Sample records for flight service performance

  1. Safety Versus Passenger Service: The Flight Attendants’ Dilemma

    PubMed Central

    Damos, Diane L.; Boyett, Kimberly S.; Gibbs, Patt

    2013-01-01

    After 9/11, new security duties were instituted at many U.S. air carriers and existing safety and security duties received increased emphasis. Concurrently, in-flight services were changed and in many cases, cabin crews were reduced. This article examines the post-9/11 conflict between passenger service and the timely performance of safety and security duties at 1 major U.S. air carrier. In-flight data were obtained on both international and domestic flights. The data suggest that the prompt performance of the safety and security duties is adversely affected by the number of service duties occurring in the later part of both international and domestic flights. PMID:23667300

  2. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 5: Flight service and inspection

    NASA Technical Reports Server (NTRS)

    Kizer, J. A.

    1981-01-01

    Inspections of the C-130 composite-reinforced center wings were conducted over the flight service monitoring period of more than six years. Twelve inspections were conducted on each of the two C-130H airplanes having composite reinforced center wing boxes. Each inspection consisted of visual and ultrasonic inspection of the selective boron-epoxy reinforced center wings which included the inspection of the boron-epoxy laminates and the boron-epoxy reinforcement/aluminum structure adhesive bondlines. During the flight service monitoring period, the two C-130H aircraft accumulated more than 10,000 flight hours and no defects were detected in the inspections over this period. The successful performance of the C-130H aircraft with composite-reinforced center wings allowed the transfer of the responsibilities of inspecting and maintaining these two aircraft to the U. S. Air Force.

  3. Novitskiy performs in-flight maintenance on the TVIS

    NASA Image and Video Library

    2013-01-23

    ISS034-E-033549 (23 Jan. 2013) --- Russian cosmonaut Oleg Novitskiy, Expedition 34 flight engineer, performs routine in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  4. Flight service environmental effects on composite materials and structures

    NASA Technical Reports Server (NTRS)

    Dexter, H. Benson; Baker, Donald J.

    1992-01-01

    NASA Langley and the U.S. Army have jointly sponsored programs to assess the effects of realistic flight environments and ground-based exposure on advanced composite materials and structures. Composite secondary structural components were initially installed on commercial transport aircraft in 1973; secondary and primary structural components were installed on commercial helicopters in 1979; and primary structural components were installed on commercial aircraft in the mid-to-late 1980's. Service performance, maintenance characteristics, and residual strength of numerous components are reported. In addition to data on flight components, 10 year ground exposure test results on material coupons are reported. Comparison between ground and flight environmental effects for several composite material systems are also presented. Test results indicate excellent in-service performance with the composite components during the 15 year period. Good correlation between ground-based material performance and operational structural performance has been achieved.

  5. The Flight Service Station Training Program : 1981-1985.

    DOT National Transportation Integrated Search

    1986-06-01

    This report describes the performance of the ATC classes in the Flight Service Station Training Program 1981 to 1985 on the skills tests and laboratory exercises in Preflight (pilot briefing), Inflight, and Emergency Services. Over 80% of the final g...

  6. Long-term environmental effects and flight service evaluation of composite materials

    NASA Technical Reports Server (NTRS)

    Dexter, H. Benson

    1987-01-01

    Results of a NASA-Langley sponsored research program to establish the long term effects of realistic flight environments and ground based exposure on advanced composite materials are presented. The effects of moisture, ultraviolet radiation, aircraft fuels and fluids, sustained stress, and fatigue loading are reported. Residual strength and stiffness as a function of exposure time and exposure location are reported for seven different material systems after 10 years of worldwide outdoor exposure. Flight service results of over 300 composite components installed on rotorcraft and transport aircraft are included. Over 4 million total component flight hours were accumulated on various aircraft since initiation of flight service in 1973. Service performance, maintenance characteristics, and residual strength of numerous composite components installed on commercial and military aircraft are reported as a function of flight hours and years in service. Residual strength test results of graphite/epoxy spoilers with 10 years of worldwide service and over 28,000 flight hours are reported.

  7. Tyurin and Voss perform maintenance on the TVIS treadmill in the Service Module

    NASA Image and Video Library

    2001-08-19

    ISS003-E-5200 (19 August 2001) --- Cosmonaut Mikhail Tyurin (left), Expedition Three flight engineer representing Rosaviakosmos, and astronaut James S. Voss, Expedition Two flight engineer, perform maintenance in the Zvezda Service Module on the International Space Station (ISS). This image was taken with a digital still camera.

  8. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009818 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  9. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009857 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  10. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009840 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  11. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009856 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  12. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009819 (23 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  13. 75 FR 21716 - Agency Information Collection; Activity Under OMB Review; Airline Service Quality Performance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... large certificated air carriers to file ``On-Time Flight Performance Reports'' and ``Mishandled-Baggage... On-Time Flight Performance Reports to identify problem areas within the air traffic control system... concerning their chances of on-time flights and the rate of mishandled baggage by the 18 largest scheduled...

  14. Performance retention of the RB211 powerplant in service

    NASA Technical Reports Server (NTRS)

    Astridge, B. L.; Pinder, J. T.

    1981-01-01

    An understanding of the mechanisms of deterioration is essential in order that features to counteract performance degradation can be built into the basic design of an engine and nacelle. Furthermore, the interpretation must be continued in service for effective feedback to provide modifications which may be necessary in maintaining a satisfactory performance retention program. The in service assessment must be accurate as to magnitude and causes and this requires consideration of: (1) the powerplant as a complete entity, i.e., the engine components and nacelle including the thrust reverser; (2) measurement of performance in flight rather than by sole reliance on the scaling of test cell data to flight conditions (although some correlation should be possible); and (3) the relationship of engine parts condition to overhaul performance and in flight deterioration level of that engine. These aspects are addressed by consideration of the RB211 engine in service in both the Lockheed L1011 Tristar and Boeing 747 aircraft.

  15. Wakata with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009824 (23 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  16. Wakata with TVIS in Service module

    NASA Image and Video Library

    2009-04-23

    ISS019-E-009853 (23 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  17. Chiao performs in-flight maintenance on the TVIS in the SM during Expedition 10

    NASA Image and Video Library

    2005-02-15

    ISS010-E-17815 (15 February 2005) --- Cosmonaut Salizhan S. Sharipov, Expedition 10 flight engineer representing Russia's Federal Space Agency, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station (ISS).

  18. Williams with TVIS hardware in Zvezda Service module

    NASA Image and Video Library

    2007-02-26

    ISS014-E-15136 (26 Feb. 2007) --- Astronaut Sunita L. Williams, Expedition 14 flight engineer, performs maintenance work on the Treadmill Vibration Isolation System (TVIS) during routine in-flight maintenance (IFM) in the Zvezda Service Module of the International Space Station.

  19. Flight service evaluation of Kevlar-49/epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1977-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after three years' service, and found to be performing satisfactorily. There are six Kevlar-49 panels on each aircraft, including sandwich and solid laminate wing-body panels, and 150 C service aft engine fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.

  20. Simulated airline service experience with laminar-flow control leading-edge systems

    NASA Technical Reports Server (NTRS)

    Maddalon, Dal V.; Fisher, David F.; Jennett, Lisa A.; Fischer, Michael C.

    1987-01-01

    The first JetStar leading edge flight test was made November 30, 1983. The JetStar was flown for more than 3 years. The titanium leading edge test articles today remain in virtually the same condition as they were in on that first flight. No degradation of laminar flow performance has occurred as a result of service. The JetStar simulated airline service flights have demonstrated that effective, practical leading edge systems are available for future commercial transports. Specific conclusions based on the results of the simulated airline service test program are summarized.

  1. Chamitoff performs maintenance on the TVIS during Expedition 17

    NASA Image and Video Library

    2008-08-12

    ISS017-E-012864 (12 Aug. 2008) --- NASA astronaut Greg Chamitoff, Expedition 17 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  2. The space station assembly phase: Flight telerobotic servicer feasibility. Volume 2: Methodology and case study

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyamfi, Max A.; Volkmer, Kent; Zimmerman, Wayne F.

    1987-01-01

    A methodology is described for examining the feasibility of a Flight Telerobotic Servicer (FTS) using two assembly scenarios, defined at the EVA task level, for the 30 shuttle flights (beginning with MB-1) over a four-year period. Performing all EVA tasks by crew only is compared to a scenario in which crew EVA is augmented by FTS. A reference FTS concept is used as a technology baseline and life-cycle cost analysis is performed to highlight cost tradeoffs. The methodology, procedure, and data used to complete the analysis are documented in detail.

  3. Dexterous Orbital Servicing System (DOSS)

    NASA Technical Reports Server (NTRS)

    Price, Charles R.; Berka, Reginald B.; Chladek, John T.

    1994-01-01

    The Dexterous Orbiter Servicing System (DOSS) is a dexterous robotic spaceflight system that is based on the manipulator designed as part of the Flight Telerobotics Servicer program for the Space Station Freedom and built during a 'technology capture' effort that was commissioned when the FTS was cancelled from the Space Station Freedom program. The FTS technology capture effort yielded one flight manipulator and the 1 g hydraulic simulator that had been designed as an integrated test tool and crew trainer. The DOSS concept was developed to satisfy needs of the telerobotics research community, the space shuttle, and the space station. As a flight testbed, DOSS would serve as a baseline reference for testing the performance of advanced telerobotics and intelligent robotics components. For shuttle, the DOSS, configured as a movable dexterous tool, would be used to provide operational flexibility for payload operations and contingency operations. As a risk mitigation flight demonstration, the DOSS would serve the International Space Station to characterize the end to end system performance of the Special Purpose Dexterous Manipulator performing assembly and maintenance tasks with actual ISSA orbital replacement units. Currently, the most likely entrance of the DOSS into spaceflight is a risk mitigation flight experiment for the International Space Station.

  4. Space Station flight telerobotic servicer functional requirements development

    NASA Technical Reports Server (NTRS)

    Oberright, John; Mccain, Harry; Whitman, Ruth I.

    1987-01-01

    The Space Station flight telerobotic servicer (FTS), a flight robotic system for use on the first Space Station launch, is described. The objectives of the FTS program include: (1) the provision of an alternative crew EVA by supporting the crew in assembly, maintenance, and servicing activities, and (2) the improvement of crew safety by performing hazardous tasks such as spacecraft refueling or thermal and power system maintenance. The NASA/NBS Standard Reference Model provides the generic, hierarchical, structured functional control definition for the system. It is capable of accommodating additional degrees of machine intelligence in the future.

  5. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1980-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 6 years' service. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.

  6. Barrett during TVIS maintenance

    NASA Image and Video Library

    2009-04-21

    ISS019-E-008750 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  7. Barrett during TVIS maintenance

    NASA Image and Video Library

    2009-04-21

    ISS019-E-008752 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  8. Barrett during TVIS maintenance

    NASA Image and Video Library

    2009-04-21

    ISS019-E-008767 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  9. Barrett during TVIS maintenance

    NASA Image and Video Library

    2009-04-21

    ISS019-E-008764 (21 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  10. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1982-01-01

    Kevlar-49 fairing panels, installed as flight service components on three l-1011's, were inspected after 8 years service. The fairings had accumulated a total of 62,000 hours, with one ship set having 20,850 hours service. Kevlar-49 components were found to be performing satisfactorily in service with no major problems. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structures.

  11. Flight Avionics Sequencing Telemetry (FAST) DIV Latching Display

    NASA Technical Reports Server (NTRS)

    Moore, Charlotte

    2010-01-01

    The NASA Engineering (NE) Directorate at Kennedy Space Center provides engineering services to major programs such as: Space Shuttle, Inter national Space Station, and the Launch Services Program (LSP). The Av ionics Division within NE, provides avionics and flight control syste ms engineering support to LSP. The Launch Services Program is respons ible for procuring safe and reliable services for transporting critical, one of a kind, NASA payloads into orbit. As a result, engineers mu st monitor critical flight events during countdown and launch to asse ss anomalous behavior or any unexpected occurrence. The goal of this project is to take a tailored Systems Engineering approach to design, develop, and test Iris telemetry displays. The Flight Avionics Sequen cing Telemetry Delta-IV (FAST-D4) displays will provide NASA with an improved flight event monitoring tool to evaluate launch vehicle heal th and performance during system-level ground testing and flight. Flight events monitored will include data from the Redundant Inertial Fli ght Control Assembly (RIFCA) flight computer and launch vehicle comma nd feedback data. When a flight event occurs, the flight event is ill uminated on the display. This will enable NASA Engineers to monitor c ritical flight events on the day of launch. Completion of this project requires rudimentary knowledge of launch vehicle Guidance, Navigatio n, and Control (GN&C) systems, telemetry, and console operation. Work locations for the project include the engineering office, NASA telem etry laboratory, and Delta launch sites.

  12. JT9D engine diagnostics. Task 2: Feasibility study of measuring in-service flight loads. [747 aircraft performance

    NASA Technical Reports Server (NTRS)

    Kafka, P. G.; Skibo, M. A.; White, J. L.

    1977-01-01

    The feasibility of measuring JT9D propulsion system flight inertia loads on a 747 airplane is studied. Flight loads background is discussed including the current status of 747/JT9D loads knowledge. An instrumentation and test plan is formulated for an airline-owned in-service airplane and the Boeing-owned RA001 test airplane. Technical and cost comparisons are made between these two options. An overall technical feasibility evaluation is made and a cost summary presented. Conclusions and recommendations are presented in regard to using existing inertia loads data versus conducting a flight test to measure inertia loads.

  13. 14 CFR Sec. 19-4 - Service classes.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a composite of first class, coach, and mixed passenger/cargo service. The following classifications... integral part of services performed pursuant to published flight schedules. The following classifications... Classifications Sec. 19-4 Service classes. The statistical classifications are designed to reflect the operating...

  14. 14 CFR Sec. 19-4 - Service classes.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... a composite of first class, coach, and mixed passenger/cargo service. The following classifications... integral part of services performed pursuant to published flight schedules. The following classifications... Classifications Sec. 19-4 Service classes. The statistical classifications are designed to reflect the operating...

  15. STS-82 Discovery Launch

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Discovery cuts a bright swath through the early-morning darkness as it lifts off from Launch Pad 39A on a scheduled 10-day flight to service the Hubble Space Telescope (HST). Liftoff of Mission STS-82 occurred on-time at 3:55:17 a.m. EST, Feb. 11, 1997. Leading the veteran crew is Mission Commander Kenneth D. Bowersox. Scott J. 'Doc' Horowitz is the pilot. Mark C. Lee is the payload commander. Rounding out the seven-member crew are Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. 'Joe' Tanner and Steven A. Hawley. Four of the astronauts will be divided into two teams to perform the scheduled four back-to-back extravehicular activities (EVAs) or spacewalks. Lee and Smith will team up for EVAs 1 and 3 on flight days 4 and 6; Harbaugh and Tanner will perform EVAs 2 and 4 on flight days 5 and 7. Among the tasks will be to replace two outdated scientific instruments with two new instruments the Space Telescope Imaging Spectrograph (STIS) and the Near Infrared Camera and Multi-Object Spectrometer (NICMOS). This is the second servicing mission for HST, which was originally deployed in 1990 and designed to be serviced on-orbit about every three years. Hubble was first serviced in 1993. STS-82 is the second of eight planned flights in 1997. It is the 22nd flight of Discovery and the 82nd Shuttle mission.

  16. Wakata during TVIS maintenance

    NASA Image and Video Library

    2009-04-21

    ISS019-E-008758 (21 April 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  17. The JT9D Jet Engine Diagnostics Program

    NASA Technical Reports Server (NTRS)

    Olsson, W. J.

    1982-01-01

    The various engine deterioration phenomena that affect JT9D performance retention were studied, and approaches to improve performance retention of engines were identified. The program included surveys of historical data, monitoring of in service engines, ground and flight testing of instrumented engines, analysis, and analytical modeling. Performance deterioration is made up of both short and long term modes, both of which are flight cycle related phenomena. Short term deterioration occurs primarily during airplane acceptance testing prior to delivery to the airline. This effect is caused by flight load and power induced clearance closures and engine deflections with resulting rubbing of airfoils and seals. Long term deterioration is caused by erosion of airfoils and gas path seals during ground operation and take off and by cyclic induced thermal distortion of the high pressure turbine airfoils. Studies of possible remedial approaches have shown that performance retention within 1 to 2 percent of initial revenue service performance can be achieved with a proper program of hot section and cold section maintenance.

  18. Eyharts performs TVIS maintenance

    NASA Image and Video Library

    2008-03-03

    ISS016-E-030559 (4 March 2008) --- European Space Agency (ESA) astronaut Leopold Eyharts, Expedition 16 flight engineer, works with the Treadmill Vibration Isolation System (TVIS) removed from the Zvezda Service Module floor during in-flight maintenance (IFM) on the International Space Station.

  19. TVIS Inflight Maintenance

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013758 (1 July 2011) --- Russian cosmonauts Sergei Volkov, Expedition 28 flight engineer; and Andrey Borisenko (mostly out of frame at left), commander, perform in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  20. Legacy of Operational Space Medicine During the Space Shuttle Program

    NASA Technical Reports Server (NTRS)

    Stepaniakm, P.; Gilmore, S.; Johnston, S.; Chandler, M.; Beven, G.

    2011-01-01

    The Johnson Space Center s Medical Science Division branches were involved in preparing astronauts for space flight during the 30 year period of the Space Shuttle Program. These branches included the Flight Medicine Clinic, Medical Operations and the Behavioral Health Program. The components of each facet of these support services were: the Flight Medicine Clinic s medical selection process and medical care; the Medical Operations equipment, training, procedures and emergency medical services; and the Behavioral Health and Performance operations. Each presenter will discuss the evolution of its operations, implementations, lessons learned and recommendations for future vehicles and short duration space missions.

  1. A design of 30/20 GHz flight communications experiment for NASA. [satellite and earth segments for high data rate commercial service

    NASA Technical Reports Server (NTRS)

    Kawamoto, Y.

    1982-01-01

    The objective of the 30/20 GHz Flight Experiment System is to develop the required technology and to experiment with the communication technique for an operational communication satellite system. The system uses polarization, spatial, and frequency isolations to maximize the spectrum utilization. The key spacecraft technologies required for the concept are the scan beam antenna, the baseband processor, the IF switch matrix, TWTA, SSPA, and LNA. The spacecraft communication payload information will be telemetered and monitored closely so that these technologies and performances can be verified. Two types of services, a trunk service and a customer premise service, are demonstrated in the system. Many experiments associated with these services, such as synchronization, demand assignment, link control, and network control will be performed to provide important information on the operational aspect of the system.

  2. 14 CFR 234.11 - Disclosure to consumers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...

  3. 14 CFR 234.11 - Disclosure to consumers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...

  4. 14 CFR 234.11 - Disclosure to consumers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...

  5. 14 CFR 234.11 - Disclosure to consumers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... (b) For each domestic flight for which schedule information is available on its Web site, including domestic code-share flights, a reporting carrier shall display the following information regarding the...) ECONOMIC REGULATIONS AIRLINE SERVICE QUALITY PERFORMANCE REPORTS § 234.11 Disclosure to consumers. (a...

  6. Flight service evaluation of composite components on Bell 206L and Sikorsky S-76 helicopters

    NASA Technical Reports Server (NTRS)

    Baker, D. J.

    1983-01-01

    Progress on two programs to evaluate composite structural components in flight service on commercial helicopters is described. Thirty-six ship sets of composite components that include the litter door, baggage door, forward fairing, and vertical fin were installed on Bell Model 206L helicopters that are operating in widely different climatic areas. Four horizontal stabilizers and ten tail rotor spars that are production components on the S-76 helicopter were tested after prescribed periods of service to determine the effects of the operating environment on their performance. Concurrent with the flight evaluation, specimens from materials used to fabricate the components were exposed in ground racks and tested at specified intervals to determine the effects of outdoor environments. Results achieved from 14,000 hours of accumulated service on the 206L components, tests on a S-76 horizontal stabilizer after 1600 hours of service, tests on a S-76 tail rotor spar after 2300 hours service, and two years of ground based exposure of material coupons are reported.

  7. Development and in-flight performance of the Mariner 9 spacecraft propulsion system

    NASA Technical Reports Server (NTRS)

    Evans, D. D.; Cannova, R. D.; Cork, M. J.

    1972-01-01

    On November 14, 1971, Mariner 9 was decelerated into orbit about Mars by a 1334-newton (300-lbf) liquid bipropellant propulsion system. The development and in-flight performance are described and summarized of this pressure-fed, nitrogen tetroxide/monomethyl hydrazine bipropellant system. The design of all Mariner propulsion subsystems has been predicated upon the premise that simplicity of approach, coupled with thorough qualification and margin-limits testing, is the key to cost-effective reliability. The qualification test program and analytical modeling of the Mariner 9 subsystem are discussed. Since the propulsion subsystem is modular in nature, it was completely checked, serviced, and tested independent of the spacecraft. Proper prediction of in-flight performance required the development of three significant modeling tools to predict and account for nitrogen saturation of the propellant during the six-month coast period and to predict and statistically analyze in-flight data. The flight performance of the subsystem was excellent, as were the performance prediction correlations. These correlations are presented.

  8. Flight service evaluation of kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft: Flight service report

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1981-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 7 years service. There are six Kevlar-49 panels on each aircraft: a left hand and right hand set of a wing-body sandwich fairing; a slid laminate under-wing fillet panel; and a 422 K service aft engine fairing. The three L-1011s include one each in service with Eastern, Air Canada, and TWA. The fairings have accumulated a total of 52,500 hours, with one ship set having 17.700 hours service. The inspections were conducted at the airlines' major maintenance bases with the participation of Lockheed Engineering. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems or any condition requiring corrective action. The only defects noted were minor impact damage and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.

  9. Performance deterioration based on in-service engine data: JT9D jet engine diagnostics program

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.

    1979-01-01

    Results of analyses of engine performance deterioration trends and levels with respect to service usage are presented. Thirty-two JT9D-7A engines were selected for this purpose. The selection of this engine fleet provided the opportunity of obtaining engine performance data starting before the first flight through initial service such that the trend and levels of engine deterioration related to both short and long term deterioration could be more carefully defined. The performance data collected and analyzed included in-flight, on wing (ground), and test stand prerepair and postrepair performance calibrations with expanded instrumentation where feasible. The results of the analyses of these data were used to: (1) close gaps in previously obtained historical data as well as augment the historical data with more carefully obtained data; (2) refine preliminary models of performance deterioration with respect to usage; (3) establish an understanding of the relationships between ground and altitude performance deterioration trends; (4) refine preliminary recommendations concerning means to reduce and control deterioration; and (5) identify areas where additional effort is required to develop an understanding of complex deterioration issues.

  10. TDRSS Onboard Navigation System (TONS) flight qualification experiment

    NASA Technical Reports Server (NTRS)

    Gramling, C. J.; Hart, R. C.; Folta, D. C.; Long, A. C.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

  11. Kaleri prepares for a data collection / exercise session on the TVIS in the SM during Expedition 8

    NASA Image and Video Library

    2003-11-23

    ISS008-E-05964 (23 November 2003) --- Cosmonaut Alexander Y. Kaleri, Expedition 8 flight engineer, performs in-flight maintenance (IFM) on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Kaleri represents Rosaviakosmos.

  12. Performance deterioration due to acceptance testing and flight loads; JT90 jet engine diagnostic program

    NASA Technical Reports Server (NTRS)

    Olsson, W. J.

    1982-01-01

    The results of a flight loads test of the JT9D-7 engine are presented. The goals of this test program were to: measure aerodynamic and inertia loads on the engine during flight, explore the effects of airplane gross weight and typical maneuvers on these flight loads, simultaneously measure the changes in engine running clearances and performance resulting from the maneuvers, make refinements of engine performance deterioration prediction models based on analytical results of the tests, and make recommendations to improve propulsion system performance retention. The test program included a typical production airplane acceptance test plus additional flights and maneuvers to encompass the range of flight loads in revenue service. The test results indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-indicated that aerodynamic loads, primarily at take-off, were the major cause of rub-induced deterioration in the cold sectin of the engine. Differential thermal expansion between rotating and static parts plus aerodynamic loads combined to cause blade-to-seal rubs in the turbine.

  13. Flight service evaluation of composite helicopter components

    NASA Technical Reports Server (NTRS)

    Mardoian, George H.; Ezzo, Maureen B.

    1994-01-01

    This paper presents the results of a NASA funded contract and Sikorsky research and development programs to evaluate structural composite components in flight service on Sikorsky Model S-76 helicopters. Selected components were removed and tested at prescribed intervals over a nine year time frame. Four horizontal stabilizers and thirteen tail rotor spars were returned from commercial service in West Palm Beach, Florida and in the Gulf Coast region of Louisiana to determine the long term effects of operations in hot and humid climates on component performance. Concurrent with the flight component evaluation, panels of materials used in their fabrication were exposed to the environment in ground racks. Selected panels were tested annually to determine the effects of exposure on physical and mechanical properties. The results of 55,741 component flight hours and 911 months of field exposure are reported and compared with initial Federal Aviation Administration (FAA) certification data. The findings of this program have provided increased confidence in the long term durability of advanced composite materials used in helicopter structural applications.

  14. Recommended fine positioning test for the Development Test Flight (DTF-1) of the NASA Flight Telerobotic Servicer (FTS)

    NASA Technical Reports Server (NTRS)

    Dagalakis, N.; Wavering, A. J.; Spidaliere, P.

    1991-01-01

    Test procedures are proposed for the NASA DTF (Development Test Flight)-1 positioning tests of the FTS (Flight Telerobotic Servicer). The unique problems associated with the DTF-1 mission are discussed, standard robot performance tests and terminology are reviewed and a very detailed description of flight-like testing and analysis is presented. The major technical problem associated with DTF-1 is that only one position sensor can be used, which will be fixed at one location, with a working volume which is probably smaller than some of the robot errors to be measured. Radiation heating of the arm and the sensor could also cause distortions that would interfere with the test. Two robot performance testing committees have established standard testing procedures relevant to the DTF-1. Due to the technical problems associated with DTF-1, these procedures cannot be applied directly. These standard tests call for the use of several test positions at specific locations. Only one position, that of the position sensor, can be used by DTF-1. Off-line programming accuracy might be impossible to measure and in that case it will have to be replaced by forward kinetics accuracy.

  15. Collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation

    NASA Astrophysics Data System (ADS)

    Yang, Shangwen; Guo, Baohua; Xiao, Xuefei; Gao, Haichao

    2018-01-01

    To allocate the en-routes and slots to the flights with collaborative decision making, a collaborative en-route and slot allocation algorithm based on fuzzy comprehensive evaluation was proposed. Evaluation indexes include flight delay costs, delay time and the number of turning points. Analytic hierarchy process is applied to determining index weights. Remark set for current two flights not yet obtained the en-route and slot in flight schedule is established. Then, fuzzy comprehensive evaluation is performed, and the en-route and slot for the current two flights are determined. Continue selecting the flight not yet obtained an en-route and a slot in flight schedule. Perform fuzzy comprehensive evaluation until all flights have obtained the en-routes and slots. MatlabR2007b was applied to numerical test based on the simulated data of a civil en-route. Test results show that, compared with the traditional strategy of first come first service, the algorithm gains better effect. The effectiveness of the algorithm was verified.

  16. 77 FR 18306 - Agency Information Collection; Activity Under OMB Review; Airline Service Quality Performance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... DEPARTMENT OF TRANSPORTATION Research & Innovative Technology Administration [Docket ID No. RITA... Performance AGENCY: Research & Innovative Technology Administration (RITA), Bureau of Transportation... travelers information concerning the on-time performance history of flights that they are considering...

  17. Definition of technology development missions for early space station satellite servicing, volume 1

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The testbed role of an early manned space station in the context of a satellite servicing evolutionary development and flight demonstration technology plan which results in a satellite servicing operational capability is defined. A satellite servicing technology development mission (a set of missions) to be performed on an early manned space station is conceptually defined.

  18. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1979-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after five years' service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 150 C (300 F) service aft engine fairing. The fairings have accumulated a total of 40,534 hours, with one ship set having 16,091 hours service as of Feb. 11, 1979. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings.

  19. Problems in air traffic management. VII., Job training performance of air traffic control specialists - measurement, structure, and prediction.

    DOT National Transportation Integrated Search

    1965-07-01

    A statistical study of training- and job-performance measures of several hundred Air Traffic Control Specialists (ATCS) representing Enroute, Terminal, and Flight Service Station specialties revealed that training-performance measures reflected: : 1....

  20. 76 FR 60090 - Performance Review Board, Senior Executive Service (SES)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-28

    ... NATIONAL AERONAUTICS AND SPACE ADMINISTRATION [Notice (11-085)] Performance Review Board, Senior... the NASA PRB and the NASA Senior Executive Committee. The latter performs this function for senior..., Marshall Space Flight Center. Director, Stennis Space Center. Senior Executive Committee Chairperson...

  1. Task network models in the prediction of workload imposed by extravehicular activities during the Hubble Space Telescope servicing mission

    NASA Technical Reports Server (NTRS)

    Diaz, Manuel F.; Takamoto, Neal; Woolford, Barbara

    1994-01-01

    In a joint effort with Brooks AFB, Texas, the Flight Crew Support Division at JSC has begun a computer simulation and performance modeling program directed at establishing the predictive validity of software tools for modeling human performance during spaceflight. This paper addresses the utility of task network modeling for predicting the workload that astronauts are likely to encounter in extravehicular activities (EVA) during the Hubble Space Telescope (HST) repair mission. The intent of the study was to determine whether two EVA crewmembers and one intravehicular activity (IVA) crewmember could reasonably be expected to complete HST Wide Field/Planetary Camera (WFPC) replacement in the allotted time. Ultimately, examination of the points during HST servicing that may result in excessive workload will lead to recommendations to the HST Flight Systems and Servicing Project concerning (1) expectation of degraded performance, (2) the need to change task allocation across crewmembers, (3) the need to expand the timeline, and (4) the need to increase the number of EVA's.

  2. STS-61 Space Shuttle mission report

    NASA Technical Reports Server (NTRS)

    Fricke, Robert W., Jr.

    1994-01-01

    The STS-61 Space Shuttle Program Mission Report summarizes the Hubble Space Telescope (HST) servicing mission as well as the Orbiter, External Tank (ET), Solid Rocket Booster (SRB), Redesigned Solid Rocket Motor (RSRM), and the Space Shuttle main engine (SSME) systems performance during the fifty-ninth flight of the Space Shuttle Program and fifth flight of the Orbiter vehicle Endeavour (OV-105). In addition to the Orbiter, the flight vehicle consisted of an ET designated as ET-60; three SSME's which were designated as serial numbers 2019, 2033, and 2017 in positions 1, 2, and 3, respectively; and two SRB's which were designated BI-063. The RSRM's that were installed in each SRB were designated as 360L023A (lightweight) for the left SRB, and 360L023B (lightweight) for the right SRB. This STS-61 Space Shuttle Program Mission Report fulfills the Space Shuttle Program requirement as documented in NSTS 07700, Volume 8, Appendix E. That document requires that each major organizational element supporting the Program report the results of its hardware evaluation and mission performance plus identify all related in-flight anomalies. The primary objective of the STS-61 mission was to perform the first on-orbit servicing of the Hubble Space Telescope. The servicing tasks included the installation of new solar arrays, replacement of the Wide Field/Planetary Camera I (WF/PC I) with WF/PC II, replacement of the High Speed Photometer (HSP) with the Corrective Optics Space Telescope Axial Replacement (COSTAR), replacement of rate sensing units (RSU's) and electronic control units (ECU's), installation of new magnetic sensing systems and fuse plugs, and the repair of the Goddard High Resolution Spectrometer (GHRS). Secondary objectives were to perform the requirements of the IMAX Cargo Bay Camera (ICBC), the IMAX Camera, and the Air Force Maui Optical Site (AMOS) Calibration Test.

  3. 75 FR 41920 - Agency Information Collection; Activity Under OMB Review; Airline Service Quality Performance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... and analyze air traffic delays. Wheels-up and wheels-down times are used in conjunction with departure and arrival times to show the extent of ground delays. Actual elapsed flight time, wheels-down minus wheels- up time, is compared to scheduled elapsed flight time to identify airborne delays. The reporting...

  4. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1978-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after four years' service, and found to be performing satisfactorily. The Kevlar-49 components were all found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. A concurrent investigation was conducted on Kevlar-49/epoxy coupons exposed to an outdoor environment over a three year period at various locations providing a variety of climatic conditions. Weight changes and retention of mechanical properties were determined after one and three years exposure. A net weight loss occurred due to ultraviolet effects on the unpainted specimens. Mechanical property retentions were satisfactory with most specimens retaining well over 80% of their original value.

  5. Flight service evaluation of PRD-49/epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Wooley, J. H.

    1974-01-01

    Fairing panels were fabricated to evaluate the fabrication characteristics and flight service performance of PRD-49 (Kevlar-49) a composite reinforcing material and to compare it with the fiberglass which is currently in use. Panel configurations were selected to evaluate the PRD-49 with two resin matrix materials in sandwich and solid laminate construction. Left and right hand versions of these configurations were installed on L-1011's which will accumulate approximately 3000 flight hours per year per aircraft. The direct substitution of PRD-49 for fiberglass produced a twenty-six percent weight reduction on the panel configurations. Examination of these panels revealed that there was no visible difference between the PRD-49 and adjacent fiberglass panels.

  6. Evaluation of cloud detection instruments and performance of laminar-flow leading-edge test articles during NASA Leading-Edge Flight-Test Program

    NASA Technical Reports Server (NTRS)

    Davis, Richard E.; Maddalon, Dal V.; Wagner, Richard D.; Fisher, David F.; Young, Ronald

    1989-01-01

    Summary evaluations of the performance of laminar-flow control (LFC) leading edge test articles on a NASA JetStar aircraft are presented. Statistics, presented for the test articles' performance in haze and cloud situations, as well as in clear air, show a significant effect of cloud particle concentrations on the extent of laminar flow. The cloud particle environment was monitored by two instruments, a cloud particle spectrometer (Knollenberg probe) and a charging patch. Both instruments are evaluated as diagnostic aids for avoiding laminar-flow detrimental particle concentrations in future LFC aircraft operations. The data base covers 19 flights in the simulated airline service phase of the NASA Leading-Edge Flight-Test (LEFT) Program.

  7. Development and in-flight performance of the Mariner 9 spacecraft propulsion system

    NASA Technical Reports Server (NTRS)

    Evans, D. D.; Cannova, R. D.; Cork, M. J.

    1973-01-01

    On November 14, 1971, Mariner 9 was decelerated into orbit about Mars by a 1334 N (300 lbf) liquid bipropellant propulsion system. This paper describes and summarizes the development and in-flight performance of this pressure-fed, nitrogen tetroxide/monomethyl hydrazine bipropellant system. The design of all Mariner propulsion subsystems has been predicted upon the premise that simplicity of approach, coupled with thorough qualification and margin-limits testing, is the key to cost-effective reliability. The qualification test program and analytical modeling are also discussed. Since the propulsion subsystem is modular in nature, it was completely checked, serviced, and tested independent of the spacecraft. Proper prediction of in-flight performance required the development of three significant modeling tools to predict and account for nitrogen saturation of the propellant during the six-month coast period and to predict and statistically analyze in-flight data.

  8. Program for establishing long-time flight service performance of composite materials in the center wing structure of C-130 aircraft. Phase 1: Advanced development

    NASA Technical Reports Server (NTRS)

    Harvill, W. E.; Kays, A. O.; Young, E. C.; Mcgee, W. M.

    1972-01-01

    Areas where selective reinforcement of conventional metallic structure can improve static strength/fatigue endurance at lower weight than would be possible if metal reinforcement were used are discussed. These advantages are now being demonstrated by design, fabrication, and tests of three boron-epoxy reinforced C-130E center wing boxes. This structural component was previously redesigned using an aluminum build-up to meet increased severity of fatigue loadings. Direct comparisons of relative structural weights, manufacturing costs, and producibility can therefore be obtained, and the long-time flight service performance of the composite reinforced structure can be evaluated against the wide background of metal reinforced structure.

  9. Commercial Orbital Transportation Services (COTS) Demonstrations

    NASA Technical Reports Server (NTRS)

    Lindenmoyer, Allan

    2006-01-01

    U.S. space policy directs pursuit of commercial opportunities for providing transportation and other services low Earth orbit and beyond. COTS Project established to implement policy. COTS strategy: Phase 1) Assist industry with system development/demonstrations (COTS Demos); Phase 2) Procure commercial services for ISS logistics support. COTS Demonstrations competition completed in 10 months. Two industry partners selected for funded Space Act Agreements: 1) SpaceX & Rocketplane-Kistler; and 2) Unfunded Space Act Agreements in work with other competitors. COTS budget of $500 M thru 2010, with pay for performance milestone approach. Cargo flight demonstrations planned for 2008 and 2009: Crew flight demonstration options for 2011-2012. Commercial cargo transportation services potentially available as early as 2009-2010. Successful COTS partners may open new space markets and provide reliable, cost effective cargo and crew transportation services, a new era for commercial space.

  10. Volkov performs maintenance on the TVIS during Expedition 17

    NASA Image and Video Library

    2008-08-12

    ISS017-E-012861 (12 Aug. 2008) --- Russian Federal Space Agency cosmonaut Sergei Volkov, Expedition 17 commander, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  11. Operational behavioral health and performance resources for international space station crews and families

    NASA Technical Reports Server (NTRS)

    Sipes, Walter E.; Vander Ark, Stephen T.

    2005-01-01

    The Behavioral Health and Performance Section (BHP) at NASA Johnson Space Center provides direct and indirect psychological services to the International Space Station (ISS) astronauts and their families. Beginning with the NASA-Mir Program, services available to the crews and families have gradually expanded as experience is gained in long-duration flight. Enhancements to the overall BHP program have been shaped by crewmembers' personal preferences, family requests, specific events during the missions, programmatic requirements, and other lessons learned. The BHP program focuses its work on four areas: operational psychology, behavioral medicine, human-to-system interface, and sleep and circadian. Within these areas of focus are psychological and psychiatric screening for astronaut selection as well as many resources that are available to the crewmembers, families, and other groups such as crew surgeon and various levels of management within NASA. Services include: preflight, in flight, and postflight preparation; training and support; resources from a Family Support Office; in-flight monitoring; clinical care for astronauts and their families; and expertise in the workload and work/rest scheduling of crews on the ISS. Each of the four operational areas is summarized, as are future directions for the BHP program.

  12. 14 CFR 121.550 - Secret Service Agents: Admission to flight deck.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...

  13. 14 CFR 121.550 - Secret Service Agents: Admission to flight deck.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...

  14. 14 CFR 121.550 - Secret Service Agents: Admission to flight deck.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...

  15. 14 CFR 121.550 - Secret Service Agents: Admission to flight deck.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...

  16. 14 CFR 121.550 - Secret Service Agents: Admission to flight deck.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Secret Service Agents: Admission to flight... OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Flight Operations § 121.550 Secret Service Agents: Admission to flight deck. Whenever an Agent of the Secret Service who is assigned the duty...

  17. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodies commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1983-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 9 years of service. There are six Kevlar-49 panels on each aircraft: a left hand and right hand set of a wing body sandwich fairing; a solid laminate under wing fillet panel; and a 422 K (300 F) service aft engine fairing. The fairings have accumulated a total of 70,000 hours, with one ship set having over 24,000 hours service. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history to date indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.

