2. VIEW OF WEST FACE OF LAUNCH OPERATIONS BUILDING. BUNKER ...
2. VIEW OF WEST FACE OF LAUNCH OPERATIONS BUILDING. BUNKER PERISCOPE VISIBLE ON NORTH END OF ROOF. ESCAPE TUNNEL AND CABLE SHED VISIBLE ON NORTH FACE. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
4. VIEW OF CABLE SHED AND CABLE TRAY EMANATING FROM ...
4. VIEW OF CABLE SHED AND CABLE TRAY EMANATING FROM NORTH FACE OF LAUNCH OPERATIONS BUILDING. TOPS OF BUNKER PERISCOPE AND FLAGPOLE ON ROOF OF LAUNCH OPERATIONS BUILDING IN BACKGROUND - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Building 1204, oblique view to east, 90 mm lens. ...
Building 1204, oblique view to east, 90 mm lens. - Travis Air Force Base, Squadron Operations & Readiness Crew Facility, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Building 1204, oblique view to west, 135 mm lens. ...
Building 1204, oblique view to west, 135 mm lens. - Travis Air Force Base, Squadron Operations & Readiness Crew Facility, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
2016-12-01
Svendsen 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Postgraduate School Monterey, CA 93943-5000 8. PERFORMING ORGANIZATION REPORT...operations forces should be fully integrated across doctrine, organization , and technology, and predominantly advise, mentor, and train local forces. With...stability operations. This capstone makes additional recommendations related to doctrine, organization , and technology, as well as education and
6. Interior, rear offices: operations assistant office looking north toward ...
6. Interior, rear offices: operations assistant office looking north toward security operations officer's office. - Ellsworth Air Force Base, Rushmore Air Force Station, Security Central Control Building, Quesada Drive, Blackhawk, Meade County, SD
11. SAC command center, main operations area, underground structure, building ...
11. SAC command center, main operations area, underground structure, building 501, undated - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Command Center, 901 SAC Boulevard, Bellevue, Sarpy County, NE
9. SAC command center, main operations area, underground structure, building ...
9. SAC command center, main operations area, underground structure, building 501, undated - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Command Center, 901 SAC Boulevard, Bellevue, Sarpy County, NE
10. SAC command center, main operations area, underground structure, building ...
10. SAC command center, main operations area, underground structure, building 501, circa 1980 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Command Center, 901 SAC Boulevard, Bellevue, Sarpy County, NE
12. SAC command center, main operations area, underground structure, building ...
12. SAC command center, main operations area, underground structure, building 501, circa 1960 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Command Center, 901 SAC Boulevard, Bellevue, Sarpy County, NE
GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM RIGHT TO LEFT, ...
GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM RIGHT TO LEFT, PETROLEUM OPERATIONS BUILDING (BUILDING, 2840), SECURITY POLICE CENTRAL CONTROL BUILDING (BUILDING 2841). MAINTENANCE DOCK (BUILDING 2837) AND MAINTENANCE DOCK (BUILDING 2890). VIEW TO NORTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
Building the Future Air Force: Analysis of Platform versus Weapon Development
2016-05-26
Operation Desert Storm, GulfWar. 16. SECURITY CLASSIFICATION OF: a. REPORT b. ABSTRACT c. THIS PAGE u u u 17. LIMITATION OF 18. NUMBER...More Surprises: The Vietnam War ...................................................................... 20 The Right Tools for the Job: Operation Desert...require flexibility amongst military forces. The more flexible the force, the more effective at fulfilling policy requirements. “ Operational mission
3. VIEW OF ESCAPE TUNNEL IN NORTH FACE OF LAUNCH ...
3. VIEW OF ESCAPE TUNNEL IN NORTH FACE OF LAUNCH OPERATIONS BUILDING. BUNKER PERISCOPE VISIBLE ABOVE RIGHT CORNER OF TUNNEL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Utility Building Plan, elevations and sections. March Air Force Base, ...
Utility Building Plan, elevations and sections. March Air Force Base, Riverside, California, COmbat Operations Center, Utility Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 57, approved March, 1962; specifications no. ENG-04-353-62-66; D.O. series AW 1596/57, Rev. "B"; file drawer 1290. Last revised 3 October 1966 "drawings updated." Various scales. 29 x 41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Utility Building, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
5. VIEW OF CABLE SHED AND CABLE TRAY EMANATING FROM ...
5. VIEW OF CABLE SHED AND CABLE TRAY EMANATING FROM SOUTH FACE OF LAUNCH OPERATIONS BUILDING. MICROWAVE DISH IN FOREGROUND. METEOROLOGICAL TOWER IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Joint Capabilities for Post-Conflict Operations
2004-05-01
Political Geography (NY: John Wiley & Sons, 1989), 37. 2 Karin von Hippel , “Democracy by Force: A Renewed Commitment to Nation Building,” The...fear. Democratic states are vital to international security. In an article adapted from her book, Democracy by Force, Karin von Hippel , a civil...Parameters 33 (Autumn 2003) 101. 5 Karin von Hippel , “Democracy by Force: A Renewed Commitment to Nation Building,” The Washington Quarterly 23 (Winter
6. INTERIOR OF THE MAIN EQUIPMENT ROOM, AN/FPS66 ALPHA, BUILDING ...
6. INTERIOR OF THE MAIN EQUIPMENT ROOM, AN/FPS66 ALPHA, BUILDING 408, LOOKING WEST. - Mill Valley Air Force Station, Operations Building & Annex, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA
Interior detail, building 810, view to south showing operable door ...
Interior detail, building 810, view to south showing operable door sections to allow closure around aircraft fuselage section, 135 mm lens plus electronic flash lightening. - Travis Air Force Base, B-36 Hangar, Between Woodskill Avenue & Ellis, adjacent to Taxiway V & W, Fairfield, Solano County, CA
115. Photocopy of drawing (1964 architectural drawing by Koebig & ...
115. Photocopy of drawing (1964 architectural drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING, POINT ARGUELLO LAUNCH COMPLEX ONE, SECTIONS AND ELEVATIONS, SHEET A-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
113. Photocopy of drawing (1964 civil engineering drawing by Koebig ...
113. Photocopy of drawing (1964 civil engineering drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING, POINT ARGUELLO LAUNCH COMPLEX ONE, GRADING AND UTILITY PLAN, SHEET C3 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
116. Photocopy of drawing (1964 mechanical drawing by Koebig & ...
116. Photocopy of drawing (1964 mechanical drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING, POINT ARGUELLO LAUNCH COMPLEX ONE, FLOW SHEET 1 AND PIPING PLANS, SHEET M-2 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
117. Photocopy of drawing (1964 mechanical drawing by Koebig & ...
117. Photocopy of drawing (1964 mechanical drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING; POINT ARGUELLO LAUNCH COMPLEX ONE; ABBREVIATIONS, SYMBOLS, AND SCHEDULES; SHEET M-1 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
114. Photocopy of drawing (1964 architectural drawing by Koebig & ...
114. Photocopy of drawing (1964 architectural drawing by Koebig & Koebig Inc.) ADDITION TO LAUNCH OPERATIONS BUILDING; POINT ARGUELLO LAUNCH COMPLEX ONE; FLOOR PLANS, SECTIONS, AND DETAILS; SHEET A-1 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
2. AERIAL VIEW OF SLC3 FROM THE NORTH. SLC3W IN ...
2. AERIAL VIEW OF SLC-3 FROM THE NORTH. SLC-3W IN FOREGROUND; SLC-3E IN BACKGROUND. LAUNCH OPERATIONS BUILDING (LOB; BLDG. 763) AND CABLE TRAYS BETWEEN LOB AND THE PADS VISIBLE IMMEDIATELY EAST (LEFT) OF THE PADS. VEHICLE SUPPORT BUILDING (BLDG. 766) LOCATED EAST OF ROAD IN LEFT FOREGROUND. TECHNICAL SUPPORT BUILDING (BLDG. 762/762A) AND SLC-3 AIR FORCE BUILDING (BLDG. 761) VISIBLE EAST OF LOG IN LEFT BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Photographic copy of foundation plans for Administration Building (T50), Operations ...
Photographic copy of foundation plans for Administration Building (T-50), Operations Building (T-42), and Inflammable Storage Building (T-57): Taylor & Barnes, Architects & Engineers, 803 W. Third Street, Los Angeles California, O.C.E. Office of Civil Engineer Job No. A(9-10), Military Construction: Materiel Command Flight Test Base, Muroc, California, Hangar and Auxiliary Buildings: Administration Bldg Type OB-H-T, Operations Bldg Type OB-A-T, Inflammable Storage Bldg. Type WHSE 1-A (Mod.) Foundation Plans, Sheet No. 35 of 38, March 1944. Reproduced from the holdings of the National Archives, Pacific Southwest Region - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
2011-12-01
move in the right direction towards building expertise back into the force, however, the pendulum must continue to swing toward specialization in...outweigh the drawbacks . Access to the operational squadrons, the weapons platforms, and the actual working spaces, among others, are critical to
119. Photocopy of drawing (1959 civil engineering drawing by the ...
119. Photocopy of drawing (1959 civil engineering drawing by the Ralph M. Parsons Company) PLOT PLAN AND PROFILE LINES OF WAVE GUIDE ENCLOSURE AND CABLE TRAY INSTALLATION FOR LAUNCH OPERATIONS BUILDING, SHEET C41 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
120. Photocopy of drawing (1958 civil engineering drawing by the ...
120. Photocopy of drawing (1958 civil engineering drawing by the Ralph M. Parsons Company) STRUCTURAL DETAILS OF WAVE GUIDE ENCLOSURE AND CABLE TRAY INSTALLATION FOR LAUNCH OPERATIONS BUILDING, SHEET C42 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
8. INTERIOR NORTHWEST VIEW OF TOWER (1992). WrightPatterson Air ...
8. INTERIOR NORTHWEST VIEW OF TOWER (1992). - Wright-Patterson Air Force Base, Area B, Building 8, Operations & Flight Test Building, Northeast corner of Tenth & C Streets, Dayton, Montgomery County, OH
9. INTERIOR SOUTHEAST VIEW OF TOWER (1992). WrightPatterson Air ...
9. INTERIOR SOUTHEAST VIEW OF TOWER (1992). - Wright-Patterson Air Force Base, Area B, Building 8, Operations & Flight Test Building, Northeast corner of Tenth & C Streets, Dayton, Montgomery County, OH
2014-05-22
forces supporting Operation Enduring Freedom- Philippines operate under the Kapit Bisig Framework, a mutually agreed US and Government of the Republic of...within either the Western or Eastern Mindanao Command structures and areas of responsibility. AFP maintenance operations rely heavily upon BDAR64 and...deficiencies found in the Philippine defense structure . The results of the 2003 JDA were devastating. The JDA findings revealed that the AFP was only
Forces associated with pneumatic power screwdriver operation: statics and dynamics.
Lin, Jia-Hua; Radwin, Robert G; Fronczak, Frank J; Richard, Terry G
2003-10-10
The statics and dynamics of pneumatic power screwdriver operation were investigated in the context of predicting forces acting against the human operator. A static force model is described in the paper, based on tool geometry, mass, orientation in space, feed force, torque build up, and stall torque. Three common power hand tool shapes are considered, including pistol grip, right angle, and in-line. The static model estimates handle force needed to support a power nutrunner when it acts against the tightened fastener with a constant torque. A system of equations for static force and moment equilibrium conditions are established, and the resultant handle force (resolved in orthogonal directions) is calculated in matrix form. A dynamic model is formulated to describe pneumatic motor torque build-up characteristics dependent on threaded fastener joint hardness. Six pneumatic tools were tested to validate the deterministic model. The average torque prediction error was 6.6% (SD = 5.4%) and the average handle force prediction error was 6.7% (SD = 6.4%) for a medium-soft threaded fastener joint. The average torque prediction error was 5.2% (SD = 5.3%) and the average handle force prediction error was 3.6% (SD = 3.2%) for a hard threaded fastener joint. Use of these equations for estimating handle forces based on passive mechanical elements representing the human operator is also described. These models together should be useful for considering tool handle force in the selection and design of power screwdrivers, particularly for minimizing handle forces in the prevention of injuries and work related musculoskeletal disorders.
19. DETAIL OF AIR FORCE WEATHER INFORMATION TERMINAL AND CHART ...
19. DETAIL OF AIR FORCE WEATHER INFORMATION TERMINAL AND CHART RECORDER LOCATED IMMEDIATELY NORTH OF CONSOLE IN PHOTOS A-15 THROUGH A-18. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Roof plan, Combat Operations Center, Building No. 2605. (Also includes ...
Roof plan, Combat Operations Center, Building No. 2605. (Also includes a typical roof section, with new fiberglass and urethane insulation layers.) By Federal Builders, 575 Carreon Drive, Colton, California. Sheet 1 of 1, dated 18 May 1992. Scale one-eighth inch to one foot. 24x36 inches. ink on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
2003-10-15
KENNEDY SPACE CENTER, FLA. - Employees file around table displays under a tent near the Operations and Checkout Building. Many vendors and organizations displayed their products during the Spaceport Super Safety and Health Day at KSC and Cape Canaveral Air Force Station, an annual event dedicated to reinforcing safe and healthful behaviors in the workforce.
Building Coalitions for Humanitarian Operations -- Operation Provide Comfort
1992-04-15
When notified of his new appointment, General Shalilkashvili was the Deputy Commander of United States Army Europe (USAREUR). He arrived at the...refugees. EUCOM selected Air Force Major General James L. Jamerson as the commander of JTF-PC. General Jamerson was serving as the Deputy Commander of U.S...located with JTF-PC headquarters. AFFOR was under the command of Air Force Brigadier General James L. Hobson, Jr. The SOF forces were under the
Establishing a Suitable Tactical Design Model for Clear-Hold-Build Counterinsurgency Operations
2009-06-12
Vietnam capitol of Saigon. Cedar Falls was tactically designed to achieve this result through two measures . First, U.S. Army forces would separate...provide a higher force ratio for the operation. This tethering would mitigate risk for the Soldiers themselves. Because risk management is so integrated...Vietnam) BCT Brigade Combat Team BCTP Battle Command Training Program BN Battalion BSP Baghdad Security Plan CF Coalition Forces C-H-B Clear-Hold
Oblique view to south OvertheHorizon Backscatter Radar Network, Mountain ...
Oblique view to south - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
Small Countries’ Special Operations Forces Contribution to the NATO Response Force
2014-06-13
tasks: Military Assistance, Direct Actions and Special Reconnaissance. The Jackal Stone exercise serves as a bedrock designed to build special...operations capabilities and improve interoperability among European partner nations. In Jackal Stone 2012, Army Major General Michael S. Repass, Commander...coalition or NATO operation, and the significance of teaming up with another 48 capable partner.96 Exercise Jackal Stone is an annual event and it is
101. View of transmitter building no. 102, missile warning operation ...
101. View of transmitter building no. 102, missile warning operation center, close up view of DRED (detection radar environmental display) console in operation showing target. Official photograph BMEWS Project by Hansen, 14 March 1963, clear as negative no. A-8803. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
2016-01-01
available at www.jamestown.org: • “PLA Air Force Aviator Recruitment, Education, and Training,” Kenneth W. Allen • “Building a Strong Informatized ...on U.S. Experience .................................................. 34 Defining Integrated Joint Operations: The Role of Informatization and System...75 Petroleum, Oil , and Lubricant Network
Oblique view to the west of two communications antennas ...
Oblique view to the west of two communications antennas - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
View to the northeast of the southwest elevation OvertheHorizon ...
View to the northeast of the southwest elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
Oblique view to the west of the southeast elevation ...
Oblique view to the west of the southeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
Interior view to the southwest of Computer Room 157 ...
Interior view to the southwest of Computer Room 157 - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
View to the northwest of the southeast elevation OvertheHorizon ...
View to the northwest of the southeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
Sections. March Air Force Base, Riverside, California, Combat Operations Center, ...
Sections. March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 14, approved March, 1962; specifications no. ENG-04-353-62-66; D.O. series AW 1596/15, Rev. "A"; file drawer 1290. Last revised 3 October 1966. Scale one-eighth inch to one foot. 30x36 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
The Centurions vs. the Hydra: French Counterinsurgency in the Peninsular War (1808-1812)
2011-06-10
their operational dilemma in different manners. But the analysis also outlined a common denominator to their practices. Leverage of religion , build up...But the analysis also outlined a common denominator to their practices. Leverage of religion , build up of native security forces, and development...armada en los origenese de la Espana liberal, 1808-1823 [Cortes and Military Forces at the Origin of Liberal Spain] (Madrid, Spain: Siglo veintiuno
2009-07-01
including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215...Canaveral Air Force Station (CCAFS) Skid Strip. Since the facility no longer operates as a missile skid strip, it is referred to as the "Airfield...construction of a new 65 foot tall control tower; construction of a new Airfield Manager (AM) Operations Building that would adjoin the new tower; and
Military Engineer Contribution to Operational Art: The Hybrid Threat Environment
2015-05-22
engineering are capabilities and activities that support the maneuver force, to include mobility , countermobility, and survivability tasks.12 These may...effort or “ways” engineers support the pursuit of the operational desired state. The engineer lines of effort (LOE) include assure mobility , enhance...protection, enable force projection and logistics, and building partner capacity and develop infrastructure.16 The assured mobility LOE seeks to
Elevations. March Air Force Base, Riverside, California, Combat Operations Center, ...
Elevations. March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 14, approved March, 1962; specifications no. ENG-04-353-62-66; D.O. series AW 1596/14, Rev. "B"; file drawer 77-1/102. Last revised 3 October 1966. Scale one-eighth inch to one foot. 30x36 inches. photocopy on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR ...
69. DETAIL OF OPERATIONS AND CHECKOUT (POWER CONTROL AND MONITOR PANEL) AND RANGE SAFETY (DESTRUCT SYSTEM CONTROL MONITOR PANEL) PANELS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Oblique view to the northwest detailing four overhead rolling doors ...
Oblique view to the northwest detailing four overhead rolling doors on the northeast elevation - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
26. View of second floor of transmitter building no. 102 ...
26. View of second floor of transmitter building no. 102 looking across electronic equipment cabinets in area of missile impact predictor (MIP) area. Note U.S. Air Force emblem in mid-center of photograph. This area is in front of the Missile Warning Operations Center (MWOC) office. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
Challenges for Civil-Military Integration During Stability Operations
2008-04-10
has propose the establishment of “a standing [Interagency Task Force] IATF headquarters core element that is ready to deploy to an operation on short...notice…[that] would be the foundation for building the rest of an IATF once an operation was anticipated. See Prepared Statement Michèle A. Flournoy
Managing Cyber Operator Training Cirriculum
2010-06-01
people grow their food on it, and people build their communities on it. Its terrain is defined by elevation, features such as forests and desserts ...DEPARTMENT OF THE AIR FORCE AIR UNIVERSITY AIR FORCE INSTITUTE OF TECHNOLOGY Wright-Patterson Air Force Base, Ohio APPROVED FOR PUBLIC RELEASE ...DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release ; distribution unlimited 13. SUPPLEMENTARY NOTES 14. ABSTRACT The purpose of this research
Stand Up and Be Counted: The Continuing Challenge of Building the Iraqi Security Forces
2007-01-01
forces in conjunction with neutralizing Iraq’s insurgency and developing Iraqi forces capable of securing the country . From the fall of 2003...effort to develop the Iraqi Security Forces (ISF), we cannot assess the operational capability of these forces. We are actually left with more...First we trained the army for threats from outside the country . But we realized the true threats were inside the country …. It’s the Iraqis
103. View of transmitter building no. 102, missile warning operation ...
103. View of transmitter building no. 102, missile warning operation center, overall view of center in operation with staff at consoles. Note defcon (defense condition) display panel (upper right) showing "simulated status"activity level. Also note fiber optic display panel at upper right-center. Official photograph BMEWS Project by Hansen 30 September, 1976, clear as negative no. A-14568. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
By, With, and Through: The Theory and Practice of Special Operations Capacity-Building
2014-12-01
The Colombian Military..........................................................94 3. SOCSOUTH ON THE GROUND IN COLOMBIA .......................95...civil affairs operations CCOPE Colombian Joint Special Operations Command (Comando Conjunto de Operaciones Especiales) CERTE Colombian Army...Tactical Retraining Center CF Conventional forces CMO civil-military operations CMSE civil-military support element CNP Colombian National Police CNT
ultimately the United States. Due to its geographical , and multiple international borders, including access to both Atlantic and Pacific littorals...therefore achieving freedom of movement causing further instability throughout the region. Because of that reason , United States has the Counter-Narco
Computer Maintenance Operations Center (CMOC), additional computer support equipment ...
Computer Maintenance Operations Center (CMOC), additional computer support equipment - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
1990-10-31
and ZIP Code) Dept. of Civil Fng. & Oper. Research Building 410 Princeton University Bolling AFB, D.C. 20332-6448 ?rinceton, NJ 08544 i. NAME OF FUNDING...Department of Civil Engineering & Operations Research Princeton University Princeton, N.J. 08544 31 October 1990 Final Technical Report Approved for public...release; Distribution is unlimited. I Prepared for Air Force Office of Scientific Research Building 410 Boiling AFB, D.C. 20332-6448 PREFACE This work
Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170174 computers ...
Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170-174 computers - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
INTERIOR OF SECOND FLOOR AIRFIELD MANAGEMENT SUPERINTENDENT'S OFFICE. VIEW TO ...
INTERIOR OF SECOND FLOOR AIRFIELD MANAGEMENT SUPERINTENDENT'S OFFICE. VIEW TO SOUTHEAST - Plattsburgh Air Force Base, Base Operations Building, Idaho at Alabama Avenue, Plattsburgh, Clinton County, NY
Building An Adaptive Cyber Strategy
2016-06-01
forces. The primary mission of the military in any domain, including cyber , should be readiness to exert force if needed during crisis . AU/ACSC/SMITH...of crisis . The military must be able to AU/ACSC/SMITH, FI/AY16 manipulate the cyber environment, but should avoid direct use of force against...operations focus on maintaining a manageable threat level. Cyberspace is a continually evolving domain, and nations throughout the world can join in cyber
The Erosion of Public Trust: Normalization of Deviance In The Air Force
2016-02-13
to forge, and building a reputation of professionalism and trustworthiness requires significant effort and investment. And, public trust grows ...clearly a special trust between society and the military profession . Normalization of Deviance Now that military professionalism and the special...their armed forces will operate in a competent, professional , and ethical manner. In the case of the United States Air Force, there has been an
Interior view to the south of computer work stations in ...
Interior view to the south of computer work stations in front of elevated work area 1570 on left and elevated glassed in work area 1870 on right - Over-the-Horizon Backscatter Radar Network, Mountain Home Air Force Operations Building, On Desert Street at 9th Avenue Mountain Home Air Force Base, Mountain Home, Elmore County, ID
32. DETAIL OF PRESSURE GAUGE INSTALLED ON BUNKER PERISCOPE IN ...
32. DETAIL OF PRESSURE GAUGE INSTALLED ON BUNKER PERISCOPE IN 1991 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
42. View of CSMR room equipment status board and operators ...
42. View of CSMR room equipment status board and operators console with two phone links to MWOC in transmitter building no. 102. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS ...
66. DETAIL OF LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS IN CONSOLE LOCATED CENTRALLY IN SLC-3E CONTROL ROOM. FROM LEFT TO RIGHT IN BACKGROUND: LAUNCH OPERATOR, LAUNCH ANALYST, AND FACILITIES PANELS. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
General Urban Warfare Amphibious Logistics Applications. Volume 2. Operations Plan.
1983-06-23
measures to degrade or eliminate enemy hostile intelligence or counterintelligence capabilities affecting the efficient conduct of amphibious...networks, and harbor port facilities. If controlled and exploited by enemy agencies, landing force progress and capabilities could be degraded . ECM...control for follow-on forces, and supplementing ATF communications where degraded by buildings within the metropolitan boundary. d. Transgortation S.(1
Tsunami Simulators in Physical Modelling - Concept to Practical Solutions
NASA Astrophysics Data System (ADS)
Chandler, Ian; Allsop, William; Robinson, David; Rossetto, Tiziana; McGovern, David; Todd, David
2017-04-01
Whilst many researchers have conducted simple 'tsunami impact' studies, few engineering tools are available to assess the onshore impacts of tsunami, with no agreed methods available to predict loadings on coastal defences, buildings or related infrastructure. Most previous impact studies have relied upon unrealistic waveforms (solitary or dam-break waves and bores) rather than full-duration tsunami waves, or have used simplified models of nearshore and over-land flows. Over the last 10+ years, pneumatic Tsunami Simulators for the hydraulic laboratory have been developed into an exciting and versatile technology, allowing the forces of real-world tsunami to be reproduced and measured in a laboratory environment for the first time. These devices have been used to model generic elevated and N-wave tsunamis up to and over simple shorelines, and at example coastal defences and infrastructure. They have also reproduced full-duration tsunamis including Mercator 2004 and Tohoku 2011, both at 1:50 scale. Engineering scale models of these tsunamis have measured wave run-up on simple slopes, forces on idealised sea defences, pressures / forces on buildings, and scour at idealised buildings. This presentation will describe how these Tsunami Simulators work, demonstrate how they have generated tsunami waves longer than the facilities within which they operate, and will present research results from three generations of Tsunami Simulators. Highlights of direct importance to natural hazard modellers and coastal engineers include measurements of wave run-up levels, forces on single and multiple buildings and comparison with previous theoretical predictions. Multiple buildings have two malign effects. The density of buildings to flow area (blockage ratio) increases water depths and flow velocities in the 'streets'. But the increased building densities themselves also increase the cost of flow per unit area (both personal and monetary). The most recent study with the Tsunami Simulators therefore focussed on the influence of multiple buildings (up to 4 rows) which showed (for instance) that the greatest forces can act on the landward (not seaward) rows of buildings. Studies in the 70m long, 4m wide main channel of the Fast Flow Facility on tsunami defence structures have also measured forces on buildings in the lee of a failed defence wall and tsunami induced scour. Supporting presentations at this conference: McGovern et al on tsunami induced scour at coastal structures and Foster et al on building loads.
