Sample records for flats closure unit

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-09-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less

  2. Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada, Revision 1 ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 98, Frenchman Flat, Nevada National Security Site (NNSS), Nevada. The Frenchman Flat CAU was the site of 10 underground nuclear tests, some of which have impacted groundwater near the tests. This work was performed as part of the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity in accordance with the Federal Facility Agreement and Consent Order (FFACO). This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from the impactedmore » groundwater« less

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-01-01

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 569: Area 3 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloop, Christy

    2013-04-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 569: Area 3 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 569 comprises the following nine corrective action sites (CASs): • 03-23-09, T-3 Contamination Area • 03-23-10, T-3A Contamination Area • 03-23-11, T-3B Contamination Area • 03-23-12, T-3S Contamination Area • 03-23-13, T-3T Contamination Area • 03-23-14, T-3V Contamination Area • 03-23-15, S-3G Contamination Area • 03-23-16, S-3H Contamination Area • 03-23-21, Pike Contamination Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supportingmore » the recommendation that no further corrective action is needed for CAU 569 based on the implementation of the corrective actions listed in Table ES-2.« less

  6. Post-Closure Land Jurisdiction Transfer to the US Fish and Wildlife Service at Rocky Flats: Surviving the Safari Through Old Records and Other Lessons Learned

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schiesswohl, S.; Hanson, M.

    The U.S. Department of Energy's (DOE's) Rocky Flats Site (Rocky Flats), located near Denver, Colorado, was listed on the Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List (NPL) in 1989. Subsequent cleanup and closure activities were completed in October 2005 and the final remedy was selected in September 2006. The remedy is 'no further action' for the generally un-impacted Peripheral Operable Unit (OU), formerly known as the Buffer Zone, and institutional and physical controls with continued monitoring for the Central OU, formerly the industrialized area. The Peripheral OU has been deleted from the NPL and jurisdiction over themore » majority of land in that OU (3,953 acres) was transferred to the U.S. Fish and Wildlife Service (USFWS) on July 12, 2007, to establish the Rocky Flats National Wildlife Refuge. The remaining approximately 929 acres in the Peripheral OU were retained by DOE's Office of Legacy Management where outstanding mineral leases and mining operations exist. As mineral rights are purchased or mining operations and mineral leases are completed and fully reclaimed, jurisdiction of portions of the 929 acres will also be transferred to USFWS for inclusion into the refuge. During the almost 2 years since cleanup and closure work was completed at Rocky Flats, DOE and USFWS have worked the specific legal parameters, timing, and constraints of the 3,953-acre transfer. Many lessons have been learned, based on these early experiences. (authors)« less

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 571: Area 9 Yucca Flat Plutonium Dispersion Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-08-01

    The purpose of this CADD/CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 571 based on the implementation of corrective actions. This includes a description of investigation activities, an evaluation of the data, and a description of corrective actions that were performed. The CAIP provides information relating to the scope and planning of the investigation. Therefore, that information will not be repeated in this document.

  8. Closing Rocky Flats by 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuor, N. R.; Schubert, A. L.

    2002-02-26

    Safely accelerating the closure of Rocky Flats to 2006 is a goal shared by many: the State of Colorado, the communities surrounding the site, the U.S. Congress, the Department of Energy, Kaiser-Hill and its team of subcontractors, the site's employees, and taxpayers across the country. On June 30, 2000, Kaiser-Hill (KH) submitted to the Department of Energy (DOE), KH's plan to achieve closure of Rocky Flats by December 15, 2006, for a remaining cost of $3.96 billion (February 1, 2000, to December 15, 2006). The Closure Project Baseline (CPB) is the detailed project plan for accomplishing this ambitious closure goal.more » This paper will provide a status report on the progress being made toward the closure goal. This paper will: provide a summary of the closure contract completion criteria; give the current cost and schedule variance of the project and the status of key activities; detail important accomplishments of the past year; and discuss the challenges ahead.« less

  9. Closure Report for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-06-27

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 104, Area 7 Yucca Flat Atmospheric Test Sites, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 104 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management. CAU 104 consists of the following 15 Corrective Action Sites (CASs), located in Area 7 of the Nevada National Securitymore » Site: · CAS 07-23-03, Atmospheric Test Site T-7C · CAS 07-23-04, Atmospheric Test Site T7-1 · CAS 07-23-05, Atmospheric Test Site · CAS 07-23-06, Atmospheric Test Site T7-5a · CAS 07-23-07, Atmospheric Test Site - Dog (T-S) · CAS 07-23-08, Atmospheric Test Site - Baker (T-S) · CAS 07-23-09, Atmospheric Test Site - Charlie (T-S) · CAS 07-23-10, Atmospheric Test Site - Dixie · CAS 07-23-11, Atmospheric Test Site - Dixie · CAS 07-23-12, Atmospheric Test Site - Charlie (Bus) · CAS 07-23-13, Atmospheric Test Site - Baker (Buster) · CAS 07-23-14, Atmospheric Test Site - Ruth · CAS 07-23-15, Atmospheric Test Site T7-4 · CAS 07-23-16, Atmospheric Test Site B7-b · CAS 07-23-17, Atmospheric Test Site - Climax Closure activities began in October 2012 and were completed in April 2013. Activities were conducted according to the Corrective Action Decision Document/Corrective Action Plan for CAU 104. The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste, mixed waste, and recyclable material. Some wastes exceeded land disposal limits and required treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite landfills. The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NFO for closure of CAU 104 · The transfer of CAU 104 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  10. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    This corrective action decision document (CADD)/corrective action plan (CAP) has been prepared for Corrective Action Unit (CAU) 97, Yucca Flat/Climax Mine, Nevada National Security Site (NNSS), Nevada. The Yucca Flat/Climax Mine CAU is located in the northeastern portion of the NNSS and comprises 720 corrective action sites. A total of 747 underground nuclear detonations took place within this CAU between 1957 and 1992 and resulted in the release of radionuclides (RNs) in the subsurface in the vicinity of the test cavities. The CADD portion describes the Yucca Flat/Climax Mine CAU data-collection and modeling activities completed during the corrective action investigationmore » (CAI) stage, presents the corrective action objectives, and describes the actions recommended to meet the objectives. The CAP portion describes the corrective action implementation plan. The CAP presents CAU regulatory boundary objectives and initial use-restriction boundaries identified and negotiated by DOE and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the groundwater flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The UGTA strategy assumes that active remediation of subsurface RN contamination is not feasible with current technology. As a result, the corrective action is based on a combination of characterization and modeling studies, monitoring, and institutional controls. The strategy is implemented through a four-stage approach that comprises the following: (1) corrective action investigation plan (CAIP), (2) CAI, (3) CADD/CAP, and (4) closure report (CR) stages.« less

  11. Clarification of Institutional Controls at the Rocky Flats Site Central Operable Unit and Implementation of the Soil Disturbance Review Plan - 13053

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiSalvo, Rick; Surovchak, Scott; Spreng, Carl

    2013-07-01

    Cleanup and closure of DOE's Rocky Flats Site in Colorado, which was placed on the CERCLA National Priority List in 1989, was accomplished under CERCLA, RCRA, and the Colorado Hazardous Waste Act (CHWA). The physical cleanup work was completed in late 2005 and all buildings and other structures that composed the Rocky Flats industrial complex were removed from the surface, but remnants remain in the subsurface. Other remaining features include two landfills closed in place with covers, four groundwater treatment systems, and surface water and groundwater monitoring systems. Under the 2006 Corrective Action Decision/Record of Decision for Rocky Flats Plantmore » (US DOE) Peripheral Operable Unit and the Central Operable Unit (CAD/ROD), the response actions selected for the Central Operable Unit (OU) are institutional controls (ICs), physical controls, and continued monitoring and maintenance. The objectives of these ICs were to prevent unacceptable exposure to remaining subsurface contamination and to prevent contaminants from mobilizing to surface water and to prevent interfering with the proper functioning of the engineered components of the remedy. An amendment in 2011 of the 2006 CAD/ROD clarified the ICs to prevent misinterpretation that would prohibit work to manage and maintain the Central OU property. The 2011 amendment incorporated a protocol for a Soil Disturbance Review Plan for work subject to ICs that requires approval from the State and public notification by DOE prior to conducting approved soil-disturbing work. (authors)« less

  12. Corrective Action Investigation Plan for Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada with ROTCs 1, 2, and 3 (Revision 0, September 2000)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrews, Robert; Marutzky, Sam

    2000-09-01

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) approach to collect the data necessary to evaluate Corrective Action Alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 97 under the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 97, collectively known as the Yucca Flat/Climax Mine CAU, consists of 720 Corrective Action Sites (CASs). The Yucca Flat/Climax Mine CAU extends over several areas of the NTS and constitutes one of several areas used for underground nuclear testing in the past. The nuclear tests resulted in groundwater contamination in themore » vicinity as well as downgradient of the underground test areas. Based on site history, the Yucca Flat underground nuclear tests were conducted in alluvial, volcanic, and carbonate rocks; whereas, the Climax Mine tests were conducted in an igneous intrusion located in northern Yucca Flat. Particle-tracking simulations performed during the regional evaluation indicate that the local Climax Mine groundwater flow system merges into the much larger Yucca Flat groundwater flow systems during the 1,000-year time period of interest. Addressing these two areas jointly and simultaneously investigating them as a combined CAU has been determined the best way to proceed with corrective action investigation (CAI) activities. The purpose and scope of the CAI includes characterization activities and model development conducted in five major sequential steps designed to be consistent with FFACO Underground Test Area Project's strategy to predict the location of the contaminant boundary, develop and implement a corrective action, and close each CAU. The results of this field investigation will support a defensible evaluation of CAAs in the subsequent corrective action decision document.« less

  13. Post-Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada for Calendar Year 2016 (January 2016–December 2016), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are evaluatedmore » to determine whether the UR boundaries remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Additionally, monitoring data are used to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries (CBs) calculated with the models are the primary basis of the UR boundaries. In summary, the monitoring results from 2016 indicate the regulatory controls on the closure of CAU 98 remain effective in protection of human health and the environment. Recommendations resulting from this first year of monitoring activities include formally incorporating wells UE-5 PW-1, UE-5 PW-2, and UE-5 PW-3 into the groundwater-level monitoring network given their strategic location in the basin; and early development of a basis for trigger levels for the groundwater-level monitoring given the observed trends. Additionally, it is recommended to improve the Real Estate/Operations Permit process for capturing information important for evaluating the impact of activities on groundwater resources, and to shift the reporting requirement for this annual report from the second quarter of the federal fiscal year (end of March) to the second quarter of the calendar year (end of June).« less

  14. CY2017 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada: (January 2017–December 2017), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rehfeldt, Ken; Haight, Brian

    Corrective Action Unit (CAU) 98: Frenchman Flat on the Nevada National Security Site was the location of 10 underground nuclear tests. CAU 98 underwent a series of investigations and actions in accordance with the Federal Facility Agreement and Consent Order to assess contamination of groundwater by radionuclides from the tests. A Closure Report completed that process in 2016 and called for long-term monitoring, use restrictions (URs), and institutional controls to protect the public and environment from potential exposure to contaminated groundwater. Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitoredmore » to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2017. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. The 86,000-picocuries-per-liter (pCi/L) tritium concentration in one of the wells is about 12 percent higher than measured in 2016 but is over an order of magnitude less than the peak value measured in the well in 1980. The concentration in the other source/plume well is lower than measured in 2016. The water-level monitoring network includes 16 wells. Depth to water measured in 2017 is generally consistent with recent measurements for most wells. Water-level declines differing from long-term trends were observed in four wells. Three of these (WW-4, WW-4A, and WW-5B) are water-supply wells that experienced increases in pumping during the year. No definitive cause for the sharp decline in the fourth well (ER-5-3-2) in 2016 is known as yet. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.« less

  15. An analysis of fracture trace patterns in areas of flat-lying sedimentary rocks for the detection of buried geologic structure. [Kansas and Texas

    NASA Technical Reports Server (NTRS)

    Podwysocki, M. H.

    1974-01-01

    Two study areas in a cratonic platform underlain by flat-lying sedimentary rocks were analyzed to determine if a quantitative relationship exists between fracture trace patterns and their frequency distributions and subsurface structural closures which might contain petroleum. Fracture trace lengths and frequency (number of fracture traces per unit area) were analyzed by trend surface analysis and length frequency distributions also were compared to a standard Gaussian distribution. Composite rose diagrams of fracture traces were analyzed using a multivariate analysis method which grouped or clustered the rose diagrams and their respective areas on the basis of the behavior of the rays of the rose diagram. Analysis indicates that the lengths of fracture traces are log-normally distributed according to the mapping technique used. Fracture trace frequency appeared higher on the flanks of active structures and lower around passive reef structures. Fracture trace log-mean lengths were shorter over several types of structures, perhaps due to increased fracturing and subsequent erosion. Analysis of rose diagrams using a multivariate technique indicated lithology as the primary control for the lower grouping levels. Groupings at higher levels indicated that areas overlying active structures may be isolated from their neighbors by this technique while passive structures showed no differences which could be isolated.

  16. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... post-closure care. (a) At closure of a magazine or unit which stored hazardous waste under this subpart... estimates for closure, and financial responsibility for magazines or units must meet all of the requirements... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  17. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  18. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  19. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  20. 10 CFR 960.5-2-8 - Surface characteristics.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... NUCLEAR WASTE REPOSITORY Preclosure Guidelines Ease and Cost of Siting, Construction, Operation, and... repository siting, construction, operation, and closure. (b) Favorable conditions. (1) Generally flat terrain...

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jody K.

    Land stewardship is one of nine sustainability programs in the U.S. Department of Energy's Environmental Management System. Land stewardship includes maintaining and improving ecosystem health. At the Rocky Flats Site near Westminster, Colorado, land stewardship is an integral component of the Office of Legacy Management's post-closure monitoring and management at the site. Nearly 263 hectares (650 acres) were disturbed and re-vegetated during site cleanup and closure operations. Proactive management of revegetation areas is critical to the successful reestablishment of native grasslands, wetlands, and riparian communities. The undisturbed native plant communities that occur at the site also require active management tomore » maintain the high-quality wetlands and other habitats that are home to numerous species of birds and other wildlife such as elk and deer, rare plant communities, and the federally listed threatened Preble's meadow jumping mouse. Over the past several decades, an increase of Noxious weeds has impacted much of Colorado's Front Range. As a result, weed control is a key component of the land stewardship program at Rocky Flats. Thirty-three species of state-listed Noxious weeds are known to occur in the Central and Peripheral Operable Units at Rocky Flats, along with another five species that are considered invasive at the site. Early detection and rapid response to control new invasive species is crucial to the program. An integrated weed control/vegetation management approach is key to maintaining healthy, sustainable plant communities that are able to resist Noxious weed invasions. Weed mapping, field surveys, and field-staff training sessions (to learn how to identify new potential problem species) are conducted to help detect and prevent new weed problems. The integrated approach at Rocky Flats includes administrative and cultural techniques (prevention), mechanical controls, biological controls, and chemical controls. Several species of biocontrol insects have been released to assist with control of different target weed species. Monitoring is conducted to evaluate the effectiveness of control efforts and to provide information for future control efforts. The effective implementation of this integrated approach has reduced the infestation levels of many species and has kept several newly discovered invasive species from spreading and becoming larger problems at the site. (authors)« less

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 106: Area 5, 11 Frenchman Flat Atmospheric Sites, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews and Dawn Peterson

    2011-09-01

    Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less

  3. Closure of hazardous and mixed radioactive waste management units at DOE facilities. [Contains glossary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is document addresses the Federal regulations governing the closure of hazardous and mixed waste units subject to Resource Conservation and Recovery Act (RCRA) requirements. It provides a brief overview of the RCRA permitting program and the extensive RCRA facility design and operating standards. It provides detailed guidance on the procedural requirements for closure and post-closure care of hazardous and mixed waste management units, including guidance on the preparation of closure and post-closure plans that must be submitted with facility permit applications. This document also provides guidance on technical activities that must be conducted both during and after closure ofmore » each of the following hazardous waste management units regulated under RCRA.« less

  4. Interim Status Closure Plan Open Burning Treatment Unit Technical Area 16-399 Burn Tray

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.

    2012-05-07

    This closure plan describes the activities necessary to close one of the interim status hazardous waste open burning treatment units at Technical Area (TA) 16 at the Los Alamos National Laboratory (LANL or the Facility), hereinafter referred to as the 'TA-16-399 Burn Tray' or 'the unit'. The information provided in this closure plan addresses the closure requirements specified in the Code of Federal Regulations (CFR), Title 40, Part 265, Subparts G and P for the thermal treatment units operated at the Facility under the Resource Conservation and Recovery Act (RCRA) and the New Mexico Hazardous Waste Act. Closure of themore » open burning treatment unit will be completed in accordance with Section 4.1 of this closure plan.« less

  5. 40 CFR 265.117 - Post-closure care and use of property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 265.117 Section 265.117 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID.... (a)(1) Post-closure care for each hazardous waste management unit subject to the requirements of... this part. (2) Any time preceding closure of a hazardous waste management unit subject to post-closure...

  6. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... closure of a magazine or unit which stored hazardous waste under this subpart, the owner or operator must..., and financial responsibility for magazines or units must meet all of the requirements specified in... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  7. 40 CFR 258.16 - Closure of existing municipal solid waste landfill units.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Location Restrictions § 258.16 Closure of existing municipal solid waste landfill units. (a) Existing MSWLF units that cannot make the... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Closure of existing municipal solid...

  8. 40 CFR 258.16 - Closure of existing municipal solid waste landfill units.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Location Restrictions § 258.16 Closure of existing municipal solid waste landfill units. (a) Existing MSWLF units that cannot make the... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Closure of existing municipal solid...

  9. Automated method for determining Instron Residual Seal Force of glass vial/rubber closure systems.

    PubMed

    Ludwig, J D; Nolan, P D; Davis, C W

    1993-01-01

    Instron Residual Seal Force (IRSF) of glass vial/rubber closure systems was determined using an Instron 4501 Materials Testing System. Computer programs were written to process raw data and calculate IRSF values. Preliminary experiments indicated both the appearance of the stress-deformation curves and precision of the derived IRSF values were dependent on the internal dimensions and top surface geometry of the cap anvil. Therefore, a series of five cap anvils varying in shape and dimensions were machined to optimize performance and precision. Vials capped with West 4416/50 PURCOAT button closures or Helvoet compound 6207 lyophilization closures were tested with each cap anvil. Cap anvils with spherical top surfaces and narrow internal dimensions produced more precise results and more uniform stress-deformation curves than cap anvils with flat top surfaces and wider internal dimensions.

  10. 100-D Ponds closure plan. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersen, S.W.

    1997-09-01

    The 100-D Ponds is a Treatment, Storage, and Disposal (TSD) unit on the Hanford Facility that received both dangerous and nonregulated waste. This Closure Plan (Rev. 1) for the 100-D Ponds TSD unit consists of a RCRA Part A Dangerous Waste Permit Application (Rev. 3), a RCRA Closure Plan, and supporting information contained in the appendices to the plan. The closure plan consists of eight chapters containing facility description, process information, waste characteristics, and groundwater monitoring data. There are also chapters containing the closure strategy and performance standards. The strategy for the closure of the 100-D Ponds TSD unit ismore » clean closure. Appendices A and B of the closure plan demonstrate that soil and groundwater beneath 100-D Ponds are below cleanup limits. All dangerous wastes or dangerous waste constituents or residues associated with the operation of the ponds have been removed, therefore, human health and the environment are protected. Discharges to the 100-D Ponds, which are located in the 100-DR-1 operable unit, were discontinued in June 1994. Contaminated sediment was removed from the ponds in August 1996. Subsequent sampling and analysis demonstrated that there is no contamination remaining in the ponds, therefore, this closure plan is a demonstration of clean closure.« less

  11. Second-order closure models for supersonic turbulent flows

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.; Sarkar, Sutanu

    1991-01-01

    Recent work by the authors on the development of a second-order closure model for high-speed compressible flows is reviewed. This turbulence closure is based on the solution of modeled transport equations for the Favre-averaged Reynolds stress tensor and the solenoidal part of the turbulent dissipation rate. A new model for the compressible dissipation is used along with traditional gradient transport models for the Reynolds heat flux and mass flux terms. Consistent with simple asymptotic analyses, the deviatoric part of the remaining higher-order correlations in the Reynolds stress transport equation are modeled by a variable density extension of the newest incompressible models. The resulting second-order closure model is tested in a variety of compressible turbulent flows which include the decay of isotropic turbulence, homogeneous shear flow, the supersonic mixing layer, and the supersonic flat-plate turbulent boundary layer. Comparisons between the model predictions and the results of physical and numerical experiments are quite encouraging.

  12. Second-order closure models for supersonic turbulent flows

    NASA Technical Reports Server (NTRS)

    Speziale, Charles G.; Sarkar, Sutanu

    1991-01-01

    Recent work on the development of a second-order closure model for high-speed compressible flows is reviewed. This turbulent closure is based on the solution of modeled transport equations for the Favre-averaged Reynolds stress tensor and the solenoidal part of the turbulent dissipation rate. A new model for the compressible dissipation is used along with traditional gradient transport models for the Reynolds heat flux and mass flux terms. Consistent with simple asymptotic analyses, the deviatoric part of the remaining higher-order correlations in the Reynolds stress transport equations are modeled by a variable density extension of the newest incompressible models. The resulting second-order closure model is tested in a variety of compressible turbulent flows which include the decay of isotropic turbulence, homogeneous shear flow, the supersonic mixing layer, and the supersonic flat-plate turbulent boundary layer. Comparisons between the model predictions and the results of physical and numerical experiments are quite encouraging.

  13. Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chapman, Jenny; Lyles, Brad; Cooper, Clay

    Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less

  14. CRP - VD Tube & Closure -  Unit Non-Reclosable Packaging Rigid

    EPA Pesticide Factsheets

    This is a unit-dose non-reclosable rigid package. The package consists of a tube and a closure that is permanently attached to the tube neck. The package is opened by pushing down on the closure and simultaneously turning it counterclockwise.

  15. Resource Conservation and Recovery Act closure report: Area 2 Bitcutter and Postshot Containment Shops Injection Wells, Correction Action Unit 90

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less

  16. 40 CFR 264.117 - Post-closure care and use of property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 264.117 Section 264.117 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... for each hazardous waste management unit subject to the requirements of §§ 264.117 through 264.120... preceding partial closure of a hazardous waste management unit subject to post-closure care requirements or...

  17. 300 Area waste acid treatment system closure plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to themore » General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.« less

  18. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  19. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  20. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  1. 40 CFR 264.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FACILITIES Hazardous Waste Munitions and Explosives Storage § 264.1202 Closure and post-closure care. (a) At... it remains in service as a munitions or explosives magazine or storage unit. (b) If, after removing...

  2. Closure report for Corrective Action Unit 211, Area 15 EPA Farm waste sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-04-01

    This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.

  3. A comparison of two endoscopic closures: over-the-scope clip (OTSC) versus KING closure (endoloop + clips) in a randomized long-term experimental study.

    PubMed

    Dolezel, R; Ryska, O; Kollar, M; Juhasova, J; Kalvach, J; Ryska, M; Martinek, J

    2016-11-01

    Both over-the-scope clip (OTSC) and KING (endoloop + clips) closures provide reliable and safe full-thickness endoscopic closure. Nevertheless, OTSC clip demonstrated significantly inferior histological healing in the short-term follow-up. To compare OTSC versus KING closure of a perforation with regard to long-term effectiveness and macroscopic and histological quality of healing. We performed a randomized experimental study with 16 mini-pigs (mean weight 43.2 ± 11.2 kg). A standardized perforation was performed on the anterior sigmoid wall. KING closure (n = 8) was attained by approximation of an endoloop fixed to the margins of a perforation with endoclips. OTSC closure (n = 8) was performed by deploying OTSC (OVESCO) over the defect. Pigs underwent a control sigmoidoscopy 8 months after the closure to assess the macroscopic quality of healing. Then, autopsy was performed and the rectosigmoid was sent for histopathological assessment. All closures were completed successfully without air leaks. The duration of closure was similar in both techniques (OTSC 17.8 ± 7.6 min vs. KING 19.6 ± 8.8 min). At autopsy, all KING closures (100 %) were healed with a flat scar without signs of leakage. Microscopically, no inflammatory changes were observed after KING closure. In the OTSC group, microscopic ulcers were present in two pigs (25 %), cryptal abscesses in three pigs (38 %) and significant neutrophil accumulation in all eight pigs (P < 0.01). Giant cell granulomas, dysplasia or abundant scarification was not observed in either group. Both OTSC and KING closures offer a long-term reliable seal of a gastrointestinal perforation without stenosis or fistulas. KING closure provides long-term histologically superior healing.

  4. Self-testing security sensor for monitoring closure of vault doors and the like

    DOEpatents

    Cawthorne, Duane C.

    1997-05-27

    A self-testing device is provided for a monitoring system for monitoring whether a closure member such as a door or window is closed. The monitoring system includes a switch unit mounted on the frame of the closure member being monitored and including magnetically biased switches connected in one or more electrical monitoring circuits, and a door magnet unit mounted on the closure member being monitored. The door magnet includes one or more permanent magnets that produce a magnetic field which, when the closure member is closed, cause said switches to assume a first state. When the closure member is opened, the switches switch to a second, alarm state. The self-testing device is electrically controllable from a remote location and produces a canceling or diverting magnetic field which simulates the effect of movement of the closure member from the closed position thereof without any actual movement of the member.

  5. Self-testing security sensor for monitoring closure of vault doors and the like

    DOEpatents

    Cawthorne, D.C.

    1997-05-27

    A self-testing device is provided for a monitoring system for monitoring whether a closure member such as a door or window is closed. The monitoring system includes a switch unit mounted on the frame of the closure member being monitored and including magnetically biased switches connected in one or more electrical monitoring circuits, and a door magnet unit mounted on the closure member being monitored. The door magnet includes one or more permanent magnets that produce a magnetic field which, when the closure member is closed, cause said switches to assume a first state. When the closure member is opened, the switches switch to a second, alarm state. The self-testing device is electrically controllable from a remote location and produces a canceling or diverting magnetic field which simulates the effect of movement of the closure member from the closed position thereof without any actual movement of the member. 5 figs.

  6. Fuzzy topological digital space and their properties of flat electroencephalography in epilepsy disease

    NASA Astrophysics Data System (ADS)

    Muzafar Shah, Mazlina; Fatah Wahab, Abdul

    2017-09-01

    There are an abnormal electric activities or irregular interference in brain of epilepsy patient. Then a sensor will be put in patient’s scalp to measure and records all electric activities in brain. The result of the records known as Electroencephalography (EEG). The EEG has been transfer to flat EEG because it’s easier to analyze. In this study, the uncertainty in flat EEG data will be considered as fuzzy digital space. The purpose of this research is to show that the flat EEG is fuzzy topological digital space. Therefore, the main focus for this research is to introduce fuzzy topological digital space concepts with their properties such as neighbourhood, interior and closure by using fuzzy set digital concept and Chang’s fuzzy topology approach. The product fuzzy topology digital also will be shown. By introduce this concept, the data in flat EEG can considering having fuzzy topology digital properties and can identify the area in fuzzy digital space that has been affected by epilepsy seizure in epileptic patient’s brain.

  7. Nearshore distribution and abundance of Dungeness crabs in Glacier Bay National Park, Alaska

    USGS Publications Warehouse

    O'Clair, Charles E.; Freese, J. Lincoln; Stone, Robert P.; Shirley, Thomas C.; Leder, Erica H.; Taggart, S. James; Kruse, Gordon H.; Engstrom, Daniel R.

    1995-01-01

    As part of an ongoing, multi-agency study to determine the effects of closure of the commercial fishery for Dungeness crabs, Cancer magister, on crab population structure we examined patterns of distribution and abundance of crabs in nearshore habitats at five locations in and near Glacier Bay National Park. Sampling was conducted in April and September 1992 and April 1993 prior to the anticipated closure of the fishery in the park. Divers censused crabs by sex and reproductive state (ovigerous/nonovigerous females) along belt transects (2m x 100m) laid perpendicular to shore in the depth range 0 m (mean lower low water) to 18 m.Preliminary results from the first three sampling periods revealed that the average densities of Dungeness crabs at the five locations ranged from 78 to 2012 crabs/ha. Crab densities differed between populations depending on sex, reproductive state of females and sampling period. Male crabs showed reduced densities at Gustavus Flats in April 1992 (P<0.01) and 1993 (P<0.001). Ovigerous females had greater density at Bartlett Cove in April 1993 (P<0.001). Sex ratios were frequently skewed toward females. At Bartlett Cove and Gustavus Flats females outnumbered males in April 1992 and 1993 (P<0.001). Most of the females at Bartlett Cove and Gustavus Flats in April 1992 and 1993 were ovigerous (P-0.001). Males tended to occupy greater depths than females in April 1992 (P<0.05) but not April 1993 (P-005). The mean depth of males shifted from deeper to shallower water between April and September 1992 (P<0.001). The depth distribution of ovigerous crabs did not differ from that of nonovigerous female crabs. Future research prior to the anticipated closure of the commercial Dungeness crab fishery in Glacier Bay will include a tagging study to determine the extent of crab movement and further study of the temporal as well as the spatial variability observed in the structure of these populations.

  8. Stratigraphic and volcano-tectonic relations of Crater Flat Tuff and some older volcanic units, Nye County, Nevada

    USGS Publications Warehouse

    Carr, W.J.; Byers, F.M.; Orkild, Paul P.

    1984-01-01

    The Crater Flat Tuff is herein revised to include a newly recognized lowest unit, the Tram Member, exposed at scattered localities in the southwest Nevada Test Site region, and in several drill holes in the Yucca Mountain area. The overlying Bullfrog and Prow Pass Members are well exposed at the type locality of the formation near the southeast edge of Crater Flat, just north of U.S. Highway 95. In previous work, the Tram Member was thought to be the Bullfrog Member, and therefore was shown as Bullfrog or as undifferentiated Crater Flat Tuff on published maps. The revised Crater Flat Tuff is stratigraphically below the Topopah Spring Member of the Paintbrush Tuff and above the Grouse Canyon Member of the Belted Range Tuff, and is approximately 13.6 m.y. old. Drill holes on Yucca Mountain and near Fortymile Wash penetrate all three members of the Crater Flat as well as an underlying quartz-poor unit, which is herein defined as the Lithic Ridge Tuff from exposures on Lithic Ridge near the head of Topopah Wash. In outcrops between Calico Hills and Yucca Flat, the Lithic Ridge Tuff overlies a Bullfrog-like unit of reverse magnetic polarity that probably correlates with a widespread unit around and under Yucca Flat, referred to previously as Crater Flat Tuff. This unit is here informally designated as the tuff of Yucca Flat. Although older, it may be genetically related to the Crater Flat Tuff. Although the rocks are poorly exposed, geophysical and geologic evidence to date suggests that (1) the source of the Crater Flat Tuff is a caldera complex in the Crater Flat area between Yucca Mountain and Bare Mountain, and (2) there are at least two cauldrons within this complex--one probably associated with eruption of the Tram, the other with the Bullfrog and Prow Pass Members. The complex is named the Crater Flat-Prospector Pass caldera complex. The northern part of the Yucca Mountain area is suggested as the general location of the source of pre-Crater Flat tuffs, but a caldera related to the Lithic Ridge Tuff has not been specifically identified.

  9. Eocene lake basins in Wyoming and Nevada record rollback of the Farallon flat-slab beneath western North America

    NASA Astrophysics Data System (ADS)

    Smith, M. E.; Cassel, E. J.; Jicha, B. R.; Singer, B. S.; Carroll, A.

    2014-12-01

    Numerical and conceptual models of flat-slab rollback predict broad initial dynamic subsidence above the slab hinge then uplift and volcanism triggered by the advection of asthenosphere beneath the overriding plate. These predicted surface effects provide a viable but largely untested explanation for lake basin formation in Cordilleran-type orogenies. We argue that the hydrologic closure of both the foreland (early Eocene) and hinterland (late Eocene) of the North American Cordillera were caused by a trenchward-migrating wave of dynamic and thermal topography resulting from progressive removal of the Farallon flat-slab. Two major episodes of hydrologic drainage closure are recorded by Eocene terrestrial strata in the western United States. The first occurred in the retroarc foreland during the early Eocene, and resulted in the deposition of the Green River Fm. The second occurred in the hinterland during the late Eocene and resulted in accumulation of the Elko Fm. In both regions, lake strata overlie fluvial strata and become progressively more evaporative up-section, and are overlain by volcaniclastic strata. Both successions were then truncated by regional unconformities that extend until the Oligocene. We interpret these stratigraphic successions to record trenchward propagation of a regional topographic wave, caused by slab rollback. Migration of the slab-hinge initially caused dynamic subsidence and initiation of lacustrine deposition. Regional surface uplift followed, and was associated with scattered volcanism. Uplift promoted formation of endorheic basins and ultimately the development of regional unconformities. The height of the uplift can be roughly approximated by the preserved thickness of lacustrine and other nonmarine deposits at both locations (0.2-1.0 km). The 40Ar/39Ar and U-Pb geochronology of Green River Fm ash beds indicate that this surface topographic wave migrated trenchward (SW) across the foreland from 53 to 47 Ma at a velocity of ~6 cm/yr. Single crystal sanidine 40Ar/39Ar ages for ash beds within the Elko Fm indicate hydrologic ponding from 43 to 38 Ma. The 4 myr gap between Green River and Elko Fm deposition may represent the time required for the rollback wave to transit the steep eastern slope of the Sevier fold-thrust belt.

  10. Development of explosively driven launcher for meteoroid studies

    NASA Technical Reports Server (NTRS)

    Baum, D. W.

    1973-01-01

    The results of a continuing program to develop an explosively driven 2-stage hypervelocity launcher capable of achieving velocities between 15 and 20 km/sec are described. Previous efforts had identified incomplete barrel collapse as a limiting factor in launcher performance. Correlation of experimental and computational results obtained in the present study indicate that boundary-layer gases within the barrel act to prevent complete closure. Simplified calculations suggest that in-contact explosives may have insufficient energy densities to collapse the barrel against a developed boundary layer. Higher energy densities, sufficient to produce complete closure, were obtained with the use of steel flyer plates accelerated by a phased explosive lens. However, when flat flyer plates were impacted on the barrel, the sides of the barrel were observed to rupture and leak gas prior to barrel closure. A promising solution to this problem (untested) is to produce a symmetrical collapse with a cylindrical tube around the barrel.

  11. Partial Cavity Flows at High Reynolds Numbers

    NASA Astrophysics Data System (ADS)

    Makiharju, Simo; Elbing, Brian; Wiggins, Andrew; Dowling, David; Perlin, Marc; Ceccio, Steven

    2009-11-01

    Partial cavity flows created for friction drag reduction were examined on a large-scale. Partial cavities were investigated at Reynolds numbers up to 120 million, and stable cavities with frictional drag reduction of more than 95% were attained at optimal conditions. The model used was a 3 m wide and 12 m long flat plate with a plenum on the bottom. To create the partial cavity, air was injected at the base of an 18 cm backwards-facing step 2.1 m from the leading edge. The geometry at the cavity closure was varied for different flow speeds to optimize the closure of the cavity. Cavity gas flux, thickness, frictional loads, and cavity pressures were measured over a range of flow speeds and air injection fluxes. High-speed video was used extensively to investigate the unsteady three dimensional cavity closure, the overall cavity shape and oscillations.

  12. 75 FR 51285 - In the Matter of Certain Flat Panel Digital Televisions and Components Thereof; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... INTERNATIONAL TRADE COMMISSION [Inv. No. 337-TA-733] In the Matter of Certain Flat Panel Digital... importation, and the sale within the United States after importation of certain flat panel digital televisions... sale within the United States after importation of certain flat panel digital televisions and...

  13. 40 CFR 267.143 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Financial assurance for closure. 267... PERMIT Financial Requirements § 267.143 Financial assurance for closure. The owner or operator must establish financial assurance for closure of each storage or treatment unit that he owns or operates. In...

  14. The Integration of the 241-Z Building Decontamination and Decommissioning Under Cercla with RCRA Closure at the Plutonium Finishing Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattlin, E.; Charboneau, S.; Johnston, G.

    2007-07-01

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the Resource Conservation and Recovery Act of 1976 (RCRA) and Washington State Hazardous Waste Management Act, RCW 70.105, , have been deactivated and are being actively decommissioned under the provisions of the Hanford Federal Facility Agreement and Consent Order (HFFACO), RCRA and Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) 42 U.S.C. 9601 et seq. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4,more » D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building. The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground piping from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions will address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the Hanford Facility Dangerous Waste Closure Plan, 241-Z Treatment and Storage Tanks. Under the RCRA closure plan, the 241-Z TSD unit is anticipated to undergo clean closure to the performance standards of the State of Washington with respect to dangerous waste contamination from RCRA operations. The TSD unit will be clean closed if physical closure activities identified in the plan achieve clean closure standards for all 241-Z locations. Clean closed 241-Z treatment and storage tanks, equipment and/or structures will remain after RCRA clean closure for future disposition in conjunction with PFP decommissioning activities which are integrated with CERCLA. (authors)« less

  15. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  16. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  17. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  18. 40 CFR 265.1202 - Closure and post-closure care.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., STORAGE, AND DISPOSAL FACILITIES Hazardous Waste Munitions and Explosives Storage § 265.1202 Closure and... as long as it remains in service as a munitions or explosives magazine or storage unit. (b) If, after...

  19. Closure Report for Corrective Action Unit 127: Areas 25 and 26 Storage Tanks, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    CAU 127, Areas 25 and 26 Storage Tanks, consists of twelve CASs located in Areas 25 and 26 of the NTS. The closure alternatives included no further action, clean closure, and closure in place with administrative controls. The purpose of this Closure Report is to provide a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  20. Hanford Facility Dangerous Waste Closure Plan - Plutonium Finishing Plant Treatment Unit Glovebox HA-20MB

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PRIGNANO, A.L.

    2003-06-25

    This closure plan describes the planned activities and performance standards for closing the Plutonium Finishing Plant (PFP) glovebox HA-20MB that housed an interim status ''Resource Conservation and Recovery Act'' (RCRA) of 1976 treatment unit. This closure plan is certified and submitted to Ecology for incorporation into the Hanford Facility RCRA Permit (HF RCRA Permit) in accordance with Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement; TPA) Milestone M-83-30 requiring submittal of a certified closure plan for ''glovebox HA-20MB'' by July 31, 2003. Glovebox HA-20MB is located within the 231-5Z Building in the 200 West Area of the Hanford Facility.more » Currently glovebox HA-20MB is being used for non-RCRA analytical purposes. The schedule of closure activities under this plan supports completion of TPA Milestone M-83-44 to deactivate and prepare for dismantlement the above grade portions of the 234-5Z and ZA, 243-Z, and 291-Z and 291-Z-1 stack buildings by September 30, 2015. Under this closure plan, glovebox HA-20MB will undergo clean closure to the performance standards of Washington Administrative Code (WAC) 173-303-610 with respect to all dangerous waste contamination from glovebox HA-20MB RCRA operations. Because the intention is to clean close the PFP treatment unit, postclosure activities are not applicable to this closure plan. To clean close the unit, it will be demonstrated that dangerous waste has not been left at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or is environmentally impractical, the closure plan will be modified to address required postclosure activities. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. Any information on radionuclides is provided only for general knowledge. Clearance form only sent to RHA.« less

  1. 40 CFR 258.72 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance with the post-closure plan developed under § 258.61 of this part. The post-closure cost estimate used...

  2. Fabric panel clean change-out frame

    DOEpatents

    Brown, Ronald M.

    1995-01-31

    A fabric panel clean change-out frame, for use on a containment structure having rigid walls, is formed of a compression frame and a closure panel. The frame is formed of elongated spacers, each carrying a plurality of closely spaced flat springs, and each having a hooked lip extending on the side of the spring facing the spacer. The closure panel is includes a perimeter frame formed of flexible, wedge-shaped frame members that are receivable under the springs to deflect the hooked lips. A groove on the flexible frame members engages the hooked lips and locks the frame members in place under the springs. A flexible fabric panel is connected to the flexible frame members and closes its center.

  3. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    2006-09-01

    This Closure Report (CR) describes the closure activities performed at CAU 528, Polychlorinated Biphenyls Contamination, as presented in the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) (US. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSAINSO], 2005). The approved closure alternative was closure in place with administrative controls. This CR provides a summary of the completed closure activities, documentation of waste disposal, and analytical data to confirm that the remediation goals were met.

  4. Analysis on influence of guide vanes closure laws of pump-turbine on load rejection transient process

    NASA Astrophysics Data System (ADS)

    Yao, Z.; Bi, H. L.; Huang, Q. S.; Li, Z. J.; Wang, Z. W.

    2013-12-01

    In load rejection transient process, the sudden shut down of guide vanes may cause units speed rise and a sharp increase in water hammer pressure of diversion system, which endangers the safety operation of the power plant. Adopting reasonable guide vane closure law is a kind of economic and effective measurement to reduce the water hammer pressure and limit rotational speed increases. In this paper, combined with Guangzhou Pumped Storage Power Station plant A, the load rejection condition under different guide vanes closure laws is calculated and the key factor of guide vanes closure laws on the impact of the load rejection transition process is analyzed. The different inflection points, which are the closure modes, on the impact of unit speed change, water level fluctuation of surge tank, and the pressure fluctuation of volute inlet and draft tube inlet are further discussed. By compared with the calculation results, a reasonable guide vanes inflection point position can be determined according to security requirements and a reasonable guide vanes closure law can be attained to effectively coordinate the unit speed rise and the rapid pressure change in the load rejection transient process.

  5. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  6. Performance characteristics of a novel blood bag in-line closure device and subsequent product quality assessment

    PubMed Central

    Serrano, Katherine; Levin, Elena; Culibrk, Brankica; Weiss, Sandra; Scammell, Ken; Boecker, Wolfgang F; Devine, Dana V

    2010-01-01

    BACKGROUND In high-volume processing environments, manual breakage of in-line closures can result in repetitive strain injury (RSI). Furthermore, these closures may be incorrectly opened causing shear-induced hemolysis. To overcome the variability of in-line closure use and minimize RSI, Fresenius Kabi developed a new in-line closure, the CompoFlow, with mechanical openers. STUDY DESIGN AND METHODS The consistency of the performance of the CompoFlow closure device was assessed, as was its effect on component quality. A total of 188 RBC units using CompoFlow blood bag systems and 43 using the standard bag systems were produced using the buffy coat manufacturing method. Twenty-six CompoFlow platelet (PLT) concentrates and 10 control concentrates were prepared from pools of four buffy coats. RBCs were assessed on Days 1, 21, and 42 for cellular variables and hemolysis. PLTs were assessed on Days 1, 3, and 7 for morphology, CD62P expression, glucose, lactate, and pH. A total of 308 closures were excised after processing and the apertures were measured using digital image analysis. RESULTS The use of the CompoFlow device significantly improved the mean extraction time with 0.46 ± 0.11 sec/mL for the CompoFlow units and 0.52 ± 0.13 sec/mL for the control units. The CompoFlow closures showed a highly reproducible aperture after opening (coefficient of variation, 15%) and the device always remained opened. PLT and RBC products showed acceptable storage variables with no differences between CompoFlow and control. CONCLUSIONS The CompoFlow closure devices improved the level of process control and processing time of blood component production with no negative effects on product quality. PMID:20529007

  7. 40 CFR 265.120 - Certification of completion of post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... each hazardous waste disposal unit, the owner or operator must submit to the Regional Administrator, by registered mail, a certification that the post-closure care period for the hazardous waste disposal unit was...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT...

  8. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  9. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  10. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  11. 40 CFR 258.50 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... in § 258.2) during the active life of the unit and the post-closure care period. This demonstration... shall be conducted throughout the active life and post-closure care period of that MSWLF unit as... scientist or engineer who has received a baccalaureate or post-graduate degree in the natural sciences or...

  12. About the coupling of turbulence closure models with averaged Navier-Stokes equations

    NASA Technical Reports Server (NTRS)

    Vandromme, D.; Ha Minh, H.

    1986-01-01

    The MacCormack implicit predictor-corrector model (1981) for numerical solution of the coupled Navier-Stokes equations for turbulent flows is extended to nonconservative multiequation turbulence models, as well as the inclusion of second-order Reynolds stress turbulence closure. A scalar effective pressure turbulent contribution to the pressure field is defined to approximate the effects of the Reynolds stress in strongly sheared flows. The Jacobian matrices of the transport equations are diagonalized to reduce the required computer memory and run time. Techniques are defined for including turbulence in the diagonalization. Application of the method is demonstrated with solutions generated for transonic nozzle flow and for the interaction between a supersonic flat plate boundary layer and a 12 deg compression-expansion ramp.

  13. Cost-effectiveness of Ward Closure to Control Outbreaks of Norovirus Infection in United Kingdom National Health Service Hospitals.

    PubMed

    Sadique, Zia; Lopman, Ben; Cooper, Ben S; Edmunds, W John

    2016-02-01

    Norovirus is the most common cause of outbreaks of acute gastroenteritis in National Health Service hospitals in the United Kingdom. Wards (units) are often closed to new admissions to stop the spread of the virus, but there is limited evidence describing the cost-effectiveness of ward closure. An economic analysis based on the results from a large, prospective, active-surveillance study of gastroenteritis outbreaks in hospitals and from an epidemic simulation study compared alternative ward closure options evaluated at different time points since first infection, assuming different efficacies of ward closure. A total of 232 gastroenteritis outbreaks occurring in 14 hospitals over a 1-year period were analyzed. The risk of a new outbreak in a hospital is significantly associated with the number of admission, general medical, and long-stay wards that are concurrently affected but is less affected by the level of community transmission. Ward closure leads to higher costs but reduces the number of new outbreaks by 6%-56% and the number of clinical cases by 1%-55%, depending on the efficacy of the intervention. The incremental cost per outbreak averted varies from £10 000 ($14 000) to £306 000 ($428 000), and the cost per case averted varies from £500 ($700) to £61 000 ($85 000). The cost-effectiveness of ward closure decreases as the efficacy of the intervention increases, and the cost-effectiveness increases with the timing of the intervention. The efficacy of ward closure is critical from a cost-effectiveness perspective. Ward closure may be cost-effective, particularly if targeted to high-throughput units. Published by Oxford University Press for the Infectious Diseases Society of America 2016. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  14. Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-02-21

    This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111more » (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.« less

  15. Addendum to the Closure Report for Corrective Action Unit 411: Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burmeister, Mark

    2016-11-01

    The Corrective Action Unit (CAU) 411 Closure Report (CR) was published in June 2016 (NNSA/NFO, 2016). The purpose of this addendum is to clarify language in the CR relating to the field instrument for the detection of low-energy radiation (FIDLER), provide the waste disposal documentation for waste generated during the corrective action investigation (CAI), and reference a letter from the U.S. Air Force (USAF) regarding the closure of CAU 411.

  16. 76 FR 39313 - Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    .... 100804323-0569-02] RIN 0648-XA523 Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries; Closure of the Directed Butterfish Fishery AGENCY: National Marine Fisheries Service...; closure. SUMMARY: NMFS announces that the directed fishery for butterfish in the Exclusive Economic Zone...

  17. Near-wall modelling of compressible turbulent flows

    NASA Technical Reports Server (NTRS)

    So, Ronald M. C.

    1990-01-01

    Work was carried out to extend the near-wall models formulated for the incompressible Reynolds stress equations to compressible flows. The idea of splitting the compressible dissipation function into a solenoidal part that is not sensitive to changes of compressibility indicators and a compressible part that is directly affected by these changes is adopted. This means that all models involving the dissipation rate could be expressed in terms of the solenoidal dissipation rate and an equation governing its transport could be formulated to close the set of compressible Reynolds stress equations. The near-wall modelling of the dissipation rate equation is investigated and its behavior near a wall is studied in detail using k-epsilon closure. It is found that all existing modelled equations give the wrong behavior for the dissipation rate near a wall. Improvements are suggested and the resultant behavior is found to be in good agreement with near-wall data. Furthermore, the present modified k-epsilon closure is used too calculate a flat plate boundary layer and the results are compared with four existing k-epsilon closures. These comparisons show that all closures tested give essentially the same flow properties, except in a region very close to the wall. In this region, the present k-epsilon closure calculations are in better agreement with measurements and direct simulation data; in particular, the behavior of the dissipation rate.

  18. 36 CFR 13.1120 - Bartlett Cove Developed Area closures and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... closures and restrictions. 13.1120 Section 13.1120 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay National Park and Preserve Bartlett Cove § 13.1120 Bartlett Cove Developed Area closures and restrictions...

  19. 36 CFR 13.1120 - Bartlett Cove Developed Area closures and restrictions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... closures and restrictions. 13.1120 Section 13.1120 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay National Park and Preserve Bartlett Cove § 13.1120 Bartlett Cove Developed Area closures and restrictions...

  20. 36 CFR 13.1120 - Bartlett Cove Developed Area closures and restrictions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... closures and restrictions. 13.1120 Section 13.1120 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay National Park and Preserve Bartlett Cove § 13.1120 Bartlett Cove Developed Area closures and restrictions...

  1. 40 CFR 264.120 - Certification of completion of post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... certification that the post-closure care period for the hazardous waste disposal unit was performed in...) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND... later than 60 days after completion of the established post-closure care period for each hazardous waste...

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less

  3. A Designer Fluid For Aluminum Phase Change Devices. Performance Enhancement in Copper Heat Pipes Performance Enhancement in Copper Heat Pipes. Volume 3

    DTIC Science & Technology

    2016-11-17

    out dynamics of a designer fluid were investigated experimentally in a flat grooved heat pipe. Generated coatings were observed during heat pipe... experimental temperature distributions matched well. Uncertainties in the closure properties were the major source of error. 15. SUBJECT TERMS...72  Results and Discussion ( Experimental Results for IAS 2 in Grooved Wick #1

  4. Assessing Hydrologic Impacts of Land Configuration Changes Using an Integrated Hydrologic Model at the Rocky Flats Environmental Technology Site, Colorado

    NASA Astrophysics Data System (ADS)

    Prucha, R. H.; Dayton, C. S.; Hawley, C. M.

    2002-12-01

    The Rocky Flats Environmental Technology Site (RFETS) in Golden, Colorado, a former Department of Energy nuclear weapons manufacturing facility, is currently undergoing closure. The natural semi-arid interaction between surface and subsurface flow at RFETS is complex and complicated by the industrial modifications to the flow system. Using a substantial site data set, a distributed parameter, fully-integrated hydrologic model was developed to assess the hydrologic impact of different hypothetical site closure configurations on the current flow system and to better understand the integrated hydrologic behavior of the system. An integrated model with this level of detail has not been previously developed in a semi-arid area, and a unique, but comprehensive, approach was required to calibrate and validate the model. Several hypothetical scenarios were developed to simulate hydrologic effects of modifying different aspects of the site. For example, some of the simulated modifications included regrading the current land surface, changing the existing surface channel network, removing subsurface trenches and gravity drain flow systems, installing a slurry wall and geotechnical cover, changing the current vegetative cover, and converting existing buildings and pavement to permeable soil areas. The integrated flow model was developed using a rigorous physically-based code so that realistic design parameters can simulate these changes. This code also permitted evaluation of changes to complex integrated hydrologic system responses that included channelized and overland flow, pond levels, unsaturated zone storage, groundwater heads and flow directions, and integrated water balances for key areas. Results generally show that channel flow offsite decreases substantially for different scenarios, while groundwater heads generally increase within the reconfigured industrial area most of which is then discharged as evapotranspiration. These changes have significant implications to site closure and operation.

