Sample records for five-day docking operations

  1. Swanson uses communication equipment in the A/L during Joint Operations

    NASA Image and Video Library

    2007-06-12

    S117-E-07099 (12 June 2007) --- Astronaut Steven Swanson, STS-117 mission specialist, uses a communication system in the Quest Airlock of the International Space Station during flight day five activities while Space Shuttle Atlantis was docked with the station.

  2. Archambault uses communication equipment in the U.S. Laboratory during Joint Operations

    NASA Image and Video Library

    2007-06-12

    S117-E-07097 (12 June 2007) --- Astronaut Lee Archambault, STS-117 pilot, uses a communication system near the controls of the Space Station Remote Manipulator System (SSRMS) or Canadarm2 in the Destiny laboratory of the International Space Station during flight day five activities while Space Shuttle Atlantis was docked with the station.

  3. STS-71 astronauts training in Russia

    NASA Image and Video Library

    1994-09-20

    S94-45647 (20 Sept 1994) --- Astronaut's Norman E. Thagard and Bonnie J. Dunbar by the Mir Space Station simulator at the Gagarin Cosmonaut Training Center (Star City), near Moscow, Russia. In March 1995, astronaut Thagard is scheduled to be launched in a Russian Soyuz spacecraft with two cosmonauts to begin a three-month tour of duty on the Russian Mir Space Station. Thagard, along with his back-up, astronaut Dunbar, has been training in Russia since February 1994. During his stay on Mir, he will conduct a variety of life sciences experiments that will provide U.S. investigators with the first long-duration exposure data since Skylab in the late 1970's. Thagard's mission will end in late May or early June when the Space Shuttle Atlantis, carrying the newly installed docking mechanism, docks with Mir Space Station for the first United States - Russian docking operation since Apollo-Soyuz in 1975. The Orbiter will remain attached to Mir for five days of joint scientific operations before returning home with Thagard and his Russian crew mates and leaving behind two cosmonauts on Mir.

  4. STS-71 astronauts training in Russia

    NASA Image and Video Library

    1994-09-20

    S94-45643 (20 Sept 1994) --- Astronaut Norman E. Thagard in a cosmonaut space suit in the Training Simulator Facility at the Gagarin Cosmonaut Training Center (Star City), near Moscow, Russia. In March 1995, astronaut Thagard is scheduled to be launched in a Russian Soyuz spacecraft with two cosmonauts to begin a three-month tour of duty on the Russian Mir Space Station. Thagard, along with his back-up, astronaut Bonnie J. Dunbar, has been training in Russia since February 1994. During his stay on Mir, he will conduct a variety of life sciences experiments that will provide U.S. investigators with the first long-duration exposure data since Skylab in the late 1970's. Thagard's mission will end in July when the Space Shuttle Atlantis, carrying the newly installed docking mechanism, docks with Mir Space Station for the first United States - Russian docking operation since Apollo-Soyuz in 1975. The Orbiter will remain attached to Mir for five days of joint scientific operations before returning home with Thagard and his Russian crew mates and leaving behind two cosmonauts on Mir.

  5. Operator learning effects in teleoperated rendezvous & docking

    NASA Astrophysics Data System (ADS)

    Wilde, M.; Harder, J.; Purschke, R.

    Teleoperation of spacecraft proximity operations and docking requires delicate timing and coordination of spacecraft maneuvers. Experience has shown that human operators show large performance fluctuations in these areas, which are a major factor to be addressed in operator training. In order to allow the quantification of the impact of these human fluctuations on control system performance and the human perception of this performance, a learning curve study was conducted with teleoperated final approach and docking scenarios. Over a period of ten experiment days, three test participants were tasked with repeatedly completing a set of three training scenarios. The scenarios were designed to contain different combinations of the major elements of any final approach and docking situation, and to feature an increasing difficulty level. The individual difficulty levels for the three operators furthermore differed in the level of operator support functions available in their human-machine interfaces. Operator performance in the test scenarios were evaluated in the fields approach success and precision, docking safety, and approach efficiency by a combination of recorded maneuver data and questionnaires. The results show that operator experience and the associated learning curves increase operator performance substantially, regardless of the support system used. The paper also shows that the fluctuations in operator performance and self-perception are substantial between as well as within experiment days, and must be reckoned with in teleoperation system design and mission planning.

  6. KSC-97pc120

    NASA Image and Video Library

    1997-01-08

    The STS-81 flight crew conducts a press briefing on the runway of KSC's Shuttle Landing Facility after they arrive at the space center for the final countdown preparations for the fifth Shuttle-Mir docking mission. They are (from left): Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists Peter J. K. "Jeff" Wisoff; John M. Grunsfeld, Marsha S. Ivins, and J.M. "Jerry" Linenger. The 10-day mission will feature the transfer of Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996 after arrival there during the STS79 mission. During STS-81, Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module which will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station during five days of docking operations. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  7. KSC-97pc123

    NASA Image and Video Library

    1997-01-08

    The STS-81 flight crew is welcomed to KSC by NASA Administrator Daniel Goldin (far right) and Johnson Space Center Director George Abbey (second from right) as they arrive at the space center for the final countdown preparations for the fifth Shuttle-Mir docking mission. They are (from left): Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists Peter J. K. "Jeff" Wisoff; John M. Grunsfeld, Marsha S. Ivins, and J.M. "Jerry" Linenger. The 10-day mission will feature the transfer of Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996 after arrival there during the STS-79 mission. During STS-81, Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module which will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station during five days of docking operations. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  8. KSC-97pc145

    NASA Image and Video Library

    1997-01-12

    The Space Shuttle Atlantis transforms the early morning at KSC into near-daylight as its more than 7 million pounds of rocket thrust propels it from Launch Pad 39B at 4:27:23 a.m. EST Jan. 12 on its way to dock with the Mir space station for the fifth time.The 10-day mission will feature the transfer of Mission Specialist Jerry Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996. The other STS-81 crew members include Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists John M. Grunsfeld, Peter J. K. "Jeff" Wisoff and Marsha S. Ivins. During the five-day docking operations, the Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module that will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  9. KSC-97pc143

    NASA Image and Video Library

    1997-01-12

    KENNEDY SPACE CENTER, FLA. -- Like a rising sun lighting up the night, the Space Shuttle Atlantis soars from Launch Pad 39B at 4:27:23 a.m. EST Jan. 12 on its way to dock with the Mir space station for the fifth time. The 10-day mission will feature the transfer of Mission Specialist Jerry Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996. The other STS-81 crew members include Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists John M. Grunsfeld, Peter J. K. "Jeff" Wisoff and Marsha S. Ivins. During the five-day docking operations, the Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module that will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station.The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  10. KSC-97pc142

    NASA Image and Video Library

    1997-01-12

    Like a rising sun lighting up the night, the Space Shuttle Atlantis soars from Launch Pad 39B at 4:27:23 a.m. EST Jan. 12 on its way to dock with the Mir space station for the fifth time. The 10-day mission will feature the transfer of Mission Specialist Jerry Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996. The other STS-81 crew members include Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists John M. Grunsfeld, Peter J. K. "Jeff" Wisoff and Marsha S. Ivins. During the five-day docking operations, the Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module that will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station.The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  11. KSC-97pc119

    NASA Image and Video Library

    1997-01-08

    The STS-81 flight crew poses on the runway of KSC Shuttle Landing Facility after they arrive at the space center for the final countdown preparations for the fifth Shuttle-Mir docking mission. They are (from left): Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists Peter J. K. "Jeff" Wisoff; John M. Grunsfeld, Marsha S. Ivins, and J.M. "Jerry" Linenger. The 10-day mission will feature the transfer of Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996 after arrival there during the STS-79 mission. During STS-81, Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module which will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station during five days of docking operations. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  12. STS-74 liftoff (front view across water with bird)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The Space Shuttle Atlantis breaks free from its Earthly ties and soars toward the stars. The five astronauts assigned to Mission STS-74 are headed for an historic rendezvous in space: the second docking of the U.S. Space Shuttle with the Russian Space Station Mir. Atlantis lifted off from Launch Pad 39A at 7:30:43.071 a.m. EST, Nov. 12. The mission commander is Kenneth D. Cameron; James D. Halsell Jr. is the pilot, and the three mission specialists are Jerry L. Ross, William S. 'Bill' McArthur Jr., and Chris A. Hadfield, who represents the Canadian Space Agency. The profile of Mission STS-74 represents a direct precursor to the types of activities flight crews will carry out during assembly and operation of the international space station later this decade. During their eight-day spaceflight, the crew will deliver a Russian-built Docking Module to Mir. The Docking Module will be attached to the docking port on Mir's Kristall module to serve as a permanent extension to the station to simplify future linkups with the Shuttle. The Shuttle astronauts and the three cosmonauts on Mir also will transfer logistics materials to and from Mir.

  13. KSC-97pc144

    NASA Image and Video Library

    1997-01-12

    KENNEDY SPACE CENTER, FLA. -- The Space Shuttle Atlantis transforms the early morning at KSC into near-daylight as its more than 7 million pounds of rocket thrust propels it from Launch Pad 39B at 4:27:23 a.m. EST Jan. 12 on its way to dock with the Mir space station for the fifth time.The 10-day mission will feature the transfer of Mission Specialist Jerry Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996. The other STS-81 crew members include Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists John M. Grunsfeld, Peter J. K. "Jeff" Wisoff and Marsha S. Ivins. During the five-day docking operations, the Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module that will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission

  14. STS-81 CREW DURING SAFETY EQUIPMENT DEMONSTRATION AT LC 39B DURING TCDT

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The STS-81 crew gets a description of safety equipment and emergency egress routes on Launch Pad 39B during Terminal Countdown Demonstration Test (TCDT) exercises for that mission. They are (from left): Mission Specialists Marsha S. Ivins, J.M. 'Jerry' Linenger and Peter J. K. 'Jeff' Wisoff; Mission Commander Michael A. Baker; Mission Specialist John M. Grunsfeld; and Pilot Brent W. Jett, Jr. STS-81 is the fifth Shuttle-Mir docking mission and will feature the transfer of Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19 after arrival there during the STS-79 mission. During STS-81, Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station during five days of docking operations during the 10-day mission. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission.

  15. STS-81 Crew at SLF with NASA Administrator Dan Goldin

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The STS-81 flight crew is welcomed to KSC by NASA Administrator Daniel Goldin (far right) and Johnson Space Center Director George Abbey (second from right) as they arrive at the space center for the final countdown preparations for the fifth Shuttle-Mir docking mission. They are (from left): Mission Commander Michael A. Baker; Pilot Brent W. Jett, Jr.; and Mission Specialists Peter J. K. 'Jeff' Wisoff; John M. Grunsfeld, Marsha S. Ivins, and J.M. 'Jerry' Linenger. The 10-day mission will feature the transfer of Linenger to Mir to replace astronaut John Blaha, who has been on the orbital laboratory since Sept. 19, 1996 after arrival there during the STS-79 mission. During STS- 81, Shuttle and Mir crews will conduct risk mitigation, human life science, microgravity and materials processing experiments that will provide data for the design, development and operation of the International Space Station. The primary payload is the SPACEHAB-DM double module will provide space for more than 2,000 pounds of hardware, food and water that will be transferred into the Russian space station during five days of docking operations. The SPACEHAB will also be used to return experiment samples from the Mir to Earth for analysis and for microgravity experiments during the mission.

  16. Transoral robotic-assisted laryngeal cleft repair in the pediatric patient.

    PubMed

    Leonardis, Rachel L; Duvvuri, Umamaheswar; Mehta, Deepak

    2014-09-01

    To assess the feasibility of performing robotic-assisted laryngeal cleft repair in the pediatric population. Retrospective chart review at a tertiary academic children's hospital. All patients underwent transoral robotic-assisted laryngeal cleft repair from March 2011 to June 2013. Demographics, robotic docking time, operative time, and postoperative course and swallowing function were collected and analyzed. Five children, three male and two female, underwent successful transoral robotic-assisted laryngeal cleft repair for closure of a type I laryngeal cleft. Mean age at time of surgery was 21.6 months (standard deviation 6.1 months; range, 15-29 months). From case 1 to case 5, robotic docking time (18-10 minutes), robotic operative time (102-36 minutes), and total operating room time (173-105 minutes) decreased. There were no complications with time until extubation (range, 2-3 days), length of intensive care unit stay (range, 3-4 days), and total hospital stay (range, 3-5 days) within acceptable range following laryngeal cleft repair. Modified barium swallow (two patients) or fiberoptic endoscopic evaluation of swallowing (three patients) was performed postoperatively, with all patients showing complete resolution of penetration and aspiration. In addition, all patients experienced subjective resolution of dysphagia and/or choking with feeds postoperatively. Transoral robotic-assisted laryngeal cleft repair may offer specific advantages over a traditional endoscopic approach. In our experience, the procedure was well tolerated and associated with definitive surgical cure in all patients. The scope of robotic technology continually expands and should be considered a feasible tool at an institution-based level. © 2014 The American Laryngological, Rhinological and Otological Society, Inc.

  17. Precision in robotic rectal surgery using the da Vinci Xi system and integrated table motion, a technical note.

    PubMed

    Panteleimonitis, Sofoklis; Harper, Mick; Hall, Stuart; Figueiredo, Nuno; Qureshi, Tahseen; Parvaiz, Amjad

    2017-09-15

    Robotic rectal surgery is becoming increasingly more popular among colorectal surgeons. However, time spent on robotic platform docking, arm clashing and undocking of the platform during the procedure are factors that surgeons often find cumbersome and time consuming. The newest surgical platform, the da Vinci Xi, coupled with integrated table motion can help to overcome these problems. This technical note aims to describe a standardised operative technique of single docking robotic rectal surgery using the da Vinci Xi system and integrated table motion. A stepwise approach of the da Vinci docking process and surgical technique is described accompanied by an intra-operative video that demonstrates this technique. We also present data collected from a prospectively maintained database. 33 consecutive rectal cancer patients (24 male, 9 female) received robotic rectal surgery with the da Vinci Xi during the preparation of this technical note. 29 (88%) patients had anterior resections, and four (12%) had abdominoperineal excisions. There were no conversions, no anastomotic leaks and no mortality. Median operation time was 331 (249-372) min, blood loss 20 (20-45) mls and length of stay 6.5 (4-8) days. 30-day readmission rate and re-operation rates were 3% (n = 1). This standardised technique of single docking robotic rectal surgery with the da Vinci Xi is safe, feasible and reproducible. The technological advances of the new robotic system facilitate the totally robotic single docking approach.

  18. VIew of Mission Control on first day of ASTP docking in Earth orbit

    NASA Technical Reports Server (NTRS)

    1975-01-01

    An overall view of the Mission Operations Control Room in the Mission Control Center on the first day of the Apollo Soyuz Test Project (ASTP) docking in Earth orbit mission. The American ASTP flight controllers at JSC were monitoring the progress of the Soviet ASTP launch when this photograph was taken. The television monitor shows Cosmonaut Yuri V. Romanenko at his spacecraft communicator's console in the ASTP mission control center in the Soviet Union.

  19. View of Mission Control on first day of ASTP docking in Earth orbit

    NASA Technical Reports Server (NTRS)

    1975-01-01

    An overall view of the Mission Operations Control Room in the Mission Control Center, bldg 30, JSC, on the first day of the Apollo Soyuz Test Project (ASTP) docking in Earth orbit. This photograph was taken shortly before the American ASTP launch from the Kennedy Space Center. The television monitor in the center background shows the ASTP Apollo-Saturn 1B space vehicle on Pad B at KSC's Launch Complex 39.

  20. STS-115 Space Shuttle Atlantis docked on the ISS during Joint Operations

    NASA Image and Video Library

    2006-09-12

    S115-E-05722 (12 Sept. 2006) --- The Space Shuttle Atlantis will remain docked with the International Space Station like this for several more days as the STS-115 and Expedition 13 crewmembers join efforts to resume construction of the International Space Station. This image was taken during the first of three scheduled space walks.

  1. KSC-97pc138

    NASA Image and Video Library

    1997-01-12

    STS-81 Mission Commander Michael A. Baker is assisted into his launch/entry suit in the Operations and Checkout (O&C) Building. Baker is on his fourth space flight and will have responsibility for the 10-day mission, including the intricate docking and undocking maneuvers with the Russian Mir space station. He will also be in charge of two in-flight Risk Mitigation experiments and be the subject of a Human Life Sciences experiment. He and five crew members will shortly depart the O&C and head for Launch Pad 39B, where the Space Shuttle Atlantis will lift off during a 7-minute window that opens at 4:27 a.m. EST, January 12

  2. External airlock assembly/Mir docking system being loaded

    NASA Image and Video Library

    1994-11-15

    S95-00057 (15 Nov 1994) --- In Rockwell's Building 290 at Downey, California, the external airlock assembly/Mir docking system is rotated into position for crating up for shipment to the Kennedy Space Center (KSC) in Florida. Jointly developed by Rockwell and RSC Energia, the external airlock assembly and Mir docking system will be mounted in the cargo bay of the Space Shuttle Atlantis to enable the shuttle to link up to Russia's Mir space station. The docking system contains hooks and latches compatible with the system currently housed on the Mir's Krystall module, to which Atlantis will attach for the first time next spring. STS-71 will carry two Russian cosmonauts, who will replace a three-man crew aboard Mir including Norman E. Thagard, a NASA astronaut. The combined 10-person crew will conduct almost five days of joint life sciences investigations both aboard Mir and in the Space Shuttle Atlantis's Spacelab module.

  3. VIew of Mission Control on first day of ASTP docking in Earth orbit

    NASA Image and Video Library

    1975-07-15

    S75-28483 (15 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center on the first day of the Apollo-Soyuz Test Project docking mission in Earth orbit. The American ASTP flight controllers at NASA's Johnson Space Center were monitoring the progress of the Soviet ASTP launch when this photograph was taken. The television monitor shows cosmonaut Yuri V. Romanenko at his spacecraft communicator?s console in the ASTP mission control center in the Soviet Union. The American ASTP liftoff followed the Soviet ASTP launch by seven and one-half hours.

  4. Robotic single port cholecystectomy (R-LESS-C): experience in 36 patients.

    PubMed

    Uras, Cihan; Böler, Deniz Eren; Ergüner, Ilknur; Hamzaoğlu, Ismail

    2014-07-01

    Laparoendoscopic single-site surgery (LESS) has emerged as a result of a search for "pain-less" and "scar-less" surgery. Laparoendoscopic single-site cholecystectomy (LESS-C) is probably the most common application in general surgery, although it harbors certain limitations. It was proposed that the da Vinci Single-Site (Si) robotic system may overcome some of the difficulties experienced during LESS, providing three dimensional views and the ability to work in a right-handed fashion. Thirty-six robotic single port cholecystectomies (R-LESS-C) performed with the da Vinci Si robotic system are evaluated in this paper R-LESS-C performed in 36 patients were reviewed. The data related to the perioperative period (i.e., anesthesia time, operation time, docking time, and console time) was recorded prospectively, whereas the hospitalization period, postoperative visual analogue scale (VAS) pain scores were collected retrospectively. A total number of 36 patients, with a mean age of 40.1 years (21-64 years), underwent R-LESS-C. There were five men and 31 women. The mean anesthesia and operation times were 79.3 minutes (45-130 minutes) and 61.8 minutes (34-110 minutes), respectively. The mean docking time was 9.8 minutes (4-30 minutes) and the mean console time was 24.9 minutes (7-60 minutes). The mean hospital stay was 1.05 days (1-2 days) and the mean pain score (VAS) was 3.6 (2-8) in the first 24 hours. Incisional hernia was recorded in one patient. R-LESS-C can be performed reliably with acceptable operative times and safety. The da Vinci Si robotic system may ease LESS-C. Two issues should be considered for routine use: expensive resources are needed and the incidence of incisional hernia may increase. Copyright © 2013. Published by Elsevier B.V.

  5. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030552 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  6. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030578 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  7. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030563 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  8. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030460 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  9. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030445 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  10. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030584 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  11. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030444 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  12. Progress 37P on approach to the ISS

    NASA Image and Video Library

    2010-05-01

    ISS023-E-030528 (1 May 2010) --- An unpiloted ISS Progress resupply vehicle approaches the International Space Station, bringing 2.6 tons of food, fuel, oxygen, propellant and supplies for the Expedition 23 crew members aboard the station. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan. The docking was conducted by Russian cosmonaut Oleg Kotov, commander, in manual control through the TORU (telerobotically operated) rendezvous system due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system.

  13. STS-71 Shuttle Atlantis landing closeup

    NASA Technical Reports Server (NTRS)

    1995-01-01

    KENNEDY SPACE CENTER, FLA. -- The Space Shuttle orbiter Atlantis makes a smooth touchdown on Runway 15 of the Shuttle Landing Facility, bringing an end to the historic STS-71 mission which featured the first docking between the Space Shuttle and the Russian Mir space station. The chase plane, the Shuttle Training Aircraft flown by Robert D. Cabana, head of the Astronaut Office, is in the upper left of photo. Main gear touchdown of Atlantis was at 10:54:34 a.m. EDT, on July 7, 1995. This was the first of seven scheduled Shuttle/Mir docking missions. The 10-day mission also set the record for having the most people who have flown in an orbiter during a mission: the five U.S. astronauts and two cosmonauts who were launched on Atlantis on June 27, and three space flyers who have been aboard Mir since March 16 and were returned to Earth in Atlantis. The STS-71 crew included Mission Commander Robert L. 'Hoot' Gibson, Pilot Charles J. Precourt, Payload Commander Dr. Ellen S. Baker, and Mission Specialists Bonnie J. Dunbar and Gregory J. Harbaugh. Also part of the STS-71 crew were two cosmonauts who comprise the Mir 19 crew -- Mission Commander Anatoly Y. Solovyev and Flight Engineer Nikolai M. Budarin. They transfered to Mir during the four days of docking operations, and remain there. They replaced the Mir 18 crew of U.S. astronaut and cosmonaut researcher Dr. Norman E. Thagard, and cosmonauts Vladimir N. Dezhurov, who served as mission commander, and Gennadiy M. Strekalov, who served as flight engineer. The Mir crew joined the American STS-71 crew members for the return to Earth on Atlantis.

  14. Atlantis lifts off on mission STS-84

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  15. KSC-97PC803

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  16. KSC-97PC800

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  17. KSC-97PC802

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  18. KSC-97PC804

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  19. STS-84 Liftoff (across water)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  20. KSC-97PC801

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  1. STS-84 Shuttle Atlantis Liftoff

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  2. KSC-97PC805

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  3. KSC-97PC799

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  4. KSC-97PC798

    NASA Image and Video Library

    1997-05-15

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  5. STS-84 Night Launch (left view)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  6. STS-84 Night Launch (front view)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  7. STS-84 Night Launch (side view)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Atlantis turns night into day for a few moments as it lifts off on May 15 at 4:07:48 a.m. EDT from Launch Pad 39A on the STS-84 mission. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  8. Usage of pre-flight data in short rendezvous mission of Soyuz-TMA spacecrafts

    NASA Astrophysics Data System (ADS)

    Murtazin, Rafail; Petrov, Nikolay

    2014-01-01

    The paper describes the reduction of the vehicle autonomous flight duration before docking to the ISS. The Russian Soyuz-TMA spacecraft dock to the ISS two days after launch. Due to the limited volume inside Soyuz-TMA the reduction of time until docking to the ISS is very important, since the long stay of the cosmonauts in the limited volume adds to the strain of the space flight. In the previous papers of the authors it was shown that the existing capabilities of Soyuz-TMA, the ISS and the ground control loop make it possible to transfer to the five-orbit rendezvous profile. However, the analysis of the cosmonauts' schedule on the launch day shows that its duration is at the allowable limit and that is why it is necessary to find a way to further reduce the flight duration of Soyuz-TMA before docking to less than five orbits. In a traditional rendezvous profile, the calculation of rendezvous burns begins only after determination of the actual vehicle insertion orbit. The paper describes an approach in which the first two rendezvous burns are performed as soon as the spacecraft reaches the reference orbit and the values of the burns are calculated prior to the launch based on the pre-flight data for the nominal insertion. This approach decreases the duration of the rendezvous by one orbit. The demonstration flight of a Progress vehicle using the proposed profile was implemented on August 1, 2012 and completely confirmed the correctness of the imbedded principles. The paper considers the possible improvements of the proposed approach and recovery from the contingencies.

  9. STS-79 Flight Day 9

    NASA Technical Reports Server (NTRS)

    1996-01-01

    On this ninth day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz having completed five days of joint operations between the American astronauts and the Russian cosmonauts are seen flying solo once again after undocking from the Mir Space Station. As Atlantis/Mir flew over the Ural Mountains of central Asia, the docking hooks and latches that joined the vehicles together were commanded open and Atlantis drifted slowly away from Mir. Wilcutt then initiated a tail-forward fly-around of the Russian space station. After one and one-half revolutions around Mir, Atlantis' jets were fired in a separation maneuver to enable Atlantis to break away from Mir. On board Atlantis, the six-member crew is settling back into its normal routine with a fairly light schedule for the remainder of the day. Early in the morning as Atlantis flew over the United States, the crew took time to talk with anchors for the CBS Up to the Minute' network news broadcast.

  10. Satellite Docking Simulator with Generic Contact Dynamics Capabilities

    NASA Astrophysics Data System (ADS)

    Ma, O.; Crabtree, D.; Carr, R.; Gonthier, Y.; Martin, E.; Piedboeuf, J.-C.

    2002-01-01

    Satellite docking (and capture) systems are critical for the servicing or salvage of satellites. Satellite servicing has comparatively recently become a realistic and promising space operation/mission. Satellite servicing includes several of the following operations: rendezvous; docking (capturing); inspection; towing (transporting); refueling; refurbishing (replacement of faulty or "used-up" modules/boxes); and un-docking (releasing). Because spacecraft servicing has been, until recently non-feasible or non-economical, spacecraft servicing technology has been neglected. Accordingly, spacecraft designs have featured self- contained systems without consideration for operational servicing. Consistent with this view, most spacecrafts were designed and built without docking interfaces. If, through some mishap, a spacecraft was rendered non-operational, it was simply considered expendable. Several feasibility studies are in progress on salvaging stranded satellites (which, in fact had led to this project). The task of the designer of the docking system for a salvaging task is difficult. He/she has to work with whatever it is on orbit, and this excludes any special docking interfaces, which might have made his/her task easier. As satellite servicing becomes an accepted design requirement, many future satellites will be equipped with appropriate docking interfaces. The designer of docking systems will be faced with slightly different challenges: reliable, cost-effective, docking (and re-supply) systems. Thus, the role of designers of docking systems will increase from one of a kind, ad-hoc interfaces intended for salvaging operations, to docking systems for satellites and "caretaker" spacecraft which are meant for servicing and are produced in larger numbers. As in any space system (for which full and representative ground hardware test-beds are very expensive and often impossible to develop), simulations are mandatory for the development of systems and operations for satellite servicing. Simulations are also instrumental in concept studies during proposals and early development stages. Finally, simulations are useful during the operational phase of satellite servicing: improving the operational procedures; training ground operators; command and control, etc. Hence the need exists for a Satellite Servicing Simulator, which will support a project throughout its lifecycle. The paper addresses a project to develop a Simulink-based Satellite Docking Simulator (SDS) with generic Contact Dynamics (CD) capabilities. The simulator is intended to meet immediate practical demands for development of complex docking systems and operations at MD Robotics. The docking phase is the most critical and complex phase of the entire servicing sequence, and without docking there is no servicing. Docking mechanisms are often quite complex, especially when built to dock with a satellite manufactured without special docking interfaces. For successful docking operations, the design of a docking system must take into consideration: complexity of 3D geometric shapes defining the contact interfaces; sophistication of the docking mechanism; friction and stiction at the contacting surfaces; compliance (stiffness) and damping, in all axes; positional (translation and rotation) misalignments and relative velocities, in all axes; inertial properties of the docking satellites (including their distribution); complexity of the drive mechanisms and control sub-systems for the overall docking system; fully autonomous or tele-operated docking from the ground; etc. The docking simulator, which makes use of the proven Contact Dynamics Toolkit (CDT) developed by MD Robotics, is thus practically indispensable for the docking system designer. The use of the simulator could greatly reduce the prototyping and development time of a docking interface. A special feature of the simulator, which required an update of CDT, is variable step-size integration. This new capability permits increases in speed to accomplish all the simulation tasks.

  11. Multi-Conformer Ensemble Docking to Difficult Protein Targets

    DOE PAGES

    Ellingson, Sally R.; Miao, Yinglong; Baudry, Jerome; ...

    2014-09-08

    We investigate large-scale ensemble docking using five proteins from the Directory of Useful Decoys (DUD, dud.docking.org) for which docking to crystal structures has proven difficult. Molecular dynamics trajectories are produced for each protein and an ensemble of representative conformational structures extracted from the trajectories. Docking calculations are performed on these selected simulation structures and ensemble-based enrichment factors compared with those obtained using docking in crystal structures of the same protein targets or random selection of compounds. We also found simulation-derived snapshots with improved enrichment factors that increased the chemical diversity of docking hits for four of the five selected proteins.more » A combination of all the docking results obtained from molecular dynamics simulation followed by selection of top-ranking compounds appears to be an effective strategy for increasing the number and diversity of hits when using docking to screen large libraries of chemicals against difficult protein targets.« less

  12. KSC-98pc1855

    NASA Image and Video Library

    1998-12-15

    In the Space Station Processing Facility, workers on the floor watch as the overhead crane moves solar panels intended for the International Space Station (ISS). The panels are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of the Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend five days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed

  13. Understanding of empty container movement: A study on a bottleneck at an off-dock depot

    NASA Astrophysics Data System (ADS)

    Zain, Rosmaizura Mohd; Rahman, Mohd Nizam Ab; Nopiah, Zulkifli Mohd; Saibani, Nizaroyani

    2014-09-01

    Port not only function as connections between marine and land transportation but also as core business areas. In a port terminal, available space is limited, but the influx of container is growing. The off-dock depot is one of the key supply chain players that hold empty containers in the inventory. Therefore, this paper aims to identify the main factors of bottlenecks or congestion that hinder the rapid movement of empty containers from the off-dock depot to the customers. Thirty interviews were conducted with individuals who are key players in the container supply chain. The data were analyzed using Atlas.ti software and the analytic hierarchy process to rank the priority factors of bottlenecks. Findings show that several pertinent factors act as barriers to the key players in the container movement in the day-to-day operations. In future studies, strategies to overcome fragmentation in the container supply chain and logistics must be determined.

  14. ASTP - INSIGNIAS

    NASA Image and Video Library

    1975-01-01

    S75-20361 (27 Feb. 1975) --- This is the American crew insignia of the joint United States-USSR Apollo-Soyuz Test Project (ASTP) scheduled to take place in July 1975. Of circular design, the insignia has a colorful border area, outlined in red, with the names of the five crew members and the words Apollo in English and Soyuz in Russian around an artist?s concept of the Apollo and Soyuz spacecraft about to dock in Earth orbit. The bright sun and the blue and white Earth are in the background. The white stars on the blue background represent American astronauts Thomas P. Stafford, commander; Vance D. Brand, command module pilot; and Donald (Deke) K. Slayton, docking module pilot. The dark gold stars on the red background represent Soviet cosmonauts Aleksey A. Leonov, commander, and Valeriy N. Kubasov, engineer. Soyuz and Apollo will be launched separately from the USSR and United States, and will dock and remain together for as long as two days. The three Apollo astronauts will enter Soyuz and the two Soviet cosmonauts will visit the Apollo spacecraft via a docking module. The Russian word ?soyuz? means ?union? in English.

  15. Robot-assisted laparoscopic transperitoneal infrarenal lymphadenectomy in patients with locally advanced cervical cancer by single docking: Do we need a backup procedure?

    PubMed

    Gucer, Fatih; Misirlioglu, Selim; Ceydeli, Nuri; Taskiran, Cagatay

    2018-03-01

    To present our initial experience on the feasibility of robotic transperitoneal para-aortic lymphadenectomy up to left renal vein via single docking approach by high port insertion technique followed by left shoulder docking as a rescue backup procedure in surgically obstructed patients undergoing surgical staging because of locally advanced cervical cancer (LACC). Prospective observational preliminary study. Canadian Task Force classification II-3. Tertiary-care academic affiliated private hospital. Ten patients with LACC who underwent robotic transperitoneal infrarenal para-aortic lymphadenectomy between January 2012 and December 2014. All patients with pathologically proven cervical cancer underwent a PET/CT scanning in a similar fashion at the department of nuclear medicine. PET/CT scans were evaluated by the nuclear medicine specialist. Following pre-operative work-up, robot-assisted transperitoneal infrarenal para-aortic lymphadenectomy was performed up to left renal vein by the same experienced surgeon. Sections of 5 mm were performed and stained with routine hematoxylin and eosin (H&E), and node count was done separately by experienced gynecopathologist. During the study period, 12 consecutive patients with LACC were counseled for pre-therapeutic robot-assisted transperitoneal para-aortic lymphadenectomy. Two patients declined the procedure and underwent standardized chemo-radiation therapy whereas remaining ten patients constituted the study group. In the study group, the median age was 46 years (range 33-59 years), and the median body mass index 28.5 kg/m 2 (range 18.5-35.1 kg/m 2 ). Clinical staging was stage IIB in four patients, IIIB in four, and IVA in one. Histopathological diagnosis was squamous cell carcinoma in nine patients, and adenocarcinoma in one. On PET/CT scans, seven out of ten patients were positive for pelvic lymph node metastasis. With respect to para-aortic area, only one of the ten patients had suspected metastasis in PET/CT. For nine patients with LACC, the median docking time was 6.5 min (range 4-15 min), and the median operating time for para-aortic lymphadenectomy was 120 min (range 60-165 min). The median trocar time was 14.5 min (range 5-45 min). In two out of ten patients, the surgical removal of whole lymphatic tissue between inferior mesenteric artery and left renal vein was not completely possible by a single docking of robotic column. Therefore, a new optic trocar was placed in the umbilicus and the robotic column was relocated over the left shoulder of the patient and residual lymphatic tissue measuring approximately 2 cm in the long axis immediately below the left renal vein was removed and the surgery was completed up to the left renal vein. All para-aortic lymphadenectomies have been completed by robotic route. There were no intra-operative complications. No patient received a blood transfusion. Early post-operative grade 2 and 3a complications according to Dindo classification occurred in two patients: one symptomatic lymphocyst and one local infection on assistant port site in one patient. The patient with suspected para-aortic lymph node metastasis in PET/CT showed no metastatic disease on histopathologic exam of para-aortic lymph nodes. The patient with recurrent disease and negative para-aortic lymph nodes on frozen section examination underwent robot-assisted total pelvic exenteration. Five of the residual eight patients had histologically proven metastasis in the para-aortic lymph node(s). Treatment modification occurred in six patients related to pre-treatment staging surgery. According to pathological results, extended field radiation therapy has been added in five patients and it was omitted in one patient. The median time interval between surgery and initiation of radiotherapy was 12 days (range 6-23 days). Robotic transperitoneal infrarenal para-aortic lymphadenectomy up to left renal vein by high port insertion technique is a safe and feasible option for staging and treatment planning. However, technically, it is obstructed in a small group of patients and nodal staging surgery up to left renal vein can be completed by consecutive left shoulder docking approach as a backup rescue plan.

  16. KSC-97PC863

    NASA Image and Video Library

    1997-05-25

    KENNEDY SPACE CENTER, FLA. - Members of the STS-84 crew pause at Patrick Air force Base just prior to their departure for Johnson Space Center in Houston, Texas. They are (from left) Mission Specialist Jean-Francois Clervoy; returning astronaut and Mir 23 crew member Jerry M. Linenger; Mission Commander Charles J. Precourt; Mission Specialist Edward Tsang Lu; and Mission Specialist Elena V. Kondakova. The seven-member crew returned aboard the Space Shuttle Orbiter Atlantis May 24 on KSC's Runway 33 after the completion of a successful nine-day mission. STS-84 was the sixth docking of the Space Shuttle with the Russian Space Station MIr. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced Linenger, who had been on the Russian space station since Jan. 15. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale's stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences.

  17. KSC-97pc137

    NASA Image and Video Library

    1997-01-12

    STS-81 Mission Specialist Jerry Linenger waves to the camera in his launch/entry suit and helmet in the suitup room of the Operations and Checkout (O&C) Building. He is on his second Shuttle flight and has been an astronaut since 1992. Linenger will become a member of the Mir 22 crew and replace astronaut John Blaha on the Russian space station for a four-month stay after the Space Shuttle orbiter Atlantis docks with the orbital habitat on flight day 3. A medical doctor and an exercise buff, Linenger will conduct physiological experiments during his stay on Mir. He and five crew members will shortly depart the O&C and head for Launch Pad 39B, where the Space Shuttle Atlantis will lift off during a 7-minute window that opens at 4:27 a.m. EST, January 12

  18. Solar panels for the International Space Station are uncrated and moved in the SSPF

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Space Station Processing Facility, workers on the floor watch as the overhead crane moves solar panels intended for the International Space Station (ISS). The panels are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of the Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend five days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed.

  19. STS-84 Commander Charles J. Precourt in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Commander Charles J. Precourt prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  20. STS-84 Mission Specialist C. Michael Foale in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Mission Specialist C. Michael Foale prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  1. STS-84 Pilot Eileen Marie Collins in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Pilot Eileen M. Collins prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  2. KSC-97PC811

    NASA Image and Video Library

    1997-05-15

    STS-84 Mission Specialist Jean-Francois Clervoy prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  3. KSC-97PC807

    NASA Image and Video Library

    1997-05-15

    STS-84 Commander Charles J. Precourt prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  4. KSC-97PC806

    NASA Image and Video Library

    1997-05-15

    STS-84 Mission Specialist C. Michael Foale prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  5. KSC-97PC810

    NASA Image and Video Library

    1997-05-15

    STS-84 Mission Specialist Carlos I. Noriega prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  6. STS-84 Mission Specialist Jean-Francois Clervoy in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Mission Specialist Jean- Francois Clervoy prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  7. KSC-97PC808

    NASA Image and Video Library

    1997-05-15

    STS-84 Pilot Eileen M. Collins prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  8. STS-84 Mission Specialist Edward Tsang Lu in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Mission Specialist Edward T. Lu prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  9. KSC-97PC809

    NASA Image and Video Library

    1997-05-15

    STS-84 Mission Specialist Edward T. Lu prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  10. STS-84 Mission Specialist Elena V. Kondakova in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Mission Specialist Elena V. Kondakova prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  11. STS-84 Mission Specialist Carlos I. Noriega in white room

    NASA Technical Reports Server (NTRS)

    1997-01-01

    KENNEDY SPACE CENTER, FLA. -- STS-84 Mission Specialist Carlos I. Noriega prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew.

  12. KSC-97PC812

    NASA Image and Video Library

    1997-05-15

    STS-84 Mission Specialist Elena V. Kondakova prepares to enter the Space Shuttle Atlantis at Launch Pad 39A with help from white room closeout crew members. The fourth Shuttle mission of 1997 will be the sixth docking of the Space Shuttle with the Russian Space Station Mir. The commander is Charles J. Precourt. The pilot is Eileen Marie Collins. The five mission specialists are C. Michael Foale, Carlos I. Noriega, Edward Tsang Lu, Jean-Francois Clervoy of the European Space Agency and Elena V. Kondakova of the Russian Space Agency. The planned nine-day mission will include the exchange of Foale for U.S. astronaut and Mir 23 crew member Jerry M. Linenger, who has been on Mir since Jan. 15. Linenger transferred to Mir during the last docking mission, STS-81; he will return to Earth on Atlantis. Foale is slated to remain on Mir for about four months until he is replaced in September by STS-86 Mission Specialist Wendy B. Lawrence. During the five days Atlantis is scheduled to be docked with the Mir, the STS-84 crew and the Mir 23 crew, including two Russian cosmonauts, Commander Vasily Tsibliev and Flight Engineer Alexander Lazutkin, will participate in joint experiments. The STS-84 mission also will involve the transfer of more than 7,300 pounds of water, logistics and science equipment to and from the Mir. Atlantis is carrying a nearly 300-pound oxygen generator to replace one of two Mir units which have experienced malfunctions. The oxygen it generates is used for breathing by the Mir crew

  13. Soyuz Spacecraft

    NASA Image and Video Library

    2014-11-12

    ISS038-E-000250 (12 Nov. 2013) --- The Russian Soyuz TMA-11M spacecraft dominates this image exposed by one of the Expedition 38 crew members aboard the International Space Station over Earth on Nov. 12. Now docked to the Rassvet or Mini-Research Module 1 (MRM-1), the spacecraft had delivered three crew members to the orbital outpost five days earlier, temporarily bringing the total population to nine aboard the station.

  14. Olivas uses communication equipment on the FD during Joint Operations

    NASA Image and Video Library

    2007-06-13

    S117-E-07194 (13 June 2007) --- Astronaut John "Danny" Olivas, STS-117 mission specialist, uses a communication system while looking over procedures checklists on the flight deck of Space Shuttle Atlantis during flight day six activities while docked with the International Space Station.

  15. Olivas uses communication equipment on the FD during Joint Operations

    NASA Image and Video Library

    2007-06-13

    S117-E-07192 (13 June 2007) --- Astronaut John "Danny" Olivas, STS-117 mission specialist, uses a communication system while looking over procedures checklists on the flight deck of Space Shuttle Atlantis during flight day six activities while docked with the International Space Station.

  16. Cholecystectomy using a novel Single-Site(®) robotic platform: early experience from 45 consecutive cases.

    PubMed

    Konstantinidis, Konstantinos M; Hirides, Petros; Hirides, Savas; Chrysocheris, Pericles; Georgiou, Michael

    2012-09-01

    The aim of this work was to study the feasibility, safety, and efficacy of single-incision robotic cholecystectomy using a novel platform from Intuitive Surgical. All operations were performed by the same surgeon. Parameters assessed included patient history, indication for surgery, operation time, complication rate, conversion rate, robot-related issues, length of hospital stay, postoperative pain, and time to return to work. All patients were followed for a 2-month period postoperatively. Forty-five patients (22 women, 23 men) underwent single-incision robotic cholecystectomy from March 1 to July 15, 2011. There were no conversions to either conventional laparoscopy or laparotomy, although in three cases a second trocar was used. There were no major complications apart from a single case of postoperative hemorrhage. Average patient age was 47 ± 12 years (range = 27-80 years) and average BMI was 30 kg/m(2) (mean = 28.8 ± 4 kg/m(2), range = 18.4-46.7 kg/m(2)). The primary indication for surgery was gallstones. The mean operation time (skin-to-skin) was 84.5 ± 25.5 min (range = 51-175 min), docking time was 5.8 ± 1.5 min (range = 4-11 min), and console time (net surgical time) was 43 ± 21.9 min (range = 21-121 min). Intraoperative blood loss was negligible. There were no collisions between the robotic arms and no other robot-related problems. Average postoperative length of stay was less than 24 h. The mean Visual Analog Pain Scale Score 6 h after the operation was 2.2 ± 1.51 (range = 0-6) and patients returned to normal activities in 4.48 ± 2.3 days (range = 1-9 days). Single-Site(®) is a new platform offering a potentially more stable and reliable environment to perform single-port cholecystectomy. Both simple and complicated cholecystectomies can be performed with safety. The technique is possible in patients with a high BMI. The induction of pneumoperitoneum using the new port and the docking process require additional training.

  17. Flight deck activity during flyaround of Mir Space Station

    NASA Image and Video Library

    1996-04-19

    STS076-316-008 (23 March 1996) --- On the aft flight deck of the Space Shuttle Atlantis, astronaut Linda M. Godwin uses a hand-held laser instrument to check the range of Russia's Mir Space Station during docking operations. The two spacecraft were in the process of making their third docking in Earth-orbit. With the subsequent delivery of astronaut Shannon W. Lucid to the Mir, the Mir-21 crew grew from two to three, as the mission specialist quickly becomes a cosmonaut guest researcher. Lucid will spend approximately 140 days on Mir before returning to Earth.

  18. STS-114 Discovery's approach for docking

    NASA Image and Video Library

    2005-07-28

    ISS011-E-11258 (28 July 2005) --- View of the Space Shuttle Discovery as photographed during the survey operations performed by the Expedition 11 crew on the International Space Station during the STS-114 R-Bar Pitch Maneuver on Flight Day 3. Discovery docked to the station at 6:18 a.m. (CDT) on Thursday, July 28, 2005. Parts of Switzerland are in the background. Onboard the shuttle were astronauts Eileen M. Collins, STS-114 commander; James M. Kelly, pilot; Andrew S. W. Thomas, Stephen K. Robinson, Wendy B. Lawrence, Charles J. Camarda and Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi, all mission specialists.

  19. 9 CFR 355.15 - Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... storage rooms; outer premises, docks, driveways, etc.; fly-breeding material; nuisances. 355.15 Section....15 Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly... departments where certified products are prepared, handled, or stored. Docks and areas where cars and vehicles...

  20. 9 CFR 355.15 - Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... storage rooms; outer premises, docks, driveways, etc.; fly-breeding material; nuisances. 355.15 Section....15 Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly... departments where certified products are prepared, handled, or stored. Docks and areas where cars and vehicles...

  1. 9 CFR 355.15 - Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... storage rooms; outer premises, docks, driveways, etc.; fly-breeding material; nuisances. 355.15 Section....15 Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly... departments where certified products are prepared, handled, or stored. Docks and areas where cars and vehicles...

  2. Assessment of Spatial Navigation and Docking Performance During Simulated Rover Tasks

    NASA Technical Reports Server (NTRS)

    Wood, S. J.; Dean, S. L.; De Dios, Y. E.; Moore, S. T.

    2010-01-01

    INTRODUCTION: Following long-duration exploration transits, pressurized rovers will enhance surface mobility to explore multiple sites across Mars and other planetary bodies. Multiple rovers with docking capabilities are envisioned to expand the range of exploration. However, adaptive changes in sensorimotor and cognitive function may impair the crew s ability to safely navigate and perform docking tasks shortly after transition to the new gravitoinertial environment. The primary goal of this investigation is to quantify post-flight decrements in spatial navigation and docking performance during a rover simulation. METHODS: Eight crewmembers returning from the International Space Station will be tested on a motion simulator during four pre-flight and three post-flight sessions over the first 8 days following landing. The rover simulation consists of a serial presentation of discrete tasks to be completed within a scheduled 10 min block. The tasks are based on navigating around a Martian outpost spread over a 970 sq m terrain. Each task is subdivided into three components to be performed as quickly and accurately as possible: (1) Perspective taking: Subjects use a joystick to indicate direction of target after presentation of a map detailing current orientation and location of the rover with the task to be performed. (2) Navigation: Subjects drive the rover to the desired location while avoiding obstacles. (3) Docking: Fine positioning of the rover is required to dock with another object or align a camera view. Overall operator proficiency will be based on how many tasks the crewmember can complete during the 10 min time block. EXPECTED RESULTS: Functionally relevant testing early post-flight will develop evidence regarding the limitations to early surface operations and what countermeasures are needed. This approach can be easily adapted to a wide variety of simulated vehicle designs to provide sensorimotor assessments for other operational and civilian populations.

  3. ISS during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006777 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  4. ISS during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006784 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  5. ISS Segments during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006787 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  6. ISS during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006700 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  7. ISS during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006698 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  8. ISS during STS-135 Approach

    NASA Image and Video Library

    2011-07-10

    S135-E-006702 (10 July 2011) --- This is one of a series of images showing the International Space Station photographed by a crewmember onboard the space shuttle Atlantis as the two spacecraft performed rendezvous and docking operations on the STS-135 mission's third day in Earth orbit. Photo credit: NASA

  9. Hatch opening

    NASA Image and Video Library

    2005-07-28

    S114-E-5508 (28 July 2005) --- Astronaut Eileen M. Collins, STS-114 commander, prepares to open the hatch that will lead her and the entire Discovery crew into the International Space Station. This was just one highlight of a very busy day that earlier saw the flawless rendezvous and docking operations between the shuttle and the orbital outpost.

  10. Nowak reads a checklist during OBSS berthing operations on STS-121

    NASA Image and Video Library

    2006-07-05

    S121-E-05401 (5 July 2006) --- Astronaut Lisa M. Nowak, STS-121 mission specialist, uses a handy reference manual while stationed at the controls on the aft flight deck of the Space Shuttle Discovery. She is preparing for the next day's activities which include docking with the International Space Station.

  11. Nowak reads a checklist during OBSS berthing operations on STS-121

    NASA Image and Video Library

    2006-07-05

    S121-E-05402 (5 July 2006) --- Astronaut Lisa M. Nowak, STS-121 mission specialist, uses a handy reference manual while stationed at the controls on the aft flight deck of the Space Shuttle Discovery. She is preparing for the next day's activities which include docking with the International Space Station.

  12. Project EGRESS: Earthbound Guaranteed Reentry from Space Station. the Design of an Assured Crew Recovery Vehicle for the Space Station

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Unlike previously designed space-based working environments, the shuttle orbiter servicing the space station will not remain docked the entire time the station is occupied. While an Apollo capsule was permanently available on Skylab, plans for Space Station Freedom call for a shuttle orbiter to be docked at the space station for no more than two weeks four times each year. Consideration of crew safety inspired the design of an Assured Crew Recovery Vehicle (ACRV). A conceptual design of an ACRV was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in space station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on space station operations, interfaces and docking facilities, and maintenance needs. A water-landing medium-lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing safety and reliability requirements. One or more seriously injured crew members could be returned to an earth-based health facility with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow a full evacuation of the space station. The craft could be constructed entirely with available 1990 technology, and launched aboard a shuttle orbiter.

  13. Manned versus unmanned rendezvous and capture

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.

    1991-01-01

    Rendezvous and capture (docking) operations may be performed either automatically or under manual control. In cases where humans are far from the mission site, or high-bandwidth communications lines are not in place, automation is the only option. Such might be the case with unmanned missions to the moon or Mars that involve orbital docking or cargo transfer. In crewed situations where sensors, computation capabilities, and other necessary instrumentation are unavailable, manual control is the only alternative. Power, mass, cost, or other restrictions may limit the availability of the machinery required for an automated rendezvous and capture. The only occasions for which there is a choice about whether to use automated or manual control are those where the vehicle(s) have both the crew and instrumentation necessary to perform the mission either way. The following discussion will focus on the final approach or capture (docking) maneuver. The maneuvers required for long-range rendezvous operations are calculated by computers. It is almost irrelevant whether it is an astronaut, watching a count-down timer who pushes the button firing the thruster or whether the computer keeps track of the time and fires with the astronaut monitoring. The actual manual workload associated with a mission that may take as long as hours or days to perform is small. The workload per unit time increases tremendously during the final approach (docking) phase and this is where the issue of manual versus automatic is more important.

  14. KSC-97PC853

    NASA Image and Video Library

    1997-05-24

    STS-84 crew members give a "thumbs up" to press representatives and other onlookers on KSC’s Runway 33 after landing of the successful nine-day mission. From left, are Mission Specialist Jean-Francois Clervoy of the European Space Agency, Pilot Eileen Marie Collins, Commander Charles J. Precourt, Mission Specialist Elene V. Kondakova of the Russian Space Agency, and Mission Specialist Carlos I. Noriega. Not shown are Mission Specialist Edward Tsang Lu and returning astronaut and Mir 23 crew member Jerry M. Linenger. STS-84 was the sixth docking of the Space Shuttle with the Russian Space Station Mir. The Space Shuttle orbiter Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced Linenger, who has been on the Russian space station since Jan. 15. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  15. Spacelab-Mir Module Lift in Operations and Checkout Building,

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The STS-71 Spacelab-Mir module is lifted by overhead crane from a test stand in the Operations and Checkout (O&C) Building after final checkout work is completed by the KSC payload processing team. the module will be integrated into the payload bay of the Space Shuttle orbiter Atlantis. During the 11-day mission, the module will serve as an orbital medical laboratory where joint U.S.-Russian investigations will be conducted on the physiological effects of long-duration spaceflight. Also on board Atlantis will be the Orbiter Docking System (ODS) that will permit the link-up of Atlantis and the Russian Mir Space Station. STS-71 is the first of seven planned docking missions. The Spacelab-Mir also carries supplies for the two Russian Mir 19 crew members who will liftoff as a part of the STS-71 crew and later transfer into the space station.

  16. Artist concept illustrating key events on day by day basis during Apollo 9

    NASA Technical Reports Server (NTRS)

    1969-01-01

    Artist concept illustrating key events on day by day basis during Apollo 9 mission. First photograph illustrates activities on the first day of the mission, including flight crew preparation, orbital insertion, 103 north mile orbit, separations, docking and docked Service Propulsion System Burn (19792); Second day events include landmark tracking, pitch maneuver, yaw-roll maneuver, and high apogee orbits (19793); Third day events include crew transfer and Lunar Module system evaluation (19794); Fourth day events include use of camera, day-night extravehicular activity, use of golden slippers, and television over Texas and Louisiana (19795); Fifth day events include vehicles undocked, Lunar Module burns for rendezvous, maximum separation, ascent propulsion system burn, formation flying and docking, and Lunar Module jettison ascent burn (19796); Sixth thru ninth day events include service propulsion system burns and landmark sightings, photograph special tests (19797); Tenth day events i

  17. A High Performance Cloud-Based Protein-Ligand Docking Prediction Algorithm

    PubMed Central

    Chen, Jui-Le; Yang, Chu-Sing

    2013-01-01

    The potential of predicting druggability for a particular disease by integrating biological and computer science technologies has witnessed success in recent years. Although the computer science technologies can be used to reduce the costs of the pharmaceutical research, the computation time of the structure-based protein-ligand docking prediction is still unsatisfied until now. Hence, in this paper, a novel docking prediction algorithm, named fast cloud-based protein-ligand docking prediction algorithm (FCPLDPA), is presented to accelerate the docking prediction algorithm. The proposed algorithm works by leveraging two high-performance operators: (1) the novel migration (information exchange) operator is designed specially for cloud-based environments to reduce the computation time; (2) the efficient operator is aimed at filtering out the worst search directions. Our simulation results illustrate that the proposed method outperforms the other docking algorithms compared in this paper in terms of both the computation time and the quality of the end result. PMID:23762864

  18. DARC 2.0: Improved Docking and Virtual Screening at Protein Interaction Sites

    PubMed Central

    Gowthaman, Ragul; Lyskov, Sergey; Karanicolas, John

    2015-01-01

    Over the past decade, protein-protein interactions have emerged as attractive but challenging targets for therapeutic intervention using small molecules. Due to the relatively flat surfaces that typify protein interaction sites, modern virtual screening tools developed for optimal performance against “traditional” protein targets perform less well when applied instead at protein interaction sites. Previously, we described a docking method specifically catered to the shallow binding modes characteristic of small-molecule inhibitors of protein interaction sites. This method, called DARC (Docking Approach using Ray Casting), operates by comparing the topography of the protein surface when “viewed” from a vantage point inside the protein against the topography of a bound ligand when “viewed” from the same vantage point. Here, we present five key enhancements to DARC. First, we use multiple vantage points to more accurately determine protein-ligand surface complementarity. Second, we describe a new scheme for rapidly determining optimal weights in the DARC scoring function. Third, we incorporate sampling of ligand conformers “on-the-fly” during docking. Fourth, we move beyond simple shape complementarity and introduce a term in the scoring function to capture electrostatic complementarity. Finally, we adjust the control flow in our GPU implementation of DARC to achieve greater speedup of these calculations. At each step of this study, we evaluate the performance of DARC in a “pose recapitulation” experiment: predicting the binding mode of 25 inhibitors each solved in complex with its distinct target protein (a protein interaction site). Whereas the previous version of DARC docked only one of these inhibitors to within 2 Å RMSD of its position in the crystal structure, the newer version achieves this level of accuracy for 12 of the 25 complexes, corresponding to a statistically significant performance improvement (p < 0.001). Collectively then, we find that the five enhancements described here – which together make up DARC 2.0 – lead to dramatically improved speed and performance relative to the original DARC method. PMID:26181386

  19. Safety in earth orbit study. Volume 2: Analysis of hazardous payloads, docking, on-board survivability

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Detailed and supporting analyses are presented of the hazardous payloads, docking, and on-board survivability aspects connected with earth orbital operations of the space shuttle program. The hazards resulting from delivery, deployment, and retrieval of hazardous payloads, and from handling and transport of cargo between orbiter, sortie modules, and space station are identified and analyzed. The safety aspects of shuttle orbiter to modular space station docking includes docking for assembly of space station, normal resupply docking, and emergency docking. Personnel traffic patterns, escape routes, and on-board survivability are analyzed for orbiter with crew and passenger, sortie modules, and modular space station, under normal, emergency, and EVA and IVA operations.