  18. 77 FR 33808 - Agency Information Collection; Activity Under OMB Review: Airline Service Quality Performance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... Administration uses Part 234 data to pinpoint and analyze air traffic delays. Wheels-up and wheels-down times are... elapsed flight time, wheels-down minus wheels- up time, is compared to scheduled elapsed flight time to... the air network, which enables the FAA to study the ripple effects of delays at hub airports. The data...

  19. PZEh-MO-8/Body Mass Measurement in Service Module

    NASA Image and Video Library

    2009-05-06

    ISS019-E-014222 (6 May 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, uses the IM mass measurement device to perform the PZEh-MO-8/Body Mass Measurement Russian biomedical routine assessments in the Zvezda Service Module of the International Space Station.

  20. PZEh-MO-8/Body Mass Measurement in Service Module

    NASA Image and Video Library

    2009-05-06

    ISS019-E-014216 (6 May 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 19/20 flight engineer, uses the IM mass measurement device to perform the PZEh-MO-8/Body Mass Measurement Russian biomedical routine assessments in the Zvezda Service Module of the International Space Station.

  1. The space station assembly phase: Flight telerobotic servicer feasibility, volume 1

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyamfi, Max A.; Volkmer, Kent; Zimmerman, Wayne F.

    1987-01-01

    The question is addressed which was raised by the Critical Evaluation Task Force (CETF) analysis of the space station: if a Flight Telerobotic Servicer (FTS) of a given technical risk could be built for use during space station assembly, could it save significant extravehicular (EVA) resources. Key issues and trade-offs associated with using an FTS to aid in space station assembly phase tasks such as construction and servicing are identified. A methodology is presented that incorporates assessment of candidate assembly phase tasks, telerobotics performance capabilities, development costs, operational constraints (STS and proximity operations), maintenance, attached payloads, and polar platforms. A discussion of the issues is presented with focus on potential FTS roles: (1) as a research-oriented test bed to learn more about space usage of telerobotics; (2) as a research-based test bed with an experimental demonstration orientation and limited assembly and servicing applications; or (3) as an operational system to augment EVA, to aid the construction of the space station, and to reduce the programmatic (schedule) risk by increasing the flexibility of mission operations. During the course of the study, the baseline configuration was modified into Phase 1 (a station assembled in 12 flights), and Phase 2 (a station assembled over a 30 flight period) configuration.

  2. Census of U.S. Civil Aircraft: Calendar Year 1987

    DTIC Science & Technology

    1987-12-31

    CCair dba Piedmont Commuter 7 --- --- . 7 ,I --- {-. --.-- Chalks International 2 --- - - --- Challenge Air Cargo 2 2 2 --- - --- Com m a nd A ...the Civil Aeronautics Board *’.’ authorizing the performance of scheduled service over specified routes, and a limited amount of nonscheduled service...specify the times, days of the weeks and plans between which such flights are performed . o Supplemental air carrier--One of a class of air carriers now

  3. The flight telerobotic servicer and technology transfer

    NASA Technical Reports Server (NTRS)

    Andary, James F.; Bradford, Kayland Z.

    1991-01-01

    The Flight Telerobotic Servicer (FTS) project at the Goddard Space Flight Center is developing an advanced telerobotic system to assist in and reduce crew extravehicular activity (EVA) for Space Station Freedom (SSF). The FTS will provide a telerobotic capability in the early phases of the SSF program and will be employed for assembly, maintenance, and inspection applications. The current state of space technology and the general nature of the FTS tasks dictate that the FTS be designed with sophisticated teleoperational capabilities for its internal primary operating mode. However, technologies such as advanced computer vision and autonomous planning techniques would greatly enhance the FTS capabilities to perform autonomously in less structured work environments. Another objective of the FTS program is to accelerate technology transfer from research to U.S. industry.

  4. [New possibilities in emergency medical transportation and emergency services of Polish Medical Air Rescue].

    PubMed

    Gałazkowski, Robert

    2010-01-01

    In Poland, two types of medical services are accomplished by the Medical Air Rescue (MAR) operating all over the country: emergency transport from the incident scene to hospital and inter-hospital transport. Helicopters or planes are used for this purpose. In 2009, helicopters performed 4359 flights to incidents and 1537 inter-hospital transports whereas planes performed 589 inter-hospital ambulance and 196 rescue flights. MAR operates from 17 bases of the Helicopter Emergency Medical Service (HEMS) and one airbase. Helicopters are mainly used when medical transport is emergent, within the operational region of a given base whereas planes when the distance between the present and target airports exceeds 250 km. In 2008, new modern aircraft were introduced to HEMS-helicopters EC 135. They fulfil all requirements of air transport regulations and are adjusted to visual (VFR) and instrumental (IFR) flights rules, at day and night. The medical cabin of EC 135 is ergonomic and functional considering the majority of rescue activities under life-saving circumstances. It is equipped with ventilator, defibrillator, infusion pumps etc. Defibrillators have 12-lead ECG, E(T)CO2, SpO2, NIBP, and IBP modules. Transport ventilators can work in a variety of ventilation modes including CMV, SIMV, SVV, BILEVEL, PCV, ASB, PPV and CPAP. The purchase of helicopters with modern avionic and medical configuration ensures high quality services of MAR for many years to come.

  5. Technicians Todd Viddle, Robert Garrett and Dan McGrath remove a servicing unit from the Space Shuttle Discovery during its post-flight processing at NASA DFRC

    NASA Image and Video Library

    2005-08-12

    Todd Viddle; APU advanced systems technician, Robert 'Skip' Garrett; main propulsion advanced systems technician, and Dan McGrath; main propulsion systems engineer technician, remove a servicing unit from the Space Shuttle Discovery as part of it's post-flight processing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items

  6. [Scoliotic spinal deformity in pilot personnel from aviation physical examination's point of view].

    PubMed

    Churilov, Iu K; Moiseev, Iu B; Imenovskiĭ, I É; Radchenko, S N

    2013-11-01

    According to results of performed examinations scoliotic spinal deformity in flight personnel has a low impact on professional health. This is proved by: oligosymptomatic course of disease - lack of complaints of pain, moderate pain, which is revealed only in case of loading tests and palpation; preservation of supporting and movement spinal function; lack of worsening of deformity during the flight service. At the same time in flight personnel suffering from scoliosis was registered a low tolerance to ergometri; robe, which point to insufficient muscle reserve of lower extremities, abdominals and dorsum. This insufficient may have an adverse effect on G-tolerance of pilots serving in maneuvering aviation. According to this fact authors came to conclusion that first-degree scoliotic deformity is of importance for expert examination of pilots of high-performance aircraft. Scoliotic deformity in pilots of other branches of aviation is of importance only in case of clinical implications (pain syndrome, restraint of movement). From there, it is not necessary to make a record in regulatory documents of flight medical board about functional-compensatory spinal deformity (first- and second degree scoliosis) in flight personnel, except flight personnel of high-performance aircraft.

  7. Analysis of legal high materials by ultra-performance liquid chromatography with time of flight mass spectrometry as part of a toxicology vigilance system: what are the most popular novel psychoactive substances in the UK?

    PubMed

    Ford, Loretta T; Berg, Jonathan D

    2017-03-01

    Introduction Legal highs also known as novel psychoactive substances mimic the effects of classic drugs of abuse. Challenges to developing screening services for novel psychoactive substances include identifying which novel psychoactive substances are available to target. Using new techniques such as exact mass time of flight can help identify common novel psychoactive substances to target for screening patient samples by routine methods such as tandem mass spectrometry. We demonstrate this strategy working in our own clinical toxicology laboratory after qualitative analysis of 98 suspect materials for novel psychoactive substances by ultra-performance liquid chromatography with time of flight mass spectrometry. Results From July 2014 to July 2015 we received 98 requests to test a range of different suspect materials for novel psychoactive substances including herbs, tobacco, liquids, pills and powders. Overall, 87% of the suspect materials tested positive for novel psychoactive substances, and 15% for controlled drugs. Three common novel psychoactive substances were present in 74% of the suspect materials: methiopropamine, a methamphetamine analogue; ethylphenidate, a cocaine mimic; and the third generation synthetic cannabinoid 5F-AKB-48. For the 55 branded products we tested only 24% of the stated contents matched exactly the compounds we detected. Conclusion Testing suspect materials using ultra-performance liquid chromatography with time of flight mass spectrometry has identified three common novel psychoactive substances in use in the UK, simplifying the development of a relevant novel psychoactive substances screening service to our population. By incorporating this into our routine liquid chromatography tandem mass spectrometry drugs of abuse screen, then offers a clinically relevant novel psychoactive substances service to our users. This strategy ensures our clinical toxicology service continues to remain effective to meet the challenges of the changing drug use in the UK.

  8. Flight service evaluation of Kevlar-49/epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1975-01-01

    Kevlar-49 fairing panels were inspected and found to be performing satisfactorily after two years flight service on an Eastern and an Air Canada L-1011. Six panels are on each aircraft including sandwich and solid laminate wing-body panels, and 300 F service aft engine fairings. Some of the panels were removed from the aircraft to permit inspection of inner surfaces and fastener hole conditions. Minor defects such as surface cracks due to impact damage, small delaminated areas, elongation and fraying of fastener holes, were noted. None of these defects were considered serious enough to warrant corrective action in the opinion of airline personnel. The defects are typical for the most part of defects noted on similar fiberglass parts.

  9. [Aviation medicine: yesterday, today and tomorrow].

    PubMed

    Iamenskov, V V; Khafizov, N N; Morozov, A V

    2011-04-01

    The article describes the history and current state of medical support of the Air Force. On December 1, 2009 Air Force Medical Service was renamed into the service of aviation medicine of Command Air Forces, and many of the functions of medical support of the Air Force transferred to the newly formed Air Force Center of Aviation Medicine. April 29, 2011 office of Aviation Medicine of the High Command of the Air Force has stepped 95-year milestone. The changes affected all structures entrusted with the issues of medical support of the Air Force. Today, the medical service of the Air Force faces challenges--ensuring safety, the study of flight conditions and their impact on health, job performance and psychological characteristics of flight personnel.

  10. Budget estimates, fiscal year 1995. Volume 1: Agency summary, human space flight, and science, aeronautics and technology

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The NASA budget request has been restructured in FY 1995 into four appropriations: human space flight; science, aeronautics, and technology; mission support; and inspector general. The human space flight appropriations provides funding for NASA's human space flight activities. This includes the on-orbit infrastructure (space station and Spacelab), transportation capability (space shuttle program, including operations, program support, and performance and safety upgrades), and the Russian cooperation program, which includes the flight activities associated with the cooperative research flights to the Russian Mir space station. These activities are funded in the following budget line items: space station, Russian cooperation, space shuttle, and payload utilization and operations. The science, aeronautics, and technology appropriations provides funding for the research and development activities of NASA. This includes funds to extend our knowledge of the earth, its space environment, and the universe and to invest in new technologies, particularly in aeronautics, to ensure the future competitiveness of the nation. These objectives are achieved through the following elements: space science, life and microgravity sciences and applications, mission to planet earth, aeronautical research and technology, advanced concepts and technology, launch services, mission communication services, and academic programs.

  11. Advanced flight hardware for organic separations

    NASA Astrophysics Data System (ADS)

    Deuser, Mark S.; Vellinger, John C.; Weber, John T.

    1997-01-01

    Aqueous Two-Phase Partitioning (ATPP) is a unique separation technique which allows purification and classification of biological materials. SHOT has employed the ATPP process in separation equipment developed for both space and ground applications. Initial equipment development and research focused on the ORganic SEParation (ORSEP) space flight experiments that were performed on suborbital rockets and the shuttle. ADvanced SEParations (ADSEP) technology was developed as the next generation of ORSEP equipment through a NASA Small Business Innovation Research (SBIR) contract. Under the SBIR contract, a marketing study was conducted, indicating a growing commercial market exists among biotechnology firms for ADSEP equipment and associated flight research and development services. SHOT is preparing to begin manufacturing and marketing laboratory versions of the ADSEP hardware for the ground-based market. In addition, through a self-financed SBIR Phase III effort, SHOT fabricated and integrated the ADSEP flight hardware for a commercially-driven flight experiment as the initial step in marketing space processing services. The ADSEP ground-based and microgravity research is expected to play a vital role in developing important new biomedical and pharmaceutical products.

  12. Whitson and Treschev perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17387 (13 October 2002) --- Cosmonaut Sergei Y. Treschev (left) and astronaut Peggy A. Whitson, Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Treschev represents Rosaviakosmos.

  13. Whitson and Treschev perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17388 (13 October 2002) --- Cosmonaut Sergei Y. Treschev (left) and astronaut Peggy A. Whitson, Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Treschev represents Rosaviakosmos.

  14. Flight controller Kevin McCluney monitors STS-61 astronauts during EVA

    NASA Image and Video Library

    1993-12-04

    STS61-S-093 (5 Dec 1993) --- Flight controller Kevin McCluney monitors the televised activity of astronauts F. Story Musgrave and Jeffrey A. Hoffman. The veteran astronauts were performing the first extravehicular activity (EVA-1) of the STS-61 Hubble Space Telescope (HST) servicing mission. McCluney's duties deal with maintenance, mechanical, arm and crew systems, meaning that he and his colleagues will be exceptionally busy for the next five days. Four astronauts in alternating pairs will perform a variety of tasks on the giant telescope during that period.

  15. TVIS Inflight Maintenance

    NASA Image and Video Library

    2011-07-01

    ISS028-E-013757 (1 July 2011) --- Russian cosmonaut Andrey Borisenko, Expedition 28 commander, performs in-flight maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station.

  16. In-flight food delivery and waste collection service: the passengers’ perspective and potential improvement

    NASA Astrophysics Data System (ADS)

    Romli, F. I.; Rahman, K. Abdul; Ishak, F. D.

    2016-10-01

    Increased competition in the commercial air transportation industry has made service quality of the airlines as one of the key competitive measures to attract passengers against their rivals. In-flight services, particularly food delivery and waste collection, have a notable impact on perception of the overall airline's service quality because they are directly and interactively provided to passengers during flight. An online public survey is conducted to explore general passengers' perception of current in-flight food delivery and waste collection services, and to identify potential rooms for improvement. The obtained survey results indicate that in-flight service does have an effect on passengers' choice of airlines. Several weaknesses of the current service method and possible improvements have been established from the collected responses.

  17. 76 FR 57635 - Restrictions on Operators Employing Former Flight Standards Service Aviation Safety Inspectors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Standards Service Aviation Safety Inspectors; Correction AGENCY: Federal Aviation Administration (FAA), DOT... ``Restrictions on Operators Employing Former Flight Standards Service Aviation Safety Inspectors'' (76 FR 52231... of, a Flight Standards Service Aviation Safety Inspector, and had direct responsibility to inspect...

  18. 14 CFR 1214.804 - Services, pricing basis, and other considerations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...

  19. 14 CFR 1214.804 - Services, pricing basis, and other considerations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...

  20. 14 CFR 1214.804 - Services, pricing basis, and other considerations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...

  1. 14 CFR 1214.804 - Services, pricing basis, and other considerations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...

  2. Esrange Space Center, a Gate to Space

    NASA Astrophysics Data System (ADS)

    Widell, Ola

    Swedish Space Corporation (SSC) is operating the Esrange Space Center in northern Sweden. Space operations have been performed for more than 40 years. We have a unique combination of maintaining balloon and rocket launch operations, and building payloads, providing space vehicles and service systems. Sub-orbital rocket flights with land recovery and short to long duration balloon flights up to weeks are offered. The geographical location, land recovery area and the long term experience makes Swedish Space Corporation and Esrange to an ideal gate for space activities. Stratospheric balloons are primarily used in supporting atmospheric research, validation of satellites and testing of space systems. Balloon operations have been carried out at Esrange since 1974. A large number of balloon flights are yearly launched in cooperation with CNES, France. Since 2005 NASA/CSBF and Esrange provide long duration balloon flights to North America. Flight durations up to 5 days with giant balloons (1.2 Million cubic metres) carrying heavy payload (up to 2500kg) with astronomical instruments has been performed. Balloons are also used as a crane for lifting space vehicles or parachute systems to be dropped and tested from high altitude. Many scientific groups both in US, Europe and Japan have indicated a great need of long duration balloon flights. Esrange will perform a technical polar circum balloon flight during the summer 2008 testing balloon systems and flight technique. We are also working on a permission giving us the opportunity on a circular stratospheric balloon flight around the North Pole.

  3. Physical Examination to Marshall Space Flight Center (MSFC) Employees

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Nurse performs tonometry examination, which measure the tension of the eyeball, during an employee's arnual physical examination given by MSFC Occupational Medicine Environmental Health Services under the Center Operations Directorate.

  4. Expanded study of feasibility of measuring in-flight 747/JT9D loads, performance, clearance, and thermal data

    NASA Technical Reports Server (NTRS)

    Sallee, G. P.; Martin, R. L.

    1980-01-01

    The JT9D jet engine exhibits a TSFC loss of about 1 percent in the initial 50 flight cycles of a new engine. These early losses are caused by seal-wear induced opening of running clearances in the engine gas path. The causes of this seal wear have been identified as flight induced loads which deflect the engine cases and rotors, causing the rotating blades to rub against the seal surfaces, producing permanent clearance changes. The real level of flight loads encountered during airplane acceptance testing and revenue service and the engine's response in the dynamic flight environment were investigated. The feasibility of direct measurement of these flight loads and their effects by concurrent measurement of 747/JT9D propulsion system aerodynamic and inertia loads and the critical engine clearance and performance changes during 747 flight and ground operations was evaluated. A number of technical options were examined in relation to the total estimated program cost to facilitate selection of the most cost effective option. It is concluded that a flight test program meeting the overall objective of determining the levels of aerodynamic and inertia load levels to which the engine is exposed during the initial flight acceptance test and normal flight maneuvers is feasible and desirable. A specific recommended flight test program, based on the evaluation of cost effectiveness, is defined.

  5. Flight-service program for advanced composite rudders on transport aircraft

    NASA Technical Reports Server (NTRS)

    1979-01-01

    Flight service experience and in-service inspection results are reported for DC-10 graphite composite rudders during the third year of airline service. Test results and status are also reported for ground-based and airborne graphite-epoxy specimens with three different epoxy resin systems to obtain moisture absorption data. Twenty graphite composite rudders were produced, nine of which were installed on commercial aircraft during the past three years. The rudders collectively accumulated 75,863 flight hours. The high time rudder accumulated 12,740 flight hours in slightly over 36 months. The graphite composite rudders were inspected visually at approximately 1000 flight hour intervals and ultrasonically at approximately 3000 flight hour intervals in accordance with in-service inspection plans. All rudders were judged acceptable for continued service as a result of these inspections. Composite moisture absorption data on small specimens, both ground-based and carried aboard three flight-service aircraft, are given. The specimens include Thornel 300 fibers in Narmco 5208 and 5209 resin systems, and Type AS fibers in the Hercules 3501-6 resin system.

  6. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  7. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  8. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  9. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  10. 14 CFR 375.50 - Transit flights; scheduled international air service operations.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... WITHIN THE UNITED STATES Transit Flights § 375.50 Transit flights; scheduled international air service operations. (a) Requirement of notice. Scheduled international air services proposed to be operated pursuant to the International Air Services Transit Agreement in transit across the United States may not be...

  11. 14 CFR § 1214.804 - Services, pricing basis, and other considerations.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... hardware). (7) Shuttle 1 and Spacelab flight planning. (8) Payload electrical power. (9) Payload... flight planning services. (15) Transmission of Spacelab data contained in the STS OI telemetry link to a... ADMINISTRATION SPACE FLIGHT Reimbursement for Spacelab Services § 1214.804 Services, pricing basis, and other...

  12. Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor

    NASA Image and Video Library

    2003-07-03

    ISS007-E-09229 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.

  13. Expedition Seven CDR Malenkenko performs IFM on Condensate Water Processor

    NASA Image and Video Library

    2003-07-03

    ISS007-E-09231 (3 July 2003) --- Cosmonaut Yuri I. Malenchenko, Expedition 7 mission commander, performs scheduled in-flight maintenance (IFM) on the condensate water processor (SRV-K2M) by removing and replacing its BKO multifiltration/purification column unit, which has reached its service life limit (450 liters min.). The old unit will be discarded on Progress. The IFM took place in the Zvezda Service Module on the International Space Station (ISS). Malenchenko represents Rosaviakosmos.

  14. TRISTAR 1: Evaluation methods for testing head-up display (HUD) flight symbology

    NASA Technical Reports Server (NTRS)

    Newman, R. L.; Haworth, L. A.; Kessler, G. K.; Eksuzian, D. J.; Ercoline, W. R.; Evans, R. H.; Hughes, T. C.; Weinstein, L. F.

    1995-01-01

    The first in a series of piloted head-up display (HUD) flight symbology studies (TRISTAR) measuring pilot task performance was conducted at the NASA Ames Research Center by the Tri-Service Flight Symbology Working Group (FSWG). Sponsored by the U.S. Army Aeroflightdynamics Directorate, this study served as a focal point for the FSWG to examine HUD test methodology and flight symbology presentations. HUD climb-dive marker dynamics and climb-dive ladder presentations were examined as pilots performed air-to-air (A/A), air-to-ground (A/G), instrument landing system (ILS), and unusual attitude (UA) recover tasks. Symbolic presentations resembled pitch ladder variations used by the U.S. Air Force (USAF), U.S. Navy (USN), and Royal Air Force (RAF). The study was initiated by the FSWG to address HUD flight symbology deficiencies, standardization, issue identification, and test methodologies. It provided the mechanism by which the USAF, USN, RAF, and USA could integrate organizational ideas and reduce differences for comparisons. Specifically it examined flight symbology issues collectively identified by each organization and the use of objective and subjective text methodology and flight tasking proposed by the FSWG.

  15. Space Shuttle Mission STS-61: Hubble Space Telescope servicing mission-01

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This press kit for the December 1993 flight of Endeavour on Space Shuttle Mission STS-61 includes a general release, cargo bay payloads and activities, in-cabin payloads, and STS-61 crew biographies. This flight will see the first in a series of planned visits to the orbiting Hubble Space Telescope (HST). The first HST servicing mission has three primary objectives: restoring the planned scientific capabilities, restoring reliability of HST systems and validating the HST on-orbit servicing concept. These objectives will be accomplished in a variety of tasks performed by the astronauts in Endeavour's cargo bay. The primary servicing task list is topped by the replacement of the spacecraft's solar arrays. The spherical aberration of the primary mirror will be compensated by the installation of the Wide Field/Planetary Camera-II and the Corrective Optics Space Telescope Axial Replacement. New gyroscopes will also be installed along with fuse plugs and electronic units.

  16. Performance standards for pass-fail determinations in the national air traffic flight service station training program.

    DOT National Transportation Integrated Search

    1979-07-01

    This report describes and documents Pass-Fail procedures for the new FSS Training Program. New types of measures and sets of norms are used to create standards of performance that students must meet to become eligible for acceptance into the operatio...

  17. Expedition Five crew perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17412 (13 October 2002) --- Cosmonaut Valery G. Korzun (left), Expedition Five mission commander, and astronaut Peggy A. Whitson, Expedition Five flight engineer, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Korzun represents Rosaviakosmos.

  18. The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center, Edwards, California

    NASA Image and Video Library

    2005-08-11

    The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.

  19. The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center, Edwards, California

    NASA Image and Video Library

    2005-08-11

    The Space Shuttle Discovery receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, August 9, 2005. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT this morning, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14 days on orbit.

  20. FTS evolution

    NASA Technical Reports Server (NTRS)

    Provost, David E.

    1990-01-01

    Viewgraphs on flight telerobotic servicer evolution are presented. Topics covered include: paths for FTS evolution; frequently performed actions; primary task states; EPS radiator panel installation; generic task definitions; path planning; non-contact alignment; contact planning and control; and human operator interface.

  1. Inflight dynamics testing of the Apollo spacecraft

    NASA Technical Reports Server (NTRS)

    Peters, W. H.; Marchantel, B.

    1972-01-01

    Response of the Apollo command module, service and lunar module airframe while in a docked configuration in the flight environment was measured in a frequency band encompassing the first two bending modes. Transfer characteristics from thrust-application point to control-system sensor were examined. The frequency and the stability margins of the first two predominant structural resonances were verified by the test. This report describes the flight test that was performed and the postflight data analysis.

  2. The NASA Dryden Flight Research Center Unmanned Aircraft System Service Capabilities

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2007-01-01

    Over 60 years of Unmanned Aircraft System (UAS) expertise at the NASA Dryden Flight Research Center are being leveraged to provide capability and expertise to the international UAS community. The DFRC brings together technical experts, UAS, and an operational environment to provide government and industry a broad capability to conduct research, perform operations, and mature systems, sensors, and regulation. The cornerstone of this effort is the acquisition of both a Global Hawk (Northrop Grumman Corporation, Los Angeles, California) and Predator B (General Atomics Aeronautical Systems, Inc., San Diego, California) unmanned aircraft system (UAS). In addition, a test range for small UAS will allow developers to conduct research and development flights without the need to obtain approval from civil authorities. Finally, experts are available to government and industry to provide safety assessments in support of operations in civil airspace. These services will allow developers to utilize limited resources to their maximum capability in a highly competitive environment.

  3. Report by the Aerospace Safety Advisory Panel

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The process of preparation for the first two shuttle flights was observed and information from both flights was gathered in order to confirm the concept and performance of the major elements of the space transportation system. To achieve truly operational operating safety, regularity, and minimum practical cost, the organization of efforts between the R&D community and any transportation service organization should be clearly separated with the latter organization assuming responsibilities for marketing its services; planning and acquiring prime hardware and spares; maintainance; certification of procedures; training; and creation of requirements for future development. A technical audit of the application of redundancy concepts to shuttle systems is suggested. The state of the art of space transportation hardware suggests that a number of concept changes may improve reliability, costs, and operational safety. For the remaining R&D flights, it is suggested that a redline audit be made of limits that should not be exceeded for ready to launch.

  4. The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center, Edwards, Calif.

    NASA Image and Video Library

    2007-06-23

    The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California, June 22, 2007. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.

  5. WFC3: In-Flight Performance Highlights

    NASA Astrophysics Data System (ADS)

    Kimble, Randy A.; MacKenty, J. W.; O'Connell, R. W.; Townsend, J. A.; WFC3 Team

    2010-01-01

    Wide Field Camera 3 (WFC3), a powerful new imager for the Hubble Space Telescope (HST), was successfully installed in the telescope in May 2009 during the first dramatic spacewalk of space shuttle flight STS-125, also known as HST Servicing Mission 4. This new camera offers unique observing capabilities in two channels spanning a broad wavelength range from the near ultraviolet to the near infrared (200-1000nm in the UV/Visible [UVIS] channel; 850-1700nm in the IR channel). After an initial outgassing period, WFC3 was cooled to its observing configuration in June. In the following months, a highly successful Servicing Mission Observatory Verification (SMOV4) program was executed, which has confirmed the exciting scientific potential of the instrument. Detailed performance results from the SMOV4 program are presented in a number of papers in this session. In this paper, we highlight some top-level performance assessments (throughput, limiting magnitudes, survey speeds) for WFC3, which is now actively engaged in the execution of forefront astronomical observing programs.

  6. SSSFD manipulator engineering using statistical experiment design techniques

    NASA Technical Reports Server (NTRS)

    Barnes, John

    1991-01-01

    The Satellite Servicer System Flight Demonstration (SSSFD) program is a series of Shuttle flights designed to verify major on-orbit satellite servicing capabilities, such as rendezvous and docking of free flyers, Orbital Replacement Unit (ORU) exchange, and fluid transfer. A major part of this system is the manipulator system that will perform the ORU exchange. The manipulator must possess adequate toolplate dexterity to maneuver a variety of EVA-type tools into position to interface with ORU fasteners, connectors, latches, and handles on the satellite, and to move workpieces and ORUs through 6 degree of freedom (dof) space from the Target Vehicle (TV) to the Support Module (SM) and back. Two cost efficient tools were combined to perform a study of robot manipulator design parameters. These tools are graphical computer simulations and Taguchi Design of Experiment methods. Using a graphics platform, an off-the-shelf robot simulation software package, and an experiment designed with Taguchi's approach, the sensitivities of various manipulator kinematic design parameters to performance characteristics are determined with minimal cost.

  7. Audiometric profile of civilian pilots according to noise exposure

    PubMed Central

    Falcão, Taiana Pacheco; Luiz, Ronir Raggio; Schütz, Gabriel Eduardo; Mello, Márcia Gomide da Silva; Câmara, Volney de Magalhães

    2014-01-01

    OBJECTIVE To evaluate the audiometric profile of civilian pilots according to the noise exposure level. METHODS This observational cross-sectional study evaluated 3,130 male civilian pilots aged between 17 and 59 years. These pilots were subjected to audiometric examinations for obtaining or revalidating the functional capacity certificate in 2011. The degree of hearing loss was classified as normal, suspected noise-induced hearing loss, and no suspected hearing loss with other associated complications. Pure-tone air-conduction audiometry was performed using supra-aural headphones and acoustic stimulus of the pure-tone type, containing tone thresholds of frequencies between 250 Hz and 6,000 Hz. The independent variables were professional categories, length of service, hours of flight, and right or left ear. The dependent variable was pilots with suspected noise-induced hearing loss. The noise exposure level was considered low/medium or high, and the latter involved periods > 5,000 flight hours and > 10 years of flight service. RESULTS A total of 29.3% pilots had suspected noise-induced hearing loss, which was bilateral in 12.8% and predominant in the left ear (23.7%). The number of pilots with suspected hearing loss increased as the noise exposure level increased. CONCLUSIONS Hearing loss in civilian pilots may be associated with noise exposure during the period of service and hours of flight. PMID:25372170

  8. 48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... Law 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...

  9. 48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...

  10. 48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...

  11. 48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...

  12. 48 CFR 237.102-71 - Limitation on service contracts for military flight simulators.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts for military flight simulators. 237.102-71 Section 237.102-71 Federal Acquisition Regulations... flight simulators. (a) Definitions. As used in this subsection— (1) Military flight simulator means any... 110-181, DoD is prohibited from entering into a service contract to acquire a military flight...

  13. Flight service evaluation of Kevlar-49 epoxy composite panels in wide-bodied commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Stone, R. H.

    1984-01-01

    Kevlar-49 fairing panels, installed as flight service components on three L-1011s, were inspected after 10 years of service. There are six Kevlar-49 panels on each aircraft: a left-hand and right-hand set of a wing-body sandwich fairing; a solid laminate under-wing fillet panel; and a 422 K (300 F) service aft engine fairing. The three L-1011s include one each in service with Eastern, Air Canada, and TWA. The fairings have accumulated a total of 79,568 hours, with one ship set having nearly 28,000 hours service. The inspections were conducted at the airlines' major maintenance bases with the participation of Lockheed Engineering. The Kevlar-49 components were found to be performing satisfactorily in service with no major problems, or any condition requiring corrective action. The only defects noted were minor impact damage, a few minor disbonds and a minor degree of fastener hole fraying and elongation. These are for the most part comparable to damage noted on fiberglass fairings. The service history obtained in this program indicates that Kevlar-49 epoxy composite materials have satisfactory service characteristics for use in aircraft secondary structure.

  14. Apollo experience report: Engineering and analysis mission support

    NASA Technical Reports Server (NTRS)

    Fricke, R. W., Jr.

    1975-01-01

    The tasks performed by the team of specialists that evaluated hardware performance during prelaunch checkout and in-flight operation are discussed. The organizational structure, operational procedures, and interfaces as well as the facilities and software required to perform these tasks are discussed. The scope of the service performed by the team and the evaluation philosophy are described. Summaries of problems and their resolution are included as appendixes.

  15. iss034e033850

    NASA Image and Video Library

    2013-01-23

    ISS034-E-033850 (23 Jan. 2013) --- Canadian Space Agency astronaut Chris Hadfield, Expedition 34 flight engineer, continues work to remove and replace the Service and Performance Checkout Unit (SPCU) Heat Exchanger inside the Quest airlock of the International Space Station.

  16. Autonomous Navigation With Ground Station One-Way Forward-Link Doppler Data

    NASA Technical Reports Server (NTRS)

    Horstkamp, G. M.; Niklewski, D. J.; Gramling, C. J.

    1996-01-01

    The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) has spent several years developing operational onboard navigation systems (ONS's) to provide real time autonomous, highly accurate navigation products for spacecraft using NASA's space and ground communication systems. The highly successful Tracking and Data Relay Satellite (TDRSS) ONS (TONS) experiment on the Explorer Platform/Extreme Ultraviolet (EP/EUV) spacecraft, launched on June 7, 1992, flight demonstrated the ONS for high accuracy navigation using TDRSS forward link communication services. In late 1994, a similar ONS experiment was performed using EP/EUV flight hardware (the ultrastable oscillator and Doppler extractor card in one of the TDRSS transponders) and ground system software to demonstrate the feasibility of using an ONS with ground station forward link communication services. This paper provides a detailed evaluation of ground station-based ONS performance of data collected over a 20 day period. The ground station ONS (GONS) experiment results are used to project the expected performance of an operational system. The GONS processes Doppler data derived from scheduled ground station forward link services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination. Analysis of the GONS experiment performance indicates that real time onboard position accuracies of better than 125 meters (1 sigma) are achievable with two or more 5-minute contacts per day for the EP/EUV 525 kilometer altitude, 28.5 degree inclination orbit. GONS accuracy is shown to be a function of the fidelity of the onboard propagation model, the frequency/geometry of the tracking contacts, and the quality of the tracking measurements. GONS provides a viable option for using autonomous navigation to reduce operational costs for upcoming spacecraft missions with moderate position accuracy requirements.

  17. The Neutron Star Interior Composition Explorer (NICER): Design and Development

    NASA Technical Reports Server (NTRS)

    Gendreau, Keith C.; Arzoumanian, Zaven; Adkins, Phillip W.; Albert, Cheryl L.; Anders, John F.; Aylward, Andrew T.; Baker, Charles L.; Balsamo, Erin R.; Bamford, William A.; Benegalrao, Suyog S.; hide

    2016-01-01

    During 2014 and 2015, NASA's Neutron star Interior Composition Explorer (NICER) mission proceeded successfully through Phase C, Design and Development. An X-ray (0.2{12 keV) astrophysics payload destined for the International Space Station, NICER is manifested for launch in early 2017 on the Commercial Resupply Services SpaceX-11 flight. Its scientific objectives are to investigate the internal structure, dynamics, and energetics of neutron stars, the densest objects in the universe. During Phase C, flight components including optics, detectors, the optical bench, pointing actuators, electronics, and others were subjected to environmental testing and integrated to form the flight payload. A custom-built facility was used to co-align and integrate the X-ray \\concentrator" optics and silicon-drift detectors. Ground calibration provided robust performance measures of the optical (at NASA's Goddard Space Flight Center) and detector (at the Massachusetts Institute of Technology) subsystems, while comprehensive functional tests prior to payload-level environmental testing met all instrument performance requirements. We describe here the implementation of NICER's major subsystems, summarize their performance and calibration, and outline the component-level testing that was successfully applied.

  18. Centaur Test Bed (CTB) for Cryogenic Fluid Management

    NASA Technical Reports Server (NTRS)

    Sakla, Steven; Kutter, Bernard; Wall, John

    2006-01-01

    Future missions such as NASA s space exploration vision and DOD satellite servicing will require significant increases in the understanding and knowledge of space based cryogenic fluid management (CFM), including the transfer and storage of cryogenic fluids. Existing CFM capabilities are based on flight of upper stage cryogenic vehicles, scientific dewars, a few dedicated flight demonstrations and ground testing. This current capability is inadequate to support development of the CEV cryogenic propulsion system, other aspects of robust space exploration or the refueling of satellite cryo propulsion systems with reasonable risk. In addition, these technologies can provide significant performance increases for missions beyond low-earth orbit to enable manned missions to the Moon and beyond. The Centaur upper-stage vehicle can provide a low cost test platform for performing numerous flight demonstrations of the full breadth of required CFM technologies to support CEV development. These flight demonstrations can be performed as secondary mission objectives using excess LH2 and/or LO2 from the main vehicle propellant tanks following primary spacecraft separation at minimal cost and risk.

  19. The Neutron star Interior Composition Explorer (NICER): design and development

    NASA Astrophysics Data System (ADS)

    Gendreau, Keith C.; Arzoumanian, Zaven; Adkins, Phillip W.; Albert, Cheryl L.; Anders, John F.; Aylward, Andrew T.; Baker, Charles L.; Balsamo, Erin R.; Bamford, William A.; Benegalrao, Suyog S.; Berry, Daniel L.; Bhalwani, Shiraz; Black, J. Kevin; Blaurock, Carl; Bronke, Ginger M.; Brown, Gary L.; Budinoff, Jason G.; Cantwell, Jeffrey D.; Cazeau, Thoniel; Chen, Philip T.; Clement, Thomas G.; Colangelo, Andrew T.; Coleman, Jerry S.; Coopersmith, Jonathan D.; Dehaven, William E.; Doty, John P.; Egan, Mark D.; Enoto, Teruaki; Fan, Terry W.; Ferro, Deneen M.; Foster, Richard; Galassi, Nicholas M.; Gallo, Luis D.; Green, Chris M.; Grosh, Dave; Ha, Kong Q.; Hasouneh, Monther A.; Heefner, Kristofer B.; Hestnes, Phyllis; Hoge, Lisa J.; Jacobs, Tawanda M.; Jørgensen, John L.; Kaiser, Michael A.; Kellogg, James W.; Kenyon, Steven J.; Koenecke, Richard G.; Kozon, Robert P.; LaMarr, Beverly; Lambertson, Mike D.; Larson, Anne M.; Lentine, Steven; Lewis, Jesse H.; Lilly, Michael G.; Liu, Kuochia Alice; Malonis, Andrew; Manthripragada, Sridhar S.; Markwardt, Craig B.; Matonak, Bryan D.; Mcginnis, Isaac E.; Miller, Roger L.; Mitchell, Alissa L.; Mitchell, Jason W.; Mohammed, Jelila S.; Monroe, Charles A.; Montt de Garcia, Kristina M.; Mulé, Peter D.; Nagao, Louis T.; Ngo, Son N.; Norris, Eric D.; Norwood, Dwight A.; Novotka, Joseph; Okajima, Takashi; Olsen, Lawrence G.; Onyeachu, Chimaobi O.; Orosco, Henry Y.; Peterson, Jacqualine R.; Pevear, Kristina N.; Pham, Karen K.; Pollard, Sue E.; Pope, John S.; Powers, Daniel F.; Powers, Charles E.; Price, Samuel R.; Prigozhin, Gregory Y.; Ramirez, Julian B.; Reid, Winston J.; Remillard, Ronald A.; Rogstad, Eric M.; Rosecrans, Glenn P.; Rowe, John N.; Sager, Jennifer A.; Sanders, Claude A.; Savadkin, Bruce; Saylor, Maxine R.; Schaeffer, Alexander F.; Schweiss, Nancy S.; Semper, Sean R.; Serlemitsos, Peter J.; Shackelford, Larry V.; Soong, Yang; Struebel, Jonathan; Vezie, Michael L.; Villasenor, Joel S.; Winternitz, Luke B.; Wofford, George I.; Wright, Michael R.; Yang, Mike Y.; Yu, Wayne H.

