  1. Annual Report: Photovoltaic Subcontract Program FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Summers, K. A.

    1991-03-01

    This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less

  2. Solar electric thermal hydronic (SETH) product development project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, B.L.; Sindelar, A.

    Positive Energy, Inc. received a second Technology Maturation and Commercialization Project Subcontract during the 1999 round of awards. This Subcontract is for the purpose of further aiding Positive Energy, Inc. in preparing its Solar Electric Thermal Hydronic (SETH) control and distribution package for market introduction. All items of this subcontracted project have been successfully completed. This Project Report contains a summary of the progress made during the SETH Development Project (the Project) over the duration of the 1999 Subcontract. It includes a description of the effort performed and the results obtained in the pursuit of intellectual property protection and developmentmore » of product documentation for the end users. This report also summarizes additional efforts taken by and for the SETH project outside of the Subcontract. It presents a chronology of activities over the duration of the Subcontract, and includes a few selected sample copies of documents offered as evidence of their success.« less

  3. SBA’s Progress in Implementing the Public Law 95-507 Subcontracting and Surety Bond Waiver Provisions has been Limited.

    DTIC Science & Technology

    1981-09-18

    IMP~mnl~~~U LayL 95-507 SubcontractjfQ fd Surety Bond Waiver Provisiolns 3as8en Limted. The Small Business Administration, working with a...Presidential Advisory Committee has no fll ipleetd the small business sub- L ~ 3 cowtractlgpoiin The committee has fo- cused on obtaining subcontracts from...GAO recommends changes SBA should make to nmimize subcontracting opportunities for small businesses . Also, GAO sugssthat the provision for 2 years

  4. 48 CFR 32.504 - Subcontracts under prime contracts providing progress payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contractor shall not delete the references to “Contracting Officer” and “Government” in adapting paragraph (g... “Contracting Officer” may be changed to “Contracting Officer or Prime Contractor.” (ii) The term “the Government” may be changed to “the Government or Prime Contractor.” (3) The subcontract special terms...

  5. Photovoltaic Subcontract Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surek, Thomas; Catalano, Anthony

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  6. Photovoltaic Subcontract Program. Annual report, FY 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-03-01

    This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less

  7. Upcoming Purchasing and Subcontracting Opportunities | NREL

    Science.gov Websites

    Services Fall 2022 Construction@nrel.gov Design-Build and Construction Spring 2018 Construction@nrel.gov Design-Build for Minor Construction Spring 2020 Construction@nrel.gov Testing of Fuel and Oil Samples

  8. The Grid Analysis and Display System (GrADS)

    NASA Technical Reports Server (NTRS)

    Kinter, James L., III

    1994-01-01

    During the period 1 September 1993 - 31 August 1994, further development of the Grid Analysis and Display System (GrADS) was conducted at the Center for Ocean-Land-Atmosphere Studies (COLA) of the Institute of Global Environment and Society, Inc. (IGES) under subcontract 5555-31 from the University Space Research Association (USRA) administered by The Center of Excellence in Space Data and Information Sciences (CESDIS). This final report documents progress made under this subcontract and provides directions on how to access the software and documentation developed therein. A short description of GrADS is provided followed by summary of progress completed and a summary of the distribution of the software to date and the establishment of research collaborations.

  9. Black liquor gasification phase 2D final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohl, A.L.; Stewart, A.E.

    1988-06-01

    This report covers work conducted by Rockwell International under Amendment 5 to Subcontract STR/DOE-12 of Cooperative Agreement DE-AC-05-80CS40341 between St. Regis Corporation (now Champion International) and the Department of Energy (DOE). The work has been designated Phase 2D of the overall program to differentiate it from prior work under the same subcontract. The overall program is aimed at demonstrating the feasibility of and providing design data for the Rockwell process for gasifying Kraft black liquor. In this process, concentrated black liquor is converted into low-Btu fuel gas and reduced melt by reaction with air in a specially designed gasification reactor.

  10. 48 CFR 919.7011 - Developmental assistance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Engineering and other technical assistance; (3) Noncompetitive award of subcontracts under DOE or other... activities; (5) Progress payments based on costs; (6) Rent-free use of facilities and/or equipment owned or...

  11. Develop and test fuel cell powered on-site integrated total energy system

    NASA Technical Reports Server (NTRS)

    Kaufman, A.; Feigenbaum, H.; Wang, C. L.; Werth, J.; Whelan, J. A.

    1983-01-01

    Test results are presented for a 24 cell, two sq ft (4kW) stack. This stack is a precursor to a 25kW stack that is a key milestone. Results are discussed in terms of cell performance, electrolyte management, thermal management, and reactant gas manifolding. The results obtained in preliminary testing of a 50kW methanol processing subsystem are discussed. Subcontracting activities involving application analysis for fuel cell on site integrated energy systems are updated.

  12. Reaching the Environmental Community: Designing an Information Program for the NREL Biofuels Program; May 2002-May 2003

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ames, J.; Werner, C.

    2003-08-01

    Final report on subcontract for holding two briefings for policymakers and the environmental community on environmental issues related to biofuels; one on one on the energy and environmental issues associated with biofuels production and use, and the other on implications of pending renewable fuels standard legislation.

  13. Lighting Studies for Fuelling Machine Deployed Visual Inspection Tool

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoots, Carl; Griffith, George

    2015-04-01

    Under subcontract to James Fisher Nuclear, Ltd., INL has been reviewing advanced vision systems for inspection of graphite in high radiation, high temperature, and high pressure environments. INL has performed calculations and proof-of-principle measurements of optics and lighting techniques to be considered for visual inspection of graphite fuel channels in AGR reactors in UK.

  14. Small Volume Fuel Testers Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schoegl, I.; McNenly, M. J.; Killingsworth, N. J.

    Micro-liter fuel ignition testing (μ-FIT) is based on the premise that characteristics FREI (Flames with Repetitive Extinction and Ignition, i.e. cyclically occurring combustion events within heated capillaries), are linked to fuel properties. In early FY16, proof-of-concept measurements with primary reference fuel (PRF) mixtures, i.e. blends of n-heptane and iso-octane, yielded clear evidence for the feasibility of the approach. Our experiments showed that it is critical to accurately link observed flame positions to local temperatures, which provides information on ignition, extinction and flame propagation, all of which are known to be impacted by fuel properties. In FY16, one major hurdle wasmore » uncertainty of temperature calibration, which required significant efforts for corrective action that were not included in the original scope of work. Temperature calibrations are obtained by translating a thermocouple within the capillary in absence of a flame. While measurements have good repeatability when accounting for transient and insertion effects, results from nominally identical thermocouples reveal unacceptable uncertainty (up to ±50K), which is attributed to variations in thermocouple placement and manufacturing tolerances. This issue is currently being resolved by switching to non-intrusive optical temperature measurements. Updates are expected to yield uncertainties of less than ±10K, while also eliminating transient and insertion effects. The experimental work was complemented by computational efforts where it was shown that a simplified Lagrangian zero-D model with detailed kinetics yields fuelspecific differentiation of ignition temperatures for simple fuels that are consistent with experiments. Further, a 2D transient model was implemented in OpenFOAM to investigate combustion behavior of simple fuels at elevated pressure. In an upcoming visit to LLNL, more advanced simulations using LLNL’s computational tools (e.g. zero-RK) are planned, which will yield additional numerical insights on FREI behavior of more realistic spark ignited (SI) engine fuel surrogates. As there is a lag between DOE FY16 and the time frame of the LSU subcontract, it is anticipated that deliverables outlined in the scope of work will be met by the end of the subcontract (January 2017).« less

  15. Solid Oxide Fuel Cells Operating on Alternative and Renewable Fuels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Xiaoxing; Quan, Wenying; Xiao, Jing

    2014-09-30

    This DOE project at the Pennsylvania State University (Penn State) initially involved Siemens Energy, Inc. to (1) develop new fuel processing approaches for using selected alternative and renewable fuels – anaerobic digester gas (ADG) and commercial diesel fuel (with 15 ppm sulfur) – in solid oxide fuel cell (SOFC) power generation systems; and (2) conduct integrated fuel processor – SOFC system tests to evaluate the performance of the fuel processors and overall systems. Siemens Energy Inc. was to provide SOFC system to Penn State for testing. The Siemens work was carried out at Siemens Energy Inc. in Pittsburgh, PA. Themore » unexpected restructuring in Siemens organization, however, led to the elimination of the Siemens Stationary Fuel Cell Division within the company. Unfortunately, this led to the Siemens subcontract with Penn State ending on September 23rd, 2010. SOFC system was never delivered to Penn State. With the assistance of NETL project manager, the Penn State team has since developed a collaborative research with Delphi as the new subcontractor and this work involved the testing of a stack of planar solid oxide fuel cells from Delphi.« less

  16. IOWA STATE MANPOWER DEVELOPMENT COUNCIL. TWELFTH PROGRESS REPORT, MARCH 1, APRIL 30, 1967.

    ERIC Educational Resources Information Center

    Office of Manpower Policy, Evaluation, and Research (DOL), Washington, DC.

    THE COUNCIL NEGOTIATED SEVERAL ON-THE-JOB TRAINING SUBCONTRACTS FOR PLACEMENTS, INITIATED 4 COUPLED ON-THE-JOB TRAINING-VOCATIONAL EDUCATION PROGRAMS, ACQUIRED ADDITIONAL FUNDS TO ENLARGE BOTH PROJECTS, AND WAS INVOLVED IN A CONTROVERSY OVER THE TRAINING OF BRICKLAYERS UNDER A MANPOWER DEVELOPMENT TRAINING ACT-APPROVED PROGRAM. REPRODUCTIONS OF…

  17. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  18. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  19. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  20. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  1. 48 CFR 19.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subsector as determined by the Department of Commerce for SDB concerns in negotiated acquisitions by... achievement as compared to proposed monetary targets for SDB subcontracting. The incentive subcontracting program is separate and distinct from the establishment, monitoring, and enforcement of SDB subcontracting...

  2. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND... notify the Contracting officer in writing at least 30 days in advance of entering into any subcontract or...

  3. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracts and work... Subcontracts and work coordination. The contracting officer shall insert the clause at 852.236-80, Subcontracts and work coordination, in solicitations and contracts for construction expected to exceed the micro...

  4. A National Coordinating Center for Trauma Research

    DTIC Science & Technology

    2016-10-01

    of ketamine during the first three days following injury has a sustained effect on reducing the incidence or severity of Post -Traumatic Stress... design , medical modeling, physical modeling, engineering and system integration. Progress Reported: The subcontract was fully executed on 05...were posted on the NTI website (www.nationaltraumainstitute.org). The goal is to comprehensively disseminate published works to the wider trauma

  5. Large-area triple-junction a-Si alloy production scaleup. Annual subcontract report, 17 March 1993--18 March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oswald, R.; Morris, J.

    1994-11-01

    The objective of this subcontract over its three-year duration is to advance Solarex`s photovoltaic manufacturing technologies, reduce its a-Si:H module production costs, increase module performance and expand the Solarex commercial production capacity. Solarex shall meet these objectives by improving the deposition and quality of the transparent front contact, by optimizing the laser patterning process, scaling-up the semiconductor deposition process, improving the back contact deposition, scaling-up and improving the encapsulation and testing of its a-Si:H modules. In the Phase 2 portion of this subcontract, Solarex focused on improving deposition of the front contact, investigating alternate feed stocks for the front contact,more » maximizing throughput and area utilization for all laser scribes, optimizing a-Si:H deposition equipment to achieve uniform deposition over large-areas, optimizing the triple-junction module fabrication process, evaluating the materials to deposit the rear contact, and optimizing the combination of isolation scribe and encapsulant to pass the wet high potential test. Progress is reported on the following: Front contact development; Laser scribe process development; Amorphous silicon based semiconductor deposition; Rear contact deposition process; Frit/bus/wire/frame; Materials handling; and Environmental test, yield and performance analysis.« less

  6. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  7. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (JUN 2005) (a) An offeror, other than a small business concern, submitting...

  8. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  9. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  10. 48 CFR 552.219-72 - Preparation, Submission, and Negotiation of Subcontracting Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., and Negotiation of Subcontracting Plans. 552.219-72 Section 552.219-72 Federal Acquisition Regulations... Text of Provisions and Clauses 552.219-72 Preparation, Submission, and Negotiation of Subcontracting... Negotiation of Subcontracting Plans (MAR 2012) (a) An offeror, other than a small business concern, submitting...

  11. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  12. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  13. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  14. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  15. 48 CFR 52.226-5 - Restrictions on Subcontracting Outside Disaster or Emergency Area.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracting Outside Disaster or Emergency Area. 52.226-5 Section 52.226-5 Federal Acquisition Regulations... CLAUSES Text of Provisions and Clauses 52.226-5 Restrictions on Subcontracting Outside Disaster or Emergency Area. As prescribed in 26.206(c), insert the following clause: Restrictions on Subcontracting...

  16. 48 CFR 1052.219-71 - Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Subcontracting Plan. 1052... Subcontracting Plan. As prescribed in DTAR 1019.708-70(b), insert the following provision: Subcontracting Plan (MAR 2002) As part of its initial proposal, each large business offeror must submit a contracting plan...

  17. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  18. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services. >

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Subcontracting for nuclear... Clauses 952.225-70 Subcontracting for nuclear hot cell services.> As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  19. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  20. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Subcontracting for nuclear....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  1. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  2. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 3 2013-10-01 2013-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  3. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 3 2011-10-01 2011-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  4. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 3 2014-10-01 2014-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use that clause in all subcontracts. At...

  5. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  6. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  7. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  8. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  9. 46 CFR Sec. 15 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REPAIRS UNDER NATIONAL SHIPPING AUTHORITY MASTER LUMP SUM REPAIR CONTRACT-NSA-LUMPSUMREP Sec. 15 Subcontracts. Under Article 29 of the NSA-LUMPSUMREP Contract, the Contractor is authorized to subcontract...

  10. 48 CFR 2019.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705-4 Reviewing the subcontracting plan...

  11. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract... subcontract level, the CFAO for the subcontractor shall furnish a copy of the negotiation memorandum or the... the prime contractor level. ...

  12. Billie Christen | NREL

    Science.gov Websites

    , administration, and placement of subcontracts for both centers, ensuring that the objectives are met and that the develop budgets for subcontracts and makes sure the subcontracts are properly initiated and closed out in

  13. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  14. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  15. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  16. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Subcontracts under the program. (a) A subcontract for an item or process that does not meet the definition of... adjustment. (b) See 212.7003 for special procedures pertaining to technical data and computer software. [71...

  17. 48 CFR 30.607 - Subcontract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Subcontract administration. 30.607 Section 30.607 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION CAS Administration 30.607 Subcontract...

  18. 48 CFR 219.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business firms specifically identified in the subcontracting plan. Notifications shall be in writing and... SYSTEM, DEPARTMENT OF DEFENSE SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business... business concerns shall include subcontracts with historically black colleges and universities and minority...

  19. 77 FR 9658 - General Services Administration Acquisition Regulation; Information Collection; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-17

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. This information... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  20. 78 FR 59798 - Small Business Subcontracting: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Part 125 RIN 3245-AG22 Small Business Subcontracting: Correction AGENCY: U.S. Small Business Administration. ACTION: Correcting amendments. SUMMARY: This document... business subcontracting to implement provisions of the Small Business Jobs Act of 2010. This correction...

  1. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  2. 14 CFR 1274.510 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 5 2012-01-01 2012-01-01 false Subcontracts. 1274.510 Section 1274.510 Aeronautics and Space NATIONAL AERONAUTICS AND SPACE ADMINISTRATION COOPERATIVE AGREEMENTS WITH COMMERCIAL FIRMS Procurement Standards § 1274.510 Subcontracts. Recipients (individual firms or consortia) are not...

  3. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  4. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  5. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  6. 48 CFR 1644.170 - Policy for FEHB Program subcontracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Policy for FEHB Program subcontracting. 1644.170 Section 1644.170 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND...

  7. 48 CFR 49.108 - Settlement of subcontract settlement proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Settlement of subcontract settlement proposals. 49.108 Section 49.108 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108 Settlement of subcontract...

  8. 48 CFR 1519.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Reviewing the subcontracting plan. 1519.705-4 Section 1519.705-4 Federal Acquisition Regulations System ENVIRONMENTAL... of a proposed subcontracting plan, the Contracting Officer shall obtain advice and recommendations...

  9. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  10. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  11. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  12. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  13. 48 CFR 619.705-6-70 - Reporting responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-disabled veteran-owned small business concerns. This data shall be collected annually and semiannually... SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 619.705-6-70 Reporting... officers shall collect subcontracting data from contractors required to establish subcontracting plans in...

  14. Department of Defense Companies Participating in the Department of Defense Subcontracting Program. First Three Quarters Fiscal Year 1990

    DTIC Science & Technology

    1990-01-01

    This report presents a variety of subcontract data collected from Department of Defense (DOD) large business firms that have received at least one...award in excess of $500,000 ($1,000,000 for construction). Public Law 95-507 requires that these contractors establish a small business and small...disadvantaged business subcontracting program and report to DOD quarterly, using Standard Form 295, on subcontract awards made to these types of firms

  15. 48 CFR 970.1907-1 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...

  16. 77 FR 31016 - General Services Administration Acquisition Regulation; Submission for OMB Review; Preparation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... Negotiation of Subcontracting Plans AGENCY: Office of Acquisition Policy, GSA. ACTION: Notice of request for... requirement regarding preparation, submission, and negotiation of subcontracting plans. A notice was published... contracts. Preparation, submission, and negotiation of subcontracting plans requires for all negotiated...

  17. 13 CFR 126.701 - Can these subcontracting percentages requirements change?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Can these subcontracting percentages requirements change? 126.701 Section 126.701 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION HUBZONE PROGRAM Contract Performance Requirements § 126.701 Can these subcontracting percentages...

  18. 48 CFR 49.606 - Granting subcontract settlement authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-furnished material or articles completed but undelivered under the subcontract or purchase order, as these... articles may be disposed of without Government approval or screening if the total amount (at subcontract... retention or other disposal of termination inventory allocated to the settlement proposal. (ii) Deduct...

  19. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  20. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  1. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  2. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  3. 48 CFR 970.5227-6 - Patent indemnity-subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Patent indemnity... for Management and Operating Contracts 970.5227-6 Patent indemnity—subcontracts. Insert the following clause in solicitations and contracts in accordance with 970.2702-3: Patent Indemnity—Subcontracts (DEC...

  4. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.009 Subcontracting research and development effort. Since the selection of R&D contractors is substantially based on... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Subcontracting research...

  5. Implosion symmetry and ρR measurements on the National Ignition Facility from nascent 27-31 MeV tertiary protons (invited) (abstract)

    NASA Astrophysics Data System (ADS)

    Petrasso, Richard D.

    1997-01-01

    Tertiary protons with birth energies from ˜27 to 30.8 MeV result from the implosion of ignition-scale inertial confinement fusion targets, such as those planned for the National Ignition Facility (NIF). Measurement of the tertiaries' slowing can provide a determination of the imploded areal density of the fuel capsule, as well as implosion asymmetry that results from anisotropy of the areal density and plasma temperature. In order to determine the utility of tertiaries for all phases of the NIF, we analyze three representative cases: a gas capsule (0.7 kJ yield); a cryogenic fuel capsule that fails to ignite (15 kJ); and a cryogenic fuel capsule that ignites and burns (13 000 kJ). In each case, tertiaries escape from the capsule and convey critical information about implosion dynamics. In addition, we show that for some gas-capsule implosions anticipated on OMEGA, tertiaries may be the only species of energetic charged particles that can determine the fuel areal density. Presently, we are building a charge-coupled device (CCD)-based charged particle spectrometer for OMEGA and for NOVA. In addition to the tertiaries, the spectrometers are sensitive to a variety of the energetic charged particles, such as knock-on protons, deuterons, and tritons, and 3He-burnup protons. In fact the latter set of charged particles will usually be the dominant signal. We will describe the basic features of the spectrometers and the measured response of the CCDs to 1-5 MeV protons, 1-5 MeV alphas, and 14 MeV neutrons (and associated gammas), the latter constitute the principal source of noise. This work is done in collaboration with C. K. Li, D. Hicks, and F. Seguin of MIT; with B. Burke of LL/MIT; with M. Cable, S. Pollaine, S. Haan, T. Bernat, T. Phillips, and J. Kilkenny of LLNL; with J, Knauer, S. Cremer, C. Verdon, and B. Kremens of University of Rochester; and with C. Ruiz and R. Leeper of SNL. This work is supported in part by LLNL Subcontract B313875 and University of Rochester Subcontract 410025-G.

