7. Photographic copy of floor plan drawing, dated September 26, ...
7. Photographic copy of floor plan drawing, dated September 26, 1975, Selfridge ANG Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1583. - Selfridge Field, Building Nos. 1582, 1583, 1584, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
6. Photographic copy of floor plan drawing, dated August 10, ...
6. Photographic copy of floor plan drawing, dated August 10, 1968, Selfridge ANG Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLANS BLDGS. 1582 & 1584. - Selfridge Field, Building Nos. 1582, 1583, 1584, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
6. Photographic copy of floor plan drawing, dated August 18, ...
6. Photographic copy of floor plan drawing, dated August 18, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1585. - Selfridge Field, Building No. 1585, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
Photographic copy of floor plan drawing, dated March 7, 1968, ...
Photographic copy of floor plan drawing, dated March 7, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN BLDG. 1575 - Selfridge Field, Building No. 1575, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
75 FR 70061 - Dealer Floor Plan Pilot Program Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-16
... SMALL BUSINESS ADMINISTRATION Dealer Floor Plan Pilot Program Meeting AGENCY: U.S. Small Business... location, date, time, and agenda for a meeting regarding the Dealer Floor Plan Pilot Program established in... Plan Pilot Program meeting will be held on November 16, 2010 from approximately 9 a.m. to 12 p.m...
7. Photographic copy of floor plan drawing, dated August 10, ...
7. Photographic copy of floor plan drawing, dated August 10, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. - Selfridge Field, Building No. 592, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
6. Photographic copy of floor plan, dated August 10, 1968, ...
6. Photographic copy of floor plan, dated August 10, 1968, Department of the Air Force Air Defense Command Installation, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. - Selfridge Field, Building No. 1576, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
Photographic copy of floor plan drawing, dated August 10, 1968, ...
Photographic copy of floor plan drawing, dated August 10, 1968, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan - Selfridge Field, Building No. 1580, South of East Joy Boulevard, west of Taxiway C, Mount Clemens, Macomb County, MI
137. ARAII Building ARA602 floor plan as it appeared in ...
137. ARA-II Building ARA-602 floor plan as it appeared in 1980 when electrical modifications were being made. Shows partial layout of floor plan. EG&G Idaho, Inc. 1570-ARA-II-602-E-3. Date: April 1980. Ineel index code no. 070--0602-10-220-159761. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
11. Photographic copy of drawing dated February 17, 1908 (Source: ...
11. Photographic copy of drawing dated February 17, 1908 (Source: Salt River Project) Transformer building, first floor plan and sections (Transformer floor) - Theodore Roosevelt Dam, Transformer House, Salt River, Tortilla Flat, Maricopa County, AZ
LOFT. Containment and service building (TAN650) ground floor plan. Penetrations ...
LOFT. Containment and service building (TAN-650) ground floor plan. Penetrations in dome wall. Shielded personnel maze at airlock door. Reactor chamber floor hatches and holddowns. Rails in concrete floor. Kaiser engineers 6413-11-STEP/LOFT-650-A-2. Date: October 1964. INEEL index code no. 036-650-00-486-122214 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
131. ARAII Administration building (ARA613) floor plans for first and ...
131. ARA-II Administration building (ARA-613) floor plans for first and second floors. Includes roof plan. Shows use of rooms as offices, laboratory, conference room. F.C. Torkelson Company 842-area/SL-1-613-A-1. Date: October 1958. Ineel index code no. 070-0613-00-851-150718. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
57. PLANS OF FOURTH AND FIFTH FLOOR ADDITIONS TO BUILDINGS ...
57. PLANS OF FOURTH AND FIFTH FLOOR ADDITIONS TO BUILDINGS No. 2 and 4, DATED JUNE 24, 1937; SCHMIDT, GARDEN AND ERICKSON, ARCHITECTS - Underwriters' Laboratories, 207-231 East Ohio Street, Chicago, Cook County, IL
7. Photocopy of measured drawing dated December, 1947 SECOND FLOOR ...
7. Photocopy of measured drawing dated December, 1947 SECOND FLOOR PLAN An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME
6. Photocopy of measured drawing dated December, 1947 FIRST FLOOR ...
6. Photocopy of measured drawing dated December, 1947 FIRST FLOOR PLAN An addendum to Hanson-Cramer House, Sea Street, south end, Rockport, Knox County, Maine - Hanson-Cramer House, End of Sea Street (moved from Pascal's Avenue), Rockport, Knox County, ME
60. FIFTH FLOOR PLAN, SECTIONS AND DETAILS OF 1937 ADDITION ...
60. FIFTH FLOOR PLAN, SECTIONS AND DETAILS OF 1937 ADDITION TO BUILDINGS No. 2 and 4, DATED JUNE 24, 1937: SCHMIDT, GARDEN AND ERICKSON, ARCHITECTS - Underwriters' Laboratories, 207-231 East Ohio Street, Chicago, Cook County, IL
59. FOURTH FLOOR PLAN, SECTIONS AND DETAILS OF 1937 ADDITION ...
59. FOURTH FLOOR PLAN, SECTIONS AND DETAILS OF 1937 ADDITION TO BUILDINGS NO. 2 and 4, DATED JUNE 24, 1937; SCHMIDT, GARDEN AND ERICKSON, ARCHITECTS - Underwriters' Laboratories, 207-231 East Ohio Street, Chicago, Cook County, IL
73. New addition building 500 floor plan, drawing number AW600201, ...
73. New addition building 500 floor plan, drawing number AW-60-02-01, dated 26 January, 1970 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
72. SAC control center underground structure lower floor plan, drawing ...
72. SAC control center underground structure lower floor plan, drawing number 32-02-03, dated 1 February 1955 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
33. Photographic copy of architects plan dated October 1919 (original ...
33. Photographic copy of architects plan dated October 1919 (original in Possession of Montana State University, Bozeman Montana.) SECOND FLOOR PLAN - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT
32. Photographic copy of architects plan dated October 1919 (original ...
32. Photographic copy of architects plan dated October 1919 (original in possession of Montana State University, Bozeman, Montana.) FIRST FLOOR PLAN - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT
SPERTI Control Building (PER601) floor plan. Detail of cable inlet. ...
SPERT-I Control Building (PER-601) floor plan. Detail of cable inlet. Idaho Operations Office. Date: February 1955. INEEL index no. 760-0601-00-396-109139 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
34. Photographic copy of architects plan dated October 1919, (original ...
34. Photographic copy of architects plan dated October 1919, (original in possession of Montana State University, Bozeman, Montana.) REVISED PLAN AT 2nd FLOOR MAIN STAIRS - Hardin City Water Works, 101 East Fourth Street, Hardin, Big Horn County, MT
PBF Control Building (PER619) floor plan and elevations. Room numbers ...
PBF Control Building (PER-619) floor plan and elevations. Room numbers and functions. Roof plans for "high" roof and rest of roof. Ebasco Services 1205-PER/PER 619-A-1. Date: July 1965. INEEL index no. 760-0619-00-205-123022 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
A&M. TAN607 floor plan for first floor. Shows stepped door ...
A&M. TAN-607 floor plan for first floor. Shows stepped door plug design from hot shop into special services cubicle, cubicle windows, and other details. This drawing was re-drawn to show as-built conditions in 1985. Ralph M. Parsons 902-3-ANP-607-A 99. Date of original: January 1955. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-00-693-106751 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ADM. Fuel Pump House (TAN611). Elevations, floor plan. Drawing includes ...
ADM. Fuel Pump House (TAN-611). Elevations, floor plan. Drawing includes elevation and plans for "H.M." structures (Hose Storage?). Ralph M. Parsons 902-2-ANP-611-A 78 Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0611-00-693-106741 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
A&M. TAN607 floor plans. Shows three floor levels of pool, ...
A&M. TAN-607 floor plans. Shows three floor levels of pool, hot shop, and warm shop. Includes view of pool vestibule, personnel labyrinth, location of floor rails, and room numbers of office areas, labs, instrument rooms, and stairways. This drawing was re-drawn to show as-built features in 1993. Ralph M. Parsons 902-3-ANP-607-A 96. Date of original: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-00-693-106748 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
LOFT, TAN650. Service building preamp tower, top three floors. Floor ...
LOFT, TAN-650. Service building pre-amp tower, top three floors. Floor plan, cable mazes, duct labyrinth. Borated water tank enclosure on roof. Kaiser engineers 6413-11-STEP/LOFT-650-A-3. Date: October 1964. INEEL index code no. 036-650-00-486-122215 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
46. Photograph of an original construction drawing, dated August 1927, ...
46. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. SECOND FLOOR PLAN, ROOF PLANS, AND ROOF DETAILS; SHEET NO. 4 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
LPT. EBOR (TAN646). Floor plan for new helium management wing. ...
LPT. EBOR (TAN-646). Floor plan for new helium management wing. Detail of sample vault and basement switch room. Kaiser engineers EBOR/GA-646-A-101. Date: May 1963. INEEL index code no. 037-0646-00-486-119115 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ADM. Service Building (TAN603). Floor plan. Names of functional areas. ...
ADM. Service Building (TAN-603). Floor plan. Names of functional areas. Ralph M. Parsons 902-2-ANY-603-A 43. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 033-0603-00-693-106718 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ADM. Change House (TAN606). Elevations and floor plan. Room Names. ...
ADM. Change House (TAN-606). Elevations and floor plan. Room Names. Ralph M. Parsons 902-2-ANP-606-A 65. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0606-00-693-106733 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
ADM. Warehouse (TAN604) Floor plan. General warehouse and chemical storage. ...
ADM. Warehouse (TAN-604) Floor plan. General warehouse and chemical storage. Ralph M. Parsons 902-2-ANP-604-A 55. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0604-00-693-106727 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
16. Photocopy of drawing, floor system plan, Bridge No. 79B, ...
16. Photocopy of drawing, floor system plan, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 23, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT
LOFT. Containment and service building (TAN650) basement floor plan. Basement ...
LOFT. Containment and service building (TAN-650) basement floor plan. Basement airlock, shielded roadway, service areas, connection to control building. Kaiser engineers 6413-11-STEP/LOFT-650-A-1. Date: October 1964. INEEL index code no. 036-650-00-416-122213 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
160. ARAIII Service building (ARA610). Includes floor plan, north and ...
160. ARA-III Service building (ARA-610). Includes floor plan, north and west elevations, and section details. Aerojet-general 880-area/GCRE-610-A-1. Date: February 1958. Ineel index code no. 063-0610-00-013-102684. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
36. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING FLOOR ...
36. AS BUILT DRAWING OF TAN 629 HANGAR SHOWING FLOOR PLAN AND VICINITY PLAN RELATIONSHIP TO ADMINISTRATION AND MAINTENANCE AREA. RALPH M. PARSONS DRAWING NUMBER: 1229-2 ANP/GE 5-629-A-2. DATED MARCH 15, 1957. - Idaho National Engineering Laboratory, Test Area North, Hangar No. 629, Scoville, Butte County, ID
44. Photograph of an original construction drawing, dated August 1927, ...
44. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN; SHEET NO. 2 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
A&M. Demineralization plant, TAN649. Floor plan, elevation details. Ralph M. ...
A&M. Demineralization plant, TAN-649. Floor plan, elevation details. Ralph M. Parsons 1480-4-ANP/GE-3-649-A-1. Date: October 1958. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0649-00-693-107439 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
IET. Control and equipment building (TAN620) floor plan. Schedule of ...
IET. Control and equipment building (TAN-620) floor plan. Schedule of furniture and equipment. Ralph M. Parsons 902-4-ANP-A 320. Date: February 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0620-00-693-106905 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
138. ARAII Building ARA606 floor plan for remodel as Inel ...
138. ARA-II Building ARA-606 floor plan for remodel as Inel Welding Laboratory. Shows room divisions and welding stations to be installed. Aerojet Nuclear Company 1375-ARA-II-606-E-2. Date: June 1976. Ineel index code no. 070-0606-10-400-156552. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
45. Photograph of an original construction drawing, dated August 1927, ...
45. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. FIRST FLOOR PLAN AND DETAILS; SHEET NO. 3 OF 10 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
17. Photographic copy of original remodeling drawings dated July 8, ...
17. Photographic copy of original remodeling drawings dated July 8, 1988 (original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor plans - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
14. Photographic copy of sepia of original construction drawing dated ...
14. Photographic copy of sepia of original construction drawing dated September 15, 1938 (Original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor plans - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
FET. Control and equipment building (TAN630). Basement floor plan. Tunnel ...
FET. Control and equipment building (TAN-630). Basement floor plan. Tunnel to hangar (TAN-629). Electrical and chemical services. Ralph M. Parsons 1229-2 ANP/GE-630-A-1. Date: March 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 036-0630-00-693-107080 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
FET. Control and equipment building, TAN630. Main floor plan. Control ...
FET. Control and equipment building, TAN-630. Main floor plan. Control room. Room numbers and functions. Ralph M. Parsons. 1229-2-ANP/GE-5-630-A-2. Date: March 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 036-0630-00-693-107081 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
A&M. TAN607. Foundation plan for hot shop floor and pool. ...
A&M. TAN-607. Foundation plan for hot shop floor and pool. Tunnels to turntable. Motor pit. Ralph M. Parsons 902-3-ANP-607-S128. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-62-693-160722 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
148. ARAIII Reactor building (ARA608) Floor plan. Shows location of ...
148. ARA-III Reactor building (ARA-608) Floor plan. Shows location of reactor, heater, and mechanical loop pits; mechanical and electrical equipment rooms; and other work areas. Aerojet-general 880-area/GCRE-608-A-1. Date: February 1958. Ineel index code no. 063-0608-00-013-102612. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
61. Photocopy of Engine Room Floor Plan, White Alder. The ...
61. Photocopy of Engine Room Floor Plan, White Alder. The Niagara Shipbuilding Corp. Engineering Department, Buffalo, New York. Coast Guard Headquarters Drawing No. 540-WAGL-1604-10, dated February 1943; revised January 1963. Original drawing property of the U.S. Coast Guard. - U.S. Coast Guard Cutter WHITE HEATH, USGS Integrated Support Command Boston, 427 Commercial Street, Boston, Suffolk County, MA
A&M. TAN607 second floor plan for cold assembly area. Metallurgical ...
A&M. TAN-607 second floor plan for cold assembly area. Metallurgical lab, chemistry lab, nuclear instrument lab, equipment rooms. Ralph M. Parsons 902-ANP-607-A 102. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-693-106754 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
43. Photograph of an original construction drawing, dated October 1927, ...
43. Photograph of an original construction drawing, dated October 1927, in the possession of Facilities Planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN, REFRIGERATION LAYOUT AND DETAILS; SHEET R-1 OF 1 SHEET - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
18. Photographic copy of original remodeling drawings dated July 8, ...
18. Photographic copy of original remodeling drawings dated July 8, 1988 (original sepia in plan room of Base Civil Engineer, Scott AFB) First and second floor demolition and framing plan - Scott Air Force Base, General Officer Quarters, 229 Birchard Street, O'Fallon, St. Clair County, IL
6. Photographic copy of blueprint dated 1929; Henschien & McLaren, ...
6. Photographic copy of blueprint dated 1929; Henschien & McLaren, Chicago, architects; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; PLAN OF KILLING FLOOR IN 1929 BEEF HOUSE; CATTLE WERE SKINNED ON THE FLOOR IN PRITCHING AREA NEAR CENTER OF DRAWING - Rath Packing Company, Cooler Building-1929 Beef House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
143. ARAIII Control building (ARA607) Floor plan. Shows control room, ...
143. ARA-III Control building (ARA-607) Floor plan. Shows control room, contaminated work area, counting and computer room, health physics room, instrument repair room, offices, and other rooms. Aerojet-general 880-area/GCRE-607-A-1. Date: February 1958. Ineel index code no. 063-0607-00-013-102546. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
SPERTI Gate House at control area (PER603). Floor plan, elevations, ...
SPERT-I Gate House at control area (PER-603). Floor plan, elevations, sections. This Gate House replaced the original gate house, for which drawings are no longer extant. F.C. Torkelson 842-SPERT-603-A-1. Date: February 1962. INEEL index no. 760-0603-00-851-151336 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
A&M. TAN633. Hot cell floor plans, elevations, sections. Hole schedule ...
A&M. TAN-633. Hot cell floor plans, elevations, sections. Hole schedule (penetrations through concrete). Swing-door details. Ralph M. Parsons 1229-13-ANP/GE-3-633-A-3. Date: December 1956. Approved by INEEL Classification Office for public release. INNEL index code no. 034-0633-00-693-107317 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
11. Photographic copy of construction drawing, dated July 29, 1932, ...
11. Photographic copy of construction drawing, dated July 29, 1932, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2511 SDO 139 (FLOOR PLANS) - Selfridge Field, Building Nos. 246 & 253, 246 Birch Street & 253 Wagner Street, Mount Clemens, Macomb County, MI
10. Photographic copy of construction drawing, dated February 6, 1931, ...
10. Photographic copy of construction drawing, dated February 6, 1931, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FOUNDATION, FIRST FLOOR PLANS, ELEVATIONS, DETAILS, PLAN NO. 6658-130. - Selfridge Field, Building No. 121, Wilbur Wright Avenue west of Ash Street, Mount Clemens, Macomb County, MI
51. Photograph of an original construction drawing, dated August 1927, ...
51. Photograph of an original construction drawing, dated August 1927, in the possession of Facilities planning Office, Iowa State University, Ames, Iowa. GROUND FLOOR PLAN, MECHANICAL FAN ROOM LAYOUT, ELECTRICAL WIRING DIAGRAM, RADIATOR, FANS 1 & 2, DETAILS; SHEET NO. 202 OF 3 - Dairy Industry Building, Iowa State University campus, Ames, Story County, IA
A&M. TAN607 third floor plan for hot shop. Crane control ...
A&M. TAN-607 third floor plan for hot shop. Crane control rooms and their shielding windows. Plenum. Wall rack for manipulators in hot shop. Ralph M. Parsons 902-3-ANP-607-A 103. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0607-00-693-106755 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Photographic copy of construction drawing, dated November 17, 1961, Department ...
Photographic copy of construction drawing, dated November 17, 1961, Department of the Air Force, Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN, EQUIPMENT LAYOUT, SITE PLAN, DRAWING NO. P20-130-002 - Selfridge Field, Building No. 1025, Doolittle Drive north of D Street, Mount Clemens, Macomb County, MI
12. Photographic copy of construction drawing, dated June 7, 1933, ...
12. Photographic copy of construction drawing, dated June 7, 1933, Construction Division Office of the Quartermaster General, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. PLAN 625-2517, SDO 186 F41 (FLOOR PLAN) - Selfridge Field, Building Nos. 248, 252 & 254, 248 Birch Street & 252, 254 Wagner Street, Mount Clemens, Macomb County, MI
A&M. TAN607 second floor plan for hot shop. Roof of ...
A&M. TAN-607 second floor plan for hot shop. Roof of pool. Viewing window locations. Special equipment room. This drawing was re-drawn to show conditions in 1994. Ralph M. Parsons 902-3-ANP-607-A 101. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-060-00-693-106753 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
7. "CONTROL BUILDING; FLOOR PLAN, ELEVATIONS AND DETAILS." Specifications No. ...
7. "CONTROL BUILDING; FLOOR PLAN, ELEVATIONS AND DETAILS." Specifications No. OC1-59-53; Drawing No. 5841-A-1; D.O. SERIES AW1525/2 Rev. B. Stamped: RECORD DRAWING AS CONSTRUCTED. Below stamp: Contract No. 5619, Rev. B. Date: 7-8-59. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
A&M. Hot cell addition (TAN633). Floor plan, elevations. Arrangement of ...
A&M. Hot cell addition (TAN-633). Floor plan, elevations. Arrangement of monorail along corridor, four hot cells, plug access openings, viewing windows, photo darkroom. Ralph M. Parsons 1229-13-ANP/GE-3-633-A-1. Date: December 1956 as redrawn in August 1998. Approved by INEEL Classification Office for public release. INEEL index code no. 034-0633-00-693-107315 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
117. ARAI Shop and maintenance (ARA627) building roof and floor ...
117. ARA-I Shop and maintenance (ARA-627) building roof and floor plan. Includes room finish and equipment schedule. Norman Engineering Company 961-area/SF-627-A-1. Date: January 1959. Ineel index code no. 068-0627-00-613-102759. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
38. Photographic copy of original construction drawing, dated June 1911 ...
38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
39. Photographic copy of original construction drawing, dated June 1911 ...
39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID
A&M. TAN607 first floor plan for cold assembly area. Shows ...
A&M. TAN-607 first floor plan for cold assembly area. Shows special source vaults, X-ray room, instrument shops, and positions of large machines in component test laboratory. This drawing was re-drawn to show conditions in 1994. Ralph M. Parsons 902-3-ANP-607-A 100. Date of original: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 034-060-00-693-106752 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
2. Photographic copy of original construction drawings, dated 30 September ...
2. Photographic copy of original construction drawings, dated 30 September 1930, located at the John Gaw Meem Archive of Southwestern Architecture, Special Collections, University of New Mexico, Albuquerque, New Mexico. FIRST FLOOR PLAN. - St. Anthony's Orphanage, 1500 Indian School Road, Northwest, Albuquerque, Bernalillo County, NM
127. ARAII Administrative and technical support building (ARA606) ground floor ...
127. ARA-II Administrative and technical support building (ARA-606) ground floor plan. Indicates use of rooms for classrooms, offices, and lunch room. C.A. Sundberg and Associates 866-area-ALPR-606-A-2. Date: June 1958. Ineel index code no. 070-0606-00-822-102825. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
2. Photographic copy of original design drawing, dated January 1970 ...
2. Photographic copy of original design drawing, dated January 1970 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) First floor plan - Stanley R. Mickelsen Safeguard Complex, Universal Missile Building, Between Tactical Road South & Patrol Road, Nekoma, Cavalier County, ND
13. Photocopy of original construction drawing, dated November 1932 (original ...
13. Photocopy of original construction drawing, dated November 1932 (original print in possession of Veterans Administration, Oakland Branch, Pittsburgh, Pennsylvania). DRAWING 32-3 -- ADMINISTRATION BUILDING, BUILDING NO. 32 -- FIRST AND SECOND FLOOR PLANS. - VA Medical Center, Aspinwall Division, Administration Building, 5103 Delafield Avenue, Aspinwall, Allegheny County, PA
Photograph of original drawing (original in possession of National Passenger ...
Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Basement Floor Plan / Alterations and Additions (dated 5/1913). Proposed plan - not used - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA
5. Photographic copy of construction drawing, dated March (?), 1959, ...
5. Photographic copy of construction drawing, dated March (?), 1959, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN, SHEET 1 OF 1, DRAWING SLF-440-022. - Selfridge Field, Building No. 101, Supply Street east of Maple Street, Mount Clemens, Macomb County, MI
Photographic copy of original design drawing, dated May 1971, revised ...
Photographic copy of original design drawing, dated May 1971, revised 1 May 1974 (original Army Operational Drawing in the possession of the U.S. Army Corps of Engineers, Huntsville Division). Floor plan and schedules - Stanley R. Mickelsen Safeguard Complex, Limited Area Sentry Station, Between Access Road & Patrol Road, Nekoma, Cavalier County, ND
53. Photocopy of Structural drawing, dated August 6, 1976 by ...
53. Photocopy of Structural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. S-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIRST FLOOR PLAN. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
25. Photographic copy of original design drawing, dated January 1970, ...
25. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite second floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
24. Photographic copy of original design drawing, dated January 1970, ...
24. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite mezzanine floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
23. Photographic copy of original design drawing, dated January 1970, ...
23. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite first floor plan - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
Photographic copy of original design drawing, dated January 1970, revised ...
Photographic copy of original design drawing, dated January 1970, revised 24 May 1972 (original Army Operational Drawing in the possession of U.S. Army Corps of Engineers, Huntsville, Division). MSRPP general floor plan, lower level - Stanely R. Mickelsen Safeguard Complex, Missile Site Radar Power Plant, Southeast of, & adjacent to, Missile Site Control Building, Nekoma, Cavalier County, ND
44. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...
44. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown FIRST FLOOR PLAN - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA
45. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...
45. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown SECOND FLOOR PLAN - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA
2. Historic American Buildings Survey Photocopy: Albern Color Research, Inc. ...
2. Historic American Buildings Survey Photocopy: Albern Color Research, Inc. August, 1960 FIRST AND SECOND FLOOR PLANS DATED OCTOBER 28, 1914 - Dartmouth College, Webster Cottage, 27B Main Street, Hanover, Grafton County, NH
4. Photographic copy of inkcolinen drawing dated 1923; Henschien & ...
4. Photographic copy of ink-co-linen drawing dated 1923; Henschien & McLaren Architects, Chicago; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; FOURTH FLOOR PLAN, HOG KILLING DEPARTMENT IN BUILDING 40 - Rath Packing Company, Hog Killing & By-Products Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
8. Photographic copy of original construction drawing, dated August 10, ...
8. Photographic copy of original construction drawing, dated August 10, 1976, Civil Engineering, Selfridge Air National Guard Base, in possession of Selfridge Base Museum, Mt. Clemens, Michigan, ALTER AIRCRAFT SHELTERS, FLOOR PLAN BUILDING NO. 21, DRAWINGS SLF-210-163. - Selfridge Field, Building Nos. 20 & 21, East Ramp south of intersection of Wilbur Wright & Birch Streets, Mount Clemens, Macomb County, MI
28. Photographic copy of original design drawing, dated January 1970, ...
28. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite fourth floor plan, equipment and access platforms - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
22. Photographic copy of original design drawing, dated January 1970, ...
22. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Partial underfloor plan of first floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
Vehmeijer, Maarten; van Eijnatten, Maureen; Liberton, Niels; Wolff, Jan
2016-08-01
Fractures of the orbital floor are often a result of traffic accidents or interpersonal violence. To date, numerous materials and methods have been used to reconstruct the orbital floor. However, simple and cost-effective 3-dimensional (3D) printing technologies for the treatment of orbital floor fractures are still sought. This study describes a simple, precise, cost-effective method of treating orbital fractures using 3D printing technologies in combination with autologous bone. Enophthalmos and diplopia developed in a 64-year-old female patient with an orbital floor fracture. A virtual 3D model of the fracture site was generated from computed tomography images of the patient. The fracture was virtually closed using spline interpolation. Furthermore, a virtual individualized mold of the defect site was created, which was manufactured using an inkjet printer. The tangible mold was subsequently used during surgery to sculpture an individualized autologous orbital floor implant. Virtual reconstruction of the orbital floor and the resulting mold enhanced the overall accuracy and efficiency of the surgical procedure. The sculptured autologous orbital floor implant showed an excellent fit in vivo. The combination of virtual planning and 3D printing offers an accurate and cost-effective treatment method for orbital floor fractures. Copyright © 2016 American Association of Oral and Maxillofacial Surgeons. Published by Elsevier Inc. All rights reserved.
121. ARAI Guard house (ARA628). Drawing shows north, south, east, ...
121. ARA-I Guard house (ARA-628). Drawing shows north, south, east, and west elevations, floor plan, counter details, and roof plan. Norman Engineering Corporation 961-area/SF-628-A-1. Date: January 1959. Ineel index code no. 063-0628-00-613-102772. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
9. Photocopy of drawing (Original in possession of National Archives ...
9. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown FIRST FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE
8. Photocopy of drawing (Original in possession of National Archives ...
8. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown BASEMENT FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE
10. Photocopy of drawing (Original in possession of National Archives ...
10. Photocopy of drawing (Original in possession of National Archives and Record Service, Record Group 92) Delineator unknown, Date unknown SECOND FLOOR PLAN - Omaha Quartermaster Depot Historic District, Twenty-second & Woolworth Streets, Omaha, Douglas County, NE
35. SECOND FLOOR WEST ROOM LOOKING NORTH. The two trusses ...
35. SECOND FLOOR WEST ROOM LOOKING NORTH. The two trusses above this room date from 1812. They differ from the 1755 salvaged trusses in that they are made of pine rather than poplar, their numbering system differs, and they do not have pockets for joists. These two trusses were added to extend the plan of the building when it was re-erected in 1812. - Twelfth Street Meeting House, 20 South Twelfth Street, Philadelphia, Philadelphia County, PA
11. Historic American Buildings Survey Photocopy of ink on linen ...
11. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts SECOND FLOOR PLAN - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA
10. Historic American Buildings Survey Photocopy of ink on linen ...
10. Historic American Buildings Survey Photocopy of ink on linen drawing dated 1878, Longfellow & Clark, in possession of owner, 70 Sparks Street, Cambridge Street, Massachusetts FIRST FLOOR PLAN - Edward S. Dodge House, 70 Sparks Street, Cambridge, Middlesex County, MA
9. Photographic copy of blueprint dated 1931; H.P. Henschien, Chicago, ...
9. Photographic copy of blueprint dated 1931; H.P. Henschien, Chicago, architect; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloom, Iowa; PLAN OF HOG DRESSING FLOOR ON 4TH LEVEL OF BUILDING 92; SHOWS LAYOUT OF DRESSING EQUIPMENT - Rath Packing Company, Hog Dressing Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
ADM. Water well pump houses (TAN612 and TAN613). Plans, elevations, ...
ADM. Water well pump houses (TAN-612 and TAN-613). Plans, elevations, floor and other details. Ralph M. Parsons 902-2-ANP-612-613-A S & P 82. Date: December 1952. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0612-00-693-106743 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
6. Photograph of a photograph in possession of Rock Island ...
6. Photograph of a photograph in possession of Rock Island Arsenal Historical Office. BASEMENT, SHOWING ORIGINAL OPEN INTERIOR FLOOR PLAN. DATED C. 1898. - Rock Island Arsenal, Building No. 62, Rodman Avenue between First & Second Streets, Rock Island, Rock Island County, IL
77 FR 21559 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-10
... FEDERAL ELECTION COMMISSION Sunshine Act Meeting AGENCY: Federal Election Commission. DATE AND TIME: Thursday, April 12, 2012 at 10 a.m. PLACE: 999 E Street NW., Washington, DC (Ninth Floor). STATUS.... Draft Advisory Opinion 2012-11: Free Speech. Management and Administrative Matters. Individuals who plan...
Photograph of original drawing (original in possession of National Passenger ...
Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: First Floor Plan / Alterations and Additions (dated: 7/17/14) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA
Photograph of original drawing (original in possession of National Passenger ...
Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: First Floor Plan / Alterations and Additions (dated: 5/1913) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA
19. Photocopy of scaled drawing (from the Engineering Office of ...
19. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 9, 1957. First floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
20. Photocopy of scaled drawing (from the Engineering Office of ...
20. Photocopy of scaled drawing (from the Engineering Office of the Veterans Administration) originally drawn by Trone, November 9, 1933. Final revisions date December 6, 1957. Second floor plan. - Roanoke Veterans Administration Hospital, Building No. 6, 1970 Roanoke Boulevard, Salem, Salem, VA
Photograph of original drawing (original in possession of National Passenger ...
Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Second Floor Plan (dated: 5/1/25, rev. 9/28/42) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA
IET. Coupling station (TAN620), plans and sections. Concrete shielding walls ...
IET. Coupling station (TAN-620), plans and sections. Concrete shielding walls and boron surface treatment. Elevation shows two floor levels, position of periscopes, and stairways. Ralph M. Parsons 902-4-ANP-602-A 325. Date: February 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0620-00-693-106910 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
122. ARAI Pump House (ARA629). Drawing shows north, south, east, ...
122. ARA-I Pump House (ARA-629). Drawing shows north, south, east, and west elevations, floor plan, foundation plan, and other details. Note small enclosure at southwest corner of building to contain chlorination equipment. Norman Engineering Company 961-area/SF-629-A-1. Date: January 1959. Ineel index code no. 068-0629-00-613-102774. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Bidding-based autonomous process planning and scheduling
NASA Astrophysics Data System (ADS)
Gu, Peihua; Balasubramanian, Sivaram; Norrie, Douglas H.
1995-08-01
Improving productivity through computer integrated manufacturing systems (CIMS) and concurrent engineering requires that the islands of automation in an enterprise be completely integrated. The first step in this direction is to integrate design, process planning, and scheduling. This can be achieved through a bidding-based process planning approach. The product is represented in a STEP model with detailed design and administrative information including design specifications, batch size, and due dates. Upon arrival at the manufacturing facility, the product registered in the shop floor manager which is essentially a coordinating agent. The shop floor manager broadcasts the product's requirements to the machines. The shop contains autonomous machines that have knowledge about their functionality, capabilities, tooling, and schedule. Each machine has its own process planner and responds to the product's request in a different way that is consistent with its capabilities and capacities. When more than one machine offers certain process(es) for the same requirements, they enter into negotiation. Based on processing time, due date, and cost, one of the machines wins the contract. The successful machine updates its schedule and advises the product to request raw material for processing. The concept was implemented using a multi-agent system with the task decomposition and planning achieved through contract nets. The examples are included to illustrate the approach.
Photograph of original drawing (original in possession of National Passenger ...
Photograph of original drawing (original in possession of National Passenger Railroad Corporation). STATION BUILDING: Ground Floor Plan / Alterations and Additions (dated: 7/17/14, rev. 10/21/14) - North Philadelphia Station, 2900 North Broad Street, on northwest corner of Broad Street & Glenwood Avenue, Philadelphia, Philadelphia County, PA
78 FR 57154 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-17
... FEDERAL RETIREMENT THRIFT INVESTMENT BOARD Sunshine Act Meeting TIME AND DATE: 9:00 a.m. (Eastern Time) September 23, 2013. PLACE: 10th Floor Board Meeting Room, 77 K Street NE., Washington, DC 20002... of the Minutes of the August 9, 2013 Board Member Meeting 2. Thrift Savings Plan Activity Reports by...
77 FR 24840 - Safety Zone; Crowley Barge 750-2, Bayou Casotte, Pascagoula, MS
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... as any changes in the planned schedule. Dated: April 4, 2012. D.J. Rose, Captain, U.S. Coast Guard...-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey... holidays and U.S. Coast Guard Sector Mobile (spw), Building 102, Brookley Complex South Broad Street Mobile...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
...), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey Avenue... Department of Transportation, West Building, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m... Federal Register (73 FR 3316). Public Meeting We do not now plan to hold a public meeting. But you may...
135. ARAII SLI decontamination and lay down building (ARA614) north, ...
135. ARA-II SL-I decontamination and lay down building (ARA-614) north, south, east, and west elevations, floor plan, and detail of doors. F.C. Torkelson Company 842-area/SL-1-614-A-1. Date: September 1960. Ineel index code no. 070-0614-00-851-150061. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
IET. Exclusion guard house (TAN621) and unit substation (TAN622). Elevations ...
IET. Exclusion guard house (TAN-621) and unit substation (TAN-622). Elevations and floor plan. Also show concrete pad for substation. Ralph M. Parsons 902-4-ANP-621-622-A&S 411. Date: February 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0621-60-693-106968 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
120. Back side technical facilities S.R. radar transmitter & computer ...
120. Back side technical facilities S.R. radar transmitter & computer building no. 102, section II "foundation & first floor plan" - structural, AS-BLT AW 35-46-04, sheet 65, dated 23 January, 1961. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
120. ARAI Expansion of ARA627 shop and maintenance building for ...
120. ARA-I Expansion of ARA-627 shop and maintenance building for new use as materials and metallurgy laboratory. Shows ground floor plan addition of gas analyzer room, fatigue testing room, microscope room, and offices. Idaho Nuclear Corporation 1230-ARA-627-A-5. Date: June 1970. Ineel index code no. 068-0627-00-400-154062. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID
Refrigeration Plant, North Elevation, Second Floor Plan, East Elevation, Ground ...
Refrigeration Plant, North Elevation, Second Floor Plan, East Elevation, Ground Floor Plan, Section A-A - Kennecott Copper Corporation, On Copper River & Northwestern Railroad, Kennicott, Valdez-Cordova Census Area, AK
31. Stair Plans / First Floor, Second Floor, Section Stair ...
31. Stair Plans / First Floor, Second Floor, Section Stair Bulkhead, F.S. Tread & Riser (drawing 8) - Whittier State School, Hospital & Receiving Building, 11850 East Whittier Boulevard, Whittier, Los Angeles County, CA
PBF (PER620) interior. Counting room, main floor. Date: May 2004. ...
PBF (PER-620) interior. Counting room, main floor. Date: May 2004. INEEL negative no. HD-41-6-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Sampling and analysis plan for sludge located on the floor and in the pits of the 105-K basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
BAKER, R.B.
1998-11-20
This Sampling and Analysis Plan (SAP) provides direction for the sampling of the sludge found on the floor and in the remote pits of the 105-K Basins to provide: (1) basic data for the sludges that have not been characterized to-date and (2) representative Sludge material for process tests to be made by the SNF Project/K Basins sludge treatment process subproject. The sampling equipment developed will remove representative samples of the radioactive sludge from underwater at the K Basins, depositing them in shielded containers for transport to the Hanford Site laboratories. Included in the present document is the basic backgroundmore » logic for selection of the samples to meet the requirements established in the Data Quality Objectives (DQO), HNF-2033, for this sampling activity. The present document also includes the laboratory analyses, methods, procedures, and reporting that will be required to meet the DQO.« less
Automatic Generation of Indoor Navigable Space Using a Point Cloud and its Scanner Trajectory
NASA Astrophysics Data System (ADS)
Staats, B. R.; Diakité, A. A.; Voûte, R. L.; Zlatanova, S.
2017-09-01
Automatic generation of indoor navigable models is mostly based on 2D floor plans. However, in many cases the floor plans are out of date. Buildings are not always built according to their blue prints, interiors might change after a few years because of modified walls and doors, and furniture may be repositioned to the user's preferences. Therefore, new approaches for the quick recording of indoor environments should be investigated. This paper concentrates on laser scanning with a Mobile Laser Scanner (MLS) device. The MLS device stores a point cloud and its trajectory. If the MLS device is operated by a human, the trajectory contains information which can be used to distinguish different surfaces. In this paper a method is presented for the identification of walkable surfaces based on the analysis of the point cloud and the trajectory of the MLS scanner. This method consists of several steps. First, the point cloud is voxelized. Second, the trajectory is analysing and projecting to acquire seed voxels. Third, these seed voxels are generated into floor regions by the use of a region growing process. By identifying dynamic objects, doors and furniture, these floor regions can be modified so that each region represents a specific navigable space inside a building as a free navigable voxel space. By combining the point cloud and its corresponding trajectory, the walkable space can be identified for any type of building even if the interior is scanned during business hours.
Floor Plans Foundation Plan at Bedrock and Subgrade Level ...
Floor Plans - Foundation Plan at Bedrock and Subgrade Level Plan - Marshall Space Flight Center, F-1 Engine Static Test Stand, On Route 565 between Huntsville and Decatur, Huntsville, Madison County, AL
116. Photographic copy of drawing (25 June 1917, original drawing ...
116. Photographic copy of drawing (25 June 1917, original drawing in Archives, Office of the Building, Administration Building, Sears, Roebuck and Company Mail Order Plant, Chicago, Illinois). Drawn by Sears Department 131. 1/64 inch to one foot. Schematic plan of the Merchandise Building, describing the type of construction of the different portions of the building and shows the layout of the railroad tracks around the building. At the date of this drawing the building had all the major additons complete (to Annex A, Annex B, and the Box Factory). SCHETMATIC FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL
ETR ELECTRICAL BUILDING, TRA648. FLOOR PLANS FOR FIRST FLOOR AND ...
ETR ELECTRICAL BUILDING, TRA-648. FLOOR PLANS FOR FIRST FLOOR AND BASEMENT. SECTIONS. KAISER ETR-5528-MTR-648-A-2, 12/1955. INL INDEX NO. 532-0648-00-486-101402, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
9. Photographic copy of first and second floor plans, undated, ...
9. Photographic copy of first and second floor plans, undated, Department of the Air Force, Air Defense Command Installations, Washington, D.C., in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLANS. - Selfridge Field, Building No. 509, Sugarbush Road east of West Perimeter Road, Mount Clemens, Macomb County, MI
Middle-Level Preservice Mathematics Teachers' Mental Representations of Classroom Floor Plans
ERIC Educational Resources Information Center
Matteson, Shirley M.; Ganesh, Bibi S.; Coward, Fanni L.; Patrick, Patricia
2012-01-01
This study reports the results of an innovative assignment in which preservice teachers' mental representations were examined through drawing floor plans of an "ideal middle-level mathematics classroom." The 41 middle-level mathematics preservice teachers created two floor plans, one at the beginning of the semester and the other for the…
ETR, TRA642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTORGENERATOR ...
ETR, TRA-642. FLOOR PLAN UNDER BALCONY ON CONSOLE FLOOR. MOTOR-GENERATOR SETS AND OTHER ELECTRICAL EQUIPMENT. PHILLIPS PETROLEUM COMPANY ETR-D-1781, 7/1960. INL INDEX NO. 532-0642-00-706-020384, REV. 1. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... DEPARTMENT OF COMMERCE International Trade Administration [A-570-970] Multilayered Wood Flooring... Commerce (``Department'') received a petition concerning imports of multilayered wood flooring from the...: Multilayered Wood Flooring from the People's Republic of China dated October 21, 2010 (``Petition''). On...
29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVEGRADE ...
29. FLOOR PLAN OF WASTE CALCINATION FACILITY SHOWING MAIN ABOVE-GRADE FLOOR LEVEL. INEEL DRAWING NUMBER 200-0633-00-287-106354. FLUOR NUMBER 5775-CPP-633-A-4. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda ...
SECOND FLOOR AND ROOF PLANS. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. Second floor plan, and roof plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. A2 of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/22/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
Floor Plans Fuel Tank Support, Fuel Platform, and LOX ...
Floor Plans - Fuel Tank Support, Fuel Platform, and LOX Platform Plans - Marshall Space Flight Center, F-1 Engine Static Test Stand, On Route 565 between Huntsville and Decatur, Huntsville, Madison County, AL
Floor Plans Rolling Platform, Tech Systems Platform, and Load ...
Floor Plans - Rolling Platform, Tech Systems Platform, and Load Platform Plans - Marshall Space Flight Center, F-1 Engine Static Test Stand, On Route 565 between Huntsville and Decatur, Huntsville, Madison County, AL
NASA Astrophysics Data System (ADS)
Schnepp, Elisabeth; Pucher, Rudolf; Goedicke, Christian; Manzano, Ana; Müller, Uwe; Lanos, Philippe
2003-02-01
A record of about 450 years of geomagnetic secular variation is presented from a single archaeological site in Lübeck (Germany) where a sequence of 25 bread oven floors has been preserved in a bakery from medieval times until today. The age dating of the oven-floor sequence is based on historical documents, 14C-dating and thermoluminescence dating. It confines the time interval from about 1300 to 1800 A.D. Paleomagnetic directions have been determined from each oven floor by means of 198 oriented hand samples. After alternating field as well as thermal demagnetization experiments, the characteristic remanent magnetization direction was obtained using principal component analysis. The mean directions of 24 oven floors are characterized by high Fisherian precision parameters (>146) and small α95 confidence limits (1.2°-4.6°). For obtaining a smooth curve of geomagnetic secular variation for Lübeck, a spherical spline function was fitted to the data using a Bayesian approach, which considers not only the obtained ages, but also stratigraphic order. Correlation with historical magnetic records suggests that the age estimation for the upper 10 layers was too young and must date from the end of the sixteenth to the mid of the eighteenth century. For the lowermost 14 layers, dating is reliable and provides a secular variation curve for Germany. The inclination shows a minimum in the fourteenth century and then increases by more than 10°. Declination shows a local minimum around 1400 A.D. followed by a maximum in the seventeenth century. This is followed by the movement of declination about 30° to western directions.
23. VIEW OF THE FIRST FLOOR PLAN. THE FIRST FLOOR ...
23. VIEW OF THE FIRST FLOOR PLAN. THE FIRST FLOOR HOUSED ADMINISTRATIVE OFFICES, THE CENTRAL COMPUTING, UTILITY SYSTEMS, ANALYTICAL LABORATORIES, AND MAINTENANCE SHOPS. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
PBF Reactor Building (PER620). Floor at left of view is ...
PBF Reactor Building (PER-620). Floor at left of view is floor of first basement. Photographer: Farmer/Capek. Date: March 17, 1967. INEEL negative no. 67-1753 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
Section NN, showing steel roof trusses, mezzanine iron railing, first ...
Section NN, showing steel roof trusses, mezzanine iron railing, first floor doors, etc. San Bernardino Valley Union Junior College, Library Building. Also includes steel truss roof plan and a small stress diagram of the truss. Howard E. Jones, Architect, San Bernardino, California. Sheet 8, job no. 315. Scales 1/2 inch to the foot (section), and 1/8 and 1/16 inch to the foot. No date given on sheet (probably March or April, 1927). - San Bernardino Valley College, Library, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
7 CFR 3201.39 - Floor strippers.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Floor strippers. 3201.39 Section 3201.39 Agriculture... Items § 3201.39 Floor strippers. (a) Definition. Products that are formulated to loosen waxes, resins... strippers. By that date, Federal agencies that have the responsibility for drafting or reviewing...
7 CFR 3201.39 - Floor strippers.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Floor strippers. 3201.39 Section 3201.39 Agriculture... Items § 3201.39 Floor strippers. (a) Definition. Products that are formulated to loosen waxes, resins... strippers. By that date, Federal agencies that have the responsibility for drafting or reviewing...
7 CFR 3201.39 - Floor strippers.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Floor strippers. 3201.39 Section 3201.39 Agriculture... Items § 3201.39 Floor strippers. (a) Definition. Products that are formulated to loosen waxes, resins... strippers. By that date, Federal agencies that have the responsibility for drafting or reviewing...
21. VIEW OF THE FIRST FLOOR PLAN. THE FIRST FLOOR ...
21. VIEW OF THE FIRST FLOOR PLAN. THE FIRST FLOOR WAS USED FOR DEPLETED AND ENRICHED URANIUM FABRICATION. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, Uranium Rolling & Forming Operations, Southeast section of plant, southeast quadrant of intersection of Central Avenue & Eighth Street, Golden, Jefferson County, CO
22. VIEW OF THE SECOND FLOOR PLAN. THE SECOND FLOOR ...
22. VIEW OF THE SECOND FLOOR PLAN. THE SECOND FLOOR CONTAINS THE AIR PLENUM ND SOME OFFICE SPACE. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, Uranium Rolling & Forming Operations, Southeast section of plant, southeast quadrant of intersection of Central Avenue & Eighth Street, Golden, Jefferson County, CO
7. FLOOR PLAN, PLOT PLAN, ELEVATIONS, SHEET NO. 11044/1 OF ...
7. FLOOR PLAN, PLOT PLAN, ELEVATIONS, SHEET NO. 1-10-44/1 OF 11. (NOTE: BUILDINGS 821-823 WERE CONSTRUCTED FROM A SINGLE SET OF PLANS. SOME DRAWINGS ARE TYPICAL OF ALL 3 STRUCTURES, CERTAIN OTHER DRAWINGS IN THE SAME SET ARE BUILDING-SPECIFIC.) - Oakland Army Base, Storehouse Type, Ukraine & Maritime Streets, Oakland, Alameda County, CA
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), SECOND FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), SECOND FLOOR SHOWING PROCESS MAKEUP AREA AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING COLD LAB, DECONTAMINATION ROOM, MULTICURIE CELL ROOM, AND OFFICES. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051980. ALTERNATE ID NUMBER CPP-E-1980. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601), FIRST FLOOR SHOWING ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601), FIRST FLOOR SHOWING SAMPLE CORRIDORS AND EIGHTEEN CELLS AND ADJOINING REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL FACILITIES LAB, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. TO LEFT ARE LABORATORY BUILDING (CPP-602) AND MAINTENANCE BUILDING (CPP-630). INL DRAWING NUMBER 200-0601-00-706-051979. ALTERNATE ID NUMBER CPP-E-1979. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda ...
FIRST FLOOR PLAN AND SCHEDULES. United Engineering Company Ltd., Alameda Shipyard, Ship Repair Facilities, Office Building. First floor plan, door transom schedule, interior finish schedule, sash schedule, exterior color schedule, and location plot plan. John Hudspeth, Architect, at foot of Main Street, Alameda, Calif. Sheet no. Al of 8 sheets, Plan no. 10,007. Scale 1/8 inch to the foot. March 18, 1942, last revised 9/25/43. U.S. Navy, Bureau of Yards & Docks, Contract no. bs 76. Approved for construction October 9, 1943. blueprint - United Engineering Company Shipyard, Office Building No. 137, 2900 Main Street, Alameda, Alameda County, CA
Burkert, Silke; Scholz, Urte; Gralla, Oliver; Roigas, Jan; Knoll, Nina
2011-09-01
In this study, we investigated the role of dyadic planning for health-behavior change. Dyadic planning refers to planning health-behavior change together with a partner. We assumed that dyadic planning would affect the implementation of regular pelvic-floor exercise (PFE), with other indicators of social exchange and self-regulation strategies serving as mediators. In a randomized-controlled trial at a German University Medical Center, 112 prostatectomy-patients with partners were randomly assigned to a dyadic PFE-planning condition or one of three active control conditions. Questionnaire data were assessed at multiple time points within six months post-surgery, measuring self-reported dyadic PFE-planning and pelvic-floor exercise as primary outcomes and social exchange (support, control) and a self-regulation strategy (action control) as mediating mechanisms. There were no specific intervention effects with regard to dyadic PFE-planning or pelvic-floor exercise, as two active control groups also showed increases in either of these variables. However, results suggested that patients instructed to plan dyadically still benefited from self-reported dyadic PFE-planning regarding pelvic-floor exercise. Cross-sectionally, received negative control from partners was negatively related with PFE only in control groups and individual action control mediated between self-reported dyadic PFE-planning and PFE for participants instructed to plan PFE dyadically. Longitudinally, action control mediated between self-reported dyadic PFE-planning and pelvic-floor exercise for all groups. Findings provide support for further investigation of dyadic planning in health-behavior change with short-term mediating effects of behavior-specific social exchange and long-term mediating effects of better self-regulation. Copyright © 2011 Elsevier Ltd. All rights reserved.