    2016-07-01

    During 2014 and 2015, NASA's Neutron star Interior Composition Explorer (NICER) mission proceeded success- fully through Phase C, Design and Development. An X-ray (0.2-12 keV) astrophysics payload destined for the International Space Station, NICER is manifested for launch in early 2017 on the Commercial Resupply Services SpaceX-11 flight. Its scientific objectives are to investigate the internal structure, dynamics, and energetics of neutron stars, the densest objects in the universe. During Phase C, flight components including optics, detectors, the optical bench, pointing actuators, electronics, and others were subjected to environmental testing and integrated to form the flight payload. A custom-built facility was used to co-align and integrate the X-ray "con- centrator" optics and silicon-drift detectors. Ground calibration provided robust performance measures of the optical (at NASA's Goddard Space Flight Center) and detector (at the Massachusetts Institute of Technology) subsystems, while comprehensive functional tests prior to payload-level environmental testing met all instrument performance requirements. We describe here the implementation of NICER's major subsystems, summarize their performance and calibration, and outline the component-level testing that was successfully applied.

  20. International Space Station Bacteria Filter Element Post-Flight Testing and Service Life Prediction

    NASA Technical Reports Server (NTRS)

    Perry, J. L.; von Jouanne, R. G.; Turner, E. H.

    2003-01-01

    The International Space Station uses high efficiency particulate air (HEPA) filters to remove particulate matter from the cabin atmosphere. Known as Bacteria Filter Elements (BFEs), there are 13 elements deployed on board the ISS's U.S. Segment. The pre-flight service life prediction of 1 year for the BFEs is based upon performance engineering analysis of data collected during developmental testing that used a synthetic dust challenge. While this challenge is considered reasonable and conservative from a design perspective, an understanding of the actual filter loading is required to best manage the critical ISS Program resources. Thus testing was conducted on BFEs returned from the ISS to refine the service life prediction. Results from this testing and implications to ISS resource management are discussed. Recommendations for realizing significant savings to the ISS Program are presented.

  1. Apollo experience report: Battery subsystem

    NASA Technical Reports Server (NTRS)

    Trout, J. B.

    1972-01-01

    Experience with the Apollo command service module and lunar module batteries is discussed. Significant hardware development concepts and hardware test results are summarized, and the operational performance of batteries on the Apollo 7 to 13 missions is discussed in terms of performance data, mission constraints, and basic hardware design and capability. Also, the flight performance of the Apollo battery charger is discussed. Inflight data are presented.

  2. Expedition Five crew perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17402 (13 October 2002) --- Cosmonauts Valery G. Korzun (left), Expedition Five mission commander, Sergei Y. Treschev and astronaut Peggy A. Whitson, Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Korzun and Treschev represent Rosaviakosmos.

  3. Expedition Five crew perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17390 (13 October 2002) --- Cosmonauts Valery G. Korzun (left), Expedition Five mission commander, Sergei Y. Treschev and astronaut Peggy A. Whitson, Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Korzun and Treschev represent Rosaviakosmos.

  4. Expedition Five crew perform maintenance on the TVIS

    NASA Image and Video Library

    2002-10-13

    ISS005-E-17392 (13 October 2002) --- Cosmonauts Valery G. Korzun (left), Expedition Five mission commander, Sergei Y. Treschev and astronaut Peggy A. Whitson, Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Korzun and Treschev represent Rosaviakosmos.

  5. Onufrienko and Bursch perform IFM on SM Potok air purification unit during Expedition Four

    NASA Image and Video Library

    2002-01-01

    ISS004-E-5387 (January 2002) --- Cosmonaut Yuri I. Onufrienko (right), Expedition Four mission commander, and astronaut Daniel W. Bursch, flight engineer, perform maintenance on equipment in the Zvezda Service Module on the International Space Station (ISS). Onufrienko represents Rosaviakosmos. The image was taken with a digital still camera.

  6. 47 CFR 87.307 - Cooperative use of facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SERVICES AVIATION SERVICES Flight Test Stations § 87.307 Cooperative use of facilities. (a) The Commission will license only one flight test land station per airport, except as provided in paragraph (d) of this section. (b) Flight test land stations located at an airport are required to provide service without...

  7. Flight service evaluation of composite components on the Bell helicopter model 206L, flight service report

    NASA Technical Reports Server (NTRS)

    Zinberg, H.

    1984-01-01

    The flight service components for the Bell Model 206L JetRanger helicopter are examined. The components were placed in service in the Continental United States, Canada, and Alaska. The status of 34 sets of components is discussed. Approximately 27,500 flight hours were accumulated on the components as of 1 August 1983. Three sets of components and one-fifth of the exposure coupons were returned and tested. The results are given. The overall behavior of the components and associated problems are discussed.

  8. The Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD) at NASA's Dryden Flight Research Center, Edwards, Calif.

    NASA Image and Video Library

    2007-06-25

    Lit by sunlight filtered through the smoke of a distant forest fire, the Space Shuttle Atlantis receives post-flight servicing in the Mate-Demate Device (MDD), following its landing at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft.

  9. In-Service Evaluation of the Dalmo Victor Active Beacon Collision Avoidance System (BCAS/TCAS).

    DTIC Science & Technology

    1982-10-01

    expected to make any substantial change to this report on operational performance. Collectively, this report and the additional technical per- fomance...deviation from the recorded flight path, while 10 others might have required some change in flight path, depending on the vertical rate of the TCAS...They are based on data collected with no response by the TCAS aircraft crew and will change when the crew initiates response action to resolution

  10. Flight Tests of Pilotage Error in Area Navigation with Vertical Guidance: Effects of Navigation Procedural Complexity

    DTIC Science & Technology

    1974-08-01

    contributed substantially to the planning of the flight course used in this study and in the preparation of this report. Assistance in business matters has...CONTENTS Page INTRODUCTION 1 METHOD 5 Subjects 5 Equipment Experimental Plan 8 Procedure 14 Performance Assessment 17 Statistical Treatment 19 RESULTS...implementation of RNAV service. These documents provide the basis for future RNAV planning both procedurally and quantitatively. At the heart of the

  11. Flight telerobotic servicer legacy

    NASA Astrophysics Data System (ADS)

    Shattuck, Paul L.; Lowrie, James W.

    1992-11-01

    The Flight Telerobotic Servicer (FTS) was developed to enhance and provide a safe alternative to human presence in space. The first step for this system was a precursor development test flight (DTF-1) on the Space Shuttle. DTF-1 was to be a pathfinder for manned flight safety of robotic systems. The broad objectives of this mission were three-fold: flight validation of telerobotic manipulator (design, control algorithms, man/machine interfaces, safety); demonstration of dexterous manipulator capabilities on specific building block tasks; and correlation of manipulator performance in space with ground predictions. The DTF-1 system is comprised of a payload bay element (7-DOF manipulator with controllers, end-of-arm gripper and camera, telerobot body with head cameras and electronics module, task panel, and MPESS truss) and an aft flight deck element (force-reflecting hand controller, crew restraint, command and display panel and monitors). The approach used to develop the DTF-1 hardware, software and operations involved flight qualification of components from commercial, military, space, and R controller, end-of-arm tooling, force/torque transducer) and the development of the telerobotic system for space applications. The system is capable of teleoperation and autonomous control (advances state of the art); reliable (two-fault tolerance); and safe (man-rated). Benefits from the development flight included space validation of critical telerobotic technologies and resolution of significant safety issues relating to telerobotic operations in the Shuttle bay or in the vicinity of other space assets. This paper discusses the lessons learned and technology evolution that stemmed from developing and integrating a dexterous robot into a manned system, the Space Shuttle. Particular emphasis is placed on the safety and reliability requirements for a man-rated system as these are the critical factors which drive the overall system architecture. Other topics focused on include: task requirements and operational concepts for servicing and maintenance of space platforms; origins of technology for dexterous robotic systems; issues associated with space qualification of components; and development of the industrial base to support space robotics.

  12. Bayes Analysis and Reliability Implications of Stress-Rupture Testing a Kevlar/Epoxy COPV Using Temperature and Pressure Acceleration

    NASA Technical Reports Server (NTRS)

    Phoenix, S. Leigh; Kezirian, Michael T.; Murthy, Pappu L. N.

    2009-01-01

    Composite Overwrapped Pressure Vessels (COPVs) that have survived a long service time under pressure generally must be recertified before service is extended. Flight certification is dependent on the reliability analysis to quantify the risk of stress rupture failure in existing flight vessels. Full certification of this reliability model would require a statistically significant number of lifetime tests to be performed and is impractical given the cost and limited flight hardware for certification testing purposes. One approach to confirm the reliability model is to perform a stress rupture test on a flight COPV. Currently, testing of such a Kevlar49 (Dupont)/epoxy COPV is nearing completion. The present paper focuses on a Bayesian statistical approach to analyze the possible failure time results of this test and to assess the implications in choosing between possible model parameter values that in the past have had significant uncertainty. The key uncertain parameters in this case are the actual fiber stress ratio at operating pressure, and the Weibull shape parameter for lifetime; the former has been uncertain due to ambiguities in interpreting the original and a duplicate burst test. The latter has been uncertain due to major differences between COPVs in the database and the actual COPVs in service. Any information obtained that clarifies and eliminates uncertainty in these parameters will have a major effect on the predicted reliability of the service COPVs going forward. The key result is that the longer the vessel survives, the more likely the more optimistic stress ratio model is correct. At the time of writing, the resulting effect on predicted future reliability is dramatic, increasing it by about one "nine," that is, reducing the predicted probability of failure by an order of magnitude. However, testing one vessel does not change the uncertainty on the Weibull shape parameter for lifetime since testing several vessels would be necessary.

  13. Engineering flight and guest pilot evaluation report, phase 2. [DC 8 aircraft

    NASA Technical Reports Server (NTRS)

    Morrison, J. A.; Anderson, E. B.; Brown, G. W.; Schwind, G. K.

    1974-01-01

    Prior to the flight evaluation, the two-segment profile capabilities of the DC-8-61 were evaluated and flight procedures were developed in a flight simulator at the UA Flight Training Center in Denver, Colorado. The flight evaluation reported was conducted to determine the validity of the simulation results, further develop the procedures and use of the area navigation system in the terminal area, certify the system for line operation, and obtain evaluations of the system and procedures by a number of pilots from the industry. The full area navigation capabilities of the special equipment installed were developed to provide terminal area guidance for two-segment approaches. The objectives of this evaluation were: (1) perform an engineering flight evaluation sufficient to certify the two-segment system for the six-month in-service evaluation; (2) evaluate the suitability of a modified RNAV system for flying two-segment approaches; and (3) provide evaluation of the two-segment approach by management and line pilots.

  14. Latex samples for RAMSES electrophoresis experiment on IML 2

    NASA Technical Reports Server (NTRS)

    Seaman, Geoffrey V. F.; Knox, Robert J.

    1994-01-01

    The objectives of these reported studies were to provide ground based support services for the flight experiment team for the RAMSES experiment to be flown aboard IML-2. The specific areas of support included consultation on the performance of particle based electrophoresis studies, development of methods for the preparation of suitable samples for the flight hardware, the screening of particles to obtain suitable candidates for the flight experiment, and the electrophoretic characterization of sample particle preparations. The first phases of these studies were performed under this contract, while the follow on work was performed under grant number NAG8 1081, 'Preparation and Characterization of Latex Samples for RAMSES Experiment on IML 2.' During this first phase of the experiment the following benchmarks were achieved: Methods were tested for the concentration and resuspension of latex samples in the greater than 0.4 micron diameter range to provide moderately high solids content samples free of particle aggregation which interferred with the normal functioning of the RAMSES hardware. Various candidate latex preparations were screened and two candidate types of latex were identified for use in the flight experiments, carboxylate modified latex (CML) and acrylic acid-acrylamide modified latex (AAM). These latexes have relatively hydrophilic surfaces, are not prone to aggregate, and display sufficiently low electrophoretic mobilities in the flight buffer so that they can be used to make mixtures to test the resolving power of the flight hardware.

  15. 14 CFR § 1214.205 - Revisit and/or retrieval services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... accomplished on a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... services will be priced on the basis of estimated costs. If a special dedicated Shuttle flight is required...

  16. 14 CFR 398.7 - Timing of flights.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Timing of flights. 398.7 Section 398.7... STATEMENTS GUIDELINES FOR INDIVIDUAL DETERMINATIONS OF BASIC ESSENTIAL AIR SERVICE § 398.7 Timing of flights. To qualify as essential air service, flights must depart at reasonable times, considering the needs...

  17. 14 CFR 398.7 - Timing of flights.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Timing of flights. 398.7 Section 398.7... STATEMENTS GUIDELINES FOR INDIVIDUAL DETERMINATIONS OF BASIC ESSENTIAL AIR SERVICE § 398.7 Timing of flights. To qualify as essential air service, flights must depart at reasonable times, considering the needs...

  18. Apollo 16 mission report. Supplement 2: Service Propulsion system final flight evaluation

    NASA Technical Reports Server (NTRS)

    Smith, R. J.; Wood, S. C.

    1974-01-01

    The Apollo 16 Mission was the sixteenth in a series of flights using Apollo flight hardware and included the fifth lunar landing of the Apollo Program. The Apollo 16 Mission utilized CSM 113 which was equipped with SPS Engine S/N 66 (Injector S/N 137). The engine configuration and expected performance characteristics are presented. Since previous flight results of the SPS have consistently shown the existence of a negative mixture ratio shift, SPS Engine S/N 66 was reorificed to increase the mixture ratio for this mission. The propellant unbalance for the two major engine firings is compared with the predicted unbalance. Although the unbalance at the end of the TEI burn is significantly different than the predicted unbalance, the propellant mixture ratio was well within limits. The SPS performed six burns during the mission, with a total burn duration of 575.3 seconds. The ignition time, burn duration and velocity gain for each of the six SPS burns are reported.

  19. Advanced aircraft service life monitoring method via flight-by-flight load spectra

    NASA Astrophysics Data System (ADS)

    Lee, Hongchul

    This research is an effort to understand current method and to propose an advanced method for Damage Tolerance Analysis (DTA) for the purpose of monitoring the aircraft service life. As one of tasks in the DTA, the current indirect Individual Aircraft Tracking (IAT) method for the F-16C/D Block 32 does not properly represent changes in flight usage severity affecting structural fatigue life. Therefore, an advanced aircraft service life monitoring method based on flight-by-flight load spectra is proposed and recommended for IAT program to track consumed fatigue life as an alternative to the current method which is based on the crack severity index (CSI) value. Damage Tolerance is one of aircraft design philosophies to ensure that aging aircrafts satisfy structural reliability in terms of fatigue failures throughout their service periods. IAT program, one of the most important tasks of DTA, is able to track potential structural crack growth at critical areas in the major airframe structural components of individual aircraft. The F-16C/D aircraft is equipped with a flight data recorder to monitor flight usage and provide the data to support structural load analysis. However, limited memory of flight data recorder allows user to monitor individual aircraft fatigue usage in terms of only the vertical inertia (NzW) data for calculating Crack Severity Index (CSI) value which defines the relative maneuver severity. Current IAT method for the F-16C/D Block 32 based on CSI value calculated from NzW is shown to be not accurate enough to monitor individual aircraft fatigue usage due to several problems. The proposed advanced aircraft service life monitoring method based on flight-by-flight load spectra is recommended as an improved method for the F-16C/D Block 32 aircraft. Flight-by-flight load spectra was generated from downloaded Crash Survival Flight Data Recorder (CSFDR) data by calculating loads for each time hack in selected flight data utilizing loads equations. From the comparison of interpolated fatigue life using CSI value and fatigue test results, it is obvious that proposed advanced IAT method via flight-by-flight load spectra is more reliable and accurate than current IAT method. Therefore, the advanced aircraft service life monitoring method based on flight-by-flight load spectra not only monitors the individual aircraft consumed fatigue life for inspection but also ensures the structural reliability of aging aircrafts throughout their service periods.

  20. Romanenko looks through a Rodnik Tank in the SM

    NASA Image and Video Library

    2012-12-31

    ISS034-E-010446 (31 Dec. 2012) --- Russian cosmonaut Roman Romanenko, Expedition 34 flight engineer, looks through a Rodnik tank in the Zvezda Service Module of the International Space Station. Romanenko performed a water transfer from a Rodnik tank in the Progress to a Rodnik tank in the Zvezda Service Module. Note the multiple refractions of the cosmonaut?s head and shoulders in the bubbles.

  1. CASIS Fact Sheet: Hardware and Facilities

    NASA Technical Reports Server (NTRS)

    Solomon, Michael R.; Romero, Vergel

    2016-01-01

    Vencore is a proven information solutions, engineering, and analytics company that helps our customers solve their most complex challenges. For more than 40 years, we have designed, developed and delivered mission-critical solutions as our customers' trusted partner. The Engineering Services Contract, or ESC, provides engineering and design services to the NASA organizations engaged in development of new technologies at the Kennedy Space Center. Vencore is the ESC prime contractor, with teammates that include Stinger Ghaffarian Technologies, Sierra Lobo, Nelson Engineering, EASi, and Craig Technologies. The Vencore team designs and develops systems and equipment to be used for the processing of space launch vehicles, spacecraft, and payloads. We perform flight systems engineering for spaceflight hardware and software; develop technologies that serve NASA's mission requirements and operations needs for the future. Our Flight Payload Support (FPS) team at Kennedy Space Center (KSC) provides engineering, development, and certification services as well as payload integration and management services to NASA and commercial customers. Our main objective is to assist principal investigators (PIs) integrate their science experiments into payload hardware for research aboard the International Space Station (ISS), commercial spacecraft, suborbital vehicles, parabolic flight aircrafts, and ground-based studies. Vencore's FPS team is AS9100 certified and a recognized implementation partner for the Center for Advancement of Science in Space (CASIS

  2. Respiratory symptoms of flight attendants during high-altitude flight: possible relation to cabin ozone exposure.

    PubMed

    Tashkin, D P; Coulson, A H; Simmons, M S; Spivey, G H

    1983-01-01

    The smaller size and lighter weight of the Boeing 747SP aircraft, introduced into passenger service in 1976, permitted higher-altitude flight than older commercial aircraft and thus potentially greater ozone exposure for those of board. Concerned flight attendants distributed questionnaires relating to symptoms experienced on the Boeing 747SP and/or conventional 747 aircraft to Los Angeles- and New York-based flight attendants. Respondents reported symptoms by frequency and severity and by in-flight and after-flight occurrence. Based on the assessment of three health scientists as to ozone-relatedness, the frequency of "definite" and "probable" ozone-related symptoms of any severity reported by both groups of attendants was significantly associated with 747SP flights (chi-squares: P less than 0.05). After-flight symptoms significantly associated with 747SP experience, although fewer in number than in-flight symptoms, were all in the scientists' "definite" category. In 21 flight attendants who complained of moderate to severe symptoms during 747SP flights, a battery of pulmonary function tests performed approximately two weeks after their last 747SP flight failed to reveal abnormalities. The symptom questionnaire results are consistent with possible exposure of cabin attendants to toxic levels of ozone during the higher-altitude flights of the Boeing 747SP compared to conventional 747 aircraft.

  3. Development and application of the double V type flame stabilizer

    NASA Astrophysics Data System (ADS)

    Zhang, Hongbin; Wang, Jigen

    1994-06-01

    The double V type flame stabilizer is an advanced stabilizer of low drag constructed with a big V type stabilizer overlapping to a small V type one. It has the advantages of good ignition performance, low drag loss, improved afterburning efficiency, low skin temperature, and leaner blowout boundary, hence the overall performance of turbojet engine will be improved and the flight reliability increased. More than 40 tests on stand rig, 10 tests in aircraft and 8 tests in flight were carried out for its birth, and thereafter, it started to be in service for the turbojet engine on a small batch scale in 1986-1987.

  4. Composite components on commercial aircraft

    NASA Technical Reports Server (NTRS)

    Dexter, H. B.

    1980-01-01

    Commercial aircraft manufacturers are making production commitments to composite structure for future aircraft and modifications to current production aircraft. Flight service programs with advanced composites sponsored by NASA during the past 10 years are described. Approximately 2.5 million total composite component flight hours have been accumulated since 1970 on both commercial transports and helicopters. Design concepts with significant mass savings were developed, appropriate inspection and maintenance procedures were established, and satisfactory service was achieved for the various composite components. A major NASA/U.S. industry technology program to reduce fuel consumption of commercial transport aircraft through the use of advanced composites was undertaken. Ground and flight environmental effects on the composite materials used in the flight service programs supplement the flight service evaluation.

  5. ATV ops

    NASA Image and Video Library

    2013-06-18

    ISS036-E-009256 (18 June 2013) --- NASA astronauts Chris Cassidy and Karen Nyberg, both Expedition 36 flight engineers, perform cargo operations in the European Space Agency's Automated Transfer Vehicle-4 (ATV-4) "Albert Einstein" currently docked to the Zvezda Service Module of the International Space Station.

  6. NASA Marshall Space Flight Center Improves Cooling System Performance: Best Management Practice Case Study #10: Cooling Towers (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) has a longstanding sustainability program that revolves around energy and water efficiency as well as environmental protection. MSFC identified a problematic cooling loop with six separate compressor heat exchangers and a history of poor efficiency. The facility engineering team at MSFC partnered with Flozone Services, Incorporated to implement a comprehensive water treatment platform to improve the overall efficiency of the system.

  7. MBS grappled to the Canadarm2 SSRMS during STS-111 UF-2 installation OPS on the ISS truss structure

    NASA Image and Video Library

    2002-06-10

    STS111-E-5139 (10 June 2002) --- Backdropped by the blackness of space and Earth’s horizon, the Mobile Remote Servicer Base System (MBS) is moved by the Canadarm2 for installation on the International Space Station (ISS). Astronauts Peggy A. Whitson, Expedition Five flight engineer, and Carl E. Walz, Expedition Four flight engineer, attached the MBS to the Mobile Transporter on the S0 (S-zero) Truss at 8:03 a.m. (CDT) on June 10, 2002. The MBS is an important part of the station’s Mobile Servicing System, which will allow the station’s robotic arm to travel the length of the station to perform construction tasks.

  8. MBS grappled to the Canadarm2 SSRMS during STS-111 UF-2 installation OPS on the ISS truss structure

    NASA Image and Video Library

    2002-06-10

    STS111-E-5142 (10 June 2002) --- Backdropped by the blackness of space and Earth’s horizon, the Mobile Remote Servicer Base System (MBS) is moved by the Canadarm2 for installation on the International Space Station (ISS). Astronauts Peggy A. Whitson, Expedition Five flight engineer, and Carl E. Walz, Expedition Four flight engineer, attached the MBS to the Mobile Transporter on the S0 (S-zero) Truss at 8:03 a.m. (CDT) on June 10, 2002. The MBS is an important part of the station’s Mobile Servicing System, which will allow the station’s robotic arm to travel the length of the station to perform construction tasks.

  9. KSC-08pd1949

    NASA Image and Video Library

    2008-07-11

    CAPE CANAVERAL, Fla. – The thermal vacuum fixture arrives at the Payload Hazardous Servicing Center at NASA's Kennedy Space Center. The fixture will be used to hold the carrier and flight support system for the STS-125 Hubble Space Telescope Servicing Mission 4. Space shuttle Atlantis is targeted to launch on the STS-125 mission Oct. 8. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller

  10. Ames Engineering Directorate

    NASA Technical Reports Server (NTRS)

    Phillips, Veronica J.

    2017-01-01

    The Ames Engineering Directorate is the principal engineering organization supporting aerospace systems and spaceflight projects at NASA's Ames Research Center in California's Silicon Valley. The Directorate supports all phases of engineering and project management for flight and mission projects-from R&D to Close-out-by leveraging the capabilities of multiple divisions and facilities.The Mission Design Center (MDC) has full end-to-end mission design capability with sophisticated analysis and simulation tools in a collaborative concurrent design environment. Services include concept maturity level (CML) maturation, spacecraft design and trades, scientific instruments selection, feasibility assessments, and proposal support and partnerships. The Engineering Systems Division provides robust project management support as well as systems engineering, mechanical and electrical analysis and design, technical authority and project integration support to a variety of programs and projects across NASA centers. The Applied Manufacturing Division turns abstract ideas into tangible hardware for aeronautics, spaceflight and science applications, specializing in fabrication methods and management of complex fabrication projects. The Engineering Evaluation Lab (EEL) provides full satellite or payload environmental testing services including vibration, temperature, humidity, immersion, pressure/altitude, vacuum, high G centrifuge, shock impact testing and the Flight Processing Center (FPC), which includes cleanrooms, bonded stores and flight preparation resources. The Multi-Mission Operations Center (MMOC) is composed of the facilities, networks, IT equipment, software and support services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing and science analysis.

  11. The 737 graphite composite flight spoiler flight service evaluation

    NASA Technical Reports Server (NTRS)

    Coggeshall, R. L.

    1982-01-01

    A flight service report was prepared which covers the flight service experience of 111 graphite epoxy spoilers on 737 transport aircraft and related ground based environmental exposure of graphite epoxy material specimens. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Tests of removed spoilers after the seventh year of service continue to indicate modest changes in composite strength properties. Two spoilers were tested, one with 6 and one with 7 years of service, and both had residual strengths that fall within the original static strength scatter band. Both these units had typical service included discrepancies when tested. Based on visual, ultrasonic, and destructive inspection there continues to be no evidence of moisture migration into the honeycomb core and no core corrosion in the deployed units.

  12. Challenger Anniversary Resource Tape

    NASA Technical Reports Server (NTRS)

    1996-01-01

    This commemorative video marks the tenth anniversary, January 28, 1986, of the ninth Challenger flight and the seven astronauts onboard who died when the Challenger exploded 73 seconds into flight. The flight crew was comprised of Cmdr. Francis R. Scobee, Pilot Michael J. Smith, and Mission Specialists Judith A. Resnik, Ellison S. Onizuka, Ronald E. McNair, Gregory Jarvis (Hughes Aircraft representative), and S. Christie McAuliffe (teacher). The flight crew is shown performing preflight training, physiological tests, environmental tests, press conferences, prelaunch activities, and launch activities. The Challenger explosion is shown from both the launch site and from the control center. Various rescue operations, news coverage, and shots of the wreckage after salvage are also presented. President Ronald Reagan is shown giving a tribute at the memorial service for the flight crew. The video ends with a flyby salute and pictures of each of the members of the Challenger.

  13. Methods for analysis of passenger trip performance in a complex networked transportation system

    NASA Astrophysics Data System (ADS)

    Wang, Danyi

    2007-12-01

    The purpose of the Air Transportation System (ATS) is to provide safe and efficient transportation service of passengers and cargo. The on-time performance of a passenger's trip is a critical performance measurement of the Quality of Service (QOS) provided by any Air Transportation System. QOS has been correlated with airline profitability, productivity, customer loyalty and customer satisfaction (Heskett et al. 1994). Btatu and Barnhart have shown that official government and airline on-time performance metrics (i.e. flight-centric measures of air transportation) fail to accurately reflect the passenger experience (Btatu and Barnhart, 2005). Flight-based metrics do not include the trip delays accrued by passengers who were re-booked due to cancelled flights or missed connections. Also, flight-based metrics do not quantify the magnitude of the delay (only the likelihood) and thus fails to provide the consumer with a useful assessment of the impact of a delay. Passenger-centric metrics have not been developed because of the unavailability of airline proprietary data, which is also protected by anti-trust collusion concerns and civil liberty privacy restrictions. Moveover, the growth of the ATS is trending out of the historical range. The objectives of this research were to (1) estimate ATS-wide passenger trip delay using publicly accessible flight data, and (2) investigate passenger trip dynamics out of the range of historical data by building a passenger flow simulation model to predict impact on passenger trip time given anticipated changes in the future. The first objective enables researchers to conduct historical analysis on passenger on-time performance without proprietary itinerary data, and the second objective enables researchers to conduct experiments outside the range of historic data. The estimated passenger trip delay was for 1,030 routes between the 35 busiest airports in the United States in 2006. The major findings of this research are listed as follows: 1. High passenger trip delays are disproportionately generated by cancelled flights and missed connections. Passengers scheduled on cancelled flights or missed connections represent 3 percent of total enplanements, but generated 45 percent of total passenger trip delay. On average, passengers scheduled on cancelled flights experienced 607 minutes delay, and passengers who missed the connections experienced 341 minutes delay in 2006. The heavily skewed distribution of passenger trip delay reveals the fact that a small proportion of passengers experience heavy delays, which can not be reflected by flight-based performance metrics. 2. Trend analysis for passenger trip delays from 2000 to 2006 shows the increase in flight operations slowed down and leveled off in 2006, while enplanements kept increasing. This is due to the continuous increase in load factor. Load factor has increased from 69% in 2003 to 80% in 2006. Passenger performance is very sensitive to changes in flight operations: annual total passenger trip delay was increased by 17% and 7% from 2004 to 2005, and from 2005 to 2006, while flight operations barely increased (0.5% from 2004 to 2005, and no increase from 2005 to 2006) during the same time period. 3. Passenger trip delay is shown to have an asymmetric performance of passenger trip delay in terms of routes. Seventeen percent of the 1030 routes generated 50 percent of total passenger trip delays. An interesting observation is that routes between the New York metropolitan area and the Washington D.C. metropolitan area have the highest average passenger trip delays in the system. 4. In terms of airports, there is also an asymmetric performance of passenger trip delay. Nine of the 35 busiest airports generated 50 percent of total passenger trip delays. Some airports, especially major hubs, impact the passenger trip delays significantly more than others. Recognition of this asymmetric performance can help reduce the total passenger trip delay propagation in the air transportation network by making changes primarily in major airports, such as Atlanta, GA (ATL), Chicago O'Hare (ORD) and Newark (EWR) airports. 5. Congestion Flight Delay, Load Factor, Flight Cancellation Time, and Airline Cooperation Policy are the most significant factors affecting total passenger trip delay in the system.

  14. Requirements for Flight Testing Automated Terminal Service

    DOT National Transportation Integrated Search

    1977-05-01

    This report describes requirements for the flight tests of the baseline Automated Terminals Service (ATS) system. The overall objective of the flight test program is to evaluate the feasibility of the ATS concept. Within this objective there are two ...

  15. Photogrammetric Assessment of the Hubble Space Telescope Solar Arrays During the Second Servicing Mission

    NASA Technical Reports Server (NTRS)

    Sapp, C. A.; Dragg, J. L.; Snyder, M. W.; Gaunce, M. T.; Decker, J. E.

    1998-01-01

    This report documents the photogrammetric assessment of the Hubble Space Telescope (HST) solar arrays conducted by the NASA c Center Image Science and Analysis Group during Second Servicing Mission 2 (SM-2) on STS-82 in February 1997. Two type solar array analyses were conducted during the mission using Space Shuttle payload bay video: (1) measurement of solar array motion due to induced loads, and (2) measurement of the solar array static or geometric twist caused by the cumulative array loading. The report describes pre-mission planning and analysis technique development activities conducted to acquire and analyze solar array imagery data during SM-2. This includes analysis of array motion obtained during SM-1 as a proof-of-concept of the SM-2 measurement techniques. The report documents the results of real-time analysis conducted during the mission and subsequent analysis conducted post-flight. This report also provides a summary of lessons learned on solar array imagery analysis from SM-2 and recommendations for future on-orbit measurements applicable to HST SM-3 and to the International Space Station. This work was performed under the direction of the Goddard Space Flight Center HST Flight Systems and Servicing Project.

  16. The NASA Dryden Flight Research Center Unmanned Aircraft System Service Capabilities

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2007-01-01

    Over 60 years of Unmanned Aircraft System (UAS) expertise at the National Aeronautics and Space Administration (NASA) Dryden Flight Research Center are being leveraged to provide capability and expertise to the international UAS community. The DFRC brings together technical experts, UAS, and an operational environment to provide government and industry a broad capability to conduct research, perform operations, and mature systems, sensors, and regulation. The cornerstone of this effort is the acquisition of both a Global Hawk (Northrop Grumman Corporation, Los Angeles, California) and Predator B (General Atomics Aeronautical Systems, Inc., San Diego, California) unmanned aircraft system (UAS). In addition, a test range for small UAS will allow developers to conduct research and development flights without the need to obtain approval from civil authorities. Finally, experts are available to government and industry to provide safety assessments in support of operations in civil airspace. These services will allow developers to utilize limited resources to their maximum capability in a highly competitive environment.

  17. EVA 3 activity on Flight Day 6 to service the Hubble Space Telescope

    NASA Image and Video Library

    1997-02-16

    S82-E-5572 (16 Feb. 1997) --- Pausing near the foot-restraint of the Remote Manipulator System (RMS), astronauts Steven L. Smith (left) and Mark C. Lee communicate with and look toward their in-cabin team members during the third Extravehicular Activity (EVA) to perform servicing chores on the Hubble Space Telescope (HST). This view was taken with an Electronic Still Camera (ESC).

  18. 47 CFR 87.299 - Scope of service.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Scope of service. 87.299 Section 87.299 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Flight Test Stations § 87.299 Scope of service. The use of flight test stations is restricted to the...

  19. CF6 jet engine performance deterioration results

    NASA Technical Reports Server (NTRS)

    Lewis, R. J.; Humerickhouse, C. E.; Paas, J. E.

    1978-01-01

    The use of the performance baseline from the flight planning manual as a reference to measure changes in cruise fuel flow rates was discussed. For the CF6-6D engine, the introduction of design changes for performance and durability reasons was seen to introduce an average increment relative to this baseline of 3.2% WFM increase at Nl, 2.5% Fn increase at Nl, 0.8% specific fuel consumption (SFC) increase at Fn, and 7 C EGT increase at Nl, while maintaining sufficient SFC margin of the delivered airplane. The effect of revenue service deterioration and performance restoration relative to the reference was shown to be an adder on top of these design effects. A schematic of typical CF6-6D performance through revenue service and airline maintenance is presented in terms of percent cruise SFC relative to an airline datum point (average level upon entering revenue service). The typical changes in SFC margin are shown for airline revenue service through for installations and refurbishments.

  20. 14 CFR 1214.119 - Spacelab payloads.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...

  1. 14 CFR 1214.119 - Spacelab payloads.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...

  2. 14 CFR 1214.119 - Spacelab payloads.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data....119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...

  3. 14 CFR 1214.119 - Spacelab payloads.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding...

  4. Advanced flight hardware for organic separations using aqueous two-phase partitioning

    NASA Astrophysics Data System (ADS)

    Deuser, Mark S.; Vellinger, John C.; Weber, John T.

    1996-03-01

    Separation of cells and cell components is the limiting factor in many biomedical research and pharmaceutical development processes. Aqueous Two-Phase Partitioning (ATPP) is a unique separation technique which allows purification and classification of biological materials. SHOT has employed the ATPP process in separation equipment developed for both space and ground applications. Initial equipment development and research focused on the ORganic SEParation (ORSEP) space flight experiments that were performed on suborbital rockets and the shuttle. ADvanced SEParations (ADSEP) technology was developed as the next generation of ORSEP equipment through a NASA Small Business Innovation Research (SBIR) contract. Under the SBIR contract, a marketing study was conducted, indicating a growing commercial market exists among biotechnology firms for ADSEP equipment and associated flight research and development services. SHOT is preparing to begin manufacturing and marketing laboratory versions of the ADSEP hardware for the ground-based market. In addition, through a self-financed SBIR Phase III effort, SHOT is fabricating and integrating the ADSEP flight hardware for a commercially-driven SPACEHAB 04 experiment that will be the initial step in marketing space separations services. The ADSEP ground-based and microgravity research is expected to play a vital role in developing important new biomedical and pharmaceutical products.

  5. Orbital Maneuvering Vehicle (OMV) remote servicing kit

    NASA Technical Reports Server (NTRS)

    Brown, Norman S.

    1988-01-01

    With the design and development of the Orbital Maneuvering Vehicle (OMV) progressing toward an early 1990 initial operating capability (IOC), a new era in remote space operations will evolve. The logical progression to OMV front end kits would make available in situ satellite servicing, repair, and consummables resupply to the satellite community. Several conceptual design study efforts are defining representative kits (propellant tanks, debris recovery, module servicers); additional focus must also be placed on an efficient combination module servicer and consummables resupply kit. A remote servicer kit of this type would be designed to perform many of the early maintenance/resupply tasks in both nominal and high inclination orbits. The kit would have the capability to exchange Orbital Replacement Units (ORUs), exchange propellant tanks, and/or connect fluid transfer umbilicals. Necessary transportation system functions/support could be provided by interfaces with the OMV, Shuttle (STS), or Expendable Launch Vehicle (ELV). Specific remote servicer kit designs, as well as ground and flight demonstrations of servicer technology are necessary to prepare for the potential overwhelming need. Ground test plans should adhere to the component/system/breadboard test philosophy to assure maximum capability of one-g testing. The flight demonstration(s) would most likely be a short duration, Shuttle-bay experiment to validate servicer components requiring a micro-g environment.

  6. 14 CFR 1214.115 - Standard services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...: commander, pilot and three mission specialists. (e) Orbiter flight planning services. (f) One day of... Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.115 Standard...

  7. 14 CFR § 1214.119 - Spacelab payloads.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; Level I only for customer-furnished Spacelab hardware). (6) Shuttle 1 and Spacelab flight planning. (7...) Extravehicular Activity (EVA) services. (13) Payload flight planning services. (14) Transmission of Spacelab data...§ 1214.119 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General...

  8. Noguchi uses BMMD in SM

    NASA Image and Video Library

    2010-05-26

    ISS023-E-052104 (26 May 2010) --- Japan Aerospace Exploration Agency (JAXA) astronaut Soichi Noguchi, Expedition 23 flight engineer, uses the IM mass measurement device to perform the PZEh-MO-8/Body Mass Measurement Russian biomedical routine assessments in the Zvezda Service Module of the International Space Station.

  9. Novitskiy prepares for the Typologia Experiment

    NASA Image and Video Library

    2013-02-12

    ISS034-E-042297 (12 Feb. 2013) --- Russian cosmonaut Oleg Novitskiy, Expedition 34 flight engineer, prepares for the Typologia experiment in the Zvezda Service Module of the International Space Station. This experiment studies the crew member's psychophysical state and ability to perform and communicate under stress.

  10. Novitskiy prepares for the Typologia Experiment

    NASA Image and Video Library

    2013-02-12

    ISS034-E-042298 (12 Feb. 2013) --- Russian cosmonaut Oleg Novitskiy, Expedition 34 flight engineer, prepares for the Typologia experiment in the Zvezda Service Module of the International Space Station. This experiment studies the crew member's psychophysical state and ability to perform and communicate under stress.

  11. Whitson and Treschev work on TVIS treadmill

    NASA Image and Video Library

    2002-08-07

    ISS005-E-08808 (7 August 2002) --- Cosmonaut Sergei Y. Treschev (left) and astronaut Peggy A. Whitson, both Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Treschev represents Rosaviakosmos.

  12. Whitson and Treschev work on TVIS treadmill

    NASA Image and Video Library

    2002-08-07

    ISS005-E-08819 (7 August 2002) --- Cosmonaut Sergei Y. Treschev (left) and astronaut Peggy A. Whitson, both Expedition Five flight engineers, perform maintenance on the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module on the International Space Station (ISS). Treschev represents Rosaviakosmos.