  5. Safety Oversight of Decommissioning Activities at DOE Nuclear Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zull, Lawrence M.; Yeniscavich, William

    2008-01-15

    The Defense Nuclear Facilities Safety Board (Board) is an independent federal agency established by Congress in 1988 to provide nuclear safety oversight of activities at U.S. Department of Energy (DOE) defense nuclear facilities. The activities under the Board's jurisdiction include the design, construction, startup, operation, and decommissioning of defense nuclear facilities at DOE sites. This paper reviews the Board's safety oversight of decommissioning activities at DOE sites, identifies the safety problems observed, and discusses Board initiatives to improve the safety of decommissioning activities at DOE sites. The decommissioning of former defense nuclear facilities has reduced the risk of radioactive materialmore » contamination and exposure to the public and site workers. In general, efforts to perform decommissioning work at DOE defense nuclear sites have been successful, and contractors performing decommissioning work have a good safety record. Decommissioning activities have recently been completed at sites identified for closure, including the Rocky Flats Environmental Technology Site, the Fernald Closure Project, and the Miamisburg Closure Project (the Mound site). The Rocky Flats and Fernald sites, which produced plutonium parts and uranium materials for defense needs (respectively), have been turned into wildlife refuges. The Mound site, which performed R and D activities on nuclear materials, has been converted into an industrial and technology park called the Mound Advanced Technology Center. The DOE Office of Legacy Management is responsible for the long term stewardship of these former EM sites. The Board has reviewed many decommissioning activities, and noted that there are valuable lessons learned that can benefit both DOE and the contractor. As part of its ongoing safety oversight responsibilities, the Board and its staff will continue to review the safety of DOE and contractor decommissioning activities at DOE defense nuclear sites.« less

  6. DISPOSITION PATHS FOR ROCKY FLATS GLOVEBOXES: EVALUATING OPTIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lobdell, D.; Geimer, R.; Larsen, P.

    2003-02-27

    The Kaiser-Hill Company, LLC has the responsibility for closure activities at the Rocky Flats Environmental Technology Site (RFETS). One of the challenges faced for closure is the disposition of radiologically contaminated gloveboxes. Evaluation of the disposition options for gloveboxes included a detailed analysis of available treatment capabilities, disposal facilities, and lifecycle costs. The Kaiser-Hill Company, LLC followed several processes in determining how the gloveboxes would be managed for disposition. Currently, multiple disposition paths have been chosen to accommodate the needs of the varying styles and conditions of the gloveboxes, meet the needs of the decommissioning team, and to best managemore » lifecycle costs. Several challenges associated with developing a disposition path that addresses both the radiological and RCRA concerns as well as offering the most cost-effective solution were encountered. These challenges included meeting the radiological waste acceptance criteria of available disposal facilities, making a RCRA determination, evaluating treatment options and costs, addressing void requirements associated with disposal, and identifying packaging and transportation options. The varying disposal facility requirements affected disposition choices. Facility conditions that impacted decisions included radiological and chemical waste acceptance criteria, physical requirements, and measurement for payment options. The facility requirements also impacted onsite activities including management strategies, decontamination activities, and life-cycle cost.« less

  7. Association of land use and its change with beach closure in the United States, 2004-2013

    EPA Science Inventory

    Land use and its change have great influences on water quality. However, their impacts on microbial contamination of beach water have been rarely investigated and their relationship with beach closure is still unknown. Here, we analyzed beach closure data obtained from 2004 to 20...

  8. 40 CFR 258.72 - Financial assurance for post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... care. 258.72 Section 258.72 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... assurance for post-closure care. (a) The owner or operator must have a detailed written estimate, in current dollars, of the cost of hiring a third party to conduct post-closure care for the MSWLF unit in compliance...

  9. 78 FR 76759 - Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Trimester Closure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-19

    ... Fishery; Trimester Closure for the Common Pool Fishery AGENCY: National Marine Fisheries Service (NMFS... Trimester 3, from January 1, 2014, through April 30, 2014, to common pool vessels, because the Trimester 3... intended to prevent the overharvest of the common pool's allocation of GOM haddock. DATES: The closure of...

  10. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilborn, Bill R.; Boehlecke, Robert F.

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less

  11. 3718-F Alkali Metal Treatment and Storage Facility Closure Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Since 1987, Westinghouse Hanford Company has been a major contractor to the U.S. Department of Energy-Richland Operations Office and has served as co-operator of the 3718-F Alkali Metal Treatment and Storage Facility, the waste management unit addressed in this closure plan. The closure plan consists of a Part A Dangerous waste Permit Application and a RCRA Closure Plan. An explanation of the Part A Revision (Revision 1) submitted with this document is provided at the beginning of the Part A section. The closure plan consists of 9 chapters and 5 appendices. The chapters cover: introduction; facility description; process information; wastemore » characteristics; groundwater; closure strategy and performance standards; closure activities; postclosure; and references.« less

  12. "We Felt They Took the Heart out of the Community": Examining a Community-Based Response to Urban School Closure

    ERIC Educational Resources Information Center

    Green, Terrance L.

    2017-01-01

    Massive school closures are occurring in urban school districts across the United States. Research suggests that school closures are the outcome of racialized neoliberal policies and decades of disinvestment that have left many urban districts with fiscal deficits and declining student enrollments. However, some urban communities have successfully…

  13. Efforts of the occupant to change physical quality of residential unit through the change of building material at low cost flats in Jakarta

    NASA Astrophysics Data System (ADS)

    Nurdiani, N.

    2018-03-01

    Low cost flats in Jakarta – Indonesia is provided by the government for low-income people in urban areas, in line with the program to redevelop or renew slum areas. Low cost flat is built with the minimum standard of building materials. The purpose of this study is to know efforts of the occupants to change of building materials at residential unit of low cost flats. The research was conducted by descriptive method at four of low cost housing in Jakarta: Rusuna Bendungan Hilir 1, Rusuna Tambora IIIA, Rusuna Bidara Cina, and Rusuna Sukapura. The results showed that physical changes which happened in low cost flats are aesthetic (residence paint color change), or improvement of physical quality of residential unit (change of building material), become dominant aspects done by residents in four rusuna.

  14. For current viewing resistor loads

    DOEpatents

    Lyons, Gregory R [Tijeras, NM; Hass, Jay B [Lee's Summit, MO

    2011-04-19

    The invention comprises a terminal unit for a flat cable comprising a BNC-PCB connector having a pin for electrically contacting one or more conducting elements of a flat cable, and a current viewing resistor having an opening through which the pin extends and having a resistor face that abuts a connector face of the BNC-PCB connector, wherein the device is a terminal unit for the flat cable.

  15. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less

  17. Babies born before arrival to hospital and maternity unit closures in Queensland and Australia.

    PubMed

    Kildea, Sue; McGhie, Alexandra C; Gao, Yu; Rumbold, Alice; Rolfe, Margaret

    2015-09-01

    Evidence suggests the closure of maternity units is associated with an increase in babies born before arrival (BBA). To explore the association between the number of maternity units in Australia and Queensland by birthing numbers, BBA rate and geographic remoteness of the health district where the mother lives. A retrospective study utilised routinely collected perinatal data (1992-2011). Pearson correlation tested the relationship between BBA rate and number of maternity units. Linear regression examined this association over time. During 1992-2011, the absolute numbers (N=22,814) of women having a BBA each year in Australia increased by 47% (N=836-1233); and 206% (n=140-429) in Queensland. This coincided with a 41% reduction in maternity units in Australia (N=623-368=18 per year) and a 28% reduction in Queensland (n=129-93). BBA rates increased significantly across Australia, r=0.837, n=20 years, p<0.001 and Queensland, r=0.917, n=20 years, p<0.001 and this was negatively correlated with the number of maternity units in Australia, r=-0.804, n=19 years, p<0.001 and Queensland, r=-0.906, n=19 years, p<0.001. The closure of maternity units over a 20-year period across Australia and Queensland is significantly associated with increased BBA rates. The distribution is not limited to rural and remote areas. Given the high risk of adverse maternal and neonatal outcomes associated with BBA, it is time to revisit the closure of units. Copyright © 2015 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  18. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT165: AREA 25 AND 26 DRY WELL AND WASH DOWN AREAS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BECHTEL NEVADA

    This Closure Report (CR) documents the closure activities for Corrective Action Unit (CAU) 165, Area 25 and 26 Dry Well and Washdown Areas, according to the Federal Facility Agreement and Consent Order (FFACO) of 1996. CAU 165 consists of 8 Corrective Action Sites (CASs) located in Areas 25 and 26 of the Nevada Test Site (NTS). The NTS is located approximately 105 kilometers (65 miles) northwest of Las Vegas, nevada. Site closure activities were performed according to the Nevada Division of Environmental Protection (NDEP)-approved Corrective Action Plan (CAP) for CAU 165. CAU 165 consists of the following CASs: (1) CASmore » 25-07-06, Train Decontamination Area; (2) CAS 25-07-07, Vehicle Washdown; (3) CAS 25-20-01, Lab Drain Dry Well; (4) CAS 25-47-01, Reservoir and French Drain; (5) CAS 25-51-02, Drywell; (6) CAS 25-59-01, Septic System; (7) CAS 26-07-01, Vehicle Washdown Station; and (8) CAS 26-59-01, Septic System. CAU 165, Area 25 and 26 Dry Well and Washdown Areas, consists of eight CASs located in Areas 25 and 26 of the NTS. The approved closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls.« less

  19. Transcatheter Closure of Patent Foramen Ovale: Devices and Technique.

    PubMed

    Price, Matthew J

    2017-10-01

    Transcatheter closure of a patent foramen ovale (PFO) reduces the risk of recurrent cryptogenic stroke compared with medical therapy. PFO closure is a prophylactic procedure, and will not provide the patient with symptomatic improvement, except in cases of hypoxemia due to right-to-left shunt or possibly migraine headaches. Therefore, appropriate patient selection is critical, and procedural safety is paramount. Herein, we review key characteristics of the devices currently available for transcatheter PFO closure within the United States, and highlight key technical aspects of the PFO closure procedure that will maximize procedural success. Copyright © 2017 Elsevier Inc. All rights reserved.

  20. NUCLEAR CLEANUP: Progress Made at Rocky Flats, but Closure by 2006 Is Unlikely, and Costs May Increase

    DTIC Science & Technology

    2001-02-01

    liquids or residues from process pipes and tanks. The contractor also dismantled plutonium - processing furnaces, stripped out contaminated process...Soil Cleanup Levels on the Scope and Cost of the 903 Pad Cleanup 30 Figures Figure 1: Workers in Protective Clothing Handling Plutonium - Contaminated ...activities—shipping nuclear materials such as plutonium - contaminated metals and powders—is expected to be completed in 2002. Another activity

  1. Recapitalizing Nuclear Weapons (Walker Paper, Number 8)

    DTIC Science & Technology

    2007-08-01

    Sandia National Laboratories, with cam- puses in California and New Mexico), four production plants (the Pantex Plant in Amarillo, TX; the Y-12 Plant in...Oak Ridge, TN; the Kansas City Plant in Kansas City, MO; and the Savan- nah River Site in Savannah River, SC), and the Nevada Test Site. The fall...this infrastructure (e.g., closures of Rocky Flats, Mound, and Pinellas facilities). At the same time, investments in the remaining supporting

  2. Proposed Deactivation and Closure of Federal Prison Camp, Nellis Air Force Base, Nevada. Environmental Assessment

    DTIC Science & Technology

    2006-01-01

    SITE CHARACTERISTICS l. Topography Nellis A1r Force Base is situated in the Basin and Range physiographic province, which is characterized by...nrrmerous elongated mountain ranges separated by similarly shaped valleys ( basins ). The difference in elevations between mountaintops and adjacent valley...s1tuated within the w Vegas Basin portion of Las Vegas Valley. Topography ts characterized prtmartly by flat alluVlal deposits \\\\~thin the valley

  3. 75 FR 60740 - Record of Decision for the Base Closure and Realignment Beddown and Flight Operations of Remotely...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... DEPARTMENT OF DEFENSE Department of the Air Force Record of Decision for the Base Closure and Realignment Beddown and Flight Operations of Remotely Piloted Aircraft at Grand Forks Air Force Base (AFB), ND... United States Air Force signed the ROD for the 2005 Base Closure and Realignment (BRAC 2005) directed...

  4. Impact of Vial Capping on Residual Seal Force and Container Closure Integrity.

    PubMed

    Mathaes, Roman; Mahler, Hanns-Christian; Roggo, Yves; Ovadia, Robert; Lam, Philippe; Stauch, Oliver; Vogt, Martin; Roehl, Holger; Huwyler, Joerg; Mohl, Silke; Streubel, Alexander

    2016-01-01

    The vial capping process is a critical unit operation during drug product manufacturing, as it could possibly generate cosmetic defects or even affect container closure integrity. Yet there is significant variability in capping equipment and processes, and their relation to potential defects or container closure integrity has not been thoroughly studied. In this study we applied several methods-residual seal force tester, a self-developed system of a piezo force sensor measurement, and computed tomography-to characterize different container closure system combinations that had been sealed using different capping process parameter settings. Additionally, container closure integrity of these samples was measured using helium leakage (physical container closure integrity) and compared to characterization data. The different capping equipment settings lead to residual seal force values from 7 to 115 N. High residual seal force values were achieved with high capping pre-compression force and a short distance between the capping plate and plunge. The choice of container closure system influenced the obtained residual seal force values. The residual seal force tester and piezoelectric measurements showed similar trends. All vials passed physical container closure integrity testing, and no stopper rupture was seen with any of the settings applied, suggesting that container closure integrity was warranted for the studied container closure system with the chosen capping setting ranges. The vial capping process is a critical unit operation during drug product manufacturing, as it could possibly generate cosmetic defects or even affect container closure integrity. Yet there is significant variability in capping equipment and processes, and their relation to potential defects or container closure integrity has not been thoroughly studied. In this study we applied several methods-residual seal force tester, a self-developed system of a piezo force sensor measurement, and computed tomography-to characterize different container closure system combinations that had been sealed using different capping process parameter settings. The residual seal force tester can analyze a variety of different container closure systems independent of the capping equipment. An adequate and safe residual seal force range for each container closure system configuration can be established with the residual seal force tester and additional methods like computed tomography scans and leak testing. In the residual seal force range studied, the physical container closure integrity of the container closure system was warranted. © PDA, Inc. 2016.

  5. Characterization of Uranium Contamination, Transport, and Remediation at Rocky Flats - Across Remediation into Post-Closure

    NASA Astrophysics Data System (ADS)

    Janecky, D. R.; Boylan, J.; Murrell, M. T.

    2009-12-01

    The Rocky Flats Site is a former nuclear weapons production facility approximately 16 miles northwest of Denver, Colorado. Built in 1952 and operated by the Atomic Energy Commission and then Department of Energy, the Site was remediated and closed in 2005, and is currently undergoing long-term surveillance and monitoring by the DOE Office of Legacy Management. Areas of contamination resulted from roughly fifty years of operation. Of greatest interest, surface soils were contaminated with plutonium, americium, and uranium; groundwater was contaminated with chlorinated solvents, uranium, and nitrates; and surface waters, as recipients of runoff and shallow groundwater discharge, have been contaminated by transport from both regimes. A region of economic mineralization that has been referred to as the Colorado Mineral Belt is nearby, and the Schwartzwalder uranium mine is approximately five miles upgradient of the Site. Background uranium concentrations are therefore elevated in many areas. Weapons-related activities included work with enriched and depleted uranium, contributing anthropogenic content to the environment. Using high-resolution isotopic analyses, Site-related contamination can be distinguished from natural uranium in water samples. This has been instrumental in defining remedy components, and long-term monitoring and surveillance strategies. Rocky Flats hydrology interlinks surface waters and shallow groundwater (which is very limited in volume and vertical and horizontal extent). Surface water transport pathways include several streams, constructed ponds, and facility surfaces. Shallow groundwater has no demonstrated connection to deep aquifers, and includes natural preferential pathways resulting primarily from porosity in the Rocky Flats alluvium, weathered bedrock, and discontinuous sandstones. In addition, building footings, drains, trenches, and remedial systems provide pathways for transport at the site. Removal of impermeable surfaces (buildings, roads, and so on) during the Site closure efforts resulted in major changes to surface and shallow groundwater flow. Consistent with previous documentation of uranium operations and contamination, only very small amounts of highly enriched uranium are found in a small number of water samples, generally from the former Solar Ponds complex and central Industrial Area. Depleted uranium is more widely distributed at the site, and water samples exhibit the full range of depleted plus natural uranium mixtures. However, one third of the samples are found to contain only natural uranium, and three quarters of the samples are found to contain more than 90% natural uranium - substantial fractions given that the focus of these analyses was on evaluating potentially contaminated waters. Following site closure, uranium concentrations have increased at some locations, particularly for surface water samples. Overall, isotopic ratios at individual locations have been relatively consistent, indicating that the increases in concentrations are due to decreases in dilution flow following removal of impermeable surfaces and buildings.

  6. 75 FR 51286 - Certain Flat Panel Digital Televisions and Components Thereof; Notice of Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... INTERNATIONAL TRADE COMMISSION [Inv. No. 337-TA-733] Certain Flat Panel Digital Televisions and... importation, and the sale within the United States after importation of certain flat panel digital televisions... after importation of certain flat panel digital televisions and components thereof that infringe one or...

  7. Participation in Lifelong Learning: Reality or Myth? Issues Arising from a United Kingdom Coalfield Closure

    ERIC Educational Resources Information Center

    Thursfield, Denise; Henderson, Roger

    2004-01-01

    In the spring of 2004, the Selby Coalfield, the largest of the remaining coal mines in the United Kingdom (UK) will close and 2071 employees will lose their jobs. The impact of the closure will be severe in the surrounding area, and will present a challenge to local employment services and training agencies. It will also test the UK government's…

  8. Closure Report for Corrective Action Unit 415: Project 57 No. 1 Plutonium Dispersion (NTTR) Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cabble, Kevin J.; Boehlecke, Robert F.

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 415: Project 57 No. 1 Plutonium Dispersion, which is located on Range 4808A of the Nevada Test and Training Range (NTTR). This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. CAU 415 comprises one corrective action site (CAS): NAFR-23-02, Pu Contaminated Soil. The purpose of this CR is to provide justification and documentation supporting the recommendationmore » that no further corrective action is needed for CAU 415 based on the implementation of the corrective action of Closure in Place.« less

  9. Defense Base Closure and Realignment Commission

    DTIC Science & Technology

    1993-01-01

    during, their training . DLI required Only 803 houising units oii thle Army students inl thle human intelligence field Annex, the post cýxchiaige arid...community also stressed the Navy did not proposes significantly reduccd closure costs by know the true cost of relocating or replicating taking...Warfare Center- Carderock, Annapolis Detachment, The Annapolis community stressed in 1991 theDefense Base Closure and Realignment Coin- Annapolis

  10. Closure Report for Corrective Action Unit 426: Cactus Spring Waste Trenches, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dave Madsen

    This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less

  11. 78 FR 75371 - Diffusion-Annealed, Nickel-Plated Flat-Rolled Steel Products From Japan; Scheduling of the Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ...-Plated Flat-Rolled Steel Products From Japan; Scheduling of the Final Phase of an Antidumping... imports from Japan of diffusion-annealed, nickel- plated flat-rolled steel products, provided for... diffusion-annealed, nickel- plated flat-rolled steel products from Japan are being sold in the United States...

  12. Resource Conservation and Recovery Act (RCRA) Part B permit application for tank storage units at the Oak Ridge Y-12 Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-05-01

    In compliance with the Resource Conservation and Recovery Act (RCRA), this report discusses information relating to permit applications for three tank storage units at Y-12. The storage units are: Building 9811-1 RCRA Tank Storage Unit (OD-7); Waste Oil/Solvent Storage Unit (OD-9); and Liquid Organic Solvent Storage Unit (OD-10). Numerous sections discuss the following: Facility description; waste characteristics; process information; groundwater monitoring; procedures to prevent hazards; contingency plan; personnel training; closure plan, post closure plan, and financial requirements; record keeping; other federal laws; organic air emissions; solid waste management units; and certification. Sixteen appendices contain such items as maps, waste analysesmore » and forms, inspection logs, equipment identification, etc.« less

  13. School closures during the 2009 influenza pandemic: national and local experiences

    PubMed Central

    2014-01-01

    Background School closure is a non-pharmaceutical intervention that was considered in many national pandemic plans developed prior to the start of the influenza A(H1N1)pdm09 pandemic, and received considerable attention during the event. Here, we retrospectively review and compare national and local experiences with school closures in several countries during the A(H1N1)pdm09 pandemic. Our intention is not to make a systematic review of country experiences; rather, it is to present the diversity of school closure experiences and provide examples from national and local perspectives. Methods Data were gathered during and following a meeting, organized by the European Centres for Disease Control, on school closures held in October 2010 in Stockholm, Sweden. A standard data collection form was developed and sent to all participants. The twelve participating countries and administrative regions (Bulgaria, China, France, Hong Kong Special Administrative Region (SAR), Italy, Japan, New Zealand, Serbia, South Africa, Thailand, United Kingdom, and United States) provided data. Results Our review highlights the very diverse national and local experiences on school closures during the A(H1N1)pdm09 pandemic. The processes including who was in charge of making recommendations and who was in charge of making the decision to close, the school-based control strategies, the extent of school closures, the public health tradition of responses and expectations on school closure varied greatly between countries. Our review also discusses the many challenges associated with the implementation of this intervention and makes recommendations for further practical work in this area. Conclusions The single most important factor to explain differences observed between countries may have been the different public health practises and public expectations concerning school closures and influenza in the selected countries. PMID:24739814

  14. Kyrgyzstan’s Closure of the Manas Airbase: Context and Implications

    DTIC Science & Technology

    2009-05-04

    agreement with the United States, after the United States had criticized the Uzbek government for repressive actions against civilians. Some of the...Zealand, Norway, Poland , South Korea, Spain, and Turkey. Among the few legislators who opposed closing the airbase, Bakyt Beshimov, the leader of the...With Secretary of Defense Robert Gates, Krakow, Poland , February 20, 2009. 24 Saban Kardas “Will the Closure of Manas Airbase Strengthen U.S

  15. 4-inch sample recovery canisters, Test Model D series. Final report, September 1969--May 1970

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goode, P.L.; Neff, G.W.

    1970-12-31

    Six tests were conducted on 4-Inch Test Model D Closures to develop an improved closure for the redesigned Sandia Recovery Canister (SRC). The first three closures tested used variations of the high explosive (HE) design used on the previous Model B (Second) Series (P64283). The last three units tested used variations of the HE design used in the Midi Mist Event SRC.

  16. Mechanical roles of apical constriction, cell elongation, and cell migration during neural tube formation in Xenopus.

    PubMed

    Inoue, Yasuhiro; Suzuki, Makoto; Watanabe, Tadashi; Yasue, Naoko; Tateo, Itsuki; Adachi, Taiji; Ueno, Naoto

    2016-12-01

    Neural tube closure is an important and necessary process during the development of the central nervous system. The formation of the neural tube structure from a flat sheet of neural epithelium requires several cell morphogenetic events and tissue dynamics to account for the mechanics of tissue deformation. Cell elongation changes cuboidal cells into columnar cells, and apical constriction then causes them to adopt apically narrow, wedge-like shapes. In addition, the neural plate in Xenopus is stratified, and the non-neural cells in the deep layer (deep cells) pull the overlying superficial cells, eventually bringing the two layers of cells to the midline. Thus, neural tube closure appears to be a complex event in which these three physical events are considered to play key mechanical roles. To test whether these three physical events are mechanically sufficient to drive neural tube formation, we employed a three-dimensional vertex model and used it to simulate the process of neural tube closure. The results suggest that apical constriction cued the bending of the neural plate by pursing the circumference of the apical surface of the neural cells. Neural cell elongation in concert with apical constriction further narrowed the apical surface of the cells and drove the rapid folding of the neural plate, but was insufficient for complete neural tube closure. Migration of the deep cells provided the additional tissue deformation necessary for closure. To validate the model, apical constriction and cell elongation were inhibited in Xenopus laevis embryos. The resulting cell and tissue shapes resembled the corresponding simulation results.

  17. Closure Report for Corrective Action Unit 536: Area 3 Release Site, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 536 is located in Area 3 of the Nevada Test Site. CAU 536 is listed in the Federal Facility Agreement and Consent Order of 1996 as Area 3 Release Site, and comprises a single Corrective Action Site (CAS): {sm_bullet} CAS 03-44-02, Steam Jenny Discharge The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CAS 03-44-02 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)- and polyaromatic hydrocarbon (PAH)-impacted soil, soil impacted with plutonium (Pu)-239, and concrete pad debris. CAU 536 was closed in accordance with the NDEP-approved CAU 536more » Corrective Action Plan (CAP), with minor deviations as approved by NDEP. The closure activities specified in the CAP were based on the recommendations presented in the CAU 536 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 536 closure activities. During closure activities, approximately 1,000 cubic yards (yd3) of hydrocarbon waste in the form of TPH- and PAH-impacted soil and debris, approximately 8 yd3 of Pu-239-impacted soil, and approximately 100 yd3 of concrete debris were generated, managed, and disposed of appropriately. Additionally, a previously uncharacterized, buried drum was excavated, removed, and disposed of as hydrocarbon waste as a best management practice. Waste minimization techniques, such as the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure« less

  18. Closure and Post-Closure Care Requirements for Hazardous Waste Treatment, Storage and Disposal Facilities

    EPA Pesticide Factsheets

    When a hazardous waste management unit stops receiving waste at the end of its active life, it must be cleaned up, closed, monitored, and maintained in accordance with the Resource Conservation and Recovery Ac

  19. 75 FR 17618 - Fisheries of the Northeastern United States; Black Sea Bass Recreational Fishery; Emergency Rule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    .... The initial closure was highly controversial and a great deal of negative reaction was received... the initial 180-day closure appear in the plaintiff's motion for relief and, as such, NMFS will...

  20. Choice in maternity care: associations with unit supply, geographic accessibility and user characteristics

    PubMed Central

    2012-01-01

    Background Despite national policies to promote user choice for health services in many European countries, current trends in maternity unit closures create a context in which user choice may be reduced, not expanded. Little attention has been paid to the potential impact of closures on pregnant women’s choice of maternity unit. We study here how pregnant women’s choices interact with the distance they must travel to give birth, individual socioeconomic characteristics and the supply of maternity units in France in 2003. Results Overall, about one-third of women chose their maternity units based on proximity. This proportion increased steeply as supply was constrained. Greater distances between the first and second closest maternity unit were strongly associated with increasing preferences for proximity; when these distances were ≥ 30 km, over 85% of women selected the closest unit (revealed preference) and over 70% reported that proximity was the reason for their choice (expressed preference). Women living at a short distance to the closest maternity unit appeared to be more sensitive to increases in distance between their first and second closest available maternity units. The preference for proximity, expressed and revealed, was related to demographic and social characteristics: women from households in the manual worker class chose a maternity unit based on its proximity more often and also went to the nearest unit when compared with women from professional and managerial households. These sociodemographic associations held true after adjusting for supply factors, maternal age and socioeconomic status. Conclusions Choice seems to be arbitrated in both absolute and relative terms. Taking changes in supply into consideration and how these affect choice is an important element for assessing the real impact of maternity unit closures on pregnant women’s experiences. An indicator measuring the proportion of women for whom the distance between the first and second maternity unit is greater than 30 km can provide a simple measure of choice to complement indicators of geographic accessibility in evaluations of the impact of maternity unit closures. PMID:22905951

  1. Overview of two story walkup flat type unit illustrating projecting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Overview of two story walk-up flat type unit illustrating projecting balconies and concrete stairways. Original pipe railings replaced by square tube railing. Building 26, view facing east - Harbor Hills Housing Project, Two Story Walk-Up Type, 26607 Western Avenue, Lomita, Los Angeles County, CA

  2. Closure Report for Corrective Action Unit 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  3. Tonopah Test Range Post-Closure Inspection Annual Report, Tonopah Test Range, Nevada, Calendar Year 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    This post-closure inspection report provides documentation of the semiannual inspection activities, maintenance and repair activities, and conclusions and recommendations for calendar year 2003 for eight corrective action units located on the Tonopah Test Range, Nevada.

  4. 36 CFR 13.50 - Closure procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 13.50 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA General Provisions § 13.50 Closure procedures. (a) Authority. The... cultural or scientific values, subsistence uses, endangered or threatened species conservation, and other...

  5. 50 CFR 648.101 - Closures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Summer...) EEZ closure. The Regional Administrator shall close the EEZ to fishing for summer flounder by... notifying vessel and dealer permit holders that no commercial quota is available for landing summer flounder...

  6. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-08-31

    This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for closure of Corrective Action Unit (CAU) 574, Neptune. CAU 574 is included in the Federal Facility Agreement and Consent Order (FFACO) (1996 [as amended March 2010]) and consists of the following two Corrective Action Sites (CASs) located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); (2) CAS 12-45-01, U12e.05 Crater (Blanca). This plan provides the methodology for the field activities that will be performed to gather the necessary information for closure of the two CASs. There is sufficient information andmore » process knowledge regarding the expected nature and extent of potential contaminants to recommend closure of CAU 574 using the SAFER process. Based on historical documentation, personnel interviews, site process knowledge, site visits, photographs, field screening, analytical results, the results of the data quality objective (DQO) process (Section 3.0), and an evaluation of corrective action alternatives (Appendix B), closure in place with administrative controls is the expected closure strategy for CAU 574. Additional information will be obtained by conducting a field investigation to verify and support the expected closure strategy and provide a defensible recommendation that no further corrective action is necessary. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval.« less

  7. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives includedmore » No Further Action and Clean Closure.« less

  8. Closure Report for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR) Tonopah Test Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less

  9. Hanford facility dangerous waste permit application, general information portion. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sonnichsen, J.C.

    1997-08-21

    For purposes of the Hanford facility dangerous waste permit application, the US Department of Energy`s contractors are identified as ``co-operators`` and sign in that capacity (refer to Condition I.A.2. of the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit). Any identification of these contractors as an ``operator`` elsewhere in the application is not meant to conflict with the contractors` designation as co-operators but rather is based on the contractors` contractual status with the U.S. Department of Energy, Richland Operations Office. The Dangerous Waste Portion of the initial Hanford Facility Resource Conservation and Recovery Act Permit,more » which incorporated five treatment, storage, and/or disposal units, was based on information submitted in the Hanford Facility Dangerous Waste Permit Application and in closure plan and closure/postclosure plan documentation. During 1995, the Dangerous Waste Portion was modified twice to incorporate another eight treatment, storage, and/or disposal units; during 1996, the Dangerous Waste Portion was modified once to incorporate another five treatment, storage, and/or disposal units. The permit modification process will be used at least annually to incorporate additional treatment, storage, and/or disposal units as permitting documentation for these units is finalized. The units to be included in annual modifications are specified in a schedule contained in the Dangerous Waste Portion of the Hanford Facility Resource Conservation and Recovery Act Permit. Treatment, storage, and/or disposal units will remain in interim status until incorporated into the Permit. The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to individual operating treatment, storage, and/or disposal units for which Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).« less

  10. Magnetotelluric Data, Central Yucca Flat, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T.H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for Central Yucca Flat, Profile 1, as shown in figure 1. No interpretation of the data is included here.« less

  11. Magnetotelluric Data, North Central Yucca Flat, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T.H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for north central Yucca Flat, Profile 7, as shown in Figure 1. No interpretation of the data is included here.« less

  12. Magnetotelluric Data, Northern Frenchman Flat, Nevada Test Site Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T. H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for Frenchman Flat Profile 3, as shown in Figure 1. No interpretation of the data is included here.« less

  13. Magnetotelluric Data, Southern Yucca Flat, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T.H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for Southern Yucca Flat, Profile 4, as shown in Figure 1. No interpretation of the data is included here.« less

  14. Magnetotelluric Data, Northern Yucca Flat, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T.H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT sounding data for Profile 2, (fig. 1), located in the northern Yucca Flat area. No interpretation of the data is included here.« less

  15. Closure Report for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2012-08-15

    This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 562, Waste Systems, and provides documentation supporting the completed corrective actions and confirmation that closure objectives for CAU 562 were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 as amended). CAU 562 consists of the following 13 Corrective Action Sites (CASs), located in Areas 2, 23, and 25 of the Nevadamore » National Security Site: · CAS 02-26-11, Lead Shot · CAS 02-44-02, Paint Spills and French Drain · CAS 02-59-01, Septic System · CAS 02-60-01, Concrete Drain · CAS 02-60-02, French Drain · CAS 02-60-03, Steam Cleaning Drain · CAS 02-60-04, French Drain · CAS 02-60-05, French Drain · CAS 02-60-06, French Drain · CAS 02-60-07, French Drain · CAS 23-60-01, Mud Trap Drain and Outfall · CAS 23-99-06, Grease Trap · CAS 25-60-04, Building 3123 Outfalls Closure activities began in October 2011 and were completed in April 2012. Activities were conducted according to the Corrective Action Plan for CAU 562 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The corrective actions included No Further Action and Clean Closure. Closure activities generated sanitary waste and hazardous waste. Some wastes exceeded land disposal limits and required offsite treatment prior to disposal. Other wastes met land disposal restrictions and were disposed in appropriate onsite or offsite landfills. NNSA/NSO requests the following: · A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 562 · The transfer of CAU 562 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  16. Flat bands in fractal-like geometry

    NASA Astrophysics Data System (ADS)

    Pal, Biplab; Saha, Kush

    2018-05-01

    We report the presence of multiple flat bands in a class of two-dimensional lattices formed by Sierpinski gasket (SPG) fractal geometries as the basic unit cells. Solving the tight-binding Hamiltonian for such lattices with different generations of a SPG network, we find multiple degenerate and nondegenerate completely flat bands, depending on the configuration of parameters of the Hamiltonian. Moreover, we establish a generic formula to determine the number of such bands as a function of the generation index ℓ of the fractal geometry. We show that the flat bands and their neighboring dispersive bands have remarkable features, the most interesting one being the spin-1 conical-type spectrum at the band center without any staggered magnetic flux, in contrast to the kagome lattice. We furthermore investigate the effect of magnetic flux in these lattice settings and show that different combinations of fluxes through such fractal unit cells lead to a richer spectrum with a single isolated flat band or gapless electron- or holelike flat bands. Finally, we discuss a possible experimental setup to engineer such a fractal flat-band network using single-mode laser-induced photonic waveguides.

  17. New edge-centered photonic square lattices with flat bands

    NASA Astrophysics Data System (ADS)

    Zhang, Da; Zhang, Yiqi; Zhong, Hua; Li, Changbiao; Zhang, Zhaoyang; Zhang, Yanpeng; Belić, Milivoj R.

    2017-07-01

    We report a new class of edge-centered photonic square lattices with multiple flat bands, and consider in detail two examples: the Lieb-5 and Lieb-7 lattices. In these lattices, there are 5 and 7 sites in the unit cell and in general, the number is restricted to odd integers. The number of flat bands m in the new Lieb lattices is related to the number of sites N in the unit cell by a simple formula m =(N - 1) / 2. The flat bands reported here are independent of the pseudomagnetic field. The properties of lattices with even and odd number of flat bands are different. We consider the localization of light in such Lieb lattices. If the input beam excites the flat-band mode, it will not diffract during propagation, owing to the strong mode localization. In the Lieb-7 lattice, the beam will also oscillate during propagation and still not diffract. The period of oscillation is determined by the energy difference between the two flat bands. This study provides a new platform for investigating light trapping, photonic topological insulators, and pseudospin-mediated vortex generation.

  18. 40 CFR 264.603 - Post-closure care.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Post-closure care. 264.603 Section 264.603 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... treatment or storage unit has contaminated soils or ground water that cannot be completely removed or...

  19. THE U.S. EPA'S VISION FOR A BEACH FORECASTING TOOL

    EPA Science Inventory

    Beach closures due to water quality that exceeds standard limits occur frequently in the United States. These beach closures deprive the public of opportunities for recreational activities and can have a significant impact on local economics. Because of the large number of mari...

  20. The macroeconomic impact of pandemic influenza: estimates from models of the United Kingdom, France, Belgium and The Netherlands.

    PubMed

    Keogh-Brown, Marcus Richard; Smith, Richard D; Edmunds, John W; Beutels, Philippe

    2010-12-01

    The 2003 outbreak of severe acute respiratory syndrome (SARS) showed that infectious disease outbreaks can have notable macroeconomic impacts. The current H1N1 and potential H5N1 flu pandemics could have a much greater impact. Using a multi-sector single country computable general equilibrium model of the United Kingdom, France, Belgium and The Netherlands, together with disease scenarios of varying severity, we examine the potential economic cost of a modern pandemic. Policies of school closure, vaccination and antivirals, together with prophylactic absence from work are evaluated and their cost impacts are estimated. Results suggest GDP losses from the disease of approximately 0.5-2% but school closure and prophylactic absenteeism more than triples these effects. Increasing school closures from 4 weeks at the peak to entire pandemic closure almost doubles the economic cost, but antivirals and vaccinations seem worthwhile. Careful planning is therefore important to ensure expensive policies to mitigate the pandemic are effective in minimising illness and deaths.

  1. Post-Closure Monitoring Report for Corrective Action Unit 339: Area 12 Fleet Operations Steam Cleaning Effluent Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. B. Campbell

    2002-09-01

    The Area 12 Fleet Operations Steam Cleaning Effluent site is located in the southeastern portion of the Area 12 Camp at the Nevada Test Site. This site is identified in the Federal Facility Agreement and Consent Order (1996) as Corrective Action Site (CAS) 12-19-01 and is the only CAS assigned to Corrective Action Unit (CAU) 339. Post-closure sampling and inspection of the site were completed on March 27, 2002. Post-closure monitoring activities were scheduled biennially (every two years) in the Post-Closure Monitoring Plan provided in the Closure Report for CAU 339: Area 12 Fleet Operations Steam Cleaning Effluent, Nevada Testmore » Site (U.S. Department of Energy, Nevada Operations Office [DOEN], 1997). A baseline for the site was established by sampling in 1997. Based on the recommendations from the 1999 post-closure monitoring report (DOE/NV, 1999), samples were collected in 2000, earlier than originally proposed, because the 1999 sample results did not provide the expected decrease in total petroleum hydrocarbon (TPH) concentrations at the site. Sampling results from 2000 (DOE/NV, 2000) and 2001 (DOE/NV, 2001) revealed favorable conditions for natural degradation at the CAU 339 site, but because of differing sample methods and heterogeneity of the soil, data results from 2000 and later were not directly correlated with previous results. Post-closure monitoring activities for 2002 consisted of the following: (1) Soil sample collection from three undisturbed plots (Plots A, B, and C, Figure 2). (2) Sample analysis for TPH as oil and bio-characterization parameters (Comparative Enumeration Assay [CEA] and Standard Nutrient Panel [SNP]). (3) Site inspection to evaluate the condition of the fencing and signs. (4) Preparation and submittal of the Post-Closure Monitoring Report.« less

  2. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada for fiscal year 2013 (October 2012 - September 2013)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2014-01-31

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and, CAU 112, Area 23 Hazardous Waste Trenches.

  3. Tactical Sensors for Dispersed TNF (Tactical Nuclear Force) Units. Appendix 1.Tactical Sensory Survey.

    DTIC Science & Technology

    1983-06-30

    activating a separate transmitter, audible alarm, or contact closure. This sensor is compatible with any device that utilizes an input pulse or...transmitter, audible alarm, or contact closure. This sensor is compatible *i with any device that utilizes an output to produce an alarm. 110-4769-002. This...used to generate an alarm by activating a separate transmitter, audible alarm, or contact closure. This sensor is compatible with any device that

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs weremore » selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.« less

  5. 50 CFR 648.22 - Closure of the fishery.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Closure of the fishery. 648.22 Section 648.22 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the...

  6. 36 CFR 13.1242 - BCDA closures and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false BCDA closures and restrictions. 13.1242 Section 13.1242 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Katmai National Park and...

  7. California Emergency Department Closures Are Associated With Increased Inpatient Mortality At Nearby Hospitals

    PubMed Central

    Liu, Charles; Srebotnjak, Tanja; Hsia, Renee Y.

    2014-01-01

    Between 1996 and 2009 the annual number of emergency department (ED) visits in the United States increased by 51 percent while the number of EDs nationwide decreased by 6 percent, which placed unprecedented strain on the nation’s EDs. To investigate the effects of an ED closing on surrounding communities, we identified all ED closures in California during the period 1999–2010 and examined their association with inpatient mortality rates at nearby hospitals. We found that 24.9 percent of hospital admissions in this period occurred near an ED closure, and that these admissions had 5 percent higher odds of inpatient mortality than admissions not occurring near a closure. This association persisted whether we considered ED closures as affecting all future nearby admissions or only those occurring in the subsequent two years. These results suggest that ED closures have ripple effects on patient outcomes that should be considered when health systems and policy makers decide how to regulate ED closures. PMID:25092832

  8. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    NASA Astrophysics Data System (ADS)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  9. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Public participation and closure procedures. 36.42 Section 36.42 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF... community post offices within the vicinity affected, made available for broadcast on local radio stations in...

  10. 50 CFR 36.42 - Public participation and closure procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Public participation and closure procedures. 36.42 Section 36.42 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF... community post offices within the vicinity affected, made available for broadcast on local radio stations in...

  11. 40 CFR 264.119 - Post-closure notices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 264.119 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... required by §§ 264.116 and 264.119(a) have been filed with the local zoning authority or the authority with...

  12. 40 CFR 264.119 - Post-closure notices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 264.119 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED... closure of each hazardous waste disposal unit, the owner or operator must submit to the local zoning... required by §§ 264.116 and 264.119(a) have been filed with the local zoning authority or the authority with...

  13. 36 CFR 13.1910 - KNHL and developed area closures and restrictions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false KNHL and developed area closures and restrictions. 13.1910 Section 13.1910 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Wrangell-St...

  14. 40 CFR 258.71 - Financial assurance for closure.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....71 Section 258.71 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... closure. (a) The owner or operator must have a detailed written estimate, in current dollars, of the cost.... (1) The cost estimate must equal the cost of closing the largest area of all MSWLF unit ever...

  15. 40 CFR 258.71 - Financial assurance for closure.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....71 Section 258.71 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... closure. (a) The owner or operator must have a detailed written estimate, in current dollars, of the cost.... (1) The cost estimate must equal the cost of closing the largest area of all MSWLF unit ever...

  16. 36 CFR 13.1328 - EGDA closures and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false EGDA closures and restrictions. 13.1328 Section 13.1328 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Kenai Fjords National Park Exit...

  17. 36 CFR 13.1120 - Bartlett Cove Developed Area closures and restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Bartlett Cove Developed Area closures and restrictions. 13.1120 Section 13.1120 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay...

  18. 36 CFR 13.1120 - Bartlett Cove Developed Area closures and restrictions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Bartlett Cove Developed Area closures and restrictions. 13.1120 Section 13.1120 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay...

  19. Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTC-1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Kauss

    2011-06-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less

  20. Current Closure in the Auroral Ionosphere: Results from the Auroral Current and Electrodynamics Structure Rocket Mission

    NASA Technical Reports Server (NTRS)

    Kaeppler, S. R.; Kletzing, C. A.; Bounds, S. R.; Gjerloev, J. W.; Anderson, B. J.; Korth, H.; LaBelle, J. W.; Dombrowski, M. P.; Lessard, M.; Pfaff, R. F.; hide

    2012-01-01

    The Auroral Current and Electrodynamics Structure (ACES) mission consisted of two sounding rockets launched nearly simultaneously from Poker Flat Research Range, AK on January 29, 2009 into a dynamic multiple-arc aurora. The ACES rocket mission was designed to observe electrodynamic and plasma parameters above and within the current closure region of the auroral ionosphere. Two well instrumented payloads were flown along very similar magnetic field footprints, at different altitudes, with small temporal separation between both payloads. The higher altitude payload (apogee 360 km), obtained in-situ measurements of electrodynamic and plasma parameters above the current closure region to determine the input signature. The low altitude payload (apogee 130 km), made similar observations within the current closure region. Results are presented comparing observations of the electric fields, magnetic components, and the differential electron energy flux at magnetic footpoints common to both payloads. In situ data is compared to the ground based all-sky imager data, which presents the evolution of the auroral event as the payloads traversed through magnetically similar regions. Current measurements derived from the magnetometers on the high altitude payload observed upward and downward field-aligned currents. The effect of collisions with the neutral atmosphere is investigated to determine if it is a significant mechanism to explain discrepancies in the low energy electron flux. The high altitude payload also observed time-dispersed arrivals in the electron flux and perturbations in the electric and magnetic field components, which are indicative of Alfven waves.

  1. Current Closure in the Auroral Ionosphere: Results from the Auroral Current and Electrodynamics Structure Rocket Mission

    NASA Technical Reports Server (NTRS)

    Kaeppler, S. R.; Kletzing, C. A.; Bounds, S. R.; Gjerloev, J. W.; Anderson, B. J.; Korth, H.; LaBelle, J. W.; Dombrowski, M. P.; Lessard, M.; Pfaff, R. F.; hide

    2011-01-01

    The Auroral Current and Electrodynamics Structure (ACES) mission consisted of two sounding rockets launched nearly simultaneously from Poker Flat Research Range, AK on January 29, 2009 into a dynamic multiple-arc aurora. The ACES rocket mission was designed to observe electrodynamic and plasma parameters above and within the current closure region of the auroral ionosphere. Two well instrumented payloads were flown along very similar magnetic field footprints, at different altitudes, with small temporal separation between both payloads. The higher altitude payload (apogee 360 km), obtained in-situ measurements of electrodynamic and plasma parameters above the current closure region to determine the input signature. The low altitude payload (apogee 130 km), made similar observations within the current closure region. Results are presented comparing observations of the electric fields, magnetic components, and the differential electron energy flux at magnetic footpoints common to both payloads. In situ data is compared to the ground based all-sky imager data, which presents the evolution of the auroral event as the payloads traversed through magnetically similar regions. Current measurements derived from the magnetometers on the high altitude payload observed upward and downward field-aligned currents. The effect of collisions with the neutral atmosphere is investigated to determine it is a significant mechanism to explain discrepancies in the low energy electron flux. The high altitude payload also observed time-dispersed arrivals in the electron flux and perturbations in the electric and magnetic field components, which are indicative of Alfven waves.

  2. Development of Numerical Extended Hydrodynamics for Transition-Regime Non-Equilibrium Flows Encountered in Semiconductor Manufacturing Processes

    NASA Technical Reports Server (NTRS)

    Groth, Clinton P. T.; Roe, Philip L.

    1998-01-01

    Six months of funding was received for the proposed three year research program (funding for the period from March 1, 1997 to August 31, 1997). Although the official starting date for the project was March 1, 1997, no funding for the project was received until July 1997. In the funded research period, considerable progress was made on Phase I of the proposed research program. The initial research efforts concentrated on applying the 10-, 20-, and 35-moment Gaussian-based closures to a series of standard two-dimensional non-reacting single species test flow problems, such as the flat plate, couette, channel, and rearward facing step flows, and to some other two-dimensional flows having geometries similar to those encountered in chemical-vapor deposition (CVD) reactors. Eigensystem analyses for these systems for the case of two spatial dimensions was carried out and efficient formulations of approximate Riemann solvers have been formulated using these eigenstructures. Formulations to include rotational non-equilibrium effects into the moment closure models for the treatment of polyatomic gases were explored, as the original formulations of the closure models were developed strictly for gases composed of monatomic molecules. The development of a software library and computer code for solving relaxing hyperbolic systems in two spatial dimensions of the type arising from the closure models was also initiated. The software makes use of high-resolution upwind finite-volumes schemes, multi-stage point implicit time stepping, and automatic adaptive mesh refinement (AMR) to solve the governing conservation equations for the moment closures. The initial phase of the code development was completed and a numerical investigation of the solutions of the 10-moment closure model for the simple two-dimensional test cases mentioned above was initiated. Predictions of the 10-moment model were compared to available theoretical solutions and the results of direct-simulation Monte Carlo (DSMC) calculations. The first results of this study were presented at a meeting last year.

  3. The urethral closure function in continent and stress urinary incontinent women assessed by urethral pressure reflectometry.

    PubMed

    Saaby, Marie-Louise

    2014-02-01

    Stress urinary incontinence (SUI) occurs when the bladder pressure exceeds the urethral pressure in connection with physical effort or exertion or when sneezing or coughing and depends both on the strength of the urethral closure function and the abdominal pressure to which it is subjected. The urethral closure function in continent women and the dysfunction causing SUI are not known in details. The currently accepted view is based on the concept of a sphincteric unit and a support system. Our incomplete knowledge relates to the complexity of the closure apparatus and to inadequate assessment methods which so far have not provided robust urodynamic diagnostic tools, severity measures, or parameters to assess outcome after intervention. Urethral Pressure Reflectometry (UPR) is a novel method that measures the urethral pressure and cross-sectional area (by use of sound waves) simultaneously. The technique involves insertion of only a small, light and flexible polyurethane bag in the urethra and therefore avoids the common artifacts encountered with conventional methods. The UPR parameters can be obtained at a specific site of the urethra, e.g. the high pressure zone, and during various circumstances, i.e. resting and squeezing. During the study period, we advanced the UPR technique to enable faster measurement (within 7 seconds by the continuous technique) which allowed assessment during increased intra-abdominal pressure induced by physical straining. We investigated the urethral closure function in continent and SUI women during resting and straining by the "fast" UPR technique. Thereby new promising urethral parameters were provided that allowed characterization of the closure function based on the permanent closure forces (primarily generated by the sphincteric unit, measured by the Po-rest) and the adjunctive closure forces (primarily generated by the support system, measured by the abdominal to urethral pressure impact ratio (APIR)). The new parameters enabled a more detailed description of the efficiency of the closure function and the extent and nature of a possible dysfunction in the individual woman. The urethral closure equation (UCE) and urethral opening pressure at an abdominal pressure of 50 cm H2O (Po-Abd 50), respectively, which combine the permanent and the adjunctive closure forces, could separate continent and SUI women and thus appear to be excellent diagnostic tests. Moreover, the parameters showed highly significant negative correlation with ICIQ-SF, pad test and the number of incontinence episodes per week and are therefore valid as urodynamic severity measures. UPR in SUI women before and after TVT demonstrated a more efficient urethral closure function after the operation. The Po-rest was unchanged suggesting that the sphincteric unit was virtually unaltered and hence the permanent closure forces unchanged. However, the resting opening elastance increased by 18% indicating that at the resting state the TVT somewhat improves the closure function by providing increased resistance against the dilation of the urethra, which probably explains the decreased maximum urine flow rate found after TVT in this and previous studies. The APIR increased in all patients after TVT suggesting that the support system was re-established and thus the adjunctive closure forces improved, regardless of the type of pre-operative dysfunction. The new UPR parameters may be used as outcome measures after treatment.

