A field evaluation of data link flight information services for general aviation pilots
DOT National Transportation Integrated Search
1997-02-01
This report documents a field study of Data Link Flight Information Services : (FIS) designed for use by general aviation (GA) pilots. The Data Link FIS : package that was evaluated in this study included the Traffic Information : Service (TIS), Text...
Requirements for Flight Testing Automated Terminal Service
DOT National Transportation Integrated Search
1977-05-01
This report describes requirements for the flight tests of the baseline Automated Terminals Service (ATS) system. The overall objective of the flight test program is to evaluate the feasibility of the ATS concept. Within this objective there are two ...
The 737 graphite composite flight spoiler flight service evaluation
NASA Technical Reports Server (NTRS)
Stoecklin, R. L.
1977-01-01
The flight service experience of 110 graphite epoxy spoilers on 737 transport aircraft was reviewed as well as ground based environmental exposure of graphite epoxy material specimens for the period from April 1976 through April 1977. Several spoilers were installed on each of 27 aircraft representing seven major airlines operating throughout the world. A flight service evaluation program of at least 5 years is under way. As of April 30, 1977, a total of 766,938 spoiler flight hours and 1,168,090 spoiler landings were accumulated by the fleet. Based on visual ultrasonic, and destructive testing, there was no evidence of moisture migration into the honeycomb core and no core corrosion. Tests of removed spoilers and of ground based exposure specimens after the third year of service continue to indicate modest changes in composite strength properties.
The 737 graphite composite flight spoiler flight service evaluation
NASA Technical Reports Server (NTRS)
Stoecklin, R. L.
1975-01-01
The flight service experience of 108 graphite-epoxy spoilers on 737 transport aircraft, and related ground-based environmental exposure of graphite-epoxy material specimens were evaluated. Four spoilers were installed on each of 27 aircraft for a 5-year study. As of February 28, 1975, a total of 294,280 spoiler flight-hours and 460,686 spoiler landings were accumulated. Based on visual, ultrasonic, and destructive testing, no moisture migration into the honeycomb core and no core corrosion has occurred. Tests of removed spoilers and of ground-based exposure specimens after the first year of service indicate no significant changes in composite strength.
NASA Technical Reports Server (NTRS)
Zinberg, H.
1984-01-01
The flight service components for the Bell Model 206L JetRanger helicopter are examined. The components were placed in service in the Continental United States, Canada, and Alaska. The status of 34 sets of components is discussed. Approximately 27,500 flight hours were accumulated on the components as of 1 August 1983. Three sets of components and one-fifth of the exposure coupons were returned and tested. The results are given. The overall behavior of the components and associated problems are discussed.
Long-term environmental effects and flight service evaluation of composite materials
NASA Technical Reports Server (NTRS)
Dexter, H. Benson
1987-01-01
Results of a NASA-Langley sponsored research program to establish the long term effects of realistic flight environments and ground based exposure on advanced composite materials are presented. The effects of moisture, ultraviolet radiation, aircraft fuels and fluids, sustained stress, and fatigue loading are reported. Residual strength and stiffness as a function of exposure time and exposure location are reported for seven different material systems after 10 years of worldwide outdoor exposure. Flight service results of over 300 composite components installed on rotorcraft and transport aircraft are included. Over 4 million total component flight hours were accumulated on various aircraft since initiation of flight service in 1973. Service performance, maintenance characteristics, and residual strength of numerous composite components installed on commercial and military aircraft are reported as a function of flight hours and years in service. Residual strength test results of graphite/epoxy spoilers with 10 years of worldwide service and over 28,000 flight hours are reported.
Casto, Kristen L; Cho, Timothy H
2012-09-01
This case report describes the in-flight speech intelligibility evaluation of an aircraft crewmember with pure tone audiometric thresholds that exceed the U.S. Army's flight standards. Results of in-flight speech intelligibility testing highlight the inability to predict functional auditory abilities from pure tone audiometry and underscore the importance of conducting validated functional hearing evaluations to determine aviation fitness-for-duty.
Flight service evaluation of composite components on Bell 206L and Sikorsky S-76 helicopters
NASA Technical Reports Server (NTRS)
Baker, D. J.
1983-01-01
Progress on two programs to evaluate composite structural components in flight service on commercial helicopters is described. Thirty-six ship sets of composite components that include the litter door, baggage door, forward fairing, and vertical fin were installed on Bell Model 206L helicopters that are operating in widely different climatic areas. Four horizontal stabilizers and ten tail rotor spars that are production components on the S-76 helicopter were tested after prescribed periods of service to determine the effects of the operating environment on their performance. Concurrent with the flight evaluation, specimens from materials used to fabricate the components were exposed in ground racks and tested at specified intervals to determine the effects of outdoor environments. Results achieved from 14,000 hours of accumulated service on the 206L components, tests on a S-76 horizontal stabilizer after 1600 hours of service, tests on a S-76 tail rotor spar after 2300 hours service, and two years of ground based exposure of material coupons are reported.
Composite components on commercial aircraft
NASA Technical Reports Server (NTRS)
Dexter, H. B.
1980-01-01
Commercial aircraft manufacturers are making production commitments to composite structure for future aircraft and modifications to current production aircraft. Flight service programs with advanced composites sponsored by NASA during the past 10 years are described. Approximately 2.5 million total composite component flight hours have been accumulated since 1970 on both commercial transports and helicopters. Design concepts with significant mass savings were developed, appropriate inspection and maintenance procedures were established, and satisfactory service was achieved for the various composite components. A major NASA/U.S. industry technology program to reduce fuel consumption of commercial transport aircraft through the use of advanced composites was undertaken. Ground and flight environmental effects on the composite materials used in the flight service programs supplement the flight service evaluation.
The 737 graphite composite flight spoiler flight service evaluation
NASA Technical Reports Server (NTRS)
Coggeshall, R. L.
1982-01-01
A flight service report was prepared which covers the flight service experience of 111 graphite epoxy spoilers on 737 transport aircraft and related ground based environmental exposure of graphite epoxy material specimens. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Tests of removed spoilers after the seventh year of service continue to indicate modest changes in composite strength properties. Two spoilers were tested, one with 6 and one with 7 years of service, and both had residual strengths that fall within the original static strength scatter band. Both these units had typical service included discrepancies when tested. Based on visual, ultrasonic, and destructive inspection there continues to be no evidence of moisture migration into the honeycomb core and no core corrosion in the deployed units.
DOT National Transportation Integrated Search
1991-04-01
This study evaluates the content validity of the Initial Qualifications Course provided to flight service specialists (FSS) by the FAA Academy. The purpose of FSS Initial Qualifications Course (FAA Academy course 50232) is to predict the student's pr...
The 737 graphite composite flight spoiler flight service evaluation
NASA Technical Reports Server (NTRS)
Stoecklin, R. L.
1976-01-01
The flight-service experience of 110 graphite-epoxy spoilers on 737 transport aircraft and related ground-based environmental exposure of graphite-epoxy material specimens is reported. Spoilers were installed on each of 27 aircraft representing seven major airlines operating throughout the world. Based on visual, ultrasonic, and destructive testing, there is no evidence of moisture migration into the honeycomb core and no core corrosion. Tests of removed spoilers and of ground-based exposure specimens after the second year of service indicate modest changes in composite strength.
Flight service evaluation of composite helicopter components
NASA Technical Reports Server (NTRS)
Mardoian, George H.; Ezzo, Maureen B.
1994-01-01
This paper presents the results of a NASA funded contract and Sikorsky research and development programs to evaluate structural composite components in flight service on Sikorsky Model S-76 helicopters. Selected components were removed and tested at prescribed intervals over a nine year time frame. Four horizontal stabilizers and thirteen tail rotor spars were returned from commercial service in West Palm Beach, Florida and in the Gulf Coast region of Louisiana to determine the long term effects of operations in hot and humid climates on component performance. Concurrent with the flight component evaluation, panels of materials used in their fabrication were exposed to the environment in ground racks. Selected panels were tested annually to determine the effects of exposure on physical and mechanical properties. The results of 55,741 component flight hours and 911 months of field exposure are reported and compared with initial Federal Aviation Administration (FAA) certification data. The findings of this program have provided increased confidence in the long term durability of advanced composite materials used in helicopter structural applications.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1977-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after three years' service, and found to be performing satisfactorily. There are six Kevlar-49 panels on each aircraft, including sandwich and solid laminate wing-body panels, and 150 C service aft engine fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.
Flight service evaluation of two aluminum-brazed titanium spoilers
NASA Technical Reports Server (NTRS)
Boyer, R. R.
1984-01-01
The long-term service evaluation of two aluminum-brazed titanium (ABTi) honeycomb flight spoilers was concluded. The two spoilers had about 7.5 years of commercial flight experience on All Nippon Airways Model 737 aircraft. All Nippon Airways was selected because Japan has one of the most severe marine-industrial environments in the world. The results indicated that both flight spoilers still had the same load-carrying capability as when they were originally installed. No direct evidence of any corrosion was observed on either spoiler. Another significant accomplishment of this effort was the development of a braze design for efficiently distributing point loads from the fittings and skin into the honeycomb core.
Engineering flight and guest pilot evaluation report, phase 2. [DC 8 aircraft
NASA Technical Reports Server (NTRS)
Morrison, J. A.; Anderson, E. B.; Brown, G. W.; Schwind, G. K.
1974-01-01
Prior to the flight evaluation, the two-segment profile capabilities of the DC-8-61 were evaluated and flight procedures were developed in a flight simulator at the UA Flight Training Center in Denver, Colorado. The flight evaluation reported was conducted to determine the validity of the simulation results, further develop the procedures and use of the area navigation system in the terminal area, certify the system for line operation, and obtain evaluations of the system and procedures by a number of pilots from the industry. The full area navigation capabilities of the special equipment installed were developed to provide terminal area guidance for two-segment approaches. The objectives of this evaluation were: (1) perform an engineering flight evaluation sufficient to certify the two-segment system for the six-month in-service evaluation; (2) evaluate the suitability of a modified RNAV system for flying two-segment approaches; and (3) provide evaluation of the two-segment approach by management and line pilots.
A Communication Skills Training Course for Trans World Airlines Flight Service Managers.
ERIC Educational Resources Information Center
Hurst, Katherine
A project analyzed, designed, developed, implemented, and evaluated a training program that would enable Trans World Airlines flight service managers to develop effective communication skills. The instructional systems design process was used throughout. The analysis identified the need for communication training for the target population. Program…
The 737 graphite composite flight spoiler flight service evaluation
NASA Technical Reports Server (NTRS)
Hoffman, D. J.; Stoecklin, R. L.
1980-01-01
The flight service experience of 111 graphite-epoxy spoilers on 737 transport aircraft and related ground based enviromental exposure of graphite-epoxy material specimens is reported. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Over 1,188,367 spoiler flight hours and 1,786,837 spoiler landings were accumulated by this fleet. Tests of removed spoilers and ground-based exposure specimens after the fifth year of service indicate modest changes in composite strength properties. Two incidents of trailing edge delamination with subsequent core corrosion were observed. Based on visual, ultrasonic, and destructive testing, there has been no evidence of moisture migration into the honeycomb core and no core corrosion.
NASA Technical Reports Server (NTRS)
Wooley, J. H.
1974-01-01
Fairing panels were fabricated to evaluate the fabrication characteristics and flight service performance of PRD-49 (Kevlar-49) a composite reinforcing material and to compare it with the fiberglass which is currently in use. Panel configurations were selected to evaluate the PRD-49 with two resin matrix materials in sandwich and solid laminate construction. Left and right hand versions of these configurations were installed on L-1011's which will accumulate approximately 3000 flight hours per year per aircraft. The direct substitution of PRD-49 for fiberglass produced a twenty-six percent weight reduction on the panel configurations. Examination of these panels revealed that there was no visible difference between the PRD-49 and adjacent fiberglass panels.
Fabrication and evaluation of brazed titanium-clad borsic/aluminum skin-stringer panels
NASA Technical Reports Server (NTRS)
Bales, T. T.; Royster, D. M.; Mcwithey, R. R.
1980-01-01
A successful brazing process was developed and evaluated for fabricating full-scale titanium-clad Borsic/aluminum skin-stringer panels. A panel design was developed consisting of a hybrid composite skin reinforced with capped honeycomb-core stringers. Six panels were fabricated for inclusion in the program which included laboratory testing of panels at ambient temperatures and 533 K (500 F) and flight service evaluation on the NASA Mach 3 YF-12 airplane. All panels tested met or exceeded stringent design requirements and no deleterious effects on panel properties were detected followng flight service evaluation on the YF-12 airplane.
Operational flight evaluation of the two-segment approach for use in airline service
NASA Technical Reports Server (NTRS)
Schwind, G. K.; Morrison, J. A.; Nylen, W. E.; Anderson, E. B.
1975-01-01
United Airlines has developed and evaluated a two-segment noise abatement approach procedure for use on Boeing 727 aircraft in air carrier service. In a flight simulator, the two-segment approach was studied in detail and a profile and procedures were developed. Equipment adaptable to contemporary avionics and navigation systems was designed and manufactured by Collins Radio Company and was installed and evaluated in B-727-200 aircraft. The equipment, profile, and procedures were evaluated out of revenue service by pilots representing government agencies, airlines, airframe manufacturers, and professional pilot associations. A system was then placed into scheduled airline service for six months during which 555 two-segment approaches were flown at three airports by 55 airline pilots. The system was determined to be safe, easy to fly, and compatible with the airline operational environment.
Collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation
NASA Astrophysics Data System (ADS)
Yang, Shangwen; Guo, Baohua; Xiao, Xuefei; Gao, Haichao
2018-01-01
To allocate the en-routes and slots to the flights with collaborative decision making, a collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation was proposed. Evaluation indexes include flight delay costs, delay time and the number of turning points. Analytic hierarchy process is applied to determining index weights. Remark set for current two flights not yet obtained the en-route and slot in flight schedule is established. Then, fuzzy comprehensive evaluation is performed, and the en-route and slot for the current two flights are determined. Continue selecting the flight not yet obtained an en-route and a slot in flight schedule. Perform fuzzy comprehensive evaluation until all flights have obtained the en-routes and slots. MatlabR2007b was applied to numerical test based on the simulated data of a civil en-route. Test results show that, compared with the traditional strategy of first come first service, the algorithm gains better effect. The effectiveness of the algorithm was verified.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1980-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 6 years' service. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.
Flight evaluation of two-segment approaches using area navigation guidance equipment
NASA Technical Reports Server (NTRS)
Schwind, G. K.; Morrison, J. A.; Nylen, W. E.; Anderson, E. B.
1976-01-01
A two-segment noise abatement approach procedure for use on DC-8-61 aircraft in air carrier service was developed and evaluated. The approach profile and procedures were developed in a flight simulator. Full guidance is provided throughout the approach by a Collins Radio Company three-dimensional area navigation (RNAV) system which was modified to provide the two-segment approach capabilities. Modifications to the basic RNAV software included safety protection logic considered necessary for an operationally acceptable two-segment system. With an aircraft out of revenue service, the system was refined and extensively flight tested, and the profile and procedures were evaluated by representatives of the airlines, airframe manufacturers, the Air Line Pilots Association, and the Federal Aviation Adminstration. The system was determined to be safe and operationally acceptable. It was then placed into scheduled airline service for an evaluation during which 180 approaches were flown by 48 airline pilots. The approach was determined to be compatible with the airline operational environment, although operation of the RNAV system in the existing terminal area air traffic control environment was difficult.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1982-01-01
Kevlar-49 fairing panels, installed as flight service components on three l-1011's, were inspected after 8 years service. The fairings had accumulated a total of 62,000 hours, with one ship set having 20,850 hours service. Kevlar-49 components were found to be performing satisfactorily in service with no major problems. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structures.
Flight Avionics Sequencing Telemetry (FAST) DIV Latching Display
NASA Technical Reports Server (NTRS)
Moore, Charlotte
2010-01-01
The NASA Engineering (NE) Directorate at Kennedy Space Center provides engineering services to major programs such as: Space Shuttle, Inter national Space Station, and the Launch Services Program (LSP). The Av ionics Division within NE, provides avionics and flight control syste ms engineering support to LSP. The Launch Services Program is respons ible for procuring safe and reliable services for transporting critical, one of a kind, NASA payloads into orbit. As a result, engineers mu st monitor critical flight events during countdown and launch to asse ss anomalous behavior or any unexpected occurrence. The goal of this project is to take a tailored Systems Engineering approach to design, develop, and test Iris telemetry displays. The Flight Avionics Sequen cing Telemetry Delta-IV (FAST-D4) displays will provide NASA with an improved flight event monitoring tool to evaluate launch vehicle heal th and performance during system-level ground testing and flight. Flight events monitored will include data from the Redundant Inertial Fli ght Control Assembly (RIFCA) flight computer and launch vehicle comma nd feedback data. When a flight event occurs, the flight event is ill uminated on the display. This will enable NASA Engineers to monitor c ritical flight events on the day of launch. Completion of this project requires rudimentary knowledge of launch vehicle Guidance, Navigatio n, and Control (GN&C) systems, telemetry, and console operation. Work locations for the project include the engineering office, NASA telem etry laboratory, and Delta launch sites.
NASA Technical Reports Server (NTRS)
Kafka, P. G.; Skibo, M. A.; White, J. L.
1977-01-01
The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.
An epidemiological study of reproductive health in female civil aviation employees.
Yang, Yue; Zhang, Weiyuan; Chan, Ada; Li, Chunling; He, Xiaoyan; Cui, Lei; Lv, Yuren; Liu, Juan; Guo, Xiuhua
2013-06-01
To investigate the correlations between occupational risk factors and reproductive health and to provide targeted healthcare services to female civil aviation employees based on surveys about menstrual and reproductive health status. Subjects were selected from flight attendants working for China Southern Airlines, Air China, and other airlines; employees of China Aviation Oil Limited, China TravelSky, and China Aviation Supplies Holding Company; and airport ground service crews. Data were collected using anonymous questionnaires. A total of 1175 valid questionnaires were recovered. The subjects were categorized into a flight attendant group and a ground service group, which contained 563 and 612 women, respectively. The prevalence of irregular menstruation, including abnormal cycles, severe dysmenorrhea, and hypomenorrhea or menorrhagia, was significantly higher in the flight attendant group (30.55%) than in the ground service group (13.40%); in concordance, the fertility rate was significantly lower in the flight attendant group (36.59%) than in the ground service group (43.95%). The spontaneous abortion rate in the flight attendant group (6.80%) was significantly higher than in the ground service group (2.97%). The rate of life-threatening abortions, preterm births, and low birth weight was significantly lower in the flight attendant group than in the ground service group. The impact of occupational risk factors on the reproductive health of female aviation workers should be evaluated and examined more thoroughly. Additional healthcare services such as routine menstruation healthcare and policies for workers planning to have a pregnancy are beneficial in monitoring reproductive health, reducing harmful exposures during early pregnancy, and preventing incapacitating gynecologic events.
DOT National Transportation Integrated Search
1994-04-01
This document describes the first of three studies relating to human factors : aspects in the flight desk display of Automatic Terminal Information Servies : (ATIS). This research is being conducted by the Federal Aviation Administration : (FAA) Tech...
14 CFR 1215.108 - Defining user service requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... evaluate the trade-offs available among various TDRSS services, spacecraft design, operations planning, and... Flight Center, M/S 450.1, 8800 Greenbelt Road Greenbelt, MD 20771. [77 FR 6953, Feb. 10, 2012] ...
NASA Technical Reports Server (NTRS)
Stone, R. H.
1981-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 7 years service. There are six Kevlar-49 panels on each aircraft: a left hand and right hand set of a wing-body sandwich fairing; a slid laminate under-wing fillet panel; and a 422 K service aft engine fairing. The three L-1011s include one each in service with Eastern, Air Canada, and TWA. The fairings have accumulated a total of 52,500 hours, with one ship set having 17.700 hours service. The inspections were conducted at the airlines' major maintenance bases with the participation of Lockheed Engineering. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems or any condition requiring corrective action. The only defects noted were minor impact damage and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.
Audiometric profile of civilian pilots according to noise exposure
Falcão, Taiana Pacheco; Luiz, Ronir Raggio; Schütz, Gabriel Eduardo; Mello, Márcia Gomide da Silva; Câmara, Volney de Magalhães
2014-01-01
OBJECTIVE To evaluate the audiometric profile of civilian pilots according to the noise exposure level. METHODS This observational cross-sectional study evaluated 3,130 male civilian pilots aged between 17 and 59 years. These pilots were subjected to audiometric examinations for obtaining or revalidating the functional capacity certificate in 2011. The degree of hearing loss was classified as normal, suspected noise-induced hearing loss, and no suspected hearing loss with other associated complications. Pure-tone air-conduction audiometry was performed using supra-aural headphones and acoustic stimulus of the pure-tone type, containing tone thresholds of frequencies between 250 Hz and 6,000 Hz. The independent variables were professional categories, length of service, hours of flight, and right or left ear. The dependent variable was pilots with suspected noise-induced hearing loss. The noise exposure level was considered low/medium or high, and the latter involved periods > 5,000 flight hours and > 10 years of flight service. RESULTS A total of 29.3% pilots had suspected noise-induced hearing loss, which was bilateral in 12.8% and predominant in the left ear (23.7%). The number of pilots with suspected hearing loss increased as the noise exposure level increased. CONCLUSIONS Hearing loss in civilian pilots may be associated with noise exposure during the period of service and hours of flight. PMID:25372170
Food Service and Nutrition for the Space Station
NASA Technical Reports Server (NTRS)
Sauer, R. L. (Editor)
1985-01-01
The proceedings of the Workshop on Food Service and Nutrition for the Space Station, held in Houston, Texas, on April 10 and 11, 1984 was given. The workshop was attended by experts in food technology from industry, government, and academia. Following a general definition of unique space flight requirements, oral presentations were made on state of the art food technology with the objective of using this technology to support the space flight requirements. Numerous areas are identified which in the opinion of the conferees, would have space flight application. But additional effort, evaluation, or testing to include Shuttle inflight testing will be required for the technology to be applied to the Space Station.
Flight evaluation of two segment approaches for jet transport noise abatement
NASA Technical Reports Server (NTRS)
Rogers, R. A.; Wohl, B.; Gale, C. M.
1973-01-01
A 75 flight-hour operational evaluation was conducted with a representative four-engine fan-jet transport in a representative airport environment. The flight instrument systems were modified to automatically provide pilots with smooth and continuous pitch steering command information during two-segment approaches. Considering adverse weather, minimum ceiling and flight crew experience criteria, a transition initiation altitude of approximately 800 feet AFL would have broadest acceptance for initiating two-segment approach procedures in scheduled service. The profile defined by the system gave an upper glidepath of approximately 6 1/2 degrees. This was 1/2 degree greater than inserted into the area navigation system. The glidepath error is apparently due to an erroneous along-track, distance-to-altitude profile.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1979-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after five years' service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 150 C (300 F) service aft engine fairing. The fairings have accumulated a total of 40,534 hours, with one ship set having 16,091 hours service as of Feb. 11, 1979. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.
NASA Technical Reports Server (NTRS)
Davis, Richard E.; Maddalon, Dal V.; Wagner, Richard D.; Fisher, David F.; Young, Ronald
1989-01-01
Summary evaluations of the performance of laminar-flow control (LFC) leading edge test articles on a NASA JetStar aircraft are presented. Statistics, presented for the test articles' performance in haze and cloud situations, as well as in clear air, show a significant effect of cloud particle concentrations on the extent of laminar flow. The cloud particle environment was monitored by two instruments, a cloud particle spectrometer (Knollenberg probe) and a charging patch. Both instruments are evaluated as diagnostic aids for avoiding laminar-flow detrimental particle concentrations in future LFC aircraft operations. The data base covers 19 flights in the simulated airline service phase of the NASA Leading-Edge Flight-Test (LEFT) Program.
Durability of aircraft composite materials
NASA Technical Reports Server (NTRS)
Dextern, H. B.
1982-01-01
Confidence in the long term durability of advanced composites is developed through a series of flight service programs. Service experience is obtained by installing secondary and primary composite components on commercial and military transport aircraft and helicopters. Included are spoilers, rudders, elevators, ailerons, fairings and wing boxes on transport aircraft and doors, fairings, tail rotors, vertical fins, and horizontal stabilizers on helicopters. Materials included in the evaluation are boron/epoxy, Kevlar/epoxy, graphite/epoxy and boron/aluminum. Inspection, maintenance, and repair results for the components in service are reported. The effects of long term exposure to laboratory, flight, and outdoor environmental conditions are reported for various composite materials. Included are effects of moisture absorption, ultraviolet radiation, and aircraft fuels and fluids.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1983-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 9 years of service. There are six Kevlar-49 panels on each aircraft: a left hand and right hand set of a wing body sandwich fairing; a solid laminate under wing fillet panel; and a 422 K (300 F) service aft engine fairing. The fairings have accumulated a total of 70,000 hours, with one ship set having over 24,000 hours service. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.
Service evaluation of aircraft composite structural components
NASA Technical Reports Server (NTRS)
Brooks, W. A., Jr.; Dow, M. B.
1973-01-01
The advantages of the use of composite materials in structural applications have been identified in numerous engineering studies. Technology development programs are underway to correct known deficiencies and to provide needed improvements. However, in the final analysis, flight service programs are necessary to develop broader acceptance of, and confidence in, any new class of materials such as composites. Such flight programs, initiated by NASA Langley Research Center, are reviewed. These programs which include the selectively reinforced metal and the all-composite concepts applied to both secondary and primary aircraft structural components, are described and current status is indicated.
The space station assembly phase: Flight telerobotic servicer feasibility, volume 1
NASA Technical Reports Server (NTRS)
Smith, Jeffrey H.; Gyamfi, Max A.; Volkmer, Kent; Zimmerman, Wayne F.
1987-01-01
The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.
Evaluation of Composite Components on the Bell 206L and Sikorsky S-76 Helicopters
NASA Technical Reports Server (NTRS)
Baker, Donald J.
1990-01-01
Progress on two programs to evaluate structural composite parts in flight service on Bell 206L and Sikorsky S-76 commercial helicopters is described. Forty ship sets of composite parts that include the litter door, baggage door, forward fairing, and vertical fin were installed on Bell Model 206L helicopters that are operating in widely different climates. Part installation started in 1981 and selected parts are being removed and tested at prescribed intervals over a 10 yr evaluation. Four horizontal stabilizers and eleven tail rotor spars that are production parts on the S-76 helicopter are being tested after prescribed periods of service to determine the effects of the operating environment on their performance. Concurrent with the flight evaluation, materials used to fabricate the parts are being exposed in ground racks and tested at specified intervals to determine the effects of outdoor environments. Results achieved from 123,000 hrs of accumulated service on the Bell 206L parts and 53,000 hrs on the Sikorsky S-76 parts are reported. Seventy-eight Bell 206L parts were removed and tested statically. Results of 7 yrs of ground exposure of materials used to make the Bell 206L parts are presented.
Bridging the Gap: Extending the Life of Marine Corps F/A-18 Hornets
2011-04-28
Flight Support Team Fatigue Usage Index Full Up System Level High Flight Hours Initial Operational Capability Initial Operational Test and Evaluation...SLMP SRA STOVL TAT TMS T&R TRAP VMFAT WRA Naval Aviation Enterprise Naval Air Systems Command Naval Inventory Control Point Operational ...suggestions for reducing this burden Ia Washingl!ln Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis
NASA Technical Reports Server (NTRS)
Stone, R. H.
1975-01-01
Kevlar-49 fairing panels were inspected and found to be performing satisfactorily after two years flight service on an Eastern and an Air Canada L-1011. Six panels are on each aircraft including sandwich and solid laminate wing-body panels, and 300 F service aft engine fairings. Some of the panels were removed from the aircraft to permit inspection of inner surfaces and fastener hole conditions. Minor defects such as surface cracks due to impact damage, small delaminated areas, elongation and fraying of fastener holes, were noted. None of these defects were considered serious enough to warrant corrective action in the opinion of airline personnel. The defects are typical for the most part of defects noted on similar fiberglass parts.
14 CFR 121.550 - Secret Service Agents: Admission to flight deck.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...
14 CFR 121.550 - Secret Service Agents: Admission to flight deck.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...
14 CFR 121.550 - Secret Service Agents: Admission to flight deck.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...
14 CFR 121.550 - Secret Service Agents: Admission to flight deck.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...
14 CFR 121.550 - Secret Service Agents: Admission to flight deck.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...
Environmental effects on composites for aircraft
NASA Technical Reports Server (NTRS)
Pride, R. A.
1978-01-01
A number of ongoing, long-term environmental effects programs for composite materials are evaluated. The flight service experience was evaluated for 142 composite aircraft components after more than 5 years and 1 million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at 5 sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation was observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.
A criterion for establishing life limits. [for Space Shuttle Main Engine service
NASA Technical Reports Server (NTRS)
Skopp, G. H.; Porter, A. A.
1990-01-01
The development of a rigorous statistical method that would utilize hardware-demonstrated reliability to evaluate hardware capability and provide ground rules for safe flight margin is discussed. A statistical-based method using the Weibull/Weibayes cumulative distribution function is described. Its advantages and inadequacies are pointed out. Another, more advanced procedure, Single Flight Reliability (SFR), determines a life limit which ensures that the reliability of any single flight is never less than a stipulated value at a stipulated confidence level. Application of the SFR method is illustrated.
NASA Technical Reports Server (NTRS)
Sallee, G. P.; Martin, R. L.
1980-01-01
The JT9D jet engine exhibits a TSFC loss of about 1 percent in the initial 50 flight cycles of a new engine. These early losses are caused by seal-wear induced opening of running clearances in the engine gas path. The causes of this seal wear have been identified as flight induced loads which deflect the engine cases and rotors, causing the rotating blades to rub against the seal surfaces, producing permanent clearance changes. The real level of flight loads encountered during airplane acceptance testing and revenue service and the engine's response in the dynamic flight environment were investigated. The feasibility of direct measurement of these flight loads and their effects by concurrent measurement of 747/JT9D propulsion system aerodynamic and inertia loads and the critical engine clearance and performance changes during 747 flight and ground operations was evaluated. A number of technical options were examined in relation to the total estimated program cost to facilitate selection of the most cost effective option. It is concluded that a flight test program meeting the overall objective of determining the levels of aerodynamic and inertia load levels to which the engine is exposed during the initial flight acceptance test and normal flight maneuvers is feasible and desirable. A specific recommended flight test program, based on the evaluation of cost effectiveness, is defined.