First Floor Plan U.S. Veterans Hospital, Jefferson Barracks, Therapeutic ...
First Floor Plan - U.S. Veterans Hospital, Jefferson Barracks, Therapeutic Exercise Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
MTRETR MAINTENANCE SHOP, TRA653. FLOOR PLAN FOR FIRST FLOOR: MACHINE ...
MTR-ETR MAINTENANCE SHOP, TRA-653. FLOOR PLAN FOR FIRST FLOOR: MACHINE SHOP, ELECTRICAL AND INSTRUMENT SHOP, TOOL CRIB, ELECTRONIC SHOP, LOCKER ROOM, SPECIAL TEMPERATURE CONTROLLED ROOM, AND OFFICES. "NEW" ON DRAWING REFERS TO REVISION OF 11/1956 DRAWING ON WHICH AREAS WERE DESIGNATED AS "FUTURE." HUMMEL HUMMEL & JONES 810-MTR-ETR-653-A-7, 5/1957. INL INDEX NO. 532-0653-00-381-101839, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
PUMP HOUSE FOR MTR WELL NO. 1, TRA601. FLOOR PLAN, ...
PUMP HOUSE FOR MTR WELL NO. 1, TRA-601. FLOOR PLAN, ELEVATIONS, SECTION SHOWING WELL CASING, ROOF FRAMING PLAN. AS BUILT. WELL HOUSE FOR WELL NO. 2, TRA-602, WAS IDENTICAL IN ALL PARTICULARS EXCEPT FLOOR DIMENSIONS AND ARRANGEMENT OF PUMP AND ELECTRICAL EQUIPMENT INSIDE. IDAHO OPERATIONS OFFICE MTR-601-IDO-1, 12/1954. INL INDEX NO. 531-0601-00-396-110463, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
5. Photographic copy of architectural floor plans for Officers' Quarters ...
5. Photographic copy of architectural floor plans for Officers' Quarters "A" & "B": Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. Muroc ESA 210-48 and 210-49, Military Construction: Muroc Flight Test Base, Muroc, California, Warehouses and Additional Housing for Officers: Officers Quarters, Floor Plan, Foundation Plan & Details, Sheet No. 12 of 16, May 1945. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Officers' Quarters A, North Base Road, Boron, Kern County, CA
2003-05-22
KENNEDY SPACE CENTER, FLA. - An overview of the Columbia debris hangar shows the orbiter outline on the floor with some of the 78,760 pieces identified to date. More than 82,500 pieces of shuttle debris have been rcovered.
18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND ...
18. FLOOR PLAN AND SECTION DRAWING OF POWERHOUSE FOUNDATION AND DRAFT TUBE Power House Plan and Sections, drawing E-965. Prepared by the Washington Water Power Company, December 27, 1922, revised January 5, 1926. - Enloe Dam, Power House, On Similkameen River, Oroville, Okanogan County, WA
7. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF OFFICE, SHEET 1 ...
7. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF OFFICE, SHEET 1 OF 1, 8' X 10' NEGATIVE MADE FROM COPIES OF ORIGINAL PLANS, MAY 21, 1913; WALLOWA-WHITMAN NATIONAL FOREST SUPERVISOR'S OFFICE, BAKER CITY, OREGON - Wallowa Ranger Station, Office, 602 First Street, Wallowa, Wallowa County, OR
HOT CELL BUILDING, TRA632. FIRST FLOOR FOUNDATION PLAN SHOWS SECTIONALIZED ...
HOT CELL BUILDING, TRA-632. FIRST FLOOR FOUNDATION PLAN SHOWS SECTIONALIZED FLOOR LOADINGS AND CONCRETE SLAB THICKNESSES, A TYPICAL FEATURE OF NUCLEAR ARCHITECTURE. IDAHO OPERATIONS OFFICE MTR-632-IDO-2, 11/1952. INL INDEX NO. 531-0632-62-396-110561, REV. 1. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Photocopy of floor plan of the C.B. & Q. R.R ...
Photocopy of floor plan of the C.B. & Q. R.R roundhouse and locomotive shops. June 1980. - Chicago, Burlington & Quincy Railroad, Roundhouse & Shops, Broadway & Spring Streets, Aurora, Kane County, IL
145. ELECTRONICS SHOP (BUILDING 60), FIRST FLOOR PLAN AND ELEVATION, ...
145. ELECTRONICS SHOP (BUILDING 60), FIRST FLOOR PLAN AND ELEVATION, CHARLES A. MAGUIRE, MARCH 25, 1952. PWD 10332. - Quonset Point Naval Air Station, Roger Williams Way, North Kingstown, Washington County, RI
5. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF GARAGE, SHEET 1 ...
5. ARCHITECTURAL ELEVATIONS AND FLOOR PLANS OF GARAGE, SHEET 1 OF 1, 8' X 10' NEGATIVE AND PRINT MADE FROM COPIES OF ORIGINAL PLANS, MAY 15, 1936, WALLOWA-WHITMAN NATIONAL FOREST SUPERVISOR'S, OFFICE, BAKER CITY, OREGON. - Wallowa Ranger Station, Garage, 602 First Street, Wallowa, Wallowa County, OR
5. ARCHITECTURAL ELEVATIONS AND FLOOR PLAN OF GAS HOUSE, SHEET ...
5. ARCHITECTURAL ELEVATIONS AND FLOOR PLAN OF GAS HOUSE, SHEET 1 OF 1, 8' X 10' NEGATIVE AND PRINT MADE FROM COPIES OF ORIGINAL PLANS, MAY 18, 1936, WALLOWA-WHITMAN NATIONAL FOREST SUPERVISOR'S, OFFICE, BAKER CITY, OREGON. - Wallowa Ranger Station, Gas House, 602 First Street, Wallowa, Wallowa County, OR
8. FLOOR PLANS OF FIRE EQUIPMENT BUILDING, SHEET 2 OF ...
8. FLOOR PLANS OF FIRE EQUIPMENT BUILDING, SHEET 2 OF 2, 8' X 10' NEGATIVE AND PRINT MADE FROM COPIES OF ORIGINAL PLANS, MAY 6, 1936, WALLOWA-WHITMAN NATIONAL FOREST SUPERVISOR'S OFFICE, BAKER CITY, OREGON. - Wallowa Ranger Station, Fire Equipment Building, 602 First Street, Wallowa, Wallowa County, OR
11. Historic American Buildings Survey Photocopy PRINCIPAL FLOOR PLAN, SOUTH ...
11. Historic American Buildings Survey Photocopy PRINCIPAL FLOOR PLAN, SOUTH SIDE ELEVATION ARCHITECT'S ORIGINAL PLAN Restricted: Not to be reproduced without written permission from Beinecke Rare Books Library, Yale University, New Haven, Connecticut - John Pitkin Norton House, 52 Hillhouse Avenue, New Haven, New Haven County, CT
18. Historic American Buildings Survey, 1932 measured drawing from old ...
18. Historic American Buildings Survey, 1932 measured drawing from old Philadelphia Survey, photocopy courtesy of the Free Library of Philadelphia BASEMENT FLOOR PLAN AND THIRD FLOOR PLAN. - Woodford, Philadelphia, Philadelphia County, PA
17. Historic American Buildings Survey, 1932 measured drawing from old ...
17. Historic American Buildings Survey, 1932 measured drawing from old Philadelphia Survey, photocopy courtesy of the Free Library of Philadelphia FIRST FLOOR PLAN AND SECOND FLOOR PLAN. - Woodford, Philadelphia, Philadelphia County, PA
18. Power plant engine piping floor plan, sheet 71 of ...
18. Power plant engine piping floor plan, sheet 71 of 130 - Naval Air Station Fallon, Power Plant, 800 Complex, off Carson Road near intersection of Pasture & Berney Roads, Fallon, Churchill County, NV
One Bedroom Units: Floor Plan, South Elevation (As Built), North ...
One Bedroom Units: Floor Plan, South Elevation (As Built), North Elevation (As Built), Section A-A (As Built), Section AA (Existing) - Aluminum City Terrace, East Hill Drive, New Kensington, Westmoreland County, PA
9. PHOTOCOPY, FOUNDATION AND FLOORING PLANS FOR ADMINISTRATION BUILDING. ...
9. PHOTOCOPY, FOUNDATION AND FLOORING PLANS FOR ADMINISTRATION BUILDING. - NIKE Missile Base SL-40, Administration Building, East central portion of base, southeast of Mess Hall, northeast of HIPAR Equipment Building, Hecker, Monroe County, IL
Photocopy of drawing (this photograph is an 8" x 10" ...
Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1990 original architectural drawing located at Building No. 458, NAS Pensacola, Florida) Quarters "4" as built floor plans, architectural floor plan (first floor), sheet 1 of 2 - U.S. Naval Air Station, Senior Officers' Quarters Q-4, Q-4 North Avenue, Pensacola, Escambia County, FL
Photocopy of drawing (this photograph is an 8" x 10" ...
Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1990 original architectural drawing located at Building No. 458, NAS Pensacola, Florida) Quarters "4" as built floor plans, architectural floor plan (second floor), sheet 2 of 2 - U.S. Naval Air Station, Senior Officers' Quarters Q-4, Q-4 North Avenue, Pensacola, Escambia County, FL
ESR dating of barite in sulphide deposits formed by the sea-floor hydrothermal activities.
Toyoda, Shin; Fujiwara, Taisei; Uchida, Ai; Ishibashi, Jun-ichiro; Nakai, Shun'ichi; Takamasa, Asako
2014-06-01
Barite is a mineral newly found to be practically useful for electron spin resonance (ESR) dating of sulphide deposits formed by the sea-floor hydrothermal activities. The recent studies for the properties of the ESR dating signal in barite are summarised in the present paper as well as the formulas for corrections for accurate dose-rate estimation are developed including the dose-rate conversion factors, shape correction for gamma-ray dose and decay of (226)Ra. Although development of the techniques for ESR dating of barite has been completed, further comparative studies with other dating techniques such as U-Th and (226)Ra-(210)Pb dating are necessary for the technique to be widely used. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.
57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 ...
57. Photocopy of Architectural Layout drawing, dated 25 June, 1993 by US Air Force Space Command. Original drawing property of United States Air Force, 21" Space Command. AL-3 PAVE PAWS SUPPORT SYSTEMS - CAPE COD AFB, MASSACHUSETTS - LAYOUT 1 FLOOR AND 1sr FLOOR ROOF. DRAWING NO. AL-3 - SHEET 4 OF 21. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
2. Photographic copy of photograph dated 1941; Gerald Young, Chicago, ...
2. Photographic copy of photograph dated 1941; Gerald Young, Chicago, photographer; Original in Rath collection at Grout Museum, Waterloo, Iowa; Filed under: Rath Parking Company, Box 5; REMOVING HIDES ON THE FLOOR IN OLD BEEF HOUSE; SHARPENED PRITCH STICKS SET INTO DEEP GROOVES ON THE FLOOR PLATES HELD CARCASSES IN POSITION FOR SKINNING - Rath Packing Company, Cooler Building-1929 Beef House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
19. SECOND FLOOR, CARDING MACHINE, BY 'CARDING SPECIALISTS, CO., LTD., ...
19. SECOND FLOOR, CARDING MACHINE, BY 'CARDING SPECIALISTS, CO., LTD., PELLON LAND WORKS, HALIFAX, ENGLAND, SN #M2983 14 (EST. DATE 1940'S+). - Bamberg Cotton Mill, Main Street, Bamberg, Bamberg County, SC
Second floor plan. (Also includes a roof plan and finish ...
Second floor plan. (Also includes a roof plan and finish schedule.) March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 13, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/13, Rev. "C"; file drawer 1290. Last revised 7 February 1984. Roof plan scale one-sixteenth inch to one foot; second floor plan scale one-eighth inch to one foot. 28.75x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Background Oriented Schlieren (BOS) of a Supersonic Aircraft in Flight
NASA Technical Reports Server (NTRS)
Heineck, James T.; Banks, Daniel W.; Schairer, Edward T.; Haering, Edward A.; Bean, Paul S.
2016-01-01
This article describes the development and use of Background Oriented Schlieren on a full-scale supersonic jet in flight. A series of flight tests was performed in October, 2014 and February 2015 using the flora of the desert floor in the Supersonic Flight Corridor on the Edwards Air Force Base as a background. Flight planning was designed based on the camera resolution, the mean size and color of the predominant plants, and the navigation and coordination of two aircraft. Software used to process the image data was improved with additional utilities. The planning proved to be effective and the vast majority of the passes of the target aircraft were successfully recorded. Results were obtained that are the most detailed schlieren imagery of an aircraft in flight to date.
Ground Floor Plan (Section A) U.S. Veterans Hospital, Jefferson ...
Ground Floor Plan (Section A) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
Ground Floor Plan (Section B) U.S. Veterans Hospital, Jefferson ...
Ground Floor Plan (Section B) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
First Floor Plan (Section A) U.S. Veterans Hospital, Jefferson ...
First Floor Plan (Section A) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
First Floor Plan (Section B) U.S. Veterans Hospital, Jefferson ...
First Floor Plan (Section B) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
Second Floor Plan (Section A) U.S. Veterans Hospital, Jefferson ...
Second Floor Plan (Section A) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
Second Floor Plan (Section B) U.S. Veterans Hospital, Jefferson ...
Second Floor Plan (Section B) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
FLOOR PLAN Dyess Air Force Base, Atlas F Missle ...
FLOOR PLAN - Dyess Air Force Base, Atlas F Missle Site S-8, Launch Control Center (LCC), Approximately 3 miles east of Winters, 500 feet southwest of Highway 17700, northwest of Launch Facility, Winters, Runnels County, TX
SECTION BB, FLOOR PLAN Dyess Air Force Base, Atlas ...
SECTION B-B, FLOOR PLAN - Dyess Air Force Base, Atlas F Missle Site S-8, Launch Facility, Approximately 3 miles east of Winters, 500 feet southwest of Highway 1770, center of complex, Winters, Runnels County, TX
Floor Plans Level 15 Load Platform, Level 17 Lower ...
Floor Plans - Level 15 Load Platform, Level 17 Lower Platform, Level 22 and Upper Platform, and Level 27 - Marshall Space Flight Center, Saturn V S-IC Static Test Facility, West Test Area, Huntsville, Madison County, AL
276. Photocopied July 1978. (QMC) FLOOR PLANS AND FRONT ELEVATION ...
276. Photocopied July 1978. (QMC) FLOOR PLANS AND FRONT ELEVATION OF THE QUINCY SCHOOL (C. 1895), SHOWING ADDITION TO ORIGINAL STRUCTURE, BUILT C. 1867. BURNED IN 1927. - Quincy Mining Company, Hancock, Houghton County, MI
9. BUILDING 65 ADDITION. LASER SAFETY TEAM. FLOOR PLAN, ELEVATIONS, ...
9. BUILDING 65 ADDITION. LASER SAFETY TEAM. FLOOR PLAN, ELEVATIONS, ETC. March 21, 1973 - Frankford Arsenal, Building No. 65, South of Tacony Street between Bridge Street & tracks of former Pennsylvania Railroad, Philadelphia, Philadelphia County, PA
Floor Plan, Axonometric View, Site Location Key, Cesar Chavez Fasting ...
Floor Plan, Axonometric View, Site Location Key, Cesar Chavez Fasting Room Diagram - Forty Acres, Tomasa Zapata Mireles Co-op Building , 30168 Garces Highway (Northwest Corner of Garces Highway and Mettler Avenue), Delano, Kern County, CA
24. VIEW OF THE SECOND FLOOR PLAN. ENRICHED URANIUM AND ...
24. VIEW OF THE SECOND FLOOR PLAN. ENRICHED URANIUM AND STAINLESS STEEL WEAPONS COMPONENT PRODUCTION-RELATED ACTIVITIES OCCURRED PRIMARILY ON THE SECOND FLOOR. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
Code of Federal Regulations, 2010 CFR
2010-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Mercury Vapor Measurement and Cell Room Monitoring Plans 5 Table 5 to Subpart IIIII of Part 63 Protection... Hazardous Air Pollutants: Mercury Emissions From Mercury Cell Chlor-Alkali Plants Pt. 63, Subpt. IIIII... and Cell Room Monitoring Plans Your Floor-Level Mercury Vapor Measurement Plan required by § 63.8192(d...
20. SECOND FLOOR, CARDING MACHINE, BY 'CARDING SPECIALISTS, CO., LTD., ...
20. SECOND FLOOR, CARDING MACHINE, BY 'CARDING SPECIALISTS, CO., LTD., PELLON LAND WORKS, HALIFAX, ENGLAND, SN #M2983 14 (EST. DATE 1940'S+), OPPOSITE END - Bamberg Cotton Mill, Main Street, Bamberg, Bamberg County, SC
Zhiyong Cai; Michael O. Hunt; Robert J. Ross; Lawrence A. Soltis
1999-01-01
To date, there is no standard method for evaluating the structural integrity of wood floor systems using nondestructive techniques. Current methods of examination and assessment are often subjective and therefore tend to yield imprecise or variable results. For this reason, estimates of allowable wood floor loads are often conservative. The assignment of conservatively...
8. Photocopy of Station Grounding drawing showing floor plans (from ...
8. Photocopy of Station Grounding drawing showing floor plans (from the BPA Engineering Vault, Drawing 005319, 3 May 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR
7. Photo copy of blue print, (original in Forest Service ...
7. Photo copy of blue print, (original in Forest Service Office, Elkins, WV), November 1933. FIRST FLOOR PLAN, SECOND FLOOR PLAN. - Parsons Nursery, Manager's Residence, South side of U.S. Route 219, Parsons, Tucker County, WV
8. PHOTOCOPY, ARCHITECTURAL FLOOR PLAN AND DETAIL DRAWING OF UNDERGROUND ...
8. PHOTOCOPY, ARCHITECTURAL FLOOR PLAN AND DETAIL DRAWING OF UNDERGROUND STORAGE MAGAZINES AND LAUNCHER-LOADER ASSEMBLIES. - NIKE Missile Base SL-40, Underground Storage Magazines & Launcher-Loader Assemblies, Southwesternmost end of launch area, Hecker, Monroe County, IL
Weather support area, floor plan and details. ("Alter COC, Bldg. ...
Weather support area, floor plan and details. ("Alter COC, Bldg. 2605, Weather Support Area, Floor Plan & Details" Also includes a site plan and a finish schedule. The exact location of this construction is obscure, but it appears to be the enclosure of space at the north end of room 101, the "Display Area" or "War Room") Strategic Air Command, Civil Engineering. Drawing no. B-1081, sheet no. 1 of 2, 9 July 1968; project no. MAR-132-8; CE-562; file drawer 2605-9, also 1315. Various scales. 29x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
... publication of the Commission's order approving the proposed Plan in the Federal Register. D. Development and..., Illinois 60605 (5) EDGA Exchange, Inc., 545 Washington Boulevard, Sixth Floor, Jersey City, NJ 07310 (6) EDGX Exchange, Inc., 545 Washington Boulevard, Sixth Floor, Jersey City, NJ 07310 (7) Financial...
58. SECTION AND DETAILS OF FOURTH AND FIFTH FLOOR ADDITIONS ...
58. SECTION AND DETAILS OF FOURTH AND FIFTH FLOOR ADDITIONS TO BUILDINGS NO. 2 AND 4, DATED JUNE 24, 1937; SCHMIDT, GARDEN AND ERICKSON, ARCHITECTS - Underwriters' Laboratories, 207-231 East Ohio Street, Chicago, Cook County, IL
13. Architectural First Floor Plan Buildings 185189 D, U.S. Atomic ...
13. Architectural First Floor Plan Buildings 185-189 D, U.S. Atomic Energy Commission, General Electric Company, Dwg. NO. H-1-11825, 1959. - D-Reactor Complex, Deaeration Plant-Refrigeration Buildings, Area 100-D, Richland, Benton County, WA
12. Architectural Floor Plans, 233S, U.S. Atomic Energy Commission, Hanford ...
12. Architectural Floor Plans, 233-S, U.S. Atomic Energy Commission, Hanford Atomic Products Operations, General Electric Company, Dwg. H-2-30464, 1956. - Reduction-Oxidation Complex, Plutonium Concentration Facility, 200 West Area, Richland, Benton County, WA
Photographic copy of floor plan, undated, Civil Engineers Office, in ...
Photographic copy of floor plan, undated, Civil Engineers Office, in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan - Selfridge Field, Building No. 833, West of Mulberry Street north of George Avenue, Mount Clemens, Macomb County, MI
10. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, ...
10. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, Courtesy, The Cosmos Club PROPOSED FLOOR PLANS, 2121 MASSACHUSETTS AVENUE, N.W., BLUEPRINT #11, THIRD FLOOR PLAN - Townsend House, 2121 Massachusetts Avenue Northwest, Washington, District of Columbia, DC
11. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, ...
11. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, Courtesy, The Cosmos Club PROPOSED FLOOR PLANS, 2121 MASSACHUSETTS AVENUE, N.W., BLUEPRINT #11, FOURTH FLOOR PLAN - Townsend House, 2121 Massachusetts Avenue Northwest, Washington, District of Columbia, DC
9. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, ...
9. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, Courtesy, The Cosmos Club PROPOSED FLOOR PLANS, 2121 MASSACHUSETTS AVENUE, N.W., BLUEPRING #11, SECOND FLOOR PLAN - Townsend House, 2121 Massachusetts Avenue Northwest, Washington, District of Columbia, DC
8. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, ...
8. Historic American Buildings Survey Photocopy of Unsigned, Undated Drawing, Courtesy, The Cosmos Club PROPOSED FLOOR PLANS, 2121 MASSACHUSETTS AVENUE, N.W., BLUEPRINT #11, FIRST-FLOOR PLAN - Townsend House, 2121 Massachusetts Avenue Northwest, Washington, District of Columbia, DC
ETR, TRA642 AND TRA647. FLOOR PLANS FOR FIRST AND SECOND ...
ETR, TRA-642 AND TRA-647. FLOOR PLANS FOR FIRST AND SECOND FLOORS OF THE OFFICE AND CONTROL BUILDING ALONG THE NORTH WALL OF THE ETR BUILDING. HEALTH PHYSICS, OPERATIONS, AND CONTROL ROOM. AIRLOCK DOOR. OFFICES. STAIRWAY LOCATIONS. KAISER ETR-5528-MTR-642-A-3, 10/1955. INL INDEX NO. 532-0642-00-100911, REV. 0. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
HOT CELL BUILDING, TRA632. FLOOR PLAN OF EXPANSION SHOWS LOCATION ...
HOT CELL BUILDING, TRA-632. FLOOR PLAN OF EXPANSION SHOWS LOCATION OF NEW CELLS, "HEAVY" CELL AT WEST END, "LIGHT" CELLS AT EAST. MOCK-UP AND STORAGE AREAS IN SOUTH HALF OF FLOOR. H.K. FERGUSON 895-MTR-ETR-632-A1, 12/1958. INL INDEX NO. 531-0632-00-279-101924, REV. 4. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
PROCESS WATER BUILDING, TRA605. FLOOR AND ROOF PLANS FOR SECOND ...
PROCESS WATER BUILDING, TRA-605. FLOOR AND ROOF PLANS FOR SECOND FLOOR. DETAILS OF CONCRETE ROOF SLABS. FLASH EVAPORATOR SUPPORTS AND PIPE OPENINGS TO TANKS BELOW. NOTE SPECIFIES THAT EQUIPMENT IS TO BE INSTALLED BEFORE ERECTION OF ROOF AND WALLS. BLAW-KNOX 3150-805-4, 1/1951. INL INDEX NO. 531-0605-62-098-100660, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Plan of the entresol (third floor) of the Masonic Temple, ...
Plan of the entresol (third floor) of the Masonic Temple, ca. 1872, showing the original layout of the Asylum of the Knights Templar and the original Grand Staircase ceiling design - Masonic Temple, 1 North Broad Street, Philadelphia, Philadelphia County, PA
37. Historic American Buildings Survey ORIGINAL DRAWING, SECOND FLOOR PLAN ...
37. Historic American Buildings Survey ORIGINAL DRAWING, SECOND FLOOR PLAN (FROM AN ORIGINAL IN THE OFFICE OF THE VICE PRESIDENT FOR DEVELOPMENT AND PHYSICAL PLANT, GEORGETOWN UNIVERSITY) - Georgetown University, Healy Building, Thirty-seventh & O Streets, Northwest, Washington, District of Columbia, DC
36. Historic American Buildings Survey ORIGINAL DRAWING, FIRST FLOOR PLAN ...
36. Historic American Buildings Survey ORIGINAL DRAWING, FIRST FLOOR PLAN (FROM AN ORIGINAL IN THE OFFICE OF THE VICE PRESIDENT FOR DEVELOPMENT AND PHYSICAL PLANT, GEORGETOWN UNIVERSITY) - Georgetown University, Healy Building, Thirty-seventh & O Streets, Northwest, Washington, District of Columbia, DC
38. Historic American Buildings Survey ORIGINAL DRAWING, THIRD FLOOR PLAN ...
38. Historic American Buildings Survey ORIGINAL DRAWING, THIRD FLOOR PLAN (FROM THE ORIGINAL IN THE FILES OF THE VICE PRESIDENT FOR DEVELOPMENT AND PHYSICAL PLANT, GEORGETOWN UNIVERSITY) - Georgetown University, Healy Building, Thirty-seventh & O Streets, Northwest, Washington, District of Columbia, DC
31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR ...
31. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS ACCESS CORRIDOR AT MEZZANINE AND LOWER LEVELS. INEEL DRAWING NUMBER 200-0633-00-287-106352. FLUOR NUMBER 5775-CPP-633-A-2. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP640). ...
ARCHITECTURAL FLOOR PLAN OF OPERATING AREA HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111678. ALTERNATE ID NUMBER 8952-CPP-640-A-1. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
14. FIRST FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., SHOWING ...
14. FIRST FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., SHOWING PROPOSED ALTERATION AND IMPROVEMENT OF DWELLING. No. 1343. SHEET 1 of 5. July 1899. - Monomoy Point Light Station, Approximately 3500 feet Northeast Powder Hole Pond, Monomoy National Wildlife Refuge, Chatham, Barnstable County, MA
15. SECOND FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., SHOWING ...
15. SECOND FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., SHOWING PROPOSED ALTERATION AND IMPROVEMENT OF DWELLING. No. 1343. SHEET 2 OF 5. July 1899. - Monomoy Point Light Station, Approximately 3500 feet Northeast Powder Hole Pond, Monomoy National Wildlife Refuge, Chatham, Barnstable County, MA
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA ...
43. FLOOR PLAN OF POWER HOUSE, EXHIBIT L, SANTA ANA RIVER NO. 2 PROJECT, APR. 30, 1945. SCE drawing no. 523643 (sheet no. 14; for filing with Federal Power Commission). - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA
Distribution of maple strip flooring in 1969
William C. Miller; William C. Miller
1971-01-01
This paper is the second in a series on the residential and commercial hardwood flooring industry. Unlike the first paper in the series, which dealt with oak strip flooring industry, this paper analyzes several qualitative questions pertaining to the maple flooring industry. The next paper planned for this series will analyze quantitative as well as qualitative...
de Tayrac, R; Haylen, B T; Deffieux, X; Hermieu, J F; Wagner, L; Amarenco, G; Labat, J J; Leroi, A M; Billecocq, S; Letouzey, V; Fatton, B
2016-03-01
Given its increasing complexity, the terminology for female pelvic floor disorders needs to be updated in addition to existing terminology of the lower urinary tract. To do this, it seems preferable to adopt a female-specific approach and build on a consensus based on clinical practice. This paper summarizes the work of the standardization and terminology committees of two international scientific societies, namely the International Urogynecological Association (IUGA) and the International Continence Society (ICS). These committees were assisted by many external expert referees. A ranking into relevant major clinical categories and sub-categories was developed in order to allocate an alphanumeric code to each definition. An extensive process of 15 internal and external reviews was set up to study each definition in detail, with decisions taken collectively (consensus). Terminology was developed for female pelvic floor disorders, bringing together more than 250 definitions. It is clinically based and the six most common diagnoses are defined. The emphasis was placed on clarity and user-friendliness to make this terminology accessible to practitioners and trainees in all the specialties involved in female pelvic floor disorders. Imaging investigations (ultrasound, radiology, MRI) exclusively for women have been added to the text, relevant figures have also been included to complete the text and help clarify the meaning. Regular reviews are planned and are also required to keep the document up-to-date and as widely acceptable as possible. The work conducted led to the development of a consensual terminology of female pelvic floor disorders. This document has been designed to provide substantial assistance in clinical practice and research. 4. Copyright © 2016 Elsevier Masson SAS. All rights reserved.
Floor vibration evaluations for medical facilities
NASA Astrophysics Data System (ADS)
Himmel, Chad N.
2003-10-01
The structural floor design for new medical facilities is often selected early in the design phase and in renovation projects, the floor structure already exists. Because the floor structure can often have an influence on the location of vibration sensitive medical equipment and facilities, it is becoming necessary to identify the best locations for equipment and facilities early in the design process. Even though specific criteria for vibration-sensitive uses and equipment may not always be available early in the design phase, it should be possible to determine compatible floor structures for planned vibration-sensitive uses by comparing conceptual layouts with generic floor vibration criteria. Relatively simple evaluations of planned uses and generic criteria, combined with on-site vibration and noise measurements early in design phase, can significantly reduce future design problems and expense. Concepts of evaluation procedures and analyses will be presented in this paper. Generic floor vibration criteria and appropriate parameters to control resonant floor vibration and noise will be discussed for typical medical facilities and medical research facilities. Physical, economic, and logistical limitations that affect implementation will be discussed through case studies.
61. Picking Floor, Large Pile of Waste Rock and Wood ...
61. Picking Floor, Large Pile of Waste Rock and Wood date unknown Historic Photograph, Photographer Unknown; Collection of William Everett, Jr. (Wilkes-Barre, PA), photocopy by Joseph E.B. Elliot - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA
26 CFR 48.6412-2 - Definitions for purposes of floor stocks credit or refund.
Code of Federal Regulations, 2010 CFR
2010-04-01
... dealer to a consumer before the inventory date and thereafter repossessed by the dealer, and articles... inventory date, but the consumer has physical possession of the article on that date, the article is not... the inventory date because the article is specifically identified with a contract, but on that date...
This photographic copy of an engineering drawing shows floor plans, ...
This photographic copy of an engineering drawing shows floor plans, sections and elevations of Building E-86, with details typical of the steel frame and "Transite" building construction at JPL Edwards Facility. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office: "Casting & Curing, Building E-86, Floor Plan, Elevations & Section," drawing no. E86/6, 25 February 1977. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Casting & Curing Building, Edwards Air Force Base, Boron, Kern County, CA
30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE ...
30. FLOOR PLANS OF WASTE CALCINATION FACILITY. SHOWS LEVELS ABOVE GRADE AND AT LEVEL OF OPERATING CORRIDOR. INEEL DRAWING NUMBER 200-0633-00-287-106351. FLUOR NUMBER 5775-CPP-633-A-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
ARCHITECTURAL FLOOR PLAN OF PROCESS AND ACCESS AREAS HOT PILOT ...
ARCHITECTURAL FLOOR PLAN OF PROCESS AND ACCESS AREAS HOT PILOT PLANT (CPP-640). INL DRAWING NUMBER 200-0640-00-279-111679. ALTERNATE ID NUMBER 8952-CPP-640-A-2. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
18. EXISTING FIRST FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., ...
18. EXISTING FIRST FLOOR PLAN. MONOMOY POINT LT. STATION, MASS., SHOWING PROPOSED ALTERATION AND IMPROVEMENT OF DWELLING. No. 1343. Sheet 5 of 5. July 1899. - Monomoy Point Light Station, Approximately 3500 feet Northeast Powder Hole Pond, Monomoy National Wildlife Refuge, Chatham, Barnstable County, MA
9. First floor plan,published in 'Architectural Record',Vol 31,No. 4, April ...
9. First floor plan,published in 'Architectural Record',Vol 31,No. 4, April 1912,p 356,courtesy of the Art Institute of Chicago,permission to duplicate courtesy of'Architectural Record' - Chicago City Hall, 121 North LaSalle Street, Chicago, Cook County, IL
10. Fifth floor plan,published in 'Architectural Record',Vol 31,No. 4, April ...
10. Fifth floor plan,published in 'Architectural Record',Vol 31,No. 4, April 1912,p. 356 (?),courtesy of Art Institute of Chicago, permission to duplicate courtesy of 'Architectural Record' - Chicago City Hall, 121 North LaSalle Street, Chicago, Cook County, IL
1. FLOOR PLANS (from sheet of drawings titled 'Alterations for ...
1. FLOOR PLANS (from sheet of drawings titled 'Alterations for Miss Alice Lee, San Diego California, 1911.' Original in the Art Galleries, University of California, Santa Barbara. Copied for the HABS Collection, 1975) - Alice Lee House, 3578 Seventh Avenue, San Diego, San Diego County, CA
7. Photographic copy of floor plan sketch, undated, Selfridge Air ...
7. Photographic copy of floor plan sketch, undated, Selfridge Air National Guard Base Civil Engineers Office in possession of Selfridge Base Civil Engineers Office, Mt. Clemens, Michigan. - Selfridge Field, Building No. 1514, Schoolhouse Road north of South Perimeter Road, Mount Clemens, Macomb County, MI
4. FLOOR PLAN AND SECTIONS, ADDITION TO POWER HOUSE. United ...
4. FLOOR PLAN AND SECTIONS, ADDITION TO POWER HOUSE. United Engineering Company Ltd., Alameda Shipyard. Also includes plot plan at 1 inch to 100 feet. John Hudspeth, architect, foot of Main Street, Alameda, California. Sheet 3. Plan no. 10,548. Scale 1/4 inch and h inch to the foot. April 30, 1945, last revised 6/22/45. pencil on vellum - United Engineering Company Shipyard, Boiler House, 2900 Main Street, Alameda, Alameda County, CA
7 CFR 993.107 - Floor inspection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 8 2010-01-01 2010-01-01 false Floor inspection. 993.107 Section 993.107 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... containers. Effective Date Note: At 70 FR 30613, May 27, 2005, § 993.107 was suspended indefinitely. ...
FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) SHOWING REMOTE ...
FIRST FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) SHOWING REMOTE ANALYTICAL LABORATORY, DECONTAMINATION ROOM, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-008-105065. ALTERNATE ID NUMBER 4272-14-102. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
6. 1859 sketch of the hospital's ground floor plan, before ...
6. 1859 sketch of the hospital's ground floor plan, before construction commenced in 1860. Photocopied from Report of the Board of Managers of the Hospital of the Protestant Episcopal Church, 1859 - Hospital of Protestant Episcopal Church in Philadelphia, Front Street & Lehigh Avenue, Philadelphia, Philadelphia County, PA
2003-05-22
KENNEDY SPACE CENTER, FLA. - An overview of the Columbia debris hangar shows the orbiter outline on the floor with some of the 78,760 pieces identified to date, as well as tables on the left that hold tiles. More than 82,500 pieces of shuttle debris have been rcovered.
7 CFR 993.505 - Floor inspection.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 8 2010-01-01 2010-01-01 false Floor inspection. 993.505 Section 993.505 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing Agreements... packing containers for later packaging. Effective Date Note: At 70 FR 30613, May 27, 2005, § 993.505 was...
GUARD HOUSE AND BARRACKS; SECOND FLOOR PLAN AND DOOR FRAME ...
GUARD HOUSE AND BARRACKS; SECOND FLOOR PLAN AND DOOR FRAME AND WINDOW DETAILS. Navy Department, Bureau of Yards & Docks, Navy Yard, Mar Island, CA. Albert F. Roller, Architect, San Francisco, CA. H.J. Brunnier, Structural Engineer, Sharon Building, San Francisco, CA. Sheet 2 of 15, accompanying specification Noy-4675. Submitted May 8, 1941, last revised July 14, 1941. Yards & Docks drawing no. 160687; P.W. (Public Works) drawing no. 10388-26; file no. 930-CR-4. Scale one eighth inch to one foot (floor plan) and 3 inches to one foot (details). 73 cm x 129 cm. Ink on vellum - Mare Island Naval Shipyard, Guard House & Barracks, Railroad Avenue near Eighteenth Street, Vallejo, Solano County, CA
26. Photographic copy of Second Floor Plan (The Ballinger Company, ...
26. Photographic copy of Second Floor Plan (The Ballinger Company, April 12, 1955), In files of the City of Philadelphia. Division of Aviation, Terminal E. Philadelphia International Airport. Reprinted with permission of Division of Aviation. - TWA Maintenance Hangar, South side of Tinicum Island Road, Philadelphia International Airport, Philadelphia, Philadelphia County, PA
25. Photographic copy of First Floor Plan (The Ballinger Company, ...
25. Photographic copy of First Floor Plan (The Ballinger Company, April 12, 1955). In files of the City of Philadelphia, Division of Aviation, Terminal E, Philadelphia International Airport. Reprinted with permission of the Division of Aviation. - TWA Maintenance Hangar, South side of Tinicum Island Road, Philadelphia International Airport, Philadelphia, Philadelphia County, PA
SAFETY AND SECURITY BUILDING, TRA614. FLOOR, ROOF, AND FOUNDATION PLANS. ...
SAFETY AND SECURITY BUILDING, TRA-614. FLOOR, ROOF, AND FOUNDATION PLANS. ROOM FUNCTIONS. DOOR AND ROOM FINISH SCHEDULE. BLAW-KNOX 3150-814-1, 3/1950. INL INDEX NO. 531-0614-00-098-100702, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Building Trades. Block III. Floor Framing.
ERIC Educational Resources Information Center
Texas A and M Univ., College Station. Vocational Instructional Services.
This document contains three units of a course on floor framing to be used as part of a building trades program. Each unit consists, first, of an informational lesson, with complete lesson plan for the teacher's use. Included in each lesson plan are the lesson aim; lists of teaching aids, materials, references, and prerequisites for students;…
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP601) BASEMENT SHOWING PROCESS ...
FLOOR PLAN OF MAIN PROCESSING BUILDING (CPP-601) BASEMENT SHOWING PROCESS CORRIDOR AND EIGHTEEN CELLS. TO LEFT IS LABORATORY BUILDING (CPP-602). INL DRAWING NUMBER 200-0601-00-706-051981. ALTERNATE ID NUMBER CPP-E-1981. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP627) WARM LABORATORY ...
SECOND FLOOR PLAN OF REMOTE ANALYTICAL FACILITY (CPP-627) WARM LABORATORY ROOM, DECONTAMINATION ROOM, HOT CHEMISTRY LABORATORY, AND MULTICURIE CELL ROOM. INL DRAWING NUMBER 200-0627-00-098-105066. ALTERNATE ID NUMBER 4272-14-103. - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID
A&M. Technical service laboratory in administration building (TAN602). Floor plan, ...
A&M. Technical service laboratory in administration building (TAN-602). Floor plan, reception desk, door and finish schedules. Ralph M. Parsons 1480-12-ANP/GE-3-602-A-1. INEEL index code no. 033-0602-00-693-107488 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Floor Plans Engine Removal Platform, Hold Down Arm Platform, ...
Floor Plans - Engine Removal Platform, Hold Down Arm Platform, Hydraulic Equipment Platforms, Isometric Cutaway of Engine Removal Platform, Isometric Cutaway of Hold Down Arm Platform, Isometric Cutaway of Hydraulic Platforms and Engine Support System Access - Marshall Space Flight Center, Saturn V S-IC Static Test Facility, West Test Area, Huntsville, Madison County, AL
FloorPlan. Courseware Evaluation for Vocational and Technical Education.
ERIC Educational Resources Information Center
Rosenfeld, Vila M.; And Others
This courseware evaluation rates the "FloorPlan" program developed by the Learning Seed. (The program--not included in this document--allows room design and arrangement to be performed on the computer screen.) The courseware was rated by a team of home economists participating in a network for the dissemination of courseware reviews.…
45. Master plan of 4th floor, building 1, U.S. Naval ...
45. Master plan of 4th floor, building 1, U.S. Naval supply activities, New York, Brooklyn, New York, public works department, March 2, 1953. Drawing #BK-S1-4. Scale 1/16=1. - U.S. Navy Fleet Supply Base, Storehouse No. 1, 830 Third Avenue, Brooklyn, Kings County, NY
Dose rate evaluation of workers on the operation floor in Fukushima-Daiichi Unit 3
NASA Astrophysics Data System (ADS)
Matsushita, Kaoru; Kurosawa, Masahiko; Shirai, Keisuke; Matsuoka, Ippei; Mukaida, Naoki
2017-09-01
At Fukushima Daiichi Nuclear Power Plant Unit 3, installation of a fuel handling machine is planned to support the removal of spent fuel. The dose rates at the workplace were calculated based on the source distribution measured using a collimator in order to confirm that the dose rates on the operation floor were within a manageable range. It was confirmed that the accuracy of the source distribution was C/M = 1.0-2.4. These dose rates were then used to plan the work on the operation floor.
77 FR 52737 - Ocean Transportation Intermediary License Revocations
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
..., Inc. Address: 462 7th Avenue, 14th Floor, New York, NY 10018. Date Revoked: July 21, 2012. Reason... Logistics. Address: 380 Magazine Avenue, Savannah, GA 31415. Date Revoked: August 9, 2012. Reason: Failed to...
NASA Astrophysics Data System (ADS)
Łuszczyńska, Katarzyna; Wistuba, Małgorzata; Malik, Ireneusz
2017-11-01
Intensive development of the area of Polish Carpathians increases the scale of landslide risk. Thus detecting landslide hazards and risks became important issue for spatial planning in the area. We applied dendrochronological methods and GIS analysis for better understanding of landslide activity and related hazards in the test area (3,75 km2): Salomonka valley and nearby slopes in the Beskid Żywiecki Mts., Outer Western Carpathians, southern Poland. We applied eccentricity index of radial growth of trees to date past landslide events. Dendrochronological results allowed us to determine the mean frequency of landsliding at each sampling point which were next interpolated into a map of landslide hazard. In total we took samples at 46 points. In each point we sampled 3 coniferous trees. Landslide hazard map shows a medium (23 sampling points) and low (20 sampling points) level of landslide activity for most of the area. The highest level of activity was recorded for the largest landslide. Results of the dendrochronological study suggest that all landslides reaching downslope to Salomonka valley floor are active. LiDAR-based analysis of relief shows that there is an active coupling between those landslides and river channel. Thus channel damming and formation of an episodic lake are probable. The hazard of flooding valley floor upstream of active landslides should be included in the local spatial planning system and crisis management system.
NASA Astrophysics Data System (ADS)
Preston, Sandra; Cianciolo, F.; Jones, T.; Wetzel, M.; Mace, K.; Barrick, R.; Kelton, P.; Cochran, A.; Johnson, R.
2007-05-01
Of the 100,000 visitors that come to McDonald Observatory each year, about half of them visit the Harlan J. Smith 2.7-m Telescope. Visitors experience the 2.7-m telescope as part of a guided tour, a self-guided tour, and during the once-a-month special viewing nights, that are unique to a telescope this size. Recent safety requirements limiting visitor access to the dome-floor level and a need to modernize out-of-date displays in the 2.7-m lobby area, motivated us to do this new exhibit. A planning team consisting of McDonald Observatory personnel from Outreach & Education, Physical Plant, and Administration came together via videoconferences (between Austin and Fort Davis) to develop an exhibit for the lobby area of this telescope. As the planning process unfolded, the team determined that a mix of static displays and modern technology such as flat panel displays and DVD video were key to presenting the history of the facility, introducing basic concepts about the telescope and current research, as well as giving virtual access to the dome floor for visitors on the self-guided tour. This approach also allows for content development and much of production to be done in-house, which was important from both a cost and maintenance standpoint. A representative of the Smith family was also consulted throughout the development of the exhibit to insure that the exhibit plan was seen as an acceptable memorial to the late director. The exhibit was installed in January 2007.
LPT. Shield test facility (TAN645 and 646). Floor plan and ...
LPT. Shield test facility (TAN-645 and -646). Floor plan and room names. Ralph M. Parsons 1229-17 ANP/GE-6-645-A-1. April 1957. Approved by INEEL Classification Office for public release. INEEL index code no. 037-0645/0646-00-693-107347 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
LPT. Guard House (TAN642). Elevations, floor plan, sections, details. Ralph ...
LPT. Guard House (TAN-642). Elevations, floor plan, sections, details. Ralph M. Parsons 1229-12 ANP/GE-7-642-A-S-H7V-1. November 1956. Approved by INEEL Classification Office for public release. INEEL index code no. 038-0642-00-693-107306 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
Plan of the principal (second) floor of James H. Windrim ...
Plan of the principal (second) floor of James H. Windrim and George Summerss competition design for the New Masonic Temple, Philadelphia, 1867. The exterior wall outline of the architects Early Norman alternative design is shown overlaid across the left third of the drawing. - Masonic Temple, 1 North Broad Street, Philadelphia, Philadelphia County, PA
MTR WING, TRA604. BASEMENT FLOOR PLAN. FIREPROOF RECORD ROOM BELOW ...
MTR WING, TRA-604. BASEMENT FLOOR PLAN. FIRE-PROOF RECORD ROOM BELOW COUNTING ROOM. HEATING AND COOLING EQUIPMENT. UNSPECIFIED EXPANSION AREA ALONG WEST WALL. BLAW-KNOX 3150-4-1, 7/1950. INL INDEX NO. 531-0604-00-098-100007, REV. 1. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted ...
41. 'Firing Pier, Second Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3867-46, Y&D Drawing 190841. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted ...
42. 'Firing Pier, Second Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3868-46, Y&D Drawing 190842. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted ...
36. 'Firing Pier, First Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3862-46, Y&D Drawing 190836. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
43. 'Firing Pier, Third and Fourth Floors and Roof Plan,' ...
43. 'Firing Pier, Third and Fourth Floors and Roof Plan,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3869-46, Y&D Drawing 190843. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted ...
38. 'Firing Pier, First Floor Plan, Section No. 3,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3864-46, Y&D Drawing 190838. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted ...
40. 'Firing Pier, Second Floor Plan, Section No. 1,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3866-46, Y&D Drawing 190840. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted ...
39. 'Firing Pier, First Floor Plan, Section No. 4,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3865-46, Y&D Drawing 190839. Scale 1/4' = 1'. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted ...
37. 'Firing Pier, First Floor Plan, Section No. 2,' submitted 29 December 1941 by John Brackett, Consulting Engineer, to Public Works Department, Bureau of Yards & Docks. PW Drawing 3863-46, Y&D Drawing 190837. Scale 1/4' = 1. - Naval Torpedo Station, Firing Pier, North end of Gould Island in Narragansett Bay, Newport, Newport County, RI
Front Elevation and Floor Plan in 1893, 1894, and 1909; ...
Front Elevation and Floor Plan in 1893, 1894, and 1909; Office End Elevation, Waiting End Elevation, Section A (1894), Section B (1894), Signage (ca. 1908-1911), Map of Rail Lines & Depots on Soldiers' Home - National Home for Disabled Volunteer Soldiers, Pacific Branch, Streetcar Depot, Corner of Pershing & Dewey Avenues, Los Angeles, Los Angeles County, CA
26 CFR 48.6412-1 - Floor stocks credit or refund.
Code of Federal Regulations, 2010 CFR
2010-04-01
...; and (D) The quantity of articles held by the dealer as floor stocks on the inventory date. (3) Actual... Revenue Code of 1954 with respect to the articles in my inventory on _____. (Name) By (Signature of... refund authorized by section 6412 for manufacturers excise taxes paid in respect of certain articles held...
Fritel, X; Fauconnier, A; de Tayrac, R; Amblard, J; Cotte, L; Fernandez, H
2008-09-01
Female urinary incontinence (UI) is a frequent affection that generates handicap and expenses. There is a link between UI and pregnancy; onset of UI during pregnancy is a risk factor for permanent UI. Postnatal pelvic floor exercise has shown efficacy to improve postnatal UI. However, it remains uncertain if benefits last more than few months. Publication of our rationale for prenatal pelvic floor exercise is an opportunity to expose our pre-specified hypotheses and help health professionals' awareness. The purpose of PreNatal Pelvic floor Prevention (3PN) is to compare the effects of prenatal pelvic floor exercise versus sole written instructions on UI one year after delivery. It is a multicenter, randomized, single blind study. Main inclusion criteria are first, single and non-complicated pregnancy over 18 years. Women randomized in pelvic floor exercise group will undergo eight sessions with a physiotherapist between six and eight months of pregnancy. Our principal criterion is UI score (International Consultation on Incontinence Questionnaire Short Form [ICIQ-SF]) one year after delivery. We plan to include 280 pregnant women in five centers over a 12-month screening period to show a one-point difference on UI score. ETHIC AND FINANCING: The study was approved by the IRB Comité de protection des personnes Sud-Ouest et Outre-Mer. It was registered by French Health Products Safety Agency (AFSSAPS) and Clinical Trials.gov. It is supported by the French Ministry of Health through the 2007 Hospital Plan for Clinical Research (PHRC). We plan to assess if prenatal pelvic floor exercise reduces postnatal medical consultations or physiotherapy sessions.
Equipment Location Plan, partial first floor plan. (Includes identification of ...
Equipment Location Plan, partial first floor plan. (Includes identification of each separate CPU, tape drive, hard drive, printer, keyboard, etc., within the data processing center in the southwest part of the first floor.) March Air Force Base, Riverside, California, Combat Operations Center, 465-L EDTCC/EDLCC. By International Electric Corporation, Paramus, New Jersey (3/5/62); for Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 85, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/85, Rev. "A"; file drawer 1290. Last revised 3 October 1966. Scale one-quarter inch to one foot. 28.75x40.5 inches. ink on linen - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
19. Photocopy of Drawing (November 1934 Architectural Drawings by Burge ...
19. Photocopy of Drawing (November 1934 Architectural Drawings by Burge and Stevens, in Possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FLOOR PLANS, TYPE 'A' APARTMENTS, FLOOR PLANS, TYPE 'B' APARTMENTS, KITCHEN ELEVATIONS, TECHWOOD PROJECT #1101, SHEET A-52. - Techwood Homes, Building No. 1, 575-579 Techwood Drive, Atlanta, Fulton County, GA
MTR WING, TRA604. FIRST FLOOR PLAN. ENTRY LOBBY, MACHINE SHOP, ...
