Sample records for full-depth reclamation

  1. Developing standards and specifications for full depth pavement reclamation.

    DOT National Transportation Integrated Search

    2012-05-25

    The report summarizes the work conducted during the development of procedures for conducting full depth reclamation of existing asphalt surfaced and unsurfaced roads. The report describes full depth reclamation, and includes a summary of available li...

  2. Structural evaluation of asphalt pavements with full-depth reclaimed base.

    DOT National Transportation Integrated Search

    2012-12-01

    Currently, MnDOT pavement design recommends granular equivalency, GE = 1.0 for non-stabilized full-depth : reclamation (FDR) material, which is equivalent to class 5 material. For stabilized full-depth reclamation (SFDR), : there was no guideline for...

  3. Full depth reclamation : workshop materials.

    DOT National Transportation Integrated Search

    2011-01-01

    Rehabilitating an old pavement by pulverizing and stabilizing the existing pavement is a process referred to as Full Depth Reclamation (FDR). This process shows great potential as an economical rehabilitation alternative that provides deep structural...

  4. Field and laboratory investigations for full depth reclamation projects.

    DOT National Transportation Integrated Search

    2011-03-01

    Full-depth reclamation (FDR) offers a timely, cost-effective solution to restore a pavements condition. : However, FDR represents only one technique in the engineers toolkit available for addressing deteriorating : pavement conditions. The purp...

  5. Best practices for full-depth reclamation using asphalt emulsions.

    DOT National Transportation Integrated Search

    2015-07-01

    Full depth reclamation of asphalt pavements using asphalt emulsions (AEFDR) is a process that recycles and rejuvenates the existing : asphalt pavement surface, base, and, sometimes, the subgrade, providing an improved underlying structure for the new...

  6. Full-depth reclamation : new test procedures and recommended updates to specifications.

    DOT National Transportation Integrated Search

    2012-07-01

    Rehabilitating an old pavement by pulverizing and stabilizing the existing pavement is a process referred to : as Full Depth Reclamation (FDR). The stabilized layer becomes either the base or sub-base of the new : pavement structure. This process has...

  7. Construction monitoring of full-depth reclamation in Madison County for MDOT project No. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2011-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  8. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  9. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032)

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  10. In-Place Recycling and Reclamation of Asphaltic Concrete Pavements in Kentucky

    DOT National Transportation Integrated Search

    2017-11-01

    Full-depth reclamation has been defined by the Asphalt Recycling and Reclaiming Association as a rehabilitation technique in which the full thickness of the asphalt pavement and a predetermined portion of the underlying material (base, subbase, an...

  11. Full depth reclamation with cement, fourth interim, December 2009.

    DOT National Transportation Integrated Search

    2009-12-01

    Due to the rising cost of virgin aggregate and asphalt products the Maine Department of Transportation : (MaineDOT) utilizes a number of reconstruction and rehabilitation processes to cost effectively maintain : Maines highway system. One rehabili...

  12. Full depth reclamation with cement, second and third interim, December, 2008.

    DOT National Transportation Integrated Search

    2008-12-01

    Due to the rising cost of virgin aggregate and asphalt products the Maine Department of Transportation : (MaineDOT) utilizes a number of reconstruction and rehabilitation processes to cost effectively maintain : Maines highway system. One rehabili...

  13. Potential benefits of adding emulsion to full depth reclamation material.

    DOT National Transportation Integrated Search

    2004-09-01

    Roughly 40% of MaineDOTs highway network is not built to state standards and is in need of : reconstruction or rehabilitation. To maintain these highways the Department has been utilizing lower cost : improvements until funding is available to reb...

  14. Assessment of design parameters and construction requirements for full depth reclamation projects with cement.

    DOT National Transportation Integrated Search

    2015-02-01

    The ability to efficiently rehabilitate and maintain the State of Vermonts Highway infrastructure in a : cost-effective manner is a daunting task. Historically, pavement overlay treatments were specified : because it was a rapid low cost solution ...

  15. 43 CFR 426.25 - Reclamation audits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation audits. 426.25 Section 426.25... INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.25 Reclamation audits. Reclamation will conduct... reviews; (b) In-depth reviews; and (c) Audits. ...

  16. Potential benefits of adding emulsion to reclaimed base material : interim report - fourth year.

    DOT National Transportation Integrated Search

    2003-05-01

    Rehabilitation of deteriorated asphalt pavements has become one of the primary tools utilized by the : Maine Department of Transportation (MDOT). One method used to achieve this task is the use of full : depth reclamation (FDR). : In an effort to imp...

  17. Rehabilitating asphalt highways

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butalia, T.S.

    2007-07-01

    Coal fly ash has been used on two Ohio full-depth reclamation projects in Delaware and Warren. The object of the project carried out with the Department of Civil and Environmental Engineering and Geodetic Science at Ohio State University is to demonstrate the effective use of Class fly ash in combination with lime or lime kiln dust in the full depth reclamation of asphalt pavements. The article describes the mixes used for the highway reconstruction of part of Section Line Road Delaware County and of a road in Warren County. During construction the pavement sections were instrumented with several structural andmore » environmental monitoring devices and data is being collected on a quarterly basis. Falling Weight Deflectometer (FWD) tests to measure load defection behaviour, resilient of pavement layers and soil and base structural layer coefficient are being carried out twice a year. It was shown that use of fly ash increased the elastic modulus of base layers. This article first appeared in the Feb/May 2007 issue of Asphalt Contractor. 4 photos.« less

  18. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade.

    DOT National Transportation Integrated Search

    2002-02-01

    Maine has a variety of soil types throughout the state. Most of these soil types degrade rapidly and have : poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of existing s...

  19. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade : final report.

    DOT National Transportation Integrated Search

    2009-03-01

    Maine has a variety of soil types throughout the state. A majority of these soil types degrade rapidly and : have poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of exis...

  20. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade : interim report - first year, December 2003.

    DOT National Transportation Integrated Search

    2003-12-01

    Maine has a variety of soil types throughout the state. Most of these soil types degrade rapidly and have : poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of existing s...

  1. Using foamed asphalt as a stabilizing agent in full depth reclamation of Route 8 in Belgrade : interim report - third and fourth year, October 2006.

    DOT National Transportation Integrated Search

    2006-10-01

    Maine has a variety of soil types throughout the state. A majority of these soil types degrade rapidly and : have poor stability. To eliminate the cost of supplying quality road base material from a distant source and : increase the stability of exis...

  2. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404...

  3. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will...

