Utilization Bound of Non-preemptive Fixed Priority Schedulers
NASA Astrophysics Data System (ADS)
Park, Moonju; Chae, Jinseok
It is known that the schedulability of a non-preemptive task set with fixed priority can be determined in pseudo-polynomial time. However, since Rate Monotonic scheduling is not optimal for non-preemptive scheduling, the applicability of existing polynomial time tests that provide sufficient schedulability conditions, such as Liu and Layland's bound, is limited. This letter proposes a new sufficient condition for non-preemptive fixed priority scheduling that can be used for any fixed priority assignment scheme. It is also shown that the proposed schedulability test has a tighter utilization bound than existing test methods.
An Analysis of Task-Scheduling for a Generic Avionics Mission Computer
2006-04-01
3 3. 1. 3 Response Time Analysis........................................................................... 8 3. 2 Non - Preemptive ...Fixed Priority Scheduling ...................................................... 10 3. 2. 1 Simple Non - Preemptive Response Time Test...10 3. 2. 2 Non - Preemptive Response Time Test .................................................. 12 3. 3 Asynchronous Fixed
1990-10-01
to economic, technological, spatial or logistic concerns, or involve training, man-machine interfaces, or integration into existing systems. Once the...probabilistic reasoning, mixed analysis- and simulation-oriented, mixed computation- and communication-oriented, nonpreemptive static priority...scheduling base, nonrandomized, preemptive static priority scheduling base, randomized, simulation-oriented, and static scheduling base. The selection of both
New preemptive scheduling for OBS networks considering cascaded wavelength conversion
NASA Astrophysics Data System (ADS)
Gao, Xingbo; Bassiouni, Mostafa A.; Li, Guifang
2009-05-01
In this paper we introduce a new preemptive scheduling technique for next generation optical burst-switched networks considering the impact of cascaded wavelength conversions. It has been shown that when optical bursts are transmitted all optically from source to destination, each wavelength conversion performed along the lightpath may cause certain signal-to-noise deterioration. If the distortion of the signal quality becomes significant enough, the receiver would not be able to recover the original data. Accordingly, subject to this practical impediment, we improve a recently proposed fair channel scheduling algorithm to deal with the fairness problem and aim at burst loss reduction simultaneously in optical burst switching. In our scheme, the dynamic priority associated with each burst is based on a constraint threshold and the number of already conducted wavelength conversions among other factors for this burst. When contention occurs, a new arriving superior burst may preempt another scheduled one according to their priorities. Extensive simulation results have shown that the proposed scheme further improves fairness and achieves burst loss reduction as well.
RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.
2008-08-01
RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.
OGUPSA sensor scheduling architecture and algorithm
NASA Astrophysics Data System (ADS)
Zhang, Zhixiong; Hintz, Kenneth J.
1996-06-01
This paper introduces a new architecture for a sensor measurement scheduler as well as a dynamic sensor scheduling algorithm called the on-line, greedy, urgency-driven, preemptive scheduling algorithm (OGUPSA). OGUPSA incorporates a preemptive mechanism which uses three policies, (1) most-urgent-first (MUF), (2) earliest- completed-first (ECF), and (3) least-versatile-first (LVF). The three policies are used successively to dynamically allocate and schedule and distribute a set of arriving tasks among a set of sensors. OGUPSA also can detect the failure of a task to meet a deadline as well as generate an optimal schedule in the sense of minimum makespan for a group of tasks with the same priorities. A side benefit is OGUPSA's ability to improve dynamic load balance among all sensors while being a polynomial time algorithm. Results of a simulation are presented for a simple sensor system.
NASA Technical Reports Server (NTRS)
Davari, Sadegh; Sha, Lui
1992-01-01
In the design of real-time systems, tasks are often assigned priorities. Preemptive priority driven schedulers are used to schedule tasks to meet the timing requirements. Priority inversion is the term used to describe the situation when a higher priority task's execution is delayed by lower priority tasks. Priority inversion can occur when there is contention for resources among tasks of different priorities. The duration of priority inversion could be long enough to cause tasks to miss their dead lines. Priority inversion cannot be completely eliminated. However, it is important to identify sources of priority inversion and minimize the duration of priority inversion. In this paper, a comprehensive review of the problem of and solutions to unbounded priority inversion is presented.
NASA Astrophysics Data System (ADS)
Gao, Xingbo
2010-03-01
We introduce a new preemptive scheduling technique for next-generation optical burst switching (OBS) networks considering the impact of cascaded wavelength conversions. It has been shown that when optical bursts are transmitted all optically from source to destination, each wavelength conversion performed along the lightpath may cause certain signal-to-noise deterioration. If the distortion of the signal quality becomes significant enough, the receiver would not be able to recover the original data. Accordingly, subject to this practical impediment, we improve a recently proposed fair channel scheduling algorithm to deal with the fairness problem and aim at burst loss reduction simultaneously in OBS environments. In our scheme, the dynamic priority associated with each burst is based on a constraint threshold and the number of already conducted wavelength conversions among other factors for this burst. When contention occurs, a new arriving superior burst may preempt another scheduled one according to their priorities. Extensive simulation results have shown that the proposed scheme further improves fairness and achieves burst loss reduction as well.
Segment Fixed Priority Scheduling for Self Suspending Real Time Tasks
2016-08-11
Segment-Fixed Priority Scheduling for Self-Suspending Real -Time Tasks Junsung Kim, Department of Electrical and Computer Engineering, Carnegie...4 2.1 Application of a Multi-Segment Self-Suspending Real -Time Task Model ............................. 5 3 Fixed Priority Scheduling...1 Figure 2: A multi-segment self-suspending real -time task model
Seol, Ye-In; Kim, Young-Kuk
2014-01-01
Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10-80% over the existing algorithms.
2014-01-01
Power-aware scheduling reduces CPU energy consumption in hard real-time systems through dynamic voltage scaling (DVS). In this paper, we deal with pinwheel task model which is known as static and predictable task model and could be applied to various embedded or ubiquitous systems. In pinwheel task model, each task's priority is static and its execution sequence could be predetermined. There have been many static approaches to power-aware scheduling in pinwheel task model. But, in this paper, we will show that the dynamic priority scheduling results in power-aware scheduling could be applied to pinwheel task model. This method is more effective than adopting the previous static priority scheduling methods in saving energy consumption and, for the system being still static, it is more tractable and applicable to small sized embedded or ubiquitous computing. Also, we introduce a novel power-aware scheduling algorithm which exploits all slacks under preemptive earliest-deadline first scheduling which is optimal in uniprocessor system. The dynamic priority method presented in this paper could be applied directly to static systems of pinwheel task model. The simulation results show that the proposed algorithm with the algorithmic complexity of O(n) reduces the energy consumption by 10–80% over the existing algorithms. PMID:25121126
Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A
2017-03-01
Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.
Ada Quality and Style: Guidelines for Professional Programmers, Version 02.01.01
1992-12-01
47, 78, 79 predicate queue , entry not prioritized, 95 as function name, 22 for boolean object, 21 R preemptive scheduling. 118 race condition. 49...when lower priority tasks are given service while higher priority tasks remain blocked. In the above example, this occurred because entry queues are...from an entry queue 100 Ada QUALITY AND STYLE due to execution of an abort statement as well as expiration of a timed entry call. The use of this
NASA Astrophysics Data System (ADS)
Swaraj Pati, Mythili N.; Korde, Pranav; Dey, Pallav
2017-11-01
The purpose of this paper is to introduce an optimised variant to the round robin scheduling algorithm. Every algorithm works in its own way and has its own merits and demerits. The proposed algorithm overcomes the shortfalls of the existing scheduling algorithms in terms of waiting time, turnaround time, throughput and number of context switches. The algorithm is pre-emptive and works based on the priority of the associated processes. The priority is decided on the basis of the remaining burst time of a particular process, that is; lower the burst time, higher the priority and higher the burst time, lower the priority. To complete the execution, a time quantum is initially specified. In case if the burst time of a particular process is less than 2X of the specified time quantum but more than 1X of the specified time quantum; the process is given high priority and is allowed to execute until it completes entirely and finishes. Such processes do not have to wait for their next burst cycle.
A Model and Algorithms For a Software Evolution Control System
1993-12-01
dynamic scheduling approaches can be found in [67). Task scheduling can also be characterized as preemptive and nonpreemptive . A task is preemptive ...is NP-hard for both the preemptive and nonpreemptive cases [671 [84). Scheduling nonpreemptive tasks with arbitrary ready times is NP-hard in both...the preemptive and nonpreemptive cases [671 [841. Scheduling nonpreemptive tasks with arbitrary ready times is NP-hard in both multiprocessor and
Hard real-time beam scheduler enables adaptive images in multi-probe systems
NASA Astrophysics Data System (ADS)
Tobias, Richard J.
2014-03-01
Real-time embedded-system concepts were adapted to allow an imaging system to responsively control the firing of multiple probes. Large-volume, operator-independent (LVOI) imaging would increase the diagnostic utility of ultrasound. An obstacle to this innovation is the inability of current systems to drive multiple transducers dynamically. Commercial systems schedule scanning with static lists of beams to be fired and processed; here we allow an imager to adapt to changing beam schedule demands, as an intelligent response to incoming image data. An example of scheduling changes is demonstrated with a flexible duplex mode two-transducer application mimicking LVOI imaging. Embedded-system concepts allow an imager to responsively control the firing of multiple probes. Operating systems use powerful dynamic scheduling algorithms, such as fixed priority preemptive scheduling. Even real-time operating systems lack the timing constraints required for ultrasound. Particularly for Doppler modes, events must be scheduled with sub-nanosecond precision, and acquired data is useless without this requirement. A successful scheduler needs unique characteristics. To get close to what would be needed in LVOI imaging, we show two transducers scanning different parts of a subjects leg. When one transducer notices flow in a region where their scans overlap, the system reschedules the other transducer to start flow mode and alter its beams to get a view of the observed vessel and produce a flow measurement. The second transducer does this in a focused region only. This demonstrates key attributes of a successful LVOI system, such as robustness against obstructions and adaptive self-correction.
Facilitating preemptive hardware system design using partial reconfiguration techniques.
Dondo Gazzano, Julio; Rincon, Fernando; Vaderrama, Carlos; Villanueva, Felix; Caba, Julian; Lopez, Juan Carlos
2014-01-01
In FPGA-based control system design, partial reconfiguration is especially well suited to implement preemptive systems. In real-time systems, the deadline for critical task can compel the preemption of noncritical one. Besides, an asynchronous event can demand immediate attention and, then, force launching a reconfiguration process for high-priority task implementation. If the asynchronous event is previously scheduled, an explicit activation of the reconfiguration process is performed. If the event cannot be previously programmed, such as in dynamically scheduled systems, an implicit activation to the reconfiguration process is demanded. This paper provides a hardware-based approach to explicit and implicit activation of the partial reconfiguration process in dynamically reconfigurable SoCs and includes all the necessary tasks to cope with this issue. Furthermore, the reconfiguration service introduced in this work allows remote invocation of the reconfiguration process and then the remote integration of off-chip components. A model that offers component location transparency is also presented to enhance and facilitate system integration.
Facilitating Preemptive Hardware System Design Using Partial Reconfiguration Techniques
Rincon, Fernando; Vaderrama, Carlos; Villanueva, Felix; Caba, Julian; Lopez, Juan Carlos
2014-01-01
In FPGA-based control system design, partial reconfiguration is especially well suited to implement preemptive systems. In real-time systems, the deadline for critical task can compel the preemption of noncritical one. Besides, an asynchronous event can demand immediate attention and, then, force launching a reconfiguration process for high-priority task implementation. If the asynchronous event is previously scheduled, an explicit activation of the reconfiguration process is performed. If the event cannot be previously programmed, such as in dynamically scheduled systems, an implicit activation to the reconfiguration process is demanded. This paper provides a hardware-based approach to explicit and implicit activation of the partial reconfiguration process in dynamically reconfigurable SoCs and includes all the necessary tasks to cope with this issue. Furthermore, the reconfiguration service introduced in this work allows remote invocation of the reconfiguration process and then the remote integration of off-chip components. A model that offers component location transparency is also presented to enhance and facilitate system integration. PMID:24672292
Non preemptive soft real time scheduler: High deadline meeting rate on overload
NASA Astrophysics Data System (ADS)
Khalib, Zahereel Ishwar Abdul; Ahmad, R. Badlishah; El-Shaikh, Mohamed
2015-05-01
While preemptive scheduling has gain more attention among researchers, current work in non preemptive scheduling had shown promising result in soft real time jobs scheduling. In this paper we present a non preemptive scheduling algorithm meant for soft real time applications, which is capable of producing better performance during overload while maintaining excellent performance during normal load. The approach taken by this algorithm has shown more promising results compared to other algorithms including its immediate predecessor. We will present the analysis made prior to inception of the algorithm as well as simulation results comparing our algorithm named gutEDF with EDF and gEDF. We are convinced that grouping jobs utilizing pure dynamic parameters would produce better performance.
Butt, Muhammad Arif; Akram, Muhammad
2016-01-01
We present a new intuitionistic fuzzy rule-based decision-making system based on intuitionistic fuzzy sets for a process scheduler of a batch operating system. Our proposed intuitionistic fuzzy scheduling algorithm, inputs the nice value and burst time of all available processes in the ready queue, intuitionistically fuzzify the input values, triggers appropriate rules of our intuitionistic fuzzy inference engine and finally calculates the dynamic priority (dp) of all the processes in the ready queue. Once the dp of every process is calculated the ready queue is sorted in decreasing order of dp of every process. The process with maximum dp value is sent to the central processing unit for execution. Finally, we show complete working of our algorithm on two different data sets and give comparisons with some standard non-preemptive process schedulers.
From non-preemptive to preemptive scheduling using synchronization synthesis.
Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten
2017-01-01
We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.
Space Shuttle processing - A case study in artificial intelligence
NASA Technical Reports Server (NTRS)
Mollikarimi, Cindy; Gargan, Robert; Zweben, Monte
1991-01-01
A scheduling system incorporating AI is described and applied to the automated processing of the Space Shuttle. The unique problem of addressing the temporal, resource, and orbiter-configuration requirements of shuttle processing is described with comparisons to traditional project management for manufacturing processes. The present scheduling system is developed to handle the late inputs and complex programs that characterize shuttle processing by incorporating fixed preemptive scheduling, constraint-based simulated annealing, and the characteristics of an 'anytime' algorithm. The Space-Shuttle processing environment is modeled with 500 activities broken down into 4000 subtasks and with 1600 temporal constraints, 8000 resource constraints, and 3900 state requirements. The algorithm is shown to scale to very large problems and maintain anytime characteristics suggesting that an automated scheduling process is achievable and potentially cost-effective.
Evaluations of Some Scheduling Algorithms for Hard Real-Time Systems
1990-06-01
construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules, the...optimal value of Tmax in the preemptive case is at least a lower bound on the optimal Tmax for the nonpreemptive schedules. This principle is the basis...23 b. Nonpreemptable Version .............................................. 24 4. The Minimize Maximum Tardiness with Earliest Start
Compilation time analysis to minimize run-time overhead in preemptive scheduling on multiprocessors
NASA Astrophysics Data System (ADS)
Wauters, Piet; Lauwereins, Rudy; Peperstraete, J.
1994-10-01
This paper describes a scheduling method for hard real-time Digital Signal Processing (DSP) applications, implemented on a multi-processor. Due to the very high operating frequencies of DSP applications (typically hundreds of kHz) runtime overhead should be kept as small as possible. Because static scheduling introduces very little run-time overhead it is used as much as possible. Dynamic pre-emption of tasks is allowed if and only if it leads to better performance in spite of the extra run-time overhead. We essentially combine static scheduling with dynamic pre-emption using static priorities. Since we are dealing with hard real-time applications we must be able to guarantee at compile-time that all timing requirements will be satisfied at run-time. We will show that our method performs at least as good as any static scheduling method. It also reduces the total amount of dynamic pre-emptions compared with run time methods like deadline monotonic scheduling.
1989-12-01
to construct because the mechanism is a dispatching procedure. Since all nonpreemptive schedules are contained in the set of all preemptive schedules...the optimal value of T’.. in the preemptive case is at least a lower bound on the optimal T., for the nonpreemptive schedules. This principle is the...adapt to changes in the enviro.nment. In hard real-time systems, tasks are also distinguished as preemptable and nonpreemptable . A task is preemptable
Solving cyclical nurse scheduling problem using preemptive goal programming
NASA Astrophysics Data System (ADS)
Sundari, V. E.; Mardiyati, S.
2017-07-01
Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.
1982-10-01
class queueing system with a preemptive -resume priority service discipline, as depicted in Figure 4.2. Concerning a SPLICLAN configuration a node can...processor can be modeled as a single resource, multi-class queueing system with a preemptive -resume priority structure as the one given in Figure 4.2. An...LOCAL AREA NETWORK DESIGN IN SUPPORT OF STOCK POINT LOGISTICS INTEGRATED COMMUNICATIONS ENVIRONMENT (SPLICE) by Ioannis Th. Mastrocostopoulos October
Scheduling periodic jobs that allow imprecise results
NASA Technical Reports Server (NTRS)
Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay
1990-01-01
The problem of scheduling periodic jobs in hard real-time systems that support imprecise computations is discussed. Two workload models of imprecise computations are presented. These models differ from traditional models in that a task may be terminated any time after it has produced an acceptable result. Each task is logically decomposed into a mandatory part followed by an optional part. In a feasible schedule, the mandatory part of every task is completed before the deadline of the task. The optional part refines the result produced by the mandatory part to reduce the error in the result. Applications are classified as type N and type C, according to undesirable effects of errors. The two workload models characterize the two types of applications. The optional parts of the tasks in an N job need not ever be completed. The resulting quality of each type-N job is measured in terms of the average error in the results over several consecutive periods. A class of preemptive, priority-driven algorithms that leads to feasible schedules with small average error is described and evaluated.
He, Feng; Zhao, Lin; Li, Ershuai
2017-01-01
Ethernet-AVB/TSN (Audio Video Bridging/Time-Sensitive Networking) and AFDX (Avionics Full DupleX switched Ethernet) are switched Ethernet technologies, which are both candidates for real-time communication in the context of transportation systems. AFDX implements a fixed priority scheduling strategy with two priority levels. Ethernet-AVB/TSN supports a similar fixed priority scheduling with an additional Credit-Based Shaper (CBS) mechanism. Besides, TSN can support time-triggered scheduling strategy. One direct effect of CBS mechanism is to increase the delay of its flows while decreasing the delay of other priority ones. The former effect can be seen as the shaping restriction and the latter effect can be seen as the shaping benefit from CBS. The goal of this paper is to investigate the impact of CBS on different priority flows, especially on the intermediate priority ones, as well as the effect of CBS bandwidth allocation. It is based on a performance comparison of AVB/TSN and AFDX by simulation in an automotive case study. Furthermore, the shaping benefit is modeled based on integral operation from network calculus perspective. Combing with the analysis of shaping restriction and shaping benefit, some configuration suggestions on the setting of CBS bandwidth are given. Results show that the effect of CBS depends on flow loads and CBS configurations. A larger load of high priority flows in AVB tends to a better performance for the intermediate priority flows when compared with AFDX. Shaping benefit can be explained and calculated according to the changing from the permitted maximum burst. PMID:28531158
An Implementation of Wireless Body Area Networks for Improving Priority Data Transmission Delay.
Gündoğdu, Köksal; Çalhan, Ali
2016-03-01
The rapid growth of wireless sensor networks has enabled the human health monitoring of patients using body sensor nodes that gather and evaluate human body parameters and movements. This study describes both simulation model and implementation of a new traffic sensitive wireless body area network by using non-preemptive priority queue discipline. A wireless body area network implementation employing TDMA is designed with three different priorities of data traffics. Besides, a coordinator node having the non-preemptive priority queue is performed in this study. We have also developed, modeled and simulated example network scenarios by using the Riverbed Modeler simulation software with the purpose of verifying the implementation results. The simulation results obtained under various network load conditions are consistent with the implementation results.
NASA Astrophysics Data System (ADS)
Yuvarani, S.; Saravanarajan, M. C.
2017-11-01
This paper concerned with performance analysis of single server preemptive priority retrial queue with a single vacation where two types of customers are considered and they are called priority customers and ordinary customers. The ordinary customers arrive in batch into the system. The priority customers do not form any queue. After the completion of regular service, the customers may demand re-service for the previous service without joining the orbit or may leave the system. As soon as the system is empty, the server goes for vacation and the regular busy server can be subjected to breakdown. By using the supplementary variable technique, we obtain the steady-state probability generating functions for the system/orbit size. Some important system performance measures and the stochastic decomposition are discussed. Finally, numerical examples are presented to visualize the effect of parameters on system performance measures.
Steady-State Algorithmic Analysis M/M/c Two-Priority Queues with Heterogeneous Rates.
1981-04-21
ALGORITHMIC ANALYSIS OF M/M/c TWO-PRIORITY QUEUES WITH HETEROGENEOUS RATES by Douglas R. Miller An algorithm for steady-state analysis of M/M/c nonpreemptive ...practical algorithm for systems involving more than two priority classes. The preemptive case is simpler than the nonpreemptive case; an algorithm for it...priority nonpreemptive queueing system with arrival rates 1 and X2 and service rates V and p42 * The state space can be described as follows. Let xi,j,k be
Binary Trees and Parallel Scheduling Algorithms.
1980-09-01
been pro- cessed for p. time units. If a job does not complete by its due time, it is tardy. In a nonpreemptive schedule, job i is scheduled to process...the preemptive schedule obtained by the algorithm of section 2.1.2 also minimizes 5Ti, this problem is easily solved in parallel. When lci is to e...August 1978, pp. 657-661. 14. Horn, W. A., "Some simple scheduling algorithms," Naval Res. Logist . Qur., Vol. 21, pp. 177-185, 1974. i5. Hforowitz, E
2010-01-01
Background and Objective Our objective was to report on the design and essentials of the Etoricoxib protocol- Preemptive and Postoperative Analgesia (EPPA) Trial, investigating whether preemptive analgesia with cox-2 inhibitors is more efficacious than placebo in patients who receive either laparotomy or thoracotomy. Design and Methods The study is a 2 × 2 factorial armed, double blinded, bicentric, randomised placebo-controlled trial comparing (a) etoricoxib and (b) placebo in a pre- and postoperative setting. The total observation period is 6 months. According to a power analysis, 120 patients scheduled for abdominal or thoracic surgery will randomly be allocated to either the preemptive or the postoperative treatment group. These two groups are each divided into two arms. Preemptive group patients receive etoricoxib prior to surgery and either etoricoxib again or placebo postoperatively. Postoperative group patients receive placebo prior to surgery and either placebo again or etoricoxib after surgery (2 × 2 factorial study design). The Main Outcome Measure is the cumulative use of morphine within the first 48 hours after surgery (measured by patient controlled analgesia PCA). Secondary outcome parameters include a broad range of tests including sensoric perception and genetic polymorphisms. Discussion The results of this study will provide information on the analgesic effectiveness of etoricoxib in preemptive analgesia and will give hints on possible preventive effects of persistent pain. Trial registration NCT00716833 PMID:20504378
A comparison of multiprocessor scheduling methods for iterative data flow architectures
NASA Technical Reports Server (NTRS)
Storch, Matthew
1993-01-01
A comparative study is made between the Algorithm to Architecture Mapping Model (ATAMM) and three other related multiprocessing models from the published literature. The primary focus of all four models is the non-preemptive scheduling of large-grain iterative data flow graphs as required in real-time systems, control applications, signal processing, and pipelined computations. Important characteristics of the models such as injection control, dynamic assignment, multiple node instantiations, static optimum unfolding, range-chart guided scheduling, and mathematical optimization are identified. The models from the literature are compared with the ATAMM for performance, scheduling methods, memory requirements, and complexity of scheduling and design procedures.
Ada Quality and Style: Guidelines for Professional Programmers
1991-01-01
occured because entry queues are serviced in FIFO order, not by priority. There is another situation referred to as a race condition. A program like the...the value of ’COUNT. A task can be removed from an entry queue due to execution of an abort statement as well as expiration of a timed entry call. The...is not defined by the language and may vary from time sliced to preemptive priority. Some implementations (e.g., VAX Ada) provide several choices
Al Oweidi, Abdelkarim S; Klasen, Joachim; Al-Mustafa, Mahmoud M; Abu-Halaweh, Sami A; Al-Zaben, Khaled R; Massad, Islam M; Qudaisat, Ibrahim Y
2010-06-01
Recent studies suggest that preemptive analgesia may be effective in reducing postoperative pain. One physiologic explanation may be interference with the endogenous opioid response. We investigated whether long-lasting preoperative preemptive analgesia may have an effect on the hormonal stress response after total hip replacement. 42 patients scheduled for elective hip replacement for coxarthrosis were randomized to receive, on the day before the operation, either 5 ml*h(-1) ropivacaine 0.2% (study group, n = 21) or 5 ml*h(-1) saline (control group, n = 21). Postoperative analgesia was achieved in both groups by patient-controlled epidural analgesia (PCEA) with ropivacaine 0.2%. The main outcome measure was the concentration of authentic beta-endorphin [1-31] in plasma up to 4 days after surgery. Additional parameters included concentrations of adrenocorticotrope hormone and cortisol. Both groups were comparable concerning preoperative parameters and pain scores. Epidural blocks were sufficient in all patients for operative analgesia. Preemptive analgesia was performed for 11-20 hours in both groups and led to significantly decreased pain scores before surgery. Preemptive analgesia with epidural ropivacaine did not lead to decreased concentrations of beta-endorphin [1-31] before the start of surgery or in the postoperative period. Furthermore, no differences could be detected in the time course of beta-endorphin and adrenocorticotrope hormone after surgery. However, cortisol concentrations differed significantly between groups before the operation, but showed a comparable rise after surgery. Differences in postoperative pain after preemptive analgesia do not seem to be due to an altered endogenous opioid response.
NASA Astrophysics Data System (ADS)
Ausaf, Muhammad Farhan; Gao, Liang; Li, Xinyu
2015-12-01
For increasing the overall performance of modern manufacturing systems, effective integration of process planning and scheduling functions has been an important area of consideration among researchers. Owing to the complexity of handling process planning and scheduling simultaneously, most of the research work has been limited to solving the integrated process planning and scheduling (IPPS) problem for a single objective function. As there are many conflicting objectives when dealing with process planning and scheduling, real world problems cannot be fully captured considering only a single objective for optimization. Therefore considering multi-objective IPPS (MOIPPS) problem is inevitable. Unfortunately, only a handful of research papers are available on solving MOIPPS problem. In this paper, an optimization algorithm for solving MOIPPS problem is presented. The proposed algorithm uses a set of dispatching rules coupled with priority assignment to optimize the IPPS problem for various objectives like makespan, total machine load, total tardiness, etc. A fixed sized external archive coupled with a crowding distance mechanism is used to store and maintain the non-dominated solutions. To compare the results with other algorithms, a C-matric based method has been used. Instances from four recent papers have been solved to demonstrate the effectiveness of the proposed algorithm. The experimental results show that the proposed method is an efficient approach for solving the MOIPPS problem.
Better approximation guarantees for job-shop scheduling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Goldberg, L.A.; Paterson, M.; Srinivasan, A.
1997-06-01
Job-shop scheduling is a classical NP-hard problem. Shmoys, Stein & Wein presented the first polynomial-time approximation algorithm for this problem that has a good (polylogarithmic) approximation guarantee. We improve the approximation guarantee of their work, and present further improvements for some important NP-hard special cases of this problem (e.g., in the preemptive case where machines can suspend work on operations and later resume). We also present NC algorithms with improved approximation guarantees for some NP-hard special cases.
On-Line Scheduling of Parallel Machines
1990-11-01
machine without losing any work; this is referred to as the preemptive model. In contrast to the nonpreemptive model which we have considered in this paper...that there exists no schedule of length d. The 2-relaxed decision procedure is as follows. Put each job into the queue of the slowest machine Mk such...in their queues . If a machine’s queue is empty it takes jobs to process from the queue of the first machine that is slower than it and that has a
Preemptive spatial competition under a reproduction-mortality constraint.
Allstadt, Andrew; Caraco, Thomas; Korniss, G
2009-06-21
Spatially structured ecological interactions can shape selection pressures experienced by a population's different phenotypes. We study spatial competition between phenotypes subject to antagonistic pleiotropy between reproductive effort and mortality rate. The constraint we invoke reflects a previous life-history analysis; the implied dependence indicates that although propagation and mortality rates both vary, their ratio is fixed. We develop a stochastic invasion approximation predicting that phenotypes with higher propagation rates will invade an empty environment (no biotic resistance) faster, despite their higher mortality rate. However, once population density approaches demographic equilibrium, phenotypes with lower mortality are favored, despite their lower propagation rate. We conducted a set of pairwise invasion analyses by simulating an individual-based model of preemptive competition. In each case, the phenotype with the lowest mortality rate and (via antagonistic pleiotropy) the lowest propagation rate qualified as evolutionarily stable among strategies simulated. This result, for a fixed propagation to mortality ratio, suggests that a selective response to spatial competition can extend the time scale of the population's dynamics, which in turn decelerates phenotypic evolution.
Fung, Monica; Kim, Jane; Marty, Francisco M; Schwarzinger, Michaël; Koo, Sophia
2015-01-01
Invasive fungal disease (IFD) causes significant morbidity and mortality in hematologic malignancy patients with high-risk febrile neutropenia (FN). These patients therefore often receive empirical antifungal therapy. Diagnostic test-guided pre-emptive antifungal therapy has been evaluated as an alternative treatment strategy in these patients. We conducted an electronic search for literature comparing empirical versus pre-emptive antifungal strategies in FN among adult hematologic malignancy patients. We systematically reviewed 9 studies, including randomized-controlled trials, cohort studies, and feasibility studies. Random and fixed-effect models were used to generate pooled relative risk estimates of IFD detection, IFD-related mortality, overall mortality, and rates and duration of antifungal therapy. Heterogeneity was measured via Cochran's Q test, I2 statistic, and between study τ2. Incorporating these parameters and direct costs of drugs and diagnostic testing, we constructed a comparative costing model for the two strategies. We conducted probabilistic sensitivity analysis on pooled estimates and one-way sensitivity analyses on other key parameters with uncertain estimates. Nine published studies met inclusion criteria. Compared to empirical antifungal therapy, pre-emptive strategies were associated with significantly lower antifungal exposure (RR 0.48, 95% CI 0.27-0.85) and duration without an increase in IFD-related mortality (RR 0.82, 95% CI 0.36-1.87) or overall mortality (RR 0.95, 95% CI 0.46-1.99). The pre-emptive strategy cost $324 less (95% credible interval -$291.88 to $418.65 pre-emptive compared to empirical) than the empirical approach per FN episode. However, the cost difference was influenced by relatively small changes in costs of antifungal therapy and diagnostic testing. Compared to empirical antifungal therapy, pre-emptive antifungal therapy in patients with high-risk FN may decrease antifungal use without increasing mortality. We demonstrate a state of economic equipoise between empirical and diagnostic-directed pre-emptive antifungal treatment strategies, influenced by small changes in cost of antifungal therapy and diagnostic testing, in the current literature. This work emphasizes the need for optimization of existing fungal diagnostic strategies, development of more efficient diagnostic strategies, and less toxic and more cost-effective antifungals.
Job shop scheduling problem with late work criterion
NASA Astrophysics Data System (ADS)
Piroozfard, Hamed; Wong, Kuan Yew
2015-05-01
Scheduling is considered as a key task in many industries, such as project based scheduling, crew scheduling, flight scheduling, machine scheduling, etc. In the machine scheduling area, the job shop scheduling problems are considered to be important and highly complex, in which they are characterized as NP-hard. The job shop scheduling problems with late work criterion and non-preemptive jobs are addressed in this paper. Late work criterion is a fairly new objective function. It is a qualitative measure and concerns with late parts of the jobs, unlike classical objective functions that are quantitative measures. In this work, simulated annealing was presented to solve the scheduling problem. In addition, operation based representation was used to encode the solution, and a neighbourhood search structure was employed to search for the new solutions. The case studies are Lawrence instances that were taken from the Operations Research Library. Computational results of this probabilistic meta-heuristic algorithm were compared with a conventional genetic algorithm, and a conclusion was made based on the algorithm and problem.
Foster, T A; Hackenberg, T D; Vaidya, M
2001-09-01
Pigeons' key pecks produced food under second-order schedules of token reinforcement, with light-emitting diodes serving as token reinforcers. In Experiment 1, tokens were earned according to a fixed-ratio 50 schedule and were exchanged for food according to either fixed-ratio or variable-ratio exchange schedules, with schedule type varied across conditions. In Experiment 2, schedule type was varied within sessions using a multiple schedule. In one component, tokens were earned according to a fixed-ratio 50 schedule and exchanged according to a variable-ratio schedule. In the other component, tokens were earned according to a variable-ratio 50 schedule and exchanged according to a fixed-ratio schedule. In both experiments, the number of responses per exchange was varied parametrically across conditions, ranging from 50 to 400 responses. Response rates decreased systematically with increases in the fixed-ratio exchange schedules, but were much less affected by changes in the variable-ratio exchange schedules. Response rates were consistently higher under variable-ratio exchange schedules than tinder comparable fixed-ratio exchange schedules, especially at higher exchange ratios. These response-rate differences were due both to greater pre-ratio pausing and to lower local rates tinder the fixed-ratio exchange schedules. Local response rates increased with proximity to food under the higher fixed-ratio exchange schedules, indicative of discriminative control by the tokens.
THE EFFECTS OF FIXED VERSUS ESCALATING REINFORCEMENT SCHEDULES ON SMOKING ABSTINENCE
Romanowich, Paul; Lamb, R. J.
2015-01-01
Studies indicate that when abstinence is initiated, escalating reinforcement schedules maintain continuous abstinence longer than fixed reinforcement schedules. However, these studies were conducted for shorter durations than most clinical trials and also resulted in larger reinforcer value for escalating participants during the 1st week of the experiment. We tested whether escalating reinforcement schedules maintained abstinence longer than fixed reinforcement schedules in a 12-week clinical trial. Smokers (146) were randomized to an escalating reinforcement schedule, a fixed reinforcement schedule, or a control condition. Escalating reinforcement participants received $5.00 for their first breath carbon monoxide (CO) sample <3 ppm, with a $0.50 increase for each consecutive sample. Fixed reinforcement participants received $19.75 for each breath CO sample <3 ppm. Control participants received payments only for delivering a breath CO sample. Similar proportions of escalating and fixed reinforcement participants met the breath CO criterion at least once. Escalating reinforcement participants maintained criterion breath CO levels longer than fixed reinforcement and control participants. Similar to previous short-term studies, escalating reinforcement schedules maintained longer durations of abstinence than fixed reinforcement schedules during a clinical trial. PMID:25640764
Hackenberg, T D; Hineline, P N
1992-01-01
Pigeons chose between two schedules of food presentation, a fixed-interval schedule and a progressive-interval schedule that began at 0 s and increased by 20 s with each food delivery provided by that schedule. Choosing one schedule disabled the alternate schedule and stimuli until the requirements of the chosen schedule were satisfied, at which point both schedules were again made available. Fixed-interval duration remained constant within individual sessions but varied across conditions. Under reset conditions, completing the fixed-interval schedule not only produced food but also reset the progressive interval to its minimum. Blocks of sessions under the reset procedure were interspersed with sessions under a no-reset procedure, in which the progressive schedule value increased independent of fixed-interval choices. Median points of switching from the progressive to the fixed schedule varied systematically with fixed-interval value, and were consistently lower during reset than during no-reset conditions. Under the latter, each subject's choices of the progressive-interval schedule persisted beyond the point at which its requirements equaled those of the fixed-interval schedule at all but the highest fixed-interval value. Under the reset procedure, switching occurred at or prior to that equality point. These results qualitatively confirm molar analyses of schedule preference and some versions of optimality theory, but they are more adequately characterized by a model of schedule preference based on the cumulated values of multiple reinforcers, weighted in inverse proportion to the delay between the choice and each successive reinforcer. PMID:1548449
Human's choices in situations of time-based diminishing returns.
Hackenberg, T D; Axtell, S A
1993-01-01
Three experiments examined adult humans' choices in situations with contrasting short-term and long-term consequences. Subjects were given repeated choices between two time-based schedules of points exchangeable for money: a fixed schedule and a progressive schedule that began at 0 s and increased by 5 s with each point delivered by that schedule. Under "reset" conditions, choosing the fixed schedule not only produced a point but it also reset the requirements of the progressive schedule to 0 s. In the first two experiments, reset conditions alternated with "no-reset" conditions, in which progressive-schedule requirements were independent of fixed-schedule choices. Experiment 1 entailed choices between a progressive-interval schedule and a fixed-interval schedule, the duration of which varied across conditions. Switching from the progressive- to the fixed-interval schedule was systematically related to fixed-interval size in 4 of 8 subjects, and in all subjects occurred consistently sooner in the progressive-schedule sequence under reset than under no-reset procedures. The latter result was replicated in a second experiment, in which choices between progressive- and fixed-interval schedules were compared with choices between progressive- and fixed-time schedules. In Experiment 3, switching patterns under reset conditions were unrelated to variations in intertrial interval. In none of the experiments did orderly choice patterns depend on verbal descriptions of the contingencies or on schedule-controlled response patterns in the presence of the chosen schedules. The overall pattern of results indicates control of choices by temporarily remote consequences, and is consistent with versions of optimality theory that address performance in situations of diminishing returns. PMID:8315364
Non-Preemptive Time Warp Scheduling Algorithms
1990-06-01
conducted in the Applied Technology Program of the Arroyo Center. Questions involving technical issues should be addressed to Dr. ,Jed Marti. Project...emphasizing mid- to long- terin problents. Its research is carried out in five programs : Policy and Strategy Studies: Force Development and Employment...various system parameters to reduce the global program execution time. Because we wanted to scale the system up, we did not allow interprocessor
A Comparison of Escalating versus Fixed Reinforcement Schedules on Undergraduate Quiz Taking
ERIC Educational Resources Information Center
Mahoney, Amanda
2017-01-01
Drug abstinence studies indicate that escalating reinforcement schedules maintain abstinence for longer periods than fixed reinforcement schedules. The current study evaluated whether escalating reinforcement schedules would maintain more quiz taking than fixed reinforcement schedules. During baseline and for the control group, bonus points were…
Kullberg, Anna; Bergenmar, Mia; Sharp, Lena
2016-05-01
To evaluate fixed scheduling compared with self-scheduling for nursing staff in oncological inpatient care with regard to patient and staff outcomes. Various scheduling models have been tested to attract and retain nursing staff. Little is known about how these schedules affect staff and patients. Fixed scheduling and self-scheduling have been studied to a small extent, solely from a staff perspective. We implemented fixed scheduling on two of four oncological inpatient wards. Two wards kept self-scheduling. Through a quasi-experimental design, baseline and follow-up measurements were collected among staff and patients. The Safety Attitudes Questionnaire was used among staff, as well as study-specific questions for patients and staff. Fixed scheduling was associated with less overtime and fewer possibilities to change shifts. Self-scheduling was associated with more requests from management for short notice shift changes. The type of scheduling did not affect patient-reported outcomes. Fixed scheduling should be considered in order to lower overtime. Further research is necessary and should explore patient outcomes to a greater extent. Scheduling is a core task for nurse managers. Our study suggests fixed scheduling as a strategy for managers to improve the effective use of resources and safety. © 2016 John Wiley & Sons Ltd.
How do employees prioritise when they schedule their own shifts?
Nabe-Nielsen, Kirsten; Lund, Henrik; Ajslev, Jeppe Z; Hansen, Åse Marie; Albertsen, Karen; Hvid, Helge; Garde, Anne Helene
2013-01-01
We investigated how employees prioritised when they scheduled their own shifts and whether priorities depended on age, gender, educational level, cohabitation and health status. We used cross-sectional questionnaire data from the follow-up survey of an intervention study investigating the effect of self-scheduling (n = 317). Intervention group participants were asked about their priorities when scheduling their own shifts succeeded by 17 items covering family/private life, economy, job content, health and sleep. At least half of the participants reported that they were giving high priority to their family life, having consecutive time off, leisure-time activities, rest between shifts, sleep, regularity of their everyday life, health and that the work schedule balanced. Thus, employees consider both their own and the workplace's needs when they have the opportunity to schedule their own shifts. Age, gender, cohabitation and health status were all significantly associated with at least one of these priorities. Intervention studies report limited health effects of self-scheduling. Therefore, we investigated to what extent employees prioritise their health and recuperation when scheduling their own shifts. We found that employees not only consider both their health and family but also the workplace's needs when they schedule their own shifts.
After the First Shots: Managing Escalation in Northeast Asia
2015-01-01
office and several days after North Korea’s third nuclear test, President Park Geun- hye pledged that “Missile capabil- ity will be expanded to develop...a ‘Kill Chain’ system to preemptively strike North Korean missile launchers and nuclear facilities.” See Sangwon Yoon, “ Park Lists Top Priorities...Selects the Taurus KEPD 350 Cruise Missile,” Defense Update, April 5, 2013; and Kim Eun-jung, “State Arms Procurer Requests 11 [Trillion] Won Budget for
15 CFR 700.14 - Preferential scheduling.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...
Relevance of infiltration analgesia in pain relief after total knee arthroplasty
Znojek-Tymborowska, Justyna; Kęska, Rafał; Paradowski, Przemysław T.; Witoński, Dariusz
2013-01-01
OBJECTIVE: The aim of the study was to assess the effect of different types of anesthesia on pain intensity in early postoperative period. PATIENTS AND METHODS: A total of 87 patients (77 women, 10 men) scheduled for total knee arthroplasty (TKA) were assigned to receive either subarachnoid anesthesia alone or in combination with local soft tissue anesthesia, local soft tissue anesthesia and femoral nerve block and pre-emptive infiltration together with local soft tissue anesthesia. We assessed the pain intensity, opioid consumption, knee joint mobility, and complications of surgery. RESULTS: Subjects with pre-emptive infiltration and local soft tissue anesthesia had lower pain intensity on the first postoperative day compared to those with soft tissue anesthesia and femoral nerve block (P=0.012, effect size 0.68). Subjects who received pre-emptive infiltration and local soft-tissue anesthesia had the greatest range of motion in the operated knee at discharge (mean 90 grades [SD 7], P=0.01 compared to those who received subarachnoid anesthesia alone, and P=0.001 compared to those with subarachnoid together with soft tissue anesthesia). CONCLUSION: Despite the differences in postoperative pain and knee mobility, the results obtained throughout the postoperative period do not enable us to favour neither local nor regional infiltration anesthesia in TKA. Level of Evidence II, Prospective Comparative Study. PMID:24453679
Satellite-instrument system engineering best practices and lessons
NASA Astrophysics Data System (ADS)
Schueler, Carl F.
2009-08-01
This paper focuses on system engineering development issues driving satellite remote sensing instrumentation cost and schedule. A key best practice is early assessment of mission and instrumentation requirements priorities driving performance trades among major instrumentation measurements: Radiometry, spatial field of view and image quality, and spectral performance. Key lessons include attention to technology availability and applicability to prioritized requirements, care in applying heritage, approaching fixed-price and cost-plus contracts with appropriate attention to risk, and assessing design options with attention to customer preference as well as design performance, and development cost and schedule. A key element of success either in contract competition or execution is team experience. Perhaps the most crucial aspect of success, however, is thorough requirements analysis and flowdown to specifications driving design performance with sufficient parameter margin to allow for mistakes or oversights - the province of system engineering from design inception to development, test and delivery.
Shlaifer, Amir; Sharfman, Zachary Tuvya; Martin, Hal David; Amar, Eyal; Kazum, Efi; Warschawski, Yaniv; Paret, Matan; Brill, Silviu; Drexler, Michael; Rath, Ehud
2017-01-01
To evaluate and compare the efficacy of intra-articular and periacetabular blocks for postoperative pain control after hip arthroscopy. Forty-two consecutive patients scheduled for hip arthroscopy were randomized into 2 postoperative pain control groups. One group received preemptive intra-articular 20 mL of bupivacaine 0.5% injection, and the second group received preemptive periacetabular 20 mL of bupivacaine 0.5% injection. Before closure all patients received an additional dose of 20 mL of bupivacaine 0.5% intra-articularly. Data were compared with respect to postoperative pain with visual analog scale (VAS) and analgesic consumption, documented in a pain diary for 2 weeks after surgery. Twenty-one patients were treated with intra-articular injection, and 21 patients with peri-acetabular injection. There were no significant differences with regards to patient demographics or surgical procedures. VAS scores recorded during the first 30 minutes postoperatively and 18 hours after surgery were significantly lower in the periacetabular group compared with in the intra-articular group (0.667 ± 1.49 vs 2.11 ± 2.29; P < .045 and 2.62 ± 2.2 vs 4.79 ± 2.6; P < .009). There were no differences between the groups with regard to analgesic consumption. Periacetabular injection of bupivacaine 0.5% was superior to intra-articular injection in pain reduction after hip arthroscopy at 30 minutes and 18 hours postoperatively. However, total analgesic consumption over the first 2 postoperative weeks and VAS pain measurements were not significantly affected. Level I, randomized controlled trial. Copyright © 2016 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.
Preemptive analgesia in rhegmatogenous retinal detachment surgery: is it effective?
Mahfouz, Abdul Kader M; Nabawi, Khaled S
2002-10-01
To evaluate the efficacy of preemptive analgesia in surgical repair of retinal detachment (RD) using scleral buckle and cryopexy under general anesthesia. Thirty patients who were scheduled for rhegmatogenous RD surgical repair using scleral buckle and cryopexy and who were American Society of Anesthesiologists physical status I, II, or III were included in this study. The patients were randomly divided into two equal groups. The surgery was done under general anesthesia in both groups, but in Group 2, sub-Tenon anesthesia was given as preemptive analgesia after induction anesthesia and before start of surgery. Both groups were statistically comparable as regards patient age and weight and duration of anesthesia and surgery. The incidences of intraoperative oculocardiac reflex and postoperative vomiting were significantly lower in Group 2 compared with Group 1 (P < 0.001 and 0.0113, respectively). The time of first postoperative analgesic dose was significantly shorter in Group 1 (46.67 +/- 18.84 minutes) compared with Group 2 (162.67 +/- 29.391 minutes) (P < 0.001). The total analgesic consumption per 24 hours was significantly higher in Group 1 compared with Group 2 (P < 0.001). The time of discharge from the hospital was significantly shorter in Group 2 (8.8 +/- 2.704 hours) compared with Group 1 (12.4 +/- 3.481 hours) (P = 0.0018). The use of sub-Tenon block as preemptive analgesia after induction of general anesthesia and before the start of rhegmatogenous RD surgical repair was effective in reducing postoperative pain and analgesic requirements compared with an unblocked group. The use of sub-Tenon block was also effective in reducing intraoperative incidence of oculocardiac reflex and postoperative incidence of vomiting.
A Scheduling Algorithm for Cloud Computing System Based on the Driver of Dynamic Essential Path.
Xie, Zhiqiang; Shao, Xia; Xin, Yu
2016-01-01
To solve the problem of task scheduling in the cloud computing system, this paper proposes a scheduling algorithm for cloud computing based on the driver of dynamic essential path (DDEP). This algorithm applies a predecessor-task layer priority strategy to solve the problem of constraint relations among task nodes. The strategy assigns different priority values to every task node based on the scheduling order of task node as affected by the constraint relations among task nodes, and the task node list is generated by the different priority value. To address the scheduling order problem in which task nodes have the same priority value, the dynamic essential long path strategy is proposed. This strategy computes the dynamic essential path of the pre-scheduling task nodes based on the actual computation cost and communication cost of task node in the scheduling process. The task node that has the longest dynamic essential path is scheduled first as the completion time of task graph is indirectly influenced by the finishing time of task nodes in the longest dynamic essential path. Finally, we demonstrate the proposed algorithm via simulation experiments using Matlab tools. The experimental results indicate that the proposed algorithm can effectively reduce the task Makespan in most cases and meet a high quality performance objective.
A Scheduling Algorithm for Cloud Computing System Based on the Driver of Dynamic Essential Path
Xie, Zhiqiang; Shao, Xia; Xin, Yu
2016-01-01
To solve the problem of task scheduling in the cloud computing system, this paper proposes a scheduling algorithm for cloud computing based on the driver of dynamic essential path (DDEP). This algorithm applies a predecessor-task layer priority strategy to solve the problem of constraint relations among task nodes. The strategy assigns different priority values to every task node based on the scheduling order of task node as affected by the constraint relations among task nodes, and the task node list is generated by the different priority value. To address the scheduling order problem in which task nodes have the same priority value, the dynamic essential long path strategy is proposed. This strategy computes the dynamic essential path of the pre-scheduling task nodes based on the actual computation cost and communication cost of task node in the scheduling process. The task node that has the longest dynamic essential path is scheduled first as the completion time of task graph is indirectly influenced by the finishing time of task nodes in the longest dynamic essential path. Finally, we demonstrate the proposed algorithm via simulation experiments using Matlab tools. The experimental results indicate that the proposed algorithm can effectively reduce the task Makespan in most cases and meet a high quality performance objective. PMID:27490901
NASA Astrophysics Data System (ADS)
Kiran Kumar, Kalla; Nagaraju, Dega; Gayathri, S.; Narayanan, S.
2017-05-01
Priority Sequencing Rules provide the guidance for the order in which the jobs are to be processed at a workstation. The application of different priority rules in job shop scheduling gives different order of scheduling. More experimentation needs to be conducted before a final choice is made to know the best priority sequencing rule. Hence, a comprehensive method of selecting the right choice is essential in managerial decision making perspective. This paper considers seven different priority sequencing rules in job shop scheduling. For evaluation and selection of the best priority sequencing rule, a set of eight criteria are considered. The aim of this work is to demonstrate the methodology of evaluating and selecting the best priority sequencing rule by using hybrid multi criteria decision making technique (MCDM), i.e., analytical hierarchy process (AHP) with technique for order preference by similarity to ideal solution (TOPSIS). The criteria weights are calculated by using AHP whereas the relative closeness values of all priority sequencing rules are computed based on TOPSIS with the help of data acquired from the shop floor of a manufacturing firm. Finally, from the findings of this work, the priority sequencing rules are ranked from most important to least important. The comprehensive methodology presented in this paper is very much essential for the management of a workstation to choose the best priority sequencing rule among the available alternatives for processing the jobs with maximum benefit.
Proportional fair scheduling algorithm based on traffic in satellite communication system
NASA Astrophysics Data System (ADS)
Pan, Cheng-Sheng; Sui, Shi-Long; Liu, Chun-ling; Shi, Yu-Xin
2018-02-01
In the satellite communication network system, in order to solve the problem of low system capacity and user fairness in multi-user access to satellite communication network in the downlink, combined with the characteristics of user data service, an algorithm study on throughput capacity and user fairness scheduling is proposed - Proportional Fairness Algorithm Based on Traffic(B-PF). The algorithm is improved on the basis of the proportional fairness algorithm in the wireless communication system, taking into account the user channel condition and caching traffic information. The user outgoing traffic is considered as the adjustment factor of the scheduling priority and presents the concept of traffic satisfaction. Firstly,the algorithm calculates the priority of the user according to the scheduling algorithm and dispatches the users with the highest priority. Secondly, when a scheduled user is the business satisfied user, the system dispatches the next priority user. The simulation results show that compared with the PF algorithm, B-PF can improve the system throughput, the business satisfaction and fairness.
Xiang, Wei; Li, Chong
2015-01-01
Operating Room (OR) is the core sector in hospital expenditure, the operation management of which involves a complete three-stage surgery flow, multiple resources, prioritization of the various surgeries, and several real-life OR constraints. As such reasonable surgery scheduling is crucial to OR management. To optimize OR management and reduce operation cost, a short-term surgery scheduling problem is proposed and defined based on the survey of the OR operation in a typical hospital in China. The comprehensive operation cost is clearly defined considering both under-utilization and overutilization. A nested Ant Colony Optimization (nested-ACO) incorporated with several real-life OR constraints is proposed to solve such a combinatorial optimization problem. The 10-day manual surgery schedules from a hospital in China are compared with the optimized schedules solved by the nested-ACO. Comparison results show the advantage using the nested-ACO in several measurements: OR-related time, nurse-related time, variation in resources' working time, and the end time. The nested-ACO considering real-life operation constraints such as the difference between first and following case, surgeries priority, and fixed nurses in pre/post-operative stage is proposed to solve the surgery scheduling optimization problem. The results clearly show the benefit of using the nested-ACO in enhancing the OR management efficiency and minimizing the comprehensive overall operation cost.
Operating room scheduling using hybrid clustering priority rule and genetic algorithm
NASA Astrophysics Data System (ADS)
Santoso, Linda Wahyuni; Sinawan, Aisyah Ashrinawati; Wijaya, Andi Rahadiyan; Sudiarso, Andi; Masruroh, Nur Aini; Herliansyah, Muhammad Kusumawan
2017-11-01
Operating room is a bottleneck resource in most hospitals so that operating room scheduling system will influence the whole performance of the hospitals. This research develops a mathematical model of operating room scheduling for elective patients which considers patient priority with limit number of surgeons, operating rooms, and nurse team. Clustering analysis was conducted to the data of surgery durations using hierarchical and non-hierarchical methods. The priority rule of each resulting cluster was determined using Shortest Processing Time method. Genetic Algorithm was used to generate daily operating room schedule which resulted in the lowest values of patient waiting time and nurse overtime. The computational results show that this proposed model reduced patient waiting time by approximately 32.22% and nurse overtime by approximately 32.74% when compared to actual schedule.
Conflict-Aware Scheduling Algorithm
NASA Technical Reports Server (NTRS)
Wang, Yeou-Fang; Borden, Chester
2006-01-01
conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.
NASA Astrophysics Data System (ADS)
Youn, Joo-Sang; Seok, Seung-Joon; Kang, Chul-Hee
This paper presents a new QoS model for end-to-end service provisioning in multi-hop wireless networks. In legacy IEEE 802.11e based multi-hop wireless networks, the fixed assignment of service classes according to flow's priority at every node causes priority inversion problem when performing end-to-end service differentiation. Thus, this paper proposes a new QoS provisioning model called Dynamic Hop Service Differentiation (DHSD) to alleviate the problem and support effective service differentiation between end-to-end nodes. Many previous works for QoS model through the 802.11e based service differentiation focus on packet scheduling on several service queues with different service rate and service priority. Our model, however, concentrates on a dynamic class selection scheme, called Per Hop Class Assignment (PHCA), in the node's MAC layer, which selects a proper service class for each packet, in accordance with queue states and service requirement, in every node along the end-to-end route of the packet. The proposed QoS solution is evaluated using the OPNET simulator. The simulation results show that the proposed model outperforms both best-effort and 802.11e based strict priority service models in mobile ad hoc environments.
Wordliczek, Jerzy; Banach, Marcin; Garlicki, Jarosław; Jakowicka-Wordliczek, Joanna; Dobrogowski, Jan
2002-01-01
The aim of this study was to assess the influence of iv tramadol on opioid requirement in the early postoperative period. The subjects were 90 patients scheduled for colon surgery (hemicolectomy) who received general anesthesia using the (N2O/O2) isoflurane technique. Thirty patients (group I) were administered 100 mg of tramadol iv before induction of general anesthesia (preemptive analgesia). Group II (30 patients) was administered 100 mg of tramadol iv immediately after peritoneal closure (preventive analgesia) and control group (30 patients) received 100 mg of tramadol iv immediately after operation. Following the operation, all patients were administered tramadol in the PCA-iv mode in order to treat postoperative pain. In the postoperative period, the following parameters were measured: pain intensity (using VAS), total consumption of tramadol, time until the first PCA activation, and frequency of side effects (drowsiness, nausea, vomiting). In patients of groups I and II who had received preemptive or preventive analgesia, a significantly lower total consumption of tramadol, as compared with control group, was observed in the early postoperative period. However, the time until the first PCA activation was significantly shorter in group I as compared to the other two groups. No significant differences between the groups were found regarding pain intensity and frequency of side effects.