  6. Production and Optimization of Direct Coal Liquefaction derived Low Carbon-Footprint Transportation Fuels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steven Markovich

    This report summarizes works conducted under DOE Contract No. DE-FC26-05NT42448. The work scope was divided into two categories - (a) experimental program to pretreat and refine a coal derived syncrude sample to meet transportation fuels requirements; (b) system analysis of a commercial scale direct coal liquefaction facility. The coal syncrude was derived from a bituminous coal by Headwaters CTL, while the refining study was carried out under a subcontract to Axens North America. The system analysis included H{sub 2} production cost via six different options, conceptual process design, utilities requirements, CO{sub 2} emission and overall plant economy. As part ofmore » the system analysis, impact of various H{sub 2} production options was evaluated. For consistence the comparison was carried out using the DOE H2A model. However, assumptions in the model were updated using Headwaters database. Results of Tier 2 jet fuel specifications evaluation by the Fuels & Energy Branch, US Air Force Research Laboratory (AFRL/RZPF) located at Wright Patterson Air Force Base (Ohio) are also discussed in this report.« less

  7. 48 CFR 215.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Subcontract pricing considerations. 215.404-3 Section 215.404-3 Federal Acquisition Regulations System DEFENSE ACQUISITION... Contract Pricing 215.404-3 Subcontract pricing considerations. Follow the procedures at PGI 215.404-3 when...

  8. 76 FR 61626 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-05

    ... SMALL BUSINESS ADMINISTRATION 13 CFR Parts 121 and 125 RIN 3245-AG22 Small Business Subcontracting AGENCY: U.S. Small Business Administration. ACTION: Proposed rule. SUMMARY: The U.S. Small Business... Business Jobs Act of 2010, which pertain to small business subcontracting. SBA is proposing to amend its...

  9. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  10. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  11. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  12. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  13. 48 CFR 1827.304-4 - Subcontracts. (NASA supplements paragraph (a))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Subcontracts. (NASA supplements paragraph (a)) 1827.304-4 Section 1827.304-4 Federal Acquisition Regulations System NATIONAL... Rights Under Government Contracts 1827.304-4 Subcontracts. (NASA supplements paragraph (a)) (a)(i) Unless...

  14. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  15. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  16. 48 CFR 970.5236-1 - Government facility subcontract approval.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Government facility... and Contract Clauses for Management and Operating Contracts 970.5236-1 Government facility subcontract approval. As prescribed at 48 CFR 970.3605-2, insert the following clause: Government Facility Subcontract...

  17. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  18. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  19. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  20. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  1. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  2. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  3. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  4. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  5. 48 CFR 2452.219-70 - Small business subcontracting plan compliance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... of Provisions and Clauses 2452.219-70 Small business subcontracting plan compliance. As prescribed in 2419.708(d), insert the following provision: Small Business Subcontracting Plan Compliance (FEB 2006...

  6. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  7. 48 CFR 2452.219-74 - Small business subcontracting goals.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 2452.219-74 Small business subcontracting goals. As prescribed in 2419.708(b), insert the following provision: Small Business Subcontracting Goals (DEC 2012) (a) This provision does not...

  8. 48 CFR 1852.219-75 - Small business subcontracting reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-75 Small business subcontracting reporting. As prescribed in 1819.708-70(b), insert the following clause: Small Business Subcontracting Reporting (MAY 1999) (a) The Contractor shall...

  9. 48 CFR 31.204 - Application of principles and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-price subcontract with economic price adjustment provisions. (c) Costs incurred as payments under firm-fixed-price subcontracts or fixed-price subcontracts with economic price adjustment provisions or... captures the essential nature of, the cost at issue. [48 FR 42301, Sept. 19, 1983, as amended at 53 FR...

  10. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...

  11. 25 CFR 276.16 - Subgrants and subcontracts to non-profit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Subgrants and subcontracts to non-profit organizations. 276.16 Section 276.16 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR INDIAN SELF... Subgrants and subcontracts to non-profit organizations. The uniform administrative requirements in this part...

  12. Companies Participating in the Department of Defense Subcontracting Program. First Quarter, Fiscal Year 1995.

    DTIC Science & Technology

    1995-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has a section for each of the...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and disadvantaged businesses. The

  13. 48 CFR 952.225-70 - Subcontracting for nuclear hot cell services.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... hot cell services. 952.225-70 Section 952.225-70 Federal Acquisition Regulations System DEPARTMENT OF....225-70 Subcontracting for nuclear hot cell services. As prescribed in 925.7004, insert the following clause in solicitations and contracts: Subcontracting for Nuclear Hot Cell Services (MAR 1993) (a...

  14. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  15. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  16. 78 FR 17671 - Federal Acquisition Regulation; Submission for OMB Review; Summary Subcontract Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Administration (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Notice of request for... for DOD and NASA) of subcontracts awarded by prime and subcontractors for a specific Federal... data from Alaskan Native Corporations and Indian Tribe concerns under a subcontracting plan with the...

  17. 45 CFR 650.17 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 3 2012-10-01 2012-10-01 false Subcontracts. 650.17 Section 650.17 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION PATENTS § 650.17 Subcontracts. As provided in paragraph (g) of the Patent Rights clause in § 650.4(a), awardees should normally use...

  18. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  19. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  20. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  1. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  2. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  3. 48 CFR 852.219-9 - VA Small business subcontracting plan minimum requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false VA Small business... Provisions and Clauses 852.219-9 VA Small business subcontracting plan minimum requirements. As prescribed in subpart 819.709, insert the following clause: VA Small Business Subcontracting Plan Minimum Requirements...

  4. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  5. 48 CFR 1852.219-73 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Small business... Provisions and Clauses 1852.219-73 Small business subcontracting plan. As prescribed in 1819.708-70(a), insert the following provision: Small Business Subcontracting Plan (MAY 1999) (a) This provision is not...

  6. Final Report on the Audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company

    DTIC Science & Technology

    1990-12-03

    This is our final report on the audit of Subcontract Prices on Firm-Fixed-Price Contracts Awarded to McDonnell Aircraft Company (MCAIR). The Contract Management Directorate made the audit from October 1989 through June 1990. The objective of the audit was to compare proposed and negotiated subcontract prices and determine reasons for significant variances. We also evaluated applicable internal control procedures. For a 6-month period ending December 1989, MCAIR issued 517 subcontracts valued at $679 million.

  7. Investigation of Micro- and Macro-Scale Transport Processes for Improved Fuel Cell Performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gu, Wenbin

    2014-08-29

    This report documents the work performed by General Motors (GM) under the Cooperative agreement No. DE-EE0000470, “Investigation of Micro- and Macro-Scale Transport Processes for Improved Fuel Cell Performance,” in collaboration with the Penn State University (PSU), University of Tennessee Knoxville (UTK), Rochester Institute of Technology (RIT), and University of Rochester (UR) via subcontracts. The overall objectives of the project are to investigate and synthesize fundamental understanding of transport phenomena at both the macro- and micro-scales for the development of a down-the-channel model that accounts for all transport domains in a broad operating space. GM as a prime contractor focused onmore » cell level experiments and modeling, and the Universities as subcontractors worked toward fundamental understanding of each component and associated interface.« less

  8. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  9. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  10. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  11. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... provisions. (b) The STD shall not permit any of the contract work to be performed under a subcontract, unless such arrangement has been authorized by the STD in writing. Prior to authorizing a subcontract, the STD... and requirements of the prime contract. The Division Administrator may permit the STD to satisfy the...

  12. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  13. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  14. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  15. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  16. 48 CFR 219.1203 - Incentive subcontracting with small disadvantaged business concerns.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... opportunities for SDB concerns in negotiated acquisitions by providing monetary incentives in the North American... participation of SDB concerns is currently authorized (see FAR 19.201(b)). Incentives for exceeding SDB subcontracting targets shall be paid only if an SDB subcontracting target was exceeded as a result of actual...

  17. 48 CFR 212.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 212.504 Section 212.504 Federal... PLANNING ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items 212.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  18. Department of Defense Companies Participating in the Department of Defense Subcontracting Program, First Quarter Fiscal Year 1994

    DTIC Science & Technology

    1994-01-01

    disadvantaged businesses. Approximately 1,000 companies report these data each quarter during a fiscal year. The report has section for each of the Military...subcontracting surveillance review, net value of subcontract awards, and the amount and percent of awards to small and small disadvantaged businesses. The

  19. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Prime contractor performance requirements (limitations on subcontracting). 125.6 Section 125.6 Business Credit and Assistance SMALL BUSINESS... subcontracting). (a) In order to be awarded a full or partial small business set-aside contract, an 8(a) contract...

  20. 40 CFR 35.4240 - What provisions must my group's TAG contractor comply with if it subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false What provisions must my group's TAG contractor comply with if it subcontracts? 35.4240 Section 35.4240 Protection of Environment ENVIRONMENTAL... with if it subcontracts? A TAG contractor must comply with the following provisions when awarding...

  1. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  2. 22 CFR 228.37 - Nationality of employees under contracts or subcontracts for services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... subcontracts for services. 228.37 Section 228.37 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT RULES ON SOURCE, ORIGIN AND NATIONALITY FOR COMMODITIES AND SERVICES FINANCED BY USAID Conditions Governing... contracts or subcontracts for services. (a) The rules set forth in §§ 228.31 through 228.36 do not apply to...

  3. 48 CFR 12.504 - Applicability of certain laws to subcontracts for the acquisition of commercial items.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... laws to subcontracts for the acquisition of commercial items. 12.504 Section 12.504 Federal Acquisition... Applicability of Certain Laws to the Acquisition of Commercial Items and Commercially Available Off-The-Shelf Items 12.504 Applicability of certain laws to subcontracts for the acquisition of commercial items. (a...

  4. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  5. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  6. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  7. 48 CFR 52.219-9 - Small business subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting program reporting. The eSRS is located at http://www.esrs.gov. Indian tribe means any Indian tribe... Bureau of Indian Affairs in accordance with 25 U.S.C. 1452(c). This definition also includes Indian-owned... awarded to an ANC or Indian tribe shall be counted towards the subcontracting goals for small business and...

  8. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 2 Grants and Agreements 1 2012-01-01 2012-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  9. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  10. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 2 Grants and Agreements 1 2013-01-01 2013-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  11. 2 CFR 2520.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 2 Grants and Agreements 1 2014-01-01 2014-01-01 false What contracts and subcontracts, in addition... Agreements Federal Agency Regulations for Grants and Agreements NATIONAL SCIENCE FOUNDATION NONPROCUREMENT DEBARMENT AND SUSPENSION Covered Transactions § 2520.220 What contracts and subcontracts, in addition to...

  12. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.A. Scroppo

    1998-07-01

    This is the Technical Progress Report covering June 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  13. SIMULATED COAL GAS MCFC POWER PLANT SYSTEM VERIFICATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-10-31

    This is the Technical Progress Report covering October 1998. All tasks have been completed, except for those discussed on the following pages. Unocal estimated the costs of dismantling and packaging the test facility for storage and shipment. The scope of work for the contract has been modified to accommodate the dismantling and packaging of the plant. An amendment to Sub-Contract No. MCP-9-UNO between M-C Power and Unocal has been executed which includes the Scope of Work in Unocal's cost estimate.

  14. 2 CFR 801.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 2 Grants and Agreements 1 2010-01-01 2010-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 801.220 Section 801.220 Grants and... DEBARMENT AND SUSPENSION Covered Transactions § 801.220 What contracts and subcontracts, in addition to...

  15. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  16. Scientific Data Analysis and Software Support: Geodynamics

    NASA Technical Reports Server (NTRS)

    Klosko, Steven; Sanchez, B. (Technical Monitor)

    2000-01-01

    The support on this contract centers on development of data analysis strategies, geodynamic models, and software codes to study four-dimensional geodynamic and oceanographic processes, as well as studies and mission support for near-Earth and interplanetary satellite missions. SRE had a subcontract to maintain the optical laboratory for the LTP, where instruments such as MOLA and GLAS are developed. NVI performed work on a Raytheon laser altimetry task through a subcontract, providing data analysis and final data production for distribution to users. HBG had a subcontract for specialized digital topography analysis and map generation. Over the course of this contract, Raytheon ITSS staff have supported over 60 individual tasks. Some tasks have remained in place during this entire interval whereas others have been completed and were of shorter duration. Over the course of events, task numbers were changed to reflect changes in the character of the work or new funding sources. The description presented below will detail the technical accomplishments that have been achieved according to their science and technology areas. What will be shown is a brief overview of the progress that has been made in each of these investigative and software development areas. Raytheon ITSS staff members have received many awards for their work on this contract, including GSFC Group Achievement Awards for TOPEX Precision Orbit Determination and the Joint Gravity Model One Team. NASA JPL gave the TOPEX/POSEIDON team a medal commemorating the completion of the primary mission and a Certificate of Appreciation. Raytheon ITSS has also received a Certificate of Appreciation from GSFC for its extensive support of the Shuttle Laser Altimeter Experiment.

  17. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  18. 48 CFR 927.404 - Rights in technical data in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... in subcontracts. (DOE coverage-paragraphs (g), (k), (l), and (m)) 927.404 Section 927.404 Federal...—paragraphs (g), (k), (l), and (m)) (g)(4) Contractors are required by paragraph (d)(3) of the clause at FAR... paragraph (e) of the clause at 48 CFR 970.5227-2 Rights in Data—Technology Transfer. (k) Subcontracts. (1)(i...

  19. Report on Contractual Flow Down Provisions in the Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplement (DFARS)

    DTIC Science & Technology

    2017-11-01

    Richard Ginman, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts...publication, A Study of the Applicability of Federal Acquisition Regulation (FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts, http...FAR) Clauses to Subcontracts under Prime Defense and NASA Contracts. Arlington, VA: National Defense Industrial Association NDIA), 2016. http

  20. 48 CFR 44.305-2 - Notification.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... approved. The system approval notification shall identify the class or classes of subcontracts requiring... has revealed sufficient weaknesses in a particular area of subcontracting to warrant special attention...

  1. Final Report: Sintered CZTS Nanoparticle Solar Cells on Metal Foil; July 26, 2011 - July 25, 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leidholm, C.; Hotz, C.; Breeze, A.

    2012-09-01

    This is the final report covering 12 months of this subcontract for research on high-efficiency copper zinc tin sulfide (CZTS)-based thin-film solar cells on flexible metal foil. Each of the first three quarters of the subcontract has been detailed in quarterly reports. In this final report highlights of the first three quarters will be provided and details will be given of the final quarter of the subcontract.

  2. 48 CFR 244.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent to Subcontracts 244.202-2 Considerations. (a) Where other than lowest price is the basis for subcontractor selection, has...

  3. Safety Climate and Occupational Stress According to Occupational Accidents Experience and Employment Type in Shipbuilding Industry of Korea.

    PubMed

    Kim, Kyung Woo; Park, Sung Jin; Lim, Hae Sun; Cho, Hm Hak

    2017-09-01

    Safety climate and occupational stress are related with occupational accident. The present study tried to identify the differences in safety climate and occupational stress according to occupational accidents experience and employment type (e.g., direct workers and subcontract workers). In this study, we conducted a survey using safety climate scale and Korean Occupational Stress Scale and classified the participants into four groups: direct workers working for accident-free departments, direct workers working for accident departments, subcontract workers working for accident-free departments, and subcontract workers working for accident departments for 2 years within the same workplace in the shipbuilding industry. The direct workers and subcontract workers showed diverse results in subscales of safety climate and occupational stress. This result is supported by existing studies; however, further study is necessary for more supporting evidence and elaborative methodological approach. The necessity of management for safety climate and psychosocial factor such as occupational stress for both direct workers and subcontract workers as a whole is suggested by this study.

  4. 77 FR 14016 - General Services Administration Acquisition Regulation; Preparation, Submission, and Negotiation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., Submission, and Negotiation of Subcontracting Plans; Correction AGENCY: General Services Administration (GSA..., Preparation, Submission, and Negotiation of Subcontracting Plans; Correction. Correction In the information...

  5. 48 CFR 3019.705 - Responsibilities for the contracting officer under the subcontracting program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System DEPARTMENT OF HOMELAND SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705...

  6. 48 CFR 19.701 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-based system for small business subcontracting program reporting. Failure to make a good faith effort to... planned subcontracting in support of the specific contract, except that indirect costs incurred for common...

  7. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION CLAUSES AND FORMS SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 552..., historical performance and significant achievements in placing subcontracts for the same or similar products...

  8. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  9. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... small business concerns, HUBZone small business concerns, small disadvantaged business concerns, women... member firm of the Alaska Native Corporations or an Indian tribe. Only subcontracts involving performance...

  10. 48 CFR 2019.705 - Responsibilities of the contracting officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System NUCLEAR REGULATORY COMMISSION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 2019.705...

  11. 48 CFR 49.108-4 - Authorization for subcontract settlements without approval or ratification.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-4 Authorization for subcontract settlements without approval or ratification. (a)(1) The...

  12. 48 CFR 970.4102-1 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DOE to acquire utility service(s) by subcontract, i.e., what the benefits are, such as economic..., shall be applied to a subcontract level acquisition for furnishing utility services to a facility owned...

  13. 48 CFR 319.705 - Responsibilities of the Contracting Officer under the subcontracting assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations System HEALTH AND HUMAN SERVICES SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS Subcontracting With Small Business, Small Disadvantaged Business, and Women-Owned Small Business Concerns 319.705...

  14. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  15. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ..., and SF-295, Summary Subcontract Report; or entering the same information into an electronic database... to achieve its goal in one socio-economic category, it over-achieved its goal by an equal or greater...

  16. 48 CFR 227.304-1 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Contracts 227.304-1 General. Interim and final invention reports and notification of all subcontracts for... of Inventions and Subcontracts. [56 FR 36389, July 31, 1991, as amended at 57 FR 53600, Nov. 12, 1992] ...

  17. 48 CFR 49.202 - Profit.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....202 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS Additional Principles for Fixed-Price Contracts Terminated for Convenience 49.202...) Character and difficulty of subcontracting, including selection, placement, and management of subcontracts...

  18. 48 CFR 952.250-70 - Nuclear hazards indemnity agreement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... obligation under this contract and shall be unaffected by the death, disability, or termination of existence...) Inclusion in subcontracts. The Contractor shall insert this clause in any subcontract which may involve the...

  19. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  20. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  1. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  2. 48 CFR 552.219-73 - Goals for Subcontracting Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: Goals for Subcontracting Plan (JUN 2005) (a) Maximum practicable utilization of small, HUBZone small... correct deficiencies in a plan within the time specified by the Contracting Officer shall make the offeror...

  3. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  4. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  5. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  6. 48 CFR 970.1907 - The Small Business Subcontracting Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false The Small Business... AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small Business Programs 970.1907 The Small Business Subcontracting Program. ...

  7. 14 CFR 1274.103 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... Subcontracting dollar threshold. The dollar amount of the cooperative agreement subject to the small business subcontracting policies (includes small business, veteran-owned small business, service-disabled veteran-owned small business, historically underutilized small business, small disadvantaged business, women-owned...

  8. Mesoscale Modeling of Kinetic Phase Behaviors in Mg-B-H (Subcontract Report)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yu, H.; Thornton, K.; Wood, B. C.

    Storage of hydrogen on board vehicles is one of the critical enabling technologies for creating hydrogenfueled transportation systems that can reduce oil dependency and mitigate the long-term effects of fossil fuels on climate change. Stakeholders in developing hydrogen infrastructure are currently focused on highpressure storage at 350 bar and 700 bar, in part because no viable solid-phase storage material has emerged. Nevertheless, solid-state materials, including high-density hydrides, remain of interest because of their unique potential to meet all DOE targets and deliver hydrogen at lower pressures and higher on-board densities. A successful solution would significantly reduce costs and ensure themore » economic viability of a U.S. hydrogen infrastructure. The Mg(BH 4) 2-MgB 2 system represents a highly promising solution because of its reasonable reaction enthalpy, high intrinsic capacity, and demonstrated reversibility, yet suffers from poor reaction kinetics. This subcontract aims to deliver a phase-field model for the kinetics of the evolution of the relevant phases within the Mg-B-H system during hydrogenation and dehydrogenation. This model will be used within a broader theory, synthesis, and characterization framework to study the properties of geometry-selected nanoparticles of pristine and doped MgB 2/Mg(BH 4) 2 with two aims: (1) understand the intrinsic limitations in (de)hydrogenation; (2) devise strategies for improving thermodynamics and kinetics through nanostructuring.« less

  9. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... feasible units, as appropriate, to facilitate small business participation; (ii) Conducting market research... its subcontracting plan. (e) CMR Responsibilities. Commercial Market Representatives (CMRs) are SBA's... other resources and tools; (4) Counseling small business concerns on how to market themselves to large...