  4. Below-ground attributes on reclaimed surface minelands over a 40-year chronosequence

    NASA Astrophysics Data System (ADS)

    Limb, Ryan; Bohrer, Stefanie; Volk, Jay

    2017-04-01

    Reclamation following mining activities often aims to restore stable soils that support productive and diverse native plant communities. The soil re-spread process increases soil compaction, which may alter soil water, plant composition, rooting depths and soil organic matter. This may have a direct impact on vegetation establishment and species recruitment. Seasonal wet/dry and freeze/thaw patterns are thought to alleviate soil compaction over time. However, this has not been formally evaluated on reclaimed landscapes at large scales. Our objectives were to (1) determine soil compaction alleviation, (2) rooting depth and (3) spatial patterns of soil water content over a time-since-reclamation gradient. Soil resistance to penetration varied by depth, with shallow compaction remaining unchanged, but deeper compaction increased over time rather than being alleviated. Root biomass and depth did not increase with time and was consistently less than reference locations. Plant communities initially had a strong native component, but quickly became dominated by invasive species following reclamation and soil water content became increasingly homogeneous over the 40-year chronosequence. Seasonal weather patterns and soil organic matter additions can reduce soil compaction if water infiltration is not limited. Shallow and strongly fibrous-rooted grasses present in reclaimed sites added organic matter to shallow soil layers, but did not penetrate the compacted layers and allow water infiltration. Strong linkages between land management strategies, soil properties and vegetation composition can advance reclamation efforts and promote heterogeneous landscapes. However, current post-reclamation management strategies are not facilitating natural seasonal weather patterns to reducing soil compaction.

  5. Potential methane production and oxidation in soil reclamation covers of an oil sands mining site in Alberta, Canada

    NASA Astrophysics Data System (ADS)

    Pum, Lisa; Reichenauer, Thomas; Germida, Jim

    2015-04-01

    Anthropogenic activities create a number of significant greenhouse gases and thus potentially contribute to global warming. Methane production is significant in some agricultural production systems and from wetlands. In soil, methane can be oxidised by methanotrophic bacteria. However, little is known about methane production and oxidation in oil sand reclamation covers. The purpose of this study was to investigate methane production and oxidation potential of tailing sands and six different reclamation layers of oil sands mining sites in Alberta, Canada. Methane production and oxidation potential were investigated in laboratory scale microcosms through continuous headspace analysis using gas chromatography. Samples from a reclamation layer were collected at the Canadian Natural Resources Limited (CNRL) reclamation site at depths of 0-10 cm, 10-20 cm and 20-40 cm in October 2014. In addition, tailing sands provided by Suncor Energy Inc. and soil from a CNRL wetland were studied for methane production. Samples were dried, crushed and sieved to 4 mm, packed into serum bottle microcosms and monitored for eight weeks. Methane production potential was assessed by providing an anoxic environment and by adjusting the samples to a moisture holding capacity of 100 %. Methane oxidation potential was examined by an initial application of 2 vol % methane to the microcosms and by adjusting the samples to a moisture holding capacity of 50 %. Microcosm headspace gas was analysed for methane, carbon dioxide, nitrous oxide and oxygen. All experiments were carried out in triplicates, including controls. SF6 and Helium were used as internal standards to detect potential leaks. Our results show differences for methane production potential between the soil depths, tailing sands and wetlands. Moreover, there were differences in the methane oxidation potential of substrate from the three depths investigated and between the reclamation layers. In conclusion, the present study shows that reclamation layers for oil sands mining sites in Alberta, Canada have the potential to oxidize on-site produced methane emissions to the less harmful greenhouse gas carbon dioxide. Such oxidation might mitigate impacts of methane production from these sites.

  6. 43 CFR 404.17 - How will Reclamation evaluate my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.17... proposed rural water supply project is eligible for further consideration through a full proposal; (b) If...

  7. Quantification of intensive hybrid coastal reclamation for revealing its impacts on macrozoobenthos

    NASA Astrophysics Data System (ADS)

    Yan, Jiaguo; Cui, Baoshan; Zheng, Jingjing; Xie, Tian; Wang, Qing; Li, Shanze

    2015-01-01

    Managing and identifying the sources of anthropogenic stress in coastal wetlands requires an in-depth understanding of relationships between species diversity and human activities. Empirical and experimental studies provide clear evidence that coastal reclamation can have profound impacts on marine organisms, but the focus of such studies is generally on comparative or laboratory research. We developed a compound intensity index (reclamation intensity index, RI) on hybrid coastal reclamation, to quantify the impacts of reclamation on coastal ecosystems. We also made use of mean annual absolute changes to a number of biotic variables (biodiversity, species richness, biomass of total macrozoobenthos, and species richness and biomass of Polychaeta, Mollusca, Crustacea, and Echinodermata) to determine Hedges’d index, which is a measure of the potential effects of coastal reclamation. Our results showed that there was significant difference of coastal reclamation intensity between Yellow Sea, East China Sea and South China Sea, the biological changes in effect sizes of the three regions differed greatly over time. Our modelling analyses showed that hybrid coastal reclamation generally had significant negative impacts on species diversity and biomass of macrozoobenthos. These relationships varied among different taxonomic groups and included both linear and nonlinear relationships. The results indicated that a high-intensity of coastal reclamation contributed to a pronounced decline in species diversity and biomass, while lower-intensity reclamation, or reclamation within certain thresholds, resulted in a small increase in species diversity and biomass. These results have important implications for biodiversity conservation and the ecological restoration of coastal wetlands in face of the intensive reclamation activities.

  8. Reclamation and the Red Man: Relationships on the Truckee-Carson Project, Nevada

    ERIC Educational Resources Information Center

    Townley, John M.

    1978-01-01

    Four years after selection of the Western Nevada area for development as a federally-administered reclamation project, and but a single full season of farming, the Indian situation had assumed problem proportions to the Reclamation Service and the Truckee-Carson Project. (NQ)

  9. Unexpected hydrologic perturbation in an abandoned underground coal mine: Response to surface reclamation?

    USGS Publications Warehouse

    Harper, D.; Olyphant, G.A.; Hartke, E.J.

    1990-01-01

    A reclamation project at the abandoned Blackhawk Mine site near Terre Haute, Indiana, lasted about four months and involved the burial of coarse mine refuse in shallow (less than 9 m) pits excavated into loess and till in an area of about 16 ha. An abandoned flooded underground coal mine underlies the reclamation site at a depth of about 38 m; the total area underlain by the mine is about 10 km2. The potentiometric levels associated with the mine indicate a significant (2.7 m) and prolonged perturbation of the deeper confined groundwater system; 14 months after completing reclamation, the levels began to rise linearly (at an average rate of 0.85 cm/d) for 11 months, then fell exponentially for 25 months, and are now nearly stable. Prominent subsidence features exist near the reclamation site. Subsidence-related fractures were observed in cores from the site, and such fractures may have provided a connection between the shallower and deeper groundwater systems. ?? 1990 Springer-Verlag New York Inc.