104. VIEW OF CABLE RACEWAY BENEATH REMOVABLE FLOOR PANEL IN ...
104. VIEW OF CABLE RACEWAY BENEATH REMOVABLE FLOOR PANEL IN LANDLINE INSTRUMENTATION ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
48. DETAIL OF REAR OF DEMULTIPLEX PANEL 5 SHOWING COMPONENTS ...
48. DETAIL OF REAR OF DEMULTIPLEX PANEL 5 SHOWING COMPONENTS OF VACUUM-TUBE OSCILLOSCOPE - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
92. VIEW OF CHART RECORDERS AND PERSONAL COMPUTER LINING NORTHEAST ...
92. VIEW OF CHART RECORDERS AND PERSONAL COMPUTER LINING NORTHEAST CORNER OF AUTOPILOT ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Operational Focused Simulation
2009-12-01
selected technologies. In order to build the scenario to fit the vignette, the Theater Battle Management Core System ( TBMCS ) databases were adjusted... TBMCS program provided an automated and integrated capability to plan and execute the air battle plan for the modeling and simulation efforts. TBMCS ...is the operational system of record for the Air and Space Operations Center Weapons System (AOC WS). TBMCS provides the Joint/Combined Forces Air
6. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
6. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHEAST CORNER - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
83. DETAIL OF HONEYWELL AIRCONDITIONING CONTROLS IN SLC3E CONTROL ROOM ...
83. DETAIL OF HONEYWELL AIR-CONDITIONING CONTROLS IN SLC-3E CONTROL ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
6. VIEW OF FIVEFOOT WIND TUNNEL WITH AIR STRAIGHTENER AND ...
6. VIEW OF FIVE-FOOT WIND TUNNEL WITH AIR STRAIGHTENER AND OPERATOR STATION IN FOREGROUND (1991). - Wright-Patterson Air Force Base, Area B, Building No. 19, Five-Foot Wind Tunnel, Dayton, Montgomery County, OH
65. DETAIL OF ASSISTANT LAUNCH CONTROLLER AND LAUNCH CONTROLLER PANELS ...
65. DETAIL OF ASSISTANT LAUNCH CONTROLLER AND LAUNCH CONTROLLER PANELS LOCATED NEAR CENTER OF SLC-3E CONTROL ROOM. NOTE 30-CHANNEL COMMUNICATIONS PANELS. PAYLOAD ENVIRONMENTAL CONTROL AND MONITORING PANELS (LEFT) AND LAUNCH OPERATORS PANEL (RIGHT) IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
2017-05-25
Griffith United States Army School of Advanced Military Studies United States Army Command and General Staff College Fort Leavenworth, Kansas...Seminar Leader COL Philipp F. Leyde ___________________________________, Director, School of Advanced Military Studies James C...considering its history with such advisors in the Philippines War, World War II, Korean War, Vietnam War, El Salvador, Afghanistan, and Iraq. What is new
Building Space Power for the Nation: Air Force Achievements Challenges and Opportunities
2006-01-01
since space capabilities play in planning and con- that time , they have advanced from simply ducting.joint military operations. Space forces proving...collect critical this is a relatively short period of time . Addi- itelligence over dtenied areas, primarily the tionally nnmerous changes in military...novative program management ; cutting-edge grams. Shifts in responsibilities, organization, technical and engineering expertise; rapid, and culture created
Tsunami Simulators in Physical Modelling Laboratories - From Concept to Proven Technique
NASA Astrophysics Data System (ADS)
Allsop, W.; Chandler, I.; Rossetto, T.; McGovern, D.; Petrone, C.; Robinson, D.
2016-12-01
Before 2004, there was little public awareness around Indian Ocean coasts of the potential size and effects of tsunami. Even in 2011, the scale and extent of devastation by the Japan East Coast Tsunami was unexpected. There were very few engineering tools to assess onshore impacts of tsunami, so no agreement on robust methods to predict forces on coastal defences, buildings or related infrastructure. Modelling generally used substantial simplifications of either solitary waves (far too short durations) or dam break (unrealistic and/or uncontrolled wave forms).This presentation will describe research from EPI-centre, HYDRALAB IV, URBANWAVES and CRUST projects over the last 10 years that have developed and refined pneumatic Tsunami Simulators for the hydraulic laboratory. These unique devices have been used to model generic elevated and N-wave tsunamis up to and over simple shorelines, and at example defences. They have reproduced full-duration tsunamis including the Mercator trace from 2004 at 1:50 scale. Engineering scale models subjected to those tsunamis have measured wave run-up on simple slopes, forces on idealised sea defences and pressures / forces on buildings. This presentation will describe how these pneumatic Tsunami Simulators work, demonstrate how they have generated tsunami waves longer than the facility within which they operate, and will highlight research results from the three generations of Tsunami Simulator. Of direct relevance to engineers and modellers will be measurements of wave run-up levels and comparison with theoretical predictions. Recent measurements of forces on individual buildings have been generalized by separate experiments on buildings (up to 4 rows) which show that the greatest forces can act on the landward (not seaward) buildings. Continuing research in the 70m long 4m wide Fast Flow Facility on tsunami defence structures have also measured forces on buildings in the lee of a failed defence wall.
73. VIEW OF LAUNCH OPERATOR AND LAUNCH ANAYLST PANELS LOCATED ...
73. VIEW OF LAUNCH OPERATOR AND LAUNCH ANAYLST PANELS LOCATED NEAR CENTER OF SOUTH WALL OF SLC-3E CONTROL ROOM. FROM LEFT TO RIGHT ON WALL IN BACKGROUND: COMMUNICATIONS HEADSET AND FOOT PEDAL IN FORGROUND. ACCIDENT REPORTING EMERGENCY NOTIFICATION SYSTEM TELEPHONE, ATLAS H FUEL COUNTER, AND DIGITAL COUNTDOWN CLOCK. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schetrit, Oren; Kim, Joyce; Yin, Rongxin
2014-08-01
Automated demand response (Auto-DR) is expected to close the loop between buildings and the grid by providing machine-to-machine communications to curtail loads without the need for human intervention. Hence, it can offer more reliable and repeatable demand response results to the grid than the manual approach and make demand response participation a hassle-free experience for customers. However, many building operators misunderstand Auto-DR and are afraid of losing control over their building operation. To ease the transition from manual to Auto-DR, we designed and implemented granular control of Auto-DR systems so that building operators could modify or opt out of individualmore » load-shed strategies whenever they wanted. This paper reports the research findings from this effort demonstrated through a field study in large commercial buildings located in New York City. We focused on (1) understanding how providing granular control affects building operators’ perspective on Auto-DR, and (2) evaluating the usefulness of granular control by examining their interaction with the Auto-DR user interface during test events. Through trend log analysis, interviews, and surveys, we found that: (1) the opt-out capability during Auto-DR events can remove the feeling of being forced into load curtailments and increase their willingness to adopt Auto-DR; (2) being able to modify individual load-shed strategies allows flexible Auto-DR participation that meets the building’s changing operational requirements; (3) a clear display of automation strategies helps building operators easily identify how Auto-DR is functioning and can build trust in Auto-DR systems.« less
2009-06-01
of the population naturally lend themselves to the systematic use of public affairs and local proxy sources and channels for conveying messages . It...counterinsurgents with regards to the use of information operations? 3. What is the process of nation-building, and what are the roles of the different...conveying a message to the population. It follows that information operations not only can be used effectively in support of other operations, but
Joint Force Quarterly. Issue 53, 2nd Quarter 2009
2009-04-01
WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) National Defense University,260 Fifth Avenue, S.W. ( Building 64, Room 2505),Fort...improve the reader’s professional understand- ing or performance ? Speak to the implications from the operational to the strategic level of influence and...with building nuclear power plants. If this projection is accurate, significant energy dividends resulting from the nuclear agreement are unlikely
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC3W CONTROL ROOM. COMMUNICATIONS ...
11. CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM. COMMUNICATIONS HEADSETS IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Khan, Feroz Hassan; Vannoni, Michael Geoffrey; Rajen, Gaurav
India and Pakistan have created sizeable ballistic missile forces and are continuing to develop and enlarge them. These forces can be both stabilizing (e.g., providing a survivable force for deterrence) and destabilizing (e.g., creating strategic asymmetries). Missile forces will be a factor in bilateral relations for the foreseeable future, so restraint is necessary to curtail their destabilizing effects. Such restraint, however, must develop within an atmosphere of low trust. This report presents a set of political and operational options, both unilateral and bilateral, that decreases tensions, helps rebuild the bilateral relationship, and prepares the ground for future steps in structuralmore » arms control. Significant steps, which build on precedents and do not require extensive cooperation, are possible despite strained relations. The approach is made up of three distinct phases: (1) tension reduction measures, (2) confidence building measures, and (3) arms control agreements. The goal of the first phase is to initiate unilateral steps that are substantive and decrease tensions, establish missiles as a security topic for bilateral discussion, and set precedents for limited bilateral cooperation. The second phase would build confidence by expanding current bilateral security agreements, formalizing bilateral understandings, and beginning discussion of monitoring procedures. The third phase could include bilateral agreements limiting some characteristics of national missile forces including the cooperative incorporation of monitoring and verification.« less
First floor plan. (Also includes a door schedule and door ...
First floor plan. (Also includes a door schedule and door elevations). March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 12, approved March 1962; specifications no. OCI-62-66; D.O. series AW 1596/12, Rev. "C"; file drawer 1290. Last revised 25 August 1975. Scale one-eighth inch to one foot. 28.5x 41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Developing a Cultural Intelligence Capability
2008-12-12
assumptions about how to achieve results vary greatly among key players” (Teachers College, Columbia University n.d.). Operating in a foreign culture...institution building and economic development, among other things.” 9 CHAPTER 2 CONVENTIONAL WISDOM Modern military forces have been transforming...war (OOTW). Among the new competencies identified for leadership in the new operating environment is “cultural awareness” or “cultural competence
Developing Realistic Behaviors in Adversarial Agents for Air Combat Simulation
1993-12-01
34Building Symbolic Primitives with Continuous Control Rou- tines." Proceedings of the 1st International Conference on Aritificial Intelligence Planning...shortcoming is the minimal Air Force participation in this field. 1-1 Some of the artificial intelligence (AI) personnel at the Air Force Institute of... intelligent system that operates in a moderately complex or unpredictable environment must be reactive. In being reactive the intelligent system must
6. Credit USAF, April, 1945. Original in the possession of ...
6. Credit USAF, April, 1945. Original in the possession of Ken G. Oldfield, Laguna Hills, California. View looking west across North Base flightline of XP-80s Shooting Stars undergoing accelerated service tests. HANG-N-A hangars No. 1 (Building 4401) and No. 2 (Building 4402) appear at left of view, with runway control tower (T-65, or Building 4500) at far right. Flight operations offices were in T-42 (Building 4502) at base of control tower; this structure was not extant in 1995. In the background between the control tower and Building 4402 lies T-15, officer's quarters. - Edwards Air Force Base, North Base, North Base Road, Boron, Kern County, CA
Operational Energy Strategy: Implementation Plan
2012-03-01
U.S. forces to obtain the energy required to perform their missions. To achieve this goal, the Department will identify and remediate energy-related...construction projects related to hydropower and biogas to build local capacity in Afghanistan. Responsibilities. The Joint Staff and Military
Case Study: Lackland Air Force Base Commissary
DeCA chose to adopt a NH3/CO2 cascade system for two main reasons: (1) to control future capital and operating costs, and (2) to meet the energy and sustainability goals the U.S. Government has established for all public buildings.
102. VIEW OF GRANETZ 'EVENTRECORDER' COMPUTER AND GENERAL ELECTRIC PRINTERS ...
102. VIEW OF GRANETZ 'EVENT-RECORDER' COMPUTER AND GENERAL ELECTRIC PRINTERS FOR GRANETZ OUTPUT LOCATED NEAR EAST WALL OF LANDLINE INSTRUMENTATION ROOM - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
67. DETAIL OF VIDEO CAMERA CONTROL PANEL LOCATED IMMEDIATELY WEST ...
67. DETAIL OF VIDEO CAMERA CONTROL PANEL LOCATED IMMEDIATELY WEST OF ASSISTANT LAUNCH CONDUCTOR PANEL SHOWN IN CA-133-1-A-66 - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Technical Performance Measures and Distributed-Simulation Training Systems
2000-01-01
and Salas (1995) indicate that “ free play ” training exercises Acquisition Review Quarterly—Winter 2000 24 “The use of both process measures to...performance change from training period to training period, whereas the alternative to “ free play ”—a structured exercise—was expensive to build and...semiautomated-force operators used their “ free play ” prerogative in the second run. Specifically, units typically train against a lesser able opposing force
Building a 600-Ship Navy: Costs, Time, and Alternative Approaches
1982-03-01
distributed-force operations but not currently included in Navy construction plans. These include 12 guided missile aviation cruisers ( CGV ) and 61...guided missile destroyers (DDGY). The CGVs would be equipped With a balanced suite of ship- mounted anti-air, antisubmarine, and antisurface weapons... CGV ) with extensive facilities for supporting V/STOL aircraft. These cruisers would operate with surface action groups and underway replenishment
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE ...
12. DETAIL OF WEST END OF CENTRAL ATLAS CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING LAUNCH CONDUCTOR AND ASSISTANT LAUNCH CONDUCTOR PANELS - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
8. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
8. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS NORTHEAST CORNER. TELEMETRY ROOM VISIBLE THROUGH WINDOWS IN SOUTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
7. VIEW OF SLC3W CONTROL ROOM (ROOM 105) FROM ITS ...
7. VIEW OF SLC-3W CONTROL ROOM (ROOM 105) FROM ITS SOUTHWEST CORNER. NOTE RAISED FLATFORM IN CENTER OF ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Making Our Buildings Safer: Security Management and Equipment Issues.
ERIC Educational Resources Information Center
Clark, James H.
1997-01-01
Discusses three major components of library security: physical security of the environment; operating procedures for library staff, the public, and security personnel; and a contract security force (or campus security in academic institutions.) Topics include risk management; maintenance; appropriate technology, including security systems and…
86. VIEW OF AUTOPILOT ROOM LOOKING WEST FROM CENTER OF ...
86. VIEW OF AUTOPILOT ROOM LOOKING WEST FROM CENTER OF ROOM. IBM PERSONAL COMPUTER FOR SLC-3W AUTOPILOT FUNCTIONS IN SOUTHWEST CORNER (LEFT). - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Building Integrated Photovoltaic Module-Based on Aluminum Substrate With Forced Water Cooling.
Pang, Wei; Zhang, Yongzhe; Cui, Yanan; Yu, Hongwen; Liu, Yu; Yan, Hui
2018-04-01
The increase of operating temperature on a photovoltaic (PV) cell degrades its electrical efficiency. This paper is organized to describe our latest design of an aluminum substrate-based photovoltaic/thermal (PV/T) system. The electrical efficiency of the proposed PV/T can be increased by ∼ 20% in comparison with a conventional glass substrate-based PV. The work will benefit hybrid utilization of solar energy in development of building integrated photovoltaic systems.
This group view shows propellant preparation buidling 4241/E42, 4242/E43, and ...
This group view shows propellant preparation buidling 4241/E-42, 4242/E-43, and northwest (314 degrees). Note warning lights at the extreme left of the view, and the use of lightning rods on structures. Building 4241/E-42 housed solid rocket motors after they were cast and awaiting curing. Building 4241/E-42 was the Preparation Control center which housed remote controls for operations in the other two buildings. Building 4243/E-44 housed a remotely controlled mandrel puller for pulling mandrels (casting cores) from cured grain, and a vertical lathe for trimming grain to shape and size. - Jet Propulsion Laboratory Edwards Facility, Edwards Air Force Base, Boron, Kern County, CA
1986-03-27
many terrorist groups with plastique and other explosives to build bombs. 6 Using these explosives they have produced vehicle bombs which are totally...US Army War College Study, 19 April 1982. 3. TRADOC Pam 525-37, Military Operations, US Army Operational Concept For Terrorism Counteraction, 19...Army (U). Counterintelligence Special Report. (Overall Report (S)), 1981. 30. US Army. TRADOC Pam 525-37. "Military Operations." US Army Concept For
2006-05-05
NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Joint Special Operations University,357 Tully Street...Alison Building,Hurlburt Field,FL,32544 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...leadership. JSOU is a subordinate organization of the US Special Operations Command (USSOCOM), MacDill Air Force Base, Florida. The mission of the Joint
50. DETAIL OF TYPICAL PANELS IN ANALOG RECORD BAY. LEFT ...
50. DETAIL OF TYPICAL PANELS IN ANALOG RECORD BAY. LEFT PANEL CONTAINS OSCILLOGRAPH AND CONTROLS. RIGHT PANEL CONTAINS CATHODE RAY TUBE AND INK-TYPE CHART RECORDER. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
The School Facilities Children Are Forced to Attend.
ERIC Educational Resources Information Center
Hansen, Shirley J.
1993-01-01
As many as 25% of American school buildings are inadequate. However, many districts have reduced maintenance to pay utility bills. An active energy-management program can lower utility costs through efficient operation and maintenance practices and retrofits that pay back in less than three years. (MLF)
ERIC Educational Resources Information Center
Grene, Hanna
2011-01-01
It is no secret that school budgets are growing smaller, forcing districts to make tough financial choices. Building operating costs drain a massive portion of most districts' budgets. As such, energy efficiency is a powerful tool to cut short- and long-term operating costs, and reductions in energy use. The U.S. Environmental Protection Agency's…
2010-07-01
complete, the open area around the Building and new underground electrical supply would be landscaped with native vegetation. The installation would...the AFS range from 1,130 feet above mean sea level in the eastern portion to 1,180 feet in the western part. The regional gradient is to the northeast...recreation, and irrigation. The Pembina River starts in the Turtle Mountains and enters the Red River of the North at Pembina. It drains 1,960
2007-08-16
activities within the area do not significantly adversely or significantly positively impact storm water quality . The Proposed Construction Area does...adversely impact storm water quality . Existing buildings receive limited runoff from the adjacent area to the west; however, no indications of adverse... water quality . Existing buildings receive limited runoff from the adjacent area to the north and west; however, no indications of adverse environmental
Second floor plan. (Also includes a roof plan and finish ...
Second floor plan. (Also includes a roof plan and finish schedule.) March Air Force Base, Riverside, California, Combat Operations Center, Combat Operations Building. By Moffatt and Nichol, Engineers, 122 West Fifth Street, Long Beach, California; for the Corps of Engineers, U.S. Army, Office of the District Engineer, Los Angeles, California. Drawing no. AW-60-02-03, sheet no. 13, approved March, 1962; specifications no. OCI-62-66; D.O. series AW 1596/13, Rev. "C"; file drawer 1290. Last revised 7 February 1984. Roof plan scale one-sixteenth inch to one foot; second floor plan scale one-eighth inch to one foot. 28.75x41 inches. pencil on paper - March Air Force Base, Strategic Air Command, Combat Operations Center, 5220 Riverside Drive, Moreno Valley, Riverside County, CA
Building a Research Administration Infrastructure at the Department Level
ERIC Educational Resources Information Center
Chun, Maria B. J.
2010-01-01
Due to the current economic crisis, research administrators at public universities are grappling with declining state funding and are faced with identifying other potential sources of revenue to support operations. Research administrators at all levels are forced to do more with less. Department level research administrators must be innovative…
91. VIEW OF OBSOLETE AIRCONDITIONING DUCTS LOCATED IN NORTHWEST CORNER ...
91. VIEW OF OBSOLETE AIR-CONDITIONING DUCTS LOCATED IN NORTHWEST CORNER OF ROOM, ABOVE SLC-3E AUTOPILOT EQUIPMENT. DIGITAL COUNTDOWN AND HOLD CLOCKS ON WALL LEFT OF DUCTS - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
82. VIEW OF AIRCONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF ...
82. VIEW OF AIR-CONDITIONING CONTROLS LOCATED IN NORTHEAST CORNER OF SLC-3E CONTROL ROOM. DIAL ON RIGHT (EAST) PERPENDICULAR WALL IS DIMMER FOR ROOM LIGHTING. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
10. PAYLOAD CONTROL CONSOLE NEAR SOUTH WALL OF SLC3W CONTROL ...
10. PAYLOAD CONTROL CONSOLE NEAR SOUTH WALL OF SLC-3W CONTROL ROOM. DECALS ON CONSOLE IN FOREGROUND INDICATE PAYLOAD PROGRAMS LAUNCHED FROM SLC-3W. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
2016-04-04
Centennial , http://navyreservecentennial.com/history/ (accessed November 22, 2015). 13 components they remain subject to the Posse Comitatus Act...Establishment of the United States Navy Reserve.” Navy Reserve Centennial . http://navyreservecentennial.com/history/ (accessed November 22, 2015
18. DETAIL OF NORTH END OF ATLAS CONTROL CONSOLE NEAR ...
18. DETAIL OF NORTH END OF ATLAS CONTROL CONSOLE NEAR WEST WALL OF SLC-3W CONTROL ROOM SHOWING PAYLOAD ENVIRONMENT CONTROL AND MONITORING PANELS (LABELED 'PECMP') - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
16. DETAIL OF SOUTH END OF ATLAS CONTROL CONSOLE NEAR ...
16. DETAIL OF SOUTH END OF ATLAS CONTROL CONSOLE NEAR WEST WALL OF SLC-3W CONTROL ROOM SHOWING CONTROLS FOR STILL CAMERAS POSITIONED AROUND THE LAUNCH PAD - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
9. PAYLOAD CONTROL CONSOLE NEAR EAST WALL OF SLC3W CONTROL ...
9. PAYLOAD CONTROL CONSOLE NEAR EAST WALL OF SLC-3W CONTROL ROOM. PAYLOAD CONTROLS INSTALLED IN CONSOLE BY THE PAYLOAD SPONSOR PRIOR TO EACH LAUNCH. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
54. DETAIL OF GENERAL ELECTRIC AIRBORNE BEACON EQUIPMENT TEST SET ...
54. DETAIL OF GENERAL ELECTRIC AIRBORNE BEACON EQUIPMENT TEST SET (LEFT) AND ASSOCIATED GOULD BRUSH CHART RECORDERS (RIGHT). ELAPSED TIME COUNTER SITS ATOP AIRBORNE BEACON EQUIPMENT TEST SET. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
34. VIEW OF THREE MONITORS LOCATED IMMEDIATELY WEST OF THOSE ...
34. VIEW OF THREE MONITORS LOCATED IMMEDIATELY WEST OF THOSE IN PHOTO A-33. TELEPHONE BELOW THE CENTER MONITOR IS LABLED 'ACCIDENT REPORTING EMERGENCY NOTIFICATION SYSTEM ONLY.' - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durlak, E.R.
1986-05-01
This report presents a summary of the results of site-evaluation inspection conducted at Navy, Army, and Air Force base. The solar systems evaluated included space heating, space cooling, and domestic hot water system. The systems range in size from small two-collector systems to large arrays installed on barracks, mess halls, office buildings, etc. These operational results are presented so that future designs will benefit from the lesson learned in this study.
United States Counterinsurgency Doctrine and Implementation in Iraq
2004-06-18
combat force until the host nation can stabilize the situation and that, The primary role for US military forces in combat operations is to support...they are to the insurgent as the water is to a fish . Not only does water sustain the life of the fish , it also drowns the enemy. Discipline in the...the populous by building trust and then sharing ideology. Because this process can take time, he makes the point in his Primer on Guerrilla War that
Telepresence for touch and proprioception in teleoperator systems
NASA Technical Reports Server (NTRS)
Hagner, David G.; Webster, John G.
1988-01-01
The control and operation of mechanical manipulators by a human and the use of sensory tactile and force feedback is reviewed. The terms telepresence, teleproprioception, and teletouch are defined and relevant technologies that have or could have been applied to teleoperation are discussed. An ideal method of tactile sensory feedback for teleoperators that is based upon reproduction of the object's contour is discussed, and its practicality considered. Previously developed components that could be used to build a system incorporating sensory tactile and force feedback are presented.
2001-08-01
Benefit the Direct and Indirect Methods 16 Figure Figure 1: Military Exchanges’ Food Sales for Fiscal Year 1999 6 Abbreviations AAFES Army and Air Force...military installation. As the franchisee , the exchange service builds and operates the restaurants and directly employs and trains the personnel. In...they do not routinely develop a business case analysis, which would include weighing financial benefits with other factors, when determining which
20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC3W CONTROL ...
20. VIEW OF CONSOLE IN NORTHWEST CORNER OF SLC-3W CONTROL ROOM. PANELS FROM LEFT TO RIGHT: OPERATIONS AND CHECKOUT (LABELED POWER CONTROL AND MONITOR PANEL); RANGE SAFETY (LABELED DESTRUCT SYSTEM CONTROL AND MONITOR PANEL); BATTERY CLOCK PANELS. PEDAL FOR FOOT CONTROL OF COMMUNICATIONS HEADSET AND HEADSET IN FOREGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
2. GENERAL VIEW OF SLC3 AIR FORCE BUILDING (BLDG. 761) ...
2. GENERAL VIEW OF SLC-3 AIR FORCE BUILDING (BLDG. 761) FROM THE NORTHWEST - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
1. GENERAL VIEW OF SLC3 AIR FORCE BUILDING (BLDG. 761) ...
1. GENERAL VIEW OF SLC-3 AIR FORCE BUILDING (BLDG. 761) FROM THE SOUTHWEST - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Pedestrians’ behavior in emergency evacuation: Modeling and simulation
NASA Astrophysics Data System (ADS)
Wang, Lei; Zheng, Jie-Hui; Zhang, Xiao-Shuang; Zhang, Jian-Lin; Wang, Qiu-Zhen; Zhang, Qian
2016-11-01
The social force model has been widely used to simulate pedestrian evacuation by analyzing attractive, repulsive, driving, and fluctuating forces among pedestrians. Many researchers have improved its limitations in simulating behaviors of large-scale population. This study modifies the well-accepted social force model by considering the impacts of interaction among companions and further develops a comprehensive model by combining that with a multi-exit utility function. Then numerical simulations of evacuations based on the comprehensive model are implemented in the waiting hall of the Wulin Square Subway Station in Hangzhou, China. The results provide safety thresholds of pedestrian density and panic levels in different operation situations. In spite of the operation situation and the panic level, a larger friend-group size results in lower evacuation efficiency. Our study makes important contributions to building a comprehensive multi-exit social force model and to applying it to actual scenarios, which produces data to facilitate decision making in contingency plans and emergency treatment. Project supported by the National Natural Science Foundation of China (Grant No. 71471163).
Photographic copy of construction drawing, dated October 19, 1962, Department ...
Photographic copy of construction drawing, dated October 19, 1962, Department of the Air Force Air Defense Command Installations, in possession of Selfridge Base Museum, Mt. Clemens, Michigan. ALTER POL OPERATIONS, SHEET 1 OF 2, SLF 140-070 - Selfridge Field, Building No. 1445, Sugarbush Road north of Bunker Road, Mount Clemens, Macomb County, MI
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN ...
