the disposal of beryllium...

  3. 40 CFR 61.41 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Beryllium Rocket Motor..., or in this section as follows: (a) Rocket motor test site means any building, structure, facility, or installation where the static test firing of a beryllium rocket motor and/or the disposal of beryllium...

  4. 40 CFR 61.41 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Beryllium Rocket Motor..., or in this section as follows: (a) Rocket motor test site means any building, structure, facility, or installation where the static test firing of a beryllium rocket motor and/or the disposal of beryllium...

  5. 40 CFR 61.41 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Beryllium Rocket Motor..., or in this section as follows: (a) Rocket motor test site means any building, structure, facility, or installation where the static test firing of a beryllium rocket motor and/or the disposal of beryllium...

  6. 40 CFR 61.41 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Beryllium Rocket Motor..., or in this section as follows: (a) Rocket motor test site means any building, structure, facility, or installation where the static test firing of a beryllium rocket motor and/or the disposal of beryllium...

  7. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  8. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  9. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... for Fossil-Fuel-Fired Steam Generators § 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this subpart apply are: (1) Each fossil-fuel-fired... per hour (MMBtu/hr)). (2) Each fossil-fuel and wood-residue-fired steam generating unit capable of...

  10. Space Shuttle Main Engine Low Pressure Oxidizer Turbo-Pump Inducer Dynamic Environment Characterization through Water Model and Hot-Fire Testing

    NASA Technical Reports Server (NTRS)

    Arellano, Patrick; Patton, Marc; Schwartz, Alan; Stanton, David

    2006-01-01

    The Low Pressure Oxidizer Turbopump (LPOTP) inducer on the Block II configuration Space Shuttle Main Engine (SSME) experienced blade leading edge ripples during hot firing. This undesirable condition led to a minor redesign of the inducer blades. This resulted in the need to evaluate the performance and the dynamic environment of the redesign, relative to the current configuration, as part of the design acceptance process. Sub-scale water model tests of the two inducer configurations were performed, with emphasis on the dynamic environment due to cavitation induced vibrations. Water model tests were performed over a wide range of inlet flow coefficient and pressure conditions, representative of the scaled operating envelope of the Block II SSME, both in flight and in ground hot-fire tests, including all power levels. The water test hardware, facility set-up, type and placement of instrumentation, the scope of the test program, specific test objectives, data evaluation process and water test results that characterize and compare the two SSME LPOTP inducers are discussed. In addition, dynamic characteristics of the two water models were compared to hot fire data from specially instrumented ground tests. In general, good agreement between the water model and hot fire data was found, which confirms the value of water model testing for dynamic characterization of rocket engine turbomachinery.

  11. KSC-04PD-0679

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers check the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft after completing rotation on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  12. KSC-04PD-0677

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers again rotate the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  13. KSC-04PD-0673

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers begin to rotate the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  14. KSC-04PD-0674

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers begin to rotate the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  15. KSC-04PD-0678

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers complete rotation of the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  16. KSC-04PD-0675

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers check the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft as it rotates on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  17. 39. Historic photo of Building 202 test cell exterior, showing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Historic photo of Building 202 test cell exterior, showing fiberglass cladding blown out by hydrogen fire during rocket engine testing, April 27, 1959. On file at NASA Plumbrook Research Center, Sandusky, Ohio. NASA photo number C-50472. - Rocket Engine Testing Facility, GRC Building No. 202, NASA Glenn Research Center, Cleveland, Cuyahoga County, OH

  18. Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, K.; Melendez, M.; Gonzales, J.

    To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. This handbook covers the primary elements that must be considered when developing a CNG vehicle maintenance facility design that will protectmore » against the ignition of natural gas releases. It also discusses specific protocols and training needed to ensure safety.« less

  19. Fire safety knowledge and practices among residents of an assisted living facility.

    PubMed

    Jaslow, David; Ufberg, Jacob; Yoon, Russell; McQueen, Clay; Zecher, Derek; Jakubowski, Greg

    2005-01-01

    Assisted living facilities (ALFs) pose unique fire risks to the elderly that may be linked to specific fire safety (FS) practices. To evaluate self-reported FS practices among ALF residents. All residents of a small ALF were surveyed regarding actual and hypothetical FS behaviors, self-perceived fire risk, and FS preparedness. Fifty-eight ALF residents completed the survey. Thirty-three (58%) individuals reported one or more disabilities. Seven (12%) residents ignored the fire alarm and 21 (35%) could not hear it clearly. Sixteen (28%) residents would attempt to locate the source of a fire rather than escape from the building. Only 24 (42%) residents were familiar with the building fire plan. Twenty-three (40%) people surveyed believed that they were not at risk of fire in the study facility. Residents of an ALF may be at increased fire injury risk due to their FS practices and disabilities.

  20. Taurus II Stage Test Simulations: Using Large-Scale CFD Simulations to Provide Critical Insight into Plume Induced Environments During Design

    NASA Technical Reports Server (NTRS)

    Struzenberg, L. L.; West, J. S.

    2011-01-01

    This paper describes the use of targeted Loci/CHEM CFD simulations to evaluate the effects of a dual-engine first-stage hot-fire test on an evolving integrated launch pad/test article design. This effort was undertaken as a part of the NESC Independent Assessment of the Taurus II Stage Test Series. The underlying conceptual model included development of a series of computational models and simulations to analyze the plume induced environments on the pad, facility structures and test article. A pathfinder simulation was first developed, capable of providing quick-turn around evaluation of plume impingement pressures on the flame deflector. Results from this simulation were available in time to provide data for an ongoing structural assessment of the deflector. The resulting recommendation was available in a timely manner and was incorporated into construction schedule for the new launch stand under construction at Wallops Flight Facility. A series of Reynolds-Averaged Navier-Stokes (RANS) quasi-steady simulations representative of various key elements of the test profile was performed to identify potential concerns with the test configuration and test profile. As required, unsteady Hybrid-RANS/LES simulations were performed, to provide additional insight into critical aspects of the test sequence. Modifications to the test-specific hardware and facility structures thermal protection as well as modifications to the planned hot-fire test profile were implemented based on these simulation results.

  1. Inadequate Contract Oversight of Military Construction Projects in Afghanistan Resulted in Increased Hazards to Life and Safety of Coalition Forces

    DTIC Science & Technology

    2013-03-08

    applicable fire protection standards for two of the three projects we reviewed that required a fire sprinkler system . Specifically, the Secure...RSOI and Command and Control facilities do not have fire sprinkler systems as required by Unified Facilities Criteria 3-600-01, Section 4-2.2...stated that, as such, those facilities did not need fire sprinkler systems . Based on the justification provided by the Air Force on the DD Form 1391s

  2. 41 CFR 102-74.360 - What are the specific accident and fire prevention responsibilities of occupant agencies?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... accident and fire prevention responsibilities of occupant agencies? 102-74.360 Section 102-74.360 Public... MANAGEMENT REGULATION REAL PROPERTY 74-FACILITY MANAGEMENT Facility Management Accident and Fire Prevention § 102-74.360 What are the specific accident and fire prevention responsibilities of occupant agencies...

  3. Manual for Public School Facilities: Fire Prevention and Fire Inspection.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Bureau of Educational Management Services.

    This manual is designed for use by New York public school administrators and facility inspectors, providing instruction for completing the state's Fire Safety Report. It provides background information and details about the State Fire Prevention and Building Code and regulations, and explains the inspection and enforcement processes. One-third of…

  4. The Environmental Challenge of Military Munitions and Federal Facilities

    EPA Pesticide Factsheets

    EPA and the Department of Defense (DoD) must address the contamination legacy left by military munitions and explosives of concern (MEC) and other hazardous munitions materials from military live-fire training or testing.

  5. ARC-2006-ACD06-0177-014

    NASA Image and Video Library

    2006-10-10

    CEV (Crew Escape Vehicle) capsule Balistic Range testing to examine static and dynamic stability characteristics (at the Hypervelocity Free-Flight Facility) HFF - Don Bowling (l) attaching firing cable to breeth cap as Don Holt (r) looks on

  6. RCRA Facility Investigation/Remedial Investigation Report with Baseline Risk Assessment for the Fire Department Hose Training Facility (904-113G)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palmer, E.

    1997-04-01

    This report documents the Resource Conservation and Recovery Act (RCRA) Facility Investigation/Remedial Investigation/Baseline Risk Assessment (RFI/RI/BRA) for the Fire Department Hose Training Facility (FDTF) (904-113G).

  7. Experimental program for real gas flow code validation at NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Deiwert, George S.; Strawa, Anthony W.; Sharma, Surendra P.; Park, Chul

    1989-01-01

    The experimental program for validating real gas hypersonic flow codes at NASA Ames Rsearch Center is described. Ground-based test facilities used include ballistic ranges, shock tubes and shock tunnels, arc jet facilities and heated-air hypersonic wind tunnels. Also included are large-scale computer systems for kinetic theory simulations and benchmark code solutions. Flight tests consist of the Aeroassist Flight Experiment, the Space Shuttle, Project Fire 2, and planetary probes such as Galileo, Pioneer Venus, and PAET.

  8. Stockpile Stewardship: How We Ensure the Nuclear Deterrent Without Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2014-09-04

    In the 1990s, the U.S. nuclear weapons program shifted emphasis from developing new designs to dismantling thousands of existing weapons and maintaining a much smaller enduring stockpile. The United States ceased underground nuclear testing, and the Department of Energy created the Stockpile Stewardship Program to maintain the safety, security, and reliability of the U.S. nuclear deterrent without full-scale testing. This video gives a behind the scenes look at a set of unique capabilities at Lawrence Livermore that are indispensable to the Stockpile Stewardship Program: high performance computing, the Superblock category II nuclear facility, the JASPER a two stage gas gun,more » the High Explosive Applications Facility (HEAF), the National Ignition Facility (NIF), and the Site 300 contained firing facility.« less

  9. 5. Credit BG. View looking northwest at eastern facade of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Credit BG. View looking northwest at eastern facade of Test Stand 'E' (Building 4259/E-60), solid rocket motor test facility. Central bay (high concrete walls) was used for testing large solid motors in a vertical position. A second smaller bay to the north fired smaller motors horizontally. Just south of the large bay is an equipment room with access to the tunnel system; entrance is by small single door on east side. The large double doors lead to a third bay used for X-raying solid rocket motors before testing. - Jet Propulsion Laboratory Edwards Facility, Test Stand E, Edwards Air Force Base, Boron, Kern County, CA

  10. Digital Image Correlation Techniques Applied to Large Scale Rocket Engine Testing

    NASA Technical Reports Server (NTRS)

    Gradl, Paul R.

    2016-01-01

    Rocket engine hot-fire ground testing is necessary to understand component performance, reliability and engine system interactions during development. The J-2X upper stage engine completed a series of developmental hot-fire tests that derived performance of the engine and components, validated analytical models and provided the necessary data to identify where design changes, process improvements and technology development were needed. The J-2X development engines were heavily instrumented to provide the data necessary to support these activities which enabled the team to investigate any anomalies experienced during the test program. This paper describes the development of an optical digital image correlation technique to augment the data provided by traditional strain gauges which are prone to debonding at elevated temperatures and limited to localized measurements. The feasibility of this optical measurement system was demonstrated during full scale hot-fire testing of J-2X, during which a digital image correlation system, incorporating a pair of high speed cameras to measure three-dimensional, real-time displacements and strains was installed and operated under the extreme environments present on the test stand. The camera and facility setup, pre-test calibrations, data collection, hot-fire test data collection and post-test analysis and results are presented in this paper.

  11. KSC-04PD-0676

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- At Astrotech Space Operations facilities near KSC, workers adjust wires on the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft during rotation on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  12. KSC-04PD-0671

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- At Astrotech Space Operations facilities near KSC, workers make adjustments to the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft now resting on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  13. KSC-04PD-0672

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Astrotech Space Operations facilities near KSC, workers remove protective covers from the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft now resting on the turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  14. KSC-04PD-0670

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- At Astrotech Space Operations facilities near KSC, workers help while an overhead crane lowers the Mercury Surface, Space Environment, Geochemistry and Ranging (MESSENGER) spacecraft onto a turnover fixture. Workers will perform the propulsion system phasing test firing gas through the thrusters in order to verify that the right thrusters fire when expected as part of prelaunch testing at the site. Launch is scheduled for May 11 from Pad 17-B, Cape Canaveral Air Force Station. The spacecraft will fly past Venus three times and Mercury twice before starting a year-long orbital study of Mercury in July 2009.

  15. Space Propulsion Research Facility (B-2): An Innovative, Multi-Purpose Test Facility

    NASA Technical Reports Server (NTRS)

    Hill, Gerald M.; Weaver, Harold F.; Kudlac, Maureen T.; Maloney, Christian T.; Evans, Richard K.

    2011-01-01

    The Space Propulsion Research Facility, commonly referred to as B-2, is designed to hot fire rocket engines or upper stage launch vehicles with up to 890,000 N force (200,000 lb force), after environmental conditioning of the test article in simulated thermal vacuum space environment. As NASA s third largest thermal vacuum facility, and the largest designed to store and transfer large quantities of propellant, it is uniquely suited to support developmental testing associated with large lightweight structures and Cryogenic Fluid Management (CFM) systems, as well as non-traditional propulsion test programs such as Electric and In-Space propulsion. B-2 has undergone refurbishment of key subsystems to support the NASA s future test needs, including data acquisition and controls, vacuum, and propellant systems. This paper details the modernization efforts at B-2 to support the Nation s thermal vacuum/propellant test capabilities, the unique design considerations implemented for efficient operations and maintenance, and ultimately to reduce test costs.

  16. Test Stand at the Rocket Engine Test Facility

    NASA Image and Video Library

    1973-02-21

    The thrust stand in the Rocket Engine Test Facility at the National Aeronautics and Space Administration (NASA) Lewis Research Center in Cleveland, Ohio. The Rocket Engine Test Facility was constructed in the mid-1950s to expand upon the smaller test cells built a decade before at the Rocket Laboratory. The $2.5-million Rocket Engine Test Facility could test larger hydrogen-fluorine and hydrogen-oxygen rocket thrust chambers with thrust levels up to 20,000 pounds. Test Stand A, seen in this photograph, was designed to fire vertically mounted rocket engines downward. The exhaust passed through an exhaust gas scrubber and muffler before being vented into the atmosphere. Lewis researchers in the early 1970s used the Rocket Engine Test Facility to perform basic research that could be utilized by designers of the Space Shuttle Main Engines. A new electronic ignition system and timer were installed at the facility for these tests. Lewis researchers demonstrated the benefits of ceramic thermal coatings for the engine’s thrust chamber and determined the optimal composite material for the coatings. They compared the thermal-coated thrust chamber to traditional unlined high-temperature thrust chambers. There were more than 17,000 different configurations tested on this stand between 1973 and 1976. The Rocket Engine Test Facility was later designated a National Historic Landmark for its role in the development of liquid hydrogen as a propellant.

  17. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  18. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  19. 41 CFR 301-11.11 - How do I select lodging and make lodging reservations?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... always stay in a “fire safe” facility. This is a facility that meets the fire safety requirements of the Hotel and Motel Fire Safety Act of 1990 (the Act), as amended (see 5 U.S.C. 5707a). (c) When selecting a...

  20. 33 CFR 127.1507 - Water systems for fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Water systems for fire protection... HAZARDOUS GAS Waterfront Facilities Handling Liquefied Hazardous Gas Firefighting Equipment § 127.1507 Water systems for fire protection. (a) Each waterfront facility handling LHG must have a supply of water and a...

  1. Application of the Life Safety Code to a Historic Test Stand

    NASA Technical Reports Server (NTRS)

    Askins, Bruce; Lemke, Paul R.; Lewis, William L.; Covell, Carol C.

    2011-01-01

    NASA has conducted a study to assess alternatives to refurbishing existing launch vehicle modal test facilities as opposed to developing new test facilities to meet the demands of a very fiscally constrained test and evaluation environment. The results of this study showed that Marshall Space Flight Center (MSFC) Test Stand (TS) 4550 could be made compliant, within reasonable cost and schedule impacts, if safety processes and operational limitations were put in place to meet the safety codes and concerns of the Fire Marshall. Trades were performed with key selection criteria to ensure that appropriate levels of occupant safety are incorporated into test facility design modifications. In preparation for the ground vibration tests that were to be performed on the Ares I launch vehicle, the Ares Flight and Integrated Test Office (FITO) organization evaluated the available test facility options, which included the existing mothballed structural dynamic TS4550 used by Apollo and Shuttle, alternative ground vibration test facilities at other locations, and construction of a new dynamic test stand. After an exhaustive assessment of the alternatives, the results favored modifying the TS4550 because it was the lowest cost option and presented the least schedule risk to the NASA Constellation Program for Ares Integrated Vehicle Ground Vibration Test (IVGVT). As the renovation design plans and drawings were being developed for TS4550, a safety concern was discovered the original design for the construction of the test stand, originally built for the Apollo Program and renovated for the Shuttle Program, was completed before NASA s adoption of the currently imposed safety and building codes per National Fire Protection Association Life Safety Code [NFPA 101] and International Building Codes. The initial FITO assessment of the design changes, required to make TS4550 compliant with current safety and building standards, identified a significant cost increase and schedule impact. An effort was launched to thoroughly evaluate the applicable life safety requirements, examine the context in which they were derived, and determine a means by which the TS4550 modifications could be made within budget and on schedule, while still providing the occupants with appropriate levels of safety.

  2. Temperature and heat flux datasets of a complex object in a fire plume for the validation of fire and thermal response codes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jernigan, Dann A.; Blanchat, Thomas K.

    It is necessary to improve understanding and develop temporally- and spatially-resolved integral scale validation data of the heat flux incident to a complex object in addition to measuring the thermal response of said object located within the fire plume for the validation of the SIERRA/FUEGO/SYRINX fire and SIERRA/CALORE codes. To meet this objective, a complex calorimeter with sufficient instrumentation to allow validation of the coupling between FUEGO/SYRINX/CALORE has been designed, fabricated, and tested in the Fire Laboratory for Accreditation of Models and Experiments (FLAME) facility. Validation experiments are specifically designed for direct comparison with the computational predictions. Making meaningful comparisonmore » between the computational and experimental results requires careful characterization and control of the experimental features or parameters used as inputs into the computational model. Validation experiments must be designed to capture the essential physical phenomena, including all relevant initial and boundary conditions. This report presents the data validation steps and processes, the results of the penlight radiant heat experiments (for the purpose of validating the CALORE heat transfer modeling of the complex calorimeter), and the results of the fire tests in FLAME.« less

  3. Particle Morphology and Elemental Composition of Smoke Generated by Overheating Common Spacecraft Materials

    NASA Technical Reports Server (NTRS)

    Meyer, Marit E.

    2015-01-01

    Fire safety in the indoor spacecraft environment is concerned with a unique set of fuels which are designed to not combust. Unlike terrestrial flaming fires, which often can consume an abundance of wood, paper and cloth, spacecraft fires are expected to be generated from overheating electronics consisting of flame resistant materials. Therefore, NASA prioritizes fire characterization research for these fuels undergoing oxidative pyrolysis in order to improve spacecraft fire detector design. A thermal precipitator designed and built for spacecraft fire safety test campaigns at the NASA White Sands Test Facility (WSTF) successfully collected an abundance of smoke particles from oxidative pyrolysis. A thorough microscopic characterization has been performed for ten types of smoke from common spacecraft materials or mixed materials heated at multiple temperatures using the following techniques: SEM, TEM, high resolution TEM, high resolution STEM and EDS. Resulting smoke particle morphologies and elemental compositions have been observed which are consistent with known thermal decomposition mechanisms in the literature and chemical make-up of the spacecraft fuels. Some conclusions about particle formation mechanisms are explored based on images of the microstructure of Teflon smoke particles and tar ball-like particles from Nomex fabric smoke.

  4. ENGINEERING DEVELOPMENT OF COAL-FIRED HIGH-PERFORMANCE POWER SYSTEMS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Unknown

    1999-02-01

    A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalentmore » size PC plant. The concept uses a pyrolysis process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas generated in the pyrolyzer is then used to heat the gas turbine air further before it enters the gas turbine. The project is currently in Phase 2 which includes engineering analysis, laboratory testing and pilot plant testing. Research and development is being done on the HIPPS systems that are not commercial or being developed on other projects. Pilot plant testing of the pyrolyzer subsystem and the char combustion subsystem are being done separately, and after each experimental program has been completed, a larger scale pyrolyzer will be tested at the Power Systems Development Facility (PSDF) in Wilsonville, AL. The facility is equipped with a gas turbine and a topping combustor, and as such, will provide an opportunity to evaluate integrated pyrolyzer and turbine operation. This report addresses the areas of technical progress for this quarter. A general arrangement drawing of the char transfer system was forwarded to SCS for their review. Structural steel drawings were used to generate a three-dimensional model of the char transfer system including all pressure vessels and major piping components. Experimental testing at the Combustion and Environmental Test Facility continued during this quarter. Performance of the char burner, as benchmarked by flame stability and low NOx, has been exceptional. The burner was operated successfully both without natural gas and supplemental pulverized coal.« less

  5. Quantification Of Fire Signatures For Practical Spacecraft Materials

    NASA Technical Reports Server (NTRS)

    VanderWal, Randy L.; Ruff, Gary A.; Tomasek, Aaron J.

    2003-01-01

    The overall objective of this project is to measure the fire signatures of typical spacecraft materials in 1-g and determine how these signatures may be altered in a microgravity environment. During this project, we will also develop a test technique to obtain representative low-gravity signatures. The specific tasks that will be accomplished to achieve these objectives are to: (1) measure the time history of various fire signatures of typical spacecraft materials in 1-g at varying heating rates, temperatures, convective velocities, and oxygen concentrations, (2) conduct tests in the Zero-Gravity Facility at NASA John H. Glenn Research Center to investigate the manner that a microgravity environment alters the fire signature,(3) compare 0-g and 1-g time histories and determine if 0-g data exhibits the same dependence on the test parameters as experienced in 1-g (4) develop a 1-g test technique by which 0-g fire signatures can be measured. The proposed study seeks to investigate the differences in the identities and relative concentrations of the volatiles produced by pyrolyzing and/or smoldering materials between normal gravity and microgravity environments. Test materials will be representative of typical spacecraft materials and, where possible, will be tested in appropriate geometries. Wire insulation materials of Teflon, polyimide, silicone, and PVC will be evaluated using either cylindrical samples or actual wire insulation. Other materials such as polyurethane, polyimide, melamine, and silicone-based foams will be tested using cylindrical samples, in addition to fabric materials, such as Nomex. Electrical components, such as resistors, capacitors, circuit board will also be tested.

  6. Test Results for a Non-toxic, Dual Thrust Reaction Control Engine

    NASA Technical Reports Server (NTRS)

    Robinson, Philip J.; Veith, Eric M.; Turpin, Alicia A.

    2005-01-01

    A non-toxic, dual thrust reaction control engine (RCE) was successfully tested over a broad range of operating conditions at the Aerojet Sacramento facility. The RCE utilized LOX/Ethanol propellants; and was tested in steady state and pulsing modes at 25-lbf thrust (vernier) and at 870-lbf thrust (primary). Steady state vernier tests vaned chamber pressure (Pc) from 0.78 to 5.96 psia, and mixture ratio (MR) from 0.73 to 1.82, while primary steady state tests vaned Pc from 103 to 179 psia and MR from 1.33 to 1.76. Pulsing tests explored EPW from 0.080 to 10 seconds and DC from 5 to 50 percent at both thrust levels. Vernier testing accumulated a total of 6,670 seconds of firing time, and 7,215 pulses, and primary testing accumulated a total of 2,060 seconds of firing time and 3,646 pulses.

  7. 77 FR 49830 - Notice of Lodging of Proposed Amendment to the Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... control particulate matter emissions at its Huntingdon, Pennsylvania facility (``the Huntingdon facility'') by either shutting down coal-fired boilers, installing air emission controls on the existing unit, or converting the coal-fired boilers to natural gas-fired boilers by June 30, 2012. The Commonwealth did not...

  8. Background information for Van Aken on testing of NESTT product

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reynolds, John G.

    2016-11-18

    Debris from explosives testing in a shot tank that contains 4 weight percent or less of explosive is shown to be non-reactive under the specified testing protocol in the Code of Federal Regulations. This debris can then be regarded as a non-hazardous waste on the basis of reactivity, when collected and packaged in a specified manner. If it is contaminated with radioactive components (e.g. depleted uranium), it can therefore be disposed of as radioactive waste or mixed waste, as appropriate (note that debris may contain other materials that render it hazardous, such as beryllium). We also discuss potential waste generationmore » issues in contained firing operations that are applicable to the planned new Contained Firing Facility (CFF).« less

  9. STS-119 crew visit

    NASA Image and Video Library

    2009-05-05

    Stennis Space Center Director Gene Goldman (r to l) presents a commemorative photo of a space shuttle main engine test firing to STS-119 Mission Commander Lee Archambault, Pilot Tony Antonelli and Mission Specialists Steve Swanson and Richard Arnold during the crew's May 5 visit to the facility.

  10. Commerical Crew Program - SpaceX

    NASA Image and Video Library

    2014-05-21

    A SpaceX SuperDraco engine is hot-fired at the company's test facility in McGregor, Texas. SpaceX is developing its Crew Dragon spacecraft and Falcon 9 rocket in partnership with NASA’s Commercial Crew Program to carry astronauts to and from the International Space Station.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tom Elicson; Bentley Harwood; Jim Bouchard

    Over a 12 month period, a fire PRA was developed for a DOE facility using the NUREG/CR-6850 EPRI/NRC fire PRA methodology. The fire PRA modeling included calculation of fire severity factors (SFs) and fire non-suppression probabilities (PNS) for each safe shutdown (SSD) component considered in the fire PRA model. The SFs were developed by performing detailed fire modeling through a combination of CFAST fire zone model calculations and Latin Hypercube Sampling (LHS). Component damage times and automatic fire suppression system actuation times calculated in the CFAST LHS analyses were then input to a time-dependent model of fire non-suppression probability. Themore » fire non-suppression probability model is based on the modeling approach outlined in NUREG/CR-6850 and is supplemented with plant specific data. This paper presents the methodology used in the DOE facility fire PRA for modeling fire-induced SSD component failures and includes discussions of modeling techniques for: • Development of time-dependent fire heat release rate profiles (required as input to CFAST), • Calculation of fire severity factors based on CFAST detailed fire modeling, and • Calculation of fire non-suppression probabilities.« less

  12. Wildfires

    MedlinePlus

    ... motels Expand sub-navigation Hotel fire safety tips Marijuana grow & extraction facilities Nightclubs and other assembly occupancies ... Fire behavior research Fire loss and injury research Benefits of home fire sprinklers Expand sub-navigation Environmental ...

  13. Credit BG. View looking southwest at Test Stand "D" complex. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. View looking southwest at Test Stand "D" complex. In the background at left is the Steam Generator Plant 4280/E-81 built in 1972 to house four gas-fired Clayton flash boilers. The boilers were later supplemented by the electrically heated steam accumulator (sphere) to supply steam to the various ejectors at Test Stand "D" vacuum test cells - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  14. Demonstration of SCR technology for the control of NOx emissions from high-sulfur coal-fired utility boilers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinton, W.S.; Maxwell, J.D.; Healy, E.C.

    1997-12-31

    This paper describes the completed Innovative Clean Coal Technology project which demonstrated SCR technology for reduction of flue gas NO{sub x} emissions from a utility boiler burning US high-sulfur coal. The project was sponsored by the US Department of Energy, managed and co-funded by Southern Company Services, Inc. on behalf of the Southern Company, and also co-funded by the Electric Power Research Institute and Ontario Hydro. The project was located at Gulf Power Company`s Plant Crist Unit 5 (a 75 MW tangentially-fired boiler burning US coals that had a sulfur content ranging from 2.5--2.9%), near Pensacola, Florida. The test programmore » was conducted for approximately two years to evaluate catalyst deactivation and other SCR operational effects. The SCR test facility had nine reactors: three 2.5 MW (5,000 scfm), and operated on low-dust flue gas. The reactors operated in parallel with commercially available SCR catalysts obtained from suppliers throughout the world. Long-term performance testing began in July 1993 and was completed in July 1995. A brief test facility description and the results of the project are presented in this paper.« less

  15. 6. Credit GE. Photographic copy of photograph, view looking east ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Credit GE. Photographic copy of photograph, view looking east at Test Stand 'A' during test firing of a liquid-fueled Corporal engine. Structure in immediate left foreground of view appears to be a propellant tank enclosure (JPL negative no. 383-1225, July 1945); compare HAER CA-163-A-7 for enclosure. - Jet Propulsion Laboratory Edwards Facility, Test Stand A, Edwards Air Force Base, Boron, Kern County, CA

  16. Popping a Hole in High-Speed Pursuits

    NASA Technical Reports Server (NTRS)

    2005-01-01

    NASA s Plum Brook Station, a 6,400-acre, remote test installation site for Glenn Research Center, houses unique, world-class test facilities, including the world s largest space environment simulation chamber and the world s only laboratory capable of full-scale rocket engine firings and launch vehicle system level tests at high-altitude conditions. Plum Brook Station performs complex and innovative ground tests for the U.S. Government (civilian and military), the international aerospace community, as well as the private sector. Popping a Hole in High-Speed Pursuits Recently, Plum Brook Station s test facilities and NASA s engineering experience were combined to improve a family of tire deflating devices (TDDs) that helps law enforcement agents safely, simply, and successfully stop fleeing vehicles in high-speed pursuit

  17. Recommendations related to Browns Ferry Fire

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1976-02-01

    Based on its review of the events transpiring before, during and after the Browns Ferry fire, the Review Group concludes that the probability of disruptive fires of the magnitude of the Browns Ferry event is small, and that there is no need to restrict operation of nuclear power plants for public safety. However, it is clear that much can and should be done to reduce even further the likelihood of disabling fires and to improve assurance of rapid extinguishment of fires that occur. Consideration should be given also to features that would increase further the ability of nuclear facilities tomore » withstand large fires without loss of important functions should such fires occur. The Review Group believes that improvements, especially in the areas of fire prevention and fire control, can and should be made in most existing facilities.« less

  18. Maintenance Facilities for Ammunition, Explosives, and Toxics. Design Manual 28.3.

    DTIC Science & Technology

    1981-11-01

    LOADING DOCK RAMP PROTECTION 28.3-2 8. FIRE PROTECTION 28.3-2 9. SECURITY 28.3-2 10. SAFETY 28.3-2 Section 2. GENERAL AMMUNITION MAINTENANCE SHOPS 28.3...protection in accordance with Section 3 1910.23c, Occupatioual Safety and Health Act Standards Manual. 5 8. FIRE PROTECTION. Fire protection for all...Volume 1, and Fire Protection Engineering, NAVFAC DM-8. 9. SECURITY. Maintenance facilities for ammunition, explosives, and I toxics shall be located so

  19. Testing of a Liquid Oxygen/Liquid Methane Reaction Control Thruster in a New Altitude Rocket Engine Test Facility

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Arrington, Lynn A.; Kleinhenz, Julie E.; Marshall, William M.

    2012-01-01

    A relocated rocket engine test facility, the Altitude Combustion Stand (ACS), was activated in 2009 at the NASA Glenn Research Center. This facility has the capability to test with a variety of propellants and up to a thrust level of 2000 lbf (8.9 kN) with precise measurement of propellant conditions, propellant flow rates, thrust and altitude conditions. These measurements enable accurate determination of a thruster and/or nozzle s altitude performance for both technology development and flight qualification purposes. In addition the facility was designed to enable efficient test operations to control costs for technology and advanced development projects. A liquid oxygen-liquid methane technology development test program was conducted in the ACS from the fall of 2009 to the fall of 2010. Three test phases were conducted investigating different operational modes and in addition, the project required the complexity of controlling propellant inlet temperatures over an extremely wide range. Despite the challenges of a unique propellant (liquid methane) and wide operating conditions, the facility performed well and delivered up to 24 hot fire tests in a single test day. The resulting data validated the feasibility of utilizing this propellant combination for future deep space applications.

  20. Optical properties of thermal control coating contaminated by MMH/N2O4 5-pound thruster in a vacuum environment with solar simulation

    NASA Technical Reports Server (NTRS)

    Sommers, R. D.; Raquet, C. A.; Cassidy, J. F.

    1972-01-01

    Cat-a-lac Black, and S13G thermal control coatings were exposed to the exhaust of a thruster in a simulated space environment. Vacuum was maintained at less than 10 to the minus 5th power torr during thruster firing in the liquid helium cooled facility. The thruster was fired in a 50-millisecond pulse mode and the accumulated firing time was 224 seconds. Solar absorptance (alpha sub s) and thermal emittance (sigma) of the coatings were measured in-situ at intervals of 300 pulses. A calorimetric technique was used to measure alpha sub s and sigma. The tests, technique, and test results are presented. The Cat-a-lac Black coatings showed no change in alpha sub s or sigma. The S13G showed up to 25 percent increase in alpha sub s but no change in sigma.