  20. Total robotic radical rectal resection with da Vinci Xi system: single docking, single phase technique.

    PubMed

    Tamhankar, Anup Sunil; Jatal, Sudhir; Saklani, Avanish

    2016-12-01

    This study aims to assess the advantages of Da Vinci Xi system in rectal cancer surgery. It also assesses the initial oncological outcomes after rectal resection with this system from a tertiary cancer center in India. Robotic rectal surgery has distinct advantages over laparoscopy. Total robotic resection is increasing following the evolution of hybrid technology. The latest Da Vinci Xi system (Intuitive Surgical, Sunnyvale, USA) is enabled with newer features to make total robotic resection possible with single docking and single phase. Thirty-six patients underwent total robotic resection in a single phase and single docking. We used newer port positions in a straight line. Median distance from the anal verge was 4.5 cm. Median robotic docking time and robotic procedure time were 9 and 280 min, respectively. Median blood loss was 100 mL. One patient needed conversion to an open approach due to advanced disease. Circumferential resection margin and longitudinal resection margins were uninvolved in all other patients. Median lymph node yield was 10. Median post-operative stay was 7 days. There were no intra-operative adverse events. The latest Da Vinci Xi system has made total robotic rectal surgery feasible in single docking and single phase. With the new system, four arm total robotic rectal surgery may replace the hybrid technique of laparoscopic and robotic surgery for rectal malignancies. The learning curve for the new system appears to be shorter than anticipated. Early perioperative and oncological outcomes of total robotic rectal surgery with the new system are promising. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  1. Orion Handling Qualities During ISS Proximity Operations and Docking

    NASA Technical Reports Server (NTRS)

    Stephens, John-Paul; Vos, Gordon A.; Bilimoria, Karl D.; Mueller, Eric R.; Brazzel, Jack; Spehar, Pete

    2011-01-01

    NASA's Orion spacecraft is designed to autonomously rendezvous and dock with many vehicles including the International Space Station. However, the crew is able to assume manual control of the vehicle s attitude and flight path. In these instances, Orion must meet handling qualities requirements established by NASA. Two handling qualities assessments were conducted at the Johnson Space Center to evaluate preliminary designs of the vehicle using a six degree of freedom, high-fidelity guidance, navigation, and control simulation. The first assessed Orion s handling qualities during the last 20 ft before docking, and included both steady and oscillatory motions of the docking target. The second focused on manual acquisition of the docking axis during the proximity operations phase and subsequent station-keeping. Cooper-Harper handling qualities ratings, workload ratings and comments were provided by 10 evaluation pilots for the docking study and 5 evaluation pilots for the proximity operations study. For the docking task, both cases received 90% Level 1 (satisfactory) handling qualities ratings, exceeding NASA s requirement. All ratings for the ProxOps task were Level 1. These evaluations indicate that Orion is on course to meet NASA's handling quality requirements for ProxOps and docking.

  2. Overall view of Mission Operations Control in Mission Control Center

    NASA Image and Video Library

    1969-05-18

    S69-34316 (18 May 1969) --- Overall view of the Mission Operations Control Room in the Mission Control Center, Building 30, on the first day of the Apollo 10 lunar orbit mission. A color television transmission was being received from Apollo 10. This picture was made following Command and Service Module/Lunar Module/Saturn IVB (CSM/LM-S-IVB) separation and prior to LM extraction from the S-IVB. The CSM were making the docking approach to the LM/S-IVB.

  3. DefenseLink Feature: Travels with Mullen

    Science.gov Websites

    . Mullen's visit to El Salvador wraps up a five-day trip to the U.S. Southern Command area of operations. U.S . Mullen's visit to El Salvador wraps up a five-day trip to the U.S. Southern Command area of operations five-day trip to the U.S. Southern Command area of operations, Jan.18, 2008. Jan. 22, 2008 Mullen

  4. Astronaut Vance Brand practices operating Docking Module hatch for ASTP

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Astronaut Vance D. Brand, command module pilot of the American Apollo Soyuz Test Project (ASTP) prime crew, practices operating a Docking Module hatch during ASTP pre-flight training at JSC. The Docking Module is designed to link the Apollo and Soyuz spacecraft during their docking in Earth orbit mission. Gary L. Doerre of JSC's Crew Training and Procedures Division is working with Brand. Doerre is wearing a face mask to help prevent possible exposure to Brand of disease prior to the ASTP launch.

  5. Parapharyngeal space surgery via a transoral approach using a robotic surgical system: transoral robotic surgery.

    PubMed

    Park, Young Min; De Virgilio, Armando; Kim, Won Shik; Chung, Hyun Pil; Kim, Se-Heon

    2013-03-01

    In transoral robotic surgery (TORS), if an endoscopic arm equipped with two integrated cameras is placed close to a lesion, a three-dimensionally magnified view of the operative field can be obtained. More important is that the operation can be performed precisely and bimanually using two instrument arms that can move freely within a limited working space. We performed TORS to treat several diseases that occur in the parapharyngeal space (PPS) and subsequently analyzed the treatment outcomes to confirm the validity of this procedure. Between February 2009 and February 2012, 11 patients who required surgical treatment for the removal of a parapharyngeal lesion were enrolled in this prospective study. Nine patients received TORS for parapharyngeal tumor resection, and 2 patients with stylohyoid syndrome underwent TORS for resection of an elongated styloid process. The average age of the patients included in this study was 42 years. Five patients were male, and 6 patients were female. TORS was successfully performed in all 11 patients. The average robotic system docking and operation times were 9.9 minutes (range, 5-24 minutes) and 54.2 minutes (range, 26-150 minutes), respectively. Patients were able to swallow normally the day after the operation. The average blood loss during the robotic operation was minimal (11.8 mL). The average hospital stay was 2.6 days. There were no significant complications in the perioperative or postoperative period. All patients were extremely satisfied with their cosmetic outcomes. PPS surgery via a transoral approach using a robotic surgical system is technically feasible and secures a better cosmetic outcome than the transcervical, transparotid, or transmandibular approach. This new surgical method is safe and effective for benign diseases of the PPS.

  6. STS-74 leaves O&C Building for TCDT

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The STS-74 flight crew walks out of the Operations and Checkout Building on their way to conduct Terminal Countdown Demostration Test (TCDT) exercises while aboard the Space Shuttle orbiter Atlantis at Launch Pad 39A. They are (from right): Mission Commander Kenneth Cameron; Pilot James Halsell; and Mission Specialists William McArthur Jr., Chris Hadfield, and Jerry Ross (back). Hadfield is an international mission specialist representing the Canadian Space Agency. This flight will feature the second docking of the Space Shuttle with the Russian Mir space station. Docking operations will be conducted with the Russian-built Docking Module attached to the end of the Orbiter Docking System (ODS) located in Atlantis payload bay. The DM will be left attached to the Mir when Atlantis undocks. This module will serve as a means to improve future Shuttle-Mir docking operations.

  7. Space Tug Docking Study. Volume 1: Executive Summary

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Results of a detailed systems analysis of the entire rendezvous and docking operation to be performed by the all-up space tug are presented. Specific areas investigated include: generating of operational requirements and a data base of candidate operational techniques and subsystem mechanizations; selection and ranking of integrated system designs capable of meeting the requirements generated; and definition of this simulation/demonstration program required to select and prove the most effective manual, autonomous, and hybrid rendezvous and docking systems.

  8. Positive human contact on the first day of life alters the piglet's behavioural response to humans and husbandry practices.

    PubMed

    Muns, Ramon; Rault, Jean-Loup; Hemsworth, Paul

    2015-11-01

    This experiment examined the effects of positive human contact at suckling on the first day of life on the behavioural and physiological responses of piglets to both humans and routine husbandry procedures. Forty litters from multiparous sows were randomly allocated to one of two treatments: Control (CC, minimal human interaction with day-old piglets) or Positive Contact (PC, human talking and caressing piglets during 6 suckling bouts on their first day of life, day 1). In each litter, 2 males and 2 females were randomly selected and their behavioural responses to tail docking (day 2), and to an experimenter (day 35) were studied. Escape behaviour at tail docking was assessed according to intensity (on a scale from 0 to 4 representing no movement to high intensity movement) and duration (on a scale from 0 to 3 representing no movement to continuous movement). At day 15 of age, a human approach and avoidance test was performed on focal piglets and at day 15, escape behaviour to capture before and after testing was recorded again. Blood samples for cortisol analysis were obtained from the focal piglets 30 min after tail docking and 1 h after weaning. Escape behaviour to tail docking of the PC piglets was of shorter duration than that of the CC piglets (P = 0.05). There was a tendency for the escape behaviour both before and after testing at day 15 to be of a lower intensity (P = 0.11 and P = 0.06, respectively) and a shorter duration (P = 0.06 and P = 0.08, respectively) in the PC piglets. There was a tendency for PC piglets to have higher cortisol concentrations after tail docking than the CC piglets (P = 0.07). Male piglets had higher cortisol concentrations after tail docking and after weaning than female piglets (P = 0.02 and P = 0.03). The results indicate that Positive Contact treatment reduced the duration of escape behaviour of piglets to tail docking. The role of classical conditioning, habituation and developmental changes in the observed effects of the Positive Contact treatment is unclear. Nonetheless, this experiment demonstrated that brief positive human contacts early in life can alter the behavioural responses of piglets to subsequent stressful events.

  9. Acquisition of Skill Proficiency Over Multiple Sessions of a Novel Rover Simulation

    NASA Technical Reports Server (NTRS)

    Dean, S. L.; DeDios,Y. E.; MacDougall, H. G.; Moore, S. T.; Wood, S. J.

    2011-01-01

    Following long-duration exploration transits, adaptive changes in sensorimotor function may impair the crew's ability to safely perform manual control tasks such as operating pressurized rovers. Postflight performance will also be influenced by the level of preflight skill proficiency they have attained. The purpose of this study was to characterize the acquisition of skills in a motion-based rover simulation over multiple sessions, and to investigate the effects of varying the simulation scenarios. METHODS: Twenty healthy subjects were tested in 5 sessions, with 1-3 days between sessions. Each session consisted of a serial presentation of 8 discrete tasks to be completed as quickly and accurately as possible. Each task consisted of 1) perspective-taking, using a map that defined a docking target, 2) navigation toward the target around a Martian outpost, and 3) docking a side hatch of the rover to a visually guided target. The simulator utilized a Stewart-type motion base (CKAS, Australia), single-seat cabin with triple scene projection covering 150 deg horizontal by 50 deg vertical, and joystick controller. Subjects were randomly assigned to a control group (tasks identical in the first 4 sessions) or a varied-practice group. The dependent variables for each task included accuracy toward the target and time to completion. RESULTS: The greatest improvements in time to completion occurred during the docking phase. The varied-practice group showed more improvement in perspective-taking accuracy. Perspective-taking accuracy was also affected by the relative orientation of the rover to the docking target. Skill acquisition was correlated with self-ratings of previous gaming experience. DISCUSSION: Varying task selection and difficulty will optimize the preflight acquisition of skills when performing novel operational tasks. Simulation of operational manual control will provide functionally relevant evidence regarding the impact of sensorimotor adaptation on early surface operations and what countermeasures are needed. Learning Objective: The use of a motion-based simulation to investigate decrements in the proficiency to operate pressurized rovers during early surface operations of space exploration missions, along with the acquisition of skill proficiency needed during the preflight phase of the mission.

  10. STS-81 Post Flight Presentation

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The flight crew of the STS-81 mission, Commander Michael A. Baker, Pilot Brent W. Jett Jr, and Mission Specialists John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and Jerry M. Linenger present a video mission over-view of their space flight. Images include prelaunch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also included are various panoramic views of the shuttle on the pad. The crew can be seen being readied in the "white room" for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. During the presentation the astronauts take turns discussing aspects of the mission including: the SPACEHAB a double module that provides additional middeck locker space for secondary experiments. During the five days of docked operations with Mir, the crews is seen transferring water and supplies from one spacecraft to the other.

  11. Developing a cross-docking network design model under uncertain environment

    NASA Astrophysics Data System (ADS)

    Seyedhoseini, S. M.; Rashid, Reza; Teimoury, E.

    2015-06-01

    Cross-docking is a logistic concept, which plays an important role in supply chain management by decreasing inventory holding, order packing, transportation costs and delivery time. Paying attention to these concerns, and importance of the congestion in cross docks, we present a mixed-integer model to optimize the location and design of cross docks at the same time to minimize the total transportation and operating costs. The model combines queuing theory for design aspects, for that matter, we consider a network of cross docks and customers where two M/M/c queues have been represented to describe operations of indoor trucks and outdoor trucks in each cross dock. To prepare a perfect illustration for performance of the model, a real case also has been examined that indicated effectiveness of the proposed model.

  12. Space Shuttle Program (SSP) Dual Docked Operations (DDO)

    NASA Technical Reports Server (NTRS)

    Sills, Joel W., Jr.; Bruno, Erica E.

    2016-01-01

    This document describes the concept definition, studies, and analysis results generated by the Space Shuttle Program (SSP), International Space Station (ISS) Program (ISSP), and Mission Operations Directorate for implementing Dual Docked Operations (DDO) during mated Orbiter/ISS missions. This work was performed over a number of years. Due to the ever increasing visiting vehicle traffic to and from the ISS, it became apparent to both the ISSP and the SSP that there would arise occasions where conflicts between a visiting vehicle docking and/or undocking could overlap with a planned Space Shuttle launch and/or during docked operations. This potential conflict provided the genesis for evaluating risk mitigations to gain maximum flexibility for managing potential visiting vehicle traffic to and from the ISS and to maximize launch and landing opportunities for all visiting vehicles.

  13. KSC-97PC840

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis glides in for a landing on Runway 33 at KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. It will be the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and Jean-Francois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  14. STS-112 Flight Day 3 Highlights

    NASA Technical Reports Server (NTRS)

    2002-01-01

    During the third flight day of STS-112 (Commander Jeff Ashby, Pilot Pam Melroy and Mission Specialists Sandy Magnus, Piers Sellers, David Wolf and Fyodor Yurchikhin), the Space Shuttle Atlantis begins its final approach to the International Space Station (ISS) with which it will dock. The Chinese mainland is seen, at night, at a height of 242 statute miles. In one section of video from a camera onboard the ISS, Atlantis can be seen to be almost directly below the station, at a distance of several hundred feet. The orbiter's docking system is shown, as it is slowly guided by Ashby towards the forward docking port on the ISS's Destiny Laboratory Module and its forward docking port. Above the docking port, the S0 truss structure can be seen, to which the S1 truss structure in Atlantis' payload bay will be attached during this mission. Also seen are the Unity airlock and other modules. Following the completion of docking, in which an excellent shot of the docking system in hard dock is visible, the hatches between the two crafts are opened and the members of Atlantis are greeted by the very excited members of Expedition 5, who have been aboard the ISS for several months.

  15. KSC-02PD0336

    NASA Image and Video Library

    2002-03-19

    KENNEDY SPACE CENTER, FLA. - In the Operations and Checkout Building, the Integrated Truss Structure S0 is ready for transport to the launch pad on mission STS-110. Scheduled for launch April 4, the 11-day mission will feature Space Shuttle Atlantis docking with the International Space Station (ISS) and delivering the S0 truss, the centerpiece-segment of the primary truss structure that will eventually extend over 300 feet

  16. New docking target taped to middeck locker

    NASA Image and Video Library

    1996-09-20

    STS79-E-5104 (20 September 1996) --- The STS-79 crew members removed the docking target from the Docking Module (DM) and attached it to a locker door to photograph it and examine a slight peel on the surface, during Flight Day 5.

  17. STS-74 Flight Day 3

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On this third day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hadfield successfully connect the Russian-made docking module to the Space Shuttle using the shuttle's robot arm. There is a live, in-orbit press interview with the astronauts from inside the Russian docking module regarding the status of the mission thus far. The docking module will remain with Mir after the two spacecraft have undocked.

  18. STS-74 flight day 3

    NASA Astrophysics Data System (ADS)

    1995-11-01

    On this third day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hatfield successfully connect the Russian-made docking module to the Space Shuttle using the shuttle's robot arm. There is a live, in-orbit press interview with the astronauts from inside the Russian docking module regarding the status of the mission thus far. The docking module will remain with Mir after the two spacecraft have undocked.

  19. Low Impact Docking System (LIDS)

    NASA Technical Reports Server (NTRS)

    LaBauve, Tobie E.

    2009-01-01

    Since 1996, NASA has been developing a docking system that will simplify operations and reduce risks associated with mating spacecraft. This effort has focused on developing and testing an original, reconfigurable, active, closed-loop, force-feedback controlled docking system using modern technologies. The primary objective of this effort has been to design a docking interface that is tunable to the unique performance requirements for all types of mating operations (i.e. docking and berthing, autonomous and piloted rendezvous, and in-space assembly of vehicles, modules and structures). The docking system must also support the transfer of crew, cargo, power, fluid, and data. As a result of the past 10 years of docking system advancement, the Low Impact Docking System or LIDS was developed. The current LIDS design incorporates the lessons learned and development experiences from both previous and existing docking systems. LIDS feasibility was established through multiple iterations of prototype hardware development and testing. Benefits of LIDS include safe, low impact mating operations, more effective and flexible mission implementation with an anytime/anywhere mating capability, system level redundancy, and a more affordable and sustainable mission architecture with reduced mission and life cycle costs. In 1996 the LIDS project, then known as the Advanced Docking Berthing System (ADBS) project, launched a four year developmental period. At the end of the four years, the team had built a prototype of the soft-capture hardware and verified the control system that will be used to control the soft-capture system. In 2001, the LIDS team was tasked to work with the X- 38 Crew Return Vehicle (CRV) project and build its first Engineering Development Unit (EDU).

  20. STS-74 flight day 4

    NASA Astrophysics Data System (ADS)

    1995-11-01

    On this fourth day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hatfield, perform a successful docking between the space shuttle and the Mir space station using the Russian-made docking module that had been previously installed on the third day of the mission. The astronauts and the Mir 20 cosmonauts, Cmdr. Yuri Gidzenko, Flight Engineer Gergei Avdeyev, and Cosmonaut-Researcher (ESA) Thomas Reiter, are shown greeting each other from inside the docking module and an in-orbit interview between the crews and NASA is conducted in both English and Russian.

  1. STS-74 Flight Day 4

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On this fourth day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hadfield, perform a successful docking between the space shuttle and the Mir space station using the Russian-made docking module that had been previously installed on the third day of the mission. The astronauts and the Mir 20 cosmonauts, Cmdr. Yuri Gidzenko, Flight Engineer Gergei Avdeyev, and Cosmonaut-Researcher (ESA) Thomas Reiter, are shown greeting each other from inside the docking module and an in-orbit interview between the crews and NASA is conducted in both English and Russian.

  2. Orbiter Docking System/Spacelab-Mir Module in Atlantis

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The STS-71 mission payload is in its final flight configuration after integration into the payload bay of the Space Shuttle orbiter Atlantis and prior to payload bay door closing and rollover of the spaceplane from Orbiter Processing Facility Bay 3 to the Vehicle Assembly Building. In the foreground is the Orbiter Docking System (ODS) that is topped with the red Russian- built Androgynous Peripheral Docking System (APDS). During the 11-day mission, the APDS will lock together with a similar system on the Russian Mir Space Station so that the two spacecraft can remain docked together for four days. The ODS features an airlock that will provide access to and from both the Mir and orbiter for the U.S. and Russian flight crews. A Spacelab transfer tunnel runs from the ODS to the Spacelab-Mir module, where joint U.S. medical experiments will be conducted during the 11-day spaceflight.

  3. Project EGRESS: The design of an assured crew return vehicle for the space station

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Keeping preliminary studies by NASA in mind, an Assured Crew Return Vehicle (ACRV) was developed. The system allows the escape of one or more crew members from Space Station Freedom in case of emergency. The design of the vehicle addresses propulsion, orbital operations, reentry, landing and recovery, power and communication, and life support. In light of recent modifications in Space Station design, Project EGRESS (Earthbound Guaranteed ReEntry from Space Station) pays particular attention to its impact on Space Station operations, interfaces and docking facilities, and maintenance needs. A water landing, medium lift vehicle was found to best satisfy project goals of simplicity and cost efficiency without sacrificing the safety and reliability requirements. With a single vehicle, one injured crew member could be returned to Earth with minimal pilot involvement. Since the craft is capable of returning up to five crew members, two such permanently docked vehicles would allow full evacuation of the Space Station. The craft could be constructed entirely with available 1990 technology and launched aboard a shuttle orbiter.

  4. Comparative evaluation of several docking tools for docking small molecule ligands to DC-SIGN.

    PubMed

    Jug, Gregor; Anderluh, Marko; Tomašič, Tihomir

    2015-06-01

    Five docking tools, namely AutoDock, FRED, CDOCKER, FlexX and GOLD, have been critically examined, with the aim of selecting those most appropriate for use as docking tools for docking molecules to the lectin dendritic cell-specific intercellular adhesion molecule-3-grabbing non-integrin (DC-SIGN). This lectin has been selected for its rather non-druggable binding site, which enables complex interactions that guide the binding of the core monosaccharide. Since optimal orientation is crucial for forming coordination bonds, it was important to assess whether the selected docking tools could reproduce the optimal binding conformation for several oligosaccharides that are known to bind DC-SIGN. Our results show that even widely used docking programs have certain limitations when faced with a rather shallow and featureless binding site, as is the case of DC-SIGN. The FRED docking software (OpenEye Scientific Software, Inc.) was found to score as the best tool for docking ligands to DC-SIGN. The performance of FRED was further assessed on another lectin, Langerin. We have demonstrated that this validated docking protocol could be used for docking to other lectins similar to DC-SIGN.

  5. STS-114 orbiter Discovery during docking of Raffaello

    NASA Image and Video Library

    2005-08-05

    ISS011-E-11510 (5 August 2005) --- On the eve of the separation of Discovery and the International Space Station, an Expedition 11 crew member took this digital still picture. Crews onboard the orbital outpost and Discovery were wrapping up nine days of joint operations. The Space Shuttle is partially visible beneath other hardware. The Canadian-built robot arms for both spacecraft are dominant in the frame. A Russian Soyuz is docked to the Station in the foreground. After the Italian-built Multi-Purpose Logistics Module Raffaello was secured in Discovery's cargo bay, Astronauts Charles J. Camarda and Andrew S.W. Thomas, mission specialists operating from Discovery's aft flight deck, used the Shuttle arm to hand off the Orbiter Boom Sensor System to the Station arm. Then Astronauts Wendy B. Lawrence, mission specialist, and James M. Kelly, pilot, onboard Destiny, reberthed the OBSS in its position on the starboard sill of the cargo bay. Undocking is scheduled shortly before 2:30 a.m. (CDT) on August 6.

  6. Exploring the Stability of Ligand Binding Modes to Proteins by Molecular Dynamics Simulations: A Cross-docking Study.

    PubMed

    Liu, Kai; Kokubo, Hironori

    2017-10-23

    Docking has become an indispensable approach in drug discovery research to predict the binding mode of a ligand. One great challenge in docking is to efficiently refine the correct pose from various putative docking poses through scoring functions. We recently examined the stability of self-docking poses under molecular dynamics (MD) simulations and showed that equilibrium MD simulations have some capability to discriminate between correct and decoy poses. Here, we have extended our previous work to cross-docking studies for practical applications. Three target proteins (thrombin, heat shock protein 90-alpha, and cyclin-dependent kinase 2) of pharmaceutical interest were selected. Three comparable poses (one correct pose and two decoys) for each ligand were then selected from the docking poses. To obtain the docking poses for the three target proteins, we used three different protocols, namely: normal docking, induced fit docking (IFD), and IFD against the homology model. Finally, five parallel MD equilibrium runs were performed on each pose for the statistical analysis. The results showed that the correct poses were generally more stable than the decoy poses under MD. The discrimination capability of MD depends on the strategy. The safest way was to judge a pose as being stable if any one run among five parallel runs was stable under MD. In this case, 95% of the correct poses were retained under MD, and about 25-44% of the decoys could be excluded by the simulations for all cases. On the other hand, if we judge a pose as being stable when any two or three runs were stable, with the risk of incorrectly excluding some correct poses, approximately 31-53% or 39-56% of the two decoys could be excluded by MD, respectively. Our results suggest that simple equilibrium simulations can serve as an effective filter to exclude decoy poses that cannot be distinguished by docking scores from the computationally expensive free-energy calculations.

  7. MS Wisoff with duct tape on the middeck

    NASA Image and Video Library

    1997-01-12

    STS081-E-5009 (12 Jan. 1997) --- Astronaut Peter J. K. (Jeff) Wisoff, mission specialist, helps carry out tasks of readying the Space Shuttle Atlantis for almost ten days in space, securing supplies with a piece of gaffer's tape. Currently, Wisoff is accompanied by five crew mates, among whom one - astronaut Jerry M. Linenger - will be exchanged in a few days for John E. Blaha, who has been aboard Russia's Mir Space Station for several months, as a cosmonaut guest researcher. Docking of Atlantis with Mir is scheduled for the middle of the week. The scene was recorded with an Electronic Still Camera (ESC) and later downlinked to flight controllers in Houston, Texas.

  8. STS-79 Flight Day 7

    NASA Technical Reports Server (NTRS)

    1996-01-01

    On this seventh day of the STS-79 mission, the flight crew, Cmdr. William F. Readdy, Pilot Terrence W. Wilcutt, Mission Specialists, Thomas D. Akers, Shannon Lucid, Jay Apt, and Carl E. Walz, share a brief video tour of the Mir Space Station with flight controllers, taking a break from the transfer activities that has occupied the astronauts' time during three days of docked operations. Readdy and Apt floated through several of Mir's modules and back into Atlantis' double Spacehab module during the tour pointing out the numerous transfer items stowed on both spacecraft. Readdy, Wilcutt, Lucid and Blaha are seen discussing their mission in an interview with CNN's John Holliman.

  9. Performance Assessment in the PILOT Experiment On Board Space Stations Mir and ISS.

    PubMed

    Johannes, Bernd; Salnitski, Vyacheslav; Dudukin, Alexander; Shevchenko, Lev; Bronnikov, Sergey

    2016-06-01

    The aim of this investigation into the performance and reliability of Russian cosmonauts in hand-controlled docking of a spacecraft on a space station (experiment PILOT) was to enhance overall mission safety and crew training efficiency. The preliminary findings on the Mir space station suggested that a break in docking training of about 90 d significantly degraded performance. Intensified experiment schedules on the International Space Station (ISS) have allowed for a monthly experiment using an on-board simulator. Therefore, instead of just three training tasks as on Mir, five training flights per session have been implemented on the ISS. This experiment was run in parallel but independently of the operational docking training the cosmonauts receive. First, performance was compared between the experiments on the two space stations by nonparametric testing. Performance differed significantly between space stations preflight, in flight, and postflight. Second, performance was analyzed by modeling the linear mixed effects of all variances (LME). The fixed factors space station, mission phases, training task numbers, and their interaction were analyzed. Cosmonauts were designated as a random factor. All fixed factors were found to be significant and the interaction between stations and mission phase was also significant. In summary, performance on the ISS was shown to be significantly improved, thus enhancing mission safety. Additional approaches to docking performance assessment and prognosis are presented and discussed.

  10. Space Operations Center, Shuttle Interaction Study. Volume 2: Appendices, Book 1 of 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The feasibility of shuttle orbiter docking to the Space Operations Center (SOC) is studied. The in-orbit relative motion of the free flying orbiter and SOC was simulated, accounting for the Orbiter RCS and digital autopilot (DAP) systems, orbital mechanics, center of gravity offset of the orbiter docking port, aero and gravity gradient effects, and other pertinent natural and man-made phenomena. Since there is no specified flight path and procedure for docking, terminal closure sensitivities were investigated. Orbiter approach direction, Orbiter approach attitude out of plane, DAP thruster compensation mode, final ballistic docking distance and time to dock, rate and excursion attitude deadbands, and selection of various thruster combinations (differing from nominal) for translational pulses are considered.

  11. SPACEHAB module at LC-39B for STS-76

    NASA Technical Reports Server (NTRS)

    1996-01-01

    At Launch Pad 39B, the SPACEHAB module has been installed in the payload bay of the Space Shuttle Atlantis, which was rolled out to the pad a day previously. Already located in the payload bay was the Orbiter Docking System (ODS), to which the SPACEHAB was connected via a tunnel. During the upcoming flight of Atlantis on Mission STS-76, the ODS will be docked to the Docking Module located on the Kristall module docking port on the Russian Space Station Mir. The SPACEHAB will be filled with Russian and U.S. logistics equipment for transfer to Mir. Also located in the mini-research laboratory is the European Space Agency's Biorack, which houses experiments to be conducted by the U.S. astronauts during the nine-day flight. Atlantis is scheduled to lift off on the third Shuttle-Mir docking mission on March 21.

  12. Hatch opening

    NASA Image and Video Library

    2005-07-28

    S114-E-5509 (28 July 2005) --- Astronaut Eileen M. Collins, STS-114 commander, has just opened the hatch that will lead her and the entire Discovery crew into the International Space Station. Astronaut Andrew S.W. Thomas, mission specialist, is partially visible at left edge of frame. This was just one highlight of a very busy day that earlier saw the flawless rendezvous and docking operations between the shuttle and the orbital outpost.

  13. International Space Station (ISS)

    NASA Image and Video Library

    2002-10-09

    Back dropped against a blue and white Earth, the Space Shuttle Orbiter Atlantis was photographed by an Expedition 5 crew member onboard the International Space Station (ISS) during rendezvous and docking operations. Docking occurred at 10:17 am on October 9, 2002. The Starboard 1 (S1) Integrated Truss Structure, the primary payload of the STS-112 mission, can be seen in Atlantis' cargo bay. Installed and outfitted within 3 sessions of Extravehicular Activity (EVA) during the 11 day mission, the S1 truss provides structural support for the orbiting research facility's radiator panels, which use ammonia to cool the Station's complex power system. The S1 truss, attached to the S0 (S Zero) truss installed by the previous STS-110 mission, flows 637 pounds of anhydrous ammonia through three heat rejection radiators.

  14. STS-114 Discovery's approach for docking

    NASA Image and Video Library

    2005-07-28

    ISS011-E-11219 (28 July 2005) --- Overall view of the Space Shuttle Discovery as photographed during the survey operations performed by the Expedition 11 crew on the International Space Station during the STS-114 R-Bar Pitch Maneuver on Flight Day 3. Discovery docked to the station at 6:18 a.m. (CDT) on Thursday, July 28, 2005 as the two spacecraft orbited over the southern Pacific Ocean west of the South American coast. Onboard the shuttle were astronauts Eileen M. Collins, STS-114 commander; James M. Kelly, pilot; Andrew S. W. Thomas, Stephen K. Robinson, Wendy B. Lawrence, Charles J. Camarda and Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi, all mission specialists. The Italian-built Raffaello Multi-Purpose Logistics Module (MPLM) is visible in the cargo bay.

  15. STS-76 Payload Cmdr Ronald Sega suits up

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-76 Payload Commander Ronald M. Sega is donning his launch/entry suit in the Operations and Checkout Building with assistance from a suit technician. The third docking between the Russian Space Station Mir and the U.S. Space Shuttle marks the second trip into space for Sega, who recently served a five-month assignment in Russia as operations director for NASA activities there. Once suitup activities are completed the six-member STS-76 flight crew will depart for Launch Pad 39B, where the Space Shuttle Atlantis is undergoing final preparations for liftoff during an approximately seven-minute launch window opening around 3:13 a.m. EST, March 22.

  16. KSC-97pc139

    NASA Image and Video Library

    1997-01-12

    STS-81 Mission Specialist Peter J. K. "Jeff" Wisoff prepares for the fifth ShuttleMir docking as he waits in the Operations and Checkout (O&C) Building for the operation to fit him into his launch/entry suit to be completed. He conducted a spacewalk on his on his first Shuttle mission, STS57 and holds a doctorate degree in applied physics with an emphasis on lasers and semiconductor materials. He and five crew members will shortly depart the O&C and head for Launch Pad 39B, where the Space Shuttle Atlantis will lift off during a 7-minute window that opens at 4:27 a.m. EST, January 12

  17. STS-81 Mission Specialist Peter Wisoff suits up

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-81 Mission Specialist Peter J. K. 'Jeff' Wisoff prepares for the fifth Shuttle- Mir docking as he waits in the Operations and Checkout (O&C) Building for the operation to fit him into his launch/entry suit to be completed. He conducted a spacewalk on his on his first Shuttle mission, STS- 57 and holds a doctorate degree in applied physics with an emphasis on lasers and semiconductor materials. He and five crew members will shortly depart the O&C and head for Launch Pad 39B, where the Space Shuttle Atlantis will lift off during a 7-minute window that opens at 4:27 a.m. EST, January 12.

  18. Kotov in SM during Progress 37P Docking

    NASA Image and Video Library

    2010-05-01

    ISS023-E-031743 (1 May 2010) --- Russian cosmonaut Oleg Kotov, Expedition 23 commander, is pictured at the manual TORU docking system controls in the Zvezda Service Module of the International Space Station just before conducting a manual control docking of the Progress 37 due to a jet failure on the Progress that forced a shutdown of the Kurs automated rendezvous system. Progress 37 docked to the Pirs Docking Compartment at 2:30 p.m. (EDT) on May 1, 2010, after a three-day flight from the Baikonur Cosmodrome in Kazakhstan.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kring, C.T.; Varma, V.K.; Jatko, W.B.

    The US Army and Team Crusader (United Defense, Lockheed Martin Armament Systems, etc.) are developing the next generation howitzer, the Crusader. The development program includes an advanced, self-propelled liquid propellant howitzer and a companion resupply vehicle. The resupply vehicle is intended to rendezvous with the howitzer near the battlefront and replenish ammunition, fuel, and other material. The Army has recommended that Crusader incorporate new and innovative technologies to improve performance and safety. One conceptual design proposes a robotic resupply boom on the resupply vehicle to upload supplies to the howitzer. The resupply boom would normally be retracted inside the resupplymore » vehicle during transit. When the two vehicles are within range of the resupply boom, the boom would be extended to a receiving port on the howitzer. In order to reduce exposure to small arms fire or nuclear, biological, and chemical hazards, the crew would remain inside the resupply vehicle during the resupply operation. The process of extending the boom and linking with the receiving port is called docking. A boom operator would be designated to maneuver the boom into contact with the receiving port using a mechanical joystick. The docking operation depends greatly upon the skill of the boom operator to manipulate the boom into docking position. Computer simulations at the National Aeronautics and Space Administration have shown that computer-assisted or autonomous docking can improve the ability of the operator to dock safely and quickly. This document describes the present status of the Crusader Autonomous Docking System (CADS) implemented at Oak Ridge National laboratory (ORNL). The purpose of the CADS project is to determine the feasibility and performance limitations of vision systems to satisfy the autonomous docking requirements for Crusader and conduct a demonstration under controlled conditions.« less

  20. Analysis and Selection of a Remote Docking Simulation Visual Display System

    NASA Technical Reports Server (NTRS)

    Shields, N., Jr.; Fagg, M. F.

    1984-01-01

    The development of a remote docking simulation visual display system is examined. Video system and operator performance are discussed as well as operator command and control requirements and a design analysis of the reconfigurable work station.

  1. Vittori and Nespoli in ATV2

    NASA Image and Video Library

    2011-05-23

    ISS027-E-036254 (23 May 2011) --- European Space Agency astronauts Paolo Nespoli (left), Expedition 27 flight engineer; and Roberto Vittori, STS-134 mission specialist, are pictured in the European Space Agency's "Johannes Kepler" Automated Transfer Vehicle-2 (ATV-2) currently docked to the International Space Station following an Earth-to-space phone tag-up with Italian President Giorgio Napolitano. Nespoli has been on the station for over five months and is due to return to Earth in less than 24 hours. Vittori is on a 16-day mission of the space shuttle Endeavour, joined by five NASA astronauts. This occasion is the second time two Italian astronauts have been in space together and the first time in the last 15 years.

  2. Vittori and Nespoli in ATV2

    NASA Image and Video Library

    2011-05-23

    ISS027-E-036252 (23 May 2011) --- European Space Agency astronauts Paolo Nespoli (left), Expedition 27 flight engineer; and Roberto Vittori, STS-134 mission specialist, are pictured in the European Space Agency's "Johannes Kepler" Automated Transfer Vehicle-2 (ATV-2) currently docked to the International Space Station following an Earth-to-space phone tag-up with Italian President Giorgio Napolitano. Nespoli has been on the station for over five months and is due to return to Earth in less than 24 hours. Vittori is on a 16-day mission of the space shuttle Endeavour, joined by five NASA astronauts. This occasion is the second time two Italian astronauts have been in space together and the first time in the last 15 years.

  3. Independent signaling by Drosophila insulin receptor for axon guidance and growth.

    PubMed

    Li, Caroline R; Guo, Dongyu; Pick, Leslie

    2013-01-01

    The Drosophila insulin receptor (DInR) regulates a diverse array of biological processes including growth, axon guidance, and sugar homeostasis. Growth regulation by DInR is mediated by Chico, the Drosophila homolog of vertebrate insulin receptor substrate proteins IRS1-4. In contrast, DInR regulation of photoreceptor axon guidance in the developing visual system is mediated by the SH2-SH3 domain adaptor protein Dreadlocks (Dock). In vitro studies by others identified five NPXY motifs, one in the juxtamembrane region and four in the signaling C-terminal tail (C-tail), important for interaction with Chico. Here we used yeast two-hybrid assays to identify regions in the DInR C-tail that interact with Dock. These Dock binding sites were in separate portions of the C-tail from the previously identified Chico binding sites. To test whether these sites are required for growth or axon guidance in whole animals, a panel of DInR proteins, in which the putative Chico and Dock interaction sites had been mutated individually or in combination, were tested for their ability to rescue viability, growth and axon guidance defects of dinr mutant flies. Sites required for viability were identified. Unexpectedly, mutation of both putative Dock binding sites, either individually or in combination, did not lead to defects in photoreceptor axon guidance. Thus, either sites also required for viability are necessary for DInR function in axon guidance and/or there is redundancy built into the DInR/Dock interaction such that Dock is able to interact with multiple regions of DInR. We also found that simultaneous mutation of all five NPXY motifs implicated in Chico interaction drastically decreased growth in both male and female adult flies. These animals resembled chico mutants, supporting the notion that DInR interacts directly with Chico in vivo to control body size. Mutation of these five NPXY motifs did not affect photoreceptor axon guidance, segregating the roles of DInR in the processes of growth and axon guidance.

  4. Proximity Operations and Docking Sensor Development

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.; Brewster, Linda L.; Lee, James E.

    2009-01-01

    The Next Generation Advanced Video Guidance Sensor (NGAVGS) has been under development for the last three years as a long-range proximity operations and docking sensor for use in an Automated Rendezvous and Docking (AR&D) system. The first autonomous rendezvous and docking in the history of the U.S. Space Program was successfully accomplished by Orbital Express, using the Advanced Video Guidance Sensor (AVGS) as the primary docking sensor. That flight proved that the United States now has a mature and flight proven sensor technology for supporting Crew Exploration Vehicles (CEV) and Commercial Orbital Transport Systems (COTS) Automated Rendezvous and Docking (AR&D). NASA video sensors have worked well in the past: the AVGS used on the Demonstration of Autonomous Rendezvous Technology (DART) mission operated successfully in spot mode out to 2 km, and the first generation rendezvous and docking sensor, the Video Guidance Sensor (VGS), was developed and successfully flown on Space Shuttle flights in 1997 and 1998. 12 Parts obsolescence issues prevent the construction of more AVGS units, and the next generation sensor was updated to allow it to support the CEV and COTS programs. The flight proven AR&D sensor has been redesigned to update parts and add additional capabilities for CEV and COTS with the development of the Next Generation AVGS at the Marshall Space Flight Center. The obsolete imager and processor are being replaced with new radiation tolerant parts. In addition, new capabilities include greater sensor range, auto ranging capability, and real-time video output. This paper presents some sensor hardware trades, use of highly integrated laser components, and addresses the needs of future vehicles that may rendezvous and dock with the International Space Station (ISS) and other Constellation vehicles. It also discusses approaches for upgrading AVGS to address parts obsolescence, and concepts for minimizing the sensor footprint, weight, and power requirements. In addition, the testing of the brassboard and proto-type NGAVGS units will be discussed along with the use of the NGAVGS as a proximity operations and docking sensor.

  5. SAMPL4 & DOCK3.7: lessons for automated docking procedures

    NASA Astrophysics Data System (ADS)

    Coleman, Ryan G.; Sterling, Teague; Weiss, Dahlia R.

    2014-03-01

    The SAMPL4 challenges were used to test current automated methods for solvation energy, virtual screening, pose and affinity prediction of the molecular docking pipeline DOCK 3.7. Additionally, first-order models of binding affinity were proposed as milestones for any method predicting binding affinity. Several important discoveries about the molecular docking software were made during the challenge: (1) Solvation energies of ligands were five-fold worse than any other method used in SAMPL4, including methods that were similarly fast, (2) HIV Integrase is a challenging target, but automated docking on the correct allosteric site performed well in terms of virtual screening and pose prediction (compared to other methods) but affinity prediction, as expected, was very poor, (3) Molecular docking grid sizes can be very important, serious errors were discovered with default settings that have been adjusted for all future work. Overall, lessons from SAMPL4 suggest many changes to molecular docking tools, not just DOCK 3.7, that could improve the state of the art. Future difficulties and projects will be discussed.

  6. KSC-97PC855

    NASA Image and Video Library

    1997-05-24

    This unusual view of the underside of the Space Shuttle orbiter Atlantis shortly before landing was taken by a fish-eye camera lens from KSC’s Shuttle Landing Facility. The Vehicle Assembly Building is in the background at left. The Shuttle Training Aircraft can be seen in the distance, at center. Atlantis is wrapping up its nine-day STS-84 mission, which was the sixth docking of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger is returning to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and Jean-Francois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  7. KSC-97PC839

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis touches down on Runway 33 of the KSC Shuttle Landing Facility, bringing to an end the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  8. KSC-97PC843

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis touches down on Runway 33 of the KSC Shuttle Landing Facility, bringing to an end the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  9. KSC-97PC852

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis touches down on Runway 33 of the KSC Shuttle Landing Facility, bringing to an end the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  10. KSC-97PC838

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis touches down on Runway 33 of the KSC Shuttle Landing Facility, bringing to an end the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  11. Manual control aspects of orbital flight

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.

    1990-01-01

    Studies of spacecraft rendezvous and docking operations began in the Gemini program in preparation for the two dockings required to send a crew to the moon and return them safely to Earth. However, the goal of getting to the moon before the end of the decade was of greater concern than mission optimization so little or no time or money was expended in researching human factors implications of operational aspects such as braking gates or control modes. Also, with sixteen operational dockings over a six year period (12 Apollo, 3 Skylab, and 1 ASTP) in the United States space program, economies of scale were not yet available to justify extensive research into decreasing the time or fuel necessary for a successful docking. With an operational space station era approaching in which orbital maneuvering vehicle (OMV), orbital transfer vehicle (OTV), shuttle orbiter, and other traffic will play a major role, a concerted research effort now could help avoid many potential problems later in addition to increasing safety, fuel economy, and productivity. A knowledge of manual control capabilities associated with piloted spaceflight could help save a life if the operational flight envelope can be safely enlarged to include faster dockings that currently envisioned. For example, current and future research is designed to acquire the appropriate information.

  12. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Special approach/docking testcase results

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1993-01-01

    As part of the RICIS project, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Maximum Mission (SMM) satellite simulation. In utilizing these fuzzy learning techniques, we use the Approximate Reasoning based Intelligent Control (ARIC) architecture, and so we use these two terms interchangeably to imply the same. This activity is carried out in the Software Technology Laboratory utilizing the Orbital Operations Simulator (OOS) and programming/testing support from other contractor personnel. This report is the final deliverable D4 in our milestones and project activity. It provides the test results for the special testcase of approach/docking scenario for the shuttle and SMM satellite. Based on our experience and analysis with the attitude and translational controllers, we have modified the basic configuration of the reinforcement learning algorithm in ARIC. The shuttle translational controller and its implementation in ARIC is described in our deliverable D3. In order to simulate the final approach and docking operations, we have set-up this special testcase as described in section 2. The ARIC performance results for these operations are discussed in section 3 and conclusions are provided in section 4 along with the summary for the project.

  13. Apollo Soyuz, mission evaluation report

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The Apollo Soyuz mission was the first manned space flight to be conducted jointly by two nations - the United States and the Union of Soviet Socialist Republics. The primary purpose of the mission was to test systems for rendezvous and docking of manned spacecraft that would be suitable for use as a standard international system, and to demonstrate crew transfer between spacecraft. The secondary purpose was to conduct a program of scientific and applications experimentation. With minor modifications, the Apollo and Soyuz spacecraft were like those flown on previous missions. However, a new module was built specifically for this mission - the docking module. It served as an airlock for crew transfer and as a structural base for the docking mechanism that interfaced with a similar mechanism on the Soyuz orbital module. The postflight evaluation of the performance of the docking system and docking module, as well as the overall performance of the Apollo spacecraft and experiments is presented. In addition, the mission is evaluated from the viewpoints of the flight crew, ground support operations, and biomedical operations. Descriptions of the docking mechanism, docking module, crew equipment and experiment hardware are given.

  14. I-AUV Docking and Panel Intervention at Sea

    PubMed Central

    Palomeras, Narcís; Peñalver, Antonio; Massot-Campos, Miquel; Negre, Pep Lluís; Fernández, José Javier; Ridao, Pere; Sanz, Pedro J.; Oliver-Codina, Gabriel

    2016-01-01

    The use of commercially available autonomous underwater vehicles (AUVs) has increased during the last fifteen years. While they are mainly used for routine survey missions, there is a set of applications that nowadays can be only addressed by manned submersibles or work-class remotely operated vehicles (ROVs) equipped with teleoperated arms: the intervention applications. To allow these heavy vehicles controlled by human operators to perform intervention tasks, underwater structures like observatory facilities, subsea panels or oil-well Christmas trees have been adapted, making them more robust and easier to operate. The TRITON Spanish founded project proposes the use of a light-weight intervention AUV (I-AUV) to carry out intervention applications simplifying the adaptation of these underwater structures and drastically reducing the operational cost. To prove this concept, the Girona 500 I-AUV is used to autonomously dock into an adapted subsea panel and once docked perform an intervention composed of turning a valve and plugging in/unplugging a connector. The techniques used for the autonomous docking and manipulation as well as the design of an adapted subsea panel with a funnel-based docking system are presented in this article together with the results achieved in a water tank and at sea. PMID:27754348

  15. I-AUV Docking and Panel Intervention at Sea.

    PubMed

    Palomeras, Narcís; Peñalver, Antonio; Massot-Campos, Miquel; Negre, Pep Lluís; Fernández, José Javier; Ridao, Pere; Sanz, Pedro J; Oliver-Codina, Gabriel

    2016-10-12

    The use of commercially available autonomous underwater vehicles (AUVs) has increased during the last fifteen years. While they are mainly used for routine survey missions, there is a set of applications that nowadays can be only addressed by manned submersibles or work-class remotely operated vehicles (ROVs) equipped with teleoperated arms: the intervention applications. To allow these heavy vehicles controlled by human operators to perform intervention tasks, underwater structures like observatory facilities, subsea panels or oil-well Christmas trees have been adapted, making them more robust and easier to operate. The TRITON Spanish founded project proposes the use of a light-weight intervention AUV (I-AUV) to carry out intervention applications simplifying the adaptation of these underwater structures and drastically reducing the operational cost. To prove this concept, the Girona 500 I-AUV is used to autonomously dock into an adapted subsea panel and once docked perform an intervention composed of turning a valve and plugging in/unplugging a connector. The techniques used for the autonomous docking and manipulation as well as the design of an adapted subsea panel with a funnel-based docking system are presented in this article together with the results achieved in a water tank and at sea.

  16. Soyuz Spacecraft docked to the Pirs DC during Expedition Five on the ISS

    NASA Image and Video Library

    2002-11-04

    ISS005-E-19567 (4 November 2002) --- A Soyuz spacecraft, which carried the Soyuz 5 taxi crew, is docked to the Pirs docking compartment on the International Space Station (ISS). The new Soyuz TMA-1 vehicle was designed to accommodate larger or smaller crewmembers, and is equipped with upgraded computers, a new cockpit control panel and improved avionics. The blackness of space and Earth’s horizon provide the backdrop for the scene.

  17. Co-Operative Problem-Solving at the Royal Docks Community School

    ERIC Educational Resources Information Center

    Martin, Ruth

    2013-01-01

    This article responds to Henry Tam's article in this issue of FORUM by exploring opportunities for co-operative problem-solving for staff and students of the Royal Docks Community School in the London Borough of Newham. Becoming a co-operative trust helped the school move out of special measures and develop a strategy of participation and…

  18. Analyses of the dynamic docking test system for advanced mission docking system test programs. [Apollo Soyuz Test Project

    NASA Technical Reports Server (NTRS)

    Gates, R. M.; Williams, J. E.

    1974-01-01

    Results are given of analytical studies performed in support of the design, implementation, checkout and use of NASA's dynamic docking test system (DDTS). Included are analyses of simulator components, a list of detailed operational test procedures, a summary of simulator performance, and an analysis and comparison of docking dynamics and loads obtained by test and analysis.

  19. Experimental validation of docking and capture using space robotics testbeds

    NASA Technical Reports Server (NTRS)

    Spofford, John

    1991-01-01

    Docking concepts include capture, berthing, and docking. The definitions of these terms, consistent with AIAA, are as follows: (1) capture (grasping)--the use of a manipulator to make initial contact and attachment between transfer vehicle and a platform; (2) berthing--positioning of a transfer vehicle or payload into platform restraints using a manipulator; and (3) docking--propulsive mechanical connection between vehicle and platform. The combination of the capture and berthing operations is effectively the same as docking; i.e., capture (grasping) + berthing = docking. These concepts are discussed in terms of Martin Marietta's ability to develop validation methods using robotics testbeds.

  20. Kotov practices the manual docking techniques with the TORU

    NASA Image and Video Library

    2013-11-22

    ISS038-E-006656 (22 Nov. 2013) --- Russian cosmonaut Oleg Kotov, Expedition 38 commander, practices manual docking techniques with the TORU, or telerobotically operated rendezvous system, in the Zvezda Service Module of the International Space Station in preparation for the docking of the Progress 53 spacecraft. Kotov, using the Simvol-TS screen and hand controllers, could manually dock the Progress to the station in the event of a failure of the Kurs automated docking system. The Progress 53 craft is scheduled to complete its automated docking to the aft port of Zvezda at 5:28 p.m. (EST) on Nov. 29.

  1. TORU OBT

    NASA Image and Video Library

    2014-07-22

    ISS040-E-070857 (22 July 2014) --- Russian cosmonaut Alexander Skvortsov, Expedition 40 flight engineer, practices manual docking techniques with the TORU, or telerobotically operated rendezvous system, in the Zvezda Service Module of the International Space Station in preparation for the docking of the Progress 56 spacecraft. Skvortsov, using the Simvol-TS screen and hand controllers, could manually dock the Progress to the station in the event of a failure of the Kurs automated docking system. The Progress 56 craft is scheduled to complete its automated docking to the Pirs docking compartment at 11:30 p.m. (EDT) on July 23, 2014.

  2. Tyurin practices the manual docking techniques with the TORU

    NASA Image and Video Library

    2013-11-22

    ISS038-E-006663 (22 Nov. 2013) --- Russian cosmonaut Mikhail Tyurin, Expedition 38 flight engineer, practices manual docking techniques with the TORU, or telerobotically operated rendezvous system, in the Zvezda Service Module of the International Space Station in preparation for the docking of the Progress 53 spacecraft. Tyurin, using the Simvol-TS screen and hand controllers, could manually dock the Progress to the station in the event of a failure of the Kurs automated docking system. The Progress 53 craft is scheduled to complete its automated docking to the aft port of Zvezda at 5:28 p.m. (EST) on Nov. 29.

  3. TORU OBT

    NASA Image and Video Library

    2014-07-22

    ISS040-E-070859 (22 July 2014) --- Russian cosmonaut Alexander Skvortsov, Expedition 40 flight engineer, practices manual docking techniques with the TORU, or telerobotically operated rendezvous system, in the Zvezda Service Module of the International Space Station in preparation for the docking of the Progress 56 spacecraft. Skvortsov, using the Simvol-TS screen and hand controllers, could manually dock the Progress to the station in the event of a failure of the Kurs automated docking system. The Progress 56 craft is scheduled to complete its automated docking to the Pirs docking compartment at 11:30 p.m. (EDT) on July 23, 2014.

