Sample records for flight ready status

  1. The Pamela experiment ready for flight

    NASA Astrophysics Data System (ADS)

    Adriani, O.; Albi, M.; Altamura, F.; Ambriola, M.; Bakaldin, A.; Barbarino, G. C.; Basili, A.; Bazilevskaja, G.; Bellotti, R.; Bencardino, R.; Boezio, M.; Bogomolov, E.; Bonechi, L.; Bongi, M.; Bongiorno, L.; Bonvicini, V.; Boscherini, M.; Bottai, S.; Cafagna, F.; Campana, D.; Carlson, P.; Casolino, M.; Castellini, G.; Circella, M.; De Marzo, C.; De Pascale, M. P.; Fedele, D.; Galper, A. M.; Grigorjeva, A.; Grandi, M.; Hofverberg, P.; Koldashov, S. V.; Korotkov, M. G.; Krutkov, S.; Lund, J.; Lundquist, J.; Malvezzi, V.; Marcelli, L.; Menn, W.; Mikhailov, V. V.; Minori, M.; Mitchell, J. W.; Mocchiutti, E.; Morselli, A.; Mukhametshin, R.; Nagni, M.; Orsi, S.; Osteria, G.; Papini, P.; Pearce, M.; Picozza, P.; Ricci, M.; Ricciarini, S.; Russo, S.; Schiavon, P.; Simon, M.; Spillantini, P.; Sparvoli, R.; Stephens, S. A.; Stochaj, S. J.; Stozhkov, R. Y.; Streitmatter, E.; Taddei, E.; Vacchi, A.; Vannuccini, E.; Vasiljev, G.; Voronov, S. A.; Yurkin, Y.; Zampa, G.; Zampa, N.

    2007-03-01

    The Pamela apparatus will allow precise measurements of cosmic rays in Low Earth Orbit, mainly focusing on the antiparticles component. The apparatus is now ready for flight, and the launch is foreseen during June 2006. The paper briefly reports the status of the experiment, and the performances of the various components as measured before the launch.

  2. 14 CFR Section 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... expenses incurred directly in the in-flight operation of aircraft and expenses attaching to the holding of aircraft and aircraft operational personnel in readiness for assignment to an in-flight status. (b) This... personnel for flight assignment. Such expenses shall be included in function 5400 Maintenance or function...

  3. 14 CFR Section 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... expenses incurred directly in the in-flight operation of aircraft and expenses attaching to the holding of aircraft and aircraft operational personnel in readiness for assignment to an in-flight status. (b) This... personnel for flight assignment. Such expenses shall be included in function 5400 Maintenance or function...

  4. 14 CFR Section 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... expenses incurred directly in the in-flight operation of aircraft and expenses attaching to the holding of aircraft and aircraft operational personnel in readiness for assignment to an in-flight status. (b) This... personnel for flight assignment. Such expenses shall be included in function 5400 Maintenance or function...

  5. 14 CFR Section 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... expenses incurred directly in the in-flight operation of aircraft and expenses attaching to the holding of aircraft and aircraft operational personnel in readiness for assignment to an in-flight status. (b) This... personnel for flight assignment. Such expenses shall be included in function 5400 Maintenance or function...

  6. An American knowledge base in England - Alternate implementations of an expert system flight status monitor

    NASA Technical Reports Server (NTRS)

    Butler, G. F.; Graves, A. T.; Disbrow, J. D.; Duke, E. L.

    1989-01-01

    A joint activity between the Dryden Flight Research Facility of the NASA Ames Research Center (Ames-Dryden) and the Royal Aerospace Establishment (RAE) on knowledge-based systems has been agreed. Under the agreement, a flight status monitor knowledge base developed at Ames-Dryden has been implemented using the real-time AI (artificial intelligence) toolkit MUSE, which was developed in the UK. Here, the background to the cooperation is described and the details of the flight status monitor and a prototype MUSE implementation are presented. It is noted that the capabilities of the expert-system flight status monitor to monitor data downlinked from the flight test aircraft and to generate information on the state and health of the system for the test engineers provides increased safety during flight testing of new systems. Furthermore, the expert-system flight status monitor provides the systems engineers with ready access to the large amount of information required to describe a complex aircraft system.

  7. Support activities to maintain SUMS flight readiness, volume 2. Attachment A: Flight 61-C report

    NASA Technical Reports Server (NTRS)

    Wright, Willie

    1992-01-01

    The Shuttle Upper Atmosphere Mass Spectrometer (SUMS), a component experiment of the NASA Orbital Experiments Program (OEX), was flown aboard the shuttle Columbia (OV102) mounted at the forward end of the nose landing gear well with an atmospheric gas inlet system fitted to the lower fuselage (chin panel) surface. The SUMS was designed to provide atmospheric data in flow regimes inaccessible prior to the development of the Space Transportation system (STS). The experiment mission operation begins about 1 hour to shuttle de-orbit entry maneuver and continues until reaching 1.6 torr (about 86 km altitude). The SUMS flew a total of three missions, 61C, STS-35, and STS-40. Between flights, the SUMS was maintained in flight ready status. The flight data has been analyzed by the NASA LaRC Aerothermodynamics Branch. Flight data spectrum plots and reports are presented in the Appendices to the Final Technical Report for NAS1-17399. This volume is the flight data report for flight 61-C.

  8. Support activities to maintain SUMS flight readiness, volume 3. Attachment B: Flight STS-35 report, section A

    NASA Technical Reports Server (NTRS)

    Wright, Willie

    1992-01-01

    The Shuttle Upper Atmosphere Mass Spectrometer (SUMS), a component experiment of the NASA Orbital Experiments Program (OEX), was flown aboard the shuttle Columbia (OV102) mounted at the forward end of the nose landing gear well with an atmospheric gas inlet system fitted to the lower fuselage (chin panel) surface. The SUMS was designed to provide atmospheric data in flow regimes inaccessible prior to the development of the Space Transportation System (STS). The experiment mission operation begins about 1 hour prior to shuttle de-orbit entry maneuver and continues until reaching 1.6 torr (about 86 km altitude). The SUMS flew a total of three missions, 61C, STS-35, and STS-40. Between flights, the SUMS was maintained in flight ready status. The flight data has been analyzed by the NASA LaRC Aerothermodynamics Branch. Flight data spectrum plots and reports are presented in the Appendices to the Final Technical Report for NAS1-17399. This volume presents flight data for flight STS-35 in graphical format.

  9. 14 CFR 415.37 - Flight readiness and communications plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Flight readiness and communications plan... a Federal Launch Range § 415.37 Flight readiness and communications plan. (a) Flight readiness requirements. An applicant must designate an individual responsible for flight readiness. The applicant must...

  10. Support activities to maintain SUMS flight readiness, volume 7. Attachment B: Flight STS-35 report, section E

    NASA Technical Reports Server (NTRS)

    Wright, Willie

    1992-01-01

    The Shuttle Upper Atmosphere Mass Spectrometer (SUMS), a component experiment of the NASA Orbital Experiments Program (OEX), was flown aboard the shuttle Columbia (OV102) mounted at the forward end of the nose landing gear well with an atmospheric gas inlet system fitted to the lower fuselage (chin panel) surface. The SUMS was designed to provide atmospheric data in flow regimes inaccessible prior to the development of the Space Transportation System (STS). The experiment mission operation begins about 1 hour prior to shuttle de-orbit entry maneuver and continues until reaching 1.6 torr (about 86 km altitude). The SUMS flew a total of three missions, 61C, STS-35, STS-40. Between flights, the SUMS was maintained in flight ready status. The flight data has been analyzed by the NASA LaRC Aerothermodynamics Branch. Flight data spectrum plots and reports are presented in the Appendices to the Final Technical Report for NAS1-17399. This volume presents data from the reentry of flight STS-35 in tabular and graphical format.

  11. Support activities to maintain SUMS flight readiness, volume 8. Attachment B: Flight STS-35 report, section F

    NASA Technical Reports Server (NTRS)

    Wright, Willie

    1992-01-01

    The Shuttle Upper Atmosphere Mass Spectrometer (SUMS), a component experiment of the NASA Orbital Experiments Program (OEX), was flown aboard the shuttle Columbia (OV102) mounted at the forward end of the nose landing gear well with an atmospheric gas inlet system fitted to the lower fuselage (chin panel) surface. The SUMS was designed to provide atmospheric data in flow regimes inaccessible prior to the development of the Space Transportation System (STS). The experiment mission operation begins about 1 hour prior to shuttle de-orbit entry maneuver and continues until reaching 1.6 torr (about 86 km altitude). The SUMS flew a total of three missions, 61C, STS-35, STS-40. Between flights, the SUMS was maintained in flight ready status. The flight data has been analyzed by the NASA LaRC Aerothermodynamics Branch. Flight data spectrum plots and reports are presented in the Appendices to the Final Technical Report for NAS1-17399. This volume presents tabular and graphical spectral data of the reentry of flight STS-35.

  12. Design, Integration, Certification and Testing of the Orion Crew Module Propulsion System

    NASA Technical Reports Server (NTRS)

    McKay, Heather; Coffman, Eric; May, Sarah; Freeman, Rich; Cain, George; Albright, John; Schoenberg, Rich; Delventhal, Rex

    2014-01-01

    The Orion Crew Module Propulsion Reaction Control System is currently complete and ready for flight as part of the Orion program's first flight test, Exploration Flight Test One (EFT-1). As part of the first article design, build, test, and integration effort, several key lessons learned have been noted and are planned for incorporation into the next build of the system. This paper provides an overview of those lessons learned and a status on the Orion propulsion system progress to date.

  13. Space shuttle orbiter avionics software: Post review report for the entry FACI (First Article Configuration Inspection). [including orbital flight tests integrated system

    NASA Technical Reports Server (NTRS)

    Markos, H.

    1978-01-01

    Status of the computer programs dealing with space shuttle orbiter avionics is reported. Specific topics covered include: delivery status; SSW software; SM software; DL software; GNC software; level 3/4 testing; level 5 testing; performance analysis, SDL readiness for entry first article configuration inspection; and verification assessment.

  14. Virtual Reality: Ready or Not!

    ERIC Educational Resources Information Center

    Lewis, Joan E.

    1994-01-01

    Describes the development and current status of virtual reality (VR) and VR research. Market potentials for VR are discussed, including the entertainment industry, health care and medical training, flight and other simulators, and educational possibilities. A glossary of VR-related terms is included. (LRW)

  15. The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII): Towards the First Flight

    NASA Technical Reports Server (NTRS)

    Rizzo, Maxime J.; Rinehart, S. A.; Dhabal, A.; Ade, P.; Benford, D. J.; Fixsen, D. J.; Griffin, M.; Juanola Parramon, R.; Leisawitz, D. T.; Maher, S. F.; hide

    2016-01-01

    The Balloon Experimental Twin Telescope for Infrared Interferometry (BETTII) is a balloon-borne, far-infrared direct detection interferometer with a baseline of 8 m and two collectors of 50 cm. It is designed to study galactic clustered star formation by providing spatially-resolved spectroscopy of nearby star clusters. It is being assembled and tested at NASA Goddard Space Flight Center for a first flight in Fall 2016. We report on recent progress concerning the pointing control system and discuss the overall status of the project as it gets ready for its commissioning flight.

  16. 14 CFR 24 - Profit and Loss Elements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... aircraft operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall... total operating expenses from the total operating revenues. (g) “Nonoperating Income and Expense” shall... a hotel or motel would be reported under this category. This category shall also include the total...

  17. 14 CFR Section 24 - Profit and Loss Elements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...

  18. 14 CFR Section 24 - Profit and Loss Elements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...

  19. 14 CFR Section 24 - Profit and Loss Elements

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Maintenance Burden” shall reflect a memorandum allocation by each air carrier of the total expenses included... operation personnel in readiness for assignment to an in-flight status. (2) “Maintenance” shall include all... line 5 of this schedule. (f) “Operating Profit (Loss)” shall be computed by subtracting the total...

  20. KSC technicians on team to modify X-34

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The modified X-34, known as A-1A, rests in the background of the Dryden Flight Research Center at Edwards Air Force Base, Calif., while an integrated team of KSC, Dryden Flight Research Center and Orbital Sciences Corporation engineers and technicians bring the X-34 A-1A vehicle closer to test flight readiness. Since September, eight NASA engineering technicians from KSC's Engineering Prototype Lab have assisted in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air- launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala.

  1. STS-114: Discovery Day 13 Mission Status Briefing

    NASA Technical Reports Server (NTRS)

    2005-01-01

    LeRoy Cain, STS-114 Ascent/Entry Flight Director, takes a solo stand with the Press in this briefing. He reports that the vehicle is in good shape, consumable status is excellent, and the shuttle crew is in high spirits and preparing for de-orbit and landing. LeRoy and his team have completed the entry system check up, flight control check up, reactor control system check up, and noted that all are at nominal performance; weather forecast is very good, the Entry team is ready and looking forward to de-orbit and landing at the Kennedy Space Center on Monday, August 8th. Re-entry, personal feelings, Columbia accident, data gathering, consumable situation, back up sites, weather, communication block out, night and day landing, and Commander Collin's piloting skills during night flight are some of the topics covered with the News media.

  2. Support activities to maintain SUMS flight readiness

    NASA Technical Reports Server (NTRS)

    Wright, Willie

    1992-01-01

    The Shuttle Upper Atmosphere Mass Spectrometer (SUMS), a component experiment of the NASA Orbital Experiments Program (OEX), was flown aboard the shuttle Columbia (OV102) mounted at the forward end of the nose landing gear well with an atmospheric gas inlet system fitted to the lower fuselage (chin panel) surface. The SUMS was designed to provide atmospheric data in flow regimes inaccessible prior to the development of the Space Transportation System (STS). The experiment mission operation began about one hour prior to shuttle de-orbit entry maneuver and continued until reaching 1.6 torr (about 86 km altitude). The SUMS mass spectrometer consists of the spare unit from the Viking mission to Mars. Bendix Aerospace under contract to NASA LaRC incorporated the Viking mass spectrometer, a microprocessor based logic card, a pressurized instrument case, and the University of Texas at Dallas provided a gas inlet system into a configuration suited to interface with the shuttle Columbia. The SUMS experiment underwent static and dynamic calibration as well as vacuum maintenance before and after STS 40 shuttle flight. The SUMS flew a total of 3 times on the space shuttle Columbia. Between flights the SUMS was maintained in flight ready status. The flight data has been analyzed by the NASA LaRC Aerothermodynamics Branch. Flight data spectrum plots and reports are presented in the Appendices to the Final Technical Report for NAS1-17399.

  3. Skylab rescue space vehicle flight readiness test

    NASA Technical Reports Server (NTRS)

    Jevitt, S. J.

    1973-01-01

    A Skylab Rescue Space Vehicle flight readiness test is described which ensures that space vehicle systems are in a state of flight readiness and are compatible with associated ground support equipment. The functions of propellant loading, umbilical ejection, ignition, holddown arm release, liftoff, and service arm and tail service mast retraction are simulated. The test outline is presented along with a list of references, intercommunications information, operations interface control chart, and flight test.

  4. International Space Station Payload Operations Integration

    NASA Technical Reports Server (NTRS)

    Fanske, Elizabeth Anne

    2011-01-01

    The Payload Operations Integrator (POINT) plays an integral part in the Certification of Flight Readiness process for the Mission Operations Laboratory and the Payload Operations Integration Function that supports International Space Station Payload operations. The POINTs operate in support of the POIF Payload Operations Manager to bring together and integrate the Certification of Flight Readiness inputs from various MOL teams through maintaining an open work tracking log. The POINTs create monthly metrics for current and future payloads that the Payload Operations Integration Function supports. With these tools, the POINTs assemble the Certification of Flight Readiness package before a given flight, stating that the Mission Operations Laboratory is prepared to support it. I have prepared metrics for Increment 29/30, maintained the Open Work Tracking Logs for Flights ULF6 (STS-134) and ULF7 (STS-135), and submitted the Mission Operations Laboratory Certification of Flight Readiness package for Flight 44P to the Mission Operations Directorate (MOD/OZ).

  5. Initial Assessment of the Ares I-X Launch Vehicle Upper Stage to Vibroacoustic Flight Environments

    NASA Technical Reports Server (NTRS)

    Larko, Jeffrey M.; Hughes, William O.

    2008-01-01

    The Ares I launch vehicle will be NASA s first new launch vehicle since 1981. Currently in design, it will replace the Space Shuttle in taking astronauts to the International Space Station, and will eventually play a major role in humankind s return to the Moon and eventually to Mars. Prior to any manned flight of this vehicle, unmanned test readiness flights will be flown. The first of these readiness flights, named Ares I-X, is scheduled to be launched in April 2009. The NASA Glenn Research Center is responsible for the design, manufacture, test and analysis of the Ares I-X upper stage simulator (USS) element. As part of the design effort, the structural dynamic response of the Ares I-X launch vehicle to its vibroacoustic flight environments must be analyzed. The launch vehicle will be exposed to extremely high acoustic pressures during its lift-off and aerodynamic stages of flight. This in turn will cause high levels of random vibration on the vehicle's outer surface that will be transmitted to its interior. Critical flight equipment, such as its avionics and flight guidance components are susceptible to damage from this excitation. This study addresses the modelling, analysis and predictions from examining the structural dynamic response of the Ares I-X upper stage to its vibroacoustic excitations. A statistical energy analysis (SEA) model was used to predict the high frequency response of the vehicle at locations of interest. Key to this study was the definition of the excitation fields corresponding to lift off acoustics and the unsteady aerodynamic pressure fluctuations during flight. The predicted results will be used by the Ares I-X Project to verify the flight qualification status of the Ares I-X upper stage components.

  6. Generation of Simulated Tracking Data for LADEE Operational Readiness Testing

    NASA Technical Reports Server (NTRS)

    Woodburn, James; Policastri, Lisa; Owens, Brandon

    2015-01-01

    Operational Readiness Tests were an important part of the pre-launch preparation for the LADEE mission. The generation of simulated tracking data to stress the Flight Dynamics System and the Flight Dynamics Team was important for satisfying the testing goal of demonstrating that the software and the team were ready to fly the operational mission. The simulated tracking was generated in a manner to incorporate the effects of errors in the baseline dynamical model, errors in maneuver execution and phenomenology associated with various tracking system based components. The ability of the mission team to overcome these challenges in a realistic flight dynamics scenario indicated that the team and flight dynamics system were ready to fly the LADEE mission. Lunar Atmosphere and Dust Environment.

  7. Status of NASA In-Space Propulsion Technologies and Their Infusion Potential

    NASA Technical Reports Server (NTRS)

    Anderson, David; Pencil, Eric; Vento, Dan; Peterson, Todd; Dankanich, John; Hahne, David; Munk, Michelle

    2011-01-01

    Since 2001, the In-Space Propulsion Technology (ISPT) program has been developing in-space propulsion technologies that will enable or enhance NASA robotic science missions. These in-space propulsion technologies have broad applicability to future competed Discovery and New Frontiers mission solicitations, and are potentially enabling for future NASA flagship and sample return missions currently being considered. This paper provides status of the technology development of several in-space propulsion technologies that are ready for infusion into future missions. The technologies that are ready for flight infusion are: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies that will be ready for flight infusion in FY12/13 are 1) Advanced Xenon Flow Control System, and 2) ultra-lightweight propellant tank technology advancements and their infusion potential will be also discussed. The paper will also describe the ISPT project s future focus on propulsion for sample return missions: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) needed for sample return missions from many different destinations; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle-focused, and present a different set of technology infusion challenges. Systems/Mission Analysis focused on developing tools and assessing the application of propulsion technologies to a wide variety of mission concepts.

  8. Wet countdown demonstration and flight readiness firing

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The prelaunch tests for the Space Transportation System 1 flight are briefly described. Testing is divided into two major sections: the wet countdown demonstration test/flight readiness firing, which includes a 20 second test firing of the orbiter's three main engines, and a mission verification test, which is centered on flight and landing operations. The functions of the countdown sequence are listed and end of mission and mission abort exercises are described.

  9. Prototyping and implementing flight qualifiable semicustom CMOS P-well bulk integrated circuits in the JPL environment

    NASA Technical Reports Server (NTRS)

    Olson, E. M.

    1986-01-01

    Presently, there are many difficulties associated with implementing application specific custom or semi-custom (standard cell based) integrated circuits (ICs) into JPL flight projects. One of the primary difficulties is developing prototype semi-custom integrated circuits for use and evaluation in engineering prototype flight hardware. The prototype semi-custom ICs must be extremely cost-effective and yet still representative of flight qualifiable versions of the design. A second difficulty is encountered in the transport of the design from engineering prototype quality to flight quality. Normally, flight quality integrated circuits have stringent quality standards, must be radiation resistant and should consume minimal power. It is often not necessary or cost effective, however, to impose such stringent quality standards on engineering models developed for systems analysis in controlled lab environments. This article presents work originally initiated for ground based applications that also addresses these two problems. Furthermore, this article suggests a method that has been shown successful in prototyping flight quality semi-custom ICs through the Metal Oxide Semiconductor Implementation Service (MOSIS) program run by the University of Southern California's Information Sciences Institute. The method has been used successfully to design and fabricate through the MOSIS three different semi-custom prototype CMOS p-well chips. The three designs make use of the work presented and were designed consistent with design techniques and structures that are flight qualifiable, allowing one hour transfer of the design from engineering model status to flight qualifiable foundry-ready status through methods outlined in this article.

  10. Flight Rules Critical Readiness Review

    NASA Technical Reports Server (NTRS)

    Kim, E.; Knudsen, F.; Rice, S.

    2010-01-01

    The increment 23/24 Critical Readiness Review (CRR) flight rules are presented. The topics include: 1) B13-152 Acoustic Constraints; 2) B13-113 IFM/Corrective Action Prioritization Due to Loss of Exercise Capability; 3) B13-116 Constraints on Treadmill VIS Failure; 4) B13-201 Medical Management of ISS Fire/Smoke Response; 5) ARED and T2 Exercise constraints Flight rules (flight and stage specific); 6) FYI: B14 FR to be updated with requirement to sample crew sleep locations prior to receiving a "recommendation" from SRAG on where to sleep.

  11. JWST Wavefront Sensing and Control: Operations Plans, Demonstrations, and Status

    NASA Astrophysics Data System (ADS)

    Perrin, Marshall; Acton, D. Scott; Lajoie, Charles-Philippe; Knight, J. Scott; Myers, Carey; Stark, Chris; JWST Wavefront Sensing & Control Team

    2018-01-01

    After JWST launches and unfolds in space, its telescope optics will be aligned through a complex series of wavefront sensing and control (WFSC) steps to achieve diffraction-limited performance. This iterative process will comprise about half of the observatory commissioning time (~ 3 out of 6 months). We summarize the JWST WFSC process, schedule, and expectations for achieved performance, and discuss our team’s activities to prepare for an effective & efficient telescope commissioning. During the recently-completed OTIS cryo test at NASA JSC, WFSC demonstrations showed the flight-like operation of the entire JWST active optics and WFSC system from end to end, including all hardware and software components. In parallel, the same test data were processed through the JWST Mission Operations Center at STScI to demonstrate the readiness of ground system components there (such as the flight operations system, data pipelines, archives, etc). Moreover, using the Astronomer’s Proposal Tool (APT), the entire telescope commissioning program has been implemented, reviewed, and is ready for execution. Between now and launch our teams will continue preparations for JWST commissioning, including further rehearsals and testing, to ensure a successful alignment of JWST’s telescope optics.

  12. Design of the ARES Mars Airplane and Mission Architecture

    NASA Technical Reports Server (NTRS)

    Braun, Robert D.; Wright, Henry S.; Croom, Mark A.; Levine, Joel S.; Spencer, David A.

    2006-01-01

    Significant technology advances have enabled planetary aircraft to be considered as viable science platforms. Such systems fill a unique planetary science measurement gap, that of regional-scale, near-surface observation, while providing a fresh perspective for potential discovery. Recent efforts have produced mature mission and flight system concepts, ready for flight project implementation. This paper summarizes the development of a Mars airplane mission architecture that balances science, implementation risk and cost. Airplane mission performance, flight system design and technology maturation are described. The design, analysis and testing completed demonstrates the readiness of this science platform for use in a Mars flight project.

  13. Relationships between Readiness Characteristics and Basic Skills Achievement of Rural First Graders.

    ERIC Educational Resources Information Center

    Liu, Jeanne M.; Brinlee, Patricia S.

    The exploratory investigation was guided by four research questions: (1) what are the similarities and differences in the readiness status between rural and urban first graders; (2) what is the relationship between the readiness status and socioeconomic status of rural and urban first graders; (3) what are the similarities and differences in the…

  14. A Survey of Titan Balloon Concepts and Technology Status

    NASA Technical Reports Server (NTRS)

    Hall, Jeffery L.

    2011-01-01

    This paper surveys the options for, and technology status of, balloon vehicles to explore Saturn's moon Titan. A significant amount of Titan balloon concept thinking and technology development has been performed in recent years, particularly following the spectacular results from the descent and landing of the Huygens probe and remote sensing observations by the Cassini spacecraft. There is widespread recognition that a balloon vehicle on the next Titan mission could provide an outstanding and unmatched capability for in situ exploration on a global scale. The rich variety of revealed science targets has combined with a highly favorable Titan flight environment to yield a wide diversity of proposed balloon concepts. The paper presents a conceptual framework for thinking about balloon vehicle design choices and uses it to analyze various Titan options. The result is a list of recommended Titan balloon vehicle concepts that could perform a variety of science missions, along with their projected performance metrics. Recent technology developments for these balloon concepts are discussed to provide context for an assessment of outstanding risk areas and technological maturity. The paper concludes with suggestions for technology investments needed to achieve flight readiness.

  15. The application of decision analysis to life support research and technology development

    NASA Technical Reports Server (NTRS)

    Ballin, Mark G.

    1994-01-01

    Applied research and technology development is often characterized by uncertainty, risk, and significant delays before tangible returns are obtained. Decision making regarding which technologies to advance and what resources to devote to them is a challenging but essential task. In the application of life support technology to future manned space flight, new technology concepts typically are characterized by nonexistent data and rough approximations of technology performance, uncertain future flight program needs, and a complex, time-intensive process to develop technology to a flight-ready status. Decision analysis is a quantitative, logic-based discipline that imposes formalism and structure to complex problems. It also accounts for the limits of knowledge that may be available at the time a decision is needed. The utility of decision analysis to life support technology R & D was evaluated by applying it to two case studies. The methodology was found to provide insight that is not possible from more traditional analysis approaches.

  16. 30 cm Engineering Model thruster design and qualification tests

    NASA Technical Reports Server (NTRS)

    Schnelker, D. E.; Collett, C. R.

    1975-01-01

    Development of a 30-cm mercury electron bombardment Engineering Model ion thruster has successfully brought the thruster from the status of a laboratory experimental device to a point approaching flight readiness. This paper describes the development progress of the Engineering Model (EM) thruster in four areas: (1) design features and fabrication approaches, (2) performance verification and thruster to thruster variations, (3) structural integrity, and (4) interface definition. The design of major subassemblies, including the cathode-isolator-vaporizer (CIV), main isolator-vaporizer (MIV), neutralizer isolator-vaporizer (NIV), ion optical system, and discharge chamber/outer housing is discussed along with experimental results.

  17. EG&G Florida, Inc., KSC base operations contractor Launch Readiness Assessment System

    NASA Technical Reports Server (NTRS)

    Geaslen, W. D.

    1988-01-01

    A computerized Launch Readiness Assessment System (LRAS) which compares 'current status' of readiness against the 'required status' of readiness for the Space Shuttle. The five subsystems of the LRAS are examined in detail. The LRAS Plan specifies the overall system requirements, procedures, and reports. The LRAS Manager drives the operation of the LRAS system. The Responding Units (RU) maintain support plans and procedures which specify the detail requirements for each mission or milestone. The Master Data Tables contain the milestone, responsible RU relationships, and requirements assessment categories. The LRAS Status System serves as the launch readiness assessment reporting system. The relationships between these subsystems are displayed in diagrams.

  18. 32 CFR 813.7 - Readiness reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Readiness reporting. 813.7 Section 813.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE SALES AND SERVICES VISUAL... report readiness status through the SORTS process. See AFI 10-201, Status of Resources and Training...

  19. 32 CFR 813.7 - Readiness reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Readiness reporting. 813.7 Section 813.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE SALES AND SERVICES VISUAL... report readiness status through the SORTS process. See AFI 10-201, Status of Resources and Training...

  20. Aircraft Integration and Flight Testing of 4STAR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Flynn, CJ; Kassianov, E; Russell, P

    2012-10-12

    Under funding from the U.S. Dept. of Energy, in conjunction with a funded NASA 2008 ROSES proposal, with internal support from Battelle Pacific Northwest Division (PNWD), and in collaboration with NASA Ames Research Center, we successfully integrated the Spectrometer for Sky-Scanning, Sun-Tracking Atmospheric Research (4STAR-Air) instrument for flight operation aboard Battelle’s G-1 aircraft and conducted a series of airborne and ground-based intensive measurement campaigns (hereafter referred to as “intensives”) for the purpose of maturing the initial 4STAR-Ground prototype to a flight-ready science-ready configuration.

  1. Flight demonstration of a self repairing flight control system in a NASA F-15 fighter aircraft

    NASA Technical Reports Server (NTRS)

    Urnes, James M.; Stewart, James; Eslinger, Robert

    1990-01-01

    Battle damage causing loss of control capability can compromise mission objectives and even result in aircraft loss. The Self Repairing Flight Control System (SRFCS) flight development program directly addresses this issue with a flight control system design that measures the damage and immediately refines the control system commands to preserve mission potential. The system diagnostics process detects in flight the type of faults that are difficult to isolate post flight, and thus cause excessive ground maintenance time and cost. The control systems of fighter aircraft have the control power and surface displacement to maneuver the aircraft in a very large flight envelope with a wide variation in airspeed and g maneuvering conditions, with surplus force capacity available from each control surface. Digital flight control processors are designed to include built-in status of the control system components, as well as sensor information on aircraft control maneuver commands and response. In the event of failure or loss of a control surface, the SRFCS utilizes this capability to reconfigure control commands to the remaining control surfaces, thus preserving maneuvering response. Correct post-flight repair is the key to low maintainability support costs and high aircraft mission readiness. The SRFCS utilizes the large data base available with digital flight control systems to diagnose faults. Built-in-test data and sensor data are used as inputs to an Onboard Expert System process to accurately identify failed components for post-flight maintenance action. This diagnostic technique has the advantage of functioning during flight, and so is especially useful in identifying intermittent faults that are present only during maneuver g loads or high hydraulic flow requirements. A flight system was developed to test the reconfiguration and onboard maintenance diagnostics concepts on a NASA F-15 fighter aircraft.

  2. Recent Status of SIM Lite Astrometric Observatory Mission: Flight Engineering Risk Reduction Activities

    NASA Technical Reports Server (NTRS)

    Goullioud, Renaud; Dekens, Frank; Nemati, Bijan; An, Xin; Carson, Johnathan

    2010-01-01

    The SIM Lite Astrometric Observatory is a mission concept for a space-borne instrument to perform micro-arc-second narrow-angle astrometry to search 60 to 100 nearby stars for Earth-like planets, and to perform global astrometry for a broad astrophysics program. The instrument consists of two Michelson stellar interferometers and a telescope. The first interferometer chops between the target star and a set of reference stars. The second interferometer monitors the attitude of the instrument in the direction of the target star. The telescope monitors the attitude of the instrument in the other two directions. The main enabling technology development for the mission was completed during phases A & B. The project is currently implementing the developed technology onto flight-ready engineering models. These key engineering tasks will significantly reduce the implementation risks during the flight phases C & D of the mission. The main optical interferometer components, including the astrometric beam combiner, the fine steering optical mechanism, the path-length-control and modulation optical mechanisms, focal-plane camera electronics and cooling heat pipe, are currently under development. Main assemblies are built to meet flight requirements and will be subjected to flight qualification level environmental testing (random vibration and thermal cycling) and performance testing. This paper summarizes recent progress in engineering risk reduction activities.

  3. Status of shuttle fuel cell technology program.

    NASA Technical Reports Server (NTRS)

    Rice, W. E.; Bell, D., III

    1972-01-01

    The hydrogen-oxygen fuel cell has been proved as an efficient and reliable electrical power supply for NASA manned-space-flight vehicles. It has thus ensured a role in the Space Shuttle Program as the primary electrical power supply for the Orbiter vehicle. The advanced fuel cell technology programs conducted under the management of the NASA Manned Spacecraft Center over the past two years have resulted in a high level of technical readiness in fuel cell power generation to support shuttle mission requirements. These programs have taken advantage of technological developments that have occurred since the designs were completed for the Gemini and Apollo fuel cells.

  4. Status of NASA's Space Launch System

    NASA Technical Reports Server (NTRS)

    Honeycutt, John; Lyles, Garry

    2016-01-01

    NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

  5. Hardware Photos: Image Showing JWST Engineering Demonstration Mirror, Mounted Ready for Machining at AXYS and Image Showing HIP Can Containing Light Mirrors 1 and 2 Ready for Mirror Fabrication

    NASA Technical Reports Server (NTRS)

    OKeefe, Sean

    2004-01-01

    The images in this viewgraph presentation have the following captions: 1) EDU mirror after being sawed in half; 2) EDU Delivered to Axsys; 3) Be EDU Blank Received and Machining Started; 4) Loaded HIP can for flight PM segments 1 and 2; 5) Flight Blanks 1 and 2 Loaded into HIP Can at Brush-Wellman; 6) EDU in Machining at Axsys.

  6. Using Ready-To Drone Images in Forestry Activities: Case Study of ÇINARPINAR in Kahramanmaras, Turkey

    NASA Astrophysics Data System (ADS)

    Gülci, S.; Akgül, M.; Akay, A. E.; Taş, İ.

    2017-11-01

    This short paper aims to present pros and cons of current usage of ready-to-use drone images in the field of forestry also considering flight planning and photogrammetric processes. The capabilities of DJI Phantom 4, which is the low cost drone producing by Dji company, was evaluated through sample flights in Cinarpinar Forest Enterprise Chief in Kahramanmaras in Turkey. In addition, the photogrammetric workflow of obtained images and automated flight were presented with respect to capabilities of available software. The flight plans were created by using Pix4DCapture software with android based cell phone. The results indicated that high-resolution imagery obtained by drone can provide significant data for assessment of forest resources, forest roads, and stream channels.

  7. Technology review of flight crucial flight control systems (application of optical technology)

    NASA Technical Reports Server (NTRS)

    Rediess, H. A.; Buckley, E. C.

    1984-01-01

    The survey covers the various optical elements that are considered in a fly-by-light flight control system including optical sensors and transducers, optical data links, so-called optical actuators, and optical/electro-optical processing. It also addresses airframe installation, maintenance, and repair issues. Rather than an in-depth treatment of optical technology, the survey concentrates on technology readiness and the potential advantages/disadvantages of applying the technology. The information was assembled from open literature, personal interviews, and responses to a questionnaire distributed specifically for this survey. Not all of the information obtained was consistent, particularly with respect to technology readiness. The synthesis of information into the perception of the state-of-technology is presented.

  8. KSC-2009-5862

    NASA Image and Video Library

    2009-10-23

    CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Bob Ess, NASA's mission manager for the Ares I-X flight test, participates in a news conference following the conclusion of the flight test readiness review, or FTRR, for the Ares I-X test rocket. During the meeting, senior NASA and contractor managers assessed the risks associated with the test and determined the rocket, support systems and procedures are ready for launch. The Ares I-X launch date was announced after the FTRR and is officially set for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Jack Pfaller

  9. Assessing fitness-for-duty and predicting performance with cognitive neurophysiological measures

    NASA Astrophysics Data System (ADS)

    Smith, Michael E.; Gevins, Alan

    2005-05-01

    Progress is described in developing a novel test of neurocognitive status for fitness-for-duty testing. The Sustained Attention & Memory (SAM) test combines neurophysiologic (EEG) measures of brain activation with performance measures during a psychometric test of sustained attention and working memory, and then gauges changes in neurocognitive status relative to an individual"s normative baseline. In studies of the effects of common psychoactive substances that can affect job performance, including sedating antihistamines, caffeine, alcohol, marijuana, and prescription medications, test sensitivity was greater for the combined neurophysiological and performance measures than for task performance measures by themselves. The neurocognitive effects of overnight sleep deprivation were quite evident, and such effects predicted subsequent performance impairment on a flight simulator task. Sensitivity to diurnal circadian variations was also demonstrated. With further refinement and independent validation, the SAM Test may prove useful for assessing readiness-to-perform in high-asset personnel working in demanding, high risk situations.

  10. Subjective social status and readiness to quit among homeless smokers.

    PubMed

    Garey, Lorra; Reitzel, Lorraine R; Bakhshaie, Jafar; Kendzor, Darla E; Zvolensky, Michael J; Businelle, Michael S

    2015-03-01

    To explore the predictive value of subjective social status (SSS-US and SSS-Community) on readiness to quit among 245 homeless smokers. Hierarchical multiple regression analyses were conducted (stratified by sex). Higher SSS-US (p = .02) and SSS-Community (p < .001) predicted greater readiness to quit in the total sample. These relationships upheld for men (p's <. 01), but only SSS-Community predicted readiness to quit for women (p = .02). Higher SSS is associated with greater readiness to quit among homeless smokers. SSS-Community may be a more relevant index of SSS for women relative to SSS-US. Results suggest SSS may be a factor that contributes to smoking, disease, and health disparities.

  11. Preparing GMAT for Operational Maneuver Planning of the Advanced Composition Explorer (ACE)

    NASA Technical Reports Server (NTRS)

    Qureshi, Rizwan Hamid; Hughes, Steven P.

    2014-01-01

    The General Mission Analysis Tool (GMAT) is an open-source space mission design, analysis and trajectory optimization tool. GMAT is developed by a team of NASA, private industry, public and private contributors. GMAT is designed to model, optimize and estimate spacecraft trajectories in flight regimes ranging from low Earth orbit to lunar applications, interplanetary trajectories and other deep space missions. GMAT has also been flight qualified to support operational maneuver planning for the Advanced Composition Explorer (ACE) mission. ACE was launched in August, 1997 and is orbiting the Sun-Earth L1 libration point. The primary science objective of ACE is to study the composition of both the solar wind and the galactic cosmic rays. Operational orbit determination, maneuver operations and product generation for ACE are conducted by NASA Goddard Space Flight Center (GSFC) Flight Dynamics Facility (FDF). This paper discusses the entire engineering lifecycle and major operational certification milestones that GMAT successfully completed to obtain operational certification for the ACE mission. Operational certification milestones such as gathering of the requirements for ACE operational maneuver planning, gap analysis, test plans and procedures development, system design, pre-shadow operations, training to FDF ACE maneuver planners, shadow operations, Test Readiness Review (TRR) and finally Operational Readiness Review (ORR) are discussed. These efforts have demonstrated that GMAT is flight quality software ready to support ACE mission operations in the FDF.

  12. 14 CFR 417.117 - Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... information: (i) Readiness of launch vehicle and payload. (ii) Readiness of any flight safety system and... of a launch safety review must ensure satisfaction of the following criteria: (i) A launch operator... operator must resolve all safety related action items. (ii) A launch operator must assign and certify...

  13. Status of NASA's Space Launch System

    NASA Technical Reports Server (NTRS)

    Honeycutt, John; Cook, Jerry; Lyles, Garry

    2016-01-01

    NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

  14. Status of NASA's Space Launch System

    NASA Technical Reports Server (NTRS)

    Lyles, Garry

    2016-01-01

    NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

  15. KSC-2009-1800

    NASA Image and Video Library

    2009-02-20

    CAPE CANAVERAL, Fla. – Mike Curie (far left), with NASA Public Affairs, moderates the flight readiness review news conference for space shuttle Discovery's STS-119 mission. On the panel are (from left) Associate Administrator for Space Operations Bill Gerstenmaier, Space Shuttle Program Manager John Shannon and Space Shuttle Launch Director Mike Leinbach. During a thorough review of Discovery's readiness for flight, NASA managers decided Feb. 20 more data and possible testing are required before proceeding to launch. Engineering teams have been working to identify what caused damage to a flow control valve on shuttle Endeavour during its November 2008 flight. A new launch date has not been determined. NASA managers decided Feb. 20 more data and possible testing are required before proceeding to launch. Engineering teams have been working to identify what caused damage to a flow control valve on shuttle Endeavour during its November 2008 flight. A new launch date has not been determined. Photo credit: NASA/Glenn Benson

  16. 14 CFR 417.117 - Reviews.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... hours of flight. A person, identified as required by § 417.103(b)(1), must review all preflight testing... personnel and the results of flight safety system testing. (iii) Readiness of safety-related launch property... conduct a launch safety review no later than 15 days before the planned day of flight, or as agreed to by...

  17. 14 CFR 417.117 - Reviews.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... hours of flight. A person, identified as required by § 417.103(b)(1), must review all preflight testing... personnel and the results of flight safety system testing. (iii) Readiness of safety-related launch property... conduct a launch safety review no later than 15 days before the planned day of flight, or as agreed to by...

  18. 14 CFR 417.117 - Reviews.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hours of flight. A person, identified as required by § 417.103(b)(1), must review all preflight testing... personnel and the results of flight safety system testing. (iii) Readiness of safety-related launch property... conduct a launch safety review no later than 15 days before the planned day of flight, or as agreed to by...

  19. Assessing infant and maternal readiness for newborn discharge.

    PubMed

    Jing, Ling; Bethancourt, Casidhe-Nicole; McDonagh, Thomas

    2017-10-01

    The review highlights the shift from prescribed length of stay (LOS) to mother-infant dyad readiness as the basis for making discharge decisions for healthy term newborns. We describe the components of readiness that should be considered in making the decision, focusing on infant clinical readiness, and maternal and familial readiness. Although the Newborns' and Mothers' Health Protection Act of 1996 aimed to protect infants and mothers by establishing a minimum LOS, the American Academy of Pediatrics 2015 policy on newborn discharge acknowledges the shift from LOS-based to readiness-based discharge decision-making. Healthcare providers must consider a variety of infant and maternal characteristics in determining the appropriate time to discharge a dyad, and mothers should be actively involved in the decision-making process. Criteria for infant clinical readiness include the following: establishment of effective feeding, evaluation of jaundice risk, review and discussion of infant and household vaccination status, obtainment of specimen for metabolic screening, tests of hearing ability, assessment of sepsis risk factors, screening for congenital heart disease, and evaluation of parental knowledge about infant safety measures. Important consideration should also be given to the mother's sociodemographic vulnerabilities, maternal confidence and perception of discharge readiness, and availability of postdischarge care continuity. The timing of newborn discharge should be a joint decision made by the mother and healthcare providers based on readiness. The decision should consider the infant's health status, the mother's health status, the mother's perception of readiness, and the availability of social and familial support for the mother and infant. Accessible and comprehensive support postdischarge is also important for helping infants achieve optimal health outcomes.

  20. The Integration and Test Program of the James Webb Space Telescope

    NASA Technical Reports Server (NTRS)

    Kimble, Randy

    2012-01-01

    The James Webb Space Telescope (JWST) project has entered into a comprehensive integration and test (I&T) program that over the coming years will assemble the various elements of the observatory (the Optical Telescope Element [OTE], the Integrated Science Instrument Module [ISIM], and the Spacecraft) and verify the readiness of the integrated system for launch. The I&T program as replanned for a 2018 launch readiness date has a number of interesting features. These include a streamlined ISIM cryo-vacuum test program at Goddard Space Flight Center, a streamlined OTIS (OTE + ISIM) test program at Johnson Space Center (JSC), the addition of a second Core cryo-vacuum thermal test, the enhancement of the Pathfinder program at JSC, and enhancement of the subsystem-level testing program for the MIRI cryo-cooler. These latter activities all serve to reduce the risk heading into the end-to-end optical and thermal testing of the telescope at JSC, leading to reduced cost and schedule risk for that critical activity. We report here on the overall I&T program for JWST and on the status of the hardware and plans that support it.

  1. 27. Photographic copy of original construction drawing, dated May 22, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photographic copy of original construction drawing, dated May 22, 1951 (from paper copy at Engineering Flight, Ellsworth Air Force Base, SD). Readiness hangar architectural: plan at clerestory & elevation. - Ellsworth Air Force Base, Readiness Hangar, Kenny Road, southeast corner of interstction with G Avenue, Blackhawk, Meade County, SD

  2. The Status of Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric; Dankanich, John; Glaab, Louis; Peterson, Todd

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System and ultralightweight propellant tank technologies. Future directions for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV); and 3) electric propulsion. These technologies are more vehicles and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These inspace propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  3. The status of spacecraft bus and platform technology development under the NASA ISPT program

    NASA Astrophysics Data System (ADS)

    Anderson, D. J.; Munk, M. M.; Pencil, E.; Dankanich, J.; Glaab, L.; Peterson, T.

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN& C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System and ultra-lightweight propellant tank technologies. Future directions for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV); and 3) electric propulsion. These technologies are more vehicles and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicabilit- to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  4. The Status of Spacecraft Bus and Platform Technology Development Under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric J.; Dankanich, John; Glaab, Louis J.

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance 2) NASAs Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV) 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) and 3) electric propulsion. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  5. Parenting, Race, and Socioeconomic Status: Links to School Readiness

    ERIC Educational Resources Information Center

    Dotterer, Aryn M.; Iruka, Iheoma U.; Pungello, Elizabeth

    2012-01-01

    This study examined the link between socioeconomic status (SES) and school readiness, testing whether parenting (maternal sensitivity and negative behavior/intrusiveness) and financial stress mediated this association and if race moderated these paths. Participants included 164 mother-child dyads from African American and European American…

  6. Trailblazer 1B Flight Preparations

    NASA Image and Video Library

    1959-06-04

    L59-3896 Engineers W. N. Gardner and C.A. Brown, Jr., check operations as Trailblazer 1b is readied for Flight, June 4, 1959. Photograph published in A New Dimension Wallops Island Flight Test Range: The First Fifteen Years by Joseph Shortal. A NASA publication, page 675. D58-3001 Model. Engineers W. N. Gardner and C.A. Brown

  7. NASA In-Space Propulsion Technologies and Their Infusion Potential

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Pencil,Eric J.; Peterson, Todd; Vento, Daniel; Munk, Michelle M.; Glaab, Louis J.; Dankanich, John W.

    2012-01-01

    The In-Space Propulsion Technology (ISPT) program has been developing in-space propulsion technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (Electric and Chemical), Entry Vehicle Technologies (Aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies that will be ready for flight infusion in the near future will be Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future focuses for ISPT are sample return missions and other spacecraft bus technologies like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle-focused, and present a different set of technology infusion challenges. While the Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  8. Aerocapture, Entry, Descent and Landing (AEDL) Human Planetary Landing Systems. Section 10: AEDL Analysis, Test and Validation Infrastructure

    NASA Technical Reports Server (NTRS)

    Arnold, J.; Cheatwood, N.; Powell, D.; Wolf, A.; Guensey, C.; Rivellini, T.; Venkatapathy, E.; Beard, T.; Beutter, B.; Laub, B.

    2005-01-01

    Contents include the following: 3 Listing of critical capabilities (knowledge, procedures, training, facilities) and metrics for validating that they are mission ready. Examples of critical capabilities and validation metrics: ground test and simulations. Flight testing to prove capabilities are mission ready. Issues and recommendations.

  9. Expedition Five crew is ready to leave KSC for Houston

    NASA Technical Reports Server (NTRS)

    2002-01-01

    KENNEDY SPACE CENTER, FLA. -- The Expedition Five crew are ready to leave KSC for Houston. From left are Science Officer Peggy Whitson, Commander Valery Korzun and Flight Engineer Sergei Treschev. The three returned to Earth on Endeavour Dec. 7, with the STS-113 crew, after six months on the International Space Station.