Pain management for joint arthroplasty: preemptive analgesia.
Mallory, Thomas H; Lombardi, Adolph V; Fada, Robert A; Dodds, Kathleen L; Adams, Joanne B
2002-06-01
Scheduled preoperative and postoperative analgesia should be offered in a multimodal management model. By a combined drug synergy effect, the central nervous system, afferent pathways, and peripheral wound site are modified collectively. In an ongoing effort to improve perioperative pain management, we retrospectively compared the results of a previously reported pain management protocol with 2 more recent groups of patients managed with modified pain protocols. In the earlier control protocol, epidural anesthesia was discontinued on arrival to the postanesthesia care unit, and regularly scheduled oral opioids and intravenous hydromorphone for breakthrough pain were initiated. The first more recent group used epidural anesthesia, and the second group used spinal anesthesia. Both protocols featured the use of cyclooxygenase-2-inhibiting anti-inflammatory medication administered for 2 weeks preoperatively and continued for 10 days postoperatively and patient-controlled analgesia for 24 hours followed by scheduled oral opioids. Copyright 2002, Elsevier Science (USA).
Influences on Cocaine Tolerance Assessed under a Multiple Conjunctive Schedule of Reinforcement
ERIC Educational Resources Information Center
Yoon, Jin Ho; Branch, Marc N.
2009-01-01
Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the…
NASA Technical Reports Server (NTRS)
Chevalley, Eric; Parke, Bonny; Kraut, Josh M.; Bienert, Nancy; Omar, Faisal; Palmer, Everett A.
2015-01-01
In this paper, successful Time-Based Flow Management (TBFM) scheduling systems for arrivals are considered and adapted to apply to departures. We present a concept of operations that integrates Controller-Managed Spacing tools for departures (CMS-D) with existing tactical departure scheduling tools to coordinate demand at departure fixes in a metroplex environment. We tested our concept in a Human-in-the-Loop simulation and compared the effect of two scheduling conditions: 1) "Departure Scheduling" consisting of an emulation of the Integrated Departure and Arrival Capability (IDAC) where Towers and a Planner (Traffic Management Coordinator at the appropriate facility) coordinate aircraft scheduled takeoff times to departure fixes; and 2) "Arrival Sensitive Departure Scheduling" where, in addition, the Tower and Planner also consider arrival Scheduled Time of Arrivals (STAs) at the airport's dependent runway. Results indicate little difference between the two scheduling conditions, but a large difference between the No Tools and the two scheduling conditions with CMS-D tools. The scheduling/CMS-D tools conditions markedly reduced heading, speed clearances, and workload for controllers who were merging flows at the departure fixes. In the tool conditions, departure controllers conditioned departures earlier rather than later when aircraft were tied near the departure fixes. In the scheduling/CMS-D tools conditions, departures crossed the departure fixes 50 seconds earlier and with an 8% error rate (consisting of time ahead or behind desired time of arrival) compared to a 19% error rate in the No Tool condition. Two exploratory runs showed that similar beneficial effects can be obtained only with the CMS-D tools without scheduling takeoff times, but at the cost of a somewhat higher workload for controllers, indicating the benefits of pre-departure scheduling of aircraft with minimal delays. Hence, we found that CMS-D tools were very beneficial in the metroplex environment we tested but that further research is needed to clarify the benefits of the various scheduling approaches.
Fixed-Time Schedule Effects in Combination with Response-Dependent Schedules
ERIC Educational Resources Information Center
Borrero, John C.; Bartels-Meints, Jamie A.; Sy, Jolene R.; Francisco, Monica T.
2011-01-01
We evaluated the effects of fixed-interval (FI), fixed-time (FT), and conjoint (combined) FI FT reinforcement schedules on the responding of 3 adults who had been diagnosed with schizophrenia. Responding on vocational tasks decreased for 2 of 3 participants under FT alone relative to FI alone. Responding under FI FT resulted in response…
Barrett, J E
1983-04-01
Lever pressing by squirrel monkeys and key pecking by pigeons were maintained under a multiple 3-min fixed-interval (FI), 30-response fixed-ratio (FR) schedule by the presentation of food. These responses, which differed under the two schedules, but were similar for both species, were used to compare the effects of antipsychotic compounds from different pharmacological classes. Except for differences in potency levels, the effects of intermediate doses of haloperidol and molindone were similar in monkeys and pigeons; these compounds decreased responding under the fixed-interval schedule at doses that did not affect fixed-ratio responding. Similar effects also occurred with chlorpromazine, promazine and thiothixene in pigeons. With monkeys, however, intermediate doses of promazine decreased fixed-ratio responding more than responding maintained under the fixed-interval schedule, while chlorpromazine and thiothixene produced similar effects on responding under both schedules. The effects of novel antipsychotic, clozapine, differed from those of the other agents in both monkeys and pigeons. With both species clozapine increased fixed interval responding at doses that did not affect responding under the fixed-ratio schedule. Doses required to reduce responding at least 50% were approximately 5 to 160 times greater for pigeons than for monkeys for all drugs except clozapine which was equipotent in both species. In monkeys the order of potency was haloperidol greater than molindone = thiothixene greater than chlorpromazine greater than clozapine greater than promazine, whereas in pigeons the order was haloperidol greater than thiothixene greater than clozapine greater than molindone greater than promazine greater than chlorpromazine.
NASA Astrophysics Data System (ADS)
Coffey, Stephen; Connell, Joseph
2005-06-01
This paper presents a development platform for real-time image processing based on the ADSP-BF533 Blackfin processor and the MicroC/OS-II real-time operating system (RTOS). MicroC/OS-II is a completely portable, ROMable, pre-emptive, real-time kernel. The Blackfin Digital Signal Processors (DSPs), incorporating the Analog Devices/Intel Micro Signal Architecture (MSA), are a broad family of 16-bit fixed-point products with a dual Multiply Accumulate (MAC) core. In addition, they have a rich instruction set with variable instruction length and both DSP and MCU functionality thus making them ideal for media based applications. Using the MicroC/OS-II for task scheduling and management, the proposed system can capture and process raw RGB data from any standard 8-bit greyscale image sensor in soft real-time and then display the processed result using a simple PC graphical user interface (GUI). Additionally, the GUI allows configuration of the image capture rate and the system and core DSP clock rates thereby allowing connectivity to a selection of image sensors and memory devices. The GUI also allows selection from a set of image processing algorithms based in the embedded operating system.
A bi-objective integer programming model for partly-restricted flight departure scheduling
Guan, Wei; Zhang, Wenyi; Jiang, Shixiong; Fan, Lingling
2018-01-01
The normal studies on air traffic departure scheduling problem (DSP) mainly deal with an independent airport in which the departure traffic is not affected by surrounded airports, which, however, is not a consistent case. In reality, there still exist cases where several commercial airports are closely located and one of them possesses a higher priority. During the peak hours, the departure activities of the lower-priority airports are usually required to give way to those of higher-priority airport. These giving-way requirements can inflict a set of changes on the modeling of departure scheduling problem with respect to the lower-priority airports. To the best of our knowledge, studies on DSP under this condition are scarce. Accordingly, this paper develops a bi-objective integer programming model to address the flight departure scheduling of the partly-restricted (e.g., lower-priority) one among several adjacent airports. An adapted tabu search algorithm is designed to solve the current problem. It is demonstrated from the case study of Tianjin Binhai International Airport in China that the proposed method can obviously improve the operation efficiency, while still realizing superior equity and regularity among restricted flows. PMID:29715299
A bi-objective integer programming model for partly-restricted flight departure scheduling.
Zhong, Han; Guan, Wei; Zhang, Wenyi; Jiang, Shixiong; Fan, Lingling
2018-01-01
The normal studies on air traffic departure scheduling problem (DSP) mainly deal with an independent airport in which the departure traffic is not affected by surrounded airports, which, however, is not a consistent case. In reality, there still exist cases where several commercial airports are closely located and one of them possesses a higher priority. During the peak hours, the departure activities of the lower-priority airports are usually required to give way to those of higher-priority airport. These giving-way requirements can inflict a set of changes on the modeling of departure scheduling problem with respect to the lower-priority airports. To the best of our knowledge, studies on DSP under this condition are scarce. Accordingly, this paper develops a bi-objective integer programming model to address the flight departure scheduling of the partly-restricted (e.g., lower-priority) one among several adjacent airports. An adapted tabu search algorithm is designed to solve the current problem. It is demonstrated from the case study of Tianjin Binhai International Airport in China that the proposed method can obviously improve the operation efficiency, while still realizing superior equity and regularity among restricted flows.
Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun
2016-02-01
As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.
Some Determinants of Remote Behavioral History Effects in Humans
ERIC Educational Resources Information Center
Hirai, Mariko; Okouchi, Hiroto; Matsumoto, Akio; Lattal, Kennon A.
2011-01-01
Undergraduates were exposed to a series of reinforcement schedules: first, to a fixed-ratio (FR) schedule in the presence of one stimulus and to a differential-reinforcement-of-low-rate (DRL) schedule in the presence of another (multiple FR DRL training), then to a fixed-interval (FI) schedule in the presence of a third stimulus (FI baseline),…
Cost-efficient scheduling of FAST observations
NASA Astrophysics Data System (ADS)
Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi
2018-03-01
A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.
Lopez, F; Pereira, C
1985-03-01
Two experiments used response-restriction procedures in order to test the independence of the factors determining response rate and the factors determining the size of the postreinforcement pause on interval schedules. Responding was restricted by response-produced blackout or by retracting the lever. In Experiment 1 with a Conjunctive FR 1 FT schedule, the blackout procedure reduced the postreinforcement pause more than the lever-retraction procedure did, and both procedures produced shorter pauses than did the schedule without response restriction. In Experiment 2 the interreinforcement interval was also manipulated, and the size of the pause was an increasing function of the interreinforcement interval, but the rate of increase was lower than that produced by fixed interval schedules of comparable interval durations. The assumption of functional independence of the postreinforcement pause and terminal rate in fixed interval schedules is questioned since data suggest that pause reductions resulted from constraining variation in response number compared to equivalent periodic schedules in which response number was allowed to vary. Copyright © 1985. Published by Elsevier B.V.
The AMSC mobile satellite system
NASA Technical Reports Server (NTRS)
Agnew, Carson E.; Bhagat, Jai; Hopper, Edwin A.; Kiesling, John D.; Exner, Michael L.; Melillo, Lawrence; Noreen, Gary K.; Parrott, Billy J.
1988-01-01
The American Mobile Satellite Consortium (AMSC) Mobile Satellite Service (MSS) system is described. AMSC will use three multi-beam satellites to provide L-band MSS coverage to the United States, Canada and Mexico. The AMSC MSS system will have several noteworthy features, including a priority assignment processor that will ensure preemptive access to emergency services, a flexible SCPC channel scheme that will support a wide diversity of services, enlarged system capacity through frequency and orbit reuse, and high effective satellite transmitted power. Each AMSC satellite will make use of 14 MHz (bi-directional) of L-band spectrum. The Ku-band will be used for feeder links.
An Efficient Randomized Algorithm for Real-Time Process Scheduling in PicOS Operating System
NASA Astrophysics Data System (ADS)
Helmy*, Tarek; Fatai, Anifowose; Sallam, El-Sayed
PicOS is an event-driven operating environment designed for use with embedded networked sensors. More specifically, it is designed to support the concurrency in intensive operations required by networked sensors with minimal hardware requirements. Existing process scheduling algorithms of PicOS; a commercial tiny, low-footprint, real-time operating system; have their associated drawbacks. An efficient, alternative algorithm, based on a randomized selection policy, has been proposed, demonstrated, confirmed for efficiency and fairness, on the average, and has been recommended for implementation in PicOS. Simulations were carried out and performance measures such as Average Waiting Time (AWT) and Average Turn-around Time (ATT) were used to assess the efficiency of the proposed randomized version over the existing ones. The results prove that Randomized algorithm is the best and most attractive for implementation in PicOS, since it is most fair and has the least AWT and ATT on average over the other non-preemptive scheduling algorithms implemented in this paper.
NASA Astrophysics Data System (ADS)
Magee, T. M.; Zagona, E. A.
2017-12-01
Practical operational optimization of multipurpose reservoir systems is challenging for several reasons. Each purpose has its own constraints which may conflict with those of other purposes. While hydropower generation typically provides the bulk of the revenue, it is also among the lowest priority purposes. Each river system has important details that are specific to the location such as hydrology, reservoir storage capacity, physical limitations, bottlenecks, and the continuing evolution of operational policy. In addition, reservoir operations models include discrete, nonlinear, and nonconvex physical processes and if-then operating policies. Typically, the forecast horizon for scheduling needs to be extended far into the future to avoid near term (e.g., a few hours or a day) scheduling decisions that result in undesirable future states; this makes the computational effort much larger than may be expected. Put together, these challenges lead to large and customized mathematical optimization problems which must be solved efficiently to be of practical use. In addition, the solution process must be robust in an operational setting. We discuss a unique modeling approach in RiverWare that meets these challenges in an operational setting. The approach combines a Preemptive Linear Goal Programming optimization model to handle prioritized policies complimented by preprocessing and postprocessing with Rulebased Simulation to improve the solution with regard to nonlinearities, discrete issues, and if-then logic. An interactive policy language with a graphical user interface allows modelers to customize both the optimization and simulation based on the unique aspects of the policy for their system while the routine physical aspect of operations are modeled automatically. The modeler is aided by a set of compiled predefined functions and functions shared by other modelers. We illustrate the success of the approach with examples from daily use at the Tennessee Valley Authority, the Bonneville Power Administration, and public utility districts on the Mid-Columbia River. We discuss recent innovations to improve solution quality, robustness, and performance for these systems. We conclude with new modeling challenges to extend the modeling approach to other uses.
Comparative Study of Job Burnout Among Critical Care Nurses With Fixed and Rotating Shift Schedules
Shamali, Mahdi; Shahriari, Mohsen; Babaii, Atye; Abbasinia, Mohammad
2015-01-01
Background: Nurses, as health care providers, are insurmountably obliged to the practice of shift work. Literature has reported shift working as one of the inducing factors of burnout. Despite numerous studies in this area, there are inconsistencies on the relationship between shift working and burnout among nurses, especially in those who work in critical care settings. Objectives: The aim of this study was to compare the occupational burnout in critical care nurses with and without fixed shift schedules. Patients and Methods: In this comparative study, 130 nurses with rotating shift schedule and 130 nurses with fixed shift schedule from six university hospitals were selected using stratified random sampling. Maslach burnout inventory was used for data collection. Independent samples t-test, chi-square and one-way ANOVA tests were used to analyze the data. Results: Most of the participants were females (62.7%), aged between 22 - 29 years (38.5%), married (59.2%), and had a bachelor degree (86.9%). The mean score of emotional exhaustion was significantly higher in nurses with fixed shift schedules (P < 0.001). However, no significant difference was found between the mean scores of the two groups in the personal accomplishment and depersonalization subscales (P > 0.05). Moreover, no significant difference was found in burnout mean scores between nurses with fixed morning and fixed night shifts (P > 0.05). The means of the emotional exhaustion subscale were significantly different in nurses with different characteristics (P < 0.05) except the gender and working unit. Conclusions: As a result of this study, it was found that critical care nurses with fixed shift schedules display more burnout in emotional exhaustion dimension, compared to those working with rotating shift schedules. PMID:26576442
Management Matters. Changing to Flexible Scheduling
ERIC Educational Resources Information Center
Pappas, Marjorie L.
2005-01-01
Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…
Mancio, Jennifer; Leal, Cátia; Ferreira, Marta; Norton, Pedro; Lunet, Nuno
2018-04-27
Recent studies suggested that the relation between night-shift work and prostate cancer may differ between rotating and fixed schedules. We aimed to quantify the independent association between night-shift work and prostate cancer, for rotating and fixed schedules. We searched MEDLINE for studies assessing the association of night-shift work, by rotating or fixed schedules, with prostate cancer. We computed summary relative risk (RR) estimates with 95% confidence intervals (95% CI) using the inverse variance method and quantified heterogeneity using the I 2 statistic. Meta-regression analysis was used to compare the summary RR estimates for rotating and fixed schedules, while reducing heterogeneity. A total of nine studies assessed the effect of rotating and, in addition, four of them provided the effect of fixed night-shift work, in relation to daytime workers. Rotating night-shift work was associated with a significantly increased risk of prostate cancer (RR = 1.06, 95% CI of 1.01 to 1.12; I 2 = 50%), but not fixed night-shift work (RR of 1.01, 95% CI of 0.81 to 1.26; I 2 = 33%). In meta-regression model including study design, type of population, and control of confounding, the summary RR was 20% higher for rotating vs. fixed schedule, with heterogeneity fully explained by these variables. This is the first meta-analysis suggesting that an increased risk of prostate cancer may be restricted to workers with rotating night shifts. However, the association was weak and additional studies are needed to further clarify this relation before it can be translated into measures for risk reduction in occupational settings.
Preemptive strikes: Fear, hope, and defensive aggression.
Halevy, Nir
2017-02-01
Preemptive strikes are costly and harmful. Existing models of defensive aggression focus narrowly on the role fear plays in motivating preemptive strikes. Theoretically integrating the literatures on conflict, decision making, and emotion, the current research investigated how specific emotions associated with certainty or uncertainty, including fear, anger, disgust, hope, and happiness, influence preemptive strikes. Study 1 demonstrated that hope negatively predicts defensive exits from relationships in choice dilemmas. Studies 2 and 3 experimentally manipulated risk of being attacked in an incentivized, interactive decision making task-the Preemptive Strike Game. Risk of being attacked fueled preemptive strikes; reduced feelings of hope partially mediated this effect in Study 3. Studies 4 and 5 investigated preemptive strikes under uncertainty (rather than risk). In Study 4, reasoning about the factors that make one trustful of others curbed preemptive strikes; cogitating about the factors that underlie discrete emotions, however, did not influence defensive aggression. Study 5 demonstrated that the valence and uncertainty appraisals of incidental emotions interact in shaping preemptive strikes. Specifically, recalling an autobiographical emotional experience that produced hope significantly decreased attack rates relative to fear, happiness, and a control condition. Fear, anger, disgust, and happiness were either unrelated to preemptive strikes or showed inconsistent relationships with preemptive strikes across the 5 studies. These findings shed light on how emotions shape defensive aggression, advance knowledge on strategic choice under risk and uncertainty, and demonstrate hope's positive effects on social interactions and relationships. (PsycINFO Database Record (c) 2017 APA, all rights reserved).
ERIC Educational Resources Information Center
Harris, Aimee; Foster, T. Mary; Levine, Joshua; Temple, William
2012-01-01
Domestic hens responded under multiple fixed-ratio fixed-ratio schedules with equal fixed ratios. One component provided immediate reinforcement and the other provided reinforcement after a delay, signaled by the offset of the key light. The components were presented quasi-randomly so that all four possible transitions occurred in each session.…
Capriotti, Matthew R; Turkel, Jennifer E; Johnson, Rachel A; Espil, Flint M; Woods, Douglas W
2017-01-01
Chronic tic disorders (CTDs) involve motor and/or vocal tics that often cause substantial distress and impairment. Differential reinforcement of other behavior (DRO) schedules of reinforcement produce robust, but incomplete, reductions in tic frequency in youth with CTDs; however, a more robust reduction may be needed to affect durable clinical change. Standard, fixed-amount DRO schedules have not commonly yielded such reductions, so we evaluated a novel, progressive-amount DRO schedule, based on its ability to facilitate sustained abstinence from functionally similar behaviors. Five youth with CTDs were exposed to periods of baseline, fixed-amount DRO (DRO-F), and progressive-amount DRO (DRO-P). Both DRO schedules produced decreases in tic rate and increases in intertic interval duration, but no systematic differences were seen between the two schedules on any dimension of tic occurrence. The DRO-F schedule was generally preferred to the DRO-P schedule. Possible procedural improvements and other future directions are discussed. © 2016 Society for the Experimental Analysis of Behavior.
Dedicated heterogeneous node scheduling including backfill scheduling
Wood, Robert R [Livermore, CA; Eckert, Philip D [Livermore, CA; Hommes, Gregg [Pleasanton, CA
2006-07-25
A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.
Priorities for CMV vaccine development
Krause, Philip R.; Bialek, Stephanie R.; Boppana, Suresh B.; Griffiths, Paul D.; Laughlin, Catherine A.; Ljungman, Per; Mocarski, Edward S.; Pass, Robert F.; Read, Jennifer S.; Schleiss, Mark R.; Plotkin, Stanley A.
2015-01-01
A multidisciplinary meeting addressed priorities related to development of vaccines against cytomegalovirus (CMV), the cause of congenital CMV (cCMV) disease and of serious disease in the immunocompromised. Participants discussed optimal uses of a CMV vaccine, aspects of clinical study design, and the value of additional research. A universal childhood CMV vaccine could potentially rapidly reduce cCMV disease, as infected children are sources of viral transmission to seronegative and seropositive mothers. A vaccine administered to adolescents or adult women could also reduce cCMV disease by making them immune prior to pregnancy. Clinical trials of CMV vaccines in women should evaluate protection against cCMV infection, an essential precursor of cCMV disease, which is a more practical and acceptable endpoint for assessing vaccine effects on maternal-fetal transmission. Clinical trials of vaccines to evaluate prevention of CMV disease in stem cell transplant recipients could use CMV viremia at a level triggering preemptive antiviral therapy as an endpoint, because widespread use of preemptive and prophylactic antivirals has rendered CMV-induced disease too rare to be a practical endpoint for clinical trials. In solid organ transplant patients, CMV-associated disease is sufficiently common for use as a primary endpoint. Additional research to advance CMV vaccine development should include identifying factors that predict fetal loss due to CMV, determining age-specific incidence and transmission rates, defining the mechanism and relative contributions of maternal reactivation and re-infection to cCMV disease, developing assays that can distinguish between reactivation and re-infection in seropositive vaccinees, further defining predictors of sequelae from cCMV infection, and identifying clinically relevant immune response parameters to CMV (including developing validated assays that could assess CMV antibody avidity) that could lead to the establishment of immune correlates of protection. PMID:24129123
Second-Order Schedules of Token Reinforcement with Pigeons: Implications for Unit Price
ERIC Educational Resources Information Center
Bullock, Christopher E.; Hackenberg, Timothy D.
2006-01-01
Four pigeons were exposed to second-order schedules of token reinforcement, with stimulus lights serving as token reinforcers. Tokens were earned according to a fixed-ratio (token-production) schedule, with the opportunity to exchange tokens for food (exchange period) occurring after a fixed number had been produced (exchange-production ratio).…
Choice between Single and Multiple Reinforcers in Concurrent-Chains Schedules
ERIC Educational Resources Information Center
Mazur, James E.
2006-01-01
Pigeons responded on concurrent-chains schedules with equal variable-interval schedules as initial links. One terminal link delivered a single reinforcer after a fixed delay, and the other terminal link delivered either three or five reinforcers, each preceded by a fixed delay. Some conditions included a postreinforcer delay after the single…
Pigeons' Choices between Fixed-Interval and Random-Interval Schedules: Utility of Variability?
ERIC Educational Resources Information Center
Andrzejewski, Matthew E.; Cardinal, Claudia D.; Field, Douglas P.; Flannery, Barbara A.; Johnson, Michael; Bailey, Kathleen; Hineline, Philip N.
2005-01-01
Pigeons' choosing between fixed-interval and random-interval schedules of reinforcement was investigated in three experiments using a discrete-trial procedure. In all three experiments, the random-interval schedule was generated by sampling a probability distribution at an interval (and in multiples of the interval) equal to that of the…
Fixed Schedules Can Support 21st-Century Skills
ERIC Educational Resources Information Center
Formanack, Gail; Pietsch, Laura
2011-01-01
The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…
46 CFR 108.102 - Preemptive effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Preemptive effect. 108.102 Section 108.102 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT General § 108.102 Preemptive effect. The regulations in this part have preemptive effect over...
46 CFR 108.102 - Preemptive effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Preemptive effect. 108.102 Section 108.102 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT General § 108.102 Preemptive effect. The regulations in this part have preemptive effect over...
46 CFR 108.102 - Preemptive effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Preemptive effect. 108.102 Section 108.102 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT General § 108.102 Preemptive effect. The regulations in this part have preemptive effect over...
Organ donation and pre-emptive kidney transplantation: ethical issues.
Petrini, C
2013-01-01
There is considerable evidence that pre-emptive transplants have several clinical advantages. However, pre-emptive transplants raise a number of ethical issues. Pre-emptive transplants from living donors offer distinctly greater benefits than those from deceased donors and some pre-emptive transplantation programmes actively encourage living organ donations. Moreover, the offer of a pre-emptive transplant to a patient who is not yet on dialysis unquestionably penalises patients already on dialysis who may have been on the waiting list for a long time. Therefore preemptive transplants give rise to conflicts between justice and utility. Several factors should be considered: health conditions, clinical urgency, probability of imminent worsening of a patient's clinical condition, the future chances of finding a matching organ, and others. From the various values at stake, ethical issues are analysed in search of an acceptable synthesis.
12 CFR 7.2021 - Preemptive rights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 1 2010-01-01 2010-01-01 false Preemptive rights. 7.2021 Section 7.2021 Banks... Corporate Practices § 7.2021 Preemptive rights. A national bank in its articles of association must grant or deny preemptive rights to the bank's shareholders. Any amendment to a national bank's articles of...
Changes in Blood Pressure and Heart Rate during Fixed-Interval Responding in Squirrel Monkeys
ERIC Educational Resources Information Center
DeWeese, Jo
2009-01-01
Episodic and sustained increases in heart rate and mean arterial blood pressure can occur with recurring patterns of schedule-controlled behavior. Most previous studies were conducted under fixed-ratio schedules, which maintained a consistent high rate of responding that alternated with periods of no responding during times when the schedule was…
Scheduling job shop - A case study
NASA Astrophysics Data System (ADS)
Abas, M.; Abbas, A.; Khan, W. A.
2016-08-01
The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.
ERIC Educational Resources Information Center
Williams, Dean C.; Saunders, Kathryn J.; Perone, Michael
2011-01-01
We conducted three experiments to reproduce and extend Perone and Courtney's (1992) study of pausing at the beginning of fixed-ratio schedules. In a multiple schedule with unequal amounts of food across two components, they found that pigeons paused longest in the component associated with the smaller amount of food (the lean component), but only…
ERIC Educational Resources Information Center
Tiger, Jeffrey H.; Toussaint, Karen A.; Roath, Christopher T.
2010-01-01
The current study compared the effects of choice and no-choice reinforcement conditions on the task responding of 3 children with autism across 2 single-operant paradigm reinforcer assessments. The first assessment employed simple fixed-ratio (FR) schedules; the second used progressive-ratio (PR) schedules. The latter assessment identified the…
ERIC Educational Resources Information Center
Pinkston, Jonathan W.; Branch, Marc N.
2004-01-01
Daily administration of cocaine often results in the development of tolerance to its effects on responding maintained by fixed-ratio schedules. Such effects have been observed to be greater when the ratio value is small, whereas less or no tolerance has been observed at large ratio values. Similar schedule-parameter-dependent tolerance, however,…
ERIC Educational Resources Information Center
Foster, T. Mary; Sumpter, Catherine E.; Temple, William; Flevill, Amanda; Poling, Alan
2009-01-01
Concurrent schedules were used to establish 6 hens' preferences for three foods. The resulting biases suggested wheat was preferred over honey-puffed and puffed wheat, and puffed wheat was the least preferred food. The hens then responded under fixed-ratio schedules for each food in 40-min (excluding reinforcer time) sessions, with the response…
Morphine Tolerance as a Function of Ratio Schedule: Response Requirement or Unit Price?
ERIC Educational Resources Information Center
Hughes, Christine; Sigmon, Stacey C.; Pitts, Raymond C.; Dykstra, Linda A.
2005-01-01
Key pecking by 3 pigeons was maintained by a multiple fixed-ratio 10, fixed-ratio 30, fixed-ratio 90 schedule of food presentation. Components differed with respect to amount of reinforcement, such that the unit price was 10 responses per 1-s access to food. Acute administration of morphine, "l"-methadone, and cocaine dose-dependently decreased…
Second-order schedules: discrimination of components1
Squires, Nancy; Norborg, James; Fantino, Edmund
1975-01-01
Pigeons were exposed to a series of second-order schedules in which the completion of a fixed number of fixed-interval components produced food. In Experiment 1, brief (2 sec) stimulus presentations occurred as each fixed-interval component was completed. During the brief-stimulus presentation terminating the last fixed-interval component, a response was required on a second key, the brief-stimulus key, to produce food. Responses on the brief-stimulus key before the last brief-stimulus presentation had no scheduled consequences, but served as a measure of the extent to which the final component was discriminated from preceding components. Whether there were one, two, four, or eight fixed-interval components, responses on the brief-stimulus key occurred during virtually every brief-stimulus presentation. In Experiment 2, an attempt was made to punish unnecessary responses on the brief-stimulus key, i.e., responses on the brief-stimulus key that occurred before the last component. None of the pigeons learned to withhold these responses, even though they produced a 15-sec timeout and loss of primary reinforcement. In Experiment 3, different key colors were associated with each component of a second-order schedule (a chain schedule). In contrast to Experiment 1, brief-stimulus key responses were confined to the last component. It was concluded that pigeons do not discriminate well between components of second-order schedules unless a unique exteroceptive cue is provided for each component. The relative discriminability of the components may account for the observed differences in initial-component response rates between comparable brief-stimulus, tandem, and chain schedules. PMID:16811868
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dustin, R.
Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less
A subjective scheduler for subjective dedicated networks
NASA Astrophysics Data System (ADS)
Suherman; Fakhrizal, Said Reza; Al-Akaidi, Marwan
2017-09-01
Multiple access technique is one of important techniques within medium access layer in TCP/IP protocol stack. Each network technology implements the selected access method. Priority can be implemented in those methods to differentiate services. Some internet networks are dedicated for specific purpose. Education browsing or tutorial video accesses are preferred in a library hotspot, while entertainment and sport contents could be subjects of limitation. Current solution may use IP address filter or access list. This paper proposes subjective properties of users or applications are used for priority determination in multiple access techniques. The NS-2 simulator is employed to evaluate the method. A video surveillance network using WiMAX is chosen as the object. Subjective priority is implemented on WiMAX scheduler based on traffic properties. Three different traffic sources from monitoring video: palace, park, and market are evaluated. The proposed subjective scheduler prioritizes palace monitoring video that results better quality, xx dB than the later monitoring spots.
Kelly, J; Hurley, D; Raghu, G
2000-04-01
CMV disease remains a major complication of lung transplantation and attempts to prevent it have met with marginal success. In a previous study we documented that universal prophylaxis did not prevent CMV disease but merely delayed it, and was very costly. We compared the efficacy and cost of pre-emptive therapy with ganciclovir, guided by CMV antigenemia, to that of historic controls that received universal prophylaxis with ganciclovir. CMV antigenemia assay was done routinely and pre-emptive therapy was initiated if greater than 25 CMV positive cells per 100,000 polymorphonuclear cells were found. Nineteen patients were enrolled; 6 of of whom received 12 courses of pre-emptive therapy. The incidence of CMV disease was 26% compared to 38% for the historical controls (p = 0.51). None of the patients that received pre-emptive therapy developed CMV disease following that therapy. Antigenemia failed to predict disease in 5 patients that developed it, and thus it is unknown if pre-emptive therapy could have prevented it. There was no mortality in either the study patients or historic controls directly related to CMV. The net savings with pre-emptive therapy was $2569 per patient. We conclude that pre-emptive therapy with ganciclovir is as safe and effective as universal prophylaxis in preventing CMV disease in lung transplant recipients, and is less expensive. The appropriate surveillance technique and timing remain to be determine to optimize the efficacy of pre-emptive therapy.
Separating the effects of interreinforcement time and number of interreinforcement responses1
Neuringer, Allen J.; Schneider, Bruce A.
1968-01-01
The relative importance of interreinforcement time and interreinforcement responses was evaluated by varying each independently. To do this, a blackout was presented after each nonreinforced response under both fixed-ratio and fixed-interval schedules of reinforcement. Manipulating the blackout duration under the fixed-ratio schedule caused interreinforcement time to vary without affecting the number of interreinforcement responses. Pigeons' post-reinforcement and post-blackout response latencies were found to increase linearly with interreinforcement time. Under the fixed-interval schedule, the same blackout manipulations changed the number of interreinforcement responses without affecting interreinforcement time. Post-reinforcement and post-blackout response latencies under this condition were approximately constant. These results suggest that responding is controlled by interreinforcement time and is not influenced by the number of responses emitted between reinforcements. PMID:16811313
Álvarez Lerma, F; Granado Solano, J; García Sanz, A; López Martínez, C; Herrera Sebastián, R; Salvat Cobeta, C; Rey Pérez, A; Balaguer Blasco, R M; Plasencia, V; Horcajada, J P
2015-12-01
Pre-emptive isolation refers to the application of contact precaution measures in patients with strongly suspected colonization by multiresistant bacteria. To assess the impact of an intervention program involving the implementation of a consensus-based protocol of pre-emptive isolation (CPPI) on admission to a polyvalent ICU of a general hospital. A comparative analysis of 2 patient cohorts was made: a historical cohort including patients in which pre-emptive isolation was established according to physician criterion prior to starting CPPI (from January 2010 to February 2011), and a prospective cohort including patients in which CPPI was implemented (from March to November 2011). CPPI included the identification and diffusion of pre-emptive isolation criteria, the definition of sampling methodology, the evaluation of results, and the development of criteria for discontinuation of pre-emptive isolation. Pre-emptive isolation was indicated by the medical staff, and follow-up was conducted by the nursing staff. Pre-emptive isolation was defined as "adequate" when at least one multiresistant bacteria was identified in any of the samples. Comparison of data between the 2 periods was made with the chi-square test for categorical variables and the Student t-test for quantitative variables. Statistical significance was set at P<.05. Among the 1,740 patients admitted to the ICU (1,055 during the first period and 685 during the second period), pre-emptive isolation was indicated in 199 (11.4%); 111 (10.5%) of these subjects corresponded to the historical cohort (control group) and 88 (12.8%) to the posterior phase after the implementation of CPPI (intervention group). No differences were found in age, APACHE II score or patient characteristics between the 2 periods. The implementation of CPPI was related to decreases in non-indicated pre-emptive isolations (29.7 vs. 6.8%, P<.001), time of requesting surveillance cultures (1.56 vs. 0.37 days, P<.001), and days of duration of treatment (4.77 vs. 3.58 days, P<.001). In 44 patients (22.1%) in which pre-emptive isolation was indicated, more than one multiresistant bacteria was identified, with an "adequate pre-emptive isolation rate" of 19.8% in the first period and 25.0% in the second period (P<.382). The implementation of CPPI resulted in a significant decrease in pre-emptive isolations which were not indicated correctly, a decrease in the time elapsed between isolation and collection of samples, and a decrease in the duration of isolation measures in cases in which isolation was unnecessary, without increasing the rate of "adequate pre-emptive isolation". Copyright © 2015 Elsevier España, S.L.U. and SEMICYUC. All rights reserved.
Peters, V; de Rijk, A; Engels, J; Heerkens, Y; Nijhuis, F
2016-04-07
Work schedules contribute substantially to the health and well-being of nurses. Too broad typologies are used in research that do not meet the current variety in work schedules. To develop a new typology for nurses' work schedules based on five requirements and to validate the typology. This study is based on a questionnaire returned by 498 nurses (response 51%) including questions regarding nurses' work schedule, socio-demographic, and family characteristics and their appraisal of the work schedule. Frequencies of the different schedules were computed to determine the typology. To validate the typology, differences between the types were tested with ANOVAs, Chi2 and Kruskal-Wallis tests. Five main types can be distinguished based on predetermined requirements and frequencies, namely: (1) fixed early shift, (2) rotating two shift pattern without night shift, (3) rotating three shift pattern, (4) fixed and rotating two shift pattern including night shift, and (5) fixed normal day or afternoon shifts. Nurses in these types of work schedule differed significantly with respect to hours worked, days off between shifts, age, education, years in the job, commuting time, contribution to household income, satisfaction with work schedule and work schedule control. Especially nurses with type 3 schedules differed from other types. A typology of five main types of work schedules is proposed. Content validity of the typology is sufficient and the new typology seems useful for research on work-related aspects of nursing.
49 CFR 239.5 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 239.5 Section 239.5 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PASSENGER TRAIN EMERGENCY PREPAREDNESS General § 239.5 Preemptive effect. Under...
Deng, Li-Qin; Hou, Lei-Na; Song, Feng-Xiang; Zhu, Han-Yue; Zhao, Hai-Ying; Chen, Gang; Li, Jing-Jing
2017-01-01
To the best of our knowledge, the effect of pre-emptively blocking pain transmission on acute postoperative cognitive dysfunction (POCD) has not yet been assessed. Therefore, the present study aimed to investigate the effect of pre-emptive analgesia via a continuous femoral nerve block (CFNB) on postoperative pain and early cognitive function following total knee arthroplasty (TKA) surgery in elderly patients. CFNB was performed prior to TKA surgery in the pre-emptive analgesia group (n=30) and following TKA surgery in the control group (n=30). POCD was defined as a two-point reduction in the postoperative score compared with the preoperative score in the mini-mental state examination. The visual analog scale (VAS) was used to evaluate the intensity of pain at rest and during exercise. The intraoperative dose of remifentanil in the pre-emptive analgesia group was significantly lower than in the control group (P<0.01). In the preemptive analgesia group, VAS scores at three days post-surgery were lower than those in the control group (P<0.01). The incidence of POCD on the third postoperative day was slightly lower in the pre-emptive analgesia group compared with the control group. In conclusion, the results demonstrate that pre-emptive analgesia by CFNB may promote the recovery of early cognitive function following TKA in elderly patients. PMID:28413514
Deng, Li-Qin; Hou, Lei-Na; Song, Feng-Xiang; Zhu, Han-Yue; Zhao, Hai-Ying; Chen, Gang; Li, Jing-Jing
2017-04-01
To the best of our knowledge, the effect of pre-emptively blocking pain transmission on acute postoperative cognitive dysfunction (POCD) has not yet been assessed. Therefore, the present study aimed to investigate the effect of pre-emptive analgesia via a continuous femoral nerve block (CFNB) on postoperative pain and early cognitive function following total knee arthroplasty (TKA) surgery in elderly patients. CFNB was performed prior to TKA surgery in the pre-emptive analgesia group (n=30) and following TKA surgery in the control group (n=30). POCD was defined as a two-point reduction in the postoperative score compared with the preoperative score in the mini-mental state examination. The visual analog scale (VAS) was used to evaluate the intensity of pain at rest and during exercise. The intraoperative dose of remifentanil in the pre-emptive analgesia group was significantly lower than in the control group (P<0.01). In the preemptive analgesia group, VAS scores at three days post-surgery were lower than those in the control group (P<0.01). The incidence of POCD on the third postoperative day was slightly lower in the pre-emptive analgesia group compared with the control group. In conclusion, the results demonstrate that pre-emptive analgesia by CFNB may promote the recovery of early cognitive function following TKA in elderly patients.
Strategic workload management and decision biases in aviation
NASA Technical Reports Server (NTRS)
Raby, Mireille; Wickens, Christopher D.
1994-01-01
Thirty pilots flew three simulated landing approaches under conditions of low, medium, and high workload. Workload conditions were created by varying time pressure and external communications requirements. Our interest was in how the pilots strategically managed or adapted to the increasing workload. We independently assessed the pilot's ranking of the priority of different discrete tasks during the approach and landing. Pilots were found to sacrifice some aspects of primary flight control as workload increased. For discrete tasks, increasing workload increased the amount of time in performing the high priority tasks, decreased the time in performing those of lowest priority, and did not affect duration of performance episodes or optimality of scheduling of tasks of any priority level. Individual differences analysis revealed that high-performing subjects scheduled discrete tasks earlier in the flight and shifted more often between different activities.
49 CFR 220.2 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 220.2 Section 220.2 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD COMMUNICATIONS General § 220.2 Preemptive effect. Link to an amendment...
Preemptive Deceased Donor Kidney Transplantation: Considerations of Equity and Utility
Chen, B. Po-Han; Coresh, Josef; Segev, Dorry L.
2013-01-01
Summary Background and objectives There exists gross disparity in national deceased donor kidney transplant availability and practice: waiting times exceed 6 years in some regions, but some patients receive kidneys before they require dialysis. This study aimed to quantify and characterize preemptive deceased donor kidney transplant recipients and compare their outcomes with patients transplanted shortly after dialysis initiation. Design, setting, participants, & measurements Using the Scientific Registry of Transplant Recipients database, first-time adult deceased donor kidney transplant recipients between 1995 and 2011 were classified as preemptive, early (on dialysis≤1 year), or late recipients. Random effects logistic regression and multivariate Cox proportional hazards regression were used to identify characteristics of preemptive deceased donor kidney transplant and evaluate survival in preemptive and early recipients, respectively. Results Preemptive recipients were 9.0% of the total recipient population. Patients with private insurance (adjusted odds ratio=3.15, 95% confidence interval=3.01–3.29, P<0.001), previous (nonkidney) transplant (adjusted odds ratio=1.94, 95% confidence interval=1.67–2.26, P<0.001), and zero-antigen mismatch (adjusted odds ratio=1.45, 95% confidence interval=1.37–1.54, P<0.001; Caucasians only) were more likely to receive preemptive deceased donor kidney transplant, even after accounting for center-level clustering. African Americans were less likely to receive preemptive deceased donor kidney transplant (adjusted odds ratio=0.44, 95% confidence interval=0.41–0.47, P<0.001). Overall, patients transplanted preemptively had similar survival compared with patients transplanted within 1 year after initiating dialysis (adjusted hazard ratio=1.06, 95% confidence interval=0.99–1.12, P=0.07). Conclusions Preemptive deceased donor kidney transplant occurs most often among Caucasians with private insurance, and survival is fairly similar to survival of recipients on dialysis for <1 year. PMID:23371953
15 CFR 200.110 - Priorities and time of completion.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Priorities and time of completion. 200..., SERVICES, PROCEDURES, AND FEES § 200.110 Priorities and time of completion. Schedule work assignments for calibrations and other tests will generally be made in the order in which confirmed requests are received...
49 CFR 214.4 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 214.4 Section 214.4 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD WORKPLACE SAFETY General § 214.4 Preemptive effect. Under 49 U.S.C...
49 CFR 227.7 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 227.7 Section 227.7 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OCCUPATIONAL NOISE EXPOSURE General § 227.7 Preemptive effect. Under 49 U.S.C...
49 CFR 213.2 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 213.2 Section 213.2 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRACK SAFETY STANDARDS General § 213.2 Preemptive effect. Under 49 U.S.C. 20106...
Knowledge-based systems for power management
NASA Technical Reports Server (NTRS)
Lollar, L. F.
1992-01-01
NASA-Marshall's Electrical Power Branch has undertaken the development of expert systems in support of further advancements in electrical power system automation. Attention is given to the features (1) of the Fault Recovery and Management Expert System, (2) a resource scheduler or Master of Automated Expert Scheduling Through Resource Orchestration, and (3) an adaptive load-priority manager, or Load Priority List Management System. The characteristics of an advisory battery manager for the Hubble Space Telescope, designated the 'nickel-hydrogen expert system', are also noted.
Craig, David Philip Arthur; Varnon, Christopher A.; Sokolowski, Michel B. C.; Wells, Harrington; Abramson, Charles I.
2014-01-01
Interval timing is a key element of foraging theory, models of predator avoidance, and competitive interactions. Although interval timing is well documented in vertebrate species, it is virtually unstudied in invertebrates. In the present experiment, we used free-flying honey bees (Apis mellifera ligustica) as a model for timing behaviors. Subjects were trained to enter a hole in an automated artificial flower to receive a nectar reinforcer (i.e. reward). Responses were continuously reinforced prior to exposure to either a fixed interval (FI) 15-sec, FI 30-sec, FI 60-sec, or FI 120-sec reinforcement schedule. We measured response rate and post-reinforcement pause within each fixed interval trial between reinforcers. Honey bees responded at higher frequencies earlier in the fixed interval suggesting subject responding did not come under traditional forms of temporal control. Response rates were lower during FI conditions compared to performance on continuous reinforcement schedules, and responding was more resistant to extinction when previously reinforced on FI schedules. However, no “scalloped” or “break-and-run” patterns of group or individual responses reinforced on FI schedules were observed; no traditional evidence of temporal control was found. Finally, longer FI schedules eventually caused all subjects to cease returning to the operant chamber indicating subjects did not tolerate the longer FI schedules. PMID:24983960
Hui, C-K; Cheung, W W W; Au, W-Y; Lie, A K W; Zhang, H-Y; Yueng, Y-H; Wong, B C Y; Leung, N; Kwong, Y-L; Liang, R; Lau, G K K
2005-11-01
The hepatic outcome of hepatitis B surface antigen (HBsAg) positive patients undergoing chemotherapy after withdrawal of pre-emptive lamivudine is unknown. To examine the occurrence of hepatitis B virus (HBV) reactivation after withdrawal of pre-emptive lamivudine. Pre-emptive lamivudine was started one week before initiation of chemotherapy in 46 consecutive HBsAg positive patients and continued for the entire duration of chemotherapy. Pre-emptive lamivudine was stopped at a median 3.1 (range 3.0-3.4) months after completion of chemotherapy. Patients were longitudinally followed up after withdrawal of pre-emptive lamivudine. Median time of follow up after withdrawal of lamivudine was 25.7 (range 5.7-75.7) months. Eleven of the 46 patients (23.9%) developed HBV reactivation after withdrawal of pre-emptive lamivudine. Eight of the 16 patients with high pre-chemotherapy HBV DNA (> or =10(4) copies/ml) compared with three of the 30 patients with low pre-chemotherapy HBV DNA (<10(4) copies/ml) developed HBV reactivation (50.0% v 10.0%, respectively; p<0.001). Hepatitis B e antigen positive patients were also more likely to develop HBV reactivation (5/11 (45.5%) v 6/35 (17.1%), respectively; p = 0.041). A high pre-chemotherapy HBV DNA (> or =10(4) copies/ml) was the most important risk factor for HBV reactivation after withdrawal of pre-emptive lamivudine on Cox proportional hazards analysis (relative risk 16.13, (95% confidence interval 2.99-87.01; p = 0.001). HBV reactivation is more likely to occur in patients with high pre-chemotherapy HBV DNA after withdrawal of pre-emptive lamivudine. A more prolonged course of antiviral therapy may be necessary in these patients after completion of chemotherapy in order to reduce post-chemotherapy HBV reactivation.
A task scheduler framework for self-powered wireless sensors.
Nordman, Mikael M
2003-10-01
The cost and inconvenience of cabling is a factor limiting widespread use of intelligent sensors. Recent developments in short-range, low-power radio seem to provide an opening to this problem, making development of wireless sensors feasible. However, for these sensors the energy availability is a main concern. The common solution is either to use a battery or to harvest ambient energy. The benefit of harvested ambient energy is that the energy feeder can be considered as lasting a lifetime, thus it saves the user from concerns related to energy management. The problem is, however, the unpredictability and unsteady behavior of ambient energy sources. This becomes a main concern for sensors that run multiple tasks at different priorities. This paper proposes a new scheduler framework that enables the reliable assignment of task priorities and scheduling in sensors powered by ambient energy. The framework being based on environment parameters, virtual queues, and a state machine with transition conditions, dynamically manages task execution according to priorities. The framework is assessed in a test system powered by a solar panel. The results show the functionality of the framework and how task execution reliably is handled without violating the priority scheme that has been assigned to it.
Active Solution Space and Search on Job-shop Scheduling Problem
NASA Astrophysics Data System (ADS)
Watanabe, Masato; Ida, Kenichi; Gen, Mitsuo
In this paper we propose a new searching method of Genetic Algorithm for Job-shop scheduling problem (JSP). The coding method that represent job number in order to decide a priority to arrange a job to Gannt Chart (called the ordinal representation with a priority) in JSP, an active schedule is created by using left shift. We define an active solution at first. It is solution which can create an active schedule without using left shift, and set of its defined an active solution space. Next, we propose an algorithm named Genetic Algorithm with active solution space search (GA-asol) which can create an active solution while solution is evaluated, in order to search the active solution space effectively. We applied it for some benchmark problems to compare with other method. The experimental results show good performance.
Automated control of hierarchical systems using value-driven methods
NASA Technical Reports Server (NTRS)
Pugh, George E.; Burke, Thomas E.
1990-01-01
An introduction is given to the Value-driven methodology, which has been successfully applied to solve a variety of difficult decision, control, and optimization problems. Many real-world decision processes (e.g., those encountered in scheduling, allocation, and command and control) involve a hierarchy of complex planning considerations. For such problems it is virtually impossible to define a fixed set of rules that will operate satisfactorily over the full range of probable contingencies. Decision Science Applications' value-driven methodology offers a systematic way of automating the intuitive, common-sense approach used by human planners. The inherent responsiveness of value-driven systems to user-controlled priorities makes them particularly suitable for semi-automated applications in which the user must remain in command of the systems operation. Three examples of the practical application of the approach in the automation of hierarchical decision processes are discussed: the TAC Brawler air-to-air combat simulation is a four-level computerized hierarchy; the autonomous underwater vehicle mission planning system is a three-level control system; and the Space Station Freedom electrical power control and scheduling system is designed as a two-level hierarchy. The methodology is compared with rule-based systems and with other more widely-known optimization techniques.
46 CFR 147.1 - Purpose; applicability; preemptive effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 5 2014-10-01 2014-10-01 false Purpose; applicability; preemptive effect. 147.1 Section 147.1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES HAZARDOUS SHIPS' STORES General Provisions § 147.1 Purpose; applicability; preemptive effect. (a) This part...
46 CFR 147.1 - Purpose; applicability; preemptive effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 5 2013-10-01 2013-10-01 false Purpose; applicability; preemptive effect. 147.1 Section 147.1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES HAZARDOUS SHIPS' STORES General Provisions § 147.1 Purpose; applicability; preemptive effect. (a) This part...
46 CFR 147.1 - Purpose; applicability; preemptive effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 5 2012-10-01 2012-10-01 false Purpose; applicability; preemptive effect. 147.1 Section 147.1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DANGEROUS CARGOES HAZARDOUS SHIPS' STORES General Provisions § 147.1 Purpose; applicability; preemptive effect. (a) This part...
49 CFR 1580.109 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 9 2010-10-01 2010-10-01 false Preemptive effect. 1580.109 Section 1580.109 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION... Materials Receivers, and Private Cars § 1580.109 Preemptive effect. Under 49 U.S.C. 20106, issuance of the...
49 CFR 232.13 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 232.13 Section 232.13 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... EQUIPMENT; END-OF-TRAIN DEVICES General § 232.13 Preemptive effect. (a) Under 49 U.S.C. 20106, issuance of...
49 CFR 241.17 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 241.17 Section 241.17 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... OPERATIONS § 241.17 Preemptive effect. Under 49 U.S.C. 20106, the regulations in this part preempt any State...
Strategies GeoCape Intelligent Observation Studies @ GSFC
NASA Technical Reports Server (NTRS)
Cappelaere, Pat; Frye, Stu; Moe, Karen; Mandl, Dan; LeMoigne, Jacqueline; Flatley, Tom; Geist, Alessandro
2015-01-01
This presentation provides information a summary of the tradeoff studies conducted for GeoCape by the GSFC team in terms of how to optimize GeoCape observation efficiency. Tradeoffs include total ground scheduling with simple priorities, ground scheduling with cloud forecast, ground scheduling with sub-area forecast, onboard scheduling with onboard cloud detection and smart onboard scheduling and onboard image processing. The tradeoffs considered optimzing cost, downlink bandwidth and total number of images acquired.
Mele et al. (1986) reported exposure to Aroclor 1248 (A1248) in rhesus monkeys produced an increased rate of responding under a fixed-interval (FI) schedule of reinforcement in which 25% of the scheduled reinforcers were omitted. The purpose of this work was to determine whether...
Effects of Historical and Social Variables on Instruction Following
ERIC Educational Resources Information Center
Kroger-Costa, Andreia; Abreu-Rodrigues, Josele
2012-01-01
The present study investigated the effect of the presence of the experimenter on behavioral sensitivity to contingency change. In history training, college students were exposed to differential reinforcement of low rate (DRL) and fixed-ratio (FR) schedules, and in testing, to a fixed-interval (FI) schedule. For the control group, instructions were…
49 CFR 240.5 - Preemptive effect and construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect and construction. 240.5 Section 240.5 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD... § 240.5 Preemptive effect and construction. (a) Under 49 U.S.C. 20106, issuance of the regulations in...
NASA Astrophysics Data System (ADS)
Wang, Honghuan; Xing, Fangyuan; Yin, Hongxi; Zhao, Nan; Lian, Bizhan
2016-02-01
With the explosive growth of network services, the reasonable traffic scheduling and efficient configuration of network resources have an important significance to increase the efficiency of the network. In this paper, an adaptive traffic scheduling policy based on the priority and time window is proposed and the performance of this algorithm is evaluated in terms of scheduling ratio. The routing and spectrum allocation are achieved by using the Floyd shortest path algorithm and establishing a node spectrum resource allocation model based on greedy algorithm, which is proposed by us. The fairness index is introduced to improve the capability of spectrum configuration. The results show that the designed traffic scheduling strategy can be applied to networks with multicast and broadcast functionalities, and makes them get real-time and efficient response. The scheme of node spectrum configuration improves the frequency resource utilization and gives play to the efficiency of the network.
Preemptive clinical pharmacogenetics implementation: current programs in five US medical centers.
Dunnenberger, Henry M; Crews, Kristine R; Hoffman, James M; Caudle, Kelly E; Broeckel, Ulrich; Howard, Scott C; Hunkler, Robert J; Klein, Teri E; Evans, William E; Relling, Mary V
2015-01-01
Although the field of pharmacogenetics has existed for decades, practioners have been slow to implement pharmacogenetic testing in clinical care. Numerous publications describe the barriers to clinical implementation of pharmacogenetics. Recently, several freely available resources have been developed to help address these barriers. In this review, we discuss current programs that use preemptive genotyping to optimize the pharmacotherapy of patients. Array-based preemptive testing includes a large number of relevant pharmacogenes that impact multiple high-risk drugs. Using a preemptive approach allows genotyping results to be available prior to any prescribing decision so that genomic variation may be considered as an inherent patient characteristic in the planning of therapy. This review describes the common elements among programs that have implemented preemptive genotyping and highlights key processes for implementation, including clinical decision support.
Effects Of Reinforcement History On Response Rate And Response Pattern In Periodic Reinforcement
López, Florente; Menez, Marina
2005-01-01
Several researchers have suggested that conditioning history may have long-term effects on fixed-interval performances of rats. To test this idea and to identify possible factors involved in temporal control development, groups of rats initially were exposed to different reinforcement schedules: continuous, fixed-time, and random-interval. Afterwards, half of the rats in each group were studied on a fixed-interval 30-s schedule of reinforcement and the other half on a fixed-interval 90-s schedule of reinforcement. No evidence of long-term effects attributable to conditioning history on either response output or response patterning was found; history effects were transitory. Different tendencies in trajectory across sessions were observed for measures of early and late responding within the interreinforcer interval, suggesting that temporal control is the result of two separate processes: one involved in response output and the other in time allocation of responding and not responding. PMID:16047607
Macaskill, Anne C; Branch, Marc N
2012-01-01
The schedule of reinforcement under which behavior is maintained is an important contributor to whether tolerance to the behavioral effects of cocaine develops. Schedule parameter value (for example, fixed-ratio size) has been shown to affect the development of tolerance under some schedule types but not others, but the specific procedural variables causing this effect remain to be identified. To date, schedule-parameter-related tolerance has developed when a longer pause after reinforcement does not lead to a shorter delay between the response that ends the pause and reinforcement. The current study investigated the importance of this variable in pigeons using a multiple chained Fixed-Ratio 1, Fixed-Time x schedule, in which the first key peck in a trial produced a stimulus change and initiated a delay at the end of which food was presented regardless of whether or not additional pecks were made during the delay. Dose-response curves were assessed before, during and after chronic (daily) administration of cocaine. Tolerance to the pause-increasing effects of cocaine occurred to a similar degree regardless of the scheduled time between the end of the pause and reinforcement. Therefore, the relationship between pause length and delay to reinforcement does not provide an explanation for schedule-parameter-related tolerance. Copyright © 2011 Elsevier Inc. All rights reserved.
