Sample records for fixed base station

  1. 47 CFR 90.1307 - Licensing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... licenses will serve as a prerequisite for registering individual fixed and base stations. A licensee cannot operate a fixed or base station before registering it under its license and licensees must delete registrations for unused fixed and base stations. ...

  2. 47 CFR 90.213 - Frequency stability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... range (MHz) Fixed and base stations Mobile stations Over 2 watts output power 2 watts or less output...-930 1.5 935-940 0.1 1.5 1.5 1427-1435 9 300 300 300 Above 2450 10 1 Fixed and base stations with over... stability of 5 ppm. 5 In the 150-174 MHz band, fixed and base stations with a 12.5 kHz channel bandwidth...

  3. 47 CFR 90.419 - Points of communication.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... communicate between associated mobile stations and associated base stations of the licensee. Accordingly, operations between base stations at fixed locations are permitted only in the following situations: (a) Base... frequencies below 450 MHz, may communicate on a secondary basis with other base stations, operational fixed...

  4. 47 CFR 90.745 - Phase I licensee service areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be defined by the predicted 38 dBu service contour of its authorized base station or fixed station... its license to relocate its initially authorized base station. The Phase I licensee's predicted 38 dBu...'s base station or fixed station. Phase I licensees are permitted to add, remove, or modify...

  5. 47 CFR 24.5 - Terms and definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in the National Geodetic Survey (NGS) data base. (Source: National Geodetic Survey, U.S. Department... antenna site. Base Station. A land station in the land mobile service. Broadband PCS. PCS services.... Fixed Station. A station in the fixed service. Land Mobile Service. A mobile service between base...

  6. 47 CFR 24.5 - Terms and definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in the National Geodetic Survey (NGS) data base. (Source: National Geodetic Survey, U.S. Department... antenna site. Base Station. A land station in the land mobile service. Broadband PCS. PCS services.... Fixed Station. A station in the fixed service. Land Mobile Service. A mobile service between base...

  7. 47 CFR 24.5 - Terms and definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... in the National Geodetic Survey (NGS) data base. (Source: National Geodetic Survey, U.S. Department... antenna site. Base Station. A land station in the land mobile service. Broadband PCS. PCS services.... Fixed Station. A station in the fixed service. Land Mobile Service. A mobile service between base...

  8. 47 CFR 24.5 - Terms and definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... in the National Geodetic Survey (NGS) data base. (Source: National Geodetic Survey, U.S. Department... antenna site. Base Station. A land station in the land mobile service. Broadband PCS. PCS services.... Fixed Station. A station in the fixed service. Land Mobile Service. A mobile service between base...

  9. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... systems involving fixed systems whose base stations are controlled by such systems may automatically access these base stations through the microwave or operational fixed systems from positions in the PSTN, so long as the base stations and mobile units meet the requirements of § 90.483 and if a separate...

  10. 47 CFR 90.7 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... A regularly interacting group of base, mobile and associated control and fixed relay stations... qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are used to control...

  11. 47 CFR 90.7 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... A regularly interacting group of base, mobile and associated control and fixed relay stations... qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are used to control...

  12. 47 CFR 90.7 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...

  13. 47 CFR 90.7 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...

  14. 47 CFR 90.7 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... interacting group of base, mobile and associated control and fixed relay stations intended to provide land... one that does not qualify as unrestricted. Control point. Any place from which a transmitter's functions may be controlled. Control station. An Operational Fixed Station, the transmissions of which are...

  15. 47 CFR 27.19 - Requirements for operation of base and fixed stations in the 600 MHz downlink band in close...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... stations in the 600 MHz downlink band in close proximity to Radio Astronomy Observatories. 27.19 Section 27... base and fixed stations in the 600 MHz downlink band in close proximity to Radio Astronomy Observatories. (a) Licensees must make reasonable efforts to protect the radio astronomy observatory at Green...

  16. 47 CFR 27.70 - Information exchange.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS... activated or an existing base or fixed station is modified: (1) Location; (2) Effective radiated power; (3... identify the source if interference is encountered when the base or fixed station is activated. [72 FR...

  17. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the Fixed-Satellite Service in the 3...

  18. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., Part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the Fixed-Satellite Service in the 3...

  19. 47 CFR 25.256 - Special Requirements for operations in the 3.65-3.7 GHz band.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., Part 90 that seeks to place base and fixed stations in operation within 150 km of a primary earth station, licensees of earth stations operating on a primary basis in the fixed satellite service in the 3...

  20. 47 CFR 95.29 - Channels available.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES General Mobile Radio Service (GMRS) § 95.29 Channels available. (a) For a base station, fixed station, mobile station, or repeater station (a GMRS station that simultaneously retransmits the... non-individual, a mobile station or a small base station operating in the simplex mode may transmit on...

  1. 47 CFR 90.767 - Construction and implementation of EA and Regional licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) An EA or Regional licensee must construct a sufficient number of base stations (i.e., base stations... all of their base stations or fixed stations. [69 FR 75172, Dec. 15, 2004] ... constructed stations. (d) EA and Regional licensees will not be permitted to count the resale of the services...

  2. 47 CFR 90.769 - Construction and implementation of Phase II nationwide licenses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (a) A nationwide licensee must construct a sufficient number of base stations (i.e., base stations... their authorized channels at all of their base stations or fixed stations. [69 FR 75173, Dec. 15, 2004] ... will not be converted to individual, site-by-site authorizations for already constructed stations. (d...

  3. 47 CFR 90.733 - Permissible operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... benchmark for the construction of its land mobile system base stations as prescribed in § 90.725(a); and (2... first meet the requirement to construct its land mobile base station and place it in operation, or... chapter. (f) A Phase I non-nationwide licensee operating a paging base station, or a fixed station...

  4. New Beamlines For Protein Crystallography At The EMBL-Outstation Hamburg

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hermes, C.; Gehrmann, T.; Jahn, D.

    2004-05-12

    Three new beamlines for Protein Crystallography were built up on a bending magnet fan of the DORIS III storage ring. A 10 mrad wide fan of white Synchrotron Radiation (SR) is evenly distributed among 3 individual stations: X12, a central, wavelength-tunable station intended for anomalous scattering experiments (MAD) and fixed wavelength, high intensity stations symmetrically on either side. The fixed wavelength beamlines X11 and X13 comprise triangular, asymmetrically cut Si (111) monochromators as horizontally focusing optical elements. The tunable station is based on a fixed-exit, horizontally focusing double crystal monochromator system. Vertical focusing is achieved on all three lines bymore » trapezoidal shaped, continuous Rh-coated mirrors which can be dynamically bent. In all three lines the X-ray beam can be examined at various points on its way through the optical system by removable screens and PIN-diode based intensity monitors. Purpose built crystallographic end-stations complete the set-up. The design of individual components and their performance will be described.« less

  5. 47 CFR 90.119 - Application requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...

  6. 47 CFR 90.119 - Application requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...

  7. 47 CFR 90.119 - Application requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...

  8. 47 CFR 90.119 - Application requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... frequency, the station class, the total number of control stations, the emission, and the output power of... Services, including applications for new base, fixed, or mobile station authorizations governed by this part. (b) If the control station(s) will operate on the same frequency as the mobile station, and if...

  9. STS-29 Commander Coats in JSC fixed base (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    STS-29 Discovery, Orbiter Vehicle (OV) 103, Commander Michael L. Coats sits at commanders station forward flight deck controls in JSC fixed base (FB) shuttle mission simulator (SMS). Coats, wearing communications kit assembly headset and flight coveralls, looks away from forward control panels to aft flight deck. Pilots station seat back appears in foreground. FB-SMS is located in JSC Mission Simulation and Training Facility Bldg 5.

  10. Adaptive control applied to Space Station attitude control system

    NASA Technical Reports Server (NTRS)

    Lam, Quang M.; Chipman, Richard; Hu, Tsay-Hsin G.; Holmes, Eric B.; Sunkel, John

    1992-01-01

    This paper presents an adaptive control approach to enhance the performance of current attitude control system used by the Space Station Freedom. The proposed control law was developed based on the direct adaptive control or model reference adaptive control scheme. Performance comparisons, subject to inertia variation, of the adaptive controller and the fixed-gain linear quadratic regulator currently implemented for the Space Station are conducted. Both the fixed-gain and the adaptive gain controllers are able to maintain the Station stability for inertia variations of up to 35 percent. However, when a 50 percent inertia variation is applied to the Station, only the adaptive controller is able to maintain the Station attitude.

  11. Mojave Base Station Implementation

    NASA Technical Reports Server (NTRS)

    Koscielski, C. G.

    1984-01-01

    A 12.2 meter diameter X-Y mount antenna was reconditioned for use by the crustal dynamic project as a fixed base station. System capabilities and characteristics and key performance parameters for subsystems are presented. The implementation is completed.

  12. 47 CFR 1.907 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requests to assign rights granted by the authorization or to transfer control of entities holding... in the station's authorization or rules. Control station. A fixed station, the transmissions of which are used to control automatically the emissions or operations of a radio station, or a remote base...

  13. 47 CFR 90.476 - Interconnection of fixed stations and certain mobile stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... mobile stations. 90.476 Section 90.476 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Transmitter Control Interconnected Systems § 90.476 Interconnection of fixed stations and certain mobile stations. (a) Fixed stations and...

  14. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  15. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  16. 47 CFR 25.140 - Qualifications of fixed-satellite space station licensees.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Qualifications of fixed-satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of fixed-satellite space station licensees. (a) New fixed-satellites shall comply with the...

  17. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  18. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  19. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  20. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  1. 47 CFR 25.277 - Temporary fixed earth station operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Temporary fixed earth station operations. 25... SERVICES SATELLITE COMMUNICATIONS Technical Operations § 25.277 Temporary fixed earth station operations. (a) When an earth station in the Fixed-Satellite Service is to remain at a single location for fewer...

  2. 47 CFR 25.140 - Qualifications of Fixed-Satellite space station licensees.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Qualifications of Fixed-Satellite space station... CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Space Stations § 25.140 Qualifications of Fixed-Satellite space station licensees. (a) [Reserved] (b) Each applicant for a space station...

  3. 47 CFR 90.763 - EA, Regional and nationwide system operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... authorized pursuant to § 90.761 may construct and operate any number of land mobile or paging base stations... authorized pursuant to § 90.717(a) may construct and operate any number of land mobile or paging base stations, or fixed stations, anywhere in the Nation, and transmit on any of its authorized channels...

  4. 47 CFR 90.763 - EA, Regional and nationwide system operations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... authorized pursuant to § 90.761 may construct and operate any number of land mobile or paging base stations... authorized pursuant to § 90.717(a) may construct and operate any number of land mobile or paging base stations, or fixed stations, anywhere in the Nation, and transmit on any of its authorized channels...

  5. 47 CFR 90.763 - EA, Regional and nationwide system operations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... authorized pursuant to § 90.761 may construct and operate any number of land mobile or paging base stations... authorized pursuant to § 90.717(a) may construct and operate any number of land mobile or paging base stations, or fixed stations, anywhere in the Nation, and transmit on any of its authorized channels...

  6. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  7. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  8. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  9. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  10. 47 CFR 90.1331 - Restrictions on the operation of base and fixed stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... any grandfathered satellite earth station operating in the 3650-3700 MHz band. The coordinates of... located within 150 km of a grandfathered satellite earth station provided that the licensee of the satellite earth station and the 3650-3700 MHz licensee mutually agree on such operation. (3) Any...

  11. Shuttle mission simulator baseline definition report, volume 2

    NASA Technical Reports Server (NTRS)

    Dahlberg, A. W.; Small, D. E.

    1973-01-01

    The baseline definition report for the space shuttle mission simulator is presented. The subjects discussed are: (1) the general configurations, (2) motion base crew station, (3) instructor operator station complex, (4) display devices, (5) electromagnetic compatibility, (6) external interface equipment, (7) data conversion equipment, (8) fixed base crew station equipment, and (9) computer complex. Block diagrams of the supporting subsystems are provided.

  12. Airborne and Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report (SAR) RCS: DD-A&T(Q&A)823-421 Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) As of FY 2017...Information Program Name Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) DoD Component Army Responsible Office References SAR...UNCLASSIFIED 5 Mission and Description Airborne & Maritime/Fixed Station Joint Tactical Radio System (AMF JTRS) products are software programmable

  13. 47 CFR 25.140 - Further requirements for license applications for geostationary space stations in the Fixed...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for geostationary space stations in the Fixed-Satellite Service and the 17/24 GHz Broadcasting... Further requirements for license applications for geostationary space stations in the Fixed-Satellite... § 25.114, applicants for geostationary-orbit FSS space stations must provide an interference analysis...

  14. 78 FR 21555 - Signal Booster Rules

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... needed, such as when the device approaches the base station with which it is communicating; (5) be..., the signals received from base, fixed, mobile, or portable stations, with no change in frequency or... oscillations in uplink and downlink bands (such as may result from insufficient isolation between the antennas...

  15. Free-Suspension Residual Flexibility Testing of Space Station Pathfinder: Comparison to Fixed-Base Results

    NASA Technical Reports Server (NTRS)

    Tinker, Michael L.

    1998-01-01

    Application of the free-suspension residual flexibility modal test method to the International Space Station Pathfinder structure is described. The Pathfinder, a large structure of the general size and weight of Space Station module elements, was also tested in a large fixed-base fixture to simulate Shuttle Orbiter payload constraints. After correlation of the Pathfinder finite element model to residual flexibility test data, the model was coupled to a fixture model, and constrained modes and frequencies were compared to fixed-base test. modes. The residual flexibility model compared very favorably to results of the fixed-base test. This is the first known direct comparison of free-suspension residual flexibility and fixed-base test results for a large structure. The model correlation approach used by the author for residual flexibility data is presented. Frequency response functions (FRF) for the regions of the structure that interface with the environment (a test fixture or another structure) are shown to be the primary tools for model correlation that distinguish or characterize the residual flexibility approach. A number of critical issues related to use of the structure interface FRF for correlating the model are then identified and discussed, including (1) the requirement of prominent stiffness lines, (2) overcoming problems with measurement noise which makes the antiresonances or minima in the functions difficult to identify, and (3) the use of interface stiffness and lumped mass perturbations to bring the analytical responses into agreement with test data. It is shown that good comparison of analytical-to-experimental FRF is the key to obtaining good agreement of the residual flexibility values.

  16. Information transmission on hybrid networks

    NASA Astrophysics Data System (ADS)

    Chen, Rongbin; Cui, Wei; Pu, Cunlai; Li, Jie; Ji, Bo; Gakis, Konstantinos; Pardalos, Panos M.

    2018-01-01

    Many real-world communication networks often have hybrid nature with both fixed nodes and moving modes, such as the mobile phone networks mainly composed of fixed base stations and mobile phones. In this paper, we discuss the information transmission process on the hybrid networks with both fixed and mobile nodes. The fixed nodes (base stations) are connected as a spatial lattice on the plane forming the information-carrying backbone, while the mobile nodes (users), which are the sources and destinations of information packets, connect to their current nearest fixed nodes respectively to deliver and receive information packets. We observe the phase transition of traffic load in the hybrid network when the packet generation rate goes from below and then above a critical value, which measures the network capacity of packets delivery. We obtain the optimal speed of moving nodes leading to the maximum network capacity. We further improve the network capacity by rewiring the fixed nodes and by considering the current load of fixed nodes during packets transmission. Our purpose is to optimize the network capacity of hybrid networks from the perspective of network science, and provide some insights for the construction of future communication infrastructures.

  17. 47 CFR 27.303 - Upper 700 MHz commercial and public safety coordination zone.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operators are required, prior to commencing operations on fixed or base station transmitters on the 776-787 MHz and 788-793 MHz bands that are located within 500 meters of existing or planned public safety base... license. Public safety base stations are considered “planned” when public safety operators have notified...

  18. 47 CFR 90.137 - Applications for operation at temporary locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... evidence of frequency coordination. (b) When any unit or units of a base station or fixed station which are... Applications for operation at temporary locations. (a) An application for authority to operate a base or a... the following: (1) When one or more individual transmitters are to be operated by a licensee as a base...

  19. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  20. 47 CFR 101.5 - Station authorization required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...

  1. 47 CFR 101.5 - Station authorization required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...

  2. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  3. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  4. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  5. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  6. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  7. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  8. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  9. 47 CFR 101.5 - Station authorization required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...

  10. 47 CFR 101.815 - Stations at temporary fixed locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Stations at temporary fixed locations. 101.815 Section 101.815 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.815 Stations at temporary...

  11. 47 CFR 101.137 - Interconnection of private operational fixed point-to-point microwave stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... point-to-point microwave stations. 101.137 Section 101.137 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.137 Interconnection of private operational fixed point-to-point microwave stations. Private...

  12. 47 CFR 101.5 - Station authorization required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...

  13. 47 CFR 101.5 - Station authorization required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.5 Station... stations authorized under subpart H (Private Operational Fixed Point-to-Point Microwave Service), subpart I (Common Carrier Fixed Point-to-Point Microwave Service), and subpart L of this part (Local Multipoint...

  14. STS-26 crew on fixed based (FB) shuttle mission simulator (SMS) flight deck

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck (left) and Pilot Richard O. Covey review checklists in their respective stations on the foward flight deck. The STS-26 crew is training in the fixed base (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  15. 78 FR 14952 - Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit Space Stations AGENCY... geostationary satellites in the fixed-satellite service on a primary basis. This proposed footnote would grant... licensees and operators, and thus are unable to estimate the number of geostationary space station licensees...

  16. 47 CFR 95.135 - Maximum authorized transmitting power.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... watts ERP. (d) A fixed station must transmit with no more than 15 watts output power. (e) A small base station must transmit with no more than 5 watts ERP. [48 FR 35237, Aug. 3, 1983, as amended at 53 FR 47717...

  17. A PDA-based flexible telecommunication system for telemedicine applications.

    PubMed

    Nazeran, Homer; Setty, Sunil; Haltiwanger, Emily; Gonzalez, Virgilio

    2004-01-01

    Technology has been used to deliver health care at a distance for many years. Telemedicine is a rapidly growing area and recently there are studies devoted to prehospital care of patients in emergency cases. In this work we have developed a compact, reliable, and low cost PDA-based telecommunication device for telemedicine applications to transmit audio, still images, and vital signs from a remote site to a fixed station such as a clinic or a hospital in real time. This was achieved based on a client-server architecture. A Pocket PC, a miniature camera, and a hands-free microphone were used at the client site and a desktop computer running the Windows XP operating system was used as a server. The server was located at a fixed station. The system was implemented on TCP/IP and HTTP protocol. Field tests have shown that the system can reliably transmit still images, audio, and sample vital signs from a simulated remote site to a fixed station either via a wired or wireless network in real time. The Pocket PC was used at the client site because of its compact size, low cost and processing capabilities.

  18. Understanding Aggregation and Estimating Seasonal Abundance of Chrysaora quinquecirrha Medusae from a Fixed-station Time Series in the Choptank River, Chesapeake Bay

    NASA Astrophysics Data System (ADS)

    Tay, J.; Hood, R. R.

    2016-02-01

    Although jellyfish exert strong control over marine plankton dynamics (Richardson et al. 2009, Robison et al. 2014) and negatively impact human commercial and recreational activities (Purcell et al. 2007, Purcell 2012), jellyfish biomass is not well quantified due primarily to sampling difficulties with plankton nets or fisheries trawls (Haddock 2004). As a result, some of the longest records of jellyfish are visual shore-based surveys, such as the fixed-station time series of Chrysaora quinquecirrha that began in 1960 in the Patuxent River in Chesapeake Bay, USA (Cargo and King 1990). Time series counts from fixed-station surveys capture two signals: 1) demographic change at timescales on the order of reproductive processes and 2) spatial patchiness at shorter timescales as different parcels of water move in and out of the survey area by tidal and estuarine advection and turbulent mixing (Lee and McAlice 1979). In this study, our goal was to separate these two signals using a 4-year time series of C. quinquecirrha medusa counts from a fixed-station in the Choptank River, Chesapeake Bay. Idealized modeling of tidal and estuarine advection was used to conceptualize the sampling scheme. Change point and time series analysis was used to detect demographic changes. Indices of aggregation (Negative Binomial coefficient, Taylor's Power Law coefficient, and Morisita's Index) were calculated to describe the spatial patchiness of the medusae. Abundance estimates revealed a bloom cycle that differed in duration and magnitude for each of the study years. Indices of aggregation indicated that medusae were aggregated and that patches grew in the number of individuals, and likely in size, as abundance increased. Further inference from the conceptual modeling suggested that medusae patch structure was generally homogenous over the tidal extent. This study highlights the benefits of using fixed-station shore-based surveys for understanding the biology and ecology of jellyfish.

  19. 47 CFR 95.135 - Maximum authorized transmitting power.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... transmitting power. (a) No station may transmit with more than 50 watts output power. (b) [Reserved] (c) A small control station at a point north of Line A or east of Line C must transmit with no more than 5 watts ERP. (d) A fixed station must transmit with no more than 15 watts output power. (e) A small base...

  20. Surface-water-quality assessment of the Kentucky River Basin, Kentucky; fixed-station network and selected water-quality data, April 1987 through August 1991

    USGS Publications Warehouse

    Griffin, M.S.; Martin, G.R.; White, K.D.

    1994-01-01

    This report describes selected data-collection activities and the associated data collected during the Kentucky River Basin pilot study of the U.S. Geological Survey's National Water-Quality Assessment Program. The data are intended to provide a nationally consistent description and improved understanding of current water quality in the basin. The data were collected at seven fixed stations that represent stream cross sections where constituent transport and water-quality trends can be evaluated. The report includes descriptions of (1) the basin; (2) the design of the fixed-station network; (3) the fixed-station sites; (4) the physical and chemical measurements; (5) the methods of sample collection, processing, and analysis; and (6) the quality-assurance and quality-control procedures. Water-quality data collected at the fixed stations during routine periodic sampling and supplemental high-flow sampling from April 1987 to August 1991 are presented.

  1. 47 CFR 80.701 - Scope of service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the paired duplex channels listed in subpart H of this part. Alaska-private fixed stations may operate... fixed stations or with ship stations, and on duplex frequencies listed in subpart H of this part when...

  2. Fixed Base Modal Survey of the MPCV Orion European Service Module Structural Test Article

    NASA Technical Reports Server (NTRS)

    Winkel, James P.; Akers, J. C.; Suarez, Vicente J.; Staab, Lucas D.; Napolitano, Kevin L.

    2017-01-01

    Recently, the MPCV Orion European Service Module Structural Test Article (E-STA) underwent sine vibration testing using the multi-axis shaker system at NASA GRC Plum Brook Station Mechanical Vibration Facility (MVF). An innovative approach using measured constraint shapes at the interface of E-STA to the MVF allowed high-quality fixed base modal parameters of the E-STA to be extracted, which have been used to update the E-STA finite element model (FEM), without the need for a traditional fixed base modal survey. This innovative approach provided considerable program cost and test schedule savings. This paper documents this modal survey, which includes the modal pretest analysis sensor selection, the fixed base methodology using measured constraint shapes as virtual references and measured frequency response functions, and post-survey comparison between measured and analysis fixed base modal parameters.

  3. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with ACTS. The ACTS experiments program proposed to validate Ka-band satellite and ground-station technology, demonstrate future telecommunication services, demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals and the lessons learned throughout their 6-year operation, including the inclined orbit phase-of-operations. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector-based offset-fed antenna systems with antennas ranging in size from 0.35 to 3.4 in. in diameter. Gateway earth stations included two systems referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET).

  4. 75 FR 15392 - Satellite License Procedures

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... earth station applications must be filed electronically through the International Bureau Filing System... space radio- communication service other than the Fixed Satellite Service. Fixed earth station. An earth... revisions to its satellite and earth station licensing rules. The intended purpose of this proceeding is to...

  5. STS-26 crew trains in JSC fixed-based (FB) shuttle mission simulator (SMS)

    NASA Image and Video Library

    1987-10-20

    S87-46304 (20 Oct 1987) --- Astronauts Frederick H. (Rick) Hauck, left, STS-26 commander, and Richard O. Covey, pilot, man their respective stations in the Shuttle mission simulator (fixed base) at the Johnson Space Center. A simulation for their anticipated June 1988 flight aboard the space shuttle Discovery began Oct. 20. Astronaut David C. Hilmers, one of three mission specialists for the flight, is partially visible in the foreground.

  6. 47 CFR 74.641 - Antenna systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Antenna systems. 74.641 Section 74.641... Stations § 74.641 Antenna systems. (a) For fixed stations operating above 2025 MHz, the following standards apply: (1) Fixed TV broadcast auxiliary stations shall use directional antennas that meet the...

  7. 47 CFR 74.641 - Antenna systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Antenna systems. 74.641 Section 74.641... Stations § 74.641 Antenna systems. (a) For fixed stations operating above 2025 MHz, the following standards apply: (1) Fixed TV broadcast auxiliary stations shall use directional antennas that meet the...

  8. 47 CFR 74.641 - Antenna systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Antenna systems. 74.641 Section 74.641... Stations § 74.641 Antenna systems. (a) For fixed stations operating above 2025 MHz, the following standards apply: (1) Fixed TV broadcast auxiliary stations shall use directional antennas that meet the...

  9. 47 CFR 74.641 - Antenna systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Antenna systems. 74.641 Section 74.641... Stations § 74.641 Antenna systems. (a) For fixed stations operating above 2025 MHz, the following standards apply: (1) Fixed TV broadcast auxiliary stations shall use directional antennas that meet the...

  10. 78 FR 19172 - Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 2 and 25 [IB Docket No. 12-376; FCC 12-161] Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit Space Stations AGENCY: Federal Communications Commission. ACTION: Proposed rule; correction. SUMMARY: The Federal...

  11. Estimates of Environmental Exposure to Radiofrequency Electromagnetic Fields and Risk of Lymphoma Subtypes.

    PubMed

    Satta, G; Mascia, N; Serra, T; Salis, A; Saba, L; Sanna, S; Zucca, M G; Angelucci, E; Gabbas, A; Culurgioni, F; Pili, P; Mura, E; Cappai, M; Ennas, M G; Cocco, P

    2018-05-01

    We investigated the association between environmental exposure to radiofrequency electromagnetic fields (RF-EMF) and risk of lymphoma subtypes in a case-control study comprised of 322 patients and 444 individuals serving as controls in Sardinia, Italy in 1998-2004. Questionnaire information included the self-reported distance of the three longest held residential addresses from fixed radio-television transmitters and mobile phone base stations. We georeferenced the residential addresses of all study subjects and obtained the spatial coordinates of mobile phone base stations. For each address within a 500-meter radius from a mobile phone base station, we estimated the RF-EMF intensity using predictions from spatial models, and we performed RF-EMF measurements at the door in the subset of the longest held addresses within a 250-meter radius. We calculated risk of lymphoma and its major subtypes associated with the RF-EMF exposure metrics with unconditional logistic regression, adjusting by age, gender and years of education. In the analysis of self-reported data, risk associated with residence in proximity (within 50 meters) to fixed radio-television transmitters was likewise elevated for lymphoma overall [odds ratio = 2.7, 95% confidence interval = 1.5-4.6], and for the major lymphoma subtypes. With reference to mobile phone base stations, we did not observe an association with either the self-reported, or the geocoded distance from mobile phone base stations. RF-EMF measurements did not vary by case-control status. By comparing the self-reports to the geocoded data, we discovered that the cases tended to underestimate the distance from mobile phone base stations differentially from the controls ( P = 0.073). The interpretation of our findings is compromised by the limited study size, particularly in the analysis of the individual lymphoma subtypes, and the unavailability of the spatial coordinates of radio-television transmitters. Nonetheless, our results do not support the hypothesis of a link between environmental exposure to RF-EMF from mobile phone base stations and risk of lymphoma subtypes.

  12. STS-26 crew trains in JSC fixed-based (FB) shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1987-01-01

    STS-26 Discovery, Orbiter Vehicle (OV) 103, Commander Frederick H. Hauck (left) and Pilot Richard O. Covey train in JSC fixed-based (FB) shuttle mission simulator (SMS) located in the Mission Simulation and Training Facility Bldg 5. On FB-SMS flight deck, Hauck and Covey man their respective stations. Mission Specialist (MS) David C. Hilmers is partially visible in the foreground. A simulation for their anticipated June 1988 flight began 10-20-87.

  13. 47 CFR 101.209 - Operation of stations at temporary fixed locations for communication between the United States...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Operation of stations at temporary fixed locations for communication between the United States and Canada or Mexico. 101.209 Section 101.209 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...

  14. 47 CFR 101.209 - Operation of stations at temporary fixed locations for communication between the United States...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Operation of stations at temporary fixed locations for communication between the United States and Canada or Mexico. 101.209 Section 101.209 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...

  15. 47 CFR 101.209 - Operation of stations at temporary fixed locations for communication between the United States...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Operation of stations at temporary fixed locations for communication between the United States and Canada or Mexico. 101.209 Section 101.209 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...

  16. 47 CFR 101.209 - Operation of stations at temporary fixed locations for communication between the United States...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Operation of stations at temporary fixed locations for communication between the United States and Canada or Mexico. 101.209 Section 101.209 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...

  17. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... Assignments or transfers (all services) Corres & 159 1,015.00 CUT 3. Fixed Satellite Transmit/Receive Earth... 175.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6... Only Earth Stations: a. Initial Applications for Registration or License (per station) 312 Main...

  18. STS-37 crewmembers train in JSC's FB shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-37 Commander Steven R. Nagel (left) and Mission Specialist (MS) Jerry L. Ross rehearse some of their scheduled duties on the flight deck of JSC's fixed-based (FB) shuttle mission simulator (SMS) located in the Mission Simulation and Training Facility Bldg 5. During the unsuited simulation, Nagel reviews checklist while seated at the commanders station as Ross looks on from the pilots station.

  19. 47 CFR 22.1031 - Temporary fixed stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....1031 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1031 Temporary fixed stations. The FCC may, upon... days before the end of the six month period. (b) International communications. Communications between...

  20. 47 CFR 101.705 - Special showing for renewal of common carrier station facilities using frequency diversity.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Common Carrier Fixed Point-to-Point Microwave Service § 101.705 Special showing for renewal of common carrier station...