  1. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Astrophysics Data System (ADS)

    1981-09-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  2. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Astrophysics Data System (ADS)

    1981-09-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  3. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 4: Supplementary engineering data

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The reference conceptual design of the Magnetohydrodynamic Engineering Test Facility (ETF), a prototype 200 MWe coal-fired electric generating plant designed to demonstrate the commercial feasibility of open cycle MHD is summarized. Main elements of the design are identified and explained, and the rationale behind them is reviewed. Major systems and plant facilities are listed and discussed. Construction cost and schedule estimates, and identification of engineering issues that should be reexamined are also given. The latest (1980-1981) information from the MHD technology program are integrated with the elements of a conventional steam power electric generating plant. Supplementary Engineering Data (Issues, Background, Performance Assurance Plan, Design Details, System Design Descriptions and Related Drawings) is presented.

  4. Magnetohydrodynamics (MHD) Engineering Test Facility (ETF) 200 MWe power plant. Conceptual Design Engineering Report (CDER). Volume 2: Engineering. Volume 3: Costs and schedules

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Engineering design details for the principal systems, system operating modes, site facilities, and structures of an engineering test facility (ETF) of a 200 MWE power plant are presented. The ETF resembles a coal-fired steam power plant in many ways. It is analogous to a conventional plant which has had the coal combustor replaced with the MHD power train. Most of the ETF components are conventional. They can, however, be sized or configured differently or perform additional functions from those in a conventional coal power plant. The boiler not only generates steam, but also performs the functions of heating the MHD oxidant, recovering seed, and controlling emissions.

  5. Fires in P-3 Aircraft Oxygen Systems

    NASA Technical Reports Server (NTRS)

    Stoltzfus, Joel

    2006-01-01

    Fires in three P3 aircraft oxygen systems have occurred: one in the Royal Australian Air Force (RAAF) in 1984 and two in the U.S. Navy in 1998 and 2003. All three fires started in the aluminum manifold and check valve (MCV) assembly and produced similar damages to the aircraft in which they occurred. This paper discusses a failure analysis conducted by the NASA Johnson Space Center White Sands Test Facility (WSTF) Oxygen Hazards and Testing Team on the 2003 U.S. Navy VP62 fire. It was surmised that the fire started due to heat generated by an oxygen leak past a silicone check valve seal or possibly because of particle impact near the seat of one of the MCV assembly check valves. An additional analysis of fires in several check valve poppet seals from other aircraft is discussed. These burned poppet seals came from P3 oxygen systems that had been serviced at the Naval Air Station (NAS) in Jacksonville following standard fill procedures. It was concluded that these seal fires occurred due to the heat from compression heating, particle impact, or the heat generated by an oxygen leak past the silicone check valve seal. The fact that catastrophic fires did not occur in the case of each check valve seal fire was attributed to the protective nature of the aluminum oxide layer on the check valve poppets. To prevent future fires of this nature, the U.S. and Canadian fleets of P3 aircraft have been retrofitted with MCV assemblies with an upgraded design and more burn-resistant materials.

  6. KSC-04PD-0136

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  7. Fire hazard analysis for Plutonium Finishing Plant complex

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCKINNIS, D.L.

    1999-02-23

    A fire hazards analysis (FHA) was performed for the Plutonium Finishing Plant (PFP) Complex at the Department of Energy (DOE) Hanford site. The scope of the FHA focuses on the nuclear facilities/structures in the Complex. The analysis was conducted in accordance with RLID 5480.7, [DOE Directive RLID 5480.7, 1/17/94] and DOE Order 5480.7A, ''Fire Protection'' [DOE Order 5480.7A, 2/17/93] and addresses each of the sixteen principle elements outlined in paragraph 9.a(3) of the Order. The elements are addressed in terms of the fire protection objectives stated in paragraph 4 of DOE 5480.7A. In addition, the FHA also complies with WHC-CM-4-41,more » Fire Protection Program Manual, Section 3.4 [1994] and WHC-SD-GN-FHA-30001, Rev. 0 [WHC, 1994]. Objectives of the FHA are to determine: (1) the fire hazards that expose the PFP facilities, or that are inherent in the building operations, (2) the adequacy of the fire safety features currently located in the PFP Complex, and (3) the degree of compliance of the facility with specific fire safety provisions in DOE orders, related engineering codes, and standards.« less

  8. KSC-06pd1203

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (center) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  9. KSC-06pd1202

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - NASA Test Director Ted Mosteller (right) briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  10. KSC-06pd1201

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - Ted Mosteller (right), NASA test director, briefs the media about Firing Room 4 (FR4), which has been undergoing renovations for two years. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  11. Oxygen Compatibility Assessment of Components and Systems

    NASA Technical Reports Server (NTRS)

    Stoltzfus, Joel; Sparks, Kyle

    2010-01-01

    Fire hazards are inherent in oxygen systems and a storied history of fires in rocket engine propulsion components exists. To detect and mitigate these fire hazards requires careful, detailed, and thorough analyses applied during the design process. The oxygen compatibility assessment (OCA) process designed by NASA Johnson Space Center (JSC) White Sands Test Facility (WSTF) can be used to determine the presence of fire hazards in oxygen systems and the likelihood of a fire. This process may be used as both a design guide and during the approval process to ensure proper design features and material selection. The procedure for performing an OCA is a structured step-by-step process to determine the most severe operating conditions; assess the flammability of the system materials at the use conditions; evaluate the presence and efficacy of ignition mechanisms; assess the potential for a fire to breach the system; and determine the reaction effect (the potential loss of life, mission, and system functionality as the result of a fire). This process should be performed for each component in a system. The results of each component assessment, and the overall system assessment, should be recorded in a report that can be used in the short term to communicate hazards and their mitigation and to aid in system/component development and, in the long term, to solve anomalies that occur during engine testing and operation.

  12. Combustion performance characteristics of fine grind fuels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chow, O.K.; Levasseur, A.A.

    1996-12-31

    The objectives of this project include: (1) the development of an engineering data base which will provide detailed information on the properties of Beneficiated Coal-Based Fuels (BCFs) influencing combustion, ash deposition, ash erosion, particulate collection, and emissions; and (2) the application of this technical data base to predict the performance and economic impacts of firing the BCFs in various commercial boiler designs. To date, twelve beneficiated coal-based fuels have been acquired through PETC and tested at ABB Power Plant Laboratories Fireside Performance Test Facility (FPTF). The results from these fuels indicate that firing the BCFs improved furnace heat transfer andmore » fly ash erosion compared to their respective feed coals. This paper presents the results from a series of combustion test runs recently conducted in the FPTF to address the effect of fuel fineness on performance. A conventionally cleaned at the mine Pittsburgh No. 8 (Emerald mine, Green County, Pennsylvania, Cyprus Coal Company) was acquired and prepared at three grinds (standard, fine and ultra-fine grinds) to evaluate the effect of fuel fineness on combustion performance. The three fuels were tested at firing rates ranging from 3.0 {times} 10{sup 6} Btu/h to 4.0 {times} 10{sup 6} Btu/h, at standard (no staging) and two staged firing conditions.« less

  13. Materials Science Research Rack-1 Fire Suppressant Distribution Test Report

    NASA Technical Reports Server (NTRS)

    Wieland, P. O.

    2002-01-01

    Fire suppressant distribution testing was performed on the Materials Science Research Rack-1 (MSRR-1), a furnace facility payload that will be installed in the U.S. Lab module of the International Space Station. Unlike racks that were tested previously, the MSRR-1 uses the Active Rack Isolation System (ARIS) to reduce vibration on experiments, so the effects of ARIS on fire suppressant distribution were unknown. Two tests were performed to map the distribution of CO2 fire suppressant throughout a mockup of the MSRR-1 designed to have the same component volumes and flowpath restrictions as the flight rack. For the first test, the average maximum CO2 concentration for the rack was 60 percent, achieved within 45 s of discharge initiation, meeting the requirement to reach 50 percent throughout the rack within 1 min. For the second test, one of the experiment mockups was removed to provide a worst-case configuration, and the average maximum CO2 concentration for the rack was 58 percent. Comparing the results of this testing with results from previous testing leads to several general conclusions that can be used to evaluate future racks. The MSRR-1 will meet the requirements for fire suppressant distribution. Primary factors that affect the ability to meet the CO2 distribution requirements are the free air volume in the rack and the total area and distribution of openings in the rack shell. The length of the suppressant flowpath and degree of tortuousness has little correlation with CO2 concentration. The total area of holes in the rack shell could be significantly increased. The free air volume could be significantly increased. To ensure the highest maximum CO2 concentration, the PFE nozzle should be inserted to the stop on the nozzle.

  14. Portable Breathing Assembly

    NASA Image and Video Library

    2017-06-12

    In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, Jacobs Test and Operations Support Contract, or TOSC, technicians fill portable breathing apparatuses, or PBAS. The PBAs are to be use on board the International Space Staton to provide astronauts with breathable air in the event of a fire or other emergency situation.

  15. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA's Ares I-X rocket is seen through the windows of Firing Room One of teh Launch Control Center (LCC) at the Kennedy Space Center as it launches from pad 39b in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  16. Oxy-fuel combustion of coal and biomass, the effect on radiative and convective heat transfer and burnout

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smart, John P.; Patel, Rajeshriben; Riley, Gerry S.

    This paper focuses on results of co-firing coal and biomass under oxy-fuel combustion conditions on the RWEn 0.5 MWt Combustion Test Facility (CTF). Results are presented of radiative and convective heat transfer and burnout measurements. Two coals were fired: a South African coal and a Russian Coal under air and oxy-fuel firing conditions. The two coals were also co-fired with Shea Meal at a co-firing mass fraction of 20%. Shea Meal was also co-fired at a mass fraction of 40% and sawdust at 20% with the Russian Coal. An IFRF Aerodynamically Air Staged Burner (AASB) was used. The thermal inputmore » was maintained at 0.5 MWt for all conditions studied. The test matrix comprised of varying the Recycle Ratio (RR) between 65% and 75% and furnace exit O{sub 2} was maintained at 3%. Carbon-in-ash samples for burnout determination were also taken. Results show that the highest peak radiative heat flux and highest flame luminosity corresponded to the lowest recycle ratio. The effect of co-firing of biomass resulted in lower radiative heat fluxes for corresponding recycle ratios. Furthermore, the highest levels of radiative heat flux corresponded to the lowest convective heat flux. Results are compared to air firing and the air equivalent radiative and convective heat fluxes are fuel type dependent. Reasons for these differences are discussed in the main text. Burnout improves with biomass co-firing under both air and oxy-fuel firing conditions and burnout is also seen to improve under oxy-fuel firing conditions compared to air. (author)« less

  17. Fire endurance research at the Forest Products Laboratory

    Treesearch

    R. H. White

    1990-01-01

    Fire endurance research activities and facilities at the FPL concern the ability of a wood member or assembly to withstand the effects of fire while acting as a fire barrier and supporting a load. Fire endurance is generally concerned with the post-flashover portion of the fire. The importance of fire endurance in fire safety is reflected in building code requirements...

  18. Space Launch System Base Heating Test: Sub-Scale Rocket Engine/Motor Design, Development and Performance Analysis

    NASA Technical Reports Server (NTRS)

    Mehta, Manish; Seaford, Mark; Kovarik, Brian; Dufrene, Aaron; Solly, Nathan; Kirchner, Robert; Engel, Carl D.

    2014-01-01

    The Space Launch System (SLS) base heating test is broken down into two test programs: (1) Pathfinder and (2) Main Test. The Pathfinder Test Program focuses on the design, development, hot-fire test and performance analyses of the 2% sub-scale SLS core-stage and booster element propulsion systems. The core-stage propulsion system is composed of four gaseous oxygen/hydrogen RS-25D model engines and the booster element is composed of two aluminum-based model solid rocket motors (SRMs). The first section of the paper discusses the motivation and test facility specifications for the test program. The second section briefly investigates the internal flow path of the design. The third section briefly shows the performance of the model RS-25D engines and SRMs for the conducted short duration hot-fire tests. Good agreement is observed based on design prediction analysis and test data. This program is a challenging research and development effort that has not been attempted in 40+ years for a NASA vehicle.

  19. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  20. Finding of No Significant Impact and Finding of No Practicable Aleternative for the Environmental Assessment for the 21 Point Enclosed Firing Range at Joint-Base Andrews-Naval Air Facility Washington, Maryland

    DTIC Science & Technology

    2015-03-02

    Corps of Engineers Joint Base Andrews-Naval Air Facility Final EA – Firing Range October 2014 v WSSC Washington Suburban Sanitary Commission...are leaving the site with waste residue still on their skin and uniforms. Per section 7.6.1.7 [Latrines ( Sanitary Facilities)] in ETL 11-18 (Small...served by water, sanitary sewer, and power. A fire hydrant exists on the site, while another hydrant exists at the intersection of the entry road and

  1. Cast Coil Transformer Fire Susceptibility and Reliability Study

    DTIC Science & Technology

    1991-04-01

    transformers reduce risk to the user compared to liquid-filled units, eliminate environmental impacts, are more efficient than most transformer designs, and...filled units, eliminate environmental impacts, arc more efficient than most transformer designs, and add minimal risk to the facility in a fire situation...add minimal risk to the facility in a fire situation. Cast coil transformers have a long record of operation and have proven to be reliable and

  2. Leakage of radioactive materials from particle accelerator facilities by non-radiation disasters like fire and flooding and its environmental impacts

    NASA Astrophysics Data System (ADS)

    Lee, A.; Jung, N. S.; Mokhtari Oranj, L.; Lee, H. S.

    2018-06-01

    The leakage of radioactive materials generated at particle accelerator facilities is one of the important issues in the view of radiation safety. In this study, fire and flooding at particle accelerator facilities were considered as the non-radiation disasters which result in the leakage of radioactive materials. To analyse the expected effects at each disaster, the case study on fired and flooded particle accelerator facilities was carried out with the property investigation of interesting materials presented in the accelerator tunnel and the activity estimation. Five major materials in the tunnel were investigated: dust, insulators, concrete, metals and paints. The activation levels on the concerned materials were calculated using several Monte Carlo codes (MCNPX 2.7+SP-FISPACT 2007, FLUKA 2011.4c and PHITS 2.64+DCHAIN-SP 2001). The impact weight to environment was estimated for the different beam particles (electron, proton, carbon and uranium) and the different beam energies (100, 430, 600 and 1000 MeV/nucleon). With the consideration of the leakage path of radioactive materials due to fire and flooding, the activation level of selected materials, and the impacts to the environment were evaluated. In the case of flooding, dust, concrete and metal were found as a considerable object. In the case of fire event, dust, insulator and paint were the major concerns. As expected, the influence of normal fire and flooding at electron accelerator facilities would be relatively low for both cases.

  3. Smoke Alarms for People Who Are Deaf or Hard-of-Hearing

    MedlinePlus

    ... motels Expand sub-navigation Hotel fire safety tips Marijuana grow & extraction facilities Nightclubs and other assembly occupancies ... Fire behavior research Fire loss and injury research Benefits of home fire sprinklers Expand sub-navigation Environmental ...

  4. Compressed Natural Gas Vehicle Maintenance Facility Modification Handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Kay L.; Ramsden, Margo M.; Gonzales, John E.

    To ensure the safety of personnel and facilities, vehicle maintenance facilities are required by law and by guidelines of the National Fire Protection Association (NFPA) and the International Fire Code (IFC) to exhibit certain design features. They are also required to be fitted with certain fire protection equipment and devices because of the potential for fire or explosion in the event of fuel leakage or spills. All fuels have an explosion or fire potential if specific conditions are present. The hazard presented by liquid fuels, such as gasoline and diesel, results from the spillage of these liquids and subsequent ignitionmore » of vapors, causing a fire or explosion. Facilities that maintain liquid-fueled vehicles and implement appropriate safety measures are protected with ventilation systems designed to capture liquid fuel vapors at or near floor level. To minimize the potential for ignition in the event of a spill, receptacles, electrical fixtures, and hot-work operations, such as welding, are located outside of these areas. Compressed natural gas (CNG) is composed of methane with slight amounts of heavier simple hydrocarbons. Maintenance facilities that maintain CNG vehicles indoors must be protected against fire and explosion. However, the means of ensuring safety are different from those employed for liquid fuels because of the gaseous nature of methane and the fact that it is lighter than air. Because CNG is lighter than air, a release will rise to the ceiling of the maintenance facility and quickly dissipate rather than remaining at or near floor level like liquid fuel vapors. Although some of the means of protection for CNG vehicle maintenance facilities are similar to those used for liquid-fueled vehicles (ventilation and elimination of ignition sources), the types and placement of the protection equipment are different because of the behavior of the different fuels. The nature of gaseous methane may also require additional safeguards, such as combustible gas detectors and control systems, or specialized space heating, which are not needed in facilities servicing liquid-fuel vehicles. This handbook covers maintenance facilities that service CNG-fueled vehicles. Although similar requirements are mandated for liquefied natural gas (LNG) or liquefied petroleum gas (LPG) fueled vehicles, LNG and LPG are not covered in this handbook.« less

  5. Medicare and Medicaid programs; fire safety requirements for certain health care facilities. Final rule.

    PubMed

    2003-01-10

    This final rule amends the fire safety standards for hospitals, long-term care facilities, intermediate care facilities for the mentally retarded, ambulatory surgery centers, hospices that provide inpatient services, religious nonmedical health care institutions, critical access hospitals, and Programs of All-Inclusive Care for the Elderly facilities. Further, this final rule adopts the 2000 edition of the Life Safety Code and eliminates references in our regulations to all earlier editions.

  6. Lewis Research Center's coal-fired, pressurized, fluidized-bed reactor test facility

    NASA Astrophysics Data System (ADS)

    Kobak, J. A.; Rollbuhler, R. J.

    1981-10-01

    A 200-kilowatt-thermal, pressurized, fluidized-bed (PFB) reactor, research test facility was designed, constructed, and operated as part of a NASA-funded project to assess and evaluate the effect of PFB hot-gas effluent on aircraft turbine engine materials that might have applications in stationary-power-plant turbogenerators. Some of the techniques and components developed for this PFB system are described. One of the more important items was the development of a two-in-one, gas-solids separator that removed 95+ percent of the solids in 1600 F to 1900 F gases. Another was a coal and sorbent feed and mixing system for injecting the fuel into the pressurized combustor. Also important were the controls and data-acquisition systems that enabled one person to operate the entire facility. The solid, liquid, and gas sub-systems all had problems that were solved over the 2-year operating time of the facility, which culminated in a 400-hour, hot-gas, turbine test.

  7. Lewis Research Center's coal-fired, pressurized, fluidized-bed reactor test facility

    NASA Technical Reports Server (NTRS)

    Kobak, J. A.; Rollbuhler, R. J.

    1981-01-01

    A 200-kilowatt-thermal, pressurized, fluidized-bed (PFB) reactor, research test facility was designed, constructed, and operated as part of a NASA-funded project to assess and evaluate the effect of PFB hot-gas effluent on aircraft turbine engine materials that might have applications in stationary-power-plant turbogenerators. Some of the techniques and components developed for this PFB system are described. One of the more important items was the development of a two-in-one, gas-solids separator that removed 95+ percent of the solids in 1600 F to 1900 F gases. Another was a coal and sorbent feed and mixing system for injecting the fuel into the pressurized combustor. Also important were the controls and data-acquisition systems that enabled one person to operate the entire facility. The solid, liquid, and gas sub-systems all had problems that were solved over the 2-year operating time of the facility, which culminated in a 400-hour, hot-gas, turbine test.

  8. Unified Facilities Criteria (UFC) Design: Fire Protection Engineering for Facilities

    DTIC Science & Technology

    2003-08-20

    following provisions: • Ceiling sprinkler design area must be increased by 10 percent. ESFR sprinklers must increase the required number to be...Control System ESFR Early Suppression Fast-Response Sprinklers ETL Engineering Technical Letters FAAA Fire Administration Authorization Act FM

  9. Research Summary Multipollutant Control Research Facility (MPCRF)

    EPA Science Inventory

    The U.S. Environmental Protection Agency’s (EPA) Multipollutant Control Research Facility (MPCRF) is located at their Research Triangle Park, North Carolina, campus. The MPCRF combustor is a pulverized coal-, natural gas-, and biomass-fired furnace with a maximum firing rate of 4...

  10. Fire safety design of a mobile quarantine facility

    NASA Technical Reports Server (NTRS)

    Bass, R. S.; Hirasaki, J. K.

    1971-01-01

    During the design phase of the Mobile Quarantine Facility (MQF), a primary consideration was fire safety. Therefore, appropriate criteria and ground rules were used in the design and construction of the facility. The fire codes and fire-requirement listings that are used by commerical airlines were supplied to the Manned Spacecraft Center (MSC) by the Federal Aviation Agency (FAA). After these codes were reviewed, a basic ground rule was adopted that flame protection for all combustible materials should be at least equivalent to or better than the standards for commercial aircraft. Because the MQF was designed to operate with an interior atmosphere of air rather than with an oxygen-enriched atmosphere such as that of the Apollo spacecraft cabin, the requirements for MQF material were not as stringent as those for the spacecraft.

  11. Thermionic system evaluated test (TSET) facility description

    NASA Astrophysics Data System (ADS)

    Fairchild, Jerry F.; Koonmen, James P.; Thome, Frank V.

    1992-01-01

    A consortium of US agencies are involved in the Thermionic System Evaluation Test (TSET) which is being supported by the Strategic Defense Initiative Organization (SDIO). The project is a ground test of an unfueled Soviet TOPAZ-II in-core thermionic space reactor powered by electrical heat. It is part of the United States' national thermionic space nuclear power program. It will be tested in Albuquerque, New Mexico at the New Mexico Engineering Research Institute complex by the Phillips Laboratoty, Sandia National Laboratories, Los Alamos National Laboratory, and the University of New Mexico. One of TSET's many objectives is to demonstrate that the US can operate and test a complete space nuclear power system, in the electrical heater configuration, at a low cost. Great efforts have been made to help reduce facility costs during the first phase of this project. These costs include structural, mechanical, and electrical modifications to the existing facility as well as the installation of additional emergency systems to mitigate the effects of utility power losses and alkali metal fires.

  12. Morpheus: Advancing Technologies for Human Exploration

    NASA Technical Reports Server (NTRS)

    Olansen, Jon B.; Munday, Stephen R.; Mitchell, Jennifer D.; Baine, Michael

    2012-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing. Designed to serve as a vertical testbed (VTB) for advanced spacecraft technologies, the vehicle provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. This allows individual technologies to mature into capabilities that can be incorporated into human exploration missions. The Morpheus vehicle is propelled by a LOX/Methane engine and sized to carry a payload of 1100 lb to the lunar surface. In addition to VTB vehicles, the Project s major elements include ground support systems and an operations facility. Initial testing will demonstrate technologies used to perform autonomous hazard avoidance and precision landing on a lunar or other planetary surface. The Morpheus vehicle successfully performed a set of integrated vehicle test flights including hot-fire and tethered hover tests, leading up to un-tethered free-flights. The initial phase of this development and testing campaign is being conducted on-site at the Johnson Space Center (JSC), with the first fully integrated vehicle firing its engine less than one year after project initiation. Designed, developed, manufactured and operated in-house by engineers at JSC, the Morpheus Project represents an unprecedented departure from recent NASA programs that traditionally require longer, more expensive development lifecycles and testing at remote, dedicated testing facilities. Morpheus testing includes three major types of integrated tests. A hot-fire (HF) is a static vehicle test of the LOX/Methane propulsion system. Tether tests (TT) have the vehicle suspended above the ground using a crane, which allows testing of the propulsion and integrated Guidance, Navigation, and Control (GN&C) in hovering flight without the risk of a vehicle departure or crash. Morpheus free-flights (FF) test the complete Morpheus system without the additional safeguards provided during tether. A variety of free-flight trajectories are planned to incrementally build up to a fully functional Morpheus lander capable of flying planetary landing trajectories. In FY12, these tests will culminate with autonomous flights simulating a 1 km lunar approach trajectory, hazard avoidance maneuvers and precision landing in a prepared hazard field at the Kennedy Space Center (KSC). This paper describes Morpheus integrated testing campaign, infrastructure, and facilities, and the payloads being incorporated on the vehicle. The Project s fast pace, rapid prototyping, frequent testing, and lessons learned depart from traditional engineering development at JSC. The Morpheus team employs lean, agile development with a guiding belief that technologies offer promise, but capabilities offer solutions, achievable without astronomical costs and timelines.

  13. Nano-fibrillated cellulose-hydroxyapatite based composite foams with excellent fire resistance.

    PubMed

    Guo, Wenwen; Wang, Xin; Zhang, Ping; Liu, Jiajia; Song, Lei; Hu, Yuan

    2018-09-01

    Thermally insulating materials made from renewable resources are desirable for energy efficient buildings. Traditional petroleum-derived insulating materials such as rigid polyurethane foam and expanded polystyrene display poor flame retardancy and inorganic insulating materials such as silica aerogel are fragile. Herein, we reported a facile approach to prepare cellulose nanofiber (CNF)-hydroxyapatite (HAP) composite foam by a simple freeze-drying process. The resultant HAP-CNF composite foams showed a thermal conductivity in the range of 38.5-39.1 mW/(m K) and very low peak heat release rate (20.4 kW/m 2 ) and total heat release (1.21 MJ/m 2 ). Vertical burning tests also manifested excellent fire resistance and self-extinguishing behaviours. Considering the excellent fire resistance of this composite foam, it is of significance to fire safety solution for buildings insulating materials. Copyright © 2018 Elsevier Ltd. All rights reserved.

  14. Second Stage (S-II) Arrives at Marshall Space Flight Center For Testing

    NASA Technical Reports Server (NTRS)

    2004-01-01

    The business end of a Second Stage (S-II) slowly emerges from the shipping container as workers prepare to transport the Saturn V component to the testing facility at MSFC. The Second Stage (S-II) underwent vibration and engine firing tests. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  15. Vibration testing of the JE-M-604-4-IUE rocket motor (Thiokol P/N E 28639-03)

    NASA Technical Reports Server (NTRS)

    Alt, R. E.; Tosh, J. T.

    1976-01-01

    The NASA International Ultraviolet Explorer (IUE) rocket motor (TE-M-604-4), a solid fuel, spherical rocket motor, was vibration tested in the Impact, Vibration, and Acceleration (IVA) Test Unit of the von Karman Gas Dynamics Facility (VKF). The objective of the test program was to subject the motor to qualification levels of sinusoidal and random vibration prior to the altitude firing of the motor in the Propulsion Development Test Cell (T-3), Engine Test Facility (ETF), AEDC. The vibration testing consisted of a low level sine survey from 5 to 2,000 Hz, followed by a qualification level sine sweep and qualification level random vibration. A second low level sine survey followed the qualification level testing. This sequence of testing was accomplished in each of three orthogonal axes. No motor problems were observed due to the imposition of these dynamic environments.

  16. View looking north west showing the boom, top of the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View looking north west showing the boom, top of the center mast and boom angle reeving of the 175-ton derrick. Note in the background of the view, just above the center mast is the F-1 Static-Test Stand used for test firing the Saturn V engines and subsequent program's engine testing. Also in the background center is the Redstone Static Test Stand (center right) and it's cold calibration tower (center left). - Marshall Space Flight Center, Saturn V Dynamic Test Facility, East Test Area, Huntsville, Madison County, AL

  17. Rocket nozzle thermal shock tests in an arc heater facility

    NASA Technical Reports Server (NTRS)

    Painter, James H.; Williamson, Ronald A.

    1986-01-01

    A rocket motor nozzle thermal structural test technique that utilizes arc heated nitrogen to simulate a motor burn was developed. The technique was used to test four heavily instrumented full-scale Star 48 rocket motor 2D carbon/carbon segments at conditions simulating the predicted thermal-structural environment. All four nozzles survived the tests without catastrophic or other structural failures. The test technique demonstrated promise as a low cost, controllable alternative to rocket motor firing. The technique includes the capability of rapid termination in the event of failure, allowing post-test analysis.

  18. 42 CFR 403.744 - Condition of participation: Life safety from fire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... written fire control plans that contain provisions for prompt reporting of fires; extinguishing fires...) The RNHCI must maintain written evidence of regular inspection and approval by State or local fire... contrary, the RNHCI may place alcohol-based hand rub dispensers in its facility if— (i) Use of alcohol...

  19. 36 CFR 331.15 - Fires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Fires. 331.15 Section 331.15... INDIANA § 331.15 Fires. Open fires are prohibited unless confined to fireplaces, grills, or other facilities designed for this purpose as designated by the District Engineer. Fires shall not be left...

  20. Fire Safety. Managing School Facilities, Guide 6.

    ERIC Educational Resources Information Center

    Department for Education and Employment, London (England). Architects and Building Branch.

    This booklet discusses how United Kingdom schools can manage fire safety and minimize the risk of fire. The guide examines what legislation school buildings must comply with and covers the major risks. It also describes training and evacuation procedures and provides guidance on fire precautions, alarm systems, fire fighting equipment, and escape…

  1. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1990-12-01

    The purpose of this report is to provide the status of a multi-task research and development program in coal fired MHD/steam combined cycle power production (more detailed information on specific topics is presented in topical reports). Current emphasis is on developing technology for the Steam Bottoming Cycle Program. The approach being taken is to design test components that simulate the most important process variables, such as gas temperature, chemical composition, tube metal temperature, particulate loading, etc., to gain test data needed for scale-up to larger size components. This quarter, a 217 hour coal-fired long-duration test was completed as part of the Proof-of-Concept (POC) test program. The aggregate test time is now 1512 hours of a planned 2000 hours on Eastern coal. The report contains results of testing the newly installed automatic ash/seed handling system and the high pressure sootblower system. The conceptual design for the modifications to the coal processing system to permit operation with Western coal is presented. Results of analysis of superheater test module tube removed after 500 hours of coal-fired testing are summarized. The status of the environmental program is reported. Pollutant measurements from remote monitoring trailers that give the dispersion of stack emissions are presented. Results of advanced measurement systems operated by both UTSI and Mississippi State University during the POC test are summarized. Actions to prepare for the installation of a 20MW(sub t) prototype of the TRW slag rejection combustor first stage are discussed. Contract management and administrative actions completed during the quarter are included.

  2. 75 FR 39664 - Grant of Authority For Subzone Status Materials Science Technology, Inc. (Specialty Elastomers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... Status Materials Science Technology, Inc. (Specialty Elastomers and Fire Retardant Chemicals) Conroe... specialty elastomer manufacturing and distribution facility of Materials Science Technology, Inc., located... and distribution of specialty elastomers and fire retardant chemicals at the facility of Materials...

  3. Operations of cleanrooms during a forest fire including protocols and monitoring results

    NASA Astrophysics Data System (ADS)

    Matheson, Bruce A.; Egges, Joanne; Pirkey, Michael S.; Lobmeyer, Lynette D.

    2012-10-01

    Contamination-sensitive space flight hardware is typically built in cleanroom facilities in order to protect the hardware from particle contamination. Forest wildfires near the facilities greatly increase the number of particles and amount of vapors in the ambient outside air. Reasonable questions arise as to whether typical cleanroom facilities can adequately protect the hardware from these adverse environmental conditions. On Monday September 6, 2010 (Labor Day Holiday), a large wildfire ignited near the Boulder, Colorado Campus of Ball Aerospace. The fire was approximately 6 miles from the Boulder City limits. Smoke levels from the fire stayed very high in Boulder for the majority of the week after the fire began. Cleanroom operations were halted temporarily on contamination sensitive hardware, until particulate and non-volatile residue (NVR) sampling could be performed. Immediate monitoring showed little, if any effect on the cleanroom facilities, so programs were allowed to resume work while monitoring continued for several days and beyond in some cases. Little, if any, effect was ever noticed in the monitoring performed.

  4. Director, Operational Test and Evaluation FY 2005 Annual Report

    DTIC Science & Technology

    2005-12-01

    agent at room temperature, and moderate humidity in a specially-sealed chamber at Dugway Proving Ground , Utah. • The tolerance of the...Manned Ground Vehicles. The Army is conducting extensive NLOS-C developmental test firings at Yuma Proving Ground , Arizona. A detailed report on... agent , another would destroy ton containers of mustard blister agent ). After completion of a campaign, the facility will revert to OT status for

  5. Saturn Apollo Program

    NASA Image and Video Library

    2004-04-15

    The business end of a Second Stage (S-II) slowly emerges from the shipping container as workers prepare to transport the Saturn V component to the testing facility at MSFC. The Second Stage (S-II) underwent vibration and engine firing tests. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  6. From A-4 to Explorer 1. [U.S. rocket and missile technology historical review

    NASA Technical Reports Server (NTRS)

    Debus, K. H.

