San Diego transit five year plan update : FY 1982-1986
DOT National Transportation Integrated Search
1981-07-01
The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...
Louisiana Airport System Plan Five-Year Capital Improvement Program.
DOT National Transportation Integrated Search
1992-07-01
The Louisiana Airport System Plan (LASP) Five-Year-Capital Improvement Program (CIP) is a development plan for all commercial service, reliever, and general aviation airports in Louisiana. It is a detailed listing of potential projects based on the a...
Manned Orbital Transfer Vehicle (MOTV). Volume 6: Five year program plan
NASA Technical Reports Server (NTRS)
Boyland, R. E.; Sherman, S. W.; Morfin, H. W.
1979-01-01
The five year program plan for the manned orbit transfer vehicle (MOTV) is presented. The planning, schedules, cost estimates, and supporting data (objectives, constraints, assumptions, etc.) associated with the development of the MOTV are discussed. The plan, in addition to the above material, identifies the supporting research and technology required to resolve issues critical to MOTV development.
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
DOT National Transportation Integrated Search
1996-08-01
This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...
Defense Communications Agency Cost and Planning Factors Manual. Change 2.
1985-09-23
5 39-6 40. FISCAL -YEAR TIME PHASING OF COST ESTIMATE ...... 40-1 (To be published later) 41. DISCOUNTING General...cubic foot (feet) ft3 /min cubic foot (feet) per minute FY fiscal year FYDP Five Year Defense Program FYP Five Year Program G&A general & administrative... fiscal year 1 of the subsystem project plan. The remainder of the equipment and buildings and the training are to be contracted for and the system turned
ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM: AGROECOSYSTEM 1992 PILOT PLAN
The Agroecosystem Resource Group (ARG) of the Environmental Protection Monitoring and Assessment Program (EMAP) has developed a five year program strategy for implementation of a suite of indicators for monitoring agroecosystem status and trends. he five-year period (1991-1995) i...
[The Endemic Situation and Challenges of Major Parasitic Diseases in China].
Yan, Jun; Hu, Tao; Lei, Zheng-long
2015-12-01
During the twelfth "Five-year Plan" period, the Chinese government further strengthened the implementation of several medium and long-term plans on disease control, which resulted in the acceleration of the control of schistosomiasis, malaria and echinococcosis. To further elucidate the endemic status and control experience during the stage, this article described current situation on the major parasitic diseases and put forward the challenges and consequent countermeasures for planning the control programs in the next five years and laying a foundation for the next Five-year Planning.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less
Lessons Learned. Multiple Launch Rocket System
1980-07-01
should be cognizant of the five- year planning cycle for NATO programs and/or the military construction funding cycle ix o There is a definite need to...FY 86, a rocket buy will be awarded following a multiple- year buy-out competition. To satisfy US needs, this award is efexpected to bc in excess of...support facilities, should be cognizant of the five- year planning cycle for NATO programs and/or the military construction funding, as well as the long
A Review of the Status and Projections for the Dade County Quinmester Extended School Year Program.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
This document summarizes the background of the Dade County Quinmester Extended School Year Program involving five high schools in a pilot project. The program resulted from a study of alternative plant utilization plans for the most efficient use of school facilities to reduce the need for capital expenditure during the next five years. Discussed…
Child Health and Human Development: An Overview and Strategy for a Five-Year Research Plan.
ERIC Educational Resources Information Center
National Inst. of Child Health and Human Development (NIH), Bethesda, MD.
The first five-year research plans developed by the National Institute of Child Health and Human Development (NICHD), covering fiscal years 1983-1987 and 10 program areas, are published in this volume. Present knowledge is reviewed and research opportunities are indicated in the areas of reproduction, fetal development, the birth process, the…
40 CFR 68.168 - Five-year accident history.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Five-year accident history. 68.168 Section 68.168 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.168 Five-year accident history...
40 CFR 68.168 - Five-year accident history.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Five-year accident history. 68.168 Section 68.168 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.168 Five-year accident history...
40 CFR 68.168 - Five-year accident history.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Five-year accident history. 68.168 Section 68.168 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.168 Five-year accident history...
40 CFR 68.168 - Five-year accident history.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Five-year accident history. 68.168 Section 68.168 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.168 Five-year accident history...
40 CFR 68.168 - Five-year accident history.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Five-year accident history. 68.168 Section 68.168 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.168 Five-year accident history...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
Projecting Program Cost Over an Adequate Time Horizon.
ERIC Educational Resources Information Center
Spencer, Milton
Planning Programming Budgeting Systems involve the introduction of three major operational concepts. First, the development of an analytical capability to examine in depth both agency objectives and the various programs to meet these objectives. Second, the formation of a five-year planning and programming process combined with a sophisticated…
Environmental Assessment 819th Red Horse Five Year Plan, Malmstrom Air Force Base, Montana
2007-08-07
1 FINDING OF NO SIGNIFICANT IMPACT 2 ENVIRONMENTAL ASSESSMENT 3 819TU RED HORSE FIVE YEAR PLAN 4 MALMSTROM AIR FORCE BASE, MONTANA 5 AGENCY...7 BACKGROUND: The 819th RHS was activated on 8 August 1997 at Malmstrom AFB. The 8 RED HORSE mission requires rapid deployment of personnel and... HORSE SQ 5-year Plan 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) Jonathan Anstey; Heidi Brothers; Tamara Carroll; Pete Feigley; Sarah
SNL Five-Year Facilities & Infrastructure Plan FY2015-2019
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cipriani, Ralph J.
2014-12-01
Sandia’s development vision is to provide an agile, flexible, safer, more secure, and efficient enterprise that leverages the scientific and technical capabilities of the workforce and supports national security requirements in multiple areas. Sandia’s Five-Year Facilities & Infrastructure Planning program represents a tool to budget and prioritize immediate and short-term actions from indirect funding sources in light of the bigger picture of proposed investments from direct-funded, Work for Others and other funding sources. As a complementary F&I investment program, Sandia’s indirect investment program supports incremental achievement of the development vision within a constrained resource environment.
Educational affairs plan: A five-year strategy
NASA Technical Reports Server (NTRS)
1987-01-01
A five-year plan is presented to guide the use of NASA resources in administering a focused and consistent set of aeronautics and space science education programs. Major initiatives outlined in this plan fall into two categories: programmatic priorities and institutional priorities. Programmatic priorities for this plan include elementary education, teacher education, underrepresented minority participation, educational technology and the Aerospace Education Services Project (AESP). Institutional priorities highlighted in this plan include university programs, educational publications and their distribution, educational partnerships with public and private organizations, educational research and evaluation, and activities of the educational affairs administration. The plan's aim is to directly and indirectly help to ensure an adequate pool of talented scientists, engineers and technical personnel to keep NASA at the forefront of advancements for the 21st century.
MnDOT research program strategic plan 2017-2022.
DOT National Transportation Integrated Search
2017-03-01
In response to the top transportation trends in Minnesota, and opportunities and challenges facing its transportation system, MnDOT has developed this five-year Research Program Strategic Plan (2017 2022) to take stock of its research portfolio, ...
Bioenergy Technologies Office Multi-Year Program Plan: July 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-07-09
This is the May 2014 Update to the Bioenergy Technologies Office Multi-Year Program Plan, which sets forth the goals and structure of the Office. It identifies the research, development, demonstration, and deployment activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation.
Program planning for the community teaching hospital medical library.
McCorkel, J; Cook, V
1985-01-01
To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443
Comprehensive Education Plan, School Year 1986-87.
ERIC Educational Resources Information Center
District of Columbia Public Schools, Washington, DC. Research Information Center.
The Board of Education and the administration of the District of Columbia Public Schools cooperated to compose a five-year plan for the 1983-87 school years. Long range and intermediate objectives of the plan are described and the offices accountable for them are indicated. The program for the 1986-87 school year is extracted from those…
San Francisco Municipal Railway 5-Year Plan: 1979-1984
DOT National Transportation Integrated Search
1979-02-22
Presents MUNI's five year "master" plan for the programming of transit operations. It describes the existing system and what is anticipated for the future. It covers route design, operations, rolling stock requirements, and evaluates each on the basi...
Space Station Freedom operations planning
NASA Technical Reports Server (NTRS)
Accola, Anne L.; Keith, Bryant
1989-01-01
The Space Station Freedom program is developing an operations planning structure which assigns responsibility for planning activities to three tiers of management. The strategic level develops the policy, goals and requirements for the program over a five-year horizon. Planning at the tactical level emphasizes program integration and planning for a two-year horizon. The tactical planning process, architecture, and products have been documented and discussed with the international partners. Tactical planning includes the assignment of user and system hardware as well as significant operational events to a time increment (the period of time from the arrival of one Shuttle to the manned base to the arrival of the next). Execution-level planning emphasizes implementation, and each organization produces detailed plans, by increment, that are specific to its function.
ERIC Educational Resources Information Center
ENDWRIGHT, D.K.
THE PLAN FOR EXPANSION AND DEVELOPMENT OF EDUCATION PROGRAMS IN CORRECTIVE INSTITUTIONS IS ORGANIZED INTO FIVE TIMED PHASES TO BE COMPLETED IN THREE YEARS. A CHART REPRESENTING THE PROGRAM, AFFILIATED RESEARCH AND AGENCIES DELINEATES PLANNED ACTIVITIES. PHASE ONE (15 WEEKS) WILL SURVEY EXISTING PROGRAMS (VOCATIONAL AND ACADEMIC FACILITIES,…
Translations on Environmental Quality No. 133
1977-03-16
the program for Pernik was completed. The plan for forestation and soil protection has been satisfactorily fulfilled during the Sixth Five-Year Plan...other measures directed at soil protection . More than ii2,000 decares of damaged land will be recultivated (as against 11,000 decares in the Sixth Five
Trends in state outdoor recreation from periodic to process planning: the Minnesota example
William H. Becker; George Orning
1980-01-01
After a decade of trial, a change in federal planning philosophy is forcing many state recreation planning programs to change. Ten years of experience showed that plans produced periodically - every five years - grew stale and failed to provide the flexibility necessary to meet changing recreation markets and environmental problems. Recognizing these problems, the...
2013-2017 highway program summary.
DOT National Transportation Integrated Search
2012-06-01
The Iowa Transportation Commission (Commission) and the Iowa Department of : Transportation (DOT) develop Iowas Five Year Highway Program (Program) to : inform you of planned investments in our states primary and interstate highway : system. Th...
The Power to Grow: Success Stories from the National Library Power Program.
ERIC Educational Resources Information Center
Sadowski, Michael
1994-01-01
Describes the National Library Program supported by the DeWitt Wallace-Reader's Digest Fund. The program's national goals and guidelines and results of eight projects are presented. Brief descriptions of five new projects and nine planning sites are given. Continuation plans and the possibility of funding beyond the three-year project period are…
Using the Logic Model to Plan Extension and Outreach Program Development and Scholarship
ERIC Educational Resources Information Center
Corbin, Marilyn; Kiernan, Nancy Ellen; Koble, Margaret A.; Watson, Jack; Jackson, Daney
2004-01-01
In searching for a process to help program teams of campus-based faculty and field-based educators develop five-year and annual statewide program plans, cooperative extension administrators and specialists in Penn State's College of Agricultural Sciences discovered that the use of the logic model process can influence the successful design of…
39 CFR 3.7 - Information furnished to Board-program review.
Code of Federal Regulations, 2010 CFR
2010-07-01
... visibility or the operating budget (including increases in expense amounts) or the capital investment budget...; (2) Five-year plans, annual operating and investment plans, and significant departures from estimates...
Seattle University: On the Threshold of the Eighties. A Five-Year Planning Report.
ERIC Educational Resources Information Center
Seattle Univ., WA.
A portrait of Seattle University is drawn in this first of a series of annual reports to the president and trustees on the progress of the formal, comprehensive, and systematic, systematic planning process at Seattle University, a process begun in 1975. Focus is on five areas: enrollment, academic programs, personnel, finance, and facilities and…
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
This program planning guide for a two-year postsecondary radiation protection technician program is designed for use with courses 17-22 of thirty-five included in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians, and operators; and to assist planners,…
Code of Federal Regulations, 2010 CFR
2010-04-01
...) [Reserved] (6) Senior Community Service Employment Programs under title V of the Older Americans Act. (b... meeting the requirements of the Interagency guidance entitled State Unified Plan, Planning Guidance for...
Statewide Transportation Improvement Program 1997-2001
DOT National Transportation Integrated Search
1996-07-01
The Utah Department of Transportation's Statewide Transportation Improvement Plan (STIP) is a five-year program of highway and transit projects for the State of Utah. It is a compilation of projects utilizing various federal and state funding program...
The NASA Geodynamics Program: An overview
NASA Technical Reports Server (NTRS)
1983-01-01
This NASA Geodynamics Program overview collectively examines the history, scientific basis, status, and results of the NASA Program and outlines plans for the next five to eight years. It is intended as an informative nontechnical discussion of geodynamics research.
Undergraduate design projects to aid persons with disabilities: reflections.
Barret, Steven F; Morton, Scott A; Root-Elledge, Sandy
2007-01-01
In Spring 2002 the University of Wyoming, College of Engineering, received a five year grant from the National Science Foundation to link senior capstone design projects with the custom requirements of the assistive technology (AT) community. This serendipitous collaboration has been highly beneficial to our senior design students as well as individuals with a disability requiring one-of-a-kind AT devices. Now that the program is coming to a close on its five year term, we believe there are lessons we have learned that would be valuable to others considering participation in such a program. We will briefly review program development and organization, highlight lessons learned, and discuss program benefits and pitfalls. Paper emphasis will be on the practical implementation and management of this valuable program. Due to the rich benefits received from participating in the program, we plan on applying for a second five year program funding increment.
ERIC Educational Resources Information Center
Center for Occupational Research and Development, Inc., Waco, TX.
This program planning guide for a two-year postsecondary nuclear reactor (plant) operator trainee program is designed for use with courses 1-16 of thirty-five in the Nuclear Technology Series. The purpose of the guide is to describe the nuclear power field and its job categories for specialists, technicians and operators; and to assist planners,…
Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-11-01
This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.
NASA Technical Reports Server (NTRS)
Smith, Jacqueline G.; Gardner, James E.
1990-01-01
The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, J. E.; Dixon, S. C.
1986-01-01
The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
NASA Technical Reports Server (NTRS)
Gardner, James E.; Dixon, S. C.
1987-01-01
The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
Educational Plant Survey: Seminole Community College, June 20-23, 1989.
ERIC Educational Resources Information Center
Florida State Dept. of Education, Tallahassee. Office of Educational Facilities.
At least every five years, each Florida community college district conducts an educational plant survey to aid the formulation of plans for housing the educational program, student population, faculty, administrators, staff, and auxiliary and ancillary services for the college for the forthcoming five-year period. This plant survey report for…
2012-2016 Highway Program summary : approved June 2011.
DOT National Transportation Integrated Search
2011-06-01
The Iowa Transportation Commission (Commission) and the Iowa Department of : Transportation (Iowa DOT) develop Iowas Five Year Highway Program to inform : Iowans of planned investments in our states primary highway system. This : brochure summa...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Site Management System (SMS) guidance requires a Fiscal Year Work Plan (FYWP) to be prepared for the Environmental Restoration (ER) Mission Area and all related programs. This revision is a complete update to cover the FY 1994 time period. This document describes the overall ER Missions Area and provides FYWP appendices for each of the following five program areas: Remedial Action (RA); Decontamination and Decommissioning (D&D); Project Management and Support (PM&S); Surveillance and Maintenance (S&M); and Disposal Facilities (DF).
Deferred Maintenance Program Handbook.
ERIC Educational Resources Information Center
California State Dept. of General Services, Sacramento. Office of Public School Construction.
This handbook provides process information on California's Deferred Maintenance Program, including a description of the administering body of law. Chapters discuss the program's process on the topics of basic/additional apportionment, fund release (basic/additional and critical hardship), the Deferred Maintenance Five-Year Plan, district deposit,…
Missions to the sun and to the earth. [planning of NASA Solar Terrestrial Program
NASA Technical Reports Server (NTRS)
Timothy, A. F.
1978-01-01
The program outlined in the present paper represents an optimized plan of solar terrestrial physics. It is constrained only in the sense that it involves not more than one new major mission per year for the Solar Terrestrial Division during the 1980-1985 period. However, the flight activity proposed, if accepted by the Agency and by Congress, would involve a growth in the existing Solar Terrestrial budget by more than a factor of 2. Thus, the program may be considered as somewhat optimistic when viewed in the broader context of the NASA goals and budget. The Agency's integrated FY 1980 Five Year Plan will show how many missions proposed will survive this planning process.
ITS National Intelligent Transportation Systems Program Plan: Five Year Horizon Plan
DOT National Transportation Integrated Search
2000-08-01
Transportation is vital to the social and economic health of the nation. Surface transportation systems - the net-works of highways, local streets, bus routes, and rail lines - are the ties that bind communities and facilitate commerce, connecting re...
ENVIRONMENTAL MONITORING AND ASSESSMENT PROGRAM - AGROECOSYSTEM PILOT FIELD PROGRAM PLAN - 1993
The Agroecosystem Resource Group (ARG) of the Environmental Monitoring and Assessment Program (EMAP) has developed a five-year (1991-1995) strategy for the development, evaluation, and implementation of a suite of indicators for monitoring agroecosystem status and trends on a reg...
NASA Technical Reports Server (NTRS)
Dixon, S. C.; Gardner, James E.
1988-01-01
The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.
An Economic History of Medicare Part C
Mcguire, Thomas G; Newhouse, Joseph P; Sinaiko, Anna D
2011-01-01
Context: Twenty-five years ago, private insurance plans were introduced into the Medicare program with the stated dual aims of (1) giving beneficiaries a choice of health insurance plans beyond the fee-for-service Medicare program and (2) transferring to the Medicare program the efficiencies and cost savings achieved by managed care in the private sector. Methods: In this article we review the economic history of Medicare Part C, known today as Medicare Advantage, focusing on the impact of major changes in the program's structure and of plan payment methods on trends in the availability of private plans, plan enrollment, and Medicare spending. Additionally, we compare the experience of Medicare Advantage and of employer-sponsored health insurance with managed care over the same time period. Findings: Beneficiaries' access to private plans has been inconsistent over the program's history, with higher plan payments resulting in greater choice and enrollment and vice versa. But Medicare Advantage generally has cost more than the traditional Medicare program, an overpayment that has increased in recent years. Conclusions: Major changes in Medicare Advantage's payment rules are needed in order to simultaneously encourage the participation of private plans, the provision of high-quality care, and to save Medicare money. PMID:21676024
DOT National Transportation Integrated Search
2000-09-01
The current performance-related specifications (PRS) methodology has been under development by the Federal Highway Administration (FHWA) for several years and has now reached a level at which it can be implemented by State highway agencies. PRS for h...
North Dakota University System Five-Year Plan. Daring to Be Great: The NDUS Edge
ERIC Educational Resources Information Center
North Dakota University System, 2017
2017-01-01
This report presents the 2017-19 edition of the State Board of Higher Education's strategic narrative. Contents include: (1) North Dakota University System (NDUS) colleges and locations; (2) Board Chair Neset's report; (3) Five-year goals; (4) Deliver degrees that are the best value in the nation; (5) Provide programs people want; (6) Equip…
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY.
NOTING THAT THE WELFARE OF INDIVIDUAL CITIZENS AS WELL AS THE WELFARE OF THE CITY, STATE, AND NATION DEMANDS THAT THE VICIOUS CYCLE OF INSUFFICIENT EDUCATIONAL OPPORTUNITIES, UNEMPLOYMENT, AND POVERTY BE BROKEN, THE BOARD OF EDUCATION OF NEW YORK CITY PROPOSED A 5-YEAR EMERGENCY PROGRAM FOR QUALITY EDUCATION. THE PROGRAM INCLUDES PLANS FOR THE…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-10-01
This document supersedes the previous one, taking into account changes that have taken place in the CFS Science and Technology (S and T) program structure and organization, and in the structure of the Program of Energy Research and Development, the source of funding for CFS bioenergy research. It explains the rationale and overall objective for the bioenergy research program and briefly reviews the accomplishments to date. It indicates the planning context within which the program operates, states the specific objectives for the period of the plan, and details the strategic priorities developed for this period. Finally, it outlines the implementationmore » process for the plan.« less
Gates Fund Creates Plan for College Completion
ERIC Educational Resources Information Center
Gose, Ben
2008-01-01
The Bill & Melinda Gates Foundation plans to spend several hundred million dollars over the next five years to double the number of low-income young people who complete a college degree or certificate program by age 26. Foundation officials described the ambitious plan to an exclusive group of education leaders, citing 2025 as a target goal. If…
Role of Colleges in Adult Education--Adjustments
ERIC Educational Resources Information Center
Mathias, Irene
1978-01-01
If colleges are to be relevant to the needs of India, they must plan and implement programs of direct benefit to the community and thus contribute to the nation's resolve to extend adult education programs within the next five years to combat illiteracy. (LBH)
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
Language Planning and Language Policy in Australia.
ERIC Educational Resources Information Center
Liddicoat, Anthony, Ed.
1991-01-01
A five-year period of particular activity in Australian language policy and language planning culminated with the 1991 publication of the White Paper called Australia's Language, which outlines proposed government programs in languages until 1994. Many of the papers in this theme issue of the journal of the Applied Linguistics Association of…
U.S. Department of Education Federal Student Aid Five-Year Plan, 2006-2010
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
This document reflects Federal Student Aid's solid progress in meeting strategic objectives since becoming a Performance-Based Organization. Specifically, the plan addresses continuing efforts to increase program integrity, improve customer service and achieve measurable results in the management and administration of the Title IV student…
ERIC Educational Resources Information Center
Chachere, Ernest G.; Nowatny, Franz A.
1982-01-01
Louisiana's Educational Employees' Professional Improvement Program (PIP) is described. The voluntary statewide program features: (1) use of individual professional development plans submitted by school staff participants; (2) a combination of academic work, inservice training, workshops, and conferences over a five-year period; and (3) salary…
Physical Education Objectives. DOD Dependents Schools.
ERIC Educational Resources Information Center
Dependents Schools (DOD), Washington, DC.
These program objectives were developed to support the Department of Defense Dependent Schools Five Year Curriculum Development Plan and are designed to provide a basis for elementary, middle, and secondary school physical education curricula. A balance of psychomotor, cognitive, and affective aspects is emphasized. General, program, and…
Employer evaluations of nurse graduates: a critical program assessment element.
Ryan, M E; Hodson, K E
1992-05-01
Accountability in higher education dictates implementation of a comprehensive evaluation plan. Employer evaluation of graduates is an important component of program evaluation and contributes a different view that is rarely reported in the literature. The purpose of this study was to establish a database by surveying employers of baccalaureate-prepared nurses, postgraduation, over a five-year period. Employer surveys measured perceptions of graduates' functioning. Findings indicated that graduates function above expected levels for leadership skills, nursing skills, communication skills, and professionalism. Systematic program evaluation by employers is recommended at one and five years after graduation. A tool for employer evaluation of baccalaureate graduates is discussed.
ERIC Educational Resources Information Center
Clark, Sarah C.; Murray, Margo
2005-01-01
Clark and Murray examine the six Critical Performance Factors for Mega planning in an example drawn from the five-year history of the population program of a major west coast philanthropy. In this article, the authors describe the salience and scope of the population issue as it is relates to other global trends; the steps the foundation took to…
Solar Terrestrial programs: A five year plan
NASA Technical Reports Server (NTRS)
Stern, D. P.
1978-01-01
Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.
Participation in Schools? Five Case Studies. ACER Research Series No. 98.
ERIC Educational Resources Information Center
Fitzgerald, R. T.; And Others
The issues of public participation in schools and school-community relations are surveyed, the findings of a two-year research program conducted in five secondary schools examined, and some suggestions made for policy in the areas of local participation in schools and the planning of change in schools. The schools are described as (1) a large…
Pellissippi State Technical Community College Five-Year Strategic Planning Directions, 1998-2003.
ERIC Educational Resources Information Center
Pellissippi State Technical Community Coll., Knoxville, TN.
The document contains the strategic plan for Pellissippi State Technical Community College (Tennessee). The previous five-year strategic plan, "The Pathfinder Project," was prepared in 1994 but was out of date before the end of the five-year planning cycle. To secure information for projecting new five-year strategic directions and goals…
Resource Based Learning: An Experience in Planning and Production.
ERIC Educational Resources Information Center
McAleese, Ray; Scobbie, John
A 2-year project at the University of Aberdeen focused on the production of learning materials and the planning of audiovisual based instruction. Background information on the project examines its origins, the nature of course teams, and the evaluation of the five text-tape programs produced. The report specifies three project aims: (1) to produce…
1996-01-01
architecture for a family of sys- tems. The Feature-Oriented Domain Analysis ( FODA ) method looks primarily at "user-visible" aspects of a domain. The...Partners I-9 1.4.2 Acquisition, Development, and Post Deployment 1-10 2 Strategic Overview 1-15 2.1 Situation Analysis 1-15 2.1.1...Contents Strategic Overview 1-15 2.1 Situation Analysis 1-15 2.1.1 DoD Budget Reductions, Downsizing, and the Changing Role of the Military
Colorado Children's Budget 2012
ERIC Educational Resources Information Center
Buck, Beverly; Cuciti, Peggy L.; Baker, Robin
2012-01-01
The "Colorado Children's Budget 2012" examines the state's commitment to investing in the well-being of children. It tallies up Colorado's actual and planned investment during the past five years (Fiscal Year (FY) 2008-2009 through FY 2012-2013) on programs and services in four areas: Early Childhood Learning and Development, K-12…
Development Report for the Telecommunications Technology 2+2 Program. Grant Year 2--1990/1991.
ERIC Educational Resources Information Center
Kooker, Steve; Brey, Ron
This report describes the second-year activities of Austin (Texas) Community College's development of a curriculum for a degree in Telecommunications Technology (Electronics) involving an articulation agreement with Leander Independent School District. Specifically, the report describes: the planning of five credit courses for telecommunications…
Talents Unlimited Program: Summary of Research Finding for 1979-80.
ERIC Educational Resources Information Center
McLean, James E.; Chissom, Brad S.
During the 1979-80 school year, the Talents Unlimited (TU) program (validated by the Joint Dissemination Review Panel) for talented students in grades 1 through 6 was evaluated by nine adopting school systems. Five talent areas were addressed: communication, forecasting, decision making, productive thinking, and planning. Data were analyzed for…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poncio, S.; Adkison, P.
Coating costs are escalating due to increased awareness of the environment and safety and health issues. Owners can reduce the overall cost of maintenance painting projects through the implementation of a total quality program. This program should encompass project pre-planning, evaluation of safety and quality assurance programs, and analysis of employee absenteeism and turnover. The information presented is a case history of one utility's experience managing a maintenance painting program during a five-year period.
ERIC Educational Resources Information Center
Texas Higher Education Coordinating Board, Austin.
This databook contains information on student enrollments, faculty, semester credit hours, physical facilities, appropriations, and student loan and grant programs for Texas institutions of higher education, including public and independent two- and four-year colleges. The enrollment section provides five-year (1983-87) summaries of headcount…
Environmental hazards assessment program. Annual report, July 1, 1994--June 30, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-31
This report describes activities and reports on progress for the third year of the DOE grant to support the Environmental Hazards Assessment Program (EHAP). It reports progress against grant objectives and the Program Implementation Plan published at the end of the first year of the grant. As the program has evolved, more projects have been funded and many existing projects have become more complex. Thus, to accomplish better the objectives over the years and retain a solid focus on the total mission, we have reorganized the grant effort from three to five majoe elements: Public and professional outreach; Clinical programs;more » Science programs; Information systems; and, Program management.« less
Revised Fifth Five Year Economic and Social Development Plan, 1984-1986.
1987-01-01
This document contains provisions of chapter 6 (Promoting Social Development) of the Revised Fifth Five-Year Economic and Social Development Plan (1984-86) of the Republic of Korea. The plan calls for the efficient control of population growth by targeting intensive efforts to women 20-30 years old, eradicating the traditional preference for male children, providing incentives to foster a small family norm, and discouraging couples from having too many children. Family planning (FP) programs will be expanded to increase the contraceptive prevalence rate and improve the quality of contraceptive services. Emphasis will be placed on women 34 years or younger residing in poor urban and remote rural areas. The emphasis of the evaluations of FP guidance and evaluation teams will be on the actual prevention of birth rather than on the contraceptive use ratio, and the FP program will be linked to other health and medical schemes. Families with 2 children or less will receive extended medical services and free kindergarten tuition. Families with 3 or more children may face discriminatory policy measures. The Family Law will be amended to allow daughters to inherit, the Medical Insurance Law will be changed to allow family members dependent upon female workers to be insured, and social institutions hindering female participation in the work force will be banned. The dissemination of FP information and population education will be expanded.
Code of Federal Regulations, 2010 CFR
2010-07-01
... facilities on a per-pupil basis. (b) Quality of plan. (1) The likelihood that the proposed grant project will... a program without the total amount of assistance (State and Federal) declining over a five-year... authorized purposes. (3) The quality of the plan for identifying charter schools and determining their...
24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HUD review and approval of... Grant Program (for PHAs That Own or Operate 250 or More Public Housing Units) § 968.320 HUD review and... inadequate PHA performance, audit findings, or civil rights compliance findings; (2) Acceptance for review...
Code of Federal Regulations, 2011 CFR
2011-07-01
... facilities on a per-pupil basis. (b) Quality of plan. (1) The likelihood that the proposed grant project will... a program without the total amount of assistance (State and Federal) declining over a five-year... authorized purposes. (3) The quality of the plan for identifying charter schools and determining their...
National Intelligent Transportation Systems Program Plan: Five-Year Horizon
DOT National Transportation Integrated Search
2013-06-01
This white paper is a follow-up to the Volpe Center report for FHWA, Ridesharing Options Analysis and Practitioners Toolkit. The white paper provides an update to current ridesharing options and further explores technology and policy develop...
National Intelligent Transportation Systems program plan : five-year horizon
DOT National Transportation Integrated Search
2003-06-01
This report contains selected information on toll facilities in the United States. The information is based on a survey of facilities in operation, financed, or under construction as of January 1, 2003. /Abstract from report, p. x/
DOT National Transportation Integrated Search
1997-09-30
This document has been prepared to describe how the U.S. Department of Transportations (US DOT) Five- Year Strategic Plan for Professional Capacity Building for ITS Transportation Management and Traveler Information Services is being implemented, ...
Kripke, Katharine; Opuni, Marjorie; Schnure, Melissa; Sgaier, Sema; Castor, Delivette; Reed, Jason; Njeuhmeli, Emmanuel; Stover, John
2016-01-01
Despite considerable efforts to scale up voluntary medical male circumcision (VMMC) for HIV prevention in priority countries over the last five years, implementation has faced important challenges. Seeking to enhance the effect of VMMC programs for greatest and most immediate impact, the U. S. President's Plan for AIDS Relief (PEPFAR) supported the development and application of a model to inform national planning in five countries from 2013-2014. The Decision Makers' Program Planning Toolkit (DMPPT) 2.0 is a simple compartmental model designed to analyze the effects of client age and geography on program impact and cost. The DMPPT 2.0 model was applied in Malawi, South Africa, Swaziland, Tanzania, and Uganda to assess the impact and cost of scaling up age-targeted VMMC coverage. The lowest number of VMMCs per HIV infection averted would be produced by circumcising males ages 20-34 in Malawi, South Africa, Tanzania, and Uganda and males ages 15-34 in Swaziland. The most immediate impact on HIV incidence would be generated by circumcising males ages 20-34 in Malawi, South Africa, Tanzania, and Uganda and males ages 20-29 in Swaziland. The greatest reductions in HIV incidence over a 15-year period would be achieved by strategies focused on males ages 10-19 in Uganda, 15-24 in Malawi and South Africa, 10-24 in Tanzania, and 15-29 in Swaziland. In all countries, the lowest cost per HIV infection averted would be achieved by circumcising males ages 15-34, although in Uganda this cost is the same as that attained by circumcising 15- to 49-year-olds. The efficiency, immediacy of impact, magnitude of impact, and cost-effectiveness of VMMC scale-up are not uniform; there is important variation by age group of the males circumcised and countries should plan accordingly.
Intervention mapping: a process for developing theory- and evidence-based health education programs.
Bartholomew, L K; Parcel, G S; Kok, G
1998-10-01
The practice of health education involves three major program-planning activities: needs assessment, program development, and evaluation. Over the past 20 years, significant enhancements have been made to the conceptual base and practice of health education. Models that outline explicit procedures and detailed conceptualization of community assessment and evaluation have been developed. Other advancements include the application of theory to health education and promotion program development and implementation. However, there remains a need for more explicit specification of the processes by which one uses theory and empirical findings to develop interventions. This article presents the origins, purpose, and description of Intervention Mapping, a framework for health education intervention development. Intervention Mapping is composed of five steps: (1) creating a matrix of proximal program objectives, (2) selecting theory-based intervention methods and practical strategies, (3) designing and organizing a program, (4) specifying adoption and implementation plans, and (5) generating program evaluation plans.
Adult Education, Cooperatives and Green Revolution
ERIC Educational Resources Information Center
Jain, K. C.
1970-01-01
The basic approach of the Fourth Five Year Plan in India is the creation of conditions necessary for a 5 percent growth in agriculture. The Cooperatives have made a real contribution in the improvement of agriculture and have now launched a member education program. (EB)
ERIC Educational Resources Information Center
McCallister, Kelly C.; Peuler, Mollie
2016-01-01
Creating and maintaining a successful library distance education program, even given ideal variables, can be a huge challenge. This article will discuss how the library distance program was planned, implemented, and evaluated in a three-year span. A staff of three-five librarians utilized organizational partnerships, grassroots marketing and…
NASA Technical Reports Server (NTRS)
Agnew, Donald L.; Jones, Peter A.
1989-01-01
A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Hamel, W.R.; Barhen, J.
1986-02-01
The Oak Ridge National Laboratory has established the Center for Engineering Systems Advanced Research (CESAR) for the purpose of addressing fundamental problems of intelligent machine technologies. The purpose of this document is to establish a framework and guidelines for research and development within ORNL's CESAR program in areas pertaining to intelligent machines. The specific objective is to present a CESAR Research and Development Plan for such work with a planning horizon of five to ten years, i.e., FY 1985 to FY 1990 and beyond. As much as possible, the plan is based on anticipated DOE needs in the area ofmore » productivity increase and safety to the end of this century.« less
Big Jobs: Planning for Competence
ERIC Educational Resources Information Center
Jones, Nancy P.
2005-01-01
Three- to five-year-olds grow emotionally participating in meaningful and challenging physical, social, and problem-solving activities outdoors in an early childhood program on a farm. Caring for animals, planting, raking, shoveling, and engaging in meaningful indoor activities, under adult supervision, children learn to work collaboratively,…
Research and Technology Operating Plan. Summary: Fiscal year 1976 research and technology program
NASA Technical Reports Server (NTRS)
1976-01-01
A compilation of the summary portions of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA was presented. The document is arranged in five sections. The first one contains citations and abstracts of the RTOP. This is followed by four indexes: subject, technical monitor, responsible NASA organization, and RTOP number.
Los Alamos National Laboratory SAVY-4000 Field Surveillance Plan Update for 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick
The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” The Los Alamos National Laboratory (LANL) SAVY-4000 Field Surveillance Plan was first issued in FY 2013 (Kelly et al. 2013). The surveillance plan is reviewed annually and updated as necessary based on SAVY-4000 surveillance and other surveillance findings, as well as results of the lifetime extension studies (Blair et al. 2012, Weis et al. 2015a).more » The LANL SAVY-4000 Field Surveillance Plan Update was issued in 2014 (Kelly et al. 2014). This 2016 update reflects changes to the surveillance plan resulting from restrictions on handling residue materials greater than 500 g, the addition of specific engineering judgment containers, and 2015 surveillance findings. The SAVY-4000 container has a design life of five years, which was chosen as a conservative estimate of the functional properties of the materials used in the construction of the SAVY 4000 when exposed to the potential insults including temperature, corrosive materials and gases, and radiation. The SAVY-4000 container design basis is described in a safety analysis report (Anderson et al. 2013). In the National Nuclear Security Administration's (NNSA’s) approval of the safety analysis report, it was recommended that the design life clock begin on March 2014 (Nez et al. 2014). However, it is expected that a technical basis can be developed to extend the design life of the SAVY-4000 containers to approximately 40 years (Blair et al. 2012, Weis et al. 2015a). This surveillance plan update covers five years (2015–2019) and is developed to ensure SAVY-4000 containers meet their design criteria over the current five-year design life and to gather data that can be used in developing the technical basis for a 40-year design life. The technical basis for the longer design life will be developed based on the results of this surveillance plan and the concurrent lifetime extension studies (Blair et al. 2012, Weis et al. 2015a). A long-term surveillance plan will be developed by the completion of this plan and will be based on the results of the first several years of this five-year surveillance plan and the lifetime extension studies. In addition, the current Hagan container population is so large (approximately 3,500 LANL-wide, approximately 3,000 in PF-4) that it is anticipated Hagan containers will be in use for many years to come. Therefore, this plan includes surveillance activities for the Hagan container system during the time it takes to replace the Hagan containers with manually-compliant containers such as the SAVY 4000. These Hagan examinations not only provide information to determine if additional Hagan surveillance is needed, but also support SAVY lifetime-extension studies because some of the container components are made from similar material (e.g., stainless steel and Viton).« less
ERIC Educational Resources Information Center
Information Dynamics Corp., Reading, MA.