  1. 47 CFR 101.705 - Special showing for renewal of common carrier station facilities using frequency diversity.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Common Carrier Fixed Point-to-Point Microwave Service § 101.705 Special showing for renewal of common carrier station...

  2. 47 CFR 101.705 - Special showing for renewal of common carrier station facilities using frequency diversity.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Common Carrier Fixed Point-to-Point Microwave Service § 101.705 Special showing for renewal of common carrier station...

  3. 47 CFR 101.705 - Special showing for renewal of common carrier station facilities using frequency diversity.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Common Carrier Fixed Point-to-Point Microwave Service § 101.705 Special showing for renewal of common carrier station...

  4. Updated population metadata for United States historical climatology network stations

    USGS Publications Warehouse

    Owen, T.W.; Gallo, K.P.

    2000-01-01

    The United States Historical Climatology Network (HCN) serial temperature dataset is comprised of 1221 high-quality, long-term climate observing stations. The HCN dataset is available in several versions, one of which includes population-based temperature modifications to adjust urban temperatures for the "heat-island" effect. Unfortunately, the decennial population metadata file is not complete as missing values are present for 17.6% of the 12 210 population values associated with the 1221 individual stations during the 1900-90 interval. Retrospective grid-based populations. Within a fixed distance of an HCN station, were estimated through the use of a gridded population density dataset and historically available U.S. Census county data. The grid-based populations for the HCN stations provide values derived from a consistent methodology compared to the current HCN populations that can vary as definitions of the area associated with a city change over time. The use of grid-based populations may minimally be appropriate to augment populations for HCN climate stations that lack any population data, and are recommended when consistent and complete population data are required. The recommended urban temperature adjustments based on the HCN and grid-based methods of estimating station population can be significantly different for individual stations within the HCN dataset.

  5. Electromagnetic Fields and Public Health: Mobile Phones

    MedlinePlus

    ... Ebola virus disease » Home / News / Fact sheets / Detail Electromagnetic fields and public health: mobile phones 8 October ... fixed antennas called base stations. Radiofrequency waves are electromagnetic fields, and unlike ionizing radiation such as X- ...

  6. 47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...

  7. 47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...

  8. 47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...

  9. 47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...

  10. 47 CFR 101.135 - Shared use of radio stations and the offering of private carrier service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101... Operational Fixed Point-to-Point Microwave radio stations may share the use of their facilities on a non...

  11. Free-free and fixed base modal survey tests of the Space Station Common Module Prototype

    NASA Technical Reports Server (NTRS)

    Driskill, T. C.; Anderson, J. B.; Coleman, A. D.

    1992-01-01

    This paper describes the testing aspects and the problems encountered during the free-free and fixed base modal surveys completed on the original Space Station Common Module Prototype (CMP). The CMP is a 40-ft long by 14.5-ft diameter 'waffle-grid' cylinder built by the Boeing Company and housed at the Marshall Space Flight Center (MSFC) near Huntsville, AL. The CMP modal survey tests were conducted at MSFC by the Dynamics Test Branch. The free-free modal survey tests (June '90 to Sept. '90) included interface verification tests (IFVT), often referred to as impedance measurements, mass-additive testing and linearity studies. The fixed base modal survey tests (Feb. '91 to April '91), including linearity studies, were conducted in a fixture designed to constrain the CMP in 7 total degrees-of-freedom at five trunnion interfaces (two primary, two secondary, and the keel). The fixture also incorporated an airbag off-load system designed to alleviate the non-linear effects of friction in the primary and secondary trunnion interfaces. Numerous test configurations were performed with the objective of providing a modal data base for evaluating the various testing methodologies to verify dynamic finite element models used for input to coupled load analysis.

  12. 47 CFR 74.501 - Classes of aural broadcast auxiliary stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... their co-owned FM booster stations, between noncommercial educational FM radio stations and their co... microwave booster station. A fixed station in the broadcast auxiliary service that receives and amplifies...

  13. 47 CFR 74.501 - Classes of aural broadcast auxiliary stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... their co-owned FM booster stations, between noncommercial educational FM radio stations and their co... microwave booster station. A fixed station in the broadcast auxiliary service that receives and amplifies...

  14. 47 CFR 74.501 - Classes of aural broadcast auxiliary stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... their co-owned FM booster stations, between noncommercial educational FM radio stations and their co... microwave booster station. A fixed station in the broadcast auxiliary service that receives and amplifies...

  15. 47 CFR 74.501 - Classes of aural broadcast auxiliary stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... their co-owned FM booster stations, between noncommercial educational FM radio stations and their co... microwave booster station. A fixed station in the broadcast auxiliary service that receives and amplifies...

  16. A demonstration of an independent-station radio interferometry system with 4-cm precision on a 16-km base line. [for geodesy

    NASA Technical Reports Server (NTRS)

    Thomas, J. B.; Fanselow, J. L.; Macdoran, P. F.; Skjerve, L. J.; Spitzmesser, D. J.; Fliegel, H. F.

    1976-01-01

    Radio interferometry promises eventually to measure directly, with accuracies of a few centimeters, both whole earth motions and relative crustal motions with respect to an 'inertial' reference frame. Interferometry measurements of arbitrarily long base lines require, however, the development of new techniques for independent-station observation. In connection with the development of such techniques, a series of short base line demonstration experiments has been conducted between two antennas. The experiments were related to a program involving the design of independent-station instrumentation capable of making three-dimensional earth-fixed base line measurements with an accuracy of a few centimeters. Attention is given to the instrumentation used in the experiments, aspects of data analysis, and the experimental results.

  17. A comparison of two sampling designs for fish assemblage assessment in a large river

    USGS Publications Warehouse

    Kiraly, Ian A.; Coghlan, Stephen M.; Zydlewski, Joseph D.; Hayes, Daniel

    2014-01-01

    We compared the efficiency of stratified random and fixed-station sampling designs to characterize fish assemblages in anticipation of dam removal on the Penobscot River, the largest river in Maine. We used boat electrofishing methods in both sampling designs. Multiple 500-m transects were selected randomly and electrofished in each of nine strata within the stratified random sampling design. Within the fixed-station design, up to 11 transects (1,000 m) were electrofished, all of which had been sampled previously. In total, 88 km of shoreline were electrofished during summer and fall in 2010 and 2011, and 45,874 individuals of 34 fish species were captured. Species-accumulation and dissimilarity curve analyses indicated that all sampling effort, other than fall 2011 under the fixed-station design, provided repeatable estimates of total species richness and proportional abundances. Overall, our sampling designs were similar in precision and efficiency for sampling fish assemblages. The fixed-station design was negatively biased for estimating the abundance of species such as Common Shiner Luxilus cornutus and Fallfish Semotilus corporalis and was positively biased for estimating biomass for species such as White Sucker Catostomus commersonii and Atlantic Salmon Salmo salar. However, we found no significant differences between the designs for proportional catch and biomass per unit effort, except in fall 2011. The difference observed in fall 2011 was due to limitations on the number and location of fixed sites that could be sampled, rather than an inherent bias within the design. Given the results from sampling in the Penobscot River, application of the stratified random design is preferable to the fixed-station design due to less potential for bias caused by varying sampling effort, such as what occurred in the fall 2011 fixed-station sample or due to purposeful site selection.

  18. Path planning and Ground Control Station simulator for UAV

    NASA Astrophysics Data System (ADS)

    Ajami, A.; Balmat, J.; Gauthier, J.-P.; Maillot, T.

    In this paper we present a Universal and Interoperable Ground Control Station (UIGCS) simulator for fixed and rotary wing Unmanned Aerial Vehicles (UAVs), and all types of payloads. One of the major constraints is to operate and manage multiple legacy and future UAVs, taking into account the compliance with NATO Combined/Joint Services Operational Environment (STANAG 4586). Another purpose of the station is to assign the UAV a certain degree of autonomy, via autonomous planification/replanification strategies. The paper is organized as follows. In Section 2, we describe the non-linear models of the fixed and rotary wing UAVs that we use in the simulator. In Section 3, we describe the simulator architecture, which is based upon interacting modules programmed independently. This simulator is linked with an open source flight simulator, to simulate the video flow and the moving target in 3D. To conclude this part, we tackle briefly the problem of the Matlab/Simulink software connection (used to model the UAV's dynamic) with the simulation of the virtual environment. Section 5 deals with the control module of a flight path of the UAV. The control system is divided into four distinct hierarchical layers: flight path, navigation controller, autopilot and flight control surfaces controller. In the Section 6, we focus on the trajectory planification/replanification question for fixed wing UAV. Indeed, one of the goals of this work is to increase the autonomy of the UAV. We propose two types of algorithms, based upon 1) the methods of the tangent and 2) an original Lyapunov-type method. These algorithms allow either to join a fixed pattern or to track a moving target. Finally, Section 7 presents simulation results obtained on our simulator, concerning a rather complicated scenario of mission.

  19. 47 CFR 101.145 - Interference to geostationary-satellites.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Interference to geostationary-satellites. 101... RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.145 Interference to geostationary..., and 12.7-13.25 GHz on board geostationary-space stations in the fixed-satellite service. (a) Stations...

  20. 47 CFR 80.71 - Operating controls for stations on land.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operating controls for stations on land. 80.71... SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Station Requirements-Land Stations § 80.71 Operating controls for stations on land. Each coast station, Alaska-public fixed station...

  1. Forest fire autonomous decision system based on fuzzy logic

    NASA Astrophysics Data System (ADS)

    Lei, Z.; Lu, Jianhua

    2010-11-01

    The proposed system integrates GPS / pseudolite / IMU and thermal camera in order to autonomously process the graphs by identification, extraction, tracking of forest fire or hot spots. The airborne detection platform, the graph-based algorithms and the signal processing frame are analyzed detailed; especially the rules of the decision function are expressed in terms of fuzzy logic, which is an appropriate method to express imprecise knowledge. The membership function and weights of the rules are fixed through a supervised learning process. The perception system in this paper is based on a network of sensorial stations and central stations. The sensorial stations collect data including infrared and visual images and meteorological information. The central stations exchange data to perform distributed analysis. The experiment results show that working procedure of detection system is reasonable and can accurately output the detection alarm and the computation of infrared oscillations.

  2. 47 CFR 87.261 - Scope of service.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Aeronautical Enroute Stations, Aeronautical Fixed Stations, and Aircraft Data Link Land Test Stations Aeronautical Enroute Stations § 87.261 Scope of service. (a) Aeronautical enroute stations provide operational.... (b) Service must be provided to any aircraft station licensee who makes cooperative arrangements for...

  3. 47 CFR 74.601 - Classes of TV broadcast auxiliary stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... or other purposes as authorized in § 74.631. (d) TV translator relay station. A fixed station used... low power TV stations, unless specifically otherwise indicated. (f) TV microwave booster station. A... Television Broadcast Auxiliary Stations § 74.601 Classes of TV broadcast auxiliary stations. (a) TV pickup...

  4. 47 CFR 74.601 - Classes of TV broadcast auxiliary stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... or other purposes as authorized in § 74.631. (d) TV translator relay station. A fixed station used... low power TV stations, unless specifically otherwise indicated. (f) TV microwave booster station. A... Television Broadcast Auxiliary Stations § 74.601 Classes of TV broadcast auxiliary stations. (a) TV pickup...

  5. 47 CFR 74.601 - Classes of TV broadcast auxiliary stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... or other purposes as authorized in § 74.631. (d) TV translator relay station. A fixed station used... low power TV stations, unless specifically otherwise indicated. (f) TV microwave booster station. A... Television Broadcast Auxiliary Stations § 74.601 Classes of TV broadcast auxiliary stations. (a) TV pickup...

  6. 47 CFR 74.601 - Classes of TV broadcast auxiliary stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or other purposes as authorized in § 74.631. (d) TV translator relay station. A fixed station used... low power TV stations, unless specifically otherwise indicated. (f) TV microwave booster station. A... Television Broadcast Auxiliary Stations § 74.601 Classes of TV broadcast auxiliary stations. (a) TV pickup...

  7. STS-36 Commander Creighton and Pilot Casper on flight deck during JSC training

    NASA Technical Reports Server (NTRS)

    1989-01-01

    In their forward flight deck stations, STS-36 Commander John O. Creighton and Pilot John H. Casper discuss procedures prior to participating in JSC Fixed Based (FB) Shuttle Mission Simulator (SMS) exercises in the Shuttle Simulation and Training Facility Bldg 5. Creighton (left) sits in front of the commanders station controls and Casper (right) in front of the pilots station controls. Checklists are posted in various positions on the forward control panels as the crewmembers prepare for the FB-SMS simulation and their Department of Defense (DOD) flight aboard Atlantis, Orbiter Vehicle (OV) 104.

  8. 47 CFR 5.61 - Procedure for obtaining a special temporary authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Office of Engineering and Technology Web site https://gullfoss2.fcc.gov/prod/oet/cf/els/index.cfm effective January 1, 2004 and shall contain the following information: (1) Name, address, phone number (also... proposed operation. (5) Class(es) of station (fixed, mobile, fixed and mobile) and call sign of station (if...

  9. 47 CFR 101.705 - Special showing for renewal of common carrier station facilities using frequency diversity.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Special showing for renewal of common carrier... COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Common Carrier Fixed Point-to-Point Microwave Service § 101.705 Special showing for renewal of common carrier station...

  10. 47 CFR 101.209 - Operation of stations at temporary fixed locations for communication between the United States...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... locations for communication between the United States and Canada or Mexico. 101.209 Section 101.209... communication between the United States and Canada or Mexico. Stations authorized to operate at temporary fixed... Mexico, without prior specific notification to, and authorization from, the Commission. Notification of...

  11. 47 CFR 90.119 - Application requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MOBILE RADIO SERVICES Applications and Authorizations § 90.119 Application requirements. (a) Part 1... Services, including applications for new base, fixed, or mobile station authorizations governed by this... 47 Telecommunication 5 2010-10-01 2010-10-01 false Application requirements. 90.119 Section 90.119...

  12. 47 CFR 90.425 - Station identification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... fixed wayside station. If none of these forms is practicable, any similar name or number may be... 47 Telecommunication 5 2012-10-01 2012-10-01 false Station identification. 90.425 Section 90.425... MOBILE RADIO SERVICES Operating Requirements § 90.425 Station identification. Stations licensed under...

  13. 47 CFR 87.261 - Scope of service.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Aeronautical Enroute and Aeronautical Fixed Stations Aeronautical Enroute Stations § 87.261 Scope of service. (a) Aeronautical enroute stations provide operational control communications to aircraft along... aircraft station licensee who makes cooperative arrangements for the operation, maintenance and liability...

  14. 47 CFR 87.261 - Scope of service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Aeronautical Enroute and Aeronautical Fixed Stations Aeronautical Enroute Stations § 87.261 Scope of service. (a) Aeronautical enroute stations provide operational control communications to aircraft along... aircraft station licensee who makes cooperative arrangements for the operation, maintenance and liability...

  15. 47 CFR 87.261 - Scope of service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Aeronautical Enroute and Aeronautical Fixed Stations Aeronautical Enroute Stations § 87.261 Scope of service. (a) Aeronautical enroute stations provide operational control communications to aircraft along... aircraft station licensee who makes cooperative arrangements for the operation, maintenance and liability...

  16. Apparatus for sequentially transporting containers

    NASA Technical Reports Server (NTRS)

    Hudgins, J. L. (Inventor)

    1982-01-01

    Apparatus for transferring and manipulating a plurality of containers in a sequence is disclosed including a mechanical manipulator arm having a gripping device which automatically picks up a container at a fixed pickup position P and transfers it to a processing station. At a processing station X, the container is loaded with silicon wafers and thereafter returned by the arm to the fixed position P at the pickup and return station Y. A plurality of the containers may be processed in sequence from the fixed pickup position by providing a movable carriage upon which container pedestal platforms are supported, at least one of which is an elevator platform. The platforms include abutments for properly positioning the containers for accurate pickup by the manipulator arm.

  17. Transit-oriented development: an examination of America's transit precincts in 2000 & 2010.

    DOT National Transportation Integrated Search

    2013-06-01

    This study creates a typology of all fixed transit precincts across the United States to categorize all stations as either a Transit Oriented Development (TOD), Transit Adjacent Development (TAD) or hybrid. This typology is based on an index that acc...

  18. DEVELOPMENT OF A MODEL FOR REAL TIME CO CONCENTRATIONS NEAR ROADWAYS

    EPA Science Inventory

    Although emission standards for mobile sources continue to be tightened, tailpipe emissions in urban areas continue to be a major source of human exposure to air toxics. Current human exposure models using simplified assumptions based on fixed air monitoring stations and region...

  19. Perception of mobile phone and base station risks.

    PubMed

    Siegrist, Michael; Earle, Timothy C; Gutscher, Heinz; Keller, Carmen

    2005-10-01

    Perceptions of risks associated with mobile phones, base stations, and other sources of electromagnetic fields (EMF) were examined. Data from a telephone survey conducted in the German- and French-speaking parts of Switzerland are presented (N = 1,015). Participants assessed both risks and benefits associated with nine different sources of EMF. Trust in the authorities regulating these hazards was assessed as well. In addition, participants answered a set of questions related to attitudes toward EMF and toward mobile phone base stations. According to respondents' assessments, high-voltage transmission lines are the most risky source of EMF. Mobile phones and mobile phone base stations received lower risk ratings. Results showed that trust in authorities was positively associated with perceived benefits and negatively associated with perceived risks. People who use their mobile phones frequently perceived lower risks and higher benefits than people who use their mobile phones infrequently. People who believed they lived close to a base station did not significantly differ in their level of risks associated with mobile phone base stations from people who did not believe they lived close to a base station. Regarding risk regulation, a majority of participants were in favor of fixing limiting values based on the worst-case scenario. Correlations suggest that belief in paranormal phenomena is related to level of perceived risks associated with EMF. Furthermore, people who believed that most chemical substances cause cancer also worried more about EMF than people who did not believe that chemical substances are that harmful. Practical implications of the results are discussed.

  20. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  1. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  2. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  3. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  4. 47 CFR 101.125 - Temporary fixed antenna height restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Temporary fixed antenna height restrictions... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.125 Temporary fixed antenna height restrictions. The overall antenna structure heights employed by mobile stations in the Local...

  5. 47 CFR 101.213 - Station identification.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Station identification. 101.213 Section 101.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.213 Station identification. Stations in these services are exempt...

  6. 47 CFR 101.213 - Station identification.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Station identification. 101.213 Section 101.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.213 Station identification. Stations in these services are exempt...

  7. 47 CFR 101.213 - Station identification.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Station identification. 101.213 Section 101.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.213 Station identification. Stations in these services are exempt...

  8. 47 CFR 101.213 - Station identification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Station identification. 101.213 Section 101.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.213 Station identification. Stations in these services are exempt...

  9. 47 CFR 101.213 - Station identification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station identification. 101.213 Section 101.213 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.213 Station identification. Stations in these services are exempt...

  10. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  11. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  12. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  13. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  14. 47 CFR 80.1189 - Portable ship earth stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Portable ship earth stations. 80.1189 Section....1189 Portable ship earth stations. (a) Portable ship earth stations are authorized to operate on board more than one ship. Portable ship earth stations are also authorized to be operated on board fixed...

  15. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized in...

  16. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized in...

  17. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized in...

  18. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized in...

  19. 47 CFR 101.217 - Station records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Station records. 101.217 Section 101.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.217 Station records. Each licensee of a station subject to this...

  20. 47 CFR 101.201 - Station inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Station inspection. 101.201 Section 101.201 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.201 Station inspection. The licensee of each station authorized in...

  1. 47 CFR 101.217 - Station records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Station records. 101.217 Section 101.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.217 Station records. Each licensee of a station subject to this...

  2. 47 CFR 101.217 - Station records.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Station records. 101.217 Section 101.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.217 Station records. Each licensee of a station subject to this...

  3. 47 CFR 101.217 - Station records.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Station records. 101.217 Section 101.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.217 Station records. Each licensee of a station subject to this...

  4. 47 CFR 101.217 - Station records.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Station records. 101.217 Section 101.217 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational Requirements § 101.217 Station records. Each licensee of a station subject to this...

  5. Designing efficient nitrous oxide sampling strategies in agroecosystems using simulation models

    NASA Astrophysics Data System (ADS)

    Saha, Debasish; Kemanian, Armen R.; Rau, Benjamin M.; Adler, Paul R.; Montes, Felipe

    2017-04-01

    Annual cumulative soil nitrous oxide (N2O) emissions calculated from discrete chamber-based flux measurements have unknown uncertainty. We used outputs from simulations obtained with an agroecosystem model to design sampling strategies that yield accurate cumulative N2O flux estimates with a known uncertainty level. Daily soil N2O fluxes were simulated for Ames, IA (corn-soybean rotation), College Station, TX (corn-vetch rotation), Fort Collins, CO (irrigated corn), and Pullman, WA (winter wheat), representing diverse agro-ecoregions of the United States. Fertilization source, rate, and timing were site-specific. These simulated fluxes surrogated daily measurements in the analysis. We ;sampled; the fluxes using a fixed interval (1-32 days) or a rule-based (decision tree-based) sampling method. Two types of decision trees were built: a high-input tree (HI) that included soil inorganic nitrogen (SIN) as a predictor variable, and a low-input tree (LI) that excluded SIN. Other predictor variables were identified with Random Forest. The decision trees were inverted to be used as rules for sampling a representative number of members from each terminal node. The uncertainty of the annual N2O flux estimation increased along with the fixed interval length. A 4- and 8-day fixed sampling interval was required at College Station and Ames, respectively, to yield ±20% accuracy in the flux estimate; a 12-day interval rendered the same accuracy at Fort Collins and Pullman. Both the HI and the LI rule-based methods provided the same accuracy as that of fixed interval method with up to a 60% reduction in sampling events, particularly at locations with greater temporal flux variability. For instance, at Ames, the HI rule-based and the fixed interval methods required 16 and 91 sampling events, respectively, to achieve the same absolute bias of 0.2 kg N ha-1 yr-1 in estimating cumulative N2O flux. These results suggest that using simulation models along with decision trees can reduce the cost and improve the accuracy of the estimations of cumulative N2O fluxes using the discrete chamber-based method.

  6. 47 CFR 25.115 - Application for earth station authorizations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... earth station applications must be filed electronically through the International Bureau Filing System... transmitting earth stations in the Fixed-Satellite Service may file on FCC Form 312EZ if all of the following... band; (ii) The earth station(s) will not be installed or operated on ships, aircraft, or other moving...

  7. 47 CFR 27.1184 - Triggering a reimbursement obligation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1710-1755 MHz, 2110-2155 MHz, 2160-2180 MHz Bands Cost-Sharing... a fixed base station at commercial power and the incumbent BRS system would have been within the... the 2150-2160/62 MHz band exclusively to provide one-way transmissions to subscribers, the...

  8. 47 CFR 27.70 - Information exchange.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Information exchange. 27.70 Section 27.70... COMMUNICATIONS SERVICES Technical Standards § 27.70 Information exchange. (a) Prior notification. Public safety... information to the public safety licensee at least 10 business days before a new base or fixed station is...

  9. 47 CFR 27.70 - Information exchange.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Information exchange. 27.70 Section 27.70... COMMUNICATIONS SERVICES Technical Standards § 27.70 Information exchange. (a) Prior notification. Public safety... information to the public safety licensee at least 10 business days before a new base or fixed station is...

  10. 47 CFR 27.70 - Information exchange.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Information exchange. 27.70 Section 27.70... COMMUNICATIONS SERVICES Technical Standards § 27.70 Information exchange. (a) Prior notification. Public safety... information to the public safety licensee at least 10 business days before a new base or fixed station is...

  11. 47 CFR 90.1321 - Power and antenna limits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Power and antenna limits. 90.1321 Section 90... and antenna limits. (a) Base and fixed stations are limited to 25 watts/25 MHz equivalent... receiver. (2) If the transmitter employs an antenna system that emits multiple directional beams but does...

  12. 47 CFR 90.1321 - Power and antenna limits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Power and antenna limits. 90.1321 Section 90... and antenna limits. (a) Base and fixed stations are limited to 25 watts/25 MHz equivalent... receiver. (2) If the transmitter employs an antenna system that emits multiple directional beams but does...

  13. 47 CFR 90.1321 - Power and antenna limits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Power and antenna limits. 90.1321 Section 90... and antenna limits. (a) Base and fixed stations are limited to 25 watts/25 MHz equivalent... receiver. (2) If the transmitter employs an antenna system that emits multiple directional beams but does...

  14. 47 CFR 90.1321 - Power and antenna limits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Power and antenna limits. 90.1321 Section 90... and antenna limits. (a) Base and fixed stations are limited to 25 watts/25 MHz equivalent... receiver. (2) If the transmitter employs an antenna system that emits multiple directional beams but does...

  15. 47 CFR 90.1321 - Power and antenna limits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Power and antenna limits. 90.1321 Section 90... and antenna limits. (a) Base and fixed stations are limited to 25 watts/25 MHz equivalent... receiver. (2) If the transmitter employs an antenna system that emits multiple directional beams but does...

  16. Space station software reliability analysis based on failures observed during testing at the multisystem integration facility

    NASA Technical Reports Server (NTRS)

    Tamayo, Tak Chai

    1987-01-01

    Quality of software not only is vital to the successful operation of the space station, it is also an important factor in establishing testing requirements, time needed for software verification and integration as well as launching schedules for the space station. Defense of management decisions can be greatly strengthened by combining engineering judgments with statistical analysis. Unlike hardware, software has the characteristics of no wearout and costly redundancies, thus making traditional statistical analysis not suitable in evaluating reliability of software. A statistical model was developed to provide a representation of the number as well as types of failures occur during software testing and verification. From this model, quantitative measure of software reliability based on failure history during testing are derived. Criteria to terminate testing based on reliability objectives and methods to estimate the expected number of fixings required are also presented.

  17. 47 CFR 95.29 - Channels available.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....6750, 462.7000 and 462.7250. (b) For a mobile station, control station, or fixed station operated in... population as defined in the U.S. Census of Population, 1960, Vol. 1, Table 23, page 50 that were authorized...

  18. 47 CFR 95.29 - Channels available.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ....6750, 462.7000 and 462.7250. (b) For a mobile station, control station, or fixed station operated in... population as defined in the U.S. Census of Population, 1960, Vol. 1, Table 23, page 50 that were authorized...

  19. 47 CFR 95.29 - Channels available.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ....6750, 462.7000 and 462.7250. (b) For a mobile station, control station, or fixed station operated in... population as defined in the U.S. Census of Population, 1960, Vol. 1, Table 23, page 50 that were authorized...

  20. 49 CFR 192.736 - Compressor stations: Gas detection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Compressor stations: Gas detection. 192.736... Compressor stations: Gas detection. (a) Not later than September 16, 1996, each compressor building in a compressor station must have a fixed gas detection and alarm system, unless the building is— (1) Constructed...

  1. 49 CFR 192.736 - Compressor stations: Gas detection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Compressor stations: Gas detection. 192.736... Compressor stations: Gas detection. (a) Not later than September 16, 1996, each compressor building in a compressor station must have a fixed gas detection and alarm system, unless the building is— (1) Constructed...

  2. 49 CFR 192.736 - Compressor stations: Gas detection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Compressor stations: Gas detection. 192.736... Compressor stations: Gas detection. (a) Not later than September 16, 1996, each compressor building in a compressor station must have a fixed gas detection and alarm system, unless the building is— (1) Constructed...

  3. 49 CFR 192.736 - Compressor stations: Gas detection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Compressor stations: Gas detection. 192.736... Compressor stations: Gas detection. (a) Not later than September 16, 1996, each compressor building in a compressor station must have a fixed gas detection and alarm system, unless the building is— (1) Constructed...

  4. 47 CFR 25.131 - Filing requirements and registration for receive-only earth stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... receive-only earth stations. 25.131 Section 25.131 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25..., subpart Y of this chapter. (b) Receive-only earth stations in the Fixed-Satellite Service that operate...

  5. The Impact of Satellites on Cable Communications.

    ERIC Educational Resources Information Center

    Chayes, Abram

    Two recent developments in communications satellite technology may speed the coming of cable TV (CATV) networks. First, increases in satellite power are reducing the cost of ground stations. Second, a connection between one ground station, the satellite, and any other ground station is no longer necessarily fixed. Now one station can communicate…

  6. STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). Director of Mission Operations Directorate (MOD) Eugene F. Kranz (left) and Chief of the Flight Directors Office Tommy W. Holloway monitor activity during the simulation. The two are at their normal stations on the rear row of consoles. The integrated simulation involves MCC flight controllers communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  7. 47 CFR 101.21 - Technical content of applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical... Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's name and address. Transmitting station...

  8. 47 CFR 101.21 - Technical content of applications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.21 Technical... Private Operational Fixed Point-to-Point Microwave Service and the Common Carrier Fixed Point-to-Point Microwave Service must include the following information: Applicant's name and address. Transmitting station...

  9. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... to private operational fixed point-to-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave systems, with a channel greater than or equal to 50 KHz bandwidth...

  10. Application of a space station to communications satellites

    NASA Technical Reports Server (NTRS)

    Ramler, J. R.

    1983-01-01

    The economic benefits of a space station relative to communications satellites are discussed in terms of technology experiments, spacecraft checkout, repair, servicing, and refurbishment (RSR), and mating an OTV with satellites for boost to GEO. The zero gravity, vacuum conditions, and atmosphere free long ranges are environmental features that can be used for testing large, flexible antennas and laser communications devices. Some resistance might be encountered to checkout in LEO due to the substantial success of launches to GEO without LEO checkout. However, new generations of larger, more complex satellites may warrant the presence of a space station to verify performance of new spacecraft. One RSR positive aspect for a space station is as a storage site for propellant, as well as for reusable OTV booster engines. Also, the space station can serve as a base for manned or unmanned repair spacecraft which will travel to GEO to fix malfunctions in geostationary satellites.