  10. Multiple Payload Ejector for Education, Science and Technology Experiments

    NASA Technical Reports Server (NTRS)

    Lechworth, Gary

    2005-01-01

    The education research community no longer has a means of being manifested on Space Shuttle flights, and small orbital payload carriers must be flown as secondary payloads on ELV flights, as their launch schedule, secondary payload volume and mass permits. This has resulted in a backlog of small payloads, schedule and cost problems, and an inability for the small payloads community to achieve routine, low-cost access to orbit. This paper will discuss Goddard's Wallops Flight Facility funded effort to leverage its core competencies in small payloads, sounding rockets, balloons and range services to develop a low cost, multiple payload ejector (MPE) carrier for orbital experiments. The goal of the MPE is to provide a low-cost carrier intended primarily for educational flight research experiments. MPE can also be used by academia and industry for science, technology development and Exploration experiments. The MPE carrier will take advantage of the DARPAI NASA partnership to perform flight testing of DARPA s Falcon small, demonstration launch vehicle. The Falcon is similar to MPE fiom the standpoint of focusing on a low-cost, responsive system. Therefore, MPE and Falcon complement each other for the desired long-term goal of providing the small payloads community with a low-cost ride to orbit. The readiness dates of Falcon and MPE are complementary, also. MPE is being developed and readied for flight within 18 months by a small design team. Currently, MPE is preparing for Critical Design Review in fall 2005, payloads are being manifested on the first mission, and the carrier will be ready for flight on the first Falcon demonstration flight in summer, 2006. The MPE and attached experiments can weigh up to 900 lb. to be compatible with Falcon demonstration vehicle lift capabilities fiom Wallops, and will be delivered to the Falcon demonstration orbit - 100 nautical mile circular altitude.

  11. Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Gomez-Rosa, Carlos; Cifuentes, Juan; Wasiak, Francis; Alfonzo, Agustin

    2015-01-01

    The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key milestone for predicting and ensuring on-orbit success.

  12. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  13. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  14. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  15. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  16. Neighbourhood ethnic diversity buffers school readiness impact in ESL children.

    PubMed

    Puchala, Chassidy; Vu, Lan T H; Muhajarine, Nazeem

    2010-01-01

    Contextual factors, as measured by neighbourhood characteristics, shape the experiences children have and affect their "school readiness", i.e., whether they are well or poorly prepared for the transition from home to kindergarten. This study assessed the independent effects of individual and neighbourhood factors on school readiness; specifically, it examined whether and to what degree neighbourhood factors modified children's language ability and thus their school readiness in a population of children in Saskatoon, Saskatchewan. The study included all children attending kindergarten in 2001, 2003 and 2005 in Saskatoon. School readiness and child characteristics were measured by the Early Development Instrument (EDI). The EDI measures child development at school commencement in five domains: physical health and well-being, social competence, emotional maturity, cognitive and language development, and communication skills and general knowledge. Data from the 2001 Census were used to characterize Saskatoon's neighbourhoods. Multilevel modeling examined the independent and buffering or exacerbating effects of individual and neighbourhood factors on the relation between English as a Second Language (ESL) status in children and EDI domain scores. ESL children had significantly lower scores on all EDI domains compared with non-ESL children. Certain factors (e.g., younger age, male, Aboriginal status, having special needs) were significantly related to lower readiness in terms of the emotional maturity, and communication skills and general knowledge domains. Importantly, children who lived in neighbourhoods that were highly transient (with a higher proportion of residents who had moved in the previous year) had lower EDI scores on both domains, and those in neighbourhoods with lower rates of employment had lower EDI scores on communication skills and general knowledge. Neighbourhood ethnic diversity mitigated the negative impact of ESL status on school readiness for both domains. ESL children from neighbourhoods with a high degree of ethnic diversity had higher EDI scores than ESL children from neighbourhoods with low ethnic diversity. The current study provided insight regarding the impact of contextual factors in addition to individual factors, such as ESL status, on school readiness outcomes. Future research should continue to examine contextual factors related to ESL status and early child developmental outcomes, particularly focusing on the mechanisms of influence.

  17. Implementation strategies for load center automation on the space station module/power management and distribution testbed

    NASA Technical Reports Server (NTRS)

    Watson, Karen

    1990-01-01

    The Space Station Module/Power Management and Distribution (SSM/PMAD) testbed was developed to study the tertiary power management on modules in large spacecraft. The main goal was to study automation techniques, not necessarily develop flight ready systems. Because of the confidence gained in many of automation strategies investigated, it is appropriate to study, in more detail, implementation strategies in order to find better trade-offs for nearer to flight ready systems. These trade-offs particularly concern the weight, volume, power consumption, and performance of the automation system. These systems, in their present implementation are described.

  18. Challenging Technology, and Technology Infusion into 21st Century

    NASA Technical Reports Server (NTRS)

    Chau, S. N.; Hunter, D. J.

    2001-01-01

    In preparing for the space exploration challenges of the next century, the National Aeronautics and Space Administration (NASA) Center for Integrated Space Micro-Systems (CISM) is chartered to develop advanced spacecraft systems that can be adapted for a large spectrum of future space missions. Enabling this task are revolutions in the miniaturization of electrical, mechanical, and computational functions. On the other hand, these revolutionary technologies usually have much lower readiness levels than those required by flight projects. The mission of the Advanced Micro Spacecraft (AMS) task in CISM is to bridge the readiness gap between advanced technologies and flight projects. Additional information is contained in the original extended abstract.

  19. EC97-44354-1

    NASA Image and Video Library

    1997-12-16

    The F-16XL #1 (NASA 849) takes off for the first flight of the Digital Flight Control System (DFCS) on December 16, 1997. Like most first flight, the DFCS required months of preparations. During July 1997, crews worked on the engine, cockpit, canopy, seat, and instrumentation. By late August, the aircraft began combined systems tests and a flight readiness review. Although the Air Force Safety Review Board (AFSRB)- a group that provided double checks on all flight operations - approved the program in late November 1997, a problem with the aircraft flight computer delayed the functional check flight until mid-December.

  20. Get Ready To Fly.

    ERIC Educational Resources Information Center

    Janes, Patricia

    2001-01-01

    Presents suggestions to help students learn about the concept of flight. Ideas include making a classroom timeline of flight, creating balloon rockets to demonstrate the concept of thrust, making tissue paper parachutes and observing the effect of drag, designing a space mission patch, and having a model paper airplane competition. (SM)

  1. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  2. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  3. NASA Technology Demonstrations Missions Program Overview

    NASA Technical Reports Server (NTRS)

    Turner, Susan

    2011-01-01

    The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry, more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.

  4. Technology Readiness of the NEXT Ion Propulsion System

    NASA Technical Reports Server (NTRS)

    Benson, Scott W.; Patterson, Michael J.

    2008-01-01

    The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including: a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development. The next round of competed planetary science mission announcements of opportunity, and directed mission decisions, are anticipated to occur in 2008 and 2009. Progress to date, and the success of on-going technology validation, indicate that the NEXT ion propulsion system will be a primary candidate for mission consideration in these upcoming opportunities.

  5. DOD Financial Management: Significant Efforts Still Needed for Remediating Audit Readiness Deficiencies

    DTIC Science & Technology

    2017-02-01

    19As defined in generally accepted government auditing standards, information technology controls...Financial Improvement and Audit Readiness (FIAR) Plan Status Report, while DOD continues to make progress in addressing information technology ...DOD FINANCIAL MANAGEMENT Significant Efforts Still Needed for Remediating Audit Readiness Deficiencies Report to

  6. Socioeconomic Status, Higher-Level Mathematics Courses, Absenteeism, and Student Mobility as Indicators of Work Readiness

    ERIC Educational Resources Information Center

    Folds, Lea D.; Tanner, C. Kenneth

    2014-01-01

    The purpose of this study was to analyze the relations among socioeconomic status, highest-level mathematics course, absenteeism, student mobility and measures of work readiness of high school seniors in Georgia. Study participants were 476 high school seniors in one Georgia county. The full regression model explained 27.5% of the variance in…

  7. Implementation of Insight Responsibilities in Process Engineering

    NASA Technical Reports Server (NTRS)

    Osborne, Deborah M.

    1997-01-01

    This report describes an approach for evaluating flight readiness (COFR) and contractor performance evaluation (award fee) as part of the insight role of NASA Process Engineering at Kennedy Space Center. Several evaluation methods are presented, including systems engineering evaluations and use of systems performance data. The transition from an oversight function to the insight function is described. The types of analytical tools appropriate for achieving the flight readiness and contractor performance evaluation goals are described and examples are provided. Special emphasis is placed upon short and small run statistical quality control techniques. Training requirements for system engineers are delineated. The approach described herein would be equally appropriate in other directorates at Kennedy Space Center.

  8. KSC-2009-2012

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold signals he is ready for launch during the final fitting of his launch and entry suit. Arnold is making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  9. Nuclear thermal propulsion workshop overview

    NASA Technical Reports Server (NTRS)

    Clark, John S.

    1991-01-01

    NASA is planning an Exploration Technology Program as part of the Space Exploration Initiative to return U.S. astronauts to the moon, conduct intensive robotic exploration of the moon and Mars, and to conduct a piloted mission to Mars by 2019. Nuclear Propulsion is one of the key technology thrust for the human mission to Mars. The workshop addresses NTP (Nuclear Thermal Rocket) technologies with purpose to: assess the state-of-the-art of nuclear propulsion concepts; assess the potential benefits of the concepts for the mission to Mars; identify critical, enabling technologies; lay-out (first order) technology development plans including facility requirements; and estimate the cost of developing these technologies to flight-ready status. The output from the workshop will serve as a data base for nuclear propulsion project planning.

  10. EVA tools and equipment reference book

    NASA Technical Reports Server (NTRS)

    Fullerton, R. K.

    1993-01-01

    This document contains a mixture of tools and equipment used throughout the space shuttle-based extravehicular activity (EVA) program. Promising items which have reached the prototype stage of development are also included, but should not be considered certified ready for flight. Each item is described with a photo, a written discussion, technical specifications, dimensional drawings, and points of contact for additional information. Numbers on the upper left-hand corner of each photo may be used to order specific pictures from NASA and contractor photo libraries. Points of contact were classified as either operational or technical. An operational contact is an engineer from JSC Mission Operations Directorate who is familiar with the basic function and on-orbit use of the tool. A technical contact would be the best source of detailed technical specifications and is typically the NASA subsystem manager. The technical information table for each item uses the following terms to describe the availability or status of each hardware item: Standard - Flown on every mission as standard manifest; Flight specific - Potentially available for flight, not flown every mission (flight certification cannot be guaranteed and recertification may be required); Reference only - Item no longer in active inventory or not recommended for future use, some items may be too application-specific for general use; and Developmental - In the prototype stage only and not yet available for flight. The current availability and certification of any flight-specific tool should be verified with the technical point of contact. Those tools built and fit checked for Hubble Space Telescope maintenance are program dedicated and are not available to other customers. Other customers may have identical tools built from the existing, already certified designs as an optional service.

  11. Dr. Robert Goddard

    NASA Image and Video Library

    2017-12-08

    Dr. Robert Goddard's rocket ready for flight. Roswell, New Mexico. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Join us on Facebook

  12. First AFSWC Javelin Sounding Rocket On Launcher at Wallops Island.

    NASA Image and Video Library

    1959-07-07

    Air Force Javelin Rocket on Launcher (USAF JV-1) Wallops Model D4-78 L59-5144 First AFSWC Javelin sounding rocket ready for flight test, July 7, 1959. Photograph published in A New Dimension Wallops Island Flight Test Range: The First Fifteen Years by Joseph Shortal. A NASA publication. Page 704.

  13. MSFC Technology Year in Review 2015

    NASA Technical Reports Server (NTRS)

    Reynolds, David; Tinker, Mike

    2015-01-01

    MSFC has a strong diverse portfolio of technology development projects, ranging from flight projects to very low Technology Readiness Level (TRL) laboratory projects. The 2015 Year in Review highlights the Center's technology projects and celebrates their accomplishments to raise awareness of technology development work that is integral to the success of future Agency flight programs.

  14. Communication satellites for STS-5 being readied for loading

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Two commercial communication satellites scheduled for flight on STS-5 are pictured as they are being readied for loading into a special canister that will transport them to the launch pad. Telsat Canada's Anik C-3 (at bottom) is seen in its blanket covered cradle assemble. Satellite Business System's SBS-3 is at top. This photo was taken inside the vertical processing facility (VPF).

  15. StormReady in a Box: Enhancing NOAA's Presence in Schools

    NASA Astrophysics Data System (ADS)

    Grondin, N. S.; Franks, C.

    2015-12-01

    The National Weather Service StormReady Supporter program exists to give schools, companies, TV stations, and other facilities the opportunity to earn recognition for their weather preparedness and awareness. Requirements to earn StormReady Supporter status include having a facility warning point, use of NOAA Weather Radios, and weather hazard Emergency Operation Plans. Despite the increasing importance of weather preparedness in schools, only 1.2% of Minnesota schools are deemed StormReady by the National Weather Service. It was determined that the major impedance for schools becoming StormReady Supporters is the lack of time for administrators to engage in anything "extra" beyond their listed duties. As part of a 2015 Hollings Scholar project, the StormReady in a Box concept was developed to remedy this, by empowering teachers and students to take charge and complete the StormReady Supporter application for their school. StormReady in a Box is a project developed for Junior High School students to learn about weather preparedness and to help their school acquire StormReady status. The project was designed to be relevant to the Minnesota State Education Standards in Science, be simple for teachers to do with their students, and most importantly, to be enjoyable for Junior High School age students to do. The project was also designed to enhance critical thinking skills and logical reasoning abilities, as they relate to the StormReady Supporter application. This presentation will present the overall rationale for the undertaking of this project, the creation of, and the logical next steps for the StormReady in a Box project.

  16. Logistics and Maintenance Options to Support the P-8A Poseidon’s Expeditionary Mission

    DTIC Science & Technology

    2010-06-01

    Equipment HOA Horn Of Africa ICD Initial Capabilities Document IFR In Flight Refueling ISR Intelligence Surveillance and Reconnaissance JOA...will transition to the new MPRF platform 18 one base and one squadron at a time beginning with the Fleet Readiness Squadron ( FRS ) and VP squadrons...and is equipped with in a universal aerial refueling receptacle that will provide In-Flight Refueling ( IFR ) capability. This new in-flight

  17. Ensuring Success of Adaptive Control Research Through Project Lifecycle Risk Mitigation

    NASA Technical Reports Server (NTRS)

    Pavlock, Kate M.

    2011-01-01

    Lessons Learne: 1. Design-out unnecessary risk to prevent excessive mitigation management during flight. 2. Consider iterative checkouts to confirm or improve human factor characteristics. 3. Consider the total flight test profile to uncover unanticipated human-algorithm interactions. 4. Consider test card cadence as a metric to assess test readiness. 5. Full-scale flight test is critical to development, maturation, and acceptance of adaptive control laws for operational use.

  18. Orion flight test previewed on This Week @NASA - November 7, 2014

    NASA Image and Video Library

    2014-11-07

    A NASA media briefing on Nov. 6 at Kennedy Space Center highlighted the fully assembled Orion spacecraft and details of its first test flight, scheduled for Dec. 4. The 4 and-a-half hour flight, called Exploration Flight Test-1, will send Orion 3,600 miles from Earth on a two-orbit flight to confirm its critical systems are ready for the challenges of eventually sending astronauts on deep space missions to an asteroid and Mars. Also, Delta IV Heavy wet dress test, Next ISS crew trains, Space agency leaders support ISS, Curiosity confirms orbital data and more!

  19. Assessing Tactical Scheduler Options for Time-Based Surface Metering

    NASA Technical Reports Server (NTRS)

    Zelinski, Shannon; Windhorst, Robert

    2017-01-01

    NASA is committed to demonstrating a concept of integrated arrival, departure, and surface operations by 2020 under the Airspace Technology Demonstration 2 (ATD2) sub-project. This will be accomplished starting with a demonstration of flight specific time-based departure metering at Charlotte Douglass International Airport (CLT). ATD2 tactical metering capability is based on NASAs Spot And Runway Departure Advisor (SARDA) which has been tested successfully in human-in-the-loop simulations of CLT. SARDA makes use of surface surveillance data and surface modeling to estimate the earliest takeoff time for each flight active on the airport surface or ready for pushback from the gate. The system then schedules each flight to its assigned runway in order of earliest takeoff time and assigns a target pushback time, displayed to ramp controllers as an advisory gate hold time. The objective of this method of departure metering is to move as much delay as possible to the gate to minimize surface congestion and engine on-time, while keeping sufficient pressure on the runway to maintain throughput. This flight specific approached enables greater flight efficiency and predictability, facilitating trajectory-based operations and surface-airspace integration, which ATD2 aims to achieve.Throughout ATD2 project formulation and system development, researchers have continuously engaged with stakeholders and future users, uncovering key system requirements for tactical metering that SARDA did not address. The SARDA scheduler is updated every 10 seconds using real-time surface surveillance data to ensure the most up-to-date information is used to predict runway usage. However, rapid updates also open the potential for fluctuating advisories, which Ramp controllers at a busy airport like CLT find unacceptable. Therefore, ATD2 tactical metering requires that all advisories freeze once flights are ready so that Ramp controllers may communicate a single hold time when responding to pilot ready calls.

  20. Propellant Readiness Level: A Methodological Approach to Propellant Characterization

    NASA Technical Reports Server (NTRS)

    Bossard, John A.; Rhys, Noah O.

    2010-01-01

    A methodological approach to defining propellant characterization is presented. The method is based on the well-established Technology Readiness Level nomenclature. This approach establishes the Propellant Readiness Level as a metric for ascertaining the readiness of a propellant or a propellant combination by evaluating the following set of propellant characteristics: thermodynamic data, toxicity, applications, combustion data, heat transfer data, material compatibility, analytical prediction modeling, injector/chamber geometry, pressurization, ignition, combustion stability, system storability, qualification testing, and flight capability. The methodology is meant to be applicable to all propellants or propellant combinations; liquid, solid, and gaseous propellants as well as monopropellants and propellant combinations are equally served. The functionality of the proposed approach is tested through the evaluation and comparison of an example set of hydrocarbon fuels.

  1. NASA Test Flights Examine Effect of Atmospheric Turbulence on Sonic Booms

    NASA Image and Video Library

    2016-07-20

    One of three microphone arrays positioned strategically along the ground at Edwards Air Force Base, California, sits ready to collect sound signatures from sonic booms created by a NASA F/A-18 during the SonicBAT flight series. The arrays collected the sound signatures of booms that had traveled through atmospheric turbulence before reaching the ground.

  2. Apollo experience report the command and service module milestone review process

    NASA Technical Reports Server (NTRS)

    Brendle, H. L.; York, J. A.

    1974-01-01

    The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

  3. Annual report to the NASA Administrator by the Aerospace Safety Advisory Panel on the space shuttle program. Part 1: Observations and conclusions

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The panel reviewed the following areas of major significance for the Approach and Landing Test program: mission planning and crew training, flight-readiness of the Carrier Aircraft and the Orbiter, including its flight control and avionics system, facilities, and communications and ground support equipment. The management system for risk assessment was investigated. The Orbital Flight Test Program was also reviewed. Observations and recommendations are presented.

  4. Spacelab ready for transport to Washington, DC

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Spacelab is wrapped and ready for transport to the National Air and Space Museum in Washington, DC. Spacelab was designed by the European Space Agency (ESA) for the Space Shuttle program and first flew on STS-9 in November 1983. Its final flight was the STS-90 Neurolab mission in April 1998. A sister module will travel home and be placed on display in Europe. The Spacelab concept of modular experiment racks in a pressurized shirt-sleeve environment made it highly user-friendly and accessible. Numerous experiments conceived by hundreds of scientists on the ground were conducted by flight crews in orbit. Spacelab modules served as on-orbit homes for everything from squirrel monkeys to plant seeds. They supported astronomical as well as Earth observations, for servicing the Hubble Space Telescope and for research preparatory to the International Space Station. One of the greatest benefits afforded by the Spacelab missions was the opportunity to fly a mission more than once, with the second or third flight building on the experiences and data gathered from its predecessors.

  5. The hybrid bio-inspired aerial vehicle: Concept and SIMSCAPE flight simulation.

    PubMed

    Tao Zhang; Su, Steven; Nguyen, Hung T

    2016-08-01

    This paper introduces a Silver Gull-inspired hybrid aerial vehicle, the Super Sydney Silver Gull (SSSG), which is able to vary its structure, under different manoeuvre requirements, to implement three flight modes: the flapping wing flight, the fixed wing flight, and the quadcopter flight (the rotary wing flight of Unmanned Air Vehicle). Specifically, through proper mechanism design and flight mode transition, the SSSG can imitate the Silver Gull's flight gesture during flapping flight, save power consuming by switching to the fixed wing flight mode during long-range cruising, and hover at targeted area when transferring to quadcopter flight mode. Based on the aerodynamic models, the Simscape, a product of MathWorks, is used to simulate and analyse the performance of the SSSG's flight modes. The entity simulation results indicate that the created SSSG's 3D model is feasible and ready to be manufactured for further flight tests.

  6. Child and environmental risk factors predicting readiness for learning in children at high risk of dyslexia.

    PubMed

    Dilnot, Julia; Hamilton, Lorna; Maughan, Barbara; Snowling, Margaret J

    2017-02-01

    We investigate the role of distal, proximal, and child risk factors as predictors of reading readiness and attention and behavior in children at risk of dyslexia. The parents of a longitudinal sample of 251 preschool children, including children at family risk of dyslexia and children with preschool language difficulties, provided measures of socioeconomic status, home literacy environment, family stresses, and child health via interviews and questionnaires. Assessments of children's reading-related skills, behavior, and attention were used to define their readiness for learning at school entry. Children at family risk of dyslexia and children with preschool language difficulties experienced more environmental adversities and health risks than controls. The risks associated with family risk of dyslexia and with language status were additive. Both home literacy environment and child health predicted reading readiness while home literacy environment and family stresses predicted attention and behavior. Family risk of dyslexia did not predict readiness to learn once other risks were controlled and so seems likely to be best conceptualized as representing gene-environment correlations. Pooling across risks defined a cumulative risk index, which was a significant predictor of reading readiness and, together with nonverbal ability, accounted for 31% of the variance between children.

  7. Household Socioeconomic Status and Parental Investments: Direct and Indirect Relations With School Readiness in Ghana.

    PubMed

    Wolf, Sharon; McCoy, Dana Charles

    2017-07-14

    This study examines how parent socioeconomic status (SES) directly and indirectly predicts children's school readiness through pathways of parental investment. Data come from direct assessments with preschool children and surveys with their primary caregivers in Ghana at the start of the 2015-2016 school year (N = 2,137; M age  = 5.2 years). Results revealed SES-related gaps in all parental investment characteristics and child school readiness skills. Preschool involvement served as the primary mediating mechanism in the path from SES to most school readiness skills, though it did not predict executive function. The number of books in the household was marginally positively predictive of early literacy, whereas at-home stimulation was negatively related to motor, literacy, and numeracy skills. © 2017 The Authors. Child Development © 2017 Society for Research in Child Development, Inc.

  8. The Deep Impact Network Experiment Operations Center

    NASA Technical Reports Server (NTRS)

    Torgerson, J. Leigh; Clare, Loren; Wang, Shin-Ywan

    2009-01-01

    Delay/Disruption Tolerant Networking (DTN) promises solutions in solving space communications challenges arising from disconnections as orbiters lose line-of-sight with landers, long propagation delays over interplanetary links, and other phenomena. DTN has been identified as the basis for the future NASA space communications network backbone, and international standardization is progressing through both the Consultative Committee for Space Data Systems (CCSDS) and the Internet Engineering Task Force (IETF). JPL has developed an implementation of the DTN architecture, called the Interplanetary Overlay Network (ION). ION is specifically implemented for space use, including design for use in a real-time operating system environment and high processing efficiency. In order to raise the Technology Readiness Level of ION, the first deep space flight demonstration of DTN is underway, using the Deep Impact (DI) spacecraft. Called the Deep Impact Network (DINET), operations are planned for Fall 2008. An essential component of the DINET project is the Experiment Operations Center (EOC), which will generate and receive the test communications traffic as well as "out-of-DTN band" command and control of the DTN experiment, store DTN flight test information in a database, provide display systems for monitoring DTN operations status and statistics (e.g., bundle throughput), and support query and analyses of the data collected. This paper describes the DINET EOC and its value in the DTN flight experiment and potential for further DTN testing.

  9. NASA Life Support Branch staff photo

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The NASA Hugh L. Dryden Flight Research Center's Life Support staff is a very important group of people. They are responsible for the emergency escape systems in all the aircraft. Their other role is to maintain the pilot's personal survival flight equipment such as flight pressure suits, helmets, etc.. If instruction is needed for new equipment the staff are ready to give support. Left to right: Rick Borsch (Chief), Steve Spandorf, Ray Kinney, Ed Ortiz (seated front), Nick Kiriokos, Kelly Snapp and Bob McElwain.

  10. [Research activities of cosmonauts in long-duration orbital missions].

    PubMed

    2012-01-01

    The paper presents the view of space medicine and human factor experts on the problems of cosmonaut's research activities. Readiness of ISS crewmembers for conducting experiments and research equipment handling depends on the pre-flight training quality and course of adaptation to the flight conditions, the latter of particular criticality for participation in human use tests as an object.

  11. To amend the Sikes Act to promote the use of cooperative agreements under such Act for land management related to Department of Defense readiness activities and to amend title 10, United States Code, to facilitate interagency cooperation in conservation programs to avoid or reduce adverse impacts on military readiness activities.

    THOMAS, 113th Congress

    Rep. Bordallo, Madeleine Z. [D-GU-At Large

    2013-03-12

    House - 06/17/2013 Reported (Amended) by the Committee on Natural Resources. H. Rept. 113-115, Part I. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  12. Differences in the College-Readiness Rates of English Language Learners by Gender, Economic Status, and Ethnicity/Race: A Texas Statewide, Multiyear Investigation

    ERIC Educational Resources Information Center

    Resilla, Clare A.

    2017-01-01

    Purpose: The purpose of this journal-ready dissertation was to determine the degree to which differences were present in reading, mathematics, and both subjects college-readiness for English Language Learners who were enrolled in Texas high schools. In the first investigation, the extent to which English Language Learner boys differ in their…

  13. Career Profile- Subscale UAS engineer/pilot Robert "Red" Jensen- Operations Engineering Branch

    NASA Image and Video Library

    2015-08-03

    Robert “Red” Jensen is an Operations Engineer and Pilot for subscale aircraft here at NASA’s Armstrong Flight Research Center. As part fabricator, engineer and integrator, Red is responsible for testing subscale models of aircraft and ensuring they are safe, capable of flight and ready to support the center’s needs. Operations engineers are key leaders from technical concept to flight to ensure flight safety and mission success. This video highlights Red’s responsibilities and daily activities as well as some of the projects and missions he is currently working on.

  14. MCC History

    NASA Image and Video Library

    2017-02-12

    Since the days of Gemini all of America’s human spaceflight programs have been controlled by men and women stationed in one of several flight control rooms at NASA’s Johnson Space Center in Houston: the International Space Station flight controllers recently moved into an upgraded facility in the room that hosted the teams during the first manned flights of Apollo and the space shuttle. Here’s a tour of “Mission Control Houston” through the years, from its first generation through the facility ready for the flights of Orion, the spacecraft that will take humans farther into space than they’ve ever gone before.

  15. Flight Development for Cryogenic Fluid Management in Support of Exploration Missions

    NASA Technical Reports Server (NTRS)

    Chato, David J.

    2006-01-01

    This paper describes the results of the "Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology" study. The purposes of this study were to identify cryogenic fluids management technologies requiring low gravity flight experiments to bring to technology readiness level (TRL) 5-6; to study many possible flight experiment options; and to develop near-term low-cost flight experiment concepts to mature core technologies of refueling. A total of twenty-five white papers were prepared in the course of this study. Each white paper is briefly summarized and relevant references cited. A total of 90 references are cited.

  16. Medical Readiness of the Reserve Component.

    PubMed

    Brauner, Marygail K; Jackson, Timothy; Gayton, Elizabeth

    2012-01-01

    The reserve components (RCs) of the U.S. military must ensure that reservists are not only properly equipped and trained, but also medically ready to serve. Medical readiness means that service members are free from health-related conditions, including dental conditions, that could limit their ability to carry out their duties. Medically ready reservists require less medical and dental support in theater and fewer medical evacuations from theater, both of which save money and free assets for other purposes. This article identifies existing medical readiness requirements, quantifies the current status of RC medical readiness, identifies obstacles to achieving compliance, and suggests options for improving medical readiness in a cost-effective manner. The authors find that time and expense are the major barriers to the RCs achieving their overall goals for medical readiness. Recommendations include standardizing medical readiness criteria across services, improving data reporting and archiving processes, providing incentives to individuals and units to achieve medical readiness, and continuing to extend TRICARE coverage to reservists prior to deployment.

  17. Organization, Management and Function of International Space Station (ISS) Multilateral Medical Operations

    NASA Technical Reports Server (NTRS)

    Duncan, James M.; Bogomolov, V. V.; Castrucci, F.; Koike, Y.; Comtois, J. M.; Sargsyan, A. E.

    2007-01-01

    Long duration crews have inhabited the ISS since November of 2000. The favorable medical outcomes of its missions can be largely attributed to sustained collective efforts of all ISS Partners medical organizations. In-flight medical monitoring and support, although crucial, is just a component of the ISS system of Joint Medical Operations. The goal of this work is to review the principles, design, and function of the multilateral medical support of the ISS Program. The governing documents, which describe the relationships among all ISS partner medical organizations, were evaluated, followed by analysis of the roles, responsibilities, and decision-making processes of the ISS medical boards, panels, and working groups. The degree of integration of the medical support system was evaluated by reviewing the multiple levels of the status reviews and mission assurance activities carried out throughout the last six years. The Integrated Medical Group, consisting of physicians and other essential personnel in the mission control centers represents the front-line medical support of the ISS. Data from their day-to-day activities are presented weekly at the Space Medicine Operations Team (SMOT), where known or potential concerns are addressed by an international group of physicians. A broader status review is conducted monthly to project the state of crew health and medical support for the following month, and to determine measures to return to nominal state. Finally, a comprehensive readiness review is conducted during preparations for each ISS mission. The Multilateral Medical Policy Board (MMPB) issues medical policy decisions and oversees all health and medical matters. The Multilateral Space Medicine Board (MSMB) certifies crewmembers and visitors for training and space flight to the Station, and physicians to practice space medicine for the ISS. The Multilateral Medical Operations Panel (MMOP) develops medical requirements, defines and supervises implementation of operational countermeasures, environmental monitoring, medical care, and emergency medical services. MMOP assures the medical readiness of the Station for each subsequent mission or critical event. All boards and panels have functioned effectively and without interruptions even in various challenging circumstances. Based on the experience of the authors, consensus has prevailed as the primary nature of decisions made by all ISS medical groups, at all levels. The six first years of piloted operation have demonstrated the ability of the ISS medical authority groups and the medical infrastructure to implement medical policies and requirements, effectively interface with non-medical groups, and maintain the health and productivity of the crew in an integrated, multilaterally coordinated fashion. The medical support system appears to be mature and ready for further expansion of all Partners roles, and for the anticipated increase in the size of ISS crews.

  18. KSC-2014-4177

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is being lifted to the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  19. EFT-1 Delta IV Heavy lift to vertical

    NASA Image and Video Library

    2014-10-01

    This close-up view shows the United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 being raised into the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014.

  20. EFT-1 Delta IV Heavy lift to vertical

    NASA Image and Video Library

    2014-10-01

    The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014.

  1. KSC-2014-4176

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is being lifted to the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  2. EFT-1 Delta IV Heavy lift to vertical

    NASA Image and Video Library

    2014-10-01

    The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is being lifted to the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014.

  3. Sierra Nevada Corporation's Dream Chaser Test Article Altitude T

    NASA Image and Video Library

    2017-08-30

    Sierra Nevada Corporation’s Dream Chaser completed an important step toward orbital flight with a successful captive carry test at NASA’s Armstrong Flight Research Center in California, located on Edwards Air Force Base. A helicopter successfully carried a Dream Chaser test article, which has the same specifications as a flight-ready spacecraft, to the same altitude and flight conditions of an upcoming free flight test. The Dream Chaser is a lifting-body, winged spacecraft that will fly back to Earth in a manner similar to NASA’s space shuttles. The successful captive carry test clears the way for a free flight test of the spacecraft later this year in which the uncrewed Dream Chaser will be released to glide on its own and land.

  4. Sensor fault diagnosis of aero-engine based on divided flight status.

    PubMed

    Zhao, Zhen; Zhang, Jun; Sun, Yigang; Liu, Zhexu

    2017-11-01

    Fault diagnosis and safety analysis of an aero-engine have attracted more and more attention in modern society, whose safety directly affects the flight safety of an aircraft. In this paper, the problem concerning sensor fault diagnosis is investigated for an aero-engine during the whole flight process. Considering that the aero-engine is always working in different status through the whole flight process, a flight status division-based sensor fault diagnosis method is presented to improve fault diagnosis precision for the aero-engine. First, aero-engine status is partitioned according to normal sensor data during the whole flight process through the clustering algorithm. Based on that, a diagnosis model is built for each status using the principal component analysis algorithm. Finally, the sensors are monitored using the built diagnosis models by identifying the aero-engine status. The simulation result illustrates the effectiveness of the proposed method.

  5. Sensor fault diagnosis of aero-engine based on divided flight status

    NASA Astrophysics Data System (ADS)

    Zhao, Zhen; Zhang, Jun; Sun, Yigang; Liu, Zhexu

    2017-11-01

    Fault diagnosis and safety analysis of an aero-engine have attracted more and more attention in modern society, whose safety directly affects the flight safety of an aircraft. In this paper, the problem concerning sensor fault diagnosis is investigated for an aero-engine during the whole flight process. Considering that the aero-engine is always working in different status through the whole flight process, a flight status division-based sensor fault diagnosis method is presented to improve fault diagnosis precision for the aero-engine. First, aero-engine status is partitioned according to normal sensor data during the whole flight process through the clustering algorithm. Based on that, a diagnosis model is built for each status using the principal component analysis algorithm. Finally, the sensors are monitored using the built diagnosis models by identifying the aero-engine status. The simulation result illustrates the effectiveness of the proposed method.

  6. STS-79 crew on flight deck after launch

    NASA Image and Video Library

    1996-10-29

    STS079-348-004 (16 Sept. 1996) --- Soon after the space shuttle Atlantis completed its rocket mode ascent to Earth-orbit, astronaut Terrence W. Wilcutt, pilot, begins to ready the Orbiter for ten days of orbiting Earth by activating switches on the flight deck's right overhead panel. Though the launch was a nocturnal one, the crew experienced its first sunrise just after Atlantis achieved its orbital posture.

  7. Training and Personnel Systems Technology R&D Program Description FY 1988/1989. Revision

    DTIC Science & Technology

    1988-05-20

    scenario software /database, and computer generated imagery (CIG) subsystem resources; (d) investigation of feasibility of, and preparation of plans... computer language to Army flight simulator for demonstration and evaluation. The objective is to have flight simulators which use the same software as...the Automated Performance and Readiness Training System (APARTS), which is a computer software system which facilitates training management through

  8. Nanotechnology

    NASA Technical Reports Server (NTRS)

    Biaggi-Labiosa, Azlin

    2016-01-01

    Present an overview of the Nanotechnology Project at NASA's Game Changing Technology Industry Day. Mature and demonstrate flight readiness of CNT reinforced composites for future NASA mission applications?Sounding rocket test in a multiexperiment payload?Integrate into cold gas thruster system as propellant storage?The technology would provide the means for reduced COPV mass and improved damage tolerance and flight qualify CNT reinforced composites. PROBLEM/NEED BEING ADDRESSED:?Reduce weight and enhance the performance and damage tolerance of aerospace structuresGAME-CHANGING SOLUTION:?Improve mechanical properties of CNTs to eventually replace CFRP –lighter and stronger?First flight-testing of a CNT reinforced composite structural component as part of an operational flight systemUNIQUENESS:?CNT manufacturing methods developed?Flight qualify CNT reinforced composites

  9. KSC-07pd0905

    NASA Image and Video Library

    2007-04-17

    KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, a Starfighter F-104 aircraft is being prepared for test flights. Ready to climb into the cockpit is the pilot, Rick Svetkoff. The aircraft is taking part in a series of pathfinder test missions from the space shuttle runway. Two flights will generate test data to validate sonic boom assumptions about the potential impacts of suborbital and orbital commercial spaceflight from the facility. NASA is assessing the environmental impact of such flights. Starfighters Inc. of Clearwater, Fla., will perform the flights to help in assessing suborbital space launch trajectories from the runway and paving the way for future commercial space tourism and research flights from the facility. Photo credit: NASA/Kim Shiflett

  10. STS-1 operational flight profile. Volume 5: Descent, cycle 3. Appendix C: Monte Carlo dispersion analysis

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The results of three nonlinear the Monte Carlo dispersion analyses for the Space Transportation System 1 Flight (STS-1) Orbiter Descent Operational Flight Profile, Cycle 3 are presented. Fifty randomly selected simulation for the end of mission (EOM) descent, the abort once around (AOA) descent targeted line are steep target line, and the AOA descent targeted to the shallow target line are analyzed. These analyses compare the flight environment with system and operational constraints on the flight environment and in some cases use simplified system models as an aid in assessing the STS-1 descent flight profile. In addition, descent flight envelops are provided as a data base for use by system specialists to determine the flight readiness for STS-1. The results of these dispersion analyses supersede results of the dispersion analysis previously documented.

  11. Space Launch System Resource Reel 2017

    NASA Image and Video Library

    2017-12-01

    NASA's new heavy-lift rocket, the Space Launch System, will be the most powerful rocket every built, launching astronauts in NASA's Orion spacecraft on missions into deep space. Two solid rocket boosters and four RS-25 engines will power the massive rocket, providing 8 million pounds of thrust during launch. Production and testing are underway for much of the rocket's critical hardware. With major welding complete on core stage hardware for the first integrated flight of SLS and Orion, the liquid hydrogen tank, intertank and liquid oxygen tank are ready for further outfitting. NASA's barge Pegasus has transported test hardware the first SLS hardware, the engine section to NASA's Marshall Space Flight Center in Huntsville, Alabama, for testing. In preparation for testing and handling operations, engineers have built the core stage pathfinder, to practice transport without the risk of damaging flight hardware. Integrated structural testing is complete on the top part of the rocket, including the Orion stage adapter, launch vehicle stage adapter and interim cryogenic propulsion stage. The Orion Stage Adapter for SLS's first flight, which will carry 13 CubeSats as secondary payloads, is ready to be outfitted with wiring and brackets. Once structural testing and flight hardware production are complete, the core stage will undergo "green run" testing in the B-2 test stand at NASA's Stennis Space Center in Bay St. Louis, Mississippi. For more information about SLS, visit nasa.gov/sls.

  12. Length of stay after vaginal birth: sociodemographic and readiness-for-discharge factors.

    PubMed

    Weiss, Marianne; Ryan, Polly; Lokken, Lisa; Nelson, Magdalen

    2004-06-01

    The impact of reductions in postpartum length of stay have been widely reported, but factors influencing length of hospital stay after vaginal birth have received less attention. The study purpose was to compare the sociodemographic characteristics and readiness for discharge of new mothers and their newborns at 3 discharge time intervals, and to determine which variables were associated with postpartum length of stay. The study sample comprised 1,192 mothers who were discharged within 2 postpartum days after uncomplicated vaginal birth at a tertiary perinatal center in the midwestern United States. The sample was divided into 3 postpartum length-of-stay groups: group 1 (18-30 hr), group 2 (31-42 hr), and group 3 (43-54 hr). Sociodemographic and readiness-for-discharge data were collected by self-report and from a computerized hospital information system. Measures of readiness for discharge included perceived readiness (single item and Readiness for Discharge After Birth Scale), documented maternal and neonatal clinical problems, and feeding method. Compared with other groups, the longest length-of-stay group was older; of higher socioeconomic status and education; and with more primiparous, breastfeeding, white, married mothers who were living with the baby's father, had adequate home help, and had a private payor source. This group also reported greater readiness for discharge, but their newborns had more documented clinical problems during the postbirth hospitalization. In logistic regression modeling, earlier discharge was associated with young age, multiparity, public payor source, low socioeconomic status, lack of readiness for discharge, bottle-feeding, and absence of a neonatal clinical problem. Sociodemographic characteristics and readiness for discharge (clinical and perceived) were associated with length of postpartum hospital stay. Length of stay is an outcome of a complex interface between patient, provider, and payor influences on discharge timing that requires additional study. Including perceived readiness for discharge in clinical discharge criteria will add an important dimension to assessment of readiness for discharge after birth.

  13. Health promotion research in active duty army soldiers: The road to a fit and ready force.

    PubMed

    McCarthy, Mary S; Elshaw, Evelyn B; Szekely, Barbara M; Pflugeisen, Bethann

    In the last decade the Military Health System has changed its paradigm to focus on health promotion and disease prevention. This paper reviews a decade of research exploring the effects of military life on nutritional status and bone health of Army soldiers. Descriptive and experimental approaches have assessed occupational demands on soldiers in variable environments that require optimal nutrition status and physical health. The prevalence of overweight and obesity in the military has risen dramatically and the implications for health, readiness, productivity, and cost demands attention. The related nutritional deficits such as suboptimal vitamin D status likely contribute to musculoskeletal injuries which have a greater impact on the performance and readiness of soldiers than any other medical condition in peacetime or conflict. The greatest challenge in our system for health is optimizing the performance of all soldiers while minimizing health risks and long-term disability resulting from occupational hazards, particularly those inherent to war. Published by Elsevier Inc.

  14. 14 CFR 415.37 - Flight readiness and communications plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... constraints, rules and abort procedures are listed and consolidated in a safety directive or notebook approved... consistency of licensee and Federal launch range countdown checklists. (4) Dress rehearsal procedures that— (i...

  15. A hawk is ready for flight

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This Broad-Winged Hawk is ready for flight from its perch on a utility pole at Kennedy Space Center. This hawk's habitat is chiefly deciduous woodland, ranging from southern Canada south throughout the eastern United States, including a small area of Central Florida. It winters in tropical South America. The Center shares a boundary with the Merritt Island National Wildlife Refuge, a haven and habitat for more than 331 species of birds. The Refuge encompasses 92,000 acres that are also a habitat for 31 mammals, 117 fishes, and 65 amphibians and reptiles. The marshes and open water of the refuge provide wintering areas for 23 species of migratory waterfowl, as well as a year-round home for great blue herons, great egrets, wood storks, cormorants, brown pelicans and other species of marsh and shore birds, as well as a variety of insects.

  16. Readiness of hospitals to provide Kangaroo Mother Care (KMC) and documentation of KMC service delivery: Analysis of Malawi 2014 Emergency Obstetric and Newborn Care (EmONC) survey data.

    PubMed

    Chavula, Kondwani; Likomwa, Dyson; Valsangkar, Bina; Luhanga, Richard; Chimtembo, Lydia; Dube, Queen; Gobezie, Wasihun Andualem; Guenther, Tanya

    2017-12-01

    Malawi introduced Kangaroo Mother Care (KMC) in 1999 as part of its efforts to address newborn morbidity and mortality and has continued to expand KMC services across the country. Yet, data on availability of KMC services and routine service provision are limited. Data from the 2014 Emergency Obstetric Newborn Care (EmONC) survey, which was a census of all 87 hospitals in Malawi, were analyzed. The WHO service availability and readiness domains were used to generate indicators for KMC service readiness and an additional domain for documentation of KMC services was included. Levels of KMC service delivery were quantified using data extracted from a 12-month register review and a KMC initiation rate was calculated for each facility by dividing the reported number of babies initiated on KMC by the number of live births at facility. We defined three levels of KMC readiness and two levels of KMC operational status. 79% of hospitals (69/87) reported providing inpatient KMC services. More than half of the hospitals (62%; 54/87) met the most basic definition of readiness (staff, space for KMC and functional weighing scale) and 35% (30/87) met an expanded definition of readiness (guidelines, staff, space, scale and register in use). Only 15 % (13/87) of hospitals had all KMC tracer items. Less than half of the hospitals (43%; 37/87) met criteria for KMC operational status at minimum levels (≥1/100 live births), and just 16% (14/87) met criteria for KMC operational status at routine levels (≥5/100 live births). Our study found large differences between reported levels of KMC services and documented levels of KMC readiness and service provision among hospitals in Malawi. It is recommended that facility assessments of services such as KMC include record reviews to better estimate service availability and delivery. Further efforts to strengthen the capacity of Malawian hospitals to deliver KMC are needed.

  17. Overview of Stirling Technology Research at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Schifer, Nicholas A.; Williams, Zachary D.; Metscher, Jonathan F.

    2016-01-01

    Stirling Radioisotope Power Systems (RPSs) are under development to provide power on future space science missions where robotic spacecraft will orbit, fly by, land, or rove using less than a quarter of the plutonium the currently available RPS uses to produce about the same power. NASA Glenn Research Center's newly formulated Stirling Cycle Technology Development Project (SCTDP) continues development of Stirling-based systems and subsystems, which include a flight-like generator and related housing assembly, controller, and convertors. The project also develops less mature technologies under Stirling Technology Research, with a focus on demonstration in representative environments to increase the technology readiness level (TRL). Matured technologies are evaluated for selection in future generator designs. Stirling Technology Research tasks focus on a wide variety of objectives, including increasing temperature capability to enable new environments, reducing generator mass and/or size, improving reliability and system fault tolerance, and developing alternative designs. The task objectives and status are summarized.

  18. Overview of Stirling Technology Research at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Schifer, Nicholas A.; Williams, Zachary D.; Metscher, Jonathan F.

    2015-01-01

    Stirling Radioisotope Power Systems (RPS) are under development to provide power on future space science missions where robotic spacecraft will orbit, flyby, land or rove using less than a quarter of the plutonium the currently available RPS uses to produce about the same power. Glenn Research Center's (GRC's) newly formulated Stirling Cycle Technology Development Project (SCTDP) continues development of Stirling-based systems and subsystems, which include a flight-like generator and related housing assembly, controller, and convertors. The project also develops less mature technologies under Stirling Technology Research, with a focus on demonstration in representative environments to increase the technology readiness level (TRL). Matured technologies are evaluated for selection in future generator designs. Stirling Technology Research tasks focus on a wide variety of objectives, including increasing temperature capability to enable new environments, reducing generator mass and/or size, improving reliability or system fault tolerance, and developing alternative designs. The task objectives and status are summarized.

  19. Pulsed Plasma Thruster Technology for Small Satellite Missions

    NASA Technical Reports Server (NTRS)

    Myers, Roger M.; Oleson, Steven R.; Mcguire, Melissa; Meckel, Nicole J.; Cassady, R. Joseph

    1995-01-01

    Pulsed plasma thrusters (PPT's) offer the combined benefits of extremely low average electric power requirements (1 to 150 W), high specific impulse (approximately 1000 s), and system simplicity derived from the use of an inert solid propellant. Potential applications range from orbit insertion and maintenance of small satellites to attitude control for large geostationary communications satellites. While PPT's have been used operationally on several spacecraft, there has been no new PPT technology development since the early 1970's. As result of the rapid growth in the small satellite community and the broad range of PPT applications, NASA has initiated a development program with the objective of dramatically reducing the PPT dry mass, increasing PPT performance, and demonstrating a flight ready system by October 1997. This paper presents the results of a series of near-Earth mission studies including both primary and auxiliary propulsion and attitude control functions and reviews the status of NASA's on-going development program.