  4. International Space Station (ISS)

    NASA Image and Video Library

    2002-06-07

    Pictured here is the forward docking port on the International Space Station's (ISS) Destiny Laboratory as seen by one of the STS-111 crewmembers from the Space Shuttle Orbiter Endeavour just prior to docking. In June 2002, STS-111 provided the Space Station with a new crew, Expedition Five, replacing Expedition Four after remaining a record-setting 196 days in space. Three spacewalks enabled the STS-111 crew to accomplish additional mission objectives: the delivery and installation of a new platform for the ISS robotic arm, the Mobile Base System (MBS) which is an important part of the Station's Mobile Servicing System allowing the robotic arm to travel the length of the Station; the replacement of a wrist roll joint on the Station's robotic arm; and unloading supplies and science experiments form the Leonardo Multi-Purpose Logistics Module, which made its third trip to the orbital outpost. The STS-111 mission, the 14th Shuttle mission to visit the ISS, was launched on June 5, 2002 and landed June 19, 2002.

  5. Combined multi-pharmacophore, molecular docking and molecular dynamic study for discovery of promising MTH1 inhibitors

    NASA Astrophysics Data System (ADS)

    Dai, Duoqian; Zhou, Lu; Zhu, Xiaohong; You, Rong; Zhong, Liangliang

    2017-06-01

    MutT homolog 1 (MTH1), a nudix phosphohydrolase enzyme participates in the process of repairing of DNA damage by hydrolyzing oxidized deoxy-ribonucleoside triphosphate in cancer cells, is regarded as a potential target for anticancer therapy. In order to seek for promising inhibitor of MTH1, structured-based pharmacophore and 3D-QSAR pharmacophore hypotheses combine with the ADMET analysis and Lipinski's rule of five were used for screening the public molecules libraries (Asinex, Ibscreen and Natural). Then molecular docking studies were performed on screened hits via various docking programs (Glide SP, GOLD and Glide XP), five molecules with three scaffolds were picked out as potential inhibitors against MTH1. Eventually, 20 ns molecular dynamics simulation was implemented on the potential inhibitors. The RMSD (Root Mean Square Deviation) values were used to illustrate bind stability between potential molecules and MTH1. Therefore, the five hits may be considered as promising MTH1 inhibitors by all above studies.

  6. STS-111 crew exits the O&C Building before launch

    NASA Technical Reports Server (NTRS)

    2002-01-01

    KENNEDY SPACE CENTER, FLA. - The STS-111 and Expedition 5 crews eagerly exit from the Operations and Checkout Building for launch aboard Space Shuttle Endeavour. It is the second launch attempt in six days. From front to back are Pilot Paul Lockhart and Commander Kenneth Cockrell; astronaut Peggy Whitson; Expedition 5 Commander Valeri Korzun (RSA) and cosmonaut Sergei Treschev (RSA); and Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz. This mission marks the 14th Shuttle flight to the Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. On mission STS-111, astronauts will deliver the Leonardo Multi-Purpose Logistics Module, the Mobile Base System (MBS), and the Expedition Five crew to the Space Station. During the seven days Endeavour will be docked to the Station, three spacewalks will be performed dedicated to installing MBS and the replacement wrist-roll joint on the Station's Canadarm2 robotic arm. Endeavour will also carry the Expedition 5 crew, who will replace Expedition 4 on board the Station. Expedition 4 crew members will return to Earth with the STS-111 crew. Liftoff is scheduled for 5:22 p.m. EDT from Launch Pad 39A.

  7. STS-79 crew watches from aft flight deck during undocking from Mir

    NASA Image and Video Library

    1997-03-26

    STS079-S-097 (16-26 Sept. 1996) --- Left to right, Terrence W. (Terry) Wilcutt, pilot; Shannon W. Lucid, mission specialist; and William F. Readdy, mission commander, are pictured on the space shuttle Atlantis' aft flight deck during undocking operations with Russia's Mir Space Station. Mir had served as both work and home for Lucid for over six months before greeting her American colleagues upon docking of Mir and Atlantis last week. Following her lengthy stay aboard Mir and several days on Atlantis, Lucid went on to spend 188 consecutive days in space before returning to Earth with the STS-79 crew. During the STS-79 mission, the crew used an IMAX camera to document activities aboard the Space Shuttle Atlantis and the various Mir modules. A hand-held version of the 65mm camera system accompanied the STS-79 crew into space in Atlantis' crew cabin. NASA has flown IMAX camera systems on many Shuttle missions, including a special cargo bay camera's coverage of other recent Shuttle-Mir rendezvous and/or docking missions.

  8. ASTP crewmen in Docking Module trainer during training session at JSC

    NASA Technical Reports Server (NTRS)

    1975-01-01

    An interior view of the Docking Module trainer in bldg 35 during Apollo Soyuz Test Project (ASTP) joint crew training at JSC. Astronaut Donald K. Slayton (right) is the docking module pilot of the American ASTP prime crew. The other man is Cosmonaut Valeriy N. Kubasov, engineer on the Soviet ASTP first (prime) crew. The training session simulated activities on the second day in space. The Docking module is designed to link the Apollo and Soyuz spacecraft.

  9. Commercial Fishing Port Development in North Florida. [Escambia, Bay, Gulf, Franklin, Wakulla, Nassau, and Duval Counties

    NASA Technical Reports Server (NTRS)

    Mathis, K. (Principal Investigator); Cato, J. C.; Degner, P. D.; Landrum, P. D.; Prochaska, F. J.

    1978-01-01

    The author has identified the following significant results. Seven major counties were examined: Escambia, Bay, Gulf, Franklin, Wakulla, Nassau, and Duval. Population and economic activity were reviewed, along with commercial fishing and port facilities. Recommendations for five northwest Florida counties were based on interpretation of aerial photographs, satellite imagery, an aerial survey site visit, and published data. Major needs in Pensacola included docking, ice supply, and net and engine repair services. Costs for additional docks, an ice plant, and gear storage were estimated at $3,658,600. Port users in Panama City identified additional docking and gear storage as primary needs, along with gear repair and a marine railway. Estimated costs for dock and gear storage were $2,860,000. Added docking, gear storage, and ice supply, as well as gear electronics and diesel repair were needed in Port St. Joe. Costs were calculated at $1,231,500. Franklin County has three ports (Apalachicola - $1,107,000 for docks and gear storage, Eastpoint - $420,000 for additional docks, and Carrabella - $2,824,100 for docks, gear storage, and ice plant).

  10. Navigation and Alignment Aids Concept of Operations and Supplemental Design Information. Revision A

    NASA Technical Reports Server (NTRS)

    Kelly, Sean M.; Cryan, Scott P.

    2016-01-01

    The IDSS Navigation and Alignment Aids Concept of Operations and Supplemental Design Information document provides supplemental information to the IDSS IDD. The guide provides insight into the navigation and alignment aids design, and how those aids can be utilized by incoming vehicles for proximity operations and docking. The navigation aids are paramount to successful docking.

  11. DOCKTITE-a highly versatile step-by-step workflow for covalent docking and virtual screening in the molecular operating environment.

    PubMed

    Scholz, Christoph; Knorr, Sabine; Hamacher, Kay; Schmidt, Boris

    2015-02-23

    The formation of a covalent bond with the target is essential for a number of successful drugs, yet tools for covalent docking without significant restrictions regarding warhead or receptor classes are rare and limited in use. In this work we present DOCKTITE, a highly versatile workflow for covalent docking in the Molecular Operating Environment (MOE) combining automated warhead screening, nucleophilic side chain attachment, pharmacophore-based docking, and a novel consensus scoring approach. The comprehensive validation study includes pose predictions of 35 protein/ligand complexes which resulted in a mean RMSD of 1.74 Å and a prediction rate of 71.4% with an RMSD below 2 Å, a virtual screening with an area under the curve (AUC) for the receiver operating characteristics (ROC) of 0.81, and a significant correlation between predicted and experimental binding affinities (ρ = 0.806, R(2) = 0.649, p < 0.005).

  12. MS Mastracchio operates the RMS on the flight deck of Atlantis during STS-106

    NASA Image and Video Library

    2000-09-11

    STS106-E-5099 (11 September 2000) --- Astronaut Richard A. Mastracchio, mission specialist, stands near viewing windows, video monitors and the controls for the remote manipulator system (RMS) arm (out of frame at left) on the flight deck of the Earth-orbiting Space Shuttle Atlantis during Flight Day 3 activity. Atlantis was docked with the International Space Station (ISS) when this photo was recorded with an electronic still camera (ESC).

  13. Flight Test Evaluation of an Unmanned Aircraft System Traffic Management (UTM) Concept for Multiple Beyond-Visual-Line-of-Sight (BVLOS) Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Marcus; Jung, Jaewoo; Rios, Joseph; Mercer, Joey; Homola, Jeffrey; Prevot, Thomas; Mulfinger, Daniel; Kopardekar, Parimal

    2017-01-01

    This study evaluates a traffic management concept designed to enable simultaneous operations of multiple small unmanned aircraft systems (UAS) in the national airspace system (NAS). A five-day flight-test activity is described that examined the feasibility of operating multiple UAS beyond visual line of sight (BVLOS) of their respective operators in the same airspace. Over the five-day campaign, three groups of five flight crews operated a total of eleven different aircraft. Each group participated in four flight scenarios involving five simultaneous missions. Each vehicle was operated BVLOS up to 1.5 miles from the pilot in command. Findings and recommendations are presented to support the feasibility and safety of routine BVLOS operations for small UAS.

  14. Flight Test Evaluation of an Unmanned Aircraft System Traffic Management (UTM) Concept for Multiple Beyond-Visual-Line-of-Sight Operations

    NASA Technical Reports Server (NTRS)

    Johnson, Marcus; Jung, Jaewoo; Rios, Joseph; Mercer, Joey; Homola, Jeffrey; Prevot, Thomas; Mulfinger, Daniel; Kopardekar, Parimal

    2017-01-01

    This study evaluates a traffic management concept designed to enable simultaneous operations of multiple small unmanned aircraft systems (UAS) in the national airspace system (NAS). A five-day flight-test activity is described that examined the feasibility of operating multiple UAS beyond visual line of sight (BVLOS) of their respective operators in the same airspace. Over the five-day campaign, three groups of five flight crews operated a total of eleven different aircraft. Each group participated in four flight scenarios involving five simultaneous missions. Each vehicle was operated BVLOS up to 1.5 miles from the pilot in command. Findings and recommendations are presented to support the feasibility and safety of routine BVLOS operations for small UAS.

  15. Engineering principles to assure compatible docking between future spacecraft of USA and USSR

    NASA Technical Reports Server (NTRS)

    Johnson, C. C.

    1975-01-01

    Working jointly the USA and the USSR have selected an androgynous, peripheral type docking mechanism concept. The mechanical principles inherent to the concept, the rationale supporting its selection, and the probable nature of future designs stemming from the concept, are described. Operational situations just prior to docking, impact conditions, energy absorption, and the structural joining of the spacecraft, are specified. Docking procedures for the Apollo-Soyuz missions are discussed.

  16. The Next Generation Advanced Video Guidance Sensor: Flight Heritage and Current Development

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.

    2009-01-01

    The Next Generation Advanced Video Guidance Sensor (NGAVGS) is the latest in a line of sensors that have flown four times in the last 10 years. The NGAVGS has been under development for the last two years as a long-range proximity operations and docking sensor for use in an Automated Rendezvous and Docking (AR&D) system. The first autonomous rendezvous and docking in the history of the U.S. Space Program was successfully accomplished by Orbital Express, using the Advanced Video Guidance Sensor (AVGS) as the primary docking sensor. That flight proved that the United States now has a mature and flight proven sensor technology for supporting Crew Exploration Vehicles (CEV) and Commercial Orbital Transport Systems (COTS) Automated Rendezvous and Docking (AR&D). NASA video sensors have worked well in the past: the AVGS used on the Demonstration of Autonomous Rendezvous Technology (DART) mission operated successfully in "spot mode" out to 2 km, and the first generation rendezvous and docking sensor, the Video Guidance Sensor (VGS), was developed and successfully flown on Space Shuttle flights in 1997 and 1998. This paper presents the flight heritage and results of the sensor technology, some hardware trades for the current sensor, and discusses the needs of future vehicles that may rendezvous and dock with the International Space Station (ISS) and other Constellation vehicles. It also discusses approaches for upgrading AVGS to address parts obsolescence, and concepts for minimizing the sensor footprint, weight, and power requirements. In addition, the testing of the various NGAVGS development units will be discussed along with the use of the NGAVGS as a proximity operations and docking sensor.

  17. Independent signaling by Drosophila insulin receptor for axon guidance and growth

    PubMed Central

    Li, Caroline R.; Guo, Dongyu; Pick, Leslie

    2014-01-01

    The Drosophila insulin receptor (DInR) regulates a diverse array of biological processes including growth, axon guidance, and sugar homeostasis. Growth regulation by DInR is mediated by Chico, the Drosophila homolog of vertebrate insulin receptor substrate proteins IRS1–4. In contrast, DInR regulation of photoreceptor axon guidance in the developing visual system is mediated by the SH2-SH3 domain adaptor protein Dreadlocks (Dock). In vitro studies by others identified five NPXY motifs, one in the juxtamembrane region and four in the signaling C-terminal tail (C-tail), important for interaction with Chico. Here we used yeast two-hybrid assays to identify regions in the DInR C-tail that interact with Dock. These Dock binding sites were in separate portions of the C-tail from the previously identified Chico binding sites. To test whether these sites are required for growth or axon guidance in whole animals, a panel of DInR proteins, in which the putative Chico and Dock interaction sites had been mutated individually or in combination, were tested for their ability to rescue viability, growth and axon guidance defects of dinr mutant flies. Sites required for viability were identified. Unexpectedly, mutation of both putative Dock binding sites, either individually or in combination, did not lead to defects in photoreceptor axon guidance. Thus, either sites also required for viability are necessary for DInR function in axon guidance and/or there is redundancy built into the DInR/Dock interaction such that Dock is able to interact with multiple regions of DInR. We also found that simultaneous mutation of all five NPXY motifs implicated in Chico interaction drastically decreased growth in both male and female adult flies. These animals resembled chico mutants, supporting the notion that DInR interacts directly with Chico in vivo to control body size. Mutation of these five NPXY motifs did not affect photoreceptor axon guidance, segregating the roles of DInR in the processes of growth and axon guidance. PMID:24478707

  18. KSC-97PC841

    NASA Image and Video Library

    1997-05-24

    The orbiter drag chute deploys after Atlantis touches down on Runway 33 of KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  19. KSC-97PC850

    NASA Image and Video Library

    1997-05-24

    The orbiter drag chute deploys after Atlantis touches down on Runway 33 of KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  20. KSC-97PC851

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis rolls out on Runway 33 of KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. The Shuttle Training Aircraft piloted by astronaut Kenneth D. Cockrell, acting deputy chief of the Astronaut Office, is flying above Atlantis. The Vehicle Assembly Building is at left. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  1. KSC-97PC845

    NASA Image and Video Library

    1997-05-24

    The Space Shuttle orbiter Atlantis, with its drag chute deployed, rolls out on Runway 33 of KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. The Shuttle Training Aircraft piloted by astronaut Kenneth D. Cockrell, acting deputy chief of the Astronaut Office, is flying above Atlantis. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  2. KSC-97PC842

    NASA Image and Video Library

    1997-05-24

    The orbiter drag chute deploys after Atlantis touches down on Runway 33 of KSC’s Shuttle Landing Facility at the conclusion of the nine-day STS-84 mission. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and JeanFrancois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  3. Dredging Research Program. Dredge Mooring Study, Recommended Design, Phase 2 Report

    DTIC Science & Technology

    1992-05-01

    describes the amount of dock space and staging area required (250 ft by 300 ft of dock space), crane requirements (a 50- to 60-ton crane ), and time and...including a diver) in 1 week or less (5 days minimum). With the addition of a second crane and second anchor handling vessel, the assembly and installation...describes the amount of dock space and staging area required (250 ft by 300 ft of dock space), crane requirements (a 50- to 60-ton crane ), and time and

  4. KSC-04pd1497

    NASA Image and Video Library

    2004-07-07

    KENNEDY SPACE CENTER, FLA. - The boat with NEEMO-6 personnel ties up at the dock in Key Largo after a training session offshore at NASA’s undersea research station, named Aquarius. At right is Bill Todd, project lead. The NASA Extreme Environment Mission Operations 6 (NEEMO-6) mission involves spacewalk-like diving excursions and field-testing a variety of biomedical equipment designed to help astronauts living aboard the International Space Station. The NEEMO-6 team comprises astronaut John Herrington, mission commander, astronauts Doug Wheelock and Nick Patrick, and biomedical engineer Tara Ruttley. To prepare for their 10-day stay, the team had dive training twice a day at the Life Support Buoy, anchored above Aquarius.

  5. SpaceDock: A Performance Task Platform for Spaceflight Operations

    NASA Technical Reports Server (NTRS)

    Marshburn, Thomas H.; Strangman, Gary E.; Strauss, Monica S.; Sutton, Jeffrey P.

    2003-01-01

    Preliminary evidence during both short- and long-duration spaceflight indicates that perceptual-motor coordination changes occur and persist in-flight. However, there is presently no in-flight method for evaluating astronaut performance on mission-critical tasks such as docking. We present a portable platform we have developed for attempting and evaluating docking, and describe the results of a pilot study wherein flight novices learned the docking task. Methods: A dual-joystick, six degrees of freedom platform-called SpaceDock-was developed to enable portable, adaptable performance testing in a spaceflight operations setting. Upon this platform, a simplified docking task was created, involving a constant rate of approach towards a docking target and requiring the user to correct translation in two dimensions and attitude orientation along one dimension (either pitch or roll). Ten flight naive subjects performed the task over a 45 min period and all joystick inputs and timings were collected, from which we could successfully reconstruct travel paths, input profiles and relative target displacements. Results: Subjects exhibited significant improvements in docking over the course of the experiment. Learning to compensate for roll-alterations was robust, whereas compensation for pitch-alterations was not in evidence in this population and relatively short training period. Conclusion: The SpaceDock platform can provide a novel method for training and testing subjects, on a spaceflight-relevant task, and can be used to examine behavioral learning, strategy use, and has been adapted for use in brain imaging experiments.

  6. Gemini rendezvous docking simulator

    NASA Image and Video Library

    1963-11-04

    Multiple exposure of Gemini rendezvous docking simulator. Francis B. Smith wrote in his paper "Simulators for Manned Space Research," "The rendezvous and docking operation of the Gemini spacecraft with the Agena and of the Apollo Command Module with the Lunar Excursion Module have been the subject of simulator studies for several years. [This figure] illustrates the Gemini-Agena rendezvous docking simulator at Langley. The Gemini spacecraft was supported in a gimbal system by an overhead crane and gantry arrangement which provided 6 degrees of freedom - roll, pitch, yaw, and translation in any direction - all controllable by the astronaut in the spacecraft. Here again the controls fed into a computer which in turn provided an input to the servos driving the spacecraft so that it responded to control motions in a manner which accurately simulated the Gemini spacecraft." A.W. Vogeley further described the simulator in his paper "Discussion of Existing and Planned Simulators For Space Research," "Docking operations are considered to start when the pilot first can discern vehicle target size and aspect and terminate, of course, when soft contact is made. ... This facility enables simulation of the docking operation from a distance of 200 feet to actual contact with the target. A full-scale mock-up of the target vehicle is suspended near one end of the track. ... On [the Agena target] we have mounted the actual Agena docking mechanism and also various types of visual aids. We have been able to devise visual aids which have made it possible to accomplish nighttime docking with as much success as daytime docking." -- Published in Barton C. Hacker and James M. Grimwood, On the Shoulders of Titans: A History of Project Gemini, NASA SP-4203; Francis B. Smith, "Simulators for Manned Space Research," Paper presented at the 1966 IEEE International convention, March 21-25, 1966; A.W. Vogeley, "Discussion of Existing and Planned Simulators For Space Research," Paper presented at the Conference on the Role of Simulation in Space Technology, August 17-21, 1964.

  7. Global Positioning System Synchronized Active Light Autonomous Docking System

    NASA Technical Reports Server (NTRS)

    Howard, Richard T. (Inventor); Book, Michael L. (Inventor); Bryan, Thomas C. (Inventor); Bell, Joseph L. (Inventor)

    1996-01-01

    A Global Positioning System Synchronized Active Light Autonomous Docking System (GPSSALADS) for automatically docking a chase vehicle with a target vehicle comprising at least one active light emitting target which is operatively attached to the target vehicle. The target includes a three-dimensional array of concomitantly flashing lights which flash at a controlled common frequency. The GPSSALADS further comprises a visual tracking sensor operatively attached to the chase vehicle for detecting and tracking the target vehicle. Its performance is synchronized with the flash frequency of the lights by a synchronization means which is comprised of first and second internal clocks operatively connected to the active light target and visual tracking sensor, respectively, for providing timing control signals thereto, respectively. The synchronization means further includes first and second Global Positioning System receivers operatively connected to the first and second internal clocks, respectively, for repeatedly providing simultaneous synchronization pulses to the internal clocks, respectively. In addition, the GPSSALADS includes a docking process controller means which is operatively attached to the chase vehicle and is responsive to the visual tracking sensor for producing commands for the guidance and propulsion system of the chase vehicle.

  8. Global Positioning System Synchronized Active Light Autonomous Docking System

    NASA Technical Reports Server (NTRS)

    Howard, Richard (Inventor)

    1994-01-01

    A Global Positioning System Synchronized Active Light Autonomous Docking System (GPSSALADS) for automatically docking a chase vehicle with a target vehicle comprises at least one active light emitting target which is operatively attached to the target vehicle. The target includes a three-dimensional array of concomitantly flashing lights which flash at a controlled common frequency. The GPSSALADS further comprises a visual tracking sensor operatively attached to the chase vehicle for detecting and tracking the target vehicle. Its performance is synchronized with the flash frequency of the lights by a synchronization means which is comprised of first and second internal clocks operatively connected to the active light target and visual tracking sensor, respectively, for providing timing control signals thereto, respectively. The synchronization means further includes first and second Global Positioning System receivers operatively connected to the first and second internal clocks, respectively, for repeatedly providing simultaneous synchronization pulses to the internal clocks, respectively. In addition, the GPSSALADS includes a docking process controller means which is operatively attached to the chase vehicle and is responsive to the visual tracking sensor for producing commands for the guidance and propulsion system of the chase vehicle.

  9. 9 CFR 355.15 - Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...-breeding material; nuisances. All operating and storage rooms and departments of inspected plants used for... storage rooms; outer premises, docks, driveways, etc.; fly-breeding material; nuisances. 355.15 Section... premises of every inspected plant shall be kept in clean and orderly condition. All catchbasins on the...

  10. 9 CFR 355.15 - Inedible material operating and storage rooms; outer premises, docks, driveways, etc.; fly...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-breeding material; nuisances. All operating and storage rooms and departments of inspected plants used for... storage rooms; outer premises, docks, driveways, etc.; fly-breeding material; nuisances. 355.15 Section... premises of every inspected plant shall be kept in clean and orderly condition. All catchbasins on the...

  11. NASA Docking System (NDS) Interface Definitions Document (IDD). Revision C, Nov. 2010

    NASA Technical Reports Server (NTRS)

    2010-01-01

    The NASA Docking System (NDS) mating system supports low approach velocity docking and provides a modular and reconfigurable standard interface, supporting crewed and autonomous vehicles during mating and assembly operations. The NDS is NASA's implementation for the emerging International Docking System Standard (IDSS) using low impact docking technology. All NDS configurations can mate with the configuration specified in the IDSS Interface Definition Document (IDD) released September 21, 2010. The NDS evolved from the Low Impact Docking System (LIDS). The acronym international Low Impact Docking System (iLIDS) is also used to describe this system. NDS and iLIDS may be used interchangeability. Some of the heritage documentation and implementations (e.g., software command names) used on NDS will continue to use the LIDS acronym. The NDS IDD defines the interface characteristics and performance capability of the NDS, including uses ranging from crewed to autonomous space vehicles and from low earth orbit to deep space exploration. The responsibility for developing space vehicles and for making them technically and operationally compatible with the NDS rests with the vehicle providers. Host vehicle examples include crewed/uncrewed spacecraft, space station modules, elements, etc. Within this document, any docking space vehicle will be referred to as the host vehicle. This document defines the NDS-to-NDS interfaces, as well as the NDS-to-host vehicle interfaces and performance capability.

  12. A Drosophila protein-tyrosine phosphatase associates with an adapter protein required for axonal guidance.

    PubMed

    Clemens, J C; Ursuliak, Z; Clemens, K K; Price, J V; Dixon, J E

    1996-07-19

    We have used the yeast two-hybrid system to isolate a novel Drosophila adapter protein, which interacts with the Drosophila protein-tyrosine phosphatase (PTP) dPTP61F. Absence of this protein in Drosophila causes the mutant photoreceptor axon phenotype dreadlocks (dock) (Garrity, P. A., Rao, Y., Salecker, I., and Zipursky, S. L.(1996) Cell 85, 639-650). Dock is similar to the mammalian oncoprotein Nck and contains three Src homology 3 (SH3) domains and one Src homology 2 (SH2) domain. The interaction of dPTP61F with Dock was confirmed in vivo by immune precipitation experiments. A sequence containing five PXXP motifs from the non-catalytic domain of the PTP is sufficient for interaction with Dock. This suggests that binding to the PTP is mediated by one or more of the SH3 domains of Dock. Immune precipitations of Dock also co-precipitate two tyrosine-phosphorylated proteins having molecular masses of 190 and 145 kDa. Interactions between Dock and these tyrosine-phosphorylated proteins are likely mediated by the Dock SH2 domain. These findings identify potential signal-transducing partners of Dock and propose a role for dPTP61F and the unidentified phosphoproteins in axonal guidance.

  13. Astronaut Russell Schweickart photographed during EVA

    NASA Technical Reports Server (NTRS)

    1969-01-01

    Astronaut Russell L. Schweickart, lunar module pilot, operates a 70mm Hasselblad camera during his extravehicular activity on the fourth day of the Apollo 9 earth-orbital mission. The Command/Service Module and the Lunar Module 3 'Spider' are docked. This view was taken form the Command Module 'Gumdrop'. Schweickart, wearing an Extravehicular Mobility Unit (EMU), is standing in 'golden slippers' on the Lunar Module porch. On his back, partially visible, are a Portable Life Support System (PLSS) and an Oxygen Purge System (OPS).

  14. Olivas uses a laser ranging device on STS-117 Space Shuttle Atlantis

    NASA Image and Video Library

    2007-06-10

    S117-E-06953 (10 June 2007) --- Astronaut John "Danny" Olivas, STS-117 mission specialist, aims a laser range finder through one of the overhead windows on the aft flight deck of the Space Shuttle Atlantis at it approaches the International Space Station. This instrument is a regularly called-on tool during rendezvous operations with the station. The subsequent docking will allow the STS-117 astronauts and the Expedition 15 crew to team up for several days of key tasks in space.

  15. Inflight - Apollo X - MSC

    NASA Image and Video Library

    1969-05-18

    S69-34039 (18 May 1969) --- Overall view of activity in the Mission Operations Control Room in the Mission Control Center, Building 30, on the first day of the Apollo 10 lunar orbit mission. This picture was taken following CSM/LM-S-IVB separation, and prior to LM extraction from the S-IVB. The telecast from the Apollo 10's color TV camera shows the LM still attached to the S-IVB. The CSM is making the docking approach to the LM/S-IVB.

  16. KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and STS-98 Commander Ken Cockrell (right) applaud the unveiling of the name "Destiny" for the U.S. Laboratory module. The lab, which is behnd them on a workstand, is scheduled to be launched on STS-98 on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. The Shuttle will spend six days docked to the Station while the laboratory is attached and three spacewalks are conducted to compete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for Station systems, including high data-rate communications, and maintain the Station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.

    NASA Image and Video Library

    1998-12-01

    KENNEDY SPACE CENTER, FLA. - In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and STS-98 Commander Ken Cockrell (right) applaud the unveiling of the name "Destiny" for the U.S. Laboratory module. The lab, which is behnd them on a workstand, is scheduled to be launched on STS-98 on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. The Shuttle will spend six days docked to the Station while the laboratory is attached and three spacewalks are conducted to compete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for Station systems, including high data-rate communications, and maintain the Station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights.

  17. HDOCK: a web server for protein–protein and protein–DNA/RNA docking based on a hybrid strategy

    PubMed Central

    Yan, Yumeng; Zhang, Di; Zhou, Pei; Li, Botong

    2017-01-01

    Abstract Protein–protein and protein–DNA/RNA interactions play a fundamental role in a variety of biological processes. Determining the complex structures of these interactions is valuable, in which molecular docking has played an important role. To automatically make use of the binding information from the PDB in docking, here we have presented HDOCK, a novel web server of our hybrid docking algorithm of template-based modeling and free docking, in which cases with misleading templates can be rescued by the free docking protocol. The server supports protein–protein and protein–DNA/RNA docking and accepts both sequence and structure inputs for proteins. The docking process is fast and consumes about 10–20 min for a docking run. Tested on the cases with weakly homologous complexes of <30% sequence identity from five docking benchmarks, the HDOCK pipeline tied with template-based modeling on the protein–protein and protein–DNA benchmarks and performed better than template-based modeling on the three protein–RNA benchmarks when the top 10 predictions were considered. The performance of HDOCK became better when more predictions were considered. Combining the results of HDOCK and template-based modeling by ranking first of the template-based model further improved the predictive power of the server. The HDOCK web server is available at http://hdock.phys.hust.edu.cn/. PMID:28521030

  18. Application of molecular docking for the degradation of organic pollutants in the environmental remediation: A review.

    PubMed

    Liu, Zhifeng; Liu, Yujie; Zeng, Guangming; Shao, Binbin; Chen, Ming; Li, Zhigang; Jiang, Yilin; Liu, Yang; Zhang, Yu; Zhong, Hua

    2018-07-01

    The molecular docking has been employed successfully to study the mechanism of biodegradation in the environmental remediation in the past few years, although medical science and biology are the main application areas for it. Molecular docking is a very convenient and low cost method to understand the reaction mechanism of proteins or enzymes with ligands with a high accuracy. This paper mainly provides a review for the application of molecular docking between organic pollutants and enzymes. It summarizes the fundamental knowledge of molecular docking, such as its theory, available softwares and main databases. Moreover, five types of pollutants, including phenols, BTEX (benzene, toluene, ethylbenzene, and xylenes), nitrile, polycyclic aromatic hydrocarbons (PAHs), and high polymer (e.g., lignin and cellulose), are discussed from molecular level. Different removal mechanisms are also explained in detail via docking technology. Even though this method shows promising application in the research of biodegradation, further studies are still needed to relate with actual condition. Copyright © 2018 Elsevier Ltd. All rights reserved.

  19. Improved Evolutionary Hybrids for Flexible Ligand Docking in Autodock

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Belew, R.K.; Hart, W.E.; Morris, G.M.

    1999-01-27

    In this paper we evaluate the design of the hybrid evolutionary algorithms (EAs) that are currently used to perform flexible ligand binding in the Autodock docking software. Hybrid EAs incorporate specialized operators that exploit domain-specific features to accelerate an EA's search. We consider hybrid EAs that use an integrated local search operator to reline individuals within each iteration of the search. We evaluate several factors that impact the efficacy of a hybrid EA, and we propose new hybrid EAs that provide more robust convergence to low-energy docking configurations than the methods currently available in Autodock.

  20. DOVIS 2.0: an efficient and easy to use parallel virtual screening tool based on AutoDock 4.0.

    PubMed

    Jiang, Xiaohui; Kumar, Kamal; Hu, Xin; Wallqvist, Anders; Reifman, Jaques

    2008-09-08

    Small-molecule docking is an important tool in studying receptor-ligand interactions and in identifying potential drug candidates. Previously, we developed a software tool (DOVIS) to perform large-scale virtual screening of small molecules in parallel on Linux clusters, using AutoDock 3.05 as the docking engine. DOVIS enables the seamless screening of millions of compounds on high-performance computing platforms. In this paper, we report significant advances in the software implementation of DOVIS 2.0, including enhanced screening capability, improved file system efficiency, and extended usability. To keep DOVIS up-to-date, we upgraded the software's docking engine to the more accurate AutoDock 4.0 code. We developed a new parallelization scheme to improve runtime efficiency and modified the AutoDock code to reduce excessive file operations during large-scale virtual screening jobs. We also implemented an algorithm to output docked ligands in an industry standard format, sd-file format, which can be easily interfaced with other modeling programs. Finally, we constructed a wrapper-script interface to enable automatic rescoring of docked ligands by arbitrarily selected third-party scoring programs. The significance of the new DOVIS 2.0 software compared with the previous version lies in its improved performance and usability. The new version makes the computation highly efficient by automating load balancing, significantly reducing excessive file operations by more than 95%, providing outputs that conform to industry standard sd-file format, and providing a general wrapper-script interface for rescoring of docked ligands. The new DOVIS 2.0 package is freely available to the public under the GNU General Public License.

  1. Autonomous rendezvous and docking operations of unmanned expendable cargo transfer vehicles (e.g. Centaur) with Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Emmet, Brian R.

    1991-01-01

    This paper describes the results of the feasibility study using Centaur or other CTV's to deliver payloads to the Space Station Freedom (SSF). During this study was examined the requirements upon unmanned cargo transfer stages (including Centaur) for phasing, rendezvous, proximity operations and docking/berthing (capture).

  2. Early Australian experience in robotic sleeve gastrectomy: a single site series.

    PubMed

    Silverman, Candice D; Ghusn, Michael A

    2017-05-01

    The use of robotic platforms in bariatric surgery has recently gained relevance. With an increased use of this technology come concerns regarding learning curve effects during the initial implementation phase. The sleeve gastrectomy though may represent an ideal training procedure for introducing the robot into bariatric surgical practice. The present review of the first 10 consecutive robotic sleeve gastrectomy procedures performed in an Australian bariatric programme by a single surgeon describes the evolution of the technique, learning curve and initial patient outcomes. Between 2014 and 2015, robotic sleeve gastrectomies were performed as primary and revisional procedures by a consistent surgeon-assistant team. Technique evolution and theatre set-up were documented. Patient demographics, operative time (robot docking and total operation time), additional operative procedures performed, operative and post-operative complications at 1, 3 and 6 months post-procedure and weight loss achieved at 6 months were retrospectively reviewed from a prospectively maintained database. Ten robotic sleeve gastrectomies were performed without significant operative complications. One patient was treated as an outpatient with oral antibiotics for a superficial wound infection. The median total operative time was 123 min (interquartile range (IQR) 108.8-142.5), with a median incision to docking time of 19 min (IQR 15.0-31.8). Length of stay in hospital was 2-3 days. Median excess weight loss achieved at 6 months was 50% (IQR 33.9-66.5). This study describes a method of safely introducing the da Vinci robot into bariatric surgical practice. © 2016 Royal Australasian College of Surgeons.

  3. Dynamic Responses of Modular Hybrid Pier to Docking and Drifting Ships

    DTIC Science & Technology

    2011-10-01

    Utilities for ship “ hotel ” services are on the lower, “service” deck. This leaves the operations deck uncluttered for operation of mobile cranes...expand the simulation domain by adding a large outer basin around the core basin as shown in Figure 12 to allow proper propagation of the outbound ...accommodate larger distortions, implying a longer standoff distance once ship docking is completed, hamper cargo transfer and logistic operations

  4. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1992-01-01

    As part of the Research Institute for Computing and Information Systems (RICIS) activity, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Max satellite simulation. This activity is carried out in the software technology laboratory utilizing the Orbital Operations Simulator (OOS). This interim report provides the status of the project and outlines the future plans.

  5. Various candid views of STS-84 crew after hatch opening

    NASA Image and Video Library

    1997-05-17

    STS084-379-034 (15-24 May 1997) --- Two mission commanders greet and shake hands moments after hatch-opening on docking day, of the Space Shuttle Atlantis and Russia's Mir Space Station. Charles J. Precourt (left), STS-84 commander, and Vasili V. Tsibliyev, Mir-23 commander, along with their respective flight crews went on to spend several days sharing joint activities in Earth-orbit. This is the sixth Atlantis/Mir docking mission.

  6. NASA Docking System (NDS) Interface Definitions Document (IDD). Revision F, Dec. 15, 2011

    NASA Technical Reports Server (NTRS)

    Lewis, James

    2011-01-01

    The NASA Docking System (NDS) mating system supports low approach velocity docking and provides a modular and reconfigurable standard interface, supporting crewed and autonomous vehicles during mating and assembly operations. The NDS is NASA s implementation for the International Docking System Standard (IDSS) using low impact docking technology. All NDS configurations can mate with the configuration specified in the IDSS Interface Definition Document (IDD), Revision A, released May 13, 2011. The NDS evolved from the Low Impact Docking System (LIDS). The term (and its associated acronym), international Low Impact Docking System (iLIDS) is also used to describe this system. NDS and iLIDS may be used interchangeability. Some of the heritage documentation and implementations (e.g., software command names) used on the NDS will continue to use the LIDS acronym.

  7. APOLLO SOYUZ TEST PROJECT [ASTP] COSMONAUT PEERS THROUGH ACCESS HATCH TRUSS

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Soviet prime crewman for the Apollo Soyuz Test Project Aleksey Leonov looks through an access hatch at the truss which will hold the Docking Module in the Spacecraft Lunar Adapter for the ASTP mission. The Docking Module will provide access between the Apollo and the Soyuz while they are docked in orbit. Leonov and his crewmen for the joint US/USSR mission spent three days in the KSC area.

  8. The Advanced Video Guidance Sensor: Orbital Express and the Next Generation

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Heaton, Andrew F.; Pinson, Robin M.; Carrington, Connie L.; Lee, James E.; Bryan, Thomas C.; Robertson, Bryan A.; Spencer, Susan H.; Johnson, Jimmie E.

    2008-01-01

    The Orbital Express (OE) mission performed the first autonomous rendezvous and docking in the history of the United States on May 5-6, 2007 with the Advanced Video Guidance Sensor (AVGS) acting as one of the primary docking sensors. Since that event, the OE spacecraft performed four more rendezvous and docking maneuvers, each time using the AVGS as one of the docking sensors. The Marshall Space Flight Center's (MSFC's) AVGS is a nearfield proximity operations sensor that was integrated into the Autonomous Rendezvous and Capture Sensor System (ARCSS) on OE. The ARCSS provided the relative state knowledge to allow the OE spacecraft to rendezvous and dock. The AVGS is a mature sensor technology designed to support Automated Rendezvous and Docking (AR&D) operations. It is a video-based laser-illuminated sensor that can determine the relative position and attitude between itself and its target. Due to parts obsolescence, the AVGS that was flown on OE can no longer be manufactured. MSFC has been working on the next generation of AVGS for application to future Constellation missions. This paper provides an overview of the performance of the AVGS on Orbital Express and discusses the work on the Next Generation AVGS (NGAVGS).

  9. Task-parallel message passing interface implementation of Autodock4 for docking of very large databases of compounds using high-performance super-computers.

    PubMed

    Collignon, Barbara; Schulz, Roland; Smith, Jeremy C; Baudry, Jerome

    2011-04-30

    A message passing interface (MPI)-based implementation (Autodock4.lga.MPI) of the grid-based docking program Autodock4 has been developed to allow simultaneous and independent docking of multiple compounds on up to thousands of central processing units (CPUs) using the Lamarkian genetic algorithm. The MPI version reads a single binary file containing precalculated grids that represent the protein-ligand interactions, i.e., van der Waals, electrostatic, and desolvation potentials, and needs only two input parameter files for the entire docking run. In comparison, the serial version of Autodock4 reads ASCII grid files and requires one parameter file per compound. The modifications performed result in significantly reduced input/output activity compared with the serial version. Autodock4.lga.MPI scales up to 8192 CPUs with a maximal overhead of 16.3%, of which two thirds is due to input/output operations and one third originates from MPI operations. The optimal docking strategy, which minimizes docking CPU time without lowering the quality of the database enrichments, comprises the docking of ligands preordered from the most to the least flexible and the assignment of the number of energy evaluations as a function of the number of rotatable bounds. In 24 h, on 8192 high-performance computing CPUs, the present MPI version would allow docking to a rigid protein of about 300K small flexible compounds or 11 million rigid compounds.

  10. Space station dynamic modeling, disturbance accommodation, and adaptive control

    NASA Technical Reports Server (NTRS)

    Wang, S. J.; Ih, C. H.; Lin, Y. H.; Metter, E.

    1985-01-01

    Dynamic models for two space station configurations were derived. Space shuttle docking disturbances and their effects on the station and solar panels are quantified. It is shown that hard shuttle docking can cause solar panel buckling. Soft docking and berthing can substantially reduce structural loads at the expense of large shuttle and station attitude excursions. It is found predocking shuttle momentum reduction is necessary to achieve safe and routine operations. A direct model reference adaptive control is synthesized and evaluated for the station model parameter errors and plant dynamics truncations. The rigid body and the flexible modes are treated. It is shown that convergence of the adaptive algorithm can be achieved in 100 seconds with reasonable performance even during shuttle hard docking operations in which station mass and inertia are instantaneously changed by more than 100%.

  11. STS-79 Rolls over from OPF to VAB

    NASA Technical Reports Server (NTRS)

    1996-01-01

    A vantage point high atop the Vehicle Assembly Building (VAB) shrinks the size and scale of the orbiter Atlantis as it is rolled from the Orbiter Processing Facility to the VAB. During the five working days it spends inside the huge building, Atlantis will be mated to the external tank/twin solid rocket booster assembly, and then rolled out to Launch Pad 39A. Here, the SPACEHAB Double Module will be installed in the orbiter's payload bay and final launch preparations will get underway. Atlantis is scheduled for liftoff on Mission STS-79 , the fourth docking with the Russian Space Station Mir, scheduled for July 31.

  12. Michoud Recovering From Tornado on This Week @NASA – February 10, 2017

    NASA Image and Video Library

    2017-02-10

    Recovery efforts are underway at NASA’s Michoud Assembly Facility in New Orleans, which was hit by a tornado Feb. 7. In accounting for all 3,500 employees at the facility, officials reported five suffered minor injuries. Buildings, structures and parked cars sustained damage, but there was no reported damage to hardware for NASA’s Space Launch System (SLS) rocket, Orion spacecraft, or the barge Pegasus docked at Michoud. NASA will release updates on the facility’s status as they become available. Also, SpaceX Launch Targeted for Mid-February, SLS Booster Hardware Arrives at KSC, and NASA Aerospace Days!

  13. Integrated Docking Simulation and Testing with the Johnson Space Center Six-Degree of Freedom Dynamic Test System

    NASA Technical Reports Server (NTRS)

    Mitchell, Jennifer D.; Cryan, Scott P.; Baker, Kenneth; Martin, Toby; Goode, Robert; Key, Kevin W.; Manning, Thomas; Chien, Chiun-Hong

    2008-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Constellation Program; this is carried as one of the CEV Project top risks. The Exploration Technology Development Program (ETDP) AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation. One of the project activities is a series of "pathfinder" testing and simulation activities to integrate relative navigation sensors with the Johnson Space Center Six-Degree-of-Freedom Test System (SDTS). The SDTS will be the primary testing location for the Orion spacecraft s Low Impact Docking System (LIDS). Project team members have integrated the Orion simulation with the SDTS computer system so that real-time closed loop testing can be performed with relative navigation sensors and the docking system in the loop during docking and undocking scenarios. Two relative navigation sensors are being used as part of a "pathfinder" activity in order to pave the way for future testing with the actual Orion sensors. This paper describes the test configuration and test results.

  14. STS-112 Flight Day 10 Highlights

    NASA Astrophysics Data System (ADS)

    2002-10-01

    On Flight Day 10 of the STS-112 mission, its crew (Jeffrey Ashby, Commander; Pamela Melroy, Pilot; David Wolf, Mission Specialist; Piers Sellers, Mission Specialist; Sandra Magnus, Mission Specialist; Fyodor Yurchikhin, Mission Specialist) on the Atlantis and the Expedition 5 crew on the International Space Station (ISS) (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) are shown exchanging farewells in the ISS's Destiny Laboratory Module following the completion of a week-long period of docked operations. The Expedition 5 crew is nearing the end of five and a half continuous months aboard the space station. Following the closing of the hatches, the Atlantis Orbiter undocks from the station, and Melroy pilots the shuttle slowly away from the ISS, and engages in a radial fly-around of the station. During the fly-around cameras aboard Atlantis shows ISS from a number of angles. ISS cameras also show Atlantis. There are several shots of each craft with a variety of background settings including the Earth, its limb, and open space. The video concludes with a live interview of Ashby, Melroy and Yurchikhin, still aboard Atlantis, conducted by a reporter on the ground. Questions range from feelings on the conclusion of the mission to the experience of being in space. The primary goal of the mission was the installation of the Integrated Truss Structure S1 on the ISS.

  15. STS-112 Flight Day 10 Highlights

    NASA Technical Reports Server (NTRS)

    2002-01-01

    On Flight Day 10 of the STS-112 mission, its crew (Jeffrey Ashby, Commander; Pamela Melroy, Pilot; David Wolf, Mission Specialist; Piers Sellers, Mission Specialist; Sandra Magnus, Mission Specialist; Fyodor Yurchikhin, Mission Specialist) on the Atlantis and the Expedition 5 crew on the International Space Station (ISS) (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer) are shown exchanging farewells in the ISS's Destiny Laboratory Module following the completion of a week-long period of docked operations. The Expedition 5 crew is nearing the end of five and a half continuous months aboard the space station. Following the closing of the hatches, the Atlantis Orbiter undocks from the station, and Melroy pilots the shuttle slowly away from the ISS, and engages in a radial fly-around of the station. During the fly-around cameras aboard Atlantis shows ISS from a number of angles. ISS cameras also show Atlantis. There are several shots of each craft with a variety of background settings including the Earth, its limb, and open space. The video concludes with a live interview of Ashby, Melroy and Yurchikhin, still aboard Atlantis, conducted by a reporter on the ground. Questions range from feelings on the conclusion of the mission to the experience of being in space. The primary goal of the mission was the installation of the Integrated Truss Structure S1 on the ISS.

  16. [WORK-REST CYCLE OF COSMONAUTS IN MISSIONS 22/23-39/40 OF THE INTERNATIONAL SPACE STATION].

    PubMed

    Stepanova, S I; Karpova, O I; Galichiy, V A; Nesterov, V F; Saraev, I F

    2016-01-01

    Analyzed were the results of in-flight monitoring of the work-rest cycle (WRC) of Russian crewmembers during 17 instances of the International space station crew rotation in the period of 2010-2014. Weakly crew health reports of the MCC-M medical group were reviewed as well as documented overworks, sleep shifts and consequent health complaints as testimonies of WRC intensity level. Hard work schedule characterized 69% of the flight weeks. The contributing factors were extravehicular activities, dock and undock operations with transport vehicles and redock operations with orbital modules, joint work with space shuttle crews, preparations for landing, off-nominal events, cargo transfer, procedures from the Task List and requested by the MCC-M. Facts stated by the analysis give grounds to believe that distribution of equally extra and planned works over days and weeks in 2013-2014 was more uniform as compared with 2010-2012. This seems to somewhat obviate "critical" workload levels on the days of particularly important operations.

  17. ART CONCEPTS - ASTP

    NASA Image and Video Library

    1975-04-01

    S75-27289 (May 1975) --- An artist?s concept depicting the American Apollo spacecraft docked with a Soviet Soyuz spacecraft in Earth orbit. During the joint U.S.-USSR Apollo-Soyuz Test Project mission, scheduled for July 1975, the American and Soviet crews will visit one another?s spacecraft while the Soyuz and Apollo are docked for a maximum period of two days. The mission is designed to test equipment and techniques that will establish international crew rescue capability in space, as well as permit future cooperative scientific missions. Each nation has developed separately docking systems based on a mutually agreeable single set of interface design specifications. The major new U.S. program elements are the docking module and docking system necessary to achieve compatibility of rendezvous and docking systems with the USSR-developed hardware to be used on the Soyuz spacecraft. The DM and docking system together with an Apollo Command/Service Module will be launched by a Saturn 1B launch vehicle. This artwork is by Paul Fjeld.

  18. HDOCK: a web server for protein-protein and protein-DNA/RNA docking based on a hybrid strategy.

    PubMed

    Yan, Yumeng; Zhang, Di; Zhou, Pei; Li, Botong; Huang, Sheng-You

    2017-07-03

    Protein-protein and protein-DNA/RNA interactions play a fundamental role in a variety of biological processes. Determining the complex structures of these interactions is valuable, in which molecular docking has played an important role. To automatically make use of the binding information from the PDB in docking, here we have presented HDOCK, a novel web server of our hybrid docking algorithm of template-based modeling and free docking, in which cases with misleading templates can be rescued by the free docking protocol. The server supports protein-protein and protein-DNA/RNA docking and accepts both sequence and structure inputs for proteins. The docking process is fast and consumes about 10-20 min for a docking run. Tested on the cases with weakly homologous complexes of <30% sequence identity from five docking benchmarks, the HDOCK pipeline tied with template-based modeling on the protein-protein and protein-DNA benchmarks and performed better than template-based modeling on the three protein-RNA benchmarks when the top 10 predictions were considered. The performance of HDOCK became better when more predictions were considered. Combining the results of HDOCK and template-based modeling by ranking first of the template-based model further improved the predictive power of the server. The HDOCK web server is available at http://hdock.phys.hust.edu.cn/. © The Author(s) 2017. Published by Oxford University Press on behalf of Nucleic Acids Research.

  19. KSC-04pd1496

    NASA Image and Video Library

    2004-07-07

    KENNEDY SPACE CENTER, FLA. - A boat returns to the dock in Key Largo from a training session offshore at NASA’s undersea research station, named Aquarius. At left is Marc Reagan, lead on the NASA Extreme Environment Mission Operations 6 (NEEMO-6) mission. In the bow is astronaut John Herrington, mission commander. The others are support personnel. Members of the team also include astronauts Doug Wheelock and Nick Patrick, and biomedical engineer Tara Ruttley. To prepare for their 10-day stay, the team had dive training twice a day. While stationed in Aquarius, the team conducted spacewalk-like diving excursions and field-testing a variety of biomedical equipment designed to help astronauts living aboard the International Space Station.

  20. STS-89 Day 03 Highlights

    NASA Technical Reports Server (NTRS)

    1998-01-01

    On this third day of the STS-89 mission, the flight crew, Cmdr. Terrence W. Wilcutt, Pilot Frank Edwards, and Mission Specialists Michael P. Anderson, James F. Reilly, Bonnie J. Dunbar, Salizhan Shakirovich Sharipov, David A. Wolf and Andrew S.W. Thomas, can be seen performing a flawless docking with the Mir. The linkup occurred while the two spaceships flew over southeastern Russia, west of Kazakhstan. After the docking the two crews open the entry hatch and greet each other.

  1. ASTP crewmen in Docking Module trainer during training session at JSC

    NASA Technical Reports Server (NTRS)

    1975-01-01

    An interior view of the Docking Module trainer in bldg 35 during Apollo Soyuz Test Project (ASTP) joint crew training at JSC. Astronaut Thomas P. Stafford, commander of the American ASTP prime crew, is on the right. The other crewman is Cosmonaut Aleksey A. Leonov, commander of the Soviet ASTP prime crew. The training session simulated activities on the second day in Earth orbit. The Docking Module is designed to link the Apollo and Soyuz spacecraft.

  2. Expedition 31 Soyuz TMA-04M Docking to ISS

    NASA Image and Video Library

    2012-05-17

    The family of Expedition 31 Flight Engineer Joe Acaba applauds as they watch the docking of the Soyuz TMA-04M spacecraft on the TV screen at the Russian Mission Control Center in Korolev, Russia, Thursday, May 17, 2012. The Soyuz docked to the International Space Station with Acaba and fellow crew members, Soyuz Commander Gennady Padalka, and Flight Engineer Sergei Revin two days after they launched from the Baikonur Cosmodrome in Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  3. STS-89 tunnel adapter in OPF bay 1

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The tunnel adapter (left) which will be flown on the STS-89 mission is being installed in the Space Shuttle orbiter Endeavour's payload bay in Orbiter Processing Facility bay 1. To the right is the Orbiter Docking System (ODS), with its distinctive red Russian-built Androgynous Peripheral Docking System (APDS). STS-89 will be the eighth U.S. docking mission with the Russian Mir space station. The nine-day space flight is scheduled for launch in mid-January 1998.

  4. A multipurpose model of Hermes-Columbus docking mechanism

    NASA Technical Reports Server (NTRS)

    Gonzalez-Vallejo, J. J.; Fehse, W.; Tobias, A.

    1992-01-01

    One of the foreseen missions of the HERMES spacevehicle is the servicing to the Columbus Free Flying Laboratory (MTFF). Docking between the two spacecraft is a critical operation in which the Docking Mechanism (DM) has a major role. In order to analyze and assess robustness of initially selected concepts and to identify suitable implementation solutions, through the investigation of main parameters involved in the docking functions, a multipurpose model of DM was developed and tested. This paper describes the main design features as well as the process of calibrating and testing.

  5. NASA Advisory Council Task Force on the Shuttle-Mir Rendezvous and Docking Missions

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The NASA Advisory Council Task Force on the Shuttle-Mir rendezvous and docking convened on May 24 and 25, 1994. Based on the meetings, the Task Force made the following recommendations: at a minimum, the mission commander and payload commander for all subsequent Shuttle-Mir missions should be named at least 18 months in advance of the scheduled launch date; in order to derive early operational experience in advance of the first Mir docking mission, the primary objective of STS-63 should be Mir rendezvous and proximity operations; and if at all possible, the launch date for STS-63 should be moved forward.

  6. Fast and accurate grid representations for atom-based docking with partner flexibility.

    PubMed

    de Vries, Sjoerd J; Zacharias, Martin

    2017-06-30

    Macromolecular docking methods can broadly be divided into geometric and atom-based methods. Geometric methods use fast algorithms that operate on simplified, grid-like molecular representations, while atom-based methods are more realistic and flexible, but far less efficient. Here, a hybrid approach of grid-based and atom-based docking is presented, combining precalculated grid potentials with neighbor lists for fast and accurate calculation of atom-based intermolecular energies and forces. The grid representation is compatible with simultaneous multibody docking and can tolerate considerable protein flexibility. When implemented in our docking method ATTRACT, grid-based docking was found to be ∼35x faster. With the OPLSX forcefield instead of the ATTRACT coarse-grained forcefield, the average speed improvement was >100x. Grid-based representations may allow atom-based docking methods to explore large conformational spaces with many degrees of freedom, such as multiple macromolecules including flexibility. This increases the domain of biological problems to which docking methods can be applied. © 2017 Wiley Periodicals, Inc. © 2017 Wiley Periodicals, Inc.

  7. Engineering principles to assure compatible docking between future spacecraft of USA and USSR

    NASA Technical Reports Server (NTRS)

    Johnson, C. C.