NASA Technical Reports Server (NTRS)
Zinberg, H.
1982-01-01
The design, fabrication, and testing phases of a program to obtain long term flight service experience on representative helicopter airframe structural components operating in typical commercial environments are described. The aircraft chosen is the Bell Helicopter Model 206L. The structural components are the forward fairing, litter door, baggage door, and vertical fin. The advanced composite components were designed to replace the production parts in the field and were certified by the FAA to be operable through the full flight envelope of the 206L. A description of the fabrication process that was used for each of the components is given. Static failing load tests on all components were done. In addition fatigue tests were run on four specimens that simulated the attachment of the vertical fin to the helicopter's tail boom.
TDRSS Onboard Navigation System (TONS) flight qualification experiment
NASA Technical Reports Server (NTRS)
Gramling, C. J.; Hart, R. C.; Folta, D. C.; Long, A. C.
1994-01-01
The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.
Electrical Subsystems Flight Test Handbook
1984-01-01
distribution of this handbook to the public at large, or by DDC to the National Technical Information Service (NTIS). At NTIS, it will be available to...Abnormal Mode 58 Emergency Mode 61 Instrumentation 62 Test Information Sheets 62 Integration with Flight Test Program 62 DATA MEASUREMENT, ANALYS IS...AND EVALUATION 65 REFERENCES 73 -APPENDIX A - EXAMPLE OF TEST INFORMATION SHEET 75 APPENDIX B - EXAMPLE OF TEST PLAN SAFETY REVIEW 85 APPENDIX C
EMS helicopter incidents reported to the NASA Aviation Safety Reporting System
NASA Technical Reports Server (NTRS)
Connell, Linda J.; Reynard, William D.
1993-01-01
The objectives of this evaluation were to: Identify the types of safety-related incidents reported to the Aviation Safety Reporting System (ASRS) in Emergency Medical Service (EMS) helicopter operations; Describe the operational conditions surrounding these incidents, such as weather, airspace, flight phase, time of day; and Assess the contribution to these incidents of selected human factors considerations, such as communication, distraction, time pressure, workload, and flight/duty impact.
Astronaut James Newman during in-space evaluation of portable foot restraint
1993-09-16
STS051-98-010 (16 Sept 1993) --- Astronaut James H. Newman, mission specialist, conducts an in-space evaluation of the Portable Foot Restraint (PFR) which will be used operationally on the first Hubble Space Telescope (HST) STS-61 servicing mission and future Shuttle missions. Astronauts Newman and Carl E. Walz spent part of their lengthy extravehicular activity (EVA) evaluating gear to be used on the STS-61 HST servicing mission. The frame was exposed with a 70mm handheld Hasselblad camera from the Space Shuttle Discovery's flight deck.
NASA Astrophysics Data System (ADS)
Romli, F. I.; Rahman, K. Abdul; Ishak, F. D.
2016-10-01
Increased competition in the commercial air transportation industry has made service quality of the airlines as one of the key competitive measures to attract passengers against their rivals. In-flight services, particularly food delivery and waste collection, have a notable impact on perception of the overall airline's service quality because they are directly and interactively provided to passengers during flight. An online public survey is conducted to explore general passengers' perception of current in-flight food delivery and waste collection services, and to identify potential rooms for improvement. The obtained survey results indicate that in-flight service does have an effect on passengers' choice of airlines. Several weaknesses of the current service method and possible improvements have been established from the collected responses.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... Standards Service Aviation Safety Inspectors; Correction AGENCY: Federal Aviation Administration (FAA), DOT... ``Restrictions on Operators Employing Former Flight Standards Service Aviation Safety Inspectors'' (76 FR 52231... of, a Flight Standards Service Aviation Safety Inspector, and had direct responsibility to inspect...
14 CFR 1214.804 - Services, pricing basis, and other considerations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...
14 CFR 1214.804 - Services, pricing basis, and other considerations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...
14 CFR 1214.804 - Services, pricing basis, and other considerations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...
14 CFR 1214.804 - Services, pricing basis, and other considerations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...
Flight-service program for advanced composite rudders on transport aircraft
NASA Technical Reports Server (NTRS)
1979-01-01
Flight service experience and in-service inspection results are reported for DC-10 graphite composite rudders during the third year of airline service. Test results and status are also reported for ground-based and airborne graphite-epoxy specimens with three different epoxy resin systems to obtain moisture absorption data. Twenty graphite composite rudders were produced, nine of which were installed on commercial aircraft during the past three years. The rudders collectively accumulated 75,863 flight hours. The high time rudder accumulated 12,740 flight hours in slightly over 36 months. The graphite composite rudders were inspected visually at approximately 1000 flight hour intervals and ultrasonically at approximately 3000 flight hour intervals in accordance with in-service inspection plans. All rudders were judged acceptable for continued service as a result of these inspections. Composite moisture absorption data on small specimens, both ground-based and carried aboard three flight-service aircraft, are given. The specimens include Thornel 300 fibers in Narmco 5208 and 5209 resin systems, and Type AS fibers in the Hercules 3501-6 resin system.
NASA Technical Reports Server (NTRS)
Schramm, Harry F.; Sullivan, Kenneth W.
1991-01-01
An evaluation of the NASA's Marshall Space Flight Center (MSFC) strategy to implement Total Quality Management (TQM) in the Advanced Solid Rocket Motor (ASRM) Project is presented. The evaluation of the implementation strategy reflected the Civil Service personnel perspective at the project level. The external and internal environments at MSFC were analyzed for their effects on the ASRM TQM strategy. Organizational forms, cultures, management systems, problem solving techniques, and training were assessed for their influence on the implementation strategy. The influence of ASRM's effort was assessed relative to its impact on mature projects as well as future projects at MSFC.
14 CFR 375.50 - Transit flights; scheduled international air service operations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...
14 CFR 375.50 - Transit flights; scheduled international air service operations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...
14 CFR 375.50 - Transit flights; scheduled international air service operations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...
14 CFR 375.50 - Transit flights; scheduled international air service operations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...
14 CFR 375.50 - Transit flights; scheduled international air service operations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...
14 CFR § 1214.804 - Services, pricing basis, and other considerations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... ADMINISTRATION SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...
NASA Technical Reports Server (NTRS)
Feher, K.; Bollinger, L.; Bowles, J. V.; Waters, M. H.
1978-01-01
An evaluation of the current status and future requirements of an intraregional short haul air service is given. A brief definition of the different types of short haul air service is given. This is followed by a historical review of previous attempts to develop short haul air service in high density urban areas and an assessment of the current status. The requirements for intraregional air service, the need for economic and environmental viability and the need for a flight research program are defined. A detailed outline of a research program that would determine urban community reaction to frequent operations of small transport aircraft is also given. Both the operation of such an experiment in a specific region (San Francisco Bay area) and the necessary design modifications of an existing fixed wing aircraft which could be used in the experiment are established. An estimate is made of overall program costs.
NASA Technical Reports Server (NTRS)
Whalen, Edward A.
2016-01-01
This document serves as the final report for the Flight Services and Aircraft Access task order NNL14AA57T as part of NASA Environmentally Responsible Aviation (ERA) Project ITD12A+. It includes descriptions of flight test preparations and execution for the Active Flow Control (AFC) Vertical Tail and Insect Accretion and Mitigation (IAM) experiments conducted on the 757 ecoDemonstrator. For the AFC Vertical Tail, this is the culmination of efforts under two task orders. The task order was managed by Boeing Research & Technology and executed by an enterprise-wide Boeing team that included Boeing Research & Technology, Boeing Commercial Airplanes, Boeing Defense and Space and Boeing Test and Evaluation. Boeing BR&T in St. Louis was responsible for overall Boeing project management and coordination with NASA. The 757 flight test asset was provided and managed by the BCA ecoDemonstrator Program, in partnership with Stifel Aircraft Leasing and the TUI Group. With this report, all of the required deliverables related to management of this task order have been met and delivered to NASA as summarized in Table 1. In addition, this task order is part of a broader collaboration between NASA and Boeing.
NASA Technical Reports Server (NTRS)
Stone, R. H.
1984-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 10 years of service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 422 K (300 F) service aft engine fairing. The three L-1011s include one each in service with Eastern, Air Canada, and TWA. The fairings have accumulated a total of 79,568 hours, with one ship set having nearly 28,000 hours service. The inspections were conducted at the airlines' major maintenance bases with the participation of Lockheed Engineering. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history obtained in this program indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.
In-Service Evaluation of the Dalmo Victor Active Beacon Collision Avoidance System (BCAS/TCAS).
1982-10-01
expected to make any substantial change to this report on operational performance. Collectively, this report and the additional technical per- fomance...deviation from the recorded flight path, while 10 others might have required some change in flight path, depending on the vertical rate of the TCAS...They are based on data collected with no response by the TCAS aircraft crew and will change when the crew initiates response action to resolution
2011-02-16
ISS026-E-027391 (16 Feb. 2011) --- Russian cosmonaut Dmitry Kondratyev, Expedition 26 flight engineer, wearing a Russian Orlan-MK spacesuit, participates in a session of extravehicular activity (EVA) focused on the installation of two scientific experiments outside the Zvezda Service Module of the International Space Station. During the four-hour, 51-minute spacewalk, Kondratyev and Russian cosmonaut Oleg Skripochka (out of frame), flight engineer, installed a pair of earthquake and lightning sensing experiments and retrieved a pair of spacecraft material evaluation panels.
2011-02-16
ISS026-E-027361 (16 Feb. 2011) --- Russian cosmonaut Dmitry Kondratyev, Expedition 26 flight engineer, wearing a Russian Orlan-MK spacesuit, participates in a session of extravehicular activity (EVA) focused on the installation of two scientific experiments outside the Zvezda Service Module of the International Space Station. During the four-hour, 51-minute spacewalk, Kondratyev and Russian cosmonaut Oleg Skripochka (out of frame), flight engineer, installed a pair of earthquake and lightning sensing experiments and retrieved a pair of spacecraft material evaluation panels.
2011-02-16
ISS026-E-027368 (16 Feb. 2011) --- Russian cosmonaut Dmitry Kondratyev, Expedition 26 flight engineer, wearing a Russian Orlan-MK spacesuit, participates in a session of extravehicular activity (EVA) focused on the installation of two scientific experiments outside the Zvezda Service Module of the International Space Station. During the four-hour, 51-minute spacewalk, Kondratyev and Russian cosmonaut Oleg Skripochka (out of frame), flight engineer, installed a pair of earthquake and lightning sensing experiments and retrieved a pair of spacecraft material evaluation panels.
Medical emergencies at a major international airport: in-flight symptoms and ground-based follow-up.
Chan, Shu B; Hogan, Teresita M; Silva, Julio C
2002-10-01
There is limited recent data about the treatments and outcomes of commercial airline passengers who suffer in-flight medical symptoms resulting in subsequent EMS evaluation. The study objectives are to determine incidence, post-flight treatments, outcomes, morbidity, and mortality of these in-flight medical emergencies (IFMEs). A 1-yr retrospective study of emergency medical service (EMS), emergency department (ED), and inpatient hospital records of IFME patients from Chicago O'Hare International Airport was completed. All commercial passengers or crew with in-flight medical symptoms who subsequently activated the EMS system on flight arrival are included in the study. The main outcome measures are: in-flight sudden deaths, post-flight mortality, hospital admission rate, ICU admission rate, ED procedures, inpatient procedures, and discharge diagnoses. There were 744 IFMEs for an incidence of 21.3 per million passengers per year. The hospital admission rate was 24.5%. The ICU admission rate was 5.9%. There were five in-flight sudden deaths and six in-hospital deaths for an overall mortality rate of 0.3 per million passengers per year. Emergency stabilization procedures were required on 4.8% of patients. Cardiac emergencies accounted for 29.1% of inpatient diagnoses and 13.1% of all discharge diagnoses. The incidence of in-flight medical emergencies is small but these IFMEs are potentially lethal. Although the majority of IFME patients have uneventful outcomes, there is associated morbidity and mortality. These included in-flight deaths, in-hospital deaths, and emergency procedures. Cardiac emergencies were the most common of serious EMS evaluated in-flight medical emergencies.
2007-06-23
The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, June 22, 2007. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.
48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... Law 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...
48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...
48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...
48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...
48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...
Safety Versus Passenger Service: The Flight Attendants’ Dilemma
Damos, Diane L.; Boyett, Kimberly S.; Gibbs, Patt
2013-01-01
After 9/11, new security duties were instituted at many U.S. air carriers and existing safety and security duties received increased emphasis. Concurrently, in-flight services were changed and in many cases, cabin crews were reduced. This article examines the post-9/11 conflict between passenger service and the timely performance of safety and security duties at 1 major U.S. air carrier. In-flight data were obtained on both international and domestic flights. The data suggest that the prompt performance of the safety and security duties is adversely affected by the number of service duties occurring in the later part of both international and domestic flights. PMID:23667300
47 CFR 87.307 - Cooperative use of facilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SERVICES AVIATION SERVICES Flight Test Stations § 87.307 Cooperative use of facilities. (a) The Commission will license only one flight test land station per airport, except as provided in paragraph (d) of this section. (b) Flight test land stations located at an airport are required to provide service without...
NASA Technical Reports Server (NTRS)
Stone, R. H.
1978-01-01
Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after four years' service, and found to be performing satisfactorily. The Kevlar-49 components were all found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. A concurrent investigation was conducted on Kevlar-49/epoxy coupons exposed to an outdoor environment over a three year period at various locations providing a variety of climatic conditions. Weight changes and retention of mechanical properties were determined after one and three years exposure. A net weight loss occurred due to ultraviolet effects on the unpainted specimens. Mechanical property retentions were satisfactory with most specimens retaining well over 80% of their original value.
2007-06-25
Lit by sunlight filtered through the smoke of a distant forest fire, the Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.
NASA Technical Reports Server (NTRS)
Harvill, W. E.; Kays, A. O.; Young, E. C.; Mcgee, W. M.
1972-01-01
Areas where selective reinforcement of conventional metallic structure can improve static strength/fatigue endurance at lower weight than would be possible if metal reinforcement were used are discussed. These advantages are now being demonstrated by design, fabrication, and tests of three boron-epoxy reinforced C-130E center wing boxes. This structural component was previously redesigned using an aluminum build-up to meet increased severity of fatigue loadings. Direct comparisons of relative structural weights, manufacturing costs, and producibility can therefore be obtained, and the long-time flight service performance of the composite reinforced structure can be evaluated against the wide background of metal reinforced structure.
NASA Technical Reports Server (NTRS)
Phillips, Veronica J.
2017-01-01
The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.
Damage Tolerance Assessment Branch
NASA Technical Reports Server (NTRS)
Walker, James L.
2013-01-01
The Damage Tolerance Assessment Branch evaluates the ability of a structure to perform reliably throughout its service life in the presence of a defect, crack, or other form of damage. Such assessment is fundamental to the use of structural materials and requires an integral blend of materials engineering, fracture testing and analysis, and nondestructive evaluation. The vision of the Branch is to increase the safety of manned space flight by improving the fracture control and the associated nondestructive evaluation processes through development and application of standards, guidelines, advanced test and analytical methods. The Branch also strives to assist and solve non-aerospace related NDE and damage tolerance problems, providing consultation, prototyping and inspection services.
NASA Technical Reports Server (NTRS)
Holloway, G. F.
1975-01-01
An unmanned test flight program required to evaluate the command module heat shield and the structural integrity of the command and service module/Saturn launch vehicle is described. The mission control programer was developed to provide the unmanned interface between the guidance and navigation computer and the other spacecraft systems for mission event sequencing and real-time ground control during missions AS-202, Apollo 4, and Apollo 6. The development of this unmanned programer is traced from the initial concept through the flight test phase. Detailed discussions of hardware development problems are given with the resulting solutions. The mission control programer functioned correctly without any flight anomalies for all missions. The Apollo 4 mission control programer was reused for the Apollo 6 flight, thus being one of the first subsystems to be reflown on an Apollo space flight.
14 CFR § 1214.205 - Revisit and/or retrieval services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... accomplished on a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... services will be priced on the basis of estimated costs. If a special dedicated Shuttle flight is required...
14 CFR 398.7 - Timing of flights.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Timing of flights. 398.7 Section 398.7... STATEMENTS GUIDELINES FOR INDIVIDUAL DETERMINATIONS OF BASIC ESSENTIAL AIR SERVICE § 398.7 Timing of flights. To qualify as essential air service, flights must depart at reasonable times, considering the needs...
14 CFR 398.7 - Timing of flights.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Timing of flights. 398.7 Section 398.7... STATEMENTS GUIDELINES FOR INDIVIDUAL DETERMINATIONS OF BASIC ESSENTIAL AIR SERVICE § 398.7 Timing of flights. To qualify as essential air service, flights must depart at reasonable times, considering the needs...
Advanced aircraft service life monitoring method via flight-by-flight load spectra
NASA Astrophysics Data System (ADS)
Lee, Hongchul
This research is an effort to understand current method and to propose an advanced method for Damage Tolerance Analysis (DTA) for the purpose of monitoring the aircraft service life. As one of tasks in the DTA, the current indirect Individual Aircraft Tracking (IAT) method for the F-16C/D Block 32 does not properly represent changes in flight usage severity affecting structural fatigue life. Therefore, an advanced aircraft service life monitoring method based on flight-by-flight load spectra is proposed and recommended for IAT program to track consumed fatigue life as an alternative to the current method which is based on the crack severity index (CSI) value. Damage Tolerance is one of aircraft design philosophies to ensure that aging aircrafts satisfy structural reliability in terms of fatigue failures throughout their service periods. IAT program, one of the most important tasks of DTA, is able to track potential structural crack growth at critical areas in the major airframe structural components of individual aircraft. The F-16C/D aircraft is equipped with a flight data recorder to monitor flight usage and provide the data to support structural load analysis. However, limited memory of flight data recorder allows user to monitor individual aircraft fatigue usage in terms of only the vertical inertia (NzW) data for calculating Crack Severity Index (CSI) value which defines the relative maneuver severity. Current IAT method for the F-16C/D Block 32 based on CSI value calculated from NzW is shown to be not accurate enough to monitor individual aircraft fatigue usage due to several problems. The proposed advanced aircraft service life monitoring method based on flight-by-flight load spectra is recommended as an improved method for the F-16C/D Block 32 aircraft. Flight-by-flight load spectra was generated from downloaded Crash Survival Flight Data Recorder (CSFDR) data by calculating loads for each time hack in selected flight data utilizing loads equations. From the comparison of interpolated fatigue life using CSI value and fatigue test results, it is obvious that proposed advanced IAT method via flight-by-flight load spectra is more reliable and accurate than current IAT method. Therefore, the advanced aircraft service life monitoring method based on flight-by-flight load spectra not only monitors the individual aircraft consumed fatigue life for inspection but also ensures the structural reliability of aging aircrafts throughout their service periods.
NASA Astrophysics Data System (ADS)
LeBuhn, G.; Schmucki, R.
2016-12-01
Identifying the spatial patterns of pollinator visitation rates is key to identifying the drivers of differences in pollination service and the areas where pollinator conservation will provide the highest return on investment. However, gathering pollinator abundance data at the appropriate regional and national scales is untenable. As a surrogate, habitat models have been developed to identify areas of pollinator losses but these models have been developed using expert opinion based on foraging and nesting requirements. Thousands of citizen scientists across the United States participating in The Great Sunflower Project (www.GreatSunflower.org) contribute timed counts of pollinator visits to a focal sunflower variety planted in local gardens and green spaces. While these data provide a more direct measure of pollination service to a standardized plant and include a measure of effort, the data are complicated. Each location is sampled at different dates, times and frequencies as well as different points across the local flight season. To overcome this complication, we have used a generalized additive model to generate regional flight curves to calibrate each individual data point and to attain better estimates of pollination service at each site. Using these flight season corrected data, we identify hotspots and cold spots in pollinator service across the United States, evaluate the drivers shaping the spatial patterns and observe how these data align with the results obtained from predictive models that are based on expert knowledge on foraging and nesting habitats.
Apollo experience report: Engineering and analysis mission support
NASA Technical Reports Server (NTRS)
Fricke, R. W., Jr.
1975-01-01
The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.
NASA Technical Reports Server (NTRS)
Jackson, Dionne
2005-01-01
The NASA Materials Science Laboratory (MSL) provides science and engineering services to NASA and Contractor customers at KSC, including those working for the Space Shuttle. International Space Station. and Launch Services Programs. These services include: (1) Independent/unbiased failure analysis (2) Support to Accident/Mishap Investigation Boards (3) Materials testing and evaluation (4) Materials and Processes (M&P) engineering consultation (5) Metrology (6) Chemical analysis (including ID of unknown materials) (7) Mechanical design and fabrication We provide unique solutions to unusual and urgent problems associated with aerospace flight hardware, ground support equipment and related facilities.
47 CFR 87.299 - Scope of service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Scope of service. 87.299 Section 87.299 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Flight Test Stations § 87.299 Scope of service. The use of flight test stations is restricted to the...
The use of consumer-satisfaction surveys by an air medical program.
Hanzely, D; Higgins, B; Popil, V
1993-07-01
Surveys were distributed to referring and receiving hospitals or to EMS agencies that used the air medical service. The respondents were asked to evaluate the dispatcher's, pilot's and flight crew's professionalism and courteousness on a Likert scale and through written comments. Phase 1 of the survey distribution was discontinued after problems were encountered due to the distribution process. Phase 2 consisted of the air medical program mailing surveys directly to the referring and receiving facilities or to the EMS agencies. In terms of courteousness and professionalism, 90% of the respondents' answers fell within the strongly agree to neutral range. Questions regarding pilots and dispatchers were often left unanswered. Two areas were identified as needing further work on the part of the medical flight crew: follow-up with referring hospitals on patient outcome and identification of flight physicians vs. flight nurses.
14 CFR 1214.119 - Spacelab payloads.
Code of Federal Regulations, 2010 CFR
2010-01-01
...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...
14 CFR 1214.119 - Spacelab payloads.
Code of Federal Regulations, 2012 CFR
2012-01-01
...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...
14 CFR 1214.119 - Spacelab payloads.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...
14 CFR 1214.119 - Spacelab payloads.
Code of Federal Regulations, 2011 CFR
2011-01-01
...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding...
Evaluation of composite components on the Bell 206L and Sikorsky S-76 helicopters
NASA Technical Reports Server (NTRS)
Baker, Donald J.
1990-01-01
Progress on two programs to evaluate structural composite components in flight service on Bell 206L and Sikorsky S-76 commercial helicopters is described. Forty ship sets of composite components that include the litter door, baggage door, forward fairing, and vertical fin have been installed on Bell Model 206L helicopters that are operating in widely different climates. Component installation started in 1981 and selected components were removed and tested at prescribed intervals over a ten year evaluation. Four horizontal stabilizers and eleven tail rotor spars that are production components on the S-76 helicopter were tested after prescribed periods of service to determine the effects of the operating environment on their performance. Concurrent with the flight evaluation, materials used to fabricate the components were exposed in ground racks and tested at specified intervals to determine the effects of outdoor environments. Results achieved from 123,000 hours of accumulated service on the Bell 206L components and 53,000 hours on the Sikorsky S-76 components are reported. Seventy-eight Bell 206L components were removed and tested statically. Results of seven years of ground exposure of materials used to fabricate the Bell 206L components are presented. Results of tests on four Sikorsky S-76 horizontal stabilizers and eleven tail rotor spars are also presented. Panels of material used to fabricate the Sikorsky S-76 components that were exposed for six years were tested and results are presented.
14 CFR 1214.115 - Standard services.
Code of Federal Regulations, 2011 CFR
2011-01-01
...: commander, pilot and three mission specialists. (e) Orbiter flight planning services. (f) One day of... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.115 Standard...
14 CFR § 1214.119 - Spacelab payloads.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data...§ 1214.119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...
1969-02-20
S69-19798 (February 1969) --- Composite of three artist's concepts illustrating key events, tasks and activities on the tenth day of the Apollo 9 mission, including Command Module and Service Modules separation, re-entry, and Atlantic splashdown. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1975-01-01
Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.
NASA Technical Reports Server (NTRS)
Harvill, W. E.; Duhig, J. J.; Spencer, B. R.
1973-01-01
The design, fabrication, and evaluation of boron-epoxy reinforced C-130 center wing boxes are discussed. Design drawings, static strength, fatigue endurance, flutter, and weight analyses required for the wing box fabrication are presented. Additional component testing to verify the design for panel buckling and to evaluate specific local design areas are reported.
Analysis and Preliminary Design of an Advanced Technology Transport Flight Control System
NASA Technical Reports Server (NTRS)
Frazzini, R.; Vaughn, D.
1975-01-01
The analysis and preliminary design of an advanced technology transport aircraft flight control system using avionics and flight control concepts appropriate to the 1980-1985 time period are discussed. Specifically, the techniques and requirements of the flight control system were established, a number of candidate configurations were defined, and an evaluation of these configurations was performed to establish a recommended approach. Candidate configurations based on redundant integration of various sensor types, computational methods, servo actuator arrangements and data-transfer techniques were defined to the functional module and piece-part level. Life-cycle costs, for the flight control configurations, as determined in an operational environment model for 200 aircraft over a 15-year service life, were the basis of the optimum configuration selection tradeoff. The recommended system concept is a quad digital computer configuration utilizing a small microprocessor for input/output control, a hexad skewed set of conventional sensors for body rate and body acceleration, and triple integrated actuators.
Space teleoperations technology for Space Station evolution
NASA Technical Reports Server (NTRS)
Reuter, Gerald J.
1990-01-01
Viewgraphs on space teleoperations technology for space station evolution are presented. Topics covered include: shuttle remote manipulator system; mobile servicing center functions; mobile servicing center technology; flight telerobotic servicer-telerobot; flight telerobotic servicer technology; technologies required for space station assembly; teleoperation applications; and technology needs for space station evolution.
Multiplexing electro-optic architectures for advanced aircraft integrated flight control systems
NASA Technical Reports Server (NTRS)
Seal, D. W.
1989-01-01
This report describes the results of a 10 month program sponsored by NASA. The objective of this program was to evaluate various optical sensor modulation technologies and to design an optimal Electro-Optic Architecture (EOA) for servicing remote clusters of sensors and actuators in advanced aircraft flight control systems. The EOA's supply optical power to remote sensors and actuators, process the modulated optical signals returned from the sensors, and produce conditioned electrical signals acceptable for use by a digital flight control computer or Vehicle Management System (VMS) computer. This study was part of a multi-year initiative under the Fiber Optic Control System Integration (FOCSI) program to design, develop, and test a totally integrated fiber optic flight/propulsion control system for application to advanced aircraft. Unlike earlier FOCSI studies, this program concentrated on the design of the EOA interface rather than the optical transducer technology itself.
NASA Technical Reports Server (NTRS)
Kizer, J. A.
1981-01-01
Inspections of the C-130 composite-reinforced center wings were conducted over the flight service monitoring period of more than six years. Twelve inspections were conducted on each of the two C-130H airplanes having composite reinforced center wing boxes. Each inspection consisted of visual and ultrasonic inspection of the selective boron-epoxy reinforced center wings which included the inspection of the boron-epoxy laminates and the boron-epoxy reinforcement/aluminum structure adhesive bondlines. During the flight service monitoring period, the two C-130H aircraft accumulated more than 10,000 flight hours and no defects were detected in the inspections over this period. The successful performance of the C-130H aircraft with composite-reinforced center wings allowed the transfer of the responsibilities of inspecting and maintaining these two aircraft to the U. S. Air Force.
An evaluation of the Goddard Space Flight Center Library
NASA Technical Reports Server (NTRS)
Herner, S.; Lancaster, F. W.; Wright, N.; Ockerman, L.; Shearer, B.; Greenspan, S.; Mccartney, J.; Vellucci, M.
1979-01-01
The character and degree of coincidence between the current and future missions, programs, and projects of the Goddard Space Flight Center and the current and future collection, services, and facilities of its library were determined from structured interviews and discussions with various classes of facility personnel. In addition to the tabulation and interpretation of the data from the structured interview survey, five types of statistical analyses were performed to corroborate (or contradict) the survey results and to produce useful information not readily attainable through survey material. Conclusions reached regarding compatability between needs and holdings, services and buildings, library hours of operation, methods of early detection and anticipation of changing holdings requirements, and the impact of near future programs are presented along with a list of statistics needing collection, organization, and interpretation on a continuing or longitudinal basis.
Aircraft surface coatings study: Verification of selected materials
NASA Technical Reports Server (NTRS)
1980-01-01
Three liquid coatings and four films that might improve and/or maintain the smoothness of transport aircraft surfaces are considered. Laboratory tests were performed on the liquid coatings (elastomeric polyurethanes) exposed to synthetic type hydraulic fluid, with and without a protective topcoat. Results were analyzed of a 14-month flight service evaluation of coatings applied to leading edges of an airline 727. Two additional airline service evaluations were initiated. Labortory tests were conducted on the films, bonded to aluminum substrate with various adhesives, to determine the best film/adhesive combinations. A cost/benefits analysis was performed and recommendations made for future work toward the application of this technology to commercial transports.
International Space Station Medical Project
NASA Technical Reports Server (NTRS)
Starkey, Blythe A.
2008-01-01
The goals and objectives of the ISS Medical Project (ISSMP) are to: 1) Maximize the utilization the ISS and other spaceflight platforms to assess the effects of longduration spaceflight on human systems; 2) Devise and verify strategies to ensure optimal crew performance; 3) Enable development and validation of a suite of integrated physical (e.g., exercise), pharmacologic and/or nutritional countermeasures against deleterious effects of space flight that may impact mission success or crew health. The ISSMP provides planning, integration, and implementation services for Human Research Program research tasks and evaluation activities requiring access to space or related flight resources on the ISS, Shuttle, Soyuz, Progress, or other spaceflight vehicles and platforms. This includes pre- and postflight activities; 2) ISSMP services include operations and sustaining engineering for HRP flight hardware; experiment integration and operation, including individual research tasks and on-orbit validation of next generation on-orbit equipment; medical operations; procedures development and validation; and crew training tools and processes, as well as operation and sustaining engineering for the Telescience Support Center; and 3) The ISSMP integrates the HRP approved flight activity complement and interfaces with external implementing organizations, such as the ISS Payloads Office and International Partners, to accomplish the HRP's objectives. This effort is led by JSC with Baseline Data Collection support from KSC.