  10. Minority On-Line Information Service (MOLIS): A minority research and education information service. Final report for Department of Energy Grant No. DE-FG02-90ER75602

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rodman, John A.

    MOLIS is an online database of minority institutions, and is used by federal agencies to identify peer reviewers and by majority institutions to identify possible collaborations and sub-contracts. MOLIS includes in-depth information about the research and educational capabilities of Historically Black Colleges and Universities (HBCUs), Hispanic Serving Institutions (HSIs), and Tribal Colleges. Included with this report are several annual progress reports, a list of all minority institutions currently on MOLIS, a list of outreach activities, etc.

  11. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    2013-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  12. Earned Value Management (EVM) Implementation Handbook

    NASA Technical Reports Server (NTRS)

    Terrell, Stefanie M.; Richards, Brad W.

    2018-01-01

    The purpose of this handbook is to provide Earned Value Management (EVM) guidance for the effective application, implementation, and utilization of EVM on NASA programs, projects, major contracts and subcontracts in a consolidated reference document. EVM is a project management process that effectively integrates a project?s scope of work with schedule and cost elements for optimum project planning and control. The goal is to achieve timely and accurate quantification of progress that will facilitate management by exception and enable early visibility into the nature and the magnitude of technical problems as well as the intended course and success of corrective actions.

  13. 48 CFR 2944.202 - Contracting officer's evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contracting officer's evaluation. 2944.202 Section 2944.202 Federal Acquisition Regulations System DEPARTMENT OF LABOR CONTRACT MANAGEMENT SUBCONTRACTING POLICIES AND PROCEDURES Consent To Subcontract 2944.202 Contracting officer's...

  14. 48 CFR 44.202-1 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 44.202-1 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT... notification and supporting data to ensure that the proposed subcontract is appropriate for the risks involved... during negotiations, the contracting officer shall identify those subcontracts in paragraph (j) of the...

  15. 13 CFR 121.410 - What are the size standards for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Size Eligibility Requirements for Government Procurement § 121.410 What are the size standards for SBA... Small Business Act, a concern is small for subcontracts which relate to Government procurements if it...

  16. Subcontracting Opportunities with DoD Major Prime Contractors

    DTIC Science & Technology

    1996-06-01

    The Department of Defense (DoD) offers two markets for small business and small disadvantaged business seeking defense contracting and defense...opportunities. The publication exclusively addresses the defense subcontracting opportunities market. The DoD encourages small business and small disadvantaged

  17. 48 CFR 44.301 - Objective.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Objective. 44.301 Section... SUBCONTRACTING POLICIES AND PROCEDURES Contractors' Purchasing Systems Reviews 44.301 Objective. The objective of... which the contractor spends Government funds and complies with Government policy when subcontracting...

  18. 23 CFR 635.116 - Subcontracting and contractor responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.116 Subcontracting and contractor responsibilities. (a) Contracts for projects shall specify the minimum percentage of work that a... total original contract price excluding any identified specialty items. Specialty items may be performed...

  19. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  20. 48 CFR 1419.705-2 - Determining the need for a subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Determining the need for a subcontracting plan. 1419.705-2 Section 1419.705-2 Federal Acquisition Regulations System DEPARTMENT OF THE... recommendations offered. ...

  1. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  2. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  3. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  4. 48 CFR 5.206 - Notices of subcontracting opportunities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracts, to increase participation by qualified HUBZone small business, small, small disadvantaged, women-owned small business, veteran-owned small business and service-disabled veteran-owned small business.... (b) The notices must describe— (1) The business opportunity; (2) Any prequalification requirements...

  5. NREL Photovoltaic Program FY 1995 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-06-01

    This report summarizes the in-house and subcontracted R&D activities from Oct. 1994 through Sept. 1995; their objectives are to conduct basic, applied, and engineering research, manage subcontracted R&D projects, perform research complementary to subcontracted work, develop and maintain state-of-the-art measurement and device capabilities, develop PV manufacturing technology and modules, transfer results to industry, and evolve viable partnerships for PV systems and market development. The research activities are grouped into 5 sections: crystalline Si and advanced devices, thin-film PV, PV manufacturing, PV module and system performance and engineering, and PV applications and market development.

  6. 48 CFR 35.009 - Subcontracting research and development effort.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the best scientific and technological sources, it is important that the contractor not subcontract technical or scientific work without the contracting officer's advance knowledge. During the negotiation of a cost-reimbursement R&D contract, the contracting officer shall obtain complete information...

  7. 48 CFR 1652.244-70 - Subcontracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Subcontracts. 1652.244-70 Section 1652.244-70 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses...

  8. 42 CFR 422.202 - Participation procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... procedures. (a) Notice and appeal rights. An MA organization that operates a coordinated care plan or network... of groups of physicians, through reasonable procedures that include the following: (1) Written notice... guidelines. (c) Subcontracted groups. An MA organization that operates an MA plan through subcontracted...

  9. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  10. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  11. 14 CFR 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  12. 76 FR 74749 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... amend its regulations to implement provisions of the Small Business Jobs Act of 2010 (Jobs Act... used in preparing its bid or proposal during contract performance. SBA also proposed to amend its... and evaluating small business subcontracting plan performance. SBA also proposed to clarify which...

  13. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Definitions. 30.001...

  14. 48 CFR 2919.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Subcontracting plan requirements. 2919.704 Section 2919.704 Federal Acquisition Regulations System DEPARTMENT OF LABOR... plans to the Office of Small Business Programs for review and recommendation before awarding contracts...

  15. 48 CFR 30.001 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... REQUIREMENTS COST ACCOUNTING STANDARDS ADMINISTRATION 30.001 Definitions. As used in this part— Affected CAS-covered contract or subcontract means a contract or subcontract subject to Cost Accounting Standards (CAS) rules and regulations for which a contractor or subcontractor— (1) Used one cost accounting practice to...

  16. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  17. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  18. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  19. 48 CFR 19.708 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.708 Contract clauses. (a) Insert the clause at 52.219-8, Utilization of Small Business Concerns, in solicitations and contracts... clause at 52.219-9, Small Business Subcontracting Plan, in solicitations and contracts that offer...

  20. Monitoring the Hazards of Silicic Volcanoes with Remote Sensing

    NASA Technical Reports Server (NTRS)

    Fink, Jonathan; Wessels, Rick; Eisinger, Chris; Ramsey, Michael; Hellman, Melanie; Kuhn, Sally

    2004-01-01

    This report details the final progress on the Solid Earth and Natural Hazards project: Monitoring of Hazards of Silicic Volcanoes with Remote Sensing (SENH99-0000-0159). The original award went to Arizona State University (ASU) with Dr. Jonathan Fink as the P.I. and Dr. Michael Ramsey as the Co-I. In May 2000, Dr. Ramsey left ASU to take a tenure-track faculty position at the University of Pittsburgh. The principle investigators and NASA Headquarters agreed to split the grant award at the HQ level and therefore avoid the double overhead charges that would arise from a university subcontract. The objectives of the science were divided, and coordinated yearly progress reports have been submitted from each University. This report details the final progress on work carried out at Arizona State. A report by Dr. Ramsey at the University of Pittsburgh has already been submitted. The work from both institutions is closely related and this report will reflect that connection.

  1. High Technology Engineering Services, Inc. fiscal year 1993 and 1994 research and development report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This document has been prepared by the Professional Staff of High Technology Engineering Services, Inc. (HTES) for fiscal year (FY) 1993. Work was performed for various aspects of mechanical design and analysis, materials development and properties quantification, nuclear environment performance, and engineering program prioritization. The tasks enumerated in the subcontract, attachment B are: 1. Assist in preparation of final R&D report for SDC detector development. 2. Subcontractor shall make contributions to the development of innovative processes for the manufacture of quasi- isotropic, enhanced thermal conductivity compression molded advanced composite materials. 3. Perform finite element analysis as it relates to themore » Superconducting Super Collider Silicon Tracking System, both mechanical and thermal, of very thin section advanced composite materials. 4. Subcontractor shall perform technical studies, reviews, and assessments of the current program for advanced composites materials processing and testing. 5. Subcontractor shall attend meetings and discussions as directed by MEE-12 technical representative. Unfortunately during the course of FY93, technical and financial challenges prevailed against the aggressive goals set for the program. In point of fact, less than 25% of the contract value was able to be expended due to technical delays and programmatic funding cuts. Also, contracting difficulties with the SSC Lab and financial burdens at Los Alamos totally stopped progress on the subject subcontract during the whole of FY94. This was a great blow to me and the HTES, Inc. technical staff. Despite the negative influences over the years, significant progress was made in materials properties quantification and development of essential research and development documentation. The following brief report and attendant appendices will address these achievements.« less

  2. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  3. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  4. 48 CFR 15.404-3 - Subcontract pricing considerations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.404-3 Subcontract..., including subcontractor's certified cost or pricing data. (b) The prime contractor or subcontractor shall... paragraph (c) of this subsection, submit subcontractor certified cost or pricing data to the Government as...

  5. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  6. 48 CFR 319.705-5 - Awards involving subcontracting plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Awards involving subcontracting plans. 319.705-5 Section 319.705-5 Federal Acquisition Regulations System HEALTH AND HUMAN... contract award package, depending upon the circumstances and complexity of the individual acquisition. ...

  7. 48 CFR 1252.217-74 - Subcontracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Subcontracts. 1252.217-74 Section 1252.217-74 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CLAUSES AND FORMS...) Nothing contained in the contract shall be construed as creating any contractual relationship between any...

  8. 14 CFR § 1260.151 - Monitoring and reporting program performance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Records § 1260.151 Monitoring and reporting program performance. (a) Recipients are responsible for managing and monitoring each project, program, subcontract, function or activity supported by the award. Recipients shall monitor subcontracts to ensure subcontractors have met the audit requirements as delineated...

  9. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  10. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  11. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  12. 48 CFR 19.704 - Subcontracting plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) Separate percentage goals for using small business (including ANCs and Indian tribes), veteran-owned small... business (including ANCs and Indian tribes) and women-owned small business concerns as subcontractors; (2... planned to be subcontracted to small business (including ANCs and Indian tribes), veteran-owned small...

  13. 13 CFR 125.3 - Subcontracting assistance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other resources and tools; (4) Counseling small business concerns on how to market themselves to large... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Subcontracting assistance. 125.3 Section 125.3 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION GOVERNMENT CONTRACTING PROGRAMS...

  14. Subcontracted activities related to TES for building heating and cooling

    NASA Technical Reports Server (NTRS)

    Martin, J.

    1980-01-01

    The subcontract program elements related to thermal energy storage for building heating and cooling systems are outlined. The following factors are included: subcontracts in the utility load management application area; life and stability testing of packaged low cost energy storage materials; and development of thermal energy storage systems for residential space cooling. Resistance storage heater component development, demonstration of storage heater systems for residential applications, and simulation and evaluation of latent heat thermal energy storage (heat pump systems) are also discussed. Application of thermal energy storage for solar application and twin cities district heating are covered including an application analysis and technology assessment of thermal energy storage.

  15. 29 CFR 4.114 - Subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Covered Contracts Generally § 4.114 Subcontracts. (a) “Contractor” as including “subcontractor... contractor undertakes a contract subject to the Act, the contractor agrees to assume the obligation that the...

  16. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  17. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  18. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  19. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  20. 48 CFR 1852.219-82 - Limitation on subcontracting-STTR program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... performed by the research institution. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval. (End of clause) [71 FR...

  1. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  2. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  3. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  4. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  5. 24 CFR 115.309 - Subcontracting under the FHAP.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... electronic information technologies that are accessible in accordance with the Americans with Disability Act... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Subcontracting under the FHAP. 115.309 Section 115.309 Housing and Urban Development Regulations Relating to Housing and Urban...

  6. 48 CFR 49.108-7 - Government assistance in settling subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Government assistance in settling subcontracts. 49.108-7 Section 49.108-7 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-7 Government assistance in...

  7. 48 CFR 49.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 49.107 Section 49.107 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49...

  8. 48 CFR 12.500 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ACQUISITION OF COMMERCIAL ITEMS Applicability of Certain Laws to the Acquisition of Commercial Items and... law that are not applicable to— (1) Contracts for the acquisition of commercial items; (2) Subcontracts, at any tier, for the acquisition of commercial items; and (3) Contracts and subcontracts, at any...

  9. 77 FR 29983 - Federal Acquisition Regulation; Information Collection; Subcontract Consent

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... performance of functions of the Federal Acquisition Regulation (FAR), and whether it will have practical... The objective of consent to subcontract, as discussed in FAR Part 44, is to evaluate the efficiency and effectiveness with which the contractor spends Government funds, and complies with Government...

  10. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  11. 48 CFR 52.219-26 - Small Disadvantaged Business Participation Program-Incentive Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT CLAUSES Text of Provisions and Clauses 52.219-26 Small Disadvantaged Business Participation... the following: Small Disadvantaged Business Participation Program—Incentive Subcontracting (OCT 2000... its offer to try to award a certain amount to small disadvantaged business concerns in the North...

  12. 41 CFR 51-4.4 - Subcontracting.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Subcontracting. 51-4.4 Section 51-4.4 Public Contracts and Property Management Other Provisions Relating to Public Contracts... both with efficient performance in furnishing commodities or services under the JWOD Act and maximizing...

  13. 48 CFR 9.104-3 - Application of standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., that will be in existence at the time of contract award, to rent, purchase, or otherwise acquire the... requires a subcontracting plan pursuant to Subpart 19.7, The Small Business Subcontracting Program, the... prospective contractor's responsibility. (d)(1) Small business concerns. Upon making a determination of...

  14. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 7 2011-10-01 2011-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  15. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 7 2014-10-01 2014-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  16. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 7 2012-10-01 2012-10-01 false Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  17. 48 CFR 3052.219-70 - Small Business subcontracting program reporting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 7 2013-10-01 2012-10-01 true Small Business... SOLICITATION PROVISIONS AND CONTRACT CLAUSES Text of Provisions and Clauses 3052.219-70 Small Business...: Small Business Subcontracting Plan Reporting (JUN 2006) (a) The Contractor shall enter the information...

  18. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  19. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  20. 48 CFR 19.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 19.705-4... involving small business concerns as subcontractors in similar acquisitions; and (3) The relative success of... comply with its obligations under the clause at 52.219-8, Utilization of Small Business Concerns, the...

  1. Webinar May 17: Fuel Cell Electric Bus Progress Toward Meeting Technical

    Science.gov Websites

    Targets | News | NREL Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets Webinar May 17: Fuel Cell Electric Bus Progress toward Meeting Technical Targets May 14, 2018 The U.S. Department of Energy's (DOE's) Fuel Cell Technologies Office will present a live webinar titled

  2. 48 CFR 52.219-16 - Liquidated Damages-Subcontracting Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... following clause: Liquidated Damages—Subcontracting Plan (JAN 1999) (a) Failure to make a good faith effort... has failed to make such good faith effort, the Contracting Officer shall give the Contractor written notice specifying the failure and permitting the Contractor to demonstrate what good faith efforts have...

  3. 48 CFR 970.1907 - Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business, Small Disadvantaged Business and Woman-Owned Small Business Concerns. 970.1907 Section 970.1907... MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907 Subcontracting with Small Business, Small Disadvantaged Business and Woman-Owned Small Business...

  4. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  5. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and subcontract incentives, fees, and profits associated with the increased or decreased costs to the... increase or decrease in contract and subcontracts incentives, fees, and profits associated with the... desirable and not detrimental to the Government and is, therefore, not subject to the no increased cost...

  6. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... must be approved in advance and in writing by the Contracting Officer. Since the selection of R&D contractors is substantially based on the best scientific and technological sources, it is important that the Contractor not subcontract technical or scientific work without the Contracting Officer's advance approval...

  7. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 1 2010-07-01 2010-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  8. 41 CFR 60-1.45 - Existing contracts and subcontracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 1 2011-07-01 2009-07-01 true Existing contracts and subcontracts. 60-1.45 Section 60-1.45 Public Contracts and Property Management Other Provisions Relating to... OF LABOR 1-OBLIGATIONS OF CONTRACTORS AND SUBCONTRACTORS Ancillary Matters § 60-1.45 Existing...

  9. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... economic development of resources in Burma. 537.410 Section 537.410 Money and Finance: Treasury Regulations... BURMESE SANCTIONS REGULATIONS Interpretations § 537.410 Contracts and subcontracts regarding economic... supervision and guarantee of another person's performance of a contract that includes the economic development...

  10. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  11. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  12. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  13. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  14. 40 CFR 35.937-12 - Subcontracts under subagreements for architectural or engineering services.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... architectural or engineering services. 35.937-12 Section 35.937-12 Protection of Environment ENVIRONMENTAL... engineering services. (a) Neither award and execution of subcontracts under a prime contract for architectural or engineering services, nor the procurement and negotiation procedures used by the engineer in...

  15. 48 CFR 49.108-8 - Assignment of rights under subcontracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Assignment of rights under subcontracts. 49.108-8 Section 49.108-8 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 49.108-8 Assignment of rights under...

  16. 48 CFR 1449.107 - Audit of prime contract settlement proposals and subcontract settlements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Audit of prime contract settlement proposals and subcontract settlements. 1449.107 Section 1449.107 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT TERMINATION OF CONTRACTS General Principles 1449...

  17. 48 CFR 44.400 - Scope of subpart.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SUBCONTRACTING POLICIES AND PROCEDURES Subcontracts for Commercial Items and Commercial Components 44.400 Scope... required to apply to any subcontractors that are furnishing commercial items or commercial components in accordance with Section 8002(b)(2) of Public Law 103-355 and Section 826 of Public Law 110-181 (10 U.S.C...

  18. 48 CFR 252.219-7003 - Small business subcontracting plan (DoD contracts).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7003 Small business subcontracting plan (DoD contracts). As prescribed in 219.708(b)(1)(A), use the following clause: Small Business...

  19. 77 FR 44047 - Federal Acquisition Regulation; Reporting Executive Compensation and First-Tier Subcontract Awards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-26

    ... Compensation B. Definitions C. Thresholds D. Paperwork Burden E. Applicability F. Subcontract Award Data G... definition of ``first- tier subcontractor.'' Comment: A number of respondents believed that executive... technologies and ideas, and increase the Government's costs by reducing competition. These respondents also...

  20. 77 FR 56709 - Proposed Information Collection (VA Subcontracting Report for Service Disabled Veteran-Owned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ..., Federal agencies are required to publish notice in the Federal Register concerning each proposed... response to the notice. This notice solicits comments on information needed to collect information from subcontractors to compare information obtained from subcontracting plans submitted by prime contractors in order...

  1. 25 CFR 900.136 - Do tribal employment rights ordinances apply to construction contracts and subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Do tribal employment rights ordinances apply to... OF THE INTERIOR, AND INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER... rights ordinances apply to construction contracts and subcontracts? Yes. Tribal employment rights...

  2. 48 CFR 752.226-2 - Subcontracting with disadvantaged enterprises.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management and daily business are controlled by one or more such individuals. (2) Owned by socially and... disadvantaged enterprises. 752.226-2 Section 752.226-2 Federal Acquisition Regulations System AGENCY FOR... Clauses 752.226-2 Subcontracting with disadvantaged enterprises. As prescribed in 726.7007, insert the...

  3. 48 CFR 52.215-23 - Limitations on Pass-Through Charges.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... indirect costs and associated profit/fee based on such costs). No or negligible value means the Contractor... value means that the Contractor performs subcontract management functions that the Contracting Officer... Contractor or subcontractor that adds no or negligible value to a contract or subcontract, means a charge to...

  4. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  5. 48 CFR 252.219-7004 - Small business subcontracting plan (test program).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Small business... AND CONTRACT CLAUSES Text of Provisions And Clauses 252.219-7004 Small business subcontracting plan (test program). As prescribed in 219.708(b)(1)(B), use the following clause: Small Business...