A five-year development program plan was drawn up for the Defense Documentation Center (DDC). This report presents in summary form the results of various surveys and reviews performed in selected areas of micrographics to support the efforts of the program's planners. Exhibits of supporting documentation are presented, together with a discussion…
Helping Students and the Bottom Line: Creating a Module-Based Academic Program to Drive SEM Goals
ERIC Educational Resources Information Center
Levine, Jeffrey P.
2012-01-01
The chief academic officer to whom the author once reported gave him the freedom to be creative in implementing their institution's then-new, three-year strategic enrollment management (SEM) plan. For the fall 2010 semester, they had already exceeded projected net-tuition dollar amounts for the entire academic year. Just five months prior to…
ERIC Educational Resources Information Center
North Carolina State Dept. of Community Colleges, Raleigh.
Information sheets and student worksheets for twenty-five lesson plans designed for a third-year electrical apprentice technical training program are presented in this workbook. The information sheets provide summary information about the lesson topics and the worksheets contain problems to be solved and questions to be answered relating to each…
ERIC Educational Resources Information Center
Rice, Eric; And Others
This guidebook focuses on the first of five steps included in a planning system for improving local secondary and postsecondary program and facilities accessibility: identifying barriers. The first five sections of the booklet are comprised of self-instructional descriptions of five needs-assessment procedures that can be used to identify…
NASA Technical Reports Server (NTRS)
1991-01-01
In 1988, the Office of Space Science and Applications (OSSA) developed and published a Strategic Plan for the United States' space science and applications program during the next 5 to 10 years. The Plan presented the proposed OSSA program for the next fiscal year and defined a flexible process that provides the basis for near-term decisions on the allocation of resources and the planning of future efforts. Based on the strategies that have been developed by the advisory committees both of the National Academy of Sciences and of NASA, the Plan balances major, moderate, and small mission initiatives, the utilization of Space Station Freedom, and the requirements for a vital research base. The Plan can be adjusted to accommodate varying budget levels, both those levels that provide opportunities for an expanded science and applications program, and those that constrain growth. SSA's strategic planning is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy can yield a viable program; and check the strategy for consistency with resource constraints. The outcome of this process is a clear, coherent strategy that meets both NASA's and OSSA's goals, that assures realism in long-range planning and advanced technology development, and that provides sufficient resiliency to respond and adapt to both known and unexpected internal and external realities. The OSSA Strategic Plan is revised annually to reflect the approval of new programs, improved understanding of requirements and issues, and any major changes in the circumstances, both within NASA and external to NASA, in which OSSA initiatives are considered.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false How do the unified planning requirements apply to the five-year strategic WIA and Wagner-Peyser plan and to other Department of Labor plans? 661... ACT State Governance Provisions § 661.240 How do the unified planning requirements apply to the five...
Fellowships in Community Pharmacy Research: Experiences of Five Schools and Colleges of Pharmacy
Snyder, Margie E.; Frail, Caitlin K.; Gernant, Stephanie A.; Bacci, Jennifer L.; Coley, Kim C.; Colip, Lauren M.; Ferreri, Stefanie P.; Hagemeier, Nicholas E.; McGivney, Melissa Somma; Rodis, Jennifer L.; Smith, Megan G.; Smith, Randall B.
2017-01-01
Objective To describe common facilitators, challenges, and lessons learned of five schools and colleges of pharmacy in establishing community pharmacy research fellowships. Setting Five schools and colleges of pharmacy in the United States. Practice Description Schools and colleges of pharmacy with existing community partnerships identified a need and ability to develop opportunities for pharmacists to engage in advanced research training. Practice Innovation Community pharmacy fellowships, each structured as two years in length and in combination with graduate coursework, have been established at the University of Pittsburgh, Purdue University, East Tennessee State University, University of North Carolina at Chapel Hill and The Ohio State University. Evaluation Program directors from each of the five community pharmacy research fellowships identified common themes pertaining to program structure, outcomes, and lessons learned to assist others planning similar programs. Results Common characteristics across the programs include length of training, pre-requisites, graduate coursework, mentoring structure, and immersion into a pharmacist patient care practice. Common facilitators have been the existence of strong community pharmacy partnerships, creating a fellowship advisory team, and networking. A common challenge has been recruitment, with many programs experiencing at least one year without filling the fellowship position. All program graduates (n=4) have been successful in securing pharmacy faculty positions. Conclusion Five schools and colleges of pharmacy share similar experiences in implementing community pharmacy research fellowships. Early outcomes show promise for this training pathway in growing future pharmacist-scientists focused on community pharmacy practice. PMID:27083852
Farver, Carol F; Smalling, Susan; Stoller, James K
2016-10-01
Challenges in healthcare demand great leadership. In response, leadership training programs have been developed within academic medical centers, business schools, and healthcare organizations; however, we are unaware of any well-developed programs for physicians-in-training. To address this gap, we developed a two-day leadership development course for chief residents (CRs) at the Cleveland Clinic, framed around the concept of emotional intelligence. This paper describes our five-year experience with the CRs leadership program. Since inception, 105 CRs took the course; 81 (77%) completed before-and-after evaluations. Participants indicated that they had relatively little prior knowledge of the concepts that were presented and that the workshop greatly enhanced their familiarity with leadership competencies. Qualitative analysis of open-ended responses indicated that attendees valued the training, especially in conflict resolution and teamwork, and indicated specific action plans for applying these skills. Furthermore, the workshop spurred some participants to express plans to learn more about leadership competencies. This study extends prior experience in offering an emotional intelligence-based leadership workshop for CRs. Though the program is novel, further research is needed to more fully understand the impact of leadership training for CRs and for the institutions and patients they serve. © The Royal Australian and New Zealand College of Psychiatrists 2016.
ERIC Educational Resources Information Center
District of Columbia Public Schools, 2013
2013-01-01
The 2012-2013 school year represents a pivotal juncture for DC Public Schools. Last spring, Mayor Gray and Chancellor Kaya Henderson introduced "A Capital Commitment," their ambitious plan to dramatically accelerate student achievement in the district over the next five years by providing all of their students with a safe, academically…
ERIC Educational Resources Information Center
District of Columbia Public Schools, 2012
2012-01-01
The 2012-2013 school year represents a pivotal juncture for DC Public Schools. Last spring, Mayor Gray and Chancellor Kaya Henderson introduced "A Capital Commitment," their ambitious plan to dramatically accelerate student achievement in the district over the next five years by providing all of their students with a safe, academically…
NASA Technical Reports Server (NTRS)
1990-01-01
A strategic plan for the U.S. space science and applications program during the next 5 to 10 years was developed and published in 1988. Based on the strategies developed by the advisory committees of both the National Academy of Science and NASA, the plan balances major, moderate, and small mission initiatives, the utilization of the Space Station Freedom, and the requirements for a vital research base. The Office of Space Science and Applications (OSSA) strategic plan is constructed around five actions: establish a set of programmatic themes; establish a set of decision rules; establish a set of priorities for missions and programs within each theme; demonstrate that the strategy will yield a viable program; and check the strategy for consistency within resource constraints. The OSSA plan is revised annually. This OSSA 1990 Strategic Plan refines the 1989 Plan and represents OSSA's initial plan for fulfilling its responsibilities in two major national initiatives. The Plan is now built on interrelated, complementary strategies for the core space science and applications program, for the U.S. Global Change Research Program, and for the Space Exploration Initiative. The challenge is to make sure that the current level of activity is sustained through the end of this century and into the next. The 1990 Plan presents OSSA's strategy to do this.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Mark D.; Price, Lynn; Zhou, Nan
2010-04-28
During the period 1980 to 2002, China experienced a 5% average annual reduction in energy consumption per unit of gross domestic product (GDP). The period 2002-2005 saw a dramatic reversal of the historic relationship between energy use and GDP growth: energy use per unit of GDP increased an average of 3.8% per year during this period (NBS, various years). China's 11th Five Year Plan (FYP), which covers the period 2006-2010, required all government divisions at different levels to reduce energy intensity by 20% in five years in order to regain the relationship between energy and GDP growth experienced during themore » 1980s and 1990s. This report provides an assessment of selected policies and programs that China has instituted in its quest to fulfill the national goal of a 20% reduction in energy intensity by 2010. The report finds that China has made substantial progress toward its goal of achieving 20% energy intensity reduction from 2006 to 2010 and that many of the energy-efficiency programs implemented during the 11th FYP in support of China's 20% energy/GDP reduction goal appear to be on track to meet - or in some cases even exceed - their energy-saving targets. It appears that most of the Ten Key Projects, the Top-1000 Program, and the Small Plant Closure Program are on track to meet or surpass the 11th FYP savings goals. China's appliance standards and labeling program, which was established prior to the 11th FYP, has become very robust during the 11th FYP period. China has greatly enhanced its enforcement of new building energy standards but energy-efficiency programs for buildings retrofits, as well as the goal of adjusting China's economic structure to reduce the share of energy consumed by industry, do not appear to be on track to meet the stated goals. With the implementation of the 11th FYP now bearing fruit, it is important to maintain and strengthen the existing energy-saving policies and programs that are successful while revising programs or adding new policy mechanisms to improve the programs that are not on track to achieve the stated goals.« less
NASA Technical Reports Server (NTRS)
2002-01-01
The purpose of this document is to present the strategic plan and associated organizational structure that the National Space Biomedical Research Institute (NSBRI) will utilize to achieve the defined mission and objectives provided by NASA. Much of the information regarding the background and establishment of the NSBRI by NASA has been provided in other documentation and will not be repeated in this Strategic Plan. This Strategic Plan is presented in two volumes. Volume I (this volume) begins with an Introduction (Section 2) that provides the Institute's NASA-defined mission and objectives, and the organizational structure adopted to implement these through three Strategic Programs: Countermeasure Research; Education, Training and Outreach; and Cooperative Research and Development. These programs are described in Sections 3 to 5. Each program is presented in a similar way, using four subsections: Goals and Objectives; Current Strategies; Gaps and Modifications; and Resource Requirements. Section 6 provides the administrative infrastructure and total budget required to implement the Strategic Programs and assures that they form a single cohesive plan. This plan will ensure continued success of the Institute for the next five years. Volume II of the Strategic Plan provides an in-depth analysis of the current and future strategic programs of the 12 current NSBRI teams, including their goals, objectives, mutual interactions and schedules.
2003-07-01
magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to
Research and Technology Operating Plan Summary: Fiscal Year 1973 Research and Technology Program
NASA Technical Reports Server (NTRS)
1972-01-01
Abstracts are presented of each of the Research and Technology Operating Plans (RTOP) used for management review and control of research currently in progress throughout NASA. This RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The summary is arranged in five sections consisting of citations and abstracts of the RTOPs and subject, technical monitor, responsible NASA organization, and RTOP number indexes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In FY 1990 Robotics Technology Development Program (RTDP) planning teams visited five DOE sites. These sites were selected by the Office of Technology Development to provide a needs basis for developing a 5-Year Plan. Visits to five DOE sites provided identification of needs for robotics technology development to support Environmental Restoration and Waste Management (ER WM) projects at those sites. Additional site visits will be conducted in the future to expand the planning basis. This volume summarizes both the results of the site visits and the needs and requirements of the priority ER WM activities at the sites, including potentialmore » needs for robotics and remote systems technology. It also discusses hazards associated with the site activities and any problems or technical uncertainties associated with dealing with the hazards in the performance of the ER WM work. Robotic or remote systems currently under development for remediation projects or waste operations are also discussed. The information in this document is organized principally by site, activity, and priority. Section 2.0, Site Needs, is based on information from the site visit reports and provides a summary which focuses on the site needs and requirements for each priority activity. Section 2.0 also records evaluations and discussions by the RTDP team following the site visit. Section 3.0, Commonality Assessment, documents similar site needs where common, or cross-cutting, robotics technology might be applied to several activities. Section 4.0 contains a summary of the site needs and requirements in tabular form. 1 tab.« less
Planning and Administration of National Literacy Programmes: The Indian Experience.
ERIC Educational Resources Information Center
Bordia, Anil
In reporting the history and status of the National Adult Education Programme of India (NAEP), a five-year literacy campaign (1979-84) that was designed to educate approximately 100 million persons, this study emphasizes the program's preparatory phase and its monitoring/evaluation systems. After a survey of the literacy needs and past literacy…
76 FR 71977 - Update of the NICEATM-ICCVAM Five-Year Plan: Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
... testing and (2) research, development, translation, and validation of new and revised non-animal and other...-animal and other alternative assays for integration into Federal agency testing programs (ICCVAM, 2008... of areas of high priority for new and revised non-animal and alternative assays to reduce, refine...
One Model of Professional Development for Higher Education Faculty
ERIC Educational Resources Information Center
Amburgey, Valeria
2007-01-01
Northern Kentucky University's College of Education's faculty realizes that the infusion of technology into the teacher education program is important. Support for the infusion of technology was evident when the faculty adopted the ISTE Recommended Foundations for Teachers and a five-year technology plan in 1998. Interviews with the faculty during…
Infection in the Classroom: Parasites as Models to Teach Biology
ERIC Educational Resources Information Center
Seville, R. Scott; Couch, Lee; Seed, Richard; Chappell, Cynthia; Patton, Sharon
2004-01-01
The American Society of Parasitologists established a five-year plan to educate various groups about parasites and parasitology, which were targeted at K-12 students and teachers, college students and teachers and biologists in other disciplines. This program also developed the idea to host a symposium and workshop for these targeted groups.
Planning for Impact: A Guide to Planning Effective Family Program.
ERIC Educational Resources Information Center
Hardy, James M.
A document intended to provide program planning guidelines for Young Men's Christian Associations (YMCAs) desirous of working with families, recommends adherence to eight principles and following of five steps. The principles involve planning before action, fact finding and analysis, clear delineation of operational objectives, planning at all…
Five-Year Strategic Plan: Fiscal Years 2011-2015
ERIC Educational Resources Information Center
US Department of Education, 2010
2010-01-01
This paper presents the U.S. Department of Education (Department) Office of Inspector General (OIG) Strategic Plan for fiscal years 2011 through 2015. This plan describes the focus and direction of OIG's operations over the next five years, establishes its organizational goals, and outlines the strategies it will employ to reach those goals and…
Environmental Implementation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-15
The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.« less
Environmental Implementation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-15
The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognizedmore » model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.« less
Mobil`s Energy Management Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoeneborn, F.C.
1997-06-01
Mobil`s Facilities Management Network sponsored a cross-divisional team to reduce energy costs. This team developed an Energy Management Plan to reduce energy costs by $25 million annually throughout all Mobil divisions over the next five years (total of $125 million committed savings). The core of this plan is the belief that energy costs are controllable and should be managed with the expertise that Mobil manages other parts of the business. Areas of focus are economic procurement, efficient consumption, and expertise sharing.
It was huge! Nursing students' first experience at AORN Congress.
Byrne, Michelle; Cantrell, Kelly; Fletcher, Daphne; McRaney, David; Morris, Kelly
2004-01-01
AN EXPERIENTIAL KNOWLEDGE of mentoring through nursing students' perspectives may enhance AORN's ability to recruit students to perioperative nursing and aid future planning for student involvement in the Association. IN 2003, four first-year nursing students attended the AORN Congress in Chicago with their nursing instructor and mentor. The students' experiences were captured using a thematic analysis to analyze their journals. THE FIVE COMMON THEMES identified were "it was huge," "exhibits," "student program," "exploring the city," and "suggestions for future planning."
1978-10-01
Information ; Logistics Planning; Management Planning and Control; Management Information Systems; Management; Military Supplies; Acquisition; JO...Arlington, Virginia 22202 Contract DAHC 15-73C-0200 Task 78-II-1 CONTENTS GLOSSARY : v SUMMARY ix I. INTRODUCTION 1 II. MARINE CORPS SUPPORT OP...Materiel Command Navy Cost Information System/FYDP Subsystem Non-Industrial Fund Non-Telecommunications Offfice of the Assistant Secretary of Defense
Purtell, Kelly M.; McLoyd, Vonnie C.
2012-01-01
Planning and preparing for life after high school is a central developmental task of American adolescents, and may be even more critical for low-income youth who are less likely to attend a four year college. This study investigates factors that led to the effects of the New Hope Project, a work-based, anti-poverty program directed at parents on youths’ career-related thoughts and planning. The New Hope project was implemented in Milwaukee, WI, during the mid-1990s. 745 families participated (52% male children; 56% African American; 30% Latino, and 15% White non-Hispanic) and half were randomly selected to receive New Hope benefits, which included earnings supplements, job search assistance, and child and health care subsidies for three years. Importantly, effects on youths’ future orientation were found eight years after the program began (five years after benefits ended). The present study investigates what factors sustained these positive impacts over time. Results indicate that parental perceptions of reading performance mediate the effects of New Hope on youths’ cynicism about work. Additionally, parental perceptions of reading performance and youths’ educational expectations mediate the effects of New Hope on boys’ pessimism about future employment. These findings highlight the importance of youths’ educational development to their career-related thoughts and planning. PMID:22878938
Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008
ERIC Educational Resources Information Center
US Department of Education, 2004
2004-01-01
The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…
Creating an "Education Shark Tank" to Encourage and Support Educational Scholarship and Innovation.
Cofrancesco, Joseph; Wright, Scott M; Vohr, Eric; Ziegelstein, Roy C
2017-11-01
Creating and supporting opportunities for innovation that showcase and reward creativity in medical and biomedical education is critically important for academic institutions, learners, and faculty. In 2014, the Institute for Excellence in Education at Johns Hopkins University School of Medicine created a small grant program called Education Shark Tank, in which two to five finalist teams present their proposals on innovative initiatives to improve education to four or five senior educator "sharks" at an educational conference, with an audience. The sharks then "grill" the presenters, considering which if any to fund, focusing on the rationale, feasibility, appropriateness of the outcome measures, evaluation and assessment plan, and proposed method of dissemination. They also make suggestions that challenge the presenters to assess and improve their designs. In the program's first year (2014), funds were divided equally between two projects, both of which were successfully completed and one of which led to a journal publication; this led to increased funding for the program in 2015. Participants have called Education Shark Tank a "challenging and rewarding experience." Education Shark Tank can facilitate educational innovation and scholarship via engaging and challenging interactions between grant applicants and reviewers in a public venue. The authors plan to conduct a five-year survey (after 2018) of all Education Shark Tank finalists to determine the success and challenges the funded projects have had, what scholarly dissemination has occurred, whether nonfunded projects were able to move forward, and the value of the feedback and mentoring received.
ERIC Educational Resources Information Center
Galligani, Dennis J.
This first volume of the University of California, Irvine, (UCI) Student Affirmative Action (SAA) Five-Year Plan provides an overview of the plan and the planning process, lists campus SAA goals and objectives, summarizes campus SAA activities, and describes the research and evaluation components of the plan. Topics include: the historical context…
Townsend, Julie S.; Moore, Angela R.; Mulder, Tiffani N.; Boyd, Mary
2015-01-01
Context The National Comprehensive Cancer Control Program (NCCCP) performance measurement system seeks to understand both the processes that funded programs undertake with their respective coalitions to implement the objectives of their cancer plans and outcomes of those efforts. Objective To identify areas of achievement and technical assistance needs of NCCCP awardees. Design Program performance was assessed through surveys completed by program directors on performance indicators in 2009 and 2010 and queries from a web-based management information system in 2011 and 2012. Setting Programs funded by CDC’s NCCCP. Participants 69 programs. Main Outcome Measure(s) The key performance measures assessed were: inclusion of diverse partners and key sectors in cancer coalitions; partners’ involvement in activities; receiving in-kind resources from partners; using evidence-based interventions and data for setting priorities; conducting program evaluation; using community- or organization-level strategies to address cancer control efforts; and demonstrating progress toward achieving health outcomes. Results Most programs reported having active coalitions that represent diverse organizational sectors. Nearly all programs routinely assess the burden of cancer. In-kind resources to implement activities peaked at $64,716 in the second year of a five year funding cycle, and declined in subsequent project years. By year 3, over 70% of programs reported having an evaluation plan. While programs reported that nearly two-thirds of their interventions were evidence-based, some programs implemented non-evidence-based interventions. A majority of programs successfully used at least one community- or organization-level change strategy. However, many programs did not incorporate objectives linked to health outcomes as they reported progress in implementing interventions. Conclusions: While NCCCP programs were strong at building and maintaining infrastructure, some programs may need additional technical assistance to increase the adoption of evidence-based interventions, develop solid and responsive evaluation plans, and better link efforts to population-based measures that demonstrate impact toward reducing the burden of cancer. PMID:25136936
ERIC Educational Resources Information Center
Brown, Irving A.; Davis, Trina J.; Kulm, Gerald
2011-01-01
This article presents our plans and initial work to explore how mathematics teacher education programs can prepare teachers for diverse middle grades classrooms. It describes the start-up of a five-year National Science Foundation project to design, develop, and test technology-enriched teacher preparation strategies to address equity in algebra…
In Final Months, Education Department Seeks Teachers' Advice
ERIC Educational Resources Information Center
Hoff, David J.; Keller, Bess
2008-01-01
This article reports that by next fall--only months before she leaves office--U.S. Secretary of Education Margaret Spellings plans to have five teachers on her staff and set up a group of 20 ad hoc advisers still working in classrooms. Under the Teaching Ambassador Fellowship program the teachers would work at the department for one year starting…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... innovations are driving transformative changes in toxicology and how safety testing is performed. The field of toxicology is evolving from a system based largely on animal testing toward one based on the integration of... methods that protect human and animal health and the environment while reducing, refining (enhancing...
The Five-Year Resume: A Career Planning Exercise
ERIC Educational Resources Information Center
Laker, Dennis R.; Laker, Ruth
2007-01-01
For most college students, lack of career planning wastes time and resources and may result in years of "career drift." Lack of planning can also lead to deception once students begin seeking career-related employment. Faced with a competitive job market, some students inflate and exaggerate their resumes. The five-year resume exercise helps…
ERIC Educational Resources Information Center
New York State Library, Albany.
This annual report on the comprehensive five-year program for the enhancement of libraries in New York State achieves the following: (1) provides a benchmark for the continuing planning, development, and evaluation of state library services; (2) summarizes the objectives, policies, and programs undertaken for the improvement of those services; (3)…
Samal, Janmejaya; Dehury, Ranjit Kumar
2016-05-01
Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1(st) five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11(th) five year plan. A very strong optimistic approach in spreading India's own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India's own medical inheritance for the welfare of the society at large is highly desirable.
Dehury, Ranjit Kumar
2016-01-01
Introduction Indian system of medicine has its origin in India. The system is currently renamed as AYUSH, an acronym for Ayurveda, Yoga & Naturopathy, Unani, Sidha and Homeopathy. These are the six Indian systems of medicine prevalent and practiced in India and in few neighboring Asian countries. Objective The primary objective of this review was to gain insight in to the prior and existing initiatives which would enable reflection and assist in the identification of future change. Materials and Methods A review was carried out based on the five year plan documents, obtained from the planning commission web portal of Govt. of India, on medical education, research and development of AYUSH systems of medicine. Results Post independence, the process of five year planning took its birth with the initiation of long term planning in India. The planning process embraced all the social and technology sectors in it. Since the beginning of five year planning, health and family welfare planning became imperative as a social sector planning. Planning regarding Indian Systems of Medicine became a part of health and family welfare planning since then. During the entire planning process a progressive path of development could be observed as per this evaluation. A relatively sluggish process of development was observed up to seventh plan however post eighth plan the growth took its pace. Eighth plan onwards several innovative development processes could be noticed. Despite the relative developments and growth of Indian systems of medicine these systems have to face lot of criticism and appraisal owing to their various characteristic features. In the beginning the system thrived with great degree of uncertainty, as described in 1st five year plan, however progressed ahead with a vision to be a globally accepted system, as envisaged in 11th five year plan. Conclusion A very strong optimistic approach in spreading India’s own medical heritage is the need of the hour. The efforts are neither completely insufficient nor sufficient enough; hence a continuous endeavor for the revival and dissemination of India’s own medical inheritance for the welfare of the society at large is highly desirable. PMID:27437245
Project Planning and Reporting
NASA Technical Reports Server (NTRS)
1982-01-01
Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.
NASA Astrophysics Data System (ADS)
Arthurs, L.; Budd, D. A.
2009-12-01
The Science Education Initiative (SEI) at the University of Colorado at Boulder was conceived in 2006 with the goal of improving science education at the undergraduate level by changing the basic approach to teaching in science departments. Five departments were selected on a competitive basis for participation in the SEI. The SEI is operating as a five year plan with funding of ~$1 million/year for the five departments. The goal of the SEI is to implement sustainable department-level change for an evidence-based and scientific approach to teaching. Among the five departments receiving funding for discipline-specific SEI projects is the Department of Geological Sciences (GEOL-SEI). The GEOL-SEI has worked to transform geology courses beginning with lower division large enrollment courses and moving towards upper division courses. They are transformed on the basis of existing research into how people learn, and they are characterized by the use of learning goals and effective instructional approaches. Furthermore, a natural component of the transformation towards evidence-based and scientific approaches to teaching is geocognition and geoscience education research. This research focuses on how students think about geologic concepts (e.g. misconceptions) and the effectiveness of different instructional approaches (e.g. the implementation of instructional technologies, peer learning activities, homework, and labs). The research is conducted by post-doctoral fellows (with PhDs in geology and pedagogical training) in collaboration with the instructional faculty members. The directorate of CU’s Science Education Initiative provides the fellows with training useful for conducting the research. Currently, into the 4th year of its 5-year plan, the GEOL-SEI is working towards publishing its findings and exploring options for sustaining various changes made to courses and new departmental programs that support student learning (e.g. GEOL Tutoring & Study Room).
Responses of Canada's health care management education programs to health care reform initiatives.
Angus, D E; Lay, C M
2000-01-01
Canada's provincial health care systems have been experiencing significant changes, mostly through horizontal integration achieved by merging hospitals, and, in a few cases, through vertical integration of public health, long term care, home care and hospital services. The government motivation for forcing these changes seems to have been primarily financial. In a few cases, the integration seems to have resulted in a stable and successful outcome, but, in most others, there has been destabilization, and in some, there has been chaos. The question posed in this research was how the five accredited Canadian graduate programs in health care management were responding to these changes. Two of the programs have recently made major changes in structure and/or delivery processes, following careful examination of their perceived environments. One has rationalized by subdividing courses. Another is repatriating courses from the business school in order to achieve more health-related content. Four of the five programs have added a number of courses in the last few years, or plan to do so in the next year or two, either because of accreditation criteria or student or faculty interest. The program directors viewed the educational requirements for clinicians and non-clinicians as being identical. In spite of the major structural changes, and the resulting destabilization of the health care organizations (and even governments), none of the programs emphasized the changes as factors in their plans for program changes. They expressed some concern about the possibility of fads as opposed to significant changes. It may be that these changes are dealt with in the content of individual courses. This aspect was not examined by the survey nor by interviews with the directors. Each of the programs has emphasized its own niche, with no consensus about changes required.
ERIC Educational Resources Information Center
Jaques, Thomas F.
This document presents the five year library plan for public libraries in Louisiana. It identifies the specific inadequacies in public library services, resources, facilities, and personnel; identifies the people who are to be served; reveals the geographical, sociological, economic, and educational barriers to the expanded use of libraries; and…
ERIC Educational Resources Information Center
Kentucky State Dept. of Libraries, Frankfort.
This document is the beginning of a process. The objects of the process are to improve decisions between alternate choices in the development of statewide library services. Secondary functions are to develop the tools for providing information relevant to decisions, to measure and monitor services, and to aid in the communication process. The…
ERIC Educational Resources Information Center
Commission on Civil Rights, Washington, DC.
This is a report of school desegregation in Greenville, Mississippi. In 1964, five years before ordered to do so by a federal judge, Greenville initiated its own plan for majority-to-minority crossover of students on a "freedom of choice" basis. The school board also initiated a voluntary teacher transfer program that met with…
ERIC Educational Resources Information Center
Hussin
This UNESCO report describes the progress of primary school building development under the second Five Year Plan of the Government of Indonesia. The main objective of the construction program was to increase the enrollement of children of primary school age to 85 per cent of all eligible children. Chapter I provides an historical perspective on…
Current status and future directions of the population control policies in Korea.
Cho, N H; Seo, M H
1989-07-01
Recent changes in demographic and socioeconomic conditions in Korea are reviewed, as are population control policies so that future policy directions can be established. Major data sources include the 1988 National Fertility and Family Health Survey and the 1985 Population and Housing Census of NBOS, EPB. The Korean population increased from 25.0 million in 1960 to 42.4 million in 1989. Population growth rate declined from 3.0% per annum to l.0% at the same time. The total fertility rate went down from 6.0/women to 1.6, from 1960 to 1987. This was due to a family planning program and socioeconomic development. In the Sixth Five-Year Plan (1987-1991), the government changed the demographic goals to further reduce the population growth rate to 0.96% by 1991. The estimated 1987 population of 41.6 million should reach 43.2 million by 1991. Korea will face 3 major population problems: an increase of the elderly population, rapid urbanization and shortage of resources. Emigration programs have been carried out to relieve the pressure of population. For the last 29 years, rural to urban migration has existed. A national family planning program exists. 16.4 million acceptors have received contraception under this program. There are, however, a number of problems. Reduction in population growth will help the world food supply problem and the housing shortage. Energy use has grown. Population and environmental planning should work together. Goals should change from reduction of fertility to eliminating problems with contraceptive acceptance and use effectiveness. There should be a greater choice of methods of contraception. The government functions of the family planning program should be given over to private organizations. The family planning program should be integrated with public health programs. Acceptors should pay for their contraceptives. The family planning program should enlarge its realm of activities. The information, education, communication part of the program should be revised. Individual program activities should be evaluated. Appendix 1 presents new population projections for 1987-2020. Changes in composition of the population are given in table form in Appendix 2.
Plans and status of the NASA-Lewis Research Center wind energy project
NASA Technical Reports Server (NTRS)
Thomas, R.; Puthoff, R.; Savino, J.; Johnson, W.
1975-01-01
This report describes that portion of the national five-year wind energy program that is being managed by the NASA-Lewis Research Center for the ERDA. The Lewis Research Center's Wind Power Office, its organization and plans and status are briefly described. The three major elements of the wind energy project at Lewis are the experimental 100 kW wind-turbine generator; the first generation industry-built and user-operated wind turbine generators; and the supporting research and technology tasks which are each briefly described.
Women's experiences after Planned Parenthood's exclusion from a family planning program in Texas.
Woo, C Junda; Alamgir, Hasanat; Potter, Joseph E
2016-04-01
We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006-2010 (NSFG). (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Requiring low-income family planning patients to switch healthcare providers has adverse consequences. Copyright © 2016 Elsevier Inc. All rights reserved.
Women’s experiences after Planned Parenthood’s exclusion from a family planning program in Texas☆
Woo, C. Junda; Alamgir, Hasanat; Potter, Joseph E.
2016-01-01
Objective We assessed the impact on depot medroxyprogesterone continuation when a large care provider was banned from a state-funded family planning program. Study Design We used three methods to assess the effect of the ban: (a) In a records review, we compared how many state program participants returned to two Planned Parenthood affiliates for a scheduled dose of depot medroxyprogesterone acetate (DMPA) immediately after the ban; (b) We conducted phone interviews with 224 former Planned Parenthood patients about DMPA use and access to contraception immediately after the ban; (c) We compared current contraceptive method of our interviewees to that of comparable DMPA users in the National Survey of Family Growth 2006–2010 (NSFG). Results (a) Fewer program clients returned for DMPA at a large urban Planned Parenthood, compared to a remotely located affiliate (14.4%, vs. 64.8%), reflecting different levels of access to alternative providers in the two cities. (b) Among program participants who went elsewhere for the injection, only 56.8% obtained it at no cost and on time. More than one in five women missed a dose because of barriers, most commonly due to difficulty finding a provider. (c) Compared to NSFG participants, our interviewees used less effective methods of contraception, even more than a year after the ban went into effect. Conclusions Injectable contraception use was disrupted during the rollout of the state-funded family planning program. Women living in a remote area of Texas encountered more barriers. Implications Requiring low-income family planning patients to switch healthcare providers has adverse consequences. PMID:26680757
National Geomagnetism Program: Current Status & Five-Year Plan, 2006-2010
Love, Jeffrey J.
2006-01-01
Executive Summary: The U.S. Geological Survey's Geomagnetism Program serves the scientific community and the broader public by collecting and distributing magnetometer data from an array of ground-based observatories and by conducting scientific analysis on those data. Preliminary, variational time-series can be collected and distributed in near-real time, while fully calibrated, absolute time-series are distributed after processing. The data are used by the civilian and military parts of the Federal Government, by private industry, and by academia, for a wide variety of purposes of both immediately practical importance and long-term scientific interest, including space-weather diagnosis and related hazard mitigation, mapping of the magnetic field and measurement of its activity, and research on the nature of the Earth's interior and the near-Earth space environment. This document reviews the current status of the Program, in terms of its situation within the Government and within the scientific community; summarizes the Program's operations, its staffing situation, and its facilities; describes the diversity of uses of Program magnetometer data; and presents a plan for the next 5 years for enhancing the Program's data-based services, developing products, and conducting scientific research.
The Chief Joseph Hatchery Program 2013 Annual Report
Baldwin, Casey; Pearl, Andrea; Laramie, Matthew; Rohrback, John; Phillips, Pat; Wolf, Keith
2016-01-01
The Chief Joseph Hatchery is the fourth hatchery obligated under the Grand Coulee Dam/Dry Falls project, originating in the 1940s. Leavenworth, Entiat, and Winthrop National Fish Hatcheries were built and operated as mitigation for salmon blockage at Grand Coulee Dam, but the fourth hatchery was not built, and the obligation was nearly forgotten. After the Colville Tribes successfully collaborated with the United States to resurrect the project, planning of the hatchery began in 2001 and construction was completed in 2013. The monitoring program began in 2012 and adult Chinook Salmon were brought on station for the first time in June 2013. BPA is the primary funding source for CJH, and the Mid-Columbia PUDs (Douglas, Grant and Chelan County) have entered into cost-share agreements with the tribes and BPA in order to meet some of their mitigation obligations. The CJH production level was set at 60% in 2013 in order to train staff and test hatchery facility systems during the first year of operation. Leavenworth National Fish Hatchery (LNFH) provided 422 Spring Chinook broodstock in June, 2013; representing the official beginning of CJH operations. In July and August the CCT used a purse seine vessel to collect 814 summer/fall Chinook as broodstock that were a continuation and expansion of the previous Similkameen Pond program. In-hatchery survival for most life stages exceeded survival targets and, as of April 2014, the program was on track to exceed the 60% production target for its start-up year. The CJH monitoring project collected field data to determine Chinook population status, trend, and hatchery effectiveness centered on five major activities; 1) rotary screw traps (juvenile outmigration, natural-origin smolt PIT tagging) 2) beach seine (naturalorigin smolt PIT tagging) 3) lower Okanogan adult fish pilot weir (adult escapement, proportion of hatchery-origin spawners [pHOS], broodstock) 4) spawning ground surveys (redd and carcass surveys)(viable salmonid population [VSP] parameters) 5) eDNA collection (VSP parameter—distribution/spatial structure). Adult summer/fall Chinook spawning escapement in 2013 was estimated to be 8,193, with more than 6,227 natural-origin spawners, which exceeded the recent five year and long term averages. The values for pHOS (0.24) and proportion of natural influence (PNI) (0.79) in 2013 exceeded the objectives (0.67), but the five year averages fell short of the goals (0.39 and 0.62, respectively). An Annual Program Review (APR) was held in March, 2014 to share hatchery production and monitoring data, review the salmon forecast for the upcoming year, and develop action plans for the hatchery, selective harvest, and monitoring projects. Based on a strong pre-season forecast of 67,500 Upper Columbia summer/fall Chinook, the plan for 2014 is to operate the hatchery at full program levels of 2 million summer/fall Chinook and 900,000 spring Chinook. To maximize PNI, broodstock for the integrated program should Chief Joseph Hatchery Program 2013 Annual Report 3 be 100% natural-origin broodstock (NOB) and CCT should plan to harvest their full allocation with the selective harvest program removing as many adult hatchery Chinook as possible with the purse seine, the weir, and at the hatchery ladder.
DOT National Transportation Integrated Search
1997-12-01
In the fall of 1997, the ITS Professional Capacity Building Program initiated the development of six White Papers to briefly describe the current status of, and plans for future education and training activities of six organizations engaged in ...
ERIC Educational Resources Information Center
Galligani, Dennis J.
This second volume of the University of California, Irvine (UCI), Student Affirmative Action (SAA) Five-Year Plan contains the complete student affirmative action plans as submitted by 33 academic and administrative units at UCI. The volume is organized by type of unit: academic units, academic retention units, outreach units, and student life…
A Technology Plan for Enabling Commercial Space Business
NASA Technical Reports Server (NTRS)
Lyles, Garry M.