  4. 2013 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada; Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, Gregory

    2014-03-01

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less

  5. Dilatation-dissipation corrections for advanced turbulence models

    NASA Technical Reports Server (NTRS)

    Wilcox, David C.

    1992-01-01

    This paper analyzes dilatation-dissipation based compressibility corrections for advanced turbulence models. Numerical computations verify that the dilatation-dissipation corrections devised by Sarkar and Zeman greatly improve both the k-omega and k-epsilon model predicted effect of Mach number on spreading rate. However, computations with the k-gamma model also show that the Sarkar/Zeman terms cause an undesired reduction in skin friction for the compressible flat-plate boundary layer. A perturbation solution for the compressible wall layer shows that the Sarkar and Zeman terms reduce the effective von Karman constant in the law of the wall. This is the source of the inaccurate k-gamma model skin-friction predictions for the flat-plate boundary layer. The perturbation solution also shows that the k-epsilon model has an inherent flaw for compressible boundary layers that is not compensated for by the dilatation-dissipation corrections. A compressibility modification for k-gamma and k-epsilon models is proposed that is similar to those of Sarkar and Zeman. The new compressibility term permits accurate predictions for the compressible mixing layer, flat-plate boundary layer, and a shock separated flow with the same values for all closure coefficients.

  6. Physical analysis and second-order modelling of an unsteady turbulent flow - The oscillating boundary layer on a flat plate

    NASA Technical Reports Server (NTRS)

    Ha Minh, H.; Viegas, J. R.; Rubesin, M. W.; Spalart, P.; Vandromme, D. D.

    1989-01-01

    The turbulent boundary layer under a freestream whose velocity varies sinusoidally in time around a zero mean is computed using two second order turbulence closure models. The time or phase dependent behavior of the Reynolds stresses are analyzed and results are compared to those of a previous SPALART-BALDWIN direct simulation. Comparisons show that the second order modeling is quite satisfactory for almost all phase angles, except in the relaminarization period where the computations lead to a relatively high wall shear stress.

  7. Roles of Historical Photography in Waste Site Characterization, Closure, and Remediation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackey, H.

    1998-07-01

    Over 40,000 frames of vertical historical photography from 1938 to 1996 and over 10,000 frames of oblique photography from 1981 to 1991 of the 777-square kilometer Savannah River Site in south central South Carolina were reviewed, cataloged, and referenced utilizing ARCView and associated ArcInfo tools. This allows environmental reviews of over 400 potential waste units on the SRS to be conducted in a rapid fashion to support preparation of work plans, characterization, risk assessments, and closure of the waste units in a more cost effective manner.

  8. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions 'Catalyze' Broader Management?

    PubMed

    Oliver, Thomas A; Oleson, Kirsten L L; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village's fished area and lasted 2-7 months. Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure's reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management ("no ban", n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown ("ban", n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after "no ban" closures and modest increases after "ban" closures. Villages did not show a significant decline in income during closure events. Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers' time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management.

  9. 75 FR 79417 - Record of Vote of Meeting Closure

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ...] Record of Vote of Meeting Closure I, Isaac Fulwood, of the United States Parole Commission, was present... following Commissioners voted that the meeting be closed: Isaac Fulwood, Cranston J. Mitchell and Patricia K.... Isaac Fulwood, Chairman, U.S. Parole Commission. [FR Doc. 2010-31860 Filed 12-17-10; 8:45 am] BILLING...

  10. 50 CFR 36.16 - Closure to subsistence uses of fish and wildlife.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 9 2014-10-01 2014-10-01 false Closure to subsistence uses of fish and wildlife. 36.16 Section 36.16 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...

  11. 50 CFR 36.16 - Closure to subsistence uses of fish and wildlife.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 9 2012-10-01 2012-10-01 false Closure to subsistence uses of fish and wildlife. 36.16 Section 36.16 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...

  12. 50 CFR 36.16 - Closure to subsistence uses of fish and wildlife.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 9 2013-10-01 2013-10-01 false Closure to subsistence uses of fish and wildlife. 36.16 Section 36.16 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...

  13. 50 CFR 36.16 - Closure to subsistence uses of fish and wildlife.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Closure to subsistence uses of fish and wildlife. 36.16 Section 36.16 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...

  14. 50 CFR 36.16 - Closure to subsistence uses of fish and wildlife.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 8 2011-10-01 2011-10-01 false Closure to subsistence uses of fish and wildlife. 36.16 Section 36.16 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) THE NATIONAL WILDLIFE REFUGE SYSTEM ALASKA NATIONAL WILDLIFE REFUGES...

  15. 75 FR 32158 - New Pneumatic Off-the-Road Tires from the People's Republic of China: Extension of Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ..., 2010, Tianjin United Tire & Rubber International Co., Ltd. (``TUTRIC''), a mandatory respondent... deadlines by seven calendar days due to closure of federal government offices in February 2010 from a...: Tolling of Administrative Deadlines As A Result of the Government Closure During the Recent Snowstorm...

  16. 77 FR 73013 - Stainless Steel Plate in Coils From Belgium: Antidumping Duty Administrative Review, 2010-2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... Independent Organization, and the United Steel, Paper and Forestry, Rubber, Manufacturing, Energy, Allied... the closure of the Federal Government from October 29, through October 30, 2012. Thus, all deadlines... Government Closure during Hurricane Sandy,'' dated October 31, 2012. On October 22, 2012, the Department...

  17. 78 FR 45896 - Fisheries of the Northeastern United States; Northeast Multispecies Fishery; Trimester Closure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Fishery; Trimester Closure for the Common Pool Fishery AGENCY: National Marine Fisheries Service (NMFS... remainder of Trimester 1, through August 31, 2013. Based on our projection, the common pool fishery has... area for the remainder of the trimester. This action is intended to prevent an overage of the common...

  18. A Foot-Mounted Inertial Measurement Unit (IMU) Positioning Algorithm Based on Magnetic Constraint

    PubMed Central

    Zou, Jiaheng

    2018-01-01

    With the development of related applications, indoor positioning techniques have been more and more widely developed. Based on Wi-Fi, Bluetooth low energy (BLE) and geomagnetism, indoor positioning techniques often rely on the physical location of fingerprint information. The focus and difficulty of establishing the fingerprint database are in obtaining a relatively accurate physical location with as little given information as possible. This paper presents a foot-mounted inertial measurement unit (IMU) positioning algorithm under the loop closure constraint based on magnetic information. It can provide relatively reliable position information without maps and geomagnetic information and provides a relatively accurate coordinate for the collection of a fingerprint database. In the experiment, the features extracted by the multi-level Fourier transform method proposed in this paper are validated and the validity of loop closure matching is tested with a RANSAC-based method. Moreover, the loop closure detection results show that the cumulative error of the trajectory processed by the graph optimization algorithm is significantly suppressed, presenting a good accuracy. The average error of the trajectory under loop closure constraint is controlled below 2.15 m. PMID:29494542

  19. A Foot-Mounted Inertial Measurement Unit (IMU) Positioning Algorithm Based on Magnetic Constraint.

    PubMed

    Wang, Yan; Li, Xin; Zou, Jiaheng

    2018-03-01

    With the development of related applications, indoor positioning techniques have been more and more widely developed. Based on Wi-Fi, Bluetooth low energy (BLE) and geomagnetism, indoor positioning techniques often rely on the physical location of fingerprint information. The focus and difficulty of establishing the fingerprint database are in obtaining a relatively accurate physical location with as little given information as possible. This paper presents a foot-mounted inertial measurement unit (IMU) positioning algorithm under the loop closure constraint based on magnetic information. It can provide relatively reliable position information without maps and geomagnetic information and provides a relatively accurate coordinate for the collection of a fingerprint database. In the experiment, the features extracted by the multi-level Fourier transform method proposed in this paper are validated and the validity of loop closure matching is tested with a RANSAC-based method. Moreover, the loop closure detection results show that the cumulative error of the trajectory processed by the graph optimization algorithm is significantly suppressed, presenting a good accuracy. The average error of the trajectory under loop closure constraint is controlled below 2.15 m.

  20. Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2011-02-24

    This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

  1. New Models for Velocity/Pressure-Gradient Correlations in Turbulent Boundary Layers

    NASA Astrophysics Data System (ADS)

    Poroseva, Svetlana; Murman, Scott

    2014-11-01

    To improve the performance of Reynolds-Averaged Navier-Stokes (RANS) turbulence models, one has to improve the accuracy of models for three physical processes: turbulent diffusion, interaction of turbulent pressure and velocity fluctuation fields, and dissipative processes. The accuracy of modeling the turbulent diffusion depends on the order of a statistical closure chosen as a basis for a RANS model. When the Gram-Charlier series expansions for the velocity correlations are used to close the set of RANS equations, no assumption on Gaussian turbulence is invoked and no unknown model coefficients are introduced into the modeled equations. In such a way, this closure procedure reduces the modeling uncertainty of fourth-order RANS (FORANS) closures. Experimental and direct numerical simulation data confirmed the validity of using the Gram-Charlier series expansions in various flows including boundary layers. We will address modeling the velocity/pressure-gradient correlations. New linear models will be introduced for the second- and higher-order correlations applicable to two-dimensional incompressible wall-bounded flows. Results of models' validation with DNS data in a channel flow and in a zero-pressure gradient boundary layer over a flat plate will be demonstrated. A part of the material is based upon work supported by NASA under award NNX12AJ61A.

  2. RANS simulations of wind turbine wakes: optimal tuning of turbulence closure and aerodynamic loads from LiDAR and SCADA data

    NASA Astrophysics Data System (ADS)

    Letizia, Stefano; Puccioni, Matteo; Zhan, Lu; Viola, Francesco; Camarri, Simone; Iungo, Giacomo Valerio

    2017-11-01

    Numerical simulations of wakes produced by utility-scale wind turbines still present challenges related to the variability of the atmospheric conditions and, in the most of the cases, the lack of information about the geometry and aerodynamic performance of the wind turbine blades. In order to overcome the mentioned difficulties, we propose a RANS solver for which turbine aerodynamic forcing and turbulence closure are calibrated through LiDAR and SCADA data acquired for an onshore wind farm. The wind farm under examination is located in North Texas over a relatively flat terrain. The experimental data are leveraged to maximize accuracy of the RANS predictions in terms of wake velocity field and power capture for different atmospheric stability conditions and settings of the wind turbines. The optimization of the RANS parameters is performed through an adjoint-RANS formulation and a gradient-based procedure. The optimally-tuned aerodynamic forcing and turbulence closure are then analyzed in order to investigate effects of the atmospheric stability on the evolution of wind turbine wakes and power performance. The proposed RANS solver has low computational costs comparable to those of wake engineering models, which make it a compelling tool for wind farm control and optimization. Acknowledgments: NSF I/UCRC WindSTAR IIP 1362033 and TACC.

  3. Factors associated with increasing nursing home closures.

    PubMed

    Castle, Nicholas G; Engberg, John; Lave, Judith; Fisher, Andrew

    2009-06-01

    We determine the rate of nursing home closures for 7 years (1999-2005) and examine internal (e.g., quality), organizational (e.g., chain membership), and external (e.g., competition) factors associated with these closures. The names of the closed facilities and dates of closure from state regulators in all 50 states were obtained. This information was linked to the Online Survey, Certification, and Reporting data, which contains information on internal, organizational, and market factors for almost all nursing homes in the United States. One thousand seven hundred and eighty-nine facilities closed over this time period (1999-2005). The average annual rate of closure was about 2 percent of facilities, but the rate of closure was found to be increasing. Nursing homes with higher rates of deficiency citations, hospital-based facilities, chain members, small bed size, and facilities located in markets with high levels of competition were more likely to close. High Medicaid occupancy rates were associated with a high likelihood of closure, especially for facilities with low Medicaid reimbursement rates. As states actively debate about how to redistribute long-term care services/dollars, our findings show that they should be cognizant of the potential these decisions have for facilitating nursing home closures.

  4. Closure Report for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    Corrective Action Unit (CAU) 139 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Waste Disposal Sites' and consists of the following seven Corrective Action Sites (CASs), located in Areas 3, 4, 6, and 9 of the Nevada Test Site: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Closure activities were conducted from December 2008 to April 2009 according to the FFACO (1996, as amended February 2008) andmore » the Corrective Action Plan for CAU 139 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. Closure activities are summarized. CAU 139, 'Waste Disposal Sites,' consists of seven CASs in Areas 3, 4, 6, and 9 of the NTS. The closure alternatives included No Further Action, Clean Closure, and Closure in Place with Administrative Controls. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 139 as documented in this CR: (1) At CAS 03-35-01, Burn Pit, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (2) At CAS 04-08-02, Waste Disposal Site, an administrative UR was implemented. No postings or post-closure monitoring are required. (3) At CAS 04-99-01, Contaminated Surface Debris, soil and debris were removed and disposed as LLW, and debris was removed and disposed as sanitary waste. (4) At CAS 06-19-02, Waste Disposal Site/Burn Pit, no work was performed. (5) At CAS 06-19-03, Waste Disposal Trenches, a native soil cover was installed, and a UR was implemented. (6) At CAS 09-23-01, Area 9 Gravel Gertie, a UR was implemented. (7) At CAS 09-34-01, Underground Detection Station, no work was performed.« less

  5. Left Atrial Appendage Closure for Stroke Prevention: Devices, Techniques, and Efficacy.

    PubMed

    Iskandar, Sandia; Vacek, James; Lavu, Madhav; Lakkireddy, Dhanunjaya

    2016-05-01

    Left atrial appendage closure can be performed either surgically or percutaneously. Surgical approaches include direct suture, excision and suture, stapling, and clipping. Percutaneous approaches include endocardial, epicardial, and hybrid endocardial-epicardial techniques. Left atrial appendage anatomy is highly variable and complex; therefore, preprocedural imaging is crucial to determine device selection and sizing, which contribute to procedural success and reduction of complications. Currently, the WATCHMAN is the only device that is approved for left atrial appendage closure in the United States. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. Volcanotectonic history of Crater Flat, southwestern Nevada, as suggested by new evidence from drill hole USW-VH-1 and vicinity

    USGS Publications Warehouse

    Carr, W.J.

    1982-01-01

    New evidence for a possible resurgent dome in the caldera related to eruption of the Bullfrog Member of the Crater Flat Tuff has been provided by recent drilling of a 762-meter (2,501-foot) hole in central Crater Flat. Although no new volcanic units were penetrated by the drill hole (USW-VH-1), the positive aeromagnetic anomaly in the vicinity of the drill hole appears to result in part from the unusually thick, densely welded tuff of the Bullfrog. Major units penetrated include alluvium, basalt of Crater Flat, Tiva Canyon and Topopah Spring Members of the Paintbrush Tuff, and Prow Pass and Bullfrog Members of the Crater Flat Tuff. In addition, the drill hole provided the first subsurface hydrologic information for the area. The water table in the hole is at about 180 meters (600 feet), and the temperature gradient appears slightly higher than normal for the region.

  7. Association of land use and beach closure in the United ...

    EPA Pesticide Factsheets

    Swimming in natural waters (e.g., oceans, lakes, rivers) is one of most popular recreational activities in the United States. However, exposure to pathogens (e.g., Salmonella spp., Shigella spp., Cryptosporidium, Giardia, adenovirus, norovirus) in recreational waters can lead to a variety of adverse health outcomes. To protect public health and reduce the number of outbreaks associated with recreational waters, the BEACH Act was passed in 2000, which required beach regulators to develop a formal plan to assess beach water quality and to notify the public if recreational waters are unsafe. High levels of microorganisms in water often follow extreme weather events. Besides extreme weather events, the proximity of certain land uses to beaches may also have great influence on beach water quality. Microbial contaminants that lead to beach closures and human illness come mainly from land, either from discrete point sources or from diffuse non-point sources. It is expected that land use will have considerable influence on beach microbial water quality. However, to date, studies on impacts of land use on beach microbial contamination are rare, and few researchers are aware of the relationship between land use and beach closures.In this study, we analyzed beach closure data obtained from 2004 to 2013 for more than 500 beaches in the United States, and examined their associations with land use around beaches in 2006 and 2011. The results show that the number of beach clos

  8. A Hydrostratigraphic Model and Alternatives for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 97: Yucca Flat-Climax Mine, Lincoln and Nye Counties, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geotechnical Sciences Group Bechtel Nevada

    2006-01-01

    A new three-dimensional hydrostratigraphic framework model for the Yucca Flat-Climax Mine Corrective Action Unit was completed in 2005. The model area includes Yucca Flat and Climax Mine, former nuclear testing areas at the Nevada Test Site, and proximal areas. The model area is approximately 1,250 square kilometers in size and is geologically complex. Yucca Flat is a topographically closed basin typical of many valleys in the Basin and Range province. Faulted and tilted blocks of Tertiary-age volcanic rocks and underlying Proterozoic and Paleozoic sedimentary rocks form low ranges around the structural basin. During the Cretaceous Period a granitic intrusive wasmore » emplaced at the north end of Yucca Flat. A diverse set of geological and geophysical data collected over the past 50 years was used to develop a structural model and hydrostratigraphic system for the basin. These were integrated using EarthVision? software to develop the 3-dimensional hydrostratigraphic framework model. Fifty-six stratigraphic units in the model area were grouped into 25 hydrostratigraphic units based on each unit's propensity toward aquifer or aquitard characteristics. The authors organized the alluvial section into 3 hydrostratigraphic units including 2 aquifers and 1 confining unit. The volcanic units in the model area are organized into 13 hydrostratigraphic units that include 8 aquifers and 5 confining units. The underlying pre-Tertiary rocks are divided into 7 hydrostratigraphic units, including 3 aquifers and 4 confining units. Other units include 1 Tertiary-age sedimentary confining unit and 1 Mesozoic-age granitic confining unit. The model depicts the thickness, extent, and geometric relationships of these hydrostratigraphic units (''layers'' in the model) along with the major structural features (i.e., faults). The model incorporates 178 high-angle normal faults of Tertiary age and 2 low-angle thrust faults of Mesozoic age. The complexity of the model area and the non-uniqueness of some of the interpretations incorporated into the base model made it necessary to formulate alternative interpretations for some of the major features in the model. Five of these alternatives were developed so they could be modeled in the same fashion as the base model. This work was done for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Underground Test Area subproject of the Environmental Restoration Project.« less

  9. Closure Report for Corrective Action Unit 516: Septic Systems and Discharge Points

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 516 is located in Areas 3, 6, and 22 of the Nevada Test Site. CAU 516 is listed in the Federal Facility Agreement and Consent Order of 1996 as Septic Systems and Discharge Points, and is comprised of six Corrective Action Sites (CASs): {sm_bullet} CAS 03-59-01, Bldg 3C-36 Septic System {sm_bullet} CAS 03-59-02, Bldg 3C-45 Septic System {sm_bullet} CAS 06-51-01, Sump and Piping {sm_bullet} CAS 06-51-02, Clay Pipe and Debris {sm_bullet} CAS 06-51-03, Clean Out Box and Piping {sm_bullet} CAS 22-19-04, Vehicle Decontamination Area The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASsmore » 06-51-02 and 22-19-04 is no further action. The NDEP-approved corrective action alternative for CASs 03-59-01, 03-59-02, 06-51-01, and 06-51-03 is clean closure. Closure activities included removing and disposing of total petroleum hydrocarbon (TPH)-impacted septic tank contents, septic tanks, distribution/clean out boxes, and piping. CAU 516 was closed in accordance with the NDEP-approved CAU 516 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 516 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2004). This Closure Report documents CAU 516 closure activities. During closure activities, approximately 186 tons of hydrocarbon waste in the form of TPH-impacted soil and debris, as well as 89 tons of construction debris, were generated and managed and disposed of appropriately. Waste minimization techniques, such as field screening of soil samples and the utilization of laboratory analysis to characterize and classify waste streams, were employed during the performance of closure work.« less

  10. 78 FR 23515 - Regulated Navigation Areas, Security Zones: Dignitary Arrival/Departure and United Nations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... security zones as RNAs. The Marine Air Terminal, United Nations, and United Nations West Channel Closure... United Nations General Assembly RNA Regulated Navigation Area UN United Nations A. Public Participation... comment, it will be considered as having been received by the Coast Guard when it is received at the...

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less

  12. 36 CFR 13.1146 - What other closures and restrictions apply to commercial fishermen and commercial fishing vessels?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR NATIONAL PARK SYSTEM UNITS IN ALASKA Special Regulations-Glacier Bay National Park and Preserve Commercial Fishing § 13.1146... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false What other closures and...

  13. 75 FR 31425 - Drill Pipe from the People's Republic of China: Postponement of Preliminary Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-03

    ..., as amended (``the Act'').\\1\\ \\1\\ Due to the extended closure of the Government between February 5 and... Government Closure During the Recent Snowstorm, available at http://ia.ita.doc.gov/download/administrative... Conversion, Inc., Rotary Drilling Tools, TMK IPSCO, and the United Steel, Paper and Forestry, Rubber...

  14. Radiation and scattering from cylindrically conformal printed antennas. Ph.D. Thesis Final Report

    NASA Technical Reports Server (NTRS)

    Kempel, Leo C.; Volakis, John L.

    1994-01-01

    Microstrip patch antennas offer considerable advantages in terms of weight, aerodynamic drag, cost, flexibility, and observables over more conventional protruding antennas. These flat patch antennas were first proposed over thirty years ago by Deschamps in the United States and Gutton and Baisinot in France. Such antennas have been analyzed and developed for planar as well as curved platforms. However, the methods used in these designs employ gross approximations, suffer from extreme computational burden, or require expensive physical experiments. The goal of this thesis is to develop accurate and efficient numerical modeling techniques which represent actual antenna structures mounted on curved surfaces with a high degree of fidelity. In this thesis, the finite element method is extended to cavity-backed conformal antenna arrays embedded in a circular, metallic, infinite cylinder. Both the boundary integral and absorbing boundary mesh closure conditions will be used for terminating the mesh. These two approaches will be contrasted and used to study the scattering and radiation behavior of several useful antenna configurations. An important feature of this study will be to examine the effect of curvature and cavity size on the scattering and radiation properties of wraparound conformal antenna arrays.

  15. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 411. Double Tracks Plutonium Dispersion (Nellis), Nevada Test and Training Range, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick K.

    2015-03-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 411, Double Tracks Plutonium Dispersion (Nellis). CAU 411 is located on the Nevada Test and Training Range and consists of a single corrective action site (CAS), NAFR-23-01, Pu Contaminated Soil. There is sufficient information and historical documentation from previous investigations and the 1996 interim corrective action to recommend closure of CAU 411 using the SAFER process. Based on existing data, the presumed corrective action for CAU 411 is clean closure. However, additional data will be obtained during a field investigationmore » to document and verify the adequacy of existing information, and to determine whether the CAU 411 closure objectives have been achieved. This SAFER Plan provides the methodology to gather the necessary information for closing the CAU. The results of the field investigation will be presented in a closure report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated based on the data quality objectives (DQOs) developed on November 20, 2014, by representatives of NDEP, the U.S. Air Force (USAF), and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office. The DQO process was used to identify and define the type, amount, and quality of data needed to determine whether CAU 411 closure objectives have been achieved. The following text summarizes the SAFER activities that will support the closure of CAU 411; Collect environmental samples from designated target populations to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information; If COCs are no longer present, establish clean closure as the corrective action; If COCs are present, the extent of contamination will be defined and further corrective actions will be evaluated with the stakeholders (NDEP, USAF); and Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  16. 77 FR 41374 - Certain Hot-Rolled Carbon Steel Flat Products From India: Notice of Court Decision Not in Harmony...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... 14, 2011) (opinion on final results) (U.S. Steel Corp. I); Certain Hot- Rolled Carbon Steel Flat... DEPARTMENT OF COMMERCE International Trade Administration [A-533-820] Certain Hot-Rolled Carbon...-rolled carbon steel flat products from India. See U.S. Steel Corp. v. United States, No. 08-00216, 2012...

  17. [Prompt control of an imported carbapenem-resistant Acinetobacter baumanii outbreak in a French intensive care unit].

    PubMed

    Guth, C; Cavalli, Z; Pernod, C; Lhopital, C; Wey, Pf; Gerome, P; Turc, J

    2016-01-01

    to describe the management and control of a limited outbreak of carbapenem-resistant Acinetobacter baumanii (CRAB) outbreak in a French intensive care unit. Careful review of the contact's and carrier's files and outbreak management procedures. An undiagnosed CRAB carrier was admitted to our intensive care unit after medical evacuation from Turkey. Despite preventive isolation and contact precautions, a secondary case was diagnosed 5 days after admission of the index case and resulted in the creation of a crisis unit. Prompt management included an epidemiologic investigation with contact screening and follow-up, environmental screening, and additional restrictive measures: isolation room, closure of adjacent rooms, patient cohorting with designated nurses, and reinforcement of contact precautions. restrictive management of CRAB outbreaks may allow prompt outbreak control and avoid prolonged room closures.

  18. Edge-closed laminated structures for thin-film heads

    NASA Astrophysics Data System (ADS)

    Herman, D. A.; Argyle, B. E.; Lee, H.-P.; Trouilloud, P. O.; Petek, B.

    1991-04-01

    Magnetic film laminations containing nonmagnetic spacers have been explored with the hope of eliminating domain walls to diminish Barkhausen instabilities. Such laminates have limitations however, which originate in their ``edge-curling walls'' (ECWs).1 We have developed a new structure, free of ECWs, in which flux closure at opposing edges occurs via edge-shorting material added to circulate the easy-axis flux of the flat layers. We show experimentally with Kerr-effect imaging that (1) this edge-closed laminated (ECL) structure can support an (ECW-free) ``easy-axis'' (EA) magnetic state under conditions as modeled recently by Slonczewski,2 and (2) that this EA state is quite robust in the face of imperfect structure fabrication. This is, if the imperfections are not too severe, the resultant states depart minimally from the pure EA state and conduct hard-axis-driven flux nearly as well. Flat-film ECL elements in diamond, stripe, and recording-head-yoke shapes, plus experimental heads with ECL top yokes, were fabricated. Our domain images verify some key predictions from Slonczewski's static equilibrium modeling; additional results taken in applied magnetic fields extend the micromagnetic understanding. The sketch shows a typical domain pattem for a yoke-shaped element. The most stable state in the open portion of the yoke is the single domain shown. This remanent pattern was stable in the face of (slowly varying) external fields up to the 150 Oe that could be applied. The pole tip region contained a few 180° walls as indicated. On close inspection, these walls were seen to end in vestigial, nontouching, closure domains as predicted by the model when only partial flux closure occurs via the edge shorting material. The wall spacing in the tip varied somewhat following saturation-demagnetization cycles. The dynamic stability of this EA state was investigated in the experimental heads having ECL top yokes. The pseudodynamic LAMOM technique3 was applied using ``write'' pulsations. The EA state was stable up to twice typical write currents. A movie of dynamic results will be shown.

  19. Hospital closures had no measurable impact on local hospitalization rates or mortality rates, 2003-11.

    PubMed

    Joynt, Karen E; Chatterjee, Paula; Orav, E John; Jha, Ashish K

    2015-05-01

    The Affordable Care Act (ACA) set in motion payment changes that could put pressure on hospital finances and lead some hospitals to close. Understanding the impact of closures on patient care and outcomes is critically important. We identified 195 hospital closures in the United States between 2003 and 2011. We found no significant difference between the change in annual mortality rates for patients living in hospital service areas (HSAs) that experienced one or more closures and the change in rates in matched HSAs without a closure (5.5 percent to 5.2 percent versus 5.4 percent to 5.4 percent, respectively). Nor was there a significant difference in the change in all-cause mortality rates following hospitalization (9.1 percent to 8.2 percent in HSAs with a closure versus 9.0 percent to 8.4 percent in those without a closure). HSAs with a closure had a drop in readmission rates compared to controls (19.4 percent to 18.2 percent versus 18.8 percent to 18.3 percent). Overall, we found no evidence that hospital closures were associated with worse outcomes for patients living in those communities. These findings may offer reassurance to policy makers and clinical leaders concerned about the potential acceleration of hospital closures as a result of health care reform. Project HOPE—The People-to-People Health Foundation, Inc.

  20. 78 FR 33067 - Fisheries of the United States; NOAA Fisheries Policy for Modifying Fisheries Closures in the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-03

    ... regarding those closures to the public during a public health emergency or oil spill characterized by... regulations to address a public health emergency or oil spill. Section 305(c)(3) states: (3) Any emergency... on a permanent basis; (C) that responds to a public health emergency or an oil spill may remain in...

  1. Corrective Action Decision Document/Closure Report for Corrective Action Unit 541: Small Boy Nevada National Security Site and Nevada Test and Training Range, Nevada, Revision 0 with ROTC-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kidman, Raymond; Matthews, Patrick

    The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 541 based on the no further action alternative listed in Table ES-1.

  2. 77 FR 73957 - Fisheries of the Northeastern United States; Atlantic Sea Scallop Fishery; Closure of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ... fishing effort in this area, which could reduce long-term scallop biomass and optimum yield from the ETA... them to grow. Following closure of the ETA, scallop biomass increased steadily in the area. When the ETA opened in 2007, it contained over one-quarter of the total scallop biomass. The area was fished as...

  3. Flat inferior vena cava: indicator of poor prognosis in trauma and acute care surgery patients.

    PubMed

    Ferrada, Paula; Vanguri, Poornima; Anand, Rahul J; Whelan, James; Duane, Therese; Wolfe, Luke; Ivatury, Rao

    2012-12-01

    Flat inferior vena cava (IVC) on ultrasound examination has been shown to correlate with hypovolemic status. We hypothesize that a flat IVC on limited echocardiogram (LTTE) performed in the emergency room (ER) correlates with poor prognosis in acutely ill surgical patients. We conducted a retrospective review of all patients undergoing LTTE in the ER from September 2010 until June 2011. IVC diameter was estimated by subxiphoid window. Flat IVC was defined as diameter less than 2 cm. Fat IVC was defined as diameter greater than 2 cm. Need for intensive care unit admission, blood transfusion requirement, mortality, and need for emergent operation between patients with flat versus Fat IVC were compared. One hundred one hypotensive patients had LTTE performed in the ER. Average age was 38 years. Admission diagnosis was blunt trauma (n = 80), penetrating trauma (n = 13), acute care surgery pathology (n = 7), and burn (n = 1). Seventy-four patients had flat IVC on initial LTTE. Compared with those with fat IVC, flat patients were found have higher rates of intensive care unit admission (51.3 vs 14.8%; P = 0.001), blood transfusion requirement (12.2 vs 3.7%), and mortality (13.5 vs 3.7%). This population also underwent emergent surgery on hospital Day 1 more often (16.2 vs 0%; P = 0.033). Initial flat IVC on LTTE is an indicator of hypovolemia and a predictor of poor outcome.

  4. Closure Report for Corrective Action Unit 573: Alpha Contaminated Sites Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less

  5. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Stationmore » (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.« less

  6. Completion Report for Well ER-3-3 Corrective Action Unit 97: Yucca Flat/Climax Mine, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wurtz, Jeffrey; Rehfeldt, Ken

    Well ER-3-3 was drilled for the U.S. Department of Energy, Nevada National Security Administration Nevada Field Office in support of the Underground Test Area (UGTA) Activity. The well was drilled and completed from February 21 to March 15, 2016, as part of the Corrective Action Investigation Plan (CAIP) for Yucca Flat/Climax Mine Corrective Action Unit (CAU) 97. The primary purpose of the well was to collect hydrogeologic data to assist in validating concepts of the flow system within the Yucca Flat/Climax Mine CAU, and to test for potential radionuclides in groundwater from the WAGTAIL (U3an) underground test.

  7. A Riemann solver for RANS

    NASA Astrophysics Data System (ADS)

    Chuvakhov, P. V.

    2014-01-01

    An exact expression for a system of both eigenvalues and right/left eigenvectors of a Jacobian matrix for a convective two-equation differential closure RANS operator split along a curvilinear coordinate is derived. It is shown by examples of numerical modeling of supersonic flows over a flat plate and a compression corner with separation that application of the exact system of eigenvalues and eigenvectors to the Roe approach for approximate solution of the Riemann problem gives rise to an increase in the convergence rate, better stability and higher accuracy of a steady-state solution in comparison with those in the case of an approximate system.

  8. 75 FR 24744 - Notice of Lodging of Consent Decree Under the Comprehensive Environmental Response, Compensation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Decree in United States of America v. AGC Flat Glass North America, Inc., et al., Civil Action No. 1:10... County, West Virginia (the ``Site''). The Consent Decree obligates AGC Flat Glass North America, Inc. and... States of America v. AGC Flat Glass North America, Inc., et al., Civil Action No. 1:10-cv-00069-IMK, (N.D...

  9. Exploiting similarity in turbulent shear flows for turbulence modeling

    NASA Technical Reports Server (NTRS)

    Robinson, David F.; Harris, Julius E.; Hassan, H. A.

    1992-01-01

    It is well known that current k-epsilon models cannot predict the flow over a flat plate and its wake. In an effort to address this issue and other issues associated with turbulence closure, a new approach for turbulence modeling is proposed which exploits similarities in the flow field. Thus, if we consider the flow over a flat plate and its wake, then in addition to taking advantage of the log-law region, we can exploit the fact that the flow becomes self-similar in the far wake. This latter behavior makes it possible to cast the governing equations as a set of total differential equations. Solutions of this set and comparison with measured shear stress and velocity profiles yields the desired set of model constants. Such a set is, in general, different from other sets of model constants. The rational for such an approach is that if we can correctly model the flow over a flat plate and its far wake, then we can have a better chance of predicting the behavior in between. It is to be noted that the approach does not appeal, in any way, to the decay of homogeneous turbulence. This is because the asymptotic behavior of the flow under consideration is not representative of the decay of homogeneous turbulence.

  10. Exploiting similarity in turbulent shear flows for turbulence modeling

    NASA Astrophysics Data System (ADS)

    Robinson, David F.; Harris, Julius E.; Hassan, H. A.

    1992-12-01

    It is well known that current k-epsilon models cannot predict the flow over a flat plate and its wake. In an effort to address this issue and other issues associated with turbulence closure, a new approach for turbulence modeling is proposed which exploits similarities in the flow field. Thus, if we consider the flow over a flat plate and its wake, then in addition to taking advantage of the log-law region, we can exploit the fact that the flow becomes self-similar in the far wake. This latter behavior makes it possible to cast the governing equations as a set of total differential equations. Solutions of this set and comparison with measured shear stress and velocity profiles yields the desired set of model constants. Such a set is, in general, different from other sets of model constants. The rational for such an approach is that if we can correctly model the flow over a flat plate and its far wake, then we can have a better chance of predicting the behavior in between. It is to be noted that the approach does not appeal, in any way, to the decay of homogeneous turbulence. This is because the asymptotic behavior of the flow under consideration is not representative of the decay of homogeneous turbulence.

  11. Is adhesive paper-tape closure of video assisted thoracoscopic port-sites safe?

    PubMed

    Luckraz, Heyman; Rammohan, Kandadai S; Phillips, Mabel; O'Keefe, Peter A

    2007-07-01

    Video assisted thoracoscopic surgery (VATS) is used in lung surgery for diagnostic, staging, curative and palliative purposes. The port-sites are usually sutured with dissolvable sutures. The use of adhesive paper-tape for port-site closure was assessed by a prospective randomised double-blind control trial comparing sutured to adhesive paper-tape closure. The following outcomes were assessed: incidence of clinically significant pneumothorax, wound healing using the ASEPSIS score, patient's comfort (pain score using a visual analog score), the time difference between the two techniques of wound closure and cost savings. Thirty patients were recruited in each group. No clinically significant pneumothoraces occurred in either group. There were no significant differences between the two groups in terms of immediate post-operative pain scores, wound cosmesis and wound complications. It was quicker to close the wound with adhesive paper-tape with a mean time of closure per unit length of wound of 9.3 and 2.2s/mm for the groups, respectively. The cost for wound closure (per patient) was $0.8 for the adhesive paper-tape group and $4.00 for the sutures.

  12. Autonomic Closure for Turbulent Flows Using Approximate Bayesian Computation

    NASA Astrophysics Data System (ADS)

    Doronina, Olga; Christopher, Jason; Hamlington, Peter; Dahm, Werner

    2017-11-01

    Autonomic closure is a new technique for achieving fully adaptive and physically accurate closure of coarse-grained turbulent flow governing equations, such as those solved in large eddy simulations (LES). Although autonomic closure has been shown in recent a priori tests to more accurately represent unclosed terms than do dynamic versions of traditional LES models, the computational cost of the approach makes it challenging to implement for simulations of practical turbulent flows at realistically high Reynolds numbers. The optimization step used in the approach introduces large matrices that must be inverted and is highly memory intensive. In order to reduce memory requirements, here we propose to use approximate Bayesian computation (ABC) in place of the optimization step, thereby yielding a computationally-efficient implementation of autonomic closure that trades memory-intensive for processor-intensive computations. The latter challenge can be overcome as co-processors such as general purpose graphical processing units become increasingly available on current generation petascale and exascale supercomputers. In this work, we outline the formulation of ABC-enabled autonomic closure and present initial results demonstrating the accuracy and computational cost of the approach.

  13. Columbus Closure Project Released without Radiological Restrictions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henderson, G.

    2007-07-01

    The Columbus Closure Project (CCP), a historic radiological research complex, was cleaned up for future use without radiological restriction in 2006. The CCP research and development site contributed to national defense, nuclear fuel fabrication, and the development of safe nuclear reactors in the United States until 1988 when research activities were concluded for site decommissioning. In November of 2003, the Ohio Field Office of the U.S. Department of Energy contracted ECC/E2 Closure Services, LLC (Closure Services) to complete the removal of radioactive contamination from of a 1955 era nuclear sciences area consisting of a large hot cell facility, research reactormore » building and underground piping. The project known as the Columbus Closure Project (CCP) was completed in 27 months and brought to a close 16 years of D and D in Columbus, Ohio. This paper examines the project innovations and challenges presented during the Columbus Closure Project. The examination of the CCP includes the project regulatory environment, the CS safety program, accelerated clean up innovation, project execution strategies and management of project waste issues and the regulatory approach to site release 'without radiological restrictions'. (authors)« less

  14. Positive Catch & Economic Benefits of Periodic Octopus Fishery Closures: Do Effective, Narrowly Targeted Actions ‘Catalyze’ Broader Management?

    PubMed Central

    Oliver, Thomas A.; Oleson, Kirsten L. L.; Ratsimbazafy, Hajanaina; Raberinary, Daniel; Benbow, Sophie; Harris, Alasdair

    2015-01-01

    Overview Eight years of octopus fishery records from southwest Madagascar reveal significant positive impacts from 36 periodic closures on: (a) fishery catches and (b) village fishery income, such that (c) economic benefits from increased landings outweigh costs of foregone catch. Closures covered ~20% of a village’s fished area and lasted 2-7 months. Fishery Catches from Each Closed Site Octopus landings and catch per unit effort (CPUE) significantly increased in the 30 days following a closure’s reopening, relative to the 30 days before a closure (landings: +718%, p<0.0001; CPUE: +87%, p<0.0001; n = 36). Open-access control sites showed no before/after change when they occurred independently of other management (“no ban”, n = 17/36). On the other hand, open-access control sites showed modest catch increases when they extended a 6-week seasonal fishery shutdown (“ban”, n = 19/36). The seasonal fishery shutdown affects the entire region, so confound all potential control sites. Fishery Income in Implementing Villages In villages implementing a closure, octopus fishery income doubled in the 30 days after a closure, relative to 30 days before (+132%, p<0.001, n = 28). Control villages not implementing a closure showed no increase in income after “no ban” closures and modest increases after “ban” closures. Villages did not show a significant decline in income during closure events. Net Economic Benefits from Each Closed Site Landings in closure sites generated more revenue than simulated landings assuming continued open-access fishing at that site (27/36 show positive net earnings; mean +$305/closure; mean +57.7% monthly). Benefits accrued faster than local fishers’ time preferences during 17-27 of the 36 closures. High reported rates of illegal fishing during closures correlated with poor economic performance. Broader Co-Management We discuss the implications of our findings for broader co-management arrangements, particularly for catalyzing more comprehensive management. PMID:26083862

  15. 21 CFR 211.186 - Master production and control records.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... description of the drug product containers, closures, and packaging materials, including a specimen or copy of... form; (2) The name and weight or measure of each active ingredient per dosage unit or per unit of...

  16. 21 CFR 211.186 - Master production and control records.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... description of the drug product containers, closures, and packaging materials, including a specimen or copy of... form; (2) The name and weight or measure of each active ingredient per dosage unit or per unit of...

  17. Closure Report for Corrective Action Unit 151: Septic Systems and Discharge Area, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-04-01

    Corrective Action Unit (CAU) 151 is identified in the Federal Facility Agreement and Consent Order (FFACO) as Septic Systems and Discharge Area. CAU 151 consists of the following eight Corrective Action Sites (CASs), located in Areas 2, 12, and 18 of the Nevada Test Site, approximately 65 miles northwest of Las Vegas, Nevada: (1) CAS 02-05-01, UE-2ce Pond; (2) CAS 12-03-01, Sewage Lagoons (6); (3) CAS 12-04-01, Septic Tanks; (4) CAS 12-04-02, Septic Tanks; (5) CAS 12-04-03, Septic Tank; (6) CAS 12-47-01, Wastewater Pond; (7) CAS 18-03-01, Sewage Lagoon; and (8) CAS 18-99-09, Sewer Line (Exposed). CAU 151 closure activitiesmore » were conducted according to the FFACO (FFACO, 1996; as amended February 2008) and the Corrective Action Plan for CAU 151 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007) from October 2007 to January 2008. The corrective action alternatives included no further action, clean closure, and closure in place with administrative controls. CAU 151 closure activities are summarized in Table 1. Closure activities generated liquid remediation waste, sanitary waste, hydrocarbon waste, and mixed waste. Waste generated was appropriately managed and disposed. Waste that is currently staged onsite is being appropriately managed and will be disposed under approved waste profiles in permitted landfills. Waste minimization activities included waste characterization sampling and segregation of waste streams. Some waste exceeded land disposal restriction limits and required offsite treatment prior to disposal. Other waste meeting land disposal restrictions was disposed of in appropriate onsite or offsite landfills. Waste disposition documentation is included as Appendix C.« less

  18. Influence of canopy closure and shrub coverage on travel along coarse woody debris by Eastern chipmunks (Tamias striatus)

    Treesearch

    Patrick A. Zollner; Kevin J. Crane

    2003-01-01

    We investigated relationships between canopy closure, shrub cover and the use of coarse woody debris as a travel path by eastern chipmunks (Tamias striatus) in the north central United States. Fine scale movements of chipmunks were followed with tracking spools and the percentage of each movement path directly along coarse woody debris was recorded...

  19. Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada: Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    This Closure Report (CR) presents information supporting a closure recommendation for Corrective Action Unit (CAU) 394: Areas 12, 18, and 29 Spill/Release Sites, Nevada Test Site, Nevada, in compliance with the requirements of the Federal Facility Agreement and Consent Order. This CAU contains six Corrective Action Sites (CASs): 12-25-04, UST 12-16-2 Waste Oil Release; 18-25-01, 18-25-02, 18-25-03, Oil Spills; 18-25-04, Spill (Diesel Fuel); and 29-44-01, Fuel Spill, located within Areas 12, 18, and 29 on the Nevada Test Site. The purpose of this CR is to provide documentation supporting recommendations of no further action or closure in place for CASsmore » within CAU 394. Throughout late 2002 and early to mid 2003, closure activities were performed as set forth in the CAU 394 Streamlined Approach for Environmental Restoration Plan. The closure activities identified the nature and extent of contaminants of potential concern at the CASs, and provided sufficient information and data to complete appropriate corrective actions for the CASs. Soil in CASs 18-25-02 and 18-25-03 containing polychlorinated biphenyls exceeding the action levels established by the Nevada Administrative Code were removed for proper disposal. The soil remaining in these CASs containing petroleum hydrocarbons exceeding the action level were closed in place with use restrictions. Corrective Action Sites 18-25-04 required no further corrective action; closure in place is required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03, and 29-44-01; and use restrictions are required at CASs 12-25-04, 18-25-01, 18-25-02, 18-25-03 and 29-44-01. In summary, no corrective action plan is required for CAU 394.« less

  20. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Fiscal Year 2012 (October 2011–September 2012)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2013-01-17

    This report serves as the combined annual report for post-closure activities for the following closed Corrective Action Units (CAUs): · CAU 90, Area 2 Bitcutter Containment · CAU 91, Area 3 U-3fi Injection Well · CAU 92, Area 6 Decon Pond Facility · CAU 110, Area 3 WMD U-3ax/bl Crater · CAU 111, Area 5 WMD Retired Mixed Waste Pits · CAU 112, Area 23 Hazardous Waste Trenches This report covers fiscal year 2012 (October 2011–September 2012).

  1. Addendum to the Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the July 2003, Closure Report for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

  2. Severe Accident Sequence Analysis Program: Anticipated transient without scram simulations for Browns Ferry Nuclear Plant Unit 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dallman, R J; Gottula, R C; Holcomb, E E

    1987-05-01

    An analysis of five anticipated transients without scram (ATWS) was conducted at the Idaho National Engineering Laboratory (INEL). The five detailed deterministic simulations of postulated ATWS sequences were initiated from a main steamline isolation valve (MSIV) closure. The subject of the analysis was the Browns Ferry Nuclear Plant Unit 1, a boiling water reactor (BWR) of the BWR/4 product line with a Mark I containment. The simulations yielded insights to the possible consequences resulting from a MSIV closure ATWS. An evaluation of the effects of plant safety systems and operator actions on accident progression and mitigation is presented.

  3. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada National Security Site (NNSS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs aremore » included as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NNSS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  4. Corrective Action Decision Document/Corrective Action Plan for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-07-31

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the 92-Acre Area, the southeast quadrant of the Radioactive Waste Management Site, located in Area 5 of the Nevada Test Site (NTS). The 92-Acre Area includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' Data Quality Objectives (DQOs) were developed for the 92-Acre Area, which includes CAU 111. The result of the DQO process was that the 92-Acre Area is sufficiently characterized to provide the input data necessary to evaluate corrective action alternatives (CAAs) without the collection of additional data. The DQOs are includedmore » as Appendix A of this document. This CADD/CAP identifies and provides the rationale for the recommended CAA for the 92-Acre Area, provides the plan for implementing the CAA, and details the post-closure plan. When approved, this CADD/CAP will supersede the existing Pit 3 (P03) Closure Plan, which was developed in accordance with Title 40 Code of Federal Regulations (CFR) Part 265, 'Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities.' This document will also serve as the Closure Plan and the Post-Closure Plan, which are required by 40 CFR 265, for the 92-Acre Area. After closure activities are complete, a request for the modification of the Resource Conservation and Recovery Act Permit that governs waste management activities at the NTS will be submitted to the Nevada Division of Environmental Protection to incorporate the requirements for post-closure monitoring. Four CAAs, ranging from No Further Action to Clean Closure, were evaluated for the 92-Acre Area. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of the data used to develop the conceptual site model; a review of past, current, and future operations at the site; and the detailed and comparative analysis of the potential CAAs, Closure in Place with Administrative Controls is the preferred CAA for the 92-Acre Area. Closure activities will include the following: (1) Constructing an engineered evapotranspiration cover over the 92-Acre Area; (2) Installing use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; (3) Establishing vegetation on the cover; (4) Implementing a UR; and (5) Implementing post-closure inspections and monitoring. The Closure in Place with Administrative Controls alternative meets all requirements for the technical components evaluated, fulfills all applicable federal and state regulations for closure of the site, and will minimize potential future exposure pathways to the buried waste at the site.« less

  5. Closure plan for Corrective Action Unit 109: U-2bu subsidence crater, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facility Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). Based on the results of the analyses reported in the site characterization report, the only constituents ofmore » concern in the U-2bu subsidence crater include leachable lead and total petroleum hydrocarbons. Closure activities will include the excavation and disposal of impacted soil from the top of the crater. Upon completion of excavation, verification samples will be collected to show that the leachable lead has been removed to concentrations below the regulatory action level. After sample results show that the lead has been removed, the excavated area will be backfilled and a soil flood diversion berm will be constructed as a best management practice. An independent registered professional engineer will certify the site was closed following the approved Closure Plan. Post-closure care is not warranted for this site because closure activities will involve removal of the Resource Conservation and Recovery Act constituents of concern.« less

  6. THE INTEGRATION OF THE 241-Z BUILDING DECONTAMINATION & DECOMMISSIONING (D&D) UNDER COMPREHENSIVE ENVIRONMENTAL RESPONSE COMPENSATION & LIABILITY ACT (CERCLA) WITH RESOURCE CONSERVATION & RECOVERY ACT (RCRA) CLOSURE AT THE PLUTONIUM FINISHING PLANT (PFP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2007-02-20

    The 241-Z treatment and storage tanks, a hazardous waste Treatment, Storage and Disposal (TSD) unit permitted pursuant to the ''Resource Conservation and Recovery Act of 1976'' (RCRA) and Washington State ''Hazardous Waste Management Act, RCW 70.105'', have been deactivated and are being actively decommissioned. The 241-Z TSD unit managed non-listed radioactive contaminated waste water, containing trace RCRA characteristic constituents. The 241-Z TSD unit consists of below grade tanks (D-4, D-5, D-7, D-8, and an overflow tank) located in a concrete containment vault, sample glovebox GB-2-241-ZA, and associated ancillary piping and equipment. The tank system is located beneath the 241-Z building.more » The 241-Z building is not a portion of the TSD unit. The sample glovebox is housed in the above-grade building. Waste managed at the TSD unit was received via underground mining from Plutonium Finishing Plant (PFP) sources. Tank D-6, located in the D-6 vault cell, is a past-practice tank that was taken out of service in 1972 and has never operated as a portion of the RCRA TSD unit. CERCLA actions address Tank D-6, its containment vault cell, and soil beneath the cell that was potentially contaminated during past-practice operations and any other potential past-practice contamination identified during 241-Z closure, while outside the scope of the ''Hanford Facility Dangerous Waste Closure Plant, 241-Z Treatment and Storage Tanks''.« less

  7. Aerolization During Boron Nanoparticle Multi-Component Fuel Group Burning Studies

    DTIC Science & Technology

    2014-02-03

    Anderson, University of Utah). …………………… 14 Figure 2. Photograph of group burning facility showing benchtop flat flame burner unit with injector nozzle ...and (B) aerosol generator. 16 Figure 6. Diagram of benchtop flat flame burner unit showing injector nozzle assembly with VOAG orifice, fuel and...translation stage, variable fuel and gas supply rates, and injector nozzles that can be configured to investigate diffusion and premixed flames (Fig. 2 & 3

  8. Multidisciplinary management of patent foramen ovale (PFO) and cryptogenic stroke/TIA

    PubMed Central

    Mirzada, Naqibullah; Ladenvall, Per; Hansson, Per-Olof; Eriksson, Peter; Dellborg, Mikael

    2013-01-01

    Purpose Patent foramen ovale (PFO) has been implicated as a risk factor for cryptogenic ischemic stroke (CS). However, there is still a lack of widely accepted, undisputed indications for PFO closure. The present study describes the concept of the multidisciplinary PFO conference and a decision making process for closure versus no closure that was developed into a formalized clinical algorithm, and presents the results of implementing these, in terms of number and proportion of PFO closures as well as repeat referrals. Design Five specialists in neurology, cardiology, internal medicine, thromboembolism, and echocardiography evaluated the clinical data of 311 patients at PFO conferences during 2006 to 2009. The main criteria for closure were patients with first-ever CS with PFO and atrial septal aneurysm, or patients with recurrent CS and PFO without atrial septal aneurysm. Results A total of 143 patients (46%) were accepted for closure and 167 patients were rejected. Patients accepted for closure were younger (mean 50 years versus 58 years) (P < 0.001). The acceptance rate for PFO closure was similar throughout these years, with an average of 45%. Three of 167 patients (1.8%) initially rejected for PFO closure were re-referred due to recurrent stroke, and the PFO closure was subsequently performed. Conclusion The acceptance rate of less than 50% in the present study underscores the complex relationship between CS and PFO. Whatever the criteria used for PFO closure, any unit caring for these patients needs to have a rigorous process to avoid overtreatment as well as undertreatment and to ensure that personal preferences and economic incentives do not steer the selection process. Our algorithm provides a stable acceptance rate and a low rate of repeat referrals. PMID:24082787

  9. Variability in school closure decisions in response to 2009 H1N1: a qualitative systems improvement analysis

    PubMed Central

    2011-01-01

    Background School closure was employed as a non-pharmaceutical intervention against pandemic 2009 H1N1, particularly during the first wave. More than 700 schools in the United States were closed. However, closure decisions reflected significant variation in rationales, decision triggers, and authority for closure. This variability presents the opportunity for improved efficiency and decision-making. Methods We identified media reports relating to school closure as a response to 2009 H1N1 by monitoring high-profile sources and searching Lexis-Nexis and Google news alerts, and reviewed reports for key themes. News stories were supplemented by observing conference calls and meetings with health department and school officials, and by discussions with decision-makers and community members. Results There was significant variation in the stated goal of closure decision, including limiting community spread of the virus, protecting particularly vulnerable students, and responding to staff shortages or student absenteeism. Because the goal of closure is relevant to its timing, nature, and duration, unclear rationales for closure can challenge its effectiveness. There was also significant variation in the decision-making authority to close schools in different jurisdictions, which, in some instances, was reflected in open disagreement between school and public health officials. Finally, decision-makers did not appear to expect the level of scientific uncertainty encountered early in the pandemic, and they often expressed significant frustration over changing CDC guidance. Conclusions The use of school closure as a public health response to epidemic disease can be improved by ensuring that officials clarify the goals of closure and tailor closure decisions to those goals. Additionally, authority to close schools should be clarified in advance, and decision-makers should expect to encounter uncertainty disease emergencies unfold and plan accordingly. PMID:21284865

  10. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment

    PubMed Central

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B.