Mizushima, Daisuke; Nishijima, Takeshi; Gatanaga, Hiroyuki; Tsukada, Kunihisa; Teruya, Katsuji; Kikuchi, Yoshimi; Oka, Shinichi
2013-01-01
Background The efficacy of preemptive therapy against cytomegalovirus (CMV) infection remains unknown in treatment-naïve patients with advanced HIV-1 infection in the HAART era. Methods The subjects of this single-center observation study were126 treatment-naïve HIV-1 infected patients with positive CMV viremia between January 1, 2000 and December 31, 2006. Inclusion criteria were age more than 17 years, CD4 count less than 100/μl, plasma CMV DNA positive, never having received antiretroviral therapy (ART) and no CMV end-organ disease (EOD) at first visit. The incidence of CMV-EOD was compared in patients with and without preemptive therapy against CMV-EOD. The effects of the CMV preemptive therapy were estimated in uni- and multivariate Cox hazards models. Results CMV-EOD was diagnosed in 30 of the 96 patients of the non-preemptive therapy group (31%, 230.3 per 1000 person-years), compared with 3 of the 30 patients of the preemptive therapy group (10%, 60.9 per 1000 person-years). Univariate (HR = 0.286; 95%CI, 0.087–0.939; p = 0.039) and multivariate (adjusted HR = 0.170; 95%CI, 0.049–0.602; p = 0.005) analyses confirmed that CMV-EOD is significantly prevented by CMV preemptive therapy. Multivariate analysis showed that plasma CMV DNA level correlated significantly with CMV-EOD (per log10/ml, adjusted HR = 1.941; 95%CI, 1.266–2.975; p = 0.002). Among the 30 patients on preemptive therapy, 7 (23.3%) developed grade 3–4 leukopenia. The mortality rate was not significantly different between the two groups (p = 0.193, Log-rank test). Conclusions The results indicate that preemptive therapy lowers the incidence of CMV-EOD by almost 25%. Preemptive therapy for treatment-naïve patients with CMV viremia is effective, although monitoring of potential treatment-related side effects is required. PMID:23724140
Patients' views on priority setting in neurosurgery: A qualitative study.
Gunaratnam, Caroline; Bernstein, Mark
2016-01-01
Accountability for Reasonableness is an ethical framework which has been implemented in various health care systems to improve and evaluate the fairness of priority setting. This framework is grounded on four mandatory conditions: relevance, publicity, appeals, and enforcement. There have been few studies which have evaluated the patient stakeholders' acceptance of this framework; certainly no studies have been done on patients' views on the prioritization system for allocating patients for operating time in a system with pressure on the resource of inpatient beds. The aim of this study is to examine neurosurgical patients' views on the prioritization of patients for operating theater (OT) time on a daily basis at a tertiary and quaternary referral neurosurgery center. Semi-structured face-to-face interviews were conducted with thirty-seven patients, recruited from the neurosurgery clinic at Toronto Western Hospital. Family members and friends who accompanied the patient to their clinic visit were encouraged to contribute to the discussion. Interviews were audio recorded, transcribed verbatim, and subjected to thematic analysis using open and axial coding. Overall, patients are supportive of the concept of a priority-setting system based on fairness, but felt that a few changes would help to improve the fairness of the current system. These changes include lowering the level of priority given to volume-funded cases and providing scheduled surgeries that were previously canceled a higher level of prioritization. Good communication, early notification, and rescheduling canceled surgeries as soon as possible were important factors that directly reflected the patients' confidence level in their doctor, the hospital, and the health care system. This study is the first clinical qualitative study of patients' perspective on a prioritization system used for allocating neurosurgical patients for OT time on a daily basis in a socialized not-for-profit health care system with fixed resources.
Barriers to preemptive renal transplantation: a single center questionnaire study.
Knight, Richard J; Teeter, Larry D; Graviss, Edward A; Patel, Samir J; DeVos, Jennifer M; Moore, Linda W; Gaber, A Osama
2015-03-01
Preemptive transplantation results in excellent patient and graft survival yet most transplant candidates are referred for transplantation after initiation of dialysis. The goal of this study was to determine barriers to preemptive renal transplantation. A nonvalidated questionnaire was administered to prospective kidney transplant recipients to determine factors that hindered or favored referral for transplantation before the initiation of dialysis. One hundred ninety-seven subjects referred for a primary renal transplant completed the questionnaire. Ninety-one subjects (46%) had been informed of preemptive transplantation before referral, and 80 (41%) were predialysis at the time of evaluation. The median time from diagnosis of renal disease to referral was 60 months (range, 2-444 months). In bivariate analysis, among other factors, knowledge of preemptive transplantation was highly associated (odds ratio=94.69) with referral before initiation of dialysis. Given the strong association between knowledge of preemptive transplantation and predialysis referral, this variable was not included in the multivariate analysis. Using multivariate logistic regression analysis, white recipient race, referral by a transplant nephrologist, recipient employment, and the diagnosis of polycystic kidney disease were significantly associated with presentation to the pretransplant clinic before initiation of dialysis. The principle barrier to renal transplantation referral before dialysis was patient education regarding the option of preemptive transplantation. Factors significantly associated with referral before dialysis were the diagnosis of polycystic kidney disease, white recipient race, referral by a transplant nephrologist, and employed status. Greater effort should be applied to patient education regarding preemptive transplantation early after the diagnosis of end-stage renal disease.
Evaluation of Fixed Momentary DRO Schedules under Signaled and Unsignaled Arrangements
ERIC Educational Resources Information Center
Hammond, Jennifer L.; Iwata, Brian A.; Fritz, Jennifer N.; Dempsey, Carrie M.
2011-01-01
Fixed momentary schedules of differential reinforcement of other behavior (FM DRO) generally have been ineffective as treatment for problem behavior. Because most early research on FM DRO included presentation of a signal at the end of the DRO interval, it is unclear whether the limited effects of FM DRO were due to (a) the momentary response…
ERIC Educational Resources Information Center
Tomlin, Michelle; Reed, Phil
2012-01-01
The effects of fixed-time (FT) reinforcement schedules on the disruptive behavior of 4 students in special education classrooms were studied. Attention provided on FT schedules in the context of a multiple-baseline design across participants substantially decreased all students' challenging behavior. Disruptive behavior was maintained at levels…
Instructional versus schedule control of humans' choices in situations of diminishing returns
Hackenberg, Timothy D.; Joker, Veronica R.
1994-01-01
Four adult humans chose repeatedly between a fixed-time schedule (of points later exchangeable for money) and a progressive-time schedule that began at 0 s and increased by a fixed number of seconds with each point delivered by that schedule. Each point delivered by the fixed-time schedule reset the requirements of the progressive-time schedule to its minimum value. Subjects were provided with instructions that specified a particular sequence of choices. Under the initial conditions, the instructions accurately specified the optimal choice sequence. Thus, control by instructions and optimal control by the programmed contingencies both supported the same performance. To distinguish the effects of instructions from schedule sensitivity, the correspondence between the instructed and optimal choice patterns was gradually altered across conditions by varying the step size of the progressive-time schedule while maintaining the same instructions. Step size was manipulated, typically in 1-s units, first in an ascending and then in a descending sequence of conditions. Instructions quickly established control in all 4 subjects but, by narrowing the range of choice patterns, they reduced subsequent sensitivity to schedule changes. Instructional control was maintained across the ascending sequence of progressive-time values for each subject, but eventually diminished, giving way to more schedule-appropriate patterns. The transition from instruction-appropriate to schedule-appropriate behavior was characterized by an increase in the variability of choice patterns and local increases in point density. On the descending sequence of progressive-time values, behavior appeared to be schedule sensitive, sometimes even optimally sensitive, but it did not always change systematically with the contingencies, suggesting the involvement of other factors. PMID:16812747
NASA Astrophysics Data System (ADS)
Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen
2013-08-01
Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.
Dunnenberger, Henry M.; Crews, Kristine R.; Hoffman, James M.; Caudle, Kelly E.; Broeckel, Ulrich; Howard, Scott C.; Hunkler, Robert J.; Klein, Teri E.; Evans, William E.; Relling, Mary V.
2015-01-01
Although the field of pharmacogenetics has existed for decades, the implementation of, pharmacogenetic testing in clinical care has been slow. There are numerous publications, describing the barriers to clinical implementation of pharmacogenetics. Recently, several freely, available resources have been developed to help address these barriers. In this review we, discuss current programs that use preemptive genotyping to optimize the pharmacotherapy of, patients. Array-based preemptive testing includes a large number of relevant pharmacogenes, that impact multiple high-risk drugs. Using a preemptive approach allows genotyping results to, be available prior to any prescribing decision so that genomic variation may be considered as, an inherent patient characteristic in the planning of therapy. This review describes the common, elements among programs that have implemented preemptive genotyping and highlights key, processes for implementation, including clinical decision support. PMID:25292429
The Reinforcing Effects of Houselight Illumination during Chained Schedules of Food Presentation
ERIC Educational Resources Information Center
Allen, Ron; Kupfer, Jeff; Malagodi, E. F.
2008-01-01
Pigeons' keypecking was maintained under two- and three-component chained schedules of food presentation. The component schedules were all fixed-interval schedules of either 1- or 2-min duration. Across conditions the presence of houselight illumination within each component schedule was manipulated. For each pigeon, first-component response rates…
Kaneku, Hugo
2010-01-01
This chapter summarizes some of the recent findings published on the role in organ transplantation of HLA antibodies, and--more important--donor-specific HLA antibodies. The negative impact of both, preformed and de novo DSA is now better recognized in recipients of kidney, heart, lung, liver, pancreas, islet cells and bone marrow transplants. An appropriate design of a schedule to monitor HLA antibodies may identify patients at higher risk for immunological events earlier and allow interventions to avoid later graft loss. The value of strategies like preemptive treatment of antibodies and the use of new agents like bortezomib and eculizumab are of interest and need further investigation.
Job shop scheduling model for non-identic machine with fixed delivery time to minimize tardiness
NASA Astrophysics Data System (ADS)
Kusuma, K. K.; Maruf, A.
2016-02-01
Scheduling non-identic machines problem with low utilization characteristic and fixed delivery time are frequent in manufacture industry. This paper propose a mathematical model to minimize total tardiness for non-identic machines in job shop environment. This model will be categorized as an integer linier programming model and using branch and bound algorithm as the solver method. We will use fixed delivery time as main constraint and different processing time to process a job. The result of this proposed model shows that the utilization of production machines can be increase with minimal tardiness using fixed delivery time as constraint.
Hui, C-K; Cheung, W W W; Au, W-Y; Lie, A K W; Zhang, H-Y; Yueng, Y-H; Wong, B C Y; Leung, N; Kwong, Y-L; Liang, R; Lau, G K K
2005-01-01
Background: The hepatic outcome of hepatitis B surface antigen (HBsAg) positive patients undergoing chemotherapy after withdrawal of pre-emptive lamivudine is unknown. Aims: To examine the occurrence of hepatitis B virus (HBV) reactivation after withdrawal of pre-emptive lamivudine. Methods: Pre-emptive lamivudine was started one week before initiation of chemotherapy in 46 consecutive HBsAg positive patients and continued for the entire duration of chemotherapy. Pre-emptive lamivudine was stopped at a median 3.1 (range 3.0–3.4) months after completion of chemotherapy. Patients were longitudinally followed up after withdrawal of pre-emptive lamivudine. Results: Median time of follow up after withdrawal of lamivudine was 25.7 (range 5.7–75.7) months. Eleven of the 46 patients (23.9%) developed HBV reactivation after withdrawal of pre-emptive lamivudine. Eight of the 16 patients with high pre-chemotherapy HBV DNA (⩾104 copies/ml) compared with three of the 30 patients with low pre-chemotherapy HBV DNA (<104 copies/ml) developed HBV reactivation (50.0% v 10.0%, respectively; p<0.001). Hepatitis B e antigen positive patients were also more likely to develop HBV reactivation (5/11 (45.5%) v 6/35 (17.1%), respectively; p = 0.041). A high pre-chemotherapy HBV DNA (⩾104 copies/ml) was the most important risk factor for HBV reactivation after withdrawal of pre-emptive lamivudine on Cox proportional hazards analysis (relative risk 16.13, (95% confidence interval 2.99-87.01; p = 0.001). Conclusions: HBV reactivation is more likely to occur in patients with high pre-chemotherapy HBV DNA after withdrawal of pre-emptive lamivudine. A more prolonged course of antiviral therapy may be necessary in these patients after completion of chemotherapy in order to reduce post-chemotherapy HBV reactivation. PMID:16000641
Synchronization of Leisure Conflicts in the Family Schedule.
ERIC Educational Resources Information Center
Kelly, John R.
The model of the family as a set of contingent careers is brought into focus by Wilbert Moore's suggestions that in schedule synchronization the family takes priority in claiming time, the wife-mother asserts such claims and arranges the schedule, and common leisure activities symbolize the solidarity of the unit. The perception of parents of the…
Withrow, J R; Smith, E L; Koch, F H; Yemshanov, D
2015-03-01
In pest risk assessment it is frequently necessary to make time-critical decisions regarding management of expanding pest populations. When an invasive pest outbreak is expanding rapidly, preemptive quarantine of areas that are under imminent threat of infestation is one of only a few available management tools that can be implemented quickly to help control the expansion. The preemptive quarantine of locations that surround an infested area also acts as a safeguard to counteract the risk of failed detections of the pest in field surveys. In this paper, we present a method that assesses the suitability of preemptive quarantine measures at the level of small geographical subdivisions (U.S. counties). The cost of a preemptive quarantine in a given county is weighed against the protective benefit of delaying the spread of an outbreak to other neighboring counties. We demonstrate the approach with a decision support model that estimates the suitability of preemptive quarantine across multiple counties that surround areas infested with the emerald ash borer (Agrilus planipennis Fairmaire (EAB), Coleoptera: Buprestidae), an emerging major threat to ash tree species (Fraxinus spp.) in North America. The model identifies the U.S. counties where the installation of preemptive quarantine would most effectively slow the spread of EAB populations and reduce risk to high-value areas. Copyright © 2014 Elsevier Ltd. All rights reserved.
Kiliçkan, L; Toker, K
2000-09-01
The purpose of this study was to evaluate the effect of pre-emptive intravenous versus pre-emptive epidural morphine on both postoperative analgesic consumption and surgical stress response. Sixty patients, ASA I or II, aged 18-85, undergoing total hip or knee replacement were randomly assigned to three groups of 20 patients. In group pre-emptive epidural, patients were administered an epidural injection of 75 micrograms.kg-1 morphine about 45 minute before dermal incision. In group pre-emptive intravenous, patients were administered 0.15 mg.kg-1 of intravenous morphine following induction before dermal incision. In group control, patients were administered intravenous saline following induction before dermal incision. The pre-i.v. group used significantly less morphine than the pre-epi group (p < 0.0003). In all groups, plasma cortisol levels increased as compared to pre-op values, but plasma cortisol increased more significantly in the pre-i.v. and control groups within 4 hrs of surgery and was still significantly elevated at 7 am of the first postoperative morning compared to the pre-epi group (p < 0.001) and the increase persisted to the next morning in patients pre-i.v. and control groups. Although pre-emptive epidural morphine has failed to decrease postoperative analgesic consumption, it has been able to suppress the surgical stress more significantly than intravenous morphine and a saline control.
Jianda, Xu; Yuxing, Qu; Yi, Gao; Hong, Zhao; Libo, Peng; Jianning, Zhao
2016-08-31
The aim of this study was to investigate the effects of preemptive analgesia on the inflammatory response and rehabilitation in TKA. 75 patients with unilateral primary knee osteoarthritis were conducted in this prospective study. All patients were randomly divided into two groups (MMA with/without preemptive analgesia group). The following parameters were used to evaluate analgesic efficacy: knee flexion, pain at rest and walking, functional walking capacity (2 MWT and 6 MWT), WOMAC score, and hs-CRP level. Patients in MMA with preemptive analgesia group had lower hs-CRP level and less pain at rest and walking during the first week postoperatively (P < 0.05). The 2 MWT was significantly better in MMA with preemptive analgesia group (17.13 ± 3.82 VS 14.19 ± 3.56, P = 0.001). The 6 MWT scores and WOMAC scores increased significantly within Groups (P = 0.020, 0.000), but no difference between groups postoperatively (P > 0.05). Less cumulative consumption of morphine was found in MMA with preemptive analgesia group at 48 h (P = 0.017, 0.023), but no difference at total requirement (P = 0.113). Preemptive analgesia added to a multimodal analgesic regime improved analgesia, reduced inflammatory reaction and accelerated functional recovery at the first week postoperatively, but not improved long-term function.
Performance comparison of token ring protocols for hard-real-time communication
NASA Technical Reports Server (NTRS)
Kamat, Sanjay; Zhao, Wei
1992-01-01
The ability to guarantee the deadlines of synchronous messages while maintaining a good aggregate throughput is an important consideration in the design of distributed real-time systems. In this paper, we study two token ring protocols, the priority driven protocol and the timed token protocol, for their suitability for hard real-time systems. Both these protocols use a token to control access to the transmission medium. In a priority driven protocol, messages are assigned priorities and the protocol ensures that messages are transmitted in the order of their priorities. Timed token protocols do not provide for priority arbitration but ensure that the maximum access delay for a station is bounded. For both protocols, we first derive the schedulability conditions under which the transmission deadlines of a given set of synchronous messages can be guaranteed. Subsequently, we use these schedulability conditions to quantitatively compare the average case behavior of the protocols. This comparison demonstrates that each of the protocols has its domain of superior performance and neither dominates the other for the entire range of operating conditions.
Priority scheme planning for the robust SSM/PMAD testbed
NASA Technical Reports Server (NTRS)
Elges, Michael R.; Ashworth, Barry R.
1991-01-01
Whenever mixing priorities of manually controlled resources with those of autonomously controlled resources, the space station module power management and distribution (SSM/PMAD) environment requires cooperating expert system interaction between the planning function and the priority manager. The elements and interactions of the SSM/PMAD planning and priority management functions are presented. Their adherence to cooperating for common achievement are described. In the SSM/PMAD testbed these actions are guided by having a system planning function, KANT, which has insight to the executing system and its automated database. First, the user must be given access to all information which may have an effect on the desired outcome. Second, the fault manager element, FRAMES, must be informed as to the change so that correct diagnoses and operations take place if and when faults occur. Third, some element must engage as mediator for selection of resources and actions to be added or removed at the user's request. This is performed by the priority manager, LPLMS. Lastly, the scheduling mechanism, MAESTRO, must provide future schedules adhering to the user modified resource base.
Shirvani, Armin; Shamszadeh, Sayna; Eghbal, Mohammad Jafar; Marvasti, Laleh Alim; Asgary, Saeed
2017-01-01
The objectives of this study were to assess the efficacy of preemptive oral administration of single dose of non-steroidal anti-inflammatory drugs (NSAIDs) and acetaminophen on the local anesthetic success in adults with irreversible pulpitis and to find the possible covariates that could predict treatment effect. A systematic search using electronic databases up to March 2015 was conducted. Odds ratio (OR) and 95% confidence intervals (CIs) were estimated using random and fixed-effect inverse variance method. Subgroup and meta-regression analyses were conducted to assess the potential source of heterogeneity. Results showed that preemptive analgesics are more effective than placebo in increasing anesthetic success (OR = 0.30, CI% 0.24-0.39, p = 0.000) [Q = 55.860 (p = 0.001)]. In the subgroup analysis, administration of NSAIDs as monotherapy, ibuprofen as mono- vs. combination therapy, oxicam type drugs as monotherapy, and acetaminophen as combination therapy were significantly more effective in increasing anesthetic success OR = 0.25, CI% 0.16-0.38, p = 0.00, Q = 40.539 (p = 0.003); OR = 0.44, CI% 0.26-0.75, p = 0.00, Q = 12.833 (p = 0.011); OR = 0.48, CI% 0.30-0.74, p = 0.002, Q = 15.898 (p = 0.14); OR = 0.30, CI% 0.16-0.38, p = 0.001, Q = 7.506 (p = 0.02); OR = 0.10, CI% 0.16 0.38, p = 0.001, Q = 5.075 (p = 0.07), respectively. However, there was no significant difference in increasing anesthetic success between treatment and placebo arms when acetaminophen was administrated alone. In meta-regression analysis, an association between different types of NSAIDs (indomethacin, diclofenac potassium, and oxicam-type drugs) and articaine with treatment effect was observed. The administration of preemptive analgesics can induce superior intraoperative analgesia for patients with irreversible pulpitis. However, strategies such as co-administration of certain types of analgesics and anesthetic solution might be predictors of treatment effect. Additionally, there was no association between different timing and dosage of analgesics and treatment effect. When compared to placebo, preemptive oral analgesics are superior in achieving anesthetic success in inflamed pulp.
ERIC Educational Resources Information Center
Ta, Wei-Min; Pitts, Raymond C.; Hughes, Christine E.; McLean, Anthony P.; Grace, Randolph C.
2008-01-01
The purpose of this study was to examine effects of "d"-amphetamine on choice controlled by reinforcement delay. Eight pigeons responded under a concurrent-chains procedure in which one terminal-link schedule was always fixed- interval 8 s, and the other terminal-link schedule changed from session to session between fixed-interval 4 s and…
43 CFR 3000.12 - What is the fee schedule for fixed fees?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What is the fee schedule for fixed fees... publication of a final rule in the Federal Register and will subsequently be posted on the BLM Web site (http... of lands 105 plus per acre nomination fee 0.11 Site license application 55 Assignment or transfer of...
Willoughby, Laura; Adams, Daniel M; Evans, R Scott; Lloyd, James F; Stevens, Scott M; Woller, Scott C; Bledsoe, Joseph R; Aston, Valerie T; Wilson, Emily L; Elliott, C Gregory
2018-05-01
Guidelines suggest anticoagulation of patients with high pretest probability of pulmonary embolism (PE) while awaiting diagnostic test results (preemptive anticoagulation). Data relevant to the practice of preemptive anticoagulation are not available. We reviewed 3,500 consecutive patients who underwent CT pulmonary angiography (CTPA) at two EDs. We classified the pretest probability for PE using the revised Geneva Score (RGS) as low (RGS 0-3), intermediate (RGS 4-10), or high (RGS 11-18). We classified patients with a high pretest probability of PE as receiving preemptive anticoagulation if therapeutic anticoagulation was given before CTPA completion. Patients with a high bleeding risk and those receiving treatment for DVT before CTPA were excluded from the preemptive anticoagulation analysis. We compared the time elapsed between ED registration and CTPA completion for patients with a low, intermediate, and high pretest probability for PE. We excluded three of 3,500 patients because CTPA preceded ED registration. Of the remaining 3,497 patients, 167 (4.8%) had a high pretest probability for PE. After excluding 29 patients for high bleeding risk and 21 patients who were treated for DVT prior to CTPA, only two of 117 patients (1.7%) with a high pretest probability for PE received preemptive anticoagulation. Furthermore, 37 of the remaining 115 patients (32%) with a high pretest probability for PE had a preexisting indication for anticoagulation but did not receive preemptive anticoagulation. The time from ED registration to CTPA completion did not differ based on the pretest probability of PE. Physicians rarely use preemptive anticoagulation in patients with a high pretest probability for PE. Clinicians do not expedite CTPA examinations for patients with a high pretest probability for PE. Copyright © 2017 American College of Chest Physicians. Published by Elsevier Inc. All rights reserved.
Francis, Anna; Didsbury, Madeleine; Lim, Wai H; Kim, Siah; White, Sarah; Craig, Jonathan C; Wong, Germaine
2016-06-01
Low socioeconomic status (SES) and geographic disparity have been associated with worse outcomes and poorer access to pre-emptive transplantation in the adult end-stage kidney disease (ESKD) population, but little is known about their impact in children with ESKD. The aim of our study was to determine whether access to pre-emptive transplantation and transplant outcomes differ according to SES and geographic remoteness in Australia. Using data from the Australia and New Zealand Dialysis and Transplant Registry (1993-2012), we compared access to pre-emptive transplantation, the risk of acute rejection and graft failure, based on SES and geographic remoteness among Australian children with ESKD (≤ 18 years), using adjusted logistic and Cox proportional hazard modelling. Of the 768 children who commenced renal replacement therapy, 389 (50.5%) received living donor kidney transplants and 28.5% of these (111/389) were pre-emptive. There was no significant association between SES quintiles and access to pre-emptive transplantation, acute rejection or allograft failure. Children residing in regional or remote areas were 35% less likely to receive a pre-emptive transplant compared to those living in major cities [adjusted odds ratio (OR) 0.65, 95% confidence interval (CI) 0.45-1.0]. There was no significant association between geographic disparity and acute rejection (adjusted OR 1.03, 95% CI 0.68-1.57) or graft loss (adjusted hazard ratio 1.05, 95% CI 0.74-1.41). In Australia, children from regional or remote regions are much less likely to receive pre-emptive kidney transplantation. Strategies such as improved access to nephrology services through expanding the scope of outreach clinics, and support for regional paediatricians to promote early referral may ameliorate this inequity.
Method and apparatus for granting processors access to a resource
Blumrich, Matthias A.; Salapura, Valentina
2010-03-16
An apparatus and method for granting one or more requesting entities access to a resource in a predetermined time interval. The apparatus includes a first circuit receiving one or more request signals, and implementing logic for assigning a priority to the one or more request signals, and, generating a set of first_request signals based on the priorities assigned. One or more priority select circuits for receiving the set of first_request signals and generating corresponding one or more fixed grant signals representing one or more highest priority request signals when asserted during the predetermined time interval. A second circuit device receives the one or more fixed grant signals generates one or more grant signals associated with one or more highest priority request signals assigned, the grant signals for enabling one or more respective requesting entities access to the resource in the predetermined time interval, wherein the priority assigned to the one or more request signals changes each successive predetermined time interval. In one embodiment, the assigned priority is based on a numerical pattern, the first circuit changing the numerical pattern with respect to the first_request signals generated at each successive predetermined time interval.
PWFQ: a priority-based weighted fair queueing algorithm for the downstream transmission of EPON
NASA Astrophysics Data System (ADS)
Xu, Sunjuan; Ye, Jiajun; Zou, Junni
2005-11-01
In the downstream direction of EPON, all ethernet frames share one downlink channel from the OLT to destination ONUs. To guarantee differentiated services, a scheduling algorithm is needed to solve the link-sharing issue. In this paper, we first review the classical WFQ algorithm and point out the shortcomings existing in the fair queueing principle of WFQ algorithm for EPON. Then we propose a novel scheduling algorithm called Priority-based WFQ (PWFQ) algorithm which distributes bandwidth based on priority. PWFQ algorithm can guarantee the quality of real-time services whether under light load or under heavy load. Simulation results also show that PWFQ algorithm not only can improve delay performance of real-time services, but can also meet the worst-case delay bound requirements.
Range and mission scheduling automation using combined AI and operations research techniques
NASA Technical Reports Server (NTRS)
Arbabi, Mansur; Pfeifer, Michael
1987-01-01
Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.
Tugay, Nazan; Saricaoglu, Fatma; Satilmis, Tulin; Alpar, Ulku; Akarcali, Inci; Citaker, Seyit; Tugay, Umut; Atilla, Bulent; Tokgozoglu, Mazhar
2006-07-01
To investigate the efficacy of single injection femoral nerve block (FNB) on the independence level in functional activities in the early postoperative period in patients with total knee arthroplasty (TKA). We conducted this prospective, randomized, blinded trial in the Department of Orthopedics and Traumatology, Hacettepe University Hospital Ankara, Turkey, between June 2003 and April 2004. Twenty-three patients scheduled for elective TKA were randomly divided into 3 groups. Group I received preemptive single injection FNB, group II received postoperative single injection FNB, and group III served as a control group. Intravenous morphine patient controlled analgesia (PCA) was used following surgery in all groups. Morphine dose and pain score defined by the visual analog scale (VAS) were recorded postoperatively at the 15th minute, 30th minute, 1st, 4th, 6th, 12th, 24th, and 48th hours. A standard rehabilitation protocol was applied for all patients. The independence level in functional activities was assessed during the first 2 postoperative days and at discharge with the Iowa Level of Assistance Scale (ILAS) and the Iowa Ambulation Speed Scale (IASS). Physical therapists that enrolled in the study were blinded to the groups. Pain scores were significantly different between the groups (p<0.05). The preemptive and postoperative FNB group`s VAS scores were both significantly lower than the control group (p<0.05). However, there was no significant difference in VAS scores between preemptive and postoperative FNB groups (p>0.05). There was no statistically significant difference between the groups in any of the functional scores in the first 2 postoperative days, and at discharge (p>0.05). Single injection FNB provided effective analgesia in patients undergoing TKA. However, the independence level in functional activities in the early postoperative period was not influenced by the analgesia method.
Smart sensing to drive real-time loads scheduling algorithm in a domotic architecture
NASA Astrophysics Data System (ADS)
Santamaria, Amilcare Francesco; Raimondo, Pierfrancesco; De Rango, Floriano; Vaccaro, Andrea
2014-05-01
Nowadays the focus on power consumption represent a very important factor regarding the reduction of power consumption with correlated costs and the environmental sustainability problems. Automatic control load based on power consumption and use cycle represents the optimal solution to costs restraint. The purpose of these systems is to modulate the power request of electricity avoiding an unorganized work of the loads, using intelligent techniques to manage them based on real time scheduling algorithms. The goal is to coordinate a set of electrical loads to optimize energy costs and consumptions based on the stipulated contract terms. The proposed algorithm use two new main notions: priority driven loads and smart scheduling loads. The priority driven loads can be turned off (stand by) according to a priority policy established by the user if the consumption exceed a defined threshold, on the contrary smart scheduling loads are scheduled in a particular way to don't stop their Life Cycle (LC) safeguarding the devices functions or allowing the user to freely use the devices without the risk of exceeding the power threshold. The algorithm, using these two kind of notions and taking into account user requirements, manages loads activation and deactivation allowing the completion their operation cycle without exceeding the consumption threshold in an off-peak time range according to the electricity fare. This kind of logic is inspired by industrial lean manufacturing which focus is to minimize any kind of power waste optimizing the available resources.
Vehicle Scheduling Schemes for Commercial and Emergency Logistics Integration
Li, Xiaohui; Tan, Qingmei
2013-01-01
In modern logistics operations, large-scale logistics companies, besides active participation in profit-seeking commercial business, also play an essential role during an emergency relief process by dispatching urgently-required materials to disaster-affected areas. Therefore, an issue has been widely addressed by logistics practitioners and caught researchers' more attention as to how the logistics companies achieve maximum commercial profit on condition that emergency tasks are effectively and performed satisfactorily. In this paper, two vehicle scheduling models are proposed to solve the problem. One is a prediction-related scheme, which predicts the amounts of disaster-relief materials and commercial business and then accepts the business that will generate maximum profits; the other is a priority-directed scheme, which, firstly groups commercial and emergency business according to priority grades and then schedules both types of business jointly and simultaneously by arriving at the maximum priority in total. Moreover, computer-based simulations are carried out to evaluate the performance of these two models by comparing them with two traditional disaster-relief tactics in China. The results testify the feasibility and effectiveness of the proposed models. PMID:24391724
Vehicle scheduling schemes for commercial and emergency logistics integration.
Li, Xiaohui; Tan, Qingmei
2013-01-01
In modern logistics operations, large-scale logistics companies, besides active participation in profit-seeking commercial business, also play an essential role during an emergency relief process by dispatching urgently-required materials to disaster-affected areas. Therefore, an issue has been widely addressed by logistics practitioners and caught researchers' more attention as to how the logistics companies achieve maximum commercial profit on condition that emergency tasks are effectively and performed satisfactorily. In this paper, two vehicle scheduling models are proposed to solve the problem. One is a prediction-related scheme, which predicts the amounts of disaster-relief materials and commercial business and then accepts the business that will generate maximum profits; the other is a priority-directed scheme, which, firstly groups commercial and emergency business according to priority grades and then schedules both types of business jointly and simultaneously by arriving at the maximum priority in total. Moreover, computer-based simulations are carried out to evaluate the performance of these two models by comparing them with two traditional disaster-relief tactics in China. The results testify the feasibility and effectiveness of the proposed models.
Sharkey, Katherine M.; Carskadon, Mary A.; Figueiro, Mariana G.; Zhu, Yong; Rea, Mark S.
2011-01-01
Objective We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD = 21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase syndrome (DSPD). Methods After a baseline week, participants kept individualized, fixed, advanced 7.5-hour sleep schedules for 6 days. Participants were randomly assigned to groups to receive “blue” (470 nm, ~225 lux, n=12) or “dim” (< 1 lux, n=13) light for one hour after waking each day. Head-worn “Daysimeters” measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. Results After 6 days, both groups showed significant circadian phase advances, but morning blue-light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1 hours in the dim light group and 1.4±0.7 hours in the blue light group. Conclusions Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. PMID:21704557
Sharkey, Katherine M; Carskadon, Mary A; Figueiro, Mariana G; Zhu, Yong; Rea, Mark S
2011-08-01
We examined the effects of an advanced sleep/wake schedule and morning short wavelength (blue) light in 25 adults (mean age±SD=21.8±3 years; 13 women) with late sleep schedules and subclinical features of delayed sleep phase disorder (DSPD). After a baseline week, participants kept individualized, fixed, advanced 7.5-h sleep schedules for 6days. Participants were randomly assigned to groups to receive "blue" (470nm, ∼225lux, n=12) or "dim" (<1lux, n=13) light for 1h after waking each day. Head-worn "Daysimeters" measured light exposure; actigraphs and sleep diaries confirmed schedule compliance. Salivary dim light melatonin onset (DLMO), self-reported sleep, and mood were examined with 2×2 ANOVA. After 6days, both groups showed significant circadian phase advances, but morning blue light was not associated with larger phase shifts than dim-light exposure. The average DLMO advances (mean±SD) were 1.5±1.1h in the dim light group and 1.4±0.7h in the blue light group. Adherence to a fixed advanced sleep/wake schedule resulted in significant circadian phase shifts in young adults with subclinical DSPD with or without morning blue light exposure. Light/dark exposures associated with fixed early sleep schedules are sufficient to advance circadian phase in young adults. Copyright © 2011 Elsevier B.V. All rights reserved.
Li, Shanlin; Li, Maoqin
2015-01-01
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time.
Li, Shanlin; Li, Maoqin
2015-01-01
We consider an integrated production and distribution scheduling problem faced by a typical make-to-order manufacturer which relies on a third-party logistics (3PL) provider for finished product delivery to customers. In the beginning of a planning horizon, the manufacturer has received a set of orders to be processed on a single production line. Completed orders are delivered to customers by a finite number of vehicles provided by the 3PL company which follows a fixed daily or weekly shipping schedule such that the vehicles have fixed departure dates which are not part of the decisions. The problem is to find a feasible schedule that minimizes one of the following objective functions when processing times and weights are oppositely ordered: (1) the total weight of late orders and (2) the number of vehicles used subject to the condition that the total weight of late orders is minimum. We show that both problems are solvable in polynomial time. PMID:25785285
CaLRS: A Critical-Aware Shared LLC Request Scheduling Algorithm on GPGPU
Ma, Jianliang; Meng, Jinglei; Chen, Tianzhou; Wu, Minghui
2015-01-01
Ultra high thread-level parallelism in modern GPUs usually introduces numerous memory requests simultaneously. So there are always plenty of memory requests waiting at each bank of the shared LLC (L2 in this paper) and global memory. For global memory, various schedulers have already been developed to adjust the request sequence. But we find few work has ever focused on the service sequence on the shared LLC. We measured that a big number of GPU applications always queue at LLC bank for services, which provide opportunity to optimize the service order on LLC. Through adjusting the GPU memory request service order, we can improve the schedulability of SM. So we proposed a critical-aware shared LLC request scheduling algorithm (CaLRS) in this paper. The priority representative of memory request is critical for CaLRS. We use the number of memory requests that originate from the same warp but have not been serviced when they arrive at the shared LLC bank to represent the criticality of each warp. Experiments show that the proposed scheme can boost the SM schedulability effectively by promoting the scheduling priority of the memory requests with high criticality and improves the performance of GPU indirectly. PMID:25729772
Distributed Decision Making in a Dynamic Network Environment
1990-01-01
protocols, particularly when traffic arrival statistics are varying or unknown, and loads are high. Both nonpreemptive and preemptive repeat disciplines are...The simulation model allows general value functions, continuous time operation, and preemptive or nonpreemptive service. For reasons of tractability... nonpreemptive LIFO, (4) nonpreemptive LIFO with discarding, (5) nonpreemptive HOL, (6) nonpreemp- tive HOL with discarding, (7) preemptive repeat HOL, (8
Jing, Yiming; Gries, Peter H.; Li, Yang; Stivers, Adam W.; Mifune, Nobuhiro; Kuhlman, D. M.; Bai, Liying
2017-01-01
Why do great powers with benign intentions end up fighting each other in wars they do not seek? We utilize an incentivized, two-person “Preemptive Strike Game” (PSG) to explore how the subjective perception of great power interdependence shapes defensive aggression against persons from rival great powers. In Study 1, college students from the United States (N = 115), China (N = 106), and Japan (N = 99) made PSG decisions facing each other. This natural experiment revealed that Chinese and Japanese participants (a) made more preemptive attacks against each other and Americans than against their compatriots, and that (b) greater preexisting perceptions of bilateral competition increased intergroup attack rates. In Study 2, adult Americans (N = 127) watched real CNN expert interviews portraying United States–China economic interdependence as more positive or negative. This randomized experiment revealed that the more positive portrayal reduced preemptive American strikes against Chinese (but not Japanese), while the more negative portrayal amplified American anger about China’s rise, increasing preemptive attacks against Chinese. We also found, however, that preemptive strikes were primarily defensive and not offensive. Interventions to reduce defensive aggression and promote great power peace are discussed. PMID:28626433
Jing, Yiming; Gries, Peter H; Li, Yang; Stivers, Adam W; Mifune, Nobuhiro; Kuhlman, D M; Bai, Liying
2017-01-01
Why do great powers with benign intentions end up fighting each other in wars they do not seek? We utilize an incentivized, two-person "Preemptive Strike Game" (PSG) to explore how the subjective perception of great power interdependence shapes defensive aggression against persons from rival great powers. In Study 1, college students from the United States ( N = 115), China ( N = 106), and Japan ( N = 99) made PSG decisions facing each other. This natural experiment revealed that Chinese and Japanese participants (a) made more preemptive attacks against each other and Americans than against their compatriots, and that (b) greater preexisting perceptions of bilateral competition increased intergroup attack rates. In Study 2, adult Americans ( N = 127) watched real CNN expert interviews portraying United States-China economic interdependence as more positive or negative. This randomized experiment revealed that the more positive portrayal reduced preemptive American strikes against Chinese (but not Japanese), while the more negative portrayal amplified American anger about China's rise, increasing preemptive attacks against Chinese. We also found, however, that preemptive strikes were primarily defensive and not offensive. Interventions to reduce defensive aggression and promote great power peace are discussed.
Kong, Yonggang; Yang, Xilin
2014-09-01
To evaluate the preemptive analgesia effects of both the parecoxib sodium and the pentazocine in patients undergoing nasal endoscopic surgery. In the randomized, double blind, controlled study, 120 patients undergoing septoplasty were divided into 3 groups (n = 40): group A received parecoxib 40 mg by muscle injection 30 min before the operation; group B received pentazocine 30 mg; group C received an equal volume of saline. The preemptive analgesia effect was evaluated with VAS scores which recorded at different time points. The proportion of participants using rescue analgesia after the operation were recorded as additional measures of preemptive analgesia. Intra-operative as well as the postoperative pain scores were less in the group A and group B than in the control group. Fewer participants required rescue medication after operation with parecoxib as well as pentazocine than placebo. However there were no difference in the preemptive effects between the group A and group B. Administration of both the parecoxib and pentazocine before the nasal endoscopic surgery can provide preemptive analgesia without serious adverse side effects that deserves popularization in the clinic.
User modeling techniques for enhanced usability of OPSMODEL operations simulation software
NASA Technical Reports Server (NTRS)
Davis, William T.
1991-01-01
The PC based OPSMODEL operations software for modeling and simulation of space station crew activities supports engineering and cost analyses and operations planning. Using top-down modeling, the level of detail required in the data base can be limited to being commensurate with the results required of any particular analysis. To perform a simulation, a resource environment consisting of locations, crew definition, equipment, and consumables is first defined. Activities to be simulated are then defined as operations and scheduled as desired. These operations are defined within a 1000 level priority structure. The simulation on OPSMODEL, then, consists of the following: user defined, user scheduled operations executing within an environment of user defined resource and priority constraints. Techniques for prioritizing operations to realistically model a representative daily scenario of on-orbit space station crew activities are discussed. The large number of priority levels allows priorities to be assigned commensurate with the detail necessary for a given simulation. Several techniques for realistic modeling of day-to-day work carryover are also addressed.
Jianda, Xu; Yuxing, Qu; Yi, Gao; Hong, Zhao; Libo, Peng; Jianning, Zhao
2016-01-01
The aim of this study was to investigate the effects of preemptive analgesia on the inflammatory response and rehabilitation in TKA. 75 patients with unilateral primary knee osteoarthritis were conducted in this prospective study. All patients were randomly divided into two groups (MMA with/without preemptive analgesia group). The following parameters were used to evaluate analgesic efficacy: knee flexion, pain at rest and walking, functional walking capacity (2 MWT and 6 MWT), WOMAC score, and hs-CRP level. Patients in MMA with preemptive analgesia group had lower hs-CRP level and less pain at rest and walking during the first week postoperatively (P < 0.05). The 2 MWT was significantly better in MMA with preemptive analgesia group (17.13 ± 3.82 VS 14.19 ± 3.56, P = 0.001). The 6 MWT scores and WOMAC scores increased significantly within Groups (P = 0.020, 0.000), but no difference between groups postoperatively (P > 0.05). Less cumulative consumption of morphine was found in MMA with preemptive analgesia group at 48 h (P = 0.017, 0.023), but no difference at total requirement (P = 0.113). Preemptive analgesia added to a multimodal analgesic regime improved analgesia, reduced inflammatory reaction and accelerated functional recovery at the first week postoperatively, but not improved long-term function. PMID:27578313
76 FR 46856 - Mail Classification Schedule Change
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... POSTAL REGULATORY COMMISSION [Docket No. MC2011-26; Order No. 777] Mail Classification Schedule... recently-filed Postal Service request regarding classification changes to Priority Mail packaging. This...). SUPPLEMENTARY INFORMATION: On July 26, 2011, the Postal Service filed a notice of two classification changes...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hall, David R; Bartholomew, David B; Moon, Justin
2009-09-08
An apparatus for fixing computational latency within a deterministic region on a network comprises a network interface modem, a high priority module and at least one deterministic peripheral device. The network interface modem is in communication with the network. The high priority module is in communication with the network interface modem. The at least one deterministic peripheral device is connected to the high priority module. The high priority module comprises a packet assembler/disassembler, and hardware for performing at least one operation. Also disclosed is an apparatus for executing at least one instruction on a downhole device within a deterministic region,more » the apparatus comprising a control device, a downhole network, and a downhole device. The control device is near the surface of a downhole tool string. The downhole network is integrated into the tool string. The downhole device is in communication with the downhole network.« less
Web server for priority ordered multimedia services
NASA Astrophysics Data System (ADS)
Celenk, Mehmet; Godavari, Rakesh K.; Vetnes, Vermund
2001-10-01
In this work, our aim is to provide finer priority levels in the design of a general-purpose Web multimedia server with provisions of the CM services. The type of services provided include reading/writing a web page, downloading/uploading an audio/video stream, navigating the Web through browsing, and interactive video teleconferencing. The selected priority encoding levels for such operations follow the order of admin read/write, hot page CM and Web multicasting, CM read, Web read, CM write and Web write. Hot pages are the most requested CM streams (e.g., the newest movies, video clips, and HDTV channels) and Web pages (e.g., portal pages of the commercial Internet search engines). Maintaining a list of these hot Web pages and CM streams in a content addressable buffer enables a server to multicast hot streams with lower latency and higher system throughput. Cold Web pages and CM streams are treated as regular Web and CM requests. Interactive CM operations such as pause (P), resume (R), fast-forward (FF), and rewind (RW) have to be executed without allocation of extra resources. The proposed multimedia server model is a part of the distributed network with load balancing schedulers. The SM is connected to an integrated disk scheduler (IDS), which supervises an allocated disk manager. The IDS follows the same priority handling as the SM, and implements a SCAN disk-scheduling method for an improved disk access and a higher throughput. Different disks are used for the Web and CM services in order to meet the QoS requirements of CM services. The IDS ouput is forwarded to an Integrated Transmission Scheduler (ITS). The ITS creates a priority ordered buffering of the retrieved Web pages and CM data streams that are fed into an auto regressive moving average (ARMA) based traffic shaping circuitry before being transmitted through the network.
The Impact of Planned Preemptive Focus on Form on Iranian EFL Learners' Essay Writing Ability
ERIC Educational Resources Information Center
Gholami, Javad; Aliyari, Somayeh
2015-01-01
Focus on Form (FonF) instruction places dual emphasis on meaningful interaction and overt reference to problematic or more complex forms in L2 classes. One way to draw attention to such forms is through incidental preemptive FonF. As an attempt to expand the scope of teacher-initiated preemptive FonF, the present quasi-experimental study explored…
Cohen, S L; Richardson, J; Klebez, J; Febbo, S; Tucker, D
2001-09-01
Biofeedback was used to increase forearm-muscle tension. Feedback was delivered under continuous reinforcement (CRF), variable interval (VI), fixed interval (FI), variable ratio (VR), and fixed ratio (FR) schedules of reinforcement when college students increased their muscle tension (electromyograph, EMG) above a high threshold. There were three daily sessions of feedback, and Session 3 was immediately followed by a session without feedback (extinction). The CRF schedule resulted in the highest EMG, closely followed by the FR and VR schedules, and the lowest EMG scores were produced by the FI and VI schedules. Similarly, the CRF schedule resulted in the greatest amount of time-above-threshold and the VI and FI schedules produced the lowest time-above-threshold. The highest response rates were generated by the FR schedule, followed by the VR schedule. The CRF schedule produced relatively low response rates, comparable to the rates under the VI and FI schedules. Some of the data are consistent with the partial-reinforcement-extinction effect. The present data suggest that different schedules of feedback should be considered in muscle-strengthening-contexts such as during the rehabilitation of muscles following brain damage or peripheral nervous-system injury.
Stubbs, D A; Cohen, S L
1972-11-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules.
Stubbs, D. Alan; Cohen, Steven L.
1972-01-01
Pigeons performed on a second-order schedule in which fixed-interval components were maintained under a variable-interval schedule. Completion of each fixed-interval component resulted in a brief-stimulus presentation and/or food. The relation of the brief stimulus and food was varied across conditions. Under some conditions, the brief stimulus was never paired with food. Under other conditions, the brief stimulus was paired with food; three different pairing procedures were used: (a) a response produced the simultaneous onset of the stimulus and food; (b) a response produced the stimulus before food with the stimulus remaining on during food presentation; (c) a response produced the stimulus and the offset of the stimulus was simultaneous with the onset of the food cycle. The various pairing and nonpairing operations all produced similar effects on performance. Under all conditions, response rates were positively accelerated within fixed-interval components. Total response rates and Index of Curvature measures were similar across conditions. In one condition, a blackout was paired with food; with this different stimulus in effect, less curvature resulted. The results suggest that pairing of a stimulus is not a necessary condition for within-component patterning under some second-order schedules. PMID:16811634
Alternative Work Schedules in Office and Nonoffice Work Settings.
ERIC Educational Resources Information Center
Kirk, Raymond J.; Barton, H. David
A rapidly growing change in the workplace is the replacement of a fixed work schedule with a variety of alternative work schedules (AWS), including both flexible and compressed schedules. Experimenting organizations (N=901) evaluated one of four major categories of AWS in office and nonoffice settings, i.e., a flexible 8-hour day;…
Systemic Sustainability in RtI Using Intervention-Based Scheduling Methodologies
ERIC Educational Resources Information Center
Dallas, William P.
2017-01-01
This study evaluated a scheduling methodology referred to as intervention-based scheduling to address the problem of practice regarding the fidelity of implementing Response to Intervention (RtI) in an existing school schedule design. Employing panel data, this study used fixed-effects regressions and first differences ordinary least squares (OLS)…
Charles, Pierre; Terrier, Benjamin; Perrodeau, Élodie; Cohen, Pascal; Faguer, Stanislas; Huart, Antoine; Hamidou, Mohamed; Agard, Christian; Bonnotte, Bernard; Samson, Maxime; Karras, Alexandre; Jourde-Chiche, Noémie; Lifermann, François; Gobert, Pierre; Hanrotel-Saliou, Catherine; Godmer, Pascal; Martin-Silva, Nicolas; Pugnet, Grégory; Matignon, Marie; Aumaitre, Olivier; Viallard, Jean-François; Maurier, François; Meaux-Ruault, Nadine; Rivière, Sophie; Sibilia, Jean; Puéchal, Xavier; Ravaud, Philippe; Mouthon, Luc; Guillevin, Loïc
2018-04-25
To compare individually tailored, based on trimestrial biological parameter monitoring, to fixed-schedule rituximab reinfusion for remission maintenance of antineutrophil cytoplasm antibody (ANCA)-associated vasculitides (AAVs). Patients with newly diagnosed or relapsing granulomatosis with polyangiitis (GPA) or microscopic polyangiitis (MPA) in complete remission after induction therapy were included in an open-label, multicentre, randomised controlled trial. All tailored-arm patients received a 500 mg rituximab infusion at randomisation, with rituximab reinfusion only when CD19+B lymphocytes or ANCA had reappeared or ANCA titre rose markedly based on trimestrial testing until month 18. Controls received a fixed 500 mg rituximab infusion on days 0 and 14 postrandomisation, then 6, 12 and 18 months after the first infusion. The primary endpoint was the number of relapses (new or reappearing symptom(s) or worsening disease with Birmingham Vasculitis Activity Score (BVAS)>0) at month 28 evaluated by an independent Adjudication Committee blinded to treatment group. Among the 162 patients (mean age: 60 years; 42% women) included, 117 (72.2%) had GPA and 45 (27.8%) had MPA. Preinclusion induction therapy included cyclophosphamide for 100 (61.7%), rituximab for 61 (37.6%) and methotrexate for 1 (0.6%). At month 28, 21 patients had suffered 22 relapses: 14/81 (17.3%) in 13 tailored-infusion recipients and 8/81 (9.9%) in 8 fixed-schedule patients (p=0.22). The tailored-infusion versus fixed-schedule group, respectively, received 248 vs 381 infusions, with medians (IQR) of 3 (2-4) vs 5 (5-5) administrations. AAV relapse rates did not differ significantly between individually tailored and fixed-schedule rituximab regimens. Individually tailored-arm patients received fewer rituximab infusions. NCT01731561; Results. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.
An approach to rescheduling activities based on determination of priority and disruptivity
NASA Technical Reports Server (NTRS)
Sponsler, Jeffrey L.; Johnston, Mark D.
1990-01-01
A constraint-based scheduling system called SPIKE is being used to create long term schedules for the Hubble Space Telescope. Feedback for the spacecraft or from other ground support systems may invalidate some scheduling decisions and those activities concerned must be reconsidered. A function rescheduling priority is defined which for a given activity performs a heuristic analysis and produces a relative numerical value which is used to rank all such entities in the order that they should be rescheduled. A function disruptivity is also defined that is used to place a relative numeric value on how much a pre-existing schedule would be changed in order to reschedule an activity. Using these functions, two algorithms (a stochastic neural network approach and an exhaustive search approach) are proposed to find the best place to reschedule an activity. Prototypes were implemented and preliminary testing reveals that the exhaustive technique produces only marginally better results at much greater computational cost.
The effects of morphine on fixed-interval patterning and temporal discrimination.
Odum, A L; Schaal, D W
2000-01-01
Changes produced by drugs in response patterns under fixed-interval schedules of reinforcement have been interpreted to result from changes in temporal discrimination. To examine this possibility, this experiment determined the effects of morphine on the response patterning of 4 pigeons during a fixed-interval 1-min schedule of food delivery with interpolated temporal discrimination trials. Twenty of the 50 total intervals were interrupted by choice trials. Pecks to one key color produced food if the interval was interrupted after a short time (after 2 or 4.64 s). Pecks to another key color produced food if the interval was interrupted after a long time (after 24.99 or 58 s). Morphine (1.0 to 10.0 mg/kg) decreased the index of curvature (a measure of response patterning) during fixed intervals and accuracy during temporal discrimination trials. Accuracy was equally disrupted following short and long sample durations. Although morphine disrupted temporal discrimination in the context of a fixed-interval schedule, these effects are inconsistent with interpretations of the disruption of response patterning as a selective overestimation of elapsed time. The effects of morphine may be related to the effects of more conventional external stimuli on response patterning. PMID:11029024
McGrath, Eric; Du, Wei; Rajpurkar, Madhvi
2018-03-01
Ethanol lock therapy (ELT) with systemic antimicrobial therapy is a promising therapy for catheter-related infection (CRI). The impact of ELT timing on treatment efficacy and costs is unknown. A prospective study was conducted in the Hematology/Oncology Unit at the Children's Hospital of Michigan. Patients with suspected CRI were randomized to Preemptive ELT arm or Rescue ELT arm after positive culture. Five cases in Preemptive arm and 9 in Rescue arm had a confirmed CRI. All cases cleared infection with line salvage with no adverse events due to ELT or recurrence within 14 days. Our data showed a trend toward 36% reduction in average hospital costs and 40% reduction in average length of stay in Preemptive arm over Rescue arm. Although a small study, our data on preemptive ELT with systemic antimicrobial therapy suggest a potentially important treatment strategy in reducing length of stay as well as hospital costs.
Brasil, I R C; Custodio-Lima, J; Sampaio, R L; Pierre, A M M; Esmeraldo, T M; Lima, R V C; Lima, L F A; Esmeraldo, R M
2017-05-01
Infection by cytomegalovirus (CMV) is a major cause of morbidity among immunosuppressed patients, especially after solid organ transplantation. The risk of CMV after organ transplantation is strongly related to the serology of the donor and the recipient. The objective of this study was to analyze the outcomes and costs of pre-emptive therapy in patients after liver transplantation with donor-positive/recipient-negative (D+/R-) serostatus. This retrospective study analyzed all patients who underwent liver transplantation with CMV serostatus D+/R- between January 2012 and December 2015. The service protocol adopts pre-emptive therapy. The outcomes and costs of this therapy are described. Of the 119 patients undergoing liver transplantation, 19 were D+/R- and entered the main analysis. Of these, 7 had positive polymerase chain reaction (PCR) results, and 1 developed CMV disease. Of the 6 patients who received no treatment, none developed CMV disease. Analyzing costs, pre-emptive therapy for these patients generated service savings of R$32,346.00. Although outcomes of universal prophylaxis and pre-emptive therapy are similar, pre-emptive therapy save on costs and have to be considered in patients with high-risk CMV disease after liver transplantation. Copyright © 2017. Published by Elsevier Inc.