    1973-01-01

    An androgynous peripheral type docking mechanism concept selected by the U.S. and the USSR is described. The rationale supporting the selection of the concept, the mechanical principles inherent to the concept, and the probable nature of future designs stemming from the concept are discussed. Operational situations prior to docking, impact conditions, energy absorption, and structural joining of two spacecraft are examined.

  8. Technical Note: Mobile accelerator guidance using an optical tracker during docking in IOERT procedures.

    PubMed

    Marinetto, Eugenio; Victores, Juan González; García-Sevilla, Mónica; Muñoz, Mercedes; Calvo, Felipe Ángel; Balaguer, Carlos; Desco, Manuel; Pascau, Javier

    2017-10-01

    Intraoperative electron radiation therapy (IOERT) involves the delivery of a high radiation dose during tumor resection in a shorter time than other radiation techniques, thus improving local control of tumors. However, a linear accelerator device is needed to produce the beam safely. Mobile linear accelerators have been designed as dedicated units that can be moved into the operating room and deliver radiation in situ. Correct and safe dose delivery is a key concern when using mobile accelerators. The applicator is commonly fixed to the patient's bed to ensure that the dose is delivered to the prescribed location, and the mobile accelerator is moved to dock the applicator to the radiation beam output (gantry). In a typical clinical set-up, this task is time-consuming because of safety requirements and the limited degree of freedom of the gantry. The objective of this study was to present a navigation solution based on optical tracking for guidance of docking to improve safety and reduce procedure time. We used an optical tracker attached to the mobile linear accelerator to track the prescribed localization of the radiation collimator inside the operating room. Using this information, the integrated navigation system developed computes the movements that the mobile linear accelerator needs to perform to align the applicator and the radiation gantry and warns the physician if docking is unrealizable according to the available degrees of freedom of the mobile linear accelerator. Furthermore, we coded a software application that connects all the necessary functioning elements and provides a user interface for the system calibration and the docking guidance. The system could safeguard against the spatial limitations of the operating room, calculate the optimal arrangement of the accelerator and reduce the docking time in computer simulations and experimental setups. The system could be used to guide docking with any commercial linear accelerator. We believe that the docking navigator we present is a major contribution to IOERT, where docking is critical when attempting to reduce surgical time, ensure patient safety and guarantee that the treatment administered follows the radiation oncologist's prescription. © 2017 American Association of Physicists in Medicine.

  9. iss053e235199

    NASA Image and Video Library

    2017-11-20

    iss053e235199 (Nov. 20, 2017) --- The Progress 68 (68P) cargo craft is pictured docked to the Pirs docking compartment. The 68P arrived at the International Space Station on Oct. 16, 2017, with food, fuel and supplies two days after launching from the Baikonur Cosmodrome in Kazakhstan.

  10. Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

    NASA Technical Reports Server (NTRS)

    Mitchell, J.; Johnston, A.; Howard, R.; Williamson, M.; Brewster, L.; Strack, D.; Cryan, S.

    2007-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, AR&D). The crewed versions may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the CEV requirements. The relatively low technology readiness of relative navigation sensors for AR&D has been carried as one of the CEV Projects top risks. The AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation, and to allow the CEV Project to assess the relative navigation sensors.

  11. Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Williamson, Marlin L.; Johnston, Albert S.; Brewster, Linda L.; Mitchell, Jennifer D.; Cryan, Scott P.; Strack, David; Key, Kevin

    2007-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as Automated Rendezvous and Docking, (AR&D).) The crewed versions of the spacecraft may also perform AR&D, possibly with a different level of automation and/or autonomy, and must also provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the CEV requirements. The relatively low technology readiness of relative navigation sensors for AR&D has been carried as one of the CEV Projects top risks. The AR&D Sensor Technology Project seeks to reduce this risk by increasing technology maturation of selected relative navigation sensor technologies through testing and simulation, and to allow the CEV Project to assess the relative navigation sensors.

  12. Enhancing AUV Operational Capabilities: Hovering, Rendezvous, and Docking

    DTIC Science & Technology

    1997-09-30

    ton on the dock that plunges into the bottom of the puck. A rubber sheath insulates the end of the button from the seawater and the exposed current...AUV Navigation and Self -Motion in Shallow Water, ONR. Autonomous Oceanographic Sampling Network Development, ONR. Enhancing AUV Operational...and Failure Recovery, ONR. Dependable Network Topologies with Network Fragment Healing for Component Level Intelli- gent Distributed Control Systems for

  13. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.

    2010-01-01

    Crewed space vehicles have a common requirement to remove the carbon dioxide (CO2) created by the metabolic processes of the crew. The space shuttle [Space Transportation System (STS)] and International Space Station (ISS) each have systems in place that allow control and removal of CO2 from the habitable cabin environment. During periods in which the space shuttle is docked to the ISS, known as "joint docked operations," the space shuttle and ISS share a common atmosphere environment. During this period, an elevated amount of CO2 is produced through the combined metabolic activity of the STS and ISS crews. This elevated CO2 production, together with the large effective atmosphere created by collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe individual CO2 control plans implemented by STS and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. The paper will also discuss some of the issues and anomalies experienced by both engineering teams.

  14. Overview of Carbon Dioxide Control Issues During International Space Station/Space Shuttle Joint Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.; Hayley, Elizabeth P.

    2009-01-01

    Manned space vehicles have a common requirement to remove the Carbon Dioxide (CO2) created by the metabolic processes of the crew. The Space Shuttle and International Space Station (ISS) each have systems in place to allow control and removal of CO2 from the habitable cabin environment. During periods where the Space Shuttle is docked to ISS, known as joint docked operations, the Space Shuttle and ISS share a common atmosphere environment. During this period there is an elevated production of CO2 caused by the combined metabolic activity of the Space Shuttle and ISS crew. This elevated CO2 production, combined with the large effective atmosphere created by the collective volumes of the docked vehicles, creates a unique set of requirements for CO2 removal. This paper will describe the individual CO2 control plans implemented by the Space Shuttle and ISS engineering teams, as well as the integrated plans used when both vehicles are docked. In addition, the paper will discuss some of the issues and anomalies experienced by both engineering teams.

  15. Autonomous docking ground demonstration

    NASA Technical Reports Server (NTRS)

    Lamkin, Steve L.; Le, Thomas Quan; Othon, L. T.; Prather, Joseph L.; Eick, Richard E.; Baxter, Jim M.; Boyd, M. G.; Clark, Fred D.; Spehar, Peter T.; Teters, Rebecca T.

    1991-01-01

    The Autonomous Docking Ground Demonstration is an evaluation of the laser sensor system to support the docking phase (12 ft to contact) when operated in conjunction with the guidance, navigation, and control (GN&C) software. The docking mechanism being used was developed for the Apollo/Soyuz Test Program. This demonstration will be conducted using the 6-DOF Dynamic Test System (DTS). The DTS simulates the Space Station Freedom as the stationary or target vehicle and the Orbiter as the active or chase vehicle. For this demonstration, the laser sensor will be mounted on the target vehicle and the retroflectors will be on the chase vehicle. This arrangement was chosen to prevent potential damage to the laser. The laser sensor system, GN&C, and 6-DOF DTS will be operated closed-loop. Initial conditions to simulate vehicle misalignments, translational and rotational, will be introduced within the constraints of the systems involved.

  16. Ligand Shaping in Induced Fit Docking of MraY Inhibitors. Polynomial Discriminant and Laplacian Operator as Biological Activity Descriptors.

    PubMed

    Lungu, Claudiu N; Diudea, Mircea V; Putz, Mihai V

    2017-06-27

    Docking-i.e., interaction of a small molecule (ligand) with a proteic structure (receptor)-represents the ground of drug action mechanism of the vast majority of bioactive chemicals. Ligand and receptor accommodate their geometry and energy, within this interaction, in the benefit of receptor-ligand complex. In an induced fit docking, the structure of ligand is most susceptible to changes in topology and energy, comparative to the receptor. These changes can be described by manifold hypersurfaces, in terms of polynomial discriminant and Laplacian operator. Such topological surfaces were represented for each MraY (phospho-MurNAc-pentapeptide translocase) inhibitor, studied before and after docking with MraY. Binding affinities of all ligands were calculated by this procedure. For each ligand, Laplacian and polynomial discriminant were correlated with the ligand minimum inhibitory concentration (MIC) retrieved from literature. It was observed that MIC is correlated with Laplacian and polynomial discriminant.

  17. One Year Old and Growing: A Status Report on the International Space Station and Its Partners

    NASA Technical Reports Server (NTRS)

    Bartoe, John-David F.; Hall, Elizabeth

    1999-01-01

    The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

  18. Expedition 31 Soyuz TMA-04M Docking to ISS

    NASA Image and Video Library

    2012-05-17

    View from the balcony of the Russian Mission Control Center shows the Expedition 31 crew portrait along with a timeline of Soyuz TMA-04M docking events on Thursday, May 17, 2012, in Korolev, Russia. The Soyuz docked to the International Space Station at 8:36 a.m. Moscow time with Expedition 31 Soyuz Commander Gennady Padalka, Flight Engineer Sergei Revin, and NASA Flight Engineer Joe Acaba two days after they launched from the Baikonur Cosmodrome in Kazakhstan. Photo Credit (NASA/Bill Ingalls)

  19. Apollo Soyuz test project, USA-USSR. [mission plan of spacecraft docking

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The mission plan of the docking of a United States Apollo and a Soviet Union Soyuz spacecraft in Earth orbit to test compatible rendezvous and docking equipment and procedures is presented. Space experiments conducted jointly by the astronauts and cosmonauts during the joint phase of the mission as well as experiments performed solely by the U.S. astronauts and spread over the nine day span of the flight are included. Biographies of the astronauts and cosmonauts are given.

  20. In-Silico molecular docking and simulation studies on novel chalcone and flavone hybrid derivatives with 1, 2, 3-triazole linkage as vital inhibitors of Plasmodium falciparum dihydroorotate dehydrogenase.

    PubMed

    Thillainayagam, Mahalakshmi; Malathi, Kullappan; Ramaiah, Sudha

    2017-11-27

    The structural motifs of chalcones, flavones, and triazoles with varied substitutions have been studied for the antimalarial activity. In this study, 25 novel derivatives of chalcone and flavone hybrid derivatives with 1, 2, 3-triazole linkage are docked with Plasmodium falciparum dihydroorotate dehydrogenase to establish their inhibitory activity against Plasmodium falciparum. The best binding conformation of the ligands at the catalytic site of dihydroorotate dehydrogenase are selected to characterize the best bound ligand using the best consensus score and the number of hydrogen bond interactions. The ligand namely (2E)-3-(4-{[1-(3-chloro-4-fluorophenyl)-1H-1, 2, 3-triazol-4-yl]methoxy}-3-methoxyphenyl-1-(2-hydroxy-4,6-dimethoxyphenyl)prop-2-en-1-one, is one the among the five best docked ligands, which interacts with the protein through nine hydrogen bonds and with a consensus score of five. To refine and confirm the docking study results, the stability of complexes is verified using Molecular Dynamics Simulations, Molecular Mechanics /Poisson-Boltzmann Surface Area free binding energy analysis, and per residue contribution for the binding energy. The study implies that the best docked Plasmodium falciparum dihydroorotate dehydrogenase-ligand complex is having high negative binding energy, most stable, compact, and rigid with nine hydrogen bonds. The study provides insight for the optimization of chalcone and flavone hybrids with 1, 2, 3-triazole linkage as potent inhibitors.

  1. An overview of autonomous rendezvous and docking system technology development at General Dynamics

    NASA Technical Reports Server (NTRS)

    Kuenzel, Fred

    1991-01-01

    The Centaur avionics suite is undergoing a dramatic modernization for the commercial, DoD Atlas and Titan programs. The system has been upgraded to the current state-of-the-art in ring laser gyro inertial sensors and Mil-Std-1750A processor technology. The Cruise Missile avionic system has similarly been evolving for many years. Integration of GPS into both systems has been underway for over five years with a follow-on cruise missile system currently in flight test. Rendezvous and Docking related studies have been conducted for over five years in support of OMV, CTV, and Advanced Upper Stages, as well as several other internal IR&D's. The avionics system and AR&D simulator demonstrated to the SATWG in November 1990 has been upgraded considerably under two IR&D programs in 1991. The Centaur modern avionics system is being flown in block upgrades which started in July of 1990. The Inertial Navigation Unit will fly in November of 1991. The Cruise Missile avionics systems have been fully tested and operationally validated in combat. The integrated AR&D system for space vehicle applications has been under development and testing since 1990. A Joint NASA / GD ARD&L System Test Program is currently being planned to validate several aspects of system performance in three different NASA test facilities in 1992.

  2. Coding and quantification of a facial expression for pain in lambs.

    PubMed

    Guesgen, M J; Beausoleil, N J; Leach, M; Minot, E O; Stewart, M; Stafford, K J

    2016-11-01

    Facial expressions are routinely used to assess pain in humans, particularly those who are non-verbal. Recently, there has been an interest in developing coding systems for facial grimacing in non-human animals, such as rodents, rabbits, horses and sheep. The aims of this preliminary study were to: 1. Qualitatively identify facial feature changes in lambs experiencing pain as a result of tail-docking and compile these changes to create a Lamb Grimace Scale (LGS); 2. Determine whether human observers can use the LGS to differentiate tail-docked lambs from control lambs and differentiate lambs before and after docking; 3. Determine whether changes in facial action units of the LGS can be objectively quantified in lambs before and after docking; 4. Evaluate effects of restraint of lambs on observers' perceptions of pain using the LGS and on quantitative measures of facial action units. By comparing images of lambs before (no pain) and after (pain) tail-docking, the LGS was devised in consultation with scientists experienced in assessing facial expression in other species. The LGS consists of five facial action units: Orbital Tightening, Mouth Features, Nose Features, Cheek Flattening and Ear Posture. The aims of the study were addressed in two experiments. In Experiment I, still images of the faces of restrained lambs were taken from video footage before and after tail-docking (n=4) or sham tail-docking (n=3). These images were scored by a group of five naïve human observers using the LGS. Because lambs were restrained for the duration of the experiment, Ear Posture was not scored. The scores for the images were averaged to provide one value per feature per period and then scores for the four LGS action units were averaged to give one LGS score per lamb per period. In Experiment II, still images of the faces nine lambs were taken before and after tail-docking. Stills were taken when lambs were restrained and unrestrained in each period. A different group of five human observers scored the images from Experiment II. Changes in facial action units were also quantified objectively by a researcher using image measurement software. In both experiments LGS scores were analyzed using a linear MIXED model to evaluate the effects of tail docking on observers' perception of facial expression changes. Kendall's Index of Concordance was used to measure reliability among observers. In Experiment I, human observers were able to use the LGS to differentiate docked lambs from control lambs. LGS scores significantly increased from before to after treatment in docked lambs but not control lambs. In Experiment II there was a significant increase in LGS scores after docking. This was coupled with changes in other validated indicators of pain after docking in the form of pain-related behaviour. Only two components, Mouth Features and Orbital Tightening, showed significant quantitative changes after docking. The direction of these changes agree with the description of these facial action units in the LGS. Restraint affected people's perceptions of pain as well as quantitative measures of LGS components. Freely moving lambs were scored lower using the LGS over both periods and had a significantly smaller eye aperture and smaller nose and ear angles than when they were held. Agreement among observers for LGS scores were fair overall (Experiment I: W=0.60; Experiment II: W=0.66). This preliminary study demonstrates changes in lamb facial expression associated with pain. The results of these experiments should be interpreted with caution due to low lamb numbers. Copyright © 2016 Elsevier B.V. All rights reserved.

  3. Expedition 28 Docking

    NASA Image and Video Library

    2011-06-10

    William Gerstenmaier, Associate Administrator for Space Operations, is interviewed by Russian Federal Space Agency (ROSCOSMOS) TV following a Soyuz post-docking press conference at the Russian Mission Control Center in Korolev, Russia on Friday, June 10, 2011. The Soyuz TMA-02M docked to the International Space Station carrying Expedition 28 Soyuz Commander Sergei Volkov, NASA Flight Engineer Mike Fossum and JAXA (Japanase Aerospace Exploration Agency) Flight Engineer Satoshi Furukawa. Photo Credit: (NASA/Carla Cioffi)

  4. AGOR 28

    DTIC Science & Technology

    2015-11-20

    unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 2 Exhaust Baffles • December Dry ...Docking Canceled – The floating dry dock is not certified so the docking has been canceled. Divers should do hull and prop cleaning prior to builders...operating temperature of 125-degrees F. A cooler may be necessary to correct this issue. • Uncontaminated Sea Chest – Reports from Armstrong indicate

  5. A primer on wood as dock construction material

    Treesearch

    Stan Lebow

    2007-01-01

    To be a successful marina owner and operator, it’s important to understand all the facets of one’s facility, including the intricacies of one part of the marina that most boaters take for granted: the docks. When it comes to dock construction, marinas have a wide-range of materials to choose from, with one of the most commonly used materials being preservative-treated...

  6. Berthing simulator for space station and orbiter

    NASA Technical Reports Server (NTRS)

    Veerasamy, Sam

    1991-01-01

    The development of a real-time man-in-the-loop berthing simulator is in progress at NASA Lyndon B. Johnson Space Center (JSC) to conduct a parametric study and to measure forces during contact conditions of the actual docking mechanisms for the Space Station Freedom and the orbiter. In berthing, the docking ports of the Space Station and the orbiter are brought together using the orbiter robotic arm to control the relative motion of the vehicles. The berthing simulator consists of a dynamics docking test system (DDTS), computer system, simulator software, and workstations. In the DDTS, the Space Station, and the orbiter docking mechanisms are mounted on a six-degree-of-freedom (6 DOF) table and a fixed platform above the table. Six load cells are used on the fixed platform to measure forces during contact conditions of the docking mechanisms. Two Encore Concept 32/9780 computers are used to simulate the orbiter robotic arm and to operate the berthing simulator. A systematic procedure for a real-time dynamic initialization is being developed to synchronize the Space Station docking port trajectory with the 6 DOF table movement. The berthing test can be conducted manually or automatically and can be extended for any two orbiting vehicles using a simulated robotic arm. The real-time operation of the berthing simulator is briefly described.

  7. KSC-98pc1755

    NASA Image and Video Library

    1998-12-01

    KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, STS-98 crew members Pilot Mark Polansky, Mission Specialist Marsha Ivins and Commander Ken Cockrell pose underneath the banner revealing the name Destiny given to the U.S. Lab module. They are part of the five-member crew scheduled to carry the lab into space aboard Space Shuttle Endeavour early in the year 2000 where it will become the centerpiece of scientific research on the International Space Station. The Shuttle will spend six days docked to the station while the laboratory is attached and three space walks are conducted to complete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for station systems, including high data-rate communications, and maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights

  8. Advanced Video Guidance Sensor and next-generation autonomous docking sensors

    NASA Astrophysics Data System (ADS)

    Granade, Stephen R.

    2004-09-01

    In recent decades, NASA's interest in spacecraft rendezvous and proximity operations has grown. Additional instrumentation is needed to improve manned docking operations' safety, as well as to enable telerobotic operation of spacecraft or completely autonomous rendezvous and docking. To address this need, Advanced Optical Systems, Inc., Orbital Sciences Corporation, and Marshall Space Flight Center have developed the Advanced Video Guidance Sensor (AVGS) under the auspices of the Demonstration of Autonomous Rendezvous Technology (DART) program. Given a cooperative target comprising several retro-reflectors, AVGS provides six-degree-of-freedom information at ranges of up to 300 meters for the DART target. It does so by imaging the target, then performing pattern recognition on the resulting image. Longer range operation is possible through different target geometries. Now that AVGS is being readied for its test flight in 2004, the question is: what next? Modifications can be made to AVGS, including different pattern recognition algorithms and changes to the retro-reflector targets, to make it more robust and accurate. AVGS could be coupled with other space-qualified sensors, such as a laser range-and-bearing finder, that would operate at longer ranges. Different target configurations, including the use of active targets, could result in significant miniaturization over the current AVGS package. We will discuss these and other possibilities for a next-generation docking sensor or sensor suite that involve AVGS.

  9. Advanced Video Guidance Sensor and Next Generation Autonomous Docking Sensors

    NASA Technical Reports Server (NTRS)

    Granade, Stephen R.

    2004-01-01

    In recent decades, NASA's interest in spacecraft rendezvous and proximity operations has grown. Additional instrumentation is needed to improve manned docking operations' safety, as well as to enable telerobotic operation of spacecraft or completely autonomous rendezvous and docking. To address this need, Advanced Optical Systems, Inc., Orbital Sciences Corporation, and Marshall Space Flight Center have developed the Advanced Video Guidance Sensor (AVGS) under the auspices of the Demonstration of Autonomous Rendezvous Technology (DART) program. Given a cooperative target comprising several retro-reflectors, AVGS provides six-degree-of-freedom information at ranges of up to 300 meters for the DART target. It does so by imaging the target, then performing pattern recognition on the resulting image. Longer range operation is possible through different target geometries. Now that AVGS is being readied for its test flight in 2004, the question is: what next? Modifications can be made to AVGS, including different pattern recognition algorithms and changes to the retro-reflector targets, to make it more robust and accurate. AVGS could be coupled with other space-qualified sensors, such as a laser range-and-bearing finder, that would operate at longer ranges. Different target configurations, including the use of active targets, could result in significant miniaturization over the current AVGS package. We will discuss these and other possibilities for a next-generation docking sensor or sensor suite that involve AVGS.

  10. Logistics and operations implications of manual control of spacecraft docking maneuvers

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.; Ellis, Stephen R.

    1991-01-01

    The implications of logistics and operations on the manual control of spacecraft docking are discussed. The results of simulation studies to investigate fuel and time cost tradeoffs are reviewed and discussed. Comparisons of acceleration control and pulse control are presented to evaluate the effects of astronauts being instructed to use pulse mode for fuel conservation. The applications of the findings to moon and Mars missions are addressed.

  11. STS-74 clears tower (with view of RSS)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The STS-74 astronauts depart the Operations and Checkout Building, headed for the launch pad and a rendezvous in space. Leading the way are Commander Kenneth D. Cameron (front right) and Pilot James D. Halsell Jr. (front left). Behind them are the three mission specialists assigned to STS-74 (front to back): Chris A. Hadfield, representing the Canadian Space Agency; Jerry L. Ross, and William S. 'Bill' McArthur Jr. Awaiting them at Launch Pad 39A is the Space Shuttle Atlantis, scheduled for a second liftoff attempt lift off during a seven-minute launch window opening at about 7:30 a.m. EST, Nov. 12. During its approximately eight-day flight, Atlantis will dock with the Russian Space Station Mir and a permanent docking extension will be attached to the station, and transfer of materials to and from the mated spacecraft will be completed. A first launch attempt Nov. 11 was scrubbed due to unfavorable weather conditions at the contingency Transoceanic Abort Landing (TAL) sites.

  12. Protein-protein docking on hardware accelerators: comparison of GPU and MIC architectures

    PubMed Central

    2015-01-01

    Background The hardware accelerators will provide solutions to computationally complex problems in bioinformatics fields. However, the effect of acceleration depends on the nature of the application, thus selection of an appropriate accelerator requires some consideration. Results In the present study, we compared the effects of acceleration using graphics processing unit (GPU) and many integrated core (MIC) on the speed of fast Fourier transform (FFT)-based protein-protein docking calculation. The GPU implementation performed the protein-protein docking calculations approximately five times faster than the MIC offload mode implementation. The MIC native mode implementation has the advantage in the implementation costs. However, the performance was worse with larger protein pairs because of memory limitations. Conclusion The results suggest that GPU is more suitable than MIC for accelerating FFT-based protein-protein docking applications. PMID:25707855

  13. STS-74 flight day 2

    NASA Astrophysics Data System (ADS)

    1995-11-01

    On the second day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hatfield, were awakened to music from the play 'The Nutcracker'. The astronauts hosted an in-orbit interview with Canadian reporters and journalists from Toronto, answering general questions about living in space and space flight, and explaining the delicate maneuvers that the shuttle will have to perform for the Mir docking procedures scheduled for the next day. Due to the awkward angle that the shuttle will use to approach the Mir, the docking procedure will be done in an almost blind state.

  14. STS-101: CAR / Flight Day 03 Highlights

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The primary mission objective for STS-101 was to deliver supplies to the International Space Station, perform a space walk, and reboost the station from 230 statute miles to 250 statute miles. The commander of this mission was, James D. Haslsell. The crew was Scott J. Horowitz, the pilot, and mission specialists Mary Ellen Weber, Jeffrey N. Williams, James S. Voss, Susan J. Helms, and Yuri Vladimirovich Usachev. This videotape shows the activities of the third day of the flight. On this day the shuttle rendezvoused and docked with the station. The videotape shows the rendezvous and the docking maneuver, and some of the crew activities in the shuttle.

  15. STS-74 Flight Day 2

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On the second day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hadfield, were awakened to music from the play 'The Nutcracker'. The astronauts hosted an in-orbit interview with Canadian reporters and journalists from Toronto, answering general questions about living in space and space flight, and explaining the delicate maneuvers that the shuttle will have to perform for the Mir docking procedures scheduled for the next day. Due to the awkward angle that the shuttle will use to approach the Mir, the docking procedure will be done in an almost blind state.

  16. Comparison of neural histomorphology in tail tips from pigs docked using clippers or cautery iron.

    PubMed

    Kells, N J; Beausoleil, N J; Johnson, C B; Sutherland, M A; Morrison, R S; Roe, W

    2017-07-01

    Tail docking of pigs is commonly performed to reduce the incidence of unwanted tail-biting behaviour. Two docking methods are commonly used: blunt trauma cutting (i.e. using side clippers), or cutting and concurrent cauterisation using a hot cautery iron. A potential consequence of tail amputation is the development of neuromas at the docking site. Neuromas have been linked to neuropathic pain, which can influence the longer-term welfare of affected individuals. To determine whether method of tail docking influences the extent of neuroma formation, 75 pigs were allocated to one of three treatments at birth: tail docked using clippers; tail docked using cautery iron; tail left intact. Tail docking was performed at 2 days of age and pigs were kept under conventional conditions until slaughter at 21 weeks of age. Tails were removed following slaughter and subjected to histological examination. Nerve histomorphology was scored according to the following scale: 1=discrete well-organised nerve bundles; 2=moderate neural proliferation and disorganisation affecting more than half of the circumference of the tail; 3=marked neural proliferation to form almost continuous disorganised bundles or non-continuous enlarged bundles compressing the surrounding connective tissue. Scores of 2 or 3 indicated neuroma formation. Scores were higher in docked pigs than undocked pigs (P<0.001), but did not differ between pigs docked using clippers and those docked using cautery (P=0.23). The results indicate that tail docking using either clippers or cautery results in neuroma formation, thus having the potential to affect long-term pig welfare.

  17. Enabling Exploration Through Docking Standards

    NASA Technical Reports Server (NTRS)

    Hatfield, Caris A.

    2012-01-01

    Human exploration missions beyond low earth orbit will likely require international cooperation in order to leverage limited resources. International standards can help enable cooperative missions by providing well understood, predefined interfaces allowing compatibility between unique spacecraft and systems. The International Space Station (ISS) partnership has developed a publicly available International Docking System Standard (IDSS) that provides a solution to one of these key interfaces by defining a common docking interface. The docking interface provides a way for even dissimilar spacecraft to dock for exchange of crew and cargo, as well as enabling the assembly of large space systems. This paper provides an overview of the key attributes of the IDSS, an overview of the NASA Docking System (NDS), and the plans for updating the ISS with IDSS compatible interfaces. The NDS provides a state of the art, low impact docking system that will initially be made available to commercial crew and cargo providers. The ISS will be used to demonstrate the operational utility of the IDSS interface as a foundational technology for cooperative exploration.

  18. Remote operation of an orbital maneuvering vehicle in simulated docking maneuvers

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.

    1990-01-01

    Simulated docking maneuvers were performed to assess the effect of initial velocity on docking failure rate, mission duration, and delta v (fuel consumption). Subjects performed simulated docking maneuvers of an orbital maneuvering vehicle (OMV) to a space station. The effect of the removal of the range and rate displays (simulating a ranging instrumentation failure) was also examined. Naive subjects were capable of achieving a high success rate in performing simulated docking maneuvers without extensive training. Failure rate was a function of individual differences; there was no treatment effect on failure rate. The amount of time subjects reserved for final approach increased with starting velocity. Piloting of docking maneuvers was not significantly affected in any way by the removal of range and rate displays. Radial impulse was significant both by subject and by treatment. NASA's 0.1 percent rule, dictating an approach rate no greater than 0.1 percent of the range, is seen to be overly conservative for nominal docking missions.

  19. Modeling and docking antibody structures with Rosetta

    PubMed Central

    Weitzner, Brian D.; Jeliazkov, Jeliazko R.; Lyskov, Sergey; Marze, Nicholas; Kuroda, Daisuke; Frick, Rahel; Adolf-Bryfogle, Jared; Biswas, Naireeta; Dunbrack, Roland L.; Gray, Jeffrey J.

    2017-01-01

    We describe Rosetta-based computational protocols for predicting the three-dimensional structure of an antibody from sequence (RosettaAntibody) and then docking the antibody to protein antigens (SnugDock). Antibody modeling leverages canonical loop conformations to graft large segments from experimentally-determined structures as well as (1) energetic calculations to minimize loops, (2) docking methodology to refine the VL–VH relative orientation, and (3) de novo prediction of the elusive complementarity determining region (CDR) H3 loop. To alleviate model uncertainty, antibody–antigen docking resamples CDR loop conformations and can use multiple models to represent an ensemble of conformations for the antibody, the antigen or both. These protocols can be run fully-automated via the ROSIE web server (http://rosie.rosettacommons.org/) or manually on a computer with user control of individual steps. For best results, the protocol requires roughly 1,000 CPU-hours for antibody modeling and 250 CPU-hours for antibody–antigen docking. Tasks can be completed in under a day by using public supercomputers. PMID:28125104

  20. Pressure Decay Testing Methodology for Quantifying Leak Rates of Full-Scale Docking System Seals

    NASA Technical Reports Server (NTRS)

    Dunlap, Patrick H., Jr.; Daniels, Christopher C.; Wasowski, Janice L.; Garafolo, Nicholas G.; Penney, Nicholas; Steinetz, Bruce M.

    2010-01-01

    NASA is developing a new docking system to support future space exploration missions to low-Earth orbit and the Moon. This system, called the Low Impact Docking System, is a mechanism designed to connect the Orion Crew Exploration Vehicle to the International Space Station, the lunar lander (Altair), and other future Constellation Project vehicles. NASA Glenn Research Center is playing a key role in developing the main interface seal for this docking system. This seal will be relatively large with an outside diameter in the range of 54 to 58 in. (137 to 147 cm). As part of this effort, a new test apparatus has been designed, fabricated, and installed to measure leak rates of candidate full-scale seals under simulated thermal, vacuum, and engagement conditions. Using this test apparatus, a pressure decay testing and data processing methodology has been developed to quantify full-scale seal leak rates. Tests performed on untreated 54 in. diameter seals at room temperature in a fully compressed state resulted in leak rates lower than the requirement of less than 0.0025 lbm, air per day (0.0011 kg/day).

  1. MS Wisoff moves stowage item through transfer tunnel

    NASA Image and Video Library

    1997-01-12

    STS081-E-05100 (12 Jan. 1997) --- Astronaut Peter J. K. (Jeff) Wisoff, mission specialist, carries a stowage drawer from the middeck of the Space Shuttle Atlantis' crew cabin through a connective tunnel into the Spacehab Double Module (DM). In a few days, Wisoff and his five crew mates are scheduled to dock with Russia's Mir Space Station and pick up John E. Blaha, NASA astronaut who has been serving as a cosmonaut guest researcher since September, 1996. Astronaut Jerry M. Linenger will replace Blaha onboard Mir and the transfer will mark the second such direct exchange of cosmonaut guest researchers, though Linenger will be the fourth United States astronaut to spend a lengthy stay on Mir.

  2. Accessible high-throughput virtual screening molecular docking software for students and educators.

    PubMed

    Jacob, Reed B; Andersen, Tim; McDougal, Owen M

    2012-05-01

    We survey low cost high-throughput virtual screening (HTVS) computer programs for instructors who wish to demonstrate molecular docking in their courses. Since HTVS programs are a useful adjunct to the time consuming and expensive wet bench experiments necessary to discover new drug therapies, the topic of molecular docking is core to the instruction of biochemistry and molecular biology. The availability of HTVS programs coupled with decreasing costs and advances in computer hardware have made computational approaches to drug discovery possible at institutional and non-profit budgets. This paper focuses on HTVS programs with graphical user interfaces (GUIs) that use either DOCK or AutoDock for the prediction of DockoMatic, PyRx, DockingServer, and MOLA since their utility has been proven by the research community, they are free or affordable, and the programs operate on a range of computer platforms.

  3. MOLA: a bootable, self-configuring system for virtual screening using AutoDock4/Vina on computer clusters.

    PubMed

    Abreu, Rui Mv; Froufe, Hugo Jc; Queiroz, Maria João Rp; Ferreira, Isabel Cfr

    2010-10-28

    Virtual screening of small molecules using molecular docking has become an important tool in drug discovery. However, large scale virtual screening is time demanding and usually requires dedicated computer clusters. There are a number of software tools that perform virtual screening using AutoDock4 but they require access to dedicated Linux computer clusters. Also no software is available for performing virtual screening with Vina using computer clusters. In this paper we present MOLA, an easy-to-use graphical user interface tool that automates parallel virtual screening using AutoDock4 and/or Vina in bootable non-dedicated computer clusters. MOLA automates several tasks including: ligand preparation, parallel AutoDock4/Vina jobs distribution and result analysis. When the virtual screening project finishes, an open-office spreadsheet file opens with the ligands ranked by binding energy and distance to the active site. All results files can automatically be recorded on an USB-flash drive or on the hard-disk drive using VirtualBox. MOLA works inside a customized Live CD GNU/Linux operating system, developed by us, that bypass the original operating system installed on the computers used in the cluster. This operating system boots from a CD on the master node and then clusters other computers as slave nodes via ethernet connections. MOLA is an ideal virtual screening tool for non-experienced users, with a limited number of multi-platform heterogeneous computers available and no access to dedicated Linux computer clusters. When a virtual screening project finishes, the computers can just be restarted to their original operating system. The originality of MOLA lies on the fact that, any platform-independent computer available can he added to the cluster, without ever using the computer hard-disk drive and without interfering with the installed operating system. With a cluster of 10 processors, and a potential maximum speed-up of 10x, the parallel algorithm of MOLA performed with a speed-up of 8,64× using AutoDock4 and 8,60× using Vina.

  4. A feasibility study of unmanned rendezvous and docking in Mars orbit: Midterm review

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The ascent, rendezvous, docking and sample transfer operations in a potential MSSR mission that uses the Mars orbital rendezvous mode are considered. In order that the design choices made for these operations remain compatible with the rest of the mission, the impact on the Earth launch, Mars landing and orbiting and Earth return phase are also being assessed. The selection and description of a preliminary baseline concept are presented.

  5. Fuzzy logic techniques for rendezvous and docking of two geostationary satellites

    NASA Technical Reports Server (NTRS)

    Ortega, Guillermo

    1995-01-01

    Large assemblings in space require the ability to manage rendezvous and docking operations. In future these techniques will be required for the gradual build up of big telecommunication platforms in the geostationary orbit. The paper discusses the use of fuzzy logic to model and implement a control system for the docking/berthing of two satellites in geostationary orbit. The system mounted in a chaser vehicle determines the actual state of both satellites and generates torques to execute maneuvers to establish the structural latching. The paper describes the proximity operations to collocate the two satellites in the same orbital window, the fuzzy guidance and navigation of the chaser approaching the target and the final Fuzzy berthing. The fuzzy logic system represents a knowledge based controller that realizes the close loop operations autonomously replacing the conventional control algorithms. The goal is to produce smooth control actions in the proximity of the target and during the docking to avoid disturbance torques in the final assembly orbit. The knowledge of the fuzzy controller consists of a data base of rules and the definitions of the fuzzy sets. The knowledge of an experienced spacecraft controller is captured into a set of rules forming the Rules Data Base.

  6. Russian_Progress_Cargo_Craft_Docks_to_the_International_Space_Station

    NASA Image and Video Library

    2018-02-15

    Following its two-day journey to the International Space Station, the Progress 69 cargo craft automatically docked to the aft port of the Zvezda service module at 5:38 a.m. EST while traveling about 250 miles over the east of the Philippines. The Russian resupply spacecraft was carrying more than three tons of food, fuel and supplies for the space station’s Expedition 54 crew. It launched two days earlier at 3:13 a.m. EST (2:13 p.m. local time) on Tuesday, Feb. 13, from the Baikonur Cosmodrome in Kazakhstan.

  7. Homology modeling, molecular docking and electrostatic potential analysis of MurF ligase from Klebsiella pneumonia

    PubMed Central

    Sivaramakrishnan, Venkatabalasubramanian; Thiyagarajan, Chinnaiyan; Kalaivanan, Sivakumaran; Selvakumar, Raj; Anusuyadevi, Muthuswamy; Jayachandran, Kesavan Swaminathan

    2012-01-01

    In spite of availability of moderately protective vaccine and antibiotics, new antibacterial agents are urgently needed to decrease the global incidence of Klebsiella pneumonia infections. MurF ligase, a key enzyme, which participates in the bacterial cell wall assembly, is indispensable to existence of K. pneumonia. MurF ligase lack mammalian vis-à-vis and have high specificity, uniqueness, and occurrence only in eubacteria, epitomizing them as promising therapeutic targets for intervention. In this study, we present a unified approach involving homology modeling and molecular docking studies on MurF ligase enzyme. As part of this study, a homology model of K. pneumonia (MurF ligase) enzyme was predicted for the first time in order to carry out structurebased drug design. The accuracy of the model was further validated using different computational approaches. The comparative molecular docking study on this enzyme was undertaken using different phyto-ligands from Desmodium sp. and a known antibiotic Ciprofloxacin. The docking analysis indicated the importance of hotspots (HIS 281 and ASN 282) within the MurF binding pocket. The Lipinski's rule of five was analyzed for all ligands considered for this study by calculating the ADME/Tox, drug likeliness using Qikprop simulation. Only ten ligands were found to comply with the Lipinski rule of five. Based on the molecular docking results and Lipinki values 6-Methyltetrapterol A was confirmed as a promising lead compound. The present study should therefore play a guiding role in the experimental design and development of 6-Methyltetrapterol A as a bactericidal agent. PMID:22715301

  8. Sterility Testing of Prototype Plastic Aseptic Docking Tubes

    DTIC Science & Technology

    1982-09-01

    Bacillus stearothermophilus CL21. AmerRACT (Coat~e- aeids uIf 8" niev teIi by block n"Unbee) Fifty-nine pairs of sterile docking tabs, manufactured...of Bacillus stearothermophilus , _J sealed, and flushed with sterile culture medium. Twenty five percent of the LA_.. seals failed because of...were similarly attached to sterile tubes of Becton Dickenson supplemented peptone broth. A 25 ul aliquot of Bacillus stearothermophilus spores (Ix]O

  9. A Comparison of Candidate Seal Designs for Future Docking Systems

    NASA Technical Reports Server (NTRS)

    Dunlap, Patrick, H., Jr.; Steinetz, Bruce, M.

    2012-01-01

    NASA is developing a new docking system to support future space exploration missions to low Earth orbit, the Moon, and other destinations. A key component of this system is the seal at the main docking interface which inhibits the loss of cabin air once docking is complete. Depending on the mission, the seal must be able to dock in either a seal-on-flange or seal-on-seal configuration. Seal-on-flange mating would occur when a docking system equipped with a seal docks to a system with a flat metal flange. This would occur when a vehicle docks to a node on the International Space Station. Seal-on-seal mating would occur when two docking systems equipped with seals dock to each other. Two types of seal designs were identified for this application: Gask-O-seals and multi-piece seals. Both types of seals had a pair of seal bulbs to satisfy the redundancy requirement. A series of performance assessments and comparisons were made between the candidate seal designs indicating that they meet the requirements for leak rate and compression and adhesion loads under a range of operating conditions. Other design factors such as part count, integration into the docking system tunnel, seal-on-seal mating, and cost were also considered leading to the selection of the multi-piece seal design for the new docking system. The results of this study can be used by designers of future docking systems and other habitable volumes to select the seal design best-suited for their particular application.

  10. Carbon Dioxide Removal Troubleshooting aboard the International Space Station (ISS) during Space Shuttle (STS) Docked Operations

    NASA Technical Reports Server (NTRS)

    Matty, Christopher M.; Cover, John M.

    2009-01-01

    The International Space Station (ISS) represents a largely closed-system habitable volume which requires active control of atmospheric constituents, including removal of exhaled Carbon Dioxide (CO2). The ISS provides a unique opportunity to observe system requirements for (CO2) removal. CO2 removal is managed by the Carbon Dioxide Removal Assembly (CDRA) aboard the US segment of ISS and by Lithium Hydroxide (LiOH) aboard the Space Shuttle (STS). While the ISS and STS are docked, various methods are used to balance the CO2 levels between the two vehicles, including mechanical air handling and management of general crew locations. Over the course of ISS operation, several unexpected anomalies have occurred which have required troubleshooting, including possible compromised performance of the CDRA and LiOH systems, and possible imbalance in CO2 levels between the ISS and STS while docked. This paper will cover efforts to troubleshoot the CO2 removal systems aboard the ISS and docked STS.

  11. Review of Full-Scale Docking Seal Testing Capabilities

    NASA Technical Reports Server (NTRS)

    Dunlap, Patrick H., Jr.; Penney, Nicholas; Wasowski, Janice L.; Daniels, Christopher C.; Steinetz, Bruce M.

    2008-01-01

    NASA is developing a new docking system to support future space exploration missions to low-Earth orbit, the Moon, and Mars. This mechanism, called the Low Impact Docking System (LIDS), is designed to connect pressurized space vehicles and structures including the Crew Exploration Vehicle, International Space Station, and lunar lander. NASA Glenn Research Center (GRC) is playing a key role in developing the main interface seal for this new docking system. These seals will be approximately 147 cm (58 in.) in diameter. To evaluate the performance of the seals under simulated operating conditions, NASA GRC is developing two new test rigs: a non-actuated version that will be used to measure seal leak rates and an actuated test rig that will be able to measure both seal leak rates and loads. Both test rigs will be able to evaluate the seals under seal-on-seal or seal-on-plate configurations at temperatures from -50 to 50 C (-58 to 122 F) under operational and pre-flight checkout pressure gradients in both aligned and misaligned conditions.

  12. Insight into the da Vinci® Xi - technical notes for single-docking left-sided colorectal procedures.

    PubMed

    Ngu, James Chi-Yong; Sim, Sarah; Yusof, Sulaiman; Ng, Chee-Yung; Wong, Andrew Siang-Yih

    2017-12-01

    The adoption of robot-assisted laparoscopic colorectal surgery has been hampered by issues with docking, operative duration, technical difficulties in multi-quadrant access, and cost. The da Vinci® Xi has been designed to overcome some of these limitations. We describe our experience with the system and offer technical insights to its application in left-sided colorectal procedures. Our initial series of left-sided robotic colorectal procedures was evaluated. Patient demographics and operative outcomes were recorded prospectively using a predefined database. Between March 2015 and April 2016, 54 cases of robot-assisted laparoscopic left-sided colorectal procedures were successfully completed with no cases of conversion. The majority were low anterior resections for colorectal malignancies. Using the da Vinci® Xi Surgical System, multi-quadrant surgery involving dissection from the splenic flexure to the pelvis was possible without redocking. The da Vinci® Xi simplifies the docking procedure and makes single-docking feasible for multi-quadrant left-sided colorectal procedures. Copyright © 2016 John Wiley & Sons, Ltd.

  13. Neural networks: Alternatives to conventional techniques for automatic docking

    NASA Technical Reports Server (NTRS)

    Vinz, Bradley L.

    1994-01-01

    Automatic docking of orbiting spacecraft is a crucial operation involving the identification of vehicle orientation as well as complex approach dynamics. The chaser spacecraft must be able to recognize the target spacecraft within a scene and achieve accurate closing maneuvers. In a video-based system, a target scene must be captured and transformed into a pattern of pixels. Successful recognition lies in the interpretation of this pattern. Due to their powerful pattern recognition capabilities, artificial neural networks offer a potential role in interpretation and automatic docking processes. Neural networks can reduce the computational time required by existing image processing and control software. In addition, neural networks are capable of recognizing and adapting to changes in their dynamic environment, enabling enhanced performance, redundancy, and fault tolerance. Most neural networks are robust to failure, capable of continued operation with a slight degradation in performance after minor failures. This paper discusses the particular automatic docking tasks neural networks can perform as viable alternatives to conventional techniques.

  14. DOVIS: an implementation for high-throughput virtual screening using AutoDock.

    PubMed

    Zhang, Shuxing; Kumar, Kamal; Jiang, Xiaohui; Wallqvist, Anders; Reifman, Jaques

    2008-02-27

    Molecular-docking-based virtual screening is an important tool in drug discovery that is used to significantly reduce the number of possible chemical compounds to be investigated. In addition to the selection of a sound docking strategy with appropriate scoring functions, another technical challenge is to in silico screen millions of compounds in a reasonable time. To meet this challenge, it is necessary to use high performance computing (HPC) platforms and techniques. However, the development of an integrated HPC system that makes efficient use of its elements is not trivial. We have developed an application termed DOVIS that uses AutoDock (version 3) as the docking engine and runs in parallel on a Linux cluster. DOVIS can efficiently dock large numbers (millions) of small molecules (ligands) to a receptor, screening 500 to 1,000 compounds per processor per day. Furthermore, in DOVIS, the docking session is fully integrated and automated in that the inputs are specified via a graphical user interface, the calculations are fully integrated with a Linux cluster queuing system for parallel processing, and the results can be visualized and queried. DOVIS removes most of the complexities and organizational problems associated with large-scale high-throughput virtual screening, and provides a convenient and efficient solution for AutoDock users to use this software in a Linux cluster platform.

  15. Evaluation of the respiratory health of dock workers who load grain cargoes in British Columbia.

    PubMed Central

    Dimich-Ward, H D; Kennedy, S M; Dittrick, M A; DyBuncio, A; Chan-Yeung, M

    1995-01-01

    OBJECTIVES--To investigate the respiratory health of dock workers who load grain cargoes. METHODS--The respiratory health of 118 dock workers who load grain cargoes in the ports of Vancouver and Prince Rupert was compared with that of 555 grain elevator workers from the same regions. 128 civic workers were used as an unexposed control group. RESULTS--The prevalences of chronic cough and phlegm were at least as high in dock workers as those found in the elevator workers, and when adjusted for differences in duration of employment and smoking, dock workers had an eightfold higher risk of developing chronic phlegm than did civic workers. Symptoms of eye and skin irritation that were experienced at least monthly were highest for dock workers. Average percentage of the predicted FEV1 and FVC for dock workers (mean 100.6% and 105.3% respectively) were similar to the civic workers but significantly higher than those found for elevator workers. Higher subjective estimates of duration of exposure to grain dust (hours/day) were associated with lower values of FEV1. CONCLUSIONS--The more intermittent grain dust exposure patterns of dock workers may have allowed for some recovery of lung function, but chronic respiratory symptoms were less labile. PMID:7795744

  16. Is the bipolar vessel sealer device an effective tool in robotic surgery? A retrospective analysis of our experience and a meta-analysis of the literature about different robotic procedures by investigating operative data and post-operative course.

    PubMed

    Ortenzi, Monica; Ghiselli, Roberto; Baldarelli, Maddalena; Cardinali, Luca; Guerrieri, Mario

    2018-04-01

    The latest robotic bipolar vessel sealing tools have been described to be effective allowing to perform procedures with reduced blood loss and shorter operative times. The aim of this study was to assess the efficacy and reliability of these devices applied in different robotic procedures. All robotic operations, between 2014 and 2016, were performed using the EndoWrist One VesselSealer (EWO, Intuitive Surgical, Sunnyvale, CA), a bipolar fully wristed device. Data, including age, gender, body mass index (BMI), were collected. Robot docking time, intraoperative blood loss, robot malfunctioning and overall operative time were analyzed. A meta-analysis of the literature was carried out to point the attention to three different parameters (mean blood loss, operating time and hospital stay) trying to identify how different coagulation devices may affect them. In 73 robotic procedures, the mean operative time was 118.2 minutes (75-125 minutes). Mean hospital stay was four days (2-10 days). There were two post-operative complications (2.74%). The bipolar vessel sealer offers the efficacy of bipolar diathermy and the advantages of a fully wristed instrument. It does not require any change of instruments for coagulation or involvement of the bedside assistant surgeon. These characteristics lead to a reduction in operative time.

  17. 18 CFR 1304.404 - Commercial marina harbor limits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... facilities at the dock, navigation and flood control requirements, optimum use of lands and land rights owned... to, changes in the ownership of the land base supporting the marina. ... harbor areas are determined by the extent of land rights held by the dock operator. The lakeward limits...

  18. 46 CFR 45.191 - Pre-departure requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., verification of mooring/docking space availability, and weather forecast checks were performed, and record the... voyage, the towing vessel master must conduct the following: (a) Weather forecast. Determine the marine weather forecast along the planned route, and contact the dock operator at the destination port to get an...

  19. 46 CFR 45.191 - Pre-departure requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., verification of mooring/docking space availability, and weather forecast checks were performed, and record the... voyage, the towing vessel master must conduct the following: (a) Weather forecast. Determine the marine weather forecast along the planned route, and contact the dock operator at the destination port to get an...

  20. 46 CFR 45.191 - Pre-departure requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., verification of mooring/docking space availability, and weather forecast checks were performed, and record the... voyage, the towing vessel master must conduct the following: (a) Weather forecast. Determine the marine weather forecast along the planned route, and contact the dock operator at the destination port to get an...

  1. 46 CFR 45.191 - Pre-departure requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., verification of mooring/docking space availability, and weather forecast checks were performed, and record the... voyage, the towing vessel master must conduct the following: (a) Weather forecast. Determine the marine weather forecast along the planned route, and contact the dock operator at the destination port to get an...

  2. International Docking Standard (IDSS) Interface Definition Document (IDD) . E; Revision

    NASA Technical Reports Server (NTRS)

    Kelly, Sean M.; Cryan, Scott P.

    2016-01-01

    This International Docking System Standard (IDSS) Interface Definition Document (IDD) is the result of a collaboration by the International Space Station membership to establish a standard docking interface to enable on-orbit crew rescue operations and joint collaborative endeavors utilizing different spacecraft. This IDSS IDD details the physical geometric mating interface and design loads requirements. The physical geometric interface requirements must be strictly followed to ensure physical spacecraft mating compatibility. This includes both defined components and areas that are void of components. The IDD also identifies common design parameters as identified in section 3.0, e.g., docking initial conditions and vehicle mass properties. This information represents a recommended set of design values enveloping a broad set of design reference missions and conditions, which if accommodated in the docking system design, increases the probability of successful docking between different spacecraft. This IDD does not address operational procedures or off-nominal situations, nor does it dictate implementation or design features behind the mating interface. It is the responsibility of the spacecraft developer to perform all hardware verification and validation, and to perform final docking analyses to ensure the needed docking performance and to develop the final certification loads for their application. While there are many other critical requirements needed in the development of a docking system such as fault tolerance, reliability, and environments (e.g. vibration, etc.), it is not the intent of the IDSS IDD to mandate all of these requirements; these requirements must be addressed as part of the specific developer's unique program, spacecraft and mission needs. This approach allows designers the flexibility to design and build docking mechanisms to their unique program needs and requirements. The purpose of the IDSS IDD is to provide basic common design parameters to allow developers to independently design compatible docking systems. The IDSS is intended for uses ranging from crewed to autonomous space vehicles, and from Low Earth Orbit (LEO) to deep-space exploration missions.The purpose of the IDSS IDD is to provide basic common design parameters to allow developers to independently design compatible docking systems. The IDSS is intended for uses ranging from crewed to autonomous space vehicles, and from Low Earth Orbit (LEO) to deep-space exploration missions. The purpose of the IDSS IDD is to provide basic common design parameters to allow developers to independently design compatible docking systems. The IDSS is intended for uses ranging from crewed to autonomous space vehicles, and from Low Earth Orbit (LEO) to deep-space exploration missions.

  3. Hydra Rendezvous and Docking Sensor

    NASA Technical Reports Server (NTRS)

    Roe, Fred; Carrington, Connie

    2007-01-01

    The U.S. technology to support a CEV AR&D activity is mature and was developed by NASA and supporting industry during an extensive research and development program conducted during the 1990's and early 2000 time frame at the Marshall Space Flight Center. Development and demonstration of a rendezvous/docking sensor was identified early in the AR&D Program as the critical enabling technology that allows automated proxinity operations and docking. A first generation rendezvous/docking sensor, the Video Guidance Sensor (VGS) was developed and successfully flown on STS 87 and again on STS 95, proving the concept of a video-based sensor. Advances in both video and signal processing technologies and the lessons learned from the two successful flight experiments provided a baseline for the development of a new generation of video based rendezvous/docking sensor. The Advanced Video Guidance Sensor (AVGS) has greatly increased performance and additional capability for longer-range operation. A Demonstration Automatic Rendezvous Technology (DART) flight experiment was flown in April 2005 using AVGS as the primary proximity operations sensor. Because of the absence of a docking mechanism on the target satellite, this mission did not demonstrate the ability of the sensor to coltrold ocking. Mission results indicate that the rendezvous sensor operated successfully in "spot mode" (2 km acquisition of the target, bearing data only) but was never commanded to "acquire and track" the docking target. Parts obsolescence issues prevent the construction of current design AVGS units to support the NASA Exploration initiative. This flight proven AR&D technology is being modularized and upgraded with additional capabilities through the Hydra project at the Marshall Space Flight Center. Hydra brings a unique engineering approach and sensor architecture to the table, to solve the continuing issues of parts obsolescence and multiple sensor integration. This paper presents an approach to sensor hardware trades, to address the needs of future vehicles that may rendezvous and dock with the International Space Station (ISS). It will also discuss approaches for upgrading AVGS to address parts obsolescence, and concepts for modularizing the sensor to provide configuration flexibility for multiple vehicle applications. Options for complementary sensors to be integrated into the multi-head Hydra system will also be presented. Complementary sensor options include ULTOR, a digital image correlator system that could provide relative six-degree-of-freedom information independently from AVGS, and time-of-flight sensors, which determine the range between vehicles by timing pulses that travel from the sensor to the target and back. Common targets and integrated targets, suitable for use with the multi-sensor options in Hydra, will also be addressed.