    2016-01-01

    ABSTRACT Introduction: Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. Objective: This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts. PMID:27275623

  11. Understanding the basis of space closure in Orthodontics for a more efficient orthodontic treatment.

    PubMed

    Ribeiro, Gerson Luiz Ulema; Jacob, Helder B

    2016-01-01

    Space closure is one of the most challenging processes in Orthodontics and requires a solid comprehension of biomechanics in order to avoid undesirable side effects. Understanding the biomechanical basis of space closure better enables clinicians to determine anchorage and treatment options. In spite of the variety of appliance designs, space closure can be performed by means of friction or frictionless mechanics, and each technique has its advantages and disadvantages. Friction mechanics or sliding mechanics is attractive because of its simplicity; the space site is closed by means of elastics or coil springs to provide force, and the brackets slide on the orthodontic archwire. On the other hand, frictionless mechanics uses loop bends to generate force to close the space site, allowing differential moments in the active and reactive units, leading to a less or more anchorage control, depending on the situation. This article will discuss various theoretical aspects and methods of space closure based on biomechanical concepts.

  12. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Fiscal Year 2015 (October 2014–September 2015), Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs); CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; and CAU 112, Area 23 Hazardous Waste Trenches. This report covers fiscal year 2015 (October 2014 through September 2015). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and are summarized in each CAU-specific section inmore » Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.« less

  13. Closure Report for Corrective Action Unit 568: Area 3 Plutonium Dispersion Sites Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    The purpose of this CR is to provide documentation and justification that no further corrective action is needed for the closure of CAU 568 based on the implementation of corrective actions. This includes a description of closure activities that were performed and an evaluation of the verification data. The CAP (NNSA/NFO, 2016a) and ROTC-1 (NNSA/NFO, 2016c) provide information relating to the selection of CAAs and the reasoning behind their selection. The CADD (NNSA/NFO, 2015) identifies the release sites that require additional corrective action and presents information supporting the selection of CAAs.

  14. The Impact of Public Hospital Closure on Medical and Residency Education: Implications and Recommendations

    PubMed Central

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2010-01-01

    Background Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. Objective To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Method Retrospective cohort study of medical students’ and residents’ and clinical placement into safety-net experiences after the closure of the primary teaching hospital. Results The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. Conclusion While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location. PMID:19110905

  15. The impact of public hospital closure on medical and residency education: implications and recommendations.

    PubMed

    Walker, Kara Odom; Calmes, Daphne; Hanna, Nancy; Baker, Richard

    2008-12-01

    Challenges around safety-net hospital closure have impacted medical student and resident exposure to urban public healthcare sites that may influence their future practice choices. To assess the impact of the closure of a public safety-net teaching hospital for the clinical medical education of Charles Drew University medical students and residents. Retrospective cohort study of medical students' and residents' and clinical placement into safety-net experiences after the closure of the primary teaching hospital. The hospital closure impacted both medical student and residency training experiences. Only 71% (17/24) of medical student rotations and 13% (23/180) of residents were maintained at public safety-net clinical sittings. The closure of the public safety-net hospital resulted in the loss of 36% of residency training spots sponsored by historically black medical schools in the United States and an even larger negative impact on the number of physicians training in underserved urban areas of Los Angeles County. While the medical educational program changes undertaken in the wake of hospital closure have negatively affected the immediate clinical educational experiences of medical students and residents, it remains to be seen whether the training site location changes will alter their long-term preferences in specialty choice and practice location.

  16. Closure Report for Corrective Action Unit 408: Bomblet Target Area Tonopah Test Range (TTR), Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-09-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less

  17. Sub-crop geologic map of pre-Tertiary rocks in the Yucca Flat and northern Frenchman Flat areas, Nevada Test Site, southern Nevada

    USGS Publications Warehouse

    Cole, James C.; Harris, Anita G.; Wahl, Ronald R.

    1997-01-01

    This map displays interpreted structural and stratigraphic relations among the Paleozoic and older rocks of the Nevada Test Site region beneath the Miocene volcanic rocks and younger alluvium in the Yucca Flat and northern Frenchman Flat basins. These interpretations are based on a comprehensive examination and review of data for more than 77 drillholes that penetrated part of the pre-Tertiary basement beneath these post-middle Miocene structural basins. Biostratigraphic data from conodont fossils were newly obtained for 31 of these holes, and a thorough review of all prior microfossil paleontologic data is incorporated in the analysis. Subsurface relationships are interpreted in light of a revised regional geologic framework synthesized from detailed geologic mapping in the ranges surrounding Yucca Flat, from comprehensive stratigraphic studies in the region, and from additional detailed field studies on and around the Nevada Test Site.All available data indicate the subsurface geology of Yucca Flat is considerably more complicated than previous interpretations have suggested. The western part of the basin, in particular, is underlain by relics of the eastward-vergent Belted Range thrust system that are folded back toward the west and thrust by local, west-vergent contractional structures of the CP thrust system. Field evidence from the ranges surrounding the north end of Yucca Flat indicate that two significant strike-slip faults track southward beneath the post-middle Miocene basin fill, but their subsurface traces cannot be closely defined from the available evidence. In contrast, the eastern part of the Yucca Flat basin is interpreted to be underlain by a fairly simple north-trending, broad syncline in the pre-Tertiary units. Far fewer data are available for the northern Frenchman Flat basin, but regional analysis indicates the pre- Tertiary structure there should also be relatively simple and not affected by thrusting.This new interpretation has implications for ground water flow through pre-Tertiary rocks beneath the Yucca Flat and northern Frenchman Flat areas, and has consequences for ground water modeling and model validation. Our data indicate that the Mississippian Chainman Shale is not a laterally extensive confining unit in the western part of the basin because it is folded back onto itself by the convergent structures of the Belted Range and CP thrust systems. Early and Middle Paleozoic limestone and dolomite are present beneath most of both basins and, regardless of structural complications, are interpreted to form a laterally continuous and extensive carbonate aquifer. Structural culmination that marks the French Peak accommodation zone along the topographic divide between the two basins provides a lateral pathway through highly fractured rock between the volcanic aquifers of Yucca Flat and the regional carbonate aquifer. This pathway may accelerate the migration of ground-water contaminants introduced by underground nuclear testing toward discharge areas beyond the Nevada Test Site boundaries. Predictive three-dimensional models of hydrostratigraphic units and ground-water flow in the pre-Tertiary rocks of subsurface Yucca Flat are likely to be unrealistic due to the extreme structural complexities. The interpretation of hydrologic and geochemical data obtained from monitoring wells will be difficult to extrapolate through the flow system until more is known about the continuity of hydrostratigraphic units.

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 252: Area 25 Engine Test Stand 1 Decontamination Pad, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DOE /NV

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 252: Area 25 Engine Test Stand-1 Decontamination Pad, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Located at the Nevada Test Site in Nevada, CAU 252 consists of only one Corrective Action Site (25-07-04, Decontamination Pad). This CADD/CR identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's) recommendation that no corrective action is deemed necessary at CAU 252. The Corrective Action Decision Document and Closure Report have been combined into one report because the potential contaminants of concern weremore » either not detected during the corrective action investigation or were only present at naturally occurring concentrations. Based on the field results, neither corrective action or a corrective action plan is required at this site. A Notice of Completion to DOE/NV is being requested from the Nevada Division of Environmental Protection for closure of CAU 252, as well as a request that this site be moved from Appendix III to Appendix IV of the FFACO. Further, no use restrictions are required to be placed on this CAU.« less

  19. A Hydrostratigraphic Framework Model and Alternatives for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 98: Frenchman Flat, Clark, Lincoln and Nye Counties, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada

    2005-09-01

    A new, revised three-dimensional (3-D) hydrostratigraphic framework model for Frenchman Flat was completed in 2004. The area of interest includes Frenchman Flat, a former nuclear testing area at the Nevada Test Site, and proximal areas. Internal and external reviews of an earlier (Phase I) Frenchman Flat model recommended additional data collection to address uncertainties. Subsequently, additional data were collected for this Phase II initiative, including five new drill holes and a 3-D seismic survey.

  20. A refined characterization of the alluvial geology of yucca flat and its effect on bulk hydraulic conductivity

    USGS Publications Warehouse

    Phelps, G.A.; Halford, K.J.

    2011-01-01

    In Yucca Flat, on the Nevada National Security Site in southern Nevada, the migration of radionuclides from tests located in the alluvial deposits into the Paleozoic carbonate aquifer involves passage through a thick, heterogeneous section of late Tertiary and Quaternary alluvial sediments. An understanding of the lateral and vertical changes in the material properties of the alluvial sediments will aid in the further development of the hydrogeologic framework and the delineation of hydrostratigraphic units and hydraulic properties required for simulating groundwater flow in the Yucca Flat area. Previously published geologic models for the alluvial sediments within Yucca Flat are based on extensive examination and categorization of drill-hole data, combined with a simple, data-driven interpolation scheme. The U.S. Geological Survey, in collaboration with Stanford University, is researching improvements to the modeling of the alluvial section, incorporating prior knowledge of geologic structure into the interpolation method and estimating the uncertainty of the modeled hydrogeologic units.

  1. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.; Lantow, Tiffany A.

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2014 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Photographs taken during inspections are included in Appendix D. The annual post-closure inspections were conducted on May 28, 2014. Maintenance was required at CAU 407. Animal burrows were backfilled and erosion repairs were performed. Vegetation monitoring was performed at CAU 407 in June 2014. The vegetation monitoring report is included in Appendix E.« less

  2. Impact of Different Standard Type A7A Drum Closure-Ring Practices on Gasket Contraction and Bolt Closure Distance– 15621

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ketusky, Edward; Blanton, Paul; Bobbitt, John H.

    The Department of Energy, the Savannah River National Laboratory, several manufacturers of specification drums, and the United States Department of Transportation (DOT) are collaborating in the development of a guidance document for DOE contractors and vendors who wish to qualify containers to DOT 7A Type A requirements. Currently, the effort is focused on DOT 7A Type A 208-liter (55-gallons) drums with a standard 12-gauge bolted closure ring. The U.S. requirements, contained in Title 49, Part 178.350 “Specification 7A; general packaging, Type A specifies a competent authority review of the packaging is not required for the transport of (Class 7) radioactivemore » material containing less than Type A quantities of radioactive material. For Type AF drums, a 4 ft. regulatory free drop must be performed, such that the drum “suffers maximum damage.” Although the actual orientation is not defined by the specification, recent studies suggest that maximum damage would result from a shallow angle top impact, where kinetic energy is transferred to the lid, ultimately causing heavy damage to the lid, or even worse, causing the lid to come off. Since each vendor develops closure recommendations/procedures for the drums they manufacture, key parameters applied to drums during closing vary based on vendor. As part of the initial phase of the collaboration, the impact of the closure variants on the ability of the drum to suffer maximum damage is investigated. Specifically, closure testing is performed varying: 1) the amount of torque applied to the closure ring bolt; and, 2) stress relief protocol, including: a) weight of hammer; and, b) orientation that the hammer hits the closure ring. After closure, the amount of drum lid gasket contraction and the distance that the closure bolt moves through the closure ring is measured.« less

  3. Advances in the Surgical Treatment of Gastroschisis.

    PubMed

    Safavi, Arash; Skarsgard, Erik D

    2015-05-01

    Gastroschisis (GS) is a structural defect of the anterior abdominal wall, usually diagnosed antenatally, that occurs with a frequency of approximately 4 per 10,000 pregnancies. Babies born with GS require neonatal intensive care and surgical management of the abdominal wall defect soon after birth. Although contemporary survival rates for GS are over 90%, these babies are at risk for significant morbidity, and require 4 to 6 weeks of costly, resource-intensive care in specialized neonatal units. Much consideration has been given to how best to treat the abdominal wall defect of GS. The traditional approach, necessitated by a need to establish enteral feeding as quickly as possible, consists of early postnatal visceral reduction and sutured abdominal closure. Advances in neonatal nutritional support have enabled the development of surgical approaches, which permit gradual visceral reduction and delayed abdominal closure. In cases where early visceral reduction cannot be achieved, delayed closure enabled by the initial placement of a prosthetic silo has been a live-saving alternative. The development of preformed silos has simplified their use and led to an interest in treating all cases with a delayed closure philosophy. Most recently, a sutureless technique of abdominal closure has been reported, which has the benefit of avoiding general anesthesia and offers other outcome improvements over sutured closure of the defect. The debate over primary closure versus silo placement and delayed closure continues to receive much attention. The goal of this article is to review historical aspects of gastroschisis closure, and then focus on current surgical techniques, including the innovative sutureless closure, with an analysis of the comparative clinical effectiveness of these approaches to treatment of the abdominal wall defect in GS.

  4. Three-dimensional mapping of equiprobable hydrostratigraphic units at the Frenchman Flat Corrective Action Unit, Nevada Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shirley, C.; Pohlmann, K.; Andricevic, R.

    1996-09-01

    Geological and geophysical data are used with the sequential indicator simulation algorithm of Gomez-Hernandez and Srivastava to produce multiple, equiprobable, three-dimensional maps of informal hydrostratigraphic units at the Frenchman Flat Corrective Action Unit, Nevada Test Site. The upper 50 percent of the Tertiary volcanic lithostratigraphic column comprises the study volume. Semivariograms are modeled from indicator-transformed geophysical tool signals. Each equiprobable study volume is subdivided into discrete classes using the ISIM3D implementation of the sequential indicator simulation algorithm. Hydraulic conductivity is assigned within each class using the sequential Gaussian simulation method of Deutsch and Journel. The resulting maps show the contiguitymore » of high and low hydraulic conductivity regions.« less

  5. Post-Closure Inspection Letter Report for Corrective Action Units on the Nevada National Security Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehleke, R. F.

    2014-05-06

    This letter serves as the post-closure inspection letter report for Corrective Action Units (CAUs) on the Nevada National Security Site for calendar year 2013. The inspections identified maintenance and repair is required at the following sites: sign and/or fence repair is necessary at CAUs 113, 137, 139, 140, 143, 262, 370, 371, 372, 374, 476, 478, 529, 542, and 560; animal burrows were identified at CAU 547; and erosion was identified at CAUs 366, 367, 383, 551, and 574. In addition, the following use restrictions were removed during 2013 and will no longer be inspected in 2014: 165, 357, andmore » 528.« less

  6. Flat epithelial atypia of the breast.

    PubMed

    Lerwill, Melinda F

    2008-04-01

    Flat epithelial atypia is a presumably neoplastic alteration of terminal duct-lobular units that is characterized by the replacement of the native luminal epithelium by ductal cells demonstrating low-grade cytologic atypia. The atypical cells maintain a "flat" pattern of growth without evidence of architectural atypicality. Morphologic, immunohistochemical, and molecular investigations support that flat epithelial atypia represents an early step in the evolution of low-grade ductal carcinomas. It is frequently seen in association with atypical ductal hyperplasia, low-grade ductal carcinoma in situ, invasive tubular carcinoma, and lobular neoplasia. The risk for subsequent breast carcinoma remains to be defined, but flat epithelial atypia likely represents a nonobligate precursor with an extended time course to progression. Certain benign alterations may superficially mimic its appearance; careful attention to cytologic and architectural characteristics can help one distinguish these unrelated entities from flat epithelial atypia.

  7. Association of land use and beach closure in the United States

    EPA Science Inventory

    Swimming in natural waters (e.g., oceans, lakes, rivers) is one of most popular recreational activities in the United States. However, exposure to pathogens (e.g., Salmonella spp., Shigella spp., Cryptosporidium, Giardia, adenovirus, norovirus) in recreational waters can lead to ...

  8. Communication strategies and timeliness of response to life critical telemetry alarms.

    PubMed

    Bonzheim, Kimberly A; Gebara, Rani I; O'Hare, Bridget M; Ellis, R Darin; Brand, Monique A; Balar, Salil D; Stockman, Rita; Sciberras, Annette M; Haines, David E

    2011-05-01

    A centralized electrocardiogram telemetry monitoring system (TMS) facilitates early identification of critical arrhythmias and acute medical decompensation. Timely intervention can only be performed if abnormalities are communicated rapidly to the direct caregiver. The study objectives were to measure effectiveness of bi-directional voice communication badges versus one-way alphanumeric pagers for telemetry alarm response and communication loop closure. A sequential observational pilot study of nursing response to TMS alarms compared communication technologies on four nursing units in a 1,061 bed tertiary care hospital with 264 TMS channels of telemetry over a 2-year period. Subsequently, the communication technologies were compared in a randomized fashion on a 68-bed progressive cardiac care unit. Caregivers were blinded to the protocol. All alarm responses were recorded during two periods using either pagers or voice communication devices. Alarm response time and closure of the communication loop were analyzed in a blinded fashion. The direct communication functionality of the badge significantly shortened the time to first contact, time to completion, and rate of closure of the communication loop in both the pilot and study phases. Median time to first contact with the communication badge was 0.5  min, compared to 1.6  min with pager communication (p < 0.0003). Communication loop closure was achieved in 100% of clinical alarms using the badge versus 19% with the pager (p < 0.0001). Communication badge technology reduced alarm time to first contact and completion as well as facilitated communication loop closures. Immediate two-way communication significantly impacted practice, alarm management, and resulted in faster bedside care.

  9. Magnetotelluric Data, Across Quartzite Ridge, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.M. Williams; B.D. Rodriguez, and T.H. Asch

    2005-11-23

    Nuclear weapons are integral to the defense of the United States. The U.S. Department of Energy, as the steward of these devices, must continue to gauge the efficacy of the individual weapons. This could be accomplished by occasional testing at the Nevada Test Site (NTS) in Nevada, northwest of Las Vegas. Yucca Flat Basin is one of the testing areas at the NTS. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow in the area subsequent to a nuclear test. Ground-water modelers would like to know more about themore » hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS) collected and processed Magnetotelluric (MT) and Audio-magnetotelluric (AMT) data at the Nevada Test Site in and near Yucca Flat to help characterize this pre-Tertiary geology. That work will help to define the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (UCCU) in the Yucca Flat area. Interpretation will include a three-dimensional (3-D) character analysis and two-dimensional (2-D) resistivity model. The purpose of this report is to release the MT soundings across Quartzite Ridge, Profiles 5, 6a, and 6b, as shown in Figure 1. No interpretation of the data is included here.« less

  10. Association of land use and its change with beach closure in ...

    EPA Pesticide Factsheets

    Land use and its change have great influences on water quality. However, their impacts on microbial contamination of beach water have been rarely investigated and their relationship with beach closure is still unknown. Here, we analyzed beach closure data obtained from 2004 to 2013 for more than 500 beaches in the United States, and examined their associations with land use around beaches in 2006 and 2011, respectively, as well as the land use change between 2011 and 2006. The results show that the number of beach closures is negatively associated with the percentages of forest, barren land, grassland and wetland, while positively associated with the percentage of urban area. The results from multi-level models also indicate the negative association with forest area but positive association with urban area and agriculture. The examination of the change of land use and the number of beach closures between 2011 and 2006 indicates that the increase in the number of beach closures is positively associated with the increase in urban (β=1.612, p<0.05) and agricultural area including pasture (β=0.098, p<0.05), but negatively associated with the increase in forest area (β= -1.789, p<0.05). The study suggests that urbanization and agriculture development near beaches have adverse effects on beach microbial water quality, while afforestation may protect beach water quality and reduce the number of beach closures. To compare differences in beach closures across the US u

  11. Closure Report for Corrective Action Unit 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada with ROTC 1, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister

    2007-09-01

    This CR provides documentation and justification for the closure of CAU 118 without further corrective action. This justification is based on process knowledge and the results of the investigative and closure activities conducted in accordance with the CAU 118 SAFER Plan: Streamlined Approach for Environmental Restoration (SAFER) Plan for CAU 118: Area 27 Super Kukla Facility, Nevada Test Site, Nevada (NNSA/NSO, 2006). The SAFER Plan provides information relating to site history as well as the scope and planning of the investigation. This CR also provides the analytical and radiological survey data to confirm that the remediation goals were met asmore » specified in the CAU 118 SAFER Plan (NNSA/NSO, 2006). The Nevada Division of Environmental Protection (NDEP) approved the CAU 118 SAFER Plan (Murphy, 2006), which recommends closure in place with use restrictions (URs).« less

  12. 2012 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada: Review of the Performance Assessments and Composite Analyses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shott, G.

    2013-03-18

    The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2012. This annual summary report presents data and conclusions from the FY 2012 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2012 include the following: Release of a special analysis for the Area 3 RWMS assessing the continuing validity of the PA and CA; Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2012; Evaluation of new or revised waste streams by special analysis; and Development of version 4.114 of the Area 5 RWMS GoldSim PA model. The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2012 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. A special analysis using the Area 3 RWMS v2.102 GoldSim PA model was prepared to update the PA results for the Area 3 RWMS in FY 2012. The special analysis concludes that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates no significant changes other than an increase in the inventory disposed. The FY 2012 PA results, generated with the Area 5 RWMS v4.114 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2012. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter CA results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Underground Test Area source term (Corrective Action Unit [CAU] 97), is scheduled for FY 2024, following the completion of the Yucca Flat CAU 97 Corrective Action Decision Document/Corrective Action Plan in FY 2016. Inclusion of the Frenchman Flat CAU 98 results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 closure report in FY 2015. Near-term R&D efforts will focus on continuing development of the Area 3 and Area 5 RWMS GoldSim PA/CA and inventory models.« less

  13. Closure Plan for Corrective Action Unit 109: U-2bu Subsidence Crater Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shannon Parsons

    1999-03-01

    The U-2bu subsidence crater, Corrective Action Unit 109, will be closed in accordance with the Resource Conservation and Recovery Act, the Nevada Division of Environmental Protection operational permit, and the Federal Facilities Agreement and Consent Order. The U-2bu subsidence crater is located in Area 2 of the Nevada Test Site. It was created in 1971 by an underground nuclear test with the name Miniata. The crater has a diameter of 288 meters (944 feet) and an approximate depth of 35 meters (115 feet). The subsidence crater was used as a land disposal unit for radioactive and hazardous waste from 1973more » to 1988. Site disposal history is supported by memorandums, letters, and personnel who worked at the Nevada Test Site at the time of active disposal. Closure activities will include the excavation and disposal of impacted soil form the tip of the crater. Upon completion of excavation, verification samples will be collected to show that lead has been removed to concentrations be low regulatory action level. The area will then be backfilled and a soil flood diversion berm will be constructed, and certified by an independent professional engineer as to having followed the approved Closure Plan.« less

  14. Considerations of the Differences between Bedded and Domal Salt Pertaining to Disposal of Heat-Generating Nuclear Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Francis D.; Kuhlman, Kristopher L.; Sobolik, Steven R.

    Salt formations hold promise for eternal removal of nuclear waste from our biosphere. Germany and the United States have ample salt formations for this purpose, ranging from flat-bedded formations to geologically mature dome structures. As both nations revisit nuclear waste disposal options, the choice between bedded, domal, or intermediate pillow formations is once again a contemporary issue. For decades, favorable attributes of salt as a disposal medium have been extoled and evaluated, carefully and thoroughly. Yet, a sense of discovery continues as science and engineering interrogate naturally heterogeneous systems. Salt formations are impermeable to fluids. Excavation-induced fractures heal as sealmore » systems are placed or natural closure progresses toward equilibrium. Engineering required for nuclear waste disposal gains from mining and storage industries, as humans have been mining salt for millennia. This great intellectual warehouse has been honed and distilled, but not perfected, for all nuances of nuclear waste disposal. Nonetheless, nations are able and have already produced suitable license applications for radioactive waste disposal in salt. A remaining conundrum is site location. Salt formations provide isolation and geotechnical barriers reestablish impermeability after waste is placed in the geology. Between excavation and closure, physical, mechanical, thermal, chemical, and hydrological processes ensue. Positive attributes for isolation in salt have many commonalities independent of the geologic setting. In some cases, specific details of the environment will affect the disposal concept and thereby define interaction of features, events and processes, while simultaneously influencing scenario development. Here we identify and discuss high-level differences and similarities of bedded and domal salt formations. Positive geologic and engineering attributes for disposal purposes are more common among salt formations than are significant differences. Developing models, testing material, characterizing processes, and analyzing performance all have overlapping application regardless of the salt formation of interest.« less

  15. Considerations of the Differences between Bedded and Domal Salt Pertaining to Disposal of Heat-Generating Nuclear Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, Francis D.; Kuhlman, Kristopher L.; Sobolik, Steven R.

    Salt formations hold promise for eternal removal of nuclear waste from our biosphere. Germany and the United States have ample salt formations for this purpose, ranging from flat-bedded formations to geologically mature dome structures. As both nations revisit nuclear waste disposal options, the choice between bedded, domal, or intermediate pillow formations is once again a contemporary issue. For decades, favorable attributes of salt as a disposal medium have been extoled and evaluated, carefully and thoroughly. Yet, a sense of discovery continues as science and engineering interrogate naturally heterogeneous systems. Salt formations are impermeable to fluids. Excavation-induced fractures heal as sealmore » systems are placed or natural closure progresses toward equilibrium. Engineering required for nuclear waste disposal gains from mining and storage industries, as humans have been mining salt for millennia. This great intellectual warehouse has been honed and distilled, but not perfected, for all nuances of nuclear waste disposal. Nonetheless, nations are able and have already produced suitable license applications for radioactive waste disposal in salt. A remaining conundrum is site location. Salt formations provide isolation, and geotechnical barriers reestablish impermeability after waste is placed in the geology. Between excavation and closure, physical, mechanical, thermal, chemical, and hydrological processes ensue. Positive attributes for isolation in salt have many commonalities independent of the geologic setting. In some cases, specific details of the environment will affect the disposal concept and thereby define interaction of features, events and processes, while simultaneously influencing scenario development. Here we identify and discuss high-level differences and similarities of bedded and domal salt formations. Positive geologic and engineering attributes for disposal purposes are more common among salt formations than are significant differences. Developing models, testing material, characterizing processes, and analyzing performance all have overlapping application regardless of the salt formation of interest.« less

  16. Radiological Monitoring Equipment For Real-Time Quantification Of Area Contamination In Soils And Facility Decommissioning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. V. Carpenter; Jay A. Roach; John R Giles

    2005-09-01

    The environmental restoration industry offers several sys¬tems that perform scan-type characterization of radiologically contaminated areas. The Idaho National Laboratory (INL) has developed and deployed a suite of field systems that rapidly scan, characterize, and analyse radiological contamination in surface soils. The base system consists of a detector, such as sodium iodide (NaI) spectrometers, a global positioning system (GPS), and an integrated user-friendly computer interface. This mobile concept was initially developed to provide precertifica¬tion analyses of soils contaminated with uranium, thorium, and radium at the Fernald Closure Project, near Cincinnati, Ohio. INL has expanded the functionality of this basic system tomore » create a suite of integrated field-deployable analytical systems. Using its engineering and radiation measurement expertise, aided by computer hardware and software support, INL has streamlined the data acquisition and analysis process to provide real-time information presented on wireless screens and in the form of coverage maps immediately available to field technicians. In addition, custom software offers a user-friendly interface with user-selectable alarm levels and automated data quality monitoring functions that validate the data. This system is deployed from various platforms, depending on the nature of the survey. The deployment platforms include a small all-terrain vehicle used to survey large, relatively flat areas, a hand-pushed unit for areas where manoeuvrability is important, an excavator-mounted system used to scan pits and trenches where personnel access is restricted, and backpack- mounted systems to survey rocky shoreline features and other physical settings that preclude vehicle-based deployment. Variants of the base system include sealed proportional counters for measuring actinides (i.e., plutonium-238 and americium-241) in building demolitions, soil areas, roadbeds, and process line routes at the Miamisburg Closure Project near Dayton, Ohio. In addition, INL supports decontamination operations at the Oak Ridge National Laboratory.« less

  17. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2013 and FY2014 (revised)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A.; Miller, Julianne J.; McCurdy, Greg D.

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff, which supports National Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closure designmore » and post-closure monitoring program.« less

  18. Unitized Nut-and-Washer Assembly

    NASA Technical Reports Server (NTRS)

    Rossi, P. J.

    1986-01-01

    Combination nut, washer, and lockwasher secures parts quickly without damaging metal finishes. Nut and lockwasher are captured by bent tabs of flat washer in this concept for unified fastener. Optional perforated tab on flat washer allows easy tagging and storage. Fastener intended for attaching leads and buses to studs on electronic equipment.

  19. 75 FR 42783 - Notice of Receipt of Complaint; Solicitation of Comments Relating to the Public Interest

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Re Certain Flat Panel Digital Televisions and Components Thereof''; the Commission is soliciting... importation of certain flat panel digital televisions and components thereof. The complaint names as..., competitive conditions in the United States economy, the production of like or directly competitive articles...

  20. Geologic map of the Bobs Flat Quadrangle, Eureka County, Nevada

    USGS Publications Warehouse

    Peters, Stephen G.

    2003-01-01

    Map Scale: 1:24,000 Map Type: colored geologic map A 1:24,000-scale, full-color geologic map of the Bobs Flat Quadrangle in Eureka County with one cross section and descriptions of 28 geologic units. Accompanying text describes the geologic history and structural geology of the quadrangle.

  1. Closure Report (CR) for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well with Errata Sheet and Certification, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Navarro Nevada Environmental Services

    The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner,more » which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.« less

  2. Columbia River Wildlife Mitigation Habitat Evaluation Procedures Report / Scotch Creek Wildlife Area, Berg Brothers, and Douglas County Pygmy Rabbit Projects.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashley, Paul R.

    1997-01-01

    This Habitat Evaluation Procedure study was conducted to determine baseline habitat units (HUs) on the Scotch Creek, Mineral Hill, Pogue Mountain, Chesaw and Tunk Valley Habitat Areas (collectively known as the Scotch Creek Wildlife Area) in Okanogan County, Sagebrush Flat and the Dormaler property in Douglas County, and the Berg Brothers ranch located in Okanogan County within the Colville Reservation. A HEP team comprised of individuals from the Washington Department of Fish and Wildlife, the Confederated Tribes of the Colville Reservation, and the Natural Resources Conservation Service (Appendix A) conducted baseline habitat surveys using the following HEP evaluation species: mulemore » deer (Odocoileus hemionus), sharp-tailed grouse (Tympanuchus phasianellus), pygmy rabbit (Brachylagus idahoensis), white-tailed deer (Odocoileus virginiana), mink (Mustela vison), Canada goose (Branta canadensis), downy woodpecker (Picoides pubescens), Lewis woodpecker (Melanerpes lewis), and Yellow warbler (Dendroica petechia). Results of the HEP analysis are listed below. General ratings (poor, marginal, fair, etc.,) are described in Appendix B. Mule deer habitat was marginal lacking diversity and quantify of suitable browse species. Sharp-tailed grouse habitat was marginal lacking residual nesting cover and suitable winter habitat Pygmy rabbit habitat was in fair condition except for the Dormaier property which was rated marginal due to excessive shrub canopy closure at some sites. This report is an analysis of baseline habitat conditions on mitigation project lands and provides estimated habitat units for mitigation crediting purposes. In addition, information from this document could be used by wildlife habitat managers to develop management strategies for specific project sites.« less

  3. The Milieu Manager: A Nursing Staffing Strategy to Reduce Observer Use in the Acute Psychiatric Inpatient Setting.

    PubMed

    Triplett, Patrick; Dearholt, Sandra; Cooper, Mary; Herzke, John; Johnson, Erin; Parks, Joyce; Sullivan, Patricia; Taylor, Karin F; Rohde, Judith

    Rising acuity levels in inpatient settings have led to growing reliance on observers and increased the cost of care. Minimizing use of observers, maintaining quality and safety of care, and improving bed access, without increasing cost. Nursing staff on two inpatient psychiatric units at an academic medical center pilot-tested the use of a "milieu manager" to address rising patient acuity and growing reliance on observers. Nursing cost, occupancy, discharge volume, unit closures, observer expense, and incremental nursing costs were tracked. Staff satisfaction and reported patient behavioral/safety events were assessed. The pilot initiatives ran for 8 months. Unit/bed closures fell to zero on both units. Occupancy, patient days, and discharges increased. Incremental nursing cost was offset by reduction in observer expense and by revenue from increases in occupancy and patient days. Staff work satisfaction improved and measures of patient safety were unchanged. The intervention was effective in reducing observation expense and improved occupancy and patient days while maintaining patient safety, representing a cost-effective and safe approach for management of acuity on inpatient psychiatric units.

  4. Remote controlled vacuum joint closure mechanism

    DOEpatents

    Doll, David W.; Hager, E. Randolph

    1986-01-01

    A remotely operable and maintainable vacuum joint closure mechanism for a noncircular aperture is disclosed. The closure mechanism includes an extendible bellows coupled at one end to a noncircular duct and at its other end to a flange assembly having sealed grooves for establishing a high vacuum seal with the abutting surface of a facing flange which includes an aperture forming part of the system to be evacuated. A plurality of generally linear arrangements of pivotally coupled linkages and piston combinations are mounted around the outer surface of the duct and aligned along the length thereof. Each of the piston/linkage assemblies is adapted to engage the flange assembly by means of a respective piston and is further coupled to a remote controlled piston drive shaft to permit each of the linkages positioned on a respective flat outer surface of the duct to simultaneously and uniformly displace a corresponding piston and the flange assembly with which it is in contact along the length of the duct in extending the bellows to provide a high vacuum seal between the movable flange and the facing flange. A plurality of latch mechanisms are also pivotally mounted on the outside of the duct. A first end of each of the latch mechanisms is coupled to a remotely controlled latch control shaft for displacing the latch mechanism about its pivot point. In response to the pivoting displacement of the latch mechanism, a second end thereof is displaced so as to securely engage the facing flange.

  5. Curvature of Double-Membrane Organelles Generated by Changes in Membrane Size and Composition

    PubMed Central

    Knorr, Roland L.; Dimova, Rumiana; Lipowsky, Reinhard

    2012-01-01

    Transient double-membrane organelles are key players in cellular processes such as autophagy, reproduction, and viral infection. These organelles are formed by the bending and closure of flat, double-membrane sheets. Proteins are believed to be important in these morphological transitions but the underlying mechanism of curvature generation is poorly understood. Here, we describe a novel mechanism for this curvature generation which depends primarily on three membrane properties: the lateral size of the double-membrane sheets, the molecular composition of their highly curved rims, and a possible asymmetry between the two flat faces of the sheets. This mechanism is evolutionary advantageous since it does not require active processes and is readily available even when resources within the cell are restricted as during starvation, which can induce autophagy and sporulation. We identify pathways for protein-assisted regulation of curvature generation, organelle size, direction of bending, and morphology. Our theory also provides a mechanism for the stabilization of large double-membrane sheet-like structures found in the endoplasmic reticulum and in the Golgi cisternae. PMID:22427874

  6. Waves plus currents at a right angle: The rippled bed case

    NASA Astrophysics Data System (ADS)

    Faraci, C.; Foti, E.; Musumeci, R. E.

    2008-07-01

    The present paper deals with wave plus current flow over a fixed rippled bed. More precisely, modifications of the current profiles due to the superimposition of orthogonal cylindrical waves have been investigated experimentally. Since the experimental setup permitted only the wave dominated regime to be investigated (i.e., the regime where orbital velocity is larger than current velocity), also a numerical k-ɛ turbulence closure model has been developed in order to study a wider range of parameters, thus including the current dominated regime (i.e., where current velocity is larger than wave orbital one). In both cases a different response with respect to the flat bed case has been found. Indeed, in the flat bed case laminar wave boundary layers in a wave dominated regime induce a decrease in bottom shear stresses, while the presence of a rippled bed behaves as a macroroughness, which causes the wave boundary layer to become turbulent and therefore the current velocity near the bottom to be smaller than the one in the case of current only, with a consequent increase in the current bottom roughness.

  7. Site vegetation report: Terrestrial vegetation survey (1993--1995) for the Rocky Flats Environmental Technology Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-06-01

    The Ecological Monitoring Program (EcMP) was designed to investigate the long-term ecological trends in terrestrial and aquatic ecosystems at the US Department of energy`s (DOE`s) Rocky Flats Environmental Technology Site (Site) (DOE 1993). Field sampling was conducted during 1993, 1994, and 1995, until the program was terminated in late 1995. This report presents the terrestrial vegetation data that were gathered by the EcMP. The site is located on the Colorado Piedmont, east of the Front Range, between Boulder and Golden, approximately 25 km (16 miles) northwest of Denver. The topography and proximity of the Site to the mountain front resultmore » in an interesting mixture of prairie and mountain plant species. The Site is one of the few large, relatively undisturbed areas of its kind that remains along the Colorado Piedmont. Until 1989, the primary mission of the Site was the production of nuclear weapons components (DOE 1993). After production ceased, Site personnel shifted their focus to cleanup and closure.« less

  8. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure - Using Technology to Prepare for the Next Pandemic.

    PubMed

    Rainey, Jeanette J; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O'Sullivan, Megan

    During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10-18, 2012 teachers' strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process.

  9. Online Work Force Analyzes Social Media to Identify Consequences of an Unplanned School Closure – Using Technology to Prepare for the Next Pandemic

    PubMed Central

    Rainey, Jeanette J.; Kenney, Jasmine; Wilburn, Ben; Putman, Ami; Zheteyeva, Yenlik; O’Sullivan, Megan

    2016-01-01

    Background During an influenza pandemic, the United States Centers for Disease Control and Prevention (CDC) may recommend school closures. These closures could have unintended consequences for students and their families. Publicly available social media could be analyzed to identify the consequences of an unplanned school closure. Methods As a proxy for an unplanned, pandemic-related school closure, we used the district-wide school closure due to the September 10–18, 2012 teachers’ strike in Chicago, Illinois. We captured social media posts about the school closure using the Radian6 social media-monitoring platform. An online workforce from Amazon Mechanical Turk categorized each post into one of two groups. The first group included relevant posts that described the impact of the closure on students and their families. The second group included irrelevant posts that described the political aspects of the strike or topics unrelated to the school closure. All relevant posts were further categorized as expressing a positive, negative, or neutral sentiment. We analyzed patterns of relevant posts and sentiment over time and compared our findings to household surveys conducted after other unplanned school closures. Results We captured 4,546 social media posts about the district-wide school closure using our search criteria. Of these, 930 (20%) were categorized as relevant by the online workforce. Of the relevant posts, 619 (67%) expressed a negative sentiment, 51 (5%) expressed a positive sentiment, and 260 (28%) were neutral. The number of relevant posts, and especially those with a negative sentiment, peaked on day 1 of the strike. Negative sentiment expressed concerns about childcare, missed school lunches, and the lack of class time for students. This was consistent with findings from previously conducted household surveys. Conclusion Social media are publicly available and can readily provide information on the impact of an unplanned school closure on students and their families. Using social media to assess the impact of an unplanned school closure due to a public health event would be informative. An online workforce can effectively assist with the review process. PMID:27655229

  10. Effects of supplemental vibrational force on space closure, treatment duration, and occlusal outcome: A multicenter randomized clinical trial.

    PubMed

    DiBiase, Andrew T; Woodhouse, Neil R; Papageorgiou, Spyridon N; Johnson, Nicola; Slipper, Carmel; Grant, James; Alsaleh, Maryam; Khaja, Yousef; Cobourne, Martyn T

    2018-04-01

    A multicenter parallel 3-arm randomized clinical trial was carried out in 3 university hospitals in the United Kingdom to investigate the effect of supplemental vibratory force on space closure and treatment outcome with fixed appliances. Eighty-one subjects less than 20 years of age with mandibular incisor irregularity undergoing extraction-based fixed appliance treatment were randomly allocated to supplementary (20 minutes/day) use of an intraoral vibrational device (AcceleDent; OrthoAccel Technologies, Houston, Tex) (n = 29), an identical nonfunctional (sham) device (n = 25), or fixed-appliance only (n = 27). Space closure in the mandibular arch was measured from dental study casts taken at the start of space closure, at the next appointment, and at completion of space closure. Final records were taken at completion of treatment. Data were analyzed blindly on a per-protocol basis with descriptive statistics, 1-way analysis of variance, and linear regression modeling with 95% confidence intervals. Sixty-one subjects remained in the trial at start of space closure, with all 3 groups comparable for baseline characteristics. The overall median rate of initial mandibular arch space closure (primary outcome) was 0.89 mm per month with no difference for either the AcceleDent group (difference, -0.09 mm/month; 95% CI, -0.39 to 0.22 mm/month; P = 0.57) or the sham group (difference, -0.02 mm/month; 95% CI, -0.32 to 0.29 mm/month; P = 0.91) compared with the fixed only group. Similarly, no significant differences were identified between groups for secondary outcomes, including overall treatment duration (median, 18.6 months; P >0.05), number of visits (median, 12; P >0.05), and percentage of improvement in the Peer Assessment Rating (median, 90.0%; P >0.05). Supplemental vibratory force during orthodontic treatment with fixed appliances does not affect space closure, treatment duration, total number of visits, or final occlusal outcome. NCT02314975. The protocol was not published before trial commencement. AcceleDent units were donated by OrthoAccel Technologies; no contribution to the conduct or the writing of this study was made by the manufacturer. Copyright © 2017 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.

  11. Urethral pressure reflectometry during intra-abdominal pressure increase-an improved technique to characterize the urethral closure function in continent and stress urinary incontinent women.

    PubMed

    Saaby, Marie-Louise; Klarskov, Niels; Lose, Gunnar

    2013-11-01

    to assess the urethral closure function by urethral pressure reflectometry (UPR) during intra-abdominal pressure-increase in SUI and continent women. Twenty-five urodynamically proven SUI women and eight continent volunteer women were assessed by ICIQ-SF, pad-weighing test, incontinence diary, and UPR. UPR was conducted during resting and increased intra-abdominal pressure (P(Abd)) by straining. Related values of P(Abd) and urethral opening pressure (P(o)) were plotted into an abdomino-urethral pressuregram. Linear regression of the values was conducted, and the slope of the line ("APIR") and the intercept with the y-axis found. By the equation of the line, Po was calculated for various values of P(Abd), for example, 50 cm H2O (P(o-Abd 50)). The resting P(o) (P(o-rest)) and APIR, respectively, significantly differed in SUI and continent women but could not separate the two groups. The urethral closure equation (UCE) based on P(o-rest) and APIR provided a more detailed characterization of a woman's closure function based on the permanent closure forces (primarily generated by the urethral sphincteric unit) and the adjunctive closure forces (primarily generated by the support system). P(o-Abd 50) and UCE, respectively, which express the combined permanent and adjunctive closure forces and estimate the efficiency of the closure function, separated SUI and continent women and were highly significantly negatively correlated with ICIQ-SF, pad test, and the number of incontinence episodes. New parameters for characterization of the urethral closure function and possible dysfunctions and its efficiency were provided. P(o-Abd 50) and UCE may be used as diagnostic tests and severity measures. © 2013 Wiley Periodicals, Inc.

  12. 75 FR 62566 - Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...)] Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia AGENCY: United... antidumping duty investigation on hot-rolled steel from Russia. SUMMARY: The Commission hereby gives notice of... suspended investigation on hot-rolled steel from Russia would be likely to lead to continuation or...

  13. 75 FR 16504 - Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ...)] Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia AGENCY: United... investigation on hot-rolled steel from Russia. SUMMARY: The Commission hereby gives notice that it has...-rolled steel from Russia would be likely to lead to continuation or recurrence of material injury...

  14. 75 FR 42782 - Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ...)] Hot-Rolled Flat-Rolled Carbon-Quality Steel Products From Brazil, Japan, and Russia AGENCY: United... Brazil and Japan, and the suspended investigation on hot-rolled steel from Russia. SUMMARY: The... Japan, and the suspended investigation on hot-rolled steel from Russia would be likely to lead to...

  15. Analytical Proof That There is no Effect of Confinement or Curvature on the Maxwell-Boltzmann Collision Frequency

    NASA Astrophysics Data System (ADS)

    Carnio, Brett N.; Elliott, Janet A. W.

    2014-08-01

    The number of Maxwell-Boltzmann particles that hit a flat wall in infinite space per unit area per unit time is a well-known result. As new applications are arising in micro and nanotechnologies there are a number of situations in which a rarefied gas interacts with either a flat or curved surface in a small confined geometry. Thus, it is necessary to prove that the Maxwell-Boltzmann collision frequency result holds even if a container's dimensions are on the order of nanometers and also that this result is valid for both a finite container with flat walls (a rectangular container) and a finite container with a curved wall (a cylindrical container). An analytical proof confirms that the Maxwell-Boltzmann collision frequencies for either a finite rectangular container or a finite cylindrical container are both equal to the well-known result obtained for a flat wall in infinite space. A major aspect of this paper is the introduction of a mathematical technique to solve the arising infinite sum of integrals whose integrands depend on the Maxwell-Boltzmann velocity distribution.

  16. Deep resistivity structure of Yucca Flat, Nevada Test Site, Nevada

    USGS Publications Warehouse

    Asch, Theodore H.; Rodriguez, Brian D.; Sampson, Jay A.; Wallin, Erin L.; Williams, Jackie M.

    2006-01-01

    The Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office are addressing groundwater contamination resulting from historical underground nuclear testing through the Environmental Management program and, in particular, the Underground Test Area project. One issue of concern is the nature of the somewhat poorly constrained pre Tertiary geology and its effects on ground-water flow in the area adjacent to a nuclear test. Ground water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Yucca Flat Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey, supported by the DOE and NNSA-NSO, collected and processed data from 51 magnetotelluric (MT) and audio-magnetotelluric (AMT) stations at the Nevada Test Site in and near Yucca Flat to assist in characterizing the pre-Tertiary geology in that area. The primary purpose was to refine the character, thickness, and lateral extent of pre Tertiary confining units. In particular, a major goal has been to define the upper clastic confining unit (late Devonian - Mississippian-age siliciclastic rocks assigned to the Eleana Formation and Chainman Shale) in the Yucca Flat area. The MT and AMT data have been released in separate USGS Open File Reports. The Nevada Test Site magnetotelluric data interpretation presented in this report includes the results of detailed two-dimensional (2 D) resistivity modeling for each profile (including alternative interpretations) and gross inferences on the three dimensional (3 D) character of the geology beneath each station. The character, thickness, and lateral extent of the Chainman Shale and Eleana Formation that comprise the Upper Clastic Confining Unit are generally well determined in the upper 5 km. Inferences can be made regarding the presence of the Lower Clastic Confining Unit at depths below 5 km. Large fault structures such as the CP Thrust fault, the Carpetbag fault, and the Yucca fault that cross Yucca Flat are also discernable as are other smaller faults. The subsurface electrical resistivity distribution and inferred geologic structures determined by this investigation should help constrain the hydrostratigraphic framework model that is under development.

  17. SU-F-T-67: Correction Factors for Monitor Unit Verification of Clinical Electron Beams

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haywood, J

    Purpose: Monitor units calculated by electron Monte Carlo treatment planning systems are often higher than TG-71 hand calculations for a majority of patients. Here I’ve calculated tables of geometry and heterogeneity correction factors for correcting electron hand calculations. Method: A flat water phantom with spherical volumes having radii ranging from 3 to 15 cm was created. The spheres were centered with respect to the flat water phantom, and all shapes shared a surface at 100 cm SSD. D{sub max} dose at 100 cm SSD was calculated for each cone and energy on the flat phantom and for the spherical volumesmore » in the absence of the flat phantom. The ratio of dose in the sphere to dose in the flat phantom defined the geometrical correction factor. The heterogeneity factors were then calculated from the unrestricted collisional stopping power for tissues encountered in electron beam treatments. These factors were then used in patient second check calculations. Patient curvature was estimated by the largest sphere that aligns to the patient contour, and appropriate tissue density was read from the physical properties provided by the CT. The resulting MU were compared to those calculated by the treatment planning system and TG-71 hand calculations. Results: The geometry and heterogeneity correction factors range from ∼(0.8–1.0) and ∼(0.9–1.01) respectively for the energies and cones presented. Percent differences for TG-71 hand calculations drop from ∼(3–14)% to ∼(0–2)%. Conclusion: Monitor units calculated with the correction factors typically decrease the percent difference to under actionable levels, < 5%. While these correction factors work for a majority of patients, there are some patient anatomies that do not fit the assumptions made. Using these factors in hand calculations is a first step in bringing the verification monitor units into agreement with the treatment planning system MU.« less

  18. Military Bases: Opportunities Exist to Improve Future Base Realignment and Closure Rounds

    DTIC Science & Technology

    2013-03-01

    Operational Army—realigns Fort Bliss , TX; Fort Hood, TX; Fort Riley, KS; Fort Campbell, KY; and Fort Sill, OK to include rebasing of units from overseas to...Committee on Appropriations United States Senate The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military

  19. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2016.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consisted of a containment cell, two treatment systems, four associated waste staging and storage areas, and support areas; all were used for management of remediation wastes between 1997 and 2003.