NASA Technical Reports Server (NTRS)
Nylen, W. E.
1974-01-01
Guest pilot evaluation results of an approach profile modification for reducing ground level noise under the approach of jet aircraft runways are reported. Evaluation results were used to develop a two segmented landing approach procedure and equipment necessary to obtain pilot, airline, and FAA acceptance of the two segmented flight as a routine way of operating aircraft on approach and landing. Data are given on pilot workload and acceptance of the procedure.
STATUS AND FUTURE POSSIBILITIES OF DOMESTIC FLIGHTS BY FOREIGN AIRLINES
NASA Astrophysics Data System (ADS)
Hibino, Naohiko; Kobayashi, Yuki; Morichi, Shigeru
As a regional strategy, it is very important for local cities that international flights are put into service to local airports and to increase tourists. It is problemati c for the airlines that their international flights are put into service directly between the local airport and the international airport since it is difficult for them to secure the number of passengers needed to operate the aircraft. Co ncerning 1-stop flights, there is a good possibility of securing number of passengers. Therefore, the study illustrated the possibilities of domestic airline flights by foreign airlines as international flights.
The Flight Service Station Training Program : 1981-1985.
DOT National Transportation Integrated Search
1986-06-01
This report describes the performance of the ATC classes in the Flight Service Station Training Program 1981 to 1985 on the skills tests and laboratory exercises in Preflight (pilot briefing), Inflight, and Emergency Services. Over 80% of the final g...
Service evaluation of aluminum-brazed titanium (ABTi). [aircraft structures
NASA Technical Reports Server (NTRS)
Elrod, S. D.
1981-01-01
Long term creep-rupture, flight service and jet engine exhaust tests on aluminum-brazed titanium (ABTi), originally initiated under the DOT/SST follow-on program, were completed. These tests included exposure to natural airline service environments for up to 6 years. The results showed that ABTi has adequate corrosion resistance for long time commercial airplane structural applications. Special precautions are required for those sandwich structures designed for sound attenuation that utilize perforated skins. ABTi was also shown to have usable creep-rupture strength and to be metallurgically stable at temperatures up to 425 C (800 F).
TRISTAR 1: Evaluation methods for testing head-up display (HUD) flight symbology
NASA Technical Reports Server (NTRS)
Newman, R. L.; Haworth, L. A.; Kessler, G. K.; Eksuzian, D. J.; Ercoline, W. R.; Evans, R. H.; Hughes, T. C.; Weinstein, L. F.
1995-01-01
The first in a series of piloted head-up display (HUD) flight symbology studies (TRISTAR) measuring pilot task performance was conducted at the NASA Ames Research Center by the Tri-Service Flight Symbology Working Group (FSWG). Sponsored by the U.S. Army Aeroflightdynamics Directorate, this study served as a focal point for the FSWG to examine HUD test methodology and flight symbology presentations. HUD climb-dive marker dynamics and climb-dive ladder presentations were examined as pilots performed air-to-air (A/A), air-to-ground (A/G), instrument landing system (ILS), and unusual attitude (UA) recover tasks. Symbolic presentations resembled pitch ladder variations used by the U.S. Air Force (USAF), U.S. Navy (USN), and Royal Air Force (RAF). The study was initiated by the FSWG to address HUD flight symbology deficiencies, standardization, issue identification, and test methodologies. It provided the mechanism by which the USAF, USN, RAF, and USA could integrate organizational ideas and reduce differences for comparisons. Specifically it examined flight symbology issues collectively identified by each organization and the use of objective and subjective text methodology and flight tasking proposed by the FSWG.
Flight service evaluation of composite helicopter components
NASA Technical Reports Server (NTRS)
Mardoian, George H.; Ezzo, Maureen B.
1990-01-01
An assessment is presented of ten composite tail rotor spars and four horizontal stabilizers exposed to the effects of in-flight commercial service for up to nine years to establish realistic environmental factors for use in future designs. This evaluation is supported by test results of helicopter components and panels which have been exposed to outdoor environmental effects since 1979. Full scale static and fatigue tests were conducted on graphite/epoxy and Kevlar/epoxy composite components removed from Sikorsky Model S-76 helicopters in commercial operations off the Gulf Coast of Louisiana. Small scale static and fatigue tests were conducted on coupons obtained from panels exposed to outdoor conditions in Stratford, CT and West Palm Beach, Florida. The panel materials and ply configurations were representative of the S-76 components. The results are discussed of moisture analyses and strength tests on both the S-76 components and composite panels after up to nine years of outdoor exposure. Full scale tests performed on the helicopter components did not disclose any significant reductions from the baseline strengths. The results increased confidence in the long term durability of advanced composite materials in helicopter structural applications.
NASA Technical Reports Server (NTRS)
1982-01-01
Liquid, spray on elastomeric polyurethanes are selected and investigated as best candidates for aircraft external protective coatings. Flight tests are conducted to measure drag effects of these coatings compared to paints and a bare metal surface. The durability of two elastometric polyurethanes are assessed in airline flight service evaluations. Laboratory tests are performed to determine corrosion protection properties, compatibility with aircraft thermal anti-icing systems, the effect of coating thickness on erosion durability, and the erosion characteristics of composite leading edges-bare and coated. A cost and benefits assessment is made to determine the economic value of various coating configurations to the airlines.
NASA Technical Reports Server (NTRS)
Tanner, C. S.; Glass, R. E.
1973-01-01
A series of seven noise measurements were made each day over a period of fifteen days. The first and last flights each day were made by a specially instrumented 727-200 aircraft being used to evaluate the operational effectiveness of two-segment noise abatement approaches in scheduled service. Noise measurements were made to determine the noise reduction benefits of the two-segment approaches.
77 FR 47911 - Notice of a Change in Direction Finder Availability in Alaska
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... no flight assists, nor usage of DF equipment for orientation services. Newer technologies such as... approaches in Alaska. DF usage for pilot orientation has become almost non-existent. Since 2004, the Alaska Flight Service Information Area Group (AFSIAG) has documented eight flight assists that involved lost or...
Air medical referring customer satisfaction: a valuable insight.
Fultz, J H; Coyle, C B; Reynolds, P W
1998-01-01
To remain competitive and survive, air medical programs must have a mechanism for obtaining customer feedback, especially when alternate transport options are available. The goal of this survey was to examine the air medical service's performance as perceived by customers requesting the transport. Surveys were mailed to 400 referring customers who had contact with the flight crew during the transition of patient care. The survey consisted of 16 statements evaluating the service by using a 4-point Likert scale, three demographic questions, one statement evaluating overall satisfaction, and two open-ended questions for comments or suggestions. Two hundred forty-four surveys were returned for a 61% responses rate. Results indicated referring customers are satisfied with the service provided Written comments and suggestions were divided into two categories, positive comments and suggestions for improvement. Three common themes were identified within the suggestions for improvement: crew rapport, communications, and operations. Suggested improvements were evaluated, and selected strategies were incorporated into program operation. Customer feedback furnishes valuable insight into their needs and perception of a service. Comments and suggestions for improvement can promote critical inquiry into service operation and provide a catalyst for improvement.
Skylab rescue space vehicle flight readiness test
NASA Technical Reports Server (NTRS)
Jevitt, S. J.
1973-01-01
A Skylab Rescue Space Vehicle flight readiness test is described which ensures that space vehicle systems are in a state of flight readiness and are compatible with associated ground support equipment. The functions of propellant loading, umbilical ejection, ignition, holddown arm release, liftoff, and service arm and tail service mast retraction are simulated. The test outline is presented along with a list of references, intercommunications information, operations interface control chart, and flight test.
1997-01-16
KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility make final adjustments to the Flight Support System (FSS) for STS-82, the second Hubble Space Telescope servicing mission. The FSS is reusable flight hardware that provides the mechanical, structural and electrical interfaces between HST, the space support equipment and the orbiter for payload retrieval and on-orbit servicing. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.
Simulated airline service experience with laminar-flow control leading-edge systems
NASA Technical Reports Server (NTRS)
Maddalon, Dal V.; Fisher, David F.; Jennett, Lisa A.; Fischer, Michael C.
1987-01-01
The first JetStar leading edge flight test was made November 30, 1983. The JetStar was flown for more than 3 years. The titanium leading edge test articles today remain in virtually the same condition as they were in on that first flight. No degradation of laminar flow performance has occurred as a result of service. The JetStar simulated airline service flights have demonstrated that effective, practical leading edge systems are available for future commercial transports. Specific conclusions based on the results of the simulated airline service test program are summarized.
1993-06-30
This photograph shows STS-61 crewmemmbers training for the Hubble Space Telescope (HST) servicing mission in the Marshall Space Flight Center's (MSFC's) Neutral Buoyancy Simulator (NBS). Two months after its deployment in space, scientists detected a 2-micron spherical aberration in the primary mirror of the HST that affected the telescope's ability to focus faint light sources into a precise point. This imperfection was very slight, one-fiftieth of the width of a human hair. A scheduled Space Service servicing mission (STS-61) in 1993 permitted scientists to correct the problem. The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing.
29 CFR 825.801 - Special rules for airline flight crew employees, hours of service requirement.
Code of Federal Regulations, 2014 CFR
2014-07-01
... DIVISION, DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Special Rules Applicable... personal commute time or time spent on vacation, medical, or sick leave. (c) An airline flight crew... service requirement. (a) An airline flight crew employee's eligibility for FMLA leave is to be determined...
29 CFR 825.801 - Special rules for airline flight crew employees, hours of service requirement.
Code of Federal Regulations, 2013 CFR
2013-07-01
... DIVISION, DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Special Rules Applicable... personal commute time or time spent on vacation, medical, or sick leave. (c) An airline flight crew... service requirement. (a) An airline flight crew employee's eligibility for FMLA leave is to be determined...
14 CFR 1214.105 - Apportionment and/or assignment of services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...
14 CFR 1214.105 - Apportionment and/or assignment of services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...
14 CFR 1214.105 - Apportionment and/or assignment of services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-22
... Standards Service Aviation Safety Inspectors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... responsible for the oversight of, a Flight Standards Service Aviation Safety Inspector, and had direct... . SUPPLEMENTARY INFORMATION: Authority for This Rulemaking The FAA's authority to issue rules on aviation safety...
NASA Technical Reports Server (NTRS)
Laughlin, M. S.; Murray, J. D.; Wear, M. L.; Van Baalen, M.
2016-01-01
INTRODUCTION Back pain during spaceflight has often been attributed to the lengthening of the spinal column due to the absence of gravity during both short and long-duration missions. Upon landing and re-adaptation to gravity, the spinal column reverts back to its original length thereby causing some individuals to experience pain and muscular spasms, while others experience no ill effects. With International Space Station (ISS) missions, cases of back pain and injury are more common post-flight, but little is known about the potential risk factors. Thus, the purpose of this project was to perform an initial evaluation of reported post-flight back pain and injury cases to relevant spaceflight risk factors in United States astronauts that have completed an ISS mission. METHODS All US astronauts who completed an ISS mission between Expeditions (EXP) 1 and 41 (2000-2015) were included in this evaluation. Forty-five astronauts (36 males and 9 females) completed 50 ISS missions during the study time period, as 5 astronauts completed 2 ISS missions. Researchers queried medical records of the 45 astronauts for occurrences of back pain and injury. A case was defined as any reported event of back pain or injury to the cervical, thoracic, lumbar, sacral, or coccyx spine regions. Data sources for the cases included the Flight Medicine Clinic's electronic medical record; Astronaut Strength, Conditioning and Rehabilitation electronic documentation; the Private Medical Conference tool; and the Space Medicine Operations Team records. Post-flight cases were classified as an early case if reported within 45 days of landing (R + 45) or a late case if reported from R + 46 to R + 365 days after landing (R + 1y). Risk factors in the astronaut population for back pain include age, sex, prior military service, and prior history of back pain. Additionally, spaceflight specific risk factors such as type of landing vehicle and onboard exercise countermeasures were included to evaluate their contribution to post-flight cases. Prior history of back pain included back pain recorded in the medical record within 3 years prior to launch. Landing vehicle was included in the model to discern if more astronauts experienced back pain or injury following a Shuttle or Soyuz landing. Onboard exercise countermeasures were noted for those astronauts who had a mission following 2009 deployment of the Advanced Resistive Exercise Device (aRED) (EXP 19 to 41). T-test and chi-squared tests were performed to evaluate the association between each individual risk factor and post-flight case. Logistic regression was used to evaluate the combined contribution of all the risk factors on post-flight cases. Separate models were calculated for cases reported by R + 45 and R + 1y. RESULTS During the study time period, there were 13 post-flight cases reported by R + 45 and an additional 5 reported by R + 1y. Most of these cases have been reported since EXP 19 with 10 cases by R + 45 and 4 by R + 1y. Individual risk factors of age, sex, landing vehicle, and prior military service were not significantly associated with post-flight cases identified at R + 45 or R + 1y (p greater than 0.05). Having back pain or injury within 3 years prior to launch significantly increased the likelihood of becoming a case by R + 1y (p = 0.041), but not at R+45 (p=0.204). Additionally, astronauts who experienced onboard exercise countermeasures that included aRED had a significantly increased risk of becoming a case at R + 45 (p = 0.024) and R + 1y (p=0.003). Multiple logistic regression evaluating all the risk factors for cases identified no significant risk factors at either the R + 45 or R + 1y time period (p greater than 0.05). Overall model fit was poor for both the R + 45 (R(exp 2) = 0.132) and R + 1y (R(exp 2) = 0.186) cases showing that there are risk factors not represented in our model. CONCLUSIONS Regardless of cause, post-flight cases are reported more often since aRED was deployed in 2009. This may reflect improved documentation or unidentified risk factors. No spaceflight risk factor explains the data fully. Post-flight cases are probably due to multi-faceted factors that are not easily elucidated in the medical data.
Shuttle and ISS Food Systems Management
NASA Technical Reports Server (NTRS)
Kloeris, Vickie
2000-01-01
Russia and the U.S. provide the current International Space Station (ISS) food system. Each country contributes half of the food supply in their respective flight food packaging. All of the packaged flight food is stowed in Russian provided containers, which interface with the Service Module galley. Each country accepts the other's flight worthiness inspections and qualifications. Some of the food for the first ISS crew was launched to ISS inside the Service Module in July of 2000, and STS-106 in September 2000 delivered more food to the ISS. All subsequent food deliveries will be made by Progress, the Russian re-supply vehicle. The U.S. will ship their portion of food to Moscow for loading onto the Progress. Delivery schedules vary, but the goal is to maintain at least a 45-day supply onboard ISS at all times. The shelf life for ISS food must be at least one year, in order to accommodate the long delivery cycle and onboard storage. Preservation techniques utilized in the US food system include dehydration, thermo stabilization, intermediate moisture, and irradiation. Additional fresh fruits and vegetables will be sent with each Progress and Shuttle flights as permitted by volume allotments. There is limited refrigeration available on the Service Module to store fresh fruits and vegetables. Astronauts and cosmonauts eat half U.S. and half Russian food. Menu planning begins 1 year before a planned launch. The flight crews taste food in the U.S. and in Russia and rate the acceptability. A preliminary menu is planned, based on these ratings and the nutritional requirements. The preliminary menu is then evaluated by the crews while training in Russia. Inputs from this evaluation are used to finalize the menu and flight packaging is initiated. Flight food is delivered 6 weeks before launch. The current challenge for the food system is meeting the nutritional requirements, especially no more than 10 mg iron, and 3500 mg sodium. Experience from Shuttle[Mir also indicated insufficient caloric intake for many crewmembers. Additional thermostabilized and irradiated foods have been developed for ISS to improve the ease of preparation and overall acceptability. Dehydrated foods offer limited advantage, since water must be delivered to ISS. An effort is underway to introduce other International Partner's food into the ISS food system. At first this will be one or two selected foods with the potential for more as the program matures. An increase in the variety of available foods would improve the overall acceptability. Additional galley capability will be required when the crew size increases on ISS. Anticipated improvements include freezers, refrigerators and microwave ovens. All of the ISS food development efforts are devoted to improving the food acceptability and subsequent consumption and mission success
James, Dorsha N; Voskresensky, Igor V; Jack, Meg; Cotton, Bryan A
2009-06-01
Pre-hospital airway management represents the intervention most likely to impact outcomes in critically injured patients. As such, airway management issues dominate quality improvement (QI) reviews of aero-medical programs. The purpose of this study was to evaluate current practice patterns of airway management in trauma among U.S. aero-medical service (AMS) programs. The Association of Air Medical Services (AAMS) Resource Guide from 2005 to 2006 was utilized to identify the e-mail addresses of all directors of U.S. aero-medical transport programs. Program directors from 182 U.S. aero-medical programs were asked to participate in an anonymous, web-based survey of emergency airway management protocols and practices. Non-responders to the initial request were contacted a second time by e-mail. 89 programs responded. 98.9% have rapid sequence intubation (RSI) protocols. 90% use succinylcholine, 70% use long-acting neuromuscular blockers (NMB) within their RSI protocol. 77% have protocols for mandatory in-flight sedation but only 13% have similar protocols for maintenance paralytics. 60% administer long-acting NMB immediately after RSI, 13% after confirmation of neurological activity. Given clinical scenarios, however, 97% administer long-acting NMB to patients with scene and in-flight Glasgow Coma Scale (GCS) of 3, even for brief transport times. The majority of AMS programs have well defined RSI and in-flight sedation protocols, while protocols for in-flight NMB are uncommon. Despite this, nearly all programs administer long-acting NMB following RSI, irrespective of GCS or flight time. Given the impact of in-flight NMB on initial assessment, early intervention, and injury severity scoring, a critical appraisal of current AMS airway management practices appears warranted.
A Cooperative Human-Adaptive Traffic Simulation (CHATS)
NASA Technical Reports Server (NTRS)
Phillips, Charles T.; Ballin, Mark G.
1999-01-01
NASA is considering the development of a Cooperative Human-Adaptive Traffic Simulation (CHATS), to examine and evaluate performance of the National Airspace System (NAS) as the aviation community moves toward free flight. CHATS will be specifically oriented toward simulating strategic decision-making by airspace users and by the service provider s traffic management personnel, within the context of different airspace and rules assumptions. It will use human teams to represent these interests and make decisions, and will rely on computer modeling and simulation to calculate the impacts of these decisions. The simulation objectives will be to examine: 1. evolution of airspace users and the service provider s strategies, through adaptation to new operational environments; 2. air carriers competitive and cooperative behavior; 3. expected benefits to airspace users and the service provider as compared to the current NAS; 4. operational limitations of free flight concepts due to congestion and safety concerns. This paper describes an operational concept for CHATS, and presents a high-level functional design which would utilize a combination of existing and new models and simulation capabilities.
Barratt with TVIS in Service module
2009-04-23
ISS019-E-009818 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barratt with TVIS in Service module
2009-04-23
ISS019-E-009857 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barratt with TVIS in Service module
2009-04-23
ISS019-E-009840 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barratt with TVIS in Service module
2009-04-23
ISS019-E-009856 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barratt with TVIS in Service module
2009-04-23
ISS019-E-009819 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Code of Federal Regulations, 2013 CFR
2013-01-01
... service animal in the cabin; (9) Transportation of a service animal on a flight segment scheduled to take... disability to provide advance notice in order to obtain certain specific services in connection with a flight... Nondiscrimination and Access to Services and Information § 382.27 May a carrier require a passenger with a...
Code of Federal Regulations, 2014 CFR
2014-01-01
... service animal in the cabin; (9) Transportation of a service animal on a flight segment scheduled to take... disability to provide advance notice in order to obtain certain specific services in connection with a flight... Nondiscrimination and Access to Services and Information § 382.27 May a carrier require a passenger with a...
14 CFR § 1214.105 - Apportionment and/or assignment of services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...
NASA Technical Reports Server (NTRS)
Wright, Michael R.
1999-01-01
With over two dozen missions since the first in 1986, the Hitchhiker project has a reputation for providing quick-reaction, low-cost flight services for Shuttle Small Payloads Project (SSPP) customers. Despite the successes, several potential improvements in customer payload integration and test (I&T) deserve consideration. This paper presents suggestions to Hitchhiker customers on how to help make the I&T process run smoother. Included are: customer requirements and interface definition, pre-integration test and evaluation, configuration management, I&T overview and planning, problem mitigation, and organizational communication. In this era of limited flight opportunities and new ISO-based requirements, issues such as these have become more important than ever.
NASA Technical Reports Server (NTRS)
Pride, R. A.
1978-01-01
Interim results from a number of ongoing, long-term environmental effects programs for composite materials are reported. The flight service experience is evaluated for 142 composite aircraft components after more than five years and one million successful component flight hours. Ground-based outdoor exposures of composite material coupons after 3 years of exposure at five sites have reached equilibrium levels of moisture pickup which are predictable. Solar ultraviolet-induced material loss is discussed for these same exposures. No significant degradation has been observed in residual strength for either stressed or unstressed specimens, or for exposures to aviation fuels and fluids.
2014-06-08
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion service module has been secured in the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-08
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion service module has been secured in the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
Airborne gamma radiation soil moisture measurements over short flight lines
NASA Technical Reports Server (NTRS)
Peck, Eugene L.; Carrol, Thomas R.; Lipinski, Daniel M.
1990-01-01
Results are presented on airborne gamma radiation measurements of soil moisture condition, carried out along short flight lines as part of the First International Satellite Land Surface Climatology Project Field Experiment (FIFE). Data were collected over an area in Kansas during the summers of 1987 and 1989. The airborne surveys, together with ground measurements, provide the most comprehensive set of airborne and ground truth data available in the U.S. for calibrating and evaluating airborne gamma flight lines. Analysis showed that, using standard National Weather Service weights for the K, Tl, and Gc radiation windows, the airborne soil moisture estimates for the FIFE lines had a root mean square error of no greater than 3.0 percent soil moisture. The soil moisture estimates for sections having acquisition time of at least 15 sec were found to be reliable.
Apollo 16 mission report. Supplement 2: Service Propulsion system final flight evaluation
NASA Technical Reports Server (NTRS)
Smith, R. J.; Wood, S. C.
1974-01-01
The Apollo 16 Mission was the sixteenth in a series of flights using Apollo flight hardware and included the fifth lunar landing of the Apollo Program. The Apollo 16 Mission utilized CSM 113 which was equipped with SPS Engine S/N 66 (Injector S/N 137). The engine configuration and expected performance characteristics are presented. Since previous flight results of the SPS have consistently shown the existence of a negative mixture ratio shift, SPS Engine S/N 66 was reorificed to increase the mixture ratio for this mission. The propellant unbalance for the two major engine firings is compared with the predicted unbalance. Although the unbalance at the end of the TEI burn is significantly different than the predicted unbalance, the propellant mixture ratio was well within limits. The SPS performed six burns during the mission, with a total burn duration of 575.3 seconds. The ignition time, burn duration and velocity gain for each of the six SPS burns are reported.
NASA Technical Reports Server (NTRS)
Johnston, J. F.
1979-01-01
Active wing load alleviation to extend the wing span by 5.8 percent, giving a 3 percent reduction in cruise drag is covered. The active wing load alleviation used symmetric motions of the outboard ailerons for maneuver load control (MLC) and elastic mode suppression (EMS), and stabilizer motions for gust load alleviation (GLA). Slow maneuvers verified the MLC, and open and closed-loop flight frequency response tests verified the aircraft dynamic response to symmetric aileron and stabilizer drives as well as the active system performance. Flight tests in turbulence verified the effectiveness of the active controls in reducing gust-induced wing loads. It is concluded that active wing load alleviation/extended span is proven in the L-1011 and is ready for application to airline service; it is a very practical way to obtain the increased efficiency of a higher aspect ratio wing with minimum structural impact.
NASA Langley and NLR Research of Distributed Air/Ground Traffic Management
NASA Technical Reports Server (NTRS)
Ballin, Mark G.; Hoekstra, Jacco M.; Wing, David J.; Lohr, Gary W.
2002-01-01
Distributed Air/Ground Traffic Management (DAG-TM) is a concept of future air traffic operations that proposes to distribute information, decision-making authority, and responsibility among flight crews, the air traffic service provider, and aeronautical operational control organizations. This paper provides an overview and status of DAG-TM research at NASA Langley Research Center and the National Aerospace Laboratory of The Netherlands. Specific objectives of the research are to evaluate the technical and operational feasibility of the autonomous airborne component of DAG-TM, which is founded on the operational paradigm of free flight. The paper includes an overview of research approaches, the airborne technologies under development, and a summary of experimental investigations and findings to date. Although research is not yet complete, these findings indicate that free flight is feasible and will significantly enhance system capacity and safety. While free flight cannot alone resolve the complex issues faced by those modernizing the global airspace, it should be considered an essential part of a comprehensive air traffic management modernization activity.
STS-61 Space Shuttle mission report
NASA Technical Reports Server (NTRS)
Fricke, Robert W., Jr.
1994-01-01
The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.
NASA Range Safety Annual Report 2007
NASA Technical Reports Server (NTRS)
Dumont, Alan G.
2007-01-01
As always, Range Safety has been involved in a number of exciting and challenging activities and events. Throughout the year, we have strived to meet our goal of protecting the public, the workforce, and property during range operations. During the past year, Range Safety was involved in the development, implementation, and support of range safety policy. Range Safety training curriculum development was completed this year and several courses were presented. Tailoring exercises concerning the Constellation Program were undertaken with representatives from the Constellation Program, the 45th Space Wing, and the Launch Constellation Range Safety Panel. Range Safety actively supported the Range Commanders Council and it subgroups and remained involved in updating policy related to flight safety systems and flight safety analysis. In addition, Range Safety supported the Space Shuttle Range Safety Panel and addressed policy concerning unmanned aircraft systems. Launch operations at Kennedy Space Center, the Eastern and Western ranges, Dryden Flight Research Center, and Wallops Flight Facility were addressed. Range Safety was also involved in the evaluation of a number of research and development efforts, including the space-based range (formerly STARS), the autonomous flight safety system, the enhanced flight termination system, and the joint advanced range safety system. Flight safety system challenges were evaluated. Range Safety's role in the Space Florida Customer Assistance Service Program for the Eastern Range was covered along with our support for the Space Florida Educational Balloon Release Program. We hope you have found the web-based format both accessible and easy to use. Anyone having questions or wishing to have an article included in the 2008 Range Safety Annual Report should contact Alan Dumont, the NASA Range Safety Program Manager located at the Kennedy Space Center, or Michael Dook at NASA Headquarters.
38 CFR 21.134 - Limitation on flight training.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...
38 CFR 21.134 - Limitation on flight training.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...
38 CFR 21.134 - Limitation on flight training.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...
38 CFR 21.134 - Limitation on flight training.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...
38 CFR 21.134 - Limitation on flight training.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...
14 CFR 415.127 - Flight safety system design and operation data.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation...: flight termination system; command control system; tracking; telemetry; communications; flight safety... control system. (7) Flight termination system component storage, operating, and service life. A listing of...
Astronaut Training in the Neutral Buoyancy Simulator
NASA Technical Reports Server (NTRS)
1993-01-01
This photograph shows an STS-61 astronaut training for the Hubble Space Telescope (HST) servicing mission (STS-61) in the Marshall Space Flight Center's (MSFC's) Neutral Buoyancy Simulator (NBS). Two months after its deployment in space, scientists detected a 2-micron spherical aberration in the primary mirror of the HST that affected the telescope's ability to focus faint light sources into a precise point. This imperfection was very slight, one-fiftieth of the width of a human hair. A scheduled Space Service servicing mission (STS-61) in 1993 permitted scientists to correct the problem. The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing.
History of Hubble Space Telescope (HST)
1993-07-09
This photograph shows an STS-61 astronaut training for the Hubble Space Telescope (HST) servicing mission (STS-61) in the Marshall Space Flight Center's (MSFC's) Neutral Buoyancy Simulator (NBS). Two months after its deployment in space, scientists detected a 2-micron spherical aberration in the primary mirror of the HST that affected the telescope's ability to focus faint light sources into a precise point. This imperfection was very slight, one-fiftieth of the width of a human hair. A scheduled Space Service servicing mission (STS-61) in 1993 permitted scientists to correct the problem. The MSFC NBS provided an excellent environment for testing hardware to examine how it would operate in space and for evaluating techniques for space construction and spacecraft servicing.
NASA Technical Reports Server (NTRS)
1973-01-01
Planetary quarantine requirements and parameters are evaluated for their effects upon automated spacecraft flights data describing the heat resistance of naturally occuring microorganisms and sterilization requirements are analyzed and a possible method for assessment of these data is developed. Pertinent data from planetary mission microbial contamination logs are compiled and maintained in the quarantine document system.
Engine bleed air reduction in DC-10
NASA Technical Reports Server (NTRS)
Newman, W. H.; Viele, M. R.
1980-01-01
An 0.8 percent fuel savings was achieved by a reduction in engine bleed air through the use of cabin air recirculation. The recirculation system was evaluated in revenue service on a DC-10. The cabin remained comfortable with reductions in cabin fresh air (engine bleed air) as much as 50 percent. Flight test verified the predicted fuel saving of 0.8 percent.
Damage tolerance certification of a fighter horizontal stabilizer
NASA Astrophysics Data System (ADS)
Huang, Jia-Yen; Tsai, Ming-Yang; Chen, Jong-Sheng; Ong, Ching-Long
1995-05-01
A review of the program for the damage tolerance certification test of a composite horizontal stabilizer (HS) of a fighter is presented. The object of this program is to certify that the fatigue life and damage tolerance strength of a damaged composite horizontal stabilizer meets the design requirements. According to the specification for damage tolerance certification, a test article should be subjected to two design lifetimes of flight-by-flight load spectra simulating the in-service fatigue loading condition for the aircraft. However, considering the effect of environmental change on the composite structure, one additional lifetime test was performed. In addition, to evaluate the possibilities for extending the service life of the structure, one more lifetime test was carried out with the spectrum increased by a factor of 1.4. To assess the feasibility and reliability of repair technology on a composite structure, two damaged areas were repaired after two lifetimes of damage tolerance test. On completion of four lifetimes of the damage tolerance test, the static residual strength was measured to check whether structural strength after repair met the requirements. Stiffness and static strength of the composite HS with and without damage were evaluated and compared.