    1973-01-01

    Historical review of the development of rocket and missile technology in the United States over the period from 1945 to 1958. Attention is given to the organization of activities, the launch facilities, and the scope of test rocket firings at the White Sands Proving Ground area during the initial phase of research with captured German V2 rockets. The development of the Redstone missiles is outlined by discussing aspects of military involvement, cooperation with industrial suppliers, details of ground support equipment, and results of initial test firings. Subsequent development of the Jupiter missiles is examined in a similar manner, and attention is given to activities involved in the launching of the Explorer 1 satellite.

  7. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  8. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  9. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  10. 40 CFR 63.11648 - What are my notification, reporting, and recordkeeping requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility must submit the test data to EPA by entering the data electronically into EPA's WebFIRE data base... data into EPA's data base using the Electronic Reporting Tool or other compatible electronic..., monitoring data, and corrective actions required by §§ 63.11646 and 63.11647, and the information identified...

  11. Mechanic watches a General Electric I-40 Engine Fire

    NASA Image and Video Library

    1948-01-21

    A mechanic watches the firing of a General Electric I-40 turbojet at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The military selected General Electric’s West Lynn facility in 1941 to secretly replicate the centrifugal turbojet engine designed by British engineer Frank Whittle. General Electric’s first attempt, the I-A, was fraught with problems. The design was improved somewhat with the subsequent I-16 engine. It was not until the engine's next reincarnation as the I-40 in 1943 that General Electric’s efforts paid off. The 4000-pound thrust I-40 was incorporated into the Lockheed Shooting Star airframe and successfully flown in June 1944. The Shooting Star became the US’s first successful jet aircraft and the first US aircraft to reach 500 miles per hour. NACA Lewis studied all of General Electric’s centrifugal turbojet models during the 1940s. In 1945 the entire Shooting Star aircraft was investigated in the Altitude Wind Tunnel. Engine compressor performance and augmentation by water injection; comparison of different fuel blends in a single combustor; and air-cooled rotors were studied. The mechanic in this photograph watches the firing of a full-scale I-40 in the Jet Propulsion Static Laboratory. The facility was quickly built in 1943 specifically in order to test the early General Electric turbojets. The I-A was secretly analyzed in the facility during the fall of 1943.

  12. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    This photograph shows a test firing of the the Saturn V S-II (second) stage at the Mississippi Test Facility's (MTF) S-II test stand. When the Saturn V booster stage (S-IC) burns out and drops away, power for the Saturn will be provided by the 82-foot-long and 33-foot-diameter S-II stage. Developed by the Space Division of North American Aviation under the direction of the Marshall Space Flight Center, the stage utilized five J-2 engines, each producing 200,000 pounds of thrust. The engines used liquid oxygen and liquid hydrogen as propellants. Static test of ground test versions of the S-II stage were conducted at North American Aviation's Santa Susana, California test site. All flight stages were tested at the Mississippi Test Facility, Bay St. Louis, Mississippi. MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Sternis Space Center in May 1988.

  13. Saturn Apollo Program

    NASA Image and Video Library

    1967-01-01

    This photograph shows a test firing of the the Saturn V S-II (second) stage at the Mississippi Test Facility's (MTF) S-II test stand. When the Saturn V booster stage (S-IC) burns out and drops away, power for the Saturn will be provided by the 82-foot-long and 33-foot-diameter S-II stage. Developed by the Space Division of North American Aviation under the direction of the Marshall Space Flight Center, the stage utilized five J-2 engines, each producing 200,000 pounds of thrust. The engine used liquid oxygen and liquid hydrogen as its propellants. Static test of ground test versions of the S-II stage were conducted at North American Aviation's Santa Susana, California test site. All flight stages were tested at the Mississippi Test Facility, Bay St. Louis, Mississippi. The MTF was renamed to the National Space Technology Laboratory (NSTL) in 1974 and later to the Sternis Space Center (SSC) in May 1988.

  14. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Additional safety equipment... Pipeline Components § 192.171 Compressor stations: Additional safety equipment. (a) Each compressor station must have adequate fire protection facilities. If fire pumps are a part of these facilities, their...

  15. LAFD: TA-15 DARHT Firefighter Facility Familiarization Tour, OJT 53044, Revision 0.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutherford, Victor Stephen; Priestley, Terry B.; Maestas, Marvin Manuel

    The Los Alamos National Laboratory (LANL or the Lab) will conduct familiarization tours for the Los Alamos County Fire Department (LAFD) at the Dual-Axis Radiographic Hydrodynamic Test (DARHT) Facility, TA-15-0312. The purpose of these tours is to orient LAFD firefighters to the DARHT facility layout and hazards. This document provides information and figures to supplement the familiarization tours. The document will be distributed to the trainees at the time of the familiarization tour. A checklist (Attachment A) has also been developed to ensure that all required information is consistently presented to LAFD personnel during the familiarization tours.

  16. 76 FR 10246 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... regulations and update the standards for VA approval of such facilities, including standards for fire safety... to ``RIN 2900-AN57--Updating Fire Safety [[Page 10247

  17. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  18. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  19. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  20. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  1. 29 CFR 1915.505 - Fire response.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... written standard operating procedures for each type of fire response at the employer's facility; (v) The... suppression operations established by written standard operating procedures for each particular type of fire...) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT Fire Protection in Shipyard Employment § 1915...

  2. Advanced Space Transportation Program (ASTP)

    NASA Image and Video Library

    1997-08-07

    This double exposure depicts Marshall Space Flight Center's (MSFC) Test Stand 116 hosting a 60K Bantam Fastrac thrust chamber assembly test. The lower right exposure shows the engine firing in the test stand while the center exposure reveals workers monitoring the test in the interior block house of the test facility. The thrust chamber assembly is only part of the Fastrac engine project to build a low-cost engine for the X-34, an alternate light-weight unmarned launch vehicle. Both the nozzle and the engine for Fastrac are being manufactured at MSFC.

  3. Updating fire safety standards. Final rule; affirmation.

    PubMed

    2011-11-16

    This document affirms as final, without changes, a provision included in a final rule with request for comments that amended the Department of Veterans Affairs (VA) regulations concerning community residential care facilities, contract facilities for certain outpatient and residential services, and State home facilities. That provision established a five-year period within which all covered buildings with nursing home facilities existing as of June 25, 2001, must conform to the automatic sprinkler requirement of the 2009 edition of the National Fire Protection Association (NFPA) 101. This rule helps ensure the safety of veterans in the affected facilities.

  4. United States Advanced Ultra-Supercritical Component Test Facility for 760°C Steam Power Plants ComTest Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hack, Horst; Purgert, Robert Michael

    Following the successful completion of a 15-year effort to develop and test materials that would allow coal-fired power plants to be operated at advanced ultra-supercritical (A-USC) steam conditions, a United States-based consortium is presently engaged in a project to build an A-USC component test facility (ComTest). A-USC steam cycles have the potential to improve cycle efficiency, reduce fuel costs, and reduce greenhouse gas emissions. Current development and demonstration efforts are focused on enabling the construction of A-USC plants, operating with steam temperatures as high as 1400°F (760°C) and steam pressures up to 5000 psi (35 MPa), which can potentially increasemore » cycle efficiencies to 47% HHV (higher heating value), or approximately 50% LHV (lower heating value), and reduce CO 2 emissions by roughly 25%, compared to today’s U.S. fleet. A-USC technology provides a lower-cost method to reduce CO 2 emissions, compared to CO 2 capture technologies, while retaining a viable coal option for owners of coal generation assets. Among the goals of the ComTest facility are to validate that components made from advanced nickel-based alloys can operate and perform under A-USC conditions, to accelerate the development of a U.S.-based supply chain for the full complement of A-USC components, and to decrease the uncertainty of cost estimates for future A-USC power plants. The configuration of the ComTest facility would include the key A-USC technology components that were identified for expanded operational testing, including a gas-fired superheater, high-temperature steam piping, steam turbine valve, and cycling header component. Membrane walls in the superheater have been designed to operate at the full temperatures expected in a commercial A-USC boiler, but at a lower (intermediate) operating pressure. This superheater has been designed to increase the temperature of the steam supplied by the host utility boiler up to 1400°F (760°C). The steam turbine stop and control valve component has been designed to operate at full A-USC temperatures, and would be tested both in throttling operation and to accumulate accelerated, repetitive stroke cycles. A cycling header component has been designed to confirm the suitability of new high-temperature nickel alloys to cycling operation, expected of future coal-fired power plants. Current test plans would subject these components to A-USC operating conditions for at least 8,000 hours by September 2020. The ComTest project is managed by Energy Industries of Ohio, and technically directed by the Electric Power Research Institute, Inc., with General Electric designing the A-USC components. This consortium is completing the Detailed Engineering phase of the project, with procurement scheduled to begin in late 2017. The effort is primarily funded by the U.S. Department of Energy, through the National Energy Technology Laboratory, along with the Ohio Development Services Agency. This presentation outlines the motivation for the project, explains the project’s structure and schedule, and provides technical details on the design of the ComTest facility.« less

  5. Evaluation of Aqua-Ammonia Chiller Technologies and Field Site Installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zaltash, Abdolreza

    2007-09-01

    The Naval Facilities Engineering Service Center (NFESC) has sponsored Oak Ridge National Laboratory (ORNL) to review, select, and evaluate advanced, gas-fired, 5-ton, aqua-ammonia, chiller technologies. The selection criteria was that units have COP values of 0.67 or better at Air-conditioning and Refrigeration Institute (ARI) 95 F outdoor rating conditions, an active refrigerant flow control, and a variable-speed condenser fan. These features are expected to allow these units to operate at higher ambient temperatures (up to the maximum operating temperature of 110 F) with minimal degradation in performance. ORNL evaluated three potential manufacturers of advanced, gas-fired, 5-ton, aqua-ammonia chillers-Robur, Ambian, andmore » Cooling Technologies. Unfortunately, Robur did not meet the COP requirements and Cooling Technologies could not deliver a unit to be tested at the U.S. Department of Energy (DOE)-ORNL environmental chamber testing facility for thermally activated heat pumps. This eliminated these two technologies from further consideration, leaving only the Ambian chillers for evaluation. Two Ambian chillers were evaluated at the DOE-ORNL test facility. Overall these chillers operated well over a wide range of ambient conditions with minimal degradation in performance due to several control strategies used such as a variable speed condenser fan, a modulating burner, and active refrigerant flow control. These Ambian pre-commercial units were selected for installation and field testing at three federal facilities. NFESC worked with ORNL to assist with the site selection for installation and evaluation of these chillers. Two sites (ORNL and Naval Surface Warfare Center [NSWC] Corona) had a single chiller unit installed; and at one site (Naval Amphibious Base [NAB] Little Creek), two 5-ton chillers linked together were installed to provide 10 tons of cooling. A chiller link controller developed under this project was evaluated in the field test at Little Creek.« less

  6. 49 CFR 192.171 - Compressor stations: Additional safety equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Design of... must have adequate fire protection facilities. If fire pumps are a part of these facilities, their... event of inadequate cooling or lubrication of the unit. (d) Each compressor station gas engine that...

  7. 10 CFR 503.25 - Public interest.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... OF ENERGY (CONTINUED) ALTERNATE FUELS NEW FACILITIES Temporary Exemptions for New Facilities § 503.25..., during the construction of an alternate-fuel fired unit, the petitioner may substitute, in lieu of the... during the construction of an alternate fuel fired unit to be owned or operated by the petitioner; and (2...

  8. Fluids and Combustion Facility: Combustion Integrated Rack Modal Model Correlation

    NASA Technical Reports Server (NTRS)

    McNelis, Mark E.; Suarez, Vicente J.; Sullivan, Timothy L.; Otten, Kim D.; Akers, James C.

    2005-01-01

    The Fluids and Combustion Facility (FCF) is a modular, multi-user, two-rack facility dedicated to combustion and fluids science in the US Laboratory Destiny on the International Space Station. FCF is a permanent facility that is capable of accommodating up to ten combustion and fluid science investigations per year. FCF research in combustion and fluid science supports NASA's Exploration of Space Initiative for on-orbit fire suppression, fire safety, and space system fluids management. The Combustion Integrated Rack (CIR) is one of two racks in the FCF. The CIR major structural elements include the International Standard Payload Rack (ISPR), Experiment Assembly (optics bench and combustion chamber), Air Thermal Control Unit (ATCU), Rack Door, and Lower Structure Assembly (Input/Output Processor and Electrical Power Control Unit). The load path through the rack structure is outlined. The CIR modal survey was conducted to validate the load path predicted by the CIR finite element model (FEM). The modal survey is done by experimentally measuring the CIR frequencies and mode shapes. The CIR model was test correlated by updating the model to represent the test mode shapes. The correlated CIR model delivery is required by NASA JSC at Launch-10.5 months. The test correlated CIR flight FEM is analytically integrated into the Shuttle for a coupled loads analysis of the launch configuration. The analysis frequency range of interest is 0-50 Hz. A coupled loads analysis is the analytical integration of the Shuttle with its cargo element, the Mini Payload Logistics Module (MPLM), in the Shuttle cargo bay. For each Shuttle launch configuration, a verification coupled loads analysis is performed to determine the loads in the cargo bay as part of the structural certification process.

  9. Plume Particle Collection and Sizing from Static Firing of Solid Rocket Motors

    NASA Technical Reports Server (NTRS)

    Sambamurthi, Jay K.

    1995-01-01

    Thermal radiation from the plume of any solid rocket motor, containing aluminum as one of the propellant ingredients, is mainly from the microscopic, hot aluminum oxide particles in the plume. The plume radiation to the base components of the flight vehicle is primarily determined by the plume flowfield properties, the size distribution of the plume particles, and their optical properties. The optimum design of a vehicle base thermal protection system is dependent on the ability to accurately predict this intense thermal radiation using validated theoretical models. This article describes a successful effort to collect reasonably clean plume particle samples from the static firing of the flight simulation motor (FSM-4) on March 10, 1994 at the T-24 test bed at the Thiokol space operations facility as well as three 18.3% scaled MNASA motors tested at NASA/MSFC. Prior attempts to collect plume particles from the full-scale motor firings have been unsuccessful due to the extremely hostile thermal and acoustic environment in the vicinity of the motor nozzle.

  10. Producing fired bricks using coal slag from a gasification plant in indiana

    USGS Publications Warehouse

    Chen, L.-M.; Chou, I.-Ming; Chou, S.-F.J.; Stucki, J.W.

    2009-01-01

    Integrated gasification combined cycle (IGCC) is a promising power generation technology which increases the efficiency of coal-to-power conversion and enhances carbon dioxide concentration in exhaust emissions for better greenhouse gas capture. Two major byproducts from IGCC plants are bottom slag and sulfur. The sulfur can be processed into commercially viable products, but high value applications need to be developed for the slag material in order to improve economics of the process. The purpose of this study was to evaluate the technical feasibility of incorporating coal slag generated by the Wabash River IGCC plant in Indiana as a raw material for the production of fired bricks. Full-size bricks containing up to 20 wt% of the coal slag were successfully produced at a bench-scale facility. These bricks have color and texture similar to those of regular fired bricks and their water absorption properties met the ASTM specifications for a severe weathering grade. Other engineering properties tests, including compressive strength tests, are in progress.

  11. NASA Conducts First RS-25 Rocket Engine Test of 2015

    NASA Image and Video Library

    2015-01-09

    From the Press Release: The new year is off to a hot start for NASA's Space Launch System (SLS). The engine that will drive America's next great rocket to deep space blazed through its first successful test Jan. 9 at the agency's Stennis Space Center near Bay St. Louis, Mississippi. The RS-25, formerly the space shuttle main engine, fired up for 500 seconds on the A-1 test stand at Stennis, providing NASA engineers critical data on the engine controller unit and inlet pressure conditions. This is the first hot fire of an RS-25 engine since the end of space shuttle main engine testing in 2009. Four RS-25 engines will power SLS on future missions, including to an asteroid and Mars. "We’ve made modifications to the RS-25 to meet SLS specifications and will analyze and test a variety of conditions during the hot fire series,” said Steve Wofford, manager of the SLS Liquid Engines Office at NASA's Marshall Space Flight Center in Huntsville, Alabama, where the SLS Program is managed. "The engines for SLS will encounter colder liquid oxygen temperatures than shuttle; greater inlet pressure due to the taller core stage liquid oxygen tank and higher vehicle acceleration; and more nozzle heating due to the four-engine configuration and their position in-plane with the SLS booster exhaust nozzles.” The engine controller unit, the "brain" of the engine, allows communication between the vehicle and the engine, relaying commands to the engine and transmitting data back to the vehicle. The controller also provides closed-loop management of the engine by regulating the thrust and fuel mixture ratio while monitoring the engine's health and status. The new controller will use updated hardware and software configured to operate with the new SLS avionics architecture. "This first hot-fire test of the RS-25 engine represents a significant effort on behalf of Stennis Space Center’s A-1 test team," said Ronald Rigney, RS-25 project manager at Stennis. "Our technicians and engineers have been working diligently to design, modify and activate an extremely complex and capable facility in support of RS-25 engine testing." Testing will resume in April after upgrades are completed on the high pressure industrial water system, which provides cool water for the test facility during a hot fire test. Eight tests, totaling 3,500 seconds, are planned for the current development engine. Another development engine later will undergo 10 tests, totaling 4,500 seconds. The second test series includes the first test of new flight controllers, known as green running. The first flight test of the SLS will feature a configuration for a 70-metric-ton (77-ton) lift capacity and carry an uncrewed Orion spacecraft beyond low-Earth orbit to test the performance of the integrated system. As the SLS is upgraded, it will provide an unprecedented lift capability of 130 metric tons (143 tons) to enable missions even farther into our solar system.

  12. Survivability Tests on a Nuclear Waste Cask in Simulated Railroad Accident Fires.

    DTIC Science & Technology

    1983-06-01

    Axial Reference Point ( XRP ) .......... 19 4. A View of the Torch Facility with the Nozzle Directed Side-On to the HNPF Cask... XRP and the TIC for Various HNPF Cask Surfaces in Test Number 1 .................... 47 16. The Spatial Distribution of Sensors in a Cross-Sectional...Plane Through the HNPF Cask at 289.6 cm from the XRP as Viewed from the Top End with the TIC Located at 900 for Test Numbers 1 and 2

  13. Saturn Apollo Program

    NASA Image and Video Library

    1967-10-01

    S-IB-211, the flight version of the Saturn IB launch vehicle's first (S-IVB) stage, arrives at Marshall Space Flight Center's (MSFC's) S-IB static test stand. Between December 1967 and April 1968, the stage would undergo seven static test firings. The S-IB, developed by the MSFC and built by the Chrysler Corporation at the Michoud Assembly Facility near New Orleans, Louisiana, utilized eight H-1 engines and each produced 200,000 pounds of thrust.

  14. Saturn Apollo Program

    NASA Image and Video Library

    1967-10-01

    S-IB-211, the flight version of the Saturn IB launch vehicle's first (S-IVB) stage, on its way to Marshall Space Flight Center's (MSFC's) west test area. Between December 1967 and April 1968, the stage would undergo seven static test firings. The S-IB, developed by the MSFC and built by the Chrysler Corporation at the Michoud Assembly Facility near New Orleans, Louisiana, utilized eight H-1 engines and each produced 200,000 pounds of thrust.

  15. Saturn Apollo Program

    NASA Image and Video Library

    1967-10-01

    S-IB-211, the flight version of the Saturn IB launch vehicle's (S-IVB) first stage, after installation at the Marshall Space Flight Center's (MSFC's) S-IB static test stand. Between December 1967 and April 1968, the stage would undergo seven static test firings. The S-IB, developed by the MSFC and built by the Chrysler Corporation at the Michoud Assembly Facility near New Orleans, Louisiana, utilized eight H-1 engines and each produced 200,000 pounds of thrust.

  16. Preventing Fire Death and Injury, Conducting a Fire Drill in a Group Home [and] When You Need a Fire Safety Expert. National Fire Safety Certification System. Continuing Education Program. Volume 1, Numbers 1-3.

    ERIC Educational Resources Information Center

    Walker, Bonnie

    Three booklets provide fire safety information for staff of residential facilities serving people with developmental disabilities. Booklets focus on: (1) preventing fire death and injury, (2) conducting a fire drill in a group home, and (3) the role of fire safety experts. The first booklet stresses the elimination of the following dangers:…

  17. Control Room at the NACA’s Rocket Engine Test Facility

    NASA Image and Video Library

    1957-05-21

    Test engineers monitor an engine firing from the control room of the Rocket Engine Test Facility at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The Rocket Engine Test Facility, built in the early 1950s, had a rocket stand designed to evaluate high-energy propellants and rocket engine designs. The facility was used to study numerous different types of rocket engines including the Pratt and Whitney RL-10 engine for the Centaur rocket and Rocketdyne’s F-1 and J-2 engines for the Saturn rockets. The Rocket Engine Test Facility was built in a ravine at the far end of the laboratory because of its use of the dangerous propellants such as liquid hydrogen and liquid fluorine. The control room was located in a building 1,600 feet north of the test stand to protect the engineers running the tests. The main control and instrument consoles were centrally located in the control room and surrounded by boards controlling and monitoring the major valves, pumps, motors, and actuators. A camera system at the test stand allowed the operators to view the tests, but the researchers were reliant on data recording equipment, sensors, and other devices to provide test data. The facility’s control room was upgraded several times over the years. Programmable logic controllers replaced the electro-mechanical control devices. The new controllers were programed to operate the valves and actuators controlling the fuel, oxidant, and ignition sequence according to a predetermined time schedule.

  18. Natural convection flows and associated heat transfer processes in room fires

    NASA Astrophysics Data System (ADS)

    Sargent, William Stapf

    This report presents the results of experimental investigations of natural convection flows and associated heat transfer processes produced by small fires in rooms with a single door or window opening. Calculation procedures have been developed to model the major aspects of these flows.Two distinct sets of experiments were undertaken.First, in a roughly 1/4 scale facility, a slightly dense solution of brine was allowed to flow into a tank of fresh water. The resulting density difference produced a flow which simulated a very small fire in a room with adiabatic walls. Second, in an approximately 1/2 scale test room, a nearly stoichioinetric mixture of air and natural gas was burned at floor level to model moderate strength fires. In this latter facility, we directly measured the heat conducted through the walls, in addition to determining the gas temperature and composition throughout the room.These two facilities complemented each other. The former offered good flow visualization and allowed us to observe the basic flow phenomena in the absence of heat transfer effects. On the other hand, the latter, which involved relatively larger fires, was a more realistic simulation of an actual room fire, and allowed us to calculate the convective heat transfer to the ceiling and walls. In addition, the stronger sources present in these 1/2 scale tests produced significant secondary flows. These secondary flows along with heat transfer effects act to modify the gas temperature or density profiles within the room from those observed in the 1/4 scale experiments.Several calculation procedures have been developed, based on the far field properties of plumes when the density differences are small (the Boussinesq approximation). The simple point source plume solution is used along with hydraulic analysis of flow through an orifice to estimate the temperatures of the hot ceiling layer gas and of the cooler floor zone fluid, as well as the height of the interface between them. A finite source plume model is combined with conservation equations across the interface to compute the evolution of the plume above the interface. This calculation then provides the starting point for an integral analysis of the flow and heat transfer in the turbulent ceiling jet.The computed results both for the average floor and ceiling zone gas temperatures, and for the connective heat transfer in the ceiling jet agreed reasonably well with our experimental data. This agreement suggests that our computational procedures can be applied to answer practical questions, such as whether the connective heat flux from a given fire in a real room would be sufficient to trigger sprinklers or other detection systems in a given amount of time.

  19. LA-UR-14-27684, Analysis of Wildland Fire Hazard to the TWF at Los Alamos National Labs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilbertson, Sarah

    Wildfires represent an Anticipated Natural Phenomena Hazard for LANL and the surrounding area. The TWF facility is located in a cleared area and is surrounded on three sides by roadway pavement. Therefore, direct propagation of flames to the facility is not considered the most credible means of ignition. Rather, fires started by airborne transport of burning brands constitute the most significant wildland fire threat to the TWF. The purpose of this document is to update LA-UR-13-24529, Airborne Projection of Burning Embers – Planning and Controls for Los Alamos National Laboratory Facilities, to be specific to the TWF site and operations.

  20. Occupancy Fire Record: Schools.

    ERIC Educational Resources Information Center

    National Fire Protection Association, Boston, MA.

    The considerations of human safety and preservation of facilities are examined in relation to school fires. Various aspects of planning which would decrease the probability of fires and thereby save life and property are reviewed and include--(1) causes, (2) automatic protection devices, (3) evacuation and fire drills, and (4) construction…

  1. Feasibility of a small central cogenerated energy facility: Energy management memorandum

    NASA Astrophysics Data System (ADS)

    Porter, R. N.

    1982-10-01

    The thermal economic feasibility of a small cogenerated energy facility designed to serve several industries in the Stockyards area was investigated. Cogeneration options included two dual fuel diesels and two gas turbines, all with waste heat boilers, and five fired boilers. Fuels included natural gas, and for the fired boiler cases, also low sulphur coal and municipal refuse. For coal and refuse, the option of steam only without cogeneration was also assessed. The fired boiler cogeneration systems employed back pressure steam turbines. The refuse fired cases utilized electrical capacities, 8500 to 52,400 lbm/hr and 0 to 9.9 MW (e), respectively. Deficient steam was assumed generated independently in existing equipment. Excess electrical power over that which was displaced was sold to Commonwealth Edison Company under PURPA (Public Utility Regulatory Policies Act). The facility was operated by a mutually owned corporation formed by the cogenerated power users.

  2. Skylab Shroud in the Space Power Facility

    NASA Image and Video Library

    1970-12-21

    The 56-foot tall, 24,400-pound Skylab shroud installed in the Space Power Facility’s vacuum chamber at the National Aeronautics and Space Administration’s (NASA) Plum Brook Station. The Space Power Facility, which began operations in 1969, is the largest high vacuum chamber ever built. The chamber is 100 feet in diameter and 120 feet high. It can produce a vacuum deep enough to simulate the conditions at 300 miles altitude. The Space Power Facility was originally designed to test nuclear-power sources for spacecraft during long durations in a space atmosphere, but it was never used for that purpose. Payload shrouds are aerodynamic fairings to protect the payload during launch and ascent to orbit. The Skylab mission utilized the largest shroud ever attempted. Unlike previous launches, the shroud would not be jettisoned until the spacecraft reached orbit. NASA engineers designed these tests to verify the dynamics of the jettison motion in a simulated space environment. Fifty-four runs and three full-scale jettison tests were conducted from mid-September 1970 to June 1971. The shroud behaved as its designers intended, the detonators all fired, and early design issues were remedied by the final test. The Space Power Facility continues to operate today. The facility can sustain a high vacuum; simulate solar radiation via a 4-megawatt quartz heat lamp array, solar spectrum by a 400-kilowatt arc lamp, and cold environments. Test programs at the facility include high-energy experiments, shroud separation tests, Mars Lander system tests, deployable Solar Sail tests and International Space Station hardware tests.

  3. Ten Fire Safety Tips for Schools.

    ERIC Educational Resources Information Center

    Lake, James D.

    1999-01-01

    Provides 10 basic tips, compiled from the National Fire Protection Association's Life Safety Code 101, to ensure that educational facilities are fire safe. Tips include use of frequent and unexpected fire drills, limiting wall space of student artwork and teaching materials, being alert to preventing arson, planning speedy and safe emergency…

  4. 75 FR 17641 - Updating Fire Safety Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Parts 17 and 59 RIN 2900-AN57 Updating Fire Safety Standards... for VA approval of such facilities, including standards for fire safety and heating and cooling... submitted in response to ``RIN 2900-AN57--Updating Fire Safety Standards.'' Copies of comments received will...

  5. FIRE III ACE

    Atmospheric Science Data Center

    2013-01-23

    FIRE III ACE Data Sets The First International Satellite Cloud ... Regional Experiment (FIRE) - Arctic Cloud Experiment (ACE) was conducted April through July of 1998. It was held in conjunction with ... Heat Budget of the Arctic Ocean (SHEBA) Experiment. The FIRE-ACE focused on all aspects of Arctic cloud systems. The main facility was ...

  6. Laser detonator development for test-firing applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Munger, A. C.; Thomas, K. A.; Kennedy, J. E.

    2004-01-01

    Los Alamos National Laboratory has historically fielded two types of electro-explosive detonators. The exploding-bridgewire detonator (EBW) has an exploding wire as the initiating element, a low-density transfer charge and a high-density output pellet. The slapper detonator, or exploding-foil initiator (EFI), utilizes an exploding foil to drive a flying plate element into a high-density output pellet. The last twenty years has seen various research and development activities from many laboratories and manufacturing facilities around the world to develop laser-driven analogs of these devices, but to our knowledge none of those is in general use. Los Alamos is currently committed to designmore » and manufacture a laser analog to the long-standing, generic, general-purpose SE-1 EBW detonator, which is intended to provide increased safety in large-scale test-firing operations. This paper will discuss the major design parameters of this laser detonator and present some preliminary testing results.« less

  7. The Missoula Fire Sciences Laboratory: A 50-year dedication to understanding wildlands and fire

    Treesearch

    Diane M. Smith

    2012-01-01

    In 1960, the USDA Forest Service established the Northern Forest Fire Laboratory (now the Missoula Fire Sciences Laboratory) to find scientific solutions for better managing the nation's wildland resources and to research ways to improve forest fire prevention and suppression. This new state-of-the-art research facility did not emerge from a vacuum, however. This...

  8. Flow Friction or Spontaneous Ignition?

    NASA Technical Reports Server (NTRS)

    Stoltzfus, Joel M.; Gallus, Timothy D.; Sparks, Kyle

    2012-01-01

    "Flow friction," a proposed ignition mechanism in oxygen systems, has proved elusive in attempts at experimental verification. In this paper, the literature regarding flow friction is reviewed and the experimental verification attempts are briefly discussed. Another ignition mechanism, a form of spontaneous combustion, is proposed as an explanation for at least some of the fire events that have been attributed to flow friction in the literature. In addition, the results of a failure analysis performed at NASA Johnson Space Center White Sands Test Facility are presented, and the observations indicate that spontaneous combustion was the most likely cause of the fire in this 2000 psig (14 MPa) oxygen-enriched system.

  9. Large Scale Experiments on Spacecraft Fire Safety

    NASA Technical Reports Server (NTRS)

    Urban, David L.; Ruff, Gary A.; Minster, Olivier; Toth, Balazs; Fernandez-Pello, A. Carlos; T'ien, James S.; Torero, Jose L.; Cowlard, Adam J.; Legros, Guillaume; Eigenbrod, Christian; hide

    2012-01-01

    Full scale fire testing complemented by computer modelling has provided significant know how about the risk, prevention and suppression of fire in terrestrial systems (cars, ships, planes, buildings, mines, and tunnels). In comparison, no such testing has been carried out for manned spacecraft due to the complexity, cost and risk associated with operating a long duration fire safety experiment of a relevant size in microgravity. Therefore, there is currently a gap in knowledge of fire behaviour in spacecraft. The entire body of low-gravity fire research has either been conducted in short duration ground-based microgravity facilities or has been limited to very small fuel samples. Still, the work conducted to date has shown that fire behaviour in low-gravity is very different from that in normal-gravity, with differences observed for flammability limits, ignition delay, flame spread behaviour, flame colour and flame structure. As a result, the prediction of the behaviour of fires in reduced gravity is at present not validated. To address this gap in knowledge, a collaborative international project, Spacecraft Fire Safety, has been established with its cornerstone being the development of an experiment (Fire Safety 1) to be conducted on an ISS resupply vehicle, such as the Automated Transfer Vehicle (ATV) or Orbital Cygnus after it leaves the ISS and before it enters the atmosphere. A computer modelling effort will complement the experimental effort. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. This will facilitate the possibility of examining fire behaviour on a scale that is relevant to spacecraft fire safety and will provide unique data for fire model validation. This unprecedented opportunity will expand the understanding of the fundamentals of fire behaviour in spacecraft. The experiment is being developed by an international topical team that is collaboratively defining the experiment requirements and performing supporting analysis, experimentation and technology development. This paper presents the objectives, status and concept of this project.