  20. 77 FR 22678 - Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-17

    .... 110707371-2136-02] RIN 0648- XB145 Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries; Closure of the Trimester 1 Longfin Squid Fishery AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION...

  1. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  2. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  3. 40 CFR 239.6 - Permitting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CFR part 257, subpart B or 40 CFR part 258 federal revised criteria. (e) For municipal solid waste... solid waste landfill units shall have a permit incorporating the conditions identified in paragraph (e... solid waste landfill units which achieve compliance with 40 CFR part 258, subpart E; (vi) Closure and...

  4. Corrective Action Management Unit Report of Post-Closure Care Activities Calendar Year 2017.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziock, Robert; Little, Bonnie Colleen

    The Corrective Action Management Unit (CAMU) at Sandia National Laboratories, New Mexico (SNL/NM) consists of a containment cell and ancillary systems that underwent regulatory closure in 2003 in accordance with the Closure Plan in Appendix D of the Class 3 Permit Modification (SNL/NM September 1997). The containment cell was closed with wastes in place. On January 27, 2015, the New Mexico Environment Department (NMED) issued the Hazardous Waste Facility Operating Permit (Permit) for Sandia National Laboratories (NMED January 2015). The Permit became effective February 26, 2015. The CAMU is undergoing post-closure care in accordance with the Permit, as revised andmore » updated. This CAMU Report of Post-Closure Care Activities documents all activities and results for Calendar Year (CY) 2017 as required by the Permit. The CAMU containment cell consists of engineered barriers including a cover system, a bottom liner with a leachate collection and removal system (LCRS), and a vadose zone monitoring system (VZMS). The VZMS provides information on soil conditions under the cell for early leak detection. The VZMS consists of three monitoring subsystems, which include the primary subliner (PSL), a vertical sensor array (VSA), and the Chemical Waste Landfill (CWL) sanitary sewer (CSS) line. The PSL, VSA, and CSS monitoring subsystems are monitored quarterly for soil moisture concentration, the VSA is monitored quarterly for soil temperature, and the VSA and CSS monitoring subsystems are monitored annually for volatile organic compound (VOC) concentrations in the soil vapor at various depths. Baseline data for the soil moisture, soil temperature, and soil vapor were established between October 2003 and September 2004.« less

  5. Is size the only determinant of delayed abdominal closure in pediatric liver transplant?

    PubMed

    Khorsandi, Shirin Elizabeth; Day, Arthur William Raven; Cortes, Miriam; Deep, Akash; Dhawan, Anil; Vilca-Melendez, Hector; Heaton, Nigel

    2017-03-01

    The aim was to determine the factors associated with the use of delayed abdominal closure in pediatric liver transplantation (LT) and whether this affected outcome. From a prospectively maintained database, transplants performed in children (≤18 years) were identified (October 2010 to March 2015). Primary abdominal closure was defined as mass closure performed at time of transplant. Delayed abdominal closure was defined as mass closure not initially performed at the same time as transplant; 230 children underwent LT. Of these, 176 (76.5%) had primary closure. Age was similar between the primary and delayed groups (5.0 ± 4.9 versus 3.9 ± 5.0 years; P = 0.13). There was no difference in the graft-to-recipient weight ratio (GRWR) in the primary and delayed groups (3.4 ± 2.8 versus 4.1 ± 2.1; P = 0.12). Children with acute liver failure (ALF) were more likely to experience delayed closure then those with chronic liver disease (CLD; P < 0.001). GRWR was similar between the ALF and CLD (3.4 ± 2.4 versus 3.6 ± 2.7; P = 0.68). Primary closure children had a shorter hospital stay (P < 0.001), spent fewer days in pediatric intensive care unit (PICU; P = 0.001), and required a shorter duration of ventilation (P < 0.001). Vascular complications (arterial and venous) were similar (primary 8.2% versus delayed 5.6%; P = 0.52). Graft (P = 0.42) and child survival (P = 0.65) in the primary and delayed groups were similar. Considering timing of mass closure after transplant, patients in the early delayed closure group (<6 weeks) were found to experience a shorter time of ventilation (P = 0.03) and in PICU (P = 0.003). In conclusion, ALF was the main determinant of delayed abdominal closure rather than GRWR. The optimal time for delayed closure is within 6 weeks. The use of delayed abdominal closure does not adversely affect graft/child survival. Liver Transplantation 23 352-360 2017 AASLD. © 2016 by the American Association for the Study of Liver Diseases.

  6. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 98: Frenchman Flat, Nevada National Security Site, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irene Farnham and Sam Marutzky

    2011-07-01

    This CADD/CAP follows the Corrective Action Investigation (CAI) stage, which results in development of a set of contaminant boundary forecasts produced from groundwater flow and contaminant transport modeling of the Frenchman Flat CAU. The Frenchman Flat CAU is located in the southeastern portion of the NNSS and comprises 10 underground nuclear tests. The tests were conducted between 1965 and 1971 and resulted in the release of radionuclides in the subsurface in the vicinity of the test cavities. Two important aspects of the corrective action process are presented within this CADD/CAP. The CADD portion describes the results of the Frenchman Flatmore » CAU data-collection and modeling activities completed during the CAI stage. The corrective action objectives and the actions recommended to meet the objectives are also described. The CAP portion describes the corrective action implementation plan. The CAP begins with the presentation of CAU regulatory boundary objectives and initial use restriction boundaries that are identified and negotiated by NNSA/NSO and the Nevada Division of Environmental Protection (NDEP). The CAP also presents the model evaluation process designed to build confidence that the flow and contaminant transport modeling results can be used for the regulatory decisions required for CAU closure. The first two stages of the strategy have been completed for the Frenchman Flat CAU. A value of information analysis and a CAIP were developed during the CAIP stage. During the CAI stage, a CAIP addendum was developed, and the activities proposed in the CAIP and addendum were completed. These activities included hydrogeologic investigation of the underground testing areas, aquifer testing, isotopic and geochemistry-based investigations, and integrated geophysical investigations. After these investigations, a groundwater flow and contaminant transport model was developed to forecast contaminant boundaries that enclose areas potentially exceeding the Safe Drinking Water Act radiological standards at any time within 1,000 years. An external peer review of the groundwater flow and contaminant transport model was completed, and the model was accepted by NDEP to allow advancement to the CADD/CAP stage. The CADD/CAP stage focuses on model evaluation to ensure that existing models provide adequate guidance for the regulatory decisions regarding monitoring and institutional controls. Data-collection activities are identified and implemented to address key uncertainties in the flow and contaminant transport models. During the CR stage, final use restriction boundaries and CAU regulatory boundaries are negotiated and established; a long-term closure monitoring program is developed and implemented; and the approaches and policies for institutional controls are initiated. The model evaluation process described in this plan consists of an iterative series of five steps designed to build confidence in the site conceptual model and model forecasts. These steps are designed to identify data-collection activities (Step 1), document the data-collection activities in the 0CADD/CAP (Step 2), and perform the activities (Step 3). The new data are then assessed; the model is refined, if necessary; the modeling results are evaluated; and a model evaluation report is prepared (Step 4). The assessments are made by the modeling team and presented to the pre-emptive review committee. The decision is made by the modeling team with the assistance of the pre-emptive review committee and concurrence of NNSA/NSO to continue data and model assessment/refinement, recommend additional data collection, or recommend advancing to the CR stage. A recommendation to advance to the CR stage is based on whether the model is considered to be sufficiently reliable for designing a monitoring system and developing effective institutional controls. The decision to advance to the CR stage or to return to step 1 of the process is then made by NDEP (Step 5).« less

  7. Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites, Nevada Test Site, Nevada with Errata Sheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NNSA /NV

    2002-11-12

    This Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 356, Mud Pits and Disposal Sites, in accordance with the Federal Facility Agreement and Consent Order. This CAU is located in Areas 3 and 20 of the Nevada Test Site (NTS) approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 356 consists of seven Corrective Action Sites (CASs): 03-04-01, Area 3 Change House Septic System; 03-09-01, Mud Pit Spill Over; 03-09-03, Mud Pit; 03-09-04, Mud Pit; 03-09-05, Mud Pit; 20-16-01, Landfill; and 20-22-21, Drums. This CR identifies and rationalizes the U.S. Department of Energy (DOE), Nationalmore » Nuclear Security Administration Nevada Operations Office's (NNSA/NV's) recommendation that no further corrective action and closure in place is deemed necessary for CAU 356. This recommendation is based on the results of field investigation/closure activities conducted November 20, 2001, through January 3, 2002, and March 11 to 14, 2002. These activities were conducted in accordance with the Streamlined Approach for Environmental Restoration Plan (SAFER) for CAU 356. For CASs 03-09-01, 03-09-03, 20-16-01, and 22-20-21, analytes detected in soil during the corrective action investigation were evaluated against Preliminary Action Levels (PALs) and it was determined that no Contaminants of Concern (COCs) were present. Therefore, no further action is necessary for the soil at these CASs. For CASs 03-04-01, 03-09-04, and 03-09-05, analytes detected in soil during the corrective action investigation were evaluated against PALs and identifies total petroleum hydrocarbons (TPHs) and radionuclides (i.e., americium-241 and/or plutonium 239/240) as COCs. The nature, extent, and concentration of the TPH and radionuclide COCs were bounded by sampling and shown to be relatively immobile. Therefore, closure in place is recommended for these CASs in CAU 356. Further, use restrictions are not required at this CAU beyond the NTS use restrictions identified in the SAFER Plan. In addition, the septic tank associated with CAU 356 will be closed in accordance with applicable regulations.« less

  8. Closure Report for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss and Catherine Birney

    2011-05-01

    This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 544: Cellars, Mud Pits, and Oil Spills, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 544 are located within Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada National Security Site. Corrective Action Unit 544 comprises the following CASs: • 02-37-08,more » Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mud Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for CASs within CAU 544 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 544 issued by the Nevada Division of Environmental Protection.« less

  9. Transcatheter closure of patent foramen ovale for secondary prevention of ischemic stroke: Quantitative synthesis of pooled randomized trial data.

    PubMed

    Hakeem, Abdul; Cilingiroglu, Mehmet; Katramados, Angelos; Boudoulas, Konstantinos Dean; Iliescu, Cezar; Gundogdu, Betul; Marmagkiolis, Konstantinos

    2018-01-14

    To evaluate the safety and efficacy of percutaneous device closure of patent foramen ovale (PFO) for secondary prevention of ischemic stroke BACKGROUND: Stroke remains the leading cause of serious long-term disability in the United States. The effectiveness of a percutaneous PFO closure in the prevention of recurrent cryptogenic strokes has not been established. We performed a literature search using PubMed, EMBASE, Cochrane Central Register of Controlled Trials, Google Scholar, and Internet-based sources from January 2003 to September 2017. Randomized controlled trails (RCTs) comparing percutaneous PFO closure to medical therapy alone. Five RCTs (CLOSURE I, PC Trial, REDUCE, RESPECT, and CLOSE) with 1,829 patients in the device group and 1,611 patients in the medical group met inclusion criteria. The cumulative incidence of recurrent stroke was 2.02% in the PFO closure arm and 4.4% in the medical therapy group (RR 0.42, 95%CI 0.20, 0.91; P = 0.03). There was no difference in the incidence of death [0.7% vs. 0.9%; RR 0.76 (95% CI 0.35, 1.64), P = 0.49] or adverse events during the follow-up period [24.6% vs. 23.7% (RR 1.03; 95% CI 0.91, 1.16), P = 0.65] between the closure and medical therapy groups. Incidence of atrial fibrillation was significantly higher in closure group compared to medical therapy [4% vs. 0.6% (RR 4.73; 95% CI 2.09, 10.70), P = 0.0002]. The comparative effectiveness of PFO closure (compared to medical therapy) was significantly more pronounced in those younger than 45 years, males, larger shunts and disc design platforms (P < 0.05). Based on the results of this analysis of randomized trial data, percutaneous PFO closure appears to be a safe and effective therapeutic option for the secondary prevention of ischemic stroke in patients with PFO and cryptogenic stroke. © 2018 Wiley Periodicals, Inc.

  10. Rock Slope Design Criteria

    DOT National Transportation Integrated Search

    2010-06-01

    Based on the stratigraphy and the type of slope stability problems, the flat lying, Paleozoic age, sedimentary : rocks of Ohio were divided into three design units: 1) competent rock design unit consisting of sandstones, limestones, : and siltstones ...

  11. Water supply for the Nuclear Rocket Development Station at the U.S. Atomic Energy Commission's Nevada Test Site

    USGS Publications Warehouse

    Young, Richard Arden

    1972-01-01

    The Nuclear Rocket Development Station, in Jackass Flats, occupies about 123 square miles in the southwestern part of the U.S. Atomic Energy Commission's Nevada Test Site. Jackass Flats, an intermontane valley bordered by highlands on all sides except for a drainage outlet in the southwestern corner, has an average annual rainfall of 4 inches. Jackass Flats is underlain by alluvium, colluvium, and volcanic rocks of Cenozoic age and, at greater depth, by sedimentary rocks of Paleozoic age. The alluvium and the colluvium lie above the saturated zone throughout nearly all of Jackass Flats. The Paleozoic sedimentary rocks contain limestone and dolomite units that are excellent water producers elsewhere ; however, these units are too deep in Jackass Flats to be economic sources of water. The only important water-producing unit known in the vicinity of the Nuclear Rocket Development Station is a welded-tuff aquifer, the Topopah Spring Member of the Paintbrush Tuff, which receives no significant recharge. This member contains about 500 feet of highly fractured rock underlying an area 11 miles long and 3 miles wide in western Jackass Flats. Permeability of the aquifer is derived mostly from joints and fractures; however, some permeability may be derived from gas bubbles in the upper part of the unit. Transmissivity, obtained from pumping tests, ranges from 68,000 to 488,000 gallons per day per foot. Volume of the saturated part of the aquifer is about 3.5 cubic miles, and the average specific yield probably ranges from 1 to 5 percent. The volume of ground water in storage is probably within the range of 37-187 billion gallons. This large amount of water should be sufficient to supply the needs of the Nuclear Rocket Development Station for many years. Water at the Nuclear Rocket Development Station is used for public supply, construction, test-cell coolant, exhaust cooling, and thermal shielding during nuclear reactor and engine testing, and washdown. Present (1967) average consumption of water is 520,000 gallons per day--all supplied by one well. This supply well and a standby well have a production capability of 1.6 million gallons per day--adequate for present needs. Water in the welded-tuff aquifer is of the sodium bicarbonate type. Dissolved-solids content of the water in Jackass Flats is in the general range 230 milligrams per liter in the western part to 890 milligrams per liter in the eastern part.

  12. Preliminary hydrogeologic investigation of the Maxey Flats radioactive waste burial site, Fleming County, Kentucky

    USGS Publications Warehouse

    Zehner, Harold H.

    1979-01-01

    Burial trenches at the Maxey Flats radioactive waste burial site , Fleming County, Ky., cover an area of about 0.03 square mile, and are located on a plateau, about 300 to 400 feet above surrounding valleys. Although surface-water characteristics are known, little information is available regarding the ground-water hydrology of the Maxey Flats area. If transport of radionuclides from the burial site were to occur, water would probably be the principal mechanism of transport by natural means. Most base flow in streams around the burial site is from valley alluvium, and from the mantle of regolith, colluvium, and soil partially covering adjacent hills. Very little base flow is due to ground-water flow from bedrock. Most water in springs is from the mantle, rather than from bedrock. Rock units underlying the Maxey Flats area are, in descending order, the Nancy and Farmers Members of the Borden Formation, Sunbury, Bedford, and Ohio Shales, and upper part of the Crab Orchard Formation. These units are mostly shales, except for the Farmers Member, which is mostly sandstone. Total thickness of the rocks is about 320 feet. All radioactive wastes are buried in the Nancy Member. Most ground-water movement in bedrock probably occurs in fractures. The ground-water system at Maxey Flats is probably unconfined, and recharge occurs by (a) infiltration of rainfall into the mantle, and (b) vertical, unsaturated flow from the saturated regolith on hilltops to saturated zones in the Farmers Member and Ohio Shale. Data are insufficient to determine if saturated zones exist in other rock units. The upper part of the Crab Orchard Formation is probably a hydrologic boundary, with little ground-water flow through the formation. (USGS)

  13. 78 FR 64473 - Certain Hot-Rolled Carbon Steel Flat Products From the People's Republic of China: Final No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... DEPARTMENT OF COMMERCE International Trade Administration [A-570-865] Certain Hot-Rolled Carbon... review of the antidumping duty order on certain hot- rolled carbon steel flat products (``hot-rolled... of subject merchandise to the United States during the POR. \\1\\ See Certain Hot-Rolled Carbon Steel...

  14. Generation of flat wideband chaos with suppressed time delay signature by using optical time lens.

    PubMed

    Jiang, Ning; Wang, Chao; Xue, Chenpeng; Li, Guilan; Lin, Shuqing; Qiu, Kun

    2017-06-26

    We propose a flat wideband chaos generation scheme that shows excellent time delay signature suppression effect, by injecting the chaotic output of general external cavity semiconductor laser into an optical time lens module composed of a phase modulator and two dispersive units. The numerical results demonstrate that by properly setting the parameters of the driving signal of phase modulator and the accumulated dispersion of dispersive units, the relaxation oscillation in chaos can be eliminated, wideband chaos generation with an efficient bandwidth up to several tens of GHz can be achieved, and the RF spectrum of generated chaotic signal is nearly as flat as uniform distribution. Moreover, the periodicity of chaos induced by the external cavity modes can be simultaneously destructed by the optical time lens module, based on this the time delay signature can be completely suppressed.

  15. The Hanikoda Method: 3-layered Negative Pressure Wound Therapy in Wound Bed Preparation.

    PubMed

    Chik, Ian; Kelly, Enda G; Jarmin, Razman; Imran, Farrah-Hani

    2016-10-01

    Negative pressure wound therapy is a widely used method of wound dressing with various commercially available brands. The authors created the Hanikoda Method (HM) for effective wound bed preparation or definite wound closure. In this case series, the authors discuss 8 different wound cases that presented to their Plastics Unit from January 2014 to June 2015. Patients with traumatic or infected wounds were selected for treatment with the HM. Selected patients underwent multiple cycles of this method until their wounds were ready for definite wound closure or the wounds had closed by secondary closure. The purpose of any wound dressing is to encourage epithelization while ensuring no factors impede wound healing. An additional benefit is to reduce wound bed size so that it may close by secondary intention or require less skin graft coverage. Each layer of the dressing is described, along with its function in wound bed preparation or in closure. The HM facilitates reduction of wound size, wound bed preparation, and overall management.

  16. Thermo-fluid-dynamics of turbulent boundary layer over a moving continuous flat sheet in a parallel free stream

    NASA Astrophysics Data System (ADS)

    Afzal, Bushra; Noor Afzal Team; Bushra Afzal Team

    2014-11-01

    The momentum and thermal turbulent boundary layers over a continuous moving sheet subjected to a free stream have been analyzed in two layers (inner wall and outer wake) theory at large Reynolds number. The present work is based on open Reynolds equations of momentum and heat transfer without any closure model say, like eddy viscosity or mixing length etc. The matching of inner and outer layers has been carried out by Izakson-Millikan-Kolmogorov hypothesis. The matching for velocity and temperature profiles yields the logarithmic laws and power laws in overlap region of inner and outer layers, along with friction factor and heat transfer laws. The uniformly valid solution for velocity, Reynolds shear stress, temperature and thermal Reynolds heat flux have been proposed by introducing the outer wake functions due to momentum and thermal boundary layers. The comparison with experimental data for velocity profile, temperature profile, skin friction and heat transfer are presented. In outer non-linear layers, the lowest order momentum and thermal boundary layer equations have also been analyses by using eddy viscosity closure model, and results are compared with experimental data. Retired Professor, Embassy Hotel, Rasal Ganj, Aligarh 202001 India.

  17. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  18. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  19. 40 CFR 267.115 - After I stop operating, how long until I must close?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES...? (a) Within 90 days after the final volume of hazardous waste is sent to a unit, you must treat or remove from the unit all hazardous wastes following the approved closure plan. (b) You must complete...

  20. 77 FR 52262 - Fisheries of the Northeastern United States; Summer Flounder Fishery; Commercial Quota Harvested...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    .... 111220786-1781-01] RIN 0648-XC176 Fisheries of the Northeastern United States; Summer Flounder Fishery...; closure. SUMMARY: NMFS announces that the 2012 summer flounder commercial quota allocated to the... summer flounder fishery may not land summer flounder in Massachusetts for the remainder of calendar year...

  1. 75 FR 52890 - Fisheries of the Northeastern United States; Summer Flounder Fishery; Commercial Quota Harvested...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    .... 0908191244-91427ndash;02] RIN 0648-XY35 Fisheries of the Northeastern United States; Summer Flounder Fishery...; closure. SUMMARY: NMFS announces that the 2010 summer flounder commercial quota allocated to the... summer flounder fishery may not land summer flounder in Massachusetts for the remainder of calendar year...

  2. 78 FR 51096 - Fisheries of the Northeastern United States; Summer Flounder Fishery; Commercial Quota Harvested...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-20

    .... 111220786-1781-01] RIN 0648-XC811 Fisheries of the Northeastern United States; Summer Flounder Fishery...; closure. SUMMARY: NMFS announces that the 2013 summer flounder commercial quota allocated to the... summer flounder fishery may not land summer flounder in Massachusetts for the remainder of calendar year...

  3. 75 FR 44144 - Washington: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ....19. 400(3)(c)(xiii)(A) Correction--the 265.300 Subpart word N--Landfills, carbonaceous related... recycling Subpart G exception from related; closure and 264.140, financial 265.140 Subpart responsibility H...) Correction--chang 264.143. e ``resource reclamation units'' to ``recycling units''. 620(4)(d)(iv...

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-06-01

    Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less

  5. Structurally integrated steel solar collector

    DOEpatents

    Moore, Stanley W.

    1977-03-08

    Herein is disclosed a flat plate solar heat collector unit. The solar collector is integrated as a structural unit so that the collector also functions as the building roof. The functions of efficient heat collection, liquid coolant flow passages, roof structural support and building insulation are combined into one unit.

  6. Stream-wise distribution of skin-friction drag reduction on a flat plate with bubble injection

    NASA Astrophysics Data System (ADS)

    Qin, Shijie; Chu, Ning; Yao, Yan; Liu, Jingting; Huang, Bin; Wu, Dazhuan

    2017-03-01

    To investigate the stream-wise distribution of skin-friction drag reduction on a flat plate with bubble injection, both experiments and simulations of bubble drag reduction (BDR) have been conducted in this paper. Drag reductions at various flow speeds and air injection rates have been tested in cavitation tunnel experiments. Visualization of bubble flow pattern is implemented synchronously. The computational fluid dynamics (CFD) method, in the framework of Eulerian-Eulerian two fluid modeling, coupled with population balance model (PBM) is used to simulate the bubbly flow along the flat plate. A wide range of bubble sizes considering bubble breakup and coalescence is modeled based on experimental bubble distribution images. Drag and lift forces are fully modeled based on applicable closure models. Both predicted drag reductions and bubble distributions are in reasonable concordance with experimental results. Stream-wise distribution of BDR is revealed based on CFD-PBM numerical results. In particular, four distinct regions with different BDR characteristics are first identified and discussed in this study. Thresholds between regions are extracted and discussed. And it is highly necessary to fully understand the stream-wise distribution of BDR in order to establish a universal scaling law. Moreover, mechanism of stream-wise distribution of BDR is analysed based on the near-wall flow parameters. The local drag reduction is a direct result of near-wall max void fraction. And the near-wall velocity gradient modified by the presence of bubbles is considered as another important factor for bubble drag reduction.

  7. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less

  8. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  9. 32 CFR 174.18 - Historic preservation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REVITALIZING BASE CLOSURE COMMUNITIES AND ADDRESSING IMPACTS OF REALIGNMENT Environmental Matters § 174.18... planning and zoning actions undertaken by units of State or local government; if so, working with such...

  10. Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 224 is located in Areas 02, 03, 05, 06, 11, and 23 of the Nevada Test Site, which is situated approximately 65 miles northwest of Las Vegas, Nevada. CAU 224 is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 as Decon Pad and Septic Systems and is comprised of the following nine Corrective Action Sites (CASs): CAS 02-04-01, Septic Tank (Buried); CAS 03-05-01, Leachfield; CAS 05-04-01, Septic Tanks (4)/Discharge Area; CAS 06-03-01, Sewage Lagoons (3); CAS 06-05-01, Leachfield; CAS 06-17-04, Decon Pad and Wastewater Catch; CAS 06-23-01, Decon Pad Discharge Piping; CASmore » 11-04-01, Sewage Lagoon; and CAS 23-05-02, Leachfield. The Nevada Division of Environmental Protection (NDEP)-approved corrective action alternative for CASs 02-04-01, 03-05-01, 06-03-01, 11-04-01, and 23-05-02 is no further action. As a best management practice, the septic tanks and distribution box were removed from CASs 02-04-01 and 11-04-01 and disposed of as hydrocarbon waste. The NDEP-approved correction action alternative for CASs 05-04-01, 06-05-01, 06-17-04, and 06-23-01 is clean closure. Closure activities for these CASs included removing and disposing of radiologically and pesticide-impacted soil and debris. CAU 224 was closed in accordance with the NDEP-approved CAU 224 Corrective Action Plan (CAP). The closure activities specified in the CAP were based on the recommendations presented in the CAU 224 Corrective Action Decision Document (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2005). This Closure Report documents CAU 224 closure activities. During closure activities, approximately 60 cubic yards (yd3) of mixed waste in the form of soil and debris; approximately 70 yd{sup 3} of sanitary waste in the form of soil, liquid from septic tanks, and concrete debris; approximately 10 yd{sup 3} of hazardous waste in the form of pesticide-impacted soil; approximately 0.5 yd{sup 3} of universal waste in the form of fluorescent light bulbs; and approximately 0.5 yd{sup 3} of low-level waste in the form of a radiologically impacted fire hose rack were generated, managed, and disposed of appropriately. Waste minimization techniques, such as the utilization of laboratory analysis and field screening to guide the extent of excavations, were employed during the performance of closure work.« less

  11. Jam proof closure assembly for lidded pressure vessels

    DOEpatents

    Cioletti, Olisse C.

    1992-01-01

    An expendable closure assembly is provided for use (in multiple units) with a lockable pressure vessel cover along its rim, such as of an autoclave. This assembly is suited to variable compressive contact and locking with the vessel lid sealing gasket. The closure assembly consists of a thick walled sleeve insert for retention in the under bores fabricated in the cover periphery and the sleeve is provided with internal threading only. A snap serves as a retainer on the underside of the sleeve, locking it into an under bore retention channel. Finally, a standard elongate externally threaded bolt is sized for mating cooperation with the so positioned sleeve, whereby the location of the bolt shaft in the cover bore hole determines its compressive contact on the underlying gasket.

  12. A Rocket-Base Study of Auroral Electrodynamics Within the Current Closure Ionosphere

    NASA Technical Reports Server (NTRS)

    Kaeppler, Stephen R.; Kletzing, Craig; Bounds, Scott R.; Sigsbee, Kristine M.; Gjerloev, Jesper W.; Anderson, Brian Jay; Korth, Haje; Lessard, Marc; Labelle, James W.; Dombrowski, Micah P.; hide

    2011-01-01

    The Auroral Current and Electrodynamics Structure (ACES) mission consisted of two sounding rockets launched nearly simultaneously from Poker Flat Research Range, AK on January 29, 2009 into a dynamic multiple-arc aurora. The ACES rocket mission, in conjunction with the PFISR Radar, was designed to observe the three-dimensional current system of a stable auroral arc system. ACES utilized two well instrumented payloads flown along very similar magnetic field footprints, at various altitudes with small temporal separation between both payloads. ACES High, the higher altitude payload (apogee 360 km), took in-situ measurements of the plasma parameters above the current closure region to provide the input signature into the lower ionosphere. ACES Low, the low-altitude payload (apogee 130 km), took similar observations within the current closure region, where cross-field currents can flow. We present results comparing observations of the electric fields, magnetic fields, electron flux, and the electron temperature at similar magnetic footpoints between both payloads. We further present data from all-sky imagers and PFISR detailing the evolution of the auroral event as the payloads traversed regions connected by similar magnetic footpoints. Current measurements derived from the magnetometers on both payloads are further compared. We examine data from both PFISR and observations on the high-altitude payload which we interpreted as a signature of electron acceleration by means of Alfv n waves. We further examine all measurements to understand ionospheric conductivity and how energy is being deposited into the ionosphere through Joule heating. Data from ACES is compared against models of Joule heating to make inferences regarding the effect of collisions at various altitudes.

  13. High bit rate mass data storage device

    NASA Technical Reports Server (NTRS)

    1973-01-01

    The HDDR-II mass data storage system consists of a Leach MTR 7114 recorder reproducer, a wire wrapped, integrated circuit flat plane and necessary power supplies for the flat plane. These units, with interconnecting cables and control panel are enclosed in a common housing mounted on casters. The electronics used in the HDDR-II double density decoding and encoding techniques are described.

  14. Rock Slope Design Criteria : Executive Summary Report

    DOT National Transportation Integrated Search

    2010-06-01

    Based on the stratigraphy and the type of slope stability problems, the flat lying, Paleozoic age, sedimentary rocks of Ohio were divided into three design units: 1) competent rock design unit consisting of sandstones, limestones, and siltstones that...

  15. Cascaded chirped narrow bandpass filter with flat-top based on two-dimensional photonic crystals.

    PubMed

    Zhuang, Yuyang; Chen, Heming; Ji, Ke

    2017-05-10

    We propose a structure of a cascaded chirped narrow bandpass filter with a flat-top based on two-dimensional (2D) photonic crystals (PhCs). The filter discussed here consists of three filter units, each with a resonator and two reflectors. Coupled mode theory and transfer matrix method are methodologies applied in the analysis of the features. The calculations show that the bandwidth of the filter can be adjusted by changing the distances between resonators and reflectors, and based on this, a flat-top response can be achieved by chirped-cascading the filter units. According to the theoretical model, we design a narrow bandpass filter based on 2D PhCs with a triangular lattice of air holes, the parameters of which are calculated using the finite element method. The simulation results show that the filter has a center frequency of 193.40 THz, an insertion loss of 0.18 dB, a flat bandwidth of 40 GHz, and ripples of about 0.2 dB in the passband. The filter is suitable for dense-wavelength-division-multiplexed optical communication systems with 100 GHz channel spacing.

  16. Evaluation of the 2013 Southeast Asian Haze on Solar Generation Performance

    PubMed Central

    Maghami, Mohammadreza; Hizam, Hashim; Gomes, Chandima; Hajighorbani, Shahrooz; Rezaei, Nima

    2015-01-01

    Pollution in Southeast Asia is a major public energy problem and the cause of energy losses. A significant problem with respect to this type of pollution is that it decreases energy yield. In this study, two types of photovoltaic (PV) solar arrays were used to evaluate the effect of air pollution. The performance of two types of solar arrays were analysed in this research, namely, two units of a 1 kWp tracking flat photovoltaic (TFP) and two units of a 1 kWp fixed flat photovoltaic arrays (FFP). Data analysis was conducted on 2,190 samples at 30 min intervals from 01st June 2013, when both arrays were washed, until 30th June 2013. The performance was evaluated by using environmental data (irradiation, temperature, dust thickness, and air pollution index), power output, and energy yield. Multiple regression models were predicted in view of the environmental data and PV array output. Results showed that the fixed flat system was more affected by air pollution than the tracking flat plate. The contribution of this work is that it considers two types of photovoltaic arrays under the Southeast Asian pollution 2013. PMID:26275303

  17. Polarization curling and flux closures in multiferroic tunnel junctions

    NASA Astrophysics Data System (ADS)

    Peters, Jonathan J. P.; Apachitei, Geanina; Beanland, Richard; Alexe, Marin; Sanchez, Ana M.

    2016-11-01

    Formation of domain walls in ferroelectrics is not energetically favourable in low-dimensional systems. Instead, vortex-type structures are formed that are driven by depolarization fields occurring in such systems. Consequently, polarization vortices have only been experimentally found in systems in which these fields are deliberately maximized, that is, in films between insulating layers. As such configurations are devoid of screening charges provided by metal electrodes, commonly used in electronic devices, it is wise to investigate if curling polarization structures are innate to ferroelectricity or induced by the absence of electrodes. Here we show that in unpoled Co/PbTiO3/(La,Sr)MnO3 ferroelectric tunnel junctions, the polarization in active PbTiO3 layers 9 unit cells thick forms Kittel-like domains, while at 6 unit cells there is a complex flux-closure curling behaviour resembling an incommensurate phase. Reducing the thickness to 3 unit cells, there is an almost complete loss of switchable polarization associated with an internal gradient.

  18. Polarization curling and flux closures in multiferroic tunnel junctions

    PubMed Central

    Peters, Jonathan J. P.; Apachitei, Geanina; Beanland, Richard; Alexe, Marin; Sanchez, Ana M.

    2016-01-01

    Formation of domain walls in ferroelectrics is not energetically favourable in low-dimensional systems. Instead, vortex-type structures are formed that are driven by depolarization fields occurring in such systems. Consequently, polarization vortices have only been experimentally found in systems in which these fields are deliberately maximized, that is, in films between insulating layers. As such configurations are devoid of screening charges provided by metal electrodes, commonly used in electronic devices, it is wise to investigate if curling polarization structures are innate to ferroelectricity or induced by the absence of electrodes. Here we show that in unpoled Co/PbTiO3/(La,Sr)MnO3 ferroelectric tunnel junctions, the polarization in active PbTiO3 layers 9 unit cells thick forms Kittel-like domains, while at 6 unit cells there is a complex flux-closure curling behaviour resembling an incommensurate phase. Reducing the thickness to 3 unit cells, there is an almost complete loss of switchable polarization associated with an internal gradient. PMID:27848970

  19. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  20. 43 CFR 3809.431 - When must I modify my plan of operations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... impacts from unanticipated events or conditions or newly discovered circumstances or information... units; (6) Providing for post-closure management; and (7) Eliminating hazards to public safety. ...

  1. Calendar Year 2007 Resource Conservation and Recovery Act Annual Monitoring Report for the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee - RCRA Post-Closure Permit Nos. TNHW-113, TNHW-116, and TNHW-128

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elvado Environmental

    2008-02-01

    This report contains groundwater quality monitoring data obtained during calendar year (CY) 2007 at the following hazardous waste treatment, storage, and disposal (TSD) units located at the US Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12) in Oak Ridge, Tennessee; this S-3 Site, Oil Landfarm, Bear Creek Burial Grounds/Walk-In Pits (BCBG/WIP), Eastern S-3 Site Plume, Chestnut Ridge Security Pits (CRSP), Chestnut Ridge Sediment Disposal Baste (CRSDB), few Hollow Quarry (KHQ), and East Chestnut Ridge Waste Pile (ECRWP). Hit monitoring data were obtained in accordance with the applicable Resource Conservation and Recovery Act of 1976 (RCRA) hazardousmore » waste post-closure permit (PCP). The Tennessee Department of Environment and Conservation (TDEC) - Division of Solid Waste Management issued the PCPs to define the requirements for RCRA post-closure inspection, maintenance, and groundwater monitoring at the specified TSD units located within the Bear Creek Hydrogeologic Regime (PCP no. TNHW-116), Upper East Fork Poplar Creek Hydrogeologic Regime (PCP no. TNHW-113), and Chestnut Ridge Hydrogeologic Regime (PCP no. TNHW-128). Each PCP requires the Submittal of an annual RCRA groundwater monitoring report containing the groundwater sampling information and analytical results obtained at each applicable TSD unit during the preceding CY, along with an evaluation of groundwater low rates and directions and the analytical results for specified RCRA groundwater target compounds; this report is the RCRA annual groundwater monitoring report for CY 2007. The RCRA post-closure groundwater monitoring requirements specified in the above-referenced PCP for the Chestnut Ridge Regime replace those defined in the previous PCP (permit no. TNHW-088), which expired on September 18, 2005, but remained effective until the TDEC issued the new PCP in September 2006. The new PCP defines site-specific groundwater sampling and analysis requirements for the CRSDB, CRSP, and KHQ that differ from those established under the expired PCP, including modified suites of laboratory analytes (RCRA groundwater target compounds) for each site and annual rather than semiannual sampling frequencies for the CRSDB and KHQ. The new PCP also specifies the RCRA post-closure groundwater monitoring requirements for the ECRWP, a closed TSD unit that was not addressed in the expired PCP.« less

  2. Bottom sediments and nutrients in the tidal Potomac system, Maryland and Virginia

    USGS Publications Warehouse

    Glenn, Jerry L.

    1988-01-01

    The characteristics and distributions of near-surface bottom sediments and of nutrients in the sediments provide information on modern sediment and nutrient sources, sedimentation environments, and geochemical reactions in the tidal Potomac system, Maryland and Virginia. This information is fundamental to an improved understanding of sedimentation and eutrophication problems in the tidal Potomac system. The tidal Potomac system consists of 1,230 square kilometers of intertidal to subtidal Potomac mainstem and tributary streambed from the heads-of-tides to Chesapeake Bay. Tidal Potomac sediments are dominantly silt and clay except in local areas. An average sediment sample is about two-thirds silt and clay (fine) particles and one-third sand (coarse) particles. The mean of the median size of all samples is 6.60 phi, or 0.010 millimeters. Sorting generally is poor and the average sediment is skewed toward the fine tail of the size-distribution curve. Mean particle-size measures have large standard deviations. Among geomorphic units, two distinctly different size populations are found; fine (median phi about 9), and poorly sorted (sorting about 3) sediments in the channel and the smooth flat, and coarse (median phi about 2), and well sorted (sorting about 1) sediments in the shoreline flat and the irregular slope. Among mainstem hydrologic divisions, an average sediment from the river and the estuary division is coarser and more variable than an average sediment from the transition division. Substantial concentrations of total carbon, total nitrogen, and total phosphorus, and limited amounts of inorganic carbon, ammonia nitrogen and nitrite plus nitrate nitrogen occur in tidal Potomac sediments. An average tidal Potomac sediment sample weighing 1 kilogram contains about 21,000 milligrams of total carbon, 2,400 milligrams of total nitrogen, 1,200 milligrams of total phosphorus, 600 milligrams of inorganic carbon, 170 milligrams of ammonia nitrogen, and 2 milligrams of nitrite plus nitrate nitrogen. Total carbon, nitrogen, and phosphorus have an average ratio by weight of 18:2:1 and an average ratio by atoms of 94:8:1. Nutrient concentrations and nutrient ratios have large ranges and standard deviations. Nutrient concentrations usually are closely related to particle size; large concentrations are characteristic of fine sediments in the channel and the smooth flat, and small concentrations are typical of coarse sediments in the shoreline flat and the irregular slope. Concentrations typically decrease from the river division to the estuary division. Mainstem and tributaries show no statistically significant difference in mean particle-size measures or mean nutrient concentrations. Tributaries do not contribute large quantities of sediment with diverse texture or nutrient content to the Potomac mainstem. Particle-size measures and nutrient concentrations in the mainstem are significantly related to hydrologic divisions and geomorphic units; that is, particle size and nutrients vary significantly along and across the Potomac mainstem. Lateral variations in particle size and nutrient content are more pronounced and contribute more to significant relations than longitudinal variations contribute. The mean values for the median particle size and for the percentage of sand indicate significant variations among hydrologic divisions for samples from a geomorphic unit, and among geomorphic units, for samples from a hydrologic division. Sediments of channels and smooth flats in the river division commonly are coarser than sediments of channels and smooth flats in the transition and the estuary divisions. Shoreline flats in the estuary division are coarser than shoreline flats in the river division. Shoreline flats and irregular slopes in each hydrologic division generally are significantly coarser than channels and smooth flats. Relations between particle-size measures and geomorphic units show progressively larger cor

  3. A field evaluation of the Eye-Closure Interview with witnesses of serious crimes.

    PubMed

    Vredeveldt, Annelies; Tredoux, Colin G; Nortje, Alicia; Kempen, Kate; Puljević, Cheneal; Labuschagne, Gérard N

    2015-04-01

    Laboratory research shows that eye-closure during memory retrieval improves both the amount and the factual accuracy of memory reports about witnessed events. Based on these findings, we developed the Eye-Closure Interview, and examined its feasibility (in terms of compliance with the instructions) and effectiveness (in terms of the quantity and quality of reported information) in eyewitness interviews conducted by the South African Police Service. Police interviewers from the Facial Identification Unit were randomly assigned to receive Eye-Closure Interview training or no training. We analyzed 95 interviews with witnesses of serious crimes (including robbery, rape, and murder), some of whom were instructed to close their eyes during salient parts of the interview. Witnesses in the control condition rarely spontaneously closed their eyes, but witnesses in the Eye-Closure Interview condition kept their eyes closed during 97% of their descriptions, suggesting that the Eye-Closure Interview would be easy to implement in a field setting. Although witnesses who closed their eyes did not remember more information overall, the information they provided was considered to be of significantly greater forensic relevance (as reflected in 2 independent blind assessments, 1 by a senior police expert and 1 by a senior researcher). Thus, based on the findings from this field study and from previous laboratory research, we conclude that implementation of the Eye-Closure Interview in witness interviews would help police interviewers to elicit more valuable information from witnesses, which could be relevant to the police investigation and/or in court. (PsycINFO Database Record (c) 2015 APA, all rights reserved).

  4. Permanent Disposal of Nuclear Waste in Salt

    NASA Astrophysics Data System (ADS)

    Hansen, F. D.

    2016-12-01

    Salt formations hold promise for eternal removal of nuclear waste from our biosphere. Germany and the United States have ample salt formations for this purpose, ranging from flat-bedded formations to geologically mature dome structures. Both nations are revisiting nuclear waste disposal options, accompanied by extensive collaboration on applied salt repository research, design, and operation. Salt formations provide isolation while geotechnical barriers reestablish impermeability after waste is placed in the geology. Between excavation and closure, physical, mechanical, thermal, chemical, and hydrological processes ensue. Salt response over a range of stress and temperature has been characterized for decades. Research practices employ refined test techniques and controls, which improve parameter assessment for features of the constitutive models. Extraordinary computational capabilities require exacting understanding of laboratory measurements and objective interpretation of modeling results. A repository for heat-generative nuclear waste provides an engineering challenge beyond common experience. Long-term evolution of the underground setting is precluded from direct observation or measurement. Therefore, analogues and modeling predictions are necessary to establish enduring safety functions. A strong case for granular salt reconsolidation and a focused research agenda support salt repository concepts that include safety-by-design. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Author: F. D. Hansen, Sandia National Laboratories

  5. Large numbers hypothesis. IV - The cosmological constant and quantum physics

    NASA Technical Reports Server (NTRS)

    Adams, P. J.

    1983-01-01

    In standard physics quantum field theory is based on a flat vacuum space-time. This quantum field theory predicts a nonzero cosmological constant. Hence the gravitational field equations do not admit a flat vacuum space-time. This dilemma is resolved using the units covariant gravitational field equations. This paper shows that the field equations admit a flat vacuum space-time with nonzero cosmological constant if and only if the canonical LNH is valid. This allows an interpretation of the LNH phenomena in terms of a time-dependent vacuum state. If this is correct then the cosmological constant must be positive.

  6. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2013-01-28

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2012 and includes inspection and repair activities completed at the following CAUs: · CAU 400: Bomblet Pit and Five Points Landfill (TTR) · CAU 407: Roller Coaster RadSafe Area (TTR) · CAU 424: Area 3 Landfill Complexes (TTR) · CAU 453: Area 9 UXO Landfill (TTR) · CAU 487: Thunderwell Site (TTR)

  7. Update: independently owned pharmacy closures in rural America, 2003-2013.

    PubMed

    Ullrich, Fred; Mueller, Keith J

    2014-06-01

    Key Findings. (1) From March 2003 to December 2013, there was a loss of 924 (12.1%) independently owned rural pharmacies in the United States. The most drastic loss occurred between 2007 and 2009. From 2010-2013, the trend has been for more closures, although the decline is not as pronounced or clear as in earlier years. (2) Four hundred ninety rural communities that had one or more retail pharmacy (including independent, chain, or franchise pharmacy) in March 2003 had no retail pharmacy in December 2013.

  8. 10 CFR 61.52 - Land disposal facility operation and disposal site closure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... meters below the top surface of the cover or must be disposed of with intruder barriers that are designed... mapped by means of a land survey. Near-surface disposal units must be marked in such a way that the boundaries of each unit can be easily defined. Three permanent survey marker control points, referenced to...

  9. 10 CFR 61.52 - Land disposal facility operation and disposal site closure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... meters below the top surface of the cover or must be disposed of with intruder barriers that are designed... mapped by means of a land survey. Near-surface disposal units must be marked in such a way that the boundaries of each unit can be easily defined. Three permanent survey marker control points, referenced to...

  10. 10 CFR 61.52 - Land disposal facility operation and disposal site closure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... meters below the top surface of the cover or must be disposed of with intruder barriers that are designed... mapped by means of a land survey. Near-surface disposal units must be marked in such a way that the boundaries of each unit can be easily defined. Three permanent survey marker control points, referenced to...

  11. 10 CFR 61.52 - Land disposal facility operation and disposal site closure.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... meters below the top surface of the cover or must be disposed of with intruder barriers that are designed... mapped by means of a land survey. Near-surface disposal units must be marked in such a way that the boundaries of each unit can be easily defined. Three permanent survey marker control points, referenced to...

  12. 10 CFR 61.52 - Land disposal facility operation and disposal site closure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... meters below the top surface of the cover or must be disposed of with intruder barriers that are designed... mapped by means of a land survey. Near-surface disposal units must be marked in such a way that the boundaries of each unit can be easily defined. Three permanent survey marker control points, referenced to...

  13. The Learned Report on Teacher Education: A Vision Delayed

    ERIC Educational Resources Information Center

    Imig, David; Imig, Scott

    2005-01-01

    Ninety-five years ago, the Carnegie Foundation for the Advancement of Teaching released Bulletin #4, otherwise known as The Flexner Report on Medical Education in the United States and Canada, a report on the education of physicians in the United States and Canada that lead to closure of half the medical schools in the country and determine the…

  14. Effects of initial amplitude and pycnocline thickness on the evolution of mode-2 internal solitary waves

    NASA Astrophysics Data System (ADS)

    Cheng, Ming-Hung; Hsieh, Chih-Min; Hwang, Robert R.; Hsu, John R.-C.

    2018-04-01

    Numerical simulations are performed to investigate the effects of the initial amplitude and pycnocline thickness on the evolutions of convex mode-2 internal solitary waves propagating on the flat bottom. A finite volume method based on a Cartesian grid system is adopted to solve the Navier-Stokes equations using the improved delayed detached eddy simulation turbulent closure model. Mode-2 internal solitary waves (ISWs) are found to become stable at t = 15 s after lifting a vertical sluice gate by a gravity collapse mechanism. Numerical results from three cases of pycnocline thickness reveal the following: (1) the occurrence of a smooth mode-2 ISW when the wave amplitude is small; (2) the PacMan phenomenon for large amplitude waves; and (3) pseudo vortex shedding in the case of very large amplitudes. In general, basic wave properties (wave amplitude, wave speed, vorticity, and wave energy) increase as the wave amplitude increases for a specific value of the pycnocline thickness. Moreover, the pycnocline thickness chiefly determines the core size of a convex mode-2 ISW, while the step depth (that generates an initial wave amplitude) and offset in pycnocline govern the waveform type during its propagation on the flat bottom.

  15. Color flat panel display for the Bradley Fighting Vehicle

    NASA Astrophysics Data System (ADS)

    Prince, J. Colin; Martin, A. J.

    1996-05-01

    The modernization program for the Bradley Fighting Vehicle, M2 A3, represents the first deployment of an active matrix liquid crystal display, AMLCD, in a military ground vehicle. In many respects the selection of AMLCD was determined according to the familiar metrics which have resulted in AMLCD being broadly selected for modern air vehicle installations. In fact, there is considerable similarities between the Bradley AMLCD and its recent forbearers in the avionic industry. In the Bradley, the AMLCD unit is referred to as a color flat panel display, CFPD and the features of this unit, as well as its environment and utilization are described in this paper.

  16. 75 FR 54656 - Government-Owned Inventions, Available for Licensing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... Aeronautics and Space Administration, have been filed in the United States Patent and Trademark office, and...; (281) 483-6936 [Facsimile]. NASA Case No. MSC-24238-1: Microwave Tissue Welding for Wound Closure...

  17. 31 CFR 413.2 - Coordination with other authorities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.2 Coordination... Secretary of the Interior, the Secretary of the Treasury or the Director, United States Secret Service. ...

  18. 31 CFR 413.2 - Coordination with other authorities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.2 Coordination... Secretary of the Interior, the Secretary of the Treasury or the Director, United States Secret Service. ...

  19. 31 CFR 413.2 - Coordination with other authorities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.2 Coordination... Secretary of the Interior, the Secretary of the Treasury or the Director, United States Secret Service. ...

  20. 31 CFR 413.2 - Coordination with other authorities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.2 Coordination... Secretary of the Interior, the Secretary of the Treasury or the Director, United States Secret Service. ...

  1. 31 CFR 413.2 - Coordination with other authorities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) SECRET SERVICE, DEPARTMENT OF THE TREASURY CLOSURE OF STREETS NEAR THE WHITE HOUSE § 413.2 Coordination... Secretary of the Interior, the Secretary of the Treasury or the Director, United States Secret Service. ...

  2. Modelling the impact of local reactive school closures on critical care provision during an influenza pandemic

    PubMed Central

    House, Thomas; Baguelin, Marc; Van Hoek, Albert Jan; White, Peter J.; Sadique, Zia; Eames, Ken; Read, Jonathan M.; Hens, Niel; Melegaro, Alessia; Edmunds, W. John; Keeling, Matt J.