14. DETAIL OF EAST END OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING BLANK PANEL AND COMPLEX SAFETY OFFICER PANEL. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC3W ...
13. DETAIL OF CENTER OF CENTRAL CONTROL CONSOLE IN SLC-3W CONTROL ROOM SHOWING USAF LAUNCH CONTROLLER AND ASSISTANT USAF LAUNCH CONTROLLER PANELS. CONSOLES AND CHAIRS NEAR NORTH WALL IN BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
51. VIEW OF LORAL ADS 100A COMPUTERS LOCATED CENTRALLY ON ...
51. VIEW OF LORAL ADS 100A COMPUTERS LOCATED CENTRALLY ON NORTH WALL OF TELEMETRY ROOM (ROOM 106). SLC-3W CONTROL ROOM IS VISIBLE IN BACKGROUND THROUGH WINDOW IN NORTH WALL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
The AAF in the Invasion of Southern France
1992-01-01
action. (e) To transport and drop airborne troops engaged in the operation. (f) To cooperate with the Maquis by air action and air supply. In addition MAAF...operations in aid of the Partisans. PLANNING As far back as i April 1943 the eyes of the Allied forces in the Mediterranean were focusing on a possible landing...elimination of bush and dry vegetation fire hazards; and erection of airfield buildings. Signals The problems faced by the Signals Planning Staff at
Utility of de-escalatory confidence-building measures
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nation, J.
1989-06-01
This paper evaluates the utility of specific confidence-building de-escalatory measures and pays special attention to the evaluation of measures which place restrictions on or establish procedures for strategic forces. Some measures appear more promising than others. Potentially useful confidence-building measures largely satisfy defined criteria and include the phased return of strategic nuclear forces to peacetime bases and operations, the termination of interference with communications and NTMs (National Technical Means) and the termination of civil defense preparations. Less-promising CBMs include the standing down of supplemental early warning systems, the establishment of SSBN keep-out zones, and decreases in bomber alert rates. Establishmentmore » of SSBN keep-out zones and reduction in bomber rates are difficult to verify, while the standing-down of early warning systems provides little benefit at potentially large costs. Particular confidence-building measures (CBMs) may be most useful in building superpower confidence at specific points in the crisis termination phase. For example, a decrease in strategic bomber alert rates may provide some decrease in perception of the likelihood of war, but its potential costs, particularly in increasing bomber vulnerability, may limit its utility and implementation to the final crisis stages when the risks of re-escalation and surprise attack are lower.« less
Balancing Science Objectives and Operational Constraints: A Mission Planner's Challenge
NASA Technical Reports Server (NTRS)
Weldy, Michelle
1996-01-01
The Air Force minute sensor technology integration (MSTI-3) satellite's primary mission is to characterize Earth's atmospheric background clutter. MSTI-3 will use three cameras for data collection, a mid-wave infrared imager, a short wave infrared imager, and a visible imaging spectrometer. Mission science objectives call for the collection of over 2 million images within the one year mission life. In addition, operational constraints limit camera usage to four operations of twenty minutes per day, with no more than 10,000 data and calibrating images collected per day. To balance the operational constraints and science objectives, the mission planning team has designed a planning process to e event schedules and sensor operation timelines. Each set of constraints, including spacecraft performance capabilities, the camera filters, the geographical regions, and the spacecraft-Sun-Earth geometries of interest, and remote tracking station deconflictions has been accounted for in this methodology. To aid in this process, the mission planning team is building a series of tools from commercial off-the-shelf software. These include the mission manifest which builds a daily schedule of events, and the MSTI Scene Simulator which helps build geometrically correct scans. These tools provide an efficient, responsive, and highly flexible architecture that maximizes data collection while minimizing mission planning time.
2009-01-12
VANDENBERG AIR FORCE BASE, Calif. – In Building 1610 at Vandenberg Air Force Base in California, the United Launch Alliance direct mate adapter, or DMA, is installed on the NOAA-N Prime's payload attach fitting underneath the spacecraft. The DMA is needed to install the payload canister around the spacecraft for the journey to the launch pad. NOAA-N Prime is the latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration. Launch of NOAA-N Prime is scheduled for Feb. 4. Photo credit: NASA/Doug Kolkow, VAFB
2009-01-12
VANDENBERG AIR FORCE BASE, Calif. – In Building 1610 at Vandenberg Air Force Base in California, the United Launch Alliance direct mate adapter, or DMA, is installed on the NOAA-N Prime's payload attach fitting underneath the spacecraft. The DMA is needed to install the payload canister around the spacecraft for the journey to the launch pad. NOAA-N Prime is the latest polar-orbiting operational environmental weather satellite developed by NASA for the National Oceanic and Atmospheric Administration. Launch of NOAA-N Prime is scheduled for Feb. 4. Photo credit: NASA/Doug Kolkow, VAFB
2011-05-04
According to U.S. COIN doctrine, a critical requirement for operational success is the safeguarding of the civilian population . 30 USNORTHCOM...fighter squadron known as the Aztec Eagles. 41 The squadron actually deployed overseas during the war as the 201 st Mexican Expeditionary Air Force
2016-04-04
structure. Weather Reconnaissance capability would aid the Guard in gathering meteorological intelligence in preparation for hurricane or tornado domestic...Reserve units by relating it to an emergency response in Missouri. On May 22, 2011, a tornado struck Joplin, killing 158 people and injuring 1,000
95. VIEW OF LANDLINE INSTRUMENTATION ROOM FROM NORTHEAST CORNER SHOWING ...
95. VIEW OF LANDLINE INSTRUMENTATION ROOM FROM NORTHEAST CORNER SHOWING PART OF EACH OF TWO ROWS OF CABINETS CONTAINING ESTERLINE ANGUS CHART RECORDERS. West end of back row of cabinets, containing power distribution units, not accessible for photography. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Search and Determine Integrated Environment (SADIE)
NASA Astrophysics Data System (ADS)
Sabol, C.; Schumacher, P.; Segerman, A.; Coffey, S.; Hoskins, A.
2012-09-01
A new and integrated high performance computing software applications package called the Search and Determine Integrated Environment (SADIE) is being jointly developed and refined by the Air Force and Naval Research Laboratories (AFRL and NRL) to automatically resolve uncorrelated tracks (UCTs) and build a more complete space object catalog for improved Space Situational Awareness (SSA). The motivation for SADIE is to respond to very challenging needs identified and guidance received from Air Force Space Command (AFSPC) and other senior leaders to develop this technology to support the evolving Joint Space Operations Center (JSpOC) and Alternate Space Control Center (ASC2)-Dahlgren. The JSpOC and JMS SSA mission requirements and threads flow down from the United States Strategic Command (USSTRATCOM). The SADIE suite includes modification and integration of legacy applications and software components that include Search And Determine (SAD), Satellite Identification (SID), and Parallel Catalog (Parcat), as well as other utilities and scripts to enable end-to-end catalog building and maintenance in a parallel processing environment. SADIE is being developed to handle large catalog building challenges in all orbit regimes and includes the automatic processing of radar, fence, and optical data. Real data results are provided for the processing of Air Force Space Surveillance System fence observations and for the processing of Space Surveillance Telescope optical data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meanor, T.
1999-07-01
The Environmental Management directorate of ASC (ASC/EM) has the responsibility of providing government oversight for the Government Owned Contractor Operated Aircraft and Missile plants (GOCOs). This oversight is manifested as a landlord role where Air Force provides the funding required to maintain the plant facilities including buildings and utilities as well as environmental systems. By agreement the companies operating the plants are required to operate them in accordance with environmental law. Presently the GOCOs include Air Force Plant (AFP) 6 in Marietta Ga., AFP 4 in Fort Worth, Tx., AFP 44 in Tucson, Az., AFP 42 in Palmdale, Ca., andmore » AFP PJKS in Denver, Co. Lockheed Martin corporation operates AFPs 4,6, PJKS and a portion of AFP 42 while AFP 44 is operated by Raytheon Missile Systems Company. Other GOCOs at AFP 42 are Northrup-Grumman, Boeing, and Cabaco, the facilities engineer. Since 1992 the Environmental Management division has conducted its Environmental Compliance Assessment and Management Program assessments (ECAMP) annually at each of the plants. Using DOD's ECAMP Team Guide and teams comprised of both Air Force and consultant engineering personnel, each plant is assessed for its environmental compliance well being. In the face of rising operational costs and diminishing budgets ASC/EM performed a comprehensive review of its ECAMP. As a result, the basic ECAMP program was improved to reduce costs without compromising on quality of the effort. The program retained its emphasis in providing a snap-shot evaluation of each Air Force plant's environmental compliance health supported by complete but tailored protocol assessments.« less
Dynamics of ultrasonic additive manufacturing.
Hehr, Adam; Dapino, Marcelo J
2017-01-01
Ultrasonic additive manufacturing (UAM) is a solid-state technology for joining similar and dissimilar metal foils near room temperature by scrubbing them together with ultrasonic vibrations under pressure. Structural dynamics of the welding assembly and work piece influence how energy is transferred during the process and ultimately, part quality. To understand the effect of structural dynamics during UAM, a linear time-invariant model is proposed to relate the inputs of shear force and electric current to resultant welder velocity and voltage. Measured frequency response and operating performance of the welder under no load is used to identify model parameters. Using this model and in-situ measurements, shear force and welder efficiency are estimated to be near 2000N and 80% when welding Al 6061-H18 weld foil, respectively. Shear force and welder efficiency have never been estimated before in UAM. The influence of processing conditions, i.e., welder amplitude, normal force, and weld speed, on shear force and welder efficiency are investigated. Welder velocity was found to strongly influence the shear force magnitude and efficiency while normal force and weld speed showed little to no influence. The proposed model is used to describe high frequency harmonic content in the velocity response of the welder during welding operations and coupling of the UAM build with the welder. Copyright © 2016 Elsevier B.V. All rights reserved.
Building 909, oblique view to southeast, 135 mm lens. Building ...
Building 909, oblique view to southeast, 135 mm lens. Building 908 at extreme right for context. - Travis Air Force Base, Handling Crew Building, North of W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Coordinating with Humans by Adjustable-Autonomy for Multirobot Pursuit (CHAMP)
NASA Astrophysics Data System (ADS)
Dumond, Danielle; Ayers, Jeanine; Schurr, Nathan; Carlin, Alan; Burke, Dustin; Rousseau, Jeffrey
2012-06-01
One of the primary challenges facing the modern small-unit tactical team is the ability of the unit to safely and effectively search, explore, clear and hold urbanized terrain that includes buildings, streets, and subterranean dwellings. Buildings provide cover and concealment to an enemy and restrict the movement of forces while diminishing their ability to engage the adversary. The use of robots has significant potential to reduce the risk to tactical teams and dramatically force multiply the small unit's footprint. Despite advances in robotic mobility, sensing capabilities, and human-robot interaction, the use of robots in room clearing operations remains nascent. CHAMP is a software system in development that integrates with a team of robotic platforms to enable them to coordinate with a human operator performing a search and pursuit task. In this way, the human operator can either give control to the robots to search autonomously, or can retain control and direct the robots where needed. CHAMP's autonomy is built upon a combination of adversarial pursuit algorithms and dynamic function allocation strategies that maximize the team's resources. Multi-modal interaction with CHAMP is achieved using novel gesture-recognition based capabilities to reduce the need for heads-down tele-operation. The Champ Coordination Algorithm addresses dynamic and limited team sizes, generates a novel map of the area, and takes into account mission goals, user preferences and team roles. In this paper we show results from preliminary simulated experiments and find that the CHAMP system performs faster than traditional search and pursuit algorithms.
2001-01-01
of them. The dormitory I went through is not fit to live in. Do some- thing.� So, we asked him, �Boss, are you going to make us � lipstick the pig...Guard to use Governor�s Island. They were hesitant at first because the buildings on the base had been shut down for the last few years � it�s basically...together the resources of the base to serve as the backbone of emergency incidents. (Photo by Scott H. Spitzer) apartment building and were using about 75
Identifying and Modeling Dynamic Preference Evolution in Multipurpose Water Resources Systems
NASA Astrophysics Data System (ADS)
Mason, E.; Giuliani, M.; Castelletti, A.; Amigoni, F.
2018-04-01
Multipurpose water systems are usually operated on a tradeoff of conflicting operating objectives. Under steady state climatic and socioeconomic conditions, such tradeoff is supposed to represent a fair and/or efficient preference. Extreme variability in external forcing might affect water operators' risk aversion and force a change in her/his preference. Properly accounting for these shifts is key to any rigorous retrospective assessment of the operator's behaviors, and to build descriptive models for projecting the future system evolution. In this study, we explore how the selection of different preferences is linked to variations in the external forcing. We argue that preference selection evolves according to recent, extreme variations in system performance: underperforming in one of the objectives pushes the preference toward the harmed objective. To test this assumption, we developed a rational procedure to simulate the operator's preference selection. We map this selection onto a multilateral negotiation, where multiple virtual agents independently optimize different objectives. The agents periodically negotiate a compromise policy for the operation of the system. Agents' attitudes in each negotiation step are determined by the recent system performance measured by the specific objective they maximize. We then propose a numerical model of preference dynamics that implements a concept from cognitive psychology, the availability bias. We test our modeling framework on a synthetic lake operated for flood control and water supply. Results show that our model successfully captures the operator's preference selection and dynamic evolution driven by extreme wet and dry situations.
28. View of data test area for DR data take ...
28. View of data test area for DR data take off set operators panel and cabinet at second floor of transmitter building no. 102 in MIP area. - Clear Air Force Station, Ballistic Missile Early Warning System Site II, One mile west of mile marker 293.5 on Parks Highway, 5 miles southwest of Anderson, Anderson, Denali Borough, AK
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-08
Under Secretary of the Air Force Dr. Ronald Sega, testifies before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-07
Under Secretary of the Air Force Dr. Ronald Sega, testifies before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
ERIC Educational Resources Information Center
Blaauw-Hara, Mark
2017-01-01
In this article, I provide an overview of student veterans' experiences learning in the military, from the ways the armed forces operate as a community of practice to how they build the competence of their service-members through application of andragogical principles. I then contrast the learning environment of the military to that of college,…
80. FOUR VIDEO MONITORS LOCATED ALONG THE SOUTH WALL OF ...
80. FOUR VIDEO MONITORS LOCATED ALONG THE SOUTH WALL OF SLC-3E CONTROL ROOM. (TWO VIDEOTEK MONITORS ON LEFT (EAST) ARE COLOR; OTHERS ARE BLACK AND WHITE.) DIGITAL COUNTDOWN, HOLD, AND GREENWHICH MEAN TIME CLOCKS LOCATED ABOVE MONITORS 4 AND 5. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Building 932, oblique view to northwest, 90 mm lens. Building ...
Building 932, oblique view to northwest, 90 mm lens. Building 933-935 at extreme left. - Travis Air Force Base, Nuclear Weapons Assembly Plant 5, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
10. Credit USAF, 1945. Original housed in the Muroc Flight ...
10. Credit USAF, 1945. Original housed in the Muroc Flight Test Base, Unit History, 1 September 1942 30 June 1945. Alfred F. Simpson Historical Research Agency. United States Air Force. Maxwell AFB, Alabama. View of jet engine rotor balancing machine with engine rotor in place for balancing operations. Original caption reads "Balancing bucket wheel of jet engine, Muroc Flight Test Base, Oct. 1945"; personnel not identified. Location where photograph was taken not determined, but presumed to be in shops of Building 4505. - Edwards Air Force Base, North Base, Hangar, End of North Base Road, Boron, Kern County, CA
Global Monitoring of the CTBT: Progress, Capabilities and Plans (Invited)
NASA Astrophysics Data System (ADS)
Zerbo, L.
2013-12-01
The Preparatory Commission for the Comprehensive Nuclear-Test-Ban Treaty Organization (CTBTO), established in 1996, is tasked with building up the verification regime of the CTBT. The regime includes a global system for monitoring the earth, the oceans and the atmosphere for nuclear tests, and an on-site inspection (OSI) capability. More than 80% of the 337 facilities of the International Monitoring System (IMS) have been installed and are sending data to the International Data Centre (IDC) in Vienna, Austria for processing. These IMS data along with IDC processed and reviewed products are available to all States that have signed the Treaty. Concurrent with the build-up of the global monitoring networks, near-field geophysical methods are being developed and tested for OSIs. The monitoring system is currently operating in a provisional mode, as the Treaty has not yet entered into force. Progress in installing and operating the IMS and the IDC and in building up an OSI capability will be described. The capabilities of the monitoring networks have progressively improved as stations are added to the IMS and IDC processing techniques refined. Detection thresholds for seismic, hydroacoustic, infrasound and radionuclide events have been measured and in general are equal to or lower than the predictions used during the Treaty negotiations. The measurements have led to improved models and tools that allow more accurate predictions of future capabilities and network performance under any configuration. Unplanned tests of the monitoring network occurred when the DPRK announced nuclear tests in 2006, 2009, and 2013. All three tests were well above the detection threshold and easily detected and located by the seismic monitoring network. In addition, noble gas consistent with the nuclear tests in 2006 and 2013 (according to atmospheric transport models) was detected by stations in the network. On-site inspections of these tests were not conducted as the Treaty has not entered into force. In order to achieve a credible and trustworthy Verification System, increased focus is being put on the development of OSI operational capabilities while operating and sustaining the existing monitoring system, increasing the data availability and quality, and completing the remaining facilities of the IMS. Furthermore, as mandated by the Treaty, the CTBTO also seeks to continuously improve its technologies and methods through interaction with the scientific community. Workshops and scientific conferences such as the CTBT Science and Technology Conference series provide venues for exchanging ideas, and mechanisms have been developed for sharing IMS data with researchers who are developing and testing new and innovative methods pertinent to the verification regime. While progress is steady on building up the verification regime, there is also progress in gaining entry into force of the Treaty, which requires the signatures and ratifications of the DPRK, India and Pakistan; it also requires the ratifications of China, Egypt, Iran, Israel and the United States. Thirty-six other States, whose signatures and ratifications are needed for entry into force have already done so.
Liu, Yuangang; Guo, Qingsheng; Sun, Yageng; Ma, Xiaoya
2014-01-01
Scale reduction from source to target maps inevitably leads to conflicts of map symbols in cartography and geographic information systems (GIS). Displacement is one of the most important map generalization operators and it can be used to resolve the problems that arise from conflict among two or more map objects. In this paper, we propose a combined approach based on constraint Delaunay triangulation (CDT) skeleton and improved elastic beam algorithm for automated building displacement. In this approach, map data sets are first partitioned. Then the displacement operation is conducted in each partition as a cyclic and iterative process of conflict detection and resolution. In the iteration, the skeleton of the gap spaces is extracted using CDT. It then serves as an enhanced data model to detect conflicts and construct the proximity graph. Then, the proximity graph is adjusted using local grouping information. Under the action of forces derived from the detected conflicts, the proximity graph is deformed using the improved elastic beam algorithm. In this way, buildings are displaced to find an optimal compromise between related cartographic constraints. To validate this approach, two topographic map data sets (i.e., urban and suburban areas) were tested. The results were reasonable with respect to each constraint when the density of the map was not extremely high. In summary, the improvements include (1) an automated parameter-setting method for elastic beams, (2) explicit enforcement regarding the positional accuracy constraint, added by introducing drag forces, (3) preservation of local building groups through displacement over an adjusted proximity graph, and (4) an iterative strategy that is more likely to resolve the proximity conflicts than the one used in the existing elastic beam algorithm. PMID:25470727
NASA Technical Reports Server (NTRS)
Dinh, Khanh
1994-01-01
Air-conditioner provides ventilation designed to be used alone or incorporated into cooling or heating system operates efficiently only by recirculating stale air within building. Energy needed to operate overall ventilating cooling or heating system slightly greater than operating nonventilating cooling or heating system. Helps to preserve energy efficiency while satisfying need for increased forced ventilation to prevent accumulation of undesired gases like radon and formaldehyde. Provides fresh treated air to variety of confined spaces: hospital surgeries, laboratories, clean rooms, and printing shops and other places where solvents used. In mobile homes and portable classrooms, eliminates irritant chemicals exuded by carpets, panels, and other materials, ensuring healthy indoor environment for occupants.
4. Credit JPL. Original 4" x 5" black and white ...
4. Credit JPL. Original 4" x 5" black and white negative housed in the JPL Archives, Pasadena, California. This interior view displays the machine shop in the Administration/Shops Building (the compass angle of the view is undetermined). Looking clockwise from the lower left, the machine tools in view are a power hacksaw, a heat-treatment oven (with white gloves on top), a large hydraulic press with a tool grinder at its immediate right; along the wall in the back of the view are various unidentified machine tool attachments and a vertical milling machine. In the background, a machinist is operating a radial drilling machine, to the right of which is a small drill press. To the lower right, another machinist is operating a Pratt & Whitney engine lathe; behind the operator stand a workbench and vertical bandsaw (JPL negative no. 384-10939, 29 July 1975). - Jet Propulsion Laboratory Edwards Facility, Administration & Shops Building, Edwards Air Force Base, Boron, Kern County, CA
105. VIEW NORTH FROM SLC3W CABLE TUNNEL INTO CABLE VAULT ...
105. VIEW NORTH FROM SLC-3W CABLE TUNNEL INTO CABLE VAULT AND SLC-3E CABLE TUNNEL. NOTE WOODEN PLANKING ON FLOOR OF TUNNEL AND CABLE TRAYS LINING TUNNEL WALLS. STAIRS ON EAST WALL OF CABLE VAULT LEAD INTO LANDLINE INSTRUMENTATION ROOM. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
25. VIEW OF ATLAS CONTROL CONSOLE NEAR NORTHEAST CORNER OF ...
25. VIEW OF ATLAS CONTROL CONSOLE NEAR NORTHEAST CORNER OF SLC-3W CONTROL ROOM. CONSOLE INCLUDES TELEVISION CONTROL, FACILITIES, AND VEHICLE (MISSILE) POWER PANELS. FROM LEFT TO RIGHT IN BACKGROUND: MILITARY-TIME CLOCK, BASE OF BUNKER PERISCOPE, AND STAIRS TO ESCAPE TUNNEL. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
The Czech Provincial Reconstruction Team: Civil-Military Teaming in Logar Province
2013-03-01
which authorized ISAF forces to assist Afghan authorities in providing security through ISAF operations across Afghanistan. Alexandr Vondra, the...Ministry of Defense Alexandr Vondra, web site Provincional Reconstruction Team Logar news, the Czech Republic, http://www.mzv.cz/prtlogar/cz...Meade Avenue, Building 50 Fort Leavenworth, 1-3. 4 Handbook Afghanistan Provincial Reconstruction Team No.11-16, Feb.11 published by Center for
2016-06-01
bolstering fragile states and preventing violence from erupting: “we will focus on building the capacity of others to prevent the causes and consequences of...assisting fragile states as well, emphasizing violence prevention in its 2013 adopted policy on stabilization efforts in conflict-affected...practices for violence prevention and countermeasures. Second, this research considers DANSOF capabilities and recent DANSOF involvement in
3. PHOTOCOPY OF DRAWING (1960 ARCHITECTURAL DRAWING BY THE RALPH ...
3. PHOTOCOPY OF DRAWING (1960 ARCHITECTURAL DRAWING BY THE RALPH M. PARSONS COMPANY) FLOOR PLAN, ELEVATIONS, AND SECTION FOR THE SAMOS TECHNICAL SUPPORT BUILDING (BLDG. 761; NOW CALLED SLC-3 AIR FORCE BUILDING), SHEET A14 - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
4. PHOTOCOPY OF DRAWING (1960 CIVIL ENGINEERING DRAWING THE THE ...
4. PHOTOCOPY OF DRAWING (1960 CIVIL ENGINEERING DRAWING THE THE RALPH M. PARSONS COMPANY) PLOT AND UTILITY PLAN FOR THE SAMOS TECHNICAL SUPPORT BUILDING (BLDG. 761; NOW CALLED SLC-3 AIR FORCE BUILDING), SHEET C47 - Vandenberg Air Force Base, Space Launch Complex 3, SLC-3 Air Force Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Building 931, oblique view to northwest, 210 mm lens. ...
Building 931, oblique view to northwest, 210 mm lens. - Travis Air Force Base, Central Battery Charging Building, North of W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Building 931, oblique view to southeast, 135 mm lens. ...
Building 931, oblique view to southeast, 135 mm lens. - Travis Air Force Base, Central Battery Charging Building, North of W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
2018-05-02
The 2017 class of astronaut candidates are at United Launch Alliance's Space Launch Complex 41 at Cape Canaveral Air Force Station (CCAFS) in Florida for a familiarization tour. They also toured facilities at Kennedy Space Center, including the Neil Armstrong Operations and Checkout Building high bay; the Launch Control Center, Launch Complex 39B, the Vehicle Assembly Building, Boeing's Commercial Crew and Cargo Facility, and SpaceX's Launch Complex 39A. The candidates will spend about two years getting to know the space station systems and learning how to spacewalk, speak Russian, control the International Space Station's robotic arm and fly T-38s, before they're eligible to be assigned to a mission.
CONTROL BUILDING, WEST FRONT SHOWING ENTRANCE Edwards Air Force ...
CONTROL BUILDING, WEST FRONT SHOWING ENTRANCE - Edwards Air Force Base, X-15 Engine Test Complex, Firing Control Building, Rogers Dry Lake, east of runway between North Base & South Base, Boron, Kern County, CA
1. BUILDING 8814, NORTH FRONT AND WEST SIDE. BUILDING 8832, ...
1. BUILDING 8814, NORTH FRONT AND WEST SIDE. BUILDING 8832, TEST STAND 1-E, IN LEFT DISTANCE. Looking southeast. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunker 1-D-3, Test Area 1-125, northwest end of Altair Boulevard, Boron, Kern County, CA
Building 933935, oblique view to southeast showing, left to right, ...
Building 933-935, oblique view to southeast showing, left to right, rear doors to building 933, 934, 935, 90 mm lens. Building 933 is in foreground. - Travis Air Force Base, Nuclear Weapons Assembly Plant 4, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Detail, rear door types, building 242, oblique view to southwest, ...