1997-01-01
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
Measuring the effectiveness of contraceptive marketing programs: Preethi in Sri Lanka.
Davies, J; Louis, T D
1977-04-01
The Preethi marketing program resulted in sales of more than 11 million condoms during its first 33 months, multiplying Sri Lanka's annual per capita condom use by a factor of five. Estimates for 1974 show 144,000 new acceptors (8% of married women of reproductive age), totaling 50,000 couple-years of protection. It is also estimated that more than half of the nation's 1.8 million couples of childbearing age were educated about the function of a condom. Unit costs were low for this new, nationwide program: about US $2.00 for each new acceptor; 6.00 dollars for each couple-year of protection; and 0.09 dollars for each couple educated. The program's success suggests that a social marketing approach can advance family planning at a relatively low cost.
Serxner, Seth; Alberti, Angela; Weinberger, Sarah
2012-01-01
To compare changes in medical costs between participants and nonparticipants in five different health and productivity management (HPM) programs. Quasi-experimental pre/post intervention study. A large financial services corporation. A cohort population of employees enrolled in medical plans (n = 49,723) [corrected]. A comprehensive HPM program, which addressed health risks, acute and chronic conditions, and psychosocial disorders from 2005 to 2007. Incentives were used to encourage health risk assessment participation in years 2 and 3. Program participation and medical claims data were collected for members at the end of each program year to assess the change in total costs from the baseline period. Analysis . Multivariate analyses for participation categories were conducted comparing baseline versus program year cost differences, controlling for demographics. All participation categories yielded a lower cost increase compared to nonparticipation and a positive return on investment (ROI) for years 2 and 3, resulting in a 2.45∶1 ROI for the combined program years. Medical cost savings exceeded program costs in a wide variety of health and productivity management programs by the second year.
Medicare Part D: Are Insurers Gaming the Low Income Subsidy Design?
Decarolis, Francesco
2015-04-01
This paper shows how in Medicare Part D insurers' gaming of the subsidy paid to low-income enrollees distorts premiums and raises the program cost. Using plan-level data from the first five years of the program, I find multiple instances of pricing strategy distortions for the largest insurers. Instrumental variable estimates indicate that the changes in a concentration index measuring the manipulability of the subsidy can explain a large share of the premium growth observed between 2006 and 2011. Removing this distortion could reduce the cost of the program without worsening consumer welfare.
California State University Long Beach: Model for a Terminal Master's Program as a Bridge to PhD
NASA Astrophysics Data System (ADS)
Bill, Andreas; Kenealy, Patrick; Kwon, Chuhee; Papp, Zoltan; Pickett, Galen T.
The department of Physics & Astronomy at California State University Long Beach has redesigned its Master's program in 2008 with the goal to provide a true graduate experience in Physics. The hallmarks of the program are five core graduate courses and a research-based MS thesis. During the last five years, 42% of MS recipients (24 students) were accepted to PhD programs, 41% started private-sector STEM careers, and 17% decided on teaching and other paths. The program doubled in size during that period. In 2013 we also became one of six Bridge Sites and only non-PhD granting institution of the American Physical Society (APS). We will describe the structure of the MS program, its goals and its place in the University degree plan landscape. We will also discuss how the APS Bridge Program has been implemented in our institution and has influenced our MS program. We gratefully acknowledge support from a variety of sources that contributed to establish the MS program, including the APS Bridge Program, individual NSF and Army Research Laboratory Grants.
Scientific life should be measured in seven year units.
Charlton, Bruce G
2006-01-01
Traditional wisdom and empirical observation unite in recommending a 7 year unit for measuring human life - including individual and institutional science. But, because of astronomy and the decimal system, things tend to be measured either in years, five years or in decades. A year is too short while a decade is too long to measure the trends and transitions of individual or institutional life. And the half decade, such as the 'five year plan' beloved by politicians and bureaucrats seems too short. Therefore, seven years should become the standard unit for tracking trends and measuring attainment. Precedents for using a seven year unit include the notorious Jesuit saying: 'Give me the child until he is seven, and I will show you the man'; and the 'ninth commandment' of Leo Szilard: 'Do your work for six years; but in the seventh, go into solitude or among strangers, so that the memory of your friends does not prevent you from being what you have become'. In a scientific career, seven years is approximately the time spent at high school, the time taken for a traditional basic scientific training of first degree and doctorate, and the period after the doctorate building the knowledge to become an expert specialist. There seems to be enough anecdotal evidence to support the idea that we should reconsider the universal but un-reflective use of decimal units in planning and evaluation. For instance, seven year fellowships and program grants might replace the current five year versions. A new - and previously unconsidered - field of research beckons.
Evaluation of a women group led health communication program in Haryana, India.
Kaur, Manmeet; Jaswal, Nidhi; Saddi, Anil Kumar
2017-12-01
Sakshar Mahila Smooh (SMS) program was launched in rural areas of Haryana in India during 2008. A total of 6788 SMSs, each having 5-10 literate women, were equipped to enhance health communication. We carried out process evaluation of this program as an external agency. After a review of program documents, a random sample survey of Auxiliary Nurse Midwives (ANMs), SMS members, and village women was conducted. Out of four divisions of the state, one was randomly chosen, which had five districts. From 330 randomly chosen villages, 283 ANMs, 1164 SMS members, and 1123 village women were interviewed using a semi- structured interview schedule. Program inputs, processes, and outputs were compared in the five districts. Chi square was used for significance test. In the sampled division, out of 2009 villages, 1732 (86%) had functional SMS. In three years, SMS conducted 15036 group meetings, 2795 rallies, 2048 wall writings, and 803 competitions, and 44.5% of allocated budget was utilized. Most ANMs opined that SMSs are better health communicators. SMS members were aware about their roles and responsibilities. Majority of village women reported that SMS carry out useful health education activities. The characteristics of SMS members were similar but program performance was better in districts where health managers were proactive in program planning and monitoring. SMS Program has communicated health messages to majority of rural population, however, better planning & monitoring can improve program performance. Copyright © 2017 Elsevier Ltd. All rights reserved.
Rahal, Boushra; Mansour, Nabil; Zaatari, Ghazi
2015-01-01
The American University of Beirut Faculty of Medicine (AUB-FM) strategy is to develop faculty members (fm) skills by sponsoring local and international scientific activities has been in place for over three decades, and remains dependent on individuals' efforts. In 2011-2012, Faculty Development Program (FDP) was introduced to develop faculty leadership, business skills in medicine, fulfill personal and professional goals, followed by a five-year plan to cover five themes: Management/Leadership, Marketing, Finance, Strategic Planning and Communications with the purpose of integrating these themes in medical practice. A survey was sent to all departments at AUB-FM in 2011 to assess needs and determine themes. Nine workshops were conducted, followed by post-workshop evaluation. 117 fm responded to needs assessment surveys. Respondents had on average 15 years in clinical practice, 50% with extensive to moderate administrative experience; 71% assumed administrative responsibilities at least once, 56% in leadership positions. Faculty attendance dropped midway from 69 to 19, although workshops were rated very good to excellent. Although faculty were interested in FDP, the drop in attendance might be attributed to: challenges to achieve personal and professional goals while struggling to fulfill their roles, satisfy promotion requirements and generate their income. FDP has to be aligned with FM strategic goals and faculty objectives, be complimentary to a faculty mentoring program, provide rewards, and be supported by a faculty progression tool.
Reece, E Albert; Nugent, Olan; Wheeler, Richard P; Smith, Charles W; Hough, Aubrey J; Winter, Charles
2008-01-01
Performance-Based Incentive Compensation (PBIC) plans currently prevail throughout industry and have repeatedly demonstrated effectiveness as powerful motivational tools for attracting and retaining top talent, enhancing key indicators, increasing employee productivity, and, ultimately, enhancing mission-based parameters. The University of Arkansas for Medical Sciences (UAMS) College of Medicine introduced its PBIC plan to further the transition of the college to a high-performing academic and clinical enterprise. A forward-thinking compensation plan was progressively implemented during a three-year period. After the introduction of an aggressive five-year vision plan in 2002, the college introduced a PBIC plan designed to ensure the retention and recruitment of high-quality faculty through the use of uncapped salaries that reflect each faculty member's clinical, research, and education duties. The PBIC plan was introduced with broad, schoolwide principles adaptable to each department and purposely flexible to allow for tailor-made algorithms to fit the specific approaches required by individual departments. As of July 2006, the college had begun to reap a variety of short-term benefits from Phase I of its PBIC program, including increases in revenue and faculty salaries, and increased faculty morale and satisfaction.Successful implementation of a PBIC plan depends on a host of factors, including the development of a process for evaluating performance that is considered fair and reliable to the entire faculty. The college has become more efficient and effective by adopting such a program, which has helped it to increase overall productivity. The PBIC program continues to challenge our faculty members to attain their highest potential while rewarding them accordingly.
NASA Microgravity Science and Applications Program
NASA Technical Reports Server (NTRS)
1992-01-01
Key elements of the microgravity research program as conducted by the Microgravity Science and Applications Division (MSAD) within the Office of Space Science and Applications (OSSA) during fiscal year (FY) 1992 are described. This NASA funded program supported investigators from the university, industry, and government research communities. The program's goals, the approach taken to achieve those goals, and the resources that were available are summarized. It provides a 'snapshot' of the Program's status at the end of FY 1992 and reviews highlights and progress in the ground and flight-based research during the year. It also describes four major space missions that flew during FY 1992, the advanced technology development (ATD) activities, and the plans to use the research potential of Space Station Freedom and other advanced carriers. The MSAD program structure encompassed five research areas: (1) Biotechnology, (2) Combustion Science, (3) Fluid Physics, (4) Materials Science, and (5) Benchmark Physics.
Environmental Implementation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less
ERIC Educational Resources Information Center
Bossone, Richard M., Ed.
This report summarizes the proceedings and presents the papers discussed at a national conference on effective aspects of urban education. The first paper discusses the development of the San Francisco (California) Redesign Program, a five year master plan for educational reform which aimed to improve the physical educational environment,…
ERIC Educational Resources Information Center
Pinnell, Charles; Wacholder, Michael
The fourth of a five-volume series concerned with higher educational planning provides techniques for the estimation of an institution's facility requirements. The facilities are discussed within the framework of two broad categories--(1) academic program facilities, and (2) residential housing facilities. The academic program facilities provide…
Beyond the dual degree: development of a five-year program in leadership for medical undergraduates.
Crites, Gerald E; Ebert, James R; Schuster, Richard J; Shuster, Richard J
2008-01-01
The current state of physician leadership education consists mainly of executive degree programs designed for midcareer physicians. In 2004, the authors proposed that, by educating medical students in physician leadership and integrating this with a business management or public health degree program, graduates, health care organizations, and communities would benefit sooner. Given the lack of program models to guide program integration and development, the authors began a one-year inquiry to build a model leadership curriculum and integrate leadership education across degree programs. The qualitative inquiry resulted in several linked tasks. First, the authors identified a feasible method for concurrently delivering all three program components (MD degree, Leadership Curriculum, and MBA or MPH degree) during a five-year plan. Second, the authors chose a competency-based educational framework for leadership and then identified, adapted, and validated existing leadership competencies to their context. Third, the authors performed an extensive program alignment to identify existing overlaps and opportunities for integration within and across program components. Fourth, the authors performed a needs analysis to identify educational gaps, subsequently leading to redesigning two courses and to designing three new courses. A description of the Leadership Curriculum is also provided. This inquiry has led to the development of the Boonshoft Physician Leadership Development Program, which provides physician leadership education integrated with medical education and education in business management or public heath. Future program initiatives include developing leadership student assessment tools and testing the link between program activities and short- and long-term outcome measures of program success.
NASA Astrophysics Data System (ADS)
Kavic, Michael; Wiita, P. J.; Benoit, M.; Magee, N.
2013-01-01
IMPRESS-Ed is a program designed to provide authentic summer research experiences in the space, earth, and atmospheric sciences for pre-service K-12 educators at Long Island University (LIU) and The College of New Jersey (TCNJ). In 2011 and 2012, the program involved five students and took place over eight weeks with recruitment occurring during the preceding academic year. The program was divided into two modules: A common core module and an individual mentored research experience. The common module consisted of three units focusing on data-driven pedagogical approaches in astrophysics, tectonophysics, and atmospheric science, respectively. The common module also featured training sessions in observational astronomy, and use of a 3D geowall and state of the art planetarium. Participants in the program are also offered the opportunity to utilize the available TCNJ facilities with their future students. The individual mentored research module matched student interests with potential projects. All five students demonstrated strong gains in earth and space science literacy compared to a baseline measurement. Each student also reported gaining confidence to incorporate data and research-driven instruction in the space and earth sciences into the K-12 STEM classroom setting. All five research projects were also quite successful: several of the students plan to continue research during the academic year and two students are presenting research findings as first authors here at AAS. Other research results are likely to be presented at this year's American Geophysical Union meeting.
Fourth Five-Year Plan, 1969-1974. Draft.
ERIC Educational Resources Information Center
Planning Commission, New Delhi (India).
This document is an English language abstract (approximately 1,500 words) of the Fourth Indian Five Year Plan Report, Chapter 15, which deals with Education and Manpower. India's tasks in providing educational facilities for children in the 6-14 age group are immense. Only about 60% of that age group are in school today. The Plan refers to this…
NASA Astrophysics Data System (ADS)
This Strategic Plan was developed by the Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) through its Committee on Education and Human Resources (CEHR), with representatives from 16 Federal agencies. Based on two years of coordinated interagency effort, the Plan confirms the Federal Government's commitment to ensuring the health and well-being of science, mathematics, engineering, and technology education at all levels and in all sectors (i.e., elementary and secondary, undergraduate, graduate, public understanding of science, and technology education). The Plan represents the Federal Government's efforts to develop a five-year planning framework and associated milestones that focus Federal planning and the resources of the participating agencies toward achieving the requisite or expected level of mathematics and science competence by all students. The priority framework outlines the strategic objectives, implementation priorities, and components for the Strategic Plan and serves as a road map for the Plan. The Plan endorses a broad range of ongoing activities, including continued Federal support for graduate education as the backbone of our country's research and development enterprise. The Plan also identifies three tiers of program activities with goals that address issues in science, mathematics, engineering, and technology education meriting special attention. Within each tier, individual agency programs play important and often unique roles that strengthen the aggregate portfolio. The three tiers are presented in descending order of priority: (1) reforming the formal education system; (2) expanding participation and access; and (3) enabling activities.
NASA Technical Reports Server (NTRS)
1993-01-01
This Strategic Plan was developed by the Federal Coordinating Council for Science, Engineering, and Technology (FCCSET) through its Committee on Education and Human Resources (CEHR), with representatives from 16 Federal agencies. Based on two years of coordinated interagency effort, the Plan confirms the Federal Government's commitment to ensuring the health and well-being of science, mathematics, engineering, and technology education at all levels and in all sectors (i.e., elementary and secondary, undergraduate, graduate, public understanding of science, and technology education). The Plan represents the Federal Government's efforts to develop a five-year planning framework and associated milestones that focus Federal planning and the resources of the participating agencies toward achieving the requisite or expected level of mathematics and science competence by all students. The priority framework outlines the strategic objectives, implementation priorities, and components for the Strategic Plan and serves as a road map for the Plan. The Plan endorses a broad range of ongoing activities, including continued Federal support for graduate education as the backbone of our country's research and development enterprise. The Plan also identifies three tiers of program activities with goals that address issues in science, mathematics, engineering, and technology education meriting special attention. Within each tier, individual agency programs play important and often unique roles that strengthen the aggregate portfolio. The three tiers are presented in descending order of priority: (1) reforming the formal education system; (2) expanding participation and access; and (3) enabling activities.
Fellowships in community pharmacy research: Experiences of five schools and colleges of pharmacy.
Snyder, Margie E; Frail, Caitlin K; Gernant, Stephanie A; Bacci, Jennifer L; Coley, Kim C; Colip, Lauren M; Ferreri, Stefanie P; Hagemeier, Nicholas E; McGivney, Melissa Somma; Rodis, Jennifer L; Smith, Megan G; Smith, Randall B
2016-01-01
To describe common facilitators, challenges, and lessons learned in 5 schools and colleges of pharmacy in establishing community pharmacy research fellowships. Five schools and colleges of pharmacy in the United States. Schools and colleges of pharmacy with existing community partnerships identified a need and ability to develop opportunities for pharmacists to engage in advanced research training. Community pharmacy fellowships, each structured as 2 years long and in combination with graduate coursework, have been established at the University of Pittsburgh, Purdue University, East Tennessee State University, University of North Carolina at Chapel Hill, and The Ohio State University. Program directors from each of the 5 community pharmacy research fellowships identified common themes pertaining to program structure, outcomes, and lessons learned to assist others planning similar programs. Common characteristics across the programs include length of training, prerequisites, graduate coursework, mentoring structure, and immersion into a pharmacist patient care practice. Common facilitators have been the existence of strong community pharmacy partnerships, creating a fellowship advisory team, and networking. A common challenge has been recruitment, with many programs experiencing at least one year without filling the fellowship position. All program graduates (n = 4) have been successful in securing pharmacy faculty positions. Five schools and colleges of pharmacy share similar experiences in implementing community pharmacy research fellowships. Early outcomes show promise for this training pathway in growing future pharmacist-scientists focused on community pharmacy practice. Copyright © 2016 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.
2010 Five-Year Plan: Assessment of Health and Environmental Impacts of Uranium Mining and Milling
The five-year plan is intended to compile all activities contributing to the identification and cleanup of legacy uranium milling and mining activities in the Grants Mining District in the State of New Mexico.
Gatherings as a retention strategy.
Stokes, Lillian Gatlin
2003-01-01
Retention has long been an issue for minority students enrolled in nursing programs. Indiana University put into place an initiative to enhance retention. The initiative is "Gatherings" which provide a means for maintaining contact and direct communication with minority/international students. Gatherings allow students at varied levels in the program to interact with each other and to share issues and concerns. Over a five-year period, the benefits of this initiative have been voiced by students. These students have strongly encouraged continuation of "gatherings". Plans are underway to start similar sessions for all students.
Sobelson, Robyn K.; Young, Andrea C.
2017-01-01
The Centers for Public Health Preparedness (CPHP) program was a five-year cooperative agreement funded by the Centers for Disease Control and Prevention (CDC). The program was initiated in 2004 to strengthen terrorism and emergency preparedness by linking academic expertise to state and local health agency needs. The purposes of the evaluation study were to identify the results achieved by the Centers and inform program planning for future programs. The evaluation was summative and retrospective in its design and focused on the aggregate outcomes of the CPHP program. The evaluation results indicated progress was achieved on program goals related to development of new training products, training members of the public health workforce, and expansion of partnerships between accredited schools of public health and state and local public health departments. Evaluation results, as well as methodological insights gleaned during the planning and conduct of the CPHP evaluation, were used to inform the design of the next iteration of the CPHP Program, the Preparedness and Emergency Response Learning Centers (PERLC). PMID:23380597
Selected Economic Translations on Czechoslovakia (9th in the Series).
1960-09-01
and Its Development in the Third Five-Year Plan.,. 1 Gas Production and the Tasks of the Third Five-Year Plan» *<, <,*••..«........ e...USE ONLY C7.ECH0 SLOVAKIA Coal Processing In Czechoslovakia, and Its Development in the Third Flve-Year^laiT [The following is a translation of...struction during the Third Five-Year Plari in the coal- processing sectors which in size and scope ;has never been matched by our country before. The
Program Planning: The Embryonic Stage.
ERIC Educational Resources Information Center
Stone, Gwen
The document examines a number of sex education programs and reviews some of the problems and issues educators encounter in planning and initiating sex education programs. Included is a discussion of population background of Polk County, Iowa and a presentation by school administrators of five reasons which favor the teaching of sex education: (1)…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-08-01
During the first half of fiscal year 1995, most activities at the Yucca Mountain Site Characterization Project were directed at implementing the Program Plan developed by the Office of Civilian Radioactive Waste Management. The Plan is designed to enable the Office to make measurable and significant progress toward key objectives over the next five years within the financial resources that can be realistically expected. Activities this period focused on the immediate goal of determining by 1998 whether Yucca Mountain, Nevada, is technically suitable as a possible site for a geologic repository for the permanent disposal of spent nuclear fuel andmore » high-level radioactive waste. Work on the Project advanced in several critical areas, including programmatic activities such as issuing the Program Plan, completing the first technical basis report to support the assessment of three 10 CFR 960 guidelines, developing the Notice of Intent for the Environmental Impact Statement, submitting the License Application Annotated Outline, and beginning a rebaselining effort to conform with the goals of the Program Plan. Scientific investigation and analysis of the site and design and construction activities to support the evaluation of the technical suitability of the site also advanced. Specific details relating to all Project activities and reports generated are presented in this report.« less
Assessing Changes in Job Behavior Due to Training: A Guide to the Participant Action Plan Approach.
ERIC Educational Resources Information Center
Office of Personnel Management, Washington, DC.
This guide provides a brief introduction to the Participant Action Plan Approach (PAPA) and a user's handbook. Part I outlines five steps of PAPA which determine how job behavior is changed by training course or program participation. Part II, the manual, is arranged by the five steps of the PAPA approach. Planning for PAPA discusses making…
Khan, L A
1996-01-01
Pakistan was the first developing country to be concerned about the population problem. The first family planning/population related efforts in Pakistan spawned from the nongovernmental sector in the form of the establishment of the Family Planning Association of Pakistan in 1953. The efforts of the association were then later acknowledged in the First Five-Year Public Sector Development Plan which made a lump sum provision of Rs. 5 million for population activities. The First Five-Year Plan (1955-60) recognized that measures should be taken to limit the size of the Pakistani family in order to reduce the incidence of malnutrition and overcrowding. There has never been an organized and consistent religious opposition to family planning in Pakistan. Islamic provisions in the constitution and diverse views of different groups of religious leaders do, however, pose an ongoing hidden political threat to the government which could be exploited through their street power in urban areas. The author notes that the governments in Pakistan will always be reluctant to aggressively promote family planning. Under these circumstances, the government must seek the cooperation of credible nongovernmental organizations which tend to operate through community-based volunteers who generally have more influence in persuading communities to accept a given point of view. Greater involvement of local community groups in a planned and meaningful way will broaden the base of program promoters and supporters across the country and will create a climate conducive to large-scale adoption of the small family norm as a way of life.
Marine Environmental Quality Assessment Program, Five-Year Plan (FY 1984-1988).
1984-10-01
effects of pollutants on marine commu- nities living in near normal conditions . The facility consists of cubic meter fiberglass tanks with continually...environmental assessment has already been acknowledged. What is not yet clear, however, is the degree of dependence of the assessment on local conditions . Recent...research indicates that, under sublethal stress, individual environments become conditioned over time and react uniquely to ship effluents, dredging
2014-10-01
the following elements: aluminum, chromium , cobalt, columbium, molybdenum, nickel , titanium, tungsten, or vanadium. Specialty metals were added... stainless steel , and some engine parts metals. Table 2 summarizes the six prime contractors’ planning activities for procuring specialty metals and the...periodic briefings. Titanium is forecast for the entire program schedule; five year forecasts are provided by aircraft. Stainless steel usage is not
ERIC Educational Resources Information Center
Ribble, Mike S.; Bailey, Gerald D.
2004-01-01
Over the last two years, it has become evident that a behavior pattern of misuse and abuse with respect to technology is beginning to emerge in society. This outbreak of technology misuse and abuse is documented in continual news coverage on TV, in newspapers and on the Internet--both inside and outside of schools. The endless list of misuse and…
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
Measuring the Success of a Summer Reading Program: A Five-Year Study
ERIC Educational Resources Information Center
Liljequist, Laura; Stone, Staci
2009-01-01
Students were surveyed about a first-year summer reading program (SRP) at Murray State University, a regional, comprehensive university, for five consecutive years. Data are presented on how well the program met five stated goals: (a) providing a common academic experience for incoming first-year students, (b) introducing students to intellectual…
Western European and NATO Navies, 1981.
1982-07-01
while the remainder will be disposed of. France The installation of the new fiench government in 1981 has created something of a hiatus in French...with those adopted or planned by the previous government . France was expected to develop a new five-year military equipment plan this year to follow... government decided to use the period 1982-83 to complete the 1976-81 plan and then develop a regular five-ycar plan for the period 1984-88. The 1982 and
Cant, Robyn P; Foster, Michele M
2011-11-01
To critically examine utilisation of the 13 allied health services provided through Medicare Chronic Disease Management program and related general practitioner (GP) care planning initiatives. Statistics generated from national billing data from July 2005 to June 2009 were extracted from Medicare data and compared by profession, State or Territory and population. Most services grew over 4 years although nationally consistent service levels were not found for any allied health provider profession. On referral from GPs, podiatry, physiotherapy and dietetics provided most services (82%) in 2008-09. Professions had unique patterns of referral instanced by age range and sex of clientele. Wide variation was apparent in per capita utilisation of allied health services by State or Territory; some with far less than average national use and others with high use. Annual number of GP Management Plans or Team Care Arrangements was low (mean: ≤22 per GP in 2008-09), indicating low use of care planning. Inequality of accessibility for patients was apparent. Five years into the program, a review of Medicare Allied Health CDM policy is warranted. Implications. Research and evaluation is needed to identify whether the program is meeting the needs of GPs, allied health providers and chronic disease patients.
Morton, Paula G
2005-01-01
Staff development educators can better control their workload and provide a more comprehensive employee education program when the organization adopts a formal five-step process that culminates in the publication of an annual employee education calendar. This article describes the five steps of organization-wide learning needs assessment, resource allocation, priority setting, documentation of the educational plan, and calendar development, including elements and timelines. The annual calendar reflects involvement of staff throughout the facility in the identification, planning, and delivery of education programs. Its publication enhances staff and supervisors' awareness of learning opportunities. Its longer-range perspective assists managers and employees to better plan to meet learning needs and improves participation in staff development activities.
"Safe motherhood", family planning and maternal mortality: an Indonesian case study.
Smyth, I
1994-06-01
This case study in Indonesia examined some assumptions about the outcome of family planning services. Safe Motherhood programs were flawed, because of the misplaced emphasis on family planning as a strategy to reduce maternal mortality. Family planning programs reduce the exposure to the risks of child-bearing, but they do not reduce the actual risks. Reproductive health should not be linked so tightly to demographic concerns and family planning. That cost saving occurs from family planning is insufficient to justify inattention to the needs of high quality obstetric care. Family planning should be viewed as just one component of a larger, comprehensive set of measures designed to assure the health of women at all stages in the life cycle: as citizens and workers, as mothers, and as adolescents. Interventions must begin before childbearing and include growth in economic, educational, and health opportunities. The aim of reducing maternal mortality by 50% by the year 2000 was included in Indonesia's five-year development plan: Repelita V. The example of Indonesia was important, because of its achievements in reducing poverty and increasing the standard of living of the population, and because of its large population size. Estimated maternal mortality in Indonesia was 450/100,000 live births in 1989, up from 390/100,000 in 1982. There was evidence from other studies that maternal mortality has increased. Criticism has been directed to the misplaced emphasis on family planning and the top-down delivery of professional services for ignoring local health-enhancing practices and the role of families, fathers, and communities as health providers. The realized cost effectiveness of family planning is an abstraction. Fertility has declined with an increase in family planning from 5.6 children to 3.0 children in 1990, but, for example, Bali has both high levels of contraception use and high maternal mortality. Integrated programs and the high risk approach have not been particularly successful.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the SNL/CA Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2005 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
Greenberg, Mark T.; Feinberg, Mark E.; Johnson, Lesley E.; Perkins, Daniel F.; Welsh, Janet A.; Spoth, Richard L.
2014-01-01
This study is a longitudinal investigation of the PROSPER partnership model designed to evaluate the level of sustainability funding by community prevention teams, including which factors impact teams’ generation of sustainable funding. Community teams were responsible for choosing, implementing with quality, and sustaining evidence-based programs (EBPs) intended to reduce substance misuse and promote positive youth and family development. Fourteen US rural communities and small towns were studied. Data were collected from PROSPER community team members (N=164) and Prevention Coordinators (N=10), over a 5-year period. Global and specific aspects of team functioning were assessed over 6 waves. Outcome measures were the total funds (cash and in-kind) raised to implement prevention programs. All 14 community teams were sustained for the first five years. However, there was substantial variability in the amount of funds raised and these differences were predicted by earlier and concurrent team functioning and by team sustainability planning. Given the sufficient infrastructure and ongoing technical assistance provided by the PROSPER partnership model, local sustainability of EBPs is achievable. PMID:24706195
Twenty-Five Year Site Plan FY2013 - FY2037
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, William H.
2012-07-12
Los Alamos National Laboratory (the Laboratory) is the nation's premier national security science laboratory. Its mission is to develop and apply science and technology to ensure the safety, security, and reliability of the United States (U.S.) nuclear stockpile; reduce the threat of weapons of mass destruction, proliferation, and terrorism; and solve national problems in defense, energy, and the environment. The fiscal year (FY) 2013-2037 Twenty-Five Year Site Plan (TYSP) is a vital component for planning to meet the National Nuclear Security Administration (NNSA) commitment to ensure the U.S. has a safe, secure, and reliable nuclear deterrent. The Laboratory also usesmore » the TYSP as an integrated planning tool to guide development of an efficient and responsive infrastructure that effectively supports the Laboratory's missions and workforce. Emphasizing the Laboratory's core capabilities, this TYSP reflects the Laboratory's role as a prominent contributor to NNSA missions through its programs and campaigns. The Laboratory is aligned with Nuclear Security Enterprise (NSE) modernization activities outlined in the NNSA Strategic Plan (May 2011) which include: (1) ensuring laboratory plutonium space effectively supports pit manufacturing and enterprise-wide special nuclear materials consolidation; (2) constructing the Chemistry and Metallurgy Research Replacement Nuclear Facility (CMRR-NF); (3) establishing shared user facilities to more cost effectively manage high-value, experimental, computational and production capabilities; and (4) modernizing enduring facilities while reducing the excess facility footprint. Th is TYSP is viewed by the Laboratory as a vital planning tool to develop an effi cient and responsive infrastructure. Long range facility and infrastructure development planning are critical to assure sustainment and modernization. Out-year re-investment is essential for sustaining existing facilities, and will be re-evaluated on an annual basis. At the same time, major modernization projects will require new line-item funding. This document is, in essence, a roadmap that defines a path forward for the Laboratory to modernize, streamline, consolidate, and sustain its infrastructure to meet its national security mission.« less
76 FR 33814 - Notice of Open Public Hearing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-09
... in Washington, DC on June 15, 2011, to address ``China's Five Year Plan, Indigenous Innovation and.... The hearing will examine China's 12th Five-Year Plan, its ``Indigenous Innovation'' and industrial... June 15, 2011, by mailing to the contact below. A portion of each panel will include a question and...
Volunteer water monitoring: A guide for state managers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-08-01
Contents: executive summary; volunteers in water monitoring; planning a volunteer monitoring program; implementing a volunteer monitoring program; providing credible information; costs and funding; and descriptions of five successful programs.
Proceedings of the 6th Annual Summer Conference: NASA/USRA University Advanced Design Program
NASA Technical Reports Server (NTRS)
1990-01-01
The NASA/USRA University Advanced Design Program is a unique program that brings together NASA engineers, students, and faculty from United States engineering schools by integrating current and future NASA space/aeronautics engineering design projects into the university curriculum. The Program was conceived in the fall of 1984 as a pilot project to foster engineering design education in the universities and to supplement NASA's in-house efforts in advanced planning for space and aeronautics design. Nine universities and five NASA centers participated in the first year of the pilot project. The study topics cover a broad range of potential space and aeronautics projects that could be undertaken during a 20 to 30 year period beginning with the deployment of the Space Station Freedom scheduled for the mid-1990s. Both manned and unmanned endeavors are embraced, and the systems approach to the design problem is emphasized.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The 2006 program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larsen, Barbara L.
The annual program report provides detailed information about all aspects of the Sandia National Laboratories, California (SNL/CA) Environmental Planning and Ecology Program for a given calendar year. It functions as supporting documentation to the SNL/CA Environmental Management System Program Manual. The program report describes the activities undertaken during the past year, and activities planned in future years to implement the Planning and Ecology Program, one of six programs that supports environmental management at SNL/CA.
ERIC Educational Resources Information Center
Rhode Island Office of Library and Information Services, 2008
2008-01-01
In preparation for its Five-Year Plan for the years 2008 through 2012, the Rhode Island Office of Library and Information Services has reviewed a variety of information resources, including studies, publications, surveys and stakeholder meetings, to assist in understanding the state, its people, its future and the potential role of libraries. This…
Rapid Prototyping of Application Specific Signal Processors Program
1992-10-09
EREQ Query optimizer generator from the University of Colorado. In the five year time frame , this trend toward convergence makes it a non- issue ...related issues . TI’s RASSP vision plans to leverage and support CALS as a baseline for addressing data formatting and handling. Previously stated CALS goals ...of the U.S. Gc;:zrnrenL Distibution Statement A. Approved for public release; distribution is unlimited. Prepared By: _-- Texas Instruments Integrated
Overview of the NASA automation and robotics research program
NASA Technical Reports Server (NTRS)
Holcomb, Lee; Larsen, Ron
1985-01-01
NASA studies over the last eight years have identified five opportunities for the application of automation and robotics technology: (1) satellite servicing; (2) system monitoring, control, sequencing and diagnosis; (3) space manufacturing; (4) space structure assembly; and (5) planetary rovers. The development of these opportunities entails two technology R&D thrusts: telerobotics and system autonomy; both encompass such concerns as operator interface, task planning and reasoning, control execution, sensing, and systems integration.
NASA Astrophysics Data System (ADS)
Xu, J.; Jin, G.; Tang, H.; Li, L.
2016-12-01
To assess the effectiveness of water pollution control measures taken in the Huaihe River Basin (HRB) in China, we analyzed the temporal and spatial distributions of ammonia nitrogen (NH3-N) in the river water from 1998 to 2014 (three Chinese Five-year Plan periods).Analysis of measured NH3-N concentrations from various monitoring stations using the STL (seasonal trend decomposition using loess) method and a modified log-linear model revealed that: (1) The rate of NH3-N concentration reduction over the whole period was 70% 81% in the main stream of Huaihe River, but reached 88% in two major tributaries - the Shaying River and Guo River. (2) The NH3-N concentrations decreased significantly particularly between the tenth Five-year Plan and eleventh Five-year Plan periods in the main stream. In comparison, significant NH3-N reduction occurred over all three Five-year Plan periods in the Shaying and Guo tributaries. The concentration in the first year of a Five-year Plan period tended to much higher than that in the last year of the same period, likely due to the difference in implementing the pollution control measures. (3) The NH3-N concentrations were higher in the spring (fertilization period) and winter (low discharge) than in the summer and autumn. (4) With the implementation of pollution control measures, the contribution rate of NH3-N in the two major tributaries from point sources has decreased from 74% 93% in earlier years to 3% 28% in later years. However, NH3-N input from non-point sources appeared to remain stable and largely depend on runoff. To further reduce the NH3-N concentration in the river, policies and control measures should focus on non-point sources.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
[Analysis and prospect of projects funded in discipline of microbiology (NSFC) from 2006 to 2010].
Liao, Hai; Wen, Mingzhang; Yang, Haihua
2011-01-01
The overview of projects funded by general programs,key programs and national science fund for distinguished young scholars in discipline of microbiology, National Natural Science Foundation of China (NSFC) from 2006 to 2010 was recommended. Some important characters such as the distribution of projects in different subjects, organizations, regions and research fields were analyzed. Some important research fields which should be supported in "The Twelfth Five-Year Plan" was also put forward. The goal of the paper is to provide information of funding in NSFC for researchers in the field of microbiology.
DSM for transmission and distribution deferral in Queensland, Australia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gishkariany, G.; Hoch, L.; King, M.
1995-12-01
The South East Queensland Electricity Board (SEQEB) is a distributor of electricity serving the greater Brisbane area. The service area is characterized by relatively high growth, which is creating pressure on the adequacy of transmission and distribution capacity in the area. The utility has embarked on two initial efforts to assess the ability of DSM to provide cost-effective deferral of these capital projects. In both cases, the timing of the need for new transmission and/or distribution capacity has made it imperative that the DSM programs selected for implementation be capable of penetrating the market and achieving results quickly. SEQEB`s Southmore » Gold Coast area is characterized by an affluent customer base with an increasing concern for the environment. In 1990, SEQEB undertook a Value Management Study, and produced an integrated supply-and demand-side plan for the area for the next ten years. The plan that was developed identified the potential for saving Australian $7 million (NPV) over five years through targeted DSM initiatives. To achieve these savings it was also determined that the DSM programs would have to reduce area peak demand by at least 2 MW per year for a period of ten years altogether. Three programs were implemented in the 1991-1992 program year, and achieved the targeted level of peak demand reduction. Results for the first half of the 1992-1993 program also look encouraging. In the utility`s Beaudesert Branch, the customer base is more rural, with significant numbers of farms, although one area is characterized by significant new suburban residential development. In this study, (which began in the second half of 1992), the planning methodology has been refined along the lines of that used in Pacific Gas and Electric`s Delta Project. Because the Beaudesert area contains only approximately 10,000 customers, it has proven important to undertake a significant amount of customer and end-use research in order to understand.« less
Nevada State Five-Year Plan: July 1, 2008 through June 30, 2013
ERIC Educational Resources Information Center
Nevada Department of Education, 2008
2008-01-01
With the recent enactment of the Carl D. Perkins Career and Technical Education Act of 2006, Congress has demonstrated overwhelming bipartisan support to continue the country's federal investment in career and technical education. This document, the "Nevada State Five-Year Plan for the Carl D. Perkins Act of 2006," referred hereinafter…
Wyoming State Library Five Year Plan, 1974-1978.