  13. The 737 graphite composite flight spoiler flight service evaluation

    NASA Technical Reports Server (NTRS)

    Stoecklin, R. L.

    1977-01-01

    The flight service experience of 110 graphite epoxy spoilers on 737 transport aircraft was reviewed as well as ground based environmental exposure of graphite epoxy material specimens for the period from April 1976 through April 1977. Several spoilers were installed on each of 27 aircraft representing seven major airlines operating throughout the world. A flight service evaluation program of at least 5 years is under way. As of April 30, 1977, a total of 766,938 spoiler flight hours and 1,168,090 spoiler landings were accumulated by the fleet. Based on visual ultrasonic, and destructive testing, there was no evidence of moisture migration into the honeycomb core and no core corrosion. Tests of removed spoilers and of ground based exposure specimens after the third year of service continue to indicate modest changes in composite strength properties.

  14. Manned Systems Utilization Analysis. Study 2.1: Space Servicing Pilot Program Study. [for automated payloads

    NASA Technical Reports Server (NTRS)

    Wolfe, R. R.

    1975-01-01

    Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.

  15. Extending a Flight Management Computer for Simulation and Flight Experiments

    NASA Technical Reports Server (NTRS)

    Madden, Michael M.; Sugden, Paul C.

    2005-01-01

    In modern transport aircraft, the flight management computer (FMC) has evolved from a flight planning aid to an important hub for pilot information and origin-to-destination optimization of flight performance. Current trends indicate increasing roles of the FMC in aviation safety, aviation security, increasing airport capacity, and improving environmental impact from aircraft. Related research conducted at the Langley Research Center (LaRC) often requires functional extension of a modern, full-featured FMC. Ideally, transport simulations would include an FMC simulation that could be tailored and extended for experiments. However, due to the complexity of a modern FMC, a large investment (millions of dollars over several years) and scarce domain knowledge are needed to create such a simulation for transport aircraft. As an intermediate alternative, the Flight Research Services Directorate (FRSD) at LaRC created a set of reusable software products to extend flight management functionality upstream of a Boeing-757 FMC, transparently simulating or sharing its operator interfaces. The paper details the design of these products and highlights their use on NASA projects.

  16. NASA Musculoskeletal Space Medicine and Reconditioning Program

    NASA Technical Reports Server (NTRS)

    Kerstman, Eric; Scheuring, Richard

    2011-01-01

    The Astronaut Strength, Conditioning, and Rehabilitation (ASCR) group is comprised of certified strength and conditioning coaches and licensed and certified athletic trainers. The ASCR group works within NASA s Space Medicine Division providing direction and supervision to the astronaut corp with regards to physical readiness throughout all phases of space flight. The ASCR group is overseen by flight surgeons with specialized training in sports medicine or physical medicine and rehabilitation. The goals of the ASCR group include 1) designing and administering strength and conditioning programs that maximize the potential for physical performance while minimizing the rate of injury, 2) providing appropriate injury management and rehabilitation services, 3) collaborating with medical, research, engineering, and mission operations groups to develop and implement safe and effective in-flight exercise countermeasures, and 4) providing a structured, individualized post-flight reconditioning program for long duration crew members. This Panel will present the current approach to the management of musculoskeletal injuries commonly seen within the astronaut corp and will present an overview of the pre-flight physical training, in-flight exercise countermeasures, and post-flight reconditioning program for ISS astronauts.

  17. Hubble Space Telescope - First Servicing Mission: Down to Earth Logistics - From GSFC to KSC and Back

    NASA Technical Reports Server (NTRS)

    Kubicko, Richard M.; Herrick, Robert

    1995-01-01

    The Hubble Space Telescope First Servicing Mission is a major accomplishment for NASA and has drawn world-wide attention and interest. The extravehicular servicing and repair activities performed by the STS-61 crew were the most ambitious ever undertaken. Their unprecedented success in performing on-orbit repair and maintenance, particularly in correcting the aberration in the primary mirror, has enabled the HST to provide sensational images and the anticipation of exciting scientific discoveries. Although the whole world watched the televised logistics activities (on-orbit maintenance) that took place in space, few are aware of the time and effort that went into planning and executing the space logistics that takes place with our feet on the ground. This paper addresses a major part of that effort - the packaging, handling, and transportation (PH&T) activities required to ship the GSFC HST space flight hardware and ground support equipment to KSC for launch and the post launch return to GSFC. It addresses the logistics and transportation planning for the containers for the Solar Array Carrier, the Orbital Replacement Unit Carrier, and the Flight Support System and their transporters, and the over land and water portions of the shipments.

  18. KSC-97pc354

    NASA Image and Video Library

    1997-02-21

    The STS-82 crew stands in front of the Space Shuttle Discovery after landing at KSC's Shuttle Landing Facility on Runway 15 to conclude a 10-day mission to service the orbiting Hubble Space Telescope (HST). Crew members are (from left to right) Mission Specialist Steven A. Hawley, Mission Commander Kenneth D. Bowersox, Mission Specialist Joseph R. "Joe" Tanner, Pilot Scott J. "Doc" Horowitz, Mission Specialist Gregory J. Harbaugh, Payload Commander Mark C. Lee and Mission Specialist Steven L. Smith. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  19. Flight Results from the HST SM4 Relative Navigation Sensor System

    NASA Technical Reports Server (NTRS)

    Naasz, Bo; Eepoel, John Van; Queen, Steve; Southward, C. Michael; Hannah, Joel

    2010-01-01

    On May 11, 2009, Space Shuttle Atlantis roared off of Launch Pad 39A enroute to the Hubble Space Telescope (HST) to undertake its final servicing of HST, Servicing Mission 4. Onboard Atlantis was a small payload called the Relative Navigation Sensor experiment, which included three cameras of varying focal ranges, avionics to record images and estimate, in real time, the relative position and attitude (aka "pose") of the telescope during rendezvous and deploy. The avionics package, known as SpaceCube and developed at the Goddard Space Flight Center, performed image processing using field programmable gate arrays to accelerate this process, and in addition executed two different pose algorithms in parallel, the Goddard Natural Feature Image Recognition and the ULTOR Passive Pose and Position Engine (P3E) algorithms

  20. Veggie Processing

    NASA Image and Video Library

    2017-02-15

    Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.

  1. Orion Entry Flight Control Stability and Performance

    NASA Technical Reports Server (NTRS)

    Strahan, Alan L.; Loe, Greg R.; Seiler, Pete

    2007-01-01

    The Orion Spacecraft will be required to perform entry and landing functions for both Low Earth Orbit (LEO) and Lunar return missions, utilizing only the Command Module (CM) with its unique systems and GN&C design. This paper presents the current CM Flight Control System (FCS) design to support entry and landing, with a focus on analyses that have supported its development to date. The CM FCS will have to provide for spacecraft stability and control while following guidance or manual commands during exo-atmospheric flight, after Service Module separation, translational powered flight required of the CM, atmospheric flight supporting both direct entry and skip trajectories down to drogue chute deploy, and during roll attitude reorientation just prior to touchdown. Various studies and analyses have been performed or are on-going supporting an overall FCS design with reasonably sized Reaction Control System (RCS) jets, that minimizes fuel usage, that provides appropriate command following but with reasonable stability and control margin. Results from these efforts to date are included, with particular attention on design issues that have emerged, such as the struggle to accommodate sub-sonic pitch and yaw control without using excessively large jets that could have a detrimental impact on vehicle weight. Apollo, with a similar shape, struggled with this issue as well. Outstanding CM FCS related design and analysis issues, planned for future effort, are also briefly be discussed.

  2. Space teleoperations technology for Space Station evolution

    NASA Technical Reports Server (NTRS)

    Reuter, Gerald J.

    1990-01-01

    Viewgraphs on space teleoperations technology for space station evolution are presented. Topics covered include: shuttle remote manipulator system; mobile servicing center functions; mobile servicing center technology; flight telerobotic servicer-telerobot; flight telerobotic servicer technology; technologies required for space station assembly; teleoperation applications; and technology needs for space station evolution.

  3. The Apollo spacecraft: A chronology, volume 3, 1 October 1964 - 20 January 1966

    NASA Technical Reports Server (NTRS)

    Brooks, C. G.; Ertel, I. D.

    1976-01-01

    The development of the Apollo spacecraft is traced along with that of Saturn V. Emphasis is placed on the detailed engineering design and exhaustive testing performed to qualify both the command and service modules and the lunar module for manned flight.

  4. View of FE Stott using the BMMD in the SM

    NASA Image and Video Library

    2009-10-12

    ISS021-E-014503 (12 Oct. 2009) --- NASA astronaut Nicole Stott, Expedition 21 flight engineer, uses the IM mass measurement device to perform the PZEh-MO-8/Body Mass Measurement Russian biomedical routine assessments in the Zvezda Service Module of the International Space Station.

  5. PZEh-MO-8/Body Mass Measurement

    NASA Image and Video Library

    2009-06-30

    ISS020-E-015853 (30 June 2009) --- Japan Aerospace Exploration Agency (JAXA) astronaut Koichi Wakata, Expedition 20 flight engineer, uses the IM mass measurement device to perform the PZEh-MO-8/Body Mass Measurement Russian biomedical routine assessments in the Zvezda Service Module of the International Space Station.

  6. Tarelkin prepares for the Typologia Experiment in the SM

    NASA Image and Video Library

    2013-01-24

    ISS034-E-033718 (24 Jan. 2013) --- Russian cosmonaut Evgeny Tarelkin, Expedition 34 flight engineer, prepares for the Typologia experiment in the Zvezda Service Module of the International Space Station. This experiment studies the crew member's psychophysical state and ability to perform and communicate under stress.

  7. Reiter performs TVIS maintenance

    NASA Image and Video Library

    2006-12-14

    ISS014-E-09897 (14 Dec. 2006) -- European Space Agency (ESA) astronaut Thomas Reiter, STS-116 mission specialist, works with the Treadmill Vibration Isolation System (TVIS) in the Zvezda Service Module of the International Space Station during in-flight maintenance (IFM) while Space Shuttle Discovery was docked with the station.

  8. KSC-08pd1950

    NASA Image and Video Library

    2008-07-11

    CAPE CANAVERAL, Fla. – The thermal vacuum fixture is transferred to a transporter in front of the Payload Hazardous Servicing Center at NASA's Kennedy Space Center. The fixture will be used to hold the carrier and flight support system for the STS-125 Hubble Space Telescope Servicing Mission 4. Space shuttle Atlantis is targeted to launch on the STS-125 mission Oct. 8. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller

  9. Orion Abort Flight Test

    NASA Technical Reports Server (NTRS)

    Hayes, Peggy Sue

    2010-01-01

    The purpose of NASA's Constellation project is to create the new generation of spacecraft for human flight to the International Space Station in low-earth orbit, the lunar surface, as well as for use in future deep-space exploration. One portion of the Constellation program was the development of the Orion crew exploration vehicle (CEV) to be used in spaceflight. The Orion spacecraft consists of a crew module, service module, space adapter and launch abort system. The crew module was designed to hold as many as six crew members. The Orion crew exploration vehicle is similar in design to the Apollo space capsules, although larger and more massive. The Flight Test Office is the responsible flight test organization for the launch abort system on the Orion crew exploration vehicle. The Flight Test Office originally proposed six tests that would demonstrate the use of the launch abort system. These flight tests were to be performed at the White Sands Missile Range in New Mexico and were similar in nature to the Apollo Little Joe II tests performed in the 1960s. The first flight test of the launch abort system was a pad abort (PA-1), that took place on 6 May 2010 at the White Sands Missile Range in New Mexico. Primary flight test objectives were to demonstrate the capability of the launch abort system to propel the crew module a safe distance away from a launch vehicle during a pad abort, to demonstrate the stability and control characteristics of the vehicle, and to determine the performance of the motors contained within the launch abort system. The focus of the PA-1 flight test was engineering development and data acquisition, not certification. In this presentation, a high level overview of the PA-1 vehicle is given, along with an overview of the Mobile Operations Facility and information on the White Sands tracking sites for radar & optics. Several lessons learned are presented, including detailed information on the lessons learned in the development of wind placards for flight. PA-1 flight data is shown, as well as a comparison of PA-1 flight data to nonlinear simulation Monte Carlo data.

  10. The space station freedom flight telerobotic servicer. The design and evolution of a dexterous space robot

    NASA Astrophysics Data System (ADS)

    McCain, Harry G.; Andary, James F.; Hewitt, Dennis R.; Haley, Dennis C.

    The Flight Telerobotic Servicer (FTS) Project at the Goddard Space Flight Center is developing an advanced telerobotic system to assist in and reduce crew extravehicular activity (EVA) for Space Station Freedom (SSF). The FTS will provide a telerobotic capability to the Freedom Station in the early assembly phases of the program and will be employed for assembly, maintenance, and inspection applications throughout the lifetime of the space station. Appropriately configured elements of the FTS will also be employed for robotic manipulation in remote satellite servicing applications and possibly the Lunar/Mars Program. In mid-1989, the FTS entered the flight system design and implementation phase (Phase C/D) of development with the signing of the FTS prime contract with Martin Marietta Astronautics Group in Denver, Colorado. The basic FTS design is now established and can be reported on in some detail. This paper will describe the FTS flight system design and the rationale for the specific design approaches and component selections. The current state of space technology and the general nature of the FTS task dictate that the FTS be designed with sophisticated teleoperation capabilities for its initial primary operating mode. However, there are technologies, such as advanced computer vision and autonomous planning techniques currently in research and advanced development phases which would greatly enhance the FTS capabilities to perform autonomously in less structured work environments. Therefore, a specific requirement on the initial FTS design is that it has the capability to evolve as new technology becomes available. This paper will describe the FTS design approach for evolution to more autonomous capabilities. Some specific task applications of the FTS and partial automation approaches of these tasks will also be discussed in this paper.

  11. The Space Station Freedom Flight Telerobotic Servicer: the design and evolution of a dexterous space robot.

    PubMed

    McCain, H G; Andary, J F; Hewitt, D R; Haley, D C

    1991-01-01

    The Flight Telerobotic Servicer (FTS) Project at the Goddard Space Flight Center is developing an advanced telerobotic system to assist in and reduce crew extravehicular activity (EVA) for Space Station) Freedom (SSF). The FTS will provide a telerobotic capability to the Freedom Station in the early assembly phases of the program and will be employed for assembly, maintenance, and inspection applications throughout the lifetime of the space station. Appropriately configured elements of the FTS will also be employed for robotic manipulation in remote satellite servicing applications and possibly the Lunar/Mars Program. In mid-1989, the FTS entered the flight system design and implementation phase (Phase C/D) of development with the signing of the FTS prime contract with Martin Marietta Astronautics Group in Denver, Colorado. The basic FTS design is now established and can be reported on in some detail. This paper will describe the FTS flight system design and the rationale for the specific design approaches and component selections. The current state of space technology and the nature of the FTS task dictate that the FTS be designed with sophisticated teleoperation capabilities for its initial primary operating mode. However, there are technologies, such as advanced computer vision and autonomous planning techniques currently in research and advanced development phases which would greatly enhance the FTS capabilities to perform autonomously in less structured work environments. Therefore, a specific requirement on the initial FTS design is that it has the capability to evolve as new technology becomes available. This paper will describe the FTS design approach for evolution to more autonomous capabilities. Some specific task applications of the FTS and partial automation approaches of these tasks will also be discussed in this paper.

  12. The Space Station Freedom Flight Telerobotic Servicer: the design and evolution of a dexterous space robot

    NASA Technical Reports Server (NTRS)

    McCain, H. G.; Andary, J. F.; Hewitt, D. R.; Haley, D. C.

    1991-01-01

    The Flight Telerobotic Servicer (FTS) Project at the Goddard Space Flight Center is developing an advanced telerobotic system to assist in and reduce crew extravehicular activity (EVA) for Space Station) Freedom (SSF). The FTS will provide a telerobotic capability to the Freedom Station in the early assembly phases of the program and will be employed for assembly, maintenance, and inspection applications throughout the lifetime of the space station. Appropriately configured elements of the FTS will also be employed for robotic manipulation in remote satellite servicing applications and possibly the Lunar/Mars Program. In mid-1989, the FTS entered the flight system design and implementation phase (Phase C/D) of development with the signing of the FTS prime contract with Martin Marietta Astronautics Group in Denver, Colorado. The basic FTS design is now established and can be reported on in some detail. This paper will describe the FTS flight system design and the rationale for the specific design approaches and component selections. The current state of space technology and the nature of the FTS task dictate that the FTS be designed with sophisticated teleoperation capabilities for its initial primary operating mode. However, there are technologies, such as advanced computer vision and autonomous planning techniques currently in research and advanced development phases which would greatly enhance the FTS capabilities to perform autonomously in less structured work environments. Therefore, a specific requirement on the initial FTS design is that it has the capability to evolve as new technology becomes available. This paper will describe the FTS design approach for evolution to more autonomous capabilities. Some specific task applications of the FTS and partial automation approaches of these tasks will also be discussed in this paper.

  13. STATUS AND FUTURE POSSIBILITIES OF DOMESTIC FLIGHTS BY FOREIGN AIRLINES

    NASA Astrophysics Data System (ADS)

    Hibino, Naohiko; Kobayashi, Yuki; Morichi, Shigeru

    As a regional strategy, it is very important for local cities that international flights are put into service to local airports and to increase tourists. It is problemati c for the airlines that their international flights are put into service directly between the local airport and the international airport since it is difficult for them to secure the number of passengers needed to operate the aircraft. Co ncerning 1-stop flights, there is a good possibility of securing number of passengers. Therefore, the study illustrated the possibilities of domestic airline flights by foreign airlines as international flights.

  14. Robotic technologies of the Flight Telerobotic Servicer (FTS) including fault tolerance

    NASA Technical Reports Server (NTRS)

    Chladek, John T.; Craver, William M.

    1994-01-01

    The original FTS concept for Space Station Freedom (SSF) was to provide telerobotic assistance to enhance crew activity and safety and to reduce crew EVA (Extra Vehicular Activity) activity. The first flight of the FTS manipulator systems would demonstrate several candidate tasks and would verify manipulator performance parameters. These first flight tasks included unlocking a SSF Truss Joint, mating/demating a fluid coupling, contact following of a contour board, demonstrating peg-in-hole assembly, and grasping and moving a mass. Future tasks foreseen for the FTS system included ORU (Orbit Replaceable Unit) change-out, Hubble Space Telescope Servicing, Gamma Ray Observatory refueling, and several in-situ SSF servicing and maintenance tasks. Operation of the FTS was planned to evolve from teleoperation to fully autonomous execution of many tasks. This wide range of mission tasks combined with the desire to evolve toward fully autonomy forced several requirements which may seen extremely demanding to the telerobotics community. The FTS requirements appear to have been created to accommodate the open-ended evolution plan such that operational evolution would not be impeded by function limitations. A recommendation arising from the FTS program to remedy the possible impacts from such ambitious requirements is to analyze candidate robotic tasks. Based on these task analyses, operational impacts against development impacts were weighed prior to requirements definition. Many of the FTS requirements discussed in the following sections greatly influenced the development cost and schedule of the FTS manipulator. The FTS manipulator has been assembled at Martin Marietta and is currently in testing. Successful component tests indicate a manipulator which achieves unprecedented performance specifications.

  15. ART CONCEPTS - APOLLO IX

    NASA Image and Video Library

    1969-02-20

    S69-19798 (February 1969) --- Composite of three artist's concepts illustrating key events, tasks and activities on the tenth day of the Apollo 9 mission, including Command Module and Service Modules separation, re-entry, and Atlantic splashdown. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  16. Cosmonauts and astronauts during medical operations training

    NASA Image and Video Library

    1994-06-11

    Using Dr. Dave E. Ward, a JSC physician, as a test subject, cosmonaut Gennadiy M. Strekalov (left), rehearses the taking of blood pressure. This is a service he will likely be performing a great deal next year when he boards Russia's Mir Space Station, in Earth-orbit, as Mir 18 flight engineer.

  17. Performance of color-dependent tasks of air traffic control specialists as a function of type and degree of color vision deficiency.

    DOT National Transportation Integrated Search

    1992-08-01

    This experiment was conducted to expand initial efforts to validate the requirement for normal color vision in Air Traffic Control Specialist (ATCS) personnel who work at en route center, terminal, and flight service station facilities. An enlarged d...

  18. CF6 Jet Engine Performance Improvement Program: High Pressure Turbine Aerodynamic Performance Improvement

    NASA Technical Reports Server (NTRS)

    Fasching, W. A.

    1980-01-01

    The improved single shank high pressure turbine design was evaluated in component tests consisting of performance, heat transfer and mechanical tests, and in core engine tests. The instrumented core engine test verified the thermal, mechanical, and aeromechanical characteristics of the improved turbine design. An endurance test subjected the improved single shank turbine to 1000 simulated flight cycles, the equivalent of approximately 3000 hours of typical airline service. Initial back-to-back engine tests demonstrated an improvement in cruise sfc of 1.3% and a reduction in exhaust gas temperature of 10 C. An additional improvement of 0.3% in cruise sfc and 6 C in EGT is projected for long service engines.

  19. Sierra Nevada Corporation (SNC) Dream Chaser arrival at Armstron

    NASA Image and Video Library

    2017-01-25

    Sierra Nevada Corporation’s Dream Chaser spacecraft arrives by truck at NASA’s Armstrong Flight Research Center in California, located on Edwards Air Force Base. The spacecraft will undergo several months of testing in preparation for its approach and landing flight on the base’s 22L runway. The test series is part of a developmental space act agreement SNC has with NASA’s Commercial Crew Program and will help SNC validate aerodynamic properties, flight software and control system performance. The Dream Chaser is also being prepared to deliver cargo to the International Space Station under NASA’s Commercial Resupply Services 2 contract beginning in 2019. The cargo Dream Chaser will fly at least six delivery missions to and from the space station by 2024.

  20. Sierra Nevada Corporation (SNC) Dream Chaser arrival at Armstrong

    NASA Image and Video Library

    2017-01-25

    Sierra Nevada Corporation’s Dream Chaser spacecraft arrives by truck at NASA’s Armstrong Flight Research Center in California, located on Edwards Air Force Base. The spacecraft will undergo several months of testing in preparation for its approach and landing flight on the base’s 22L runway. The test series is part of a developmental space act agreement SNC has with NASA’s Commercial Crew Program and will help SNC validate aerodynamic properties, flight software and control system performance. The Dream Chaser is also being prepared to deliver cargo to the International Space Station under NASA’s Commercial Resupply Services 2 contract beginning in 2019. The cargo Dream Chaser will fly at least six delivery missions to and from the space station by 2024.

  1. KSC-2013-3016

    NASA Image and Video Library

    2013-05-30

    Edwards, Calif. – ED13-161-35 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle out to a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  2. KSC-2013-3022

    NASA Image and Video Library

    2013-05-31

    Edwards, Calif. – ED13-164-34 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle out to a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  3. KSC-2013-3021

    NASA Image and Video Library

    2013-05-31

    Edwards, Calif. – ED13-164-34 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle out to a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  4. KSC-2013-3025

    NASA Image and Video Library

    2013-06-27

    Edwards, Calif. – ED13-0215-072 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle along a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  5. KSC-2013-3020

    NASA Image and Video Library

    2013-05-31

    Edwards, Calif. – ED13-164-33 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle out to a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  6. KSC-2013-3019

    NASA Image and Video Library

    2013-05-31

    Edwards, Calif. – ED13-164-32 - Sierra Nevada Corporation SNC Space Systems' team members tow the Dream Chaser flight vehicle out to a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  7. An epidemiological study of reproductive health in female civil aviation employees.

    PubMed

    Yang, Yue; Zhang, Weiyuan; Chan, Ada; Li, Chunling; He, Xiaoyan; Cui, Lei; Lv, Yuren; Liu, Juan; Guo, Xiuhua

    2013-06-01

    To investigate the correlations between occupational risk factors and reproductive health and to provide targeted healthcare services to female civil aviation employees based on surveys about menstrual and reproductive health status. Subjects were selected from flight attendants working for China Southern Airlines, Air China, and other airlines; employees of China Aviation Oil Limited, China TravelSky, and China Aviation Supplies Holding Company; and airport ground service crews. Data were collected using anonymous questionnaires. A total of 1175 valid questionnaires were recovered. The subjects were categorized into a flight attendant group and a ground service group, which contained 563 and 612 women, respectively. The prevalence of irregular menstruation, including abnormal cycles, severe dysmenorrhea, and hypomenorrhea or menorrhagia, was significantly higher in the flight attendant group (30.55%) than in the ground service group (13.40%); in concordance, the fertility rate was significantly lower in the flight attendant group (36.59%) than in the ground service group (43.95%). The spontaneous abortion rate in the flight attendant group (6.80%) was significantly higher than in the ground service group (2.97%). The rate of life-threatening abortions, preterm births, and low birth weight was significantly lower in the flight attendant group than in the ground service group. The impact of occupational risk factors on the reproductive health of female aviation workers should be evaluated and examined more thoroughly. Additional healthcare services such as routine menstruation healthcare and policies for workers planning to have a pregnancy are beneficial in monitoring reproductive health, reducing harmful exposures during early pregnancy, and preventing incapacitating gynecologic events.

  8. OA-7 Veggie Series 1 Processing

    NASA Image and Video Library

    2017-02-15

    Charles Spern, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.

  9. A Low Cost GPS System for Real-Time Tracking of Sounding Rockets

    NASA Technical Reports Server (NTRS)

    Markgraf, M.; Montenbruck, O.; Hassenpflug, F.; Turner, P.; Bull, B.; Bauer, Frank (Technical Monitor)

    2001-01-01

    This paper describes the development as well as the on-ground and the in-flight evaluation of a low cost Global Positioning System (GPS) system for real-time tracking of sounding rockets. The flight unit comprises a modified ORION GPS receiver and a newly designed switchable antenna system composed of a helical antenna in the rocket tip and a dual-blade antenna combination attached to the body of the service module. Aside from the flight hardware a PC based terminal program has been developed to monitor the GPS data and graphically displays the rocket's path during the flight. In addition an Instantaneous Impact Point (IIP) prediction is performed based on the received position and velocity information. In preparation for ESA's Maxus-4 mission, a sounding rocket test flight was carried out at Esrange, Kiruna, on 19 Feb. 2001 to validate existing ground facilities and range safety installations. Due to the absence of a dedicated scientific payload, the flight offered the opportunity to test multiple GPS receivers and assess their performance for the tracking of sounding rockets. In addition to the ORION receiver, an Ashtech G12 HDMA receiver and a BAE (Canadian Marconi) Allstar receiver, both connected to a wrap-around antenna, have been flown on the same rocket as part of an independent experiment provided by the Goddard Space Flight Center. This allows an in-depth verification and trade-off of different receiver and antenna concepts.

  10. Analysis and Preliminary Design of an Advanced Technology Transport Flight Control System

    NASA Technical Reports Server (NTRS)

    Frazzini, R.; Vaughn, D.

    1975-01-01

    The analysis and preliminary design of an advanced technology transport aircraft flight control system using avionics and flight control concepts appropriate to the 1980-1985 time period are discussed. Specifically, the techniques and requirements of the flight control system were established, a number of candidate configurations were defined, and an evaluation of these configurations was performed to establish a recommended approach. Candidate configurations based on redundant integration of various sensor types, computational methods, servo actuator arrangements and data-transfer techniques were defined to the functional module and piece-part level. Life-cycle costs, for the flight control configurations, as determined in an operational environment model for 200 aircraft over a 15-year service life, were the basis of the optimum configuration selection tradeoff. The recommended system concept is a quad digital computer configuration utilizing a small microprocessor for input/output control, a hexad skewed set of conventional sensors for body rate and body acceleration, and triple integrated actuators.

  11. 77 FR 47911 - Notice of a Change in Direction Finder Availability in Alaska

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... no flight assists, nor usage of DF equipment for orientation services. Newer technologies such as... approaches in Alaska. DF usage for pilot orientation has become almost non-existent. Since 2004, the Alaska Flight Service Information Area Group (AFSIAG) has documented eight flight assists that involved lost or...

  12. Caching strategies for improving performance of web-based Geographic applications

    NASA Astrophysics Data System (ADS)

    Liu, M.; Brodzik, M.; Collins, J. A.; Lewis, S.; Oldenburg, J.

    2012-12-01

    The NASA Operation IceBridge mission collects airborne remote sensing measurements to bridge the gap between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) mission and the upcoming ICESat-2 mission. The IceBridge Data Portal from the National Snow and Ice Data Center provides an intuitive web interface for accessing IceBridge mission observations and measurements. Scientists and users usually do not have knowledge about the individual campaigns but are interested in data collected in a specific place. We have developed a high-performance map interface to allow users to quickly zoom to an area of interest and see any Operation IceBridge overflights. The map interface consists of two layers: the user can pan and zoom on the base map layer; the flight line layer that overlays the base layer provides all the campaign missions that intersect with the current map view. The user can click on the flight campaigns and download the data as needed. The OpenGIS® Web Map Service Interface Standard (WMS) provides a simple HTTP interface for requesting geo-registered map images from one or more distributed geospatial databases. Web Feature Service (WFS) provides an interface allowing requests for geographical features across the web using platform-independent calls. OpenLayers provides vector support (points, polylines and polygons) to build a WMS/WFS client for displaying both layers on the screen. Map Server, an open source development environment for building spatially enabled internet applications, is serving the WMS and WFS spatial data to OpenLayers. Early releases of the portal displayed unacceptably poor load time performance for flight lines and the base map tiles. This issue was caused by long response times from the map server in generating all map tiles and flight line vectors. We resolved the issue by implementing various caching strategies on top of the WMS and WFS services, including the use of Squid (www.squid-cache.org) to cache frequently-used content. Our presentation includes the architectural design of the application, and how we use OpenLayers, WMS and WFS with Squid to build a responsive web application capable of efficiently displaying geospatial data to allow the user to quickly interact with the displayed information. We describe the design, implementation and performance improvement of our caching strategies, and the tools and techniques developed to assist our data caching strategies.

  13. Skylab rescue space vehicle flight readiness test

    NASA Technical Reports Server (NTRS)

    Jevitt, S. J.

    1973-01-01

    A Skylab Rescue Space Vehicle flight readiness test is described which ensures that space vehicle systems are in a state of flight readiness and are compatible with associated ground support equipment. The functions of propellant loading, umbilical ejection, ignition, holddown arm release, liftoff, and service arm and tail service mast retraction are simulated. The test outline is presented along with a list of references, intercommunications information, operations interface control chart, and flight test.

  14. Flight test of a low-altitude helicopter guidance system with obstacle avoidance capability

    NASA Technical Reports Server (NTRS)

    Zelenka, Richard E.; Clark, Raymond F.; Branigan, Robert G.

    1995-01-01

    Military aircraft regularly conduct missions that include low-atltitude, near-terrain flight in order to increase covertness and payload effectiveness. Civilian applications include airborne fire fighting, police surveillance, search and rescue, and helicopter emergency medical service. Several fixed-wing aircraft now employ terrain elevation maps and forward-pointed radars to achieve automated terrain following or terrain avoidance flight. Similar systems specialized to helicopters and their flight regime have not received as much attention. A helicopter guidance system relying on digitized terrain elevation maps has been developed that employs airborne navigation, mission requirements, aircraft performance limits, and radar altimeter returns to generate a valley-seeking, low-altitude trajectory between waypoints. The guidance trajectory is symbolically presented to the pilot on a helmet mounted display. This system has been flight tested to 150 ft (45.7 m) above ground level altitude at 80 kts, and is primarily limited by the ability of the pilot to perform manual detection and avoidance of unmapped hazards. In this study, a wide field of view laser radar sensor has been incorporated into this guidance system to assist the pilot in obstacle detection and avoidance, while expanding the system's operational flight envelope. The results from early flight tests of this system are presented. Low-altitude missions to 100 ft (30.5 m) altitude at 80n kts in the presence of unmapped natural and man-made obstacles were demonstrated while the pilot maintained situational awareness and tracking of the guidance trajectory. Further reductions in altitude are expected with continued flight testing.

  15. Flight Dynamics Performances of the MetOp A Satellite during the First Months of Operations

    NASA Technical Reports Server (NTRS)

    Righetti, Pier Luigi; Meixner, Hilda; Sancho, Francisco; Damiano, Antimo; Lazaro, David

    2007-01-01

    The 19th of October 2006 at 16:28 UTC the first MetOp satellite (MetOp A) was successfully launched from the Baykonur cosmodrome by a Soyuz/Fregat launcher. After only three days of LEOP operations, performed by ESOC, the satellite was handed over to EUMETSAT, who is since then taking care of all satellite operations. MetOp A is the first European operational satellite for meteorology flying in a Low Earth Orbit (LEO), all previous satellites operated by EUMETSAT, belonging to the METEOSAT family, being located in the Geo-stationary orbit. To ensure safe operations for a LEO satellite accurate and continuous commanding from ground of the on-board AOCS is required. That makes the operational transition at the end of the LEOP quite challenging, as the continuity of the Flight Dynamics operations is to be maintained. That means that the main functions of the Flight Dynamics have to be fully validated on-flight during the LEOP, before taking over the operational responsibility on the spacecraft, and continuously monitored during the entire mission. Due to the nature of a meteorological operational mission, very stringent requirements in terms of overall service availability (99 % of the collected data), timeliness of processing of the observation data (3 hours after sensing) and accuracy of the geo-location of the meteorological products (1 km) are to be fulfilled. That translates in tight requirements imposed to the Flight Dynamics facility (FDF) in terms of accuracy, timeliness and availability of the generated orbit and clock solutions; a detailed monitoring of the quality of these products is thus mandatory. Besides, being the accuracy of the image geo-location strongly related with the pointing performance of the platform and with the on-board timing stability, monitoring from ground of the behaviour of the on-board sensors and clock is needed. This paper presents an overview of the Flight Dynamics operations performed during the different phases of the MetOp A mission up to routine. The activities performed to validate all the Flight Dynamics functions, characterize the behaviour of the satellite and monitor the performances of the Flight Dynamics facility will be highlighted. The MetOp Flight Dynamics Operations team is led by Anders Meier Soerensen and composed by Pier Luigi Righetti, Francisco Sancho, Antimo Damiano and David Lazaro. The team is supported by Hilda Meixner, responsible for all Flight Dynamics validation activities.

  16. A field evaluation of data link flight information services for general aviation pilots

    DOT National Transportation Integrated Search

    1997-02-01

    This report documents a field study of Data Link Flight Information Services : (FIS) designed for use by general aviation (GA) pilots. The Data Link FIS : package that was evaluated in this study included the Traffic Information : Service (TIS), Text...

  17. The 737 graphite composite flight spoiler flight service evaluation

    NASA Technical Reports Server (NTRS)

    Stoecklin, R. L.

    1975-01-01

    The flight service experience of 108 graphite-epoxy spoilers on 737 transport aircraft, and related ground-based environmental exposure of graphite-epoxy material specimens were evaluated. Four spoilers were installed on each of 27 aircraft for a 5-year study. As of February 28, 1975, a total of 294,280 spoiler flight-hours and 460,686 spoiler landings were accumulated. Based on visual, ultrasonic, and destructive testing, no moisture migration into the honeycomb core and no core corrosion has occurred. Tests of removed spoilers and of ground-based exposure specimens after the first year of service indicate no significant changes in composite strength.

  18. Ares I-X Flight Test Vehicle: Stack 5 Modal Test

    NASA Technical Reports Server (NTRS)

    Buehrle, Ralph D.; Templeton, Justin D.; Reaves, Mercedes C.; Horta, Lucas G.; Gaspar, James L.; Bartolotta, Paul A.; Parks, Russel A.; Lazor, Danel R.

    2010-01-01

    Ares I-X was the first flight test vehicle used in the development of NASA's Ares I crew launch vehicle. The Ares I-X used a 4-segment reusable solid rocket booster from the Space Shuttle heritage with mass simulators for the 5th segment, upper stage, crew module and launch abort system. Three modal tests were defined to verify the dynamic finite element model of the Ares I-X flight test vehicle. Test configurations included two partial stacks and the full Ares I-X flight test vehicle on the Mobile Launcher Platform. This report focuses on the first modal test that was performed on the top section of the vehicle referred to as Stack 5, which consisted of the spacecraft adapter, service module, crew module and launch abort system simulators. This report describes the test requirements, constraints, pre-test analysis, test operations and data analysis for the Ares I-X Stack 5 modal test.

  19. KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility make final adjustments to the Flight Support System (FSS) for STS-82, the second Hubble Space Telescope servicing mission. The FSS is reusable flight hardware that provides the mechanical, structural and electrical interfaces between HST, the space support equipment and the orbiter for payload retrieval and on-orbit servicing. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.

    NASA Image and Video Library

    1997-01-16

    KENNEDY SPACE CENTER, FLA. - Workers in KSC's Vertical Processing Facility make final adjustments to the Flight Support System (FSS) for STS-82, the second Hubble Space Telescope servicing mission. The FSS is reusable flight hardware that provides the mechanical, structural and electrical interfaces between HST, the space support equipment and the orbiter for payload retrieval and on-orbit servicing. Liftoff aboard Discovery is targeted Feb. 11 with a crew of seven.

  20. STS-106 Crew Activities Report/Flight Day 07 Highlights

    NASA Technical Reports Server (NTRS)

    2000-01-01

    On this seventh day of the STS-106 Atlantis mission, the flight crew, Commander Commander Terrence W. Wilcutt, Pilot Scott D. Altman, and Mission Specialists Daniel C. Burbank, Edward T. Lu, Richard A. Mastracchio, Yuri Ivanovich Malenchenko, and Boris V. Morukov are seen participating in several outfitting activities. Burbank and Morukov remove and replace a fourth battery in Zarya. Lu and Malenchenko finish installing the third and final battery and other electrical equipment inside the Zvezda Service Module. While Altman and Wilcutt perform a series of jet firings, Altman is shown as he narrates a tour of the Zvezda Service Module. Scenes also include Lu and Malenchenko unpacking the Russian-made Orlan space suits, Burbank and Wilcutt participating in an interview, and a beautiful night shot of the International Space Station (ISS) and Atlantis complex above the Earth.

  1. An evaluation of the Goddard Space Flight Center Library

    NASA Technical Reports Server (NTRS)

    Herner, S.; Lancaster, F. W.; Wright, N.; Ockerman, L.; Shearer, B.; Greenspan, S.; Mccartney, J.; Vellucci, M.

    1979-01-01

    The character and degree of coincidence between the current and future missions, programs, and projects of the Goddard Space Flight Center and the current and future collection, services, and facilities of its library were determined from structured interviews and discussions with various classes of facility personnel. In addition to the tabulation and interpretation of the data from the structured interview survey, five types of statistical analyses were performed to corroborate (or contradict) the survey results and to produce useful information not readily attainable through survey material. Conclusions reached regarding compatability between needs and holdings, services and buildings, library hours of operation, methods of early detection and anticipation of changing holdings requirements, and the impact of near future programs are presented along with a list of statistics needing collection, organization, and interpretation on a continuing or longitudinal basis.