  11. Interference and Compatibility Studies Between Satellite Service Systems and Systems Using High Altitude Platform Stations

    NASA Astrophysics Data System (ADS)

    Milas, Vasilis; Koletta, Maria; Constantinou, Philip

    2003-07-01

    This paper provides the results of interference and compatibility studies in order to assess the sharing conditions between Fixed Satellite Service (FSS) and Fixed Service provided by High Altitude Platform Stations (HAPS) in the same operational frequency bands and discusses the most important operational parameters that have an impact on the interference calculations. To characterize interference phenomena between the two systems carrier to interference (C/I) ratios are evaluated. Simulation results under the scenario of a realistic deployment of HAPS and the use of different satellite configurations are presented. An interesting result derived from the simulations is that FSS/GSO Earth Stations and HAPS ground stations may coexist in the HAPS coverage area under certain considerations.

  12. Macro- and micro- geodynamic of Terebliya-Riksk geodetic man-caused polygon of Ukrainian Carpathians influenced by specificities of structure-geological and hydro-geological conditions

    NASA Astrophysics Data System (ADS)

    Kulchyzkyy, A.; Serebryannyy, Y.; Tretyak, K.; Trevogo, I.; Zadoroznnyy, V.

    2009-04-01

    Terebliya-Riksk diversion power station is located on two levels ( with difference of 180m ) of south mountainside of Ukrainian Carpathians and separate parts of this power station lie inside rock. Therefore influential parameters of it's stability are geological, tectonic and hydrogeological conditions in complex. Monitoring of intensity and nature of displacements of flow ( pressure) pipe and other objects of power station with geoditic methods indicates that fluctuations of water-level in reservoir caused bouth by natural and artificial efects are of great influence on objects mentioned. Based on geodetical high-precision observations made by LeicaTPS 1201 robotic total station short-periodic components of fundamental vibrations which result in their destructive deformation were determined. Mathematical apparatus ( which uses function of Fourie series and theory of cinematic coefficients ) for displacements determinations of pressure pipe was disigned. Complex of engineering-geological surveys gave an opportunity to define the origin of macro- and micro- geodynamics movements of Terebliya-Riksk diversion power station region. Engineering-geological conditions which influence on power station structure most of all were determined as following : small foldings and cleavage areas appearances, also fluctuations of level of underground water (refered to hydrogeological conditions). Periodic micro-displacemets appearances ( which operate on reducing-stretching scheme) fixed on power station structure are turned to be in direct relation on to what exend reservoir is filled up. Permanent macro- displacements appearances ( which operates in north-west direction ) fixed on pressure pipe are the result sum of residual micro-displacements caused by return periodic movements and are determined by structure-geological, engineering-geological and tectonic conditions.

  13. 47 CFR 90.723 - Selection and assignment of frequencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... shall specify the number of frequencies requested. All frequencies in this band will be assigned by the... assigned only the number of channels justified to meet their requirements. (d) Phase I base or fixed station receivers utilizing 221-222 MHz frequencies assigned from Sub-band A as designated in § 90.715(b...

  14. 47 CFR 90.723 - Selection and assignment of frequencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... shall specify the number of frequencies requested. All frequencies in this band will be assigned by the... assigned only the number of channels justified to meet their requirements. (d) Phase I base or fixed station receivers utilizing 221-222 MHz frequencies assigned from Sub-band A as designated in § 90.715(b...

  15. 47 CFR 90.723 - Selection and assignment of frequencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... shall specify the number of frequencies requested. All frequencies in this band will be assigned by the... assigned only the number of channels justified to meet their requirements. (d) Phase I base or fixed station receivers utilizing 221-222 MHz frequencies assigned from Sub-band A as designated in § 90.715(b...

  16. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... telephone network (PSTN), nor uses dial-up circuits in the PSTN. Licensees with complex communications... access these base stations through the microwave or operational fixed systems from positions in the PSTN... circuit is provided for each mode of transmitter operation (i.e., conventional, dial-up or Internet). (3...

  17. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... telephone network (PSTN), nor uses dial-up circuits in the PSTN. Licensees with complex communications... access these base stations through the microwave or operational fixed systems from positions in the PSTN... circuit is provided for each mode of transmitter operation (i.e., conventional, dial-up or Internet). (3...

  18. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... telephone network (PSTN), nor uses dial-up circuits in the PSTN. Licensees with complex communications... access these base stations through the microwave or operational fixed systems from positions in the PSTN... circuit is provided for each mode of transmitter operation (i.e., conventional, dial-up or Internet). (3...

  19. 47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... telephone network (PSTN), nor uses dial-up circuits in the PSTN. Licensees with complex communications... access these base stations through the microwave or operational fixed systems from positions in the PSTN... circuit is provided for each mode of transmitter operation (i.e., conventional, dial-up or Internet). (3...

  20. 47 CFR 74.601 - Classes of TV broadcast auxiliary stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... or other purposes as authorized in § 74.631. (d) TV translator relay station. A fixed station used... translator, and to other communications facilities that the Commission may authorize or for other purposes as..., TV STL, TV relay, or TV translator relay station and retransmits them on the same frequency. [65 FR...

  1. Simple Random Sampling-Based Probe Station Selection for Fault Detection in Wireless Sensor Networks

    PubMed Central

    Huang, Rimao; Qiu, Xuesong; Rui, Lanlan

    2011-01-01

    Fault detection for wireless sensor networks (WSNs) has been studied intensively in recent years. Most existing works statically choose the manager nodes as probe stations and probe the network at a fixed frequency. This straightforward solution leads however to several deficiencies. Firstly, by only assigning the fault detection task to the manager node the whole network is out of balance, and this quickly overloads the already heavily burdened manager node, which in turn ultimately shortens the lifetime of the whole network. Secondly, probing with a fixed frequency often generates too much useless network traffic, which results in a waste of the limited network energy. Thirdly, the traditional algorithm for choosing a probing node is too complicated to be used in energy-critical wireless sensor networks. In this paper, we study the distribution characters of the fault nodes in wireless sensor networks, validate the Pareto principle that a small number of clusters contain most of the faults. We then present a Simple Random Sampling-based algorithm to dynamic choose sensor nodes as probe stations. A dynamic adjusting rule for probing frequency is also proposed to reduce the number of useless probing packets. The simulation experiments demonstrate that the algorithm and adjusting rule we present can effectively prolong the lifetime of a wireless sensor network without decreasing the fault detected rate. PMID:22163789

  2. Simple random sampling-based probe station selection for fault detection in wireless sensor networks.

    PubMed

    Huang, Rimao; Qiu, Xuesong; Rui, Lanlan

    2011-01-01

    Fault detection for wireless sensor networks (WSNs) has been studied intensively in recent years. Most existing works statically choose the manager nodes as probe stations and probe the network at a fixed frequency. This straightforward solution leads however to several deficiencies. Firstly, by only assigning the fault detection task to the manager node the whole network is out of balance, and this quickly overloads the already heavily burdened manager node, which in turn ultimately shortens the lifetime of the whole network. Secondly, probing with a fixed frequency often generates too much useless network traffic, which results in a waste of the limited network energy. Thirdly, the traditional algorithm for choosing a probing node is too complicated to be used in energy-critical wireless sensor networks. In this paper, we study the distribution characters of the fault nodes in wireless sensor networks, validate the Pareto principle that a small number of clusters contain most of the faults. We then present a Simple Random Sampling-based algorithm to dynamic choose sensor nodes as probe stations. A dynamic adjusting rule for probing frequency is also proposed to reduce the number of useless probing packets. The simulation experiments demonstrate that the algorithm and adjusting rule we present can effectively prolong the lifetime of a wireless sensor network without decreasing the fault detected rate.

  3. 47 CFR 80.369 - Distress, urgency, safety, call and reply frequencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... assignable to maritime stations for distress, urgency, safety, call and reply radiotelephony communications... by Alaska private fixed stations for calling and listening, but only for establishing communication... public coast stations for call and reply communications. The paired ship frequencies are available for...

  4. 47 CFR 1.907 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... term also encompasses requests to assign rights granted by the authorization or to transfer control of.... This power is specified by the Commission in the station's authorization or rules. Control station. A fixed station, the transmissions of which are used to control automatically the emissions or operations...

  5. 47 CFR 78.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...), and (d) of this section. (b) Local distribution service (LDS) station. A fixed CARS station used... headend of a cable television system. (d) Cable Television Relay Service PICKUP station. A land mobile.... For other definitions, see part 76 (Cable Television Service) of this chapter. (a) Cable television...

  6. 47 CFR 78.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...), and (d) of this section. (b) Local distribution service (LDS) station. A fixed CARS station used... headend of a cable television system. (d) Cable Television Relay Service PICKUP station. A land mobile.... For other definitions, see part 76 (Cable Television Service) of this chapter. (a) Cable television...

  7. 47 CFR 78.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...), and (d) of this section. (b) Local distribution service (LDS) station. A fixed CARS station used... headend of a cable television system. (d) Cable Television Relay Service PICKUP station. A land mobile.... For other definitions, see part 76 (Cable Television Service) of this chapter. (a) Cable television...

  8. 47 CFR 78.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...), and (d) of this section. (b) Local distribution service (LDS) station. A fixed CARS station used... headend of a cable television system. (d) Cable Television Relay Service PICKUP station. A land mobile.... For other definitions, see part 76 (Cable Television Service) of this chapter. (a) Cable television...

  9. 47 CFR 78.5 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...), and (d) of this section. (b) Local distribution service (LDS) station. A fixed CARS station used... headend of a cable television system. (d) Cable Television Relay Service PICKUP station. A land mobile.... For other definitions, see part 76 (Cable Television Service) of this chapter. (a) Cable television...

  10. 47 CFR 1.903 - Authorization required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Applications and Proceedings Scope and Authority § 1.903 Authorization required. (a) General rule. Stations in... period specified in the authorization. Authorizations may be granted upon proper application, provided... operate mobile or fixed stations in the Wireless Radio Services, except for certain stations in the Rural...

  11. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of... Satellite Transmit/Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159...) 312 Main & 159 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less...

  12. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of... Satellite Transmit/Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159...) 312 Main & 159 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less...

  13. Sharing criteria and performance standards for the 11.7-12.2 GHz band in region 2

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Possible criteria for sharing between the broadcasting-satellite and the fixed-satellite services are considered for each of several parameters in three categories: system, space station, and earth station. Criteria for sharing between the two satellite services and the three terrestrial services to which the 12-GHz band is allocated are discussed separately, first for the case of the fixed and mobile services and then for the broadcasting service.

  14. Sampling Design and Procedures for Fixed Surface-Water Sites in the Georgia-Florida Coastal Plain Study Unit, 1993

    DTIC Science & Technology

    1995-01-01

    Station number Station drainage area (km2) Land resource province Land-use description Fixed-site type Altamaha River near Everett City, Ga . 02226160...Creek near Tallahassee, Fla. 02326838 27 SCP suburban indicator Little River near Ty Ty, Ga . 02317797 334 SCP agriculture (mixed row crops) indicator...Middle Prong St. Marys River near Taylor, Fla. 02229000 324 CFW silviculture indicator Tucsawhatchee Creek near Hawkinsville, Ga . 02215100 422 SCP

  15. STS-37 Mission Specialist (MS) Ross during simulation in JSC's FB-SMS

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-37 Mission Specialist (MS) Jerry L. Ross 'borrows' the pilots station to rehearse some of his scheduled duties for his upcoming mission. He is on the flight deck of the fixed-based (FB) shuttle mission simulator (SMS) during this unsuited simulation. The SMS is part of JSC's Mission Simulation and Training Facility Bldg 5.

  16. 47 CFR 90.733 - Permissible operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... ability to construct and operate its nationwide land mobile system, as required in §§ 90.713 (b), (c) and... paging or fixed systems on a primary basis instead of or in addition to its land mobile operations, it... benchmark for the construction of its land mobile system base stations as prescribed in § 90.725(a); and (2...

  17. 47 CFR 1.903 - Authorization required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Wireless Radio Services Applications and Proceedings Scope and Authority § 1.903 Authorization required. (a) General rule. Stations in the Wireless Radio Services must be used and operated only in accordance with... subscribers to operate mobile or fixed stations in the Wireless Radio Services, except for certain stations in...

  18. 47 CFR 1.903 - Authorization required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Wireless Radio Services Applications and Proceedings Scope and Authority § 1.903 Authorization required. (a) General rule. Stations in the Wireless Radio Services must be used and operated only in accordance with... subscribers to operate mobile or fixed stations in the Wireless Radio Services, except for certain stations in...

  19. 47 CFR 1.903 - Authorization required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Wireless Radio Services Applications and Proceedings Scope and Authority § 1.903 Authorization required. (a) General rule. Stations in the Wireless Radio Services must be used and operated only in accordance with... subscribers to operate mobile or fixed stations in the Wireless Radio Services, except for certain stations in...

  20. Development, deployment, and evaluation of a remote monitoring system and a virtual weigh station : final report.

    DOT National Transportation Integrated Search

    2005-11-01

    In order to extend commercial vehicle enforcement coverage to routes that are not monitored by fixed weigh stations, Kentucky has developed and implemented a Remote Monitoring System (RMS) and a Virtual Weight Station (VWS). The RMS captures images o...

  1. STS-31 crewmembers during simulation on the flight deck of JSC's FB-SMS

    NASA Technical Reports Server (NTRS)

    1988-01-01

    On the flight deck of JSC's fixed based (FB) shuttle mission simulator (SMS), Mission Specialist (MS) Steven A. Hawley (left), on aft flight deck, looks over the shoulders of Commander Loren J. Shriver, seated at the commanders station (left) and Pilot Charles F. Bolden, seated at the pilots station and partially blocked by the seat's headrest (right). The three astronauts recently named to the STS-31 mission aboard Discovery, Orbiter Vehicle (OV) 103, go through a procedures checkout in the FB-SMS. The training simulation took place in JSC's Mission Simulation and Training Facility Bldg 5.

  2. STS-44 Atlantis, OV-104, crewmembers participate in FB-SMS training at JSC

    NASA Image and Video Library

    1991-04-22

    S91-35303 (22 April 1991) --- Astronauts Frederick D. Gregory (left) and Terrence T. Henricks (right), STS-44 commander and pilot, respectively, are joined near their launch and entry stations by F. Story Musgrave, mission specialist. The three pause while rehearsing some of the activities that will be performed during the scheduled ten-day November flight. Musgrave will be in a rear cabin station during launch and entry phases of the flight deck of the fixed-base Shuttle Mission Simulator (SMS) in the Johnson Space Center's mission simulation and training facility.

  3. STS-104 Crew Training Clips

    NASA Technical Reports Server (NTRS)

    2001-01-01

    The crewmembers of STS-104, Commander Steven Lindsey, Pilot Charles Hobaugh, and Mission Specialists Michael Gernhardt, James Reilly, and Janet Kavandi, are seen during various stages of their training. Footage shows the following: (1) Water Survival Training at the Neutral Buoyancy Laboratory (NBL); (2) Rendezvous and Docking Training in the Shuttle Mission Simulator; (3) Training in the Space Station Airlock; (4) Training in the Virtual Reality Lab; (5) Post-insertion Operations in the Fixed Base Simulator; (6) Extravehicular Activity Training at the NBL; (7) Crew Stowage Training in the Space Station Mock-up Training Facility; and (8) Water Transfer Training in the Crew Compartment Trainer.

  4. 47 CFR 78.1 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... television and related audio signals, signals of standard and FM broadcast stations, signals of BRS/EBS fixed... audio signals to TV translator and low-power TV stations. [69 FR 72046, Dec. 10, 2004] ...

  5. 47 CFR 78.1 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... television and related audio signals, signals of standard and FM broadcast stations, signals of BRS/EBS fixed... audio signals to TV translator and low-power TV stations. [69 FR 72046, Dec. 10, 2004] ...

  6. 47 CFR 78.1 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... television and related audio signals, signals of standard and FM broadcast stations, signals of BRS/EBS fixed... audio signals to TV translator and low-power TV stations. [69 FR 72046, Dec. 10, 2004] ...

  7. 47 CFR 78.1 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... television and related audio signals, signals of standard and FM broadcast stations, signals of BRS/EBS fixed... audio signals to TV translator and low-power TV stations. [69 FR 72046, Dec. 10, 2004] ...

  8. 47 CFR 78.1 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... television and related audio signals, signals of standard and FM broadcast stations, signals of BRS/EBS fixed... audio signals to TV translator and low-power TV stations. [69 FR 72046, Dec. 10, 2004] ...

  9. Analysis of broadcasting satellite service feeder link power control and polarization

    NASA Technical Reports Server (NTRS)

    Sullivan, T. M.

    1982-01-01

    Statistical analyses of carrier to interference power ratios (C/Is) were performed in assessing 17.5 GHz feeder links using (1) fixed power and power control, and (2) orthogonal linear and orthogonal circular polarizations. The analysis methods and attenuation/depolarization data base were based on CCIR findings to the greatest possible extent. Feeder links using adaptive power control were found to neither cause or suffer significant C/I degradation relative to that for fixed power feeder links having similar or less stringent availability objectives. The C/Is for sharing between orthogonal linearly polarized feeder links were found to be significantly higher than those for circular polarization only in links to nominally colocated satellites from nominally colocated Earth stations in high attenuation environments.

  10. 47 CFR 80.374 - Provisions for frequencies in the 4000-4063 and the 8100-8195 kHz bands shared with the fixed...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ship-to-shore duplex operations with coast stations assigned the frequencies described in § 80.371(b... shore-to-ship simplex operations; or (iv) Duplex operations with coast stations assigned in the band... coast stations for: (i) Supplementary ship-to-shore duplex operations with coast stations assigned the...

  11. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of.../Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159 2,615.00 BAX b... 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6...

  12. 47 CFR 101.503 - Digital Electronic Message Service Nodal Stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Digital Electronic Message Service Nodal... AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.503 Digital Electronic Message Service Nodal Stations. 10.6 GHz DEMS Nodal Stations may be...

  13. 75 FR 52733 - Record of Decision (ROD) for Fort Bliss Army Growth and Force Structure Realignment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... alternative consists of actions in three different categories (stationing/training, land use changes, and... (Stationing Action Alternative 4); land use changes that allow fixed site bivouac areas, mission support... supports Army expansion, future stationing actions, and land use changes and training infrastructure...

  14. 75 FR 24930 - Fort Bliss (Texas) Army Growth and Force Structure Realignment Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... effects that would result from use of stationing and training capacity, land use changes, and training... 4 stationing action; Alternative 5 land use change; and Alternative 4 training infrastructure... stationing package. Alternative 5 land use changes allow fixed sites (e.g., military bivouac), mission...

  15. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., this tolerance will govern the marketing of LTTS equipment and the issuance of all such authorizations... stations providing MVDDS. 5 For private operational fixed point-to-point microwave systems, with a channel... address remote stations with channels greater than 12.5 KHz bandwidth, ±0.0005%. 6 For stations authorized...

  16. 47 CFR 80.177 - When operator license is not required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) A shore radar, a shore radiolocation, maritime support or shore radionavigation station; (2) A survival craft station or an emergency position indicating radio beacon; (3) A ship radar station if: (i) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device...

  17. 47 CFR 80.177 - When operator license is not required.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) A shore radar, a shore radiolocation, maritime support or shore radionavigation station; (2) A survival craft station or an emergency position indicating radio beacon; (3) A ship radar station if: (i) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device...

  18. 47 CFR 25.209 - Earth station antenna performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.209 Earth station antenna performance standards. (a) The gain of any antenna to be employed in transmission from an earth station in the Fixed-Satellite Service shall lie below the envelope defined in paragraphs (a)(1) through (4) of this section: (1...

  19. 75 FR 1285 - Vehicle-Mounted Earth Stations (VMES)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... Earth Stations (VMES) AGENCY: Federal Communications Commission. ACTION: Final Rule; announcement of...-Mounted Earth Stations in Certain Frequency Bands Allocated to the Fixed-Satellite Service, IB Docket No...(i), 4(j), 7(a), 301, 303(c), 303(f), 303(g), 303(r), 303(y) and 308 of the Communications Act of...

  20. 47 CFR 25.209 - Earth station antenna performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES SATELLITE COMMUNICATIONS Technical Standards § 25.209 Earth station antenna performance standards... transmission from an earth station in the Fixed-Satellite Service shall lie below the relevant envelope defined in paragraphs (a)(1) through (4) of this section: (1) In the plane of the geostationary satellite...

  1. 47 CFR 80.177 - When operator license is not required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) A shore radar, a shore radiolocation, maritime support or shore radionavigation station; (2) A survival craft station or an emergency position indicating radio beacon; (3) A ship radar station if: (i) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device...

  2. 47 CFR 80.177 - When operator license is not required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) A shore radar, a shore radiolocation, maritime support or shore radionavigation station; (2) A survival craft station or an emergency position indicating radio beacon; (3) A ship radar station if: (i) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device...

  3. 47 CFR 80.177 - When operator license is not required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) A shore radar, a shore radiolocation, maritime support or shore radionavigation station; (2) A survival craft station or an emergency position indicating radio beacon; (3) A ship radar station if: (i) The radar frequency is determined by a nontunable, pulse type magnetron or other fixed tuned device...

  4. The Shuttle Mission Simulator computer generated imagery

    NASA Technical Reports Server (NTRS)

    Henderson, T. H.

    1984-01-01

    Equipment available in the primary training facility for the Space Transportation System (STS) flight crews includes the Fixed Base Simulator, the Motion Base Simulator, the Spacelab Simulator, and the Guidance and Navigation Simulator. The Shuttle Mission Simulator (SMS) consists of the Fixed Base Simulator and the Motion Base Simulator. The SMS utilizes four visual Computer Generated Image (CGI) systems. The Motion Base Simulator has a forward crew station with six-degrees of freedom motion simulation. Operation of the Spacelab Simulator is planned for the spring of 1983. The Guidance and Navigation Simulator went into operation in 1982. Aspects of orbital visual simulation are discussed, taking into account the earth scene, payload simulation, the generation and display of 1079 stars, the simulation of sun glare, and Reaction Control System jet firing plumes. Attention is also given to landing site visual simulation, and night launch and landing simulation.

  5. Development and Testing of an Algorithm for Efficient Resource Positioning in Pre-hospital Emergency Care

    PubMed Central

    Saini, Devashish; Mazza, Giovanni; Shah, Najaf; Mirza, Muzna; Gori, Mandar M; Nandigam, Hari Krishna; Orthner, Helmuth F

    2006-01-01

    Response times for pre-hospital emergency care may be improved with the use of algorithms that analyzes historical patterns in incident location and suggests optimal places for prepositioning of emergency response units. We will develop such an algorithm based on cluster analysis and test whether it leads to significant improvement in mileage when compared to actual historical data of dispatching based on fixed stations. PMID:17238702

  6. Development and testing of an algorithm for efficient resource positioning in pre-hospital emergency care.

    PubMed

    Saini, Devashish; Mazza, Giovanni; Shah, Najaf; Mirza, Muzna; Gori, Mandar M; Nandigam, Hari Krishna; Orthner, Helmuth F

    2006-01-01

    Response times for pre-hospital emergency care may be improved with the use of algorithms that analyzes historical patterns in incident location and suggests optimal places for pre-positioning of emergency response units. We will develop such an algorithm based on cluster analysis and test whether it leads to significant improvement in mileage when compared to actual historical data of dispatching based on fixed stations.

  7. An intelligent control and virtual display system for evolutionary space station workstation design

    NASA Technical Reports Server (NTRS)

    Feng, Xin; Niederjohn, Russell J.; Mcgreevy, Michael W.

    1992-01-01

    Research and development of the Advanced Display and Computer Augmented Control System (ADCACS) for the space station Body-Ported Cupola Virtual Workstation (BP/VCWS) were pursued. The potential applications were explored of body ported virtual display and intelligent control technology for the human-system interfacing applications is space station environment. The new system is designed to enable crew members to control and monitor a variety of space operations with greater flexibility and efficiency than existing fixed consoles. The technologies being studied include helmet mounted virtual displays, voice and special command input devices, and microprocessor based intelligent controllers. Several research topics, such as human factors, decision support expert systems, and wide field of view, color displays are being addressed. The study showed the significant advantages of this uniquely integrated display and control system, and its feasibility for human-system interfacing applications in the space station command and control environment.

  8. Abyssal BEnthic Laboratory (ABEL): a novel approach for long-term investigation at abyssal depths

    NASA Astrophysics Data System (ADS)

    Berta, M.; Gasparoni, F.; Capobianco, M.

    1995-03-01

    This study assesses the feasibility of a configuration for a benthic underwater system, called ABEL (Abyssal BEnthic Laboratory), capable of operating both under controlled and autonomous modes for periods of several months to over one year at abyssal depths up to 6000 m. A network of stations, capable of different configurations, has been identified as satisfying the widest range of scientific expectations, and at the same time to address the technological challenge to increase the feasibility of scientific investigations, even when the need is not yet well specified. The overall system consists of a central Benthic Investigation Laboratory, devoted to the execution of the most complex scientific activities, with fixed Satellite Stations acting as nodes of a measuring network and a Mobile Station extending ABEL capabilities with the possibility to carry out surveys over the investigation area and interventions on the fixed stations. ABEL architecture also includes a dedicated deployment and recovery module, as well as sea-surface and land-based facilities. Such an installation constitutes the sea-floor equivalent of a meteorological or geophysical laboratory. Attention has been paid to selecting investigation tools supporting the ABEL system to carry out its mission with high operativity and minimal risk and environmental impact. This demands technologies to enable presence and operation at abyssal depths for the required period of time. Presence can be guaranteed by proper choice of power supply and communication systems. Operations require visual and manipulative capabilities, as well as deployment and retrieval capabilities. Advanced control system architectures must be considered, along with knowledge based approaches, to comply with the requirements for autonomous control. The results of this investigation demonstrate the feasibility of the ABEL concept and the pre-dimensioning of its main components.

  9. Adaptive Subframe Partitioning and Efficient Packet Scheduling in OFDMA Cellular System with Fixed Decode-and-Forward Relays

    NASA Astrophysics Data System (ADS)

    Wang, Liping; Ji, Yusheng; Liu, Fuqiang

    The integration of multihop relays with orthogonal frequency-division multiple access (OFDMA) cellular infrastructures can meet the growing demands for better coverage and higher throughput. Resource allocation in the OFDMA two-hop relay system is more complex than that in the conventional single-hop OFDMA system. With time division between transmissions from the base station (BS) and those from relay stations (RSs), fixed partitioning of the BS subframe and RS subframes can not adapt to various traffic demands. Moreover, single-hop scheduling algorithms can not be used directly in the two-hop system. Therefore, we propose a semi-distributed algorithm called ASP to adjust the length of every subframe adaptively, and suggest two ways to extend single-hop scheduling algorithms into multihop scenarios: link-based and end-to-end approaches. Simulation results indicate that the ASP algorithm increases system utilization and fairness. The max carrier-to-interference ratio (Max C/I) and proportional fairness (PF) scheduling algorithms extended using the end-to-end approach obtain higher throughput than those using the link-based approach, but at the expense of more overhead for information exchange between the BS and RSs. The resource allocation scheme using ASP and end-to-end PF scheduling achieves a tradeoff between system throughput maximization and fairness.

  10. 78 FR 39200 - Federal Earth Stations-Non-Federal Fixed Satellite Service Space Stations; Spectrum for Non...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-01

    ... stations comply with the Commission's rules for operating in the frequency bands. 11. The Commission seeks... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Part 2 [ET Docket No. 13-115; RM-11341; FCC 13-65... Launch Operations AGENCY: Federal Communications Commission. ACTION: Proposed rule. SUMMARY: This...

  11. RadNet Air Quality (Fixed Station) Data

    EPA Pesticide Factsheets

    RadNet is a national network of monitoring stations that regularly collect air for analysis of radioactivity. The RadNet network, which has stations in each State, has been used to track environmental releases of radioactivity from nuclear weapons tests and nuclear accidents. RadNet also documents the status and trends of environmental radioactivity

  12. 47 CFR 101.525 - 24 GHz system operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... operations. (a) A licensee using the 24 GHz band may construct and operate any number of fixed stations anywhere within the area authorized to serve without prior authorization, except as follows: (1) A station...) Submission of an Environmental Assessment is required under § 1.1307 of this chapter; (iii) The station would...

  13. Performance analysis of PPP ambiguity resolution with UPD products estimated from different scales of reference station networks

    NASA Astrophysics Data System (ADS)

    Wang, Siyao; Li, Bofeng; Li, Xingxing; Zang, Nan

    2018-01-01

    Integer ambiguity fixing with uncalibrated phase delay (UPD) products can significantly shorten the initialization time and improve the accuracy of precise point positioning (PPP). Since the tracking arcs of satellites and the behavior of atmospheric biases can be very different for the reference networks with different scales, the qualities of corresponding UPD products may be also various. The purpose of this paper is to comparatively investigate the influence of different scales of reference station networks on UPD estimation and user ambiguity resolution. Three reference station networks with global, wide-area and local scales are used to compute the UPD products and analyze their impact on the PPP-AR. The time-to-first-fix, the unfix rate and the incorrect fix rate of PPP-AR are analyzed. Moreover, in order to further shorten the convergence time for obtaining precise positioning, a modified partial ambiguity resolution (PAR) and corresponding validation strategy are presented. In this PAR method, the ambiguity subset is determined by removing the ambiguity one by one in the order of ascending elevations. Besides, for static positioning mode, a coordinate validation strategy is employed to enhance the reliability of the fixed coordinate. The experiment results show that UPD products computed by smaller station network are more accurate and lead to a better coordinate solution; the PAR method used in this paper can shorten the convergence time and the coordinate validation strategy can improve the availability of high precision positioning.

  14. Development of the network architecture of the Canadian MSAT system

    NASA Technical Reports Server (NTRS)

    Davies, N. George; Shoamanesh, Alireza; Leung, Victor C. M.

    1988-01-01

    A description is given of the present concept for the Canadian Mobile Satellite (MSAT) System and the development of the network architecture which will accommodate the planned family of three categories of service: a mobile radio service (MRS), a mobile telephone service (MTS), and a mobile data service (MDS). The MSAT satellite will have cross-strapped L-band and Ku-band transponders to provide communications services between L-band mobile terminals and fixed base stations supporting dispatcher-type MRS, gateway stations supporting MTS interconnections to the public telephone network, data hub stations supporting the MDS, and the network control center. The currently perceived centralized architecture with demand assignment multiple access for the circuit switched MRS, MTS and permanently assigned channels for the packet switched MDS is discussed.