MTR WING, TRA-604. FIRST FLOOR PLAN. ENTRY LOBBY, MACHINE SHOP, INSTRUMENT SHOP, COUNTING ROOM, HEALTH PHYSICS LAB, LABS AND OFFICES, STORAGE, SHIPPING AND RECEIVING. BLAW-KNOX 3150-4-2, 7/1950. INL INDEX NO. 053-604-00-099-100008, REV. 7. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Reducing Operating Costs by Optimizing Space in Facilities
2012-03-01
Base level 5 engineering units will provide facility floor plans, furniture layouts, and staffing documentation as necessary. One obstacle...due to the quantity and diverse locations. Base level engineering units provided facility floor plans, furniture layouts, and staffing documentation... furniture purchases and placement 5. Follow a quality systematic process in all decisions The per person costs can be better understood with a real
21. VIEW OF THE FIRST FLOOR PLAN. THE ORIGINAL DRAWING ...
21. VIEW OF THE FIRST FLOOR PLAN. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO
MTRETR MAINTENANCE SHOP, TRA653. FLOOR PLAN FOR MEZZANINE: LUNCH AND ...
MTR-ETR MAINTENANCE SHOP, TRA-653. FLOOR PLAN FOR MEZZANINE: LUNCH AND CONFERENCE ROOM, STORAGE AREA, OFFICES FOR FOREMEN, STENOS, ENGINEERS, DISPATCHER, WOMEN'S RESTROOM. HUMMEL HUMMEL & JONES 810-MTR-ETR-653-A-12, 2/1958. INL INDEX NO. 532-0653-00-381-102837, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
South elevation and main floor plan. San Bernardino Valley Union ...
South elevation and main floor plan. San Bernardino Valley Union Junior College, Science Building. Includes chemistry and botany departments. Howard E. Jones, Architect, San Bernardino, California. Sheet 2, job no. 311. Scale 1/8 inch to the foot. February 15, 1927. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
FAST CHOPPER DETECTOR HOUSE, TRA665. SECOND FLOOR ADDITION: PLAN, SECTIONS ...
FAST CHOPPER DETECTOR HOUSE, TRA-665. SECOND FLOOR ADDITION: PLAN, SECTIONS AND DETAILS AS ADDED TO THE EXISTING CHOPPER HOUSE IN 1962. F.C. TORKELSON 842-MTR-665-S-3, 4/1962. INL INDEX NO. 531-0665-60-851-150997, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
91. Photographic copy of drawing (16 February 1905, reproduction of ...
91. Photographic copy of drawing (16 February 1905, reproduction of original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Nimmons and Fellows. 1/16 inch to one foot. Plan dimensions are given on this floor plan of the first four bays of warehouse west of Homan Avenue. This drawing is excerpted from a blueprint set. FIRST FLOOR PLAN - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL
This photocopy of an engineering drawing shows the floor plan ...
This photocopy of an engineering drawing shows the floor plan of the Liner Lab, including room functions. Austin, Field & Fry, Architects Engineers, 22311 West Third Street, Los Angeles 57, California: Edwards Test Station Complex Phase II, Jet Propulsion Laboratory, California Institute of Technology, Edwards Air Force Base, Edwards, California: "Liner Laboratory, Floor Plan and Schedules," drawing no. E33/4-2, 26 June 1962. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California - Jet Propulsion Laboratory Edwards Facility, Liner Laboratory, Edwards Air Force Base, Boron, Kern County, CA
Magnetic resonance imaging of pelvic floor dysfunction.
Lalwani, Neeraj; Moshiri, Mariam; Lee, Jean H; Bhargava, Puneet; Dighe, Manjiri K
2013-11-01
Pelvic floor dysfunction is largely a complex problem of multiparous and postmenopausal women and is associated with pelvic floor or organ descent. Physical examination can underestimate the extent of the dysfunction and misdiagnose the disorders. Functional magnetic resonance (MR) imaging is emerging as a promising tool to evaluate the dynamics of the pelvic floor and use for surgical triage and operative planning. This article reviews the anatomy and pathology of pelvic floor dysfunction, typical imaging findings, and the current role of functional MR imaging. Copyright © 2013 Elsevier Inc. All rights reserved.
19. Photocopy of drawing, typical floor beam and stringer, Bridge ...
19. Photocopy of drawing, typical floor beam and stringer, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 23, 1895. Original on file with Metro North Commuter Railroad. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT
76 FR 26336 - Notice of Request for Approval of an Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
.... 5308--Clean Fuels Grant Program. DATES: Comments must be submitted before July 5, 2011. ADDRESSES: To...., Docket Operations, M-30, West Building, Ground Floor, Room W12- 140, Washington, DC 20590-0001. 4. Hand... Building, Ground Floor, Room W12-140, Washington, DC 20590-0001 between 9 a.m. and 5 p.m., Monday through...
28. Photocopy of 1921 architectural drawing titled: BUILDING 59, PATTERN ...
28. Photocopy of 1921 architectural drawing titled: BUILDING 59, PATTERN SHOP, PROPOSED EXTENSION SHOWING floor plans for the first and second floors, elevation detail of how the north extension would fit the existing building, and a plan view of site with adjacent buildings. Drawing No. 6167, File No. 651-23. - Puget Sound Naval Shipyard, Pattern Shop, Farragut Avenue, Bremerton, Kitsap County, WA
Instrumentation and control building, architectural, floor plans. Specifications no. Eng-04-353-55-72; Drawing No. 60-09-12' sheet 64 of 148; file no. 1321/15. Stamped: record drawing - as constructed. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Control Center, Test Area 1-115, near Altair & Saturn Boulevards, Boron, Kern County, CA
ETR HEAT EXCHANGER BUILDING, TRA644. FLOOR PLAN AND SECTIONS. PUMP ...
ETR HEAT EXCHANGER BUILDING, TRA-644. FLOOR PLAN AND SECTIONS. PUMP CUBICLES WITH PUMP MOTORS OUTSIDE CUBICLES. HEAT EXCHANGER EQUIPMENT. COOLANT PIPE TUNNEL ENTERS FROM REACTOR BUILDING. KAISER ETR-5582-MTR-644-A-3, 2/1956. INL INDEX NO. 532-0644-00-486-101294, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
LPT. Shield test facility (TAN646). Floor plan for water treatment ...
LPT. Shield test facility (TAN-646). Floor plan for water treatment room on west facade, tank and filter locations in basement along service tunnel and in coupling station. Ralph M. Parsons 1229-17 ANP/GE-6-646-P-2. April 1957. INEEL Index code no. 037-0645/0646-51-693-107387 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
MTR, TRA603. SECOND FLOOR PLAN. OFFICES AND INSTRUMENT ROOM. STEEL ...
MTR, TRA-603. SECOND FLOOR PLAN. OFFICES AND INSTRUMENT ROOM. STEEL PARTITIONS ON EAST SIDE OF INSTRUMENT ROOM. DETAIL OF COLUMN ENCASEMENTS. STAIRWAYS IN NORTH AND SOUTH CORNERS. PASSENGER ELEVATION. BLAW-KNOX 3150-803-3, 7/1950. INL INDEX NO. 531-0603-00-098-100562, REV. 6. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
22. VIEW OF THE BASEMENT FLOOR PLAN. THE BASEMENT TUNNELS ...
22. VIEW OF THE BASEMENT FLOOR PLAN. THE BASEMENT TUNNELS WERE DESIGNED AS FALLOUT SHELTERS AND USED FOR STORAGE. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, General Manufacturing, Support, Records-Central Computing, Southern portion of Plant, Golden, Jefferson County, CO
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-03
... Rule Violation Plan. Background Effective October 1, 2008, NYSE Euronext, acquired the parent company... Floor, or use an Exchange issued and authorized portable phone, to communicate with non- members off the... authorized portable phone may communicate directly from the point of sale on the Floor with someone off-Floor...
Whitford, Heather M; Jones, Martyn
2011-11-01
To investigate the motivation of pregnant women towards the practice of pelvic floor exercises during pregnancy using the revised Theory of Planned Behaviour (RTPB), incorporating measures of past behaviour. Longitudinal cohort study. Women (n= 289) attending antenatal clinics in the North-East of Scotland were interviewed in the third trimester of pregnancy regarding their practice of pelvic floor exercises. Beliefs and attitudes about the exercises were investigated by self-administered questionnaire using the RTPB as a framework. A follow-up postal questionnaire was sent between 6 and 12 months after delivery. TPB variables (attitude, subjective norm, and self-efficacy) explained 53.1% of the variance in intention to practise pelvic floor exercises during pregnancy. Perceived vulnerability to incontinence (attitude to the current behaviour) had no relationship with intention. Measures of past behaviour significantly improved the percentage of explained variance in intention. Confidence in ability to perform pelvic floor exercises correctly (self-efficacy) reliably predicted subsequent practice. Future compliance with pelvic floor exercises may be enhanced by effective instruction to enhance confidence in ability to contract the correct muscles and promotion of measures to help establish a habit of exercising the pelvic floor muscles. ©2011 The British Psychological Society.
Optimization of Typological Requirements for Low-Cost Detached Houses
NASA Astrophysics Data System (ADS)
Kuráň, Jozef
2017-09-01
The presented paper deals with an analysis of the legislative, hygienic, functional and operational requirements for the design of detached houses and individual dwellings in terms of typological requirements. The article also presents a sociological survey about the preferences and subjective requirements of relevant public group segments in terms of living in a detached house or an individual dwelling. The aim of the paper is to define the possibilities for the optimization of typological requirements. The optimization methods are based on principles already applied to contemporary detached house preferences and trends. The main idea is to reduce the amount of floor space, thus lowering construction and operating costs. The goal is to design an optimized floor plan, while preserving the hygienic criteria for individual residential dwellings. By applying optimization methods, a so-called rationalized and conditioned floor plan results in an individual dwelling floor plan design that can be compared to a reference model with an accurate quantification comparison. The significant sources of research are the legislative and normative requirements in the field of house construction in Slovakia, the Czech Republic and abroad.
Structure-borne sound from magnetic resonance imaging systems
NASA Astrophysics Data System (ADS)
Ungar, Eric E.; Zapfe, Jeffrey A.
2003-10-01
Magnetic resonance imaging (MRI) systems are known to produce a considerable amount of audible noise. The recent tendency to install such systems on above-grade floors has led to increasing concerns about structure-borne noise transmission from the MRI to adjacent occupied areas. This paper presents the results of a study in which structure-borne noise forces produced by two operational MRI systems were determined via measurement of the floor vibrations induced by the systems and of the impedance of their supporting floors. Forces with known spectra were applied to the floors of planned MRI suites in a hospital extension and the corresponding noise in adjacent areas was measured. Similarly, airborne noise was introduced in the planned suites and the related noise in adjacent areas was measured. The results then were scaled to correspond to the measured MRI forces and airborne noise. It was found that in areas below the planned MRI installations structure-borne noise would predominate, unless it is mitigated. Structure-borne noise isolation of MRI systems, whose environments must meet stringent vibration criteria, is discussed briefly.
is limited. Check the calendar for dates and registration. Visitors meet in the Wilson Hall atrium and making your way to the 1st floor of Wilson Hall in time for the tour. Fermilab is a busy lab so Fermilab's exhibit and viewing areas on the 15th floor of Wilson Hall are open Monday-Friday from 8 a.m. to 4
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-15
... (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200 New Jersey...-0109'' in the ``Keyword'' box. Click ``Search'' then click on the balloon shape in the ``Actions...'' column. You may also visit the Docket Management Facility in Room W12-140 on the ground floor of the...
A new technology for manufacturing scheduling derived from space system operations
NASA Technical Reports Server (NTRS)
Hornstein, R. S.; Willoughby, J. K.
1993-01-01
A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.
8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ...
8. "TEST STAND, ARCHITECTURAL, FLOOR PLANS AND SCHEDULES." Specifications No. ENG-04-353-55-72; Drawing No. 60-0912; sheet 22 of 148; file no. 1320/73. Stamped: RECORD DRAWING - AS CONSTRUCTED. Below stamp: Contract no. 4338, no change. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A Terminal Room, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
22. VIEW OF THE BASEMENT AND MEZZANINE FLOOR PLANS. ALL ...
22. VIEW OF THE BASEMENT AND MEZZANINE FLOOR PLANS. ALL MECHANICAL AND ELECTRICAL UTILITY EQUIPMENT IS CONTAINED IN THE BASEMENT. THE MEZZANINE CONTAINS OFFICES. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO
ERIC Educational Resources Information Center
Asphalt and Vinyl Asbestos Tile Inst., New York, NY.
The claim is made that proper planning and modest outlays of time, labor, and material costs can provide and maintain a high appearance level for floors in institutional, commercial, and industrial buildings. Instructions for four basic steps in maintaining the good looks of vinyl asbestos and asphalt tile floors are treated in the booklet--(1)…
17. Truss suspended column, industrial loft building, looking at southeast ...
17. Truss suspended column, industrial loft building, looking at southeast corner. Note open floor plan as a result of the floor beams being suspended from above. - Dry Dock Engine Works, 1801 Atwater Street, Detroit, MI
76 FR 67152 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings DATES: Time and Date: 10 a.m., Friday, November 25, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. Matters To Be Considered Surveillance and Enforcement Matters. In the event that the times or...
Repair Air Conditioning, COC Bldg 2605, First Floor Plan. By ...
Repair Air Conditioning, COC Bldg 2605, First Floor Plan. By Strategic Air Command, Civil Engineering. Drawing no. R-156, sheet no. 2 of 4, 15 August 1968; project no. MAR-125-8;CE-572; file drawer 2605-6. Scale one-eighth inch to one foot. 29x41 inches. pencil on paper 405 - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
LPT. Low power test (TAN640 and 641) floor plan. Cells ...
LPT. Low power test (TAN-640 and -641) floor plan. Cells 101 and 102, control rooms, shielded counting room, generator room, list of room numbers and names. Door details. Ralph M. Parsons 1229-12 ANP/GE-7-640-A-1. November 1956. Approved by INEEL Classification Office for public release. INEEL index code no. 038-0640-00-693-107274 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
North elevation and second floor plan. San Bernardino Valley Union ...
North elevation and second floor plan. San Bernardino Valley Union Junior College, Science Building. Includes physics, geology, and zoology departments shelving. Howard E. Jones, Architect, San Bernardino, California. Sheet 4, job no. 311. Scales 1/8 inch to the foot (elevations) and 1/2 inch to the foot (shelving). February 15, 1927. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA
PROCESS WATER BUILDING, TRA605. FLOOR PLAN AND SECTION OF FLASH ...
PROCESS WATER BUILDING, TRA-605. FLOOR PLAN AND SECTION OF FLASH EVAPORATOR ROOM SHOWING ITS LOCATION ABOVE THE SEAL AND SUMP TANKS. PIPING TAKES WATER FROM SEAL TANK UPWARD TO FLASH EVAPORATORS AND THEN BACK DOWN TO SUMP TANK. BLAW-KNOX 3150-5-6, 8/1950. INL INDEX NO. 531-605-00-098-100011, REV. 3. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Creating Library Interiors: Planning and Design Considerations.
ERIC Educational Resources Information Center
Jones, Plummer Alston, Jr.; Barton, Phillip K.
1997-01-01
Examines design considerations for public library interiors: access; acoustical treatment; assignable and nonassignable space; building interiors: ceilings, clocks, color, control, drinking fountains; exhibit space: slotwall display, floor coverings, floor loading, furniture, lighting, mechanical systems, public address, copying machines,…
Photographic copy of floor plans for Bachelor Officers' Quarters (Tl) ...
Photographic copy of floor plans for Bachelor Officers' Quarters (T-l) known as the "Desert Rat Hotel" in the early days of the Muroc Flight Test Base (North Base). The plans show the layout of quarters, lavatories, mess as well as, the cooling system installation. Contract W-509-Eng 2937, Military Construction; Muroc Bombing Range, Muroc Lake, Calif; Materiel Test Site, Officers Quarters, Evaporative Coolers, Sheet 5 of 11, May 1942. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Bachelor Officers' Quarters T-1, Second & C Streets, Boron, Kern County, CA
3. Photograph of a line drawing. SHEET 3, FLOOR PLAN, ...
3. Photograph of a line drawing. SHEET 3, FLOOR PLAN, DETAILS OF S EAST AND S WEST CORNERS, TYPICAL DETAIL AT COLUMN U-49 and U-25, TYPICAL SECTION THRU R. R. TRACK IN S WEST CORNER, SECTION THRU PIPE PIT AT COLUMN #P-1; 9-16-1940. Assembly Building for Tank Plant for the Chrysler Corporation, Macomb County, Michigan. Delineator: H. C. B. - Detroit Arsenal, 6501 East Eleven Mile Road, Warren, Macomb County, MI
Constructing an Indoor Floor Plan Using Crowdsourcing Based on Magnetic Fingerprinting
Zhao, Fang; Jiang, Mengling; Ma, Hao; Zhang, Yuexia
2017-01-01
A large number of indoor positioning systems have recently been developed to cater for various location-based services. Indoor maps are a prerequisite of such indoor positioning systems; however, indoor maps are currently non-existent for most indoor environments. Construction of an indoor map by external experts excludes quick deployment and prevents widespread utilization of indoor localization systems. Here, we propose an algorithm for the automatic construction of an indoor floor plan, together with a magnetic fingerprint map of unmapped buildings using crowdsourced smartphone data. For floor plan construction, our system combines the use of dead reckoning technology, an observation model with geomagnetic signals, and trajectory fusion based on an affinity propagation algorithm. To obtain the indoor paths, the magnetic trajectory data obtained through crowdsourcing were first clustered using dynamic time warping similarity criteria. The trajectories were inferred from odometry tracing, and those belonging to the same cluster in the magnetic trajectory domain were then fused. Fusing these data effectively eliminates the inherent tracking errors originating from noisy sensors; as a result, we obtained highly accurate indoor paths. One advantage of our system is that no additional hardware such as a laser rangefinder or wheel encoder is required. Experimental results demonstrate that our proposed algorithm successfully constructs indoor floor plans with 0.48 m accuracy, which could benefit location-based services which lack indoor maps. PMID:29156639
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pool, Karl N.; Minette, Michael J.; Wahl, Jon H.
On September 28, 2015, debris collected from the PRF (236-Z) canyon floor, Pan J, was observed to exhibit chemical reaction. The material had been transferred from the floor pan to a collection tray inside the canyon the previous Friday. Work in the canyon was stopped to allow Industrial Hygiene to perform monitoring of the material reaction. Canyon floor debris that had been sealed out was sequestered at the facility, a recovery plan was developed, and drum inspections were initiated to verify no additional reactions had occurred. On October 13, in-process drums containing other Pan J material were inspected and showedmore » some indication of chemical reaction, limited to discoloration and degradation of inner plastic bags. All Pan J material was sealed back into the canyon and returned to collection trays. Based on the high airborne levels in the canyon during physical debris removal, ETGS (Encapsulation Technology Glycerin Solution) was used as a fogging/lock-down agent. On October 15, subject matter experts confirmed a reaction had occurred between nitrates (both Plutonium Nitrate and Aluminum Nitrate Nonahydrate (ANN) are present) in the Pan J material and the ETGS fixative used to lower airborne radioactivity levels during debris removal. Management stopped the use of fogging/lock-down agents containing glycerin on bulk materials, declared a Management Concern, and initiated the Potential Inadequacy in the Safety Analysis determination process. Additional drum inspections and laboratory analysis of both reacted and unreacted material are planned. This report compiles the results of many different sample analyses conducted by the Pacific Northwest National Laboratory on samples collected from the Plutonium Reclamation Facility (PRF) floor pans by the CH2MHill’s Plateau Remediation Company (CHPRC). Revision 1 added Appendix G that reports the results of the Gas Generation Rate and methodology. The scope of analyses requested by CHPRC includes the determination of common anions, gamma spectrometry, metals, corrosivity, organics and alpha spectrometry (note: alpha spectrometry was cancelled during the performance of this work with concurrence from CHPRC). Results may help elucidate the components that led to the unexpected reaction in the canyon as well as inform the radiological and hazardous characteristics. The specific anions, gamma emitters, organics and metals requested by CHPRC are provided in the analytical reports sections. The individual analyses were conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.) developed by PNNL specifically for this project. The final reports for each analysis set are included in this compilation of the results. Each package was reviewed under the PFP Floor Pan Evaluation Project Quality Assurance Project Plan so no additional reviews were conducted in this compilation task. The Gas Generation Rates in Appendix G were conducted under the PNNL “How Do I…” quality assurance program and were NOT conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.).« less
77 FR 1072 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
... FEDERAL ELECTION COMMISSION Sunshine Act Notice AGENCY: Federal Election Commission. DATES: Date and Time: Thursday, January 12, 2012 at 10 a.m. Place: 999 E Street NW., Washington, DC (Ninth Floor) Status: This Meeting will be Open to the Public. Items to be Discussed: Correction and Approval of the Minutes for the Meeting of December 15, 2011....
MTR, TRA603. FIRST FLOOR PLAN. REACTOR AT CENTER. TWENTYMETER CHOPPER ...
MTR, TRA-603. FIRST FLOOR PLAN. REACTOR AT CENTER. TWENTY-METER CHOPPER HOUSE. COFFIN TURNING ROLLS. REMOVABLE PANEL OVER CANAL ON EAST SIDE. NEW PLUG STORAGE ACCESS. DOOR SCHEDULE INDICATES STEEL (FOR VAULT), WIRE MESH, AND HOLLOW METAL TYPES. STORAGE AND ISSUE ROOM. SAFETY SHOWERS. DOORWAY TO WING, TRA-604. BLAW-KNOX 3150-803-2, 7/1950. INL INDEX NO. 531-0603-00-098-100561, REV. 10. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
20. VIEW OF THE BASEMENT FLOOR PLAN. THE BASEMENT AREA ...
20. VIEW OF THE BASEMENT FLOOR PLAN. THE BASEMENT AREA INCLUDES A UTILITY ROOM, PROCESS WASTE STORAGE AND MAINTENANCE AREAS, AND THE ENTRANCE TO AN UNDERGROUND TUNNEL LEADING TO BUILDING 881. THE ORIGINAL DRAWING HAS BEEN ARCHIVED ON MICROFILM. THE DRAWING WAS REPRODUCED AT THE BEST QUALITY POSSIBLE. LETTERS AND NUMBERS IN THE CIRCLES INDICATE FOOTER AND/OR COLUMN LOCATIONS. - Rocky Flats Plant, Uranium Rolling & Forming Operations, Southeast section of plant, southeast quadrant of intersection of Central Avenue & Eighth Street, Golden, Jefferson County, CO
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing detail of floor beam at central pier, half section of cantilever slab at end of bridge, floor beam end panels, slab reinforcing, plan of slab reinforcing, diagram of slab bars, typical floor girder. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
55. Photograph of Original Plan (original plans in the possession ...
55. Photograph of Original Plan (original plans in the possession of the Los Angeles Union Passenger Terminal Corporation) BAGGAGE AND EXPRESS UNITY, STREET LEVEL FLOOR PLAN, SECTION III - Los Angeles Union Passenger Terminal, Tracks & Shed, 800 North Alameda Street, Los Angeles, Los Angeles County, CA
ERIC Educational Resources Information Center
Knuffman, Susan M.
1997-01-01
Explores ways of maintaining school floors and carpeting that ensure students and staff are comfortable, safe, and healthy. Carpet maintenance for high- to low-traffic areas and cleaning procedures are examined, as are ways maintenance staff can work together to help ensure a successful flooring-maintenance plan. (GR)
Archaeomagnetic studies in central Mexico—dating of Mesoamerican lime-plasters
NASA Astrophysics Data System (ADS)
Hueda-Tanabe, Y.; Soler-Arechalde, A. M.; Urrutia-Fucugauchi, J.; Barba, L.; Manzanilla, L.; Rebolledo-Vieyra, M.; Goguitchaichvili, A.
2004-11-01
For the first time results of an archaeomagnetic study of unburned lime-plasters from Teotihuacan and Tenochtitlan in central Mesoamerica are presented. Plasters made of lime, lithic clasts and water, appear during the Formative Period and were used for a variety of purposes in floors, sculptures, ceramics and supporting media for mural paintings in the Oaxaca and Maya area. In Central Mexico, grinded volcanic scoria rich in iron minerals is incorporated into the lime-plasters mixture. Samples were selected from two archaeological excavation projects in the Teopancazco residential compound of Teotihuacan and the large multi-stage structure of Templo Mayor in Tenochtitlan, where chronological information is available. The intensity of remanent magnetization (natural remanent magnetization (NRM)) and low-field susceptibility are weak reflecting low relative content of magnetic minerals. NRM directions are well grouped and alternating field demagnetization shows single or two-component magnetizations. Rockmagnetic experiments point to fine-grained titanomagnetites with pseudo-single domain behavior. Anisotropy of magnetic susceptibility (AMS) measurements document a depositional fabric, with normal to free-surface minimum AMS axes. Characteristic mean site directions were correlated to the paleosecular variation curve for Mesoamerica. Data from Templo Mayor reflect recent tilting of the structures. Teopancazco mean site declinations show good correspondence with the reference curve, in agreement with the radiocarbon dating. Dates for four stages of Teotihuacan occupancy based on the study of lime-plasters range from AD 350 to 550. A date for a possible Mazapa occupation around AD 850 or 950 is also suggested based on the archaeomagnetic correlation. The archaeomagnetic record of a plaster floor in Teopancazco differed from the other nearby sites pointing to a thermoremanent magnetization; comparison with the reference curve suggests dates around AD 1375 or 1415. The burning of the stucco floor likely occurred during a late re-occupation of the site by the Aztecs. Our results suggest that archaeomagnetic dating can be applied to lime-plasters, which are materials widely employed in Mesoamerica.