  10. Large Scale Experiments on Spacecraft Fire Safety

    NASA Technical Reports Server (NTRS)

    Urban, David; Ruff, Gary A.; Minster, Olivier; Fernandez-Pello, A. Carlos; Tien, James S.; Torero, Jose L.; Legros, Guillaume; Eigenbrod, Christian; Smirnov, Nickolay; Fujita, Osamu; hide

    2012-01-01

    Full scale fire testing complemented by computer modelling has provided significant knowhow about the risk, prevention and suppression of fire in terrestrial systems (cars, ships, planes, buildings, mines, and tunnels). In comparison, no such testing has been carried out for manned spacecraft due to the complexity, cost and risk associated with operating a long duration fire safety experiment of a relevant size in microgravity. Therefore, there is currently a gap in knowledge of fire behaviour in spacecraft. The entire body of low-gravity fire research has either been conducted in short duration ground-based microgravity facilities or has been limited to very small fuel samples. Still, the work conducted to date has shown that fire behaviour in low-gravity is very different from that in normal gravity, with differences observed for flammability limits, ignition delay, flame spread behaviour, flame colour and flame structure. As a result, the prediction of the behaviour of fires in reduced gravity is at present not validated. To address this gap in knowledge, a collaborative international project, Spacecraft Fire Safety, has been established with its cornerstone being the development of an experiment (Fire Safety 1) to be conducted on an ISS resupply vehicle, such as the Automated Transfer Vehicle (ATV) or Orbital Cygnus after it leaves the ISS and before it enters the atmosphere. A computer modelling effort will complement the experimental effort. Although the experiment will need to meet rigorous safety requirements to ensure the carrier vehicle does not sustain damage, the absence of a crew removes the need for strict containment of combustion products. This will facilitate the possibility of examining fire behaviour on a scale that is relevant to spacecraft fire safety and will provide unique data for fire model validation. This unprecedented opportunity will expand the understanding of the fundamentals of fire behaviour in spacecraft. The experiment is being developed by an international topical team that is collaboratively defining the experiment requirements and performing supporting analysis, experimentation and technology development. This paper presents the objectives, status and concept of this project.

  11. FIRE III ACE Info

    Atmospheric Science Data Center

    2014-03-18

    ... Regional Experiment (FIRE) - Arctic Cloud Experiment (ACE) was conducted April through July of 1998. It was held in conjunction with ... Heat Budget of the Arctic Ocean (SHEBA) Experiment. The FIRE-ACE focused on all aspects of Arctic cloud systems. The main facility was ...

  12. A new sliding joint to accommodate recoil of a free-piston-driven expansion tube facility

    NASA Astrophysics Data System (ADS)

    Gildfind, D. E.; Morgan, R. G.

    2016-11-01

    This paper describes a new device to decouple free-piston driver recoil and its associated mechanical vibration from the acceleration tube and test section of The University of Queensland's X3 expansion tube. A sliding joint is introduced to the acceleration tube which axially decouples the facility at this station. When the facility is fired, the upstream section of the facility, which includes the free-piston driver, can recoil upstream freely. The downstream acceleration tube remains stationary. This arrangement provides two important benefits. Firstly, it eliminates nozzle movement relative to the test section before and during the experiment. This has benefits in terms of experimental setup and alignment. Secondly, it prevents transmission of mechanical disturbances from the free-piston driver to the acceleration tube, thereby eliminating mechanically-induced transducer noise in the sensitive pressure transducers installed in this low-pressure tube. This paper details the new design, and presents experimental confirmation of its performance.

  13. On the influences of key modelling constants of large eddy simulations for large-scale compartment fires predictions

    NASA Astrophysics Data System (ADS)

    Yuen, Anthony C. Y.; Yeoh, Guan H.; Timchenko, Victoria; Cheung, Sherman C. P.; Chan, Qing N.; Chen, Timothy

    2017-09-01

    An in-house large eddy simulation (LES) based fire field model has been developed for large-scale compartment fire simulations. The model incorporates four major components, including subgrid-scale turbulence, combustion, soot and radiation models which are fully coupled. It is designed to simulate the temporal and fluid dynamical effects of turbulent reaction flow for non-premixed diffusion flame. Parametric studies were performed based on a large-scale fire experiment carried out in a 39-m long test hall facility. Several turbulent Prandtl and Schmidt numbers ranging from 0.2 to 0.5, and Smagorinsky constants ranging from 0.18 to 0.23 were investigated. It was found that the temperature and flow field predictions were most accurate with turbulent Prandtl and Schmidt numbers of 0.3, respectively, and a Smagorinsky constant of 0.2 applied. In addition, by utilising a set of numerically verified key modelling parameters, the smoke filling process was successfully captured by the present LES model.

  14. Making fired bricks with spent equilibrium catalyst-a technical feasibility study

    USGS Publications Warehouse

    Chou, M.-L.; Chen, L.-M.; Lai, Y.-C.; Chou, S.-F.

    2009-01-01

    Fluid catalytic cracking in an oil refinery uses a catalyst, such as an alumino-silicate zeolite, in the conversion of heavy hydrocarbons to light hydrocarbons. A small fraction of the catalyst is continually replaced with fresh catalyst to maintain activity. In North America, more than 400 tons of spent alumino-silicate equilibrium catalyst (spent e-cat), and worldwide, more than 1,100 tons, are generated daily, most of which is disposed of in landfills (municipal and on-site facilities). In this study, three spent e-cat samples were tested in a value-added application that would utilize this waste in the manufacturing of fired bricks. The results of this study indicate that spent e-cat is a technically feasible raw material substitute for the clay and shale commonly used in fired brick production. Fired bricks produced with up to 30 wt% of spent e-cat showed good physical appearance and their water absorption properties met the ASTM C 62 specifications for building bricks of either the moderate-or severe-weathering grade.

  15. 33 CFR 127.615 - Fires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Fires. 127.615 Section 127.615... Facilities Handling Liquefied Natural Gas Firefighting § 127.615 Fires. In the marine transfer area for LNG, the operator shall ensure that there are no fires when there is LNG present. [CGD 78-038, 53 FR 3376...

  16. 75 FR 35437 - Notice of Request for Extension of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... from construction of a fire station with fire fighting and rescue equipment to financing a 911 emergency system. These facilities are designed to provide fire protection and emergency rescue services to... for a currently approved information collection in support of the program for Fire and Rescue Loans...

  17. KSC-91PC-0265

    NASA Image and Video Library

    1991-02-20

    Vice President of the United States Dan Quayle, right, tries on a communications headset in the Launch Control Center and learns about firing room activities from Launch Director Robert Sieck. Quayle spoke with members of the STS-39 flight crew participating in the Terminal Countdown Demonstration Test, toured the launch pad and other center facilities, addressed workers and held a press conference. Image credit: NASA

  18. Application of the NUREG/CR-6850 EPRI/NRC Fire PRA Methodology to a DOE Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tom Elicson; Bentley Harwood; Richard Yorg

    2011-03-01

    The application NUREG/CR-6850 EPRI/NRC fire PRA methodology to DOE facility presented several challenges. This paper documents the process and discusses several insights gained during development of the fire PRA. A brief review of the tasks performed is provided with particular focus on the following: • Tasks 5 and 14: Fire-induced risk model and fire risk quantification. A key lesson learned was to begin model development and quantification as early as possible in the project using screening values and simplified modeling if necessary. • Tasks 3 and 9: Fire PRA cable selection and detailed circuit failure analysis. In retrospect, it wouldmore » have been beneficial to perform the model development and quantification in 2 phases with detailed circuit analysis applied during phase 2. This would have allowed for development of a robust model and quantification earlier in the project and would have provided insights into where to focus the detailed circuit analysis efforts. • Tasks 8 and 11: Scoping fire modeling and detailed fire modeling. More focus should be placed on detailed fire modeling and less focus on scoping fire modeling. This was the approach taken for the fire PRA. • Task 14: Fire risk quantification. Typically, multiple safe shutdown (SSD) components fail during a given fire scenario. Therefore dependent failure analysis is critical to obtaining a meaningful fire risk quantification. Dependent failure analysis for the fire PRA presented several challenges which will be discussed in the full paper.« less

  19. Medicare and Medicaid Programs; Fire Safety Requirements for Certain Health Care Facilities. Final rule.

    PubMed

    2016-05-04

    This final rule will amend the fire safety standards for Medicare and Medicaid participating hospitals, critical access hospitals (CAHs), long-term care facilities, intermediate care facilities for individuals with intellectual disabilities (ICF-IID), ambulatory surgery centers (ASCs), hospices which provide inpatient services, religious non-medical health care institutions (RNHCIs), and programs of all-inclusive care for the elderly (PACE) facilities. Further, this final rule will adopt the 2012 edition of the Life Safety Code (LSC) and eliminate references in our regulations to all earlier editions of the Life Safety Code. It will also adopt the 2012 edition of the Health Care Facilities Code, with some exceptions.

  20. Compliance Testing of Grissom Air Force Base Central Heating Plant Coal- Fired Boilers 3, 4, and 5, Grissom Air Force Base, Indiana

    DTIC Science & Technology

    1992-06-01

    coal as classified ac- Department of Environmental Manage- be or, a wet basis and the following conver- cording to ASTM D388-88, "Standard ment...fifteen (15) minutes at the same Sec. 5. (a) Owners or operators of af- erifte p)iute at te me coal as classified according to ASTM fected facilities shall...representative of normal operations or conditions; under other capacities or conditions Testing and Materials ( ASTM ) proce- (B) additional tests to allow

  1. Navy Safety Center data on the effects of fire protection systems on electrical equipment

    NASA Astrophysics Data System (ADS)

    Levine, Robert S.

    1991-04-01

    Records of the Navy Safety Center, Norfolk, VA were reviewed to find data relevant to inadvertant operation of installed fire extinguishing systems in civilian nuclear power plants. Navy data show the incidence of collateral fire or other damage by fresh water on operating electrical equipment in submarines and in shore facilities is about the same as the civilian experience, about 30 percent. Aboard surface ships, however, the collateral damage incidence in much lower, about 15 percent. With sea water, the collateral damage incidence is at least 75 percent. It is concluded that the fire extinguisher water has to be contaminated, as by rust in sprinkler systems or deposited salt spray, for most collateral damage to occur. Reasons for inadvertant operation (or advertant operation) of firex systems at shore facilities, submarines, and surface ships resemble those for nuclear power plants. Mechanical or electrical failures lead the list, followed by mishaps during maintenance. Detector and alarm system failures are significant problems at Navy shore facilities, and significant at nuclear power plants. Fixed halon and CO2 systems in shore facilities cause no collateral damage. Lists of individual Navy incidents with water and with halon and carbon dioxide are included as appendices.

  2. THE EFFECTS OF COMPUTER-BASED FIRE SAFETY TRAINING ON THE KNOWLEDGE, ATTITUDES, AND PRACTICES OF CAREGIVERS

    PubMed Central

    Harrington, Susan S.; Walker, Bonnie L.

    2010-01-01

    Background Older adults in small residential board and care facilities are at a particularly high risk of fire death and injury because of their characteristics and environment. Methods The authors investigated computer-based instruction as a way to teach fire emergency planning to owners, operators, and staff of small residential board and care facilities. Participants (N = 59) were randomly assigned to a treatment or control group. Results Study participants who completed the training significantly improved their scores from pre- to posttest when compared to a control group. Participants indicated on the course evaluation that the computers were easy to use for training (97%) and that they would like to use computers for future training courses (97%). Conclusions This study demonstrates the potential for using interactive computer-based training as a viable alternative to instructor-led training to meet the fire safety training needs of owners, operators, and staff of small board and care facilities for the elderly. PMID:19263929

  3. Station set requirements document. Volume 82: Fire support. Book 2: Preliminary functional fire plan

    NASA Technical Reports Server (NTRS)

    Gray, N. C.

    1974-01-01

    The fire prevention/protection requirements for all shuttle facility and ground support equipment are presented for the hazardous operations. These include: preparing the orbiter for launch, launch operations, landing operations, safing operations, and associated off-line activities.

  4. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    NASA Ares I-X Launch Director Ed Mango monitors the launch countdown from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the planned launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  5. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X Launch Director Ed Mango, 3rd from left, along with other mission managers watches the launch of the Ares I-X rocket from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  6. An Opinion on the Nitrate Film Fire, Suitland, Maryland, 7 December 1978.

    ERIC Educational Resources Information Center

    Utterback, W. H., Jr.

    1980-01-01

    Examines the storage conditions and the circumstances surrounding the film storage facility fire in Suitland, Maryland, which destroyed over 13 million feet of film. Outlines possible causes for the fire and offers recommendations for prevention of such future disasters. (JMF)

  7. Green Monopropellant Status at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Burnside, Christopher G.; Pierce, Charles W.; Pedersen, Kevin W.

    2016-01-01

    NASA Marshall Space Flight Center is continuing investigations into the use of green monopropellants as a replacement for hydrazine in spacecraft propulsion systems. Work to date has been to push technology development through multiple activities designed to understand the capabilities of these technologies. Future work will begin to transition to mission pull as these technologies are mature while still keeping a solid goal of pushing technology development as opportunities become available. The AF-M315E activities began with hot-fire demonstration testing of a 1N monopropellant thruster in FY 14 and FY15. Following successful completion of the preliminary campaign, changes to the test stand to accommodate propellant conditioning capability and better control of propellant operations was incorporated to make testing more streamlined. The goal is to conduct hot-fire testing with warm and cold propellants using the existing feed system and original thruster design. Following the 1N testing, a NASA owned 100 mN thruster will be hot-fire tested in the same facility to show feasibility of scaling to smaller thrusters for cubesat applications. The end goal is to conduct a hot-fire test of an integrated cubesat propulsion system using an SLM printed propellant tank, an MSFC designed propulsion system electronic controller and the 100 mN thruster. In addition to the AF-M315E testing, MSFC is pursuing hot-fire testing with LMP-103S. Following our successful hot-fire testing of the 22N thruster in April 2015, a test campaign was proposed for a 440N LMP-103S thruster with Orbital ATK and Plasma Processes. This activity was funded through the Space Technology Mission Directorate (STMD) ACO funding call in the last quarter of CY15. Under the same funding source a test activity with Busek and Glenn Research Center for testing of 5N AF-M315E thrusters was proposed and awarded. Both activities are in-work with expected completion of hot-fire testing by the end of FY17. MSFC is continuing to coordinate with the AF and academia on understanding the chemical reactions that occur in AF-M315E. An on-going investigation of the catalyst bed species using Raman Spectroscopy through the NASA Technology Research Fellowship Program (NSTRF) is looking for ways to minimize the amount of computation required by understanding the intermediate species created in the catalyst bed. The MSFC team is also working with commercial partners through Cooperative Agreement Notices (CAN's). Partnerships with commercial and academia include work in non-catalytic ignition of AF-M315, spark ignition of hybrid cubesat systems, printed SLM tanks, and dual-mode (electric and chemical) propulsion systems is continuing.

  8. ATMOSPHERIC AEROSOL SOURCE-RECEPTOR RELATIONSHIPS: THE ROLE OF COAL-FIRED POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allen L. Robinson; Spyros N. Pandis; Cliff I. Davidson

    2004-12-01

    This report describes the technical progress made on the Pittsburgh Air Quality Study (PAQS) during the period of March 2004 through August 2004. Significant progress was made this project period on the analysis of ambient data, source apportionment, and deterministic modeling activities. Results highlighted in this report include evaluation of the performance of PMCAMx+ for an air pollution episode in the Eastern US, an emission profile for a coke production facility, ultrafine particle composition during a nucleation event, and a new hybrid approach for source apportionment. An agreement was reached with a utility to characterize fine particle and mercury emissionsmore » from a commercial coal fired power. Research in the next project period will include source testing of a coal fired power plant, source apportionment analysis, emission scenario modeling with PMCAMx+, and writing up results for submission as journal articles.« less

  9. KSC-91PC-0264

    NASA Image and Video Library

    1991-02-20

    CAPE CANAVERAL, Fla. -- Vice President of the United States Dan Quayle. right. tries on a communications headset in the Launch Control Center and learns about firing room activities from Launch Director Robert Sieck. Quayle spoke with members of the STS-39 flight crew participating in the Terminal Countdown Demonstration Test, toured the launch pad and other center facilities, addressed workers and held a press conference. Image credit: NASA

  10. 1. Credit PSR. This view captures the main entrance to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Credit PSR. This view captures the main entrance to the Administration/Shops Building, constructed in 1963, looking north northeast (30°). The plaque at the base of the flagpole commemorates the first firing of a liquid-fueled rocket engine at Test Stand "A" in 1945. - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA

  11. The tropical forest and fire emissions experiment: Laboratory fire measurement and synthesis of campaign data

    Treesearch

    R. J. Yokelson; T. J. Christian; T. G. Karl; A. Guenther

    2008-01-01

    As part of the Tropical Forest and Fire Emissions Experiment (TROFFEE), tropical forest fuels were burned in a large, biomass-fire simulation facility and the smoke was characterized with open-path Fourier transform infrared spectroscopy (FTIR), proton-transfer reaction mass spectrometry (PTR-MS), gas chromatography (GC), GC/PTRMS, and filter sampling of the particles...

  12. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  13. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  14. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  15. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  16. 40 CFR Appendix F to Part 52 - Clean Air Act Section 126 Petitions From Eight Northeastern States: Named Source Categories and...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Petitions Petitioning state Named source categories Connecticut Fossil fuel-fired boilers or other indirect.... New Hampshire Fossil fuel-fired indirect heat exchange combustion units and fossil fuel-fired electric generating facilities which emit ten tons of NOX or more per day. New York Fossil fuel-fired boilers or...

  17. 10 CFR Appendix R to Part 50 - Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... could occur in a nuclear power plant. These sessions shall provide brigade members with experience in... A. Fire protection program. A fire protection program shall be established at each nuclear power... fires that could occur in the plant and in using the types of equipment available in the nuclear power...

  18. Chemical Pollution from Combustion of Modern Spacecraft Materials

    NASA Technical Reports Server (NTRS)

    Mudgett, Paul D.

    2013-01-01

    Fire is one of the most critical contingencies in spacecraft and any closed environment including submarines. Currently, NASA uses particle based technology to detect fires and hand-held combustion product monitors to track the clean-up and restoration of habitable cabin environment after the fire is extinguished. In the future, chemical detection could augment particle detection to eliminate frequent nuisance false alarms triggered by dust. In the interest of understanding combustion from both particulate and chemical generation, NASA Centers have been collaborating on combustion studies at White Sands Test Facility using modern spacecraft materials as fuels, and both old and new technology to measure the chemical and particulate products of combustion. The tests attempted to study smoldering pyrolysis at relatively low temperatures without ignition to flaming conditions. This paper will summarize the results of two 1-week long tests undertaken in 2012, focusing on the chemical products of combustion. The results confirm the key chemical products are carbon monoxide (CO), hydrogen cyanide (HCN), hydrogen fluoride (HF) and hydrogen chloride (HCl), whose concentrations depend on the particular material and test conditions. For example, modern aerospace wire insulation produces significant concentration of HF, which persists in the test chamber longer than anticipated. These compounds are the analytical targets identified for the development of new tunable diode laser based hand-held monitors, to replace the aging electrochemical sensor based devices currently in use on the International Space Station.

  19. 78 FR 59475 - Architectural Barriers Act Accessibility Guidelines; Outdoor Developed Areas

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... following outdoor constructed features provided at these facilities: Picnic tables, fire rings, grills... requirements for picnic tables, fire rings, grills, fireplaces, wood stoves, trash and recycling receptacles... have required 50 percent of picnic tables, fire rings, grills, and benches to comply with the...

  20. Manual for Public School Facilities Fire Prevention and Fire Inspections. [Revised].

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    Designed to provide instruction for New York State inspectors and school administrators completing the annual "Fire Safety Report," this document provides information regarding: (1) the Regulation and Code requirements; (2) inspection and enforcement processes; (3) disputes and procedures for appeal; and (4) financial considerations…

  1. 24 CFR 232.620 - Determination of compliance by HHS.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Special Requirements § 232.620 Determination of compliance by HHS. An... the fire safety equipment has been installed, will be in compliance with the HHS requirements for fire...

  2. A Tale of Two Chambers: Iterative Approaches and Lessons Learned from Life Support Systems Testing in Altitude Chambers

    NASA Technical Reports Server (NTRS)

    Callini, Gianluca

    2016-01-01

    With a brand new fire set ablaze by a serendipitous convergence of events ranging from a science fiction novel and movie ("The Martian"), to ground-breaking recent discoveries of flowing water on its surface, the drive for the journey to Mars seems to be in a higher gear than ever before. We are developing new spacecraft and support systems to take humans to the Red Planet, while scientists on Earth continue using the International Space Station as a laboratory to evaluate the effects of long duration space flight on the human body. Written from the perspective of a facility test director rather than a researcher, and using past and current life support systems tests as examples, this paper seeks to provide an overview on how facility teams approach testing, the kind of information they need to ensure efficient collaborations and successful tests, and how, together with researchers and principal investigators, we can collectively apply what we learn to execute future tests.

  3. The estimation of electrical cable fire-induced damage limits

    NASA Astrophysics Data System (ADS)

    Nowlen, S. P.; Jacobus, M. J.

    Sandia National Laboratories has, for several years, been engaged in the performance of both fire safety and electrical equipment qualification research under independent programs sponsored by the US Nuclear Regulatory Commission. Recent comparisons between electrical cable thermal damageability data gathered independently in these two efforts indicate that a direct correlation exists between certain of the recent cable thermal vulnerability information gathered under equipment qualification conditions and thermal damageability in a fire environment. This direct correlation allows for a significant expansion of the data base on estimated cable thermal vulnerability limits in a fire environment because of the wide range of cable types and products that have been evaluated as a part of the equipment qualification research. This paper provides a discussion of the basis for the derived correlation, and presents estimated cable thermal damage limits for a wide range of generic cable types and specific cable products. The supposition that a direct correlation exists is supported through direct comparisons of the test results for certain specific cable products. The proposed supplemental cable fire vulnerability data gained from examination of the equipment qualification results is presented. These results should be of particular interest to those engaged in the evaluation of fire risk for industrial facilities, including nuclear power plants.

  4. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  5. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  6. 24 CFR 232.515 - Refund of fees.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety... that the installation of fire safety equipment for the project has been prevented because of...

  7. Low Cost Propulsion Technology Testing at the Stennis Space Center: Propulsion Test Article and the Horizontal Test Facility

    NASA Technical Reports Server (NTRS)

    Fisher, Mark F.; King, Richard F.; Chenevert, Donald J.

    1998-01-01

    The need for low cost access to space has initiated the development of low cost liquid rocket engine and propulsion system hardware at the Marshall Space Flight Center. This hardware will be tested at the Stennis Space Center's B-2 test stand. This stand has been reactivated for the testing of the Marshall designed Fastrac engine and the Propulsion Test Article. The RP-1 and LOX engine is a turbopump fed gas generator rocket with an ablative nozzle which has a thrust of 60,000 lbf. The Propulsion Test Article (PTA) is a test bed for low cost propulsion system hardware including a composite RP-I tank, flight feedlines and pressurization system, stacked in a booster configuration. The PTA is located near the center line of the B-2 test stand, firing vertically into the water cooled flame deflector. A new second position on the B-2 test stand has been designed and built for the horizontal testing of the Fastrac engine in direct support of the X-34 launch vehicle. The design and integration of these test facilities as well as the coordination which was required between the two Centers is described and lessons learned are provided. The construction of the horizontal test position is discussed in detail. The activation of these facilities is examined and the major test milestones are described.

  8. An Earth-Based Equivalent Low Stretch Apparatus to Assess Material Flammability for Microgravity & Extraterrestrial Fire-Safety Applications

    NASA Technical Reports Server (NTRS)

    Olson, S. L.; Beeson, H.; Haas, J.

    2001-01-01

    One of the performance goals for NASA's enterprise of Human Exploration and Development of Space (HEDS) is to develop methods, data bases, and validating tests for material flammability characterization, hazard reduction, and fire detection/suppression strategies for spacecraft and extraterrestrial habitats. This work addresses these needs by applying the fundamental knowledge gained from low stretch experiments to the development of a normal gravity low stretch material flammability test method. The concept of the apparatus being developed uses the low stretch geometry to simulate the conditions of the extraterrestrial environment through proper scaling of the sample dimensions to reduce the buoyant stretch in normal gravity. The apparatus uses controlled forced-air flow to augment the low stretch to levels which simulate Lunar or Martian gravity levels. In addition, the effect of imposed radiant heat flux on material flammability can be studied with the cone heater. After breadboard testing, the apparatus will be integrated into NASA's White Sands Test Facility's Atmosphere-Controlled Cone Calorimeter for evaluation as a new materials screening test method.

  9. Multiple-Parameter, Low-False-Alarm Fire-Detection Systems

    NASA Technical Reports Server (NTRS)

    Hunter, Gary W.; Greensburg, Paul; McKnight, Robert; Xu, Jennifer C.; Liu, C. C.; Dutta, Prabir; Makel, Darby; Blake, D.; Sue-Antillio, Jill

    2007-01-01

    Fire-detection systems incorporating multiple sensors that measure multiple parameters are being developed for use in storage depots, cargo bays of ships and aircraft, and other locations not amenable to frequent, direct visual inspection. These systems are intended to improve upon conventional smoke detectors, now used in such locations, that reliably detect fires but also frequently generate false alarms: for example, conventional smoke detectors based on the blockage of light by smoke particles are also affected by dust particles and water droplets and, thus, are often susceptible to false alarms. In contrast, by utilizing multiple parameters associated with fires, i.e. not only obscuration by smoke particles but also concentrations of multiple chemical species that are commonly generated in combustion, false alarms can be significantly decreased while still detecting fires as reliably as older smoke-detector systems do. The present development includes fabrication of sensors that have, variously, micrometer- or nanometer-sized features so that such multiple sensors can be integrated into arrays that have sizes, weights, and power demands smaller than those of older macroscopic sensors. The sensors include resistors, electrochemical cells, and Schottky diodes that exhibit different sensitivities to the various airborne chemicals of interest. In a system of this type, the sensor readings are digitized and processed by advanced signal-processing hardware and software to extract such chemical indications of fires as abnormally high concentrations of CO and CO2, possibly in combination with H2 and/or hydrocarbons. The system also includes a microelectromechanical systems (MEMS)-based particle detector and classifier device to increase the reliability of measurements of chemical species and particulates. In parallel research, software for modeling the evolution of a fire within an aircraft cargo bay has been developed. The model implemented in the software can describe the concentrations of chemical species and of particulate matter as functions of time. A system of the present developmental type and a conventional fire detector were tested under both fire and false-alarm conditions in a Federal Aviation Administration cargo-compartment- testing facility. Both systems consistently detected fires. However, the conventional fire detector consistently generated false alarms, whereas the developmental system did not generate any false alarms.

  10. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  11. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  12. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  13. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  14. 46 CFR 108.486 - Helicopter decks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Helicopter decks. 108.486 Section 108.486 Shipping COAST... Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.486 Helicopter decks. At least two of the accesses to the helicopter landing deck must each have a fire hydrant on the unit's...

  15. Health and environmental effects of refuse derived fuel (RDF) production and RDF/coal co-firing technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Toole, J.J.; Wessels, T.E.; Lynch, J.F.

    1981-10-01

    Six facilities, representing the scope of different co-firing techniques with their associated RDF production systems were reviewed in detail for combustion equipment, firing modes, emission control systems, residue handling/disposal, and effluent wastewater treatment. These facilities encompass all currently operational or soon to be operational co-firing plants and associated RDF production systems. Occupational health and safety risks for these plants were evaluated on the basis of fatal and nonfatal accidents and disease arising from the respective fuel cycles, coal and RDF. Occupational risks include exposure to pathogenic organisms in the workplace. Unusual events that are life threatening in the RDF processingmore » industry (e.g., explosions) are also discussed and remedial and safety measures reviewed. 80 refs., 4 figs., 30 tabs.« less

  16. Fire Incident Reporting Manual

    DTIC Science & Technology

    1984-02-01

    Purpose 1-1 B. Scope 1-1 C. Procedures 1-1 D. Exclusions 1-3 E . Preparation 1-3 F. Information Requirements 1-4 CHAPTER 2 - INSTRUCTIONS FOR PREPARING DoD...Structure and Fire Data 2-16 4. Section D - Fire Protection Facilities (In Structures Only) 2-28 5. Section E - Losses 2-30 6. Section F - Times (24...Activities Program," February 21, 1976 ( e ) National Fire Protection Association (NFPA) Standard 901, "Uniform Coding for Fire Protection," 1976 (f) NFPA

  17. Development and Validation of a Computational Model for Predicting the Behavior of Plumes from Large Solid Rocket Motors

    NASA Technical Reports Server (NTRS)

    Wells, Jason E.; Black, David L.; Taylor, Casey L.

    2013-01-01

    Exhaust plumes from large solid rocket motors fired at ATK's Promontory test site carry particulates to high altitudes and typically produce deposits that fall on regions downwind of the test area. As populations and communities near the test facility grow, ATK has become increasingly concerned about the impact of motor testing on those surrounding communities. To assess the potential impact of motor testing on the community and to identify feasible mitigation strategies, it is essential to have a tool capable of predicting plume behavior downrange of the test stand. A software package, called PlumeTracker, has been developed and validated at ATK for this purpose. The code is a point model that offers a time-dependent, physics-based description of plume transport and precipitation. The code can utilize either measured or forecasted weather data to generate plume predictions. Next-Generation Radar (NEXRAD) data and field observations from twenty-three historical motor test fires at Promontory were collected to test the predictive capability of PlumeTracker. Model predictions for plume trajectories and deposition fields were found to correlate well with the collected dataset.

  18. Diffuser Test

    NASA Image and Video Library

    2007-09-13

    Tests begun at Stennis Space Center's E Complex Sept. 13 evaluated a liquid oxygen lead for engine start performance, part of the A-3 Test Facility Subscale Diffuser Risk Mitigation Project at SSC's E-3 Test Facility. Phase 1 of the subscale diffuser project, completed Sept. 24, was a series of 18 hot-fire tests using a 1,000-pound liquid oxygen and gaseous hydrogen thruster to verify maximum duration and repeatability for steam generation supporting the A-3 Test Stand project. The thruster is a stand-in for NASA's developing J-2X engine, to validate a 6 percent scale version of A-3's exhaust diffuser. Testing the J-2X at altitude conditions requires an enormous diffuser. Engineers will generate nearly 4,600 pounds per second of steam to reduce pressure inside A-3's test cell to simulate altitude conditions. A-3's exhaust diffuser has to be able to withstand regulated pressure, temperatures and the safe discharge of the steam produced during those tests. Before the real thing is built, engineers hope to work out any issues on the miniature version. Phase 2 testing is scheduled to begin this month.

  19. Life-Cycle Assessments of Selected NASA Ground-Based Test Facilities

    NASA Technical Reports Server (NTRS)

    Sydnor, George Honeycutt

    2012-01-01

    In the past two years, two separate facility-specific life cycle assessments (LCAs) have been performed as summer student projects. The first project focused on 13 facilities managed by NASA s Aeronautics Test Program (ATP), an organization responsible for large, high-energy ground test facilities that accomplish the nation s most advanced aerospace research. A facility inventory was created for each facility, and the operational-phase carbon footprint and environmental impact were calculated. The largest impacts stemmed from electricity and natural gas used directly at the facility and to generate support processes such as compressed air and steam. However, in specialized facilities that use unique inputs like R-134a, R-14, jet fuels, or nitrogen gas, these sometimes had a considerable effect on the facility s overall environmental impact. The second LCA project was conducted on the NASA Ames Arc Jet Complex and also involved creating a facility inventory and calculating the carbon footprint and environmental impact. In addition, operational alternatives were analyzed for their effectiveness at reducing impact. Overall, the Arc Jet Complex impact is dominated by the natural-gas fired boiler producing steam on-site, but alternatives were provided that could reduce the impact of the boiler operation, some of which are already being implemented. The data and results provided by these LCA projects are beneficial to both the individual facilities and NASA as a whole; the results have already been used in a proposal to reduce carbon footprint at Ames Research Center. To help future life cycle projects, several lessons learned have been recommended as simple and effective infrastructure improvements to NASA, including better utility metering and data recording and standardization of modeling choices and methods. These studies also increased sensitivity to and appreciation for quantifying the impact of NASA s activities.

  20. Hypergolic Propellants: The Handling Hazards and Lessons Learned from Use

    NASA Technical Reports Server (NTRS)

    Nufer, Brian

    2010-01-01

    Several unintentional hypergolic fluid related spills, fires, and explosions from the Apollo Program, the Space Shuttle Program, the Titan Program, and a few others have occurred over the past several decades. Spill sites include the following government facilities: Kennedy Space Center (KSC), Johnson Space Center (JSC), White Sands Test Facility (WSTF), Vandenberg Air Force Base (VAFB), Cape Canaveral Air Force Station (CCAFS), Edwards Air Force Base (EAFB), Little Rock AFB, and McConnell AFB. Until now, the only method of capturing the lessons learned from these incidents has been "word of mouth" or by studying each individual incident report. Through studying several dozen of these incidents, certain root cause themes are apparent. Scrutinizing these themes could prove to be highly beneficial to future hypergolic system testing, checkout, and operational use.

  1. Requirements and Regulations for Open Burning and Fire Training

    EPA Pesticide Factsheets

    Intentional burning of facilities is considered demolition under federal asbestos regulations, even if no asbestos is present. Learn about regulations and requirements for open burning and fire training.