  15. Development of the network architecture of the Canadian MSAT system

    NASA Astrophysics Data System (ADS)

    Davies, N. George; Shoamanesh, Alireza; Leung, Victor C. M.

    1988-05-01

    A description is given of the present concept for the Canadian Mobile Satellite (MSAT) System and the development of the network architecture which will accommodate the planned family of three categories of service: a mobile radio service (MRS), a mobile telephone service (MTS), and a mobile data service (MDS). The MSAT satellite will have cross-strapped L-band and Ku-band transponders to provide communications services between L-band mobile terminals and fixed base stations supporting dispatcher-type MRS, gateway stations supporting MTS interconnections to the public telephone network, data hub stations supporting the MDS, and the network control center. The currently perceived centralized architecture with demand assignment multiple access for the circuit switched MRS, MTS and permanently assigned channels for the packet switched MDS is discussed.

  16. 77 FR 50049 - Procedures To Govern the Use of Satellite Earth Stations on Board Vessels in the 5925-6425 MHz...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ...-space) frequency band, operating with Geostationary Satellite Orbit (GSO) Satellites in the Fixed... with Geostationary Orbit (GSO) Satellites in the Fixed- Satellite Service. (a) The following ongoing...

  17. Continuous flow measurements using fixed ultrasonic meters

    USGS Publications Warehouse

    Oltmann, Rick

    1993-01-01

    USGS has or soon will be installing four continuous flow-monitoring stations in the delta that will use ultrasonic velocity meters (DVM). Funding for the stations has been provided by USGS, DWR, USBR, and Contra Costa Water District.

  18. Antenna unit and radio base station therewith

    DOEpatents

    Kuwahara, Mikio; Doi, Nobukazu; Suzuki, Toshiro; Ishida, Yuji; Inoue, Takashi; Niida, Sumaru

    2007-04-10

    Phase and amplitude deviations, which are generated, for example, by cables connecting an array antenna of a CDMA base station and the base station, are calibrated in the baseband. The base station comprises: an antenna apparatus 1; couplers 2; an RF unit 3 that converts a receive signal to a baseband signal, converts a transmit signal to a radio frequency, and performs power control; an A/D converter 4 for converting a receive signal to a digital signal; a receive beam form unit 6 that multiplies the receive signal by semi-fixed weight; a despreader 7 for this signal input; a time-space demodulator 8 for demodulating user data; a despreader 9 for probe signal; a space modulator 14 for user data; a spreader 13 for user signal; a channel combiner 12; a Tx calibrater 11 for controlling calibration of a signal; a D/A converter 10; a unit 16 for calculation of correlation matrix for generating a probe signal used for controlling an Rx calibration system and a TX calibration system; a spreader 17 for probe signal; a power control unit 18; a D/A converter 19; an RF unit 20 for probe signal; an A/D converter 21 for signal from the couplers 2; and a despreader 22.

  19. USGS Menlo Park GPS Data Processing Techniques and Derived North America Velocity Field (Invited)

    NASA Astrophysics Data System (ADS)

    Svarc, J. L.; Murray-Moraleda, J. R.; Langbein, J. O.

    2010-12-01

    The U.S. Geological Survey in Menlo Park routinely conducts repeated GPS surveys of geodetic markers throughout the western United States using dual-frequency geodetic GPS receivers. We combine campaign, continuous, and semi-permanent data to present a North America fixed velocity field for regions in the western United States. Mobile campaign-based surveys require less up-front investment than permanently monumented and telemetered GPS systems, and hence have achieved a broad and dense spatial coverage. The greater flexibility and mobility comes at the cost of greater uncertainties in individual daily position solutions. We also routinely process continuous GPS data collected at PBO stations operated by UNAVCO along with data from other continuous GPS networks such as BARD, PANGA, and CORS operated by other agencies. We have broken the Western US into several subnetworks containing approximately 150-250 stations each. The data are processed using JPL’s GIPSY-OASIS II release 5.0 software using a modified precise positioning strategy (Zumberge and others, 1997). We use the “ambizap” code provided by Geoff Blewitt (Blewitt, 2008) to fix phase ambiguities in continuous networks. To mitigate the effect of common mode noise we use the positions of stations in the network with very long, clean time series (i.e. those with no large outliers or offsets) to transform all position estimates into “regionally filtered” results following the approach of Hammond and Thatcher (2007). Velocity uncertainties from continuously operated GPS stations tend to be about 3 times smaller than those from campaign data. Langbein (2004) presents a maximum likelihood method for fitting a time series employing a variety of temporal noise models. We assume that GPS observations are contaminated by a combination of white, flicker, and random walk noise. For continuous and semi-permanent time series longer than 2 years we estimate these values, otherwise we fix the amplitudes of these processes to 0.85 mm, 1.7 mm/yr1/4, and 0.4 mm/yr1/2 respectively for the north components, 0.84 mm, 1.4 mm/yr1/4, and 0.6 mm/yr1/2 respectively for the east components and 3.2 mm, 6.4 mm/yr1/4, and 0.0 mm/yr1/2 respectively for the vertical. We have also deployed “semi-permanent” stations in selected regions of California. Semi-permanent stations have the advantage of increasing the density of coverage without the high cost of monumentation and telemetry associated with continuous GPS stations. Also, because of the increased temporal coverage of these stations, accurate estimates of station velocities can be achieved in a far shorter time period than from campaign mode surveys.

  20. 47 CFR 87.19 - Basic eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Applications and Licenses § 87.19 Basic eligibility. (a) General. Foreign governments or their representatives cannot hold station licenses. (b) Aeronautical enroute and aeronautical fixed stations. The following...

  1. 75 FR 19401 - Petition for Reconsideration of Action in Rulemaking Proceeding

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-14

    ... Procedures to Govern the Use of Satellite Earth Stations on Board Vessels in the 5925-6425 MHz/3700-4200 MHz...-Mounted Earth Stations in Certain Frequency Bands Allocated to the Fixed-Satellite Service (IB Docket No...

  2. Dual keel Space Station payload pointing system design and analysis feasibility study

    NASA Technical Reports Server (NTRS)

    Smagala, Tom; Class, Brian F.; Bauer, Frank H.; Lebair, Deborah A.

    1988-01-01

    A Space Station attached Payload Pointing System (PPS) has been designed and analyzed. The PPS is responsible for maintaining fixed payload pointing in the presence of disturbance applied to the Space Station. The payload considered in this analysis is the Solar Optical Telescope. System performance is evaluated via digital time simulations by applying various disturbance forces to the Space Station. The PPS meets the Space Station articulated pointing requirement for all disturbances except Shuttle docking and some centrifuge cases.

  3. STS-44 Atlantis, OV-104, Pilot Henricks in FB-SMS training at JSC

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-44 Atlantis, Orbiter Vehicle (OV) 104, Pilot Terence T. Henricks, seated at the pilots station on the forward flight deck, reviews checklists before a flight simulation in the Fixed Base (FB) Shuttle Mission Simulator (SMS) located in JSC's Mission Simulation and Training Facility Bldg 5. Surrounding Henricks are the seat back, the overhead panels, forward panels, and forward windows.

  4. 47 CFR 90.267 - Assignment and use of frequencies in the 450-470 MHz band for low power use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operation determine whether a station is within an “80 km circle.” (i) The maximum ERP for low power... ERP for low power operation on these frequencies is as follows: Operation Low side of frequency pair.... (2) Operation on these frequencies is limited to 6 watts ERP for base, mobile or operational fixed...

  5. UAS CNPC Satellite Link Performance - Sharing Spectrum with Terrestrial Systems

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Wilson, Jeffrey D.; Bishop, William D.

    2016-01-01

    In order to provide for the safe integration of unmanned aircraft systems into the National Airspace System, the control and non-payload communications (CNPC) link connecting the ground-based pilot with the unmanned aircraft must be highly reliable. A specific requirement is that it must operate using aviation safety radiofrequency spectrum. The 2012 World Radiocommunication Conference (WRC-12) provided a potentially suitable allocation for radio line-of-sight (LOS), terrestrial based CNPC link at 5030-5091 MHz. For a beyond radio line-of-sight (BLOS), satellite-based CNPC link, aviation safety spectrum allocations are currently inadequate. Therefore, the 2015 WRC will consider the use of Fixed Satellite Service (FSS) bands to provide BLOS CNPC under Agenda Item 1.5. This agenda item requires studies to be conducted to allow for the consideration of how unmanned aircraft can employ FSS for BLOS CNPC while maintaining existing systems. Since there are terrestrial Fixed Service systems also using the same frequency bands under consideration in Agenda Item 1.5 one of the studies required considered spectrum sharing between earth stations on-board unmanned aircraft and Fixed Service station receivers. Studies carried out by NASA have concluded that such sharing is possible under parameters previously established by the International Telecommunications Union. As the preparation for WRC-15 has progressed, additional study parameters Agenda Item 1.5 have been proposed, and some studies using these parameters have been added. This paper examines the study results for the original parameters as well as results considering some of the more recently proposed parameters to provide insight into the complicated process of resolving WRC-15 Agenda Item 1.5 and achieving a solution for BLOS CNPC for unmanned aircraft.

  6. 47 CFR 101.1 - Scope and authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...

  7. 47 CFR 101.1 - Scope and authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...

  8. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  9. 47 CFR 101.1 - Scope and authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...

  10. 47 CFR 101.1 - Scope and authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...

  11. 47 CFR 101.1 - Scope and authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... applications for radio station licenses in the fixed microwave services. (b) The purpose of the rules in this..., microwave operations that require transmitting facilities on land or in specified offshore coastal areas...

  12. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  13. 47 CFR 101.107 - Frequency tolerance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE...-point microwave and stations providing MVDDS. 5 For private operational fixed point-to-point microwave... noted in the table of paragraph (a) of this section. (b) Heterodyne microwave radio systems may be...

  14. Estimation of satellite position, clock and phase bias corrections

    NASA Astrophysics Data System (ADS)

    Henkel, Patrick; Psychas, Dimitrios; Günther, Christoph; Hugentobler, Urs

    2018-05-01

    Precise point positioning with integer ambiguity resolution requires precise knowledge of satellite position, clock and phase bias corrections. In this paper, a method for the estimation of these parameters with a global network of reference stations is presented. The method processes uncombined and undifferenced measurements of an arbitrary number of frequencies such that the obtained satellite position, clock and bias corrections can be used for any type of differenced and/or combined measurements. We perform a clustering of reference stations. The clustering enables a common satellite visibility within each cluster and an efficient fixing of the double difference ambiguities within each cluster. Additionally, the double difference ambiguities between the reference stations of different clusters are fixed. We use an integer decorrelation for ambiguity fixing in dense global networks. The performance of the proposed method is analysed with both simulated Galileo measurements on E1 and E5a and real GPS measurements of the IGS network. We defined 16 clusters and obtained satellite position, clock and phase bias corrections with a precision of better than 2 cm.

  15. Surface-water-quality assessment of the upper Illinois River Basin in Illinois, Indiana, and Wisconsin; fixed-station network and selected water-quality data for April 1987-September 1990

    USGS Publications Warehouse

    Sullivan, Daniel J.; Blanchard, Stephen F.

    1994-01-01

    This report describes and presents the sampling design, methods, quality assurance methods and results, and information on how to obtain data collected at eight fixed stations in the upper Illinois River Basin as part of the pilot phase of the National Water-Quality Assessment program. Data were collected monthly from April 1987-August l990; these data were supplemented with data collected during special events, including high and low flows. Each fixed station represents a cross section at which the transport of selected dissolved and suspended materials can be computed. Samples collected monthly and during special events were analyzed for concentrations of major ions, nutrients, trace elements, organic carbon, chlorophyll-a, suspended sediment, and other constituents. Field measurements of water temperature, pH, dissolved oxygen, specific conductance, and indicator bacteria also were made at each site. Samples of suspended sediment were analyzed for concentrations of major ions and trace elements. In addition, samples were analyzed seasonally for concentrations of antimony, bromide, molybdenum, and the radionuclides gross alpha and gross beta.

  16. 47 CFR 101.133 - Limitations on use of transmitters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.133 Limitations on use of transmitters. (a...) Private operational fixed point-to-point microwave stations authorized in this service may communicate...-point microwave licenses may use the same transmitting equipment under the following terms and...

  17. 47 CFR 101.133 - Limitations on use of transmitters.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.133 Limitations on use of transmitters. (a...) Private operational fixed point-to-point microwave stations authorized in this service may communicate...-point microwave licenses may use the same transmitting equipment under the following terms and...

  18. 47 CFR 101.133 - Limitations on use of transmitters.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.133 Limitations on use of transmitters. (a...) Private operational fixed point-to-point microwave stations authorized in this service may communicate...-point microwave licenses may use the same transmitting equipment under the following terms and...

  19. 47 CFR 101.133 - Limitations on use of transmitters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.133 Limitations on use of transmitters. (a...) Private operational fixed point-to-point microwave stations authorized in this service may communicate...-point microwave licenses may use the same transmitting equipment under the following terms and...

  20. 47 CFR 101.133 - Limitations on use of transmitters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES FIXED MICROWAVE SERVICES Technical Standards § 101.133 Limitations on use of transmitters. (a...) Private operational fixed point-to-point microwave stations authorized in this service may communicate...-point microwave licenses may use the same transmitting equipment under the following terms and...

  1. Comparison between multi-constellation ambiguity-fixed PPP and RTK for maritime precise navigation

    NASA Astrophysics Data System (ADS)

    Tegedor, Javier; Liu, Xianglin; Ørpen, Ole; Treffers, Niels; Goode, Matthew; Øvstedal, Ola

    2015-06-01

    In order to achieve high-accuracy positioning, either Real-Time Kinematic (RTK) or Precise Point Positioning (PPP) techniques can be used. While RTK normally delivers higher accuracy with shorter convergence times, PPP has been an attractive technology for maritime applications, as it delivers uniform positioning performance without the direct need of a nearby reference station. Traditional PPP has been based on ambiguity-­float solutions using GPS and Glonass constellations. However, the addition of new satellite systems, such as Galileo and BeiDou, and the possibility of fixing integer carrier-phase ambiguities (PPP-AR) allow to increase PPP accuracy. In this article, a performance assessment has been done between RTK, PPP and PPP-AR, using GNSS data collected from two antennas installed on a ferry navigating in Oslo (Norway). RTK solutions have been generated using short, medium and long baselines (up to 290 km). For the generation of PPP-AR solutions, Uncalibrated Hardware Delays (UHDs) for GPS, Galileo and BeiDou have been estimated using reference stations in Oslo and Onsala. The performance of RTK and multi-­constellation PPP and PPP-AR are presented.

  2. Applications of laser ranging and VLBI observations for selenodetic control

    NASA Technical Reports Server (NTRS)

    Fajemirokun, F. A.

    1971-01-01

    The observation equations necessary to utilize lunar laser ranging and very long baseline interferometry measurements were developed for the establishment of a primary control network on the moon. The network consists of coordinates of moon points in the selenodetic Cartesian coordinate system, which is fixed to the lunar body, oriented along the three principal axes of inertia of the moon, and centered at the lunar center of mass. The observation equations derived are based on a general model in which the unknown parameters included: the selenodetic Cartesian coordinates, the geocentric coordinates of earth stations, parameters of the orientation of the selenodetic coordinate system with respect to a fixed celestial system, the parameters of the orientation of the average terrestrial coordinate system with respect to a fixed celestial coordinate system, and the geocentric coordinates of the center of mass of the moon, given by a lunar ephemeris.

  3. 47 CFR 1.903 - Authorization required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Wireless Radio Services... the Wireless Radio Services must be used and operated only in accordance with the rules applicable to... operate mobile or fixed stations in the Wireless Radio Services, except for certain stations in the Rural...

  4. 47 CFR 87.171 - Class of station symbols.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES... the aviation services are: Symbol and class of station AX—Aeronautical fixed AXO—Aeronautical...—Aeronautical search and rescue FAS—Aviation support FAT—Flight test FAW—Automatic weather observation GCO...

  5. 78 FR 34309 - Petition for Reconsideration of Action in Rulemaking Proceeding

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... Earth Stations Aboard Aircraft Communicating with Fixed-Satellite Service Geostationary-Orbit Space Stations Operating in the 10.95-11.2 GHz, 11.45-11.7 GHz, 11.7-12.2 GHz and 14.0-14.5 GHz Frequency Bands...

  6. 47 CFR 101.819 - Stations affected by coordination contour procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Stations affected by coordination contour procedures. 101.819 Section 101.819 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.819...

  7. 47 CFR 101.819 - Stations affected by coordination contour procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Stations affected by coordination contour procedures. 101.819 Section 101.819 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.819...

  8. 47 CFR 101.819 - Stations affected by coordination contour procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Stations affected by coordination contour procedures. 101.819 Section 101.819 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.819...

  9. 47 CFR 101.7 - Eligibility for station license.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Eligibility for station license. 101.7 Section 101.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.7 Eligibility...

  10. 47 CFR 101.819 - Stations affected by coordination contour procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Stations affected by coordination contour procedures. 101.819 Section 101.819 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.819...

  11. 47 CFR 101.7 - Eligibility for station license.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Eligibility for station license. 101.7 Section 101.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.7 Eligibility...

  12. 47 CFR 101.819 - Stations affected by coordination contour procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Stations affected by coordination contour procedures. 101.819 Section 101.819 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.819...

  13. 47 CFR 101.7 - Eligibility for station license.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Eligibility for station license. 101.7 Section 101.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.7 Eligibility...

  14. 47 CFR 101.7 - Eligibility for station license.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Eligibility for station license. 101.7 Section 101.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.7 Eligibility...

  15. 47 CFR 101.7 - Eligibility for station license.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Eligibility for station license. 101.7 Section 101.7 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.7 Eligibility...

  16. Performance Assessment in the PILOT Experiment On Board Space Stations Mir and ISS.

    PubMed

    Johannes, Bernd; Salnitski, Vyacheslav; Dudukin, Alexander; Shevchenko, Lev; Bronnikov, Sergey

    2016-06-01

    The aim of this investigation into the performance and reliability of Russian cosmonauts in hand-controlled docking of a spacecraft on a space station (experiment PILOT) was to enhance overall mission safety and crew training efficiency. The preliminary findings on the Mir space station suggested that a break in docking training of about 90 d significantly degraded performance. Intensified experiment schedules on the International Space Station (ISS) have allowed for a monthly experiment using an on-board simulator. Therefore, instead of just three training tasks as on Mir, five training flights per session have been implemented on the ISS. This experiment was run in parallel but independently of the operational docking training the cosmonauts receive. First, performance was compared between the experiments on the two space stations by nonparametric testing. Performance differed significantly between space stations preflight, in flight, and postflight. Second, performance was analyzed by modeling the linear mixed effects of all variances (LME). The fixed factors space station, mission phases, training task numbers, and their interaction were analyzed. Cosmonauts were designated as a random factor. All fixed factors were found to be significant and the interaction between stations and mission phase was also significant. In summary, performance on the ISS was shown to be significantly improved, thus enhancing mission safety. Additional approaches to docking performance assessment and prognosis are presented and discussed.

  17. Satellite laser ranging to low Earth orbiters: orbit and network validation

    NASA Astrophysics Data System (ADS)

    Arnold, Daniel; Montenbruck, Oliver; Hackel, Stefan; Sośnica, Krzysztof

    2018-04-01

    Satellite laser ranging (SLR) to low Earth orbiters (LEOs) provides optical distance measurements with mm-to-cm-level precision. SLR residuals, i.e., differences between measured and modeled ranges, serve as a common figure of merit for the quality assessment of orbits derived by radiometric tracking techniques. We discuss relevant processing standards for the modeling of SLR observations and highlight the importance of line-of-sight-dependent range corrections for the various types of laser retroreflector arrays. A 1-3 cm consistency of SLR observations and GPS-based precise orbits is demonstrated for a wide range of past and present LEO missions supported by the International Laser Ranging Service (ILRS). A parameter estimation approach is presented to investigate systematic orbit errors and it is shown that SLR validation of LEO satellites is not only able to detect radial but also along-track and cross-track offsets. SLR residual statistics clearly depend on the employed precise orbit determination technique (kinematic vs. reduced-dynamic, float vs. fixed ambiguities) but also reveal pronounced differences in the ILRS station performance. Using the residual-based parameter estimation approach, corrections to ILRS station coordinates, range biases, and timing offsets are derived. As a result, root-mean-square residuals of 5-10 mm have been achieved over a 1-year data arc in 2016 using observations from a subset of high-performance stations and ambiguity-fixed orbits of four LEO missions. As a final contribution, we demonstrate that SLR can not only validate single-satellite orbit solutions but also precise baseline solutions of formation flying missions such as GRACE, TanDEM-X, and Swarm.

  18. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  19. 47 CFR 101.805 - Assignment of frequencies to mobile stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Assignment of frequencies to mobile stations. 101.805 Section 101.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.805 Assignment...

  20. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  1. 47 CFR 101.805 - Assignment of frequencies to mobile stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Assignment of frequencies to mobile stations. 101.805 Section 101.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.805 Assignment...

  2. 47 CFR 101.805 - Assignment of frequencies to mobile stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Assignment of frequencies to mobile stations. 101.805 Section 101.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.805 Assignment...

  3. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  4. 47 CFR 101.805 - Assignment of frequencies to mobile stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Assignment of frequencies to mobile stations. 101.805 Section 101.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.805 Assignment...

  5. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  6. 47 CFR 101.817 - Notification of station operation at temporary locations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Notification of station operation at temporary locations. 101.817 Section 101.817 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.817...

  7. 47 CFR 101.805 - Assignment of frequencies to mobile stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Assignment of frequencies to mobile stations. 101.805 Section 101.805 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.805 Assignment...

  8. Reply to Rhines and Huybers: Changes in the Frequency of Extreme Summer Heat

    NASA Technical Reports Server (NTRS)

    Hansen, James; Sato, Makiko; Ruedy, Reto

    2013-01-01

    Rhines and Huybers are correct that the decreasing number of measurement stations in recent years contributed slightly to our calculated increase of extreme summer mean temperature anomalies. However, the increased frequency of extreme heat anomalies is accounted for mainly by (i) higher mean temperature of recent decades relative to the base period 1951-1980, and (ii) the continuing upward temperature trend during recent decades. The effect of decreasing stations is shown by comparing our prior analysis with results using only stations with data records in both the base period and recent years (Fig. 1). The distribution is noisier, and the area with temperature anomaly exceeding three SDs during 2001-2011 decreases from 9.6 to 9.3% for the reduced number of stations (1,886 rather than 6,147), but our conclusions are not changed qualitatively. The temperature anomaly distribution shifts to the right and broadens because it is defined relative to a fixed (1951-1980) base period, during which global temperatures were within the Holocene range. We argue on the basis of accelerating ice loss from Greenland and Antarctica and rapidly rising sea level (now exceeding 3 mm/y or 3 m per millennium) that temperatures in the early 21st century are already above the Holocene range, and thus use of a base period preceding the rapid warming of the past three decades has merit.

  9. 47 CFR 22.593 - Effective radiated power limits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Effective radiated power limits. 22.593 Section... power limits. The effective radiated power of fixed stations operating on the channels listed in § 22.591 must not exceed 150 Watts. The equivalent isotropically radiated power of existing fixed microwave...

  10. 46 CFR 113.37-5 - General requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... equipped with fixed pitch propellers must have on the navigating bridge and at the engineroom control station a propeller speed and direction indicator for each shaft. (b) A vessel equipped with controllable pitch propellers must have on the navigating bridge and at the engineroom control station a propeller...

  11. 46 CFR 113.37-5 - General requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... equipped with fixed pitch propellers must have on the navigating bridge and at the engineroom control station a propeller speed and direction indicator for each shaft. (b) A vessel equipped with controllable pitch propellers must have on the navigating bridge and at the engineroom control station a propeller...

  12. 46 CFR 113.37-5 - General requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... equipped with fixed pitch propellers must have on the navigating bridge and at the engineroom control station a propeller speed and direction indicator for each shaft. (b) A vessel equipped with controllable pitch propellers must have on the navigating bridge and at the engineroom control station a propeller...

  13. 47 CFR 25.208 - Power flux density limits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system... geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary... single non-geostationary-satellite orbit (NGSO) system operating in the Fixed-Satellite Service (FSS...

  14. 47 CFR 25.208 - Power flux density limits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... emissions from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system... point on the geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system, for all conditions...

  15. 47 CFR 25.208 - Power flux density limits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... emissions from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system... point on the geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system, for all conditions...

  16. 47 CFR 25.208 - Power flux density limits.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... emissions from all co-frequency space stations of a single non-geostationary-satellite orbit (NGSO) system... point on the geostationary satellite orbit (GSO) by the emissions from all co-frequency earth stations in a non-geostationary satellite orbit fixed-satellite service (NGSO FSS) system, for all conditions...

  17. 47 CFR 101.215 - Posting of station authorization and transmitter identification cards, plates, or signs.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Posting of station authorization and transmitter identification cards, plates, or signs. 101.215 Section 101.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational...

  18. 47 CFR 101.813 - Remote control operation of mobile television pickup stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Remote control operation of mobile television pickup stations. 101.813 Section 101.813 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101...

  19. 47 CFR 101.813 - Remote control operation of mobile television pickup stations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Remote control operation of mobile television pickup stations. 101.813 Section 101.813 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101...

  20. 47 CFR 101.215 - Posting of station authorization and transmitter identification cards, plates, or signs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Posting of station authorization and transmitter identification cards, plates, or signs. 101.215 Section 101.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational...

  1. 47 CFR 101.813 - Remote control operation of mobile television pickup stations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Remote control operation of mobile television pickup stations. 101.813 Section 101.813 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101...

  2. 47 CFR 101.813 - Remote control operation of mobile television pickup stations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Remote control operation of mobile television pickup stations. 101.813 Section 101.813 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101...

  3. 47 CFR 101.215 - Posting of station authorization and transmitter identification cards, plates, or signs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Posting of station authorization and transmitter identification cards, plates, or signs. 101.215 Section 101.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational...

  4. 47 CFR 101.215 - Posting of station authorization and transmitter identification cards, plates, or signs.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Posting of station authorization and transmitter identification cards, plates, or signs. 101.215 Section 101.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational...

  5. 47 CFR 101.813 - Remote control operation of mobile television pickup stations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Remote control operation of mobile television pickup stations. 101.813 Section 101.813 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101...

  6. 47 CFR 101.215 - Posting of station authorization and transmitter identification cards, plates, or signs.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Posting of station authorization and transmitter identification cards, plates, or signs. 101.215 Section 101.215 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Operational...

  7. 47 CFR 101.1421 - Coordination of adjacent area MVDDS stations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Multichannel Video Distribution and Data Service Rules for... compatible with adjacent and co-channel operations in the adjacent areas on all its frequencies; and (2... adjacent and co-channel operations in adjacent areas. (b) Harmful interference to public safety stations...

  8. 47 CFR 1.981 - Reports, annual and semiannual.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Random Selection Wireless Radio Services Applications and Proceedings Reports to Be Filed with the... who have entered into agreements with other persons for the cooperative use of radio station... Aeronautical Fixed Radio Station Licensees Source: 78 FR 41321, July 10, 2013, as amended at 78 FR 44028, July...

  9. 47 CFR 1.981 - Reports, annual and semiannual.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Random Selection Wireless Radio Services Applications and Proceedings Reports to Be Filed with the... who have entered into agreements with other persons for the cooperative use of radio station... Aeronautical Fixed Radio Station Licensees Source: 78 FR 41321, July 10, 2013, as amended at 78 FR 44028, July...

  10. 47 CFR 78.105 - Antenna systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Antenna systems. 78.105 Section 78.105... SERVICE Technical Regulations § 78.105 Antenna systems. (a) For fixed stations operating in the 12.7-13.2... directional antennas that meet the performance standards indicated in the following table. (i) Stations must...

  11. 47 CFR 78.105 - Antenna systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Antenna systems. 78.105 Section 78.105... SERVICE Technical Regulations § 78.105 Antenna systems. (a) For fixed stations operating in the 12.7-13.2... directional antennas that meet the performance standards indicated in the following table. (i) Stations must...

  12. 47 CFR 78.105 - Antenna systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Antenna systems. 78.105 Section 78.105... SERVICE Technical Regulations § 78.105 Antenna systems. (a) For fixed stations operating in the 12.7-13.2... directional antennas that meet the performance standards indicated in the following table. (i) Stations must...

  13. 47 CFR 78.105 - Antenna systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Antenna systems. 78.105 Section 78.105... SERVICE Technical Regulations § 78.105 Antenna systems. (a) For fixed stations operating in the 12.7-13.2... directional antennas that meet the performance standards indicated in the following table. (i) Stations must...

  14. 46 CFR 184.610 - Public address systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... public address system must be a fixed installation and be audible during normal operating conditions... system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in... passengers, a public address system is not required if a public announcement made from operating station...

  15. 47 CFR 2.302 - Call signs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... station may continue to be used by that station. The same exception applies also to frequency modulation... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL FREQUENCY ALLOCATIONS AND RADIO TREATY MATTERS; GENERAL... frequencies above 30 MHz) KAA20 through KZZ99. WAA20 through WZZ99. WZZ200 through WZZ999. Fixed 3 letters, 2...

  16. 47 CFR 101.151 - Use of signal boosters.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... 47 Telecommunication 5 2012-10-01 2012-10-01 false Use of signal boosters. 101.151 Section 101.151... SERVICES Technical Standards § 101.151 Use of signal boosters. Private operational-fixed licensees...

  17. 47 CFR 101.151 - Use of signal boosters.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... 47 Telecommunication 5 2013-10-01 2013-10-01 false Use of signal boosters. 101.151 Section 101.151... SERVICES Technical Standards § 101.151 Use of signal boosters. Private operational-fixed licensees...

  18. 47 CFR 101.151 - Use of signal boosters.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... 47 Telecommunication 5 2010-10-01 2010-10-01 false Use of signal boosters. 101.151 Section 101.151... SERVICES Technical Standards § 101.151 Use of signal boosters. Private operational-fixed licensees...

  19. 47 CFR 101.151 - Use of signal boosters.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... 47 Telecommunication 5 2014-10-01 2014-10-01 false Use of signal boosters. 101.151 Section 101.151... SERVICES Technical Standards § 101.151 Use of signal boosters. Private operational-fixed licensees...