  20. Using Technology Readiness Level (TRL), Life Cycle Cost (LCC), and Other Metrics to Supplement Equivalent System Mass (ESM) in Advanced Life Support (ALS)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2003-01-01

    The ALS project plan goals are reducing cost, improving performance, and achieving flight readiness. ALS selects projects to advance the mission readiness of low cost, high performance technologies. The role of metrics is to help select good projects and report progress. The Equivalent Mass (EM) of a system is the sum of the estimated mass of the hardware, of its required materials and spares, and of the pressurized volume, power supply, and cooling system needed to support the hardware in space. EM is the total payload launch mass needed to provide and support a system. EM is directly proportional to the launch cost.

  1. The Effect of Combat on Aircrew Subjective Readiness and LSO Grades during Operation Desert Shield/Storm.

    DTIC Science & Technology

    1992-05-01

    These periods of SUSOPS often require many hours of mission planning and briefing by the same aircrew who later fly into combat. This ’front-loading’ of...CsCOLLATERIAL OUTr. GDUTIDIES a au LE.P Sa PlKF PoSTRIKE PLANNING EXEsERCISE DATE MUEAS 0aEMMF PsMEOCEATIONIMEST XETESTING!11 11 I1illilll ii I-. II...duration and infrequent occurrence, functional check flights (FCF) and post maintenance check flights ( PMCF ) were also included among the TRG flights

  2. NASA's B-52 mother ship carries the X-43A and its booster rocket on a captive carry flight Jan. 26, 2004

    NASA Image and Video Library

    2004-01-26

    NASA's historic B-52 mother ship carried the X-43A and its Pegasus booster rocket on a captive carry flight from Edwards Air Force Base Jan. 26, 2004. The X-43A and its booster remained mated to the B-52 throughout the two-hour flight, intended to check its readiness for launch. The hydrogen-fueled aircraft is autonomous and has a wingspan of approximately 5 feet, measures 12 feet long and weighs about 2,800 pounds.

  3. Disruption Tolerant Networking Flight Validation Experiment on NASA's EPOXI Mission

    NASA Technical Reports Server (NTRS)

    Wyatt, Jay; Burleigh, Scott; Jones, Ross; Torgerson, Leigh; Wissler, Steve

    2009-01-01

    In October and November of 2008, the Jet Propulsion Laboratory installed and tested essential elements of Delay/Disruption Tolerant Networking (DTN) technology on the Deep Impact spacecraft. This experiment, called Deep Impact Network Experiment (DINET), was performed in close cooperation with the EPOXI project which has responsibility for the spacecraft. During DINET some 300 images were transmitted from the JPL nodes to the spacecraft. Then they were automatically forwarded from the spacecraft back to the JPL nodes, exercising DTN's bundle origination, transmission, acquisition, dynamic route computation, congestion control, prioritization, custody transfer, and automatic retransmission procedures, both on the spacecraft and on the ground, over a period of 27 days. All transmitted bundles were successfully received, without corruption. The DINET experiment demonstrated DTN readiness for operational use in space missions. This activity was part of a larger NASA space DTN development program to mature DTN to flight readiness for a wide variety of mission types by the end of 2011. This paper describes the DTN protocols, the flight demo implementation, validation metrics which were created for the experiment, and validation results.

  4. Developing an Onboard Traffic-Aware Flight Optimization Capability for Near-Term Low-Cost Implementation

    NASA Technical Reports Server (NTRS)

    Wing, David J.; Ballin, Mark G.; Koczo, Stefan, Jr.; Vivona, Robert A.; Henderson, Jeffrey M.

    2013-01-01

    The concept of Traffic Aware Strategic Aircrew Requests (TASAR) combines Automatic Dependent Surveillance Broadcast (ADS-B) IN and airborne automation to enable user-optimal in-flight trajectory replanning and to increase the likelihood of Air Traffic Control (ATC) approval for the resulting trajectory change request. TASAR is designed as a near-term application to improve flight efficiency or other user-desired attributes of the flight while not impacting and potentially benefiting ATC. Previous work has indicated the potential for significant benefits for each TASAR-equipped aircraft. This paper will discuss the approach to minimizing TASAR's cost for implementation and accelerating readiness for near-term implementation.

  5. A knowledge-based flight status monitor for real-time application in digital avionics systems

    NASA Technical Reports Server (NTRS)

    Duke, E. L.; Disbrow, J. D.; Butler, G. F.

    1989-01-01

    The Dryden Flight Research Facility of the National Aeronautics and Space Administration (NASA) Ames Research Center (Ames-Dryden) is the principal NASA facility for the flight testing and evaluation of new and complex avionics systems. To aid in the interpretation of system health and status data, a knowledge-based flight status monitor was designed. The monitor was designed to use fault indicators from the onboard system which are telemetered to the ground and processed by a rule-based model of the aircraft failure management system to give timely advice and recommendations in the mission control room. One of the important constraints on the flight status monitor is the need to operate in real time, and to pursue this aspect, a joint research activity between NASA Ames-Dryden and the Royal Aerospace Establishment (RAE) on real-time knowledge-based systems was established. Under this agreement, the original LISP knowledge base for the flight status monitor was reimplemented using the intelligent knowledge-based system toolkit, MUSE, which was developed under RAE sponsorship. Details of the flight status monitor and the MUSE implementation are presented.

  6. Archambault wearing LES in the FD on STS-117 Space Shuttle Atlantis

    NASA Image and Video Library

    2007-06-21

    S117-E-09438 (21 June 2007) --- Attired in his launch and entry garment, astronaut Lee Archambault, STS-117 pilot, appears all ready for re-entry and landing of the Space Shuttle Atlantis, as he signals thumbs-up from the pilot's station on the starboard side of the shuttle's flight deck. Unfortunately, the weather in Florida was not ready, and the crew had to wait until the following day to land. They ultimately landed in California.

  7. Project Ready STEM Act

    THOMAS, 113th Congress

    Rep. Fudge, Marcia L. [D-OH-11

    2013-03-21

    House - 04/23/2013 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  8. Project Ready STEM Act

    THOMAS, 112th Congress

    Rep. Fudge, Marcia L. [D-OH-11

    2012-04-17

    House - 09/26/2012 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. Crew Members - First Manned Apollo Flight - Unmanned Mission Launch - Cape

    NASA Image and Video Library

    1968-01-22

    S68-18700 (22 Jan. 1968) --- Two prime crew members of the first manned Apollo space flight were present at Cape Kennedy for the launch of the Apollo V (LM-1/Saturn 204) unmanned space mission. On left is astronaut Walter M. Schirra Jr.; and on right is astronaut R. Walter Cunningham. In background is the Apollo V stack at Launch Complex 37 ready for launch.

  10. Aircraft Carrier Flight Deck Fire Fighting Tactics and Equipment Evaluation Tests

    DTIC Science & Technology

    1987-02-26

    pattern nozzles; 8. proper fire fighting techniques for possible titanium ignition in an F-14 crash (deleted later by direction of FLSC, being studied ...separately); 9. effect of full fire involvement of "ready for flight" aircraft (deleted later by direction of FLSC, being studied separately). The...to refine and identify specific hardware and tactical requirements generated from the studies conducted during the scoping tests; 3. concept

  11. An improved approach for flight readiness certification: Probabilistic models for flaw propagation and turbine blade failure. Volume 1: Methodology and applications

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with analytical modeling of failure phenomena to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in analytical modeling, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which analytical models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. State-of-the-art analytical models currently employed for designs failure prediction, or performance analysis are used in this methodology. The rationale for the statistical approach taken in the PFA methodology is discussed, the PFA methodology is described, and examples of its application to structural failure modes are presented. The engineering models and computer software used in fatigue crack growth and fatigue crack initiation applications are thoroughly documented.

  12. An improved approach for flight readiness certification: Probabilistic models for flaw propagation and turbine blade failure. Volume 2: Software documentation

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflights systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with analytical modeling of failure phenomena to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in analytical modeling, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which analytical models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. State-of-the-art analytical models currently employed for design, failure prediction, or performance analysis are used in this methodology. The rationale for the statistical approach taken in the PFA methodology is discussed, the PFA methodology is described, and examples of its application to structural failure modes are presented. The engineering models and computer software used in fatigue crack growth and fatigue crack initiation applications are thoroughly documented.

  13. An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 2: Software documentation

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes, These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

  14. An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples, volume 1

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

  15. EFT-1 Delta IV Heavy lift to vertical

    NASA Image and Video Library

    2014-10-01

    The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is being lifted to the vertical position in the mobile service tower on the pad at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014.

  16. KSC-2014-4178

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – This close-up view shows the United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 being raised into the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  17. KSC-2014-4179

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – This close-up view shows the United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 being raised into the vertical position at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  18. KSC-2014-4184

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  19. KSC-2014-4181

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is being lifted to the vertical position in the mobile service tower on the pad at the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  20. KSC-2014-4180

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – The United Launch Alliance Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  1. EFT-1 Delta IV Heavy lift to vertical

    NASA Image and Video Library

    2014-10-01

    United Launch Alliance, or ULA, workers monitor the progress as the ULA Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014.

  2. 75 FR 80669 - Wright Brothers Day, 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-22

    ... the steady winds of Kitty Hawk, North Carolina and conquered the age-old dream of manned flight. That... boundaries of human knowledge and realize tomorrow what we can only dream today. We must also ready our...

  3. TEST STAND 4697 CONSTRUCTION TOP OUT

    NASA Image and Video Library

    2016-03-04

    ON MARCH 4, CREW MEMBERS READIED A 900-POUND STEEL BEAM TO "TOP OUT" TEST STAND 4697, WHICH IS UNDER CONSTRUCTION TO TEST THE SPACE LAUNCH SYSTEM LIQUID OXYGEN TANK AT NASA'S MARSHALL SPACE FLIGHT CENTER.

  4. 21st Century Readiness Act

    THOMAS, 112th Congress

    Rep. Petri, Thomas E. [R-WI-6

    2011-07-14

    House - 09/08/2011 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  5. 21st Century Readiness Act

    THOMAS, 113th Congress

    Rep. Petri, Thomas E. [R-WI-6

    2013-01-22

    House - 04/23/2013 Referred to the Subcommittee on Early Childhood, Elementary, and Secondary Education. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  6. Career Profile: Flight Operations Engineer (Airborne Science) Robert Rivera

    NASA Image and Video Library

    2015-05-14

    Operations engineers at NASA's Armstrong Flight Research Center help to advance science, technology, aeronautics, and space exploration by managing operational aspects of a flight research project. They serve as the governing authority on airworthiness related to the modification, operation, or maintenance of specialized research or support aircraft so those aircraft can be flown safely without jeopardizing the pilots, persons on the ground or the flight test project. With extensive aircraft modifications often required to support new research and technology development efforts, operations engineers are key leaders from technical concept to flight to ensure flight safety and mission success. Other responsibilities of an operations engineer include configuration management, performing systems design and integration, system safety analysis, coordinating flight readiness activities, and providing real-time flight support. This video highlights the responsibilities and daily activities of NASA Armstrong operations engineer Robert Rivera during the preparation and execution of the Global Hawk airborne missions under NASA's Science Mission Directorate.

  7. Ready to Learn Act

    THOMAS, 112th Congress

    Sen. Murray, Patty [D-WA

    2011-06-09

    Senate - 06/09/2011 Read twice and referred to the Committee on Health, Education, Labor, and Pensions. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  8. Ready to Learn Act

    THOMAS, 113th Congress

    Sen. Murray, Patty [D-WA

    2013-02-13

    Senate - 02/13/2013 Read twice and referred to the Committee on Health, Education, Labor, and Pensions. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. Ready or Not: The Academic College Readiness of Southeast Asian Americans

    ERIC Educational Resources Information Center

    Her, Chia S.

    2014-01-01

    The educational experiences of Southeast Asian Americans, particularly Cambodian Americans, Hmong Americans, Laotian Americans, and Vietnamese Americans, are characterized by numerous challenges, which can be attributed to their migration history, socioeconomic status, and English proficiency. By the end of 11th grade, a high percentage of…

  10. Development toward School Readiness: A Holistic Model

    ERIC Educational Resources Information Center

    Gaynor, Alan Kibbe

    2015-01-01

    A systemic analysis of early childhood development factors explains the variance in school readiness among representative U.S. 5-year-olds. The underlying theory incorporates a set of causally interactive endogenous variables that are hypothesized to be driven by the effects of three exogenous variables: parental education, immigrant status and…

  11. Factors Affecting Minority Students' College Readiness in Mathematics

    ERIC Educational Resources Information Center

    Houser, Latisha Cheree-Square; An, Shuhua

    2015-01-01

    This study examined how gender; race/ethnicity; language; socioeconomic status; California Standards Test (CST) scores in mathematics, science, and ELA; and California High School Exit Exam mathematics predict college-ready results on the Early Assessment Program (EAP) in mathematics in urban areas of southern California. Approximately 1,700 high…

  12. High-oleic ready-to-use therapeutic food maintains docosahexaenoic acid status in severe malnutrition

    USDA-ARS?s Scientific Manuscript database

    Ready-to-use therapeutic food (RUTF) is the preferred treatment for uncomplicated severe acute malnutrition. It contains large amounts of linoleic acid and little a-linolenic acid, which may reduce the availability of docosahexaenoic acid (DHA) and eicosapentaenoic acid (EPA) to the recovering child...

  13. 21st Century Readiness Act

    THOMAS, 112th Congress

    Sen. Hagan, Kay R. [D-NC

    2011-06-09

    Senate - 06/09/2011 Read twice and referred to the Committee on Health, Education, Labor, and Pensions. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  14. The NASA Evolutionary Xenon Thruster (NEXT): NASA's Next Step for U.S. Deep Space Propulsion

    NASA Technical Reports Server (NTRS)

    Schmidt, George R.; Patterson, Michael J.; Benson, Scott W.

    2008-01-01

    NASA s Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to enhance the performance and lower the costs of future NASA space science missions. This is being accomplished by producing Engineering Model (EM) and Prototype Model (PM) components, validating these via qualification-level and integrated system testing, and preparing the transition of NEXT technologies to flight system development. The project is currently completing one of the final milestones of the effort, that is operation of an integrated NEXT Ion Propulsion System (IPS) in a simulated space environment. This test will advance the NEXT system to a NASA Technology Readiness Level (TRL) of 6 (i.e., operation of a prototypical system in a representative environment), and will confirm its readiness for flight. Besides its promise for upcoming NASA science missions, NEXT may have excellent potential for future commercial and international spacecraft applications.

  15. Family System of Advanced Charring Ablators for Planetary Exploration Missions

    NASA Technical Reports Server (NTRS)

    Congdon, William M.; Curry, Donald M.

    2005-01-01

    Advanced Ablators Program Objectives: 1) Flight-ready(TRL-6) ablative heat shields for deep-space missions; 2) Diversity of selection from family-system approach; 3) Minimum weight systems with high reliability; 4) Optimized formulations and processing; 5) Fully characterized properties; and 6) Low-cost manufacturing. Definition and integration of candidate lightweight structures. Test and analysis database to support flight-vehicle engineering. Results from production scale-up studies and production-cost analyses.

  16. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-01

    This photograph shows the Saturn V assembled LOX (Liquid Oxygen) and fuel tanks ready for transport from the Manufacturing Engineering Laboratory at Marshall Space Flight Center in Huntsville, Alabama. The tanks were then shipped to the launch site at Kennedy Space Center for a flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  17. Precision Departure Release Capability (PDRC) Final Report

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn A.; Capps, Richard; Day, Kevin Brian; Kistler, Matthew Stephen; Gaither, Frank; Juro, Greg

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows that may be subject to constraints that create localized demand/capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool, based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas/Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents research results from the PDRC research activity. Companion papers present the Concept of Operations and a Technology Description.

  18. Precision Departure Release Capability (PDRC) Technology Description

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn A.; Capps, Richard; Day, Kevin; Robinson, Corissia; Null, Jody R.

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Technology Description. Companion papers include the Final Report and a Concept of Operations.

  19. Precision Departure Release Capability (PDRC): NASA to FAA Research Transition

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn; Davis, Thomas J.

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demand-capacity imbalances. When demand exceeds capacity, Traffic Management Coordinators (TMCs) and Frontline Managers (FLMs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release time is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that improves tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions and departure runway assignments to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept reduces uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs and FLMs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station in Dallas-Fort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations.

  20. Precision Departure Release Capability (PDRC) Concept of Operations

    NASA Technical Reports Server (NTRS)

    Engelland, Shawn; Capps, Richard A.; Day, Kevin Brian

    2013-01-01

    After takeoff, aircraft must merge into en route (Center) airspace traffic flows which may be subject to constraints that create localized demandcapacity imbalances. When demand exceeds capacity Traffic Management Coordinators (TMCs) often use tactical departure scheduling to manage the flow of departures into the constrained Center traffic flow. Tactical departure scheduling usually involves use of a Call for Release (CFR) procedure wherein the Tower must call the Center TMC to coordinate a release time prior to allowing the flight to depart. In present-day operations release times are computed by the Center Traffic Management Advisor (TMA) decision support tool based upon manual estimates of aircraft ready time verbally communicated from the Tower to the Center. The TMA-computed release is verbally communicated from the Center back to the Tower where it is relayed to the Local controller as a release window that is typically three minutes wide. The Local controller will manage the departure to meet the coordinated release time window. Manual ready time prediction and verbal release time coordination are labor intensive and prone to inaccuracy. Also, use of release time windows adds uncertainty to the tactical departure process. Analysis of more than one million flights from January 2011 indicates that a significant number of tactically scheduled aircraft missed their en route slot due to ready time prediction uncertainty. Uncertainty in ready time estimates may result in missed opportunities to merge into constrained en route flows and lead to lost throughput. Next Generation Air Transportation System (NextGen) plans call for development of Tower automation systems capable of computing surface trajectory-based ready time estimates. NASA has developed the Precision Departure Release Capability (PDRC) concept that uses this technology to improve tactical departure scheduling by automatically communicating surface trajectory-based ready time predictions to the Center scheduling tool. The PDRC concept also incorporates earlier NASA and FAA research into automation-assisted CFR coordination. The PDRC concept helps reduce uncertainty by automatically communicating coordinated release times with seconds-level precision enabling TMCs to work with target times rather than windows. NASA has developed a PDRC prototype system that integrates the Center's TMA system with a research prototype Tower decision support tool. A two-phase field evaluation was conducted at NASA's North Texas Research Station (NTX) in DallasFort Worth. The field evaluation validated the PDRC concept and demonstrated reduced release time uncertainty while being used for tactical departure scheduling of more than 230 operational flights over 29 weeks of operations. This paper presents the Concept of Operations. Companion papers include the Final Report and a Technology Description. ? SUBJECT:

  1. Worker Ownership, Readiness and Knowledge Act

    THOMAS, 111th Congress

    Sen. Sanders, Bernard [I-VT

    2009-12-18

    Senate - 12/18/2009 Read twice and referred to the Committee on Health, Education, Labor, and Pensions. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  2. French Flight Test Program LEA Status

    DTIC Science & Technology

    2010-09-01

    RTO-EN-AVT-185 17 - 1 French Flight Test Program LEA Status Francois FALEMPIN MBDA France 1 avenue Reaumur Le Plessis Robinson FRANCE ...TITLE AND SUBTITLE French Flight Test Program LEA Status 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT ...Bouchez, Nicolas Gascoin, Measurement for fuel reforming for scramjet thermal management: status of COMPARER project - AIAA-2009-7373. French

  3. Adaptive structures flight experiments

    NASA Astrophysics Data System (ADS)

    Martin, Maurice

    The topics are presented in viewgraph form and include the following: adaptive structures flight experiments; enhanced resolution using active vibration suppression; Advanced Controls Technology Experiment (ACTEX); ACTEX program status; ACTEX-2; ACTEX-2 program status; modular control patch; STRV-1b Cryocooler Vibration Suppression Experiment; STRV-1b program status; Precision Optical Bench Experiment (PROBE); Clementine Spacecraft Configuration; TECHSAT all-composite spacecraft; Inexpensive Structures and Materials Flight Experiment (INFLEX); and INFLEX program status.

  4. Adaptive Structures Flight Experiments

    NASA Technical Reports Server (NTRS)

    Martin, Maurice

    1992-01-01

    The topics are presented in viewgraph form and include the following: adaptive structures flight experiments; enhanced resolution using active vibration suppression; Advanced Controls Technology Experiment (ACTEX); ACTEX program status; ACTEX-2; ACTEX-2 program status; modular control patch; STRV-1b Cryocooler Vibration Suppression Experiment; STRV-1b program status; Precision Optical Bench Experiment (PROBE); Clementine Spacecraft Configuration; TECHSAT all-composite spacecraft; Inexpensive Structures and Materials Flight Experiment (INFLEX); and INFLEX program status.

  5. Readiness for First Crewed Flight

    NASA Technical Reports Server (NTRS)

    Schaible, Dawn M.

    2011-01-01

    The NASA Engineering and Safety Center (NESC) was requested to develop a generic framework for evaluating whether any given program has sufficiently complete and balanced plans in place to allow crewmembers to fly safely on a human spaceflight system for the first time (i.e., first crewed flight). The NESC assembled a small team which included experts with experience developing robotic and human spaceflight and aviation systems through first crewed test flight and into operational capability. The NESC team conducted a historical review of the steps leading up to the first crewed flights of Mercury through the Space Shuttle. Benchmarking was also conducted with the United States (U.S.) Air Force and U.S. Navy. This report contains documentation of that review.

  6. Shuttle spacelab simulation using a Lear jet aircraft: Mission no. 3 (ASSESS program)

    NASA Technical Reports Server (NTRS)

    Reller, J. O., Jr.; Neel, C. B.; Mason, R. H.

    1974-01-01

    The third ASSESS mission using a Lear Jet aircraft conducted to continue the study of scientific experiment operations in a simulated Spacelab environment. Prior to the mission, research planning and equipment preparation were observed and documented. A flight readiness review for the experiment was conducted. Nine of the ten scheduled flights were completed during simulation mission and all major science objectives were accomplished. The equipment was well qualified for flight and gave little trouble; telescope malfunctions occurred early in the mission and were corrected. Both real-time and post-observation data evaluation were used to assess research progress and to plan subsequent flight observations for maximum effectiveness.

  7. KSC-07pd0906

    NASA Image and Video Library

    2007-04-17

    KENNEDY SPACE CENTER, FLA. -- On the KSC Shuttle Landing Facility, pilot Rick Svetkoff (left) and co-pilot Dave Waldrop are ready to climb into the cockpit of the Starfighter F-104. The aircraft is taking part in a series of pathfinder test missions from the space shuttle runway. Two flights will generate test data to validate sonic boom assumptions about the potential impacts of suborbital and orbital commercial spaceflight from the facility. NASA is assessing the environmental impact of such flights. Starfighters Inc. of Clearwater, Fla., will perform the flights to help in assessing suborbital space launch trajectories from the runway and paving the way for future commercial space tourism and research flights from the facility. Photo credit: NASA/Kim Shiflett

  8. Achieving TASAR Operational Readiness

    NASA Technical Reports Server (NTRS)

    Wing, David J.

    2015-01-01

    NASA has been developing and testing the Traffic Aware Strategic Aircrew Requests (TASAR) concept for aircraft operations featuring a NASA-developed cockpit automation tool, the Traffic Aware Planner (TAP), which computes traffic/hazard-compatible route changes to improve flight efficiency. The TAP technology is anticipated to save fuel and flight time and thereby provide immediate and pervasive benefits to the aircraft operator, as well as improving flight schedule compliance, passenger comfort, and pilot and controller workload. Previous work has indicated the potential for significant benefits for TASAR-equipped aircraft, and a flight trial of the TAP software application in the National Airspace System has demonstrated its technical viability. This paper reviews previous and ongoing activities to prepare TASAR for operational use.

  9. Readiness to Change as a Predictor of Treatment Engagement and Outcome for Partner Violent Men.

    PubMed

    Maldonado, Ana I; Murphy, Christopher M

    2018-05-01

    Resistance to change has been long recognized as a barrier to successful intervention for partner violent individuals. Using archival data from a community-based intimate partner violence (IPV) intervention program, the current study investigated readiness to change as a predictor of treatment engagement and outcome in cognitive behavioral therapy (CBT) for IPV, and examined whether court referral status, antisocial personality characteristics, and borderline personality characteristics moderate these associations. During program intake, male IPV perpetrators ( N = 195) provided structured interview data on demographics and referral source, and self-report data on readiness to change, borderline personality traits, and antisocial personality traits. During group CBT, participants and their therapists completed measures of the working alliance, and the therapists completed ratings of compliance with behavior change homework assignments. Criminal recidivism data were gathered from public records for 2 years after scheduled completion of treatment. Readiness to change significantly predicted client ratings of the working alliance, but not therapist ratings of the working alliance, CBT homework compliance, or criminal recidivism. Court referral status moderated predictive associations between readiness to change and working alliance ratings, and borderline and antisocial characteristics moderated predictive associations between readiness to change and working alliance as well as criminal recidivism. Interestingly, readiness to change is a stronger predictor of positive treatment response for court- versus self-referred individuals and for those with either very low or very high levels of borderline and antisocial characteristics. Hence, strategies to enhance motivation to change may be particularly be important for IPV perpetrators with these characteristics.

  10. St. Juliens Creek Ocean Construction Equipment Inventory Support Facility Five Year Plan. Volume 1. Results and Discussion.

    DTIC Science & Technology

    1983-08-01

    on a ready-for- issue con- dition so that, except for the construction platform 1-4 iAf 1.3 Approach Performing the inventory had the added benefit of...individual items listed in the catalog, reference I, needs were then prioritized giving the highest priority and kept in ready-for- issue (RFI) status to...maintained in ready-for- issue (RFI) condition require support for mobilization/demobilization, The OCEI Support Facility was es overhaul, storage

  11. Technology Maturation in Preparation for the Cryogenic Propellant Storage and Transfer (CPST) Technology Demonstration Mission (TDM)

    NASA Technical Reports Server (NTRS)

    Meyer, Michael L.; Doherty, Michael P.; Moder, Jeffrey P.

    2014-01-01

    In support of its goal to find an innovative path for human space exploration, NASA embarked on the Cryogenic Propellant Storage and Transfer (CPST) Project, a Technology Demonstration Mission (TDM) to test and validate key cryogenic capabilities and technologies required for future exploration elements, opening up the architecture for large in-space cryogenic propulsion stages and propellant depots. Recognizing that key Cryogenic Fluid Management (CFM) technologies anticipated for on-orbit (flight) demonstration would benefit from additional maturation to a readiness level appropriate for infusion into the design of the flight demonstration, the NASA Headquarters Space Technology Mission Directorate (STMD) authorized funding for a one-year technology maturation phase of the CPST project. The strategy, proposed by the CPST Project Manager, focused on maturation through modeling, concept studies, and ground tests of the storage and fluid transfer of CFM technology sub-elements and components that were lower than a Technology Readiness Level (TRL) of 5. A technology maturation plan (TMP) was subsequently approved which described: the CFM technologies selected for maturation, the ground testing approach to be used, quantified success criteria of the technologies, hardware and data deliverables, and a deliverable to provide an assessment of the technology readiness after completion of the test, study or modeling activity. The specific technologies selected were grouped into five major categories: thick multilayer insulation, tank applied active thermal control, cryogenic fluid transfer, propellant gauging, and analytical tool development. Based on the success of the technology maturation efforts, the CPST project was approved to proceed to flight system development.

  12. KSC-2014-4182

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – United Launch Alliance, or ULA, workers monitor the progress as the ULA Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  13. KSC-2014-4183

    NASA Image and Video Library

    2014-10-01

    CAPE CANAVERAL, Fla. – United Launch Alliance, or ULA, workers monitor the progress as the ULA Delta IV Heavy rocket for Exploration Flight Test-1 is lifted to the vertical position in the mobile service tower on the pad at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida. The Delta IV Heavy is being readied to launch Orion on its first flight test. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Daniel Casper

  14. A Synopsis of Ion Propulsion Development Projects in the United States: SERT 1 to Deep Space I

    NASA Technical Reports Server (NTRS)

    Sovey, James S.; Rawlin, Vincent K.; Patterson, Michael J.

    1999-01-01

    The historical background and characteristics of the experimental flights of ion propulsion systems and the major ground-based technology demonstrations were reviewed. The results of the first successful ion engine flight in 1964, SERT I which demonstrated ion beam neutralization, are discussed along with the extended operation of SERT II starting in 1970. These results together with the technology employed on the early cesium engine flights. the Applications Technology Satellite (ATS) series, and the ground-test demonstrations, have provided the evolutionary path for the development of xenon ion thruster component technologies, control systems, and power circuit implementations. In the 1997-1999 period, the communication satellite flights using ion engine systems and the Deep Space I flight confirmed that these auxiliary and primary propulsion systems have advanced to a high-level of flight-readiness.

  15. Ion Propulsion Development Projects in US: Space Electric Rocket Test I to Deep Space 1

    NASA Technical Reports Server (NTRS)

    Sovey, James S.; Rawlin, Vincent K.; Patterson, Michael J.

    2001-01-01

    The historical background and characteristics of the experimental flights of ion propulsion systems and the major ground-based technology demonstrations are reviewed. The results of the first successful ion engine flight in 1964, Space Electric Rocket Test (SERT) I, which demonstrated ion beam neutralization, are discussed along with the extended operation of SERT II starting in 1970. These results together with the technologies employed on the early cesium engine flights, the applications technology satellite series, and the ground-test demonstrations, have provided the evolutionary path for the development of xenon ion thruster component technologies, control systems, and power circuit implementations. In the 1997-1999 period, the communication satellite flights using ion engine systems and the Deep Space 1 flight confirmed that these auxiliary and primary propulsion systems have advanced to a high level of flight readiness.

  16. SCRL-Model for Human Space Flight Operations Enterprise Supply Chain

    NASA Technical Reports Server (NTRS)

    Tucker, Brian

    2010-01-01

    Standard approach to evaluate and configure adaptable and sustainable program and mission supply chains at an enterprise level. End-to-end view. Total Lifecycle. Evaluate the readiness of the supply chain during the supply chain development phase.

  17. Flight Proofing Test Report for Abort Sensing and Control Unit Drawing No. 27-11111-821,

    DTIC Science & Technology

    8217 containing six rate gyro output detectors, thirteen pressure switch output detectors and associated circuitry needed to supply two ’ready-abort’ outputs as well as seventeen telemetry outputs. (Author)

  18. Badminton--Teaching Concepts.

    ERIC Educational Resources Information Center

    Gibbs, Marilyn J.

    1988-01-01

    Teaching four basic badminton concepts along with the usual basic skill shots allows players to develop game strategy awareness as well as mechanical skills. These four basic concepts are: (1) ready position, (2) flight trajectory, (3) early shuttle contact, and (4) camouflage. (IAH)

  19. The Relationship of Maternal and Infant Variables to School Readiness.

    ERIC Educational Resources Information Center

    Rubin, Rosalyn A.; And Others

    A prospective longitudinal investigation related 76 maternal and infant variables to performance on the Metropolitan Readiness Tests (MRT) at age six. The 1,245 study subjects have been followed since birth. Their distribution on measures of intelligence and socioeconomic status is essentially normal. Subjects with high MRT scores were found to…

  20. Career Profile: Flight Operations Engineer (Airborne Science) Matthew Berry

    NASA Image and Video Library

    2014-11-05

    Operations engineers at NASA's Armstrong Flight Research Center help to advance science, technology, aeronautics, and space exploration by managing operational aspects of a flight research project. They serve as the governing authority on airworthiness related to the modification, operation, or maintenance of specialized research or support aircraft so those aircraft can be flown safely without jeopardizing the pilots, persons on the ground or the flight test project. With extensive aircraft modifications often required to support new research and technology development efforts, operations engineers are key leaders from technical concept to flight to ensure flight safety and mission success. Other responsibilities of an operations engineer include configuration management, performing systems design and integration, system safety analysis, coordinating flight readiness activities, and providing real-time flight support. This video highlights the responsibilities and daily activities of NASA Armstrong operations engineer Matthew Berry during the preparation and execution of flight tests in support of aeronautics research. http://www.nasa.gov/centers/armstrong/home/ http://www.nasa.gov/

  1. Career Profile: Flight Operations Engineer (Aeronautics) Brian Griffin

    NASA Image and Video Library

    2014-10-17

    Operations engineers at NASA's Armstrong Flight Research Center help to advance science, technology, aeronautics, and space exploration by managing operational aspects of a flight research project. They serve as the governing authority on airworthiness related to the modification, operation, or maintenance of specialized research or support aircraft so those aircraft can be flown safely without jeopardizing the pilots, persons on the ground or the flight test project. With extensive aircraft modifications often required to support new research and technology development efforts, operations engineers are key leaders from technical concept to flight to ensure flight safety and mission success. Other responsibilities of an operations engineer include configuration management, performing systems design and integration, system safety analysis, coordinating flight readiness activities, and providing real-time flight support. This video highlights the responsibilities and daily activities of NASA Armstrong operations engineer Brian Griffin during the preparation and execution of flight tests in support of aeronautics research. http://www.nasa.gov/centers/armstrong/home/ http://www.nasa.gov/

  2. Saturn V First Stage (S-1C) Ready for Assembly AT KSC

    NASA Technical Reports Server (NTRS)

    1968-01-01

    This photograph shows the Saturn V first stage (S-1C) in the Vehicle Assembly Building at Kennedy Space Center ready to be mated with the second and third stages to complete the assembly of a Saturn V launch vehicle. This particular Saturn V was used for Apollo 6, which was a systems test flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  3. Late Talkers: A Population-Based Study of Risk Factors and School Readiness Consequences.

    PubMed

    Hammer, Carol Scheffner; Morgan, Paul; Farkas, George; Hillemeier, Marianne; Bitetti, Dana; Maczuga, Steve

    2017-03-01

    This study was designed to (a) identify sociodemographic, pregnancy and birth, family health, and parenting and child care risk factors for being a late talker at 24 months of age; (b) determine whether late talkers continue to have low vocabulary at 48 months; and (c) investigate whether being a late talker plays a unique role in children's school readiness at 60 months. We analyzed data from the Early Childhood Longitudinal Study, a population-based sample of 9,600 children. Data were gathered when the children were 9, 24, 48, and 60 months old. The risk of being a late talker at 24 months was significantly associated with being a boy, lower socioeconomic status, being a nonsingleton, older maternal age at birth, moderately low birth weight, lower quality parenting, receipt of day care for less than 10 hr/week, and attention problems. Being a late talker increased children's risk of having low vocabulary at 48 months and low school readiness at 60 months. Family socioeconomic status had the largest and most profound effect on children's school readiness. Limited vocabulary knowledge at 24 and 48 months is uniquely predictive of later school readiness. Young children with low vocabularies require additional supports prior to school entry.

  4. Psychometric evaluation of the Work Readiness Questionnaire in schizophrenia.

    PubMed

    Potkin, Steven G; Bugarski-Kirola, Dragana; Edgar, Chris J; Soliman, Sherif; Le Scouiller, Stephanie; Kunovac, Jelena; Miguel Velasco, Eugenio; Garibaldi, George M

    2016-04-01

    Unemployment can negatively impact quality of life among patients with schizophrenia. Employment status depends on ability, opportunity, education, and cultural influences. A clinician-rated scale of work readiness, independent of current work status, can be a valuable assessment tool. A series of studies were conducted to create and validate a Work Readiness Questionnaire (WoRQ) for clinicians to assess patient ability to engage in socially useful activity, independent of work availability. Content validity, test-retest and inter-rater reliability, and construct validity were evaluated in three separate studies. Content validity was supported. Cronbach's α was 0.91, in the excellent range. Clinicians endorsed WoRQ concepts, including treatment adherence, physical appearance, social competence, and symptom control. The final readiness decision showed good test-retest reliability and moderate inter-rater reliability. Work readiness was associated with higher function and lower levels of negative symptoms. Low positive and high negative predictive values confirmed the concept validity. The WoRQ has suitable psychometric properties for use in a clinical trial for patients with a broad range of symptom severity. The scale may be applicable to assess therapeutic interventions. It is not intended to assess eligibility for supported work interventions. The WoRQ is suitable for use in schizophrenia clinical trials to assess patient work functional potential.

  5. Military Readiness and Southern Sea Otter Conservation Act

    THOMAS, 112th Congress

    Rep. Gallegly, Elton [R-CA-24

    2012-02-15

    House - 07/17/2012 Reported (Amended) by the Committee on Natural Resources. H. Rept. 112-606, Part I. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  6. Design of an expert-system flight status monitor

    NASA Technical Reports Server (NTRS)

    Regenie, V. A.; Duke, E. L.

    1985-01-01

    The modern advanced avionics in new high-performance aircraft strains the capability of current technology to safely monitor these systems for flight test prior to their generalized use. New techniques are needed to improve the ability of systems engineers to understand and analyze complex systems in the limited time available during crucial periods of the flight test. The Dryden Flight Research Facility of NASA's Ames Research Center is involved in the design and implementation of an expert system to provide expertise and knowledge to aid the flight systems engineer. The need for new techniques in monitoring flight systems and the conceptual design of an expert-system flight status monitor is discussed. The status of the current project and its goals are described.

  7. KSC-2014-4160

    NASA Image and Video Library

    2014-09-30

    CAPE CANAVERAL, Fla. – Inside the Horizontal Integration Facility at Space Launch Complex 37 at Cape Canaveral Air Force Station in Florida, the Delta IV Heavy rocket is ready for rollout to the pad. The rocket is secured on the Elevated Platform Transporter for the trip to the pad. The Delta IV Heavy will launch Orion on Exploration Flight Test-1. During its first flight test, Orion will travel farther into space than any human spacecraft has gone in more than 40 years. The data gathered during the flight will influence design decisions, validate existing computer models and innovative new approaches to space systems development, as well as reduce overall mission risks and costs for later Orion flights. Liftoff of Orion on the first flight test is planned for December 2014. Photo credit: NASA/Dimitri Gerondidakis

  8. Readiness of hospitals to provide Kangaroo Mother Care (KMC) and documentation of KMC service delivery: Analysis of Malawi 2014 Emergency Obstetric and Newborn Care (EmONC) survey data

    PubMed Central

    Chavula, Kondwani; Likomwa, Dyson; Valsangkar, Bina; Luhanga, Richard; Chimtembo, Lydia; Dube, Queen; Gobezie, Wasihun Andualem; Guenther, Tanya

    2017-01-01

    Background Malawi introduced Kangaroo Mother Care (KMC) in 1999 as part of its efforts to address newborn morbidity and mortality and has continued to expand KMC services across the country. Yet, data on availability of KMC services and routine service provision are limited. Methods Data from the 2014 Emergency Obstetric Newborn Care (EmONC) survey, which was a census of all 87 hospitals in Malawi, were analyzed. The WHO service availability and readiness domains were used to generate indicators for KMC service readiness and an additional domain for documentation of KMC services was included. Levels of KMC service delivery were quantified using data extracted from a 12–month register review and a KMC initiation rate was calculated for each facility by dividing the reported number of babies initiated on KMC by the number of live births at facility. We defined three levels of KMC readiness and two levels of KMC operational status. Results 79% of hospitals (69/87) reported providing inpatient KMC services. More than half of the hospitals (62%; 54/87) met the most basic definition of readiness (staff, space for KMC and functional weighing scale) and 35% (30/87) met an expanded definition of readiness (guidelines, staff, space, scale and register in use). Only 15% (13/87) of hospitals had all KMC tracer items. Less than half of the hospitals (43%; 37/87) met criteria for KMC operational status at minimum levels (≥1/100 live births), and just 16% (14/87) met criteria for KMC operational status at routine levels (≥5/100 live births). Conclusions Our study found large differences between reported levels of KMC services and documented levels of KMC readiness and service provision among hospitals in Malawi. It is recommended that facility assessments of services such as KMC include record reviews to better estimate service availability and delivery. Further efforts to strengthen the capacity of Malawian hospitals to deliver KMC are needed. PMID:29085623

  9. An improved approach for flight readiness certification: Methodology for failure risk assessment and application examples. Volume 3: Structure and listing of programs

    NASA Technical Reports Server (NTRS)

    Moore, N. R.; Ebbeler, D. H.; Newlin, L. E.; Sutharshana, S.; Creager, M.

    1992-01-01

    An improved methodology for quantitatively evaluating failure risk of spaceflight systems to assess flight readiness and identify risk control measures is presented. This methodology, called Probabilistic Failure Assessment (PFA), combines operating experience from tests and flights with engineering analysis to estimate failure risk. The PFA methodology is of particular value when information on which to base an assessment of failure risk, including test experience and knowledge of parameters used in engineering analyses of failure phenomena, is expensive or difficult to acquire. The PFA methodology is a prescribed statistical structure in which engineering analysis models that characterize failure phenomena are used conjointly with uncertainties about analysis parameters and/or modeling accuracy to estimate failure probability distributions for specific failure modes. These distributions can then be modified, by means of statistical procedures of the PFA methodology, to reflect any test or flight experience. Conventional engineering analysis models currently employed for design of failure prediction are used in this methodology. The PFA methodology is described and examples of its application are presented. Conventional approaches to failure risk evaluation for spaceflight systems are discussed, and the rationale for the approach taken in the PFA methodology is presented. The statistical methods, engineering models, and computer software used in fatigue failure mode applications are thoroughly documented.

  10. Cross-Sectional Analysis of Commonly Prescribed Medications in Military Aviation.

    PubMed

    Ropp, Lincoln G; Haight, Sean P; Prudhomme, Michael B; Ropp, Elizabeth L

    2017-12-01

    Medication use by naval aviators, either prescription or over-the-counter, is not always relayed to the flight surgeon, resulting in unsafe flying environments. Many medications have debilitating effects that prohibit their use during aviation. Education and availability of resources on approved medications for flight status personnel is lacking. A retrospective search of the Department of Defense Composite Health Care System (DoD CHCS) was conducted from five geographic locations. Basic epidemiological information was obtained to determine the most common medications (N = 70) prescribed to active-duty flight status personnel. Analysis determined their medication category, flight status designation, and a generalized location comparison. A similar control medication list for nonflight status personnel was generated from one location. Analysis found that many medications prescribed to aviators are not approved for use in aviation and are similar to those of nonflight status personnel. There were 8 of the top 15 (53%) and 40 of the 70 (57%) most commonly prescribed medications of flight status personnel which were not approved. Similarly, 49% of total prescriptions (N = 15,652) were not approved. Little difference was found in medications among nonflight and flight status personnel, as 11 of the top 15 prescription medications (73%) were identical. This research demonstrates the need for education regarding certain medications and their prohibited use during flight. Results will provide the Flight Surgeon common medications prescribed to aviators to aid them in providing a safer flying environment.Ropp LG, Haight SP, Prudhomme MB, Ropp EL. Cross-sectional analysis of commonly prescribed medications in military aviation. Aerosp Med Hum Perform. 2017; 88(12):1129-1133.

  11. The Aerospace Safety Advisory panel's report to Doctor Robert A. Frosch, 1977

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Risks attendant to NASA's operations are identified for the following: mission operations; orbiter readiness for orbital flight tests; space shuttle main engine; avionics; thermal projection system; hazard assessment; human error. Past and future projects are assessed.

  12. Roentgen Satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    As result of the Challenger accident, the alternative possibility for launch of the ROSAT mission with an Atlas/Centaur launch vehicle is being considered. An overview of the problems involved in having the ROSAT flight ready for either a Shuttle or Atlas/Centaur launch is presented.

  13. STS-79 Commander William Readdy in White Room

    NASA Technical Reports Server (NTRS)

    1996-01-01

    STS-79 Commander William F. Readdy gets ready to climb into the flight deck of the Space Shuttle Atlantis at Launch Pad 39A. Assisting him are white room closeout crew members Travis Thompson (from left), Jean Alexander and Jim Davis.

  14. Every Child Ready for College or Career Act of 2013

    THOMAS, 113th Congress

    Sen. Alexander, Lamar [R-TN

    2013-06-06

    Senate - 06/06/2013 Read twice and referred to the Committee on Health, Education, Labor, and Pensions. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  15. Utah National Guard Readiness Act

    THOMAS, 112th Congress

    Rep. Bishop, Rob [R-UT-1

    2011-02-14

    Senate - 10/04/2011 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  16. Utah National Guard Readiness Act

    THOMAS, 111th Congress

    Rep. Bishop, Rob [R-UT-1

    2009-01-16

    Senate - 02/24/2009 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  17. VEGA Launch Vehicle Dynamic Environment: Flight Experience and Qualification Status

    NASA Astrophysics Data System (ADS)

    Di Trapani, C.; Fotino, D.; Mastrella, E.; Bartoccini, D.; Bonnet, M.

    2014-06-01

    VEGA Launch Vehicle (LV) during flight is equipped with more than 400 sensors (pressure transducers, accelerometers, microphones, strain gauges...) aimed to catch the physical phenomena occurring during the mission. Main objective of these sensors is to verify that the flight conditions are compliant with the launch vehicle and satellite qualification status and to characterize the phenomena that occur during flight. During VEGA development, several test campaigns have been performed in order to characterize its dynamic environment and identify the worst case conditions, but only with the flight data analysis is possible to confirm the worst cases identified and check the compliance of the operative life conditions with the components qualification status.Scope of the present paper is to show a comparison of the sinusoidal dynamic phenomena that occurred during VEGA first and second flight and give a summary of the launch vehicle qualification status.

  18. Income and Education as Predictors of Children's School Readiness. The Social Genome Project

    ERIC Educational Resources Information Center

    Isaacs, Julia; Magnuson, Katherine

    2011-01-01

    This study uses data from the Early Childhood Longitudinal Study-Birth (ECLS-B) Cohort to estimate associations between two important indicators of family socioeconomic status--family income and maternal education--and children's school readiness measured by academic skills, behavior, and physical health at school entry. We find large gaps in our…

  19. Solar Thermal Power Systems parabolic dish project

    NASA Technical Reports Server (NTRS)

    Truscello, V. C.

    1981-01-01

    The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.

  20. KSC-07pd0956

    NASA Image and Video Library

    2007-04-26

    KENNEDY SPACE CENTER, FLA. -- At the Kennedy Space Center Shuttle Landing Facility, a modified Boeing 727 aircraft owned by Zero Gravity Corp. is ready to take off with its well-known passenger, physicist Stephen Hawking. Zero Gravity Corp. is a commercial company licensed to provide the public with weightless flight experiences. Hawking will be making his first zero-gravity flight. Hawking developed amyotrophic lateral sclerosis disease in the 1960s, a type of motor neuron disease which would cost him the loss of almost all neuromuscular control. At the celebration of his 65th birthday on January 8 this year, Hawking announced his plans for a zero-gravity flight to prepare for a sub-orbital space flight in 2009 on Virgin Galactic's space service. Photo credit: NASA/Kim Shiflett

  1. STS-121: Discovery Entry Flight Director Post Landing Press Conference

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Steve Stitch, STS-121 Entry Flight Director, and Wayne Hale, Space Shuttle Program is shown in this post landing press conference. Steve Stitch begins with discussing the following topics: 1) Weather at Kennedy Space Center; 2) Gap filler protrusion; 3) De-orbit burn; 4) Space Shuttle Landing; 5) Global Position Satellite System (GPSS) performance; and 6) Post-landing rain showers. Wayne Hale discusses external tank observations at launch and the goals that were obtained by this flight, which are to deliver 4000 pounds of scientific equipment, increase the crew members to three on the International Space Station (ISS), and repair the ISS. Questions from the press on lessons learned from the Auxiliary Power Unit (APU) leak, and flight readiness reviews are addressed.