  10. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-04-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  11. Effect of reclamation on soil organic carbon pools in coastal areas of eastern China

    NASA Astrophysics Data System (ADS)

    Li, Jianguo; Yang, Wenhui; Li, Qiang; Pu, Lijie; Xu, Yan; Zhang, Zhongqi; Liu, Lili

    2018-06-01

    The coastal wetlands of eastern China form one of the most important carbon sinks in the world. However, reclamation can significantly alter the soil carbon pool dynamics in these areas. In this study, a chronosequence was constructed for four reclamation zones in Rudong County, Jiangsu Province, eastern China (reclaimed in 1951, 1974, 1982, and 2007) and a reference salt marsh to identify both the process of soil organic carbon (SOC) evolution, as well as the effect of cropping and soil properties on SOC with time after reclamation. The results show that whereas soil nutrient elements and SOC increased after reclamation, the electrical conductivity of the saturated soil extract (ECe), pH, and bulk density decreased within 62 years following reclamation and agricultural amendment. In general, the soil's chemical properties remarkably improved and SOC increased significantly for approximately 30 years after reclamation. Reclamation for agriculture (rice and cotton) significantly increased the soil organic carbon density (SOCD) in the top 60 cm, especially in the top 0-30 cm. However, whereas the highest concentration of SOCD in rice-growing areas was in the top 0-20 cm of the soil profile, it was greater at a 20-60 cm depth in cottongrowing areas. Reclamation also significantly increased heavy fraction organic carbon (HFOC) levels in the 0-30 cm layer, thereby enhancing the stability of the soil carbon pool. SOC can thus increase significantly over a long time period after coastal reclamation, especially in areas of cultivation, where coastal SOC pools in eastern China tend to be more stable.

  12. 43 CFR 404.20 - What information must I include in my full proposal to conduct an appraisal or a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.20 What information must I include in my full proposal to conduct an...

  13. Cost comparison of full-scale water reclamation technologies with an emphasis on membrane bioreactors.

    PubMed

    Iglesias, Raquel; Simón, Pedro; Moragas, Lucas; Arce, Augusto; Rodriguez-Roda, Ignasi

    2017-06-01

    The paper assesses the costs of full-scale membrane bioreactors (MBRs). Capital expenditures (CAPEX) and operating expenses (OPEX) of Spanish MBR facilities have been verified and compared to activated sludge plants (CAS) using water reclamation treatment (both conventional and advanced). Spanish MBR facilities require a production of 0.6 to 1.2 kWh per m 3 , while extended aeration (EA) and advanced reclamation treatment require 1.2 kWh per m 3 . The energy represents around 40% of the OPEX in MBRs. In terms of CAPEX, the implementation costs of a CAS facility followed by conventional water reclamation treatment (physical-chemical + sand filtration + disinfection) ranged from 730 to 850 €.m -3 d, and from 1,050 to 1,250 €.m -3 d in the case of advanced reclamation treatment facilities (membrane filtration) with a capacity of 8,000 to 15,000 m 3 d -1 . The MBR cost for similar capacities ranges between 700 and 960 €.m -3 d. This study shows that MBRs that have been recently installed represent a cost competitive option for water reuse applications for medium and large capacities (over 10,000 m 3 d -1 ), with similar OPEX to EA and conventional water reclamation treatment. In terms of CAPEX, MBRs are cheaper than EA, followed by advanced water reclamation treatment.

  14. 76 FR 40649 - Indiana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... at 312 IAC 25-6-30 Surface mining; explosives; general requirements. The full text of the program... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 914... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed...

  15. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., rate and frequency of rainfall and runoff, surface roughness, slope and vegetative cover, infiltration... the function of storing water, such as permeability, infiltration, porosity, depth and direction of...

  16. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., rate and frequency of rainfall and runoff, surface roughness, slope and vegetative cover, infiltration... the function of storing water, such as permeability, infiltration, porosity, depth and direction of...

  17. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., rate and frequency of rainfall and runoff, surface roughness, slope and vegetative cover, infiltration... the function of storing water, such as permeability, infiltration, porosity, depth and direction of...

  18. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., rate and frequency of rainfall and runoff, surface roughness, slope and vegetative cover, infiltration... the function of storing water, such as permeability, infiltration, porosity, depth and direction of...

  19. 30 CFR 785.19 - Surface coal mining and reclamation operations on areas or adjacent to areas including alluvial...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., rate and frequency of rainfall and runoff, surface roughness, slope and vegetative cover, infiltration... the function of storing water, such as permeability, infiltration, porosity, depth and direction of...

  20. Demonstration of a full-scale plant using an UASB followed by a ceramic MBR for the reclamation of industrial wastewater.

    PubMed

    Niwa, Terutake; Hatamoto, Masashi; Yamashita, Takuya; Noguchi, Hiroshi; Takase, Osamu; Kekre, Kiran A; Ang, Wui Seng; Tao, Guihe; Seah, Harry; Yamaguchi, Takashi

    2016-10-01

    This study comprehensively evaluated the performance of a full-scale plant (4550m(3)d(-1)) using a UASB reactor followed by a ceramic MBR for the reclamation and reuse of mixed industrial wastewater containing many inorganics, chemical, oil and greases. This plant was demonstrated as the first full-scale system to reclaim the mixed industrial wastewater in the world. During 395days of operation, influent chemical oxygen demand (COD) fluctuated widely, but this system achieved COD removal rate of 91% and the ceramic MBR have operated flux of 21-25LMH stably. This means that this system adsorbed the feed water fluctuation and properly treated the water. Energy consumption of this plant was achieved 0.76kWhmm(-3) and this value is same range of domestic sewage MBR system. The combination of an UASB reactor and ceramic MBR is the most economical and feasible solution for water reclamation of mixed industrial wastewater. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. A decision support system using analytical hierarchy process (AHP) for the optimal environmental reclamation of an open-pit mine

    NASA Astrophysics Data System (ADS)

    Bascetin, A.

    2007-04-01

    The selection of an optimal reclamation method is one of the most important factors in open-pit design and production planning. It also affects economic considerations in open-pit design as a function of plan location and depth. Furthermore, the selection is a complex multi-person, multi-criteria decision problem. The group decision-making process can be improved by applying a systematic and logical approach to assess the priorities based on the inputs of several specialists from different functional areas within the mine company. The analytical hierarchy process (AHP) can be very useful in involving several decision makers with different conflicting objectives to arrive at a consensus decision. In this paper, the selection of an optimal reclamation method using an AHP-based model was evaluated for coal production in an open-pit coal mine located at Seyitomer region in Turkey. The use of the proposed model indicates that it can be applied to improve the group decision making in selecting a reclamation method that satisfies optimal specifications. Also, it is found that the decision process is systematic and using the proposed model can reduce the time taken to select a optimal method.