  20. 47 CFR 101.151 - Use of signal boosters.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., or portable station(s). The booster will fill in only weak signal areas and cannot extend the system... 47 Telecommunication 5 2011-10-01 2011-10-01 false Use of signal boosters. 101.151 Section 101.151... SERVICES Technical Standards § 101.151 Use of signal boosters. Private operational-fixed licensees...

  1. 47 CFR 87.171 - Class of station symbols.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... systems AXO—Aeronautical operational fixed DGP—Differential GPS DLT—Aircraft data link land test FA...—Radionavigation land test RLW—Microwave landing system RNV—Radio Navigation Land/DME RPC—Ramp Control TJ—Aircraft earth station in the Aeronautical Mobile-Satellite Service UAT—Universal Access Transceiver [53 FR 28940...

  2. KSC-00dig069

    NASA Image and Video Library

    2000-10-31

    Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  3. KSC-00dig068

    NASA Image and Video Library

    2000-10-31

    Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was stalled several hours to fix a broken cleat on the crawler-transporter. To the left is the Rotating Service Structure. The Orbiter Access Arm is already extended from the Fixed Service Structure to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  4. ACTS Ka-Band Earth Stations: Technology, Performance, and Lessons Learned

    NASA Technical Reports Server (NTRS)

    Reinhart, Richard C.; Struharik, Steven J.; Diamond, John J.; Stewart, David

    2000-01-01

    The Advanced Communications Technology Satellite (ACTS) Project invested heavily in prototype Ka-band satellite ground terminals to conduct an experiments program with the ACTS satellite. The ACTS experiment's program proposed to validate Ka-band satellite and ground station technology. demonstrate future telecommunication services. demonstrate commercial viability and market acceptability of these new services, evaluate system networking and processing technology, and characterize Ka-band propagation effects, including development of techniques to mitigate signal fading. This paper will present a summary of the fixed ground terminals developed by the NASA Glenn Research Center and its industry partners, emphasizing the technology and performance of the terminals (Part 1) and the lessons learned throughout their six year operation including the inclined orbit phase of operations (Full Report). An overview of the Ka-band technology and components developed for the ACTS ground stations is presented. Next. the performance of the ground station technology and its evolution during the ACTS campaign are discussed to illustrate the technical tradeoffs made during the program and highlight technical advances by industry to support the ACTS experiments program and terminal operations. Finally. lessons learned during development and operation of the user terminals are discussed for consideration of commercial adoption into future Ka-band systems. The fixed ground stations used for experiments by government, academic, and commercial entities used reflector based offset-fed antenna systems ranging in size from 0.35m to 3.4m antenna diameter. Gateway earth stations included two systems, referred to as the NASA Ground Station (NGS) and the Link Evaluation Terminal (LET). The NGS provides tracking, telemetry, and control (TT&C) and Time Division Multiple Access (TDMA) network control functions. The LET supports technology verification and high data rate experiments. The ground stations successfully demonstrated many services and applications at Ka-band in three different modes of operation: circuit switched TDMA using the satellite on-board processor, satellite switched SS-TDMA applications using the on-board Microwave Switch Matrix (MSM), and conventional transponder (bent-pipe) operation. Data rates ranged from 4.8 kbps up to 622 Mbps. Experiments included: 1) low rate (4.8- 1 00's kbps) remote data acquisition and control using small earth stations, 2) moderate rate (1-45 Mbps) experiments included full duplex voice and video conferencing and both full duplex and asymmetric data rate protocol and network evaluation using mid-size ground stations, and 3) link characterization experiments and high data rate (155-622 Mbps) terrestrial and satellite interoperability application experiments conducted by a consortium of experimenters using the large transportable ground stations.

  5. Ionospheric modelling to boost the PPP-RTK positioning and navigation in Australia

    NASA Astrophysics Data System (ADS)

    Arsov, Kirco; Terkildsen, Michael; Olivares, German

    2017-04-01

    This paper deals with implementation of 3-D ionospheric model to support the GNSS positioning and navigation activities in Australia. We will introduce two strategies for Slant Total Electron Content (STEC) estimation from GNSS CORS sites in Australia. In the first scenario, the STEC is estimated in the PPP-RTK network processing. The ionosphere is estimated together with other GNSS network parameters, such as Satellite Clocks, Satellite Phase Biases, etc. Another approach is where STEC is estimated on a station by station basis by taking advantage of already known station position and different satellite ambiguities relations. Accuracy studies and considerations will be presented and discussed. Furthermore, based on this STEC, 3-D ionosphere modeling will be performed. We will present the simple interpolation, 3-D Tomography and bi-cubic splines as modeling techniques. In order to assess these models, a (user) PPP-RTK test bed is established and a sensitivity matrix will be introduced and analyzed based on time to first fix (TTFF) of ambiguities, positioning accuracy, PPP-RTK solution convergence time etc. Different spatial configurations and constellations will be presented and assessed.

  6. 47 CFR 25.210 - Technical requirements for space stations in the Fixed-Satellite Service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Fixed-Satellite Service. 25.210 Section 25.210 Telecommunication FEDERAL COMMUNICATIONS COMMISSION.../30 GHz band shall employ state-of-the-art full frequency reuse either through the use of orthogonal polarizations within the same beam and/or through the use of spatially independent beams. (e) [Reserved] (f) All...

  7. 47 CFR 25.210 - Technical requirements for space stations in the Fixed-Satellite Service.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the Fixed-Satellite Service. 25.210 Section 25.210 Telecommunication FEDERAL COMMUNICATIONS COMMISSION.../30 GHz band shall employ state-of-the-art full frequency reuse either through the use of orthogonal polarizations within the same beam and/or through the use of spatially independent beams. (e) [Reserved] (f) All...

  8. 47 CFR 25.210 - Technical requirements for space stations in the Fixed-Satellite Service.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the Fixed-Satellite Service. 25.210 Section 25.210 Telecommunication FEDERAL COMMUNICATIONS COMMISSION.../30 GHz band shall employ state-of-the-art full frequency reuse either through the use of orthogonal polarizations within the same beam and/or through the use of spatially independent beams. (e) [Reserved] (f) All...

  9. Impact of orbit modeling on DORIS station position and Earth rotation estimates

    NASA Astrophysics Data System (ADS)

    Štěpánek, Petr; Rodriguez-Solano, Carlos Javier; Hugentobler, Urs; Filler, Vratislav

    2014-04-01

    The high precision of estimated station coordinates and Earth rotation parameters (ERP) obtained from satellite geodetic techniques is based on the precise determination of the satellite orbit. This paper focuses on the analysis of the impact of different orbit parameterizations on the accuracy of station coordinates and the ERPs derived from DORIS observations. In a series of experiments the DORIS data from the complete year 2011 were processed with different orbit model settings. First, the impact of precise modeling of the non-conservative forces on geodetic parameters was compared with results obtained with an empirical-stochastic modeling approach. Second, the temporal spacing of drag scaling parameters was tested. Third, the impact of estimating once-per-revolution harmonic accelerations in cross-track direction was analyzed. And fourth, two different approaches for solar radiation pressure (SRP) handling were compared, namely adjusting SRP scaling parameter or fixing it on pre-defined values. Our analyses confirm that the empirical-stochastic orbit modeling approach, which does not require satellite attitude information and macro models, results for most of the monitored station parameters in comparable accuracy as the dynamical model that employs precise non-conservative force modeling. However, the dynamical orbit model leads to a reduction of the RMS values for the estimated rotation pole coordinates by 17% for x-pole and 12% for y-pole. The experiments show that adjusting atmospheric drag scaling parameters each 30 min is appropriate for DORIS solutions. Moreover, it was shown that the adjustment of cross-track once-per-revolution empirical parameter increases the RMS of the estimated Earth rotation pole coordinates. With recent data it was however not possible to confirm the previously known high annual variation in the estimated geocenter z-translation series as well as its mitigation by fixing the SRP parameters on pre-defined values.

  10. 47 CFR 87.279 - Frequencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Aeronautical Fixed Stations § 87.279 Frequencies. (a) United States (except Alaska). The applicant must request... in § 87.263(c). kHz 2648.0 5310.0 4645.0 5887.5 4947.5 8015.0 5122.5 (c) Gulf of Mexico. In addition... available in the Gulf of Mexico. Aircraft Data Link Land Test Stations ...

  11. 47 CFR 80.477 - AMTS points of communication.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... waters of the Gulf of Mexico, with ship stations, and with land units in accordance with § 80.123. (b) AMTS licensees in the offshore waters of the Gulf of Mexico may use AMTS coast and ship station... use AMTS coast and ship frequencies on a secondary basis for fixed service communications to support...

  12. 47 CFR 80.477 - AMTS points of communication.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... waters of the Gulf of Mexico, with ship stations, and with land units in accordance with § 80.123. (b) AMTS licensees in the offshore waters of the Gulf of Mexico may use AMTS coast and ship station... use AMTS coast and ship frequencies on a secondary basis for fixed service communications to support...

  13. 47 CFR 80.477 - AMTS points of communication.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... waters of the Gulf of Mexico, with ship stations, and with land units in accordance with § 80.123. (b) AMTS licensees in the offshore waters of the Gulf of Mexico may use AMTS coast and ship station... use AMTS coast and ship frequencies on a secondary basis for fixed service communications to support...

  14. 47 CFR 80.477 - AMTS points of communication.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... waters of the Gulf of Mexico, with ship stations, and with land units in accordance with § 80.123. (b) AMTS licensees in the offshore waters of the Gulf of Mexico may use AMTS coast and ship station... use AMTS coast and ship frequencies on a secondary basis for fixed service communications to support...

  15. 47 CFR 2.108 - Policy regarding the use of the fixed-satellite allocations in the 3.6-3.7, 4.5-4.8, and 5.85-5...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... with all users of the bands. It is anticipated that one earth station on each coast can be successfully coordinated. Specific locations of these earth stations depend upon service requirements and case-by-case EMC...

  16. 47 CFR 2.108 - Policy regarding the use of the fixed-satellite allocations in the 3.6-3.7, 4.5-4.8, and 5.85-5...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with all users of the bands. It is anticipated that one earth station on each coast can be successfully coordinated. Specific locations of these earth stations depend upon service requirements and case-by-case EMC...

  17. Data Gathering and Energy Transfer Dilemma in UAV-Assisted Flying Access Network for IoT.

    PubMed

    Arabi, Sara; Sabir, Essaid; Elbiaze, Halima; Sadik, Mohamed

    2018-05-11

    Recently, Unmanned Aerial Vehicles (UAVs) have emerged as an alternative solution to assist wireless networks, thanks to numerous advantages they offer in comparison to terrestrial fixed base stations. For instance, a UAV can be used to embed a flying base station providing an on-demand nomadic access to network services. A UAV can also be used to wirelessly recharge out-of-battery ground devices. In this paper, we aim to deal with both data collection and recharging depleted ground Internet-of-Things (IoT) devices through a UAV station used as a flying base station. To extend the network lifetime, we present a novel use of UAV with energy harvesting module and wireless recharging capabilities. However, the UAV is used as an energy source to empower depleted IoT devices. On one hand, the UAV charges depleted ground IoT devices under three policies: (1) low-battery first scheme; (2) high-battery first scheme; and (3) random scheme. On the other hand, the UAV station collects data from IoT devices that have sufficient energy to transmit their packets, and in the same phase, the UAV exploits the Radio Frequency (RF) signals transmitted by IoT devices to extract and harvest energy. Furthermore, and as the UAV station has a limited coverage time due to its energy constraints, we propose and investigate an efficient trade-off between ground users recharging time and data gathering time. Furthermore, we suggest to control and optimize the UAV trajectory in order to complete its travel within a minimum time, while minimizing the energy spent and/or enhancing the network lifetime. Extensive numerical results and simulations show how the system behaves under different scenarios and using various metrics in which we examine the added value of UAV with energy harvesting module.

  18. Aerodynamic characteristics of a distinct wing-body configuration at Mach 6: Experiment, theory, and the hypersonic isolation principle

    NASA Technical Reports Server (NTRS)

    Penland, J. A.; Pittman, J. L.

    1985-01-01

    An experimental investigation has been conducted to determine the effect of wing leading edge sweep and wing translation on the aerodynamic characteristics of a wing body configuration at a free stream Mach number of about 6 and Reynolds number (based on body length) of 17.9 x 10 to the 6th power. Seven wings with leading edge sweep angles from -20 deg to 60 deg were tested on a common body over an angle of attack range from -12 deg to 10 deg. All wings had a common span, aspect ratio, taper ratio, planform area, and thickness ratio. Wings were translated longitudinally on the body to make tests possible with the total and exposed mean aerodynamic chords located at a fixed body station. Aerodynamic forces were found to be independent of wing sweep and translation, and pitching moments were constant when the exposed wing mean aerodynamic chord was located at a fixed body station. Thus, the Hypersonic Isolation Principle was verified. Theory applied with tangent wedge pressures on the wing and tangent cone pressures on the body provided excellent predictions of aerodynamic force coefficients but poor estimates of moment coefficients.

  19. STS-36 crewmembers train in JSC's FB shuttle mission simulator (SMS)

    NASA Technical Reports Server (NTRS)

    1989-01-01

    STS-36 Mission Specialist (MS) David C. Hilmers, seated on the aft flight deck, discusses procedures with Commander John O. Creighton (left) and Pilot John H. Casper during a simulation in JSC's Fixed Based (FB) Shuttle Mission Simulator (SMS). Casper reviews a checklist at the pilots station on the forward flight deck. The crewmembers are rehearsing crew cabin activities for their upcoming Department of Defense (DOD) mission aboard Atlantis, Orbiter Vehicle (OV) 104.

  20. Development and validation of the crew-station system-integration research facility

    NASA Technical Reports Server (NTRS)

    Nedell, B.; Hardy, G.; Lichtenstein, T.; Leong, G.; Thompson, D.

    1986-01-01

    The various issues associated with the use of integrated flight management systems in aircraft were discussed. To address these issues a fixed base integrated flight research (IFR) simulation of a helicopter was developed to support experiments that contribute to the understanding of design criteria for rotorcraft cockpits incorporating advanced integrated flight management systems. A validation experiment was conducted that demonstrates the main features of the facility and the capability to conduct crew/system integration research.

  1. Case study of a central-station grid-intertie photovoltaic system with V-trough concentration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freilich, J.; Gordon, J.M.

    1991-01-01

    This presentation is a cast study of an installed, central-station (no storage), utility-intertie photovoltaic (PV) system in Sede Boqer, Israel (latitude 30.9{degree}N). The nominally 12 kW peak PV system is comprised of 189 polycrystalline silicon modules mounted on inexpensive, one-axis north-south horizontal trackers with V-trough mirrors for optical boost. The power conditioning unit operates at a fixed voltage rather than at maximum power point (MPP). The primary task in analyzing the installed system was to investigate the cause of measured power output significantly below the design predictions of the installers, and to recommend system design modifications. Subsequent tasks included themore » quantitative assessment of fixed-voltage operation and of the energetic value of V-trough concentration and one-axis tracking for this system. Sample results show: (1) fixed-voltage operation at the best fixed voltage (BFV) can achieve around 96% of the yearly energy of MPP operation; (2) the sensitivity of the yearly energy delivery to the selection of fixed voltage and its marked asymmetry about the BFV; (3) the influences of inverter current constraints on yearly energy delivery and BFV; and (4) how the separate effects of tracking and optical concentration increase yearly energy delivery.« less

  2. Combined GPS/GLONASS Precise Point Positioning with Fixed GPS Ambiguities

    PubMed Central

    Pan, Lin; Cai, Changsheng; Santerre, Rock; Zhu, Jianjun

    2014-01-01

    Precise point positioning (PPP) technology is mostly implemented with an ambiguity-float solution. Its performance may be further improved by performing ambiguity-fixed resolution. Currently, the PPP integer ambiguity resolutions (IARs) are mainly based on GPS-only measurements. The integration of GPS and GLONASS can speed up the convergence and increase the accuracy of float ambiguity estimates, which contributes to enhancing the success rate and reliability of fixing ambiguities. This paper presents an approach of combined GPS/GLONASS PPP with fixed GPS ambiguities (GGPPP-FGA) in which GPS ambiguities are fixed into integers, while all GLONASS ambiguities are kept as float values. An improved minimum constellation method (MCM) is proposed to enhance the efficiency of GPS ambiguity fixing. Datasets from 20 globally distributed stations on two consecutive days are employed to investigate the performance of the GGPPP-FGA, including the positioning accuracy, convergence time and the time to first fix (TTFF). All datasets are processed for a time span of three hours in three scenarios, i.e., the GPS ambiguity-float solution, the GPS ambiguity-fixed resolution and the GGPPP-FGA resolution. The results indicate that the performance of the GPS ambiguity-fixed resolutions is significantly better than that of the GPS ambiguity-float solutions. In addition, the GGPPP-FGA improves the positioning accuracy by 38%, 25% and 44% and reduces the convergence time by 36%, 36% and 29% in the east, north and up coordinate components over the GPS-only ambiguity-fixed resolutions, respectively. Moreover, the TTFF is reduced by 27% after adding GLONASS observations. Wilcoxon rank sum tests and chi-square two-sample tests are made to examine the significance of the improvement on the positioning accuracy, convergence time and TTFF. PMID:25237901

  3. Risk management policies and practices regarding radio frequency electromagnetic fields: results from a WHO survey.

    PubMed

    Dhungel, Amit; Zmirou-Navier, Denis; van Deventer, Emilie

    2015-04-01

    This study aims to describe current risk management practices and policies across the world in relation to personal exposures from devices emitting radiofrequency fields, environmental exposures from fixed installations and exposures in the work environment. Data from 86 countries representing all WHO regions were collected through a survey. The majority of countries (76.8 %) had set exposure limits for mobile devices, almost all (90.7 %) had set public exposure limits for fixed installations and 76.5 % had specified exposure limits for personnel in occupational settings. A number of other policies had been implemented at the national level, ranging from information provisions on how to reduce personal exposures and restrictions of usage for certain populations, such as children or pregnant women to prevention of access around base stations. This study suggests that countries with higher mobile subscriptions tend to have set radiofrequency exposure limits for mobile devices and to have provisions on exposure measurements about fixed installations. © The Author 2014. Published by Oxford University Press.

  4. 47 CFR 25.145 - Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... to the Commission a yearly report indicating the number of earth stations actually brought into...

  5. 47 CFR 25.145 - Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... to the Commission a yearly report indicating the number of earth stations actually brought into...

  6. 47 CFR 25.145 - Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 2 2011-10-01 2011-10-01 false Licensing conditions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... to the Commission a yearly report indicating the number of earth stations actually brought into...

  7. 47 CFR 25.145 - Licensing provisions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Licensing provisions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... to the Commission a yearly report indicating the number of earth stations actually brought into...

  8. 47 CFR 25.145 - Licensing provisions for the Fixed-Satellite Service in the 20/30 GHz bands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Licensing provisions for the Fixed-Satellite Service in the 20/30 GHz bands. 25.145 Section 25.145 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... indicating the number of earth stations actually brought into service under its blanket licensing authority...

  9. Human performance capabilities in a simulated space station-like environment. 1: Fixed beam luminance and location

    NASA Technical Reports Server (NTRS)

    Haines, R. F.; Bartz, A. E.; Zahn, J. R.

    1972-01-01

    The effects of a fixed, intense, one-foot diameter beam of simulated sunlight imaged within the field of view, upon responses to a battery of visual, body balance and stability, eye-hand coordination, and mental tests were studied. Each subject's electrocardiogram and electro-oculograms (vertical and horizontal) were recorded throughout each two-hour testing period within the space-station-like environment. It is possible to say that both subjects adapted to the brightly illuminated white panels in approximately 30 seconds after their first exposure each day and thereafter did not experience ocular fatigue, eye strain, or other kinds of disturbances as a result of these viewing conditions.

  10. KSC00pp1637

    NASA Image and Video Library

    2000-10-31

    KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was delayed several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  11. KSC-00pp1637

    NASA Image and Video Library

    2000-10-31

    KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour finally rests on Launch Pad 39B after its rollout was delayed several hours to fix a broken cleat on the crawler-transporter. At the far left is the Rotating Service Structure. From the Fixed Service Structure, the Orbiter Access Arm is already extended to the orbiter. Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  12. Lymph node pick up by separate stations: Option or necessity.

    PubMed

    Morgagni, Paolo; Nanni, Oriana; Carretta, Elisa; Altini, Mattia; Saragoni, Luca; Falcini, Fabio; Garcea, Domenico

    2015-05-27

    To evaluate whether lymph node pick up by separate stations could be an indicator of patients submitted to appropriate surgical treatment. One thousand two hundred and three consecutive gastric cancer patients submitted to radical resection in 7 general hospitals and for whom no information was available on the extension of lymphatic dissection were included in this retrospective study. Patients were divided into 2 groups: group A, where the stomach specimen was directly formalin-fixed and sent to the pathologist, and group B, where lymph nodes were picked up after surgery and fixed for separate stations. Sixty-two point three percent of group A patients showed < 16 retrieved lymph nodes compared to 19.4% of group B (P < 0.0001). Group B (separate stations) patients had significantly higher survival rates than those in group A [46.1 mo (95%CI: 36.5-56.0) vs 27.7 mo (95%CI: 21.3-31.9); P = 0.0001], independently of T or N stage. In multivariate analysis, group A also showed a higher risk of death than group B (HR = 1.24; 95%CI: 1.05-1.46). Separate lymphatic station dissection increases the number of retrieved nodes, leads to better tumor staging, and permits verification of the surgical dissection. The number of dissected stations could potentially be used as an index to evaluate the quality of treatment received.

  13. Weighted triangulation adjustment

    USGS Publications Warehouse

    Anderson, Walter L.

    1969-01-01

    The variation of coordinates method is employed to perform a weighted least squares adjustment of horizontal survey networks. Geodetic coordinates are required for each fixed and adjustable station. A preliminary inverse geodetic position computation is made for each observed line. Weights associated with each observed equation for direction, azimuth, and distance are applied in the formation of the normal equations in-the least squares adjustment. The number of normal equations that may be solved is twice the number of new stations and less than 150. When the normal equations are solved, shifts are produced at adjustable stations. Previously computed correction factors are applied to the shifts and a most probable geodetic position is found for each adjustable station. Pinal azimuths and distances are computed. These may be written onto magnetic tape for subsequent computation of state plane or grid coordinates. Input consists of punch cards containing project identification, program options, and position and observation information. Results listed include preliminary and final positions, residuals, observation equations, solution of the normal equations showing magnitudes of shifts, and a plot of each adjusted and fixed station. During processing, data sets containing irrecoverable errors are rejected and the type of error is listed. The computer resumes processing of additional data sets.. Other conditions cause warning-errors to be issued, and processing continues with the current data set.

  14. Berthing simulator for space station and orbiter

    NASA Technical Reports Server (NTRS)

    Veerasamy, Sam

    1991-01-01

    The development of a real-time man-in-the-loop berthing simulator is in progress at NASA Lyndon B. Johnson Space Center (JSC) to conduct a parametric study and to measure forces during contact conditions of the actual docking mechanisms for the Space Station Freedom and the orbiter. In berthing, the docking ports of the Space Station and the orbiter are brought together using the orbiter robotic arm to control the relative motion of the vehicles. The berthing simulator consists of a dynamics docking test system (DDTS), computer system, simulator software, and workstations. In the DDTS, the Space Station, and the orbiter docking mechanisms are mounted on a six-degree-of-freedom (6 DOF) table and a fixed platform above the table. Six load cells are used on the fixed platform to measure forces during contact conditions of the docking mechanisms. Two Encore Concept 32/9780 computers are used to simulate the orbiter robotic arm and to operate the berthing simulator. A systematic procedure for a real-time dynamic initialization is being developed to synchronize the Space Station docking port trajectory with the 6 DOF table movement. The berthing test can be conducted manually or automatically and can be extended for any two orbiting vehicles using a simulated robotic arm. The real-time operation of the berthing simulator is briefly described.

  15. USING A FISH INDEX TO ASSESS HABITAT QUALITY IN NARRAGANSETT BAY, RHODE ISLAND

    EPA Science Inventory

    We developed an estuarine index of biotic integrity to assess habitat quality in Narragansett Bay, Rhode Island. Fish were collected at 18 fixed stations with a 61-m x 3.05-m beach seine once per month in July and August from 1988 to 1999. Stations were designated high or low qua...

  16. USING A FISH INDEX TO ASSESS HABITAT QUALITY IN NARRAGANSETT BAY, RI: THE IMPORTANCE OF THE UPPER ESTUARY

    EPA Science Inventory

    We developed an estuarine index of biotic integrity to assess habitat quality in Narragansett Bay, Rhode Island. Fish were collected with a 61 X 3.05 m beach seine monthly in July and August from 1988-1999 at 18 fixed stations. Stations were designated high or low quality dependi...

  17. 47 CFR 1.1107 - Schedule of charges for applications and other filings for the international services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... services. Payment can be made electronically using the Commission's electronic filing and payment system...) Corres & 159 $1,130.00 CUT 3. Fixed Satellite Transmit/Receive Earth Stations: a. Initial Application... transmit/receive Earth Stations (2 meters or less operating in the 4/6 GHz frequency band): a. Lead...

  18. Modular Manufacturing Simulator: Users Manual

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Modular Manufacturing Simulator (MMS) has been developed for the beginning user of computer simulations. Consequently, the MMS cannot model complex systems that require branching and convergence logic. Once a user becomes more proficient in computer simulation and wants to add more complexity, the user is encouraged to use one of the many available commercial simulation systems. The (MMS) is based on the SSE5 that was developed in the early 1990's by the University of Alabama in Huntsville (UAH). A recent survey by MSFC indicated that the simulator has been a major contributor to the economic impact of the MSFC technology transfer program. Many manufacturers have requested additional features for the SSE5. Consequently, the following features have been added to the MMS that are not available in the SSE5: runs under Windows, print option for both input parameters and output statistics, operator can be fixed at a station or assigned to a group of stations, operator movement based on time limit, part limit, or work-in-process (WIP) limit at next station. The movement options for a moveable operators are: go to station with largest WIP, rabbit chase where operator moves in circular sequence between stations, and push/pull where operator moves back and forth between stations. This user's manual contains the necessary information for installing the MMS on a PC, a description of the various MMS commands, and the solutions to a number of sample problems using the MMS. Also included in the beginning of this report is a brief discussion of technology transfer.

  19. STS-44 Atlantis, OV-104, crewmembers participate in FB-SMS training at JSC

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-44 Atlantis, Orbiter Vehicle (OV) 104, Commander Frederick D. Gregory (left) and Pilot Terence T. Henricks, positioned at their appointed stations on the forward flight deck, are joined by Mission Specialist (MS) F. Story Musgrave (center) and MS James S. Voss (standing). The crewmembers are participating in a flight simulation in the Fixed Base (FB) Shuttle Mission Simulator (SMS) located in JSC's Mission Simulation and Training Facility Bldg 5. A maze of panel switches appear overhead and in the background.

  20. STS-29 Commander Coats in JSC fixed base (FB) shuttle mission simulator (SMS)

    NASA Image and Video Library

    1986-02-11

    S86-28458 (28 Feb. 1986) --- Astronaut Michael L. Coats participates in a rehearsal for his assigned flight at the commander's station of the Shuttle Mission Simulator (SMS) at the Johnson Space Center (JSC). NOTE: Coats, a veteran of spaceflight, originally trained for STS 61-H, which was cancelled in the wake of the Challenger accident. Following the Janaury 1986 accident he was named to serve on a mock crew (STS-61M) for personnel training and simulation purposes. Photo credit: NASA

  1. STS-44 Atlantis, OV-104, crewmembers participate in JSC FB-SMS training

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-44 Atlantis, Orbiter Vehicle (OV) 104, Commander Frederick D. Gregory and Pilot Terence T. Henricks are stationed at their appointed positions on the forward flight deck of the Fixed Base (FB) Shuttle Mission Simulator (SMS) in JSC's Mission Simulation and Training Facility Bldg 5. Gregory (left) in the commanders seat and Henricks (right) in the pilots seat look back toward aft flight deck and the photographer. Seat backs appear in the foreground and forward flight deck control panels in the background.

  2. Investigation of Plasma Phenomena in the Ionosphere Under Natural Conditions and Under Conditions Artificially Perturbed by HAARP

    DTIC Science & Technology

    2008-08-31

    fabricated, the concept was tested , and a number of design defects were discovered, a usual occurrence. The test board was modified with cuts and...jumper wires to correct the defects and continue testing until the design was verified. Based on the testing , new artwork was prepared. Note that...mobile data was roughly similar to the fixed station data. It also revealed a circuit design defect that required further testing at the Bellevue

  3. Fixed-Radius Point Counts in Forests: Factors Influencing Effectiveness and Efficiency

    Treesearch

    Daniel R. Petit; Lisa J. Petit; Victoria A. Saab; Thomas E. Martin

    1995-01-01

    The effectiveness of fixed-radius point counts in quantifying abundance and richness of bird species in oak-hickory, pine-hardwoods, mixed-mesophytic, beech-maple, and riparian cottonwood forests was evaluated in Arkansas, Ohio, Kentucky, and Idaho. Effects of count duration and numbers of stations and visits per stand were evaluated in May to July 1991 by conducting...

  4. Framework for a hydrologic climate-response network in New England

    USGS Publications Warehouse

    Lent, Robert M.; Hodgkins, Glenn A.; Dudley, Robert W.; Schalk, Luther F.

    2015-01-01

    Many climate-related hydrologic variables in New England have changed in the past century, and many are expected to change during the next century. It is important to understand and monitor these changes because they can affect human water supply, hydroelectric power generation, transportation infrastructure, and stream and riparian ecology. This report describes a framework for hydrologic monitoring in New England by means of a climate-response network. The framework identifies specific inland hydrologic variables that are sensitive to climate variation; identifies geographic regions with similar hydrologic responses; proposes a fixed-station monitoring network composed of existing streamflow, groundwater, lake ice, snowpack, and meteorological data-collection stations for evaluation of hydrologic response to climate variation; and identifies streamflow basins for intensive, process-based studies and for estimates of future hydrologic conditions.