Tyurin in Zvezda Service module
2007-03-01
ISS014-E-15711 (1 March 2007) --- Cosmonaut Mikhail Tyurin, Expedition 14 flight engineer representing Russia's Federal Space Agency, disconnects a SKV1 heat exchanger unit during in-flight maintenance (IFM) in the Zvezda Service Module of the International Space Station.
Wakata with TVIS in Service module
2009-04-23
ISS019-E-009824 (23 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Wakata with TVIS in Service module
2009-04-23
ISS019-E-009853 (23 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barratt with TVIS in Service module
2009-04-22
ISS019-E-009491 (22 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, poses for a photo with the Treadmill Vibration Isolation System (TVIS) during in-flight maintenance operations in the Zvezda Service Module of the International Space Station.
14 CFR 1214.806 - Premature termination of Spacelab flights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...
14 CFR 1214.806 - Premature termination of Spacelab flights.
Code of Federal Regulations, 2013 CFR
2013-01-01
... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...
14 CFR 1214.806 - Premature termination of Spacelab flights.
Code of Federal Regulations, 2012 CFR
2012-01-01
... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...
14 CFR 1214.806 - Premature termination of Spacelab flights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...
14 CFR § 1214.806 - Premature termination of Spacelab flights.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... If a dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro...
An overview of the Office of Space Flight satellite servicing program plan
NASA Technical Reports Server (NTRS)
Levin, George M.; Erwin, Harry O., Jr.
1987-01-01
A comprehensive program for the development of satellite servicing tools and techniques is being currently carried out by the Office of Space Flight. The program is based on a satellite servicing infrastructure formulated by analyzing satellite servicing requirements; the program is Shuttle-based and compatible with the Orbital Maneuvering Vehicle and Space Station. The content of the satellite servicing program is reviewed with reference to the tools, techniques, and procedures being developed for refueling (or consumables resupply), repairing, and retrieving.
1990-03-30
systems on the DoD in terms of safety and operational- effectiveness and probable impacts on specific Air Force mission requirements. The report does... Systems ................................. 2-21 2.1.3 Flight Service and Weather Systems .......................... 2-22 2.1.3.1 Flight Service Automation...2-41 2.2.2 Terminal Control and Landing Systems .. ....................... 2-44 2.2.3 Flight Information and Weather Systems
Williams with TVIS hardware in Zvezda Service module
2007-02-26
ISS014-E-15136 (26 Feb. 2007) --- Astronaut Sunita L. Williams, Expedition 14 flight engineer, performs maintenance work on the Treadmill Vibration Isolation System (TVIS) during routine in-flight maintenance (IFM) in the Zvezda Service Module of the International Space Station.
Space Station flight telerobotic servicer functional requirements development
NASA Technical Reports Server (NTRS)
Oberright, John; Mccain, Harry; Whitman, Ruth I.
1987-01-01
The Space Station flight telerobotic servicer (FTS), a flight robotic system for use on the first Space Station launch, is described. The objectives of the FTS program include: (1) the provision of an alternative crew EVA by supporting the crew in assembly, maintenance, and servicing activities, and (2) the improvement of crew safety by performing hazardous tasks such as spacecraft refueling or thermal and power system maintenance. The NASA/NBS Standard Reference Model provides the generic, hierarchical, structured functional control definition for the system. It is capable of accommodating additional degrees of machine intelligence in the future.
Pressure effects on the nose by an in-flight oxygen mask during simulated flight conditions.
Schreinemakers, J Rieneke C; Boer, C; van Amerongen, P C G M; Kon, M
2016-12-01
Dutch F-16 fighter pilots experience oxygen mask inflicted nasal trauma, including discomfort, pain, skin abrasions, bruises and bone remodelling. Pressure and shear forces on the nose might contribute to causing these adverse effects. In this study, it was evaluated how flight conditions affected the exerted pressure, and whether shear forces were present. The pressure exerted by the oxygen mask was measured in 20 volunteers by placing pressure sensors on the nose and chin underneath the mask. In the human centrifuge, the effects on the exerted pressure during different flight conditions were evaluated (+3G z , +6G z , +9G z , protocolised head movements, mounted visor or night vision goggles, NVG). The runs were recorded to evaluate if the mask's position changed during the run, which would confirm the presence of shear forces. Head movements increased the median pressure on the nose by 50 mm Hg and on the chin by 37 mm Hg. NVG, a visor and accelerative forces also increased the median pressure on the nose. Pressure drops on the nose were also observed, during mounted NVG (-63 mm Hg). The recordings showed the mask slid downwards, especially during the acceleration phase of the centrifuge run, signifying the presence of shear forces. The exerted pressure by the oxygen mask changes during different flight conditions. Exposure to changing pressures and to shear forces probably contributes to mask-inflicted nasal trauma. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.
14 CFR 1214.115 - Standard services.
Code of Federal Regulations, 2010 CFR
2010-01-01
....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...
14 CFR 1214.115 - Standard services.
Code of Federal Regulations, 2013 CFR
2013-01-01
....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...
14 CFR 1214.115 - Standard services.
Code of Federal Regulations, 2012 CFR
2012-01-01
....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...
ERIC Educational Resources Information Center
Katzman, Martin T.
The emphasis in this report is on how public service quality affects urban decline and middle-class flight. It is pointed out that the key role in decline is played by neighborhood "external diseconomies," which result from the way municipal services are financed, produced, and distributed in metropolitan areas. It is also pointed out…
Stress in air traffic personnel : low-density towers and flight service stations.
DOT National Transportation Integrated Search
1977-09-01
Stress and anxiety levels were measured in 10 air traffic control specialists (ATCS) at two low-traffic-density towers, Fayetteville (FYV), Arkansas, and Roswell (ROW), New Mexico, and in 24 flight service (FS) specialists at Oklahoma City (OKC), Okl...
14 CFR 1214.116 - Typical optional services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...
14 CFR § 1214.116 - Typical optional services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Section § 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable... payload/orbiter integration and test. (e) Payload mission planning services, other than for launch...
14 CFR 1214.116 - Typical optional services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...
14 CFR 1214.116 - Typical optional services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...
14 CFR 1214.116 - Typical optional services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...
Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators
2017-07-07
AFRL-RH-FS-TR-2017-0026 Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators Thomas K. Kuyk Peter A. Smith Solangia...34Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators" (AFRL-RH-FS-TR- 2017 - 0026 SHORTER.PATRI CK.D.1023156390 Digitally...SUBTITLE Flight Tasks and Metrics to Evaluate Laser Eye Protection in Flight Simulators 5a. CONTRACT NUMBER FA8650-14-D-6519 5b. GRANT NUMBER 5c
Flight service evaluation of composite components on the Bell helicopter model 206L
NASA Technical Reports Server (NTRS)
Wilson, Henry
1993-01-01
This is the final report on the advanced composite components which were placed in service on the 206L LongRanger helicopters in the continental United States, Canada, and Alaska. This report covers all test data which was gathered, as well as maintenance histories of the parts. The previous reports describe the fabrication, service experiences, and test data through 1986. This report contains information from these references, as well as data gathered after 1986. The status of the 40 sets of components is discussed. Each set consisted of a vertical fin, forward fairing, litter door, and baggage door. Almost 500,000 flight hours were accumulated on the 160 parts, with the high-time part accumulating 14,687 flight hours. Over 60 percent of the parts were destructively tested to measure strength and stiffness retention over the course of the program. The vertical fins had the greatest strength retention followed by the litter doors. The baggage doors had the poorest retention of strength. There was very little difference in property retention between the four primary operating regions: Northwest U.S., Southwest U.S., Gulf of Mexico Coastal Region, and the Northeast U.S. and Eastern Canada Region. The field problems have ranged from two lightning-struck fins to significant delaminations in the baggage doors. There was only one environmentally related field incident, in which the glass windows on the litter doors were found to loosen due to high temperatures experienced in the southwest region.
Telescience in the Space Station era
NASA Technical Reports Server (NTRS)
Schmerling, E. R.
1988-01-01
Telescience refers to the development of systems where participants involved in research in space can access their fellow scientists and the appropriate NASA services before flight, during flight, and after flight, preferably from their home institutions and through the same equipment. Telescience requires integration of available technologies to develop computer environments that maintain interoperability across different disciplines and different portions of the lifetimes of space experiments, called teledesign, teleoperations, and teleanalysis. Participants in the NASA Telescience Testbed Program are using a rigid prototyping approach to evaluate the necessary technologies and select the options and tradeoffs that best suit their accustomed modalities. The concept of transaction management is described, where the emphasis is placed on the effects of commands, whether event-generated onboard the spacecraft or sent up from the ground. Interoperability, security, and privacy issues are also discussed, and the Telescience Testbed Pilot Program is described.
Investigation and evaluation of a computer program to minimize three-dimensional flight time tracks
NASA Technical Reports Server (NTRS)
Parke, F. I.
1981-01-01
The program for the DC 8-D3 flight planning was slightly modified for the three dimensional flight planning for DC 10 aircrafts. Several test runs of the modified program over the North Atlantic and North America were made for verifying the program. While geopotential height and temperature were used in a previous program as meteorological data, the modified program uses wind direction and speed and temperature received from the National Weather Service. A scanning program was written to collect required weather information from the raw data received in a packed decimal format. Two sets of weather data, the 12-hour forecast and 24-hour forecast based on 0000 GMT, are used for dynamic processes in testruns. In order to save computing time only the weather data of the North Atlantic and North America is previously stored in a PCF file and then scanned one by one.
76 FR 19267 - Pilot, Flight Instructor, and Pilot School Certification; Technical Amendment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
.... No. 61-127] RIN 2120-AI86 Pilot, Flight Instructor, and Pilot School Certification; Technical... for pilots, flight instructors, ground instructors, and pilot schools. This document reinstates two... Aviation and Commercial Division, Flight Standards Service, Federal Aviation Administration, 800...
NASA Technical Reports Server (NTRS)
Feir, J. B.
1974-01-01
Travel markets which would be served by high speed commercial transport aircraft and the ability of the airlines to schedule and route the aircraft in a way that would achieve good daily utilization and productivity are examined. The following areas are considered: (1) identification of the major long-haul city pairs that would most likely demand nonstop service; (2) selection of flight tracks observing alternative sonic boom restrictions; (3) estimation of flight times for all city pairs for the various sonic boom constraints; (4) impact of airport curfews on possible departure and arrival schedules; (5) projection of passenger traffic volumes on the selected city pairs; and (6) potential daily utilization and aircraft productivity.
NASA Technical Reports Server (NTRS)
Harvill, W. E.; Kizer, J. A.
1976-01-01
The advantageous structural uses of advanced filamentary composites are demonstrated by design, fabrication, and test of three boron-epoxy reinforced C-130 center wing boxes. The advanced development work necessary to support detailed design of a composite reinforced C-130 center wing box was conducted. Activities included the development of a basis for structural design, selection and verification of materials and processes, manufacturing and tooling development, and fabrication and test of full-scale portions of the center wing box. Detailed design drawings, and necessary analytical structural substantiation including static strength, fatigue endurance, flutter, and weight analyses are considered. Some additional component testing was conducted to verify the design for panel buckling, and to evaluate specific local design areas. Development of the cool tool restraint concept was completed, and bonding capabilities were evaluated using full-length skin panel and stringer specimens.
A flight test of laminar flow control leading-edge systems
NASA Technical Reports Server (NTRS)
Fischer, M. C.; Wright, A. S., Jr.; Wagner, R. D.
1983-01-01
NASA's program for development of a laminar flow technology base for application to commercial transports has made significant progress since its inception in 1976. Current efforts are focused on development of practical reliable systems for the leading-edge region where the most difficult problems in applying laminar flow exist. Practical solutions to these problems will remove many concerns about the ultimate practicality of laminar flow. To address these issues, two contractors performed studies, conducted development tests, and designed and fabricated fully functional leading-edge test articles for installation on the NASA JetStar aircraft. Systems evaluation and performance testing will be conducted to thoroughly evaluate all system capabilities and characteristics. A simulated airline service flight test program will be performed to obtain the operational sensitivity, maintenance, and reliability data needed to establish that practical solutions exist for the difficult leading-edge area of a future commercial transport employing laminar flow control.
14 CFR 1214.103 - Reimbursement for standard services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...
14 CFR 1214.103 - Reimbursement for standard services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...
14 CFR 1214.103 - Reimbursement for standard services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...
14 CFR 1214.103 - Reimbursement for standard services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...
14 CFR 1214.111 - Rendezvous services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Rendezvous services. 1214.111 Section 1214.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214...
14 CFR § 1214.115 - Standard services.
Code of Federal Regulations, 2014 CFR
2014-01-01
...§ 1214.115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...
Low-cost space flight for attached payloads
NASA Astrophysics Data System (ADS)
Perkins, Frederick W.
1991-07-01
An important addition to the emerging commercial space sector is Standard Space Platforms Corporation's comprehensive low-cost flight service delivery system for small and developmental payloads. Standard provides a privately funded, proprietary, value-added transportation service which dramatically reduces cost and program duration for compliant payloads. It also provides a business-to-business service which is compatible with business investment decision timing and technology development cycles.
Robotics and Automation for Flight Deck Aircraft Servicing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chesser, J.B.; Draper, J.V.; Pin, F.G.
1999-03-01
One of the missions of the Future Aircraft Carriers Program is to investigate methods that would improve aircraft turnaround servicing activities on carrier decks. The major objectives and criteria for evaluating alternative aircraft servicing methods are to reduce workload requirements, turnaround times (TAT), and life-cycle costs (LCC). Technologies in the field of Robotics and Automation (R and A) have the potential to significantly contribute to these objectives. The objective of this study was to investigate aircraft servicing functions on carrier decks which would offer the potentially most significant payoff if improved by various R and A technologies. Improvement in thismore » case means reducing workload, time and LCC. This objective was accomplished using a ''bottom-up'' formalized approach as described in the following.« less
2008-07-21
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center prepare to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-21
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2015 Annual Report for the Flight Opportunities Program
NASA Technical Reports Server (NTRS)
Van Dijk, Alexander
2015-01-01
Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.
14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...
14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...
14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...
14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...
14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...
Code of Federal Regulations, 2014 CFR
2014-10-01
... for ground vehicle identification and collision avoidance; (3) No more than two hundred 1090 MHz... utility station at an airport served by a control tower, RCO or FAA flight service station is the frequency used by the control tower for ground traffic control or by the flight service station for...
Tyurin and Williams in Zvezda Service module
2007-04-21
ISS014-E-19924 (21 April 2007) --- Cosmonaut Mikhail Tyurin (left), Expedition 14 flight engineer representing Russia's Federal Space Agency, and astronaut Sunita L. Williams, Expedition 15 flight engineer, drink beverages as they pose for a photo in the Zvezda Service Module of the International Space Station.
Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)
NASA Technical Reports Server (NTRS)
Stengle, Thomas; Hoge, Susan
2008-01-01
The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin engineers and technicians monitor the progress as a crane lowers the Orion service module into the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin technicians and engineers prepare to move the Orion service module to the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, prior to rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a Lockheed Martin technician monitors the progress as a crane lowers the Orion service module into the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin engineers and technicians help guide the Orion service module into the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin engineers and technicians monitor the progress as a crane lowers the Orion service module into the Final Assembly and System Testing, or FAST, cell. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
Mature data transport and command management services for the Space Station
NASA Technical Reports Server (NTRS)
Carper, R. D.
1986-01-01
The duplex space/ground/space data services for the Space Station are described. The need to separate the uplink data service functions from the command functions is discussed. Command management is a process shared by an operation control center and a command management system and consists of four functions: (1) uplink data communications, (2) management of the on-board computer, (3) flight resource allocation and management, and (4) real command management. The new data service capabilities provided by microprocessors, ground and flight nodes, and closed loop and open loop capabilities are studied. The need for and functions of a flight resource allocation management service are examined. The system is designed so only users can access the system; the problems encountered with open loop uplink access are analyzed. The procedures for delivery of operational, verification, computer, and surveillance and monitoring data directly to users are reviewed.
NASA Technical Reports Server (NTRS)
1983-01-01
A series of studies in which films and liquid spray-on materials were evaluated in the laboratory for transport aircraft external surface coatings are summarized. Elastomeric polyurethanes were found to best meet requirements. Two commercially available products, CAAPCO B-274 and Chemglaze M313, were subjected to further laboratory testing, airline service evaluations, and drag-measurement flight tests. It was found that these coatings were compatible with the severe operating environment of airlines and that coatings reduced airplane drag. An economic analysis indicated significant dollar benefits to airlines from application of the coatings.
2009-06-01
Sensor H11 HPM Chamber Test Capability—Explosive Equivalent Substitute H12 HEL Irradiance & Temperature H13 HEL Near/In-Beam Path Quality H14 HPM Sensor...such things as artillery shells or UAVs and may impact the earth. Possible targets include missiles in flight or a relatively close command, control...capability is a synergy of four high priority shortfalls identified by the T-SS Update. H13 —HEL near/in-beam path quality H13 is the need for a
14 CFR § 1214.103 - Reimbursement for standard services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Reimbursement for standard services. § 1214.103 Section § 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government...
NASA Glenn Research Center Support of the ASRG Project
NASA Technical Reports Server (NTRS)
Wilson, Scott D.; Wong, Wayne A.
2014-01-01
A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.
78 FR 35313 - Notice of Flight 93 Advisory Commission Meeting Change
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-12
... Flight 93 Advisory Commission Meeting Change AGENCY: National Park Service, Interior. ACTION: Notice of Public Meeting Date Change. SUMMARY: Notice is hereby given of a meeting of the Flight 93 Advisory Commission, on September 10, 2013, Flight 93 National Memorial Office, 109 West Main Street, Somerset, PA...
76 FR 4131 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the February 5, 2011, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force...
75 FR 3488 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-21
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... forth the date of the February 6, 2010 meeting of the Flight 93 Advisory Commission. DATES: The public.... (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting...
76 FR 64102 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-17
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the November 5, 2011, meeting of the Flight 93 Advisory Commission. DATES: The....m. (Eastern). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West...
75 FR 43199 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the August 7, 2010, meeting of the Flight 93 Advisory Commission. DATES: The.... (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting...
76 FR 18778 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-05
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... forth the date of the May 7, 2011, meeting of the Flight 93 Advisory Commission. DATES: The public...). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main Street Suite...
75 FR 17158 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-05
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the May 1, 2010, meeting of the Flight 93 Advisory Commission. DATES: The public...). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting will be...
77 FR 24220 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-23
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the May 5, 2012, for meeting of the Flight 93 Advisory Commission. DATES: The.... (Eastern). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main...
77 FR 3793 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the February 4, 2012, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). Location: The meeting will be held via teleconference at the Flight 93 National...
Spaceflight Operations Services Grid (SOSG)
NASA Technical Reports Server (NTRS)
Bradford, Robert N.; Thigpen, William W.
2004-01-01
In an effort to adapt existing space flight operations services to new emerging Grid technologies we are developing a Grid-based prototype space flight operations Grid. This prototype is based on the operational services being provided to the International Space Station's Payload operations located at the Marshall Space Flight Center, Alabama. The prototype services will be Grid or Web enabled and provided to four user communities through portal technology. Users will have the opportunity to assess the value and feasibility of Grid technologies to their specific areas or disciplines. In this presentation descriptions of the prototype development, User-based services, Grid-based services and status of the project will be presented. Expected benefits, findings and observations (if any) to date will also be discussed. The focus of the presentation will be on the project in general, status to date and future plans. The End-use services to be included in the prototype are voice, video, telemetry, commanding, collaboration tools and visualization among others. Security is addressed throughout the project and is being designed into the Grid technologies and standards development. The project is divided into three phases. Phase One establishes the baseline User-based services required for space flight operations listed above. Phase Two involves applying Gridlweb technologies to the User-based services and development of portals for access by users. Phase Three will allow NASA and end users to evaluate the services and determine the future of the technology as applied to space flight operational services. Although, Phase One, which includes the development of the quasi-operational User-based services of the prototype, development will be completed by March 2004, the application of Grid technologies to these services will have just begun. We will provide status of the Grid technologies to the individual User-based services. This effort will result in an extensible environment that incorporates existing and new spaceflight services into a standards-based framework providing current and future NASA programs with cost savings and new and evolvable methods to conduct science. This project will demonstrate how the use of new programming paradigms such as web and grid services can provide three significant benefits to the cost-effective delivery of spaceflight services. They will enable applications to operate more efficiently by being able to utilize pooled resources. They will also permit the reuse of common services to rapidly construct new and more powerful applications. Finally they will permit easy and secure access to services via a combination of grid and portal technology by a distributed user community consisting of NASA operations centers, scientists, the educational community and even the general population as outreach. The approach will be to deploy existing mission support applications such as the Telescience Resource Kit (TReK) and new applications under development, such as the Grid Video Distribution System (GViDS), together with existing grid applications and services such as high-performance computing and visualization services provided by NASA s Information Power Grid (IPG) in the MSFC s Payload Operations Integration Center (POIC) HOSC Annex. Once the initial applications have been moved to the grid, a process will begin to apply the new programming paradigms to integrate them where possible. For example, with GViDS, instead of viewing the Distribution service as an application that must run on a single node, the new approach is to build it such that it can be dispatched across a pool of resources in response to dynamic loads. To make this a reality, reusable services will be critical, such as a brokering service to locate appropriate resource within the pool. This brokering service can then be used by other applications such as the TReK. To expand further, if the GViDS application is constructed using a services-based mel, then other applications such as the Video Auditorium can then use GViDS as a service to easily incorporate these video streams into a collaborative conference. Finally, as these applications are re-factored into this new services-based paradigm, the construction of portals to integrate them will be a simple process. As a result, portals can be tailored to meet the requirements of specific user communities.
NASA Technical Reports Server (NTRS)
Olson, E. M.
1986-01-01
Presently, there are many difficulties associated with implementing application specific custom or semi-custom (standard cell based) integrated circuits (ICs) into JPL flight projects. One of the primary difficulties is developing prototype semi-custom integrated circuits for use and evaluation in engineering prototype flight hardware. The prototype semi-custom ICs must be extremely cost-effective and yet still representative of flight qualifiable versions of the design. A second difficulty is encountered in the transport of the design from engineering prototype quality to flight quality. Normally, flight quality integrated circuits have stringent quality standards, must be radiation resistant and should consume minimal power. It is often not necessary or cost effective, however, to impose such stringent quality standards on engineering models developed for systems analysis in controlled lab environments. This article presents work originally initiated for ground based applications that also addresses these two problems. Furthermore, this article suggests a method that has been shown successful in prototyping flight quality semi-custom ICs through the Metal Oxide Semiconductor Implementation Service (MOSIS) program run by the University of Southern California's Information Sciences Institute. The method has been used successfully to design and fabricate through the MOSIS three different semi-custom prototype CMOS p-well chips. The three designs make use of the work presented and were designed consistent with design techniques and structures that are flight qualifiable, allowing one hour transfer of the design from engineering model status to flight qualifiable foundry-ready status through methods outlined in this article.
Flight service evaluation of composite helicopter components
NASA Technical Reports Server (NTRS)
Mardoian, G. H.; Ezzo, M. B.
1986-01-01
This report presents an assessment of composite helicopter tail rotor spars and horizontal stabilizers, exposed to the effects of the environment, after up to five and a half years of commercial service. This evaluation is supported by test results of helicopter components and panels which have been exposed to outdoor environmental effects since September 1979. Full scale static and fatigue tests have been conducted on graphite/epoxy and Kevlar/epoxy composite components obtained from Sikorsky Model S-76 helicopters in commercial operations in the Gulf Coast region of Louisiana. Small scale static and fatigue tests are being conducted on coupons obtained from panels under exposure to outdoor conditions in Stratford, Connecticut and West Palm, Florida. The panel layups are representative of the S-76 components. Additionally, this report discusses the results of moisture absorption evaluations and strength tests on the S-76 components and composite panels with up to five years of outdoor exposure.
Flight service evaluation of composite helicopter components
NASA Technical Reports Server (NTRS)
Rich, M. J.; Lowry, D. W.
1985-01-01
An assessment of composite helicopter structures, exposed to environmental effects, after four years of commercial service is presented. This assessment is supported by test results of helicopter components and test panels which have been exposed to environmental effects since late 1979. Full scale static and fatigue tests are being conducted on composite components obtained from S-76 helicopters in commercial operations in the Gulf Coast region of Louisiana. Small scale tests are being conducted on coupons obtained from panels being exposed to outdoor conditions in Stratford, Connecticut and West Palm Beach, Florida. The panel layups represent S-76 components. Moisture evaluations and strength tests are being conducted, on the S-76 components and panels, over a period of eight years. Results are discussed for components and panels with up to four years of exposure.
76 FR 29335 - Qualification, Service, and Use of Crewmembers and Aircraft Dispatchers
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-20
...On January 12, 2009, the FAA published a notice of proposed rulemaking on qualification, service, and use of crewmembers and aircraft dispatchers. Because of the complexity of the issues and the concerns raised by commenters, the FAA is issuing this supplemental notice of proposed rulemaking. The FAA proposes to amend the regulations for crewmember and aircraft dispatcher training programs in domestic, flag, and supplemental operations. The proposed regulations enhance traditional training programs by requiring the use of flight simulation training devices for flightcrew members and including additional training and evaluation requirements for all crewmembers and aircraft dispatchers in areas that are critical to safety. The proposal also reorganizes and revises the qualification, training, and evaluation requirements. The proposed changes are intended to contribute significantly to reducing aviation accidents.
Airline Transport Pilot, Aircraft Dispatcher, and Flight Navigator Knowledge Test Guide
DOT National Transportation Integrated Search
1995-01-01
The Flight Standards Service of the Federal Aviation Administration (FAA) has developed this guide to help applicants meet the knowledge requirements for airline transport pilot, aircraft dispatcher, and flight navigator certification. This guide con...
Novitskiy performs in-flight maintenance on the TVIS
2013-01-23
ISS034-E-033549 (23 Jan. 2013) --- Russian cosmonaut Oleg Novitskiy, Expedition 34 flight engineer, performs routine in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Orbital Express Advanced Video Guidance Sensor: Ground Testing, Flight Results and Comparisons
NASA Technical Reports Server (NTRS)
Pinson, Robin M.; Howard, Richard T.; Heaton, Andrew F.
2008-01-01
Orbital Express (OE) was a successful mission demonstrating automated rendezvous and docking. The 2007 mission consisted of two spacecraft, the Autonomous Space Transport Robotic Operations (ASTRO) and the Next Generation Serviceable Satellite (NEXTSat) that were designed to work together and test a variety of service operations in orbit. The Advanced Video Guidance Sensor, AVGS, was included as one of the primary proximity navigation sensors on board the ASTRO. The AVGS was one of four sensors that provided relative position and attitude between the two vehicles. Marshall Space Flight Center was responsible for the AVGS software and testing (especially the extensive ground testing), flight operations support, and analyzing the flight data. This paper briefly describes the historical mission, the data taken on-orbit, the ground testing that occurred, and finally comparisons between flight data and ground test data for two different flight regimes.
Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)
1969-01-25
S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
Low-speed airspeed calibration data for a single-engine research-support aircraft
NASA Technical Reports Server (NTRS)
Holmes, B. J.
1980-01-01
A standard service airspeed system on a single engine research support airplane was calibrated by the trailing anemometer method. The effects of flaps, power, sideslip, and lag were evaluated. The factory supplied airspeed calibrations were not sufficiently accurate for high accuracy flight research applications. The trailing anemometer airspeed calibration was conducted to provide the capability to use the research support airplane to perform pace aircraft airspeed calibrations.
Flight service environmental effects on composite materials and structures
NASA Technical Reports Server (NTRS)
Dexter, H. Benson; Baker, Donald J.
1992-01-01
NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.
Air ambulance nurses as expert supplement to local emergency services.
Wisborg, Torben; Bjerkan, Bjørn
2014-01-01
Flight nurses in the Norwegian National Air Ambulance Service are specialist nurse anesthetists or intensive care nursing specialists. For air ambulance bases far from hospitals, these nurses present otherwise unavailable competencies. This study reports a 6-year experience with flight nurse participation in local emergencies beyond the transportation phase. The fixed-wing air ambulance base in Alta, Northern Norway (20,000 inhabitants), with 2 aircraft and 2 on-call teams is 150 km by road from the nearest hospital. We did a prospective registration of all emergency nonflight missions near the air ambulance base from January 1, 2005, to December 31, 2010. The 217 completed missions corresponded to 3 missions per month, half during daytime. Twenty-three percent of patients were under age 18, injury rate was high (36%), 63% had potentially or manifest life-threatening conditions, and 11% died during treatment. One third of all missions (67/217) resulted in an air ambulance flight to the hospital. Mission frequency did not significantly reduce flight availability, and precision in case selection for this special service was good. The use of flight nurses in the local community promotes equal access to advanced medical services for populations far from hospitals. Copyright © 2014 Air Medical Journal Associates. Published by Elsevier Inc. All rights reserved.
77 FR 37709 - Notice of July 28, 2012, Meeting for Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
..., 2012, Meeting for Flight 93 National Memorial Advisory Commission AGENCY: National Park Service... the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be held... held at the Flight 93 National Memorial Office, 109 West Main Street Suite 104, Somerset, PA 15501...
78 FR 6129 - Notice of Flight 93 Advisory Commission Meetings for Calendar Year 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-29
... Flight 93 Advisory Commission Meetings for Calendar Year 2013 AGENCY: National Park Service, Interior... November 2, 2013, meetings of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory...). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main Street, Suite...
14 CFR 398.7 - Timing of flights.
Code of Federal Regulations, 2012 CFR
2012-01-01
... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...
14 CFR 398.7 - Timing of flights.
Code of Federal Regulations, 2010 CFR
2010-01-01
... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...
14 CFR 398.7 - Timing of flights.
Code of Federal Regulations, 2011 CFR
2011-01-01
... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...
14 CFR § 1214.104 - Reimbursement for optional services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government... will be escalated in accordance with the provisions of § 1214.103(d). (c) Schedules of payments. NASA... launch agreement at the time a particular optional service is agreed to between the customer and NASA. (d...
Williams with TVIS hardware in Zvezda Service module
2007-02-27
ISS014-E-15349 (27 Feb. 2007) --- Assisted by the weightlessness of space, astronaut Sunita L. Williams, Expedition 14 flight engineer, hoists the Treadmill Vibration Isolation System (TVIS). She took a moment to pose for a photo during routine in-flight maintenance (IFM) on TVIS in the Zvezda Service Module of the International Space Station.