Preemptive versus postoperative lumiracoxib for analgesia in ambulatory arthroscopic knee surgery
Grifka, Joachim; Enz, Rudolf; Zink, Joachim; Hugot, Jean Louis; Kreiss, Andreas; Arulmani, Udayasankar; Yu, Vincent; Rebuli, Rosemary; Krammer, Gerhard
2008-01-01
We compared the efficacy and safety of preemptive vs postoperative dosing of lumiracoxib 400 mg in patients undergoing minor ambulatory arthroscopic knee surgery. Eligible patients were randomized to preemptive lumiracoxib, postoperative lumiracoxib, and placebo. The main efficacy parameter was pain intensity (PI) (0–100 mm visual analog scale) in the target knee upon movement, 2 hours after surgery. Other efficacy variables included PI in the target knee at rest and upon movement at 1, 3, 4, and 24 hours, time to first rescue medication intake. In the lumiracoxib preemptive and postoperative groups, the estimated treatment difference compared to placebo for primary endpoint was −4.0 (95% CI: −9, −1; p = 0.007) and −3.5 (95% CI: −8.5, 0; p = 0.052), respectively. There was no statistical significant difference between two active treatment groups (p = 0.602). Both preemptive and postoperative lumiracoxib resulted in significantly lower PI scores at rest and after movement at all time-points and no statistically significant difference was observed between the active treatments. Time to rescue medication intake was comparable for both active treatments. The proportion of adverse events was similar among all groups. We conclude that the efficacy of lumiracoxib 400 mg is not affected by the timing of administration (preemptive or postoperative). PMID:21197285
Hutsell, Blake A.; Newland, M. Christopher
2013-01-01
Previous studies of inbred mouse strains have shown reinforcer-strain interactions that may potentially mask differences among strains in memory performance. The present research examined the effects of two qualitatively different reinforcers (heterogeneous mix of flavored pellets and sweetened-condensed milk) on responding maintained by fixed-ratio schedules of reinforcement in three inbred strains of mice (BALB/c, C57BL/6, & DBA/2). Responses rates for all strains were a bitonic (inverted U) function of the size of the fixed-ratio schedule and were generally higher when responding was maintained by milk. For the DBA/2 and C57BL/6 and to a lesser extent the BALB/c, milk primarily increased response rates at moderate fixed ratios, but not at the largest fixed ratios tested. A formal model of ratio-schedule performance, Mathematical Principles of Reinforcement (MPR), was applied to the response rate functions of individual mice. According to MPR, the differences in response rates maintained by pellets and milk were mostly due to changes in motoric processes as indicated by changes in the minimum response time (δ) produced by each reinforcer type and not specific activation (a), a model term that represents value and is correlated with reinforcer magnitude and the break point obtained under progressive ratio schedules. In addition, MPR also revealed that, although affected by reinforcer type, a parameter interpreted as the rate of saturation of working memory (λ), differed among the strains. PMID:23357283
Choice with a fixed requirement for food, and the generality of the matching relation
Stubbs, D. Alan; Dreyfus, Leon R.; Fetterman, J. Gregor; Dorman, Lana G.
1986-01-01
Pigeons were trained on choice procedures in which responses on each of two keys were reinforced probabilistically, but only after a schedule requirement had been met. Under one arrangement, a fixed-interval choice procedure was used in which responses were not reinforced until the interval was over; then a response on one key would be reinforced, with the effective key changing irregularly from interval to interval. Under a second, fixed-ratio choice procedure, responses on either key counted towards completion of the ratio and then, once the ratio had been completed, a response on the probabilistically selected key would produce food. In one experiment, the schedule requirements were varied for both fixed-interval and fixed-ratio schedules. In the second experiment, relative reinforcement rate was varied. And in a third experiment, the duration of an intertrial interval separating choices was varied. The results for 11 pigeons across all three experiments indicate that there were often large deviations between relative response rates and relative reinforcement rates. Overall performance measures were characterized by a great deal of variability across conditions. More detailed measures of choice across the schedule requirement were also quite variable across conditions. In spite of this variability, performance was consistent across conditions in its efficiency of producing food. The absence of matching of behavior allocation to reinforcement rate indicates an important difference between the present procedures and other choice procedures; that difference raises questions about the specific conditions that lead to matching as an outcome. PMID:16812452
Economic analysis of HPAI control in the Netherlands II: comparison of control strategies.
Longworth, N; Mourits, M C M; Saatkamp, H W
2014-06-01
A combined epidemiological-economic modelling approach was used to analyse strategies for highly pathogenic avian influenza (HPAI) control for the Netherlands. The modelling framework used was InterSpread Plus (ISP), a spatially based, stochastic and dynamic simulation model. A total of eight control strategies were analysed, including pre-emptive depopulation and vaccination strategies. The analysis was carried out for three different regions in the Netherlands: high-, medium- and low-density areas (HDA, MDA and LDA, respectively). The analysis included the veterinary impact (e.g. number of infected premises and duration), but was particularly focused on the impact on direct costs (DC) and direct consequential costs. The efficient set of control strategies for HDA and MDA included strategies based on either pre-emptive depopulation only or combined vaccination and pre-emptive depopulation: D2 (pre-emptive depopulation within a radius of 2 km), RV3 + D1 (ring vaccination within a radius of 3 km and additional pre-emptive depopulation within a radius of 1 km) and PV + D1 (preventive vaccination in non-affected HDAs and pre-emptive depopulation within a radius of 1 km in the affected HDA). Although control solely based on depopulation in most cases showed to be effective for LDA, pre-emptive depopulation showed to have an additional advantage in these areas, that is, prevention of 'virus jumps' to other areas. The pros and cons of the efficient control strategies were discussed, for example, public perception and risk of export restrictions. It was concluded that for the Netherlands control of HPAI preferably should be carried out using strategies including pre-emptive depopulation with or without vaccination. Particularly, the short- and long-term implications on export, that is, indirect consequential costs (ICC) and aftermath costs of these strategies, should be analysed further. © 2012 Blackwell Verlag GmbH.
1998-09-30
The Electrostatic Levitator (ESL) Facility established at Marshall Space Flight Center (MSFC) supports NASA's Microgravity Materials Science Research Program. NASA materials science investigations include ground-based, flight definition and flight projects. Flight definition projects, with demanding science concept review schedules, receive highest priority for scheduling experiment time in the Electrostatic Levitator (ESL) Facility.
14 CFR 1215.109 - Scheduling user service.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Scheduling user service. 1215.109 Section 1215.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION TRACKING AND DATA RELAY... highest priority: (i) Launch, reentry, landing of the STS Shuttle, or other NASA launches. (ii) NASA...
14 CFR 1215.109 - Scheduling user service.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Scheduling user service. 1215.109 Section 1215.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION TRACKING AND DATA RELAY... highest priority: (i) Launch, reentry, landing of the STS Shuttle, or other NASA launches. (ii) NASA...
14 CFR 1215.109 - Scheduling user service.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Scheduling user service. 1215.109 Section 1215.109 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION TRACKING AND DATA RELAY... highest priority: (i) Launch, reentry, landing of the STS Shuttle, or other NASA launches. (ii) NASA...
Lin, Di; Labeau, Fabrice; Yao, Yuanzhe; Vasilakos, Athanasios V; Tang, Yu
2016-07-01
Wireless technologies and vehicle-mounted or wearable medical sensors are pervasive to support ubiquitous healthcare applications. However, a critical issue of using wireless communications under a healthcare scenario rests at the electromagnetic interference (EMI) caused by radio frequency transmission. A high level of EMI may lead to a critical malfunction of medical sensors, and in such a scenario, a few users who are not transmitting emergency data could be required to reduce their transmit power or even temporarily disconnect from the network in order to guarantee the normal operation of medical sensors as well as the transmission of emergency data. In this paper, we propose a joint power and admission control algorithm to schedule the users' transmission of medical data. The objective of this algorithm is to minimize the number of users who are forced to disconnect from the network while keeping the EMI on medical sensors at an acceptable level. We show that a fixed point of proposed algorithm always exists, and at the fixed point, our proposed algorithm can minimize the number of low-priority users who are required to disconnect from the network. Numerical results illustrate that the proposed algorithm can achieve robust performance against the variations of mobile hospital environments.
Resurgence in Siamese fighting fish, Betta splendens.
da Silva, Stephanie P; Cançado, Carlos R X; Lattal, Kennon A
2014-03-01
Resurgence of previously reinforced responding was investigated in male Siamese fighting fish (Betta splendens). Swimming through a ring produced 15-s mirror presentations according to, with different fish, either a fixed-ratio 1 or a variable-interval 60-s schedule of reinforcement. When responding was stable, a differential-reinforcement-of-other-behavior schedule was substituted for the mirror-presentation schedule. Following this, mirror presentations were discontinued (extinction). During this latter phase, there were transient increases in the ring-swim response relative to the frequency of such responding during the differential-reinforcement-of-other behavior schedule. Resurgence was similar for the fish exposed previously to the fixed-ratio or to the variable-interval schedule. These results extend to Siamese fighting fish a well-established behavioral phenomenon previously not observed in this species or with this response topography, and only rarely reported following the removal of a non-consumable reinforcer. Copyright © 2014 Elsevier B.V. All rights reserved.
Williams, Dean C; Saunders, Kathryn J; Perone, Michael
2011-01-01
We conducted three experiments to reproduce and extend Perone and Courtney's (1992) study of pausing at the beginning of fixed-ratio schedules. In a multiple schedule with unequal amounts of food across two components, they found that pigeons paused longest in the component associated with the smaller amount of food (the lean component), but only when it was preceded by the rich component. In our studies, adults with mild intellectual disabilities responded on a touch-sensitive computer monitor to produce money. In Experiment 1, the multiple-schedule components differed in both response requirement and reinforcer magnitude (i.e., the rich component required fewer responses and produced more money than the lean component). Effects shown with pigeons were reproduced in all 7 participants. In Experiment 2, we removed the stimuli that signaled the two schedule components, and participants' extended pausing was eliminated. In Experiment 3, to assess sensitivity to reinforcer magnitude versus fixed-ratio size, we presented conditions with equal ratio sizes but disparate magnitudes and conditions with equal magnitudes but disparate ratio sizes. Sensitivity to these manipulations was idiosyncratic. The present experiments obtained schedule control in verbally competent human participants and, despite procedural differences, we reproduced findings with animal participants. We showed that pausing is jointly determined by past conditions of reinforcement and stimuli correlated with upcoming conditions. PMID:21541121
Fixed-interval performance and self-control in infants.
Darcheville, J C; Rivière, V; Wearden, J H
1993-01-01
Twenty-six infants, 3 to 23 months old, were trained on fixed-interval schedules ranging from 10 s to 80 s. The operant response was touching an illuminated location on a touch-sensitive screen, and 20 s of cartoon presentation was the reinforcer. The subjects were also trained in a six-phase self-control procedure in which the critical phases involved choice between 20 s of cartoon available after a 0.5-s delay (impulsive choice) and 40 s of cartoon delayed for 40 s (self-controlled choice). All the youngest children (3 to 5 months) showed long postreinforcement pauses on the fixed-interval schedule, with most intervals involving the emission of a single, reinforced, response, and all made self-controlled choices. Older subjects (9 to 23 months) either produced the same pattern as the younger ones on the fixed-interval schedule (classified as pause-sensitive subjects) or produced short pauses and higher steady response rates (classified as pause-insensitive subjects). All pause-sensitive subjects made self-controlled choices in the self-control condition, and all pause-insensitive subjects made impulsive ones. PMID:8409821
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... narrative is where you, the applicant, address the selection criteria and two of the competitive preference priorities that reviewers use to evaluate your application. The two competitive preference priorities that... person listed in this notice at least two weeks before the scheduled meeting date. Although we will...
Value of Conditioned Reinforcers as a Function of Temporal Context
ERIC Educational Resources Information Center
O'Daly, Matthew; Meyer, Steven; Fantino, Edmund
2005-01-01
In two experiments, pigeons were trained on a multiple-chain schedule, in which the initial link for one chain was a variable-interval (VI) 100s schedule and for the other chain a VI 10s schedule. The terminal links were both fixed-time 30s schedules signaled by differently colored stimuli. Following training, the pigeons had their preference for…
Combinations of response-reinforcer relations in periodic and aperiodic schedules.
Kuroda, Toshikazu; Cançado, Carlos R X; Lattal, Kennon A; Elcoro, Mirari; Dickson, Chata A; Cook, James E
2013-03-01
Key pecking of 4 pigeons was studied under a two-component multiple schedule in which food deliveries were arranged according to a fixed and a variable interfood interval. The percentage of response-dependent food in each component was varied, first in ascending (0, 10, 30, 70 and 100%) and then in descending orders, in successive conditions. The change in response rates was positively related to the percentage of response-dependent food in each schedule component. Across conditions, positively accelerated and linear patterns of responding occurred consistently in the fixed and variable components, respectively. These results suggest that the response-food dependency determines response rates in periodic and aperiodic schedules, and that the temporal distribution of food determines response patterns independently of the response-food dependency. Running rates, but not postfood pauses, also were positively related to the percentage of dependent food in each condition, in both fixed and variable components. Thus, the relation between overall response rate and the percentage of dependent food was mediated by responding that occurred after postfood pausing. The findings together extend previous studies wherein the dependency was either always present or absent, and increase the generality of the effects of variations in the response-food dependency from aperiodic to periodic schedules. © Society for the Experimental Analysis of Behavior.
NASA Technical Reports Server (NTRS)
Bonk, Ted (Inventor); Hall, Brendan (Inventor); Smithgall, William Todd (Inventor); Varadarajan, Srivatsan (Inventor); DeLay, Benjamin F. (Inventor)
2017-01-01
Systems and methods for network bandwidth, buffers and timing management using hybrid scheduling of traffic with different priorities and guarantees are provided. In certain embodiments, a method of managing network scheduling and configuration comprises, for each transmitting end station, reserving one exclusive buffer for each virtual link to be transmitted from the transmitting end station; for each receiving end station, reserving exclusive buffers for each virtual link to be received at the receiving end station; and for each switch, reserving a exclusive buffer for each virtual link to be received at an input port of the switch. The method further comprises determining if each respective transmitting end station, receiving end station, and switch has sufficient capability to support the reserved buffers; and reporting buffer infeasibility if each respective transmitting end station, receiving end station, and switch does not have sufficient capability to support the reserved buffers.
Resource-constrained scheduling with hard due windows and rejection penalties
NASA Astrophysics Data System (ADS)
Garcia, Christopher
2016-09-01
This work studies a scheduling problem where each job must be either accepted and scheduled to complete within its specified due window, or rejected altogether. Each job has a certain processing time and contributes a certain profit if accepted or penalty cost if rejected. There is a set of renewable resources, and no resource limit can be exceeded at any time. Each job requires a certain amount of each resource when processed, and the objective is to maximize total profit. A mixed-integer programming formulation and three approximation algorithms are presented: a priority rule heuristic, an algorithm based on the metaheuristic for randomized priority search and an evolutionary algorithm. Computational experiments comparing these four solution methods were performed on a set of generated benchmark problems covering a wide range of problem characteristics. The evolutionary algorithm outperformed the other methods in most cases, often significantly, and never significantly underperformed any method.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Special Rate Schedules for Recruitment and Retention General Provisions § 530.302 Definitions. In this... different pay schedules—e.g., a range where special rates (based on a fixed dollar supplement) are higher in..., an LEO special base rate schedule (for grades GS-3 through 10), a locality rate schedule based on GS...
Employee Responses to Flexible Work Schedules: An Inter-Organization, Inter-System Comparison.
ERIC Educational Resources Information Center
Pierce, Jon L.; Newstrom, John W.
1982-01-01
Compared employee affective and behavioral responses to four work schedules--a fixed-hour schedule and three variations of flexible working hours. Hypothesized systematic differences in employee responses reflecting increased flexibility were not supported. Employees generally responded more favorably to flexible hour systems as contrasted with…
Unit Price and Choice in a Token-Reinforcement Context
ERIC Educational Resources Information Center
Foster, Theresa A.; Hackenberg, Timothy D.
2004-01-01
Pigeons were exposed to multiple and concurrent second-order schedules of token reinforcement, with stimulus lights serving as token reinforcers. Tokens were produced and exchanged for food according to various fixed-ratio schedules, yielding equal and unequal unit prices (responses per unit food delivery). On one schedule (termed the "standard…
A Generic and Target Architecture For Command and Control Information Systems
1991-09-01
forces, logistics, and optimum routing of forces to destination; supports development of the force, material and personnel 9 lists, schedules , and...recommendations T.5, T.6, and T.73 for Telefax. Teletex, Textfax, and Telefax are not currently scheduled to become a part of GOSIP. In the 1995-1997 time...defining application interfaces to the func- tional areas that impact resource management, for example, priority scheduling , real-time files, and
Influences on cocaine tolerance assessed under a multiple conjunctive schedule of reinforcement.
Yoon, Jin Ho; Branch, Marc N
2009-11-01
Under multiple schedules of reinforcement, previous research has generally observed tolerance to the rate-decreasing effects of cocaine that has been dependent on schedule-parameter size in the context of fixed-ratio (FR) schedules, but not under the context of fixed-interval (FI) schedules of reinforcement. The current experiment examined the effects of cocaine on key-pecking responses of White Carneau pigeons maintained under a three-component multiple conjunctive FI (10 s, 30 s, & 120 s) FR (5 responses) schedule of food presentation. Dose-effect curves representing the effects of presession cocaine on responding were assessed in the context of (1) acute administration of cocaine (2) chronic administration of cocaine and (3) daily administration of saline. Chronic administration of cocaine generally resulted in tolerance to the response-rate decreasing effects of cocaine, and that tolerance was generally independent of relative FI value, as measured by changes in ED50 values. Daily administration of saline decreased ED50 values to those observed when cocaine was administered acutely. The results show that adding a FR requirement to FI schedules is not sufficient to produce schedule-parameter-specific tolerance. Tolerance to cocaine was generally independent of FI-parameter under the present conjunctive schedules, indicating that a ratio requirement, per se, is not sufficient for tolerance to be dependent on FI parameter.
An Exploration of Remote History Effects in Humans
ERIC Educational Resources Information Center
Okouchi, Hiroto
2007-01-01
One group of undergraduates responded under a fixed-ratio (FR) 25 schedule and a second group responded under a differential-reinforcement-of-low-rate (DRL) 5-s schedule (first history phase). Both groups of subjects were then exposed to a differential-reinforcement-of-other-behavior (DRO) 5-s schedule (second history phase), and finally to…
Scaling up ATLAS Event Service to production levels on opportunistic computing platforms
NASA Astrophysics Data System (ADS)
Benjamin, D.; Caballero, J.; Ernst, M.; Guan, W.; Hover, J.; Lesny, D.; Maeno, T.; Nilsson, P.; Tsulaia, V.; van Gemmeren, P.; Vaniachine, A.; Wang, F.; Wenaus, T.; ATLAS Collaboration
2016-10-01
Continued growth in public cloud and HPC resources is on track to exceed the dedicated resources available for ATLAS on the WLCG. Examples of such platforms are Amazon AWS EC2 Spot Instances, Edison Cray XC30 supercomputer, backfill at Tier 2 and Tier 3 sites, opportunistic resources at the Open Science Grid (OSG), and ATLAS High Level Trigger farm between the data taking periods. Because of specific aspects of opportunistic resources such as preemptive job scheduling and data I/O, their efficient usage requires workflow innovations provided by the ATLAS Event Service. Thanks to the finer granularity of the Event Service data processing workflow, the opportunistic resources are used more efficiently. We report on our progress in scaling opportunistic resource usage to double-digit levels in ATLAS production.
Discrete Event Simulation Models for CT Examination Queuing in West China Hospital.
Luo, Li; Liu, Hangjiang; Liao, Huchang; Tang, Shijun; Shi, Yingkang; Guo, Huili
2016-01-01
In CT examination, the emergency patients (EPs) have highest priorities in the queuing system and thus the general patients (GPs) have to wait for a long time. This leads to a low degree of satisfaction of the whole patients. The aim of this study is to improve the patients' satisfaction by designing new queuing strategies for CT examination. We divide the EPs into urgent type and emergency type and then design two queuing strategies: one is that the urgent patients (UPs) wedge into the GPs' queue with fixed interval (fixed priority model) and the other is that the patients have dynamic priorities for queuing (dynamic priority model). Based on the data from Radiology Information Database (RID) of West China Hospital (WCH), we develop some discrete event simulation models for CT examination according to the designed strategies. We compare the performance of different strategies on the basis of the simulation results. The strategy that patients have dynamic priorities for queuing makes the waiting time of GPs decrease by 13 minutes and the degree of satisfaction increase by 40.6%. We design a more reasonable CT examination queuing strategy to decrease patients' waiting time and increase their satisfaction degrees.
Discrete Event Simulation Models for CT Examination Queuing in West China Hospital
Luo, Li; Tang, Shijun; Shi, Yingkang; Guo, Huili
2016-01-01
In CT examination, the emergency patients (EPs) have highest priorities in the queuing system and thus the general patients (GPs) have to wait for a long time. This leads to a low degree of satisfaction of the whole patients. The aim of this study is to improve the patients' satisfaction by designing new queuing strategies for CT examination. We divide the EPs into urgent type and emergency type and then design two queuing strategies: one is that the urgent patients (UPs) wedge into the GPs' queue with fixed interval (fixed priority model) and the other is that the patients have dynamic priorities for queuing (dynamic priority model). Based on the data from Radiology Information Database (RID) of West China Hospital (WCH), we develop some discrete event simulation models for CT examination according to the designed strategies. We compare the performance of different strategies on the basis of the simulation results. The strategy that patients have dynamic priorities for queuing makes the waiting time of GPs decrease by 13 minutes and the degree of satisfaction increase by 40.6%. We design a more reasonable CT examination queuing strategy to decrease patients' waiting time and increase their satisfaction degrees. PMID:27547237
Voss, Michelle W; Prakash, Ruchika Shaurya; Erickson, Kirk I; Boot, Walter R; Basak, Chandramallika; Neider, Mark B; Simons, Daniel J; Fabiani, Monica; Gratton, Gabriele; Kramer, Arthur F
2012-01-02
We used the Space Fortress videogame, originally developed by cognitive psychologists to study skill acquisition, as a platform to examine learning-induced plasticity of interacting brain networks. Novice videogame players learned Space Fortress using one of two training strategies: (a) focus on all aspects of the game during learning (fixed priority), or (b) focus on improving separate game components in the context of the whole game (variable priority). Participants were scanned during game play using functional magnetic resonance imaging (fMRI), both before and after 20 h of training. As expected, variable priority training enhanced learning, particularly for individuals who initially performed poorly. Functional connectivity analysis revealed changes in brain network interaction reflective of more flexible skill learning and retrieval with variable priority training, compared to procedural learning and skill implementation with fixed priority training. These results provide the first evidence for differences in the interaction of large-scale brain networks when learning with different training strategies. Our approach and findings also provide a foundation for exploring the brain plasticity involved in transfer of trained abilities to novel real-world tasks such as driving, sport, or neurorehabilitation. Copyright © 2011 Elsevier Inc. All rights reserved.
Escape from rich-to-lean transitions: Stimulus change and timeout.
Retzlaff, Billie J; Parthum, Elizabeth T P; Pitts, Raymond C; Hughes, Christine E
2017-01-01
Extended pausing during discriminable transitions from rich-to-lean conditions can be viewed as escape (i.e., rich-to-lean transitions function aversively). In the current experiments, pigeons' key pecking was maintained by a multiple fixed-ratio fixed-ratio schedule of rich or lean reinforcers. Pigeons then were provided with another, explicit, mechanism of escape by changing the stimulus from the transition-specific stimulus used in the multiple schedule to a mixed-schedule stimulus (Experiment 1) or by producing a period of timeout in which the stimulus was turned off and the schedule was suspended (Experiment 2). Overall, escape was under joint control of past and upcoming reinforcer magnitudes, such that responses on the escape key were most likely during rich-to-lean transitions, and second-most likely during lean-to-lean transitions. Even though pigeons pecked the escape key, they paused before doing so, and the latency to begin the fixed ratio (i.e., the pause) remained extended during rich-to-lean transitions. These findings suggest that although the stimulus associated with rich-to-lean transitions functioned aversively, pausing is more than simply escape responding from the stimulus. © 2017 Society for the Experimental Analysis of Behavior.
A half century of scalloping in the work habits of the United States Congress.
Critchfield, Thomas S; Haley, Rebecca; Sabo, Benjamin; Colbert, Jorie; Macropoulis, Georgette
2003-01-01
It has been suggested that the work environment of the United States Congress bears similarity to a fixed-interval reinforcement schedule. Consistent with this notion, Weisberg and Waldrop (1972) described a positively accelerating pattern in annual congressional bill production (selected years from 1947 to 1968) that is reminiscent of the scalloped response pattern often attributed to fixed-interval schedules, but their analysis is now dated and does not bear on the functional relations that might yield scalloping. The present study described annual congressional bill production over a period of 52 years and empirically evaluated predictions derived from four hypotheses about the mechanisms that underlie scalloping. Scalloping occurred reliably in every year. The data supported several predictions about congressional productivity based on fixed-interval schedule performance, but did not consistently support any of three alternative accounts. These findings argue for the external validity of schedule-controlled operant behavior as measured in the laboratory. The present analysis also illustrates a largely overlooked role for applied behavior analysis: that of shedding light on the functional properties of behavior in uncontrolled settings of considerable interest to the public. PMID:14768667
Fu, Richard Z; Anwar, Durria R; Laban, James T; Maratos, Eleni C; Minhas, Pawanjit S; Martin, Andrew J
2017-02-01
External ventricular drain (EVD)-related infection is a significant source of morbidity in neurosurgical patients. Recently, there has been a drive to adopt new catheters with bactericidal properties to reduce infection rates. We propose that the use of standard catheters combined with pre-emptive intrathecal vancomycin (ITV) 10 mg daily provides an effective alternative. Retrospective study of all patients with EVDs between 2010 and 2012, comparing infection rates in those who did and did not receive pre-emptive ITV. All EVDs were of the standard silicon catheter type. CSF infection was defined, as per Centre for Disease Control (CDC) guidelines, as clinical suspicion ± positive CSF gram stain/culture or leucocytosis. Infection rates were compared using Pearson's chi-squared test. 262 EVDs were included in the study, of which 111 were managed with pre-emptive ITV. The infection rate was 2.7% in the vancomycin group and 11.9% in the control group (p<.01). There were no cases of vancomycin-resistant infection in either group. The use of pre-emptive ITV is associated with a significantly lower EVD infection rate. This compares favourably with those reported in the literature for bactericidal catheters.
Reed, Phil
2011-03-01
Binge eating is often associated with stress-induced disruption of typical eating patterns. Three experiments were performed with the aim of developing a potential model for this effect by investigating the effect of presenting response-independent stimuli on rats' lever-pressing for food reinforcement during both fixed-interval (FI) and fixed-ratio (FR) schedules of reinforcement. In Experiment 1, a response-independent brief tone (500-ms, 105-dB, broadband, noisy signal, ranging up to 16 kHz, with spectral peaks at 3 and 500 Hz) disrupted the performance on an FI 60-s schedule. Responding with the response-independent tone was more vigorous than in the absence of the tone. This effect was replicated in Experiment 2 using a within-subject design, but no such effect was noted when a light was employed as a disrupter. In Experiment 3, a 500-ms tone, but not a light, had a similar effect on rats' performance on FR schedules. This tone-induced effect may represent a release from response-inhibition produced by an aversive event. The implications of these results for modeling binge eating are discussed.
A comprehensive approach to reactive power scheduling in restructured power systems
NASA Astrophysics Data System (ADS)
Shukla, Meera
Financial constraints, regulatory pressure, and need for more economical power transfers have increased the loading of interconnected transmission systems. As a consequence, power systems have been operated close to their maximum power transfer capability limits, making the system more vulnerable to voltage instability events. The problem of voltage collapse characterized by a severe local voltage depression is generally believed to be associated with inadequate VAr support at key buses. The goal of reactive power planning is to maintain a high level of voltage security, through installation of properly sized and located reactive sources and their optimal scheduling. In case of vertically-operated power systems, the reactive requirement of the system is normally satisfied by using all of its reactive sources. But in case of different scenarios of restructured power systems, one may consider a fixed amount of exchange of reactive power through tie lines. Reviewed literature suggests a need for optimal scheduling of reactive power generation for fixed inter area reactive power exchange. The present work proposed a novel approach for reactive power source placement and a novel approach for its scheduling. The VAr source placement technique was based on the property of system connectivity. This is followed by development of optimal reactive power dispatch formulation which facilitated fixed inter area tie line reactive power exchange. This formulation used a Line Flow-Based (LFB) model of power flow analysis. The formulation determined the generation schedule for fixed inter area tie line reactive power exchange. Different operating scenarios were studied to analyze the impact of VAr management approach for vertically operated and restructured power systems. The system loadability, losses, generation and the cost of generation were the performance measures to study the impact of VAr management strategy. The novel approach was demonstrated on IEEE 30 bus system.
Wei, Xiaohui; Sun, Bingyi; Cui, Jiaxu; Xu, Gaochao
2016-01-01
As a result of the greatly increased use of mobile devices, the disadvantages of portable devices have gradually begun to emerge. To solve these problems, the use of mobile cloud computing assisted by cloud data centers has been proposed. However, cloud data centers are always very far from the mobile requesters. In this paper, we propose an improved multi-objective local mobile cloud model: Compounded Local Mobile Cloud Architecture with Dynamic Priority Queues (LMCpri). This new architecture could briefly store jobs that arrive simultaneously at the cloudlet in different priority positions according to the result of auction processing, and then execute partitioning tasks on capable helpers. In the Scheduling Module, NSGA-II is employed as the scheduling algorithm to shorten processing time and decrease requester cost relative to PSO and sequential scheduling. The simulation results show that the number of iteration times that is defined to 30 is the best choice of the system. In addition, comparing with LMCque, LMCpri is able to effectively accommodate a requester who would like his job to be executed in advance and shorten execution time. Finally, we make a comparing experiment between LMCpri and cloud assisting architecture, and the results reveal that LMCpri presents a better performance advantage than cloud assisting architecture.
Wei, Xiaohui; Sun, Bingyi; Cui, Jiaxu; Xu, Gaochao
2016-01-01
As a result of the greatly increased use of mobile devices, the disadvantages of portable devices have gradually begun to emerge. To solve these problems, the use of mobile cloud computing assisted by cloud data centers has been proposed. However, cloud data centers are always very far from the mobile requesters. In this paper, we propose an improved multi-objective local mobile cloud model: Compounded Local Mobile Cloud Architecture with Dynamic Priority Queues (LMCpri). This new architecture could briefly store jobs that arrive simultaneously at the cloudlet in different priority positions according to the result of auction processing, and then execute partitioning tasks on capable helpers. In the Scheduling Module, NSGA-II is employed as the scheduling algorithm to shorten processing time and decrease requester cost relative to PSO and sequential scheduling. The simulation results show that the number of iteration times that is defined to 30 is the best choice of the system. In addition, comparing with LMCque, LMCpri is able to effectively accommodate a requester who would like his job to be executed in advance and shorten execution time. Finally, we make a comparing experiment between LMCpri and cloud assisting architecture, and the results reveal that LMCpri presents a better performance advantage than cloud assisting architecture. PMID:27419854
Scheduling revisited workstations in integrated-circuit fabrication
NASA Technical Reports Server (NTRS)
Kline, Paul J.
1992-01-01
The cost of building new semiconductor wafer fabrication factories has grown rapidly, and a state-of-the-art fab may cost 250 million dollars or more. Obtaining an acceptable return on this investment requires high productivity from the fabrication facilities. This paper describes the Photo Dispatcher system which was developed to make machine-loading recommendations on a set of key fab machines. Dispatching policies that generally perform well in job shops (e.g., Shortest Remaining Processing Time) perform poorly for workstations such as photolithography which are visited several times by the same lot of silicon wafers. The Photo Dispatcher evaluates the history of workloads throughout the fab and identifies bottleneck areas. The scheduler then assigns priorities to lots depending on where they are headed after photolithography. These priorities are designed to avoid starving bottleneck workstations and to give preference to lots that are headed to areas where they can be processed with minimal waiting. Other factors considered by the scheduler to establish priorities are the nearness of a lot to the end of its process flow and the time that the lot has already been waiting in queue. Simulations that model the equipment and products in one of Texas Instrument's wafer fabs show the Photo Dispatcher can produce a 10 percent improvement in the time required to fabricate integrated circuits.
Baek, Young Kyun
2008-12-01
The purpose of this study is to identify factors inhibiting teachers' use of computer and video games in the classroom setting and to examine the degree to which teaching experience and gender affect attitudes toward using games. Six factors that hinder teachers' use of games in the classroom were discovered: Inflexibility of curriculum, Negative effects of gaming, Students' lack of readiness, Lack of supporting materials, Fixed class schedules, and Limited budgets. Lack of supporting material, Fixed class schedules, and Limited budgets were factors that female teachers believed to be more serious obstacles to game use in the classroom than male teachers did. Experienced teachers, more so than inexperienced teachers, believed that adopting games in teaching was hindered by Inflexibility of curriculum and Negative effects of gaming. On the other hand, inexperienced teachers, more so than experienced teachers, believed that adopting games in teaching is less hindered by Lack of supporting materials and Fixed class schedules.
Enhancing the Cassini Mission Through FP Applications After Launch
NASA Technical Reports Server (NTRS)
Morgan, Paula S.
2016-01-01
Although rigorous pre-emptive measures are taken to preclude failures and anomalous conditions from occurring in JPL spacecraft missions prior to launch, unforeseeable problems can still surface after liftoff. In the case of the Cassini/Huygens Mission-to-Saturn spacecraft, several problems were observed post-launch: 1) immediately after takeoff, the collected engineering/science data stored on the Solid State Recorders (SSR) contained a significantly higher number of corrupted bits than was expected (considerably over spec) due to human error in the memory mapping of these devices, 2) numerous Solid State Power Switches (SSPS) sporadically tripped off throughout the mission due to cosmic ray bombardment from the unique space environment, and 3) false assumptions in the pressure regulator design in combination with missing heritage test data led to inaccurate design conclusions, causing the issuance of two waivers for the regulator to close properly (a potentially mission catastrophic single-point failure which occurred 24 days after launch) - amongst other problems. For Cassini, some of these anomalies led to arduous work-arounds or required continuous monitoring of telemetry variables by the ground-based Spacecraft Operations Flight Support (SOFS) team in order to detect and fix fault occurrences as they happened. Fortunately, sufficient funding and schedule margin allowed several Fault Protection (FP) solutions to be implemented into post-launch Flight Software (FSW) uploads to help resolve these issues autonomously, reducing SOFS ground support efforts while improving anomaly recovery time in order to preserve maximum science capture. This paper details the FP applications used to resolve the above issues as well as to optimize solutions for several other problems experienced by the Cassini spacecraft during its fight, in order to enhance the spacecraft's overall mission success throughout the 18 years of its 20 year expedition to and within the Saturnian system.
Künzle, N; Petignat, C; Francioli, P; Vogel, G; Seydoux, C; Corpataux, J M; Sahli, R; Meylan, P R
2000-09-01
Cytomegalovirus (CMV) remains a major cause of morbidity in solid organ transplant patients. In order to reduce CMV morbidity, we designed a program of routine virological monitoring that included throat and urine CMV shell vial culture, along with peripheral blood leukocyte (PBL) shell vial quantitative culture for 12 weeks post-transplantation, as well as 8 weeks after treatment for acute rejection. The program also included preemptive ganciclovir treatment for those patients with the highest risk of developing CMV disease, i.e., with either high-level viremia (>10 infectious units [IU]/106 PBL) or low-level viremia (<10 IU/106 PBL) and either D+/R- CMV serostatus or treatment for graft rejection. During 1995-96, 90 solid organ transplant recipients (39 kidneys, 28 livers, and 23 hearts) were followed up. A total of 60 CMV infection episodes occurred in 45 patients. Seventeen episodes were symptomatic. Of 26 episodes managed according to the program, only 4 presented with CMV disease and none died. No patient treated preemptively for asymptomatic infection developed disease. In contrast, among 21 episodes managed in non-compliance with the program (i.e., the monitoring was not performed or preemptive treatment was not initiated despite a high risk of developing CMV disease), 12 episodes turned into symptomatic infection (P=0.0048 compared to patients treated preemptively), and 2 deaths possibly related to CMV were recorded. This difference could not be explained by an increased proportion of D+/R- patients or an increased incidence of rejection among patients with episodes treated in non-compliance with the program. Our data identify compliance with guidelines as an important factor in effectively reducing CMV morbidity through preemptive treatment, and suggest that the complexity of the preemptive approach may represent an important obstacle to the successful prevention of CMV morbidity by this approach in the regular healthcare setting.
Design Considerations for a New Terminal Area Arrival Scheduler
NASA Technical Reports Server (NTRS)
Thipphavong, Jane; Mulfinger, Daniel
2010-01-01
Design of a terminal area arrival scheduler depends on the interrelationship between throughput, delay and controller intervention. The main contribution of this paper is an analysis of the above interdependence for several stochastic behaviors of expected system performance distributions in the aircraft s time of arrival at the meter fix and runway. Results of this analysis serve to guide the scheduler design choices for key control variables. Two types of variables are analyzed, separation buffers and terminal delay margins. The choice for these decision variables was tested using sensitivity analysis. Analysis suggests that it is best to set the separation buffer at the meter fix to its minimum and adjust the runway buffer to attain the desired system performance. Delay margin was found to have the least effect. These results help characterize the variables most influential in the scheduling operations of terminal area arrivals.
Fixed-interval performance and self-control in children.
Darcheville, J C; Rivière, V; Wearden, J H
1992-01-01
Operant responses of 16 children (mean age 6 years and 1 month) were reinforced according to different fixed-interval schedules (with interreinforcer intervals of 20, 30, or 40 s) in which the reinforcers were either 20-s or 40-s presentations of a cartoon. In another procedure, they received training on a self-control paradigm in which both reinforcer delay (0.5 s or 40 s) and reinforcer duration (20 s or 40 s of cartoons) varied, and subjects were offered a choice between various combinations of delay and duration. Individual differences in behavior under the self-control procedure were precisely mirrored by individual differences under the fixed-interval schedule. Children who chose the smaller immediate reinforcer on the self-control procedure (impulsive) produced short postreinforcement pauses and high response rates in the fixed-interval conditions, and both measures changed little with changes in fixed-interval value. Conversely, children who chose the larger delayed reinforcer in the self-control condition (the self-controlled subjects) exhibited lower response rates and long postreinforcement pauses, which changed systematically with changes in the interval, in their fixed-interval performances. PMID:1573372
49 CFR 244.3 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 244.3 Section 244.3 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION REGULATIONS ON SAFETY INTEGRATION PLANS GOVERNING RAILROAD CONSOLIDATIONS...
Tolerance to Effects of Cocaine on Behavior under a Response-Initiated Fixed-Interval Schedule
ERIC Educational Resources Information Center
Weaver, Matthew T.; Branch, Marc N.
2008-01-01
Tolerance to effects of cocaine can be modulated by schedules of reinforcement. With multiple ratio schedules, research has shown an inverse relationship between ratio requirement and amount of tolerance that resulted from daily administration of the drug. In contrast, tolerance to the effects of cocaine on behavior under multiple interval…
Estimation of Teacher Salary Schedules. Educational Planning Occasional Papers No. 6/72.
ERIC Educational Resources Information Center
Burtnyk, W. A.
This paper describes the method used by Tracz and Burtnyk for the estimation of future salary schedules in the Ontario secondary school system. The application of the algorithm to the Ontario secondary school system predicts a possible breakdown in the fixed step salary schedule at about 1980. This situation results primarily because of the…
Job Priorities on Peregrine | High-Performance Computing | NREL
allocation when run with qos=high. Requesting a Node Reservation If you are doing work that requires real scheduler more efficiently plan resources for larger jobs. When projects reach their allocation limit, jobs associated with those projects will run at very low priority, which will ensure that these jobs run only when
Packet Scheduling Mechanism to Improve Quality of Short Flows and Low-Rate Flows
NASA Astrophysics Data System (ADS)
Yokota, Kenji; Asaka, Takuya; Takahashi, Tatsuro
In recent years elephant flows are increasing by expansion of peer-to-peer (P2P) applications on the Internet. As a result, bandwidth is occupied by specific users triggering unfair resource allocation. The main packet-scheduling mechanism currently employed is first-in first-out (FIFO) where the available bandwidth of short flows is limited by elephant flows. Least attained service (LAS), which decides transfer priority of packets by the total amount of transferred data in all flows, was proposed to solve this problem. However, routers with LAS limit flows with large amount of transferred data even if they are low-rate. Therefore, it is necessary to improve the quality of low-rate flows with long holding times such as voice over Internet protocol (VoIP) applications. This paper proposes rate-based priority control (RBPC), which calculates the flow rate and control the priority by using it. Our proposed method can transfer short flows and low-rate flows in advance. Moreover, its fair performance is shown through simulations.
TinyOS-based quality of service management in wireless sensor networks
Peterson, N.; Anusuya-Rangappa, L.; Shirazi, B.A.; Huang, R.; Song, W.-Z.; Miceli, M.; McBride, D.; Hurson, A.; LaHusen, R.
2009-01-01
Previously the cost and extremely limited capabilities of sensors prohibited Quality of Service (QoS) implementations in wireless sensor networks. With advances in technology, sensors are becoming significantly less expensive and the increases in computational and storage capabilities are opening the door for new, sophisticated algorithms to be implemented. Newer sensor network applications require higher data rates with more stringent priority requirements. We introduce a dynamic scheduling algorithm to improve bandwidth for high priority data in sensor networks, called Tiny-DWFQ. Our Tiny-Dynamic Weighted Fair Queuing scheduling algorithm allows for dynamic QoS for prioritized communications by continually adjusting the treatment of communication packages according to their priorities and the current level of network congestion. For performance evaluation, we tested Tiny-DWFQ, Tiny-WFQ (traditional WFQ algorithm implemented in TinyOS), and FIFO queues on an Imote2-based wireless sensor network and report their throughput and packet loss. Our results show that Tiny-DWFQ performs better in all test cases. ?? 2009 IEEE.
Impact of Prophylactic Versus Preemptive Valganciclovir on Long-term Renal Allograft Outcomes
Spinner, Michael L.; Saab, Georges; Casabar, Ed; Bowman, Lyndsey J.; Storch, Gregory A.; Brennan, Daniel C.
2010-01-01
Background Both prophylactic and preemptive oral valganciclovir therapy are effective for management of cytomegalovirus (CMV) post renal transplantation in the short-term. The long-term effect of either strategy is less well-defined. Methods We analyzed data on 115 adult recipients previously enrolled in a prospective randomized controlled trial of prophylaxis versus preemptive therapy for CMV. The primary outcome was a composite of freedom from acute rejection, graft loss, or death. Secondary outcomes included individual primary outcomes, post-transplant cardiovascular events, new-onset diabetes mellitus after transplant (NODAT), achievement of goal blood pressure, change in body mass index (BMI), interstitial fibrosis/tubular atrophy (IF/TA) and change in renal function. The analysis period was a 48-months post-transplant or date of death/graft loss, whichever was earlier. Results The primary outcome was similar between groups (83% prophylactic versus 81% preemptive, p = 0.754). The secondary outcomes showed similarities between the prophylactic and preemptive groups. Four patients in the prophylactic group (8%) compared to none in the preemptive group (0%) died with a functioning graft, p=0.043. Conclusions Within the limitations of sample size, our data suggest that either strategy for the management of CMV immediately post-transplantation appears effective for patient and graft survival in the long-term. CMV-management is one of many therapeutic strategies incorporated into a renal transplantation protocol which often differs among institutions, and the decision as to which approach to use remains center and resource specific. The increased incidence of death in the prophylactic group requires further investigation. PMID:20555305
Hoffmeister, F
1980-01-01
Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.
A model-based economic analysis of pre-pandemic influenza vaccination cost-effectiveness.
Halder, Nilimesh; Kelso, Joel K; Milne, George J
2014-05-16
A vaccine matched to a newly emerged pandemic influenza virus would require a production time of at least 6 months with current proven techniques, and so could only be used reactively after the peak of the pandemic. A pre-pandemic vaccine, although probably having lower efficacy, could be produced and used pre-emptively. While several previous studies have investigated the cost effectiveness of pre-emptive vaccination strategies, they have not been directly compared to realistic reactive vaccination strategies. An individual-based simulation model of ~30,000 people was used to examine a pre-emptive vaccination strategy, assuming vaccination conducted prior to a pandemic using a low-efficacy vaccine. A reactive vaccination strategy, assuming a 6-month delay between pandemic emergence and availability of a high-efficacy vaccine, was also modelled. Social distancing and antiviral interventions were examined in combination with these alternative vaccination strategies. Moderate and severe pandemics were examined, based on estimates of transmissibility and clinical severity of the 1957 and 1918 pandemics respectively, and the cost effectiveness of each strategy was evaluated. Provided that a pre-pandemic vaccine achieved at least 30% efficacy, pre-emptive vaccination strategies were found to be more cost effective when compared to reactive vaccination strategies. Reactive vaccination coupled with sustained social distancing and antiviral interventions was found to be as effective at saving lives as pre-emptive vaccination coupled with limited duration social distancing and antiviral use, with both strategies saving approximately 420 life-years per 10,000 population for a moderate pandemic with a basic reproduction number of 1.9 and case fatality rate of 0.25%. Reactive vaccination was however more costly due to larger productivity losses incurred by sustained social distancing, costing $8 million per 10,000 population ($19,074/LYS) versus $6.8 million per 10,000 population ($15,897/LYS) for a pre-emptive vaccination strategy. Similar trends were observed for severe pandemics. Compared to reactive vaccination, pre-emptive strategies would be more effective and more cost effective, conditional on the pre-pandemic vaccine being able to achieve a certain level of coverage and efficacy. Reactive vaccination strategies exist which are as effective at mortality reduction as pre-emptive strategies, though they are less cost effective.
A model-based economic analysis of pre-pandemic influenza vaccination cost-effectiveness
2014-01-01
Background A vaccine matched to a newly emerged pandemic influenza virus would require a production time of at least 6 months with current proven techniques, and so could only be used reactively after the peak of the pandemic. A pre-pandemic vaccine, although probably having lower efficacy, could be produced and used pre-emptively. While several previous studies have investigated the cost effectiveness of pre-emptive vaccination strategies, they have not been directly compared to realistic reactive vaccination strategies. Methods An individual-based simulation model of ~30,000 people was used to examine a pre-emptive vaccination strategy, assuming vaccination conducted prior to a pandemic using a low-efficacy vaccine. A reactive vaccination strategy, assuming a 6-month delay between pandemic emergence and availability of a high-efficacy vaccine, was also modelled. Social distancing and antiviral interventions were examined in combination with these alternative vaccination strategies. Moderate and severe pandemics were examined, based on estimates of transmissibility and clinical severity of the 1957 and 1918 pandemics respectively, and the cost effectiveness of each strategy was evaluated. Results Provided that a pre-pandemic vaccine achieved at least 30% efficacy, pre-emptive vaccination strategies were found to be more cost effective when compared to reactive vaccination strategies. Reactive vaccination coupled with sustained social distancing and antiviral interventions was found to be as effective at saving lives as pre-emptive vaccination coupled with limited duration social distancing and antiviral use, with both strategies saving approximately 420 life-years per 10,000 population for a moderate pandemic with a basic reproduction number of 1.9 and case fatality rate of 0.25%. Reactive vaccination was however more costly due to larger productivity losses incurred by sustained social distancing, costing $8 million per 10,000 population ($19,074/LYS) versus $6.8 million per 10,000 population ($15,897/LYS) for a pre-emptive vaccination strategy. Similar trends were observed for severe pandemics. Conclusions Compared to reactive vaccination, pre-emptive strategies would be more effective and more cost effective, conditional on the pre-pandemic vaccine being able to achieve a certain level of coverage and efficacy. Reactive vaccination strategies exist which are as effective at mortality reduction as pre-emptive strategies, though they are less cost effective. PMID:24884470
Xu, Jiuping; Feng, Cuiying
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.
Xu, Jiuping
2014-01-01
This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708
Data-oriented scheduling for PROOF
NASA Astrophysics Data System (ADS)
Xu, Neng; Guan, Wen; Wu, Sau Lan; Ganis, Gerardo
2011-12-01
The Parallel ROOT Facility - PROOF - is a distributed analysis system optimized for I/O intensive analysis tasks of HEP data. With LHC entering the analysis phase, PROOF has become a natural ingredient for computing farms at Tier3 level. These analysis facilities will typically be used by a few tenths of users, and can also be federated into a sort of analysis cloud corresponding to the Virtual Organization of the experiment. Proper scheduling is required to guarantee fair resource usage, to enforce priority policies and to optimize the throughput. In this paper we discuss an advanced priority system that we are developing for PROOF. The system has been designed to automatically adapt to unknown length of the tasks, to take into account the data location and availability (including distribution across geographically separated sites), and the {group, user} default priorities. In this system, every element - user, group, dataset, job slot and storage - gets its priority and those priorities are dynamically linked with each other. In order to tune the interplay between the various components, we have designed and started implementing a simulation application that can model various type and size of PROOF clusters. In this application a monitoring package records all the changes of them so that we can easily understand and tune the performance. We will discuss the status of our simulation and show examples of the results we are expecting from it.
Drug discrimination under two concurrent fixed-interval fixed-interval schedules.
McMillan, D E; Li, M
2000-07-01
Pigeons were trained to discriminate 5.0 mg/kg pentobarbital from saline under a two-key concurrent fixed-interval (FI) 100-s FI 200-s schedule of food presentation, and later tinder a concurrent FI 40-s FI 80-s schedule, in which the FI component with the shorter time requirement reinforced responding on one key after drug administration (pentobarbital-biased key) and on the other key after saline administration (saline-biased key). After responding stabilized under the concurrent FI 100-s FI 200-s schedule, pigeons earned an average of 66% (after pentobarbital) to 68% (after saline) of their reinforcers for responding under the FI 100-s component of the concurrent schedule. These birds made an average of 70% of their responses on both the pentobarbital-biased key after the training dose of pentobarbital and the saline-biased key after saline. After responding stabilized under the concurrent FI 40-s FI 80-s schedule, pigeons earned an average of 67% of their reinforcers for responding under the FI 40 component after both saline and the training dose of pentobarbital. These birds made an average of 75% of their responses on the pentobarbital-biased key after the training dose of pentobarbital, but only 55% of their responses on the saline-biased key after saline. In test sessions preceded by doses of pentobarbital, chlordiazepoxide, ethanol, phencyclidine, or methamphetamine, the dose-response curves were similar under these two concurrent schedules. Pentobarbital, chlordiazepoxide, and ethanol produced dose-dependent increases in responding on the pentobarbital-biased key as the doses increased. For some birds, at the highest doses of these drugs, the dose-response curve turned over. Increasing doses of phencyclidine produced increased responding on the pentobarbital-biased key in some, but not all, birds. After methamphetamine, responding was largely confined to the saline-biased key. These data show that pigeons can perform drug discriminations under concurrent schedules in which the reinforcement frequency under the schedule components differs only by a factor of two, and that when other drugs are substituted for the training drugs they produce dose-response curves similar to the curves produced by these drugs under other concurrent interval schedules.
HPV vaccine catch up schedule - an opportunity for chlamydia screening.
Grotowski, Miriam; May, Jenny
2008-07-01
The human papillomavirus (HPV) vaccine (Gardasil) catch up schedule in general practice is available until June 2009 to females not in school and under the age of 27 years. A course of three injections is given over 6 months. This provides a unique opportunity for sexual health screening in an age group where chlamydia screening is a priority.
Spatial analysis of fuel treatment options for chaparral on the Angeles national forest
G. Jones; J. Chew; R. Silverstein; C. Stalling; J. Sullivan; J. Troutwine; D. Weise; D. Garwood
2008-01-01
Spatial fuel treatment schedules were developed for the chaparral vegetation type on the Angeles National Forest using the Multi-resource Analysis and Geographic Information System (MAGIS). Schedules varied by the priority given to various wildland urban interface areas and the general forest, as well as by the number of acres treated per decade. The effectiveness of...
Relationship between shift work schedule and self-reported sleep quality in Chinese employees.
Ma, Yifei; Wei, Fu; Nie, Guanghui; Zhang, Li'e; Qin, Jian; Peng, Suwan; Xiong, Feng; Zhang, Zhiyong; Yang, Xiaobo; Peng, Xiaowu; Wang, Mingjun; Zou, Yunfeng
2018-02-01
Few studies have reported on the effects of fixed and rotating shift systems on the prevalence of sleep disturbance. Thus, in this study, the relationships between different work schedules and sleep disturbance in Chinese workers were investigated. A total of 2180 workers aged 19-65 years responded to the self-report questionnaire on shift work schedule (fixed day-shift, fixed night-shift, two-shift or three-shift system), working hours a day, and working days a week, physical effort, subjective sleep quality and subjective mental state. It was found that the rotating shift workers, namely, two- and three-shift workers, exhibited higher risks of sleep disturbance than with the fixed day-shift workers did (OR 1.37; 95% CI 1.07to 1.74; and OR 2.19; 95% CI 1.52 to 3.15, respectively). The risk was particularly high among two- or three-shift workers who worked more than 8 hours a day or more than 5 days a week and among three-shift workers who reported both light and heavy physical effort at work. Moreover, the two- and three-shift workers (rotating shift workers) suffered from poorer sleep quality than the fixed night shift workers did (OR 1.84; 95% CI 1.01 to 3.32; and OR 2.94; 95% CI 1.53 to 5.64, respectively). Consequently, rotating shift work (two- and three-shift work) is a risk factor for sleep disturbance, and the fixed work rhythm may contribute to the quality of sleep.
PREEMPTIVE PHARMACOGENETIC TESTING: EXPLORING THE KNOWLEDGE AND PERSPECTIVES OF UNITED STATES PAYERS
Keeling, Nicholas J.; Rosenthal, Meagen M.; West-Strum, Donna; Patel, Amit; Haidar, Cyrine E.; Hoffman, James M.
2017-01-01
PURPOSE Preemptive pharmacogenetic testing aims to optimize medication use by having genetic information at the point of prescribing. Payers’ decisions influence implementation of this technology. We investigated U.S. payers’ knowledge, awareness, and perspectives on preemptive pharmacogenetic testing. METHODS A qualitative study was conducted using semi-structured interviews. Participants were screened for eligibility through an online survey. A blended inductive and deductive approach was used to analyze the transcripts. Two authors conducted an iterative reading process to code and categorize the data. RESULTS Medical or pharmacy directors from 14 payer organizations covering 122 million U.S. lives were interviewed. Three concept domains and ten dimensions were developed. Key findings include: clinical utility concerns and limited exposure to preemptive germline testing, continued preference for outcomes from randomized controlled trials, interest in guideline development, importance of demonstrating an impact on clinical decision making, concerns of downstream costs and benefit predictability, and the impact of public stakeholders such as the FDA and CMS. CONCLUSION Both barriers and potential facilitators exist to developing cohesive reimbursement policy for pharmacogenetics, and there are unique challenges for the preemptive testing model. Prospective outcome studies, more precisely defining target populations, and predictive economic models are important considerations for future research. PMID:29261180
Dopaminergic Actions of D-Amphetamine on Schedule-Induced Polydipsia in Rats
ERIC Educational Resources Information Center
Pellon, Ricardo; Ruiz, Ana; Rodriguez, Cilia; Flores, Pilar
2007-01-01
Schedule-induced polydipsia in rats was developed by means of a fixed-time 60-s schedule of food presentation. The acute administration of d-amphetamine sulfate (0.1-3.0 mg/kg) produced a dose-dependent decrease in the rate of licking. D-Amphetamine shifted to the left the temporal distribution of adjunctive drinking within interfood intervals.…
78 FR 41132 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... amendments to eliminate the prohibition against general solicitation and general advertising in certain... times, changes in Commission priorities require alterations in the scheduling of meeting items. For...