  2. Introduction: Prediction of F-16XL Flight Flow Physics

    NASA Technical Reports Server (NTRS)

    Lamar, John E.

    2009-01-01

    This special section is the result of fruitful endeavors by an international group of researchers in industry, government laboratories and university-led efforts to improve the technology readiness level of their CFD solvers through comparisons with flight data collected on the F-16XL-1 aircraft at a variety of test conditions. These 1996 flight data were documented and detailed the flight-flow physics of this aircraft through surface tufts and pressures, boundary-layer rakes and skin-friction measurements. The flight project was called the Cranked Wing Aerodynamics Project (CAWAP), due to its leading-edge sweep crank (70 degrees inboard, 50 degrees outboard), and served as a basis for the International comparisons to be made, called CAWAPI. This highly focused effort was one of two vortical flow studies facilitated by the NATO Research and Technology Organization through its Applied Vehicle Panel with a title of Understanding and Modeling Vortical Flows to Improve the Technology Readiness Level for Military Aircraft. It was given a task group number of AVT-113 and had an official start date of Spring 2003. The companion part of this task group dealt with fundamentals of vortical flow from both an experimental and numerical perspective on an analytically describable 65 degree delta-wing model for which much surface pressure data had already been measured at NASA Langley Research Center at a variety of Mach and Reynolds numbers and is called the Vortex Flow Experiment - 2 (VFE-2). These two parts or facets helped one another in understanding the predictions and data that had been or were being collected.

  3. 40 CFR Appendix III to Subpart S... - As-Received Inspection

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light... Reading 7. Build Date 8. MIL light on/off status 9. Readiness code status 10. Stored OBD codes 11.Any...

  4. Inside KSC! for May 18, 2018

    NASA Image and Video Library

    2018-05-18

    This week in space news, college students converge on the Kennedy Space Center Visitor Complex for the 9th annual Robotic Mining Competition, and the Advanced Plant Habitat base is readied for its flight to the International Space Station aboard the Orbital ATK Cygnus spacecraft.

  5. NASA Crew Launch Vehicle Flight Test Options

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles E., Jr.; Davis, Stephan R.; Robonson, Kimberly; Tuma, Margaret L.; Sullivan, Greg

    2006-01-01

    Options for development flight testing (DFT) of the Ares I Crew Launch Vehicle (CLV) are discussed. The Ares-I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to launch the Crew Exploration Vehicle (CEV) into low Earth Orbit (LEO). The Ares-I implements one of the components of the Vision for Space Exploration (VSE), providing crew and cargo access to the International Space Station (ISS) after retirement of the Space Shuttle and, eventually, forming part of the launch capability needed for lunar exploration. The role of development flight testing is to demonstrate key sub-systems, address key technical risks, and provide flight data to validate engineering models in representative flight environments. This is distinguished from certification flight testing, which is designed to formally validate system functionality and achieve flight readiness. Lessons learned from Saturn V, Space Shuttle, and other flight programs are examined along with key Ares-I technical risks in order to provide insight into possible development flight test strategies. A strategy for the first test flight of the Ares I, known as Ares I-1, is presented.

  6. First Spacelab flight - A status report of the joint ESA/NASA mission

    NASA Technical Reports Server (NTRS)

    Craft, H. G., Jr.; Sanfourche, J.-P.

    1978-01-01

    A general overview of the first Spacelab flight is presented and a table is given listing the payload composition. An accommodation study is presented with emphasis on the configuration, mass status, timeline, and experiment interface specifications. Also considered are flight and ground operations, safety factors, and payload specialists training for the first flight.

  7. High-Rate Wireless Airborne Network Demonstration (HiWAND) Flight Test Results

    NASA Technical Reports Server (NTRS)

    Franz, Russell

    2008-01-01

    An increasing number of flight research and airborne science experiments now contain network-ready systems that could benefit from a high-rate bidirectional air-to-ground network link. A prototype system, the High-Rate Wireless Airborne Network Demonstration, was developed from commercial off-the-shelf components while leveraging the existing telemetry infrastructure on the Western Aeronautical Test Range. This approach resulted in a cost-effective, long-range, line-of-sight network link over the S and the L frequency bands using both frequency modulation and shaped-offset quadrature phase-shift keying modulation. This report discusses system configuration and the flight test results.

  8. High-Rate Wireless Airborne Network Demonstration (HiWAND) Flight Test Results

    NASA Technical Reports Server (NTRS)

    Franz, Russell

    2007-01-01

    An increasing number of flight research and airborne science experiments now contain network-ready systems that could benefit from a high-rate bidirectional air-to-ground network link. A prototype system, the High-Rate Wireless Airborne Network Demonstration, was developed from commercial off-the-shelf components while leveraging the existing telemetry infrastructure on the Western Aeronautical Test Range. This approach resulted in a cost-effective, long-range, line-of-sight network link over the S and the L frequency bands using both frequency modulation and shaped-offset quadrature phase-shift keying modulation. This paper discusses system configuration and the flight test results.

  9. NASA's Space Launch System Advanced Booster Development

    NASA Technical Reports Server (NTRS)

    Robinson, Kimberly F.; Crumbly, Christopher M.; May, Todd A.

    2014-01-01

    The National Aeronautics and Space Administration's (NASA's) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for human space flight and scientific missions beyond Earth orbit. NASA is executing this development within flat budgetary guidelines by using existing engines assets and heritage technology to ready an initial 70 metric ton (t) lift capability for launch in 2017, and then employing a block upgrade approach to evolve a 130-t capability after 2021. A key component of the SLS acquisition plan is a three-phased approach for the first-stage boosters. The first phase is to expedite the 70-t configuration by completing development of the Space Shuttle heritage 5-segment solid rocket boosters (SRBs) for the initial flights of SLS. Since no existing boosters can meet the performance requirements for the 130-t class SLS, the next phases of the strategy focus on the eventual development of advanced boosters with an expected thrust class potentially double the current 5-segment solid rocket booster capability of 3.88 million pounds of thrust each. The second phase in the booster acquisition plan is the Advanced Booster Engineering Demonstration and/or Risk Reduction (ABEDRR) effort, for which contracts were awarded beginning in 2012 after a full and open competition, with a stated intent to reduce risks leading to an affordable advanced booster. NASA has awarded ABEDRR contracts to four industry teams, which are looking into new options for liquid-fuel booster engines, solid-fuel-motor propellants, and composite booster structures. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an advanced booster. This paper will discuss the status of this acquisition strategy and its results toward readying both the 70 t and 130 t configurations of SLS. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the advanced boosters. These new boosters will enable the flexible path approach to deep space exploration, opening up vast opportunities for human missions to near-Earth asteroids and Mars. This evolved capability will offer large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements.

  10. Endeavour, Orbiter Vehicle (OV) 105, roll out to KSC Launch Complex Pad 39B

    NASA Image and Video Library

    1992-03-13

    S92-34862 (13 March 1992) --- An otter, surprised by the unexpected presence of the photographer, seems unaware of the Space Shuttle Endeavour rolling behind it to Launch Pad 39B. Endeavour is the newest orbiter in the Shuttle fleet. Still ahead for Endeavour (OV-105) is a Flight Readiness Firing of its three main engines, and the Terminal Countdown Demonstration Test with the flight crew. Endeavour's maiden voyage on NASA's mission STS-49 will occur in late spring.

  11. KSC-01pp1023

    NASA Image and Video Library

    2001-05-24

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, a worker points to some of the tiles on orbiter Atlantis that are being dried by clusters of 200-300 watt heat lamps. Significant rainstorms during the orbiter’s turnaround for a ferry flight home from Edwards Air Force Base, Calif., caused a moisture problem. The tiles are part of the Thermal Protection System used on orbiters for extreme temperatures encountered during landing. Engineers are evaluating the current procedures to assure the tiles are in a safe and flight-ready condition

  12. KSC-01PP1024

    NASA Image and Video Library

    2001-05-24

    KENNEDY SPACE CENTER, FLA. -- In the Orbiter Processing Facility, a worker points to some of the tiles on orbiter Atlantis that are being dried by clusters of 200-300 watt heat lamps. Significant rainstorms during the orbiter’s turnaround for a ferry flight home from Edwards Air Force Base, Calif., caused a moisture problem. The tiles are part of the Thermal Protection System used on orbiters for extreme temperatures encountered during landing. Engineers are evaluating the current procedures to assure the tiles are in a safe and flight-ready condition

  13. Electromagnetic emission experiences using electric propulsion systems: A survey

    NASA Technical Reports Server (NTRS)

    Sovey, James S.; Zana, Lynnette M.; Knowles, Steven C.

    1987-01-01

    As electric propulsion systems become ready to integrate with spacecraft systems, the impact of propulsion system radiated emissions are of significant interest. Radiated emissions from electromagnetic, electrostatic, and electrothermal systems have been characterized and results synopsized from the literature describing 21 space flight programs. Electromagnetic radiated emission results from ground tests and flight experiences are presented with particular attention paid to the performance of spacecraft subsystems and payloads during thruster operations. The impacts to transmission of radio frequency signals through plasma plumes are also reviewed.

  14. NASA's B-52B launch aircraft takes off carrying the third X-43A hypersonic research vehicle on a captive carry evaluation flight September 27, 2004

    NASA Image and Video Library

    2004-09-27

    Attached to the same B-52B mothership that once launched X-15 research aircraft in the 1960s, NASA's third X-43A performed a captive carry evaluation flight from Edwards Air Force Base, California on September 27, 2004. The X-43 remained mated to the B-52 throughout this mission, intended to check its readiness for launch scheduled later in the fall.

  15. Preliminary performance of a vertical-attitude takeoff and landing, supersonic cruise aircraft concept having thrust vectoring integrated into the flight control system

    NASA Technical Reports Server (NTRS)

    Robins, A. W.; Beissner, F. L., Jr.; Domack, C. S.; Swanson, E. E.

    1985-01-01

    A performance study was made of a vertical attitude takeoff and landing (VATOL), supersonic cruise aircraft concept having thrust vectoring integrated into the flight control system. Those characteristics considered were aerodynamics, weight, balance, and performance. Preliminary results indicate that high levels of supersonic aerodynamic performance can be achieved. Further, with the assumption of an advanced (1985 technology readiness) low bypass ratio turbofan engine and advanced structures, excellent mission performance capability is indicated.

  16. KSC-00pp0773

    NASA Image and Video Library

    2000-06-17

    In the Space Shuttle Processing Facility, workers get ready to attach cables to a high-gain antenna that will be lifted and attached to the Integrated Truss Structure (ITS) Z1. The Z1, part of the payload on mission STS-92 (flight 3A) to be launched in mid-fall, is an early exterior framework for the International Space Station. It will allow the first U.S. solar arrays, on mission STS-97 (flight 4A), to be temporarily installed on Unity for early power

  17. X-33

    NASA Image and Video Library

    2004-04-15

    Pictured here is an artist's concept of the experimental X-33 in-flight. The X-33 program was designed to pave the way to a full-scale commercially developed, reusable launch vehicle (RLV). The program that will put the U.S. on a path toward safe, affordable, reliable access to space by providing the latest technology was ready for space flight. The X-33 is the flagship technology demonstrator for technologies that will dramatically lower the cost of access to space. The X-33 program was cancelled in 2001.

  18. Saturn V First Stage S-1C LOX Fuel Tanks

    NASA Technical Reports Server (NTRS)

    1960-01-01

    This photograph shows the Saturn V assembled LOX (Liquid Oxygen) and fuel tanks ready for transport from the Manufacturing Engineering Laboratory at Marshall Space Flight Center in Huntsville, Alabama. The tanks were then shipped to the launch site at Kennedy Space Center for a flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  19. Flight Testing of the Space Launch System (SLS) Adaptive Augmenting Control (AAC) Algorithm on an F/A-18

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.; VanZwieten, Tannen S.; Hanson, Curtis E.; Wall, John H.; Miller, Chris J.; Gilligan, Eric T.; Orr, Jeb S.

    2014-01-01

    The Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an adaptive augmenting control (AAC) algorithm for launch vehicles that improves robustness and performance on an as-needed basis by adapting a classical control algorithm to unexpected environments or variations in vehicle dynamics. This was baselined as part of the Space Launch System (SLS) flight control system. The NASA Engineering and Safety Center (NESC) was asked to partner with the SLS Program and the Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP) to flight test the AAC algorithm on a manned aircraft that can achieve a high level of dynamic similarity to a launch vehicle and raise the technology readiness of the algorithm early in the program. This document reports the outcome of the NESC assessment.

  20. Early Academic Achievement Among American Low-Income Black Students from Immigrant and Non-Immigrant Families

    PubMed Central

    Calzada, Esther; Barajas-Gonzalez, R. Gabriela; Dawson-McClure, Spring; Huang, Keng-Yen; Palamar, Joseph; Kamboukos, Dimitra

    2015-01-01

    At least half of the well-documented achievement gap for low-income Black children is already present in kindergarten, due in part to limited opportunities for acquiring foundational skills necessary for school success. There is some evidence that low-income minority children from immigrant families have more positive outcomes than their non-immigrant counterparts, although little is known about how the immigrant paradox may manifest in young children. This study examines foundational school readiness skills (academic and social-emotional learning) at entry into pre-kindergarten (pre-k) and achievement in kindergarten and second grade among Black children from low-income immigrant and non-immigrant families (N=299). Immigrant and non-immigrant children entered pre-k with comparable readiness scores; in both groups, reading scores decreased significantly from kindergarten to second grade and math scores decreased significantly for non-immigrant children and marginally for immigrant children. Regardless of immigrant status, pre-k school readiness and pre-k classroom quality were associated with elementary school achievement. However, declines in achievement scores were not as steep for immigrant children and several predictive associations were moderated by immigrant status, such that among those with lower pre-k school readiness or in lower quality classrooms, immigrant children had higher achievement test scores than children from non-immigrant families. Findings suggest that immigrant status provides young Black students with some protection against individual- and classroom-level risk factors for early underachievement in elementary school. PMID:26048254

  1. Current Status and Readiness on In-Situ Exploration of Asteroid Surface by MINERVA Rover in Hayabusa Mission

    NASA Astrophysics Data System (ADS)

    Yoshimitsu, T.; Sasaki, S.; Yanagisawa, M.

    2005-03-01

    This paper describes the current status of the MINERVA rover boarded on the Japanese asteroid explorer Hayabusa. Also the plan and the strategy to acquire surface images of the asteroid are presented.

  2. Small Business Disaster Readiness and Reform Act of 2009

    THOMAS, 111th Congress

    Rep. Griffith, Parker [D-AL-5

    2009-10-07

    Senate - 11/09/2009 Received in the Senate and Read twice and referred to the Committee on Small Business and Entrepreneurship. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  3. Impact of daily consumption of iron fortified ready-to-eat cereal and pumpkin seed kernels (Cucurbita pepo) on serum iron in adult women.

    PubMed

    Naghii, Mohammad Reza; Mofid, Mahmood

    2007-01-01

    Iron deficiency, anemia, is the most prevalent nutritional problem in the world today. The objective of this study was to consider the effectiveness of consumption of iron fortified ready-to-eat cereal and pumpkin seed kernels as two sources of dietary iron on status of iron nutrition and response of hematological characteristics of women at reproductive ages. Eight healthy female, single or non pregnant subjects, aged 20-37 y consumed 30 g of iron fortified ready-to-eat cereal (providing 7.1 mg iron/day) plus 30 g of pumpkin seed kernels (providing 4.0 mg iron/day) for four weeks. Blood samples collected on the day 20 of menstrual cycles before and after consumption and indices of iron status such as reticulocyte count, hemoglobin (Hb), hematocrit (Ht), serum ferritin, iron, total iron-binding capacity (TIBC), transferrin and transferrin saturation percent were determined. Better response for iron status was observed after consumption period. The statistical analysis showed a significant difference between the pre and post consumption phase for higher serum iron (60 +/- 22 vs. 85 +/- 23 ug/dl), higher transferrin saturation percent (16.8 +/- 8.0 vs. 25.6 +/- 9.0%), and lower TIBC (367 +/- 31 vs. 339 +/- 31 ug/dl). All individuals had higher serum iron after consumption. A significant positive correlation (r=0.981, p=0.000) between the differences in serum iron levels and differences in transferrin saturation percentages and a significant negative correlation (r=-0.916, p<0.001) between the differences in serum iron levels and differences in TIBC was found, as well. Fortified foods contribute to maintaining optimal nutritional status and minimizing the likelihood of iron insufficiencies and use of fortified ready-to-eat cereals is a common strategy. The results showed that adding another food source of iron such as pumpkin seed kernels improves the iron status. Additional and longer studies using these two food products are recommended to further determine the effect of iron fortification on iron nutrition and status among the target population, and mainly in young children, adolescents, women of reproductive ages and pregnant women.

  4. Temperament, Select Home Environment Characteristics and Reading Readiness as Predictors of Reading Progress.

    ERIC Educational Resources Information Center

    Brown, T.J.

    Progress in a primary-grade reading program was determined for 106 first-born, second-grade students at the end of the school year. Previous data available for this sample included Thomas-Chase-Birch temperament ratings, family intactness and socioeconomic status at age four, and Metropolitan Readiness Test scores at age six. The value of these…

  5. The Influence of Dual Enrollment on Academic Performance and College Readiness: Differences by Socioeconomic Status

    ERIC Educational Resources Information Center

    An, Brian P.

    2013-01-01

    I examine the influence of dual enrollment, a program that allows students to take college courses and earn college credits while in high school, on academic performance and college readiness. Advocates consider dual enrollment as a way to transition high school students into college, and they further claim that these programs benefit students…

  6. STS-92 Mission Specialist Wakata gets ready to drive the M-113

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Getting ready to take his turn at the wheel of the M-113 is Mission Specialist Koichi Wakata of Japan. Behind him can be seen Mission Specialists Bill McArthur (left) and Leroy Chiao (right), who wait their turns. Learning to drive the armored vehicle is part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter's payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.

  7. STS-92 Mission Specialist McArthur is ready to take his turn driving the M-113

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-92 Mission Specialist Bill McArthur gets ready to take his turn at driving the M-113, part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. Behind him (left) is Mission Specialist Jeff Wisoff, waiting his turn to drive along with other unidentified crew members. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter's payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.

  8. KENNEDY SPACE CENTER, FLA. - At the InDyne Inc. booth during the 40th Space Congress, Frank Kiep is ready to meet visitors. Held April 29-May 2, 2003, in Cape Canaveral, Fla., the Space Congress is an international conference that gathers attendees from the scientific community, the space industry workforce, educators and local supporting industries. This year's event commemorated the 40th anniversary of the Kennedy Space Center and the Centennial of Flight. The theme for the Space Congress was "Linking the Past to the Future: A Celebration of Space."

    NASA Image and Video Library

    2003-04-30

    KENNEDY SPACE CENTER, FLA. - At the InDyne Inc. booth during the 40th Space Congress, Frank Kiep is ready to meet visitors. Held April 29-May 2, 2003, in Cape Canaveral, Fla., the Space Congress is an international conference that gathers attendees from the scientific community, the space industry workforce, educators and local supporting industries. This year's event commemorated the 40th anniversary of the Kennedy Space Center and the Centennial of Flight. The theme for the Space Congress was "Linking the Past to the Future: A Celebration of Space."

  9. In-Space Propulsion Program Overview and Status

    NASA Technical Reports Server (NTRS)

    Wercinski, Paul F.; Johnson, Les; Baggett, Randy M.

    2003-01-01

    NASA's In-Space Propulsion (ISP) Program is designed to develop advanced propulsion technologies that can enable or greatly enhance near and mid-term NASA science missions by significantly reducing cost, mass, and/or travel times. These technologies include: Solar Electric Propulsion, Aerocapture, Solar Sails, Momentum Exchange Tethers, Plasma Sails and other technologies such as Advanced Chemical Propulsion. The ISP Program intends to develop cost-effective propulsion technologies that will provide a broad spectrum of mission possibilities, enabling NASA to send vehicles on longer, more useful voyages and in many cases to destinations that were previously unreachable using conventional means. The ISP approach to identifying and prioritizing these most promising technologies is to use mission and system analysis and subsequent peer review. The ISP program seeks to develop technologies under consideration to Technology Readiness Level (TRL) -6 for incorporation into mission planning within 3-5 years of initiation. The NASA TRL 6 represents a level where a technology is ready for system level demonstration in a relevant environment, usually a space environment. In addition, maximum use of open competition is encouraged to seek optimum solutions under ISP. Several NASA Research Announcements (NRA's) have been released asking industry, academia and other organizations to propose propulsion technologies designed to improve our ability to conduct scientific study of the outer planets and beyond. The ISP Program is managed by NASA Headquarters Office of Space Science and implemented by the Marshall Space Flight Center in Huntsville, Alabama.

  10. Review of X-43A Return to Flight Activities and Current Status

    NASA Technical Reports Server (NTRS)

    Reubush, David E.; Nguyen, Luat T.; Rausch, Vincent L.

    2004-01-01

    This paper provides an overview and status of the return to flight activities for the X-43A scramjet flight demonstrator after the first flight mishap. The first flight was attempted on June 2, 2001 and resulted in vehicle destruction by range safety when the booster went out of control early in the flight. In the time since the mishap much work has been done to examine the causes of the failure and make modifications to the booster to insure that the boost for the second flight will be successful. In addition, all other aspects of the flight have been examined to maximize the probability of a successful flight.

  11. New Suborbital Flight Opportunities and Funding

    NASA Astrophysics Data System (ADS)

    Saltman, Alexander

    2013-07-01

    New opportunities for suborbital research are on the horizon. Reusable suborbital vehicles will offer immediate and routine space access for scientific payloads, provide access to altitudes around 100 kilometers, create opportunities for low-cost monitoring of upper atmospheric phenomena, as well as small scale solar observation. Reduced operational cost and quick turn-around will enable equipment to be flown opportunistically, in response to specific solar activity, or in continuous test and improvement cycles. Suborbital test flights will also provide opportunities to test prospective satellite instruments in an extended microgravity environment before being launched to orbit, raising the technology readiness level (TRL) of flight hardware and reducing the risk of anomalies during missions. I discuss the capabilities of emerging suborbital vehicles, payload and integration requirements, and funding opportunities for suborbital flights at NASA.

  12. Consumer behaviors towards ready-to-eat foods based on food-related lifestyles in Korea

    PubMed Central

    Bae, Hyun-Joo; Chae, Mi-Jin

    2010-01-01

    The purpose of this study was to examine consumers' behaviors toward ready-to-eat foods and to develop ready-to-eat food market segmentation in Korea. The food-related lifestyle and purchase behaviors of ready-to-eat foods were evaluated using 410 ready-to-eat food consumers in the Republic of Korea. Four factors were extracted by exploratory factor analysis (health-orientation, taste-orientation, convenience-orientation, and tradition-orientation) to explain the ready-to eat food consumers' food-related lifestyles. The results of cluster analysis indicated that "tradition seekers" and "convenience seekers" should be regarded as the target segments. Chi-square tests and t-tests of the subdivided groups showed there were significant differences across marital status, education level, family type, eating-out expenditure, place of purchase, and reason for purchase. In conclusion, the tradition seekers consumed more ready-to-eat foods from discount marts or specialty stores and ate them between meals more often than the convenience seekers. In contrast, the convenience seekers purchased more ready-to-eat foods at convenience stores and ate them as meals more often than the tradition seekers. These findings suggest that ready-to-eat food market segmentation based on food-related lifestyles can be applied to develop proper marketing strategies. PMID:20827350

  13. Consumer behaviors towards ready-to-eat foods based on food-related lifestyles in Korea.

    PubMed

    Bae, Hyun-Joo; Chae, Mi-Jin; Ryu, Kisang

    2010-08-01

    The purpose of this study was to examine consumers' behaviors toward ready-to-eat foods and to develop ready-to-eat food market segmentation in Korea. The food-related lifestyle and purchase behaviors of ready-to-eat foods were evaluated using 410 ready-to-eat food consumers in the Republic of Korea. Four factors were extracted by exploratory factor analysis (health-orientation, taste-orientation, convenience-orientation, and tradition-orientation) to explain the ready-to eat food consumers' food-related lifestyles. The results of cluster analysis indicated that "tradition seekers" and "convenience seekers" should be regarded as the target segments. Chi-square tests and t-tests of the subdivided groups showed there were significant differences across marital status, education level, family type, eating-out expenditure, place of purchase, and reason for purchase. In conclusion, the tradition seekers consumed more ready-to-eat foods from discount marts or specialty stores and ate them between meals more often than the convenience seekers. In contrast, the convenience seekers purchased more ready-to-eat foods at convenience stores and ate them as meals more often than the tradition seekers. These findings suggest that ready-to-eat food market segmentation based on food-related lifestyles can be applied to develop proper marketing strategies.

  14. Russian Space Suits ready

    NASA Image and Video Library

    2014-08-17

    ISS040-E-095609 (17 Aug. 2014) --- Unoccupied Russian Orlan spacesuits for Russian cosmonauts Oleg Artemyev (blue stripes) and Alexander Skvortsov (red stripes), both Expedition 40 flight engineers, are pictured in the Pirs Docking Compartment of the International Space Station on the eve of the spacewalk scheduled for Aug. 18, 2014.

  15. Russian Space Suits ready

    NASA Image and Video Library

    2014-08-17

    ISS040-E-095619 (17 Aug. 2014) --- Unoccupied Russian Orlan spacesuits for Russian cosmonauts Oleg Artemyev (blue stripes) and Alexander Skvortsov (red stripes), both Expedition 40 flight engineers, are pictured in the Pirs Docking Compartment of the International Space Station on the eve of the spacewalk scheduled for Aug. 18, 2014.

  16. Russian Space Suits ready

    NASA Image and Video Library

    2014-08-17

    ISS040-E-095615 (17 Aug. 2014) --- Unoccupied Russian Orlan spacesuits for Russian cosmonauts Oleg Artemyev (blue stripes) and Alexander Skvortsov (red stripes), both Expedition 40 flight engineers, are pictured in the Pirs Docking Compartment of the International Space Station on the eve of the spacewalk scheduled for Aug. 18, 2014.

  17. Russian Space Suits ready

    NASA Image and Video Library

    2014-08-17

    ISS040-E-095617 (17 Aug. 2014) --- Unoccupied Russian Orlan spacesuits for Russian cosmonauts Oleg Artemyev (blue stripes) and Alexander Skvortsov (red stripes), both Expedition 40 flight engineers, are pictured in the Pirs Docking Compartment of the International Space Station on the eve of the spacewalk scheduled for Aug. 18, 2014.

  18. Russian Space Suits ready

    NASA Image and Video Library

    2014-08-17

    ISS040-E-095612 (17 Aug. 2014) --- Unoccupied Russian Orlan spacesuits for Russian cosmonauts Oleg Artemyev (blue stripes) and Alexander Skvortsov (red stripes), both Expedition 40 flight engineers, are pictured in the Pirs Docking Compartment of the International Space Station on the eve of the spacewalk scheduled for Aug. 18, 2014.

  19. Synergistic Allocation of Flight Expertise on the Flight Deck (SAFEdeck): A Design Concept to Combat Mode Confusion, Complacency, and Skill Loss in the Flight Deck

    NASA Technical Reports Server (NTRS)

    Schutte, Paul; Goodrich, Kenneth; Williams, Ralph

    2016-01-01

    This paper presents a new design and function allocation philosophy between pilots and automation that seeks to support the human in mitigating innate weaknesses (e.g., memory, vigilance) while enhancing their strengths (e.g., adaptability, resourcefulness). In this new allocation strategy, called Synergistic Allocation of Flight Expertise in the Flight Deck (SAFEdeck), the automation and the human provide complementary support and backup for each other. Automation is designed to be compliant with the practices of Crew Resource Management. The human takes a more active role in the normal operation of the aircraft without adversely increasing workload over the current automation paradigm. This designed involvement encourages the pilot to be engaged and ready to respond to unexpected situations. As such, the human may be less prone to error than the current automation paradigm.

  20. Liability and Insurance for Suborbital Flights

    NASA Astrophysics Data System (ADS)

    Masson-Zwaan, T.

    2012-01-01

    This paper analyzes and compares liability and liability insurance in the fields of aviation and spaceflight in order to propose solutions for a liability regime and insurance options for suborbital flights. Suborbital flights can be said to take place in the grey zone between air and space, between air law and space law, as well as between aviation insurance and space insurance. In terms of liability, the paper discusses air law and space law provisions in the fields of second and third party liability for damage to passengers and 'innocent bystanders' respectively, touching upon international treaties, national law and EU law, and on insurance to cover those risks. Although the insurance market is currently not ready to provide tailor-made products for operators of suborbital flights, it is expected to adapt rapidly once such flights will become reality. A hybrid approach will provide the best solution in the medium term.

  1. Air STAR Beyond Visual Range UAS Description and Preliminary Test Results

    NASA Technical Reports Server (NTRS)

    Cunningham, Kevin; Cox, David E.; Foster, John V.; Riddick, Stephen E.; Laughter, Sean A.

    2016-01-01

    The NASA Airborne Subscale Transport Aircraft Research Unmanned Aerial System project's capabilities were expanded by updating the system design and concept of operations. The new remotely piloted airplane system design was flight tested to assess integrity and operational readiness of the design to perform flight research. The purpose of the system design is to improve aviation safety by providing a capability to validate, in high-risk conditions, technologies to prevent airplane loss of control. Two principal design requirements were to provide a high degree of reliability and that the new design provide a significant increase in test volume (relative to operations using the previous design). The motivation for increased test volume is to improve test efficiency and allow new test capabilities that were not possible with the previous design and concept of operations. Three successful test flights were conducted from runway 4-22 at NASA Goddard Space Flight Center's Wallops Flight Facility.

  2. Managing Military Readiness

    DTIC Science & Technology

    2017-02-01

    that status is likely to change over time. Furthermore, it provides the best shot at identifying effective management policies to ensure that DOD can...effectiveness of the oversight and the validity of redirected funding during periods of such scarce resources must be based on a clear foundation. Dollars...miscast on bad information undercuts the role of strategic managers and corrupts overall department readiness. This is why this subject is so vital. 2

  3. Unit Reconstitutions: Combat Stress as an Indicator of Unit Effectiveness

    DTIC Science & Technology

    2014-06-13

    Soldier and unit readiness by- A. Enhancing adaptive stress reactions. B. Preventing maladaptive stress reactions. 8 C. Assisting Soldiers with......and intensity of the most recent combat experience. 4. Physical condition of the soldiers. This includes their nutritional status, number and status

  4. Geomagnetically induced currents: Science, engineering, and applications readiness

    NASA Astrophysics Data System (ADS)

    Pulkkinen, A.; Bernabeu, E.; Thomson, A.; Viljanen, A.; Pirjola, R.; Boteler, D.; Eichner, J.; Cilliers, P. J.; Welling, D.; Savani, N. P.; Weigel, R. S.; Love, J. J.; Balch, C.; Ngwira, C. M.; Crowley, G.; Schultz, A.; Kataoka, R.; Anderson, B.; Fugate, D.; Simpson, J. J.; MacAlester, M.

    2017-07-01

    This paper is the primary deliverable of the very first NASA Living With a Star Institute Working Group, Geomagnetically Induced Currents (GIC) Working Group. The paper provides a broad overview of the current status and future challenges pertaining to the science, engineering, and applications of the GIC problem. Science is understood here as the basic space and Earth sciences research that allows improved understanding and physics-based modeling of the physical processes behind GIC. Engineering, in turn, is understood here as the "impact" aspect of GIC. Applications are understood as the models, tools, and activities that can provide actionable information to entities such as power systems operators for mitigating the effects of GIC and government agencies for managing any potential consequences from GIC impact to critical infrastructure. Applications can be considered the ultimate goal of our GIC work. In assessing the status of the field, we quantify the readiness of various applications in the mitigation context. We use the Applications Readiness Level (ARL) concept to carry out the quantification.

  5. Geomagnetically induced currents: Science, engineering, and applications readiness

    USGS Publications Warehouse

    Pulkkinen, Antti; Bernabeu, E.; Thomson, A.; Viljanen, A.; Pirjola, R.; Boteler, D.; Eichner, J.; Cilliers, P.J.; Welling, D.; Savani, N.P.; Weigel, R.S.; Love, Jeffrey J.; Balch, Christopher; Ngwira, C.M.; Crowley, G.; Schultz, Adam; Kataoka, R.; Anderson, B.; Fugate, D.; Simpson, J.J.; MacAlester, M.

    2017-01-01

    This paper is the primary deliverable of the very first NASA Living With a Star Institute Working Group, Geomagnetically Induced Currents (GIC) Working Group. The paper provides a broad overview of the current status and future challenges pertaining to the science, engineering, and applications of the GIC problem. Science is understood here as the basic space and Earth sciences research that allows improved understanding and physics-based modeling of the physical processes behind GIC. Engineering, in turn, is understood here as the “impact” aspect of GIC. Applications are understood as the models, tools, and activities that can provide actionable information to entities such as power systems operators for mitigating the effects of GIC and government agencies for managing any potential consequences from GIC impact to critical infrastructure. Applications can be considered the ultimate goal of our GIC work. In assessing the status of the field, we quantify the readiness of various applications in the mitigation context. We use the Applications Readiness Level (ARL) concept to carry out the quantification.

  6. SpaceX Falcon Heavy Demo Flight - Ready for Launch

    NASA Image and Video Library

    2018-02-06

    A SpaceX Falcon Heavy stands at Launch Complex 39A, far right, at NASA's Kennedy Space Center in Florida awaiting liftoff on its demonstration flight. In the foreground is the center’s iconic Vehicle Assembly Building. The demonstration flight is a significant milestone for the world's premier multi-user spaceport. In 2014, NASA signed a property agreement with SpaceX for the use and operation of the center's pad 39A, where the company has launched Falcon 9 rockets and is preparing for the first Falcon Heavy. NASA also has Space Act Agreements in place with partners, such as SpaceX, to provide services needed to process and launch rockets and spacecraft.

  7. From Research to Flight: Thinking About Implementation While Performing Fundamental Research

    NASA Technical Reports Server (NTRS)

    Johnson, Les

    2010-01-01

    This slide presentation calls for a strategy to implement new technologies. Such a strategy would allow advanced space transportation technologies to mature for exploration beyond Earth orbit. It discusses the difference between technology push versus technology pull. It also reviews the three basic technology readiness levels (TRL). The presentation traces examples of technology development to flight application: the Space Shuttle Main Engine Advanced Health Management System, the Friction Stir Welding technology the (auto-adjustable pin tool). A couple of technologies currently not in flight, but are being reviewed for potential use are: cryogenic fluid management (CFM), and solar sail propulsion. There is also an attempt to explain why new technologies are so difficult to field.

  8. Tactically Extensible and Modular Communications X-Band TEMCOM-X

    NASA Technical Reports Server (NTRS)

    Sims, William H.

    2015-01-01

    This paper will discuss a CubeSat size (3U) telemetry system concept being developed at Marshall Space Flight Center (MSFC) in cooperation with the U.S. Department of the Army and Dynetics Corporation. This telemetry system incorporates efficient, high-bandwidth communications by developing flight-ready, low-cost, Proto-flight software defined radio (SDR) and Electronically Steerable Patch Array (ESPA) antenna subsystems for use on platforms as small as CubeSats and unmanned aircraft systems (UASs). Higher bandwidth capacity will enable high-volume, low error-rate data transfer to and from tactical forces or sensors operating in austere locations (e.g., direct imagery download, unattended ground sensor data exfiltration, interlink communications).

  9. Behavioral Health and Performance Operations at the NASA Johnson Space Center: A Comprehensive Program that Addresses Flight and Spaceflight Duty Adaptability

    NASA Technical Reports Server (NTRS)

    Beven, G. E.

    2017-01-01

    NASA astronauts on active status require medical certification for aircraft flying duties as well as readiness for long duration spaceflight training, launch to the International Space Station (ISS), and mission continuation during spaceflight operations. Behavioral fitness and adaptability is an inherent component of medical certification at NASA and requires a unique approach that spans the professional life-span of all active astronauts. TOPIC: This presentation will address the Behavioral Health and Performance (BHP) operations program at the Johnson Space Center. Components of BHP operations include astronaut selection, as well as annual, elective, preflight, inflight, and postflight BHP assessments. Each aspect of the BHP operations program will be discussed, with a focus on behavioral fitness determination and resultant outcomes. Specifically, astronaut selection generates a rating of suitability for long duration spaceflight as well as psychiatric qualification; annual, preflight and postflight BHP assessments provoke a decision regarding the presence of any aeromedical concerns; and inflight assessment requires a conclusion pertaining to mission impact. The combination of these elements provide for a unique, comprehensive approach to flight and spaceflight adaptability. APPLICATIONS: Attendees will understand the differing facets of NASA's comprehensive BHP operations program that occurs over the course of an astronaut's career and be able to compare and contrast this to the Adaptability Rating for Military Aviation (ARMA) and proposed models presented by others on this panel.

  10. Factors Associated with Smoking in HIV-Infected Patients and Potential Barriers to Cessation

    PubMed Central

    Kesari, Ravi K.; Glesby, Marshall J.

    2013-01-01

    Abstract Smoking is common in patients with HIV and is associated with increased morbidity and mortality. With the goal of targeting future cessation interventions, we sought to identify factors associated with smoking status, readiness and confidence in cessation, and success in quitting. As part of a larger study in New York City assessing predictors of chronic obstructive pulmonary disease (COPD), we enrolled HIV-infected subjects at least 35 years of age without known asthma or COPD. Current smokers received detailed tobacco history, and smoking status was assessed by chart review at 3 and 6 months post-enrollment. Two hundred subjects were enrolled (29% current smokers, 31.5% never smokers, 39.5% former smokers, mean age of 49, 84% male, 64% had AIDS, and 97% were receiving antiretroviral therapy). Current smokers had higher unemployment and increased rates of other substance use than former smokers or never smokers. In multivariate analysis, being unemployed and having used inhalant drugs were associated with current smoking. Substance abuse history was not correlated with readiness to quit or patient estimated cessation. Lower education was associated with decreased readiness to quit. Follow-up smoking status for baseline current smokers was available for 47/58 enrollees at 6 months; 4 (9%) stopped smoking completely, and 17 (36%) decreased the number of packs-per-day. Smoking and concomitant substance abuse is common in HIV, and special attention should be given to this issue, in addition to a patient's readiness to quit, when implementing tobacco cessation protocols, especially in busy urban HIV care centers. PMID:24138488

  11. Barratt in the A/L during EVA-3 Preparation

    NASA Image and Video Library

    2009-07-22

    S127-E-007698 (22 July 2009) --- Astronaut Mike Barratt, Expedition 20 flight engineer, assumes a waiting stance in the International Space Station's Quest airlock while assisting astronauts Dave Wolf and Christopher Cassidy in getting ready for the mission's third space walk to perform work on the orbital outpost.

  12. The SHEFEX II Thermal Protection System

    NASA Astrophysics Data System (ADS)

    Bohrk, H.; Elsaber, H.; Weihs, H.

    2011-05-01

    The SHEFEXII payload tip is ready for flight. Within a period of three years, the experiment has been designed, laid out, parts have been manufactured, mounted and instrumented for the upcoming flight in autumn 2011. The present paper gives an overview over the thermal protection system (TPS) of the SHEFEX II vehicle including the TPS-material, the overall TPS-setup, and detailed informations on the faceted ther- mal protection including the gap seal, the sharp leading edge, the transpiration-cooling experiment AKTIV, and the aerodynamic control surfaces, i.e. canards.

  13. NSTAR Ion Thrusters and Power Processors

    NASA Technical Reports Server (NTRS)

    Bond, T. A.; Christensen, J. A.

    1999-01-01

    The purpose of the NASA Solar Electric Propulsion Technology Applications Readiness (NSTAR) project is to validate ion propulsion technology for use on future NASA deep space missions. This program, which was initiated in September 1995, focused on the development of two sets of flight quality ion thrusters, power processors, and controllers that provided the same performance as engineering model hardware and also met the dynamic and environmental requirements of the Deep Space 1 Project. One of the flight sets was used for primary propulsion for the Deep Space 1 spacecraft which was launched in October 1998.

  14. Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles

    2008-01-01

    NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

  15. NASA Aerospace Flight Battery Systems Program Update

    NASA Technical Reports Server (NTRS)

    Manzo, Michelle; ODonnell, Patricia

    1997-01-01

    The objectives of NASA's Aerospace Flight Battery Systems Program is to: develop, maintain and provide tools for the validation and assessment of aerospace battery technologies; accelerate the readiness of technology advances and provide infusion paths for emerging technologies; provide NASA projects with the required database and validation guidelines for technology selection of hardware and processes relating to aerospace batteries; disseminate validation and assessment tools, quality assurance, reliability, and availability information to the NASA and aerospace battery communities; and ensure that safe, reliable batteries are available for NASA's future missions.

  16. Banks of lights dry tiles on Atlantis

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- In the Orbiter Processing Facility, a worker points to some of the tiles on orbiter Atlantis that are being dried by clusters of 200-300 watt heat lamps. Significant rainstorms during the orbiter'''s turnaround for a ferry flight home from Edwards Air Force Base, Calif., caused a moisture problem. The tiles are part of the Thermal Protection System used on orbiters for extreme temperatures encountered during landing. Engineers are evaluating the current procedures to assure the tiles are in a safe and flight-ready condition.

  17. Elevated blood lead levels and reading readiness at the start of kindergarten.

    PubMed

    McLaine, Pat; Navas-Acien, Ana; Lee, Rebecca; Simon, Peter; Diener-West, Marie; Agnew, Jacqueline

    2013-06-01

    To evaluate the relationship between blood lead levels (BLLs) and reading readiness at kindergarten entry, an early marker of school performance, in a diverse urban school population. Kindergarten reading readiness test scores for children attending public kindergarten in Providence, Rhode Island, were linked to state health department records of blood lead testing by using individual identifiers. The study population (N = 3406) was 59% Hispanic. For each child, the geometric mean BLL was estimated by using all previously reported BLLs. Analyses were adjusted for gender, age, year enrolled, race, child language, and free/reduced lunch status as a measure of socioeconomic status. The median geometric mean BLL was 4.2 µg/dL; 20% of children had at least 1 venous BLL ≥10 µg/dL. Compared with children with BLLs <5 µg/dL, the adjusted prevalence ratios (95% confidence interval [CI]) for failing to achieve the national benchmark for reading readiness were 1.21 (1.19 to 1.23) and 1.56 (1.51 to 1.60) for children with BLLs of 5 to 9 and ≥10 µg/dL, respectively. On average, reading readiness scores decreased by 4.5 (95% CI: -2.9 to -6.2) and 10.0 (95% CI: -7.0 to -13.3) points for children with BLLs of 5 to 9 and ≥10 µg/dL, respectively, compared with BLLs <5 µg/dL. BLLs well below 10 µg/dL were associated with lower reading readiness at kindergarten entry. The high prevalence of elevated BLLs warrants additional investigation in other high-risk US populations. Results suggest benefits from additional collaboration between public health, public education, and community data providers.

  18. Advances in the Remote Monitoring of Balloon Flights

    NASA Astrophysics Data System (ADS)

    Breeding, S.

    At the National Scientific Balloon Facility (NSBF), we must staff the Long Duration Balloon (LDB) control center 24 hours a day during LDB flights. This requires three daily shifts of two operators (balloon control and tdrss scheduling). In addition to this we also have one engineer on-call as LDB Lead to resolve technical issues and one manager on-call for flight management. These on-call periods are typically 48 to 72 hours in length. In the past the on-call staff had to travel to the LDB control center in order to monitor the status of a flight in any detail. This becomes problematic as flight durations push out beyond 20 to 30 day lengths, as these staff members are not available for business travel during these periods. This paper describes recent advances which allow for the remote monitoring of scientific balloon flight ground station computer displays. This allows balloon flight managers and lead engineers to check flight status and performance from any location with a network or telephone connection. This capability frees key personnel from the NSBF base during flights. It also allows other interested parties to check on the flight status at their convenience.

  19. STS-114: Discovery Launch Readiness Press Conference

    NASA Technical Reports Server (NTRS)

    2005-01-01

    Michael Griffin, NASA Administrator; Wayne Hale, Space Shuttle Deputy Program Manager; Mike Wetmore, Director of Shuttle Processing; and 1st Lieutenant Mindy Chavez, Launch Weather Officer-United States Air Force 45th Weather Squadron are in attendance for this STS-114 Discovery launch readiness press conference. The discussion begins with Wayne Hale bringing to the table a low level sensor device for everyone to view. He talks in detail about all of the extensive tests that were performed on these sensors and the completion of these ambient tests. Chavez presents her weather forecast for the launch day of July 26th 2005. Michael Griffin and Wayne Hale answer questions from the news media pertaining to the sensors and launch readiness. The video ends with footage of Pilot Jim Kelly and Commander Eileen Collins conducting test flights in a Shuttle Training Aircraft (STA) that simulates Space Shuttle landing.

  20. KSC-07pd1177

    NASA Image and Video Library

    2007-05-15

    KENNEDY SPACE CENTER, FLA. -- In high bay No. 1 of the Vehicle Assembly Building, Space Shuttle Atlantis is ready for its return to Launch Pad 39A. In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder

  1. Nutritional Status Assessment (SMO 016E)

    NASA Technical Reports Server (NTRS)

    Smith, S. M.; Zwart, S. R.; Heer, M.; Ericson, K.; Coburn, S. P.; Booth, S. A.; Jones, J. A.; Lupton, J.

    2009-01-01

    Until 2006, it was not been possible to assess nutritional status of crewmembers on the ISS during flight because blood and urine could not be collected during ISS missions. Postflight observations of alterations in status of several nutrients are troubling, and we require the ability to monitor the status of these nutrients during flight to determine if there is a specific impetus or timeframe for these changes. In addition to the monitoring of crew nutritional status during flight, in-flight sample collection would allow better assessment of countermeasure effectiveness. Collecting samples during flight is one of the objectives of SMO 016E, and it is also designed to expand the current medical requirement for nutritional assessment (MR016L) to include additional normative markers for assessing crew health and countermeasure effectiveness. Additional markers of bone metabolism will be measured to better monitor bone health and the effectiveness of countermeasures to prevent bone resorption. New markers of oxidative damage will be measured to better assess the type of oxidative insults that occur during space flight. The array of nutritional assessment variables will be expanded to include ones that will allow us to better understand changes in folate, vitamin K, and vitamin B6 status, as well as risk factors for cardiovascular and oxidative damage during and after flight. Stress hormones and hormones that affect bone and muscle metabolism will also be measured. Measuring these additional variables will allow us to better monitor the health of crewmembers and make more accurate recommendations for their rehabilitation. Several nutritional assessment variables are altered at landing, but it is not known how long these changes persist. We extended the original protocol to include an additional postflight blood and urine sample collection 30 days after landing. Data are being collected before, during, and after flight. These data will provide a complete survey of how nutritional status and related systems are affected by space flight. Analyzing the data will help us to define nutritional requirements for long-duration missions. This expanded set of measurements will also aid in the identification of nutritional countermeasures to counteract, for example, the deleterious effects of microgravity on bone and muscle and the effects of space radiation.

  2. Eating ready-to-eat cereal for breakfast is positively associated with daily nutrient intake, but not weight, in Mexican-American children and adolescents: National Health and Nutrition Examination Survey 1999-2002

    USDA-ARS?s Scientific Manuscript database

    Ready-to-eat cereal (RTEC) has been associated with improved nutrient intake and weight status, but intake has not been studied in Mexican-American (MA) children. The objective of this study was to assess whether nutrient intake, mean adequacy ratio (MAR), and weight were associated with classificat...