  2. Elucidating carbon sources driving microbial metabolism during oil sands reclamation.

    PubMed

    Bradford, Lauren M; Ziolkowski, Lori A; Goad, Corey; Warren, Lesley A; Slater, Gregory F

    2017-03-01

    Microbial communities play key roles in remediation and reclamation of contaminated environments via biogeochemical cycling of organic and inorganic components. Understanding the trends in in situ microbial community abundance, metabolism and carbon sources is therefore a crucial component of effective site management. The focus of this study was to use radiocarbon analysis to elucidate the carbon sources driving microbial metabolism within the first pilot wetland reclamation project in the Alberta oil sands region where the observation of H 2 S had indicated the occurrence of microbial sulphate reduction. The reclamation project involved construction of a three compartment system consisting of a freshwater wetland on top of a sand cap overlying a composite tailings (CT) deposit. Radiocarbon analysis demonstrated that both dissolved and sediment associated organic carbon associated with the deepest compartments (the CT and sand cap) was primarily fossil (Δ 14 C = -769 to -955‰) while organic carbon in the overlying peat was hundreds to thousands of years old (Δ 14 C = -250 to -350‰). Radiocarbon contents of sediment associated microbial phospholipid fatty acids (PLFA) were consistent with the sediment bulk organic carbon pools (Peat: Δ 14 C PLFA  = -257‰; Sand cap Δ 14 C PLFA  = -805‰) indicating that these microbes were using sediment associated carbon. In contrast, microbial PLFA grown on biofilm units installed in wells within the deepest compartments contained much more modern carbon that the associated bulk carbon pools. This implied that the transfer of relatively more modern carbon was stimulating the microbial community at depth within the system. Correlation between cellular abundance estimates based on PLFA concentrations and the Δ 14 C PLFA indicated that the utilization of this more modern carbon was stimulating the microbial community at depth. These results highlight the importance of understanding the occurrence and potential outcomes of the introduction of relatively bioavailable carbon to mine wastes in order to predict and manage the performance of reclamation strategies. Copyright © 2016 Elsevier Ltd. All rights reserved.

  3. Heavy metal fractions and ecological risk assessment in sediments from urban, rural and reclamation-affected rivers of the Pearl River Estuary, China.

    PubMed

    Zhang, Guangliang; Bai, Junhong; Xiao, Rong; Zhao, Qingqing; Jia, Jia; Cui, Baoshan; Liu, Xinhui

    2017-10-01

    Rapid urbanization and reclamation processes in coastal areas have resulted in serious pollution to the aquatic environment. Less is known on the geochemical fractions and ecological risks in river sediment under various human activities pressures, which is essential for addressing the connections between heavy metal pollution and anthropogenic influences. River sediments were collected from different landscapes (i.e., urban, rural and reclamation areas) to investigate the impacts of urbanization and reclamation on the metallic pollution levels and ecological risks in the Pear River Estuary of China. Results showed that Cd, Zn and Cu with high total contents and geoaccumulation index (I geo ) were the primary metals in the Peal River sediments. Generally, urban river sediments, especially the surface sediment layer (0-10 cm), exhibited higher metallic pollution levels. As for geochemical fractions, reducible and residual fractions were the dominant forms for six determined metals. And the percentage of heavy metals bound to Fe-Mn oxides decreased with increasing soil depth but the reverse tendency was observed for residual fractions. Compared with rural river sediments, heavy metals were highly associated with the exchangeable and carbonate fractions in both urban and reclamation-affected river sediments, suggesting that anthropogenic activities mainly increased the active forms of metals. Approximately 80% of Cd existed in the non-residual fraction and posed medium to high ecological risk according to the risk assessment code (RAC) values. The redundancy analysis (RDA) revealed that both urbanization and reclamation processes would cause similar metallic characteristics, and sediment organic matter (SOC) might be the prominent influencing factor. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Equivalency testing of ultraviolet disinfection for wastewater reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oppenheimer, J.A.; Jacangelo, J.G.; Laine, J.M.

    1996-11-01

    UV light disinfection was shown to continuously provide microbial inactivation equivalent to chlorine while reducing the formation of known carcinogenic disinfection by-products and the formation of chronic whole effluent toxicity. This was the first study to demonstrate UV`s performance relative to chlorination over an extended timeframe at a full-scale facility treating to meet the most stringent California reclamation standards.

  5. Surface coal mine land reclamation using a dry flue gas desulfurization product: Short-term and long-term water responses.

    PubMed

    Chen, Liming; Stehouwer, Richard; Tong, Xiaogang; Kost, Dave; Bigham, Jerry M; Dick, Warren A

    2015-09-01

    Abandoned coal-mined lands are a worldwide concern due to their potential negative environmental impacts, including erosion and development of acid mine drainage. A field study investigated the use of a dry flue gas desulfurization product for reclamation of abandoned coal mined land in USA. Treatments included flue gas desulfurization product at a rate of 280 Mg ha(-1) (FGD), FGD at the same rate plus 112 Mg ha(-1) yard waste compost (FGD/C), and conventional reclamation that included 20 cm of re-soil material plus 157 Mg ha(-1) of agricultural limestone (SOIL). A grass-legume sward was planted after treatment applications. Chemical properties of surface runoff and tile water (collected from a depth of 1.2m below the ground surface) were measured over both short-term (1-4 yr) and long-term (14-20 yr) periods following reclamation. The pH of surface runoff water was increased from approximately 3, and then sustained at 7 or higher by all treatments for up to 20 yr, and the pH of tile flow water was also increased and sustained above 5 for 20 yr. Compared with SOIL, concentrations of Ca, S and B in surface runoff and tile flow water were generally increased by the treatments with FGD product in both short- and long-term measurements and concentrations of the trace elements were generally not statistically increased in surface runoff and tile flow water over the 20-yr period. However, concentrations of As, Ba, Cr and Hg were occasionally elevated. These results suggest the use of FGD product for remediating acidic surface coal mined sites can provide effective, long-term reclamation. Copyright © 2015. Published by Elsevier Ltd.

  6. Organochlorine pesticides (OCPs) in wetland soils under different land uses along a 100-year chronosequence of reclamation in a Chinese estuary

    PubMed Central

    Bai, Junhong; Lu, Qiongqiong; Zhao, Qingqing; Wang, Junjing; Gao, Zhaoqin; Zhang, Guangliang

    2015-01-01

    Soil profiles were collected at a depth of 30 cm in ditch wetlands (DWs), riverine wetlands (RiWs) and reclaimed wetlands (ReWs) along a 100-year chronosequence of reclamation in the Pearl River Delta. In total, 16 OCPs were measured to investigate the effects of wetland reclamation and reclamation history on OCP levels. Our results showed that average ∑DDTs, HCB, MXC, and ∑OCPs were higher in surface soils of DWs compared to RiWs and ReWs. Both D30 and D20 soils contained the highest ∑OCP levels, followed by D40 and D100 soils; lower ∑OCP levels occurred in D10 soils. Higher ∑OCP levels were observed in the younger RiWs than in the older ones, and surface soils exhibited higher ∑OCP concentrations in the older ReWs compared with younger ReWs. The predominant percentages of γ-HCH in ∑HCHs (>42%) and aldrin in ∑DRINs (>46%) in most samples reflected the recent use of lindane and aldrin. The presence of dominant DDT isomers (p,p’-DDE and p,p’-DDD) indicated the historical input of DDT and significant aerobic degradation of the compound. Generally, DW soils had a higher ecotoxicological risk of OCPs than RiW and ReW soils, and the top 30 cm soils had higher ecotoxicological risks of HCHs than of DDTs. PMID:26633149