  5. Korea Geodetic VLBI Station, Sejong

    NASA Technical Reports Server (NTRS)

    Donghyun, Baek; Sangoh, Yi; Hongjong, Oh; Sangchul, Han

    2013-01-01

    The Sejong VLBI station officially joined the IVS as a new Network Station in 2012. This report summarizes the activities of the Sejong station during 2012. The following are the activities at the station: 1) VLBI test observations were carried out with the Tsukuba 34-m antenna of the GSI in Japan. As a result, the Sejong antenna needs to improve its efficiency, which is currently in progress, 2) A survey to connect the VLBI reference point to GNSS and ground marks was conducted, and 3) To see the indirect effects of RFI (Radio Frequency Interference) at this place, we checked the omni-direction (AZ 0? to 360?, EL fixed at 7?) for RFI influence.

  6. Expedition Three crew poses for photo on Fixed Service structure

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The Expedition Three crew poses on the Fixed Service Structure at Launch Pad 39A. From left are cosmonaut Mikhail Tyurin, commander Frank Culbertson and cosmonaut Vladimir Nikolaevich Dezhurov. The STS-105 and Expedition Three crews are at Kennedy Space Center participating in a Terminal Countdown Demonstration Test, a dress rehearsal for launch. The activities include emergency egress training, a simulated launch countdown and familiarization with the payload. Mission STS-105 will be transporting the Expedition Three crew, several payloads and scientific experiments to the International Space Station aboard Space Shuttle Discovery. The Expedition Two crew members currently on the Station will return to Earth on Discovery. The mission is scheduled to launch no earlier than Aug. 9, 2001.

  7. Wetlab-2 - Quantitative PCR Tools for Spaceflight Studies of Gene Expression Aboard the International Space Station

    NASA Technical Reports Server (NTRS)

    Schonfeld, Julie E.

    2015-01-01

    Wetlab-2 is a research platform for conducting real-time quantitative gene expression analysis aboard the International Space Station. The system enables spaceflight genomic studies involving a wide variety of biospecimen types in the unique microgravity environment of space. Currently, gene expression analyses of space flown biospecimens must be conducted post flight after living cultures or frozen or chemically fixed samples are returned to Earth from the space station. Post-flight analysis is limited for several reasons. First, changes in gene expression can be transient, changing over a timescale of minutes. The delay between sampling on Earth can range from days to months, and RNA may degrade during this period of time, even in fixed or frozen samples. Second, living organisms that return to Earth may quickly re-adapt to terrestrial conditions. Third, forces exerted on samples during reentry and return to Earth may affect results. Lastly, follow up experiments designed in response to post-flight results must wait for a new flight opportunity to be tested.

  8. 47 CFR 25.221 - Blanket Licensing provisions for Earth Stations on Vessels (ESVs) receiving in the 3700-4200 MHz...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... on Vessels (ESVs) receiving in the 3700-4200 MHz (space-to-Earth) band and transmitting in the 5925-6425 MHz (Earth-to-space) band, operating with GSO Satellites in the Fixed-Satellite Service. 25.221... SATELLITE COMMUNICATIONS Technical Standards § 25.221 Blanket Licensing provisions for Earth Stations on...

  9. 7 CFR 1735.12 - Nonduplication.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... GENERAL POLICIES, TYPES OF LOANS, LOAN REQUIREMENTS-TELECOMMUNICATIONS PROGRAM Loan Purposes and Basic... of existing wireline local exchange service or similar fixed-station voice service. RUS may finance...

  10. Isolated thermocouple amplifier system for stirred fixed-bed gasifier

    DOEpatents

    Fasching, George E.

    1992-01-01

    A sensing system is provided for determining the bed temperature profile of the bed of a stirred, fixed-bed gasifier including a plurality of temperature sensors for sensing the bed temperature at different levels, a transmitter for transmitting data based on the outputs of the sensors to a remote operator's station, and a battery-based power supply. The system includes an isolation amplifier system comprising a plurality of isolation amplifier circuits for amplifying the outputs of the individual sensors. The isolation amplifier circuits each comprise an isolation operational amplifier connected to a sensor; a first "flying capacitor" circuit for, in operation, controlling the application of power from the power supply to the isolation amplifier; an output sample and hold circuit connected to the transmitter; a second "flying capacitor" circuit for, in operation, controlling the transfer of the output of the isolation amplifier to the sample and hold circuit; and a timing and control circuit for activating the first and second capacitor circuits in a predetermined timed sequence.

  11. The effects of geography on domestic fixed and broadcasting satellite systems in ITU Region 2

    NASA Technical Reports Server (NTRS)

    Sawitz, P. H.

    1980-01-01

    The paper discusses the effects of geography on service arcs and on the various techniques used to achieve frequency reuse and applies the results to the domestic fixed and broadcasting satellite systems of International Telecommunication Union (ITU) Region 2. The effects of an arc latitude, size, and shape are considered. Earth-station and satellite antenna discrimination is outlined.

  12. Hybrid Residual Flexibility/Mass-Additive Method for Structural Dynamic Testing

    NASA Technical Reports Server (NTRS)

    Tinker, M. L.

    2003-01-01

    A large fixture was designed and constructed for modal vibration testing of International Space Station elements. This fixed-base test fixture, which weighs thousands of pounds and is anchored to a massive concrete floor, initially utilized spherical bearings and pendulum mechanisms to simulate Shuttle orbiter boundary constraints for launch of the hardware. Many difficulties were encountered during a checkout test of the common module prototype structure, mainly due to undesirable friction and excessive clearances in the test-article-to-fixture interface bearings. Measured mode shapes and frequencies were not representative of orbiter-constrained modes due to the friction and clearance effects in the bearings. As a result, a major redesign effort for the interface mechanisms was undertaken. The total cost of the fixture design, construction and checkout, and redesign was over $2 million. Because of the problems experienced with fixed-base testing, alternative free-suspension methods were studied, including the residual flexibility and mass-additive approaches. Free-suspension structural dynamics test methods utilize soft elastic bungee cords and overhead frame suspension systems that are less complex and much less expensive than fixed-base systems. The cost of free-suspension fixturing is on the order of tens of thousands of dollars as opposed to millions, for large fixed-base fixturing. In addition, free-suspension test configurations are portable, allowing modal tests to be done at sites without modal test facilities. For example, a mass-additive modal test of the ASTRO-1 Shuttle payload was done at the Kennedy Space Center launch site. In this Technical Memorandum, the mass-additive and residual flexibility test methods are described in detail. A discussion of a hybrid approach that combines the best characteristics of each method follows and is the focus of the study.

  13. Fixed Base Modal Testing Using the NASA GRC Mechanical Vibration Facility

    NASA Technical Reports Server (NTRS)

    Staab, Lucas D.; Winkel, James P.; Suarez, Vicente J.; Jones, Trevor M.; Napolitano, Kevin L.

    2016-01-01

    The Space Power Facility at NASA's Plum Brook Station houses the world's largest and most powerful space environment simulation facilities, including the Mechanical Vibration Facility (MVF), which offers the world's highest-capacity multi-axis spacecraft shaker system. The MVF was designed to perform sine vibration testing of a Crew Exploration Vehicle (CEV)-class spacecraft with a total mass of 75,000 pounds, center of gravity (cg) height above the table of 284 inches, diameter of 18 feet, and capability of 1.25 gravity units peak acceleration in the vertical and 1.0 gravity units peak acceleration in the lateral directions. The MVF is a six-degree-of-freedom, servo-hydraulic, sinusoidal base-shake vibration system that has the advantage of being able to perform single-axis sine vibration testing of large structures in the vertical and two lateral axes without the need to reconfigure the test article for each axis. This paper discusses efforts to extend the MVF's capabilities so that it can also be used to determine fixed base modes of its test article without the need for an expensive test-correlated facility simulation.

  14. Design of monitoring system for mail-sorting based on the Profibus S7 series PLC

    NASA Astrophysics Data System (ADS)

    Zhang, W.; Jia, S. H.; Wang, Y. H.; Liu, H.; Tang, G. C.

    2017-01-01

    With the rapid development of the postal express, the workload of mail sorting is increasing, but the automatic technology of mail sorting is not mature enough. In view of this, the system uses Siemens S7-300 PLC as the main station controller, PLC of Siemens S7-200/400 is from the station controller, through the man-machine interface configuration software MCGS, PROFIBUS-DP communication, RFID technology and mechanical sorting hand achieve mail classification sorting monitoring. Among them, distinguish mail-sorting by scanning RFID posted in the mail electronic bar code (fixed code), the system uses the corresponding controller on the acquisition of information processing, the processed information transmit to the sorting manipulator by PROFIBUS-DP. The system can realize accurate and efficient mail sorting, which will promote the development of mail sorting technology.

  15. STS-105 crew poses for photo on Fixed Service Structure

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The STS-105 crew poses on the Fixed Service Structure at Launch Pad 39A. From left are Mission Specialist Patrick Forrester, Commander Scott Horowitz, Pilot Rick Sturckow and Mission Specialist Dan Barry. The STS-105 and Expedition Three crews are at Kennedy Space Center participating in a Terminal Countdown Demonstration Test, a dress rehearsal for launch. The activities include emergency egress training, a simulated launch countdown and familiarization with the payload. Mission STS-105 will be transporting the Expedition Three crew, several payloads and scientific experiments to the International Space Station aboard Space Shuttle Discovery. The Expedition Two crew members currently on the Station will return to Earth on Discovery. The mission is scheduled to launch no earlier than Aug. 9, 2001.

  16. STS-105 and Expedition Three crews pose together for photo on Fixed Service Structure

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The STS-105 crew poses on the Fixed Service Structure at Launch Pad 39A. From left are Mission Specialist Patrick Forrester, Commander Scott Horowitz, Pilot Rick Sturckow and Mission Specialist Dan Barry. The STS-105 and Expedition Three crews are at Kennedy Space Center participating in a Terminal Countdown Demonstration Test, a dress rehearsal for launch. The activities include emergency egress training, a simulated launch countdown and familiarization with the payload. Mission STS-105 will be transporting the Expedition Three crew, several payloads and scientific experiments to the International Space Station aboard Space Shuttle Discovery. The Expedition Two crew members currently on the Station will return to Earth on Discovery. The mission is scheduled to launch no earlier than Aug. 9, 2001.

  17. Data Gathering and Energy Transfer Dilemma in UAV-Assisted Flying Access Network for IoT

    PubMed Central

    Arabi, Sara; Sadik, Mohamed

    2018-01-01

    Recently, Unmanned Aerial Vehicles (UAVs) have emerged as an alternative solution to assist wireless networks, thanks to numerous advantages they offer in comparison to terrestrial fixed base stations. For instance, a UAV can be used to embed a flying base station providing an on-demand nomadic access to network services. A UAV can also be used to wirelessly recharge out-of-battery ground devices. In this paper, we aim to deal with both data collection and recharging depleted ground Internet-of-Things (IoT) devices through a UAV station used as a flying base station. To extend the network lifetime, we present a novel use of UAV with energy harvesting module and wireless recharging capabilities. However, the UAV is used as an energy source to empower depleted IoT devices. On one hand, the UAV charges depleted ground IoT devices under three policies: (1) low-battery first scheme; (2) high-battery first scheme; and (3) random scheme. On the other hand, the UAV station collects data from IoT devices that have sufficient energy to transmit their packets, and in the same phase, the UAV exploits the Radio Frequency (RF) signals transmitted by IoT devices to extract and harvest energy. Furthermore, and as the UAV station has a limited coverage time due to its energy constraints, we propose and investigate an efficient trade-off between ground users recharging time and data gathering time. Furthermore, we suggest to control and optimize the UAV trajectory in order to complete its travel within a minimum time, while minimizing the energy spent and/or enhancing the network lifetime. Extensive numerical results and simulations show how the system behaves under different scenarios and using various metrics in which we examine the added value of UAV with energy harvesting module. PMID:29751662

  18. Station Keeping of Small Outboard-Powered Boats

    NASA Technical Reports Server (NTRS)

    Fisher, A. D.; VanZwieten, J. H., Jr.; VanZwieten, T. S.

    2010-01-01

    Three station keeping controllers have been developed which work to minimize displacement of a small outboard-powered vessel from a desired location. Each of these three controllers has a common initial layer that uses fixed-gain feedback control to calculate the desired heading of the vessel. A second control layer uses a common fixed-gain feedback controller to calculate the net forward thrust, one of two algorithms for controlling engine angle (Fixed-Gain Proportional-integral-derivative (PID) or PID with Adaptively Augmented Gains), and one of two algorithms for differential throttle control (Fixed-Gain PID and PID with Adaptive Differential Throttle gains), which work together to eliminate heading error. The three selected controllers are evaluated using a numerical simulation of a 33-foot center console vessel with twin outboards that is subject to wave, wind, and current disturbances. Each controller is tested for its ability to maintain position in the presence of three sets of environmental disturbances. These algorithms were tested with current velocity of 1.5 m/s, significant wave height of 0.5 m, and wind speeds of 2, 5, and 10 m/s. These values were chosen to model conditions a small vessel may experience in the Gulf Stream off of Fort Lauderdale. The Fixed-gain PID controller progressively got worse as wind speeds increased, while the controllers using adaptive methodologies showed consistent performance over all weather conditions and decreased heading error by as much as 20%. Thus, enhanced robustness to environmental changes has been gained by using an adaptive algorithm.

  19. STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). Front row of consoles with Propulsion Engineer (PROP) and Guidance, Navigation, and Control Systems Engineer (GNC) are visible in the foreground. CBS television camera personnel record front visual displays (orbital chart and data) for '48 Hours' program to be broadcast at a later date. The integrated simulation involved communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5.

  20. STS-26 long duration simulation in JSC Mission Control Center (MCC) Bldg 30

    NASA Technical Reports Server (NTRS)

    1988-01-01

    STS-26 long duration simulation is conducted in JSC Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). CBS television camera personnel record MCC activities at Spacecraft Communicator (CAPCOM) and Flight Activities Officer (FAO) (foreground) consoles for '48 Hours' program to be broadcast at a later date. The integrated simulation involved communicating with crewmembers stationed in the fixed based (FB) shuttle mission simulator (SMS) located in JSC Mission Simulation and Training Facility Bldg 5. MCC FCR visual displays are seen in front of the rows of consoles.

  1. Estimating the accuracy of the technique of reconstructing the rotational motion of a satellite based on the measurements of its angular velocity and the magnetic field of the Earth

    NASA Astrophysics Data System (ADS)

    Belyaev, M. Yu.; Volkov, O. N.; Monakhov, M. I.; Sazonov, V. V.

    2017-09-01

    The paper has studied the accuracy of the technique that allows the rotational motion of the Earth artificial satellites (AES) to be reconstructed based on the data of onboard measurements of angular velocity vectors and the strength of the Earth magnetic field (EMF). The technique is based on kinematic equations of the rotational motion of a rigid body. Both types of measurement data collected over some time interval have been processed jointly. The angular velocity measurements have been approximated using convenient formulas, which are substituted into the kinematic differential equations for the quaternion that specifies the transition from the body-fixed coordinate system of a satellite to the inertial coordinate system. Thus obtained equations represent a kinematic model of the rotational motion of a satellite. The solution of these equations, which approximate real motion, has been found by the least-square method from the condition of best fitting between the data of measurements of the EMF strength vector and its calculated values. The accuracy of the technique has been estimated by processing the data obtained from the board of the service module of the International Space Station ( ISS). The reconstruction of station motion using the aforementioned technique has been compared with the telemetry data on the actual motion of the station. The technique has allowed us to reconstruct the station motion in the orbital orientation mode with a maximum error less than 0.6° and the turns with a maximal error of less than 1.2°.

  2. 7 CFR 1735.10 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... cost-of-money loans, or RTB loans for any wireline local exchange service or similar fixed-station... plan is not technically or economically feasible. (c) A borrower receiving a loan to provide mobile...

  3. 7 CFR 1735.10 - General.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... cost-of-money loans, or RTB loans for any wireline local exchange service or similar fixed-station... plan is not technically or economically feasible. (c) A borrower receiving a loan to provide mobile...

  4. 49 CFR 398.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... passenger automobile or station wagon, any vehicle, locomotive, or car operated exclusively on a rail or rails, or a trolley bus operated by electric power derived from a fixed overhead wire, furnishing local...

  5. 49 CFR 398.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... passenger automobile or station wagon, any vehicle, locomotive, or car operated exclusively on a rail or rails, or a trolley bus operated by electric power derived from a fixed overhead wire, furnishing local...

  6. 49 CFR 398.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... passenger automobile or station wagon, any vehicle, locomotive, or car operated exclusively on a rail or rails, or a trolley bus operated by electric power derived from a fixed overhead wire, furnishing local...

  7. 49 CFR 398.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... passenger automobile or station wagon, any vehicle, locomotive, or car operated exclusively on a rail or rails, or a trolley bus operated by electric power derived from a fixed overhead wire, furnishing local...

  8. Evaluation of the Impact of Wind Generation on the Electricity Market Prices and on the Profitability of New Wind Investments

    NASA Astrophysics Data System (ADS)

    Pereira, A. J.; Saraiva, J. T.

    2012-10-01

    This paper describes a Dynamic Model of the electricity sector that can be used to simulate the evolution of some key variables on the long term, namely the evolution of the electricity price, of the demand and of the capacity factors of the technologies in the generation mix. This model can be used in different ways and by several agents, for instance to estimate the impact on the electricity price of the increasing presence of renewable power stations, namely using wind power and PV systems. In several countries these stations are paid feed-in tariffs with a fixed price but in some cases this scheme is under discussion and there are opinions that payments determined by the market price are more adequate and would bring fewer costs to final consumers. Such a change has to be carefully evaluated given that the presence of renewable stations bidding at an infra marginal price will affect the price itself. The model described in this paper can be used in a profitable way both by governmental agencies when preparing or studying alternative remuneration schemes to renewable stations or by promoters themselves to get more insight to the profitability of their investments, namely if the fixed feed-in tariffs in force in several countries are changed.

  9. Implantable acoustic-beacon automatic fish-tracking system

    NASA Technical Reports Server (NTRS)

    Mayhue, R. J.; Lovelady, R. W.; Ferguson, R. L.; Richards, C. E.

    1977-01-01

    A portable automatic fish tracking system was developed for monitoring the two dimensional movements of small fish within fixed areas of estuarine waters and lakes. By using the miniature pinger previously developed for this application, prototype tests of the system were conducted in the York River near the Virginia Institute of Marine Science with two underwater listening stations. Results from these tests showed that the tracking system could position the miniature pinger signals to within + or - 2.5 deg and + or - 135 m at ranges up to 2.5 km. The pingers were implanted in small fish and were successfully tracked at comparable ranges. No changes in either fish behavior or pinger performance were observed as a result of the implantation. Based on results from these prototype tests, it is concluded that the now commercially available system provides an effective approach to underwater tracking of small fish within a fixed area of interest.

  10. 47 CFR 90.261 - Assignment and use of the frequencies in the band 450-470 MHz for fixed operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... at least 160° in azimuth. Stations authorized for secondary fixed operations prior to July 13, 1992....19375/458.19375 454.000/459.000 454.00625/459.00625 454.0125/459.0125 454.01875/459.01875 462.950/467.950 462.95625/467.95625 462.9625/467.9625 462.96875/467.96875 462.975/467.975 462.98125/467.98125 462...

  11. Robust Real-Time Wide-Area Differential GPS Navigation

    NASA Technical Reports Server (NTRS)

    Yunck, Thomas P. (Inventor); Bertiger, William I. (Inventor); Lichten, Stephen M. (Inventor); Mannucci, Anthony J. (Inventor); Muellerschoen, Ronald J. (Inventor); Wu, Sien-Chong (Inventor)

    1998-01-01

    The present invention provides a method and a device for providing superior differential GPS positioning data. The system includes a group of GPS receiving ground stations covering a wide area of the Earth's surface. Unlike other differential GPS systems wherein the known position of each ground station is used to geometrically compute an ephemeris for each GPS satellite. the present system utilizes real-time computation of satellite orbits based on GPS data received from fixed ground stations through a Kalman-type filter/smoother whose output adjusts a real-time orbital model. ne orbital model produces and outputs orbital corrections allowing satellite ephemerides to be known with considerable greater accuracy than from die GPS system broadcasts. The modeled orbits are propagated ahead in time and differenced with actual pseudorange data to compute clock offsets at rapid intervals to compensate for SA clock dither. The orbital and dock calculations are based on dual frequency GPS data which allow computation of estimated signal delay at each ionospheric point. These delay data are used in real-time to construct and update an ionospheric shell map of total electron content which is output as part of the orbital correction data. thereby allowing single frequency users to estimate ionospheric delay with an accuracy approaching that of dual frequency users.

  12. A cell-based study on pedestrian acceleration and overtaking in a transfer station corridor

    NASA Astrophysics Data System (ADS)

    Ji, Xiangfeng; Zhou, Xuemei; Ran, Bin

    2013-04-01

    Pedestrian speed in a transfer station corridor is faster than usual and sometimes running can be found among some of them. In this paper, pedestrians are divided into two categories. The first one is aggressive, and the other is conservative. Aggressive pedestrians weaving their way through crowd in the corridor are the study object of this paper. During recent decades, much attention has been paid to the pedestrians' behavior, such as overtaking (also deceleration) and collision avoidance, and that continues in this paper. After sufficiently analyzing the characteristics of pedestrian flow in transfer station corridor, a cell-based model is presented in this paper, including the acceleration (also deceleration) and overtaking analysis. Acceleration (also deceleration) in a corridor is fixed according to Newton's Law and then speed calculated with a kinematic formula is discretized into cells based on the fuzzy logic. After the speed is updated, overtaking is analyzed based on updated speed and force explicitly, compared to rule-based models, which herein we call implicit ones. During the analysis of overtaking, a threshold value to determine the overtaking direction is introduced. Actually, model in this paper is a two-step one. The first step is to update speed, which is the cells the pedestrian can move in one time interval and the other is to analyze the overtaking. Finally, a comparison between the rule-based cellular automata, the model in this paper and data in HCM 2000 is made to demonstrate our model can be used to achieve reasonable simulation of acceleration (also deceleration) and overtaking among pedestrians.

  13. International Space Station (ISS) Environmental Control and Life Support (ECLS) System Overview of Events: February 2002 - 2004

    NASA Technical Reports Server (NTRS)

    Gentry, Gregory J.; Reysa, Richard P.; Williams, Dave E.

    2004-01-01

    The International Space Station continues to build up its life support equipment capability. Several ECLS equipment failures have occurred since Lab activation in February 2001. Major problems occurring between February 2001 and February 2002 were discussed in other works. Major problems occurring between February 2002 and February 2003 are discussed in this paper, as are updates from previously ongoing unresolved problems. This paper addresses failures, and root cause, with particular emphasis on likely micro-gravity causes. Impact to overall station operations and proposed and accomplished fixes will also be discussed.

  14. 47 CFR 1.992 - How to calculate indirect equity and voting interests.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Foreign Ownership of Common Carrier, Aeronautical En Route, and Aeronautical Fixed Radio Station Licensees § 1.992 How...

  15. 47 CFR 1.992 - How to calculate indirect equity and voting interests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROCEDURE Grants by Random Selection Wireless Radio Services Applications and Proceedings Foreign Ownership of Common Carrier, Aeronautical En Route, and Aeronautical Fixed Radio Station Licensees § 1.992 How...

  16. Application of a weighted-averaging method for determining paleosalinity: a tool for restoration of south Florida's estuaries

    USGS Publications Warehouse

    Wingard, G.L.; Hudley, J.W.

    2012-01-01

    A molluscan analogue dataset is presented in conjunction with a weighted-averaging technique as a tool for estimating past salinity patterns in south Florida’s estuaries and developing targets for restoration based on these reconstructions. The method, here referred to as cumulative weighted percent (CWP), was tested using modern surficial samples collected in Florida Bay from sites located near fixed water monitoring stations that record salinity. The results were calibrated using species weighting factors derived from examining species occurrence patterns. A comparison of the resulting calibrated species-weighted CWP (SW-CWP) to the observed salinity at the water monitoring stations averaged over a 3-year time period indicates, on average, the SW-CWP comes within less than two salinity units of estimating the observed salinity. The SW-CWP reconstructions were conducted on a core from near the mouth of Taylor Slough to illustrate the application of the method.

  17. Feasibility Study of Solar Dome Encapsulation of Photovoltaic Arrays

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The technical and economic advantages of using air-supported plastic enclosures to protect flat plate photovoltaic arrays are described. Conceptual designs for a fixed, latitude-tilt array and a fully tracking array were defined. Detailed wind loads and strength analyses were performed for the fixed array. Detailed thermal and power output analyses provided array performance for typical seasonal and extreme temperature conditions. Costs of each design as used in a 200 MWe central power station were defined from manufacturing and material cost estimates. The capital cost and cost of energy for the enclosed fixed-tilt array were lower than for the enclosed tracking array. The enclosed fixed-tilt array capital investment was 38% less, and the levelized bus bar energy cost was 26% less than costs for a conventional, glass-encapsulated array design. The predicted energy cost for the enclosed fixed array was 79 mills/kW-h for direct current delivered to the power conditioning units.

  18. Differences between true mean daily, monthly and annual air temperatures and air temperatures calculated with three equations: a case study from three Croatian stations

    NASA Astrophysics Data System (ADS)

    Bonacci, Ognjen; Željković, Ivana; Trogrlić, Robert Šakić; Milković, Janja

    2013-10-01

    Differences between true mean daily, monthly and annual air temperatures T0 [Eq. (1)] and temperatures calculated with three different equations [(2), (3) and (4)] (commonly used in climatological practice) were investigated at three main meteorological Croatian stations from 1 January 1999 to 31 December 2011. The stations are situated in the following three climatically distinct areas: (1) Zagreb-Grič (mild continental climate), (2) Zavižan (cold mountain climate), and (3) Dubrovnik (hot Mediterranean climate). T1 [Eq. (2)] and T3 [Eq. (4)] mean temperatures are defined by the algorithms based on the weighted means of temperatures measured at irregularly spaced, yet fixed hours. T2 [Eq. (3)] is the mean temperature defined as the average of daily maximum and minimum temperature. The equation as well as the time of observations used introduces a bias into mean temperatures. The largest differences occur for mean daily temperatures. The calculated daily difference value from all three equations and all analysed stations varies from -3.73 °C to +3.56 °C, from -1.39 °C to +0.79 °C for monthly differences and from -0.76 °C to +0.30 °C for annual differences.

  19. Troposphere gradients from the ECMWF in VLBI analysis

    NASA Astrophysics Data System (ADS)

    Boehm, Johannes; Schuh, Harald

    2007-06-01

    Modeling path delays in the neutral atmosphere for the analysis of Very Long Baseline Interferometry (VLBI) observations has been improved significantly in recent years by the use of elevation-dependent mapping functions based on data from numerical weather models. In this paper, we present a fast way of extracting both, hydrostatic and wet, linear horizontal gradients for the troposphere from data of the European Centre for Medium-range Weather Forecasts (ECMWF) model, as it is realized at the Vienna University of Technology on a routine basis for all stations of the International GNSS (Global Navigation Satellite Systems) Service (IGS) and International VLBI Service for Geodesy and Astrometry (IVS) stations. This approach only uses information about the refractivity gradients at the site vertical, but no information from the line-of-sight. VLBI analysis of the CONT02 and CONT05 campaigns, as well as all IVS-R1 and IVS-R4 sessions in the first half of 2006, shows that fixing these a priori gradients improves the repeatability for 74% (40 out of 54) of the VLBI baseline lengths compared to fixing zero or constant a priori gradients, and improves the repeatability for the majority of baselines compared to estimating 24-h offsets for the gradients. Only if 6-h offsets are estimated, the baseline length repeatabilities significantly improve, no matter which a priori gradients are used.

  20. 77 FR 64834 - Exelon Generation Company, LLC; Oyster Creek Nuclear Generating Station; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... automatic fixed deluge water spray system installed over cable trays and open hatches. The deluge... installed over cable trays and open hatches. The deluge suppression system protecting safety- related cable...

  1. 47 CFR 1.993 - Insulation criteria for interests in limited partnerships, limited liability partnerships, and...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Wireless Radio Services Applications and Proceedings Foreign Ownership of Common Carrier, Aeronautical En Route, and Aeronautical Fixed Radio Station Licensees § 1.993 Insulation criteria for interests in...

  2. 47 CFR 1.993 - Insulation criteria for interests in limited partnerships, limited liability partnerships, and...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Wireless Radio Services Applications and Proceedings Foreign Ownership of Common Carrier, Aeronautical En Route, and Aeronautical Fixed Radio Station Licensees § 1.993 Insulation criteria for interests in...

  3. Fixed point theorems of GPS carrier phase ambiguity resolution and their application to massive network processing: Ambizap

    NASA Astrophysics Data System (ADS)

    Blewitt, Geoffrey

    2008-12-01

    Precise point positioning (PPP) has become popular for Global Positioning System (GPS) geodetic network analysis because for n stations, PPP has O(n) processing time, yet solutions closely approximate those of O(n3) full network analysis. Subsequent carrier phase ambiguity resolution (AR) further improves PPP precision and accuracy; however, full-network bootstrapping AR algorithms are O(n4), limiting single network solutions to n < 100. In this contribution, fixed point theorems of AR are derived and then used to develop "Ambizap," an O(n) algorithm designed to give results that closely approximate full network AR. Ambizap has been tested to n ≈ 2800 and proves to be O(n) in this range, adding only ˜50% to PPP processing time. Tests show that a 98-station network is resolved on a 3-GHz CPU in 7 min, versus 22 h using O(n4) AR methods. Ambizap features a novel network adjustment filter, producing solutions that precisely match O(n4) full network analysis. The resulting coordinates agree to ≪1 mm with current AR methods, much smaller than the ˜3-mm RMS precision of PPP alone. A 2000-station global network can be ambiguity resolved in ˜2.5 h. Together with PPP, Ambizap enables rapid, multiple reanalysis of large networks (e.g., ˜1000-station EarthScope Plate Boundary Observatory) and facilitates the addition of extra stations to an existing network solution without need to reprocess all data. To meet future needs, PPP plus Ambizap is designed to handle ˜10,000 stations per day on a 3-GHz dual-CPU desktop PC.