47 CFR 87.189 - Requirements for public correspondence equipment and operations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Aircraft Stations § 87.189 Requirements for... continuous watch must be maintained on the frequencies used for safety and regularity of flight while public... interfere with message pertaining to safety of life and property or regularity of flight, or when ordered by...
Tyurin and Voss perform maintenance on the TVIS treadmill in the Service Module
2001-08-19
ISS003-E-5200 (19 August 2001) --- Cosmonaut Mikhail Tyurin (left), Expedition Three flight engineer representing Rosaviakosmos, and astronaut James S. Voss, Expedition Two flight engineer, perform maintenance in the Zvezda Service Module on the International Space Station (ISS). This image was taken with a digital still camera.
Voss with soldering tool in Service Module
2001-03-28
ISS002-E-5068 (28 March 2001) --- Astronaut James S. Voss, Expedition Two flight engineer, prepares to use a soldering tool for a maintenance task in the Zvezda Service Module onboard the International Space Station (ISS). Astronaut Susan J. Helms, flight engineer, is in the background. The image was recorded with a digital still camera.
Code of Federal Regulations, 2010 CFR
2010-10-01
... stations on a noninterference basis at airports which have a part-time control tower, part-time RCO or part-time FAA flight service station and a unicom. (c) At airports which have a unicom but no control tower... described in subpart G of this part. (d) At airports which have no control tower, RCO, flight service...
A Low Cost GPS System for Real-Time Tracking of Sounding Rockets
NASA Technical Reports Server (NTRS)
Markgraf, M.; Montenbruck, O.; Hassenpflug, F.; Turner, P.; Bull, B.; Bauer, Frank (Technical Monitor)
2001-01-01
This paper describes the development as well as the on-ground and the in-flight evaluation of a low cost Global Positioning System (GPS) system for real-time tracking of sounding rockets. The flight unit comprises a modified ORION GPS receiver and a newly designed switchable antenna system composed of a helical antenna in the rocket tip and a dual-blade antenna combination attached to the body of the service module. Aside from the flight hardware a PC based terminal program has been developed to monitor the GPS data and graphically displays the rocket's path during the flight. In addition an Instantaneous Impact Point (IIP) prediction is performed based on the received position and velocity information. In preparation for ESA's Maxus-4 mission, a sounding rocket test flight was carried out at Esrange, Kiruna, on 19 Feb. 2001 to validate existing ground facilities and range safety installations. Due to the absence of a dedicated scientific payload, the flight offered the opportunity to test multiple GPS receivers and assess their performance for the tracking of sounding rockets. In addition to the ORION receiver, an Ashtech G12 HDMA receiver and a BAE (Canadian Marconi) Allstar receiver, both connected to a wrap-around antenna, have been flown on the same rocket as part of an independent experiment provided by the Goddard Space Flight Center. This allows an in-depth verification and trade-off of different receiver and antenna concepts.
Hubble Space Telescope Fine Guidance Sensor Post-Flight Bearing Inspection
NASA Technical Reports Server (NTRS)
Pellicciotti, J.; Loewenthal, S.; Jones, W., Jr.; Jumper, M.
2004-01-01
Aerospace mechanism engineering success stories often, if not always, consist of overcoming developmental, test and flight anomalies. Many times it is these anomalies that stimulate technology growth and more reliable future systems. However, one must learn from these to achieve an ultimately successful mission. It is not often that a spacecraft engineer is able to inspect hardware that has flown in orbit for several years. However, in February 1997, the Fine Guidance Sensor-1 (FGS-1) was removed from the Hubble Space Telescope (HST) and returned to NASA Goddard Space Flight Center (GSFC) during the second Servicing Mission (SM2). At the time of removal, FGS-1 had nearly 7 years of service and the bearings in the Star Selector Servos (SSS) had accumulated approximately 25 million Coarse Track (CT) cycles. The main reason for its replacement was due to a bearing torque anomaly leading to stalling of the B Star Selector Servo (SSS-B) when reversing direction during a vehicle offset maneuver, referred to herein as a Reversal Bump (RB). The returned HST FGS SSS bearings were disassembled for post-service condition assessment to better understand the actual cause of the torque spikes, identify potential process/design improvements, and provide information for remedial on-orbit operation modifications. The methods and technology utilized for this inspection are not unique to this system and can be adapted to most investigations at varying stages of the mechanism life from development, through testing, to post flight evaluation. The systematic methods used for the HST Fine Guidance Sensor (FGS) SSS and specific findings are the subjects presented in this paper. The lessons learned include the importance of cleanliness and handling for precision instrument bearings and the potential effects from contamination. The paper describes in detail, the analytical techniques used for the SSS and their importance in this investigation. Inspection analytical data and photographs are included throughout the paper.
75 FR 65029 - Flight 93 National Memorial Advisory Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the November 13, 2010, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). The [[Page 65030
14 CFR 91.501 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...
14 CFR 91.501 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...
14 CFR 91.501 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...
14 CFR 91.501 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...
14 CFR 91.501 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...
Distributing flight dynamics products via the World Wide Web
NASA Technical Reports Server (NTRS)
Woodard, Mark; Matusow, David
1996-01-01
The NASA Flight Dynamics Products Center (FDPC), which make available selected operations products via the World Wide Web, is reported on. The FDPC can be accessed from any host machine connected to the Internet. It is a multi-mission service which provides Internet users with unrestricted access to the following standard products: antenna contact predictions; ground tracks; orbit ephemerides; mean and osculating orbital elements; earth sensor sun and moon interference predictions; space flight tracking data network summaries; and Shuttle transport system predictions. Several scientific data bases are available through the service.
Code of Federal Regulations, 2013 CFR
2013-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Code of Federal Regulations, 2012 CFR
2012-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Code of Federal Regulations, 2014 CFR
2014-01-01
... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...
Usability of EFBs for Viewing NOTAMs and AIS/MET Data Link Messages
NASA Technical Reports Server (NTRS)
Evans, Emory T.; Young, Steven D.; Daniels, Tammi S.; Myer, Robert R.
2014-01-01
Electronic Flight Bags (EFB) are increasingly integral to flight deck information management. A piloted simulation study was conducted at NASA Langley Research Center, one aspect of which was to evaluate the usability and acceptability of EFBs for viewing and managing Notices to Airmen (NOTAMs) and data linked aeronautical information services (AIS) and meteorological information (MET). The study simulated approaches and landings at Memphis International Airport (KMEM) using various flight scenarios and weather conditions. Ten two-pilot commercial airline crews participated, utilizing the Cockpit Motion Facility's Research Flight Deck (CMF/RFD) simulator. Each crew completed approximately two dozen flights over a two day period. Two EFBs were installed, one for each pilot. Study data were collected in the form of questionnaire/interview responses, audio/video recordings, oculometer recordings, and aircraft/system state data. Preliminary usability results are reported primarily based on pilot interviews and responses to questions focused on ease of learning, ease of use, usefulness, satisfaction, and acceptability. Analysis of the data from the other objective measures (e.g., oculometer) is ongoing and will be reported in a future publication. This paper covers how the EFB functionality was set up for the study; the NOTAM, AIS/MET data link, and weather messages that were presented; questionnaire results; selected pilot observations; and conclusions.
Forecast of space shuttle flight requirements for launch of commercial communications satellites
NASA Technical Reports Server (NTRS)
1977-01-01
The number of communication satellites required over the next 25 years to support domestic and regional communication systems for telephony, telegraphy and other low speed data; video teleconferencing, new data services, direct TV broadcasting; INTELSAT; and maritime and aeronautical services was estimated to determine the number of space shuttle flights necessary for orbital launching.
Manpower Requirements for Air Traffic Control and Flight Service Specialists in Indiana.
ERIC Educational Resources Information Center
Purdue Univ., Lafayette, IN. Office of Manpower Studies.
As of January 1, 1968 the Federal Aviation Administration (FAA) of the United States Department of Transportation employed 6,963 controllers in airport towers, 7,617 controllers in Air Route Traffic Control Centers, and 4,459 flight service specialists at airport locations. Projected needs are as follows: (1) Controllers in airport towers:…
GSFC contamination monitors for Space Station
NASA Technical Reports Server (NTRS)
Carosso, P. A.; Tveekrem, J. L.; Coopersmith, J. D.
1988-01-01
This paper describes the Work Package 3 activities in the area of neutral contamination monitoring for the Space Station. Goddard Space Flight Center's responsibilities include the development of the Attached Payload Accommodations Equipment (APAE), the Polar Orbiting Platform (POP), and the Flight Telerobotic Servicer (FTS). GSFC will also develop the Customer Servicing Facility (CSF) in Phase 2 of the Space Station.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... approve AMOCs for this AD. Use the procedures found in 14 CFR 39.19 to make your request. (2) AMOCs... turbochargers from service before further flight. This AD also requires removing certain HET turbochargers from service before further flight. This AD was prompted by a report that an additional engine, the CMI LTSIO...
NASA Technical Reports Server (NTRS)
Blake, Jean A.
1987-01-01
Spacelink is an electronic information service to be operated by the Marshall Space Flight Center. It will provide NASA news and educational resources including software programs that can be accessed by anyone with a computer and modem. Spacelink is currently being installed and will soon begin service. It will provide daily updates of NASA programs, information about NASA educational services, manned space flight, unmanned space flight, aeronautics, NASA itself, lesson plans and activities, and space program spinoffs. Lesson plans and activities were extracted from existing NASA publications on aerospace activities for the elementary school. These materials were arranged into 206 documents which have been entered into the Spacelink program for use in grades K-6.
NASA Technical Reports Server (NTRS)
Baker, Donald J.
1989-01-01
Part of the results of a U.S. Army/NASA-Langley sponsored research program to establish the long term-term effects of realistic ground based exposure on advanced composite materials is presented. Residual strengths and moisture absorption as a function of exposure time and exposure location are reported for four different composite material systems that were exposed for five years on the North American Continent.
Experimental Evaluation of the Flight Line Food Service Facility at Travis AFB
1974-06-01
8217emm^^mmi - TABLE 1 DINNER MENU SOUPS DAILY Chili Con Came, Chicken Noodle Soup, Vegetable Soup, Cream of Tomato Soup MON - Vegetable-Beef...Soup TUE - Cream of Chicken Soup WED - Minestrone Soup THU - Beef Noodle Soup FRI - Clam Chowder SAT - Chicken Rice Soup SUN...within two days; frozen sandwiches and breakfast meals would be manufactured once a week and dinner meals every two weeks. During the experiment
2005-08-12
Todd Viddle; APU advanced systems technician, Robert 'Skip' Garrett; main propulsion advanced systems technician, and Dan McGrath; main propulsion systems engineer technician, remove a servicing unit from the Space Shuttle Discovery as part of it's post-flight processing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items
NASA Technical Reports Server (NTRS)
1997-01-01
The Space Shuttle Discovery cuts a bright swath through the early-morning darkness as it lifts off from Launch Pad 39A on a scheduled 10-day flight to service the Hubble Space Telescope (HST). Liftoff of Mission STS-82 occurred on-time at 3:55:17 a.m. EST, Feb. 11, 1997. Leading the veteran crew is Mission Commander Kenneth D. Bowersox. Scott J. 'Doc' Horowitz is the pilot. Mark C. Lee is the payload commander. Rounding out the seven-member crew are Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. 'Joe' Tanner and Steven A. Hawley. Four of the astronauts will be divided into two teams to perform the scheduled four back-to-back extravehicular activities (EVAs) or spacewalks. Lee and Smith will team up for EVAs 1 and 3 on flight days 4 and 6; Harbaugh and Tanner will perform EVAs 2 and 4 on flight days 5 and 7. Among the tasks will be to replace two outdated scientific instruments with two new instruments the Space Telescope Imaging Spectrograph (STIS) and the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). This is the second servicing mission for HST, which was originally deployed in 1990 and designed to be serviced on-orbit about every three years. Hubble was first serviced in 1993. STS-82 is the second of eight planned flights in 1997. It is the 22nd flight of Discovery and the 82nd Shuttle mission.
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a Lockheed Martin technician monitors the progress as a crane is used to lift the Orion service module from a test stand and move it to the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, prior to rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin engineers and technicians monitor the progress as a crane is used to move the Orion service module to the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin engineers and technicians monitor the progress as a crane is used to move the Orion service module to the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
2014-06-06
CAPE CANAVERAL, Fla. -- Inside the Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, NASA and Lockheed Martin technicians and engineers monitor the progress as a crane is used to lift the Orion service module from a test stand and move it to the Final Assembly and System Testing, or FAST, cell further down the aisle. The Orion crew module will be stacked on the service module in the FAST cell and then both modules will be put through their final system tests for Exploration Flight Test-1, or EFT-1, before rolling out of the facility for integration with the United Launch Alliance Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of Orion, EFT-1, is scheduled to launch later this year atop a Delta IV rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Glenn Benson
CCSDS Mission Operations Action Service Core Capabilities
NASA Technical Reports Server (NTRS)
Reynolds, Walter F.; Lucord, Steven A.; Stevens, John E.
2009-01-01
This slide presentation reviews the operations concepts of the command (action) services. Since the consequences of sending the wrong command are unacceptable, the command system provides a collaborative and distributed work environment for flight controllers and operators. The system prescribes a review and approval process where each command is viewed by other individuals before being sent to the vehicle. The action service needs additional capabilities to support he operations concepts of manned space flight. These are : (1) Action Service methods (2) Action attributes (3) Action parameter/argument attributes (4 ) Support for dynamically maintained action data. (5) Publish subscri be capabilities.
NASA Astrophysics Data System (ADS)
Beal, Roger Zack
The current fiscally austere environment prevalent in the military and industry is driving extreme measures to save money. In the United States Air Force, this has driven enormous efforts to trim sustainment spending on extended life aircraft. The challenge to the aerospace engineer is to ensure flight safety in the midst of this economic pressure. One method of cutting costs is to increase the time an aircraft is in service by delaying the point when the aircraft is taken out of service for depot maintenance. To ensure flight safety, in depth fatigue and fracture analysis needs to be accomplished to assess increasing the inspection interval. The purpose of this study was to determine the sensitivity of Aluminum 2024-T351 alloy, a common material used in tension dominated aerospace applications, to two different loading spectra---one that is aggressive and the other that is benign. This was accomplished by conducting five different combinations of the two spectra, developing computer simulations using the AFGROW software and comparing with the measured data. The results showed that the material demonstrated significantly different behavior between the two spectra. These results provide a valuable tool for the aerospace engineer for fatigue life prediction and inspection interval evaluation.
Optimizing Air Transportation Service to Metroplex Airports. Part 1; Analysis of Historical Data
NASA Technical Reports Server (NTRS)
Donohue, George; Hoffman, Karla; Sherry, Lance; Ferguson, John; Kara, Abdul Qadar
2010-01-01
The air transportation system is a significant driver of the U.S. economy, providing safe, affordable, and rapid transportation. During the past three decades airspace and airport capacity has not grown in step with demand for air transportation (+4% annual growth), resulting in unreliable service and systemic delays. Estimates of the impact of delays and unreliable air transportation service on the economy range from $32B to $41B per year. This report describes the results of an analysis of airline strategic decision-making with regards to: (1) geographic access, (2) economic access, and (3) airline finances. This analysis evaluated markets-served, scheduled flights, aircraft size, airfares, and profit from 2005-2009. During this period, airlines experienced changes in costs of operation (due to fluctuations in hedged fuel prices), changes in travel demand (due to changes in the economy), and changes in infrastructure capacity (due to the capacity limits at EWR, JFK, and LGA). This analysis captures the impact of the implementation of capacity limits at airports, as well as the effect of increased costs of operation (i.e. hedged fuel prices). The increases in costs of operation serve as a proxy for increased costs per flight that might occur if auctions or congestion pricing are imposed.
Modeling and analysis of selected space station communications and tracking subsystems
NASA Technical Reports Server (NTRS)
Richmond, Elmer Raydean
1993-01-01
The Communications and Tracking System on board Space Station Freedom (SSF) provides space-to-ground, space-to-space, audio, and video communications, as well as tracking data reception and processing services. Each major category of service is provided by a communications subsystem which is controlled and monitored by software. Among these subsystems, the Assembly/Contingency Subsystem (ACS) and the Space-to-Ground Subsystem (SGS) provide communications with the ground via the Tracking and Data Relay Satellite (TDRS) System. The ACS is effectively SSF's command link, while the SGS is primarily intended as the data link for SSF payloads. The research activities of this project focused on the ACS and SGS antenna management algorithms identified in the Flight System Software Requirements (FSSR) documentation, including: (1) software modeling and evaluation of antenna management (positioning) algorithms; and (2) analysis and investigation of selected variables and parameters of these antenna management algorithms i.e., descriptions and definitions of ranges, scopes, and dimensions. In a related activity, to assist those responsible for monitoring the development of this flight system software, a brief summary of software metrics concepts, terms, measures, and uses was prepared.
Digital Electronic Engine Control (DEEC) Flight Evaluation in an F-15 Airplane
NASA Technical Reports Server (NTRS)
1984-01-01
Flight evaluation in an F-15 aircraft by digital electronic engine control (DEEC) was investigated. Topics discussed include: system description, F100 engine tests, effects of inlet distortion on static pressure probe, flight tests, digital electronic engine control fault detection and accommodation flight evaluation, flight evaluation of a hydromechanical backup control, augmentor transient capability of an F100 engine, investigation of nozzle instability, real time in flight thrust calculation, and control technology for future aircraft propulsion systems. It is shown that the DEEC system is a powerful and flexible controller for the F100 engine.
International Space Station Bacteria Filter Element Service Life Evaluation
NASA Technical Reports Server (NTRS)
Perry, J. L.
2005-01-01
The International Space Station (ISS) uses high-efficiency particulate air filters to remove particulate matter from the cabin atmosphere. Known as bacteria filter elements (BFEs), there are 13 elements deployed on board the ISS's U.S. segment in the flight 4R assembly level. The preflight service life prediction of 1 yr for the BFEs is based upon engineering analysis of data collected during developmental testing that used a synthetic dust challenge. While this challenge is considered reasonable and conservative from a design perspective, an understanding of the actual filter loading is required to best manage the critical ISS program resources. Testing was conducted on BFEs returned from the ISS to refine the service life prediction. Results from this testing and implications to ISS resource management are provided.
Flight test and evaluation of Omega navigation in a general aviation aircraft. Volume 2: Appendices
NASA Technical Reports Server (NTRS)
Howell, J. D.; Hoffman, W. C.; Hwoschinsky, P. V.; Wischmeyer, C. E.
1975-01-01
Detailed documentation for each flight of the Omega Flight Evaluation study is presented, including flight test description sheets and actual flight data plots. Computer programs used for data processing and flight planning are explained and the data formats utilized by the Custom Interface Unit are summarized.
Haignere works in the Service Module during Expedition Three
2001-10-23
ISS003-E-6855 (23-31 October 2001) --- French Flight Engineer Claudie Haignere, works in the Zvezda Service Module on the International Space Station (ISS). Haignere represents ESA, carrying out a flight program for CNES, the French Space Agency, under a commercial contract with the Russian Aviation and Space Agency. This image was taken with a digital still camera.
Design concept definition study for an improved shuttle waste collection subsystem
NASA Technical Reports Server (NTRS)
1984-01-01
A no-risk approach for developing an Improved Waste Collection Subsystem (WCS) for the shuttle orbiter is described. The GE Improved WCS Concept builds on the experience of 14 Shuttle missions with over 400 man-days of service. This concept employs the methods of the existing flight-proven mature design, augmenting them to eliminate foreseen difficulties and to fully comply with the design requirements. The GE Improved WCS Concept includes separate storage for used wipes. Compaction of the wipes provides a solution to the capacity problem, fully satisfying the 210 man-day storage requirement. The added feature of in-flight serviceable storage space for the wipes creates a variable capacity feature which affords redundancy in the event of wipes compaction system failure. Addition of features permitting in-flight servicing of the feces storage tank creates a variable capacity WCS with easier post-flight servicing to support rapid turnaround of the Shuttle orbiter. When these features are combined with a vacuum pump to evacuate wipes and fecal storage tanks through replaceable odor/bacteria filters to the cabin, the GE Improved WCS satisfies the known requirements for Space Station use, including no venting to space.
Dexterous Orbital Servicing System (DOSS)
NASA Technical Reports Server (NTRS)
Price, Charles R.; Berka, Reginald B.; Chladek, John T.
1994-01-01
The Dexterous Orbiter Servicing System (DOSS) is a dexterous robotic spaceflight system that is based on the manipulator designed as part of the Flight Telerobotics Servicer program for the Space Station Freedom and built during a 'technology capture' effort that was commissioned when the FTS was cancelled from the Space Station Freedom program. The FTS technology capture effort yielded one flight manipulator and the 1 g hydraulic simulator that had been designed as an integrated test tool and crew trainer. The DOSS concept was developed to satisfy needs of the telerobotics research community, the space shuttle, and the space station. As a flight testbed, DOSS would serve as a baseline reference for testing the performance of advanced telerobotics and intelligent robotics components. For shuttle, the DOSS, configured as a movable dexterous tool, would be used to provide operational flexibility for payload operations and contingency operations. As a risk mitigation flight demonstration, the DOSS would serve the International Space Station to characterize the end to end system performance of the Special Purpose Dexterous Manipulator performing assembly and maintenance tasks with actual ISSA orbital replacement units. Currently, the most likely entrance of the DOSS into spaceflight is a risk mitigation flight experiment for the International Space Station.
NASA Technical Reports Server (NTRS)
Barhydt, Richard; Palmer, Michael T.; Eischeid, Todd M.
2004-01-01
NASA Langley Research Center is developing an Autonomous Operations Planner (AOP) that functions as an Airborne Separation Assurance System for autonomous flight operations. This development effort supports NASA s Distributed Air-Ground Traffic Management (DAG-TM) operational concept, designed to significantly increase capacity of the national airspace system, while maintaining safety. Autonomous aircraft pilots use the AOP to maintain traffic separation from other autonomous aircraft and managed aircraft flying under today's Instrument Flight Rules, while maintaining traffic flow management constraints assigned by Air Traffic Service Providers. AOP is designed to facilitate eventual implementation through careful modeling of its operational environment, interfaces with other aircraft systems and data links, and conformance with established flight deck conventions and human factors guidelines. AOP uses currently available or anticipated data exchanged over modeled Arinc 429 data buses and an Automatic Dependent Surveillance Broadcast 1090 MHz link. It provides pilots with conflict detection, prevention, and resolution functions and works with the Flight Management System to maintain assigned traffic flow management constraints. The AOP design has been enhanced over the course of several experiments conducted at NASA Langley and is being prepared for an upcoming Joint Air/Ground Simulation with NASA Ames Research Center.
2014-09-11
CAPE CANAVERAL, Fla. – Preparations are underway at the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida for the move of the Orion spacecraft for Exploration Flight Test-1 out of the high bay doors. Inside the high bay from left, are Jules Schneider, Lockheed Martin senior manager, and Kennedy Center Director Bob Cabana. The spacecraft will be transported to the Payload Hazardous Servicing Facility where it will be fueled ahead of its December flight test. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch atop a United Launch Alliance Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Daniel Casper
14 CFR 1214.205 - Revisit and/or retrieval services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...
14 CFR 1214.205 - Revisit and/or retrieval services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...
14 CFR 1214.205 - Revisit and/or retrieval services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...
Combining control input with flight path data to evaluate pilot performance in transport aircraft.
Ebbatson, Matt; Harris, Don; Huddlestone, John; Sears, Rodney
2008-11-01
When deriving an objective assessment of piloting performance from flight data records, it is common to employ metrics which purely evaluate errors in flight path parameters. The adequacy of pilot performance is evaluated from the flight path of the aircraft. However, in large jet transport aircraft these measures may be insensitive and require supplementing with frequency-based measures of control input parameters. Flight path and control input data were collected from pilots undertaking a jet transport aircraft conversion course during a series of symmetric and asymmetric approaches in a flight simulator. The flight path data were analyzed for deviations around the optimum flight path while flying an instrument landing approach. Manipulation of the flight controls was subject to analysis using a series of power spectral density measures. The flight path metrics showed no significant differences in performance between the symmetric and asymmetric approaches. However, control input frequency domain measures revealed that the pilots employed highly different control strategies in the pitch and yaw axes. The results demonstrate that to evaluate pilot performance fully in large aircraft, it is necessary to employ performance metrics targeted at both the outer control loop (flight path) and the inner control loop (flight control) parameters in parallel, evaluating both the product and process of a pilot's performance.
Telepresence work station system definition study, part 2
NASA Technical Reports Server (NTRS)
1987-01-01
This study effort has shown that the development of a space robotic servicing system is totally feasible. More importantly, many of the key elements of such a system are currently available as the result of previous and ongoing technical efforts. In many cases, decisions remain to be made concerning tradeoffs between options available to satisfy system technology requirements. The primary recommendation resulting from this study is for the development of a flight test bed system that could be used to establish a performance database to assist some of the necessary technical decisions described in the study package. A properly design flight test bed system would prove tremendously useful in terms of rapidly evaluating technology in a realistic setting and would be a great benefit in the development of the operational system.
Analysis of passenger acceptance of commercial flights having characteristics similar to STOL
NASA Technical Reports Server (NTRS)
Kuhlthau, A. R.; Jacobson, I. D.
1973-01-01
Previous work in the development of quantitative models for the prediction of passenger reaction to motion and vehicle environment parameters in flight was extended to include a class of aircraft appropriate for low-density, short-haul service. The results indicate that it is possible to obtain quantitative response inputs from an usually small special test-subject group which will be representative of the general traveling public. Additional data which indicate the importance of comfort as a factor in evaluating ride quality was obtained, and identification of the factors which contribute to judgments regarding comfort level was improved. Seat comfort and seat spacing is very vital in the smaller aircraft. Mathematical modeling applied in conjuction with passenger reaction data was shown to be very useful for establishing ride-quality design criteria.
NASA Technical Reports Server (NTRS)
Smith, Jeffrey H.; Gyamfi, Max A.; Volkmer, Kent; Zimmerman, Wayne F.
1987-01-01
A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.
Legacy of Operational Space Medicine During the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Stepaniakm, P.; Gilmore, S.; Johnston, S.; Chandler, M.; Beven, G.
2011-01-01
The Johnson Space Center s Medical Science Division branches were involved in preparing astronauts for space flight during the 30 year period of the Space Shuttle Program. These branches included the Flight Medicine Clinic, Medical Operations and the Behavioral Health Program. The components of each facet of these support services were: the Flight Medicine Clinic s medical selection process and medical care; the Medical Operations equipment, training, procedures and emergency medical services; and the Behavioral Health and Performance operations. Each presenter will discuss the evolution of its operations, implementations, lessons learned and recommendations for future vehicles and short duration space missions.
Autonomous Navigation With Ground Station One-Way Forward-Link Doppler Data
NASA Technical Reports Server (NTRS)
Horstkamp, G. M.; Niklewski, D. J.; Gramling, C. J.
1996-01-01
The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational onboard navigation systems (ONS's) to provide real time autonomous, highly accurate navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet (EP/EUV) spacecraft, launched on June 7, 1992, flight demonstrated the ONS for high accuracy navigation using TDRSS forward link communication services. In late 1994, a similar ONS experiment was performed using EP/EUV flight hardware (the ultrastable oscillator and Doppler extractor card in one of the TDRSS transponders) and ground system software to demonstrate the feasibility of using an ONS with ground station forward link communication services. This paper provides a detailed evaluation of ground station-based ONS performance of data collected over a 20 day period. The ground station ONS (GONS) experiment results are used to project the expected performance of an operational system. The GONS processes Doppler data derived from scheduled ground station forward link services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. Analysis of the GONS experiment performance indicates that real time onboard position accuracies of better than 125 meters (1 sigma) are achievable with two or more 5-minute contacts per day for the EP/EUV 525 kilometer altitude, 28.5 degree inclination orbit. GONS accuracy is shown to be a function of the fidelity of the onboard propagation model, the frequency/geometry of the tracking contacts, and the quality of the tracking measurements. GONS provides a viable option for using autonomous navigation to reduce operational costs for upcoming spacecraft missions with moderate position accuracy requirements.
Structural Area Inspection Frequency Evaluation (SAIFE). Volume 5. Results of Model Demonstration
1978-04-01
serlV ice 11 i Stot’)’ .i ’ base~d Otil narrow -bodly at ir-c t’a ftA wh ich have fewer 0 1 euient~s than thle hypothet i cal widve - A body aircaf...kP1 c u TABLE 14. DL40MRATION RESULTS .M WING - SPAR, FMD Defects Per Million Flight Hours Crack Detected Preflight 0.00 0104 Service 0.00 0.49 Phase
Business Case Analysis of the Towed Gilder Air Launched System (TGALS)
NASA Technical Reports Server (NTRS)
Webb, Darryl W.; Nguyen, McLinton B.; Seibold, Robert W.; Wong, Frank C.; Budd, Gerald D.
2017-01-01
The Aerospace Corporation developed an integrated Business Case Analysis (BCA) model on behalf of the NASA Armstrong Flight Research Center (AFRC). This model evaluated the potential profitability of the Towed Glider Air Launched System (TGALS) concept, under development at AFRC, identifying potential technical, programmatic, and business decisions that could improve its business viability. The model addressed system performance metrics; development, production and operation cost estimates; market size and product service positioning; pricing alternatives; and market share.
Future aircraft networks and schedules
NASA Astrophysics Data System (ADS)
Shu, Yan
2011-07-01
Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents computational results of these large-scale instances. To validate the models and solution algorithms developed, this thesis also compares the daily flight schedules that it designs with the schedules of the existing airlines. Furthermore, it creates instances that represent different economic and fuel-prices conditions and derives schedules under these different conditions. In addition, it discusses the implication of using new aircraft in the future flight schedules. Finally, future research in three areas---model, computational method, and simulation for validation---is proposed.
14 CFR § 1214.108 - Termination.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214... standard services to NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle standard flight price and will be based on the table below. Months before scheduled...
Chiao performs in-flight maintenance on the TVIS in the SM during Expedition 10
2005-02-15
ISS010-E-17815 (15 February 2005) --- Cosmonaut Salizhan S. Sharipov, Expedition 10 flight engineer representing Russia's Federal Space Agency, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station (ISS).