    2011-01-01

    Despite the fact that the 2009 H1N1 pandemic influenza strain was less severe than had been feared, both seasonal epidemics of influenza-like-illness and future influenza pandemics have the potential to place a serious burden on health services. The closure of schools has been postulated as a means of reducing transmission between children and hence reducing the number of cases at the peak of an epidemic; this is supported by the marked reduction in cases during school holidays observed across the world during the 2009 pandemic. However, a national policy of long-duration school closures could have severe economic costs. Reactive short-duration closure of schools in regions where health services are close to capacity offers a potential compromise, but it is unclear over what spatial scale and time frame closures would need to be made to be effective. Here, using detailed geographical information for England, we assess how localized school closures could alleviate the burden on hospital intensive care units (ICUs) that are reaching capacity. We show that, for a range of epidemiologically plausible assumptions, considerable local coordination of school closures is needed to achieve a substantial reduction in the number of hospitals where capacity is exceeded at the peak of the epidemic. The heterogeneity in demand per hospital ICU bed means that even widespread school closures are unlikely to have an impact on whether demand will exceed capacity for many hospitals. These results support the UK decision not to use localized school closures as a control mechanism, but have far wider international public-health implications. The spatial heterogeneities in both population density and hospital capacity that give rise to our results exist in many developed countries, while our model assumptions are sufficiently general to cover a wide range of pathogens. This leads us to believe that when a pandemic has severe implications for ICU capacity, only widespread school closures (with their associated costs and organizational challenges) are sufficient to mitigate the burden on the worst-affected hospitals. PMID:21288945

  3. 46 CFR 174.085 - Flooding on column stabilized units.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the unit, and within 5 feet (1.5 meters) of an outer surface of a column or footing on the periphery... into watertight compartments by horizontal watertight flats, all compartments in the column within 5 feet (1.5 meters) of the unit's waterline before damage causing flooding must be assumed to be subject...

  4. The remarkable ability of turbulence model equations to describe transition

    NASA Technical Reports Server (NTRS)

    Wilcox, David C.

    1992-01-01

    This paper demonstrates how well the k-omega turbulence model describes the nonlinear growth of flow instabilities from laminar flow into the turbulent flow regime. Viscous modifications are proposed for the k-omega model that yield close agreement with measurements and with Direct Numerical Simulation results for channel and pipe flow. These modifications permit prediction of subtle sublayer details such as maximum dissipation at the surface, k approximately y(exp 2) as y approaches 0, and the sharp peak value of k near the surface. With two transition specific closure coefficients, the model equations accurately predict transition for an incompressible flat-plate boundary layer. The analysis also shows why the k-epsilon model is so difficult to use for predicting transition.

  5. Development of a three-dimensional Navier-Stokes code on CDC star-100 computer

    NASA Technical Reports Server (NTRS)

    Vatsa, V. N.; Goglia, G. L.

    1978-01-01

    A three-dimensional code in body-fitted coordinates was developed using MacCormack's algorithm. The code is structured to be compatible with any general configuration, provided that the metric coefficients for the transformation are available. The governing equations are developed in primitive variables in order to facilitate the incorporation of physical boundary conditions and turbulence-closure models. MacCormack's two-step, unsplit, time-marching algorithm is used to solve the unsteady Navier-Stokes equations until steady-state solution is achieved. Cases discussed include (1) flat plate in supersonic free stream; (2) supersonic flow along an axial corner; (3) subsonic flow in an axial corner at M infinity = 0.95; and (4) supersonic flow in an axial corner at M infinity 1.5.

  6. Stratigraphy and evolution of emerged Pleistocene reefs at the Red Sea coast of Sudan

    NASA Astrophysics Data System (ADS)

    Hamed, Basher; Bussert, Robert; Dominik, Wilhelm

    2016-02-01

    Emerged Pleistocene coral reefs constitute a prominent landform along the Red Sea coast of Sudan. They are well exposed with a thickness of up to 12 m and extend over a width of about 3 km parallel to the coastline. Four major reef units that represent different reef zones are distinguished. Unit 1 is located directly at the coastline and is assigned to the rock-reef rim, while unit 2 represents the reef-front zone. Unit 3 is attributed to the reef-flat zone and unit 4 to the back-reef zone. The stratigraphic position and age of the four units respectively the facies zones are based on field relationships and δ18O analysis. Results of δ18O analysis of coral, gastropod and bivalve samples were correlated to previous age dating of correlative reefs in Sudan and other parts of the Red Sea region. Estimation of reef ages was mainly based on δ18O values of the reef-front zone (unit 2) and the observed sedimentary succession of the reefs. δ18O values of two Porites coral samples from the reef-front zone strongly suggest equivalent ages of 120 and 122 ka that correspond to marine isotope stage MIS 5.5. Based on δ18O values and the field relationship to the reef-front zone, ages of reef-flat zone (unit 3) and back-reef zone (unit 4) could be assigned to MIS 9 and MIS 7 respectively. MIS 5.1 is suggested for the reef-rock rim (unit 1). The relationship of the reef zones to individual MIS might be explained by the predominance of a specific zone during a certain stage, while other facies were less well developed and/or later eroded by wave action. The reef unit most distal from the recent coastline formed during interglacial stage MIS 7, while former studies assign this unit to interglacial stage MIS 9. Unique flourishing, high diversity and excellent preservation of corals in the back-reef unit of MIS 7 reflect growth in troughs landward of the oldest reef-flat formed during previous interglacial stage MIS 9.

  7. Managing hospitals in turbulent times: do organizational changes improve hospital survival?

    PubMed Central

    Lee, S Y; Alexander, J A

    1999-01-01

    OBJECTIVE: To examine (1) the degree to which organizational changes affected hospital survival; (2) whether core and peripheral organizational changes affected hospital survival differently; and (3) how simultaneous organizational changes affected hospital survival. DATA SOURCES: AHA Hospital Surveys, the Area Resource File, and the AHA Hospital Guides, Part B: Multihospital Systems. STUDY DESIGN: The study employed a longitudinal panel design. We followed changes in all community hospitals in the continental United States from 1981 through 1994. The dependent variable, hospital closure, was examined as a function of multiple changes in a hospital's core and peripheral structures as well as the hospital's organizational and environmental characteristics. Cox regression models were used to test the expectations that core changes increased closure risk while peripheral changes decreased such risk, and that simultaneous core and peripheral changes would lead to higher risk of closure. PRINCIPAL FINDINGS: Results indicated more peripheral than core changes in community hospitals. Overall, findings contradicted our expectations. Change in specialty, a core change, was beneficial for hospitals, because it reduced closure risk. The two most frequent peripheral changes, downsizing and leadership change, were positively associated with closure. Simultaneous organizational changes displayed a similar pattern: multiple core changes reduced closure risk, while multiple peripheral changes increased the risk. These patterns held regardless of the level of uncertainty in hospital environments. CONCLUSIONS: Organizational changes are not all beneficial for hospitals, suggesting that hospital leaders should be both cautious and selective in their efforts to turn their hospitals around. PMID:10536977

  8. Sixteen-week analysis of unaltered elastomeric chain relating in-vitro force degradation with in-vivo extraction space tooth movement.

    PubMed

    Evans, Kristin S; Wood, Cory M; Moffitt, Allen H; Colgan, John A; Holman, J Kevin; Marshall, Steven D; Pope, D Spencer; Sample, Lew B; Sherman, Stephen L; Sinclair, Peter M; Trulove, Tim S

    2017-04-01

    The purposes of this study were to evaluate whether unaltered elastomeric chain can continue to move teeth for 16 weeks and to relate it to the amount of force remaining for the same batch of elastomeric chains. The in-vivo portion of the study had a sample of 30 paired extraction space sites from 22 subjects who were measured for closure of the space every 28 days. The altered side elastomeric chain served as the control and was replaced at 28-day intervals whereas the experimental side remained unaltered. In the in-vitro portion of the study, 100 each of 2-unit and 3-unit segments of the same batch of elastomeric chains were placed in a water bath, and the force was measured for 20 of each segment length at the 28-day measurement points. Statistically significant amounts of space closure occurred at both the altered and unaltered sites at all measurement time points. The mean space closure at the altered sites was minimally greater than that observed at the paired unaltered sites. The mean differences of space closure between the altered and unaltered sites ranged from a minimum of -0.05 mm at 4 weeks to a maximum of -0.14 mm at 8 weeks. The elastomeric chain force degraded rapidly by 4 weeks but continued a gradual diminution of force to 86 g at 16 weeks. Unaltered elastomeric chain continued to move teeth into extraction spaces for 16 weeks in this sample from both statistically and clinically significant standpoints. There were minimal and statistically insignificant differences in the mean space closure measurements between the paired altered and unaltered sites. The elastomeric chain force at 16 weeks was less than 100 g, yet at the same time point, teeth continued to move clinically. Copyright © 2016 American Association of Orthodontists. Published by Elsevier Inc. All rights reserved.

  9. 50 CFR 648.101 - Closures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Summer... fishing for summer flounder by commercial vessels for the remainder of the calendar year by publishing... available for landing summer flounder in that state. ...

  10. Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.

    This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less

  11. Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 489: WWII UXO Sites, Tonopah Test Range, Nevada; May 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Nevada; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2005-05-01

    This Streamlined Approach for Environmental Restoration Plan provides the details for the closure of Corrective Action Unit (CAU) 489: WWII UXO Sites, Tonopah Test Range. CAU 489 is located at the Tonopah Test Range and is currently listed in Appendix III of the Federal Facility Agreement and Consent Order of 1996.

  12. 33 CFR 165.164 - Regulated Navigation Areas, Security Zones: Dignitary Arrival/Departure and United Nations...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... regulated navigation areas (RNA) or security zones: (1) Wall Street Heliport RNA. All waters of the East... northwest corner of Pier 2 North, Brooklyn (NAD 1983). (2) Randalls and Wards Islands RNA: All waters of the..., and all waters south of the Queensboro Bridge (NAD 1983). (6) United Nations Full River Closure RNA...

  13. Nickel titanium springs versus stainless steel springs: A randomized clinical trial of two methods of space closure.

    PubMed

    Norman, Noraina Hafizan; Worthington, Helen; Chadwick, Stephen Mark

    2016-09-01

    To compare the clinical performance of nickel titanium (NiTi) versus stainless steel (SS) springs during orthodontic space closure. Two-centre parallel group randomized clinical trial. Orthodontic Department University of Manchester Dental Hospital and Orthodontic Department Countess of Chester Hospital, United Kingdom. Forty orthodontic patients requiring fixed appliance treatment were enrolled, each being randomly allocated into either NiTi (n = 19) or SS groups (n = 21). Study models were constructed at the start of the space closure phase (T0) and following the completion of space closure (T1). The rate of space closure achieved for each patient was calculated by taking an average measurement from the tip of the canine to the mesiobuccal groove on the first permanent molar of each quadrant. The study was terminated early due to time constraints. Only 30 patients completed, 15 in each study group. There was no statistically significant difference between the amounts of space closed (mean difference 0.17 mm (95%CI -0.99 to 1.34; P = 0.76)). The mean rate of space closure for NiTi coil springs was 0.58 mm/4 weeks (SD 0.24) and 0.85 mm/4 weeks (SD 0.36) for the stainless steel springs. There was a statistically significant difference between the two groups (P = 0.024), in favour of the stainless steel springs, when the mean values per patient were compared. Our study shows that stainless steel springs are clinically effective; these springs produce as much space closure as their more expensive rivals, the NiTi springs.

  14. Lower Hospital Charges and Societal Costs for Catheter Device Closure of Atrial Septal Defects.

    PubMed

    Sanchez, Jessica N; Seckeler, Michael D

    2017-10-01

    Atrial septal defects (ASD) are among the most common congenital heart defects. As more ASDs are corrected by interventional catheterization instead of surgery, it is critical to understand the associated clinical and societal costs. The goal of this study was to use a national U.S. database to describe hospital charges and societal costs for surgical and catheter-based (ASD) closure. Retrospective review of hospital discharge data from the Kids' Inpatient Database from January 2010 to December 2012. The database was queried for admissions for <21 years old with ICD-9 procedure codes for surgical (35.51 or 35.61) or catheter (35.52) ASD closure; those with other cardiac conditions and/or additional cardiac procedures were excluded. Age, length of stay (LOS), and hospital charges and lost parental wages (societal costs) were compared between groups using t test or Mann-Whitney U test, as appropriate. Four hundred and eighty-six surgical and 305 catheter ASD closures were identified. LOS, hospital charges, and total societal costs were higher in surgical ASD compared to catheter ASD admissions (3.6 vs. 1.3 days, p < 0.001, $87,465 vs. $64,109, p < 0.001, and $90,000 vs. $64,966, p < 0.001, respectively). In this review of a large national inpatient database, we found that hospital and societal costs for surgical ASD closure are significantly higher than catheter ASD closure in the United States in the current era. Factors that likely contribute to this include longer LOS and longer post-operative recovery. Using "real-world" data, this study demonstrates a substantial cost advantage for catheter ASD closure compared to surgical.

  15. Progress report. Task 1 - quaternary tectonics, 1 October 1991--30 September 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1992-09-30

    Progress is reported on a study concerned with the quaternary tectonics of Yucca Mountain, the proposed site for an underground disposal facility for high-level radioactive wastes. Refinement and revision of crater Flat Quaternary stratigraphy continued and consisted of several activities: revision of rock varnish cation leaching curve; sample comparison of RV manganese;,iron microlaminations;and correlation of Crater Flat allostratigraphic units with regional chronologies.

  16. Progression of pectinate ligament dysplasia over time in two populations of Flat-Coated Retrievers.

    PubMed

    Pearl, Rose; Gould, David; Spiess, Bernhard

    2015-01-01

    Two of the authors (DG, BS) independently observed that a number of Flat-Coated Retrievers (FCRs) previously unaffected by pectinate ligament dysplasia (PLD) appeared to develop the condition later in life. This study was instigated to investigate progression of PLD within individual dogs over time. Flat-Coated Retrievers that had previously undergone gonioscopy under the UK/ECVO hereditary eye schemes were included in the study. A second gonioscopic examination was performed 1.92-12.58 years later (mean 6, median 5.75 years) and the results compared. 39 FCR (17 males, 22 females) in the UK and 57 FCR (27 males, 30 females) in Switzerland were included. Slit-lamp biomicroscopy, indirect ophthalmoscopy, and gonioscopy were performed in all dogs. Gonioscopy allowed classification as either unaffected or affected; percentage of the iridocorneal drainage angle (ICA) affected by PLD was determined, before calculating progression observed as mild, moderate, or severe. 39 of 96 (40.6%) dogs demonstrated progression of PLD (P < 0.0001). Of these, 13 of 96 (13.5%) were classified as mild progression (from either unaffected to 10-20% or 10-20% to 20-90% ICA affected). Progression was more extensive in 26 of 96 (27.1%) dogs (P < 0.0001), of which 12 of 96 (12.5%) went from unaffected to severe PLD of >90% ICA affected, consistent with a high risk of glaucoma. To the authors' knowledge, this is the first report describing progression of PLD in individual dogs over time, in a breed affected by primary, angle closure glaucoma. © 2013 American College of Veterinary Ophthalmologists.

  17. Optomechanical design and testing of the VLT tertiary mirrors

    NASA Astrophysics Data System (ADS)

    Bollinger, Wolfgang; Juranek, Hans J.; Schulte, Stefan; May, K.; Michel, Alain

    2000-07-01

    The Tertiary Mirrors for the ESO Very Large Telescope project consist of four optical flats (elliptical, 890 X 1260 mm2). The achieved opto-mechanical design is challenging since it provides high optical overall quality combined with high stiffness (70 Hz Eigenfrequency) and low mass (total mass of 180 kg for the complete unit). Schott (Mainz, Germany) produces the lightweight Zerodur blanks. Carl Zeiss has designed and manufactured the mirror and its support cell. Last not least it became necessary to install the biggest testing equipment for flats in Europe to guarantee for a scientifically correct verification of the quality of the complete unit. All four mirrors have been delivered to ESO.

  18. Remote controlled vacuum joint closure mechanism

    DOEpatents

    Doll, D.W.; Hager, E.R.

    1984-02-22

    A remotely operable and maintainable vacuum joint closure mechanism for a noncircular aperture is disclosed. The closure mechanism includes an extendible bellows coupled at one end to a noncircular duct and at its other end to a flange assembly having sealed grooves for establishing a high vacuum seal with the abutting surface of a facing flange which includes an aperture forming part of the system to be evacuated. A plurality of generally linear arrangements of pivotally coupled linkages and piston combinations are mounted around the outer surface of the duct and aligned along the length thereof. Each of the piston/linkage assemblies is adapted to engage the flange assembly by means of a respective piston and is further coupled to a remote controlled piston drive shaft to permit each of the linkages positioned on a respective flat outer surface of the duct to simultaneously and uniformly displace a corresponding piston and the flange assembly with which it is in contact along the length of the duct in extending the bellows to provide a high vacuum seal between the movable flange and the facing flange. A plurality of latch mechanisms are also pivotally mounted on the outside of the duct. A first end of each of the latch mechanisms is coupled to a remotely controlled latch control shaft for displacing the latch mechanism about its pivot point. In response to the pivoting displacement of the latch mechanism, a second end thereof is displaced so as to securely engage the facing flange and maintain the high vacuum seal established by the displacement of the flange assembly and extension of the bellows without displacing the entire duct.

  19. 13. AERIAL VIEW OF THE ROCKY FLATS PLANT FROM DIRECTLY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. AERIAL VIEW OF THE ROCKY FLATS PLANT FROM DIRECTLY OVERHEAD IN 1954. IN 1950, DOW CHEMICAL COMPANY WAS CHOSEN BY THE ATOMIC ENERGY COMMISSION TO ESTABLISH THE ROCKY FLATS PLANT AS AN ATOMIC BOMB TRIGGER FABRICATION FACILITY. THE CRITERIA FOR SITING SUCH A PLANT INCLUDED A LOCATION WEST OF THE MISSISSIPPI, NORTH OF TEXAS, SOUTH OF THE NORTHERN BORDER OF COLORADO, AND EAST OF UTAH; A DRY MODERATE CLIMATE; A SUPPORTING POPULATION OF AT LEAST 25,000 PEOPLE; AND ACCESSIBILITY FROM LOS ALAMOS, NM, CHICAGO, IL, AND ST. LOUIS, MO. TWENTY-ONE AREAS IN THE UNITED STATES WERE SUGGESTED; SEVEN LOCATIONS WERE SCREENED IN THE DENVER AREA. THIS FOUR-SQUARE MILE AREA WAS SELECTED AND CONSTRUCTION BEGAN IN 1951 (8/31/54). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO

  20. Pdf prediction of supersonic hydrogen flames

    NASA Technical Reports Server (NTRS)

    Eifler, P.; Kollmann, W.

    1993-01-01

    A hybrid method for the prediction of supersonic turbulent flows with combustion is developed consisting of a second order closure for the velocity field and a multi-scalar pdf method for the local thermodynamic state. It is shown that for non-premixed flames and chemical equilibrium mixture fraction, the logarithm of the (dimensionless) density, internal energy per unit mass and the divergence of the velocity have several advantages over other sets of scalars. The closure model is applied to a supersonic non-premixed flame burning hydrogen with air supplied by a supersonic coflow and the results are compared with a limited set of experimental data.

  1. Neural correlates of early-closure garden-path processing: Effects of prosody and plausibility.

    PubMed

    den Ouden, Dirk-Bart; Dickey, Michael Walsh; Anderson, Catherine; Christianson, Kiel

    2016-01-01

    Functional magnetic resonance imaging (fMRI) was used to investigate neural correlates of early-closure garden-path sentence processing and use of extrasyntactic information to resolve temporary syntactic ambiguities. Sixteen participants performed an auditory picture verification task on sentences presented with natural versus flat intonation. Stimuli included sentences in which the garden-path interpretation was plausible, implausible because of a late pragmatic cue, or implausible because of a semantic mismatch between an optionally transitive verb and the following noun. Natural sentence intonation was correlated with left-hemisphere temporal activation, but also with activation that suggests the allocation of more resources to interpretation when natural prosody is provided. Garden-path processing was associated with upregulation in bilateral inferior parietal and right-hemisphere dorsolateral prefrontal and inferior frontal cortex, while differences between the strength and type of plausibility cues were also reflected in activation patterns. Region of interest (ROI) analyses in regions associated with complex syntactic processing are consistent with a role for posterior temporal cortex supporting access to verb argument structure. Furthermore, ROI analyses within left-hemisphere inferior frontal gyrus suggest a division of labour, with the anterior-ventral part primarily involved in syntactic-semantic mismatch detection, the central part supporting structural reanalysis, and the posterior-dorsal part showing a general structural complexity effect.

  2. Near-wall modelling of compressible turbulent flows

    NASA Technical Reports Server (NTRS)

    So, Ronald M. C.

    1990-01-01

    Work was carried out to formulate near-wall models for the equations governing the transport of the temperature-variance and its dissipation rate. With these equations properly modeled, a foundation is laid for their extension together with the heat-flux equations to compressible flows. This extension is carried out in a manner similar to that used to extend the incompressible near-wall Reynolds-stress models to compressible flows. The methodology used to accomplish the extension of the near-wall Reynolds-stress models is examined and the actual extension of the models for the Reynolds-stress equations and the near-wall dissipation-rate equation to compressible flows is given. Then the formulation of the near-wall models for the equations governing the transport of the temperature variance and its dissipation rate is discussed. Finally, a sample calculation of a flat plate compressible turbulent boundary-layer flow with adiabatic wall boundary condition and a free-stream Mach number of 2.5 using a two-equation near-wall closure is presented. The results show that the near-wall two-equation closure formulated for compressible flows is quite valid and the calculated properties are in good agreement with measurements. Furthermore, the near-wall behavior of the turbulence statistics and structure parameters is consistent with that found in incompressible flows.

  3. Advancements in engineering turbulence modeling

    NASA Technical Reports Server (NTRS)

    Shih, T.-H.

    1991-01-01

    Some new developments in two-equation models and second order closure models are presented. Two-equation models (k-epsilon models) have been widely used in computational fluid dynamics (CFD) for engineering problems. Most of low-Reynolds number two-equation models contain some wall-distance damping functions to account for the effect of wall on turbulence. However, this often causes the confusion and difficulties in computing flows with complex geometry and also needs an ad hoc treatment near the separation and reattachment points. A set of modified two-equation models is proposed to remove the aforementioned shortcomings. The calculations using various two-equation models are compared with direct numerical simulations of channel flow and flat boundary layers. Development of a second order closure model is also discussed with emphasis on the modeling of pressure related correlation terms and dissipation rates in the second moment equations. All the existing models poorly predict the normal stresses near the wall and fail to predict the 3-D effect of mean flow on the turbulence (e.g. decrease in the shear stress caused by the cross flow in the boundary layer). The newly developed second order near-wall turbulence model is described and is capable of capturing the near-wall behavior of turbulence as well as the effect of 3-D mean flow on the turbulence.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick and Sloop, Christy

    2011-04-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less

  5. Closure Report for Corrective Action Unit 574: Neptune, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    Corrective Action Unit (CAU) 574 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Neptune' and consists of the following two Corrective Action Sites (CASs), located in Area 12 of the Nevada National Security Site: (1) CAS 12-23-10, U12c.03 Crater (Neptune); and (2) CAS 12-45-01, U12e.05 Crater (Blanca). This Closure Report presents information supporting closure of CAU 574 according to the FFACO (FFACO, 1996 [as amended March 2010]) and the Streamlined Approach for Environmental Restoration Plan for CAU 574 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2011). The following activities were performedmore » to support closure of CAU 574: (1) In situ external dose rate measurements were collected using thermoluminescent dosimeters at CAS 12-45-01, U12e.05 Crater (Blanca). (2) Total effective dose rates were determined at both sites by summing the internal and external dose rate components. (3) A use restriction (UR) was implemented at CAS 12-23-10, U12c.03 Crater (Neptune). Areas that exceed the final action level (FAL) of 25 millirems per year (mrem/yr) based on the Occasional Use Area exposure scenario are within the existing use restricted area for CAU 551. The 25-mrem/yr FAL is not exceeded outside the existing CAU 551 UR for any of the exposure scenarios (Industrial Area, Remote Work Area, and Occasional Use Area). Therefore, the existing UR for CAU 551 is sufficient to bound contamination that exceeds the FAL. (4) An administrative UR was implemented at CAS 12-45-01, U12e.05 Crater (Blanca) as a best management practice (BMP). The 25-mrem/yr FAL was not exceeded for the Remote Work Area or Occasional Use Area exposure scenarios; therefore, a UR is not required. However, because the 25-mrem/yr FAL was exceeded for the Industrial Area exposure scenario, an administrative UR was established as a BMP. UR documentation is included as Appendix B. The UR at CAS 12-23-10, U12c.03 Crater (Neptune), is within the existing UR for CAU 551. Additional postings were not installed, and annual post-closure inspections will be performed in conjunction with the inspections performed for CAU 551. At CAS 12-45-01, U12e.05 Crater (Blanca), the administrative UR does not require postings or inspections. NNSA/NSO requests the following: (1) A Notice of Completion from the Nevada Division of Environmental Protection to NNSA/NSO for closure of CAU 574; and (2) The transfer of CAU 574 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO« less

  6. Historical trends in creel limits, length-based limits, and season restrictions for black basses in the United States and Canada

    USGS Publications Warehouse

    Paukert, C.; McInerny, M.; Schultz, Ronald

    2007-01-01

    We determined for largemouth bass (Micropterus salmoides), smallmouth bass (M. dolomeui), and spotted bass (M. punctulatus) historical trends in state- and province-wide creel limits, length limits, and season closures along with the rationale justifying these regulations. Based on data gathered via mail surveys and the Internet, 55 jurisdictions had state- or province-wide creel limits, minimum length limits, or season closures, with each regulation type enacted as early as pre-1900. Most early regulations were established to protect spawning bass, but providing equitable distribution of harvest and increasing the quality of bass catch or harvest were the most common rationales for current regulations. Spatial and temporal trends in regulations were similar among species, were affected by geographic location, were not affected by angler preference except for season closures, and were frequently uninfluenced by advances in scientific knowledge of black bass biology.

  7. Pediatric lower extremity mower injuries.

    PubMed

    Hill, Sean M; Elwood, Eric T

    2011-09-01

    Lawn mower injuries in children represent an unfortunate common problem to the plastic reconstructive surgeon. There are approximately 68,000 per year reported in the United States. Compounding this problem is the fact that a standard treatment algorithm does not exist. This study follows a series of 7 pediatric patients treated for lower extremity mower injuries by a single plastic surgeon. The extent of soft tissue injury varied. All patients were treated with negative pressure wound therapy as a bridge to definitive closure. Of the 7 patients, 4 required skin grafts, 1 required primary closure, 1 underwent a lower extremity amputation secondary to wounds, and 1 was repaired using a cross-leg flap. Function limitations were minimal for all of our patients after reconstruction. Our basic treatment algorithm is presented with initial debridement followed by the simplest method possible for wound closure using negative pressure wound therapy, if necessary.

  8. OMC Compressor Case

    NASA Technical Reports Server (NTRS)

    Humphrey, W. Donald

    1997-01-01

    This report summarizes efforts expended in the development of an all-composite compressor case. Two pre-production units have been built, one utilizing V-CAP and one utilizing AFR-700B resin systems. Both units have been rig tested at elevated temperatures well above design limit loads. This report discusses the manufacturing processes, test results, and Finite Element Analysis performed. The V-CAP unit was funded by NASA-Lewis Research Center in 1994 under contract number NAS3- 27442 for Development of an All-Composite OMC Compressor Case. This contract was followed by an Air Force study in 1996 to build and identical unit using the AFR-700B resin system in place of the V-CAP system. The second compressor case was funded under U.S. Air Force contract F33615-93-D-5326, Advanced Materials for Aerospace Structures Special Studies (AMAS3), Delivery Order 0021 entitled "Advanced Polymeric Composite Materials and Structures Technology for Advanced High Temperature Gas Turbine Engines.' Initial studies using the V-CAP resin system were undertaken in 1993 under a NASA Lewis contract (NAS3-26829). A first prototype unit was developed in a joint program between Textron-Lycoming (now Allied Signal) and Brunswick (now Lincoln Composites). This unit included composite end closures using low density, high temperature molded end closures. The units was similar in size and shape to a titanium case currently used on the PT-21 0 engine and was funded as part of the integrated High Performance Turbine Engine Technology (EHPTET) initiative of DOD and NASA.

  9. 303-K Storage Facility closure plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Codemore » (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  10. The Installation Funding Dilemma

    DTIC Science & Technology

    2008-04-04

    role in supporting the Army’s plans for supporting base realignment and closure (BRAC) requirements, global defense posture realignment ( GDPR ...relation to their affect on installation management funding. First, the initiative known as the GDPR will return many units to the United States from...three initiatives ( GDPR , BRAC and Modularity) and certain other restationing moves, the Army expects a net gain of about 154,000 personnel at its domestic

  11. A Review of Land and Stream Classifications in Support of Developing a National Ordinary High Water Mark (OHWM) Classification

    DTIC Science & Technology

    2014-08-01

    northern Minnesota, Wisconsin, and Michigan. This region is dominated by igneous and metamorphic rock , with some sedimentary units and a generally...faulted igneous and metamorphic rocks and folded sediments in the Appalachians and flat-lying sedimentary rocks in the Plateau and Catskills. Streams...mixture of igneous, metamorphic , and sedimentary rocks . High relief and coarse materials are typical. Riffle and pool development is largely

  12. Water-level data from wells and test holes through 1991 and potentiometric contours as of 1991 for Yucca Flat, Nevada Test Site, Nye County, Nevada

    USGS Publications Warehouse

    Hale, Glenn S.; Trudeau, Douglas A.; Savard, Charles S.

    1995-01-01

    The underground nuclear-testing program of the U.S. Department of Energy takes place at the Nevada Test Site, about 65 miles northwest of Las Vegas, Nev. Water levels in Yucca Flat may be affected by underground nuclear testing. The purpose of this map report is to present water-level data collected from wells and test holes through December 1991, and to present potentiometric contours representing 1991 water-table conditions in Yucca Flat. Water-level data from 91 sites are shown on the map and include information from 54 sites shown on a 1983 map. Water levels ranged from 519.5 to 2,162.9-feet below land surface. Potentiometric contours are drawn from water-level data to represent the altitude of the water table. Water-level altitudes ranged from about 2,377 ft to 2,770 ft above sea level in the central part of Yucca Flat and from about 4,060 ft to 2,503 ft above sea level in the western and northern parts of Yucca Flat. The water-level data were contoured considering the hydrologic setting, including the concept that water levels within the Cenozoic hydrologic units in the central part of the study area are elevated with respect to water levels in the adjacent and underlying Paleozoic hydrologic units. The most notable feature in the central part of the area is the presence of four ground-water mounds not shown on the 1983 map.

  13. Elevated Radiation Exposure Associated With Above Surface Flat Detector Mini C-Arm Use.

    PubMed

    Martin, Dennis P; Chapman, Talia; Williamson, Christopher; Tinsley, Brian; Ilyas, Asif M; Wang, Mark L

    2017-11-01

    This study aims to test the hypothesis that: (1) radiation exposure is increased with the intended use of Flat Surface Image Intensifier (FSII) units above the operative surface compared with the traditional below-table configuration; (2) this differential increases in a dose-dependent manner; and (3) radiation exposure varies with body part and proximity to the radiation source. A surgeon mannequin was seated at a radiolucent hand table, positioned for volar distal radius plating. Thermoluminescent dosimeters measured exposure to the eyes, thyroid, chest, hand, and groin, for 1- and 15-minute trials from a mini C-arm FSII unit positioned above and below the operating surface. Background radiation was measured by control dosimeters placed within the operating theater. At 1-minute of exposure, hand and eye dosages were significantly greater with the flat detector positioned above the table. At 15-minutes of exposure, hand radiation dosage exceeded that of all other anatomic sites with the FSII in both positions. Hand exposure was increased in a dose-dependent manner with the flat detector in either position, whereas groin exposure saw a dose-dependent only with the flat detector beneath the operating table. These findings suggest that the surgeon's hands and eyes may incur greater radiation exposure compared with other body parts, during routine mini C-arm FSII utilization in its intended position above the operating table. The clinical impact of these findings remains unclear, and future long-term radiation safety investigation is warranted. Surgeons should take precautions to protect critical body parts, particularly when using FSII technology above the operating with prolonged exposure time.

  14. RCRA, superfund and EPCRA hotline training module. Introduction to: Land disposal units (40 cfr parts 264/265, subparts k, l, m, n) updated July 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-07-01

    The module provides an overview of the requirements for landfills, surface impoundments, waste piles, and land treatment units. It summarizes the differences between interim status (Part 265) and permitted (Part 264) standards for land disposal units. It defines `surface impoundment` and distinguishes surface impoundments from tanks and describes surface impoundment retrofitting and retrofitting variance procedures. It explains the connection between land disposal standards, post-closure, and groundwater monitoring.

  15. Kentucky's New Contribution to the Global Community

    ERIC Educational Resources Information Center

    Gott, Tim

    2007-01-01

    Throughout the United States, legislators, business leaders, educators, and other stakeholders are debating the impending crisis of the shortage of mathematicians and scientists in the United States. Several books, such as Thomas Friedman's "The World Is Flat" and Ted Fishman's "China, Inc.," accentuate this growing dilemma.…

  16. 78 FR 16573 - Fisheries of the Northeastern United States; Atlantic Sea Scallop Fishery and Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... (Framework Adjustment 49). Framework 24 also continues the closures of the Delmarva and Elephant Trunk... 25). Framework 24 would close both the Elephant Trunk (ET) area and the Delmarva Access Area (DMV...

  17. 50 CFR 648.231 - Closures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Dogfish Monitoring Committee shall identify and review the relevant sources of management uncertainty to... management uncertainty that were considered, technical approaches to mitigating these sources of uncertainty..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Spiny Dogfish...

  18. 40 CFR 264.603 - Post-closure care.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....603 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES... treatment or storage unit has contaminated soils or ground water that cannot be completely removed or...

  19. Magnetotelluric Data, Mid Valley, Nevada Test Site, Nevada

    USGS Publications Warehouse

    Williams, Jackie M.; Wallin, Erin L.; Rodriguez, Brian D.; Lindsey, Charles R.; Sampson, Jay A.

    2007-01-01

    Introduction The United States Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office (NSO) are addressing ground-water contamination resulting from historical underground nuclear testing through the Environmental Management (EM) program and, in particular, the Underground Test Area (UGTA) project. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow. Ground-water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Rainier Mesa/Shoshone Mountain Corrective Action Unit (CAU). During 2003, the U.S. Geological Survey (USGS), in cooperation with the DOE and NNSA-NSO, collected and processed data at the Nevada Test Site in and near Yucca Flat (YF) to help define the character, thickness, and lateral extent of the pre-Tertiary confining units. We collected 51 magnetotelluric (MT) and audio-magnetotelluric (AMT), stations for that research. In early 2005 we extended that research with 26 additional MT data stations, located on and near Rainier Mesa and Shoshone Mountain (RM-SM). The new stations extended the area of the hydrogeologic study previously conducted in Yucca Flat. This work was done to help refine what is known about the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal was to define the upper clastic confining unit (UCCU). The UCCU is comprised of late Devonian to Mississippian siliciclastic rocks assigned to the Eleana Formation and Chainman Shale. The UCCU underlies the Yucca Flat area and extends westward towards Shoshone Mountain, southward to Buckboard Mesa, and northward to Rainier Mesa. Late in 2005 we collected another 14 MT stations in Mid Valley and in northern Yucca Flat basin. That work was done to better determine the extent and thickness of the UCCU near the southeastern RM-SM CAU boundary with the southwestern YF CAU, and also in the northern YF CAU. The purpose of this report is to release the MT data at those 14 stations. No interpretation of the data is included here.

  20. Secondary plastic closure of gastroschisis is associated with a lower incidence of mechanical ventilation.

    PubMed

    Dariel, Anne; Poocharoen, Wannisa; de Silva, Nicole; Pleasants, Hazel; Gerstle, Justin Ted

    2015-02-01

    Nonsurgical closure after primary silo placement, secondary plastic closure (SPC), has been used as an alternative to secondary surgical closure (SSC) in gastroschisis. The benefits described were closure without formal surgical procedure, cosmetic aspect, and minimization of intra-abdominal pressures. This study compared requirements for mechanical ventilation and general anesthesia, nutritional care, and outcomes between SPC and SSC. We included patients with primary staged-silo reduction with a 1-year minimum follow-up. SPC was performed at bedside with sedation using a nonadherent dressing. SSC was performed in operating room under general anesthesia using standard surgical techniques. This retrospective study included 64 patients, 23 SPC and 41 SSC. The characteristics of the two groups were comparable. Mechanical ventilation was used for 15 SPC and 41 SSC (p=0.0001) with a comparable median duration (5.5 and 6.0 days, not significant [NS]). General anesthesia was required for 9 SPC and 41 SSC (p<0.0001). Complications included one SPC and six SSC with necrotizing enterocolitis, zero SPC and four SSC with intestinal atresia, two SPC and four SSC with small bowel obstruction, zero SPC and one SSC with abdominal compartment syndrome resulting in a short bowel syndrome (NS). Median duration of parenteral nutrition (30 and 27 days), time to first feeds (14 and 14 days), time at or above minimal enteral feeding (22 and 17 days), time to full feeds (31 and 28 days), length of stay (LOS) in neonatal intensive care unit (24 and 23.5 days) and overall hospital LOS (37 and 36 days) were not statistically different between SPC and SSC patients without complications, respectively. These data were comparable for SPC and SSC patients with complications. Five SPC and six SSC developed an umbilical hernia (NS); two patients in each group required a surgical repair (NS). Plastic closure of gastroschisis after primary silo reduction is simple, safe, reproducible, and associated with a significant lower incidence of mechanical ventilation. Nutritional management and length of hospital stay were similar to conventional surgical closure for patients. Plastic closure allows nonoperative management without general anesthesia at patient's bedside, in comparison with surgical closure that must be performed under general anesthesia in the operating room. Plastic closure does not appear to be associated with more umbilical hernias in this retrospective study. Georg Thieme Verlag KG Stuttgart · New York.

  1. A tensegrity model for hydrogen bond networks in proteins.

    PubMed

    Bywater, Robert P

    2017-05-01

    Hydrogen-bonding networks in proteins considered as structural tensile elements are in balance separately from any other stabilising interactions that may be in operation. The hydrogen bond arrangement in the network is reminiscent of tensegrity structures in architecture and sculpture. Tensegrity has been discussed before in cells and tissues and in proteins. In contrast to previous work only hydrogen bonds are studied here. The other interactions within proteins are either much stronger - covalent bonds connecting the atoms in the molecular skeleton or weaker forces like the so-called hydrophobic interactions. It has been demonstrated that the latter operate independently from hydrogen bonds. Each category of interaction must, if the protein is to have a stable structure, balance out. The hypothesis here is that the entire hydrogen bond network is in balance without any compensating contributions from other types of interaction. For sidechain-sidechain, sidechain-backbone and backbone-backbone hydrogen bonds in proteins, tensegrity balance ("closure") is required over the entire length of the polypeptide chain that defines individually folding units in globular proteins ("domains") as well as within the repeating elements in fibrous proteins that consist of extended chain structures. There is no closure to be found in extended structures that do not have repeating elements. This suggests an explanation as to why globular domains, as well as the repeat units in fibrous proteins, have to have a defined number of residues. Apart from networks of sidechain-sidechain hydrogen bonds there are certain key points at which this closure is achieved in the sidechain-backbone hydrogen bonds and these are associated with demarcation points at the start or end of stretches of secondary structure. Together, these three categories of hydrogen bond achieve the closure that is necessary for the stability of globular protein domains as well as repeating elements in fibrous proteins.

  2. Letter Report to Address Comments on the Closure Report for Corrective Action Unit 224: Decon Pad and Septic Systems, Nevada Test Site, Nevada, Revision 0, March 2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2008-03-17

    The Closure Report (CR) for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, was approved by the Nevada Department of Environmental Protection (NDEP) on November 01, 2007. The approval letter contained the following two comments: Comment 1--For 06-05-01, 06-17-04, 06-23-01 provide evidence that the 6 inch VCP pipe originating from building CP-2 is no longer active and sealed to prevent possible future contamination. Comment 2--For the area that includes 06-03-01, provide evidence that active lines are no longer feeding the North and South lagoons and have been sealed to prevent possible future contamination. To address these comments, closuremore » documentation was reviewed, and site visits were conducted to locate and document the areas of concern. Additional fieldwork was conducted in March 2008 to seal the lines and openings described in the two comments. Photographs were taken of the closed drains and lines to document that the NDEP comments were adequately addressed and potential inadvertent discharge to the environment has been eliminated. Investigation and closure documentation was reviewed to identify the locations of potential drains, lines, and other features that could receive and/or transmit liquid. Based on the investigation findings and subsequent closure activities, no openings, distribution boxes, or other features (excluding known floor drains at CP-2) that could receive liquid were found at the CP-2 location (Figure 1), and potential manholes for the north and south sewage lagoons were identified for Corrective Action Site (CAS) 06-03-01 (Figure 2). The distribution box identified in Figure 1 was not located during the investigation and was assumed to have been previously removed.« less

  3. Control of extended-spectrum β-lactamase-producing Enterobacteriaceae nosocomial acquisition in an intensive care unit: A time series regression analysis.

    PubMed

    Boyer, Alexandre; Couallier, Vincent; Clouzeau, Benjamin; Lasheras, Agnes; M'zali, Fatima; Kann, Michael; Rogues, Anne-Marie; Gruson, Didier

    2015-12-01

    This study was undertaken to determine the temporal relationship between implementation of different interventions in an intensive care unit (ICU) and control of endemic nosocomial acquisition of extended-spectrum β-lactamase Enterobacteriaceae (ESBLE). This was a prospective observational study with time-series analysis of the monthly incidence of ESBLE and its predictors. In November 2007, after a 14-month baseline period, an intervention consisting of restriction of third-generation cephalosporins (3 GC) and increased use of alcohol-based hand rubs was implemented. In January 2008, an increased health care worker (HCW):patient ratio was also implemented. In March 2010, the ICU was closed, and patients were moved to a clean ICU. The first intervention resulted in global reduction in 3 GC and increased use of alcohol-based hand rub. A significant change in ESBLE incidence was observed in a full segmented univariate regression analysis (mean change in level, -0.91 ± 0.19; P < .0001). After ICU closure, there was a dramatic reduction in ESBLE acquisition. According to the multivariate model, the ICU closure was the main protective factor. Before ICU closure, an increase in the HCW:patient ratio of 0.1 point tended to be associated with a decreased risk of ESBLE acquisition (relative risk, 0.28; 95% confidence interval, 0.06-1.25; P = .09). This study shows that ICU closure was associated with, but not necessarily the reason for, control of ESBLE cross-transmission in a nonoutbreak setting. Environmental ESBE sources may play a role in cross-transmission. Copyright © 2015 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  4. Gallium-containing polymer brush film as efficient supported Lewis acid catalyst in a glass microreactor.

    PubMed

    Munirathinam, Rajesh; Ricciardi, Roberto; Egberink, Richard J M; Huskens, Jurriaan; Holtkamp, Michael; Wormeester, Herbert; Karst, Uwe; Verboom, Willem

    2013-01-01

    Polystyrene sulfonate polymer brushes, grown on the interior of the microchannels in a microreactor, have been used for the anchoring of gallium as a Lewis acid catalyst. Initially, gallium-containing polymer brushes were grown on a flat silicon oxide surface and were characterized by FTIR, ellipsometry, and X-ray photoelectron spectroscopy (XPS). XPS revealed the presence of one gallium per 2-3 styrene sulfonate groups of the polymer brushes. The catalytic activity of the Lewis acid-functionalized brushes in a microreactor was demonstrated for the dehydration of oximes, using cinnamaldehyde oxime as a model substrate, and for the formation of oxazoles by ring closure of ortho-hydroxy oximes. The catalytic activity of the microreactor could be maintained by periodic reactivation by treatment with GaCl3.

  5. PLATEAU IRIS SYNDROME--CASE SERIES.

    PubMed

    Feraru, Crenguta Ioana; Pantalon, Anca Delia; Chiselita, Dorin; Branisteanu, Daniel

    2015-01-01

    Plateau iris is characterized by closing the anterior chamber angle due to a large ciliary body or due to its anterior insertion that alters the position of iris periphery in respect to the trabecular meshwork. There are two aspects that need to be differentiated: plateau iris configuration and plateau iris syndrome. The first describes a situation when the iris root is flat and the anterior chamber is not shallow, the latter refers to a post laser iridotomy condition in which a patent iridotomy has removed the relative pupillary block, but goniscopically confirmed angle closure recurs without central shallowing of the anterior chamber. Isolated plateau iris syndrome is rare compared to plateau iris configuration. We hereby present two case reports of plateau iris syndrome in young patients who came to an ophthalmologic consult by chance.

  6. Metallization of ultra-thin, non-thiol SAMs with flat-lying molecular units: Pd on 1, 4-dicyanobenzene.

    PubMed

    Eberle, Felix; Metzler, Martin; Kolb, Dieter M; Saitner, Marc; Wagner, Patrick; Boyen, Hans-Gerd

    2010-09-10

    Self-assembled monolayers of 1,4-dicyanobenzene on Au(111) electrodes are studied by cyclic voltammetry, in-situ STM and ex-situ XPS. High-resolution STM images reveal a long-range order of propeller-like assemblies each of which consists of three molecules, all lying flat on the gold substrate with the cyano groups oriented parallel to the metal surface. It is demonstrated that both functional groups can act as complexation sites for metal ions from solution. Surprisingly, such arrangements still allow the metal to be deposited on top of the molecules by electrochemical reduction despite the close vicinity to the Au surface. The latter is demonstrated by angle-resolved XPS which unequivocally shows that the metal indeed resides on top of the organic layer rather than underneath, despite the flat arrangement of the molecules.

  7. A Preliminary Investigation of The Structure of Southern Yucca Flat, Massachusetts Mountain, and CP Basin, Nevada Test Site, Nevada, Based on Geophysical Modeling

    USGS Publications Warehouse

    Phelps, Geoffrey A.; Justet, Leigh; Moring, Barry C.; Roberts, Carter W.

    2006-01-01

    New gravity and magnetic data collected in the vicinity of Massachusetts Mountain and CP basin (Nevada Test Site, NV) provides a more complex view of the structural relationships present in the vicinity of CP basin than previous geologic models, helps define the position and extent of structures in southern Yucca Flat and CP basin, and better constrains the configuration of the basement structure separating CP basin and Frenchman Flat. The density and gravity modeling indicates that CP basin is a shallow, oval-shaped basin which trends north-northeast and contains ~800 m of basin-filling rocks and sediment at its deepest point in the northeast. CP basin is separated from the deeper Frenchman Flat basin by a subsurface ridge that may represent a Tertiary erosion surface at the top of the Paleozoic strata. The magnetic modeling indicates that the Cane Spring fault appears to merge with faults in northwest Massachusetts Mountain, rather than cut through to Yucca Flat basin and that the basin is downed-dropped relative to Massachusetts Mountain. The magnetic modeling indicates volcanic units within Yucca Flat basin are down-dropped on the west and supports the interpretations of Phelps and KcKee (1999). The magnetic data indicate that the only faults that appear to be through-going from Yucca Flat into either Frenchman Flat or CP basin are the faults that bound the CP hogback. In general, the north-trending faults present along the length of Yucca Flat bend, merge, and disappear before reaching CP hogback and Massachusetts Mountain or French Peak.

  8. Closure Report for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada, Revision 0 with Errata Sheet and ROTC 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The purpose of this CR is to document that the closure of CAU 5 complied with the NDEP-approved CAP closure requirements (NNSA/NSO, 2004). The closure activities specified in the CAP were based on the recommendations presented in the corrective action decision document (CADD) (NNSA/NSO, 2003). ROTC 1: The UR form was updated to the current format to include a. more detailed description of the UR and maintenance requirements. Information was edited due to the change of UR signs at the site to UR monuments/signs. The maintenance frequency was changed to annually because sign damage due to high winds was evidencedmore » during recent site inspections. The coordinates for the UR were originally based on NAD 27 and were modified to NAD 83 to comply with the most recent M&O database requirements. The modifications identified in this ROTC will supersede the existing posting requirements for the UR at CASs 06-1S-02 and 06-15-03 as identified in the CAU 5 CADD; CAU 5 CR; and the UR form associated with CASs 06-15-02 and 06-15-03.« less

  9. 78 FR 27088 - Fisheries of the Northeastern United States; Atlantic Sea Scallop Fishery and Northeast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ...). Framework 24 also continues the closures of the Delmarva and Elephant Trunk scallop access areas, refines... Scallop Access Areas Framework 24 closes both the Elephant Trunk (ET) area and the Delmarva Access Area...

  10. 50 CFR 648.141 - Closure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Bass Monitoring Committee shall identify and review the relevant sources of management uncertainty to... sources of management uncertainty that were considered, technical approaches to mitigating these sources..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Black Sea Bass...

  11. 50 CFR 648.121 - Closures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management uncertainty to recommend ACTs for the commercial and recreational fishing sectors as part of the... sources of management uncertainty that were considered, technical approaches to mitigating these sources..., DEPARTMENT OF COMMERCE FISHERIES OF THE NORTHEASTERN UNITED STATES Management Measures for the Scup Fishery...

  12. BACTERIA, BEACHES AND SWIMMABLE WATERS: INTRODUCING VIRTUAL BEACH

    EPA Science Inventory

    Safe beaches meet water quality standards and are valued for their aesthetics and the recreational opportunities that they afford. In the United States recreational water quality assessments and beach closure decisions are presently based on samples of enterococci or Escherichia ...

  13. Technological development of cylindrical and flat shaped high energy density capacitors. [using polymeric films

    NASA Technical Reports Server (NTRS)

    Zelik, J. A.; Parker, R. D.

    1977-01-01

    Cylindrical wound metallized film capacitors rated 2 micron F 500 VDC that had an energy density greater than 0.3 J/g, and flat flexible metallized film capacitors rated at 2 micron F 500 VDC that had an energy density greater than 0.1 J/g were developed. Polysulfone, polycarbonate, and polyvinylidene fluoride (PVF2) were investigated as dielectrics for the cylindrical units. PVF2 in 6.0 micron m thickness was employed in the final components of both types. Capacitance and dissipation factor measurements were made over the range 25 C to 100 C, and 10 Hz to 10 kHz. No pre-life-test burning was performed, and six of ten cylindrical units survived a 2500 hour AC plus DC lift test. Three of the four failures were infant mortality. All but two of the flat components survived 400 hours. Finished energy densities were 0.104 J/g at 500 V and 0.200 J/g at 700 V, the energy density being limited by the availability of thin PVF2 films.

  14. Phase II Transport Model of Corrective Action Unit 98: Frenchman Flat, Nevada Test Site, Nye County, Nevada, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gregg Ruskuaff

    This document, the Phase II Frenchman Flat transport report, presents the results of radionuclide transport simulations that incorporate groundwater radionuclide transport model statistical and structural uncertainty, and lead to forecasts of the contaminant boundary (CB) for a set of representative models from an ensemble of possible models. This work, as described in the Federal Facility Agreement and Consent Order (FFACO) Underground Test Area (UGTA) strategy (FFACO, 1996; amended 2010), forms an essential part of the technical basis for subsequent negotiation of the compliance boundary of the Frenchman Flat corrective action unit (CAU) by Nevada Division of Environmental Protection (NDEP) andmore » National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Underground nuclear testing via deep vertical shafts was conducted at the Nevada Test Site (NTS) from 1951 until 1992. The Frenchman Flat area, the subject of this report, was used for seven years, with 10 underground nuclear tests being conducted. The U.S. Department of Energy (DOE), NNSA/NSO initiated the UGTA Project to assess and evaluate the effects of underground nuclear tests on groundwater at the NTS and vicinity through the FFACO (1996, amended 2010). The processes that will be used to complete UGTA corrective actions are described in the “Corrective Action Strategy” in the FFACO Appendix VI, Revision No. 2 (February 20, 2008).« less

  15. Storage change in a flat-lying fracture during well tests

    NASA Astrophysics Data System (ADS)

    Murdoch, Lawrence C.; Germanovich, Leonid N.