  3. Financial Improvement and Audit Readiness (FIAR) Plan Status Report

    DTIC Science & Technology

    2011-05-01

    integrated personnel and pay system that will consolidate Guard, Reserve, and Active Duty Military into a single system for personnel and pay...Inventory The DLA is the integrated material manager for assigned federal supply classes. The DLA holds materiel based on military and...Monitoring DoD Component progress and holding them accountable is essential to success and to achieving the Department’s commitment to audit readiness by

  4. STS-26 Preflight Press Briefing: 5 Man Crew. Part 6 of 9

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This NASA KSC video release presents part of a press conference held prior to Discovery flight STS-26, the first shuttle mission flown following the 51-L Challenger accident. The video opens with a statement from Commander Frederick H. Hauck, and the introductions of crew members, Richard O. Covey, Pilot, and mission specialists, John M. Lounge, George D. Nelson, and David C. Hilmers. Some of the questions posed by scientific journalists addressed the following subjects: launch preparation in the month prior to flight, astronaut family anxieties in light of the Challenger accident, extent of safety measures made prior to flight, flight readiness firing, the crew escape system, civilians in space, conservative mission design, astronaut selection, mission turnaround and launch rate, and the ability to maintain a high level of scrutiny regarding safety on future missions.

  5. Thermal Testing and Model Correlation for Advanced Topographic Laser Altimeter Instrument (ATLAS)

    NASA Technical Reports Server (NTRS)

    Patel, Deepak

    2016-01-01

    The Advanced Topographic Laser Altimeter System (ATLAS) part of the Ice Cloud and Land Elevation Satellite 2 (ICESat-2) is an upcoming Earth Science mission focusing on the effects of climate change. The flight instrument passed all environmental testing at GSFC (Goddard Space Flight Center) and is now ready to be shipped to the spacecraft vendor for integration and testing. This topic covers the analysis leading up to the test setup for ATLAS thermal testing as well as model correlation to flight predictions. Test setup analysis section will include areas where ATLAS could not meet flight like conditions and what were the limitations. Model correlation section will walk through changes that had to be made to the thermal model in order to match test results. The correlated model will then be integrated with spacecraft model for on-orbit predictions.

  6. Hyper-X Program Status

    NASA Technical Reports Server (NTRS)

    McClinton, Charles R.; Rausch, Vincent L.; Sitz, Joel; Reukauf, Paul

    2001-01-01

    This paper provides an overview of the objectives and status of the Hyper-X program, which is tailored to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. The first Hyper-X research vehicle (HXRV), designated X-43, is being prepared at the Dryden Flight Research Center for flight at Mach 7. Extensive risk reduction activities for the first flight are completed, and non-recurring design activities for the Mach 10 X-43 (3rd flight) are nearing completion. The Mach 7 flight of the X-43, in the spring of 2001, will be the first flight of an airframe-integrated scramjet-powered vehicle. The Hyper-X program is continuing to plan follow-on activities to focus an orderly continuation of hypersonic technology development through flight research.

  7. Hyper-X Program Status

    NASA Technical Reports Server (NTRS)

    McClinton, Charles R.; Reubush, David E.; Sitz, Joel; Reukauf, Paul

    2001-01-01

    This paper provides an overview of the objectives and status of the Hyper-X program, which is tailored to move hypersonic, airbreathing vehicle technology from the laboratory environment to the flight environment. The first Hyper-X research vehicle (HXRV), designated X-43, is being prepared at the Dryden Flight Research Center for flight at Mach 7. Extensive risk reduction activities for the first flight are completed, and non-recurring design activities for the Mach 10 X-43 (third flight) are nearing completion. The Mach 7 flight of the X-43, in the spring of 2001, will be the first flight of an airframe-integrated scramjet-powered vehicle. The Hyper-X program is continuing to plan follow-on activities to focus an orderly continuation of hypersonic technology development through flight research.

  8. Auxiliary propulsion system flight package

    NASA Technical Reports Server (NTRS)

    Collett, C. R.

    1987-01-01

    Hughes Aircraft Company developed qualified and integrated flight, a flight test Ion Auxiliary Propulsion System (IAPS), on an Air Force technology satellite. The IAPS Flight Package consists of two identical Thruster Subsystems and a Diagnostic Subsystem. Each thruster subsystem (TSS) is comprised of an 8-cm ion Thruster-Gimbal-Beam Shield Unit (TGBSU); Power Electronics Unit; Digital Controller and Interface Unit (DCIU); and Propellant Tank, Valve and Feed Unit (PTVFU) plus the requisite cables. The Diagnostic Subsystem (DSS) includes four types of sensors for measuring the effect of the ion thrusters on the spacecraft and the surrounding plasma. Flight qualifications of IAPS, prior to installation on the spacecraft, consisted of performance, vibration and thermal-vacuum testing at the unit level, and thermal-vacuum testing at the subsystem level. Mutual compatibility between IAPS and the host spacecraft was demonstrated during a series of performance and environmental tests after the IAPS Flight Package was installed on the spacecraft. After a spacecraft acoustic test, performance of the ion thrusters was reverified by removing the TGBSUs for a thorough performance test at Hughes Research Laboratories (HRL). The TGBSUs were then reinstalled on the spacecraft. The IAPS Flight Package is ready for flight testing when Shuttle flights are resumed.

  9. Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

    NASA Technical Reports Server (NTRS)

    Papathakis, Kurt V.; Kloesel, Kurt J.; Lin, Yohan; Clarke, Sean; Ediger, Jacob J.; Ginn, Starr

    2016-01-01

    The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

  10. NASA Musculoskeletal Space Medicine and Reconditioning Program

    NASA Technical Reports Server (NTRS)

    Kerstman, Eric; Scheuring, Richard

    2011-01-01

    The Astronaut Strength, Conditioning, and Rehabilitation (ASCR) group is comprised of certified strength and conditioning coaches and licensed and certified athletic trainers. The ASCR group works within NASA s Space Medicine Division providing direction and supervision to the astronaut corp with regards to physical readiness throughout all phases of space flight. The ASCR group is overseen by flight surgeons with specialized training in sports medicine or physical medicine and rehabilitation. The goals of the ASCR group include 1) designing and administering strength and conditioning programs that maximize the potential for physical performance while minimizing the rate of injury, 2) providing appropriate injury management and rehabilitation services, 3) collaborating with medical, research, engineering, and mission operations groups to develop and implement safe and effective in-flight exercise countermeasures, and 4) providing a structured, individualized post-flight reconditioning program for long duration crew members. This Panel will present the current approach to the management of musculoskeletal injuries commonly seen within the astronaut corp and will present an overview of the pre-flight physical training, in-flight exercise countermeasures, and post-flight reconditioning program for ISS astronauts.

  11. Free-Flight Terrestrial Rocket Lander Demonstration for NASA's Autonomous Landing and Hazard Avoidance Technology (ALHAT) System

    NASA Technical Reports Server (NTRS)

    Rutishauser, David K.; Epp, Chirold; Robertson, Ed

    2012-01-01

    The Autonomous Landing Hazard Avoidance Technology (ALHAT) Project is chartered to develop and mature to a Technology Readiness Level (TRL) of six an autonomous system combining guidance, navigation and control with terrain sensing and recognition functions for crewed, cargo, and robotic planetary landing vehicles. The ALHAT System must be capable of identifying and avoiding surface hazards to enable a safe and accurate landing to within tens of meters of designated and certified landing sites anywhere on a planetary surface under any lighting conditions. Since its inception in 2006, the ALHAT Project has executed four field test campaigns to characterize and mature sensors and algorithms that support real-time hazard detection and global/local precision navigation for planetary landings. The driving objective for Government Fiscal Year 2012 (GFY2012) is to successfully demonstrate autonomous, real-time, closed loop operation of the ALHAT system in a realistic free flight scenario on Earth using the Morpheus lander developed at the Johnson Space Center (JSC). This goal represents an aggressive target consistent with a lean engineering culture of rapid prototyping and development. This culture is characterized by prioritizing early implementation to gain practical lessons learned and then building on this knowledge with subsequent prototyping design cycles of increasing complexity culminating in the implementation of the baseline design. This paper provides an overview of the ALHAT/Morpheus flight demonstration activities in GFY2012, including accomplishments, current status, results, and lessons learned. The ALHAT/Morpheus effort is also described in the context of a technology path in support of future crewed and robotic planetary exploration missions based upon the core sensing functions of the ALHAT system: Terrain Relative Navigation (TRN), Hazard Detection and Avoidance (HDA), and Hazard Relative Navigation (HRN).

  12. Space Shuttle Endeavour flares for landing at Edwards Air Force Base, California to conclude STS-100

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the conclusion of Space Shuttle Mission STS-100, Endeavour landed at Edwards Air Force Base, California, May 1, 2001. There the Orbiter would be readied by technicians at NASA's Dryden Flight Research Center for return to Kennedy Space Center, Florida, atop a 747 carrier aircraft.

  13. Space Shuttle Endeavour flares for landing at Edwards Air Force Base, California to conclude STS-100

    NASA Image and Video Library

    2001-05-01

    At the conclusion of Space Shuttle Mission STS-100, Endeavour landed at Edwards Air Force Base, California, May 1, 2001. There the Orbiter would be readied by technicians at NASA's Dryden Flight Research Center for return to Kennedy Space Center, Florida, atop a 747 carrier aircraft.

  14. Saturn Apollo Program

    NASA Image and Video Library

    1961-01-18

    The completely assembled Saturn 1 S-1 stage is being ready for checkout in the Marshall Space Flight Center, building 4705, January 18, 1961. The Saturn I S-I stage had eight H-1 engines clustered, using liquid oxygen/kerosene-1 (LOX/RP-1) propellants capable of producing a total of 1,500,000 pounds of thrust.

  15. The Simbol-X Low Energy Detector

    NASA Astrophysics Data System (ADS)

    Lechner, Peter

    2009-05-01

    For the Low Energy Detector of Simbol-X a new type of active pixel sensor based on the integrated amplifier DEPFET has been developed. This concept combines large area, scalable pixel size, low noise, and ultra-fast readout. Flight representative prototypes have been processed with a performance matching the Simbol-X specifications and demonstrating the technology readiness.

  16. The Future of Drone Strikes: A Framework for Analyzing Policy Options

    DTIC Science & Technology

    2014-09-01

    Christmas Day” bomber, Umar Farouk Abdulmutallab, attempted to detonate a bomb hidden in his underwear during a flight to the U.S. in 2009. The...2013/08/the-case-against-drone-strikes-on-people- who-only-act-like-terrorists/278744/. 87 [30] Jack Goldsmith, “ Fire When Ready,” Foreign Policy

  17. The Effects of Safety Information on Aeronautical Decision Making

    NASA Technical Reports Server (NTRS)

    Lee, Jang R.; Fanjoy, Richard O.; Dillman, Brian G.

    2005-01-01

    The importance of aeronautical decision making (ADM) has been considered one of the most critical issues of flight education for future professional pilots. Researchers have suggested that a safety information system based on information from incidents and near misses is an important tool to improve the intelligence and readiness of pilots. This paper describes a study that examines the effect of safety information on aeronautical decision making for students in a collegiate flight program. Data was collected from study participants who were exposed to periodic information about local aircraft malfunctions. Participants were then evaluated using a flight simulator profile and a pen and pencil test of situational judgment. Findings suggest that regular access to the described safety information program significantly improves decision making of student pilots.

  18. In-Flight Suppression of a De-Stabilized F/A-18 Structural Mode Using the Space Launch System Adaptive Augmenting Control System

    NASA Technical Reports Server (NTRS)

    Wall, John; VanZwieten, Tannen; Giiligan Eric; Miller, Chris; Hanson, Curtis; Orr, Jeb

    2015-01-01

    Adaptive Augmenting Control (AAC) has been developed for NASA's Space Launch System (SLS) family of launch vehicles and implemented as a baseline part of its flight control system (FCS). To raise the technical readiness level of the SLS AAC algorithm, the Launch Vehicle Adaptive Control (LVAC) flight test program was conducted in which the SLS FCS prototype software was employed to control the pitch axis of Dryden's specially outfitted F/A-18, the Full Scale Advanced Systems Test Bed (FAST). This presentation focuses on a set of special test cases which demonstrate the successful mitigation of the unstable coupling of an F/A-18 airframe structural mode with the SLS FCS.

  19. Pose Measurement Performance of the Argon Relative Navigation Sensor Suite in Simulated Flight Conditions

    NASA Technical Reports Server (NTRS)

    Galante, Joseph M.; Eepoel, John Van; Strube, Matt; Gill, Nat; Gonzalez, Marcelo; Hyslop, Andrew; Patrick, Bryan

    2012-01-01

    Argon is a flight-ready sensor suite with two visual cameras, a flash LIDAR, an on- board flight computer, and associated electronics. Argon was designed to provide sensing capabilities for relative navigation during proximity, rendezvous, and docking operations between spacecraft. A rigorous ground test campaign assessed the performance capability of the Argon navigation suite to measure the relative pose of high-fidelity satellite mock-ups during a variety of simulated rendezvous and proximity maneuvers facilitated by robot manipulators in a variety of lighting conditions representative of the orbital environment. A brief description of the Argon suite and test setup are given as well as an analysis of the performance of the system in simulated proximity and rendezvous operations.

  20. Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric; Dankanich, John; Glaab, Louis; Peterson, Todd

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  1. Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric J.; Dankanich, John W.; Glaab, Louis J.; Peterson, Todd T.

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance 2) NASAs Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV) 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  2. Validation of Functional Reaching Volume as an Outcome Measure across the Spectrum of Abilities in Muscular Dystrophy

    DTIC Science & Technology

    2017-09-01

    interactive video game regardless of ambulatory status. The objective of this project is to produce a trial ready outcome measure that will enable clinical...custom-designed video game using the Microsoft Kinect camera, measures functional reaching volume (FRV) across the spectrum of the disease in DMD...Kinect, video game , clinical trial readiness, neuromuscular disease, Soliton, functional reaching volume 3. ACCOMPLISHMENTS: The PI is reminded

  3. Reflections on the Ready to Learn Initiative 2010 to 2015: How a Federal Program in Partnership with Public Media Supported Young Children's Equitable Learning during a Time of Great Change

    ERIC Educational Resources Information Center

    Pasnik, Shelley; Llorente, Carlin; Hupert, Naomi; Moorthy, Savitha

    2016-01-01

    "Reflections on the Ready to Learn Initiative, 2010 to 2015," draws upon interviews with 26 prominent children's media researchers, producers, and thought leaders and a review of scholarly articles and reports to provide a big picture view of the status and future directions of children's media. In this illuminating report, EDC and SRI…

  4. Determination of technical readiness for an atmospheric carbon imaging spectrometer

    NASA Astrophysics Data System (ADS)

    Mobilia, Joseph; Kumer, John B.; Palmer, Alice; Sawyer, Kevin; Mao, Yalan; Katz, Noah; Mix, Jack; Nast, Ted; Clark, Charles S.; Vanbezooijen, Roel; Magoncelli, Antonio; Baraze, Ronald A.; Chenette, David L.

    2013-09-01

    The geoCARB sensor uses a 4-channel push broom slit-scan infrared imaging grating spectrometer to measure the absorption spectra of sunlight reflected from the ground in narrow wavelength regions. The instrument is designed for flight at geostationary orbit to provide mapping of greenhouse gases over continental scales, several times per day, with a spatial resolution of a few kilometers. The sensor provides multiple daily maps of column-averaged mixing ratios of CO2, CH4, and CO over the regions of interest, which enables flux determination at unprecedented time, space, and accuracy scales. The geoCARB sensor development is based on our experience in successful implementation of advanced space deployed optical instruments for remote sensing. A few recent examples include the Atmospheric Imaging Assembly (AIA) and Helioseismic and Magnetic Imager (HMI) on the geostationary Solar Dynamics Observatory (SDO), the Space Based Infrared System (SBIRS GEO-1) and the Interface Region Imaging Spectrograph (IRIS), along with sensors under development, the Near Infared camera (NIRCam) for James Webb (JWST), and the Global Lightning Mapper (GLM) and Solar UltraViolet Imager (SUVI) for the GOES-R series. The Tropospheric Infrared Mapping Spectrometer (TIMS), developed in part through the NASA Instrument Incubator Program (IIP), provides an important part of the strong technological foundation for geoCARB. The paper discusses subsystem heritage and technology readiness levels for these subsystems. The system level flight technology readiness and methods used to determine this level are presented along with plans to enhance the level.

  5. STS-121: Discovery Post Flight Readiness Review Briefing

    NASA Technical Reports Server (NTRS)

    2006-01-01

    This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

  6. Nutritional Status Assessment (SMO 016E)

    NASA Technical Reports Server (NTRS)

    Smith, S. M.; Zwart, S. R.; Heer, M.; Coburn, S. P.; Booth, S. A.; Jones, J. A.; Lupton, J.

    2007-01-01

    It has not been possible to assess nutritional status of crew members on the ISS during flight because blood and urine could not be collected during ISS missions. Postflight observations of alterations in nutritional status for several nutrients are troubling, and we require the ability to monitor the status of these nutrients during flight to determine if there is a specific impetus or timeframe for these changes. In addition to the monitoring of crew nutritional status during flight, in-flight sample collection would allow better assessment of countermeasure effectiveness. SMO 016E is also designed to expand the current medical requirement for nutritional assessment (MR016L) to include additional normative markers for assessing crew health and countermeasure effectiveness. Additional markers of bone metabolism will be measured to better monitor bone health and the effectiveness of countermeasures to prevent bone resorption. New markers of oxidative damage will be measured to better assess the type of oxidative insults that occur during space flight. The array of nutritional assessment parameters will be expanded to include parameters that will allow us to better understand changes in folate and vitamin B6 status, and related cardiovascular risk factors during and after flight. Additionally, stress hormones and hormones that affect bone and muscle metabolism will also be measured. This additional assessment will allow us to better monitor the health of crew members and make more accurate recommendations for their rehabilitation. Several nutritional assessment parameters are altered at landing, but it is not known how long these changes persist. We extended the current protocol to include an additional postflight blood and urine sample collection 30 days after landing. Data are being collected before, during, and after flight. These data will provide a complete survey of how nutritional status and related systems are affected by space flight. Analyzing the data will help us to define nutritional requirements for long-duration missions. This expanded set of measurements will also aid in the identification of nutritional countermeasures to counteract, for example, the deleterious effects of microgravity on bone and muscle and the effects of space radiation.

  7. 78 FR 22024 - Twenty First Meeting: RTCA Special Committee 216, Aeronautical Systems Security (Joint Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... plenary Joint Plenary [cir] Subgroup status reports [cir] Review schedule and decide on readiness of documents for Final Review and Comment [cir] Identify next steps 3:00 p.m. (1500) Wrap-Up, Adjourn...: Monday, May 13, 2013 Introductions High-level document status Review level of maturity of contributions...

  8. Expedition 11 Preflight

    NASA Image and Video Library

    2005-04-13

    The Soyuz TMA-6 sits on the pad ready for launch, Thursday, April 14, 2005, at the Baikonur Cosmodrome in Kazakhstan. Expedition 11 crew Commander Sergei Krikalev along with Flight Engineer and NASA Science Officer John Phillips and European Space Agency Astronaut Roberto Vittori, of Italy, will launch April 15, 2005. Krikalev and Phillips will spend six months on the station, replacing Expedition 10 Commander Leroy Chiao and Flight Engineer Salizhan Sharipov, while Vittori will spend eight days on the Station under a commerical contract between ESA and the Russian Federal Space Agency, returning to Earth with Chiao and Sharipov on April 25. Photo Credit: (NASA/Bill Ingalls)

  9. KSC-04PD-2681

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. The newly shod Crawler Transporter is ready for its road test. The Crawler Transporter that will move Space Shuttle Discovery to the launch pad for Return to Flight is taking its first road test following the replacement of all its shoes. The crawlers have 456 shoes, 57 per belt (8 belts in all). Each shoe weighs 2,200 pounds. Cracks appeared in the shoes in recent years, spurring a need for replacement. The new manufacturer, in Duluth, Minn., has improved the design for a safe Return to Flight and use through the balance of the Space Shuttle Program.

  10. KSC-04PD-2678

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. The newly shod Crawler Transporter is ready for a road test. The Crawler Transporter that will move Space Shuttle Discovery to the launch pad for Return to Flight is taking its first road test following the replacement of all its shoes. The crawlers have 456 shoes, 57 per belt (8 belts in all). Each shoe weighs 2,200 pounds. Cracks appeared in the shoes in recent years, spurring a need for replacement. The new manufacturer, in Duluth, Minn., has improved the design for a safe Return to Flight and use through the balance of the Space Shuttle Program.

  11. NASA's Space Launch System: Progress Toward the Proving Ground

    NASA Technical Reports Server (NTRS)

    Jackman, Angie; Johnson, Les

    2017-01-01

    With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. This paper will provide a description of the SLS vehicle, and an overview of the vehicle's capabilities and utilization potential.

  12. The STS-92 crew is ready to leave KSC after CEIT

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-92 Commander Brian Duffy climbs into a T-38 jet aircraft at KSC's Shuttle Landing Facility for a flight back to Houston. He and other crew members were at KSC for Crew Equipment Interface Test (CEIT) activities, looking over their mission payload and related equipment. STS-92 is scheduled to launch Oct. 5 on Shuttle Discovery from Launch Pad 39A on the fifth flight to the International Space Station. Discovery will carry the Integrated Truss Structure (ITS) Z1, the PMA-3, Ku-band Communications System, and Control Moment Gyros (CMGs).

  13. Lessons Learned from the Advanced Topographic Laser Altimeter System

    NASA Technical Reports Server (NTRS)

    Garrison, Matt; Patel, Deepak; Bradshaw, Heather; Robinson, Frank; Neuberger, Dave

    2016-01-01

    The ICESat-2 Advanced Topographic Laser Altimeter System (ATLAS) instrument is an upcoming Earth Science mission focusing on the effects of climate change. The flight instrument passed all environmental testing at GSFC (Goddard Space Flight Center) and is now ready to be shipped to the spacecraft vendor for integration and testing. This presentation walks through the lessons learned from design, hardware, analysis and testing perspective. ATLAS lessons learned include general thermal design, analysis, hardware, and testing issues as well as lessons specific to laser systems, two-phase thermal control, and optical assemblies with precision alignment requirements.

  14. KSC-07pd0955

    NASA Image and Video Library

    2007-04-26

    KENNEDY SPACE CENTER, FLA. -- At the Kennedy Space Center Shuttle Landing Facility, noted physicist Stephen Hawking, in the wheelchair, is ready to get onboard a modified Boeing 727 aircraft owned by Zero Gravity Corp. for his first zero-gravity flight. Zero Gravity Corp. is a commercial company licensed to provide the public with weightless flight experiences. At right is Peter Diamandis, founder of the Zero Gravity Corp. Behind Hawking is Nicola O'Brien, a nurse practitioner who is Hawking's aide. Hawking developed amyotrophic lateral sclerosis disease in the 1960s, a type of motor neuron disease which would cost him the loss of almost all neuromuscular control. At the celebration of his 65th birthday on January 8 this year, Hawking announced his plans for a zero-gravity flight to prepare for a sub-orbital space flight in 2009 on Virgin Galactic's space service. Photo credit: NASA/Kim Shiflett

  15. Nutritional Status Assessment (SMO 016E)

    NASA Technical Reports Server (NTRS)

    Smith, S. M.; Heer, M. A.; Zwart, S. R.

    2014-01-01

    The Nutritional Status Assessment Supplemental Medical Objective was initiated to expand nominal clinical nutrition testing of ISS astronauts, and to gain a better understanding of the time course of changes in nutritional status during flight. The primary activity of this effort was collecting blood and urine samples during flight for analysis after return to Earth. Samples were subjected to a battery of tests. The resulting data provide a comprehensive survey of how nutritional status and related systems are affected by 4-6 months of space flight. Analysis of these data has yielded many findings to date, including: Vision. Documented evidence that biochemical markers involved in one-carbon metabolism were altered in crewmembers who experienced vision-related issues during and after flight (1). Iron, Oxidative Stress, and Bone. In-flight data document a clear association of increased iron stores, markers of oxidative damage to DNA, and bone loss (2). Exercise. Documented that well-nourished crewmembers performing heavy resistance exercise returned from ISS with bone mineral densities unchanged from preflight (3). Furthermore, the response of bone to space flight and exercise countermeasures was the same in men and women (4). Body Mass. Crewmembers lose 2-5% of their body mass in the first month of flight, and maintain the lower body mass during flight (5). Additionally, the two devices to measure body mass on orbit, the SLAMMD and BMMD, provide similar results (5). Cytokines. Findings indicated that a pattern of persistent physiological adaptations occurs during space flight that includes shifts in immune and hormonal regulation (6). Fish/Bone. Documented a relationship between fish intake and bone loss in astronauts (that is, those who ate more fish lost less bone) (7). Vitamin K. Documented that in generally well-fed and otherwise healthy individuals, vitamin K status and bone vitamin K-dependent proteins are unaffected by space flight (and bed rest) (8). Testosterone. Documented that blood concentrations of testosterone were unchanged during flight, but a transient decline occurred after landing (9). Calcium. Nutrition SMO data contributed to the ISS Program by helping understand how and why the Urine Processor Assembly clogged with calcium sulfate precipitate (10). Sample Processing. Ground-based analytical testing results have also been published (11).

  16. Development of a knowledge acquisition tool for an expert system flight status monitor

    NASA Technical Reports Server (NTRS)

    Disbrow, J. D.; Duke, E. L.; Regenie, V. A.

    1986-01-01

    Two of the main issues in artificial intelligence today are knowledge acquisition dion and knowledge representation. The Dryden Flight Research Facility of NASA's Ames Research Center is presently involved in the design and implementation of an expert system flight status monitor that will provide expertise and knowledge to aid the flight systems engineer in monitoring today's advanced high-performance aircraft. The flight status monitor can be divided into two sections: the expert system itself and the knowledge acquisition tool. The knowledge acquisition tool, the means it uses to extract knowledge from the domain expert, and how that knowledge is represented for computer use is discussed. An actual aircraft system has been codified by this tool with great success. Future real-time use of the expert system has been facilitated by using the knowledge acquisition tool to easily generate a logically consistent and complete knowledge base.

  17. Development of a knowledge acquisition tool for an expert system flight status monitor

    NASA Technical Reports Server (NTRS)

    Disbrow, J. D.; Duke, E. L.; Regenie, V. A.

    1986-01-01

    Two of the main issues in artificial intelligence today are knowledge acquisition and knowledge representation. The Dryden Flight Research Facility of NASA's Ames Research Center is presently involved in the design and implementation of an expert system flight status monitor that will provide expertise and knowledge to aid the flight systems engineer in monitoring today's advanced high-performance aircraft. The flight status monitor can be divided into two sections: the expert system itself and the knowledge acquisition tool. This paper discusses the knowledge acquisition tool, the means it uses to extract knowledge from the domain expert, and how that knowledge is represented for computer use. An actual aircraft system has been codified by this tool with great success. Future real-time use of the expert system has been facilitated by using the knowledge acquisition tool to easily generate a logically consistent and complete knowledge base.

  18. Radioisotope Power Systems Program: A Program Overview

    NASA Technical Reports Server (NTRS)

    Hamley, John A.

    2016-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan, mature research in energy conversion, and partners with the Department of Energy (DOE) to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet potential future mission needs. Recent programs responsibilities include providing investment recommendations to NASA stakeholders on emerging thermoelectric and Stirling energy conversion technologies and insight on NASA investments at DOE in readying a generator for the Mars 2020 mission. This presentation provides an overview of the RPS Program content and status and the approach used to maintain the readiness of RPS to support potential future NASA missions.

  19. Test of a cultural framework of parenting with Latino families of young children.

    PubMed

    Calzada, Esther J; Huang, Keng-Yen; Anicama, Catherine; Fernandez, Yenny; Brotman, Laurie Miller

    2012-07-01

    This study examined the mental health and academic functioning of 442 4- and 5-year old children of Mexican (MA) and Dominican (DA) immigrant mothers using a cultural framework of Latino parenting. Data were collected on mothers' self-reported acculturative status, parenting practices and cultural socialization, and on children's behavioral functioning (mother- and teacher-report) and school readiness (child test). Results provide partial support for the validity of the framework in which mothers' acculturative status and socialization of respeto (a Latino cultural value of respect) and independence (a U.S. American cultural value) predict parenting practices. For both groups, English language competence was related to less socialization of respeto, and other domains of acculturative status (i.e., U.S. American/ethnic identity, and U.S. American/ethnic cultural competence) were related to more socialization of respeto and independence. Socialization of respeto was related to the use of authoritarian practices and socialization of independence was related to the use of authoritative practices. Socialization of respeto was also related to lower school readiness for DA children, whereas socialization of independence was related to higher school readiness for MA children. Independence was also related to higher teacher-rated externalizing problems for MA children. For both groups, authoritarian parenting was associated with more parent-reported internalizing and externalizing problems. The discussion focuses on ethnic subgroup differences and similarities to further understanding of Latino parenting from a cultural perspective.

  20. Consumption of ready-made meals and increased risk of obesity: findings from the Observation of Cardiovascular Risk Factors in Luxembourg (ORISCAV-LUX) study.

    PubMed

    Alkerwi, Ala'a; Crichton, Georgina E; Hébert, James R

    2015-01-28

    The consumption of ready-made meals, such as pre-packaged dishes, available at grocery stores and fast-food restaurants, is a habit related to our modern fast-paced lives. No study has examined the association of daily ready-made meal consumption with diet quality or health-related outcomes. The present study aimed to investigate the association between self-reported ready-made meal consumption and diet quality, as measured by compliance with dietary recommendations and with a set of adiposity measures, in a nationally representative sample of 1352 subjects, aged 18-69 years, participating in the nationwide population-based ORISCAV-LUX (Observation of Cardiovascular Risk Factors in Luxembourg) survey. The daily consumption of ready-made meals was calculated as follows: frequency of consumption × portion size × number of portions consumed. The sum of the daily consumption values of the eleven pre-packaged dishes included in the FFQ represented the total daily consumption of ready-made meals (g/d) for each participant. About 97% of the participants reported daily consumption of ready-made meals. The intake was highly prevalent in men living alone and varied according to education level. Ready-made meal consumption provided >7% of total daily energy. The fractions (%) of macro- and micronutrients derived from daily consumption of ready-made meals varied from 10% for total cholesterol to 0.65% for total fibre. Increased consumption of ready-made meals was found to be independently associated with abdominal obesity. On controlling for age, sex, socio-economic status and lifestyle factors, daily consumption of ready-made meals was found to be associated with higher energy intake and with poor compliance with national nutritional recommendations, and hence it could plausibly increase the risk of central obesity and fat deposition.

  1. Glass-Cockpit Pilot Subjective Ratings of Predictive Information, Collocation, and Mission Status Graphics: An Analysis and Summary of the Future Focus of Flight Deck Research Survey

    NASA Technical Reports Server (NTRS)

    Bartolone, Anthony; Trujillo, Anna

    2002-01-01

    NASA Langley Research Center has been researching ways to improve flight crew decision aiding for systems management. Our current investigation is how to display a wide variety of aircraft parameters in ways that will improve the flight crew's situation awareness. To accomplish this, new means are being explored that will monitor the overall health of a flight and report the current status of the aircraft and forecast impending problems to the pilots. The initial step in this research was to conduct a survey addressing how current glass-cockpit commercial pilots would value a prediction of the status of critical aircraft systems. We also addressed how this new type of data ought to be conveyed and utilized. Therefore, two other items associated with predictive information were also included in the survey. The first addressed the need for system status, alerts and procedures, and system controls to be more logically grouped together, or collocated, on the flight deck. The second idea called for the survey respondents opinions on the functionality of mission status graphics; a display methodology that groups a variety of parameters onto a single display that can instantaneously convey a complete overview of both an aircraft's system and mission health.

  2. In-Space Propulsion Program Overview and Status

    NASA Technical Reports Server (NTRS)

    Carroll, Carol; Johnson, Les; Baggett, Randy

    2002-01-01

    NASA's In-Space Propulsion (ISP) Program is designed to develop advanced propulsion technologies that can enable or greatly enhance near and mid-term NASA science missions by significantly reducing cost, mass, and/or travel times. These technologies include: Electric Propulsion (Solar and Nuclear Electric) [note: The Nuclear Electric Propulsion work will be transferred to the NSI program in FY03]; Propellantless Propulsion (aerocapture, solar sails, plasma sails, and momentum exchange tethers); Advanced Chemical Propulsion. The ISP approach to identifying and prioritizing these most promising technologies is to use mission analysis and subsequent peer review. These technologies under consideration are mid-Technology Readiness Level (TRL) up to TRL-6 for incorporation into mission planning within three - five years of initiation. In addition, maximum use of open competition is encouraged to seek optimum solutions under ISP. Several NASA Research Announcements (NRAs) have been released asking industry, academia and other organizations to propose propulsion technologies designed to improve our ability to conduct scientific study of the outer planets and beyond. The ISP Program is managed by NASA HQ (Headquarters) and implemented by the Marshall Space Flight Center in Huntsville, Alabama.

  3. NASA's Space Launch System: Deep-Space Delivery for SmallSats

    NASA Technical Reports Server (NTRS)

    Robinson, Kimberly F.; Norris, George

    2017-01-01

    Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). Planning is underway for smallsat accomodations on future configurations of the vehicle, which will present additional opportunities. This paper will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the current and future opportunities the vehicle offers for small satellites, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018 and a discussion of future capabilities.

  4. A normal incidence, high resolution X-ray telescope for solar coronal observations

    NASA Technical Reports Server (NTRS)

    Golub, L.

    1984-01-01

    A Normal Incidence high resolution X-ray Telescope is reported. The design of a telescope assembly which, after fabrication, will be integrated with the mirror fabrication process is described. The assembly is engineered to fit into the Black Brant rocket skin to survive sounding rocket launch conditions. A flight ready camera is modified and tested.

  5. KSC00pp1913

    NASA Image and Video Library

    2000-12-14

    A KSC solid rocket booster worker inspects the reusable cables and connectors located inside the external tank attachment ring on the STS-98 left-hand solid rocket booster. Inspection and X-ray analysis of the ordnance-related cable connectors is required as part of an evaluation of their flight readiness before Space Shuttle Atlantis can rollout to Launch Pad 39A

  6. KSC-00pp1913

    NASA Image and Video Library

    2000-12-14

    A KSC solid rocket booster worker inspects the reusable cables and connectors located inside the external tank attachment ring on the STS-98 left-hand solid rocket booster. Inspection and X-ray analysis of the ordnance-related cable connectors is required as part of an evaluation of their flight readiness before Space Shuttle Atlantis can rollout to Launch Pad 39A

  7. KSC01padig095

    NASA Image and Video Library

    2001-02-24

    [Photo courtesy of Boeing photographer Bob Williams.] The orbiter Columbia, atop a modified Boeing 747, rolls under protective cover at Palmdale, Calif. Columbia has been undergoing modifications and upgrades at Boeing’s Orbiter Assembly Facility in Palmdale and is ready to return to Kennedy Space Center. Ferry preparations and the flight plan are contingent upon weather conditions in California and enroute to Florida.

  8. Apollo 17 Astronauts during EVA training

    NASA Image and Video Library

    1972-06-08

    S72-44423 (8 Sept. 1972) --- Two Apollo 17 crewmen ready a Lunar Roving Vehicle trainer following its deployment from a Lunar Module trainer in the Flight Crew Training Building at the Kennedy Space Center, Florida. Taking part in the Apollo 17 training exercise were astronauts Eugene A. Cernan (right), commander; and Harrison H. "Jack" Schmitt, lunar module pilot.

  9. NASA program decisions using reliability analysis.

    NASA Technical Reports Server (NTRS)

    Steinberg, A.

    1972-01-01

    NASA made use of the analytical outputs of reliability people to make management decisions on the Apollo program. Such decisions affected the amount of the incentive fees, how much acceptance testing was necessary, how to optimize development testing, whether to approve engineering changes, and certification of flight readiness. Examples of such analysis are discussed and related to programmatic decisions.-

  10. SCRL-Model for Human Space Flight Operations Enterprise Supply Chain

    NASA Technical Reports Server (NTRS)

    Tucker, Brian; Paxton, Joseph

    2010-01-01

    This paper will present a Supply Chain Readiness Level (SCRL) model that can be used to evaluate and configure adaptable and sustainable program and mission supply chains at an enterprise level. It will also show that using SCRL in conjunction with Technology Readiness Levels (TRLs), Manufacturing Readiness Levels (MRLs) and National Aeronautics Space Administrations (NASA s) Project Lifecycle Process will provide a more complete means of developing and evaluating a robust sustainable supply chain that encompasses the entire product, system and mission lifecycle. In addition, it will be shown that by implementing the SCRL model, NASA can additionally define supplier requirements to enable effective supply chain management (SCM). Developing and evaluating overall supply chain readiness for any product, system and mission lifecycle is critical for mission success. Readiness levels are presently being used to evaluate the maturity of technology and manufacturing capability during development and deployment phases of products and systems. For example, TRLs are used to support the assessment of the maturity of a particular technology and compare maturity of different types of technologies. MRLs are designed to assess the maturity and risk of a given technology from a manufacturing perspective. In addition, when these measurement systems are used collectively they can offer a more comprehensive view of the maturity of the system. While some aspects of the supply chain and supply chain planning are considered in these familiar metric systems, certain characteristics of an effective supply chain, when evaluated in more detail, will provide an improved insight into the readiness and risk throughout the supply chain. Therefore, a system that concentrates particularly on supply chain attributes is required to better assess enterprise supply chain readiness.

  11. An Overview of NASA's SubsoniC Research Aircraft Testbed (SCRAT)

    NASA Technical Reports Server (NTRS)

    Baumann, Ethan; Hernandez, Joe; Ruhf, John

    2013-01-01

    National Aeronautics and Space Administration Dryden Flight Research Center acquired a Gulfstream III (GIII) aircraft to serve as a testbed for aeronautics flight research experiments. The aircraft is referred to as SCRAT, which stands for SubsoniC Research Aircraft Testbed. The aircraft’s mission is to perform aeronautics research; more specifically raising the Technology Readiness Level (TRL) of advanced technologies through flight demonstrations and gathering high-quality research data suitable for verifying the technologies, and validating design and analysis tools. The SCRAT has the ability to conduct a range of flight research experiments throughout a transport class aircraft’s flight envelope. Experiments ranging from flight-testing of a new aircraft system or sensor to those requiring structural and aerodynamic modifications to the aircraft can be accomplished. The aircraft has been modified to include an instrumentation system and sensors necessary to conduct flight research experiments along with a telemetry capability. An instrumentation power distribution system was installed to accommodate the instrumentation system and future experiments. An engineering simulation of the SCRAT has been developed to aid in integrating research experiments. A series of baseline aircraft characterization flights has been flown that gathered flight data to aid in developing and integrating future research experiments. This paper describes the SCRAT’s research systems and capabilities

  12. An Overview of NASA's Subsonic Research Aircraft Testbed (SCRAT)

    NASA Technical Reports Server (NTRS)

    Baumann, Ethan; Hernandez, Joe; Ruhf, John C.

    2013-01-01

    National Aeronautics and Space Administration Dryden Flight Research Center acquired a Gulfstream III (GIII) aircraft to serve as a testbed for aeronautics flight research experiments. The aircraft is referred to as SCRAT, which stands for SubsoniC Research Aircraft Testbed. The aircraft's mission is to perform aeronautics research; more specifically raising the Technology Readiness Level (TRL) of advanced technologies through flight demonstrations and gathering high-quality research data suitable for verifying the technologies, and validating design and analysis tools. The SCRAT has the ability to conduct a range of flight research experiments throughout a transport class aircraft's flight envelope. Experiments ranging from flight-testing of a new aircraft system or sensor to those requiring structural and aerodynamic modifications to the aircraft can be accomplished. The aircraft has been modified to include an instrumentation system and sensors necessary to conduct flight research experiments along with a telemetry capability. An instrumentation power distribution system was installed to accommodate the instrumentation system and future experiments. An engineering simulation of the SCRAT has been developed to aid in integrating research experiments. A series of baseline aircraft characterization flights has been flown that gathered flight data to aid in developing and integrating future research experiments. This paper describes the SCRAT's research systems and capabilities.

  13. Accomplishments of the Abrupt Wing Stall (AWS) Program and Future Research Requirements

    NASA Technical Reports Server (NTRS)

    Hall, Robert M.; Woodson, Shawn H.; Chambers, Joseph R.

    2003-01-01

    The Abrupt Wing Stall (AWS) Program has addressed the problem of uncommanded lateral motions, such as wing drop and wing rock, at transonic speeds. The genesis of this Program was the experience of the F/A-18E/F Program in the late 199O's, when wing drop was discovered in the heart of the maneuver envelope for the pre-production aircraft. While the F/A-18E/F problem was subsequently corrected by a leading-edge flap scheduling change and the addition of a porous door to the wing fold fairing, the AWS Program was initiated as a national response to the lack of technology readiness available at the time of the F/A-18E/F Development Program. The AWS Program objectives were to define causal factors for the F/A-18E/F experience, to gain insights into the flow physics associated with wing drop, and to develop methods and analytical tools so that future programs could identify this type of problem before going to flight test. The paper reviews, for the major goals of the AWS Program, the status of the technology before the program began, the program objectives, accomplishments, and impacts. Lessons learned are presented for the benefit of future programs that must assess whether a vehicle will have uncommanded lateral motions before going to flight test. Finally, recommended future research needs are presented in light of the AWS Program experience.

  14. Adaptive Augmenting Control Flight Characterization Experiment on an F/A-18

    NASA Technical Reports Server (NTRS)

    VanZwieten, Tannen S.; Gilligan, Eric T.; Wall, John H.; Orr, Jeb S.; Miller, Christopher J.; Hanson, Curtis E.

    2014-01-01

    The NASA Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an Adaptive Augmenting Control (AAC) algorithm for launch vehicles that improves robustness and performance by adapting an otherwise welltuned classical control algorithm to unexpected environments or variations in vehicle dynamics. This AAC algorithm is currently part of the baseline design for the SLS Flight Control System (FCS), but prior to this series of research flights it was the only component of the autopilot design that had not been flight tested. The Space Launch System (SLS) flight software prototype, including the adaptive component, was recently tested on a piloted aircraft at Dryden Flight Research Center (DFRC) which has the capability to achieve a high level of dynamic similarity to a launch vehicle. Scenarios for the flight test campaign were designed specifically to evaluate the AAC algorithm to ensure that it is able to achieve the expected performance improvements with no adverse impacts in nominal or nearnominal scenarios. Having completed the recent series of flight characterization experiments on DFRC's F/A-18, the AAC algorithm's capability, robustness, and reproducibility, have been successfully demonstrated. Thus, the entire SLS control architecture has been successfully flight tested in a relevant environment. This has increased NASA's confidence that the autopilot design is ready to fly on the SLS Block I vehicle and will exceed the performance of previous architectures.

  15. Marital Status, Home Environments, and Family Strain: Complex Effects on Preschool Children's School Readiness Skills

    ERIC Educational Resources Information Center

    Son, SeungHee Claire; Peterson, Mieko Fuse

    2017-01-01

    The current study examined the complex associations among marital status, home environments, and family strain (i.e. income, maternal depressive symptoms, social support, and parenting stress), as they predict preschool children's pre-academic and social skills at 36 and 54 months. Findings from the [National Institute of Child Health and Human…

  16. KSC-01pp1481

    NASA Image and Video Library

    2001-08-10

    KENNEDY SPACE CENTER, Fla. - Expedition Three crew member Vladimir Dezhurov (left) is ready for his first space flight, under the guidance of STS-105 Commander Scott Horowitz (center). Helping with flight equipment before launch is (right) USA Mechanical Technician Al Schmidt. The payload on the STS-105 mission to the International Space Station includes the third flight of the Italian-built Multi-Purpose Logistics Module Leonardo, delivering additional scientific racks, equipment and supplies for the Space Station, and the Early Ammonia Servicer (EAS) tank. The EAS, which will be attached to the Station during two spacewalks, contains spare ammonia for the Station’s cooling system. Also, the Expedition Three crew is aboard to replace the Expedition Two crew on the International Space Station, who will be returning to Earth aboard Discovery after a five-month stay on the Station

  17. KSC-2014-4219

    NASA Image and Video Library

    2014-09-25

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Mike Tillema, chief of Flight Operations in the Operations Support Division of NASA Center Operations, center, discusses plans for a training session to practice use of a Bambi Bucket in honing firefighting techniques. Bill Martin, a URS Federal Technical Services pilot in NASA Flight Operations, is on the left, with crew chief Mark Smith, also of URS. Firefighters respond to wildfires with teams on the ground and in the air. The most up-to-date tools include helicopters that use Bambi Buckets large quantities of water. NASA Flight Operations teams are training to perfect the skills needed to ensure they are ready to use tools, such as the Bambi Bucket, in the event of an out-of-control blaze at the spaceport. Photo credit: NASA/Frankie Martin

  18. Saturn V Vehicle for the Apollo 4 Mission in the Vehicle Assembly Building

    NASA Technical Reports Server (NTRS)

    1967-01-01

    This photograph depicts the Saturn V vehicle (SA-501) for the Apollo 4 mission in the Vehicle Assembly Building (VAB) at the Kennedy Space Center (KSC). After the completion of the assembly operation, the work platform was retracted and the vehicle was readied to rollout from the VAB to the launch pad. The Apollo 4 mission was the first launch of the Saturn V launch vehicle. Objectives of the unmanned Apollo 4 test flight were to obtain flight information on launch vehicle and spacecraft structural integrity and compatibility, flight loads, stage separation, and subsystems operation including testing of restart of the S-IVB stage, and to evaluate the Apollo command module heat shield. The Apollo 4 was launched on November 9, 1967 from KSC.

  19. Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

    NASA Technical Reports Server (NTRS)

    Bauer, Robert A.; Millar, Pamela S.; Norton, Charles D.

    2015-01-01

    Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

  20. Using the brain's fight-or-flight response for predicting mental illness on the human space flight program

    NASA Astrophysics Data System (ADS)

    Losik, L.

    A predictive medicine program allows disease and illness including mental illness to be predicted using tools created to identify the presence of accelerated aging (a.k.a. disease) in electrical and mechanical equipment. When illness and disease can be predicted, actions can be taken so that the illness and disease can be prevented and eliminated. A predictive medicine program uses the same tools and practices from a prognostic and health management program to process biological and engineering diagnostic data provided in analog telemetry during prelaunch readiness and space exploration missions. The biological and engineering diagnostic data necessary to predict illness and disease is collected from the pre-launch spaceflight readiness activities and during space flight for the ground crew to perform a prognostic analysis on the results from a diagnostic analysis. The diagnostic, biological data provided in telemetry is converted to prognostic (predictive) data using the predictive algorithms. Predictive algorithms demodulate telemetry behavior. They illustrate the presence of accelerated aging/disease in normal appearing systems that function normally. Mental illness can predicted using biological diagnostic measurements provided in CCSDS telemetry from a spacecraft such as the ISS or from a manned spacecraft in deep space. The measurements used to predict mental illness include biological and engineering data from an astronaut's circadian and ultranian rhythms. This data originates deep in the brain that is also damaged from the long-term exposure to cortisol and adrenaline anytime the body's fight or flight response is activated. This paper defines the brain's FOFR; the diagnostic, biological and engineering measurements needed to predict mental illness, identifies the predictive algorithms necessary to process the behavior in CCSDS analog telemetry to predict and thus prevent mental illness from occurring on human spaceflight missions.

  1. Aeronautical-Satellite-Assisted Process Being Developed for Information Exchange Through Network Technologies (Aero-SAPIENT)

    NASA Technical Reports Server (NTRS)

    Zernic, Michael J.