NASA Technical Reports Server (NTRS)
Booker, Mattie
1992-01-01
The Flight Dynamics Facility (FDF) of the Flight Dynamics Division (FDD), of the Goddard Space Flight Center provides acquisition data to tracking stations and orbit and attitude services to scientists and mission support personnel. The following paper explains how a method was determined that found spacecraft entry and exit times of the aurora zone.
14 CFR 10 - Functional Classification-Operating Expenses of Group I Air Carriers
Code of Federal Regulations, 2012 CFR
2012-01-01
... shall include expenses incurred directly in the in-flight operation of aircraft and expenses attaching...-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing... aircraft or aircraft operational personnel for flight assignment. Such expenses shall be included in...
Flight Instructor: Airplane. Written Test Guide.
ERIC Educational Resources Information Center
Federal Aviation Administration (DOT), Washington, DC. Flight Standards Service.
The Flight Standards Service of the Federal Aviation Administration developed the guide to assist applicants who are preparing for the Flight Instructor Certificate with Airplane Rating. The guide contains comprehensive study outlines and a list of recommended study materials and tells how to obtain those publications. It also includes sample test…
75 FR 79437 - Notification of Proposed Delegation Programs and Request for Comment
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-20
... programs. Knowledge Testing ODAs would be appointed and managed by The Flight Standards Airman Testing... CFR part 133. Air Operator ODAs would be appointed and managed by the geographic Flight Standards District Office under the authority of the Director, Flight Standards Service. The FAA anticipates granting...
NASA Astrophysics Data System (ADS)
Horton, Peter; Moore, Peter
This year marks the twentieth anniversary of the introduction of Concorde into commercial airline service. The first commercial flights were on 21 January 1976 - British Airways from Heathrow to Bahrain and Air France from Paris to Rio via Dakar. Later in that year commercial flights to Washington/Dulles began on 24 May. Services to New York were delayed until 22 November 1977. The first flight of Concorde was some seven years earlier. The prototype took off out of Toulouse on 2 March 1969 and this was followed by 002 from Filton to Fairford on 9 April. At the time it was anticipated that this was the beginning of an era when supersonic flight would be the normal way to travel long distances. Now, in 1996, Concorde is still the world's only supersonic commercial passenger airliner in airline service. This is an extraordinary achievement. The Boeing SST proved to be too ambitious and the programme was halted in 1971 after the United States Government withdrew support, while the Russian TU 144 was beset with problems. One TU 144 crashed at the Paris Air Show in 1973. The aircraft entered internal airline service in December 1975, flying supersonically between Moscow and Alma-Ata, capital of Kazakhstan, carrying mail and freight, but it did not have the range to operate viable intercontinental passenger serives. Certainly by 1985, if not many years before, the TU 144 was out of service.
Hygienic support of the ISS air quality (main achievements and prospects)
NASA Astrophysics Data System (ADS)
Moukhamedieva, Lana; Tsarkov, Dmitriy; Pakhomova, Anna
Hygienic preventive measures during pre-flight processing of manned spaceships, selection of polymeric materials, sanitary-hygienic evaluation of cargo and scientific hardware to be used on the ISS and life support systems allow to maintain air quality in limits of regulatory requirements. However, graduate increase of total air contamination by harmful chemicals is observed as service life of the ISS gets longer. It is caused by polymeric materials used on the station overall quantity rise, by additional contamination brought by cargo spacecrafts and modules docking to the ISS and by the cargo. At the same time the range of contaminants that are typical for off-gassing from polymeric materials where modern stabilizers, plasticizers, flame retarders and other additives are used gets wider. In resolving the matters of the ISS service life extension the main question of hygienic researches is to determine real safe operation life of the polymeric material used in structures and hardware of the station, including: begin{itemize} research of polymers degradation (ageing) and its effect on intensity of off gassing and its toxicity; begin{itemize} introduction of polymers with minimal volatile organic compounds off gassing under conditions of space flight and thermal-oxidative degradation. In order to ensure human safety during long-term flight it is important to develop: begin{itemize} real-time air quality monitoring systems, including on-line analysis of highly toxic contaminants evolving during thermo-oxidative degradation of polymer materials and during blowouts of toxic contaminants; begin{itemize} hygienic standards of contaminants level for extended duration of flight up to 3 years. It is essential to develop an automated control system for on-line monitoring of toxicological status and to develop hygienic and engineer measures of its management in order to ensure crew members safety during off-nominal situation.
NASA Technical Reports Server (NTRS)
Ely, Jay J.
2005-01-01
Electromagnetic interference (EMI) promises to be an ever-evolving concern for flight electronic systems. This paper introduces EMI and identifies its impact upon civil aviation radio systems. New wireless services, like mobile phones, text messaging, email, web browsing, radio frequency identification (RFID), and mobile audio/video services are now being introduced into passenger airplanes. FCC and FAA rules governing the use of mobile phones and other portable electronic devices (PEDs) on board airplanes are presented along with a perspective of how these rules are now being rewritten to better facilitate in-flight wireless services. This paper provides a comprehensive overview of NASA cooperative research with the FAA, RTCA, airlines and universities to obtain laboratory radiated emission data for numerous PED types, aircraft radio frequency (RF) coupling measurements, estimated aircraft radio interference thresholds, and direct-effects EMI testing. These elements are combined together to provide high-confidence answers regarding the EMI potential of new wireless products being used on passenger airplanes. This paper presents a vision for harmonizing new wireless services with aeronautical radio services by detecting, assessing, controlling and mitigating the effects of EMI.
Command and Service Module Communications
NASA Technical Reports Server (NTRS)
Interbartolo, Michael
2009-01-01
This viewgraph presentation examines Command and Service Module (CSM) Communications. The communication system's capabilities are defined, including CSM-Earth, CSM-Lunar Module and CSM-Extravehicular crewman communications. An overview is provided for S-band communications, including data transmission and receiving rates, operating frequencies and major system components (pre-modulation processors, unified S-band electronics, S-band power amplifier and S-band antennas). Additionally, data transmission rates, operating frequencies and the capabilities of VHF communications are described. Major VHF components, including transmitters and receivers, and the VHF multiplexer and antennas are also highlighted. Finally, communications during pre-launch, ascent, in-flight and entry are discussed. Overall, the CSM communication system was rated highly by flight controllers and crew. The system was mostly autonomous for both crew and flight controllers and no major issues were encountered during flight.
NASA Technical Reports Server (NTRS)
Fasching, W. A.
1980-01-01
The improved single shank high pressure turbine design was evaluated in component tests consisting of performance, heat transfer and mechanical tests, and in core engine tests. The instrumented core engine test verified the thermal, mechanical, and aeromechanical characteristics of the improved turbine design. An endurance test subjected the improved single shank turbine to 1000 simulated flight cycles, the equivalent of approximately 3000 hours of typical airline service. Initial back-to-back engine tests demonstrated an improvement in cruise sfc of 1.3% and a reduction in exhaust gas temperature of 10 C. An additional improvement of 0.3% in cruise sfc and 6 C in EGT is projected for long service engines.
NASA Technical Reports Server (NTRS)
Cary, Everett; Smith, Danford
2004-01-01
The GSFC Mission Services Evolution Center (GMSEC) was established in 2001 to coordinate ground and flight data systems development and services at NASA's Goddard Space Flight Center (GSFC). GMSEC system architecture represents a new way to build the next generation systems to be used for a variety of missions for years to come. The old approach was to find or build the best products available and integrate them into a reusable system to meet everyone's needs. The new approach assumes that needs, products, and technology will change.
Satellite services system analysis study: Propellant transfer system
NASA Technical Reports Server (NTRS)
1982-01-01
General servicing requirements, a servicing mission concept and scenario, overall servicing needs, basic servicing equipment, and a general servicing mission configuration layout are addressed. Servicing needs, equipment concepts, system requirements equipment specifications, preliminary designs, and resource requirements for flight hardware for the propellant transfer system are also addressed.
CCSDS Spacecraft Monitor and Control Service Framework
NASA Technical Reports Server (NTRS)
Merri, Mario; Schmidt, Michael; Ercolani, Alessandro; Dankiewicz, Ivan; Cooper, Sam; Thompson, Roger; Symonds, Martin; Oyake, Amalaye; Vaughs, Ashton; Shames, Peter
2004-01-01
This CCSDS paper presents a reference architecture and service framework for spacecraft monitoring and control. It has been prepared by the Spacecraft Monitoring and Control working group of the CCSDS Mission Operations and Information Management Systems (MOIMS) area. In this context, Spacecraft Monitoring and Control (SM&C) refers to end-to-end services between on- board or remote applications and ground-based functions responsible for mission operations. The scope of SM&C includes: 1) Operational Concept: definition of an operational concept that covers a set of standard operations activities related to the monitoring and control of both ground and space segments. 2) Core Set of Services: definition of an extensible set of services to support the operational concept together with its information model and behaviours. This includes (non exhaustively) ground systems such as Automatic Command and Control, Data Archiving and Retrieval, Flight Dynamics, Mission Planning and Performance Evaluation. 3) Application-layer information: definition of the standard information set to be exchanged for SM&C purposes.
Outcomes of medical emergencies on commercial airline flights.
Peterson, Drew C; Martin-Gill, Christian; Guyette, Francis X; Tobias, Adam Z; McCarthy, Catherine E; Harrington, Scott T; Delbridge, Theodore R; Yealy, Donald M
2013-05-30
Worldwide, 2.75 billion passengers fly on commercial airlines annually. When in-flight medical emergencies occur, access to care is limited. We describe in-flight medical emergencies and the outcomes of these events. We reviewed records of in-flight medical emergency calls from five domestic and international airlines to a physician-directed medical communications center from January 1, 2008, through October 31, 2010. We characterized the most common medical problems and the type of on-board assistance rendered. We determined the incidence of and factors associated with unscheduled aircraft diversion, transport to a hospital, and hospital admission, and we determined the incidence of death. There were 11,920 in-flight medical emergencies resulting in calls to the center (1 medical emergency per 604 flights). The most common problems were syncope or presyncope (37.4% of cases), respiratory symptoms (12.1%), and nausea or vomiting (9.5%). Physician passengers provided medical assistance in 48.1% of in-flight medical emergencies, and aircraft diversion occurred in 7.3%. Of 10,914 patients for whom postflight follow-up data were available, 25.8% were transported to a hospital by emergency-medical-service personnel, 8.6% were admitted, and 0.3% died. The most common triggers for admission were possible stroke (odds ratio, 3.36; 95% confidence interval [CI], 1.88 to 6.03), respiratory symptoms (odds ratio, 2.13; 95% CI, 1.48 to 3.06), and cardiac symptoms (odds ratio, 1.95; 95% CI, 1.37 to 2.77). Most in-flight medical emergencies were related to syncope, respiratory symptoms, or gastrointestinal symptoms, and a physician was frequently the responding medical volunteer. Few in-flight medical emergencies resulted in diversion of aircraft or death; one fourth of passengers who had an in-flight medical emergency underwent additional evaluation in a hospital. (Funded by the National Institutes of Health.).
Piloted evaluation of an integrated propulsion and flight control simulator
NASA Technical Reports Server (NTRS)
Bright, Michelle M.; Simon, Donald L.
1992-01-01
A piloted evaluation of the integrated flight and propulsion control simulator for advanced integrated propulsion and airframe control design is described. The evaluation will cover control effector gains and deadbands, control effectiveness and control authority, and heads up display functionality. For this evaluation the flight simulator is configured for transition flight using an advanced Short Take-Off and Vertical Landing fighter aircraft model, a simplified high-bypass turbofan engine model, fighter cockpit displays, and pilot effectors. The piloted tasks used for rating displays and control effector gains are described. Pilot comments and simulation results confirm that the display symbology and control gains are very adequate for the transition flight task. Additionally, it is demonstrated that this small-scale, fixed base flight simulator facility can adequately perform a real time, piloted control evaluation.
Performance retention of the RB211 powerplant in service
NASA Technical Reports Server (NTRS)
Astridge, B. L.; Pinder, J. T.
1981-01-01
An understanding of the mechanisms of deterioration is essential in order that features to counteract performance degradation can be built into the basic design of an engine and nacelle. Furthermore, the interpretation must be continued in service for effective feedback to provide modifications which may be necessary in maintaining a satisfactory performance retention program. The in service assessment must be accurate as to magnitude and causes and this requires consideration of: (1) the powerplant as a complete entity, i.e., the engine components and nacelle including the thrust reverser; (2) measurement of performance in flight rather than by sole reliance on the scaling of test cell data to flight conditions (although some correlation should be possible); and (3) the relationship of engine parts condition to overhaul performance and in flight deterioration level of that engine. These aspects are addressed by consideration of the RB211 engine in service in both the Lockheed L1011 Tristar and Boeing 747 aircraft.
Operations Research Flight Ground Service Education/Outreach
NASA Technical Reports Server (NTRS)
Smith, Scott M.
2011-01-01
This viewgraph presentation describes a nutritional biochemistry assessment of astronauts in preflight, in-flight, and post-flight operations. In-flight collections of blood and urine samples from astronauts to test the effects of Vitamin K, Pro K, Vitamin D, Omega-3 Fatty Acids, Iron, and Sodium in spaceflight is shown. A demonstration of a 1-carbon metabolism pathway that determines the existence of enzymes and polymorphisms is also presented.
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to remove the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is secured on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is positioned on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dominick, F.; Lockwood, R.A.
1986-07-01
The US Army Aviation Engineering Flight Activity conducted an evaluation of Flight Management Calculator for the UH-1H. The calculator was a Hewlett-Packard HP-41CV. The performance calculator was evaluated for flight planning and in-flight use during 14 mission flights simulating operational conditions. The calculator was much easier to use in-flight than the operator's manual data. The calculator program needs improvement in the areas of pre-flight planning and execution speed. The mission flights demonstrated a 19% fuel saving using optimum over normal flight profiles in warm temperatures (15/sup 0/C above standard). Savings would be greater at colder temperatures because of increasing compressibilitymore » effects. Acceptable accuracy for individual aircraft under operational conditions may require a regressive analog model in which individual aircraft data are used to update the program. The performance data base for the UH-1H was expanded with level flight and hover data to thrust coefficients and Mach numbers to the practical limits of aircraft operation.« less
Heart rate and performance during combat missions in a flight simulator.
Lahtinen, Taija M M; Koskelo, Jukka P; Laitinen, Tomi; Leino, Tuomo K
2007-04-01
The psychological workload of flying has been shown to increase heart rate (HR) during flight simulator operation. The association between HR changes and flight performance remains unclear. There were 15 pilots who performed a combat flight mission in a Weapons Tactics Trainer simulator of an F-18 Hornet. An electrocardiogram (ECG) was recorded, and individual incremental heart rates (deltaHR) from the HR during rest were calculated for each flight phase and used in statistical analyses. The combat flight period was divided into 13 phases, which were evaluated on a scale of 1 to 5 by the flight instructor. HR increased during interceptions (from a mean resting level of 79.0 to mean value of 96.7 bpm in one of the interception flight phases) and decreased during the return to base and slightly increased during the ILS approach and landing. DeltaHR appeared to be similar among experienced and less experienced pilots. DeltaHR responses during the flight phases did not correlate with simulator flight performance scores. Overall simulator flight performance correlated statistically significantly (r = 0.50) with the F-18 Hornet flight experience. HR reflected the amount of cognitive load during the simulated flight. Hence, HR analysis can be used in the evaluation of the psychological workload of military simulator flight phases. However, more detailed flight performance evaluation methods are needed for this kind of complex flight simulation to replace the traditional but rough interval scales. Use of a visual analog scale by the flight instructors is suggested for simulator flight performance evaluation.
2011-12-15
Stennis Space Center test-fired Aerojet AJ26 flight engine No. 8 on Dec. 15, continuing a commercial partnership with Orbital Services Corporation. Orbital has partnered with NASA to provide commercial cargo flights to the International Space Station. The AJ26 engines tested at Stennis will power the company's Taurus II space launch vehicle on the flights.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
... Command Experience; Airmen Online Services; Confirmation of Effective Date AGENCY: Federal Aviation... flight experience requirements do not apply to a pilot in command who is employed by a commuter or on-demand operator if the pilot in command is in compliance with the specific pilot in command...
14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule
Code of Federal Regulations, 2011 CFR
2011-01-01
... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...
14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule
Code of Federal Regulations, 2013 CFR
2013-01-01
... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...
14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule
Code of Federal Regulations, 2014 CFR
2014-01-01
... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...
14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule
Code of Federal Regulations, 2012 CFR
2012-01-01
... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...
Code of Federal Regulations, 2010 CFR
2010-01-01
.... Hurley Air Traffic Control System Command Center. It is responsible for the administration of... 6). “Enhanced Computer Voice Reservation System (e-CVRS)” is the system used by the FAA to make... charter flights; hired aircraft service; ferry flights; and other non-passenger flights. Section 3...
Code of Federal Regulations, 2011 CFR
2011-01-01
...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...
Code of Federal Regulations, 2013 CFR
2013-01-01
...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... large certificated air carriers to file ``On-Time Flight Performance Reports'' and ``Mishandled-Baggage... On-Time Flight Performance Reports to identify problem areas within the air traffic control system... concerning their chances of on-time flights and the rate of mishandled baggage by the 18 largest scheduled...
14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...
14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...
14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...
14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...
14 CFR 11 - Functional Classification-Operating Expenses of Group II and Group III Air Carriers
Code of Federal Regulations, 2012 CFR
2012-01-01
... Operations. (a) This function shall include expenses incurred directly in the in-flight operation of aircraft... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...
Code of Federal Regulations, 2010 CFR
2010-01-01
...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...
Code of Federal Regulations, 2014 CFR
2014-01-01
...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...
14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...
78 FR 47235 - Airworthiness Directives; General Electric Company Turbofan Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... revenue flight cycles. These parts were then installed into engines and introduced into revenue service... cycle counts of those LLPs to account for the additional low cycle fatigue (LCF) life consumed during... Boeing 747-8 flight tests had consumed more cyclic life than they would have in revenue flight cycles...
Documentation of White Flight Control Room (WFCR), Building 30 during STS-109.
2002-03-07
JSC2002-E-08460 (7 March 2002) --- Flight directors Jeff Hanley (standing) and Bryan P. Austin watch the large screens from their consoles in the shuttle flight control room (WFCR) in Houston;s Mission Control Center (MCC) during the STS-109 Hubble Space Telescope (HST) servicing mission.
2005-04-28
PM] Abraham Overview, Mr. Robert Daunfeldt, Bofors Defence Summary Overview of an Advanced 2.75 Hypervelocity Weapon, Mr. Larry Bradford , CAT Flight...Substantially Improves 2.75 Rocket Lethality, Safety, Survivability Mr. Larry Bradford , CAT Flight Services, Inc. APKWS Flight Test Results Mr. Larry S
Automation and robotics and related technology issues for Space Station customer servicing
NASA Technical Reports Server (NTRS)
Cline, Helmut P.
1987-01-01
Several flight servicing support elements are discussed within the context of the Space Station. Particular attention is given to the servicing facility, the mobile servicing center, and the flight telerobotic servicer (FTS). The role that automation and robotics can play in the design and operation of each of these elements is discussed. It is noted that the FTS, which is currently being developed by NASA, will evolve to increasing levels of autonomy to allow for the virtual elimination of routine EVA. Some of the features of the FTS will probably be: dual manipulator arms having reach and dexterity roughly equivalent to that of an EVA-suited astronaut, force reflection capability allowing efficient teleoperation, and capability of operating from a variety of support systems.
Field of View Evaluation for Flight Simulators Used in Spatial Disorientation Training
2014-01-01
Naval Medical Research Unit Dayton FIELD OF VIEW EVALUATION FOR FLIGHT SIMULATORS USED IN SPATIAL DISORIENTATION TRAINING WILLIAMS, H.P...COVERED (from – to) 2013JUL30 to 2014JUN30 4. TITLE Field of View Evaluation for Flight Simulators Used in Spatial Disorientation Training 5a...simulator systems as well, and implications and recommendations for SD training are discussed. 3 Field of View Evaluation for Flight Simulators
Piloted evaluation of an integrated propulsion and flight control simulator
NASA Technical Reports Server (NTRS)
Bright, Michelle M.; Simon, Donald L.
1992-01-01
This paper describes a piloted evaluation of the integrated flight and propulsion control simulator at NASA Lewis Research Center. The purpose of this evaluation is to demonstrate the suitability and effectiveness of this fixed based simulator for advanced integrated propulsion and airframe control design. The evaluation will cover control effector gains and deadbands, control effectiveness and control authority, and heads up display functionality. For this evaluation the flight simulator is configured for transition flight using an advanced Short Take-Off and vertical Landing fighter aircraft model, a simplified high-bypass turbofan engine model, fighter cockpit, displays, and pilot effectors. The paper describes the piloted tasks used for rating displays and control effector gains. Pilot comments and simulation results confirm that the display symbology and control gains are very adequate for the transition flight task. Additionally, it is demonstrated that this small-scale, fixed base flight simulator facility can adequately perform a real time, piloted control evaluation.
Virtualized Multi-Mission Operations Center (vMMOC) and its Cloud Services
NASA Technical Reports Server (NTRS)
Ido, Haisam Kassim
2017-01-01
His presentation will cover, the current and future, technical and organizational opportunities and challenges with virtualizing a multi-mission operations center. The full deployment of Goddard Space Flight Centers (GSFC) Virtualized Multi-Mission Operations Center (vMMOC) is nearly complete. The Space Science Mission Operations (SSMO) organizations spacecraft ACE, Fermi, LRO, MMS(4), OSIRIS-REx, SDO, SOHO, Swift, and Wind are in the process of being fully migrated to the vMMOC. The benefits of the vMMOC will be the normalization and the standardization of IT services, mission operations, maintenance, and development as well as ancillary services and policies such as collaboration tools, change management systems, and IT Security. The vMMOC will also provide operational efficiencies regarding hardware, IT domain expertise, training, maintenance and support.The presentation will also cover SSMO's secure Situational Awareness Dashboard in an integrated, fleet centric, cloud based web services fashion. Additionally the SSMO Telemetry as a Service (TaaS) will be covered, which allows authorized users and processes to access telemetry for the entire SSMO fleet, and for the entirety of each spacecrafts history. Both services leverage cloud services in a secure FISMA High and FedRamp environment, and also leverage distributed object stores in order to house and provide the telemetry. The services are also in the process of leveraging the cloud computing services elasticity and horizontal scalability. In the design phase is the Navigation as a Service (NaaS) which will provide a standardized, efficient, and normalized service for the fleet's space flight dynamics operations. Additional future services that may be considered are Ground Segment as a Service (GSaaS), Telemetry and Command as a Service (TCaaS), Flight Software Simulation as a Service, etc.
Validation of Digital Systems in Avionics and Flight Control Applications Handbook. Volume 1.
1983-07-01
will also be available to Airways Facilities, Systems Research and Development Service, Air Traffic Control Service, and Flight Standards elements...2114, March 12-14, 1979. 3. Validation Methods Research for Fault-Tolerant Avionics and Control Systems-- *r Working Group Meeting II, NASA...command generation with the multiple methods becoming avail- able for closure of the outer control loop necessitates research on alternative integration
14 CFR 1214.114 - Provision of services.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.114 Provision of services. NASA will provide, solely at its discretion, services to the extent...
14 CFR 1214.114 - Provision of services.
Code of Federal Regulations, 2013 CFR
2013-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.114 Provision of services. NASA will provide, solely at its discretion, services to the extent...
14 CFR 1214.114 - Provision of services.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.114 Provision of services. NASA will provide, solely at its discretion, services to the extent...
14 CFR 1214.114 - Provision of services.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.114 Provision of services. NASA will provide, solely at its discretion, services to the extent...
The use of graphics in the design of the human-telerobot interface
NASA Technical Reports Server (NTRS)
Stuart, Mark A.; Smith, Randy L.
1989-01-01
The Man-Systems Telerobotics Laboratory (MSTL) of NASA's Johnson Space Center employs computer graphics tools in their design and evaluation of the Flight Telerobotic Servicer (FTS) human/telerobot interface on the Shuttle and on the Space Station. It has been determined by the MSTL that the use of computer graphics can promote more expedient and less costly design endeavors. Several specific examples of computer graphics applied to the FTS user interface by the MSTL are described.
NASA Technical Reports Server (NTRS)
1974-01-01
The work is reported, which was performed in the specific tasks of the Planetary Quarantine research program for developing parameter specifications of unmanned scientific missions to the planets. The effort was directed principally toward the advancement of the quarantine technology, applicable to all future missions to planets of biological interest. The emphasis of the research was on coordinated evaluation, analysis, documentation, and presentation of PQ requirements for flight projects such as Viking and Pioneer.
2011-08-31
CAPE CANAVERAL, Fla. -- An ambulance and several NASA Fire Rescue Services vehicles arrive to assist a Huey II helicopter participating in the aviation safety exercise during Emergency Response Safety Training at the Shuttle Landing Facility, Runway 33, at NASA’s Kennedy Space Center in Florida. The simulated helicopter mishap exercise was conducted to evaluate emergency response and mishap investigations of aircraft at Kennedy. Participants included Air Rescue Fire Fighters, Flight Operations, Disaster Preparedness, Security, and Safety. NASA mandates simulated aviation safety training take place every two years. Photo credit: NASA/Kim Shiflett
2011-08-31
CAPE CANAVERAL, Fla. -- A NASA Fire Rescue Services vehicle and a Huey II helicopter support the aviation safety exercise during Emergency Response Safety Training at the Shuttle Landing Facility, Runway 33, at NASA’s Kennedy Space Center in Florida. The simulated helicopter mishap exercise was conducted to evaluate emergency response and mishap investigations of aircraft at Kennedy. Participants included Air Rescue Fire Fighters, Flight Operations, Disaster Preparedness, Security, and Safety. NASA mandates simulated aviation safety training take place every two years. Photo credit: NASA/Kim Shiflett
2011-08-31
CAPE CANAVERAL, Fla. -- A NASA Fire Rescue Services vehicle, ambulance and Huey II helicopter take part in the aviation safety exercise during Emergency Response Safety Training at the Shuttle Landing Facility, Runway 33, at NASA’s Kennedy Space Center in Florida. The simulated helicopter mishap exercise was conducted to evaluate emergency response and mishap investigations of aircraft at Kennedy. Participants included Air Rescue Fire Fighters, Flight Operations, Disaster Preparedness, Security, and Safety. NASA mandates simulated aviation safety training take place every two years. Photo credit: NASA/Kim Shiflett
Space Telerobotics and Rover Research at JPL
NASA Technical Reports Server (NTRS)
Weisbin, C.; Hayati, S.; Rodriguez, G.
1995-01-01
The goal of our program is to develop, integrate and demonstrate the science and technology of remote telerobotics leading to increases in operational capability, safety, cost effectiveness and probability of success of NASA missions. To that end, the program fosters the development of innovative system concepts for on-orbit servicing and planetary surface missions which use telerobotic systems as an important central component. These concepts are carried forward into develoments which are used to evaluate and demonstrate technology in realistic flight and ground experiments.
Paul Hamel; Melinda J. Welton; Carl G. Smith; Robert R. Ford
2008-01-01
Estimation of population sizes of North American avian species has been attempted in the North American Landbird Conservation Plan. Such estimated numbers have considerable conservation value as starting points to estimate extinction probability, as was done for Cerulean Warbler (Dendroica cerulea) during the U.S. Fish and Wildlife Service evaluation of the petition to...
APOLLO IX - ART CONCEPTS - EXTRAVEHICULAR ACTIVITY (EVA)
1969-02-06
S69-18546 (February 1969) --- North American Rockwell artist's concept illustrating the docking of the Lunar Module ascent stage with the Command and Service Modules during the Apollo 9 mission. The two figures in the Lunar Module represent astronauts James A. McDivitt, Apollo 9 commander; and Russell L. Schweickart, lunar module pilot. The figure in the Command Module represents astronaut David R. Scott, command module pilot. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.
Saturn 5 Launch Vehicle Flight Evaluation Report-AS-512 Apollo 17 Mission
NASA Technical Reports Server (NTRS)
1973-01-01
An evaluation of the launch vehicle and lunar roving vehicle performance for the Apollo 17 flight is presented. The objective of the evaluation is to acquire, reduce, analyze, and report on flight data to the extent required to assure future mission success and vehicle reliability. Actual flight problems are identified, their causes are determined, and recommendations are made for corrective action. Summaries of launch operations and spacecraft performance are included. The significant events for all phases of the flight are analyzed.
Barrett during TVIS maintenance
2009-04-21
ISS019-E-008750 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barrett during TVIS maintenance
2009-04-21
ISS019-E-008752 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barrett during TVIS maintenance
2009-04-21
ISS019-E-008767 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Barrett during TVIS maintenance
2009-04-21
ISS019-E-008764 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Review of Considerations, Management, and Treatment of Medical Emergencies During Commercial Flight
2017-04-01
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for...assistance during an in-flight medical emergency. 15. SUBJECT TERMS In-flight medical emergency, commercial air travel , in-flight medical care...England [7-10]. These ground-based medical consultation services establish a 24- hour, 7-day, 365-days-per-year response capability for real- time
A Comparison of Center/TRACON Automation System and Airline Time of Arrival Predictions
NASA Technical Reports Server (NTRS)
Heere, Karen R.; Zelenka, Richard E.
2000-01-01
Benefits from information sharing between an air traffic service provider and a major air carrier are evaluated. Aircraft arrival time schedules generated by the NASA/FAA Center/TRACON Automation System (CTAS) were provided to the American Airlines System Operations Control Center in Fort Worth, Texas, during a field trial of a specialized CTAS display. A statistical analysis indicates that the CTAS schedules, based on aircraft trajectories predicted from real-time radar and weather data, are substantially more accurate than the traditional airline arrival time estimates, constructed from flight plans and en route crew updates. The improvement offered by CTAS is especially advantageous during periods of heavy traffic and substantial terminal area delay, allowing the airline to avoid large predictive errors with serious impact on the efficiency and profitability of flight operations.
NASA Technical Reports Server (NTRS)
Stewart, James F.; Shuck, Thomas L.