Integration of Fixed and Flexible Route Public Transportation Systems, Phase I
DOT National Transportation Integrated Search
2012-01-01
To provide efficient public transportation services in areas with high demand variability over time, it may be desirable : to switch vehicles between conventional services (with fixed routes and schedules) during peak periods and flexible : route ser...
Distributed computing feasibility in a non-dedicated homogeneous distributed system
NASA Technical Reports Server (NTRS)
Leutenegger, Scott T.; Sun, Xian-He
1993-01-01
The low cost and availability of clusters of workstations have lead researchers to re-explore distributed computing using independent workstations. This approach may provide better cost/performance than tightly coupled multiprocessors. In practice, this approach often utilizes wasted cycles to run parallel jobs. The feasibility of such a non-dedicated parallel processing environment assuming workstation processes have preemptive priority over parallel tasks is addressed. An analytical model is developed to predict parallel job response times. Our model provides insight into how significantly workstation owner interference degrades parallel program performance. A new term task ratio, which relates the parallel task demand to the mean service demand of nonparallel workstation processes, is introduced. It was proposed that task ratio is a useful metric for determining how large the demand of a parallel applications must be in order to make efficient use of a non-dedicated distributed system.
Rahim, M; Kazi, B M; Bile, K M; Munir, M; Khan, A R
2010-01-01
The disease early warning system (DEWS) was introduced in the immediate aftermath of the 2005 earthquake in Pakistan, with the objective to undertake prompt investigation and mitigation of disease outbreaks. The DEWS network was replicated successfully during subsequent flood and earthquake disasters as well as during the 2008-09 internally displaced persons' crisis. DEWS-generated alerts, prompt investigations and timely responses had an effective contribution to the control of epidemics. Through DEWS, 1360 reported alerts during 2005-09 averted the risk of disease outbreaks through pre-emptive necessary measures, while the 187 confirmed outbreaks were effectively controlled. In the aftermath of the disasters, DEWS technology also facilitated the development of a disease-surveillance system that became an integral part of the district health system. This study aims to report the DEWS success and substantiate its lead role as a priority emergency health response intervention.
Conservative parallel simulation of priority class queueing networks
NASA Technical Reports Server (NTRS)
Nicol, David
1992-01-01
A conservative synchronization protocol is described for the parallel simulation of queueing networks having C job priority classes, where a job's class is fixed. This problem has long vexed designers of conservative synchronization protocols because of its seemingly poor ability to compute lookahead: the time of the next departure. For, a job in service having low priority can be preempted at any time by an arrival having higher priority and an arbitrarily small service time. The solution is to skew the event generation activity so that the events for higher priority jobs are generated farther ahead in simulated time than lower priority jobs. Thus, when a lower priority job enters service for the first time, all the higher priority jobs that may preempt it are already known and the job's departure time can be exactly predicted. Finally, the protocol was analyzed and it was demonstrated that good performance can be expected on the simulation of large queueing networks.
Conservative parallel simulation of priority class queueing networks
NASA Technical Reports Server (NTRS)
Nicol, David M.
1990-01-01
A conservative synchronization protocol is described for the parallel simulation of queueing networks having C job priority classes, where a job's class is fixed. This problem has long vexed designers of conservative synchronization protocols because of its seemingly poor ability to compute lookahead: the time of the next departure. For, a job in service having low priority can be preempted at any time by an arrival having higher priority and an arbitrarily small service time. The solution is to skew the event generation activity so that the events for higher priority jobs are generated farther ahead in simulated time than lower priority jobs. Thus, when a lower priority job enters service for the first time, all the higher priority jobs that may preempt it are already known and the job's departure time can be exactly predicted. Finally, the protocol was analyzed and it was demonstrated that good performance can be expected on the simulation of large queueing networks.
A horizon scan of future threats and opportunities for pollinators and pollination.
Brown, Mark J F; Dicks, Lynn V; Paxton, Robert J; Baldock, Katherine C R; Barron, Andrew B; Chauzat, Marie-Pierre; Freitas, Breno M; Goulson, Dave; Jepsen, Sarina; Kremen, Claire; Li, Jilian; Neumann, Peter; Pattemore, David E; Potts, Simon G; Schweiger, Oliver; Seymour, Colleen L; Stout, Jane C
2016-01-01
Background. Pollinators, which provide the agriculturally and ecologically essential service of pollination, are under threat at a global scale. Habitat loss and homogenisation, pesticides, parasites and pathogens, invasive species, and climate change have been identified as past and current threats to pollinators. Actions to mitigate these threats, e.g., agri-environment schemes and pesticide-use moratoriums, exist, but have largely been applied post-hoc. However, future sustainability of pollinators and the service they provide requires anticipation of potential threats and opportunities before they occur, enabling timely implementation of policy and practice to prevent, rather than mitigate, further pollinator declines. Methods.Using a horizon scanning approach we identified issues that are likely to impact pollinators, either positively or negatively, over the coming three decades. Results.Our analysis highlights six high priority, and nine secondary issues. High priorities are: (1) corporate control of global agriculture, (2) novel systemic pesticides, (3) novel RNA viruses, (4) the development of new managed pollinators, (5) more frequent heatwaves and drought under climate change, and (6) the potential positive impact of reduced chemical use on pollinators in non-agricultural settings. Discussion. While current pollinator management approaches are largely driven by mitigating past impacts, we present opportunities for pre-emptive practice, legislation, and policy to sustainably manage pollinators for future generations.
A horizon scan of future threats and opportunities for pollinators and pollination
Dicks, Lynn V.; Paxton, Robert J.; Baldock, Katherine C.R.; Barron, Andrew B.; Chauzat, Marie-Pierre; Freitas, Breno M.; Goulson, Dave; Jepsen, Sarina; Kremen, Claire; Li, Jilian; Neumann, Peter; Pattemore, David E.; Potts, Simon G.; Schweiger, Oliver; Seymour, Colleen L.; Stout, Jane C.
2016-01-01
Background. Pollinators, which provide the agriculturally and ecologically essential service of pollination, are under threat at a global scale. Habitat loss and homogenisation, pesticides, parasites and pathogens, invasive species, and climate change have been identified as past and current threats to pollinators. Actions to mitigate these threats, e.g., agri-environment schemes and pesticide-use moratoriums, exist, but have largely been applied post-hoc. However, future sustainability of pollinators and the service they provide requires anticipation of potential threats and opportunities before they occur, enabling timely implementation of policy and practice to prevent, rather than mitigate, further pollinator declines. Methods.Using a horizon scanning approach we identified issues that are likely to impact pollinators, either positively or negatively, over the coming three decades. Results.Our analysis highlights six high priority, and nine secondary issues. High priorities are: (1) corporate control of global agriculture, (2) novel systemic pesticides, (3) novel RNA viruses, (4) the development of new managed pollinators, (5) more frequent heatwaves and drought under climate change, and (6) the potential positive impact of reduced chemical use on pollinators in non-agricultural settings. Discussion. While current pollinator management approaches are largely driven by mitigating past impacts, we present opportunities for pre-emptive practice, legislation, and policy to sustainably manage pollinators for future generations. PMID:27602260
46 CFR 107.01 - Purpose; preemptive effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Purpose; preemptive effect. 107.01 Section 107.01 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS... rules for the design, construction, equipment, inspection and operation of mobile offshore drilling...
46 CFR 107.01 - Purpose; preemptive effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Purpose; preemptive effect. 107.01 Section 107.01 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS... rules for the design, construction, equipment, inspection and operation of mobile offshore drilling...
46 CFR 107.01 - Purpose; preemptive effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Purpose; preemptive effect. 107.01 Section 107.01 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS... rules for the design, construction, equipment, inspection and operation of mobile offshore drilling...
49 CFR 228.13 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 228.13 Section 228.13 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... effect. Under 49 U.S.C. 20106, issuance of the regulations in this part preempts any State law...
49 CFR 230.5 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 230.5 Section 230.5 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... effect. The Locomotive Boiler Inspection Act (49 U.S.C. 20701-20703) preempts all State laws or...
46 CFR 169.101 - Purpose; preemptive effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS General Provisions § 169.101 Purpose; preemptive effect. The regulations in this part set forth uniform requirements which are suited to the particular characteristics and specialized operations of sailing school...
46 CFR 169.101 - Purpose; preemptive effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS General Provisions § 169.101 Purpose; preemptive effect. The regulations in this part set forth uniform requirements which are suited to the particular characteristics and specialized operations of sailing school...
46 CFR 169.101 - Purpose; preemptive effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS General Provisions § 169.101 Purpose; preemptive effect. The regulations in this part set forth uniform requirements which are suited to the particular characteristics and specialized operations of sailing school...
Jung, Jong Dal; Kim, Sang Hun; Yu, Byung Sik; Kim, Hye Ji
2014-08-01
Hypoxemia during one-lung ventilation (OLV) remains a major concern. The present study compared the effect of alveolar recruitment strategy (ARS) on arterial oxygenation during OLV at varying tidal volumes (Vt) with or without positive end-expiratory pressure (PEEP). In total, 120 patients undergoing wedge resection by video assisted thoracostomy were randomized into four groups comprising 30 patients each: those administered a 10 ml/kg tidal volume with or without preemptive ARS (Group H and Group H-ARS, respectively) and those administered a 6 ml/kg tidal volume and a 8 cmH2O PEEP with or without preemptive ARS (Group L and Group L-ARS, respectively). ARS was performed using pressure-controlled ventilation with a 40 cmH2O plateau airway pressure and a 15 cmH2O PEEP for at least 10 breaths until OLV began. Preemptive ARS significantly improved the PaO2/FiO2 ratio compared to the groups that did not receive ARS (P < 0.05). The H-ARS group showed a highest PaO2/FiO2 ratio during OLV, the L-ARS and H groups showed similarly improved arterial oxygenation, which was significantly higher than in group L (P < 0.05). The plateau airway pressure in group H-ARS was significantly higher than in group L-ARS (P < 0.05). Preemptive ARS can improve arterial oxygenation during OLV. Furthermore, a 6 ml/kg tidal volume combined with 8 cmH2O PEEP after preemptive ARS may reduce the risk of pulmonary injury caused by high tidal volume during one-lung ventilation in patients with normal pulmonary function.
What 50 Years of Research Tell Us About Pausing Under Ratio Schedules of Reinforcement
Schlinger, Henry D; Derenne, Adam; Baron, Alan
2008-01-01
Textbooks in learning and behavior commonly describe performance on fixed-ratio schedules as “break and run,” indicating that after reinforcement subjects typically pause and then respond quickly to the next reinforcement. Performance on variable-ratio schedules, on the other hand, is described as steady and fast, with few long pauses. Beginning with Ferster and Skinner's magnum opus, Schedules of Reinforcement (1957), the literature on pausing under ratio schedules has identified the influences on pausing of numerous important variables, in particular ratio size and reinforcement magnitude. As a result, some previously held assumptions have been called into question. For example, research has shown that the length of the pause is controlled not only by the preceding ratio, as Ferster and Skinner and others had assumed (and as implied by the phrase postreinforcement pause), but by the upcoming ratio as well. Similarly, despite the commonly held belief that ratio pausing is unique to the fixed-ratio schedule, there is evidence that pausing also occurs under variable-ratio schedules. If such widely held beliefs are incorrect, then what about other assumptions? This article selectively examines the literature on pausing under ratio schedules over the past 50 years and concludes that although there may indeed be some common patterns, there are also inconsistencies that await future resolution. Several accounts of pausing under ratio schedules are discussed along with the implications of the literature for human performances, most notably the behaviors termed procrastination. PMID:22478501
Integration of Fixed and Flexible Route Public Transportation Systems, Phase II
DOT National Transportation Integrated Search
2012-01-01
Conventional bus service (with fixed routes and schedules) has lower average cost than flexible bus service (with : demand-responsive routes) at high demand densities. At low demand densities flexible bus service has lower : average costs and provide...
Code of Federal Regulations, 2012 CFR
2012-10-01
... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout... priority station for one hour following the scheduled time of completion of the broadcast of a live sports...
Code of Federal Regulations, 2013 CFR
2013-10-01
... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout... priority station for one hour following the scheduled time of completion of the broadcast of a live sports...
Code of Federal Regulations, 2014 CFR
2014-10-01
... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout... priority station for one hour following the scheduled time of completion of the broadcast of a live sports...
Code of Federal Regulations, 2011 CFR
2011-10-01
... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout... priority station for one hour following the scheduled time of completion of the broadcast of a live sports...
Code of Federal Regulations, 2010 CFR
2010-10-01
... CABLE TELEVISION SERVICE Network Non-duplication Protection, Syndicated Exclusivity and Sports Blackout... priority station for one hour following the scheduled time of completion of the broadcast of a live sports...
76 FR 60500 - Advisory Committee on Immunization Practices (ACIP)
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... schedule; human papillomavirus vaccine; hepatitis B vaccine; meningococcal vaccines; influenza; 13-valent... subject to change as priorities dictate. Contact Person for More Information: Stephanie B. Thomas...
49 CFR 224.13 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Preemptive effect. 224.13 Section 224.13 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION... effect. Under 49 U.S.C. 20106, issuance of this part preempts any State law, rule, regulation, or order...
46 CFR 112.05-1 - Purpose; preemptive effect.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS General § 112.05-1 Purpose; preemptive effect. (a) The purpose of this part is to ensure a dependable, independent, and dedicated emergency power source with sufficient capacity to supply...
46 CFR 112.05-1 - Purpose; preemptive effect.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS General § 112.05-1 Purpose; preemptive effect. (a) The purpose of this part is to ensure a dependable, independent, and dedicated emergency power source with sufficient capacity to supply...
46 CFR 112.05-1 - Purpose; preemptive effect.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS General § 112.05-1 Purpose; preemptive effect. (a) The purpose of this part is to ensure a dependable, independent, and dedicated emergency power source with sufficient capacity to supply...
49 CFR 238.13 - Preemptive effect.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS General § 238.13 Preemptive effect. (a... necessary to eliminate or reduce an essentially local safety or security hazard; is not incompatible with a... commerce. (b) This part establishes Federal standards of care for railroad passenger equipment. This part...
49 CFR 238.13 - Preemptive effect.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION PASSENGER EQUIPMENT SAFETY STANDARDS General § 238.13 Preemptive effect. (a... necessary to eliminate or reduce an essentially local safety or security hazard; is not incompatible with a... commerce. (b) This part establishes Federal standards of care for railroad passenger equipment. This part...
CQPSO scheduling algorithm for heterogeneous multi-core DAG task model
NASA Astrophysics Data System (ADS)
Zhai, Wenzheng; Hu, Yue-Li; Ran, Feng
2017-07-01
Efficient task scheduling is critical to achieve high performance in a heterogeneous multi-core computing environment. The paper focuses on the heterogeneous multi-core directed acyclic graph (DAG) task model and proposes a novel task scheduling method based on an improved chaotic quantum-behaved particle swarm optimization (CQPSO) algorithm. A task priority scheduling list was built. A processor with minimum cumulative earliest finish time (EFT) was acted as the object of the first task assignment. The task precedence relationships were satisfied and the total execution time of all tasks was minimized. The experimental results show that the proposed algorithm has the advantage of optimization abilities, simple and feasible, fast convergence, and can be applied to the task scheduling optimization for other heterogeneous and distributed environment.
Time-critical multirate scheduling using contemporary real-time operating system services
NASA Technical Reports Server (NTRS)
Eckhardt, D. E., Jr.
1983-01-01
Although real-time operating systems provide many of the task control services necessary to process time-critical applications (i.e., applications with fixed, invariant deadlines), it may still be necessary to provide a scheduling algorithm at a level above the operating system in order to coordinate a set of synchronized, time-critical tasks executing at different cyclic rates. The scheduling requirements for such applications and develops scheduling algorithms using services provided by contemporary real-time operating systems.
76 FR 42143 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
..., 2011: Adjudicatory Matters. At times, changes in Commission priorities require alterations in the scheduling of meeting items. For further information and to ascertain what, if any, matters have been added...
48 CFR 49.206-3 - Submission of inventory disposal schedules.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Submission of inventory disposal schedules. 49.206-3 Section 49.206-3 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts...
Scheduling reinforcement about once a day.
Eckerman, D A
1999-04-01
A pigeon earned its daily food by pecking a key according to reinforcement schedules that produced food about once per day. Fixed-interval (FI), Fixed-time (FT), and various complex schedules were arranged to demonstrate the degree to which a scalloped pattern of responding remained. Pausing continued until about an hour before the reinforcer could be earned for FIs of 12, 24, and 48 h. Pausing was not as long for FIs of 18, 19, and 23 h. Pausing of about 24 h was seen for FI 36 h. FT 24 h produced continued responding but at a diminished frequency. The pattern of responding was strongly controlled by the schedule of reinforcement and seemed relatively independent of the cycle of human activity in the surrounding laboratory. Effects of added ratio contingencies and of signaling the availability of reinforcement in FT were also examined. Signaled FTs of 5 min-3 h produced more responding during the signal (autoshaping) than did FTs of 19 or 24 h.
Dawn Usage, Scheduling, and Governance Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Louis, S
2009-11-02
This document describes Dawn use, scheduling, and governance concerns. Users started running full-machine science runs in early April 2009 during the initial open shakedown period. Scheduling Dawn while in the Open Computing Facility (OCF) was controlled and coordinated via phone calls, emails, and a small number of controlled banks. With Dawn moving to the Secure Computing Facility (SCF) in fall of 2009, a more detailed scheduling and governance model is required. The three major objectives are: (1) Ensure Dawn resources are allocated on a program priority-driven basis; (2) Utilize Dawn resources on the job mixes for which they were intended;more » and (3) Minimize idle cycles through use of partitions, banks and proper job mix. The SCF workload for Dawn will be inherently different than Purple or BG/L, and therefore needs a different approach. Dawn's primary function is to permit adequate access for tri-lab code development in preparation for Sequoia, and in particular for weapons multi-physics codes in support of UQ. A second purpose is to provide time allocations for large-scale science runs and for UQ suite calculations to advance SSP program priorities. This proposed governance model will be the basis for initial time allocation of Dawn computing resources for the science and UQ workloads that merit priority on this class of resource, either because they cannot be reasonably attempted on any other resources due to size of problem, or because of the unavailability of sizable allocations on other ASC capability or capacity platforms. This proposed model intends to make the most effective use of Dawn as possible, but without being overly constrained by more formal proposal processes such as those now used for Purple CCCs.« less
Kobayashi, Shogo; Sano, Hideki; Mochizuki, Kazuhiro; Ohara, Yoshihiro; Takahashi, Nobuhisa; Ohto, Hitoshi; Kikuta, Atsushi
2017-09-01
Epstein-Barr virus-related post-transplantation lymphoproliferative disease (EBV-PTLD) is a serious complication in hematopoietic stem cell transplantation (HSCT) recipients. We conducted a retrospective study to investigate the incidence and potential risk factors for EBV reactivation and to assess the efficacy of the management of EBV reactivation with pre-emptive rituximab in children who had T-cell-replete haploidentical HSCT (TCR-haplo-SCT) with low-dose anti-thymocyte globulin (ATG). EBV-DNA level in peripheral blood (PB) was measured when suspected EBV reactivation were observed. When the EBV-DNA level in PB increased to >1,000 copies/10 6 peripheral blood mononuclear cells (PBMC), patients were pre-emptively treated with rituximab (375 mg/m 2 /dose). A total of 19 (50%) of 38 patients received rituximab infusion at a median time of 56 days after HSCT (range, 17-270 days). The median viral load at initiation of therapy was 2,900 copies/10 6 PBMC (range, 1,000-650 000). Pre-emptive therapy was started after a median of 2 days (range, 0-7 days). The median number of weekly treatment cycles was 2 (range, 1-3). None of the patients developed PTLD or other EBV-associated diseases. Pre-emptive rituximab therapy could be a useful strategy for EBV-PTLD in TCR-haplo-SCT recipients with low-dose ATG. © 2017 Japan Pediatric Society.
Scheduling Results for the THEMIS Observation Scheduling Tool
NASA Technical Reports Server (NTRS)
Mclaren, David; Rabideau, Gregg; Chien, Steve; Knight, Russell; Anwar, Sadaat; Mehall, Greg; Christensen, Philip
2011-01-01
We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.
Scheduling Real-Time Mixed-Criticality Jobs
NASA Astrophysics Data System (ADS)
Baruah, Sanjoy K.; Bonifaci, Vincenzo; D'Angelo, Gianlorenzo; Li, Haohan; Marchetti-Spaccamela, Alberto; Megow, Nicole; Stougie, Leen
Many safety-critical embedded systems are subject to certification requirements; some systems may be required to meet multiple sets of certification requirements, from different certification authorities. Certification requirements in such "mixed-criticality" systems give rise to interesting scheduling problems, that cannot be satisfactorily addressed using techniques from conventional scheduling theory. In this paper, we study a formal model for representing such mixed-criticality workloads. We demonstrate first the intractability of determining whether a system specified in this model can be scheduled to meet all its certification requirements, even for systems subject to two sets of certification requirements. Then we quantify, via the metric of processor speedup factor, the effectiveness of two techniques, reservation-based scheduling and priority-based scheduling, that are widely used in scheduling such mixed-criticality systems, showing that the latter of the two is superior to the former. We also show that the speedup factors are tight for these two techniques.
NASA Technical Reports Server (NTRS)
Moore, J. E.
1975-01-01
An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.
Reinforcer magnitude and demand under fixed-ratio schedules with domestic hens.
Grant, Amber A; Foster, T Mary; Temple, William; Jackson, Surrey; Kinloch, Jennifer; Poling, Alan
2014-03-01
This study compared three methods of normalizing demand functions to allow comparison of demand for different commodities and examined how varying reinforcer magnitudes affected these analyses. Hens responded under fixed-ratio schedules in 40-min sessions with response requirement doubling each session and with 2-s, 8-s, and 12-s access to wheat. Over the smaller fixed ratios overall response rates generally increased and were higher the shorter the magazine duration. The logarithms of the number of reinforcers obtained (consumption) and the fixed ratio (price) were well fitted by curvilinear demand functions (Hursh et al., 1988. Journal of the Experimental Analysis of Behavior 50, 419-440) that were inelastic (b negative) over small fixed-ratios. The fixed ratio with maximal response rate (Pmax) increased, and the rate of change of elasticity (a) and initial consumption (L) decreased with increased magazine duration. Normalizing consumption using measures of preference for various magazine durations (3-s vs. 3-s, 2-s vs. 8-s, and 2-s vs. 12-s), obtained using concurrent schedules, gave useful results as it removed the differences in L. Normalizing consumption and price (Hursh and Winger, 1995. Journal of the Experimental Analysis of Behavior 64, 373-384) unified the data functions as intended by that analysis. The exponential function (Hursh and Silberberg, 2008. Psychological Review, 115, 186-198) gave an essential value that increased (i.e., α decreased significantly) as magazine duration decreased. This was not as predicted, since α should be constant over variations in magazine duration, but is similar to previous findings using a similar procedure with different food qualities (hens) and food quantities (rats). Copyright © 2014 Elsevier B.V. All rights reserved.
Schell, Greggory J; Lavieri, Mariel S; Helm, Jonathan E; Liu, Xiang; Musch, David C; Van Oyen, Mark P; Stein, Joshua D
2014-08-01
To determine whether dynamic and personalized schedules of visual field (VF) testing and intraocular pressure (IOP) measurements result in an improvement in disease progression detection compared with fixed interval schedules for performing these tests when evaluating patients with open-angle glaucoma (OAG). Secondary analyses using longitudinal data from 2 randomized controlled trials. A total of 571 participants from the Advanced Glaucoma Intervention Study (AGIS) and the Collaborative Initial Glaucoma Treatment Study (CIGTS). Perimetric and tonometric data were obtained for AGIS and CIGTS trial participants and used to parameterize and validate a Kalman filter model. The Kalman filter updates knowledge about each participant's disease dynamics as additional VF tests and IOP measurements are obtained. After incorporating the most recent VF and IOP measurements, the model forecasts each participant's disease dynamics into the future and characterizes the forecasting error. To determine personalized schedules for future VF tests and IOP measurements, we developed an algorithm by combining the Kalman filter for state estimation with the predictive power of logistic regression to identify OAG progression. The algorithm was compared with 1-, 1.5-, and 2-year fixed interval schedules of obtaining VF and IOP measurements. Length of diagnostic delay in detecting OAG progression, efficiency of detecting progression, and number of VF and IOP measurements needed to assess for progression. Participants were followed in the AGIS and CIGTS trials for a mean (standard deviation) of 6.5 (2.8) years. Our forecasting model achieved a 29% increased efficiency in identifying OAG progression (P<0.0001) and detected OAG progression 57% sooner (reduced diagnostic delay) (P = 0.02) than following a fixed yearly monitoring schedule, without increasing the number of VF tests and IOP measurements required. The model performed well for patients with mild and advanced disease. The model performed significantly more testing of patients who exhibited OAG progression than nonprogressing patients (1.3 vs. 1.0 tests per year; P<0.0001). Use of dynamic and personalized testing schedules can enhance the efficiency of OAG progression detection and reduce diagnostic delay compared with yearly fixed monitoring intervals. If further validation studies confirm these findings, such algorithms may be able to greatly enhance OAG management. Copyright © 2014 American Academy of Ophthalmology. Published by Elsevier Inc. All rights reserved.
Improved Space Surveillance Network (SSN) Scheduling using Artificial Intelligence Techniques
NASA Astrophysics Data System (ADS)
Stottler, D.
There are close to 20,000 cataloged manmade objects in space, the large majority of which are not active, functioning satellites. These are tracked by phased array and mechanical radars and ground and space-based optical telescopes, collectively known as the Space Surveillance Network (SSN). A better SSN schedule of observations could, using exactly the same legacy sensor resources, improve space catalog accuracy through more complementary tracking, provide better responsiveness to real-time changes, better track small debris in low earth orbit (LEO) through efficient use of applicable sensors, efficiently track deep space (DS) frequent revisit objects, handle increased numbers of objects and new types of sensors, and take advantage of future improved communication and control to globally optimize the SSN schedule. We have developed a scheduling algorithm that takes as input the space catalog and the associated covariance matrices and produces a globally optimized schedule for each sensor site as to what objects to observe and when. This algorithm is able to schedule more observations with the same sensor resources and have those observations be more complementary, in terms of the precision with which each orbit metric is known, to produce a satellite observation schedule that, when executed, minimizes the covariances across the entire space object catalog. If used operationally, the results would be significantly increased accuracy of the space catalog with fewer lost objects with the same set of sensor resources. This approach inherently can also trade-off fewer high priority tasks against more lower-priority tasks, when there is benefit in doing so. Currently the project has completed a prototyping and feasibility study, using open source data on the SSN's sensors, that showed significant reduction in orbit metric covariances. The algorithm techniques and results will be discussed along with future directions for the research.
Ginsburg, Brett C; Lamb, Richard J
2014-03-01
Varenicline, a nicotinic partial agonist, selectively reduces ethanol (EtOH)- versus sucrose-maintained behavior when tested in separate groups, yet like the indirect agonist fluvoxamine, this selectively inverts when EtOH and food are concurrently available. Here, we extend these findings by examining varenicline and fluvoxamine effects under a multiple concurrent schedule where food and EtOH are concurrently available in different components: Component 1 where the food fixed-ratio was 25 and Component 2 where the food fixed-ratio was 75. The EtOH fixed-ratio was always 5. Food-maintained responding predominated in Component 1, while EtOH-maintained responding predominated in Component 2. In a second experiment, varenicline effects were assessed under a multiple schedule where food, then EtOH, then again food were available in separate 5-minute components with fixed-ratios of 5 for each reinforcement. In the multiple concurrent schedule, varenicline was more potent at reducing food- versus EtOH-maintained responding in both components and reduced EtOH-maintained responding more potently during Component 1 (when food was almost never earned) than in Component 2 (where food was often earned). Fluvoxamine was similarly potent at reducing food- and EtOH-maintained responding. Under the multiple schedule, varenicline, like fluvoxamine, more potently decreases EtOH- versus food maintained responding when only food or EtOH is available in separate components. These results demonstrate that selective effects on drug- versus alternative-maintained behavior depend on the schedule arrangement, and assays in which EtOH or an alternative is the only programmed reinforcement may overestimate the selectivity of treatments to decrease EtOH self-administration. Thus selective effects obtained under one assay may not generalize to another. Better understanding the behavioral mechanisms responsible for these results may help to guide pharmaco-therapeutic development for substance use disorders.
77 FR 39749 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... advertising in securities offerings conducted pursuant to Rule 506 of Regulation D under the Securities Act... Startups Act. At times, changes in Commission priorities require alterations in the scheduling of meeting...
Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter
Loganathan, Shyamala; Mukherjee, Saswati
2015-01-01
Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms. PMID:26473166
Job Scheduling with Efficient Resource Monitoring in Cloud Datacenter.
Loganathan, Shyamala; Mukherjee, Saswati
2015-01-01
Cloud computing is an on-demand computing model, which uses virtualization technology to provide cloud resources to users in the form of virtual machines through internet. Being an adaptable technology, cloud computing is an excellent alternative for organizations for forming their own private cloud. Since the resources are limited in these private clouds maximizing the utilization of resources and giving the guaranteed service for the user are the ultimate goal. For that, efficient scheduling is needed. This research reports on an efficient data structure for resource management and resource scheduling technique in a private cloud environment and discusses a cloud model. The proposed scheduling algorithm considers the types of jobs and the resource availability in its scheduling decision. Finally, we conducted simulations using CloudSim and compared our algorithm with other existing methods, like V-MCT and priority scheduling algorithms.
JPRS Report, Near East & South Asia, India
1991-09-04
effectively utilized. The national Scheduled Castes and Scheduled Tribes High priority will, therefore, be accorded to education. Finance and Development ...the Government’s reaction. Whatever is there was a sharp reduction in our foreign exchange banned or is obstructive is a negative development ...Unless I distribution system will be increased by 85 paise per kg find substantial improvement in tax compliance in the to Rs 6. 10 per kg with effect
An Adaptive Priority Tuning System for Optimized Local CPU Scheduling using BOINC Clients
NASA Astrophysics Data System (ADS)
Mnaouer, Adel B.; Ragoonath, Colin
2010-11-01
Volunteer Computing (VC) is a Distributed Computing model which utilizes idle CPU cycles from computing resources donated by volunteers who are connected through the Internet to form a very large-scale, loosely coupled High Performance Computing environment. Distributed Volunteer Computing environments such as the BOINC framework is concerned mainly with the efficient scheduling of the available resources to the applications which require them. The BOINC framework thus contains a number of scheduling policies/algorithms both on the server-side and on the client which work together to maximize the available resources and to provide a degree of QoS in an environment which is highly volatile. This paper focuses on the BOINC client and introduces an adaptive priority tuning client side middleware application which improves the execution times of Work Units (WUs) while maintaining an acceptable Maximum Response Time (MRT) for the end user. We have conducted extensive experimentation of the proposed system and the results show clear speedup of BOINC applications using our optimized middleware as opposed to running using the original BOINC client.
Hackenberg, Timothy D.; Hineline, Philip N.
1987-01-01
Disruption of ongoing appetitive behavior before and after daily avoidance sessions was examined. After baselines of appetitive responding were established under a fixed-interval 180-s schedule of food presentation, 4 rats were exposed to 40-min sessions of the appetitive schedule just prior to 100-min sessions of electric shock postponement, while another 4 rats received the 40-min appetitive sessions just following daily sessions of shock postponement. In all 8 subjects, fixed-interval response rates decreased relative to baseline levels, the effect being somewhat more pronounced when the avoidance sessions immediately followed. The disruption of fixed-interval responding was only partially reversed when avoidance sessions were discontinued. During the initial exposure to the avoidance sessions, patterns of responding under the fixed-interval schedule were differentially sensitive to disruption, with high baseline response rates generally more disturbed than low rates. These disruptions were not systematically related to changes in reinforcement frequency, which remained fairly high and invariant across all conditions of the experiment; they were also not systematically related to the response rates or to the shock rates of the adjacent avoidance sessions. The results, while qualitatively resembling patterns of conditioned suppression as typically studied, occurred on a greatly expanded time scale. As disruption of behavior extending over time, the present data suggest that some forms of conditioned suppression are perhaps best viewed within a larger temporal context. PMID:16812486
DOT National Transportation Integrated Search
2012-06-01
The mobility allowance shuttle transit (MAST) system is a hybrid transit system in which vehicles are : allowed to deviate from a fixed route to serve flexible demand. A mixed integer programming (MIP) : formulation for the static scheduling problem ...
48 CFR 2937.602 - Elements of performance-based contracting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... objectively measurable incentives (e.g., Firm-Fixed-Price, Fixed-Price-Incentive-Fee, or Cost-Plus-Incentive-Fee) is appropriate. However, when contractor performance (e.g., cost control, schedule, or quality/technical) is best evaluated subjectively using qualitative measures, a Cost-Plus-Award-Fee contract may be...
Preemptive living-donor kidney transplantation: clinical course and outcome.
el-Agroudy, Amgad E; Donia, Ahmed F; Bakr, Mohamed A; Foda, Mohamed A; Ghoneim, Mohamed A
2004-05-15
Dialysis is not only associated with morbidity, it is also expensive. In developing countries, preemptive renal transplantation (Tx) may be a cost-effective option, offering an additional benefit to conventional renal Tx. Between March 1976 and March 2001, 1,279 first living-donor Txs were performed in our center. The 82 patients (6.4%) who underwent Tx without prior dialysis were compared with 1,197 patients who had been dialyzed before Tx. The dialysis-dependent group received more blood transfusions (65% vs. 30%) before Tx. Actuarial graft and patient survival at 5 years was comparable in both groups (P =0.2 and P =0.8, respectively). The incidence of acute and chronic rejection was not different between the two groups. Mortality rate was also similar in the two groups. The main cause of death with a functioning graft was cardiovascular in the preemptive Tx group and chronic liver disease and infection in the control group. In the context of a developing country, preemptive Tx offers comparable patient and graft survival to conventional renal Tx and eliminates the complications, inconvenience, and cost of dialysis.
Real-time data collection in Linux: a case study.
Finney, S A
2001-05-01
Multiuser UNIX-like operating systems such as Linux are often considered unsuitable for real-time data collection because of the potential for indeterminate timing latencies resulting from preemptive scheduling. In this paper, Linux is shown to be fully adequate for precisely controlled programming with millisecond resolution or better. The Linux system calls that subserve such timing control are described and tested and then utilized in a MIDI-based program for tapping and music performance experiments. The timing of this program, including data input and output, is shown to be accurate at the millisecond level. This demonstrates that Linux, with proper programming, is suitable for real-time experiment software. In addition, the detailed description and test of both the operating system facilities and the application program itself may serve as a model for publicly documenting programming methods and software performance on other operating systems.
Priority coding for control room alarms
Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.
1994-01-01
Indicating the priority of a spatially fixed, activated alarm tile on an alarm tile array by a shape coding at the tile, and preferably using the same shape coding wherever the same alarm condition is indicated elsewhere in the control room. The status of an alarm tile can change automatically or by operator acknowledgement, but tones and/or flashing cues continue to provide status information to the operator.
Architectural impact of FDDI network on scheduling hard real-time traffic
NASA Technical Reports Server (NTRS)
Agrawal, Gopal; Chen, Baio; Zhao, Wei; Davari, Sadegh
1991-01-01
The architectural impact on guaranteeing synchronous message deadlines in FDDI (Fiber Distributed Data Interface) token ring networks is examined. The FDDI network does not have facility to support (global) priority arbitration which is a useful facility for scheduling hard real time activities. As a result, it was found that the worst case utilization of synchronous traffic in an FDDI network can be far less than that in a centralized single processor system. Nevertheless, it is proposed and analyzed that a scheduling method can guarantee deadlines of synchronous messages having traffic utilization up to 33 pct., the highest to date.
Yadav, Ghanshyam; Jain, Gaurav; Samprathi, Abhishek; Baghel, Annavi; Singh, Dinesh Kumar
2016-01-01
Background and Aims: Poorly managed acute postoperative pain may result in prolonged morbidity. Various pharmacotherapies have targeted this, but research on an ideal preemptive analgesic continues, taking into account drug-related side effects. Considering the better tolerability profile of tapentadol, we assessed its role as a preemptive analgesic in the reduction of postoperative analgesic requirements, after laparoscopic cholecystectomy. Material and Methods: In a prospective-double-blinded fashion, sixty patients posted for above surgery, were randomized to receive tablet tapentadol 75 mg (Group A) or starch tablets (Group B) orally, an hour before induction of general anesthesia. Perioperative analgesic requirement, time to first analgesia, pain, and sedation score were compared for first 24 h during the postoperative period and analyzed by one-way analysis of variance test. A P < 0.05 was considered significant. Results: Sixty patients were analyzed. The perioperative analgesic requirement was significantly lower in Group A. Verbal numerical score was significantly lower in Group A at the time point, immediately after shifting the patient to the postanesthesia care unit. Ramsay sedation scores were similar between the groups. No major side effects were observed except for nausea and vomiting in 26 cases (10 in Group A, 16 in Group B). Conclusion: Single preemptive oral dose of tapentadol (75 mg) is effective in reducing perioperative analgesic requirements and acute postoperative pain, without added side effects. It could be an appropriate preemptive analgesic, subjected to future trials concentrating upon its dose-response effects. PMID:28096581
2004-11-01
fixed schedule checkups and overhauls), Underway Replenishment (the goal being operation in sea states 3 and higher via technical improvements to...determine whether sufficient local resources are available to deal with current conditions. Scheduling Agent: Assists the Emergency Operations Bureau to...will commence per predefined schedule within 15 minutes) and subsequently alerts its subscribers that the rolling power blackout has commenced. The
Weather Impact on Airport Arrival Meter Fix Throughput
NASA Technical Reports Server (NTRS)
Wang, Yao
2017-01-01
Time-based flow management provides arrival aircraft schedules based on arrival airport conditions, airport capacity, required spacing, and weather conditions. In order to meet a scheduled time at which arrival aircraft can cross an airport arrival meter fix prior to entering the airport terminal airspace, air traffic controllers make regulations on air traffic. Severe weather may create an airport arrival bottleneck if one or more of airport arrival meter fixes are partially or completely blocked by the weather and the arrival demand has not been reduced accordingly. Under these conditions, aircraft are frequently being put in holding patterns until they can be rerouted. A model that predicts the weather impacted meter fix throughput may help air traffic controllers direct arrival flows into the airport more efficiently, minimizing arrival meter fix congestion. This paper presents an analysis of air traffic flows across arrival meter fixes at the Newark Liberty International Airport (EWR). Several scenarios of weather impacted EWR arrival fix flows are described. Furthermore, multiple linear regression and regression tree ensemble learning approaches for translating multiple sector Weather Impacted Traffic Indexes (WITI) to EWR arrival meter fix throughputs are examined. These weather translation models are developed and validated using the EWR arrival flight and weather data for the period of April-September in 2014. This study also compares the performance of the regression tree ensemble with traditional multiple linear regression models for estimating the weather impacted throughputs at each of the EWR arrival meter fixes. For all meter fixes investigated, the results from the regression tree ensemble weather translation models show a stronger correlation between model outputs and observed meter fix throughputs than that produced from multiple linear regression method.
Yeh, C C; Ho, S T; Kong, S S; Wu, C T; Wong, C S
2000-12-01
Previous studies have shown that dextromethorphan (DM), a N-methyl-D-aspartate (NMDA) receptor antagonist, produces a preemptive analgesic effect on post-operative pain. The aim of this study was to further examine the preemptive analgesic effect of intramuscular (i.m.) DM injection on unilateral total knee replacement (TKR). Sixty-four ASA I-III patients scheduled for unilateral TKR surgery were randomly allocated into three groups in a prospective double-blind manner. All patients received epidural anesthesia without any premedication. An initial bolus dose of 2% lidocaine (15-20 mL) followed by a maintenance dose of 8-10 mL/h was decided. Fentanyl (1.5 micrograms/kg) and diazepam (2 mg) were given i.v. before epidural catheter insertion. The epidural catheter was placed via the L2-L3 or L3-L4 interspace and advanced for 5 cm cephalad [corrected]. Patients received i.m. injection of 20 mg chlorpheniramine (CPM) before surgery as control (group C, n = 22). For the study groups, patients were given an i.m. injection containing 40 mg DM and 20 mg CPM, before (group B, n = 22) or after surgery (group A, n = 20), respectively. Postoperation, patients received intravenous morphine by means of a patient controlled analgesia (PCA) device for pain relief. The time to the first pull of PCA trigger, morphine consumption, worse pain scores (resting and incidental), and analgesics related side effects were recorded at 1, 2, 4, 8, 24, 48 and 72 h after surgery. The time from the end of operation to the first PCA trigger were 31.2 +/- 5.2 min in group C, 67.3 +/- 11.1 min in group B (P < 0.05, compared with group C) and 61.8 +/- 7.2 min in group A (P < 0.05, compared with group C) respectively. The relevant pain score at resting, observed at the 8 h postoperatively was respectively 4.2 +/- 0.1 in group C, 3.7 +/- 0.2 in group B (P < 0.05, compared with group C) and 3.4 +/- 0.2 in group A (P < 0.05, compared with group C); and at the 24 h was 3.1 +/- 0.2 in group C, 2.4 +/- 0.2 in group B (P < 0.05, compared with group C) and 2.5 +/- 0.1 in group A (P < 0.05, compared with group C) respectively. There were no significant differences in actual morphine delivery and frequency of PCA triggering at all time among the three groups. Moreover, there was also no significant statistic difference in morphine-associated side effects among the three groups. In the present study, we failed to observe any preemptive analgesic effect of DM (40 mg, i.m.) on postoperative pain in patients who received TKR under epidural anesthesia, however, DM given either before or after surgery augmented other analgesic (morphine) to offer a better pain relief.
A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites
NASA Technical Reports Server (NTRS)
Globus, Al; Crawford, James; Lohn, Jason; Pryor, Anna
2003-01-01
Earth observing satellite (EOS) scheduling is a complex real-world domain representative of a broad class of over-subscription scheduling problems. Over-subscription problems are those where requests for a facility exceed its capacity. These problems arise in a wide variety of NASA and terrestrial domains and are .XI important class of scheduling problems because such facilities often represent large capital investments. We have run experiments comparing multiple variants of the genetic algorithm, hill climbing, simulated annealing, squeaky wheel optimization and iterated sampling on two variants of a realistically-sized model of the EOS scheduling problem. These are implemented as permutation-based methods; methods that search in the space of priority orderings of observation requests and evaluate each permutation by using it to drive a greedy scheduler. Simulated annealing performs best and random mutation operators outperform our squeaky (more intelligent) operator. Furthermore, taking smaller steps towards the end of the search improves performance.
Clinical Nursing Records Study
1991-08-01
In-depth assessment of current AMEDD nursing documentation system used in fixed facilities; 2 - 4) development, implementation and assessment of...used in fixed facilities to: a) identify system problems; b) identify potential solutions to problems; c) set priorities fc problem resolution; d...enhance compatibility between any " hard copy" forms the group might develop and automation requirements. Discussions were also held with personnel from
Elholm, Bjarne; Larsen, Klaus; Hornnes, Nete; Zierau, Finn; Becker, Ulrik
2011-01-01
To investigate whether, in the treatment with chlordiazepoxide for outpatient alcohol withdrawal, there are advantages of symptom-triggered self-medication over a fixed-schedule regimen. A randomized controlled trial in outpatient clinics for people suffering from alcohol dependence (AD) and alcohol-related problems; 165 adult patients in an outpatient setting in a specialized alcohol treatment unit were randomized 1:1 to either a symptom-triggered self-medication or tapered dose, using chlordiazepoxide. Alcohol withdrawal symptoms, amount of medication, duration of symptoms, time to relapse and patient satisfaction were measured. Patients assessed their symptoms using the Short Alcohol Withdrawal Scale (SAWS). Patient satisfaction was monitored by the Diabetes Treatment Satisfaction Questionnaire. We used the Well-Being Index and the European addiction severity index for the 1-year follow-up. We found no differences in the quantity of medication consumed, time to relapse, well being or treatment satisfaction. Symptom-triggered self-medication was as safe as fixed-schedule medication in treating outpatients with AD and mild to moderate symptoms of AWS. The SAWS is a powerful monitoring tool, because it is brief and permits the subject to log the withdrawal symptoms.
Li, Mi; McMillan, Donald E
2003-08-22
The experiments showed that sequential drug discriminations can be learned and retained under a fixed-interval (FI) schedule for more than 18 months without additional training under a complex three-choice procedure. Pigeons were trained to discriminate among 5 mg/kg pentobarbital, 2 mg/kg D-amphetamine, and saline. After responding stabilized, dose-response curves were determined for other drugs. Subsequently, pentobarbital was replaced with 5 mg/kg morphine as a training drug, and D-amphetamine was replaced with 30 mg/kg caffeine. After the pigeons learned these new discriminations, dose-response curves were redetermined. Initially, chlordiazepoxide substituted for pentobarbital, cocaine substituted for D-amphetamine, and nicotine partially substituted for D-amphetamine. Morphine, Delta9-tetrahydrocannabinol, and caffeine did not substitute for either drug. After retraining with morphine and caffeine, responding occurred on the pentobarbital/morphine key after pentobarbital, chlordiazepoxide and morphine and on the D-amphetamine/caffeine key after D-amphetamine, cocaine and caffeine. After nicotine and Delta9-tetrahyrdocannabinol, responding occurred on the saline key. These data show that drug discriminations learned under fixed-interval schedules are retained for long time periods, even when discrimination training with other drugs occurs during the retention period.
Luczynski, Kevin C; Hanley, Gregory P
2014-01-01
Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.
ERIC Educational Resources Information Center
Dowling, Carey Bernini; Slep, Amy M. Smith; O'Leary, Susan G.
2009-01-01
The relations among preemptive parenting (i.e., a hypothetical set of strategies parents can use prior to child misbehavior that serves to prevent or avoid undesirable child behaviors), dysfunctional discipline, and praise were examined. Forty mother-toddler (M age = 26.15 months, SD = 5.60) dyads interacted in a standard laboratory task designed…
Human Schedule Performance, Protocol Analysis, and the "Silent Dog" Methodology
ERIC Educational Resources Information Center
Cabello, Francisco; Luciano, Carmen; Gomez, Inmaculada; Barnes-Holmes, Dermot
2004-01-01
The purpose of the current experiment was to investigate the role of private verbal behavior on the operant performances of human adults, using a protocol analysis procedure with additional methodological controls (the "silent dog" method). Twelve subjects were exposed to fixed ratio 8 and differential reinforcement of low rate 3-s schedules. For…
Course Scheduling to Find the Minimum Cost Set of Facilities Required.
ERIC Educational Resources Information Center
Seccatore, Luis A.
The problem of determining the quantity of classroom, laboratories and instructors to train sections of students attending numerous distinct courses in a school such as the Fleet Ballistic Missile School is considered. A procedure is developed for determining feasible schedules in order to graduate a fixed number of trainees over time while…
Effectiveness of Time-Based Attention Schedules on Students in Inclusive Classrooms in Turkey
ERIC Educational Resources Information Center
Sazak Pinar, Elif
2015-01-01
This study examines the effectiveness of fixed-time (FT) and variable-time (VT) schedules and attention on the problem behaviors and on-task behaviors of students with and without intellectual disabilities in inclusive classrooms in Turkey. Three second-grade students with intellectual disabilities, three students without intellectual…
Environmental damage schedules: community judgments of importance and assessments of losses
Ratana Chuenpagdee; Jack L. Knetsch; Thomas C. Brown
2001-01-01
Available methods of valuing environmental changes are often limited in their applicability to current issues such as damage assessment and implementing regulatory controls, or may otherwise not provide reliable readings of community preferences. An alternative is to base decisions on predetermined fixed schedules of sanctions, restrictions, damage awards, and other...
Improving collection efficiency through remote monitoring of charity assets.
McLeod, Fraser; Erdogan, Gunes; Cherrett, Tom; Bektas, Tolga; Davies, Nigel; Shingleton, Duncan; Speed, Chris; Dickinson, Janet; Norgate, Sarah
2014-02-01
Collection costs associated with servicing a major UK charity's donation banks and collecting unsold goods from their retail shops can account for up to 20% of the overall income gained. Bank and shop collections are commingled and are typically made on fixed days of the week irrespective of the amounts of materials waiting to be collected. Using collection records from a major UK charity, this paper considers what vehicle routing and scheduling benefits could accrue if bank and shop servicing requirements were monitored, the former using remote sensing technology to allow more proactive collection scheduling. A vehicle routing and scheduling algorithm employing tabu search methods was developed, and suggested time and distance savings of up to 30% over the current fixed schedules when a minimum bank and shop fill level of between 50% and 60% was used as a collection trigger. For the case study investigated, this led to a potential revenue gain of 5% for the charity and estimated CO2 savings of around 0.5 tonnes per week across the fleet of six heterogeneous vehicles. Copyright © 2013 Elsevier Ltd. All rights reserved.
Zhu, Jianping; Tao, Zhengsu; Lv, Chunfeng
2012-01-01
Studies of the IEEE 802.15.4 Carrier Sense Multiple Access with Collision Avoidance (CSMA/CA) scheme have been received considerable attention recently, with most of these studies focusing on homogeneous or saturated traffic. Two novel transmission schemes—OSTS/BSTS (One Service a Time Scheme/Bulk Service a Time Scheme)—are proposed in this paper to improve the behaviors of time-critical buffered networks with heterogeneous unsaturated traffic. First, we propose a model which contains two modified semi-Markov chains and a macro-Markov chain combined with the theory of M/G/1/K queues to evaluate the characteristics of these two improved CSMA/CA schemes, in which traffic arrivals and accessing packets are bestowed with non-preemptive priority over each other, instead of prioritization. Then, throughput, packet delay and energy consumption of unsaturated, unacknowledged IEEE 802.15.4 beacon-enabled networks are predicted based on the overall point of view which takes the dependent interactions of different types of nodes into account. Moreover, performance comparisons of these two schemes with other non-priority schemes are also proposed. Analysis and simulation results show that delay and fairness of our schemes are superior to those of other schemes, while throughput and energy efficiency are superior to others in more heterogeneous situations. Comprehensive simulations demonstrate that the analysis results of these models match well with the simulation results. PMID:22666076
Zhu, Jianping; Tao, Zhengsu; Lv, Chunfeng
2012-01-01
Studies of the IEEE 802.15.4 Carrier Sense Multiple Access with Collision Avoidance (CSMA/CA) scheme have been received considerable attention recently, with most of these studies focusing on homogeneous or saturated traffic. Two novel transmission schemes-OSTS/BSTS (One Service a Time Scheme/Bulk Service a Time Scheme)-are proposed in this paper to improve the behaviors of time-critical buffered networks with heterogeneous unsaturated traffic. First, we propose a model which contains two modified semi-Markov chains and a macro-Markov chain combined with the theory of M/G/1/K queues to evaluate the characteristics of these two improved CSMA/CA schemes, in which traffic arrivals and accessing packets are bestowed with non-preemptive priority over each other, instead of prioritization. Then, throughput, packet delay and energy consumption of unsaturated, unacknowledged IEEE 802.15.4 beacon-enabled networks are predicted based on the overall point of view which takes the dependent interactions of different types of nodes into account. Moreover, performance comparisons of these two schemes with other non-priority schemes are also proposed. Analysis and simulation results show that delay and fairness of our schemes are superior to those of other schemes, while throughput and energy efficiency are superior to others in more heterogeneous situations. Comprehensive simulations demonstrate that the analysis results of these models match well with the simulation results.
Design and control of a vertical takeoff and landing fixed-wing unmanned aerial vehicle
NASA Astrophysics Data System (ADS)
Malang, Yasir
With the goal of extending capabilities of multi-rotor unmanned aerial vehicles (UAVs) for wetland conservation missions, a novel hybrid aircraft design consisting of four tilting rotors and a fixed wing is designed and built. The tilting rotors and nonlinear aerodynamic effects introduce a control challenge for autonomous flight, and the research focus is to develop and validate an autonomous transition flight controller. The overall controller structure consists of separate cascaded Proportional Integral Derivative (PID) controllers whose gains are scheduled according to the rotors' tilt angle. A control mechanism effectiveness factor is used to mix the multi-rotor and fixed-wing control actuators during transition. A nonlinear flight dynamics model is created and transition stability is shown through MATLAB simulations, which proves gain-scheduled control is a good fit for tilt-rotor aircraft. Experiments carried out using the prototype UAV validate simulation results for VTOL and tilted-rotor flight.
Hypocretin/orexin antagonists decrease cocaine self-administration by female rhesus monkeys.
Foltin, Richard W; Evans, Suzette M
2018-07-01
The hypocretin/orexin system is involved in regulating arousal, and much recent work demonstrates that decreasing hypocretin receptor-1 (HCRTr1) activity using antagonists decreases appetitive behavior, including stimulant drug self-administration and reinstatement. The present study determined the effects of hypocretin-1 and HCRTr1 antagonists on responding reinforced by intravenous (i.v.) cocaine self-administration (0.0125 - 0.05 mg/kg/infusion) in 5 female rhesus monkeys. Responding was examined using 3 schedules of reinforcement: 1) a Fixed interval 1 min, Fixed ratio 10 Chain schedule [FI 1-min (FR10:S)], 2) a Progressive Ratio (PR) schedule, and 3) a cocaine vs. candy. Choice schedule: the HCRTr1 antagonist SB-334867 (8-24 mg/kg, i.m.) decreased cocaine taking under the Chain schedule and PR schedule in all 5 monkeys and in 4 of the 5 monkeys under the Choice schedule. d- Amphetamine (0.06 - 0.25 mg/kg, i.m.), tested as a control manipulation, decreased cocaine taking in all 5 monkeys under the Chain schedule. The peptide hypocretin-1 (0.072 mg/kg, i.v.) increased cocaine taking in the monkeys with low rates of cocaine taking under the Chain (3/4) and Choice (4/5) schedules. Reinstatement of extinguished cocaine responding following response-independent delivery of a large dose of cocaine (0.3 mg/kg) was attenuated in 3 of the 5 monkeys by the HCRTr1 antagonist SB-334867. These data expand upon work accomplished in predominantly male rodents suggesting that the hypocretin system modulates the response to appetitive stimuli. A better understanding of this system offers promise as a novel approach in medication development for appetitive disorders. Copyright © 2018 Elsevier B.V. All rights reserved.
Enhanced round robin CPU scheduling with burst time based time quantum
NASA Astrophysics Data System (ADS)
Indusree, J. R.; Prabadevi, B.
2017-11-01
Process scheduling is a very important functionality of Operating system. The main-known process-scheduling algorithms are First Come First Serve (FCFS) algorithm, Round Robin (RR) algorithm, Priority scheduling algorithm and Shortest Job First (SJF) algorithm. Compared to its peers, Round Robin (RR) algorithm has the advantage that it gives fair share of CPU to the processes which are already in the ready-queue. The effectiveness of the RR algorithm greatly depends on chosen time quantum value. Through this research paper, we are proposing an enhanced algorithm called Enhanced Round Robin with Burst-time based Time Quantum (ERRBTQ) process scheduling algorithm which calculates time quantum as per the burst-time of processes already in ready queue. The experimental results and analysis of ERRBTQ algorithm clearly indicates the improved performance when compared with conventional RR and its variants.