  7. Organochlorine pesticides (OCPs) in wetland soils under different land uses along a 100-year chronosequence of reclamation in a Chinese estuary

    NASA Astrophysics Data System (ADS)

    Bai, Junhong; Lu, Qiongqiong; Zhao, Qingqing; Wang, Junjing; Gao, Zhaoqin; Zhang, Guangliang

    2015-12-01

    Soil profiles were collected at a depth of 30 cm in ditch wetlands (DWs), riverine wetlands (RiWs) and reclaimed wetlands (ReWs) along a 100-year chronosequence of reclamation in the Pearl River Delta. In total, 16 OCPs were measured to investigate the effects of wetland reclamation and reclamation history on OCP levels. Our results showed that average ∑DDTs, HCB, MXC, and ∑OCPs were higher in surface soils of DWs compared to RiWs and ReWs. Both D30 and D20 soils contained the highest ∑OCP levels, followed by D40 and D100 soils; lower ∑OCP levels occurred in D10 soils. Higher ∑OCP levels were observed in the younger RiWs than in the older ones, and surface soils exhibited higher ∑OCP concentrations in the older ReWs compared with younger ReWs. The predominant percentages of γ-HCH in ∑HCHs (>42%) and aldrin in ∑DRINs (>46%) in most samples reflected the recent use of lindane and aldrin. The presence of dominant DDT isomers (p,p’-DDE and p,p’-DDD) indicated the historical input of DDT and significant aerobic degradation of the compound. Generally, DW soils had a higher ecotoxicological risk of OCPs than RiW and ReW soils, and the top 30 cm soils had higher ecotoxicological risks of HCHs than of DDTs.

  8. Spatiotemporal heterogeneity in densities of the Taiwanese humpback dolphin (Sousa chinensis taiwanensis)

    NASA Astrophysics Data System (ADS)

    Dares, Lauren E.; Araújo-Wang, Claryana; Yang, Shih Chu; Wang, John Y.

    2017-03-01

    The inshore, estuarine distribution of Taiwanese humpback dolphins (THD) along the west coast of Taiwan puts them in direct conflict with many anthropogenic activities. We investigated the influence of environmental factors (depth, sea surface temperature (SST), salinity and distance to the nearest freshwater source) and coastal developments on THD density. Clear heterogeneity in density was found across the range of the THD, and there was significant spatial and temporal variation in mean densities. Density was not directly related to any environmental factors examined, which may be due to temporal variability and hydrological and oceanographic conditions that create, in effect, a continuous river delta along the central west coast of Taiwan rather than isolated, separate river estuaries. A high abundance of dolphins per unit of survey effort (DPUE) and mother-calf pairs per unit of survey effort (MCPUE) were found in waters adjacent to major coastal developments in which shallow waters had been filled to create new land (reclamation areas), but neither distance to reclamation area nor distance to the nearest river were found to be significant predictors of density. Most reclamation projects in THD habitat are situated near the mouths of major rivers or result in the creation of artificial confluences of smaller rivers, streams and other freshwater outlets, such as waste outflows. Thus, dolphins appear to use these areas in the absence of high quality natural habitat that has been lost to large-scale coastal reclamation throughout their range.

  9. The effect of soil biodiversity on soil quality after agricultural reclamation at the eastern coast of China

    NASA Astrophysics Data System (ADS)

    Wang, Xiaohan; Yang, Jianghua; Pu, Lijie; Chen, Xinjian

    2017-04-01

    Large area of tidal flats in Chinese coast has been reclaimed to support agriculture and urban development because of rapid population and economic growth. Knowledge of soil development mechanisms is essential for efficient management of land resources in coastal zone. So far, most studies have focused on consequences of soil physico-chemical properties on soil quality evolution after tideland reclamation for cultivation; yet a large part of soil bioprocess drives many soil processes. The effect of organism composition on the performance of soil development remains unclear. The purpose of our work was to reveal the organism composition change and its influence on soil quality impotent. In this study, we choose seven reclamation districts along a chronosequence in eastern coast of China, which were respectively reclaimed in 1956, 1971, 1980, 1997, 2009, 2013 and unenclosed tidal flat. The latest districts reclaimed in 2013 were left to succession fallow which were covered with halophytic vegetation and the rest districts were agriculturally managed. Soil samples at 0-20 cm were collected in each district. Soil physical, chemical and biological properties and wheat yields were measured. The result showed after the transformation from tidal flat to cropland, longer tillage time (>5 year) lead to higher soil clay and silt, SOC contents and lower bulk density, while soil clay and C contents declined within the first 5 years after reclamation. Agricultural reclamation significantly improved SOC contents of 0-20 cm depth form 0.11±0.05% to 0.77±0.10%. It needs about 35 years to achieve stable yield level after reclamation. Meanwhile, the soil community composition changed strongly over time. More significant relationships were found among soil physicochemical properties and bacteria community. And the variation trend of soil community richness (chao1) is similar to soil C contents, dropped at first 5 years and then significantly increased. Our results indicate that the soil biodiversity growth promotes the soil quality recovery after crop cultivation. Both the soil physical environment and fertility were improved.

  10. A field experiment on Rn flux from reclaimed uranium mill tailings.

    PubMed

    Hinton, T G; Whicker, F W

    1985-04-01

    Design and construction techniques are described for a 1.6 ha experimental reclamation plot consisting of a 1-m-thick slab of uranium mill tailings covered with various depths of overburden. A passive, activated charcoal device was developed and used for measurements of Rn flux at the soil surface. Observations on Rn flux vs overburden depth indicated that tailings covered with 1.5 m of revegetated or 0.3 m of bare overburden had Rn exhalation rates comparable to background. Vegetated subplots exhibited a significantly higher (often an order of magnitude) flux than the bare subplots. A positive correlation was observed between precipitation quantities and Rn flux.

  11. Car wash wastewater treatment and water reuse - a case study.

    PubMed

    Zaneti, R N; Etchepare, R; Rubio, J

    2013-01-01

    Recent features of a car wash wastewater reclamation system and results from a full-scale car wash wastewater treatment and recycling process are reported. This upcoming technology comprises a new flocculation-column flotation process, sand filtration, and a final chlorination. A water usage and savings audit (22 weeks) showed that almost 70% reclamation was possible, and fewer than 40 L of fresh water per wash were needed. Wastewater and reclaimed water were characterized by monitoring chemical, physicochemical and biological parameters. Results were discussed in terms of aesthetic quality (water clarification and odour), health (pathological) and chemical (corrosion and scaling) risks. A microbiological risk model was applied and the Escherichia coli proposed criterion for car wash reclaimed water is 200 CFU 100 mL(-1). It is believed that the discussions on car wash wastewater reclamation criteria may assist institutions to create laws in Brazil and elsewhere.