  2. Flight behaviour of honey bee (Apis mellifera) workers is altered by initial infections of the fungal parasite Nosema apis

    PubMed Central

    Dosselli, Ryan; Grassl, Julia; Carson, Andrew; Simmons, Leigh W.; Baer, Boris

    2016-01-01

    Honey bees (Apis mellifera) host a wide range of parasites, some being known contributors towards dramatic colony losses as reported over recent years. To counter parasitic threats, honey bees possess effective immune systems. Because immune responses are predicted to cause substantial physiological costs for infected individuals, they are expected to trade off with other life history traits that ultimately affect the performance and fitness of the entire colony. Here, we tested whether the initial onset of an infection negatively impacts the flight behaviour of honey bee workers, which is an energetically demanding behaviour and a key component of foraging activities. To do this, we infected workers with the widespread fungal pathogen Nosema apis, which is recognised and killed by the honey bee immune system. We compared their survival and flight behaviour with non-infected individuals from the same cohort and colony using radio frequency identification tags (RFID). We found that over a time frame of four days post infection, Nosema did not increase mortality but workers quickly altered their flight behaviour and performed more flights of shorter duration. We conclude that parasitic infections influence foraging activities, which could reduce foraging ranges of colonies and impact their ability to provide pollination services. PMID:27827404

  3. Flight behaviour of honey bee (Apis mellifera) workers is altered by initial infections of the fungal parasite Nosema apis.

    PubMed

    Dosselli, Ryan; Grassl, Julia; Carson, Andrew; Simmons, Leigh W; Baer, Boris

    2016-11-09

    Honey bees (Apis mellifera) host a wide range of parasites, some being known contributors towards dramatic colony losses as reported over recent years. To counter parasitic threats, honey bees possess effective immune systems. Because immune responses are predicted to cause substantial physiological costs for infected individuals, they are expected to trade off with other life history traits that ultimately affect the performance and fitness of the entire colony. Here, we tested whether the initial onset of an infection negatively impacts the flight behaviour of honey bee workers, which is an energetically demanding behaviour and a key component of foraging activities. To do this, we infected workers with the widespread fungal pathogen Nosema apis, which is recognised and killed by the honey bee immune system. We compared their survival and flight behaviour with non-infected individuals from the same cohort and colony using radio frequency identification tags (RFID). We found that over a time frame of four days post infection, Nosema did not increase mortality but workers quickly altered their flight behaviour and performed more flights of shorter duration. We conclude that parasitic infections influence foraging activities, which could reduce foraging ranges of colonies and impact their ability to provide pollination services.

  4. International Space Station Medical Project

    NASA Technical Reports Server (NTRS)

    Starkey, Blythe A.

    2008-01-01

    The goals and objectives of the ISS Medical Project (ISSMP) are to: 1) Maximize the utilization the ISS and other spaceflight platforms to assess the effects of longduration spaceflight on human systems; 2) Devise and verify strategies to ensure optimal crew performance; 3) Enable development and validation of a suite of integrated physical (e.g., exercise), pharmacologic and/or nutritional countermeasures against deleterious effects of space flight that may impact mission success or crew health. The ISSMP provides planning, integration, and implementation services for Human Research Program research tasks and evaluation activities requiring access to space or related flight resources on the ISS, Shuttle, Soyuz, Progress, or other spaceflight vehicles and platforms. This includes pre- and postflight activities; 2) ISSMP services include operations and sustaining engineering for HRP flight hardware; experiment integration and operation, including individual research tasks and on-orbit validation of next generation on-orbit equipment; medical operations; procedures development and validation; and crew training tools and processes, as well as operation and sustaining engineering for the Telescience Support Center; and 3) The ISSMP integrates the HRP approved flight activity complement and interfaces with external implementing organizations, such as the ISS Payloads Office and International Partners, to accomplish the HRP's objectives. This effort is led by JSC with Baseline Data Collection support from KSC.

  5. International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Perry, Jay L.; Callahan, David M.

    2000-01-01

    As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

  6. The 737 graphite composite flight spoiler flight service evaluation

    NASA Technical Reports Server (NTRS)

    Stoecklin, R. L.

    1976-01-01

    The flight-service experience of 110 graphite-epoxy spoilers on 737 transport aircraft and related ground-based environmental exposure of graphite-epoxy material specimens is reported. Spoilers were installed on each of 27 aircraft representing seven major airlines operating throughout the world. Based on visual, ultrasonic, and destructive testing, there is no evidence of moisture migration into the honeycomb core and no core corrosion. Tests of removed spoilers and of ground-based exposure specimens after the second year of service indicate modest changes in composite strength.

  7. 29 CFR 825.801 - Special rules for airline flight crew employees, hours of service requirement.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... DIVISION, DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Special Rules Applicable... personal commute time or time spent on vacation, medical, or sick leave. (c) An airline flight crew... service requirement. (a) An airline flight crew employee's eligibility for FMLA leave is to be determined...

  8. 29 CFR 825.801 - Special rules for airline flight crew employees, hours of service requirement.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... DIVISION, DEPARTMENT OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Special Rules Applicable... personal commute time or time spent on vacation, medical, or sick leave. (c) An airline flight crew... service requirement. (a) An airline flight crew employee's eligibility for FMLA leave is to be determined...

  9. Aircraft surface coatings study: Verification of selected materials

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Three liquid coatings and four films that might improve and/or maintain the smoothness of transport aircraft surfaces are considered. Laboratory tests were performed on the liquid coatings (elastomeric polyurethanes) exposed to synthetic type hydraulic fluid, with and without a protective topcoat. Results were analyzed of a 14-month flight service evaluation of coatings applied to leading edges of an airline 727. Two additional airline service evaluations were initiated. Labortory tests were conducted on the films, bonded to aluminum substrate with various adhesives, to determine the best film/adhesive combinations. A cost/benefits analysis was performed and recommendations made for future work toward the application of this technology to commercial transports.

  10. 14 CFR 1214.105 - Apportionment and/or assignment of services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...

  11. 14 CFR 1214.105 - Apportionment and/or assignment of services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...

  12. 14 CFR 1214.105 - Apportionment and/or assignment of services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...

  13. 76 FR 52231 - Restrictions on Operators Employing Former Flight Standards Service Aviation Safety Inspectors

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Standards Service Aviation Safety Inspectors AGENCY: Federal Aviation Administration (FAA), DOT. ACTION... responsible for the oversight of, a Flight Standards Service Aviation Safety Inspector, and had direct... . SUPPLEMENTARY INFORMATION: Authority for This Rulemaking The FAA's authority to issue rules on aviation safety...

  14. STS-106 Mission Specialist Burbank suits up before launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    During suitup in the Operations and Checkout Building, STS-106 Mission Specialist Daniel C. Burbank smiles in anticipation of launch. This is Burbank'''s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed '''Expedition One,''' is due to arrive at the Station in late fall.

  15. STS-106 Mission Specialist Morukov suits up before launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-106 Mission Specialist Boris V. Morukov gives a thumbs up for launch during suitup in the Operations and Checkout Building before launch. This is Morukov'''s first space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed '''Expedition One,''' is due to arrive at the Station in late fall.

  16. STS-106 Mission Specialist Lu suits up before launch

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-106 Mission Specialist Edward T. Lu smiles as he gets suited up in the Operations and Checkout Building before launch. This is Lu'''s second space flight. Space Shuttle Atlantis is set to lift off 8:45 a.m. EDT on the fourth flight to the International Space Station. During the 11-day mission, the seven-member crew will perform support tasks on orbit, transfer supplies and prepare the living quarters in the newly arrived Zvezda Service Module. The first long-duration crew, dubbed '''Expedition One,''' is due to arrive at the Station in late fall.

  17. Aircraft surface coatings

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Liquid, spray on elastomeric polyurethanes are selected and investigated as best candidates for aircraft external protective coatings. Flight tests are conducted to measure drag effects of these coatings compared to paints and a bare metal surface. The durability of two elastometric polyurethanes are assessed in airline flight service evaluations. Laboratory tests are performed to determine corrosion protection properties, compatibility with aircraft thermal anti-icing systems, the effect of coating thickness on erosion durability, and the erosion characteristics of composite leading edges-bare and coated. A cost and benefits assessment is made to determine the economic value of various coating configurations to the airlines.

  18. STS-109 Post Flight Presentation

    NASA Astrophysics Data System (ADS)

    2002-04-01

    The STS-109 Post Flight presentation begins with Mission Specialists Nancy J. Currie, Michael J. Massimino, James H. Newman, and Richard M. Linnehan shown getting suited on launch day. Actual footage of the liftoff of the Space Shuttle Columbia is shown. Five spacewalks are performed to service the Hubble Space Telescope. Richard Linnehan and John Grunsfield are replacing solar arrays, connectors and power control units on the Hubble Space Telescope. Mission Specialist Nancy Currie will use Space Shuttle Columbia's robotic arm to grab the telescope, move it away from the orbiter and release it. A look at the coast of South America is also presented.

  19. STS-82 Crew members pose in from of Discovery after Landing

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The STS-82 crew stands in front of the Space Shuttle Discovery after landing at KSC's Shuttle Landing Facility on Runway 15 to conclude a 10-day mission to service the orbiting Hubble Space Telescope (HST). Crew members are (from left to right) Mission Specialist Steven A. Hawley, Mission Commander Kenneth D. Bowersox, Mission Specialist Joseph R. 'Joe' Tanner, Pilot Scott J. 'Doc' Horowitz, Mission Specialist Gregory J. Harbaugh, Payload Commander Mark C. Lee and Mission Specialist Steven L. Smith. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997.

  20. KSC-97pc351

    NASA Image and Video Library

    1997-02-21

    KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  1. KSC-97pc355

    NASA Image and Video Library

    1997-02-21

    Accompanied by former astronaut Michael J. McCulley, several members of the STS-82 crew look at thermal protection system tile under the Space Shuttle Discovery on the runway at the Shuttle Landing Facility shortly after the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). From left to right, they are Mission Specialist Steven A. Hawley; Michael J. McCulley, currently vice president and associate program manager for ground operations for the United Space Alliance at KSC; Mission Specialists Joseph R. "Joe" Tanner and Steven L. Smith (back to camera); and Payload Commander Mark C. Lee. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  2. KSC-97pc353

    NASA Image and Video Library

    1997-02-21

    KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  3. KSC-97pc350

    NASA Image and Video Library

    1997-02-21

    KENNEDY SPACE CENTER, Fla. -- Under the cover of darkness, the Space Shuttle orbiter Discovery glides in for a landing on Runway 15 at KSC's Shuttle Landing Facility at the conclusion of a 10-day mission to service the orbiting Hubble Space Telescope (HST). New runway centerline lights provide an additional visual aid for the nighttime landings. STS-82 is the ninth Shuttle nighttime landing, and the fourth nighttime landing at KSC. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  4. Operational experience and design recommendations for teleoperated flight hardware

    NASA Technical Reports Server (NTRS)

    Burgess, T. W.; Kuban, D. P.; Hankins, W. W.; Mixon, R. W.

    1988-01-01

    Teleoperation (remote manipulation) will someday supplement/minimize astronaut extravehicular activity in space to perform such tasks as satellite servicing and repair, and space station construction and servicing. This technology is being investigated by NASA with teleoperation of two space-related tasks having been demonstrated at the Oak Ridge National Lab. The teleoperator experiments are discussed and the results of these experiments are summarized. The related equipment design recommendations are also presented. In addition, a general discussion of equipment design for teleoperation is also presented.

  5. Veggie Processing

    NASA Image and Video Library

    2017-02-15

    Charles Spern, at right, project manager on the Engineering Services Contract (ESC), and Glenn Washington, ESC quality assurance specialist, perform final inspections of the Veggie Series 1 plant experiment inside a laboratory in the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. At far left is Dena Richmond, ESC configuration management. The Series 1 experiment is being readied for flight aboard Orbital ATK's Cygnus module on its seventh (OA-7) Commercial Resupply Services mission to the International Space Station. The Veggie system is on the space station.

  6. KENNEDY SPACE CENTER, FLA. - The rising sun and some scattered clouds provide a picturesque backdrop for the Space Shuttle Discovery as it travels along the crawlerway toward Launch Pad 39A in preparation for the STS-82 mission. The Shuttle is on a Mobile Launcher Platform, and the entire assemblage is being carried by a large, tracked vehicle called the crawler transporter. A seven-member crew will perform the second servicing of the orbiting Hubble Space Telescope (HST) during the 10-day STS-82 flight, whcih is targeted for a Feb. 11 liftoff.

    NASA Image and Video Library

    1997-01-17

    KENNEDY SPACE CENTER, FLA. - The rising sun and some scattered clouds provide a picturesque backdrop for the Space Shuttle Discovery as it travels along the crawlerway toward Launch Pad 39A in preparation for the STS-82 mission. The Shuttle is on a Mobile Launcher Platform, and the entire assemblage is being carried by a large, tracked vehicle called the crawler transporter. A seven-member crew will perform the second servicing of the orbiting Hubble Space Telescope (HST) during the 10-day STS-82 flight, whcih is targeted for a Feb. 11 liftoff.

  7. The 737 graphite composite flight spoiler flight service evaluation

    NASA Technical Reports Server (NTRS)

    Hoffman, D. J.; Stoecklin, R. L.

    1980-01-01

    The flight service experience of 111 graphite-epoxy spoilers on 737 transport aircraft and related ground based enviromental exposure of graphite-epoxy material specimens is reported. Spoilers were installed on 28 aircraft representing seven major airlines operating throughout the world. Over 1,188,367 spoiler flight hours and 1,786,837 spoiler landings were accumulated by this fleet. Tests of removed spoilers and ground-based exposure specimens after the fifth year of service indicate modest changes in composite strength properties. Two incidents of trailing edge delamination with subsequent core corrosion were observed. Based on visual, ultrasonic, and destructive testing, there has been no evidence of moisture migration into the honeycomb core and no core corrosion.

  8. Sierra Nevada Corporation (SNC) Dream Chaser arrival at Armstron

    NASA Image and Video Library

    2017-01-25

    Sierra Nevada Corporation’s Dream Chaser spacecraft is removed from its delivery truck after arriving at NASA’s Armstrong Flight Research Center in California, located on Edwards Air Force Base. The spacecraft will undergo several months of testing in preparation for its approach and landing flight on the base’s 22L runway. The test series is part of a developmental space act agreement SNC has with NASA’s Commercial Crew Program and will help SNC validate aerodynamic properties, flight software and control system performance. The Dream Chaser is also being prepared to deliver cargo to the International Space Station under NASA’s Commercial Resupply Services 2 contract beginning in 2019. The cargo Dream Chaser will fly at least six delivery missions to and from the space station by 2024.

  9. KSC-2013-3024

    NASA Image and Video Library

    2013-06-27

    Edwards, Calif. – ED13-0215-024 - Sierra Nevada Corporation SNC Space Systems' team members prepare to tow the Dream Chaser flight vehicle along a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  10. KSC-2013-3023

    NASA Image and Video Library

    2013-06-27

    Edwards, Calif. – ED13-0215-016 - Sierra Nevada Corporation SNC Space Systems' team members prepare to tow the Dream Chaser flight vehicle along a concrete runway at NASA's Dryden Flight Research Center in California for range and taxi tow tests. The ground testing will validate the performance of the spacecraft's nose skid, brakes, tires and other systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is one of three companies working with NASA's Commercial Crew Program, or CCP, during the agency's Commercial Crew Integrated Capability, or CCiCap, initiative, which is intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  11. NASA Human Research Program Behavioral Health and Performance Element (BHP)

    NASA Technical Reports Server (NTRS)

    Whitmire, Sandra; Faulk, Jeremy; Leveton, Lauren

    2010-01-01

    The goal of NASA BHP is to identify, characterize, and prevent or reduce behavioral health and performance risks associated with space travel, exploration, and return to terrestrial life. The NASA Behavioral Health and Performance Operations Group (BHP Ops) supports astronauts and their families before, during, and after a long-duration mission (LDM) on the ISS. BHP Ops provides ISS crews with services such as preflight training (e.g., psychological factors of LDM, psychological support, cross-cultural); preflight, in-flight, and postflight support services, including counseling for astronauts and their families; and psychological support such as regular care packages and a voice-over IP phone system between crew members and their families to facilitate real-time one-on-one communication.

  12. Microgravity effects on standardized cognitive performance measures

    NASA Technical Reports Server (NTRS)

    Schiflett, Samuel G.

    1992-01-01

    The purpose of this experiment, selected to fly on the International Microgravity Laboratory (IML-2) Spacelab mission, is to determine the effects of microgravity upon the cognitive skills which are critical to successful performance of many tasks on board the Space Shuttle. Six tests from the Unified Tri-service Cognitive Performance Assessment Battery (UTC-PAB) will be administered to the Mission Specialists to fulfill the goals of this experiment. These tests are based upon current theoretical models of human performance and the hypothesized effects of microgravity. The principle objective is the identification of the effects of microgravity upon specific information processing skills affecting performance from those of fatigue and shifts in work/rest cycles. Multiple measures of both short and long term fatigue will be obtained and used as a major independent variable for the analysis of these performance data. Scientific supporting studies will determine optimum practice and performance testing schedules for the astronauts. The same tests will be used post-flight to collect data on the recovery of any cognitive performance impairment compared with pre-flight, baseline levels.

  13. Definition of technology development missions for early Space Station satellite servicing. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    1984-01-01

    The Executive Summary volume 1, includes an overview of both phases of the Definition of Technology Development Missions for Early Space Station Satellite Servicing. The primary purpose of Phase 1 of the Marshall Space Flight Center (MSFC) Satellite Servicing Phase 1 study was to establish requirements for demonstrating the capability of performing satellite servicing activities on a permanently manned Space Station in the early 1990s. The scope of Phase 1 included TDM definition, outlining of servicing objectives, derivation of initial Space Station servicing support requirements, and generation of the associated programmatic schedules and cost. The purpose of phase 2 of the satellite servicing study was to expand and refine the overall understanding of how best to use the manned space station as a test bed for demonstration of satellite servicing capabilities.

  14. 14 CFR 382.27 - May a carrier require a passenger with a disability to provide advance notice in order to obtain...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... service animal in the cabin; (9) Transportation of a service animal on a flight segment scheduled to take... disability to provide advance notice in order to obtain certain specific services in connection with a flight... Nondiscrimination and Access to Services and Information § 382.27 May a carrier require a passenger with a...

  15. 14 CFR 382.27 - May a carrier require a passenger with a disability to provide advance notice in order to obtain...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... service animal in the cabin; (9) Transportation of a service animal on a flight segment scheduled to take... disability to provide advance notice in order to obtain certain specific services in connection with a flight... Nondiscrimination and Access to Services and Information § 382.27 May a carrier require a passenger with a...

  16. Technicians inspect external tank attachment fittings on the Space Shuttle Discovery as part of its post-flight processing at NASA DFRC

    NASA Image and Video Library

    2005-08-12

    Robert 'Skip' Garrett; main propulsion advanced systems technician, and Chris Jacobs; main propulsion systems engineering technician, inspect external tank attachment fittings on the Space Shuttle Discovery as part of it's post-flight processing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle pa

  17. 14 CFR § 1214.105 - Apportionment and/or assignment of services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.105 Apportionment and/or assignment of services. (a) Subject to NASA approval, a customer may apportion and/or assign Shuttle services to third parties within the payload. No apportionment...

  18. Satellite Servicing in Mission Design Studies at the NASA GSFC

    NASA Technical Reports Server (NTRS)

    Leete, Stephen J.

    2003-01-01

    Several NASA missions in various stages of development have undergone one-week studies in the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) Integrated Mission Design Center (IMDC), mostly in preparation for proposals. The possible role of satellite servicing has been investigated for several of these missions, applying the lessons learned from Hubble Space Telescope (HST) servicing, taking into account the current state of the art, projecting into the future, and implementing NASA long-range plans, and is presented here. The general benefits and costs of injecting satellite servicing are detailed, including components such as mission timeline, mass, fuel, spacecraft design, risk abatement, life extension, and improved performance. The approach taken in addressing satellite servicing during IMDC studies is presented.

  19. A flight test of laminar flow control leading-edge systems

    NASA Technical Reports Server (NTRS)

    Fischer, M. C.; Wright, A. S., Jr.; Wagner, R. D.

    1983-01-01

    NASA's program for development of a laminar flow technology base for application to commercial transports has made significant progress since its inception in 1976. Current efforts are focused on development of practical reliable systems for the leading-edge region where the most difficult problems in applying laminar flow exist. Practical solutions to these problems will remove many concerns about the ultimate practicality of laminar flow. To address these issues, two contractors performed studies, conducted development tests, and designed and fabricated fully functional leading-edge test articles for installation on the NASA JetStar aircraft. Systems evaluation and performance testing will be conducted to thoroughly evaluate all system capabilities and characteristics. A simulated airline service flight test program will be performed to obtain the operational sensitivity, maintenance, and reliability data needed to establish that practical solutions exist for the difficult leading-edge area of a future commercial transport employing laminar flow control.

  20. A Rainbow View of NASA's RS-25 Engine Test

    NASA Image and Video Library

    2017-02-22

    NASA engineers conducted their first RS-25 test of 2017 on the A-1 Test Stand at Stennis Space Center near Bay St. Louis, Mississippi, on Feb. 22, continuing to collect data on the performance of the rocket engine that will help power the new Space Launch System (SLS) rocket. Shown from the viewpoint of an overhead drone, the test of development engine No. 0528 ran the scheduled 380 seconds (six minutes and 20 seconds), allowing engineers to monitor various engine operating conditions. The test represents another step forward in development of the rocket that will launch humans aboard Orion deeper into space than ever before. Four RS-25 engines, together with a pair of solid rocket boosters, will power the SLS at launch on its deep-space missions. The engines for the first four SLS flights are former space shuttle main engines, which were tested extensively at Stennis and are some of the most proven engines in the world. Engineers are conducting an ongoing series of tests this year for SLS on both development and flight engines for future flights to ensure the engine, outfitted with a new controller, can perform at the higher level under a variety of conditions and situations. Stennis is also preparing its B-2 Test Stand to test the core stage for the first SLS flight with Orion, known as Exploration Mission-1. That testing will involve installing the flight stage on the stand and firing its four RS-25 engines simultaneously, just as during an actual launch. The Feb. 22 test was conducted by Aerojet Rocketdyne and Syncom Space Services engineers and operators. Aerojet Rocketdyne is the prime contractor for the RS-25 engines. Syncom Space Services is the prime contractor for Stennis facilities and operations. PAO Name:Kim Henry Phone Number:256-544-1899 Email Address: kimberly.m.henry@nasa.gov

  1. Modifications to the rapid melt/rapid quench and transparent polymer video furnaces for the KC-135

    NASA Technical Reports Server (NTRS)

    Smith, Guy A.; Kosten, Sue E.; Workman, Gary L.

    1990-01-01

    Given here is a summary of tasks performed on two furnace systems, the Transparent Polymer (TPF) and the Rapid Melt/Rapid Quench (RMRQ) furnaces, to be used aboard NASA's KC-135. It was determined that major changes were needed for both furnaces to operate according to the scientific investigators' experiment parameters. Discussed here are what the problems were, what was required to solve the problems, and possible future enhancements. It was determined that the enhancements would be required for the furnaces to perform at their optimal levels. Services provided include hardware and software modifications, Safety DataPackage documentation, ground based testing, transportation to and from Ellington Air Field, operation of hardware during KC-135 flights, and post-flight data processing.

  2. The servicing aid tool: A teleoperated robotics system for space applications

    NASA Technical Reports Server (NTRS)

    Dorman, Keith W.; Pullen, John L.; Keksz, William O.; Eismann, Paul H.; Kowalski, Keith A.; Karlen, James P.

    1994-01-01

    The Servicing Aid Tool (SAT) is a teleoperated, force-reflecting manipulation system designed for use on the Space Shuttle. The system will assist Extravehicular Activity (EVA) servicing of spacecraft such as the Hubble Space Telescope. The SAT stands out from other robotics development programs in that special attention was given to provide a low-cost, space-qualified design which can easily and inexpensively be reconfigured and/or enhanced through the addition of existing NASA funded technology as that technology matures. SAT components are spaceflight adaptations of existing ground-based designs from Robotics Research Corporation (RRC), the leading supplier of robotics systems to the NASA and university research community in the United States. Fairchild Space is the prime contractor and provides the control electronics, safety system, system integration, and qualification testing. The manipulator consists of a 6-DOF Slave Arm mounted on a 1-DOF Positioning Link in the shuttle payload bay. The Slave Arm is controlled via a highly similar, 6-DOF, force-reflecting Master Arm from Schilling Development, Inc. This work is being performed under contract to the Goddard Space Flight Center Code, Code 442, Hubble Space Telescope Flight Systems and Servicing Project.

  3. Overview of GX launch services by GALEX

    NASA Astrophysics Data System (ADS)

    Sato, Koji; Kondou, Yoshirou

    2006-07-01

    Galaxy Express Corporation (GALEX) is a launch service company in Japan to develop a medium size rocket, GX rocket and to provide commercial launch services for medium/small low Earth orbit (LEO) and Sun synchronous orbit (SSO) payloads with a future potential for small geo-stationary transfer orbit (GTO). It is GALEX's view that small/medium LEO/SSO payloads compose of medium scaled but stable launch market due to the nature of the missions. GX rocket is a two-stage rocket of well flight proven liquid oxygen (LOX)/kerosene booster and LOX/liquid natural gas (LNG) upper stage. This LOX/LNG propulsion under development by Japan's Aerospace Exploration Agency (JAXA), is robust with comparable performance as other propulsions and have future potential for wider application such as exploration programs. GX rocket is being developed through a joint work between the industries and GX rocket is applying a business oriented approach in order to realize competitive launch services for which well flight proven hardware and necessary new technology are to be introduced as much as possible. It is GALEX's goal to offer “Easy Access to Space”, a highly reliable and user-friendly launch services with a competitive price. GX commercial launch will start in Japanese fiscal year (JFY) 2007 2008.

  4. NASA Glenn Research Center Support of the ASRG Project

    NASA Technical Reports Server (NTRS)

    Wilson, Scott D.; Wong, Wayne A.

    2014-01-01

    A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

  5. Computational Models of Human Performance: Validation of Memory and Procedural Representation in Advanced Air/Ground Simulation

    NASA Technical Reports Server (NTRS)

    Corker, Kevin M.; Labacqz, J. Victor (Technical Monitor)

    1997-01-01

    The Man-Machine Interaction Design and Analysis System (MIDAS) under joint U.S. Army and NASA cooperative is intended to assist designers of complex human/automation systems in successfully incorporating human performance capabilities and limitations into decision and action support systems. MIDAS is a computational representation of multiple human operators, selected perceptual, cognitive, and physical functions of those operators, and the physical/functional representation of the equipment with which they operate. MIDAS has been used as an integrated predictive framework for the investigation of human/machine systems, particularly in situations with high demands on the operators. We have extended the human performance models to include representation of both human operators and intelligent aiding systems in flight management, and air traffic service. The focus of this development is to predict human performance in response to aiding system developed to identify aircraft conflict and to assist in the shared authority for resolution. The demands of this application requires representation of many intelligent agents sharing world-models, coordinating action/intention, and cooperative scheduling of goals and action in an somewhat unpredictable world of operations. In recent applications to airborne systems development, MIDAS has demonstrated an ability to predict flight crew decision-making and procedural behavior when interacting with automated flight management systems and Air Traffic Control. In this paper, we describe two enhancements to MIDAS. The first involves the addition of working memory in the form of an articulatory buffer for verbal communication protocols and a visuo-spatial buffer for communications via digital datalink. The second enhancement is a representation of multiple operators working as a team. This enhanced model was used to predict the performance of human flight crews and their level of compliance with commercial aviation communication procedures. We show how the data produced by MIDAS compares with flight crew performance data from full mission simulations. Finally, we discuss the use of these features to study communication issues connected with aircraft-based separation assurance.

  6. 38 CFR 21.134 - Limitation on flight training.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2014-07-01 2014-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...

  7. 38 CFR 21.134 - Limitation on flight training.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2013-07-01 2013-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...

  8. 38 CFR 21.134 - Limitation on flight training.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2012-07-01 2012-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...

  9. 38 CFR 21.134 - Limitation on flight training.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...

  10. 38 CFR 21.134 - Limitation on flight training.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 2 2011-07-01 2011-07-01 false Limitation on flight.... Chapter 31 Educational and Vocational Training Services § 21.134 Limitation on flight training. Flight... that include required flight training. This type of training is otherwise subject to the same...

  11. 14 CFR 415.127 - Flight safety system design and operation data.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation...: flight termination system; command control system; tracking; telemetry; communications; flight safety... control system. (7) Flight termination system component storage, operating, and service life. A listing of...

  12. Influence of trap design on upwind flight behavior and capture of female grape berry moth (Lepidoptera: Tortricidea) with a kairomone lure

    USDA-ARS?s Scientific Manuscript database

    Oil-coated clear panel traps baited with a host plant-based kairomone lure are effective in monitoring female grape berry moth (GBM), Paralobesia viteana (Clemens) (Lepidoptera:Tortricidae), but servicing these traps in a vineyard is cumbersome. In this study, we compared the performance of differen...

  13. Selections from the ABC 2016 Annual Conference, Albuquerque, New Mexico: Teaching Innovations Soaring Like a Flight of Balloons over Albuquerque

    ERIC Educational Resources Information Center

    Whalen, D. Joel, Ed.

    2017-01-01

    This article, the second of a two-part series, presents 12 assignments designed to help students increase their online communication skills, conduct professional conferences, use advanced presentation software, develop problem-solving and critical thinking, gain greater awareness of gender effects in communication, and perform community service.…

  14. Tyurin in Zvezda Service module

    NASA Image and Video Library

    2007-03-01

    ISS014-E-15711 (1 March 2007) --- Cosmonaut Mikhail Tyurin, Expedition 14 flight engineer representing Russia's Federal Space Agency, disconnects a SKV1 heat exchanger unit during in-flight maintenance (IFM) in the Zvezda Service Module of the International Space Station.

  15. Barratt with TVIS in Service module

    NASA Image and Video Library

    2009-04-22

    ISS019-E-009491 (22 April 2009) --- Astronaut Michael Barratt, Expedition 19/20 flight engineer, poses for a photo with the Treadmill Vibration Isolation System (TVIS) during in-flight maintenance operations in the Zvezda Service Module of the International Space Station.

  16. [Aviation medicine laboratory of the North Fleet air base celebrates the 70th anniversary].

    PubMed

    Gavrilov, V V; Mazaĭkin, D N; Buldakov, I M; Pisarev, A A

    2013-05-01

    The article is dedicated to the history of formation and development of the oldest aviation medicine department and its role in a flight safety of the North Fleet naval aviation. The aviation medicine laboratory was created in the years of the Great Patriotic war for medical backup of flights, medical review board, delivering of combat casualty care, prophylaxis of hypothermia and exhaustion of flight and ground crew. In a post-war period the aviation medicine laboratory made a great contribution to development of medical backup of educational and combat activity of the North Fleet aviation. Participation in cosmonaut applicants selection (incl. Yu.A. Gagarin), optimization of flight services during the transmeridian flights, research of carrier-based aircraft habitability and body state of the contingent during the longstanding ship-based aviation, development of treatment methods for functional status of sea-based aviation crew are the achievements of aviation medicine laboratory. Nowadays medicine laboratory is performing a research and practice, methodic and consultative activity with the aim of improving the system of medical backup, aviation medicine, psychology, flight safety, improvement of air crew health, prolong of flying proficiency.

  17. A 10-Year Cross-Sectional Analysis of Air Force Flight and Operational Medicine Clinic Health Care Services.

    PubMed

    Tvaryanas, Anthony P; Maupin, Genny M; Fouts, Brittany L

    2016-05-01

    This study described the patient population and the health care services delivered in the Air Force Flight and Operational Medicine Clinics (FOMCs) over the past 10 years. A cross-sectional analysis was performed on the retrospective cohort of patients who received care at a FOMC from 2003 to 2012. A total of 714,157 individuals, generating 4,829,626 encounters, were included in the cohort. They were predominately male service members under the age of 41. One-fifth of individuals were retirees and family members, with one-third being in the pediatric age range. The cohort accessed health care services for three primary reasons: health examinations (28%), occupational dispositions (18%), and primary care (54%). When primary care was sought, the predominate health conditions were upper respiratory infections, back problems, and nontraumatic joint disorders. When services and procedures were a component of the care, they were predominately associated with health examinations involving ophthalmologic, auditory, and cardiac screening tests. Individuals accessing the FOMCs had relatively low need for access to health care services, requiring a median of two annual encounters. This study provided insight into the health care delivered in FOMCs and establishes a foundation for future planning and management of FOMC health care delivery. Reprint & Copyright © 2016 Association of Military Surgeons of the U.S.

  18. The space station assembly phase: System design trade-offs for the flight telerobotic servicer

    NASA Technical Reports Server (NTRS)

    Smith, Jeffrey H.; Gyamfi, Max; Volkmer, Kent; Zimmerman, Wayne

    1988-01-01

    The effects of a recent study aimed at identifying key issues and trade-offs associated with using a Flight Telerobotic Servicer (FTS) to aid in Space Station assembly-phase tasks is described. The use of automation and robotic (A and R) technologies for large space systems often involves a substitution of automation capabilities for human EVA or IVA activities. A methodology is presented that incorporates assessment of candidate assembly-phase tasks, telerobotic performance capabilities, development costs, and effects of operational constaints. Changes in the region of cost-effectiveness are examined under a variety of system design assumptions. A discussion of issues is presented with focus on three roles the FTS might serve: as a research-oriented test bed to learn more about space usage of telerobotics; as a research based test bed having an experimental demonstration orientation with limited assembly and servicing applications; or as an operational system to augment EVA and to aid construction of the Space Station and to reduce the program (schedule) risk by increasing the flexibility of mission operations.

  19. A Cooperative Human-Adaptive Traffic Simulation (CHATS)

    NASA Technical Reports Server (NTRS)

    Phillips, Charles T.; Ballin, Mark G.

    1999-01-01

    NASA is considering the development of a Cooperative Human-Adaptive Traffic Simulation (CHATS), to examine and evaluate performance of the National Airspace System (NAS) as the aviation community moves toward free flight. CHATS will be specifically oriented toward simulating strategic decision-making by airspace users and by the service provider s traffic management personnel, within the context of different airspace and rules assumptions. It will use human teams to represent these interests and make decisions, and will rely on computer modeling and simulation to calculate the impacts of these decisions. The simulation objectives will be to examine: 1. evolution of airspace users and the service provider s strategies, through adaptation to new operational environments; 2. air carriers competitive and cooperative behavior; 3. expected benefits to airspace users and the service provider as compared to the current NAS; 4. operational limitations of free flight concepts due to congestion and safety concerns. This paper describes an operational concept for CHATS, and presents a high-level functional design which would utilize a combination of existing and new models and simulation capabilities.

  20. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  1. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  2. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  3. 14 CFR 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro rata...

  4. 14 CFR § 1214.806 - Premature termination of Spacelab flights.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... If a dedicated-Shuttle Spacelab flight, a dedicated-pallet flight, or dedicated-FMDM/MPESS flight is prematurely terminated, NASA shall refund the optional services charges for planned, but unused, extra days on orbit. If a complete-pallet or shared-element flight is prematurely terminated, NASA shall refund a pro...

  5. An overview of the Office of Space Flight satellite servicing program plan

    NASA Technical Reports Server (NTRS)

    Levin, George M.; Erwin, Harry O., Jr.

    1987-01-01

    A comprehensive program for the development of satellite servicing tools and techniques is being currently carried out by the Office of Space Flight. The program is based on a satellite servicing infrastructure formulated by analyzing satellite servicing requirements; the program is Shuttle-based and compatible with the Orbital Maneuvering Vehicle and Space Station. The content of the satellite servicing program is reviewed with reference to the tools, techniques, and procedures being developed for refueling (or consumables resupply), repairing, and retrieving.

  6. International Space Station Medical Projects - Full Services to Mars

    NASA Technical Reports Server (NTRS)

    Pietrzyk, R. A.; Primeaux, L. L.; Wood, S. J.; Vessay, W. B.; Platts, S. H.

    2018-01-01

    The International Space Station Medical Projects (ISSMP) Element provides planning, integration, and implementation services for HRP research studies for both spaceflight and flight analog research. Through the implementation of these two efforts, ISSMP offers an innovative way of guiding research decisions to meet the unique challenges of understanding the human risks to space exploration. Flight services provided by ISSMP include leading informed consent briefings, developing and validating in-flight crew procedures, providing ISS crew and ground-controller training, real-time experiment monitoring, on-orbit experiment and hardware operations and facilitating data transfer to investigators. For analog studies at the NASA Human Exploration Research Analog (HERA), the ISSMP team provides subject recruitment and screening, science requirements integration, data collection schedules, data sharing agreements, mission scenarios and facilities to support investigators. The ISSMP also serves as the HRP interface to external analog providers including the :envihab bed rest facility (Cologne, Germany), NEK isolation chamber (Moscow, Russia) and the Antarctica research stations. Investigators working in either spaceflight or analog environments requires a coordinated effort between NASA and the investigators. The interdisciplinary nature of both flight and analog research requires investigators to be aware of concurrent research studies and take into account potential confounding factors that may impact their research objectives. Investigators must define clear research requirements, participate in Investigator Working Group meetings, obtain human use approvals, and provide study-specific training, sample and data collection and procedures all while adhering to schedule deadlines. These science requirements define the technical, functional and performance operations to meet the research objectives. The ISSMP maintains an expert team of professionals with the knowledge and experience to guide investigators science through all aspects of mission planning, crew operations, and research integration. During this session, the ISSMP team will discuss best-practices approaches for successfully preparing and conducting studies in both the flight and analog environments. Critical tips and tricks will be shown to greatly improve your chances of successfully completing your research aboard the International Space Station and in Spaceflight Analogs.

  7. Department of Defense Air Traffic Control and Airspace Systems Interface with the National Airspace System

    DTIC Science & Technology

    1990-03-30

    systems on the DoD in terms of safety and operational- effectiveness and probable impacts on specific Air Force mission requirements. The report does... Systems ................................. 2-21 2.1.3 Flight Service and Weather Systems .......................... 2-22 2.1.3.1 Flight Service Automation...2-41 2.2.2 Terminal Control and Landing Systems .. ....................... 2-44 2.2.3 Flight Information and Weather Systems

  8. Feasibility of a Networked Air Traffic Infrastructure Validation Environment for Advanced NextGen Concepts

    NASA Technical Reports Server (NTRS)

    McCormack, Michael J.; Gibson, Alec K.; Dennis, Noah E.; Underwood, Matthew C.; Miller,Lana B.; Ballin, Mark G.

    2013-01-01

    Abstract-Next Generation Air Transportation System (NextGen) applications reliant upon aircraft data links such as Automatic Dependent Surveillance-Broadcast (ADS-B) offer a sweeping modernization of the National Airspace System (NAS), but the aviation stakeholder community has not yet established a positive business case for equipage and message content standards remain in flux. It is necessary to transition promising Air Traffic Management (ATM) Concepts of Operations (ConOps) from simulation environments to full-scale flight tests in order to validate user benefits and solidify message standards. However, flight tests are prohibitively expensive and message standards for Commercial-off-the-Shelf (COTS) systems cannot support many advanced ConOps. It is therefore proposed to simulate future aircraft surveillance and communications equipage and employ an existing commercial data link to exchange data during dedicated flight tests. This capability, referred to as the Networked Air Traffic Infrastructure Validation Environment (NATIVE), would emulate aircraft data links such as ADS-B using in-flight Internet and easily-installed test equipment. By utilizing low-cost equipment that is easy to install and certify for testing, advanced ATM ConOps can be validated, message content standards can be solidified, and new standards can be established through full-scale flight trials without necessary or expensive equipage or extensive flight test preparation. This paper presents results of a feasibility study of the NATIVE concept. To determine requirements, six NATIVE design configurations were developed for two NASA ConOps that rely on ADS-B. The performance characteristics of three existing in-flight Internet services were investigated to determine whether performance is adequate to support the concept. Next, a study of requisite hardware and software was conducted to examine whether and how the NATIVE concept might be realized. Finally, to determine a business case, economic factors were evaluated and a preliminary cost-benefit analysis was performed.