Detail, rear door types, building 242, oblique view to southwest, 90 mm lens. - Travis Air Force Base, Nuclear Weapons Assembly Building, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
4. BUILDING 8767, INTERIOR. Looking west. Edwards Air Force ...
4. BUILDING 8767, INTERIOR. Looking west. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
3. Credit BG. The interior of the control room appears ...
3. Credit BG. The interior of the control room appears in this view, looking north (0°). The control console in the room center permitted remote control of various propellant grinders and mixers in surrounding buildings. Television monitors (absent from their mounts in this view) permitted direct viewing of operating machinery. From foreground to background: Panel (1) contains OGAR warning light switches for Curing Buildings E-39, E-40, E-41 and E-86; (O=off, G=green safe, A=amber caution, R=red danger) Panel (2) E-85 Oxidizer Dryer Building console: OGAR switch Panel (3) E-84 Oxidizer Grinder Building console: controls for vibrator, feed, and hammer; Panel (4) E-36 Oxidizer Grinder Building console: controls for vibrator, feed, hammer, attritor, and SWECO ("SWECO" undefined) Panels (5) & (6) blank Panel (7) E-38 Mixer & Casting Building console: vacuum pump, blender, heating and cooling controls Panel (8) E-37 Mixer & Casting Building console: motor controls for 1 pint, 1 gallon, 5 gallon and 30 gallon mixers; vacuum pump, deluge (fire suppression), pot up/down, vibrator, feed, and SWECO. - Jet Propulsion Laboratory Edwards Facility, Weigh & Control Building, Edwards Air Force Base, Boron, Kern County, CA
Building a Constituency for Children.
ERIC Educational Resources Information Center
Hale, Margie
One of the goals of the West Virginia Task Force on Children, Youth and Families is to build a constituency for children. Two critical factors in building a constituency for children are a shared vision and influential leaders. The four principles used by the Task Force for building a constituency are: (1) defining a regional target for organizing…
Building 933935, oblique view to southwest showing, left to right, ...
Building 933-935, oblique view to southwest showing, left to right, rear doors to building 933, 934, 935, 90 mm lens. Building 934 in the center of complex. - Travis Air Force Base, Nuclear Weapons Assembly Plant 3, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Building 930, oblique view to southeast from fill slope covering ...
Building 930, oblique view to southeast from fill slope covering building 932, 135 mm lens. - Travis Air Force Base, Snack Bar, North of W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Epitaxial growth of pentacene on alkali halide surfaces studied by Kelvin probe force microscopy.
Neff, Julia L; Milde, Peter; León, Carmen Pérez; Kundrat, Matthew D; Eng, Lukas M; Jacob, Christoph R; Hoffmann-Vogel, Regina
2014-04-22
In the field of molecular electronics, thin films of molecules adsorbed on insulating surfaces are used as the functional building blocks of electronic devices. Control of the structural and electronic properties of the thin films is required for reliably operating devices. Here, noncontact atomic force and Kelvin probe force microscopies have been used to investigate the growth and electrostatic landscape of pentacene on KBr(001) and KCl(001) surfaces. We have found that, together with molecular islands of upright standing pentacene, a new phase of tilted molecules appears near step edges on KBr. Local contact potential differences (LCPD) have been studied with both Kelvin experiments and density functional theory calculations. Our images reveal that differently oriented molecules display different LCPD and that their value is independent of the number of molecular layers. These results point to the formation of an interface dipole, which may be explained by a partial charge transfer from the pentacene to the surface. Moreover, the monitoring of the evolution of the pentacene islands shows that they are strongly affected by dewetting: Multilayers build up at the expense of monolayers, and in the Kelvin images, previously unknown line defects appear, which reveal the epitaxial growth of pentacene crystals.
Special Operations Forces Interagency Counterterrorism Reference Manual, Second Edition
2011-04-01
identify, interdict, and defeat terrorists. The Antiterrorism Assistance Program ( ATA ), implemented by the DS and discussed later (page 1-12), is...the Federal Bureau of Investigation. Antiterrorism Assistance Program ( ATA ) www.state.gov/m/ds/terrorism/c8583.htm The ATA is managed by the Office...scene investigation, airport and building secu- rity, maritime protection measures, and VIP protec- tion. More broadly, ATA seek to increase capacity to
Information Operations, an Evolutionary Step for the Mexican Armed Forces
2007-12-01
Marcela Sanchez. “Building On Plan Colombia,” Washington Post , 4 November 2006, Final Edition, A23. 72 Counterinsurgency. It is important to...Revolucionario (EPR), Ejército Revolucionario del Pueblo Independiente (ERPI), Comando Jaramillista Morelense of 23 May (CJM-23), Ejército Villista...the insurgency was influenced by Mexico’s transition from modernity to post modernity -- specifically its membership in NAFTA. If the country had
2015-05-21
lie outside their span of control. This monograph therefore assumes no significant changes to whole-of- government collaboration, legislated ...with several other military and whole-of-government BPC efforts. Security cooperation and security assistance (SA) are legislated portfolios of...Plan Colombia, the campaign proposed in 1999 by the Colombian President to reduce internal conflict, led to increased US confidence and support for
2009-03-01
AOR – Area of Responsibility CENTCOM – United States Central Command CMF – Combined Maritime Force COCOM – Combatant Commander...unhelpful to embrace absolute dichotomies – such as purely private versus public goods – which fail to distinguish intermediate possibilities of...external conflict. 16 B. COUNTRIES In order to ensure wide inclusion of extremely varied countries, 84 countries from the areas of
Maritime Action Groups: The Expeditionary Building Block of the Future
1993-03-10
attack submarine, and an alert P-3 aircraft. Captain Robert Crawshaw , USN, Commodore of the initial Sixth Fleet Maritime Action Group emphasizes that...services and our coalition partners. Captain Crawshaw stated that: -the MAG operates as a single force exercising with allied navies throughout the...Less intimidating than a carrier battle group, the MAG has been received eagerly by allied navies throughout the Mediterranean.’ Captain Crawshaw and
Recent Military Operations on Urban Terrain
1982-07-01
T) R. D. McLaurin Lewis W. Snider DAAK11-80-C-0065 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM EL.EMENT. PROJECT, TASK Abbott Associates...before the October War. Buildings had been demolished; kill zones demarcated; streets blocked; the populace armed, organized , and trained; and a realis...handicaps caused by poor tactical organization and the resulting cutting off of three elements of the attacking force. Although radio communications from
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-07
NASA Administrator Michael Griffin, left, testifies before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program, as Under Secretary of the Air Force Dr. Ronald Sega looks on, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
It’s Not New: Historical U.S. Army Security Forces Assistance Efforts
2012-12-06
obligation.30 In a recent article published by Small Wars Journal, Kip Whittington , a research associate at the National Defense University...operations in Afghanistan, Whittington believes that building capable indigenous national security institutions meets U.S. and international security...29Ibid., 11. 30Ibid. 31Kip Whittington , “An Afghanistan Without Institutions: A World Without Rest,” Small Wars Journal 8, no. 2 (February 2012
Update of KSC activities for the space transportation system
NASA Technical Reports Server (NTRS)
Gray, R. H.
1979-01-01
The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.
Forcing Interoperability: An Intentionally Fractured Approach
NASA Astrophysics Data System (ADS)
Gallaher, D. W.; Brodzik, M.; Scambos, T.; Stroeve, J.
2008-12-01
The NSIDC is attempting to rebuild a significant portion of its public-facing cyberinfrastructure to better meet the needs expressed by the cryospheric community. The project initially addresses a specific science need - understanding Greenland's contribution to global sea level rise through comparison and analysis of variables such as temperature, albedo, melt, ice velocity and surface elevation. This project will ultimately be expanded to cover most of NSIDC's cryospheric data. Like many organizations, we need to provide users with data discovery interfaces, collaboration tools and mapping services. Complicating this effort is the need to reduce the volume of raw data delivered to the user. Data growth, especially with time-series data, will overwhelm our software, processors and network like never before. We need to provide the users the ability to perform first level analysis directly on our site. In order to accomplish this, the users should be free to modify the behavior of these tools as well as incorporate their own tools and analysis to meet their needs. Rather than building one monolithic project to build this system, we have chosen to build three semi-independent systems. One team is building a data discovery and web based distribution system, the second is building an advanced analysis and workflow system and the third is building a customized web mapping service. These systems will use the same underlying data structures and services but will employ different technologies and teams to build their objectives, schedules and user interfaces. Obviously, we are adding complexity and risk to the overall project however this may be the best method to achieve interoperability because the development teams will be required to build off each others work. The teams will be forced to design with other users in mind as opposed to building interoperability as an afterthought, which a tendency in monolithic systems. All three teams will take advantage of preexisting software and standards whenever possible. We present this topic to stimulate discussion within the development, operational and research communities on how best to proceed.
3. BUILDING 8814, WEST SIDE AND SOUTH REAR, SHOWING BLAST ...
3. BUILDING 8814, WEST SIDE AND SOUTH REAR, SHOWING BLAST DOOR. BUILDING 8826 IS IN BACKGROUND. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunker 1-D-3, Test Area 1-125, northwest end of Altair Boulevard, Boron, Kern County, CA
Report of the HDA building Task Force.
Scheerer, Ernest W
2006-01-01
The Building Task Force, after researching the many options, recommended to the Board of Trustees that, at this time, it is in the best interest of the association and its members to keep the building. In addition to the reasons outlined in the preceding paragraphs, the conclusions drawn by the Task Force can be summarized as follows: 1) This is not the time to make a change as both land and construction costs are high; 2) There is little inventory at this time that would provide a significant improvement over the present building; 3) There is no urgent need to act now; and 4) Cost-effective changes can be made to make the building more valuable to the association.
Building Future Transatlantic Interoperability Around a Robust NATO Response Force
2012-10-01
than already traveled . However, this accrued wealth of interoperable capa- bility may be at its apogee, soon to decline as the result of two looming...and Bydgo- szcz, Poland, as well as major national training centers such as the bilateral U.S.- Romanian Joint Task Force– East at Kogalniceanu...operations. Increase U.S. and Allied Exchange Students at National and NATO military schools. Austerity measures may eventually affect the investment
Rapid Energy Modeling Workflow Demonstration
2013-10-31
one of the few deep-water ports on the West Coast. NBVC Port Hueneme is home to the Pacific Seabees, four Naval Mobile Construction Battalions...the base is to provide training, mobilization and deployment operations for Army, Navy, Air Force, and Marines. The base supports a population of... mobile was used on iPads in the field to create rough 3D building mass form models (Figure 6). This approach allowed teams to identify and model only
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-08
Under Secretary of the Air Force Dr. Ronald Sega, right, testifies before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program as NASA Administrator Michael Griffin, left, looks at a television monitor, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
Strategic Studies Quarterly. Volume 5, Number 2, Summer 2011
2011-01-01
Afghanistan. We also made progress in our support of operational planning by the combatant commanders and in building processes for them to issue...transformation of the department’s networks; • work with the combatant commands to synchronize processes and planning to deliver the joint effects...own actions and forces. Note that these and many other factors determining the process of deter- rence have as much to do with an opponent’s unique
Building the Army: A Strategic Review of a Complex Problem
2013-03-01
is more than a true chameleon that slightly adapts its characteristics to the given case.”2 One cannot predict the shifting colors/characteristics...Strategy (NMS) of the United States of America calling for a flexible, agile, and adaptive Joint Force capable of full spectrum operations that...or may not be remedied, one can safely certify TAA as a robust and proven process based solely on the adaptable and tailorable Army that exists
Aviation and Health: A Key Nexus for the US Air Force’s Regional Security-Building Efforts
2015-06-01
would advance through a network of air- strips near medical facilities including both simple dispensaries and hospitals to connect patients...preventive, community- based health care with a focus on public health research.18 AMREF continues to fly surgeons to rural hospitals where they not only...flyers support humanitarian assistance and domestic flying operations, including tourism , to bolster the economy via scheduled and chartered flights
From the Andes to the Hindu Kush: Columbian Airpower Lessons for Afghanistan
2010-05-20
includes both rotary and fixed wing assets to conduct a variety of air operations. The ANAAC build plan includes fifty-four Mi-17. Twenty of these are to...Win. Dulles: Potomac Books, Inc., 2007. Renner , Stephen L., Major. A Modest Proposal for Air Attack Combat Aviation Advisors. School of Advanced Air ...by Major William J Maher United States Air Force School of Advanced Military Studies United States Army Command and General
Air Force Operational Test and Evaluation Center, Volume 2, Number 2
1988-01-01
the special class of attributes arc recorded, cost or In place of the normalization ( I). we propose beliefit. the lollowins normalization NUMERICAL ...comprchcnsi\\c set of modular basic data flow to meet requirements at test tools ,. designed to provide flexible data reduction start, then building to...possible. a totlinaion ot the two position error measurement techniques arc used SLR is a methd of fitting a linear model o accumlulate a position error
Targeting: Social Network Analysis in Counter IED Operations
2011-06-01
members caused havoc amongst both French and Algerian citizens by placing bombs in public buildings, police stations, cafes, cinemas , and dance halls in...lifted the city’s curfew, schools were reopened and people were no longer afraid to fill shopping malls or go to the cinemas . The actions taken by...was able to carry out the 2009 JW Marriot and Ritz-Carlton hotel bombings in Jakarta before being killed by Malaysian forces in 2009
The Newest Air Force Core Function: Building Partnerships
2011-02-17
Arts in Military Operational Art and Science from Air University. 4 Chapter 1 Introduction Since the United States assumed the role of a...BP) with other friendly nations. Over the past ten years, the USAF role in BP expanded due to a major air advisory role in Iraq and Afghanistan as...well as other support activities around the world. Based on these expanding roles in the last decade, and the BP guidance contained in the
Detail, oblique view to northeast atop building 935 showing exposed ...
Detail, oblique view to northeast atop building 935 showing exposed roof sections of buildings 934 (center) and 933 (left), 90 mm lens. - Travis Air Force Base, Nuclear Weapons Assembly Plant 3, W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
28. Photocopy of engineering drawing, May, 1941 (original drawing located ...
28. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. AIR COOLED TEST STAND. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
2011-05-01
Solution for an Historic Building Renovation at the United States Air Force Academy • Abstract Number: 12623 Vandenberg Hall • Thin Film Solar Array • Direct...Phase 1 • Total installed production capacity: 212.320 KW DC • Panels type and quantity: • Unisolar Thin Film Amorphous Silicon Panels • 1210 – Power...Successfully Demonstrating an Integrated Roofing and BIPV Solution for an Historic Building Renovation at the United States Air Force Academy
Choosing to Win: How Sof Can Better Select Partners for Capacity Building
2014-06-01
countries will yield the best results when SOF are employed to build capacity. This thesis uses two RAND reports—What Works Best When Building...environment, planners will be forced to make difficult decisions about which countries will yield the best results when SOF are employed to build...deliberate planning, global posture, global force management, and nuclear weapons planning.20 The GEF also directs the combatant commanders to
3. TEST AREA 1115, OVERVIEW. AT RIGHT IS BUILDING 8647, ...
3. TEST AREA 1-115, OVERVIEW. AT RIGHT IS BUILDING 8647, TEST STAND 1-4. AT LEFT CENTER, IN THE MIDDLE DISTANCE, IS BUILDING 8668, INSTRUMENTATION AND CONTROL BUILDING FOR TEST AREA 1-115. Looking east from the deck of Test Stand 1-5. (PANORAMA 2/2) - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA
25. Photocopy of engineering drawing, May, 1941 (original drawing located ...
25. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. ELEVATIONS, RIGHT AND LEFT PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
24. Photocopy of engineering drawing, May, 1941 (original drawing located ...
24. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. ELEVATIONS, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
26. Photocopy of engineering drawing, May, 1941 (original drawing located ...
26. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. CROSS-SECTION, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
29. Photocopy of engineering drawing, May, 1941 (original drawing located ...
29. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. 19508 RENOVATION OF FIRST FLOOR, CENTRAL PORTION. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Photocopy of drawing (original drawing of PaintOil & Dope Building ...
Photocopy of drawing (original drawing of Paint-Oil & Dope Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) DETAILS - MacDill Air Force Base, Paint, Oil & Dope Building, 7716 Hanger Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of PaintOil & Dope Building ...
Photocopy of drawing (original drawing of Paint-Oil & Dope Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1940 architectural drawings by Construction Division, Office of the Quartermaster General) PLAN AND ELEVATIONS - MacDill Air Force Base, Paint, Oil & Dope Building, 7716 Hanger Loop Drive, Tampa, Hillsborough County, FL
2008-08-21
CAPE CANAVERAL, Fla. – A member of the "ride-out crew," a group of emergency personnel, at NASA's Kennedy Space Center monitors effects from Tropical Storm Fay. In the background is the Operations Support Building I in the Launch Complex 39 Area. The storm passed over the center Aug. 20 and then stalled offshore, bringing with it heavy rain and tropical storm force wind. Kennedy closed Aug. 19 because of Fay and reopened for normal operations Aug. 22. Based on initial assessments, there was no damage to space flight hardware, such as the space shuttles and Hubble Space Telescope equipment. Some facilities did sustain minor damage. Photo credit: NASA/Jack Pfaller
2012-10-01
inss short, multinational skills have reached an all time high, though there is more road ahead than already traveled . However, this accrued wealth of...training centers such as the bilateral U.S.- Romanian Joint Task Force– East at Kogalniceanu Airbase Romania. Stand up a U.S. Corps Forward Element in...which facilitates practical cooperation downstream, either within NATO or in any coalition operations. Increase U.S. and Allied Exchange Students
What Is Building Partner Capacity Issues for Congress
2015-12-18
the United States mitigate risks associated with diverging interests? If so, how? Does the partner have legitimate institutions of governance and...operations in Iraq and Afghanistan, though, perhaps the key phrase is using BPC to “reduce risk to U.S. forces and extend security to areas we cannot...endeavor. This is due to a variety of reasons. In the first instance, as a 2013 RAND study argued, data limitations, lack of assessments , and the long
A New Vector for Air Force Development of Joint Leaders
2010-05-26
congressional sanction and a formal definition by the President, the JCS was comprised of the US counterparts to the British leaders of the army, navy, and...hostages held in the US Embassy in Tehran. The operation ended in disaster at the Desert One landing zone when a Navy helicopter piloted by marines...minded, critical thinkers.” The CJCS vision focuses building a pool of joint generalists by inculcation of jointness at the rank of colonel and
Educating Special Forces Junior Leaders for a Complex Security Environment
2009-07-01
Security Environment 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK...UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Joint Special Operations University,357 Tully Street Alison Building,Hurlburt Field,FL...32544 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME( S ) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM( S ) 11. SPONSOR
VOC Emission Reduction Study at the Hill Air Force Base Building 515 Painting Facility
1990-09-01
occurs during painting. A system for decreasing the flow to a downstream VOC emission control device can be designed that takes advantage of this...paint application process. A flow-reducing ventilation system that takes advantage of this operating characteristic can be designed in which the...flow from the second duct is vented to a VOC emission control device. The advantage of this system is that the flow rate to a VOC emission contro
Corporate good citizenship pays off in Central America.
1974-07-22
Fear of expropriation and increasing public scrutiny of the activities of multinational companies are forcing these companies to develop social programs in the countries where they operate. Frequently these programs are viewed as products of colonialism or as veiled attempts to dominate the nationals employed by these companies. The United Brands Company, which is involved in large scale banana production in several Central American countries, has adopted a program which seeks to reduce the paternalism which was associated with the operations of the United Fruit Company, the predecessor of the United Brands Company. A series of new programs emphasizing community self help projects were developed by a company-hired sociologist and initiated 4 years ago. In Panama, the projects were started by holding town meetings in which the citizens decided what projects to pursue. With company help the community has begun to build recreational and educational facilities and are also building new docks. The company is contributing $10 million annually to promote these projects. Other programs involve selling homes to workers for half the cost of constructing these homes and increasing efforts to put host country citizens into management positions. Home ownership is expected to stabilize the work force and increased opportunities for advancement are expected to increase productivity. Future plans include the construction of technical schools which will provide a pool of skilled technicians needed by the banana company.
77 FR 34056 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... Area New Mexico 3 Buildings Kirtland AFB Kirtland AFB NM 87117 Landholding Agency: Air Force Property...: Secured Area New Mexico Bldg. 30116 5801 Manzano St SE Kirtland AFB NM 87117 Landholding Agency: Air Force... Buildings Kirtland AFB Kirtland AFB NM 87117 Landholding Agency: Air Force Property Number: 18201220013...
2018-05-01
The 2017 class of astronaut candidates tour Boeing's Commercial Crew and Cargo Facility at NASA's Kennedy Space Center in Florida on May 1. They are at the center for a familiarization tour of facilities, including the Neil Armstrong Operations and Checkout Building high bay; the Launch Control Center, Launch Complex 39B, and the Vehicle Assembly Building. They also toured United Launch Alliance's Space Launch Complex 41 at Cape Canaveral Air Force Station, and SpaceX's Launch Complex 39A at Kennedy. The candidates will spend about two years getting to know the space station systems and learning how to spacewalk, speak Russian, control the International Space Station's robotic arm and fly T-38s, before they're eligible to be assigned to a mission.
2018-05-01
The 2017 class of astronaut candidates arrive at Boeing's Commercial Crew and Cargo Facility at NASA's Kennedy Space Center in Florida on May 1. They are at the center for a familiarization tour of facilities, including the Neil Armstrong Operations and Checkout Building high bay; the Launch Control Center, Launch Complex 39B, and the Vehicle Assembly Building. They also toured United Launch Alliance's Space Launch Complex 41 at Cape Canaveral Air Force Station, and SpaceX's Launch Complex 39A at Kennedy. The candidates will spend about two years getting to know the space station systems and learning how to spacewalk, speak Russian, control the International Space Station's robotic arm and fly T-38s, before they're eligible to be assigned to a mission.
Radiation Control Coatings Installed on Federal Buildings at Tyndall Air Force Base
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kaba, R.L.; Petrie, T.W.
1999-03-16
The technical objectives of this CRADA comprise technology deployment and energy conservation efforts with the radiation control coatings industry and the utility sector. The results of this collaboration include a high-level data reporting, analysis and management system to support the deployment efforts. The technical objectives include successfully install, commission, operate, maintain and document the performance of radiation control coatings on roofs at Tyndall AFB and the Buildings Technology Center at the Oak Ridge National Laboratory; determine the life cycle savings that can be achieved by using radiation control coatings on entire roofs at Tyndall AFB, based on documented installed costmore » and operating maintenance costs with and without the coatings; determine if any specific improvements are required in the coatings before they can be successfully deployed in the federal sector; determine the most effective way to facilitate the widespread and rapid deployment of radiation control coatings in the federal sector; and clearly define any barriers to deployment.« less
Numerical verification of composite rods theory on multi-story buildings analysis
NASA Astrophysics Data System (ADS)
El-Din Mansour, Alaa; Filatov, Vladimir; Gandzhuntsev, Michael; Ryasny, Nikita
2018-03-01
In the article, a verification proposal of the composite rods theory on the structural analysis of skeletons for high-rise buildings. A testing design model been formed on which horizontal elements been represented by a multilayer cantilever beam operates on transverse bending on which slabs are connected with a moment-non-transferring connections and a multilayer columns represents the vertical elements. Those connections are sufficiently enough to form a shearing action can be approximated by a certain shear forces function, the thing which significantly reduces the overall static indeterminacy degree of the structural model. A system of differential equations describe the operation mechanism of the multilayer rods that solved using the numerical approach of successive approximations method. The proposed methodology to be used while preliminary calculations for the sake of determining the rigidity characteristics of the structure; are needed. In addition, for a qualitative assessment of the results obtained by other methods when performing calculations with the verification aims.
2. SOUTHEAST SIDE AND NORTHEAST REAR. SHOP BUILDING IN DISTANCE. ...
2. SOUTHEAST SIDE AND NORTHEAST REAR. SHOP BUILDING IN DISTANCE. NOTE CONCRETE PROTECTION SLAB FOR UNDERGROUND CONTROL ROOM AND ESCAPE HATCH ON GROUND AT RIGHT MIDDLE DISTANCE. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
21. Photocopy of engineering drawing, May, 1941 (original drawing located ...
21. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. SECOND FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
18. Photocopy of engineering drawing, May, 1941 (original drawing located ...
18. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. FIRST FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
27. Photocopy of engineering drawing, May, 1941 (original drawing located ...
27. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. CROSS-SECTION, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
22. Photocopy of engineering drawing, May, 1941 (original drawing located ...
22. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. THIRD FLOOR AND ROOF PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
16. Photocopy of engineering drawing, May, 1941 (original drawing located ...
16. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. BASEMENT FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
17. Photocopy of engineering drawing, May, 1941 (original drawing located ...
17. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. BASEMENT FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
20. Photocopy of engineering drawing, May, 1941 (original drawing located ...
20. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. SECOND FLOOR PLAN, CENTRAL PORTION AND TEST CELLS 1-4. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
19. Photocopy of engineering drawing, May, 1941 (original drawing located ...
19. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. FIRST FLOOR PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
[Influence of the space layout of a surgical department on use efficiency].
Weiss, G; von Baer, R; Riedl, S
2002-02-01
There is a growing gap between the rapidly increasing diagnostic and therapeutic opportunities and the patient demands on one side and the continuously declining hospital budgets on the other side. This gap forces hospitals to search for rationalization potentials and ways to increase their efficiency. It is well known that the operating theatre unit is one of the most important internal cost factors. Many reorganization projects therefore focus on operating theatres. In Germany, several alternative operating room layouts have been developed in order to reduce running und building costs and to reach a high degree of flexibility in their everyday use by means of an improved design. This article analyses and compares the classic operating room and four alternative layouts intended to make them suitable for reaching the promised objectives and, especially, achieving an economically run business management. Furthermore, preferred layouts for certain types of operations are recommended.
View of building 11070 showing vents and forced air system ...
View of building 11070 showing vents and forced air system on east side, looking southwest. - Naval Ordnance Test Station Inyokern, China Lake Pilot Plant, Maintenance Shop, C Street, China Lake, Kern County, CA
Building 904, oblique view to southeast, 135 mm lens. ...
Building 904, oblique view to southeast, 135 mm lens. - Travis Air Force Base, Base Spares Warehouse No. 1, Dixon Avenue & W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Building 904, oblique view to northwest, 135 mm lens ...
Building 904, oblique view to northwest, 135 mm lens - Travis Air Force Base, Base Spares Warehouse No. 1, Dixon Avenue & W Street, Armed Forces Special Weapons Project Q Area, Fairfield, Solano County, CA
Integration of a Self-Coherence Algorithm into DISAT for Forced Oscillation Detection
DOE Office of Scientific and Technical Information (OSTI.GOV)
Follum, James D.; Tuffner, Francis K.; Amidan, Brett G.