ERIC Educational Resources Information Center
Wyoming State Library, Cheyenne.
An overview is presented of the Wyoming State Library Five Year Plan. The first major component deals with demographic characteristics, giving data on the State's area, population, racial characteristics, and the location of minority groups. The second main component provides a brief review of the Wyoming State Library Advisory Council and the…
Prioritizing Arctic Observations with Limited Resources
NASA Astrophysics Data System (ADS)
Kelly, B.; Starkweather, S.
2012-12-01
U.S. Federal agencies recently completed a five-year research plan for the Arctic including plans to enhance efforts toward an Arctic Observing Network (AON). Following on numerous national and international planning efforts, the five-year plan identifies nine priority areas including enhancing observing system design, assessing priorities of local residents, and improving data access. AON progress to date has been realized through bottom-up funding decisions and some top-down design optimization approaches, which have resulted in valuable yet ad hoc progress towards Arctic research imperatives. We suggest that advancing AON beyond theoretical design and ad hoc efforts with the engagement of multiple U.S. Federal agencies will require a structured, input-based planning approach to prioritization that recognizes budget realities. Completing a long list of worthy observing efforts appears to be unsustainable and inadequate in responding to the rapid changes taking place in the Arctic. Society would be better served by more rapid implementation of sustained, long-term observations focused on those climate feedbacks with the greatest potential negative impacts. Several emerging theoretical frameworks have pointed to the need to enhance iterative, capacity-building dialog between observationalists, modelers, and stakeholders as a way to identify these broadest potential benefits. We concur and suggest that those dialogs need to be facilitated and sustained over long periods. Efforts to isolate observational programs from process research are, we believe, impeding progress. At the same time, we note that bottom-up funding decisions, while useful for prioritizing process research, are less appropriate to building observing systems.
KAMEDO report no. 82: explosion at the fireworks warehouse in the Netherlands in 2000.
Björnhagen, Viveka; Messner, Torbjörn; Brändström, Helge
2006-01-01
A fire and subsequent explosions occurred in a fireworks warehouse on 13 May 2000. A total of 947 persons were injured and 21 persons died, including four firefighters and one reporter. Communication networks became overloaded and impaired notification chains. The hospital disaster plan was followed, but was proved inadequate. Public information was a high priority. A counselling center was established early and was planned to continue operation for five years. The command function did not perform to expectations. Hospital triage was impaired as many responsible left the triage area. Short-term psychosocial support evolved to long-term programs. Liability issues were examined.
Miller, Ashley; Franzen-Castle, Lisa; Aguirre, Trina; Krehbiel, Michelle; Colby, Sarah; Kattelmann, Kendra; Olfert, Melissa D; Mathews, Douglas; White, Adrienne
2016-06-01
It is important to understand adult outcomes in childhood obesity prevention programs as parents and caregivers have a significant influence on the eating and physical activity habits of youth. Grounded in the social cognitive theory, the iCook 4-H study was centered on a dyad model (9-10 year-olds and their primary meal preparers) to teach healthy cooking skills, shopping and meal habits, and being active as a family. The program took place in five states and dyads (n = 54) were recruited through flyers, e-mails, and in-person contact. The focus of this article is to provide findings from adult program participants. Demographics and self-reported food intake, procurement, preparation and safety practices, feeding relationships, mealtime routines, and height and weight were collected through surveys at baseline and program completion, which spanned 3 months. Descriptive statistics including two-related samples tests and paired samples t tests were used to assess pre- and post-program survey data responses at p < 0.05 significance level. Most had a bachelor's degree (31%) or some college (29%), about half were white, 66% were married, about 30% of households participated in assistance programs, and 82% were female. At program conclusion, participants significantly improved meal planning, prioritizing healthy meal choices, shopping with a grocery list, and reading Nutrition Facts Labels. There were also significant, positive differences noted in cooking skill confidence (p = 0.015), desire to cook more meals at home, and fewer fast food meals. Adult-youth feeding interactions also significantly improved. There were also significant increases in fruit juice (100%), vegetable soup, and whole grain consumption. Based on results, adults reported improvements in meal planning, cooking, and purchasing skills that were taught in classes. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOT National Transportation Integrated Search
1978-08-01
A test plan for the accelerated life testing of thermally shielded tank cars is described. The test program would be conducted at the DOT Transportation Test Center in Pueblo, Colorado. Eighteen tank cars would be included in the program. Five cars w...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Cyrus M; Nanstad, Randy K; Clayton, Dwight A
2012-09-01
The Department of Energy s (DOE) Light Water Reactor Sustainability (LWRS) Program is a five year effort which works to develop the fundamental scientific basis to understand, predict, and measure changes in materials and systems, structure, and components as they age in environments associated with continued long-term operations of existing commercial nuclear power reactors. This year, the Materials Aging and Degradation (MAaD) Pathway of this program has placed emphasis on emerging Non-Destructive Evaluation (NDE) methods which support these objectives. DOE funded Research and Development (R&D) on emerging NDE techniques to support commercial nuclear reactor sustainability is expected to begin nextmore » year. This summer, the MAaD Pathway invited subject matter experts to participate in a series of workshops which developed the basis for the research plan of these DOE R&D NDE activities. This document presents the results of one of these workshops which are the DOE LWRS NDE R&D Roadmap for Reactor Pressure Vessels (RPV). These workshops made a substantial effort to coordinate the DOE NDE R&D with that already underway or planned by the Electric Power Research Institute (EPRI) and the Nuclear Regulatory Commission (NRC) through their representation at these workshops.« less
1987-03-01
Participants in the Seminar on Population Policies for Top-level Policy Makers and Program Managers, meeting in Thailand during January 1987, examined the challenges now facing them regarding the implementation of fertility regulation programs in their respective countries -- Bangladesh, China, India, Indonesia, Malaysia, Nepal, Pakistan, the Philippines, the Republic of Korea, and Thailand. This Seminar was organized to coincide with the completion of an Economic and Social Commission for Asia and the Pacific (ESCAP) study investigating the impact and efficiency of family planning programs in the region. Country studies were reviewed at the Seminar along with policy issues about the status of women, incentive and disincentive programs, and socioeconomic factors affecting fertility. In Bangladesh the government recognizes population growth as its top priority problem related to the socioeconomic development of the country and is working to promote a reorientation strategy from the previous clinic-oriented to a multidimensional family welfare program. China's family planning program seeks to postpone marraige, space the births of children between 3-5 years, and promote the 1-child family. Its goal is to reduce the rate of natural increase from 12/1000 in 1978 to 5/1000 by 1985 and 0 by 2000. India's 7th Five-Year-Plan (1986-90) calls for establishing a 2-child family norm by 2000. In Indonesia the government's population policy includes reducing the rate of population growth, achieving a redistribution of the population, adjusting economic factors, and creating prosperous families. The government of Indonesia reversed its policy to reduce the population growth rate in 1984 and announced its goal of achieving a population of 70 million by 2100 in order to support mass consumption industries. It has created an income tax deduction system favoring large families and maternity benefits for women who have up to 5 children as incentives. Nepal's official policy is to decrease fertility, control international migration, and modify the spatial distribution of the population. To reduce its population growth rate, Pakistan has adopted a multi-sectoral, multidimensional approach to family planning. The policy of the government of the Philippines is to bring the population growth rate in line with the availability of natural resources and employment opportunities. In its 5-year plan covering 1982-86, the government of the Republic of Korea emphasized social development, attempting to more fully integrate population and development policies and programs within relevant sectors. To reduce its population growth rate to 1.3% by 1992, the government of Thailand is expanding the reach of its family planning program.
ERIC Educational Resources Information Center
Daval, Nicola, Ed.
The first of two program sessions at this semiannual meeting addressed the agenda of the Association of Research Libraries (ARL) for the 1990s, and the report provides summaries of remarks by Elaine Sloan on the background; D. Kaye Gapen on a report from the Task Force on Review of the ARL Five-Year Plan; and Duane E. Webster on the ARL framework…
Comparison of provider and plan-based targeting strategies for disease management.
Annis, Ann M; Holtrop, Jodi Summers; Tao, Min; Chang, Hsiu-Ching; Luo, Zhehui
2015-05-01
We aimed to describe and contrast the targeting methods and engagement outcomes for health plan-delivered disease management with those of a provider-delivered care management program. Health plan epidemiologists partnered with university health services researchers to conduct a quasi-experimental, mixed-methods study of a 2-year pilot. We used semi-structured interviews to assess the characteristics of program-targeting strategies, and calculated target and engagement rates from clinical encounter data. Five physician organizations (POs) with 51 participating practices implemented care management. Health plan member lists were sent monthly to the practices to accept patients, and then the practices sent back data reports regarding targeting and engagement in care management. Among patients accepted by the POs, we compared those who were targeted and engaged by POs with those who met health plan targeting criteria. The health plan's targeting process combined claims algorithms and employer group preferences to identify candidates for disease management; on the other hand, several different factors influenced PO practices' targeting approaches, including clinical and personal knowledge of the patients, health assessment information, and availability of disease-relevant programs. Practices targeted a higher percentage of patients for care management than the health plan (38% vs 16%), where only 7% of these patients met the targeting criteria of both. Practices engaged a higher percentage of their targeted patients than the health plan (50% vs 13%). The health plan's claims-driven targeting approach and the clinically based strategies of practices both provide advantages; an optimal model may be to combine the strengths of each approach to maximize benefits in care management.
New Science Applications Within the U.S. National Tsunami Hazard Mitigation Program
NASA Astrophysics Data System (ADS)
Wilson, R. I.; Eble, M. C.; Forson, C. K.; Horrillo, J. J.; Nicolsky, D.
2017-12-01
The U.S. National Tsunami Hazard Mitigation Program (NTHMP) is a collaborative State and Federal program which supports consistent and cost effective tsunami preparedness and mitigation activities at a community level. The NTHMP is developing a new five-year Strategic Plan based on the 2017 Tsunami Warning, Education, and Research Act as well as recommendations the 2017 NTHMP External Review Panel. Many NTHMP activities are based on the best available scientific methods through the NTHMP Mapping and Modeling Subcommittee (MMS). The primary activities for the MMS member States are to characterize significant tsunami sources, numerically model those sources, and create tsunami inundation maps for evacuation planning. This work remains a focus for many unmapped coastlines. With the lessons learned from the 2004 Indian Ocean and 2011 Tohoku Japan tsunamis, where both immediate risks and long-term recovery issues where recognized, the NTHMP MMS is expanding efforts into other areas that address community resilience. Tsunami evacuation modeling based on both pedestrian and vehicular modes of transportation are being developed by NTHMP States. Products include tools for the public to create personal evacuation maps. New tsunami response planning tools are being developed for both maritime and coastal communities. Maritime planning includes tsunami current-hazard maps for in-harbor and offshore response activities. Multi-tiered tsunami evacuation plans are being developed in some states to address local- versus distant-source tsunamis, as well as real-time evacuation plans, or "playbooks," for distant-source tsunamis forecasted to be less than the worst-case flood event. Products to assist community mitigation and recovery are being developed at a State level. Harbor Improvement Reports, which evaluate the impacts of currents, sediment, and debris on harbor infrastructure, include direct mitigation activities for Local Hazard Mitigation Plans. Building code updates in the five Pacific states will include new sections on tsunami load analysis of structures, and require Tsunami Design Zones based on probabilistic analyses. Guidance for community recovery planning has also been initiated. These new projects are being piloted by some States and will help create guidance for other States in the future.
Mao, XianQiang; Zhou, Ji; Corsetti, Gabriel
2014-09-02
This study evaluates how well China's 11th and 12th Five-Year Plans have been implemented in terms of energy conservation and air pollution control and deconstructs the effects of the economic, energy, and environmental policies included in the Plans. A "counterfactual" comparative-scenario method is deployed, which assumes a business as usual scenario in which the changes in economic, energy, and environmental parameters are "frozen", and then reactivates them one by one, with the help of LEAP modeling. It is found that during the 11th Five-Year Plan period, the binding targets were basically achieved. Economic growth put a great strain upon the energy demand and the environment, but energy policy made a decisive contribution by promoting energy efficiency and structure. Environmental policy promoted the deployment of end-of-pipe treatment which led to the control of certain air pollutants but at the expense of an increase in energy use and in the emission of other pollutants. During the ongoing 12th Five-Year Plan period, energy policy's potential for efficiency improvement is shrinking, but economic policy is restraining economic growth thus making a positive contribution. Environmental policy attempts to enforce multipollutant reduction, but there is still insufficient focus on the cocontrol of different pollutants and CO2.
Planning and Preparation for CD-ROM Implementation: The Citadel Library.
ERIC Educational Resources Information Center
Maynard, J. Edmund
Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... (Five Year Program). The Annual Progress Report is available for review at: www.boem.gov/Five-Year-Program-Annual-Progress-Report/ . Information on the Five Year Program is available online at http://www... final on August 27, 2012, after the required 60-day congressional review period. Section 18(e) of the...
A Five-Level Articulated Program
ERIC Educational Resources Information Center
Cobin, Joan; And Others
1976-01-01
Working collaboratively, five community colleges and three universities designed a multiple entry and exit educational system that would meet the needs of both nurses and employers. The plan provides nursing education at five levels (from nurse's aide to master's degree) allowing continuous progression between levels. (Author/MS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department`s mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE`s new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department`s commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM`s efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE`s commitment to the culture change by involving the general public in its development.« less
India's population--what is being done?
Maloney, C
1986-01-01
Thus far, India's efforts to curtail population growth have consistently failed to meet official targets. The crude birthrate (per 1000 population per year) is highest in the belt of 6 Hindi-speaking states, which include Rajasthan (40), Madhya Pradesh (38.5), Uttar Pradesh (38.4), Bihar (37.2), and Haryana (35.9). The rates are slightly lower in the other large North Indian States. The rate is 33.6 for India as a whole according to 1983 data. 3 of the South Indian states have the lowest crude birthrates: Kamataka (28.7), Tamil Nadu (27.8), and Kerata (24.9). Each of India's successive Five Year Plans gave increasingly more emphasis to population control, but the key tactical features have stayed the same. Population control comes under the Ministry of Health and Family Welfare, with family planning services provided through the free health delivery system. The main strategy continues to be to persuade people on an individual basis to accept the small family norm by a wide range of advertising and educational efforts. As of 1986, the family planning establishment had grown to gigantic proportions, employing half a million people in the family planning and health services. The Five Year Plan initiated in July 1985 continues the same approach but with added features. "Green cards" are given to those who accept sterilization after 2 children, allowing them a wide range of benefits such as low interest housing loans, preference in getting housing plots and enterprise loans, and salary increases for government employees. Health workers and other government employees have quotas of persons to motivate for contraceptive acceptance. They receive a small monetary incentive, which they often give to the acceptors so they can maintain their quotas and keep their jobs. The 1986 Revised Strategy for Family Planning is essentially more of the same with family planning more integrated with the health delivery system. Foreign and international donor agencies frequently have placed contradictory pressures on the Indian government, according to their own ideological tendencies. The family planning program is essential despite its faults, which are: bypassing of the natural community; and excessive medicalization and linkage with the health delivery system. In India there is an increasing realization that the achievements of the rural development and family planning programs are marginal relative to the amount of resources committed to them. This is because of the bureaucratic, from-the-top-down bias in which the physical community is neglected.
Outreach: the western New York Hospital Library Services Program, 1985-1989.
Birkinbine, L A; Bertuca, C A
1991-01-01
The Hospital Library Services Program (HLSP) in western New York, during the period covered by its first five-year plan, 1984-1989, is recounted and described. This ongoing program is funded annually by a New York State grant and hospital participation fees. It is designed to support access to biomedical information for health care professionals through a grant program for hospitals with staffed libraries and a circuit program for hospitals without library staffing or without libraries. Hospitals participating in the grant program contribute funds and receive grants for collection development. Hospitals participating in the circuit program pay a participation fee and receive regularly scheduled, documented, circuit librarian visits; a collection development grant; and a grant for contract library services. The program contracts with the State University of New York at Buffalo's (UB) Health Sciences Library to provide computerized literature searches; interlibrary loan (ILL) of journal articles, books, and audiovisuals; and ILL referrals. PMID:1958912
ERIC Educational Resources Information Center
Shonrock, Diana D.
This report describes the planning, implementation, and evaluation of a coordinated staff development program to offer certified, non-degree credit to non-professional librarians from small public libraries. The program plan includes a course consisting of five 3-hour sessions covering the reference interview; interlibrary loan, government…
Short-range transit plan for the Phoenix urbanized area : fiscal years 1982-1986
DOT National Transportation Integrated Search
1981-07-21
Report presents the FY 1980-81 update of the Phoenix, Arizona, urbanized area Short Range Transit Plan. It describes a five-year plan to guide improvements of the public transportation sytem. Planning aspects of the report will be incorporated into t...
Continuing Education Unit: A Collection of Five Journal Articles, 1972.
ERIC Educational Resources Information Center
1972
Using the Georgia plan as his basis for meeting classification needs, Charles B. Lord categorizes programs into five broad areas in "A Classification System for Continuing Education Programs," Adult Leadership, April 1972, pp. 357-359. Paul J. Grogan's "The Concept of a Continuing Education Unit," Indiana State Board of Health Bulletin, May 1972,…
Happ, Mary Beth; Hoffman, Leslie A; Higgins, Linda W; Divirgilio, Dana; DiVirgilio, Dana; Orenstein, David M
2013-01-01
Despite recognized benefits, many children with cystic fibrosis (CF) do not consistently participate in physical activities. There is little empirical literature regarding the feelings and attitudes of children with CF toward exercise programs, parental roles in exercise, or factors influencing exercise experiences during research participation. The aim of this study is to describe the exercise experiences of children with CF and their parents during participation in a 6-month program of self-regulated, home-based exercise. This qualitative descriptive study was nested within a randomized controlled trial of a self-regulated, home-based exercise program and used serial semistructured interviews conducted individually at 2 and 6 months with 11 purposively selected children with CF and their parent(s). Six boys and five girls, ages 10-16 years, and parents(nine mothers, four fathers) participated in a total of 44 interviews. Five major thematic categories describing child and parent perceptions and experience of the bicycle exercise program were identified in the transcripts: (a) motivators, (b) barriers, (c) effort/work, (d) exercise routine, and (e) sustaining exercise. Research participation, parent-family participation, health benefits, and the child's personality traits were the primary motivators. Competing activities, priorities, and responsibilities were the major barriers in implementing the exercise program as prescribed. Motivation waned, and the novelty wore off for several (approximately half) parent-child dyads, who planned to decrease or stop the exercise program after the study ended. We identified motivators and barriers to a self-regulated, home-based exercise program for children with CF that can be addressed in planning future exercise interventions to maximize the health benefits for children with CF and the feasibility and acceptability to the children and their families.
The Department of Defense Human factors standardization program.
Chaikin, G
1984-09-01
The Department of Defense (DoD) Human Factors Standardization Program is the most far-reaching standardization programme in the USA. It is an integrated component of the overall DoD Standardization Program. While only ten major documents are contained in the human factors standardization area, their effects on human factors engineering programmes are profound and wide-ranging. Preparation and updating of the human engineering standardisation documents have grown out of the efforts of several military agencies, contractors, consultants, universities and individuals. New documents, engineering practice studies and revision efforts are continuously planned by the Tri-Service (Army, Navy, Air Force) Human Factors Standardization Steering Committee in collaboration with industry groups and technical societies. The present five-year plan and other standardisation documents are readily available for review and input by anyone with relevant interests. Human factors specialists and other readers of this journal may therefore influence the direction of the human factors standardisation programme and the content of its military specifications, standards and handbooks.
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
The Illinois Community College System has charted a course for the 21st century that responds to both the individual and community education needs. This plan, named Vision 2000, is the culmination of regional town meetings which clarified five educational goals. It offers liberal arts and sciences programs, occupational programs, developmental…
Personal Finance Education Guide for Planning Secondary School Programs. Second Edition.
ERIC Educational Resources Information Center
Oregon State Dept. of Education, Salem.
This guide has been developed to help teachers plan programs that meet both individual and common needs of all students in personal finance education. It defines the skills and knowledge necessary to function as an intelligent consumer in our complex and rapidly changing economic order. The guide has been developed around five basic concepts:…
Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.
ERIC Educational Resources Information Center
Haase, Patricia T.
Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…
Board of Governors' Recommendations: FY 2007-09 Biennial Capital Budget and Five-Year Plans
ERIC Educational Resources Information Center
Connecticut Department of Higher Education (NJ1), 2006
2006-01-01
In accordance with the Connecticut General Statutes Sec. 10a-6 and 10a-8, the Board of Governors' prepares and presents to the Governor and General Assembly a consolidated capital budget request and five-year plan with recommendations for public higher education. Through passage of the UConn 2000 legislation, the University of Connecticut…
ERIC Educational Resources Information Center
Van Horn, Carl; Fichtner, Aaron; Altman, Jennifer; Whittaker, Julie
This report contains the strategic vision for the Department of Labor (DOL)/Employment and Training Administration's research efforts for the next five years. Section I discusses the scope of the research plan and the development process. Section II is a review of literature concerning functioning of the labor market and identification of areas…
The relationship between treatment access and spending in a managed behavioral health organization.
Cuffel, B J; Regier, D
2001-07-01
This study replicated an earlier study that showed a linear relationship between level of treatment access and behavioral health spending. The study reported here examined whether this relationship varies by important characteristics of behavioral health plans. Access rates and total spending over a five- to seven-year period were computed for 30 behavioral health plans. Regression analysis was used to estimate the relationship between access and spending and to examine whether it varied with the characteristics of benefit plans. A linear relationship was found between level of treatment access and behavioral health spending. However, the relationship closely paralleled that found in the earlier study only for benefit plans with an employee assistance program linked to the managed behavioral health organization and for plans that do not allow the use of out-of-network providers. The results of this study replicate those of the earlier study in showing a linear relationship between access and spending, but they suggest that the magnitude of this relationship may vary according to key plan characteristics.
Five-Year Technology Plan. Educational Planning Center.
ERIC Educational Resources Information Center
Virginia Beach City Public Schools, VA.
This 5-year plan is based on "A Comprehensive Plan for Instructional and Administrative Use of Computers in the Virginia Beach Public Schools" ("The Pogrow Report," completed in December 1984) and the "Task Force Report on Information Systems" (completed in July 1988). These reports document the importance of making…
Use of family planning methods in Kassala, Eastern Sudan
2011-01-01
Background Investigating use and determinants of family planning methods may be instructive in the design of interventions to improve reproductive health services. Findings Across sectional community-based study was conducted during the period February-April 2010 to investigate the use of family planning in Kassala, eastern Sudan. Structured questionnaires were used to gather socio-demographic data and use of family planning. The mean ± SD of the age and parity of 613 enrolled women was 31.1 ± 7 years and 3.4 ± 1.9, respectively. Only 44.0% of these women had previously or currently used one or more of the family planning methods. Combined pills (46.7%) and progesterone injection (17.8%) were the predominant method used by the investigated women. While age, residence were not associated with the use of family planning, parity (> five), couple education (≥ secondary level) were significantly associated with the use of family planning. Husband objection and religious beliefs were the main reasons of non-use of family planning. Conclusion Education, encouragement of health education programs and involvement of the religious persons might promote family planning in eastern Sudan. PMID:21356106
Collins, Sara R; Rasmussen, Petra W; Doty, Michelle M; Garber, Tracy
2013-09-01
The Affordable Care Act's health insurance marketplaces are opening for enrollment on October 1, 2013. The Commonwealth Fund Health Insurance Marketplace Survey, 2013, finds that only two of five adults are aware of the marketplaces or of potential financial help that may be available to them to pay for plans purchased though the marketplaces. However, three of five adults who might be eligible for these new options said they were likely to take advantage of them. The survey also finds broad support for state expansion of the Medicaid program, even in states that have not yet decided to expand their programs. While outreach and education are critical to ensuring that those eligible for the new coverage options will enroll, the survey results suggest that eligible Americans will likely take advantage of the law's insurance reforms in the months and years to come.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dwight, Carla
The Department of Energy's Space and Defense Power Systems program provides a unique capability for supplying power systems that function in remote or hostile environments. This capability has been functioning since the early 1960s and counts the National Aeronautics and Space Administration as one of its most prominent customers. This enabling technology has assisted the exploration of our solar system including the planets Jupiter, Saturn, Mars, Neptune, and soon Pluto. This capability is one-of-kind in the world in terms of its experience (over five decades), breadth of power systems flown (over two dozen to date) and range of power levelsmore » (watts to hundreds of watts). This document describes the various components of that infrastructure, work scope, funding needs, and its strategic plans going forward.« less
Thermal management for high power space platform systems
NASA Technical Reports Server (NTRS)
Gualdoni, R. A.
1980-01-01
With future spacecraft power requirements expected to be in the order of 100 to 250 kilowatts and orbital lifetimes in the order of five to ten years, new approaches and concepts will be required that can efficiently and cost effectively provide the required heat rejection and temperature control capabilities. A plan was established to develop the commensurate technologies necessary for the thermal management of a high power space platform representative of future requirements and to achieve technology readiness by 1987. The approach taken in developing the program was to view the thermal requirements of the spacecraft as a spacecraft system rather than each as an isolated thermal problem. The program plan proposes 45 technology tasks required to achieve technology readiness. Of this total, 24 tasks were subsequently identified as being pacing technology tasks and were recommended for initiation in FY 1980 and FY 1981.
NASA Technical Reports Server (NTRS)
1984-01-01
The structure of the program, the five priority levels, the drive routines, the stepwise drive plan, the figure routines, meander X and y, the range of measurement table, the optimization of figure drive, the figure drive plan, dialogue routines, stack processing, the drive for the main terminal, the protocol routines, the drive for the microterminal, the drive for the experiment computer, and the main program are discussed.
Five Year Strategic Plan, 1993-1997, Lakeland Community College.
ERIC Educational Resources Information Center
Lakeland Community Coll., Mentor, OH.
In 1990, the newly formed Planning Advisory Committee at Lakewood Community College (LCC) in Mentor, Ohio, developed the college's first 5-year strategic plan with input from across the campus. This plan for 1993-97 updates the original 1990-95 plan and is designed to assist in the development of annual goals and objectives. Following an…
NASA/USRA University Advanced Design Program Fifth Annual Summer Conference
NASA Technical Reports Server (NTRS)
1989-01-01
The NASA/USRA University Advanced Design Program is a unique program that brings together NASA engineers, students, and faculty from United States engineering schools by integrating current and future NASA space/aeronautics engineering design projects into the university curriculum. The Program was conceived in the fall of 1984 as a pilot project to foster engineering design education in the universities and to supplement NASA's in-house efforts in advanced planning for space and aeronautics design. Nine universities and five NASA centers participated in the first year of the pilot project. Close cooperation between the NASA centers and the universities, the careful selection of design topics, and the enthusiasm of the students has resulted in a very successful program than now includes forty universities and eight NASA centers. The study topics cover a broad range of potential space and aeronautics projects.
A case-mix in-service education program.
Arons, R R
1985-01-01
The new case-mix in-service education program at the Presbyterian Hospital in the City of New York is a fine example of physicians and administration working together to achieve success under the new prospective pricing system. The hospital's office of Case-Mix Studies has developed an accurate computer-based information system with historical, clinical, and demographic data for patients discharged from the hospital over the past five years. Reports regarding the cases, diagnoses, finances, and characteristics are shared in meetings with the hospital administration and directors of sixteen clinical departments, their staff, attending physicians, and house officers in training. The informative case-mix reports provide revealing sociodemographic summaries and have proven to be an invaluable tool for planning, marketing, and program evaluation.
Drug Abuse Education Program. Drug Abuse Education, Grades 5,7,9. Bibliography Included.
ERIC Educational Resources Information Center
Baltimore City Public Schools, MD.
A drug abuse education program was implemented in grades five, seven, and nine in the Baltimore City Public Schools. Unit plans outline the curriculum content and learning activities for each of the three grades. The major objective in grade five is to familiarize pupils with various medically used drugs and to develop an understanding that they…
Code of Federal Regulations, 2010 CFR
2010-07-01
... years a benefit increase has been in effect, each complete 12-month period ending on or before the... 29 Labor 9 2010-07-01 2010-07-01 false Five-year phase-in of benefit guarantee for participants... PLANS Limitations on Guaranteed Benefits § 4022.25 Five-year phase-in of benefit guarantee for...
ERIC Educational Resources Information Center
Tennessee Univ., Knoxville.
THIS FIVE-PART BROCHURE CONTAINS THE TENNESSEE STATE PLAN FOR A COORDINATED STATEWIDE ADULT EDUCATION PROGRAM IMPLEMENTING TITLE I OF THE HIGHER EDUCATION ACT OF 1965. THE UNIVERSITY OF TENNESSEE WILL ADMINISTER THE PROGRAM UNDER ADVISEMENT OF A STATE COUNCIL REPRESENTING THE STATE BOARD OF EDUCATION, PRIVATE AND PUBLIC INSTITUTIONS OF HIGHER…
ERIC Educational Resources Information Center
Rice, Eric; And Others
This guidebook focuses on the third of five steps included in a planning system for improving local secondary and postsecondary program and facilities accessibility: generating strategies. The guidebook is comprised of four sections, each describing a specific technique for generating strategies. Techniques presented are (1) nominal group…
ERIC Educational Resources Information Center
Anderson, Nancy; And Others
This is one of a set of five handbooks compiled by the Northwest Regional Educational Laboratory that describes the processes for planning and operating a total experience-based career education (EBCE) program. Processes and material are those developed by the original EBCE model--Community Experience in Career Education (CE)2. The area of…
An overview of autonomous rendezvous and docking system technology development at General Dynamics
NASA Technical Reports Server (NTRS)
Kuenzel, Fred
1991-01-01
The Centaur avionics suite is undergoing a dramatic modernization for the commercial, DoD Atlas and Titan programs. The system has been upgraded to the current state-of-the-art in ring laser gyro inertial sensors and Mil-Std-1750A processor technology. The Cruise Missile avionic system has similarly been evolving for many years. Integration of GPS into both systems has been underway for over five years with a follow-on cruise missile system currently in flight test. Rendezvous and Docking related studies have been conducted for over five years in support of OMV, CTV, and Advanced Upper Stages, as well as several other internal IR&D's. The avionics system and AR&D simulator demonstrated to the SATWG in November 1990 has been upgraded considerably under two IR&D programs in 1991. The Centaur modern avionics system is being flown in block upgrades which started in July of 1990. The Inertial Navigation Unit will fly in November of 1991. The Cruise Missile avionics systems have been fully tested and operationally validated in combat. The integrated AR&D system for space vehicle applications has been under development and testing since 1990. A Joint NASA / GD ARD&L System Test Program is currently being planned to validate several aspects of system performance in three different NASA test facilities in 1992.
National Aeronautics and Space Administration Budget Estimates, Fiscal Year 2011
NASA Technical Reports Server (NTRS)
2010-01-01
The Budget includes three new robust exploration programs: (1) Technology demonstration program, $7.8 five years. Funds the development and demonstration of technologies that reduce the cost and expand the capabilities of future exploration activities, including in-orbit refueling and storage. (2) Heavy-Lift and Propulsion R&D, $3.1 billion over five years. Funds R&D for new launch systems, propellants, materials, and combustion processes. (3) Robotic precursor missions, $3.0 billion over five years. Funds cost-effective means to scout exploration targets and identify hazards and resources for human visitation and habitation. In addition, the Budget enhances the current Human Research Program by 42%; and supports the Participatory Exploration Program at 5 million per year for activities across many NASA programs.
Trend analysis of key solvency ratios for health plans in Medicaid managed care.
McCue, Michael J
2013-01-01
The focus of this article is to assess the solvency of health plans that manage Medicaid members across key plan traits, specifically Medicaid dominant or plans with more than 75 percent Medicaid members, and plans owned by publicly traded companies, and sponsored by health care providers. The study accessed National Association of Insurance Commissioners (NAIC) financial data and computed key solvency ratios for 117 Medicaid health plans over a five-year time trend from 2007 to 2011. A mean test compared the mean values for each year and for the entire study period on risk-based capital (RBC), cash-flow margin and debt to total capital ratios across these plan traits. For all years except 2008 Medicaid dominant plans had a lower RBC ratio for all four out of five years. Cash-flow margin ratio for Medicaid dominant plans was only lower in 2011 than non-Medicaid dominant plans. From 2007 to 2010, debt to total capital was higher for plans owned by publicly traded companies than non-publicly traded companies. Given the potential for an expanding Medicaid market, Medicaid health plans have reduced their risk of insolvency by increasing the RBC over time and reducing their debt capital. However between 2010 and 2011 cash-flow margin ratio decreased by almost 180 basis points for Medicaid dominant plans.
Nevada Test Site-Directed Research, Development, and Demonstration. FY2005 report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lewis, Will
2006-09-01
The Nevada Test Site-Directed Research, Development, and Demonstration (SDRD) program completed a very successful year of research and development activities in FY 2005. Fifty new projects were selected for funding this year, and five FY 2004 projects were brought to conclusion. The total funds expended by the SDRD program were $5.4 million, for an average per project cost of just under $100,000. Two external audits of SDRD accounting practices were conducted in FY 2005. Both audits found the program's accounting practices consistent with the requirements of DOE Order 413.2A, and one included the observation that the NTS contractor ''did anmore » exceptional job in planning and executing year-start activities.'' Highlights for the year included: the filing of 18 invention disclosures for intellectual property generated by FY 2005 projects; programmatic adoption of 17 FY 2004 SDRD-developed technologies; participation in the tri-lab Laboratory Directed Research and Development (LDRD) and SDRD program review that was broadly attended by NTS, NNSA, LDRD, and U.S. Department of Homeland Security representatives; peer reviews of all FY 2005 projects; and the successful completion of 55 R&D projects, as presented in this report.« less
BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and themore » nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.« less
The CNCC Five-Year Plan of Action, 1989-90 to 1993-94.
ERIC Educational Resources Information Center
Colorado Northwestern Community Coll., Rangely.
This six-part report describes the recently developed 5-year strategic plan of action for Colorado Northwestern Community College (CNCC), reviewing the mission and goals of the college, stating 21 organizational objectives in order of priority, and detailing implementation activities for each of the 5 years of the plan. Part I provides a brief…
ERIC Educational Resources Information Center
Information Dynamics Corp., Reading, MA.
A study intended to provide the Defense Documentation Center (DDC) with a five-year plan for the development of improved and new microfiche products, services, and production capabilities is summarized in this report. In addition, the major findings, conclusions, and recommendations developed during the study are noted. The results of the research…
Why does Bangladesh remain so poor? Part I: the situation and efforts to change it.
Maloney, C
1985-01-01
This 1st part of the discussion of the poverty in Bangladesh reviews efforts on the part of individuals, donor agencies, and the government to alleviate poverty, and some goals of the new Third Five Year Plan. More than 3/4 of the people of Bangladesh live in poverty or close to it, according to development and economic criteria. Bangladesh society has hardly any parallel in the world if viewed from the perspective of its capacity, like a biological species, to adapt to an ecological niche and then reproduce to fill that niche. This defines success in biological terms. The Bangladesh society that developed was highly in tune with the natural environment of the rice growing plains. Social organization, kinship, settlement pattern, economic transactions, beliefs systems, and reproductive biology all developed in close symbiosis with the land. From a humanitarian perspective, Bangladesh is also highly successful. The human interaction, the expressive culture, the fullness of life, and the verbal arts all are more fully expressed than in many cultures. By "development" criteria, Bangladesh appears highly unsuccessful. Per capita income is about $130 a year. Bangladesh ranks very low in such indices as literacy, housing, roads, health services, infant survival, loan recovery, exportable goods, and control of the population growth rate. There is no question but that individuals usually are well aware if their situation is precarious, and they take rational action to improve their security; the government and private agencies have a multitude of programs aimed at alleviating poverty. For Bangladesh as a whole, domestic savings in 1984-85 was 8%, and during the Second Five Year Plan the rate of domestic savings increased faster than was expected, compared with income. Almost all the nongovernmental organizations (NGOs), many bilateral donor agencies, and huge segments of government target their efforts to the poor and the small farmers. There are over 150 NGOs of substantial size in Bangladesh, besides many local ones. A 1985 survey of NGO programs to help the poor save and invest found that they have been successful generally in improving the economic condition of the target people. In comparison with the private agencies, government programs to reach small farmers and the poor tend not to work as well because they suffer from the pervasive malaise that affects almost all such attempts through the bureaucracy. Yet, the success they have achieved, as in raising agricultural productivity, accounts in significant measure for the economic stability of the country to date. The key goals of the country to date. The key goals of the Third Five Year Plan are: annual economic growth of 5.4%; reduction of annual population growth to 1.8%; and by the end of the plan raising at least 10% of the rural poor above the poverty line.