Comparison of OPC job prioritization schemes to generate data for mask manufacturing
NASA Astrophysics Data System (ADS)
Lewis, Travis; Veeraraghavan, Vijay; Jantzen, Kenneth; Kim, Stephen; Park, Minyoung; Russell, Gordon; Simmons, Mark
2015-03-01
Delivering mask ready OPC corrected data to the mask shop on-time is critical for a foundry to meet the cycle time commitment for a new product. With current OPC compute resource sharing technology, different job scheduling algorithms are possible, such as, priority based resource allocation and fair share resource allocation. In order to maximize computer cluster efficiency, minimize the cost of the data processing and deliver data on schedule, the trade-offs of each scheduling algorithm need to be understood. Using actual production jobs, each of the scheduling algorithms will be tested in a production tape-out environment. Each scheduling algorithm will be judged on its ability to deliver data on schedule and the trade-offs associated with each method will be analyzed. It is now possible to introduce advance scheduling algorithms to the OPC data processing environment to meet the goals of on-time delivery of mask ready OPC data while maximizing efficiency and reducing cost.
Xu, Zhongwei; Zhang, Hua; Luo, Jiao; Zhou, Aiguo; Zhang, Jian
2017-09-01
This study was aimed to evaluate the efficacy of preemptive analgesia (PA) by using celecoxib combined with low-dose tramadol/acetaminophen (tramadol/APAP) in treating post-operative pain of patients undergoing unilateral total knee arthroplasty (TKA). A total of 132 patients scheduled for TKA were included in this study. Three-day pre-operative medication was administrated in PA group with subsequent effective intra- and post-operative multimodal analgesia, while control patients received multimodal analgesia without PA. Visual analog scale (VAS) was utilized to assess the pain intensity at rest and during movement. VAS scores of participants were recorded 3 days before surgery, 1 day, 3 days, 1 week, 3 weeks, 6 weeks, 3 months, 6 months, and 12 months postoperatively. Moreover, the length of hospital stay, expense of hospitalization, C-reactive protein (CRP) values during hospitalization, and complications during medication were also recorded. PA showed superiority over control at 3 weeks (P = 0.013) and 6 weeks (P = 0.046) in resting pain, and 1 week (P = 0.015), 3 weeks (P = 0.003), 6 weeks (P = 0.003) and 3 months (P = 0.012) postoperatively in movement pain. There was no statistically significant difference in the length of hospital stay, total expense, CRP values, as well as complications. Based on satisfactory intra- and post-operative analgesia, PA by 3-day administration of celecoxib and low-dose tramadol/APAP might be an effective and safe therapy regarding patients undergoing TKA in terms of alleviating post-operative pain.
Setting conservation priorities.
Wilson, Kerrie A; Carwardine, Josie; Possingham, Hugh P
2009-04-01
A generic framework for setting conservation priorities based on the principles of classic decision theory is provided. This framework encapsulates the key elements of any problem, including the objective, the constraints, and knowledge of the system. Within the context of this framework the broad array of approaches for setting conservation priorities are reviewed. While some approaches prioritize assets or locations for conservation investment, it is concluded here that prioritization is incomplete without consideration of the conservation actions required to conserve the assets at particular locations. The challenges associated with prioritizing investments through time in the face of threats (and also spatially and temporally heterogeneous costs) can be aided by proper problem definition. Using the authors' general framework for setting conservation priorities, multiple criteria can be rationally integrated and where, how, and when to invest conservation resources can be scheduled. Trade-offs are unavoidable in priority setting when there are multiple considerations, and budgets are almost always finite. The authors discuss how trade-offs, risks, uncertainty, feedbacks, and learning can be explicitly evaluated within their generic framework for setting conservation priorities. Finally, they suggest ways that current priority-setting approaches may be improved.
Controle du vol longitudinal d'un avion civil avec satisfaction de qualiies de manoeuvrabilite
NASA Astrophysics Data System (ADS)
Saussie, David Alexandre
2010-03-01
Fulfilling handling qualities still remains a challenging problem during flight control design. These criteria of different nature are derived from a wide experience based upon flight tests and data analysis, and they have to be considered if one expects a good behaviour of the aircraft. The goal of this thesis is to develop synthesis methods able to satisfy these criteria with fixed classical architectures imposed by the manufacturer or with a new flight control architecture. This is applied to the longitudinal flight model of a Bombardier Inc. business jet aircraft, namely the Challenger 604. A first step of our work consists in compiling the most commonly used handling qualities in order to compare them. A special attention is devoted to the dropback criterion for which theoretical analysis leads us to establish a practical formulation for synthesis purpose. Moreover, the comparison of the criteria through a reference model highlighted dominant criteria that, once satisfied, ensure that other ones are satisfied too. Consequently, we are able to consider the fulfillment of these criteria in the fixed control architecture framework. Guardian maps (Saydy et al., 1990) are then considered to handle the problem. Initially for robustness study, they are integrated in various algorithms for controller synthesis. Incidently, this fixed architecture problem is similar to the static output feedback stabilization problem and reduced-order controller synthesis. Algorithms performing stabilization and pole assignment in a specific region of the complex plane are then proposed. Afterwards, they are extended to handle the gain-scheduling problem. The controller is then scheduled through the entire flight envelope with respect to scheduling parameters. Thereafter, the fixed architecture is put aside while only conserving the same output signals. The main idea is to use Hinfinity synthesis to obtain an initial controller satisfying handling qualities thanks to reference model pairing and robust versus mass and center of gravity variations. Using robust modal control (Magni, 2002), we are able to reduce substantially the controller order and to structure it in order to come close to a classical architecture. An auto-scheduling method finally allows us to schedule the controller with respect to scheduling parameters. Two different paths are used to solve the same problem; each one exhibits its own advantages and disadvantages.
Penrod, Becky; Wallace, Michele D; Dyer, Edwin J
2008-01-01
Previous research has suggested that the availability of high-preference stimuli may override the reinforcing efficacy of concurrently available low-preference stimuli under relatively low schedule requirements (e.g., fixed-ratio 1 schedule). It is unknown if similar effects would be obtained under higher schedule requirements. Thus, the current study compared high-preference and low-preference reinforcers under progressively increasing schedule requirements. Results for 3 of the 4 participants indicated that high-preference stimuli maintained responding under higher schedule requirements relative to low-preference stimuli. For 1 participant, high-preference and low-preference stimuli were demonstrated to be equally effective reinforcers under increasing schedule requirements. Implications with respect to rate of performance and response patterns are discussed.
29 CFR 778.304 - Amounts deducted from cash wages-general.
Code of Federal Regulations, 2010 CFR
2010-07-01
... dues) or required by law (such as taxes and garnishments). (4) Reductions in a fixed salary paid for a fixed workweek in weeks in which the employee fails to work the full schedule. (5) Deductions for... 778.304 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... Schedule of Timeframes, and Fee Structure in the GSD Rules. II. Self-Regulatory Organization's Statement of...-Regulatory Organizations; The Fixed Income Clearing Corporation; Notice of Filing and Immediate Effectiveness... Timeframes, and Fee Structure in the GSD Rules October 12, 2011. Pursuant to Section 19(b)(1) of the...
Hosseini-Moghaddam, Seyed M; Chaparro, Cecilia; Luong, Me-Linh; Azad, Sassan; Singer, Lianne G; Mazzulli, Tony; Rotstein, Coleman; Keshavjee, Shaf; Husain, Shahid
2015-11-01
Invasive pulmonary aspergillosis (IPA) is a significant complication after lung transplantation. However, the risk factors for IPA in patients colonized with Aspergillus species, and the effectiveness of culture-directed preemptive treatment, are not well known. We studied 328 lung transplant recipients, from January 2006 to July 2009, with 1-year follow-up. Risk factors and effectiveness of culture-directed preemptive treatment were evaluated via a Cox-proportional hazard model. Seventy-one recipients (21.6%) developed invasive fungal infections, including 29 patients (8.8%) with IPA. Only 48.3% (14/29) of patients with IPA had pretransplantation or posttransplantation airway colonization with Aspergillus spp. In the Cox-proportional hazard model, treatment with rabbit antithymocyte globulin was significantly associated with posttransplant IPA in patients with Aspergillus colonization (hazards ratio, 4.25; 95% confidence interval, 1.09-16.6). Preemptive antifungal treatment for 3 months was significantly associated with a lower rate of IPA (0% [0/36] vs 18% [14/77]; P = 0.003, odds ratio, 0.8; 95% confidence interval, 0.7-0.9) but did not impact mortality. Our data suggest that almost half the cases of IPA occurred in patients without pretransplantation or posttransplantation airway colonization with Aspergillus spp. Among patients with Aspergillus colonization, use of rabbit antithymocyte globulin was associated with 4-fold risk of subsequent development of IPA. Invasive pulmonary aspergillosis was an independent risk factor for 1-year mortality. Use of preemptive antifungal treatment for 3 months may be associated with significant reduction of IPA without influencing mortality.
Haussmann, Ursula; Fischer, Joachim; Eber, Stefan; Scherer, Franziska; Seger, Reinhard; Gungor, Tayfun
2006-06-01
Hepatic veno-occlusive disease (VOD) remains a serious complication after hematopoietic stem cell transplantation (HSCT). Based on a protective effect of antithrombin III (ATIII) on endothelial cells, we assessed the incidence of VOD after pre-emptive ATIII replacement and the outcome of VOD after combined high dose defibrotide (DF) and ATIII therapy. This prospective case series comprised two phases. In the first phase 71 children did not receive any specific VOD prophylaxis or therapy (controls). In the second phase 91 children were given pre-emptive ATIII replacement in case of decreased ATIII activity (< or =70%). If VOD was diagnosed clinically (according to modified Seattle criteria), high dose defibrotide (60 mg/day) and ATIII replacement therapy were combined. The severity of VOD was determined according to the degree of multiple organ dysfunction. The incidence of VOD was similar in both groups (13/71, 18% vs. 14/91, 15%). All 14 patients in the second group who developed VOD showed decreased ATIII activity not more than 1 day prior to the clinical diagnosis of VOD. The resulting short duration of pre-emptive ATIII therapy failed to prevent VOD (OR 0.96). None of the patients (n=72) maintaining normal ATIII levels developed VOD. All 14 patients with VOD who received combined therapy achieved complete remission and 93 % (13/14) survived until day +100, compared to six survivors (46%) in the first group. Pre-emptive ATIII administration did not alter the incidence of VOD. Combination treatment with ATIII and defibrotide was safe and yielded excellent remission and survival rates.
Preemptive application of QX-314 attenuates trigeminal neuropathic mechanical allodynia in rats.
Yoon, Jeong-Ho; Son, Jo-Young; Kim, Min-Ji; Kang, Song-Hee; Ju, Jin-Sook; Bae, Yong-Chul; Ahn, Dong-Kuk
2018-05-01
The aim of the present study was to examine the effects of preemptive analgesia on the development of trigeminal neuropathic pain. For this purpose, mechanical allodynia was evaluated in male Sprague-Dawley rats using chronic constriction injury of the infraorbital nerve (CCI-ION) and perineural application of 2% QX-314 to the infraorbital nerve. CCI-ION produced severe mechanical allodynia, which was maintained until postoperative day (POD) 30. An immediate single application of 2% QX-314 to the infraorbital nerve following CCI-ION significantly reduced neuropathic mechanical allodynia. Immediate double application of QX-314 produced a greater attenuation of mechanical allodynia than a single application of QX-314. Immediate double application of 2% QX-314 reduced the CCI-ION-induced upregulation of GFAP and p-p38 expression in the trigeminal ganglion. The upregulated p-p38 expression was co-localized with NeuN, a neuronal cell marker. We also investigated the role of voltage-gated sodium channels (Navs) in the antinociception produced by preemptive application of QX-314 through analysis of the changes in Nav expression in the trigeminal ganglion following CCI-ION. Preemptive application of QX-314 significantly reduced the upregulation of Nav1.3, 1.7, and 1.9 produced by CCI-ION. These results suggest that long-lasting blockade of the transmission of pain signaling inhibits the development of neuropathic pain through the regulation of Nav isoform expression in the trigeminal ganglion. Importantly, these results provide a potential preemptive therapeutic strategy for the treatment of neuropathic pain after nerve injury.
Postoperative pain and preemptive local anesthetic infiltration in hallux valgus surgery.
Gądek, Artur; Liszka, Henryk; Wordliczek, Jerzy
2015-03-01
Several techniques of anesthesia are used in foot surgery. Preemptive analgesia helps to prevent the development of hypersensitivity in the perioperative period. The aim of our study was to assess the role of preemptive local anesthetic infiltration and postoperative pain after hallux valgus surgery. We evaluated 118 patients who underwent modified chevron and mini-invasive Mitchell-Kramer bunionectomy of the first distal metatarsal. After spinal anesthesia each patient randomly received an infiltration of local anesthetic or the same amount of normal saline 10 minutes before the skin incision. We measured the intensity of pain 4, 8, 12, 16, 24, and 72 hours after the release of the tourniquet using a visual analogue scale (VAS). Rescue analgesia and all other side effects were noted. Preemptive analgesia resulted in less pain during the first 24 hours after surgery. The decrease of VAS score was significantly lower in the study group during all the short postoperative periods measured. The rescue analgesia was administered in 11.9% of patients in the injected group and 42.4% in the placebo group (P < .05). In the injected group we did not observe significant difference in VAS score between patients post-chevron and miniinvasive Mitchell-Kramer osteotomy of the first distal metatarsal. No systemic adverse effects were noted. One persistent injury of dorsomedial cutaneous nerve was observed. Preemptive local anesthetic infiltration was an efficient and safe method to reduce postoperative pain after hallux valgus surgery. The analgesic effect was satisfactory in both traditional and minimally invasive techniques. © The Author(s) 2014.
Doing more with less - The new way of exploring the solar system
NASA Technical Reports Server (NTRS)
Ridenoure, Rex
1992-01-01
Exploration of the solar system is considered in the light of existing economic factors and scientific priorities, and a general blueprint for an exploration strategy is set forth. Attention is given to mission costs, typical schedules, and the scientific findings of typical projects which create the need for collaboration and diversification in mission development. The combined technologies and cooperative efforts of several small organizations can lead to missions with short schedules and low costs.
Doing more with less - The new way of exploring the solar system
NASA Astrophysics Data System (ADS)
Ridenoure, Rex
1992-08-01
Exploration of the solar system is considered in the light of existing economic factors and scientific priorities, and a general blueprint for an exploration strategy is set forth. Attention is given to mission costs, typical schedules, and the scientific findings of typical projects which create the need for collaboration and diversification in mission development. The combined technologies and cooperative efforts of several small organizations can lead to missions with short schedules and low costs.
Preemptive Striking in Individual and Group Conflict.
Mifune, Nobuhiro; Hizen, Yoichi; Kamijo, Yoshio; Okano, Yoshitaka
2016-01-01
In this study, we conducted a laboratory experiment to assess preemptive striking by and towards individuals or groups. In the framework of a preemptive strike game, we set the following four conditions: one person faced another person, one person faced a three-person group, a three-person group faced an individual, and a three-person group faced another three-person group. Previous studies have revealed that greed is activated when participants belong to a group, while fear is activated when participants interact with a group, and further, that attacking behaviors in the preemptive strike game are driven by fear. These observations led to a hypothesis that high attack rates would be realized when participants interact with a group, regardless of whether the participants make decisions as individuals or a group. The results of our experiment, however, rejected this hypothesis. Among the four conditions, the attack rate was highest when a three-person group faced an individual. As possible reasons for our observation, we discuss the potential threat stemming from the imbalance in the effectiveness of attack between individuals and groups, and the (incorrect) belief by groups that single individuals would be more likely to attack out of fear.
Preemptive Striking in Individual and Group Conflict
Mifune, Nobuhiro; Hizen, Yoichi; Kamijo, Yoshio; Okano, Yoshitaka
2016-01-01
In this study, we conducted a laboratory experiment to assess preemptive striking by and towards individuals or groups. In the framework of a preemptive strike game, we set the following four conditions: one person faced another person, one person faced a three-person group, a three-person group faced an individual, and a three-person group faced another three-person group. Previous studies have revealed that greed is activated when participants belong to a group, while fear is activated when participants interact with a group, and further, that attacking behaviors in the preemptive strike game are driven by fear. These observations led to a hypothesis that high attack rates would be realized when participants interact with a group, regardless of whether the participants make decisions as individuals or a group. The results of our experiment, however, rejected this hypothesis. Among the four conditions, the attack rate was highest when a three-person group faced an individual. As possible reasons for our observation, we discuss the potential threat stemming from the imbalance in the effectiveness of attack between individuals and groups, and the (incorrect) belief by groups that single individuals would be more likely to attack out of fear. PMID:27148871
NASA Astrophysics Data System (ADS)
Wang, C. N.; Lin, H. S.; Hsu, H. P.; Wang, Yen-Hui; Chang, Y. P.
2016-04-01
The integrated circuit (IC) manufacturing industry is one of the biggest output industries in this century. The 300mm wafer fabs is the major fab size of this industry. The automatic material handling system (AMHS) has become one of the most concerned issues among semiconductor manufacturers. The major lot delivery of 300mm fabs is used overhead hoist transport (OHT). The traffic jams are happened frequently due to the wide variety of products and big amount of OHTs moving in the fabs. The purpose of this study is to enhance the delivery performance of automatic material handling and reduce the delay and waiting time of product transportation for both hot lots and normal lots. Therefore, this study proposes an effective OHT dispatching rule: preemptive stocker dispatching (PSD). Simulation experiments are conducted and one of the best differentiated preemptive rule, differentiated preemptive dispatching (DPD), is used for comparison. Compared with DPD, The results indicated that PSD rule can reduce average variable delivery time of normal lots by 13.15%, decreasing average variable delivery time of hot lots by 17.67%. Thus, the PSD rule can effectively reduce the delivery time and enhance productivity in 300 mm wafer fabs.
NASA Astrophysics Data System (ADS)
Wang, Liping; Ji, Yusheng; Liu, Fuqiang
The integration of multihop relays with orthogonal frequency-division multiple access (OFDMA) cellular infrastructures can meet the growing demands for better coverage and higher throughput. Resource allocation in the OFDMA two-hop relay system is more complex than that in the conventional single-hop OFDMA system. With time division between transmissions from the base station (BS) and those from relay stations (RSs), fixed partitioning of the BS subframe and RS subframes can not adapt to various traffic demands. Moreover, single-hop scheduling algorithms can not be used directly in the two-hop system. Therefore, we propose a semi-distributed algorithm called ASP to adjust the length of every subframe adaptively, and suggest two ways to extend single-hop scheduling algorithms into multihop scenarios: link-based and end-to-end approaches. Simulation results indicate that the ASP algorithm increases system utilization and fairness. The max carrier-to-interference ratio (Max C/I) and proportional fairness (PF) scheduling algorithms extended using the end-to-end approach obtain higher throughput than those using the link-based approach, but at the expense of more overhead for information exchange between the BS and RSs. The resource allocation scheme using ASP and end-to-end PF scheduling achieves a tradeoff between system throughput maximization and fairness.
Techniques for establishing schedules with wheel running as reinforcement in rats.
Iversen, I H
1993-07-01
In three experiments, access to wheel running was contingent on lever pressing. In each experiment, the duration of access to running was reduced gradually to 4, 5, or 6 s, and the schedule parameters were expanded gradually. The sessions lasted 2 hr. In Experiment 1, a fixed-ratio 20 schedule controlled a typical break-and-run pattern of lever pressing that was maintained throughout the session for 3 rats. In Experiment 2, a fixed-interval schedule of 6 min maintained lever pressing throughout the session for 3 rats, and for 1 rat, the rate of lever pressing was positively accelerated between reinforcements. In Experiment 3, a variable-ratio schedule of 20 or 35 was in effect and maintained lever pressing at a very stable pace throughout the session for 2 of 3 rats; for 1 rat, lever pressing was maintained at an irregular rate. When the session duration was extended to successive 24-hr periods, with food and water accessible in Experiment 3, lever pressing settled into a periodic pattern occurring at a high rate at approximately the same time each day. In each experiment, the rats that developed the highest local rates of running during wheel access also maintained the most stable and highest rates of lever pressing.
Managing Contention and Timing Constraints in a Real-Time Database System
1995-01-01
In order to realize many of these goals, StarBase is constructed on top of RT-Mach, a real - time operating system developed at Carnegie Mellon...University [ll]. StarBase differs from previous RT-DBMS work [l, 2, 31 in that a) it relies on a real - time operating system which provides priority...CPU and resource scheduling pro- vided by tlhe underlying real - time operating system . Issues of data contention are dealt with by use of a priority
22 CFR 171.41 - Covered employees.
Code of Federal Regulations, 2010 CFR
2010-04-01
... GS-16 and above of the General Schedule, or the rate of basic pay for which is fixed, other than under the General Schedule, at a rate equal to or greater than the 120% of the minimum rate of basic pay... Director of the Office of Government Ethics to be of equal classification to GS-16; (c) Employees in the...
Code of Federal Regulations, 2013 CFR
2013-10-01
...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of... Satellite Transmit/Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159...) 312 Main & 159 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less...
Code of Federal Regulations, 2012 CFR
2012-10-01
...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of... Satellite Transmit/Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159...) 312 Main & 159 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less...
Short-term scheduling of an open-pit mine with multiple objectives
NASA Astrophysics Data System (ADS)
Blom, Michelle; Pearce, Adrian R.; Stuckey, Peter J.
2017-05-01
This article presents a novel algorithm for the generation of multiple short-term production schedules for an open-pit mine, in which several objectives, of varying priority, characterize the quality of each solution. A short-term schedule selects regions of a mine site, known as 'blocks', to be extracted in each week of a planning horizon (typically spanning 13 weeks). Existing tools for constructing these schedules use greedy heuristics, with little optimization. To construct a single schedule in which infrastructure is sufficiently utilized, with production grades consistently close to a desired target, a planner must often run these heuristics many times, adjusting parameters after each iteration. A planner's intuition and experience can evaluate the relative quality and mineability of different schedules in a way that is difficult to automate. Of interest to a short-term planner is the generation of multiple schedules, extracting available ore and waste in varying sequences, which can then be manually compared. This article presents a tool in which multiple, diverse, short-term schedules are constructed, meeting a range of common objectives without the need for iterative parameter adjustment.
Evaluation of concurrent priority queue algorithms. Technical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huang, Q.
1991-02-01
The priority queue is a fundamental data structure that is used in a large variety of parallel algorithms, such as multiprocessor scheduling and parallel best-first search of state-space graphs. This thesis addresses the design and experimental evaluation of two novel concurrent priority queues: a parallel Fibonacci heap and a concurrent priority pool, and compares them with the concurrent binary heap. The parallel Fibonacci heap is based on the sequential Fibonacci heap, which is theoretically the most efficient data structure for sequential priority queues. This scheme not only preserves the efficient operation time bounds of its sequential counterpart, but also hasmore » very low contention by distributing locks over the entire data structure. The experimental results show its linearly scalable throughput and speedup up to as many processors as tested (currently 18). A concurrent access scheme for a doubly linked list is described as part of the implementation of the parallel Fibonacci heap. The concurrent priority pool is based on the concurrent B-tree and the concurrent pool. The concurrent priority pool has the highest throughput among the priority queues studied. Like the parallel Fibonacci heap, the concurrent priority pool scales linearly up to as many processors as tested. The priority queues are evaluated in terms of throughput and speedup. Some applications of concurrent priority queues such as the vertex cover problem and the single source shortest path problem are tested.« less
Campos, Claudia; Leon, Yanerys; Sleiman, Andressa; Urcuyo, Beatriz
2017-03-01
One potential limitation of functional communication training (FCT) is that after the functional communication response (FCR) is taught, the response may be emitted at high rates or inappropriate times. Thus, schedule thinning is often necessary. Previous research has demonstrated that multiple schedules can facilitate schedule thinning by establishing discriminative control of the communication response while maintaining low rates of problem behavior. To date, most applied research evaluating the clinical utility of multiple schedules has done so in the context of behavior maintained by positive reinforcement (e.g., attention or tangible items). This study examined the use of a multiple schedule with alternating Fixed Ratio (FR 1)/extinction (EXT) components for two individuals with developmental disabilities who emitted escape-maintained problem behavior. Although problem behavior remained low during all FCT and multiple schedule phases, the use of the multiple schedule alone did not result in discriminated manding.
78 FR 79027 - Product Change-Priority Mail Express Negotiated Service Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
...The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a domestic shipping services contract to the list of Negotiated Service Agreements in the Mail Classification Schedule's Competitive Products List.
78 FR 79027 - Product Change-Priority Mail Negotiated Service Agreement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
...The Postal Service gives notice of filing a request with the Postal Regulatory Commission to add a domestic shipping services contract to the list of Negotiated Service Agreements in the Mail Classification Schedule's Competitive Products List.
Choice with frequently changing food rates and food ratios.
Baum, William M; Davison, Michael
2014-03-01
In studies of operant choice, when one schedule of a concurrent pair is varied while the other is held constant, the constancy of the constant schedule may exert discriminative control over performance. In our earlier experiments, schedules varied reciprocally across components within sessions, so that while food ratio varied food rate remained constant. In the present experiment, we held one variable-interval (VI) schedule constant while varying the concurrent VI schedule within sessions. We studied five conditions, each with a different constant left VI schedule. On the right key, seven different VI schedules were presented in seven different unsignaled components. We analyzed performances at several different time scales. At the longest time scale, across conditions, behavior ratios varied with food ratios as would be expected from the generalized matching law. At shorter time scales, effects due to holding the left VI constant became more and more apparent, the shorter the time scale. In choice relations across components, preference for the left key leveled off as the right key became leaner. Interfood choice approximated strict matching for the varied right key, whereas interfood choice hardly varied at all for the constant left key. At the shortest time scale, visit patterns differed for the left and right keys. Much evidence indicated the development of a fix-and-sample pattern. In sum, the procedural difference made a large difference to performance, except for choice at the longest time scale and the fix-and-sample pattern at the shortest time scale. © Society for the Experimental Analysis of Behavior.
Analysis and design of gain scheduled control systems. Ph.D. Thesis
NASA Technical Reports Server (NTRS)
Shamma, Jeff S.
1988-01-01
Gain scheduling, as an idea, is to construct a global feedback control system for a time varying and/or nonlinear plant from a collection of local time invariant designs. However in the absence of a sound analysis, these designs come with no guarantees on the robustness, performance, or even nominal stability of the overall gain schedule design. Such an analysis is presented for three types of gain scheduling situations: (1) a linear parameter varying plant scheduling on its exogenous parameters, (2) a nonlinear plant scheduling on a prescribed reference trajectory, and (3) a nonlinear plant scheduling on the current plant output. Conditions are given which guarantee that the stability, robustness, and performance properties of the fixed operating point designs carry over to the global gain scheduled designs, such as the scheduling variable should vary slowly and capture the plants nonlinearities. Finally, an alternate design framework is proposed which removes the slowing varying restriction or gain scheduled systems. This framework addresses some fundamental feedback issues previously ignored in standard gain.
J.R. Withrow; E.L. Smith; F.H. Koch; D. Yemshanov
2015-01-01
In pest risk assessment it is frequently necessary to make time-critical decisions regarding management of expanding pest populations. When an invasive pest outbreak is expanding rapidly, preemptive quarantine of areas that are under imminent threat of infestation is one of only a few available management tools that can be implemented quickly to help control the...
Pre-emptive therapy for severe nausea and vomiting of pregnancy and hyperemesis gravidarum.
Koren, G; Maltepe, Caroline
2004-08-01
Nausea and vomiting of pregnancy (NVP) affects 80% of pregnancies. Its severe form, hyperemesis gravidarum (HG), results in dehydration, electrolyte imbalance, the need for hospitalisation and can, rarely, be fatal. This was a prospective, open-labelled, controlled, interventional study to evaluate the effectiveness of pre-emptive treatment of NVP symptoms in women who experienced severe NVP or HG in their previous pregnancy. Twenty-five women who reported severe symptoms of NVP with or without HG in their previous pregnancy were recruited and counselled to commence the use of antiemetics as soon as they became aware of the present pregnancy, and no later than the beginning of symptoms. They were followed-up prospectively through the index pregnancy for symptoms of NVP, and were counselled continuously as to how to modify antiemetic doses based on symptoms. A comparison group consisted of randomly selected women also counselled by us for NVP, who had also had severe NVP in the previous pregnancy, but who did not call before a planned pregnancy and thus could not be offered pre-emptive therapy. The recruited women commenced pre-emptive drug therapy for NVP before conception or up to 7 weeks' gestation, before the appearance of NVP symptoms in all cases. In comparison to the previous pregnancy, only eight of these 18 women experienced a HG again in the index pregnancy (P = 0.01). The majority of study the women had an improvement in severity of NVP symptoms compared to the previous pregnancy. In the comparison group (n = 35), symptoms in the index pregnancy remained severe in 28 cases (80%), decreased to moderate in six (16.6%) and decreased to mild in five cases (13.9%). There were five cases of HG in the previous pregnancy and three in the index pregnancy. The pre-emptive group was improved significantly compared to the control group (P = 0.01). Pre-emptive symptom management appears to be effective in preventing severe NVP in general, and HG in particular. Women who have experienced severe NVP in a previous pregnancy may benefit from taking antiemetics before, or immediately at the start of symptoms in a subsequent pregnancy.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... Assignments or transfers (all services) Corres & 159 1,015.00 CUT 3. Fixed Satellite Transmit/Receive Earth... 175.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6... Only Earth Stations: a. Initial Applications for Registration or License (per station) 312 Main...
Sleep and performance in simulated Navy watch schedules.
Skornyakov, Elena; Shattuck, Nita L; Winser, Michael A; Matsangas, Panagiotis; Sparrow, Amy R; Layton, Matthew E; Gabehart, Rylie J; Van Dongen, Hans P A
2017-02-01
To operate Navy ships 24h per day, watchstanding is needed around the clock, with watch periods reflecting a variety of rotating or fixed shift schedules. The 5/15 watch schedule cycles through watch periods with 5h on, 15h off watch, such that watches occur 4h earlier on the clock each day - that is, the watches rotate backward. The timing of sleep varies over 4-day cycles, and sleep is split on some days to accommodate nighttime watchstanding. The 3/9 watch schedule cycles through watch periods with 3h on, 9h off watch, allowing for consistent sleep timing over days. In some sections of the 3/9 watch schedule, sleep may need to be split to accommodate nighttime watchstanding. In both the 5/15 and 3/9 watch schedules, four watch sections alternate to cover the 24h of the day. Here we compared sleep duration, psychomotor vigilance and subjective sleepiness in simulated sections of the 5/15 and 3/9 watch schedules. Fifteen healthy male subjects spent 6 consecutive days (5 nights) in the laboratory. Sleep opportunities were restricted to an average of 6.5h daily. Actigraphically estimated sleep duration was 5.6h per watch day on average, with no significant difference between watch sections. Sleep duration was not reduced when sleep opportunities were split. Psychomotor vigilance degraded over watch days, and tended to be more variable in the 5/15 than in the 3/9 watch sections. These laboratory-based findings suggest that Navy watch schedules are associated with cumulative sleep loss and a build-up of fatigue across days. The fixed watch periods of the 3/9 watch schedule appear to yield more stable performance than the backward rotating watch periods of the 5/15 watch schedule. Optimal performance may require longer and more consistent daily opportunities for sleep than are typically obtained in Navy operations. Copyright © 2015 Elsevier Ltd. All rights reserved.
NASA Astrophysics Data System (ADS)
Freund, Richard F.; Braun, Tracy D.; Kussow, Matthew; Godfrey, Michael; Koyama, Terry
2001-07-01
SPANR (Schedule, Plan, Assess Networked Resources) is (i) a pre-run, off-line planning and (ii) a runtime, just-in-time scheduling mechanism. It is designed to support primarily commercial applications in that it optimizes throughput rather than individual jobs (unless they have highest priority). Thus it is a tool for a commercial production manager to maximize total work. First the SPANR Planner is presented showing the ability to do predictive 'what-if' planning. It can answer such questions as, (i) what is the overall effect of acquiring new hardware or (ii) what would be the effect of a different scheduler. The ability of the SPANR Planner to formulate in advance tree-trimming strategies is useful in several commercial applications, such as electronic design or pharmaceutical simulations. The SPANR Planner is demonstrated using a variety of benchmarks. The SPANR Runtime Scheduler (RS) is briefly presented. The SPANR RS can provide benefit for several commercial applications, such as airframe design and financial applications. Finally a design is shown whereby SPANR can provide scheduling advice to most resource management systems.
Pre-Emptive Tramadol Could Reduce Pain after Ureteroscopic Lithotripsy
Denčić, Nataša; Jovičić, Jelena; Mirković, Jelena; Durutović, Otaš; Milenković-Petronić, Dragica; Lađević, Nebojša
2014-01-01
Purpose Optimal analgesia in ambulatory urology patients still remains a challenge. The aim of this study was to examine if the pre-emptive use of intravenous tramadol can reduce pain after ureteroscopic lithotripsy in patients diagnosed with unilateral ureteral stones. Materials and Methods This prospective pilot cohort study included 74 patients diagnosed with unilateral ureteral stones who underwent ureteroscopic lithotripsy under general anesthesia in the Urology Clinic at the Clinical Center of Serbia from March to June 2012. All patients were randomly allocated to two groups: one group (38 patients) received intravenous infusion of tramadol 100 mg in 500 mL 0.9%NaCl one hour before the procedure, while the other group (36 patients) received 500 mL 0.9%NaCl at the same time. Visual analogue scale (VAS) scores were recorded once prior to surgery and two times after the surgery (1 h and 6 h, respectively). The patients were prescribed additional postoperative analgesia (diclofenac 75 mg i.m.) when required. Pre-emptive effects of tramadol were assessed measuring pain scores, VAS1 and VAS2, intraoperative fentanyl consumption, and postoperative analgesic requirement. Results The average VAS1 score in the tramadol group was significantly lower than that in the non-tramadol group. The difference in average VAS2 score values between the two groups was not statistically significant; however, there were more patients who experienced severe pain in the non-tramadol group (p<0.01). The number of patients that required postoperative analgesia was not statistically different between the groups. Conclusion Pre-emptive tramadol did reduce early postoperative pain. The patients who received pre-emptive tramadol were less likely to experience severe post-operative pain. PMID:25048508
Pre-emptive tramadol could reduce pain after ureteroscopic lithotripsy.
Mimić, Ana; Denčić, Nataša; Jovičić, Jelena; Mirković, Jelena; Durutović, Otaš; Milenković-Petronić, Dragica; Lađević, Nebojša
2014-09-01
Optimal analgesia in ambulatory urology patients still remains a challenge. The aim of this study was to examine if the pre-emptive use of intravenous tramadol can reduce pain after ureteroscopic lithotripsy in patients diagnosed with unilateral ureteral stones. This prospective pilot cohort study included 74 patients diagnosed with unilateral ureteral stones who underwent ureteroscopic lithotripsy under general anesthesia in the Urology Clinic at the Clinical Center of Serbia from March to June 2012. All patients were randomly allocated to two groups: one group (38 patients) received intravenous infusion of tramadol 100 mg in 500 mL 0.9%NaCl one hour before the procedure, while the other group (36 patients) received 500 mL 0.9%NaCl at the same time. Visual analogue scale (VAS) scores were recorded once prior to surgery and two times after the surgery (1 h and 6 h, respectively). The patients were prescribed additional postoperative analgesia (diclofenac 75 mg i.m.) when required. Pre-emptive effects of tramadol were assessed measuring pain scores, VAS1 and VAS2, intraoperative fentanyl consumption, and postoperative analgesic requirement. The average VAS1 score in the tramadol group was significantly lower than that in the non-tramadol group. The difference in average VAS2 score values between the two groups was not statistically significant; however, there were more patients who experienced severe pain in the non-tramadol group (p<0.01). The number of patients that required postoperative analgesia was not statistically different between the groups. Pre-emptive tramadol did reduce early postoperative pain. The patients who received pre-emptive tramadol were less likely to experience severe post-operative pain.
Pang, Y-K; Ip, M; You, J H S
2017-01-01
Early initiation of antifungal treatment for invasive candidiasis is associated with change in mortality. Beta-D-glucan (BDG) is a fungal cell wall component and a serum diagnostic biomarker of fungal infection. Clinical findings suggested an association between reduced invasive candidiasis incidence in intensive care units (ICUs) and BDG-guided preemptive antifungal therapy. We evaluated the potential cost-effectiveness of active BDG surveillance with preemptive antifungal therapy in patients admitted to adult ICUs from the perspective of Hong Kong healthcare providers. A Markov model was designed to simulate the outcomes of active BDG surveillance with preemptive therapy (surveillance group) and no surveillance (standard care group). Candidiasis-associated outcome measures included mortality rate, quality-adjusted life year (QALY) loss, and direct medical cost. Model inputs were derived from the literature. Sensitivity analyses were conducted to evaluate the robustness of model results. In base-case analysis, the surveillance group was more costly (1387 USD versus 664 USD) (1 USD = 7.8 HKD), with lower candidiasis-associated mortality rate (0.653 versus 1.426 per 100 ICU admissions) and QALY loss (0.116 versus 0.254) than the standard care group. The incremental cost per QALY saved by the surveillance group was 5239 USD/QALY. One-way sensitivity analyses found base-case results to be robust to variations of all model inputs. In probabilistic sensitivity analysis, the surveillance group was cost-effective in 50 % and 100 % of 10,000 Monte Carlo simulations at willingness-to-pay (WTP) thresholds of 7200 USD/QALY and ≥27,800 USD/QALY, respectively. Active BDG surveillance with preemptive therapy appears to be highly cost-effective to reduce the candidiasis-associated mortality rate and save QALYs in the ICU setting.
Vaez, Savil Costa; Faria-e-Silva, André Luís; Loguércio, Alessandro Dourado; Fernandes, Micaelle Tenório Guedes; Nahsan, Flávia Pardo Salata
2018-01-01
Abstract Purpose This study determined the effectiveness of the preemptive administration of etodolac on risk and intensity of tooth sensitivity and the bleaching effect caused by in-office bleaching using 35% hydrogen peroxide. Material and methods Fifty patients were selected for this tripleblind, randomized, crossover, and placebo-controlled clinical trial. Etodolac (400 mg) or placebo was administrated in a single-dose 1 hour prior to the bleaching procedure. The whitening treatment with 35% hydrogen peroxide was carried out in two sessions with a 7-day interval. Tooth sensitivity was assessed before, during, and 24 hours after the procedure using the analog visual scale and the verbal rating scale. Color alteration was assessed by a bleach guide scale, 7 days after each session. Relative risk of sensitivity was calculated and adjusted by session, while overall risk was compared by the McNemar's test. Data on the sensitivity level of both scales and color shade were subjected to Friedman, Wilcoxon, and Mann-Whitney tests, respectively (α=0.05). Results The preemptive administration of etodolac did not affect the risk of tooth sensitivity and the level of sensitivity reported, regardless of the time of evaluation and scale used. The sequence of treatment allocation did not affect bleaching effectiveness, while the second session resulted in additional color modification. The preemptive administration of etodolac in a single dose 1 hour prior to in-office tooth bleaching did not alter tooth color, and the risk and intensity of tooth sensitivity reported by patients. Conclusion A single-dose preemptive administration of 400 mg of etodolac did not affect either risk of tooth sensitivity or level of sensitivity reported by patients, during or after the in-office tooth bleaching procedure. PMID:29412363
Vaez, Savil Costa; Faria-E-Silva, André Luís; Loguércio, Alessandro Dourado; Fernandes, Micaelle Tenório Guedes; Nahsan, Flávia Pardo Salata
2018-02-01
This study determined the effectiveness of the preemptive administration of etodolac on risk and intensity of tooth sensitivity and the bleaching effect caused by in-office bleaching using 35% hydrogen peroxide. Fifty patients were selected for this tripleblind, randomized, crossover, and placebo-controlled clinical trial. Etodolac (400 mg) or placebo was administrated in a single-dose 1 hour prior to the bleaching procedure. The whitening treatment with 35% hydrogen peroxide was carried out in two sessions with a 7-day interval. Tooth sensitivity was assessed before, during, and 24 hours after the procedure using the analog visual scale and the verbal rating scale. Color alteration was assessed by a bleach guide scale, 7 days after each session. Relative risk of sensitivity was calculated and adjusted by session, while overall risk was compared by the McNemar's test. Data on the sensitivity level of both scales and color shade were subjected to Friedman, Wilcoxon, and Mann-Whitney tests, respectively (α=0.05). The preemptive administration of etodolac did not affect the risk of tooth sensitivity and the level of sensitivity reported, regardless of the time of evaluation and scale used. The sequence of treatment allocation did not affect bleaching effectiveness, while the second session resulted in additional color modification. The preemptive administration of etodolac in a single dose 1 hour prior to in-office tooth bleaching did not alter tooth color, and the risk and intensity of tooth sensitivity reported by patients. A single-dose preemptive administration of 400 mg of etodolac did not affect either risk of tooth sensitivity or level of sensitivity reported by patients, during or after the in-office tooth bleaching procedure.
Salavatian, Siamak; Beaumont, Eric; Longpré, Jean-Philippe; Armour, J. Andrew; Vinet, Alain; Jacquemet, Vincent; Shivkumar, Kalyanam
2016-01-01
Mediastinal nerve stimulation (MNS) reproducibly evokes atrial fibrillation (AF) by excessive and heterogeneous activation of intrinsic cardiac (IC) neurons. This study evaluated whether preemptive vagus nerve stimulation (VNS) impacts MNS-induced evoked changes in IC neural network activity to thereby alter susceptibility to AF. IC neuronal activity in the right atrial ganglionated plexus was directly recorded in anesthetized canines (n = 8) using a linear microelectrode array concomitant with right atrial electrical activity in response to: 1) epicardial touch or great vessel occlusion vs. 2) stellate or vagal stimulation. From these stressors, post hoc analysis (based on the Skellam distribution) defined IC neurons so recorded as afferent, efferent, or convergent (afferent and efferent inputs) local circuit neurons (LCN). The capacity of right-sided MNS to modify IC activity in the induction of AF was determined before and after preemptive right (RCV)- vs. left (LCV)-sided VNS (15 Hz, 500 μs; 1.2× bradycardia threshold). Neuronal (n = 89) activity at baseline (0.11 ± 0.29 Hz) increased during MNS-induced AF (0.51 ± 1.30 Hz; P < 0.001). Convergent LCNs were preferentially activated by MNS. Preemptive RCV reduced MNS-induced changes in LCN activity (by 70%) while mitigating MNS-induced AF (by 75%). Preemptive LCV reduced LCN activity by 60% while mitigating AF potential by 40%. IC neuronal synchrony increased during neurally induced AF, a local neural network response mitigated by preemptive VNS. These antiarrhythmic effects persisted post-VNS for, on average, 26 min. In conclusion, VNS preferentially targets convergent LCNs and their interactive coherence to mitigate the potential for neurally induced AF. The antiarrhythmic properties imposed by VNS exhibit memory. PMID:27591222
Avraham, Sarit; Gat, Itai; Duvdevani, Nir-Ram; Haas, Jigal; Frenkel, Yair; Seidman, Daniel S
2012-03-01
To determine the efficacy of pre-emptive administration of the nonsteroidal anti-inflammatory drug (NSAID) ibuprofen vs. a placebo on pain relief during medical abortion and to evaluate whether NSAIDs interfere with the action of misoprostol. Prospective, double-blind, randomized, controlled study. University-affiliated tertiary hospital. Sixty-one women who underwent first-trimester termination of pregnancy. Patients received 600 mg mifepristone orally, followed by 400 μg oral misoprostol 2 days later. They were randomized to receive pre-emptively two tablets of 400 mg ibuprofen orally or a placebo, when taking the misoprostol. The patients completed a questionnaire about side effects and pain score and returned for an ultrasound follow-up examination 10-14 days after the medical abortion. Significant pain, assessed by the need for additional analgesia, and failure rates, defined by a need for surgical intervention. Pre-emptive ibuprofen treatment was found to be more effective than a placebo in pain prevention, as determined by a significantly lower need for additional analgesia: 11 of 29 (38%) vs. 25 of 32 (78%), respectively. Treatment failure rate was not statistically different between the ibuprofen and placebo groups: 4 of 28 (14.2%) vs. 3 of 31 (9.7%), respectively. History of menstrual pain was predictive for the need of additional analgesia. Pre-emptive use of ibuprofen had a statistically significant beneficial effect on the need for pain relief during a mifepristone and misoprostol regimen for medical abortion. Ibuprofen did not adversely affect the outcome of medical abortion. NCT00997074. Copyright © 2012 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.
Lacasa, J M; Jiménez, J A; Ferrás, V; Bossom, M; Sóla-Morales, O; García-Rey, C; Aguilar, L; Garau, J
2007-04-01
The most common complications after surgical extraction of the third mandibular molar are trismus, oedema or swelling, local pain, dysphagia and infection. The aim of this comparative, double-blind, randomized clinical trial was to evaluate the efficacy of two sustained release amoxicillin/clavulanate regimens in the reduction of infection after third molar extractive surgery. A total of 225 patients were randomized into three equal groups: placebo, prophylaxis with single pre-surgical dose of two tablets amoxicillin/clavulanate 1000/62.5 mg, and pre-emptive post-surgery therapy with two tablets amoxicillin/clavulanate 1000/62.5 mg BID for 5 days. A higher rate of infection (P=0.006) was found among patients receiving placebo (16%) than those receiving single-dose prophylaxis (5.3%) or 5-day pre-emptive therapy (2.7%). A relationship between both the duration (13.8% for long versus 7.4% for medium versus 1.6% for short) and difficulty (12.7% with ostectomy versus 3.5% without ostectomy; P=0.011) of surgical procedure and incidence of subsequent infection was also observed. Both prophylactic and therapeutic regimens versus placebo achieved greater reduction of pain after surgery on day 3 (P=0.001). Logistic regression analysis revealed a risk of infection of 24%, 9% and 4% for ostectomy with placebo, prophylaxis and pre-emptive treatment, respectively, whereas it was 7%, 2% and 1% if ostectomy was not performed. Pre-emptive therapy with the oral sustained release amoxicillin/clavulanate formulation reduced the rate of subsequent infection in patients undergoing ostectomy. Prophylaxis was beneficial in simpler procedures and may be indicated in cases where ostectomy is not performed.
Siribumrungwong, Koopong; Cheewakidakarn, Julin; Tangtrakulwanich, Boonsin; Nimmaanrat, Sasikaan
2015-03-18
Poor postoperative pain control is frequently associated with complications and delayed discharge from a hospital. Preemptive analgesia is one of the methods suggested for reducing postoperative pain. Opioids are effective for pain control, but there known addictive properties make physicians cautious about using them. Parecoxib and ketorolac are potent non-opioid NSAIDs that are attractive alternative drugs to opioids to avoid opioid-related side effects. However, there are no good head-to-head comparisons between these two drugs in the aspect of preemptive analgesic effects in lumbar spinal fusion surgery. This study aimed to compare the efficacy in terms of postoperative pain control and safety of parecoxib with ketorolac as preemptive analgesia in posterior lumbar spinal fusion patients. A prospective, double-blinded randomized controlled trial was carried out in patients undergoing posterior lumbar spinal fusion, who were randomized into 3 groups (n = 32). Parecoxib, ketorolac or a placebo was given to each patient via injection around 30 minutes prior to incision. The efficacy of postoperative pain control was assessed by a verbal numerical rating score (0-10). And various postoperative things were monitored for analysis, such as total opioid consumption, complications, and estimated blood loss. Both the ketorolac and parecoxib groups showed significantly better early postoperative pain reduction at the postanesthesia care unit (PACU) than the control group (p < 0.05). There were no differences between the pain scores of ketorolac and parecoxib at any time points. Complications and bleeding were not significantly different between all three groups. Preemptive analgesia using both ketorolac and parecoxib showed a significantly better early postoperative pain control in the PACU than the control group in patients undergoing lumbar spinal fusion. ClinicalTrials.gov NCT01859585. Registered 15 May 2013.
47 CFR 74.604 - Interference avoidance.
Code of Federal Regulations, 2010 CFR
2010-10-01
... common channel for TV pickup, TV STL, or TV relay purposes in the same area and simultaneous operation is... will have the following priority for purposes of interference protection: (1) All fixed links for full...
47 CFR 74.604 - Interference avoidance.
Code of Federal Regulations, 2011 CFR
2011-10-01
... common channel for TV pickup, TV STL, or TV relay purposes in the same area and simultaneous operation is... will have the following priority for purposes of interference protection: (1) All fixed links for full...
ERIC Educational Resources Information Center
McGinnis, Molly A.; Houchins-Juarez, Nealetta; McDaniel, Jill L.; Kennedy, Craig H.
2010-01-01
Three participants whose problem behavior was maintained by contingent attention were exposed to 45-min presessions in which attention was withheld, provided on a fixed-time (FT) 15-s schedule, or provided on an FT 120-s schedule. Following each presession, participants were then tested in a 15-min session similar to the social attention condition…
49 CFR Appendix D to Part 37 - Construction and Interpretation of Provisions of 49 CFR Part 37
Code of Federal Regulations, 2010 CFR
2010-10-01
... service is fixed route, from the train station to a few points in the metropolitan area, with a schedule keyed to the train schedule. It would be regarded as commuter bus service, meaning that accessible... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Pt. 37, App. D Appendix D to Part 37—Construction...
Further Evaluation of Response-Independent Delivery of Preferred Stimuli and Child Compliance
ERIC Educational Resources Information Center
Normand, Matthew P.; Beaulieu, Lauren
2011-01-01
The effect of a fixed-time (FT) schedule involving the delivery of preferred stimuli prior to the issuance of a low-probability instruction was evaluated with 2 young children with autism. The FT schedule was introduced according to a reversal design with 3 target instructions, 1 for the first child and 2 for the second child. Compliance increased…
Code of Federal Regulations, 2011 CFR
2011-10-01
...) (per system) 312 & 159 180.00 CGV 7. Mobile Satellite Earth Stations: a. Initial Applications of.../Receive Earth Stations: a. Initial Application (per station) 312 Main & Schedule B & 159 2,615.00 BAX b... 180.00 CGX 4. Fixed Satellite transmit/receive Earth Stations (2 meters or less operating in the 4/6...
Evaluation of fixed momentary dro schedules under signaled and unsignaled arrangements.
Hammond, Jennifer L; Iwata, Brian A; Fritz, Jennifer N; Dempsey, Carrie M
2011-01-01
Fixed momentary schedules of differential reinforcement of other behavior (FM DRO) generally have been ineffective as treatment for problem behavior. Because most early research on FM DRO included presentation of a signal at the end of the DRO interval, it is unclear whether the limited effects of FM DRO were due to (a) the momentary response requirement of the schedule per se or (b) discrimination of the contingency made more salient by the signal. To separate these two potential influences, we compared the effects of signaled versus unsignaled FM DRO with 4 individuals with developmental disabilities whose problem behavior was maintained by social-positive reinforcement. During signaled FM DRO, the experimenter presented a visual stimulus 3 s prior to the end of the DRO interval and delivered reinforcement contingent on the absence of problem behavior at the second the interval elapsed. Unsignaled DRO was identical except that interval termination was not signaled. Results indicated that signaled FM DRO was effective in decreasing 2 subjects' problem behavior, whereas an unsignaled schedule was required for the remaining 2 subjects. These results suggest that the response requirement per se of FM DRO may not be problematic if it is not easily discriminated.
Student Services for a New Breed
ERIC Educational Resources Information Center
Simmons, Howard L.; Kochey, Kenneth C.
1975-01-01
Today's student needs services sensitive to his priorities of work and economic security. Suggested services include: transportation services, food services, financial aid for basic physical needs, flexible scheduling, facilities for "lifetime" sports activities, counselors located at community centers, cooperative arrangements with local cultural…
Problem area descriptions : motor vehicle crashes - data analysis and IVI program analysis
DOT National Transportation Integrated Search
In general, the IVI program focuses on the more significant safety problem categories as : indicated by statistical analyses of crash data. However, other factors were considered in setting : program priorities and schedules. For some problem areas, ...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
48 CFR 42.302 - Contract administration functions.
Code of Federal Regulations, 2011 CFR
2011-10-01
...) Perform preaward surveys (see Subpart 9.1). (33) Advise and assist contractors regarding their priorities... with contractual terms for schedule, cost, and technical performance in the areas of design... efforts and management systems that relate to design, development, production, engineering changes...
Wagman, Jason D; Lukas, Kristen E; Dennis, Patricia M; Willis, Mark A; Carroscia, Joe; Gindlesperger, Curt; Schook, Mandi W
2018-01-01
Zoo-housed bears are prone to exhibiting stereotypic behaviors, generally considered indicators of negative welfare. We explored the effects of a variable-time feeding enrichment schedule on behavioral indicators of welfare in four bear species at Cleveland Metroparks Zoo. We distributed the diets of eight bears in one of five enrichment items, for two consecutive days each, and monitored behavior throughout the day. In Experiment 1, we compared variable-time to fixed-time presentation of enrichment over two, 10-day periods. Overall, bears performed more exploratory behavior when enriched (p < 0.0001). Furthermore, variable-time enrichment was associated with a greater increase in exploratory behavior than fixed-time enrichment when compared to baseline (p < 0.001). Both fixed-time (p unadjusted <0.05, p adjusted = 0.07) and variable-schedule (p unadjusted <0.05, p adjusted = 0.09) enrichment were also associated with similar decreases in abnormal behavior compared to baseline. For Experiment 2, we tested habituation to enrichment over 30 days using multiple items and a semi-variable presentation schedule. Again during the enrichment period, bears exhibited increased exploratory behavior (p < 0.0001) and decreased abnormal behaviors compared to baseline (p unadjusted = 0.05, p adjusted = 0.09). We observed no habituation during the 30-day sustained enrichment period for these behaviors. Collectively, these results suggest that daily, variable-schedule feeding enrichment, with intermittent presentation of unique enrichment items, increases behavioral indicators of positive welfare and decreases behavioral indicators of negative welfare. © 2018 Wiley Periodicals, Inc.
Gonzalez, Fernando A.; Waller, Marcus B.
1974-01-01
An apparatus was designed to monitor handwriting behavior. Two subjects were studied under various schedules of monetary reinforcement for handwriting. The different schedules engendered and maintained distinctive response patterns but the rates of sustained responding did not vary across schedules. The development of fixed-interval performance following continuous reinforcement resembled the same transition in lower animals. In one subject, availability of reading material interacted with the schedule to determine response pattern. It was suggested that handwriting may be a more appropriate response for the experimental analysis of human behavior than the more frequently used button-pushing or lever-pulling responses. ImagesFig. 1.Fig. 2. PMID:16811729
Schedule-induced drinking as functions of interpellet interval and draught size in the Java macaque1
Allen, Joseph D.; Kenshalo, Dan R.
1978-01-01
Three Java monkeys received food pellets that were assigned by both ascending and descending series of fixed-time schedules whose values varied between 8 and 256 seconds. The draught size dispensed by a concurrently available water-delivery tube was systematically varied between 1.0 and 0.3 milliliter per lick at various fixed-time values during the second and third series determinations. Session water intake was bitonically related to the interpellet interval and was determined by the interaction of (1) the probability of initiating a drinking bout, which fell off at the highest interpellet intervals and, (2) the size of the bout, which increased directly with increases in interpellet interval. Variations in draught size had little effect on total session intakes, but reduced bout size at draught sizes of 0.5 milliliter and below. Thus, a volume-regulation process of schedule-induced drinking operated generally at the session-intake level, but was limited to higher draught sizes at the bout level. PMID:16812093
Schedule-induced drinking as functions of interpellet interval and draught size in the Java macaque.