2015-03-03
With the increasing number of phasor measurement units on the power system, behaviors typically not observable on the power system are becoming more apparent. Oscillatory behavior on the power system, notably forced oscillations, are one such behavior. However, the large amounts of data coming from the PMUs makes manually detecting and locating these oscillations difficult. To automate portions of the process, an oscillation detection routine was coded into the Data Integrity and Situational Awareness Tool (DISAT) framework. Integration into the DISAT framework allows forced oscillations to be detected and information about the event provided to operational engineers. The oscillation detectionmore » algorithm integrates with the data handling and atypical data detecting capabilities of DISAT, building off of a standard library of functions. This report details that integration with information on the algorithm, some implementation issues, and some sample results from the western United States’ power grid.« less
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- Participants in the prelaunch news conference at Vandenberg Air Force Base, Calif., for NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft prepare to address members of the news media gathered at Vandenberg Air Force Base, Calif. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
Learning a trajectory using adjoint functions and teacher forcing
NASA Technical Reports Server (NTRS)
Toomarian, Nikzad B.; Barhen, Jacob
1992-01-01
A new methodology for faster supervised temporal learning in nonlinear neural networks is presented which builds upon the concept of adjoint operators to allow fast computation of the gradients of an error functional with respect to all parameters of the neural architecture, and exploits the concept of teacher forcing to incorporate information on the desired output into the activation dynamics. The importance of the initial or final time conditions for the adjoint equations is discussed. A new algorithm is presented in which the adjoint equations are solved simultaneously (i.e., forward in time) with the activation dynamics of the neural network. We also indicate how teacher forcing can be modulated in time as learning proceeds. The results obtained show that the learning time is reduced by one to two orders of magnitude with respect to previously published results, while trajectory tracking is significantly improved. The proposed methodology makes hardware implementation of temporal learning attractive for real-time applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the amended remedial action for Operable Units 3, 4, and 5 (OUs 3, 4, and 5) at Eielson Air Force Base (AFB). This decision is based on the Administrative Record for OU 3, 4, and 5, updated in July 1998, to include new information generated since the original Record of Decision was signed on 30 September 1995 (PB95-964618). This amendment applies to OU3 site DP44 (Battery Shop Leach Field Building), OU4 sites SS35 (Asphalt Mixing Area) and ST58 (Old Quartermaster Service Station), and OU5 sites LF03/FT09 (Current Inactive Base Landfill/Fire Training Area). Through new information, contaminantmore » levels than interpreted prior to signing the original ROD document. Proper enforcement of Institutional Controls (IC`s) at all sites will be effective in controlling and restricting access to contaminated media at the sites remediation goals are achieved.« less
2012-05-01
species from construction and demolition activities would be less than significant. The burrowing owl (Athene cunicularia) is the only species of concern...listed by the U.S. Fish and Wildlife Service (USFWS) 5 in the vicinity. There are no known burrowing owl nests within the Building 30116 or... burrow damage) or indirectly impact (e.g., noise disturbances) burrowing owls under the Proposed Action. Surveys prior to construction and flagging
1976-07-01
experimental operations, one assesses the realibility of his data in terms of its repeatability. In fact, during the present experiments an effort was... Data Handler Documentation, lIT Research Institute, September 1974 9. Brindley, A.E., et al, Analysis , Test and Evaluation Support to the USAF Advanced...surface above the building foundation level. A.6.3 SURVEYING TECHNIQUE. ACCUKACY, FUTURE USLU An accuracy analysis was not run on the survey data , but
Credit WCT. Original 21/4"x21/4" color negative is housed in the ...
Credit WCT. Original 2-1/4"x2-1/4" color negative is housed in the JPL Photography Laboratory, Pasadena, California. This interior view of the Xray chamber shows operator Leonard "Dutch" Sebring positioning the 1 million electron volt X-ray machine to make an image of a Syncom 2 motor (JPL negative no. JPL-10285BC, 27 January 1989) - Jet Propulsion Laboratory Edwards Facility, Radiographic Inspection Building, Edwards Air Force Base, Boron, Kern County, CA
2013-04-15
are required. For example exploring MAGTF deployments on Littoral Combat Ships or building GCE , LCE, and ACE units that support company level ...objective raids that is likely due to the level of training and in the case of peace enforcement it is likely due to the regional focus of SOF...formed the SOF units and task forces over this period. The inherent “jointness” of USSOCOM is apparent at the lowest tactical level which contrasts
2008-10-31
participation based on the two benefits previously listed. The nature of the partnership must now be determined. Will it be a coalition of equals or...will a single nation direct the organization? The answer to this question is summed up excellently in a quote from Dr. Carlos Manuel de Céspedes...the fundamental bases of international cooperation. That equality is in its turn founded upon a mutual respect, no matter how the military force or
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-07
NOAA Administrator, Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.), left, NASA Administrator Michael Griffin and Under Secretary of the Air Force Dr. Ronald Sega, right, testify before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
House Hearing Nunn-McCurdy Review of NPOESS
2006-06-08
NOAA Administrator, Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.), left, NASA Administrator Michael Griffin and Under Secretary of the Air Force Dr. Ronald Sega, right, testify before the House Committee on Science and Technology regarding the future of the National Polar-orbiting Operational Environmental Satellite System (NPOESS) and results of the Nunn-McCurdy review of NOAA’s weather satellite program, Thursday, June 8, 2006, at the Rayburn House Office Building in Washington. Photo Credit: (NASA/Bill Ingalls)
29. VIEW OF 1959 KOLLMORGEN BUNKER PERISCOPE LOCATED IN NORTHEAST ...
29. VIEW OF 1959 KOLLMORGEN BUNKER PERISCOPE LOCATED IN NORTHEAST CORNER OF SLC-3W CONTROL ROOM. NOTE SCHRADER VALVE ABOVE HANDLE ON RIGHT SIDE OF PERISCOPE. MONITOR LABELED '1-FLAMEBUCKET' IN BACKGROUND TO LEFT OF PERISCOPE. DIGITAL COUNTDOWN AND HOLD CLOCKS IMMEDIATELY ABOVE MONITOR. ANOTHER DIGITAL COUNTDOWN CLOCK AND THE MILITARY TIME CLOCK ON NORTH WALL BENEATH THE MONITOR. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
90. VIEW OF OXIDIZER APRON AND SOUTH SIDE OF SKID ...
90. VIEW OF OXIDIZER APRON AND SOUTH SIDE OF SKID 9, SKID 7, AND SKID 9A. COOLING TOWER ON NORTH SIDE OF OXIDIZER APRON. LEFT TO RIGHT IN BACKGROUND: METEOROLOGICAL TOWER, SLC-3W MST, SURPLUS ATLAS E/F LAUNCHER, PYROTECHNIC SHED (BLDG. 757), STORAGE SHED (BLDG. 776), CABLE TRAYS, AND TOP OF LAUNCH OPERATIONS BUILDING (BLDG. 763). - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Air Force Civil Engineer, Volume 10, Number 1, Spring 2002
2002-01-01
gone into the 823rd Expeditionary RED HORSE Squadron�s military construction (MILCON) funded ramp project at Al Udeid Air Base, Qatar , and the main...AE W P ub lic A ff ai rs an Air Base RED HORSE builds MILCON project in Qatar SSgt Chuck Risinger, 823rd RHS, operates a slip form paver March 24...and were not designed to limit or contain the migration of lead into the environ- ment and sub-surface groundwater aquifers . An estimated 2,000
81. THREE ADDITIONAL BLACK AND WHITE VIDEO MONITORS LOCATED IMMEDIATELY ...
81. THREE ADDITIONAL BLACK AND WHITE VIDEO MONITORS LOCATED IMMEDIATELY WEST OF THOSE IN CA-133-1-A-80. COMPLEX SAFETY WARNING LIGHTS FOR SLC-3E (PAD 2) AND BLDG. 763 (LOB) LOCATED ABOVE MONITOR 3; GREEN LIGHTS ON BOTTOM OF EACH STACK ILLUMINATED. LEFT TO RIGHT BELOW MONITORS: ACCIDENT REPORTING EMERGENCY NOTIFICATION SYSTEM TELEPHONE, ATLAS H FUEL COUNTER, AND DIGITAL COUNTDOWN CLOCK. - Vandenberg Air Force Base, Space Launch Complex 3, Launch Operations Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
1988-03-31
MARCI 1988 iAm U m WI 4EUnclT CLSIIAION OF THIS PAGE REPORT DOCUMENTATION PAGE is REPORT SECURITY CLASSIFICATION lb. RESTRICTIVE MARKINGS 2.. SECUR ...logistics system of the future more capable of supporting the full spectrumn of war 20 OISTRIaSUTION.’AVAILAeILiTY 0" ABSTRACT 21 ABSTRACT SECURITY ... SECURITY CLASSIFICATION OT: THIS PAGF Unclas ’SCUFUTY Cý= I!FICATION OF THIS PAGE 1,Qwcont.) scenarios. Today’s logistics processes assume wartime
Intrinsic Remediation Treatability Study for Site ST-29 Patrick Air Force Base, Florida
1995-08-01
of the northeast/southwest (NE/SW) runway. The BX Service Station has been in operation since 1954. The site consists of a small food market (Building... UCg /1 0 86-4-MWD .09 12.4 1.47 0 86-5-MWS .17 23.6 6.86 86-7 .12 30.2 2.52 86-8 .10 44.7 8.51 86-9-MWD .11 34.7 15.3 86-9-MWD Dup .11 86-9-MWS .10
23. Photocopy of engineering drawing, May, 1941 (original drawing located ...
23. Photocopy of engineering drawing, May, 1941 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering vault). ENGINE TEST CELL BUILDING. THIRD FLOOR AND ROOF PLAN, RIGHT AND LEFT END PORTIONS, TEST CELLS 5-12. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
A consistent model for tsunami actions on buildings
NASA Astrophysics Data System (ADS)
Foster, A.; Rossetto, T.; Eames, I.; Chandler, I.; Allsop, W.
2016-12-01
The Japan (2011) and Indian Ocean (2004) tsunami resulted in significant loss of life, buildings, and critical infrastructure. The tsunami forces imposed upon structures in coastal regions are initially due to wave slamming, after which the quasi-steady flow of the sea water around buildings becomes important. An essential requirement in both design and loss assessment is a consistent model that can accurately predict these forces. A model suitable for predicting forces in the in the quasi-steady range has been established as part of a systematic programme of research by the UCL EPICentre to understand the fundamental physical processes of tsunami actions on buildings, and more generally their social and economic consequences. Using the pioneering tsunami generator at HR Wallingford, this study considers the influence of unsteady flow conditions on the forces acting upon a rectangular building occupying 10-80% of a channel for 20-240 second wave periods. A mathematical model based upon basic open-channel flow principles is proposed, which provides empirical estimates for drag and hydrostatic coefficients. A simple force prediction equation, requiring only basic flow velocity and wave height inputs is then developed, providing good agreement with the experimental results. The results of this study demonstrate that the unsteady forces from the very long waves encountered during tsunami events can be predicted with a level of accuracy and simplicity suitable for design and risk assessment.
WEAPONS STORAGE AREA, LOOKING TOWARD ELECTRIC POWER STATION BUILDING (BUILDING ...
WEAPONS STORAGE AREA, LOOKING TOWARD ELECTRIC POWER STATION BUILDING (BUILDING 3583), STORAGE BUILDING (BUILDING 3584)NIGHT AND SECURITY POLICE ENTRY CONTROL (BUILDING 3582)LEFT. VIEW TO NORTHEAST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.
2008-08-01
RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.
NASA Astrophysics Data System (ADS)
Bitaraf, Maryam; Ozbulut, Osman E.; Hurlebaus, Stefan
2010-04-01
This paper investigates the effectiveness of two adaptive control strategies for modulating control force of piezoelectric friction dampers (PFDs) that are employed as semi-active devices in combination with laminated rubber bearings for seismic protection of buildings. The first controller developed in this study is a direct adaptive fuzzy logic controller. It consists of an upper-level and a sub-level direct fuzzy controller. In the hierarchical control scheme, higher-level controller modifies universe of discourse of both premise and consequent variables of the sub-level controller using scaling factors in order to determine command voltage of the damper according to current level of ground motion. The sub-level fuzzy controller employs isolation displacement and velocity as its premise variables and command voltage as its consequent variable. The second controller is based on the simple adaptive control (SAC) method, which is a type of direct adaptive control approach. The objective of the SAC method is to make the plant, the controlled system, track the behavior of the structure with the optimum performance. By using SAC strategy, any change in the characteristics of the structure or uncertainties in the modeling of the structure and in the external excitation would be considered because it continuously monitors its own performance to modify its parameters. Here, SAC methodology is employed to obtain the required force which results in the optimum performance of the structure. Then, the command voltage of the PFD is determined to generate the desired force. For comparison purposes, an optimal controller is also developed and considered in the simulations together with maximum passive operation of the friction damper. Time-history analyses of a base-isolated five-story building are performed to evaluate the performance of the controllers. Results reveal that developed adaptive controllers can successfully improve seismic response of the base-isolated buildings against various types of earthquakes.
28. Ventilation Building located on front lawn of building 500, ...
28. Ventilation Building located on front lawn of building 500, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
58. Corridor, building 500 to building 515, basement level, looking ...
58. Corridor, building 500 to building 515, basement level, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
29. Ventilation Building located on front lawn of building 500, ...
29. Ventilation Building located on front lawn of building 500, looking northeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
2. BUILDING 8767, SOUTH FRONT AND EAST SIDE. Edwards ...
2. BUILDING 8767, SOUTH FRONT AND EAST SIDE. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
7. MOTION PICTURE CAMERA STAND AT BUILDING 8768. Edwards ...
7. MOTION PICTURE CAMERA STAND AT BUILDING 8768. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
6. BUILDING 8768, NORTHWEST SIDE AND SOUTHWEST FRONT. Edwards ...
6. BUILDING 8768, NORTHWEST SIDE AND SOUTHWEST FRONT. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
8. BUILDING 8769, WEST FRONT AND SOUTH SIDE. Edwards ...
8. BUILDING 8769, WEST FRONT AND SOUTH SIDE. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Assessment of Structural Resistance of building 4862 to Earthquake and Tornado Forces [SEC 1 and 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
METCALF, I.L.
1999-12-06
This report presents the results of work done for Hanford Engineering Laboratory under contract Y213-544-12662. LATA performed an assessment of building 4862 resistance to earthquake and tornado forces.
Burke, F J; Shaglouf, A G; Combe, E C; Wilson, N H
2000-01-01
Core build-ups should provide satisfactory strength and resistance to fracture both before and after crown preparation. This paper examines the resistance to fracture of core build-ups in different materials and the fracture resistance of core build-ups when these have been reduced for full crown preparation. Standardized core build-ups were made on groups of extracted molar teeth of similar size, with 10 teeth per group. Three resin-composite (prisma APH: Dentsply, Weybridge, UK; Ti-Core, Essential Dental Systems, NJ, US and Coradent, Vivadent, Liechtenstein), one cermet (Ketac-Silver, ESPE GmbH, Seefeld, Germany) and one amalgam material (Duralloy, Degussa Ltd, Cheshire, UK). These specimens were subjected to compressive force on a universal testing machine and the force at fracture noted. Standardized full crown preparations were made on a further five groups of core build-up specimens using the same materials as above. These prepared specimens were subjected to compressive force on a universal testing machine and the force to fracture noted. The results indicated that amalgam core build-ups demonstrated higher fracture resistance than the other materials examined. There was a general decrease in the fracture strength of the specimens following crown preparation, with the teeth restored with the amalgam core build-ups showing a greater percentage reduction in fracture strength than the other materials tested. Prepared core build-ups in a hybrid composite material provided the highest fracture resistance. The cermet material used provided the lowest resistance to fracture in both the core build-up and crown preparation specimens. In terms of fracture resistance, no advantage was apparent in using the two composite materials designated as being specifically appropriate for core build-ups.
1. GENERAL VIEW OF OBSERVATION BUNKERS TO THE EAST OF ...
1. GENERAL VIEW OF OBSERVATION BUNKERS TO THE EAST OF TEST STAND 1-A: IN FOREGROUND, BUILDING 8769, A TWO WINDOW DESIGN (NOT ON SITE PLAN); IN THE MIDDLE DISTANCE, BUILDING 8768, A ONE WINDOW DESIGN "OBSERVATION AND CAMERA BUILDING NO. 2" ON SITE PLAN; IN THE DISTANCE, AT FAR LEFT, BUILDING 8767, A FOUR WINDOW DESIGN "MASTER OBSERVATION AND CAMERA BUILDING NO. 1" ON SITE PLAN. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Credit BG. View looks south southeast (162°) across foundation of ...
Credit BG. View looks south southeast (162°) across foundation of Building 4332 Warehouse "B" (formerly T-81). Top of foundation for Building 4332 Warehouse "A" is visible at extreme left of view. In remote distance are buildings at Main Base, Edwards Air Force Base - Edwards Air Force Base, North Base, Warehouse B, Second Street at E Street, Boron, Kern County, CA
A Sixty-Year Timeline of the Air Force Maui Optical and Supercomputing Site
2013-01-01
19.3 million dollar contract to Contraves USA to build the AEOS 3.67-m telescope. Site Management Duffner, 2009 May 1992 The Air Force approves...system. Site Management Oder, undated Dec 18 1996 Contraves completes factory testing of AEOS telescope at its plant in Pennsylvania...States. Dec 13 1991 The Air Force awards a $19.3 million dollar contract to Contraves USA to build the AEOS 3.67-m telescope. May 1992 The Air Force
Space Separatism: Degree of Differentiation
2014-12-01
Separate Service” (Norfolk, VA: Joint Forces Staff College, 6 September 2002); MAJ William S. Moncrief , “Building a United States Space Force,” Army Space...unclassified b. ABSTRACT unclassified c . THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 November–December 2014 Air...FY14_Green_Book.pdf. 32. Story, “Separate Space Force,” 2–5. 33. Moncrief , “Building a United States Space Force,” 34–38. 34. DODD 3100.10, Space Policy, 3. 35. Lt
Afghanistan’s Local War: Building Local Defense Forces
2010-01-01
Afghanistan’s Local War: Building Local Defense Forces economic and other development conditions. As the Nobel Prize- winning economist Amartya Sen ...strengthen warlords 9 Amartya Sen , Development as Freedom, New York: Anchor Books, 2000, p. 11. Mitigating Risks 77 • weaken central government forces...Taliban Afghanistan, Bonn: Bonn International Center for Conversion, 2002. Sen , Amartya , Development as Freedom, New York: Anchor Books, 2000. Shahrani
POST Earthquake Debris Management — AN Overview
NASA Astrophysics Data System (ADS)
Sarkar, Raju
Every year natural disasters, such as fires, floods, earthquakes, hurricanes, landslides, tsunami, and tornadoes, challenge various communities of the world. Earthquakes strike with varying degrees of severity and pose both short- and long-term challenges to public service providers. Earthquakes generate shock waves and displace the ground along fault lines. These seismic forces can bring down buildings and bridges in a localized area and damage buildings and other structures in a far wider area. Secondary damage from fires, explosions, and localized flooding from broken water pipes can increase the amount of debris. Earthquake debris includes building materials, personal property, and sediment from landslides. The management of this debris, as well as the waste generated during the reconstruction works, can place significant challenges on the national and local capacities. Debris removal is a major component of every post earthquake recovery operation. Much of the debris generated from earthquake is not hazardous. Soil, building material, and green waste, such as trees and shrubs, make up most of the volume of earthquake debris. These wastes not only create significant health problems and a very unpleasant living environment if not disposed of safely and appropriately, but also can subsequently impose economical burdens on the reconstruction phase. In practice, most of the debris may be either disposed of at landfill sites, reused as materials for construction or recycled into useful commodities Therefore, the debris clearance operation should focus on the geotechnical engineering approach as an important post earthquake issue to control the quality of the incoming flow of potential soil materials. In this paper, the importance of an emergency management perspective in this geotechnical approach that takes into account the different criteria related to the operation execution is proposed by highlighting the key issues concerning the handling of the construction and demolition debris following an earthquake.
POST Earthquake Debris Management - AN Overview
NASA Astrophysics Data System (ADS)
Sarkar, Raju
Every year natural disasters, such as fires, floods, earthquakes, hurricanes, landslides, tsunami, and tornadoes, challenge various communities of the world. Earthquakes strike with varying degrees of severity and pose both short- and long-term challenges to public service providers. Earthquakes generate shock waves and displace the ground along fault lines. These seismic forces can bring down buildings and bridges in a localized area and damage buildings and other structures in a far wider area. Secondary damage from fires, explosions, and localized flooding from broken water pipes can increase the amount of debris. Earthquake debris includes building materials, personal property, and sediment from landslides. The management of this debris, as well as the waste generated during the reconstruction works, can place significant challenges on the national and local capacities. Debris removal is a major component of every post earthquake recovery operation. Much of the debris generated from earthquake is not hazardous. Soil, building material, and green waste, such as trees and shrubs, make up most of the volume of earthquake debris. These wastes not only create significant health problems and a very unpleasant living environment if not disposed of safely and appropriately, but also can subsequently impose economical burdens on the reconstruction phase. In practice, most of the debris may be either disposed of at landfill sites, reused as materials for construction or recycled into useful commodities Therefore, the debris clearance operation should focus on the geotechnical engineering approach as an important post earthquake issue to control the quality of the incoming flow of potential soil materials. In this paper, the importance of an emergency management perspective in this geotechnical approach that takes into account the different criteria related to the operation execution is proposed by highlighting the key issues concerning the handling of the construction and demolition debris following an earthquake.
The Space Shuttle Decision: NASA's Search for a Reusable Space Vehicle
NASA Technical Reports Server (NTRS)
Heppenheimer, T. A.
1999-01-01
This significant new study of the decision to build the Space Shuttle explains the Shuttle's origins and early development. In addition to internal NASA discussions, this work details the debates in the late 1960s and early 1970s among policymakers in Congress, the Air Force, and the Office of Management and Budget over the roles and technical designs of the Shuttle. Examining the interplay of these organizations with sometimes conflicting goals, the author not only explains how the world's premier space launch vehicle came into being, but also how politics can interact with science, technology, national security, and economics in national government. The weighty policy decision to build the Shuttle represents the first component of the broader story: future NASA volumes will cover the Shuttle's development and operational histories.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
This decision document presents the final remedies for OU3, which consists of 17 sites: No further action for the following 14 NFA (no further action) sites - Ohio Road Debris Area, Oklahoma Road Debris Area, KC-135 Crash Area, Dumpster Cleaning Area Site/Building 7841, Explosive Ordnance Disposal (EOD) Area-Cylinders, Golf Course Maintenance Shed Area, Chapman Pit Debris Area, 9000 Debris Area, Solvent/Paint Dock Area, Prima Beef Debris Area, Buildings 8951 and 8960 (DRMO), Old PX Gas Station UST, F-106A Crash Area, and Demineralization Plant; Further investigation for the Outdoor Firing Range and EOD Range; and Remedial action for the Contract Storagemore » Shed Area site to address the contaminated soils/sediments.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
The Record of Decision presents the selected remedial action for the Oil/Water separator at Building 918 Operable Unit (Site OT 40). There are hazardous substances present in the shallow groundwater at levels below those that would cause risk. Additionally, arsenic and lead exist in soils at levels within regional background levels. The site poses a minimal risk to public health, welfare, and the environment. The No Action alternative requires no actions be taken at the site. This alternative serves as a baseline for comparison and CERCLA requires it be evaluated. It is the preferred alternative at this site because themore » other alternatives offer no substantial advantages.« less
1991-10-01
ks C-12 GATE 660 DUDLEY I 0S813OAO63SBO 111 UUOAISSITE 30 30SAP1 5 A N-N0SRADP19 FNC Q0A1 AAT 3AiO BANG WEB Ll SHALLOW A 3AS 62 AR1L AOIN07AP SCSAPO...SCALE I FEET CHI~AN LINK/SAAMED WIRE FENCE SA29 Figtrio C-GG. Mep o0F SA 29 and Vicinity. C-228 iOrM pOrN AT 1 0 j B. Activity/Area: BUILDING 677...ground water extraction system near Building 666. Furthermore, is a deep boring warranted at each location t4here shallow contamination is found? 3. Site
9. BUILDING 8769, EAST REAR AND NORTH SIDE, TEST STAND ...
9. BUILDING 8769, EAST REAR AND NORTH SIDE, TEST STAND AT RIGHT. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
7. SOUTH REAR. Looking northwest from corner of the Instrumentation ...
7. SOUTH REAR. Looking northwest from corner of the Instrumentation and Control Building (Building 8762). - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
Cybersonics: Tapping into Technology
NASA Technical Reports Server (NTRS)
2001-01-01
With the assistance of Small Business Innovation Research (SBIR) funding from NASA's Jet Propulsion Laboratory, Cybersonics, Inc., developed an ultrasonic drill with applications ranging from the medical industry to space exploration. The drill, which has the ability to take a core sample of the hardest granite or perform the most delicate diagnostic medical procedure, is a lightweight, ultrasonic device made to fit in the palm of the hand. Piezoelectric actuators, which have only two moving parts and no gears or motors, drive the components of the device, enabling it to operate in a wide range of temperatures. The most remarkable aspect of the drill is its ability to penetrate even the hardest rock with minimal force application. The ultrasonic device requires 20 to 30 times less force than standard rotating drills, allowing it to be safely guided by hand during operation. Also, the drill is operable at a level as low as three watts of power, where conventional drills require more than three times this level. Potential future applications for the ultrasonic drill include rock and soil sampling, medical procedures that involve core sampling or probing, landmine detection, building and construction, and space exploration. Cybersonics, Inc. developed an ultrasonic drill with applications ranging from the medical industry to space exploration.
NASA Astrophysics Data System (ADS)
Leneman, David
2001-10-01
We use a Barium Oxide coated cathode to supply accelerated electrons as an energy source to from our plasma. Oxide coated cathodes have been used for decades in vacuum tubes and plasma research. Most of these have been small (1 cm dia.) or designed to operate in a low magnetic field where the J×B \\unboldmath forces on them are negligible. At the new LAPD we will have large diameter plasma sources at both ends of the machine which must operate in a 3.5 kG ambient magnetic field. We have designed and built one such source which is 72 cm in diameter. It will supply up to 20 kA of pulsed beam current and uses a 1 m by 1 m, 2.5 kA (dc), 150 kW heater. Solutions to various engineering issues will be discussed. These pertain to differential thermal expansion over 1 m distances, J×B \\unboldmath forces on the heater and cathode, heat containment and uniformity of the oxide coating and of plasma production. These issues are important to any experimenter who plans to build an oxide coated plasma source.