  12. Translations on North Korea, No. 571

    DTIC Science & Technology

    1978-01-24

    of grain and the reclamation of 100,000 chongbo (1 chongbo is approximately 1 hectare) of tideland. Having received with deep emotion the New Year...developing in depth, we are faced with the task to raise labour productivity 1.7 times in industry and 1.6 times in construction, and guarantee more than...75 percent of the growth of the gross industrial output value by the growth of labour productivity. The new prospective plan envisaging vast goals

  13. 43 CFR 404.15 - How can I request assistance under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... feasibility study Submit a full proposal as described in § 404.20. 4. Request funding to conduct a feasibility study yourself or through a contractor Submit a full proposal as described in § 404.20. 5. Request Reclamation to review and approve an appraisal investigation or a feasibility study completed without...

  14. Polychlorinated biphenyls (PCBs) in sediments/soils of different wetlands along 100-year coastal reclamation chronosequence in the Pearl River Estuary, China.

    PubMed

    Zhao, Qingqing; Bai, Junhong; Lu, Qiongqiong; Gao, Zhaoqin; Jia, Jia; Cui, Baoshan; Liu, Xinhui

    2016-06-01

    PCBs (polychlorinated biphenyls) were determined in sediment/soil profiles to a depth of 30 cm from three different wetlands (i.e., ditch wetlands, riparian wetlands and reclaimed wetlands) of the Pearl River Estuary to elucidate their levels, distribution and toxic risks along a 100-year chronosequence of reclamation. All detected PCB congeners and the total 15 PCBs (∑15 PCBs) decreased with depth along sediment/soil profiles in these three wetlands. The ∑15 PCBs concentrations ranged from 17.68 to 169.26 ng/g in surface sediments/soils. Generally, old wetlands tended to have higher PCB concentrations than younger ones. The dominant PCB congeners at all sampling sites were light PCB homologues (i.e., tetra-CBs and tri-CBs). According to the sediment quality guideline, the average PCB concentrations exceeded the threshold effects level (TEL, 21.6 ng/g) at most of the sampling sites, exhibiting possible adverse biological effects, which were dominantly caused by light PCB congeners. The total toxic equivalent (TEQ) concentrations of 10 dioxin-like PCBs (DL-PCBs) detected at all sampling sites ranged from 0.04 to 852.7 (10(-3) ng/g), mainly affected by PCB126. Only DL-PCB concentrations in ditch and riparian wetland sediments with 40-year reclamation histories (i.e., D40 and Ri40) exhibited moderate adverse biological effects according to SQGQ values. Principal component analysis indicated that PCBs in three wetland sediments/soils mainly originated from Aroclor 1016, 1242, and 1248. Correlation analysis showed that sediment/soil organic carbon content had a significant correlation with the concentrations of several PCB congeners (P < 0.05), whereas no significant correlations were observed between any PCBs congeners and grain size or aggregate content (P > 0.05). Copyright © 2016 Elsevier Ltd. All rights reserved.

  15. 43 CFR 422.7 - Authorization to perform law enforcement duties.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reclamation official when the officer: (1) Terminates employment as a full-time police officer for any reason... can, upon showing just cause, revoke the authorization of an individual officer to perform law...

  16. Biosolids, crop, and groundwater data for a biosolids-application area near Deer Trail, Colorado, 2009 and 2010

    USGS Publications Warehouse

    Yager, Tracy J.B.; Smith, David B.; Crock, James G.

    2012-01-01

    During 2009 and 2010, the U.S. Geological Survey monitored the chemical composition of biosolids, crops, and groundwater related to biosolids applications near Deer Trail, Colorado, in cooperation with the Metro Wastewater Reclamation District. This monitoring effort was a continuation of the monitoring program begun in 1999 in cooperation with the Metro Wastewater Reclamation District and the North Kiowa Bijou Groundwater Management District. The monitoring program addressed concerns from the public about potential chemical effects from applications of biosolids to farmland in the area near Deer Trail, Colo. This report presents chemical data from 2009 and 2010 for biosolids, crops, and alluvial and bedrock groundwater. The chemical data include the constituents of highest concern to the public (arsenic, cadmium, copper, lead, mercury, molybdenum, nickel, selenium, zinc, and plutonium) in addition to many other constituents. The groundwater section also includes data for precipitation, air temperature, and depth to groundwater at various groundwater-monitoring sites.

  17. Hydrogeology of a Biosolids-Application Site Near Deer Trail, Colorado, 1993-99

    USGS Publications Warehouse

    Yager, Tracy J.B.; Arnold, L. Rick

    2003-01-01

    This report presents hydrogeology data and interpretations resulting from two studies related to biosolids applications at the Metro Wastewater Reclamation District property near Deer Trail, Colorado, done by the U.S. Geological Survey in cooperation with the Metro Wastewater Reclamation District: (1) a 1993-99 study of hydrology and water quality for the Metro Wastewater Reclamation District central property and (2) a 1999 study of regional bedrock-aquifer structure and local ground-water recharge. Biosolids were applied as a fertilizer during late 1993 through 1999. The 1993 Metro Wastewater Reclamation District property boundary constitutes the study area, but hydrogeologic structure maps for a much larger area are included in the report. The study area is located on the eastern margin of the Denver Basin, a bowl-shaped sequence of sedimentary rocks. The uppermost bedrock formations in the vicinity of the study area consist of the Pierre Shale, the Fox Hills Sandstone, and the Laramie Formation, parts of which comprise the Laramie-Fox Hills hydrostratigraphic unit and thus, where saturated, the Laramie-Fox Hills aquifer. In the vicinity of the study area, the Laramie-Fox Hills hydrostratigraphic unit dips gently to the northwest, crops out, and is partially eroded. The Laramie-Fox Hills aquifer is either absent or not fully saturated within the Metro Wastewater Reclamation District properties, although this aquifer is the principal aquifer used for domestic supply in the vicinity of the study area. Yield was small from two deep monitoring wells in the Laramie-Fox Hills aquifer within the study area. Depth to water in these wells was about 110 and 150 feet below land surface, and monthly water levels fluctuated 0.5 foot or less. Alluvial aquifers also are present in the unconsolidated sand and loess deposits in the valleys of the study area. Interactions of the deeper parts of the Laramie-Fox Hills aquifer with shallow ground water in the study area include a general close hydraulic connection between alluvial and bedrock aquifers, recharge of the Cottonwood Creek and much of the Muddy Creek alluvial aquifers by the bedrock aquifer, and possible recharge of the bedrock aquifer by a Rattlesnake Creek tributary. Some areas of shallow ground water were recharged by infiltration from rain or ponds, but other areas likely were recharged by other ground water. Data for shallow ground water indicate that ground-water recharge takes less than a day at some sites to about 40 years at another site. Depth to shallow ground water in the study area ranged from about 2 feet to about 37 feet below land surface. Shallow ground-water levels likely were affected by evapotranspiration. Ground water is present in shallow parts of the bedrock aquifer or in alluvial aquifers in four drainage basins: Badger Creek, Cottonwood Creek, Muddy Creek, and Rattlesnake Creek. These drainage basins generally contained only ephemeral streams, which flow only after intense rain.