  9. Accelerated development and flight evaluation of active controls concepts for subsonic transport aircraft. Volume 1: Load alleviation/extended span development and flight tests

    NASA Technical Reports Server (NTRS)

    Johnston, J. F.

    1979-01-01

    Active wing load alleviation to extend the wing span by 5.8 percent, giving a 3 percent reduction in cruise drag is covered. The active wing load alleviation used symmetric motions of the outboard ailerons for maneuver load control (MLC) and elastic mode suppression (EMS), and stabilizer motions for gust load alleviation (GLA). Slow maneuvers verified the MLC, and open and closed-loop flight frequency response tests verified the aircraft dynamic response to symmetric aileron and stabilizer drives as well as the active system performance. Flight tests in turbulence verified the effectiveness of the active controls in reducing gust-induced wing loads. It is concluded that active wing load alleviation/extended span is proven in the L-1011 and is ready for application to airline service; it is a very practical way to obtain the increased efficiency of a higher aspect ratio wing with minimum structural impact.

  10. 14 CFR 1214.115 - Standard services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...

  11. 14 CFR 1214.115 - Standard services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...

  12. 14 CFR 1214.115 - Standard services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...

  13. NASA Conjunction Assessment Organizational Approach and the Associated Determination of Screening Volume Sizes

    NASA Technical Reports Server (NTRS)

    Newman, Lauri K.; Hejduk, Matthew D.

    2015-01-01

    NASA is committed to safety of flight for all of its operational assets Performed by CARA at NASA GSFC for robotic satellites Focus of this briefing Performed by TOPO at NASA JSC for human spaceflight he Conjunction Assessment Risk Analysis (CARA) was stood up to offer this service to all NASA robotic satellites Currently provides service to 70 operational satellites NASA unmanned operational assets Other USG assets (USGS, USAF, NOAA) International partner assets Conjunction Assessment (CA) is the process of identifying close approaches between two orbiting objects; sometimes called conjunction screening The Joint Space Operations Center (JSpOC) a USAF unit at Vandenberg AFB, maintains the high accuracy catalog of space objects, screens CARA-supported assets against the catalog, performs OD tasking, and generates close approach data.

  14. A comparison of the Shuttle remote manipulator system and the Space Station Freedom mobile servicing center

    NASA Technical Reports Server (NTRS)

    Taylor, Edith C.; Ross, Michael

    1989-01-01

    The Shuttle Remote Manipulator System is a mature system which has successfully completed 18 flights. Its primary functional design driver was the capability to deploy and retrieve payloads from the Orbiter cargo bay. The Space Station Freedom Mobile Servicing Center is still in the requirements definition and early design stage. Its primary function design drivers are the capabilities: to support Space Station construction and assembly tasks; to provide external transportation about the Space Station; to provide handling capabilities for the Orbiter, free flyers, and payloads; to support attached payload servicing in the extravehicular environment; and to perform scheduled and un-scheduled maintenance on the Space Station. The differences between the two systems in the area of geometric configuration, mobility, sensor capabilities, control stations, control algorithms, handling performance, end effector dexterity, and fault tolerance are discussed.

  15. The Quality of Municipal Services, Central City Decline, and Middle-Class Flight. Research Report R78-1.

    ERIC Educational Resources Information Center

    Katzman, Martin T.

    The emphasis in this report is on how public service quality affects urban decline and middle-class flight. It is pointed out that the key role in decline is played by neighborhood "external diseconomies," which result from the way municipal services are financed, produced, and distributed in metropolitan areas. It is also pointed out…

  16. Stress in air traffic personnel : low-density towers and flight service stations.

    DOT National Transportation Integrated Search

    1977-09-01

    Stress and anxiety levels were measured in 10 air traffic control specialists (ATCS) at two low-traffic-density towers, Fayetteville (FYV), Arkansas, and Roswell (ROW), New Mexico, and in 24 flight service (FS) specialists at Oklahoma City (OKC), Okl...

  17. 14 CFR 1214.116 - Typical optional services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...

  18. 14 CFR § 1214.116 - Typical optional services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section § 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable... payload/orbiter integration and test. (e) Payload mission planning services, other than for launch...

  19. 14 CFR 1214.116 - Typical optional services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...

  20. 14 CFR 1214.116 - Typical optional services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...

  1. 14 CFR 1214.116 - Typical optional services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 1214.116 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.../orbiter integration and test. (e) Payload mission planning services, other than for launch, deployment and...

  2. Flight service specialist initial qualifications course : content validation of FAA Academy course 50232.

    DOT National Transportation Integrated Search

    1991-04-01

    This study evaluates the content validity of the Initial Qualifications Course provided to flight service specialists (FSS) by the FAA Academy. The purpose of FSS Initial Qualifications Course (FAA Academy course 50232) is to predict the student's pr...

  3. KSC-97pc352

    NASA Image and Video Library

    1997-02-21

    KENNEDY SPACE CENTER, Fla. -- The Space Shuttle orbiter Discovery touches down in darkness on Runway 15 of the KSC Shuttle Landing Facility, bringing to a close the 10-day STS-82 mission to service the Hubble Space Telescope (HST). Main gear touchdown was at 3:32:26 a.m. EST on February 21, 1997. It was the ninth nighttime landing in the history of the Shuttle program and the 35th landing at KSC. The first landing opportunity at KSC was waved off because of low clouds in the area. The seven-member crew performed a record-tying five back-to-back extravehicular activities (EVAs) or spacewalks to service the telescope, which has been in orbit for nearly seven years. Two new scientific instruments were installed, replacing two outdated instruments. Five spacewalks also were performed on the first servicing mission, STS-61, in December 1993. Only four spacewalks were scheduled for STS-82, but a fifth one was added during the flight to install several thermal blankets over some aging insulation covering three HST compartments containing key data processing, electronics and scientific instrument telemetry packages. Crew members are Mission Commander Kenneth D. Bowersox, Pilot Scott J. "Doc" Horowitz, Payload Commander Mark C. Lee, and Mission Specialists Steven L. Smith, Gregory J. Harbaugh, Joseph R. "Joe" Tanner and Steven A. Hawley. STS-82 was the 82nd Space Shuttle flight and the second mission of 1997

  4. Technicians Ray Smith and Raphael Rodriguez remove one of the Extravehicular Mobility Units from the Space Shuttle Discovery after its landing at NASA Dryden

    NASA Image and Video Library

    2005-08-12

    Flight Crew Systems Technicians Ray Smith and Raphael Rodriguez remove one of the Extravehicular Mobility Units, or EMUs, from the Space Shuttle Discovery after it's successful landing at NASA's Dryden Flight Research Center. The Space Shuttles receive post-flight servicing in the Mate-Demate Device (MDD) following landings at NASA's Dryden Flight Research Center, Edwards, California. The gantry-like MDD structure is used for servicing the shuttle orbiters in preparation for their ferry flight back to the Kennedy Space Center in Florida, including mounting the shuttle atop NASA's modified Boeing 747 Shuttle Carrier Aircraft. Space Shuttle Discovery landed safely at NASA's Dryden Flight Research Center at Edwards Air Force Base in California at 5:11:22 a.m. PDT, August 9, 2005, following the very successful 14-day STS-114 return to flight mission. During their two weeks in space, Commander Eileen Collins and her six crewmates tested out new safety procedures and delivered supplies and equipment the International Space Station. Discovery spent two weeks in space, where the crew demonstrated new methods to inspect and repair the Shuttle in orbit. The crew also delivered supplies, outfitted and performed maintenance on the International Space Station. A number of these tasks were conducted during three spacewalks. In an unprecedented event, spacewalkers were called upon to remove protruding gap fillers from the heat shield on Discovery's underbelly. In other spacewalk activities, astronauts installed an external platform onto the Station's Quest Airlock and replaced one of the orbital outpost's Control Moment Gyroscopes. Inside the Station, the STS-114 crew conducted joint operations with the Expedition 11 crew. They unloaded fresh supplies from the Shuttle and the Raffaello Multi-Purpose Logistics Module. Before Discovery undocked, the crews filled Raffeallo with unneeded items and returned to Shuttle payload bay. Discovery launched on July 26 and spent almost 14

  5. 76 FR 19267 - Pilot, Flight Instructor, and Pilot School Certification; Technical Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    .... No. 61-127] RIN 2120-AI86 Pilot, Flight Instructor, and Pilot School Certification; Technical... for pilots, flight instructors, ground instructors, and pilot schools. This document reinstates two... Aviation and Commercial Division, Flight Standards Service, Federal Aviation Administration, 800...

  6. Orion Launch Abort System Performance on Exploration Flight Test 1

    NASA Technical Reports Server (NTRS)

    McCauley, R.; Davidson, J.; Gonzalez, Guillermo

    2015-01-01

    This paper will present an overview of the flight test objectives and performance of the Orion Launch Abort System during Exploration Flight Test-1. Exploration Flight Test-1, the first flight test of the Orion spacecraft, was managed and led by the Orion prime contractor, Lockheed Martin, and launched atop a United Launch Alliance Delta IV Heavy rocket. This flight test was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety. This test included the first flight test of the Launch Abort System preforming Orion nominal flight mission critical objectives. NASA is currently designing and testing the Orion Multi-Purpose Crew Vehicle (MPCV). Orion will serve as NASA's new exploration vehicle to carry astronauts to deep space destinations and safely return them to earth. The Orion spacecraft is composed of four main elements: the Launch Abort System, the Crew Module, the Service Module, and the Spacecraft Adapter (Fig. 1). The Launch Abort System (LAS) provides two functions; during nominal launches, the LAS provides protection for the Crew Module from atmospheric loads and heating during first stage flight and during emergencies provides a reliable abort capability for aborts that occur within the atmosphere. The Orion Launch Abort System (LAS) consists of an Abort Motor to provide the abort separation from the Launch Vehicle, an Attitude Control Motor to provide attitude and rate control, and a Jettison Motor for crew module to LAS separation (Fig. 2). The jettison motor is used during a nominal launch to separate the LAS from the Launch Vehicle (LV) early in the flight of the second stage when it is no longer needed for aborts and at the end of an LAS abort sequence to enable deployment of the crew module's Landing Recovery System. The LAS also provides a Boost Protective Cover fairing that shields the crew module from debris and the aero-thermal environment during ascent. Although the Orion Program has tested a number of the critical systems of the Orion spacecraft on the ground, the launch environment cannot be replicated completely on Earth. A number of flight tests have been conducted and are planned to demonstrate the performance and enable certification of the Orion Spacecraft. Exploration Flight Test 1, the first flight test of the Orion spacecraft, was successfully flown on December 5, 2014 from Cape Canaveral Air Force Station's Space Launch Complex 37. Orion's first flight was a two-orbit, high-apogee, high-energy entry, low-inclination test mission used to validate and test systems critical to crew safety, such as heat shield performance, separation events, avionics and software performance, attitude control and guidance, parachute deployment and recovery operations. One of the key separation events tested during this flight was the nominal jettison of the LAS. Data from this flight will be used to verify the function of the jettison motor to separate the Launch Abort System from the crew module so it can continue on with the mission. The LAS nominal jettison event on Exploration Flight Test 1 occurred at six minutes and twenty seconds after liftoff (See Fig. 3). The abort motor and attitude control motors were inert for Exploration Flight Test 1, since the mission did not require abort capabilities. A suite of developmental flight instrumentation was included on the flight test to provide data on spacecraft subsystems and separation events. This paper will focus on the flight test objectives and performance of the LAS during ascent and nominal jettison. Selected LAS subsystem flight test data will be presented and discussed in the paper. Exploration Flight Test -1 will provide critical data that will enable engineering to improve Orion's design and reduce risk for the astronauts it will protect as NASA continues to move forward on its human journey to Mars. The lessons learned from Exploration Flight Test 1 and the other Flight Test Vehicles will certainly contribute to the vehicle architecture of a human-rated space launch vehicle.

  7. 14 CFR 1214.103 - Reimbursement for standard services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...

  8. 14 CFR 1214.103 - Reimbursement for standard services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...

  9. 14 CFR 1214.103 - Reimbursement for standard services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 5 2013-01-01 2013-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...

  10. 14 CFR 1214.103 - Reimbursement for standard services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Reimbursement for standard services. 1214.103 Section 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable...

  11. 14 CFR 1214.111 - Rendezvous services.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Rendezvous services. 1214.111 Section 1214.111 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214...

  12. Foale performs potable water analysis OPS in the SM during Expedition 8

    NASA Image and Video Library

    2003-11-07

    ISS008-E-05553 (7 November 2003) --- Astronaut C. Michael Foale, Expedition 8 mission commander and NASA ISS science officer, floats in front of the galley in the Zvezda Service Module on the International Space Station (ISS) as he fills a Crew Healthcare System (CheCSS) Water Microbiology (WMK) in-flight analysis bag from the potable warter dispenser.

  13. 14 CFR § 1214.115 - Standard services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...§ 1214.115 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214.... (d) A five-person flight crew: commander, pilot and three mission specialists. (e) Orbiter flight...

  14. IsoWAN: A NASA Science and Engineering Information and Services Framework

    NASA Technical Reports Server (NTRS)

    Korsmeyer, David J.; Chow, Edward T.; Conroy, Michael P.; Swanson, Keith (Technical Monitor)

    2000-01-01

    We believe that the next evolutionary step in supporting wide-area application and services delivery to customers is a network framework that provides for collocation of applications and services at distinct sites in the network, an interconnection between these sites that is performance optimized for these applications, and value-added services for applications. We use the term IsoWAN to describe an advanced, isolated network interconnect services framework that will enable applications to be more secure, and able to access and be in use in both local and remote environments. The main functions of an IsoWAN are virtual localization of application services, an application service interface, coordinated delivery of applications and associated data to the customer, and supporting collaborative application development for customers. An initial pilot network between three NASA Centers: Ames Research Center, the Jet Propulsion Laboratory, and Marshall Space Flight Center, has been built and its properties will be discussed.

  15. Low-cost space flight for attached payloads

    NASA Astrophysics Data System (ADS)

    Perkins, Frederick W.

    1991-07-01

    An important addition to the emerging commercial space sector is Standard Space Platforms Corporation's comprehensive low-cost flight service delivery system for small and developmental payloads. Standard provides a privately funded, proprietary, value-added transportation service which dramatically reduces cost and program duration for compliant payloads. It also provides a business-to-business service which is compatible with business investment decision timing and technology development cycles.

  16. CDR Altman and PLT Carey in airlock

    NASA Image and Video Library

    2002-03-07

    STS109-E-5672 (7 March 2002) --- Astronauts Scott D. Altman, mission commander, and Duane G. Carey, pilot, have remained inside Columbia's crew cabin all week while four crewmates have performed a series of space walks. However, the duo, seen here on the shuttle's flight deck, has had sparse leisure time, performing various interior duties in support of the extravehicular activity (EVA) designed for the servicing and upgrading of the Hubble Space Telescope (HST). The image was recorded with a digital still camera.

  17. High-Performance Tiled WMS and KML Web Server

    NASA Technical Reports Server (NTRS)

    Plesea, Lucian

    2007-01-01

    This software is an Apache 2.0 module implementing a high-performance map server to support interactive map viewers and virtual planet client software. It can be used in applications that require access to very-high-resolution geolocated images, such as GIS, virtual planet applications, and flight simulators. It serves Web Map Service (WMS) requests that comply with a given request grid from an existing tile dataset. It also generates the KML super-overlay configuration files required to access the WMS image tiles.

  18. KSC-08pd2090

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  19. KSC-08pd2069

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  20. KSC-08pd2068

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  1. KSC-08pd2065

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2062

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2060

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center prepare to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd2061

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to lift the Flight Support System for the Hubble Space Telescope from its transportation canister. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. KSC-08pd2066

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lowered onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. KSC-08pd2067

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is positioned onto a work platform by workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  7. KSC-08pd2091

    NASA Image and Video Library

    2008-07-21

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center remove the protective wrapping from the Flight Support System for the Hubble Space Telescope. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in early August. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  8. KSC-08pd2063

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  9. KSC-08pd2064

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Flight Support System for the Hubble Space Telescope is lifted from its transportation canister under the supervision of workers from NASA's Goddard Space Flight Center. The Flight Support System, or FSS, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Orbital Replacement Unit Carrier, or ORUC, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  10. 2015 Annual Report for the Flight Opportunities Program

    NASA Technical Reports Server (NTRS)

    Van Dijk, Alexander

    2015-01-01

    Welcome to this third edition of the Flight Opportunities program annual report. In this edition, we continue our story of pathfinding NASA's role in the partnership with the U.S. commercial space and space technology R&D communities to advance national space interests and develop technologies critical to NASA's future missions. 2015 was the year in which a planned change to our payload solicitation strategy saw its first tangible result. As you might remember from our 2014 annual report, in 2015 we set out to facilitate a more direct interaction between flight providers and technology developers by providing fixed funding awards to researchers to directly purchase the flight service(s) that best meet their needs. The selection and award of the first six REDDI-F1 flight grants to non-U.S. government researchers was an important milestone in this regard. From now on, using the REDDI-F1 solicitation appendix, the program will enable non-U.S. government researchers to directly purchase flight services on the emerging suborbital market. The same (or similar) commercial flight services will be available to NASA and other U.S. government agencies (OGA) through commercial contracts that NASA has established through our program. For the latter, our program is available to provide campaign management services, similar to the role we play(ed) for technology payloads remaining in our pool from earlier selections. The full impact of this broader strategic change will likely become more visible in the years ahead as our legacy pool gets depleted and we have implemented a new NASA- and OGA-specific call for proposals. One observation that can already be made after two rounds of REDDI-F1 solicitations is that through this change, the list of commercial flight service providers of interest to non-U.S. government researchers has grown from five in 2014 to nine in 2015. On the industry development front, our Announcement of Collaborative Opportunities (ACO) solicitation was promoted to an STMD-wide solicitation and released in 2015 in combination with the Tipping Point solicitation. A total of 22 awards was announced in November 2015, 12 of which are ACO awards, and six of these are funded by Flight Opportunities. Through these ACO awards, the program funds NASA technical expertise and NASA test facilities to aid industry partners in maturing key space technologies, in our case focusing on small launch vehicle technology development. Flight test activity in 2015 saw a steady 13 campaigns with 31 payload-flights (29 unique payloads). Thirteen new payloads were selected into the program in FY2015, and 14 payloads completed flight testing, bringing the total number of completed technology demonstration payloads to 69. Overall, we are pleased with the evolution and growth of the Flight Opportunities program and look forward to continued success in our partnership with the technology R&D community and the commercial space sector.

  11. 14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...

  12. 14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...

  13. 14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...

  14. 14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...

  15. 14 CFR 135.271 - Helicopter hospital emergency medical evacuation service (HEMES).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Helicopter hospital emergency medical....271 Helicopter hospital emergency medical evacuation service (HEMES). (a) No certificate holder may... certificate holder may assign a helicopter flight crewmember, and no flight crewmember may accept an...

  16. 47 CFR 87.349 - Frequencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for ground vehicle identification and collision avoidance; (3) No more than two hundred 1090 MHz... utility station at an airport served by a control tower, RCO or FAA flight service station is the frequency used by the control tower for ground traffic control or by the flight service station for...

  17. Tyurin and Williams in Zvezda Service module

    NASA Image and Video Library

    2007-04-21

    ISS014-E-19924 (21 April 2007) --- Cosmonaut Mikhail Tyurin (left), Expedition 14 flight engineer representing Russia's Federal Space Agency, and astronaut Sunita L. Williams, Expedition 15 flight engineer, drink beverages as they pose for a photo in the Zvezda Service Module of the International Space Station.

  18. NASA Ames Research Center R and D Services Directorate Biomedical Systems Development

    NASA Technical Reports Server (NTRS)

    Pollitt, J.; Flynn, K.

    1999-01-01

    The Ames Research Center R&D Services Directorate teams with NASA, other government agencies and/or industry investigators for the development, design, fabrication, manufacturing and qualification testing of space-flight and ground-based experiment hardware for biomedical and general aerospace applications. In recent years, biomedical research hardware and software has been developed to support space-flight and ground-based experiment needs including the E 132 Biotelemetry system for the Research Animal Holding Facility (RAHF), E 100 Neurolab neuro-vestibular investigation systems, the Autogenic Feedback Systems, and the Standard Interface Glove Box (SIGB) experiment workstation module. Centrifuges, motion simulators, habitat design, environmental control systems, and other unique experiment modules and fixtures have also been developed. A discussion of engineered systems and capabilities will be provided to promote understanding of possibilities for future system designs in biomedical applications. In addition, an overview of existing engineered products will be shown. Examples of hardware and literature that demonstrate the organization's capabilities will be displayed. The Ames Research Center R&D Services Directorate is available to support the development of new hardware and software systems or adaptation of existing systems to meet the needs of academic, commercial/industrial, and government research requirements. The Ames R&D Services Directorate can provide specialized support for: System concept definition and feasibility Mathematical modeling and simulation of system performance Prototype hardware development Hardware and software design Data acquisition systems Graphical user interface development Motion control design Hardware fabrication and high-fidelity machining Composite materials development and application design Electronic/electrical system design and fabrication System performance verification testing and qualification.

  19. Quality of life, health status, and health service utilization related to a new measure of health literacy: FLIGHT/VIDAS.

    PubMed

    Ownby, Raymond L; Acevedo, Amarilis; Jacobs, Robin J; Caballero, Joshua; Waldrop-Valverde, Drenna

    2014-09-01

    Researchers have identified significant limitations in some currently used measures of health literacy. The purpose of this paper is to present data on the relation of health-related quality of life, health status, and health service utilization to performance on a new measure of health literacy in a nonpatient population. The new measure was administered to 475 English- and Spanish-speaking community-dwelling volunteers along with existing measures of health literacy and assessments of health-related quality of life, health status, and healthcare service utilization. Relations among measures were assessed via correlations and health status and utilization was tested across levels of health literacy using ANCOVA models. The new health literacy measure is significantly related to existing measures of health literacy as well as to participants' health-related quality of life. Persons with lower levels of health literacy reported more health conditions, more frequent physical symptoms, and greater healthcare service utilization. The new measure of health literacy is valid and shows relations to measures of conceptually related constructs such as quality of life and health behaviors. FLIGHT/VIDAS may be useful to researchers and clinicians interested in a computer administered and scored measure of health literacy. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.

  20. Mature data transport and command management services for the Space Station

    NASA Technical Reports Server (NTRS)

    Carper, R. D.

    1986-01-01

    The duplex space/ground/space data services for the Space Station are described. The need to separate the uplink data service functions from the command functions is discussed. Command management is a process shared by an operation control center and a command management system and consists of four functions: (1) uplink data communications, (2) management of the on-board computer, (3) flight resource allocation and management, and (4) real command management. The new data service capabilities provided by microprocessors, ground and flight nodes, and closed loop and open loop capabilities are studied. The need for and functions of a flight resource allocation management service are examined. The system is designed so only users can access the system; the problems encountered with open loop uplink access are analyzed. The procedures for delivery of operational, verification, computer, and surveillance and monitoring data directly to users are reviewed.

  1. DTFT-1: Analysis of the first USV flight test

    NASA Astrophysics Data System (ADS)

    Russo, G.

    2009-11-01

    The first dropped transonic flight test (DTFT) of the USV Program, performed with Castor, the first of the two spacecrafts developed within the USV Program, was performed on Saturday 24th February 2007, from Tortolì Airport in Sardinia. At 8:30 a.m. the 340 000 m 3 stratospheric balloon lifted off from the East coast of Sardinia, bringing the flying test bed (FTB) up to 20.2 km before release within the isolated sea polygon controlled by Italian air force test range in Salto di Quirra (PISQ). The mission ended at 10:30 a.m. with the splash-down of the space vehicle. The flight itself was very good, with a nose-up manoeuvre under transonic conditions, reaching a maximum Mach as high as 1.08. The mission target was completely achieved as some 2 million measures were taken related to flight data, housekeeping, as well as 500 aerodynamic and structural experimental sensors. Unfortunately, the vehicle has been damaged more than expected during splash-down. Many national and international institutions and industries contributed to the mission carrying out, under the supervision and technical guide of CIRA: Italian Space Agency, Italian Air Force, Italian Navy, Italian Civil Aviation Authority, Italian Company for Air Navigation Services, Port Authorities, European Space Agency, Techno System Dev., Vitrociset, Carlo Gavazzi Space, Space Software Italia, Alcatel Alenia Space Italy, ISL-Altran Group. The paper reports the actual status of post-flight data analysis.

  2. Flight Test Results for the HST Orbital Systems Test (HOST) Capillary Pump Loop Cooling System

    NASA Technical Reports Server (NTRS)

    Buchko, M.; Kaylor, M.; Kroliczek, E.; Ottenstein, L.

    1999-01-01

    The Near Infrared Camera and Multi Object Spectrometer (NICMOS) was installed in the Hubble Space Telescope (MST) in February 1997. Shortly thereafter, the instrument experienced a thermal short in its solid nitrogen dewar system which will significantly shorten the instrument's useful life. A reverse Brayton cycle mechanical refrigerator will be installed during the Third Servicing Mission (SM3) to provide cooling for the instrument, and thereby extend its operations. A Capillary Pump Loop (CPL) and radiator system was designed, built and tested to remove up to 500 watts of heat from the mechanical cryocooler and its associated electronics. The HST Orbital Systems Test (HOST) platform was flown on the Space Shuttle Discovery (STS-95) as a flight demonstration of the cryocooler system, CPL control electronics, and the CPL/Radiator. This paper will present the flight test results and thermal performance of the CPL system in detail.

  3. KSC-2013-3299

    NASA Image and Video Library

    2013-08-02

    Edwards, Calif. – ED13-0266-013- Sierra Nevada Corporation, or SNC, team members prepare for 60 mph tow tests of the company's Dream Chaser flight vehicle on taxi and runways at NASA's Dryden Flight Research Center at Edwards Air Force Base in California. Ground testing at 10, 20, 40 and 60 miles per hour is helping the company validate the performance of the spacecraft's braking and landing systems prior to captive-carry and free-flight tests scheduled for later this year. SNC is continuing the development of its Dream Chaser spacecraft under the agency's Commercial Crew Development Round 2, or CCDev2, and Commercial Crew Integrated Capability, or CCiCap, phases, which are intended to lead to the availability of commercial human spaceflight services for government and commercial customers. To learn more about CCP and its industry partners, visit www.nasa.gov/commercialcrew. Image credit: NASA/Ken Ulbrich

  4. 14 CFR § 1214.103 - Reimbursement for standard services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 5 2014-01-01 2014-01-01 false Reimbursement for standard services. § 1214.103 Section § 1214.103 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government...

  5. A Communication Skills Training Course for Trans World Airlines Flight Service Managers.

    ERIC Educational Resources Information Center

    Hurst, Katherine

    A project analyzed, designed, developed, implemented, and evaluated a training program that would enable Trans World Airlines flight service managers to develop effective communication skills. The instructional systems design process was used throughout. The analysis identified the need for communication training for the target population. Program…

  6. 78 FR 35313 - Notice of Flight 93 Advisory Commission Meeting Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... Flight 93 Advisory Commission Meeting Change AGENCY: National Park Service, Interior. ACTION: Notice of Public Meeting Date Change. SUMMARY: Notice is hereby given of a meeting of the Flight 93 Advisory Commission, on September 10, 2013, Flight 93 National Memorial Office, 109 West Main Street, Somerset, PA...

  7. 76 FR 4131 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-24

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the February 5, 2011, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force...

  8. 75 FR 3488 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... forth the date of the February 6, 2010 meeting of the Flight 93 Advisory Commission. DATES: The public.... (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting...

  9. 76 FR 64102 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the November 5, 2011, meeting of the Flight 93 Advisory Commission. DATES: The....m. (Eastern). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West...

  10. 75 FR 43199 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the August 7, 2010, meeting of the Flight 93 Advisory Commission. DATES: The.... (Eastern). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting...

  11. 76 FR 18778 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... forth the date of the May 7, 2011, meeting of the Flight 93 Advisory Commission. DATES: The public...). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main Street Suite...

  12. 75 FR 17158 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the May 1, 2010, meeting of the Flight 93 Advisory Commission. DATES: The public...). The Commission will meet jointly with the Flight 93 Memorial Task Force. Location: The meeting will be...

  13. 77 FR 24220 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... sets forth the date of the May 5, 2012, for meeting of the Flight 93 Advisory Commission. DATES: The.... (Eastern). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main...

  14. 77 FR 3793 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the February 4, 2012, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). Location: The meeting will be held via teleconference at the Flight 93 National...

  15. An approach to ground based space surveillance of geostationary on-orbit servicing operations

    NASA Astrophysics Data System (ADS)

    Scott, Robert (Lauchie); Ellery, Alex

    2015-07-01

    On Orbit Servicing (OOS) is a class of dual-use robotic space missions that could potentially extend the life of orbiting satellites by fuel replenishment, repair, inspection, orbital maintenance or satellite repurposing, and possibly reduce the rate of space debris generation. OOS performed in geostationary orbit poses a unique challenge for the optical space surveillance community. Both satellites would be performing proximity operations in tight formation flight with separations less than 500 m making atmospheric seeing (turbulence) a challenge to resolving a geostationary satellite pair when viewed from the ground. The two objects would appear merged in an image as the resolving power of the telescope and detector, coupled with atmospheric seeing, limits the ability to resolve the two objects. This poses an issue for obtaining orbital data for conjunction flight safety or, in matters pertaining to space security, inferring the intent and trajectory of an unexpected object perched very close to one's satellite asset on orbit. In order to overcome this problem speckle interferometry using a cross spectrum approach is examined as a means to optically resolve the client and servicer's relative positions to enable a means to perform relative orbit determination of the two spacecraft. This paper explores cases where client and servicing satellites are in unforced relative motion flight and examines the observability of the objects. Tools are described that exploit cross-spectrum speckle interferometry to (1) determine the presence of a secondary in the vicinity of the client satellite and (2) estimate the servicing satellite's motion relative to the client. Experimental observations performed with the Mont Mégantic 1.6 m telescope on co-located geostationary satellites (acting as OOS proxy objects) are described. Apparent angular separations between Anik G1 and Anik F1R from 5 to 1 arcsec were observed as the two satellites appeared to graze one another. Data reduction using differential angular measurements derived from speckle images collected by the 1.6 m telescope produced relative orbit estimates with better than 90 m accuracy in the cross-track and in-track directions but exhibited highly variable behavior in the radial component from 50 to 1800 m. Simulations of synthetic tracking data indicated that the radial component requires approximately six hours of tracking data for an Extended Kalman Filter to converge on an relative orbit estimate with less than 100 m overall uncertainty. The cross-spectrum approach takes advantage of the Fast Fourier Transform (FFT) permitting near real-time estimation of the relative orbit of the two satellites. This also enables the use of relatively larger detector arrays (>106 pixels) helping to ease acquisition process to acquire optical angular data.

  16. SpaceX Falcon Heavy Demo Flight - Booster Separation

    NASA Image and Video Library

    2018-02-06

    The SpaceX Falcon Heavy rocket’s two side cores separate from the center core as the vehicle performs its demonstration flight. The rocket lifted off at 3:45 p.m. EST from Launch Complex 39A at NASA's Kennedy Space Center in Florida. This is a significant milestone for the world's premier multi-user spaceport. In 2014, NASA signed a property agreement with SpaceX for the use and operation of the center's pad 39A, where the company has launched Falcon 9 rockets and prepared for the first Falcon Heavy. NASA also has Space Act Agreements in place with partners, such as SpaceX, to provide services needed to process and launch rockets and spacecraft.

  17. Comparison of nitrile gloves and nitrile over Nomex gloves.

    PubMed

    Vorih, Deirdre Cronin; Bolton, Lauri D; Marcelynas, James; Nowicki, Thomas A; Jacobs, Lenworth; Robinson, Kenneth J

    2009-01-01

    Aeromedical flight crews must perform many tasks in flight requiring manual dexterity and fine precision. A common perception is that safety-enhancing fire-retardant gloves compromise patient care if worn during such tasks by providing added bulk and barrier to the hand. This study is a quantitative and qualitative analysis of this possible compromise to patient care. Sixteen practicing flight nurses and respiratory therapists were asked to perform 10 different standard patient care tasks while wearing either nitrile gloves or a nitrile-Nomex glove pair. Tasks were timed, rated as completed successfully or not, and were subsequently judged subjectively by the participants. Whereas the time required to insert an intravenous catheter and to insert a central line while wearing only nitrile gloves was significantly faster than when wearing both gloves, the time to perform all other tasks was not significantly different. In subjective ratings, the nitrile glove alone was scored significantly better than the two-glove combination by the study participants. Comfort, dexterity, tactile discrimination, and ease of use were all adversely affected by wearing a Nomex glove under a nitrile glove. Although the differences in times for most tasks may not be clinically significant, the difference in the subjective parameters may be great enough to cause helicopter emergency medical services (HEMS) practitioners to not wear Nomex gloves under nitrile gloves while performing procedures.

  18. Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

    NASA Technical Reports Server (NTRS)

    Stengle, Thomas; Hoge, Susan

    2008-01-01

    The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

  19. Development and validation of cryogenic foam insulation for LH2 subsonic transports

    NASA Technical Reports Server (NTRS)

    Anthony, F. M.; Colt, J. Z.; Helenbrook, R. G.

    1981-01-01

    Fourteen foam insulation specimens were tested. Some were plain foam while others contained flame retardants, chopped fiberglass reinforcement and/or vapor barriers. The thermal performance of the insulation was determined by measuring the rate at which LH2 boiled from an aluminum tank insulated with the test material. The test specimens were approximately 50 mm (2 in.) thick. They were structurally scaled so that the test cycle would duplicate the maximum thermal stresses predicted for the thicker insulation of an aircraft liquid hydrogen fuel tank during a typical subsonic flight. The simulated flight cycle of approximately 10 minutes duration heated the other insulation surface to 316 K (110 F) and cooled it to 226 K (20 F) while the inner insulation surface remained at liquid hydrogen temperature of 20 K (-423 F). Two urethane foam insulations exceeded the initial life goal of 2400 simulated flight cycles and sustained 4400 cycles with only minor damage. The addition of fiberglass reinforcement of flame retardant materials to an insulation degraded thermal performance and/or the life of the foam material. Installation of vapor barriers enhanced the structural integrity of the material but did not improve thermal performance. All of the foams tested were available materials; none were developed specifically for LH2 service.

  20. The Evolution of Extravehicular Activity Operations to Lunar Exploration Based on Operational Lessons Learned During 2009 NASA Desert RATS Field Testing

    NASA Technical Reports Server (NTRS)

    Bell, Ernest R., Jr.; Welsh, Daren; Coan, Dave; Johnson, Kieth; Ney, Zane; McDaniel, Randall; Looper, Chris; Guirgis, Peggy

    2010-01-01

    This paper will present options to evolutionary changes in several philosophical areas of extravehicular activity (EVA) operations. These areas will include single person verses team EVAs; various loss of communications scenarios (with Mission Control, between suited crew, suited crew to rover crew, and rover crew A to rover crew B); EVA termination and abort time requirements; incapacitated crew ingress time requirements; autonomous crew operations during loss of signal periods including crew decisions on EVA execution (including decision for single verses team EVA). Additionally, suggestions as to the evolution of the make-up of the EVA flight control team from the current standard will be presented. With respect to the flight control team, the major areas of EVA flight control, EVA Systems and EVA Tasks, will be reviewed, and suggested evolutions of each will be presented. Currently both areas receive real-time information, and provide immediate feedback during EVAs as well as spacesuit (extravehicular mobility unit - EMU) maintenance and servicing periods. With respect to the tasks being performed, either EMU servicing and maintenance, or the specific EVA tasks, daily revising of plans will need to be able to be smoothly implemented to account for unforeseen situations and findings. Many of the presented ideas are a result of lessons learned by the NASA Johnson Space Center Mission Operations Directorate operations team support during the 2009 NASA Desert Research and Technology Studies (Desert RATS). It is important that the philosophy of both EVA crew operations and flight control be examined now, so that, where required, adjustments can be made to a next generation EMU and EVA equipment that will complement the anticipated needs of both the EVA flight control team and the crews.

  1. Airline Transport Pilot, Aircraft Dispatcher, and Flight Navigator Knowledge Test Guide

    DOT National Transportation Integrated Search

    1995-01-01

    The Flight Standards Service of the Federal Aviation Administration (FAA) has developed this guide to help applicants meet the knowledge requirements for airline transport pilot, aircraft dispatcher, and flight navigator certification. This guide con...

  2. Orbital Express Advanced Video Guidance Sensor: Ground Testing, Flight Results and Comparisons

    NASA Technical Reports Server (NTRS)

    Pinson, Robin M.; Howard, Richard T.; Heaton, Andrew F.

    2008-01-01

    Orbital Express (OE) was a successful mission demonstrating automated rendezvous and docking. The 2007 mission consisted of two spacecraft, the Autonomous Space Transport Robotic Operations (ASTRO) and the Next Generation Serviceable Satellite (NEXTSat) that were designed to work together and test a variety of service operations in orbit. The Advanced Video Guidance Sensor, AVGS, was included as one of the primary proximity navigation sensors on board the ASTRO. The AVGS was one of four sensors that provided relative position and attitude between the two vehicles. Marshall Space Flight Center was responsible for the AVGS software and testing (especially the extensive ground testing), flight operations support, and analyzing the flight data. This paper briefly describes the historical mission, the data taken on-orbit, the ground testing that occurred, and finally comparisons between flight data and ground test data for two different flight regimes.

  3. Spaceflight Operations Services Grid (SOSG)

    NASA Technical Reports Server (NTRS)

    Bradford, Robert N.; Thigpen, William W.