Building Better Buildings: Sustainable Building Activities in California Higher Education Systems.
ERIC Educational Resources Information Center
Sowell, Arnold; Eichel, Amanda; Alevantis, Leon; Lovegreen, Maureen
2003-01-01
This article outlines the activities and recommendations of California's sustainable building task force, discusses sustainable building activities in California's higher education systems, and highlights key issues that California is grappling with in its implementation of sustainable building practices. (EV)
Credit BG. Northwest and southwest facades of Administration Building for ...
Credit BG. Northwest and southwest facades of Administration Building for Building 4505 area. Construction began on this building in 1967 - Edwards Air Force Base, North Base, Administration Building, Northeast of A Street, Boron, Kern County, CA
5. BUILDING 8768, SOUTH SIDE AND EAST REAR. TEST STAND ...
5. BUILDING 8768, SOUTH SIDE AND EAST REAR. TEST STAND 1A AT LEFT. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
21. Photocopy of engineering drawing, April 10, 1958 (original drawing ...
21. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, RAMP DETAILS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA
20. Photocopy of engineering drawing, April 10, 1958 (original drawing ...
20. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, ELEVATIONS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA
2. BUILDING 8814, NORTH FRONT AND EAST SIDE. Looking south ...
2. BUILDING 8814, NORTH FRONT AND EAST SIDE. Looking south southwest toward water tank complex. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunker 1-D-3, Test Area 1-125, northwest end of Altair Boulevard, Boron, Kern County, CA
GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM LEFT TO RIGHT, ...
GENERAL VIEW OF FLIGHT LINE BUILDINGS. FROM LEFT TO RIGHT, JET ENGINE TEST CELL BUILDING (BUILDING 2820), MAINTENANCE DOCK, FLIGHT SYSTEM (BUILDING 2818)" AND MAINTENANCE DOCK (BUILDING 2793). VIEW TO SOUTHEAST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
Credit BG. Looking southeast at Test Stand "D" (Building 4223/E24). ...
Credit BG. Looking southeast at Test Stand "D" (Building 4223/E-24). Left foreground contains six high-pressure nitrogen tanks which supplied nitrogen for operation of propellant valves. Several tanks for other substances have been removed from the base of the tower as part of decontamination and dismantling program. The vertical vacuum test cell can be seen in the tower behind the western sunscreen. At the top of the tower in the northeast corner is the interstage condenser used in the series of vacuum ejectors; at the top of the condenser is one of two Z-stage ejectors used to evacuate the condenser. The hoist beam for lifting/lowering rocket engines can be clearly seen projecting to the west over the pavement. In the distance on the right are Clayton water-tube steam generators from Building 4280/E-81, and the towers for Test Stand "C" and its scrubber-condenser - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA
[Research on Shielding of Emboli with the Phase-Controlled Ultrasound].
Liu, Chuang; Bai, Jingfeng
2016-01-01
The postoperative neurological complications is associated with intraoperative cerebral emboli, which results from extracorporeal circulation and operation. It can effectively reduce the incidence of neurological complications with ultrasonic radiation. In fluids, a particle will change it's motion trail when it is acted by the radiation force generated by the ultrasound. This article mainly discuss how to shielding emboli with ultrasound. The equipment can transmit phased ultrasonic signals, which is designed on a FPGA development board. The board can generate a square wave, which is converted into a sine wave through a power amplifier. In addition, the control software has been developed on Qt development environment. The result indicates it's feasible to shielding emboli with ultrasonic radiation force. This article builds a strong foundation for the future research.
Contextual view including south (rear) of building 925, exercise in ...
Contextual view including south (rear) of building 925, exercise in foreground, and modern buildings in background. Facing northwest. - Travis Air Force Base, Building No. 925, W Street, Fairfield, Solano County, CA
Credit BG. View looks north northwest (325°) towards Administration Building ...
Credit BG. View looks north northwest (325°) towards Administration Building across aircraft apron east of Building 4505. Building 4507 (Storage Building) appears at extreme right of view - Edwards Air Force Base, North Base, Administration Building, Northeast of A Street, Boron, Kern County, CA
WEAPONS STORAGE AREA. FROM RIGHT TO LEFT, ABOVEGROUND STORAGE MAGAZINE ...
WEAPONS STORAGE AREA. FROM RIGHT TO LEFT, ABOVEGROUND STORAGE MAGAZINE (BUILDING 3568), SPARES INERT STORAGE BUILDING (BUILDING 3570), MISSILE ASSEMBLY SHOP (BUILDING 3578) AND SEGREGATED MAGAZINE STORAGE BUILDING (BUILDING 3572). VIEW TO NORTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
3. BUILDING 8767, NORTH REAR AND WEST SIDE, TEST STAND ...
3. BUILDING 8767, NORTH REAR AND WEST SIDE, TEST STAND 1-A AT FAR RIGHT. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Observation Bunkers for Test Stand 1-A, Test Area 1-120, north end of Jupiter Boulevard, Boron, Kern County, CA
23. Photocopy of engineering drawing, April 10, 1958 (original drawing ...
23. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, UPPER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA
22. Photocopy of engineering drawing, April 10, 1958 (original drawing ...
22. Photocopy of engineering drawing, April 10, 1958 (original drawing located at Fairchild Air Force Base, Civil Engineering Building, Civil Engineering Vault). READINESS CREW BUILDING, LOWER FLOOR PLANS - Fairchild Air Force Base, Bomber Alert Facility, 803G South Taxi Way, Spokane, Spokane County, WA
2. TEST AREA 1115, A VIEW TO THE SOUTHEAST FROM ...
2. TEST AREA 1-115, A VIEW TO THE SOUTHEAST FROM THE DECK OF TEST STAND 1-5. AT RIGHT IS BUILDING 8642, MACHINE SHOP FOR TEST STAND 1-5. AT LEFT IS BUILDING 8649, AND PART OF BUILDING 8647, TEST STAND 1-4, IS VISIBLE TO LEFT OF BLDG. 8649. (PANORAMA 1/2). - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Leuhman Ridge near Highways 58 & 395, Boron, Kern County, CA
7. "CONTROL BUILDING; FLOOR PLAN, ELEVATIONS AND DETAILS." Specifications No. ...
7. "CONTROL BUILDING; FLOOR PLAN, ELEVATIONS AND DETAILS." Specifications No. OC1-59-53; Drawing No. 5841-A-1; D.O. SERIES AW1525/2 Rev. B. Stamped: RECORD DRAWING AS CONSTRUCTED. Below stamp: Contract No. 5619, Rev. B. Date: 7-8-59. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Firing Control Building, Test Area 1-100, northeast end of Test Area 1-100 Road, Boron, Kern County, CA
Designing a library: everyone on the same page?
Ludwig, Logan; Shedlock, James; Watson, Linda; Dahlen, Karen; Jenkins, Carol
2001-01-01
Excerpts are presented from an interview by the Bulletin of the Medical Library Association buildings projects editor with four academic health sciences library directors: one who had recently completed a major library building project and three who were involved in various stages of new building projects. They share their experiences planning for and implementing library-building programs. The interview explores driving forces leading to new library buildings, identifies who should be involved, recalls the most difficult and exciting moments of the building projects, relates what they wished they had known before starting the project, assesses the impact of new library facilities on clients and services, reviews what they would change, and describes forces impacting libraries today and attributes of the twenty-first century library. PMID:11337952
23. SOUTHWEST CORNER OF BUILDING 220 (ENTRY CONTROL BUILDING) IN ...
23. SOUTHWEST CORNER OF BUILDING 220 (ENTRY CONTROL BUILDING) IN ASSEMBLY AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
22. NORTH ELEVATION OF BUILDING 220 (ENTRY CONTROL BUILDING) IN ...
22. NORTH ELEVATION OF BUILDING 220 (ENTRY CONTROL BUILDING) IN ASSEMBLY AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
40. NORTHWEST FRONT ELEVATION OF BUILDING 269 (PAINT BUILDING) IN ...
40. NORTHWEST FRONT ELEVATION OF BUILDING 269 (PAINT BUILDING) IN ASSEMBLY AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
17. NORTHEAST CORNER OF BUILDING 345 (ENTRY CONTROL BUILDING) IN ...
17. NORTHEAST CORNER OF BUILDING 345 (ENTRY CONTROL BUILDING) IN STORAGE AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
The Goodrich 3rd generation DB-110 system: operational on tactical and unmanned aircraft
NASA Astrophysics Data System (ADS)
Iyengar, Mrinal; Lange, Davis
2006-05-01
Goodrich's DB-110 Reconnaissance Airborne Pod for TORnado (RAPTOR) and Data Link Ground Station (DLGS) have been used operationally for several years by the Royal Air Force (RAF). A variant of the RAPTOR DB-110 Sensor System is currently being used by the Japan Maritime Self Defense Force (JMSDF). Recently, the DB-110 system was flown on the Predator B Unmanned Aerial Vehicle (UAV), demonstrating the DB-110 system's utility on unmanned reconnaissance aircraft. The DB-110 is a dual-band EO and IR imaging capability for long, medium, and short standoff ranges, including oblique and over-flight imaging, in a single sensor package. The DB-110 system has also proven performance for real-time high bandwidth data link imagery transmission. Goodrich has leveraged this operational experience in building a 3rd Generation DB-110 system including new Reconnaissance Airborne Pod and Ground System, to be first used by the Polish Air Force. This 3rd Generation system maintains all the capability of the current 2nd Generation DB-110 system and adds several new features. The 3rd Generation system upgrades include an increase in resolution via new focal planes, addition of a third ("super-wide") field of view, and new avionics. This paper summarizes the Goodrich DB-110 3rd Generation System in terms of its basic design and capabilities. Recent demonstration of the DB-110 on the Predator B UAV is overviewed including sample imagery.
2008-08-21
CAPE CANAVERAL, Fla. – Wind and rain from Tropical Storm Fay pummel the area near the Vehicle Assembly Building at NASA's Kennedy Space Center. The storm passed over the center Aug. 20 and then stalled offshore, bringing with it heavy rain and tropical storm force wind. Kennedy closed Aug. 19 because of Fay and reopened for normal operations Aug. 22. Based on initial assessments, there was no damage to space flight hardware, such as the space shuttles and Hubble Space Telescope equipment. Some facilities did sustain minor damage. Photo credit: NASA/Jack Pfaller
2008-08-21
CAPE CANAVERAL, Fla. – Flooding and some tree damage near the Vehicle Assembly Building are results from Tropical Storm Fay at NASA's Kennedy Space Center. The storm passed over the center Aug. 20 and then stalled offshore, bringing with it heavy rain and tropical storm force wind. Kennedy closed Aug. 19 because of Fay and reopened for normal operations Aug. 22. Based on initial assessments, there was no damage to space flight hardware, such as the space shuttles and Hubble Space Telescope equipment. Some facilities did sustain minor damage. Photo credit: NASA/Jack Pfaller
2008-08-21
CAPE CANAVERAL, Fla. – Due to Tropical Storm Fay, the roadside canals and surrounding grounds are flooded at NASA's Kennedy Space Center. In the background is the Vehicle Assembly Building. The storm passed over the center Aug. 20 and then stalled offshore, bringing with it heavy rain and tropical storm force wind. Kennedy closed Aug. 19 because of Fay and reopened for normal operations Aug. 22. Based on initial assessments, there was no damage to space flight hardware, such as the space shuttles and Hubble Space Telescope equipment. Some facilities did sustain minor damage. Photo credit: NASA/Ben Smegelsky
1993-01-01
external parameters such as airflow, temperature, pressure, etc, are measured. Turbine Engine testing generates massive volumes of data at very high...a form that describes the signal flow graph topology as well as specific parameters of the processing blocks in the diagram. On multiprocessor...provides an interface to the symbolic builder and control functions such that parameters may be set during the build operation that will affect the
Building Afghanistan’s Security Forces in Wartime: The Soviet Experience
2011-01-01
weaponry (aircraft, rockets , and thou- sands of Shmel flamethrowers), and funds to pay fighters.16 The Soviets 13 Liakhovskii, 2009. 14 Timofeev...effort to build an effective state in Afghanistan was a failure, prospects for success in developing the security forces of that state were, in retro
Photocopy of drawing (original drawing of Photographic Laboratory Building in ...
Photocopy of drawing (original drawing of Photographic Laboratory Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) PLANS - MacDill Air Force Base, Photographic Laboratory, 7718 Hanger Loop Drive, Tampa, Hillsborough County, FL
50. EAST CORNER OF BUILDING 365 (ARMAMENT TESTING BUILDING) IN ...
50. EAST CORNER OF BUILDING 365 (ARMAMENT TESTING BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
49. NORTHEAST FRONT ELEVATION OF BUILDING 365 (ARMAMENT TESTING BUILDING) ...
49. NORTHEAST FRONT ELEVATION OF BUILDING 365 (ARMAMENT TESTING BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
52. NORTHWEST FRONT ELEVATION OF BUILDING 367 (ADMINISTRATION OFFICE BUILDING) ...
52. NORTHWEST FRONT ELEVATION OF BUILDING 367 (ADMINISTRATION OFFICE BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
NY32649 ELECTRICAL SUBSTATION (BUILDING 2675) AND EDUCATION CENTER (BUILDING 2670) ...
NY-326-49 ELECTRICAL SUBSTATION (BUILDING 2675) AND EDUCATION CENTER (BUILDING 2670) AT NORTH END OF ARIZONA AVENUE. VIEW TO NORTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
24. CONTEXT VIEW OF BUILDING 220 (ENTRY CONTROL BUILDING) LOOKING ...
24. CONTEXT VIEW OF BUILDING 220 (ENTRY CONTROL BUILDING) LOOKING NORTH THROUGH SECURITY GATES. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
16. EAST FRONT ELEVATION OF BUILDING 345 (ENTRY CONTROL BUILDING) ...
16. EAST FRONT ELEVATION OF BUILDING 345 (ENTRY CONTROL BUILDING) IN STORAGE AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
The NOνA Module Factory Quality Assurance System
NASA Astrophysics Data System (ADS)
Smith, Alex; the NOνA Collaboration
The NOνA experiment will measure neutrino oscillations using a long-baseline beam, a ∼220-ton near detector and a ∼14-kiloton far detector. Production of ∼12500 modules to build these detectors is an industrial scale operation requiring careful quality assurance to meet the stringent technical specifications. Unlike a typical industrial operation, this project will use primarily a part time labor force of ∼200 University of Minnesota undergraduate students managed by a small team of full time employees. The quality assurance system is involved in nearly every aspect of the production: assembly, scheduling, training, payroll, materials, machine maintenance, test data, and safety compliance. The quality assurance data collected during the assembly process allows us to quickly identify and correct any problems that arise.
51. BF corridor, (example of older building meeting with new ...
51. BF corridor, (example of older building meeting with new building addition) from outside room BF-6, basement level, building 500, looking south - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
SECURITY GATE FOR WEAPONS STORAGE AREA. FROM LEFT TO RIGHT, ...
SECURITY GATE FOR WEAPONS STORAGE AREA. FROM LEFT TO RIGHT, STORAGE BUILDING (BUILDING 3584), CONVENTIONAL MUNITIONS SHOP (BUILDING 3580), AND SECURITY POLICE ENTRY CONTROL BUILDING (BUILDING 3582). VIEW TO SOUTHWEST - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
42. CONTEXT VIEW LOOKING WEST OF BUILDING 269 (PAINT BUILDING) ...
42. CONTEXT VIEW LOOKING WEST OF BUILDING 269 (PAINT BUILDING) IN ASSEMBLY AREA SHOWING BUILDING 272 (STORAGE STRUCTURE A-2) IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
69. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING SOUTHWEST THROUGH ...
69. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING SOUTHWEST THROUGH DOOR-WAY INTO PLUTONIUM STORAGE AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
51. CONTEXT VIEW LOOKING NORTHWEST OF BUILDING 365 (ARMAMENT TESTING ...
51. CONTEXT VIEW LOOKING NORTHWEST OF BUILDING 365 (ARMAMENT TESTING BUILDING) IN BASE SPARES AREA WITH BUILDING 367 (ADMINISTRATIVE OFFICE BUILDING) IN MIDDLE GROUND AND BUILDING 368 (WAREHOUSE) IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
Design parameters for rotating cylindrical filtration
NASA Technical Reports Server (NTRS)
Schwille, John A.; Mitra, Deepanjan; Lueptow, Richard M.
2002-01-01
Rotating cylindrical filtration displays significantly reduced plugging of filter pores and build-up of a cake layer, but the number and range of parameters that can be adjusted complicates the design of these devices. Twelve individual parameters were investigated experimentally by measuring the build-up of particles on the rotating cylindrical filter after a fixed time of operation. The build-up of particles on the filter depends on the rotational speed, the radial filtrate flow, the particle size and the gap width. Other parameters, such as suspension concentration and total flow rate are less important. Of the four mechanisms present in rotating filters to reduce pore plugging and cake build-up, axial shear, rotational shear, centrifugal sedimentation and vortical motion, the evidence suggests rotational shear is the dominant mechanism, although the other mechanisms still play minor roles. The ratio of the shear force acting parallel to the filter surface on a particle to the Stokes drag acting normal to the filter surface on the particle due to the difference between particle motion and filtrate flow can be used as a non-dimensional parameter that predicts the degree of particle build-up on the filter surface for a wide variety of filtration conditions. c2002 Elsevier Science B.V. All rights reserved.
70. SAC command post construction, building 500, undated Offutt ...
70. SAC command post construction, building 500, undated - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
41. Stratcom History Museum, building 500, looking northeast Offutt ...
41. Stratcom History Museum, building 500, looking northeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
Laboratory and Physical Modelling of Building Ventilation Flows
NASA Astrophysics Data System (ADS)
Hunt, Gary
2001-11-01
Heating and ventilating buildings accounts for a significant fraction of the total energy budget of cities and an immediate challenge in building physics is for the design of sustainable, low-energy buildings. Natural ventilation provides a low-energy solution as it harness the buoyancy force associated with temperature differences between the internal and external environment, and the wind to drive a ventilating flow. Modern naturally-ventilated buildings use innovative design solutions, e.g. glazed atria and solar chimneys, to enhance the ventilation and demand for these and other designs has far outstripped our understanding of the fluid mechanics within these buildings. Developing an understanding of the thermal stratification and movement of air provides a considerable challenge as the flows involve interactions between stratification and turbulence and often in complex geometries. An approach that has provided significant new insight into these flows and which has led to the development of design guidelines for architects and ventilation engineers is laboratory modelling at small-scale in water tanks combined with physical modelling. Density differences to drive the flow in simplified plexiglass models of rooms or buildings are provided by fresh and salt water solutions, and wind flow is represented by a mean flow in a flume tank. In tandom with the experiments, theoretical models that capture the essential physics of these flows have been developed in order to generalise the experimental results to a wide range of typical building geometries and operating conditions. This paper describes the application and outcomes of these modelling techniques to the study of a variety of natural ventilation flows in buildings.
1. GENERAL VIEW OF WEST FACE OF ENTRY CONTROL POINT ...
1. GENERAL VIEW OF WEST FACE OF ENTRY CONTROL POINT (BLDG. 768) SHOWING RELATIVE POSITION TO TECHNICAL SUPPORT BUILDING (BLDG. 762/762A) AND SLC-3 AIR FORCE BUILDING (BLDG. 761) - Vandenberg Air Force Base, Space Launch Complex 3, Entry Control Point, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
5. WEST SIDE, ALSO SHOWING INSTRUMENTATION AND CONTROL BUILDING (BLDG. ...
5. WEST SIDE, ALSO SHOWING INSTRUMENTATION AND CONTROL BUILDING (BLDG. 8668) IN MIDDLE DISTANCE AT LEFT, AND TEST AREAS 1-120 AND 1-125 BEYOND. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-4, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
Photocopy of drawing (original drawing of Photographic Laboratory Building in ...
Photocopy of drawing (original drawing of Photographic Laboratory Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) MAIN ENTRANCE DETAILS - MacDill Air Force Base, Photographic Laboratory, 7718 Hanger Loop Drive, Tampa, Hillsborough County, FL
59. SAC Plaque, front lawn, building 500, looking east ...
59. SAC Plaque, front lawn, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
42. Auditorium, Stratcom History Museum, building 500, looking northeast ...
42. Auditorium, Stratcom History Museum, building 500, looking northeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
INTERIOR OF BUILDING, LOOKING TOWARD FRONT. VIEW TO SOUTHEAST. ...
INTERIOR OF BUILDING, LOOKING TOWARD FRONT. VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
INTERIOR OF BUILDING, LOOKING TOWARD REAR. VIEW TO NORTH ...
INTERIOR OF BUILDING, LOOKING TOWARD REAR. VIEW TO NORTH - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
1987-06-05
the Corps to subdue Sandino and build the Guardia Nacional de Nicaragua. L Taft, William H., and Bacon, Robert. "Cuban Pacification: Report of William...in Nicaragua, the Marines set out to build a professional apolitical force. The new Guardia Nacional de Nicaragua was to subdue the recalcitrant...Guardians of the Dynasty: A History of the U.S. Created Guardia Nacional de Nicaraoua and the Somoza Family. (Maryknoll, N.Y.: Orbis Books, Inc., 1977
1982-12-01
Base 6-26 17 Confirmation Stage Soil PCB Data, Building 112, Griffiss Air Force Base 6-27 18 Analysis of Roof and Oil Samples Building 112, Griffiss...Chlordane Application 46 52 (14) Drywell, Building 219 46 36 (14) PCB Spill at Floyd 46 47 17 Hazardous Waste Storage Area, Lot 69 38 47 18 Waste Oil ...specific anions, oil and grease, pH, and specific conductance. * Prepare a field investigations report delineating the nature and magnitude of
2. EXTERIOR VIEW OF BUILDING 25B (TEST CHAMBER BUILDING) AND ...
2. EXTERIOR VIEW OF BUILDING 25B (TEST CHAMBER BUILDING) AND WIND TUNNEL, LOOKING NORTHWEST (1991). - Wright-Patterson Air Force Base, Area B, Buildings 25 & 24,10-foot & 20-foot Wind Tunnel Complex, Northeast side of block bounded by K, G, Third, & Fifth Streets, Dayton, Montgomery County, OH
71. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING NORTHEAST INTO ...
71. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING NORTHEAST INTO PLUTONIUM STORAGE ROOM SHOWING CUBICLES FOR STORAGE. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
70. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING WEST INTO ...
70. INTERIOR, BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING WEST INTO STORAGE AREA SHOWING THE FOUR STORAGE ROOM ENTRANCES. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
Within compound, from Guard Tower (Building 5762), looking southwest, Technical ...
Within compound, from Guard Tower (Building 5762), looking southwest, Technical Equipment Building (Building 5760) to left, Microwave Tower (associated with Building 5769) and Civil Engineering Storage Building (Building 5766) to left - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
25. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
25. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1930 ZULU TIME, 26 OCTOBER, 1999. MWOC SCREEN ALSO SHOWS RADAR "FACE A" AND "FACE B" ACTIVE STATUS. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, a solid rocket motor for the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite is hoisted up at NASA's Space Launch Complex-2. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, technicians check the position of a solid rocket motor for the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite at NASA's Space Launch Complex-2. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, technicians use a crane to lift a solid rocket motor for the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite at NASA's Space Launch Complex-2. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, technicians use a crane to lift a solid rocket motor for the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite at NASA's Space Launch Complex-2. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, technicians use a crane to lift a solid rocket motor for the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite at NASA's Space Launch Complex-2. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- Tim Dunn, NASA launch director, Kennedy Space Center, Fla., participates in the prelaunch news conference at Vandenberg Air Force Base, Calif., for NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- Andrew Carson, NPP program executive, NASA Headquarters, Washington, DC, participates in the prelaunch news conference at Vandenberg Air Force Base, Calif., for NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- Ken Schwer, NPP project manager, Goddard Space Flight Center, Greenbelt, Md., participates in the prelaunch news conference at Vandenberg Air Force Base, Calif., for NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- A model of the NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft is displayed during the prelaunch news conference at Vandenberg Air Force Base, Calif. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
Mitigating shear lag in tall buildings
NASA Astrophysics Data System (ADS)
Gaur, Himanshu; Goliya, Ravindra K.
2015-09-01
As the height of building increases, effect of shear lag also becomes considerable in the design of high-rise buildings. In this paper, shear lag effect in tall buildings of heights, i.e., 120, 96, 72, 48 and 36 stories of which aspect ratio ranges from 3 to 10 is studied. Tube-in-tube structural system with façade bracing is used for designing the building of height 120 story. It is found that bracing system considerably reduces the shear lag effect and hence increases the building stiffness to withstand lateral loads. Different geometric patterns of bracing system are considered. The best effective geometric configuration of bracing system is concluded in this study. Lateral force, as wind load is applied on the buildings as it is the most dominating lateral force for such heights. Wind load is set as per Indian standard code of practice IS 875 Part-3. For analysis purpose SAP 2000 software program is used.
4. VIEW OF SECURITY GATE LOOKING SOUTHWEST FROM ROOF OF ...
4. VIEW OF SECURITY GATE LOOKING SOUTHWEST FROM ROOF OF BUILDING 8970 (CREW READINESS BUILDING) SHOWING BUILDING 8965 (SECURITY POLICE ENTRY CONTROL BUILDING) IN RIGHT MIDDLE GROUND AND BUILDING 8966 (ELECTRIC POWER STATION BUILDING) IN RIGHT FOREGROUND. - Loring Air Force Base, Alert Area, Southeastern portion of base, east of southern end of runway, Limestone, Aroostook County, ME
23. AERIAL VIEW LOOKING SOUTHEAST AT THE PLUTONIUM OPERATION BUILDINGS ...
23. AERIAL VIEW LOOKING SOUTHEAST AT THE PLUTONIUM OPERATION BUILDINGS 771, 776/777, AND 707. BUILDING 771, IN THE FOREGROUND, WAS BUILT IN 1952 TO HOUSE ALL PLUTONIUM OPERATIONS. BY 1956, BUILDING 771 WAS NO LONGER ADEQUATE FOR PRODUCTION DEMANDS. BUILDING 776/777, TO THE SOUTH OF BUILDING 771, WAS CONSTRUCTED TO HOUSE PLUTONIUM FABRICATION AND FOUNDRY OPERATIONS. PLUTONIUM RECOVERY REMAINED IN BUILDING 771. BY 1967, CONSTRUCTION ON BUILDING 707, TO THE SOUTH OF BUILDING 776/777, BEGAN AS PRODUCTION LEVELS CONTINUED TO EXPAND NECESSITATING THE NEED FOR ADDITIONAL PLUTONIUM FABRICATION SPACE (7/1/69). - Rocky Flats Plant, Bounded by Indiana Street & Routes 93, 128 & 72, Golden, Jefferson County, CO
Operation and design selection of high temperature superconducting magnetic bearings
NASA Astrophysics Data System (ADS)
Werfel, F. N.; Floegel-Delor, U.; Riedel, T.; Rothfeld, R.; Wippich, D.; Goebel, B.