    2001-01-01

    Communications technologies are being developed to address safety issues during aviation travel. Some of these technologies enable the aircraft to be in constant bidirectional communications with necessary systems, people, and other aircraft that are not currently in place today. Networking technologies, wireless datalinks, and advanced avionics techniques are areas of particular importance that the NASA Glenn Research Center has contributed. Glenn, in conjunction with the NASA Ames Research Center, NASA Dryden Flight Research Center, and NASA Langley Research Center, is investigating methods and applications that would utilize these communications technologies. In mid-June 2000, the flight readiness of the network and communications technologies were demonstrated via a simulated aircraft. A van simulating an aircraft was equipped with advanced phased-array antennas (Advanced Communications/Air Traffic Management (AC/ATM) Advanced Air Transportation Technologies (AATT) project) that used commercial Ku-band satellite communications to connect Glenn, Dryden, and Ames in a combined system ground test. This test simulated air-ground bidirectional transport of real-time digital audio, text, and video data via a hybrid network configuration that demonstrated the flight readiness of the network and communications technologies. Specifically, a Controller Pilot Data Link Communications application was used with other applications to demonstrate a multiprotocol capability via Internet-protocol encapsulated ATN (Aeronautical Telecommunications Network) data packets. The significance of this combined ground test is its contribution to the Aero Information Technology Base Program Level I milestone (Software Technology investment area) of a real-time data link for the National Airspace System. The objective of this milestone was to address multiprotocol technology applicable for real-time data links between aircraft, a satellite, and the ground as well as the ability to distribute flight data with multilevel priorities among several sites.

  2. The effect of birth preparedness and complication readiness on skilled care use: a prospective follow-up study in Southwest Ethiopia

    PubMed Central

    2014-01-01

    Abstracts Background Skilled care during and immediately after delivery has been identified as one of the key strategies in reducing maternal mortality. However, recent estimates show that the status of skilled care during delivery remained very low in Ethiopia. Birth preparedness and complication readiness has been implemented as comprehensive strategy to fill this gap. However, its effectiveness in improving skilled care use hasn’t been well studied. Objective The objective of this study was to determine the effect of birth preparedness and complication readiness on skilled care use in Southwest Ethiopia. Methods A prospective follow-up study was conducted from September 2012-April 2013 in Southwest Ethiopia among randomly selected 3472 mothers. Data were collected by using pre-tested interviewer administered questionnaires and analyzed by using SPSS for windows V.20.0 and STATA 13. Mixed-effects multilevel logistic regression model was used to look at the relation between birth preparedness and complication readiness plan and skilled care use and identify other determinant factors. Results The status of skilled care use was 17.5% (95% CI: 16.2%, 18.8%). Factors affecting skilled care use existed both at the community as well as individual levels. Planning to use skilled care during pregnancy was found to increase actual use significantly (OR = 2.24; 95%CI: 1.60, 3.15). Place of residence, access to basic emergency obstetric care, maternal education, husband’s occupation, wealth quintiles, number of pregnancy, inter-birth interval, knowledge of key danger signs during labor and ANC use were identified as factors affecting skilled care use. Conclusions The status of skilled care use was found to be low in the study area. Birth preparedness and complication readiness had significant effect on skilled care use. Socio-demographic, economic, access to health facility, maternal obstetric factors and antenatal care were identified as determinant factors for skilled care use. Designing appropriate interventions to improve information, education and communication, antenatal care use, family planning and knowledge of key danger signs are recommended. PMID:25091203

  3. Measuring In-Hospital Recovery After Colorectal Surgery Within a Well-Established Enhanced Recovery Pathway: A Comparison Between Hospital Length of Stay and Time to Readiness for Discharge.

    PubMed

    Balvardi, Saba; Pecorelli, Nicolò; Castelino, Tanya; Niculiseanu, Petru; Liberman, A Sender; Charlebois, Patrick; Stein, Barry; Carli, Franco; Mayo, Nancy E; Feldman, Liane S; Fiore, Julio F

    2018-05-15

    Hospital length of stay is often used as a measure of in-hospital recovery but may be confounded by organizational factors. Time to readiness for discharge may provide a superior index of recovery. The purpose of this study was to contribute evidence for the construct validity of time to readiness for discharge and length of stay as measures of in-hospital recovery after colorectal surgery in the context of a well-established enhanced recovery pathway. This was an observational validation study designed according to the COnsensus-based Standards for the selection of health status Measurement INstruments (COSMIN) checklist. The study was conducted at a university-affiliated tertiary hospital. A total of 100 consecutive patients undergoing elective colorectal resection (mean age = 65 y; 57% men; 81% laparoscopic) who participated in a randomized controlled trial were included. We tested a priori hypotheses that length of stay and time-to-readiness for discharge are longer in patients undergoing open surgery, with lower physical status, with severe comorbidities, with postoperative complications, undergoing rectal surgery, who are older (≥75 y), who have a new stoma, and who have inflammatory bowel disease. Median time-to-readiness for discharge and length of stay were both 3 days. For both measures, 6 of 8 construct validity hypotheses were supported (hypotheses 1 and 4-8). The use of secondary data from a randomized controlled trial (risk of selection bias) was a limitation. Results may not be generalizable to institutions where patient care is not equally structured. This study contributes evidence to the construct validity of time-to-readiness for discharge and length of stay as measures of in-hospital recovery within enhanced recovery pathways. Our findings suggest that length of stay can be a less resource-intensive and equally construct-valid index of in-hospital recovery compared with time-to-readiness for discharge. Enhanced recovery pathways may decrease process-of-care variances that impact length of stay, allowing more timely discharge once discharge criteria are achieved. See Video Abstract at http://links.lww.com/DCR/A564.

  4. 5 CFR 353.102 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... performed. Partially recovered means an injured employee, though not ready to resume the full range of his... for the purpose of examination to determine fitness to perform such duty. Status means the particular...

  5. 5 CFR 353.102 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... performed. Partially recovered means an injured employee, though not ready to resume the full range of his... for the purpose of examination to determine fitness to perform such duty. Status means the particular...

  6. Laboratory and balloon flight performance of the liquid xenon gamma ray imaging telescope

    NASA Astrophysics Data System (ADS)

    Curioni, Alessandro

    2004-10-01

    This thesis presents the laboratory calibration and in- flight performance of the liquid xenon γ-ray imaging telescope (LXeGRIT). LXeGRIT is the prototype of a novel concept of Compton telescope, based on a liquid xenon time projection chamber (LXeTPC), developed through several years by Prof. Aprile and collaborators at Columbia. When I joined the collaboration in Spring 1999, LXeGRIT was getting ready for a balloon borne experiment with the goal of performing the key measurement of the background at balloon altitude. After the 1999 balloon flight, a good deal of work was devoted to a thorough calibration of LXeGRIT, both through several tests in the laboratory and through improving the analysis software and developing Monte Carlo simulations. After substantial advancements in our understanding of the detector performance, LXeGRIT was improved and calibrated before a long duration balloon campaign in the Fall of 2000. Data gathered in this flight have allowed a detailed study of the background at balloon altitude and of the sensitivity to celestial γ-ray sources, the focus of the second part of my thesis. As this dissertation is intended to show, “the LXeGRIT phase”—defined as the prototype work, the experimental demonstration of the LXeTPC concept as a Compton telescope, the measurement of the background and of the detection sensitivity—has been now successfully completed. We are now ready for future implementations of the LXeTPC technology for astrophysics observations. The detailed calibration of LXeGRIT, both as an imaging calorimeter and as a Compton telescope is described in Chapters 2, 3 and 4. In Chapter 5 more details are given of LXeGRIT as a balloon borne instrument and its flight performance in year 2000. The measurement of the background at balloon altitude, based on the data collected in year 2000, is presented in Chapter 6 and the sensitivity of the instrument is derived in Chapter 7. An overview of future developments for the LXeTPC technology in the field of γ-ray astronomy is given in Chapter 8. The main results from the 1999 balloon flight are summarized in Appendix A.

  7. Cost Estimate for Molybdenum and Tantalum Refractory Metal Alloy Flow Circuit Concepts

    NASA Technical Reports Server (NTRS)

    Hickman, Robert R.; Martin, James J.; Schmidt, George R.; Godfroy, Thomas J.; Bryhan, A.J.

    2010-01-01

    The Early Flight Fission-Test Facilities (EFF-TF) team at NASA Marshall Space Flight Center (MSFC) has been tasked by the Naval Reactors Prime Contract Team (NRPCT) to provide a cost and delivery rough order of magnitude estimate for a refractory metal-based lithium (Li) flow circuit. The design is based on the stainless steel Li flow circuit that is currently being assembled for an NRPCT task underway at the EFF-TF. While geometrically the flow circuit is not representative of a final flight prototype, knowledge has been gained to quantify (time and cost) the materials, manufacturing, fabrication, assembly, and operations to produce a testable configuration. This Technical Memorandum (TM) also identifies the following key issues that need to be addressed by the fabrication process: Alloy selection and forming, cost and availability, welding, bending, machining, assembly, and instrumentation. Several candidate materials were identified by NRPCT including molybdenum (Mo) alloy (Mo-47.5 %Re), tantalum (Ta) alloys (T-111, ASTAR-811C), and niobium (Nb) alloy (Nb-1 %Zr). This TM is focused only on the Mo and Ta alloys, since they are of higher concern to the ongoing effort. The initial estimate to complete a Mo-47%Re system ready for testing is =$9,000k over a period of 30 mo. The initial estimate to complete a T-111 or ASTAR-811C system ready for testing is =$12,000k over a period of 36 mo.

  8. Amending the Rules of the House of Representatives to require any Member whose Members' Representational Allowance is used to pay for a flight on a private aircraft to report information on the flight not later than 30 days after the flight, and requiring any Senator whose official funds are used to pay for a flight on a private aircraft to report information on the flight not later than 30 days after the flight.

    THOMAS, 113th Congress

    Rep. Cassidy, Bill [R-LA-6

    2014-09-11

    House - 09/11/2014 Referred to the Committee on Ethics, and in addition to the Committee on House Administration, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  9. Fundamentals for Team Based Rehearsals and the Differences Between Low Earth and Deep Space Missions

    NASA Technical Reports Server (NTRS)

    Gomez-Rosa, Carlos; Alfonzo, Agustin; Cifuentes, Juan; Wasiak, Francis

    2015-01-01

    Presentation to be presented at the 2015 IEEE Aerospace Conference, Big Sky, Montana, March 7-14-2015.Rehearsals are mission level readiness tests that exercise personnel, operational process, and flight products, in a near flight like environment. The program is started 6-9 months prior to launch and is used to ensure the final as built system will meet mission goals (i.e. validation). On Deep Space missions you rehearse cruise activities post launch!Focus on critical activities to the mission, (i.e. propulsive maneuvers, instrument commissioning and any first time events or coordinating activities that involve major stakeholders).

  10. KSC-2009-3669

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – In the Assembly and Refurbishment Facility at NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly (comprising the frustum, forward skirt extension and forward skirt) is ready to be moved to the Vehicle Assembly Building for stacking operations with other segments. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  11. Main propulsion system test requirements for the two-engine Shuttle-C

    NASA Technical Reports Server (NTRS)

    Lynn, E. E.; Platt, G. K.

    1989-01-01

    The Shuttle-C is an unmanned cargo carrying derivative of the space shuttle with optional two or three space shuttle main engines (SSME's), whereas the shuttle has three SSME's. Design and operational differences between the Shuttle-C and shuttle were assessed to determine requirements for additional main propulsion system (MPS) verification testing. Also, reviews were made of the shuttle main propulsion test program objectives and test results and shuttle flight experience. It was concluded that, if significant MPS modifications are not made beyond those currently planned, then main propulsion system verification can be concluded with an on-pad flight readiness firing.

  12. KSC-2009-2016

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Steve Swanson has the final fitting of his launch and entry suit. Swanson is making his second shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  13. An overview of the V&V of Flight-Critical Systems effort at NASA

    NASA Technical Reports Server (NTRS)

    Brat, Guillaume P.

    2011-01-01

    As the US is getting ready for the Next Generation (NextGen) of Air Traffic System, there is a growing concern that the current techniques for verification and validation will not be adequate for the changes to come. The JPDO (in charge of implementing NextGen) has given NASA a mandate to address the problem and it resulted in the formulation of the V&V of Flight-Critical Systems effort. This research effort is divided into four themes: argument-based safety assurance, distributed systems, authority and autonomy, and, software intensive systems. This paper presents an overview of the technologies that will address the problem.

  14. Evaluation of prototype Advanced Life Support (ALS) pack for use by the Health Maintenance Facility (HMF) on Space Station Freedom (SSF)

    NASA Technical Reports Server (NTRS)

    Krupa, Debra T.; Gosbee, John; Murphy, Linda; Kizzee, Victor D.

    1991-01-01

    The purpose is to evaluate the prototype Advanced Life Support (ALS) Pack which was developed for the Health Maintenance Facility (HMF). This pack will enable the Crew Medical Officer (CMO) to have ready access to advanced life support supplies and equipment for time critical responses to any situation within the Space Station Freedom. The objectives are: (1) to evaluate the design of the pack; and (2) to collect comments for revision to the design of the pack. The in-flight test procedures and other aspects of the KC-135 parabolic test flight to simulate weightlessness are presented.

  15. M2-F3 on lakebed

    NASA Image and Video Library

    1970-06-19

    The M2-F3 Lifting Body is seen here on the lakebed at the NASA Flight Research Center (FRC--later the Dryden Flight Research Center), Edwards, California. After a three-year-long redesign and rebuilding effort, the M2-F3 was ready to fly. The May 1967 crash of the M2-F2 had damaged both the external skin and the internal structure of the lifting body. At first, it seemed that the vehicle had been irreparably damaged, but the original manufacturer, Northrop, did the repair work and returned the redesigned M2-F3 with a center fin for stability to the FRC.

  16. Mars Observer/Transfer Orbit Stage (TOS)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    In the Payload Hazardous Servicing Facility, the integrated Mars Observer/Transfer Orbit Stage (TOS) payload is ready for encapsulation in the Titan III nose fairing. The TOS booster maiden flight was dedicated to Thomas O. Paine, a former NASA administrator who strongly supported interplanetary exploration and was an early backer of the TOS program. Launched September 25, 1992 from the Kennedy Space Flight Center aboard a Titan III rocket and the TOS, the Mars Observer spacecraft was to be the first U.S. spacecraft to study Mars since the Viking missions 18 years prior. Unfortunately, the Mars Observer spacecraft fell silent just 3 days prior to entering orbit around Mars.

  17. Space Science

    NASA Image and Video Library

    1992-08-13

    In the Payload Hazardous Servicing Facility, the integrated Mars Observer/Transfer Orbit Stage (TOS) payload is ready for encapsulation in the Titan III nose fairing. The TOS booster maiden flight was dedicated to Thomas O. Paine, a former NASA administrator who strongly supported interplanetary exploration and was an early backer of the TOS program. Launched September 25, 1992 from the Kennedy Space Flight Center aboard a Titan III rocket and the TOS, the Mars Observer spacecraft was to be the first U.S. spacecraft to study Mars since the Viking missions 18 years prior. Unfortunately, the Mars Observer spacecraft fell silent just 3 days prior to entering orbit around Mars.

  18. UTM Technical Capabilities Level 2 (TLC2) Test at Reno-Stead Airport.

    NASA Image and Video Library

    2016-10-06

    Test of Unmanned Aircraft Systems Traffic Management (UTM) technical capability Level 2 (TCL2) at Reno-Stead Airport, Nevada. During the test, five drones simultaneously crossed paths, separated by altitude. Two drones flew beyond visual line-of-sight and three flew within line-of-sight of their operators. Precision Hawk pilot readies Lancaster Mark 3 UAS for test flight.

  19. An Evaluation of the Effectiveness of a Self-Tutoring Approach Applied to Pilot Training.

    ERIC Educational Resources Information Center

    Hatch, Richard S.

    One of the critical aspects of the pilot's job is the requirement for accurate and ready recall of a large body of flight information. The effectiveness of a voluntary self-tutoring device to facilitate information acquisition and retention was examined. The device was a card machine which presented and scored responses to multiple choice…

  20. Lab-On-a-Chip Application Development (LOCAD): Bridging Technology Readiness for Exploration

    NASA Technical Reports Server (NTRS)

    Spearing, Scott F.; Jenkins, Andy

    2004-01-01

    At Marshall Space Flight Center we have established a capability to investigate the use of microfluidics for space flight. The Lab-On-a-Chip Application Development (LOCAD) team has created a program for advancing Technology Readiness Levels (TRL) of 1 and 2 to TRL 6 and 7, quickly and economically for Lab-On-a-Chip (LOC) applications. Scientists and engineers can utilize LOCAD'S process to efficiently learn about microfluidics and determine if microfluidics is applicable to their needs. Once the applicability has been determined, LOCAD can then perform tests to develop the new fluidic protocols which are different from macro-scale chemical reaction protocols. With this information new micro-fluidic devices can be created and tested. Currently, LOCAD is focused on using microfluidics for both Environmental Monitoring & Control, and Medical Systems. Eventually, handheld portable units utilizing LOC technology will perform rapid tests to determine water quality, and microbial contamination levels. Since LOC technology is drastically reduced in physical size, it thereby reduces power, weight, volume, and sample requirements, a big advantage considering the resource constraints associated with spaceflight. Another one of LOCAD's current activities is the development of a microfluidic system to aid in the search for life on Mars.

  1. To provide for the redesignation of the Asia-Pacific Center for Security Studies as the Daniel K. Inouye Asia-Pacific Center for Security Studies.

    THOMAS, 113th Congress

    Rep. Hanabusa, Colleen W. [D-HI-1

    2013-12-23

    House - 01/24/2014 Referred to the Subcommittee on Readiness. (All Actions) Notes: For further action, see H.R.3979, which became Public Law 113-291 on 12/19/2014. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  2. Validation of Afterbody Aeroheating Predictions for Planetary Probes: Status and Future Work

    NASA Technical Reports Server (NTRS)

    Wright, Michael J.; Brown, James L.; Sinha, Krishnendu; Candler, Graham V.; Milos, Frank S.; Prabhu, DInesh K.

    2005-01-01

    A review of the relevant flight conditions and physical models for planetary probe afterbody aeroheating calculations is given. Readily available sources of afterbody flight data and published attempts to computationally simulate those flights are summarized. A current status of the application of turbulence models to afterbody flows is presented. Finally, recommendations for additional analysis and testing that would reduce our uncertainties in our ability to accurately predict base heating levels are given.

  3. X-1E launch from B-50 mothership

    NASA Technical Reports Server (NTRS)

    1950-01-01

    Beginning in 1946, two XS-1 experimental research aircraft (later redesignated X-1s) conducted pioneering tests at Muroc Army Air Field (now Edwards Air Force Base) in California to obtain flight data on conditions in the transonic speed range. These early tests culminated on October 14, 1947, in the first piloted flight faster than Mach 1.0, the speed of sound. During November, 1947, the Air Force authorized studies that led to a contract (W-33-038-ac-20062) with Bell Aircraft to build four (later three) improved X-1 aircraft (the X-1C being cancelled). Designated X-1A (#48-1384), X-1B (#48-1385), and X-1D (#48-1386), the airplanes were ready by late 1950. The aircraft were about five feet longer and 2,500 lbs. heavier than the original X-craft planes. They used the 8-percent wing like the earlier X-craft. The D-model had a low-pressure turbo-pump and the B model was fitted with a prototype hydrogen peroxide reaction control system for later aircraft to use in exoatmospheric research flights. Access was through a lift-off canopy. The planes were finished in their bare metal color and white. The X-1D was ready first, but on what was intended to be its second flight (August 22, 1951) it was jettisoned and crashed at Muroc after an aerial explosion while still mated to its mother (B-50A [#46-006A]) ship. The long-delayed X-1 #3 airplane with the turbine pump was finally completed for the NACA in 1951. It made its first glide flight on July 20, 1951, with NACA pilot Joseph Cannon. Its second and final captive flight was on November 9, 1951. It was destroyed on the ground by an explosion and fire along with its B-50A mother ship while attempting to jettison fuel. The X-1A arrived at Muroc in January, 1953 and had its first powered flight on February 21, 1953. On December 8, 1953 with Yeager as pilot, the aircraft investigated high-speed stability and control issues. The X-1A was turned over to the NACA, but was lost to aerial explosion on August 8, 1955, shortly before it was to be launched on its second flight. It had to be jettisoned to the Muroc desert. Shop experiments soon determined that the deadly explosive culprit for the X-1D, the X-1 #3, and the X-1A was the ulmer leather gasket material used in contact with the liquid oxygen. The loss of the X-1 #3 and the X-1D led the NACA to rebuild the X-1 #2 into a new aircraft. By December 1955, the redesignated X-1E was ready. It featured a new, very thin 4-percent wing along with the existing 8-percent tail, with an efficient low-pressure turbo-pump for the engine. It also contained an ejection seat for the pilot, unlike the original X-1. On October 8, 1957, the aircraft with NACA pilot Joseph A. Walker achieved a speed of Mach 2.24 (1,478 mph). During its second flight career, the new X-1E allowed NACA to gather significant data on high Mach flight and stability questions and to demonstrate improved engine and production technology for incorporation into new USAF aircraft. The X-1E was also used to obtain in-flight data on the improvements achieved with the high-speed wing. These wings, made by Stanley Aircraft, wereonly 3 - 3/8-in. thick at the thickest point and had 343 gauges installed in them for measurement of structural loads and aerodynamic heating. Like the original X-1 it was air launched. This movie clip running about 10 seconds shows a drop from the B-50 mothership, accelerating away under rocket power and at speed making a high altitude contrail.

  4. Assessing the Readiness of Nursing Sectors in Low- and Middle-Income Countries to Adopt Holistic Practice: Rwanda as Exemplar.

    PubMed

    Rosa, William

    Over the past several years, holistic nursing education has become more readily available to nurses working in high-income nations, and holistic practice has become better defined and promoted through countless organizational and governmental initiatives. However, global nursing community members, particularly those serving in low- and middle-income countries (LMICs) within resource-constrained health care systems, may not find holistic nursing easily accessible or applicable to practice. The purpose of this article is to assess the readiness of nursing sectors within these resource-constrained settings to access, understand, and apply holistic nursing principles and practices within the context of cultural norms, diverse definitions of the nursing role, and the current status of health care in these countries. The history, current status, and projected national goals of professional nursing in Rwanda is used as an exemplar to forward the discussion regarding the readiness of nurses to adopt holistic education into practice in LMICs. A background of holistic nursing practice in the United States is provided to illustrate the multifaceted aspects of support necessary in order that such a specialty continues to evolve and thrive within health care arenas and the communities it cares for.

  5. Associations Among Family Environment, Sustained Attention, and School Readiness for Low-Income Children

    PubMed Central

    Razza, Rachel A.; Martin, Anne; Brooks-Gunn, Jeanne

    2011-01-01

    In this study, we examined the developmental pathways from children’s family environment to school readiness within a low-income sample (N = 1,046), with a specific focus on the role of sustained attention. Six distinct factors of the family environment representing maternal parenting behaviors, the physical home environment, and maternal mental health at 3 years of age were explored as independent predictors of children’s observed sustained attention as well as cognitive and behavioral outcomes at 5 years of age. Children were grouped by poverty status (poor vs. near-poor). Results suggest specificity in the associations among attention (focused attention and lack of impulsivity) and its correlates, with different patterns emerging by poverty status group. Overall, the family environment was largely unrelated to children’s sustained attention. For both groups, focused attention was associated with receptive vocabulary; however, it partially mediated the association between maternal lack of hostility and receptive vocabulary only among the near-poor. In addition, lack of impulsivity was associated with both receptive vocabulary and externalizing behaviors but only for the poor group. Findings indicate sustained attention as a potential target for efforts aimed at enhancing school readiness among predominantly poor children. PMID:20677860

  6. Motives for smoking cessation are associated with stage of readiness to quit smoking and sociodemographics among German industrial employees.

    PubMed

    Reime, Birgit; Ratner, Pamela A; Seidenstücker, Sabine; Janssen, Patricia A; Novak, Peter

    2006-01-01

    To test the relationships among particular motives for smoking cessation, stage of readiness to quit (preparation or contemplation), and sociodemographic characteristics. A cross-sectional study to examine attitudes toward and use of health promotion at the worksite, using a self-administered questionnaire. Two German metal companies. Of 1641 responding employees (response rate 65% in company A and 44% in company B), 360 smokers who intended to quit immediately (n = 105) or in the near future (n = 255) were analyzed. The questionnaire comprised of sociodemographic characteristics, smoking behavior, smoking history, readiness to quit smoking, motives to quit, such as coworkers' complaints and health-related or financial concerns. Chi-squared tests and multiple logistic regression analyses were performed. Health-related reasons (94%) predominated financial (27%) or image-related (14%) reasons for smoking cessation. Participants in the cessation preparation group were more likely to report an awareness of being addicted (79.6% vs. 58.2%; p < .001) and the negative public image (22.5% vs. 11.6%; p < .01) as reasons for quitting compared with those in the contemplation group. In multivariable regression models, the motives for smoking cessation, including reduced performance, family's and coworkers' complaints, pregnancy/children, and negative public image, but not health-related and financial concerns, differed significantly by gender, age, marital status, education, and occupational status. Motives for smoking cessation vary according to the individual's level of readiness to quit and sociodemographic background.

  7. Test of a Cultural Framework of Parenting With Latino Families of Young Children

    PubMed Central

    Calzada, Esther J.; Huang, Keng-Yen; Anicama, Catherine; Fernandez, Yenny; Brotman, Laurie Miller

    2015-01-01

    This study examined the mental health and academic functioning of 442 4- and 5-year old children of Mexican (MA) and Dominican (DA) immigrant mothers using a cultural framework of Latino parenting. Data were collected on mothers' self-reported acculturative status, parenting practices and cultural socialization, and on children's behavioral functioning (mother- and teacher-report) and school readiness (child test). Results provide partial support for the validity of the framework in which mothers' acculturative status and socialization of respeto (a Latino cultural value of respect) and independence (a U.S. American cultural value) predict parenting practices. For both groups, English language competence was related to less socialization of respeto, and other domains of acculturative status (i.e., U.S. American/ethnic identity, and U.S. American/ethnic cultural competence) were related to more socialization of respeto and independence. Socialization of respeto was related to the use of authoritarian practices and socialization of independence was related to the use of authoritative practices. Socialization of respeto was also related to lower school readiness for DA children, whereas socialization of independence was related to higher school readiness for MA children. Independence was also related to higher teacher-rated externalizing problems for MA children. For both groups, authoritarian parenting was associated with more parent-reported internalizing and externalizing problems. The discussion focuses on ethnic subgroup differences and similarities to further understanding of Latino parenting from a cultural perspective. PMID:22686147

  8. USM3D Unstructured Grid Solutions for CAWAPI at NASA LaRC

    NASA Technical Reports Server (NTRS)

    Lamar, John E.; Abdol-Hamid, Khaled S.

    2007-01-01

    In support the Cranked Arrow Wing Aerodynamic Project International (CAWAPI) to improve the Technology Readiness Level of flow solvers by comparing results with measured F-16XL-1 flight data, NASA Langley employed the TetrUSS unstructured grid solver, USM3D, to obtain solutions for all seven flight conditions of interest. A newly available solver version that incorporates a number of turbulence models, including the two-equation linear and non-linear k-epsilon, was used in this study. As a first test, a choice was made to utilize only a single grid resolution with the solver for the simulation of the different flight conditions. Comparisons are presented with three turbulence models in USM3D, flight data for surface pressure, boundary-layer profiles, and skin-friction results, as well as limited predictions from other solvers. A result of these comparisons is that the USM3D solver can be used in an engineering environment to predict flow physics on a complex configuration at flight Reynolds numbers with a two-equation linear k-epsilon turbulence model.

  9. High-speed civil transport flight- and propulsion-control technological issues

    NASA Technical Reports Server (NTRS)

    Ray, J. K.; Carlin, C. M.; Lambregts, A. A.

    1992-01-01

    Technology advances required in the flight and propulsion control system disciplines to develop a high speed civil transport (HSCT) are identified. The mission and requirements of the transport and major flight and propulsion control technology issues are discussed. Each issue is ranked and, for each issue, a plan for technology readiness is given. Certain features are unique and dominate control system design. These features include the high temperature environment, large flexible aircraft, control-configured empennage, minimizing control margins, and high availability and excellent maintainability. The failure to resolve most high-priority issues can prevent the transport from achieving its goals. The flow-time for hardware may require stimulus, since market forces may be insufficient to ensure timely production. Flight and propulsion control technology will contribute to takeoff gross weight reduction. Similar technology advances are necessary also to ensure flight safety for the transport. The certification basis of the HSCT must be negotiated between airplane manufacturers and government regulators. Efficient, quality design of the transport will require an integrated set of design tools that support the entire engineering design team.

  10. Space Station Cathode Design, Performance, and Operating Specifications

    NASA Technical Reports Server (NTRS)

    Patterson, Michael J.; Verhey, Timothy R.; Soulas, George; Zakany, James

    1998-01-01

    A plasma contactor system was baselined for the International Space Station (ISS) to eliminate/mitigate damaging interactions with the space environment. The system represents a dual-use technology which is a direct outgrowth of the NASA electric propulsion program and, in particular, the technology development efforts on ion thruster systems. The plasma contactor includes a hollow cathode assembly (HCA), a power electronics unit, and a xenon gas feed system. Under a pre-flight development program, these subsystems were taken to the level of maturity appropriate for transfer to U.S. industry for final development. NASA's Lewis Research Center was subsequently requested by ISS to manufacture and deliver the engineering model, qualification model, and flight HCA units. To date, multiple units have been built. One cathode has demonstrated approximately 28,000 hours lifetime, two development unit HCAs have demonstrated over 10,000 hours lifetime, and one development unit HCA has demonstrated more than 32,000 ignitions. All 8 flight HCAs have been manufactured, acceptance tested, and are ready for delivery to the flight contractor. This paper discusses the requirements, mechanical design, performance, operating specifications, and schedule for the plasma contactor flight HCAs.

  11. Cost analysis of oxygen recovery systems

    NASA Technical Reports Server (NTRS)

    Yakut, M. M.

    1973-01-01

    The design and development of equipment for flight use in earth-orbital programs, when optimally approached cost effectively, proceed through the following logical progression: (1) bench testing of breadboard designs, (2) the fabrication and evaluation of prototype equipment, (3) redesign to meet flight-imposed requirements, and (4) qualification and testing of a flight-ready system. Each of these steps is intended to produce the basic design information necessary to progress to the next step. The cost of each step is normally substantially less than that of the following step. An evaluation of the cost elements involved in each of the steps and their impact on total program cost are presented. Cost analyses of four leading oxygen recovery subsystems which include two carbon dioxide reduction subsystem, Sabatier and Bosch, and two water electrolysis subsystems, the solid polymer electrolyte and the circulating KOH electrolyte are described.

  12. Design verification and fabrication of active control systems for the DAST ARW-2 high aspect ratio wing, part 1

    NASA Technical Reports Server (NTRS)

    Mcgehee, C. R.

    1986-01-01

    A study was conducted under Drones for Aerodynamic and Structural Testing (DAST) program to accomplish the final design and hardware fabrication for four active control systems compatible with and ready for installation in the NASA Aeroelastic Research Wing No. 2 (ARW-2) and Firebee II drone flight test vehicle. The wing structure was designed so that Active Control Systems (ACS) are required in the normal flight envelope by integrating control system design with aerodynamics and structure technologies. The DAST ARW-2 configuration uses flutter suppression, relaxed static stability, and gust and maneuver load alleviation ACS systems, and an automatic flight control system. Performance goals and criteria were applied to individual systems and the systems collectively to assure that vehicle stability margins, flutter margins, flying qualities and load reductions are achieved.

  13. Bioreactor design concepts

    NASA Technical Reports Server (NTRS)

    Bowie, William

    1987-01-01

    Two parallel lines of work are underway in the bioreactor laboratory. One of the efforts is devoted to the continued development and utilization of a laboratory research system. That system's design is intended to be fluid and dynamic. The sole purpose of such a device is to allow testing and development of equipment concepts and procedures. Some of the results of those processes are discussed. A second effort is designed to produce a flight-like bioreactor contained in a double middeck locker. The result of that effort has been to freeze a particular bioreactor design in order to allow fabrication of the custom parts. The system is expected to be ready for flight in early 1988. However, continued use of the laboratory system will lead to improvements in the space bioreactor. Those improvements can only be integrated after the initial flight series.

  14. STS-70 Discovery launch before tower clear (fish eye view)

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The fourth Space Shuttle flight of 1995 is off to an all-but- perfect start, as the Shuttle Discovery surges skyward from Launch Pad 39B at 9:41:55.078 a.m. EDT, July 13, 1995. On board for Discovery's 21st spaceflight are a crew of five: Commander Terence 'Tom' Henricks; Pilot Kevin R. Kregel; and Mission Specialists Nancy Jane Currie, Donald A. Thomas and Mary Ellen Weber. Primary objective of Mission STS-70 is to assure the continued readiness of NASA's Tracking and Data Relay Satellite (TDRS) communications network which links Earth-orbiting spacecraft -- including the Shuttle -- with the ground. The 70th Shuttle flight overall also marks the maiden flight of the new Block I Space Shuttle Main Engine configuration designed to increase engine performance as well as safety and reliability.

  15. KSC-2009-2015

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata puts on his helmet as part of the final fitting of his launch and entry suit. Wakata is making his third shuttle flight. He will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  16. Electronics technician Bill Clark assembling a cannon plug with the help of Jim Lewis

    NASA Technical Reports Server (NTRS)

    1991-01-01

    There is always something needed for a NASA aircraft before a research flight can take place. This photo shows William J. Clark working on one of those 'somethings' while Jimmie C. Lewis watches ready to help. Working on a research project is a challenge, for there is no set pattern to follow. From the drawings to the final product there are many people who contribute to that final product -- the flight. The electronic technicians in the Instrumentation Laboratory at NASA Ames-Dryden Flight Research Facility are no exception. Bill Clark is busy creating a cannon plug to be used on the CV-990. He is soldering wires in the appropriate order so the plug will transmit electrical currents correctly when installed in the airplane. Jim stands by to give help and support on the project.

  17. Conceptual Design for a Dual-Bell Rocket Nozzle System Using a NASA F-15 Airplane as the Flight Testbed

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Ruf, Joseph H.; Bui, Trong T.; Martinez, Martel; St. John, Clinton W.

    2014-01-01

    The dual-bell rocket nozzle was first proposed in 1949, offering a potential improvement in rocket nozzle performance over the conventional-bell nozzle. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. In 2013 a proposal was constructed that offered a NASA F-15 airplane as the flight testbed, with the plan to operate a dual-bell rocket nozzle during captive-carried flight. If implemented, this capability will permit nozzle operation into an external flow field similar to that of a launch vehicle, and facilitate an improved understanding of dual-bell nozzle plume sensitivity to external flow-field effects. More importantly, this flight testbed can be utilized to help quantify the performance benefit with the dual-bell nozzle, as well as to advance its technology readiness level. Toward this ultimate goal, this paper provides plans for future flights to quantify the external flow field of the airplane near the nozzle experiment, as well as details on the conceptual design for the dual-bell nozzle cold-flow propellant feed system integration within the NASA F-15 Propulsion Flight Test Fixture. The current study shows that this concept of flight research is feasible, and could result in valuable flight data for the dual-bell nozzle.

  18. Flight Phenology of Two Coptotermes Species (Isoptera: Rhinotermitidae) in Southeastern Florida.

    PubMed

    Chouvenc, Thomas; Scheffrahn, Rudolf H; Mullins, Aaron J; Su, Nan-Yao

    2017-08-01

    The dispersal flight activity ("swarming") of two invasive subterranean termite species, Coptotermes gestroi (Wasmann) and Coptotermes formosanus Shiraki, was monitored in metropolitan southeastern Florida, where both species are now sympatric and major structural pests. Historical records of alates collected in the area showed that the two species have distinct peaks of flight activity, from mid-February to late April for C. gestroi, and from early April to late June for C. formosanus. However, an overlap of the two dispersal flight seasons has been observed since at least 2005. The daily monitoring of dispersal flight events in southeastern Florida in 2014, 2015, and 2016 confirmed that simultaneous flights occurred several times each year. In addition, environmental conditions for favorable flights were identified, and it was established that low temperature was the primary factor inhibiting both species from dispersal flights, while all other factors had little impact on the occurrence of major dispersal flight events. However, both species shared similar temperature requirements for favorable dispersal flight conditions despite distinct peaks of activity over time. The analysis of sex ratios and average weights of the alates suggests that intrinsic colony factors are important for the timing of the maturation of alates, and that once a cohort of individuals is ready to disperse, a flight may occur as soon as the environmental conditions are favorable. © The Authors 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  19. Flight Team Development in Support of LCROSS - A Class D Mission

    NASA Technical Reports Server (NTRS)

    Tompkins, Paul D.; Hunt, Rusty; Bresina, John; Galal, Ken; Shirley, Mark; Munger, James; Sawyer, Scott

    2010-01-01

    The LCROSS (Lunar Crater Observation and Sensing Satellite) project presented a number of challenges to the preparation for mission operations. A class D mission under NASA s risk tolerance scale, LCROSS was governed by a $79 million cost cap and a 29 month schedule from "authority to proceed" to flight readiness. LCROSS was NASA Ames Research Center s flagship mission in its return to spacecraft flight operations after many years of pursuing other strategic goals. As such, ARC needed to restore and update its mission support infrastructure, and in parallel, the LCROSS project had to newly define operational practices and to select and train a flight team combining experienced operators and staff from other arenas of ARC research. This paper describes the LCROSS flight team development process, which deeply involved team members in spacecraft and ground system design, implementation and test; leveraged collaborations with strategic partners; and conducted extensive testing and rehearsals that scaled in realism and complexity in coordination with ground system and spacecraft development. As a testament to the approach, LCROSS successfully met its full mission objectives, despite many in-flight challenges, with its impact on the lunar south pole on October 9, 2009.

  20. Integrated Immune Experiment

    NASA Technical Reports Server (NTRS)

    Crucian, Brian

    2009-01-01

    This viewgraph presentation reviews NASA's Integrated Immune Experiment. The objectives include: 1) Address significant lack of data regarding immune status during flight; 2) Replace several recent immune studies with one comprehensive study that will include in-flight sampling; 3) Determine the in-flight status of immunity, physiological stress, viral immunity/reactivation; 4) Determine the clinical risk related to immune dysregulation for exploration class spaceflight; and 5) Determine the appropriate monitoring strategy for spaceflight-associated immune dysfunction, that could be used for the evaluation of countermeasures.

  1. Crew Exploration Vehicle (CEV) Avionics Integration Laboratory (CAIL) Independent Analysis

    NASA Technical Reports Server (NTRS)

    Davis, Mitchell L.; Aguilar, Michael L.; Mora, Victor D.; Regenie, Victoria A.; Ritz, William F.

    2009-01-01

    Two approaches were compared to the Crew Exploration Vehicle (CEV) Avionics Integration Laboratory (CAIL) approach: the Flat-Sat and Shuttle Avionics Integration Laboratory (SAIL). The Flat-Sat and CAIL/SAIL approaches are two different tools designed to mitigate different risks. Flat-Sat approach is designed to develop a mission concept into a flight avionics system and associated ground controller. The SAIL approach is designed to aid in the flight readiness verification of the flight avionics system. The approaches are complimentary in addressing both the system development risks and mission verification risks. The following NESC team findings were identified: The CAIL assumption is that the flight subsystems will be matured for the system level verification; The Flat-Sat and SAIL approaches are two different tools designed to mitigate different risks. The following NESC team recommendation was provided: Define, document, and manage a detailed interface between the design and development (EDL and other integration labs) to the verification laboratory (CAIL).

  2. Accelerated development and flight evaluation of active controls concepts for subsonic transport aircraft. Volume 1: Load alleviation/extended span development and flight tests

    NASA Technical Reports Server (NTRS)

    Johnston, J. F.

    1979-01-01

    Active wing load alleviation to extend the wing span by 5.8 percent, giving a 3 percent reduction in cruise drag is covered. The active wing load alleviation used symmetric motions of the outboard ailerons for maneuver load control (MLC) and elastic mode suppression (EMS), and stabilizer motions for gust load alleviation (GLA). Slow maneuvers verified the MLC, and open and closed-loop flight frequency response tests verified the aircraft dynamic response to symmetric aileron and stabilizer drives as well as the active system performance. Flight tests in turbulence verified the effectiveness of the active controls in reducing gust-induced wing loads. It is concluded that active wing load alleviation/extended span is proven in the L-1011 and is ready for application to airline service; it is a very practical way to obtain the increased efficiency of a higher aspect ratio wing with minimum structural impact.

  3. The STS-98 crew gathers for snack before launch

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The STS-98 crew gathers around a table for a snack before getting ready for launch on Space Shuttle Atlantis. Seated left to right are Mission Specialist Thomas Jones, Pilot Mark Polansky, Commander Ken Cockrell and Mission Specialists Marsha Ivins and Robert Curbeam. STS-98 is the seventh construction flight to the International Space Station. Atlantis is carrying the U.S. Laboratory Destiny, a key module in the growth of the Space Station. Destiny will be attached to the Unity node on the Space Station using the Shuttle'''s robotic arm. Three spacewalks, by Curbeam and Jones, are required to complete the planned construction work during the 11-day mission. Launch is targeted for 6:11 p.m. EST and the planned landing at KSC Feb. 18 about 1:39 p.m. This mission marks the seventh Shuttle flight to the Space Station, the 23rd flight of Atlantis and the 102nd flight overall in NASA'''s Space Shuttle program.

  4. Measuring readiness for and satisfaction with a hand hygiene e-learning course among healthcare workers in a paediatric oncology centre in Guatemala City

    PubMed Central

    Gonzalez, Miriam L.; Melgar, Mario; Homsi, Maysam; Shuler, Ana; Antillon-Klussmann, Federico; Matheu, Laura; Ramirez, Marylin; Grant, Michael M.; Lowther, Deborah L.; Relyea, George; Caniza, Miguela A.

    2017-01-01

    E-learning has been widely used in the infection control field and has been recommended for use in hand hygiene (HH) programs by the World Health Organization. Such strategies are effective and efficient for infection control, but factors such as learner readiness for this method should be determined to assure feasibility and suitability in low- to middle-income countries. We developed a tailored, e-learning, Spanish-language HH course based on the WHO guidelines for HH in healthcare settings for the pediatric cancer center in Guatemala City. We aimed to identify e-readiness factors that influenced HH course completion and evaluate HCWs’ satisfaction. Pearson’s chi-square test of independence was used to retrospectively compare e-readiness factors and course-completion status (completed, non-completed, and never-started). We surveyed 194 HCWs for e-readiness; 116 HCWs self-enrolled in the HH course, and 55 responded to the satisfaction survey. Most e-readiness factors were statistically significant between course-completion groups. Moreover, students were significantly more likely to complete the course if they had a computer with an Internet connection (P=0.001) and self-reported comfort with using a computer several times a week (p=0.001) and communicating through online technologies (p=0.001). Previous online course experience was not a significant factor (p=0.819). E-readiness score averages varied among HCWs, and mean scores for all e-readiness factors were significantly higher among medical doctors than among nurses. Nearly all respondents to the satisfaction survey agreed that e-learning was as effective as the traditional teaching method. Evaluating HCWs’ e-readiness is essential while integrating technologies into educational programs in low- to middle-income countries. PMID:29147140

  5. Measuring readiness for and satisfaction with a hand hygiene e-learning course among healthcare workers in a paediatric oncology centre in Guatemala City.

    PubMed

    Gonzalez, Miriam L; Melgar, Mario; Homsi, Maysam; Shuler, Ana; Antillon-Klussmann, Federico; Matheu, Laura; Ramirez, Marylin; Grant, Michael M; Lowther, Deborah L; Relyea, George; Caniza, Miguela A

    2016-01-01

    E-learning has been widely used in the infection control field and has been recommended for use in hand hygiene (HH) programs by the World Health Organization. Such strategies are effective and efficient for infection control, but factors such as learner readiness for this method should be determined to assure feasibility and suitability in low- to middle-income countries. We developed a tailored, e-learning, Spanish-language HH course based on the WHO guidelines for HH in healthcare settings for the pediatric cancer center in Guatemala City. We aimed to identify e-readiness factors that influenced HH course completion and evaluate HCWs' satisfaction. Pearson's chi-square test of independence was used to retrospectively compare e-readiness factors and course-completion status (completed, non-completed, and never-started). We surveyed 194 HCWs for e-readiness; 116 HCWs self-enrolled in the HH course, and 55 responded to the satisfaction survey. Most e-readiness factors were statistically significant between course-completion groups. Moreover, students were significantly more likely to complete the course if they had a computer with an Internet connection (P=0.001) and self-reported comfort with using a computer several times a week (p=0.001) and communicating through online technologies (p=0.001). Previous online course experience was not a significant factor (p=0.819). E-readiness score averages varied among HCWs, and mean scores for all e-readiness factors were significantly higher among medical doctors than among nurses. Nearly all respondents to the satisfaction survey agreed that e-learning was as effective as the traditional teaching method. Evaluating HCWs' e-readiness is essential while integrating technologies into educational programs in low- to middle-income countries.

  6. 14 CFR Appendix F to Part 91 - Helicopter Flight Recorder Specifications

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Engine Torque Maximum Range ±5% 1 1%2. Flight Control Hydraulic Pressure Primary (Discrete) High/Low 1 Secondary—if applicable (Discrete) High/Low 1 Radio Transmitter Keying (Discrete) On/Off 1 Autopilot Engaged (Discrete) Engaged or Disengaged 1 SAS Status-Engaged (Discrete) Engaged or Disengaged 1 SAS Fault Status...

  7. Contribution of Psychosocial Factors to Physical Activity in Women of Color in the Saving Lives Staying Active (SALSA) Study.

    PubMed

    Mama, Scherezade K; McNeill, Lorna H; Soltero, Erica G; Orlando Edwards, Raul; Lee, Rebecca E

    2017-07-01

    Culturally appropriate, innovative strategies to increase physical activity (PA) in women of color are needed. This study examined whether participation in SALSA, an 8-week randomized, crossover pilot study to promote PA, led to improved psychosocial outcomes and whether these changes were associated with changes in PA over time. Women of color (N = 50) completed Internet-based questionnaires on PA, exercise self-efficacy, motivational readiness, stress, and social support at three time points. Women reported high socioeconomic status, decreases in exercise self-efficacy, and increases in motivational readiness for exercise and a number of stressful events (p < .05); changes in motivational readiness for exercise varied by group (p = .043). Changes in psychosocial factors were associated with increases in PA. Latin dance improved motivational readiness for PA. Future studies are needed to determine whether Latin dance improves other psychological measures and quality of life in women of color in an effort to increase PA and reduce health disparities.

  8. Readiness in the face of war. [The status of the US Strategic Petroleum Reserve

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodgers, L.M.

    This article reports the status of the US Strategic Petroleum Reserve as described by Secretary James Watkins in the face of the war against Iraq. Secretary James Watkins describes the plan by which over 20 nation's reserves will be tapped to insure no lack of petroleum on the world market. The possibility of sabotage to various oil facilities is addressed.

  9. To amend title 10, United States Code, to provide for the permanent and expanded authority for Army industrial facilities to enter into certain cooperative arrangements with non-Army entities.

    THOMAS, 112th Congress

    Rep. Schilling, Robert T. [R-IL-17

    2011-07-15

    House - 09/20/2011 Referred to the Subcommittee on Readiness. (All Actions) Notes: For further action, see H.R.1540, which became Public Law 112-81 on 12/31/2011. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  10. Proposed Flight Research of a Dual-Bell Rocket Nozzle Using the NASA F-15 Airplane

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Bui, Trong T.; Ruf, Joseph H.