    2004-01-01

    In an effort to adapt existing space flight operations services to new emerging Grid technologies we are developing a Grid-based prototype space flight operations Grid. This prototype is based on the operational services being provided to the International Space Station's Payload operations located at the Marshall Space Flight Center, Alabama. The prototype services will be Grid or Web enabled and provided to four user communities through portal technology. Users will have the opportunity to assess the value and feasibility of Grid technologies to their specific areas or disciplines. In this presentation descriptions of the prototype development, User-based services, Grid-based services and status of the project will be presented. Expected benefits, findings and observations (if any) to date will also be discussed. The focus of the presentation will be on the project in general, status to date and future plans. The End-use services to be included in the prototype are voice, video, telemetry, commanding, collaboration tools and visualization among others. Security is addressed throughout the project and is being designed into the Grid technologies and standards development. The project is divided into three phases. Phase One establishes the baseline User-based services required for space flight operations listed above. Phase Two involves applying Gridlweb technologies to the User-based services and development of portals for access by users. Phase Three will allow NASA and end users to evaluate the services and determine the future of the technology as applied to space flight operational services. Although, Phase One, which includes the development of the quasi-operational User-based services of the prototype, development will be completed by March 2004, the application of Grid technologies to these services will have just begun. We will provide status of the Grid technologies to the individual User-based services. This effort will result in an extensible environment that incorporates existing and new spaceflight services into a standards-based framework providing current and future NASA programs with cost savings and new and evolvable methods to conduct science. This project will demonstrate how the use of new programming paradigms such as web and grid services can provide three significant benefits to the cost-effective delivery of spaceflight services. They will enable applications to operate more efficiently by being able to utilize pooled resources. They will also permit the reuse of common services to rapidly construct new and more powerful applications. Finally they will permit easy and secure access to services via a combination of grid and portal technology by a distributed user community consisting of NASA operations centers, scientists, the educational community and even the general population as outreach. The approach will be to deploy existing mission support applications such as the Telescience Resource Kit (TReK) and new applications under development, such as the Grid Video Distribution System (GViDS), together with existing grid applications and services such as high-performance computing and visualization services provided by NASA s Information Power Grid (IPG) in the MSFC s Payload Operations Integration Center (POIC) HOSC Annex. Once the initial applications have been moved to the grid, a process will begin to apply the new programming paradigms to integrate them where possible. For example, with GViDS, instead of viewing the Distribution service as an application that must run on a single node, the new approach is to build it such that it can be dispatched across a pool of resources in response to dynamic loads. To make this a reality, reusable services will be critical, such as a brokering service to locate appropriate resource within the pool. This brokering service can then be used by other applications such as the TReK. To expand further, if the GViDS application is constructed using a services-based mel, then other applications such as the Video Auditorium can then use GViDS as a service to easily incorporate these video streams into a collaborative conference. Finally, as these applications are re-factored into this new services-based paradigm, the construction of portals to integrate them will be a simple process. As a result, portals can be tailored to meet the requirements of specific user communities.

  4. Nitrogen oxides at the UTLS: Combining observations from research aircraft and in-service aircraft

    NASA Astrophysics Data System (ADS)

    Ziereis, Helmut; Stratmann, Greta; Schlager, Hans; Gottschaldt, Klaus-Dirk; Rauthe-Schöch, Armin; Zahn, Andreas; Hoor, Peter; van, Peter

    2016-04-01

    Nitrogen oxides have a decisive influence on the chemistry of the upper troposphere and lower stratosphere. They are key constituents of several reaction chains influencing the production of ozone. They also play an essential role in the cycling of hydroxyl radicals and therefore influence the lifetime of methane. Due to their short lifetime and their variety of sources there is still a high uncertainty about the abundance of nitrogen oxides in the UTLS. Dedicated aircraft campaigns aim to study specific atmospheric questions like lightning, long range transport or aircraft emissions. Usually, within a short time period comprehensive measurements are performed within a more or less restricted region. Therefore, especially trace constituents like nitrogen oxides with short lifetime and a variety of different sources are not represented adequately. On the other hand, routine measurements from in-service aircraft allow observations over longer time periods and larger regions. However, it is nearly impossible to influence the scheduling of in-service aircraft and thereby time and space of the observations. Therefore, the combination of dedicated aircraft campaigns and routine observations might supplement each other. For this study we combine nitrogen oxides data sets obtained with the IAGOS-CARIBIC (Civil Aircraft for the Regular Investigation of the Atmosphere Based on an Instrument Container) flying laboratory and with the German research aircraft HALO (High altitude and long range research aircraft). Data have been acquired within the IAGOS-CARIBIC project on a monthly base using a Lufthansa Airbus A340-600 since December 2004. About four flights are performed each month covering predominantly northern mid-latitudes. Additional flights have been conducted to destinations in South America and South Africa. Since 2012 HALO has been operational. Nitrogen oxides measurements have been performed during six missions covering mid latitudes, tropical as well as Polar Regions. With HALO data can also be obtained at altitudes above the flight levels of commercial airliners. First results combining the nitrogen oxides data sets of both platforms are shown, analysing the temporal and regional distribution of nitrogen oxides at the UTLS.

  5. Prospective Architectures for Onboard vs Cloud-Based Decision Making for Unmanned Aerial Systems

    NASA Technical Reports Server (NTRS)

    Sankararaman, Shankar; Teubert, Christopher

    2017-01-01

    This paper investigates propsective architectures for decision-making in unmanned aerial systems. When these unmanned vehicles operate in urban environments, there are several sources of uncertainty that affect their behavior, and decision-making algorithms need to be robust to account for these different sources of uncertainty. It is important to account for several risk-factors that affect the flight of these unmanned systems, and facilitate decision-making by taking into consideration these various risk-factors. In addition, there are several technical challenges related to autonomous flight of unmanned aerial systems; these challenges include sensing, obstacle detection, path planning and navigation, trajectory generation and selection, etc. Many of these activities require significant computational power and in many situations, all of these activities need to be performed in real-time. In order to efficiently integrate these activities, it is important to develop a systematic architecture that can facilitate real-time decision-making. Four prospective architectures are discussed in this paper; on one end of the spectrum, the first architecture considers all activities/computations being performed onboard the vehicle whereas on the other end of the spectrum, the fourth and final architecture considers all activities/computations being performed in the cloud, using a new service known as Prognostics as a Service that is being developed at NASA Ames Research Center. The four different architectures are compared, their advantages and disadvantages are explained and conclusions are presented.

  6. Air ambulance nurses as expert supplement to local emergency services.

    PubMed

    Wisborg, Torben; Bjerkan, Bjørn

    2014-01-01

    Flight nurses in the Norwegian National Air Ambulance Service are specialist nurse anesthetists or intensive care nursing specialists. For air ambulance bases far from hospitals, these nurses present otherwise unavailable competencies. This study reports a 6-year experience with flight nurse participation in local emergencies beyond the transportation phase. The fixed-wing air ambulance base in Alta, Northern Norway (20,000 inhabitants), with 2 aircraft and 2 on-call teams is 150 km by road from the nearest hospital. We did a prospective registration of all emergency nonflight missions near the air ambulance base from January 1, 2005, to December 31, 2010. The 217 completed missions corresponded to 3 missions per month, half during daytime. Twenty-three percent of patients were under age 18, injury rate was high (36%), 63% had potentially or manifest life-threatening conditions, and 11% died during treatment. One third of all missions (67/217) resulted in an air ambulance flight to the hospital. Mission frequency did not significantly reduce flight availability, and precision in case selection for this special service was good. The use of flight nurses in the local community promotes equal access to advanced medical services for populations far from hospitals. Copyright © 2014 Air Medical Journal Associates. Published by Elsevier Inc. All rights reserved.

  7. Commander Kenneth D. Bowersox looks out the aft flight deck window

    NASA Image and Video Library

    1997-02-12

    S82-E-5007 (12 Feb. 1997) --- Astronaut Kenneth D. Bowersox, who served as pilot for the 1993 servicing mission to the Hubble Space Telescope (HST) appears to be pondering scheduled duties when the Space Shuttle Discovery makes a rendezvous in space with HST later in the week. Bowersox is mission commander and will remain in the Space Shuttle Discovery's cabin while four crew mates at various times perform Extravehicular Activities (EVA) to accomplish a series of servicing tasks on the giant telescope. This view was taken with an Electronic Still Camera (ESC).

  8. Evaluation of Composite Components on the Bell 206L and Sikorsky S-76 Helicopters

    NASA Technical Reports Server (NTRS)

    Baker, Donald J.

    1990-01-01

    Progress on two programs to evaluate structural composite parts in flight service on Bell 206L and Sikorsky S-76 commercial helicopters is described. Forty ship sets of composite parts that include the litter door, baggage door, forward fairing, and vertical fin were installed on Bell Model 206L helicopters that are operating in widely different climates. Part installation started in 1981 and selected parts are being removed and tested at prescribed intervals over a 10 yr evaluation. Four horizontal stabilizers and eleven tail rotor spars that are production parts on the S-76 helicopter are being tested after prescribed periods of service to determine the effects of the operating environment on their performance. Concurrent with the flight evaluation, materials used to fabricate the parts are being exposed in ground racks and tested at specified intervals to determine the effects of outdoor environments. Results achieved from 123,000 hrs of accumulated service on the Bell 206L parts and 53,000 hrs on the Sikorsky S-76 parts are reported. Seventy-eight Bell 206L parts were removed and tested statically. Results of 7 yrs of ground exposure of materials used to make the Bell 206L parts are presented.

  9. A Whitham-Theory Sonic-Boom Analysis of the TU-144 Aircraft at a Mach Number of 2.2

    NASA Technical Reports Server (NTRS)

    Mack, Robert J.

    1999-01-01

    Officially, the Tu-144 was the first supersonic-cruise, passenger-carrying aircraft to enter commercial service. Design, construction, and testing were carried out by the Soviet Union, flight certification was by the Soviet Union, and the only regular passenger flights were scheduled and flown across the territory of the Soviet Union. Although it was not introduced to international passenger service, there were many significant engineering accomplishments achieved in the design, production, and flight of this aircraft. Development of the aircraft began with a prototype stage. Systematic testing and redesign led to a production aircraft in discrete stages that measurably improved the performance of the aircraft from the starting concept to final aircraft certification. It flew in competition with the English-French Concorde for a short time, but was withdrawn from national commercial service due to a lack of interest by airlines outside the Soviet Union. NASA became interested in the Tu- 144 aircraft when it was offered for use as a flying "testbed" in the study of operating characteristics of a supersonic-cruise commercial airplane. Since it had been in supersonic-cruise service, the Tu- 144 had operational characteris'tics similar to those anticipated in the conceptual aircraft designs being studied by the United States aircraft companies. In addition to the other operational tests being conducted on the Tu-144 aircraft, it was proposed that two sets of sonic-boom pressure signature measurements be made. The first set would be made on the ground, using techniques and devices similar to those in reference I and many other subsequent studies. A second set would be made in the air with an instrumented aircraft flying close under the Tu-144 in supersonic flight. Such in-flight measurements would require pressure gages that were capable of accurately recording the flow-field overpressures generated by the Tu- 144 at relatively close distances under the vehicle. Therefore, an analysis of the Tu-144 was made to obtain predictions of pressure signature shape and shock strengths at cruise conditions so that the range and characteristics of the required pressure gages could be determined well in advance of the tests. Cancellation of the sonic-boom signature measurement part of the tests removed the need for these pressure gages. Since CFD methods would be used to analyze the aerodynamic performance of the Tu-144 and make similar pressure signature predictions, the relatively quick and simple Whitham-theory pressure signature predictions presented in this paper could be used for comparisons. Pressure signature predictions of sonic-boom disturbances from the Tu- 144 aircraft were obtained from geometry derived from a three-view description of the production aircraft. The geometry was used to calculate aerodynamic performance characteristics at supersonic-cruise conditions. These characteristics and Whitham/Walkden sonic-boom theory were employed to obtain F-functions and flow-field pressure signature predictions at a Mach number of 2.2, at a cruise altitude of 61000 feet, and at a cruise weight of 350000 pounds.

  10. 77 FR 37709 - Notice of July 28, 2012, Meeting for Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-22

    ..., 2012, Meeting for Flight 93 National Memorial Advisory Commission AGENCY: National Park Service... the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory Commission will be held... held at the Flight 93 National Memorial Office, 109 West Main Street Suite 104, Somerset, PA 15501...

  11. 78 FR 6129 - Notice of Flight 93 Advisory Commission Meetings for Calendar Year 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Flight 93 Advisory Commission Meetings for Calendar Year 2013 AGENCY: National Park Service, Interior... November 2, 2013, meetings of the Flight 93 Advisory Commission. DATES: The public meeting of the Advisory...). Location: The meeting will be held at the Flight 93 National Memorial Office, 109 West Main Street, Suite...

  12. 14 CFR 398.7 - Timing of flights.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...

  13. 14 CFR 398.7 - Timing of flights.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...

  14. 14 CFR 398.7 - Timing of flights.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... reasonableness of the time in view of the purpose for which the local passengers are traveling. If travel is primarily to connect with other flights at the hub, local flight times should be designed to link with those.... To qualify as essential air service, flights must depart at reasonable times, considering the needs...

  15. 14 CFR § 1214.104 - Reimbursement for optional services.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FLIGHT General Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government... will be escalated in accordance with the provisions of § 1214.103(d). (c) Schedules of payments. NASA... launch agreement at the time a particular optional service is agreed to between the customer and NASA. (d...

  16. Williams with TVIS hardware in Zvezda Service module

    NASA Image and Video Library

    2007-02-27

    ISS014-E-15349 (27 Feb. 2007) --- Assisted by the weightlessness of space, astronaut Sunita L. Williams, Expedition 14 flight engineer, hoists the Treadmill Vibration Isolation System (TVIS). She took a moment to pose for a photo during routine in-flight maintenance (IFM) on TVIS in the Zvezda Service Module of the International Space Station.

  17. 47 CFR 87.189 - Requirements for public correspondence equipment and operations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES AVIATION SERVICES Aircraft Stations § 87.189 Requirements for... continuous watch must be maintained on the frequencies used for safety and regularity of flight while public... interfere with message pertaining to safety of life and property or regularity of flight, or when ordered by...

  18. Voss with soldering tool in Service Module

    NASA Image and Video Library

    2001-03-28

    ISS002-E-5068 (28 March 2001) --- Astronaut James S. Voss, Expedition Two flight engineer, prepares to use a soldering tool for a maintenance task in the Zvezda Service Module onboard the International Space Station (ISS). Astronaut Susan J. Helms, flight engineer, is in the background. The image was recorded with a digital still camera.

  19. 47 CFR 87.349 - Frequencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... stations on a noninterference basis at airports which have a part-time control tower, part-time RCO or part-time FAA flight service station and a unicom. (c) At airports which have a unicom but no control tower... described in subpart G of this part. (d) At airports which have no control tower, RCO, flight service...

  20. Images of flight nursing in Australia: A study using institutional ethnography.

    PubMed

    Brideson, Genevieve; Willis, Eileen; Mayner, Lidia; Chamberlain, Diane J

    2016-03-01

    Pictures speak a thousand words. The traditional romantic image of an Australian aeromedical service is a male doctor and male pilot, out to rescue the male stockman from the red dust of the Australian outback. However, the reality is considerably different, particularly in the current context of the Australian healthcare system. This paper examines the images of flight nursing using a critical lens. The images are derived from popular literature sources from the early 1940s through to the present. A textual analysis of the images of flight nursing using the methodology of institutional ethnography reveals a number of themes including the glamorous, the romantic, and the heroic nurse. This study illustrates that the way these nurses are portrayed within popular literature mirrors the Australian cultural ethic of heroic bush pioneer, yet at the same time the work these nurses do is undervalued by various omissions and misrepresentations. The results from this study have the potential to significantly improve recognition of the work performed by flight nurses and to challenge incorrect cultural myths. © 2015 Wiley Publishing Asia Pty Ltd.

  1. The right wing of the LEFT airplane

    NASA Technical Reports Server (NTRS)

    Powell, Arthur G.

    1987-01-01

    The NASA Leading-Edge Flight Test (LEFT) program addressed the environmental issues which were potential problems in the application of Laminar Flow Control (LFC) to transport aircraft. These included contamination of the LFC surface due to dirt, rain, insect remains, snow, and ice, in the critical leading-edge region. Douglas Aircraft Company designed and built a test article which was mounted on the right wing of the C-140 JetStar aircraft. The test article featured a retractable leading-edge high-lift shield for contamination protection and suction through perforations on the upper surface for LFC. Following a period of developmental flight testing, the aircraft entered simulated airline service, which included exposure to airborne insects, heavy rain, snow, and icing conditions both in the air and on the ground. During the roughly 3 years of flight testing, the test article has consistently demonstrated laminar flow in cruising flight. The experience with the LEFT experiment was summarized with emphasis on significant test findings. The following items were discussed: test article design and features; suction distribution; instrumentation and transition point reckoning; problems and fixes; system performance and maintenance requirements.

  2. Flight service evaluation of two aluminum-brazed titanium spoilers

    NASA Technical Reports Server (NTRS)

    Boyer, R. R.

    1984-01-01

    The long-term service evaluation of two aluminum-brazed titanium (ABTi) honeycomb flight spoilers was concluded. The two spoilers had about 7.5 years of commercial flight experience on All Nippon Airways Model 737 aircraft. All Nippon Airways was selected because Japan has one of the most severe marine-industrial environments in the world. The results indicated that both flight spoilers still had the same load-carrying capability as when they were originally installed. No direct evidence of any corrosion was observed on either spoiler. Another significant accomplishment of this effort was the development of a braze design for efficiently distributing point loads from the fittings and skin into the honeycomb core.

  3. 75 FR 65029 - Flight 93 National Memorial Advisory Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... DEPARTMENT OF THE INTERIOR National Park Service Flight 93 National Memorial Advisory Commission... notice sets forth the date of the November 13, 2010, meeting of the Flight 93 Advisory Commission. DATES.... to 1 p.m. (Eastern). The [[Page 65030

  4. 14 CFR 91.501 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...

  5. 14 CFR 91.501 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...

  6. 14 CFR 91.501 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...

  7. 14 CFR 91.501 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...

  8. 14 CFR 91.501 - Applicability.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... (8) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An... AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Large and Turbine-Powered Multiengine...) Ferry or training flights; (2) Aerial work operations such as aerial photography or survey, or pipeline...

  9. High-performance 4x4-inch AMLCD for avionic applications

    NASA Astrophysics Data System (ADS)

    Syroid, Daniel D.; Hansen, Glenn A.; Boling, Ed

    1996-05-01

    There is a need for high performance flat panel displays to replace and upgrade the electromechanical flight indicators and CRT based displays used in the cockpits of many older aircraft that are in active service today. The need for replacement of these older generation instruments is well known in the industry and was discussed in a previous paper by Duane Grave of Rockwell Collins. Furthermore, because of the limited activity in new aircraft development today, the need to upgrade existing aircraft avionics is accelerating. Many of the electromechanical instruments currently provide flight indications to the pilot and include horizontal situation (HSI) and attitude director indicators (ADI). These instruments are used on both military and commercial aircraft. The indicators are typically housed in a 5ATI case that slides into a 5 inch square opening in the cockpit. Image Quest has developed a 4 by 4 inch active area, flight quality, high resolution, full color, high luminance, wide temperature range display module based on active matrix liquid crystal display (AMLCD) technology that has excellent contrast in full sunlight. The display module is well suited for use in electronic instruments to replace or upgrade the electro-mechanical 5ATI flight indicators. THe AMLCD based display offers greatly improved display format flexibility, operating reliability and display contrast in all ambient lighting conditions as well as significant short and long term cost of ownership advantages.

  10. Distributing flight dynamics products via the World Wide Web

    NASA Technical Reports Server (NTRS)

    Woodard, Mark; Matusow, David

    1996-01-01

    The NASA Flight Dynamics Products Center (FDPC), which make available selected operations products via the World Wide Web, is reported on. The FDPC can be accessed from any host machine connected to the Internet. It is a multi-mission service which provides Internet users with unrestricted access to the following standard products: antenna contact predictions; ground tracks; orbit ephemerides; mean and osculating orbital elements; earth sensor sun and moon interference predictions; space flight tracking data network summaries; and Shuttle transport system predictions. Several scientific data bases are available through the service.

  11. 14 CFR Special Federal Aviation... - Mitsubishi MU-2B Series Special Training, Experience, and Operating Requirements

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...

  12. 14 CFR Special Federal Aviation... - Mitsubishi MU-2B Series Special Training, Experience, and Operating Requirements

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...

  13. 14 CFR Special Federal Aviation... - Mitsubishi MU-2B Series Special Training, Experience, and Operating Requirements

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... maintenance test flight with a second pilot or certificated mechanic, and no passengers or cargo are carried... are distributed by Turbine Aircraft Services, Inc. You may obtain a copy from Turbine Aircraft.... Supplementary NTS E. In Flight Post Maintenance Checks 1. NTS In-Flight 2. Flight Idle Fuel Flow F. Limitations...

  14. Zero Gravity Flights as the Most Effective Embryonic Operation for Planned Commercial Spaceport

    NASA Astrophysics Data System (ADS)

    Abu Samah, Shamsul Kamar; Ridzuan Zakaria, Norul; Nasrun, Nasri; Abu, Jalaluddin; Muszaphar Shukor, Dato'Sheikh

    2013-09-01

    From the experience gained by the management team of Spaceport Malaysia, a popular service that can be provided by a planned commercial spaceport in a country without existing space travel infrastructure are zero gravity flights. Zero gravity flights range from parabolic flights using aerobatic airplane to suborbital flights using rockets, and in the near future using suborbital rocketplanes. Therefore, zero gravity flights can be operated from a certified runway or planned for operation at a future commercial spaceport. With such range of operation, zero gravity flights provide a natural link between a low cost operation of small airplane to exclusive high profile operation of suborbital rocketplane, and this attracts the attention of individuals and organizations that are planning for the establishment of a commercial spaceport. This is the approach chosen by the planners and developers of Spaceport Malaysia. A significant factor in zero gravity flight is the zero gravity time, the period where the payload onboard the airplane or rocketplane will experience zero gravity. Based on the momentum of the airplane or rocketplane, the zero gravity time may vary from few seconds to few minutes and that determines the quality of the zero gravity flight. To achieve zero gravity, the airplane or rocketplane will fly with a steady velocity for a significant time as a gravity control flight, accelerate upwards with an angle producing hypergravity and perform parabolic flight with natural momentum producing zero gravity and followed by dive that will result in another hypergravity flight. 2 zero gravity platforms being considered for operation at and by Spaceport Malaysia are F-5E Tiger II and Airbus A300, since both platforms have been successfully used by a partner of Spaceport Malaysia in performing zero gravity flights. An F-5E fighter jet owned by Royal Malaysian Air Force is being planned to be converted into a zero gravity platform to be operated at and by Spaceport Malaysia. Based on recorded zero gravity flights of the fighter jet, an F-5E will be able to produce 45 seconds of zero gravity time, long enough for effective zero gravity experiments. An A300 in operation in Europe is also being considered to be operated bySpaceport Malaysia. Even though this airplane can only produce less than half the zero gravity time produced by F-5E, the A300 has the advantage off passengers to experience zero gravity. Both zero gravity platforms have been promoting Spaceport Malaysia project and suborbital flights to be operational at the spaceport as both zero gravity flights and suborbital flights attract the interest from similar and preferred operators and markets. Therefore based on Spaceport Malaysia as a case study, zero gravity flights are the most effective embryonic operation for a planned commercial spaceport.

  15. Heart rate and performance during combat missions in a flight simulator.

    PubMed

    Lahtinen, Taija M M; Koskelo, Jukka P; Laitinen, Tomi; Leino, Tuomo K

    2007-04-01

    The psychological workload of flying has been shown to increase heart rate (HR) during flight simulator operation. The association between HR changes and flight performance remains unclear. There were 15 pilots who performed a combat flight mission in a Weapons Tactics Trainer simulator of an F-18 Hornet. An electrocardiogram (ECG) was recorded, and individual incremental heart rates (deltaHR) from the HR during rest were calculated for each flight phase and used in statistical analyses. The combat flight period was divided into 13 phases, which were evaluated on a scale of 1 to 5 by the flight instructor. HR increased during interceptions (from a mean resting level of 79.0 to mean value of 96.7 bpm in one of the interception flight phases) and decreased during the return to base and slightly increased during the ILS approach and landing. DeltaHR appeared to be similar among experienced and less experienced pilots. DeltaHR responses during the flight phases did not correlate with simulator flight performance scores. Overall simulator flight performance correlated statistically significantly (r = 0.50) with the F-18 Hornet flight experience. HR reflected the amount of cognitive load during the simulated flight. Hence, HR analysis can be used in the evaluation of the psychological workload of military simulator flight phases. However, more detailed flight performance evaluation methods are needed for this kind of complex flight simulation to replace the traditional but rough interval scales. Use of a visual analog scale by the flight instructors is suggested for simulator flight performance evaluation.

  16. KSC-08pd1948

    NASA Image and Video Library

    2008-07-11

    CAPE CANAVERAL, Fla. – The thermal vacuum fixture arrives at NASA's Kennedy Space Center. The fixture will be used to hold the carrier and flight support system for the STS-125 Hubble Space Telescope Servicing Mission 4. Space shuttle Atlantis is targeted to launch on the STS-125 mission Oct. 8. The mission crew will perform history-making, on-orbit “surgery” on two important science instruments aboard the telescope. After capturing the telescope, two teams of spacewalking astronauts will perform the repairs during five planned spacewalks. Photo credit: NASA/Jack Pfaller

  17. Forecast of space shuttle flight requirements for launch of commercial communications satellites

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The number of communication satellites required over the next 25 years to support domestic and regional communication systems for telephony, telegraphy and other low speed data; video teleconferencing, new data services, direct TV broadcasting; INTELSAT; and maritime and aeronautical services was estimated to determine the number of space shuttle flights necessary for orbital launching.

  18. Manpower Requirements for Air Traffic Control and Flight Service Specialists in Indiana.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Office of Manpower Studies.

    As of January 1, 1968 the Federal Aviation Administration (FAA) of the United States Department of Transportation employed 6,963 controllers in airport towers, 7,617 controllers in Air Route Traffic Control Centers, and 4,459 flight service specialists at airport locations. Projected needs are as follows: (1) Controllers in airport towers:…

  19. GSFC contamination monitors for Space Station

    NASA Technical Reports Server (NTRS)

    Carosso, P. A.; Tveekrem, J. L.; Coopersmith, J. D.

    1988-01-01

    This paper describes the Work Package 3 activities in the area of neutral contamination monitoring for the Space Station. Goddard Space Flight Center's responsibilities include the development of the Attached Payload Accommodations Equipment (APAE), the Polar Orbiting Platform (POP), and the Flight Telerobotic Servicer (FTS). GSFC will also develop the Customer Servicing Facility (CSF) in Phase 2 of the Space Station.

  20. 78 FR 64394 - Airworthiness Directives; Lycoming Engines and Continental Motors, Inc. Reciprocating Engines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... approve AMOCs for this AD. Use the procedures found in 14 CFR 39.19 to make your request. (2) AMOCs... turbochargers from service before further flight. This AD also requires removing certain HET turbochargers from service before further flight. This AD was prompted by a report that an additional engine, the CMI LTSIO...

  1. Compilation and development of K-6 aerospace materials for implementation in NASA spacelink electronic information system

    NASA Technical Reports Server (NTRS)

    Blake, Jean A.

    1987-01-01

    Spacelink is an electronic information service to be operated by the Marshall Space Flight Center. It will provide NASA news and educational resources including software programs that can be accessed by anyone with a computer and modem. Spacelink is currently being installed and will soon begin service. It will provide daily updates of NASA programs, information about NASA educational services, manned space flight, unmanned space flight, aeronautics, NASA itself, lesson plans and activities, and space program spinoffs. Lesson plans and activities were extracted from existing NASA publications on aerospace activities for the elementary school. These materials were arranged into 206 documents which have been entered into the Spacelink program for use in grades K-6.

  2. Crew Training - Apollo 9 - Grumman Aircraft Eng. Corp. (GAEC)

    NASA Image and Video Library

    1969-01-25

    S69-17615 (25 Jan. 1969) --- Astronaut Russell L. Schweickart, lunar module pilot of the Apollo 9 prime crew, participates in a press conference at the Grumman Aircraft Engineering Corporation. Grumman is the contractor to NASA for the Lunar Module. Schweickart is holding a model of a docked Lunar Module/Command and Service Modules. The Apollo 9 mission will evaluate spacecraft lunar module systems performance during manned Earth-orbital flight.

  3. Kaleri works with the Pilot experiment during Expedition 8

    NASA Image and Video Library

    2003-10-31

    ISS008-E-05179 (31 October 2003) --- Cosmonaut Alexander Y. Kaleri, Expedition 8 flight engineer, works with the Russian biomedical “Pilot” experiment (MBI-15) in the Zvezda Service Module on the International Space Station (ISS). The experiment, which looks at psychological and physiological changes in crew performance during long-duration spaceflight, requires a worktable, ankle restraint system and two control handles for testing piloting skill. Kaleri represents Rosaviakosmos.

  4. Low-speed airspeed calibration data for a single-engine research-support aircraft

    NASA Technical Reports Server (NTRS)

    Holmes, B. J.

    1980-01-01

    A standard service airspeed system on a single engine research support airplane was calibrated by the trailing anemometer method. The effects of flaps, power, sideslip, and lag were evaluated. The factory supplied airspeed calibrations were not sufficiently accurate for high accuracy flight research applications. The trailing anemometer airspeed calibration was conducted to provide the capability to use the research support airplane to perform pace aircraft airspeed calibrations.

  5. Program for establishing long time flight service performance of composite materials in the central wing structure of C-130 aircraft. Phase 2: Detailed design

    NASA Technical Reports Server (NTRS)

    Harvill, W. E.; Duhig, J. J.; Spencer, B. R.

    1973-01-01

    The design, fabrication, and evaluation of boron-epoxy reinforced C-130 center wing boxes are discussed. Design drawings, static strength, fatigue endurance, flutter, and weight analyses required for the wing box fabrication are presented. Additional component testing to verify the design for panel buckling and to evaluate specific local design areas are reported.

  6. Real-time synthetic vision cockpit display for general aviation

    NASA Astrophysics Data System (ADS)

    Hansen, Andrew J.; Smith, W. Garth; Rybacki, Richard M.

    1999-07-01

    Low cost, high performance graphics solutions based on PC hardware platforms are now capable of rendering synthetic vision of a pilot's out-the-window view during all phases of flight. When coupled to a GPS navigation payload the virtual image can be fully correlated to the physical world. In particular, differential GPS services such as the Wide Area Augmentation System WAAS will provide all aviation users with highly accurate 3D navigation. As well, short baseline GPS attitude systems are becoming a viable and inexpensive solution. A glass cockpit display rendering geographically specific imagery draped terrain in real-time can be coupled with high accuracy (7m 95% positioning, sub degree pointing), high integrity (99.99999% position error bound) differential GPS navigation/attitude solutions to provide both situational awareness and 3D guidance to (auto) pilots throughout en route, terminal area, and precision approach phases of flight. This paper describes the technical issues addressed when coupling GPS and glass cockpit displays including the navigation/display interface, real-time 60 Hz rendering of terrain with multiple levels of detail under demand paging, and construction of verified terrain databases draped with geographically specific satellite imagery. Further, on-board recordings of the navigation solution and the cockpit display provide a replay facility for post-flight simulation based on live landings as well as synchronized multiple display channels with different views from the same flight. PC-based solutions which integrate GPS navigation and attitude determination with 3D visualization provide the aviation community, and general aviation in particular, with low cost high performance guidance and situational awareness in all phases of flight.

  7. The key to successful management of STS operations: An integrated production planning system

    NASA Technical Reports Server (NTRS)

    Johnson, W. A.; Thomasen, C. T.

    1985-01-01

    Space Transportation System operations managers are being confronted with a unique set of challenges as a result of increasing flight rates, the demand for flight manifest/production schedule flexibility and an emphasis on continued cost reduction. These challenges have created the need for an integrated production planning system that provides managers with the capability to plan, schedule, status and account for an orderly flow of products and services across a large, multi-discipline organization. With increased visibility into the end-to-end production flow for individual and parallel missions in process, managers can assess the integrated impact of changes, identify and measure the interrelationships of resource, schedule, and technical performance requirements and prioritize productivity enhancements.

  8. CCSDS Mission Operations Action Service Core Capabilities

    NASA Technical Reports Server (NTRS)

    Reynolds, Walter F.; Lucord, Steven A.; Stevens, John E.

    2009-01-01

    This slide presentation reviews the operations concepts of the command (action) services. Since the consequences of sending the wrong command are unacceptable, the command system provides a collaborative and distributed work environment for flight controllers and operators. The system prescribes a review and approval process where each command is viewed by other individuals before being sent to the vehicle. The action service needs additional capabilities to support he operations concepts of manned space flight. These are : (1) Action Service methods (2) Action attributes (3) Action parameter/argument attributes (4 ) Support for dynamically maintained action data. (5) Publish subscri be capabilities.

  9. Flight Attendant Fatigue Recommendation 2: Flight Attendant Work/Rest Patterns, Alertness, and Performance Assessment

    DTIC Science & Technology

    2010-12-01

    Recommendation II: Flight Attendant Work/Rest Patterns, Alertness, and Performance Assessment DOT/FAA/AM-10/22 Office of Aerospace Medicine Washington, DC...Recipient’s Catalog No. DOT/FAA/AM-10/22 4. Title and Subtitle 5. Report Date December 2010 6. Performing Organization Code Flight...Attendant Fatigue Recommendation II: Flight Attendant Work/Rest Patterns, Alertness, and Performance Assessment 7. Author(s) 8. Performing

  10. Songbird - AN Innovative Uas Combining the Advantages of Fixed Wing and Multi Rotor Uas

    NASA Astrophysics Data System (ADS)

    Thamm, F.-P.; Brieger, N.; Neitzke, K.-P.; Meyer, M.; Jansen, R.; Mönninghof, M.

    2015-08-01

    This paper describes a family of innovative fixed wing UAS with can vertical take off and land - the SONGBIRD family. With nominal payloads starting from 0.5 kg they can take off and land safely like a multi-rotor UAV, removing the need for an airstrip for the critical phases of operation. A specially designed flight controller allows stable flight at every point of the transition phase between VTOL and fixed wing mode. Because of this smooth process with a all time stable flight, very expensive payload like hyperspectral sensors or advanced optical cameras can be used. Due to their design all airplanes of the SONGBIRD family have excellent horizontal flight properties, a maximum speed of over 110 km/h, good gliding properties and long flight times of up to 1 h. Missions were flown in wind speeds up to 18 m/s. At every time of the flight it is possible to interrupt the mission and hover over a point of interest for detail investigations. The complete flight, including take-off and landing can be performed by autopilot. Designed for daily use in professional environments, SONGBIRDs are built out of glass-fibre and carbon composites for a long service life. For safe operations comprehensive security features are implemented, for example redundant flight controllers and sensors, advanced power management system and mature fail safe procedures. The aircraft can be dismantled into small parts for transportation. SONGBIRDS are available for different pay loads, from 500 g to 2 kg. The SONGBIRD family are interesting tools combining the advantages of multi-copter and fixed wing UAS.

  11. Combining control input with flight path data to evaluate pilot performance in transport aircraft.

    PubMed

    Ebbatson, Matt; Harris, Don; Huddlestone, John; Sears, Rodney

    2008-11-01

    When deriving an objective assessment of piloting performance from flight data records, it is common to employ metrics which purely evaluate errors in flight path parameters. The adequacy of pilot performance is evaluated from the flight path of the aircraft. However, in large jet transport aircraft these measures may be insensitive and require supplementing with frequency-based measures of control input parameters. Flight path and control input data were collected from pilots undertaking a jet transport aircraft conversion course during a series of symmetric and asymmetric approaches in a flight simulator. The flight path data were analyzed for deviations around the optimum flight path while flying an instrument landing approach. Manipulation of the flight controls was subject to analysis using a series of power spectral density measures. The flight path metrics showed no significant differences in performance between the symmetric and asymmetric approaches. However, control input frequency domain measures revealed that the pilots employed highly different control strategies in the pitch and yaw axes. The results demonstrate that to evaluate pilot performance fully in large aircraft, it is necessary to employ performance metrics targeted at both the outer control loop (flight path) and the inner control loop (flight control) parameters in parallel, evaluating both the product and process of a pilot's performance.

  12. Haignere works in the Service Module during Expedition Three

    NASA Image and Video Library

    2001-10-23

    ISS003-E-6855 (23-31 October 2001) --- French Flight Engineer Claudie Haignere, works in the Zvezda Service Module on the International Space Station (ISS). Haignere represents ESA, carrying out a flight program for CNES, the French Space Agency, under a commercial contract with the Russian Aviation and Space Agency. This image was taken with a digital still camera.

  13. Intraindividual variability in basic reaction time predicts middle-aged and older pilots' flight simulator performance.

    PubMed

    Kennedy, Quinn; Taylor, Joy; Heraldez, Daniel; Noda, Art; Lazzeroni, Laura C; Yesavage, Jerome

    2013-07-01

    Intraindividual variability (IIV) is negatively associated with cognitive test performance and is positively associated with age and some neurological disorders. We aimed to extend these findings to a real-world task, flight simulator performance. We hypothesized that IIV predicts poorer initial flight performance and increased rate of decline in performance among middle-aged and older pilots. Two-hundred and thirty-six pilots (40-69 years) completed annual assessments comprising a cognitive battery and two 75-min simulated flights in a flight simulator. Basic and complex IIV composite variables were created from measures of basic reaction time and shifting and divided attention tasks. Flight simulator performance was characterized by an overall summary score and scores on communication, emergencies, approach, and traffic avoidance components. Although basic IIV did not predict rate of decline in flight performance, it had a negative association with initial performance for most flight measures. After taking into account processing speed, basic IIV explained an additional 8%-12% of the negative age effect on initial flight performance. IIV plays an important role in real-world tasks and is another aspect of cognition that underlies age-related differences in cognitive performance.

  14. Intraindividual Variability in Basic Reaction Time Predicts Middle-Aged and Older Pilots’ Flight Simulator Performance

    PubMed Central

    2013-01-01

    Objectives. Intraindividual variability (IIV) is negatively associated with cognitive test performance and is positively associated with age and some neurological disorders. We aimed to extend these findings to a real-world task, flight simulator performance. We hypothesized that IIV predicts poorer initial flight performance and increased rate of decline in performance among middle-aged and older pilots. Method. Two-hundred and thirty-six pilots (40–69 years) completed annual assessments comprising a cognitive battery and two 75-min simulated flights in a flight simulator. Basic and complex IIV composite variables were created from measures of basic reaction time and shifting and divided attention tasks. Flight simulator performance was characterized by an overall summary score and scores on communication, emergencies, approach, and traffic avoidance components. Results. Although basic IIV did not predict rate of decline in flight performance, it had a negative association with initial performance for most flight measures. After taking into account processing speed, basic IIV explained an additional 8%–12% of the negative age effect on initial flight performance. Discussion. IIV plays an important role in real-world tasks and is another aspect of cognition that underlies age-related differences in cognitive performance. PMID:23052365

  15. Design concept definition study for an improved shuttle waste collection subsystem

    NASA Technical Reports Server (NTRS)

    1984-01-01

    A no-risk approach for developing an Improved Waste Collection Subsystem (WCS) for the shuttle orbiter is described. The GE Improved WCS Concept builds on the experience of 14 Shuttle missions with over 400 man-days of service. This concept employs the methods of the existing flight-proven mature design, augmenting them to eliminate foreseen difficulties and to fully comply with the design requirements. The GE Improved WCS Concept includes separate storage for used wipes. Compaction of the wipes provides a solution to the capacity problem, fully satisfying the 210 man-day storage requirement. The added feature of in-flight serviceable storage space for the wipes creates a variable capacity feature which affords redundancy in the event of wipes compaction system failure. Addition of features permitting in-flight servicing of the feces storage tank creates a variable capacity WCS with easier post-flight servicing to support rapid turnaround of the Shuttle orbiter. When these features are combined with a vacuum pump to evacuate wipes and fecal storage tanks through replaceable odor/bacteria filters to the cabin, the GE Improved WCS satisfies the known requirements for Space Station use, including no venting to space.