Designing Training Plans for Distributive Education. Final Report.
ERIC Educational Resources Information Center
Syhlman, William D.
These distributive education training and development plans for secondary-level programs provide lists of competencies a student needs to hold a job in sales and marketing occupational areas. The design of the training plans is based on a "pyramid" which incorporates the following five sections or levels of competencies (from general to…
Inorganic Analysis in Water Quality Control Programs. Instructor's Guide.
ERIC Educational Resources Information Center
Kroner, Audrey
This two-part instructor's guide was designed for a five-day course for chemists and technicians with little or no experience in inorganic analyses. Part I provides information on course planning and management including course description, staff responsibilities, suggested course plan and agenda, timeline for planning and conducting the course,…
ERIC Educational Resources Information Center
Hogg, Loretta A.
1980-01-01
Described is a science classroom program with centralized materials, and assistance and workshops for teachers. Classroom materials on one of five topics rotate every six weeks among five schools. Teachers plan specific units to match the arrival of the materials in their schools. (Author/DS)
Brief 76 Nuclear Engineering Enrollments and Degrees Survey, 2015 Data
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The 2015 Nuclear Engineering Enrollments and Degrees Survey reports degrees granted between September 1, 2014 and August 31, 2015. Enrollment information refers to the fall term 2015. The enrollments and degrees data comprises students majoring in nuclear engineering or in an option program equivalent to a major. Thirty-five academic programs reported having nuclear engineering programs during 2015, and data was received from all thirty-five programs. The report includes enrollment information on undergraduate students and graduate students and information by degree level for post-graduation plans.
Integrated Marketing Communications: A New Master's Degree Concept.
ERIC Educational Resources Information Center
Caywood, Clarke; Ewing, Raymond
1991-01-01
Describes how separate graduate degree programs have been fused into an integrated marketing communications program at Northwestern University. Discusses the five-quarter program that includes a core of new marketing communications planning and management classes, professional specialization classes in corporate public relations, advertising, and…
RMP Guidance for Chemical Distributors - Chapter 3: Five-Year Accident History
A five year accident history must be completed for each covered process, and all accidental release events meeting specified criteria must be reported in the Risk Management Plan (RMP) for that process.
Long Island Transportation Plan to Manage Congestion: Study Goals and Objectives
DOT National Transportation Integrated Search
2002-04-20
This three page document sets out five goals for the Long Island Transportation Plan Study and corresponding objectives. Those goals are (1) Create a framework to develop an integrated multi-modal transportation program for Long Island which coordina...
Focus Groups and Exit Interviews Are Components of Chemistry Department Program Assessment
NASA Astrophysics Data System (ADS)
Dreisbach, Joseph H.; Hogan, Thomas P.; Stamford, Anne Marie; Greggo, John W.
1998-10-01
The Chemistry Department, in conjunction with the Assessment and Institutional Research Office (AIRO) and the Department of Counseling and Human Services developed an assessment plan which incorporates use of focus groups and exit interviews. As part of the five-year departmental review, a number of student focus groups were facilitated to evaluate (a) the freshman and sophomore organic chemistry programs which also service other departments and (b) the upper division lecture and laboratory program for majors. Use of direct conversation in program assessment yields less ambiguous results compared with other methods because responses can be clarified with careful follow up questions. Success of this project gave rise to use of annual exit interviews with graduating seniors from the chemistry department. The approach described can easily be modified to meet the needs of any academic setting.
ERIC Educational Resources Information Center
Department of Commerce, Washington, DC.
The first of two volumes, this document describes the planning process of a 5-year plan for meeting the telecommunications and automatic data processing (ADP) needs of the federal government, examines the planning efforts of several typical agencies, and explores issues involved in managing new technology as it evolves. For each agency,…
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
Region 7 States Air Quality Monitoring Plans - Iowa
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Missouri
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Nebraska
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Region 7 States Air Quality Monitoring Plans - Kansas
National Ambient Air Quality Standard (NAAQS) - Iowa, Kansas, Missouri, and Nebraska; Annual Monitoring Network Plans, Five-Year Monitoring Network Assessments, and approval documentation. Each year, states are required to submit an annual monitoring netwo
Expansion of a Predoctoral Surgical Implant Selective for Dental Students.
Seitz, Stefanie D; Zimmermann, Richard L; Hendricson, William D
2016-03-01
Historically, predoctoral dental education programs have focused on the restoration of implants in the clinical environment; however, given the increase in dental implant therapy being performed by general dentists, the need to incorporate surgical implant training is becoming evident. This article describes a predoctoral surgical implant selective at the University of Texas Health Science Center at San Antonio and its evolution across five years to include emerging techniques and technology to enhance students' understanding of dental implant therapy, both surgical and restorative. From virtual implant planning and guided surgery to intra-oral scanning of implants for custom abutments and restorations, students obtained first-hand experiences with a wide spectrum of aspects of implant therapy. The results of anonymous surveys completed by 2014-15 students before and after the year-long selective regarding their impression of the program are also discussed.
1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less
A marketing plan for health care in the financial district of San Francisco.
Evans, S
1987-01-01
The development of a corporate health marketing program for the Medical Pavilion was based on three assumptions. 1. Medical Pavilion will contribute positively to health care cost containment for employers by providing convenient, quality medical care which will help to reduce employee time lost from work due to physician visits, and through health screening, early diagnosis, and out-patient procedures, decrease unnecessary hospitalization. 2. The level of awareness among chief executive officers, benefits directors, corporate medical directors, and employees will be positively related to utilization of health services at the Medical Pavilion. 3. The Medical Pavilion will be organized on a private practice model; although special programs related to employer coverage and specific benefits may be considered separately. The recommended goals of the corporate health program of the Medical Pavilion were as follows: 1. To develop demographic profiles based on current utilization of medical services in a random sample to corporations in the Financial District. 2. To design a survey of corporate leadership to determine a needs assessment strategy for the development of preventive health services programs to be offered at the Medical Pavilion. 3. To select an advertising and public relations agency; and determine the marketing bridges, for the first year and the following five year period. 4. To evaluate effectiveness of the corporate health marketing plan referral data collected through the Management Information System to be established at the Medical Pavilion.
Thomas, Heather Mc; Irwin, Jennifer D
2011-11-15
In Canada, there are limited occasions for youth, and especially at-risk youth, to participate in cooking programs. The paucity of these programs creates an opportunity for youth-focused cooking programs to be developed, implemented, and evaluated with the goal of providing invaluable life skills and food literacy to this potentially vulnerable group. Thus, an 18-month community-based cooking program for at-risk youth was planned and implemented to improve the development and progression of cooking skills and food literacy. This paper provides an overview of the rationale for and implementation of a cooking skills intervention for at-risk youth. The manuscript provides information about the process of planning and implementing the intervention as well as the evaluation plan. Results of the intervention will be presented elsewhere. Objectives of the intervention included the provision of applied food literacy and cooking skills education taught by local chefs and a Registered Dietitian, and augmented with fieldtrips to community farms to foster an appreciation and understanding of food, from 'gate to plate'. Eight at-risk youth (five girls and three boys, mean age = 14.6) completed the intervention as of November 2010. Pre-test cooking skills assessments were completed for all participants and post-test cooking skills assessments were completed for five of eight participants. Post intervention, five of eight participants completed in-depth interviews about their experience. The Cook It Up! program can provide an effective template for other agencies and researchers to utilize for enhancing existing programs or to create new applied cooking programs for relevant vulnerable populations. There is also a continued need for applied research in this area to reverse the erosion of cooking skills in Canadian society.
2011-01-01
Background In Canada, there are limited occasions for youth, and especially at-risk youth, to participate in cooking programs. The paucity of these programs creates an opportunity for youth-focused cooking programs to be developed, implemented, and evaluated with the goal of providing invaluable life skills and food literacy to this potentially vulnerable group. Thus, an 18-month community-based cooking program for at-risk youth was planned and implemented to improve the development and progression of cooking skills and food literacy. Findings This paper provides an overview of the rationale for and implementation of a cooking skills intervention for at-risk youth. The manuscript provides information about the process of planning and implementing the intervention as well as the evaluation plan. Results of the intervention will be presented elsewhere. Objectives of the intervention included the provision of applied food literacy and cooking skills education taught by local chefs and a Registered Dietitian, and augmented with fieldtrips to community farms to foster an appreciation and understanding of food, from 'gate to plate'. Eight at-risk youth (five girls and three boys, mean age = 14.6) completed the intervention as of November 2010. Pre-test cooking skills assessments were completed for all participants and post-test cooking skills assessments were completed for five of eight participants. Post intervention, five of eight participants completed in-depth interviews about their experience. Discussion The Cook It Up! program can provide an effective template for other agencies and researchers to utilize for enhancing existing programs or to create new applied cooking programs for relevant vulnerable populations. There is also a continued need for applied research in this area to reverse the erosion of cooking skills in Canadian society. PMID:22085523
Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana.
Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S-N; Kirby, Ryan
2016-02-01
Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders.
Influences on Adaptive Planning to Reduce Flood Risks among Parishes in South Louisiana
Paille, Mary; Reams, Margaret; Argote, Jennifer; Lam, Nina S.-N.; Kirby, Ryan
2016-01-01
Residents of south Louisiana face a range of increasing, climate-related flood exposure risks that could be reduced through local floodplain management and hazard mitigation planning. A major incentive for community planning to reduce exposure to flood risks is offered by the Community Rating System (CRS) of the National Flood Insurance Program (NFIP). The NFIP encourages local collective action by offering reduced flood insurance premiums for individual policy holders of communities where suggested risk-reducing measures have been implemented. This preliminary analysis examines the extent to which parishes (counties) in southern Louisiana have implemented the suggested policy actions and identifies key factors that account for variation in the implementation of the measures. More measures implemented results in higher CRS scores. Potential influences on scores include socioeconomic attributes of residents, government capacity, average elevation and past flood events. The results of multiple regression analysis indicate that higher CRS scores are associated most closely with higher median housing values. Furthermore, higher scores are found in parishes with more local municipalities that participate in the CRS program. The number of floods in the last five years and the revenue base of the parish does not appear to influence CRS scores. The results shed light on the conditions under which local adaptive planning to mitigate increasing flood risks is more likely to be implemented and offer insights for program administrators, researchers and community stakeholders. PMID:27330828
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Tank waste remediation system multi-year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsectionmore » for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.« less
Five Levels of Curriculum Integration Defined, Refined, and Described.
ERIC Educational Resources Information Center
Schumacher, Donna H.
1995-01-01
Provides a description of five levels of curriculum integration at the middle level, specifically: departmentalization, reinforcement, complementary or shared units, webbed, and integrated themes. Discusses curriculum integration in relation to preservice and inservice programs, common planning time, team composition, time issues, and…
Positioning the Co-op Program for Maximum Marketing Effectiveness.
ERIC Educational Resources Information Center
Harris, Ronald R.
1983-01-01
Examines the concept of positioning, which is the way that individuals perceive and are made aware of a program and believe in its benefit to them and its application to cooperative education programs. Includes a five-step plan for assessing the position of cooperative programs and six ways to implement a positioning strategy. (JOW)
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress
2016-09-21
some observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the...An October 2015 Congressional Budget Office (CBO) report on the Navy’s FY2015 30-year shipbuilding plan estimates that the plan would require 11.5...shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and its 30-year (FY2017-FY2046) shipbuilding plan include the following: the
Enterprise Resource Planning Implementation in Higher Education
ERIC Educational Resources Information Center
Graham, James F.
2009-01-01
Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…
Memphis State University's New Five-year Program For the Initial Preparation of Teachers.
ERIC Educational Resources Information Center
Saunders, Robert L.
A description is presented of a new extended teacher education program at Memphis State University. Instituted in 1985, the program has four objectives: (1) to develop and implement an extended (five-year) program covering all areas of teacher preparation, with institutional recommendation for certification coming only after completion of the…
Looking at graduates of Title V MCHB-funded training programs through the lens of the MCH pyramid.
Margolis, Lewis H; Rosenberg, Angela; Umble, Karl; Chewning, Linda
2013-10-01
To examine the distribution of professional responsibilities as reflected in each level of the MCH Pyramid for 208 graduates of five Maternal and Child Health Bureau (MCHB)-funded training programs-Leadership Education in Neurodevelopmental and Related Disabilities, nutrition, pediatric dentistry, public health, and social work-at the University of North Carolina at Chapel Hill. Graduates completed a web-based survey, 1-8 years after graduation. For each program, we constructed means of the reported percentages of total work time spent in infrastructure-building, population-based, enabling, and direct health care services. Although generally consistent with the goals of the training programs, the percentages of time spent in each level of the Pyramid varied substantially among the five programs. For example, for a clinically focused program like pediatric dentistry, 80.2 % of time is spent in direct care services in contrast to 14.8 % for public health graduates. For each program, however, graduates report responsibilities among the different levels of the Pyramid. Reporting job responsibilities within the MCH Pyramid provides a more informative picture of the contributions of training program graduates than do conventional metrics such as institutional or agency appointments. The fact that graduates from all five programs engage multiple roles is consistent with the MCHB workforce training goal to develop leaders in the field of MCH. Given the central role of the MCH Pyramid in planning and reporting for the MCH Services Block Grant, MCH training programs should include metrics such as graduates' roles according to the MCH Pyramid to assure that training goals are more closely aligned with workforce needs.
76 FR 17419 - Federal Health IT Strategic Plan: 2011-2015 Open Comment Period
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... consultation with other appropriate Federal agencies and in collaboration with private and public entities. Work on the five-year Plan began more than a year ago and has included collaboration across federal...
ERIC Educational Resources Information Center
Nieves-Squires, Sarah; Goodrich, Robert L.
This report is one of five submitted as products of a "Study Designed to Assist Planning of Research on Significant Instructional Features in Bilingual Education Programs." The reports are intended to assist the National Institute of Education (NIE) in its plans for a major new research study in bilingual education. The present volume is…
Simulation Activity for Initiating Thinking about Year Around School Plans.
ERIC Educational Resources Information Center
Sagness, Richard L.
This document presents a three-step model for providing teachers with basic information on year-round or extended school plans. As a first step, descriptions of basic plans are given. The four used in this paper are Staggered Quarter for All, Full 48-week School Year for All, Voluntary Summer Program, and A Summer Program for Professional…
NASA Year 2000 (Y2K) Program Plan
NASA Technical Reports Server (NTRS)
1998-01-01
NASA initiated the Year 2000 (Y2K) program in August 1996 to address the challenges imposed on Agency software, hardware, and firmware systems by the new millennium. The Agency program is centrally managed by the NASA Chief Information Officer, with decentralized execution of program requirements at each of the nine NASA Centers, Headquarters and the Jet Propulsion Laboratory. The purpose of this Program Plan is to establish Program objectives and performance goals; identify Program requirements; describe the management structure; and detail Program resources, schedules, and controls. Project plans are established for each NASA Center, Headquarters, and the Jet Propulsion Laboratory.
The Joint Aerosol-Monsoon Experiment (JAMEX): A Core Element for the Asian Monsoon Year (2008-2009)
NASA Technical Reports Server (NTRS)
Lau, WIlliam K. M.
2007-01-01
The objective of the Joint Aerosol-Monsoon Experiment (JAMEX) is to unravel the physical mechanisms and multi-scale interactions associated with aerosol-monsoon water cycle in the Asian Indo-Paczj?c region towards improved prediction of rainfall in land regions of the Asian monsoon. JAMEX will be planned as a five-year (2007-201 1) multi-national aerosol-monsoon research project, aimed at promoting collaboration, partnership and alignment of ongoing and planned national and international programs. Two coordinated special observing periods (SOP), covering the pre-monsoon (April-May) and the monsoon (June-August) periods is tentatively targeted for 2008 and 2009. The major work on validation and reference site coordination will take place in 2007 through the spring of 2008. A major science workshop is planned after SOP-I1 in 2010. Modeling and satellite data utilization studies will continue throughout the entire period to help in design of the observation arrays and measurement platforms for SOPS. The tentative time schedule, including milestones and research activities is shown in Fig. 1. One of the unique aspects of JAMEX is that it stems from grass-root scientific and societal imperatives, and it bridges a gap in existing national and international research programs. Currently we have identified 10 major national and international projects/programs separately for aerosols and monsoon research planned in the next five years in China, India, Japan, Italy, and the US, that could be potential contributors or partners with JAMEX. These include the Asian-Indo- Pacific Ocean (AIPO) Project and Aerosol Research Project from China, Monsoon Asian Hydro- Atmospheric Science Research and predication Initiative (MAHASRI) from Japan, Continental Tropical Convergence Zone (CTCZ) and Severe Thunderstorm: Observations and Regional Modeling (STORM) from India, Share-Asia from Italy, Atmospheric Brown Cloud (ABC), Pacific Aerosol-Cloud-Dust Experiment (PACDEX), East Asia Study of Tropospheric Aerosol: an International Regional Experiment (East-AIRE), and Radiation Aerosol Joint Observations - Monsoon Experiments over the Gangetic Himalayas Area (Rajo-Megha: dust cloud in Sanskrit) from the US, and Monsoon Asia Integrated Regional Study (MAIR) under the Earth Systems Science Partnership (ESSP) and WCRP. For JAMEX to succeed, it is crucial for an international body, such as CEOP or an organization under WCRP to provide the science oversight, data policy and stewardship, and to promote collaboration and partnership among national programs. It makes eminent sense for WCRP to expand the concept and the prototype proposed by JAMEX to include all monsoon countries to expand AMY08-09 into an International Monsoon Era (2008- 2013). Such an establishment followed by establishment of an international body for science oversight, and data stewardship will go a long way in promoting coordination and connection among various existing monsoon research programs within WCRP, and with burgeoning national programs on monsoon and aerosol research.
The Joint Aerosol-Monsoon Experiment (JAMEX): A Core Element for the Asian Monsoon Year (2008-2009)
NASA Technical Reports Server (NTRS)
Lau, William K.M.
2007-01-01
The objective of the Joint Aerosol-Monsoon Experiment (JAMEX) is to unravel the physical mechanisms and multi-scale interactions associated with aerosol-monsoon water cycle in the Asian Indo-Pacific region towards improved prediction of rainfall in land regions of the Asian monsoon. JAMEX will be planned as a five-year (2007-201 1) multi-national aerosol-monsoon research project, aimed at promoting collaboration, partnership and alignment of ongoing and planned national and international programs. Two coordinated special observing periods (SOP), covering the pre-monsoon (April-May) and the monsoon (June-August) periods is tentatively targeted for 2008 and 2009. The major work on validation and reference site coordination will take place in 2007 through the spring of 2008. A major science workshop is planned after SOP-I1 in 2010. Modeling and satellite data utilization studies will continue throughout the entire period to help in design of the observation arrays and measurement platforms for SOPS. The tentative time schedule, including milestones and research activities is shown in Fig. 1. One of the unique aspects of JAMEX is that it stems from grass-root scientific and societal imperatives, and it bridges a gap in existing national and international research programs. Currently we have identified 10 major national and international projects/programs separately for aerosols and monsoon research planned in the next five years in China, India, Japan, Italy, and the US, that could be potential contributors or partners with JAMEX. These include the Asian-Indo- Pacific Ocean (AIPO) Project and Aerosol Research Project from China, Monsoon Asian Hydro- Atmospheric Science Research and predication Initiative (MAHASRI) from Japan, Continental Tropical Convergence Zone (CTCZ) and Severe Thunderstorm: Observations and Regional Modeling (STORM) from India, Share-Asia from Italy, Atmospheric Brown Cloud (ABC), Pacific Aerosol-Cloud-Dust Experiment (PACDEX), East Asia Study of Tropospheric Aerosol: an International Regional Experiment (East-AIRE), and Radiation Aerosol Joint Observations - Monsoon Experiments over the Gangetic Himalayas Area (Rajo-Megha: dust cloud in Sanskrit) from the US, and Monsoon Asia Integrated Regional Study (MAIR) under the Earth Systems I Science Partnership (ESSP) and WCRP. For JAMEX to succeed, it is crucial for an international body, such as CEOP or an organization under WCRP to provide the science oversight, data policy and stewardship, and to promote collaboration and partnership among national programs. It makes eminent sense for WCRP to expand the concept and the prototype proposed by JAMEX to include all monsoon countries to expand AMY08-09 into an International Monsoon Era (2008- 2013). Such an establishment followed by establishment of an international body for science oversight, and data stewardship will go a long way in promoting coordination and connection among various existing monsoon research programs within WCRP, and with burgeoning national programs on monsoon and aerosol research.
24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).
Code of Federal Regulations, 2012 CFR
2012-04-01
... modifications required to make the comprehensive plan approvable. The PHA must re-submit the comprehensive plan... writing containing any false, fictitious or fraudulent statement or entry, in any matter within the...
24 CFR 968.320 - HUD review and approval of comprehensive plan (including five-year action plan).
Code of Federal Regulations, 2011 CFR
2011-04-01
... modifications required to make the comprehensive plan approvable. The PHA must re-submit the comprehensive plan... writing containing any false, fictitious or fraudulent statement or entry, in any matter within the...
Advocating change in Palestine. Advocacy for reproductive health: Palestine.
Wolmuth, P
1996-01-01
The Palestinian Family Planning and Protection Association (PFPPA) recently implemented a new strategic plan based on the Strategic Plan of the International Planned Parenthood Federation (IPPF) aimed at the empowerment of women. Advocacy is the central part of the program with preparing the services and dealing with the issue of population. In early 1995 a round of meetings in the West Bank and the Gaza Strip launched the plan with new programs for women, youth, men, information, education, and communication, and service provision to start in January 1996. In Gaza the Youth Program is well under way. Five members were selected from each of 50 groups for a 1-week training course in Gaza City in November 1995. The topics included: mutual respect between husband and wife, discussion of the role of family planning in the context of Islam, the rights and wrongs of polygamy, and the hotly debated issue of sex segregation in education. The PFPPA staff was initially apprehensive about the new youth and women's program plans to broaden family planning to women's empowerment and sexual and reproductive health. An IPPF-sponsored video was also shown in Hebron, West Bank, on the problem of early marriage. It featured Palestinian women: one with 12 children who was married at age 13; a mother whose husband wanted to marry off their 12-year-old daughter; and portrayed pressure from husbands and other family members to produce many children. The new strategy engendered debate in the West Bank and Gaza among village women and young people, while in the meantime the training of government health workers started in sexual and reproductive health counseling. In the village of Tkooi, near Bethlehem, a counselor held sessions on the oppression of women and psycho-physiological problems and stress. A lawyer also summarized women's economic and property rights, which most of them were unaware of.
A study on the utilization of advanced composites in commercial aircraft wing structure
NASA Technical Reports Server (NTRS)
Watts, D. J.
1978-01-01
A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.
Utah's Transition Guidelines for Students at Risk and Students with Mild/Moderate Handicaps.
ERIC Educational Resources Information Center
Utah State Board of Education, Salt Lake City.
These transition guidelines are designed to give Utah school districts direction in planning transition programs for Utah students at risk and/or students with disabilities. The guidelines present best practices in planning to assist these special needs students from school to life in their communities. The five-step process includes planning,…
ERIC Educational Resources Information Center
Center for Research in Educational Accountability and Teacher Evaluation (CREATE), Kalamazoo, MI.
The Cross-cutting Evaluation Theory Planning Seminar was initiated to provide insight that will assist in development of a planning proposal for the Cross-cutting Theory Project of the Center for Research on Educational Accountability and Teacher Evaluation (CREATE). CREATE consists of five separate programs, four of which address specific topics…
Science Facilities Design Guidelines.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
These guidelines, presented in five chapters, propose a framework to support the planning, designing, constructing, and renovating of school science facilities. Some program issues to be considered in the articulation of a science program include environmental concerns, interdisciplinary approaches, space flexibility, and electronic…
RMP Guidance for Warehouses - Chapter 3: Five-Year Accident History
A five year accident history must be completed for each covered process, and all accidental releases meeting specified criteria must be reported in the Risk Management Plan (RMP). Must include details about each event and its impacts.
Vocational Agriculture I Basic Core. Section C--Supervised Experience Programs.
ERIC Educational Resources Information Center
Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.
This curriculum guide contains five units teaching preservice vocational teachers to conduct supervised experience programs. Each unit contains an objective (e.g., "After completing this unit, the student should be able to choose and plan supervised occupational experience programs"); specific objectives (e.g., "State reasons for…
TEACHER TRAINING AND THE CLASSICS.
ERIC Educational Resources Information Center
REXINE, JOHN E.
WITH THE STUDY OF MODERN FOREIGN LANGUAGES FAR OUTSTRIPPING THE STUDY OF LATIN, IT BEHOOVES LATIN TEACHERS TO REVITALIZE THEIR TEACHER EDUCATION PROGRAMS. MORE SPECIFICALLY, NEW PROGRAMS SHOULD REFLECT THE IDEAS AND RECOMMENDATIONS OF JAMES B. CONANT, THE PLANS OF FIVE EXPLORATORY PROGRAMS IN TEACHER PREPARATION INITIATED BY THE N.Y. STATE…
Prevalence of Evaluation Method Courses in Education Leader Doctoral Preparation
ERIC Educational Resources Information Center
Shepperson, Tara L.
2013-01-01
This exploratory study investigated the prevalence of single evaluation methods courses in doctoral education leadership programs. Analysis of websites of 132 leading U.S. university programs found 62 evaluation methods courses in 54 programs. Content analysis of 49 course catalog descriptions resulted in five categories: survey, planning and…
Choudhry, Niteesh K; Fischer, Michael A; Smith, Benjamin F; Brill, Gregory; Girdish, Charmaine; Matlin, Olga S; Brennan, Troyen A; Avorn, Jerry; Shrank, William H
2014-03-01
Value-based insurance design (VBID) plans selectively lower cost sharing to increase medication adherence. Existing plans have been structured in a variety of ways, and these variations could influence the effectiveness of VBID plans. We evaluated seventy-six plans introduced by a large pharmacy benefit manager during 2007-10. We found that after we adjusted for the other features and baseline trends, VBID plans that were more generous, targeted high-risk patients, offered wellness programs, did not offer disease management programs, and made the benefit available only for medication ordered by mail had a significantly greater impact on adherence than plans without these features. The effects were as large as 4-5 percentage points. These findings can provide guidance for the structure of future VBID plans.
The components of action planning and their associations with behavior and health outcomes.
Lorig, Kate; Laurent, Diana D; Plant, Kathryn; Krishnan, Eswar; Ritter, Philip L
2014-03-01
Based on the works of Kiesler and Bandura, action plans have become important tools in patient self-management programs. One such program, shown effective in randomized trials, is the Internet Chronic Disease Self-Management Program. An implementation of this program, Healthy Living Canada, included detailed information on action plans and health-related outcome measures. Action plans were coded by type, and associations between action plans, confidence in completion and completion were examined. Numbers of Action Plans attempted and competed and completion rates were calculated for participants and compared to six-month changes in outcomes using regression models. Five of seven outcome measures significantly improved at six-months. A total of 1136 action plans were posted by 254 participants in 12 workshops (mean 3.9 out of 5 possible); 59% of action plans involved exercise, 16% food, and 14% role management. Confidence of completion was associated with completion. Action plan completion measures were associated with improvements in activity limitation, aerobic exercise, and self-efficacy. Baseline self-efficacy was associated with at least partial completion of action plans. Action planning appears to be an important component of self-management interventions, with successful completion associated with improved health and self-efficacy outcomes.
NASA Technical Reports Server (NTRS)
Gardner, J. E.
1983-01-01
Accomplishments of the past year and plans for the coming year are highlighted as they relate to five year plans and the objectives of the following technical areas: aerothermal loads; multidisciplinary analysis and optimization; unsteady aerodynamics; and configuration aeroelasticity. Areas of interest include thermal protection system concepts, active control, nonlinear aeroelastic analysis, aircraft aeroelasticity, and rotorcraft aeroelasticity and vibrations.
24 CFR 943.128 - How does a consortium carry out planning and reporting functions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY CONSORTIA AND JOINT VENTURES... the consortium agreement, the consortium must submit joint five-year Plans and joint Annual Plans for... the joint PHA Plan. ...
Recent trends in fertility in Botswana.
Diamond, I; Rutenberg, N
1995-01-01
The argument is made that fertility decline in rural Botswana during the 1980s could be a response to the extremely harsh economic conditions resulting from the sustained drought. The drought may have contributed to greater separation of spouses and increased the openness of the population to integrated maternal and child health (MCH) and family planning programs. Migration to urban areas was accompanied by housing shortages, which occurred because of a moratorium on construction to conserve water and crowding that could have reduced urban fertility. Supplementary feeding programs for children aged under five years were only available at MCH centers. The impact of the drought on men's resources may have reduced available resources for paying "bogadi" and thus delayed childbearing and marriage. Agricultural relief programs may have contributed to men's longer stays on arable land and thus delayed marriage. Women in female headed households, which are large in number in Botswana, and unmarried women may have chosen to adopt contraception due to limited resources for supporting children. Period declines in fertility are described. The total fertility rate is 4.9 children per woman, and cumulative fertility among women aged 45-49 is only 5.8, which suggests the presence of a fertility decline in Botswana. Knowledge and awareness of modern methods of contraception is high (95%), as is unmet need for contraception. 45% of women in union desired a delay or a stop to childbearing. Trends suggest a further decline in births to 4.5 within five years. High rates of teenage pregnancy and discontinued schooling are trends which suggest higher or sustained high fertility. Family life education in schools has not yet had an impact on fertility. High fertility may be maintained by the high proportion of visiting unions and a high ideal family size. Contraceptive use has increased, but discontinuation rates are also high. Reduced migration to South Africa could increase fertility due to the reuniting of couples. Future declines in fertility are considered to be dependent upon the success of the family planning program.
Michigan Extended School Year Programs 1992-1995. An Evaluation of a State Grant Initiative.
ERIC Educational Resources Information Center
Axelrad-Lentz, Susan F.
Michigan lawmakers funded a competitive grant program for school districts to plan and implement extended school year (ESY) programs of 200 days. The primary purpose was to raise academic achievement. In the spring of 1992, 16 diverse school districts were awarded ESY planning grants. Continuation grants funded 2 ESY implementation years, for…
Strategic Plan for Fiscal Years 2007-12
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
Five years after the bipartisan passage of the "No Child Left Behind Act of 2001," the U.S. Department of Education remains dedicated to promoting education excellence in every corner of the country. The Department's "Strategic Plan for Fiscal Years 2007-12" sets high expectations for America's schools and students, and for…
Strategic Plan. Vermont State Board of Education: Department of Education
ERIC Educational Resources Information Center
Vermont Department of Education, 2004
2004-01-01
The five-year plan is expressed in the five goals listed below, which are based on the respective Board and department roles and responsibilities. (1) Support high-quality, innovative instruction to improve student achievement; (2) Provide and promote high-quality educational leadership; (3) Promote safe and positive learning environments; (4)…
General RMP Guidance - Chapter 3: Five-Year Accident History
This involves the reporting of significant accidental releases of one or more of the regulated toxic or flammable substances from a covered process in the five years prior to the submission of an initial or updated Risk Management Plan.
77 FR 54615 - Strategic Management Program; Fiscal Year 2013-2016 Strategic Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
... Manager, Strategic Management Program; National Transportation Safety Board, 490 L'Enfant Plaza SW., MD-1... NATIONAL TRANSPORTATION SAFETY BOARD Strategic Management Program; Fiscal Year 2013-2016 Strategic Plan AGENCY: National Transportation Safety Board. ACTION: Notice: Request for comments. SUMMARY: This...
ERIC Educational Resources Information Center
Buttram, Joan L.; Covert, Robert W.
The Discrepancy Evaluation Model (DEM), developed in 1966 by Malcolm Provus, provides information for program assessment and program improvement. Under the DEM, evaluation is defined as the comparison of an actual performance to a desired standard. The DEM embodies five stages of evaluation based upon a program's natural development: program…
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2013 CFR
2013-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2014 CFR
2014-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2012 CFR
2012-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2011 CFR
2011-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
45 CFR 284.40 - When is a corrective action plan due?
Code of Federal Regulations, 2010 CFR
2010-10-01
... METHODOLOGY FOR DETERMINING WHETHER AN INCREASE IN A STATE OR TERRITORY'S CHILD POVERTY RATE IS THE RESULT OF... result of the TANF program(s) in the State, its child poverty rate increased by five percent or more for...
Commissioning of the first chambers of the CMS GE1/1 muon station
NASA Astrophysics Data System (ADS)
Ressegotti, Martina; CMS Muon Group
2017-12-01
The upgrades of the LHC planned in the next years will increase the instantaneous luminosity up to 5 × 1034 cm -2 s -1 after Long Shutdown 3, a value about five times higher than the nominal one for which the CMS experiment was designed. The resulting larger rate of interactions will produce a higher pileup environment that will challenge the trigger system of the CMS experiment in its original configuration, in particular in the endcap region. As part of the upgrade program of the CMS muon endcaps, additional muon detectors based on Gas Electron Multiplier (GEM) technology will be installed, in order to be able to sustain a physics program during high-luminosity operation without performance losses. The installation of the GE1/1 station is scheduled for Long Shutdown 2 in 2019-2020 already a demonstrator composed of five superchambers has been installed during the Extended Year-End Technical Stop at the beginning of 2017. Its goal is to test the system’s operational conditions and also to demonstrate the integration of the GE1/1 chambers into the CMS online system. The status of the installation and commissioning of the GE1/1 demonstrator is presented.
Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority
1992-09-01
The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less
Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview
NASA Technical Reports Server (NTRS)
1991-01-01
This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.
Pathfinder Project: Five-Year Strategic Plan.
ERIC Educational Resources Information Center
Pellissippi State Technical Community Coll., Knoxville, TN.
This 5-year strategic plan (prepared in 1994) from Pellissippi State Technical Community College in Tennessee examines macro environmental factors (including social, government, economic and technological trends); internal and external market share trends and opportunities; micro environmental factors (including organizational structure, financial…
NASA Administrator James Webb and Lewis Director Abe Silverstein
1961-12-21
National Aeronautics and Space Administration (NASA) Administrator James Webb toured the new Plum Brook Reactor Facility in December 1961 with Abe Silverstein, the newly appointed Director of the Lewis Research Center. The 60-megawatt test reactor was built on 500 acres of the former Plum Brook Ordnance Works in Sandusky, Ohio. After nearly five years of construction, the facility went critical for the first time in June 1961. In late 1957 Hugh Dryden requested Silverstein’s assistance in creating the new space agency. After several months of commuting, Silverstein transferred to Headquarters in May 1958. Silverstein was a critical member of a team that devised a fiscal year 1960 budget and began planning missions. When NASA officially began operation on October 1, 1958, Silverstein was third in command. He directed mission planning, spacecraft design, launch operations, manned space missions, and unmanned probes. James Webb, named NASA administrator on January 7, 1961, sought to have those working on Apollo at the NASA centers report to a new Headquarters program office, not to the head of the Apollo Program. Silverstein requested to be appointed to the vacant center director position in Cleveland. He officially returned as director of the Lewis Research Center on November 1, 1961.
National Conference on Integrated Resource Planning: Proceedings
NASA Astrophysics Data System (ADS)
Until recently, state regulators have focused most of their attention on the development of least-cost or integrated resource planning (IRP) processes for electric utilities. A number of commissions are beginning to scrutinize the planning processes of local gas distribution companies (LDCs) because of the increased control that LDCs have over their purchased gas costs (as well as the associated risks) and because of questions surrounding the role and potential of gas end-use efficiency options. Traditionally, resource planning (LDCs) has concentrated on options for purchasing and storing gas. Integrated resource planning involves the creation of a process in which supply-side and demand-side options are integrated to create a resource mix that reliably satisfies customers' short-term and long-term energy service needs at the lowest cost. As applied to gas utilities, an integrated resource plan seeks to balance cost and reliability, and should not be interpreted simply as the search for lowest commodity costs. The National Association of Regulatory Utility Commissioners' (NARUC) Energy Conservation committee asked Lawrence Berkeley Laboratory (LBL) to survey state PUCs to determine the extent to which they have undertaken least cost planning for gas utilities. The survey included the following topics: status of state PUC least-cost planning regulations and practices for gas utilities; type and scope of natural gas DSM programs in effect, including fuel substitution; economic tests and analysis methods used to evaluate DSM programs; relationship between prudency reviews of gas utility purchasing practices and integrated resource planning; and key regulatory issues facing gas utilities during the next five years.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kula, G.; Jefferies, B.