  6. 48 CFR 52.209-6 - Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Protecting the Government....209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. As prescribed in 9.409, insert the following clause: Protecting the...

  7. Research on polycrystalline thin film submodules based on CuInSe{sub 2} materials. Annual subcontract report, 11 November 1990--31 October 1991

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Catalano, A.; Arya, R.; Carr, L.

    1992-05-01

    This report describes progress during the first year of a three-year research program to develop 12%-efficient CuInSe{sub 2} (CIS) submodules with area greater than 900 cm{sup 2}. To meet this objective, the program was divided into five tasks: (1) windows, contacts, substrates; (2) absorber material; (3) device structure; (4) submodule design and encapsulation; and (5) process optimization. In the first year of the program, work was concentrated on the first three tasks with an objective to demonstrate a 9%-efficient CIS solar cell. 7 refs.

  8. FY2013 Progress Report for Fuel & Lubricant Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2014-02-01

    Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.

  9. FY2014 Fuel & Lubricant Technologies Annual Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stork, Kevin

    2016-02-01

    Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.

  10. Energy Policy Act of 1992 : limited progress in acquiring alternative fuel vehicles and reaching fuel goals

    DOT National Transportation Integrated Search

    2000-02-01

    Since the passage of the Energy Policy Act of 1992, some, albeit limited, progress has been made in acquiring alternative fuel vehicles and reducing the consumption of petroleum fuels in transportation. DOE estimates about 1 million alternative fuel ...

  11. Archived Appendices | NREL

    Science.gov Websites

    subcontract or NREL Procurement. Appendix B-1 (07/11/14) Standard Terms and Conditions for (1) Cost Sharing , (2) Cost Reimbursement, and (3) Cost Plus Fixed Fee. Appendix B-2 (07/11/14) Standard Terms and Conditions for Cost Type Subcontracts with Educational Institutions Appendix B-10 (07/11/14) Standard Terms

  12. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  13. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  14. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  15. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  16. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  17. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  18. 48 CFR 1852.219-80 - Limitation on subcontracting-SBIR Phase I program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracting-SBIR Phase I program. 1852.219-80 Section 1852.219-80 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-80 Limitation on subcontracting—SBIR Phase I program. As prescribed in 1819.7302(a), insert the following clause: Limitation on Subcontracting—SBIR Phase I Program...

  19. 48 CFR 1852.219-81 - Limitation on subcontracting-SBIR Phase II program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... subcontracting-SBIR Phase II program. 1852.219-81 Section 1852.219-81 Federal Acquisition Regulations System... CLAUSES Texts of Provisions and Clauses 1852.219-81 Limitation on subcontracting—SBIR Phase II program. As prescribed in 1819.7302(b), insert the following clause: Limitation on Subcontracting—SBIR Phase II Program...

  20. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  1. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  2. 26 CFR 1.1471-1 - Recovery of excessive profits on government contracts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... determining the true total contract price of such contract or subcontract. § 16.8 Cost of performing a... subcontract, as for instance, payments of royalties and amortization of the cost of designs purchased and patent rights over their useful life; and “deferred” or “unliquidated” experimental and development...

  3. 13 CFR 121.411 - What are the size procedures for SBA's Section 8(d) Subcontracting Program?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false What are the size procedures for SBA's Section 8(d) Subcontracting Program? 121.411 Section 121.411 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and Standards...

  4. 48 CFR 52.232-27 - Prompt payment for construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the... include such clauses in their subcontracts with each lower-tier subcontractor or supplier. (d) Subcontract... impair the right of the Contractor or a subcontractor at any tier to negotiate, and to include in their...

  5. 31 CFR 537.410 - Contracts and subcontracts regarding economic development of resources in Burma.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... supervision and guarantee at the highest level of project management, such as entry into a contract with a development project's sponsor or owner to become a prime contractor or general manager for a development project; (b) Entry into subcontracts where the functional scope of the subcontractor's obligations is...

  6. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  7. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  8. 48 CFR 19.1308 - Performance of work requirements (limitations on subcontracting) for general construction or...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Performance of work requirements (limitations on subcontracting) for general construction or construction by special trade contractors. 19.1308 Section 19.1308 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAM...

  9. Bureaucratic versus Craft Administration: The Relationship of Market Structure to the Construction Firm.

    ERIC Educational Resources Information Center

    Eccles, Robert G.

    1981-01-01

    Examines the factors that influence subcontracting and type of management in the construction industry. Argues that subcontracting is explained by a construction firm's size, complexity, and market extent, and that management type results from a firm's size and role in the production process and from census classification problems. (Author/RW)

  10. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  11. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  12. 48 CFR 52.230-6 - Administration of Cost Accounting Standards.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... following clause: Administration of Cost Accounting Standards (JUN 2010) For the purpose of administering... cost accounting practice that a Contractor is required to make in order to comply with applicable... subcontract(s) elects to make that has not been deemed a desirable change by the CFAO and for which the...

  13. 48 CFR 19.707 - The Small Business Administration's role in carrying out the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Administration's role in carrying out the program. 19.707 Section 19.707 Federal Acquisition Regulations System... Subcontracting Program 19.707 The Small Business Administration's role in carrying out the program. (a) Under the... nature; and (4) Evaluate compliance with subcontracting plans, either on a contract-by-contract basis, or...

  14. 77 FR 70210 - Agency Information Collection (VA Subcontracting Report for Service Disabled Veteran-owned Small...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... Subcontracting Report for Service Disabled Veteran-owned Small Business and Veteran-owned Small Business Concerns) Activities Under OMB Review AGENCY: Office of Small and Disadvantaged Business Utilization, Department of... U.S.C. 3501-3521), this notice announces that the Office of Small and Disadvantaged Business...

  15. The Photovolatic Manufacturing Technology project (PVMaT) after three years

    NASA Astrophysics Data System (ADS)

    Witt, C. Edwin; Mitchell, Richard L.; Thomas, Holly; Herwig, Lloyd O.

    1994-08-01

    The Photovoltaic Manufacturing Technology project (PVMaT) is a government/industry research and development (R&D) partnership involving joint efforts between the federal government (through the US Department of Energy (DOE)) and members of the US photovoltaic (PV) industry. The project's goal is to assist US industry in retaining and extending its world leadership role in the manufacture and commercial development of PV components and systems. PVMaT is being carried out in three separate phases, each designed to address separate R&D requirements for achieving PVMaT goals. Phase 1 was a problem identification phase of about 3 months duration. In Phase 1, the status and needs of the US PV manufacturing industry were identified, and the development of a Phase 2 procurement responsive to the industry's needs was begun. Phase 1 was completed in 1991. Problem solution began in 1992, under Phase 2A, when DOE awarded multiyear subcontracts. Technical accomplishments for PVMaT 2A are presented in this paper. Subcontracts were recently awarded for a second, overlapping, and similar process-specific solicitation (PVMaT 2B). The activities of these new subcontracts are also described. Two subcontracts presently comprise the Phase 3 effort. Phase 3 addresses R&D problems that are relatively common to a number of PV companies or the PV industry as a whole. A teamed research approach is being used to improve automated module manufacturing lines and encapsulation materials used in module manufacturing. The first year's work on these subcontracts is also described in this paper.

  16. Gas-Cooled Reactor Programs annual progress report for period ending December 31, 1973. [HTGR fuel reprocessing, fuel fabrication, fuel irradiation, core materials, and fission product distribution; GCFR fuel irradiation and steam generator modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kasten, P.R.; Coobs, J.H.; Lotts, A.L.

    1976-04-01

    Progress is summarized in studies relating to HTGR fuel reprocessing, refabrication, and recycle; HTGR fuel materials development and performance testing; HTGR PCRV development; HTGR materials investigations; HTGR fuel chemistry; HTGR safety studies; and GCFR irradiation experiments and steam generator modeling.

  17. ASRM test report: Autoclave cure process development

    NASA Technical Reports Server (NTRS)

    Nachbar, D. L.; Mitchell, Suzanne

    1992-01-01

    ASRM insulated segments will be autoclave cured following insulation pre-form installation and strip wind operations. Following competitive bidding, Aerojet ASRM Division (AAD) Purchase Order 100142 was awarded to American Fuel Cell and Coated Fabrics Company, Inc. (Amfuel), Magnolia, AR, for subcontracted insulation autoclave cure process development. Autoclave cure process development test requirements were included in Task 3 of TM05514, Manufacturing Process Development Specification for Integrated Insulation Characterization and Stripwind Process Development. The test objective was to establish autoclave cure process parameters for ASRM insulated segments. Six tasks were completed to: (1) evaluate cure parameters that control acceptable vulcanization of ASRM Kevlar-filled EPDM insulation material; (2) identify first and second order impact parameters on the autoclave cure process; and (3) evaluate insulation material flow-out characteristics to support pre-form configuration design.

  18. Fuel Cell Power Plant Initiative. Volume 2; Preliminary Design of a Fixed-Base LFP/SOFC Power System

    NASA Technical Reports Server (NTRS)

    Veyo, S.E.

    1997-01-01

    This report documents the preliminary design for a military fixed-base power system of 3 MWe nominal capacity using Westinghouse's tubular Solid Oxide Fuel Cell [SOFC] and Haldor Topsoe's logistic fuels processor [LFP]. The LFP provides to the fuel cell a methane rich sulfur free fuel stream derived from either DF-2 diesel fuel, or JP-8 turbine fuel. Fuel cells are electrochemical devices that directly convert the chemical energy contained in fuels such as hydrogen, natural gas, or coal gas into electricity at high efficiency with no intermediate heat engine or dynamo. The SOFC is distinguished from other fuel cell types by its solid state ceramic structure and its high operating temperature, nominally 1000'C. The SOFC pioneered by Westinghouse has a tubular geometry closed at one end. A power generation stack is formed by aggregating many cells in an ordered array. The Westinghouse stack design is distinguished from other fuel cell stacks by the complete absence of high integrity seals between cell elements, cells, and between stack and manifolds. Further, the reformer for natural gas [predominantly methane] and the stack are thermally and hydraulically integrated with no requirement for process water. The technical viability of combining the tubular SOFC and a logistic fuels processor was demonstrated at 27 kWe scale in a test program sponsored by the Advanced Research Projects Agency [ARPA) and carried out at the Southern California Edison's [SCE] Highgrove generating station near San Bernardino, California in 1994/95. The LFP was a breadboard design supplied by Haldor Topsoe, Inc. under subcontract to Westinghouse. The test program was completely successful. The LFP fueled the SOFC for 766 hours on JP-8 and 1555 hours of DF-2. In addition, the fuel cell operated for 3261 hours on pipeline natural gas. Over the 5582 hours of operation, the SOFC generated 118 MVVH of electricity with no perceptible degradation in performance. The LFP processed military specification JP-8 and DF-2 removing the sulfur and reforming these liquid fuels to a methane rich gaseous fuel. Results of this program are documented in a companion report titled 'Final Report-Solid Oxide Fuel Cell/ Logistic Fuels Processor 27 kWe Power System'.

  19. 48 CFR 52.215-22 - Limitations on Pass-Through Charges-Identification of Subcontract Effort.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The offeror's proposal shall exclude excessive pass-through charges. (c) Performance of work by the..., under the contract, task order, or delivery order. (2) If the offeror intends to subcontract more than 70 percent of the total cost of work to be performed under the contract, task order, or delivery...

  20. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  1. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  2. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  3. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  4. 40 CFR 33.304 - Must a Native American (either as an individual, organization, Tribe or Tribal Government...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with existing Tribal or Federal law, including but not limited to the Indian Self-Determination and..., subcontract, grant, or subgrant awarded to Indian organizations or for the benefit of Indians, shall require preference in the award of subcontracts and subgrants to Indian organizations and to Indian-owned economic...

  5. 13 CFR 125.3 - What types of subcontracting assistance are available to small businesses?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... controlled by women. The subcontracting assistance program implements section 8(d) of the Small Business Act... percentage of total contract dollars. (3) A prime contractor has a history of unjustified untimely or reduced... disadvantaged business, or women-owned small business; and (ix) As a best practice, the contractor may provide...

  6. 48 CFR 13.005 - List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false List of laws inapplicable to contracts and subcontracts at or below the simplified acquisition threshold. 13.005 Section 13.005 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES SIMPLIFIED ACQUISITION PROCEDURES...

  7. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  8. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  9. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  10. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Participant is small for a particular 8(a) BD subcontract? 121.603 Section 121.603 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION SMALL BUSINESS SIZE REGULATIONS Size Eligibility Provisions and... Participant. A 8(a) BD Participant must certify that it qualifies as a small business under the NAICS code...

  11. Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Troy Carter

    2011-04-18

    The final 'phaseout' year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfven waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of the Winter School).« less

  12. NREL photovoltaic program FY 1997 annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McConnell, R.D.; Hansen, A.; Smoller, S.

    1998-06-01

    This report summarizes the in-house and subcontracted research and development (R and D) activities under the NREL PV Program from October 1, 1996, through September 30, 1997 (FY 1997). The NREL PV Program is part of the US Department of Energy`s (DOE`s) National Photovoltaics Program, as described in the DOE National Photovoltaics Program Plan for 1996--2000. The FY 1997 budget authority for carrying out the NREL PV Program was $39.3 million in operating funds and $0.4 million in capital equipment funds. Subcontract activities represent a major part of the NREL PV Program, with $21.8 million (55% of PV funds) goingmore » to some 84 subcontractors. Cost sharing by industry added almost $8.8 million to the subcontract R and D activities with industry.« less

  13. 2 CFR 1326.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1326.220 Section 1326.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  14. 2 CFR 1200.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1200.220 Section 1200.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? In addition to the contracts covered under 2...

  15. Brentwood Lessons Learned Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rivkin, Carl H.; Caton, Melanie C.; Ainscough, Christopher D.

    The purpose of this report is to document lessons learned in the installation of the hydrogen fueling station at the National Park Service Brentwood site in Washington, D.C., to help further the deployment of hydrogen infrastructure required to support hydrogen and other fuel cell technologies. Hydrogen fueling is the most difficult infrastructure component to build and permit. Hydrogen fueling can include augmenting hydrogen fueling capability to existing conventional fuel fueling stations as well as building brand new hydrogen fueling stations. This report was produced as part of the Brentwood Lessons Learned project. The project consisted of transplanting an existing modularmore » hydrogen fueling station from Connecticut to the National Park Service Brentwood site. This relocation required design and construction at the Brentwood site to accommodate the existing station design as well as installation and validation of the updated station. One of the most important lessons learned was that simply moving an existing modular station to an operating site was not necessarily straight-forward - performing the relocation required significant effort and cost. The station has to function at the selected operating site and this functionality requires a power supply, building supports connecting to an existing alarm system, electrical grounding and lighting, providing nitrogen for purging, and providing deionized water if an electrolyzer is part of the station package. Most importantly, the station has to fit into the existing site both spatially and operationally and not disrupt existing operations at the site. All of this coordination and integration requires logistical planning and project management. The idea that a hydrogen fueling station can be simply dropped onto a site and made immediately operational is generally not realistic. Other important lessons learned include that delineating the boundaries of the multiple jurisdictions that have authority over a project for all parties involved in the project are key to an efficient approval process; and site investigation is necessary when integrating a new station design onto an existing site, particularly an older existing site that may have limited documentation on the site history and operations. The lessons learned for permitting and subcontracting construction work can be applied to other similar sites and to commercial sites.« less

  16. 630A MARITIME NUCLEAR STEAM GENERATOR. Progress Report No. 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1962-07-31

    Work on the 630A Maritime Nuclear Steam Generator Scoping Study is summarized. The objective of the program is to establish a specific 630A configuration and to develop specifications for components and test equipment. During the period, work was initiated in critical experiment design and fabrication, additional fuel and materials investigations, boiler-test design and fabrication; blower studies; design of component tests; nuclear, thermodynamic, mechanical and safety analysis, and test facility and equipment studies. Design of the critical experiment mockup and test equipment was completed and fabrication of the parts is approximately 50% complete. A rough draft of the critical experiment hazardsmore » report was completed. A fuel test in the ORR completed 876.5 hr of testing out of a planned 2200-hr test without indication of failure. The burnup was equivalent to about 6000 hr of 630A operation. Damage to the capsule during refueling of the ORR caused termination of the test. The design of an MTR fuel-burnup test was completed and fabrication of the sample initiated. Ni-Cr fuel sheet and cladding stock are being tested for creep and oxidation properties at temperatures up to 1750 deg F and have accumulated times up to 5000 hr; no failures have occurred. These tests are continuing. Specimens of Ni-Cr were fabricated and will be tested to determine the effect of neutron irradiation. Cycle operating conditions with 120O deg F reactor-discharge-air temperature were studied and found to be acceptable for the proposed maritime application. Increases in cycle efficiency above 30.2% appear to be possible and practical. Studies during the period indicate that an acceptable power distribution can be maintained through the life of the reactor and the maximum hot spot temperature and maximum burnup location would not coincide. Specifications for the fuel loading of the critical experiment are being prepared. Study of the pressure vessel resulted in selection of 304 SS. Containment studies indfcated the practicality of designing the shield tank outer shell as part of the containment vessel. A blower scoping study subcontract was completed. The study verified the feasibility of the main and afterblower concept. Alternate shaft-seal designs were proposed. The design of a performance test for the two seal types has been initiated. The design of the boiler test from which control characteristics will be determined was completed and fabrication started. The decision was made that the Low Power Test Facility (LPTF) will be the site used for the critical experiment. A preliminary study of the power test facility requirements were completed. The study indicated that locating the facility adjacent to the LPTF would be operationally and economically feasible. (auth)« less

  17. CONSTRUCTION PROGRESS PHOTO SHOWING WEST STORAGE BASIN AT FUEL STORAGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING WEST STORAGE BASIN AT FUEL STORAGE BUILDING (CPP-603). INL PHOTO NUMBER NRTS-51-689. Unknown Photographer, 1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  18. CONSTRUCTION PROGRESS PHOTO SHOWING FUEL STORAGE BUILDING (CPP603) LOOKING NORTHWEST. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING FUEL STORAGE BUILDING (CPP-603) LOOKING NORTHWEST. INL PHOTO NUMBER NRTS-50-895. Unknown Photographer, 10/30/1950 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  19. An Industrial-Based Consortium to Develop Premium Carbon Products from Coal, Annual Progress Report, October 1, 2005 through September 30, 2006

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, Bruce G

    2006-09-29

    Since 1998, The Pennsylvania State University has been successfully managing the Consortium for Premium Carbon Products from Coal (CPCPC), which is a vehicle for industry-driven research on the promotion, development, and transfer of innovative technology on premium carbon produces from coal to the U.S. industry. The CPCPC is an initiative being led by Penn State, its co-charter member West Virginia University (WVU), and the U.S. Department of Energy's (DOE) National Energy Technology Laboratory (NETL), who also provides the base funding for the program, with Penn State responsible for consortium management. CPCPC began in 1998 under DOE Cooperative Agreement No. DE-FC26-98FT40350.more » This agreement ended November 2004 but the CPCPC activity has continued under the present cooperative agreement, No. DE-FC26-03NT41874, which started October 1, 2003. The objective of the second agreement is to continue the successful operation of the CPCPC. The CPCPC has enjoyed tremendous success with its organizational structure, that includes Penn State and WVU as charter members, numerous industrial affiliate members, and strategic university affiliate members together with NETL, forming a vibrant and creative team for innovative research in the area of transforming coal to carbon products. The key aspect of CPCPC is its industry-led council that selects proposals submitted by CPCPC members to ensure CPCPC target areas have strong industrial support. Base funding for the selected projects is provided by NETL with matching funds from industry. At the annual funding meeting held in October 2003, ten projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2004. Nine of the ten 2004 projects were completed during the previous annual reporting period and their final reports were submitted with the previous annual report (i.e., 10/01/04-09/30/05). The final report for the remaining project, which was submitted during this reporting period (i.e., 10/01/05-09/30/06), is attached. At the annual funding meeting held in November 2004, eleven projects were selected for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2005. Three additional projects were selected for funding during the April 2005 tutorial/funding meeting. Subcontracts were let from Penn State to the subcontractors on July 1, 2005. Of these fourteen 2005 projects, eleven have been completed and the final reports are attached. An annual funding meeting was held in November 2005 and the council selected five projects for funding. Subcontracts were let from Penn State to the subcontractors on March 1, 2006, except for one that started October 1, 2006.« less

  20. 2 CFR 1125.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1125.220 Section 1125.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  1. 2 CFR 1400.220 - What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 2 Grants and Agreements 1 2011-01-01 2011-01-01 false What contracts and subcontracts, in addition to those listed in 2 CFR 180.220, are covered transactions? 1400.220 Section 1400.220 Grants and... those listed in 2 CFR 180.220, are covered transactions? Although the OMB guidance at 2 CFR 180.220(c...