1990-01-01
Flight tests conducted with the self-repairing flight control system (SRFCS) installed on the NASA F-15 highly integrated digital electronic control aircraft are described. The development leading to the current SRFCS configuration is highlighted. Key objectives of the program are outlined: (1) to flight-evaluate a control reconfiguration strategy with three types of control surface failure; (2) to evaluate a cockpit display that will inform the pilot of the maneuvering capacity of the damage aircraft; and (3) to flight-evaluate the onboard expert system maintenance diagnostics process using representative faults set to occur only under maneuvering conditions. Preliminary flight results addressing the operation of the overall system, as well as the individual technologies, are included.
Satellite servicing mission preliminary cost estimation model
NASA Technical Reports Server (NTRS)
1987-01-01
The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.
14 CFR § 1214.114 - Provision of services.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.114 Provision of services. NASA will provide, solely at its discretion, services to the extent...
14 CFR Sec. 19-4 - Service classes.
Code of Federal Regulations, 2010 CFR
2010-01-01
... a composite of first class, coach, and mixed passenger/cargo service. The following classifications... integral part of services performed pursuant to published flight schedules. The following classifications... Classifications Sec. 19-4 Service classes. The statistical classifications are designed to reflect the operating...
14 CFR Sec. 19-4 - Service classes.
Code of Federal Regulations, 2011 CFR
2011-01-01
... a composite of first class, coach, and mixed passenger/cargo service. The following classifications... integral part of services performed pursuant to published flight schedules. The following classifications... Classifications Sec. 19-4 Service classes. The statistical classifications are designed to reflect the operating...
Code of Federal Regulations, 2011 CFR
2011-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2012 CFR
2012-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2010 CFR
2010-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2014 CFR
2014-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2013 CFR
2013-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-06
... change planes at an intermediate stop. In addition to one-flight-to-one-flight change-of-gauge services... changes planes, but in addition, the single flight to or from the exchange point itself has multiple... valuable consumer benefits, they can be confusing and misleading unless consumers are given reasonable and...
2014-09-07
CAPE CANAVERAL, Fla. – Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion crew and service module stack for Exploration Flight Test-1 was lifted by crane out of the test cell. The stack has been lowered onto the mating device. Technicians are attaching the stack to the mating device. A protective covering surrounds the crew module. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch later this year atop a Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Ben Smegelsky
2014-09-07
CAPE CANAVERAL, Fla. – Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, a crane has lifted the Orion crew and service module stack for Exploration Flight Test-1 out of the test cell and is being transferred to a mating device. A protective covering surrounds the crew module. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch later this year atop a Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Ben Smegelsky
2014-09-07
CAPE CANAVERAL, Fla. – Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion crew and service module stack for Exploration Flight Test-1 was lifted by crane out of the test cell and is being lowered onto a mating device A protective covering surrounds the crew module. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch later this year atop a Delta IV Heavy rocket from Cape Canaveral Air Force Station in Florida to an altitude of 3,600 miles above the Earth's surface. The two-orbit, four-hour flight test will help engineers evaluate the systems critical to crew safety including the heat shield, parachute system and launch abort system. For more information, visit http://www.nasa.gov/orion. Photo credit: NASA/Ben Smegelsky
Test and Verification Approach for the NASA Constellation Program
NASA Technical Reports Server (NTRS)
Strong, Edward
2008-01-01
This viewgraph presentation is a test and verification approach for the NASA Constellation Program. The contents include: 1) The Vision for Space Exploration: Foundations for Exploration; 2) Constellation Program Fleet of Vehicles; 3) Exploration Roadmap; 4) Constellation Vehicle Approximate Size Comparison; 5) Ares I Elements; 6) Orion Elements; 7) Ares V Elements; 8) Lunar Lander; 9) Map of Constellation content across NASA; 10) CxP T&V Implementation; 11) Challenges in CxP T&V Program; 12) T&V Strategic Emphasis and Key Tenets; 13) CxP T&V Mission & Vision; 14) Constellation Program Organization; 15) Test and Evaluation Organization; 16) CxP Requirements Flowdown; 17) CxP Model Based Systems Engineering Approach; 18) CxP Verification Planning Documents; 19) Environmental Testing; 20) Scope of CxP Verification; 21) CxP Verification - General Process Flow; 22) Avionics and Software Integrated Testing Approach; 23) A-3 Test Stand; 24) Space Power Facility; 25) MEIT and FEIT; 26) Flight Element Integrated Test (FEIT); 27) Multi-Element Integrated Testing (MEIT); 28) Flight Test Driving Principles; and 29) Constellation s Integrated Flight Test Strategy Low Earth Orbit Servicing Capability.
1981-01-01
The primary purpose of the Spacelab-3 mission was to conduct materials science experiments in a stable low-gravity environment. In addition, the crew did research in life sciences, fluid mechanics, atmospheric science, and astronomy. Spacelab-3 was equipped with several new mini-labs, special facilities that would be used repeatedly on future flights. Two elaborate crystal growth furnaces, a life support and housing facility for small animals, and two types of apparatus for the study of fluids were evaluated on their inaugural flight. The instruments requiring direct exposure to space were mounted outside in the open payload bay of the Shuttle. Spacelab represented the merger of science and marned spaceflight. It opened remarkable opportunities to push the frontiers of knowledge beyond the limits of research on Earth. Scientists in space performed experiments in close collaboration with their colleagues on the ground. On the Spacelab-3 mission, managed by the Marshall Space Flight Center, this versatile laboratory entered routine operation service for the next two decades. Spacelab-3 (STS-51B mission) was launched aboard Space Shuttle Orbiter Challenger on April 29, 1985.
Post-Flight Analysis of GPSR Performance During Orion Exploration Flight Test 1
NASA Technical Reports Server (NTRS)
Barker, Lee; Mamich, Harvey; McGregor, John
2016-01-01
On 5 December 2014, the first test flight of the Orion Multi-Purpose Crew Vehicle executed a unique and challenging flight profile including an elevated re-entry velocity and steeper flight path angle to envelope lunar re-entry conditions. A new navigation system including a single frequency (L1) GPS receiver was evaluated for use as part of the redundant navigation system required for human space flight. The single frequency receiver was challenged by a highly dynamic flight environment including flight above low Earth orbit, as well as single frequency operation with ionospheric delay present. This paper presents a brief description of the GPS navigation system, an independent analysis of flight telemetry data, and evaluation of the GPSR performance, including evaluation of the ionospheric model employed to supplement the single frequency receiver. Lessons learned and potential improvements will be discussed.
Ares I-X Flight Data Evaluation: Executive Overview
NASA Technical Reports Server (NTRS)
Huebner, Lawrence D.; Waits, David A.; Lewis, Donny L.; Richards, James S.; Coates, R. H., Jr.; Cruit, Wendy D.; Bolte, Elizabeth J.; Bangham, Michal E.; Askins, Bruce R.; Trausch, Ann N.
2011-01-01
NASA's Constellation Program (CxP) successfully launched the Ares I-X flight test vehicle on October 28, 2009. The Ares I-X flight was a developmental flight test to demonstrate that this very large, long, and slender vehicle could be controlled successfully. The flight offered a unique opportunity for early engineering data to influence the design and development of the Ares I crew launch vehicle. As the primary customer for flight data from the Ares I-X mission, the Ares Projects Office (APO) established a set of 33 flight evaluation tasks to correlate flight results with prospective design assumptions and models. The flight evaluation tasks used Ares I-X data to partially validate tools and methodologies in technical disciplines that will ultimately influence the design and development of Ares I and future launch vehicles. Included within these tasks were direct comparisons of flight data with preflight predictions and post-flight assessments utilizing models and processes being applied to design and develop Ares I. The benefits of early development flight testing were made evident by results from these flight evaluation tasks. This overview provides summary information from assessment of the Ares I-X flight test data and represents a small subset of the detailed technical results. The Ares Projects Office published a 1,600-plus-page detailed technical report that documents the full set of results. This detailed report is subject to the International Traffic in Arms Regulations (ITAR) and is available in the Ares Projects Office archives files.
Culbertson and Haignere work in the Service Module during Expedition Three
2001-10-23
ISS003-E-6854 (23-31 October 2001) --- Astronaut Frank L. Culbertson, Jr. (left), Expedition Three mission commander, and French Flight Engineer Claudie Haignere, work in the Zvezda Service Module on the International Space Station (ISS). Haignere represents ESA, carrying out a flight program for CNES, the French Space Agency, under a commercial contract with the Russian Aviation and Space Agency. This image was taken with a digital still camera.
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, at ground-level left, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
2008-07-18
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, seen behind the ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
Outcomes of Medical Emergencies on Commercial Airline Flights
Peterson, Drew C.; Martin-Gill, Christian; Guyette, Francis X.; Tobias, Adam Z.; McCarthy, Catherine E.; Harrington, Scott T.; Delbridge, Theodore R.; Yealy, Donald M.
2013-01-01
Background Worldwide, 2.75 billion passengers fly on commercial airlines annually. When inflight medical emergencies occur, access to care is limited. We describe in-flight medical emergencies and the outcomes of these events. Methods We reviewed records of in-flight medical emergency calls from five domestic and international airlines to a physician-directed medical communications center from January 1, 2008, through October 31, 2010. We characterized the most common medical problems and the type of on-board assistance rendered. We determined the incidence of and factors associated with unscheduled aircraft diversion, transport to a hospital, and hospital admission, and we determined the incidence of death. Results There were 11,920 in-flight medical emergencies resulting in calls to the center (1 medical emergency per 604 flights). The most common problems were syncope or presyncope (37.4% of cases), respiratory symptoms (12.1%), and nausea or vomiting (9.5%). Physician passengers provided medical assistance in 48.1% of in-flight medical emergencies, and aircraft diversion occurred in 7.3%. Of 10,914 patients for whom postflight follow-up data were available, 25.8% were transported to a hospital by emergency-medical-service personnel, 8.6% were admitted, and 0.3% died. The most common triggers for admission were possible stroke (odds ratio, 3.36; 95% confidence interval [CI], 1.88 to 6.03), respiratory symptoms (odds ratio, 2.13; 95% CI, 1.48 to 3.06), and cardiac symptoms (odds ratio, 1.95; 95% CI, 1.37 to 2.77). Conclusions Most in-flight medical emergencies were related to syncope, respiratory symptoms, or gastrointestinal symptoms, and a physician was frequently the responding medical volunteer. Few in-flight medical emergencies resulted in diversion of aircraft or death; one fourth of passengers who had an in-flight medical emergency underwent additional evaluation in a hospital. (Funded by the National Institutes of Health.) PMID:23718164
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-05
... below. Technical Questions: Dale E. Roberts, Air Transportation Division, Flight Standards Service, Federal Aviation Administration; email dale[email protected] . Legal Questions: Alex Zektser, Office of...
Experimental Validation: Subscale Aircraft Ground Facilities and Integrated Test Capability
NASA Technical Reports Server (NTRS)
Bailey, Roger M.; Hostetler, Robert W., Jr.; Barnes, Kevin N.; Belcastro, Celeste M.; Belcastro, Christine M.
2005-01-01
Experimental testing is an important aspect of validating complex integrated safety critical aircraft technologies. The Airborne Subscale Transport Aircraft Research (AirSTAR) Testbed is being developed at NASA Langley to validate technologies under conditions that cannot be flight validated with full-scale vehicles. The AirSTAR capability comprises a series of flying sub-scale models, associated ground-support equipment, and a base research station at NASA Langley. The subscale model capability utilizes a generic 5.5% scaled transport class vehicle known as the Generic Transport Model (GTM). The AirSTAR Ground Facilities encompass the hardware and software infrastructure necessary to provide comprehensive support services for the GTM testbed. The ground facilities support remote piloting of the GTM aircraft, and include all subsystems required for data/video telemetry, experimental flight control algorithm implementation and evaluation, GTM simulation, data recording/archiving, and audio communications. The ground facilities include a self-contained, motorized vehicle serving as a mobile research command/operations center, capable of deployment to remote sites when conducting GTM flight experiments. The ground facilities also include a laboratory based at NASA LaRC providing near identical capabilities as the mobile command/operations center, as well as the capability to receive data/video/audio from, and send data/audio to the mobile command/operations center during GTM flight experiments.
2005-08-11
The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
2005-08-11
The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT this morning, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.
NASA Technical Reports Server (NTRS)
1977-01-01
NASA is planning now toward the day of long-duration flight-manned interplanetary missions for example-wherein routine health care and emergency treatment must be accomplished on-board the spacecraft over periods of months or perhaps even years. Since spacecraft design limits crew size, the medical assignment may be handled by a single astronaut-physician or by a crew member trained as a physician's assistant. In a space emergency demanding surgery, for instance, sophisticated communications equipment, backed by a computerized data processing system, would make it possible for a surgeon on Earth to "examine" the patient. He could study X-rays and other data, specify an in-flight surgical procedure, and guide the astronaut-medic step-by-step through the operation. Such a system is being evaluated now. It is called STARPAHC (Space Technology Applied to Rural Papago Health Care). NASA technology in space communications and data processing is being applied to remote health services for the Papago tribe. STARPAHC is administered by the NASA Life Sciences Directorate in the Office of Space Sciences. It is a joint program involving NASA's Johnson Space Center, the Indian Health Service of the Department of Health, Education & Welfare, and the Papago's Executive Health Council. Lockheed Missiles & Space Co. is NASA's systems support contractor.
NASA Technical Reports Server (NTRS)
Burcham, Frank W., Jr.; Maine, Trindel A.; Fullerton, C. Gordon; Webb, Lannie Dean
1996-01-01
A propulsion-controlled aircraft (PCA) system for emergency flight control of aircraft with no flight controls was developed and flight tested on an F-15 aircraft at the NASA Dryden Flight Research Center. The airplane has been flown in a throttles-only manual mode and with an augmented system called PCA in which pilot thumbwheel commands and aircraft feedback parameters were used to drive the throttles. Results from a 36-flight evaluation showed that the PCA system can be used to safety land an airplane that has suffered a major flight control system failure. The PCA system was used to recover from a severe upset condition, descend, and land. Guest pilots have also evaluated the PCA system. This paper describes the principles of throttles-only flight control; a history of loss-of-control accidents; a description of the F-15 aircraft; the PCA system operation, simulation, and flight testing; and the pilot comments.
47 CFR 87.345 - Scope of service.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES... communications for vehicles operating on an airport movement area. An airport movement area is defined as the... communications outlet station (RCO) or FAA flight service station in operation, communications by an aeronautical...
Saturn 5 launch vehicle flight evaluation report-AS-509 Apollo 14 mission
NASA Technical Reports Server (NTRS)
1971-01-01
A postflight analysis of the Apollo 14 flight is presented. The basic objective of the flight evaluation is to acquire, reduce, analyze, and report on flight data to the extent required to assure future mission success and vehicle reliability. Actual flight failures are identified, their causes are determined and corrective actions are recommended. Summaries of launch operations and spacecraft performance are included. The significant events for all phases of the flight are analyzed.
Spartan service module finite element modeling technique and analysis
NASA Technical Reports Server (NTRS)
Lindenmoyer, A. J.
1985-01-01
Sounding rockets have served as a relatively inexpensive and easy method of carrying experiments into the upper atmosphere. Limited observation time and pointing capabilities suggested the development of a new sounding rocket type carrier compatible with NASA's Space Transportation System. This concept evolved into the Spartan program, now credited with a successful Spartan 101 mission launched in June 1985. The next series of Spartans will use a service module primary structure. This newly designed reusable and universal component in the Spartan carrier system required thorough analysis and evaluation for flight certification. Using advanced finite element modeling techniques, the structure was analyzed and determined acceptable by meeting strict design goals and will be tested for verification of the analytical results.
Efficient management of cardiovascular risk screening programs
NASA Technical Reports Server (NTRS)
Roth, Carol
1993-01-01
The Environmental Health Unit, located on-site at the the Goddard Space Flight Center (GSFC), is responsible for the implementation of the Center's Employee Environmental and Occupational Health Program. The Health Unit, Health Physics (HP), and Industrial Hygiene (IH) staffs collaborate to provide quality service to the employees at GSFC. The Health Unit staff identifies, evaluates, and ensures the control of occupational hazards on the Center. In the past, components of the Industrial Hygiene Program have included the Industrial Hygiene Health Hazard Identification Program (IHHIP), the Hearing Conservation Program (HCP), the Hazard Communication Program, and the bi-annual fume hood survey. More recently, the Environmental Health Unit has expanded its services by adding the Ergonomics Program. Various aspects of the Ergonomics Program are discussed.
NASA Technical Reports Server (NTRS)
Pass, Ralph P.
1988-01-01
Recently, the United States has increased its activities related to aircraft icing in numerous fields: ice phobics, revised characterization of icing conditions, instrument development/evaluation, de-ice/anti-ice devices, simulated supercooled clouds, computer simulation and flight tests. The Federal Coordinator for Meteorology is involved in two efforts, one a National Plan on Aircraft Icing and the other a plan for Improved Aircraft Icing Forecasts and Associated Warning Services. These two plans will provide an approved structure for future U.S. activities related to aircraft icing. The recommended activities will significantly improve the position of government agencies to perform mandated activities and to enable U.S. manufacturers to be competitive in the world market.
Wakata during TVIS maintenance
2009-04-21
ISS019-E-008758 (21 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Chamitoff performs maintenance on the TVIS during Expedition 17
2008-08-12
ISS017-E-012864 (12 Aug. 2008) --- NASA astronaut Greg Chamitoff, Expedition 17 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
UAS flight test for safety and for efficiency
DOT National Transportation Integrated Search
2017-04-01
Manned aircraft that operate in the National Airspace System (NAS) typically undergo certification flight test to ensure they meet a prescribed level of safetydependent on their categorybefore they are able to enter service [for example, Federa...
Flaw Growth in Complex Structure. Volume 1. Technical Discussion
1977-12-01
I, " RESIDUAL STRENGTH LOAD REQUIREMENT PXX LT PXX DM Pxx ESV PXX PWV PXX G([E "XX IfI FOR SAID PERIOD I I I STRUCTURE COMPLEES IN SERVICE DFPOT OX...INSPECTABILITY T THROUGH PERIOD XTX FE In-Flight Evident Return to Base PFE 2GE Ground Evident 1 Flight P GE 2WV Walkaround 50 Flights PWV SV Special
NASA Technical Reports Server (NTRS)
1994-01-01
The NASA budget request has been restructured in FY 1995 into four appropriations: human space flight; science, aeronautics, and technology; mission support; and inspector general. The human space flight appropriations provides funding for NASA's human space flight activities. This includes the on-orbit infrastructure (space station and Spacelab), transportation capability (space shuttle program, including operations, program support, and performance and safety upgrades), and the Russian cooperation program, which includes the flight activities associated with the cooperative research flights to the Russian Mir space station. These activities are funded in the following budget line items: space station, Russian cooperation, space shuttle, and payload utilization and operations. The science, aeronautics, and technology appropriations provides funding for the research and development activities of NASA. This includes funds to extend our knowledge of the earth, its space environment, and the universe and to invest in new technologies, particularly in aeronautics, to ensure the future competitiveness of the nation. These objectives are achieved through the following elements: space science, life and microgravity sciences and applications, mission to planet earth, aeronautical research and technology, advanced concepts and technology, launch services, mission communication services, and academic programs.
Ground-to-Flight Handling Qualities Comparisons for a High Performance Airplane
NASA Technical Reports Server (NTRS)
Brandon, Jay M.; Glaab, Louis J.; Brown, Philip W.; Phillips, Michael R.
1995-01-01
A flight test program was conducted in conjunction with a ground-based piloted simulation study to enable a comparison of handling qualities ratings for a variety of maneuvers between flight and simulation of a modern high performance airplane. Specific objectives included an evaluation of pilot-induced oscillation (PIO) tendencies and a determination of maneuver types which result in either good or poor ground-to-flight pilot handling qualities ratings. A General Dynamics F-16XL aircraft was used for the flight evaluations, and the NASA Langley Differential Maneuvering Simulator was employed for the ground based evaluations. Two NASA research pilots evaluated both the airplane and simulator characteristics using tasks developed in the simulator. Simulator and flight tests were all conducted within approximately a one month time frame. Maneuvers included numerous fine tracking evaluations at various angles of attack, load factors and speed ranges, gross acquisitions involving longitudinal and lateral maneuvering, roll angle captures, and an ILS task with a sidestep to landing. Overall results showed generally good correlation between ground and flight for PIO tendencies and general handling qualities comments. Differences in pilot technique used in simulator evaluations and effects of airplane accelerations and motions are illustrated.
Lockheed L-1101 avionic flight control redundant systems
NASA Technical Reports Server (NTRS)
Throndsen, E. O.
1976-01-01
The Lockheed L-1011 automatic flight control systems - yaw stability augmentation and automatic landing - are described in terms of their redundancies. The reliability objectives for these systems are discussed and related to in-service experience. In general, the availability of the stability augmentation system is higher than the original design requirement, but is commensurate with early estimates. The in-service experience with automatic landing is not sufficient to provide verification of Category 3 automatic landing system estimated availability.
Irresistable: Service Masks, Goldwater-Nichols, and Overcoming Service Barriers to JFACC
2016-06-10
Air Forces IFR In Flight Refueling JCS Joint Chiefs of Staff JFACC Joint Force Air Component Commander JFC Joint Force Commander LOC Lines of...culture, diplomacy, and beyond.7 The focus is on the personalities that build and develop the technology and thus their impact on history. This broad...embarked Air Group 5 contained propeller and first-generation jets. In the days before in- flight-refueling ( IFR ), these aircraft could only manage a
Career Profiles- Drawing Controller Kelvin Siu- Operations Engineering Branch
2016-06-23
The Drawing Control group provides project support in the form of drafting services, drawing version management, and drawing archival. The office provides drafting services through creation of new drawings and sketches, or integration of red-lines. They maintain physical and electronic storage of flight vehicle drawings, and archive all sketches for the AFRC community. This office is the controlling organization for all Armstrong drawing formats and maintains the drawing numbering system for flight vehicle projects.
Flight telerobotic servicer legacy
NASA Astrophysics Data System (ADS)
Shattuck, Paul L.; Lowrie, James W.
1992-11-01
The Flight Telerobotic Servicer (FTS) was developed to enhance and provide a safe alternative to human presence in space. The first step for this system was a precursor development test flight (DTF-1) on the Space Shuttle. DTF-1 was to be a pathfinder for manned flight safety of robotic systems. The broad objectives of this mission were three-fold: flight validation of telerobotic manipulator (design, control algorithms, man/machine interfaces, safety); demonstration of dexterous manipulator capabilities on specific building block tasks; and correlation of manipulator performance in space with ground predictions. The DTF-1 system is comprised of a payload bay element (7-DOF manipulator with controllers, end-of-arm gripper and camera, telerobot body with head cameras and electronics module, task panel, and MPESS truss) and an aft flight deck element (force-reflecting hand controller, crew restraint, command and display panel and monitors). The approach used to develop the DTF-1 hardware, software and operations involved flight qualification of components from commercial, military, space, and R controller, end-of-arm tooling, force/torque transducer) and the development of the telerobotic system for space applications. The system is capable of teleoperation and autonomous control (advances state of the art); reliable (two-fault tolerance); and safe (man-rated). Benefits from the development flight included space validation of critical telerobotic technologies and resolution of significant safety issues relating to telerobotic operations in the Shuttle bay or in the vicinity of other space assets. This paper discusses the lessons learned and technology evolution that stemmed from developing and integrating a dexterous robot into a manned system, the Space Shuttle. Particular emphasis is placed on the safety and reliability requirements for a man-rated system as these are the critical factors which drive the overall system architecture. Other topics focused on include: task requirements and operational concepts for servicing and maintenance of space platforms; origins of technology for dexterous robotic systems; issues associated with space qualification of components; and development of the industrial base to support space robotics.
In-situ ultrasonic inspection of submarine shaft seal housing for corrosion damage
NASA Astrophysics Data System (ADS)
Batra, Narendra K.; Chaskelis, Henry H.; Mignogna, Richard B.
1995-06-01
The interior of the housings of primary and backup shaft seals of 637 class submarines are exposed to sea water during service and become corroded during service. Corrosion damage evaluation requires disassembly of the housing and visual inspection. In this paper, we present quantitative results of in situ nondestructive ultrasonic technique developed for the inspection of the seal housings. Due to vast variations in velocity in the seal material, the velocity was determined at suitable sites not subjected to corrosion and of known thickness from the blueprints. Using this normalized velocity and measured time-of-flight, we determined the thickness of the seal housing at various locations on the circumference. Subsequent mechanical thickness measurements, made when the housings were removed from service, agreed within the predicted uncertainty of 1.5% of ultrasonic measurements. This technique for the assessment of corrosion damage saves time and money, by preventing premature disassembly and downtime for the submarine.
Comparison of Different Methods of Grading a Level Turn Task on a Flight Simulator
NASA Technical Reports Server (NTRS)
Heath, Bruce E.; Crier, tomyka
2003-01-01
With the advancements in the computing power of personal computers, pc-based flight simulators and trainers have opened new avenues in the training of airplane pilots. It may be desirable to have the flight simulator make a quantitative evaluation of the progress of a pilot's training thereby reducing the physical requirement of the flight instructor who must, in turn, watch every flight. In an experiment, University students conducted six different flights, each consisting of two level turns. The flights were three minutes in duration. By evaluating videotapes, two certified flight instructors provided separate letter grades for each turn. These level turns were also evaluated using two other computer based grading methods. One method determined automated grades based on prescribed tolerances in bank angle, airspeed and altitude. The other method used was deviations in altitude and bank angle for performance index and performance grades.
NASA Technical Reports Server (NTRS)
Donohue, Paul F.
1987-01-01
The results of an aerodynamic performance evaluation of the National Aeronautics and Space Administration (NASA)/Ames Research Center Advanced Concepts Flight Simulator (ACFS), conducted in association with the Navy-NASA Joint Institute of Aeronautics, are presented. The ACFS is a full-mission flight simulator which provides an excellent platform for the critical evaluation of emerging flight systems and aircrew performance. The propulsion and flight dynamics models were evaluated using classical flight test techniques. The aerodynamic performance model of the ACFS was found to realistically represent that of current day, medium range transport aircraft. Recommendations are provided to enhance the capabilities of the ACFS to a level forecast for 1995 transport aircraft. The graphical and tabular results of this study will establish a performance section of the ACFS Operation's Manual.
Flight Dynamics and GN&C for Spacecraft Servicing Missions
NASA Technical Reports Server (NTRS)
Naasz, Bo; Zimpfer, Doug; Barrington, Ray; Mulder, Tom
2010-01-01
Future human exploration missions and commercial opportunities will be enabled through In-space assembly and satellite servicing. Several recent efforts have developed technologies and capabilities to support these exciting future missions, including advances in flight dynamics and Guidance, Navigation and Control. The Space Shuttle has demonstrated significant capabilities for crewed servicing of the Hubble Space Telescope (HST) and assembly of the International Space Station (ISS). Following the Columbia disaster NASA made significant progress in developing a robotic mission to service the HST. The DARPA Orbital Express mission demonstrated automated rendezvous and capture, In-space propellant transfer, and commodity replacement. This paper will provide a summary of the recent technology developments and lessons learned, and provide a focus for potential future missions.
Visual cues to geographical orientation during low-level flight
NASA Technical Reports Server (NTRS)
Battiste, Vernol; Delzell, Suzanne
1991-01-01
A field study of an operational Emergency Medical Service (EMS) unit was conducted to investigate the relationships among geographical orientation, pilot decision making, and workload in EMS flights. The map data collected during this study were compared to protocols gathered in the laboratory, where pilots viewed a simulated flight over different types of unfamiliar terrain and verbally identified the features utilized to maintain geographical orientation. The EMS pilot's questionnaire data were compared with data from non-EMS helicopter pilots with comparable flight experience.
Data Service Provider Cost Estimation Tool
NASA Technical Reports Server (NTRS)
Fontaine, Kathy; Hunolt, Greg; Booth, Arthur L.; Banks, Mel
2011-01-01
The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.
NASA Technical Reports Server (NTRS)
Shelton, Kevin J.; Kramer, Lynda J.; Ellis,Kyle K.; Rehfeld, Sherri A.
2012-01-01
The Synthetic and Enhanced Vision Systems for NextGen (SEVS) simulation and flight tests are jointly sponsored by NASA's Aviation Safety Program, Vehicle Systems Safety Technology project and the Federal Aviation Administration (FAA). The flight tests were conducted by a team of Honeywell, Gulfstream Aerospace Corporation and NASA personnel with the goal of obtaining pilot-in-the-loop test data for flight validation, verification, and demonstration of selected SEVS operational and system-level performance capabilities. Nine test flights (38 flight hours) were conducted over the summer and fall of 2011. The evaluations were flown in Gulfstream.s G450 flight test aircraft outfitted with the SEVS technology under very low visibility instrument meteorological conditions. Evaluation pilots flew 108 approaches in low visibility weather conditions (600 ft to 2400 ft visibility) into various airports from Louisiana to Maine. In-situ flight performance and subjective workload and acceptability data were collected in collaboration with ground simulation studies at LaRC.s Research Flight Deck simulator.
Evaluation of Standard Gear Metrics in Helicopter Flight Operation
NASA Technical Reports Server (NTRS)
Mosher, M.; Pryor, A. H.; Huff, E. M.