Human Factors In the Joint Typhoon Warning Center Watch Floor
2012-11-01
Report 3. DATES COVERED (From-To) 01-10-2010 – 30-03-2011 4. TITLE AND SUBTITLE Human Factors in the Joint Typhoon Warning Center Watch Floor...between users’ information requirements and interpretation process and the JTWC’s forecast fields. The language of TCCOR definitions provides one (of...direction error is less than 90°, predicting a position 10 nautical miles (nmi) too close to the current position produces a lower FTE than
TEAM (Technologies Enabling Agile Manufacturing) shop floor control requirements guide: Version 1.0
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-03-28
TEAM will create a shop floor control system (SFC) to link the pre-production planning to shop floor execution. SFC must meet the requirements of a multi-facility corporation, where control must be maintained between co-located facilities down to individual workstations within each facility. SFC must also meet the requirements of a small corporation, where there may only be one small facility. A hierarchical architecture is required to meet these diverse needs. The hierarchy contains the following levels: Enterprise, Factory, Cell, Station, and Equipment. SFC is focused on the top three levels. Each level of the hierarchy is divided into three basicmore » functions: Scheduler, Dispatcher, and Monitor. The requirements of each function depend on the hierarchical level in which it is to be used. For example, the scheduler at the Enterprise level must allocate production to individual factories and assign due-dates; the scheduler at the Cell level must provide detailed start and stop times of individual operations. Finally the system shall have the following features: distributed and open-architecture. Open architecture software is required in order that the appropriate technology be used at each level of the SFC hierarchy, and even at different instances within the same hierarchical level (for example, Factory A uses discrete-event simulation scheduling software, and Factory B uses an optimization-based scheduler). A distributed implementation is required to reduce the computational burden of the overall system, and allow for localized control. A distributed, open-architecture implementation will also require standards for communication between hierarchical levels.« less
36 CFR 910.60 - Gross floor area.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Gross floor area. 910.60 Section 910.60 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION GENERAL GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE...
36 CFR 910.60 - Gross floor area.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Gross floor area. 910.60 Section 910.60 Parks, Forests, and Public Property PENNSYLVANIA AVENUE DEVELOPMENT CORPORATION GENERAL GUIDELINES AND UNIFORM STANDARDS FOR URBAN PLANNING AND DESIGN OF DEVELOPMENT WITHIN THE PENNSYLVANIA AVENUE...
Oblasser, Claudia; Christie, Janice; McCourt, Christine
2015-04-01
To identify, critically appraise and synthesize the best current evidence on the use of vaginal cones or balls to improve pelvic floor muscle performance and urinary continence in women post partum. The vaginal use of cones or balls is a pelvic floor muscle training method that aims to enhance muscle performance and thereby prevent or treat urinary incontinence. Nonetheless to date, no systematic review has focused on the effectiveness of these devices specifically during the postpartum period. Quantitative systematic review with potential meta-analysis. The review will be undertaken by searching 14 scientific databases (including PubMed and CINAHL, without date restriction) and the world-wide web; experts will also be contacted for published and unpublished data. Included studies must be randomized or quasi-randomized trials and have female participants until 1 year after childbirth. The intervention will be compared with no treatment, placebo, sham treatment or active controls. Outcome measures will relate to pelvic floor muscle performance or urinary incontinence. Studies will be selected, 'risk of bias' assessed and data extracted by two reviewers independently. Following inter-reviewer agreement of included studies, data will be checked after entry into systematic review processing software. If appropriate, data will be synthesized by meta-analysis; if this is not possible, a narrative review only will be undertaken. The information gained from this systematic review will help midwives, nurses, other health professionals and women after childbirth decide how to promote female pelvic floor health and in defining further areas of study. © 2014 John Wiley & Sons Ltd.
Toward Autonomous Multi-floor Exploration: Ascending Stairway Localization and Modeling
2013-03-01
robots have traditionally been restricted to single floors of a building or outdoor areas free of abrupt elevation changes such as curbs and stairs ...solution to this problem and is motivated by the rich potential of an autonomous ground robot that can climb stairs while exploring a multi-floor...parameters of the stairways, the robot could plan a path that traverses the stairs in order to explore the frontier at other elevations that were previously
Exterior building details of Building C, east façade: inscribed date ...
Exterior building details of Building C, east façade: inscribed date panel "hospital 1885", corbelled brick belt course, parapet, second floor historic four-over-four window with brick lintels, quoins and decorative metal grilled, cantilever wooden walkway; westerly view - San Quentin State Prison, Building 22, Point San Quentin, San Quentin, Marin County, CA
29. Photographic copy of original design drawing, dated January 1970, ...
29. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Interior elevations, fourth floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
27. Photographic copy of original design drawing, dated January 1970, ...
27. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Interior elevations, third floor - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
24 CFR 3280.109 - Room requirements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DEVELOPMENT MANUFACTURED HOME CONSTRUCTION AND SAFETY STANDARDS Planning Considerations § 3280.109 Room requirements. (a) Every manufactured home shall have at least one living area with not less than 150 sq. ft. of gross floor area. (b) Rooms designed for sleeping purposes shall have a minimum gross square foot floor...
Materials for School Construction.
ERIC Educational Resources Information Center
Texas Education Agency, Austin.
As an assist to the superintendent and members of his staff, this booklet has been prepared for obtaining information in the field of building, planning and construction. Topics discussed are--(1) structure, (2) roofs, (3) floor construction, (4) floor finishes, (5) ceilings, (6) exterior wall construction, (7) interior walls and partitions, (8)…
36 CFR 28.23 - Certificates of suspension of authority for acquisition by condemnation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... developed area on the ground level; (2) On the survey, the line of mean high water, the toe of the dune, and the crest of the dune shall be identified if they traverse the lot; (3) A floor plan of each floor of...
LOFT. Reactor support apparatus inside containment building (TAN650). Camera is ...
LOFT. Reactor support apparatus inside containment building (TAN-650). Camera is on crane rail level and facing northerly. View shows top two banks of round conduit openings on wall for electrical and other connections to control room. Ladders and platforms provide access to reactor instrumentation. Note hatch in floor and drain at edge of floor near wall. Date: 1974. INEEL negative no. 74-219 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
12. FLOOR BEAMS, BRACKETS, STRINGERS. (Also includes a schedule of ...
12. FLOOR BEAMS, BRACKETS, STRINGERS. (Also includes a schedule of parts.) American Bridge Company, Ambridge Plant No. 5, sheet no. 2, dated April 2, 1928 (revised 4-24-28), order no. F5073. For U.S. Steel Products Company, Pacific Coast Depot, order no. SF578. For Southern Pacific Company, order no. 8873-P-28746. Scale 1/4 inch to one foot. - Napa River Railroad Bridge, Spanning Napa River, east of Soscol Avenue, Napa, Napa County, CA
2012-09-01
suspended in the runoff waters around the lakebeds, sealing lakebed surface cracks and filling fissures. Shallow flooding along with consistent winds are...of the recorded specimens consist of isolated fragments of tooth enamel or bone that are not securely dated. Irvingtonian fossil localities have...require frequent repair as well. Concrete floors are cracking throughout all four test cells. Entry doors sag and drag on buckled floors. One-half
LOFT. Containment and service building (TAN650). Section through north/south axis. ...
LOFT. Containment and service building (TAN-650). Section through north/south axis. Shows basement and four additional levels of pre-amp tower, shielded roadway, chambers below reactor floor, railroad door, sumps, shielding. Section C shows basement sumps and chambers below reactor floor. Kaiser engineers 6413-11-STEP/LOFT-650-A-5. Date: October 1964. INEEL index code no. 036-650-00-486-122217 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID
BUILDING A196 BARRACKS, FIRST FLOOR PLAN. Naval Guided Missile and ...
BUILDING A-196 BARRACKS, FIRST FLOOR PLAN. Naval Guided Missile and Tactical Data System School, Naval Schools Command, Mare Island, California. Milton T. Pflueger, Architect, 580 Market Street, San Francisco, CA. Sheet 126 of 145, specification 36050-61, approved for the Bureau of Yards and Docks, October 26, 1961. Yards and Docks drawing no. 892274; DPWO drawing no. B-75274; file no. 930-CR-1. 72 cm x 98 xm. Sepia tone print - Mare Island Naval Shipyard, Guard House & Barracks, Railroad Avenue near Eighteenth Street, Vallejo, Solano County, CA
BUILDING A196 BARRACKS, SECOND FLOOR PLAN. Naval Guided Missile and ...
BUILDING A-196 BARRACKS, SECOND FLOOR PLAN. Naval Guided Missile and Tactical Data System School, Naval Schools Command, Mare Island, CA. Milton T. Pflueger, Architect, 580 Market Street, San Francisco, CA. Sheet 127 to 145, specification 36050/61, approved for the Bureau of Yards and Docks, October 26, 1961. Yards and Docks drawing no. 892275; DPWO drawing no. B-75275; file no. 930-CR-2. 72 cm x 98 cm. Sepia tone print - Mare Island Naval Shipyard, Guard House & Barracks, Railroad Avenue near Eighteenth Street, Vallejo, Solano County, CA
FAST CHOPPER DETECTOR HOUSE, TRA665. FIRST FLOOR, PLAN AND SECTION, ...
FAST CHOPPER DETECTOR HOUSE, TRA-665. FIRST FLOOR, PLAN AND SECTION, AS PROPOSED FOR MODIFICATION IN 1962. CONCRETE WALLS THREE FEET THICK. EXISTING WINDOWS IN MTR AND DETECTOR HOUSE WALLS WERE TO BE FILLED IN WITH HIGH-DENSITY BRICK. NOTE 20-METER MARK, WHERE THE FAST CHOPPER DETECTOR HAD BEEN LOCATED. F.C. TORKELSON 842-MTR-665-S-2, 4/1962. INL INDEX NO. 531-0665-60-851-150996, REV. 5. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Morita, Daiki; Numajiri, Toshiaki; Tsujiko, Shoko; Nakamura, Hiroko; Yamochi, Ryo; Sowa, Yoshihiro; Yasuda, Makoto; Hirano, Shigeru
2017-11-01
Computer-aided design/computer-aided manufacturing (CAD/CAM) guides are now widely used in maxillofacial reconstruction. However, there are few reports of CAD/CAM guides being used for scapular flaps. The authors performed the secondary maxillary and orbital floor reconstruction using a free latissimus dorsi muscle, cutaneous tissue, and scapular flap designed using CAD/CAM techniques in a 72-year-old man who had undergone partial maxillectomy four years previously. The patient had diplopia, the vertical dystopia of eye position, and a large oral-nasal-cutaneous fistula. After the operation, the authors confirmed that the deviation between the postoperative and preoperative planning three-dimensional images was less than 2 mm. Because scapular guides require 3 cutting surfaces, the shape of the scapular guide is more complex than that of a conventional fibular guide. In orbital floor reconstruction, the use of a CAM technique such as that used to manufacture the authors' fixation guide is as necessary for accurate, safe, and easy reconstruction as is preoperative CAD planning. The production of a fixation guide as well as a cutting guide is particularly useful because it is difficult to determine the angle for reconstructing the orbital floor by freehand techniques. In this case, the orbital floor was reconstructed based on a mirror image of the healthy side to avoid overcompression of the orbital tissue. Although the patient's vertical dystopia of eye position was improved, diplopia was not improved because, for greater safety, the authors did not plan overcorrection of the orbital volume.
15. Photograph of line drawing in possession of Engineering Plans ...
15. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. SECOND FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
14. Photograph of line drawing in possession of Engineering Plans ...
14. Photograph of line drawing in possession of Engineering Plans and Services Division, Rock Island Arsenal. FIRST FLOOR PLAN, 1920. - Rock Island Arsenal, Building No. 90, East Avenue between North Avenue & King Drive, Rock Island, Rock Island County, IL
Planning and Equipping a New Machine Shop
ERIC Educational Resources Information Center
Bloom, Nick
1978-01-01
The author describes the planning and equipping of a new machine shop facility at the East Los Angeles Occupational Center. Lists of machine shop and classroom equipment, a floor plan of the facility, and some new shop curriculum approaches are included. (MF)
Architectural Drafting, Drafting 2: 9255.04.
ERIC Educational Resources Information Center
Dade County Public Schools, Miami, FL.
The course covers the basic fundamentals of architectural drafting and is not intended to delve into the more advanced phases of architecture. The student is presented with standards and procedures, and will become proficient in layout of floor plans, electrical plans, roof construction, foundation plans, typical wall construction, plot plans, and…
7 CFR 1753.26 - Plans and specifications (P&S).
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 11 2011-01-01 2011-01-01 false Plans and specifications (P&S). 1753.26 Section 1753... Buildings § 1753.26 Plans and specifications (P&S). (a) For headquarters and commercial office buildings only, the borrower shall prepare preliminary P&S showing the floor plan and general architectural...
7 CFR 1753.26 - Plans and specifications (P&S).
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 11 2014-01-01 2014-01-01 false Plans and specifications (P&S). 1753.26 Section 1753... Buildings § 1753.26 Plans and specifications (P&S). (a) For headquarters and commercial office buildings only, the borrower shall prepare preliminary P&S showing the floor plan and general architectural...
7 CFR 1753.26 - Plans and specifications (P&S).
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 11 2013-01-01 2013-01-01 false Plans and specifications (P&S). 1753.26 Section 1753... Buildings § 1753.26 Plans and specifications (P&S). (a) For headquarters and commercial office buildings only, the borrower shall prepare preliminary P&S showing the floor plan and general architectural...
7 CFR 1753.26 - Plans and specifications (P&S).
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 11 2012-01-01 2012-01-01 false Plans and specifications (P&S). 1753.26 Section 1753... Buildings § 1753.26 Plans and specifications (P&S). (a) For headquarters and commercial office buildings only, the borrower shall prepare preliminary P&S showing the floor plan and general architectural...
Short communication: Flooring preferences of dairy cows at calving.
Campler, M; Munksgaard, L; Jensen, M B; Weary, D M; von Keyserlingk, M A G
2014-02-01
The present study investigated the flooring preference during the 30 h before parturition in Holstein dairy cows housed individually in a maternity pen. Seventeen multiparous cows were moved, on average, 2 d before expected calving date into an individual maternity pen with 3 different flooring surfaces: 10 cm of sand, pebble-top rubber mats, or concrete flooring, each covered with 15 cm of straw. Calving location, lying time, and total time and number of lying bouts on each of the floor types were recorded during 2 periods: precalving (24 to 29 h before calving) and at calving (0 to 5h before calving). Ten cows calved on sand, 6 on concrete, and 1 on the rubber mat. Lying bouts increased during the hours closest to calving, regardless of flooring. The number of lying bouts did not differ between flooring types precalving but cows had more lying bouts on sand and concrete compared with rubber at calving. Cows spent more time lying down on sand and concrete compared with rubber precalving, but lying times did not differ between treatments at calving. Cows that calved on sand spent more time lying on sand at calving compared with the other 2 flooring types. Cows that calved on concrete did not show a flooring preference at calving. These results indicate that rubber mats are the least preferred by dairy cows in the maternity pens, even when covered with a deep layer of straw. Copyright © 2014 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.
50. Photocopy of Architectural drawing, dated August 6, 1976 by ...
50. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-5 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FOURTH FLOOR AND PLATFORM 4A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
51. Photocopy of Architectural drawing, dated August 6, 1976 by ...
51. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-6 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - FIFTH FLOOR AND PLATFORM 5A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
49. Photocopy of Architectural drawing, dated August 6, 1976 by ...
49. Photocopy of Architectural drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. A-4 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - THIRD FLOOR AND PLATFORM 3A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
5. Photographic copy of inkcolinen drawing dated 1923; Henschien & ...
5. Photographic copy of ink-co-linen drawing dated 1923; Henschien & McLaren Architects, Chicago; Original in collection of Rath drawings and blueprints owned by Waterloo Community Development Board, Waterloo, Iowa; SECTION, SHOWING LOCATIONS OF KILLING FLOOR AND BY-PRODUCTS DEPARTMENTS - Rath Packing Company, Hog Killing & By-Products Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA
26. Photographic copy of original design drawing, dated January 1970, ...
26. Photographic copy of original design drawing, dated January 1970, revised 2 January 1974 (original Army Operation Drawing in possession of the U.S. Army Corps of Engineers, Huntsville Division) Composite removable third floor and duplexer area - Stanley R. Mickelsen Safeguard Complex, Missile Site Control Building, Northeast of Tactical Road; southeast of Tactical Road South, Nekoma, Cavalier County, ND
Deep-ocean basalts: inert gas content and uncertainties in age dating.
Noble, C S; Naughton, J J
1968-10-11
The radiogenic argon and helium contents of three basalts erupted into the deep ocean from an active volcano (Kilauea) have been measured. Ages calculated from these measurements increase with sample depth up to 22 million years for lavas deduced to be recent. Caution is urged in applying dates from deep-ocean basalts in studies on ocean-floor spreading.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
... proposed rule change is to correct Rule 616 to correspond to amended Equity Floor Procedure Advice (``EFPA'') A-7 and Options Floor Procedure Advice (``OFPA'') F-34 (together, the ``Advices'').\\5\\ \\5\\ The... plans for the abbreviated reporting of minor disciplinary infractions. Any disciplinary action taken by...
7. Photocopy of War Department drawing (original located at Fort ...
7. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN & ROOF FRAMING PLAN, PLAN NUMBER 1496 - Fort McCoy, Building No. T-1033, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Archaeomagnetic investigation and dating of Neolithic archaeological site (Kovatchevo) from Bulgaria
NASA Astrophysics Data System (ADS)
Kovacheva, M.; Jordanova, N.; Kostadinova, M.
2003-04-01
Archaeomagnetic investigation of direction and palaeointensity was carried out on a collection of samples from Neolithic kiln, excavated at Kovatchevo site. Suitability of the materials for obtaining reliable archaeomagnetic results was checked by applying different rock-magnetic experiments. The obtained values of viscosity index and Koeningsberger ratio show favorable stability characteristics of the burnt clay. The main magnetic minerals, identified by Curie temperature analysis through high-temperature behavior of magnetic susceptibility, and three-axes thermal demagnetization of IRM, show the prevailing role of magnetite and Ti-magnetite. However, investigations on the chemical changes occurring during laboratory heating show overall bad thermal stability of the studied materials, which is not good indication concerning palaeointensity determination. Palaeodirection investigation of samples, taken from different parts of the walls and kiln's floor, reveals possible influence of magnetic refraction - higher Inclination values and azymuthal dependence of Declination for the samples from walls; lower Inclination values from floor's samples. Definitive directional results are determined by averaging data for all samples, which are well distributed all over walls and three kiln's floors. For palaeointensity evaluation rock-magnetic studies are carefully considered and strict acception criteria applied. Archaeomagnetic dating of the studied kiln was performed according to the newly developed method (Lanos, 2001). Final dating, taking into account directional and intensity results, gives the most probable time interval of the last kiln's usage between 5712-5571 BC. Dating result is in agreement with archaeological findings for Bulgarian Early Neolithic and most of 14C data available. This study is supported by EU-funded project AARCH, contract No HPRN-CT-2002-00219 and Mission archeologique de la Vallee du Strymon (Centre de Recherches Protohistorique de l'Universite de Paris).
PBF Reactor Building (PER620). Camera on main floor faces south ...
PBF Reactor Building (PER-620). Camera on main floor faces south (open) doorway. In foreground is canal gate, lined with stainless steel and painted with protective coatings. Reactor pit is round with protective coatings. Reactor put is round form discernible beyond. Lifting beams and rigging are in place for a load test before reactor vessel arrives. Photographer: John Capek. Date: January 26, 1970. INEEL negative no. 70-347 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smeenk, Robert Jan, E-mail: r.smeenk@rther.umcn.nl; Hoffmann, Aswin L.; Hopman, Wim P.M.
2012-06-01
Purpose: To delineate the individual pelvic floor muscles considered to be involved in anorectal toxicity and to investigate dose-effect relationships for fecal incontinence-related complaints after prostate radiotherapy (RT). Methods and Materials: In 48 patients treated for localized prostate cancer, the internal anal sphincter (IAS) muscle, the external anal sphincter (EAS) muscle, the puborectalis muscle (PRM), and the levator ani muscles (LAM) in addition to the anal wall (Awall) and rectal wall (Rwall) were retrospectively delineated on planning computed tomography scans. Dose parameters were obtained and compared between patients with and without fecal urgency, incontinence, and frequency. Dose-effect curves were constructed.more » Finally, the effect of an endorectal balloon, which was applied in 28 patients, was investigated. Results: The total volume of the pelvic floor muscles together was about three times that of the Awall. The PRM was exposed to the highest RT dose, whereas the EAS received the lowest dose. Several anal and rectal dose parameters, as well as doses to all separate pelvic floor muscles, were associated with urgency, while incontinence was associated mainly with doses to the EAS and PRM. Based on the dose-effect curves, the following constraints regarding mean doses could be deduced to reduce the risk of urgency: {<=}30 Gy to the IAS; {<=}10 Gy to the EAS; {<=}50 Gy to the PRM; and {<=}40 Gy to the LAM. No dose-effect relationships for frequency were observed. Patients treated with an endorectal balloon reported significantly less urgency and incontinence, while their treatment plans showed significantly lower doses to the Awall, Rwall, and all pelvic floor muscles. Conclusions: Incontinence-related complaints show specific dose-effect relationships to individual pelvic floor muscles. Dose constraints for each muscle can be identified for RT planning. When only the Awall is delineated, substantial components of the continence apparatus are excluded.« less
Smeenk, Robert Jan; Hoffmann, Aswin L; Hopman, Wim P M; van Lin, Emile N J Th; Kaanders, Johannes H A M
2012-06-01
To delineate the individual pelvic floor muscles considered to be involved in anorectal toxicity and to investigate dose-effect relationships for fecal incontinence-related complaints after prostate radiotherapy (RT). In 48 patients treated for localized prostate cancer, the internal anal sphincter (IAS) muscle, the external anal sphincter (EAS) muscle, the puborectalis muscle (PRM), and the levator ani muscles (LAM) in addition to the anal wall (Awall) and rectal wall (Rwall) were retrospectively delineated on planning computed tomography scans. Dose parameters were obtained and compared between patients with and without fecal urgency, incontinence, and frequency. Dose-effect curves were constructed. Finally, the effect of an endorectal balloon, which was applied in 28 patients, was investigated. The total volume of the pelvic floor muscles together was about three times that of the Awall. The PRM was exposed to the highest RT dose, whereas the EAS received the lowest dose. Several anal and rectal dose parameters, as well as doses to all separate pelvic floor muscles, were associated with urgency, while incontinence was associated mainly with doses to the EAS and PRM. Based on the dose-effect curves, the following constraints regarding mean doses could be deduced to reduce the risk of urgency: ≤ 30 Gy to the IAS; ≤ 10 Gy to the EAS; ≤ 50 Gy to the PRM; and ≤ 40 Gy to the LAM. No dose-effect relationships for frequency were observed. Patients treated with an endorectal balloon reported significantly less urgency and incontinence, while their treatment plans showed significantly lower doses to the Awall, Rwall, and all pelvic floor muscles. Incontinence-related complaints show specific dose-effect relationships to individual pelvic floor muscles. Dose constraints for each muscle can be identified for RT planning. When only the Awall is delineated, substantial components of the continence apparatus are excluded. Copyright © 2012 Elsevier Inc. All rights reserved.
78 FR 76660 - Arts Advisory Panel Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-18
... p.m. in room 716. Music (review of nominations): This meeting will be closed. Dates: January 14... Columbus Circle, 12th Floor, New York, NY 10019. Music (application review): This meeting will be virtual...
76 FR 24463 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, May 20, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. [[Page 24464
7. This photographic copy of an engineering drawing displays the ...
7. This photographic copy of an engineering drawing displays the building's floor plan in its 1995 arrangement, with rooms designated. California Institute of Technology, Jet Propulsion Laboratory, Facilities Engineering and Construction Office, "Addition to Weigh & Control Bldg. E-35, Demolition, Floor and Roof Plans," drawing no. E35/3-0, October 5, 1983. California Institute of Technology, Jet Propulsion Laboratory, Plant Engineering: engineering drawings of structures at JPL Edwards Facility. Drawings on file at JPL Plant Engineering, Pasadena, California. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
Falls from height during the floor slab formwork of buildings: current situation in Spain.