    2013-01-01

    For more than a half-century, several types of altitude-compensating rocket nozzles have been proposed and analyzed, but very few have been adequately tested in a relevant flight environment. One type of altitude-compensating nozzle is the dual-bell rocket nozzle, which was first introduced into literature in 1949. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. This paper proposes a method for conducting testing and research with a dual-bell rocket nozzle in a flight environment. We propose to leverage the existing NASA F-15 airplane and Propulsion Flight Test Fixture as the flight testbed, with the dual-bell nozzle operating during captive-carried flights, and with the nozzle subjected to a local flow field similar to that of a launch vehicle. The primary objective of this effort is not only to advance the technology readiness level of the dual-bell nozzle, but also to gain a greater understanding of the nozzle mode transitional sensitivity to local flow-field effects, and to quantify the performance benefits with this technology. The predicted performance benefits are significant, and may result in reducing the cost of delivering payloads to low-Earth orbit.

  11. Proposed Flight Research of a Dual-Bell Rocket Nozzle Using the NASA F-15 Airplane

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Bui, Trong T.; Ruf, Joseph H.

    2013-01-01

    For more than a half-century, several types of altitude-compensating rocket nozzles have been proposed and analyzed, but very few have been adequately tested in a relevant flight environment. One type of altitude-compensating nozzle is the dual-bell rocket nozzle, which was first introduced into literature in 1949. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. This presentation proposes a method for conducting testing and research with a dual-bell rocket nozzle in a flight environment. We propose to leverage the existing NASA F-15 airplane and Propulsion Flight Test Fixture as the flight testbed, with the dual-bell nozzle operating during captive-carried flights, and with the nozzle subjected to a local flow field similar to that of a launch vehicle. The primary objective of this effort is not only to advance the technology readiness level of the dual-bell nozzle, but also to gain a greater understanding of the nozzle mode transitional sensitivity to local flow-field effects, and to quantify the performance benefits with this technology. The predicted performance benefits are significant, and may result in reducing the cost of delivering payloads to low-Earth orbit.

  12. Status of the District of Columbia Public Schools Readiness for the 1998-1999 School Year. Hearing before the Subcommittee on the District of Columbia of the Committee on Government Reform and Oversight. House of Representatives, One Hundred Fifth Congress, Second Session.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. House Committee on Government Reform and Oversight.

    A Congressional hearing was held to discuss the readiness of the District of Columbia public schools for the 1998-99 school year. In the 1997-98 school year, the District's public schools had not been able to open on time because of repair work that was not completed. After opening remarks by Congress members Thomas M. Davis and Constance Morella,…

  13. A Communications Network for Cislunar Operations

    NASA Technical Reports Server (NTRS)

    Burleigh, Scott

    2012-01-01

    Reliable and efficient communications will be critical to the success of commercial flight operations in cislunar space. The Internet is not well-suited to meeting this requirement. But the Delay-Tolerant Networking (DTN) architecture is. The DTN protocols are well-documented and implementations are mature. We think DTN will be ready to support low-cost, low-risk cislunar networking by the time the vehicles are in place.

  14. Space Food Package - Gemini-Titan (GT)-4 Flight - MSC

    NASA Image and Video Library

    1965-05-01

    Food packages of beef and gravy fully reconstituted and ready to eat. An astronaut would squeeze food through opening at right side of package. Water gun is used to reconstitute dehydrated food. Scissors are used to open packages. This is the type of space food which will be used on the Gemini-Titan 4 spaceflight. MSC, Houston, TX *S65-24895 thru S65-24899

  15. A portable real-time data processing system for standard meteorological radiosondes

    NASA Technical Reports Server (NTRS)

    Staffanson, F. L.

    1983-01-01

    The UMET-1 is a microprocessor-based portable system for automatic real-time processing of flight data transmitted from the standard RAWINSONDE upper atmosphere meteorological balloonsonde. The first 'target system' is described which was designed to receive data from a mobile tracking and telemetry receiving station (TRADAT), as the balloonsonde ascends to apogee. After balloon-burst, the UMET-1 produces user-ready hardcopy.

  16. Crew Skills and Training

    NASA Technical Reports Server (NTRS)

    Jones, Thomas; Burbank, Daniel C.; Eppler, Dean; Garrison, Robert; Harvey, Ralph; Hoffman, Paul; Schmitt, Harrison

    1998-01-01

    One of the major focus points for the workshop was the topic of crew skills and training necessary for the Mars surface mission. Discussions centered on the mix of scientific skills necessary to accomplish the proposed scientific goals, and the training environment that can bring the ground and flight teams to readiness. Subsequent discussion resulted in recommendations for specific steps to begin the process of training an experienced Mars exploration team.

  17. Hang Gliders for Sport

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Hang gliding is growing rapidly. Free Flight produces 1,000 gliders a month and other companies are entering the field. Wing is simple to control, pulling back on control bar allows you to pick up speed and at the same time lowers your altitude. Pushing forward slows your speed and levels you off. Birdmen can choose from prone, upright or swing seat harnesses in either kits or ready-to-fly gliders.

  18. KSC-02pd0087

    NASA Image and Video Library

    2002-01-10

    VANDENBERG AFB, CALIF. -- Technicians ready the Pegasus XL rocket, the vehicle that will launch the High Energy Solar Spectroscopic Imager (HESSI), for flight to Florida. The primary mission of HESSI is to explore the basic physics of particle acceleration and energy release in solar flares. The launch of PegasusXL/HESSI is scheduled for Feb. 5, 2002, from beneath an Orbital Sciences Corp. L-1011 aircraft over the Atlantic Ocean

  19. Robotic Access to Planetary Surfaces Capability Roadmap

    NASA Technical Reports Server (NTRS)

    2005-01-01

    A set of robotic access to planetary surfaces capability developments and supporting infrastructure have been identified. Reference mission pulls derived from ongoing strategic planning. Capability pushes to enable broader mission considerations. Facility and flight test capability needs. Those developments have been described to the level of detail needed for high-level planning. Content and approach. Readiness and metrics. Rough schedule and cost. Connectivity to mission concepts.

  20. Validation of Procedures for Monitoring Crewmember Immune Function

    NASA Technical Reports Server (NTRS)

    Crucian, Brian; Stowe, Raymond; Mehta, Satish; Uchakin, Peter; Quiriarte, Heather; Pierson, Duane; Sams, Clarence

    2008-01-01

    There is ample evidence to suggest that space flight leads to immune system dysregulation. This may be a result of microgravity, confinement, physiological stress, radiation, environment or other mission-associated factors. The clinical risk (if any) from prolonged immune dysregulation during exploration-class space flight has not yet been determined, but may include increased incidence of infection, allergy, hypersensitivity, hematological malignancy or altered wound healing. Each of the clinical events resulting from immune dysfunction has the potential to impact mission critical objectives during exploration-class missions. To date, precious little in-flight immune data has been generated to assess this phenomenon. The majority of recent flight immune studies have been post-flight assessments, which may not accurately reflect the in-flight status of immunity as it resolves over prolonged flight. There are no procedures currently in place to monitor immune function or its effect on crew health. The objective of this Supplemental Medical Objective (SMO) is to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. This SMO will assess immunity, latent viral reactivation and physiological stress during both short and long duration flights. Upon completion, it is expected that any clinical risks resulting from the adverse effects of space flight on the human immune system will have been determined. In addition, a flight-compatible immune monitoring strategy will have been developed with which countermeasures validation could be performed. This study will determine, to the best level allowed by current technology, the in-flight status of crewmembers' immune systems. The in-flight samples will allow a distinction between legitimate in-flight alterations and the physiological stresses of landing and readaptation which are believed to alter R+0 assessments. The overall status of the immune system during flight (activation, deficiency, dysregulation) and the response of the immune system to specific latent virus reactivation (known to occur during space flight) will be thoroughly assessed. The first in-flight activity for integrated immunity very recently occurred during the STS-120 Space Shuttle mission. The protocols functioned well from a technical perspective, and accurate in-flight data was obtained from 1 Shuttle and 2 ISS crewmembers. Crew participation rates for the study continue to be robust.

  1. NASA's Space Launch System: A New Opportunity for CubeSats

    NASA Technical Reports Server (NTRS)

    Hitt, David; Robinson, Kimberly F.; Creech, Stephen D.

    2016-01-01

    Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. Together with the Orion crew vehicle and ground operations at NASA's Kennedy Space Center in Florida, SLS is a foundational capability for NASA's Journey to Mars. From the beginning of the SLS flight program, utilization of the vehicle will also include launching secondary payloads, including CubeSats, to deep-space destinations. Currently, SLS is making rapid progress toward readiness for its first launch in 2018, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight, Exploration Mission-1, SLS will launch an uncrewed test flight of the Orion spacecraft into distant retrograde orbit around the moon. Accompanying Orion on SLS will be 13 CubeSats, which will deploy in cislunar space. These CubeSats will include not only NASA research, but also spacecraft from industry and international partners and potentially academia. Following its first flight and potentially as early as its second, which will launch a crewed Orion spacecraft into cislunar space, SLS will evolve into a more powerful configuration with a larger upper stage. This configuration will initially be able to deliver 105 t to LEO and will continue to be upgraded to a performance of greater than 130 t to LEO. While the addition of the more powerful upper stage will mean a change to the secondary payload accommodations from Block 1, the SLS Program is already evaluating options for future secondary payload opportunities. Early discussions are also already underway for the use of SLS to launch spacecraft on interplanetary trajectories, which could open additional opportunities for CubeSats. This presentation will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the opportunities the vehicle offers for CubeSats and secondary payloads, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018.

  2. 76 FR 22713 - Advisory Committee on the Maternal, Infant and Early Childhood Home Visiting Program Evaluation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... specified in the Affordable Care Act (such as maternal and child health status, school readiness, and domestic violence, among others); (b) the effectiveness of such programs on different populations...

  3. Validation of Procedures for Monitoring Crewmember Immune Function SDBI-1900, SMO-015 - Integrated Immune

    NASA Technical Reports Server (NTRS)

    Crucian, Brian; Stowe, Raymond; Mehta, Satish; Uchakin, Peter; Nehlsen-Cannarella, Sandra; Morukov, Boris; Pierson, Duane; Sams, Clarence

    2007-01-01

    There is ample evidence to suggest that space flight leads to immune system dysregulation. This may be a result of microgravity, confinement, physiological stress, radiation, environment or other mission-associated factors. The clinical risk from prolonged immune dysregulation during space flight are not yet determined, but may include increased incidence of infection, allergy, hypersensitivity, hematological malignancy or altered wound healing. Each of the clinical events resulting from immune dysfunction has the potential to impact mission critical objectives during exploration-class missions. To date, precious little in-flight immune data has been generated to assess this phenomenon. The majority of recent flight immune studies have been post-flight assessments, which may not accurately reflect the in-flight condition. There are no procedures currently in place to monitor immune function or its effect on crew health. The objective of this Supplemental Medical Objective (SMO) is to develop and validate an immune monitoring strategy consistent with operational flight requirements and constraints. This SMO will assess the clinical risks resulting from the adverse effects of space flight on the human immune system and will validate a flight-compatible immune monitoring strategy. Characterization of the clinical risk and the development of a monitoring strategy are necessary prerequisite activities prior to validating countermeasures. This study will determine, to the best level allowed by current technology, the in-flight status of crewmembers immune system. Pre-flight, in-flight and post-flight assessments of immune status, immune function, viral reactivation and physiological stress will be performed. The in-flight samples will allow a distinction between legitimate in-flight alterations and the physiological stresses of landing and readaptation which are believed to alter landing day assessments. The overall status of the immune system during flight (activation, deficiency, dysregulation) and the response of the immune system to specific latent virus reactivation (known to occur during space flight) will be thoroughly assessed. Following completion of the SMO the data will be evaluated to determine the optimal set of assays for routine monitoring of crewmember immune system function, should the clinical risk warrant such monitoring.

  4. Measuring Tropospheric Winds from Space Using a Coherent Doppler Lidar Technique

    NASA Technical Reports Server (NTRS)

    Miller, Timothy L.; Kavaya, Michael J.; Emmitt, G. David

    1999-01-01

    The global measurement of tropospheric wind profiles has been cited by the operational meteorological community as the most important missing element in the present and planned observing system. The most practical and economical method for obtaining this measurement is from low earth orbit, utilizing a Doppler lidar (laser radar) technique. Specifically, this paper will describe the coherent Doppler wind lidar (CDWL) technique, the design and progress of a current space flight project to fly such a system on the Space Shuttle, and plans for future flights of similar instruments. The SPARCLE (SPAce Readiness Coherent Lidar Experiment) is a Shuttle-based instrument whose flight is targeted for March, 2001. The objectives of SPARCLE are three-fold: Confirm that the coherent Doppler lidar technique can measure line-of-sight winds to within 1-2 m/s accuracy; Collect data to permit validation and improvement of instrument performance models to enable better design of future missions; and Collect wind and backscatter data for future mission optimization and for atmospheric studies. These objectives reflect the nature of the experiment and its program sponsor, NASA's New Millennium Program. The experiment is a technology validation mission whose primary purpose is to provide a space flight validation of this particular technology. (It should be noted that the CDWL technique has successfully been implemented from ground-based and aircraft-based platforms for a number of years.) Since the conduct of the SPARCLE mission is tied to future decisions on the choice of technology for free-flying, operational missions, the collection of data is intrinsically tied to the validation and improvement of instrument performance models that predict the sensitivity and accuracy of any particular present or future instrument system. The challenges unique to space flight for an instrument such as SPARCLE and follow-ons include: Obtaining the required lidar sensitivity from the long distance of orbit height to the lower atmosphere; Maintaining optical alignments after launch to orbit, and during operations in "microgravity"; Obtaining pointing knowledge of sufficient accuracy to remove the speed of the spacecraft (and the rotating Earth) from the measurements; Providing sufficient power (not a problem on the Shuttle) and cooling to the instrument. The paper will describe the status and challenges of the SPARCLE project, the value of obtaining wind data from orbit, and will present a roadmap to future instruments for scientific research and operational meteorology.

  5. Advanced Passive Microwave Radiometer Technology for GPM Mission

    NASA Technical Reports Server (NTRS)

    Smith, Eric A.; Im, Eastwood; Kummerow, Christian; Principe, Caleb; Ruf, Christoper; Wilheit, Thomas; Starr, David (Technical Monitor)

    2002-01-01

    An interferometer-type passive microwave radiometer based on MMIC receiver technology and a thinned array antenna design is being developed under the Instrument Incubator Program (TIP) on a project entitled the Lightweight Rainfall Radiometer (LRR). The prototype single channel aircraft instrument will be ready for first testing in 2nd quarter 2003, for deployment on the NASA DC-8 aircraft and in a ground configuration manner; this version measures at 10.7 GHz in a crosstrack imaging mode. The design for a two (2) frequency preliminary space flight model at 19 and 35 GHz (also in crosstrack imaging mode) has also been completed, in which the design features would enable it to fly in a bore-sighted configuration with a new dual-frequency space radar (DPR) under development at the Communications Research Laboratory (CRL) in Tokyo, Japan. The DPR will be flown as one of two primary instruments on the Global Precipitation Measurement (GPM) mission's core satellite in the 2007 time frame. The dual frequency space flight design of the ERR matches the APR frequencies and will be proposed as an ancillary instrument on the GPM core satellite to advance space-based precipitation measurement by enabling better microphysical characterization and coincident volume data gathering for exercising combined algorithm techniques which make use of both radar backscatter and radiometer attenuation information to constrain rainrate solutions within a physical algorithm context. This talk will discuss the design features, performance capabilities, applications plans, and conical/polarametric imaging possibilities for the LRR, as well as a brief summary of the project status and schedule.

  6. Status and Perspectives of the INFN-LNS In-Flight Fragment Separator

    NASA Astrophysics Data System (ADS)

    Russotto, P.; Calabretta, L.; Cardella, G.; Cosentino, G.; De Filippo, E.; Gnoffo, B.; La Cognata, M.; Martorana, N. S.; Pagano, E. V.; Pizzone, R. G.; Quattrocchi, L.; Romano, S.; Russo, A. D.; Santonocito, D.

    2018-05-01

    In the last 15 years the FRIBs@LNS facility has successfully produced Radioactive Ion Beams using the In-Flight technique. We report on the current status and future perspectives opened by FRAISE, a new fragment separator that will be build in connection with the upgrade of Superconducting Cyclotron of the INFN-LNS laboratories.

  7. Autonomous Precision Landing and Hazard Avoidance Technology (ALHAT) Project Status as of May 2010

    NASA Technical Reports Server (NTRS)

    Striepe, Scott A.; Epp, Chirold D.; Robertson, Edward A.

    2010-01-01

    This paper includes the current status of NASA s Autonomous precision Landing and Hazard Avoidance Technology (ALHAT) Project. The ALHAT team has completed several flight tests and two major design analysis cycles. These tests and analyses examine terrain relative navigation sensors, hazard detection and avoidance sensors and algorithms, and hazard relative navigation algorithms, and the guidance and navigation system using these ALHAT functions. The next flight test is scheduled for July 2010. The paper contains results from completed flight tests and analysis cycles. ALHAT system status, upcoming tests and analyses is also addressed. The current ALHAT plans as of May 2010 are discussed. Application of the ALHAT system to landing on bodies other than the Moon is included

  8. Hitching a ride on NASA's B-52 mother ship, the X-43A scramjet performed a captive carry evaluation flight from Edwards Air Force Base, California, January 26, 2004

    NASA Image and Video Library

    2004-01-26

    Hitching a ride on the same B-52 mother ship that once launched X-15 research aircraft in the 1960s, NASA's X-43A scramjet and it's Pegasus booster rocket performed a captive carry evaluation flight from Edwards Air Force Base, California, January 26, 2004. The X-43 and it's booster remained mated to the B-52 throughout this mission, intended to check its readiness for launch. The hydrogen-fueled aircraft is autonomous and has a wingspan of approximately 5 feet, measures 12 feet long and weighs about 2,800 pounds.

  9. Transient loads analysis for space flight applications

    NASA Technical Reports Server (NTRS)

    Thampi, S. K.; Vidyasagar, N. S.; Ganesan, N.

    1992-01-01

    A significant part of the flight readiness verification process involves transient analysis of the coupled Shuttle-payload system to determine the low frequency transient loads. This paper describes a methodology for transient loads analysis and its implementation for the Spacelab Life Sciences Mission. The analysis is carried out using two major software tools - NASTRAN and an external FORTRAN code called EZTRAN. This approach is adopted to overcome some of the limitations of NASTRAN's standard transient analysis capabilities. The method uses Data Recovery Matrices (DRM) to improve computational efficiency. The mode acceleration method is fully implemented in the DRM formulation to recover accurate displacements, stresses, and forces. The advantages of the method are demonstrated through a numerical example.

  10. KSC-05PD-0179

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. Workers accompany the Crawler Transporter that will move Space Shuttle Discovery to the launch pad for Return to Flight as it demonstrates its readiness for weight bearing by carrying an unloaded 8,230,000-pound Mobile Launch Platform along the crawlerway. Its first road test on Jan. 21, following the replacement of all its shoes, was a success. Cracks appeared in the crawlers' shoes in recent years, spurring a need for replacement. The new manufacturer, in Duluth, Minn., has improved the design for a safe Return to Flight and use through the balance of the Space Shuttle Program. Each crawler has 456 shoes, 57 per belt (8 belts in all). Each shoe weighs 2,200 pounds.

  11. KSC-05PD-0177

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. The Crawler Transporter that will move Space Shuttle Discovery to the launch pad for Return to Flight demonstrates its readiness for weight bearing by carrying an unloaded 8,230,000-pound Mobile Launch Platform along the crawlerway. Its first road test on Jan. 21, following the replacement of all its shoes, was a success. Cracks appeared in the crawlers' shoes in recent years, spurring a need for replacement. The new manufacturer, in Duluth, Minn., has improved the design for a safe Return to Flight and use through the balance of the Space Shuttle Program. Each crawler has 456 shoes, 57 per belt (8 belts in all). Each shoe weighs 2,200 pounds.

  12. KSC-05PD-0178

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. New shoes adorn the Crawler Transporter that will move Space Shuttle Discovery to the launch pad for Return to Flight as it demonstrates its readiness for weight bearing by moving an unloaded 8,230,000-pound Mobile Launch Platform along the crawlerway. Its first road test on Jan. 21, following the replacement of all its shoes, was a success. Cracks appeared in the crawlers' shoes in recent years, spurring a need for replacement. The new manufacturer, in Duluth, Minn., has improved the design for a safe Return to Flight and use through the balance of the Space Shuttle Program. Each crawler has 456 shoes, 57 per belt (8 belts in all). Each shoe weighs 2,200 pounds.

  13. STS-96 FD Highlights and Crew Activities Report: Flight Day 01

    NASA Technical Reports Server (NTRS)

    1999-01-01

    On this first day of the STS-96 Discovery mission, the flight crew, Commander Kent V. Rominger, Pilot Rick D. Husband, and Mission Specialists Ellen Ochoa, Tamara E. Jernigan, Daniel T. Barry, Julie Payette, and Valery Ivanovich Tokarev are seen performing pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the 'white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters.

  14. STS-91 Flight Day 1 Highlights and Crew Activities Report

    NASA Technical Reports Server (NTRS)

    1998-01-01

    On this first day of the STS-91 mission, the flight crew, Cmdr. Charles J. Precourt, Pilot Dominic L. Pudwill Gorie, and Mission Specialists Franklin R. Chang-Diaz, Janet Lynn Kavandi, Wendy B. Lawrence, Valery Victorovitch Ryumin and Andrew S. W. Thomas, can be seen performing pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the 'white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters.

  15. STS-81 Flight Day 1

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This first day of the STS-81 mission begins with the flight crew, Cmdr. Michael A. Baker, Pilot Brent W. Jett, Mission Specialists, John M. Grunsfeld, Marsha S. Ivins, Peter J.K. Wisoff, and Jerry M. Linenger, performing pre-launch activities such as eating the traditional breakfast, being suited-up, and riding out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the 'white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including the countdown, engine ignition, and launch. The film ends with the separation of the Solid Rocket Boosters (SRB) from the shuttle.

  16. KSC-04pd0545

    NASA Image and Video Library

    2004-03-17

    KENNEDY SPACE CENTER, FLA. - In the middeck of Endeavour, in the Orbiter Processing Facility, Center Director Jim Kennedy (far left) watches as a technician gets ready to lower himself through the LiOH door into the Environmental Control and Life Support System (ECLSS) bay. LiOH refers to lithium hydroxide, canisters of which are stored in the ECLSS bay under the middeck floor. During flight, cabin air from the cabin fan is ducted to two LiOH canisters, where carbon dioxide is removed and activated charcoal removes odors and trace contaminants. Kennedy is taking an opportunity to learn first-hand what workers are doing to enable Return to Flight. Endeavour is in an Orbiter Major Modification period.

  17. KSC-2009-2017

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Richard Arnold gets help from a suit technician in the final fitting of his launch and entry suit. Arnold will be making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  18. KSC-2009-2018

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist John Phillips has a final fitting of his launch and entry suit and the helmet. Phillips is making his third shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  19. KSC-2009-2013

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Joseph Acaba has a final fitting of his launch and entry suit. Acaba is making his first shuttle flight. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  20. Interim Cryogenic Propulsion Stage (ICPS) Prep for Transport fro

    NASA Image and Video Library

    2017-07-25

    The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is packed inside a canister and ready to be moved from the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.

  1. NASA's telemedicine testbeds: Commercial benefit

    NASA Astrophysics Data System (ADS)

    Doarn, Charles R.; Whitten, Raymond

    1998-01-01

    The National Aeronautics and Space Administration (NASA) has been developing and applying telemedicine to support space flight since the Agency's beginning. Telemetry of physiological parameters from spacecraft to ground controllers is critical to assess the health status of humans in extreme and remote environments. Requisite systems to support medical care and maintain readiness will evolve as mission duration and complexity increase. Developing appropriate protocols and procedures to support multinational, multicultural missions is a key objective of this activity. NASA has created an Agency-wide strategic plan that focuses on the development and integration of technology into the health care delivery systems for space flight to meet these challenges. In order to evaluate technology and systems that can enhance inflight medical care and medical education, NASA has established and conducted several testbeds. Additionally, in June of 1997, NASA established a Commercial Space Center (CSC) for Medical Informatics and Technology Applications at Yale University School of Medicine. These testbeds and the CSC foster the leveraging of technology and resources between government, academia and industry to enhance health care. This commercial endeavor will influence both the delivery of health care in space and on the ground. To date, NASA's activities in telemedicine have provided new ideas in the application of telecommunications and information systems to health care. NASA's Spacebridge to Russia, an Internet-based telemedicine testbed, is one example of how telemedicine and medical education can be conducted using the Internet and its associated tools. Other NASA activities, including the development of a portable telemedicine workstation, which has been demonstrated on the Crow Indian Reservation and in the Texas Prison System, show promise in serving as significant adjuncts to the delivery of health care. As NASA continues to meet the challenges of space flight, the technologies adapted to support humans in extreme and remote environments, and the resultant protocols and procedures will further evolve the commercial practice of medicine and thereby enhance life on Earth.

  2. The Tobacco Control Network's Policy Readiness and Stage of Change Assessment: What the Results Suggest for Moving Tobacco Control Efforts Forward at the State and Territorial Levels.

    PubMed

    Roeseler, April; Solomon, Madeleine; Beatty, Carissa; Sipler, Alison M

    2016-01-01

    The Tobacco Control Network (TCN) is comprised of the tobacco control programs in the health departments of states, territories, and the District of Columbia. During the assessment period, the TCN was managed by the Tobacco Technical Assistance Consortium at Emory University. To assess the readiness of state and territory tobacco control programs to work on evidence-based, promising policy and system change strategies aimed at preventing and reducing tobacco use and secondhand smoke exposure. The Policy Readiness and Stage of Change Assessment was a Web-based survey fielded in September 2013, which was based on the Community Readiness Model. Fifty-nine comprehensive tobacco control programs. State and territory tobacco control program managers and their internal and external partners. The TCN's 2012 Policy Platform recommendations were used as the basis to assess state/territory readiness to adopt and implement evidence-based and promising tobacco control policy/system change strategies. Sixteen tobacco control strategies were rated on: (1) implementation status, (2) readiness, (3) stage of change, and (4) the appropriate level of action for work on the strategy. The 3 strategies with the highest readiness scores were as follows: (1) 100% smoke-free air in workplaces (64%), (2) tobacco-free schools (61%), and (3) $1.50 or less cigarette tax with funds to tobacco control (53%). The 3 strategies with lowest readiness scores were: 1) coupon redemption (17%), 2) tobacco mitigation fee (14%), and 3) disclosure or sunshine laws (8%). Readiness to work on tobacco control strategies varied by region and strategy. Many states/territories are ready to work on strategies for which there is less evidence of a population-level impact for reducing tobacco use, but which contribute to denormalizing tobacco use. Working toward less impactful policies may build support, capacity, and policy success, laying an important foundation to achieve more impactful strategies.

  3. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1992-01-01

    ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

  4. General view of the middeck area looking forward and starboard. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view of the mid-deck area looking forward and starboard. On the far left of the images are the avionics equipment bays. During missions the forward avionics bays would be fronted by lockers for mission equipment and the flight crew's personal equipment. Sleep stations would be located along the far wall if the orbiter was in a flight ready configuration. The hose and ladder on the right side of the image are pieces of ground support equipment. The hose is part of the climate control apparatus used while orbiters are being processed. The ladder is used to access the inter-deck passage, leading to the flight deck, while the orbiter is in 1g (earth's gravity). This view was taken in the Orbiter Processing Facility at the Kennedy Space Center. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX

  5. Design verification and fabrication of active control systems for the DAST ARW-2 high aspect ratio wing. Part 2: Appendices

    NASA Technical Reports Server (NTRS)

    Mcgehee, C. R.

    1986-01-01

    This is Part 2-Appendices of a study conducted under Drones for Aerodynamic and Structural Testing (DAST) Program to accomplish the final design and hardware fabrication for four active control systems compatible with and ready for installation in the NASA Aeroelastic Research Wing No. 2 (ARW-2) and Firebee II drone flight test vehicle. The wing structure was designed so that Active Control Systems (ACS) are required in the normal flight envelope by integrating control system design with aerodynamics and structure technologies. The DAST ARW-2 configuration uses flutter suppression, relaxed static stability, and gust and maneuver load alleviation ACS systems, and an automatic flight control system. Performance goals and criteria were applied to individual systems and the systems collectively to assure that vehicle stability margins, flutter margins, flying qualities, and load reductions were achieved.

  6. Report by the Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The process of preparation for the first two shuttle flights was observed and information from both flights was gathered in order to confirm the concept and performance of the major elements of the space transportation system. To achieve truly operational operating safety, regularity, and minimum practical cost, the organization of efforts between the R&D community and any transportation service organization should be clearly separated with the latter organization assuming responsibilities for marketing its services; planning and acquiring prime hardware and spares; maintainance; certification of procedures; training; and creation of requirements for future development. A technical audit of the application of redundancy concepts to shuttle systems is suggested. The state of the art of space transportation hardware suggests that a number of concept changes may improve reliability, costs, and operational safety. For the remaining R&D flights, it is suggested that a redline audit be made of limits that should not be exceeded for ready to launch.

  7. KSC-2009-2105

    NASA Image and Video Library

    2009-03-15

    CAPE CANAVERAL, Fla. – In Firing Room 4 of the Launch Control Center at NASA's Kennedy Space Center in Florida, from left, Steve Stich, manager of the Kennedy Orbiter Project Office; John Fraser, with Boeing Co. at the Marshall Space Flight Center; Rick Russell, with the NASA Orbiter Sustaining Engineering Office; and Rene Ortega with Marshall Space Flight Center's Shuttle Propulsion Office, are presented with a plaque for their work on the fuel control valve problem on space shuttle Discovery. The award was presented after the successful launch of Discovery on the STS-119 mission. Liftoff was on time at 7:43 p. m. EDT. The STS-119 mission is the 28th to the space station and Discovery's 36th flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Photo credit: NASA/Kim Shiflett

  8. Living with a Grandparent and Parent in Early Childhood: Associations with School Readiness and Differences by Demographic Characteristics

    PubMed Central

    Pilkauskas, Natasha V.

    2016-01-01

    Despite the increasing prevalence of three-generation family households (grandparent, parent, child), relatively little research has studied these households during early childhood. Using nationally representative data from the Early Childhood Longitudinal Study – Birth Cohort (N∼6,550), this study investigates the associations between three-generation coresidence in early childhood and school readiness, and how the associations differ by maternal age, race/ethnicity, nativity, relationship status and poverty. For the full sample of children, no associations between three-generation coresidence and school readiness were found. Analyses by demographic characteristics found that race/ethnicity and nativity moderate the associations; whereas maternal age, relationship status and poverty do not. The findings suggest that three-generation coresidence was associated with lower levels of expressive language for White, Asian and Black children, but more expressive language for Hispanic children. Coresidence was also associated with more externalizing behavior for White and American Indian/Alaskan Native children but less externalizing behavior for Hispanic and Black children. Analyses by maternal nativity found that for children of immigrant mothers, three-generation coresidence was associated with more expressive language and less externalizing and internalizing behavior. Interactions between race/ethnicity and nativity found that the positive associations for Hispanic children were concentrated among children of immigrant parents. No differences were found between grandmother-only and grandmother/grandfather three-generation family households. Overall the findings suggest there may be heterogeneity by race/ethnicity and nativity in the associations between three-generation coresidence and school readiness. PMID:25365124

  9. Magnesium and Space Flight

    PubMed Central

    Smith, Scott M.; Zwart, Sara R.

    2015-01-01

    Magnesium is an essential nutrient for muscle, cardiovascular, and bone health on Earth, and during space flight. We sought to evaluate magnesium status in 43 astronauts (34 male, 9 female; 47 ± 5 years old, mean ± SD) before, during, and after 4–6-month space missions. We also studied individuals participating in a ground analog of space flight (head-down-tilt bed rest; n = 27 (17 male, 10 female), 35 ± 7 years old). We evaluated serum concentration and 24-h urinary excretion of magnesium, along with estimates of tissue magnesium status from sublingual cells. Serum magnesium increased late in flight, while urinary magnesium excretion was higher over the course of 180-day space missions. Urinary magnesium increased during flight but decreased significantly at landing. Neither serum nor urinary magnesium changed during bed rest. For flight and bed rest, significant correlations existed between the area under the curve of serum and urinary magnesium and the change in total body bone mineral content. Tissue magnesium concentration was unchanged after flight and bed rest. Increased excretion of magnesium is likely partially from bone and partially from diet, but importantly, it does not come at the expense of muscle tissue stores. While further study is needed to better understand the implications of these findings for longer space exploration missions, magnesium homeostasis and tissue status seem well maintained during 4–6-month space missions. PMID:26670248

  10. Magnesium and Space Flight.

    PubMed

    Smith, Scott M; Zwart, Sara R

    2015-12-08

    Magnesium is an essential nutrient for muscle, cardiovascular, and bone health on Earth, and during space flight. We sought to evaluate magnesium status in 43 astronauts (34 male, 9 female; 47 ± 5 years old, mean ± SD) before, during, and after 4-6-month space missions. We also studied individuals participating in a ground analog of space flight (head-down-tilt bed rest; n = 27 (17 male, 10 female), 35 ± 7 years old). We evaluated serum concentration and 24-h urinary excretion of magnesium, along with estimates of tissue magnesium status from sublingual cells. Serum magnesium increased late in flight, while urinary magnesium excretion was higher over the course of 180-day space missions. Urinary magnesium increased during flight but decreased significantly at landing. Neither serum nor urinary magnesium changed during bed rest. For flight and bed rest, significant correlations existed between the area under the curve of serum and urinary magnesium and the change in total body bone mineral content. Tissue magnesium concentration was unchanged after flight and bed rest. Increased excretion of magnesium is likely partially from bone and partially from diet, but importantly, it does not come at the expense of muscle tissue stores. While further study is needed to better understand the implications of these findings for longer space exploration missions, magnesium homeostasis and tissue status seem well maintained during 4-6-month space missions.

  11. Differences in Discipline Consequence Assignments by Ethnicity/Race and Economic Status for Texas Grade 6, 7, and 8 Girls: A Statewide Analysis

    ERIC Educational Resources Information Center

    Coleman, Crystal L.

    2017-01-01

    Purpose: The purpose of this journal-ready dissertation was to examine the extent to which differences were present in discipline consequence assignments by the ethnicity/race and economic status for Grade 6, 7, and 8 girls in Texas. In the first investigation, the degree to which discipline consequence assignments differed by the ethnicity/race…

  12. A bill to require the conveyance of certain public land within the boundaries of Camp Williams, Utah, to support the training and readiness of the Utah National Guard.

    THOMAS, 113th Congress

    Sen. Lee, Mike [R-UT

    2013-11-19

    Senate - 11/19/2013 Read twice and referred to the Committee on Energy and Natural Resources. (All Actions) Notes: For further action, see H.R.3304, which became Public Law 113-66 on 12/26/2013. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  13. Parent Involvement in the Getting Ready for School Intervention Is Associated With Changes in School Readiness Skills.

    PubMed

    Marti, Maria; Merz, Emily C; Repka, Kelsey R; Landers, Cassie; Noble, Kimberly G; Duch, Helena

    2018-01-01

    The role of parent involvement in school readiness interventions is not well-understood. The Getting Ready for School (GRS) intervention is a novel program that has both home and school components and aims to improve early literacy, math, and self-regulatory skills in preschool children from socioeconomically disadvantaged families. In this study, we first examined associations between family characteristics and different indices of parent involvement in the GRS intervention. We then examined associations between parent involvement and change in children's school readiness skills over time. Participants were 133 preschool children attending Head Start and their parents who participated in the GRS intervention during the academic year 2014-2015. Parent involvement was operationalized as attendance to GRS events at the school, time spent at home doing GRS activities, and usage of digital program materials, which included a set of videos to support the implementation of parent-child activities at home. Although few family characteristics were significantly associated with parent involvement indices, there was a tendency for some markers of higher socioeconomic status to be linked with greater parent involvement. In addition, greater parent involvement in the GRS intervention was significantly associated with greater gains in children's early literacy, math, and self-regulatory skills. These findings suggest that parent involvement in comprehensive early interventions could be beneficial in terms of improving school readiness for preschoolers from disadvantaged families.

  14. Parent Involvement in the Getting Ready for School Intervention Is Associated With Changes in School Readiness Skills

    PubMed Central

    Marti, Maria; Merz, Emily C.; Repka, Kelsey R.; Landers, Cassie; Noble, Kimberly G.; Duch, Helena

    2018-01-01

    The role of parent involvement in school readiness interventions is not well-understood. The Getting Ready for School (GRS) intervention is a novel program that has both home and school components and aims to improve early literacy, math, and self-regulatory skills in preschool children from socioeconomically disadvantaged families. In this study, we first examined associations between family characteristics and different indices of parent involvement in the GRS intervention. We then examined associations between parent involvement and change in children's school readiness skills over time. Participants were 133 preschool children attending Head Start and their parents who participated in the GRS intervention during the academic year 2014–2015. Parent involvement was operationalized as attendance to GRS events at the school, time spent at home doing GRS activities, and usage of digital program materials, which included a set of videos to support the implementation of parent-child activities at home. Although few family characteristics were significantly associated with parent involvement indices, there was a tendency for some markers of higher socioeconomic status to be linked with greater parent involvement. In addition, greater parent involvement in the GRS intervention was significantly associated with greater gains in children's early literacy, math, and self-regulatory skills. These findings suggest that parent involvement in comprehensive early interventions could be beneficial in terms of improving school readiness for preschoolers from disadvantaged families. PMID:29904362

  15. Career readiness and externalizing behaviors of children affected by maternal HIV/AIDS: 15-year outcomes of the PACT study.

    PubMed

    Murphy, Debra A; Marelich, William D; Herbeck, Diane M; Cook, Mekeila

    2016-01-01

    The purpose of this 15-year longitudinal study was to assess the effects of maternal HIV/AIDS on child/adolescent career readiness and externalizing behaviors. Interviews were conducted with 66 pairs of healthy children and their mothers living with HIV/AIDS (MLH), who are participants in the Parents And children Coping Together (PACT) project begun in 1997. All study participants were English or Spanish speaking. About half (48.5%) of the youth were female. Maternal health status (e.g., viral load biomedical marker, illness symptoms, physical functioning and depression) and child/adolescent outcomes (e.g., career readiness, conduct disorder, drug use, sexual behaviors, parent attachment and youth autonomy) were assessed over 20 time-points. Individual growth and GEE logistic regression models showed lower variability in maternal viral load was positively associated with better career readiness and parent attachment among adolescent/young adults. Externalizing behaviors (conduct disorder, alcohol and crystal methamphetamine use) were positively associated with maternal depression. Adolescent coping efficacy was shown to be a protective factor when applied to models on career readiness. Stability in MLH health positively affects children's career readiness over time, particularly career planning and career choices. The finding that adolescent coping efficacy may act as a protective factor against poor career planning has important implications for developing interventions to assist children in coping with parental HIV.

  16. Career readiness and externalizing behaviors of children affected by maternal HIV/AIDS: 15-year outcomes of the PACT study

    PubMed Central

    Murphy, Debra A.; Marelich, William D.; Herbeck, Diane M.; Cook, Mekeila

    2017-01-01

    The purpose of this 15-year longitudinal study was to assess the effects of maternal HIV/AIDS on child/adolescent career readiness and externalizing behaviors. Interviews were conducted with 66 pairs of healthy children and their mothers living with HIV/AIDS (MLH), who are participants in the Parents And children Coping Together (PACT) project begun in 1997. All study participants were English or Spanish speaking. About half (48.5%) of the youth were female. Maternal health status (e.g., viral load biomedical marker, illness symptoms, physical functioning and depression) and child/adolescent outcomes (e.g., career readiness, conduct disorder, drug use, sexual behaviors, parent attachment and youth autonomy) were assessed over 20 time-points. Individual growth and GEE logistic regression models showed lower variability in maternal viral load was positively associated with better career readiness and parent attachment among adolescent/young adults. Externalizing behaviors (conduct disorder, alcohol and crystal methamphetamine use) were positively associated with maternal depression. Adolescent coping efficacy was shown to be a protective factor when applied to models on career readiness. Stability in MLH health positively affects children’s career readiness over time, particularly career planning and career choices. The finding that adolescent coping efficacy may act as a protective factor against poor career planning has important implications for developing interventions to assist children in coping with parental HIV. PMID:28983322

  17. Acoustics Critical Readiness Review

    NASA Technical Reports Server (NTRS)

    Ballard, Kenny

    2010-01-01

    This presentation reviews the status of the acoustic equipment from the medical operations perspective. Included is information about the acoustic dosimeters, sound level meter, and headphones that are planned for use while on orbit. Finally there is information about on-orbit hearing assessments.

  18. Accomplishments of the Abrupt Wing Stall (AWS) Program and Future Research Requirements

    NASA Technical Reports Server (NTRS)

    Hall, Robert M.; Woodson, Shawn H.; Chambers, Joseph R.

    2003-01-01

    The Abrupt Wing Stall (AWS) Program has addressed the problem of uncommanded lateral motions, such as wing drop and wing rock, at transonic speeds. The genesis of this Program was the experience of the F/A-1 8E/F Program in the late 1990's, when wing drop was discovered in the heart of the maneuver envelope for the pre-production aircraft. While the F/A-1 8E/F problem was subsequently corrected by a leading-edge flap scheduling change and the addition of a porous door to the wing fold fairing, the AWS Program was initiated as a national response to the lack of technology readiness available at the time of the F/A-18E/F Development Program. The AWS Program objectives were to define causal factors for the F/A-18E/F experience, to gain insights into the flow physics associated with wing drop, and to develop methods and analytical tools so that future programs could identify this type of problem before going to flight test. The paper reviews, for the major goals of the AWS Program, the status of the technology before the

  19. Propulsion Integrated Vehicle Health Management Technology Experiment (PITEX) Conducted

    NASA Technical Reports Server (NTRS)

    Maul, William A.; Chicatelli, Amy K.; Fulton, Christopher E.

    2004-01-01

    The Propulsion Integrated Vehicle Health Management (IVHM) Technology Experiment (PITEX) is a continuing NASA effort being conducted cooperatively by the NASA Glenn Research Center, the NASA Ames Research Center, and the NASA Kennedy Space Center. It was a key element of a Space Launch Initiative risk-reduction task performed by the Northrop Grumman Corporation in El Segundo, California. PITEX's main objectives are the continued maturation of diagnostic technologies that are relevant to second generation reusable launch vehicle (RLV) subsystems and the assessment of the real-time performance of the PITEX diagnostic solution. The PITEX effort has considerable legacy in the NASA IVHM Technology Experiment for X-vehicles (NITEX) that was selected to fly on the X-34 subscale RLV that was being developed by Orbital Sciences Corporation. NITEX, funded through the Future-X Program Office, was to advance the technology-readiness level of selected IVHM technologies within a flight environment and to begin the transition of these technologies from experimental status into RLV baseline designs. The experiment was to perform realtime fault detection and isolation and suggest potential recovery actions for the X-34 main propulsion system (MPS) during all mission phases by using a combination of system-level analysis and detailed diagnostic algorithms.

  20. KSC-2012-5688

    NASA Image and Video Library

    2012-10-06

    CAPE CANAVERAL, Fla. -- Sam Scimemi, director of International Space Station at NASA Headquarters, participates in a prelaunch news conference in Kennedy Space Center's Press Site auditorium in Florida. Also pictured are, from left, Michael Curie, NASA Public Affairs, Bob Cabana, director of NASA Kennedy Space Center, and to Scimemi's right, Mike Suffredini, program manager of International Space Station at NASA Johnson Space Center. The news conference provided the media with a status on the readiness to launch NASA's first Commercial Resupply Services, or CRS-1, mission to the International Space Station. Space Exploration Technologies Corp., or SpaceX, built both the mission's Falcon 9 rocket and Dragon capsule. Launch is scheduled for 8:35 p.m. EDT on Oct. 7 from Space Launch Complex 40 on Cape Canaveral Air Force Station. SpaceX CRS-1 is an important step toward making America’s microgravity research program self-sufficient by providing a way to deliver and return significant amounts of cargo, including science experiments, to and from the orbiting laboratory. NASA has contracted for 12 commercial resupply flights from SpaceX and eight from the Orbital Sciences Corp. For more information, visit http://www.nasa.gov/mission_pages/station/living/launch/index.html. Photo credit: NASA/Jim Grossmann

  1. Conceptual Design for a Dual-Bell Rocket Nozzle System Using a NASA F-15 Airplane as the Flight Testbed

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Ruf, Joseph H.; Bui, Trong T.; Martinez, Martel; St. John, Clinton W.

    2014-01-01

    The dual-bell rocket nozzle was first proposed in 1949, offering a potential improvement in rocket nozzle performance over the conventional-bell nozzle. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. In 2013 a proposal was constructed that offered a NASA F-15 airplane as the flight testbed, with the plan to operate a dual-bell rocket nozzle during captive-carried flight. If implemented, this capability will permit nozzle operation into an external flow field similar to that of a launch vehicle, and facilitate an improved understanding of dual-bell nozzle plume sensitivity to external flow-field effects. More importantly, this flight testbed can be utilized to help quantify the performance benefit with the dual-bell nozzle, as well as to advance its technology readiness level. This presentation provides highlights of a technical paper that outlines this ultimate goal, including plans for future flights to quantify the external flow field of the airplane near the nozzle experiment, as well as details on the conceptual design for the dual-bell nozzle cold-flow propellant feed system integration within the NASA F-15 Propulsion Flight Test Fixture. The current study shows that this concept of flight research is feasible, and could result in valuable flight data for the dual-bell nozzle.

  2. Conceptual Design for a Dual-Bell Rocket Nozzle System Using a NASA F-15 Airplane as the Flight Testbed

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Ruf, Joseph H.; Bui, Trong T.; Martinez, Martel; St. John, Clinton W.

    2014-01-01

    The dual-bell rocket nozzle was first proposed in 1949, offering a potential improvement in rocket nozzle performance over the conventional-bell nozzle. Despite the performance advantages that have been predicted, both analytically and through static test data, the dual-bell nozzle has still not been adequately tested in a relevant flight environment. In 2013 a proposal was constructed that offered a National Aeronautics and Space Administration (NASA) F-15 airplane as the flight testbed, with the plan to operate a dual-bell rocket nozzle during captive-carried flight. If implemented, this capability will permit nozzle operation into an external flow field similar to that of a launch vehicle, and facilitate an improved understanding of dual-bell nozzle plume sensitivity to external flow-field effects. More importantly, this flight testbed can be utilized to help quantify the performance benefit with the dual-bell nozzle, as well as to advance its technology readiness level. Toward this ultimate goal, this report provides plans for future flights to quantify the external flow field of the airplane near the nozzle experiment, as well as details on the conceptual design for the dual-bell nozzle cold-flow propellant feed system integration within the NASA F-15 Propulsion Flight Test Fixture. The current study shows that this concept of flight research is feasible, and could result in valuable flight data for the dual-bell nozzle.