1995-03-01
The unprecedented level of support that has been pledged to strengthen Government of Papua New Guinea (GoPNG) biodiversity conservation initiatives has re-identified an important fact that technical and infrastructure support must be complemented by programs that provide realistic opportunities for developing national capacity. Indications are that the next five years will present a range of challenging opportunities for the department to move from the intensive period of planning, which has been the focus of attention during the first phase of the National Forestry and Conservation Action Programme (NFCAP), into a sustained period of policy and project application. This paper examinesmore » processes under which strengthening programs contribute to national development objectives and complement accomplishment of the Department of Environment and Conservation Strategic Plan. An overview of the Global Environment Facility-Integrated Conservation and Development (ICAD) Project and coordination effort that are being made for biodiversity conservation projects in Papua New Guinea, are addressed.« less
Eclipse 2017: Through the Eyes of NASA
NASA Astrophysics Data System (ADS)
Mayo, Louis; NASA Heliophysics Education Consortium
2017-10-01
The August 21, 2017 total solar eclipse across America was, by all accounts, the biggest science education program ever carried out by NASA, significantly larger than the Curiosity Mars landing and the New Horizons Pluto flyby. Initial accounting estimates over two billion people reached and website hits exceeding five billion. The NASA Science Mission Directorate spent over two years planning and developing this enormous public education program, establishing over 30 official NASA sites along the path of totality, providing imagery from 11 NASA space assets, two high altitude aircraft, and over 50 high altitude balloons. In addition, a special four focal plane ground based solar telescope was developed in partnership with Lunt Solar Systems that observed and processed the eclipse in 6K resolution. NASA EDGE and NASA TV broadcasts during the entirity of totality across the country reached hundreds of millions, world wide.This talk will discuss NASA's strategy, results, and lessons learned; and preview some of the big events we plan to feature in the near future.
Bioenergy Technologies Office Multi-Year Program Plan: November 2014 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-11-01
This is the November 2014 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
Bioenergy Technologies Office Multi-Year Program Plan: March 2015 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2015-03-01
This is the March 2015 Update to the Multi-Year Program Plan, which sets forth the goals and structure of the Bioenergy Technologies Office. It identifies the RDD&D activities the Office will focus on over the next four years.
ERIC Educational Resources Information Center
National Fire Prevention and Control Administration (DOC), Washington, DC.
This curriculum guide for public fire educators was developed to assist them in planning and implementing fire educational programs for older Americans (over 65), adults, youthful firesetters, and children. This booklet's content is in four parts: (1) Over 65 and Fire Safety discusses five broad questions which provide the framework for planning…
Developing Career and Employability Skills: A US Case Study.
ERIC Educational Resources Information Center
Zinser, Richard
2003-01-01
Western Michigan University's technical teacher education program developed a course on teaching career and employability skills using state standards and benchmarks as a framework. Preservice teachers complete five projects: job shadowing, professional portfolio, written lesson plan, videotape and self-critique of lesson plan, and an application…
Site support program plan for ICF Kaiser Hanford Company
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dieterle, S.E.
1996-09-27
The Fiscal Year (FY) 1997 Inftastructure Program Site Support Program Plan (SSPP) addresses the mission objectives, workscope, work breakdown structures (WBS), management approach, and resource requirements for the Infrastructure Program. Attached to the plan are appendices that provide more detailed information associated with scope definition.
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
44 CFR 360.2 - Description of program.
Code of Federal Regulations, 2013 CFR
2013-10-01
... application, to be accompanied by a Training and Education (T&E) plan for a total of three years, only the... three year comprehensive Training and Education Program planning can proceed in a timely and logical... HOMELAND SECURITY PREPAREDNESS STATE ASSISTANCE PROGRAMS FOR TRAINING AND EDUCATION IN COMPREHENSIVE...
44 CFR 360.2 - Description of program.
Code of Federal Regulations, 2012 CFR
2012-10-01
... application, to be accompanied by a Training and Education (T&E) plan for a total of three years, only the... three year comprehensive Training and Education Program planning can proceed in a timely and logical... HOMELAND SECURITY PREPAREDNESS STATE ASSISTANCE PROGRAMS FOR TRAINING AND EDUCATION IN COMPREHENSIVE...
44 CFR 360.2 - Description of program.
Code of Federal Regulations, 2010 CFR
2010-10-01
... application, to be accompanied by a Training and Education (T&E) plan for a total of three years, only the... three year comprehensive Training and Education Program planning can proceed in a timely and logical... HOMELAND SECURITY PREPAREDNESS STATE ASSISTANCE PROGRAMS FOR TRAINING AND EDUCATION IN COMPREHENSIVE...
44 CFR 360.2 - Description of program.
Code of Federal Regulations, 2011 CFR
2011-10-01
... application, to be accompanied by a Training and Education (T&E) plan for a total of three years, only the... three year comprehensive Training and Education Program planning can proceed in a timely and logical... HOMELAND SECURITY PREPAREDNESS STATE ASSISTANCE PROGRAMS FOR TRAINING AND EDUCATION IN COMPREHENSIVE...
44 CFR 360.2 - Description of program.
Code of Federal Regulations, 2014 CFR
2014-10-01
... application, to be accompanied by a Training and Education (T&E) plan for a total of three years, only the... three year comprehensive Training and Education Program planning can proceed in a timely and logical... HOMELAND SECURITY PREPAREDNESS STATE ASSISTANCE PROGRAMS FOR TRAINING AND EDUCATION IN COMPREHENSIVE...
Louisiana Airport System Plan : financial assessment.
DOT National Transportation Integrated Search
1992-07-01
This report is intended to identify costs and estimates for the improvements identified for Louisiana airports participating in the five-year planning horizon. A database was developed from airport master plans and standard unit costs from recent Lou...
Reuben, David B.; Evertson, Leslie Chang; Wenger, Neil S.; Serrano, Katherine; Chodosh, Joshua; Ercoli, Linda; Tan, Zaldy S.
2013-01-01
Dementia is a chronic disease that requires both medical and social services to provide high quality of care and prevent complications. As a result of time constraints in practice, lack of systems-based approaches, and poor integration of community-based organizations (CBOs), the quality of care for dementia is poor compared to other diseases that affect older persons. The UCLA Alzheimer’s and Dementia Care (UCLA ADC) program partners with CBOs to provide comprehensive, coordinated, patient-centered care for patients with Alzheimer’s disease and other dementias. The goals of the program are to maximize patient function, independence and dignity, minimize caregiver strain and burnout and reduce unnecessary costs. The UCLA ADC program consists of five key components: patient recruitment and a dementia registry, structured needs assessments of patients in the registry and their caregivers, creation and implementation of individualized dementia care plans based on needs assessments and input from the primary care physicians, monitoring and revising care plans, as needed, and access 24/7, 365 days a year for assistance and advice. The program uses a co-management model with a nurse practitioner Dementia Care Manager working with primary care physicians and CBOs. Based on the first 150 patients served, the most common recommendations in the initial care plans were referrals to support groups (73%), Alzheimer’s Association Safe Return (73%), caregiver training (45%), and medication adjustment (41%). The program will be evaluated on its ability to achieve the triple aim of better care for individuals, better health for populations, and lower costs. PMID:24329821
United States Air Force Faculty Research Program 1989. Program Technical Report. Volume 4
1989-12-01
and B.A.’s. Five subjects were between 20 and 30 years of age; 16 be- 135-11 tween 31 and 40 years of age; five between 41 and 50 years of age; and...to 30 year range (two males and one female) and two were in the 40 to 50 year range (one female and one male). Of the five dark-eyed subjects, three...were in the 20 to 30 year range (one male and two females) while there were two dark-eyed subjects in the 40 to 50 year range (one male and one female
34 CFR 406.1 - What is the State-Administered Tech-Prep Education Program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... provides financial assistance for— (a) Planning and developing four-year or six-year programs designed to...) Planning and developing, in a systematic manner, strong, comprehensive links between secondary schools and...
Strategic plan for science-U.S. Geological Survey, Ohio Water Science Center, 2010-15
,
2010-01-01
This Science Plan identifies specific scientific and technical programmatic issues of current importance to Ohio and the Nation. An examination of those issues yielded a set of five major focus areas with associated science goals and strategies that the Ohio Water Science Center will emphasize in its program during 2010-15. A primary goal of the Science Plan is to establish a relevant multidisciplinary scientific and technical program that generates high-quality products that meet or exceed the expectations of our partners while supporting the goals and initiatives of the U.S. Geological Survey. The Science Plan will be used to set the direction of new and existing programs and will influence future training and hiring decisions by the Ohio Water Science Center.
Four years after the approval of its Comprehensive Conservation and Management Plan (CCMP), the San Juan Bay Estuary Program (SJBEP) is working towards the implementation stage of its 49 actions. During the last three years the program has focused its efforts in developing a coll...
DOT National Transportation Integrated Search
1995-09-01
This report provides the bicycle and pedestrian component of Direction 2020, : the DVRPC's long range transportation and land use plan for the Delaware Valley. : The Bicycle and Pedestrian Mobility Plan covers five counties located in : southeastern ...
Public Fire Education. First Edition. IFSTA 606.
ERIC Educational Resources Information Center
Laughlin, Jerry W., Ed.; And Others
This manual was developed to give the firefighter basic knowledge concerning the problem of reaching the public with an educational program. Focusing on fire education planning, the first of seven chapters presents a five-step planning process that involves identification, selection, design, implementation, and evaluation. Chapter 2 presents a…
Chattanooga State Technical Community College Marketing Plan 1981-82.
ERIC Educational Resources Information Center
Hoppe, Sherry; Haddock, David
Chattanooga State Technical Community College's (CSTCC's) marketing plan is presented in six parallel sections. The first of these deals with building the overall image of the college, increasing community awareness, and disseminating general information. The other five sections focus on marketing the following college programs and services:…
Tailoring the Interview Process for More Effective Personnel Selection.
ERIC Educational Resources Information Center
Saville, Anthony
Structuring the initial teacher employment interview adds validity to selection and appropriately utilizes human resources. Five aspects of an effective interview program include: (1) developing a job analysis plan; (2) reviewing the applications; (3) planning for the interview; (4) the interview instrument; and (5) legal implications. An…
action on the following subjects: Building a More Inclusive National Preservation Program Rightsizing Landscapes Action Plan Announcement of five new Preserve America Community designations Federal Budget
A case study of resources management planning with multiple objectives and projects
NASA Astrophysics Data System (ADS)
Peterson, David L.; Silsbee, David G.; Schmoldt, Daniel L.
1994-09-01
Each National Park Service unit in the United States produces a resources management plan (RMP) every four years or less. The plans commit budgets and personnel to specific projects for four years, but they are prepared with little quantitative and analytical rigor and without formal decision-making tools. We have previously described a multiple objective planning process for inventory and monitoring programs (Schmoldt and others 1994). To test the applicability of that process for the more general needs of resources management planning, we conducted an exercise on the Olympic National Park (NP) in Washington State, USA. Eight projects were selected as typical of those considered in RMPs and five members of the Olympic NP staff used the analytic hierarchy process (AHP) to prioritize the eight projects with respect to their implicit management objectives. By altering management priorities for the park, three scenarios were generated. All three contained some similarities in rankings for the eight projects, as well as some differences. Mathematical allocations of money and people differed among these scenarios and differed substantially from what the actual 1990 Olympic NP RMP contains. Combining subjective priority measures with budget dollars and personnel time into an objective function creates a subjective economic metric for comparing different RMP’s. By applying this planning procedure, actual expenditures of budget and personnel in Olympic NP can agree more closely with the staff’s management objectives for the park.
Nevers, Meredith Becker; Whitman, Richard L.
2004-01-01
Phytoplankton species have been widely used as indicators of lake conditions, and they may be useful for detecting changes in overall lake condition. In an attempt to inventory and monitor its natural resources, the National Park Service wants to establish a monitoring program for aquatic resources in the Great Lakes Cluster National Parks. This study sought to establish baseline information on the phytoplankton and water chemistry of selected lakes in five national parks in a preliminary effort toward establishing a long-term monitoring program. Phytoplankton and water chemistry samples were collected from ten lakes in five national parks over a two-year period. A total of 176 taxa were identified during the study. Northern lakes generally had higher Shannon-Wiener diversity and clustered together in similarity. Lakes exhibited a south to north gradient of many water chemistry variables, with northern lakes having lower hardness, sulfate, turbidity, and temperature and higher dissolved oxygen. Chloride and sulfate concentrations were the variables that best explained variation among phytoplankton in the ten lakes. A monitoring plan will have to incorporate the differences among lakes, but by coordinating the effort, comparisons within and among parks and other regions will prove useful for determining environmental change.
Five-year trends in antiretroviral usage and drug costs in HIV-infected children in Thailand.
Collins, Intira; Cairns, John; Le Coeur, Sophie; Pagdi, Karin; Ngampiyaskul, Chaiwat; Layangool, Prapaisri; Borkird, Thitiporn; Na-Rajsima, Sathaporn; Wanchaitanawong, Vanichaya; Jourdain, Gonzague; Lallemant, Marc
2013-09-01
As antiretroviral treatment (ART) programs mature, data on drug utilization and costs are needed to assess durability of treatments and inform program planning. Children initiating ART were followed up in an observational cohort in Thailand. Treatment histories from 1999 to 2009 were reviewed. Treatment changes were categorized as: drug substitution (within class), switch across drug class (non nucleoside reverse-transcriptase inhibitors (NNRTI) to/from protease inhibitor (PI)), and to salvage therapy (dual PI or PI and NNRTI). Antiretroviral drug costs were calculated in 6-month cycles (US$ 2009 prices). Predictors of high drug cost including characteristics at start of ART (baseline), initial regimen, treatment change, and duration on ART were assessed using mixed-effects regression models. Five hundred seven children initiated ART with a median 54 (interquartile range, 36-72) months of follow-up. Fifty-two percent had a drug substitution, 21% switched across class, and 2% to salvage therapy. When allowing for drug substitution, 78% remained on their initial regimen. Mean drug cost increased from $251 to $428 per child per year in the first and fifth year of therapy, respectively. PI-based and salvage regimens accounted for 16% and 2% of treatments prescribed and 33% and 5% of total costs, respectively. Predictors of high cost include baseline age ≥ 8 years, non nevirapine-based initial regimen, switch across drug class, and to salvage regimen (P < 0.005). At 5 years, 21% of children switched across drug class and 2% received salvage therapy. The mean drug cost increased by 70%. Access to affordable second- and third-line drugs is essential for the sustainability of treatment programs.
System design of the Pioneer Venus spacecraft. Volume 12: International cooperation
NASA Technical Reports Server (NTRS)
Kelly, R. S.
1973-01-01
A spectrum of plans has been prepared to illustrate the range of practical sharing possibilities available so as to assist Ames Research Center (ARC) and European Space Research Organization (ESRO) in selection of a program meeting mutual goals. Five plans are described showing increased participation by ESRO WITH ascending plan number. Each of these has sharing properties fulfilling particular requirements such as available ESRO budget level, extent of ESRO program responsibility, matching particular ESRO capability, and cost saving to ARC through sharing. All plans apply to orbiter sharing only. A sharing plan based on the model Plan 4 may offer the most attractive division of Pioneer Venus between ARC and ESRO. This plan allows ESRO to bear primary responsibility for the orbiter and to avoid an extensive financial burden. Savings to ARC are commensurate with ARC loss of program control. Duplication of effort is avoided by using orbiter subsystems that are common to the probe bus and orbiter.
Bishop, Christine E; Ryan, Andrew M; Gilden, Daniel M; Kubisiak, Joanna; Thomas, Cindy Parks
2009-01-01
Objective To estimate the impact of a soft cap (a ceiling on utilization beyond which insured enrollees pay a higher copayment) on low-income elders' use of prescription drugs. Data Sources and Setting Claims and enrollment files for the first year (June 2002 through May 2003) of the Illinois SeniorCare program, a state pharmacy assistance program, and Medicare claims and enrollment files, 2001 through 2003. SeniorCare enrolled non-Medicaid-eligible elders with income less than 200 percent of Federal Poverty Level. Minimal copays increased by 20 percent of prescription cost when enrollee expenditures reached $1,750. Research Design Models were estimated for three dependent variables: enrollees' average monthly utilization (number of prescriptions), spending, and the proportion of drugs that were generic rather than brand. Observations included all program enrollees who exceeded the cap and covered two periods, before and after the cap was exceeded. Principle Findings On average, enrollees exceeding the cap reduced the number of drugs they purchased by 14 percent, monthly expenditures decreased by 19 percent, and the proportion generic increased by 4 percent, all significant at p<.01. Impacts were greater for enrollees with greater initial spending, for enrollees without one of five chronic illness diagnoses in the previous calendar year, and for enrollees with lower income. Conclusions Near-poor elders enrolled in plans with caps or coverage gaps, including Part D plans, may face sharp declines in utilization when they exceed these thresholds. PMID:19291168
Tennessee long-range transportation plan : 10-year strategic investments program
DOT National Transportation Integrated Search
2005-12-01
The 10-Year Strategic Investments Program report identifies proposed spending priorities and policy initiatives that will address many of Tennessees transportation needs and help implement the states new Long-Range Transportation Plan (LRTP) ov...
ERIC Educational Resources Information Center
Doggette, John R.
This study was conducted to provide a basis for planning for needed energy-related occupational technology programs in two-year educational institutions. A questionnaire was sent to 1,152 junior, community, and technical colleges in fall 1975; 774 (67%) responded. The survey identified 62 existing one- and two-year energy-related programs and 132…
UPWP Unified Planning Work Program
DOT National Transportation Integrated Search
1995-05-01
The Unified Plannrng Work Program (UPWP) iS the planning document that guides the MPO staff in fulfilling its planning responstbilities for the upcoming year. Comprised of tasks that can be changed as the planning needs change. It is intended to serv...
Dona Ana Branch Community College Five-Year Plan: Adopted 1989, Revised 1990-1991.
ERIC Educational Resources Information Center
New Mexico State Univ., Las Cruces. Dona Ana Branch Community Coll.
In 1990-91, responding to the rapid growth and change of both community and college, New Mexico State University's (NMSU's) Dona Ana Branch Community College (DABCC) revised its 5-year plan which was adopted in 1989 to establish goals that would shape the actions, policies, and plans of the college. These goals included: (1) increase instructional…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
...-0002] Invitation for Public Comment on Draft DOT Research, Development and Technology Strategic Plan... for public comment on its draft strategic plan, U.S. Department of Transportation, Research, Development and Technology Strategic Plan FY 2013-2018. The new five-year strategic plan will guide the...
Micro-Level Educational Planning and Management. Case Studies from India.
ERIC Educational Resources Information Center
Bhushan, Satya; And Others
In the Fifth Five Year Plan, the Indian Planning Commission recommended "democratic decentralization" to help remove disparities at the local level. Priorities were to be adult literacy and universal elementary education, with emphasis on adopting a multilevel approach to educational planning. The idea was to provide action plans at the…
ERIC Educational Resources Information Center
Schwab, Richard L.; DeFranco, Thomas C.; McGivney-Burelle, Jean
2004-01-01
The article discusses the Integrated Bachelor's/Master's (IB/M) Teacher Preparation, a five-year teacher preparation program that integrates coursework, school-based clinic experiences, and university and K-12 faculty in the preparation of pre-service teachers. A major component of the IB/M program is the relationship with selected public school…
Taylor Proposes Five-Year Child-Care Program.
ERIC Educational Resources Information Center
Taylor, Glen
Senator Glen Taylor of Minnesota proposed a five-year child-care program for the purposes of encouraging employer-sponsored child care and increasing by 53,000 the number of children in low-income families who were covered. This report lists central features of the program, which include: (1) tax incentives which employers can use when they build…
DOT National Transportation Integrated Search
1997-01-01
Congress recently requested the Intelligent Transportation Systems (ITS) Joint Program Office and the National Highway Traffic Safety Administration to update the 1992 ITS plan to deal with the fiscal year 1997 through fiscal year 2002 period, and...
FHWA planning and environmental linkages annual report fiscal year 2011.
DOT National Transportation Integrated Search
2012-01-20
This report highlights the Federal Highway Administration's (FHWA) Planning and Environment Linkages (PEL) program activities for Fiscal Year 2011 (FY11). The PEL program's purpose is to provide transportation agencies with tools and resources to int...
Li, Yuh-Shiow; Yu, Wen-Pin; Liu, Chin-Fang; Shieh, Sue-Heui; Yang, Bao-Huan
2014-10-27
Abstract Background: Learning style is a major consideration in planning for effective and efficient instruction and learning. Learning style has been shown to influence academic performance in the previous research. Little is known about Taiwanese students' learning styles, particularly in the field of nursing education. Aim: This purpose of this study was to identify the relationship between learning styles and academic performance among nursing students in a five-year associate degree of nursing (ADN) program and a two-year bachelor of science in nursing (BSN) program in Taiwan. Methods/Design: This study employed a descriptive and exploratory design. The Chinese version of the Myers-Briggs Type Indicator (MBTI) Form M was an instrument. Data such as grade point average (GPA) were obtained from the Office of Academic Affairs and the Registrar computerized records. Descriptive statistics, one-way analysis of variance ANOVA) and chi-square statistical analysis were used to explore the relationship between academic performance and learning style in Taiwanese nursing students. Results/Findings: The study sample included 285 nursing students: 96 students in a two-year BSN program, and 189 students in a five-year ADN program. Two common learning styles were found: introversion, sensing, thinking, and judging (ISTJ); and introversion, sensing, feeling, and judging (ISFJ). A sensing-judging pair was identified in 43.3% of the participants. Academic performance was significantly related to learning style (p < 0.05, d.f. = 15). Conclusion: The results of this study can help educators devise classroom and clinical instructional strategies that respond to individual needs in order to maximize academic performance and enhance student success. A large sample is recommended for further research. Understanding the learning style preferences of students can enhance learning for those who are under performing in their academic studies, thereby enhancing nursing education.
The 1985 long-range program plan
NASA Technical Reports Server (NTRS)
1984-01-01
That continual evolution of NASA's research and development, is reflected in the missions, goals, and objectives planned for FY1985 and later years, in accordance with the responsibilities by the National Aeronautics and Space Act of 1958, as amended. New starts for the next ten years and space program activities to year 2000 are highlighted including space science and applications, space flight, space station, space tracking and data systems, and space research and technology. Space programs for the early 21st century and aeronautics programs up to and beyond the year 2000 are also covered.
Hou, Shu-Wei
2008-10-01
Analyze and probe a part of contents in The Channels, Collaterals and Acupoints Science, a national plan teaching material of "the tenth five-year plan", and put forward own opinion on compilation of the teaching materials. Various concepts of acupoints should strive to be strict and terse; location of acupoints should be accurate and conform to clinical practice and reduce errors; the new edition The Channels, Collaterals and Acupoints Science should reasonably select and supplement for extra-ordinary points; increase explanation of the point name, function of acupoints, and association of acupoints; enrich the contents of acupuncture manipulation; reasonably increase and reduce extracts of ancient and modern reports to conform to development of the new age.
MnDOT Library strategic plan : final report.
DOT National Transportation Integrated Search
2017-06-01
MnDOTs Senior Leadership asked MnDOT Library to develop a Strategic Plan that identifies and reviews the challenges facing the Library over the next five years to better address the evolving needs of the department and users. The strategic plan is...
DOT National Transportation Integrated Search
2015-04-01
This Integration Plan for the Central New Mexico Climate Change Scenario Planning Project (CCSP) provides useful information on strategies that the Mid-Region Council of Governments (MRCOG) and its partners can pursue over the next five years to adap...
Small-wind-systems application analysis. Technical report and executive summary
NASA Astrophysics Data System (ADS)
1981-06-01
A small wind energy conversion systems (SWECS) analysis was conducted to estimate the potential market for SWEC, or wind machines smaller than 100 kW for five selected applications. The goals were to aid manufacturers in attaining financing by convincing venture capital investors of the potential of SWECS and to aid government planners in allocating R and D expenditures that will effectively advance SWECS commercialization. Based on these goals, the study: (1) provides a basis for assisting the DOE in planning R and D programs that will advance the state of SWECS industry; (2) quantifies estimates of market size vs. installed system cost to enable industry to plan expansion of capacity and product lines; (3) identifies marketing strategies for industry to use in attaining financing from investors and in achieving sales goals; and (4) provides DOE with data that will assist in determining actions, incentives, and/or legislation required to achieve a commercially viable SWECS industry. The five applications were selected through an initial screening and priority-ranking analysis. The year of analysis was 1985, but all dollar amounts, such as fuel costs, are expressed in 1980 dollars. The five SWECS applications investigated were farm residences, non-farm residences, rural electric cooperatives, feed grinders, and remote communities.
Birth of a megaproject: Political economy of flood control in bangladesh
NASA Astrophysics Data System (ADS)
Boyce, James K.
1990-07-01
A major flood control initiative has been launched in Bangladesh under the coordination of the World Bank. The bank's five-year Action Plan is intended to initiate a long-term investment program, the specifics of which remain to be determined. Long-term proposals under consideration include the construction of massive embankments along the great rivers of the Bangladesh delta. The wisdom of such a “structural solution” to Bangladesh's flood problems can be questioned on economic, environmental, and technical grounds. Regrettably, the decision-making process has not encouraged wide debate on these questions.
2011-03-02
John C. Stennis Space Center is celebrating its 50th anniversary in 2011. NASA announced plans to build a rocket engine test facility in Hancock County, Miss., on Oct. 25, 1961. A new anniversary logo highlights the theme of the anniversary year - celebrating Stennis as a unique federal city and its five decades of powering America's space dreams. Stennis is home to more than 30 federal, state, academic and private organizations and several technology-based companies. In addition to testing Apollo Program rocket stages that carried humans to the moon, Stennis tested every main engine used in more than 130 space shuttle flights.
NASA Technical Reports Server (NTRS)
Chiaramonte, Fran
2003-01-01
This viewgraph presentation discusses the status and goals for the NASA OBPR Physical Science Research Program. The following text was used to summarize the presentation. The OBPR Physical Sciences Research program has been comprehensively reviewed and endorsed by National Research Council. The value and need for the research have been re-affirmed. The research program has been prioritized and resource re-allocations have been carried out through an OBPR-wide process. An increasing emphasis on strategic, mission-oriented research is planned. The program will strive to maintain a balance between strategic and fundamental research. A feasible ISS flight research program fitting within the budgetary and ISS resource envelopes has been formulated for the near term (2003-2007). The current ISS research program will be significantly strengthened starting 2005 by using discipline dedicated research facility racks. A research re-planning effort has been initiated and will include active participation from the research community in the next few months. The research re-planning effort will poise PSR to increase ISS research utilization for a potential enhancement beyond ISS IP Core Complete. The Physical Sciences research program readily integrates the cross-disciplinary requirements of the NASA and OBPR strategic objectives. Each fundamental research thrust will develop a roadmap through technical workshops and Discipline Working Groups (DWGs). Most fundamental research thrusts will involve cross-disciplinary efforts. A Technology Roadmap will guide the Strategic Research for Exploration thrust. The Research Plan will integrate and coordinate fundamental Research Thrusts Roadmaps with the Technology Roadmap. The Technology Roadmap will be developed in coordination with other OBPR programs as well as other Enterprise (R,S,M,N). International Partners will contribute to the roadmaps and through research coordination. The research plan will be vetted with the discipline working groups, the BPRAC subcommittees, and with the BPRAC. Recommendations from NRC past and current committees will be implemented whenever appropriate.Proposed theme element content will be "missionized" around planned content and potential new projects (facilities, modules, initiatives) on approximately a five-year horizon, with the approval of PSRD management. Center/science working group teams will develop descriptions of "mission" objectives, value, and requirements. Purpose is to create a competitive environment for concept development and to stimulate community ownership/advocacy. Proposed theme elements reviewed and approved by PSRD management. Strawman roadmaps for themes developed. Program budget and technology requirements verified. Theme elements are prioritized with the input of advisory groups. Integration into program themes (questions) and required technology investments are defined by science and technology roadmaps. Review and assessment by OBPR management.
Instructor-Coordinator's Handbook for Post-Secondary Distribution and Marketing Programs.
ERIC Educational Resources Information Center
Holder, Doyle
This handbook is designed to help Texas junior/community college administrators and instructor-coordinators of marketing and distributive education to plan, implement, operate, and expand mid-management programs. The handbook contains five sections. Following the introductory first section that reviews the purpose, history, philosophy, and…
Alternative Fuels Data Center: Connecting Dots and Bridging Gaps:
, opened February 2016. The Governor's Office of Energy is also administering a five-year program to reduce redesignate the corridors within five years of the establishment of the corridors, and every five years
The impact of an online disease management program on medical costs among health plan members.
Schwartz, Steven M; Day, Brian; Wildenhaus, Kevin; Silberman, Anna; Wang, Chun; Silberman, Jordan
2010-01-01
This study evaluated the economic impact of an online disease management program within a broader population health management strategy. A retrospective, quasi-experimental, cohort design evaluated program participants and a matched cohort of nonparticipants on 2003-2007 claims data in a mixed model. The study was conducted through Highmark Inc, Blue Cross Blue Shield, covering 4.8 million members in five regions of Pennsylvania. Overall, 413 online self-management program participants were compared with a matched cohort of 360 nonparticipants. The costs and claims data were measured per person per calendar year. Total payments were aggregated from inpatient, outpatient, professional services, and pharmacy payments. The costs of the online program were estimated on a per-participant basis. All dollars were adjusted to 2008 values. The online intervention, implemented in 2006, was a commercially available, tailored program for chronic condition self management, nested within the Blues on Call(SM) condition management strategy. General linear modeling (with covariate adjustment) was used. Data trends were also explored using second-order polynomial regressions. Health care costs per person per year were $757 less than predicted for participants relative to matched nonparticipants, yielding a return on investment of $9.89 for every dollar spent on the program. This online intervention showed a favorable and cost-effective impact on health care cost.
Underwood, J. Michael; Lakhani, Naheed; Rohan, Elizabeth; Moore, Angela; Stewart, Sherri L.
2015-01-01
Introduction Centers for Disease Control and Prevention’s (CDC) National Comprehensive Cancer Control Program (NCCCP) funds states, the District of Columbia, tribal organizations, territories, and jurisdictions across the USA develop and implement jurisdiction-specific comprehensive cancer control (CCC) plans. The objective of this study was to analyze NCCCP action plan data for incorporation and appropriateness of cancer survivorship-specific goals and objectives. Methods In August 2013, NCCCP action plans maintained within CDC’s Chronic Disease Management Information System (CDMIS) from years 2010 to 2013 were reviewed to assess the inclusion of cancer survivorship objectives. We used the CDMIS search engine to identify “survivorship” within each plan and calculated the proportion of programs that incorporate cancer survivorship-related content during the study period and in each individual year. Cancer survivorship objectives were then categorized by compatibility with nationally accepted, recommended strategies from the report A National Action Plan for Cancer Survivorship: Advancing Public Health Strategies (NAP). Results From 2010 to 2013, 94 % (n=65) of NCCCP action plans contained survivorship content in at least 1 year during the time period and 38 % (n=26) of all NCCCP action plans addressed cancer survivorship every year during the study period. Nearly 64 % (n=44) of NCCCP action plans included cancer survivorship objectives recommended in NAP. Conclusion Nearly all NCCCP action plans addressed cancer survivorship from 2010 to 2013, and most programs implemented recommended cancer survivorship efforts during the time period. Implications for Cancer Survivors NCCCP grantees can improve cancer survivorship support by incorporating recommended efforts within each year of their plans. PMID:25732543
An Aid for Planning Programs in Career Education.
ERIC Educational Resources Information Center
Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.
Offered as an aid for developing sequential occupational education programs, the publication presents a concept in career education planning beginning with kindergarten and continuing through adult years. Career education goals are defined, and steps in planning sequential programs are outlined as follows: (1) organization of the occupational…
Tethers in space: Birth and growth of a new avenue to space utilization
NASA Technical Reports Server (NTRS)
Vontiesenhausen, G.
1984-01-01
The evolution of the ideas of tether applications in space are traced from its origin in the last century past a dormant period of sixty-five years to the mid-seventies. At that time as a consequence of major revival efforts, NASA entered into serious investigations of the theoretical and practical feasibility of a large number of tethered concepts in space. These efforts culminated in the establishment of the Tethered Satellite System Project now at NASA in the advanced development phase. Extensive planning efforts are described, first, through a Tether Applications in Space Workshop which generated additional concepts and provided overall assessments and recommendations to NASA, and then through a NASA inter-center Tether Applications in Space Task Group which generated a four year program plan in the areas of further studies, technology, work and science and applications of tethers in space. An outlook into the future of tether applications that approaches some of the goals of the early visionaries is offered.
If You Build It, Will They Come? Tales of Developing a New Degree Program in Actuarial Science
ERIC Educational Resources Information Center
Marano, Lisa E.
2014-01-01
In 2007, the B.S. in Applied Mathematics program consisting of five concentrations, including Actuarial Science, began at West Chester University of Pennsylvania, and we graduated our first class (of one) that December. We describe our program, some ideas to consider when planning your own program, and share some of the successes of our program…
Developing a heart institute: the execution of a strategic plan.
Krawczeski, Catherine D; McDonald, Mark B
2013-01-01
The Heart Institute at Cincinnati Children's Hospital Medical Center was chartered in July 2008 with the purpose of integrating clinical cardiovascular medicine with basic science research to foster innovations in care of patients with congenital heart problems. The initial administrative steering committee included representation from a basic scientist, a cardiologist, and a cardiothoracic surgeon and was charged with the development of a strategic plan for the evolution of the Institute over a five-year horizon. Using structured focus groups and staff interviews, the vision, mission, and goals were identified and refined. An integrated implementation plan addressing recruitment, capitalization, infrastructure, and market opportunities was created and executed. The preliminary results demonstrated clinical outcome improvements, increased scientific and academic productivity, and financial sustainability. All of the goals identified in the initial planning sequence were achieved within the five-year time frame, prompting an early evaluation and revision of the strategic plan.
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress
2016-03-17
observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan
NDEA Language and Area Centers: A Report on the First Five Years.
ERIC Educational Resources Information Center
Bigelow, Donald N.; Legters, Lyman H.
This report documents a broad category of information concerning the first five years of the National Defense Education Act of 1958. Included in the report are the following chapters: (1) concept and practice in non-western area studies, (2) the language and area centers program, (3) impact of the centers program, (4) outlook for the program, and…
Five Years Later: Predicting Student Use of Journals in a New Water Resources Graduate Program
ERIC Educational Resources Information Center
Wirth, Andrea A.; Mellinger, Margaret
2011-01-01
Using citation analysis, the authors examined the journals cited in theses and dissertations over the first five years of the Water Resources Graduate Program at Oregon State University. These journal titles were compared to the titles predicted as being important in the 2003 Oregon State University Libraries new program (Category I) review. A…
NASA Astrophysics Data System (ADS)
Grier, J. A.; Atkinson, D. H.; Barlow, N.; Griffin, I.; Hoffman, J.; Kelly-Serrato, B.; Kesthelyi, L.; Klein, M.; Klug, S.; Kolvoord, B.; Lanagan, P.; Lebofsky, L. A.; Lindstrom, M.; Lopes, R.; Lowes, L.; Manifold, J.; Mastrapa, R.; Milazzo, M.; Miner, E.; Morris, P.; Runyon, C.; Sohus, A.; Urquhart, M.; Warasila, R. L.; Withers, P.; Wood, Chuck
2001-11-01
Education and Public Outreach (E/PO) activities are an integral part of NASA's mandated mission and detailed in its Strategic Plan. The Office of Space Science Solar System Exploration (OSS SSE) E/PO program has made great strides in defining priorities and achieving its goals in the last five years. The Education and Public Outreach panel for NASA's Decadal Survey has generated a list of key issues to be addressed for the years 2003-2013 to assist the OSS SSE in future prioritization and planning. Key issues under discussion include: improving the involvement of planetary science professionals in E/PO activities; combating scientific elitism; examining the association between E/PO programs and public relations; re-examining funding E/PO activities from an audience perspective as opposed to a mission-centered perspective; improving access to resources for scientists, educators, students and partner organizations; promoting communication between educational programs at NASA; and reaching traditionally underrepresented groups, women, minorities and the disabled with science education programs. The panel is developing a list of specific recommendations to be implemented to improve OSS SSE E/PO activities in the next decade. These recommendations deal with topics such as: the production of evaluated resource web sites for scientists and educators; the development of a policy of long-term funding for the maintenance of web sites and other tools after they are created; methods for reaching those who do not have computer access through television and public programs; and the development of a reward system to recognize and encourage scientist involvement in E/PO activities. Such key issues and recommendations will be presented, along with materials from current programs and initiatives for E/PO in the OSS SSE.
ERIC Educational Resources Information Center
Harrington, Julie
2015-01-01
The purpose of this quantitative study was to determine what, if any, impact that attending a four year old kindergarten program had on five year old kindergarteners reading ability as measured by Dominie testing, compared to those five year olds who did not attend a four year old program at Inman Elementary School. The significance of this study…
Northwest Forest Plan—the first 10 years (1994-2003): synthesis of monitoring and research results.
Richard W. Haynes; Bernard T. Bormann; Danny C. Lee; Jon R. Martin
2006-01-01
It has been 10 years since the Northwest Forest Plan (the Plan) came into being at the direction of President Clinton. This report synthesizes the status and trends of five major elements of the Plan: older forests, species, aquatic systems, socioeconomics, and adaptive management and monitoring. It synthesizes new science that has resulted from a decade of research....