  18. Monitoring and analysis of coastal reclamation from 1995-2015 in Tianjin Binhai New Area, China.

    PubMed

    Chen, Wengang; Wang, Dongchuan; Huang, Yong; Chen, Liding; Zhang, Lihui; Wei, Xiangwang; Sang, Mengqin; Wang, Feicui; Liu, Jinya; Hu, Bingxu

    2017-06-20

    Increasing coastal reclamation activities have been undertaken to solve the conflict between people and land resources, creating significant challenges for coordinating coastal reclamation, economic development and environmental protection. This paper analyzes the effects of coast reclamation on Gross Domestic Product growth and the quality of inshore seawater in the Tianjin Binhai New Area. Remote sensing and a Geographic Information System were used to extract the information of coastal reclamation. The correlation between the area of coastal reclamation, GDP growth and the quality of inshore seawater was analyzed and a decoupling elasticity model was used to explore trends in the relationship between economic development and coastal reclamation. Results showed that coastal reclamation activities played an important role in promoting economic development, but greatly damaged the ecological environment. Although the relationship between coastal reclamation and economic development has weakened during the last three periods, the influence on the environment will continue because of the cumulative effects of pollution. To maintain a balance between coastal reclamation, economic development and environmental protection, (1) coastal reclamation planning must address both economic and environmental outcomes; (2) environmental deficiencies from existing coastal reclamation projects must be rectified; and (3) the legal system regulating coastal reclamation needs to be refined and strengthened.

  19. New Technologies to Reclaim Arid Lands User's Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. K. Ostler

    2002-10-01

    Approximately 70 percent of all U.S. military training lands are located in arid and semi-arid areas. Training activities in such areas frequently adversely affect vegetation, damaging plants and reducing the resilience of vegetation to recover once disturbed. Fugitive dust resulting from a loss of vegetation creates additional problems for human health, increasing accidents due to decreased visibility, and increasing maintenance costs for roads, vehicles, and equipment. Under conventional technologies to mitigate these impacts, it is estimated that up to 35 percent of revegetation projects in arid areas will fail due to unpredictable natural environmental conditions, such as drought, and reclamationmore » techniques that were inadequate to restore vegetative cover in a timely and cost-effective manner. New reclamation and restoration techniques are needed in desert ranges to help mitigate the adverse effects of military training and other activities to arid-land environments. In 1999, a cooperative effort between the U.S. Department of Energy (DOE), the US. Department of Defense (DoD), and selected university scientists was undertaken to focus on mitigating military impacts in arid lands. As arid lands are impacted due to DoD and DOE activities, biological and soil resources are gradually lost and the habitat is altered. A conceptual model of that change in habitat quality is described for varying levels of disturbance in the Mojave Desert. As the habitat quality degrades and more biological and physical resources are lost from training areas, greater costs are required to return the land to sustainable levels. The purpose of this manual is to assist land managers in recognizing thresholds associated with habitat degradation and provide reclamation planning and techniques that can reduce the costs of mitigation for these impacted lands to ensure sustainable use of these lands. The importance of reclamation planning is described in this manual with suggestions about establishing project objectives, scheduling, budgeting, and selecting cost-effective techniques. Reclamation techniques include sections describing: (1) erosion control (physical, chemical, and biological), (2) site preparation, (3) soil amendments, (4) seeding, (5) planting, (6) grazing and weed control, (7) mulching, (8) irrigation, and (9) site protection. Each section states the objectives of the technique, the principles, an in-depth look at the techniques, and any special considerations as it relates to DoD or DOE lands. The need for monitoring and remediation is described to guide users in monitoring reclamation efforts to evaluate their cost-effectiveness. Costs are provided for the proposed techniques for the major deserts of the southwestern U.S. showing the average and range of costs. A set of decision tools are provided in the form of a flow diagram and table to guide users in selecting effective reclamation techniques to achieve mitigation objectives. Recommendations are provided to help summarize key reclamation principles and to assist users in developing a successful program that contributes to sustainable uses of DoD and DOE lands. The users manual is helpful to managers in communicating to installation management the needs and consequences of training decisions and the costs required to achieve successful levels of sustainable use. This users manual focuses on the development of new reclamation techniques that have been implemented at the National Training Center at Fort Irwin, California, and are applicable to most arid land reclamation efforts.« less

  20. 76 FR 12852 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are...

  1. 75 FR 60373 - Louisiana Regulatory Program/Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 918... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule... of Surface Mining Reclamation and Enforcement (OSM), are announcing receipt of a proposed amendment...

  2. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 780.27 Reclamation plan: Surface mining near underground mining. For surface... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Surface mining near... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  3. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  4. 76 FR 76104 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  5. 77 FR 55430 - Arkansas Regulatory Program and Abandoned Mine Land Reclamation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 904... Reclamation Plan AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and...

  6. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  7. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  8. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  9. 43 CFR 3601.40 - Mining and reclamation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Mining and reclamation plans. 3601.40... Materials Disposal; General Provisions Mining and Reclamation Plans § 3601.40 Mining and reclamation plans. BLM may require you to submit mining and reclamation plans before we begin any environmental review or...

  10. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program? This program addresses domestic, municipal, and industrial water...

  11. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  12. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  13. 30 CFR 914.25 - Approval of Indiana abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 26, 1994 Emergency response reclamation program. July 23, 1997 March 16, 1998 Indiana plan §§ 884.13... reclamation plan amendments. 914.25 Section 914.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE INDIANA § 914.25 Approval of Indiana abandoned mine land reclamation plan amendments. The...

  14. 43 CFR 418.13 - Maximum allowable limits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA... 308,319 acre-feet for the 1995 Example. The sample MAD corresponds to a system efficiency for full... Expected Project Distribution System Efficiency shows the target efficiencies which will be used over the...

  15. 43 CFR 418.13 - Maximum allowable limits.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA... 308,319 acre-feet for the 1995 Example. The sample MAD corresponds to a system efficiency for full... Expected Project Distribution System Efficiency shows the target efficiencies which will be used over the...