  2. 13 CFR 121.603 - How does SBA determine whether a Participant is small for a particular 8(a) BD subcontract?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... determine whether a Participant is small for a particular 8(a) BD subcontract? (a) Self certification by... agency. The Participant also must submit a copy of its offer, including its self-certification as to size... nonmanufacturer rule to, 8(a) BD procurements. (b) Verification of size by SBA. Within 30 days of its receipt of a...

  3. Evaluation of Subcontract Price Proposals

    DTIC Science & Technology

    1990-04-09

    This is the final report on the Audit of the Evaluation of Subcontract Price Proposals. Comments on a draft of this report were considered in...preparing the final report. We made the audit from October 1987 through May 198% The initial objectives of the audit were to evaluate procedures used by...assist audit reports were used by procurement contracting officers in negotiating contract prices. During the audit , we expanded our objectives to

  4. Under pressure, out of control, or home alone? Reviewing research and policy debates on the occupational health and safety effects of outsourcing and home-based work.

    PubMed

    Quinlan, Michael; Bohle, Philip

    2008-01-01

    The practice of outsourcing or subcontracting of work has grown rapidly in most countries over the past two decades. Outsourcing, de-institutionalization, and a range of other practices have also resulted in a growth of home-based work. Home-based workers, even when not part of a subcontracting process, operate in an isolated situation remote from their employer and other workers. Do such work arrangements expose workers to greater risk of injury, illness, or assault? The authors reviewed international studies of the occupational health and safety (OHS) effects of subcontracting and home-based work undertaken over the past 20 years. Of the 25 studies analyzed, 92 percent found poorer OHS outcomes. The studies were examined for clues about the reasons for these negative outcomes. The authors also identified similarities and differences between subcontracting and home-based work. Despite the evidence of poor OHS outcomes, research into outsourcing has stalled in recent years. With notable exceptions, governments have taken little account of findings on these work arrangements in their laws and policies, in part because neoliberal ideas dominate national and global policy agendas. The authors examine policy challenges and regulatory responses and make suggestions for future research and policy interventions.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frame, E.A.

    The objectives of this project were: (1) to determine the feasibility of adding a vapor-phase corrosion inhibitor (VCI) component to improve the preservation performance of MIL-L-21260 and (2) to evaluate a less complicated engine preservation procedure. A simultaneous two-phase approach was conducted. Phase 1 involved the formulation and evaluation of experimental VCI oils, while Phase 2 was the evaluation of a simplified engine preservation procedure. VCI oil formulation was conducted by Ronco Laboratory under subcontract. Compatibility of the experimental VCI oils with metal coupons, elastomers, and fuel filters was determined. Effectiveness of the experimental VCI oil was evaluated in amore » 3-year outdoor engine storage test. The engines were preserved using an experimental, simplified preservation procedure. The simplified engine preservation procedure proved to be acceptable as engines stored for 3 years in a very severe environment were judged to have been adequately preserved. Engine oil meeting specification MIL-L-21260 provided satisfactory protection during the 3-year storage test. The experimental VCI oil also provided satisfactory storage protection during this test; however, there was no observable advantage for the VCI oil. The VCI oil had acceptable compatibility with an elastomeric flex ring, metal coupons (except lead), and fuel filters.« less

  6. Industrial Fuel Gas Demonstration Plant Program. Bid packages for materials (Deliverable No. 28)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-01-01

    Fixed-price supply type bid packages for materials and/or service essentially are comprised of two parts, namely: (1) a technical requisition of the material, equipment, or service to be supplied; and (2) commercial and legal requirements, normally referred to as terms and conditions. Requisitions, providing technical requirements, for all equipment items identified for the Industrial Fuel Gas Demonstration Plant may be found in the 12 volumes of the Demonstration Plant Mechanical Design. The requisitions have been included within separate sections of the design report, sorted by appropriate plant unit. Combined with any General Notes Requisition and the necessary FWEC Job Standards,more » these various item requisitions provide all technical information for the prospective vendor to furnish his bid. The terms and conditions (boiler plate) to be included in the bid package identify all the contractual requirements which will be imposed upon the bidder. These requirements cover the conditions he must meet to bid on the particular item as well as the clauses to be included within the eventual purchase order/subcontract. A typical package of such terms and conditions is included.« less

  7. CONSTRUCTION PROGRESS PHOTO SHOWING EMPLACEMENT STEEL BEAMS FUEL STORAGE BUILDING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    CONSTRUCTION PROGRESS PHOTO SHOWING EMPLACEMENT STEEL BEAMS FUEL STORAGE BUILDING (CPP-603) LOOKING EAST. INL PHOTO NUMBER NRTS-51-1371. Unknown Photographer, 1/31/1951 - Idaho National Engineering Laboratory, Idaho Chemical Processing Plant, Fuel Reprocessing Complex, Scoville, Butte County, ID

  8. 3 CFR - Improving Energy Security, American Competitiveness and Job Creation, and Environmental...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... source of fossil fuel consumption and greenhouse gas pollution. I therefore request that the... annual progress in reducing transportation sector emissions and fossil fuel consumption consistent with... substantial annual progress in reducing transportation sector greenhouse gas emissions and fossil fuel...

  9. Poor Government Oversight of Anham and Its Subcontracting Procedures Allowed Questionable Costs To Go Undetected

    DTIC Science & Technology

    2011-07-30

    contractor purchasing system review of Anham. Management Comments and Audit Response The Defense Contract Mangement Agency and the U.S. Central... Introduction 1  Background 1  Government Agency Roles and Oversight Responsibilities 4  Objectives 7  Weak Government Oversight Resulted in Significant...Subcontracting Procedures Allowed Questionable Costs To Go Undetected SIGIR 11-022 July 30, 2011 Introduction Since 2003, the United States Government

  10. Center for Multiscale Plasma Dynamics: Report on Activities (UCLA/MIT), 2009-2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, Troy Alan

    2014-10-03

    The final “phaseout” year of the CMPD ended July 2010; a no cost extension was requested until May 2011 in order to enable the MIT subcontract funds to be fully utilized. Research progress over this time included verification and validation activities for the BOUT and BOUT++ code, studies of spontaneous reconnection in the VTF facility at MIT, and studies of the interaction between Alfv´en waves and drift waves in LAPD. The CMPD also hosted the 6th plasma physics winter school in 2010 (jointly with the NSF frontier center the Center for Magnetic Self-Organization, significant funding came from NSF for thismore » most recent iteration of theWinter School).« less

  11. LDRD 2013 Annual Report: Laboratory Directed Research and Development Program Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bookless, W.

    This LDRD project establishes a research program led by Jingguang Chen, who has started a new position as a Joint Appointee between BNL and Columbia University as of FY2013. Under this project, Dr. Chen will establish a new program in catalysis science at BNL and Columbia University. The LDRD program will provide initial research funding to start research at both BNL and Columbia. At BNL, Dr. Chen will initiate laboratory research, including hiring research staff, and will collaborate with the existing BNL catalysis and electrocatalysis research groups. At Columbia, a subcontract to Dr. Chen will provide startup funding for hismore » laboratory research, including initial graduate student costs. The research efforts will be linked under a common Catalysis Program in Sustainable Fuels. The overall impact of this project will be to strengthen the BNL catalysis science program through new linked research thrusts and the addition of an internationally distinguished catalysis scientist.« less

  12. 2015 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2015 Annual Progress Report summarizes fiscal year 2015 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; and market transformation.

  13. 2016 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2016 Annual Progress Report summarizes fiscal year 2016 activities and accomplishments by projects funded by the DOE Hydrogen and Fuel Cells Program. It covers the program areas of hydrogen production; hydrogen delivery; hydrogen storage; fuel cells; manufacturing R&D; technology validation; safety, codes and standards; systems analysis; market transformation; and Small Business Innovation Research projects.

  14. Co-Optimization of Fuels & Engines (Co-Optima) Initiative: Recent Progress on Light-Duty Boosted Spark-Ignition Fuels/Engines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farrell, John

    This presentation reports recent progress on light-duty boosted spark-ignition fuels/engines being developed under the Co-Optimization of Fuels and Engines initiative (Co-Optima). Co-Optima is focused on identifying fuel properties that optimize engine performance, independent of composition, allowing the market to define the best means to blend and provide these fuels. However, in support of this, we are pursuing a systematic study of blendstocks to identify a broad range of feasible options, with the objective of identifying blendstocks that can provide target ranges of key fuel properties, identifying trade-offs on consistent and comprehensive basis, and sharing information with stakeholders.

  15. Recent Progress in Nanostructured Electrocatalysts for PEM Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Sheng; Shao, Yuyan; Yin, Geping

    2013-03-30

    Polymer electrolyte membrane (PEM) fuel cells are attracting much attention as promising clean power sources and an alternative to conventional internal combustion engines, secondary batteries, and other power sources. Much effort from government laboratories, industry, and academia has been devoted to developing PEM fuel cells, and great advances have been achieved. Although prototype cars powered by fuel cells have been delivered, successful commercialization requires fuel cell electrocatalysts, which are crucial components at the heart of fuel cells, meet exacting performance targets. In this review, we present a brief overview of the recent progress in fuel cell electrocatalysts, which involves catalystmore » supports, Pt and Pt-based electrocatalysts, and non-Pt electrocatalysts.« less

  16. FY 2005 Annual Progress Report for the DOE Hydrogen Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    In cooperation with industry, academia, national laboratories, and other government agencies, the Department of Energy's Hydrogen Program is advancing the state of hydrogen and fuel cell technologies in support of the President's Hydrogen Fuel Initiative. The initiative seeks to develop hydrogen, fuel cell, and infrastructure technologies needed to make it practical and cost-effective for Americans to choose to use fuel cell vehicles by 2020. Significant progress was made in fiscal year 2005 toward that goal.

  17. The AGTSR consortium: An update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fant, D.B.; Golan, L.P.

    1995-10-01

    The Advanced Gas Turbine Systems Research (AGTSR) program is a collaborative University-Industry R&D Consortium that is managed and administered by the South Carolina Energy R&D Center. AGTSR is a nationwide consortium dedicated to advancing land-based gas turbine systems for improving future power generation capability. It directly supports the technology-research arm of the ATS program and targets industry-defined research needs in the areas of combustion, heat transfer, materials, aerodynamics, controls, alternative fuels, and advanced cycles. The consortium is organized to enhance U.S. competitiveness through close collaboration with universities, government, and industry at the R&D level. AGTSR is just finishing its thirdmore » year of operation and is sponsored by the U.S. DOE - Morgantown Energy Technology Center. The program is scheduled to continue past the year 2000. At present, there are 78 performing member universities representing 36 states, and six cost-sharing U.S. gas turbine corporations. Three RFP`s have been announced and the fourth RFP is expected to be released in December, 1995. There are 31 research subcontracts underway at performing member universities. AGTSR has also organized three workshops, two in combustion and one in heat transfer. A materials workshop is in planning and is scheduled for February, 1996. An industrial internship program was initiated this past summer, with one intern positioned at each of the sponsoring companies. The AGTSR consortium nurtures close industry-university-government collaboration to enhance synergism and the transition of research results, accelerate and promote evolutionary-revolutionary R&D, and strives to keep a prominent U.S. industry strong and on top well into the 21st century. This paper will present the objectives and benefits of the AGTSR program, progress achieved to date, and future planned activity in fiscal year 1996.« less

  18. High-throughput manufacturing of thin-film CdS/CdTe photovoltaic modules. Annual subcontract report, 16 November 1994--15 November 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D.W.

    1997-02-01

    The objectives of this subcontract are to advance Solar Cells, Inc.`s (SCI`s) photovoltaic manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. Activities during the second year of the program concentrated on process development, equipment design and testing, quality assurance, and ES and H programs. These efforts broadly addressed the issues of the manufacturing process for producing thin-film monolithic CdS/CdTe photovoltaic modules.

  19. Improved Transparent Conducting Oxides for Photovoltaics: Final Research Report, 1 May 1999--31 December 2002

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mason, T. O.; Chang, R. P. H.; Marks, T. J.

    2003-10-01

    This subcontract focused on next-generation transparent conducting oxides (TCOs) for improved PV performance. More specifically, there were two research foci: (1) improved Sn-based, n-type TCOs aimed at enhanced CdTe PV cell performance, and (2) novel Cu-based, p-type TCOs applicable to a variety of PV designs. The objective of the research under this subcontract was to identify, explore, evaluate, and develop future generations of photovoltaic technologies that can meet the long-term goal of producing low-cost electricity from sunlight.

  20. [Progress and prospect of bio-jet fuels industry in domestic and overseas].

    PubMed

    Qiao, Kai; Fu, Jie; Zhou, Feng; Ma, Huixia

    2016-10-25

    We reviewed the progress of the bio-jet fuels industry in recent years and systematically analyzed the technical routes that have been approved or in the pipeline for approval by ASTM D7566. In addition, we highlighted a novel pathway to produce drop-in fuel by near-critical hydrolysis of waste cooking oils or algal oils followed by catalytic decarboxylation. Also, we introduced the source of oils and fats feedstock and the domestic bio-jet fuel industry status during the 12th Five-Year-Plan period. Based on our own research, we discussed the prospect of the bio-jet fuel industry and future research needs.

  1. Operating results and reinjection of Milos field in Greece

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hibara, Y.; Tahara, M.; Sakanashi, H.

    1989-01-01

    The Milos geothermal prospect located on one of the Cycladean islands of Greece represents a high temperature (320{sup 0}C), high silica content (1150 ppm) modified sea water resource. The program of development under taken by the Public Power Corporation (PPC) of Greece started with the drilling of a number of wells and has progressed to the installation of a pilot-style 2MW(e) condensing power plant which went on-line in December 1986. This plant has been provided by Mitsubishi Heavy Industries (MHI) under a contract with PPC. Geothermal South Pacific (GEOSPAC) was sub-contracted to MHI to provide technical and scientific assistance inmore » connection with reservoir related matters. The authors present the various studies and modification that were done to establish an acceptable method of plant operation and waste disposal.« less

  2. 2014 Annual Progress Report: DOE Hydrogen and Fuel Cells Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2014-11-01

    The 2014 Annual Progress Report summarizes fiscal year 2014 activities and accomplishments by projects funded by the DOE Hydrogen Program. It covers the program areas of hydrogen production and delivery; hydrogen storage; fuel cells; manufacturing; technology validation; safety, codes and standards; market transformation; and systems analysis.

  3. High Throughput Manufacturing of Thin-Film CdTe Photovoltaic Materials; Final Subcontract Report, 16 November 1993-31 December 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D. W.

    1999-09-02

    This report describes work performed by Solar Cells, Inc. (SCI), during this Photovoltaic Manufacturing Technology (PVMaT) subcontract. Cadmium telluride (CdTe) is recognized as one of the leading materials for low-cost photovoltaic modules. SCI has developed this technology and is preparing to scale its pilot production capabilities to a multi-megawatt level. This four-phase PVMaT subcontract supports these efforts. The work was related to product definition, process definition, equipment engineering, and support programs development. In the area of product definition and demonstration, two products were specified and demonstrated-a grid-connected, frameless, high-voltage product that incorporates a pigtail potting design and a remote low-voltagemore » product that may be framed and may incorporate a junction box. SCI produced a 60.3-W thin-film CdTe module with total-area efficiency of 8.4%; SCI also improved module pass rate on the interim qualification test protocol from less than 20% to 100% as a result of work related to the subcontract. In the manufacturing process definition area, the multi-megawatt manufacturing process was defined, several of the key processes were demonstrated, and the process was refined and proven on a 100-kW pilot line that now operates as a 250-kW line. In the area of multi-megawatt manufacturing-line conceptual design review, SCI completed a conceptual layout of the multi-megawatt lines. The layout models the manufacturing line and predicts manufacturing costs. SCI projected an optimized capacity, two-shift/day operation of greater than 25 MW at a manufacturing cost of below $1.00/W.« less

  4. Gas-turbine critical research and advanced technology support project

    NASA Technical Reports Server (NTRS)

    Clark, J. S.; Lowell, C. E.; Niedzwiecki, R. W.; Nainiger, J. J.

    1979-01-01

    The technical progress made during the first 15 months of a planned 40-month project to provide a critical-technology data base for utility gas-turbine systems capable of burning coal-derived fuels is summarized. Tasks were included in the following areas: (1) combustion, to study the combustion of coal-derived fuels and conversion of fuel-bound nitrogen to NOx; (2) materials, to understand and prevent hot corrosion; and (3) system studies, to integrate and guide the other technologies. Significant progress was made.

  5. INTEGRATED GASIFICATION COMBINED CYCLE PROJECT 2 MW FUEL CELL DEMONSTRATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FuelCell Energy

    2005-05-16

    With about 50% of power generation in the United States derived from coal and projections indicating that coal will continue to be the primary fuel for power generation in the next two decades, the Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCTDP) has been conducted since 1985 to develop innovative, environmentally friendly processes for the world energy market place. The 2 MW Fuel Cell Demonstration was part of the Kentucky Pioneer Energy (KPE) Integrated Gasification Combined Cycle (IGCC) project selected by DOE under Round Five of the Clean Coal Technology Demonstration Program. The participant in the CCTDP Vmore » Project was Kentucky Pioneer Energy for the IGCC plant. FuelCell Energy, Inc. (FCE), under subcontract to KPE, was responsible for the design, construction and operation of the 2 MW fuel cell power plant. Duke Fluor Daniel provided engineering design and procurement support for the balance-of-plant skids. Colt Engineering Corporation provided engineering design, fabrication and procurement of the syngas processing skids. Jacobs Applied Technology provided the fabrication of the fuel cell module vessels. Wabash River Energy Ltd (WREL) provided the test site. The 2 MW fuel cell power plant utilizes FuelCell Energy's Direct Fuel Cell (DFC) technology, which is based on the internally reforming carbonate fuel cell. This plant is capable of operating on coal-derived syngas as well as natural gas. Prior testing (1992) of a subscale 20 kW carbonate fuel cell stack at the Louisiana Gasification Technology Inc. (LGTI) site using the Dow/Destec gasification plant indicated that operation on coal derived gas provided normal performance and stable operation. Duke Fluor Daniel and FuelCell Energy developed a commercial plant design for the 2 MW fuel cell. The plant was designed to be modular, factory assembled and truck shippable to the site. Five balance-of-plant skids incorporating fuel processing, anode gas oxidation, heat recovery, water treatment/instrument air, and power conditioning/controls were built and shipped to the site. The two fuel cell modules, each rated at 1 MW on natural gas, were fabricated by FuelCell Energy in its Torrington, CT manufacturing facility. The fuel cell modules were conditioned and tested at FuelCell Energy in Danbury and shipped to the site. Installation of the power plant and connection to all required utilities and syngas was completed. Pre-operation checkout of the entire power plant was conducted and the plant was ready to operate in July 2004. However, fuel gas (natural gas or syngas) was not available at the WREL site due to technical difficulties with the gasifier and other issues. The fuel cell power plant was therefore not operated, and subsequently removed by October of 2005. The WREL fuel cell site was restored to the satisfaction of WREL. FuelCell Energy continues to market carbonate fuel cells for natural gas and digester gas applications. A fuel cell/turbine hybrid is being developed and tested that provides higher efficiency with potential to reach the DOE goal of 60% HHV on coal gas. A system study was conducted for a 40 MW direct fuel cell/turbine hybrid (DFC/T) with potential for future coal gas applications. In addition, FCE is developing Solid Oxide Fuel Cell (SOFC) power plants with Versa Power Systems (VPS) as part of the Solid State Energy Conversion Alliance (SECA) program and has an on-going program for co-production of hydrogen. Future development in these technologies can lead to future coal gas fuel cell applications.« less

  6. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  7. High throughput manufacturing of thin-film CdTe photovoltaic modules. Annual subcontract report, 16 November 1993--15 November 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sandwisch, D W

    1995-11-01

    This report describes work performed by Solar Cells, Inc. (SCI), under a 3-year subcontract to advance SCI`s PV manufacturing technologies, reduce module production costs, increase module performance, and provide the groundwork for SCI to expand its commercial production capacities. SCI will meet these objectives in three phases by designing, debugging, and operating a 20-MW/year, automated, continuous PV manufacturing line that produces 60-cm {times} 120-cm thin-film CdTe PV modules. This report describes tasks completed under Phase 1 of the US Department of Energy`s PV Manufacturing Technology program.