  4. Corn and sorghum phenotyping using a fixed-wing UAV-based remote sensing system

    NASA Astrophysics Data System (ADS)

    Shi, Yeyin; Murray, Seth C.; Rooney, William L.; Valasek, John; Olsenholler, Jeff; Pugh, N. Ace; Henrickson, James; Bowden, Ezekiel; Zhang, Dongyan; Thomasson, J. Alex

    2016-05-01

    Recent development of unmanned aerial systems has created opportunities in automation of field-based high-throughput phenotyping by lowering flight operational cost and complexity and allowing flexible re-visit time and higher image resolution than satellite or manned airborne remote sensing. In this study, flights were conducted over corn and sorghum breeding trials in College Station, Texas, with a fixed-wing unmanned aerial vehicle (UAV) carrying two multispectral cameras and a high-resolution digital camera. The objectives were to establish the workflow and investigate the ability of UAV-based remote sensing for automating data collection of plant traits to develop genetic and physiological models. Most important among these traits were plant height and number of plants which are currently manually collected with high labor costs. Vegetation indices were calculated for each breeding cultivar from mosaicked and radiometrically calibrated multi-band imagery in order to be correlated with ground-measured plant heights, populations and yield across high genetic-diversity breeding cultivars. Growth curves were profiled with the aerial measured time-series height and vegetation index data. The next step of this study will be to investigate the correlations between aerial measurements and ground truth measured manually in field and from lab tests.

  5. Concept for a lunar array for very low frequency radio astronomy

    NASA Technical Reports Server (NTRS)

    Marsh, Kenneth A.; Mahoney, Michael J.; Kuiper, Thomas B. H.; Jones, Dayton L.

    1992-01-01

    We discuss the design considerations relevant to a very low frequency array, to be deployed on the lunar near side during an early expedition. Such an array would operate in the frequency range 1-10 MHz, and would consist nominally of 20 antennas distributed over a region approximately 40 km in extent. Each antenna station would consist of a crossed-dipole antenna, together with a receiver, digitizer, solar cells, and batteries. In addition, the station will contain a UHF transmitter for relaying the digitized signal to a central station where it will be transmitted to Earth for subsequent processing, including cross-correlation with signals from other antennas. Each antenna station (including the central station) would be deployed as a self-contained unit, mounted on a miniature robotic vehicle. No fixed structures are required for the array.

  6. Open hardware, low cost, air quality stations for monitoring ozone in coastal area

    NASA Astrophysics Data System (ADS)

    Lima, Marco; Donzella, Davide; Pintus, Fabio; Fedi, Adriano; Ferrari, Daniele; Massabò, Marco

    2014-05-01

    Ozone concentrations in urban and coastal area are a great concern for citizens and, consequently regulator. In the last 20 years the Ozone concentration is almost doubled and it has attracted the public attention because of the well know harmful impacts on human health and biosphere in general. Official monitoring networks usually comprise high precision, high accuracy observation stations, usually managed by public administrations and environmental agency; unfortunately due to their high costs of installation and maintenance, the monitoring stations are relatively sparse. This kind of monitoring networks have been recognized to be unsuitable to effectively characterize the high variability of air quality, especially in areas where pollution sources are various and often not static. We present a prototype of a low cost station for air quality monitoring, specifically developed for complementing the official monitoring stations improving the representation of air quality spatial distribution. We focused on a semi-professional product that could guarantee the highest reliability at the lowest possible cost, supported by a consistent infrastructure for data management. We test two type of Ozone sensor electrochemical and metal oxide. This work is integrated in the ACRONET Paradigm ® project: an open-hardware platform strongly oriented on environmental monitoring. All software and hardware sources will be available on the web. Thus, a computer and a small amount of work tools will be sufficient to create new monitoring networks, with the only constraint to share all the data obtained. It will so possible to create a real "sensing community". The prototype is currently able to measure ozone level, temperature and relative humidity, but soon, with the upcoming changes, it will be able also to monitor dust, carbon monoxide and nitrogen dioxide, always through the use of commercial sensors. The sensors are grouped in a compact board that interfaces with a data-logger able to transmit data to a dedicated server through a GPRS module (no ad hoc radio infrastructure needed). Due to the GPRS low latency transmission the data are transmitted in near-real time. The prototype has an independent power supply. The sensors outputs are directly compared with the measurement of the official fixed monitoring stations. We present preliminary tests of a ozone level assessment obtained without laboratory calibration during a first field campaign in Savona (Italy); the preliminary verification and test show reasonable agreement between low cost sensors and fixed monitoring station ozone level trends (low cost sensors detect gas concentration at ppb level). The preliminary results are promising for complementing the fixed official monitoring networks with low-cost sensors.

  7. Characteristics of trapped proton anisotropy at Space Station Freedom altitudes

    NASA Technical Reports Server (NTRS)

    Armstrong, T. W.; Colborn, B. L.; Watts, J. W.

    1990-01-01

    The ionizing radiation dose for spacecraft in low-Earth orbit (LEO) is produced mainly by protons trapped in the Earth's magnetic field. Current data bases describing this trapped radiation environment assume the protons to have an isotropic angular distribution, although the fluxes are actually highly anisotropic in LEO. The general nature of this directionality is understood theoretically and has been observed by several satellites. The anisotropy of the trapped proton exposure has not been an important practical consideration for most previous LEO missions because the random spacecraft orientation during passage through the radiation belt 'averages out' the anisotropy. Thus, in spite of the actual exposure anisotropy, cumulative radiation effects over many orbits can be predicted as if the environment were isotropic when the spacecraft orientation is variable during exposure. However, Space Station Freedom will be gravity gradient stabilized to reduce drag, and, due to this fixed orientation, the cumulative incident proton flux will remain anisotropic. The anisotropy could potentially influence several aspects of Space Station design and operation, such as the appropriate location for radiation sensitive components and experiments, location of workstations and sleeping quarters, and the design and placement of radiation monitors. Also, on-board mass could possible be utilized to counteract the anisotropy effects and reduce the dose exposure. Until recently only omnidirectional data bases for the trapped proton environment were available. However, a method to predict orbit-average, angular dependent ('vector') trapped proton flux spectra has been developed from the standard omnidirectional trapped proton data bases. This method was used to characterize the trapped proton anisotropy for the Space Station orbit (28.5 degree inclination, circular) in terms of its dependence on altitude, solar cycle modulation (solar minimum vs. solar maximum), shielding thickness, and radiation effect (silicon rad and rem dose).

  8. Past-behavioural versus situational questions in a postgraduate admissions multiple mini-interview: a reliability and acceptability comparison.

    PubMed

    Yoshimura, Hiroshi; Kitazono, Hidetaka; Fujitani, Shigeki; Machi, Junji; Saiki, Takuya; Suzuki, Yasuyuki; Ponnamperuma, Gominda

    2015-04-14

    The Multiple Mini-Interview (MMI) mostly uses 'Situational' Questions (SQs) as an interview format within a station, rather than 'Past-Behavioural' Questions (PBQs), which are most frequently adopted in traditional single-station personal interviews (SSPIs) for non-medical and medical selection. This study investigated reliability and acceptability of the postgraduate admissions MMI with PBQ and SQ interview formats within MMI stations. Twenty-six Japanese medical graduates, first completed the two-year national obligatory initial postgraduate clinical training programme and then applied to three specialty training programmes - internal medicine, general surgery, and emergency medicine - in a Japanese teaching hospital, where they underwent the Accreditation Council for Graduate Medical Education (ACGME)-competency-based MMI. This MMI contained five stations, with two examiners per station. In each station, a PBQ, and then an SQ were asked consecutively. PBQ and SQ interview formats were not separated into two different stations, or the order of questioning of PBQs and SQs in individual stations was not changed due to lack of space and experienced examiners. Reliability was analysed for the scores of these two MMI question types. Candidates and examiners were surveyed on this experience. The PBQ and SQ formats had generalisability coefficients of 0.822 and 0.821, respectively. With one examiner per station, seven stations could produce a reliability of more than 0.80 in both PBQ and SQ formats. More than 60% of both candidates and examiners felt positive about the overall candidates' ability. All participants liked the fairness of this MMI when compared with the previously experienced SSPI. SQs were perceived more favourable by candidates; in contrast, PBQs were perceived more relevant by examiners. Both PBQs and SQs are equally reliable and acceptable as station interview formats in the postgraduate admissions MMI. However, the use of the two formats within the same station, and with a fixed order, is not the best to maximise its utility as an admission test. Future studies are required to evaluate how best the SQs and PBQs should be combined as station interview formats to enhance reliability, feasibility, acceptability and predictive validity of the MMI.

  9. 47 CFR 101.401 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Eligibility. 101.401 Section 101.401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Developmental Authorizations § 101.401 Eligibility. Developmental authorizations for stations in...

  10. 47 CFR 101.401 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Eligibility. 101.401 Section 101.401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Developmental Authorizations § 101.401 Eligibility. Developmental authorizations for stations in...

  11. 47 CFR 101.401 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Eligibility. 101.401 Section 101.401 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Developmental Authorizations § 101.401 Eligibility. Developmental authorizations for stations in...

  12. Wind-tunnel tests on a 3-dimensional fixed-geometry scramjet inlet at M = 2.30 to 4.60

    NASA Technical Reports Server (NTRS)

    Mueller, J. N.; Trexler, C. A.; Souders, S. W.

    1977-01-01

    Wind-tunnel tests were conducted on a baseline scramjet inlet model having fixed geometry and swept leading edges at M = 2.30, 2.96, 3.95, and 4.60 in the Langley unitary plan wind tunnel. The unit Reynolds number of the tests was held constant at 6.56 million per meter (2 million per foot). The objectives of the tests were to establish inlet performance and starting characteristics in the lower Mach number range of operation (less than M = 5). Surface pressures obtained on the inlet components are presented, along with the results of the internal flow surveys made at the throat and capture stations of the inlet. Contour plots of the inlet-flow-field parameters such as Mach numbers, pressure recovery, flow capture, local static and total pressure ratios at the survey stations are shown for the test Mach numbers.

  13. A self-tuning automatic voltage regulator designed for an industrial environment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flynn, D.; Hogg, B.W.; Swidenbank, E.

    Examination of the performance of fixed parameter controllers has resulted in the development of self-tuning strategies for excitation control of turbogenerator systems. In conjunction with the advanced control algorithms, sophisticated measurement techniques have previously been adopted on micromachine systems to provide generator terminal quantities. In power stations, however, a minimalist hardware arrangement would be selected leading to relatively simple measurement techniques. The performance of a range of self-tuning schemes is investigated on an industrial test-bed, employing a typical industrial hardware measurement system. Individual controllers are implemented on a standard digital automatic voltage regulator, as installed in power stations. This employsmore » a VME platform, and the self-tuning algorithms are introduced by linking to a transputer network. The AVR includes all normal features, such as field forcing, VAR limiting and overflux protection. Self-tuning controller performance is compared with that of a fixed gain digital AVR.« less

  14. The 30/20 GHz demonstration system SSUS-D/BSE

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The systems consisting of a 30/20 GHz communication satellite featuring a multiple fixed beam and scanning beam antenna, SS-TDMA, onboard processing and high power TWT's and IMPATT amplifiers, a trunking space-diversity Earth station, a customer premise system (CPS) portable Earth station and a Master Control Station. Hardware, software and personnel are included to build and launch one satellite and to carry on a two year experimentation and demonstration period of advanced Ka-band systems concepts and technology. Included are first level plans identifying all tasks, a schedule for system development and an assessment of critical technology and risk and a preliminary experiments plan.

  15. Determining Crust and Upper Mantle Structure by Bayesian Joint Inversion of Receiver Functions and Surface Wave Dispersion at a Single Station: Preparation for Data from the InSight Mission

    NASA Astrophysics Data System (ADS)

    Jia, M.; Panning, M. P.; Lekic, V.; Gao, C.

    2017-12-01

    The InSight (Interior Exploration using Seismic Investigations, Geodesy and Heat Transport) mission will deploy a geophysical station on Mars in 2018. Using seismology to explore the interior structure of the Mars is one of the main targets, and as part of the mission, we will use 3-component seismic data to constrain the crust and upper mantle structure including P and S wave velocities and densities underneath the station. We will apply a reversible jump Markov chain Monte Carlo algorithm in the transdimensional hierarchical Bayesian inversion framework, in which the number of parameters in the model space and the noise level of the observed data are also treated as unknowns in the inversion process. Bayesian based methods produce an ensemble of models which can be analyzed to quantify uncertainties and trade-offs of the model parameters. In order to get better resolution, we will simultaneously invert three different types of seismic data: receiver functions, surface wave dispersion (SWD), and ZH ratios. Because the InSight mission will only deliver a single seismic station to Mars, and both the source location and the interior structure will be unknown, we will jointly invert the ray parameter in our approach. In preparation for this work, we first verify our approach by using a set of synthetic data. We find that SWD can constrain the absolute value of velocities while receiver functions constrain the discontinuities. By joint inversion, the velocity structure in the crust and upper mantle is well recovered. Then, we apply our approach to real data from an earth-based seismic station BFO located in Black Forest Observatory in Germany, as already used in a demonstration study for single station location methods. From the comparison of the results, our hierarchical treatment shows its advantage over the conventional method in which the noise level of observed data is fixed as a prior.

  16. 47 CFR 25.132 - Verification of earth station antenna performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... frequency band of interest and submitted to the Commission. (1) Co-polarized patterns in the elevation plane... than 3 meters in diameter and antennas on simple (manual) drive mounts that are operated at a fixed...

  17. 78 FR 14920 - Earth Stations Aboard Aircraft Communicating With Fixed-Satellite Service Geostationary-Orbit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... broadband services, including Internet access, to passengers and flight crews aboard commercial airliners... available for download over the Internet at http://hraunfoss.fcc.gov/edocs_public/attachmatch/FCC-12-161A1...

  18. 47 CFR 101.801 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Eligibility. 101.801 Section 101.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.801 Eligibility. Authorizations for stations in this...

  19. 47 CFR 101.1303 - Eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Eligibility. 101.1303 Section 101.1303 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Multiple Address Systems General Provisions § 101.1303 Eligibility. Authorizations for stations in...

  20. 47 CFR 101.801 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Eligibility. 101.801 Section 101.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.801 Eligibility. Authorizations for stations in this...

  1. 47 CFR 101.801 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Eligibility. 101.801 Section 101.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.801 Eligibility. Authorizations for stations in this...

  2. 47 CFR 101.801 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Eligibility. 101.801 Section 101.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.801 Eligibility. Authorizations for stations in this...

  3. 47 CFR 101.1303 - Eligibility.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Eligibility. 101.1303 Section 101.1303 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Multiple Address Systems General Provisions § 101.1303 Eligibility. Authorizations for stations in...

  4. 47 CFR 101.801 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Eligibility. 101.801 Section 101.801 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.801 Eligibility. Authorizations for stations in this...

  5. 47 CFR 101.1303 - Eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Eligibility. 101.1303 Section 101.1303 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Multiple Address Systems General Provisions § 101.1303 Eligibility. Authorizations for stations in...

  6. Emergency egress requirements for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Ray, Paul S.

    1990-01-01

    There is a real concern regarding the requirements for safe emergency egress from the Space Station Freedom (SSF). The possible causes of emergency are depressurization due to breach of the station hull by space debris, meteoroids, seal failure, or vent failure; chemical toxicity; and a large fire. The objectives of the current study are to identify the tasks required to be performed in emergencies, establish the time required to perform these tasks, and to review the human equipment interface in emergencies. It was found that a fixed time value specified for egress has shifted focus from the basic requirements of safe egress, that in some situations the crew members may not be able to complete the emergency egress tasks in three minutes without sacrificing more than half of the station, and that increased focus should be given to human factors aspects of space station design.

  7. Simulation of interference between Earth stations and Earth-orbiting satellites

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1994-01-01

    It is often desirable to determine the potential for radio frequency interference between earth stations and orbiting spacecraft. This information can be used to select frequencies for radio systems to avoid interference or it can be used to determine if coordination between radio systems is necessary. A model is developed that will determine the statistics of interference between earth stations and elliptical orbiting spacecraft. The model uses orbital dynamics, detailed antenna patterns, and spectral characteristics to obtain accurate levels of interference at the victim receiver. The model is programmed into a computer simulation to obtain long-term statistics of interference. Two specific examples are shown to demonstrate the model. The first example is a simulation of interference from a fixed-satellite earth station to an orbiting scatterometer receiver. The second example is a simulation of interference from earth-exploration satellites to a deep-space earth station.

  8. Probable LAGEOS contributions to a worldwide geodynamics control network

    NASA Technical Reports Server (NTRS)

    Bender, P. L.; Goad, C. C.

    1979-01-01

    The paper describes simulations performed on the contributions which LAGEOS laser ranging data can make to the establishment of a worldwide geodynamics control network. A distribution of 10 fixed ranging stations was assumed for most of the calculations, and a single 7-day arc was used, measurements assumed to be made every 10 minutes in order to avoid artificial reductions in the uncertainties due to oversampling. Computer simulations were carried out in which the coordinates of the stations and improvements in the gravity field coefficients were solved for simultaneously. It is suggested that good accuracy for station coordinates can be expected, even with the present gravity field model uncertainties, if sufficient measurement accuracy is achieved at a reasonable distribution of stations. Further, it is found that even 2-cm range measurement errors would be likely to be the main source of station coordinate errors in retrospective analyses of LAGEOS ranging results five or six years from now.

  9. Calibration of Smartphone-Based Weather Measurements Using Pairwise Gossip.

    PubMed

    Zamora, Jane Louie Fresco; Kashihara, Shigeru; Yamaguchi, Suguru

    2015-01-01

    Accurate and reliable daily global weather reports are necessary for weather forecasting and climate analysis. However, the availability of these reports continues to decline due to the lack of economic support and policies in maintaining ground weather measurement systems from where these reports are obtained. Thus, to mitigate data scarcity, it is required to utilize weather information from existing sensors and built-in smartphone sensors. However, as smartphone usage often varies according to human activity, it is difficult to obtain accurate measurement data. In this paper, we present a heuristic-based pairwise gossip algorithm that will calibrate smartphone-based pressure sensors with respect to fixed weather stations as our referential ground truth. Based on actual measurements, we have verified that smartphone-based readings are unstable when observed during movement. Using our calibration algorithm on actual smartphone-based pressure readings, the updated values were significantly closer to the ground truth values.

  10. Calibration of Smartphone-Based Weather Measurements Using Pairwise Gossip

    PubMed Central

    Yamaguchi, Suguru

    2015-01-01

    Accurate and reliable daily global weather reports are necessary for weather forecasting and climate analysis. However, the availability of these reports continues to decline due to the lack of economic support and policies in maintaining ground weather measurement systems from where these reports are obtained. Thus, to mitigate data scarcity, it is required to utilize weather information from existing sensors and built-in smartphone sensors. However, as smartphone usage often varies according to human activity, it is difficult to obtain accurate measurement data. In this paper, we present a heuristic-based pairwise gossip algorithm that will calibrate smartphone-based pressure sensors with respect to fixed weather stations as our referential ground truth. Based on actual measurements, we have verified that smartphone-based readings are unstable when observed during movement. Using our calibration algorithm on actual smartphone-based pressure readings, the updated values were significantly closer to the ground truth values. PMID:26421312

  11. 47 CFR 101.511 - Permissible services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... authorization. (b) Stations may render any kind of digital communications service consistent with the Commission... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.511 Permissible services. (a...

  12. Cryospheric monitoring with new low power RTK dGPS systems

    NASA Astrophysics Data System (ADS)

    Martinez, K.; Hart, J. K.; Bragg, G. M.; Curry, J. S.

    2017-12-01

    Differential GPS is often used to measure the movement of glaciers. It requires data to be recorded at a fixed base station as well as the moving rover unit, followed by post-processing in order to compute the rover's positions. The typical dGPS units used consume considerable power and the recording times are often around one hour per reading. While this provides very precise (typically millimetre) precision it comes at a cost of power used and the data is rather large to send offsite regularly. Real-time kinematic modes of dGPS are typically used for rapid mapping and autonomous vehicles. New devices are lower cost and smaller size. They also provide a fix within a few minutes, which can be transmitted home. We describe the design, deployment and preliminary results of two tracking systems to monitor ice movement. The first used a normal GPS and Iridium satellite messaging to track the movement of a Greenland iceberg which calved from the Nattivit Apusiiat glacier (south west Greenland). This system followed the iceberg as it flowed 660 km south along the coast of Greenland. The second system was installed in Iceland to track the movement of glaciers using 2 different dGPS systems. A low power ARM Cortex M4-based controller ran Python code to schedule dGPS activity periodically and gather fixes. An Iridium short messaging unit (Rockblock) was used to transmit RTK location fixes. The aim was to experiment with the use of RTK dGPS as an alternative to recordings to measure how the glaciers responded to small scale changes in temperature and precipitation throughout the year.

  13. Multi-Tasking: First Shuttle Mission Since Columbia Combines Test Flight, Catch-Up ISS Supply and Maintenance

    NASA Technical Reports Server (NTRS)

    Morring, Frank, Jr.

    2005-01-01

    NASA's space shuttle fleet is nearing its return to flight with a complex mission on board Discovery that will combine tests of new hardware and procedures adopted in the wake of Columbia's loss with urgent repairs and resupply for the International Space Station. A seven-member astronaut crew has trained throughout most of the two-year hiatus in shuttle operations for the 13-day mission, shooting for a three-week launch window that opens May 15. The window, and much else about the STS-114 mission, is constrained by NASA's need to ensure it has fixed the ascent/debris problem that doomed Columbia and its crew as they attempted to reenter the atmosphere on Feb. 1, 2003. The window was selected so Discovery's ascent can be photographed in daylight with 107 different ground- and aircraft-based cameras to monitor the redesigned external tank for debris shedding. Fixed cameras and the shuttle crew will also photograph the tank in space after it has been jettisoned.

  14. A microcomputer-based position updating system for general aviation utilizing Loran-C

    NASA Technical Reports Server (NTRS)

    Fischer, J. P.

    1982-01-01

    Modern digital electronic technology is used to produce a device to convert LORAN C to useful pilot information using a simple software algebra and low cost microprocessor devices. Results indicate that the processor based LORAN C navigator has an accuracy of 1.0 nm or less over an area typically covered by a triad of Loran C stations and can execute a position update in less than 0.2 seconds. The system was tested in 30 hours of flight and proved that it can give reliable and accurate navigation information. Methods of converting time differences to position, design considerations for the microcomputer system, and the system for coordinate conversion are discussed. Testing with predetermined points and possible fixes for errors are also considered.

  15. Cost effectiveness of stream-gaging program in Michigan

    USGS Publications Warehouse

    Holtschlag, D.J.

    1985-01-01

    This report documents the results of a study of the cost effectiveness of the stream-gaging program in Michigan. Data uses and funding sources were identified for the 129 continuous gaging stations being operated in Michigan as of 1984. One gaging station was identified as having insufficient reason to continue its operation. Several stations were identified for reactivation, should funds become available, because of insufficiencies in the data network. Alternative methods of developing streamflow information based on routing and regression analyses were investigated for 10 stations. However, no station records were reproduced with sufficient accuracy to replace conventional gaging practices. A cost-effectiveness analysis of the data-collection procedure for the ice-free season was conducted using a Kalman-filter analysis. To define missing-record characteristics, cross-correlation coefficients and coefficients of variation were computed at stations on the basis of daily mean discharge. Discharge-measurement data were used to describe the gage/discharge rating stability at each station. The results of the cost-effectiveness analysis for a 9-month ice-free season show that the current policy of visiting most stations on a fixed servicing schedule once every 6 weeks results in an average standard error of 12.1 percent for the current $718,100 budget. By adopting a flexible servicing schedule, the average standard error could be reduced to 11.1 percent. Alternatively, the budget could be reduced to $700,200 while maintaining the current level of accuracy. A minimum budget of $680,200 is needed to operate the 129-gaging-station program; a budget less than this would not permit proper service and maintenance of stations. At the minimum budget, the average standard error would be 14.4 percent. A budget of $789,900 (the maximum analyzed) would result in a decrease in the average standard error to 9.07 percent. Owing to continual changes in the composition of the network and the changes in the uncertainties of streamflow accuracy at individual stations, the cost-effectiveness analysis will need to be updated regularly if it is to be used as a management tool. Cost of these updates need to be considered in decisions concerning the feasibility of flexible servicing schedules.

  16. Precise Point Positioning with Partial Ambiguity Fixing.

    PubMed

    Li, Pan; Zhang, Xiaohong

    2015-06-10

    Reliable and rapid ambiguity resolution (AR) is the key to fast precise point positioning (PPP). We propose a modified partial ambiguity resolution (PAR) method, in which an elevation and standard deviation criterion are first used to remove the low-precision ambiguity estimates for AR. Subsequently the success rate and ratio-test are simultaneously used in an iterative process to increase the possibility of finding a subset of decorrelated ambiguities which can be fixed with high confidence. One can apply the proposed PAR method to try to achieve an ambiguity-fixed solution when full ambiguity resolution (FAR) fails. We validate this method using data from 450 stations during DOY 021 to 027, 2012. Results demonstrate the proposed PAR method can significantly shorten the time to first fix (TTFF) and increase the fixing rate. Compared with FAR, the average TTFF for PAR is reduced by 14.9% for static PPP and 15.1% for kinematic PPP. Besides, using the PAR method, the average fixing rate can be increased from 83.5% to 98.2% for static PPP, from 80.1% to 95.2% for kinematic PPP respectively. Kinematic PPP accuracy with PAR can also be significantly improved, compared to that with FAR, due to a higher fixing rate.

  17. Precise Point Positioning with Partial Ambiguity Fixing

    PubMed Central

    Li, Pan; Zhang, Xiaohong

    2015-01-01

    Reliable and rapid ambiguity resolution (AR) is the key to fast precise point positioning (PPP). We propose a modified partial ambiguity resolution (PAR) method, in which an elevation and standard deviation criterion are first used to remove the low-precision ambiguity estimates for AR. Subsequently the success rate and ratio-test are simultaneously used in an iterative process to increase the possibility of finding a subset of decorrelated ambiguities which can be fixed with high confidence. One can apply the proposed PAR method to try to achieve an ambiguity-fixed solution when full ambiguity resolution (FAR) fails. We validate this method using data from 450 stations during DOY 021 to 027, 2012. Results demonstrate the proposed PAR method can significantly shorten the time to first fix (TTFF) and increase the fixing rate. Compared with FAR, the average TTFF for PAR is reduced by 14.9% for static PPP and 15.1% for kinematic PPP. Besides, using the PAR method, the average fixing rate can be increased from 83.5% to 98.2% for static PPP, from 80.1% to 95.2% for kinematic PPP respectively. Kinematic PPP accuracy with PAR can also be significantly improved, compared to that with FAR, due to a higher fixing rate. PMID:26067196

  18. Computation of Estonian CORS data using Bernese 5.2 and Gipsy 6.4 softwares

    NASA Astrophysics Data System (ADS)

    Kollo, Karin; Kall, Tarmo; Liibusk, Aive

    2017-04-01

    GNSS permanent station network in Estonia (ESTREF) was established already in 2007. In 2014-15 extensive reconstruction of ESTREF was carried out, including the establishment of 18 new stations, change of the hardware in CORS stations as well as establishing GNSS-RTK service for the whole Estonia. For GNSS-RTK service one needs precise coordinates in well-defined reference frame, i.e., ETRS89. For long time stability of stations and time-series analysis the re-processing of Estonian CORS data is ongoing. We re-process data from 2007 until 2015 with program Bernese GNSS 5.2 (Dach, 2015). For the set of ESTREF stations established in 2007, we perform as well computations with GIPSY 6.4 software (Ries et al., 2015). In the computations daily GPS-only solution was used. For precise orbits, final products from CODE (CODE analysis centre at the Astronomical Institute of the University of Bern) and JPL (Jet Propulsion Laboratory) for Bernese and GIPSY solutions were used, respectively. The cut-off angle was set to 10 degrees in order to avoid near-field multipath influence. In GIPSY, precise point positioning method with fixing ambiguities was used. Bernese calculations were performed based on double difference processing. Antenna phase centers were modelled based on igs08.atx and epnc_08.atx files. Vienna mapping function was used for mapping tropospheric delays. For the GIPSY solution, the higher order ionospheric term was modelled based on IRI-2012b model. For the Bernese solution higher order ionospheric term was neglected. FES2004 ocean tide loading model was used for the both computation strategies. As a result, two solutions using different scientific GNSS computation programs were obtained. The results from Bernese and GIPSY solutions were compared, using station repeatability values, RMS and coordinate differences. KEYWORDS: GNSS reference station network, Bernese GNSS 5.2, Gipsy 6.4, Estonia. References: Dach, R., S. Lutz, P. Walser, P. Fridez (Eds); 2015: Bernese GNSS Software Version 5.2. User manual, Astronomical Institute, Universtiy of Bern, Bern Open Publishing. DOI: 10.7892/boris.72297; ISBN: 978-3-906813-05-9. Paul Ries, Willy Bertiger, Shailen, Shailen Desai, & Kevin Miller. (2015). GIPSY 6.4 Release Notes. Jet Propulsion Laboratory, California Institute of Technology. Retrieved from https://gipsy-oasis.jpl.nasa.gov/docs/index.php

  19. Optimizing fixed observational assets in a coastal observatory

    NASA Astrophysics Data System (ADS)

    Frolov, Sergey; Baptista, António; Wilkin, Michael

    2008-11-01

    Proliferation of coastal observatories necessitates an objective approach to managing of observational assets. In this article, we used our experience in the coastal observatory for the Columbia River estuary and plume to identify and address common problems in managing of fixed observational assets, such as salinity, temperature, and water level sensors attached to pilings and moorings. Specifically, we addressed the following problems: assessing the quality of an existing array, adding stations to an existing array, removing stations from an existing array, validating an array design, and targeting of an array toward data assimilation or monitoring. Our analysis was based on a combination of methods from oceanographic and statistical literature, mainly on the statistical machinery of the best linear unbiased estimator. The key information required for our analysis was the covariance structure for a field of interest, which was computed from the output of assimilated and non-assimilated models of the Columbia River estuary and plume. The network optimization experiments in the Columbia River estuary and plume proved to be successful, largely withstanding the scrutiny of sensitivity and validation studies, and hence providing valuable insight into optimization and operation of the existing observational network. Our success in the Columbia River estuary and plume suggest that algorithms for optimal placement of sensors are reaching maturity and are likely to play a significant role in the design of emerging ocean observatories, such as the United State's ocean observation initiative (OOI) and integrated ocean observing system (IOOS) observatories, and smaller regional observatories.