  4. Suitlock Docking Mechanism

    NASA Technical Reports Server (NTRS)

    Culbertson, Philip, Jr. (Inventor)

    1997-01-01

    An environmental protective suit used for hazardous clean-up or space applications includes a suitlock docking mechanism that allows for easy egress and ingress of a crew member between a sealed vessel and a possibly contaminated environment. The suitlock docking mechanism comprises a single actuator that controls latches which, in turn, respectfully control rack and pinion assemblies that allow for easy removal and attachment of a life support equipment enclosure shell to the environmental protective suit or to the vehicle from which the operator performs his/her duties.

  5. The use of docking-based comparative intermolecular contacts analysis to identify optimal docking conditions within glucokinase and to discover of new GK activators

    NASA Astrophysics Data System (ADS)

    Taha, Mutasem O.; Habash, Maha; Khanfar, Mohammad A.

    2014-05-01

    Glucokinase (GK) is involved in normal glucose homeostasis and therefore it is a valid target for drug design and discovery efforts. GK activators (GKAs) have excellent potential as treatments of hyperglycemia and diabetes. The combined recent interest in GKAs, together with docking limitations and shortages of docking validation methods prompted us to use our new 3D-QSAR analysis, namely, docking-based comparative intermolecular contacts analysis (dbCICA), to validate docking configurations performed on a group of GKAs within GK binding site. dbCICA assesses the consistency of docking by assessing the correlation between ligands' affinities and their contacts with binding site spots. Optimal dbCICA models were validated by receiver operating characteristic curve analysis and comparative molecular field analysis. dbCICA models were also converted into valid pharmacophores that were used as search queries to mine 3D structural databases for new GKAs. The search yielded several potent bioactivators that experimentally increased GK bioactivity up to 7.5-folds at 10 μM.

  6. Photo - Apollo/Saturn (A/S)-11 w/Flotation Collar Secured - Ship's Hoist

    NASA Image and Video Library

    1969-01-01

    S69-20086 (13 March 1969) --- The Apollo 9 Command Module (CM), with flotation collar still attached, is hoisted aboard the prime recovery ship, USS Guadalcanal, during recovery operations. The Apollo 9 crew, astronauts James A. McDivitt, David R. Scott, and Russell L. Schweickart, had already been picked up earlier by helicopter and flown to the dock of the carrier. Splashdown occurred at 12:00:53 p.m. (EST), March 13, 1969, only 4.5 nautical miles from the aircraft carrier, to conclude a successful 10-day Earth-orbital space mission.

  7. NASA Administrator Dan Goldin and Bob Sieck on SLF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    NASA Administrator Daniel S. Goldin (center) and KSC Director of Shuttle Operations Robert B. Sieck (right) discuss the successful conclusion of the STS-81 mission with Mission Commander Michael A. Baker (left). They are underneath the Space Shuttle orbiter Atlantis after the space plane landed on Runway 33 at the KSC Shuttle Landing Facility at 9:22:44 a.m. EST Jan. 22 to conclude the fifth Shuttle-Mir docking mission. At main gear touchdown, the STS-81 mission duration was 10 days, 4 hours, 55 minutes. This was the 34th KSC landing in Shuttle history.

  8. Space Operations Center System Analysis: Requirements for a Space Operations Center, revision A

    NASA Technical Reports Server (NTRS)

    Woodcock, G. R.

    1982-01-01

    The system and program requirements for a space operations center as defined by systems analysis studies are presented as a guide for future study and systems definition. Topics covered include general requirements for safety, maintainability, and reliability, service and habitat modules, the health maintenance facility; logistics modules; the docking tunnel; and subsystem requirements (structures, electrical power, environmental control/life support; extravehicular activity; data management; communications and tracking; docking/berthing; flight control/propulsion; and crew support). Facilities for flight support, construction, satellite and mission servicing, and fluid storage are included as well as general purpose support equipment.

  9. Magnet-Based System for Docking of Miniature Spacecraft

    NASA Technical Reports Server (NTRS)

    Howard, Nathan; Nguyen, Hai D.

    2007-01-01

    A prototype system for docking a miniature spacecraft with a larger spacecraft has been developed by engineers at the Johnson Space Center. Engineers working on Mini AERCam, a free-flying robotic camera, needed to find a way to successfully dock and undock their miniature spacecraft to refuel the propulsion and recharge the batteries. The subsystems developed (see figure) include (1) a docking port, designed for the larger spacecraft, which contains an electromagnet, a ball lock mechanism, and a service probe; and (2) a docking cluster, designed for the smaller spacecraft, which contains either a permanent magnet or an electromagnet. A typical docking operation begins with the docking spacecraft maneuvering into position near the docking port on the parent vehicle. The electromagnet( s) are then turned on, and, if necessary, the docking spacecraft is then maneuvered within the capture envelope of the docking port. The capture envelope for this system is approximated by a 5-in. (12.7-cm) cube centered on the front of the docking-port electromagnet and within an angular misalignment of <30 . Thereafter, the magnetic forces draw the smaller spacecraft toward the larger one and this brings the spacecraft into approximate alignment prior to contact. Mechanical alignment guides provide the final rotational alignment into one of 12 positions. Once the docking vehicle has been captured magnetically in the docking port, the ball-lock mechanism is activated, which locks the two spacecraft together. At this point the electromagnet( s) are turned off, and the service probe extended if recharge and refueling are to be performed. Additionally, during undocking, the polarity of one electromagnet can be reversed to provide a gentle push to separate the two spacecraft. This system is currently being incorporated into the design of Mini AERCam vehicle.

  10. The Mechanical Performance of Subscale Candidate Elastomer Docking Seals

    NASA Technical Reports Server (NTRS)

    Bastrzyk, Marta B.; Daniels, Christopher C.

    2010-01-01

    The National Aeronautics and Space Administration is developing a Low Impact Docking System (LIDS) for future exploration missions. The mechanism is a new state-of-the-art device for in-space assembly of structures and rendezvous of vehicles. At the interface between two pressurized modules, each with a version of the LIDS attached, a composite elastomer-metal seal assembly prevents the breathable air from escaping into the vacuum of space. Attached to the active LIDS, this seal mates against the passive LIDS during docking operation. The main interface seal assembly must exhibit low leak and outgas values, must be able to withstand various harsh space environments, must remain operational over a range of temperatures from -50 C to 75 C, and perform after numerous docking cycles. This paper presents results from a comprehensive study of the mechanical performance of four candidate subscale seal assembly designs at -50, 23, 50, and 75 C test temperatures. In particular, the force required to fully compress the seal during docking, and that which is required for separation during the undocking operation were measured. The height of subscale main interface seal bulbs, as well as the test temperature, were shown to have a significant effect on the forces the main interface seal of the LIDS may experience during docking and undocking operations. The average force values required to fully compress each of the seal assemblies were shown to increase with test temperature by approximately 50% from -50 to 75 C. Also, the required compression forces were shown to increase as the height of the seal bulb was increased. The seal design with the tallest elastomer seal bulb, which was 31% taller than that with the shortest bulb, required force values approximately 45% higher than those for the shortest bulb, independent of the test temperature. The force required to separate the seal was shown to increase with decreasing temperature after 15 hours of simulated docking. No adhesion force was observed at 75 C, while magnitudes of up to 235 lbf were recorded at the refrigerated temperature. In addition, the adhesion force was observed to increase with bulb height. When compared with the LIDS program requirements, the measured compression force values were found to be below the maximum allowable load allotted to the main interface seal. However, the measured adhesion force values at the refrigerated test temperature were found to exceed the program limits.

  11. GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM RIGHT TO LEFT, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM RIGHT TO LEFT, PETROLEUM OPERATIONS BUILDING (BUILDING, 2840), SECURITY POLICE CENTRAL CONTROL BUILDING (BUILDING 2841). MAINTENANCE DOCK (BUILDING 2837) AND MAINTENANCE DOCK (BUILDING 2890). VIEW TO NORTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY

  12. Docking Mechanism on Progress 52

    NASA Image and Video Library

    2014-02-03

    ISS038-E-041175 (3 Feb. 2014) --- This close-up view shows the docking mechanism of the unpiloted Russian ISS Progress 52 resupply ship as it undocks from the International Space Station's Pirs Docking Compartment at 11:21 a.m. (EST) on Feb. 3, 2014. The Progress backed away to a safe distance from the orbital complex to begin several days of tests to study thermal effects of space on its attitude control system. Filled with trash and other unneeded items, the Russian resupply ship will be commanded to re-enter Earth's atmosphere Feb. 11 and disintegrate harmlessly over the Pacific Ocean.

  13. Description of the docking module ECS for the Apollo-Soyuz Test Project.

    NASA Technical Reports Server (NTRS)

    Guy, W. W.; Jaax, J. R.

    1973-01-01

    The role of the Docking Module ECS (Environmental Control System) to be used on the Apollo-Soyuz Test mission is to provide a means for crewmen to transfer safely between the Apollo and Soyuz vehicles in a shirtsleeve environment. This paper describes the Docking Module ECS and includes the philosophy and rationale used in evaluating and selecting the capabilities that are required to satisfy the Docking Module's airlock function: (1) adjusting the pressure and composition of the atmosphere to effect crew transfer and (2) providing a shirtsleeve environment during transfer operations. An analytical evaluation is given of the environmental parameters (including CO2 level, humidity, and temperature) during a normal transfer timeline.

  14. A molecular docking study of phytochemical estrogen mimics from dietary herbal supplements.

    PubMed

    Powers, Chelsea N; Setzer, William N

    2015-01-01

    The purpose of this study is to use a molecular docking approach to identify potential estrogen mimics or anti-estrogens in phytochemicals found in popular dietary herbal supplements. In this study, 568 phytochemicals found in 17 of the most popular herbal supplements sold in the United States were built and docked with two isoforms of the estrogen receptor, ERα and ERβ (a total of 27 different protein crystal structures). The docking results revealed six strongly docking compounds in Echinacea, three from milk thistle (Silybum marianum), three from Gingko biloba, one from Sambucus nigra, none from maca (Lepidium meyenii), five from chaste tree (Vitex agnus-castus), two from fenugreek (Trigonella foenum-graecum), and two from Rhodiola rosea. Notably, of the most popular herbal supplements for women, there were numerous compounds that docked strongly with the estrogen receptor: Licorice (Glycyrrhiza glabra) had a total of 26 compounds strongly docking to the estrogen receptor, 15 with wild yam (Dioscorea villosa), 11 from black cohosh (Actaea racemosa), eight from muira puama (Ptychopetalum olacoides or P. uncinatum), eight from red clover (Trifolium pratense), three from damiana (Turnera aphrodisiaca or T. diffusa), and three from dong quai (Angelica sinensis). Of possible concern were the compounds from men's herbal supplements that exhibited strong docking to the estrogen receptor: Gingko biloba had three compounds, gotu kola (Centella asiatica) had two, muira puama (Ptychopetalum olacoides or P. uncinatum) had eight, and Tribulus terrestris had six compounds. This molecular docking study has revealed that almost all popular herbal supplements contain phytochemical components that may bind to the human estrogen receptor and exhibit selective estrogen receptor modulation. As such, these herbal supplements may cause unwanted side effects related to estrogenic activity.

  15. Department of Defense Dictionary of Military and Associated Terms. Incorporating the NATO Glossary of Terms and Definitions (English and French)

    DTIC Science & Technology

    1989-12-01

    can operate combination of airborne units, air transport - beyond the atmosphere. able units, and types of transport aircraft, de - pending on the mission...amphibious transport dock-(DOD) A ship de - anchor-See sinker. signed to transport and land troops, equip- ment, and supplies by means of embarked...attack and requiring emergency operations dock landing ship-(DOD) A naval ship de - during and following that attack. It may be signed to transport and

  16. STS-89 Commander Wilcutt poses the day before launch

    NASA Technical Reports Server (NTRS)

    1998-01-01

    STS-89 Commander Terrence Wilcutt poses in front of the crew's family and friends at KSC's Launch Pad 39A the day before the scheduled launch of Space Shuttle Endeavour. Final preparations are under way toward liftoff on Jan. 22 on the eighth mission to dock with the Russian Space Station Mir. After docking, Mission Specialist Andrew Thomas, Ph.D., will transfer to the space station, succeeding David Wolf, M.D., who will return to Earth aboard Endeavour. Dr. Thomas will live and work on Mir until June. STS-89 is scheduled for liftoff at 9:48 p.m. EST.

  17. Wilson on the AFD during STS-121

    NASA Image and Video Library

    2006-07-05

    S121-E-05438 (5 July 2006) --- Astronaut Stephanie D. Wilson, STS-121 mission specialist, on Discovery's flight deck during flight day two activities, on the eve of one of the mission's busiest days -- docking day with the International Space Station.

  18. Multiquadrant robotic colorectal surgery: the da Vinci Xi vs Si comparison.

    PubMed

    Protyniak, Bogdan; Jorden, Jeffrey; Farmer, Russell

    2018-03-01

    The newly introduced da Vinci Xi Surgical System hopes to address the shortcomings of its predecessor, specifically robotic arm restrictions and difficulty working in multiple quadrants. We compare the two robot platforms in multiquadrant surgery at a major colorectal referral center. Forty-four patients in the da Vinci Si group and 26 patients in the Xi group underwent sigmoidectomy or low anterior resection between 2014 and 2016. Patient demographics, operative variables, and postoperative outcomes were compared using descriptive statistics. Both groups were similar in age, sex, BMI, pelvic surgeries, and ASA class. Splenic flexure was mobilized in more (p = 0.045) da Vinci Xi cases compared to da Vinci Si both for sigmoidectomy (50 vs 15.4%) and low anterior resection (60 vs 29%). There was no significant difference in operative time (219.9 vs 224.7 min; p = 0.640), blood loss (170.0 vs 188.1 mL; p = 0.289), length of stay (5.7 vs 6 days; p = 0.851), or overall complications (26.9 vs 22.7%; p = 0.692) between the da Vinci Xi and Si groups, respectively. Single-dock multiquadrant robotic surgery, measured by splenic flexure mobilization with concomitant pelvic dissection, was more frequently performed using the da Vinci Xi platform with no increase in operative time, bleeding, or postoperative complications. The new platform provides surgeons an easier alternative to the da Vinci Si dual docking or combined robotic/laparoscopic multiquadrant surgery.

  19. New Additions to the ClusPro Server Motivated by CAPRI

    PubMed Central

    Vajda, Sandor; Yueh, Christine; Beglov, Dmitri; Bohnuud, Tanggis; Mottarella, Scott E.; Xia, Bing; Hall, David R.; Kozakov, Dima

    2016-01-01

    The heavily used protein-protein docking server ClusPro performs three computational steps as follows: (1) rigid body docking, (2) RMSD based clustering of the 1000 lowest energy structures, and (3) the removal of steric clashes by energy minimization. In response to challenges encountered in recent CAPRI targets, we added three new options to ClusPro. These are (1) accounting for Small Angle X-ray Scattering (SAXS) data in docking; (2) considering pairwise interaction data as restraints; and (3) enabling discrimination between biological and crystallographic dimers. In addition, we have developed an extremely fast docking algorithm based on 5D rotational manifold FFT, and an algorithm for docking flexible peptides that include known sequence motifs. We feel that these developments will further improve the utility of ClusPro. However, CAPRI emphasized several shortcomings of the current server, including the problem of selecting the right energy parameters among the five options provided, and the problem of selecting the best models among the 10 generated for each parameter set. In addition, results convinced us that further development is needed for docking homology models. Finally we discuss the difficulties we have encountered when attempting to develop a refinement algorithm that would be computationally efficient enough for inclusion in a heavily used server. PMID:27936493

  20. An autonomous rendezvous and docking system using cruise missile technologies

    NASA Technical Reports Server (NTRS)

    Jones, Ruel Edwin

    1991-01-01

    In November 1990 the Autonomous Rendezvous & Docking (AR&D) system was first demonstrated for members of NASA's Strategic Avionics Technology Working Group. This simulation utilized prototype hardware from the Cruise Missile and Advanced Centaur Avionics systems. The object was to show that all the accuracy, reliability and operational requirements established for a space craft to dock with Space Station Freedom could be met by the proposed system. The rapid prototyping capabilities of the Advanced Avionics Systems Development Laboratory were used to evaluate the proposed system in a real time, hardware in the loop simulation of the rendezvous and docking reference mission. The simulation permits manual, supervised automatic and fully autonomous operations to be evaluated. It is also being upgraded to be able to test an Autonomous Approach and Landing (AA&L) system. The AA&L and AR&D systems are very similar. Both use inertial guidance and control systems supplemented by GPS. Both use an Image Processing System (IPS), for target recognition and tracking. The IPS includes a general purpose multiprocessor computer and a selected suite of sensors that will provide the required relative position and orientation data. Graphic displays can also be generated by the computer, providing the astronaut / operator with real-time guidance and navigation data with enhanced video or sensor imagery.

  1. Automated Rendezvous and Capture System Development and Simulation for NASA

    NASA Technical Reports Server (NTRS)

    Roe, Fred D.; Howard, Richard T.; Murphy, Leslie

    2004-01-01

    The United States does not have an Automated Rendezvous and Capture/Docking (AR and C) capability and is reliant on manned control for rendezvous and docking of orbiting spacecraft. This reliance on the labor intensive manned interface for control of rendezvous and docking vehicles has a significant impact on the cost of the operation of the International Space Station (ISS) and precludes the use of any U.S. expendable launch capabilities for Space Station resupply. The Soviets have the capability to autonomously dock in space, but their system produces a hard docking with excessive force and contact velocity. Automated Rendezvous and Capture/Docking has been identified as a key enabling technology for the Space Launch Initiative (SLI) Program, DARPA Orbital Express and other DOD Programs. The development and implementation of an AR&C capability can significantly enhance system flexibility, improve safety, and lower the cost of maintaining, supplying, and operating the International Space Station. The Marshall Space Flight Center (MSFC) has conducted pioneering research in the development of an automated rendezvous and capture (or docking) (AR and C) system for U.S. space vehicles. This AR&C system was tested extensively using hardware-in-the-loop simulations in the Flight Robotics Laboratory, and a rendezvous sensor, the Video Guidance Sensor was developed and successfully flown on the Space Shuttle on flights STS-87 and STS-95, proving the concept of a video- based sensor. Further developments in sensor technology and vehicle and target configuration have lead to continued improvements and changes in AR&C system development and simulation. A new Advanced Video Guidance Sensor (AVGS) with target will be utilized on the Demonstration of Autonomous Rendezvous Technologies (DART) flight experiment in 2004.

  2. Integrating docking and molecular dynamics approaches for a series of proline-based 2,5-diketopiperazines as novel αβ-tubulin inhibitors.

    PubMed

    Fani, Najmeh; Bordbar, Abdol-Khalegh; Ghayeb, Yousef; Sepehri, Saghi

    2015-01-01

    In this work, docking tools were utilized in order to study the binding properties of more than five hundred of proline-based 2,5-diketopiperazine in the binding site of αβ-tubulin. Results revealed that 20 compounds among them showed lower binding energies in comparison with Tryprostatin-A, a well known tubulin inhibitor and therefore could be potential inhibitors of tubulin. However, the precise evaluation of binding poses represents the similar binding modes for all of these compounds and Tryprostatin-A. Finally, the best docked complex was subjected to a 25 ns molecular dynamics simulation to further validate the proposed binding mode of this compound.

  3. MS Linenger in sleep restraint

    NASA Image and Video Library

    1997-01-12

    STS081-E-5006 (12 Jan. 1997) --- Aboard the Space Shuttle Atlantis on its first day in orbit for the mission, astronaut Jerry M. Linenger, mission specialist, has arranged his sleep station to his liking and prepares for his first rest period. Linenger and five crew mates are flying the Spacehab Double Module (DM), replete with supplies for the three-man crew aboard Russia's Mir Space Station with which Atlantis will be docking later in the week. Linenger will trade places with John E. Blaha marking the second such exchange of American astronaut - cosmonaut guest researcher's aboard Mir. Blaha had replaced Shannon W. Lucid in September of 1996. The scene was recorded with an Electronic Still Camera (ESC) and later downlinked to flight controllers in Houston, Texas.

  4. Rendezvous and Docking Strategy for Crewed Segment of the Asteroid Redirect Mission

    NASA Technical Reports Server (NTRS)

    Hinkel, Heather D.; Cryan, Scott P.; D'Souza, Christopher; Dannemiller, David P.; Brazzel, Jack P.; Condon, Gerald L.; Othon, William L.; Williams, Jacob

    2014-01-01

    This paper will describe the overall rendezvous, proximity operations and docking (RPOD) strategy in support of the Asteroid Redirect Crewed Mission (ARCM), as part of the Asteroid Redirect Mission (ARM). The focus of the paper is on the crewed mission phase of ARM, starting with the establishment of Orion in the Distant Retrograde Orbit (DRO) and ending with docking to the Asteroid Redirect Vechicle (ARV). The paper will detail the sequence of maneuvers required to execute the rendezvous and proximity operations mission phases along with the on-board navigation strategies, including the final approach phase. The trajectories to be considered will include target vehicles in a DRO. The paper will also discuss the sensor requirements for rendezvous and docking and the various trade studies associated with the final sensor selection. Building on the sensor requirements and trade studies, the paper will include a candidate sensor concept of operations, which will drive the selection of the sensor suite; concurrently, it will be driven by higher level requirements on the system, such as crew timeline constraints and vehicle consummables. This paper will address how many of the seemingly competing requirements will have to be addressed to create a complete system and system design. The objective is to determine a sensor suite and trajectories that enable Orion to successfully rendezvous and dock with a target vehicle in trans lunar space. Finally, the paper will report on the status of a NASA action to look for synergy within RPOD, across the crewed and robotic asteroid missions.

  5. Mission commander Readdy on middeck

    NASA Image and Video Library

    1996-09-18

    STS79-E-5022 (18 September 1996) --- William F. Readdy, mission commander, checks on Spacehab prior to preparing for Day 4 docking of the Space Shuttle Atlantis with Russia's Mir Space Station, on flight day 3.

  6. Space tug automatic docking control study. LOCDOK users manual

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A users's manual for the computer programs involved in a study of the space tug docking simulation is presented. The following subjects are considered: (1) subroutine narratives, (2) program elements, (3) system subroutines, and (4) Univac 1108 cross reference listing. The functional and operational requirements for the computer programming are explained.

  7. 29 CFR 1952.172 - Level of Federal enforcement.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the means of access to said vehicles. (ii) Marine vessels construction operations (from the means of access of the shore). (iii) All afloat marine ship building and repair from the foot of the gangway. (iv) All ship building and repair in graving docks or dry docks. (v) All ship repairing done in marine...

  8. ATV docking ops

    NASA Image and Video Library

    2014-08-12

    ISS040-E-091673 (12 Aug. 2014) --- In the Zvezda Service Module, European Space Agency astronaut Alexander Gerst (right) and Russian cosmonaut Alexander Skvortsov, both Expedition 40 flight engineers, take a brief moment for a photo during the approach and docking operations of ESA's "Georges Lemaitre" Automated Transfer Vehicle-5 (ATV-5) to the International Space Station.

  9. The influence of prophylactic antibiotic administration on post-operative morbidity in dental implant surgery. A prospective double blind randomized controlled clinical trial.

    PubMed

    Nolan, Rory; Kemmoona, Maher; Polyzois, Ioannis; Claffey, Noel

    2014-02-01

    A prospective double-blind randomised controlled trial was conducted to test the effect of prophylactic antibiotics on post-operative morbidity and osseointegration of dental implants. Fifty-five subjects scheduled for implant surgery were enrolled. The patients were randomly assigned to the antibiotic (test group) and placebo (control group). Twenty-seven patients (test group) received 3 g amoxicillin one hour pre-operatively, and 28 patients (control group) received placebo capsules 1 h pre-operatively. No post-operative antibiotics were prescribed. Pain diaries and interference with daily activities diaries were kept by the patients for 1 week post-operatively. Signs of post-operative morbidity (swelling, bruising, suppuration and wound dehiscence) were recorded by the principal investigators at day 2 and day 7 following the operation. Osseointegration was assessed at 2nd stage surgery or 3-4 months post-operatively. The results of this study suggest that the use of prophylactic pre-operative antibiotics may result in higher dental implant survival rates (100% vs. 82%). Five implant failures, one in each of five patients, were reported in the placebo group and none in the antibiotic group (P = 0.0515). No significant differences were found for most of the signs of post-operative morbidity 2 and 7 days post-operatively. Only bruising at 2 days following the operation appeared to be higher in the placebo group (P = 0.0511). Post-operative pain (P = 0.01) and interference with daily activities (P = 0.01) appeared to be significantly lower for the antibiotic group after 7 days. Those patients with implant failure reported higher pain (based on the VAS scores) after 2 days (P = 0.003) and after 7 days (P = 0.0005), higher pain (based on the amount of analgesics used) after 7 days (P = 0.001) and higher interference with daily activities (based on the VAS scores) after 2 days (P = 0.005). The use of for dental implant surgery may be justified, as it appears to improve implant survival in the short term and also results in less post-operative pain and interference with daily activities. From the results of this study, it appears that prophylactic antibiotics may also be beneficial both in terms of implant survival, especially when the surgical procedure is prolonged due to its difficulty, high number of implants placed or operator's inexperience. © 2013 John Wiley & Sons A/S. Published by Blackwell Publishing Ltd.

  10. The Sensor Test for Orion RelNav Risk Mitigation (STORRM) Development Test Objective

    NASA Technical Reports Server (NTRS)

    Christian, John A.; Hinkel, Heather; D'Souza, Christopher N.; Maguire, Sean; Patangan, Mogi

    2011-01-01

    The Sensor Test for Orion Relative-Navigation Risk Mitigation (STORRM) Development Test Objective (DTO) flew aboard the Space Shuttle Endeavour on STS-134 in May- June 2011, and was designed to characterize the performance of the flash LIDAR and docking camera being developed for the Orion Multi-Purpose Crew Vehicle. The flash LIDAR, called the Vision Navigation Sensor (VNS), will be the primary navigation instrument used by the Orion vehicle during rendezvous, proximity operations, and docking. The DC will be used by the Orion crew for piloting cues during docking. This paper provides an overview of the STORRM test objectives and the concept of operations. It continues with a description of STORRM's major hardware components, which include the VNS, docking camera, and supporting avionics. Next, an overview of crew and analyst training activities will describe how the STORRM team prepared for flight. Then an overview of in-flight data collection and analysis is presented. Key findings and results from this project are summarized. Finally, the paper concludes with lessons learned from the STORRM DTO.

  11. Overall view of Mission Control Center during Apollo 14

    NASA Image and Video Library

    1971-01-31

    S71-16879 (31 Jan. 1971) --- Overall view of activity in the Mission Operations Control Room in the Mission Control Center during the Apollo 14 transposition and docking maneuvers. The Apollo 14 Lunar Module, still attached to the Saturn IVB stage, can be seen on the large television monitor. Due to difficulty with the docking mechanism six attempts were made before a successful "hard dock" of the Command Module with the Lunar Module was accomplished. Aboard the Command Module were astronauts Alan B. Shepard Jr., Stuart A. Roosa, and Edgar D. Mitchell.

  12. Training - Apollo-Soyuz Test Project (ASTP) - JSC

    NASA Image and Video Library

    1975-07-12

    S75-28485 (12 July 1975) --- Astronaut Vance D. Brand, command module pilot of the American ASTP prime crew, practices operating a Docking Module hatch during Apollo-Soyuz Test Project preflight training at NASA's Johnson Space Center. The Docking Module is designed to link the Apollo and Soyuz spacecraft during their docking mission in Earth orbit. Gary L. Doerre of JSC?s Crew Training and Procedures Division is working with Brand. Doerre is wearing a face mask to help prevent possible exposure to Brand of disease prior to the ASTP launch.

  13. Antidepressant-like activity of venlafaxine and clonidine in mice exposed to single prolonged stress - A model of post-traumatic stress disorder. Pharmacodynamic and molecular docking studies.

    PubMed

    Malikowska, Natalia; Fijałkowski, Łukasz; Nowaczyk, Alicja; Popik, Piotr; Sałat, Kinga

    2017-10-15

    Post-traumatic stress disorder (PTSD) is a growing issue worldwide characterized by stress and anxiety in response to re-experiencing traumatic events which strongly impair patient's quality of life and social functions. Available antidepressant and anxiolytic drugs are not efficacious in the majority of treated individuals. This necessitates a significant medical demand to develop novel therapeutic strategies for PTSD. Animal model of PTSD was induced using a mouse single prolonged stress protocol (mSPS). To assess the activity of venlafaxine and clonidine, the forced swim test (FST) was used repeatedly 24h, 3days, 8days, 15days and 25days after mSPS. To get insight into a possible mechanism of anti-PTSD action, molecular docking procedure was utilized for the most active drug. This in silico part comprised molecular docking of enantiomers of venlafaxine to human transporters for serotonin (hSERT), norepinephrine (hNET) and dopamine (hDAT). In mSPS-subjected mice FST revealed the effectiveness of venlafaxine, however in non SPS-subjected mice both venlafaxine and clonidine were active. Molecular docking studies indicated that the affinity of venlafaxine to monoamine transporters is growing in the following rank order: hDAT

  14. Optimization of pyDock for the new CAPRI challenges: Docking of homology-based models, domain-domain assembly and protein-RNA binding.

    PubMed

    Pons, Carles; Solernou, Albert; Perez-Cano, Laura; Grosdidier, Solène; Fernandez-Recio, Juan

    2010-11-15

    We describe here our results in the last CAPRI edition. We have participated in all targets, both as predictors and as scorers, using our pyDock docking methodology. The new challenges (homology-based modeling of the interacting subunits, domain-domain assembling, and protein-RNA interactions) have pushed our computer tools to the limits and have encouraged us to devise new docking approaches. Overall, the results have been quite successful, in line with previous editions, especially considering the high difficulty of some of the targets. Our docking approaches succeeded in five targets as predictors or as scorers (T29, T34, T35, T41, and T42). Moreover, with the inclusion of available information on the residues expected to be involved in the interaction, our protocol would have also succeeded in two additional cases (T32 and T40). In the remaining targets (except T37), results were equally poor for most of the groups. We submitted the best model (in ligand RMSD) among scorers for the unbound-bound target T29, the second best model among scorers for the protein-RNA target T34, and the only correct model among predictors for the domain assembly target T35. In summary, our excellent results for the new proposed challenges in this CAPRI edition showed the limitations and applicability of our approaches and encouraged us to continue developing methodologies for automated biomolecular docking. © 2010 Wiley-Liss, Inc.

  15. Do Clinical Results and Return-to-Sport Rates After Ulnar Collateral Ligament Reconstruction Differ Based on Graft Choice and Surgical Technique?

    PubMed

    Erickson, Brandon J; Cvetanovich, Gregory L; Frank, Rachel M; Bach, Bernard R; Cohen, Mark S; Bush-Joseph, Charles A; Cole, Brian J; Romeo, Anthony A

    2016-11-01

    Ulnar collateral ligament reconstruction (UCLR) has become a common procedure performed in overhead-throwing athletes of many athletic levels. The purpose of this study was to determine whether clinical outcomes and return-to-sport (RTS) rates differ among patients undergoing UCLR based on graft choice, surgical technique, athletic competition level, handedness, and treatment of the ulnar nerve. We hypothesized that no differences would exist in clinical outcomes or RTS rates between technique, graft choice, or other variables. Cohort study; Level of evidence, 3. All patients who underwent UCLR from January 1, 2004 through December 31, 2014 at a single institution were identified. Charts were reviewed to determine patient age, sex, date of surgery, sport played, handedness, athletic level, surgical technique, graft type, and complications. Patients were contacted via telephone to obtain the RTS rate, Conway-Jobe score, Timmerman-Andrews score, and Kerlan-Jobe Orthopaedic Clinic (KJOC) Shoulder and Elbow score. Eighty-five patients (mean age at surgery, 19.3 ± 4.7 years; 92% male; 78% right hand-dominant) underwent UCLR between 2004 and 2014 and were available for follow-up. Overall, 87% were baseball pitchers, 49.4% were college athletes, and 41.2% were high school athletes. No significant difference existed between the docking and double-docking techniques, graft choice, handedness, sex, activity level, and treatment of the ulnar nerve with regard to clinical outcomes, RTS, or subsequent surgeries (all P > .05). More complications were seen in the docking technique compared with the double-docking technique ( P = .036). Hamstring autograft was used more commonly with the docking technique ( P = .023) while allograft was used more commonly with the double-docking technique ( P = .0006). Both the docking and double-docking techniques produce excellent clinical outcomes in patients undergoing UCLR. No difference in outcome scores was seen between surgical technique or graft type. The double-docking technique had fewer complications than the docking technique.

  16. Building macromolecular assemblies by information-driven docking: introducing the HADDOCK multibody docking server.

    PubMed

    Karaca, Ezgi; Melquiond, Adrien S J; de Vries, Sjoerd J; Kastritis, Panagiotis L; Bonvin, Alexandre M J J

    2010-08-01

    Over the last years, large scale proteomics studies have generated a wealth of information of biomolecular complexes. Adding the structural dimension to the resulting interactomes represents a major challenge that classical structural experimental methods alone will have difficulties to confront. To meet this challenge, complementary modeling techniques such as docking are thus needed. Among the current docking methods, HADDOCK (High Ambiguity-Driven DOCKing) distinguishes itself from others by the use of experimental and/or bioinformatics data to drive the modeling process and has shown a strong performance in the critical assessment of prediction of interactions (CAPRI), a blind experiment for the prediction of interactions. Although most docking programs are limited to binary complexes, HADDOCK can deal with multiple molecules (up to six), a capability that will be required to build large macromolecular assemblies. We present here a novel web interface of HADDOCK that allows the user to dock up to six biomolecules simultaneously. This interface allows the inclusion of a large variety of both experimental and/or bioinformatics data and supports several types of cyclic and dihedral symmetries in the docking of multibody assemblies. The server was tested on a benchmark of six cases, containing five symmetric homo-oligomeric protein complexes and one symmetric protein-DNA complex. Our results reveal that, in the presence of either bioinformatics and/or experimental data, HADDOCK shows an excellent performance: in all cases, HADDOCK was able to generate good to high quality solutions and ranked them at the top, demonstrating its ability to model symmetric multicomponent assemblies. Docking methods can thus play an important role in adding the structural dimension to interactomes. However, although the current docking methodologies were successful for a vast range of cases, considering the variety and complexity of macromolecular assemblies, inclusion of some kind of experimental information (e.g. from mass spectrometry, nuclear magnetic resonance, cryoelectron microscopy, etc.) will remain highly desirable to obtain reliable results.

  17. STS-111 crew exits O&C building on way to LC-39A

    NASA Technical Reports Server (NTRS)

    2002-01-01

    KENNEDY SPACE CENTER, FLA. -- The STS-111 and Expedition 5 crews hurry from the Operations and Checkout Building for a second launch attempt aboard Space Shuttle Endeavour. From front to back are Pilot Paul Lockhart and Commander Kenneth Cockrell; astronaut Peggy Whitson; Expedition 5 Commander Valeri Korzun (RSA) and cosmonaut Sergei Treschev (RSA); and Mission Specialists Philippe Perrin (CNES) and Franklin Chang-Diaz. This mission marks the 14th Shuttle flight to the Space Station and the third Shuttle mission this year. Mission STS-111 is the 18th flight of Endeavour and the 110th flight overall in NASA's Space Shuttle program. On mission STS-111, astronauts will deliver the Leonardo Multi-Purpose Logistics Module, the Mobile Base System (MBS), and the Expedition Five crew to the Space Station. During the seven days Endeavour will be docked to the Station, three spacewalks will be performed dedicated to installing MBS and the replacement wrist-roll joint on the Station's Canadarm2 robotic arm. Endeavour will also carry the Expedition 5 crew, who will replace Expedition 4 on board the Station. Expedition 4 crew members will return to Earth with the STS-111 crew. Liftoff is scheduled for 5:22 p.m. EDT from Launch Pad 39A.

  18. KSC-97PC1428

    NASA Image and Video Library

    1997-09-25

    The five STS-86 mission specialists wave to the crowd of press representatives, KSC employees and other well-wishers as they depart from the Operations and Checkout Building. The three U.S. mission specialists (and their nicknames for this flight) are, from left, "too tall" Scott E. Parazynski, "just right" David A. Wolf and "too short" Wendy B. Lawrence. The two mission specialists representing foreign space agencies are Vladimir Georgievich Titov of the Russian Space Agency, in foreground at right, and Jean-Loup J.M. Chretien of the French Space Agency, CNES, in background at right. Commander James D. Wetherbee and Pilot Michael J. Bloomfield are out of the frame. STS-86 is slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. Wolf is scheduled to transfer to the Mir 24 crew for an approximate four-month stay aboard the Russian space station. Parazynski and Lawrence were withdrawn from training for an extended stay aboard the Mir Parazynski because he was too tall to fit safely in a Russian Soyuz spacecraft, and Lawrence because she was too short to fit into a Russian spacewalk suit. The crew is en route to Launch Pad 39A, where the Space Shuttle Atlantis awaits liftoff on the planned 10-day mission

  19. STS-86 Crew Walkout

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The five STS-86 mission specialists wave to the crowd of press representatives, KSC employees and other well-wishers as they depart from the Operations and Checkout Building. The three U.S. mission specialists (and their nicknames for this flight) are, from left, 'too tall' Scott E. Parazynski, 'just right' David A. Wolf and 'too short' Wendy B. Lawrence. The two mission specialists representing foreign space agencies are Vladimir Georgievich Titov of the Russian Space Agency, in foreground at right, and Jean-Loup J.M. Chretien of the French Space Agency, CNES, in background at right. Commander James D. Wetherbee and Pilot Michael J. Bloomfield are out of the frame. STS-86 is slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. Wolf is scheduled to transfer to the Mir 24 crew for an approximate four-month stay aboard the Russian space station. Parazynski and Lawrence were withdrawn from training for an extended stay aboard the Mir - Parazynski because he was too tall to fit safely in a Russian Soyuz spacecraft, and Lawrence because she was too short to fit into a Russian spacewalk suit. The crew is en route to Launch Pad 39A, where the Space Shuttle Atlantis awaits liftoff on the planned 10-day mission.

  20. ISS Progress 68 Docking Coverage

    NASA Image and Video Library

    2017-10-16

    The unpiloted Russian ISS Progress 68 cargo craft arrived at the International Space Station Oct. 16 on a resupply mission following a two day journey following its launch from the Baikonur Cosmodrome in Kazakhstan. The Progress delivered almost three tons of food, fuel and supplies for the Expedition 53 crew. The Progress automatically linked up to the Pirs Docking Compartment, where it will remain until next March.

  1. KSC-98pc1752

    NASA Image and Video Library

    1998-12-01

    KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, Center Director Roy Bridges, Program Manager of the International Space Station (ISS) Randy Brinkley, and STS-98 crew members Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialist Marsha Ivins wait for the unveiling of the name "Destiny" for the U.S. Lab module, which is behind them on a workstand. The lab, scheduled to be launched on Space Shuttle Endeavour in early 2000, will become the centerpiece of scientific research on the ISS. Polansky, Cockrell and Ivins are part of the five-member crew expected to be aboard. The Shuttle will spend six days docked to the station while the laboratory is attached and three space walks are conducted to complete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for station systems, including high data-rate communications, and maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights

  2. KSC-98pc1750

    NASA Image and Video Library

    1998-12-02

    KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, Center Director Roy Bridges (left), Program Manager of the International Space Station (ISS) Randy Brinkley (second from left) and (right) STS-98 Commander Ken Cockrell applaud the unveiling of the name Destiny given the U.S. Lab module. The lab, which is behind them on a workstand, is scheduled to be launched on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the ISS. Cockrell is part of the five-member crew expected to be aboard. The Shuttle will spend six days docked to the station while the laboratory is attached and three space walks are conducted to complete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for station systems, including high data-rate communications, and maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights

  3. Overview of LIDS Docking Seals Development

    NASA Technical Reports Server (NTRS)

    Dunlap, Pat; Steinetz, Bruce; Daniels, Chris

    2008-01-01

    NASA is developing a new docking system to support future space exploration missions to low-Earth orbit, the Moon, and Mars. This mechanism, called the Low Impact Docking System (LIDS), is designed to connect pressurized space vehicles and structures including the Crew Exploration Vehicle, International Space Station, and lunar lander. NASA Glenn Research Center (GRC) is playing a key role in developing the main interface seal for this new docking system. These seals will be approximately 147 cm (58 in.) in diameter. GRC is evaluating the performance of candidate seal designs under simulated operating conditions at both sub-scale and full-scale levels. GRC is ultimately responsible for delivering flight hardware seals to NASA Johnson Space Center around 2013 for integration into LIDS flight units.

  4. Space station full-scale docking/berthing mechanisms development

    NASA Technical Reports Server (NTRS)

    Burns, Gene C.; Price, Harold A.; Buchanan, David B.

    1988-01-01

    One of the most critical operational functions for the space station is the orbital docking between the station and the STS orbiter. The program to design, fabricate, and test docking/berthing mechanisms for the space station is described. The design reflects space station overall requirements and consists of two mating docking mechanism halves. One half is designed for use on the shuttle orbiter and incorporates capture and energy attenuation systems using computer controlled electromechanical actuators and/or attenuators. The mating half incorporates a flexible feature to allow two degrees of freedom at the module-to-module interface of the space station pressurized habitat volumes. The design concepts developed for the prototype units may be used for the first space station flight hardware.

  5. S4MPLE--Sampler for Multiple Protein-Ligand Entities: Methodology and Rigid-Site Docking Benchmarking.

    PubMed

    Hoffer, Laurent; Chira, Camelia; Marcou, Gilles; Varnek, Alexandre; Horvath, Dragos

    2015-05-19

    This paper describes the development of the unified conformational sampling and docking tool called Sampler for Multiple Protein-Ligand Entities (S4MPLE). The main novelty in S4MPLE is the unified dealing with intra- and intermolecular degrees of freedom (DoF). While classically programs are either designed for folding or docking, S4MPLE transcends this artificial specialization. It supports folding, docking of a flexible ligand into a flexible site and simultaneous docking of several ligands. The trick behind it is the formal assimilation of inter-molecular to intra-molecular DoF associated to putative inter-molecular contact axes. This is implemented within the genetic operators powering a Lamarckian Genetic Algorithm (GA). Further novelty includes differentiable interaction fingerprints to control population diversity, and fitting a simple continuum solvent model and favorable contact bonus terms to the AMBER/GAFF force field. Novel applications-docking of fragment-like compounds, simultaneous docking of multiple ligands, including free crystallographic waters-were published elsewhere. This paper discusses: (a) methodology, (b) set-up of the force field energy functions and (c) their validation in classical redocking tests. More than 80% success in redocking was achieved (RMSD of top-ranked pose < 2.0 Å).

  6. OFFICIAL EMBLEM - APOLLO-SOYUZ TEST PROJECT (ASTP)

    NASA Image and Video Library

    1974-03-01

    S74-17843 (March 1974) --- This is the official emblem of the Apollo-Soyuz Test Project chosen by NASA and the Soviet Academy of Sciences. The joint U.S.-USSR space mission is scheduled to be flown in July 1975. Of circular design, the emblem has the words Apollo in English and Soyuz in Russian around a center disc which depicts the two spacecraft docked together in Earth orbit. The Apollo-Soyuz Test Project will be carried out by a Soviet Soyuz spacecraft and a U.S. Apollo spacecraft which will rendezvous and dock in orbit. Soyuz and Apollo will remain docked for as long as two days in which period, the three Apollo astronauts will enter Soyuz and the two Soyuz cosmonauts will visit Apollo via a docking module. The Russian word "soyuz" means "union" in English.

  7. Designing Day Care: A Resource Manual for Development of Child Care Services.

    ERIC Educational Resources Information Center

    Jones, Jacquelyn O.

    Compiled to promote the development of high quality, affordable, and accessible day care programs in West Tennessee, this manual helps prospective child caregivers decide which kind of day care to operate and describes start-up steps and program operation. Section 1 focuses on five basic questions of potential caregivers: (1) Which type of child…

  8. Binding affinities of the farnesoid X receptor in the D3R Grand Challenge 2 estimated by free-energy perturbation and docking

    NASA Astrophysics Data System (ADS)

    Olsson, Martin A.; García-Sosa, Alfonso T.; Ryde, Ulf

    2018-01-01

    We have studied the binding of 102 ligands to the farnesoid X receptor within the D3R Grand Challenge 2016 blind-prediction competition. First, we employed docking with five different docking software and scoring functions. The selected docked poses gave an average root-mean-squared deviation of 4.2 Å. Consensus scoring gave decent results with a Kendall's τ of 0.26 ± 0.06 and a Spearman's ρ of 0.41 ± 0.08. For a subset of 33 ligands, we calculated relative binding free energies with free-energy perturbation. Five transformations between the ligands involved a change of the net charge and we implemented and benchmarked a semi-analytic correction (Rocklin et al., J Chem Phys 139:184103, 2013) for artifacts caused by the periodic boundary conditions and Ewald summation. The results gave a mean absolute deviation of 7.5 kJ/mol compared to the experimental estimates and a correlation coefficient of R 2 = 0.1. These results were among the four best in this competition out of 22 submissions. The charge corrections were significant (7-8 kJ/mol) and always improved the results. By employing 23 intermediate states in the free-energy perturbation, there was a proper overlap between all states and the precision was 0.1-0.7 kJ/mol. However, thermodynamic cycles indicate that the sampling was insufficient in some of the perturbations.

  9. MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP) - JSC

    NASA Image and Video Library

    1975-07-17

    S75-28682 (17 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during the joint U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit. The large television monitor shows a view of the Soyuz spacecraft as seen from the Apollo spacecraft during rendezvous and docking maneuvers. Eugene F. Kranz, JSC Deputy Director of Flight Operations, is standing in the foreground. M.P. Frank, the American senior ASTP flight director, is partially obscured on the right.

  10. Modulation of interaction of mutant TP53 and wild type BRCA1 by alkaloids: a computational approach towards targeting protein-protein interaction as a futuristic therapeutic intervention strategy for breast cancer impediment.

    PubMed

    Tiwari, Sameeksha; Awasthi, Manika; Singh, Swati; Pandey, Veda P; Dwivedi, Upendra N

    2017-10-23

    Protein-protein interactions (PPI) are a new emerging class of novel therapeutic targets. In order to probe these interactions, computational tools provide a convenient and quick method towards the development of therapeutics. Keeping this in view the present study was initiated to analyse interaction of tumour suppressor protein p53 (TP53) and breast cancer associated protein (BRCA1) as promising target against breast cancer. Using computational approaches such as protein-protein docking, hot spot analyses, molecular docking and molecular dynamics simulation (MDS), stepwise analyses of the interactions of the wild type and mutant TP53 with that of wild type BRCA1 and their modulation by alkaloids were done. Protein-protein docking method was used to generate both wild type and mutant complexes of TP53-BRCA1. Subsequently, the complexes were docked using sixteen different alkaloids, fulfilling ADMET and Lipinski's rule of five criteria, and were compared with that of a well-known inhibitor of PPI, namely nutlin. The alkaloid dicentrine was found to be the best docked alkaloid among all the docked alklaloids as well as that of nutlin. Furthermore, MDS analyses of both wild type and mutant complexes with the best docked alkaloid i.e. dicentrine, revealed higher stability of mutant complex than that of the wild one, in terms of average RMSD, RMSF and binding free energy, corroborating the results of docking. Results suggested more pronounced interaction of BRCA1 with mutant TP53 leading to increased expression of mutated TP53 thus showing a dominant negative gain of function and hampering wild type TP53 function leading to tumour progression.

  11. STS-114 Discovery's approach for docking

    NASA Image and Video Library

    2005-07-28

    ISS011-E-11233 (28 July 2005) --- One of a series of photographs showing the Space Shuttle Discovery as taken from aboard the International Space Station during rendezvous and docking operations. The Italian-built Raffaello Multi-Purpose Logistics Module (MPLM) is in the Shuttle’;s cargo bay. Earth, dotted with popcorn-like clouds, provides the backdrop for this image.

  12. Photocopy of drawing located at National Archives, Sand Bruno, California ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing located at National Archives, Sand Bruno, California (Navy # 110-A-1 2 of 5. Scofiled Construction Company Mare Island Office, Mare Island Cal. Plan of operating floor, September 2, 1908. - Mare Island Naval Shipyard, Pump House, California Avenue, east side between Dry Dock 1 & Dry Dock 2, near Ninth Street, Vallejo, Solano County, CA

  13. Dry dock gate stability modelling

    NASA Astrophysics Data System (ADS)

    Oktoberty; Widiyanto; Sasono, E. J.; Pramono, S.; Wandono, A. T.

    2018-03-01

    The development of marine transportation needs in Indonesia increasingly opens national shipyard business opportunities to provide shipbuilding services to the shipbuilding vessels. That emphasizes the stability of prime. The ship's decking door becomes an integral part of the efficient place and the specification of the use of the asset of its operational ease. This study aims to test the stability of Dry Dock gate with the length of 35.4 meters using Maxsurf and Hydromax in analyzing the calculation were in its assessment using interval per 500 mm length so that it can get detail data toward longitudinal and transverse such as studying Ship planning in general. The test result shows dry dock gate meets IMO standard with ballast construction containing 54% and 68% and using fix ballast can produce GMt 1,924 m, tide height 11,357m. The GMt value indicates dry dick gate can be stable and firmly erect at the base of the mouth dry dock. When empty ballast produces GMt 0.996 which means dry dock date is stable, but can easily be torn down. The condition can be used during dry dock gate treatment.

  14. New additions to the ClusPro server motivated by CAPRI.

    PubMed

    Vajda, Sandor; Yueh, Christine; Beglov, Dmitri; Bohnuud, Tanggis; Mottarella, Scott E; Xia, Bing; Hall, David R; Kozakov, Dima

    2017-03-01

    The heavily used protein-protein docking server ClusPro performs three computational steps as follows: (1) rigid body docking, (2) RMSD based clustering of the 1000 lowest energy structures, and (3) the removal of steric clashes by energy minimization. In response to challenges encountered in recent CAPRI targets, we added three new options to ClusPro. These are (1) accounting for small angle X-ray scattering data in docking; (2) considering pairwise interaction data as restraints; and (3) enabling discrimination between biological and crystallographic dimers. In addition, we have developed an extremely fast docking algorithm based on 5D rotational manifold FFT, and an algorithm for docking flexible peptides that include known sequence motifs. We feel that these developments will further improve the utility of ClusPro. However, CAPRI emphasized several shortcomings of the current server, including the problem of selecting the right energy parameters among the five options provided, and the problem of selecting the best models among the 10 generated for each parameter set. In addition, results convinced us that further development is needed for docking homology models. Finally, we discuss the difficulties we have encountered when attempting to develop a refinement algorithm that would be computationally efficient enough for inclusion in a heavily used server. Proteins 2017; 85:435-444. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  15. STS-106 Crew Activity Report / Flight Day Highlights Day 2

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-106 was launched on Sept 8, 2000 at 8:45 a.m. The crew was commanded by Terrence W. Wilcutt, the pilot was Scott D. Altman. The mission specialists were Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov. During the 11-day mission, the crew spent a week inside the International Space Station (ISS) unloading supplies from both a double SPACEHAB cargo module in the rear of the Atlantis cargo bay and from a Russian Progress M-1 resupply craft docked to the aft end of the Zvezda Service Module. The videotape shows the activities of the second day of the flight and the preparations for docking with the ISS. Shown on the video are shots of the flight deck on the shuttle, the shuttle payload arm, and shots of the crew eating lunch.

  16. Expedition 32 Docking with ISS

    NASA Image and Video Library

    2012-07-17

    Dina Pandya, Expedition 32 Flight Engineer Sunita Williams’ sister, says hello after her arrival to the International Space Station on Tuesday, July 17, 2012 at the Russian Mission Control Center in Korolev, Russia. The Soyuz docked to the International Space Station with Williams and fellow crew members Soyuz Commander Yuri Malenchenko and JAXA Flight Engineer Akihiko Hoshide two days after they launched from the Baikonur Cosmodrome in Kazakhstan. Photo Credit: (NASA/Carla Cioffi)

  17. MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP)

    NASA Image and Video Library

    1975-07-15

    S75-28519 (15 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center, Building 30, Johnson Space Center, on the first day of the Apollo-Soyuz Test Project docking mission in Earth orbit. This photograph was taken shortly before the American ASTP launch from the Kennedy Space Center. The television monitor in the center background shows the ASTP Apollo-Saturn 1B space vehicle on Pad B at KSC?s Launch Complex 39. The American ASTP liftoff followed the Soviet ASTP launch of the Soyuz space vehicle from Baikonur, Kazakhstan by seven and one-half hours.

  18. Issues and Design Drivers for Deep Space Habitats

    NASA Technical Reports Server (NTRS)

    Rucker, Michelle A.; Anderson, Molly

    2012-01-01

    A cross-disciplinary team of scientists and engineers applied expertise gained in Lunar Lander development to the conceptual design of a long-duration, deep space habitat for Near Earth Asteroid (NEA) missions. The design reference mission involved two launches to assemble 5-modules for a 380-day round trip mission carrying 4 crew members. The conceptual design process yielded a number of interesting debates, some of which could be significant design drivers in a detailed Deep Space Habitat (DSH) design. These issues included: Design to minimize crew radiation exposure, launch loads, communications challenges, docking system and hatch commonality, pointing and visibility, consumables, and design for contingency operations.

  19. Supervised autonomous rendezvous and docking system technology evaluation

    NASA Technical Reports Server (NTRS)

    Marzwell, Neville I.

    1991-01-01

    Technology for manned space flight is mature and has an extensive history of the use of man-in-the-loop rendezvous and docking, but there is no history of automated rendezvous and docking. Sensors exist that can operate in the space environment. The Shuttle radar can be used for ranges down to 30 meters, Japan and France are developing laser rangers, and considerable work is going on in the U.S. However, there is a need to validate a flight qualified sensor for the range of 30 meters to contact. The number of targets and illumination patterns should be minimized to reduce operation constraints with one or more sensors integrated into a robust system for autonomous operation. To achieve system redundancy, it is worthwhile to follow a parallel development of qualifying and extending the range of the 0-12 meter MSFC sensor and to simultaneously qualify the 0-30(+) meter JPL laser ranging system as an additional sensor with overlapping capabilities. Such an approach offers a redundant sensor suite for autonomous rendezvous and docking. The development should include the optimization of integrated sensory systems, packaging, mission envelopes, and computer image processing to mimic brain perception and real-time response. The benefits of the Global Positioning System in providing real-time positioning data of high accuracy must be incorporated into the design. The use of GPS-derived attitude data should be investigated further and validated.