  8. The Department of the Navy Subcontracting Program Update

    DTIC Science & Technology

    2014-08-01

    calculaCon  of  single  FY   acCvity  at  the  contract  level   Tot   Subcontracting SB SDB WOSB HUB VOSB SDVOSB 2011...2014   Office of Small Business Programs Department of the Navy http://SmallBusiness.Navy.mil SB SDB WOSB HUB SDV FY14 Average 37.0% 5.7...6.8% 2.6% 3.0% Trend Analysis 38.0% 5.8% 6.8% 2.4% 3.1% FY 14 Targets 37.0% 5.7% 6.8% 2.5% 3.0% SB SDB WOSB HUB SDV FY 14 DoD-Wide Goals 36.7% 3.0

  9. Federal employees health benefits acquisition regulation: large provider agreements, subcontracts, and miscellaneous changes. Final rule.

    PubMed

    2005-06-01

    The Office of Personnel Management (OPM) is issuing this final regulation to amend the Federal Employees Health Benefits Acquisition Regulation (FEHBAR). It establishes requirements, including audit, for Federal Employees Health Benefits Program (FEHB) experience-rated carriers' Large Provider Agreements. It also modifies the dollar threshold for review of carriers' subcontract agreements; revises the definitions of Cost or Pricing Data and Experience-rate to reflect mental health parity requirements; updates the contract records retention requirement; updates the FEHB Clause Matrix; and conforms subpart and paragraph references to Federal Acquisition Regulation (FAR) revisions made since we last updated the FEHBAR.

  10. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  11. The U.S. RERTR program status and progress.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Travelli, A.

    1998-01-21

    The progress of the Reduced Enrichment Research and Test Reactor (RERTR) Program since its inception in 1978 is described. A brief summary of the results which the RERTR Program had achieved by the end of 1996 in collaboration with its many international partners is followed by a detailed review of the major events, findings, and activities of 1997. Significant progress has been made during the past year. In the area of U.S. acceptance of spent fuel from foreign research reactors, several shipments have taken place and additional are being planned. Intense fuel development activities are in progress, including procurement ofmore » equipment, screening of candidate materials, and production of microplates. Irradiation of the first series of microplates began in August 1997 in the Advanced Test Reactor, in Idaho. Progress has been made in the Russian RERTR program, which aims to develop and demonstrate within five years the technical means needed to convert Russian-supplied research reactors to LEU fuels. The study of an alternative LEU core for the FRM-II design has been extended to address, with favorable results, controversial performance issues which were raised at last year's meeting. Progress was also made on several aspects of producing molybdenum-99 from fission targets utilizing LEU instead of HEU. Various types of targets and processes are being pursued, with FDA approval of an LEU process projected to occur within two years. The feasibility of LEU Fuel conversion for three important DOE research reactors (BMRR, HFBR, and HFIR) has been evaluated by the RERTR program. In spite of the many momentous events which have occurred during the intervening years, and the excellent progress achieved, the most important challenges that the RERTR program faces today are not very different in type from those that were faced during the first RERTR meeting. Now, as then, the most important task is to develop new LEU fuels satisfying requirements which cannot be satisfied by any existing fuel. These new advanced fuels will enable conversion of the reactors which cannot be converted today, ensure better efficiency and performance for all research reactors, and allow the design of more powerful new advanced LEU reactors. As in the past, the success of the RERTR program will depend on free exchange of ideas and information, and on the international friendship and cooperation that have been a trademark of the RERTR program since its inception.« less

  12. NREL and Fraunhofer ISE to Collaborate on Hydrogen and Fuel Cell Research |

    Science.gov Websites

    (R&D) activities to accelerate progress in these fields. NREL's long-term research and accelerate progress toward shared R&D goals and to ensure sustainable use of hydrogen and fuel cell Fraunhofer ISE in the following areas: Electrolysis, including cell, stack, and system R&D and

  13. A PSFI-based analysis on the energy efficiency potential of China’s domestic passenger vehicles

    NASA Astrophysics Data System (ADS)

    Chen, Chuan; Ren, Huanhuan; Zhao, Dongchang

    2017-01-01

    In this article, China’s domestic passenger vehicles (excluding new energy vehicles) are categorized into two groups: local brand vehicles and vehicles manufactured by joint ventures. Performance-Size-Fuel economy Index (PSFI) will be applied to analyse the speed of technical progress and the future trends of these vehicles. In addition, a forecast on energy efficiency potential of domestic passenger vehicles from 2016 to 2020 will be made based on different Emphasis on Reducing Fuel Consumption (ERFC) scenarios. According to the study, if the process of technical progress continues at its current speed, domestic ICE passenger vehicles will hardly meet Phase IV requirements by 2020 even though companies contribute as much technical progress to fuel consumption reduction as possible.

  14. NOx Control for Utility Boiler OTR Compliance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hamid Farzan

    Under sponsorship of the Department of Energy's National Energy Technology Laboratory (NETL), the Babcock and Wilcox Company (B and W), and Fuel Tech teamed together to investigate an integrated solution for NO{sub x} control. The system is comprised of B and W's DRB-4Z{trademark} ultra low-NO{sub x} pulverized coal (PC) burner technology and Fuel Tech's NOxOUT{reg_sign}, a urea-based selective non-catalytic reduction (SNCR) technology. Development of the low-NO{sub x} burner technology has been a focus in B and W's combustion program. The DRB-4Z{trademark} burner is B and W's newest low-NO{sub x} burner capable of achieving very low NO{sub x}. The burner ismore » designed to reduce NO{sub x} by controlled mixing of the fuel and air. Based on data from several 500 to 600 MWe boilers firing PRB coal, NOx emissions levels of 0.15 to 0.20 lb/ 106 Btu have been achieved from the DRB-4Z{trademark} burners in combination with overfire air ports. Although NOx emissions from the DRB-4Z{trademark} burner are nearing the Ozone Transport Rule (OTR) level of 0.15 lb NO{sub x}/106 Btu, the utility boiler owners can still benefit from the addition of an SNCR and/or SCR system in order to comply with the stringent NO{sub x} emission levels facing them. Large-scale testing is planned in B and W's 100-million Btu/hr Clean Environment Development Facility (CEDF) that simulates the conditions of large coal-fired utility boilers. The objective of the project is to achieve a NO{sub x} level below 0.15 lb/106 Btu (with ammonia slip of less than 5 ppm) in the CEDF using PRB coal and B and W's DRB-4Z{trademark} low-NO{sub x} pulverized coal (PC) burner in combination with dual zone overfire air ports and Fuel Tech's NO{sub x}OUT{reg_sign}. During this period B and W prepared and submitted the project management plan and hazardous substance plan to DOE. The negotiation of a subcontract for Fuel Tech has been started.« less

  15. Progress in fuel systems to meet new fuel economy and emissions standards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-12-31

    This publication includes information describing the latest developments within the automotive industry on fuel system hardware and control strategies. Contents include: Slow heating process of a heated pintle-type gasoline fuel injector; Mixture preparation measurements; Study of fuel flow rate change in injector for methanol fueled S.I. engine; Flow and structural analysis for fuel pressure regulator performance; A new method to analyze fuel behavior in a spark ignition engine; Throttle body at engine idle -- tolerance effect on flow rate; and more.

  16. Fuel Cell Buses in U.S. Transit Fleets : Current Status 2014

    DOT National Transportation Integrated Search

    2014-12-03

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. Various stakeholders, including d...

  17. Light-water-reactor safety research program. Quarterly progress report, July--September 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1975-01-01

    Progress is summarized in the following research and development areas: (1) loss-of-coolant accident research; heat transfer and fluid dynamics; (2) transient fuel response and fission-product release; and (3) mechanical properties of Zircaloy containing oxygen. Also included is an appendix on Kinetics of Fission Gas and Volatile Fission-product Behavior under Transient Conditions in LWR Fuel.

  18. 5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. CONSTRUCTION PROGRESS VIEW OF ASSEMBLY USED TO RAISE AND LOWER FUEL ELEMENTS. TAKEN FROM TOP OF SHIELDING TANK WITH CAMERA POINTING TOWARDS BOTTOM OF TANK. SHOWS LADDER, SQUARE LIFTING FRAME, FUEL ELEMENT HOLDERS, AND CABLE CYLINDERS. INEL PHOTO NUMBER 65-5434, TAKEN OCTOBER 20, 1965. - Idaho National Engineering Laboratory, Advanced Reentry Vehicle Fusing System, Scoville, Butte County, ID

  19. Progress Report Phase I: Use, access, and fire/fuels management attitudes and preferences of user groups concerning the Valles Caldera National Preserve (VCNP) and adjacent areas

    Treesearch

    Kurt F. Anschuetz; Carol B. Raish

    2010-01-01

    This document represents a progress report of activities completed during Phase I of the study titled, Use, Access, and Fire/Fuels Management Attitudes and Preferences of User Groups Concerning the Valles Caldera National Preserve (VCNP) and Adjacent Areas, and the preliminary findings of this work.

  20. Goldman - Georgetown University | Division of Cancer Prevention

    Cancer.gov

    Principal Investigator: Radoslav (Rado) Goldman, PhDInstitution: Georgetown University, Washington, DC Subcontract Principal Investigator: Raja Mazumder, PhDInstitution: George Washington University |

  1. PATHFINDER ATOMIC POWER PLANT TECHNICAL PROGRESS REPORT FOR JULY 1, 1959- SEPTEMBER 30, 1959

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1960-10-31

    ABS>Fuel Element Research and Development. Dynamic and static corrosion tests on 8001 Al were completed. Annealmmmg of 1100 cladding on 5083 and M400 cladding on X2219 were tested at 500 deg C, and investigation continued on producing X8101 Al alloy cladding in tube plates by extrusion. Boiler fuel element capsule irradiation tests and subassembly tests are described Heat transfer loop studies and fuel fabrication for the critical facility are reported. Boiler fuel element mechanical design and testing progress is desc ribed. and the superheater fuel element temperature evaluating routine is discussed. Low- enrichment superheater fuel element development included design studiesmore » and stainless steel powder and UO/sub 2/ powder fabrication studies Reactor Mechanical Studies. Research is reported on vessel and structure design, fabrication, and testing, recirculation system design, steam separator tests, and control rod studies. Nuclear Analysis. Reactor physics studies are reported on nuclear constants, baffle plate analysis, comparison of core representations, delayed neutron fraction. and shielding analysis of the reactor building. Reactor and system dynamics and critical experiments were also studied. Chemistry. Progress is reported on recombiner. radioactive gas removal and storage, ion exchanger and radiochemical processing. (For preceding period see ACNP-5915.) (T.R.H.)« less

  2. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2017

    DOT National Transportation Integrated Search

    2017-11-01

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of ...

  3. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2016

    DOT National Transportation Integrated Search

    2016-11-01

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of ...

  4. Fuel Cell Buses in U.S. Transit Fleets : Current Status 2015

    DOT National Transportation Integrated Search

    2015-12-01

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of ...

  5. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, March 15-16, 1979, Tampa, Florida. Third quarterly progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-04-24

    The eleventh quarterly coordination meeting of the methane production group of the Fuels From Biomass Systems Branch, US Department of Energy was held at Tampa, Florida, March 15-16, 1979. Progress reports were presented by the contractors and a site visit was made to Kaplan Industries, Bartow, Florida to see the Hamilton Standard demonstration facility for digestion of environmental feedlot residue to methane. A meeting agenda, a list of attendees, and progress reports are presented.

  6. Status of liquid metal fast breeder reactor fuel development in Japan

    NASA Astrophysics Data System (ADS)

    Katsuragawa, M.; Kashihara, H.; Akebi, M.

    1993-09-01

    The mixed-oxide fuel technology for a liquid metal fast breeder reactor (LMFBR) in Japan is progressing toward commercial deployment of LMFBR. Based on accumulated experience in Joyo and Monju fuel development, efforts for large scale LMFBR fuel development are devoted to improved irradiation performance, reliability and economy. This paper summarizes accomplishments, current activities and future plans for LMFBR fuel development in Japan.

  7. Two cases of methyl alcohol intoxication by sub-chronic inhalation and dermal exposure during aluminum CNC cutting in a small-sized subcontracted factory.

    PubMed

    Ryu, Jia; Lim, Key Hwan; Ryu, Dong-Ryeol; Lee, Hyang Woon; Yun, Ji Young; Kim, Seoung-Wook; Kim, Ji-Hoon; Jung-Choi, Kyunghee; Kim, Hyunjoo

    2016-01-01

    Methyl alcohol poisoning has been mainly reported in community. Two cases of methyl alcohol poisoning occurred in a small-sized subcontracted factory which manufactured smartphone parts in Korea. One young female patient presented with dyspnea and visual disturbance. Another young male patient presented with visual disturbance and myalgia. They treated with sodium bicarbonate infusion and hemodialysis for metabolic acidosis. In addition, he received ethyl alcohol per oral treatment. Her and his urinary methyl alcohol concentration was detected as 7.632 mg/L, 46.8 mg/L, respectively, although they were treated hemodialysis. Results of the working environment measurement showed that the concentration of methyl alcohol (1030.1-2220.5 ppm) in the air exceeded the time weighted average (200 ppm). They were diagnosed with optic neuropathy due to methyl alcohol poisoning and still have visual impairment. Workers who hired as dispatched employees in a small-sized subcontracted factory were exposed to high concentrations of methyl alcohol. The workplace had poor ventilation system. In addition, workers did not wear proper personal protect equipment. Working environment measurement and annual chekups for workers were not performed. They were in a blind spot to occupational safety and health. More attention is needed to protect vulnerable workers' health.

  8. Loop-mediated isothermal amplification method for diagnosing Pneumocystis pneumonia in HIV-uninfected immunocompromised patients with pulmonary infiltrates.

    PubMed

    Nakashima, Kei; Aoshima, Masahiro; Ohkuni, Yoshihiro; Hoshino, Eri; Hashimoto, Kohei; Otsuka, Yoshihito

    2014-12-01

    Loop-mediated isothermal amplification (LAMP) is becoming an established nucleic acid amplification method offering rapid, accurate, and cost-effective diagnosis of infectious diseases. We retrospectively evaluated 78 consecutive HIV-uninfected patients who underwent LAMP method for diagnosing Pneumocystis pneumonia (PCP). Diagnosis of PCP was made by the detection of Pneumocystis jirovecii (P. jirovecii) with positive LAMP or conventional staining (CS) (Grocott methenamine silver staining or Diff-Quick™) on the basis of compatible clinical symptoms and radiologic findings. Additionally, we reviewed HIV-uninfected immunocompromised patients who underwent subcontract PCR as a historical control. LAMP was positive in 10 (90.9%) of 11 positive-CS patients. Among 13 negative-CS patients with positive LAMP, 11 (84.6%) had PCP, and the remaining 2 were categorized as having P. jirovecii colonization. LDH levels in negative-CS PCP were higher than in positive-CS PCP (p = 0.026). (1 → 3)-β-D-glucan levels in negative-CS PCP were lower than in positive-CS PCP (p = 0.011). The interval from symptom onset to diagnosis as PCP in LAMP group (3.45 ± 1.77 days; n = 22) was shorter than in subcontract PCR group (6.90 ± 2.28 days; n = 10; p < 0.001). As for patients without PCP, duration of unnecessary PCP treatment in LAMP group (2; 2-3 days; n = 10) was shorter than in subcontract PCR group (7; 7-12.25 days; n = 6; p = 0.003). LAMP showed higher sensitivity (95.4%) and positive predictive value (91.3%) than subcontract PCR did. Pneumocystis LAMP method is a sensitive and cost-effective diagnostic method and is easy to administer in general hospitals. In-house LAMP method would realize early diagnosis of PCP, resulting in improving PCP prognosis and reducing unnecessary PCP-specific treatment. Copyright © 2014 Japanese Society of Chemotherapy and The Japanese Association for Infectious Diseases. Published by Elsevier Ltd. All rights reserved.

  9. 2011 Annual Progress Report: DOE Hydrogen and Fuel Cells Program (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In the past year, the DOE Hydrogen and Fuel Cells Program (the Program) made substantial progress toward its goals and objectives. The Program has conducted comprehensive and focused efforts to enable the widespread commercialization of hydrogen and fuel cell technologies in diverse sectors of the economy. With emphasis on applications that will effectively strengthen our nation's energy security and improve our stewardship of the environment, the Program engages in research, development, and demonstration of critical improvements in the technologies. Highlights of the Program's accomplishments can be found in the sub-program chapters of this report.

  10. Recapturing Graphite-Based Fuel Element Technology for Nuclear Thermal Propulsion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trammell, Michael P; Jolly, Brian C; Miller, James Henry

    ORNL is currently recapturing graphite based fuel forms for Nuclear Thermal Propulsion (NTP). This effort involves research and development on materials selection, extrusion, and coating processes to produce fuel elements representative of historical ROVER and NERVA fuel. Initially, lab scale specimens were fabricated using surrogate oxides to develop processing parameters that could be applied to full length NTP fuel elements. Progress toward understanding the effect of these processing parameters on surrogate fuel microstructure is presented.

  11. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2011

    DOT National Transportation Integrated Search

    2011-11-11

    his report is the fifth in a series of annual status reports that summarize the progress resulting from fuel cell transit bus demonstrations in the United States and provide a discussion of the achievements and challenges of fuel cell propulsion in t...

  12. Fuel Cell Buses in U.S. Transit Fleets : Current Status 2012

    DOT National Transportation Integrated Search

    2012-11-12

    This report is the sixth in an annual series of reports that summarize the progress of fuel cell electric bus (FCEB) development in the United States and discuss the achievements and challenges of introducing fuel cell propulsion in transit. The repo...

  13. Fuel Cell Buses in U.S. Transit Fleets : Current Status 2013

    DOT National Transportation Integrated Search

    2013-12-01

    This report is the seventh in an annual series of reports that summarize the progress of fuel cell electric bus (FCEB) development in the United States and discuss the achievements and challenges of introducing fuel cell propulsion in transit. This r...

  14. Development of OTM Syngas Process and Testing of Syngas Derived Ultra-clean Fuels in Diesel Engines and Fuel Cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.T.; James P. Meagher; Prasad Apte

    2002-12-31

    This topical report summarizes work accomplished for the Program from November 1, 2001 to December 31, 2002 in the following task areas: Task 1: Materials Development; Task 2: Composite Development; Task 4: Reactor Design and Process Optimization; Task 8: Fuels and Engine Testing; 8.1 International Diesel Engine Program; 8.2 Nuvera Fuel Cell Program; and Task 10: Program Management. Major progress has been made towards developing high temperature, high performance, robust, oxygen transport elements. In addition, a novel reactor design has been proposed that co-produces hydrogen, lowers cost and improves system operability. Fuel and engine testing is progressing well, but wasmore » delayed somewhat due to the hiatus in program funding in 2002. The Nuvera fuel cell portion of the program was completed on schedule and delivered promising results regarding low emission fuels for transportation fuel cells. The evaluation of ultra-clean diesel fuels continues in single cylinder (SCTE) and multiple cylinder (MCTE) test rigs at International Truck and Engine. FT diesel and a BP oxygenate showed significant emissions reductions in comparison to baseline petroleum diesel fuels. Overall through the end of 2002 the program remains under budget, but behind schedule in some areas.« less

  15. Fuel gas production from animal and agricultural residues and biomass. Quarterly coordination meeting, December 11-12, 1978, Denver, Colorado. Second Quarterly progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wise, D L; Ashare, E; Wentworth, R L

    1979-01-05

    The tenth quarterly coordination meeting of the methane production group of the Fuels from Biomass Systems Branch, US Department of Energy was held at Denver, Colorado, December 11-12, 1978. Progress reports were presented by the contractors and a site visit was made to the Solar Energy Research Institute, Golden, Colorado. A meeting agenda, a list of attendees, and progress are presented. Report titles are: pipeline fuel gas from an environmental feedlot; operation of a 50,000 gallon anaerobic digester at the Monroe State Dairy Farm near Monroe, Washington; anaerobic fermentation of livestock and crop residues; anaerobic fermentation of agricultural residues -more » potential for improvement and implementation; heat treatment of organics for increasing anaerobic biodegradability; and biological conversion of biomass to methane. (DC)« less

  16. Target fuel quality standards performance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hublin, M.; Renault, S.A.