Adam, Jose M; Pallarés, Francisco J; Calderón, Pedro A
2009-01-01
One of the phases with the highest risk of falls from a height in the construction of a building is during the floor slab formwork stage. This paper analyzes this particular risk, as well as the most frequently used fall-protection systems. A survey was carried out to define the current situation in Spain with regard to falls from a height during floor slab formwork and the fall-protection systems used to prevent such a risk. The results of the survey clarified the current situation in Spain with regard to this risk, and made it clear that there is considerable risk of falling from a height during the floor slab formwork stage. All the safety systems analyzed presented a series of weak points that should be studied in detail before they can be used on building sites. The risk of falling associated with floor slab formwork and the most frequently used protection systems are analyzed. As no research had been carried out to date on this type of risk, we consider the research presented in this article to be a pioneer in the field.
48. Photocopy of Architectural Layout drawing, dated August 6, 1976 ...
48. Photocopy of Architectural Layout drawing, dated August 6, 1976 by Raytheon Company. Original drawing property of United States Air Force, 21" Space Command. AL-2 - PAVE PAWS TECHNICAL FACILITY - OTIS AFB - EQUIPMENT LAYOUT - SECOND FLOOR AND PLATFORM 2A. DRAWING NO. AW35-46-06 - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
415. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...
415. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; DIVISION OF SAN FRANCISCO BAY TOLL CROSSINGS; SAN FRANCISCO OAKLAND BAY BRIDGE RECONSTRUCTION; STEEL WORK - WEST BAY; Y.B. ANCHORAGE - FLOOR BEAMS YA-5 AND BENT 3; SHEET NO. 22; DRAWING NO. C-4028-22R - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA
7 CFR Exhibit B to Subpart A of... - Requirements for Modular/Panelized Housing Units
Code of Federal Regulations, 2010 CFR
2010-01-01
..., log wall houses, trussed roof rafters or floor trusses; open panel walls, and other types that can be... windows or crawl space vents with all sizes indicated. 2. Floor Plans of all levels. Show square footage... levels is required to indicate intended occupancy functions of the design. A window and door schedule...
7 CFR Exhibit B to Subpart A of... - Requirements for Modular/Panelized Housing Units
Code of Federal Regulations, 2011 CFR
2011-01-01
..., log wall houses, trussed roof rafters or floor trusses; open panel walls, and other types that can be... windows or crawl space vents with all sizes indicated. 2. Floor Plans of all levels. Show square footage... levels is required to indicate intended occupancy functions of the design. A window and door schedule...
15. Photocopy of Sheet 1 of Building Plan R41A, (USDA, ...
15. Photocopy of Sheet 1 of Building Plan R4-1A, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRONT ELEVATION AND FLOOR PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
10. Photocopy of Sheet 1 of Building Plan R453 (USDA, ...
10. Photocopy of Sheet 1 of Building Plan R4-53 (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) FRONT AND SIDE ELEVATIONS AND FLOOR PLAN - Buffalo Guard Station, Residence, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
A BASIS FOR MODIFYING THE TANK 12 COMPOSITE SAMPLING DESIGN
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shine, G.
The SRR sampling campaign to obtain residual solids material from the Savannah River Site (SRS) Tank Farm Tank 12 primary vessel resulted in obtaining appreciable material in all 6 planned source samples from the mound strata but only in 5 of the 6 planned source samples from the floor stratum. Consequently, the design of the compositing scheme presented in the Tank 12 Sampling and Analysis Plan, Pavletich (2014a), must be revised. Analytical Development of SRNL statistically evaluated the sampling uncertainty associated with using various compositing arrays and splitting one or more samples for compositing. The variance of the simple meanmore » of composite sample concentrations is a reasonable standard to investigate the impact of the following sampling options. Composite Sample Design Option (a). Assign only 1 source sample from the floor stratum and 1 source sample from each of the mound strata to each of the composite samples. Each source sample contributes material to only 1 composite sample. Two source samples from the floor stratum would not be used. Composite Sample Design Option (b). Assign 2 source samples from the floor stratum and 1 source sample from each of the mound strata to each composite sample. This infers that one source sample from the floor must be used twice, with 2 composite samples sharing material from this particular source sample. All five source samples from the floor would be used. Composite Sample Design Option (c). Assign 3 source samples from the floor stratum and 1 source sample from each of the mound strata to each composite sample. This infers that several of the source samples from the floor stratum must be assigned to more than one composite sample. All 5 source samples from the floor would be used. Using fewer than 12 source samples will increase the sampling variability over that of the Basic Composite Sample Design, Pavletich (2013). Considering the impact to the variance of the simple mean of the composite sample concentrations, the recommendation is to construct each sample composite using four or five source samples. Although the variance using 5 source samples per composite sample (Composite Sample Design Option (c)) was slightly less than the variance using 4 source samples per composite sample (Composite Sample Design Option (b)), there is no practical difference between those variances. This does not consider that the measurement error variance, which is the same for all composite sample design options considered in this report, will further dilute any differences. Composite Sample Design Option (a) had the largest variance for the mean concentration in the three composite samples and should be avoided. These results are consistent with Pavletich (2014b) which utilizes a low elevation and a high elevation mound source sample and two floor source samples for each composite sample. Utilizing the four source samples per composite design, Pavletich (2014b) utilizes aliquots of Floor Sample 4 for two composite samples.« less
76 FR 67155 - Privacy Act of 1974; System of Records
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
..., East Tower, 2nd Floor, Suite 02G09, Alexandria, VA 22350-3100. Instructions: All submissions received... address, home phone number, cell phone number, email addresses, rank/ grade, date of rank, nationality...
76 FR 60474 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
...: Business or other for-profit; not-for-profit institutions. Frequency: On occasion. Respondent's Obligation... Center Drive, 2nd Floor, East Tower, Suite 02G09, Alexandria, VA 22350-3100. Dated: September 23, 2011...
9 CFR 590.146 - Application for continuous inspection in official plants; approval.
Code of Federal Regulations, 2010 CFR
2010-01-01
... copies of each print drawing as specified in this section of the complete floor plan, plot plan... zip code or an accurate description of the location. (3) Plot plan of entire premises shall include..., and vehicular loading areas. The plot plan may be drawn to a scale of one-thirty-second inch per foot...
Role of conventional radiology and MRi defecography of pelvic floor hernias
2013-01-01
Background Purpose of the study is to define the role of conventional radiology and MRI in the evaluation of pelvic floor hernias in female pelvic floor disorders. Methods A MEDLINE and PubMed search was performed for journals before March 2013 with MeSH major terms 'MR Defecography' and 'pelvic floor hernias'. Results The prevalence of pelvic floor hernias at conventional radiology was higher if compared with that at MRI. Concerning the hernia content, there were significantly more enteroceles and sigmoidoceles on conventional radiology than on MRI, whereas, in relation to the hernia development modalities, the prevalence of elytroceles, edroceles, and Douglas' hernias at conventional radiology was significantly higher than that at MRI. Conclusions MRI shows lower sensitivity than conventional radiology in the detection of pelvic floor hernias development. The less-invasive MRI may have a role in a better evaluation of the entire pelvic anatomy and pelvic organ interaction especially in patients with multicompartmental defects, planned for surgery. PMID:24267789
9. Photocopy of Sheet 1 of Building Plan R451, (USDA, ...
9. Photocopy of Sheet 1 of Building Plan R4-51, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) Front, Rear, and Side Elevations and Floor Plan. - Buffalo Guard Station, Office, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
4. Photocopy of Sheet 1 of Building Plan R421, (USDA, ...
4. Photocopy of Sheet 1 of Building Plan R4-21, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings') FRONT AND SIDE ELEVATIONS, FLOOR AND FOUNDATION PLANS. - Buffalo Guard Station, Garage, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
Graduate House, University of Toronto, Ontario.
ERIC Educational Resources Information Center
Stephens, Suzanne
2002-01-01
Illustrates how the University of Toronto combined the modernist architectural typologies of perimeter block and the skip- stop plan to create a dormitory that served as a gateway to its campus. Photos and a floor plan are included. (GR)
Searching for Planning and Design Solutions.
ERIC Educational Resources Information Center
Roark, Steven
2001-01-01
Presents the fourth article in a series on the Longview Community College (Kansas City, Missouri) Liberal Arts building project. How architects are revising floor plans, evaluating building systems, deciding on furniture, and dealing with building codes are discussed. (GR)
Ussing, Anja; Dahn, Inge; Due, Ulla; Sørensen, Michael; Petersen, Janne; Bandholm, Thomas
2017-12-01
Faecal incontinence affects approximately 8-9% of the adult population. The condition is surrounded by taboo; it can have a devastating impact on quality of life and lead to major limitations in daily life. Pelvic floor muscle training in combination with information and fibre supplements is recommended as first-line treatment for faecal incontinence. Despite this, the effect of pelvic floor muscle training for faecal incontinence is unclear. No previous trials have investigated the efficacy of supervised pelvic floor muscle training in combination with conservative treatment and compared this to an attention-control massage treatment including conservative treatment. The aim of this trial is to investigate if 16 weeks of supervised pelvic floor muscle training in combination with conservative treatment is superior to attention-control massage treatment and conservative treatment in patients with faecal incontinence. Randomised, controlled, superiority trial with two parallel arms. 100 participants with faecal incontinence will be randomised to either (1) individually supervised pelvic floor muscle training and conservative treatment or (2) attention-control massage treatment and conservative treatment. The primary outcome is participants' rating of symptom changes after 16 weeks of treatment using the Patient Global Impression of Improvement Scale. Secondary outcomes are the Vaizey Incontinence Score, the Fecal Incontinence Severity Index, the Fecal Incontinence Quality of Life Scale, a 14-day bowel diary, anorectal manometry and rectal capacity measurements. Follow-up assessment at 36 months will be conducted. This paper describes and discusses the rationale, the methods and in particular the statistical analysis plan of this trial.
Huneau-Salaün, A; Michel, V; Balaine, L; Petetin, I; Eono, F; Ecobichon, F; Bouquin, S Le
2010-04-01
1. The aim in this study was to evaluate cleaning and disinfection programmes in battery cage and on-floor layer houses in France. 2. Cleaning and disinfection efficiency was assessed by a visual evaluation of cleaning and a bacteriological monitoring of surface contamination from counts of thermotolerant streptococci on contact agar plates. 3. In battery cage houses, dropping belts, manure conveyors, and house floors remained highly contaminated due to poor cleaning in half of the buildings examined. 4. In on-floor houses, a high standard of cleaning was achieved but errors in the planning of cleaning and disinfection operations sometimes led to a high residual contamination of nest boxes and egg sorting tables.
36. Photocopy of drawing (November 1934 architectural drawings by Burge ...
36. Photocopy of drawing (November 1934 architectural drawings by Burge and Stevens, in possession of the Engineering and Capital Improvements Department of the Atlanta Housing Authority, Atlanta, Georgia). FIRST FLOOR PLAN (WITH VIGNETTES OF THIRD FLOOR) AND BATHROOM SECTIONS OF TECHWOOD PROJECT # 1101, SHEET A-46. - Techwood Homes, McDaniel Dormitory, 581-587 Techwood Drive, Atlanta, Fulton County, GA
48. Photocopy of copy of original Officers' Duplex Quarters drawing ...
48. Photocopy of copy of original Officers' Duplex Quarters drawing by Turner, 7 April 1932 (original in possession of Veterans Administration, Wichita, Kansas, copy at Ablah Library, Wichita State University). Attic and roof, basement, first floor, and second floor plans - Veterans Administration Center, Officers Duplex Quarters, 5302 East Kellogg (Legal Address); 5500 East Kellogg (Common Address), Wichita, Sedgwick County, KS
4. "ARCHITECTURAL, FLOOR PLAN-ELEVATIONS-SECTIONS, OBSERVATION BUNKERS." Specifications No. ENG (NASA)04-353-63-1; Drawing No. 60-09-34; sheet 325. Ref. No. A-13. D.O. SERIES 1597/87. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunker 1-D-3, Test Area 1-125, northwest end of Altair Boulevard, Boron, Kern County, CA
75 FR 68773 - Meeting of the Ocean Research and Resources Advisory Panel
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
... Consortium for Ocean Leadership, 1201 New York Avenue, NW., 4th Floor, Washington, DC 20005. FOR FURTHER... science and management communities. Dated: November 2, 2010. D.J. Werner, Lieutenant Commander, Office of...
a Schema for Extraction of Indoor Pedestrian Navigation Grid Network from Floor Plans
NASA Astrophysics Data System (ADS)
Niu, Lei; Song, Yiquan
2016-06-01
The requirement of the indoor navigation related tasks such emergency evacuation calls for efficient solutions for handling data sources. Therefore, the navigation grid extraction from existing floor plans draws attentions. To this, we have to thoroughly analyse the source data, such as Autocad dxf files. Then, we could establish a sounding navigation solution, which firstly complements the basic navigation rectangle boundaries, secondly subdivides these rectangles and finally generates accessible networks with these refined rectangles. Test files are introduced to validate the whole workflow and evaluate the solution performance. In conclusion, we have achieved the preliminary step of forming up accessible network from the navigation grids.
ERIC Educational Resources Information Center
BECKER, JOHN W.
THIS BOOK IS DESIGNED PARTICULARLY FOR THOSE PLANNING PHYSICAL FACILITIES FOR ADULT EDUCATION. FLOOR PLANS, PHOTOGRAPHS AND DISCUSSION ARE GIVEN FOR BUILDINGS USED FOR HOSPITALS, HEALTH CENTERS, INDUSTRY, ELEMENTARY SCHOOLS, HIGH SCHOOLS, COLLEGE BUILDINGS, FINE ARTS, LIBRARIES, RECREATION COMMUNITY CENTERS, AND ADULT EDUCATION. COPIES OF THIS…
24. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, ...
24. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, Natick, Mass, Climatic Building, First Floor Plan, Architectural. Drawing No. 35-07-01, Sheet 2 of 72, 1952, updated to 1985. (Source: NRDEC). - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA
Athletic Facilities: Planning, Designing, and Operating Today's Physical-Education Centers.
ERIC Educational Resources Information Center
Spoor, Dana L.
1998-01-01
Examines what should be featured in an athletic facility, how to plan for the many different sports and activities that will be housed, and how to get the community involved. Areas addressed include planning for locker rooms and storage, flooring and lighting, building code adherence, spectator seating, building security, and outdoor recreation…
25. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, ...
25. PHOTOCOPY OF PLAN DRAWING. Quartermaster Research and Development Laboratory, Natick, Mass. Climatic Building, First Floor Plan, Refrigeration and Engineering. Drawing No. 35-07-01, Sheet 52 of 72, 1952. (Source: NRDEC). - Natick Research & Development Laboratories, Climatic Chambers Building, U.S. Army Natick Research, Development & Engineering Center (NRDEC), Natick, Middlesex County, MA
Residential smoke alarms and fire escape plans.
Harvey, P A; Sacks, J J; Ryan, G W; Bender, P F
1998-01-01
To estimate the proportion of U.S. homes with installed smoke alarms, smoke alarms on the same floor as occupants' bedrooms, and fire escape plans. The authors analyzed data on smoke alarm use and fire escape planning from a 1994 stratified random telephone survey of 5238 U.S. households. Respondents from 91% of surveyed households reported the presence of at least one installed smoke alarm, and 94% of respondents reported having an alarm on the same level of the home as their sleeping area. The prevalence of installed smoke alarms varied by highest education level in the household and income level. Sixty percent of all households had designed or discussed a fire escape plan at least once; only 17% of these households had actually practiced one. Although overall use of smoke alarms was high, certain population subgroups were less likely to have smoke alarms or to have them installed on the same floor as bedrooms. Fire escape planning, another important safety measure, was somewhat less common, and very few respondents reported having practiced a fire escape plan with the members of their household.
Residential smoke alarms and fire escape plans.
Harvey, P A; Sacks, J J; Ryan, G W; Bender, P F
1998-01-01
OBJECTIVE: To estimate the proportion of U.S. homes with installed smoke alarms, smoke alarms on the same floor as occupants' bedrooms, and fire escape plans. METHODS: The authors analyzed data on smoke alarm use and fire escape planning from a 1994 stratified random telephone survey of 5238 U.S. households. RESULTS: Respondents from 91% of surveyed households reported the presence of at least one installed smoke alarm, and 94% of respondents reported having an alarm on the same level of the home as their sleeping area. The prevalence of installed smoke alarms varied by highest education level in the household and income level. Sixty percent of all households had designed or discussed a fire escape plan at least once; only 17% of these households had actually practiced one. CONCLUSIONS: Although overall use of smoke alarms was high, certain population subgroups were less likely to have smoke alarms or to have them installed on the same floor as bedrooms. Fire escape planning, another important safety measure, was somewhat less common, and very few respondents reported having practiced a fire escape plan with the members of their household. PMID:9769771
Mitchell, Carl P J; Kolka, Randall K; Fraver, Shawn
2012-08-07
A number of factors influence the amount of mercury (Hg) in forest floors and soils, including deposition, volatile emission, leaching, and disturbances such as fire. Currently the impact on soil Hg pools from other widespread forest disturbances such as blowdown and management practices like salvage logging are unknown. Moreover, ecological and biogeochemical responses to disturbances are generally investigated within a single-disturbance context, with little currently known about the impact of multiple disturbances occurring in rapid succession. In this study we capitalize on a combination of blowdown, salvage logging and fire events in the sub-boreal region of northern Minnesota to assess both the singular and combined effects of these disturbances on forest floor and soil total Hg concentrations and pools. Although none of the disturbance combinations affected Hg in mineral soil, we did observe significant effects on both Hg concentrations and pools in the forest floor. Blowdown increased the mean Hg pool in the forest floor by 0.76 mg Hg m(-2) (223%). Salvage logging following blowdown created conditions leading to a significantly more severe forest floor burn during wildfire, which significantly enhanced Hg emission. This sequence of combined events resulted in a mean loss of approximately 0.42 mg Hg m(-2) (68% of pool) from the forest floor, after conservatively accounting for potential losses via enhanced soil leaching and volatile emissions between the disturbance and sampling dates. Fire alone or blowdown followed by fire did not significantly affect the total Hg concentrations or pools in the forest floor. Overall, unexpected consequences for soil Hg accumulation and by extension, atmospheric Hg emission and risk to aquatic biota, may result when combined impacts are considered in addition to singular forest floor and soil disturbances.
75 FR 76494 - Sunshine Act Meeting; Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... LEGAL SERVICES CORPORATION Sunshine Act Meeting; Notice TIME AND DATE: The Legal Services Corporation Board of Directors' Operations & Regulations Committee (``Committee'') will meet telephonically on... Committee's agenda. LOCATION: Legal Services Corporation, F. William McCalpin Conference Center, 3rd Floor...
52. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...
52. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown DETAILS OF MAIN FLOOR ELEVATOR LOBBY - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA
53. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print ...
53. Photocopy of drawing (Source unknown, 1928) Rapid Blue Print Co., Los Angeles, CA, Photographer, Date unknown DETAILS OF CORRIDORS ON SECOND - TWELFTH FLOORS - Richfield Oil Building, 555 South Flower Street, Los Angeles, Los Angeles County, CA
75 FR 21246 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., May 21, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance Matters. [[Page 21247
75 FR 26942 - Sunshine Act Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-13
... Service, 9th Floor, Room 9802B, 1201 New York Avenue, NW., Washington, DC 20525. Phone (202) 606-6696. Fax (202) 606-3462. TDD: (202) 606-3472. E-mail: [email protected] . Dated: May 10, 2010. Frank R. Trinity...
ARCHITECTURAL, 777M, PHYSICS ASSEMBLY LABORATORY BUILDING, PLAN OF +131 AND ...
ARCHITECTURAL, 777-M, PHYSICS ASSEMBLY LABORATORY BUILDING, PLAN OF +13-1 AND +27-0 FLOOR LEVELS (W157114) - Physics Assembly Laboratory, Area A/M, Savannah River Site, Aiken, Aiken County, SC
8. Photocopy of War Department drawing (original located at Fort ...
8. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN, PLAN NUMBER 800-1514 - Fort McCoy, Building No. T-1032, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department (original located at Fort McCoy, Wisconsin) ...
Photocopy of War Department (original located at Fort McCoy, Wisconsin) FOUNDATION, FRAMING & FLOOR PLANS, PLAN NUMBER 1100-660 - Fort McCoy, Building No. T-1039, North side of Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-484 - Fort McCoy, Building No. T-1003, South Side of Eleventh Avenue, Block 10, Sparta, Monroe County, WI
5. Photocopy of War Department drawing (original located at Fort ...
5. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-438 - Fort McCoy, Building No. T-1054, South side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-463 - Fort McCoy, Building No. T-1022, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-1240 - Fort McCoy, Building No. T-1006, South Side of South Eleventh Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin), FLOOR PLAN & ELEVATIONS, PLAN NUMBER 700-462 - Fort McCoy, Building No. T-1027, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS & DETAILS, PLAN NUMBER 800-1531 - Fort McCoy, Building No. T-1005, South Side of South Eleventh Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of drawing (this photograph is an 8" x 10" ...
Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1989 original architectural drawing located at Building No. 458, NAS Pensacola, Florida) Renovation and revised office layout, Building No. 45, third floor, architectural floor plans, details and schedules, Sheet 1 of 3 - U.S. Naval Air Station, Equipment Shops & Offices, 206 South Avenue, Pensacola, Escambia County, FL
Reconstructing the Origin of Helianthus deserticola: Survival and Selection on the Desert Floor
Gross, Briana L.; Kane, Nolan C.; Lexer, Christian; Ludwig, Fulco; Rosenthal, David M.; Donovan, Lisa A.; Rieseberg, Loren H.
2008-01-01
The diploid hybrid species Helianthus deserticola inhabits the desert floor, an extreme environment relative to its parental species Helianthus annuus and Helianthus petiolaris. Adaptation to the desert floor may have occurred via selection acting on transgressive, or extreme, traits in early hybrids between the parental species. We explored this possibility through a field experiment in the hybrid species’ native habitat using H. deserticola, H. annuus, H. petiolaris, and two populations of early-generation (BC2) hybrids between the parental species, which served as proxies for the ancestral genotype of the ancient hybrid species. Character expression was evaluated for each genotypic class. Helianthus deserticola was negatively transgressive for stem diameter, leaf area, and flowering date, and the latter two traits are likely to be advantageous in a desert environment. The BC2 hybrids contained a range of variation that overlapped these transgressive trait means, and an analysis of phenotypic selection revealed that some of the selective pressures on leaf size and flowering date, but not stem diameter, would move the BC2 population toward the H. deserticola phenotype. Thus, H. deserticola may have originated from habitat-mediated directional selection acting on hybrids between H. annuus and H. petiolaris in a desert environment. PMID:15278840
Mydriasis during Orbital Floor Fracture Reconstruction: A Novel Diagnostic and Treatment Algorithm
Yeo, Matthew S.; Al-Mousa, Radwan; Sundar, Gangadhara; Lim, Thiam Chye
2010-01-01
Orbital floor fractures are the most commonly encountered traumatic fractures in the facial skeleton. Mydriasis that is detected during orbital floor fracture reconstruction may cause significant distress to surgeons, as it may be associated with sinister events such as visual loss. It is not an uncommon problem; previous studies have shown the incidence of mydriasis to be 2.1%. The combination of careful preoperative evaluation and planning, as well as specific intraoperative investigations when mydriasis is encountered, can be immensely valuable in allaying surgeons' anxiety during orbital floor fracture reconstruction. In this review article, the authors discuss the common causes of mydriasis and present a novel systematic approach to its diagnostic evaluation devised by our unit that has been successfully implemented since 2008. PMID:22132259
Normark, W.R.; McGann, M.; Sliter, R.W.
2009-01-01
An evaluation of the geologic hazards of the inner California Borderland requires determination of the timing for faulting and mass-movement episodes during the Holocene. Our effort focused on basin slopes and turbidite systems on the basin floors for the area between Santa Barbara and San Diego, California. Dating condensed sections on slopes adjacent to fault zones provides better control on fault history where high-resolution, seismic-reflection data can be used to correlate sediment between the core site and the fault zones. This study reports and interprets 147 radiocarbon dates from 43 U.S. Geological Survey piston cores as well as 11 dates from Ocean Drilling Program Site 1015 on the floor of Santa Monica Basin. One hundred nineteen dates from 39 of the piston cores have not previously been published. Core locations were selected for hazard evaluation, but despite the nonuniform distribution of sample locations, the dates obtained for the late Quaternary deposits are useful for documenting changes in sediment-accumulation rates during the past 30 ka. Cores from basins receiving substantial sediment from rivers, i.e., Santa Monica Basin and the Gulf of Santa Catalina, show a decrease in sediment supply during the middle Holocene, but during the late Holocene after sea level had reached the current highstand condition, rates then increased partly in response to an increase in El Ni??o-Southern Oscillation events during the past 3.5 ka. ?? 2009 The Geological Society of America.
75 FR 14429 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday April 23, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...
75 FR 14429 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., Friday, April 9, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...
75 FR 38087 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday July 30, 2009. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 29995 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., June 18, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS...-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 7568 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday March 12, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-18-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 29995 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, June 4, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-26-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 29995 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday June 25, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-26-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 14429 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday, April 2, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 14429 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday April 30, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-23-10; 11:15 am] BILLING CODE 6351-01-P ...