    2012-12-01

    The volume of water released from storage per unit head drop per volume of an REV is a basic quantity in groundwater hydrology, but the details of the process of storage change in the vicinity of a well are commonly overlooked. We characterize storage change in a flat-lying fracture or thin sedimentary bed through the apparent hydraulic compliance,Cf, the change in aperture of the fracture or thickness of the layer per unit change in pressure. The results of theoretical analyses and field measurements show that Cf increases with time near the well during pumping, but it drops suddenly and may become negative at the beginning of recovery during a well test. Profiles of Cfincrease with radial distance from a well, but they are marked by a sharp increase and a sharp decrease at the edge of the region affected by the wellbore pressure transient. The conventional view in groundwater hydrology is that storage change at a point is proportional to the local change in pressure, which requires that the hydraulic compliance is uniform and constant. It appears that this conventional view is a simplification of a process that varies in both space and time and can even take on negative values. This simplification may be a source of uncertainty when interpreting well tests and extensometer records or predicting long-term well performance.

  16. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada, for Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, Alissa J.

    2015-01-01

    This report serves as the combined annual report for post-closure activities for several Corrective Action Units (CAUs). The locations of the sites are shown in Figure 1. This report covers fiscal year 2014 (October 2013–September 2014). The post-closure requirements for these sites are described in Resource Conservation and Recovery Act Permit Number NEV HW0101 and summarized in each CAU-specific section in Section 1.0 of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted semiannually at CAUs 90 and 91 and quarterly atmore » CAUs 92, 110, 111, and 112. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 0.50 inches (in.) in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 in. in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. In addition to visual inspections, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted at CAU 110. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. The results of the vegetation surveys and an analysis of the soil moisture monitoring data at CAU 110 are presented in this report. Results of additional monitoring at CAU 111 are documented annually in the Nevada National Security Site Waste Management Monitoring Report Area 3 and Area 5 Radioactive Waste Management Sites and in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site, which will be prepared in approximately June 2015. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. It is recommended to continue inspections and monitoring as scheduled.« less

  17. Phase I Contaminant Transport Parameters for the Groundwater Flow and Contaminant Transport Model of Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada Test Site, Nye County, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John McCord

    2007-09-01

    This report documents transport data and data analyses for Yucca Flat/Climax Mine CAU 97. The purpose of the data compilation and related analyses is to provide the primary reference to support parameterization of the Yucca Flat/Climax Mine CAU transport model. Specific task objectives were as follows: • Identify and compile currently available transport parameter data and supporting information that may be relevant to the Yucca Flat/Climax Mine CAU. • Assess the level of quality of the data and associated documentation. • Analyze the data to derive expected values and estimates of the associated uncertainty and variability. The scope of thismore » document includes the compilation and assessment of data and information relevant to transport parameters for the Yucca Flat/Climax Mine CAU subsurface within the context of unclassified source-term contamination. Data types of interest include mineralogy, aqueous chemistry, matrix and effective porosity, dispersivity, matrix diffusion, matrix and fracture sorption, and colloid-facilitated transport parameters.« less

  18. School Mathematics Study Group, Unit Number Two. Chapter 3 - Informal Algorithms and Flow Charts. Chapter 4 - Applications and Mathematics Models.

    ERIC Educational Resources Information Center

    Stanford Univ., CA. School Mathematics Study Group.

    This is the second unit of a 15-unit School Mathematics Study Group (SMSG) mathematics text for high school students. Topics presented in the first chapter (Informal Algorithms and Flow Charts) include: changing a flat tire; algorithms, flow charts, and computers; assignment and variables; input and output; using a variable as a counter; decisions…

  19. 76 FR 50186 - Surplus Properties

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Report, as approved, and following screening with Federal agencies and Department of Defense components... DEPARTMENT OF DEFENSE Department of the Army Surplus Properties AGENCY: Department of the Army, Do... have been determined surplus to the United States needs in accordance with the Defense Base Closure and...

  20. Safety and feasibility of intra-operative device closure of atrial septal defect with transthoracic minimal invasion.

    PubMed

    Chen, Qiang; Cao, Hua; Zhang, Gui-Can; Chen, Liang-Wan; Chen, Dao-Zhong

    2012-01-01

    The study aims to evaluate the safety and feasibility of intra-operative device closure of atrial septal defect with transthoracic minimal invasion. From May 2006 to June 2009, 252 patients with secundum-type atrial septal defect closure were enrolled in our institution. The patients were divided into two groups, with 182 patients in group I with intra-operative device closure and 72 in group II with surgical closure. In group I, the patients' age ranged from 3 months to 62 years (mean±standard deviation, 19.0±16.7 years). This approach involved a transthoracic minimal invasion that was performed after full evaluation of the atrial septal defect by transthoracic echocardiography, deploying the device through the delivery sheath to occlude the atrial septal defect. In group I, 180 patients were occluded successfully under this approach. The size of the occluder device implanted ranged from 6 to 48 mm. Minor complications occurred, which included transient arrhythmias (n=23) and pleural effusion (n=15). Two patients with postoperative cardiac arrest were successfully cardiopulmonary resuscitated. Another two patients with occluder dislodged back into the right atrium were turned to surgical repair with cardiopulmonary bypass on the postoperative day. In group II, all patients were occluded successfully, and almost all patients needed blood transfusion and suffered from various minor complications. All discharged patients were followed up for 1-5 years. During this period, we found no recurrence, no thrombosis, even no device failure. In our comparative studies, group II had significantly longer intensive care unit (ICU) stay and hospital stay than group I (p<0.05). The cost for group I was less than group II (p<0.05). Intra-operative device closure of atrial septal defect with transthoracic minimal invasion is a safe and feasible technique. It had the advantages of cost savings, yielding better cosmetic results, and leaving less trauma than surgical closure.

  1. Open abdomen with vacuum-assisted wound closure and mesh-mediated fascial traction in patients with complicated diffuse secondary peritonitis: A single-center 8-year experience.

    PubMed

    Tolonen, Matti; Mentula, Panu; Sallinen, Ville; Rasilainen, Suvi; Bäcklund, Minna; Leppäniemi, Ari

    2017-06-01

    Open abdomen (OA) treatment in patients with peritonitis is increasing worldwide. Various temporary abdominal closure devices are being used. This study included patients with complicated diffuse secondary peritonitis, OA, and vacuum-assisted wound closure and mesh-mediated fascial traction (VAWCM). The aim of this study was to describe mortality and major morbidity in terms of delayed primary fascial closure and enteroatmospheric fistula rates. This was a single-academic-center retrospective study of consecutive patients with diffuse peritonitis, OA, and VAWCM between years 2008 and 2016. Descriptive and univariate analyses were performed. Forty-one patients were identified and analyzed. Median age was 59 years, preoperative septic shock was diagnosed in 54% (n = 22), and 59% (n = 24) had a postoperative peritonitis. Mortality was 29% (n = 12), and 76% (n = 31) of patients were admitted in the intensive care unit. The median duration of OA was 7 days with a median of two dressing changes. Delayed primary fascial closure rate among survivors was 92% (n = 33), and enteroatmospheric fistulas developed in 7% (n = 3). In a subgroup analysis, patients with OA in the primary laparotomy for peritonitis (n = 27) were compared with patients with OA in the subsequent laparotomies (n = 14). There were no significant differences between groups. The VAWCM technique in patients with complicated secondary diffuse peritonitis and OA yields excellent results in terms of delayed primary fascial closure rate and a low number of enteroatmospheric fistulas. It seems to be safe to close the abdomen at the index laparotomy, if possible, even if there is a risk of a need of OA later. Therapeutic/care management study, level IV.

  2. Evaluation of New Zealand’s High-Seas Bottom Trawl Closures Using Predictive Habitat Models and Quantitative Risk Assessment

    PubMed Central

    Penney, Andrew J.; Guinotte, John M.

    2013-01-01

    United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas. PMID:24358162

  3. Post-Closure Inspection Report for the Tonopah Test Range, Nevada. For Calendar Year 2015, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Petrello, Jaclyn

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2015 and includes inspection and repair activities completed at the following CAUs; CAU 400: Bomblet Pit and Five Points Landfill (TTR); CAU 407: Roller Coaster RadSafe Area (TTR); CAU 424: Area 3 Landfill Complexes (TTR); CAU 453: Area 9 UXO Landfill (TTR); and CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved closure reports and subsequent correspondence with the Nevada Division ofmore » Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. The annual post-closure inspections were conducted on May 12, 2015. Maintenance was required at CAU 453. Cracking along the north trench was repaired. One monument is missing at CAU 424; it will be replaced in 2016. Postings at CAUs 407, 424, 453, and 487 contain contact information for TTR Security. It was noted that protocols may not be in place to ensure that the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) is notified if access is needed at these sites. NNSA/NFO is working with the U.S. Air Force and Sandia to determine whether more appropriate contact information or new protocols are warranted for each CAU. Based on these inspections, there has not been a significant change in vegetation, and vegetation monitoring was not recommended at CAU 400 or CAU 407 in 2015.« less

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, for Calendar Year 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Silvas, A. J.

    2014-03-03

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2013 and includes inspection and repair activities completed at the following CAUs: • CAU 400: Bomblet Pit and Five Points Landfill (TTR) • CAU 407: Roller Coaster RadSafe Area (TTR) • CAU 424: Area 3 Landfill Complexes (TTR) • CAU 453: Area 9 UXO Landfill (TTR) • CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports and subsequent correspondence withmore » the Nevada Division of Environmental Protection. The post-closure inspection plans and subsequent correspondence modifying the requirements for each CAU are included in Appendix B. The inspection checklists are included in Appendix C. Field notes are included in Appendix D. Photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted on May 14, 2013. Maintenance was performed at CAU 400, CAU 424, and CAU 453. At CAU 400, animal burrows were backfilled. At CAU 424, erosion repairs were completed at Landfill Cell A3-3, subsidence was repaired at Landfill Cell A3-4, and additional lava rock was placed in high-traffic areas to mark the locations of the surface grade monuments at Landfill Cell A3-3 and Landfill Cell A3-8. At CAU 453, two areas of subsidence were repaired and animal burrows were backfilled. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2013. The vegetation monitoring report is included in Appendix F.« less

  5. Patent foramen ovale closure following cryptogenic stroke or transient ischaemic attack: Long-term follow-up of 301 cases.

    PubMed

    Mirzaali, Mikaeil; Dooley, Maureen; Wynne, Dylan; Cooter, Nina; Lee, Lorraine; Haworth, Peter; Saha, Romi; Gainsborough, Nicola; Hildick-Smith, David

    2015-11-15

    Patent foramen ovale has been identified as a conduit for paradoxical embolism resulting in cryptogenic stroke or transient ischemic attack (TIA). We aimed to establish rates of death, recurrent stroke or TIA among patients undergoing PFO closure for stroke or TIA at our unit. A retrospective analysis of all PFO closure patients was performed between May 2004 and January 2013. Follow up was performed by mortality tracing using the Medical Research Information Service of the Office of National Statistics. With regard to stroke or TIA recurrence, written consent forms and questionnaires were mailed with follow up telephone calls. Medical notes and imaging records were consulted where adverse events were noted. 301 patients aged 48.6 ± 11.0 years, 54.4% male, with ≥1 thromboembolic neurovascular event had percutaneous PFO closure with one of eight devices, with successful implantation in 99% of cases. Follow-up duration was 40.2 ± 26.2 months (range 1.3-105.3); complete in 301 patients for mortality (100%) and 283 patients (94.0%) for neurovascular events. Two patients died during follow-up (respiratory failure n = 1; road traffic accident n = 1). Recurrent stroke (MRI or CT confirmed) was observed in five patients (0.5%; 0.55 per 100 person-years) and TIA in 9 (1.1%; 0.98 per 100 person-years). Atrial fibrillation requiring treatment was documented in 14 patients (1.7%). Percutaneous PFO closure in patients with cryptogenic stroke or TIA is a safe treatment with a low incidence of procedural complications and recurrent neurovascular events. Registry data like these may help to demonstrate the utility of PFO closure in stroke. © 2015 Wiley Periodicals, Inc.

  6. Evaluation of New Zealand's high-seas bottom trawl closures using predictive habitat models and quantitative risk assessment.

    PubMed

    Penney, Andrew J; Guinotte, John M

    2013-01-01

    United Nations General Assembly Resolution 61/105 on sustainable fisheries (UNGA 2007) establishes three difficult questions for participants in high-seas bottom fisheries to answer: 1) Where are vulnerable marine systems (VMEs) likely to occur?; 2) What is the likelihood of fisheries interaction with these VMEs?; and 3) What might qualify as adequate conservation and management measures to prevent significant adverse impacts? This paper develops an approach to answering these questions for bottom trawling activities in the Convention Area of the South Pacific Regional Fisheries Management Organisation (SPRFMO) within a quantitative risk assessment and cost : benefit analysis framework. The predicted distribution of deep-sea corals from habitat suitability models is used to answer the first question. Distribution of historical bottom trawl effort is used to answer the second, with estimates of seabed areas swept by bottom trawlers being used to develop discounting factors for reduced biodiversity in previously fished areas. These are used in a quantitative ecological risk assessment approach to guide spatial protection planning to address the third question. The coral VME likelihood (average, discounted, predicted coral habitat suitability) of existing spatial closures implemented by New Zealand within the SPRFMO area is evaluated. Historical catch is used as a measure of cost to industry in a cost : benefit analysis of alternative spatial closure scenarios. Results indicate that current closures within the New Zealand SPRFMO area bottom trawl footprint are suboptimal for protection of VMEs. Examples of alternative trawl closure scenarios are provided to illustrate how the approach could be used to optimise protection of VMEs under chosen management objectives, balancing protection of VMEs against economic loss to commercial fishers from closure of historically fished areas.

  7. Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick; Alvarado, Juan

    This report serves as the combined annual report for post-closure activities for the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment CAU 91, Area 3 U-3fi Injection Well CAU 92, Area 6 Decon Pond Facility CAU 110, Area 3 WMD U-3ax/bl Crater CAU 111, Area 5 WMD Retired Mixed Waste Pits CAU 112, Area 23 Hazardous Waste Trenches The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report. Site inspections are conducted annually at CAUs 90, 91, and 112; semiannually at CAUs 92 and 110;more » and quarterly at CAU 111. Additional inspections are conducted at CAU 92 if precipitation occurs in excess of 1.0 inches in a 24-hour period and at CAU 111 if precipitation occurs in excess of 1.0 inch in a 24-hour period. Inspections include an evaluation of the condition of the units, including covers, fences, signs, gates, and locks. At CAU 110, soil moisture monitoring, vegetation evaluations, and subsidence surveys are conducted in addition to the visual inspections. At CAU 111, soil moisture monitoring, vegetation evaluations, subsidence surveys, direct radiation monitoring, air monitoring, radon flux monitoring, and groundwater monitoring are conducted. This report will address all monitoring items notes above except groundwater monitoring. Groundwater monitoring is documented in the Nevada National Security Site Data Report: Groundwater Monitoring Program Area 5 Radioactive Waste Management Site. All required inspections, maintenance, and monitoring were conducted in accordance with the post-closure requirements of the permit. Revision 4 of Permit NEV HW0101 was issued effective December 10, 2015, and remains in effect until December 10, 2020.« less

  8. State Environmental Policy Act (SEPA) environmental checklist forms for 304 Concretion Facility Closure Plan. Revision 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The 300 Area of the Hanford Site contains reactor fuel manufacturing facilities and several research and development laboratories. Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 304 Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 304 Facility is now undergoing closure asmore » defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 304 Facility, the history of materials and waste managed, and the procedures that will be followed to close the 304 Facility. The 304 Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.« less

  9. Imaging the Peruvian flat slab with Rayliegh wave tomography

    NASA Astrophysics Data System (ADS)

    Knezevic Antonijevic, Sanja

    In subduction zones the oceanic plates descend at a broad range of dip angles. A "flat slab" is an oceanic plate that starts to subduct steeply, but bends at 100 km depth and continues almost horizontally for several hundred kilometers. This unusual slab geometry has been linked to various geologic features, including the cessation of arc volcanism, basement core uplifts removed far from subducting margins, and the formation of high plateaus. Despite the prevalence of flat slabs worldwide since the Proterozoic, questions on how flat slabs form, persist, and re-steepen remains a topic of ongoing research. Even less clear is how this phenomenon relates to unusual features observed at the surface. To better understand the causes and consequences of slab flattening I focus on the Peruvian flat slab. This is not only the biggest flat slab region today, but due to the oblique angle at which the Nazca Plate subducts under the South American Plate, it also provides unique opportunity to get insights into the temporal evolution of the flat slab. Using ambient noise and earthquake-generated Rayleigh waves recorded at several contemporary dense seismic networks, I was able to perform unprecedentedly high resolution imaging of the subduction zone in southern Peru. Surprisingly, instead of imaging a vast flat slab region as expected, I found that the flat slab tears and re-steepens north of the subducting Nazca Ridge. The change in slab geometry is associated with variations in the slab's internal strain along strike, as inferred from slab-related anisotropy. Based on newly-discovered features I discuss the critical role of the subducting ridges in the formation and longevity of flat slabs. The slab tear created a new mantle pathway between the torn slab and the flat slab remnant to the east, and is possibly linked to the profound low velocity anomaly located under the eastern corner of the flat slab. Finally, I re-evaluate the connection between slab flattening and volcanic patterns at the surface. These findings have important implications for all present-day and paleo-flat slab regions, such as the one proposed for the western United States during the Laramide orogeny 80-55 Ma.

  10. Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 544: Cellars, Mud Pits, and Oil Spills, Nevada Test Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Krauss

    2010-07-01

    This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 544, Cellars, Mud Pits, and Oil Spills, identified in the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 544 comprises the following 20 corrective action sites (CASs) located in Areas 2, 7, 9, 10, 12, 19, and 20 of the Nevada Test Site (NTS): • 02-37-08, Cellar & Mud Pit • 02-37-09, Cellar & Mud Pit • 07-09-01, Mud Pit • 09-09-46, U-9itsx20 PS #1A Mud Pit • 10-09-01, Mud Pit • 12-09-03, Mud Pit • 19-09-01, Mudmore » Pits (2) • 19-09-03, Mud Pit • 19-09-04, Mud Pit • 19-25-01, Oil Spill • 19-99-06, Waste Spill • 20-09-01, Mud Pits (2) • 20-09-02, Mud Pit • 20-09-03, Mud Pit • 20-09-04, Mud Pits (2) • 20-09-06, Mud Pit • 20-09-07, Mud Pit • 20-09-10, Mud Pit • 20-25-04, Oil Spills • 20-25-05, Oil Spills This plan provides the methodology for field activities needed to gather the necessary information for closing each CAS. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 544 using the SAFER process. Using the approach approved for previous mud pit investigations (CAUs 530–535), 14 mud pits have been identified that • are either a single mud pit or a system of mud pits, • are not located in a radiologically posted area, and • have no evident biasing factors based on visual inspections. These 14 mud pits are recommended for no further action (NFA), and further field investigations will not be conducted. For the sites that do not meet the previously approved closure criteria, additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible recommendation for closure of the remaining CASs in CAU 544. This will be presented in a closure report (CR) that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on April 27, 2010, by representatives of NDEP and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each CAS in CAU 544. The DQO process developed for this CAU identified the following expected closure options: (1) investigation and confirmation that no contamination exists above the final action levels (FALs) leading to an NFA declaration, (2) characterization of the nature and extent of contamination leading to closure in place with use restrictions, (3) clean closure by remediation and verification, (4) closure in place with use restrictions with no investigation if CASs are in crater areas that have been determined to be unsafe to enter, or (5) NFA if the mud pit CAS meets the criteria established during the CAUs 530–535 SAFER investigation. The following summarizes the SAFER activities that will support the closure of CAU 544: • Perform visual inspection of all CASs. • Perform site preparation activities (e.g., utilities clearances, construction of temporary site exclusion zones). • Removal of easily managed, nonhazardous, and nonradioactive debris, including vegetation (e.g., tumbleweeds), at various CASs that interfere with sampling, if required to inspect soil surface or collect soil sample. • Collect environmental samples from designated target populations (e.g., mud pits, cellars, stained soil) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish NFA as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. • If a COC is present at a CAS, either - Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or - Establish closure in place as the corrective action and implement the appropriate use restrictions. • Confirm the preferred closure option is sufficient to protect human health and the environment.« less

  11. Groundwater-Discharge Wetlands in the Tanana Flats, Interior Alaska

    DTIC Science & Technology

    1991-07-01

    Water *Hemlock Duckweed Bladderwort Bcba Cal a Floating Mat Water 9112214 0 1im For conversion of SI metric units to U.S./British customary units of...Utricularia sp.) and duckweed (Lemna sp,.). classified as "fens" (Gabriel and Talbot 1984). There Mosses do not appear to contribute to the structure

  12. Intraoperative device closure of atrial septal defects with inferior vena cava rim deficiency: a safe alternative to surgical repair.

    PubMed

    Chen, Qiang; Chen, Liang-Wan; Cao, Hua; Zhang, Gui-Can; Chen, Dao-Zhong; Zhang, Hui

    2011-03-01

    Our objective was to evaluate the safety and feasibility of intraoperative device closure of atrial septal defects with inferior vena cava rim deficiency. From January 2005 to December 2008, we enrolled 65 patients who had a secundum atrial septal defect with inferior vena cava rim deficiency closure in our institution. Patients were divided into 2 groups: 35 patients in group I underwent intraoperative device closure with a right lateral minithoracotomy and 30 in group II underwent open cardiac repair with a right lateral thoracotomy and cardiopulmonary bypass. Intraoperative device closure involved a minimal intercostal incision that was performed after full evaluation of the atrial septal defect by transthoracic echocardiography and the insertion of the device through the delivery sheath to occlude the atrial septal defect. The procedure was successful in all patients. In group I, the diameter of the atrial septal defect ranged from 30 to 44 mm (mean, 35.3 ± 3.9 mm), and the size of the implanted occluder ranged from 34 to 48 mm (mean, 40 ± 2.1 mm). The total occlusion rate was 82.9% immediately after the operation, 97.1% at 3 months, and 100% at 12 and 24 months of follow-up. In group II, all patients had successful closure. A follow-up period of 12 to 24 months was obtained in both groups. During the follow-up, there was no recurrence, thrombosis, or device failure. In our comparative studies, group II had significantly longer operative time, intensive care unit stay, and hospital stay than group I (P < .001). The cost of group I was less than that of group II (20,450.9 ± 840.8 RMB vs 25,884.9 ± 701.8; P < .001). Intraoperative device closure of atrial septal defects with inferior vena cava rim deficiency is a safe and feasible technique. It has the advantages of cost savings, cosmetic results, and less trauma than surgical closure. Early and midterm results are encouraging. Crown Copyright © 2011. Published by Mosby, Inc. All rights reserved.

  13. 20. VIEW OF THE INCINERATOR. DURING ROUTINE BUILDING OPERATIONS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF THE INCINERATOR. DURING ROUTINE BUILDING OPERATIONS IN DECEMBER 1988, A HEAT PLUME WAS GENERATED THAT WAS REGISTERED ON FILM BY A PASSING AIRCRAFT. OFFICIALS WITH THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (USEPA) BELIEVED THAT ILLEGAL OPERATIONS WERE BEING CONDUCTED. THE USEPA USED THIS OPPORTUNITY TO CONVINCE AUTHORITIES TO ISSUE A WARRANT TO ENTER THE ROCKY FLATS PLANT AND INVESTIGATE THE ALLEGATION. (4/98) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  14. Eye care for patients receiving neuromuscular blocking agents or propofol during mechanical ventilation.

    PubMed

    Lenart, S B; Garrity, J A

    2000-05-01

    The presence of a corneal reflex and the ability to maintain eye closure are instrumental in protecting the cornea. Use of neuromuscular blocking agents or propofol can result in impaired eyelid closure and loss of corneal reflex, leading to corneal exposure. The cornea is then at risk for drying, infection, and scarring, which may lead to permanent visual loss. To determine whether applying artificial tear ointment to the eyes of paralyzed or heavily sedated patients receiving mechanical ventilation decreases the prevalence of exposure keratitis more than does passive closure of the eyelid. A prospective, randomized control trial was done. The sample was 50 patients in the intensive care unit receiving either neuromuscular blocking agents or propofol during mechanical ventilation. In each patient, artificial tear ointment was applied to one eye; passive closure of the eyelid was used for the other eye (control eye). Nine patients had evidence of exposure keratitis in the untreated eye, and 2 had corneal abrasions in both the treated and the control eyes. The remaining 39 patients did not have corneal abrasions in either eye. Use of the artificial tear ointment was more effective in preventing corneal exposure than was passive eyelid closure (P = .004). Eye care with a lubricating ointment on a regular, set schedule can effectively reduce the prevalence of corneal abrasions in patients who are either paralyzed or heavily sedated and thus can help prevent serious complications such as corneal ulceration, infection, and visual loss.

  15. A ten-year review of enterocutaneous fistulas after laparotomy for trauma.

    PubMed

    Fischer, Peter E; Fabian, Timothy C; Magnotti, Louis J; Schroeppel, Thomas J; Bee, Tiffany K; Maish, George O; Savage, Stephanie A; Laing, Ashley E; Barker, Andrew B; Croce, Martin A

    2009-11-01

    In the era of open abdomen management, the complication of enterocutaneous fistula (ECF) seems to be increasing in frequency. In nontrauma patients, reported mortality rates are 7% to 20%, and spontaneous closure rates are approximately 25%. This study is the largest series of ECFs reported exclusively caused by trauma and examines the characteristics unique to this population. Trauma patients with an ECF at a single regional trauma center over a 10-year period were reviewed. Parameters studied included fistula output, site, nutritional status, operative history, and fistula resolution (spontaneous vs. operative). Approximately 2,224 patients received a trauma laparotomy and survived longer than 4 days. Of these, 43 patients (1.9%) had ECF. The rate of ECF in men was 2.22% and 0.74% in women. Patients with open abdomen had a higher ECF incidence (8% vs. 0.5%) and lower rate of spontaneous closure (37% vs. 45%). Spontaneous closure occurred in 31% with high-output fistulas, 13% with medium output, and 55% with low output. The mortality rate of ECF was 14% after an average stay of 59 days in the intensive care unit. With damage-control laparotomies, the traumatic ECF rate is increasing and is a different entity than nontraumatic ECF. Although the two populations have similar mortality rates, the trauma cohort demonstrates higher spontaneous closure rates and a curiously higher rate of development in men. Fistula output was not predictive of spontaneous closure.

  16. U.S. Global Defense Posture, 1783-2011

    DTIC Science & Technology

    2012-01-01

    in global affairs to further the nation’s interests. Second, as a consequence of its victory in the Spanish -American War of 1898, the United States...planning process . Despite their importance, the Pentagon needs to ensure that its global defense posture is developed from a top-down, not a bottom-up...to the continental United States (CONUS) or leaving it, both of which have implications for the base realignment and closure process . Despite this

  17. Kyrgyzstan and the Status of the U.S. Manas Airbase: Context and Implications

    DTIC Science & Technology

    2009-07-01

    United States, after the United States had criticized the Uzbek government for repressive actions against civilians. Some of the functions of this...New Zealand, Norway, Poland , South Korea, Spain, and Turkey. Among the few legislators who opposed closing the airbase, Bakyt Beshimov, the leader of...Department of Defense. Roundtable With Secretary of Defense Robert Gates, Krakow, Poland , February 20, 2009. 26 Saban Kardas “Will the Closure of

  18. Improvement of rolling 6 mm thin plates in plate rolling mill PT. Krakatau Posco

    NASA Astrophysics Data System (ADS)

    Pujiyanto, Hamdani

    2017-01-01

    A 6-mm thin plate is difficult to produce especially if the product requires wide size and high strength. Flatness is the main quality issue in rolling 6-mm plate using a 4-high reversing mill which use ±1100-mm work roll. Thus some methods are applied to overcome such issue in order to comply to customer quality requirement. Pre-rolling, rolling, and post-rolling conditions have to be considered comprehensively. Roll unit management will be the key factor before rolling condition. The roll unit itself has a significant impact on work roll crown wearness in relation with work roll intial crown and thermal crown. Work roll crown along with the modification of hydraulic gap control (HGC) could directly alter the flatness of the plate.

  19. Compact localized states and flat-band generators in one dimension

    NASA Astrophysics Data System (ADS)

    Maimaiti, Wulayimu; Andreanov, Alexei; Park, Hee Chul; Gendelman, Oleg; Flach, Sergej

    2017-03-01

    Flat bands (FB) are strictly dispersionless bands in the Bloch spectrum of a periodic lattice Hamiltonian, recently observed in a variety of photonic and dissipative condensate networks. FB Hamiltonians are fine-tuned networks, still lacking a comprehensive generating principle. We introduce a FB generator based on local network properties. We classify FB networks through the properties of compact localized states (CLS) which are exact FB eigenstates and occupy U unit cells. We obtain the complete two-parameter FB family of two-band d =1 networks with nearest unit cell interaction and U =2 . We discover a novel high symmetry sawtooth chain with identical hoppings in a transverse dc field, easily accessible in experiments. Our results pave the way towards a complete description of FBs in networks with more bands and in higher dimensions.

  20. Closure Report for Corrective Action Unit 465: Hydronuclear Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark Burmeister and Patrick Matthews

    2012-11-01

    The corrective action sites (CASs) within CAU 465 are located within Areas 6 and 27 of the NNSS. CAU 465 comprises the following CASs: • 00-23-01, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie site. • 00-23-02, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Dog site. • 00-23-03, Hydronuclear Experiment, located in Area 27 of the NNSS and known as the Charlie Prime and Anja sites. • 06-99-01, Hydronuclear, located in Area 6 of the NNSS and known as the Trailer 13 site. The purpose of this CRmore » is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 465 were met. From September 2011 through July 2012, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 465: Hydronuclear, Nevada National Security Site, Nevada.« less

  1. Business closure and relocation: a comparative analysis of the Loma Prieta earthquake and Hurricane Andrew.

    PubMed

    Wasileski, Gabriela; Rodríguez, Havidán; Diaz, Walter

    2011-01-01

    The occurrence of a number of large-scale disasters or catastrophes in recent years, including the Indian Ocean tsunami (2004), the Kashmir earthquake (2005), Hurricane Katrina (2005) and Hurricane Ike (2008), have raised our awareness regarding the devastating effects of disasters on human populations and the importance of developing mitigation and preparedness strategies to limit the consequences of such events. However, there is still a dearth of social science research focusing on the socio-economic impact of disasters on businesses in the United States. This paper contributes to this research literature by focusing on the impact of disasters on business closure and relocation through the use of multivariate logistic regression models, specifically focusing on the Loma Prieta earthquake (1989) and Hurricane Andrew (1992). Using a multivariate model, we examine how physical damage to the infrastructure, lifeline disruption and business characteristics, among others, impact business closure and relocation following major disasters. © 2011 The Author(s). Disasters © Overseas Development Institute, 2011.

  2. Comparative analysis of ear-hole closure identifies epimorphic regeneration as a discrete trait in mammals

    PubMed Central

    Gawriluk, Thomas R.; Simkin, Jennifer; Thompson, Katherine L.; Biswas, Shishir K.; Clare-Salzler, Zak; Kimani, John M.; Kiama, Stephen G.; Smith, Jeramiah J.; Ezenwa, Vanessa O.; Seifert, Ashley W.

    2016-01-01

    Why mammals have poor regenerative ability has remained a long-standing question in biology. In regenerating vertebrates, injury can induce a process known as epimorphic regeneration to replace damaged structures. Using a 4-mm ear punch assay across multiple mammalian species, here we show that several Acomys spp. (spiny mice) and Oryctolagus cuniculus completely regenerate tissue, whereas other rodents including MRL/MpJ ‘healer' mice heal similar injuries by scarring. We demonstrate ear-hole closure is independent of ear size, and closure rate can be modelled with a cubic function. Cellular and genetic analyses reveal that injury induces blastema formation in Acomys cahirinus. Despite cell cycle re-entry in Mus musculus and A. cahirinus, efficient cell cycle progression and proliferation only occurs in spiny mice. Together, our data unite blastema-mediated regeneration in spiny mice with regeneration in other vertebrates such as salamanders, newts and zebrafish, where all healthy adults regenerate in response to injury. PMID:27109826

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 375: Area 30 Buggy Unit Craters, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-08-01

    Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada National Security Site, Nevada with ROTC 1 and 2, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matthews, Patrick

    Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less

  5. Gallium-containing polymer brush film as efficient supported Lewis acid catalyst in a glass microreactor

    PubMed Central

    Munirathinam, Rajesh; Ricciardi, Roberto; Egberink, Richard J M; Huskens, Jurriaan; Holtkamp, Michael; Wormeester, Herbert; Karst, Uwe

    2013-01-01

    Summary Polystyrene sulfonate polymer brushes, grown on the interior of the microchannels in a microreactor, have been used for the anchoring of gallium as a Lewis acid catalyst. Initially, gallium-containing polymer brushes were grown on a flat silicon oxide surface and were characterized by FTIR, ellipsometry, and X-ray photoelectron spectroscopy (XPS). XPS revealed the presence of one gallium per 2–3 styrene sulfonate groups of the polymer brushes. The catalytic activity of the Lewis acid-functionalized brushes in a microreactor was demonstrated for the dehydration of oximes, using cinnamaldehyde oxime as a model substrate, and for the formation of oxazoles by ring closure of ortho-hydroxy oximes. The catalytic activity of the microreactor could be maintained by periodic reactivation by treatment with GaCl3. PMID:24062830

  6. Numerical and experimental investigation of turbine blade film cooling

    NASA Astrophysics Data System (ADS)

    Berkache, Amar; Dizene, Rabah

    2017-12-01

    The blades in a gas turbine engine are exposed to extreme temperature levels that exceed the melting temperature of the material. Therefore, efficient cooling is a requirement for high performance of the gas turbine engine. The present study investigates film cooling by means of 3D numerical simulations using a commercial code: Fluent. Three numerical models, namely k-ɛ, RSM and SST turbulence models; are applied and then prediction results are compared to experimental measurements conducted by PIV technique. The experimental model realized in the ENSEMA laboratory uses a flat plate with several rows of staggered holes. The performance of the injected flow into the mainstream is analyzed. The comparison shows that the RANS closure models improve the over-predictions of center-line film cooling velocities that is caused by the limitations of the RANS method due to its isotropy eddy diffusivity.

  7. Assessments of Fracture Toughness of Monolithic Ceramics-SEPB Versus SEVNB Methods

    NASA Technical Reports Server (NTRS)

    Choi, Sung R.; Gyekenyesi, John P.

    2006-01-01

    Fracture toughness of a total of 13 advanced monolithic ceramics including silicon nitrides, silicon carbide, aluminas, and glass ceramic was determined at ambient temperature by using both single edge precracked beam (SEPB) and single edge v-notched beam (SEVNB) methods. Relatively good agreement in fracture toughness between the two methods was observed for advanced ceramics with flat R-curves; whereas, poor agreement in fracture toughness was seen for materials with rising R-curves. The discrepancy in fracture toughness between the two methods was due to stable crack growth with crack closure forces acting in the wake region of cracks even in SEVNB test specimens. The effect of discrepancy in fracture toughness was analyzed in terms of microstructural feature (grain size and shape), toughening exponent in R-curve, and stable crack growth determined using back-face strain gaging.

  8. Does high diurnal variability in a reef flat from Ofu, American Samoa confer resistance to ocean acidification?

    NASA Astrophysics Data System (ADS)

    Koweek, D.; Samuel, L.; Mucciarone, D. A.; Woodson, C. B.; Monismith, S. G.; Dunbar, R. B.

    2012-12-01

    Forecasts for coral reefs under various ocean acidification scenarios are becoming increasingly complex due to significant inter-site variability in biogeochemistry, ecology, and physical oceanography. The reef flats of Ofu, American Samoa are a potential end-member of this vulnerability spectrum due to extremely high diurnal variability in their biogeochemistry. Here we present coupled biogeochemical and physical oceanographic measurements from a shallow reef flat on Ofu in November 2011. We observed diurnal temperature ranges of up to 7°C, along with diurnal pH and dissolved oxygen ranges of 0.6 units, and 160 percent of saturation, respectively. Carbon system measurements were less extreme. Alkalinity varied between 2240-2360 μmol/kg and total dissolved inorganic carbon (TDIC) ranged between 1850-2100 μmol/kg during the diurnal cycle. These observations suggest diurnal ranges of ~240ppm CO2 and 1.5 units of ΩAr. The larger diurnal range in TDIC relative to alkalinity suggests a reef environment dominated by photosynthesis. From these observations, we explore the balance between the dominant biogeochemical processes of production and calcification on the reef flat in more detail, along with its implication for conferring resistance to ocean acidification. We use calcification rate estimates to provide insight to patterns of day and night growth and/or dissolution on the reef. Finally, we present evidence of tidal modulation of the biogeochemical signals and discuss the role of localized physical circulation in helping to determine a reef's vulnerability to ocean acidification.

  9. Out-of-hospital births and the supply of maternity units in France.

    PubMed

    Blondel, Béatrice; Drewniak, Nicolas; Pilkington, Hugo; Zeitlin, Jennifer

    2011-09-01

    Maternity unit closures in France have increased distances that women travel to deliver in hospital. We studied how the supply of maternity units influences the rate of out-of-hospital births using birth certificate data. In 2005-6, 4.3 per 1000 births were out-of-hospital. Rates were more than double for women living 30km or more from their nearest unit and were even higher for women of high parity. These associations persisted in multilevel analyses adjusting for other maternal characteristics. Long distances to maternity units should be a concern to health planners because of the maternal and infant health risks. Copyright © 2011 Elsevier Ltd. All rights reserved.

  10. Data system for multiplexed water-current meters

    NASA Technical Reports Server (NTRS)

    Ramsey, C. R.

    1977-01-01

    Flow rates at 32 flood plain locations are measured simultaneously by single digital logic unit with high noise immunity. Water flowing through pygmy current meters rotates element that closes electrical contact once every resolution, so flow rate is measured by counting number of closures in time interval.

  11. Magnetotelluric Data, Mid Valley, Nevada Test Site, Nevada.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jackie M. Williams; Erin L. Wallin; Brian D. Rodriguez

    2007-08-15

    The United States Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) at their Nevada Site Office (NSO) are addressing ground-water contamination resulting from historical underground nuclear testing through the Environmental Management (EM) program and, in particular, the Underground Test Area (UGTA) project. One issue of concern is the nature of the somewhat poorly constrained pre-Tertiary geology and its effects on ground-water flow. Ground-water modelers would like to know more about the hydrostratigraphy and geologic structure to support a hydrostratigraphic framework model that is under development for the Rainier Mesa/Shoshone Mountain Corrective Action Unit (CAU) (Bechtel Nevada, 2006).more » During 2003, the U.S. Geological Survey (USGS), in cooperation with the DOE and NNSA-NSO, collected and processed data at the Nevada Test Site in and near Yucca Flat (YF) to help define the character, thickness, and lateral extent of the pre-tertiary confining units. We collected 51 magnetotelluric (MT) and audio-magnetotelluric (AMT), stations for that research (Williams and others, 2005a, 2005b, 2005c, 2005d, 2005e, 2005f). In early 2005 we extended that research with 26 additional MT data stations (Williams and others, 2006), located on and near Rainier Mesa and Shoshone Mountain (RM-SM). The new stations extended the area of the hydrogeologic study previously conducted in Yucca Flat. This work was done to help refine what is known about the character, thickness, and lateral extent of pre-Tertiary confining units. In particular, a major goal was to define the upper clastic confining unit (UCCU). The UCCU is comprised of late Devonian to Mississippian siliciclastic rocks assigned to the Eleana Formation and Chainman Shale. The UCCU underlies the Yucca Flat area and extends westward towards Shoshone Mountain, southward to Buckboard Mesa, and northward to Rainier Mesa. Late in 2005 we collected another 14 MT stations in Mid Valley and in northern Yucca Flat basin. That work was done to better determine the extent and thickness of the UCCU near the southeastern RM-SM CAU boundary with the southwestern YF CAU, and also in the northern YF CAU. The purpose of this report is to release the MT data at those 14 stations shown in figure 1. No interpretation of the data is included here.« less

  12. Geology of the Brick Flat massive sulfide body, Iron Mountain cluster, West Shasta district, California ( USA).

    USGS Publications Warehouse

    Albers, J.P.

    1985-01-01

    The Brick Flat massive sulfide body is one of a group of 8 individual bodies that constitute the Iron Mountain cluster in the S part of the West Shasta district. Before they were separated by postmineral faulting, 5 of the 8 sulfide bodies formed a single large deposit about 1375 m long with a mass of some 23 million metric tons. The pyritic Brick Flat sulfide body is one of the 5 faulted segements of this deposit. The Brick Flat massive sulfide lies within medium phenocryst rhyolite that is characteristic of the ore-bearing middle unit of the Balaklala Rhyolite. It is interpreted to be downfaulted a vertical distance of 75 to 85 m from the Old Mine sulfide-gossan orebody along the N-dipping Camden South fault. It is bounded in turn on its N side by another parallel fault, the Camden North, which drops the orebody down another 75 m to the level of the Richmond orebody. -from Author

  13. Flat-walled multilayered anechoic linings: Optimization and application

    NASA Astrophysics Data System (ADS)

    Xu, Jingfeng; Buchholz, Jörg M.; Fricke, Fergus R.

    2005-11-01

    The concept of flat-walled multilayered absorbent linings for anechoic rooms was proposed three decades ago. Flat-walled linings have the advantage of being less complicated and, hence, less costly to manufacture and install than the individual units such as wedges. However, there are difficulties in optimizing the design of such absorbent linings. In the present work, the design of a flat-walled multilayered anechoic lining that targeted a 250 Hz cut-off frequency and a 300 mm maximum lining thickness was first optimized using an evolutionary algorithm. Sixteen of the most commonly used commercial fibrous building insulation materials available in Australia were investigated and fourteen design options (i.e., material combinations) were found by the evolutionary algorithm. These options were then evaluated in accordance with their costs and measured acoustic absorption performances. Finally, the completed anechoic room, where the optimized design was applied, was qualified and the results showed that a large percentage (75%-85%) of the distance between the sound source and the room boundaries, on the traverses made, were anechoic.

  14. Monitoring Potential Transport of Radioactive Contaminants in Shallow Ephemeral Channels: FY2015 and FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mizell, Steve A; Miller, Julianne J; McCurdy, Greg

    The Desert Research Institute (DRI) is conducting a field assessment of the potential for contaminated soil to be transported from the Smoky Contamination Area (CA) as a result of storm runoff. This activity supports Nevada Nuclear Security Administration (NNSA) efforts to complete regulatory closure of the Soils Corrective Action Unit (CAU) contamination areas. The work is intended to confirm the likely mechanism of transport and determine the meteorological conditions that might cause movement of contaminated soils, as well as determine the particle size fraction that is most closely associated with transported radionuclide-contaminated soils. These data will facilitate the appropriate closuremore » design and post-closure monitoring program.« less

  15. 76 FR 81525 - Notice of Proposed Withdrawal Extension and Notification of a Public Meeting; Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ....56 acres of public land from settlement, sale, location, or entry under the general land laws, including the United States mining laws, to protect the Bonneville Salt Flats (BSF). This notice also... laws, including the United States mining laws, but not from leasing under the mineral leasing laws, to...

  16. General Shop Competencies in Vocational Agriculture for 9th and 10th Grade Classes.

    ERIC Educational Resources Information Center

    Novotny, Ronald; And Others

    The document presents unit plans which offer list of experiences and competencies to be learned for general shop occupations in vocational agriculture. The units include: (1) arc welding, (2) oxy-acetylene welding, (3) flat concrete, (4) concrete block, (5) lumber patterns and wood building materials, (6) metal fasteners, (7) wood adhesives, (8)…

  17. Unsteady heat-flux measurements of second-mode instability waves in a hypersonic flat-plate boundary layer

    NASA Astrophysics Data System (ADS)

    Kegerise, Michael A.; Rufer, Shann J.

    2016-08-01

    In this paper, we report on the application of the atomic layer thermopile (ALTP) heat-flux sensor to the measurement of laminar-to-turbulent transition in a hypersonic flat-plate boundary layer. The centerline of the flat-plate model was instrumented with a streamwise array of ALTP sensors, and the flat-plate model was exposed to a Mach 6 freestream over a range of unit Reynolds numbers. Here, we observed an unstable band of frequencies that are associated with second-mode instability waves in the laminar boundary layer that forms on the flat-plate surface. The measured frequencies, group velocities, phase speeds, and wavelengths of these instability waves are consistent with data previously reported in the literature. Heat flux time series, and the Morlet wavelet transforms of them, revealed the wave-packet nature of the second-mode instability waves. In addition, a laser-based radiative heating system was used to measure the frequency response functions (FRF) of the ALTP sensors used in the wind tunnel test. These measurements were used to assess the stability of the sensor FRFs over time and to correct spectral estimates for any attenuation caused by the finite sensor bandwidth.

  18. Some possibilities of a closure degree increase and matter turnover intensification in the bioregenerative life support system BIOS-3

    NASA Astrophysics Data System (ADS)

    Tikhomirov, A. A.; Ushakova, S. A.; Velichko, V. V.; Degermendzhy, Á. G.; Lasseur, Ch.; Lamaze, B.

    The problems of scientific-technical substantiation of perspective joint IBP-ESA works on imitation of functioning of stationary bioregenerative life support systems BLSS on Moon and or Mars are discussed With this purpose the possibilities of matter turnover intensification and closure degree increase which can be achieved after modernization of the BIOS-3 BLSS designed and constructed at Institute of Biophysics Siberian Branch of Russian Academy of Sciences IBP SB RAS Russia are considered These works are performed in the frame of INTAS IA project under the joint SB RAS-ESA financial support Specifically at the expense of intensity increase of photosynthetic active radiation from 150 to 250 Wt m 2 the productivity of photosynthesizing unit on oxygen and biomass is supposed to increase on 50 on average The given substantiation is based upon analysis of carried out preliminary experiments in a laboratory environment and in the BIOS-3 facility and also on series of experiments carried out at present time The results of technical reconstruction of lighting and thermoregulation systems demonstrating practical possibility of these plans implementation are produced On the grounds of mass exchange processes intensification the problems of a crew supply with vegetarian food and oxygen under a smaller photosynthesizing unit size are considered Some possibilities of the humans wastes utilization under combination of physicochemical and biological methods and necessary technical decisions allowing closure increase of matter turnover are

  19. Supporting Displaced Workers for Successful Retraining.

    ERIC Educational Resources Information Center

    Bugler, Helen; Newhook, Brenda

    In response to the closure and down-sizing of fish plants in Newfoundland, Cabot College (CC) established a Student Support Services Unit (SSSU) to offer special counseling and advising services to the more than 100 students expected to undertake vocational retraining at CC under the province's Fisheries Adjustment Program. The SSSU hired two…

  20. 40 CFR 267.111 - What general standards must I meet when I stop operating the unit?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE...

  1. 40 CFR 267.111 - What general standards must I meet when I stop operating the unit?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... to protect human health and the environment, post-closure escape of hazardous waste, hazardous constituents, leachate, contaminated run-off, or hazardous waste decomposition products to the ground or... PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE...

  2. WHAT ARE THE BEST MEANS TO ASSESS SITES AND MOVE TOWARD CLOSURE, USING APPROPRIATE SITE SPECIFIC RISK EVALUATIONS?

    EPA Science Inventory

    To facilitate evaluation of existing site characterization data, ORD has developed on-line tools and models that integrate data and models into innovative applications. Forty calculators have been developed in four groups: parameter estimators, models, scientific demos and unit ...

  3. The Income Losses of Displaced Workers

    ERIC Educational Resources Information Center

    Hijzen, Alexander; Upward, Richard; Wright, Peter W.

    2010-01-01

    We use a new, matched worker-firm dataset for the United Kingdom to estimate the income loss resulting from firm closure and mass layoffs. We track workers for up to nine years after the displacement event, and the availability of predisplacement characteristics allows us to implement difference-in-differences estimators using propensity score…

  4. MEETING IN MEXICO: NOWCASTING AND FORECASTING BEACH BACTERIA CONCENTRATION USING EPA'S VIRTUAL BEACH SOFTWARE

    EPA Science Inventory

    Beaches in the United States of (North) America are subject to closure when bacterial counts exceed water quality criteria. Many authorities base these decisions on water samples that typically require at least 18 hours to analyze. This persistence approach, or model, often leads...

  5. 76 FR 66260 - Fisheries of the Northeastern United States; Atlantic Mackerel, Squid, and Butterfish Fisheries...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... number of management measures, such as closure thresholds, gear restrictions, and possession limits. The... recommended zero JVP because U.S. shoreside processing capacity for mackerel has expanded. The Council... personal identifying information (e.g., name, address, etc.) submitted voluntarily by the sender will be...

  6. Joining Forces: The Case of Alliant International University

    ERIC Educational Resources Information Center

    Leslie, Heather

    2013-01-01

    Mergers and acquisitions are a prevalent force in higher education as more colleges and universities are joining forces to expand resources, enhance missions, or prevent closures. This study examines the merger of Alliant University (formerly California School of Professional Psychology) with United States International University to create what…

  7. 50 CFR 648.55 - Framework adjustments to management measures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... criteria. Rotational Closures should be considered where projected annual change in scallop biomass is... annual change in scallop biomass is less than 15 percent. (b) The preparation of the SAFE Report shall... calculate the stock biomass and fishing mortality for the entire unit stock and consider all sources of...

  8. 21 CFR 212.50 - What production and process controls must I have?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... containers, closures, and packaging materials, including a specimen or copy of each label and all other..., the name and radioactivity or other measurement of each active pharmaceutical ingredient and each... active pharmaceutical ingredient and each inactive ingredient per batch or per unit of radioactivity or...

  9. 21 CFR 212.50 - What production and process controls must I have?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... containers, closures, and packaging materials, including a specimen or copy of each label and all other... radioactivity or other measurement of each active pharmaceutical ingredient and each inactive ingredient per... active pharmaceutical ingredient and each inactive ingredient per batch or per unit of radioactivity or...