    Concerned by a large number of in-service incident due to insufficient quality of market fuels that happened in the 1980s in France and Europe, the two major French car manufacturers-PSA Peugeot Citroen and Renault-decided to define new technical requirements for these fuels. By publishing the fuel charter in July 1989, a whole fuel quality monitoring system was established. Forthcoming fuel refiners and distributors were invited to produce and sell fuels of higher quality. Major French distributors joined the charter, and soon, an improvement on French market fuels was observed. Undoubtedly, the two oil crises, in 1973 and 1979, have boostedmore » technological progress of combustion engines, improving specific power, operating noise, exhaust emissions and fuel consumption. That technological progress was achieved by defining and carrying out research that contributed to a better understanding of combustion engines. Continuous and gradual evolution in the design of engines was achieved in areas such as: combustion, internal air motion, multi-valve technology, fuel injection, engine management systems, friction reduction and after-treatment devices. As long as national fuel specifications define fuel characteristics in a rough and insufficient way, there will be the need for quality fuel certification. Different countries, bearing different cultures, will probably produce slightly different variations, but will continue to exist and increase in number. Fuel quality is a key issue for the future to guarantee trouble-free and comfortable vehicle operation and also to maintain its original emissions characteristics.« less

  17. Development of an extended-burnup Mark B design. First semi-annual progress report, July-December 1978. Report BAW-1532-1. [PWR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1979-10-01

    The primary objective of this program is to develop and demonstrate an improved PWR fuel assembly design capable of batch average burnups of 45,000-50,000 MWd/mtU. To accomplish this, a number of technical areas must be investigated to verify acceptable extended-burnup fuel performance. This report is the first semi-annual progress report for the program, and it describes work performed during the July-December 1978 time period. Efforts during this period included the definition of a preliminary design for a high-burnup fuel rod, physics analyses of extended-burnup fuel cycles, studies of the physics characteristics of changes in fuel assembly metal-to-water ratios, and developmentmore » of a design concept for post-irradiation examination equipment to be utilized in examining high-burnup lead-test assemblies.« less

  18. The history, genotoxicity and carcinogenicity of carbon-based fuels and their emissions: part 4 - alternative fuels.

    PubMed

    Claxton, Larry D

    2015-01-01

    Much progress has been made in reducing the pollutants emitted from various combustors (including diesel engines and power plants) by the use of alternative fuels; however, much more progress is needed. Not only must researchers improve fuels and combustors, but also there is a need to improve the toxicology testing and analytical chemistry methods associated with these complex mixtures. Emissions from many alternative carbonaceous fuels are mutagenic and carcinogenic. Depending on their source and derivation, alternative carbonaceous fuels before combustion may or may not be genotoxic; however, in order to know their genotoxicity, appropriate chemical analysis and/or bioassay must be performed. Newly developed fuels and combustors must be tested to determine if they provide a public health advantage over existing technologies - including what tradeoffs can be expected (e.g., decreasing levels of PAHs versus increasing levels of NOx and possibly nitroarenes in ambient air). Another need is to improve exposure estimations which presently are a weak link in doing risk analyses. Copyright © 2014 Elsevier B.V. All rights reserved.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saccomanno, G.

    ''Early Lung Cancer Detection in Uranium Miners with Abnormal Sputum Cytology'' was funded by the Department of Energy to monitor the health effects of radon exposure and/or cigarette smoke on uranium workers from the Colorado Plateau. The resulting Saccomanno Uranium Workers Archive and data base has been used as a source of information to prove eligibility for compensation under the Radiation Exposure Compensation Act and as the source of primary data tissue for a subcontract and other collaborations with outside investigators. The latter includes a study of radon exposure and lung cancer risk in a non-smoking cohort of uranium minersmore » (subcontract); a study of genetic markers for lung cancer susceptibility; and a study of {sup 210}Pb accumulation in the skull as a biomarker of radon exposure.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Holley, W A

    This report describes work performed under a subcontract to the National Renewable Energy Laboratory under the Photovoltaic Manufacturing Technology Project. The objectives of this subcontract are to (1) define the problem of yellowing/browning of EVA-based encapsulants; (2) determine probable mechanisms and the role of various parameters such as heat, UV exposure, module construction, EVA interfaces, and EVA thickness, in the browning of EVA-based encapsulants; (3) develop stabilization strategies for various module constructions to protect the encapsulant from degradative failure; (4) conduct laboratory, accelerated outdoor, and field testing of encapsulant, laminated test coupons, and full modules to demonstrate the functional adequacymore » of the stabilization strategies; and (5) implement these strategies. This report summarizes the accomplishments related to the above goals for the reporting period.« less

  1. SIG Galileo final converter technical summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hinderman, J.D.

    1979-05-01

    The report is primarily concerned with the work performed for DOE on converter development and fabrication for the NASA Galileo Jupiter mission as a DOE prime contractor with interface primarily with Teledyne Energy Systems. The activities reported on were directed toward design, analysis and testing of modules and converters SN-1 thru SN-7 and attendant Quality Control and Reliability effort. Although assembly and testing of SN-1 was not accomplished due to the stop work order, the design was virtually completed and a significant amount of subcontracting and manufacturing of both module and converter components was underway. These subcontracting and manufacturing activitiesmore » were selectively closed down depending upon degree of completion and material or hardware potential usage in the Technology Program.« less

  2. 48 CFR 970.5226-1 - Diversity plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... through (1) the Contractor's work force, (2) educational outreach, (3) community involvement and outreach, (4) subcontracting, (5) economic development (including technology transfer), and (6) the prevention...

  3. 48 CFR 44.202-2 - Considerations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... purchasing system or performance is inadequate; (2) Close working relationships or ownership affiliations... subcontracting with small, veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged and women...

  4. Cleaner cooking solutions to achieve health, climate, and economic cobenefits.

    PubMed

    Anenberg, Susan C; Balakrishnan, Kalpana; Jetter, James; Masera, Omar; Mehta, Sumi; Moss, Jacob; Ramanathan, Veerabhadran

    2013-05-07

    Nearly half the world's population must rely on solid fuels such as biomass (wood, charcoal, agricultural residues, and animal dung) and coal for household energy, burning them in inefficient open fires and stoves with inadequate ventilation. Household solid fuel combustion is associated with four million premature deaths annually; contributes to forest degradation, loss of habitat and biodiversity, and climate change; and hinders social and economic progress as women and children spend hours every day collecting fuel. Several recent studies, as well as key emerging national and international efforts, are making progress toward enabling wide-scale household adoption of cleaner and more efficient stoves and fuels. While significant challenges remain, these efforts offer considerable promise to save lives, improve forest sustainability, slow climate change, and empower women around the world.

  5. FY2017 Advanced Combustion Systems and Fuels Annual Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Advanced Combustion Systems and Fuels Program supports VTO’s goal and focuses early-stage research and development (R&D) to improve understanding of the combustion processes, fuel properties, and emission control technologies while generating knowledge and insight necessary for industry to develop the next generation of engines.

  6. 75 FR 70031 - Antitrust Division

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ...) operate a branding program based upon distinctive trademarks to create high customer awareness of, demand... or subcontract a branding program; (vii) create printed and/or electronic materials for distribution...

  7. Early Rockets

    NASA Image and Video Library

    1940-03-21

    Goddard rocket in launching tower at Roswell, New Mexico, March 21, 1940. Fuel was injected by pumps from the fueling platform at left. From 1930 to 1941, Dr. Goddard made substantial progress in the development of progressively larger rockets, which attained altitudes of 2400 meters, and refined his equipment for guidance and control, his techniques of welding, and his insulation, pumps, and other associated equipment. In many respects, Dr. Goddard laid the essential foundations of practical rocket technology

  8. Fuel Processor Development for a Soldier-Portable Fuel Cell System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Palo, Daniel R.; Holladay, Jamie D.; Rozmiarek, Robert T.

    2002-01-01

    Battelle is currently developing a soldier-portable power system for the U.S. Army that will continuously provide 15 W (25 W peak) of base load electric power for weeks or months using a micro technology-based fuel processor. The fuel processing train consists of a combustor, two vaporizers, and a steam-reforming reactor. This paper describes the concept and experimental progress to date.

  9. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  10. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  11. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  12. 48 CFR 49.305-1 - General.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... the work performed by the contractor (e.g., planning, scheduling, technical study, engineering work production and supervision, placing and supervising subcontracts, and work performed by the contractor in (1...

  13. 75 FR 33269 - Procurement List; Additions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-11

    ... Procurement List: Product Wooden Trunk Locker NSN: 8460-00-243-3234. NPA: Employment Source, Inc... competitor enjoying a profitable subcontract forever if the commercial portion of the trunk locker...

  14. 40 CFR 35.938-9 - Subcontracts under construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean... prime contractor under a formally advertised, competitively bid, fixed price construction contract...

  15. 48 CFR 2052.215-75 - Proposal presentation and format.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., education, and employment history of its employees, subcontractor personnel, and consultants, through... and categories, materials, subcontracts, travel, computer time, etc., must be included so that the...

  16. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  17. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  18. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  19. 48 CFR 836.574 - Subcontracts and work coordination.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 836.574... complex mechanical-electrical work, the contracting officer may use the clause with its Alternate I. ...

  20. 48 CFR 3019.705-1 - General support for the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SECURITY, HOMELAND SECURITY ACQUISITION REGULATION (HSAR) SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Small Business Subcontracting Program 3019.705-1 General support for the program. In any...

  1. Low-Activity Waste Pretreatment System Additional Engineering-Scale Integrated Test Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Landon, Matt R.; Wilson, Robert A.

    Washington River Protections Solutions, LLC’s (WRPS) Low Activity Waste Pretreatment System (LAWPS) Project provides for the early production of immobilized low-activity waste (ILAW) by feeding LAW directly from Tank Farms to the Waste Treatment and Immobilization Plant (WTP) LAW Facility, bypassing the WTP Pretreatment Facility. Prior to the transfer of feed to the WTP LAW Vitrification Facility, tank supernatant waste will be pretreated in the LAWPS to meet the WTP LAW waste acceptance criteria (WAC). Full-scale and engineering-scale testing of critical technology elements, as part of the technology maturation process, are components of the overall LAWPS Project. WRPS awarded themore » engineering-scale integrated testing scope to AECOM via WRPS Subcontract 58349. This report is deliverable MSR-008 of the subcontract.« less

  2. Early Fuel Cell Market Demonstrations | Hydrogen and Fuel Cells | NREL

    Science.gov Websites

    Handling Equipment Data Collection and Analysis: 2015 Report, DOE Hydrogen and Fuel Cells Program Annual Progress Report (December 2015) Material Handling Equipment Data Collection and Analysis: 2015 Review, DOE Technical Report (March 2015) 2014 Forklift and Backup Power Data Collection and Analysis: 2014 Report, DOE

  3. [Organization and technology in the grocery store sector].

    PubMed

    Gambetti, Edy

    2014-01-01

    In Italy, grocery stores develop an annual turnover of 92 billion of , (data referred to 2013) and have 28.232 stores spread over a commercial area of 17.224.000 m2. The business involved are 252, linked with 30 important distribution leader companies. The total workforce is about 280.000 people. The grocery stores structure is composed by suppliers and producers warehouses and different kinds of stores (hypermarkets, supermarkets, shops and discounts). In the stores, the technological progress concerns fundamentally back-office operations; the improvement of information and computer science is the main renewal source. Other tasks as receiving goods and stocking shelves are still executed without specific inovations. In terms of organization, we observed a strong increase of part-time workers, the development of atypical contract and thie inclination to contract the easiest jobs (for example, stocking shelves). Also the warehouses often use to sub-contract the picking tasks. The increase of on-line shopping, also concerning the groceries, represents the most relevant evolution in tire near future.

  4. Extraction studies. Final report, May 6, 1996--September 30, 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    During the first week of this effort, an Alpkem RFA-300 4-channel automated chemical analyzer was transferred to the basement of building 42 at TA-46 for the purpose of performing extraction studies. Initially, this instrumentation was applied to soil samples known to contain DNA. Using the SFA (Segmented Flow Analysis) technique, several fluidic systems were evaluated to perform on-line filtration of several varieties of soil obtained from Cheryl Kuske and Kaysie Banton (TA-43, Bldg. 1). Progress reports were issued monthly beginning May 15, 1996. Early in 1997 there was a shift from the conventional 2-phase system (aqueous + air) to amore » 3-phase system (oil + aqueous + air) to drastically reduce sample size and reagent consumption. Computer animation was recorded on videotape for presentations. The time remaining on the subcontract was devoted to setting up existing equipment to incorporate the 3rd phase (a special fluorocarbon oil obtained from DuPont).« less

  5. Progress in the Design and Development of the ITER Low-Field Side Reflectometer (LFSR) System

    NASA Astrophysics Data System (ADS)

    Doyle, E. J.; Wang, G.; Peebles, W. A.; US LFSR Team

    2015-11-01

    The US has formed a team, comprised of personnel from PPPL, ORNL, GA and UCLA, to develop the LFSR system for ITER. The LFSR system will contribute to the measurement of a number of plasma parameters on ITER, including edge plasma electron density profiles, monitor Edge Localized Modes (ELMs) and L-H transitions, and provide physics measurements relating to high frequency instabilities, plasma flows, and other density transients. An overview of the status of design activities and component testing for the system will be presented. Since the 2011 conceptual design review, the number of microwave transmission lines (TLs) and antennas has been reduced from twelve (12) to seven (7) due to space constraint in the ITER Tokamak Port Plug. This change has required a reconfiguration and recalculation of the performance of the front-end antenna design, which now includes use of monostatic transmission lines and antennas. Work supported by US ITER/PPPL Subcontracts S013252-C and S012340, and PO 4500051400 from GA to UCLA.

  6. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eudy, Leslie; Post, Matthew; Gikakis, Christina

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. Various stakeholders, including FCEB developers, transit agencies, and system integrators, have expressed the value of this annual status report, which provides a summary of results from evaluations performed by the National Renewable Energy Laboratory. The annual status report tracks the progress of the FCEB industry toward meeting technical targets, documents the lessons learned, and discusses the path forward for commercial viability of fuel cell technology for transit buses. Themore » 2015 summary results primarily focus on the most recent year for each demonstration, from August 2014 through July 2015. The results for these buses account for more than 1,045,000 miles traveled and 83,000 hours of fuel cell power system operation. The primary results presented in the report are from two demonstrations of fuel-cell-dominant bus designs: the Zero Emission Bay Area Demonstration Group led by Alameda-Contra Costa Transit District (AC Transit) in California and the American Fuel Cell Bus Project at SunLine Transit Agency in California.« less

  7. Dr. Robert H. Goddard and His Rocket

    NASA Technical Reports Server (NTRS)

    1940-01-01

    Goddard rocket in launching tower at Roswell, New Mexico, March 21, 1940. Fuel was injected by pumps from the fueling platform at left. From 1930 to 1941, Dr. Goddard made substantial progress in the development of progressively larger rockets, which attained altitudes of 2400 meters, and refined his equipment for guidance and control, his techniques of welding, and his insulation, pumps, and other associated equipment. In many respects, Dr. Goddard laid the essential foundations of practical rocket technology

  8. Field Demonstration of Light Obscuration Particle Counting Technologies to Detect Fuel Contaminates

    DTIC Science & Technology

    2016-12-01

    to detect fuel contamiation including particulates and free water 15. SUBJECT TERMS fuel, JP-8, aviation fuel, contamination, free water ...undissolved water , F24 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF ABSTRACT none 18. NUMBER OF PAGES 12 19a. NAME OF RESPONSIBLE PERSON Joel...technical, interim, memorandum, master’s thesis, progress, quarterly, research , special, group study, etc. 3. DATES COVERED. Indicate the time during

  9. 48 CFR 22.1603 - Exceptions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... or subcontracts for work performed exclusively outside the United States. (b) Exemptions granted by... ability of the Government to procure goods and services on an economical and efficient basis or if special...

  10. 48 CFR 15.401 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 15.401 Definitions. As used in this subpart— Price means cost plus any fee or profit applicable to the contract type. Subcontract (except as...

  11. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  12. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  13. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  14. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  15. 25 CFR 900.49 - What procurement standards apply to subcontracts?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF HEALTH AND HUMAN SERVICES CONTRACTS UNDER THE INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Standards for Tribal or Tribal Organization Management Systems Procurement Management System...

  16. 42 CFR 480.120 - Information subject to disclosure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... subcontracts under those contracts (except for proprietary or business information); (3) Copies of documents..., including a study design and methodology. (b) Aggregate statistical information that does not implicitly or...

  17. High-freezing-point fuel studies

    NASA Technical Reports Server (NTRS)

    Tolle, F. F.

    1980-01-01

    Considerable progress in developing the experimental and analytical techniques needed to design airplanes to accommodate fuels with less stringent low temperature specifications is reported. A computer technique for calculating fuel temperature profiles in full tanks was developed. The computer program is being extended to include the case of partially empty tanks. Ultimately, the completed package is to be incorporated into an aircraft fuel tank thermal analyser code to permit the designer to fly various thermal exposure patterns, study fuel temperatures versus time, and determine holdup.

  18. FY2017 Technology Integration Annual Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The 2017 Technology Integration Annual Progress Report covers 27 multi-year projects funded by the Vehicle Technologies Office. The report includes information on 20 competitively awarded projects, ranging from training on alternative fuels and vehicles for first responders, to safety training and design for maintenance facilities housing gaseous fuel vehicles, to electric vehicle community partner programs. It also includes seven projects conducted by several of VTO’s national laboratory partners, Argonne National Laboratory, Oak Ridge National Laboratory and the National Renewable Energy Laboratory. These projects range from a Technical Assistance project for business, industry, government and individuals, to the EcoCar 3 Studentmore » Competition, and the Fuel Economy Information Project.« less

  19. Dilute Oxygen Combustion Phase IV Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Riley, M.F.

    2003-04-30

    Novel furnace designs based on Dilute Oxygen Combustion (DOC) technology were developed under subcontract by Techint Technologies, Coraopolis, PA, to fully exploit the energy and environmental capabilities of DOC technology and to provide a competitive offering for new furnace construction opportunities. Capital cost, fuel, oxygen and utility costs, NOx emissions, oxide scaling performance, and maintenance requirements were compared for five DOC-based designs and three conventional air5-fired designs using a 10-year net present value calculation. A furnace direct completely with DOC burners offers low capital cost, low fuel rate, and minimal NOx emissions. However, these benefits do not offset the costmore » of oxygen and a full DOC-fired furnace is projected to cost $1.30 per ton more to operate than a conventional air-fired furnace. The incremental cost of the improved NOx performance is roughly $6/lb NOx, compared with an estimated $3/lb. NOx for equ8pping a conventional furnace with selective catalytic reduction (SCCR) technology. A furnace fired with DOC burners in the heating zone and ambient temperature (cold) air-fired burners in the soak zone offers low capital cost with less oxygen consumption. However, the improvement in fuel rate is not as great as the full DOC-fired design, and the DOC-cold soak design is also projected to cost $1.30 per ton more to operate than a conventional air-fired furnace. The NOx improvement with the DOC-cold soak design is also not as great as the full DOC fired design, and the incremental cost of the improved NOx performance is nearly $9/lb NOx. These results indicate that a DOC-based furnace design will not be generally competitive with conventional technology for new furnace construction under current market conditions. Fuel prices of $7/MMBtu or oxygen prices of $23/ton are needed to make the DOC furnace economics favorable. Niche applications may exist, particularly where access to capital is limited or floor space limitations are critical. DOC technology will continue to have a highly competitive role in retrofit applications requiring increases in furnace productivity.« less

  20. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  1. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  2. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  3. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  4. 48 CFR 36.501 - Performance of work by the contractor.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Contract Clauses 36.501.... Specialties such as plumbing, heating, and electrical work are usually subcontracted, and should not normally...

  5. 24 CFR 882.412 - Subcontracting of owner services.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... PROGRAM, SECTION 202 SUPPORTIVE HOUSING FOR THE ELDERLY PROGRAM AND SECTION 811 SUPPORTIVE HOUSING FOR... HUD approval, rents which exceed the appropriate Moderate Rehabilitation Fair Market Rent for a unit...

  6. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  7. 48 CFR 1419.705-3 - Preparing the solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... known to offer significant subcontracting opportunities for small, small disadvantaged, and women-owned businesses or which include work previously performed by a small business. When used, this factor must be...