Allen, J D; Kenshalo, D R
1978-09-01
Three Java monkeys received food pellets that were assigned by both ascending and descending series of fixed-time schedules whose values varied between 8 and 256 seconds. The draught size dispensed by a concurrently available water-delivery tube was systematically varied between 1.0 and 0.3 milliliter per lick at various fixed-time values during the second and third series determinations. Session water intake was bitonically related to the interpellet interval and was determined by the interaction of (1) the probability of initiating a drinking bout, which fell off at the highest interpellet intervals and, (2) the size of the bout, which increased directly with increases in interpellet interval. Variations in draught size had little effect on total session intakes, but reduced bout size at draught sizes of 0.5 milliliter and below. Thus, a volume-regulation process of schedule-induced drinking operated generally at the session-intake level, but was limited to higher draught sizes at the bout level.
A Mixed Integer Linear Program for Airport Departure Scheduling
NASA Technical Reports Server (NTRS)
Gupta, Gautam; Jung, Yoon Chul
2009-01-01
Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced delays as compared to FCFS, and the magnitude of the savings depends on the queue and departure fix structure. The MILP assumes deterministic aircraft arrival times at the runway queues. However, due to taxi time uncertainty, aircraft might arrive either earlier or later than these deterministic times. Thus, to incorporate this uncertainty, we present a method for using the MILP with "overlap discounted rolling planning horizon". The approach is based on valuing near-term decision results more than future ones. We develop a model of taxitime uncertainty based on real-world data, and then compare the baseline FCFS delays with delays using the above MILP in a simple rolling-horizon method and in the overlap discounted scheme.
2016-12-01
Vinci, M., Zordan, M., & Serra, G. (2006). Cost - benefit analysis of influenza vaccination in a public healthcare unit. Therapeutics and Clinical...readiness, flu morbidity, flu vaccination, pre-emptive vaccination plan, cost - benefit analysis 15. NUMBER OF PAGES 83 16. PRICE CODE 17...expenditures pose a heavy burden on the government. A cost - benefit analysis of the flu vaccination would assess whether conducting flu vaccination is
Abramowicz, Daniel; Hazzan, Marc; Maggiore, Umberto; Peruzzi, Licia; Cochat, Pierre; Oberbauer, Rainer; Haller, Maria C; Van Biesen, Wim
2016-05-01
This position statement brings up guidance on pre-emptive kidney transplantation from living donors. The provided guidance is based on a systematic review of the literature. © The Author 2015. Published by Oxford University Press on behalf of ERA-EDTA. All rights reserved.
Proactive Fault Tolerance Using Preemptive Migration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Engelmann, Christian; Vallee, Geoffroy R; Naughton, III, Thomas J
2009-01-01
Proactive fault tolerance (FT) in high-performance computing is a concept that prevents compute node failures from impacting running parallel applications by preemptively migrating application parts away from nodes that are about to fail. This paper provides a foundation for proactive FT by defining its architecture and classifying implementation options. This paper further relates prior work to the presented architecture and classification, and discusses the challenges ahead for needed supporting technologies.
Samwald, Matthias; Xu, Hong; Blagec, Kathrin; Empey, Philip E; Malone, Daniel C; Ahmed, Seid Mussa; Ryan, Patrick; Hofer, Sebastian; Boyce, Richard D
2016-01-01
Pre-emptive pharmacogenomic (PGx) testing of a panel of genes may be easier to implement and more cost-effective than reactive pharmacogenomic testing if a sufficient number of medications are covered by a single test and future medication exposure can be anticipated. We analysed the incidence of exposure of individual patients in the United States to multiple drugs for which pharmacogenomic guidelines are available (PGx drugs) within a selected four-year period (2009-2012) in order to identify and quantify the incidence of pharmacotherapy in a nation-wide patient population that could be impacted by pre-emptive PGx testing based on currently available clinical guidelines. In total, 73 024 095 patient records from private insurance, Medicare Supplemental and Medicaid were included. Patients enrolled in Medicare Supplemental age > = 65 or Medicaid age 40-64 had the highest incidence of PGx drug use, with approximately half of the patients receiving at least one PGx drug during the 4 year period and one fourth to one third of patients receiving two or more PGx drugs. These data suggest that exposure to multiple PGx drugs is common and that it may be beneficial to implement wide-scale pre-emptive genomic testing. Future work should therefore concentrate on investigating the cost-effectiveness of multiplexed pre-emptive testing strategies.
Preemptive Pharmacogenomic Testing for Precision Medicine
Ji, Yuan; Skierka, Jennifer M.; Blommel, Joseph H.; Moore, Brenda E.; VanCuyk, Douglas L.; Bruflat, Jamie K.; Peterson, Lisa M.; Veldhuizen, Tamra L.; Fadra, Numrah; Peterson, Sandra E.; Lagerstedt, Susan A.; Train, Laura J.; Baudhuin, Linnea M.; Klee, Eric W.; Ferber, Matthew J.; Bielinski, Suzette J.; Caraballo, Pedro J.; Weinshilboum, Richard M.; Black, John L.
2017-01-01
Significant barriers, such as lack of professional guidelines, specialized training for interpretation of pharmacogenomics (PGx) data, and insufficient evidence to support clinical utility, prevent preemptive PGx testing from being widely clinically implemented. The current study, as a pilot project for the Right Drug, Right Dose, Right Time–Using Genomic Data to Individualize Treatment Protocol, was designed to evaluate the impact of preemptive PGx and to optimize the workflow in the clinic setting. We used an 84-gene next-generation sequencing panel that included SLCO1B1, CYP2C19, CYP2C9, and VKORC1 together with a custom-designed CYP2D6 testing cascade to genotype the 1013 subjects in laboratories approved by the Clinical Laboratory Improvement Act. Actionable PGx variants were placed in patient's electronic medical records where integrated clinical decision support rules alert providers when a relevant medication is ordered. The fraction of this cohort carrying actionable PGx variant(s) in individual genes ranged from 30% (SLCO1B1) to 79% (CYP2D6). When considering all five genes together, 99% of the subjects carried an actionable PGx variant(s) in at least one gene. Our study provides evidence in favor of preemptive PGx testing by identifying the risk of a variant being present in the population we studied. PMID:26947514
Schildcrout, Jonathan S; Shi, Yaping; Danciu, Ioana; Bowton, Erica; Field, Julie R; Pulley, Jill M; Basford, Melissa A; Gregg, William; Cowan, James D; Harrell, Frank E; Roden, Dan M; Peterson, Josh F; Denny, Joshua C
2016-04-01
We describe the development, implementation, and evaluation of a model to pre-emptively select patients for genotyping based on medication exposure risk. Using deidentified electronic health records, we derived a prognostic model for the prescription of statins, warfarin, or clopidogrel. The model was implemented into a clinical decision support (CDS) tool to recommend pre-emptive genotyping for patients exceeding a prescription risk threshold. We evaluated the rule on an independent validation cohort and on an implementation cohort, representing the population in which the CDS tool was deployed. The model exhibited moderate discrimination with area under the receiver operator characteristic curves ranging from 0.68 to 0.75 at 1 and 2 years after index dates. Risk estimates tended to underestimate true risk. The cumulative incidences of medication prescriptions at 1 and 2 years were 0.35 and 0.48, respectively, among 1,673 patients flagged by the model. The cumulative incidences in the same number of randomly sampled subjects were 0.12 and 0.19, and in patients over 50 years with the highest body mass indices, they were 0.22 and 0.34. We demonstrate that prognostic algorithms can guide pre-emptive pharmacogenetic testing toward those likely to benefit from it. Copyright © 2016 Elsevier Inc. All rights reserved.
Fritz, Jennifer N; Jackson, Lynsey M; Stiefler, Nicole A; Wimberly, Barbara S; Richardson, Amy R
2017-07-01
The effects of noncontingent reinforcement (NCR) without extinction during treatment of problem behavior maintained by social positive reinforcement were evaluated for five individuals diagnosed with autism spectrum disorder. A continuous NCR schedule was gradually thinned to a fixed-time 5-min schedule. If problem behavior increased during NCR schedule thinning, a continuous NCR schedule was reinstated and NCR schedule thinning was repeated with differential reinforcement of alternative behavior (DRA) included. Results showed an immediate decrease in all participants' problem behavior during continuous NCR, and problem behavior maintained at low levels during NCR schedule thinning for three participants. Problem behavior increased and maintained at higher rates during NCR schedule thinning for two other participants; however, the addition of DRA to the intervention resulted in decreased problem behavior and increased mands. © 2017 Society for the Experimental Analysis of Behavior.
Individual differences in strategic flight management and scheduling
NASA Technical Reports Server (NTRS)
Wickens, Christopher D.; Raby, Mireille
1991-01-01
A group of 30 instrument-rated pilots was made to fly simulator approaches to three airports under conditions of low, medium, and high workload conditions. An analysis is presently conducted of the difference in discrete task scheduling between the group of 10 highest and 10 lowest performing pilots in the sample; this categorization was based on the mean of various flight-profile measures. The two groups were found to differ from each other only in terms of the time when specific events were conducted, and of the optimality of scheduling for certain high-priority tasks. These results are assessed in view of the relative independence of task-management skills from aircraft-control skills.
Symptom-Triggered vs. Fixed-Dosing Management of Alcohol Withdrawal Syndrome.
Skinner, Reagan T
2014-01-01
A literature review was conducted with the objective of creating evidence-based recommendations for use of symptom-triggered therapy (STT) or fixed-schedule dosing in treating alcohol withdrawal syndrome in inpatients. Use of STT reduced duration of therapy as well as the number of patients requiring treatment or medication, potentially reducing costs and risk of adverse medication reactions.
Schedule-induced masseter EMG in facial pain subjects vs. no-pain controls.
Gramling, S E; Grayson, R L; Sullivan, T N; Schwartz, S
1997-02-01
Empirical reports suggest that oral habits (e.g., teeth clenching) may be behavioral mediators linking stress to muscle hyperreactivity and the development of facial pain. Another report suggests that excessive behavioral adjuncts develop in conjunction with fixed-time stimulus presentation. The present study assessed the extent to which the oral habits exhibited by facial pain patients are schedule-induced. Subjects with Temporomandibular Disorder (TMD) symptomatology (n = 15) and pain-free controls (n = 15) participated in a 4-phase experiment (adaptation, baseline, task, recovery) designed to elicit schedule-induced behaviors. Self-report of oral habits and negative affect were recorded after each phase. Objective measures of oral habits were obtained via behavioral observation and masseter EMG recordings. Results revealed that negative arousal significantly increased during the fixed-time (FT) task and was also associated with increased oral habits among the TMD subjects. Moreover, 40% of the TMD subjects and none of the controls exhibited a pattern of EMG elevations in the early part of the inter-stimulus interval that met a strict criteria for scheduled-induced behavior per se. Taken together, these results suggest that the TMD subjects were engaging in schedule-induced oral habits. The adjunctive behavior literature seems to provide a plausible explanation as to how oral habits develop and are maintained in TMD patients, despite their painful consequences.
ERIC Educational Resources Information Center
Kennedy, Mike
2008-01-01
Schools and universities should have a thorough plan that sets priorities for the most pressing facility renovations. With remedial programs, enrichment offerings, recreational activities and extended-year schedules, many school facilities are no longer dormant in the summer months. The increased year-round use of education facilities benefits…
ARS irrigation research priorities and projects-An update
USDA-ARS?s Scientific Manuscript database
The USDA Agricultural Research Service focuses on six areas of research that are crucial to safe and effective use of all water resources for agricultural production: 1) Irrigation Scheduling Technologies for Water Productivity; 2) Water Productivity (WP) at Multiple Scales; 3) Irrigation Applicatio...
Resistance to Change and Preference for Variable versus Fixed Response Sequences
ERIC Educational Resources Information Center
Arantes, Joana; Berg, Mark E.; Le, Dien; Grace, Randolph C.
2012-01-01
In Experiment 1, 4 pigeons were trained on a multiple chain schedule in which the initial link was a variable-interval (VI) 20-s schedule signalled by a red or green center key, and terminal links required four responses made to the left (L) and/or right (R) keys. In the REPEAT component, signalled by red keylights, only LRLR terminal-link…
2016-03-01
to their pre-injury baseline activities after a week. One animal assigned to the irradiation group died at two weeks post op of unknown causes and was...kg) and enrofloxacin (5 mg/kg) were administered subcutaneously for preemptive analge- sia and prophylactic antibacterial coverage, respectively. The...Buprenorphine (0.05 mg/kg) and enrofloxacin (5 mg/kg) were administered subcutaneously for preemptive analgesia and prophylactic antibacterial coverage
Hallak, Ghias; Neuner, Bruno; Schefold, Joerg C; Gorzelniak, Kerstin; Rapsch, Brigitte; Pfüller, Roland; Stengel, Dirk; Wellmann, Jürgen; Ekkernkamp, Axel; Walter, Michael
2016-12-01
This sequential nonrandomized intervention study investigated the role of preemptive isolation precautions plus ultrarapid polymerase chain reaction screening for methicillin-resistant Staphylococcus aureus (MRSA). Compared with no prophylactic isolation plus conventional microbiology MRSA screening, nosocomial MRSA colonization and total MRSA incidence per 10,000 patient days significantly decreased. Infect Control Hosp Epidemiol 2016;1489-1491.
NASA Technical Reports Server (NTRS)
Cleaveland, Rance; Luettgen, Gerald; Natarajan, V.
1999-01-01
This paper surveys the semantic ramifications of extending traditional process algebras with notions of priority that allow for some transitions to be given precedence over others. These enriched formalisms allow one to model system features such as interrupts, prioritized choice, or real-time behavior. Approaches to priority in process algebras can be classified according to whether the induced notion of preemption on transitions is global or local and whether priorities are static or dynamic. Early work in the area concentrated on global pre-emption and static priorities and led to formalisms for modeling interrupts and aspects of real-time, such as maximal progress, in centralized computing environments. More recent research has investigated localized notions of pre-emption in which the distribution of systems is taken into account, as well as dynamic priority approaches, i.e., those where priority values may change as systems evolve. The latter allows one to model behavioral phenomena such as scheduling algorithms and also enables the efficient encoding of real-time semantics. Technically, this paper studies the different models of priorities by presenting extensions of Milner's Calculus of Communicating Systems (CCS) with static and dynamic priority as well as with notions of global and local pre- emption. In each case the operational semantics of CCS is modified appropriately, behavioral theories based on strong and weak bisimulation are given, and related approaches for different process-algebraic settings are discussed.
NASA Astrophysics Data System (ADS)
Olszewski, M.; Steele, R. S.
1983-02-01
Electric utility side meter storage options were assessed for the daily 2 h peaking spike application. The storage options considered included compressed air, batteries, and flywheels. The potential role for flywheels in this application was assessed and research and development (R and D) priorities were established for fixed base flywheel systems. Results of the worth cost analysis indicate that where geologic conditions are favorable, compressed air energy storage (CAES) is a strong competitor against combustion turbines. Existing battery and flywheel systems rated about equal, both being, at best, marginally uncompetitive with turbines. Advanced batteries, if existing cost and performance goals are met, could be competitive with CAES. A three task R and D effort for flywheel development appears warranted. The first task, directed at reducing fabrication coss and increasing performance of a chopped fiber, F-glass, solid disk concept, could produce a competitive flywheel system.
Five Strategies of Successful Part-Time Work.
ERIC Educational Resources Information Center
Corwin, Vivien; Lawrence, Thomas B.; Frost, Peter J.
2001-01-01
Identifies commonalities in the approaches of successful part-time professionals. Discusses five strategies for success: (1) communicating work-life priorities and schedules to the organization; (2) making the business case for part-time arrangements; (3) establishing time management routines; (4) cultivating advocates in senior management; and…
Future Research Priorities for Morbidity Control of Lymphedema.
Narahari, S R; Aggithaya, Madhur Guruprasad; Moffatt, Christine; Ryan, T J; Keeley, Vaughan; Vijaya, B; Rajendran, P; Karalam, S B; Rajagopala, S; Kumar, N K; Bose, K S; Sushma, K V
2017-01-01
Innovation in the treatment of lower extremity lymphedema has received low priority from the governments and pharmaceutical industry. Advancing lymphedema is irreversible and initiates fibrosis in the dermis, reactive changes in the epidermis and subcutis. Most medical treatments offered for lymphedema are either too demanding with a less than satisfactory response or patients have low concordance due to complex schedules. A priority setting partnership (PSP) was established to decide on the future priorities in lymphedema research. A table of abstracts following a literature search was published in workshop website. Stake holders were requested to upload their priorities. Their questions were listed, randomized, and sent to lymphologists for ranking. High ranked ten research priorities, obtained through median score, were presented in final prioritization work shop attended by invited stake holders. A free medical camp was organized during workshop to understand patients' priorities. One hundred research priorities were selected from priorities uploaded to website. Ten priorities were short listed through a peer review process involving 12 lymphologists, for final discussion. They were related to simplification of integrative treatment for lymphedema, cellular changes in lymphedema and mechanisms of its reversal, eliminating bacterial entry lesions to reduce cellulitis episodes, exploring evidence for therapies in traditional medicine, improving patient concordance to compression therapy, epidemiology of lymphatic filariasis (LF), and economic benefit of integrative treatments of lymphedema. A robust research priority setting process, organized as described in James Lind Alliance guidebook, identified seven priority areas to achieve effective morbidity control of lymphedema including LF. All stake holders including Department of Health Research, Government of India, participated in the PSP.
Future Research Priorities for Morbidity Control of Lymphedema
Narahari, S R; Aggithaya, Madhur Guruprasad; Moffatt, Christine; Ryan, T J; Keeley, Vaughan; Vijaya, B; Rajendran, P; Karalam, S B; Rajagopala, S; Kumar, N K; Bose, K S; Sushma, K V
2017-01-01
Background: Innovation in the treatment of lower extremity lymphedema has received low priority from the governments and pharmaceutical industry. Advancing lymphedema is irreversible and initiates fibrosis in the dermis, reactive changes in the epidermis and subcutis. Most medical treatments offered for lymphedema are either too demanding with a less than satisfactory response or patients have low concordance due to complex schedules. A priority setting partnership (PSP) was established to decide on the future priorities in lymphedema research. Methods: A table of abstracts following a literature search was published in workshop website. Stake holders were requested to upload their priorities. Their questions were listed, randomized, and sent to lymphologists for ranking. High ranked ten research priorities, obtained through median score, were presented in final prioritization work shop attended by invited stake holders. A free medical camp was organized during workshop to understand patients’ priorities. Results: One hundred research priorities were selected from priorities uploaded to website. Ten priorities were short listed through a peer review process involving 12 lymphologists, for final discussion. They were related to simplification of integrative treatment for lymphedema, cellular changes in lymphedema and mechanisms of its reversal, eliminating bacterial entry lesions to reduce cellulitis episodes, exploring evidence for therapies in traditional medicine, improving patient concordance to compression therapy, epidemiology of lymphatic filariasis (LF), and economic benefit of integrative treatments of lymphedema. Conclusion: A robust research priority setting process, organized as described in James Lind Alliance guidebook, identified seven priority areas to achieve effective morbidity control of lymphedema including LF. All stake holders including Department of Health Research, Government of India, participated in the PSP. PMID:28216723
Stabilization process of human population: a descriptive approach.
Kayani, A K; Krotki, K J
1981-01-01
An attempt is made to inquire into the process of stabilization of a human population. The same age distribution distorted by past variations in fertility is subjected to several fixed schedules of fertility. The schedules are different from each other monotonically over a narrow range. The primary concern is with the process, almost year by year, through which the populations become stable. There is particular interest in the differential impact in the same original age distribution of the narrowly different fixed fertility schedules. The exercise is prepared in 3 stages: general background of the process of stabilization; methodology and data used; and analysis and discussion of the stabilization process. Among the several approaches through which the analysis of stable population is possible, 2 are popular: the integral equation and the projection matrix. In this presentation the interest is in evaluating the effects of fertility on the stabilization process of a population. Therefore, only 1 initial age distribution and only 1 life table but a variety of narrowly different schedules of fertility have been used. Specifically, the U.S. 1963 female population is treated as the initial population. The process of stabilization is viewed in the light of the changes in the slopes between 2 successive age groups of an age distribution. A high fertility schedule with the given initial age distribution and mortality level overcomes the oscillations more quickly than the low fertility schedule. Simulation confirms the intuitively expected positive relationship between the mean of the slope and the level of fertility. The variance of the slope distribution is an indicator of the aging of the distribution.
Automatic Scheduling and Planning (ASAP) in future ground control systems
NASA Technical Reports Server (NTRS)
Matlin, Sam
1988-01-01
This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.
Obesity and high blood pressure of 12-hour night shift female clean-room workers.
Chen, Jong-Dar; Lin, Yu-Cheng; Hsiao, Shu-Tin
2010-01-01
The 12 h shift schedule is widely used in clean rooms for electronic semiconductor production in Taiwan. This study investigated the associations of obesity and metabolic syndrome (MetS) components among women working in a semiconductor manufacturing factory in North Taiwan. Workers were divided into four groups according to their work schedules and duties (i.e., office workers, day workers, fixed 12 h day shift, and fixed 12 h night shiftworkers). The subjects comprised 1838 women who voluntarily attended a health examination between August 2006 and November 2006. Their mean (+/-SD) age was 33.6 (+/-7.1) yrs and their mean duration of work was 7.4 (+/-5.2) yrs. Each subject's health-related behaviors, body mass index, and MetS components were measured and analyzed using multivariate logistic regression. Obesity and MetS were defined according to World Health Organization criteria for Asian populations and the National Cholesterol Educational Program and Adult Treatment Panel III Guidelines, respectively. The results showed that women working in the clean room on fixed 12 h night shifts had significantly elevated odds ratios for obesity (OR, 2.7; 95% CI, 1.6-4.5), central obesity (OR, 2.9; 95% CI, 1.7-5.1), and high blood pressure (OR, 2.3; 95% CI, 1.2-4.4) compared to female office workers; these results persisted after adjusting for age, smoking, drinking, education, and duration of work. We did not find any significant differences in triglyceride and high-density lipoprotein cholesterol among women working different schedules. We conclude that working fixed 12 h night shifts was associated with an increased odds ratio for obesity, central obesity, and high blood pressure among clean-room women workers. Weight reduction and blood pressure control programs should be implemented in the workplace for women working fixed 12 h night shifts.
Autonomous Hybrid Priority Queueing for Scheduling Residential Energy Demands
NASA Astrophysics Data System (ADS)
Kalimullah, I. Q.; Shamroukh, M.; Sahar, N.; Shetty, S.
2017-05-01
The advent of smart grid technologies has opened up opportunities to manage the energy consumption of the users within a residential smart grid system. Demand response management is particularly being employed to reduce the overall load on an electricity network which could in turn reduce outages and electricity costs. The objective of this paper is to develop an intelligible scheduler to optimize the energy available to a micro grid through hybrid queueing algorithm centered around the consumers’ energy demands. This is achieved by shifting certain schedulable load appliances to light load hours. Various factors such as the type of demand, grid load, consumers’ energy usage patterns and preferences are considered while formulating the logical constraints required for the algorithm. The algorithm thus obtained is then implemented in MATLAB workspace to simulate its execution by an Energy Consumption Scheduler (ECS) found within smart meters, which automatically finds the optimal energy consumption schedule tailor made to fit each consumer within the micro grid network.
Meta-RaPS Algorithm for the Aerial Refueling Scheduling Problem
NASA Technical Reports Server (NTRS)
Kaplan, Sezgin; Arin, Arif; Rabadi, Ghaith
2011-01-01
The Aerial Refueling Scheduling Problem (ARSP) can be defined as determining the refueling completion times for each fighter aircraft (job) on multiple tankers (machines). ARSP assumes that jobs have different release times and due dates, The total weighted tardiness is used to evaluate schedule's quality. Therefore, ARSP can be modeled as a parallel machine scheduling with release limes and due dates to minimize the total weighted tardiness. Since ARSP is NP-hard, it will be more appropriate to develop a pproimate or heuristic algorithm to obtain solutions in reasonable computation limes. In this paper, Meta-Raps-ATC algorithm is implemented to create high quality solutions. Meta-RaPS (Meta-heuristic for Randomized Priority Search) is a recent and promising meta heuristic that is applied by introducing randomness to a construction heuristic. The Apparent Tardiness Rule (ATC), which is a good rule for scheduling problems with tardiness objective, is used to construct initial solutions which are improved by an exchanging operation. Results are presented for generated instances.
Einsele, H; Hebart, H; Kauffmann-Schneider, C; Sinzger, C; Jahn, G; Bader, P; Klingebiel, T; Dietz, K; Löffler, J; Bokemeyer, C; Müller, C A; Kanz, L
2000-04-01
PCR-based preemptive therapy with ganciclovir has been shown to reduce the incidence of CMV disease after BMT. Failures of this treatment strategy are CMV disease and secondary non-viral infections. Eighty-six consecutive patients at high risk for CMV disease who received PCR-based preemptive therapy with ganciclovir were assessed for treatment failures and possible risk factors. Ganciclovir was initiated in 57 of 86 patients (66%). Only 28 of 86 (32%) patients received 4 or more weeks of ganciclovir. Recurrence of CMV infection after successful treatment was more frequent among recipients of a BMT from an unrelated compared to a sibling donor (P = 0.004). Three (3.5%) patients developed non-fatal early onset CMV disease and seven of 68 (10.3 %) late onset CMV disease (>100 days post transplant). Risk factors for late onset CMV disease were cGVHD (P = 0.0017) and duration of prior antiviral therapy >4 weeks (P = 0. 0073). The incidence of secondary non-viral infections was 28% with the duration of antiviral treatment being a significant risk factor for secondary bacterial (P = 0.0045) and invasive fungal infections (P = 0.006). Thus, PCR-based preemptive treatment with ganciclovir reduces early onset CMV disease, but the duration of antiviral therapy prior to day +100 is a significant risk factor for late onset CMV disease as well as secondary non-viral infections.
Antar, A; Otrock, Z K; Kharfan-Dabaja, M A; Ghaddara, H A; Kreidieh, N; Mahfouz, R; Bazarbachi, A
2015-06-01
The optimal stem cell mobilization regimen for patients with multiple myeloma (MM) remains undefined. We retrospectively compared our experience in hematopoietic cell mobilization in 83 MM patients using fractionated high-dose CY and G-CSF with G-CSF plus preemptive plerixafor. All patients in the CY group (n=56) received fractionated high-dose CY (5 g/m(2) divided into five doses of 1 g/m(2) every 3 h) with G-CSF. All patients in the plerixafor group (n=27) received G-CSF and plerixafor preemptively based on an established algorithm. Compared with plerixafor, CY use was associated with higher total CD34+ cell yield (7.5 × 10(6) vs 15.5 × 10(6) cells/kg, P=0.005). All patients in both groups yielded ⩾4 × 10(6) CD34+ cells/kg. Conversely, CY use was associated with high frequency of febrile neutropenia, blood and platelet transfusions need and hospitalizations. The average total cost of mobilization in Lebanon was slightly higher in the plerixafor group ($7886 vs $7536; P=0.16). Our data indicate robust stem cell mobilization in MM patients with either fractionated high-dose CY and G-CSF or G-CSF alone with preemptive plerixafor. The chemo-mobilization approach was associated with twofold stem cell yield, slightly lower cost but significantly increased toxicity.
Preemptive, preventive, multimodal analgesia: what do they really mean?
Rosero, Eric B; Joshi, Girish P
2014-10-01
To improve postoperative pain management, several concepts have been developed, including preemptive analgesia, preventive analgesia, and multimodal analgesia. This article will discuss the role of these concepts in improving perioperative pain management. Preemptive analgesia refers to the administration of an analgesic treatment before the surgical insult or tissue injury. Several randomized clinical trials have, however, provided equivocal evidence regarding the benefits of preincisional compared with postincisional analgesic administration. Current general consensus, therefore, indicates that use of preemptive analgesia does not translate into consistent clinical benefits after surgery. Preventive analgesia is a wider concept where the timing of analgesic administration in relation to the surgical incision is not critical. The aim of preventive analgesia is to minimize sensitization induced by noxious stimuli arising throughout the perioperative period. Multimodal analgesia consists of the administration of 2 or more drugs that act by different mechanisms for providing analgesia. These drugs may be administered via the same route or by different routes. Thus, the aim of multimodal analgesia is to improve pain relief while reducing opioid requirements and opioid-related adverse effects. Analgesic modalities currently available for postoperative pain control include opioids, local anesthetic techniques [local anesthetic infiltration, peripheral nerve blocks, and neuraxial blocks (epidural and paravertebral)], acetaminophen, nonsteroidal anti-inflammatory drugs, and cyclooxygenase-2-specific inhibitors as well as analgesic adjuncts such as steroids, ketamine, α-2 agonists, and anticonvulsants.
Game theory of pre-emptive vaccination before bioterrorism or accidental release of smallpox.
Molina, Chai; Earn, David J D
2015-06-06
Smallpox was eradicated in the 1970s, but new outbreaks could be seeded by bioterrorism or accidental release. Substantial vaccine-induced morbidity and mortality make pre-emptive mass vaccination controversial, and if vaccination is voluntary, then there is a conflict between self- and group interests. This conflict can be framed as a tragedy of the commons, in which herd immunity plays the role of the commons, and free-riding (i.e. not vaccinating pre-emptively) is analogous to exploiting the commons. This game has been analysed previously for a particular post-outbreak vaccination scenario. We consider several post-outbreak vaccination scenarios and compare the expected increase in mortality that results from voluntary versus imposed vaccination. Below a threshold level of post-outbreak vaccination effort, expected mortality is independent of the level of response effort. A lag between an outbreak starting and a response being initiated increases the post-outbreak vaccination effort necessary to reduce mortality. For some post-outbreak vaccination scenarios, even modest response lags make it impractical to reduce mortality by increasing post-outbreak vaccination effort. In such situations, if decreasing the response lag is impossible, the only practical way to reduce mortality is to make the vaccine safer (greater post-outbreak vaccination effort leads only to fewer people vaccinating pre-emptively). © 2015 The Author(s) Published by the Royal Society. All rights reserved.
Stepaniak, Pieter S; Vrijland, Wietske W; de Quelerij, Marcel; de Vries, Guus; Heij, Christiaan
2010-12-01
If variation in procedure times could be controlled or better predicted, the cost of surgeries could be reduced through improved scheduling of surgical resources. This study on the impact of similar consecutive cases on the turnover, surgical, and procedure times tests the perception that repeating the same manual tasks reduces the duration of these tasks. We hypothesize that when a fixed team works on similar consecutive cases the result will be shorter turnover and procedure duration as well as less variation as compared with the situation without a fixed team. Case-control study. St Franciscus Hospital, a large general teaching hospital in Rotterdam, the Netherlands. Two procedures, inguinal hernia repair and laparoscopic cholecystectomy, were selected and divided across a control group and a study group. Patients were randomly assigned to the study or control group. Preparation time, surgical time, procedure time, and turnover time. For inguinal hernia repair, we found a significantly lower preparation time and 10 minutes less procedure time in the study group, as compared with the control group. Variation in the study group was lower, as compared with the control group. For laparoscopic cholecystectomy, preparation time was significantly lower in the study group, as compared with the control group. For both procedures, there was a significant decrease in turnover time. Scheduling similar consecutive cases and performing with a fixed team results in lower turnover times and preparation times. The procedure time of the inguinal hernia repair decreased significantly and has practical scheduling implications. For more complex surgery, like laparoscopic cholecystectomy, there is no effect on procedure time.
Fixed-interval matching-to-sample: intermatching time and intermatching error runs1
Nelson, Thomas D.
1978-01-01
Four pigeons were trained on a matching-to-sample task in which reinforcers followed either the first matching response (fixed interval) or the fifth matching response (tandem fixed-interval fixed-ratio) that occurred 80 seconds or longer after the last reinforcement. Relative frequency distributions of the matching-to-sample responses that concluded intermatching times and runs of mismatches (intermatching error runs) were computed for the final matching responses directly followed by grain access and also for the three matching responses immediately preceding the final match. Comparison of these two distributions showed that the fixed-interval schedule arranged for the preferential reinforcement of matches concluding relatively extended intermatching times and runs of mismatches. Differences in matching accuracy and rate during the fixed interval, compared to the tandem fixed-interval fixed-ratio, suggested that reinforcers following matches concluding various intermatching times and runs of mismatches influenced the rate and accuracy of the last few matches before grain access, but did not control rate and accuracy throughout the entire fixed-interval period. PMID:16812032
A new task scheduling algorithm based on value and time for cloud platform
NASA Astrophysics Data System (ADS)
Kuang, Ling; Zhang, Lichen
2017-08-01
Tasks scheduling, a key part of increasing resource utilization and enhancing system performance, is a never outdated problem especially in cloud platforms. Based on the value density algorithm of the real-time task scheduling system and the character of the distributed system, the paper present a new task scheduling algorithm by further studying the cloud technology and the real-time system: Least Level Value Density First (LLVDF). The algorithm not only introduces some attributes of time and value for tasks, it also can describe weighting relationships between these properties mathematically. As this feature of the algorithm, it can gain some advantages to distinguish between different tasks more dynamically and more reasonably. When the scheme was used in the priority calculation of the dynamic task scheduling on cloud platform, relying on its advantage, it can schedule and distinguish tasks with large amounts and many kinds more efficiently. The paper designs some experiments, some distributed server simulation models based on M/M/C model of queuing theory and negative arrivals, to compare the algorithm against traditional algorithm to observe and show its characters and advantages.
A Study on Real-Time Scheduling Methods in Holonic Manufacturing Systems
NASA Astrophysics Data System (ADS)
Iwamura, Koji; Taimizu, Yoshitaka; Sugimura, Nobuhiro
Recently, new architectures of manufacturing systems have been proposed to realize flexible control structures of the manufacturing systems, which can cope with the dynamic changes in the volume and the variety of the products and also the unforeseen disruptions, such as failures of manufacturing resources and interruptions by high priority jobs. They are so called as the autonomous distributed manufacturing system, the biological manufacturing system and the holonic manufacturing system. Rule-based scheduling methods were proposed and applied to the real-time production scheduling problems of the HMS (Holonic Manufacturing System) in the previous report. However, there are still remaining problems from the viewpoint of the optimization of the whole production schedules. New procedures are proposed, in the present paper, to select the production schedules, aimed at generating effective production schedules in real-time. The proposed methods enable the individual holons to select suitable machining operations to be carried out in the next time period. Coordination process among the holons is also proposed to carry out the coordination based on the effectiveness values of the individual holons.
Enough Time to Do It All: How a New School Day will Help Spark a Renaissance for School Libraries
ERIC Educational Resources Information Center
Gabrielli, Christopher
2009-01-01
The traditional American school schedule of about 180 days and about six-and-a-half hours per day seems fixed in stone. It has not changed since World War II. The author and his colleague Warren Goldstein have written a book, "Time to Learn: How a New School Schedule Is Making Smarter Kids, Happier Parents, and Safer Neighborhoods", in…
U. S. fusion programs: Struggling to stay in the game
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, M.
Funding for the US fusion energy program has suffered and will probably continue to suffer major cuts. A committee hand-picked by Energy Secretary James Watkins urged the Department of Energy to mount an aggressive program to develop fusion power, but congress cut funding from $323 million in 1990 to $275 million in 1991. This portends dire conditions for fusion research and development. Projects to receive top priority are concerned with the tokamaks and to keep the next big machine, the Burning Plasma Experiment, scheduled for beginning of construction in 1993 on schedule. Secretary Watkins is said to want to keepmore » the International Thermonuclear Energy Reactor (ITER) on schedule. ITER would follow the Burning Plasma Experiment.« less
Constraint Maintenance with Preferences and Underlying Flexible Solution
NASA Technical Reports Server (NTRS)
Bresina, John; Jonsson, Ari; Morris, Paul; Rajan, Kanna
2003-01-01
This paper describes an aspect of the constraint reasoning mechanism. that is part of a ground planning system slated to be used for the Mars Exploration Rovers mission, where two rovers are scheduled to land on Mars in January of 2003. The planning system combines manual planning software from JPL with an automatic planning/scheduling system from NASA Ames Research Center, and is designed to be used in a mixed-initiative mode. Among other things, this means that after a plan has been produced, the human operator can perform extensive modifications under the supervision of the automated. system. For each modification to an activity, the automated system must adjust other activities as needed to ensure that constraints continue to be satisfied. Thus, the system must accommodate change in an interactive setting. Performance is of critical importance for interactive use. This is achieved by maintaining an underlying flexible solution to the temporal constraints, while the system presents a fixed schedule to the user. Adjustments are then a matter of constraint propagation rather than completely re-solving the problem. However, this begs the important question of which fixed schedule (among the ones sanctioned by the underlying flexible solution) should be presented to the user.Our approach uses least-change and other preferences as a prism through which the user views the flexible solution.
Daniels, Carter W; Sanabria, Federico
2017-03-01
The distribution of latencies and interresponse times (IRTs) of rats was compared between two fixed-interval (FI) schedules of food reinforcement (FI 30 s and FI 90 s), and between two levels of food deprivation. Computational modeling revealed that latencies and IRTs were well described by mixture probability distributions embodying two-state Markov chains. Analysis of these models revealed that only a subset of latencies is sensitive to the periodicity of reinforcement, and prefeeding only reduces the size of this subset. The distribution of IRTs suggests that behavior in FI schedules is organized in bouts that lengthen and ramp up in frequency with proximity to reinforcement. Prefeeding slowed down the lengthening of bouts and increased the time between bouts. When concatenated, latency and IRT models adequately reproduced sigmoidal FI response functions. These findings suggest that behavior in FI schedules fluctuates in and out of schedule control; an account of such fluctuation suggests that timing and motivation are dissociable components of FI performance. These mixture-distribution models also provide novel insights on the motivational, associative, and timing processes expressed in FI performance. These processes may be obscured, however, when performance in timing tasks is analyzed in terms of mean response rates.
Surveying School Facilities Needs.
ERIC Educational Resources Information Center
Weichel, Harry J.; Dennell, James
1990-01-01
Ralston (Nebraska) Public School District's communitywide survey helped set school facilities priorities while keeping the district's finite resources firmly in mind. With an outline of maintenance costs for the next 10 years, the district can develop a strategic construction schedule. The board also has the option of financing projects through a…
Positive Change through a Credential Process
ERIC Educational Resources Information Center
Williams, Tinnycua
2018-01-01
Studies have demonstrated the significance of afterschool staff development and have attempted to show the impacts of staff training on program quality and youth outcomes. Professional development, though necessary, wasn't always a priority for the author, especially if training hours conflicted with the author's afterschool program schedule.…
Austin Community College Comprehensive Master Plan, 2000-2001.
ERIC Educational Resources Information Center
Austin Community Coll., TX.
This document describes Austin Community College's (Texas) educational academic plans, facilities plans, and financial implementation plans for 2000-2001. Plan goals and priorities include: (1) enhancing scheduling efficiency while responding to unmet student demand and community needs, and increasing enrollments by 3-5%; (2) opening two…
Scheduling with hop-by-hop priority increasing in meshed optical burst-switched network
NASA Astrophysics Data System (ADS)
Chang, Hao; Luo, Jiangtao; Zhang, Zhizhong; Xia, Da; Gong, Jue
2006-09-01
In OBS, JET (Just-Enough-Time) is the classical wavelength reservation scheme. But there is a phenomenon that the burst priority decreasing hop-by-hop in multi-hop networks that will waste the bandwidth that was used in the upstream. Based on the HPI (Hop-by-hop Priority Increasing) proposed in the former research, this paper will do an unprecedented simulation in 4×4 meshed topology, which is closer to the real network environment with the help of a NS2-based OBSN simulation platform constructed by ourselves. By contrasting, the drop probability and throughput on one of the longest end-to-end path lengths in the whole networks, it shows that the HPI scheme can improve the utilance of bandwidth better.
Martinez, Valéria; Belbachir, Anissa; Jaber, Aithem; Cherif, Kamel; Jamal, Adel; Ozier, Yves; Sessler, Daniel I; Chauvin, Marcel; Fletcher, Dominique
2007-06-01
Parecoxib, a selective cyclooxygenase-2 inhibitor, may reduce postoperative pain without increasing bleeding when administered before surgery. We randomly assigned 62 patients scheduled for total hip arthroplasty to the following IV dosing schedule: 1) placebo at induction, at wound closure, and 12 h after induction (control); 2) parecoxib 40 mg at induction, placebo at wound closure, and parecoxib 40 mg 12 h after induction (pre); or, 3) placebo at induction, parecoxib 40 mg at wound closure, and parecoxib 40 mg 12 h after induction (post). Pain scores at rest and with movement were recorded every 4 h for 24 h using a visual analog scale. Treatment side effects were recorded every 4 h. Red cell loss for 5 days after surgery was calculated. Postoperative pain scores were less in the pre and post groups than in the control group. Postoperative bleeding was similar in the three groups. There were no significant differences between the pre and post groups, nor was their any trend suggesting a preemptive analgesic efficacy from preincision administration of parecoxib. Morphine use in the Postanesthesia Care Unit was reduced in the pre and post groups compared with the control group (14.2 +/- 2.0, and 15.7 +/- 2.0, vs 20.4 +/- 2.3 mg), although the trend was only significant (P < 0.05) in the pre group. The first pain score was also reduced in the pre and post groups compared to the control group (56.1 +/- 7.5 and 64.2 +/- 7.0 vs 78.3 +/- 5), but this was also only significant for the pre group (P = 0.001). The delay for first analgesic demand was increased for both the pre and post group compared to the control group (38 +/- 9 and 28.2 +/- 6.6 vs 18 +/- 6 min) but, again, this was only significant for the pre group (P = 0.05). Twenty-four hour consumption of morphine was similar in the pre (26 +/- 12 mg) and post groups (25 +/- 13 mg); both were significantly less than in the control group (47 +/- 27 mg, P < 0.001). Administration of parecoxib before hip arthroplasty did not provide preemptive analgesia. There was a trend towards improved analgesia immediately after surgery with preincision administration, consistent with the expected time course of nonsteroidal antiinflammatory drug's effect. Perioperative parecoxib administration, consisting of two injections spaced 12 h apart, improved postoperative analgesia over the first 24 h without increasing bleeding.
Martinez, Valéria; Belbachir, Anissa; Jaber, Aithem; Cherif, Kamel; Jamal, Adel; Ozier, Yves; Sessler, Daniel I.; Chauvin, Marcel; Fletcher, Dominique
2007-01-01
Background Parecoxib, a selective cyclooxygenase-2 inhibitor, may reduce postoperative pain when administered before surgery without increasing bleeding. Methods We randomly assigned 62 patients scheduled for total hip arthroplasty to the following intravenous dosing schedule: 1) placebo at induction, at wound closure, and 12 hours after induction (control); 2) parecoxib 40 mg at induction, placebo at wound closure, and parecoxib 40 mg 12 hours after induction (pre); or, 3) placebo at induction, parecoxib 40 mg at wound closure, and parecoxib 40 mg 12 hours after induction (post). Pain scores at rest and with movement recorded every 4 hours for 24 hours using a visual analog scale. Treatment side effects were recorded every 4 hours. Red cell loss for 5 days after surgery was calculated. Results Postoperative pain scores were less in pre and post groups than in the control group. Postoperative bleeding was similar in the three groups. There were no significant differences between pre and post groups, nor was their any trend suggesting a pre-emptive analgesic efficacy from preincision administration of parecoxib. Morphine use in the Post Anesthesia Care Unit was reduced in the pre and post groups compared with the control group (14.2±2.0, and 15.7±2.0, versus 20.4±2.3 mg), although the trend was only significant (p < 0.05) in the pre group. The first pain score was also reduced in the pre and post groups compared to the control group (56.1±7.5 and 64.2 ± 7.0 versus 78.3±5), but this was also only significant for the pre group (p=0.001). The delay for first analgesic demand was increased for both the pre and post group compared to the control group (38±9 and 28.2 ± 6.6 versus 18±6 min), but again this was only significant for the pre group (P=0.05). Twenty-four hour consumption of morphine was similar in the pre (26±12 mg) and post groups (25±13 mg); both of which were significantly less than control group (47±27 mg, P<0.001). Conclusions Administration of parecoxib before hip arthroplasty did not provide preemptive analgesia. There was a trend towards improved analgesia immediately after surgery with preincision administration, consistent with the expected time course of NSAID drug effect. Perioperative parecoxib administration, consisting of two injections spaced 12 hours apart, improved postoperative analgesia over the first 24 hours without increasing bleeding. PMID:17513652
Improving the Effect and Efficiency of FMD Control by Enlarging Protection or Surveillance Zones
Halasa, Tariq; Toft, Nils; Boklund, Anette
2015-01-01
An epidemic of foot-and-mouth disease (FMD) in a FMD-free country with large exports of livestock and livestock products would result in profound economic damage. This could be reduced by rapid and efficient control of the disease spread. The objectives of this study were to estimate the economic impact of a hypothetical FMD outbreak in Denmark based on changes to the economic assumptions of the model, and to investigate whether the control of an FMD epidemic can be improved by combining the enlargement of protection or surveillance zones with pre-emptive depopulation or emergency vaccination. The stochastic spatial simulation model DTU-DADS was used to simulate the spread of FMD in Denmark. The control strategies were the basic EU and Danish strategy, pre-emptive depopulation, suppressive or protective vaccination, enlarging protection or surveillance zones, and a combination of pre-emptive depopulation or emergency vaccination with enlarged protection or surveillance zones. Herds are detected either based on basic detection through the appearance of clinical signs, or as a result of surveillance in the control zones. The economic analyses consisted of direct costs and export losses. Sensitivity analysis was performed on uncertain and potentially influential input parameters. Enlarging the surveillance zones from 10 to 15 km, combined with pre-emptive depopulation over a 1-km radius around detected herds resulted in the lowest total costs. This was still the case even when the different input parameters were changed in the sensitivity analysis. Changing the resources for clinical surveillance did not affect the epidemic consequences. In conclusion, an FMD epidemic in Denmark would have a larger economic impact on the agricultural sector than previously anticipated. Furthermore, the control of a potential FMD outbreak in Denmark may be improved by combining pre-emptive depopulation with an enlarged protection or surveillance zone. PMID:26664996
Improving the Effect and Efficiency of FMD Control by Enlarging Protection or Surveillance Zones.
Halasa, Tariq; Toft, Nils; Boklund, Anette
2015-01-01
An epidemic of foot-and-mouth disease (FMD) in a FMD-free country with large exports of livestock and livestock products would result in profound economic damage. This could be reduced by rapid and efficient control of the disease spread. The objectives of this study were to estimate the economic impact of a hypothetical FMD outbreak in Denmark based on changes to the economic assumptions of the model, and to investigate whether the control of an FMD epidemic can be improved by combining the enlargement of protection or surveillance zones with pre-emptive depopulation or emergency vaccination. The stochastic spatial simulation model DTU-DADS was used to simulate the spread of FMD in Denmark. The control strategies were the basic EU and Danish strategy, pre-emptive depopulation, suppressive or protective vaccination, enlarging protection or surveillance zones, and a combination of pre-emptive depopulation or emergency vaccination with enlarged protection or surveillance zones. Herds are detected either based on basic detection through the appearance of clinical signs, or as a result of surveillance in the control zones. The economic analyses consisted of direct costs and export losses. Sensitivity analysis was performed on uncertain and potentially influential input parameters. Enlarging the surveillance zones from 10 to 15 km, combined with pre-emptive depopulation over a 1-km radius around detected herds resulted in the lowest total costs. This was still the case even when the different input parameters were changed in the sensitivity analysis. Changing the resources for clinical surveillance did not affect the epidemic consequences. In conclusion, an FMD epidemic in Denmark would have a larger economic impact on the agricultural sector than previously anticipated. Furthermore, the control of a potential FMD outbreak in Denmark may be improved by combining pre-emptive depopulation with an enlarged protection or surveillance zone.
Bielinski, Suzette J; Olson, Janet E; Pathak, Jyotishman; Weinshilboum, Richard M; Wang, Liewei; Lyke, Kelly J; Ryu, Euijung; Targonski, Paul V; Van Norstrand, Michael D; Hathcock, Matthew A; Takahashi, Paul Y; McCormick, Jennifer B; Johnson, Kiley J; Maschke, Karen J; Rohrer Vitek, Carolyn R; Ellingson, Marissa S; Wieben, Eric D; Farrugia, Gianrico; Morrisette, Jody A; Kruckeberg, Keri J; Bruflat, Jamie K; Peterson, Lisa M; Blommel, Joseph H; Skierka, Jennifer M; Ferber, Matthew J; Black, John L; Baudhuin, Linnea M; Klee, Eric W; Ross, Jason L; Veldhuizen, Tamra L; Schultz, Cloann G; Caraballo, Pedro J; Freimuth, Robert R; Chute, Christopher G; Kullo, Iftikhar J
2014-01-01
To report the design and implementation of the Right Drug, Right Dose, Right Time-Using Genomic Data to Individualize Treatment protocol that was developed to test the concept that prescribers can deliver genome-guided therapy at the point of care by using preemptive pharmacogenomics (PGx) data and clinical decision support (CDS) integrated into the electronic medical record (EMR). We used a multivariate prediction model to identify patients with a high risk of initiating statin therapy within 3 years. The model was used to target a study cohort most likely to benefit from preemptive PGx testing among the Mayo Clinic Biobank participants, with a recruitment goal of 1000 patients. We used a Cox proportional hazards model with variables selected through the Lasso shrinkage method. An operational CDS model was adapted to implement PGx rules within the EMR. The prediction model included age, sex, race, and 6 chronic diseases categorized by the Clinical Classifications Software for International Classification of Diseases, Ninth Revision codes (dyslipidemia, diabetes, peripheral atherosclerosis, disease of the blood-forming organs, coronary atherosclerosis and other heart diseases, and hypertension). Of the 2000 Biobank participants invited, 1013 (51%) provided blood samples, 256 (13%) declined participation, 555 (28%) did not respond, and 176 (9%) consented but did not provide a blood sample within the recruitment window (October 4, 2012, through March 20, 2013). Preemptive PGx testing included CYP2D6 genotyping and targeted sequencing of 84 PGx genes. Synchronous real-time CDS was integrated into the EMR and flagged potential patient-specific drug-gene interactions and provided therapeutic guidance. This translational project provides an opportunity to begin to evaluate the impact of preemptive sequencing and EMR-driven genome-guided therapy. These interventions will improve understanding and implementation of genomic data in clinical practice. Copyright © 2014 Mayo Foundation for Medical Education and Research. Published by Elsevier Inc. All rights reserved.
Randomized Controlled Trials to Define Viral Load Thresholds for Cytomegalovirus Pre-Emptive Therapy
Griffiths, Paul D.; Rothwell, Emily; Raza, Mohammed; Wilmore, Stephanie; Doyle, Tomas; Harber, Mark; O’Beirne, James; Mackinnon, Stephen; Jones, Gareth; Thorburn, Douglas; Mattes, Frank; Nebbia, Gaia; Atabani, Sowsan; Smith, Colette; Stanton, Anna; Emery, Vincent C.
2016-01-01
Background To help decide when to start and when to stop pre-emptive therapy for cytomegalovirus infection, we conducted two open-label randomized controlled trials in renal, liver and bone marrow transplant recipients in a single centre where pre-emptive therapy is indicated if viraemia exceeds 3000 genomes/ml (2520 IU/ml) of whole blood. Methods Patients with two consecutive viraemia episodes each below 3000 genomes/ml were randomized to continue monitoring or to immediate treatment (Part A). A separate group of patients with viral load greater than 3000 genomes/ml was randomized to stop pre-emptive therapy when two consecutive levels less than 200 genomes/ml (168 IU/ml) or less than 3000 genomes/ml were obtained (Part B). For both parts, the primary endpoint was the occurrence of a separate episode of viraemia requiring treatment because it was greater than 3000 genomes/ml. Results In Part A, the primary endpoint was not significantly different between the two arms; 18/32 (56%) in the monitor arm had viraemia greater than 3000 genomes/ml compared to 10/27 (37%) in the immediate treatment arm (p = 0.193). However, the time to developing an episode of viraemia greater than 3000 genomes/ml was significantly delayed among those randomized to immediate treatment (p = 0.022). In Part B, the primary endpoint was not significantly different between the two arms; 19/55 (35%) in the less than 200 genomes/ml arm subsequently had viraemia greater than 3000 genomes/ml compared to 23/51 (45%) among those randomized to stop treatment in the less than 3000 genomes/ml arm (p = 0.322). However, the duration of antiviral treatment was significantly shorter (p = 0.0012) in those randomized to stop treatment when viraemia was less than 3000 genomes/ml. Discussion The results illustrate that patients have continuing risks for CMV infection with limited time available for intervention. We see no need to alter current rules for stopping or starting pre-emptive therapy. PMID:27684379
Toward an Autonomous Telescope Network: the TBT Scheduler
NASA Astrophysics Data System (ADS)
Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.
2015-09-01
Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.
Code of Federal Regulations, 2010 CFR
2010-07-01
... obtained wherever possible. This is on the theory that the Government is buying title searching service as... Insurance Commission or some similar State agency. The premium fixed by such schedules, in most cases...
Enabling Technologies for Unified Life-Cycle Engineering of Structural Components
1991-03-22
representations for entities in the ULCE system for unambiguous, reliable, and efficient retrieval, manipulation, and transfer of data. Develop a rapid analysis...approaches to these functions. It is reasonable to assume that program budgets for future systems will be more restrictive and that fixed- price contracting...enemy threats, economics, and politics. The requirements are voluminous and may stipulate firm fixed- price proposals with detailed schedules. At this
Fixed or Rotating Night Shift Work Undertaken by Women: Implications for Fertility and Miscarriage.
Fernandez, Renae C; Marino, Jennifer L; Varcoe, Tamara J; Davis, Scott; Moran, Lisa J; Rumbold, Alice R; Brown, Hannah M; Whitrow, Melissa J; Davies, Michael J; Moore, Vivienne M
2016-03-01
This review summarizes the evidence concerning effects of night shift work on women's reproductive health, specifically difficulty in conceiving and miscarriage. We distinguish between fixed night shift and rotating night shift, as the population subgroups exposed, the social and biological mechanisms, and the magnitude of effects are likely to differ; of note, women working fixed night shift are known to have high tolerance for this schedule. We identified two relevant systematic reviews with meta-analyses and five additional studies. Night shift work may give rise to menstrual cycle disturbances, but effect sizes are imprecise. Endometriosis may be elevated in night shift workers, but evidence is only preliminary. Adequate data are lacking to assess associations between night shift work and infertility or time to pregnancy. The weight of evidence begins to point to working at night, whether in fixed or rotating shifts, as a risk factor for miscarriage. There are many methodological problems with this literature, with substantial variation in the definitions of night shift and schedule types making comparisons between studies difficult and pooling across studies questionable. Nevertheless, there appears to be grounds for caution and counselling where women have concerns about night shift work and their reproductive health. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.
Flight testing the fixed-wing configuration of the Rotor Systems Research Aircraft (RSRA)
NASA Technical Reports Server (NTRS)
Hall, G. W.; Morris, P. M.
1985-01-01
The Rotor Systems Research Aircraft (RSRA) is a unique research aircraft designed to flight test advanced helicopter rotor system. Its principal flight test configuration is as a compound helicopter. The fixed wing configuration of the RSRA was primarily considered an energy fly-home mode in the event it became necessary to sever an unstable rotor system in flight. While it had always been planned to flight test the fixed wing configuration, the selection of the RSRA as the flight test bed for the X-wing rotor accelerated this schedule. This paper discusses the build-up to, and the test of, the RSRA fixed wing configuration. It is written primarily from the test pilot's perspective.
Report of the Terrestrial Bodies Science Working Group. Volume 3: Venus
NASA Technical Reports Server (NTRS)
Kaula, W. M.; Malin, M. C.; Masursky, H.; Pettengill, G.; Prinn, R.; Young, R. E.
1977-01-01
The science objectives of Pioneer Venus and future investigations of the planet are discussed. Concepts and payloads for proposed missions and the supporting research and technology required to obtain the desired measurements from space and Earth-based observations are examined, as well as mission priorities and schedules.