  2. Fundamental Phenomena on Fuel Decomposition and Boundary-Layer Combustion Precesses with Applications to Hybrid Rocket Motors. Part 1; Experimental Investigation

    NASA Technical Reports Server (NTRS)

    Kuo, Kenneth K.; Lu, Yeu-Cherng; Chiaverini, Martin J.; Johnson, David K.; Serin, Nadir; Risha, Grant A.; Merkle, Charles L.; Venkateswaran, Sankaran

    1996-01-01

    This final report summarizes the major findings on the subject of 'Fundamental Phenomena on Fuel Decomposition and Boundary-Layer Combustion Processes with Applications to Hybrid Rocket Motors', performed from 1 April 1994 to 30 June 1996. Both experimental results from Task 1 and theoretical/numerical results from Task 2 are reported here in two parts. Part 1 covers the experimental work performed and describes the test facility setup, data reduction techniques employed, and results of the test firings, including effects of operating conditions and fuel additives on solid fuel regression rate and thermal profiles of the condensed phase. Part 2 concerns the theoretical/numerical work. It covers physical modeling of the combustion processes including gas/surface coupling, and radiation effect on regression rate. The numerical solution of the flowfield structure and condensed phase regression behavior are presented. Experimental data from the test firings were used for numerical model validation.

  3. KSC-2013-4198

    NASA Image and Video Library

    2013-11-20

    VAN HORN, Texas – Blue Origin test fires a powerful new hydrogen- and oxygen-fueled American rocket engine at the company's West Texas facility. During the test, the BE-3 engine fired at full power for more than two minutes to simulate a launch, then paused for about four minutes, mimicking a coast through space before it re-ignited for a brief final burn. The last phase of the test covered the work the engine could perform in landing the booster back softly on Earth. Blue Origin, a partner of NASA’s Commercial Crew Program, or CCP, is developing its Orbital Launch Vehicle, which could eventually be used to launch the company's Space Vehicle into orbit to transport crew and cargo to low-Earth orbit. CCP is aiding in the innovation and development of American-led commercial capabilities for crew transportation and rescue services to and from the station and other low-Earth orbit destinations by the end of 2017. For information about CCP, visit www.nasa.gov/commercialcrew. Photo credit: NASA/Lauren Harnett

  4. KSC-2013-4124

    NASA Image and Video Library

    2013-11-20

    VAN HORN, Texas – Blue Origin test fires a powerful new hydrogen- and oxygen-fueled American rocket engine at the company's West Texas facility. During the test, the BE-3 engine fired at full power for more than two minutes to simulate a launch, then paused for about four minutes, mimicking a coast through space before it re-ignited for a brief final burn. The last phase of the test covered the work the engine could perform in landing the booster back softly on Earth. Blue Origin, a partner of NASA’s Commercial Crew Program, or CCP, is developing its Orbital Launch Vehicle, which could eventually be used to launch the company's Space Vehicle into orbit to transport crew and cargo to low-Earth orbit. CCP is aiding in the innovation and development of American-led commercial capabilities for crew transportation and rescue services to and from the station and other low-Earth orbit destinations by the end of 2017. For information about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Blue Origin

  5. High explosive spot test analyses of samples from Operable Unit (OU) 1111

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McRae, D.; Haywood, W.; Powell, J.

    1995-01-01

    A preliminary evaluation has been completed of environmental contaminants at selected sites within the Group DX-10 (formally Group M-7) area. Soil samples taken from specific locations at this detonator facility were analyzed for harmful metals and screened for explosives. A sanitary outflow, a burn pit, a pentaerythritol tetranitrate (PETN) production outflow field, an active firing chamber, an inactive firing chamber, and a leach field were sampled. Energy dispersive x-ray fluorescence (EDXRF) was used to obtain semi-quantitative concentrations of metals in the soil. Two field spot-test kits for explosives were used to assess the presence of energetic materials in the soilmore » and in items found at the areas tested. PETN is the major explosive in detonators manufactured and destroyed at Los Alamos. No measurable amounts of PETN or other explosives were detected in the soil, but items taken from the burn area and a high-energy explosive (HE)/chemical sump were contaminated. The concentrations of lead, mercury, and uranium are given.« less

  6. Feasibility of a medium-size central cogenerated energy facility, energy management memorandum

    NASA Astrophysics Data System (ADS)

    Porter, R. W.

    1982-09-01

    The thermal-economic feasibility was studied of a medium-size central cogenerated energy facility designed to serve five varied industries. Generation options included one dual-fuel diesel and one gas turbine, both with waste heat boilers, and five fired boilers. Fuels included natural gas, and for the fired-boiler cases, also low-sulphur coal and municipal refuse. The fired-boiler cogeneration systems employed back-pressure steam turbines. For coal and refuse, the option of steam only without cogeneration was also assessed. The refuse-fired cases utilized modular incinerators. The options provided for a wide range of steam and electrical capacities. Deficient steam was assumed generated independently in existing equipment. Excess electrical power over that which could be displaced was assumed sold to Commonwealth Edison Company under PURPA (Public Utility Regulator Policies Act). The facility was assumed operated by a mutually owned corporation formed by the cogenerated power users. The economic analysis was predicted on currently applicable energy-investment tax credits and accelerated depreciation for a January 1985 startup date. Based on 100% equity financing, the results indicated that the best alternative was the modular-incinerator cogeneration system.

  7. Technology evaluation report: SITE (Superfund Innovative Technology Evaluation) program demonstration test. The American Combustion Pyretron Thermal Destruction System at the US EPA's (Environmental Protection Agency's) combustion research facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waterland, L.; Lee, J.W.

    1989-04-01

    A series of demonstration tests of the American Combustion, Inc., Thermal Destruction System was performed under the SITE program. This oxygen-enhanced combustion system was retrofit to the rotary-kiln incinerator at EPA's Combustion Research Facility. The system's performance was tested firing contaminated soil from the Stringfellow Superfund Site, both alone and mixed with a coal tar waste (KO87). Comparative performance with conventional incinerator operation was also tested. Compliance with the incinerator performance standards of 99.99% principal organic hazardous constituents (POHC) destruction and removal efficiency and particulate emissions of less than 180 mg/dscm at 7% O2 was measured for all tests. Themore » Pyretron system was capable of in-compliance performance at double the mixed waste feedrate and at a 60% increase in batch waste charge mass than possible with conventional incineration. Scrubber blowdown and kiln ash contained no detectable levels of any of the POHCs chosen.« less

  8. 4.5-kW Hall Effect Thruster Evaluated

    NASA Technical Reports Server (NTRS)

    Mason, Lee S.

    2000-01-01

    As part of an Interagency Agreement with the Air Force Research Lab (AFRL), a space simulation test of a Russian SPT 140 Hall Effect Thruster was completed in September 1999 at Vacuum Facility 6 at the NASA Glenn Research Center at Lewis Field. The thruster was subjected to a three-part test sequence that included thrust and performance characterization, electromagnetic interference, and plume contamination. SPT 140 is a 4.5-kW thruster developed under a joint agreement between AFRL, Atlantic Research Corp, and Space Systems/Loral, and was manufactured by the Fakal Experimental Design Bureau of Russia. All objectives were satisfied, and the thruster performed exceptionally well during the 120-hr test program, which comprised 33 engine firings. The Glenn testing provided a critical contribution to the thruster development effort, and the large volume and high pumping speed of this vacuum facility was key to the test s success. The low background pressure (1 10 6 torr) provided a more accurate representation of space vacuum than is possible in most vacuum chambers. The facility had been upgraded recently with new cryogenic pumps and sputter shielding to support the active electric propulsion program at Glenn. The Glenn test team was responsible for all test support equipment, including the thrust stand, power supplies, data acquisition, electromagnetic interference measurement equipment, and the contamination measurement system.

  9. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  10. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... physical facility; or (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes... as fires, floods, earthquakes, or tornadoes. (5) For cost reporting periods beginning on or after...

  11. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  12. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  13. 42 CFR 412.25 - Excluded hospital units: Common requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... physical facility or because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (c... (ii) Because of catastrophic events such as fires, floods, earthquakes, or tornadoes. (5) For cost...

  14. Hyperbaric Chamber Equipment: A Consolidated Equipment List from Selected Multiplace Hyperbaric Facilities.

    DTIC Science & Technology

    1983-12-01

    carbon dioxide scrubbers , air conditioning, communications, lighting, and fire detecting and fire extinguishing systems. Medical support equipment was...10 14 Humidity...............................11 5. Hydrocarb on...........................11 B. Carbon Dioxide Scrubbers .....................11 C...and ancillary equipment included gas/vapor monitoring equipment, carbon dioxide scrubbers , air conditioning, communications, lighting, and fire

  15. 76 FR 1192 - Notice of Lodging of Consent Decree Under the Clean Air Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ..., the Commonwealth will control particulate matter emissions at the facilities by either shutting down coal-fired boilers, installing air emission controls, or converting the coal-fired boilers to natural gas-fired boilers. The Commonwealth will pay a civil penalty of $300,000 for past violations. The...

  16. Fire Protection for Munitions in Underground Storage Facilities

    DTIC Science & Technology

    2001-12-01

    ESFR ) K-25, 165 F (74 C) sprinkler heads, manufactured by Tyco, to provide a discharge density of 0.6 gpm/ft2 (24.4 lpm/m2). The system consisted of...extinguish the fire before adjacent stacks were impacted. Results showed that ESFR K-25 pendant sprinkler heads will operate and inhibit fire spread

  17. When the Fire's Out: Learning from Adversity.

    ERIC Educational Resources Information Center

    Holden, Tom

    1997-01-01

    After a $7 million arson fire destroyed part of a Virginia Beach high school, about 1,200 students were temporarily relocated to a refurbished former mini-mall, and a 16-month recovery project was initiated. The new design improved library and art facilities. School officials have since learned to fight fire with simple precautions, such as…

  18. 40 CFR 80.1403 - Which fuels are not subject to the 20% GHG thresholds?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... construction after December 19, 2007, and are fired with natural gas, biomass, or a combination thereof, the... are fired with natural gas, biomass, or a combination thereof at all times the facility operated... produced through processes fired with natural gas, biomass, or any combination thereof. (e) The annual...

  19. The magnetohydrodynamics coal-fired flow facility

    NASA Astrophysics Data System (ADS)

    1995-01-01

    In this quarterly technical progress report, UTSI reports on the status of a multitask contract to develop the technology for the steam bottoming portion of a MHD Steam Combined Cycle Power Plant. The report describes the facility maintenance and environmental work completed, status of completing technical reports and certain key administrative actions occurring during the quarter. With program resources at a minimum to closeout the MHD program, no further testing occurred during the quarter, but the DOE CFFF facility was maintained in a standby status with winterization, preventive maintenance and repairs accomplished as needed. Plans and preparations progressed for environmental actions needed at the site to investigate and characterize the groundwater and for removal/disposal of asbestos in the cooling tower. Work continued to progress on archiving the results of the MHD program.

  20. The 5000 GPM firefighting module evaluation test

    NASA Technical Reports Server (NTRS)

    Burns, Ralph A.

    1986-01-01

    The 5000 GPM Firefighting Module development was sponsored and shared by the Navy Facilities Engineering Command. It is a lightweight, compact, self-contained, helicopter-transportable unit for fighting harbor and other specialty fires as well as for use in emergency and shipboard water pumping applications. This unit is a more advanced model of the original 1500 GPM module developed for the U.S. Coast Guard. The module and an evaluation test program conducted at the North Island Naval Air Station, San Diego, California, by NASA and the U.S. Navy, are described.

  1. Full-Scale Incineration System Demonstration Verification Test Burns at the Naval Battalion Construction Center, Gulfport, Mississippi. Volume 3. Treatability Tests. Part 2

    DTIC Science & Technology

    1991-07-01

    1525 C1:y: daho Falls State: r Zip: 83413 Telephoue Hunber: (2 16) 65-1763 4. Facilities Location: Number & Steet: Naval Construction Bat.tallcn...ed into the POTW: (a) Pollutants which create a fire or explosion hazard in the POTW; (b) Pollutants which will cause corrosive structural damage to...Haylon Located in the laboratory (1) 15-1b C02 Located in the trailer 482 / 4.3.8 Maximum Hypothetical Accident ( Explosion ) The maximum hypothetical

  2. LONG-TERM DEMONSTRATION OF SORBENT ENHANCEMENT ADDITIVE TECHNOLOGY FOR MERCURY CONTROL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jason D. Laumb; Dennis L. Laudal; Grant E. Dunham

    2011-05-27

    Long-term demonstration tests of advanced sorbent enhancement additive (SEA) technologies have been completed at five coal-fired power plants. The targeted removal rate was 90% from baseline conditions at all five stations. The plants included Hawthorn Unit 5, Mill Creek Unit 4, San Miguel Unit 1, Centralia Unit 2, and Hoot Lake Unit 2. The materials tested included powdered activated carbon, treated carbon, scrubber additives, and SEAs. In only one case (San Miguel) was >90% removal not attainable. The reemission of mercury from the scrubber at this facility prevented >90% capture.

  3. Saturn Apollo Program

    NASA Image and Video Library

    1965-04-01

    S-IB-1, the first flight version of the Saturn IB launch vehicle's first stage (S-IB stage), undergoes a full-duration static firing in Saturn IB static test stand at the Marshall Space Flight Center (MSFC) on April 13, 1965. Developed by the MSFC and built by the Chrysler Corporation at the Michoud Assembly Facility (MAF) in New Orleans, Louisiana, the 90,000-pound booster utilized eight H-1 engines to produce a combined thrust of 1,600,000 pounds. Between April 1965 and July 1968, MSFC performed thirty-two static tests on twelve different S-IB stages.

  4. 10. Helicopter pad, fire extinguisher at center, looking southwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Helicopter pad, fire extinguisher at center, looking southwest - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  5. KSC-06pd1204

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - An overview of the new Firing Room 4 shows the expanse of computer stations and the various operations the facility will be able to manage. FR4 is now designated the primary firing room for all remaining shuttle launches, and will also be used daily to manage operations in the Orbiter Processing Facilities and for integrated processing for the shuttle. The firing room now includes sound-suppressing walls and floors, new humidity control, fire-suppression systems and consoles, support tables with computer stations, communication systems and laptop computer ports. FR 4 also has power and computer network connections and a newly improved Checkout, Control and Monitor Subsystem. The renovation is part of the Launch Processing System Extended Survivability Project that began in 2003. United Space Alliance's Launch Processing System directorate managed the FR 4 project for NASA. Photo credit: NASA/Dimitri Gerondidakis

  6. Pipeline oil fire detection with MODIS active fire products

    NASA Astrophysics Data System (ADS)

    Ogungbuyi, M. G.; Martinez, P.; Eckardt, F. D.

    2017-12-01

    We investigate 85 129 MODIS satellite active fire events from 2007 to 2015 in the Niger Delta of Nigeria. The region is the oil base for Nigerian economy and the hub of oil exploration where oil facilities (i.e. flowlines, flow stations, trunklines, oil wells and oil fields) are domiciled, and from where crude oil and refined products are transported to different Nigerian locations through a network of pipeline systems. Pipeline and other oil facilities are consistently susceptible to oil leaks due to operational or maintenance error, and by acts of deliberate sabotage of the pipeline equipment which often result in explosions and fire outbreaks. We used ground oil spill reports obtained from the National Oil Spill Detection and Response Agency (NOSDRA) database (see www.oilspillmonitor.ng) to validate MODIS satellite data. NOSDRA database shows an estimate of 10 000 spill events from 2007 - 2015. The spill events were filtered to include largest spills by volume and events occurring only in the Niger Delta (i.e. 386 spills). By projecting both MODIS fire and spill as `input vector' layers with `Points' geometry, and the Nigerian pipeline networks as `from vector' layers with `LineString' geometry in a geographical information system, we extracted the nearest MODIS events (i.e. 2192) closed to the pipelines by 1000m distance in spatial vector analysis. The extraction process that defined the nearest distance to the pipelines is based on the global practices of the Right of Way (ROW) in pipeline management that earmarked 30m strip of land to the pipeline. The KML files of the extracted fires in a Google map validated their source origin to be from oil facilities. Land cover mapping confirmed fire anomalies. The aim of the study is to propose a near-real-time monitoring of spill events along pipeline routes using 250 m spatial resolution of MODIS active fire detection sensor when such spills are accompanied by fire events in the study location.

  7. NASA Hydrogen Peroxide Propellant Hazards Technical Manual

    NASA Technical Reports Server (NTRS)

    Baker, David L.; Greene, Ben; Frazier, Wayne

    2005-01-01

    The Fire, Explosion, Compatibility and Safety Hazards of Hydrogen Peroxide NASA technical manual was developed at the NASA Johnson Space Center White Sands Test Facility. NASA Technical Memorandum TM-2004-213151 covers topics concerning high concentration hydrogen peroxide including fire and explosion hazards, material and fluid reactivity, materials selection information, personnel and environmental hazards, physical and chemical properties, analytical spectroscopy, specifications, analytical methods, and material compatibility data. A summary of hydrogen peroxide-related accidents, incidents, dose calls, mishaps and lessons learned is included. The manual draws from art extensive literature base and includes recent applicable regulatory compliance documentation. The manual may be obtained by United States government agencies from NASA Johnson Space Center and used as a reference source for hazards and safe handling of hydrogen peroxide.

  8. Ecotoxicity of waste water from industrial fires fighting

    NASA Astrophysics Data System (ADS)

    Dobes, P.; Danihelka, P.; Janickova, S.; Marek, J.; Bernatikova, S.; Suchankova, J.; Baudisova, B.; Sikorova, L.; Soldan, P.

    2012-04-01

    As shown at several case studies, waste waters from extinguishing of industrial fires involving hazardous chemicals could be serious threat primary for surrounding environmental compartments (e.g. surface water, underground water, soil) and secondary for human beings, animals and plants. The negative impacts of the fire waters on the environment attracted public attention since the chemical accident in the Sandoz (Schweizerhalle) in November 1986 and this process continues. Last October, special Seminary on this topic has been organized by UNECE in Bonn. Mode of interaction of fire waters with the environment and potential transport mechanisms are still discussed. However, in many cases waste water polluted by extinguishing foam (always with high COD values), flammable or toxic dangerous substances as heavy metals, pesticides or POPs, are released to surface water or soil without proper decontamination, which can lead to environmental accident. For better understanding of this type of hazard and better coordination of firemen brigades and other responders, the ecotoxicity of such type of waste water should be evaluated in both laboratory tests and in water samples collected during real cases of industrial fires. Case studies, theoretical analysis of problem and toxicity tests on laboratory model samples (e.g. on bacteria, mustard seeds, daphnia and fishes) will provide additional necessary information. Preliminary analysis of waters from industrial fires (polymer material storage and galvanic plating facility) in the Czech Republic has already confirmed high toxicity. In first case the toxicity may be attributed to decomposition of burned material and extinguishing foams, in the latter case it can be related to cyanides in original electroplating baths. On the beginning of the year 2012, two years R&D project focused on reduction of extinguish waste water risk for the environment, was approved by Technology Agency of the Czech Republic.

  9. Mercury emission trend influenced by stringent air pollutants regulation for coal-fired power plants in Korea

    NASA Astrophysics Data System (ADS)

    Pudasainee, Deepak; Kim, Jeong-Hun; Seo, Yong-Chil

    2009-12-01

    Regulatory control of mercury emission from anthropogenic sources has become a global concern in the recent past. Coal-fired power plants are one of the largest sources of anthropogenic mercury emission into the atmosphere. This paper summarizes the current reducing trend of mercury emission as co-beneficial effect by more stringent regulation changes to control primary air pollutants with introducing test results from the commercial coal-fired facilities and suggesting a guideline for future regulatory development in Korea. On average, mercury emission concentrations ranged 16.3-2.7 μg Sm -3, 2.4-1.1 μg Sm -3, 3.1-0.7 μg Sm -3 from anthracite coal-fired power plants equipped with electrostatic precipitator (ESP), bituminous coal-fired power plants with ESP + flue gas desulphurization (FGD) and bituminous coal-fired power plants with selective catalytic reactor (SCR) + cold side (CS) - ESP + wet FGD, respectively. Among the existing air pollution control devices, the best configuration for mercury removal in coal-fired power plants was SCR + CS - ESP + wet FGD, which were installed due to the stringent regulation changes to control primary air pollutants emission such as SO 2, NOx and dust. It was estimated that uncontrolled and controlled mercury emission from coal-fired power plants as 10.3 ton yr -1 and 3.2 ton yr -1 respectively. After the installation of ESP, FGD and SCR system, following the enforcement of the stringent regulation, 7.1 ton yr -1 of mercury emission has been reduced (nearly 69%) from coal-fired power plants as a co-benefit control. Based on the overall study, a sample guideline including emission limits were suggested which will be applied to develop a countermeasure for controlling mercury emission from coal-fired power plants.

  10. MHD generator electrode development. Summary report, July 1, 1981-September 30, 1982

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rossing, B.R.; Buckman, R.W. Jr.; Pouchot, W.D.

    Emphasis on this program was the development of and understanding wastage mechanism(s) of metallic electrodes which may be suitable alternatives to platinum anode material for use in long-term open cycle, coal-fired MHD generator operations. The laboratory tests simulate both modes of material wastage observed in MHD electrode operation; i.e., arc erosion (melting/vaporization) and electrochemical corrosion. Based on experimental results from the electrochemical tests at 1473/sup 0/K, the rank order listing of the materials tested for anode applications were platinum, E-Brite 26-1 modified with a five percent addition of platinum, chromium, IN 601, E-Brite 26-1, and 330 stainless steel ranked inmore » decreasing order. The rank order listing based on the arc erosion test was platinum, chromium, E-Brite 26-1, 330 stainless steel, and IN 601. The relative arc erosion resistance of materials based on the AVCO Mark VII generator test results gave a rank order of platinum, 330 stainless steel, IN 601, and E-Brite 26-1. Engineering tests under simulated open-cycle coal-fired MHD operating conditions were performed in the 500 kW Westinghouse Electrode System Test Facility (WESTF). Tests were conducted on candidate metallic anode materials (cold wall) and ceramic anode (hot wall) materials. A ten-hour duration cold wall slagging test was conducted on platinum, E-Brite 26-1, 330 stainless steel and IN 601 and the results were similar to those obtained for those materials in the AVCO Mark VII generator tests. Non-slagging, super hot (>1700/sup 0/C) wall hafnia-rare earth oxide electrodes were tested in a sulfurous, western coal-fired MHD environment. All four ceramic electrode pairs were destroyed. 20 references.« less

  11. Coil-On-Plug Ignition for Oxygen/Methane Liquid Rocket Engines in Thermal-Vacuum Environments

    NASA Technical Reports Server (NTRS)

    Melcher, John C.; Atwell, Matthew J.; Morehead, Robert L.; Hurlbert, Eric A.; Bugarin, Luz; Chaidez, Mariana

    2017-01-01

    A coil-on-plug ignition system has been developed and tested for Liquid Oxygen (LOX)/liquid methane (LCH4) rocket engines operating in thermal vacuum conditions. The igniters were developed and tested as part of the Integrated Cryogenic Propulsion Test Article (ICPTA), previously tested as part of the Project Morpheus test vehicle. The ICPTA uses an integrated, pressure-fed, cryogenic LOX/LCH4 propulsion system including a reaction control system (RCS) and a main engine. The ICPTA was tested at NASA Glenn Research Center's Plum Brook Station in the Spacecraft Propulsion Research Facility (B-2) under vacuum and thermal vacuum conditions. A coil-on-plug ignition system has been developed to successfully demonstrate ignition reliability at these conditions while preventing corona discharge issues. The ICPTA uses spark plug ignition for both the main engine igniter and the RCS. The coil-on-plug configuration eliminates the conventional high-voltage spark plug cable by combining the coil and the spark plug into a single component. Prior to ICPTA testing at Plum Brook, component-level reaction control engine (RCE) and main engine igniter testing was conducted at NASA Johnson Space Center (JSC), which demonstrated successful hot-fire ignition using the coil-on-plug from sea-level ambient conditions down to 10(exp -2) torr. Integrated vehicle hot-fire testing at JSC demonstrated electrical and command/data system performance. Lastly, hot-fire testing at Plum Brook demonstrated successful ignitions at simulated altitude conditions at 30 torr and cold thermal-vacuum conditions at 6 torr. The test campaign successfully proved that coil-on-plug technology will enable integrated LOX/LCH4 propulsion systems in future spacecraft.

  12. Aerojet - Attitude Control Engines. Chapter 3, Appendix E

    NASA Technical Reports Server (NTRS)

    Pfeifer, Gerald R.

    2009-01-01

    All the engines were both qualification and acceptance tested at Marquardt s facilities. After we won the Apollo Program contract, we went off and built two vacuum test facilities, which simulated altitude continuous firing for as long as we wanted to run an engine. They would run days and days with the same capability we had on steam ejection. We did all of the testing in both for the qualification and the acceptance test. One of them was a large ball, which was an eighteen-foot diameter sphere, evacuated again with a big steam ejector system that could be used for system testing; that s where we did the Lunar Excursion Module testing. We put the whole cluster in there and tested the entire cluster at the simulated altitude conditions. The lowest altitude we tested at - typically an acceptance test - was 105,000 feet simulated altitude. The big ball - because people were interested in what they called goop formation, which is an unburned hydrazine product migrating to cold surfaces on different parts of spacecraft - was built to address those kinds of issues. We ran long-life tests in a simulated space environment with the entire inside of the test cell around the test article, liquid nitrogen cooled, so it could act as getter for any of the exhaust products. That particular facility could pull down to about 350,000 feet (atmosphere) equivalent altitude, which was pushing pretty close to the thermodynamic triple point of the MMH. It was a good test facility. Those facilities are no longer there. When the guys at Marquardt sold the company to what eventually became part of Aerojet, all those test facilities were cut off at the roots. I think they have a movie studio there at this point. That part of it is truly not recoverable, but it did some excellent high-altitude, space-equivalent testing at the time. Surprisingly, we had very few problems while testing in the San Fernando Valley. In the early 1960s, nobody had ever seen dinitrogen tetroxide (N2O4), so that wasn't too big a deal. We really did only make small, red clouds. In all the hundreds of thousands of tests and probably well over one million firings that I was around that place for, in all that thirty-something years, we had a total of one serious injury associated with rocket engine testing and propellants. Because we were trying to figure out what propellants would really be good, we tried all of the fun stuff like the carbon tetrafluoride, chlorine pentafluoride, and pure fluorine. The materials knowledge wasn't all that great at the time. On one test, the fluorine we had didn't react well with the copper they were using for tubing, and it managed to cause another unscheduled disassembly of the facility. It was very serious. It's like one of those Korean War stories. The technician happened to be walking past the test facility when it decided to blow itself up. A piece of copper tubing pierced one cheek and came out the other. That was the only serious accident in all of the engines handled in all those years. Now, we did have a problem with the EPA later because they figured out what the brown clouds were about. We built a whole bunch of exhaust mitigation scrubbers to take care of engine testing in the daytime. In general, we operated the big shuttle (RCS) engine, the 870- pounder at nominal conditions; they scrubbed the effluents pretty well. If you operated that same 870-pound force engine at a level where you get a lot of excess oxidizer, yeah, there s a brown cloud. But, you know, it doesn't show up well in the dark. They did do some of that. But, that s gone; it was addressed one way or another. RELEASED -

  13. Medicare and Medicaid programs; fire safety requirements for certain health care facilities; amendment. Interim final rule with comment period.

    PubMed

    2005-03-25

    This interim final rule with comment period adopts the substance of the April 15, 2004 temporary interim amendment (TIA) 00-1 (101), Alcohol Based Hand Rub Solutions, an amendment to the 2000 edition of the Life Safety Code, published by the National Fire Protection Association (NFPA). This amendment will allow certain health care facilities to place alcohol-based hand rub dispensers in egress corridors under specified conditions. This interim final rule with comment period also requires that nursing facilities install smoke detectors in resident rooms and public areas if they do not have a sprinkler system installed throughout the facility or a hard-wired smoke detection system in those areas.

  14. KSC-2012-1013

    NASA Image and Video Library

    2010-09-21

    POWAY, Calif. – During NASA's Commercial Crew Development Round 1 CCDev1 activities, the rocket motor under development by Sierra Nevada Corp. for its Dream Chaser spacecraft successfully fires at the company's rocket test facility located near San Diego. NASA team members reviewed the motor's system and then watched it fire three times in one day, including one firing under vacuum ignition conditions. The tests, which simulated a complete nominal mission profile, demonstrated the multiple restart capability of Sierra Nevada's hybrid rocket. Two of the company's designed and developed hybrid rocket motors will be used as the main propulsion system on the Dream Chaser after launching aboard an Atlas V rocket. Dream Chaser is one of five systems NASA invested in during CCDev1 in order to aid in the innovation and development of American-led commercial capabilities for crew transportation and rescue services to and from the International Space Station and other low Earth orbit destinations. In 2011, NASA's Commercial Crew Program CCP entered into another funded Space Act Agreement with Sierra Nevada for the second round of commercial crew development CCDev2) so the company could further develop its Dream Chaser spacecraft for NASA transportation services. For information about CCP, visit www.nasa.gov/commercialcrew. Photo credit: Sierra Nevada Corp.

  15. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  16. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  17. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  18. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  19. 40 CFR 60.730 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... facility. For the brick and related clay products industry, only the calcining and drying of raw materials prior to firing of the brick are covered. (b) An affected facility that is subject to the provisions of...

  20. Applications of UAVs for Remote Sensing of Critical Infrastructure

    NASA Technical Reports Server (NTRS)

    Wegener, Steve; Brass, James; Schoenung, Susan

    2003-01-01

    The surveillance of critical facilities and national infrastructure such as waterways, roadways, pipelines and utilities requires advanced technological tools to provide timely, up to date information on structure status and integrity. Unmanned Aerial Vehicles (UAVs) are uniquely suited for these tasks, having large payload and long duration capabilities. UAVs also have the capability to fly dangerous and dull missions, orbiting for 24 hours over a particular area or facility providing around the clock surveillance with no personnel onboard. New UAV platforms and systems are becoming available for commercial use. High altitude platforms are being tested for use in communications, remote sensing, agriculture, forestry and disaster management. New payloads are being built and demonstrated onboard the UAVs in support of these applications. Smaller, lighter, lower power consumption imaging systems are currently being tested over coffee fields to determine yield and over fires to detect fire fronts and hotspots. Communication systems that relay video, meteorological and chemical data via satellite to users on the ground in real-time have also been demonstrated. Interest in this technology for infrastructure characterization and mapping has increased dramatically in the past year. Many of the UAV technological developments required for resource and disaster monitoring are being used for the infrastructure and facility mapping activity. This paper documents the unique contributions from NASA;s Environmental Research Aircraft and Sensor Technology (ERAST) program to these applications. ERAST is a UAV technology development effort by a consortium of private aeronautical companies and NASA. Details of demonstrations of UAV capabilities currently underway are also presented.

  1. Advanced Initiation Systems Manufacturing Level 2 Milestone Completion Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chow, R; Schmidt, M

    2009-10-01

    Milestone Description - Advanced Initiation Systems Detonator Design and Prototype. Milestone Grading Criteria - Design new generation chip slapper detonator and manufacture a prototype using advanced manufacturing processes, such as all-dry chip metallization and solvent-less flyer coatings. The advanced processes have been developed for manufacturing detonators with high material compatibility and reliability to support future LEPs, e.g. the B61, and new weapons systems. Perform velocimetry measurements to determine slapper velocity as a function of flight distance. A prototype detonator assembly and stripline was designed for low-energy chip slappers. Pictures of the prototype detonator and stripline are shown. All-dry manufacturing processesmore » were used to address compatibility issues. KCP metallized the chips in a physical vapor deposition system through precision-aligned shadow masks. LLNL deposited a solvent-less polyimide flyer with a processes called SLIP, which stands for solvent-less vapor deposition followed by in-situ polymerization. LANL manufactured the high-surface-area (HSA) high explosive (HE) pellets. Test fires of two chip slapper designs, radius and bowtie, were performed at LLNL in the High Explosives Application Facility (HEAF). Test fires with HE were conducted to establish the threshold firing voltages. pictures of the chip slappers before and after test fires are shown. Velocimetry tests were then performed to obtain slapper velocities at or above the threshold firing voltages. Figure 5 shows the slapper velocity as a function of distance and time at the threshold voltage, for both radius and bowtie bridge designs. Both designs were successful at initiating the HE at low energy levels. Summary of Accomplishments are: (1) All-dry process for chip manufacture developed; (2) Solventless process for slapper materials developed; (3) High-surface area explosive pellets developed; (4) High performance chip slappers developed; (5) Low-energy chip slapper detonator designs; and (6) Low-voltage threshold chip slapper detonator demonstrated.« less

  2. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  3. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  4. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  5. 24 CFR 201.20 - Property improvement loan eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... preservation of historic structures. (2) Where the proceeds are to be used for a fire safety equipment loan... jurisdiction over the fire safety requirements of health care facilities prior to making application for a loan...