  16. 14 CFR 1214.205 - Revisit and/or retrieval services.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...

  17. 14 CFR 1214.205 - Revisit and/or retrieval services.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...

  18. 14 CFR 1214.205 - Revisit and/or retrieval services.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a scheduled Shuttle flight, he will only pay for added mission planning, unique hardware or software... Section 1214.205 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION SPACE FLIGHT... priced on the basis of estimated costs. If a special dedicated Shuttle flight is required, the full...

  19. Space Station crew workload - Station operations and customer accommodations

    NASA Technical Reports Server (NTRS)

    Shinkle, G. L.

    1985-01-01

    The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

  20. Damage Tolerance Assessment Branch

    NASA Technical Reports Server (NTRS)

    Walker, James L.

    2013-01-01

    The Damage Tolerance Assessment Branch evaluates the ability of a structure to perform reliably throughout its service life in the presence of a defect, crack, or other form of damage. Such assessment is fundamental to the use of structural materials and requires an integral blend of materials engineering, fracture testing and analysis, and nondestructive evaluation. The vision of the Branch is to increase the safety of manned space flight by improving the fracture control and the associated nondestructive evaluation processes through development and application of standards, guidelines, advanced test and analytical methods. The Branch also strives to assist and solve non-aerospace related NDE and damage tolerance problems, providing consultation, prototyping and inspection services.

  1. One of NASA's Two Modified Boeing 747 Shuttle Carrier (SCA) Aircraft in Flight over NASA Dryden Flig

    NASA Technical Reports Server (NTRS)

    1999-01-01

    One of NASA's Boeing 747 Shuttle Carrier Aircraft flies over the Dryden Flight Research Center main building at Edwards Air Force Base, Edwards, California, in May 1999. NASA uses two modified Boeing 747 jetliners, originally manufactured for commercial use, as Space Shuttle Carrier Aircraft (SCA). One is a 747-100 model, while the other is designated a 747-100SR (short range). The two aircraft are identical in appearance and in their performance as Shuttle Carrier Aircraft. The 747 series of aircraft are four-engine intercontinental-range swept-wing 'jumbo jets' that entered commercial service in 1969. The SCAs are used to ferry space shuttle orbiters from landing sites back to the launch complex at the Kennedy Space Center, and also to and from other locations too distant for the orbiters to be delivered by ground transportation. The orbiters are placed atop the SCAs by Mate-Demate Devices, large gantry-like structures which hoist the orbiters off the ground for post-flight servicing, and then mate them with the SCAs for ferry flights. Features which distinguish the two SCAs from standard 747 jetliners are: o Three struts, with associated interior structural strengthening, protruding from the top of the fuselage (two aft, one forward) on which the orbiter is attached o Two additional vertical stabilizers, one on each end of the standard horizontal stabilizer, to enhance directional stability o Removal of all interior furnishings and equipment aft of the forward No. 1 doors o Instrumentation used by SCA flight crews and engineers to monitor orbiter electrical loads during the ferry flights and also during pre- and post-ferry flight operations. The two SCAs are under the operational control of NASA's Johnson Space Center, Houston, Tex. NASA 905 NASA 905 was the first SCA. It was obtained from American Airlines in 1974. Shortly after it was accepted by NASA it was flown in a series of wake vortex research flights at the Dryden Flight Research Center in a study to seek ways of reducing turbulence produced by large aircraft. Pilots flying as much as several miles behind large aircraft have encountered wake turbulence that have caused control problems. The NASA study helped the Federal Aviation Administration modify flight procedures for commercial aircraft during airport approaches and departures. Following the wake vortex studies, NASA 905 was modified by Boeing to its present SCA configuration and the aircraft was returned to Dryden for its role in the 1977 Space Shuttle Approach and Landing Tests (ALT). This series of eight captive and five free flights with the orbiter prototype Enterprise, in addition to ground taxi tests, validated the aircraft's performance as an SCA, in addition to verifying the glide and landing characteristics of the orbiter configuration -- paving the way for orbital flights. A flight crew escape system, consisting of an exit tunnel extending from the flight deck to a hatch in the bottom of the fuselage, was installed during the modifications. The system also included a pyrotechnic system to activate the hatch release and cabin window release mechanisms. The flight crew escape system was removed from the NASA 905 following the successful completion of the ALT program. NASA 905 was the only SCA used by the space shuttle program until November 1990, when NASA 911 was delivered as an SCA. Along with ferrying Enterprise and the flight-rated orbiters between the launch and landing sites and other locations, NASA 905 also ferried Enterprise to Europe for display in England and at the Paris Air Show. NASA 911 The second SCA is designated NASA 911. It was obtained by NASA from Japan Airlines (JAL) in 1989. It was also modified by Boeing Corporation. It was delivered to NASA 20 November 1990.

  2. NASA Dryden's UAS Service Capabilities

    NASA Technical Reports Server (NTRS)

    Bauer, Jeff

    2007-01-01

    The vision of NASA s Dryden Flight Research Center is to "fly what others only imagine." Its mission is to advance technology and science through flight. Objectives supporting the mission include performing flight research and technology integration to revolutionize aviation and pioneer aerospace technology, validating space exploration concepts, conducting airborne remote sensing and science missions, and supporting operations of the Space Shuttle and the International Space Station. A significant focus of effort in recent years has been on Unmanned Aircraft Systems (UAS), both in support of the Airborne Science Program and as research vehicles to advance the state of the art in UAS. Additionally, the Center has used its piloted aircraft in support of UAS technology development. In order to facilitate greater access to the UAS expertise that exists at the Center, that expertise has been organized around three major capabilities. The first is access to high-altitude, long-endurance UAS. The second is the establishment of a test range for small UAS. The third is safety case assessment support.

  3. SNC's Dream Chaser Arrives at NASA Armstrong

    NASA Image and Video Library

    2017-03-08

    This 58-second video shows Sierra Nevada Corporation (SNC) delivering its Dream Chaser spacecraft on Jan. 25, 2017, to NASA's Armstrong Flight Research Center in California, located on Edwards Air Force Base. The spacecraft will undergo several months of testing at the Center in preparation for its approach and landing flight on the base's runway. The test series is part of a developmental space act agreement SNC has with NASA’s HYPERLINK Commercial Crew Program. The upcoming test campaign will help SNC validate the aerodynamic properties, flight software and control system performance of the Dream Chaser. The Dream Chaser is also being prepared to deliver cargo to the International Space Station under NASA’s Commercial Resupply Services 2 (CRS2) contract beginning in 2019. The data that SNC gathers from this test campaign will help influence and inform the final design of the cargo Dream Chaser, which will fly at least six cargo delivery missions to and from the Space Station by 2024.

  4. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents computational results of these large-scale instances. To validate the models and solution algorithms developed, this thesis also compares the daily flight schedules that it designs with the schedules of the existing airlines. Furthermore, it creates instances that represent different economic and fuel-prices conditions and derives schedules under these different conditions. In addition, it discusses the implication of using new aircraft in the future flight schedules. Finally, future research in three areas---model, computational method, and simulation for validation---is proposed.

  5. 14 CFR § 1214.108 - Termination.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Provisions Regarding Space Shuttle Flights of Payloads for Non-U.S. Government, Reimbursable Customers § 1214... standard services to NASA. (1) The termination fee for dedicated flights will be computed as a percentage of the Shuttle standard flight price and will be based on the table below. Months before scheduled...

  6. Fast aurora zone analysis

    NASA Technical Reports Server (NTRS)

    Booker, Mattie

    1992-01-01

    The Flight Dynamics Facility (FDF) of the Flight Dynamics Division (FDD), of the Goddard Space Flight Center provides acquisition data to tracking stations and orbit and attitude services to scientists and mission support personnel. The following paper explains how a method was determined that found spacecraft entry and exit times of the aurora zone.

  7. 14 CFR 10 - Functional Classification-Operating Expenses of Group I Air Carriers

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... shall include expenses incurred directly in the in-flight operation of aircraft and expenses attaching...-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing... aircraft or aircraft operational personnel for flight assignment. Such expenses shall be included in...

  8. Flight Instructor: Airplane. Written Test Guide.

    ERIC Educational Resources Information Center

    Federal Aviation Administration (DOT), Washington, DC. Flight Standards Service.

    The Flight Standards Service of the Federal Aviation Administration developed the guide to assist applicants who are preparing for the Flight Instructor Certificate with Airplane Rating. The guide contains comprehensive study outlines and a list of recommended study materials and tells how to obtain those publications. It also includes sample test…

  9. 75 FR 79437 - Notification of Proposed Delegation Programs and Request for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-20

    ... programs. Knowledge Testing ODAs would be appointed and managed by The Flight Standards Airman Testing... CFR part 133. Air Operator ODAs would be appointed and managed by the geographic Flight Standards District Office under the authority of the Director, Flight Standards Service. The FAA anticipates granting...

  10. APMS 3.0 Flight Analyst Guide: Aviation Performance Measuring System

    NASA Technical Reports Server (NTRS)

    Jay, Griff; Prothero, Gary; Romanowski, Timothy; Lynch, Robert; Lawrence, Robert; Rosenthal, Loren

    2004-01-01

    The Aviation Performance Measuring System (APMS) is a method-embodied in software-that uses mathematical algorithms and related procedures to analyze digital flight data extracted from aircraft flight data recorders. APMS consists of an integrated set of tools used to perform two primary functions: a) Flight Data Importation b) Flight Data Analysis.

  11. STRS Radio Service Software for NASA's SCaN Testbed

    NASA Technical Reports Server (NTRS)

    Mortensen, Dale J.; Bishop, Daniel Wayne; Chelmins, David T.

    2012-01-01

    NASAs Space Communication and Navigation(SCaN) Testbed was launched to the International Space Station in 2012. The objective is to promote new software defined radio technologies and associated software application reuse, enabled by this first flight of NASAs Space Telecommunications Radio System(STRS) architecture standard. Pre-launch testing with the testbeds software defined radios was performed as part of system integration. Radio services for the JPL SDR were developed during system integration to allow the waveform application to operate properly in the space environment, especially considering thermal effects. These services include receiver gain control, frequency offset, IQ modulator balance, and transmit level control. Development, integration, and environmental testing of the radio services will be described. The added software allows the waveform application to operate properly in the space environment, and can be reused by future experimenters testing different waveform applications. Integrating such services with the platform provided STRS operating environment will attract more users, and these services are candidates for interface standardization via STRS.

  12. STRS Radio Service Software for NASA's SCaN Testbed

    NASA Technical Reports Server (NTRS)

    Mortensen, Dale J.; Bishop, Daniel Wayne; Chelmins, David T.

    2013-01-01

    NASA's Space Communication and Navigation(SCaN) Testbed was launched to the International Space Station in 2012. The objective is to promote new software defined radio technologies and associated software application reuse, enabled by this first flight of NASA's Space Telecommunications Radio System (STRS) architecture standard. Pre-launch testing with the testbed's software defined radios was performed as part of system integration. Radio services for the JPL SDR were developed during system integration to allow the waveform application to operate properly in the space environment, especially considering thermal effects. These services include receiver gain control, frequency offset, IQ modulator balance, and transmit level control. Development, integration, and environmental testing of the radio services will be described. The added software allows the waveform application to operate properly in the space environment, and can be reused by future experimenters testing different waveform applications. Integrating such services with the platform provided STRS operating environment will attract more users, and these services are candidates for interface standardization via STRS.

  13. Concorde Re-visited

    NASA Astrophysics Data System (ADS)

    Horton, Peter; Moore, Peter

    This year marks the twentieth anniversary of the introduction of Concorde into commercial airline service. The first commercial flights were on 21 January 1976 - British Airways from Heathrow to Bahrain and Air France from Paris to Rio via Dakar. Later in that year commercial flights to Washington/Dulles began on 24 May. Services to New York were delayed until 22 November 1977. The first flight of Concorde was some seven years earlier. The prototype took off out of Toulouse on 2 March 1969 and this was followed by 002 from Filton to Fairford on 9 April. At the time it was anticipated that this was the beginning of an era when supersonic flight would be the normal way to travel long distances. Now, in 1996, Concorde is still the world's only supersonic commercial passenger airliner in airline service. This is an extraordinary achievement. The Boeing SST proved to be too ambitious and the programme was halted in 1971 after the United States Government withdrew support, while the Russian TU 144 was beset with problems. One TU 144 crashed at the Paris Air Show in 1973. The aircraft entered internal airline service in December 1975, flying supersonically between Moscow and Alma-Ata, capital of Kazakhstan, carrying mail and freight, but it did not have the range to operate viable intercontinental passenger serives. Certainly by 1985, if not many years before, the TU 144 was out of service.

  14. Testing of FTS fingers and interface using a passive compliant robot manipulator. [flight telerobot servicer

    NASA Technical Reports Server (NTRS)

    Nguyen, Charles C.; Antrazi, Sami S.

    1992-01-01

    This report deals with testing of a pair of robot fingers designed for the Flight Telerobotic Servicer (FTS) to grasp a cylinder type of Orbital Replaceable Unit (ORU) interface. The report first describes the objectives of the study and then the testbed consisting of a Stewart Platform-based manipulator equipped with a passive compliant platform which also serves as a force/torque sensor. Kinematic analysis is then performed to provide a closed-form solution for the force inverse kinematics and iterative solution for the force forward kinematics using the Newton's Raphson Method. Mathematical expressions are then derived to compute force/torques applied to the FTS fingers during the mating/demating with the interface. The report then presents the three parts of the experimental study on the feasibility and characteristics of the fingers. The first part obtains data of forces applied by the fingers to the interface under various misalignments, the second part determines the maximum allowable capture angles for mating, and the third part processes and interprets the obtained force/torque data.

  15. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-08

    After five days of service and upgrade work on the Hubble Space Telescope (HST), the STS-109 crew photographed the giant telescope in the shuttle's cargo bay. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  16. n/a

    NASA Image and Video Library

    2002-03-09

    After five days of service and upgrade work on the Hubble Space Telescope (HST), the STS-109 crew photographed the giant telescope returning to its normal routine. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where 4 of the 7-member crew performed 5 space walks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near- Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. Launched March 1, 2002, the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  17. Flight Dynamics Operations Management of the Large and Heterogeneous Eutelsat Fleet of Commercial Satellites

    NASA Astrophysics Data System (ADS)

    Bellido, E.

    The EUTELSAT FDU (Flight Dynamics Unit) manages the resources to perform the typical activities of the large satellite operators and faces the usual difficulties raising from a vast and heterogeneous fleet. At present 20 satellites from 9 different platforms/sub-platforms are controlled from our Satellite Control Centre. The FDU was created in 2002 with the aim to respond to the operational needs of a growing fleet in terms of number of satellites and activities. It is at present composed of 6 engineering staff with the objective to provide operations service covering the whole lifecycle of the satellites from the procurement phase till the decommissioning. The most demanding activity is the daily operations, which must ensure maximum safety and continuity of service with the highest efficiency. Solutions have been applied from different areas: management, structure, operations organisation, processes, facilities, quality standards, etc. In addition to this, EUTELSAT is a growing communications operator and the FDU needs to contribute to the global objectives of the company. This paper covers our approach.

  18. Flight service evaluation of composite helicopter components

    NASA Technical Reports Server (NTRS)

    Mardoian, George H.; Ezzo, Maureen B.

    1990-01-01

    An assessment is presented of ten composite tail rotor spars and four horizontal stabilizers exposed to the effects of in-flight commercial service for up to nine years to establish realistic environmental factors for use in future designs. This evaluation is supported by test results of helicopter components and panels which have been exposed to outdoor environmental effects since 1979. Full scale static and fatigue tests were conducted on graphite/epoxy and Kevlar/epoxy composite components removed from Sikorsky Model S-76 helicopters in commercial operations off the Gulf Coast of Louisiana. Small scale static and fatigue tests were conducted on coupons obtained from panels exposed to outdoor conditions in Stratford, CT and West Palm Beach, Florida. The panel materials and ply configurations were representative of the S-76 components. The results are discussed of moisture analyses and strength tests on both the S-76 components and composite panels after up to nine years of outdoor exposure. Full scale tests performed on the helicopter components did not disclose any significant reductions from the baseline strengths. The results increased confidence in the long term durability of advanced composite materials in helicopter structural applications.

  19. Electromagnetic Interference to Flight Navigation and Communication Systems: New Strategies in the Age of Wireless

    NASA Technical Reports Server (NTRS)

    Ely, Jay J.

    2005-01-01

    Electromagnetic interference (EMI) promises to be an ever-evolving concern for flight electronic systems. This paper introduces EMI and identifies its impact upon civil aviation radio systems. New wireless services, like mobile phones, text messaging, email, web browsing, radio frequency identification (RFID), and mobile audio/video services are now being introduced into passenger airplanes. FCC and FAA rules governing the use of mobile phones and other portable electronic devices (PEDs) on board airplanes are presented along with a perspective of how these rules are now being rewritten to better facilitate in-flight wireless services. This paper provides a comprehensive overview of NASA cooperative research with the FAA, RTCA, airlines and universities to obtain laboratory radiated emission data for numerous PED types, aircraft radio frequency (RF) coupling measurements, estimated aircraft radio interference thresholds, and direct-effects EMI testing. These elements are combined together to provide high-confidence answers regarding the EMI potential of new wireless products being used on passenger airplanes. This paper presents a vision for harmonizing new wireless services with aeronautical radio services by detecting, assessing, controlling and mitigating the effects of EMI.

  20. Command and Service Module Communications

    NASA Technical Reports Server (NTRS)

    Interbartolo, Michael

    2009-01-01

    This viewgraph presentation examines Command and Service Module (CSM) Communications. The communication system's capabilities are defined, including CSM-Earth, CSM-Lunar Module and CSM-Extravehicular crewman communications. An overview is provided for S-band communications, including data transmission and receiving rates, operating frequencies and major system components (pre-modulation processors, unified S-band electronics, S-band power amplifier and S-band antennas). Additionally, data transmission rates, operating frequencies and the capabilities of VHF communications are described. Major VHF components, including transmitters and receivers, and the VHF multiplexer and antennas are also highlighted. Finally, communications during pre-launch, ascent, in-flight and entry are discussed. Overall, the CSM communication system was rated highly by flight controllers and crew. The system was mostly autonomous for both crew and flight controllers and no major issues were encountered during flight.

  1. A Modular, Data Driven System: Architecture for GSFC Ground Systems: GSFC's Mission Services Evolution Center (GMSEC)

    NASA Technical Reports Server (NTRS)

    Cary, Everett; Smith, Danford

    2004-01-01

    The GSFC Mission Services Evolution Center (GMSEC) was established in 2001 to coordinate ground and flight data systems development and services at NASA's Goddard Space Flight Center (GSFC). GMSEC system architecture represents a new way to build the next generation systems to be used for a variety of missions for years to come. The old approach was to find or build the best products available and integrate them into a reusable system to meet everyone's needs. The new approach assumes that needs, products, and technology will change.

  2. Satellite services system analysis study: Propellant transfer system

    NASA Technical Reports Server (NTRS)

    1982-01-01

    General servicing requirements, a servicing mission concept and scenario, overall servicing needs, basic servicing equipment, and a general servicing mission configuration layout are addressed. Servicing needs, equipment concepts, system requirements equipment specifications, preliminary designs, and resource requirements for flight hardware for the propellant transfer system are also addressed.

  3. Aircraft Anomaly Detection Using Performance Models Trained on Fleet Data

    NASA Technical Reports Server (NTRS)

    Gorinevsky, Dimitry; Matthews, Bryan L.; Martin, Rodney

    2012-01-01

    This paper describes an application of data mining technology called Distributed Fleet Monitoring (DFM) to Flight Operational Quality Assurance (FOQA) data collected from a fleet of commercial aircraft. DFM transforms the data into aircraft performance models, flight-to-flight trends, and individual flight anomalies by fitting a multi-level regression model to the data. The model represents aircraft flight performance and takes into account fixed effects: flight-to-flight and vehicle-to-vehicle variability. The regression parameters include aerodynamic coefficients and other aircraft performance parameters that are usually identified by aircraft manufacturers in flight tests. Using DFM, the multi-terabyte FOQA data set with half-million flights was processed in a few hours. The anomalies found include wrong values of competed variables, (e.g., aircraft weight), sensor failures and baises, failures, biases, and trends in flight actuators. These anomalies were missed by the existing airline monitoring of FOQA data exceedances.

  4. Equivalence Testing as a Tool for Fatigue Risk Management in Aviation.

    PubMed

    Wu, Lora J; Gander, Philippa H; van den Berg, Margo; Signal, T Leigh

    2018-04-01

    Many civilian aviation regulators favor evidence-based strategies that go beyond hours-of-service approaches for managing fatigue risk. Several countries now allow operations to be flown outside of flight and duty hour limitations, provided airlines demonstrate an alternative method of compliance that yields safety levels "at least equivalent to" the prescriptive regulations. Here we discuss equivalence testing in occupational fatigue risk management. We present suggested ratios/margins of practical equivalence when comparing operations inside and outside of prescriptive regulations for two common aviation safety performance indicators: total in-flight sleep duration and psychomotor vigilance task reaction speed. Suggested levels of practical equivalence, based on expertise coupled with evidence from field and laboratory studies, are ≤ 30 min in-flight sleep and ± 15% of reference response speed. Equivalence testing is illustrated in analyses of a within-subjects field study during an out-and-back long-range trip. During both sectors of their trip, 41 pilots were monitored via actigraphy, sleep diary, and top of descent psychomotor vigilance task. Pilots were assigned to take rest breaks in a standard lie-flat bunk on one sector and in a bunk tapered 9 from hip to foot on the other sector. Total in-flight sleep duration (134 ± 53 vs. 135 ± 55 min) and mean reaction speed at top of descent (3.94 ± 0.58 vs. 3.77 ± 0.58) were equivalent after rest in the full vs. tapered bunk. Equivalence testing is a complimentary statistical approach to difference testing when comparing levels of fatigue and performance in occupational settings and can be applied in transportation policy decision making.Wu LJ, Gander PH, van den Berg M, Signal TL. Equivalence testing as a tool for fatigue risk management in aviation. Aerosp Med Hum Perform. 2018; 89(4):383-388.

  5. Performance improvement of optical CDMA networks with stochastic artificial bee colony optimization technique

    NASA Astrophysics Data System (ADS)

    Panda, Satyasen

    2018-05-01

    This paper proposes a modified artificial bee colony optimization (ABC) algorithm based on levy flight swarm intelligence referred as artificial bee colony levy flight stochastic walk (ABC-LFSW) optimization for optical code division multiple access (OCDMA) network. The ABC-LFSW algorithm is used to solve asset assignment problem based on signal to noise ratio (SNR) optimization in OCDM networks with quality of service constraints. The proposed optimization using ABC-LFSW algorithm provides methods for minimizing various noises and interferences, regulating the transmitted power and optimizing the network design for improving the power efficiency of the optical code path (OCP) from source node to destination node. In this regard, an optical system model is proposed for improving the network performance with optimized input parameters. The detailed discussion and simulation results based on transmitted power allocation and power efficiency of OCPs are included. The experimental results prove the superiority of the proposed network in terms of power efficiency and spectral efficiency in comparison to networks without any power allocation approach.

  6. NASA ER-2 Doppler radar reflectivity calibration for the CAMEX project

    NASA Technical Reports Server (NTRS)

    Caylor, I. J.; Heymsfield, G. M.; Bidwell, S. W.; Ameen, S.

    1994-01-01

    The NASA ER-2 Doppler radar (EDOP) was flown aboard the ER-2 high-altitude aircraft in September and October 1993 for the Convection and Moisture Experiment. During these flights, the first reliable reflectivity observations were performed with the EDOP instrument. This report details the procedure used to convert real-time engineering data into calibrated radar reflectivity. Application of the calibration results produces good agreement between the EDOP nadir pointing reflectivity and ground truth provided by a National Weather Service WSR-88D radar. The rms deviation between WSR-88D and EDOP is 6.9 dB, while measurements of the ocean surface backscatter coefficient are less than 3 dB from reported scatterometer coefficients. After an initial 30-minute period required for the instrument to reach thermal equilibrium, the radar is stable to better than 0.25 dB during flight. The range performance of EDOP shows excellent agreement with aircraft altimeter and meteorological sounding data.

  7. Advanced Earth-to-orbit propulsion technology program overview: Impact of civil space technology initiative

    NASA Technical Reports Server (NTRS)

    Stephenson, Frank W., Jr.

    1988-01-01

    The NASA Earth-to-Orbit (ETO) Propulsion Technology Program is dedicated to advancing rocket engine technologies for the development of fully reusable engine systems that will enable space transportation systems to achieve low cost, routine access to space. The program addresses technology advancements in the areas of engine life extension/prediction, performance enhancements, reduced ground operations costs, and in-flight fault tolerant engine operations. The primary objective is to acquire increased knowledge and understanding of rocket engine chemical and physical processes in order to evolve more realistic analytical simulations of engine internal environments, to derive more accurate predictions of steady and unsteady loads, and using improved structural analyses, to more accurately predict component life and performance, and finally to identify and verify more durable advanced design concepts. In addition, efforts were focused on engine diagnostic needs and advances that would allow integrated health monitoring systems to be developed for enhanced maintainability, automated servicing, inspection, and checkout, and ultimately, in-flight fault tolerant engine operations.

  8. Space Cryogenics Workshop, University of Wisconsin, Madison, June 22, 23, 1987

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Papers are presented on liquid helium servicing from the Space Station, performance estimates in the Superfluid Helium On-Orbit Transfer Flight Experiment, an analytical study of He II flow characteristics in the SHOOT transfer line, a Dewar to Dewar model for superfluid helium transfer, and mechanical pumps for superfluid helium transfer in space. Attention is also given to the cavitation characteristics of a small centrifugal pump in He I and He II, turbulent flow pressure drop in various He II transfer system components, slip effects associated with Knudsen transport phenomena in porous media, and an integrated fountain effect pump device for fluid management at low gravity. Other papers are on liquid/vapor phase separation in He-4 using electric fields, an enclosed capillary device for low-gravity management of He II, cavitation in flowing superfluid helium, the long-term performance of the passive thermal control systems of the IRAS spacecraft, and a novel approach to supercritical helium flight cryostat support structures.

  9. Operations Research Flight Ground Service Education/Outreach

    NASA Technical Reports Server (NTRS)

    Smith, Scott M.

    2011-01-01

    This viewgraph presentation describes a nutritional biochemistry assessment of astronauts in preflight, in-flight, and post-flight operations. In-flight collections of blood and urine samples from astronauts to test the effects of Vitamin K, Pro K, Vitamin D, Omega-3 Fatty Acids, Iron, and Sodium in spaceflight is shown. A demonstration of a 1-carbon metabolism pathway that determines the existence of enzymes and polymorphisms is also presented.

  10. In-flight speech intelligibility evaluation of a service member with sensorineural hearing loss: case report.

    PubMed

    Casto, Kristen L; Cho, Timothy H

    2012-09-01

    This case report describes the in-flight speech intelligibility evaluation of an aircraft crewmember with pure tone audiometric thresholds that exceed the U.S. Army's flight standards. Results of in-flight speech intelligibility testing highlight the inability to predict functional auditory abilities from pure tone audiometry and underscore the importance of conducting validated functional hearing evaluations to determine aviation fitness-for-duty.

  11. Influence of trap design on upwind flight behavior and capture of female grape berry moth (Lepidoptera: Tortricidae) with a kairomone lure.

    PubMed

    Cha, Dong H; Hesler, Stephen P; Linn, Charles E; Zhang, Aijun; Teal, Peter E A; Knight, Alan L; Roelofs, Wendell L; Loeb, Gregory M

    2013-02-01

    Oil-coated clear panel traps baited with a host plant-based kairomone lure have successfully been used for monitoring female grape berry moth, Paralobesia viteana (Clemens) (Lepidoptera: Tortricidae), but low capture rates as well as difficulty in servicing these traps makes them unsuitable for commercial use. We compared the performance of different trap designs in a flight tunnel and in a vineyard by using a 7-component synthetic kairomone blend, with a focus on trap visual cues. In flight tunnel experiments, a clear delta trap performed better than other traps. When we tested clear delta, green delta, or clear wing traps baited with a cut grape shoot, >50% of female grape berry moths made complete upwind flights. However, the clear delta trap was the only design that resulted in female moths entering the trap. Similar results were observed when females were tested with different traps (clear delta, green delta, white delta, clear wing, or green wing traps) baited with the kairomone lure. Adding a visual pattern that mimicked grape shoots to the outside surface of the clear delta trap resulted in 66% of the females that made upwind flights entering the trap. However, the positive effect of adding a visual pattern to the trap was not observed in a vineyard setting, where clear delta traps with or without a visual pattern caught similar numbers of females. Still, the number of male and female grape berry moths captured in clear delta traps with or without a visual pattern was not significantly different from the number of male and female grape berry moths captured in panel traps, suggesting that the use of these delta traps could be a less cumbersome alternative to oil-coated panel traps for monitoring female grape berry moth.

  12. Technology demonstrator program for Space Station Environmental Control Life Support System

    NASA Technical Reports Server (NTRS)

    Adams, Alan M.; Platt, Gordon K.; Claunch, William C.; Humphries, William R.

    1987-01-01

    The main objectives and requirements of the NASA/Marshall Space Flight Center Technology Demonstration Program are discussed. The program consists of a comparative test and a 90-day manned system test to evaluate an Environmental Control and Life Support System (ECLSS). In the comparative test phase, 14 types of subsystems which perform oxygen and water reclamation functions are to be examined in terms of performance maintenance/service requirements, reliability, and safety. The manned chamber testing phase involves a four person crew using a partial ECLSS for 90 days. The schedule for the program and the program hardware requirements are described.

  13. Autonomous Relative Navigation for Formation-Flying Satellites Using GPS

    NASA Technical Reports Server (NTRS)

    Gramling, Cheryl; Carpenter, J. Russell; Long, Anne; Kelbel, David; Lee, Taesul

    2000-01-01

    The Goddard Space Flight Center is currently developing advanced spacecraft systems to provide autonomous navigation and control of formation flyers. This paper discusses autonomous relative navigation performance for a formation of four eccentric, medium-altitude Earth-orbiting satellites using Global Positioning System (GPS) Standard Positioning Service (SPS) and "GPS-like " intersatellite measurements. The performance of several candidate relative navigation approaches is evaluated. These analyses indicate that an autonomous relative navigation position accuracy of 1meter root-mean-square can be achieved by differencing high-accuracy filtered solutions if only measurements from common GPS space vehicles are used in the independently estimated solutions.

  14. A summary of the mechanical design, testing and performance of the IMP-H and J attitude control systems

    NASA Technical Reports Server (NTRS)

    Metzger, J. R.

    1974-01-01

    The main aspects of the attitude control system used on both the IMP-H and J spacecraft are presented. The mechanical configuration is described. Information on all the specific components comprising the flight system is provided. The acceptance and qualification testing of both individual components and the installed system are summarized. Functional information regarding the operation and performance in relation to the orbiting spacecraft and its mission is included. Related topics which are discussed are: (1) safety requirements, (2) servicing procedures, (3) anomalous behavior, and (4) pyrotechnic devices.

  15. KSC-08pd2077

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  16. KSC-08pd2081

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  17. KSC-08pd2075

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, workers from NASA's Goddard Space Flight Center begin to remove the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  18. KSC-08pd2082

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Super Lightweight Interchangeable Carrier for the Hubble Space Telescope. The Super Lightweight Interchangeable Carrier, or SLIC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Orbital Replacement Unit Carrier, or ORUC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  19. KSC-08pd2074

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is secured on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  20. KSC-08pd2076

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center cuts away the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  1. KSC-08pd2070

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is lifted from its transportation canister by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  2. KSC-08pd2073

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, the Orbital Replacement Unit Carrier for the Hubble Space Telescope is positioned on a work platform by workers from NASA's Goddard Space Flight Center. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  3. KSC-08pd2080

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  4. KSC-08pd2078

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  5. KSC-08pd2079

    NASA Image and Video Library

    2008-07-18

    CAPE CANAVERAL, Fla. – In the high bay of the Payload Hazardous Servicing Facility at NASA's Kennedy Space Center, a worker from NASA's Goddard Space Flight Center removes the protective wrapping from the Orbital Replacement Unit Carrier for the Hubble Space Telescope. The Orbital Replacement Unit Carrier, or ORUC, is one of four carriers supporting hardware for space shuttle Atlantis' STS-125 mission to service the telescope. The Super Lightweight Interchangeable Carrier, or SLIC, and the Flight Support System, or FSS, have also arrived at Kennedy. The Multi-Use Lightweight Equipment carrier will be delivered in late July. The carriers will be prepared for the integration of telescope science instruments, both internal and external replacement components, as well as the flight support equipment to be used by the astronauts during the Hubble servicing mission, targeted for launch Oct. 8. Photo credit: NASA/Jack Pfaller

  6. Population and habitat viability assessments for Golden-cheeked Warblers and Black-capped Vireos: Usefulness to Partners in Flight Conservation Planning

    USGS Publications Warehouse

    Beardmore, C.J.; Hatfield, J.S.; Bonney, Rick; Pashley, David N.; Cooper, Robert; Niles, Larry

    2000-01-01

    Golden-cheeked Warblers and Black-capped Vireos are Neotropical migratory birds that are federally listed as endangered. Recovery plans for both species advise the use of viability modeling as a tool for setting specific recovery and management targets. Population and Habitat Viability Assessment workshops were conducted to develop population targets and conservation recommendations for these species. Results of the workshops were based on modeling demographic and environmental factors, as well as discussions of management issues, management options, and public outreach strategies. The approach is intended to be iterative, and to be tracked by research and monitoring efforts. This paper discusses the consensus-building workshop process and how the approach could be useful to Partners in Flight. Population and Habitat Viability Assessments (PHVA) were used to develop population targets and conservation recommendations for Golden-cheeked Warblers (Dendroica chrysoparia) and Black-capped Vireos (Vireo atricapillus). This paper explains what PHVAs are, discusses how they are conducted, describes the general results that are produced, and suggests how Partners in Flight (PIF) might use a similar process for bird conservation planning. Detailed results of the assessments are not discussed here; however they can be found elsewhere (U. S. Fish and Wildlife Service 1996a, U. S. Fish and Wildlife Service 1996b). PHVAs were considered for Golden-cheeked Warblers and Black-capped Vireos because they are controversial, endangered species, and the species? recovery plans list PHVAs as tools to develop recovery recommendations. The U. S. Fish and Wildlife Service (USFWS) realized that the data needed to perform PHVAs for these species is limited, but that various conservation efforts, such as the Balcones Canyonlands Conservation Plan and other endeavors, were proceeding without benefit of the biological summarization and guidance that a PHVA could provide.

  7. NASA's Astronant Family Support Office

    NASA Technical Reports Server (NTRS)

    Beven, Gary; Curtis, Kelly D.; Holland, Al W.; Sipes, Walter; VanderArk, Steve

    2014-01-01

    During the NASA-Mir program of the 1990s and due to the challenges inherent in the International Space Station training schedule and operations tempo, it was clear that a special focus on supporting families was a key to overall mission success for the ISS crewmembers pre-, in- and post-flight. To that end, in January 2001 the first Family Services Coordinator was hired by the Behavioral Health and Performance group at NASA JSC and matrixed from Medical Operations into the Astronaut Office's organization. The initial roles and responsibilities were driven by critical needs, including facilitating family communication during training deployments, providing mission-specific and other relevant trainings for spouses, serving as liaison for families with NASA organizations such as Medical Operations, NASA management and the Astronaut Office, and providing assistance to ensure success of an Astronaut Spouses Group. The role of the Family Support Office (FSO) has modified as the ISS Program matured and the needs of families changed. The FSO is currently an integral part of the Astronaut Office's ISS Operations Branch. It still serves the critical function of providing information to families, as well as being the primary contact for US and international partner families with resources at JSC. Since crews launch and return on Russian vehicles, the FSO has the added responsibility for coordinating with Flight Crew Operations, the families, and their guests for Soyuz launches, landings, and Direct Return to Houston post-flight. This presentation will provide a summary of the family support services provided for astronauts, and how they have changed with the Program and families the FSO serves. Considerations for future FSO services will be discussed briefly as NASA proposes one year missions and beyond ISS missions. Learning Objective: 1) Obtain an understanding of the reasons a Family Support Office was important for NASA. 2) Become familiar with the services provided for astronauts and their families and how they changed with the Program and family needs.

  8. Telepresence work station system definition study, part 2

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This study effort has shown that the development of a space robotic servicing system is totally feasible. More importantly, many of the key elements of such a system are currently available as the result of previous and ongoing technical efforts. In many cases, decisions remain to be made concerning tradeoffs between options available to satisfy system technology requirements. The primary recommendation resulting from this study is for the development of a flight test bed system that could be used to establish a performance database to assist some of the necessary technical decisions described in the study package. A properly design flight test bed system would prove tremendously useful in terms of rapidly evaluating technology in a realistic setting and would be a great benefit in the development of the operational system.

  9. AJ26 engine test

    NASA Image and Video Library

    2011-12-15

    Stennis Space Center test-fired Aerojet AJ26 flight engine No. 8 on Dec. 15, continuing a commercial partnership with Orbital Services Corporation. Orbital has partnered with NASA to provide commercial cargo flights to the International Space Station. The AJ26 engines tested at Stennis will power the company's Taurus II space launch vehicle on the flights.

  10. 78 FR 66261 - Certified Flight Instructor Flight Reviews; Recent Pilot in Command Experience; Airmen Online...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... Command Experience; Airmen Online Services; Confirmation of Effective Date AGENCY: Federal Aviation... flight experience requirements do not apply to a pilot in command who is employed by a commuter or on-demand operator if the pilot in command is in compliance with the specific pilot in command...

  11. 14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...

  12. 14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...

  13. 14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...

  14. 14 CFR Appendix B to Subpart 1214... - Occupancy Fee Schedule

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... FLIGHT Reimbursement for Shuttle Services Provided to Civil U.S. Government Users and Foreign Users Who... flight one year or less, but more than six months before launch, the user shall reimburse NASA an... shared flight six months or less before launch, the user shall reimburse NASA an occupancy fee of 90% of...

  15. 14 CFR Special Federal Aviation... - Operating Limitations for Unscheduled Operations at Chicago's O'Hare International Airport

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... Hurley Air Traffic Control System Command Center. It is responsible for the administration of... 6). “Enhanced Computer Voice Reservation System (e-CVRS)” is the system used by the FAA to make... charter flights; hired aircraft service; ferry flights; and other non-passenger flights. Section 3...

  16. 14 CFR Section 11 - Functional Classification-Operating Expenses of Group II and Group III Air Carriers

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...

  17. 14 CFR Section 11 - Functional Classification-Operating Expenses of Group II and Group III Air Carriers

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) This function shall include expenses incurred directly in the in-flight operation of aircraft and... assignment to an in-flight status. (b) This function shall not include expenses incurred in repairing, servicing or storing aircraft, expenses incurred on the ground in protecting and controlling the in-flight...

  18. 14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...

  19. 14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...

  20. 14 CFR 375.37 - Certain business aviation activities using U.S.-registered foreign civil aircraft.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Passenger ground transportation. (9) Flight planning and weather contract services. (10) An additional... flight crew for that aircraft may collect from the other joint owners of that aircraft a share of the... for the specific flight. (5) Landing fees, airport taxes, and similar assessments. (6) Customs...

Top