  20. Nursing Leaders' Satisfaction with Information Systems in the Day-to-Day Operations Management in Hospital Units.

    PubMed

    Peltonen, Laura-Maria; Junttila, Kristiina; Salanterä, Sanna

    2018-01-01

    Information usage in the day-to-day operations management of hospital units is complex due to numerous information systems in use. The aim of this study was to describe and compare nurse leaders' satisfaction with information systems used in the day-to-day operations management in hospital units. The design was a cross-sectional survey with five questions rated from one (disagree) to five (fully agree). The response rate was 65 % (n = 453). Respondents reported fair satisfaction with how information systems support decision-making (median 4, IQR 3-4) and improve ease of access to information (median 4, IQR 3-4). However, respondents were less satisfied with how systems improve speed of access to information (median 3, IQR 3-4). Nor did respondents think that systems were developed for them (median 3, IQR 2-4). Respondents further reported needing numerous systems daily to support decision-making (median 4, IQR 3-5). A clear need for one system, which would gather important information for display was stated (median 5, IQR 4-5). Work experience, gender and time when overseeing the unit were associated with some aspects related to satisfaction. In conclusion, information system improvements are needed to better support the day-to-day operations management in hospital units.

  1. MSFC Three Point Docking Mechanism design review

    NASA Technical Reports Server (NTRS)

    Schaefer, Otto; Ambrosio, Anthony

    1992-01-01

    In the next few decades, we will be launching expensive satellites and space platforms that will require recovery for economic reasons, because of initial malfunction, servicing, repairs, or out of a concern for post lifetime debris removal. The planned availability of a Three Point Docking Mechanism (TPDM) is a positive step towards an operational satellite retrieval infrastructure. This study effort supports NASA/MSFC engineering work in developing an automated docking capability. The work was performed by the Grumman Space & Electronics Group as a concept evaluation/test for the Tumbling Satellite Retrieval Kit. Simulation of a TPDM capture was performed in Grumman's Large Amplitude Space Simulator (LASS) using mockups of both parts (the mechanism and payload). Similar TPDM simulation activities and more extensive hardware testing was performed at NASA/MSFC in the Flight Robotics Laboratory and Space Station/Space Operations Mechanism Test Bed (6-DOF Facility).

  2. Why are most EU pigs tail docked? Economic and ethical analysis of four pig housing and management scenarios in the light of EU legislation and animal welfare outcomes.

    PubMed

    D'Eath, R B; Niemi, J K; Vosough Ahmadi, B; Rutherford, K M D; Ison, S H; Turner, S P; Anker, H T; Jensen, T; Busch, M E; Jensen, K K; Lawrence, A B; Sandøe, P

    2016-04-01

    To limit tail biting incidence, most pig producers in Europe tail dock their piglets. This is despite EU Council Directive 2008/120/EC banning routine tail docking and allowing it only as a last resort. The paper aims to understand what it takes to fulfil the intentions of the Directive by examining economic results of four management and housing scenarios, and by discussing their consequences for animal welfare in the light of legal and ethical considerations. The four scenarios compared are: 'Standard Docked', a conventional housing scenario with tail docking meeting the recommendations for Danish production (0.7 m2/pig); 'Standard Undocked', which is the same as 'Standard Docked' but with no tail docking, 'Efficient Undocked' and 'Enhanced Undocked', which have increased solid floor area (0.9 and 1.0 m2/pig, respectively) provision of loose manipulable materials (100 and 200 g/straw per pig per day) and no tail docking. A decision tree model based on data from Danish and Finnish pig production suggests that Standard Docked provides the highest economic gross margin with the least tail biting. Given our assumptions, Enhanced Undocked is the least economic, although Efficient Undocked is better economically and both result in a lower incidence of tail biting than Standard Undocked but higher than Standard Docked. For a pig, being bitten is worse for welfare (repeated pain, risk of infections) than being docked, but to compare welfare consequences at a farm level means considering the number of affected pigs. Because of the high levels of biting in Standard Undocked, it has on average inferior welfare to Standard Docked, whereas the comparison of Standard Docked and Enhanced (or Efficient) Undocked is more difficult. In Enhanced (or Efficient) Undocked, more pigs than in Standard Docked suffer from being tail bitten, whereas all the pigs avoid the acute pain of docking endured by the pigs in Standard Docked. We illustrate and discuss this ethical balance using numbers derived from the above-mentioned data. We discuss our results in the light of the EU Directive and its adoption and enforcement by Member States. Widespread use of tail docking seems to be accepted, mainly because the alternative steps that producers are required to take before resorting to it are not specified in detail. By tail docking, producers are acting in their own best interests. We suggest that for the practice of tail docking to be terminated in a way that benefits animal welfare, changes in the way pigs are housed and managed may first be required.

  3. CDOCKER and lambda λ -dynamics for prospective prediction in D3R Grand Challenge 2

    NASA Astrophysics Data System (ADS)

    Ding, Xinqiang; Hayes, Ryan L.; Vilseck, Jonah Z.; Charles, Murchtricia K.; Brooks, Charles L.

    2018-01-01

    The opportunity to prospectively predict ligand bound poses and free energies of binding to the Farnesoid X Receptor in the D3R Grand Challenge 2 provided a useful exercise to evaluate CHARMM based docking (CDOCKER) and λ-dynamics methodologies for use in "real-world" applications in computer aided drug design. In addition to measuring their current performance, several recent methodological developments have been analyzed retrospectively to highlight best procedural practices in future applications. For pose prediction with CDOCKER, when the protein structure used for rigid receptor docking was close to the crystallographic holo structure, reliable poses were obtained. Benzimidazoles, with a known holo receptor structure, were successfully docked with an average RMSD of 0.97 Å. Other non-benzimidazole ligands displayed less accuracy largely because the receptor structures we chose for docking were too different from the experimental holo structures. However, retrospective analysis has shown that when these ligands were re-docked into their holo structures, the average RMSD dropped to 1.18 Å for all ligands. When sulfonamides and spiros were docked with the apo structure, which agrees more with their holo structure than the structures we chose, five out of six ligands were correctly docked. These docking results emphasize the need for flexible receptor docking approaches. For λ-dynamics techniques, including multisite λ-dynamics (MSλD), reasonable agreement with experiment was observed for the 33 ligands investigated; root mean square errors of 2.08 and 1.67 kcal/mol were obtained for free energy sets 1 and 2, respectively. Retrospectively, soft-core potentials, adaptive landscape flattening, and biasing potential replica exchange (BP-REX) algorithms were critical to model large substituent perturbations with sufficient precision and within restrictive timeframes, such as was required with participation in Grand Challenge 2. These developments, their associated benefits, and proposed procedures for their use in future applications are discussed.

  4. CDOCKER and λ-dynamics for prospective prediction in D₃R Grand Challenge 2.

    PubMed

    Ding, Xinqiang; Hayes, Ryan L; Vilseck, Jonah Z; Charles, Murchtricia K; Brooks, Charles L

    2018-01-01

    The opportunity to prospectively predict ligand bound poses and free energies of binding to the Farnesoid X Receptor in the D3R Grand Challenge 2 provided a useful exercise to evaluate CHARMM based docking (CDOCKER) and [Formula: see text]-dynamics methodologies for use in "real-world" applications in computer aided drug design. In addition to measuring their current performance, several recent methodological developments have been analyzed retrospectively to highlight best procedural practices in future applications. For pose prediction with CDOCKER, when the protein structure used for rigid receptor docking was close to the crystallographic holo structure, reliable poses were obtained. Benzimidazoles, with a known holo receptor structure, were successfully docked with an average RMSD of 0.97 [Formula: see text]. Other non-benzimidazole ligands displayed less accuracy largely because the receptor structures we chose for docking were too different from the experimental holo structures. However, retrospective analysis has shown that when these ligands were re-docked into their holo structures, the average RMSD dropped to 1.18 [Formula: see text] for all ligands. When sulfonamides and spiros were docked with the apo structure, which agrees more with their holo structure than the structures we chose, five out of six ligands were correctly docked. These docking results emphasize the need for flexible receptor docking approaches. For [Formula: see text]-dynamics techniques, including multisite [Formula: see text]-dynamics (MS[Formula: see text]D), reasonable agreement with experiment was observed for the 33 ligands investigated; root mean square errors of 2.08 and 1.67 kcal/mol were obtained for free energy sets 1 and 2, respectively. Retrospectively, soft-core potentials, adaptive landscape flattening, and biasing potential replica exchange (BP-REX) algorithms were critical to model large substituent perturbations with sufficient precision and within restrictive timeframes, such as was required with participation in Grand Challenge 2. These developments, their associated benefits, and proposed procedures for their use in future applications are discussed.

  5. Preliminary GN&C Design for the On-Orbit Autonomous Assembly of Nanosatellite Demonstration Mission

    NASA Technical Reports Server (NTRS)

    Pei, Jing; Walsh, Matt; Roithmayr, Carlos; Karlgaard, Chris; Peck, Mason; Murchison, Luke

    2017-01-01

    Small spacecraft autonomous rendezvous and docking (ARD) is an essential technology for future space structure assembly missions. The On-orbit Autonomous Assembly of Nanosatellites (OAAN) team at NASA Langley Research Center (LaRC) intends to demonstrate the technology to autonomously dock two nanosatellites to form an integrated system. The team has developed a novel magnetic capture and latching mechanism that allows for docking of two CubeSats without precise sensors and actuators. The proposed magnetic docking hardware not only provides the means to latch the CubeSats, but it also significantly increases the likelihood of successful docking in the presence of relative attitude and position errors. The simplicity of the design allows it to be implemented on many CubeSat rendezvous missions. Prior to demonstrating the docking subsystem capabilities on orbit, the GN&C subsystem should have a robust design such that it is capable of bringing the CubeSats from an arbitrary initial separation distance of as many as a few thousand kilometers down to a few meters. The main OAAN Mission can be separated into the following phases: 1) Launch, checkout, and drift, 2) Far-Field Rendezvous or Drift Recovery, 3) Proximity Operations, 4) Docking. This paper discusses the preliminary GN&C design and simulation results for each phase of the mission.

  6. 27. HULETT ORE UNLOADERS TEMPORARILY IN REPOSE, AS A NEW ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. HULETT ORE UNLOADERS TEMPORARILY IN REPOSE, AS A NEW SKIP TIES UP AT DOCK. THE UNLOADERS OPERATE ALMOST CONTINUOUSLY DURING THE SHIPPING SEASON, WHICH USUALLY RUNS FROM APRIL UNTIL LATE DECEMBER OR EARLY JANUARY. VIEW HERE IS LOOKING NORTHEAST. - Pennsylvania Railway Ore Dock, Lake Erie at Whiskey Island, approximately 1.5 miles west of Public Square, Cleveland, Cuyahoga County, OH

  7. Docking simulation analysis of range data requirements for the orbital maneuvering vehicle

    NASA Technical Reports Server (NTRS)

    Micheal, J. D.; Vinz, F. L.

    1985-01-01

    The results of an initial study are reported assess the controllability of the Orbital Maneuvering Vehicle (OMV) for terminal closure and docking are reported. The vehicle characteristics used in this study are those of the Marshall Space Flight Center (MSFC) baseline OMV which were published with the request for proposals for preliminary design of this vehicle. This simulation was conducted at MSFC using the Target Motion Simulator. The study focused on the OMV manual mode capability to accommodate both stabilized and tumbling target engagements with varying complements of range and range rate data displayed to the OMV operator. Four trained test subjects performed over 400 simulated orbital dockings during this study. A firm requirement for radar during the terminal closure and dock phase of the OMV mission was not established by these simulations. Fifteen pound thrusters recommended in the MSFC baseline design were found to be advantageous for initial rate matching maneuvers with unstabilized targets; however, lower thrust levels were desirable for making the final docking maneuvers.

  8. Advanced Docking System With Magnetic Initial Capture

    NASA Technical Reports Server (NTRS)

    Lewis, James L.; Carroll, Monty B.; Morales, Ray; Le, Thang

    2004-01-01

    An advanced docking system is undergoing development to enable softer, safer docking than was possible when using prior docking systems. This system is intended for original use in docking of visiting spacecraft and berthing the Crew Return Vehicle at the International Space Station (ISS). The system could also be adapted to a variety of other uses in outer space and on Earth, including mating submersible vehicles, assembling structures, and robotic berthing/handling of payloads and cargo. Heretofore, two large spacecraft have been docked by causing the spacecraft to approach each other at a speed sufficient to activate capture latches - a procedure that results in large docking loads and is made more difficult because of the speed. The basic design and mode of operation of the present advanced docking system would eliminate the need to rely on speed of approach to activate capture latches, thereby making it possible to reduce approach speed and thus docking loads substantially. The system would comprise an active subsystem on one spacecraft and a passive subsystem on another spacecraft with which the active subsystem will be docked. The passive subsystem would include an extensible ring containing magnetic striker plates and guide petals. The active subsystem would include mating guide petals and electromagnets containing limit switches and would be arranged to mate with the magnetic striker plates and guide petals of the passive assembly. The electromagnets would be carried on (but not rigidly attached to) a structural ring that would be instrumented with load sensors. The outputs of the sensors would be sent, along with position information, as feedback to an electronic control subsystem. The system would also include electromechanical actuators that would extend or retract the ring upon command by the control subsystem.

  9. Expedition 31 Soyuz TMA-04M Docking to ISS

    NASA Image and Video Library

    2012-05-17

    The family of Expedition 31 Flight Engineer Joe Acaba sings happy birthday to him from the Russian Mission Control Center in Korolev, Russia, Thursday, May 17, 2012. Acaba, Expedition 31 Soyuz Commander Gennady Padalka, and Flight Engineer Sergei Revin, docked their Soyuz TMA-04M spacecraft to the space station at 8:36 a.m. Moscow time, two days after they launched from the Baikonur Cosmodrome in Kazakhstan. Photo Credit: (NASA/Bill Ingalls)

  10. STS-89 M.S. Andrew Thomas, poses the day before launch

    NASA Technical Reports Server (NTRS)

    1998-01-01

    STS-89 Mission Specialist Andrew Thomas, Ph.D., poses at KSC's Launch Pad 39A wearing a miniature koala bear on the day before the scheduled launch of Space Shuttle Endeavour that will carry him up to the Russian Space Station Mir. Final preparations are under way toward liftoff on Jan. 22 on the eighth mission to dock with Mir. After docking, Dr. Thomas will transfer to the space station, succeeding David Wolf, M.D., who will return to Earth aboard Endeavour. Dr. Thomas, who was born and educated in South Australia, will live and work on Mir until June. STS-89 is scheduled for liftoff at 9:48 p.m. EST.

  11. Do Clinical Results and Return-to-Sport Rates After Ulnar Collateral Ligament Reconstruction Differ Based on Graft Choice and Surgical Technique?

    PubMed Central

    Erickson, Brandon J.; Cvetanovich, Gregory L.; Frank, Rachel M.; Bach, Bernard R.; Cohen, Mark S.; Bush-Joseph, Charles A.; Cole, Brian J.; Romeo, Anthony A.

    2016-01-01

    Background: Ulnar collateral ligament reconstruction (UCLR) has become a common procedure performed in overhead-throwing athletes of many athletic levels. Purpose/Hypothesis: The purpose of this study was to determine whether clinical outcomes and return-to-sport (RTS) rates differ among patients undergoing UCLR based on graft choice, surgical technique, athletic competition level, handedness, and treatment of the ulnar nerve. We hypothesized that no differences would exist in clinical outcomes or RTS rates between technique, graft choice, or other variables. Study Design: Cohort study; Level of evidence, 3. Methods: All patients who underwent UCLR from January 1, 2004 through December 31, 2014 at a single institution were identified. Charts were reviewed to determine patient age, sex, date of surgery, sport played, handedness, athletic level, surgical technique, graft type, and complications. Patients were contacted via telephone to obtain the RTS rate, Conway-Jobe score, Timmerman-Andrews score, and Kerlan-Jobe Orthopaedic Clinic (KJOC) Shoulder and Elbow score. Results: Eighty-five patients (mean age at surgery, 19.3 ± 4.7 years; 92% male; 78% right hand–dominant) underwent UCLR between 2004 and 2014 and were available for follow-up. Overall, 87% were baseball pitchers, 49.4% were college athletes, and 41.2% were high school athletes. No significant difference existed between the docking and double-docking techniques, graft choice, handedness, sex, activity level, and treatment of the ulnar nerve with regard to clinical outcomes, RTS, or subsequent surgeries (all P > .05). More complications were seen in the docking technique compared with the double-docking technique (P = .036). Hamstring autograft was used more commonly with the docking technique (P = .023) while allograft was used more commonly with the double-docking technique (P = .0006). Conclusion: Both the docking and double-docking techniques produce excellent clinical outcomes in patients undergoing UCLR. No difference in outcome scores was seen between surgical technique or graft type. The double-docking technique had fewer complications than the docking technique. PMID:27896290

  12. Sulfonanilide Derivatives in Identifying Novel Aromatase Inhibitors by Applying Docking, Virtual Screening, and MD Simulations Studies

    PubMed Central

    Son, Minky; Park, Chanin; Kim, Hyong-Ha; Suh, Jung-Keun

    2017-01-01

    Breast cancer is one of the leading causes of death noticed in women across the world. Of late the most successful treatments rendered are the use of aromatase inhibitors (AIs). In the current study, a two-way approach for the identification of novel leads has been adapted. 81 chemical compounds were assessed to understand their potentiality against aromatase along with the four known drugs. Docking was performed employing the CDOCKER protocol available on the Discovery Studio (DS v4.5). Exemestane has displayed a higher dock score among the known drug candidates and is labeled as reference. Out of 81 ligands 14 have exhibited higher dock scores than the reference. In the second approach, these 14 compounds were utilized for the generation of the pharmacophore. The validated four-featured pharmacophore was then allowed to screen Chembridge database and the potential Hits were obtained after subjecting them to Lipinski's rule of five and the ADMET properties. Subsequently, the acquired 3,050 Hits were escalated to molecular docking utilizing GOLD v5.0. Finally, the obtained Hits were consequently represented to be ideal lead candidates that were escalated to the MD simulations and binding free energy calculations. Additionally, the gene-disease association was performed to delineate the associated disease caused by CYP19A1. PMID:29312992

  13. Sulfonanilide Derivatives in Identifying Novel Aromatase Inhibitors by Applying Docking, Virtual Screening, and MD Simulations Studies.

    PubMed

    Rampogu, Shailima; Son, Minky; Park, Chanin; Kim, Hyong-Ha; Suh, Jung-Keun; Lee, Keun Woo

    2017-01-01

    Breast cancer is one of the leading causes of death noticed in women across the world. Of late the most successful treatments rendered are the use of aromatase inhibitors (AIs). In the current study, a two-way approach for the identification of novel leads has been adapted. 81 chemical compounds were assessed to understand their potentiality against aromatase along with the four known drugs. Docking was performed employing the CDOCKER protocol available on the Discovery Studio (DS v4.5). Exemestane has displayed a higher dock score among the known drug candidates and is labeled as reference. Out of 81 ligands 14 have exhibited higher dock scores than the reference. In the second approach, these 14 compounds were utilized for the generation of the pharmacophore. The validated four-featured pharmacophore was then allowed to screen Chembridge database and the potential Hits were obtained after subjecting them to Lipinski's rule of five and the ADMET properties. Subsequently, the acquired 3,050 Hits were escalated to molecular docking utilizing GOLD v5.0. Finally, the obtained Hits were consequently represented to be ideal lead candidates that were escalated to the MD simulations and binding free energy calculations. Additionally, the gene-disease association was performed to delineate the associated disease caused by CYP19A1.

  14. [Anti-tumor target prediction and activity verification of Ganoderma lucidum triterpenoids].

    PubMed

    Du, Guo-Hua; Wang, Hong-Xu; Yan, Zheng; Liu, Li-Ying; Chen, Ruo-Yun

    2017-02-01

    It has reported that Ganoderma lucidum triterpenoids had anti-tumor activity. However, the anti-tumor target is still unclear. The present study was designed to investigate the anti-tumor activity of G. lucidum triterpenoids on different tumor cells, and predict their potential targets by virtual screening. In this experiment, molecular docking was used to simulate the interactions of 26 triterpenoids isolated from G. lucidum and 11 target proteins by LibDock module of Discovery Studio2016 software, then the anti-tumor targets of triterpenoids were predicted. In addition, the in vitro anti-tumor effects of triterpenoids were evaluated by MTT assay by determining the inhibition of proliferation in 5 tumor cell lines. The docking results showed that the poses were greater than five, and Libdock Scores higher than 100, which can be used to determine whether compounds were activity. Eight triterpenoids might have anti-tumor activity as a result of good docking, five of which had multiple targets. MTT experiments demonstrated that the ganoderic acid Y had a certain inhibitory activity on lung cancer cell H460, with IC₅₀ of 22.4 μmol•L ⁻¹, followed by 7-oxo-ganoderic acid Z2, with IC₅₀ of 43.1 μmol•L ⁻¹. However, the other triterpenoids had no anti-tumor activity in the detected tumor cell lines. Taking together, molecular docking approach established here can be used for preliminary screening of anti-tumor activity of G.lucidum ingredients. Through this screening method, combined with the MTT assay, we can conclude that ganoderic acid Y had antitumor activity, especially anti-lung cancer, and 7-oxo-ganoderic acid Z2 as well as ganoderon B, to a certain extent, had anti-tumor activity. These findings can provide basis for the development of anti-tumor drugs. However, the anti-tumor mechanisms need to be further studied. Copyright© by the Chinese Pharmaceutical Association.

  15. The simulation study of protein-protein interfaces based on the 4-helix bundle structure

    NASA Astrophysics Data System (ADS)

    Fukuda, Masaki; Komatsu, Yu; Morikawa, Ryota; Miyakawa, Takeshi; Takasu, Masako; Akanuma, Satoshi; Yamagishi, Akihiko

    2013-02-01

    Docking of two protein molecules is induced by intermolecular interactions. Our purposes in this study are: designing binding interfaces on the two proteins, which specifically interact to each other; and inducing intermolecular interactions between the two proteins by mixing them. A 4-helix bundle structure was chosen as a scaffold on which binding interfaces were created. Based on this scaffold, we designed binding interfaces involving charged and nonpolar amino acid residues. We performed molecular dynamics (MD) simulation to identify suitable amino acid residues for the interfaces. We chose YciF protein as the scaffold for the protein-protein docking simulation. We observed the structure of two YciF protein molecules (I and II), and we calculated the distance between centroids (center of gravity) of the interfaces' surface planes of the molecules I and II. We found that the docking of the two protein molecules can be controlled by the number of hydrophobic and charged amino acid residues involved in the interfaces. Existence of six hydrophobic and five charged amino acid residues within an interface were most suitable for the protein-protein docking.

  16. Autonomous docking ground demonstration (category 3)

    NASA Technical Reports Server (NTRS)

    Lamkin, Steve L.; Eick, Richard E.; Baxter, James M.; Boyd, M. G.; Clark, Fred D.; Lee, Thomas Q.; Othon, L. T.; Prather, Joseph L.; Spehar, Peter T.; Teders, Rebecca J.

    1991-01-01

    The NASA Johnson Space Center (JSC) is involved in the development of an autonomous docking ground demonstration. The demonstration combines the technologies, expertise and facilities of the JSC Tracking and Communications Division (EE), Structures and Mechanics Division (ES), and the Navigation, Guidance and Control Division (EG) and their supporting contractors. The autonomous docking ground demonstration is an evaluation of the capabilities of the laser sensor system to support the docking phase (12ft to contact) when operated in conjunction with the Guidance, Navigation and Control Software. The docking mechanism being used was developed for the Apollo Soyuz Test Program. This demonstration will be conducted using the Six-Degrees of Freedom (6-DOF) Dynamic Test System (DTS). The DTS environment simulates the Space Station Freedom as the stationary or target vehicle and the Orbiter as the active or chase vehicle. For this demonstration the laser sensor will be mounted on the target vehicle and the retroreflectors on the chase vehicle. This arrangement was used to prevent potential damage to the laser. The sensor system. GN&C and 6-DOF DTS will be operated closed-loop. Initial condition to simulate vehicle misalignments, translational and rotational, will be introduced within the constraints of the systems involved. Detailed description of each of the demonstration components (e.g., Sensor System, GN&C, 6-DOF DTS and supporting computer configuration) including their capabilities and limitations will be discussed. A demonstration architecture drawing and photographs of the test configuration will be presented.

  17. Autonomous docking ground demonstration (category 3)

    NASA Astrophysics Data System (ADS)

    Lamkin, Steve L.; Eick, Richard E.; Baxter, James M.; Boyd, M. G.; Clark, Fred D.; Lee, Thomas Q.; Othon, L. T.; Prather, Joseph L.; Spehar, Peter T.; Teders, Rebecca J.

    The NASA Johnson Space Center (JSC) is involved in the development of an autonomous docking ground demonstration. The demonstration combines the technologies, expertise and facilities of the JSC Tracking and Communications Division (EE), Structures and Mechanics Division (ES), and the Navigation, Guidance and Control Division (EG) and their supporting contractors. The autonomous docking ground demonstration is an evaluation of the capabilities of the laser sensor system to support the docking phase (12ft to contact) when operated in conjunction with the Guidance, Navigation and Control Software. The docking mechanism being used was developed for the Apollo Soyuz Test Program. This demonstration will be conducted using the Six-Degrees of Freedom (6-DOF) Dynamic Test System (DTS). The DTS environment simulates the Space Station Freedom as the stationary or target vehicle and the Orbiter as the active or chase vehicle. For this demonstration the laser sensor will be mounted on the target vehicle and the retroreflectors on the chase vehicle. This arrangement was used to prevent potential damage to the laser. The sensor system. GN&C and 6-DOF DTS will be operated closed-loop. Initial condition to simulate vehicle misalignments, translational and rotational, will be introduced within the constraints of the systems involved. Detailed description of each of the demonstration components (e.g., Sensor System, GN&C, 6-DOF DTS and supporting computer configuration) including their capabilities and limitations will be discussed. A demonstration architecture drawing and photographs of the test configuration will be presented.

  18. FDA approved drugs complexed to their targets: evaluating pose prediction accuracy of docking protocols.

    PubMed

    Bohari, Mohammed H; Sastry, G Narahari

    2012-09-01

    Efficient drug discovery programs can be designed by utilizing existing pools of knowledge from the already approved drugs. This can be achieved in one way by repositioning of drugs approved for some indications to newer indications. Complex of drug to its target gives fundamental insight into molecular recognition and a clear understanding of putative binding site. Five popular docking protocols, Glide, Gold, FlexX, Cdocker and LigandFit have been evaluated on a dataset of 199 FDA approved drug-target complexes for their accuracy in predicting the experimental pose. Performance for all the protocols is assessed at default settings, with root mean square deviation (RMSD) between the experimental ligand pose and the docked pose of less than 2.0 Å as the success criteria in predicting the pose. Glide (38.7 %) is found to be the most accurate in top ranked pose and Cdocker (58.8 %) in top RMSD pose. Ligand flexibility is a major bottleneck in failure of docking protocols to correctly predict the pose. Resolution of the crystal structure shows an inverse relationship with the performance of docking protocol. All the protocols perform optimally when a balanced type of hydrophilic and hydrophobic interaction or dominant hydrophilic interaction exists. Overall in 16 different target classes, hydrophobic interactions dominate in the binding site and maximum success is achieved for all the docking protocols in nuclear hormone receptor class while performance for the rest of the classes varied based on individual protocol.

  19. Rapid computational identification of the targets of protein kinase inhibitors.

    PubMed

    Rockey, William M; Elcock, Adrian H

    2005-06-16

    We describe a method for rapidly computing the relative affinities of an inhibitor for all individual members of a family of homologous receptors. The approach, implemented in a new program, SCR, models inhibitor-receptor interactions in full atomic detail with an empirical energy function and includes an explicit account of flexibility in homology-modeled receptors through sampling of libraries of side chain rotamers. SCR's general utility was demonstrated by application to seven different protein kinase inhibitors: for each inhibitor, relative binding affinities with panels of approximately 20 protein kinases were computed and compared with experimental data. For five of the inhibitors (SB203580, purvalanol B, imatinib, H89, and hymenialdisine), SCR provided excellent reproduction of the experimental trends and, importantly, was capable of identifying the targets of inhibitors even when they belonged to different kinase families. The method's performance in a predictive setting was demonstrated by performing separate training and testing applications, and its key assumptions were tested by comparison with a number of alternative approaches employing the ligand-docking program AutoDock (Morris et al. J. Comput. Chem. 1998, 19, 1639-1662). These comparison tests included using AutoDock in nondocking and docking modes and performing energy minimizations of inhibitor-kinase complexes with the molecular mechanics code GROMACS (Berendsen et al. Comput. Phys. Commun. 1995, 91, 43-56). It was found that a surprisingly important aspect of SCR's approach is its assumption that the inhibitor be modeled in the same orientation for each kinase: although this assumption is in some respects unrealistic, calculations that used apparently more realistic approaches produced clearly inferior results. Finally, as a large-scale application of the method, SB203580, purvalanol B, and imatinib were screened against an almost full complement of 493 human protein kinases using SCR in order to identify potential new targets; the predicted targets of SB203580 were compared with those identified in recent proteomics-based experiments. These kinome-wide screens, performed within a day on a small cluster of PCs, indicate that explicit computation of inhibitor-receptor binding affinities has the potential to promote rapid discovery of new therapeutic targets for existing inhibitors.

  20. Expedition 32 Docking with ISS

    NASA Image and Video Library

    2012-07-17

    Expedition 32 Flight Engineer Sunita Williams’ sister and friend brought a photo of William’s dog “Gorby” in support of her arrival to the International Space Station on Tuesday, July 17, 2012 at the Russian Mission Control Center in Korolev, Russia. The Soyuz docked to the International Space Station with Williams and fellow crew members Soyuz Commander Yuri Malenchenko and JAXA Flight Engineer Akihiko Hoshide two days after they launched from the Baikonur Cosmodrome in Kazakhstan. Photo Credit: (NASA/Carla Cioffi)

  1. STS-71, Space Shuttle Mission Report

    NASA Technical Reports Server (NTRS)

    Frike, Robert W., Jr.

    1995-01-01

    The STS-71 Space Shuttle Program Mission Report summarizes the Payload activities and provides detailed data on the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Reusable Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance. STS-71 is the 100th United States manned space flight, the sixty-ninth Space Shuttle flight, the forty-fourth flight since the return-to-flight, the fourteenth flight of the OV-104 Orbiter vehicle Atlantis, and the first joint United States (U.S.)-Russian docking mission since 1975. In addition to the OV-104 Orbiter vehicle, the flight vehicle consisted of an ET that was designated ET-70; three SSMEs that were designated 2028, 2034, and 2032 in positions 1, 2, and 3, respectively; and two SRBs that were designated Bl-072. The RSRMs that were an integral part of the SRBs were designated 360L045A for the left SRB and 360W045B for the right SRB. The STS-71 mission was planned as a 1 0-day plus 1-day-extension mission plus 2 additional days for contingency operations and weather avoidance. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and perform on-orbit joint U.S.-Russian life sciences investigations, logistical resupply of the Mir Space Station, return of the United States astronaut flying on the Mir, the replacement of the Mir-18 crew with the two-cosmonaut Mir-19 crew, and the return of the Mir-18 crew to Earth. The secondary objectives were to perform the requirements of the IMAX Camera and the Shuttle Amateur Radio experiment-2 (SAREX-2).

  2. Automated space vehicle control for rendezvous proximity operations

    NASA Technical Reports Server (NTRS)

    Lea, Robert N.

    1988-01-01

    Rendezvous during the unmanned space exploration missions, such as a Mars Rover/Sample Return will require a completely automatic system from liftoff to docking. A conceptual design of an automated rendezvous, proximity operations, and docking system is being implemented and validated at the Johnson Space Center (JSC). The emphasis is on the progress of the development and testing of a prototype system for control of the rendezvous vehicle during proximity operations that is currently being developed at JSC. Fuzzy sets are used to model the human capability of common sense reasoning in decision making tasks and such models are integrated with the expert systems and engineering control system technology to create a system that performs comparably to a manned system.

  3. Automated space vehicle control for rendezvous proximity operations

    NASA Technical Reports Server (NTRS)

    Lea, Robert N.

    1988-01-01

    Rendezvous during the unmanned space exploration missions, such as a Mars Rover/Sample Return will require a completely automatic system from liftoff to docking. A conceptual design of an automated rendezvous, proximity operations, and docking system is being implemented and validated at the Johnson Space Center (JSC). The emphasis is on the progress of the development and testing of a prototype system for control of the rendezvous vehicle during proximity operations that is currently being developed at JSC. Fuzzy sets are used to model the human capability of common sense reasoning in decision-making tasks and such models are integrated with the expert systems and engineering control system technology to create a system that performs comparably to a manned system.

  4. Rapid activity prediction of HIV-1 integrase inhibitors: harnessing docking energetic components for empirical scoring by chemometric and artificial neural network approaches

    NASA Astrophysics Data System (ADS)

    Thangsunan, Patcharapong; Kittiwachana, Sila; Meepowpan, Puttinan; Kungwan, Nawee; Prangkio, Panchika; Hannongbua, Supa; Suree, Nuttee

    2016-06-01

    Improving performance of scoring functions for drug docking simulations is a challenging task in the modern discovery pipeline. Among various ways to enhance the efficiency of scoring function, tuning of energetic component approach is an attractive option that provides better predictions. Herein we present the first development of rapid and simple tuning models for predicting and scoring inhibitory activity of investigated ligands docked into catalytic core domain structures of HIV-1 integrase (IN) enzyme. We developed the models using all energetic terms obtained from flexible ligand-rigid receptor dockings by AutoDock4, followed by a data analysis using either partial least squares (PLS) or self-organizing maps (SOMs). The models were established using 66 and 64 ligands of mercaptobenzenesulfonamides for the PLS-based and the SOMs-based inhibitory activity predictions, respectively. The models were then evaluated for their predictability quality using closely related test compounds, as well as five different unrelated inhibitor test sets. Weighting constants for each energy term were also optimized, thus customizing the scoring function for this specific target protein. Root-mean-square error (RMSE) values between the predicted and the experimental inhibitory activities were determined to be <1 (i.e. within a magnitude of a single log scale of actual IC50 values). Hence, we propose that, as a pre-functional assay screening step, AutoDock4 docking in combination with these subsequent rapid weighted energy tuning methods via PLS and SOMs analyses is a viable approach to predict the potential inhibitory activity and to discriminate among small drug-like molecules to target a specific protein of interest.

  5. Optoelectronic Sensor System for Guidance in Docking

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.; Book, Michael L.; Jackson, John L.

    2004-01-01

    The Video Guidance Sensor (VGS) system is an optoelectronic sensor that provides automated guidance between two vehicles. In the original intended application, the two vehicles would be spacecraft docking together, but the basic principles of design and operation of the sensor are applicable to aircraft, robots, vehicles, or other objects that may be required to be aligned for docking, assembly, resupply, or precise separation. The system includes a sensor head containing a monochrome charge-coupled- device video camera and pulsed laser diodes mounted on the tracking vehicle, and passive reflective targets on the tracked vehicle. The lasers illuminate the targets, and the resulting video images of the targets are digitized. Then, from the positions of the digitized target images and known geometric relationships among the targets, the relative position and orientation of the vehicles are computed. As described thus far, the VGS system is based on the same principles as those of the system described in "Improved Video Sensor System for Guidance in Docking" (MFS-31150), NASA Tech Briefs, Vol. 21, No. 4 (April 1997), page 9a. However, the two systems differ in the details of design and operation. The VGS system is designed to operate with the target completely visible within a relative-azimuth range of +/-10.5deg and a relative-elevation range of +/-8deg. The VGS acquires and tracks the target within that field of view at any distance from 1.0 to 110 m and at any relative roll, pitch, and/or yaw angle within +/-10deg. The VGS produces sets of distance and relative-orientation data at a repetition rate of 5 Hz. The software of this system also accommodates the simultaneous operation of two sensors for redundancy

  6. Measurement of performance using acceleration control and pulse control in simulated spacecraft docking operations

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.; Ellis, Stephen R.

    1992-01-01

    Nine commercial airline pilots served as test subjects in a study to compare acceleration control with pulse control in simulated spacecraft maneuvers. Simulated remote dockings of an orbital maneuvering vehicle (OMV) to a space station were initiated from 50, 100, and 150 meters along the station's -V-bar (minus velocity vector). All unsuccessful missions were reflown. Five way mixed analysis of variance (ANOVA) with one between factor, first mode, and four within factors (mode, bloch, range, and trial) were performed on the data. Recorded performance measures included mission duration and fuel consumption along each of the three coordinate axes. Mission duration was lower with pulse mode, while delta V (fuel consumption) was lower with acceleration mode. Subjects used more fuel to travel faster with pulse mode than with acceleration mode. Mission duration, delta V, X delta V, Y delta V., and Z delta V all increased with range. Subjects commanded the OMV to 'fly' at faster rates from further distances. These higher average velocities were paid for with increased fuel consumption. Asymmetrical transfer was found in that the mode transitions could not be predicted solely from the mission duration main effect. More testing is advised to understand the manual control aspects of spaceflight maneuvers better.

  7. Virtual screening of B-Raf kinase inhibitors: A combination of pharmacophore modelling, molecular docking, 3D-QSAR model and binding free energy calculation studies.

    PubMed

    Zhang, Wen; Qiu, Kai-Xiong; Yu, Fang; Xie, Xiao-Guang; Zhang, Shu-Qun; Chen, Ya-Juan; Xie, Hui-Ding

    2017-10-01

    B-Raf kinase has been identified as an important target in recent cancer treatment. In order to discover structurally diverse and novel B-Raf inhibitors (BRIs), a virtual screening of BRIs against ZINC database was performed by using a combination of pharmacophore modelling, molecular docking, 3D-QSAR model and binding free energy (ΔG bind ) calculation studies in this work. After the virtual screening, six promising hit compounds were obtained, which were then tested for inhibitory activities of A375 cell lines. In the result, five hit compounds show good biological activities (IC 50 <50μM). The present method of virtual screening can be applied to find structurally diverse inhibitors, and the obtained five structurally diverse compounds are expected to develop novel BRIs. Copyright © 2017. Published by Elsevier Ltd.

  8. STS-114 Flight Day 3 Highlights

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Video coverage of Day 3 includes highlights of STS-114 during the approach and docking of Discovery with the International Space Station (ISS). The Return to Flight continues with space shuttle crew members (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda) seen in onboard activities on the fore and aft portions of the flight deck during the orbiter's approach. Camarda sends a greeting to his family, and Collins maneuvers Discovery as the ISS appears steadily closer in sequential still video from the centerline camera of the Orbiter Docking System. The approach includes video of Discovery from the ISS during the orbiter's Rendezvous Pitch Maneuver, giving the ISS a clear view of the thermal protection systems underneath the orbiter. Discovery docks with the Destiny Laboratory of the ISS, and the shuttle crew greets the Expedition 11 crew (Commander Sergei Krikalev and NASA ISS Science Officer and Flight Engineer John Phillips) of the ISS onboard the station. Finally, the Space Station Remote Manipulator System hands the Orbiter Boom Sensor System to its counterpart, the Shuttle Remote Manipulator System.

  9. Hardwood sawmill downtime costs

    Treesearch

    Jan Wiedenbeck; Kyle Blackwell

    2003-01-01

    How time flies when you don't pay attention to it. With hardwood sawmill operating costs ranging from $4 to $25 per operating minute ($95/MBF to $335/MBF) and gross profit margins ranging from $0.10/BF to $0.35/BF, five extra minutes of downtime per day will cost a sawmill that produces an average of 20,000 BF per day (5 MMBF annually) between $21 and $73 per day...

  10. Cargo Transfer operations

    NASA Image and Video Library

    2014-08-21

    ISS040-E-103985 (21 Aug. 2014) --- NASA astronaut Steve Swanson, Expedition 40 commander, is pictured during cargo transfer operations in the "Georges Lemaitre" Automated Transfer Vehicle-5 (ATV-5) currently docked with the International Space Station.

  11. Russian and American Apollo-Soyuz Test Project (ASTP) - Prime Crew Portrait

    NASA Image and Video Library

    1975-02-27

    S75-22410 (March 1975) --- These five men compose the two prime crews of the joint United States-USSR Apollo-Soyuz Test Project (ASTP) docking mission in Earth orbit scheduled for July 1975. They are astronaut Thomas P. Stafford (standing on left), commander of the American crew; cosmonaut Aleksey A. Leonov (standing on right), commander of the Soviet crew; astronaut Donald K. Slayton (seated on left), docking module pilot of the American crew; astronaut Vance D. Brand (seated center), command module pilot of the American crew; and cosmonaut Valeriy N. Kubasov (seated on right), engineer on the Soviet crew.

  12. KSC-07pd2240

    NASA Image and Video Library

    2007-08-08

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, STS-118 Pilot Charlie Hobaugh is ready after suitup to head for the launch pad and board Space Shuttle Endeavour. The STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3. The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. NASA/Kim Shiflett

  13. KSC-07pd2234

    NASA Image and Video Library

    2007-08-08

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, STS-118 Mission Specialist Alvin Drew is helped with his helmet during suitup for launch on Space Shuttle Endeavour. The STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3. The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. NASA/Kim Shiflett

  14. KSC-07pd2235

    NASA Image and Video Library

    2007-08-08

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, STS-118 Mission Specialist Tracy Caldwell is helped with her helmet during suitup for launch on Space Shuttle Endeavour. The STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3. The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. NASA/Kim Shiflett

  15. Astronaut Russell Schweickart photographed during EVA

    NASA Image and Video Library

    1969-03-06

    AS09-19-2983 (6 March 1969) --- Astronaut Russell L. Schweickart, lunar module pilot, operates a 70mm Hasselblad camera during his extravehicular activity (EVA) on the fourth day of the Apollo 9 Earth-orbital mission. The Command and Service Modules (CSM) and Lunar Module (LM) "Spider" are docked. This view was taken from the Command Module (CM) "Gumdrop". Schweickart, wearing an Extravehicular Mobility Unit (EMU), is standing in "golden slippers" on the LM porch. On his back, partially visible, are a Portable Life Support System (PLSS) and an Oxygen Purge System (OPS). Astronaut James A. McDivitt, Apollo 9 commander, was inside the "Spider". Astronaut David R. Scott, command module pilot, remained at the controls in the CM.

  16. Apollo 9 Mission image - Astronaut Russell L. Schweickart, lunar module pilot, during EVA

    NASA Image and Video Library

    1969-03-03

    Astronaut Russell L. Schweickart, lunar module pilot, operates a 70mm Hasselblad camera during his extravehicular activity on the fourth day of the Apollo 9 earth-orbital mission. The Command/Service Module and the Lunar Module 3 "Spider" are docked. This view was taken form the Command Module "Gumdrop". Schweickart, wearing an Extravehicular Mobility Unit (EMU), is standing in "golden slippers" on the Lunar Module porch. On his back, partially visible, are a Portable Life Support System (PLSS) and an Oxygen Purge System (OPS). Film magazine was A,film type was SO-368 Ektachrome with 0.460 - 0.710 micrometers film / filter transmittance response and haze filter,80mm lens.

  17. ProSelection: A Novel Algorithm to Select Proper Protein Structure Subsets for in Silico Target Identification and Drug Discovery Research.

    PubMed

    Wang, Nanyi; Wang, Lirong; Xie, Xiang-Qun

    2017-11-27

    Molecular docking is widely applied to computer-aided drug design and has become relatively mature in the recent decades. Application of docking in modeling varies from single lead compound optimization to large-scale virtual screening. The performance of molecular docking is highly dependent on the protein structures selected. It is especially challenging for large-scale target prediction research when multiple structures are available for a single target. Therefore, we have established ProSelection, a docking preferred-protein selection algorithm, in order to generate the proper structure subset(s). By the ProSelection algorithm, protein structures of "weak selectors" are filtered out whereas structures of "strong selectors" are kept. Specifically, the structure which has a good statistical performance of distinguishing active ligands from inactive ligands is defined as a strong selector. In this study, 249 protein structures of 14 autophagy-related targets are investigated. Surflex-dock was used as the docking engine to distinguish active and inactive compounds against these protein structures. Both t test and Mann-Whitney U test were used to distinguish the strong from the weak selectors based on the normality of the docking score distribution. The suggested docking score threshold for active ligands (SDA) was generated for each strong selector structure according to the receiver operating characteristic (ROC) curve. The performance of ProSelection was further validated by predicting the potential off-targets of 43 U.S. Federal Drug Administration approved small molecule antineoplastic drugs. Overall, ProSelection will accelerate the computational work in protein structure selection and could be a useful tool for molecular docking, target prediction, and protein-chemical database establishment research.

  18. Medicinal plant phytochemicals and their inhibitory activities against pancreatic lipase: molecular docking combined with molecular dynamics simulation approach.

    PubMed

    Ahmed, Bilal; Ali Ashfaq, Usman; Usman Mirza, Muhammad

    2018-05-01

    Obesity is the worst health risk worldwide, which is linked to a number of diseases. Pancreatic lipase is considered as an affective cause of obesity and can be a major target for controlling the obesity. The present study was designed to find out best phytochemicals against pancreatic lipase through molecular docking combined with molecular dynamics (MD) simulation. For this purpose, a total of 3770 phytochemicals were docked against pancreatic lipase and ranked them on the basis of binding affinity. Finally, 10 molecules (Kushenol K, Rosmarinic acid, Reserpic acid, Munjistin, Leachianone G, Cephamycin C, Arctigenin, 3-O-acetylpadmatin, Geniposide and Obtusin) were selected that showed strong bonding with the pancreatic lipase. MD simulations were performed on top five compounds using AMBER16. The simulated complexes revealed stability and ligands remained inside the binding pocket. This study concluded that these finalised molecules can be used as drug candidate to control obesity.

  19. Protein Folding: Adding a Nucleus to Guide Helix Docking Reduces Landscape Roughness

    PubMed Central

    Wensley, Beth G.; Kwa, Lee Gyan; Shammas, Sarah L.; Rogers, Joseph M.; Clarke, Jane

    2012-01-01

    The elongated three-helix‐bundle spectrin domains R16 and R17 fold and unfold unusually slowly over a rough energy landscape, in contrast to the homologue R15, which folds fast over a much smoother, more typical landscape. R15 folds via a nucleation–condensation mechanism that guides the docking of the A and C-helices. However, in R16 and R17, the secondary structure forms first and the two helices must then dock in the correct register. Here, we use variants of R16 and R17 to demonstrate that substitution of just five key residues is sufficient to alter the folding mechanism and reduce the landscape roughness. We suggest that, by providing access to an alternative, faster, folding route over their landscape, R16 and R17 can circumvent their slow, frustrated wild-type folding mechanism. PMID:22917971

  20. Autonomous Rendezvous and Docking Conference, volume 1

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. It contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of the ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of the programmatic management, technical, schedule, and cost risks.

  1. Autonomous Rendezvous and Docking Conference, volume 3

    NASA Technical Reports Server (NTRS)

    1990-01-01

    This document consists of the presentation submitted at the Autonomous Rendezvous and Docking (ARD) Conference. The document contains three volumes: ARD hardware technology; ARD software technology; and ARD operations. The purpose of this conference is to identify the technologies required for an on orbit demonstration of ARD, assess the maturity of these technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

  2. Multi-Axis Independent Electromechanical Load Control for Docking System Actuation Development and Verification Using dSPACE

    NASA Technical Reports Server (NTRS)

    Oesch, Christopher; Dick, Brandon; Rupp, Timothy

    2015-01-01

    The development of highly complex and advanced actuation systems to meet customer demands has accelerated as the use of real-time testing technology expands into multiple markets at Moog. Systems developed for the autonomous docking of human rated spacecraft to the International Space Station (ISS), envelope multi-operational characteristics which place unique constraints on an actuation system. Real-time testing hardware has been used as a platform for incremental testing and development for the linear actuation system which controls initial capture and docking for vehicles visiting the ISS. This presentation will outline the role of dSPACE hardware as a platform for rapid control-algorithm prototyping as well as an Electromechanical Actuator (EMA) system dynamic loading simulator, both conducted at Moog to develop the safety critical Linear Actuator System (LAS) of the NASA Docking System (NDS).

  3. Inter-Module Ventilation Changes to the International Space Station Vehicle to Support Integration of the International Docking Adapter and Commercial Crew Vehicles

    NASA Technical Reports Server (NTRS)

    Link, Dwight E., Jr.; Balistreri, Steven F., Jr.

    2015-01-01

    The International Space Station (ISS) Environmental Control and Life Support System (ECLSS) is continuing to evolve in the post-Space Shuttle era. The ISS vehicle configuration that is in operation was designed for docking of a Space Shuttle vehicle, and designs currently under development for commercial crew vehicles require different interfaces. The ECLSS Temperature and Humidity Control Subsystem (THC) Inter-Module Ventilation (IMV) must be modified in order to support two docking interfaces at the forward end of ISS, to provide the required air exchange. Development of a new higher-speed IMV fan and extensive ducting modifications are underway to support the new Commercial Crew Vehicle interfaces. This paper will review the new ECLSS IMV development requirements, component design and hardware status, subsystem analysis and testing performed to date, and implementation plan to support Commercial Crew Vehicle docking.

  4. Ligand Shaping in Induced Fit Docking of MraY Inhibitors. Polynomial Discriminant and Laplacian Operator as Biological Activity Descriptors

    PubMed Central

    Diudea, Mircea V.; Putz, Mihai V.

    2017-01-01

    Docking—i.e., interaction of a small molecule (ligand) with a proteic structure (receptor)—represents the ground of drug action mechanism of the vast majority of bioactive chemicals. Ligand and receptor accommodate their geometry and energy, within this interaction, in the benefit of receptor–ligand complex. In an induced fit docking, the structure of ligand is most susceptible to changes in topology and energy, comparative to the receptor. These changes can be described by manifold hypersurfaces, in terms of polynomial discriminant and Laplacian operator. Such topological surfaces were represented for each MraY (phospho-MurNAc-pentapeptide translocase) inhibitor, studied before and after docking with MraY. Binding affinities of all ligands were calculated by this procedure. For each ligand, Laplacian and polynomial discriminant were correlated with the ligand minimum inhibitory concentration (MIC) retrieved from literature. It was observed that MIC is correlated with Laplacian and polynomial discriminant. PMID:28653980

  5. KSC-98pc1751

    NASA Image and Video Library

    1998-12-01

    KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, Program Manager of the International Space Station (ISS) Randy Brinkley addresses the media before unveiling the name of "Destiny" given the U.S. Lab module, the centerpiece of scientific research on the ISS. With Brinkley on the stand are Center Director Roy Bridges (behind him), and (left to right) STS-98 Commander Ken Cockrell, Pilot Mark Polansky, and Mission Specialist Marsha Ivins. The lab, which is behind them on a workstand, is scheduled to be launched on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the International Space Station. Polansky, Cockrell and Ivins are part of the five-member crew expected to be aboard. The Shuttle will spend six days docked to the station while the laboratory is attached and three space walks are conducted to complete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for station systems, including high data-rate communications, and maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights

  6. Space station operations enhancement using tethers

    NASA Astrophysics Data System (ADS)

    Bekey, I.

    1984-10-01

    Space tethers represent a tool of unusual versatility for applications to operations involving space stations. The present investigation is concerned with a number of applications which exploit the dynamic, static, and electrodynamic properties of tethers. One of the simplest applications of a tethered system on the Space Station might be that of a remote docking port, allowing the Shuttle to dock with no contamination or disturbance effects. Attention is also given to tethered platforms, a tethered microgravity facility, a tethered space station propellant facility, electrodynamic tether principles, a tether power generator, a tether thrust generator (motor), and an electrodynamic tether for drag makeup and energy storage.

  7. Techniques for detumbling a disabled space base

    NASA Technical Reports Server (NTRS)

    Kaplan, M. H.

    1973-01-01

    Techniques and conceptual devices for carrying out detumbling operations are examined, and progress in the development of these concepts is discussed. Devices which reduce tumble to simple spin through active linear motion of a small mass are described, together with a Module for Automatic Dock and Detumble (MADD) that could perform an orbital transfer from the shuttle in order to track and dock at a preselected point on the distressed craft. Once docked, MADD could apply torques by firing thrustors to detumble the passive vehicle. Optimum combinations of mass-motion and external devices for various situation should be developed. The need for completely formulating the automatic control logic of MADD is also emphasized.

  8. Telerobotic rendezvous and docking vision system architecture

    NASA Technical Reports Server (NTRS)

    Gravely, Ben; Myers, Donald; Moody, David

    1992-01-01

    This research program has successfully demonstrated a new target label architecture that allows a microcomputer to determine the position, orientation, and identity of an object. It contains a CAD-like database with specific geometric information about the object for approach, grasping, and docking maneuvers. Successful demonstrations were performed selecting and docking an ORU box with either of two ORU receptacles. Small, but significant differences were seen in the two camera types used in the program, and camera sensitive program elements have been identified. The software has been formatted into a new co-autonomy system which provides various levels of operator interaction and promises to allow effective application of telerobotic systems while code improvements are continuing.

  9. Shared control on lunar spacecraft teleoperation rendezvous operations with large time delay

    NASA Astrophysics Data System (ADS)

    Ya-kun, Zhang; Hai-yang, Li; Rui-xue, Huang; Jiang-hui, Liu

    2017-08-01

    Teleoperation could be used in space on-orbit serving missions, such as object deorbits, spacecraft approaches, and automatic rendezvous and docking back-up systems. Teleoperation rendezvous and docking in lunar orbit may encounter bottlenecks for the inherent time delay in the communication link and the limited measurement accuracy of sensors. Moreover, human intervention is unsuitable in view of the partial communication coverage problem. To solve these problems, a shared control strategy for teleoperation rendezvous and docking is detailed. The control authority in lunar orbital maneuvers that involves two spacecraft as rendezvous and docking in the final phase was discussed in this paper. The predictive display model based on the relative dynamic equations is established to overcome the influence of the large time delay in communication link. We discuss and attempt to prove via consistent, ground-based simulations the relative merits of fully autonomous control mode (i.e., onboard computer-based), fully manual control (i.e., human-driven at the ground station) and shared control mode. The simulation experiments were conducted on the nine-degrees-of-freedom teleoperation rendezvous and docking simulation platform. Simulation results indicated that the shared control methods can overcome the influence of time delay effects. In addition, the docking success probability of shared control method was enhanced compared with automatic and manual modes.

  10. Uncovering potential anti-neuroinflammatory components of Modified Wuziyanzong Prescription through a target-directed molecular docking fingerprint strategy.