  6. Radio frequency security system, method for a building facility or the like, and apparatus and methods for remotely monitoring the status of fire extinguishers

    DOEpatents

    Runyon, Larry [Richland, WA; Gunter, Wayne M [Richland, WA; Gilbert, Ronald W [Gilroy, CA

    2006-07-25

    A system for remotely monitoring the status of one or more fire extinguishers includes means for sensing at least one parameter of each of the fire extinguishers; means for selectively transmitting the sensed parameters along with information identifying the fire extinguishers from which the parameters were sensed; and means for receiving the sensed parameters and identifying information for the fire extinguisher or extinguishers at a common location. Other systems and methods for remotely monitoring the status of multiple fire extinguishers are also provided.

  7. 24 CFR 232.522 - Inspection fee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  8. 24 CFR 232.560 - Interest rate.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  9. 24 CFR 232.600 - Title evidence.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING FACILITIES Eligibility Requirements-Supplemental Loans To Finance Purchase and Installation of Fire Safety...

  10. Recovery Act: Oxy-Combustion Techology Development for Industrial-Scale Boiler Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levasseur, Armand

    2014-04-30

    Alstom Power Inc. (Alstom), under U.S. DOE/NETL Cooperative Agreement No. DE-NT0005290, is conducting a development program to generate detailed technical information needed for application of oxy-combustion technology. The program is designed to provide the necessary information and understanding for the next step of large-scale commercial demonstration of oxy combustion in tangentially fired boilers and to accelerate the commercialization of this technology. The main project objectives include: • Design and develop an innovative oxyfuel system for existing tangentially-fired boiler units that minimizes overall capital investment and operating costs. • Evaluate performance of oxyfuel tangentially fired boiler systems in pilot scale testsmore » at Alstom’s 15 MWth tangentially fired Boiler Simulation Facility (BSF). • Address technical gaps for the design of oxyfuel commercial utility boilers by focused testing and improvement of engineering and simulation tools. • Develop the design, performance and costs for a demonstration scale oxyfuel boiler and auxiliary systems. • Develop the design and costs for both industrial and utility commercial scale reference oxyfuel boilers and auxiliary systems that are optimized for overall plant performance and cost. • Define key design considerations and develop general guidelines for application of results to utility and different industrial applications. The project was initiated in October 2008 and the scope extended in 2010 under an ARRA award. The project completion date was April 30, 2014. Central to the project is 15 MWth testing in the BSF, which provided in-depth understanding of oxy-combustion under boiler conditions, detailed data for improvement of design tools, and key information for application to commercial scale oxy-fired boiler design. Eight comprehensive 15 MWth oxy-fired test campaigns were performed with different coals, providing detailed data on combustion, emissions, and thermal behavior over a matrix of fuels, oxyprocess variables and boiler design parameters. Significant improvement of CFD modeling tools and validation against 15 MWth experimental data has been completed. Oxy-boiler demonstration and large reference designs have been developed, supported with the information and knowledge gained from the 15 MWth testing. The results from the 15 MWth testing in the BSF and complimentary bench-scale testing are addressed in this volume (Volume II) of the final report. The results of the modeling efforts (Volume III) and the oxy boiler design efforts (Volume IV) are reported in separate volumes.« less

  11. Spreading the Word on Safety

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Beginning with the Apollo Program in the early 1960s, the NASA White Sands Test Facility (WSTF) has supported every U.S. human exploration space flight program to date. Located in Las Cruces, New Mexico, WSTF is part of Johnson Space Center. The facility's primary mission is to provide the expertise and infrastructure to test and evaluate spacecraft materials, components, and rocket propulsion systems to enable the safe human exploration and utilization of space. WSTF stores, tests, and disposes of Space Shuttle and International Space Station propellants. Since aerospace fluids can have harmful reactions with the construction materials of the systems containing them, a major component of WSTF's work is the study of propellants and hazardous materials. WSTF has a wide variety of resources to draw upon in assessing the fire, explosion, compatibility, and safety hazards of these fluids, which include hydrogen, oxygen, hydrazine fuels, and nitrogen tetroxide. In addition to developing new test methods, WSTF has created technical manuals and training courses for the safe use of aerospace fluids.

  12. Flow Effects on the Flammability Diagrams of Solid Fuels

    NASA Technical Reports Server (NTRS)

    Cordova, J. L.; Ceamanos, J.; Fernandez-Pello, A. C.; Long, R. T.; Torero, J. L.; Quintiere, J. G.

    1997-01-01

    A research program is currently underway with the final objective of developing a fundamental understanding of the controlling mechanisms underlying the flammability diagrams of solid combustible materials and their derived fire properties. Given that there is a high possibility of an accidental fire occurring in a space-based facility, understanding the fire properties of materials that will be used in such facilities is of critical importance. With this purpose, the flammability diagrams of the materials, as those produced by the Lateral Ignition and Flame Spread Test (LIFT) apparatus and by a new forced flow device, the Forced Flow Ignition and Flame Spread Test (FIST) apparatus, will be obtained. The specific objective of the program is to apply the new flammability apparatus, which will more accurately reflect the potential ambient conditions of space-based environments, to the characterization of the materials for space applications. This paper presents a parametric study of oxidizer flow effects on the ignition curve of the flammability diagrams of PMMA. The dependence of the ignition delay time on the external radiant flux and either the sample width (LIFT) or the flow velocity (FIST) has been studied. Although preliminary, the results indicate that natural and forced convection flow changes, affect the characteristics of the ignition curves of the flammability diagrams. The major effect on the ignition time appears to be due to convective transfer variations at the fuel surface. At high radiant fluxes or high flow velocities, however, it appears that gas phase processes become increasingly important, affecting the overall ignition delay time. A numerical analysis of the solid fuel heating and pyrolysis has also been developed. The theoretical predictions approximate the experiments well for conditions in which the gas phase induction time is negligible.

  13. Identifying atmospheric monitoring needs for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Casserly, Dennis M.

    1989-01-01

    The atmospheric monitoring needs for Space Station Freedom were identified by examining the following from an industrial hygiene perspective: the experiences of past missions; ground based tests of proposed life support systems; the unique experimental and manufacturing facilities; the contaminant load model; metabolic production; and a fire. A target list of compounds to be monitored is presented and information is provided relative to the frequency of analysis, concentration ranges, and locations for monitoring probes.

  14. Wernher von Braun

    NASA Image and Video Library

    1964-03-24

    Marshall Space Flight Center Director Dr. Wernher von Braun presents Lady Bird Johnson with an inscribed hard hat during the First Lady's March 24, 1964 visit. While at the Marshall Center, Mrs. Johnson addressed Center employees, toured facilities and witnessed test firings of a Saturn I first stage and an F-1 engine. Dr. von Braun is wearing a Texas hat presented to him months earlier by Lyndon Johnson during a visit to the Johnson ranch in Texas.

  15. International Space Station Lithium-Ion Main Battery Thermal Runaway Propagation Test

    NASA Technical Reports Server (NTRS)

    Dalton, Penni J.; North, Tim

    2017-01-01

    In 2010, the ISS Program began the development of Lithium-Ion (Li-Ion) batteries to replace the aging Ni-H2 batteries on the primary Electric Power System (EPS). After the Boeing 787 Li-Ion battery fires, the NASA Engineering and Safety Center (NESC) Power Technical Discipline Team was tasked by ISS to investigate the possibility of Thermal Runaway Propagation (TRP) in all Li-Ion batteries used on the ISS. As part of that investigation, NESC funded a TRP test of an ISS EPS non-flight Li-Ion battery. The test was performed at NASA White Sands Test Facility in October 2016. This paper will discuss the work leading up to the test, the design of the test article, and the test results.

  16. [Protecting Safety During Dust Fires and Dust Explosions - The Example of the Formosa Fun Coast Water Park Accident].

    PubMed

    Hsieh, Ming-Hong; Wu, Jia-Wun; Li, Ya-Cing; Tang, Jia-Suei; Hsieh, Chun-Chien

    2016-02-01

    This paper will explore the fire and explosion characteristics of cornstarch powder as well as strategies for protecting the safety of people who are involved a dust fire or dust explosion. We discuss the 5 elements of dust explosions and conduct tests to analyze the fire and explosion characteristics of differently colored powders (yellow, golden yellow, pink, purple, orange and green). The results show that, while all of the tested powders were difficult to ignite, low moisture content was associated with significantly greater risks of ignition and flame spread. We found the auto-ignition temperature (AIT) of air-borne cornstarch powder to be between 385°C and 405°C, with yellow-colored cornstarch powder showing the highest AIT and pink-colored cornstarch powder showing the lowest AIT. The volume resistivity of all powder samples was approximately 108 Ω.m, indicating that they were nonconductive. Lighters and cigarettes are effective ignition sources, as their lit temperatures are higher than the AIT of cornstarch powder. In order to better protect the safety of individuals at venues where cornstarch powder is released, explosion control measures such as explosion containment facilities, vents, and explosion suppression and isolation devices should be installed. Furthermore, employees that work at these venues should be better trained in explosion prevention and control measures. We hope this article is a reminder to the public to recognize the fire and explosion characteristics of flammable powders as well as the preventive and control measures for dust explosions.

  17. Fire/security staff member instructs STS-29 crew on fire extinguisher usage

    NASA Image and Video Library

    1988-12-06

    S88-54948 (6 Dec 1988) --- The STS-29 crewmembers are trained in procedures to follow in the event of a fire with their spacecraft. Here, the crew is briefed on correct handling of the fire extinguisher by Robert Fife (far left) of NASA's fire and security staff. Pictured, left to right, are Astronauts John E. Blaha, pilot; Michael L. Coats, mission commander; Robert C. Springer, James F. Buchli and James P. Bagian, mission specialists. The training exercise took place on the northern end of the 1625-acre JSC facility.

  18. FGC Webinar: From Fires to Floods and Everything In Between

    EPA Pesticide Factsheets

    Federal Green Challenge presentations from the April 2018 'Billion Dollar Weather Events' webinar From Fires to Floods and Everything in Between: How Federal Facilities Can Thrive in an Era of Billion Dollar Weather Events.

  19. Structural ceramics containing electric arc furnace dust.

    PubMed

    Stathopoulos, V N; Papandreou, A; Kanellopoulou, D; Stournaras, C J

    2013-11-15

    In the present work the stabilization of electric arc furnace dust EAFD waste in structural clay ceramics was investigated. EAFD was collected over eleven production days. The collected waste was characterized for its chemical composition by Flame Atomic Absorption Spectroscopy. By powder XRD the crystal structure was studied while the fineness of the material was determined by a laser particle size analyzer. The environmental characterization was carried out by testing the dust according to EN12457 standard. Zn, Pb and Cd were leaching from the sample in significant amounts. The objective of this study is to investigate the stabilization properties of EAFD/clay ceramic structures and the potential of EAFD utilization into structural ceramics production (blocks). Mixtures of clay with 2.5% and 5% EAFD content were studied by TG/DTA, XRD, SEM, EN12457 standard leaching and mechanical properties as a function of firing temperature at 850, 900 and 950 °C. All laboratory facilities maintained 20 ± 1 °C. Consequently, a pilot-scale experiment was conducted with an addition of 2.5% and 5% EAFD to the extrusion mixture for the production of blocks. During blocks manufacturing, the firing step reached 950 °C in a tunnel kiln. Laboratory heating/cooling gradients were similar to pilot scale production firing. The as produced blocks were then subjected to quality control tests, i.e. dimensions according to EN772-17, water absorbance according to EN772-6, and compressive strength according to EN772-1 standard, in laboratory facilities certified under EN17025. The data obtained showed that the incorporation of EAFD resulted in an increase of mechanical strength. Moreover, leaching tests performed according to the Europeans standards on the EAFD-block samples showed that the quantities of heavy metals leached from crushed blocks were within the regulatory limits. Thus the EAFD-blocks can be regarded as material of no environmental concern. Copyright © 2013 Elsevier B.V. All rights reserved.

  20. Elevated Blood Lead Levels Among Fire Assay Workers and Their Children in Alaska, 2010–2011

    PubMed Central

    Kirk, Cassandra; Fearey, Donna; Castrodale, Louisa J.; Verbrugge, David; McLaughlin, Joseph

    2015-01-01

    In October 2010, an employee at Facility A in Alaska that performs fire assay analysis, an industrial technique that uses lead-containing flux to obtain metals from pulverized rocks, was reported to the Alaska Section of Epidemiology (SOE) with an elevated blood lead level (BLL) ≥10 micrograms per deciliter (μg/dL). The SOE initiated an investigation; investigators interviewed employees, offered blood lead screening to employees and their families, and observed a visit to the industrial facility by the Alaska Occupational Safety and Health Section (AKOSH). Among the 15 employees with known work responsibilities, 12 had an elevated BLL at least once from October 2010 through February 2011. Of these 12 employees, 10 reported working in the fire assay room. Four children of employees had BLLs ≥5 μg/dL. Employees working in Facility A's fire assay room were likely exposed to lead at work and could have brought lead home. AKOSH inspectors reported that they could not share their consultative report with SOE investigators because of the confidentiality requirements of a federal regulation, which hampered Alaska SOE investigators from fully characterizing the lead exposure standards. PMID:26327721

  1. Elevated Blood Lead Levels Among Fire Assay Workers and Their Children in Alaska, 2010-2011.

    PubMed

    Porter, Kimberly A; Kirk, Cassandra; Fearey, Donna; Castrodale, Louisa J; Verbrugge, David; McLaughlin, Joseph

    2015-01-01

    In October 2010, an employee at Facility A in Alaska that performs fire assay analysis, an industrial technique that uses lead-containing flux to obtain metals from pulverized rocks, was reported to the Alaska Section of Epidemiology (SOE) with an elevated blood lead level (BLL) ≥10 micrograms per deciliter (μg/dL). The SOE initiated an investigation; investigators interviewed employees, offered blood lead screening to employees and their families, and observed a visit to the industrial facility by the Alaska Occupational Safety and Health Section (AKOSH). Among the 15 employees with known work responsibilities, 12 had an elevated BLL at least once from October 2010 through February 2011. Of these 12 employees, 10 reported working in the fire assay room. Four children of employees had BLLs ≥5 μg/dL. Employees working in Facility A's fire assay room were likely exposed to lead at work and could have brought lead home. AKOSH inspectors reported that they could not share their consultative report with SOE investigators because of the confidentiality requirements of a federal regulation, which hampered Alaska SOE investigators from fully characterizing the lead exposure standards.

  2. Guide for Oxygen Compatibility Assessments on Oxygen Components and Systems

    NASA Technical Reports Server (NTRS)

    Rosales, Keisa R.; Shoffstall, Michael S.; Stoltzfus, Joel M.

    2007-01-01

    Understanding and preventing fire hazards is necessary when designing, maintaining, and operating oxygen systems. Ignition risks can be minimized by controlling heat sources and using materials that will not ignite or will not support burning in the end-use environment. Because certain materials are more susceptible to ignition in oxygen-enriched environments, a compatibility assessment should be performed before the component is introduced into an oxygen system. This document provides an overview of oxygen fire hazards and procedures that are consistent with the latest versions of American Society for Testing and Materials (ASTM) Standards G63 (1999) and G94 (2005) to address fire hazards associated with oxygen systems. This document supersedes the previous edition, NASA Technical Memorandum 104823, Guide for Oxygen Hazards Analyses on Components and Systems (1996). The step-by-step oxygen compatibility assessment method described herein (see Section 4) enables oxygen-system designers, system engineers, and facility managers to determine areas of concern with respect to oxygen compatibility and, ultimately, prevent damage to a system or injury to personnel.

  3. New Technologies Being Developed for the Thermophoretic Sampling of Smoke Particulates in Microgravity

    NASA Technical Reports Server (NTRS)

    Sheredy, William A.

    2003-01-01

    The Characterization of Smoke Particulate for Spacecraft Fire Detection, or Smoke, microgravity experiment is planned to be performed in the Microgravity Science Glovebox Facility on the International Space Station (ISS). This investigation, which is being developed by the NASA Glenn Research Center, ZIN Technologies, and the National Institute of Standards and Technologies (NIST), is based on the results and experience gained from the successful Comparative Soot Diagnostics experiment, which was flown as part of the USMP-3 (United States Microgravity Payload 3) mission on space shuttle flight STS-75. The Smoke experiment is designed to determine the particle size distributions of the smokes generated from a variety of overheated spacecraft materials and from microgravity fires. The objective is to provide the data that spacecraft designers need to properly design and implement fire detection in spacecraft. This investigation will also evaluate the performance of the smoke detectors currently in use aboard the space shuttle and ISS for the test materials in a microgravity environment.

  4. Final Environmental Assessment For the Construction and Operation of a Fire Training Facility

    DTIC Science & Technology

    2010-04-29

    practice drafting (i.e., water uptake through hoses ) operations during live fires. The proposed drafting pit would also allow the department to...FTF to allow the Clear FD to practice drafting (i.e., water uptake through hoses ) operations during live fires. The proposed drafting pit would also...respirators, etc.), but trucks, hoses , and other large equipment would need to be supplied by the host fire department (so as not to leave Clear AFS

  5. Credit WCT. Photographic copy of photograph, interior view of Dd ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit WCT. Photographic copy of photograph, interior view of Dd test cell with VO (Viking Orbiter)-75 spacecraft engine mounted for testing. (Viking was a Mars orbiter and lander mission.) The end of the engine nozzle is inserted into a diffuser in order to conduct exhaust gases out of the chamber. All piping and tubing is stainless steel. Note ports in background through which instrumentation wiring passes. Nozzles at top of view are part of an internal fire suppression (or "Firex") system. (JPL negative no. 384-9428, 24 April 1972) - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  6. An Overview of Propulsion Concept Studies and Risk Reduction Activities for Robotic Lunar Landers

    NASA Technical Reports Server (NTRS)

    Trinh, Huu P.; Story, George; Burnside, Chris; Kudlach, Al

    2010-01-01

    In support of designing robotic lunar lander concepts, the propulsion team at NASA Marshall Space Flight Center (MSFC) and the Johns Hopkins University Applied Physics Laboratory (APL), with participation from industry, conducted a series of trade studies on propulsion concepts with an emphasis on light-weight, advanced technology components. The results suggest a high-pressure propulsion system may offer some benefits in weight savings and system packaging. As part of the propulsion system, a solid rocket motor was selected to provide a large impulse to reduce the spacecraft s velocity prior to the lunar descent. In parallel to this study effort, the team also began technology risk reduction testing on a high thrust-to-weight descent thruster and a high-pressure regulator. A series of hot-fire tests was completed on the descent thruster in vacuum conditions at NASA White Sands Test Facility (WSTF) in New Mexico in 2009. Preparations for a hot-fire test series on the attitude control thruster at WSTF and for pressure regulator testing are now underway. This paper will provide an overview of the concept trade study results along with insight into the risk mitigation activities conducted to date.

  7. Facilities Maintenance in the U.S. Navy

    DTIC Science & Technology

    1986-01-01

    Row’a9IVI s..Nl,I I~de 14. 11111116104 It. safeI MeAI. 5,124 AN (:lgnd) JOHN SMITH I765 IIf Figure 111-1 Work Request is EMIROENCY/SERVICE WORK...Eliminate fire, health and active life of less than 3 years safety hazards o Infrequently or only partially o Patch and reinforce instead used of...safety or health hazards and to permit reactivation within the period prescribed under mobili- zation plans o Surplus facilities a Fliminate fire, safety

  8. FEANICS: A Multi-User Facility For Conducting Solid Fuel Combustion Experiments On ISS

    NASA Technical Reports Server (NTRS)

    Frate, David T.; Tofil, Todd A.

    2001-01-01

    The Destiny Module on the International Space Station (ISS) will soon be home for the Fluids and Combustion Facility's (FCF) Combustion Integrated Rack (CIR), which is being developed at the NASA Glenn Research Center in Cleveland, Ohio. The CIR will be the platform for future microgravity combustion experiments. A multi-user mini-facility called FEANICS (Flow Enclosure Accommodating Novel Investigations in Combustion of Solids) will also be built at NASA Glenn. This mini-facility will be the primary means for conducting solid fuel combustion experiments in the CIR on ISS. The main focus of many of these solid combustion experiments will be to conduct basic and applied scientific investigations in fire-safety to support NASA's Bioastronautics Initiative. The FEANICS project team will work in conjunction with the CIR project team to develop upgradeable and reusable hardware to meet the science requirements of current and future investigators. Currently, there are six experiments that are candidates to use the FEANICS mini-facility. This paper will describe the capabilities of this mini-facility and the type of solid combustion testing and diagnostics that can be performed.

  9. Small-diameter timber alchemy: can utilization pay the way toward fire-resistant forests

    Treesearch

    Jeremy S. Fried; R. Jamie Barbour; Roger D. Fight; Glenn Christensen; Guy Pinjuv

    2008-01-01

    There is growing interest in using biomass removed from hazardous fuels reduction treatments in wood-fired electrical generation facilities. An application of FIA BioSum to southwest Oregon’s Klamath ecoregion assessed the financial feasibility of fuel treatment and biomass generation under a range of product prices and fire hazard-motivated silvicultural prescriptions...

  10. Military Housing Inspection-Camp Buehring, Kuwait

    DTIC Science & Technology

    2016-09-30

    General DPW Director Public Works FAS Fire Alarm System HVAC Heating, Ventilation, and Air Conditioning IAW In Accordance With ITM Inspection...safety policies and standards regarding electrical and fire protection systems . Findings We found significant deficiencies in electrical and fire...protection systems during the physical inspections of the U.S. military-occupied facilities at Camp Buehring. We identified a total of 538

  11. Fire safety concerns in space operations

    NASA Technical Reports Server (NTRS)

    Friedman, Robert

    1987-01-01

    This paper reviews the state-of-the-art in fire control techniques and identifies important issues for continuing research, technology, and standards. For the future permanent orbiting facility, the space station, fire prevention and control calls for not only more stringent fire safety due to the long-term and complex missions, but also for simplified and flexible safety rules to accommodate the variety of users. Future research must address a better understanding of the microgravity space environment as it influences fire propagation and extinction and the application of the technology of fire detection, extinguishment, and material assessment. Spacecraft fire safety should also consider the adaptation of methods and concepts derived from aircraft and undersea experience.

  12. 30 CFR 57.4160 - Underground electric substations and liquid storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4160... noncombustible materials with equivalent fire protection characteristics. ...

  13. 77. Deputy commander's launch control console, fire control panel missing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    77. Deputy commander's launch control console, fire control panel missing at right, south side - Ellsworth Air Force Base, Delta Flight, Launch Control Facility, County Road CS23A, North of Exit 127, Interior, Jackson County, SD

  14. 17. VIEW OF EQUIPMENT BURNED IN A TITANIUM FIRE. (11/13/89) ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. VIEW OF EQUIPMENT BURNED IN A TITANIUM FIRE. (11/13/89) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  15. 49 CFR 193.2611 - Fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Fire protection. 193.2611 Section 193.2611 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  16. Kerosene-Fuel Engine Testing Under Way

    NASA Image and Video Library

    2003-11-17

    NASA Stennis Space Center engineers conducted a successful cold-flow test of an RS-84 engine component Sept. 24. The RS-84 is a reusable engine fueled by rocket propellant - a special blend of kerosene - designed to power future flight vehicles. Liquid oxygen was blown through the RS-84 subscale preburner to characterize the test facility's performance and the hardware's resistance. Engineers are now moving into the next phase, hot-fire testing, which is expected to continue into February 2004. The RS-84 engine prototype, developed by the Rocketdyne Propulsion and Power division of The Boeing Co. of Canoga Park, Calif., is one of two competing Rocket Engine Prototype technologies - a key element of NASA's Next Generation Launch Technology program.

  17. Kerosene-Fuel Engine Testing Under Way

    NASA Technical Reports Server (NTRS)

    2003-01-01

    NASA Stennis Space Center engineers conducted a successful cold-flow test of an RS-84 engine component Sept. 24. The RS-84 is a reusable engine fueled by rocket propellant - a special blend of kerosene - designed to power future flight vehicles. Liquid oxygen was blown through the RS-84 subscale preburner to characterize the test facility's performance and the hardware's resistance. Engineers are now moving into the next phase, hot-fire testing, which is expected to continue into February 2004. The RS-84 engine prototype, developed by the Rocketdyne Propulsion and Power division of The Boeing Co. of Canoga Park, Calif., is one of two competing Rocket Engine Prototype technologies - a key element of NASA's Next Generation Launch Technology program.

  18. Special report. Revising your fire safety plans.

    PubMed

    1993-12-01

    Every hospital has a fire safety plan, although some fail to update their plans when circumstances change, such as when the facility is refurbished or new fire protection equipment is added, or when new wings bring in additional patients and staff. Others may fail to develop new education programs to heighten staff awareness of what is expected of them during a fire and to train employees to meet those expectations. In this report, we'll examine the new fire safety plans at two Massachusetts hospitals and the revisions they made to address these issues. We'll offer suggestions for effectively evaluating and revising your own fire safety plans.

  19. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  20. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  1. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  2. 33 CFR 6.14-1 - Safety measures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., may prescribe such conditions and restrictions relating to the safety of waterfront facilities and... of, and fire-prevention measures for, such vessels and waterfront facilities. [EO 10277, 16 FR 7541...

  3. Numerical Simulations of Instabilities in Single-Hole Office Elements

    NASA Technical Reports Server (NTRS)

    Ahuja, Vineet; Hosangadi, Ashvin; Hitt, Matthew A.; Lineberry, David M.

    2013-01-01

    An orifice element is commonly used in liquid rocket engine test facilities either as a flow metering device, a damper for acoustic resonance or to provide a large reduction in pressure over a very small distance in the piping system. While the orifice as a device is largely effective in stepping down pressure, it is also susceptible to a wake-vortex type instability that generates pressure fluctuations that propagate downstream and interact with other elements of the test facility resulting in structural vibrations. Furthermore in piping systems an unstable feedback loop can exist between the vortex shedding and acoustic perturbations from upstream components resulting in an amplification of the modes convecting downstream. Such was the case in several tests conducted at NASA as well as in the Ariane 5 strap-on P230 engine in a static firing test where pressure oscillations of 0.5% resulted in 5% thrust oscillations. Exacerbating the situation in cryogenic test facilities, is the possibility of the formation of vapor clouds when the pressure in the wake falls below the vapor pressure leading to a cavitation instability that has a lower frequency than the primary wake-vortex instability. The cavitation instability has the potential for high amplitude fluctuations that can cause catastrophic damage in the facility. In this paper high-fidelity multi-phase numerical simulations of an orifice element are used to characterize the different instabilities, understand the dominant instability mechanisms and identify the tonal content of the instabilities.

  4. Figures of Merit for Aeronautics Programs and Addition to NASA LARC Fire Station

    NASA Technical Reports Server (NTRS)

    Harper, Belinda M.

    1995-01-01

    This report accounts details of two research projects for the Langley Aerospace Research Summer Scholars (LARSS) program. The first project, with the Office of Mission Assurance, involved subjectively predicting the probable success of two aeronautics programs by means of a tool called a Figure of Merit. The figure of merit bases program success on the quality and reliability of the following factors: parts, complexity of research, quality programs, hazards elimination, and single point failures elimination. The second project, for the Office of Safety and Facilities Assurance, required planning, layouts, and source seeking for an addition to the fire house. Forecasted changes in facility layout necessitate this addition which will serve as housing for the fire fighters.

  5. Optical bullet-tracking algorithms for weapon localization in urban environments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roberts, R S; Breitfeller, E F

    2006-03-31

    Localization of the sources of small-arms fire, mortars, and rocket propelled grenades is an important problem in urban combat. Weapons of this type produce characteristic signatures, such as muzzle flashes, that are visible in the infrared. Indeed, several systems have been developed that exploit the infrared signature of muzzle flash to locate the positions of shooters. However, systems based on muzzle flash alone can have difficulty localizing weapons if the muzzle flash is obscured or suppressed. Moreover, optical clutter can be problematic to systems that rely on muzzle flash alone. Lawrence Livermore National Laboratory (LLNL) has developed a projectile trackingmore » system that detects and localizes sources of small-arms fire, mortars and similar weapons using the thermal signature of the projectile rather than a muzzle flash. The thermal signature of a projectile, caused by friction as the projectile travels along its trajectory, cannot be concealed and is easily discriminated from optical clutter. The LLNL system was recently demonstrated at the MOUT facility of the Aberdeen Test Center [1]. In the live-fire demonstration, shooters armed with a variety of small-arms, including M-16s, AK-47s, handguns, mortars and rockets, were arranged at several positions in around the facility. Experiments ranged from a single-weapon firing a single-shot to simultaneous fire of all weapons on full automatic. The LLNL projectile tracking system was demonstrated to localize multiple shooters at ranges up to 400m, far greater than previous demonstrations. Furthermore, the system was shown to be immune to optical clutter that is typical in urban combat. This paper describes the image processing and localization algorithms designed to exploit the thermal signature of projectiles for shooter localization. The paper begins with a description of the image processing that extracts projectile information from a sequence of infrared images. Key to the processing is an adaptive spatio-temporal filter developed to suppress scene clutter. The filtered image sequence is further processed to produce a set of parameterized regions, which are classified using several discriminate functions. Regions that are classified as projectiles are passed to a data association algorithm that matches features from these regions with existing tracks, or initializes new tracks as needed. A Kalman filter is used to smooth and extrapolate existing tracks. Shooter locations are determined by solving a combinatorial least-squares solution for all bullet tracks. It also provides an error ellipse for each shooter, quantifying the uncertainty of shooter location. The paper concludes with examples from the live-fire exercise at the Aberdeen Test Center.« less

  6. Medicare and Medicaid programs; fire safety requirements for long term care facilities, automatic sprinkler systems. Final rule.

    PubMed

    2008-08-13

    This final rule requires all long term care facilities to be equipped with sprinkler systems by August 13, 2013. Additionally, this final rule requires affected facilities to maintain their automatic sprinkler systems once they are installed.

  7. Emissions of PCDD and PCDF from combustion of forest fuels and sugarcane: a comparison between field measurements and simulations in a laboratory burn facility.

    PubMed

    Black, R R; Meyer, C P; Touati, A; Gullett, B K; Fiedler, H; Mueller, J F

    2011-05-01

    Release of PCDD and PCDF from biomass combustion such as forest and agricultural crop fires has been nominated as an important source for these chemicals despite minimal characterisation. Available emission factors that have been experimentally determined in laboratory and field experiments vary by several orders of magnitude from <0.5 μg TEQ (t fuel consumed)(-1) to >100 μg TEQ (t fuel consumed)(-1). The aim of this study was to evaluate the effect of experimental methods on the emission factor. A portable field sampler was used to measure PCDD/PCDF emissions from forest fires and the same fuel when burnt over a brick hearth to eliminate potential soil effects. A laboratory burn facility was used to sample emissions from the same fuels. There was very good agreement in emission factors to air (EF(Air)) for forest fuel (Duke Forest, NC) of 0.52 (range: 0.40-0.79), 0.59 (range: 0.18-1.2) and 0.75 (range: 0.27-1.2) μg TEQ(WHO2005) (t fuel consumed)(-1) for the in-field, over a brick hearth, and burn facility experiments, respectively. Similarly, experiments with sugarcane showed very good agreement with EF(Air) of 1.1 (range: 0.40-2.2), 1.5 (range: 0.84-2.2) and 1.7 (range: 0.34-4.4) μg TEQ (t fuel consumed)(-1) for in-field, over a brick hearth, open field and burn facility experiments respectively. Field sampling and laboratory simulations were in good agreement, and no significant changes in emissions of PCDD/PCDF could be attributed to fuel storage and transport to laboratory test facilities. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. Comparative Soot Diagnostics: 1 Year Report

    NASA Technical Reports Server (NTRS)

    Urban, David L.; Griffin, DeVon W.; Gard, Melissa Y.