  8. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  9. 48 CFR 1319.705-4 - Reviewing the subcontracting plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... The contracting officer may obtain advice and recommendations from the SBA procurement center representative, the contracting activity's small business specialist and the DOC OSDBU. The CO shall give the...

  10. 49 CFR 22.11 - Eligibility criteria.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business with experience in the transportation industry and trade for which the STLP loan is sought; (5) Be...-executed transportation-related contract, subcontract, or purchase order held directly with DOT or with...

  11. A New Front in the Sweatshop Wars?

    ERIC Educational Resources Information Center

    Farrell, Elizabeth F.; Olsen, Florence

    2001-01-01

    Discusses how some prominent institutions prompt debate by subcontracting the labor-intensive work of putting documents online to vendors in developing countries. Libraries counter that contractors treat overseas employees well. (EV)

  12. THE ARMOUR DUST FUELED REACTOR (ADFR). Quarterly Progress Report No. 2 For the Period May 21, 1958 to August 21, 1958

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loewe, W.E.; Krucoff, D.

    1958-10-31

    Study of the ADFR concept included experimental work on fuel dust suspension stability and redispersibility, erosion, and dust deposition using the fuel dust circulation loop. Some theoretical work was done in the areas of reactor safety and breeding. (For preceding period -see AECU-3827.) (auth)

  13. Engineering and Physics Optimization of Breed and Burn Fast Reactor Systems; NUCLEAR ENERGY RESEARCH INITIATIVE (NERI) QUARTERLY PROGRESS REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pavel Hejzlar, Peter Yarsky, Mike Driscoll, Dan Wachs, Kevan Weaver, Ken Czerwinski, Mike Pope, James Parry, Theron D. Marshall, Cliff B. Davis, Dustin Crawford, Thomas Hartmann, Pradip Saha; Hejzlar, Pavel; Yarsky, Peter

    2005-01-31

    This project is organized under four major tasks (each of which has two or more subtasks) with contributions among the three collaborating organizations (MIT, INEEL and ANL-West): Task A: Core Physics and Fuel Cycle; Task B: Core Thermal Hydraulics; Task C: Plant Design; Task D: Fuel Design The lead PI, Michael J. Driscoll, has consolidated and summarized the technical progress submissions provided by the contributing investigators from all sites, under the above principal task headings.

  14. 48 CFR 47.504 - Exceptions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., such as agricultural and food-aid shipments; (2) Shipments covered under 46 U.S.C. Appx 1241-1, such as those generated by Export-Import Bank loans or guarantees; (3) Subcontracts under— (i) Government...

  15. Strontium-90 Error Discovered in Subcontract Laboratory Spreadsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. D. Brown A. S. Nagel

    1999-07-31

    West Valley Demonstration Project health physicists and environment scientists discovered a series of errors in a subcontractor's spreadsheet being used to reduce data as part of their strontium-90 analytical process.

  16. HTGR fuels and core development program. Quarterly progress report for the period ending August 31, 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1975-09-30

    Studies of reactions between core materials and coolant impurities, basic fission product transport mechanisms, core graphite development and testing, the development and testing of recyclable fuel systems, and physics and fuel management studies are described. Materials studies include irradiation capsule tests of both fuel and graphite. Experimental procedures and results are discussed and, where appropriate, the data are presented in tables, graphs, and photographs. (auth)

  17. State of the States: Fuel Cells in America 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtin, Sandra; Gangi, Jennifer

    2013-10-31

    This October 2013 report, written by Fuel Cells 2000 and partially funded by the U.S. Department of Energy's Fuel Cell Technologies Office, continues to build on the April 2010 State of the States report that provided a snapshot of fuel cell and hydrogen activity in the 50 states and District of Columbia. This update report provides more details on the progress and activities that happened since the third report, issued in August 2012.

  18. Advanced thermally stable jet fuels: Technical progress report, October 1994--December 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schobert, H.H.; Eser, S.; Song, C.

    There are five tasks within this project on thermally stable coal-based jet fuels. Progress on each of the tasks is described. Task 1, Investigation of the quantitative degradation chemistry of fuels, has 5 subtasks which are described: Literature review on thermal stability of jet fuels; Pyrolytic and catalytic reactions of potential endothermic fuels: cis- and trans-decalin; Use of site specific {sup 13}C-labeling to examine the thermal stressing of 1-phenylhexane: A case study for the determination of reaction kinetics in complex fuel mixtures versus model compound studies; Estimation of critical temperatures of jet fuels; and Surface effects on deposit formation inmore » a flow reactor system. Under Task 2, Investigation of incipient deposition, the subtask reported is Uncertainty analysis on growth and deposition of particles during heating of coal-derived aviation gas turbine fuels; under Task 3, Characterization of solid gums, sediments, and carbonaceous deposits, is subtask, Studies of surface chemistry of PX-21 activated carbon during thermal degradation of jet A-1 fuel and n-dodecane; under Task 4, Coal-based fuel stabilization studies, is subtask, Exploratory screening and development potential of jet fuel thermal stabilizers over 400 C; and under Task 5, Exploratory studies on the direct conversion of coal to high quality jet fuels, are 4 subtasks: Novel approaches to low-severity coal liquefaction and coal/resid co-processing using water and dispersed catalysts; Shape-selective naphthalene hydrogenation for production of thermally stable jet fuels; Design of a batch mode and a continuous mode three-phase reactor system for the liquefaction of coal and upgrading of coal liquids; and Exploratory studies on coal liquids upgrading using mesopores molecular sieve catalysts. 136 refs., 69 figs., 24 tabs.« less

  19. Year One Summary of X-energy Pebble Fuel Development at ORNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Helmreich, Grant W.; Hunn, John D.; McMurray, Jake W.

    2017-06-01

    The Advanced Reactor Concepts X-energy (ARC-Xe) Pebble Fuel Development project at Oak Ridge National Laboratory (ORNL) has successfully completed its first year, having made excellent progress in accomplishing programmatic objectives. The primary focus of research at ORNL in support of X-energy has been the training of X-energy fuel fabrication engineers and the establishment of US pebble fuel production capabilities able to supply the Xe-100 pebble-bed reactor. These efforts have been strongly supported by particle fuel fabrication and characterization expertise present at ORNL from the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program.

  20. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  1. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  2. 42 CFR 421.3 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... “intermediary” also means a Blue Cross plan that has entered into a subcontract approved by CMS with the Blue Cross and Blue Shield Association to perform intermediary functions. [71 FR 68228, Nov. 24, 2006] ...

  3. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... contract); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act...

  4. International Business Machines (IBM) Corporation Interim Agreement EPA Case No. 08-0113-00

    EPA Pesticide Factsheets

    On March 27, 2008, the United States Environmental Protection Agency (EPA), suspended International Business Machines (IBM) from receiving Federal Contracts, approved subcontracts, assistance, loans and other benefits.

  5. 48 CFR 226.370-8 - Goals and incentives for subcontracting with HBCU/MIs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Historically Black Colleges and Universities and Minority Institutions 226.370-8 Goals and incentives for... educational institutions. (b) The contracting officer may, when contracting by negotiation, use in...

  6. 78 FR 42391 - Small Business Subcontracting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-16

    ... for the Jobs Act was the belief that contracting officers and prime contractors are not reporting or... for making false claims. SBA notes that the requirements that apply in the construction arena do not...

  7. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  8. 48 CFR 11.601 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... et seq.) and critical infrastructure protection and restoration. (50 U.S.C. App. § 2152). Rated order means a prime contract, a subcontract, or a purchase order in support of an approved program issued in...

  9. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... which the apparently successful offeror received an evaluation credit for proposing one or more SDB... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  10. 36 CFR 14.9 - Terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... employees of the contractors, and to indemnify the United States against any liability for damages to life..., or national origin and shall require an identical provision to be included in all subcontracts. (l...

  11. 48 CFR 852.236-80 - Subcontracts and work coordination.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... immediately. In doing so, the contractor shall explain the proposed method of solving the problem or shall... problems and the installation of lines and equipment as contemplated by the contract documents while...

  12. 48 CFR 227.7102-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... processes. Do not require the contractor to include this clause in its subcontracts. (2) Use the clause at... for commercial items or commercial components. (c) Use the clause at 252.227-7037, Validation of...

  13. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to complete all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the second quarter (1/1/2013 to 3/31/2013), all the technical and legal documents for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. The revised CRADA documents were sent to DOE, Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for completing legal documents for the project. A non-disclosure agreement was revised and sent to all the parties for reviews.« less

  14. Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Quarterly Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nguyen, Ba Nghiep; Simmons, Kevin L.

    This quarterly report summarizes the status for the project planning to initiate all the legal and contract documents required for establishing the subcontracts needed and a Cooperative Research and Development Agreement (CRADA) with Autodesk, Inc., Toyota Motor Engineering and Manufacturing North America (Toyota), and Magna Exterior and Interiors Corporation (Magna). During the first quarter (10/1/2012 to 12/31/2012), the statements of work (SOW) for the subcontracts to Purdue University, University of Illinois, and PlastiComp, Inc. were completed. A draft of the CRADA SOW was sent to Autodesk, Toyota, and Magna for technical and legal reviews. PNNL Legal Services contacted project partners’more » Legal counterparts for preparing legal documents for the project. A non-disclosure agreement was drafted and sent to all the parties for reviews.« less

  15. Hydrogen System Component Validation | Hydrogen and Fuel Cells | NREL

    Science.gov Websites

    Meeting (June 2017) Hydrogen Component Validation: 2016 Annual Progress Report, Danny Terlip, Excerpt from the 2016 DOE Annual Progress Report (February 2017) Hydrogen Component Validation: 2016 Annual Merit Transportation Decisions, NREL Fact Sheet (June 2016) Hydrogen Component Validation: 2015 Annual Progress Report

  16. Thin-Film Solid Oxide Fuel Cells

    NASA Technical Reports Server (NTRS)

    Chen, Xin; Wu, Nai-Juan; Ignatiev, Alex

    2009-01-01

    The development of thin-film solid oxide fuel cells (TFSOFCs) and a method of fabricating them have progressed to the prototype stage. This can result in the reduction of mass, volume, and the cost of materials for a given power level.

  17. Aircraft Engine Technology for Green Aviation to Reduce Fuel Burn

    NASA Technical Reports Server (NTRS)

    Hughes, Christopher E.; VanZante, Dale E.; Heidmann, James D.

    2013-01-01

    The NASA Fundamental Aeronautics Program Subsonic Fixed Wing Project and Integrated Systems Research Program Environmentally Responsible Aviation Project in the Aeronautics Research Mission Directorate are conducting research on advanced aircraft technology to address the environmental goals of reducing fuel burn, noise and NOx emissions for aircraft in 2020 and beyond. Both Projects, in collaborative partnerships with U.S. Industry, Academia, and other Government Agencies, have made significant progress toward reaching the N+2 (2020) and N+3 (beyond 2025) installed fuel burn goals by fundamental aircraft engine technology development, subscale component experimental investigations, full scale integrated systems validation testing, and development validation of state of the art computation design and analysis codes. Specific areas of propulsion technology research are discussed and progress to date.

  18. Conversion of methanol-fueled 16-valve, 4-cylinder engine to operation on gaseous 2H2/CO fuel

    NASA Astrophysics Data System (ADS)

    Schaefer, Ronald M.; Hamady, Fakhart J.; Martin, James C.

    1992-09-01

    The report describes progress to date on a project to convert a Nissan CA18DE engine previously modified for operation on M100 neat methanol to operation on dissociated methanol (2H2/CO) gaseous fuel. This engine was operated on both M100 and simulated dissociated methanol (67 percent hydrocarbon and 33 percent carbon monoxide) fuels. This report describes recent modifications made to the engine and fuel delivery system and summarizes the results from recent testing.

  19. MARMOT update for oxide fuel modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Yongfeng; Schwen, Daniel; Chakraborty, Pritam

    This report summarizes the lower-length-scale research and development progresses in FY16 at Idaho National Laboratory in developing mechanistic materials models for oxide fuels, in parallel to the development of the MARMOT code which will be summarized in a separate report. This effort is a critical component of the microstructure based fuel performance modeling approach, supported by the Fuels Product Line in the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program. The progresses can be classified into three categories: 1) development of materials models to be used in engineering scale fuel performance modeling regarding the effect of lattice defects on thermal conductivity, 2) development of modeling capabilities for mesoscale fuel behaviors including stage-3 gas release, grain growth, high burn-up structure, fracture and creep, and 3) improved understanding in material science by calculating the anisotropic grain boundary energies in UOmore » $$_2$$ and obtaining thermodynamic data for solid fission products. Many of these topics are still under active development. They are updated in the report with proper amount of details. For some topics, separate reports are generated in parallel and so stated in the text. The accomplishments have led to better understanding of fuel behaviors and enhance capability of the MOOSE-BISON-MARMOT toolkit.« less

  20. Fuel Cell Buses in U.S. Transit Fleets: Current Status 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eudy, Leslie; Post, Matthew B

    This report, published annually, summarizes the progress of fuel cell electric bus (FCEB) development in the United States and discusses the achievements and challenges of introducing fuel cell propulsion in transit. The report provides a summary of results from evaluations performed by the National Renewable Energy Laboratory. This annual status report combines results from all FCEB demonstrations, tracks the progress of the FCEB industry toward meeting technical targets, documents the lessons learned, and discusses the path forward for commercial viability of fuel cell technology for transit buses. These data and analyses help provide needed information to guide future early-stage researchmore » and development. The 2017 summary results primarily focus on the most recent year for each demonstration, from August 2016 through July 2017. The primary results presented in the report are from five demonstrations of two different fuel-cell-dominant bus designs: Zero Emission Bay Area Demonstration Group led by Alameda-Contra Costa Transit District (AC Transit) in California; American Fuel Cell Bus (AFCB) Project at SunLine Transit Agency in California; AFCB Project at the University of California at Irvine; AFCB Project at Orange County Transportation Authority; and AFCB Project at Massachusetts Bay Transportation Authority.« less

  1. A spray flamelet/progress variable approach combined with a transported joint PDF model for turbulent spray flames

    NASA Astrophysics Data System (ADS)

    Hu, Yong; Olguin, Hernan; Gutheil, Eva

    2017-05-01

    A spray flamelet/progress variable approach is developed for use in spray combustion with partly pre-vaporised liquid fuel, where a laminar spray flamelet library accounts for evaporation within the laminar flame structures. For this purpose, the standard spray flamelet formulation for pure evaporating liquid fuel and oxidiser is extended by a chemical reaction progress variable in both the turbulent spray flame model and the laminar spray flame structures, in order to account for the effect of pre-vaporised liquid fuel for instance through use of a pilot flame. This new approach is combined with a transported joint probability density function (PDF) method for the simulation of a turbulent piloted ethanol/air spray flame, and the extension requires the formulation of a joint three-variate PDF depending on the gas phase mixture fraction, the chemical reaction progress variable, and gas enthalpy. The molecular mixing is modelled with the extended interaction-by-exchange-with-the-mean (IEM) model, where source terms account for spray evaporation and heat exchange due to evaporation as well as the chemical reaction rate for the chemical reaction progress variable. This is the first formulation using a spray flamelet model considering both evaporation and partly pre-vaporised liquid fuel within the laminar spray flamelets. Results with this new formulation show good agreement with the experimental data provided by A.R. Masri, Sydney, Australia. The analysis of the Lagrangian statistics of the gas temperature and the OH mass fraction indicates that partially premixed combustion prevails near the nozzle exit of the spray, whereas further downstream, the non-premixed flame is promoted towards the inner rich-side of the spray jet since the pilot flame heats up the premixed inner spray zone. In summary, the simulation with the new formulation considering the reaction progress variable shows good performance, greatly improving the standard formulation, and it provides new insight into the local structure of this complex spray flame.

  2. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  3. 4 CFR 21.13 - Nonstatutory protests.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...) GAO will consider protests concerning awards of subcontracts by or for a Federal agency, sales by a... suspension of contract performance, 31 U.S.C. 3553(c) and (d), also does not apply to nonstatutory protests. ...

  4. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  5. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  6. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  7. 48 CFR 52.222-11 - Subcontracts (Labor Standards).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... clause, means all types of work done by laborers and mechanics employed by the construction Contractor or... Compensation (if the clause is included in this contract); (3) Apprentices and Trainees; (4) Payrolls and Basic...

  8. 48 CFR 52.204-10 - Reporting Executive Compensation and First-Tier Subcontract Awards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123...

  9. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  10. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  11. 48 CFR 19.703 - Eligibility requirements for participating in the program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... proposing one or more SDB subcontractors, the contracting officer or the SBA may protest the disadvantaged... subcontracting goals for small business and small disadvantaged business (SDB) concerns, regardless of the size...

  12. 13 CFR 125.6 - Prime contractor performance requirements (limitations on subcontracting).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a concern has claimed a 10 percent small disadvantaged business (SDB) price evaluation preference, a... would promote the purposes of the small business, 8(a), SDB, woman-owned business, or HUBZone programs...

  13. 48 CFR 252.225-7046 - Exports by Approved Community Members in Response to the Solicitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all applicable International Traffic in Arms Regulations (ITAR) requirements, including any criminal.../Title of Duly Authorized RepresentativeDate (h) Subcontracts. The offeror shall flow down the substance...

  14. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  15. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  16. 7 CFR 2500.049 - Prior approvals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... detailed budget for the subcontract must be submitted to the ADO. (b) No-cost extensions of time—(1... being requested; and signature of the AOR and the PD. (3) Requests for no-cost extensions of time after...

  17. 48 CFR 212.7002-2 - Subcontracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-2... production of an item or process begun as a prototype project under an other transaction agreement or as a...

  18. Advanced Gas Turbine (AGT)

    NASA Technical Reports Server (NTRS)

    1983-01-01

    The development and progress of the Advanced Gas Turbine engine program is examined. An analysis of the role of ceramics in the design and major engine components is included. Projected fuel economy, emissions and performance standards, and versatility in fuel use are also discussed.

  19. Balloon-Borne Observations of the Polarization of the Cosmic Microwave Background

    NASA Technical Reports Server (NTRS)

    2003-01-01

    This final report is confined to the sub-contract to Caltech, and does not cover work at the PI institution (PI John Ruhl, Case Western Reserve University). In our original proposal, we planned to fly BOOMERANG twice, in the 2000 / 2001 and 2002 / 2003 Austral LDB seasons. The first flight was to have used a newly developed detector technology: the Polarization Sensitive Bolometer (PSB). The second flight was to have used a yet more sophisticated technology: a polarization sensitive, antenna-coupled array (CAMWA). The development of both technologies proceeded more slowly than anticipated. In the end, we were successful in developing the PSB technology to maturity, integrating it into the payload, and flying the payload once during the 2002/2003 Austral season. The payload performed well during this flight, and analysis of the data is in progress. As originally proposed, we have also continued to work on analysis of the data from the 1998 flight, and several publications have resulted. Sufficient progress has been made on the CAMWA technology that we expect to be able to field it into an instrument in 2 to 3 years. However, ground-based telescopes now appear to be a more attractive platform for CMB polarimetry, owing to the longer integration times available. We thus anticipate first implementing CAMWA on a ground-based telescope at South Pole.

  20. Progress in Developing a New 5 Kilowatt Free-Piston Stirling Space Convertor

    NASA Astrophysics Data System (ADS)

    Brandhorst, Henry W.; Kirby, Raymond L.; Chapman, Peter A.

    2008-01-01

    The NASA Vision for Exploration of the Moon envisions a nuclear reactor coupled with a free-piston Stirling convertor at a power level of 30-40 kWe. In the 1990s, Mechanical Technology, Inc.'s Stirling Engine Systems Division (now a part of Foster-Miller, Inc.) developed a 25 kWe free piston Stirling Space Power Demonstrator Engine under the SP-100 program. This system consisted of two 12.5 kWe engines connected at their hot ends and mounted in tandem to cancel vibration. Recently, NASA and DoE have been developing dual 55 We and 80 We Stirling convertor systems for use with radioisotope heat sources. Total test times of all convertors in this effort exceed 120,000 hours. Recently, NASA began a new project with Auburn University to develop a 5 kWe, single convertor for use in the Lunar power system. Goals of this development program include a specific power in excess of 140 We/kg at the convertor level, lifetime in excess of five years and a control system that will safely manage the convertors in case of an emergency. Auburn University awarded a subcontract to Foster-Miller, Inc. to undertake development of the 5 kWe Stirling Convertor Assembly. The characteristics of the design along with progress in developing the system will be described.