Van Heest, Ann E; Agel, Julie
2012-01-18
Although women represented 58% of undergraduate students and 48% of medical students in the U.S. in the 2008-2009 academic year, only 13% of orthopaedic residents and only 4% of American Academy of Orthopaedic Surgeons (AAOS) Fellows in 2009 were women. Are all orthopaedic surgery programs in the U.S. equal in their ability to attract female medical students and train female orthopaedic surgeons? This study was undertaken to test the hypothesis that all Accreditation Council for Graduate Medical Education (ACGME)-accredited orthopaedic surgery residency programs in the U.S. train a similar number of female residents. Data for all ACGME-accredited orthopaedic surgery residency training programs in the U.S. for five academic years (2004-2005 through 2008-2009) were collected with use of the Graduate Medical Education (GME) Track database. Orthopaedic residency programs in the U.S. do not train women at an equal frequency. In the academic years from 2004-2005 through 2008-2009, forty-five programs had no female residents during at least one of the five academic years reviewed, and nine programs had no female residents during any of the years. More than fifty orthopaedic residency programs in the U.S. had an average of <10% female trainees over the five-year period, and more than ten programs had an average of >20%. There was no significant change in the distribution among these categories over the five years examined (p = 0.234). Significant differences in the representation of women exist among orthopaedic residency training programs in the U.S. Further examination of the characteristics of orthopaedic residency programs that are successful in attracting female residents, particularly the composition of their faculty as role models, will be important in furthering our understanding of how orthopaedic surgery can continue to attract the best and the brightest individuals. Changes in the cultural experiences in programs that have not trained female orthopaedic surgeons, such as an increased number of female faculty, and policies that emphasize diversity may provide a greater opportunity for our orthopaedic profession to attract female medical students.
Six-Year Planning Report for Crosby Library, Gonzaga University.
ERIC Educational Resources Information Center
Gonzaga Univ., Spokane, WA.
A response to a call for six-year planning documents from Gonzaga University's instructional units, this report is divided into five broad sections: (1) library collections, an assessment of Crosby Library's holdings and comparison with the overall quantitative standards established by the Association of College and Research Libraries; (2) library…
Consultants Help Families Pay Less for College
ERIC Educational Resources Information Center
Farrell, Elizabeth F.
2007-01-01
Five years ago, the National Institute of Certified College Planners, an organization that licenses college-planning professionals, did not exist. This year the organization has 1,200 registered members. Professionals in college financial planning say business is booming, and the bulk of demand for their services is coming from families with…
Cape Cod National Seashore alternative transportation systems long range planning study
DOT National Transportation Integrated Search
2003-05-01
This project involves the development of short-range and long-range plans for alternative transportation to, from, and within the Cape Cod National Seashore. The five-year plan notes that improved public transportation services are needed both to mit...
New Revenue Streams and Educational Infrastructure at IUPUI
ERIC Educational Resources Information Center
Sukhatme, Uday
2012-01-01
Dynamic planning, an approach to steadily put in motion some aspects of a strategic plan, even while the rest of the planning is in progress, has been used successfully over the past five years for implementing the IUPUI Academic Plan. The eleven major strategic initiatives that underlie the academic plan have enhanced the research, teaching, and…
Fitzgerald, Scott D; Reed, Willie M; Kaneene, John B
2007-01-01
An e-mail/telephone survey of all active North American residency training programs in veterinary pathology was conducted in September 2005. The purpose of this survey was to determine current numbers of trainees, their program length and type, and salaries; to compare current numbers to five years earlier; and, finally, to gauge interest in expanding current programs. All 41 training institutions contacted responded to the survey. Briefly, the survey found that there are currently 235 veterinary pathology residents, for a mean of 5.7 residents per training program. The number of residents currently in training programs and the number of applicants for these programs has increased compared to five years earlier. There is widespread interest in further expanding capacity in these programs, and the coalition of the American College of Veterinary Pathologists and the Society of Toxicologic Pathology is a well-known source of possible funding for additional residents. This survey report further documents the numbers of combined residency/PhD programs, average starting salaries for new residents, outside sponsorship effects on pathology training programs, and some of the common concerns regarding veterinary pathology training programs voiced by the respondents. While residency training capacity has expanded in the last five years, and there is widespread desire to further expand these training programs, a shortage of veterinary pathologists for future market needs will need to be addressed by increased funding from as yet unspecified sources.
Gomez, S S; Weber, A A; Emilson, C G
2001-01-01
A preventive dental program (PDP) instituted in pregnant women and comprising an educational and a preventive part was evaluated when their children were five and six years of age. Dental caries was examined in sixty-seven mother-child pairs belonging to the program and in sixty-nine control mother-child pairs. In the five-year-old children 87 percent of the PDP group were caries free compared with the 50 percent in the control group. Comparable figures for six-year-old children were 89 percent and 62 percent in the PDP and control group, respectively. The mean dft of the PDP children five and six years of age was 0.4 and 0.2, respectively, versus 1.3 and 1.4 for the control children. The differences in caries-free status and caries prevalence were statistically significant. In conclusion, the preventive dental program which started in pregnant women and continued in the mothers and their children were highly effective for a long-term reduction of dental caries.
2008-06-01
brachytherapy treatment planning has been demonstrated. Using the inverse planning program IPSA , dose escalation of target regions with a higher tumor...algorithm (called IPSA ) was used to generate dose distributions for five different levels of DIL- boost, at least 110%, 120%, 130%, 140% and 150...and LDR, VI Last Generation Radiotherapy Course, São Paulo, Brazil, Oct. 19, 2006. Principles and Clinical Applications of IPSA ; Nucletron
de Foy, Benjamin; Lu, Zifeng; Streets, David G.
2016-10-27
China’s twelfth Five-Year Plan included pollution control measures with a goal of reducing national emissions of nitrogen oxides (NO x) by 10% by 2015 compared with 2010. Multiple linear regression analysis was used on 11-year time series of all nitrogen dioxide (NO 2) pixels from the Ozone Monitoring Instrument (OMI) over 18 NO 2 hotspots in China. The regression analysis accounted for variations in meteorology, pixel resolution, seasonal effects, weekday variability and year-to-year variability. The NO 2 trends suggested that there was an increase in NO 2 columns in most areas from 2005 to around 2011 which was followed bymore » a strong decrease continuing through 2015. The satellite results were in good agreement with the annual official NO x emission inventories which were available up until 2014. We show the value of evaluating trends in emission inventories using satellite retrievals. It further shows that recent control strategies were effective in reducing emissions and that recent economic transformations in China may be having an effect on NO 2 columns. The satellite information for 2015 suggests that emissions have continued to decrease since the latest inventories available and have surpassed the goals of the twelfth Five-Year Plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
de Foy, Benjamin; Lu, Zifeng; Streets, David G.
China’s twelfth Five-Year Plan included pollution control measures with a goal of reducing national emissions of nitrogen oxides (NO x) by 10% by 2015 compared with 2010. Multiple linear regression analysis was used on 11-year time series of all nitrogen dioxide (NO 2) pixels from the Ozone Monitoring Instrument (OMI) over 18 NO 2 hotspots in China. The regression analysis accounted for variations in meteorology, pixel resolution, seasonal effects, weekday variability and year-to-year variability. The NO 2 trends suggested that there was an increase in NO 2 columns in most areas from 2005 to around 2011 which was followed bymore » a strong decrease continuing through 2015. The satellite results were in good agreement with the annual official NO x emission inventories which were available up until 2014. We show the value of evaluating trends in emission inventories using satellite retrievals. It further shows that recent control strategies were effective in reducing emissions and that recent economic transformations in China may be having an effect on NO 2 columns. The satellite information for 2015 suggests that emissions have continued to decrease since the latest inventories available and have surpassed the goals of the twelfth Five-Year Plan.« less
Social marketing program sales.
1987-01-01
This table presents data on social marketing program sales for projects that provide more than 5000 couple-years of protection. Cited are social marketing programs in Bangladesh, Costa Rica, Egypt, El Salvador, Guatemala, Honduras, India, Indonesia, Jamaica, Nepal, Pakistan, Peru, and Sri Lanka. Included in the table are data on program funding, product sales (generally condoms, pills, and foaming tablets), and couple-years of protection provided. Among the social marketing programs reporting particularly high couple-years of protection levels are the Bangladesh Family Planning Social Marketing Program (1,165,100), the Egyptian Family Planning Association's Family for the Future Program (732,200), India's Nirodh Marketing Program (2,225,000), and Pakistan's Social Marketing Contraceptive Program (280,000).
Cochi, Stephen L; Hegg, Lea; Kaur, Anjali; Pandak, Carol; Jafari, Hamid
2016-02-01
The world is closer than ever to achieving global polio eradication, with record-low polio cases in 2015 and the impending prospect of a polio-free Africa. Tens of millions of volunteers, social mobilizers, and health workers have participated in the Global Polio Eradication Initiative. The program contributes to efforts to deliver other health benefits, including health systems strengthening. As the initiative nears completion after more than twenty-five years, it becomes critical to document and transition the knowledge, lessons learned, assets, and infrastructure accumulated by the initiative to address other health goals and priorities. The primary goals of this process, known as polio legacy transition planning, are both to protect a polio-free world and to ensure that investments in polio eradication will contribute to other health goals after polio is completely eradicated. The initiative is engaged in an extensive transition process of consultations and planning at the global, regional, and country levels. A successful completion of this process will result in a well-planned and -managed conclusion of the initiative that will secure the global public good gained by ending one of the world's most devastating diseases and ensure that these investments provide public health benefits for years to come. Project HOPE—The People-to-People Health Foundation, Inc.
Program Review: A Critical Analysis of Departmental Effectiveness. Revised.
ERIC Educational Resources Information Center
Huffman, Zoula; And Others
Describing the evaluation and planning process at Mississippi Gulf Coast Community College, this document presents guidelines, procedures, and indicators used at the college for the systematic review of academic departmental effectiveness. First, the five-column program review model used at the college is outlined and the purposes of review are…
Occupational Therapy Assistants Program. Demonstration Project.
ERIC Educational Resources Information Center
Wisconsin State Board of Health, Madison.
Between November 1964 and June 1967, 85 women and five men completed a 4-month course held in several Wisconsin locations to prepare them as Certified Occupational Therapy Assistants to (1) plan and direct a general activity or supportive program of occupational therapy, (2) train individual patients in independent performance of activities of…
A Guide to Job Analysis for the Preparation of Job Training Programmes.
ERIC Educational Resources Information Center
Ceramics, Glass, and Mineral Products Industry Training Board, Harrow (England).
The paper deals with job analysis for the preparation of job training programs. The analytical approach involves five steps: enlisting support, examining the job, describing the job, analyzing training requirements, and planning the programs. Appendixes include methods of producing training schemes--the simple job breakdown, straightforward…
ERIC Educational Resources Information Center
Malm, Joakim; Bryngfors, Leif E.; Mörner, Lise-Lotte
2010-01-01
The study presents an evaluation of the SI program in five engineering programs within the Faculty of Engineering (LTH) based on data from questionnaires to SI participants and SI-Leaders, credits taken by the students during the first year, and average grade data from high school for the first year students. The results show that participation in…
National Civil Applications Program: strategic plan vision for 2005
,
2004-01-01
The National Mapping Division (NMD) has developed this comprehensive strategic plan to chart the course of the National Civil Applications Program (NCAP) over the next 5 years. To meet the challenges of the future, the NCAP is changing its program emphases, methods of responding to customer needs, and business practices. The NCAP Strategic Plan identifies the new direction for the program through a series of strategic thrusts and goals for managers to use in formulating plans, establishing program emphases, and determining resource needs and allocations.
Subaru SEEDS Survey of Exoplanets and Disks
NASA Astrophysics Data System (ADS)
McElwain, Michael W.; SEEDS Collaboration
2012-01-01
The Strategic Exploration of Exoplanets and Disks at Subaru (SEEDS) is the first strategic observing program (SSOPs) awarded by the National Astronomical Observatory of Japan (NAOJ). SEEDS targets a broad sample of stars that span a wide range of masses and ages to explore the formation and evolution of planetary systems. This survey has been awarded 120 nights over five years time to observe nearly 500 stars. Currently in the second year, SEEDS has already uncovered exciting new results for the protoplanetary disk AB Aur, transitional disk LkCa15, and nearby companion to GJ 758. We present the survey architecture, performance, recent results, and the projected sample. Finally, we will discuss planned upgrades to the high contrast instrumentation at the Subaru Telescope.
Signposts of Planets Observed by SEEDS
NASA Technical Reports Server (NTRS)
McElwain, Michael
2011-01-01
The Strategic Exploration of Exoplanets and Disks at Subaru (SEEDS) is the first strategic observing program (SSOPs) awarded by the National Astronomical Observatory of Japan (NAOJ). SEEDS targets a broad sample of stars that span a wide range of masses and ages to explore the formation and evolution of planetary systems. This survey has been awarded 120 nights over five years time to observe nearly 500 stars. Currently in the second year, SEEDS has already produced exciting new results for the protoplanetary disk AB AUf, transitional disk LkCa15, and nearby companion to GJ 758. We present the survey architecture, performance, recent results, and the projected sample. Finally, we will discuss planned upgrades to the high contrast instrumentation at the Subaru
Subaru SEEDS Survey of Exoplanets and Disks
NASA Technical Reports Server (NTRS)
McElwain, Michael W.
2012-01-01
The Strategic Exploration of Exoplanets and Disks at Subaru (SEEDS) is the first strategic observing program (SSOPs) awarded by the National Astronomical Observatory of Japan (NAOJ). SEEDS targets a broad sample of stars that span a wide range of masses and ages to explore the formation and evolution of planetary systems. This survey has been awarded 120 nights over five years time to observe nearly 500 stars. Currently in the second year, SEEDS has already produced exciting new results for the protoplanetary disk AB Aur, transitional disk LkCa15, and nearby companion to GJ 758. We present the survey architecture, performance, recent results, and the projected sample. Finally, we will discuss planned upgrades to the high contrast instrumentation at the Subaru Telescope
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwab, Amy
The Bioenergy Technologies Office is one of the 10 technology development offices within the Office of Energy Efficiency and Renewable Energy at the U.S. Department of Energy. This Multi-Year Program Plan (MYPP) sets forth the goals and structure of the Bioenergy Technologies Office (the Office). It identifies the research, development, and demonstration (RD&D), and market transformation and crosscutting activities the Office will focus on over the next five years and outlines why these activities are important to meeting the energy and sustainability challenges facing the nation. This MYPP is intended for use as an operational guide to help the Officemore » manage and coordinate its activities, as well as a resource to help communicate its mission and goals to stakeholders and the public.« less
Succession Planning and Management Practice in Washington State Local Public Health Agencies.
Wiesman, John M; Babich, Suzanne M; Umble, Karl; Baker, Edward L
2016-01-01
Turnover of top local public health officials is expected to be great, with 23% being 60 years of age or older, and another 42% being 50 to 59 years of age. Yet, we know little about the use of succession planning in public health agencies. Describe succession planning practices in local public health agencies. We conducted a Web-based, cross-sectional survey of succession planning practices and followed the career paths of public health officials for 40 months. The top local public health officials from Washington State's 35 local governmental public health agencies. Twenty-five succession planning best practices. All 35 agencies responded, resulting in a 100% response rate. Our study found evidence of succession planning practices in Washington State local public health agencies: 85% of agencies selected high-performing high potential employees for development, 76% sent them to formal technical and management/leadership training, 70% used cross-functional team projects, and 67% used stretch assignments to develop their employees. Impetuses to implement succession planning were discovering that large percentages of employees were able to retire soon and that national accreditation requires workforce development plans. Barriers to implementing succession planning included other competing demands for time, belief that the agency's workforce was too small for a formal program, and concerns that there would be union barriers. In 2012, 50% of the officials surveyed said that it would be at least possible that they would leave their current jobs within 5 years. Forty months later, 12 (34%) had left their positions. We were encouraged by the level of succession planning in Washington State and recommend creating a greater sense of urgency by focusing on agency retirement profiles and emphasizing the need for workforce development plans for accreditation. Developing the public health leaders of tomorrow is too important to be left to chance.
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2010 CFR
2010-04-01
... for the development, except for emergencies and essential non-routine maintenance necessary to... undertaken by the PHA in major work categories (e.g., kitchens, electrical systems, etc.); establishing...
44 CFR 201.6 - Local Mitigation Plans.
Code of Federal Regulations, 2010 CFR
2010-10-01
... agencies that have the authority to regulate development, as well as businesses, academia and other private... the mitigation plan within a five-year cycle. (ii) A process by which local governments incorporate...
Food management for the aging population.
Militello, J; Coleman, L J; Haran, E
1996-01-01
The older population is becoming more important to our society everyday. These individuals are being studied for their past, present, and potential impact on markets and marketing. Evaluated as a user of products or services in the marketplace or an employee or volunteer within the marketing system, this segment is gaining a visibility and importance. An interview was conducted with five Nutrition Project Directors to obtain an overview of Federally Funded Nutrition Programs for the Elderly. The areas which were highlighted were service delivery, site activities, management styles, barriers to service, clientele composition, food planning and preparation, staffing, USDA funding, coordination, marketing, transportation, and volunteerism. The Second Quarter Service Provider Output Reports for 1991, which are compiled by the Nutrition Projects and submitted to the Area Agency on Aging, were utilized to obtain client profile information (Reports, 1991). The analysis sought to compare the programs offered in the five counties on a number of factors which could be quantified. It was hoped that by looking at the numerical ratios, and depicting them graphically, any trends or unique characteristics of the programs could be identified. In that the percentage of Florida's present elder population (17%) far exceeds the national average (12%) these findings could be utilized by nutrition programs outside of Florida to plan for future funds. Analysis of quantitative information on the five programs yielded information on cost comparisons and on services.
Robotics Technology Crosscutting Program. Technology summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The Robotics Technology Development Program (RTDP) is a needs-driven effort. A length series of presentations and discussions at DOE sites considered critical to DOE`s Environmental Restoration and Waste Management (EM) Programs resulted in a clear understanding of needed robotics applications toward resolving definitive problems at the sites. A detailed analysis of the resulting robotics needs assessment revealed several common threads running through the sites: Tank Waste Retrieval (TWR), Contaminant Analysis Automation (CAA), Mixed Waste Operations (MWO), and Decontamination and Dismantlement (D and D). The RTDP Group also realized that some of the technology development in these four areas had commonmore » (Cross Cutting-CC) needs, for example, computer control and sensor interface protocols. Further, the OTD approach to the Research, Development, Demonstration, Testing, and Evaluation (RDDT and E) process urged an additional organizational breakdown between short-term (1--3 years) and long-term (3--5 years) efforts (Advanced Technology-AT). These factors lead to the formation of the fifth application area for Crosscutting and Advanced Technology (CC and AT) development. The RTDP is thus organized around these application areas -- TWR, CAA, MWO, D and D, and CC and AT -- with the first four developing short-term applied robotics. An RTDP Five-Year Plan was developed for organizing the Program to meet the needs in these application areas.« less
The career goals of nurses in some health care settings in Gauteng.
Jooste, K
2005-08-01
In nursing, purposeful career planning is essential if nurse practitioners want to make the right decisions about their work in order to strive towards and accomplish a meaningful quality of working life. Nurses should identify their career goals to be able to investigate their different career opportunities in their field of interest and direct their work according to a work strategy for years ahead. The purpose of this study was to explore and describe the career goals of post-basic nursing students with the aim of describing management strategies to guide the future career of post-basic nursing students in climbing the career ladder effectively and obtaining their set career goals. An explorative, descriptive, qualitative design was selected where the researcher worked inductively to explore and describe the needs (goals) and future planned actions of the participants regarding their career management as viewed for a period of five years. The researcher purposively and conveniently identified the sample as all the post-basic nursing students, namely 250 students, who were registered for the first, second and third year of nursing management courses in that period at a South African residential university. Two structured, open questions were developed. Each participant received the questions in writing and was asked to answer them. The QSR NUD*IST program was used for the qualitative management (categorization) of data. The results of the research questions related to five categories, namely becoming empowered, being promoted, being educated and professionally developed, partaking in research and taking up new projects.
Unified planning work program federal fiscal year 2008
DOT National Transportation Integrated Search
2008-01-01
This Unified Planning Work Program (UPWP) contains information about surface-transportation planning projects that will be conducted in the Boston metropolitan region during the period of October 1, 2007, through September 30, 2008 (federal fiscal ye...
Theising, Katie M; Fritschle, Traci L; Scholfield, Angelina M; Hicks, Emily L; Schymik, Michelle L
2015-11-01
Our objective was to describe the implementation and clinical outcomes of an employer-sponsored, pharmacist-provided medication therapy management (MTM) program for health plan beneficiaries with diabetes mellitus and/or hypertension. We conducted a single-center retrospective medical record review. The setting was a Pharmacy MTM Clinic at a self-insured health system consisting of six hospitals and several ancillary facilities. A total of 161 health plan beneficiaries with diabetes identified during annual wellness screenings for the health plan in 2012 and 225 health plan beneficiaries with diabetes and/or hypertension identified during annual wellness screenings for the health plan in 2013 were referred to the MTM clinic based on specific criteria. In 2012 the health system expanded its existing wellness program by implementing a voluntary diabetes care program for health plan beneficiaries with uncontrolled diabetes (hemoglobin A(1c) [A1C] 7% or higher); a similar program was added for hypertension for the 2013 plan year. All participants' A1C and blood pressure results were tracked from the date of their wellness screening through the end of the plan year. The pharmacists involved had the capability to directly implement drug regimen changes according to hospital protocol or provide recommendations to the physician, as specified by the referring physician. For the 2012-2013 plan year, the mean difference in A1C from baseline to program completion was -0.38% (95% confidence interval [CI] -0.58 to -0.18%, p<0.05). For beneficiaries with a baseline A1C of 7% or higher, the mean difference was -0.69% (95% CI -0.99 to -0.39%, p<0.05). For the 2013-2014 plan year, the mean difference in A1C from baseline to program completion was -0.62% (95% CI -0.81 to -0.44%, p<0.05). In that year, the mean difference in A1C for beneficiaries with A1C 7% or higher was -0.97% (95% CI -1.23 to -0.72%, p<0.05). For those referred for hypertension, a mean difference of -13 mm Hg (95% CI -18.59 to -7.73, p<0.05) from baseline to program completion was seen in systolic blood pressure, and the mean difference in diastolic blood pressure was -7 mm Hg (95% CI -9.92 to -4.04, p<0.05). This study demonstrated that health plan beneficiaries who participated in the employer-sponsored, pharmacist-provided MTM program had significant decreases in A1C and blood pressure. © 2015 Pharmacotherapy Publications, Inc.
A Five-Year School Building and Future Sites Program 1966-1970.
ERIC Educational Resources Information Center
1965
Five-year school building and site needs and related financial requirements are summarized for Milwaukee's schools. Educational policies concerning the school building program are stated, and consideration is given to factors affecting school board needs such as birth rate, public housing projects, urban renewal, highways, and expressways. School…
Bruning, Oliver
2018-05-23
Overview of the operation and upgrade plans for the machine. Upgrade studies and taskforces. The Chamonix 2010 discussions led to five new task forces: planning for a long shut down in 2012 for splice consolidation; long term consolidation planning for the injector complex; SPS upgrade task force (accelerated program for SPS upgrade); PSB upgrade and its implications for the PS (e.g. radiation etc.); LHC High Luminosity project (investigate planning for ONE upgrade by 2018-2020); Launch of a dedicated study for doubling the beam energy in the LHC->HE-LHC.
Skinner, Harvey A; Maley, Oonagh; Norman, Cameron D
2006-10-01
Health education and health promotion have a tradition of using information and communication technology (ICT). In recent years, the rapid growth of the Internet has created innovative opportunities for Web-based health education and behavior change applications-termed eHealth promotion. However, many eHealth promotion applications are developed without an explicit model to guide the design, evaluation, and ongoing improvement of the program. The spiral technology action research (STAR) model was developed to address this need. The model comprises five cycles (listen, plan, do, study, act) that weave together technological development, community involvement, and continuous improvement. The model is illustrated by a case study describing the development of the Smoking Zine (www.SmokingZine.org), a youth smoking prevention and cessation Web site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
The Annual Plan for the National Toxicology Program requires an annual review of toxicology-related research supported by DHHS agencies. Four of the five Public Health Service Agencies support research related to toxicology. Within the National Institutes of Health alone, sixteen separate institutes and several other components support relevant research. Toxicology-related research is also conducted by other Federal agencies--particularly the Department of Energy (DOE) and the Environmental Protection Agency (EPA). An overall review is thought to be of considerable interest to research managers for purposes of coordinating research and reducing unnecessary duplication. This is the seventeenth review responding to this requirement.more » For the fifteenth time a survey of similar research at DOE and the EPA is included.« less
Research on the Present Status of the Five-Year Medical Training Program in Chinese Medical Colleges
ERIC Educational Resources Information Center
Xu, Yan; Dong, Zhe; Miao, Le; Ke, Yang
2014-01-01
The five-year program is the main path for undergraduate medical training in China. Studies have shown that during the past eleven years, the scale of medical student enrollment increased annually with a relatively simple entrance exam. The ideas, teaching contents and methods, assessment and evaluation should be updated and improved. In general,…
Health benefits in 2014: stability in premiums and coverage for employer-sponsored plans.
Claxton, Gary; Rae, Matthew; Panchal, Nirmita; Whitmore, Heidi; Damico, Anthony; Kenward, Kevin
2014-10-01
The annual Kaiser Family Foundation/Health Research and Educational Trust Employer Health Benefits Survey found that in 2014 the average annual premium (employer and worker contributions combined) for single coverage was $6,025, similar to 2013. The premium for family coverage was $16,834--3 percent higher than a year ago. Average deductibles and most other cost-sharing amounts were similar to those in 2013. On average, in 2014 covered workers paid nearly $5,000 per year for family health insurance premiums, and 18 percent of covered workers were in a plan with an annual single coverage deductible of $2,000 or more. Fifty-five percent of employers offered health benefits in 2014, similar to 2013. The Affordable Care Act has not yet led to substantial changes in the employer-based market. However, the next few years could present a different picture as delayed provisions and other changes take effect. This year's survey included new questions on firms' policies related to enrolling spouses and dependents, enrollment in private exchanges, and the use of narrow networks and financial incentives for wellness programs. Project HOPE—The People-to-People Health Foundation, Inc.
Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress
2016-05-27
observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and
A study of topics for distance education-A survey of U.S. Fish and Wildlife Service employees
Ratz, Joan M.; Schuster, Rudy M.; Marcy, Ann H.
2011-01-01
The purpose of this study was to identify training topics and distance education technologies preferred by U.S. Fish and Wildlife Service employees. This study was conducted on behalf of the National Conservation Training Center to support their distance education strategy planning and implementation. When selecting survey recipients, we focused on employees in positions involving conservation and environmental education and outreach programming. We conducted the study in two phases. First, we surveyed 72 employees to identify useful training topics. The response rate was 61 percent; respondents were from all regions and included supervisors and nonsupervisors. Five topics for training were identified: creating and maintaining partnerships (partnerships), technology, program planning and development (program planning), outreach methods to engage the community (outreach methods), and evaluation methods. In the second phase, we surveyed 1,488 employees to assess preferences for training among the five topics identified in the first survey and preferences among six distance education technologies: satellite television, video conferencing, audio conferencing, computer mediated training, written resources, and audio resources. Two types of instructor-led training were included on the survey to compare to the technology options. Respondents were asked what types of information, such as basic facts or problem solving skills, were needed for each of the five topics. The adjusted response rate was 64 percent; respondents were from all regions and included supervisors and nonsupervisors. The results indicated clear preferences among respondents for certain training topics and technologies. All five training topics were valued, but the topics of partnerships and technology were given equal value and were valued more than the other three topics. Respondents indicated a desire for training on the topics of partnerships, technology, program planning, and outreach methods. For the six distance education technologies, respondents indicated different levels of usability and access. Audio conferencing and written resources were reported to be most usable and accessible. The ratings of technology usability/access differed according to region; respondents in region 9 rated most technologies higher on usability/access. Respondents indicated they would take courses through either onsite or distance education approaches, but they prefer onsite training for most topics and most types of information.
The Arthropod-Borne Animal Diseases Research Laboratory: Research Program: Update and Current Status
USDA-ARS?s Scientific Manuscript database
The ABADRL has three 5-year project plans under two ARS National Research Programs. One project plan under the Animal Health National Program is entitled “Countermeasures to control and eradicate Rift Valley fever (RVF)”. Research objectives in this plan are 1) to determine the vector competence of ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anita Gianotto; Dena Tomchak
As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.
Coppieters, Y; Béduwé, C; Collignon, J L; Hubens, V; Levêque, A
2010-01-01
Cardiovascular diseases remain the first cause of mortality in Belgium and are a priority for the Five-year program of health promotion in the French speaking Community. It is declined in operational programs by priority thematics, including the heart health. With this framework, it appeared necessary to operationalize cardiovascular priorities. A process of systemic and participative planning was set up in order to seek operational strategies and actions, and to cover the whole population and actors concerned with these health problems. The various cardiovascular risk factors, which potentiate one another, are approached together and in a global way. Upstream to the risk factors, social health determinants play an important role in cardiovascular diseases and others diseases like cancers. Tracking cardiovascular risk factors among people 30 to 75 years is also proposed. It makes it possible to identify people at risk and to put forward individual and adapted measures. The plan integrates actions of health promotion (acting on the health determinants and factors which influence them) as well as actions aiming at improving tracking and the accompaniment of the patients in secondary and tertiary prevention. Actions on health determinants and the factors influencing them present moreover the advantage of being often common to many chronic diseases.
Planning for & implementing intensive cultural long & short range planning
Lester W. Hazelton
1977-01-01
Great Northern Paper, a major industrial forest owner in Maine (2,000,000 acres), began a program for more intensive silviculture in 1972. The first step has been a major woodlands reorganization into five geographical districts with forest management and procurement responsibilities delegated to these districts. This has been accompanied by a re-inventory of...
Laboratory Directed Research and Development Program FY2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
none, none
2012-04-27
Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less
Workshop proceedings: Information Systems for Space Astrophysics in the 21st Century, volume 1
NASA Technical Reports Server (NTRS)
Cutts, James (Editor); Ng, Edward (Editor)
1991-01-01
The Astrophysical Information Systems Workshop was one of the three Integrated Technology Planning workshops. Its objectives were to develop an understanding of future mission requirements for information systems, the potential role of technology in meeting these requirements, and the areas in which NASA investment might have the greatest impact. Workshop participants were briefed on the astrophysical mission set with an emphasis on those missions that drive information systems technology, the existing NASA space-science operations infrastructure, and the ongoing and planned NASA information systems technology programs. Program plans and recommendations were prepared in five technical areas: Mission Planning and Operations; Space-Borne Data Processing; Space-to-Earth Communications; Science Data Systems; and Data Analysis, Integration, and Visualization.
7 CFR 4290.310 - Contents of application.
Code of Federal Regulations, 2010 CFR
2010-01-01
... (a)(1) of that section, as determined solely by the Secretary; (3) Has a viable business plan... business plan. The Applicant must submit a comprehensive business plan covering at least a five-year period... Agriculture Regulations of the Department of Agriculture (Continued) RURAL BUSINESS-COOPERATIVE SERVICE AND...
DOT National Transportation Integrated Search
2011-07-15
"Metropolitan Planning Organizations (MPOs) are required by Federal law to develop a long-range Metropolitan Transportation Plan (MTP) at least every five years. This research focuses on assessing the trade-offs between business-as-usual MTP scenario...
Korenromp, Eline; Hamilton, Matthew; Sanders, Rachel; Mahiané, Guy; Briët, Olivier J T; Smith, Thomas; Winfrey, William; Walker, Neff; Stover, John
2017-11-07
In malaria-endemic countries, malaria prevention and treatment are critical for child health. In the context of intervention scale-up and rapid changes in endemicity, projections of intervention impact and optimized program scale-up strategies need to take into account the consequent dynamics of transmission and immunity. The new Spectrum-Malaria program planning tool was used to project health impacts of Insecticide-Treated mosquito Nets (ITNs) and effective management of uncomplicated malaria cases (CMU), among other interventions, on malaria infection prevalence, case incidence and mortality in children 0-4 years, 5-14 years of age and adults. Spectrum-Malaria uses statistical models fitted to simulations of the dynamic effects of increasing intervention coverage on these burdens as a function of baseline malaria endemicity, seasonality in transmission and malaria intervention coverage levels (estimated for years 2000 to 2015 by the World Health Organization and Malaria Atlas Project). Spectrum-Malaria projections of proportional reductions in under-five malaria mortality were compared with those of the Lives Saved Tool (LiST) for the Democratic Republic of the Congo and Zambia, for given (standardized) scenarios of ITN and/or CMU scale-up over 2016-2030. Proportional mortality reductions over the first two years following scale-up of ITNs from near-zero baselines to moderately higher coverages align well between LiST and Spectrum-Malaria -as expected since both models were fitted to cluster-randomized ITN trials in moderate-to-high-endemic settings with 2-year durations. For further scale-up from moderately high ITN coverage to near-universal coverage (as currently relevant for strategic planning for many countries), Spectrum-Malaria predicts smaller additional ITN impacts than LiST, reflecting progressive saturation. For CMU, especially in the longer term (over 2022-2030) and for lower-endemic settings (like Zambia), Spectrum-Malaria projects larger proportional impacts, reflecting onward dynamic effects not fully captured by LiST. Spectrum-Malaria complements LiST by extending the scope of malaria interventions, program packages and health outcomes that can be evaluated for policy making and strategic planning within and beyond the perspective of child survival.
NASA earth science and applications division: The program and plans for FY 1988-1989-1990
NASA Technical Reports Server (NTRS)
1988-01-01
Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.
Assessment of the Fshery Improvement Opportunities on the Pend Oreille River, 1990 Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ashe, Becky L.; Lillengreen, Kelly L.; Vella, John J.
1991-03-01
The purpose of this study was to assess the fishery improvement opportunities on the Box Canyon portion of the Pend Oreilla River. This three year study was initiated as part of the Northwest Power Planning Council's 1987 Columbia River Basin Fish and Wildlife Program. This report contains the findings of the third and final year of the study. The objectives of the third year of the study were to determine the relative abundance of each species in the river and sloughs; the population levels in five selected tributaries and, if possible, for fish in the river and sloughs; each speciesmore » growth rate, feeding habits abundance preferred prey, and migration patterns; and the seasonal movement patterns and habitat utilization of largemouth bass. 64 refs., 8 figs., 263., tabs.« less
ERIC Educational Resources Information Center
Ulutas, Aysegul; Kanak, Mehmet
2016-01-01
This study aims to analyze the effect of the Mother and Child Education Program on the relationship between mothers and their five- or six-year-old children. The study used an experimental design of pretest-posttest-monitoring test with a control group. The participants consisted of 50 preschool children aged five or six along with their mothers.…
RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McGinnis and Associates LLC
2008-08-01
The Scotts Valley Band of Pomo Indians is located in Lake County in Northern California. Similar to the other five federally recognized Indian Tribes in Lake County participating in this project, Scotts Valley Band of Pomo Indians members are challenged by generally increasing energy costs and undeveloped local energy resources. Currently, Tribal decision makers lack sufficient information to make informed decisions about potential renewable energy resources. To meet this challenge efficiently, the Tribes have committed to the Lake County Tribal Energy Program, a multi Tribal program to be based at the Robinson Rancheria and including The Elem Indian Colony, Bigmore » Valley Rancheria, Middletown Rancheria, Habematolel Pomo of Upper Lake and the Scotts Valley Pomo Tribe. The mission of this program is to promote Tribal energy efficiency and create employment opportunities and economic opportunities on Tribal Lands through energy resource and energy efficiency development. This program will establish a comprehensive energy strategic plan for the Tribes based on Tribal specific plans that capture economic and environmental benefits while continuing to respect Tribal cultural practices and traditions. The goal is to understand current and future energy consumption and develop both regional and Tribe specific strategic energy plans, including action plans, to clearly identify the energy options for each Tribe.« less
Ecological Monitoring and Compliance Program Fiscal Year 2002 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. A. Wills
2002-12-01
The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species andmore » important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.« less
Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)
DOE Office of Scientific and Technical Information (OSTI.GOV)
C. A. Wills
2002-12-01
The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species andmore » important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species' distribution, burrow use, reproduction, activity patterns, and food habits. Bat roost sites within seven buildings slated for demolition were identified, and a BN biologist was a contributing author of the Nevada Bat Conservation Plan published by the Nevada Bat Working Group. Thirty-three adult horses and five foals were counted this year. Six active raptor nests (two American kestrel, two Red-tailed hawk, and two Great-horned owl nests) were found and monitored this year. Selected wetlands and man-made water sources were monitored for physical parameters and wildlife use. No dead animals were observed this year in any plastic-lined sump. The chemical release test plan for one experiment at the HAZMAT Spill Center on Frenchman Lake playa was reviewed. Seasonal sampling of downwind and upwind transects near the spill center was conducted to document baseline conditions of biota.« less
ERIC Educational Resources Information Center
Galligani, Dennis J.