    1998-01-01

    The motivation for the Comparative Soot Diagnostics (CSD) experiment lies in the broad practical importance of understanding combustion generated particulate. Depending upon the circumstances, particulate matter can affect the durability and performance of combustion equipment, can be a pollutant, can be used to detect fires and, in the form of soot, can be the dominant source of radiant energy from flames. Bright sooty fires are desirable for efficient energy extraction in furnaces and power equipment. In contrast, soot-enhanced radiation is undesirable in many propulsion systems (e.g. jet engines). The non-buoyant structure of most flames of practical interest (turbulent) makes understanding of soot processes in low gravity flames important to our ability to predict fire behavior on earth. These studies also have direct applications to fire safety in human-crew spacecraft, since smoke is the indicator used for automated detection in current spacecraft. In addition, recent tests conducted on MIR showed that a candle in a truly quiescent spacecraft environment can burn for tens of minutes. Consequently, this test and many earlier tests have demonstrated that fires in spacecraft can be considered a credible risk. In anticipation of this risk, NASA has included fire detectors on Skylab, smoke detectors on the Space Shuttle (STS), and smoke detectors in the design for the International Space Station (ISS). In the CSD experiment, these smoke detectors were tested using, quasi-steady, low-gravity, particulate generating materials. Samples of the particulate were also obtained from these low-gravity sources. This experiment provides the first such measurements aimed toward understanding of soot processes here on earth and for the testing and design of advanced spacecraft smoke detection systems. This paper describes the operation and preliminary results of the CSD experiment which was was conducted in the Middeck Glovebox Facility (MGBX) on USMP-3. The objectives of CSD are to examine the particulate emission from a variety of pyrolyzing and combusting sources and to quantify the performance of several particulate-sensing diagnostic techniques. This paper presents the results of the microgravity portion of the CSD experiment. The results include the temporal response of the detectors and average sizes of the primary and aggregate particles captured on the thermophoretic probes. Complete assessment of the microgravity data and its combination with the normal-gravity data are still in process.

  9. Fire protection review revisit no. 2, Argonne National Laboratory, Argonne, Illinois

    NASA Astrophysics Data System (ADS)

    Dobson, P. H.; Earley, M. W.; Mattern, L. J.

    1985-05-01

    A fire protection survey was conducted at Argonne National Laboratory on April 1-5, 8-12, and April 29-May 2, 1985. The purpose was to review the facility fire protection program and to make recommendations or identify areas according to criteria established by the Department of Energy. There has been a substantial improvement in fire protection at this laboratory since the 1977 audit. Numerous areas which were previously provided with detection systems only have since been provided with automatic sprinkler protection. The following basic fire protection features are not properly controlled: (1) resealing wall and floor penetrations between fire areas after installation of services; (2) cutting and welding; and (3) housekeeping. The present Fire Department manpower level appears adequate to control a route fire. Their ability to adequately handle a high-challenge fire, or one involving injuries to personnel, or fire spread beyond the initial fire area is doubtful.

  10. Compliance with Electrical and Fire Protection Standards of U.S. Controlled and Occupied Facilities in Afghanistan

    DTIC Science & Technology

    2013-07-18

    are subject to damage and abrasion (figure 5). The use of an extension cord instead of fixed wiring creates the possibility of fire , electrical shock...Medical Clinic has an adjacent warehouse that is of a higher hazard and is not separated by 1-hour fire resistance rated construction. KMC 17-May...higher hazard and is not separated by 1-hour fire resistance rated construction. DynCorp NO Awaiting USG Decision DI has not received governmental

  11. KSC-04pd2086

    NASA Image and Video Library

    2004-10-05

    KENNEDY SPACE CENTER, FLA. - Inside the KSC Engine Shop, Boeing-Rocketdyne technicians attach an overhead crane to the container enclosing the third Space Shuttle Main Engine for Discovery’s Return to Flight mission STS-114 arrives at the KSC Engine Shop aboard a trailer. The engine is returning from NASA’s Stennis Space Center in Mississippi where it underwent a hot fire acceptance test. Typically, the engines are installed on an orbiter in the Orbiter Processing Facility approximately five months before launch.

  12. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    NASA Ares I-X Assistant Launch Director Pete Nickolenko, left, and NASA Ares I-X Launch Director Ed Mango monitor the launch countdown from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the planned launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  13. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Constellation Program manager Jeff Hanley, Ares I-X Launch Director Ed Mango, Ares I-X mission manager Bob Ess, Ground Operations Manager Philip "Pepper" Phillips, review the latest data in Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  14. ARES I-X Launch Prep

    NASA Image and Video Library

    2009-10-26

    Mission managers, from left, NASA Ares I-X Assistant Launch Director Pete Nickolenko, Ground Operations Manager Philip "Pepper" Phillips, Ares I-X Launch Director Ed Mango, and Constellation Program manager Jeff Hanley review the latest weather radar from Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center during the launch countdown of the Ares I-X rocket in Cape Canaveral, Fla., Tuesday, Oct. 27, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  15. ARES I-X Launch

    NASA Image and Video Library

    2009-10-27

    NASA Ares I-X Launch Director Ed Mango, left, laughs as NASA Ares I-X Assistant Launch Director Pete Nickolenko looks out the window of Firing Room One of the Launch Control Center (LCC) at the Kennedy Space Center prior to the launch of the Ares I-X rocket from pad 39b at the Kennedy Space Center in Cape Canaveral, Fla., Wednesday, Oct. 28, 2009. The flight test of Ares I-X will provide NASA with an early opportunity to test and prove flight characteristics, hardware, facilities and ground operations associated with the Ares I. Photo Credit: (NASA/Bill Ingalls)

  16. KSC-2013-4164

    NASA Image and Video Library

    2013-11-20

    VAN HORN, Texas – Blue Origin’s test stand, back right, is framed by a wind mill at the company’s West Texas facility. The company used this test stand to fire its powerful new hydrogen- and oxygen-fueled American rocket engine, the BE-3. The engine fired at full power for more than two minutes to simulate a launch, then paused for about four minutes, mimicking a coast through space before it re-ignited for a brief final burn. The last phase of the test covered the work the engine could perform in landing the booster back softly on Earth. Blue Origin, a partner of NASA’s Commercial Crew Program, or CCP, is developing its Orbital Launch Vehicle, which could eventually be used to launch the company's Space Vehicle into orbit to transport crew and cargo to low-Earth orbit. CCP is aiding in the innovation and development of American-led commercial capabilities for crew transportation and rescue services to and from the station and other low-Earth orbit destinations by the end of 2017. For information about CCP, visit www.nasa.gov/commercialcrew. Photo credit: NASA/Lauren Harnett

  17. KSC-2013-4197

    NASA Image and Video Library

    2013-11-20

    VAN HORN, Texas – The sun sets over a test stand at Blue Origin’s West Texas facility. The company used this test stand to fire its powerful new hydrogen- and oxygen-fueled American rocket engine, the BE-3, on Nov. 20. The BE-3 fired at full power for more than two minutes to simulate a launch, then paused for about four minutes, mimicking a coast through space before it re-ignited for a brief final burn. The last phase of the test covered the work the engine could perform in landing the booster back softly on Earth. Blue Origin, a partner of NASA’s Commercial Crew Program, or CCP, is developing its Orbital Launch Vehicle, which could eventually be used to launch the company's Space Vehicle into orbit to transport crew and cargo to low-Earth orbit. CCP is aiding in the innovation and development of American-led commercial capabilities for crew transportation and rescue services to and from the station and other low-Earth orbit destinations by the end of 2017. For information about CCP, visit www.nasa.gov/commercialcrew. Photo credit: NASA/Lauren Harnett

  18. RS-88 Pad Abort Demonstrator Thrust Chamber Assembly Testing at NASA Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Farr, Rebecca A.; Sanders, Timothy M.

    1990-01-01

    This paper documents the effort conducted to collect hot-tire dynamic and acoustics environments data during 50,000-lb thrust lox-ethanol hot-fire rocket testing at NASA Marshall Space Flight Center (MSFC) in November-December 2003. This test program was conducted during development testing of the Boeing Rocketdyne RS-88 development engine thrust chamber assembly (TCA) in support of the Orbital Space Plane (OSP) Crew Escape System Propulsion (CESP) Program Pad Abort Demonstrator (PAD). In addition to numerous internal TCA and nozzle measurements, induced acoustics environments data were also collected. Provided here is an overview of test parameters, a discussion of the measurements, test facility systems and test operations, and a quality assessment of the data collected during this test program.

  19. Power Systems Development Facility Gasification Test Campaing TC18

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Southern Company Services

    2005-08-31

    In support of technology development to utilize coal for efficient, affordable, and environmentally clean power generation, the Power Systems Development Facility (PSDF) located in Wilsonville, Alabama, routinely demonstrates gasification technologies using various types of coals. The PSDF is an engineering scale demonstration of key features of advanced coal-fired power systems, including a KBR Transport Gasifier, a hot gas particulate control device (PCD), advanced syngas cleanup systems, and high pressure solids handling systems. This report details Test Campaign TC18 of the PSDF gasification process. Test campaign TC18 began on June 23, 2005, and ended on August 22, 2005, with the gasifiermore » train accumulating 1,342 hours of operation using Powder River Basin (PRB) subbituminous coal. Some of the testing conducted included commissioning of a new recycle syngas compressor for gasifier aeration, evaluation of PCD filter elements and failsafes, testing of gas cleanup technologies, and further evaluation of solids handling equipment. At the conclusion of TC18, the PSDF gasification process had been operated for more than 7,750 hours.« less

  20. Evaluating measurements of carbon dioxide emissions using a precision source--A natural gas burner.

    PubMed

    Bryant, Rodney; Bundy, Matthew; Zong, Ruowen

    2015-07-01

    A natural gas burner has been used as a precise and accurate source for generating large quantities of carbon dioxide (CO2) to evaluate emissions measurements at near-industrial scale. Two methods for determining carbon dioxide emissions from stationary sources are considered here: predicting emissions based on fuel consumption measurements-predicted emissions measurements, and direct measurement of emissions quantities in the flue gas-direct emissions measurements. Uncertainty for the predicted emissions measurement was estimated at less than 1%. Uncertainty estimates for the direct emissions measurement of carbon dioxide were on the order of ±4%. The relative difference between the direct emissions measurements and the predicted emissions measurements was within the range of the measurement uncertainty, therefore demonstrating good agreement. The study demonstrates how independent methods are used to validate source emissions measurements, while also demonstrating how a fire research facility can be used as a precision test-bed to evaluate and improve carbon dioxide emissions measurements from stationary sources. Fossil-fuel-consuming stationary sources such as electric power plants and industrial facilities account for more than half of the CO2 emissions in the United States. Therefore, accurate emissions measurements from these sources are critical for evaluating efforts to reduce greenhouse gas emissions. This study demonstrates how a surrogate for a stationary source, a fire research facility, can be used to evaluate the accuracy of measurements of CO2 emissions.

  1. Influence of weather factors on moisture content of light fuels in forests of the northern Rocky Mountains

    Treesearch

    George M. Jemison

    1935-01-01

    The necessity of forest-fire protection is generally recognized in the United Slates. The tremendous damage done by forest fires each year to valuable timber, watershed cover, forest range, wildlife, recreational facilities, and personal property has impressed upon the people the need for preventing and controlling forest fires so far as this is humanly possible.

  2. Credit BG. Test Stand "D" tower as seen looking northeast ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. Test Stand "D" tower as seen looking northeast (See caption for CA-163-F-18). To the right of the view is the stainless steel dome top for Dv Cell (see CA-163-F-22 for view into cell), behind which rests a spherical accumulator--an electrically heated steam generator for powering the vacuum system at "C" and Test Stand "D." Part of the ejector system can be seen on the right corner of the tower, other connections include electrical ducts (thin, flat metal members) and fire protection systems. Note the stand in the foreground with lights used to indicate safety status of the stand during tests - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  3. 24 CFR 232.615 - Eligible borrowers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... intermediate care facility for which the Secretary of Health and Human Services has determined that the... intermediate care facility will meet not only the applicable fire safety requirements of HHS but will meet... application, a nursing home or intermediate care facility need not be providing such services if upon...

  4. Counting the cost of false alarms.

    PubMed

    2013-05-01

    While fire and rescue service personnel, the Government, those responsible for fire safety in the healthcare sector, the Health and Safety Executive, fire and rescue services, and indeed fire alarm and detection equipment manufacturers, must be pleased that the number of false fire alarms continues to fall, fire services still attended just under 585,000 fires or false alarm incidents across Great Britain in 2011/12. Of this total, 272,000 were actual fires, of which around 24,000 were in premises classified by the Department for Communities and Local Government (DCLG) as 'other buildings', i.e. not 'dwellings', a category that includes healthcare facilities (representing a 4% fall on 2010-2011). HEJ looks behind the statistics, and at the possibility that some fire services could, in future, charge healthcare providers that persistently report incidents that turn out to be false alarms.

  5. Terahop and Lawrence Livermore National LaboratoryStructural Fire RF Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haugen, P; Pratt, G

    The Georgia Public Safety Training Center's Live Fire Training Facility in Forsyth, GA is a three story structure constructed of rebar-reinforced concrete wall and floors. All the door and window coverings on the building are constructed of thick, plate metal to withstand the high temperatures generated inside the building during training exercises. All of the building's walls and floors are 1-foot thick, and regular concrete columns run up along the inside of the wall increasing the thickness to 20-inches in those locations. A center concrete staircase divides the structure in half. For typical exercises, fires are started in the backmore » right corner of the building on the first floor and in the front right corner on the second floor as shown in Figure 2. Due to the high heat generated during these exercises, measured at 300 F on the floor and 700 F near the ceilings, there were limited locations at which equipment could be placed that did not incorporate heat shielding, such as the Lawrence Livermore National Laboratory's UWB system. However, upon inspection of the building, two preferable locations were identified in which equipment could be placed that would be protected from the temperature extremes generated by the fires. These locations are identified in Figure 2 as the tested TX locations. These were preferred locations because, while they protected the hardware from temperature extremes, they also force the RF transmission path through the building to cross very near the fire locations and anticipated plasma generation regions. Both of the locations listed in Figure 2 were tested by the UWB equipment and found to be suitable deployment locations to establish a solid RF link for data collection. The transmission location on the first floor was ultimately chosen for use during the actual exercises because it was accessible to the data collection team during the exercises. This allowed them to remove the hardware once the testing was complete without having to wait for the entire day of exercises to complete. Unfortunately, RF transmission directly through the central location of the fire on the first floor was not possible, so the transmission path had to be shifted approximately 6-feet off the side of the fire's center. The corner where the fire was located on the first floor was re-enforced with a mixture of concrete and metal fibers for heat resistance. This material was highly reflective, permitting very little RF energy to pass through it. This phenomenon was also observed and verified by Terahop's testing, discussed in the next section. An image of these re-enforced walls and a close up of the actual wall material containing the metal fibers can bee seen in Figure 3.« less

  6. Chemical Safety Alert: Fire Hazard from Carbon Adsorption Deodorizing Systems

    EPA Pesticide Factsheets

    Activated carbon systems used to adsorb vapors for odor control may pose a fire hazard when used for certain types of substances, such as crude sulfate turpentine. Facilities should take precautions and proper procedures to avoid or mitigate these hazards.

  7. 30 CFR 57.4430 - Surface storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....4430 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention... ignition sources to prevent fire or explosion; and (4) Vented or otherwise constructed to prevent...

  8. 30 CFR 56.4430 - Storage facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Fire Prevention and... separated from ignition sources to prevent fire or explosion; and (4) Vented or otherwise constructed to...

  9. PBF Control Building auxiliary features, including fire hose house and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PBF Control Building auxiliary features, including fire hose house and sewage system. Ebasco Services 1205 PER/PER-A-4. INEEL undex no. 760-0619-00-205-123024 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID

  10. Full-scale aircraft cabin flammability tests of improved fire-resistant materials, test series 2

    NASA Technical Reports Server (NTRS)

    Stuckey, R. N.; Bricker, R. W.; Kuminecz, J. F.; Supkis, D. E.

    1976-01-01

    Full-scale aircraft flammability tests in which the effectiveness of new fire-resistant materials was evaluated by comparing their burning characteristics with those of other fire-resistant aircraft materials were described. New-fire-resistant materials that are more economical and better suited for aircraft use than the previously tested fire-resistant materials were tested. The fuel ignition source for one test was JP-4; a smokeless fuel was used for the other test. Test objectives, methods, materials, and results are presented and discussed. The results indicate that, similar to the fire-resistant materials tested previously, the new materials decompose rather than ignite and do not support fire propagation. Furthermore, the new materials did not produce a flash fire.

  11. Long-term post-fire effects on spatial ecology and reproductive output of female Agassiz’s desert tortoises (Gopherus agassizii) at a wind energy facility near Palm Springs, California, USA

    USGS Publications Warehouse

    Lovich, Jeffrey E.; Ennen, Joshua R.; Madrak, Sheila V.; Loughran, Caleb L.; Meyer, Katherin P.; Arundel, Terence R.; Bjurlin, Curtis D.

    2011-01-01

    We studied the long-term response of a cohort of eight female Agassiz’s desert tortoises (Gopherus agassizii) during the first 15 years following a large fire at a wind energy generation facility near Palm Springs, California, USA. The fire burned a significant portion of the study site in 1995. Tortoise activity areas were mapped using minimum convex polygons for a proximate post-fire interval from 1997 to 2000, and a long-term post-fire interval from 2009 to 2010. In addition, we measured the annual reproductive output of eggs each year and monitored the body condition of tortoises over time. One adult female tortoise was killed by the fire and five tortoises bore exposure scars that were not fatal. Despite predictions that tortoises would make the short-distance movements from burned to nearby unburned habitats, most activity areas and their centroids remained in burned areas for the duration of the study. The percentage of activity area burned did not differ significantly between the two monitoring periods. Annual reproductive output and measures of body condition remained statistically similar throughout the monitoring period. Despite changes in plant composition, conditions at this site appeared to be suitable for survival of tortoises following a major fire. High productivity at the site may have buffered tortoises from the adverse impacts of fire if they were not killed outright. Tortoise populations at less productive desert sites may not have adequate resources to sustain normal activity areas, reproductive output, and body conditions following fire.

  12. Fires at storage sites of organic materials, waste fuels and recyclables.

    PubMed

    Ibrahim, Muhammad Asim; Alriksson, Stina; Kaczala, Fabio; Hogland, William

    2013-09-01

    During the last decade, the European Union has enforced the diversion of organic wastes and recyclables to waste management companies operating incineration plants, composting plants and recycling units instead of landfills. The temporary storage sites have been established as a buffer against fluctuations in energy demand throughout the year. Materials also need to be stored at temporary storage sites before recovery and recycling. However, regulations governing waste fuel storage and handling have not yet been developed, and, as a result, companies have engaged in risky practices that have resulted in a high number of fire incidents. In this study, a questionnaire survey was distributed to 249 of the 400 members of Avfall Sverige (Swedish Waste Management Association), which represents the waste management of 95% of the Swedish population. Information regarding 122 storage facilities owned by 69 companies was obtained; these facilities were responsible for the storage of 47% of the total treated waste (incineration + digestion + composting) in 2010 in Sweden. To identify factors related to fire frequency, the questionnaire covered the amounts of material handled and burnt per year, financial losses due to fires, storage duration, storage method and types of waste. The results show that 217 fire incidents corresponded to 170 kilotonnes of material burnt and cumulative losses of 49 million SEK (€4.3 million). Fire frequency and amount of material burnt per fire was found to be dependent upon type of management group (waste operator). Moreover, a correlation was found between fire frequency and material recycled during past years. Further investigations of financial aspects and externalities of fire incidents are recommended.

  13. Pinon Pine power project nears start-up

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tatar, G.A.; Gonzalez, M.; Mathur, G.K.

    1997-12-31

    The IGCC facility being built by Sierra Pacific Power Company (SPPCo) at their Tracy Station in Nevada is one of three IGCC facilities being cost-shared by the US Department of Energy (DOE) under their Clean Coal Technology Program. The specific technology to be demonstrated in SPPCo`s Round Four Project, known as the Pinon Pine IGCC Project, includes the KRW air blown pressurized fluidized bed gasification process with hot gas cleanup coupled with a combined cycle facility based on a new GE 6FA gas turbine. Construction of the 100 MW IGCC facility began in February 1995 and the first firing ofmore » the gas turbine occurred as scheduled on August 15, 1996 with natural gas. Mechanical completion of the gasifier and other outstanding work is due in January 1997. Following the startup of the plant, the project will enter a 42 month operating and testing period during which low sulfur western and high sulfur eastern or midwestern coals will be processed.« less

  14. Commercialization Development of Oxygen Fired CFB for Greenhouse Gas Control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nsakala ya Nsakala; Gregory N. Liljedahl; David G. Turek

    2007-03-31

    Given that fossil fuel fired power plants are among the largest and most concentrated producers of CO{sub 2} emissions, recovery and sequestration of CO{sub 2} from the flue gas of such plants has been identified as one of the primary means for reducing anthropogenic (i.e., man-made) CO{sub 2} emissions. In 2001, ALSTOM Power Inc. (ALSTOM) began a two-phase program to investigate the feasibility of various carbon capture technologies. This program was sponsored under a Cooperative Agreement from the US Department of Energy's National Energy Technology Laboratory (DOE). The first phase entailed a comprehensive study evaluating the technical feasibility and economicsmore » of alternate CO{sub 2} capture technologies applied to Greenfield US coal-fired electric generation power plants. Thirteen cases, representing various levels of technology development, were evaluated. Seven cases represented coal combustion in CFB type equipment. Four cases represented Integrated Gasification Combined Cycle (IGCC) systems. Two cases represented advanced Chemical Looping Combined Cycle systems. Marion, et al. reported the details of this work in 2003. One of the thirteen cases studied utilized an oxygen-fired circulating fluidized bed (CFB) boiler. In this concept, the fuel is fired with a mixture of oxygen and recirculated flue gas (mainly CO{sub 2}). This combustion process yields a flue gas containing over 80 percent (by volume) CO{sub 2}. This flue gas can be processed relatively easily to enrich the CO{sub 2} content to over 96 percent for use in enhanced oil or gas recovery (EOR or EGR) or simply dried for sequestration. The Phase I study identified the O{sub 2}-fired CFB as having a near term development potential, because it uses conventional commercial CFB technology and commercially available CO{sub 2} capture enabling technologies such as cryogenic air separation and simple rectification or distillation gas processing systems. In the long term, air separation technology advancements offer significant reductions in power requirements, which would improve plant efficiency and economics for the oxygen-fired technology. The second phase consisted of pilot-scale testing followed by a refined performance and economic evaluation of the O{sub 2} fired CFB concept. As a part of this workscope, ALSTOM modified its 3 MW{sub th} (9.9 MMBtu/hr) Multiuse Test Facility (MTF) pilot plant to operate with O{sub 2}/CO{sub 2} mixtures of up to 70 percent O{sub 2} by volume. Tests were conducted with coal and petroleum coke. The test objectives were to determine the impacts of oxygen firing on heat transfer, bed dynamics, potential agglomeration, and gaseous and particulate emissions. The test data results were used to refine the design, performance, costs, and economic models developed in Phase-I for the O{sub 2}-fired CFB with CO{sub 2} capture. Nsakala, Liljedahl, and Turek reported results from this study in 2004. ALSTOM identified several items needing further investigation in preparation for large scale demonstration of the oxygen-fired CFB concept, namely: (1) Operation and performance of the moving bed heat exchanger (MBHE) to avoid recarbonation and also for cost savings compared to the standard bubbling fluid bed heat exchanger (FBHE); (2) Performance of the back-end flash dryer absorber (FDA) for sulfur capture under high CO{sub 2}/high moisture flue gas environment using calcined limestone in the fly ash and using fresh commercial lime directly in the FDA; (3) Determination of the effect of recarbonation on fouling in the convective pass; (4) Assessment of the impact of oxygen firing on the mercury, other trace elements, and volatile organic compound (VOC) emissions; and (5) Develop a proposal-level oxygen-fired retrofit design for a relatively small existing CFB steam power plant in preparation for a large-scale demonstration of the O{sub 2} fired CFB concept. Hence, ALSTOM responded to a DOE Solicitation to address all these issues with further O{sub 2} fired MTF pilot testing and a subsequent retrofit design study of oxygen firing and CO{sub 2} capture on an existing air-fired CFB plant. ALSTOM received a contract award from the DOE to conduct a project entitled 'Commercialization Development of Oxygen Fired CFB for Greenhouse Gas Control', under Cooperative Agreement DE-FC26-04NT42205 that is the subject of this topical report.« less

  15. 24 CFR 3280.209 - Fire testing.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 5 2011-04-01 2011-04-01 false Fire testing. 3280.209 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Fire Safety § 3280.209 Fire testing. All fire testing conducted in accordance with this subpart shall be performed by nationally recognized testing...

  16. 24 CFR 3280.209 - Fire testing.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 5 2012-04-01 2012-04-01 false Fire testing. 3280.209 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Fire Safety § 3280.209 Fire testing. All fire testing conducted in accordance with this subpart shall be performed by nationally recognized testing...

  17. 24 CFR 3280.209 - Fire testing.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Fire testing. 3280.209 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Fire Safety § 3280.209 Fire testing. All fire testing conducted in accordance with this subpart shall be performed by nationally recognized testing...

  18. 24 CFR 3280.209 - Fire testing.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 5 2013-04-01 2013-04-01 false Fire testing. 3280.209 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Fire Safety § 3280.209 Fire testing. All fire testing conducted in accordance with this subpart shall be performed by nationally recognized testing...

  19. Risk management of liquefied natural gas installations

    NASA Technical Reports Server (NTRS)

    Fedor, O. H.; Parsons, W. N.; Coutinho, J. De C.

    1976-01-01

    In connection with the construction of four major liquefied natural gas (LNG) facilities in New York City, the New York City Fire Commissioner has asked NASA for assistance. It was decided that the Kennedy Space Center should develop a risk management system (RMS) for the use of the New York Fire Department (NYFD). The RMS provides for a published set of safety regulations by the NYFD. A description of the RMS is presented as an example of an application of aerospace technology to a civilian sector, namely LNG facilities.

  20. Secondary Fire Analysis.

    DTIC Science & Technology

    1981-09-01

    of wood frame and brick veneer, slab on grade construction), killed 33, injured more than 1,000, derailed a train, destroyed 4,000 cars, uprooted most... of a nuclear detonation) in or near structures, with emphasis on critical facil- ities and industries. Assessment of the potential for secondary fires...and/or 517 East Dayshore, Redwood City, CA 94063 DistI pial (DETACHABLE SUMMARY) SECONDARY FIRE ANALYSIS This report presents the results of a

  1. UNC Pembroke Laser Scanning Confocal Microscopy Facility

    DTIC Science & Technology

    2016-04-29

    cultures. INVASIVE FIRE ANTS Professor Lisa Kelly of UNC Pembroke has been trained on the new confocal system. Dr. Kelly’s research...interest in the trophic ecology of the invasive fire ant has begun to benefit from the wide field view and long working distances of a confocal imaging...of protein clearance pathways in living brain tissue cultures. INVASIVE FIRE ANTS Professor Lisa Kelly of UNC Pembroke has been trained on

  2. Testing Method for External Cladding Systems - Incerc Romania

    NASA Astrophysics Data System (ADS)

    Simion, A.; Dragne, H.

    2017-06-01

    This research presents a new testing method in a natural scale for external cladding systems tested on buildings with minimum than 3 floors [1]. The testing method is unique in Romania and it is similar about many fire testing current methods from European Union states. Also, presents the fire propagation and the effect of fire smoke on the building façade composed of thermal insulation. Laboratory of testing and research for building fire safety from National Institute INCERC Bucharest, provides a test method for determining the fire performance characteristics of non-loadbearing external cladding systems and external wall insulation systems when applied to the face of a building and exposed to an external fire under controlled conditions [2]. The fire exposure is representative of an external fire source or a fully-developed (post-flashover) fire in a room, venting through an opening such as a window aperture that exposes the cladding to the effects of external flames, or an external fire source. On the future, fire tests will be experimented for answer demande a number of high-profile fires where the external facade of tall buildings provided a route for vertical fire spread.

  3. 30 CFR 75.1103-11 - Tests of fire hydrants and fire hose; record of tests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Tests of fire hydrants and fire hose; record of tests. 75.1103-11 Section 75.1103-11 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1103-11 Tests of fire hydrants and...

  4. 30 CFR 75.1103-11 - Tests of fire hydrants and fire hose; record of tests.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Tests of fire hydrants and fire hose; record of tests. 75.1103-11 Section 75.1103-11 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1103-11 Tests of fire hydrants and...

  5. 30 CFR 75.1103-11 - Tests of fire hydrants and fire hose; record of tests.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Tests of fire hydrants and fire hose; record of tests. 75.1103-11 Section 75.1103-11 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1103-11 Tests of fire hydrants and...

  6. 30 CFR 75.1103-11 - Tests of fire hydrants and fire hose; record of tests.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Tests of fire hydrants and fire hose; record of tests. 75.1103-11 Section 75.1103-11 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1103-11 Tests of fire hydrants and...

  7. 30 CFR 75.1103-11 - Tests of fire hydrants and fire hose; record of tests.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Tests of fire hydrants and fire hose; record of tests. 75.1103-11 Section 75.1103-11 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Fire Protection § 75.1103-11 Tests of fire hydrants and...

  8. 76 FR 70352 - Approval and Promulgation of Implementation Plans; Reasonably Available Control Technology for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ... controlling oxides of nitrogen from the stationary reciprocating, diesel fuel fired, internal combustion... County. The facility contains two stationary reciprocating, diesel fuel fired, internal combustion... Conditions of Approval specify the NO X emissions limits, combustion process adjustments mentioned above...

  9. 75 FR 2481 - Sunshine Act; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... installation and commissioning of a new gas-fired industrial water heater, manufactured by Energy Systems... its investigation into a natural gas explosion that occurred at the ConAgra production facility in... consider urgent recommendations to the National Fire Protection Association (NFPA), the American Gas...

  10. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  11. 24 CFR 232.570 - Endorsement of credit instrument.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Eligible Security Instruments § 232.570 Endorsement of credit instrument.... (c) Statement by the Secretary of Health and Human Services that the fire safety equipment noted in...

  12. Take immediate action to protect communities and workers.

    PubMed

    Wilding, Roberta Chase; Lewis, Sharon E

    2007-01-01

    In many areas throughout America, thousands of industrial and military facilities and agricultural operations put large numbers of people at risk of serious injury or death due to accidental chemical releases, explosions, fires, and grossly inadequate occupational exposure standards. While some companies are moving toward "greener" production, many others do the minimum required by government agencies. As evidenced by the thousands of permit violations and accidental releases of hazardous chemicals, this means that facilities across the country consistently fail to meet regulations, incorporating the cost of fines and penalties into the cost of doing business and passing that cost on to consumers. Workers at such facilities and residents of the surrounding communities cannot wait for the eventual implementation and enforcement of federal environmental laws or adequate testing of the effect chemicals may have on the human population. Immediate action is needed to protect communities and workers at risk from chemical exposures that can compromise their health.

  13. PORTRAIT - PRIME AND BACKUP CREWS - ASTRONAUT EDWARD H. WHITE II

    NASA Image and Video Library

    1966-04-01

    S66-30236 (1 April 1966) --- The National Aeronautics and Space Administration (NASA) has named these astronauts as the prime crew of the first manned Apollo Space Flight. Left to right, are Edward H. White II, command module pilot; Virgil I. Grissom, mission commander; and Roger B. Chaffee, lunar module pilot. Editor's Note: Astronauts Grissom, White and Chaffee lost their lives in a Jan. 27, 1967 fire in the Apollo Command Module (CM) during testing at the launch facility.

  14. n/a

    NASA Image and Video Library

    1977-09-09

    The first Space Shuttle External Tank, the Main Propulsion Test Article (MPTA), rolls off the assembly line September 9, 1977 at the Michoud Assembly Facility in New Orleans. The MPTA was then transported to the National Space Technology Laboratories in southern Mississippi where it was used in the first static firing of the three main engines. Marshall Space Flight Center had management responsibility for Space Shuttle propulsion elements, including the External Tank. Martin Marietta was the prime contractor who designed and assembled the tanks at Michoud.

  15. The great Chinese fire of 1987 - A view from space

    NASA Technical Reports Server (NTRS)

    Cahoon, Donald R., Jr.; Levine, Joel S.; Cofer, Wesley R., III; Miller, James E.; Minnis, Patrick; Tennille, Geoffrey M.; Yip, Tommy W.; Stocks, Brian J.; Heck, Patrick W.

    1991-01-01

    One of the largest forest fires ever recorded burned in the People's Republic of China (PRC) and the Soviet Union in May 1987. The fire covered over 1.0 million hectares in the PRC and almost 4 million hectares in the Soviet Union. The progress and areal extent of the fire were measured using satellite images analyzed in the imaging facilities at NASA-Langley and Forestry Canada. The analyses show the utility and value of satellite measurements to assess the areal extent and geographical distribution of fires, and have important implications for future measurements to be obtained from space platforms, such as the Earth Observing System.

  16. Surgical fires: a patient safety perspective.

    PubMed

    2006-02-01

    A surgical fire is a fire that occurs on or in a surgical patient. Such fires are rare--they occur in only an extremely small percentage of surgical cases. Nevertheless, the actual number of incidents that occur each year may surprise many healthcare professionals. ECRI estimates that 50 to 100 or more surgical fires occur each year in the United States alone. And such fires can have devastating consequences, not only for the patient, but also for the surgical staff and for the healthcare facility. Fortunately, through awareness of the hazards-and with emphasis placed on following safe practices-virtually all surgical fires can be prevented. Thus, it's important that surgical fire safety be incorporated into formal patient safety initiatives. In this article, we describe a few surgical fire patient safety initiatives that have been instituted in recent years. In addition, we describe in detail the causes of surgical fires and the preventive measures that are available for healthcare personnel to follow. In addition, we review how staff should respond in the event of a surgical fire.