Identifying Future Disease Hot Spots: Infectious Disease Vulnerability Index.
Moore, Melinda; Gelfeld, Bill; Okunogbe, Adeyemi; Paul, Christopher
2017-06-01
Recent high-profile outbreaks, such as Ebola and Zika, have illustrated the transnational nature of infectious diseases. Countries that are most vulnerable to such outbreaks might be higher priorities for technical support. RAND created the Infectious Disease Vulnerability Index to help U.S. government and international agencies identify these countries and thereby inform programming to preemptively help mitigate the spread and effects of potential transnational outbreaks. The authors employed a rigorous methodology to identify the countries most vulnerable to disease outbreaks. They conducted a comprehensive review of relevant literature to identify factors influencing infectious disease vulnerability. Using widely available data, the authors created an index for identifying potentially vulnerable countries and then ranked countries by overall vulnerability score. Policymakers should focus on the 25 most-vulnerable countries with an eye toward a potential "disease belt" in the Sahel region of Africa. The infectious disease vulnerability scores for several countries were better than what would have been predicted on the basis of economic status alone. This suggests that low-income countries can overcome economic challenges and become more resilient to public health challenges, such as infectious disease outbreaks.
An on-time power-aware scheduling scheme for medical sensor SoC-based WBAN systems.
Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk
2012-12-27
The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network-a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices.
An On-Time Power-Aware Scheduling Scheme for Medical Sensor SoC-Based WBAN Systems
Hwang, Tae-Ho; Kim, Dong-Sun; Kim, Jung-Guk
2013-01-01
The focus of many leading technologies in the field of medical sensor systems is on low power consumption and robust data transmission. For example, the implantable cardioverter-defibrillator (ICD), which is used to maintain the heart in a healthy state, requires a reliable wireless communication scheme with an extremely low duty-cycle, high bit rate, and energy-efficient media access protocols. Because such devices must be sustained for over 5 years without access to battery replacement, they must be designed to have extremely low power consumption in sleep mode. Here, an on-time, energy-efficient scheduling scheme is proposed that performs power adjustments to minimize the sleep-mode current. The novelty of this scheduler is that it increases the determinacy of power adjustment and the predictability of scheduling by employing non-pre-emptible dual priority scheduling. This predictable scheduling also guarantees the punctuality of important periodic tasks based on their serialization, by using their worst case execution time) and the power consumption optimization. The scheduler was embedded into a system on chip (SoC) developed to support the wireless body area network—a wakeup-radio and wakeup-timer for implantable medical devices. This scheduling system is validated by the experimental results of its performance when used with life-time extensions of ICD devices. PMID:23271602
Astronauts Brian Duffy, in commander's seat, and Winston E. Scott discuss their scheduled flight
NASA Technical Reports Server (NTRS)
1996-01-01
STS-72 TRAINING VIEW --- Astronauts Brian Duffy, in commander's seat, and Winston E. Scott discuss their scheduled flight aboard the Space Shuttle Endeavour. The two are on the flight deck of the Johnson Space Center's (JSC) fixed base Shuttle Mission Simulator (SMS). Duffy, mission commander, and Scott, mission specialist, will be joined for the winter flight by three other NASA astronauts and an international mission specialist representing NASDA.
Arizmendi, Luis; Ambite, Emilio J
2012-02-20
We used a digital feedback control loop system to produce reproducible fixed volume transmission holograms of high diffraction efficiency. Different strategies were investigated to obtain holograms of good quality and the highest refractive index modulation depth. Using this control system, we were able to record holograms with stationary fringes. Additionally to using the stationary fringe recording, a double recording-fixing schedule resulted in being the most appropriate one to produce reproducible holograms of better characteristics. This strategy is discussed and compared with other already established ones. © 2012 Optical Society of America
The influence of "preparedness" on autoshaping, schedule performance, and choice.
Burns, J D; Malone, J C
1992-11-01
Two groups of experimentally naive pigeons were exposed to an autoshaping procedure in which the response key was mounted on the wall (the conventional location) or on the floor of the chamber. In two experiments, subjects readily responded to the wall key, but floor-key subjects required shaping. A subsequent experiment compared performance of wall- and floor-key groups on an ascending series of fixed-ratio schedule values, resistance to extinction, differential reinforcement of other behavior, and reversal of key assignment. Each experiment was followed by several sessions of fixed-ratio training; the performance of the wall- and floor-key groups was almost identical throughout. In the final experiment, a fixed-ratio requirement could be completed on either or both keys. Birds initially chose the key on which they had responded during the preceding (reversal of key assignment) experiment. However, within a few sessions both groups showed almost exclusive preference for the floor key. Preference for a key located on the floor may follow from the fact that pigeons are ground feeders and may thus be more "prepared" to peck the floor than to peck a wall. However, autoshaping, under the conditions prevailing here, occurred much more readily to the wall key, suggesting that pecking a vertical surface is more highly prepared. Difficulties in determining relative preparedness seem moot, however, given the lack of between-group differences in the intervening experiments. It is thus unlikely that schedule performances critically depend upon the specific operant response involved.
A Semi-Preemptive Garbage Collector for Solid State Drives
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Junghee; Kim, Youngjae; Shipman, Galen M
2011-01-01
NAND flash memory is a preferred storage media for various platforms ranging from embedded systems to enterprise-scale systems. Flash devices do not have any mechanical moving parts and provide low-latency access. They also require less power compared to rotating media. Unlike hard disks, flash devices use out-of-update operations and they require a garbage collection (GC) process to reclaim invalid pages to create free blocks. This GC process is a major cause of performance degradation when running concurrently with other I/O operations as internal bandwidth is consumed to reclaim these invalid pages. The invocation of the GC process is generally governedmore » by a low watermark on free blocks and other internal device metrics that different workloads meet at different intervals. This results in I/O performance that is highly dependent on workload characteristics. In this paper, we examine the GC process and propose a semi-preemptive GC scheme that can preempt on-going GC processing and service pending I/O requests in the queue. Moreover, we further enhance flash performance by pipelining internal GC operations and merge them with pending I/O requests whenever possible. Our experimental evaluation of this semi-preemptive GC sheme with realistic workloads demonstrate both improved performance and reduced performance variability. Write-dominant workloads show up to a 66.56% improvement in average response time with a 83.30% reduced variance in response time compared to the non-preemptive GC scheme.« less
Economic analysis of emerald ash borer (Coleoptera: Buprestidae) management options.
Vannatta, A R; Hauer, R H; Schuettpelz, N M
2012-02-01
Emerald ash borer, Agrilus planipennis (Fairmaire) (Coleoptera: Buprestidae), plays a significant role in the health and extent of management of native North American ash species in urban forests. An economic analysis of management options was performed to aid decision makers in preparing for likely future infestations. Separate ash tree population valuations were derived from the i-Tree Streets program and the Council of Tree and Landscape Appraisers (CTLA) methodology. A relative economic analysis was used to compare a control option (do-nothing approach, only removing ash trees as they die) to three distinct management options: 1) preemptive removal of all ash trees over a 5 yr period, 2) preemptive removal of all ash trees and replacement with comparable nonash trees, or 3) treating the entire population of ash trees with insecticides to minimize mortality. For each valuation and management option, an annual analysis was performed for both the remaining ash tree population and those lost to emerald ash borer. Retention of ash trees using insecticide treatments typically retained greater urban forest value, followed by doing nothing (control), which was better than preemptive removal and replacement. Preemptive removal without tree replacement, which was the least expensive management option, also provided the lowest net urban forest value over the 20-yr simulation. A "no emerald ash borer" scenario was modeled to further serve as a benchmark for each management option and provide a level of economic justification for regulatory programs aimed at slowing the movement of emerald ash borer.
Fitzgerald, Anneke; Wu, Yong
2017-08-01
Objective This paper describes the perceptions of operating theatre staff in Australia and The Netherlands regarding the influence of logistical or operational reasons that may affect the scheduling of unplanned surgical cases. It is proposed that logistical or operational issues can influence the priority determination of queue position of surgical cases on the emergency waiting list. Methods A questionnaire was developed and conducted in 15 hospitals across The Netherlands and Australia, targeting anaesthetists, managers, nurses and surgeons. Statistical analyses revolved around these four professional groups. Six hypotheses were then developed and tested based on the responses collected from the participants. Results There were significant differences in perceptions of logistics delay factors across different professional groups when patients were waiting for unplanned surgery. There were also significant differences among different groups when setting logistical priority factors for planning and scheduling unplanned cases. The hypotheses tests confirm these differences, and the findings concur with the paradigmatic differences mentioned in the literature. These paradigmatic differences among the four professional groups may explain some of the tensions encountered when making decisions about scheduling emergency surgical queues, and therefore should be taken into consideration for management of operating theatres. Conclusions Queue positions of patients waiting for unplanned surgery, or emergency surgery, are determined by medical clinicians according to clinicians' indication of clinical priority. However, operating theatre managers are important in facilitating smooth operations when planning for emergency surgeries. It is necessary for surgeons to understand the logistical challenges faced by managers when requesting logistical priorities for their operations. What is known about the topic? Tensions exist about the efficient use of operating theatres and negotiating individual surgeon's demands, especially between surgeons and managers, because in many countries surgeons only work in the hospital and not for the hospital. What does this paper add? The present study examined the logistical effects on functionality and purports the notion that, while recognising the importance of clinical precedence, logistical factors influence queue order to ensure efficient use of operating theatre resources. What are the implications for practitioners? The results indicate that there are differences in the perceptions of healthcare professionals regarding the sequencing of emergency patients. These differences may lead to conflicts in the decision making process about triaging emergency or unplanned surgical cases. A clear understanding of the different perceptions of different functional groups may help address the conflicts that often arise in practice.
SciBox, an end-to-end automated science planning and commanding system
NASA Astrophysics Data System (ADS)
Choo, Teck H.; Murchie, Scott L.; Bedini, Peter D.; Steele, R. Josh; Skura, Joseph P.; Nguyen, Lillian; Nair, Hari; Lucks, Michael; Berman, Alice F.; McGovern, James A.; Turner, F. Scott
2014-01-01
SciBox is a new technology for planning and commanding science operations for Earth-orbital and planetary space missions. It has been incrementally developed since 2001 and demonstrated on several spaceflight projects. The technology has matured to the point that it is now being used to plan and command all orbital science operations for the MErcury Surface, Space ENvironment, GEochemistry, and Ranging (MESSENGER) mission to Mercury. SciBox encompasses the derivation of observing sequences from science objectives, the scheduling of those sequences, the generation of spacecraft and instrument commands, and the validation of those commands prior to uploading to the spacecraft. Although the process is automated, science and observing requirements are incorporated at each step by a series of rules and parameters to optimize observing opportunities, which are tested and validated through simulation and review. Except for limited special operations and tests, there is no manual scheduling of observations or construction of command sequences. SciBox reduces the lead time for operations planning by shortening the time-consuming coordination process, reduces cost by automating the labor-intensive processes of human-in-the-loop adjudication of observing priorities, reduces operations risk by systematically checking constraints, and maximizes science return by fully evaluating the trade space of observing opportunities to meet MESSENGER science priorities within spacecraft recorder, downlink, scheduling, and orbital-geometry constraints.
STS-72 crew trains in Fixed Base (FB) Shuttle Mission Simulator (SMS)
1995-06-07
S95-12716 (May 1995) --- Astronauts Brian Duffy, in commander's seat, and Winston E. Scott discuss their scheduled flight aboard the Space Shuttle Endeavour. The two are on the flight deck of the Johnson Space Center's (JSC) fixed base Shuttle Mission Simulator (SMS). Duffy, mission commander, and Scott, mission specialist, will be joined for the winter flight by three other NASA astronauts and an international mission specialist representing NASDA.
STS-72 crew trains in Fixed Base (FB) Shuttle Mission Simulator (SMS)
1995-06-07
S95-12711 (May 1995) --- Astronaut Leroy Chiao, assigned as mission specialist for the STS-72 mission, prepares to ascend stairs to the flight deck of the fixed base Shuttle Mission Simulator (SMS) at the Johnson Space Center (JSC). Chiao will join an international mission specialist and four other NASA astronauts aboard the Space Shuttle Endeavour for a scheduled nine-day mission, now set for the winter of this year.
Strategic behavior, workload, and performance in task scheduling
NASA Technical Reports Server (NTRS)
Moray, Neville; Dessouky, Mohamed I.; Kijowski, Brian A.; Adapathya, Ravi
1991-01-01
Scheduling theory is proposed as a normative model for strategic behavior when operators are confronted by several tasks, all of which should be completed within a fixed time span, and when they are free to choose the order in which the tasks should be done. Three experiments are described to investigate the effect of knowing the correct scheduling rule on the efficiency of performance, subjective workload, and choice of strategy under different conditions of time pressure. The most potent effects are from time pressure. The reasons for the weak effect of knowing the rules are discussed, and implications for strategic behavior, displays, and decision aids are indicated.
Market-Based Approaches to Managing Science Return from Planetary Missions
NASA Technical Reports Server (NTRS)
Wessen, Randii R.; Porter, David; Hanson, Robin
1996-01-01
A research plan is described for the design and testing of a method for the planning and negotiation of science observations. The research plan is presented in relation to the fact that the current method, which involves a hierarchical process of science working groups, is unsuitable for the planning of the Cassini mission. The research plan involves the market-based approach in which participants are allocated budgets of scheduling points. The points are used to provide an intensity of preference for the observations being scheduled. In this way, the schedulers do not have to limit themselves to solving major conflicts, but try to maximize the number of scheduling points that result in a conflict-free timeline. Incentives are provided for the participants by the fixed budget concerning their tradeoff decisions. A degree of feedback is provided in the process so that the schedulers may rebid based on the current timeline.
Controversies in rabies vaccination.
Ghosh, Tapan Kr
2003-06-01
Rabies is a cent per cent fatal disease and there should not be any controversy in giving rabies vaccine to the victims. WHO has fixed schedules for doses for both pre and post-exposure in different category of cases, which also help us to avoid all controversies. But controversies arise in five main areas, which are related to the strategies of rabies prevention. These are: (i) Replacing use of NTV by MTCV. (ii) Intradermal schedule of MTCV, in place of Essen protocol of 5 i.m. doses to reduce the cost. (iii) Acceptability and inclusion of pre-exposure doses of MTCV in the immunization schedule of children as additional vaccine (iv) Schedule for re-exposure in already post-exposure vaccinated cases and schedule for exposure in pre-exposure vaccinated cases. (v) Uses of RIG in WHO category III cases. If these controversial issues are considered scientifically, rabies prophylaxis will see the light of success.
Request-Driven Schedule Automation for the Deep Space Network
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol
2010-01-01
The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.
Integration of multimodal transportation services : final report.
DOT National Transportation Integrated Search
2016-03-08
Flexible route paratransit services may complement as well as compete with conventional public transportation services (that : have fixed routes and schedules). Flexible routes are especially suitable for service areas or time periods with low demand...
DOT National Transportation Integrated Search
2006-06-01
The Chittenden County Transportation Authority (CCTA) was founded in 1973 by the Vermont Legislature and provides transit services in northwestern Vermont. CCTA is a full service public transportation provider, offering services including fixed route...
DOT National Transportation Integrated Search
1996-12-02
THE PURPOSE OF THIS DOCUMENT IS TO PROVIDE INFORMATION ON THE PLANNING FOR THE DEVELOPMENT AND DEPLOYMENT OF EDI STANDARDS FOR COMMERCIAL VEHICLE INFORMATION SYSTEMS AND NETWORKS (CVISN). THE STATUS, PRIORITIES, AND SCHEDULES FOR THIS EFFORT ARE CONT...
Never Been KIST: Tor’s Congestion Management Blossoms with Kernel-Informed Socket Transport
2014-08-01
when compared to vanilla Tor. Outline of Major Contributions: We outline our major contributions as follows: – in Section 3 we discuss improvements to...experiments. We tested vanilla Tor us- ing the default CircuitPriorityHalflife of 30, the global scheduling part of KIST (without enforcing the write limits
Real-time design with peer tasks
NASA Technical Reports Server (NTRS)
Goforth, Andre; Howes, Norman R.; Wood, Jonathan D.; Barnes, Michael J.
1995-01-01
We introduce a real-time design methodology for large scale, distributed, parallel architecture, real-time systems (LDPARTS), as an alternative to those methods using rate or dead-line monotonic analysis. In our method the fundamental units of prioritization, work items, are domain specific objects with timing requirements (deadlines) found in user's specification. A work item consists of a collection of tasks of equal priority. Current scheduling theories are applied with artifact deadlines introduced by the designer whereas our method schedules work items to meet user's specification deadlines (sometimes called end-to-end deadlines). Our method supports these scheduling properties. Work item scheduling is based on domain specific importance instead of task level urgency and still meets as many user specification deadlines as can be met by scheduling tasks with respect to urgency. Second, the minimum (closest) on-line deadline that can be guaranteed for a work item of highest importance, scheduled at run time, is approximately the inverse of the throughput, measured in work items per second. Third, throughput is not degraded during overload and instead of resorting to task shedding during overload, the designer can specify which work items to shed. We prove these properties in a mathematical model.
Chip-set for quality of service support in passive optical networks
NASA Astrophysics Data System (ADS)
Ringoot, Edwin; Hoebeke, Rudy; Slabbinck, B. Hans; Verhaert, Michel
1998-10-01
In this paper the design of a chip-set for QoS provisioning in ATM-based Passive Optical Networks is discussed. The implementation of a general-purpose switch chip on the Optical Network Unit is presented, with focus on the design of the cell scheduling and buffer management logic. The cell scheduling logic supports `colored' grants, priority jumping and weighted round-robin scheduling. The switch chip offers powerful buffer management capabilities enabling the efficient support of GFR and UBR services. Multicast forwarding is also supported. In addition, the architecture of a MAC controller chip developed for a SuperPON access network is introduced. In particular, the permit scheduling logic and its implementation on the Optical Line Termination will be discussed. The chip-set enables the efficient support of services with different service requirements on the SuperPON. The permit scheduling logic built into the MAC controller chip in combination with the cell scheduling and buffer management capabilities of the switch chip can be used by network operators to offer guaranteed service performance to delay sensitive services, and to efficiently and fairly distribute any spare capacity to delay insensitive services.
Omino, T
1993-01-01
Pigeons were exposed to a concurrent-chains schedule in which a single variable-interval 30-s schedule was used in the initial links and fixed-time schedules were used in the terminal links. Three types of keylight conditions were used in the terminal links. In the first condition, different delays were associated with different keylight stimuli (cued condition). In the second condition, different delays were associated with the same stimulus, either a blackout (uncued blackout condition) or a white key (uncued white condition). Paired values of terminal-link fixed-time schedules differed by a constant ratio of 3:1, while the absolute value of delays was varied from 3 s to 54 s. The results showed that choice proportions for the shorter of two delays increased when the absolute size of the delays was increased for all keylight conditions. Further, the choice proportions for the shorter delay increased from the uncued blackout condition, to the uncued white condition, to the cued condition. A modified version of Fantino's (1969) delay-reduction model (expressed as a function relating the response ratio to the delay-reduction ratio) can be applied to these data by showing that sensitivity to delay reduction increased from the uncued blackout condition, to the uncued white condition, to the cued condition. Thus, the present study demonstrated that a modified version of the delay-reduction model can be used to assess quantitative differences in the terminal-link keylight condition in terms of sensitivity to delay reduction (i.e., the conditioned reinforcing value of the terminal-link keylight stimuli). PMID:8283150
Buckley, Scott D; Newchok, Debra K
2005-01-01
We investigated the effects of response effort on the use of mands during functional communication training (FCT) in a participant with autism. The number of links in a picture exchange response chain determined two levels of response effort. Each level was paired with a fixed ratio (FR3) schedule of reinforcement for aggression in a reversal design. Responding to either schedule produced access to a preferred item. The participant opted for the low effort mand while aggression decreased significantly. However, the high effort mand did not compete with the FR3 schedule for aggression. Results are discussed in terms of response effort within a response chain of a picture exchange system and competing ratio schedules for problem behavior during mand training.
Dynamic autonomous routing technology for IP-based satellite ad hoc networks
NASA Astrophysics Data System (ADS)
Wang, Xiaofei; Deng, Jing; Kostas, Theresa; Rajappan, Gowri
2014-06-01
IP-based routing for military LEO/MEO satellite ad hoc networks is very challenging due to network and traffic heterogeneity, network topology and traffic dynamics. In this paper, we describe a traffic priority-aware routing scheme for such networks, namely Dynamic Autonomous Routing Technology (DART) for satellite ad hoc networks. DART has a cross-layer design, and conducts routing and resource reservation concurrently for optimal performance in the fluid but predictable satellite ad hoc networks. DART ensures end-to-end data delivery with QoS assurances by only choosing routing paths that have sufficient resources, supporting different packet priority levels. In order to do so, DART incorporates several resource management and innovative routing mechanisms, which dynamically adapt to best fit the prevailing conditions. In particular, DART integrates a resource reservation mechanism to reserve network bandwidth resources; a proactive routing mechanism to set up non-overlapping spanning trees to segregate high priority traffic flows from lower priority flows so that the high priority flows do not face contention from low priority flows; a reactive routing mechanism to arbitrate resources between various traffic priorities when needed; a predictive routing mechanism to set up routes for scheduled missions and for anticipated topology changes for QoS assurance. We present simulation results showing the performance of DART. We have conducted these simulations using the Iridium constellation and trajectories as well as realistic military communications scenarios. The simulation results demonstrate DART's ability to discriminate between high-priority and low-priority traffic flows and ensure disparate QoS requirements of these traffic flows.
de Almeida-Pedrin, Renata Rodrigues; Henriques, José Fernando Castanha; de Almeida, Renato Rodrigues; de Almeida, Marcio Rodrigues; McNamara, James A
2009-12-01
In this retrospective study, we compared the cephalometric effects, the dental-arch changes, and the efficiency of Class II treatment with the pendulum appliance, cervical headgear, or extraction of 2 maxillary premolars, all associated with fixed appliance therapy. The sample of 82 patients with Class II malocclusion was divided into 3 groups: group 1 patients (n = 22; treatment time, 3.8 years) were treated with the pendulum appliance and fixed orthodontic appliances. Group 2 patients (n = 30; treatment time, 3.2 years) were treated with cervical headgear followed by fixed appliances; group 3 patients (n = 30; treatment time, 2.1 years) were treated with 2 maxillary premolar extractions and fixed appliances. The average starting ages of the groups ranged from 13.2 to 13.8 years. Data were obtained from serial cephalometric measurements and dental casts. The dental casts were analyzed with the treatment priority index. The treatment efficiency index was also used. The 3 treatment protocols produced similar cephalometric effects, especially skeletally. Comparisons among the 2 distalizing appliances (pendulum and cervical headgear) and extraction of 2 maxillary premolars for Class II treatment showed changes primarily in the maxillary dentoalveolar component and dental relationships. The facial profile was similar after treatment, except for slightly more retrusion of the upper lip in the extraction patients. The treatment priority index demonstrated that occlusal outcomes also were similar among the groups. The treatment efficiency index had higher values for the extraction group. The effects of treatment with the pendulum appliance or cervical headgear and extraction of 2 maxillary premolars associated with fixed appliances were similar from both occlusal and cephalometric standpoints. Class II treatment with extraction of maxillary teeth was more efficient because of the shorter treatment time. Differences in maxillary incisor retraction should be noted, but these differences might have been due to greater maxillary dentoalveolar protrusion in the extraction group before treatment.
STS-72 crew trains in Fixed Base (FB) Shuttle Mission Simulator (SMS)
1995-06-07
S95-12706 (May 1995) --- Astronaut Koichi Wakata, representing Japan's National Space Development Agency (NASDA) and assigned as mission specialist for the STS-72 mission, checks over a copy of the flight plan. Wakata is on the flight deck of the fixed base Shuttle Mission Simulator (SMS) at the Johnson Space Center (JSC). He will join five NASA astronauts aboard Endeavour for a scheduled nine-day mission, now set for the winter of this year.
Modeling and Control of a Fixed Wing Tilt-Rotor Tri-Copter
NASA Astrophysics Data System (ADS)
Summers, Alexander
The following thesis considers modeling and control of a fixed wing tilt-rotor tri-copter. An emphasis of the conceptual design is made toward payload transport. Aerodynamic panel code and CAD design provide the base aerodynamic, geometric, mass, and inertia properties. A set of non-linear dynamics are created considering gravity, aerodynamics in vertical takeoff and landing (VTOL) and forward flight, and propulsion applied to a three degree of freedom system. A transition strategy, that removes trajectory planning by means of scheduled inputs, is theorized. Three discrete controllers, utilizing separate control techniques, are applied to ensure stability in the aerodynamic regions of VTOL, transition, and forward flight. The controller techniques include linear quadratic regulation, full state integral action, gain scheduling, and proportional integral derivative (PID) flight control. Simulation of the model control system for flight from forward to backward transition is completed with mass and center of gravity variation.
Petrelli, F; Borgonovo, K; Cabiddu, M; Coinu, A; Ghilardi, M; Lonati, V; Barni, S
2016-12-01
Topical and systemic prophylactic measures, which are administered before the development of epidermal growth factor receptor (EGFR)-related acneiform rash, are appropriate interventions to mitigate the intensity of skin toxicity. We have performed a systematic review and meta-analysis to evaluate whether prophylactic antibiotics may reduce the occurrence and severity of anti-EGFR drug-related skin rashes. A systematic review was performed by searching Medline, Scopus, Embase, CINAHL, LILACS, Web of Science and the Cochrane Library from inception until March 2016 for publications regarding the pre-emptive role of antibiotics for EGFR-induced skin rashes. Fixed- or random-effects meta-analyses, according to heterogeneity, were used to summarize odds ratios of skin toxicity with antibiotic use. Of the 827 citations found in the search, 13 studies comprising 1073 patients were included in the analysis. In 12 studies, patients in the prophylactic antibiotic arms had a lower risk of developing a skin rash (odds ratio 0·53, 95% confidence interval 0·39-0·72, P < 0·01) than patients without antibiotic prophylaxis. In particular, moderate-to-severe toxicities (grades 2-4) were reduced by nearly two-thirds (odds ratio 0·36, 95% confidence interval 0·22-0·60, P < 0·01) in 13 studies. This translated to a 26% absolute difference of high-grade skin rash compared with the control arms (from 50% to 24%). The results of this meta-analysis show that the risk of skin rash after treatment with anti-EGFR agents for solid tumours was significantly lower in patients taking prophylaxis with antibiotics than in those who were not. Therefore, taking pre-emptive tetracyclines for several weeks at the start of anti-EGFR treatment can significantly reduce the incidence and severity of cutaneous acneiform rash. © 2016 British Association of Dermatologists.
Harhay, Meera N; Xie, Dawei; Zhang, Xiaoming; Hsu, Chi-Yuan; Vittinghoff, Eric; Go, Alan S; Sozio, Stephen M; Blumenthal, Jacob; Seliger, Stephen; Chen, Jing; Deo, Rajat; Dobre, Mirela; Akkina, Sanjeev; Reese, Peter P; Lash, James P; Yaffe, Kristine; Tamura, Manjula Kurella
2018-05-02
Advanced chronic kidney disease is associated with elevated risk for cognitive impairment. However, it is not known whether and how cognitive impairment is associated with planning and preparation for end-stage renal disease. Retrospective observational study. 630 adults participating in the CRIC (Chronic Renal Insufficiency Cohort) Study who had cognitive assessments in late-stage CKD, defined as estimated glome-rular filtration rate ≤ 20mL/min/1.73m 2 , and subsequently initiated maintenance dialysis therapy. Predialysis cognitive impairment, defined as a score on the Modified Mini-Mental State Examination lower than previously derived age-based threshold scores. Covariates included age, race/ethnicity, educational attainment, comorbid conditions, and health literacy. Peritoneal dialysis (PD) as first dialysis modality, preemptive permanent access placement, venous catheter avoidance at dialysis therapy initiation, and preemptive wait-listing for a kidney transplant. Multivariable-adjusted logistic regression. Predialysis cognitive impairment was present in 117 (19%) participants. PD was the first dialysis modality among 16% of participants (n=100), 75% had preemptive access placed (n=473), 45% avoided using a venous catheter at dialysis therapy initiation (n=279), and 20% were preemptively wait-listed (n=126). Predialysis cognitive impairment was independently associated with 78% lower odds of PD as the first dialysis modality (adjusted OR [aOR], 0.22; 95% CI, 0.06-0.74; P=0.02) and 42% lower odds of venous catheter avoidance at dialysis therapy initiation (aOR, 0.58; 95% CI, 0.34-0.98; P=0.04). Predialysis cognitive impairment was not independently associated with preemptive permanent access placement or wait-listing. Potential unmeasured confounders; single measure of cognitive function. Predialysis cognitive impairment is associated with a lower likelihood of PD as a first dialysis modality and of venous catheter avoidance at dialysis therapy initiation. Future studies may consider addressing cognitive function when testing strategies to improve patient transitions to dialysis therapy. Copyright © 2018 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.
Grepperud, Sverre; Holman, Per Arne; Wangen, Knut Reidar
2014-12-14
Clinicians at Norwegian community mental health centres assess referrals from general practitioners and classify them into three priority groups (high priority, low priority, and refusal) according to need where need is defined by three prioritization criteria (severity, effect, and cost-effectiveness). In this study, we seek to operationalize the three criteria and analyze to what extent they have an effect on clinical-level priority setting after controlling for clinician characteristics and organisational factors. Twenty anonymous referrals were rated by 42 admission team members employed at 14 community mental health centres in the South-East Health Region of Norway. Intra-class correlation coefficients were calculated and logistic regressions were performed. Variation in clinicians' assessments of the three criteria was highest for effect and cost-effectiveness. An ordered logistic regression model showed that all three criteria for prioritization, three clinician characteristics (education, being a manager or not, and "guideline awareness"), and the centres themselves (fixed effects), explained priority decisions. The relative importance of the explanatory factors, however, depended on the priority decision studied. For the classification of all admitted patients into high- and low-priority groups, all clinician characteristics became insignificant. For the classification of patients, into those admitted and non-admitted, one criterion (effect) and "being a manager or not" became insignificant, while profession ("being a psychiatrist") became significant. Our findings suggest that variation in priority decisions can be reduced by: (i) reducing the disagreement in clinicians' assessments of cost-effectiveness and effect, and (ii) restricting priority decisions to clinicians with a similar background (education, being a manager or not, and "guideline awareness").
A hierarchically distributed architecture for fault isolation expert systems on the space station
NASA Technical Reports Server (NTRS)
Miksell, Steve; Coffer, Sue
1987-01-01
The Space Station Axiomatic Fault Isolating Expert Systems (SAFTIES) system deals with the hierarchical distribution of control and knowledge among independent expert systems doing fault isolation and scheduling of Space Station subsystems. On its lower level, fault isolation is performed on individual subsystems. These fault isolation expert systems contain knowledge about the performance requirements of their particular subsystem and corrective procedures which may be involved in repsonse to certain performance errors. They can control the functions of equipment in their system and coordinate system task schedules. On a higher level, the Executive contains knowledge of all resources, task schedules for all systems, and the relative priority of all resources and tasks. The executive can override any subsystem task schedule in order to resolve use conflicts or resolve errors that require resources from multiple subsystems. Interprocessor communication is implemented using the SAFTIES Communications Interface (SCI). The SCI is an application layer protocol which supports the SAFTIES distributed multi-level architecture.
NASA Astrophysics Data System (ADS)
Chawla, Viveak Kumar; Chanda, Arindam Kumar; Angra, Surjit
2018-03-01
The flexible manufacturing system (FMS) constitute of several programmable production work centers, material handling systems (MHSs), assembly stations and automatic storage and retrieval systems. In FMS, the automatic guided vehicles (AGVs) play a vital role in material handling operations and enhance the performance of the FMS in its overall operations. To achieve low makespan and high throughput yield in the FMS operations, it is highly imperative to integrate the production work centers schedules with the AGVs schedules. The Production schedule for work centers is generated by application of the Giffler and Thompson algorithm under four kind of priority hybrid dispatching rules. Then the clonal selection algorithm (CSA) is applied for the simultaneous scheduling to reduce backtracking as well as distance travel of AGVs within the FMS facility. The proposed procedure is computationally tested on the benchmark FMS configuration from the literature and findings from the investigations clearly indicates that the CSA yields best results in comparison of other applied methods from the literature.
NASA Technical Reports Server (NTRS)
Robinson, John E.
2014-01-01
The Federal Aviation Administration's Next Generation Air Transportation System will combine advanced air traffic management technologies, performance-based procedures, and state-of-the-art avionics to maintain efficient operations throughout the entire arrival phase of flight. Flight deck Interval Management (FIM) operations are expected to use sophisticated airborne spacing capabilities to meet precise in-trail spacing from top-of-descent to touchdown. Recent human-in-the-loop simulations by the National Aeronautics and Space Administration have found that selection of the assigned spacing goal using the runway schedule can lead to premature interruptions of the FIM operation during periods of high traffic demand. This study compares three methods for calculating the assigned spacing goal for a FIM operation that is also subject to time-based metering constraints. The particular paradigms investigated include: one based upon the desired runway spacing interval, one based upon the desired meter fix spacing interval, and a composite method that combines both intervals. These three paradigms are evaluated for the primary arrival procedures to Phoenix Sky Harbor International Airport using the entire set of Rapid Update Cycle wind forecasts from 2011. For typical meter fix and runway spacing intervals, the runway- and meter fix-based paradigms exhibit moderate FIM interruption rates due to their inability to consider multiple metering constraints. The addition of larger separation buffers decreases the FIM interruption rate but also significantly reduces the achievable runway throughput. The composite paradigm causes no FIM interruptions, and maintains higher runway throughput more often than the other paradigms. A key implication of the results with respect to time-based metering is that FIM operations using a single assigned spacing goal will not allow reduction of the arrival schedule's excess spacing buffer. Alternative solutions for conducting the FIM operation in a manner more compatible with the arrival schedule are discussed in detail.
Evenden, John; Ko, Tracey
2007-02-01
Many similarities exist between the overconsumption of food, which results in obesity, and drug addiction. The present study investigated the effects of anorectic drugs on responding maintained by high incentive, but nutritionally unnecessary, food reinforcers using an FI15(fixed-ratio 10:S) schedule of reinforcement, similar to that used in studies on the incentive properties of drugs of abuse. Rats were trained to respond on a lever to gain access to two high incentive foods--chocolate chip cookies and cheese. Under the FI15(FR10:S) schedule, every 10th response (fixed-ratio 10) delivered a tone and light conditioned stimulus. The first ratio completed 15 min after the start of the session produced the conditioned stimulus and opened a door to give access to a piece of cookie. After 5 min to consume the high incentive food, a second 15-min interval was started, terminating in access to a second reinforcer, cheese. Once trained, the rats were given free access to laboratory chow in the home cage. They continued to work for the high incentive foods for a period of over 1 year, showing a pattern of responding appropriate to an FI(fixed-ratio) schedule. Naloxone (1.0 mg/kg), fenfluramine (1 and 2 mg/kg), D-amphetamine (0.25 and 0.5 mg/kg), and rimonabant (3 mg/kg) significantly reduced responding, especially in the second interval. In contrast, complete removal of the high incentive food from the test procedure did not immediately reduce the rate of responding, tending to increase it in the second of the intervals. Apparently, the drugs did not reduce responding by reducing the experienced magnitude of the high incentive food, but more probably by reducing the animals' motivation.
Response-reinforcer dependency and resistance to change.
Cançado, Carlos R X; Abreu-Rodrigues, Josele; Aló, Raquel Moreira; Hauck, Flávia; Doughty, Adam H
2018-01-01
The effects of the response-reinforcer dependency on resistance to change were studied in three experiments with rats. In Experiment 1, lever pressing produced reinforcers at similar rates after variable interreinforcer intervals in each component of a two-component multiple schedule. Across conditions, in the fixed component, all reinforcers were response-dependent; in the alternative component, the percentage of response-dependent reinforcers was 100, 50 (i.e., 50% response-dependent and 50% response-independent) or 10% (i.e., 10% response-dependent and 90% response-independent). Resistance to extinction was greater in the alternative than in the fixed component when the dependency in the former was 10%, but was similar between components when this dependency was 100 or 50%. In Experiment 2, a three-component multiple schedule was used. The dependency was 100% in one component and 10% in the other two. The 10% components differed on how reinforcers were programmed. In one component, as in Experiment 1, a reinforcer had to be collected before the scheduling of other response-dependent or independent reinforcers. In the other component, response-dependent and -independent reinforcers were programmed by superimposing a variable-time schedule on an independent variable-interval schedule. Regardless of the procedure used to program the dependency, resistance to extinction was greater in the 10% components than in the 100% component. These results were replicated in Experiment 3 in which, instead of extinction, VT schedules replaced the baseline schedules in each multiple-schedule component during the test. We argue that the relative change in dependency from Baseline to Test, which is greater when baseline dependencies are high rather than low, could account for the differential resistance to change in the present experiments. The inconsistencies in results across the present and previous experiments suggest that the effects of dependency on resistance to change are not well understood. Additional systematic analyses are important to further understand the effects of the response-reinforcer relation on resistance to change and to the development of a more comprehensive theory of behavioral persistence. © 2017 Society for the Experimental Analysis of Behavior.
Assessment of Delivery Accuracy in an Operational-Like Environment
NASA Technical Reports Server (NTRS)
Sharma, Shivanjli; Wynnyk, Mitch
2016-01-01
In order to enable arrival management concepts and solutions in a Next Generation Air Transportation System (NextGen) environment, ground-based sequencing and scheduling functions were developed to support metering operations in the National Airspace System. These sequencing and scheduling tools are designed to assist air traffic controllers in developing an overall arrival strategy, from enroute down to the terminal area boundary. NASA developed a ground system concept and protoype capability called Terminal Sequencing and Spacing (TSAS) to extend metering operations into the terminal area to the runway. To demonstrate the use of these scheduling and spacing tools in an operational-like environment, the FAA, NASA, and MITRE conducted an Operational Integration Assessment (OIA) of a prototype TSAS system at the FAA's William J. Hughes Technical Center (WJHTC). This paper presents an analysis of the arrival management strategies utilized and delivery accuracy achieved during the OIA. The analysis demonstrates how en route preconditioning, in various forms, and schedule disruptions impact delivery accuracy. As the simulation spanned both enroute and terminal airspace, the use of Ground Interval Management - Spacing (GIM-S) enroute speed advisories was investigated. Delivery accuracy was measured as the difference between the Scheduled Time of Arrival (STA) and the Actual Time of Arrival (ATA). The delivery accuracy was computed across all runs conducted during the OIA, which included deviations from nominal operations which are known to commonly occur in real operations, such as schedule changes and missed approaches. Overall, 83% of all flights were delivered into the terminal airspace within +/- 30 seconds of their STA and 94% of flights were delivered within +/- 60 seconds. The meter fix delivery accuracy standard deviation was found to be between 36 and 55 seconds across all arrival procedures. The data also showed when schedule disruptions were excluded, the percentage of aircraft delivered within +/- 30 seconds was between 85 and 90% across the various arrival procedures at the meter fix. This paper illustrates the ability to meet new delivery accuracy requirements in an operational-like environment using operational systems and NATCA controller participants, while also including common events that might cause disruptions to the schedule and overall system.
Morphine tolerance as a function of ratio schedule: response requirement or unit price?
Hughes, Christine E; Sigmon, Stacey C; Pitts, Raymond C; Dykstra, Linda A
2005-05-01
Key pecking by 3 pigeons was maintained by a multiple fixed-ratio 10, fixed-ratio 30, fixed-ratio 90 schedule of food presentation. Components differed with respect to amount of reinforcement, such that the unit price was 10 responses per 1-s access to food. Acute administration of morphine, l-methadone, and cocaine dose-dependently decreased overall response rates in each of the components. When a rate decreasing dose of morphine was administered daily, tolerance, as measured by an increase in the dose that reduced response rates to 50% of control (i.e., the ED50 value), developed in each of the components; however, the degree of tolerance was smallest in the fixed-ratio 90 component (i.e., the ED50 value increased the least). When the l-methadone dose-effect curve was redetermined during the chronic morphine phase, the degree of cross-tolerance conferred to l-methadone was similar across components, suggesting that behavioral variables may not influence the degree of cross-tolerance between opioids. During the chronic phase, the cocaine dose-effect curve shifted to the right for 2 pigeons and to the left for 1 pigeon, which is consistent with predictions based on the lack of pharmacological similarity between morphine and cocaine. When the morphine, l-methadone, and cocaine dose-effect curves were redetermined after chronic morphine administration ended, the morphine and l-methadone ED50s replicated those obtained prior to chronic morphine administration. The morphine data suggest that the fixed-ratio value (i.e., the absolute output) determines the degree of tolerance and not the unit price.
Zhou, Yi; Huang, Jinxi; Bai, Yu; Li, Changsheng
2017-01-01
Background Tumors may induce systemic immune dysfunction, which can be aggravated by surgery and anesthesia/analgesia. Data on the effect of flurbiprofen preemptive analgesia on immune dysfunction is limited. The aim of this study was to investigate the effect of flurbiprofen preemptive analgesia on lymphocytes and natural killer (NK) cells in patients undergoing thoracotomy and thoracoscopy radical esophagectomy, and to explore the analgesic methods suitable for tumor patients. Methods This was a randomized controlled pilot study of 89 patients with esophageal cancer treated with surgery at the Henan Cancer Hospital between January 1, 2015 and December 31, 2016. The patients were divided into three groups: group 1, thoracotomy; group 2, thoracoscopy and laparoscopic surgery; and group 3, flurbiprofen, thoracoscopy, and laparoscopic surgery. CD3+, CD19+, NK, CD4+, and CD8+ cells in whole blood were measured by flow cytometry 30 minutes before surgery (T0), at the end of the thoracic section of the procedure (T1), and at the end of the operation (T2). Results There were no significant differences in CD3+, CD19+, CD8+, NK, and CD4+ cells between the three groups or regarding the time points during the procedure (all P > 0.05). Thoracotomy and thoracoscopy surgery resulted in similar immunological outcomes. Conclusion Flurbiprofen ester preemptive analgesia did not suppress the immune function in patients and could be a safe analgesic method for patients with esophageal cancer undergoing surgery. PMID:28892265
Zhou, Yi; Huang, Jinxi; Bai, Yu; Li, Changsheng; Lu, Xihua
2017-11-01
Tumors may induce systemic immune dysfunction, which can be aggravated by surgery and anesthesia/analgesia. Data on the effect of flurbiprofen preemptive analgesia on immune dysfunction is limited. The aim of this study was to investigate the effect of flurbiprofen preemptive analgesia on lymphocytes and natural killer (NK) cells in patients undergoing thoracotomy and thoracoscopy radical esophagectomy, and to explore the analgesic methods suitable for tumor patients. This was a randomized controlled pilot study of 89 patients with esophageal cancer treated with surgery at the Henan Cancer Hospital between January 1, 2015 and December 31, 2016. The patients were divided into three groups: group 1, thoracotomy; group 2, thoracoscopy and laparoscopic surgery; and group 3, flurbiprofen, thoracoscopy, and laparoscopic surgery. CD3+, CD19+, NK, CD4+, and CD8+ cells in whole blood were measured by flow cytometry 30 minutes before surgery (T0), at the end of the thoracic section of the procedure (T1), and at the end of the operation (T2). There were no significant differences in CD3+, CD19+, CD8+, NK, and CD4+ cells between the three groups or regarding the time points during the procedure (all P > 0.05). Thoracotomy and thoracoscopy surgery resulted in similar immunological outcomes. Flurbiprofen ester preemptive analgesia did not suppress the immune function in patients and could be a safe analgesic method for patients with esophageal cancer undergoing surgery. © 2017 The Authors. Thoracic Cancer published by China Lung Oncology Group and John Wiley & Sons Australia, Ltd.
Whittington, Melanie D; Curtis, Donna J; Atherly, Adam J; Bradley, Cathy J; Lindrooth, Richard C; Campbell, Jonathan D
2017-07-01
To mitigate methicillin-resistant Staphylococcus aureus (MRSA) infections, intensive care units (ICUs) conduct surveillance through screening patients upon admission followed by adhering to isolation precautions. Two surveillance approaches commonly implemented are universal preemptive isolation and targeted isolation of only MRSA-positive patients. Decision analysis was used to calculate the total cost of universal preemptive isolation and targeted isolation. The screening test used as part of the surveillance practice was varied to identify which screening test minimized inappropriate and total costs. A probabilistic sensitivity analysis was conducted to evaluate the range of total costs resulting from variation in inputs. The total cost of the universal preemptive isolation surveillance practice was minimized when a polymerase chain reaction screening test was used ($82.51 per patient). Costs were $207.60 more per patient when a conventional culture was used due to the longer turnaround time and thus higher isolation costs. The total cost of the targeted isolation surveillance practice was minimized when chromogenic agar 24-hour testing was used ($8.54 per patient). Costs were $22.41 more per patient when polymerase chain reaction was used. For ICUs that preemptively isolate all patients, the use of a polymerase chain reaction screening test is recommended because it can minimize total costs by reducing inappropriate isolation costs. For ICUs that only isolate MRSA-positive patients, the use of chromogenic agar 24-hour testing is recommended to minimize total costs. Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.
Online stochastic optimization of radiotherapy patient scheduling.
Legrain, Antoine; Fortin, Marie-Andrée; Lahrichi, Nadia; Rousseau, Louis-Martin
2015-06-01
The effective management of a cancer treatment facility for radiation therapy depends mainly on optimizing the use of the linear accelerators. In this project, we schedule patients on these machines taking into account their priority for treatment, the maximum waiting time before the first treatment, and the treatment duration. We collaborate with the Centre Intégré de Cancérologie de Laval to determine the best scheduling policy. Furthermore, we integrate the uncertainty related to the arrival of patients at the center. We develop a hybrid method combining stochastic optimization and online optimization to better meet the needs of central planning. We use information on the future arrivals of patients to provide an accurate picture of the expected utilization of resources. Results based on real data show that our method outperforms the policies typically used in treatment centers.
Advanced Technology System Scheduling Governance Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ang, Jim; Carnes, Brian; Hoang, Thuc
In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. Themore » process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).« less
Velásquez, Grace Carolaine Esquivel; Santa Cruz, Luis A German; Espinoza, Mario Alberto Isiordia
2014-01-01
To evaluate the preemptive analgesia of ketoprofen in comparison with diclofenac after mandibular third molar surgery. This study was a double-blind, randomized clinical trial. Forty patients were randomized into two treatment groups (each with 20 patients) by using a series of random numbers: group A received ketoprofen 100 mg and group B received diclofenac 75 mg, all intramuscularly. Surgery was done 30 minutes after analgesic treatments. The durations of analgesia, pain intensity, analgesic consumption, and side effects were evaluated. The statistical analysis was done using the chi-square, Student t, Mann-Whitney U, and Log-Rank tests. The duration of analgesia was longer in the ketoprofen group when compared with the diclofenac group. The number of patients taking the first rescue analgesic at 6 hours was lower in the ketoprofen group in comparison with the diclofenac group. Patients who received ketoprofen had lower pain intensity compared with patients who received diclofenac. Intramuscular ketoprofen 100 mg is more effective than intramuscular diclofenac 75 mg after mandibular third molar extraction when used as a preemptive analgesic.
Cytomegalovirus infection in the bone marrow transplant patient.
Bhat, Vivek; Joshi, Amit; Sarode, Rahul; Chavan, Preeti
2015-12-24
Cytomegalovirus (CMV) infection is an important contributor to the morbidity and mortality associated with bone marrow transplantation (BMT). Infection may lead to CMV disease involving multiple organs such as pneumonia, gastroenteritis, retinitis, central nervus system involvement and others. CMV seropositivity is an important risk factor and approximately half of BMT recipients will develop clinically significant infection most commonly in the first 100 d post-transplant. The commonly used tests to diagnose CMV infection in these patients include the pp65 antigenemia test and the CMV DNA polymerase chain reaction (PCR) assay. Because of its greater sensitivity and lesser turnaround time, the CMV PCR is nowadays the preferred test and serves as a main guide for pre-emptive therapy. Methods of CMV prevention include use of blood products from seronegative donors or leukodepleted products. Prophylaxis or pre-emptive therapy strategies for CMV prevention may be used post-transplant with the latter becoming more common. The commonly used antivirals for pre-emptive therapy and CMV disease management include intravenous gancyclovir and foscarnet. The role of intravenous immunoglobulin, although used commonly in CMV pneumonia is not clear.
Morrissey, C Orla; Chen, Sharon C-A; Sorrell, Tania C; Bradstock, Kenneth F; Szer, Jeffrey; Halliday, Catriona L; Gilroy, Nicole M; Schwarer, Anthony P; Slavin, Monica A
2011-02-01
Invasive aspergillosis (IA) is a major cause of mortality in patients with hematological malignancies, due largely to the inability of traditional culture and biopsy methods to make an early or accurate diagnosis. Diagnostic accuracy studies suggest that Aspergillus galactomannan (GM) enzyme immunoassay (ELISA) and Aspergillus PCR-based methods may overcome these limitations, but their impact on patient outcomes should be evaluated in a diagnostic randomized controlled trial (D-RCT). This article describes the methodology of a D-RCT which compares a new pre-emptive strategy (GM-ELISA- and Aspergillus PCR-driven antifungal therapy) with the standard fever-driven empiric antifungal treatment strategy. Issues including primary end-point and patient selection, duration of screening, choice of tests for the pre-emptive strategy, antifungal prophylaxis and bias control, which were considered in the design of the trial, are discussed. We suggest that the template presented herein is considered by researchers when evaluating the utility of new diagnostic tests (ClinicalTrials.gov number, NCT00163722).
Effects of fixed labial orthodontic appliances on speech sound production.
Paley, Jonathan S; Cisneros, George J; Nicolay, Olivier F; LeBlanc, Etoile M
2016-05-01
To explore the impact of fixed labial orthodontic appliances on speech sound production. Speech evaluations were performed on 23 patients with fixed labial appliances. Evaluations were performed immediately prior to appliance insertion, immediately following insertion, and 1 and 2 months post insertion. Baseline dental/skeletal variables were correlated with the ability to accommodate the presence of the appliances. Appliance effects were variable: 44% of the subjects were unaffected, 39% were temporarily affected but adapted within 2 months, and 17% of patients showed persistent sound errors at 2 months. Resolution of acquired sound errors was noted by 8 months post-appliance removal. Maladaptation to appliances was correlated to severity of malocclusion as determined by the Grainger's Treatment Priority Index. Sibilant sounds, most notably /s/, were affected most often. (1) Insertion of fixed labial appliances has an effect on speech sound production. (2) Sibilant and stopped sounds are affected, with /s/ being affected most often. (3) Accommodation to fixed appliances depends on the severity of malocclusion.
Integrated optical 3D digital imaging based on DSP scheme
NASA Astrophysics Data System (ADS)
Wang, Xiaodong; Peng, Xiang; Gao, Bruce Z.
2008-03-01
We present a scheme of integrated optical 3-D digital imaging (IO3DI) based on digital signal processor (DSP), which can acquire range images independently without PC support. This scheme is based on a parallel hardware structure with aid of DSP and field programmable gate array (FPGA) to realize 3-D imaging. In this integrated scheme of 3-D imaging, the phase measurement profilometry is adopted. To realize the pipeline processing of the fringe projection, image acquisition and fringe pattern analysis, we present a multi-threads application program that is developed under the environment of DSP/BIOS RTOS (real-time operating system). Since RTOS provides a preemptive kernel and powerful configuration tool, with which we are able to achieve a real-time scheduling and synchronization. To accelerate automatic fringe analysis and phase unwrapping, we make use of the technique of software optimization. The proposed scheme can reach a performance of 39.5 f/s (frames per second), so it may well fit into real-time fringe-pattern analysis and can implement fast 3-D imaging. Experiment results are also presented to show the validity of proposed scheme.
The LINC-NIRVANA fringe and flexure tracker: Linux real-time solutions
NASA Astrophysics Data System (ADS)
Wang, Yeping; Bertram, Thomas; Straubmeier, Christian; Rost, Steffen; Eckart, Andreas
2006-06-01
The correction of atmospheric differential piston and instrumental flexure effects is mandatory for optimum interferometric performance of the LBT NIR interferometric imaging camera LINC-NIRVANA. The task of the Fringe and Flexure Tracking System (FFTS) is to detect and correct these effects in a real-time closed loop. On a timescale of milliseconds, image data of the order of 4K bytes has to be retrieved from the FFTS detector, analyzed, and the results have to be sent to the control system. The need for a reliable communication between several processes within a confined period of time calls for solutions with good real-time performance. We investigated two soft real-time options for the Linux platform. The design we present takes advantage of several features that follow the POSIX standard with improved real-time performance, which were implemented in the new Linux kernel (2.6.12). Several concepts, such as synchronization, shared memory, and preemptive scheduling are considered and the performance of the most time-critical parts of the FFTS software is tested.
An efficient, modular and simple tape archiving solution for LHC Run-3
NASA Astrophysics Data System (ADS)
Murray, S.; Bahyl, V.; Cancio, G.; Cano, E.; Kotlyar, V.; Kruse, D. F.; Leduc, J.
2017-10-01
The IT Storage group at CERN develops the software responsible for archiving to tape the custodial copy of the physics data generated by the LHC experiments. Physics run 3 will start in 2021 and will introduce two major challenges for which the tape archive software must be evolved. Firstly the software will need to make more efficient use of tape drives in order to sustain the predicted data rate of 150 petabytes per year as opposed to the current 50 petabytes per year. Secondly the software will need to be seamlessly integrated with EOS, which has become the de facto disk storage system provided by the IT Storage group for physics data. The tape storage software for LHC physics run 3 is code named CTA (the CERN Tape Archive). This paper describes how CTA will introduce a pre-emptive drive scheduler to use tape drives more efficiently, will encapsulate all tape software into a single module that will sit behind one or more EOS systems, and will be simpler by dropping support for obsolete backwards compatibility.
A real-time programming system.
Townsend, H R
1979-03-01
The paper describes a Basic Operating and Scheduling System (BOSS) designed for a small computer. User programs are organised as self-contained modular 'processes' and the way in which the scheduler divides the time of the computer equally between them, while arranging for any process which has to respond to an interrupt from a peripheral device to be given the necessary priority, is described in detail. Next the procedures provided by the operating system to organise communication between processes are described, and how they are used to construct dynamically self-modifying real-time systems. Finally, the general philosophy of BOSS and applications to a multi-processor assembly are discussed.
Fixed Base Modal Survey of the MPCV Orion European Service Module Structural Test Article
NASA Technical Reports Server (NTRS)
Winkel, James P.; Akers, J. C.; Suarez, Vicente J.; Staab, Lucas D.; Napolitano, Kevin L.
2017-01-01
Recently, the MPCV Orion European Service Module Structural Test Article (E-STA) underwent sine vibration testing using the multi-axis shaker system at NASA GRC Plum Brook Station Mechanical Vibration Facility (MVF). An innovative approach using measured constraint shapes at the interface of E-STA to the MVF allowed high-quality fixed base modal parameters of the E-STA to be extracted, which have been used to update the E-STA finite element model (FEM), without the need for a traditional fixed base modal survey. This innovative approach provided considerable program cost and test schedule savings. This paper documents this modal survey, which includes the modal pretest analysis sensor selection, the fixed base methodology using measured constraint shapes as virtual references and measured frequency response functions, and post-survey comparison between measured and analysis fixed base modal parameters.
76 FR 62377 - Pacific Fishery Management Council; Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-07
...) making it permissible to stack both a limited entry trawl and fixed gear permit on a single vessel at the... increased efficiency and selectivity. As a secondary priority, the TRREC may focus on other regulations made.... Special Accommodations This meeting is accessible to people with disabilities. Requests for sign language...