An update of the University of California, Irvine, Student Affirmative Action (SAA) plan is presented for 1985-1986. SAA activities planned by both academic and administrative units are covered, such as activities designed to: stimulate greater student involvement, establish clearer life goals and career linkages, enhance cultural awareness, and…
Thinking around the Corner: The Development of Planning Abilities
ERIC Educational Resources Information Center
Kaller, Cristopher P.; Rahm, Benjamin; Spreer, Joachim; Mader, Irina; Unterrainer, Josef M.
2008-01-01
The ability to plan and search ahead is essential for problem solving in most situations in everyday life. To investigate the development of planning and related processes, a sample of four- and five-year-old children was examined in a variant of the Tower of London, a frequently used neuropsychological assessment tool of planning abilities. The…
Camp, Richard J.; Judge, Seth W.; Hart, Patrick J.; Kudray, Greg; Gaudioso, Jacqueline M.; Hsu, Bobby H.
2012-01-01
The National Park Service (NPS) created the Inventory and Monitoring (I&M) Program in 1998 to establish baseline information and assess long-term trends in "vital signs" or key abiotic and biotic elements of National Parks (Fancy et al. 2009). The Pacific Island Network of the I&M Program developed a Landbirds Monitoring Protocol (LMP; Camp et al. 2011) to estimate species-specific status and monitor longterm trends in landbird distribution and abundance. Parks included in the LMP that harbor habitat critically important to native forest birds are Haleakala National Park (Maui Island), Hawai'i Volcanoes National Park (HAVO; Hawai'i Island), and the National Park of American Samoa (American Samoa). In 2010, the LMP was implemented in HAVO to survey landbird density and abundance. This implementation was the first anywhere in the Pacific Islands by the I&M Program, and continued monitoring is planned every five years in all three parks.
DOT National Transportation Integrated Search
2016-09-01
To support the peer exchange focus on improving the visibility and impact of the research : program, the agenda (Appendix A) was structured around five key topic areas presented : below. The NHDOT planning team developed amplifying questions for each...
Course Outline Workshop III: Paraprofessional Training.
ERIC Educational Resources Information Center
Burron, Arni, Comp.; Santopietro, Kathy, Comp.
The materials in this teaching guide represent the third quarter of a community college program designed to teach paraprofessionals how to tutor in an adult literacy program. Techniques for teaching reading and English as a second language are included. Lesson plans for five classes cover the informal reading inventory, review and practice in the…
The Five-Point Plan: A Practical Framework for Campus Cultural Centers
ERIC Educational Resources Information Center
Jenkins, Toby S.
2008-01-01
This article features Paul Robeson Cultural Center (PRCC) at Pennsylvania State University, which uses a model of cultural education and engagement to design and deliver programs and services committed to enhancing the university's cultural climate. This article shares a cultural programming framework that was used to steward change and growth in…
NASA Technical Reports Server (NTRS)
Meyers, A. P.; Davidson, W. A.; Gortowski, R. C.
1973-01-01
Detailed drawings of the five year tape transport are presented. Analytical tools used in the various analyses are described. These analyses include: tape guidance, tape stress over crowned rollers, tape pack stress program, response (computer) program, and control system electronics description.
State Appalachian Development Plans and Investment Programs for Fiscal Year 1979. Abstracts.
ERIC Educational Resources Information Center
1979
One component of the Appalachian Regional Commission's regional plan process is the annual review and approval of individual state development policies. The state summaries of proposed programs for fiscal year 1979 (for Alabama, Georgia, Kentucky, Maryland, Mississippi, New York, North Carolina, Ohio, Pennsylvania, South Carolina, Tennessee,…
Fiscal Year 2007 Program Performance Plan
ERIC Educational Resources Information Center
US Department of Education, 2006
2006-01-01
The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…
ERIC Educational Resources Information Center
State Univ. of New York, Buffalo. Western New York School Study Council.
Although the public is best served by governmental agencies which have integrated the major functions of planning, managing, and budgeting, it can be asserted that the planning function is paramount. A review of the evolution of public agency administration in the U.S. reveals that until recent years the planning function has been largely…
Ohio MPO and large city program SFY 2012 summary.
DOT National Transportation Integrated Search
2012-07-01
The Ohio Department of Transportation (ODOT) annually : suballocates Federal Highway Administration (FHWA) : capital funding budgets to each of Ohios seventeen : Metropolitan Planning Organizations (MPOs), and to five : large cities located outsid...
TRAC-PF1/MOD1 pretest predictions of MIST experiments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boyack, B.E.; Steiner, J.L.; Siebe, D.A.
Los Alamos National Laboratory is a participant in the Integral System Test (IST) program initiated in June 1983 to provide integral system test data on specific issues and phenomena relevant to post small-break loss-of-coolant accidents (SBLOCAs) in Babcock and Wilcox plant designs. The Multi-Loop Integral System Test (MIST) facility is the largest single component in the IST program. During Fiscal Year 1986, Los Alamos performed five MIST pretest analyses. The five experiments were chosen on the basis of their potential either to approach the facility limits or to challenge the predictive capability of the TRAC-PF1/MOD1 code. Three SBLOCA tests weremore » examined which included nominal test conditions, throttled auxiliary feedwater and asymmetric steam-generator cooldown, and reduced high-pressure-injection (HPI) capacity, respectively. Also analyzed were two ''feed-and-bleed'' cooling tests with reduced HPI and delayed HPI initiation. Results of the tests showed that the MIST facility limits would not be approached in the five tests considered. Early comparisons with preliminary test data indicate that the TRAC-PF1/MOD1 code is correctly calculating the dominant phenomena occurring in the MIST facility during the tests. Posttest analyses are planned to provide a quantitative assessment of the code's ability to predict MIST transients.« less
Cancer control activities in the Republic of Korea.
Yoo, Keun-Young
2008-05-01
South Korea has a population of 47.3 million. The whole population is covered by a mandatory social insurance system (the National Health Insurance Program) that is financed through the contributions paid by the insured and their employers. Cancer has been the leading cause of death in Korea since 1983. About 130 000 people develop cancer annually with 66 000 deaths in 2006. Cancer patients' 5-year survival rates between 1998 and 2002 were 37.8 and 57.0% for men and women, respectively. The five leading primary cancer sites were stomach, lung, liver, colon and rectum, and bladder among males, whereas the most common cancers were stomach, breast, colon and rectum, uterine cervix and lung among females. With the rapidly aging population, reducing cancer burden at the national level has become one of the major political issues in Korea. The government formulated its first 10-year plan for cancer control in 1996. In 2000, the National Cancer Center was created and the Cancer Control Division was set up within the Ministry of Health and Welfare. The Cancer Control Act was legislated in 2003. Korea's major national cancer control programs are anti-smoking campaigns, hepatitis B virus vaccination, cancer registration and networking, promotion of R&D activities for cancer control, education and training for cancer control and prevention, operation of the national cancer information center, operation of the mass screening program for five common cancers, management of cancer patients at home, financial support for cancer patients and designation of regional cancer centers.
Characteristics of ovulation method acceptors: a cross-cultural assessment.
Klaus, H; Labbok, M; Barker, D
1988-01-01
Five programs of instruction in the ovulation method (OM) in diverse geographic and cultural settings are described, and characteristics of approximately 200 consecutive OM acceptors in each program are examined. Major findings include: the religious background and family size of acceptors are variable, as is the level of previous contraceptive use. Acceptors are drawn from a wide range of socioeconomic and religious backgrounds; however, family planning intention was similarly distributed in all five countries. In sum, the ovulation method is accepted by persons from a variety of backgrounds within and between cultural setting.
Code of Federal Regulations, 2013 CFR
2013-10-01
... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...
Code of Federal Regulations, 2010 CFR
2010-10-01
... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...
Code of Federal Regulations, 2011 CFR
2011-10-01
... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...
Code of Federal Regulations, 2014 CFR
2014-10-01
... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...
Code of Federal Regulations, 2012 CFR
2012-10-01
... its boundaries or is within the 10-mile plume exposure pathway Emergency Planning Zone of such site... planning zone of a site shall exercise their plans and preparedness related to ingestion exposure pathway measures at least once every five years in conjunction with a plume exposure pathway exercise for that site...
29 CFR 4010.8 - Plan actuarial information.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) Terminated vested participants, and (iii) Active participants; (2) The fair market value of the plan's assets... used to determine the benefit liabilities in paragraph (a)(3) of this section; (5) The funding target... consecutive period of at least five plan years; (6) The funding target attainment percentage (as of the...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2011 CFR
2011-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2012 CFR
2012-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
24 CFR 968.315 - Comprehensive Plan (including five-year action plan).
Code of Federal Regulations, 2013 CFR
2013-04-01
... comprehensive plan including, but not limited to, the physical and management needs assessments, viability...) Physical needs assessment—(i) Requirements. The physical needs assessment identifies all of the work that a... physical needs assessment is completed without regard to the availability of funds, and shall include the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Létourneau, Daniel, E-mail: daniel.letourneau@rmp.uh.on.ca; Department of Radiation Oncology, University of Toronto, Toronto, Ontario; McNiven, Andrea
2013-05-01
Purpose: The objective of this work was to develop a collaborative quality assurance (CQA) program to assess the performance of intensity modulated radiation therapy (IMRT) planning and delivery across the province of Ontario, Canada. Methods and Materials: The CQA program was designed to be a comprehensive end-to-end test that can be completed on multiple planning and delivery platforms. The first year of the program included a head-and-neck (H and N) planning exercise and on-site visit to acquire dosimetric measurements to assess planning and delivery performance. A single dosimeter was used at each institution, and the planned to measured dose agreementmore » was evaluated for both the H and N plan and a standard plan (linear-accelerator specific) that was created to enable a direct comparison between centers with similar infrastructure. Results: CQA program feasibility was demonstrated through participation of all 13 radiation therapy centers in the province. Planning and delivery was completed on a variety of infrastructure (treatment planning systems and linear accelerators). The planning exercise was completed using both static gantry and rotational IMRT, and planned-to-delivered dose agreement (pass rates) for 3%/3-mm gamma evaluation were greater than 90% (92.6%-99.6%). Conclusions: All centers had acceptable results, but variation in planned to delivered dose agreement for the same planning and delivery platform was noted. The upper end of the range will provide an achievable target for other centers through continued quality improvement, aided by feedback provided by the program through the use of standard plans and simple test fields.« less
An Education and Development Program for Michigan's State Health Planning Advisory Council.
ERIC Educational Resources Information Center
Michigan State Office of Health and Medical Affairs, Lansing.
The report describes a Federally supported education and development program conducted during the 1973-74 fiscal year for members of the Michigan State Health Planning Advisory Council. The program sought to increase: (1) the council members' awareness of and insight into the comprehensive health planning process, (2) their knowledge of the health…
ERIC Educational Resources Information Center
Morphet, Edgar L., Ed.; Jesser, David L., Ed.
The fifth in a series of reports related to long-range educational planning includes five papers presented at a conference in Albuquerque March 21-22, 1968. The first paper outlines the primary goals of an educational program and considers implications of the program for the curriculum, instructional practices, supporting services, evaluation,…
ERIC Educational Resources Information Center
Reiff, Tana, Ed.
This guide, which is intended for administrators of programs providing adult basic and literacy education (ABLE) services in Pennsylvania, contains 59 individually authored papers devoted to planning, managing, and improving ABLE programs. The following are among the topics discussed in the guide's five sections: understanding the role of the ABLE…
NASA Information Resources Management Long Range Plan, FY 1994-1998
NASA Technical Reports Server (NTRS)
1993-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.
FY 1998 Proposed Rail Improvement Program
DOT National Transportation Integrated Search
1997-01-01
The Illinois Department of Transportation has, in the past, published its Rail program yearly, and its Rail plan as needs dictate. The department has combined : both documents into one. This new document, as with those Programs and Plans : that have ...
INTEGRATING HEALTH TECHNOLOGY ASSESSMENT PRINCIPLES IN FORMULARY MANAGEMENT.
Teng, Monica; Khoo, Ai Leng; Zhao, Ying Jiao; Lin, Liang; Lim, Boon Peng
2016-01-01
Effective formulary management in healthcare institutions safeguards rational drug use and optimizes health outcomes. We implemented a formulary management program integrating the principles of health technology assessment (HTA) to improve the safe, appropriate, and cost-effective use of medicine in Singapore. A 3-year formulary management program was initiated in 2011 in five public healthcare institutions. This program was managed by a project team comprising HTA researchers. The project team worked with institutional pharmacy and therapeutics (P&T) committees to: (i) develop tools for formulary drug review and decision making; (ii) enhance the HTA knowledge and skills of formulary pharmacists and members of P&T committees; (iii) devise a prioritization framework to overcome resource constraints and time pressure; and (iv) conceptualize and implement a framework to review existing formulary. Tools that facilitate drug request submission, drug review, and decision making were developed for formulary drug inclusion. A systematic framework to review existing formulary was also developed and tested in selected institutions. A competency development plan was rolled out over 2 years to enhance formulary pharmacists' proficiency in systematic literature search and review, meta-analysis, and pharmacoeconomic evaluation. The plan comprised training workshops and on-the-job knowledge transfer between the project team and institutional formulary pharmacists through collaborating on selected drug reviews. A resource guide that consolidated the tools and templates was published to encourage the adoption of best practices in formulary management. Based on the concepts of HTA, we implemented an evidence-based approach to optimize formulary management.
ERIC Educational Resources Information Center
Santa Monica Coll., CA. Office of Institutional Research.
This report is the 1999 Santa Monica College Educational Master Plan revision. In 1997, the College adopted its first formal Master Plan for Education. Every three to five years, depending on the circumstances, that plan will be completely redone. During the intervening time period, there will be annual revisions to the plan. This revision…
23 CFR 450.332 - Annual listing of obligated projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... calendar days following the end of the program year, the State, public transportation operator(s), and the... 450.332 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING ASSISTANCE AND STANDARDS Metropolitan Transportation Planning and Programming § 450.332 Annual...
DOT National Transportation Integrated Search
2007-01-01
In order to be eligible for federal funds, urbanized areas are required to maintain a continuing, cooperative, and comprehensive (3C) transportation planning process that results in plans and programs consistent with the planning objectives of the me...
Closing the Gaps and Filling the STEM Pipeline: A Multidisciplinary Approach
NASA Astrophysics Data System (ADS)
Doerschuk, Peggy; Bahrim, Cristian; Daniel, Jennifer; Kruger, Joseph; Mann, Judith; Martin, Cristopher
2016-08-01
There is a growing demand for degreed science, technology, engineering and mathematics (STEM) professionals, but the production of degreed STEM students is not keeping pace. Problems exist at every juncture along the pipeline. Too few students choose to major in STEM disciplines. Many of those who do major in STEM drop out or change majors. Females and minorities remain underrepresented in STEM. The success rate of college students who are from low-income background or first-generation students is much lower than that of students who do not face such challenges. Some of those who successfully complete their degree need help in making the transition to the workforce after graduation. A program at Lamar University takes a multidisciplinary approach to addressing these problems. It is designed to recruit, retain and transition undergraduates to careers in STEM, focusing its efforts on five science disciplines and on these "at-risk" students. The program was supported by a 5-year grant from the National Science Foundation and is supported through August 31, 2016 by Lamar University and a grant from ExxonMobil. A formal assessment plan documents the program's success. The program received an award from the Texas Higher Education Board for its contributions towards Closing the Gaps in Higher Education in Texas. This paper describes the program's theoretical framework, research questions, methods, evaluation plan, and instruments. It presents an analysis of the results achieved using these methods and implications for improvements to the program resulting from lessons learned.
FAA airborne data link human factors research plan
DOT National Transportation Integrated Search
1993-07-01
This report contains a five-year plan to perform research of human factors issues and topics : related to Data Link implementations in general aviation and transport category aircraft. : Elements such as resource allocation and management and coordin...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... five-year Essential Fish Habitat review, the Governor's South Atlantic Alliance Action Plan, a status report on Gulf oil spill activities, habitat assessments conducted through the National Habitat Plan...
Fatmi, Zafar; Hadden, Wilbur C; Razzak, Junaid A; Qureshi, Huma I; Hyder, Adnan A; Pappas, Gregory
2007-07-10
National level estimates of injuries are not readily available for developing countries. This study estimated the annual incidence, patterns and severity of unintentional injuries among persons over five years of age in Pakistan. National Health Survey of Pakistan (NHSP 1990-94) is a nationally representative survey of the household. Through a two-stage stratified design, 18, 315 persons over 5 years of age were interviewed to estimate the overall annual incidence, patterns and severity of unintentional injuries for males and females in urban and rural areas over the preceding one year. Weighted estimates were computed adjusting for complex survey design using surveyfreq and surveylogistic option of SAS 9.1 software. The overall annual incidence of all unintentional injuries was 45.9 (CI: 39.3-52.5) per 1000 per year; 59.2 (CI: 49.2-69.2) and 33.2 (CI: 27.0-39.4) per 1000 per year among males and females over five years of age, respectively. An estimated 6.16 million unintentional injuries occur in Pakistan annually among persons over five years of age. Urban and rural injuries were 55.9 (95% CI: 48.1-63.7) and 41.2 (95% CI: 32.2-50.0) per 1000 per year, respectively. The annual incidence of injuries due to falls were 22.2 (95% CI: 18.0-26.4), poisoning 3.3 (95%CI: 0.5-6.1) and burn was 1.5 (95%CI: 0.9-2.1) per 1000 per year. The majority of injuries occurred at home 19.2 (95%CI: 16.0-22.4) or on the roads 17.0 (95%CI: 13.8-20.2). Road traffic/street, school and urban injuries were more likely to result in handicap. There is high burden of unintentional injuries among persons over five years of age in Pakistan. These results are useful to plan further studies and prioritizing prevention programs on injuries nationally and other developing countries with similar situation.
The commercial health insurance industry in an era of eroding employer coverage.
Robinson, James C
2006-01-01
This paper analyzes the commercial health insurance industry in an era of weakening employer commitment to providing coverage and strengthening interest by public programs to offer coverage through private plans. It documents the willingness of the industry to accept erosion of employment-based enrollment rather than to sacrifice earnings, the movement of Medicaid beneficiaries into managed care, and the distribution of market shares in the employment-based, Medicaid, and Medicare markets. The profitability of the commercial health insurance industry, exceptionally strong over the past five years, will henceforth be linked to the budgetary cycles and political fluctuations of state and federal governments.
U.S. Geological Survey Global Seismographic Network - Five-Year Plan 2006-2010
Leith, William S.; Gee, Lind S.; Hutt, Charles R.
2009-01-01
The Global Seismographic Network provides data for earthquake alerting, tsunami warning, nuclear treaty verification, and Earth science research. The system consists of nearly 150 permanent digital stations, distributed across the globe, connected by a modern telecommunications network. It serves as a multi-use scientific facility and societal resource for monitoring, research, and education, by providing nearly uniform, worldwide monitoring of the Earth. The network was developed and is operated through a partnership among the National Science Foundation (http://www.nsf.gov), the Incorporated Research Institutions for Seismology (http://www.iris.edu/hq/programs/gsn), and the U.S. Geological Survey (http://earthquake.usgs.gov/gsn).
ERIC Educational Resources Information Center
Pennsylvania State Dept. of Public Welfare, Harrisburg. Office of Mental Retardation.
This paper presents a five-year plan for the improvement of Pennsylvania's system of services for people with mental retardation and their families. It was developed over an 18-month period by 70 people, including people with disabilities, family members, advocates, providers of service, legislative staff, and county and state government…
Petros, Ryan; Solomon, Phyllis
2015-11-01
Illness self-management (ISM) programs for adults with serious mental illness offer strategies to increase self-directed recovery activities to maximize wellness and increase independence from the service delivery system. This article describes five of the most popular ISM programs: Pathways to Recovery, The Recovery Workbook, Building Recovery of Individual Dreams and Goals through Education and Support, Wellness and Recovery Action Planning, and Illness Management and Recovery. It provides guidance for administrators, practitioners, and consumers for the purposes of selecting the program or programs providing the best fit. The framework for describing the five programs encompasses four contextual domains that supplement empirical evidence for a more comprehensive evaluation: structure, value orientation toward recovery, methods of teaching, and educational content. Contextual domains distinguish programs from one another, including length and time commitment, requisite resources, inclusion of group support, utilization of medical language and pathology, degree of traditional didactic education, and prioritization of consumer-driven self-exploration. The authors also searched PsycINFO, Google Scholar, and Cochrane Reviews for empirical evidence and evaluated the five programs on the strength of the evidence and the effectiveness of the intervention. Evidence of program effectiveness was found to range from low to moderate. However, empirical evidence alone is insufficient for selecting among the five programs, and contextual domains may offer the most relevant guidance by matching program features with goals of consumers, practitioners, and administrators.
Armour, Patricia A; Nguyen, Linh M; Lutman, Michelle L; Middaugh, John P
2013-01-01
Infections caused by respiratory viruses are associated with recurrent epidemics and widespread morbidity and mortality. Routine surveillance of these pathogens is necessary to determine virus activity, monitor for changes in circulating strains, and plan for public health preparedness. The Southern Nevada Health District in Las Vegas, Nevada, recruited five pediatric medical practices to serve as sentinel sites for the Pediatric Early Warning Sentinel Surveillance (PEWSS) program. Sentinel staff collected specimens throughout the year from ill children who met the influenza-like illness case definition and submitted specimens to the Southern Nevada Public Health Laboratory for molecular testing for influenza and six non-influenza viruses. Laboratory results were analyzed and reported to the medical and general communities in weekly bulletins year-round. PEWSS data were also used to establish viral respiratory seasonal baselines and in influenza vaccination campaigns. The surveillance program was evaluated using the Centers for Disease Control and Prevention's (CDC's) Updated Guidelines for Evaluating Public Health Surveillance Systems. PEWSS met three of six program usefulness criteria and seven of nine surveillance system attributes, which exceeded the CDC Guidelines evaluation criteria for a useful and complete public health surveillance program. We found that PEWSS is a useful and complete public health surveillance system that is simple, flexible, accessible, and stable.
Nguyen, Linh M.; Lutman, Michelle L.; Middaugh, John P.
2013-01-01
Objectives Infections caused by respiratory viruses are associated with recurrent epidemics and widespread morbidity and mortality. Routine surveillance of these pathogens is necessary to determine virus activity, monitor for changes in circulating strains, and plan for public health preparedness. The Southern Nevada Health District in Las Vegas, Nevada, recruited five pediatric medical practices to serve as sentinel sites for the Pediatric Early Warning Sentinel Surveillance (PEWSS) program. Methods Sentinel staff collected specimens throughout the year from ill children who met the influenza-like illness case definition and submitted specimens to the Southern Nevada Public Health Laboratory for molecular testing for influenza and six non-influenza viruses. Results Laboratory results were analyzed and reported to the medical and general communities in weekly bulletins year-round. PEWSS data were also used to establish viral respiratory seasonal baselines and in influenza vaccination campaigns. The surveillance program was evaluated using the Centers for Disease Control and Prevention's (CDC's) Updated Guidelines for Evaluating Public Health Surveillance Systems. PEWSS met three of six program usefulness criteria and seven of nine surveillance system attributes, which exceeded the CDC Guidelines evaluation criteria for a useful and complete public health surveillance program. Conclusion We found that PEWSS is a useful and complete public health surveillance system that is simple, flexible, accessible, and stable. PMID:23997308
DOT National Transportation Integrated Search
2005-01-01
This effort demonstrates business process modeling to describe the integration of particular planning and programming activities of a state highway agency. The motivations to document planning and programming activities are that: (i) resources for co...
44 CFR 152.4 - Roles and responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL ASSISTANCE TO FIREFIGHTERS GRANT PROGRAM § 152.4... strategic plan, and the Notice of Funds Availability. (2) We will ensure that not more than twenty-five (25...
44 CFR 152.4 - Roles and responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL ASSISTANCE TO FIREFIGHTERS GRANT PROGRAM § 152.4... strategic plan, and the Notice of Funds Availability. (2) We will ensure that not more than twenty-five (25...
44 CFR 152.4 - Roles and responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY FIRE PREVENTION AND CONTROL ASSISTANCE TO FIREFIGHTERS GRANT PROGRAM § 152.4... strategic plan, and the Notice of Funds Availability. (2) We will ensure that not more than twenty-five (25...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-06
... pilot program, which was implemented through a series of rule filings by the Exchanges and FINRA. This... as a one-year pilot program in two Phases. Phase I of the Plan would be implemented immediately...
ERIC Educational Resources Information Center
Taylor, Lori L.; Springer, Matthew G.; Ehlert, Mark
2008-01-01
This study describes the teacher pay for performance plans designed and implemented by the public schools participating in the Governor's Educator Excellence Grant (GEEG) program in Texas. GEEG is a federally funded, incentive pay program that awarded non-competitive grants, ranging from $60,000 to $220,000 each year for three years, to 99 Texas…
ERIC Educational Resources Information Center
Gao, Xing-Ya; Yu, Rong-Bin; Shen, Hong-Bing; Chen, Qi
2014-01-01
To build an effective model to train excellent doctors, Nanjing Medical University has proposed a five- plus three-year combined undergraduate-master's clinical medicine degree program. The program integrates undergraduate education, the education of research students, and standardized doctor residency training into a single system, allowing…
Graduate Business Students Perceptions of Online Learning: A Five Year Comparison
ERIC Educational Resources Information Center
Perreault, Heidi; Waldman, Lila; Alexander, Melody; Zhao, Jensen
2008-01-01
This study compared graduate business students' access to online graduate programs and their perceptions relating to online learning over a five-year period. Student input was provided during 2001 and 2006. Students in 2006 had greater access to entire graduate programs being offered online than did the 2001 students. The students in 2006 felt…
Pearls and Pitfalls in Evaluating a Student Assistance Program: A Five-Year Case Study
ERIC Educational Resources Information Center
Wilburn, Sharon T.; Wilburn, Kenneth T.; Weaver, Dax M.; Bowles, Kathy
2007-01-01
This article presents data from a five-year evaluation-research case study of a large urban schools district's internal Student Assistance Program (SAP). The district employed specially trained and licensed school-based counselors to implement an internal SAP expanded to include tertiary prevention, and modeled after an employee assistance program…
A Five-Year Follow-Up of Students Enrolled in Post-Secondary Vocational-Technical-Transfer Programs.
ERIC Educational Resources Information Center
Noeth, Richard J.; Hanson, Gary R.
The nationwide study examines career behavior patterns and work orientations of students five years after they began vocational-technical transfer programs at community colleges, technical schools, and similar kinds of institutions in the fall of 1970. The study sample consisted of 4,350 individuals selected from the national norm group who…
Aerospace Safety Advisory Panel
NASA Technical Reports Server (NTRS)
1999-01-01
This report covers the activities of the Aerospace Safety Advisory Panel (ASAP) for calendar year 1998-a year of sharp contrasts and significant successes at NASA. The year opened with the announcement of large workforce cutbacks. The slip in the schedule for launching the International Space Station (ISS) created a five-month hiatus in Space Shuttle launches. This slack period ended with the successful and highly publicized launch of the STS-95 mission. As the year closed, ISS assembly began with the successful orbiting and joining of the Functional Cargo Block (FGB), Zarya, from Russia and the Unity Node from the United States. Throughout the year, the Panel maintained its scrutiny of NASA's safety processes. Of particular interest were the potential effects on safety of workforce reductions and the continued transition of functions to the Space Flight Operations Contractor. Attention was also given to the risk management plans of the Aero-Space Technology programs, including the X-33, X-34, and X-38. Overall, the Panel concluded that safety is well served for the present. The picture is not as clear for the future. Cutbacks have limited the depth of talent available. In many cases, technical specialties are 'one deep.' The extended hiring freeze has resulted in an older workforce that will inevitably suffer significant departures from retirements in the near future. The resulting 'brain drain' could represent a future safety risk unless appropriate succession planning is started expeditiously. This and other topics are covered in the section addressing workforce. The major NASA programs are also limited in their ability to plan property for the future. This is of particular concern for the Space Shuttle and ISS because these programs are scheduled to operate well into the next century. In the case of the Space Shuttle, beneficial and mandatory safety and operational upgrades are being delayed because of a lack of sufficient present funding. Likewise, the ISS has little flexibility to begin long lead-time items for upgrades or contingency planning. For example, the section on computer hardware and software contains specific findings related to required longer range safety-related actions. NASA can be proud of its accomplishments this past year, but must remain ever vigilant, particularly as ISS assembly begins to accelerate. The Panel will continue to focus on both the short- and long-term aspects of risk management and safety planning. This task continues to be made manageable and productive by the excellent cooperation the Panel receives from both NASA and its contractors. Particular emphasis will continue to be directed to longer term workforce and program planning issues as well as the immediate risks associated with ISS assembly and the initial flights of the X-33 and X-34. Section 2 of this report presents specific findings and recommendations generated by ASAP activities during 1998. Section 3 contains more detailed information in support of these findings and recommendations. Appendix A is a current roster of Panel members, consultants, and staff. Appendix B contains NASA's response to the findings and recommendations from the 1997 ASAP Annual Report. Appendix C details the fact-finding activities of the Panel in 1998. During the year, Mr. Richard D. Blomberg was elected chair of the Panel and Vice Admiral (VADM) Robert F Dunn was elected deputy chair. VADM Bernard M. Kauderer moved from consultant to member. Mr. Charles J. Donlan retired from the Panel after many years of meritorious service. Ms. Shirley C. McCarty and Mr. Robert L. ('Hoot') Gibson joined the Panel as consultants.
An impact evaluation of Plan Indonesia's early childhood program.
Aboud, Frances E; Proulx, Kerrie; Asrilla, Zaitu
2016-12-27
High-quality preschools are known to prepare children for success in primary school. Over half of Indonesia's children now pass through preschools whose quality and effectiveness are unknown. Our goal was to evaluate two government preschool models, namely kindergarten (TK) and the less formal health-post (PAUD), with and without capacity-building efforts of a non-governmental organization (NGO-Plan), on children's language and math skills. Thirteen TK and 17 PAUD Plan-supported and the same number of government-supported preschools were randomly selected from East Nusa Tenggara, Indonesia. Five children from each (n = 292) and five who had graduated from each and were now in first grade (n = 241) were randomly selected and tested on language and math measures. The Plan-supported preschools were assessed for quality. Mothers reported on their family's socio-demographic situation and their child's preventive health practices, illnesses and diet over the previous two weeks. Analyses of covariance adjusting for clusters indicated that children attending Plan-supported preschools performed better overall, and especially those in TK preschools. Plan-supported TKs were observed to have higher quality than Plan-supported PAUDs. First graders who graduated from Plan-supported preschools, both TK and PAUD, achieved higher scores on language and math tests than government-supported graduates. Preventive health practices were better in the Plan group, though diet and height-for-age were poor overall. Upgrades to the government preschool program are needed to raise its quality and effectiveness, specifically by introducing a mix of instructional and indoor free-choice play, resources and teacher training to support children's learning.
Kansas State Plan for Career Education. Final Report. F.Y. 1978, July 1, 1977--September 30, 1978.
ERIC Educational Resources Information Center
InterAmerica Research Associates, Lawrence, KS.
A two-year project was undertaken in Kansas to develop a five-year plan for career education in the state. The first year resulted in (1) a brief summary of previous work done in Kansas since the introduction of the career education concept, (2) establishment of a definition of career education, (3) a description of various resources that can be…
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
NASA Astrophysics Data System (ADS)
Fish, Philip E.
1995-05-01
In 1978, Wisconsin Department of Transportation discovered major cracking on a two-girder, fracture critical structure, just four years after it was constructed. In 1981, on the same structure, now seven years old, major cracking was discovered in the tie girder flange of the tied arch span. This is one example of the type of failures that transportation departments discovered on welded structures in the 1970's and '80's. The failures from welded details and pinned connections lead to much stricter standards for present day designs. All areas were affected: design with identification of fatigue-prone details and classification of fatigue categories; material requirements with emphasis on toughness and weldability; increased welding and fabrication standards with licensure of fabrication shops to minimum quality standards including personnel; and an increased effort on inspection of existing bridges, where critical details were overlooked or missed in the past. FHWA inspection requirements for existing structures increased through this same time period, in reaction to the failures that had occurred. Obviously, many structures in Wisconsin were not built to the standards now required, thus the importance for quality inspection techniques. The new FHWA inspection requirements now being implemented throughout the nation require an in-depth, hands-on type inspection at a specified frequency, on all fracture critical structures. Wisconsin Department of Transportation started an in-depth inspection program in 1985 and made it a full time program in 1987. This program included extensive nondestructive testing. Ultrasonic inspection has played a major role in this type of inspection. All fracture critical structures, pin and hanger systems, and pinned connections are inspected on a five-year cycle now. The program requires an experienced inspection team and a practical inspection approach. Extensive preparation is required with review of all design, construction, and maintenance documents. An inspection plan is developed from the review and downloaded to a laptop computer. Inspection emphasis are on 'hands on' visual and nondestructive evaluation. Report documentation includes all design plans, pictorial documentation of structural deficiencies, nondestructive evaluation reports, conclusions, and recommendations. Planned changes in the program include implementation of an engineering work station as a 'single source' information file and reporting file for the inspection program. This would include scanning all current information into the file such as design, construction, and maintenance history. It would also include all inspection data with pictures. Inspections would be performed by downloading data onto a laptop and then uploading after completion of inspection. Pictures and nondestructive data would be entered by digital disks.
Environmental Hazards Assessment Program annual report, [June 1992--June 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
This report, the Environment Hazards Assessment Program (EHAP) Annual Report, is the second of three reports that document activities under the EHAP grant and details progress made during the first year of the grant. The first year was devoted to the development of a working program implementation plan. During the developmental process some key objectives were achieved such as developing a Doctor of Philosophy degree program in Environmental Studies at MUSC (Medical University of South Carolina) and conducting the first Crossroads of Humanity series Round Table Forum. The PIP (Program Implementation Program) details the objectives, management and budgetary basis formore » the overall management and control of the grant over the next four years, the yearly program plans provide the monthly and day-to-day programmatic and budgetary control by which the PIP was developed.« less
32 CFR 37.420 - Should I tell proposers that we will not disclose information that they submit?
Code of Federal Regulations, 2010 CFR
2010-07-01
... documents; and (ii) Business plans and technical information submitted on a confidential basis. (c) If proposers desire to protect business plans and technical information for five years from FOIA disclosure...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1976-06-01
Oil shale technology has been divided into two sub-technologies: surfaceprocessing and in-situ processing. Definition of the research programs is essentially an amplification of the five King-Muir categories: (A) pollutants: characterization, measurement, and monitoring; (B) physical and chemical processes and effects; (C) health effects; (D) ecological processes and effects; and (E) integrated assessment. Twenty-three biomedical and environmental research projects are described as to program title, scope, milestones, technology time frame, program unit priority, and estimated program unit cost.
Medical Lasers At The Crossroads: Directions For The Next Five Years
NASA Astrophysics Data System (ADS)
Brauer, Fritz A.
1988-09-01
Of course, much can be attributed to our relative youth - the sheer number and scope of the opportunities have distorted focus and strained resources. However, I believe that we have reached a point - a crossroads - where the topography is more clearly defined and where some discernible trends point to the direction this industry will take over the next five years. These will be important years - investors, especially, expect signs of maturity to replace unbounded youthful optimism. How many of us can look back on the business plans we wrote five years ago and not feel chastened (or depressed). Our excuse is that we got everything right except the timing. Well, the "timing" is the next five years! So my talk today will center upon my personal view of these next five years. I wish to emphasize the personal aspect of my discussion: this is my prescription for future happiness.
A concept for performance management for Federal science programs
Whalen, Kevin G.
2017-11-06
The demonstration of clear linkages between planning, funding, outcomes, and performance management has created unique challenges for U.S. Federal science programs. An approach is presented here that characterizes science program strategic objectives by one of five “activity types”: (1) knowledge discovery, (2) knowledge development and delivery, (3) science support, (4) inventory and monitoring, and (5) knowledge synthesis and assessment. The activity types relate to performance measurement tools for tracking outcomes of research funded under the objective. The result is a multi-time scale, integrated performance measure that tracks individual performance metrics synthetically while also measuring progress toward long-term outcomes. Tracking performance on individual metrics provides explicit linkages to root causes of potentially suboptimal performance and captures both internal and external program drivers, such as customer relations and science support for managers. Functionally connecting strategic planning objectives with performance measurement tools is a practical approach for publicly funded science agencies that links planning, outcomes, and performance management—an enterprise that has created unique challenges for public-sector research and development programs.
Problems of ergonomics in Bali, Indonesia.
Manuaba, A
1976-12-01
Development in Indonesia, particularly in Bali, has been planned and done through several stages of the Five-Year Development Programs, which started in 1969, and emphasized intensification of agriculture and extensification of industries related to potential resources available in the region. In the process, industrialization, being regarded as a prerequisite to higher living standards, brought with it problems concerning safety, health, and work conditions, especially with respect to transfer of technology. As examples, experiences and data, related particularly to ergonomics in the sectors of agriculture, hotel business, textile mills, transportation, and others in Bali, Indonesia, are reported. In dealing with such possible consequences of development, efforts to find fundamental solutions should be given the highest priority. It is necessary to make use of all the existing institutions having potential functions and roles in the policy of development planning, and to take into consideration the factors of safety, health, and work conditions in specifying technical and financial development projects for industrialization.