  17. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  18. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  19. 40 CFR 60.40b - Applicability and delegation of authority.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... applicability requirements under subpart D (Standards of performance for fossil-fuel-fired steam generators... meeting the applicability requirements under subpart D (Standards of performance for fossil-fuel-fired... fossil fuel. If the affected facility (i.e. heat recovery steam generator) is subject to this subpart...

  20. 77 FR 21595 - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-10

    ... must be one which, if proven, would entitle the requestor/petitioner to relief. A requestor/ petitioner..., and fire modeling calculations, have been performed to demonstrate that the performance-based... may include engineering evaluations, probabilistic safety assessments, and fire modeling calculations...

  1. 24 CFR 232.565 - Maximum loan amount.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Eligible Security Instruments § 232.565 Maximum loan amount. The principal amount of the loan shall not exceed the lower of the Commissioner's estimate of the cost of the fire safety...

  2. 24 CFR 232.630 - Assurance of completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Special Requirements § 232.630 Assurance of completion. If the property upon which the fire safety equipment is to be installed is subject to a mortgage insured or held by the...

  3. 30 CFR 77.1100 - Fire protection; training and organization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....1100 Section 77.1100 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF... facilities and equipment shall be provided commensurate with the potential fire hazards at each structure...

  4. A Burning Plasma Experiment: the role of international collaboration

    NASA Astrophysics Data System (ADS)

    Prager, Stewart

    2003-04-01

    The world effort to develop fusion energy is at the threshold of a new stage in its research: the investigation of burning plasmas. A burning plasma is self-heated. The 100 million degree temperature of the plasma is maintained by the heat generated by the fusion reactions themselves, as occurs in burning stars. The fusion-generated alpha particles produce new physical phenomena that are strongly coupled together as a nonlinear complex system, posing a major plasma physics challenge. Two attractive options are being considered by the US fusion community as burning plasma facilities: the international ITER experiment and the US-based FIRE experiment. ITER (the International Thermonuclear Experimental Reactor) is a large, power-plant scale facility. It was conceived and designed by a partnership of the European Union, Japan, the Soviet Union, and the United States. At the completion of the first engineering design in 1998, the US discontinued its participation. FIRE (the Fusion Ignition Research Experiment) is a smaller, domestic facility that is at an advanced pre-conceptual design stage. Each facility has different scientific, programmatic and political implications. Selecting the optimal path for burning plasma science is itself a challenge. Recently, the Fusion Energy Sciences Advisory Committee recommended a dual path strategy in which the US seek to rejoin ITER, but be prepared to move forward with FIRE if the ITER negotiations do not reach fruition by July, 2004. Either the ITER or FIRE experiment would reveal the behavior of burning plasmas, generate large amounts of fusion power, and be a huge step in establishing the potential of fusion energy to contribute to the world's energy security.

  5. Large-Area Atomic Oxygen Facility Used to Clean Fire-Damaged Artwork

    NASA Technical Reports Server (NTRS)

    Rutledge, Sharon K.; Banks, Bruce A.; Steuber, Thomas J.; Sechkar, Edward A.

    2000-01-01

    In addition to completely destroying artwork, fires in museums and public buildings can soil a displayed artwork with so much accumulated soot that it can no longer be used for study or be enjoyed by the public. In situations where the surface has not undergone extensive charring or melting, restoration can be attempted. However, soot deposits can be very difficult to remove from some types of painted surfaces, particularly when the paint is fragile or flaking or when the top surface of the paint binder has been damaged. Restoration typically involves the use of organic solvents to clean the surface, but these solvents may cause the paint layers to swell or leach out. Also, immersion of the surface or swabbing during solvent cleaning may move or remove pigment through mechanical contact, especially if the fire damage extends into the paint binder. A noncontact technique of removing organic deposits from surfaces was developed out of NASA research on the effects of oxygen atoms on various materials. Atomic oxygen is present in the atmosphere surrounding the Earth at the altitudes where satellites typically orbit. It can react chemically with surface coatings or deposits that contain carbon. In the reaction, the carbon is converted to carbon monoxide and some carbon dioxide. Water vapor is also a byproduct of the reaction if the surface contains carbon-hydrogen bonds. To study this reaction, NASA developed Earth-based facilities to produce atomic oxygen for material exposure and testing. A vacuum facility designed and built by the Electro-Physics Branch of the NASA Glenn Research Center at Lewis Field to provide atomic oxygen over a large area for studying reactions in low Earth orbit has been used to successfully clean several full-size paintings. (This facility can accommodate paintings up to 1.5 by 2.1 m. The atomic oxygen plasma is produced between two large parallel aluminum plates using a radiofrequency power source operating at roughly 400 W. Atomic oxygen is generated uniformly over this area at an operating pressure of 1 to 5 mtorr.

  6. Regulatory cross-cutting topics for fuel cycle facilities.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Denman, Matthew R.; Brown, Jason; Goldmann, Andrew Scott

    This report overviews crosscutting regulatory topics for nuclear fuel cycle facilities for use in the Fuel Cycle Research & Development Nuclear Fuel Cycle Evaluation and Screening study. In particular, the regulatory infrastructure and analysis capability is assessed for the following topical areas: Fire Regulations (i.e., how applicable are current Nuclear Regulatory Commission (NRC) and/or International Atomic Energy Agency (IAEA) fire regulations to advance fuel cycle facilities) Consequence Assessment (i.e., how applicable are current radionuclide transportation tools to support risk-informed regulations and Level 2 and/or 3 PRA) While not addressed in detail, the following regulatory topic is also discussed: Integrated Security,more » Safeguard and Safety Requirement (i.e., how applicable are current Nuclear Regulatory Commission (NRC) regulations to future fuel cycle facilities which will likely be required to balance the sometimes conflicting Material Accountability, Security, and Safety requirements.)« less

  7. Fire tests for airplane interior materials

    NASA Technical Reports Server (NTRS)

    Tustin, E. A.

    1980-01-01

    Large scale, simulated fire tests of aircraft interior materials were carried out in salvaged airliner fuselage. Two "design" fire sources were selected: Jet A fuel ignited in fuselage midsection and trash bag fire. Comparison with six established laboratory fire tests show that some laboratory tests can rank materials according to heat and smoke production, but existing tests do not characterize toxic gas emissions accurately. Report includes test parameters and test details.

  8. 24 CFR 3280.209 - Fire testing.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 5 2014-04-01 2014-04-01 false Fire testing. 3280.209 Section 3280... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Fire Safety § 3280.209 Fire testing. Link to an amendment published at 78 FR 73982, Dec. 9, 2013. All fire testing conducted in accordance with...

  9. Full-scale aircraft cabin flammability tests of improved fire-resistant materials

    NASA Technical Reports Server (NTRS)

    Stuckey, R. N.; Surpkis, D. E.; Price, L. J.

    1974-01-01

    Full-scale aircraft cabin flammability tests to evaluate the effectiveness of new fire-resistant materials by comparing their burning characteristics with those of older aircraft materials are described. Three tests were conducted and are detailed. Test 1, using pre-1968 materials, was run to correlate the procedures and to compare the results with previous tests by other organizations. Test 2 included newer, improved fire-resistant materials. Test 3 was essentially a duplicate of test 2, but a smokeless fuel was used. Test objectives, methods, materials, and results are presented and discussed. Results indicate that the pre-1968 materials ignited easily, allowed the fire to spread, produced large amounts of smoke and toxic combustion products, and resulted in a flash fire and major fire damage. The newer fire-resistant materials did not allow the fire to spread. Furthermore, they produced less, lower concentrations of toxic combustion products, and lower temperatures. The newer materials did not produce a flash fire.

  10. Methods for nuclear air-cleaning-system accident-consequence assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrae, R.W.; Bolstad, J.W.; Gregory, W.S.

    1982-01-01

    This paper describes a multilaboratory research program that is directed toward addressing many questions that analysts face when performing air cleaning accident consequence assessments. The program involves developing analytical tools and supportive experimental data that will be useful in making more realistic assessments of accident source terms within and up to the atmospheric boundaries of nuclear fuel cycle facilities. The types of accidents considered in this study includes fires, explosions, spills, tornadoes, criticalities, and equipment failures. The main focus of the program is developing an accident analysis handbook (AAH). We will describe the contents of the AAH, which include descriptionsmore » of selected nuclear fuel cycle facilities, process unit operations, source-term development, and accident consequence analyses. Three computer codes designed to predict gas and material propagation through facility air cleaning systems are described. These computer codes address accidents involving fires (FIRAC), explosions (EXPAC), and tornadoes (TORAC). The handbook relies on many illustrative examples to show the analyst how to approach accident consequence assessments. We will use the FIRAC code and a hypothetical fire scenario to illustrate the accident analysis capability.« less

  11. Modeling and Analysis of Realistic Fire Scenarios in Spacecraft

    NASA Technical Reports Server (NTRS)

    Brooker, J. E.; Dietrich, D. L.; Gokoglu, S. A.; Urban, D. L.; Ruff, G. A.

    2015-01-01

    An accidental fire inside a spacecraft is an unlikely, but very real emergency situation that can easily have dire consequences. While much has been learned over the past 25+ years of dedicated research on flame behavior in microgravity, a quantitative understanding of the initiation, spread, detection and extinguishment of a realistic fire aboard a spacecraft is lacking. Virtually all combustion experiments in microgravity have been small-scale, by necessity (hardware limitations in ground-based facilities and safety concerns in space-based facilities). Large-scale, realistic fire experiments are unlikely for the foreseeable future (unlike in terrestrial situations). Therefore, NASA will have to rely on scale modeling, extrapolation of small-scale experiments and detailed numerical modeling to provide the data necessary for vehicle and safety system design. This paper presents the results of parallel efforts to better model the initiation, spread, detection and extinguishment of fires aboard spacecraft. The first is a detailed numerical model using the freely available Fire Dynamics Simulator (FDS). FDS is a CFD code that numerically solves a large eddy simulation form of the Navier-Stokes equations. FDS provides a detailed treatment of the smoke and energy transport from a fire. The simulations provide a wealth of information, but are computationally intensive and not suitable for parametric studies where the detailed treatment of the mass and energy transport are unnecessary. The second path extends a model previously documented at ICES meetings that attempted to predict maximum survivable fires aboard space-craft. This one-dimensional model implies the heat and mass transfer as well as toxic species production from a fire. These simplifications result in a code that is faster and more suitable for parametric studies (having already been used to help in the hatch design of the Multi-Purpose Crew Vehicle, MPCV).

  12. Fire Control Agent Effectiveness for Hazardous Chemical Fires: Carbon Disulfide.

    DTIC Science & Technology

    1981-01-01

    Fires..................................... 46 12. AFFF Fire Control Data for Carbon Disulfide Fires............................. 47 13. Extinguishment...Disulfide and Hexane Fires ....... 67 22. Comparison of AFFF Fire Control Times for Carbon Disulfide and Hexane Fires ................... 68 23. Comparison of...Data .............. 27 2. Summary of Fluoroprotein Foam Fire Test Data ....... 28 3. Summary of AFFF Fire Test Data ..................... 29 4. Summary

  13. Contamination Impact of Station Brush Fire on Cleanroom Facilities

    NASA Technical Reports Server (NTRS)

    Carey, Phil; Blakkolb, Brian

    2010-01-01

    Brush and forest fires, both naturally occurring and anthropogenic in origin, in proximity to space flight hardware processing facilities raise concerns about the threat of contamination resulting from airborne particulate and molecular components of smoke. Perceptions of the severity of the threat are possibly heightened by the high sensitivity of the human sense of smell to some components present in the smoke of burning vegetation.On August 26th, 2009, a brushfire broke out north of Pasadena, California, two miles from the Jet Propulsion Laboratory. The Station Fire destroyed over 160,000 acres, coming within a few hundred yards of JPL. Smoke concentrations on Lab were very heavy over several days. All Lab operations were halted, and measures were taken to protect personnel, critical hardware, and facilities. Evaluation of real-time cleanroom monitoring data, visualinspection of facilities, filter systems, and analysis of surface cleanliness samples revealed facility environments andhardware were minimally effected.Outside air quality easily exceeded Class Ten Million. Prefilters captured most large ash and soot; multi-stage filtration greatly minimized the impact on the HEPA/ULPA filters. Air quality in HEPA filtered spacecraft assembly cleanrooms remained within Class 10,000 specification throughout. Surface cleanliness was inimally affected, as large particles were effectively removed from the airstream, and sub-micron particles have extremely long settling rates. Approximate particulate fallout within facilities was 0.00011% area coverage/day compared to 0.00038% area coverage/day during normal operations. Deposition of condensable airborne components, as measured in real time, peaked at approximately1.0 ng/cm2/day compared to 0.05 ng/cm2/day nominal.

  14. Contamination impact of station brush fire on cleanroom facilities

    NASA Astrophysics Data System (ADS)

    Carey, Philip A.; Blakkolb, Brian K.

    2010-08-01

    Brush and forest fires, both naturally occurring and anthropogenic in origin, in proximity to space flight hardware processing facilities raise concerns about the threat of contamination resulting from airborne particulate and molecular components of smoke. Perceptions of the severity of the threat are possibly heightened by the high sensitivity of the human sense of smell to some components present in the smoke of burning vegetation. On August 26th, 2009, a brushfire broke out north of Pasadena, California, two miles from the Jet Propulsion Laboratory. The Station Fire destroyed over 160,000 acres, coming within a few hundred yards of JPL. Smoke concentrations on Lab were very heavy over several days. All Lab operations were halted, and measures were taken to protect personnel, critical hardware, and facilities. Evaluation of real-time cleanroom monitoring data, visual inspection of facilities, filter systems, and analysis of surface cleanliness samples revealed facility environments and hardware were minimally effected. Outside air quality easily exceeded Class Ten Million. Prefilters captured most large ash and soot; multi-stage filtration greatly minimized the impact on the HEPA/ULPA filters. Air quality in HEPA filtered spacecraft assembly cleanrooms remained within Class 10,000 specification throughout. Surface cleanliness was minimally affected, as large particles were effectively removed from the airstream, and sub-micron particles have extremely long settling rates. Approximate particulate fallout within facilities was 0.00011% area coverage/day compared to 0.00038% area coverage/day during normal operations. Deposition of condensable airborne components, as measured in real time, peaked at approximately 1.0 ng/cm2/day compared to 0.05 ng/cm2/day nominal.

  15. Temporal Geophysical Investigations of the FT-2-Plume at the Wurtsmith Air Force Base, Oscoda, Michigan

    EPA Science Inventory

    The decommissioned Wurtsmith Air Force Base former Fire Training Cell (FT-02) facility has been the focus of several geophysical investigations. After several decades of fire training exercises, significant amounts of hydrocarbons and some solvents seeped into the subsurface cont...

  16. TEMPORAL GEOPHYSICAL INVESTIGATIONS OF THE FT-2-PLUME AT THE WURTSMITH AIR FORCE BASE, OSCODA, MICHIGAN

    EPA Science Inventory

    The decommissioned Wurtsmith Air Force Base former Fire Training Cell (FT-02) facility has been the focus of several geophysical investigations. After several decades of fire training exercises, significant amounts of hydrocarbons and some solvents seeped into the Subsurface cont...

  17. Occupancy Fire Record. Libraries.

    ERIC Educational Resources Information Center

    National Fire Protection Association, Boston, MA.

    Considerations essential to adequate protection for library facilities have been assembled in the form of recommendations and related to specific examples. Five steps are given which outline the procedures to follow in order to achieve fire safety. With regard to planning, six considerations are dealt with in detail--(1) the saving of lives, (2)…

  18. Coal-Fired Boilers at Navy Bases, Navy Energy Guidance Study, Phase II and III.

    DTIC Science & Technology

    1979-05-01

    several sizes were performed. Central plants containing four equal-sized boilers and central flue gas desulfurization facilities were shown to be less...Conceptual design and parametric cost studies of steam and power generation systems using coal-fired stoker boilers and stack gas scrubbers in

  19. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  20. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  1. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  2. 40 CFR 265.56 - Emergency procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Contingency Plan and Emergency Procedures § 265.56 Emergency procedures. (a) Whenever there is an... with designated response roles if their help is needed. (b) Whenever there is a release, fire, or... possible hazards to human health or the environment that may result from the release, fire, or explosion...

  3. 24 CFR 232.510 - Commitment and commitment fee.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Fees and Charges § 232.510 Commitment and commitment fee. (a) Issuance of... setting forth the terms and conditions upon which the fire safety loan will be insured. (b) Type of...

  4. Phoenix Spacecraft Heat Shield Deployment Test

    NASA Image and Video Library

    2007-05-16

    In the Payload Hazardous Servicing Facility, a worker monitors the Phoenix spacecraft during a heat shield deployment test, with a firing of ordnance associated with the separation device. Phoenix will land in icy soils near the north polar permanent ice cap of Mars and explore the history of the water in these soils and any associated rocks, while monitoring polar climate. Landing is planned in May 2008 on arctic ground where a mission currently in orbit, Mars Odyssey, has detected high concentrations of ice just beneath the top layer of soil. Launch of Phoenix aboard a Delta II rocket is targeted for Aug. 3 from Cape Canaveral Air Force Station in Florida.

  5. Phoenix Spacecraft Heat Shield Deployment Test

    NASA Image and Video Library

    2007-05-16

    In the Payload Hazardous Servicing Facility, workers monitor the Phoenix spacecraft during a heat shield deployment test, with a firing of ordnance associated with the separation device. Phoenix will land in icy soils near the north polar permanent ice cap of Mars and explore the history of the water in these soils and any associated rocks, while monitoring polar climate. Landing is planned in May 2008 on arctic ground where a mission currently in orbit, Mars Odyssey, has detected high concentrations of ice just beneath the top layer of soil. Launch of Phoenix aboard a Delta II rocket is targeted for Aug. 3 from Cape Canaveral Air Force Station in Florida.

  6. Flash fire propensity of materials

    NASA Technical Reports Server (NTRS)

    Hilado, C. J.; Cumming, H. J.

    1977-01-01

    Flash fire test results on 86 materials, evaluated using the USF flash fire screening test, are presented. The materials which appear least prone to flash fires are PVC, polyphenylene oxide and sulfide, and polyether and polyaryl sulfone; these did not produce flash fires under these particular test conditions. The principal value of these screening tests at the present time is in identifying materials which appear prone to flash fires, and in identifying which formulations of a generic material are more or less prone to flash fires.

  7. Spacecraft Fire Safety

    NASA Technical Reports Server (NTRS)

    Margle, Janice M. (Editor)

    1987-01-01

    Fire detection, fire standards and testing, fire extinguishment, inerting and atmospheres, fire-related medical science, aircraft fire safety, Space Station safety concerns, microgravity combustion, spacecraft material flammability testing, and metal combustion are among the topics considered.

  8. The development and evaluation of water-mist fire extinguishing systems

    NASA Astrophysics Data System (ADS)

    Beason, D. G.; Staggs, K. J.

    1994-08-01

    Fire protection for underfloor space is primarily provided by Halon 1301 which has proven to be very effective. However, due to the link between halons and the possible depletion of the stratospheric ozone layer, plans have been implemented to eventually phase out Halon 1301 and 1211. In September 1987 the Montreal Protocol concerning chlorofluorocarbons (CFC) and halons was signed by the United States, the European Economic Community, and 23 other nations. The Montreal Protocol calls for freezing halon production at 1986 levels. Because the majority of underfloor fire protection at Lawrence Livermore National Laboratory (LLNL), as well as other Department of Energy (DOE) sites, is either Halon 1301 or sprinklers, some other means of suppression will have to be developed and verified. The potential loss to facilities housing computer or control rooms damaged by underfloor fires can be extreme. These losses would not only include hardware and software replacement costs, but also lost computing and control capability. Here at LLNL technical research in a facility could be severely affected. Recent studies conducted by the Fire Research Discipline of the Special Projects Division have shown that severe fires fueled by cable insulation can develop within as little as a 6-in-high underfloor space (even with mechanical ventilation shut off). Studies also show that conventional sprinklers may not be effective in preventing this destruction. Therefore, we are investigating the water-mist fire extinguishing system as an alternative to Halon 1301 and sprinklers.

  9. Developing a byproduct materials information system for the Kentucky Transportation Cabinet.

    DOT National Transportation Integrated Search

    2007-09-01

    Kentucky has numerous coal-fired, electric generating facilities and, as a result, there are abundant byproduct materials being produced from these facilities that have environmental, engineering, and economic potential as materials for use in common...

  10. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  11. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  12. 48 CFR 252.246-7004 - Safety of Facilities, Infrastructure, and Equipment for Military Operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., Infrastructure, and Equipment for Military Operations. As prescribed in 246.270-4, use the following clause... contract comply with Unified Facilities Criteria (UFC) 1-200-01 for— (1) Fire protection; (2) Structural...

  13. What can be done to reduce false alarms?

    PubMed

    Baillie, Jonathan

    2013-05-01

    Although (the Department for Communities and Local Government's 'Fire statistics' reveal) the number of such incidents has fallen every year since 2006/07, UK fire and rescue services still attended over 312,400 'false fire alarms,' i.e. instances where, on arriving at a site, they found no fire, in 2011/12. Such incidents have been a significant concern for healthcare facilities teams, and for the fire and rescue services serving them, for many years, and, although the past decade has seen determined efforts to substantially reduce the number bearing fruit, many believe far too many still occur. HEJ editor, Jonathan Baillie, reports on a recent London roundtable discussion staged by two leading fire detection and alarm equipment specialists, Apollo Fire Detectors, and Static Systems Group, with IHEEM, which brought together experts to discuss what more can be done to minimise false fire alarms.

  14. An operational system of fire danger rating over Mediterranean Europe

    NASA Astrophysics Data System (ADS)

    Pinto, Miguel M.; DaCamara, Carlos C.; Trigo, Isabel F.; Trigo, Ricardo M.

    2017-04-01

    A methodology is presented to assess fire danger based on the probability of exceedance of prescribed thresholds of daily released energy. The procedure is developed and tested over Mediterranean Europe, defined by latitude circles of 35 and 45°N and meridians of 10°W and 27.5°E, for the period 2010-2016. The procedure involves estimating the so-called static and daily probabilities of exceedance. For a given point, the static probability is estimated by the ratio of the number of daily fire occurrences releasing energy above a given threshold to the total number of occurrences inside a cell centred at the point. The daily probability of exceedance which takes into account meteorological factors by means of the Canadian Fire Weather Index (FWI) is in turn estimated based on a Generalized Pareto distribution with static probability and FWI as covariates of the scale parameter. The rationale of the procedure is that small fires, assessed by the static probability, have a weak dependence on weather, whereas the larger fires strongly depend on concurrent meteorological conditions. It is shown that observed frequencies of exceedance over the study area for the period 2010-2016 match with the estimated values of probability based on the developed models for static and daily probabilities of exceedance. Some (small) variability is however found between different years suggesting that refinements can be made in future works by using a larger sample to further increase the robustness of the method. The developed methodology presents the advantage of evaluating fire danger with the same criteria for all the study area, making it a good parameter to harmonize fire danger forecasts and forest management studies. Research was performed within the framework of EUMETSAT Satellite Application Facility for Land Surface Analysis (LSA SAF). Part of methods developed and results obtained are on the basis of the platform supported by The Navigator Company that is currently providing information about fire meteorological danger for Portugal for a wide range of users.

  15. KSC-2013-1073

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  16. KSC-2013-1074

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  17. KSC-2013-1077

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  18. KSC-2013-1078

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  19. KSC-2013-1075

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  20. KSC-2013-1076

    NASA Image and Video Library

    2013-01-11

    CAPE CANAVERAL, Fla. – At NASA’s Kennedy Space Center in Florida, a new 12-inch water main is being installed as part of a water/wastewater revitalizing plan. The main will provide water to the area around the shuttle landing facility's Landing Aids Control Building and fire station. NASA’s space shuttle runway is a unique national asset designed to enable the recovery of the agency’s fleet of space shuttle orbiters. The shuttle landing facility is a single, 15,000-foot long concrete runway oriented to the southeast and northwest. Air traffic control is provided from a control tower built to FAA standards. Fire and emergency response services are also available from an onsite facility. For more information, visit http://kscpartnerships.ksc.nasa.gov/slf.htm Photo credit: NASA/Tim Jacobs

  1. Safety engineering in handling fuels and lubricants in civil aviation

    NASA Astrophysics Data System (ADS)

    Protoereiskii, Aleksandr Stepanovich

    The book is concerned with methods of improving working conditions, work hygiene, safety engineering, and fire and explosion prevention during the storage and handling of petroleum products at fuel and lubricant storage facilities. The discussion covers methods of protection against static and atmospheric discharges, lightning protection, safety engineering in fuel and lubricant laboratories, and methods of fire prevention and fire extinction. Attention is also given to methods for administering first aid in case of accidents and poisoning.

  2. A common sense approach to sprinklers.

    PubMed

    Passingham, Andy

    2010-03-01

    As debate continues over the importance of incorporating automatic sprinkler systems into healthcare facilities, Andy Passingham, associate director at Arup Fire, considers how Arup, the multi-disciplinary engineers for two high profile new Welsh hospitals under construction in Ebbw Vale and Caerphilly, addressed fire safety on both projects. He highlights how the installation of sprinklers should not only improve fire safety, but has also contributed to a number of wider design elements which should enhance the patient, staff, and visitor experience.

  3. Fire Rescue Exercise

    NASA Image and Video Library

    2014-03-06

    CAPE CANAVERAL, Fla. - Special Rescue Operations firefighters with NASA Fire Rescue Services in the Protective Services Office at NASA’s Kennedy Space Center in Florida participate in a training exercise at the Shuttle Landing Facility. Firefighters use a fire truck to put out a fire burning close to a mock-up of a small plane and a truck. Kennedy’s firefighters recently achieved Pro Board Certification in aerial fire truck operations and completed vehicle extrication training using the Jaws of Life. The Protective Services Office is one step closer to achieving certification in vehicle machinery extrication and other rescue skills. Kennedy’s firefighters are with G4S Government Solutions Inc., on the Kennedy Protective Services Contract. Photo credit: NASA/Kim Shiflett

  4. Further studies of fuels from alternate sources - fire extinguishment experiments with JP-5 jet turbine fuel derived from shale. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hazlett, R.N.; Affens, W.A.; McLaren, G.W.

    1978-05-01

    Fire extinguishment experiments with JP-5 jet fuels derived from shale crude oil and also from petroleum (for comparison) were conducted at NRL's Chesapeake Bay facility. The experiments were conducted in a 40-foot diameter circular pool using Aqueous Film Forming Foam (AFFF) as the fire extinguishing agent. The results with both types of fuel were similar, and it was concluded that the techniques and agents for AFFF application, which have been developed for petroleum fuel fires, can also be used for shale derived jet fuel.

  5. 40 CFR 60.42c - Standard for sulfur dioxide (SO2).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....2 lb/MMBtu) heat input. If coal is combusted with other fuels, the affected facility shall neither... excess of 520 ng/J (1.2 lb/MMBtu) heat input. If coal is fired with coal refuse, the affected facility.../MMBtu) heat input. If coal is combusted with other fuels, the affected facility is subject to the 50...

  6. NO PLIF Visualizations of the Orion Capsule in LENS-I

    NASA Technical Reports Server (NTRS)

    Combs, C.; Clemens, N.; Danehy, P. M.; Bathel, B.; Parker, R.; Wadhams, T.; Holden, M.; Kirk, B.

    2013-01-01

    Planar laser-induced fluorescence (PLIF) of nitric oxide (NO) was used to visualize the interaction of reaction-control-system (RCS) jet flows in the wake of a hypersonic capsule reentry vehicle. The tests were performed at the Calspan University at Buffalo Research Center's (CUBRC) LENS-I reflected shock tunnel facility. This was the first application of PLIF to study RCS jets in a large-scale pulsed hypersonic facility. The LENS-I facility allowed RCS jet flows to be studied while varying the flow enthalpy, Reynolds number, angle of attack and jet configuration. The interaction of pitch and roll jets with the flowfield was investigated. Additionally, thin film sensors were used to monitor heat transfer on the surface of the model to detect any localized heating resulting from the firing of the RCS jets. Tests were conducted with the model held at angles of attack of 18deg and 22deg. The nominal Mach number in all tests was 8, while Reynolds number based on model diameter ranged from 2.2x10(exp 6) - 1.5x10(exp 7). Images were processed using the Virtual Diagnostics Interface (ViDI) system developed at NASA Langley Research Center to provide a three-dimensional display of the experimental data.

  7. 42 CFR 124.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...

  8. Space Shuttle Projects

    NASA Image and Video Library

    1987-07-01

    A forward segment is being lowered into the Transient Pressure Test Article (TPTA) test stand at the Marshall Space Flight Center (MSFC) east test area. The TPTA test stand, 14-feet wide, 27-feet long, and 33-feet high, was built in 1987 to provide data to verify the sealing capability of the redesign solid rocket motor (SRM) field and nozzle joints. The test facility applies pressure, temperature, and external loads to a short stack of solid rocket motor hardware. The simulated SRM ignition pressure and temperature transients are achieved by firing a small amount of specially configured solid propellant. The pressure transient is synchronized with external programmable dynamic loads that simulate lift off loads at the external tank attach points. Approximately one million pounds of dead weight on top of the test article simulates the weight of the other Shuttle elements.

  9. Space Shuttle Projects

    NASA Image and Video Library

    1987-07-01

    A forward segment is being lowered into the Transient Pressure Test Article (TPTA) test stand at thw Marshall Space Flight Center (MSFC) east test area. The TPTA test stand, 14-feet wide, 27-feet long, and 33-feet high, was built in 1987 to provide data to verify the sealing capability of the redesign solid rocket motor (SRM) field and nozzle joints. The test facility applies pressure, temperature, and external loads to a short stack of solid rocket motor hardware. The simulated SRM ignition pressure and temperature transients are achieved by firing a small amount of specially configured solid propellant. The pressure transient is synchronized with external programmable dynamic loads that simulate lift off loads at the external tank attach points. Approximately one million pounds of dead weight on top of the test article simulates the weight of the other Shuttle elements.

  10. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Fossil-Fuel-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60... provisions of this subpart apply are: (1) Each fossil-fuel-fired steam generating unit of more than 73 megawatts (MW) heat input rate (250 million British thermal units per hour (MMBtu/hr)). (2) Each fossil-fuel...

  11. 40 CFR 60.40 - Applicability and designation of affected facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Fossil-Fuel-Fired Steam Generators for Which Construction Is Commenced After August 17, 1971 § 60... provisions of this subpart apply are: (1) Each fossil-fuel-fired steam generating unit of more than 73 megawatts (MW) heat input rate (250 million British thermal units per hour (MMBtu/hr)). (2) Each fossil-fuel...

  12. 36 CFR 1234.34 - When may NARA conduct an inspection of a records storage facility?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....) Required. Entrances/Exits: X-ray & magnetometer at public entrances Recommended. Require x-ray screening of... design requirements, (e.g. fire detection, fire suppression systems, etc.) Entrances/Exits X-Ray and... would focus on tenant agencies, public interface, and feasibility. Required for Level V. Require X-Ray...

  13. 36 CFR 1234.34 - When may NARA conduct an inspection of a records storage facility?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....) Required. Entrances/Exits: X-ray & magnetometer at public entrances Recommended. Require x-ray screening of... design requirements, (e.g. fire detection, fire suppression systems, etc.) Entrances/Exits X-Ray and... would focus on tenant agencies, public interface, and feasibility. Required for Level V. Require X-Ray...

  14. 76 FR 19768 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NESHAP for Beryllium Rocket Motor... . Title: NESHAP for Beryllium Rocket Motor Fuel Firing (Renewal). ICR Numbers: EPA ICR Number 1125.06, OMB...: Owners or operators of beryllium rocket motor fuel firing facilities. Estimated Number of Respondents: 1...

  15. 20 CFR 654.417 - Fire, safety, and first aid.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Fire, safety, and first aid. 654.417 Section..., safety, and first aid. (a) All buildings in which people sleep or eat shall be constructed and maintained...-type water extinguisher. (g) First aid facilities shall be provided and readily accessible for use at...

  16. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  17. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  18. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  19. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

  20. 27 CFR 22.113 - Receipt of tax-free alcohol.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., it shall be placed in the storage facilities prescribed by § 22.91 and kept there under lock until withdrawn for use. Unless required by city or State fire code regulations or authorized by the appropriate... alcohol is transferred to “safety” containers in accordance with fire code regulations, the containers to...

Top