75 FR 38087 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., July 16, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS...-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 38086 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Friday, July 2, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 7568 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday March 5, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-18-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 29996 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Friday, June 11, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-26-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 38086 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Friday, July 9, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 7568 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday March 26, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-18-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 38087 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Friday July 23, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed...-29-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 4355 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., February 19, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed...-25-10; 4:15 pm] BILLING CODE 6351-01-P ...
ERIC Educational Resources Information Center
Frank, David J.
1998-01-01
Discusses the creation of an effective carpet vacuuming program by combining area usage assessment and vacuuming requirements with a scheduling plan. Also explains vacuum cleaner suction and filtration and how it makes custodian work more efficient. A complementary article discusses creating an effective floor-maintenance plan for resilient…
76 FR 57068 - Board Meeting; Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
..., 9 a.m.-1:30 p.m. PLACE: 901 N. Stuart Street, Tenth Floor, Arlington, Virginia 22203. STATUS: Open... Directors Strategic Planning President and Management Report Communications Strategy Advisory Council Next... Board of Directors Strategic Planning President and Management Report Communications Strategy Advisory...
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FOUNDATION, FRAMING & FLOOR PLANS, PLAN NUMBER 800-1412 - Fort McCoy, Building No. T-1055, South side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR & FRAMING PLANS, PLAN NUMBER 700-1204 - Fort McCoy, Building No. T-1088, Intersection of South Ninth & South Eighth Avenues, Block 10, Sparta, Monroe County, WI
11. Photocopy of War Department drawing (original located at Fort ...
11. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). SECOND FLOOR PLAN, PLAN NUMBER 700-1276 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI
10. Photocopy of War Department drawing (original located at Fort ...
10. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FIRST FLOOR PLAN, PLAN NUMBER 700-1275 - Fort McCoy, Building No. T-101, 400' North of intersection of East & West Headquarters Roads, Sparta, Monroe County, WI
6. Photocopy of War Department drawing (original located at Fort ...
6. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR & CEILING PLANS AND DETAILS, PLAN NUMBER 800-1520 - Fort McCoy, Building No. T-1031, North side of South Tenth Avenue, Block 10, Sparta, Monroe County, WI
Photocopy of War Department drawing (original located at Fort McCoy, ...
Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS, SCHEDULES & DETAILS, PLAN NUMBER 800-1537 - Fort McCoy, Building No. T-1081, North side of South Ninth Avenue, Block 10, Sparta, Monroe County, WI
Photographic copy of plan drawing, Department of the Air Force, ...
Photographic copy of plan drawing, Department of the Air Force, Air Defense Command Directorate of Installations, May 28, 1954, Civil Engineers Office, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. FLOOR PLAN, 826-198-4 - Selfridge Field, Building No. 199, South of George Avenue between Walnut & Birch Streets, Mount Clemens, Macomb County, MI
ERIC Educational Resources Information Center
California State Dept. of Education, Sacramento. Bureau of School Planning.
A floor plan accompanies each of six chronologically arranged schemes for housing educational programs. Scheme A represents the in-line corridor plan whose main characteristics are--(1) double loaded corridors with fixed bearing walls, (2) single window walls providing minimal light and ventilation, and (3) small classrooms with fixed desks and…
Nimura, Fumikazu; Nakasone, Toshiyuki; Matsumoto, Hirofumi; Maruyama, Tessho; Matayoshi, Akira; Maruyama, Nobuyuki; Yoshimi, Naoki; Arasaki, Akira; Nishihara, Kazuhide
2018-05-01
Dedifferentiated liposarcoma (DDLS) has a relatively poor prognosis, however this neoplasm rarely occurs in the head and neck. To date, no definite protocol has been established for the diagnosis and treatment of head and neck DDLS. The present study reports the case of a 69-year-old male patient with DDLS of the oral floor. To the best of our knowledge, this is the first documented case of oral floor DDLS. In addition, this is the first reported case with the development of a second primary malignancy following the treatment of head and neck DDLS. A literature review of 50 cases of head and neck DDLS revealed that preoperative biopsy is not reliable for the diagnosis of these tumors and an accurate pathological diagnosis with total resection is preferred.
Nimura, Fumikazu; Nakasone, Toshiyuki; Matsumoto, Hirofumi; Maruyama, Tessho; Matayoshi, Akira; Maruyama, Nobuyuki; Yoshimi, Naoki; Arasaki, Akira; Nishihara, Kazuhide
2018-01-01
Dedifferentiated liposarcoma (DDLS) has a relatively poor prognosis, however this neoplasm rarely occurs in the head and neck. To date, no definite protocol has been established for the diagnosis and treatment of head and neck DDLS. The present study reports the case of a 69-year-old male patient with DDLS of the oral floor. To the best of our knowledge, this is the first documented case of oral floor DDLS. In addition, this is the first reported case with the development of a second primary malignancy following the treatment of head and neck DDLS. A literature review of 50 cases of head and neck DDLS revealed that preoperative biopsy is not reliable for the diagnosis of these tumors and an accurate pathological diagnosis with total resection is preferred. PMID:29740489
29 CFR 4006.5 - Exemptions and special rules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...
29 CFR 4006.5 - Exemptions and special rules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...
29 CFR 4006.5 - Exemptions and special rules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...
29 CFR 4006.5 - Exemptions and special rules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the last day of the prior plan year. (d) Participant count date; new and newly-covered plans. The participant count date of a new plan or a newly-covered plan for a plan year is the first day of the plan year. For this purpose, a new plan's first plan year begins on the plan's effective date. (e) Participant...
Charlton, Kimberly; Kumar, Saravana
2017-01-01
Objective Despite consistent evidence for the positive impact of contingency planning for falls in older people, implementation of plans often fail. This is likely due to lack of recognition and knowledge about perspectives of older people about contingency planning. The objective of this research was to explore the perspectives of older people living in the community about use of contingency planning for getting help quickly after a fall. Method A systematic literature search seeking qualitative research was conducted in April 2014, with no limit placed on date of publication. Medline, EMBASE, Ageline, CINAHL, HealthSource- Nursing/Academic Edition, AMED and Psych INFO databases were searched. Three main concepts were explored and linked using Boolean operators; older people, falls and contingency planning. The search was updated until February 2016 with no new articles found. After removal of duplicates, 562 articles were assessed against inclusion and exclusion criteria resulting in six studies for the meta-synthesis. These studies were critically appraised using the McMaster critical appraisal tool. Bespoke data extraction sheets were developed and a meta-synthesis approach was adopted to extract and synthesise findings. Findings Three themes of ‘a mix of attitudes’, ‘careful deliberations’ and ‘a source of anxiety’ were established. Perspectives of older people were on a continuum between regarding contingency plans as necessary and not necessary. Levels of engagement with the contingency planning process seemed associated with acceptance of their risk of falling and their familiarity with available contingency planning strategies. Conclusion Avoiding a long lie on the floor following a fall is imperative for older people in the community but there is a lack of knowledge about contingency planning for falls. This meta-synthesis provides new insights into this area of health service delivery and highlights that implementation of plans needs to be directed by the older people rather than the health professionals. PMID:28562596
Charlton, Kimberly; Murray, Carolyn M; Kumar, Saravana
2017-01-01
Despite consistent evidence for the positive impact of contingency planning for falls in older people, implementation of plans often fail. This is likely due to lack of recognition and knowledge about perspectives of older people about contingency planning. The objective of this research was to explore the perspectives of older people living in the community about use of contingency planning for getting help quickly after a fall. A systematic literature search seeking qualitative research was conducted in April 2014, with no limit placed on date of publication. Medline, EMBASE, Ageline, CINAHL, HealthSource- Nursing/Academic Edition, AMED and Psych INFO databases were searched. Three main concepts were explored and linked using Boolean operators; older people, falls and contingency planning. The search was updated until February 2016 with no new articles found. After removal of duplicates, 562 articles were assessed against inclusion and exclusion criteria resulting in six studies for the meta-synthesis. These studies were critically appraised using the McMaster critical appraisal tool. Bespoke data extraction sheets were developed and a meta-synthesis approach was adopted to extract and synthesise findings. Three themes of 'a mix of attitudes', 'careful deliberations' and 'a source of anxiety' were established. Perspectives of older people were on a continuum between regarding contingency plans as necessary and not necessary. Levels of engagement with the contingency planning process seemed associated with acceptance of their risk of falling and their familiarity with available contingency planning strategies. Avoiding a long lie on the floor following a fall is imperative for older people in the community but there is a lack of knowledge about contingency planning for falls. This meta-synthesis provides new insights into this area of health service delivery and highlights that implementation of plans needs to be directed by the older people rather than the health professionals.
HEALTH AND SAFETY BUILDING, TRA667. SOUTH AND WEST ELEVATIONS. FLOOR ...
HEALTH AND SAFETY BUILDING, TRA-667. SOUTH AND WEST ELEVATIONS. FLOOR PLAN AND ROOM DESIGNATIONS. NOTE PAIR OF ENTRY DOORS IN WEST ELEVATION FOR MEN AND WOMEN. CONCRETE T-BEAMS. F.C. TORKELSON CO. 842-MTR-667-A1, 1/1963. INL INDEX NO. 531-0667-00-851-151143, REV. 4. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Collaborative Manufacturing Management in Networked Supply Chains
NASA Astrophysics Data System (ADS)
Pouly, Michel; Naciri, Souleiman; Berthold, Sébastien
ERP systems provide information management and analysis to industrial companies and support their planning activities. They are currently mostly based on theoretical values (averages) of parameters and not on the actual, real shop floor data, leading to disturbance of the planning algorithms. On the other hand, sharing data between manufacturers, suppliers and customers becomes very important to ensure reactivity towards markets variability. This paper proposes software solutions to address these requirements and methods to automatically capture the necessary corresponding shop floor information. In order to share data produced by different legacy systems along the collaborative networked supply chain, we propose to use the Generic Product Model developed by Hitachi to extract, translate and store heterogeneous ERP data.
First floor plan. (Also includes a door schedule and door ...
First floor plan. (Also includes a door schedule and door elevations). March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 12, approved March 1962; specifications no. OCI-62-66; D.O. series AW 1596/12, Rev. "C"; file drawer 1290. Last revised 25 August 1975. Scale one-eighth inch to one foot. 28.5x 41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
A Case Study of the United States Navy’s Enterprise Resource Planning System
2006-06-01
incarnations, MRP-II added the capabilities of shop-floor management and distribution management activities. Later versions included the ability to manage ... finances , human resources, engineering, and project management. Enterprise Resource Planning systems were then developed as an integrated system
4. Photocopy of War Department drawing (original located at Fort ...
4. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin). FLOOR PLANS, PLAN NUMBER 800-1487 - Fort McCoy, Building No. T-1056, Southwest of intersection of South Tenth Avenue & South "X" Street, Block 10, Sparta, Monroe County, WI
3. Photocopy of War Department drawing (original located at Fort ...
3. Photocopy of War Department drawing (original located at Fort McCoy, Wisconsin) FLOOR PLAN, PLAN NUMBER 800-1424 - Fort McCoy, Building No. T-1065, Northeast of Intersection of South Ninth Avenue & South "Y" Street, Block 10, Sparta, Monroe County, WI
11. Photocopy of Sheet 3 of Building Plan R451, (USDA, ...
11. Photocopy of Sheet 3 of Building Plan R4-51, (USDA, Forest Service, Intermountain Region, Ogden. File 7300, 'Buildings'.) Construction Details and Floor Framing. - Buffalo Guard Station, Office, U.S. Highway 20/191 at Buffalo River, Island Park, Fremont County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-07
... list of the exhibit objects, contact Paul W. Manning, Attorney-Adviser, Office of the Legal Adviser, U..., SA-5, L/PD, Fifth Floor (Suite 5H03), Washington, DC 20522-0505. Dated: January 4, 2010. Maura M...
75 FR 7568 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-22
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 2 p.m., Wednesday March 17, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS... Filed 2-18-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 4356 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 11 a.m., Friday, February 12, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS... Filed 1-25-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 51016 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Time and Date: 11 a.m., Tuesday, August 31, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS... Filed 8-16-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 14429 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-25
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 2 p.m., Wednesday, April 21, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status... Filed 3-23-10; 11:15 am] BILLING CODE 6351-01-P ...
75 FR 38087 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-01
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 2 p.m., Wednesday, July 21, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS... Filed 6-29-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 4356 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 2 p.m., Wednesday, February 17, 2010. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS... Filed 1-25-10; 4:15 pm] BILLING CODE 6351-01-P ...
75 FR 8720 - Ocean Transportation Intermediary License Revocations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
.... 74th Ave., Suite 13 & 14, Medley, FL 33166. Date Revoked: January 4, 2010. Reason: Failed to maintain a.... Reason: Surrendered license voluntarily. License Number: 739F. Name: Charles A. Redden, Inc. Address: 1609 Vauxhall Road, Second Floor, Union, NJ 07083. [[Page 8721
77 FR 64108 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY: Commodity Futures Trading Commission. TIME AND DATE: 10:00 a.m., Friday, November 2, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and...
Predictors of dyadic planning: Perspectives of prostate cancer survivors and their partners.
Keller, Jan; Wiedemann, Amelie U; Hohl, Diana Hilda; Scholz, Urte; Burkert, Silke; Schrader, Mark; Knoll, Nina
2017-02-01
Extending individual planning of health behaviour change to the level of the dyad, dyadic planning refers to a target person and a planning partner jointly planning the target person's health behaviour change. To date, predictors of dyadic planning have not been systematically investigated. Integrating cognitive predictors of individual planning with four established predictor domains of social support provision, we propose a framework of predictors of dyadic planning. Including target persons' and partners' perspectives, we examine these predictor domains in the context of prostate cancer patients' rehabilitative pelvic floor exercise (PFE) following radical prostatectomy. Longitudinal data from 175 patients and their partners were analysed in a study with four post-surgery assessments across 6 months. PFE-related dyadic planning was assessed from both partners together with indicators from four predictor domains: context, target person, partner, and relationship factors. Individual planning and social support served as covariates. Findings from two-level models nesting repeated assessments in individuals showed that context (patients' incontinence), target person (i.e., positive affect and self-efficacy), and relationship factors (i.e., relationship satisfaction) were uniquely associated with dyadic planning, whereas partner factors (i.e., positive and negative affects) were not. Factors predicting patients' and partners' accounts of dyadic planning differed. Resembling prior findings on antecedents of support provision in this context, partner factors did not prevail as unique predictors of dyadic planning, whereas indicators from all other predictor domains did. To establish predictive direction, future work should use lagged predictions with shorter intermeasurement intervals. Statement of contribution What is already known on this subject? Dyadic planning has been shown to be linked to health behaviour change. However, its role in behaviour regulation frameworks is not well investigated, especially regarding factors that might be predictive of dyadic planning. What does this study add? A framework of predictors of dyadic planning in the health behaviour change process is presented. The framework is investigated accounting for both planning partners' perspectives. Context, target person, and relationship factors were related to dyadic planning. © 2016 The British Psychological Society.
Guidelines for Interpretive Building Design.
ERIC Educational Resources Information Center
Manly, Richard J., Ed.
This booklet is intended to assist those planning nature centers to choose building designs appropriate for intended purposes. The publication presents a set of general interpretive building-site and design considerations compiled over years of experience in nature center design. These generalizations are complemented by examples of floor plans,…
42 CFR 430.20 - Effective dates of State plans and plan amendments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 4 2010-10-01 2010-10-01 false Effective dates of State plans and plan amendments... State Plans § 430.20 Effective dates of State plans and plan amendments. For purposes of FFP, the... first day of the quarter in which an approvable plan is submitted to the regional office; and (2) With...
42 CFR 430.20 - Effective dates of State plans and plan amendments.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 4 2012-10-01 2012-10-01 false Effective dates of State plans and plan amendments... State Plans § 430.20 Effective dates of State plans and plan amendments. For purposes of FFP, the... first day of the quarter in which an approvable plan is submitted to the regional office; and (2) With...
42 CFR 430.20 - Effective dates of State plans and plan amendments.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 4 2014-10-01 2014-10-01 false Effective dates of State plans and plan amendments... State Plans § 430.20 Effective dates of State plans and plan amendments. For purposes of FFP, the... first day of the quarter in which an approvable plan is submitted to the regional office; and (2) With...
42 CFR 430.20 - Effective dates of State plans and plan amendments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 4 2011-10-01 2011-10-01 false Effective dates of State plans and plan amendments... State Plans § 430.20 Effective dates of State plans and plan amendments. For purposes of FFP, the... first day of the quarter in which an approvable plan is submitted to the regional office; and (2) With...
42 CFR 430.20 - Effective dates of State plans and plan amendments.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 4 2013-10-01 2013-10-01 false Effective dates of State plans and plan amendments... State Plans § 430.20 Effective dates of State plans and plan amendments. For purposes of FFP, the... first day of the quarter in which an approvable plan is submitted to the regional office; and (2) With...
Photocopy of drawing (this photograph is an 8" x 10" ...
Photocopy of drawing (this photograph is an 8" x 10" copy of an 8" x 10" negative; 1975 architectural drawing located at NAS Pensacola, Florida, Building No. 458) MECHANICAL PLAN, ELECTRICAL PLAN, FLOOR PLAN AND DETAILS FOR ALTERATIONS TO BUILDING NO. 322, SHEET 1 OF 1. - U.S. Naval Air Station, YMCA Building, West Avenue, Pensacola, Escambia County, FL
Pedestrian mobile mapping system for indoor environments based on MEMS IMU and range camera
NASA Astrophysics Data System (ADS)
Haala, N.; Fritsch, D.; Peter, M.; Khosravani, A. M.
2011-12-01
This paper describes an approach for the modeling of building interiors based on a mobile device, which integrates modules for pedestrian navigation and low-cost 3D data collection. Personal navigation is realized by a foot mounted low cost MEMS IMU, while 3D data capture for subsequent indoor modeling uses a low cost range camera, which was originally developed for gaming applications. Both steps, navigation and modeling, are supported by additional information as provided from the automatic interpretation of evacuation plans. Such emergency plans are compulsory for public buildings in a number of countries. They consist of an approximate floor plan, the current position and escape routes. Additionally, semantic information like stairs, elevators or the floor number is available. After the user has captured an image of such a floor plan, this information is made explicit again by an automatic raster-to-vector-conversion. The resulting coarse indoor model then provides constraints at stairs or building walls, which restrict the potential movement of the user. This information is then used to support pedestrian navigation by eliminating drift effects of the used low-cost sensor system. The approximate indoor building model additionally provides a priori information during subsequent indoor modeling. Within this process, the low cost range camera Kinect is used for the collection of multiple 3D point clouds, which are aligned by a suitable matching step and then further analyzed to refine the coarse building model.
13. Photocopy of 1920 drawing titled: BUILDING 78, 3RD FLOOR ...
13. Photocopy of 1920 drawing titled: BUILDING 78, 3RD FLOOR BALCONY AND FIRE ESCAPES, including plans for skylight and North Elevation. HABS photograph is an 8x10' contact print made from a high contrast negative of an enlargement made from microfiche. Original is in the collection of Department of Public Works, Puget Sound Naval Shipyard, Bremerton, WA. - Puget Sound Naval Shipyard, Administration Building, Farragut Avenue, Bremerton, Kitsap County, WA
76 FR 19774 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... FEDERAL MARITIME COMMISSION Sunshine Act Meeting AGENCY HOLDING THE MEETING: Federal Maritime Commission. TIME AND DATE: April 13, 2011--10 a.m. PLACE: 800 North Capitol Street, NW., First Floor Hearing... on Situation at the Fukushima Nuclear Power Plant in Japan. 2. Staff Review and Recommendation...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-05
..., including a list of the exhibit objects, contact Paul W. Manning, Attorney-Adviser, Office of the Legal... State, SA-5, L/PD, Fifth Floor (Suite 5H03), Washington, DC 20522-0505. Dated: March 26, 2010. Maura M...
Code of Federal Regulations, 2011 CFR
2011-04-01
... date that they are accrued; (B) Interest receivable, floor brokerage receivable, commissions receivable from other brokers or dealers (other than syndicate profits), mutual fund concessions receivable and management fees receivable from registered investment companies and commodity pools: Provided, Such...
Code of Federal Regulations, 2014 CFR
2014-04-01
... date that they are accrued; (B) Interest receivable, floor brokerage receivable, commissions receivable from other brokers or dealers (other than syndicate profits), mutual fund concessions receivable and management fees receivable from registered investment companies and commodity pools: Provided, Such...
Code of Federal Regulations, 2012 CFR
2012-04-01
... date that they are accrued; (B) Interest receivable, floor brokerage receivable, commissions receivable from other brokers or dealers (other than syndicate profits), mutual fund concessions receivable and management fees receivable from registered investment companies and commodity pools: Provided, Such...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
..., et seq.), Delegation of Authority No. 234 of October 1, 1999, and Delegation of Authority No. 236-3... State, SA-5, L/PD, Fifth Floor (Suite 5H03), Washington, DC 20522-0505. Dated: August 15, 2011. J. Adam...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-18
... October 1, 1999, and Delegation of Authority No. 236-3 of August 28, 2000, I hereby determine that the... State, SA-5, L/PD, Fifth Floor (Suite 5H03), Washington, DC 20522-0505. Dated: October 11, 2013. Evan M...
78 FR 31520 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 10:00 a.m., Friday, June 7, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 31520 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 10:00 a.m., Friday, June 28, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 13028 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Agency Holding the Meeting: Commodity Futures Trading Commission. Time and Date: 10:00 a.m., Friday, March 1, 2013. Place: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance...
78 FR 50041 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 10:00 a.m., Friday, September 13, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
76 FR 28425 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-17
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday June 10, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and Enforcement Matters. CONTACT PERSON FOR MORE INFORMATION...
78 FR 31520 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 10:00 a.m., Friday, June 14, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 31520 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-24
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting TIME AND DATE: 10:00 a.m., Friday, June 21, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 50041 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 10:00 a.m., Friday, September 20, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 50041 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 10:00 a.m., Friday, September 6, 2013. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance, Examinations, and Enforcement Matters. In the event that...
78 FR 13028 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Agency Holding the Meeting: Commodity Futures Trading Commission. Time and Date: 10:00 a.m., Friday, March 15, 2013. Place : 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance...
78 FR 2397 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
... EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Sunshine Act Notice AGENCY HOLDING THE MEETING: Equal Employment Opportunity Commission. DATE AND TIME: Wednesday, January 16, 2013, 9:30 a.m. Eastern Time. PLACE: Commission Meeting Room on the First Floor of the EEOC Office Building, 131 ``M'' Street NE., Washington, DC...
78 FR 16501 - Sunshine Act Meeting Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... EQUAL EMPLOYMENT OPPORTUNITY COMMISSION Sunshine Act Meeting Notice AGENCY: Equal Employment Opportunity Commission. DATE AND TIME: Wednesday, March 20, 2013, 9:50 a.m. Eastern Time. PLACE: Commission Meeting Room on the First Floor of the EEOC Office Building, 131 ``M'' Street NE., Washington, DC 20507...
75 FR 21246 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., Friday, May 28, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance Matters. Contact Person for More Information: Sauntia S. Warfield...
75 FR 22391 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-28
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings Agency Holding the Meeting: Commodity Futures Trading Commission. Time and Date: 11 a.m., Wednesday, May 12, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters To Be Considered: Rule...
76 FR 24464 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, May 13, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and Enforcement Matters. CONTACT PERSON FOR MORE INFORMATION...
77 FR 25148 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 10 a.m., Friday, May 11, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance...
75 FR 21246 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 2 p.m., Wednesday, May 19, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Enforcement Matters. Contact Person for More Information: Sauntia S. Warfield...
77 FR 25148 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 10 a.m., Friday, May 18, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance...
76 FR 24463 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, May 6, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and Enforcement Matters. CONTACT PERSON FOR MORE INFORMATION...
75 FR 21246 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., Friday May 7, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance Matters. Contact Person for More Information: Sauntia S. Warfield...
77 FR 25148 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 10:00 a.m., Friday, May 4, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance...
76 FR 24463 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 11 a.m., Friday, May 27, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and Enforcement Matters. CONTACT PERSON FOR MORE INFORMATION...
75 FR 21246 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meeting Time and Date: 11 a.m., Friday, May 14, 2010. Place: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. Status: Closed. Matters to be Considered: Surveillance Matters. Contact Person for More Information: Sauntia S. Warfield...
77 FR 25148 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 10:00 a.m., Friday May 25, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance...
77 FR 54903 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-06
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings AGENCY HOLDING THE MEETING: Commodity Futures Trading Commission. TIME AND DATE: 10 a.m., Friday October 5, 2012. PLACE: 1155 21st St. NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance...
76 FR 72179 - Sunshine Act Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... COMMODITY FUTURES TRADING COMMISSION Sunshine Act Meetings TIME AND DATE: 10 a.m., Friday, December 23, 2011. PLACE: 1155 21st St., NW., Washington, DC, 9th Floor Commission Conference Room. STATUS: Closed. MATTERS TO BE CONSIDERED: Surveillance and Enforcement Matters. In the event [[Page 72180