    PubMed

    Chen, Jinfeng; Wang, Jinlong; Lu, Yingyuan; Zhao, Shaoyang; Yu, Qian; Wang, Xuemei; Tu, Pengfei; Zeng, Kewu; Jiang, Yong

    2018-05-01

    Neuroinflammation is a main factor in the pathogenesis of neurodegenerative diseases, such as Alzheimer disease. Our previous studies indicated that the modified Wuziyanzong Prescription (MWP) can suppress neuroinflammatory responses via nuclear factor-kappa B (NF-κB) and mitogen-activated protein kinases (MAPKs) signaling pathways. However, the anti-neuroinflammatory components of MWP remain unclear. Herein, a target-directed molecular docking fingerprint (TMDF) strategy, via integrating the chemical profiling and molecular docking approaches, was developed to identify the potential anti-neuroinflammatory components of MWP. First, as many as 120 possible structures, including 49 flavonoids, 28 phenylpropionic acids, 18 amides, 10 carotenoids, eight phenylethanoid glycosides, four lignans, two iridoids, and one triterpenoid were deduced by the source attribution and structural classification-assisted strategy. Then, their geometries were docked against five major targets of the NF-κB and MAPKs signaling cascades, including p38-α, IKKβ, ERK1, ERK2, and TRAF6. The docking results revealed diverse contributions of different components towards the protein targets. Collectively, prenylated flavonoids showed intensive or moderate anti-neuroinflammatory activities, while phenylpropanoids, amides, phenylethanoid glycosides, lignans, and triterpenoids exhibited moderate or weak anti-neuroinflammatory effects. The anti-neuroinflammatory activities of four retrieved prenylated flavonoids were tested by Western blotting assay, and the results mostly agreed with those predicted by the docking method. These gained information demonstrates that the established TMDF strategy could be a rapid and feasible methodology to investigate the potential active components in herbal compound prescriptions. Copyright © 2018 Elsevier B.V. All rights reserved.

  11. Molecular Docking, Molecular Dynamics Simulations, Computational Screening to Design Quorum Sensing Inhibitors Targeting LuxP of Vibrio harveyi and Its Biological Evaluation.

    PubMed

    Rajamanikandan, Sundaraj; Jeyakanthan, Jeyaraman; Srinivasan, Pappu

    2017-01-01

    Quorum sensing (QS) plays an important role in the biofilm formation, production of virulence factors and stress responses in Vibrio harveyi. Therefore, interrupting QS is a possible approach to modulate bacterial behavior. In the present study, three docking protocols, such as Rigid Receptor Docking (RRD), Induced Fit Docking (IFD), and Quantum Polarized Ligand Docking (QPLD) were used to elucidate the binding mode of boronic acid derivatives into the binding pocket of LuxP protein in V. harveyi. Among the three docking protocols, IFD accurately predicted the correct binding mode of the studied inhibitors. Molecular dynamics (MD) simulations of the protein-ligand complexes indicates that the inter-molecular hydrogen bonds formed between the protein and ligand complex remains stable during the simulation time. Pharmacophore and shape-based virtual screening were performed to find selective and potent compounds from ChemBridge database. Five hit compounds were selected and subjected to IFD and MD simulations to validate the binding mode. In addition, enrichment calculation was performed to discriminate and separate active compounds from the inactive compounds. Based on the computational studies, the potent Bicyclo [2.2.1] hept-5-ene-2,3-dicarboxylic acid-2,6-dimethylpyridine 1-oxide (ChemBridge_5144368) was selected for in vitro assays. The compound exhibited dose dependent inhibition in bioluminescence and also inhibits biofilm formation in V. harveyi to the level of 64.25 %. The result from the study suggests that ChemBridge_5144368 could serve as an anti-quorum sensing molecule for V. harveyi.

  12. [Study on anti-hyperlipidemia mechanism of high frequency herb pairs by molecular docking method].

    PubMed

    Jiang, Lu-di; He, Yu-su; Chen, Xi; Tao, Ou; Li, Gong-Yu; Zhang, Yan-ling

    2015-06-01

    Traditional Chinese medicine (TCM) has definitely clinical effect in treating hyperlipidemia, but the action mechanism still need to be explored. Based on consulting Chinese Pharmacopoeia (2010), all the lipid-lowering Chinese patent medicines were analyzed by associated rules data mining method to explore high frequency herb pairs. The top three couplet medicines with high support degree were Puerariae Lobatae Radix-Crataegi Fructus, Salviae Miltiorrhizae Radix et Rhizoma-Crataegi Fructus, and Polygoni Multiflori Radix-Crataegi Fructus. The 20 main ingredients were selected from the herb pairs and docked with 3 key hyperlipidemia targets, namely 3-hydroxy-3-methylglutaryl coenzyme A reductase (HMG-CoA reductase), peroxisome proliferator activated receptor-α (PPAR-α ) and niemann-pick C1 like 1 (NPC1L1) to further discuss the molecular mechanism of the high frequency herb pairs, by using the docking program, LibDock. To construct evaluation rules for the ingredients of herb pairs, the root-mean-square deviation (RMSD) value between computed and initial complexes was first calculated to validate the fitness of LibDock models. Then, the key residues were also confirmed by analyzing the interactions of those 3 proteins and corresponding marketed drugs. The docking results showed that hyperin, puerarin, salvianolic acid A and polydatin can interact with two targets, and the other five compounds may be potent for at least one of the three targets. In this study, the multi-target effect of high frequency herb pairs for lipid-lowering was discussed on the molecular level, which can help further researching new multi-target anti-hyperlipidemia drug.

  13. Combined 3D-QSAR and molecular docking study on 7,8-dialkyl-1,3-diaminopyrrolo-[3,2-f] Quinazoline series compounds to understand the binding mechanism of DHFR inhibitors

    NASA Astrophysics Data System (ADS)

    Aouidate, Adnane; Ghaleb, Adib; Ghamali, Mounir; Chtita, Samir; Choukrad, M'barek; Sbai, Abdelouahid; Bouachrine, Mohammed; Lakhlifi, Tahar

    2017-07-01

    A series of nineteen DHFR inhibitors was studied based on the combination of two computational techniques namely, three-dimensional quantitative structure activity relationship (3D-QSAR) and molecular docking. The comparative molecular field analysis (CoMFA) and comparative molecular similarity index analysis (CoMSIA) were developed using 19 molecules having pIC50 ranging from 9.244 to 5.839. The best CoMFA and CoMSIA models show conventional determination coefficients R2 of 0.96 and 0.93 as well as the Leave One Out cross-validation determination coefficients Q2 of 0.64 and 0.72, respectively. The predictive ability of those models was evaluated by the external validation using a test set of five compounds with predicted determination coefficients R2test of 0.92 and 0.94, respectively. The binding mode between this kind of compounds and the DHFR enzyme in addition to the key amino acid residues were explored by molecular docking simulation. Contour maps and molecular docking identified that the R1 and R2 natures at the pyrazole moiety are the important features for the optimization of the binding affinity to the DHFR receptor. According to the good concordance between the CoMFA/CoMSIA contour maps and docking results, the obtained information was explored to design novel molecules.

  14. The pepATTRACT web server for blind, large-scale peptide-protein docking.

    PubMed

    de Vries, Sjoerd J; Rey, Julien; Schindler, Christina E M; Zacharias, Martin; Tuffery, Pierre

    2017-07-03

    Peptide-protein interactions are ubiquitous in the cell and form an important part of the interactome. Computational docking methods can complement experimental characterization of these complexes, but current protocols are not applicable on the proteome scale. pepATTRACT is a novel docking protocol that is fully blind, i.e. it does not require any information about the binding site. In various stages of its development, pepATTRACT has participated in CAPRI, making successful predictions for five out of seven protein-peptide targets. Its performance is similar or better than state-of-the-art local docking protocols that do require binding site information. Here we present a novel web server that carries out the rigid-body stage of pepATTRACT. On the peptiDB benchmark, the web server generates a correct model in the top 50 in 34% of the cases. Compared to the full pepATTRACT protocol, this leads to some loss of performance, but the computation time is reduced from ∼18 h to ∼10 min. Combined with the fact that it is fully blind, this makes the web server well-suited for large-scale in silico protein-peptide docking experiments. The rigid-body pepATTRACT server is freely available at http://bioserv.rpbs.univ-paris-diderot.fr/services/pepATTRACT. © The Author(s) 2017. Published by Oxford University Press on behalf of Nucleic Acids Research.

  15. Application of fuzzy logic-neural network based reinforcement learning to proximity and docking operations: Attitude control results

    NASA Technical Reports Server (NTRS)

    Jani, Yashvant

    1992-01-01

    As part of the RICIS activity, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Max satellite simulation. This activity is carried out in the software technology laboratory utilizing the Orbital Operations Simulator (OOS). This report is deliverable D2 Altitude Control Results and provides the status of the project after four months of activities and outlines the future plans. In section 2 we describe the Fuzzy-Learner system for the attitude control functions. In section 3, we provide the description of test cases and results in a chronological order. In section 4, we have summarized our results and conclusions. Our future plans and recommendations are provided in section 5.

  16. Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Lab

    NASA Technical Reports Server (NTRS)

    Brewster, Linda L.; Howard, Richard T.; Johnston, A. S.; Carrington, Connie; Mitchell, Jennifer D.; Cryan, Scott P.

    2008-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success ofthe Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor-proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-Ioop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of "pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS.' The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (l) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multisensor series oftrajectories

  17. Imaging Flash Lidar for Autonomous Safe Landing and Spacecraft Proximity Operation

    NASA Technical Reports Server (NTRS)

    Amzajerdian, Farzin; Roback, Vincent E.; Brewster, Paul F.; Hines, Glenn D.; Bulyshev, Alexander E.

    2016-01-01

    3-D Imaging flash lidar is recognized as a primary candidate sensor for safe precision landing on solar system bodies (Moon, Mars, Jupiter and Saturn moons, etc.), and autonomous rendezvous proximity operations and docking/capture necessary for asteroid sample return and redirect missions, spacecraft docking, satellite servicing, and space debris removal. During the final stages of landing, from about 1 km to 500 m above the ground, the flash lidar can generate 3-Dimensional images of the terrain to identify hazardous features such as craters, rocks, and steep slopes. The onboard fli1ght computer can then use the 3-D map of terrain to guide the vehicle to a safe location. As an automated rendezvous and docking sensor, the flash lidar can provide relative range, velocity, and bearing from an approaching spacecraft to another spacecraft or a space station from several kilometers distance. NASA Langley Research Center has developed and demonstrated a flash lidar sensor system capable of generating 16k pixels range images with 7 cm precision, at a 20 Hz frame rate, from a maximum slant range of 1800 m from the target area. This paper describes the lidar instrument design and capabilities as demonstrated by the closed-loop flight tests onboard a rocket-propelled free-flyer vehicle (Morpheus). Then a plan for continued advancement of the flash lidar technology will be explained. This proposed plan is aimed at the development of a common sensor that with a modest design adjustment can meet the needs of both landing and proximity operation and docking applications.

  18. Apollo-Soyuz test project. Operations handbook command/service/docking modules (CSM 119/DM 1): Operational procedures reference issue

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Operational and configuration checks for the Apollo-Soyuz Test Project are presented. The checks include: backup crew prelaunch, prime crew prelaunch, boost and insertion, G and C reference data, G and N reference modes, rendezvous, navigation, Apollo-Soyuz operations, abort procedures, and emergency procedures.

  19. An autonomous rendezvous and docking system using cruise missile technology

    NASA Technical Reports Server (NTRS)

    Jones, ED; Nicholson, Bruce

    1991-01-01

    In November 1990 General Dynamics demonstrated an AR&D system for members of the Strategic Avionics Technology Working Group. This simulation utilized prototype hardware derived from the Cruise Missile and Centaur avionics systems. The object of this proof of concept demonstration was to show that all the accuracy, reliability, and operational requirements established for a spacecraft to dock with Space Station Freedom could be met by the proposed AR&D system.

  20. Spacecraft flight simulation: A human factors investigation into the man-machine interface between an astronaut and a spacecraft performing docking maneuvers and other proximity operations

    NASA Technical Reports Server (NTRS)

    Brody, Adam R.

    1988-01-01

    The anticipated increase in rendezvous and docking activities in the various space programs in the Space Station era necessitates a renewed interest in manual docking procedures. Ten test subjects participated in computer simulated docking missions in which the influence of initial velocity was examined. All missions started from a resting position of 304.8 meters (1000 feet) along the space station's +V-bar axis. Test subjects controlled their vehicle with a translational hand controller and digital auto pilot which are both virtually identical to their space shuttle counterparts. While the 0.1 percent rule (range rate is equal to 0.1 percent of the range) used by space shuttle pilots is comfortably safe, it is revealed to be extremely inefficient in terms of time and not justifiable in terms of marginal safety. Time is worth money, not only because of training and launch costs, but because the sooner a pilot and spacecraft return from a mission, the sooner they can begin the next one. Inexperienced test subjects reduced the costs of simulated docking by close to a factor of 2 and achieved safe dockings in less than 4 percent of the time the baseline approach would entail. This reduction in time can be used to save lives in the event of an accident on orbit, and can tremendously reduce docking costs if fuel is produced from waste water on orbit.

  1. Relationship between automation trust and operator performance for the novice and expert in spacecraft rendezvous and docking (RVD).

    PubMed

    Niu, Jianwei; Geng, He; Zhang, Yijing; Du, Xiaoping

    2018-09-01

    Operator trust in automation is a crucial factor influencing its use and operational performance. However, the relationship between automation trust and performance remains poorly understood and requires further investigation. The objective of this paper is to explore the difference in trust and performance on automation-aided spacecraft rendezvous and docking (RVD) between the novice and the expert and to investigate the relationship between automation trust and performance as well. We employed a two-factor mixed design, with training skill (novice and expert) and automation mode (manual RVD and automation aided RVD) serving as the two factors. Twenty participants, 10 novices and 10 experts, were recruited to conduct six RVD tasks for two automation levels. After the tasks, operator performance was recorded by the desktop hand-held docking training equipment. Operator trust was also measured by a 12-items questionnaire at the beginning and end of each trial. As a result, automation narrowed the performance gap significantly between the novice and the expert, and the automation trust showed a marginally significant difference between the novice and the expert. Furthermore, the result demonstrated that the attitude angle control error of the expert was related to the total trust score, whereas other automation performance indicators were not related to the total score of trust. However, automation performance was related to the dimensions of trust, such as entrust, harmful, and dependable. Copyright © 2018 Elsevier Ltd. All rights reserved.

  2. Computational Insight into Protein Tyrosine Phosphatase 1B Inhibition: A Case Study of the Combined Ligand- and Structure-Based Approach.

    PubMed

    Zhang, Xiangyu; Jiang, Hailun; Li, Wei; Wang, Jian; Cheng, Maosheng

    2017-01-01

    Protein tyrosine phosphatase 1B (PTP1B) is an attractive target for treating cancer, obesity, and type 2 diabetes. In our work, the way of combined ligand- and structure-based approach was applied to analyze the characteristics of PTP1B enzyme and its interaction with competitive inhibitors. Firstly, the pharmacophore model of PTP1B inhibitors was built based on the common feature of sixteen compounds. It was found that the pharmacophore model consisted of five chemical features: one aromatic ring (R) region, two hydrophobic (H) groups, and two hydrogen bond acceptors (A). To further elucidate the binding modes of these inhibitors with PTP1B active sites, four docking programs (AutoDock 4.0, AutoDock Vina 1.0, standard precision (SP) Glide 9.7, and extra precision (XP) Glide 9.7) were used. The characteristics of the active sites were then described by the conformations of the docking results. In conclusion, a combination of various pharmacophore features and the integration information of structure activity relationship (SAR) can be used to design novel potent PTP1B inhibitors.

  3. Orion Handling Qualities During ISS Rendezvous and Docking

    NASA Technical Reports Server (NTRS)

    Hart, Jeremy J.; Stephens, J. P.; Spehar, P.; Bilimoria, K.; Foster, C.; Gonzalex, R.; Sullivan, K.; Jackson, B.; Brazzel, J.; Hart, J.

    2011-01-01

    The Orion spacecraft was designed to rendezvous with multiple vehicles in low earth orbit (LEO) and beyond. To perform the required rendezvous and docking task, Orion must provide enough control authority to perform coarse translational maneuvers while maintaining precision to perform the delicate docking corrections. While Orion has autonomous docking capabilities, it is expected that final approach and docking operations with the International Space Station (ISS) will initially be performed in a manual mode. A series of evaluations was conducted by NASA and Lockheed Martin at the Johnson Space Center to determine the handling qualities (HQ) of the Orion spacecraft during different docking and rendezvous conditions using the Cooper-Harper scale. This paper will address the specifics of the handling qualities methodology, vehicle configuration, scenarios flown, data collection tools, and subject ratings and comments. The initial Orion HQ assessment examined Orion docking to the ISS. This scenario demonstrates the Translational Hand Controller (THC) handling qualities of Orion. During this initial assessment, two different scenarios were evaluated. The first was a nominal docking approach to a stable ISS, with Orion initializing with relative position dispersions and a closing rate of approximately 0.1 ft/sec. The second docking scenario was identical to the first, except the attitude motion of the ISS was modeled to simulate a stress case ( 1 degree deadband per axis and 0.01 deg/sec rate deadband per axis). For both scenarios, subjects started each run on final approach at a docking port-to-port range of 20 ft. Subjects used the THC in pulse mode with cues from the docking camera image, window views, and range and range rate data displayed on the Orion display units. As in the actual design, the attitude of the Orion vehicle was held by the automated flight control system at 0.5 degree deadband per axis. Several error sources were modeled including Reaction Control System (RCS) jet angular and position misalignment, RCS thrust magnitude uncertainty, RCS jet force direction uncertainty due to self plume impingement, and Orion center of mass uncertainty.

  4. STS-74 Flight Day 5

    NASA Technical Reports Server (NTRS)

    1995-01-01

    On this fifth day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hadfield, were awakened to the theme from the movie '2001: A Space Odyssey.' The Mir 20 cosmonauts, Cmdr. Yuri Gidzenko, Flight Engineer Sergei Avdeyev, and Cosmonaut-Researcher (ESA) Thomas Reiter, and shuttle astronauts are shown giving each other plaques and presents to commemorate their historic docking event and the start towards the development of the International Space Station. There is a press conference from Moscow by a one of the officers of the Russian Space Agency with both flight crews and an additional separate press interview of the crews by Canadian reporters. There is video footage of the two docked spacecraft taken from various angles.

  5. STS-74 flight day 5

    NASA Astrophysics Data System (ADS)

    1995-11-01

    On this fifth day of the STS-74 mission, the flight crew, Cmdr. Kenneth Cameron, Pilot James Halsell, and Mission Specialists William McArthur, Jerry Ross, and Chris Hatfield, were awakened to the theme from the movie 2001: A Space Odyssey'. The Mir 20 cosmonauts, Cmdr. Yuri Gidzenko, Flight Engineer Sergei Avdeyev, and Cosmonaut-Researcher (ESA) Thomas Reiter, and shuttle astronauts are shown giving each other plaques and presents to commemorate their historic docking event and the start towards the development of the International Space Station. There is a press conference from Moscow by a one of the officers of the Russian Space Agency with both flight crews and an additional separate press interview of the crews by Canadian reporters. There is video footage of the two docked spacecraft taken from various angles.

  6. Whitson floats next to the MSG in the Destiny U.S. Lab during STS-111 UF-2 docked OPS

    NASA Image and Video Library

    2002-06-09

    STS111-E-5121 (9 June 2002) --- Astronaut Peggy A. Whitson, Expedition Five flight engineer, floats near the Microgravity Science Glovebox (MSG) in the Destiny laboratory on the International Space Station (ISS).

  7. Methodology for Developing a Probabilistic Risk Assessment Model of Spacecraft Rendezvous and Dockings

    NASA Technical Reports Server (NTRS)

    Farnham, Steven J., II; Garza, Joel, Jr.; Castillo, Theresa M.; Lutomski, Michael

    2011-01-01

    In 2007 NASA was preparing to send two new visiting vehicles carrying logistics and propellant to the International Space Station (ISS). These new vehicles were the European Space Agency s (ESA) Automated Transfer Vehicle (ATV), the Jules Verne, and the Japanese Aerospace and Explorations Agency s (JAXA) H-II Transfer Vehicle (HTV). The ISS Program wanted to quantify the increased risk to the ISS from these visiting vehicles. At the time, only the Shuttle, the Soyuz, and the Progress vehicles rendezvoused and docked to the ISS. The increased risk to the ISS was from an increase in vehicle traffic, thereby, increasing the potential catastrophic collision during the rendezvous and the docking or berthing of the spacecraft to the ISS. A universal method of evaluating the risk of rendezvous and docking or berthing was created by the ISS s Risk Team to accommodate the increasing number of rendezvous and docking or berthing operations due to the increasing number of different spacecraft, as well as the future arrival of commercial spacecraft. Before the first docking attempt of ESA's ATV and JAXA's HTV to the ISS, a probabilistic risk model was developed to quantitatively calculate the risk of collision of each spacecraft with the ISS. The 5 rendezvous and docking risk models (Soyuz, Progress, Shuttle, ATV, and HTV) have been used to build and refine the modeling methodology for rendezvous and docking of spacecrafts. This risk modeling methodology will be NASA s basis for evaluating the addition of future ISS visiting spacecrafts hazards, including SpaceX s Dragon, Orbital Science s Cygnus, and NASA s own Orion spacecraft. This paper will describe the methodology used for developing a visiting vehicle risk model.

  8. MS Malenchenko tapes brackets in Zvezda during STS-106

    NASA Image and Video Library

    2000-09-13

    S106-E-5175 (13 September) --- Cosmonaut Yuri I. Malenchenko, representing the Russian Aviation and Space Agency, tapes brackets for the Zvezda during work on the service module. The mission specialist and the other STS-106 astronauts and cosmonaut are continuing electrical work and transfer activities as they near the halfway point of docked operations with the International Space Station. In all the crew will have 189 hours, 40 minutes of planned Atlantis-ISS docked time.

  9. ISS Interface Mechanisms and their Heritage

    NASA Technical Reports Server (NTRS)

    Cook, John G.; Aksamentov, Valery; Hoffman, Thomas; Bruner, Wes

    2011-01-01

    The International Space Station, by nurturing technological development of a variety of pressurized and unpressurized interface mechanisms fosters "competition at the technology level". Such redundancy and diversity allows for the development and testing of mechanisms that might be used for future exploration efforts. The International Space Station, as a test-bed for exploration, has 4 types of pressurized interfaces between elements and 6 unpressurized attachment mechanisms. Lessons learned from the design, test and operations of these mechanisms will help inform the design for a new international standard pressurized docking mechanism for the NASA Docking System. This paper will examine the attachment mechanisms on the ISS and their attributes. It will also look ahead at the new NASA docking system and trace its lineage to heritage mechanisms.

  10. STS-89 M.S. Andrew Thomas waves to crowd during walkout

    NASA Technical Reports Server (NTRS)

    1998-01-01

    STS-89 Mission Specialist Andrew Thomas, Ph.D., smiles and waves his Australian hat to the crowd outside of the Operations and Checkout Building at KSC as he heads toward the Astrovan that will transport him to Launch Pad 39A. There, the Space Shuttle Endeavour awaits to take the STS-89 crew to Russia's Mir space station, where Dr. Thomas, who was born and educated in South Australia, will succeed David Wolf, M.D. STS-89, slated for a 9:48 p.m. EST liftoff Jan. 22, is the eighth docking with the Russian Space Station Mir, the first Mir docking for Endeavour (all previous dockings were made by Atlantis), and the first launch of 1998.

  11. Mir Space Station survey pre- and post-docking during STS-76 mission

    NASA Image and Video Library

    1996-03-24

    STS076-705-019 (23 March 1996) --- Backdropped against the darkness of space, Russia's Mir Space Station is seen from the aft flight deck window of the Space Shuttle Atlantis. The two spacecraft were about to make their third docking in Earth-orbit. With the subsequent delivery of astronaut Shannon W. Lucid to the Mir Space Station, the Mir-21 crew grew to three, as the mission specialist quickly becomes a cosmonaut guest researcher. She will spend approximately 140 days on Mir before returning to Earth.

  12. KSC-07pd2238

    NASA Image and Video Library

    2007-08-08

    KENNEDY SPACE CENTER, FLA. -- In the Operations and Checkout Building, STS-118 Commander Scott Kelly dons his launch and entry suit for launch aboard Space Shuttle Endeavour. This is Kelly's second spaceflight. The STS-118 mission is the 22nd shuttle flight to the International Space Station. It will continue space station construction by delivering a third starboard truss segment, S5, and other payloads such as the SPACEHAB module and the external stowage platform 3. The 11-day mission may be extended to as many as 14 depending on the test of the Station-to-Shuttle Power Transfer System that will allow the docked shuttle to draw electrical power from the station and extend its visits to the orbiting lab. NASA/Kim Shiflett

  13. STS-86 Mission Specialist David Wolf suits up

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-86 Mission Specialist David A. Wolf gets assistance from a suit technician while donning his orange launch and entry suit in the Operations and Checkout Building. This will be Wolfs second flight. He and the six other crew members will depart shortly for Launch Pad 39A, where the Space Shuttle Atlantis awaits liftoff on a 10-day mission slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. Wolf will transfer to the Mir 24 crew, replacing U.S. astronaut C. Michael Foale, who will return to Earth aboard Atlantis with the rest of the STS-86 crew. Wolf is expected to live and work aboard the Russian space station for about four months.

  14. Boom Rendezvous Alternative Docking Approach

    NASA Technical Reports Server (NTRS)

    Bonometti, Joseph A.

    2006-01-01

    Space rendezvous and docking has always been attempted with primarily one philosophic methodology. The slow matching of one vehicle's orbit by a second vehicle and then a final closing sequence that ends in matching the orbits with perfect precision and with near zero relative velocities. The task is time consuming, propellant intensive, risk inherent (plume impingement, collisions, fuel depletion, etc.) and requires substantial hardware mass. The historical background and rationale as to why this approach is used is discussed in terms of the path-not-taken and in light of an alternate methodology. Rendezvous and docking by boom extension is suggested to have inherent advantages that today s technology can readily exploit. Extension from the primary spacecraft, beyond its inherent large inertia, allows low inertia connections to be made rapidly and safely. Plume contamination issues are eliminated as well as the extra propellant mass and risk required for the final thruster (docking) operations. Space vehicle connection hardware can be significantly lightened. Also, docking sensors and controls require less fidelity; allowing them to be more robust and less sensitive. It is the potential safety advantage and mission risk reduction that makes this approach attractive, besides the prospect of nominal time and mass savings.

  15. ATV during Demonstration Day 2 Rendezvous Test

    NASA Image and Video Library

    2008-03-31

    ISS016-E-034177 (31 March 2008) --- Backdropped by the blackness of space, the Jules Verne Automated Transfer Vehicle (ATV) approaches the International Space Station on Monday, March 31, 2008, for its "Demo Day 2" practice maneuvers. It moved to within 36 feet of the Zvezda Service Module in a rehearsal for docking on Thursday.

  16. ATV during Demonstration Day 2 Rendezvous Test

    NASA Image and Video Library

    2008-03-31

    ISS016-E-034176 (31 March 2008) --- Backdropped by the blackness of space, the Jules Verne Automated Transfer Vehicle (ATV) approaches the International Space Station on Monday, March 31, 2008, for its "Demo Day 2" practice maneuvers. It moved to within 36 feet of the Zvezda Service Module in a rehearsal for docking on Thursday.

  17. Ferguson Troubleshoots GPC 3

    NASA Image and Video Library

    2011-07-11

    S135-E-007350 (11 July 2011) --- NASA astronaut Chris Ferguson, STS-135 mission commander, toggles switches on the overhead panel of the forward flight deck of the space shuttle Atlantis. The image was recorded during the mission's fourth day of activities in Earth orbit and second day while being docked with the International Space Station. Photo credit: NASA

  18. Lipoxygenase directed anti-inflammatory and anti-cancerous secondary metabolites: ADMET-based screening, molecular docking and dynamics simulation.

    PubMed

    Singh, Swati; Awasthi, Manika; Pandey, Veda P; Dwivedi, Upendra N

    2017-02-01

    Lipoxygenases (LOXs), key enzymes involved in the biosynthesis of leukotrienes, are well known to participate in the inflammatory and immune responses. With the recent reports of involvement of 5-LOX (one of the isozymes of LOX in human) in cancer, there is a need to find out selective inhibitors of 5-LOX for their therapeutic application. In the present study, plant-derived 300 anti-inflammatory and anti-cancerous secondary metabolites (100 each of alkaloids, flavonoids and terpenoids) have been screened for their pharmacokinetic properties and subsequently docked for identification of potent inhibitors of 5-LOX. Pharmacokinetic analyses revealed that only 18 alkaloids, 26 flavonoids, and 9 terpenoids were found to fulfill all the absorption, distribution, metabolism, excretion, and toxicity descriptors as well as those of Lipinski's Rule of Five. Docking analyses of pharmacokinetically screened metabolites and their comparison with a known inhibitor (drug), namely zileuton revealed that only three alkaloids, six flavonoids and three terpenoids were found to dock successfully with 5-LOX with the flavonoid, velutin being the most potent inhibitor among all. The results of the docking analyses were further validated by performing molecular dynamics simulation and binding energy calculations for the complexes of 5-LOX with velutin, galangin, chrysin (in order of LibDock scores), and zileuton. The data revealed stabilization of all the complexes within 15 ns of simulation with velutin complex exhibiting least root-mean-square deviation value (.285 ± .007 nm) as well as least binding energy (ΔG bind  = -203.169 kJ/mol) as compared to others during the stabilization phase of simulation.

  19. Multibody dynamical modeling for spacecraft docking process with spring-damper buffering device: A new validation approach

    NASA Astrophysics Data System (ADS)

    Daneshjou, Kamran; Alibakhshi, Reza

    2018-01-01

    In the current manuscript, the process of spacecraft docking, as one of the main risky operations in an on-orbit servicing mission, is modeled based on unconstrained multibody dynamics. The spring-damper buffering device is utilized here in the docking probe-cone system for micro-satellites. Owing to the impact occurs inevitably during docking process and the motion characteristics of multibody systems are remarkably affected by this phenomenon, a continuous contact force model needs to be considered. Spring-damper buffering device, keeping the spacecraft stable in an orbit when impact occurs, connects a base (cylinder) inserted in the chaser satellite and the end of docking probe. Furthermore, by considering a revolute joint equipped with torsional shock absorber, between base and chaser satellite, the docking probe can experience both translational and rotational motions simultaneously. Although spacecraft docking process accompanied by the buffering mechanisms may be modeled by constrained multibody dynamics, this paper deals with a simple and efficient formulation to eliminate the surplus generalized coordinates and solve the impact docking problem based on unconstrained Lagrangian mechanics. By an example problem, first, model verification is accomplished by comparing the computed results with those recently reported in the literature. Second, according to a new alternative validation approach, which is based on constrained multibody problem, the accuracy of presented model can be also evaluated. This proposed verification approach can be applied to indirectly solve the constrained multibody problems by minimum required effort. The time history of impact force, the influence of system flexibility and physical interaction between shock absorber and penetration depth caused by impact are the issues followed in this paper. Third, the MATLAB/SIMULINK multibody dynamic analysis software will be applied to build impact docking model to validate computed results and then, investigate the trajectories of both satellites to take place the successful capture process.

  20. Scoring ligand similarity in structure-based virtual screening.

    PubMed

    Zavodszky, Maria I; Rohatgi, Anjali; Van Voorst, Jeffrey R; Yan, Honggao; Kuhn, Leslie A

    2009-01-01

    Scoring to identify high-affinity compounds remains a challenge in virtual screening. On one hand, protein-ligand scoring focuses on weighting favorable and unfavorable interactions between the two molecules. Ligand-based scoring, on the other hand, focuses on how well the shape and chemistry of each ligand candidate overlay on a three-dimensional reference ligand. Our hypothesis is that a hybrid approach, using ligand-based scoring to rank dockings selected by protein-ligand scoring, can ensure that high-ranking molecules mimic the shape and chemistry of a known ligand while also complementing the binding site. Results from applying this approach to screen nearly 70 000 National Cancer Institute (NCI) compounds for thrombin inhibitors tend to support the hypothesis. EON ligand-based ranking of docked molecules yielded the majority (4/5) of newly discovered, low to mid-micromolar inhibitors from a panel of 27 assayed compounds, whereas ranking docked compounds by protein-ligand scoring alone resulted in one new inhibitor. Since the results depend on the choice of scoring function, an analysis of properties was performed on the top-scoring docked compounds according to five different protein-ligand scoring functions, plus EON scoring using three different reference compounds. The results indicate that the choice of scoring function, even among scoring functions measuring the same types of interactions, can have an unexpectedly large effect on which compounds are chosen from screening. Furthermore, there was almost no overlap between the top-scoring compounds from protein-ligand versus ligand-based scoring, indicating the two approaches provide complementary information. Matchprint analysis, a new addition to the SLIDE (Screening Ligands by Induced-fit Docking, Efficiently) screening toolset, facilitated comparison of docked molecules' interactions with those of known inhibitors. The majority of interactions conserved among top-scoring compounds for a given scoring function, and from the different scoring functions, proved to be conserved interactions in known inhibitors. This was particularly true in the S1 pocket, which was occupied by all the docked compounds. (c) 2009 John Wiley & Sons, Ltd.

  1. Ligand Docking to Intermediate and Close-To-Bound Conformers Generated by an Elastic Network Model Based Algorithm for Highly Flexible Proteins

    PubMed Central

    Kurkcuoglu, Zeynep; Doruker, Pemra

    2016-01-01

    Incorporating receptor flexibility in small ligand-protein docking still poses a challenge for proteins undergoing large conformational changes. In the absence of bound structures, sampling conformers that are accessible by apo state may facilitate docking and drug design studies. For this aim, we developed an unbiased conformational search algorithm, by integrating global modes from elastic network model, clustering and energy minimization with implicit solvation. Our dataset consists of five diverse proteins with apo to complex RMSDs 4.7–15 Å. Applying this iterative algorithm on apo structures, conformers close to the bound-state (RMSD 1.4–3.8 Å), as well as the intermediate states were generated. Dockings to a sequence of conformers consisting of a closed structure and its “parents” up to the apo were performed to compare binding poses on different states of the receptor. For two periplasmic binding proteins and biotin carboxylase that exhibit hinge-type closure of two dynamics domains, the best pose was obtained for the conformer closest to the bound structure (ligand RMSDs 1.5–2 Å). In contrast, the best pose for adenylate kinase corresponded to an intermediate state with partially closed LID domain and open NMP domain, in line with recent studies (ligand RMSD 2.9 Å). The docking of a helical peptide to calmodulin was the most challenging case due to the complexity of its 15 Å transition, for which a two-stage procedure was necessary. The technique was first applied on the extended calmodulin to generate intermediate conformers; then peptide docking and a second generation stage on the complex were performed, which in turn yielded a final peptide RMSD of 2.9 Å. Our algorithm is effective in producing conformational states based on the apo state. This study underlines the importance of such intermediate states for ligand docking to proteins undergoing large transitions. PMID:27348230

  2. Multiple Exposure of Rendezvous Docking Simulator - Gemini Program

    NASA Image and Video Library

    1964-02-07

    Multiple exposure of Rendezvous Docking Simulator. Francis B. Smith, described the simulator as follows: The rendezvous and docking operation of the Gemini spacecraft with the Agena and of the Apollo Command Module with the Lunar Excursion Module have been the subject of simulator studies for several years. This figure illustrates the Gemini-Agena rendezvous docking simulator at Langley. The Gemini spacecraft was supported in a gimbal system by an overhead crane and gantry arrangement which provided 6 degrees of freedom - roll, pitch, yaw, and translation in any direction - all controllable by the astronaut in the spacecraft. Here again the controls fed into a computer which in turn provided an input to the servos driving the spacecraft so that it responded to control motions in a manner which accurately simulated the Gemini spacecraft. -- Published in Barton C. Hacker and James M. Grimwood, On the Shoulders of Titans: A History of Project Gemini, NASA SP-4203 Francis B. Smith, Simulators for Manned Space Research, Paper presented at the 1966 IEEE International convention, March 21-25, 1966.

  3. STS-71 hardware assembly view

    NASA Image and Video Library

    1994-12-02

    S94-47810 (2 Dec. 1994) --- Lockheed Space Operations Company workers in the Extended Duration Orbiter (EDO) Facility, located inside the Vehicle Assembly Building (VAB), carefully hoist the Orbiter Docking System (ODS) from its shipping container into a test stand. The ODS was shipped in a horizontal position to the Kennedy Space Center (KSC) from contractor Rockwell Aerospace's Downey plant. Once the ODS is upright, work can continue to prepare the hardware for the first docking of the United States Space Shuttle and Russian Space Station MIR in 1995. The ODS contains both United States-made and Russian-made hardware. The black band is Russian-made thermal insulation protecting part of the docking mechanism, also Russian-made, called the Androgynous Peripheral Docking System (APDS). A red protective cap covers the APDS itself. Other elements of the ODS, most of it protected by white United States-made thermal insulation, were developed by Rockwell, which also integrated and checked out the assembled Russian-United States system.

  4. Performance of Subscale Docking Seals Under Simulated Temperature Conditions

    NASA Technical Reports Server (NTRS)

    Smith, Ian M.; Daniels, Christopher C.

    2008-01-01

    A universal docking system is being developed by the National Aeronautics and Space Administration (NASA) to support future space exploration missions to low Earth orbit (LEO), to the moon, and to Mars. The candidate docking seals for the system are a composite design consisting of elastomer seal bulbs molded into the front and rear sides of a metal ring. The test specimens were subscale seals with two different elastomer cross-sections and a 12-in. outside diameter. The seal assemblies were mated in elastomer seal-on-metal plate and elastomer seal-on-elastomer seal configurations. The seals were manufactured from S0383-70 silicone elastomer compound. Nominal and off-nominal joint configurations were examined. Both the compression load required to mate the seals and the leak rate observed were recorded while the assemblies were subjected to representative docking system operating temperatures of -58, 73, and 122 F (-50, 23, and 50 C). Both the loads required to fully compress the seals and their leak rates were directly proportional to the test temperature.

  5. GREEN: A program package for docking studies in rational drug design

    NASA Astrophysics Data System (ADS)

    Tomioka, Nobuo; Itai, Akiko

    1994-08-01

    A program package, GREEN, has been developed that enables docking studies between ligand molecules and a protein molecule. Based on the structure of the protein molecule, the physical and chemical environment of the ligand-binding site is expressed as three-dimensional grid-point data. The grid-point data are used for the real-time evaluation of the protein-ligand interaction energy, as well as for the graphical representation of the binding-site environment. The interactive docking operation is facilitated by various built-in functions, such as energy minimization, energy contribution analysis and logging of the manipulation trajectory. Interactive modeling functions are incorporated for designing new ligand molecules while considering the binding-site environment and the protein-ligand interaction. As an example of the application of GREEN, a docking study is presented on the complex between trypsin and a synthetic trypsin inhibitor. The program package will be useful for rational drug design, based on the 3D structure of the target protein.

  6. Inflight - Apollo 9 (Crew Activities)

    NASA Image and Video Library

    1969-03-06

    S69-26150 (6 March 1969) --- Television watchers on Earth saw this view of the Apollo 9 Command Module during the second live telecast from Apollo 9 early Thursday afternoon on the fourth day in space. This view is looking through the docking window of the Lunar Module. The cloud-covered Earth can be seen in the background. Inside the Lunar Module "Spider" were Astronauts James A. McDivitt, Apollo 9 commander; and Russell L. Schweickart, lunar module pilot. At this moment Apollo 9 was orbiting Earth with the Command and Service Modules docked nose-to-nose with the Lunar Module. Astronaut David R. Scott, command module pilot, remained at the controls in the Command Module "Gumdrop" while the other two astronauts checked out the Lunar Module. McDivitt and Schweickart moved into the Lunar Module from the Command Module by way of the docking tunnel.

  7. ISS Expedition 54-55 Docking, Hatch Opening and Welcome Activities

    NASA Image and Video Library

    2017-12-19

    After launching Dec. 17 in their Soyuz MS-07 spacecraft from the Baikonur Cosmodrome in Kazakhstan, Expedition 54-55 Soyuz Commander Anton Shkaplerov of Roscosmos and Flight Engineers Scott Tingle of NASA and Norishige Kanai of the Japan Aerospace Exploration Agency (JAXA) arrived at the International Space Station Dec. 19 to complete a two-day journey, docking their vehicle to the Rassvet module on the Russian segment of the complex. A few hours after docking their Soyuz MS-07 spacecraft to the International Space Station, Expedition 54-55 Soyuz Commander Anton Shkaplerov of Roscosmos and Flight Engineers Scott Tingle of NASA and Norishige Kanai of the Japan Aerospace Exploration Agency (JAXA), opened hatches and were greeted by station Commander Alexander Misurkin of Roscosmos and Flight Engineers Joe Acaba and Mark Vande Hei of NASA.

  8. Whitson in her TeSS in the Destiny U.S. Lab during STS-111 UF-2 docked OPS

    NASA Image and Video Library

    2002-06-09

    STS111-E-5122 (9 June 2002) --- Astronaut Peggy A. Whitson, Expedition Five flight engineer, was photographed in the doorway of the Temporary Sleep Station (TSS) in the Destiny laboratory on International Space Station (ISS).

  9. Inverse simulation system for evaluating handling qualities during rendezvous and docking

    NASA Astrophysics Data System (ADS)

    Zhou, Wanmeng; Wang, Hua; Thomson, Douglas; Tang, Guojin; Zhang, Fan

    2017-08-01

    The traditional method used for handling qualities assessment of manned space vehicles is too time-consuming to meet the requirements of an increasingly fast design process. In this study, a rendezvous and docking inverse simulation system to assess the handling qualities of spacecraft is proposed using a previously developed model-predictive-control architecture. By considering the fixed discrete force of the thrusters of the system, the inverse model is constructed using the least squares estimation method with a hyper-ellipsoidal restriction, the continuous control outputs of which are subsequently dispersed by pulse width modulation with sensitivity factors introduced. The inputs in every step are deemed constant parameters, and the method could be considered as a general method for solving nominal, redundant, and insufficient inverse problems. The rendezvous and docking inverse simulation is applied to a nine-degrees-of-freedom platform, and a novel handling qualities evaluation scheme is established according to the operation precision and astronauts' workload. Finally, different nominal trajectories are scored by the inverse simulation and an established evaluation scheme. The scores can offer theoretical guidance for astronaut training and more complex operation missions.

  10. [Supercomputer investigation of the protein-ligand system low-energy minima].

    PubMed

    Oferkin, I V; Sulimov, A V; Katkova, E V; Kutov, D K; Grigoriev, F V; Kondakova, O A; Sulimov, V B

    2015-01-01

    The accuracy of the protein-ligand binding energy calculations and ligand positioning is strongly influenced by the choice of the docking target function. This work demonstrates the evaluation of the five different target functions used in docking: functions based on MMFF94 force field and functions based on PM7 quantum-chemical method accounting or without accounting the implicit solvent model (PCM, COSMO or SGB). For these purposes the ligand positions corresponding to the minima of the target function and the experimentally known ligand positions in the protein active site (crystal ligand positions) were compared. Each function was examined on the same test-set of 16 protein-ligand complexes. The new parallelized docking program FLM based on Monte Carlo search algorithm was developed to perform the comprehensive low-energy minima search and to calculate the protein-ligand binding energy. This study demonstrates that the docking target function based on the MMFF94 force field can be used to detect the crystal or near crystal positions of the ligand by the finding the low-energy local minima spectrum of the target function. The importance of solvent accounting in the docking process for the accurate ligand positioning is also shown. The accuracy of the ligand positioning as well as the correlation between the calculated and experimentally determined protein-ligand binding energies are improved when the MMFF94 force field is substituted by the new PM7 method with implicit solvent accounting.

  11. Approach range and velocity determination using laser sensors and retroreflector targets

    NASA Technical Reports Server (NTRS)

    Donovan, William J.

    1991-01-01

    A laser docking sensor study is currently in the third year of development. The design concept is considered to be validated. The concept is based on using standard radar techniques to provide range, velocity, and bearing information. Multiple targets are utilized to provide relative attitude data. The design requirements were to utilize existing space-qualifiable technology and require low system power, weight, and size yet, operate from 0.3 to 150 meters with a range accuracy greater than 3 millimeters and a range rate accuracy greater than 3 mm per second. The field of regard for the system is +/- 20 deg. The transmitter and receiver design features a diode laser, microlens beam steering, and power control as a function of range. The target design consists of five target sets, each having seven 3-inch retroreflectors, arranged around the docking port. The target map is stored in the sensor memory. Phase detection is used for ranging, with the frequency range-optimized. Coarse bearing measurement is provided by the scanning system (one set of binary optics) angle. Fine bearing measurement is provided by a quad detector. A MIL-STD-1750 A/B computer is used for processing. Initial test results indicate a probability of detection greater than 99 percent and a probability of false alarm less than 0.0001. The functional system is currently at the MIT/Lincoln Lab for demonstration.

  12. KSC-97PC844

    NASA Image and Video Library

    1997-05-24

    Framed by the Vehicle Assembly Building in the distance, at left, and the Mate-Demate Device, the Space Shuttle Atlantis with its drag chute deployed touches down on KSC’s Runway 33 at the conclusion of the STS-84 mission. The Shuttle Training Aircraft with astronaut Kenneth D. Cockrell at the controls is flying in front of Atlantis. Cockrell is acting deputy chief of the Astronaut Office. Main gear touchdown was at 9:27:44 EDT on May 24, 1997. The first landing opportunity was waved off because of low cloud cover. It was the 37th landing at KSC since the Shuttle program began in 1981, and the eighth consecutive landing at KSC. STS-84 was the sixth of nine planned dockings of the Space Shuttle with the Russian Space Station Mir. Atlantis was docked with the Mir for five days. STS-84 Mission Specialist C. Michael Foale replaced astronaut and Mir 23 crew member Jerry M. Linenger, who has been on the Russian space station since Jan. 15. Linenger returned to Earth on Atlantis with the rest of the STS-84 crew, Mission Commander Charles J. Precourt, Pilot Eileen Marie Collins, and Mission Specialists Carlos I. Noriega, Edward Tsang Lu, Elena V. Kondakova of the Russian Space Agency and Jean-Francois Clervoy of the European Space Agency. Foale is scheduled to remain on the Mir for approximately four months, until he is replaced by STS-86 crew member Wendy B. Lawrence in September. Besides the docking and crew exchange, STS-84 included the transfer of more than 7,300 pounds of water, logistics and science experiments and hardware to and from the Mir. Scientific experiments conducted during the STS-84 mission, and scheduled for Foale’s stay on the Mir, are in the fields of advanced technology, Earth sciences, fundamental biology, human life sciences, International Space Station risk mitigation, microgravity sciences and space sciences

  13. MS Lucid places samples in the TEHOF aboard the Spektr module

    NASA Image and Video Library

    1997-03-26

    STS079-S-082 (16-26 Sept. 1996) --- Cosmonaut guest researcher Shannon W. Lucid and Valeri G. Korzun, her Mir-22 commander, are pictured on the Spektr Module aboard Russia's Earth-orbiting Mir Space Station. Korzun was the third of four commanders that Lucid served with during her record-setting 188 consecutive days in space. Later, Lucid returned to Earth with her fourth commander-astronaut William F. Readdy-and five other NASA astronauts to complete the STS-79 mission. During the STS-79 mission, the crew used an IMAX camera to document activities aboard the space shuttle Atlantis and the various Mir modules. A hand-held version of the 65mm camera system accompanied the STS-79 crew into space in Atlantis' crew cabin. NASA has flown IMAX camera systems on many Shuttle missions, including a special cargo bay camera's coverage of other recent Shuttle-Mir rendezvous and/or docking missions.

  14. Pharmacophore modeling, virtual screening and molecular docking of ATPase inhibitors of HSP70.

    PubMed

    Sangeetha, K; Sasikala, R P; Meena, K S

    2017-10-01

    Heat shock protein 70 is an effective anticancer target as it influences many signaling pathways. Hence the study investigated the important pharmacophore feature required for ATPase inhibitors of HSP70 by generating a ligand based pharmacophore model followed by virtual based screening and subsequent validation by molecular docking in Discovery studio V4.0. The most extrapolative pharmacophore model (hypotheses 8) consisted of four hydrogen bond acceptors. Further validation by external test set prediction identified 200 hits from Mini Maybridge, Drug Diverse, SCPDB compounds and Phytochemicals. Consequently, the screened compounds were refined by rule of five, ADMET and molecular docking to retain the best competitive hits. Finally Phytochemical compounds Muricatetrocin B, Diacetylphiladelphicalactone C, Eleutheroside B and 5-(3-{[1-(benzylsulfonyl)piperidin-4-yl]amino}phenyl)- 4-bromo-3-(carboxymethoxy)thiophene-2-carboxylic acid were obtained as leads to inhibit the ATPase activity of HSP70 in our findings and thus can be proposed for further in vitro and in vivo evaluation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  15. MISSION CONTROL CENTER (MCC) - APOLLO-SOYUZ TEST PROJECT (ASTP) - JSC

    NASA Image and Video Library

    1975-07-17

    S75-28683 (17 July 1975) --- An overall view of the Mission Operations Control Room in the Mission Control Center during the joint U.S.-USSR Apollo-Soyuz Test Project docking mission in Earth orbit. M.P. Frank, the American senior ASTP flight director, is seated at his console in the right foreground. He is watching the large television monitor which shows a view of the Soyuz spacecraft as seen from the Apollo spacecraft during rendezvous and docking maneuvers.

  16. Apollo-Soyuz US-USSR joint mission results

    NASA Technical Reports Server (NTRS)

    Bean, A. L.; Evans, R. E.

    1975-01-01

    The technical and nontechnical objectives of the Apollo-Soyuz mission are briefly considered. The mission demonstrated that Americans and Russians can work together to perform a very complex operation, including rendezvous in space, docking, and the conduction of joint experiments. Certain difficulties which had to be overcome were partly related to differences concerning the role of the astronaut in the basic alignment and docking procedures for space vehicles. Attention is also given to the experiments conducted during the mission and the approach used to overcome the language barrier.

  17. 7. VIEW NORTHWEST OF 'ISLAND' (TOWER OR SUPERSTRUCTURE) ON THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. VIEW NORTHWEST OF 'ISLAND' (TOWER OR SUPERSTRUCTURE) ON THE DECK OF THE AIRCRAFT CARRIER JOHN F. KENNEDY. WHEN THE PHOTOGRAPH WAS TAKEN IN SEPTEMBER 1994, THE KENNEDY WAS IN DRY-DOCK FOR REFURBISHMENT UNDER THE 'SERVICE LIFE EXTENSION PROGRAM (SLEP). THE 'ISLAND' HOUSES THE SHIP'S BRIDGE AND A CONTROL CENTER FOR AIRCRAFT OPERATIONS. EXTENSIVE SCAFFOLDING WAS REQUIRED TO ALLOW FULL ACCESS TO THE PAINTERS AND TECHNICIANS WORKING HERE. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Dry Dock No. 5, League Island, Philadelphia, Philadelphia County, PA

  18. MS Morukov prepares Zvezda for habitation during STS-106

    NASA Image and Video Library

    2000-09-13

    S106-E-5173 (13 September 2000) --- Cosmonaut Boris V. Morukov, mission specialist representing the Russian Aviation and Space Agency, is part of the team effort to ready the International Space Station (ISS) for permanent habitation. The STS-106 astronauts and cosmonauts are continuing electrical work and transfer activities as they near the halfway point of docked operations with the International Space Station. In all, the crew will have 189 hours, 40 minutes of planned Atlantis-ISS docked time.

  19. Commander Wilcutt poses for a photo on Zvezda during STS-106

    NASA Image and Video Library

    2000-09-13

    S106-E-5192 (13 September 2000) --- Astronaut Terrence W. Wilcutt, mission commander, displays a pleasant countenance onboard the International Space Station as the crew nears the halfway point of docked operations with the International Space Station. In all the crew will have 189 hours, 40 minutes of planned Atlantis-ISS docked time. For most of the remainder of the time until the Atlantis undocks from the ISS, the STS-106 astronauts and cosmonauts continue electrical work and transfer activities.

  20. Skylab checkout operations. [from multiple docking adapter contractor viewpoint

    NASA Technical Reports Server (NTRS)

    Timmons, K. P.

    1973-01-01

    The Skylab Program at Kennedy Space Center presented many opportunities for interesting and profound test and checkout experience. It also offered a compilation of challenges and promises for the Center and for the contractors responsible for the various modules making up Skylab. It is very probable that the various contractors had common experiences during the module and combined systems tests, but this paper will discuss those experiences from the viewpoint of the Multiple Docking Adapter contractor. The experience will consider personnel, procedures, and hardware.

  1. The Four-Day School Week: Impact on Student Academic Performance

    ERIC Educational Resources Information Center

    Hewitt, Paul M.; Denny, George S.

    2011-01-01

    Although the four-day school week originated in 1936, it was not widely implemented until 1973 when there was a need to conserve energy and reduce operating costs. This study investigated how achievement tests scores of schools with a four-day school week compared with schools with a traditional five-day school week. The study focused on student…

  2. Multi-Sensor Testing for Automated Rendezvous and Docking Sensor Testing at the Flight Robotics Laboratory

    NASA Technical Reports Server (NTRS)

    Brewster, L.; Johnston, A.; Howard, R.; Mitchell, J.; Cryan, S.

    2007-01-01

    The Exploration Systems Architecture defines missions that require rendezvous, proximity operations, and docking (RPOD) of two spacecraft both in Low Earth Orbit (LEO) and in Low Lunar Orbit (LLO). Uncrewed spacecraft must perform automated and/or autonomous rendezvous, proximity operations and docking operations (commonly known as AR&D). The crewed missions may also perform rendezvous and docking operations and may require different levels of automation and/or autonomy, and must provide the crew with relative navigation information for manual piloting. The capabilities of the RPOD sensors are critical to the success of the Exploration Program. NASA has the responsibility to determine whether the Crew Exploration Vehicle (CEV) contractor proposed relative navigation sensor suite will meet the requirements. The relatively low technology readiness level of AR&D relative navigation sensors has been carried as one of the CEV Project's top risks. The AR&D Sensor Technology Project seeks to reduce the risk by the testing and analysis of selected relative navigation sensor technologies through hardware-in-the-loop testing and simulation. These activities will provide the CEV Project information to assess the relative navigation sensors maturity as well as demonstrate test methods and capabilities. The first year of this project focused on a series of"pathfinder" testing tasks to develop the test plans, test facility requirements, trajectories, math model architecture, simulation platform, and processes that will be used to evaluate the Contractor-proposed sensors. Four candidate sensors were used in the first phase of the testing. The second phase of testing used four sensors simultaneously: two Marshall Space Flight Center (MSFC) Advanced Video Guidance Sensors (AVGS), a laser-based video sensor that uses retroreflectors attached to the target vehicle, and two commercial laser range finders. The multi-sensor testing was conducted at MSFC's Flight Robotics Laboratory (FRL) using the FRL's 6-DOF gantry system, called the Dynamic Overhead Target System (DOTS). The target vehicle for "docking" in the laboratory was a mockup that was representative of the proposed CEV docking system, with added retroreflectors for the AVGS. The multi-sensor test configuration used 35 open-loop test trajectories covering three major objectives: (1) sensor characterization trajectories designed to test a wide range of performance parameters; (2) CEV-specific trajectories designed to test performance during CEV-like approach and departure profiles; and (3) sensor characterization tests designed for evaluating sensor performance under more extreme conditions as might be induced during a spacecraft failure or during contingency situations. This paper describes the test development, test facility, test preparations, test execution, and test results of the multi-sensor series of trajectories.