  3. Development of the Situation Awareness Flight Training and Simulation Evaluation (SAFTE) System: II: Final Development, Initial Test, and Documentation of the System

    DTIC Science & Technology

    1999-08-01

    Parkway, Cambridge, MA 02138, (617) 876-8085) has ready-to-use DIS/ HLA interfaces for the PC ($3500.00). The other work required involves improving the...bomb the Target Designator Box. (SA MEASURE B27 : When the aircraft passes 1,300 MSL, ask: YOU MUST ABORT THE ATTACK IF YOU HAVE NOT RELEASED THE

  4. Breaking Through (SLS Gets Fired Up With Rock Legends STYX's "Gone Gone Gone")

    NASA Image and Video Library

    2017-10-19

    Inspired by the music of STYX, NASA's Space Launch System is fired up and getting ready for the deep-space rocket's first flight. "Gone Gone Gone" is the debut single from STYX's Mars-inspired album, "The Mission." SLS, the world’s most powerful rocket, will send NASA’s Orion crew vehicle on bold missions beyond Earth’s orbit farther than humans have ever ventured before.

  5. Saturn Apollo Program

    NASA Image and Video Library

    1964-12-01

    The fuel tank assembly of the Saturn V S-IC (first) stage is readied to be mated to the liquid oxygen tank at the Marshall Space Flight Center. The fuel tank carried kerosene as its fuel. The S-IC stage utilized five F-1 engines that used kerosene and liquid oxygen as propellant. Each engine provided 1,500,000 pounds of thrust. This stage lifted the entire vehicle and Apollo spacecraft from the launch pad.

  6. Design and Analysis of a Hyperspectral Microwave Receiver Subsystem

    NASA Technical Reports Server (NTRS)

    Blackwell, W.; Galbraith, C.; Hancock, T.; Leslie, R.; Osaretin, I.; Shields, M.; Racette, P.; Hillard, L.

    2012-01-01

    Hyperspectral microwave (HM) sounding has been proposed to achieve unprecedented performance. HM operation is achieved using multiple banks of RF spectrometers with large aggregate bandwidth. A principal challenge is Size/Weight/Power scaling. Objectives of this work: 1) Demonstrate ultra-compact (100 cm3) 52-channel IF processor (enabler); 2) Demonstrate a hyperspectral microwave receiver subsystem; and 3) Deliver a flight-ready system to validate HM sounding.

  7. Daniel Barry in Node 1/Unity module with tools

    NASA Image and Video Library

    2017-04-20

    S96-E-5080 (31 May 1999) --- Astronaut Daniel T. Barry, mission specialist, participates in the Flight Day 5 team effort to ready International Space Station (ISS) hardware. After ingressing the Pressurized Mating Adapter (PMA2), Barry and fellow crew members went into the Unity node to perform a variety of chores. The scene was recorded with an electronic still camera (ESC) at 01:54:41 GMT, May 31, 1999.

  8. View of LADEE's Gantry!

    NASA Image and Video Library

    2013-09-07

    This image shows an evening view gantry at Pad 0B at the Mid-Atlantic Regional Spaceport, at NASA's Wallops Flight Facility in Wallops Island, Va., on Sept. 4, 2013. In this photograph, the gantry surrounds the Minotaur V rocket that will launch NASA LADEE. The gantry is now removed and the Minotaur is getting ready to launch LADEE at 11:27 p.m. EDT tonight. Image credit: NASA Wallops/Patrick Black

  9. Revisiting Training and Verification Process Implementation for Risk Reduction on New Missions at NASA Jet Propulsion Laboratory

    NASA Technical Reports Server (NTRS)

    Bryant, Larry W.; Fragoso, Ruth S.

    2007-01-01

    In 2003 we proposed an effort to develop a core program of standardized training and verification practices and standards against which the implementation of these practices could be measured. The purpose was to provide another means of risk reduction for deep space missions to preclude the likelihood of a repeat of the tragedies of the 1998 Mars missions. We identified six areas where the application of standards and standardization would benefit the overall readiness process for flight projects at JPL. These are Individual Training, Team Training, Interface and Procedure Development, Personnel Certification, Interface and procedure Verification, and Operations Readiness Testing. In this paper we will discuss the progress that has been made in the tasks of developing the proposed infrastructure in each of these areas. Specifically we will address the Position Training and Certification Standards that are now available for each operational position found on our Flight Operations Teams (FOT). We will also discuss the MGSS Baseline Flight Operations Team Training Plan which can be tailored for each new flight project at JPL. As these tasks have been progressing, the climate and emphasis for Training and for V and V at JPL has changed, and we have learned about the expansion, growth, and limitations in the roles of traditional positions at JPL such as the Project's Training Engineer, V and V Engineer, and Operations Engineer. The need to keep a tight rein on budgets has led to a merging and/or reduction in these positions which pose challenges to individual capacities and capabilities. We examine the evolution of these processes and the roles involved while taking a look at the impact or potential impact of our proposed training related infrastructure tasks. As we conclude our examination of the changes taking place for new flight projects, we see that the importance of proceeding with our proposed tasks and adapting them to the changing climate remains an important element in reducing the risk in the challenging business of space exploration.

  10. Forward Technology Solar Cell Experiment (FTSCE) for MISSE-5 Verified and Readied for Flight on STS-114

    NASA Technical Reports Server (NTRS)

    Jenkins, Phillip P.; Krasowski, Michael J.; Greer, Lawrence C.; Flatico, Joseph M.

    2005-01-01

    The Forward Technology Solar Cell Experiment (FTSCE) is a space solar cell experiment built as part of the Fifth Materials on the International Space Station Experiment (MISSE-5): Data Acquisition and Control Hardware and Software. It represents a collaborative effort between the NASA Glenn Research Center, the Naval Research Laboratory, and the U.S. Naval Academy. The purpose of this experiment is to place current and future solar cell technologies on orbit where they will be characterized and validated. This is in response to recent on-orbit and ground test results that raised concerns about the in-space survivability of new solar cell technologies and about current ground test methodology. The various components of the FTSCE are assembled into a passive experiment container--a 2- by 2- by 4-in. folding metal container that will be attached by an astronaut to the outer structure of the International Space Station. Data collected by the FTSCE will be relayed to the ground through a transmitter assembled by the U.S. Naval Academy. Data-acquisition electronics and software were designed to be tolerant of the thermal and radiation effects expected on orbit. The experiment has been verified and readied for flight on STS-114.

  11. To redesignate the Dryden Flight Research Center as the Neil A. Armstrong Flight Research Center and the Western Aeronautical Test Range as the Hugh L. Dryden Aeronautical Test Range.

    THOMAS, 112th Congress

    Rep. McCarthy, Kevin [R-CA-22

    2012-11-29

    Senate - 01/01/2013 Received in the Senate and Read twice and referred to the Committee on Commerce, Science, and Transportation. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  12. ATV Engineering Support Team Safety Console Preparation for the Johannes Kepler Mission

    NASA Astrophysics Data System (ADS)

    Chase, R.; Oliefka, L.

    2010-09-01

    This paper describes the improvements to be implemented in the Safety console position of the Engineering Support Team(EST) at the Automated Transfer Vehicle(ATV) Control Centre(ATV-CC) for the upcoming ATV Johannes Kepler mission. The ATV missions to the International Space Station are monitored and controlled from the ATV-CC in Toulouse, France. The commanding of ATV is performed by the Vehicle Engineering Team(VET) in the main control room under authority of the Flight Director. The EST performs a monitoring function in a room beside the main control room. One of the EST positions is the Safety console, which is staffed by safety engineers from ESA and the industrial prime contractor, Astrium. The function of the Safety console is to check whether the hazard controls are available throughout the mission as required by the Hazard Reports approved by the ISS Safety Review Panel. Safety console preparation activities were limited prior to the first ATV mission due to schedule constraints, and the safety engineers involved have been working to improve the readiness for ATV 2. The following steps have been taken or are in process, and will be described in this paper: • review of the implementation of Operations Control Agreement Documents(OCADs) that record the way operational hazard controls are performed to meet the needs of the Hazard Reports(typically in Flight Rules and Crew Procedures), • crosscheck of operational control needs and implementations with respect to ATV's first flight observations and post flight evaluations, with a view to identifying additional, obsolete or revised operational hazard controls, • participation in the Flight Rule review and update process carried out between missions, • participation in the assessment of anomalies observed during the first ATV mission, to ensure that any impacts are addressed in the ATV 2 safety documentation, • preparation of a Safety console handbook to provide lists of important safety aspects to be monitored at various stages of the mission, including links to relevant Hazard Reports, Flight Rules, and supporting documentation, • participation to training courses conducted in the frame of the ATV Training Academy(ATAC), and provision of courses related to safety for the other members of the VET and EST, • participation to simulations conducted at ATV-CC, including off-nominal cases. The result of these activities will be an improved level of readiness for the ATV 2 mission.

  13. A B-52H, tail number 61-0025, arrives at NASA's Dryden Flight Research Center after landing July 30,

    NASA Technical Reports Server (NTRS)

    2001-01-01

    NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.

  14. A B-52H, on loan to NASA's Dryden Flight Research Center, makes a pass down the runway prior to land

    NASA Technical Reports Server (NTRS)

    2001-01-01

    NASA Dryden Flight Research Center, Edwards, California, received an 'H' model B-52 Stratofortress aircraft on July 30, 2001. The B-52H will be used as an air-launch aircraft supporting NASA's flight research and advanced technology demonstration efforts. Dryden received the B-52H from the U.S. Air Force's (USAF) 23rd Bomb Squadron, 5th Bombardment Wing (Air Combat Command), located at Minot AFB, N.D. A USAF crew flew the aircraft to Dryden. The aircraft, USAF tail number 61-0025, will be loaned initially, then later transferred from the USAF to NASA. The B-52H is scheduled to leave Dryden Aug. 2 for de-militarization and Programmed Depot Maintenance (PDM) at Tinker Air Force Base (AFB), Oklahoma. The depot-level maintenance is scheduled to last about six months and includes a thorough maintenance and inspection process. The newly arrived B-52H is slated to replace Dryden's famous B-52B '008,' in the 2003-2004 timeframe. It will take about one year for the B-52H to be ready for flight research duties. This time includes PDM, construction of the new pylon, installation of the flight research instrumentation equipment, and aircraft envelope clearance flights.

  15. 2011-2012 Dryden Center Innovation Fund End of the Year Report: Altitude-Compensating Rocket Nozzles

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Bui, Trong T.

    2012-01-01

    This report highlights one of the many successful projects at the NASA Dryden Flight Research Center that was approved for FY12 funding under the Center Innovation Fund. This project was focused on advancing the technology readiness level of one specific type of altitude-compensating nozzle: the dual-bell rocket nozzle. When considering a rocket's performance over its entire integrated trajectory, the dual-bell nozzle has been predicted to achieve a higher total impulse over the conventional bell nozzle, which is expected to result in a greater capability of payload mass to low-Earth orbit. Although the dual-bell rocket nozzle has been thoroughly studied for several decades, this nozzle has still not been adequately tested in a relevant flight-like environment. This report provides highlights and top-level details on the FY12 feasibility effort to advance this promising technology through flight test, a collaborative effort which leverages NASA Marshall's dual-bell nozzle research and development with Dryden's expertise in propulsion-focused flight testing. To accomplish this goal, the NASA F-15B is proposed as the testbed for the initial flight-test campaign to advance this greatly needed capability.

  16. Altitude-Compensating Nozzle (ACN) Project: Planning for Dual-Bell Rocket Nozzle Flight Testing on the NASA F-15B

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Bui, Trong T.; Ruf, Joseph H.

    2013-01-01

    For more than a half-century, several types of altitude-compensating nozzles have been proposed and analyzed, but very few have been adequately tested in a relevant flight environment. One type of altitude-compensating nozzle is the dual-bell rocket nozzle, which was first introduced into literature in 1949. Although the dual-bell rocket nozzle has been thoroughly studied, this nozzle has still not been tested in a relevant flight environment. This poster presents the top-level rationale and preliminary plans for conducting flight research with the dual-bell rocket nozzle, while exhausting the plume into the freestream flow field at various altitudes. The primary objective is to gain a greater understanding of the nozzle plume sensitivity to freestream flight effects, which will also include detailed measurements of the plume mode transition within the nozzle. To accomplish this goal, the NASA F-15B is proposed as the testbed for advancing the technology readiness level of this greatly-needed capability. All proposed tests include the quantitative performance analysis of the dual-bell rocket nozzle as compared with the conventional-bell nozzle.

  17. Experimentation for the Maturation of Deep Space Cryogenic Refueling Technologies

    NASA Technical Reports Server (NTRS)

    Chato, David J.

    2008-01-01

    This report describes the results of the "Experimentation for the Maturation of Deep Space Cryogenic Refueling Technology" study. This study identifies cryogenic fluid management technologies that require low-gravity flight experiments bring technology readiness levels to 5 to 6; examines many possible flight experiment options; and develops near-term low-cost flight experiment concepts to mature the core technologies. A total of 25 white papers were prepared by members of the project team in the course of this study. The full text of each white paper is included and 89 relevant references are cited. The team reviewed the white papers that provided information on new or active concepts of experiments to pursue and assessed them on the basis of technical need, cost, return on investment, and flight platform. Based on on this assessment the "Centaur Test Bed for Cryogenic Fluid Management" was rated the highest. "Computational Opportunities for Cryogenics for Cryogenic and Low-g Fluid Systems" was ranked second, based on its high scores in state of the art and return on investment, even though scores in cost and time were second to last. "Flight Development Test Objective Approach for In-space Propulsion Elements" was ranked third.

  18. Critical Readiness Review EHS Water Quality and Microbiology

    NASA Technical Reports Server (NTRS)

    Woo, Cindy

    2010-01-01

    Presentation reviews the status in reference to the Environmental, Health and Safety (EHS) of the water quality and microbiology for the International Space Station. It includes information about crew training, hardware delivery, and those items that will be returned for study.

  19. Advanced composite elevator for Boeing 727 aircraft

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Detail design activities are reported for a program to develop an advanced composites elevator for the Boeing 727 commercial transport. Design activities include discussion of the full scale ground test and flight test activities, the ancillary test programs, sustaining efforts, weight status, and the production status. Prior to flight testing of the advanced composites elevator, ground, flight flutter, and stability and control test plans were reviewed and approved by the FAA. Both the ground test and the flight test were conducted according to the approved plan, and were witnessed by the FAA. Three and one half shipsets have now been fabricated without any significant difficulty being encountered. Two elevator system shipsets were weighed, and results validated the 26% predicted weight reduction. The program is on schedule.

  20. HIFIRE Flight 2 Overview and Status Update 2011

    NASA Technical Reports Server (NTRS)

    Jackson, Kevin R.; Gruber, Mark R.; Buccellato, Salvatore

    2011-01-01

    A collaborative international effort, the Hypersonic International Flight Research Experimentation (HIFiRE) Program aims to study basic hypersonic phenomena through flight experimentation. HIFiRE Flight 2 teams the United States Air Force Research Lab (AFRL), NASA, and the Australian Defence Science and Technology Organisation (DSTO). Flight 2 will develop an alternative test technique for acquiring high enthalpy scramjet flight test data, allowing exploration of accelerating hydrocarbon-fueled scramjet performance and dual-to-scram mode transition up to and beyond Mach 8 flight. The generic scramjet flowpath is research quality and the test fuel is a simple surrogate for an endothermically cracked liquid hydrocarbon fuel. HIFiRE Flight 2 will be a first of its kind in contribution to scramjets. The HIFiRE program builds upon the HyShot and HYCAUSE programs and aims to leverage the low-cost flight test technique developed in those programs. It will explore suppressed trajectories of a sounding rocket propelled test article and their utility in studying ramjet-scramjet mode transition and flame extinction limits research. This paper describes the overall scramjet flight test experiment mission goals and objectives, flight test approach and strategy, ground test and analysis summary, development status and project schedule. A successful launch and operation will present to the scramjet community valuable flight test data in addition to a new tool, and vehicle, with which to explore high enthalpy scramjet technologies.

  1. STS-90 Day 01 Highlights

    NASA Technical Reports Server (NTRS)

    1998-01-01

    On this first day of the STS-90 mission, the flight crew, Cmdr. Richard A. Searfoss, Pilot Scott D. Altman, and Mission Specialists Richard M. Linnehan, Dafydd Rhys Williams and Kathryn P. Hire, and Payload Specialists Jay C. Buckey and James A. Pawelczyk, can be seen performing pre-launch activities such as eating the traditional breakfast, crew suit-up, and the ride out to the launch pad. Also, included are various panoramic views of the shuttle on the pad. The crew is readied in the white room' for their mission. After the closing of the hatch and arm retraction, launch activities are shown including countdown, engine ignition, launch, and the separation of the Solid Rocket Boosters. The shuttle's payload bay doors are then opened in anticipation of the 16-day scientific mission. The astronauts then are seen readying the Spacelab module for various experiments.

  2. The FUSE satellite is ready to move to the launch pad.

    NASA Technical Reports Server (NTRS)

    1999-01-01

    In Hangar AE, Cape Canaveral Air Station (CCAS), NASA's Far Ultraviolet Spectroscopic Explorer (FUSE) satellite stands ready to be moved to the launch pad. The black rectangle on top is the optical port; at the lower edge are the radiators. The total length of the instrument is approximately four meters. FUSE was developed by The Johns Hopkins University under contract to Goddard Space Flight Center, Greenbelt, Md., to investigate the origin and evolution of the lightest elements in the universe - hydrogen and deuterium. In addition, the FUSE satellite will examine the forces and process involved in the evolution of the galaxies, stars and planetary systems by investigating light in the far ultraviolet portion of the electromagnetic spectrum. Launch is targeted for June 23 from Launch Pad 17A, CCAS, aboard a Boeing Delta II rocket.

  3. [Behavioral risk factors and readiness in amateur marathon runners 18-64 years of age in Bogotá, Colombia, 2014].

    PubMed

    Ramírez-Góngora, María Del Pilar; Prieto-Alvarado, Franklyn Edwin

    2016-01-01

    Participation in amateur street marathons has become increasingly popular and requires prior individual health risk assessment. The objective was to identify risk factors and readiness in registered runners. This was a cross-sectional study in a random sample (n = 510) of registered amateur runners 18-64 years of age, using a digital survey with IPAQ, Par-Q+, and STEPwise, with an expected physical inactivity rate of 35% (±5%). The study explored physical activity, (binge) alcohol consumption, fruit, vegetable, and salt intake, smoking, and readiness. Self-reported rates were: 97.4% recommended level of physical activity, 2.4% optimal fruit and vegetable intake, 3.7% smoking, and 44.1% binge drinking. 19.8% were Par-Q+ positive and 5.7% practiced supervised exercise. The analysis showed differences by age, sex, and socioeconomic status. Recreational runners followed the recommended levels of physical activity but did not score well on other risk factors. Prior evaluation of lifestyle-related risk factors and readiness provides a safer athletic strategy.

  4. Stress Analysis and Testing at the Marshall Space Flight Center to Study Cause and Corrective Action of Space Shuttle External Tank Stringer Failures

    NASA Technical Reports Server (NTRS)

    Wingate, Robert J.

    2012-01-01

    After the launch scrub of Space Shuttle mission STS-133 on November 5, 2010, large cracks were discovered in two of the External Tank intertank stringers. The NASA Marshall Space Flight Center, as managing center for the External Tank Project, coordinated the ensuing failure investigation and repair activities with several organizations, including the manufacturer, Lockheed Martin. To support the investigation, the Marshall Space Flight Center formed an ad-hoc stress analysis team to complement the efforts of Lockheed Martin. The team undertook six major efforts to analyze or test the structural behavior of the stringers. Extensive finite element modeling was performed to characterize the local stresses in the stringers near the region of failure. Data from a full-scale tanking test and from several subcomponent static load tests were used to confirm the analytical conclusions. The analysis and test activities of the team are summarized. The root cause of the stringer failures and the flight readiness rationale for the repairs that were implemented are discussed.

  5. Getting expert systems off the ground: Lessons learned from integrating model-based diagnostics with prototype flight hardware

    NASA Technical Reports Server (NTRS)

    Stephan, Amy; Erikson, Carol A.

    1991-01-01

    As an initial attempt to introduce expert system technology into an onboard environment, a model based diagnostic system using the TRW MARPLE software tool was integrated with prototype flight hardware and its corresponding control software. Because this experiment was designed primarily to test the effectiveness of the model based reasoning technique used, the expert system ran on a separate hardware platform, and interactions between the control software and the model based diagnostics were limited. While this project met its objective of showing that model based reasoning can effectively isolate failures in flight hardware, it also identified the need for an integrated development path for expert system and control software for onboard applications. In developing expert systems that are ready for flight, artificial intelligence techniques must be evaluated to determine whether they offer a real advantage onboard, identify which diagnostic functions should be performed by the expert systems and which are better left to the procedural software, and work closely with both the hardware and the software developers from the beginning of a project to produce a well designed and thoroughly integrated application.

  6. Boeing's variable geometry chevron: morphing aerospace structures for jet noise reduction

    NASA Astrophysics Data System (ADS)

    Calkins, Frederick T.; Mabe, James H.; Butler, George W.

    2006-03-01

    Boeing is applying cutting edge smart material actuators to the next generation morphing technologies for aircraft. This effort has led to the Variable Geometry Chevrons (VGC), which utilize compact, light weight, and robust shape memory alloy (SMA) actuators. These actuators morph the shape of chevrons on the trailing edge of a jet engine in order to optimize acoustic and performance objectives at multiple flight conditions. We have demonstrated a technical readiness level of 7 by successfully flight testing the VGCs on a Boeing 777-300ER with GE-115B engines. In this paper we describe the VGC design, development and performance during flight test. Autonomous operation of the VGCs, which did not require a control system or aircraft power, was demonstrated. A parametric study was conducted showing the influence of VGC configurations on shockcell generated cabin noise reduction during cruise. The VGC system provided a robust test vehicle to explore chevron configurations for community and shockcell noise reduction. Most importantly, the VGC concept demonstrated an exciting capability to optimize jet nozzle performance at multiple flight conditions.

  7. A Study of Learning Curve Impact on Three Identical Small Spacecraft

    NASA Technical Reports Server (NTRS)

    Chen, Guangming; McLennan, Douglas D.

    2003-01-01

    With an eye to the future strategic needs of NASA, the New Millennium Program is funding the Space Technology 5 (ST-5) project to address the future needs in the area of small satellites in constellation missions. The ST-5 project, being developed at Goddard Space Flight Center, involves the development and simultaneous launch of three small, 20-kilogram-class spacecraft. ST-5 is only a test drive and future NASA science missions may call for fleets of spacecraft containing tens of smart and capable satellites in an intelligent constellation. The objective of ST-5 project is to develop three such pioneering small spacecraft for flight validation of several critical new technologies. The ST-5 project team at Goddard Space Flight Center has completed the spacecraft design, is now building and testing the three flight units. The launch readiness date (LRD) is in December 2005. A critical part of ST-5 mission is to prove that it is possible to build these small but capable spacecraft with recurring cost low enough to make future NASA s multi- spacecraft constellation missions viable from a cost standpoint.

  8. NASA's Kilopower Reactor Development and the Path to Higher Power Missions

    NASA Technical Reports Server (NTRS)

    Gibson, Marc A.; Oleson, Steven R.; Poston, David I.; McClure, Patrick

    2017-01-01

    The development of NASAs Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

  9. NASA's Kilopower Reactor Development and the Path to Higher Power Missions

    NASA Technical Reports Server (NTRS)

    Gibson, Marc A.; Oleson, Steven R.; Poston, Dave I.; McClure, Patrick

    2017-01-01

    The development of NASA's Kilopower fission reactor is taking large strides toward flight development with several successful tests completed during its technology demonstration trials. The Kilopower reactors are designed to provide 1-10 kW of electrical power to a spacecraft which could be used for additional science instruments as well as the ability to power electric propulsion systems. Power rich nuclear missions have been excluded from NASA proposals because of the lack of radioisotope fuel and the absence of a flight qualified fission system. NASA has partnered with the Department of Energy's National Nuclear Security Administration to develop the Kilopower reactor using existing facilities and infrastructure to determine if the design is ready for flight development. The 3-year Kilopower project started in 2015 with a challenging goal of building and testing a full-scale flight prototypic nuclear reactor by the end of 2017. As the date approaches, the engineering team shares information on the progress of the technology as well as the enabling capabilities it provides for science and human exploration.

  10. Iron status and its relations with oxidative damage and bone loss during long-duration space flight on the International Space Station.

    PubMed

    Zwart, Sara R; Morgan, Jennifer L L; Smith, Scott M

    2013-07-01

    Increases in stored iron and dietary intake of iron during space flight have raised concern about the risk of excess iron and oxidative damage, particularly in bone. The objectives of this study were to perform a comprehensive assessment of iron status in men and women before, during, and after long-duration space flight and to quantify the association of iron status with oxidative damage and bone loss. Fasting blood and 24-h urine samples were collected from 23 crew members before, during, and after missions lasting 50 to 247 d to the International Space Station. Serum ferritin and body iron increased early in flight, and transferrin and transferrin receptors decreased later, which indicated that early increases in body iron stores occurred through the mobilization of iron to storage tissues. Acute phase proteins indicated no evidence of an inflammatory response during flight. Serum ferritin was positively correlated with the oxidative damage markers 8-hydroxy-2'-deoxyguanosine (r = 0.53, P < 0.001) and prostaglandin F2α (r = 0.26, P < 0.001), and the greater the area under the curve for ferritin during flight, the greater the decrease in bone mineral density in the total hip (P = 0.031), trochanter (P = 0.006), hip neck (P = 0.044), and pelvis (P = 0.049) after flight. Increased iron stores may be a risk factor for oxidative damage and bone resorption.

  11. STS-112 M.S. Yurchikhin suits up for launch

    NASA Technical Reports Server (NTRS)

    2002-01-01

    KENNEDY SPACE CENTER, FLA. -- During suitup for launch, STS-112 Mission Specialist Fyodor Yurchikhin shows he is ready for his first Shuttle flight. STS-112 is the 15th assembly flight to the International Space Station, carrying the S1 Integrated Truss Structure, the first starboard truss segment, to be attached to the central truss segment, S0, and the Crew and Equipment Translation Aid (CETA) Cart A. The CETA is the first of two human-powered carts that will ride along the ISS railway, providing mobile work platforms for future spacewalking astronauts. On the 11-day mission, three spacewalks are planned to attach the S1 truss. Launch is scheduled for 3:46 p.m. EDT from Launch Pad 39B.

  12. ISIM Lowered into Thermal Vacuum Chamber

    NASA Image and Video Library

    2017-12-08

    An overhead glimpse inside the thermal vacuum chamber at NASA's Goddard Space Flight Center in Greenbelt, Md., as engineers ready the James Webb Space Telescope's Integrated Science Instrument Module, just lowered into the chamber for its first thermal vacuum test. The ISIM and the ISIM System Integration Fixture that holds the ISIM Electronics Compartment is completely covered in protective blankets to shield it from contamination. Image credit: NASA/Chris Gunn NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  13. Design and Analysis of Modules for Segmented X-Ray Optics

    NASA Technical Reports Server (NTRS)

    McClelland, Ryan S.; BIskach, Michael P.; Chan, Kai-Wing; Saha, Timo T; Zhang, William W.

    2012-01-01

    Future X-ray astronomy missions demand thin, light, and closely packed optics which lend themselves to segmentation of the annular mirrors and, in turn, a modular approach to the mirror design. The modular approach to X-ray Flight Mirror Assembly (FMA) design allows excellent scalability of the mirror technology to support a variety of mission sizes and science objectives. This paper describes FMA designs using slumped glass mirror segments for several X-ray astrophysics missions studied by NASA and explores the driving requirements and subsequent verification tests necessary to qualify a slumped glass mirror module for space-flight. A rigorous testing program is outlined allowing Technical Development Modules to reach technical readiness for mission implementation while reducing mission cost and schedule risk.

  14. KSC-05PD-0855

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. During Terminal Countdown Demonstration Test (TCDT) activities at NASAs Kennedy Space Center, STS-114 Mission Specialist Andrew Thomas is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.

  15. KSC-05PD-0854

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. During Terminal Countdown Demonstration Test (TCDT) activities at NASAs Kennedy Space Center, STS-114 Pilot James Kelly is ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.

  16. KSC-05PD-0846

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. During Terminal Countdown Demonstration Test (TCDT) activities at NASAs Kennedy Space Center, the STS-114 Mission Specialist Wendy Lawrence is getting ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.

  17. KSC-05PD-0848

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. During Terminal Countdown Demonstration Test (TCDT) activities at NASAs Kennedy Space Center, STS-114 Mission Specialist Stephen Robinson is getting ready to practice driving an M-113, an armored personnel carrier that is used for speedy departure from the launch pad in an emergency. The TCDT is held at KSC prior to each Space Shuttle flight. It provides the crew of each mission an opportunity to participate in simulated countdown activities. The test ends with a mock launch countdown culminating in a simulated main engine cutoff. The crew also spends time undergoing emergency egress training exercises at the launch pad. STS-114 is the first Return to Flight mission to the International Space Station. The launch window extends July 13 through July 31.

  18. KSC-2011-7852

    NASA Image and Video Library

    2011-11-16

    CAPE CANAVERAL, Fla. -- The Space Exploration Technologies Corp. (SpaceX) Dragon capsule is readied for lifting and placement to its cargo ring inside a processing hangar at Cape Canaveral Air Force Station in Florida on Nov. 16. Later, the combination will be attached to the top of a Falcon 9 rocket on Space Launch Complex-40 for the company's next demonstration test flight for NASA's Commercial Orbital Transportation Services (COTS) program. SpaceX is one of two companies under contract with NASA to take cargo to the International Space Station. NASA is working with SpaceX to combine its last two demonstration flights, and if approved, the Falcon 9 rocket would launch the Dragon capsule to the orbiting laboratory for a docking within the next several months. Photo credit: NASA/Kim Shiflett

  19. Enabling Electric Propulsion for Flight - Hybrid Electric Aircraft Research at AFRC

    NASA Technical Reports Server (NTRS)

    Clarke, Sean; Lin, Yohan; Kloesel, Kurt; Ginn, Starr

    2014-01-01

    Advances in electric machine efficiency and energy storage capability are enabling a new alternative to traditional propulsion systems for aircraft. This has already begun with several small concept and demonstration vehicles, and NASA projects this technology will be essential to meet energy and emissions goals for commercial aviation in the next 30 years. In order to raise the Technology Readiness Level of electric propulsion systems, practical integration and performance challenges will need to be identified and studied in the near-term so that larger, more advanced electric propulsion system testbeds can be designed and built. Researchers at NASA Armstrong Flight Research Center are building up a suite of test articles for the development, integration, and validation of these systems in a real world environment.

  20. Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to

    NASA Image and Video Library

    2017-07-26

    The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is packed inside a canister and ready to exit the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station for its move to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.

  1. KSC-98pc938

    NASA Image and Video Library

    1998-08-14

    This high-altitude research plane, a specially equipped Dryden Flight Research Center ER-2 (a modified U-2), is readied at Patrick Air Force Base for flight into a hurricane in the Atlantic. The plane is part of the NASA-led Atmospheric Dynamics and Remote Sensing program that includes other government weather researchers and the university community in a study of Atlantic hurricanes and tropical storms. The ER-2, soaring above 65,000 feet, will measure the structure of hurricanes and the surrounding atmosphere that steers the storms’ movement. The hurricane study, which lasts through September 1998, is part of NASA’s Earth Science enterprise to better understand the total Earth system and the effects of natural and human-induced changes on the global environment

  2. KSC-2009-2014

    NASA Image and Video Library

    2009-03-10

    CAPE CANAVERAL, Fla. – In the Operations and Checkout Building at NASA's Kennedy Space Center in Florida, STS-119 Mission Specialist Koichi Wakata has a final fitting of his launch and entry suit. Wakata will remain on the station, replacing Expedition 18 Flight Engineer Sandra Magnus, who returns to Earth with the STS-119 crew. The 14-day mission is the 28th to the International Space Station and the 125th space shuttle flight. Discovery will deliver the final pair of power-generating solar array wings and the S6 truss segment. Installation of S6 will signal the station's readiness to house a six-member crew for conducting increased science. Liftoff of Discovery is scheduled for 9:20 p.m. EDT on March 11. Photo credit: NASA/Kim Shiflett

  3. STS-26 Discovery, OV-103, OASIS equipment is mounted in payload bay (PLB)

    NASA Image and Video Library

    1988-04-18

    S88-37764 (18 April 1988) --- OASIS, instrumentation which will record the environment experienced by Discovery during the STS-26 Space Shuttle mission, is lowered into position for attachment to the orbiter's aft port sill. Instrumentation sensors in the payload bay which are connected to the tape recorder module will document a variety of environmental measurements during various phases of the flight including temperature, pressure, vibration, sounds, acceleration, stress, and strain. OASIS will also record data during the Flight Readiness Firing. NASA is flying OASIS aboard Discovery in support of the Inertial Upper Stage (IUS) program office of the Air Force Space Division. The system was developed by Lockheed under a NASA contract, funded by the Air Force.

  4. Veggie Processing

    NASA Image and Video Library

    2017-02-15

    Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.

  5. KSC-04pd0704

    NASA Image and Video Library

    2004-04-05

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians Mike Williams (left), Pearl Richardson (center) and R. Justin Hopmann get ready to lift the thermal blanket insulation into Discovery’s nose cap, which is under a protective cover and seated above on a work stand. The work is being done in a low bay area outside the Orbiter Processing Facility. Discovery is the orbiter named as the vehicle for Return to Flight with mission STS-114.

  6. Upgrade/Renovate Clinic Project at Ellsworth Air Force Base, South Dakota Generally Complied with the American Recovery and Reinvestment Act

    DTIC Science & Technology

    2011-01-06

    extended to the staff. Please direct questions to Mr. Michael Joseph at (757) 872-4698. Alice F. Carey Assistant Inspector General Readiness...optometry, dental , flight medicine, mental health, physical therapy, laboratory, pharmacy, and radiology. 3 Project Support Personnel at USACE...plan, dental equipment revisions, a corridor addition, replacement of all basement piping, and $3,374,672 of Operations and Maintenance funds

  7. The design, fabrication and installation of cable routing mockups in support of Spacelab 2

    NASA Technical Reports Server (NTRS)

    1981-01-01

    From flight and mockup drawings of Spacelab 2 (SL 2) experiments and hardware, shop ready mockup drawings were produced. Floor panels were the first items considered for fabrication. Cold plate and orthogrid mockups were designed and fabricated. Experiment and other hardware mockups were fabricated of aluminum or plywood, depending on size and configuration. Eighty-three cable routing bracket mockups were fabricated of aluminum and delivered for painting.

  8. Liftoff of first flight of Atlantis and the STS 51-J mission

    NASA Image and Video Library

    1985-10-03

    51J-S-003 (3 Oct 1985) --- This 35mm frame was taken moments after the Space Shuttle Atlantis cleared the launch tower to begin its first mission in space. Onboard, ready to carry out STS-51J mission were astronauts Karol J. Bobko, commander; Ronald J. Grabe, pilot; Robert L. Stewart and David C. Hilmers, mission specialist; and U.S.A.F. Major William A. Pailes, payload specialist.

  9. Liftoff of first flight of Atlantis and the STS 51-J mission

    NASA Image and Video Library

    1985-10-03

    51J-S-001 (3 Oct 1985) --- This 35mm frame was taken moments after the Space Shuttle Atlantis cleared the launch tower to begin its first mission in space. Onboard, ready to carry out STS-51J mission were astronauts Karol J. Bobko, commander; Ronald J. Grabe, pilot; Robert L. Stewart and David C. Hilmers, mission specialist; and United States Air Force Major William A. Pailes, payload specialist.

  10. Using CFD as Rocket Injector Design Tool: Recent Progress at Marshall Space Flight Center

    NASA Technical Reports Server (NTRS)

    Tucker, Kevin; West, Jeff; Williams, Robert; Lin, Jeff; Rocker, Marvin; Canabal, Francisco; Robles, Bryan; Garcia, Robert; Chenoweth, James

    2003-01-01

    The choice of tools used for injector design is in a transitional phase between exclusive reliance on the empirically based correlations and extensive use of computational fluid dynamics (CFD). The Next Generation Launch Technology (NGLT) Program goals emphasizing lower costs and increased reliability have produced a need to enable CFD as an injector design tool in a shorter time frame. This is the primary objective of the Staged Combustor Injector Technology Task currently under way at Marshall Space Flight Center (MSFC). The documentation of this effort begins with a very brief status of current injector design tools. MSFC's vision for use of CFD as a tool for combustion devices design is stated and discussed with emphasis on the injector. The concept of the Simulation Readiness Level (SRL), comprised of solution fidelity, robustness and accuracy, is introduced and discussed. This quantitative measurement is used to establish the gap between the current state of demonstrated capability and that necessary for regular use in the design process. MSFC's view of the validation process is presented and issues associated with obtaining the necessary data are noted and discussed. Three current experimental efforts aimed at generating validation data are presented. The importance of uncertainty analysis to understand the data quality is also demonstrated. First, a brief status of current injector design tools is provided as context for the current effort. Next, the MSFC vision for using CFD as an injector design tool is stated. A generic CFD-based injector design methodology is also outlined and briefly discussed. Three areas where MSFC is using injector CFD analyses for program support will be discussed. These include the Integrated Powerhead Development (IPD) engine which uses hydrogen and oxygen propellants in a full flow staged combustion (FFSC) cycle and the TR-107 and the RS84 engine both of which use RP-1 and oxygen in an ORSC cycle. Finally, an attempt is made to objectively summarize what progress has been made at MSFC in enabling CFD as an injector design tool.

  11. Frequency and prioritization of patient health risks from a structured health risk assessment.

    PubMed

    Phillips, Siobhan M; Glasgow, Russell E; Bello, Ghalib; Ory, Marcia G; Glenn, Beth A; Sheinfeld-Gorin, Sherri N; Sabo, Roy T; Heurtin-Roberts, Suzanne; Johnson, Sallie Beth; Krist, Alex H

    2014-01-01

    To describe the frequency and patient-reported readiness to change, desire to discuss, and perceived importance of 13 health risk factors in a diverse range of primary care practices. Patients (n = 1,707) in 9 primary care practices in the My Own Health Report (MOHR) trial reported general, behavioral, and psychosocial risk factors (body mass index [BMI], health status, diet, physical activity, sleep, drug use, stress, anxiety or worry, and depression). We classified responses as "at risk" or "healthy" for each factor, and patients indicated their readiness to change and/or desire to discuss identified risk factors with providers. Patients also selected 1 of the factors they were ready to change as most important. We then calculated frequencies within and across these factors and examined variation by patient characteristics and across practices. On average, patients had 5.8 (SD = 2.12; range, 0-13) unhealthy behaviors and mental health risk factors. About 55% of patients had more than 6 risk factors. On average, patients wanted to change 1.2 and discuss 0.7 risks. The most common risks were inadequate fruit/vegetable consumption (84.5%) and overweight/obesity (79.6%). Patients were most ready to change BMI (33.3%) and depression (30.7%), and most wanted to discuss depression (41.9%) and anxiety or worry (35.2%). Overall, patients rated health status as most important. Implementing routine comprehensive health risk assessments in primary care will likely identify a high number of behavioral and psychosocial health risks. By soliciting patient priorities, providers and patients can better manage counseling and behavior change. © 2014 Annals of Family Medicine, Inc.

  12. [Protocol for peripheral parenteral nutrition management ready to use in surgical patients].

    PubMed

    Pinzón Espitia, Olga Lucia; Varón Vega, Martha Liliana

    2014-10-03

    Patients undergoing elective surgery, require a comprehensive clinical treatment that tends to maintain or prevent deterioration of nutritional status and promote clinical outcomes, and in turn improve the safety of parenteral nutrition therapy through optimization of technology, as a option aimed at minimizing risk and lower operating costs in institutions providing health services. To review the literature in order to study the requirements and recommendations of peripheral parenteral nutritional support and / or complementary ready to use in people undergoing surgery. Data synthesis after reviewing the relevant literature, to allow the protocol design. The search was conducted in the following databases: PubMed, Medline, Embase and ScienceDirect. Peripheral parenteral nutrition is a ready to use alternative nutritional support that improves the contribution Protein-Energy and demonstrate improvements in patient safety, decrease costs and increase patient satisfaction. Copyright AULA MEDICA EDICIONES 2014. Published by AULA MEDICA. All rights reserved.

  13. Transrapid (the first high-speed Maglev train system certified ready for application): Development status and prospects for deployment

    NASA Technical Reports Server (NTRS)

    Luerken, Reinhard F.

    1994-01-01

    The Transrapid maglev technology is at the threshold of commercial deployment and technologically all prerequisites for the successful operation of the system in public service are given. In post unification Germany the domestic maglev technology is envisioned to be applied in the Berlin-Hamburg project. At present, a public-private funding concept is being prepared and the lengthy planning process is about to be initiated. In the USA the AMG has presented a program to Americanize the technology and to make it available for commercial use in the U.S. in the very near future. The paramount features of this program are to generate economic development, provide a basis for transportation technology development, create opportunities for U.S. industry, improve the U.S. transportation infrastructure, and improve the environment and traveler safety. Maglev is ready for the U.S.; is the U.S. ready for maglev?

  14. Oocyte membrane localization of vitellogenin receptor coincides with queen flying age, and receptor silencing by RNAi disrupts egg formation in fire ant virgin queens.

    PubMed

    Lu, Hsiao-Ling; Vinson, S B; Pietrantonio, Patricia V

    2009-06-01

    In ant species in which mating flights are a strategic life-history trait for dispersal and reproduction, maturation of virgin queens occurs. However, the specific molecular mechanisms that mark this transition and the effectors that control premating ovarian growth are unknown. The vitellogenin receptor (VgR) is responsible for vitellogenin uptake during egg formation in insects. In the red imported fire ant, Solenopsis invicta Buren (Hymenoptera: Formicidae), virgin queens have more abundant VgR transcripts than newly mated queens, but limited egg formation. To elucidate whether the transition to egg production involved changes in VgR expression, we investigated both virgin and mated queens. In both queens, western blot analysis showed an ovary-specific VgR band (approximately 202 kDa), and immunofluorescence analysis of ovaries detected differential VgR localization in early- and late-stage oocytes. However, the VgR signal was much lower in virgin queens ready to fly than in mated queens 8 h post mating flight. In virgin queens, the receptor signal was first observed at the oocyte membrane beginning at day 12 post emergence, coinciding with the 2 weeks of maturation required before a mating flight. Thus, the membrane localization of VgR appears to be a potential marker for queen mating readiness. Silencing of the receptor in virgin queens through RNA interference abolished egg formation, demonstrating that VgR is involved in fire ant ovary development pre mating. To our knowledge, this is the first report of RNA interference in any ant species and the first report of silencing of a hymenopteran VgR.

  15. Reduced-gravity environment hardware demonstrations of a prototype miniaturized flow cytometer and companion microfluidic mixing technology.

    PubMed

    Phipps, William S; Yin, Zhizhong; Bae, Candice; Sharpe, Julia Z; Bishara, Andrew M; Nelson, Emily S; Weaver, Aaron S; Brown, Daniel; McKay, Terri L; Griffin, DeVon; Chan, Eugene Y

    2014-11-13

    Until recently, astronaut blood samples were collected in-flight, transported to earth on the Space Shuttle, and analyzed in terrestrial laboratories. If humans are to travel beyond low Earth orbit, a transition towards space-ready, point-of-care (POC) testing is required. Such testing needs to be comprehensive, easy to perform in a reduced-gravity environment, and unaffected by the stresses of launch and spaceflight. Countless POC devices have been developed to mimic laboratory scale counterparts, but most have narrow applications and few have demonstrable use in an in-flight, reduced-gravity environment. In fact, demonstrations of biomedical diagnostics in reduced gravity are limited altogether, making component choice and certain logistical challenges difficult to approach when seeking to test new technology. To help fill the void, we are presenting a modular method for the construction and operation of a prototype blood diagnostic device and its associated parabolic flight test rig that meet the standards for flight-testing onboard a parabolic flight, reduced-gravity aircraft. The method first focuses on rig assembly for in-flight, reduced-gravity testing of a flow cytometer and a companion microfluidic mixing chip. Components are adaptable to other designs and some custom components, such as a microvolume sample loader and the micromixer may be of particular interest. The method then shifts focus to flight preparation, by offering guidelines and suggestions to prepare for a successful flight test with regard to user training, development of a standard operating procedure (SOP), and other issues. Finally, in-flight experimental procedures specific to our demonstrations are described.

  16. Reduced-gravity Environment Hardware Demonstrations of a Prototype Miniaturized Flow Cytometer and Companion Microfluidic Mixing Technology

    PubMed Central

    Bae, Candice; Sharpe, Julia Z.; Bishara, Andrew M.; Nelson, Emily S.; Weaver, Aaron S.; Brown, Daniel; McKay, Terri L.; Griffin, DeVon; Chan, Eugene Y.

    2014-01-01

    Until recently, astronaut blood samples were collected in-flight, transported to earth on the Space Shuttle, and analyzed in terrestrial laboratories. If humans are to travel beyond low Earth orbit, a transition towards space-ready, point-of-care (POC) testing is required. Such testing needs to be comprehensive, easy to perform in a reduced-gravity environment, and unaffected by the stresses of launch and spaceflight. Countless POC devices have been developed to mimic laboratory scale counterparts, but most have narrow applications and few have demonstrable use in an in-flight, reduced-gravity environment. In fact, demonstrations of biomedical diagnostics in reduced gravity are limited altogether, making component choice and certain logistical challenges difficult to approach when seeking to test new technology. To help fill the void, we are presenting a modular method for the construction and operation of a prototype blood diagnostic device and its associated parabolic flight test rig that meet the standards for flight-testing onboard a parabolic flight, reduced-gravity aircraft. The method first focuses on rig assembly for in-flight, reduced-gravity testing of a flow cytometer and a companion microfluidic mixing chip. Components are adaptable to other designs and some custom components, such as a microvolume sample loader and the micromixer may be of particular interest. The method then shifts focus to flight preparation, by offering guidelines and suggestions to prepare for a successful flight test with regard to user training, development of a standard operating procedure (SOP), and other issues. Finally, in-flight experimental procedures specific to our demonstrations are described. PMID:25490614

  17. Status of Sundstrand research

    NASA Technical Reports Server (NTRS)

    Bateman, Don

    1991-01-01

    Wind shear detection status is presented in the form of view-graphs. The following subject areas are covered: second generation detection (Q-bias, gamma bias, temperature biases, maneuvering flight modulation, and altitude modulation); third generation wind shear detection (use wind shear computation to augment flight path and terrain alerts, modulation of alert thresholds based on wind/terrain data base, incorporate wind shear/terrain alert enhancements from predictive sensor data); and future research and development.

  18. 14 CFR 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... shall include expenses incurred directly in the in-flight operation of aircraft and expenses attaching...-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing... aircraft or aircraft operational personnel for flight assignment. Such expenses shall be included in...

  19. Effects of space flights on human allergic status (IgE-mediated sensitivity)

    NASA Astrophysics Data System (ADS)

    Buravkova, L. B.; Rykova, M. P.; Gertsik, Y. G.; Antropova, E. N.

    2007-02-01

    Suppression of the immune system after space flights of different duration has been reported earlier by Konstantinova [Immune system in extreme conditions, Space immunology. B. 59. M. Science 1988. 289p. (in Russian) [4]; Immunoresistance of man in space flight, Acta Astronautica 23 (1991) 123-127 [5

  20. Demographic Correlates of Relationship Status among Black Americans.

    ERIC Educational Resources Information Center

    Tucker, M. Belinda; Taylor, Robert Joseph

    1989-01-01

    Analyzed National Survey of Black Americans data (N=2,107) to determine extent and structural correlates of marriage, romantic involvements, and preference for romantic involvement. Found marriage among Blacks dependent on male economic readiness and "traditionality"; fewer marital options for economically disadvantaged males, older…

Top