2004-10-01
Axial and radial high temperature superconducting (HTS) magnetic bearings are evaluated by their parameters. Journal bearings possess advantages over thrust bearings. High magnetic gradients in a multi-pole permanent magnet (PM) configuration, the surrounding melt textured YBCO stator and adequate designs are the key features for increasing the overall bearing stiffness. The gap distance between rotor and stator determines the specific forces and has a strong impact on the PM rotor design. We report on the designing, building and measuring of a 200 mm prototype 100 kg HTS bearing with an encapsulated and thermally insulated melt textured YBCO ring stator. The encapsulation requires a magnetically large-gap (4-5 mm) operation but reduces the cryogenic effort substantially. The bearing requires 3 l of LN2 for cooling down, and about 0.2 l LN2 h-1 under operation. This is a dramatic improvement of the efficiency and in the practical usage of HTS magnetic bearings.
71. SAC command post construction, building 500, January 20, 1987 ...
71. SAC command post construction, building 500, January 20, 1987 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
66. SAC command post lobby, building 500, undated, looking southeast ...
66. SAC command post lobby, building 500, undated, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
5. View of front walkway to building 500 looking east ...
5. View of front walkway to building 500 looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
2. REAR ELEVATION OF ENGINE TEST CELL BUILDING. LOOKING SOUTHEAST. ...
2. REAR ELEVATION OF ENGINE TEST CELL BUILDING. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Adaptation of a multi-resolution adversarial model for asymmetric warfare
NASA Astrophysics Data System (ADS)
Rosenberg, Brad; Gonsalves, Paul G.
2006-05-01
Recent military operations have demonstrated the use by adversaries of non-traditional or asymmetric military tactics to offset US military might. Rogue nations with links to trans-national terrorists have created a highly unpredictable and potential dangerous environment for US military operations. Several characteristics of these threats include extremism in beliefs, global in nature, non-state oriented, and highly networked and adaptive, thus making these adversaries less vulnerable to conventional military approaches. Additionally, US forces must also contend with more traditional state-based threats that are further evolving their military fighting strategies and capabilities. What are needed are solutions to assist our forces in the prosecution of operations against these diverse threat types and their atypical strategies and tactics. To address this issue, we present a system that allows for the adaptation of a multi-resolution adversarial model. The developed model can then be used to support both training and simulation based acquisition requirements to effectively respond to such an adversary. The described system produces a combined adversarial model by merging behavior modeling at the individual level with aspects at the group and organizational level via network analysis. Adaptation of this adversarial model is performed by means of an evolutionary algorithm to build a suitable model for the chosen adversary.
41. CONTEXT VIEW LOOKING EAST OF BUILDING 269 (PAINT BUILDING) ...
41. CONTEXT VIEW LOOKING EAST OF BUILDING 269 (PAINT BUILDING) IN ASSEMBLY AREA SHOWING ROW OF IGLOOS IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
Olympic Village thermal energy storage experiment. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fernandes, R.A.; Saylor, C.M.
Four thermal energy storage (TES) systems were operated in identical dormitory-style buildings of the Raybrook Correctional Facility, formerly the housing for the athletes at the 1980 Winter Olympic Games in Lake Placid, New York. The objectives of the project were to assess the ability of these TES systems to be controlled so as to modify load profiles favorably, and to assess the ability to maintain comfortable indoor conditions under those control strategies. Accordingly, the test was designed to evaluate the effect on load profiles of appropriate control algorithms for the TES systems, collect comprehensive TES operating data, and identify neededmore » research and development to improve the effectiveness of the TES systems. The four similar dormitory buildings were used to compare electric slab heating on grade, ceramic brick storage heating, pressurized-hot-water heating, and heat pumps with hot-water storage. In a fifth similar building, a conventional (non-TES) forced air electric resistance heat system was used. The four buildings with TES systems also had electric resistance heating for backup. A remote computer-based monitoring and control system was used to implement the control algorithms and to collect data from the site. For a 25% TES saturation of electric heat customers on the NMPC system, production costs were reduced by up to $2,235,000 for the New York Power Pool. The winter peak load was reduced by up to 223 MW. The control schedules developed were successful in reducing on-peak energy consumption while maintaining indoor conditions as close to the comfort level as possible considering the test environment.« less
7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY ...
7. PHOTOCOPY OF DRAWING (UNDATED PLAN AND SCHEDULE DRAWING BY THE DEPARTMENT OF THE AIR FORCE, SPACE AND MISSILE TEST CENTER) MATERIAL SPECIFICATIONS AND GENERAL NOTES FOR INTERIOR FINISHING FOR BUILDING 762-A, SHEET A4 - Vandenberg Air Force Base, Space Launch Complex 3, Technical Support Building, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-14
... Surplus Buildings and Land at Air Force Research Labs (AFRL) Mesa, Located in Maricopa County, AZ SUMMARY: This notice provides information regarding the surplus property at AFRL Mesa in Maricopa County... to plan the reuse of the AFRL Mesa property. The property is located within the former Williams Air...
Managing Diversity: A Key to Building a Quality Work Force. Research and Development Series No. 271.
ERIC Educational Resources Information Center
Maxson, Judith; Hair, Billy
Economic changes create stress as U.S. businesses progress toward building a high quality work force for the year 2000. Skills such as critical literacy, communication, writing, math, and interpersonal competence are desired. Critical literacy involves the higher order thinking skills: the ability to analyze, evaluate, and synthesize. In addition,…
2016-06-16
procedure. The predictive capabilities of the high-resolution computational fluid dynamics ( CFD ) simulations of urban flow are validated against a very...turbulence over a 2D building array using high-resolution CFD and a distributed drag force approach a Department of Mechanical Engineering, University
A Hands-On Activity to Build Mastery of Intermolecular Forces and Its Impacts on Student Learning
ERIC Educational Resources Information Center
Bruck, Laura B.
2016-01-01
The intermolecular forces activity presented in this article is designed to foster concept-building through students' use of concrete, manipulative objects, and it was developed to be pedagogically sound. Data analysis via pre- and posttesting and subsequent exam questions indicated that students who had the opportunity to participate in the…
Photocopy of drawing (original drawing of Photographic Laboratory Building in ...
Photocopy of drawing (original drawing of Photographic Laboratory Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) FRONT AND RIGHT SIDE ELEVATIONS AND SECTIONS - MacDill Air Force Base, Photographic Laboratory, 7718 Hanger Loop Drive, Tampa, Hillsborough County, FL
Photocopy of drawing (original drawing of Photographic Laboratory Building in ...
Photocopy of drawing (original drawing of Photographic Laboratory Building in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1939 architectural drawings by Construction Division, Office of the Quartermaster General) REAR AND LEFT SIDE ELEVATIONS AND SECTIONS - MacDill Air Force Base, Photographic Laboratory, 7718 Hanger Loop Drive, Tampa, Hillsborough County, FL
1. BUILDING 8698, TEST STAND 13, WEST ELEVATION. NOTE TUNNEL ...
1. BUILDING 8698, TEST STAND 1-3, WEST ELEVATION. NOTE TUNNEL BETWEEN BLDG. 8668 AND TEST STAND 1-3. TEST AREA 1-120 IN THE MIDDLE DISTANCE, AND TEST AREA 1-125 ON THE HORIZON. Looking northeast from the roof of Building 8668, Instrumentation and Control Center. Note: Photograph CA-236-F-2 is an 8" x 10" enlargement from a 4" x 5" negative. This view is a photocopy of a recent resin coated print made from a print held at the Main Base History Office, Edwards Air Force Base, California. Photographer unknown. Date and file number unknown. - Edwards Air Force Base, Air Force Rocket Propulsion Laboratory, Test Stand 1-3, Test Area 1-115, northwest end of Saturn Boulevard, Boron, Kern County, CA
Special Forces Capabilities of the European Union Military Forces
2004-05-26
16 A Review of the History of Special Operations and Special Operations Forces ..... 16 Special Operations Defined...Herzegovina.15 Chapter Two - The Theory Connection - Special Operations and Special Operation Forces This chapter reviews the history and defines...18 Ibid, 87. 19 Ibid, 88. 20 Ibid, 114. 16 Special Operations and Special Operation Forces Theory A Review of the History of Special
5. INTERIOR, INSTRUMENTATION AND CONTROL BUILDING ADDITION. Looking north. ...
5. INTERIOR, INSTRUMENTATION AND CONTROL BUILDING ADDITION. Looking north. - Edwards Air Force Base, South Base Sled Track, Instrumentation & Control Building, South of Sled Track, Station "50" area, Lancaster, Los Angeles County, CA
67. Aerial view of SAC command post, building 500, looking ...
67. Aerial view of SAC command post, building 500, looking northeast, undated - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
38. Cafeteria, Dwing, building 500, looking northeast from southwest corner ...
38. Cafeteria, D-wing, building 500, looking northeast from southwest corner - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
64. SAC command post lobby, building 500, November 8, 1956, ...
64. SAC command post lobby, building 500, November 8, 1956, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
26. Inbound gates to building 500, looking east from Minuteman ...
26. Inbound gates to building 500, looking east from Minuteman Circle - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
62. Aerial view of SAC command post, building 500, looking ...
62. Aerial view of SAC command post, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
2. Front (west) elevation of building 500 looking southeast from ...
2. Front (west) elevation of building 500 looking southeast from SAC Boulevard - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
3. Threequarter view of building 500 looking southeast from SAC ...
3. Three-quarter view of building 500 looking southeast from SAC Boulevard - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
1. Front (west) elevation of building 500 looking east from ...
1. Front (west) elevation of building 500 looking east from SAC Boulevard - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
5. SOUTH ELEVATION OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL ...
5. SOUTH ELEVATION OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL BUILDING). - Loring Air Force Base, Alert Area, Southeastern portion of base, east of southern end of runway, Limestone, Aroostook County, ME
OVERALL view OF CONTROL BUILDING AND SECURITY GATE. view TO ...
OVERALL view OF CONTROL BUILDING AND SECURITY GATE. view TO EAST. - Plattsburgh Air Force Base, Security Police Entry Control Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
6. SOUTHWEST CORNER OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL ...
6. SOUTHWEST CORNER OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL BUILDING). - Loring Air Force Base, Alert Area, Southeastern portion of base, east of southern end of runway, Limestone, Aroostook County, ME
7. SOUTHEAST CORNER OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL ...
7. SOUTHEAST CORNER OF BUILDING 8965 (SECURITY POLICE ENTRY CONTROL BUILDING). - Loring Air Force Base, Alert Area, Southeastern portion of base, east of southern end of runway, Limestone, Aroostook County, ME
OVERALL VIEW OF CONTROL BUILDING AND SECURITY GATE. VIEW TO ...
OVERALL VIEW OF CONTROL BUILDING AND SECURITY GATE. VIEW TO NORTH. - Plattsburgh Air Force Base, Security Police Entry Control Building, Off Perimeter Road in SAC Alert Area, Plattsburgh, Clinton County, NY
14. ENGINE TEST CELL BUILDING ROOF. VENTILATION AND COOLING TOWERS. ...
14. ENGINE TEST CELL BUILDING ROOF. VENTILATION AND COOLING TOWERS. LOOKING EAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
10. ENGINE TEST CELL BUILDING INTERIOR. CELL 4, MOUNTING STAND. ...
10. ENGINE TEST CELL BUILDING INTERIOR. CELL 4, MOUNTING STAND. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE ...
SAC ALERT AREA AND FLIGHT LINE BUILDINGS, LOOKING TOWARD RESERVE FIRE TEAM FACILITY (BUILDING 3001) (CENTER). VIEW TO SOUTHEAST. - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
EAST (SIDE) AND NORTH (REAR) ELEVATIONS OF BUILDING. VIEW TO ...
EAST (SIDE) AND NORTH (REAR) ELEVATIONS OF BUILDING. VIEW TO SOUTHWEST. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
NORTH (REAR) AND EAST (SIDE) ELEVATIONS OF BUILDING. VIEW TO ...
NORTH (REAR) AND EAST (SIDE) ELEVATIONS OF BUILDING. VIEW TO SOUTH. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
SOUTH (FRONT) AND WEST (SIDE) ELEVATIONS OF BUILDING. VIEW TO ...
SOUTH (FRONT) AND WEST (SIDE) ELEVATIONS OF BUILDING. VIEW TO NORTH. - Plattsburgh Air Force Base, Munitions Maintenance Administration Building, Off Perimeter Road in Weapons Storage Area, Plattsburgh, Clinton County, NY
Exterior, looking west, Equipment Building to left, Tower at center, ...
Exterior, looking west, Equipment Building to left, Tower at center, Civil Engineering Storage Building (Building 5765) at left - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Microwave Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA
26. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
26. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER - MWOC IN OPERATION AT 1945 ZULU TIME, 26 OCTOBER, 1999. "SPACE TRACK BOARD" DATA SHOWING ITEMS #16609 MIR (RUSSIA) AND #25544 ISS (INTERNATIONAL SPACE STATION) BEING TRACKED. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
63. CONTEXT VIEW LOOKING WEST OF BUILDING 372 (HAZARDOUS STORAGE) ...
63. CONTEXT VIEW LOOKING WEST OF BUILDING 372 (HAZARDOUS STORAGE) IN BASE SPARES AREA WITH BUILDING 370 (ADMINISTRATIVE OFFICE BUILDING) IN BACKGROUND. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
Coupled vibrations of rectangular buildings subjected to normally-incident random wind loads
Safak, E.; Foutch, D.A.
1987-01-01
A method for analyzing the three-directional coupled dynamic response of wind-excited buildings is presented. The method is based on a random vibration concept and is parallel to those currently used for analyzing alongwind response. Only the buildings with rectangular cross-section and normally-incident wind are considered. The alongwind pressures and their correlations are represented by the well-known expressions that are available in the literature. The acrosswind forces are assumed to be mainly due to vortex shedding. The torque acting on the building is taken as the sum of the torque due to random alongwind forces plus the torque due to asymmetric acrosswind forces. The study shows the following: (1) amplitude of acrosswind vibrations can be several times greater than that of alongwind vibrations; (2) torsional vibrations are significant if the building has large frontal width, and/or it is asymmetric, and/or its torsional natural frequency is low; (3) even a perfectly symmetric structure with normally incident wind can experience significant torsional vibrations due to the randomness of wind pressures. ?? 1987.
DOE Office of Scientific and Technical Information (OSTI.GOV)
VANNONI, MICHAEL G.; BIRINGER, KENT L.; TROST, LAWRENCE C.
Missiles are attractive weapon systems because of their flexibility, survivability, and relatively low cost. Consequently, many nations are seeking to build missile forces resulting in regional arms races. Missile forces can be both stabilizing (e.g., providing a survivable force for deterrence) and destabilizing (e.g., creating strategic asymmetries). Efforts to control missile proliferation must account for these effects. A number of strategies to control the destabilizing effects of missiles were developed during the Cold War. Some of these strategies are applicable to regional missile control but new approaches, tailored to regional geographic and security conditions, are needed. Regional missile nonproliferation canmore » be pursued in a variety of ways: Reducing the demand for missiles by decreasing the perception of national threats; Restricting the export of missiles and associated equipment by supplier countries; Restricting information describing missile technology; Limiting missile development activities such as flight or engine tests; Restricting the operational deployment of existing missile forces; and Reducing existing missile forces by number and/or type. Even when development is complete, limits on deployment within range of potential targets or limits on operational readiness can help stabilize potential missile confrontations. Implementing these strategies often involves the collection and exchange of information about activities related to missile development or deployment. Monitoring is the process of collecting information used to for subsequent verification of commitments. A systematic approach to implementing verification is presented that identifies areas where monitoring could support missile nonproliferation agreements. The paper presents both non-technical and technical techniques for monitoring. Examples of non-technical techniques are declarations about planned test launches or on-site inspections. Examples of technical monitoring include remote monitoring (i.e., a sensor that is physically present at a facility) and remote sensing (i.e., a sensor that records activity without being physically present at a facility).« less
Experimental Study on Tsunami Risk Reduction on Coastal Building Fronted by Sea Wall
Khan, M. T. R.; Shirazi, S. M.
2014-01-01
This experimental study was conducted to idealize the efficacy of sea wall in controlling the tsunami forces on onshore structures. Different types of sea walls were placed in front of the building model. The tsunami forces and the wave heights were measured with and without the sea wall conditions. Types of sea wall, wall height, and wall positions were varied simultaneously to quantify the force reductions. Maximum of 41% forces was reduced by higher sea wall, positioned closer proximity to the model whereas this reduction was about 27% when the wall height was half of the high wall. Experimental investigations revealed that wall with adequate height and placed closer to the structures enables a satisfactory predictor of the force reduction on onshore structures. Another set of tests were performed with perforated wall placing near the building model. Less construction cost makes the provision of perforated sea wall interesting. The overall results showed that the efficacy of perforated wall is almost similar to solid wall. Hence, it can be efficiently used instead of solid wall. Moreover, overtopped water that is stuck behind the wall is readily gone back to the sea through perforations releasing additional forces on the nearby structures. PMID:24790578
50. Representative office, room 2024, second floor, Dwing, building 500, ...
50. Representative office, room 2024, second floor, D-wing, building 500, looking west - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
55. Room BF9, paper shredding facility, basement level, building 500, ...
55. Room BF-9, paper shredding facility, basement level, building 500, looking east - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
57. Entry door (open), BE16, basement level, building 500, looking ...
57. Entry door (open), BE-16, basement level, building 500, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
49. SAC Chief of Staff office, second floor, Awing, building ...
49. SAC Chief of Staff office, second floor, A-wing, building 500, looking northwest - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
36. Waiting area at main entry to building 500, Awing, ...
36. Waiting area at main entry to building 500, A-wing, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
46. SAC Commander in Chief entry, second floor, Awing, building ...
46. SAC Commander in Chief entry, second floor, A-wing, building 500, looking north - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
60. SAC emblem on side of missile, front lawn, building ...
60. SAC emblem on side of missile, front lawn, building 500, looking west - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
54. Room BF14, IDA room, basement level, building 500, looking ...
54. Room BF-14, IDA room, basement level, building 500, looking west - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
44. Dwing hallway, building 500, looking east from entry to ...
44. D-wing hallway, building 500, looking east from entry to SAC Control offices - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
56. Entry door (closed), BB16, basement level, building 500, looking ...
56. Entry door (closed), BB-16, basement level, building 500, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
47. SAC Commander in Chief office, second floor, Awing, building ...
47. SAC Commander in Chief office, second floor, A-wing, building 500, looking northwest - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
6. Threequarter view of Awing, building 500, from Minuteman Circle ...
6. Three-quarter view of A-wing, building 500, from Minuteman Circle looking northeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
68. Aerial view of SAC command post, building 500, looking ...
68. Aerial view of SAC command post, building 500, looking northeast, spring, 1957 - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
EAST (FRONT) AND NORTH (SIDE) ELEVATIONS OF BUILDING. view TO ...
EAST (FRONT) AND NORTH (SIDE) ELEVATIONS OF BUILDING. view TO SOUTHWEST. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
NORTH (SIDE) AND EAST (FRONT) ELEVATIONS OF BUILDING. view TO ...
NORTH (SIDE) AND EAST (FRONT) ELEVATIONS OF BUILDING. view TO SOUTH. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
WEST (REAR) AND NORTH (SIDE) ELEVATIONS OF BUILDING. VIEW TO ...
WEST (REAR) AND NORTH (SIDE) ELEVATIONS OF BUILDING. VIEW TO EAST. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
SOUTH (SIDE) AND WEST (REAR) ELEVATIONS OF BUILDING. view TO ...
SOUTH (SIDE) AND WEST (REAR) ELEVATIONS OF BUILDING. view TO NORTH. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
EAST (FRONT) AND SOUTH (SIDE) ELEVATIONS OF BUILDING. view TO ...
EAST (FRONT) AND SOUTH (SIDE) ELEVATIONS OF BUILDING. view TO WEST. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
8. ENGINE TEST CELL BUILDING INTERIOR. LONGITUDINAL CENTRAL PASSAGEWAY IN ...
8. ENGINE TEST CELL BUILDING INTERIOR. LONGITUDINAL CENTRAL PASSAGEWAY IN BASEMENT. LOOKING SOUTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN ...
5. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL ROOM ON MAIN FLOOR. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED ...
15. HISTORIC PHOTOGRAPH. ENGINE TEST CELL BUILDING FRONT FACADE DATED CA. 1975. LOOKING NORTH. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
4. FRONT FACADE OF ENGINE TEST CELL BUILDING. DETAIL OF ...
4. FRONT FACADE OF ENGINE TEST CELL BUILDING. DETAIL OF MAIN ENTRY. LOOKING NORTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON ...
6. ENGINE TEST CELL BUILDING INTERIOR. CENTRAL OFFICE AREA ON BASEMENT LEVEL. LOOKING WEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
3. FRONT FACADE OF ENGINE TEST CELL BUILDING. VIEW OF ...
3. FRONT FACADE OF ENGINE TEST CELL BUILDING. VIEW OF NORTHEAST WING. LOOKING WEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Vanquelef, Enguerran; Simon, Sabrina; Marquant, Gaelle; Garcia, Elodie; Klimerak, Geoffroy; Delepine, Jean Charles; Cieplak, Piotr; Dupradeau, François-Yves
2011-07-01
R.E.D. Server is a unique, open web service, designed to derive non-polarizable RESP and ESP charges and to build force field libraries for new molecules/molecular fragments. It provides to computational biologists the means to derive rigorously molecular electrostatic potential-based charges embedded in force field libraries that are ready to be used in force field development, charge validation and molecular dynamics simulations. R.E.D. Server interfaces quantum mechanics programs, the RESP program and the latest version of the R.E.D. tools. A two step approach has been developed. The first one consists of preparing P2N file(s) to rigorously define key elements such as atom names, topology and chemical equivalencing needed when building a force field library. Then, P2N files are used to derive RESP or ESP charges embedded in force field libraries in the Tripos mol2 format. In complex cases an entire set of force field libraries or force field topology database is generated. Other features developed in R.E.D. Server include help services, a demonstration, tutorials, frequently asked questions, Jmol-based tools useful to construct PDB input files and parse R.E.D. Server outputs as well as a graphical queuing system allowing any user to check the status of R.E.D. Server jobs.
2012-08-23
CAPE CANAVERAL, Fla. - In the Operations and Checkout Building at the Kennedy Space Center in Florida, NASA Administrator Charles Bolden, center, addresses news media in front of the Orion EFT-1 spacecraft. Also participating are Jules Schneider, senior manager of Project Engineering for the Lockheed Martin Orion Program at Kennedy, left, and Scott Wilson, NASA's manager of Production Operations for the Orion Program. Bolden took a few dozen members of the news media on a tour of the space agency's Kennedy Space Center and adjacent Cape Canaveral Air Force Station on Aug. 23, 2012 to show the progress being made for future government and commercial space endeavors that will begin from Florida's Space Coast. For more information, visit: http://www.nasa.gov/centers/kennedy/news/kennedy-bolden-tour.html Photo credit: NASA/Kim Shiflett
A Mechatronic Loading Device to Stimulate Bone Growth via a Human Knee.
Prabhala, Sai Krishna; Chien, Stanley; Yokota, Hiroki; Anwar, Sohel
2016-09-29
This paper presents the design of an innovative device that applies dynamic mechanical load to human knee joints. Dynamic loading is employed by applying cyclic and periodic force on a target area. The repeated force loading was considered to be an effective modality for repair and rehabilitation of long bones that are subject to ailments like fractures, osteoporosis, osteoarthritis, etc. The proposed device design builds on the knowledge gained in previous animal and mechanical studies. It employs a modified slider-crank linkage mechanism actuated by a brushless Direct Current (DC) motor and provides uniform and cyclic force. The functionality of the device was simulated in a software environment and the structural integrity was analyzed using a finite element method for the prototype construction. The device is controlled by a microcontroller that is programmed to provide the desired loading force at a predetermined frequency and for a specific duration. The device was successfully tested in various experiments for its usability and full functionality. The results reveal that the device works according to the requirements of force magnitude and operational frequency. This device is considered ready to be used for a clinical study to examine whether controlled knee-loading could be an effective regimen for treating the stated bone-related ailments.
A Mechatronic Loading Device to Stimulate Bone Growth via a Human Knee
Prabhala, Sai Krishna; Chien, Stanley; Yokota, Hiroki; Anwar, Sohel
2016-01-01
This paper presents the design of an innovative device that applies dynamic mechanical load to human knee joints. Dynamic loading is employed by applying cyclic and periodic force on a target area. The repeated force loading was considered to be an effective modality for repair and rehabilitation of long bones that are subject to ailments like fractures, osteoporosis, osteoarthritis, etc. The proposed device design builds on the knowledge gained in previous animal and mechanical studies. It employs a modified slider-crank linkage mechanism actuated by a brushless Direct Current (DC) motor and provides uniform and cyclic force. The functionality of the device was simulated in a software environment and the structural integrity was analyzed using a finite element method for the prototype construction. The device is controlled by a microcontroller that is programmed to provide the desired loading force at a predetermined frequency and for a specific duration. The device was successfully tested in various experiments for its usability and full functionality. The results reveal that the device works according to the requirements of force magnitude and operational frequency. This device is considered ready to be used for a clinical study to examine whether controlled knee-loading could be an effective regimen for treating the stated bone-related ailments. PMID:27690057
NASA Astrophysics Data System (ADS)
Langevin, Jared
Truly sustainable buildings serve to enrich the daily sensory experience of their human inhabitants while consuming the least amount of energy possible; yet, building occupants and their environmentally adaptive behaviors remain a poorly characterized variable in even the most "green" building design and operation approaches. This deficiency has been linked to gaps between predicted and actual energy use, as well as to eventual problems with occupant discomfort, productivity losses, and health issues. Going forward, better tools are needed for considering the human-building interaction as a key part of energy efficiency strategies that promote good Indoor Environmental Quality (IEQ) in buildings. This dissertation presents the development and implementation of a Human and Building Interaction Toolkit (HABIT), a framework for the integrated simulation of office occupants' thermally adaptive behaviors, IEQ, and building energy use as part of sustainable building design and operation. Development of HABIT begins with an effort to devise more reliable methods for predicting individual occupants' thermal comfort, considered the driving force behind the behaviors of focus for this project. A long-term field study of thermal comfort and behavior is then presented, and the data it generates are used to develop and validate an agent-based behavior simulation model. Key aspects of the agent-based behavior model are described, and its predictive abilities are shown to compare favorably to those of multiple other behavior modeling options. Finally, the agent-based behavior model is linked with whole building energy simulation in EnergyPlus, forming the full HABIT program. The program is used to evaluate the energy and IEQ impacts of several occupant behavior scenarios in the simulation of a case study office building for the Philadelphia climate. Results indicate that more efficient local heating/cooling options may be paired with wider set point ranges to yield up to 24/28% HVAC energy savings in the winter/summer while also reducing thermal unacceptability; however, it is shown that the source of energy being saved must be considered in each case, as local heating options end up replacing cheaper, more carbon-friendly gas heating with expensive, emissions-heavy plug load electricity. The dissertation concludes with a summary of key outcomes and suggests how HABIT may be further developed in the future.