2002-01-01
Each false alarm made by a machine monitoring system carries a high price tag. The machine must be taken out of service, thoroughly inspected with possible disassembly, and then made ready for service. Loss of use of the machine and the efforts to inspect it are costly. In addition, if a monitoring system is prone to false alarms, the system will soon be turned off or ignored. For aircraft applications, one growing concern is that the dynamic flight environment differs from the laboratory environment where fault detection methods are developed and tested. Vibration measurements made in flight are less stationary than those made in a laboratory, or test facility, and thus a given fault detection method may produce more false alarms in flight than might be anticipated. In 1977. Stewart introduced several metrics, including FM0 and FM4, for evaluating the health of a gear. These metrics are single valued functions of the vibration signal that indicate if the signal deviates from an ideal model of the signal. FM0 is a measure of the ratio of the peak-to-peak level to the harmonic energy in the signal. FM4 is the kurtosis of the signal with the gear mesh harmonics and first order side bands removed. The underlying theory is that a vibration signal from a gear in good condition is expected to be dominated by a periodic signal at the gear mesh frequency. If one or a small number of gear teeth contain damage or faults, the signal will change, possibly showing increased amplitude, local phase changes or both near the damaged region of the gear. FM0 increases if a signal contains a local increase in amplitude. FM4 increases if a signal contains a local increase in amplitude or local phase change in a periodic signal. Over the years, other single value metrics were also introduced to detect the onset and growth of damage in gears. These various metrics have detected faults in several gear tests in experimental test rigs. Conditions in these tests have been steady state in the sense that the rpm, torque and forces on the gear have been held steady. For gears used in a dynamic environment such as that occurring in aircraft, the rpm, torque and forces on the gear are constantly changing. The authors have measured significant variation in rpm and torque in the transmissions of helicopters in controlled steady flight conditions flown by highly proficient test pilots. Statistical analyses of the data taken in flight show significant nonstationarity in the vibration measurements. These deviations from stationarity may increase false alarms in gear monitoring during aircraft flight. In the proposed paper, the authors will study vibration measurements made in flight on an AH- 1 Cobra and an OH-58C Kiowa helicopters. The primary focus will be the development of a methodology to assess the impact of nonstationarity on false alarms. Issues to be addressed include how time synchronous averages are constructed from raw data as well as how lack of stationarity effects the behavior of single value metrics. Emphasis will be placed on the occurrence of false alarms with the use of standard metrics. In order to maintain an acceptable level of false alarms in the flight environment, this study will also address the determination of appropriate threshold levels, which may need to be higher than for test rigs.
Eyharts performs TVIS maintenance
2008-03-03
ISS016-E-030559 (4 March 2008) --- European Space Agency (ESA) astronaut Leopold Eyharts, Expedition 16 flight engineer, works with the Treadmill Vibration Isolation System (TVIS) removed from the Zvezda Service Module floor during in-flight maintenance (IFM) on the International Space Station.
STEP flight experiments Large Deployable Reflector (LDR) telescope
NASA Technical Reports Server (NTRS)
Runge, F. C.
1984-01-01
Flight testing plans for a large deployable infrared reflector telescope to be tested on a space platform are discussed. Subsystem parts, subassemblies, and whole assemblies are discussed. Assurance of operational deployability, rigidization, alignment, and serviceability will be sought.
Shuttle user analysis (study 2.2). Volume 2: User charge analysis. Part 1: Summary
NASA Technical Reports Server (NTRS)
1974-01-01
Alternative candidate STS flight charge approaches which will provide a basis for NASA's determination of an STS flight charge policy were analyzed. The analysis used STS transportation costs furnished by NASA. The STS User Charge Analysis was accomplished by (1) generating criteria for evaluation of alternative flight charge approaches, (2) defining alternative flight charge approaches, (3) computing flight charges for selected missions, (4) evaluating results using the criteria generated under (1), and (5) recommending flight charge approaches to be used as a basis for the formulation of a STS user flight charge policy.
NASA Technical Reports Server (NTRS)
Steinmetz, G. G.
1986-01-01
The development of an electronic primary flight display format aligned with the aircraft velocity vector, a simulation evaluation comparing this format with an electronic attitude-aligned primary flight display format, and a flight evaluation of the velocity-vector-aligned display format are described. Earlier tests in turbulent conditions with the electronic attitude-aligned display format had exhibited unsteadiness. A primary objective of aligning the display format with the velocity vector was to take advantage of a velocity-vector control-wheel steering system to provide steadiness of display during turbulent conditions. Better situational awareness under crosswind conditions was also achieved. The evaluation task was a curved, descending approach with turbulent and crosswind conditions. Primary flight display formats contained computer-drawn perspective runway images and flight-path angle information. The flight tests were conducted aboard the NASA Transport Systems Research Vehicle (TSRV). Comparative results of the simulation and flight tests were principally obtained from subjective commentary. Overall, the pilots preferred the display format aligned with the velocity vector.
NASA Technical Reports Server (NTRS)
Ray, Ronald J.
1994-01-01
New flight test maneuvers and analysis techniques for evaluating the dynamic response of in-flight thrust models during throttle transients have been developed and validated. The approach is based on the aircraft and engine performance relationship between thrust and drag. Two flight test maneuvers, a throttle step and a throttle frequency sweep, were developed and used in the study. Graphical analysis techniques, including a frequency domain analysis method, were also developed and evaluated. They provide quantitative and qualitative results. Four thrust calculation methods were used to demonstrate and validate the test technique. Flight test applications on two high-performance aircraft confirmed the test methods as valid and accurate. These maneuvers and analysis techniques were easy to implement and use. Flight test results indicate the analysis techniques can identify the combined effects of model error and instrumentation response limitations on the calculated thrust value. The methods developed in this report provide an accurate approach for evaluating, validating, or comparing thrust calculation methods for dynamic flight applications.
STS-103 Crew at Breakfast, Suiting, Departing O&C
NASA Technical Reports Server (NTRS)
1999-01-01
The Hubble Space Telescope (HST) team is preparing for NASA's third scheduled service call to Hubble. This mission, STS-103, will launch from Kennedy Space Center aboard the Space Shuttle Discovery. The seven flight crew members for STS-103 are: Commander Curtis L. Brown (his sixth flight), Pilot Scott J. Kelly and European Space Agency (ESA) astronaut Jean-Francois Clervoy (his third flight) will join space walkers Steven L. Smith (his third flight), C. Michael Foale (his fifth flight), John M. Grunsfeld (his third flight) and ESA astronaut Claude Nicollier (his fourth flight). This current video presents a live footage of the seven STS-103 crewmembers eating breakfast, suiting, and departing the O&C (Operations and Checkout) before the 6:50 p.m. lift-off.
Commercial Orbital Transportation Services (COTS) Demonstrations
NASA Technical Reports Server (NTRS)
Lindenmoyer, Allan
2006-01-01
U.S. space policy directs pursuit of commercial opportunities for providing transportation and other services low Earth orbit and beyond. COTS Project established to implement policy. COTS strategy: Phase 1) Assist industry with system development/demonstrations (COTS Demos); Phase 2) Procure commercial services for ISS logistics support. COTS Demonstrations competition completed in 10 months. Two industry partners selected for funded Space Act Agreements: 1) SpaceX & Rocketplane-Kistler; and 2) Unfunded Space Act Agreements in work with other competitors. COTS budget of $500 M thru 2010, with pay for performance milestone approach. Cargo flight demonstrations planned for 2008 and 2009: Crew flight demonstration options for 2011-2012. Commercial cargo transportation services potentially available as early as 2009-2010. Successful COTS partners may open new space markets and provide reliable, cost effective cargo and crew transportation services, a new era for commercial space.
STS-57 MS2 Sherlock operates RMS THC on OV-105's aft flight deck
NASA Technical Reports Server (NTRS)
1993-01-01
STS-57 Mission Specialist 2 (MS2) Nancy J. Sherlock operates the remote manipulator system (RMS) translation hand control (THC) while observing extravehicular activity (EVA) outside viewing window W10 on the aft flight deck of Endeavour, Orbiter Vehicle (OV) 105. Positioned at the onorbit station, Sherlock moved EVA astronauts in the payload bay (PLB). Payload Commander (PLC) G. David Low with his feet anchored to a special restraint device on the end of the RMS arm held MS3 Peter J.K. Wisoff during the RMS maneuvers. The activity represented an evaluation of techniques which might be used on planned future missions -- a 1993 servicing visit to the Hubble Space Telescope (HST) and later space station work -- which will require astronauts to frequently lift objects of similar sized bulk. Note: Just below Sherlock's left hand a 'GUMBY' toy watches the actvity.
NASA's Commercial Crew Program, The Next Step in U.S. Space Transportation
NASA Technical Reports Server (NTRS)
Mango, Edward J.; Thomas, Rayelle E.
2013-01-01
The Commercial Crew Program (CCP) is leading NASA's efforts to develop the next U.S. capability for crew transportation and rescue services to and from the International Space Station (ISS) by the mid-decade timeframe. The outcome of this capability is expected to stimulate and expand the U.S. space transportation industry. NASA is relying on its decades of human space flight experience to certify U.S. crewed vehicles to the ISS and is doing so in a two phase certification approach. NASA Certification will cover all aspects of a crew transportation system, including development, test, evaluation, and verification; program management and control; flight readiness certification; launch, landing, recovery, and mission operations; sustaining engineering and maintenance/upgrades. To ensure NASA crew safety, NASA Certification will validate technical and performance requirements, verify compliance with NASA requirements, validate the crew transportation system operates in appropriate environments, and quantify residual risks.
Advanced flight hardware for organic separations
NASA Astrophysics Data System (ADS)
Deuser, Mark S.; Vellinger, John C.; Weber, John T.
1997-01-01
Aqueous Two-Phase Partitioning (ATPP) is a unique separation technique which allows purification and classification of biological materials. SHOT has employed the ATPP process in separation equipment developed for both space and ground applications. Initial equipment development and research focused on the ORganic SEParation (ORSEP) space flight experiments that were performed on suborbital rockets and the shuttle. ADvanced SEParations (ADSEP) technology was developed as the next generation of ORSEP equipment through a NASA Small Business Innovation Research (SBIR) contract. Under the SBIR contract, a marketing study was conducted, indicating a growing commercial market exists among biotechnology firms for ADSEP equipment and associated flight research and development services. SHOT is preparing to begin manufacturing and marketing laboratory versions of the ADSEP hardware for the ground-based market. In addition, through a self-financed SBIR Phase III effort, SHOT fabricated and integrated the ADSEP flight hardware for a commercially-driven flight experiment as the initial step in marketing space processing services. The ADSEP ground-based and microgravity research is expected to play a vital role in developing important new biomedical and pharmaceutical products.
Preparation and evaluation of Apollo 14 composite experiments
NASA Technical Reports Server (NTRS)
Steurer, W. H.; Kaye, S.
1971-01-01
An account is given of the work aimed at flight experiments on Apollo 14, in relation to space manufacturing processes. Evaluation of suitable materials, definition of in-flight processing procedures, preparation of preprocessed materials and delivery, and evaluation of the space-processed samples after return from the Apollo 14 flight are presented.
The NASA Lewis integrated propulsion and flight control simulator
NASA Technical Reports Server (NTRS)
Bright, Michelle M.; Simon, Donald L.
1991-01-01
A new flight simulation facility was developed at NASA-Lewis. The purpose of this flight simulator is to allow integrated propulsion control and flight control algorithm development and evaluation in real time. As a preliminary check of the simulator facility capabilities and correct integration of its components, the control design and physics models for a short take-off and vertical landing fighter aircraft model were shown, with their associated system integration and architecture, pilot vehicle interfaces, and display symbology. The initial testing and evaluation results show that this fixed based flight simulator can provide real time feedback and display of both airframe and propulsion variables for validation of integrated flight and propulsion control systems. Additionally, through the use of this flight simulator, various control design methodologies and cockpit mechanizations can be tested and evaluated in a real time environment.
Navigation Operational Concept,
1991-08-01
Area Control Facility AFSS Automated Flight Service Station AGL Above Ground Level ALSF-2 Approach Light System with Sequence Flasher Model 2 ATC Air...equipment contributes less than 0.30 NM error at the missed approach point. This total system use accuracy allows for flight technical error of up to...means for transition from instrument to visual flight . This function is provided by a series of standard lighting systems : the Approach Lighting
1989-01-01
Mid * Advanced Propulsion System Far * Rotor Burst Protection Reports Mid 11.4 Flight Safety / * Aircraft Icing Handbook Near Atmospheric Hazards...with operating the national aviation system include air traffic controllers, flight service specialists, maintenance technicians, safety inspectors...address the design and certification of flight deck systems and revised crew training requirements. In FY 1988, studies of safety data were initiated to
2016-01-01
tenance period to achieve planned expected service life ( ESL ), as well as the length, workload, and periodicity of a continuous maintenance...a ship’s service life but extends the length of each deployment. Figure 2.1 compares the number of deployments that can be made over the ESL of...ships in different cycle lengths. The ESL of DDG-51 Arleigh Burke–class destroyers Flight I and II is 35 years, and Flight IIA has an ESL of 40 years
2006-08-10
NASA's F-15B testbed aircraft in flight during the first evaluation flight of the joint NASA/Gulfstream Quiet Spike project. The project seeks to verify the structural integrity of the multi-segmented, articulating spike attachment designed to reduce and control a sonic boom.
A benchmark for fault tolerant flight control evaluation
NASA Astrophysics Data System (ADS)
Smaili, H.; Breeman, J.; Lombaerts, T.; Stroosma, O.
2013-12-01
A large transport aircraft simulation benchmark (REconfigurable COntrol for Vehicle Emergency Return - RECOVER) has been developed within the GARTEUR (Group for Aeronautical Research and Technology in Europe) Flight Mechanics Action Group 16 (FM-AG(16)) on Fault Tolerant Control (2004 2008) for the integrated evaluation of fault detection and identification (FDI) and reconfigurable flight control strategies. The benchmark includes a suitable set of assessment criteria and failure cases, based on reconstructed accident scenarios, to assess the potential of new adaptive control strategies to improve aircraft survivability. The application of reconstruction and modeling techniques, based on accident flight data, has resulted in high-fidelity nonlinear aircraft and fault models to evaluate new Fault Tolerant Flight Control (FTFC) concepts and their real-time performance to accommodate in-flight failures.
2011-07-01
ISS028-E-013758 (1 July 2011) --- Russian cosmonauts Sergei Volkov, Expedition 28 flight engineer; and Andrey Borisenko (mostly out of frame at left), commander, perform in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.
Integrated Resilient Aircraft Control Project Full Scale Flight Validation
NASA Technical Reports Server (NTRS)
Bosworth, John T.
2009-01-01
Objective: Provide validation of adaptive control law concepts through full scale flight evaluation. Technical Approach: a) Engage failure mode - destabilizing or frozen surface. b) Perform formation flight and air-to-air tracking tasks. Evaluate adaptive algorithm: a) Stability metrics. b) Model following metrics. Full scale flight testing provides an ability to validate different adaptive flight control approaches. Full scale flight testing adds credence to NASA's research efforts. A sustained research effort is required to remove the road blocks and provide adaptive control as a viable design solution for increased aircraft resilience.
[Roles and functions of military flight nursing: aeromedical evacuation].
Lee, Chun-Lan; Hsiao, Yun-Chien; Chen, Chao-Yen
2012-06-01
Evacuating the injured is an important part of disaster medicine. Aircraft provide timely access to distant and remote areas and, in an emergency, can evacuate sick or injured individuals in such areas quickly and safely for critical treatment elsewhere. Aeromedical evacuation (AE) comprises the two categories of fixed-wing ambulance service and helicopter emergency medical service (HEMS). Each aims to accomplish unique objectives. In Taiwan, the Second Taiwan Strait Crisis in 1958 established the unique role and functions of medical flight nursing. Significant knowledge and experience has been accumulated in the field since that time in such areas as the effects of high altitude environments on individuals and equipment; physiological, psychological, social and spiritual factors that affect the injured and / or response team members; and emergency care delivery techniques. All have been essential elements in the development and delivery of comprehensive medical flight nurse training. Medical flight nursing belongs in a special professional category, as nurses must master knowledge on general and special-case casualty evacuation procedures, relevant instruments and equipment, triage, in-flight medical care, and aircraft loading requirements related to transporting the sick and injured. The internationalization of medical care has opened the potential to expand medical flight nursing roles and functions into disaster nursing. Although military considerations continue to frame medical flight nursing training and preparation today, the authors feel that creating strategic alliances with disaster nursing specialists and organizations overseas is a future developmental direction for Taiwan's medical flight nursing sector worth formal consideration.
NASA Technical Reports Server (NTRS)
Jordan, Thomas L.; Bailey, Roger M.
2008-01-01
As part of the Airborne Subscale Transport Aircraft Research (AirSTAR) project, NASA Langley Research Center (LaRC) has developed a subscaled flying testbed in order to conduct research experiments in support of the goals of NASA s Aviation Safety Program. This research capability consists of three distinct components. The first of these is the research aircraft, of which there are several in the AirSTAR stable. These aircraft range from a dynamically-scaled, twin turbine vehicle to a propeller driven, off-the-shelf airframe. Each of these airframes carves out its own niche in the research test program. All of the airplanes have sophisticated on-board data acquisition and actuation systems, recording, telemetering, processing, and/or receiving data from research control systems. The second piece of the testbed is the ground facilities, which encompass the hardware and software infrastructure necessary to provide comprehensive support services for conducting flight research using the subscale aircraft, including: subsystem development, integrated testing, remote piloting of the subscale aircraft, telemetry processing, experimental flight control law implementation and evaluation, flight simulation, data recording/archiving, and communications. The ground facilities are comprised of two major components: (1) The Base Research Station (BRS), a LaRC laboratory facility for system development, testing and data analysis, and (2) The Mobile Operations Station (MOS), a self-contained, motorized vehicle serving as a mobile research command/operations center, functionally equivalent to the BRS, capable of deployment to remote sites for supporting flight tests. The third piece of the testbed is the test facility itself. Research flights carried out by the AirSTAR team are conducted at NASA Wallops Flight Facility (WFF) on the Eastern Shore of Virginia. The UAV Island runway is a 50 x 1500 paved runway that lies within restricted airspace at Wallops Flight Facility. The facility provides all the necessary infrastructure to conduct the research flights in a safe and efficient manner. This paper gives a comprehensive overview of the development of the AirSTAR testbed.
2011-08-31
CAPE CANAVERAL, Fla. -- Volunteers, portraying their individual roles, stand beside a NASA Fire Rescue Services vehicle and a Huey II helicopter in support of the aviation safety exercise during Emergency Response Safety Training at the Shuttle Landing Facility, Runway 33, at NASA’s Kennedy Space Center in Florida. The simulated helicopter mishap exercise was conducted to evaluate emergency response and mishap investigations of aircraft at Kennedy. Participants included Air Rescue Fire Fighters, Flight Operations, Disaster Preparedness, Security, and Safety. NASA mandates simulated aviation safety training take place every two years. Photo credit: NASA/Kim Shiflett
Using radar to advance migratory bird management: An interagency collaboration
Sojda, R.; Ruth, J.M.; Barrow, W.C.; Dawson, D.K.; Diehl, R.H.; Manville, A.; Green, M.T.; Krueper, D.J.; Johnston, S.
2005-01-01
Migratory birds face many changes to the landscapes they traverse and the habitats they use. Wind turbines and communications towers, which pose hazards to birds and bats in flight, are being erected across the United States and offshore. Human activities can also destroy or threaten habitats critical to birds during migratory passage, and climate change appears to be altering migratory patterns. The U.S. Fish and Wildlife Service (USFWS) and other agencies are under increasing pressure to identify and evaluate movement patterns and habitats used during migration and other times.
Western Aeronautical Test Range
NASA Technical Reports Server (NTRS)
Sakahara, Robert D.
2008-01-01
This viewgraph presentation reviews the work of the Western Aeronautical Test Range (WATR). NASA's Western Aeronautical Test Range is a network of facilities used to support aeronautical research, science missions, exploration system concepts, and space operations. The WATR resides at NASA's Dryden Flight Research Center located at Edwards Air Force Base, California. The WATR is a part of NASA's Corporate Management of Aeronautical Facilities and funded by the Strategic Capability Asset Program (SCAP). Maps show the general location of the WATR area that is used for aeronautical testing and evaluation. The products, services and facilities of WATR are discussed,
Code of Federal Regulations, 2010 CFR
2010-01-01
... White Sands, Goddard Space Flight Center (GSFC), and Johnson Space Center (JSC). (5) A weekly user...-launch support planning and documentation. (9) Scheduling user services via TDRSS. (10) Access to...
Code of Federal Regulations, 2012 CFR
2012-01-01
... White Sands, Goddard Space Flight Center (GSFC), and Johnson Space Center (JSC). (5) A weekly user...-launch support planning and documentation. (9) Scheduling user services via TDRSS. (10) Access to...
Code of Federal Regulations, 2011 CFR
2011-01-01
... White Sands, Goddard Space Flight Center (GSFC), and Johnson Space Center (JSC). (5) A weekly user...-launch support planning and documentation. (9) Scheduling user services via TDRSS. (10) Access to...
The Effect of Corporate Influence in the Short Haul Business Travel Market
NASA Technical Reports Server (NTRS)
Mason, Keith J.
1999-01-01
The importance of corporate involvement in the decision making process for business related air travel is being increasingly recognized in the literature. Business travellers consume air services (i.e. they take airline flights), however; they may not be the principal decision-maker in the purchase, Also it is the organization that employs the traveller that incurs the cost for air travel, Consequently this research addresses the relationship between the traveller and the employing organization in the purchase of air travel. In this paper traveller opinions on their corporate travel policy are evaluated using a Likert summated rating scale. The benefits sought, by the traveller, from the air service are also investigated and these benefits are used to segment the short haul business air travel market in the EU. Changes in the market for short haul business travel since the full liberalisation of the aviation market in the EU are evaluated by comparing the data to an earlier study of similar travellers in 1992.
The Effect of Corporate Influence in the Short Haul Business Travel Market
NASA Technical Reports Server (NTRS)
Mason, Keith J.
1999-01-01
The importance of corporate involvement in the decision making process for business related air travel is being increasingly recognised in the literature. Business travellers consume air services (i.e. they take airline flights), however; they may not be the principal decision-maker in the purchase. Also it is the organization that employs the traveller that incurs die cost for air travel. Consequently this research addresses the relationship between the traveller and the employing organisation in the purchase of air travel. In this paper traveller opinions on their corporate travel policy are evaluated using a Likert summated rating scale. The benefits sought, by the traveller, from the air service are also investigated and these benefits are used to segment the short haul business air travel market in the EU. Changes in the market for short haul business travel since the full liberalisation of the aviation market in-the EU are evaluated by comparing the data to an earlier study of similar travellers in 1992.
F-16XL ship #1 (#849) during first flight of the Digital Flight Control System (DFCS)
NASA Technical Reports Server (NTRS)
1997-01-01
After completing its first flight with the Digital Flight Control System on December 16, 1997, the F-16XL #1 aircraft began a series of envelope expansion flights. On January 27 and 29, 1998, it successfully completed structural clearance tests, as well as most of the load testing Only flights at Mach 1.05 at 10,000 feet, Mach 1.1 at 15,000 feet, and Mach 1.2 at 20,000 feet remained. During the next flight, on February 4, an instrumentation problem cut short the planned envelope expansion tests. After the problem was corrected, the F-16XL returned to flight status, and on February 18 and 20, flight control and evaluation flights were made. Two more research flights were planned for the following week, but another problem appeared. During the ground start up, project personnel noticed that the leading edge flap moved without being commanded. The Digital Flight Control Computer was sent to the Lockheed-Martin facility at Fort Worth, where the problem was traced to a defective chip in the computer. After it was replaced, the F-16XL #1 flew a highly successful flight controls and handling qualities evaluation flight on March 26, clearing the way for the final tests. The final limited loads expansion flight occurred on March 31, and was fully successful. As a result, the on-site Lockheed-Martin loads engineer cleared the aircraft to Mach 1.8. The remaining two handling qualities and flight control evaluation flights were both made on April 3, 1998. These three flights concluded the flight test portion of the DFCS upgrade.
Hubble Space Telescope Fine Guidance Sensor Post-Flight Bearing Inspection
NASA Technical Reports Server (NTRS)
Pellicciotti, Joseph; Loewenthal, Stu; Jones, William, Jr.; Jumper, Mike
2004-01-01
Aerospace mechanism engineering success stories often, if not always, consist of overcoming developmental, test and flight anomalies. Many times it is these anomalies that stimulate technology growth and more reliable future systems. However, one must learn from these to achieve an ultimately successful mission. It is not often that a spacecraft engineer is able to inspect hardware that has flown in orbit for several years. However, in February 1997, the Fine Guidance Sensor-I (FGS-1) was removed from the Hubble Space Telescope (HST) and returned to NASA Goddard Space Flight Center (GSFC) during the second Servicing Mission (SM2). At the time of removal, FGS-1 had nearly 7 years of service and the bearings in the Star Selector Servos (SSS) had accumulated approximately 25 million Coarse Track (CT) cycles. The main reason for its replacement was due to a bearing torque anomaly leading to stalling of the B Star Selector Servo (SSS-B) when reversing direction during a vehicle offset maneuver, referred to herein as a Reversal Bump (RB). The returned HST FGS SSS bearings were disassembled for post-service condition assessment to better understand the actual cause of the torque spikes, identify potential process/design improvements, and provide information for remedial on-orbit operation modifications. The methods and technology utilized for this inspection are not unique to this system and can be adapted to most investigation ai varying stages of the mechanism life from development, through testing, io post night evaluation. The systematic methods used for the HST Fine Guidance Sensor (FGS) SSS and specific findings are the subjects presented in this paper. The lessons learned include the importance of cleanliness and handling for precision instrument bearings and the potential effects from contamination. The paper describes in detail, the analytical techniques used for the SSS and their importance in this investigation. Inspection analytical data and photographs are included throughout the paper.
2008-07-21
CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the protective wrapping has been removed from the Flight Support System for the Hubble Space Telescope revealing the soft capture mechanism , or SCM. The SCM will be permanently attached to Hubble’s aft shroud by spacewalking astronauts and will provide a rendezvous and docking target that can be easily seen and recognized by a docking vehicle. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller
Flight program language requirements. Volume 2: Requirements and evaluations
NASA Technical Reports Server (NTRS)
1972-01-01
The efforts and results are summarized for a study to establish requirements for a flight programming language for future onboard computer applications. Several different languages were available as potential candidates for future NASA flight programming efforts. The study centered around an evaluation of the four most pertinent existing aerospace languages. Evaluation criteria were established, and selected kernels from the current Saturn 5 and Skylab flight programs were used as benchmark problems for sample coding. An independent review of the language specifications incorporated anticipated future programming requirements into the evaluation. A set of detailed language requirements was synthesized from these activities. The details of program language requirements and of the language evaluations are described.
Collaborative Arrival Planning: Data Sharing and User Preference Tools
NASA Technical Reports Server (NTRS)
Zelenka, Richard E.; Edwards, Thomas A. (Technical Monitor)
1998-01-01
Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.
Solar-terrestrial Predictions Proceedings. Volume 1: Prediction Group Reports
NASA Technical Reports Server (NTRS)
Donnelly, R. F. (Editor)
1979-01-01
The current practice in solar terrestrial predictions is reviewed with emphasis of prediction, warning, and monitoring services. Topics covered include: ionosphere-reflected HF radio propagation; radiation hazards for manned space flights and high altitude and high latitude aircraft flights; and geomagnetic activity.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Flight Stability § 25.171 General. The airplane must be.... In addition, suitable stability and control feel (static stability) is required in any condition normally encountered in service, if flight tests show it is necessary for safe operation. [Doc. No. 5066...
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Flight Stability § 25.171 General. The airplane must be.... In addition, suitable stability and control feel (static stability) is required in any condition normally encountered in service, if flight tests show it is necessary for safe operation. [Doc. No. 5066...
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Flight Stability § 23.171 General....181. In addition, the airplane must show suitable stability and control “feel” (static stability) in any condition normally encountered in service, if flight tests show it is necessary for safe operation. ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Flight Stability § 23.171 General....181. In addition, the airplane must show suitable stability and control “feel” (static stability) in any condition normally encountered in service, if flight tests show it is necessary for safe operation. ...
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Flight Stability § 25.171 General. The airplane must be.... In addition, suitable stability and control feel (static stability) is required in any condition normally encountered in service, if flight tests show it is necessary for safe operation. [Doc. No. 5066...
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Flight Stability § 23.171 General....181. In addition, the airplane must show suitable stability and control “feel” (static stability) in any condition normally encountered in service, if flight tests show it is necessary for safe operation. ...
14 CFR 234.11 - Disclosure to consumers.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...
14 CFR 234.11 - Disclosure to consumers.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...
14 CFR 234.11 - Disclosure to consumers.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...
14 CFR 234.11 - Disclosure to consumers.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...
14 CFR 135.415 - Service difficulty reports.
Code of Federal Regulations, 2014 CFR
2014-01-01
...; (4) An exhaust system that causes damage during flight to the engine, adjacent structure, equipment... or aircraft structure occurs; (8) Engine shutdown during flight due to foreign object ingestion or... structure that requires major repair; (15) Cracks, permanent deformation, or corrosion of aircraft...
14 CFR 135.415 - Service difficulty reports.
Code of Federal Regulations, 2013 CFR
2013-01-01
...; (4) An exhaust system that causes damage during flight to the engine, adjacent structure, equipment... or aircraft structure occurs; (8) Engine shutdown during flight due to foreign object ingestion or... structure that requires major repair; (15) Cracks, permanent deformation, or corrosion of aircraft...
14 CFR 135.415 - Service difficulty reports.
Code of Federal Regulations, 2012 CFR
2012-01-01
...; (4) An exhaust system that causes damage during flight to the engine, adjacent structure, equipment... or aircraft structure occurs; (8) Engine shutdown during flight due to foreign object ingestion or... structure that requires major repair; (15) Cracks, permanent deformation, or corrosion of aircraft...
The Impact of Flight Hardware Scavenging on Space Logistics
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.
2011-01-01
For a given fixed launch vehicle capacity the logistics payload delivered to the moon may be only roughly 20 percent of the payload delivered to the International Space Station (ISS). This is compounded by the much lower flight frequency to the moon and thus low availability of spares for maintenance. This implies that lunar hardware is much more scarce and more costly per kilogram than ISS and thus there is much more incentive to preserve hardware. The Constellation Lunar Surface System (LSS) program is considering ways of utilizing hardware scavenged from vehicles including the Altair lunar lander. In general, the hardware will have only had a matter of hours of operation yet there may be years of operational life remaining. By scavenging this hardware the program, in effect, is treating vehicle hardware as part of the payload. Flight hardware may provide logistics spares for system maintenance and reduce the overall logistics footprint. This hardware has a wide array of potential applications including expanding the power infrastructure, and exploiting in-situ resources. Scavenging can also be seen as a way of recovering the value of, literally, billions of dollars worth of hardware that would normally be discarded. Scavenging flight hardware adds operational complexity and steps must be taken to augment the crew s capability with robotics, capabilities embedded in flight hardware itself, and external processes. New embedded technologies are needed to make hardware more serviceable and scavengable. Process technologies are needed to extract hardware, evaluate hardware, reconfigure or repair hardware, and reintegrate it into new applications. This paper also illustrates how scavenging can be used to drive down the cost of the overall program by exploiting the intrinsic value of otherwise discarded flight hardware.