  10. Optical lenses design and experimental investigations of a dynamic focusing unit for a CO2 laser scanning system

    NASA Astrophysics Data System (ADS)

    Chen, Wei; Xu, Yue; Zhang, Huaxin; Liu, Peng; Jiao, Guohua

    2016-09-01

    Laser scanners are critical components in material processing systems, such as welding, cutting, and drilling. To achieve high-accuracy processing, the laser spot size should be small and uniform in the entire objective flat field. However, traditional static focusing method using F-theta objective lens is limited by the narrow flat field. To overcome these limitations, a dynamic focusing unit consisting of two lenses is presented in this paper. The dual-lens system has a movable plano-concave lens and a fixed convex lens. As the location of the movable optical elements is changed, the focal length is shifted to keep a small focus spot in a broad flat processing filed. The optical parameters of the two elements are theoretical analyzed. The spot size is calculated to obtain the relationship between the moving length of first lens and the shift focus length of the system. Also, the Zemax model of the optical system is built up to verify the theoretical design and optimize the optical parameter. The proposed lenses are manufactured and a test system is built up to investigate their performances. The experimental results show the spot size is smaller than 450um in all the 500*500mm 2 filed with CO2 laser. Compared with the other dynamic focusing units, this design has fewer lenses and no focusing spot in the optical path. In addition, the focal length minimal changes with the shit of incident laser beam.

  11. Malthusian overfishing and efforts to overcome it on Kenyan coral reefs.

    PubMed

    McClanahan, Tim R; Hicks, Christina C; Darling, Emily S

    2008-09-01

    This study examined trends along a gradient of fishing intensity in an artisanal coral reef fishery over a 10-year period along 75 km of Kenya's most populated coastline. As predicted by Malthusian scenarios, catch per unit effort (CPUE), mean trophic level, the functional diversity of fished taxa, and the diversity of gear declined, while total annual catch and catch variability increased along the fishing pressure gradient. The fishery was able to sustain high (approximately 16 Mg x km(-2) x yr(-1)) but variable yields at high fishing pressure due to the dominance of a few productive herbivorous fish species in the catch. The effect of two separate management strategies to overcome this Malthusian pattern was investigated: fisheries area closure and elimination of the dominant and most "competitive" gear. We found that sites within 5 km of the enforced closure showed significantly lower total catch and CPUE, but increased yield stability and trophic level of catch than predicted by regression models normalized for fishing effort. Sites that had excluded illegal beach seine use through active gear management exhibited increased total catch and CPUE. There was a strong interaction between closure and gear management, which indicates that, for closures to be effective at increasing catch, there must be simultaneous efforts at gear management around the periphery of the closures. We propose that Malthusian effects are responsible for the variation in gear and catch and that active management through reduced effort and reductions in the most competitive gear have the greatest potential to increase the functional and trophic diversity and per-person productivity.

  12. Spontaneous Closure of Patent Ductus Arteriosus in Infants ≤1500 g.

    PubMed

    Semberova, Jana; Sirc, Jan; Miletin, Jan; Kucera, Jachym; Berka, Ivan; Sebkova, Sylva; O'Sullivan, Sinead; Franklin, Orla; Stranak, Zbynek

    2017-08-01

    Patent ductus arteriosus (PDA) remains a challenging issue in very low birth weight (VLBW) infants, and its management varies widely. Our aim in this study was to document the natural course of ductus arteriosus in a cohort of VLBW infants who underwent conservative PDA management with no medical or surgical intervention. A retrospective cohort study conducted in 2 European level-3 neonatal units. A total of 368 VLBW infants were born within the study period. Two hundred and ninety-seven infants were free of congenital malformations or heart defects and survived to hospital discharge. Out of those, 280 infants received truly conservative PDA management. In 237 (85%) of nontreated infants, the PDA closed before hospital discharge. The Kaplan-Meier model was used to document the incidence proportion of PDA closure over time for different gestational age groups. The median time to ductal closure was 71, 13, 8, and 6 days in <26+0, 26+0 to 27+6, 28+0 to 29+6, and ≥30 weeks, respectively. For different birth weight groups, the median was 48, 22, 9, and 8 days in infants weighing <750, 750 to 999, 1000 to 1249, and 1250 to 1500 g, respectively. No statistically significant relationship was found between PDA closure before hospital discharge and neonatal morbidities. The likelihood of PDA spontaneous closure in VLBW infants is extremely high. We provide in our findings a platform for future placebo-controlled trials focused on the smallest and youngest infants. Copyright © 2017 by the American Academy of Pediatrics.

  13. Results of the combined U.S. Multicenter Pivotal Study and the Continuing Access Study of the Nit-Occlud PDA device for percutaneous closure of patent ductus arteriosus.

    PubMed

    Moore, John W; Greene, Jessica; Palomares, Salvadore; Javois, Alexander; Owada, Carl Y; Cheatham, John P; Hoyer, Mark H; Jones, Thomas K; Levi, Daniel S

    2014-12-01

    This study aimed to compare the efficacy and safety of the Nit-Occlud PDA device (PFM Medical, Cologne, Germany) to benchmarks designed as objective performance criteria (OPC). The Nit-Occlud PDA is a nitinol coil-type patent ductus arteriosus (PDA) occluder with a reverse cone configuration, which is implanted using a controlled delivery system. Patients with <4-mm minimum diameter PDA were prospectively enrolled in the Pivotal and the Continuing Access Studies from 15 sites in the United States and were followed up for 12 months post-procedure. Investigator-reported outcomes were compared to OPC including a composite success criterion, efficacy criteria of successful closure (clinical and echocardiographic), and safety criteria incidence of adverse events (serious and of total). The Pivotal Study enrolled patients between November 1, 2002 and October 31, 2005, and the Continuing Access Study enrolled additional patients between September 1, 2006 and October 31, 2007. A total of 357 patients were enrolled, and 347 had successful device implantations. After 12 months, 96.8% had complete echocardiographic closure (OPC = 85%) and 98.1% had clinical closure (OPC = 95%). There were no deaths or serious adverse events (OPC = 1%). The total adverse event rate was 4.7% (OPC = 6%). Composite success was 95.1% in the study patients (OPC = 80%). Closure of small- and medium-sized PDA with the Nit-Occlud PDA is effective and safe when compared with OPC. Copyright © 2014 American College of Cardiology Foundation. Published by Elsevier Inc. All rights reserved.

  14. Flat epithelial atypia of the breast.

    PubMed

    Nasser, Selim M

    2009-01-01

    "Flat epithelial atypia" is the adopted term by the WHO working group on breast tumor referring to an early neoplastic breast lesion affecting the terminal duct-lobular units. Pathologists have described this lesion under a variety of names including columnar cell lesions and low-grade clinging carcinoma in situ. It is usually encountered on breast biopsies performed for mammographically-identified microcalcifications. Because of its relatively frequent association with carcinomas, its recognition in biopsy specimens is important. This review will focus on the histopathologic features, differential diagnosis, biologic potential, clinical significance and management of this lesion.

  15. Water table in rocks of Cenozoic and Paleozoic age, 1980, Yucca Flat, Nevada Test Site, Nevada

    USGS Publications Warehouse

    Doty, G.C.; Thordarson, William

    1983-01-01

    The water table at Yucca Flat, Nevada Test Site, Nevada, occurs in rocks of Paleozoic age and in tuffs and alluvium of Cenozoic age and ranges in altitude from about 2,425 feet to about 3,500 feet. The configuration of the water table is depicted by contours with intervals of 25 to 500 feet. Control for the map consists of water-level information from 61 drill holes, whose locations and age of geologic units penetrated are shown by symbols on the map. (USGS)

  16. Corrective Action Decision Document for Corrective Action Unit 428: Area 3 Septic Waste Systems 1 and 5, Tonopah Test Range, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    U.S. Department of Energy, Nevada Operations Office

    2000-02-08

    This Corrective Action Decision Document identifies and rationalizes the US Department of Energy, Nevada Operations Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 428, Septic Waste Systems 1 and 5, under the Federal Facility Agreement and Consent Order. Located in Area 3 at the Tonopah Test Range (TTR) in Nevada, CAU 428 is comprised of two Corrective Action Sites (CASs): (1) CAS 03-05-002-SW01, Septic Waste System 1 and (2) CAS 03-05-002- SW05, Septic Waste System 5. A corrective action investigation performed in 1999 detected analyte concentrations that exceeded preliminarymore » action levels; specifically, contaminants of concern (COCs) included benzo(a) pyrene in a septic tank integrity sample associated with Septic Tank 33-1A of Septic Waste System 1, and arsenic in a soil sample associated with Septic Waste System 5. During this investigation, three Corrective Action Objectives (CAOs) were identified to prevent or mitigate exposure to contents of the septic tanks and distribution box, to subsurface soil containing COCs, and the spread of COCs beyond the CAU. Based on these CAOs, a review of existing data, future use, and current operations in Area 3 of the TTR, three CAAs were developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Closure in Place with Administrative Controls; and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of the evaluation, the preferred CAA was Alternative 3. This alternative meets all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated soils at the Area 3 Septic Waste Systems 1 and 5.« less

  17. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

  18. Extensive investigation of the generalized dark matter model

    NASA Astrophysics Data System (ADS)

    Kopp, Michael; Skordis, Constantinos; Thomas, Dan B.

    2016-08-01

    The cold dark matter (CDM) model, wherein the dark matter is treated as a pressureless perfect fluid, provides a good fit to galactic and cosmological data. With the advent of precision cosmology, it should be asked whether this simplest model needs to be extended, and whether doing so could improve our understanding of the properties of dark matter. One established parametrization for generalizing the CDM fluid is the generalized dark matter (GDM) model, in which dark matter is an imperfect fluid with pressure and shear viscosity that fulfill certain postulated closure equations. We investigate these closure equations and the three new parametric functions they contain: the background equation of state w , the speed of sound cs2 and the viscosity cvis2. Taking these functions to be constant parameters, we analyze an exact solution of the perturbed Einstein equations in a flat GDM-dominated universe and discuss the main effects of the three parameters on the cosmic microwave background (CMB). Our analysis suggests that the CMB alone is not able to distinguish between the GDM sound speed and viscosity parameters, but that other observables, such as the matter power spectrum, are required to break this degeneracy. In order to elucidate further the meaning of the GDM closure equations, we also consider other descriptions of imperfect fluids that have a nonperturbative definition and relate these to the GDM model. In particular, we consider scalar fields, an effective field theory (EFT) of fluids, an EFT of large-scale structure, nonequilibrium thermodynamics and tightly coupled fluids. These descriptions could be used to extend the GDM model into the nonlinear regime of structure formation, which is necessary if the wealth of data available on those scales is to be employed in constraining the model. We also derive the initial conditions for adiabatic and isocurvature perturbations in the presence of GDM and standard cosmological fluids and provide the result in a form ready for implementation in Einstein-Boltzmann solvers.

  19. Associate Directorate Environmental Management Infrastructure Plan for Area G and Area L Domes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevens, Patrice Ann; Baumer, Andrew Ronald

    Technical Area 54, at Los Alamos National Laboratory (LANL) is situated in the east-central portion of the Laboratory on the Mesita del Buey between Pajarito Canyon to the south and Cañada del Buey to the north. TA-54 includes four MDAs designated as G, H, J, and L; a waste characterization, container storage, and transfer facility; active TRU waste and MLLW waste storage and low-level waste (LLW) disposal operations at Area G; active hazardous and mixed low-level (MLLW) waste storage operations at Area L; and administrative and support areas. MDA J has previously under-gone closure. Area G is a waste managementmore » and disposal area, used for the disposal and storage of radioactive wastes since 1957. Since August 2015, Area G has been in warm standby and provides minimal operations to support safety, compliance, and nitrate salt remediation. Located within Area G, MDA G covers 63-acres. MDA G contains 334 active and inactive waste management units, which include 36 pits, 294 shafts, and 4 trenches. In 1971, Area G began use for the retrievable storage of TRU waste. There are two pits, four trenches and 60 shafts that contain retrievable TRU waste. Thirty-three of the shafts contain TRU waste that may present unique problems for retrieval. In 1986, segregation of MLLW was initiated at Area G for treatment and temporary storage or for off-site disposal. Area G is the only active LLW disposal facility at the Laboratory. Current operations at Area G include storage and characterization of TRU and mixed TRU waste destined for off-site disposal at the Waste Isolation Pilot Plant (WIPP) in southeastern New Mexico and the storage of MLLW destined for off-site treatment and/or disposal. Several above-ground container storage units (CSUs) are currently used for storage of containerized MLLW and/or mixed TRU wastes. These consist of asphalt pads and associated fabric domes or other structures. As defined by the Consent Order, MDA G contains 229 of the 334 subsurface waste management units at Area G. These MDA G disposal units include 32 pits, 193 shafts, and 4 trenches and contain LLW, MLLW and TRU waste. The remaining 105 solid waste management units (SWMUs) include RCRA-regulated landfill and storage units and DOE-regulated LLW disposal units. The TA-54 closure project must ensure that continuing waste operations at Area G and their transition to an interim or enduring facility are coordinated with closure activities.« less

  20. 40 CFR 81.329 - Nevada.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... on the State of Nevada Division of Water Resources' map titled Water Resources and Inter-basin Flows...-26E) X Clovers Area (64)(32-39N, 42-46E) X 1 EPA designation replaces State designation. 2 Rest of... Boulder Flat (61) (31-37N, 45-51E): Upper Unit 61 X Lower Unit 61 X Rest of State 1 X 1 Rest of State...

  1. Role of Groundwater Monitoring for Closure of Underground Nuclear Tests on the Nevada Test Site

    NASA Astrophysics Data System (ADS)

    Chapman, J. B.; Pohlmann, K.; Pohll, G.; Russell, C.

    2009-12-01

    Over 800 underground nuclear tests were conducted at the Nevada Test Site in a variety of hydrogeologic environments. As of the 1996 Environmental Impact Statement for the site, more than 100 million curies of radioactivity remained in the subsurface from these tests, much of it near or below the water table. The U.S. Department of Energy Environmental Management program is implementing a closure strategy for these sites that anticipates closure-in-place, natural attenuation, and institutional controls. Groundwater monitoring is a key component of this strategy, but its role is significantly evolved from that of a detection- or compliance-based monitoring concept. Indeed, monitoring is part of the integrated closure process itself, not an activity confined to a static post-closure period. The reasons for this evolution derive from the complex hydrogeologic conditions, the long time-frames of concern, and recognition that a significant degree of uncertainty is irreducible. The hundreds of test locations are grouped into Corrective Action Units that measure over 100 km2 in area and extend to depths in excess of 1000 m. Despite concerted data collection efforts, the technical basis for closure of these large regions relies heavily on complex numerical models of flow and transport. The inherent uncertainties in these models present challenges for reaching regulatory acceptance of closure, and challenges for confidently locating monitoring wells. The solution now being pursued for the NTS is to integrate model evaluation and monitoring. In addition to standard goals of contaminant detection and protection of human health, an explicit monitoring objective is to increase confidence in model results by assessing the reliability of model forecasts. The initial monitoring network is expected to eventually transition to a long-term closure design, with less emphasis on confidence-building as uncertainty in forecasts is reduced. The methodology for this iterative process of monitoring and model refinement will incorporate expert-judgment and Bayesian updating of model input parameters to provide a cost-beneficial monitoring network that is expected to reduce model prediction uncertainty. This approach to monitoring for these large and complex contaminant areas is consistent with the underlying reliance on model predictions and will ensure that water quality samples are collected in a manner and location that is consistent with the current understanding of contaminant flowpaths.

  2. Transcatheter closure of large patent ductus arteriosus with severe pulmonary arterial hypertension in adults: immediate and two-year follow-up results.

    PubMed

    Zhang, Cao-Jin; Huang, Yi-Gao; Huang, Xin-Sheng; Huang, Tao; Huang, Wen-Hui; Xia, Chun-Li; Mo, Yu-Jing

    2012-11-01

    Transcatheter closure of patent ductus arteriosus (PDA) is a well established procedure and an accepted treatment modality for small to moderate-sized PDA. This study aimed to evaluate the immediate and follow-up results of transcatheter closure of large PDAs with severe pulmonary arterial hypertension (PAH) in adults. After a complete hemodynamic evaluation differentiating from the reversibility of severe PAH, transcatheter closure of PDA was performed. Patients were followed up clinically and echocardiographically at 24 hours, 1 month, 3 months, 6 months, 12 months and 24 months after occlusion. Twenty-nine patients had successful occlusion, pulmonary artery pressure (PAP), left ventricular ejection fraction (LVEF) and fractional shortening (FS) significantly decreased immediately after occlusion ((106 ± 25) mmHg vs. (50 ± 14) mmHg, P < 0.01; (63.7 ± 7.2)% vs. (51.4 ± 10.1)%, P < 0.01 and (36.9 ± 8.2)% vs. (28.9 ± 8.6)%, P < 0.05, respectively). At 1 month after PDA closure, the signs and symptoms improved markedly in all 29 patients, and PDAs were completely closed and remained closed during the follow-up. Eighteen patients having different degrees of dyspnea were treated with angiotensin converting enzyme inhibitor (ACEI) and/or digoxin after occlusion. Nine patients whose pulmonary vascular resistence (PVR) > 6 Wood units accepted targeted PAH therapy. After 1 to 3 months of peroral drug therapy, their exercise tolerance improved from New York Heart Association (NYHA) class III-IV to NYHA class I. During follow-up, no latent arrhythmias were found, the left atrial diameter (LAD), left ventricular end-diastolic diameter (LVEDD), left ventricular end-systolic diameter (LVESD), left ventricular mass index (LVMI) and pulmonary artery systolic pressure (PASP) decreased significantly (P < 0.05), and FS and LVEF recovered compared to the immediate postclosure state. However, FS and LVEF remained low compared to the preclosure state. Transcatheter closure of large PDA with severe PAH is feasible, effective, and safe in adults. Significant left ventricular systolic changes may occur after closure of large PDA, and left ventricular function usually recovers within a few months.

  3. Interim Closure Activities at Corrective Action Unit 114: Area 25 EMAD Facility, Nevada National Security Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boehlecke, R. F.

    This letter report documents interim activities that have been completed at CAU 114 to support ongoing access and generate information necessary to plan future closure activities. General housekeeping and cleanup of debris was conducted in the EMAD yard, cold bays, support areas of Building 3900, and postmortem cell tunnel area of the hot bay. All non-asbestos ceiling tiles and loose and broken non-friable asbestos floor tiles were removed from support galleries and office areas. Non-radiologically contaminated piping and equipment in the cold areas of the building and in the two 120-ton locomotives in the yard were tapped, characterized, drained, andmore » verified free of contents.« less

  4. Post-Closure Inspection Report for the Tonopah Test Range, Nevada, For Calendar Year 2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This report provides the results of the annual post-closure inspections conducted at the closed Corrective Action Units (CAUs) located on the Tonopah Test Range (TTR), Nevada. This report covers calendar year 2011 and includes inspection and repair activities completed at the following CAUs: (1) CAU 400: Bomblet Pit and Five Points Landfill (TTR); (2) CAU 407: Roller Coaster RadSafe Area (TTR); (3) CAU 424: Area 3 Landfill Complexes (TTR); (4) CAU 453: Area 9 UXO Landfill (TTR); and (5) CAU 487: Thunderwell Site (TTR) Inspections were conducted according to the post-closure plans in the approved Closure Reports. The post-closure inspectionmore » plan for each CAU is included in Appendix B. The inspection checklists are included in Appendix C, field notes are included in Appendix D, and photographs taken during inspections are included in Appendix E. The annual post-closure inspections were conducted May 3 and 4, 2011. Maintenance was performed at CAU 424, CAU 453, and CAU 487. At CAU 424, two surface grade monuments at Landfill Cell A3-3 could not be located during the inspection. The two monuments were located and marked with lava rock on July 13, 2011. At CAU 453, there was evidence of animal burrowing. Animal burrows were backfilled on July 13, 2011. At CAU 487, one use restriction warning sign was missing, and wording was faded on the remaining signs. A large animal burrow was also present. The signs were replaced, and the animal burrow was backfilled on July 12, 2011. As a best management practice, the use restriction warning signs at CAU 407 were replaced with standard Federal Facility Agreement and Consent Order signs on July 13, 2011. Vegetation monitoring was performed at the CAU 400 Five Points Landfill and CAU 407 in June 2011, and the vegetation monitoring report is included in Appendix F.« less

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 365: Baneberry Contamination Area, Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2011-09-01

    Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less

  6. Treatment Strategies in 135 Consecutive Patients with Enterocutaneous Fistulas

    PubMed Central

    Visschers, Ruben G. J.; Damink, Steven W. M. Olde; Winkens, Bjorn; Soeters, Peter B.

    2008-01-01

    Background Enterocutaneous fistulas (ECF) pose a major challenge to every gastrointestinal (GI) surgeon. Based on earlier studies, a standardized treatment guideline was implemented. The focus of the present study was to assess that guideline and determine prognostic factors for outcome of patients with ECF, and to define a more detailed therapeutic approach including the convalescence time before restorative surgery. Methods All patients with ECF treated between 1990 and 2005 were included. Management consisted of controlling Sepsis, Optimization of nutritional state, Wound care, assessment of fistula Anatomy, Timing of surgery, and Surgical strategy (the SOWATS guideline). Prognostic factors were assessed by way of multiple logistic regression analysis. Results A total of 135 patients were treated at our unit. Overall closure was achieved in 118 patients (87.4%). Restorative operations for fistula closure were performed after a median of 53 days (range: 4–270 days). Restorative operations were successful in 97/107 patients (90.7%). Thirteen patients (9.6%) died. An abdominal wall defect was the most predominant negative prognostic factor for spontaneous closure (odds ratio [OR] = 0.195, confidence interval [CI] 0.052–0.726, p = 0.015). A strong relation was found between preoperative albumin level and surgical closure (p < 0.001) and mortality (p < 0.001). Conclusions Application of the SOWATS guideline allowed a favorable outcome after a short convalescence period. Abdominal wall defects and preoperative hypoalbuminemia are important prognostic variables. PMID:18175171

  7. Treatment strategies in 135 consecutive patients with enterocutaneous fistulas.

    PubMed

    Visschers, Ruben G J; Olde Damink, Steven W M; Winkens, Bjorn; Soeters, Peter B; van Gemert, Wim G

    2008-03-01

    Enterocutaneous fistulas (ECF) pose a major challenge to every gastrointestinal (GI) surgeon. Based on earlier studies, a standardized treatment guideline was implemented. The focus of the present study was to assess that guideline and determine prognostic factors for outcome of patients with ECF, and to define a more detailed therapeutic approach including the convalescence time before restorative surgery. All patients with ECF treated between 1990 and 2005 were included. Management consisted of controlling Sepsis, Optimization of nutritional state, Wound care, assessment of fistula Anatomy, Timing of surgery, and Surgical strategy (the SOWATS guideline). Prognostic factors were assessed by way of multiple logistic regression analysis. A total of 135 patients were treated at our unit. Overall closure was achieved in 118 patients (87.4%). Restorative operations for fistula closure were performed after a median of 53 days (range: 4-270 days). Restorative operations were successful in 97/107 patients (90.7%). Thirteen patients (9.6%) died. An abdominal wall defect was the most predominant negative prognostic factor for spontaneous closure (odds ratio [OR]=0.195, confidence interval [CI] 0.052-0.726, p=0.015). A strong relation was found between preoperative albumin level and surgical closure (p<0.001) and mortality (p<0.001). Application of the SOWATS guideline allowed a favorable outcome after a short convalescence period. Abdominal wall defects and preoperative hypoalbuminemia are important prognostic variables.

  8. An evaluation of the pressure proof test concept for 2024-T3 aluminium alloy sheet

    NASA Technical Reports Server (NTRS)

    Dawicke, D. S.; Poe, C. C., Jr.; Newman, J. C.; Harris, C. E.

    1991-01-01

    The concept of pressure proof testing of fuselage structures with fatigue cracks to insure structural integrity was evaluated from a fracture mechanics viewpoint. A generic analytical and experimental investigation was conducted on uniaxially loaded flat panels with crack configurations and stress levels typical of longitudinal lap splice joints in commercial transport aircraft fuselages. The results revealed that the remaining fatigue life after a proof cycle was longer than that without the proof cycle because of crack growth retardation due to increased crack closure. However, based on a crack length that is slightly less than the critical value at the maximum proof stress, the minimum assured life or proof test interval must be no more than 550 pressure cycles for a 1.33 proof factor and 1530 pressure cycles for a 1.5 proof factor to prevent in-flight failures.

  9. Shielding techniques tackle EMI excesses. V - EMI shielding

    NASA Astrophysics Data System (ADS)

    Grant, P.

    1982-10-01

    The utilization of shielding gaskets in EMI design is presented in terms of seam design, gasket design, groove design, and fastener spacing. The main function of seam design is to minimize the coupling efficiency of a seam, and for effective shielding, seam design should include mating surfaces which are as flat as possible, and a flange width at least five times the maximum anticipated separation between mating surfaces. Seam surface contact with a gasket should be firm, continuous, and uniform. Gasket height, closure pressure, and compression set as a function of the applied pressure parameters are determined using compression/deflection curves. Environmental seal requirements are given and the most common materials used are neoprene, silicone, butadiene-acrylonitrile, and natural rubber. Groove design is also discussed, considering gasket heights and cross-sectional areas. Finally, fastener spacing is considered, by examining deflection as a percentage of gasket height.

  10. An evaluation of the pressure proof test concept for thin sheet 2024-T3

    NASA Technical Reports Server (NTRS)

    Dawicke, D. S.; Poe, C. C., Jr.; Newman, J. C., Jr.; Harris, C. E.

    1990-01-01

    The concept of pressure proof testing of fuselage structures with fatigue cracks to insure structural integrity was evaluated from a fracture mechanics viewpoint. A generic analytical and experimental investigation was conducted on uniaxially loaded flat panels with crack configurations and stress levels typical of longitudinal lap-splice joints in commercial transport aircraft fuselage. The results revealed that the remaining fatigue life after a proof test was longer than that without the proof test because of crack growth retardation due to increased crack closure. However, based on a crack length that is slightly less than the critical value at the maximum proof test stress, the minimum assured life or proof test interval must be no more than 550 pressure cycles for a 1.33 proof factor and 1530 pressure cycles for a 1.5 proof factor to prevent in-flight failures.

  11. An evaluation of the pressure proof test concept for thin sheet 2024-T3

    NASA Technical Reports Server (NTRS)

    Dawicke, D. S.; Poe, C. C., Jr.; Newman, James C., Jr.; Harris, Charles E.

    1990-01-01

    The concept of pressure proof testing of fuselage structures with fatigue cracks to insure structural integrity was evaluated from a fracture mechanics viewpoint. A generic analytical and experimental investigation was conducted on uniaxially loaded flat panels with crack configurations and stress levels typical of longitudinal lap splice joints in commercial transport aircraft fuselages. The results revealed that the remaining fatigue life after a proof test was longer than that without the proof test because of crack growth retardation due to increased crack closure. However, based on a crack length that is slightly less than the critical value at the maximum proof test stress, the minimum assured life or proof test interval must be no more than 550 pressure cycles for a 1.33 proof factor and 1530 pressure cycles for a 1.5 proof factor to prevent in-flight failures.

  12. Strategic Planning: Renewal and Redesign during Turbulent Times

    ERIC Educational Resources Information Center

    Cherrey, Cynthia; Clark, Evette Castillo

    2010-01-01

    In August 2005, Hurricane Katrina, the worst natural disaster in the history of the United States, forced the fall semester closure of Tulane University in New Orleans, Louisiana. In the aftermath of this unprecedented storm, the Tulane leadership set forth a plan for renewal to secure the survival, recovery, and sustainability of the institution,…

  13. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  14. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  15. 50 CFR 665.252 - Harvest limitation program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Grounds for Permit Area 1 will be set annually for the calendar year and shall: (1) Apply to the total... the overall harvest guideline for Crustacean Permit Area 1 will be reached; (ii) Closure date after... Permit Area 1 is prohibited by any permitted vessel that is not operating a VMS unit certified by NMFS...

  16. 40 CFR 258.60 - Closure criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...

  17. 40 CFR 258.60 - Closure criteria.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...

  18. 40 CFR 258.60 - Closure criteria.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...

  19. 40 CFR 258.60 - Closure criteria.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...

  20. 40 CFR 258.60 - Closure criteria.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operators of all MSWLF units must install a final cover system that is designed to minimize infiltration and... greater than 1×10−5 cm/sec, whichever is less, and (2) Minimize infiltration through the closed MSWLF by the use of an infiltration layer that contains a minimum 18-inches of earthen material, and (3...

  1. Casting the Spirit: A Handmade Legacy

    ERIC Educational Resources Information Center

    Rutenberg, Mona

    2008-01-01

    This article discusses how an art therapist working in a hospital palliative care unit has incorporated a ritual of hand casting to help bring closure to dying patients and family members who are grieving as death approaches. The finished hand sculptures depict the hands of the patients and, sometimes, of their loved ones. They are faithful and…

  2. Hibbing Community College's Community Computer Center.

    ERIC Educational Resources Information Center

    Regional Technology Strategies, Inc., Carrboro, NC.

    This paper reports on the development of the Community Computer Center (CCC) at Hibbing Community College (HCC) in Minnesota. HCC is located in the largest U.S. iron mining area in the United States. Closures of steel-producing plants are affecting the Hibbing area. Outmigration, particularly of younger workers and their families, has been…

  3. 50 CFR 648.262 - Accountability measures for red crab limited access vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 10 2011-10-01 2011-10-01 false Accountability measures for red crab... UNITED STATES Management Measures for the Atlantic Deep-Sea Red Crab Fishery § 648.262 Accountability measures for red crab limited access vessels. (a) Closure authority. NMFS shall close the EEZ to fishing...

  4. Prediction and measurement of direct-normal solar irradiance: A closure experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halthore, R.N.; Schwartz, S.E.; Michalsky, J.J.

    1997-03-01

    Direct-normal solar irradiance (DNSI), the total energy in the solar spectrum incident on a plane perpendicular to the Sun`s direction on a unit area at the earth`s surface in unit time, depends only on the atmospheric extinction of sunlight without regard to the details of extinction--whether absorption or scattering. Here the authors describe a set of closure experiments performed in north-central Oklahoma, wherein measured atmospheric composition is input to a radiative transfer model, MODTRAN-3, to predict DNSI, which is then compared to measured values. Thirty six independent comparisons are presented; the agreement between predicted and measured values falls within themore » combined uncertainties in the prediction (2%) and measurement (0.2%) albeit with a slight bias ({approximately} 1% overprediction) that is independent of the solar zenith angle. Thus these results establish the adequacy of current knowledge of the solar spectrum and atmospheric extinction as embodied in MODTRAN-3 for use in climate models. An important consequence is the overwhelming likelihood that the atmospheric clear-sky absorption is accurately described to within comparable uncertainties.« less

  5. Prediction and measurement of direct-normal solar irradiance: A closure experiment

    NASA Technical Reports Server (NTRS)

    Halthore, R. N.; Schwartz, S. E.; Michalsky, J. J.; Anderson, G. P.; Ferrare, R. A.; Ten Brink, H. M.

    1997-01-01

    Direct-Normal Solar Irradiance (DNSI), the total energy in the solar spectrum incident on a plane perpendicular to the Sun's direction on a unit area at the earth's surface in unit time, depends only on the atmospheric extinction of sunlight without regard to the details of extinction-whether absorption or scattering. Here the authors describe a set of closure experiments performed in north-central Oklahoma, wherein measured atmospheric composition is input to a radiative transfer model, MODTRAN-3, to predict DNSI, which is then compared to measured values. Thirty six independent comparisons are presented; the agreement between predicted and measured values falls within the combined uncertainties in the prediction (2%) and measurement (0.2%) albeit with a slight bias ((approximately) 1% overprediction) that is independent of the solar zenith angle. Thus these results establish the adequacy of current knowledge of the solar spectrum and atmospheric extinction as embodied in MODTRAN-3 for use in climate models. An important consequence is the overwhelming likelihood that the atmospheric clear-sky absorption is accurately described to within comparable uncertainties.

  6. Portable Roller Staking Tool

    NASA Technical Reports Server (NTRS)

    Bird, R. G.; Berson, L. A.

    1983-01-01

    Staking tool compact and portable. Tool combines clamping and staking operations in single unit. Tool clamps workpiece (a bearing or bushing), alines it, and stakes on of flat faces. Used for most roller staking operations which acess both faces of workpiece.

  7. Closeup view of EPA Farm cattle shelter lamp, facing west ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Close-up view of EPA Farm cattle shelter lamp, facing west - Nevada Test Site, Environmental Protection Agency Farm, Shelter Unit Type, Area 15, Yucca Flat, 10-2 Road near Circle Road, Mercury, Nye County, NV

  8. View of EPA Farm cattle shelter (featuring horse trailer), facing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of EPA Farm cattle shelter (featuring horse trailer), facing northwest - Nevada Test Site, Environmental Protection Agency Farm, Shelter Unit Type, Area 15, Yucca Flat, 10-2 Road near Circle Road, Mercury, Nye County, NV

  9. Analyzing the propagation behavior of scintillation index and bit error rate of a partially coherent flat-topped laser beam in oceanic turbulence.

    PubMed

    Yousefi, Masoud; Golmohammady, Shole; Mashal, Ahmad; Kashani, Fatemeh Dabbagh

    2015-11-01

    In this paper, on the basis of the extended Huygens-Fresnel principle, a semianalytical expression for describing on-axis scintillation index of a partially coherent flat-topped (PCFT) laser beam of weak to moderate oceanic turbulence is derived; consequently, by using the log-normal intensity probability density function, the bit error rate (BER) is evaluated. The effects of source factors (such as wavelength, order of flatness, and beam width) and turbulent ocean parameters (such as Kolmogorov microscale, relative strengths of temperature and salinity fluctuations, rate of dissipation of the mean squared temperature, and rate of dissipation of the turbulent kinetic energy per unit mass of fluid) on propagation behavior of scintillation index, and, hence, on BER, are studied in detail. Results indicate that, in comparison with a Gaussian beam, a PCFT laser beam with a higher order of flatness is found to have lower scintillations. In addition, the scintillation index and BER are most affected when salinity fluctuations in the ocean dominate temperature fluctuations.

  10. An Unusual Inverted Saline Microbial Mat Community in an Interdune Sabkha in the Rub' al Khali (the Empty Quarter), United Arab Emirates

    PubMed Central

    McKay, Christopher P.; Rask, Jon C.; Detweiler, Angela M.; Bebout, Brad M.; Everroad, R. Craig; Lee, Jackson Z.; Chanton, Jeffrey P.; Mayer, Marisa H.; Caraballo, Adrian A. L.; Kapili, Bennett; Al-Awar, Meshgan; Al-Farraj, Asma

    2016-01-01

    Salt flats (sabkha) are a recognized habitat for microbial life in desert environments and as analogs of habitats for possible life on Mars. Here we report on the physical setting and microbiology of interdune sabkhas among the large dunes in the Rub' al Khali (the Empty Quarter) in Liwa Oasis, United Arab Emirates. The salt flats, composed of gypsum and halite, are moistened by relatively fresh ground water. The result is a salinity gradient that is inverted compared to most salt flat communities with the hypersaline layer at the top and freshwater layers below. We describe and characterize a rich photosynthetically-based microbial ecosystem that is protected from the arid outside environment by a translucent salt crust. Gases collected from sediments under shallow ponds in the sabkha contain methane in concentrations as high as 3400 ppm. The salt crust could preserve biomarkers and other evidence for life in the salt after it dries out. Chloride-filled depressions have been identified on Mars and although surface flow of water is unlikely on Mars today, ground water is possible. Such a near surface system with modern groundwater flowing under ancient salt deposits could be present on Mars and could be accessed by surface rovers. PMID:26982497

  11. Geologic controls on gas hydrate occurrence in the Mount Elbert prospect, Alaska North Slope

    USGS Publications Warehouse

    Boswell, R.; Rose, K.; Collett, T.S.; Lee, M.; Winters, W.; Lewis, K.A.; Agena, W.

    2011-01-01

    Data acquired at the BPXA-DOE-USGS Mount Elbert Gas Hydrate Stratigraphic Test Well, drilled in the Milne Point area of the Alaska North Slope in February, 2007, indicates two zones of high gas hydrate saturation within the Eocene Sagavanirktok Formation. Gas hydrate is observed in two separate sand reservoirs (the D and C units), in the stratigraphically highest portions of those sands, and is not detected in non-sand lithologies. In the younger D unit, gas hydrate appears to fill much of the available reservoir space at the top of the unit. The degree of vertical fill with the D unit is closely related to the unit reservoir quality. A thick, low-permeability clay-dominated unit serves as an upper seal, whereas a subtle transition to more clay-rich, and interbedded sand, silt, and clay units is associated with the base of gas hydrate occurrence. In the underlying C unit, the reservoir is similarly capped by a clay-dominated section, with gas hydrate filling the relatively lower-quality sands at the top of the unit leaving an underlying thick section of high-reservoir quality sands devoid of gas hydrate. Evaluation of well log, core, and seismic data indicate that the gas hydrate occurs within complex combination stratigraphic/structural traps. Structural trapping is provided by a four-way fold closure augmented by a large western bounding fault. Lithologic variation is also a likely strong control on lateral extent of the reservoirs, particularly in the D unit accumulation, where gas hydrate appears to extend beyond the limits of the structural closure. Porous and permeable zones within the C unit sand are only partially charged due most likely to limited structural trapping in the reservoir lithofacies during the period of primary charging. The occurrence of the gas hydrate within the sands in the upper portions of both the C and D units and along the crest of the fold is consistent with an interpretation that these deposits are converted free gas accumulations formed prior to the imposition of gas hydrate stability conditions. ?? 2009.

  12. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less

  13. The Collyhurst Sandstone as a secondary storage unit for CCS in the East Irish Sea Basin (UK)

    NASA Astrophysics Data System (ADS)

    Gamboa, D.; Williams, J. D. O.; Kirk, K.; Gent, C. M. A.; Bentham, M.; Schofield, D. I.

    2016-12-01

    Carbon Capture and Storage (CCS) is key technology for low-carbon energy and industry. The UK hosts a large CO2 storage potential offshore with an estimated capacity of 78 Gt. The East Irish Sea Basin (EISB) is the key area for CCS in the western UK, with a CO2 storage potential of 1.7 Gt in hydrocarbon fields and in saline aquifers within the Triassic Sherwood Sandstone Formation. However, this theoretical storage capacity does not consider the secondary storage potential in the lower Permian Collyhurst Sandstone Formation. 3D seismic data were used to characterise the Collyhurst Sandstone Formation in the EISB. On the southern basin domain, numerous fault-bound blocks limit the lateral continuity of the sandstone strata, while on the northern domain the sandstones are intersected by less faults. The caprock for the Collyhurst sandstones is variable. The Manchester Marls predominate in the south, transitioning to the St. Bees evaporites towards the north. The evaporites in the EISB cause overburden faults to terminate or detach along Upper Permian strata, limiting the deformation of the underlying reservoir units. Five main storage closures have been identified in the Permian strata. In the southern and central area these are predominantly fault bounded, occurring at depths over 1000m. Despite the higher Collyhurst sandstone thickness in the southern IESB, the dolomitic nature of the caprock constitutes a storage risk in this area. Closures in the northern area are deeper (around 2000-2500m) and wider, reaching areas of 34Km2, and are overlain by evaporitic caprocks. The larger Collyhurst closures to the north underlie large Triassic fields with high storage potential. The spatial overlap favours storage plans including secondary storage units in the EISB. The results of this work also expand the understanding of prospective areas for CO2 sequestration in the East Irish Sea Basin in locations where the primary Sherwood Sandstone Formation is either too shallow, discontinuous or eroded.

  14. Post-Closure Inspection Report for the Tonopah Test Range, Nevada: For Calendar Year 2017, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarado, Juan; Matthews, Patrick

    This report provides the results of the annual post-closure inspections conducted at the closed corrective action units (CAUs) located on the Tonopah Test Range (TTR) and the Nevada Test and Training Range (NTTR). This report covers calendar year 2017 and includes visual inspection and repair activities completed at the following CAUs: CAU 400: Bomblet Pit and Five Points Landfill (TTR) CAU 407: Roller Coaster RadSafe Area (TTR) CAU 424: Area 3 Landfill Complexes (TTR) CAU 453: Area 9 UXO Landfill (TTR) CAU 487: Thunderwell Site (TTR) Visual inspections were conducted according to the post-closure plans in the approved closure reportsmore » and subsequent correspondence with the Nevada Division of Environmental Protection. The annual post-closure inspections were conducted on May 23, 2017. No maintenance or repair issues were noted at CAU 400 and CAU 487. Maintenance items and subsequent repairs include the following: CAU 407: A large animal burrow was observed in the southeast corner of the cover during the inspection. Two additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018. CAU 424: CAS 03-08-002-A304 (Landfill Cell A3-4): A new monument was installed and the subsidence area was repaired on January 9, 2018. CAU 424: CAS 03-08-002-A308 (Landfill Cell A3-8): Lava rock, used to mark the two eastern monument locations, was noted as missing during the inspection. The lava rock was replaced on January 9, 2018. CAU 453: Five large animal burrows, located near the east–central portion of cover, was noted during the inspection. Eight additional animal burrows were discovered during repair actions. All cover defects were repaired on January 9, 2018.« less

  15. Time to wound closure in trauma patients with disorders in wound healing is shortened by supplements containing antioxidant micronutrients and glutamine: a PRCT.

    PubMed

    Blass, Sandra C; Goost, Hans; Tolba, René H; Stoffel-Wagner, Birgit; Kabir, Koroush; Burger, Christof; Stehle, Peter; Ellinger, Sabine

    2012-08-01

    : We hypothesize that wound closure in trauma patients with disorders in wound healing is accelerated by supplementation of antioxidant micronutrients and glutamine. In a randomized, double-blind, placebo-controlled trial, 20 trauma patients with disorders in wound healing were orally supplemented with antioxidant micronutrients (ascorbic acid, α-tocopherol, β-carotene, zinc, selenium) and glutamine (verum) or they received isoenergetic amounts of maltodextrine (placebo) for 14 days. Plasma/serum levels of micronutrients, glutamine, and vascular endothelial growth factor-A (VEGF-A) were determined before and after supplementation. In the wound, several parameters of microcirculation were measured. Time from study entry to wound closure was recorded. Micronutrients in plasma/serum did not change except for selenium which increased in the verum group (1.1 ± 0.2 vs. 1.4 ± 0.2 μmol/l; P = 0.009). Glutamine decreased only in the placebo group (562 ± 68 vs. 526 ± 55 μmol/l; P = 0.047). The prevalence of hypovitaminoses and the concentration of VEGF-A did not change. Considering microcirculation, only O(2)-saturation decreased in the placebo group (56.7 ± 23.4 vs. 44.0 ± 24.0 [arbitrary units]; P = 0.043). Wound closure occurred more rapidly in the verum than in the placebo group (35 ± 22 vs. 70 ± 35 d; P = 0.01). Time to wound closure can be shortened by oral antioxidant and glutamine containing supplements in trauma patients with disorders in wound healing. Copyright © 2012 Elsevier Ltd and European Society for Clinical Nutrition and Metabolism. All rights reserved.

  16. Choledochorraphy (primary repair) versus t-tube drainage after open choledochotomy.

    PubMed

    Saeed, Nadia; Nasir, Muhammad Tauqeer; Khan, Muhammad Iqbal; Channa, Ghulam Asghar

    2012-01-01

    T-tube drainage used to be standard practice after surgical choledochotomy, but there is now a tendency in some canters to close the common bile duct primarily. This study was designed to compare the clinical results of primary closure with T-tube drainage after open choledocotomy and assess the safety of primary closure for future application. This study was conducted at surgical Unit-3, ward 26 Jinnah Postgraduate Medical Centre Karachi, from January 2007 to January 2008. Forty patients were included in this study out of which 20 underwent primary closure and 20 T-tube placements. It was Quasi-experimental, non-probability, purposive sampling. Main outcome measures were operating time, duration of hospital stay, and postoperative complications. SPSS-10 was used for data analysis. The age of patients in the study ranged from 29-83 years. There were 3 male while 37 female patients. Group-1 consisted of 20 patients underwent primary closure after choledocotomy, while Group-2 also consisted of 20 patients underwent T-tube drainage after duct exploration. Mean hospital stay in Group-1 patients was 7.63 days while in group 2 it was 13.6 days. Overall complication rate in group 1 was 15%, biliary leakage in 1 (5%), jaundice in 1 (5%), wound infection in 1 (5%). No re-exploration was required in Group-1. In Group-2 overall complication rate was 30%, biliary leakage in 2 (2%), jaundice in 1 (5%), dislodgement of T-tube in 1 (5%), wound infection in 1 (5%), and sepsis in 1 (5%) patients. Re-exploration was done in one patient. Primary closure of Common Bile Duct (CBD) is a safe and cost-effective alternative procedure to routine T-tube drainage after open choledocotomy.

  17. Orthodontic space closure without contralateral extraction through mesial movement of lower molars in patients with aplastic lower second premolars.

    PubMed

    Zimmer, B; Guitard, Y

    2001-09-01

    A method is presented that allows unilateral space closure in patients with aplastic lower second premolars. Based on a straight-wire appliance, space closure was achieved with a combination of "push mechanics" using the second molar as an anchorage unit and Class II "pull mechanics", thus avoiding the application of any distalizing force on the lower incisors. The results from 13 consecutively treated subjects (five boys, eight girls, mean age 12 years and 6 months) were analyzed. Complete bodily space closure was achieved in all 13 cases within a mean treatment time of 2 years and 7 months. The desired Angle Class III molar relationship of one premolar width (+/- 1/4 premolar width) on the aplastic side was successful in eleven patients, an additional 4.7 mm of space being created for the third molar on the aplastic side compared with the contralateral side (p < or = 0.01). However, adverse effects could be kept to a minimum, with no method-dependent side effects being recorded with regard to canine and molar relationships on the contralateral side, or to overbite, overjet, or upper and lower incisor inclination. The mean lower midline shift of 0.8 mm was in accordance with the mean distal canine relationship of 1/3 premolar width on the aplastic side. These results confirm that orthodontic space closure in cases of unilateral aplastic lower second premolars can be performed successfully with the presented treatment method without the need for additional premolar extractions, prosthodontic treatment or implants. Furthermore, the prognosis for the lower wisdom tooth on the aplastic side is improved.

  18. Body mass index affects time to definitive closure after damage control surgery.

    PubMed

    Haricharan, Ramanath N; Dooley, Adam C; Weinberg, Jordan A; McGwin, Gerald; MacLennan, Paul A; Griffin, Russell L; Rue, Loring W; Reiff, Donald A

    2009-06-01

    A growing body of literature demonstrates that irrespective of the mechanism of injury, obesity is associated with significantly worse morbidity and mortality after trauma. Among patients requiring damage control laparotomy (DCL), clinical experience suggests that obesity affects time to definitive closure though this association has never been demonstrated quantitatively. All patients at an academic Level I trauma center requiring a DCL between January 2002 and December 2006 (N = 148) were included. Information pertaining to demographic, injury, and clinical characteristics was abstracted from patient medical records. The risk of specific complications including pneumonia, renal failure, and sepsis was compared between normal and overweight/obese patients, as measured by body mass index (BMI). The lengths of intensive care unit (ICU) stay and mechanical ventilation as well as time to abdominal closure were also compared. The risk of pneumonia, sepsis, and renal failure was 2.05-times, 1.77-times, and 2.84-times higher among overweight patients compared with patients with a normal BMI. The risk of pneumonia, sepsis, and renal failure was 2.01-times, 4.24-times, and 1.85-times higher among obese patients compared with those with a normal BMI. Obese patients also had a significantly longer ICU length of stay (28.7 days vs. 15.1 days; p < 0.0001), longer hospitalization (39.3 days vs. 27.0 days; p = 0.008), and time to definitive closure (8.4 days vs. 3.9 days; p = 0.03) compared with patients with a normal BMI. Among patients requiring DCL, those who are overweight or obese have a prolonged time to definitive closure. These patients also experience a significantly longer ICU course and a higher risk of pneumonia.

  19. Comparison of two dose regimens of ibuprofen for the closure of patent ductus arteriosus in preterm newborns.

    PubMed

    Dornelles, Laura Vargas; Corso, Andréa Lúcia; Silveira, Rita de Cássia; Procianoy, Renato Soibelmann

    2016-01-01

    To compare the efficacy of intravenous ibuprofen at high (20-10-10mg/kg/dose) and low doses (10-5-5mg/kg/dose) the closure of patent ductus arteriosus in preterm newborns. A cohort study with historical control of newborns that received high- and low-dose intravenous ibuprofen, from 2010 to 2013 in a neonatal intensive care unit, for closure of the patent ductus arteriosus, documented by echocardiography. Secondary outcomes included the number of ibuprofen cycles, incidence of bronchopulmonary dysplasia, necrotizing enterocolitis, changes in renal function, and death. Seventy-seven patients received three doses of ibuprofen for the treatment of patent ductus arteriosus, with 33 receiving high-dose and 44 low-dose therapy. The ductus closed after the first cycle in 25 (56.8%) low-dose patients and in 17 (51.5%) high-dose patients (p>0.99). Sixteen patients received a second cycle of ibuprofen, and the ductus closed in 50% after low-dose and in 60% after high-dose therapy (p>0.99). Seven patients required surgery for ductus closure, 13.6% in the low-dose group and 3% in the high-dose group (p=0.22). Thirty-nine patients developed bronchopulmonary dysplasia, 50% in the low-dose group and 51.5% in the high-dose group (p>0.99). Twenty-two (50%) low-dose patients died vs. 15 (45.5%) high-dose patients (p=0.86). There was no difference in closure of the ductus arteriosus or occurrence of adverse effects between the two dose regimens. Copyright © 2016 Sociedade Brasileira de Pediatria. Published by Elsevier Editora Ltda. All rights reserved.

  20. Natural evolution of patent ductus arteriosus in the extremely preterm infant.

    PubMed

    Rolland, Audrey; Shankar-Aguilera, Shivani; Diomandé, Douty; Zupan-Simunek, Véronique; Boileau, Pascal

    2015-01-01

    The persistence of the patent ductus arteriosus (PDA) is frequently encountered in very preterm infants. Neither preventive nor curative treatments of PDA have been shown to improve the outcome of these infants. Since no consensus on optimal treatment of PDA is established, we evaluated the rate of spontaneous PDA closure in infants born before 28 weeks of gestation. We studied a retrospective cohort of 103 infants (gestational age 24-27 weeks) admitted to our neonatal intensive care unit from 1 June 2008 to 31 July 2010. Maternal and neonatal characteristics were collected. The PDA was defined by the persistence of ductal patency after 72 h and was followed up by regular echocardiography. Twelve infants died within the first 72 h and were excluded from the analysis. Among 91 infants analysed, 8 (9%) closed their ductus arteriosus before 72 h and the ductus could not be determined patent in 13. Of the 70 infants with a PDA still persistent, one underwent surgical ligation and echocardiography showed spontaneous closure in 51 (73%) of them. In the remaining 18 infants, the date of PDA closure could not be determined either because of their death (n=11) or due to discharge (n=7). Overall, a spontaneous closure of the ductus arteriosus was observed in 59 of the 91 infants. We have to question whether exposure to the risks of therapeutic interventions targeted for ductal closure is warranted since a PDA closes spontaneously in at least 73% of infants born before 28 weeks. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

Top