USAF Academy Center for Space Situational Awareness
NASA Astrophysics Data System (ADS)
Dearborn, M.; Chun, F.; Liu, J.; Tippets, R.
2011-09-01
Since the days of Sputnik, the Air Force has maintained the surveillance of space and a position catalog of objects that can be tracked by primarily ground-based radars and optical systems. Recent events in space such as the test of the Chinese anti-satellite weapon in 2007 and the collision between an Iridium and Russian Cosmo satellite have demonstrated the great need to have a more comprehensive awareness of the situation in space. Hence space situational awareness (SSA) has become an increasingly important mission to the Air Force and to the security of the United States. To help meet the need for future leaders knowledgeable about SSA, the Air Force Academy formally stood up the Center for Space Situational Awareness (CSSAR). The goal of the CSSAR is to provide a unique combination of educational operational experience as well as a world-class research capability for hands-on education in SSA. In order to meet this goal, the CSSAR is implementing an array of sensors, operations center, and associated software, and analysis tools. For example we have radar receivers for bi-static returns from the VHF space fence, a network of small aperture telescopes, AFSPC astro standards software, and Joint Mission System software. This paper focuses on the observational capabilities of our telescopes. In general, the preferable method for characterizing a satellite is to obtain a high-resolution image. However, high-resolution images from groundbased telescopes are only achievable if the satellite is large and close in range. Thus small satellites in low-earth orbits and large satellites in geosynchronous orbits are essentially unresolved in the focal plane of a ground-based telescope. Building ever larger telescopes capable of tracking fast enough for satellites at high resolution requires tremendous resources and funding. Cost is one of the reasons we decided to develop a network of small, commercially available telescopes spatially diverse and networked together. We call this the Falcon Telescope Network (FTN) and it provides the Air Force Academy, Air Force and Department of Defense with a unique capability that is essentially non-existent in today’s research and operational environment. With the FTN we will have the eventual capability to conduct simultaneous observations of satellites for non-resolved space object identification (NRSOI). We present preliminary photometric and spectroscopic observations from LEO to GEO satellites. The Air Force Academy has a unique mission to educate future leaders in the science, technology, and operations in missions critical to the Air Force and the CSSAR is stepping up to meet these requirements for the SSA mission.
2005-11-18
2005, p. 23; Edward Cody, “China Builds A Smaller, Stronger Military,” Washington Post, April 12, 2005, p. 1; Bryan Bender, “China Bolsters Its Forces...testimony, p. 1; 2003 CFR task force report, pp. 24-25, 31-32, 62-63; Edward Cody, “China Builds A Smaller, Stronger Military,” April 12, 2005, p. 1; David...encircle” China, the report said. See also Edward Cody, “China Builds A Smaller, Stronger Military,” Washington Post, April 12, 2005, p. 1. 84 For
2011-09-08
CAPE CANAVERAL, Fla. -- On Cape Canaveral Air Force Station in Florida, United Launch Alliance (ULA) personnel in the Delta Operations Building prepare for the launch of NASA's Gravity Recovery and Interior Laboratory mission aboard a ULA Delta II Heavy rocket. Physical control of the rocket is maintained from the building, located about a mile from Space Launch Complex 17B. The room functions as a "soft blockhouse" and is the room from which the computer-generated command to launch the rocket is issued two seconds before liftoff. Launch is scheduled for 8:37:06 a.m. EDT Sept. 8. GRAIL will fly twin spacecraft in tandem around the moon to precisely measure and map variations in the moon's gravitational field. The mission will provide the most accurate global gravity field to date for any planet, including Earth. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Kim Shiflett
2011-09-08
CAPE CANAVERAL, Fla. -- On Cape Canaveral Air Force Station in Florida, United Launch Alliance (ULA) personnel in the Delta Operations Building prepare for the launch of NASA's Gravity Recovery and Interior Laboratory mission aboard a ULA Delta II Heavy rocket. Physical control of the rocket is maintained from the building, located about a mile from Space Launch Complex 17B. The room functions as a "soft blockhouse" and is the room from which the computer-generated command to launch the rocket is issued two seconds before liftoff. Launch is scheduled for 8:37:06 a.m. EDT Sept. 8. GRAIL will fly twin spacecraft in tandem around the moon to precisely measure and map variations in the moon's gravitational field. The mission will provide the most accurate global gravity field to date for any planet, including Earth. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Kim Shiflett
2011-09-08
CAPE CANAVERAL, Fla. -- On Cape Canaveral Air Force Station in Florida, United Launch Alliance (ULA) personnel in the Delta Operations Building prepare for the launch of NASA's Gravity Recovery and Interior Laboratory mission aboard a ULA Delta II Heavy rocket. Physical control of the rocket is maintained from the building, located about a mile from Space Launch Complex 17B. The room functions as a "soft blockhouse" and is the room from which the computer-generated command to launch the rocket is issued two seconds before liftoff. Launch is scheduled for 8:37:06 a.m. EDT Sept. 8. GRAIL will fly twin spacecraft in tandem around the moon to precisely measure and map variations in the moon's gravitational field. The mission will provide the most accurate global gravity field to date for any planet, including Earth. For more information, visit http://www.nasa.gov/grail. Photo credit: NASA/Kim Shiflett
1. STATION "50" AREA OVERVIEW, BUILDING 0512 AT FAR LEFT, ...
1. STATION "50" AREA OVERVIEW, BUILDING 0512 AT FAR LEFT, AND PADS FOR SHOP AND STORAGE BUILDINGS IN CENTER. Looking northeast. - Edwards Air Force Base, South Base Sled Track, Instrumentation & Control Building, South of Sled Track, Station "50" area, Lancaster, Los Angeles County, CA
6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING ...
6. VIEW OF BUILDING 371 EXTERIOR WALL CONSTRUCTION DETAIL. BUILDING CONSTRUCTION WAS HARDENED TO WITHSTAND THE FORCES IMPOSED BY A DESIGN-BASIS EARTHQUAKE OR TORNADO. (7/1/74) - Rocky Flats Plant, Plutonium Recovery Facility, Northwest portion of Rocky Flats Plant, Golden, Jefferson County, CO
NASA Astrophysics Data System (ADS)
Quagliarini, Enrico; Bernardini, Gabriele; D'Orazio, Marco
2017-07-01
Understanding and representing how individuals behave in earthquake emergencies would be essentially to assess the impact of vulnerability reduction strategies on existing buildings in seismic areas. In fact, interactions between individuals and the scenario (modified by the earthquake occurrence) are really important in order to understand the possible additional risks for people, especially during the evacuation phase. The current approach is based on "qualitative" aspects, in order to define best practice guidelines for Civil Protection and populations. On the contrary, a "quantitative" description of human response and evacuation motion in similar conditions is urgently needed. Hence, this work defines the rules for pedestrians' earthquake evacuation in urban scenarios, by taking advantages of previous results of real-world evacuation analyses. In particular, motion laws for pedestrians is defined by modifying the Social Force model equation. The proposed model could be used for evaluating individuals' evacuation process and so for defining operative strategies for interferences reduction in critical urban fabric parts (e.g.: interventions on particular buildings, evacuation strategies definition, city parts projects).
2010-08-26
CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a tractor-trailer carrying the Alpha Magnetic Spectrometer, or AMS, passes the Vehicle Assembly Building en route to the Space Station Processing Facility. The state-of-the-art particle physics detector arrived on Kennedy's Shuttle Landing Facility aboard an Air Force C-5M aircraft from Europe. It will operate as an external module on the International Space Station to study the universe and its origin by searching for dark matter. AMS will fly to the station aboard space shuttle Endeavour's STS-134 mission targeted to launch Feb. 26, 2011. Photo credit: NASA/Frankie Martin
Project CHECO Southeast Asia Report. Control of Air Strikes in SEA 1961-1966
1967-03-01
such use. By the end of December there were 30 F-lOO’s at Da Nang, ten B-57’s at 66/ Bien Hoa, and eighteen F-105’s at Korat .-- One notable...Phanom, Ubon, I Korat , and Phitsanulok with a CRC at Don Muangc There were, in effect, I three control systems operating for airpower in Southeast...much more 21/ efficiently. Strike forces in Thailand were building up. Four squadrons ofF-lOS’s, two each at Takhli and Korat , were in Thailand by
Credit PSR. This image depicts the southwest and southeast facades ...
Credit PSR. This image depicts the southwest and southeast facades as seen when looking north. The concrete block lean-to in the foreground is the facility control room. Between this room and the X-ray room is a four foot thick concrete wall (which can be seen as a "step" between the lowest and highest roof planes) intended as X-ray shielding for operators. The X-ray chamber faces away from the JPL Edwards Facility toward a fenced desert area - Jet Propulsion Laboratory Edwards Facility, Radiographic Inspection Building, Edwards Air Force Base, Boron, Kern County, CA
1. Credit WCT. Original 2 1/4" x 2 1/4" color ...
1. Credit WCT. Original 2- 1/4" x 2- 1/4" color negative is housed in the JPL Photography Laboratory, Pasadena, California. Photo shows John Morrow in charge of milling operations on coupons ("dogbones") of propellant on an Index milling machine. Coupons were milled to precise dimensions for tensile tests. Note that two sprinkler heads have been placed in very close proximity to the milling table for fire suppression purposes (JPL negative no. JPL-10283AC, 27 January 1989) - Jet Propulsion Laboratory Edwards Facility, Preparation Building, Edwards Air Force Base, Boron, Kern County, CA
2008-08-21
CAPE CANAVERAL, Fla. – The large windows of a building at NASA's Kennedy Space Center are covered by plywood and sandbags to protect against the wind and rain driven by Tropical Storm Fay. The storm passed over the center Aug. 20 and then stalled offshore, bringing with it heavy rain and tropical storm force wind. Kennedy closed Aug. 19 because of Fay and reopened for normal operations Aug. 22. Based on initial assessments, there was no damage to space flight hardware, such as the space shuttles and Hubble Space Telescope equipment. Some facilities did sustain minor damage. Photo credit: NASA/Jack Pfaller
2005-06-01
AIR FORCE RESEARCH LABORATORY SPACE VEHICLES INTEGRATED EXPERMENTS DIVISION OFFICE SPACE AT KIRTLAND AIR FORCE ... Kirtland Air Force Base (KAFB). The office building would house the Air Force Research Laboratory Space Vehicles Integrated Experiments Division...ADDRESS(ES) Air Force Research Laboratory ,Space Vehicles Directorate,3550 Aberdeen Ave. SE, Kirtland
4. AERIAL VIEW FROM THE SOUTH OF (LEFT TO RIGHT ...
4. AERIAL VIEW FROM THE SOUTH OF (LEFT TO RIGHT CENTER) LOB (BLDG. 763), TECHNICAL SUPPORT BUILDING (BLDG. 762/762A), AND SLC-3 AIR FORCE BUILDING (BLDG. 761). SOUTH SIDE OF SLC-3 WEST IN LEFT BACKGROUND. OCEAN IN DISTANT BACKGROUND. - Vandenberg Air Force Base, Space Launch Complex 3, Napa & Alden Roads, Lompoc, Santa Barbara County, CA
Is There Space for the Objective Force?
2003-04-07
force through the combination of precision weapons and knowledge-based warfare. Army forces will survive through information dominance , provided by a...Objective Forces. Space-based systems will be foundational building blocks for the Objective Force to achieve information dominance and satellite...communications required for information dominance across a distributed battlefield? Second, what exists to provide the Objective Force information
Credit PSR. View looks east southeast (118°) across foundations of ...
Credit PSR. View looks east southeast (118°) across foundations of North Base Administration Building (originally numbered T-50) toward Building 4318 (Warehouse) and Building 4305 (Unicon Portable Hangar). Building 4401 (Hangar No. 1) appears in extreme left background - Edwards Air Force Base, North Base, Administration Building T-50, D Street, Boron, Kern County, CA
10. Threequarter view of southwest corner of building 500 and ...
10. Three-quarter view of southwest corner of building 500 and G-wing, looking northeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
27. Threequarter view of building 500, and Awing, looking southeast ...
27. Three-quarter view of building 500, and A-wing, looking southeast from Minuteman Circle - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
4. View of drainage ditch and front walkway to building ...
4. View of drainage ditch and front walkway to building 500 looking east from SAC Boulevard - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
DETAIL OF MAIN ENTRANCE ON EAST (FRONT) ELEVATION OF BUILDING. ...
DETAIL OF MAIN ENTRANCE ON EAST (FRONT) ELEVATION OF BUILDING. view TO SOUTHWEST. - Plattsburgh Air Force Base, Target Intelligence Training Building-Combat Center, Off Connecticut Road, east of Idaho Avenue, Plattsburgh, Clinton County, NY
4. Exterior view of Systems Integration Laboratory Building (T28), looking ...
4. Exterior view of Systems Integration Laboratory Building (T-28), looking northwest. - Air Force Plant PJKS, Systems Integration Laboratory, Systems Integration Laboratory Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
3. Exterior view of Systems Integration Laboratory Building (T28), looking ...
3. Exterior view of Systems Integration Laboratory Building (T-28), looking southeast. - Air Force Plant PJKS, Systems Integration Laboratory, Systems Integration Laboratory Building, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
68. INTERIOR SHOT OF ENTRANCE TO BUILDING 272 (PLUTONIUM STORAGE ...
68. INTERIOR SHOT OF ENTRANCE TO BUILDING 272 (PLUTONIUM STORAGE BUILDING) LOOKING WEST. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS ...
11. ENGINE TEST CELL BUILDING INTERIOR. CONTROL ROOM FOR CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS ...
13. ENGINE TEST CELL BUILDING INTERIOR. EQUIPMENT ROOM SERVING CELLS 2 AND 4. LOOKING SOUTHEAST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
7. ENGINE TEST CELL BUILDING INTERIOR. WALL MAP IN CENTRAL ...
7. ENGINE TEST CELL BUILDING INTERIOR. WALL MAP IN CENTRAL BASEMENT OFFICE AREA. LOOKING SOUTHWEST. - Fairchild Air Force Base, Engine Test Cell Building, Near intersection of Arnold Street & George Avenue, Spokane, Spokane County, WA
Credit BG. View looking northeast (42°) at storage building used ...
Credit BG. View looking northeast (42°) at storage building used to store equipment near southeast edge of aircraft apron in the vicinity of Building 4305 (Unicon Portable Hangar) - Edwards Air Force Base, North Base, Equipment Storage Building, East of Second Street, Boron, Kern County, CA
Contextual view to north showing left to right, building 908, ...
Contextual view to north showing left to right, building 908, 912 (building 909 out of view behind building 912), 902 (left center), 903 (right center), 904 (dark brick), 905, 906, 90mm. - Travis Air Force Base, North of California State Highway 12, Fairfield, Solano County, CA
24. SITE BUILDING 002 SCANNER BUILDING OPERATIONS CENTER ...
24. SITE BUILDING 002 - SCANNER BUILDING - OPERATIONS CENTER -- MWOC IN OPEARATION AT 1924 ZULU TIME. 26 OCTOBER, 1999. - Cape Cod Air Station, Technical Facility-Scanner Building & Power Plant, Massachusetts Military Reservation, Sandwich, Barnstable County, MA
Air Force Special Operations Command > Home > POTFF
Air Force Special Operations Command Air Force Special Operations Command Join the Air Force Home Sheets AFSOC Senior Leaders AFSOC Heritage Units 1st Special Operations Wing 24th Special Operations Wing 27th Special Operations Wing 352nd Special Operations Wing 353rd Special Operations Group 492nd Special
Indoor imagery with a 3D through-wall synthetic aperture radar
NASA Astrophysics Data System (ADS)
Sévigny, Pascale; DiFilippo, David J.; Laneve, Tony; Fournier, Jonathan
2012-06-01
Through-wall radar imaging is an emerging technology with great interest to military and police forces operating in an urban environment. A through-wall imaging radar can potentially provide interior room layouts as well as detection and localization of targets of interest within a building. In this paper, we present our through-wall radar system mounted on the side of a vehicle and driven along a path in front of a building of interest. The vehicle is equipped with a LIDAR (Light Detection and Ranging) and motion sensors that provide auxiliary information. The radar uses an ultra wideband frequency-modulated continuous wave (FMCW) waveform to obtain high range resolution. Our system is composed of a vertical linear receive array to discriminate targets in elevation, and two transmit elements operated in a slow multiple-input multiple output (MIMO) configuration to increase the achievable elevation resolution. High resolution in the along-track direction is obtained through synthetic aperture radar (SAR) techniques. We present experimental results that demonstrate the 3-D capability of the radar. We further demonstrate target detection behind challenging walls, and imagery of internal wall features. Finally, we discuss future work.
Emergent mechanics of biological structures
Dumont, Sophie; Prakash, Manu
2014-01-01
Mechanical force organizes life at all scales, from molecules to cells and tissues. Although we have made remarkable progress unraveling the mechanics of life's individual building blocks, our understanding of how they give rise to the mechanics of larger-scale biological structures is still poor. Unlike the engineered macroscopic structures that we commonly build, biological structures are dynamic and self-organize: they sculpt themselves and change their own architecture, and they have structural building blocks that generate force and constantly come on and off. A description of such structures defies current traditional mechanical frameworks. It requires approaches that account for active force-generating parts and for the formation of spatial and temporal patterns utilizing a diverse array of building blocks. In this Perspective, we term this framework “emergent mechanics.” Through examples at molecular, cellular, and tissue scales, we highlight challenges and opportunities in quantitatively understanding the emergent mechanics of biological structures and the need for new conceptual frameworks and experimental tools on the way ahead. PMID:25368421
2011-07-21
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, the interstage of the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite into space is lifted up the side of NASA's Space Launch Complex-2. The interstage provides an interface between the launch vehicle's first and second stages. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Rudy Bledsoe
2011-07-28
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, technicians monitor the progress as a solid rocket motor is attached to a United Launch Alliance Delta II rocket at NASA’s Space Launch Complex-2. The Delta II will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Dan Liberotti
2011-07-21
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, the interstage of the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite into space is lifted up the side of NASA's Space Launch Complex-2. The interstage provides an interface between the launch vehicle's first and second stages. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Rudy Bledsoe
2011-07-21
VANDENBERG AIR FORCE BASE, Calif. -- At NASA's Space Launch Complex-2 on Vandenberg Air Force Base in California, spacecraft technicians prepare to attach the interstage of the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite into space to a lifting device. The interstage provides an interface between the launch vehicle's first and second stages. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Rudy Bledsoe
2011-07-21
VANDENBERG AIR FORCE BASE, Calif. -- At Vandenberg Air Force Base in California, preparations are under way to lift the interstage of the United Launch Alliance Delta II that will carry NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite into space at NASA's Space Launch Complex-2. The interstage provides an interface between the launch vehicle's first and second stages. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS) to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB, Rudy Bledsoe
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians remove the lifting crane and harnesses from the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, Ball Aerospace technicians rotate NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) into the vertical position during a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians monitor the progress as a crane begins to lift the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors dev eloped for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-01
VANDENBERG AIR FORCE BASE, Calif. – NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) is positioned on a test platform in a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians attach a crane to the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, Ball Aerospace technicians rotate NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) into the vertical position during a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, Ball Aerospace technicians position NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) for a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) is positioned on a test platform in a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, awaiting a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, Ball Aerospace technicians rotate NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) into the vertical position during a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-01
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians position NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) for test and checkout. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-01
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians position NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) for test and checkout. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. -- The environmentally controlled transportation container holding NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite arrives outside the Astrotech payload processing facility on Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: USAF 30th Space Communications Squadron/Doug Gruben, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians prepare to attach a crane to the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians monitor the progress as a crane begins to lift the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-09-08
VANDENBERG AIR FORCE BASE, Calif. – In a clean room inside the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, Ball Aerospace technicians position NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) for a solar array frangible bolt pre-load verification test. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. -- The environmentally controlled transportation container holding NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite comes to rest on the floor of the Astrotech payload processing facility on Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/Jerry Nagy, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – Transported by truck, the environmentally controlled transportation container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) arrives at the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – Transported by truck, the environmentally controlled transportation container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) arrives at the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. -- The environmentally controlled transportation container holding NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite is delivered into the Astrotech payload processing facility on Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: USAF 30th Space Communications Squadron/Doug Gruben, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. -- The environmentally controlled transportation container holding NASA's National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) satellite is lifted from its delivery truck at the Astrotech payload processing facility on Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/Jerry Nagy, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – The Astrotech Payload Processing Facility at Vandenberg Air Force Base in California awaits delivery of the environmentally controlled transportation container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – Transported by truck, the environmentally controlled transportation container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) arrives at the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – Transported by truck, the environmentally controlled transportation container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) arrives at the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- Vernon Thorp, program manager, NASA missions, United Launch Alliance, Cape Canaveral, Fla., participates in the prelaunch news conference at Vandenberg Air Force Base, Calif., for NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
2011-08-30
VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech Payload Processing Facility at Vandenberg Air Force Base in California, technicians monitor the progress as a crane begins to lift the container holding NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP). NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA’s Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 25 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/30th Communications Squadron, VAFB
2011-10-26
VANDENBERG AIR FORCE BASE, Calif. -- A model of the NASA’s National Polar-orbiting Operational Environmental Satellite System Preparatory Project (NPP) spacecraft and the United Launch Alliance Delta II rocket are displayed during the prelaunch news conference at Vandenberg Air Force Base, Calif. NPP represents a critical first step in building the next-generation of Earth-observing satellites. NPP will carry the first of the new sensors developed for this satellite fleet, now known as the Joint Polar Satellite System (JPSS), to be launched in 2016. NPP is the bridge between NASA's Earth Observing System (EOS) satellites and the forthcoming series of JPSS satellites. The mission will test key technologies and instruments for the JPSS missions. NPP is targeted to launch Oct. 28 from Space Launch Complex-2 aboard a United Launch Alliance Delta II rocket. For more information, visit http://www.nasa.gov/NPP. Photo credit: NASA/VAFB
NASA Astrophysics Data System (ADS)
Korkmaz, K. A.
2009-06-01
Pakistan and neighbourhood experience numerous earthquakes, most of which result in damaged or collapsed buildings and loss of life that also affect the economy adversely. On 29 October, 2008, an earthquake of magnitude 6.5 occurred in Ziarat, Quetta Region, Pakistan which was followed by more than 400 aftershocks. Many villages were completely destroyed and more than 200 people died. The previous major earthquake was in 2005, known as the South Asian earthquake (Mw=7.6) occurred in Kashmir, where 80 000 people died. Inadequate building stock is to be blamed for the degree of disaster, as the majority of the buildings in the region are unreinforced masonry low-rise buildings. In this study, seismic vulnerability of regionally common unreinforced masonry low-rise buildings was investigated using probabilistic based seismic safety assessment. The results of the study showed that unreinforced masonry low-rise buildings display higher displacements and shear force. Probability of damage due to higher displacements and shear forces can be directly related to damage or collapse.
6. INTERIOR, ORIGINAL BLOCKHOUSE SECTION OF BUILDING 0512, NORTH WALL ...
6. INTERIOR, ORIGINAL BLOCKHOUSE SECTION OF BUILDING 0512, NORTH WALL FACING TEST TRACK. - Edwards Air Force Base, South Base Sled Track, Instrumentation & Control Building, South of Sled Track, Station "50" area, Lancaster, Los Angeles County, CA
1. OBLIQUE VIEW OF THE COMPLEX OF BUILDINGS INCLUDING THE ...
1. OBLIQUE VIEW OF THE COMPLEX OF BUILDINGS INCLUDING THE MESS HALL BUILDING 220 IN THE FOREGROUND, LOOKING NORTH-NORTHEAST. - Mill Valley Air Force Station, Mess Hall, East Ridgecrest Boulevard, Mount Tamalpais, Mill Valley, Marin County, CA
FLIGHT LINE, LOOKING TOWARD FLIGHT LINE FIRE STATION (BUILDING 2748)CENTER ...
FLIGHT LINE, LOOKING TOWARD FLIGHT LINE FIRE STATION (BUILDING 2748)CENTER AND AIRCRAFT MAINTENANCE DOCKS (BUILDINGS 2741 AND 2766)LEFT. VIEW TO NORTH - Plattsburgh Air Force Base, U.S. Route 9, Plattsburgh, Clinton County, NY
46. SOUTHEAST SIDE ELEVATION OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ...
46. SOUTHEAST SIDE ELEVATION OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
47. EAST CORNER OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION ...
47. EAST CORNER OF BUILDING 361 (MUNITIONS MAINTENANCE SQUADRON ADMINISTRATION BUILDING) IN BASE SPARES AREA. - Loring Air Force Base, Weapons Storage Area, Northeastern corner of base at northern end of Maine Road, Limestone, Aroostook County, ME
45. SAC conference room 2A8, second floor, Dwing, building 500, ...
45. SAC conference room 2A8, second floor, D-wing, building 500, looking southeast - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE
11. Threequarter view of southwest corner of building 500 and ...
11. Three-quarter view of southwest corner of building 500 and G-wing, looking northeast, from Apollo Drive - Offutt Air Force Base, Strategic Air Command Headquarters & Command Center, Headquarters Building, 901 SAC Boulevard, Bellevue, Sarpy County, NE