  20. Accuracy and coverage of the modernized Polish Maritime differential GPS system

    NASA Astrophysics Data System (ADS)

    Specht, Cezary

    2011-01-01

    The DGPS navigation service augments The NAVSTAR Global Positioning System by providing localized pseudorange correction factors and ancillary information which are broadcast over selected marine reference stations. The DGPS service position and integrity information satisfy requirements in coastal navigation and hydrographic surveys. Polish Maritime DGPS system has been established in 1994 and modernized (in 2009) to meet the requirements set out in IMO resolution for a future GNSS, but also to preserve backward signal compatibility of user equipment. Having finalized installation of the new technology L1, L2 reference equipment performance tests were performed.The paper presents results of the coverage modeling and accuracy measuring campaign based on long-term signal analyses of the DGPS reference station Rozewie, which was performed for 26 days in July 2009. Final results allowed to verify the coverage area of the differential signal from reference station and calculated repeatable and absolute accuracy of the system, after the technical modernization. Obtained field strength level area and position statistics (215,000 fixes) were compared to past measurements performed in 2002 (coverage) and 2005 (accuracy), when previous system infrastructure was in operation.So far, no campaigns were performed on differential Galileo. However, as signals, signal processing and receiver techniques are comparable to those know from DGPS. Because all satellite differential GNSS systems use the same transmission standard (RTCM), maritime DGPS Radiobeacons are standardized in all radio communication aspects (frequency, binary rate, modulation), then the accuracy results of differential Galileo can be expected as a similar to DGPS.Coverage of the reference station was calculated based on unique software, which calculate the signal strength level based on transmitter parameters or field signal strength measurement campaign, done in the representative points. The software works based on Baltic sea vector map, ground electric parameters and models atmospheric noise level in the transmission band.

  1. Forecast Model and Product Assessment Project User’s Guide

    DTIC Science & Technology

    2011-05-01

    Domain Filter FIXED LENGTH SECTION...1 0 - don’t filter 1 - return stations within latitude/longitude corners 2 - return...Latitude/Longitude Corners (lines skipped if not Domain Filter 1) -------------------------- CapeC_1_d1 26.000 SW corner latitude

  2. 47 CFR 1.227 - Consolidations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... application. (ii) Domestic public fixed and public mobile. See Rule § 21.31 of this chapter for the... as to amendments of applications. (iii) Public coast stations (Maritime mobile service). See... issues, or (2) Any applications which present conflicting claims, except where a random selection process...

  3. 47 CFR 27.1135 - Protection of non-Federal Government Meteorological-Satellite operations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Meteorological-Satellite operations. 27.1135 Section 27.1135 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1710-1755 MHz, 2110-2155... Government Meteorological-Satellite operations. AWS licensees operating fixed stations in the 1710-1755 MHz...

  4. 47 CFR 27.1135 - Protection of non-Federal Government Meteorological-Satellite operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Meteorological-Satellite operations. 27.1135 Section 27.1135 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1710-1755 MHz, 2110-2155... Government Meteorological-Satellite operations. AWS licensees operating fixed stations in the 1710-1755 MHz...

  5. 47 CFR 27.1135 - Protection of non-Federal Government Meteorological-Satellite operations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Meteorological-Satellite operations. 27.1135 Section 27.1135 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES 1710-1755 MHz, 2110-2155... Government Meteorological-Satellite operations. AWS licensees operating fixed stations in the 1710-1755 MHz...

  6. 47 CFR 101.807 - Transmitter power.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Transmitter power. 101.807 Section 101.807 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.807 Transmitter power. Stations in this service will...

  7. 47 CFR 101.807 - Transmitter power.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Transmitter power. 101.807 Section 101.807 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.807 Transmitter power. Stations in this service will...

  8. 47 CFR 101.807 - Transmitter power.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Transmitter power. 101.807 Section 101.807 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.807 Transmitter power. Stations in this service will...

  9. 47 CFR 101.807 - Transmitter power.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Transmitter power. 101.807 Section 101.807 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.807 Transmitter power. Stations in this service will...

  10. 47 CFR 101.807 - Transmitter power.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Transmitter power. 101.807 Section 101.807 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Local Television Transmission Service § 101.807 Transmitter power. Stations in this service will...

  11. 47 CFR 90.463 - Transmitter control points.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....463 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES.... (b) Each station or licensed system of communication shall normally have a control point, or control... fixed position in a system of communication at or from which the control operator exercises supervision...

  12. Optimizing Placement of Weather Stations: Exploring Objective Functions of Meaningful Combinations of Multiple Weather Variables

    NASA Astrophysics Data System (ADS)

    Snyder, A.; Dietterich, T.; Selker, J. S.

    2017-12-01

    Many regions of the world lack ground-based weather data due to inadequate or unreliable weather station networks. For example, most countries in Sub-Saharan Africa have unreliable, sparse networks of weather stations. The absence of these data can have consequences on weather forecasting, prediction of severe weather events, agricultural planning, and climate change monitoring. The Trans-African Hydro-Meteorological Observatory (TAHMO.org) project seeks to address these problems by deploying and operating a large network of weather stations throughout Sub-Saharan Africa. To design the TAHMO network, we must determine where to place weather stations within each country. We should consider how we can create accurate spatio-temporal maps of weather data and how to balance the desired accuracy of each weather variable of interest (precipitation, temperature, relative humidity, etc.). We can express this problem as a joint optimization of multiple weather variables, given a fixed number of weather stations. We use reanalysis data as the best representation of the "true" weather patterns that occur in the region of interest. For each possible combination of sites, we interpolate the reanalysis data between selected locations and calculate the mean average error between the reanalysis ("true") data and the interpolated data. In order to formulate our multi-variate optimization problem, we explore different methods of weighting each weather variable in our objective function. These methods include systematic variation of weights to determine which weather variables have the strongest influence on the network design, as well as combinations targeted for specific purposes. For example, we can use computed evapotranspiration as a metric that combines many weather variables in a way that is meaningful for agricultural and hydrological applications. We compare the errors of the weather station networks produced by each optimization problem formulation. We also compare these errors to those of manually designed weather station networks in West Africa, planned by the respective host-country's meteorological agency.

  13. Land mobile satellite system requirements

    NASA Astrophysics Data System (ADS)

    Kiesling, J. D.

    1983-05-01

    A Land Mobile Satellite System (LMSS) provides voice, data and related communications services to moving vehicles and persons. Communications between the mobiles and satellite are in the 806-890 MHz band. The satellite translates these signals to a ""fixed services band'' such as 14/12 GHz band (Ku-band), and communicates in this band with fixed terminals called gateways. The gateways are located at convenient places such as telephone switches (which provide entry into the national telephone system), dispatcher headquarters, computer centers, etc. Communications are therefore principally mobile to fixed. A third communications link, also at Ku-band, is needed between the satellite and a single fixed ground station. This link provides satellite command, telemetry and ranging and also provides a network control function. The latter, through a common signalling system, receives requests and assigns channel slots, and otherwise controls, monitors and polices the network and collects billing information.

  14. Land mobile satellite system requirements

    NASA Technical Reports Server (NTRS)

    Kiesling, J. D.

    1983-01-01

    A Land Mobile Satellite System (LMSS) provides voice, data and related communications services to moving vehicles and persons. Communications between the mobiles and satellite are in the 806-890 MHz band. The satellite translates these signals to a ""fixed services band'' such as 14/12 GHz band (Ku-band), and communicates in this band with fixed terminals called gateways. The gateways are located at convenient places such as telephone switches (which provide entry into the national telephone system), dispatcher headquarters, computer centers, etc. Communications are therefore principally mobile to fixed. A third communications link, also at Ku-band, is needed between the satellite and a single fixed ground station. This link provides satellite command, telemetry and ranging and also provides a network control function. The latter, through a common signalling system, receives requests and assigns channel slots, and otherwise controls, monitors and polices the network and collects billing information.

  15. Critical capacity, travel time delays and travel time distribution of rapid mass transit systems

    NASA Astrophysics Data System (ADS)

    Legara, Erika Fille; Monterola, Christopher; Lee, Kee Khoon; Hung, Gih Guang

    2014-07-01

    We set up a mechanistic agent-based model of a rapid mass transit system. Using empirical data from Singapore's unidentifiable smart fare card, we validate our model by reconstructing actual travel demand and duration of travel statistics. We subsequently use this model to investigate two phenomena that are known to significantly affect the dynamics within the RTS: (1) overloading in trains and (2) overcrowding in the RTS platform. We demonstrate that by varying the loading capacity of trains, a tipping point emerges at which an exponential increase in the duration of travel time delays is observed. We also probe the impact on the rail system dynamics of three types of passenger growth distribution across stations: (i) Dirac delta, (ii) uniform and (iii) geometric, which is reminiscent of the effect of land use on transport. Under the assumption of a fixed loading capacity, we demonstrate the dependence of a given origin-destination (OD) pair on the flow volume of commuters in station platforms.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    De Blas, Alfredo; Tapia, Carlos; Riego, Albert

    Presentation the Equipment for the Continuous Measurement and Identification of Gamma Radioactivity on Aerosols developed by the Nuclear Engineering Research Group (NERG) from the Technical University of Catalonia (UPC) and the Raditel Company. The device is based on a fixed filter of glass fiber (100% borosilicate), this allows determine the concentration of activity of gamma emitters on aerosols in air. A specifically developed Spectrometry Analysis System has been developed. The analysis of the spectra allows the identification of the emitters and determine the concentration of activity. Nowadays four Stations with this equipment are operating on the Environmental Radiological Surveillance Networkmore » of the Catalonian Generalitat (Spain): two near the Asco and Vandellos Nuclear Power Plants in the province of Tarragona and one in the city of Barcelona. Soon a fourth monitor will be incorporated at Roses (province of Girona) and a fifth in Puigcerda (province of Barcelona). We present measurements and analysis of the evolution of the emitters identified on different stations of the Network. (authors)« less

  17. The environmental status of coal ash produced in Israel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzger, L.A.

    1996-12-31

    From the 6.1 million tons of coal ash produced by Israeli power stations during the 1982--95 period, 65% were utilized for cement production, 18% served to construct embankments around the Hadera coastal power station, and the remaining 17% were disposed to the sea, according to permits issued by the governmental authorities. The coal imported to Israel is typically low-sulfur, beneficiated bituminous coal, and ash produced from it is alkaline and characterized by low concentrations of trace elements. According to the results of leaching tests, the potential release of trace elements from the ash is low, thus there is only amore » minor risk of contaminating groundwater under disposal or utilization sites. However, while the annual ash production increases and is planned to reach one million tons in the year 2000, the promotion of ash employment for new applications, for example as a road base material or for shore extension projects, is still prevented by the absence of regulations fixing the environmental status of coal ash.« less

  18. KSC-02pd0590

    NASA Image and Video Library

    2002-04-29

    KENNEDY SPACE CENTER, FLA. -- Space Shuttle Endeavour rests on Launch Pad 39A after rollout from the Vehicle Assembly Building. The Shuttle comprises the orbiter, in front, and the taller orange external tank behind it flanked by twin solid rocket boosters. The Shuttle sits on the Mobile Launcher Platform that straddles the flame trench below. On either side of Endeavour's tail and main engines are the tail service masts that support the fluid,, gas and electrical requirements of the orbiter's liquid oxyen and liquid hydrogen aft T-0 umbilicals. At left is the open Rotating Service Structure and the Fixed Service Structure to its right, with its 80-foot lightning mast on top. Mission STS-111 is designated UF-2, the 14th assembly flight to the International Space Station. Endeavour's payload includes the Multi-Purpose Logistics Module Leonardo and Mobile Base System. The mission also will swap resident crews on the Station, carrying the Expedition 5 crew and returning to Earth Expedition 4. Liftoff of Endeavour is scheduled between 4 and 8 p.m. May 30, 2002

  19. KSC-02pd0721

    NASA Image and Video Library

    2002-05-17

    KENNEDY SPACE CENTER, FLA. -- STS-111 Mission Specialist Philippe Perrin, with the French Space Agency, adjusts his glove after climbing out of the slidewire basket on the 195-foot level of the Fixed Service Structure on Launch Pad 39A. He and the rest of the mission crew and Expedition 5 crew are taking part in Terminal Countdown Demonstration Test activities, which include emergency egress training and a simulated launch countdown. Mission STS-111 is Utilization Flight 2, carrying equipment and supplies in the Multi-Purpose Logistics Module Leonardo to the International Space Station, plus the Mobile Base System (MBA) and an Orbital Replacement Unit. The MBS will be installed on the Mobile Transporter to complete the Canadian Mobile Servicing System, or MSS, enabling Canadarm 2 to "inchworm" from the U.S. Lab Destiny to the MSS and travel along the truss to work sites. The Expedition 5 crew is traveling on Endeavour to replace the Expedition 4 crew on the Station. Launch of Endeavour is scheduled for May 30, 2002

  20. STS-44 Atlantis, OV-104, crewmembers participate in FB-SMS training at JSC

    NASA Technical Reports Server (NTRS)

    1991-01-01

    STS-44 Atlantis, Orbiter Vehicle (OV) 104, Commander Frederick D. Gregory (left) and Pilot Terence T. Henricks (right), positioned at their appointed stations on the forward flight deck, are joined by Mission Specialist (MS) F. Story Musgrave (center). The crewmembers are participating in a flight simulation in the Fixed Base (FB) Shuttle Mission Simulator (SMS) located in JSC's Mission Simulation and Training Facility Bldg 5. Gregory in the commanders seat, Musgrave sitting on center console, and Henricks in the pilots seat look back toward the aft flight deck and the photographer. Seat backs appear in the foreground and forward control panels in the background.

  1. Bacterial gene abundances as indicators of greenhouse gas emission in soils.

    PubMed

    Morales, Sergio E; Cosart, Theodore; Holben, William E

    2010-06-01

    Nitrogen fixing and denitrifying bacteria, respectively, control bulk inputs and outputs of nitrogen in soils, thereby mediating nitrogen-based greenhouse gas emissions in an ecosystem. Molecular techniques were used to evaluate the relative abundances of nitrogen fixing, denitrifying and two numerically dominant ribotypes (based on the > or =97% sequence similarity at the 16S rRNA gene) of bacteria in plots representing 10 agricultural and other land-use practices at the Kellogg biological station long-term ecological research site. Quantification of nitrogen-related functional genes (nitrite reductase, nirS; nitrous oxide reductase, nosZ; and nitrogenase, nifH) as well as two dominant 16S ribotypes (belonging to the phyla Acidobacteria, Thermomicrobia) allowed us to evaluate the hypothesis that microbial community differences are linked to greenhouse gas emissions under different land management practices. Our results suggest that the successional stages of the ecosystem are strongly linked to bacterial functional group abundance, and that the legacy of agricultural practices can be sustained over decades. We also link greenhouse gas emissions with specific compositional responses in the soil bacterial community and assess the use of denitrifying gene abundances as proxies for determining nitrous oxide emissions from soils.

  2. The Multi-site All-Sky CAmeRA (MASCARA). Finding transiting exoplanets around bright (mV < 8) stars

    NASA Astrophysics Data System (ADS)

    Talens, G. J. J.; Spronck, J. F. P.; Lesage, A.-L.; Otten, G. P. P. L.; Stuik, R.; Pollacco, D.; Snellen, I. A. G.

    2017-05-01

    This paper describes the design, operations, and performance of the Multi-site All-Sky CAmeRA (MASCARA). Its primary goal is to find new exoplanets transiting bright stars, 4 < mV < 8, by monitoring the full sky. MASCARA consists of one northern station on La Palma, Canary Islands (fully operational since February 2015), one southern station at La Silla Observatory, Chile (operational from early 2017), and a data centre at Leiden Observatory in the Netherlands. Both MASCARA stations are equipped with five interline CCD cameras using wide field lenses (24 mm focal length) with fixed pointings, which together provide coverage down to airmass 3 of the local sky. The interline CCD cameras allow for back-to-back exposures, taken at fixed sidereal times with exposure times of 6.4 sidereal seconds. The exposures are short enough that the motion of stars across the CCD does not exceed one pixel during an integration. Astrometry and photometry are performed on-site, after which the resulting light curves are transferred to Leiden for further analysis. The final MASCARA archive will contain light curves for 70 000 stars down to mV = 8.4, with a precision of 1.5% per 5 minutes at mV = 8.

  3. 47 CFR 25.201 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... craft designed for traveling on water receiving from and transmitting to fixed-satellite space stations... an electronic form using Internet or World Wide Web on-line filing forms. Equivalent diameter. When... diameter of the antenna's main reflector. When non-reflector or non-circular aperture antennas are employed...

  4. 47 CFR 25.201 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... craft designed for traveling on water receiving from and transmitting to fixed-satellite space stations... an electronic form using Internet or World Wide Web on-line filing forms. Equivalent diameter. When... diameter of the antenna's main reflector. When non-reflector or non-circular aperture antennas are employed...

  5. 47 CFR 25.201 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... craft designed for traveling on water receiving from and transmitting to fixed-satellite space stations... an electronic form using Internet or World Wide Web on-line filing forms. Equivalent diameter. When... diameter of the antenna's main reflector. When non-reflector or non-circular aperture antennas are employed...

  6. An integrated voice and data multiple-access scheme for a land-mobile satellite system

    NASA Technical Reports Server (NTRS)

    Li, V. O. K.; Yan, T.-Y.

    1984-01-01

    An analytical study is performed of the satellite requirements for a land mobile satellite system (LMSS). The spacecraft (MSAT-X) would be in GEO and would be compatible with multiple access by mobile radios and antennas and fixed stations. The FCC has received a petition from NASA to reserve the 821-825 and 866-870 MHz frequencies for the LMSS, while communications with fixed earth stations would be in the Ku band. MSAT-X transponders would alter the frequencies of signal and do no processing in the original configuration considered. Channel use would be governed by an integrated demand-assigned, multiple access protocol, which would divide channels into reservation and information channels, governed by a network management center. Further analyses will cover tradeoffs between data and voice users, probability of blocking, and the performance impacts of on-board switching and variable bandwidth assignment. Initial calculations indicate that a large traffic volume can be handled with acceptable delays and voice blocking probabilities.

  7. An integrated voice and data multiple-access scheme for a land-mobile satellite system

    NASA Astrophysics Data System (ADS)

    Li, V. O. K.; Yan, T.-Y.

    1984-11-01

    An analytical study is performed of the satellite requirements for a land mobile satellite system (LMSS). The spacecraft (MSAT-X) would be in GEO and would be compatible with multiple access by mobile radios and antennas and fixed stations. The FCC has received a petition from NASA to reserve the 821-825 and 866-870 MHz frequencies for the LMSS, while communications with fixed earth stations would be in the Ku band. MSAT-X transponders would alter the frequencies of signal and do no processing in the original configuration considered. Channel use would be governed by an integrated demand-assigned, multiple access protocol, which would divide channels into reservation and information channels, governed by a network management center. Further analyses will cover tradeoffs between data and voice users, probability of blocking, and the performance impacts of on-board switching and variable bandwidth assignment. Initial calculations indicate that a large traffic volume can be handled with acceptable delays and voice blocking probabilities.

  8. Determination of velocity correction factors for real-time air velocity monitoring in underground mines.

    PubMed

    Zhou, Lihong; Yuan, Liming; Thomas, Rick; Iannacchione, Anthony

    2017-12-01

    When there are installations of air velocity sensors in the mining industry for real-time airflow monitoring, a problem exists with how the monitored air velocity at a fixed location corresponds to the average air velocity, which is used to determine the volume flow rate of air in an entry with the cross-sectional area. Correction factors have been practically employed to convert a measured centerline air velocity to the average air velocity. However, studies on the recommended correction factors of the sensor-measured air velocity to the average air velocity at cross sections are still lacking. A comprehensive airflow measurement was made at the Safety Research Coal Mine, Bruceton, PA, using three measuring methods including single-point reading, moving traverse, and fixed-point traverse. The air velocity distribution at each measuring station was analyzed using an air velocity contour map generated with Surfer ® . The correction factors at each measuring station for both the centerline and the sensor location were calculated and are discussed.

  9. Determination of velocity correction factors for real-time air velocity monitoring in underground mines

    PubMed Central

    Yuan, Liming; Thomas, Rick; Iannacchione, Anthony

    2017-01-01

    When there are installations of air velocity sensors in the mining industry for real-time airflow monitoring, a problem exists with how the monitored air velocity at a fixed location corresponds to the average air velocity, which is used to determine the volume flow rate of air in an entry with the cross-sectional area. Correction factors have been practically employed to convert a measured centerline air velocity to the average air velocity. However, studies on the recommended correction factors of the sensor-measured air velocity to the average air velocity at cross sections are still lacking. A comprehensive airflow measurement was made at the Safety Research Coal Mine, Bruceton, PA, using three measuring methods including single-point reading, moving traverse, and fixed-point traverse. The air velocity distribution at each measuring station was analyzed using an air velocity contour map generated with Surfer®. The correction factors at each measuring station for both the centerline and the sensor location were calculated and are discussed. PMID:29201495

  10. ELF signals from the Central Italy Electromagnetic Network (CIEN) at the time of the 2012 Emilia-Romagna earthquakes

    NASA Astrophysics Data System (ADS)

    Fidani, Cristiano

    2013-04-01

    A network devoted to a continuous monitoring of LF, VLF transmitters and ELF signals was set up in Central Italy, and has been operating since 2006, which is currently composed of 9 stations in 9 different Italian cities. From the beginning of 2012, improvements have been carried out on the stability of CIEN by updating all the stations with UPS and web connections. Moreover, a reduction in the amount of data stored was performed so to permit a real time monitoring of the network by web. Specifically, a 100kb/day was fixed to record the VLF power spectra intervals around the transmitter frequencies every 5 minutes. Similarly, a 600kb/day was fixed to record the ELF power spectra intervals, which was logarithmic spaced in frequency every 5 seconds. Furthermore, different physical measurements at each CIEN site have been recently initiated to better understand the sources of some signals. In order to do so, the Fermo and Torre Pellice stations have been equipped with Geiger counters to monitor atmospheric radioactivity, underground thermometers, as well as meteorological stations to record atmospheric temperature, humidity, wind speed and direction, along with atmospheric pressure and rainfall. The Torre Pellice Station had already been equipped with a magnetometer, a Radon-meter and a compass to check the direction of the geomagnetic field. The Chieti station had already been equipped with a magnetometer and an underground current detector. The Perugia and Rieti stations had already been equipped with seismometers and a network to capture transient luminous phenomena in the atmosphere. On May 20th and 29th 2012, two strong earthquakes struck the Emilia-Romagna Region with a magnitude M=5.9 and M=5.8, respectively. The earthquakes caused 27 fatal causalities and significant ground failures. The observations relative to this seismic period were investigated relative to their ELF band electric fields. Observations were thoroughly analysed from the Zocca station, the closest (50km) CIEN monitoring station to the Emilia-Romagna epicenter. Date from other stations were examined to reveal any possible differences. Many horizontal electric oscillations from April 1 - June 30, 2012, were seen. Most of these appeared at the time of rainfalls, which were revealed by the Zocca station on the same days. Electric oscillations under 100 Hz appeared from May 10 - 11, 2012, when there was no recorded meteorological activity. On May 26, 2012, strong ELF oscillations occurred at the Zocca station. This station had not detected ELF horizontal oscillations for many years prior to Emilia-Romagna seismic events in May 2012. Whereas, signals were revealed in mid-April 2012 and increased in number and intensity around the dates of the quakes.

  11. Continuous GPS observations in Tohoku University and recovery effort after the 2011 off the Pacific coast of Tohoku Earthquake

    NASA Astrophysics Data System (ADS)

    Demachi, T.; Miura, S.; Ohta, Y.; Tachibana, K.; Ueki, S.; Sato, T.; Ohzono, M.; Umino, N.

    2012-04-01

    The nation-wide GPS observation network which is named GPS Earth Observation Network System (GEONET) has been established by the Geospatial Information Authority of Japan (GSI) (Miyazaki et al., 1997). The network composed more than 1,200 stations with baseline length is about 20-25 km. Tohoku University has also conducted continuous GPS observations since 1987 in the Tohoku district, Northeastern Japan (Miura et al., 1993). Recently, to investigate short-length crustal deformations such as volcanic deformation, co- and post-seismic deformation of M6-7 class earthquakes and inter-seismic deformations, we have deployed continuous GPS observation stations to complement the location of GEONET stations (Miura et al. 2000, 2002, and 2004). We installed GPS receiver, PC for data logging (ALIX series, PC Engines GmbH) and re-booter (e.g., WATCH BOOT nino, Meikyo Electric Co., Ltd.) in each station. We have secure and stable online access to each station from our university (Sendai city, Japan) using IP-VPN over fixed telephone lines (FLET'S Office service, Nippon Telegraph and Telephone East Corp.). Through this network, the data are transferred to our university and we can restart the devices if the devices hang up. Since 2010, we have tried to use on-line system through internet by prepaid mobile data-communication (b-mobile3G and b-mobileSIM U300, Japan Communications Inc.) in eight observation stations. Compared with the FLET'S Office service, we can conveniently and inexpensively establish wherever the mobile phone service is provided. The two stations are located in volcanoes, we activate the network system for an hour in every day using motor time switch, because of these devices are operated by limited DC power supplies through solar cell. In other six stations, we can use commercial AC power supplies, so that data connections are always available. On March 11, 2011, the 2011 off the Pacific coast of Tohoku Earthquake (Mw 9.0) occurred and a huge tsunami caused more than 19,000 dead and missing. After the main shock, the electricity failure and communication failure occurred in almost entire the Tohoku district. We obtained the GPS data of co-seismic and immediately after the main shock in only about 10% of our stations. Our observations resumed automatically in inland area as the electricity supply was resumed, while near the Pacific coastal area, recovery efforts were needed on site for resuming the observations. We carried out recovery effort in this area after March 20 when the essential utilities were almost repaired in Sendai city except tsunami-hit area. We used DC power supplies through solar cell and batteries and the prepaid mobile data-communication to operate GPS receivers and transfer data. This system is very useful in the area where fixed telephone and electric wires aren't reconstructed, because of the service of mobile phone is restored faster than fixed telephone service. We could resume the observations in almost all of our stations by April 1. Currently, we have been constructing redundant system of power supply using batteries to avoid data missing owing to electricity failure. We need to construct redundant network system in future.

  12. 47 CFR 15.711 - Interference avoidance mechanisms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-service monitoring. (5) Channel move time. After a wireless microphone or other low power auxiliary device... Class A, low power, translator and booster stations; translator receive operations; fixed broadcast... border areas near Canada and Mexico in accordance with § 15.712(g). (2) For low power auxiliary services...

  13. 47 CFR 90.469 - Unattended operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MOBILE RADIO SERVICES Transmitter Control § 90.469 Unattended operation. (a) Subject to the provisions of §§ 90.243, 90.245, and 90.247, mobile relay, fixed relay, and mobile repeater stations are authorized... where they are activated by either electrical or mechanical devices, provided the licensee adopts...

  14. 78 FR 44028 - Review of Foreign Ownership Policies for Common Carrier and Aeronautical Radio Licensees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-23

    ... Foreign Ownership Policies for Common Carrier and Aeronautical Radio Licensees AGENCY: Federal... route and aeronautical fixed radio station licensees. DATES: Effective on August 9, 2013. FOR FURTHER... following corrections are made: Subpart F--Wireless Radio Services Applications and Proceedings [Corrected...

  15. 47 CFR 101.1425 - RF safety.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false RF safety. 101.1425 Section 101.1425 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... safety. MVDDS stations in the 12.2-12.7 GHz frequency band do not operate with output powers that equal...

  16. 47 CFR 101.1425 - RF safety.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false RF safety. 101.1425 Section 101.1425 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE... safety. MVDDS stations in the 12.2-12.7 GHz frequency band do not operate with output powers that equal...

  17. Language Labs for 1990: User-Friendly, Expandable and Affordable.

    ERIC Educational Resources Information Center

    Wiley, Patricia Davis

    1990-01-01

    Describes hardware available for school laboratories used for second-language learning. Vendors and prices for equipment ranging from simple audio to computer interactive capabilities are included, portable and fixed installations are reviewed, specifications for instructor consoles and student stations are suggested, and maintenance and repair…

  18. 47 CFR 74.502 - Frequency assignment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... meet the capability or quality requirements. (c) Aural broadcast STL and intercity relay stations that... are not entitled to protection from fixed-satellite service operations and must not cause unacceptable... protection criteria in § 101.105(a), (b), and (c) of this chapter and the frequency usage coordination...

  19. 47 CFR 74.502 - Frequency assignment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... meet the capability or quality requirements. (c) Aural broadcast STL and intercity relay stations that... are not entitled to protection from fixed-satellite service operations and must not cause unacceptable... protection criteria in § 101.105(a), (b), and (c) of this chapter and the frequency usage coordination...

  20. Fronthaul evolution: From CPRI to Ethernet

    NASA Astrophysics Data System (ADS)

    Gomes, Nathan J.; Chanclou, Philippe; Turnbull, Peter; Magee, Anthony; Jungnickel, Volker

    2015-12-01

    It is proposed that using Ethernet in the fronthaul, between base station baseband unit (BBU) pools and remote radio heads (RRHs), can bring a number of advantages, from use of lower-cost equipment, shared use of infrastructure with fixed access networks, to obtaining statistical multiplexing and optimised performance through probe-based monitoring and software-defined networking. However, a number of challenges exist: ultra-high-bit-rate requirements from the transport of increased bandwidth radio streams for multiple antennas in future mobile networks, and low latency and jitter to meet delay requirements and the demands of joint processing. A new fronthaul functional division is proposed which can alleviate the most demanding bit-rate requirements by transport of baseband signals instead of sampled radio waveforms, and enable statistical multiplexing gains. Delay and synchronisation issues remain to be solved.

Top