  3. C2 Domain of Protein Kinase Cα: Elucidation of the Membrane Docking Surface by Site-Directed Fluorescence and Spin Labeling†

    PubMed Central

    Kohout, Susy C.; Corbalán-García, Senena; Gómez-Fernández, Juan C.; Falke, Joseph J.

    2013-01-01

    The C2 domain is a conserved signaling motif that triggers membrane docking in a Ca2+-dependent manner, but the membrane docking surfaces of many C2 domains have not yet been identified. Two extreme models can be proposed for the docking of the protein kinase Cα (PKCα) C2 domain to membranes. In the parallel model, the membrane-docking surface includes the Ca2+ binding loops and an anion binding site on β-strands 3–4, such that the β-strands are oriented parallel to the membrane. In the perpendicular model, the docking surface is localized to the Ca2+ binding loops and the β-strands are oriented perpendicular to the membrane surface. The present study utilizes site-directed fluorescence and spin-labeling to map out the membrane docking surface of the PKCα C2 domain. Single cysteine residues were engineered into 18 locations scattered over all regions of the protein surface, and were used as attachment sites for spectroscopic probes. The environmentally sensitive fluorescein probe identified positions where Ca2+ activation or membrane docking trigger measurable fluorescence changes. Ca2+ binding was found to initiate a global conformational change, while membrane docking triggered the largest fluorescein environmental changes at labeling positions on the three Ca2+ binding loops (CBL), thereby localizing these loops to the membrane docking surface. Complementary EPR power saturation measurements were carried out using a nitroxide spin probe to determine a membrane depth parameter, Φ, for each spin-labeled mutant. Positive membrane depth parameters indicative of membrane insertion were found for three positions, all located on the Ca2+ binding loops: N189 on CBL 1, and both R249 and R252 on CBL 3. In addition, EPR power saturation revealed that five positions near the anion binding site are partially protected from collisions with an aqueous paramagnetic probe, indicating that the anion binding site lies at or near the surface of the headgroup layer. Together, the fluorescence and EPR results indicate that the Ca2+ first and third Ca2+ binding loops insert directly into the lipid headgroup region of the membrane, and that the anion binding site on β-strands 3–4 lies near the headgroups. The data support a model in which the β-strands are tilted toward the parallel orientation relative to the membrane surface. PMID:12564928

  4. STS-86 Mission Specialist Wolf and friend visit LC 39A on L-1

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-86 Mission Specialist David A. Wolf waves to family members, friends and other well-wishers during a brief visit to Launch Pad 39A the day before the scheduled Sept. 25 launch aboard the Space Shuttle Atlantis. STS-86 is slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. Wolf will be making his second spaceflight. After the docking, Wolf is scheduled to become a member of the Mir 24 crew, replacing U.S. astronaut C. Michael Foale. Wolf would remain on the Mir for about four months. Foale, who has been on the Mir since the STS- 84 mission in mid-May, will return to Earth with the remaining six members of the STS-86 crew at the end of the planned 10-day flight.

  5. STS-86 Mission Specialist Wolf visits LC 39A on L-1

    NASA Technical Reports Server (NTRS)

    1997-01-01

    STS-86 Mission Specialist David A. Wolf waves to family members, friends and other well-wishers during a brief visit to Launch Pad 39A the day before the scheduled Sept. 25 launch aboard the Space Shuttle Atlantis. STS-86 is slated to be the seventh docking of the Space Shuttle with the Russian Space Station Mir. Wolf will be making his second spaceflight. After the docking, Wolf is scheduled to become a member of the Mir 24 crew, replacing U.S. astronaut C. Michael Foale. Wolf would remain on the Mir for about four months. Foale, who has been on the Mir since the STS- 84 mission in mid-May, will return to Earth with the remaining six members of the STS-86 crew at the end of the planned 10-day flight.

  6. Acute and subacute antidiabetic studies of ENP-9, a new 1,5-diarylpyrazole derivative.

    PubMed

    Hernández-Vázquez, Eduardo; Young-Peralta, Sandra; Cerón-Romero, Litzia; García-Jiménez, Sara; Estrada-Soto, Samuel

    2018-05-17

    To explore the antihyperglycaemic and antidiabetic effects and to determine the acute toxicity of 5-(4-chlorophenyl)-1-(2,4-dichloro-phenyl)-4-methyl-N-(piperidin-1-yl)-1H-pyrazole-3-carboxamide (ENP-9). The antihyperglycaemic effect of ENP-9 (50 mg/kg) was determined by oral glucose tolerance test (OGTT). Also, the acute (16, 50 and 160 mg/kg) and subacute (50 mg/kg/day for 10 days) antidiabetic effects of ENP-9 were determined. After subacute treatment, blood samples were analysed to determine glucose and lipid profiles. Also, an acute toxicity determination of ENP-9 was conducted followed the OECD recommendation. Molecular docking was performed using AutoDock 4.2.6 at human cannabinoid receptor 1 (PDB code 5TGZ). Acute Administration of ENP-9 showed significant antidiabetic effect and decreased the maximum OGTT peak, compared to the control group (P < 0.05). Moreover, the 10 days treatment induced a decrease in plasma glucose levels, being significant at the end of the experiments (P < 0.05); however, triacylglycerols and cholesterol were not modified. Finally, LD 50 of ENP-9 was estimated to be greater than 2000 mg/kg. Molecular docking suggests that ENP-9 may act as rimonabant does. ENP-9 showed significant antihyperglycaemic and antidiabetic properties and also was demonstrated to be safety in the studied doses, which might allow future studies for its potential development as antidiabetic agent. © 2018 Royal Pharmaceutical Society.

  7. Satellite Services Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Key issues associated with the orbital servicing of satellites are examined including servicing spacecraft and equipment, servicing operations, economics, satellite design, docking and berthing, and fluid management.

  8. Synthesis, antimalarial activity and molecular docking of hybrid 4-aminoquinoline-1,3,5-triazine derivatives.

    PubMed

    Bhat, Hans Raj; Singh, Udaya Pratap; Thakur, Anjali; Kumar Ghosh, Surajit; Gogoi, Kabita; Prakash, Anil; Singh, Ramendra K

    2015-10-01

    A series of novel hybrid 4-aminoquinoline 1,3,5-triazine derivatives was synthesized in a five-steps reaction and evaluated for their in vitro antimalarial activity against chloroquine-sensitive (3D7) and chloroquine-resistant (RKL-2) strains of Plasmodium falciparum. Entire synthetic derivatives showed higher antimalarial activity on the sensitive strain while two compounds, viz., 9a and 9c displayed good activity against both the strains of P. falciparum. The observed activity was further substantiated by docking study on both wild and qradruple mutant type P. falciparum dihydrofolate reductase-thymidylate synthase (pf-DHFR-TS). Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Concepts for the evolution of the Space Station Program

    NASA Technical Reports Server (NTRS)

    Michaud, Roger B.; Miller, Ladonna J.; Primeaux, Gary R.

    1986-01-01

    An evaluation is made of innovative but pragmatic waste management, interior and exterior orbital module construction, Space Shuttle docking, orbital repair operation, and EVA techniques applicable to the NASA Space Station program over the course of its evolution. Accounts are given of the Space Shuttle's middeck extender module, an on-orbit module assembly technique employing 'Pringles' stack-transportable conformal panels, a flexible Shuttle/Space Station docking tunnel, an 'expandable dome' for transfer of objects into the Space Station, and a Space Station dual-hatch system. For EVA operations, pressurized bubbles with articulating manipulator arms and EVA hard suits incorporating maneuvering, life support and propulsion capabilities, as well as an EVA gas propulsion system, are proposed. A Space Station ultrasound cleaning system is also discussed.

  10. A Summary of the Rendezvous, Proximity Operations, Docking, and Undocking (RPODU) Lessons Learned from the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) Demonstration System Mission

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.; Carpenter, James R.

    2011-01-01

    The Guidance, Navigation, and Control (GN&C) Technical Discipline Team (TDT) sponsored Dr. J. Russell Carpenter, a Navigation and Rendezvous Subject Matter Expert (SME) from NASA's Goddard Space Flight Center (GSFC), to provide support to the Defense Advanced Research Project Agency (DARPA) Orbital Express (OE) rendezvous and docking flight test that was conducted in 2007. When that DARPA OE mission was completed, Mr. Neil Dennehy, NASA Technical Fellow for GN&C, requested Dr. Carpenter document his findings (lessons learned) and recommendations for future rendezvous missions resulting from his OE support experience. This report captures lessons specifically from anomalies that occurred during one of OE's unmated operations.

  11. Six degree of freedom simulation system for evaluating automated rendezvous and docking spacecraft

    NASA Technical Reports Server (NTRS)

    Rourke, Kenneth H.; Tsugawa, Roy K.

    1991-01-01

    Future logistics supply and servicing vehicles such as cargo transfer vehicles (CTV) must have full 6 degree of freedom (6DOF) capability in order to perform requisite rendezvous, proximity operations, and capture operations. The design and performance issues encountered when developing a 6DOF maneuvering spacecraft are very complex with subtle interactions which are not immediately obvious or easily anticipated. In order to deal with these complexities and develop robust maneuvering spacecraft designs, a simulation system and associated family of tools are used at TRW for generating and validating spacecraft performance requirements and guidance algorithms. An overview of the simulator and tools is provided. These are used by TRW for autonomous rendezvous and docking research projects including CTV studies.

  12. Rendezvous and docking tracker

    NASA Technical Reports Server (NTRS)

    Ray, Art J.; Ross, Susan E.; Deming, Douglas R.

    1986-01-01

    A conceptual solid-state rendezvous and docking tracker (RDT) has been devised for generating range and attitude data for a docking vehicle relative to a target vehicle. Emphasis is placed on the approach of the Orbiter to a link with the Space Station. Three laser illuminators ring the optical axis of the lens a directed toward retroreflectors on the target vehicle. Each retroreflector is equipped with a bandpass filter for a designated illumination frequency. Data are collected sequentially over a 20 deg field of view as the range closes to 100-1000 m. A fourth ranging retroreflector 0.3 m from center is employed during close-in maneuvers. The system provides tracking data on motions with 6 deg of freedom, and furnishes 500 msec updates (to be enhanced to 100 msec) to the operator at a computer console.

  13. A Module for Automatic Dock and Detumble (MADD) for orbital rescue operations

    NASA Technical Reports Server (NTRS)

    Snow, W. R.; Kunciw, B. G.; Kaplan, M. H.

    1973-01-01

    The module for automatic dock and detumble (MADD) is an automated device for bringing a passive, tumbling space base under control in an orbital rescue situation. The conceptual design of such a device resulted from a consideration of tumbling motion analyses and mission constraints. Specific topics of investigation include orbit and attitude dynamics and detumble profiles. Position and attitude control systems for the various phases of operation were developed. Dynamic motion of a passive vehicle with MADD attached is considered as an example application and to determine control requirements. Since time is a critical factor in rescue operations, it is essential to execute the detumbling maneuver in a minimum of time. Optimization of the MADD thrusting sequence has also been investigated. Results indicate the control torque must be directed opposite to the angular momentum vector for the assumption used here.

  14. STS-79 Space Shuttle Mission Report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1996-01-01

    STS-79 was the fourth of nine planned missions to the Russian Mir Space Station. This report summarizes the activities such as rendezvous and docking and spaceborne experiment operations. The report also discusses the Orbiter, External Tank (ET), Solid Rocket Boosters (SRB), Reusable Solid Rocket Motor (RSRM) and the space shuttle main engine (SSME) systems performance during the flight. The primary objectives of this flight were to rendezvous and dock with the Mir Space Station and exchange a Mir Astronaut. A double Spacehab module carried science experiments and hardware, risk mitigation experiments (RME's) and Russian logistics in support of program requirements. Additionally, phase 1 program science experiments were carried in the middeck. Spacehab-05 operations were performed. The secondary objectives of the flight were to perform the operations necessary for the Shuttle Amateur Radio Experiment-2 (SAREX-2). Also, as a payload of opportunity, the requirements of Midcourse Space Experiment (MSX) were completed.

  15. KSC-98pc1753

    NASA Image and Video Library

    1998-12-01

    KENNEDY SPACE CENTER, FLA. -- In the Space Station Processing Facility, Program Manager of the International Space Station (ISS) Randy Brinkley addresses the media before lowering the banner to unveil the name of "Destiny" given the U.S. Lab module, the centerpiece of scientific research on the ISS. With Brinkley on the stand are Center Director Roy Bridges (behind him on the left), and (the other side, left to right) STS-98 Commander Ken Cockrell, Pilot Mark Polansky, and Mission Specialist Marsha Ivins. The lab, which is behind them on a workstand, is scheduled to be launched on Space Shuttle Endeavour in early 2000. It will become the centerpiece of scientific research on the International Space Station. Polansky, Cockrel and Ivins are part of the five-member crew expected to be aboard. The Shuttle will spend six days docked to the station while the laboratory is attached and three space walks are conducted to complete its assembly. The laboratory will be launched with five equipment racks aboard, which will provide essential functions for station systems, including high data-rate communications, and maintain the station's orientation using control gyroscopes launched earlier. Additional equipment and research racks will be installed in the laboratory on subsequent Shuttle flights

  16. Space Shuttle Projects

    NASA Image and Video Library

    1995-06-01

    This image of the Space Shuttle Orbiter Atlantis, with cargo bay doors open showing Spacelab Module for the Spacelab Life Science and the docking port, was photographed from the Russian Mir Space Station during STS-71 mission. The STS-71 mission performed the first docking with the Russian Mir Space Station to exchange crews. The Mir 19 crew, cosmonauts Anatoly Solovyev and Nikolai Budarin, replaced the Mir 18 crew, cosmonauts Valdamir Dezhurov and Gernady Strekalov, and astronaut Norman Thagard. Astronaut Thagard was launched aboard a Soyuz spacecraft in March 1995 for a three-month stay on the Mir Space Station as part of the Mir 18 crew. The Orbiter Atlantis was modified to carry a docking system compatible with the Mir Space Station. The Orbiter also carried a Spacelab module for the Spacelab Life Science mission in the payload bay in which various life science experiments and data collection took place throughout the 10-day mission.

  17. 76 FR 11961 - Safety Zone, Dredging Operations; Delaware River, Marcus Hook, PA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ...-AA00 Safety Zone, Dredging Operations; Delaware River, Marcus Hook, PA AGENCY: Coast Guard, DHS. ACTION... Delaware River while the Dredge Pullen conducts dredging operations at the Sunoco Marcus Hook docks in the vicinity of the Marcus Hook Range near Marcus Hook, PA. This action is necessary to maintain the 42 ft...

  18. STS-115 MS Tanner on Atlantis Middeck

    NASA Image and Video Library

    2006-09-10

    S115-E-05337 (10 Sept. 2006) --- Astronaut Joseph R. Tanner, STS-115 mission specialist, works on the middeck of the Space Shuttle Atlantis on the eve of docking day with the International Space Station.

  19. View of docked Apollo 9 Command/Service Module and Lunar Module

    NASA Image and Video Library

    1969-03-06

    AS09-20-3064 (6 March 1969) --- Excellent view of the docked Apollo 9 Command and Service Modules (CSM) and Lunar Module (LM), with Earth in the background, during astronaut David R. Scott's stand-up extravehicular activity (EVA), on the fourth day of the Apollo 9 Earth-orbital mission. Scott, command module pilot, is standing in the open hatch of the Command Module (CM). Astronaut Russell L. Schweickart, lunar module pilot, took this photograph of Scott from the porch of the LM. Inside the LM was astronaut James A. McDivitt, Apollo 9 commander.

  20. ART CONCEPTS - APOLLO-SOYUZ TEST PROJECT (ASTP)

    NASA Image and Video Library

    1975-04-01

    S75-27288 (April 1975) --- An artist?s concept illustrating the mission profile of the Apollo-Soyuz Test Project. The phases of the mission depicted include launch, rendezvous, docking, separation and splashdown. During the joint U.S.-USSR ASTP flight, scheduled for July 1975, the American and Soviet crews will visit one another?s spacecraft while the Soyuz and Apollo are docked for a maximum period of two days. The mission is designed to test equipment and techniques that will establish international crew rescue capability in space, as well as permit future cooperative scientific missions. This artwork is by Davis Meltzer.

  1. Docking Offset Between the Space Shuttle and the International Space Station and Resulting Impacts to the Transfer of Attitude Reference and Control

    NASA Technical Reports Server (NTRS)

    Helms, W. Jason; Pohlkamp, Kara M.

    2011-01-01

    The Space Shuttle does not dock at an exact 90 degrees to the International Space Station (ISS) x-body axis. This offset from 90 degrees, along with error sources within their respective attitude knowledge, causes the two vehicles to never completely agree on their attitude, even though they operate as a single, mated stack while docked. The docking offset can be measured in flight when both vehicles have good attitude reference and is a critical component in calculations to transfer attitude reference from one vehicle to another. This paper will describe how the docking offset and attitude reference errors between both vehicles are measured and how this information would be used to recover Shuttle attitude reference from ISS in the event of multiple failures. During STS-117, ISS on-board Guidance, Navigation and Control (GNC) computers began having problems and after several continuous restarts, the systems failed. The failure took the ability for ISS to maintain attitude knowledge. This paper will also demonstrate how with knowledge of the docking offset, the contingency procedure to recover Shuttle attitude reference from ISS was reversed in order to provide ISS an attitude reference from Shuttle. Finally, this paper will show how knowledge of the docking offset can be used to speed up attitude control handovers from Shuttle to ISS momentum management. By taking into account the docking offset, Shuttle can be commanded to hold a more precise attitude which better agrees with the ISS commanded attitude such that start up transients with the ISS momentum management controllers are reduced. By reducing start-up transients, attitude control can be transferred from Shuttle to ISS without the use of ISS thrusters saving precious on-board propellant, crew time and minimizing loads placed upon the mated stack.

  2. Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

    NASA Technical Reports Server (NTRS)

    Hinkel, Heather; Cryan, Scott; Zipay, John; Strube, Matthew

    2015-01-01

    This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR&D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR&D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion crew vehicle. The commonality assessment also considered several future exploration and science missions requiring an AR&D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a threedimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build time instead of at design time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal nonrecurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR&D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

  3. Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

    NASA Technical Reports Server (NTRS)

    Hinkel, Heather; Strube, Matthew; Zipay, John J.; Cryan, Scott

    2015-01-01

    This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR and D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR and D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion crew vehicle. The commonality assessment also considered several future exploration and science missions requiring an AR and D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a threedimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build time instead of at design time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal nonrecurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR and D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

  4. Technology Development of Automated Rendezvous and Docking/Capture Sensors and Docking Mechanism for the Asteroid Redirect Crewed Mission

    NASA Technical Reports Server (NTRS)

    Hinkel, Heather; Strube, Matthew; Zipay, John J.; Cryan, Scott

    2016-01-01

    This paper will describe the technology development efforts NASA has underway for Automated Rendezvous and Docking/Capture (AR&D/C) sensors and a docking mechanism and the challenges involved. The paper will additionally address how these technologies will be extended to other missions requiring AR&D/C whether robotic or manned. NASA needs AR&D/C sensors for both the robotic and crewed segments of the Asteroid Redirect Mission (ARM). NASA recently conducted a commonality assessment of the concept of operations for the robotic Asteroid Redirect Vehicle (ARV) and the crewed mission segment using the Orion spacecraft. The commonality assessment also considered several future exploration and science missions requiring an AR&D/C capability. Missions considered were asteroid sample return, satellite servicing, and planetary entry, descent, and landing. This assessment determined that a common sensor suite consisting of one or more visible wavelength cameras, a three-dimensional LIDAR along with long-wavelength infrared cameras for robustness and situational awareness could be used on each mission to eliminate the cost of multiple sensor developments and qualifications. By choosing sensor parameters at build-time instead of at design-time and, without having to requalify flight hardware, a specific mission can design overlapping bearing, range, relative attitude, and position measurement availability to suit their mission requirements with minimal non-recurring engineering costs. The resulting common sensor specification provides the union of all performance requirements for each mission and represents an improvement over the current systems used for AR&D/C today. These sensor specifications are tightly coupled to the docking system capabilities and requirements for final docking conditions. The paper will describe NASA's efforts to develop a standard docking system for use across NASA human spaceflight missions to multiple destinations. It will describe the current design status and the considerations and technologies involved in developing this docking mechanism.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aegerter, P.A.

    Phillips Petroleum Company scientists and engineers have been operating petroleum refining and separations pilot plants for five years in the Process Development Center. The 26 pilot plants in this building, with one exception, operate under complete computer-control, allowing maximum utilization of limited operating manpower. This centralization and automation of pilot plants has allowed Phillips to more than double the number of operating pilot plants in the petroleum refining area without an increase in manpower. At the same time, the quantity and quality of data has increased correspondingly. This paper discusses Phillips philosophy of operation and management of these pilot plants.more » In addition, details of day-to-day operations and a brief description of the control system are also presented.« less

  6. Protein–protein docking by fast generalized Fourier transforms on 5D rotational manifolds

    PubMed Central

    Padhorny, Dzmitry; Kazennov, Andrey; Zerbe, Brandon S.; Porter, Kathryn A.; Xia, Bing; Mottarella, Scott E.; Kholodov, Yaroslav; Ritchie, David W.; Vajda, Sandor; Kozakov, Dima

    2016-01-01

    Energy evaluation using fast Fourier transforms (FFTs) enables sampling billions of putative complex structures and hence revolutionized rigid protein–protein docking. However, in current methods, efficient acceleration is achieved only in either the translational or the rotational subspace. Developing an efficient and accurate docking method that expands FFT-based sampling to five rotational coordinates is an extensively studied but still unsolved problem. The algorithm presented here retains the accuracy of earlier methods but yields at least 10-fold speedup. The improvement is due to two innovations. First, the search space is treated as the product manifold SO(3)×(SO(3)∖S1), where SO(3) is the rotation group representing the space of the rotating ligand, and (SO(3)∖S1) is the space spanned by the two Euler angles that define the orientation of the vector from the center of the fixed receptor toward the center of the ligand. This representation enables the use of efficient FFT methods developed for SO(3). Second, we select the centers of highly populated clusters of docked structures, rather than the lowest energy conformations, as predictions of the complex, and hence there is no need for very high accuracy in energy evaluation. Therefore, it is sufficient to use a limited number of spherical basis functions in the Fourier space, which increases the efficiency of sampling while retaining the accuracy of docking results. A major advantage of the method is that, in contrast to classical approaches, increasing the number of correlation function terms is computationally inexpensive, which enables using complex energy functions for scoring. PMID:27412858

  7. STS-92 M.S. Koichi Wakata suits up for launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    During suitup in the Operations and Checkout Building, STS-92 Mission Specialist Koichi Wakata of Japan signals thumbs up for a second launch attempt. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Launch is scheduled for 7:17 p.m. EDT. Landing is expected Oct. 22 at 2:10 p.m. EDT.

  8. STS-92 M.S. Jeff Wisoff suits up for launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    During suitup in the Operations and Checkout Building, STS-92 Mission Specialist Peter J.K. '''Jeff''' Wisoff signals thumbs up for a second launch attempt. During the 11-day mission to the International Space Station, four extravehicular activities (EVAs), or spacewalks, are planned for construction. The payload includes the Integrated Truss Structure Z-1 and the third Pressurized Mating Adapter. The Z-1 truss is the first of 10 that will become the backbone of the Space Station, eventually stretching the length of a football field. PMA-3 will provide a Shuttle docking port for solar array installation on the sixth Station flight and Lab installation on the seventh Station flight. Launch is scheduled for 7:17 p.m. EDT. Landing is expected Oct. 22 at 2:10 p.m. EDT.

  9. KSC-98pc1854

    NASA Image and Video Library

    1998-12-15

    In the Space Station Processing Facility, a worker (left) guides the lifting of solar panels for the International Space Station (ISS). The panels are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of the Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend 5 days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed

  10. Solar panels for the International Space Station are uncrated and moved in the SSPF

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Solar panels for the International Space Station (ISS) are uncrated in the Space Station Processing Facility. They are the first set of U.S.-provided solar arrays and batteries for ISS, scheduled to be part of mission STS-97 in December 1999. The mission, fifth in the U.S. flights for construction of ISS, will build and enhance the capabilities of Space Station. It will deliver the solar panels as well as radiators to provide cooling. The Shuttle will spend 5 days docked to the station, which at that time will be staffed by the first station crew. Two space walks will be conducted to complete assembly operations while the arrays are attached and unfurled. A communications system for voice and telemetry also will be installed.

  11. In silico studies and fluorescence binding assays of potential anti-prion compounds reveal an important binding site for prion inhibition from PrP(C) to PrP(Sc).

    PubMed

    Pagadala, Nataraj S; Perez-Pineiro, Rolando; Wishart, David S; Tuszynski, Jack A

    2015-02-16

    To understand the pharmacophore properties of 2-aminothiazoles and design novel inhibitors against the prion protein, a highly predictive 3D quantitative structure-activity relationship (QSAR) has been developed by performing comparative molecular field analysis (CoMFA) and comparative similarity analysis (CoMSIA). Both CoMFA and CoMSIA maps reveal the presence of the oxymethyl groups in meta and para positions on the phenyl ring of compound 17 (N-[4-(3,4-dimethoxyphenyl)-1,3-thiazol-2-yl]quinolin-2-amine), is necessary for activity while electro-negative nitrogen of quinoline is highly favorable to enhance activity. The blind docking results for these compounds show that the compound with quinoline binds with higher affinity than isoquinoline and naphthalene groups. Out of 150 novel compounds retrieved using finger print analysis by pharmacophoric model predicted based on five test sets of compounds, five compounds with diverse scaffolds were selected for biological evaluation as possible PrP inhibitors. Molecular docking combined with fluorescence quenching studies show that these compounds bind to pocket-D of SHaPrP near Trp145. The new antiprion compounds 3 and 6, which bind with the interaction energies of -12.1 and -13.2 kcal/mol, respectively, show fluorescence quenching with binding constant (Kd) values of 15.5 and 44.14 μM, respectively. Further fluorescence binding assays with compound 5, which is similar to 2-aminothiazole as a positive control, also show that the molecule binds to the pocket-D with the binding constant (Kd) value of 84.7 μM. Finally, both molecular docking and a fluorescence binding assay of noscapine as a negative control reveals the same binding site on the surface of pocket-A near a rigid loop between β2 and α2 interacting with Arg164. This high level of correlation between molecular docking and fluorescence quenching studies confirm that these five compounds are likely to act as inhibitors for prion propagation while noscapine might act as a prion accelerator from PrP(C) to PrP(Sc). Copyright © 2014 Elsevier Masson SAS. All rights reserved.

  12. KSC-97PC1352

    NASA Image and Video Library

    1997-09-09

    STS-86 crew members get a ride in, and learn to operate, an M-113 armored personnel carrier as part of training exercises during the Terminal Countdown Demonstration Test (TCDT), a dress rehearsal for launch. George Hoggard, in back at left, a training officer with KSC Fire Services, provides this part of the training to Mission Specialists Wendy B. Lawrence, to the right of Hoggard; Vladimir Georgievich Titov of the Russian Space Agency; and Scott E. Parazynski. STS-86 will be the seventh docking of the Space Shuttle with the Russian Space Station Mir. During the docking, Titov and Parazynski are scheduled to conduct a spacewalk primarily to retrieve four suitcase-sized environmental payloads from the exterior of the Mir docking module. Also during the mission, STS-86 Mission Specialist David A. Wolf will transfer to the orbiting Russian station and become a member of the Mir 24 crew, replacing U.S. astronaut C. Michael Foale, who has been on the Mir since the last docking mission, STS-84, in May. Launch of Mission STS-86 aboard the Space Shuttle Atlantis is targeted for Sept. 25 from Launch Pad 39A

  13. Gemini Rendezvous Docking Simulator

    NASA Image and Video Library

    1964-05-11

    Gemini Rendezvous Docking Simulator suspended from the roof of the Langley Research Center s aircraft hangar. Francis B. Smith wrote: The rendezvous and docking operation of the Gemini spacecraft with the Agena and of the Apollo Command Module with the Lunar Excursion Module have been the subject of simulator studies for several years. This figure illustrates the Gemini-Agena rendezvous docking simulator at Langley. The Gemini spacecraft was supported in a gimbal system by an overhead crane and gantry arrangement which provided 6 degrees of freedom - roll, pitch, yaw, and translation in any direction - all controllable by the astronaut in the spacecraft. Here again the controls fed into a computer which in turn provided an input to the servos driving the spacecraft so that it responded to control motions in a manner which accurately simulated the Gemini spacecraft. -- Published in Barton C. Hacker and James M. Grimwood, On the Shoulders of Titans: A History of Project Gemini, NASA SP-4203 Francis B. Smith, Simulators for Manned Space Research, Paper presented at the 1966 IEEE International convention, March 21-25, 1966.

  14. ATV during Demonstration Day 2 Rendezvous Test

    NASA Image and Video Library

    2008-03-31

    ISS016-E-034191 (31 March 2008) --- Backdropped by the airglow of Earth's horizon and the blackness of space, the Jules Verne Automated Transfer Vehicle (ATV) approaches the International Space Station on Monday, March 31, 2008, for its "Demo Day 2" practice maneuvers. It moved to within 36 feet of the Zvezda Service Module in a rehearsal for docking on Thursday.

  15. Earth Observations taken by the STS-135 Crew

    NASA Image and Video Library

    2011-07-09

    S135-E-006265 (9 July 2011) --- A nadir view from the Earth-orbiting space shuttle Atlantis, photographed by one of four STS-135 crewmembers, shows the southernmost part of Italy, referred to as the "boot." The astronauts were on the mission's second day of activity in Earth orbit, and the eve of docking day with the International Space Station. Photo credit: NASA

  16. Vision-based sensing for autonomous in-flight refueling

    NASA Astrophysics Data System (ADS)

    Scott, D.; Toal, M.; Dale, J.

    2007-04-01

    A significant capability of unmanned airborne vehicles (UAV's) is that they can operate tirelessly and at maximum efficiency in comparison to their human pilot counterparts. However a major limiting factor preventing ultra-long endurance missions is that they require landing to refuel. Development effort has been directed to allow UAV's to automatically refuel in the air using current refueling systems and procedures. The 'hose & drogue' refueling system was targeted as it is considered the more difficult case. Recent flight trials resulted in the first-ever fully autonomous airborne refueling operation. Development has gone into precision GPS-based navigation sensors to maneuver the aircraft into the station-keeping position and onwards to dock with the refueling drogue. However in the terminal phases of docking, the accuracy of the GPS is operating at its performance limit and also disturbance factors on the flexible hose and basket are not predictable using an open-loop model. Hence there is significant uncertainty on the position of the refueling drogue relative to the aircraft, and is insufficient in practical operation to achieve a successful and safe docking. A solution is to augment the GPS based system with a vision-based sensor component through the terminal phase to visually acquire and track the drogue in 3D space. The higher bandwidth and resolution of camera sensors gives significantly better estimates on the state of the drogue position. Disturbances in the actual drogue position caused by subtle aircraft maneuvers and wind gusting can be visually tracked and compensated for, providing an accurate estimate. This paper discusses the issues involved in visually detecting a refueling drogue, selecting an optimum camera viewpoint, and acquiring and tracking the drogue throughout a widely varying operating range and conditions.

  17. SRMS Assisted Docking and Undocking for the Orbiter Repair Maneuver

    NASA Technical Reports Server (NTRS)

    Quiocho, Leslie J.; Briscoe, Timothy J.; Schliesing, John A.; Braman, Julia M.

    2005-01-01

    As part of the Orbiter Repair Maneuver (ORM) planned for Return to Flight (RTF) operations, the Shuttle Remote Manipulator System (SRMS) must undock the Orbiter, maneuver it through a complex trajectory at extremely low rates, present it to an EVA crewman at the end of the Space Station Remote Manipulator System to perform the Thermal Protection System (TPS) repair, and then retrace back through the trajectory to dock the Orbiter with the Orbiter Docking System (ODs). The initial and final segments of this operation involve the interaction between the SRMS, ISS, Orbiter and ODs. This paper first provides an overview of the Monte-Carlo screening analysis for the installation (both nominal and contingency), including the variation of separation distance, misalignment conditions, SRMS joint/brake parameter characteristics, and PRCS jet combinations and corresponding thrust durations. The resulting 'optimum' solution is presented based on trade studies between predicted capture success and integrated system loads. This paper then discusses the upgrades to the APAS math model associated with the new SRMS assisted undocking technique and reviews simulation results for various options investigated for either the active and passive separation of the ISS from the Orbiter.

  18. STS-71 Shuttle/Mir mission report

    NASA Technical Reports Server (NTRS)

    Zimpfer, Douglas J.

    1995-01-01

    The performance measurements of the space shuttle on-orbit flight control system from the STS-71 mission is presented in this post-flight analysis report. This system is crucial to the stabilization of large space structures and will be needed during the assembly of the International Space Station A mission overview is presented, including the in-orbit flight tests (pre-docking with Mir) and the systems analysis during the docking and undocking operations. Systems errors and lessons learned are discussed, with possible corrective procedures presented for the upcoming Mir flight tests.

  19. Autonomous Rendezvous and Docking Conference, volume 2

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Autonomous Rendezvous and Docking (ARD) will be a requirement for future space programs. Clear examples include satellite servicing, repair, recovery, and reboost in the near term, and the longer range lunar and planetary exploration programs. ARD will permit more aggressive unmanned space activities, while providing a valuable operational capability for manned missions. The purpose of the conference is to identify the technologies required for an on-orbit demonstration of ARD, assess the maturity of those technologies, and provide the necessary insight for a quality assessment of programmatic management, technical, schedule, and cost risks.

  20. MS Burbank and MS Malenchenko working in Zvezda during STS-106

    NASA Image and Video Library

    2000-09-13

    S106-E-5174 (13 September 2000) --- Cosmonaut Yuri I. Malenchenko (left), representing the Russian Aviation and Space Agency, and astronaut Daniel C. Burbank are part of the team effort to ready the International Space Station (ISS) for permanent habitation. These two mission specialists and the other STS-106 astronauts and cosmonaut are continuing electrical work and transfer activities as they near the halfway point of docked operations with the International Space Station. In all the crew will have 189 hours, 40 minutes of planned Atlantis-ISS docked time.

  1. KSC-2012-4542

    NASA Image and Video Library

    2012-08-17

    CAPE CANAVERAL, Fla. – The solid rocket booster SRB retrieval ships, Liberty Star and Freedom Star, are docked in the Banana River at Cape Canaveral Air Force Station's Hangar A F. The NASA vessels were used during the space shuttle era to retrieve the SRBs following shuttle launches. Kennedy is located on Merritt Island, a barrier island, about 34 miles long and varying in width from five to 10 miles. Only 6,000 acres are actually used for operational activities. The Kennedy Space Center is also a National Wildlife Refuge. Consisting of 140,000 acres, the refuge provides a wide variety of habitats: coastal dunes, saltwater estuaries and marshes, freshwater impoundments, scrub, pine flatwoods and hardwood hammocks providing habitat for more than 1,500 species of plants and animals. For more information, visit: http://ipv6.nasa.gov/centers/kennedy/shuttleoperations/alligators/kscovrv.html Photo credit: NASA/Ben Smegelsky

  2. 76 FR 26182 - Drawbridge Operation Regulations; Hood Canal, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... p.m. to 6 p.m. every day of the week from 3 p.m. May 27, 2011 through 6 p.m. on September 30, 2011... test for both navigation and road traffic. From 3 p.m. to 6 p.m. every day from 3 p.m. on May 27... only five days with more than one opening per day. July 2010 was busier than June. In July 43 openings...

  3. Destabilization of the metal site as a hub for the pathogenic mechanism of five ALS-linked mutants of copper, zinc superoxide dismutase.

    PubMed

    Mera-Adasme, Raúl; Erdmann, Hannes; Bereźniak, Tomasz; Ochsenfeld, Christian

    2016-10-01

    Amyotrophic lateral sclerosis (ALS) is a lethal neurodegenerative disease, with no effective pharmacological treatment. Its pathogenesis is unknown, although a subset of the cases is linked to genetic mutations. A significant fraction of the mutations occur in one protein, copper, zinc superoxide dismutase (SOD1). The toxic function of mutant SOD1 has not been elucidated, but damage to the metal site of the protein is believed to play a major role. In this work, we study the electrostatic loop of SOD1, which we had previously proposed to work as a "solvent seal" isolating the metal site from water molecules. Out of the five contact points identified between the electrostatic loop and its dock in the rest of the protein, three points were found to be affected by ALS-linked mutations, with a total of five mutations identified. The effect of the five mutations was studied using methods of computational chemistry. We found that four of the mutations destabilize the proposed solvent seal, while the fifth mutation directly affects the metal-site stability. In the two contact points unaffected by ALS-linked mutations, the side chains of the residues were not found to play a stabilizing role. Our results show that the docking of the electrostatic loop to the rest of SOD1 plays a role in ALS pathogenesis, in support of that structure acting as a solvent barrier for the metal site. The results provide a unified pathogenic mechanism for five different ALS-linked mutations of SOD1.

  4. Isolates of Alpinia officinarum Hance as COX-2 inhibitors: Evidence from anti-inflammatory, antioxidant and molecular docking studies.

    PubMed

    Honmore, Varsha S; Kandhare, Amit D; Kadam, Parag P; Khedkar, Vijay M; Sarkar, Dhiman; Bodhankar, Subhash L; Zanwar, Anand A; Rojatkar, Supada R; Natu, Arun D

    2016-04-01

    Inflammation triggered by oxidative stress can cause various ailments, such as cancer, rheumatoid arthritis, asthma, diabetes etc. In the last few years, there has been a renewed interest in studying the antioxidant and anti-inflammatory action of plant constituents such as flavonoids and diarylheptanoids. To evaluate the antioxidant, anti-inflammatory activity and the total phenolic content of isolated compounds from Alpinia officinarum rhizomes. Furthermore, molecular docking was performed to study the binding mode of these compounds into the active site of cyclooxygenase-2 (COX-2). A. officinarum rhizomes were extracted by maceration, using methanol. This extract was further fractionated by partitioning with hexane, chloroform and ethyl acetate and these fractions on further purification resulted in isolation of five pure compounds. Characterization was carried out by using (1)H NMR, (13)C NMR and MS. They were further evaluated for antioxidant and anti-inflammatory activity using carrageenan-induced paw edema model in rats. Molecular docking study was performed using Glide module integrated in Schrodinger molecular modeling software. The compounds were identified as 1,7-diphenylhept-4-en-3-one (1), 5-hydroxy-1,7-diphenyl-3-heptanone (2), 3,5,7-trihydroxyflavone (Galangin, 3), 3,5,7-trihydroxy-4'-methoxyflavone (Kaempferide, 4) and 5-hydroxy-7-(4″-hydroxy-3″-methoxyphenyl)-1-phenyl-3-heptanone (5). The compound-3 and compound-5 (10mg/kg) showed significant (p<0.001) antioxidant and anti-inflammatory potential. Moreover, total phenolic content was detected as 72.96 mg and 51.18 mg gallic acid equivalent respectively. All the five isolates were found to be good binders with COX-2 (average docking score -9.03). Galangin and 5-hydroxy-7-(4″-hydroxy-3″-methoxyphenyl)-1-phenyl-3-heptanone exhibited anti-inflammatory and in-vitro antioxidant activity which may be due to presence of phenolic content in it. The molecular docking study revealed that these compounds have affinity towards COX-2 active site which can further be explored as selective COX-2 inhibitors. The results obtained in this work justify the use of A. officinarum in the treatment of inflammatory disorders like rheumatoid arthritis and inflammatory bowel diseases. Copyright © 2016 Elsevier B.V. All rights reserved.

  5. [Clinical research about the consecutive pain and flubiprofen axetil analgesia following uvulopalatopharyngoplasty].

    PubMed

    Zhao, Y Q; Wang, H M; Ma, Y; Yang, H A; Jiang, X J

    2017-04-05

    Objective: To evaluate the postoperative pain degree on OSAHS patients following UPPP, analyze the pain characteristic during seven consecutive days, and discuss the mechanism. To observe the analgesia effect by using flubiprofen axetil. Finally making a comprehensive understanding about UPPP perioperative period and providing more choices about analgesia treatment. Method: Fifty-five patients who underwent UPPP in the First Hospital of China Medical University were divided into analgesia group(n=30)and control group(n=25).Normal saline 50 ml+ flubiprofen axetil 100 mg was used bid for pain relief in analgesia group during seven days following operation, and normal saline 50ml was used in control group.A visual analog scale(VAS) was used for measuring mean pain intensity each day during the period from operative day to the post-operative 7th day,scores were recorded. Continuous changes about pharynx pain were observed and VAS pain scores were compared betweenanalgesia groupand control group. Result: VAS pain scores were the highest on the operative day and the post-operative 1st day, median (interquartile range) was 7(5.5-8.25),7(6-8)respectively,then decreased gradually. The most significantly decrease happened on the post-operative 2nd and 5th day( P <0.01). Pain scores in analgesia group were most significantly lower than control group from the operative day to the post-operative 4th day( P <0.01), were lower during the post-operative 5th and 6th day( P <0.05),no difference on the post-operative 7th day. Conclusion: The most painful period following UPPP is from the operative day to the post-operative 1st day, then pain decreases gradually. The pain reduces significantly on the post-operative 2nd and 5,6th day.Surgical trauma, in flammatory reaction and suture pulling may be the reason of pain. Flubiprofen axetil effectively reduces pain and the suggested analgesia period is from the operative day to the post-operative 4th-6th day. Copyright© by the Editorial Department of Journal of Clinical Otorhinolaryngology Head and Neck Surgery.

  6. 47 CFR 76.975 - Commercial leased access dispute resolution.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cable operator's maximum permitted rate from an independent accountant prior to filing a petition for... days to agree on a mutually acceptable accountant from the date on which the programmer provides the... agree on a mutually acceptable accountant within five business days of the programmer's request for a...

  7. 47 CFR 76.975 - Commercial leased access dispute resolution.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cable operator's maximum permitted rate from an independent accountant prior to filing a petition for... days to agree on a mutually acceptable accountant from the date on which the programmer provides the... agree on a mutually acceptable accountant within five business days of the programmer's request for a...

  8. 25 CFR 213.40 - Cancellations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FIVE CIVILIZED TRIBES, OKLAHOMA, FOR MINING Operations § 213.40 Cancellations. (a) When, in the opinion... or of the applicable regulations, or if mining operations are conducted wastefully and without regard to good mining practice, the Secretary of the Interior shall have the right at any time after 30 days...

  9. View of Expedition 24 Crew Members in the MRM2

    NASA Image and Video Library

    2010-09-24

    ISS024-E-015327 (24 Sept. 2010) --- Russian cosmonaut Alexander Skvortsov (right), Expedition 24 commander; NASA astronaut Tracy Caldwell Dyson and Russian cosmonaut Mikhail Kornienko, both flight engineers, pose for a photo during final preparations for their departure in the Soyuz TMA-18 docked to the Poisk Mini-Research Module 2 (MRM2) of the International Space Station. Originally scheduled for Sept. 23, the Soyuz undocked a day later due to a Poisk-side hatch sensor problem, which prevented hooks on the Poisk side of the docking interface from opening. The Soyuz undocked at 10:02 p.m. (EDT) on Sept. 24, 2010.

  10. Gemini Simulator and Neil Armstrong

    NASA Image and Video Library

    1963-11-06

    Astronaut Neil Armstrong (left) was one of 14 astronauts, 8 NASA test pilots, and 2 McDonnell test pilots who took part in simulator studies. Armstrong was the first astronaut to participate (November 6, 1963). A.W. Vogeley described the simulator in his paper "Discussion of Existing and Planned Simulators For Space Research," "Many of the astronauts have flown this simulator in support of the Gemini studies and they, without exception, appreciated the realism of the visual scene. The simulator has also been used in the development of pilot techniques to handle certain jet malfunctions in order that aborts could be avoided. In these situations large attitude changes are sometimes necessary and the false motion cues that were generated due to earth gravity were somewhat objectionable; however, the pilots were readily able to overlook these false motion cues in favor of the visual realism." Roy F. Brissenden, noted in his paper "Initial Operations with Langley's Rendezvous Docking Facility," "The basic Gemini control studies developed the necessary techniques and demonstrated the ability of human pilots to perform final space docking with the specified Gemini-Agena systems using only visual references. ... Results... showed that trained astronauts can effect the docking with direct acceleration control and even with jet malfunctions as long as good visual conditions exist.... Probably more important than data results was the early confidence that the astronauts themselves gained in their ability to perform the maneuver in the ultimate flight mission." Francis B. Smith, noted in his paper "Simulators for Manned Space Research," "Some major areas of interest in these flights were fuel requirements, docking accuracies, the development of visual aids to assist alignment of the vehicles, and investigation of alternate control techniques with partial failure modes. However, the familiarization and confidence developed by the astronaut through flying and safely docking the simulator during these tests was one of the major contributions. For example, it was found that fuel used in docking from 200 feet typically dropped from about 20 pounds to 7 pounds after an astronaut had made a few training flights." -- Published in Barton C. Hacker and James M. Grimwood, On the Shoulders of Titans: A History of Project Gemini, NASA SP-4203; A.W. Vogeley, "Discussion of Existing and Planned Simulators For Space Research," Paper presented at the Conference on the Role of Simulation in Space Technology, August 17-21, 1964; Roy F. Brissenden, "Initial Operations with Langley's Rendezvous Docking Facility," Langley Working Paper, LWP-21, 1964; Francis B. Smith, "Simulators for Manned Space Research," Paper presented at the 1966 IEEE International convention, March 21-25, 1966.

  11. Walheim Troubleshoots GPC 3

    NASA Image and Video Library

    2011-07-11

    S135-E-007351 (11 July 2011) --- NASA astronaut Rex Walheim, STS-135 mission specialist, watches as astronaut Chris Ferguson (out of frame at right) toggles switches on the overhead panel of the forward flight deck of the space shuttle Atlantis. The action came during the mission's fourth day of activities in Earth orbit and second day while being docked with the International Space Station. Photo credit: NASA

  12. Implementation of Statistical Process Control: Evaluating the Mechanical Performance of a Candidate Silicone Elastomer Docking Seal

    NASA Technical Reports Server (NTRS)

    Oravec, Heather Ann; Daniels, Christopher C.

    2014-01-01

    The National Aeronautics and Space Administration has been developing a novel docking system to meet the requirements of future exploration missions to low-Earth orbit and beyond. A dynamic gas pressure seal is located at the main interface between the active and passive mating components of the new docking system. This seal is designed to operate in the harsh space environment, but is also to perform within strict loading requirements while maintaining an acceptable level of leak rate. In this study, a candidate silicone elastomer seal was designed, and multiple subscale test articles were manufactured for evaluation purposes. The force required to fully compress each test article at room temperature was quantified and found to be below the maximum allowable load for the docking system. However, a significant amount of scatter was observed in the test results. Due to the stochastic nature of the mechanical performance of this candidate docking seal, a statistical process control technique was implemented to isolate unusual compression behavior from typical mechanical performance. The results of this statistical analysis indicated a lack of process control, suggesting a variation in the manufacturing phase of the process. Further investigation revealed that changes in the manufacturing molding process had occurred which may have influenced the mechanical performance of the seal. This knowledge improves the chance of this and future space seals to satisfy or exceed design specifications.

  13. Pump Operation Workshop. Third Edition (Revised).

    ERIC Educational Resources Information Center

    Ontario Ministry of the Environment, Toronto.

    Presented is the learner's manual for a five-day workshop designed to supplement the skills of water and wastewater treatment personnel. The program consists of lecture-discussions and hands-on sessions covering the operation of water and wastewater pumps. Areas addressed include: material pumped, pump systems, types of pumps, pump controls,…

  14. 78 FR 76195 - Drawbridge Operation Regulations; Passaic River, Newark and Harrison, NJ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-17

    ... requests for bridge openings at the Dock Bridge for the past three years. Vessels that can pass under the... INFORMATION CONTACT: If you have questions on this temporary deviation, call or email Mr. Joe Arca, Project... questions on viewing the docket, call Barbara Hairston, Program Manager, Docket Operations, telephone 202...

  15. Low-Impact Mating System for Docking Spacecraft

    NASA Technical Reports Server (NTRS)

    Lewis, James L.; Robertson, Brandan; Carroll, Monty B.; Le, Thang; Morales, Ray

    2008-01-01

    A document describes a low-impact mating system suitable for both docking (mating of two free-flying spacecraft) and berthing (in which a robot arm in one spacecraft positions an object for mating with either spacecraft). The low-impact mating system is fully androgynous: it mates with a copy of itself, i.e., all spacecraft and other objects to be mated are to be equipped with identical copies of the system. This aspect of the design helps to minimize the number of unique parts and to standardize and facilitate mating operations. The system includes a closed-loop feedback control subsystem that actively accommodates misalignments between mating spacecraft, thereby attenuating spacecraft dynamics and mitigating the need for precise advance positioning of the spacecraft. The operational characteristics of the mating system can be easily configured in software, during operation, to enable mating of spacecraft having various masses, center-of-gravity offsets, and closing velocities. The system design provides multi-fault tolerance for critical operations: for example, to ensure unmating at a critical time, a redundant unlatching mechanism and two independent pyrotechnic release subsystems are included.

  16. Treponema pallidum Putative Novel Drug Target Identification and Validation: Rethinking Syphilis Therapeutics with Plant-Derived Terpenoids

    PubMed Central

    Tiwari, Sameeksha; Singh, Priyanka; Singh, Swati; Awasthi, Manika; Pandey, Veda P.

    2015-01-01

    Abstract Syphilis, a slow progressive and the third most common sexually transmitted disease found worldwide, is caused by a spirochete gram negative bacteria Treponema pallidum. Emergence of antibiotic resistant T. pallidum has led to a search for novel drugs and their targets. Subtractive genomics analyses of pathogen T. pallidum and host Homo sapiens resulted in identification of 126 proteins essential for survival and viability of the pathogen. Metabolic pathway analyses of these essential proteins led to discovery of nineteen proteins distributed among six metabolic pathways unique to T. pallidum. One hundred plant-derived terpenoids, as potential therapeutic molecules against T. pallidum, were screened for their drug likeness and ADMET (absorption, distribution, metabolism, and toxicity) properties. Subsequently the resulting nine terpenoids were docked with five unique T. pallidum targets through molecular modeling approaches. Out of five targets analyzed, D-alanine:D-alanine ligase was found to be the most promising target, while terpenoid salvicine was the most potent inhibitor. A comparison of the inhibitory potential of the best docked readily available natural compound, namely pomiferin (flavonoid) with that of the best docked terpenoid salvicine, revealed that salvicine was a more potent inhibitor than that of pomiferin. To the best of our knowledge, this is the first report of a terpenoid as a potential therapeutic molecule against T. pallidum with D-alanine:D-alanine ligase as a novel target. Further studies are warranted to evaluate and explore the potential clinical ramifications of these findings in relation to syphilis that has public health importance worldwide. PMID:25683888

  17. Poindexter and Love floating into Node 2

    NASA Image and Video Library

    2008-02-10

    S122-E-007074 (9 Feb. 2008) --- Astronauts Alan Poindexter (left), pilot for the Space Shuttle Atlantis' STS-122 crew, and Stanley Love, mission specialist, appear to enjoy the view aboard the International Space Station shortly after ingress on docking day.

  18. 400mm Mapping Sequence performed during the STS-119 R-Bar Pitch Maneuver

    NASA Image and Video Library

    2008-03-17

    ISS018-E-040791 (17 March 2009) --- Backdropped by a blanket of clouds, Space Shuttle Discovery is featured in this image photographed by an Expedition 18 crewmember on the International Space Station during rendezvous and docking operations. Before docking with the station, astronaut Lee Archambault, STS-119 commander, flew the shuttle through a Rendezvous Pitch Maneuver or basically a backflip to allow the space station crew a good view of Discovery's heat shield. Using digital still cameras equipped with both 400 and 800 millimeter lenses, the ISS crewmembers took a number of photos of the shuttle's thermal protection system and sent them down to teams on the ground for analysis. A 400 millimeter lens was used for this image. Docking occurred at 4:20 p.m. (CDT) on March 17, 2009. The final pair of power-generating solar array wings and the S6 truss segment are visible in Discovery?s cargo bay.

  19. 400mm Mapping Sequence performed during the STS-119 R-Bar Pitch Maneuver

    NASA Image and Video Library

    2008-03-17

    ISS018-E-040792 (17 March 2009) --- Backdropped by a blanket of clouds, Space Shuttle Discovery is featured in this image photographed by an Expedition 18 crewmember on the International Space Station during rendezvous and docking operations. Before docking with the station, astronaut Lee Archambault, STS-119 commander, flew the shuttle through a Rendezvous Pitch Maneuver or basically a backflip to allow the space station crew a good view of Discovery's heat shield. Using digital still cameras equipped with both 400 and 800 millimeter lenses, the ISS crewmembers took a number of photos of the shuttle's thermal protection system and sent them down to teams on the ground for analysis. A 400 millimeter lens was used for this image. Docking occurred at 4:20 p.m. (CDT) on March 17, 2009. The final pair of power-generating solar array wings and the S6 truss segment are visible in Discovery?s cargo bay.

  20. 400mm Mapping Sequence performed during the STS-119 R-Bar Pitch Maneuver

    NASA Image and Video Library

    2008-03-17

    ISS018-E-040790 (17 March 2009) --- Backdropped by the blackness of space, Space Shuttle Discovery is featured in this image photographed by an Expedition 18 crewmember on the International Space Station during rendezvous and docking operations. Before docking with the station, astronaut Lee Archambault, STS-119 commander, flew the shuttle through a Rendezvous Pitch Maneuver or basically a backflip to allow the space station crew a good view of Discovery's heat shield. Using digital still cameras equipped with both 400 and 800 millimeter lenses, the ISS crewmembers took a number of photos of the shuttle's thermal protection system and sent them down to teams on the ground for analysis. A 400 millimeter lens was used for this image. Docking occurred at 4:20 p.m. (CDT) on March 17, 2009. The final pair of power-generating solar array wings and the S6 truss segment are visible in Discovery?s cargo bay.

Top