  16. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  17. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  18. Temporal-spatial variations and driving factors analysis of coastal reclamation in China

    NASA Astrophysics Data System (ADS)

    Meng, Weiqing; Hu, Beibei; He, Mengxuan; Liu, Baiqiao; Mo, Xunqiang; Li, Hongyuan; Wang, Zhongliang; Zhang, Yu

    2017-05-01

    Coastal reclamation is the gain of land from the sea or coastal wetlands for agricultural purposes, industrial use or port expansions. Large-scale coastal land reclamation can have adverse effects on the coastal environment, including loss of marine habitats and deterioration of coastal water quality. In recent decades, coastal land reclamation has occurred extensively to meet the increasing needs of rapid economic development and urbanization in China. The overall objective of this study is to understand the coastal reclamation status of China from 1979 to 2014 and analyzed its driving factors for mitigating negative ecological effects. The data of coastal reclamation were done with the ERDAS Imagine V9.2 platform and ArcGIS software based on remote images including Landsat, SPOT, ZY-2 and ZY-3. Potential driving factors for sea reclamation were selected based on statistics bulletins and the knowledge of experts in coastal management. In order to understand the relationships among possible impact factors and coastal reclamation, the Partial Least-Squares Regression models was constructed. The analysis results indicated that the total area of reclamation was 11162.89 km2 based on remote sensing images between 1979 and 2014. Shandong Province is the largest reclamation area, reaching 2736.54 km2, and the reclamation is mainly concentrated in Zhejiang, Jiangsu and Liaoning, where the reclamation areas were all more than 1000 km2. According to the remote sensing images, there are three coastal reclamation hotspot regions including Bohai bay (in which is located Liaoning, Tianjin and Hebei), Jiangsu province coastal area and Hangzhou bay (in Zhejiang province). A large scale land reclamation plan of more than 5880 km2 has been made by local government and 2469 km2 has approved by the State Council. From the analyzed results, there is a significant collinearity between these indicators, and no significant correlation between the area of reclamation and selected indicators. Economic development and employees in marine industries have weak positive correlation and correspondingly, the area of cultivated land (ACL) had a negative correlation. Because of the weak correlation, there is an assumption that economic development, outcome of coastal reclamation and population growth were not only was the direct driving factor, but also the outcome of coastal reclamation and population growth was not the direct driving indicator. Construction land quota and huge economic returns to local government may be the direct driving factors according to our field investigation. To resolve the contradiction between the need for land and coastal wetland conservation, it is recommended that China should establish a special management agency and coordination mechanisms, reconsidered the implementation of the reclamation plans and projects that have been approved, enhance law enforcement and increase penalties and strengthen public participation in reclamation management.

  19. 30 CFR 900.15 - Federal lands program cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 900.15 Section 900.15 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE INTRODUCTION § 900.15 Federal lands program cooperative agreements. The full text of any State and Federal...

  20. 30 CFR 900.12 - State regulatory programs.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....12 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE INTRODUCTION § 900.12 State... to be codified under the applicable part number assigned to the State. The full text will not appear...

  1. Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen

    This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less

  2. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33 How much Federal funding can Reclamation provide for the completion...

  3. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.30 How much Federal funding can Reclamation provide for the completion...

  4. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.32 Can Reclamation reduce the non-Federal cost-share required for an...

  5. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.43 What process will Reclamation follow to determine if an...

  6. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a...

  7. 30 CFR 745.11 - Application and agreement.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... approval under part 731 of this chapter, and has or may have within the State surface coal mining and... the full text of the terms of the proposed cooperative agreement as submitted or as subsequently...

  8. 30 CFR 732.11 - Review by the Director.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review by the Director. 732.11 Section 732.11 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR... full text of the program submission is available for review during regular business hours at the OSM...

  9. EFFECT OF RECYCLING THERMOPHILICALLY DIGESTED SLUDGE ON THE ACTIVATED SLUDGE PROCESS

    EPA Science Inventory

    A full-scale investigation was undertaken at Chicago's Hanover Park Water Reclamation Plant (WRP) to study whether the net sludge production from the WRP could be reduced by implementing a scheme developed by W. Torpey et al. (1984). n this process, sludge is withdrawn from a the...

  10. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.34 Can Reclamation reduce the amount of non-Federal cost-share required...

  11. A look at trees and reclamation in Georgia

    Treesearch

    Sanford P. Darby

    1980-01-01

    The author briefly reviews Georgia's land reclamation requirements when rehabilitating mined lands with trees as one's reclamation objective. Techniques used to establish two plantations are used to raise several important issues which, if resolved, can result in increased tree planting and lower land reclamation cost.

  12. 30 CFR 784.200 - Interpretive rules related to General Performance Standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION AND OPERATION PLAN § 784.200 Interpretive rules related to General Performance Standards. The... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL... Surface Mining Reclamation and Enforcement. (a) Interpretation of § 784.15: Reclamation plan: Postmining...

  13. 31 CFR 235.5 - Reclamation amounts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Reclamation amounts. 235.5 Section 235.5 Money and Finance: Treasury Regulations Relating to Money and Finance (Continued) FISCAL SERVICE... ON DESIGNATED DEPOSITARIES § 235.5 Reclamation amounts. Amounts received by way of reclamation on...

  14. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  15. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  16. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  17. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  18. 30 CFR 785.11 - Anthracite surface coal mining and reclamation operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Anthracite surface coal mining and reclamation..., DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... Anthracite surface coal mining and reclamation operations. (a) This section applies to any person who...

  19. 43 CFR 429.31 - What uses are prohibited on Reclamation land, facilities, and waterbodies?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... land, facilities, and waterbodies? 429.31 Section 429.31 Public Lands: Interior Regulations Relating to..., FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.31 What uses are prohibited on Reclamation land, facilities, and waterbodies? (a) Reclamation...

  20. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 784.15... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  1. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Land use information. 780.23... INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  2. 7 CFR 632.21 - Reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Reclamation plan. 632.21 Section 632.21 Agriculture... AGRICULTURE LONG TERM CONTRACTING RURAL ABANDONED MINE PROGRAM Participation § 632.21 Reclamation plan. (a) Responsibility. Land users are responsible for developing a reclamation plan that will serve as a basis for a...

  3. 43 CFR 422.9 - Reclamation law enforcement contracts and cooperative agreements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Reclamation law enforcement contracts and... PROJECTS Program Requirements § 422.9 Reclamation law enforcement contracts and cooperative agreements. (a... Federal laws. (b) Each contract and cooperative agreement authorizing the exercise of Reclamation law...

  4. 30 CFR 780.27 - Reclamation plan: Surface mining near underground mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Reclamation plan: Surface mining near underground mining. 780.27 Section 780.27 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL...

  5. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .../check_security_new.pdf. Institutions may contact the Fiscal Service Questioned Documents Branch at (202...) Reclamation debts are due to be paid upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest...

  6. Ecological bases of land reclamation in the mining regions of Ukraine

    NASA Astrophysics Data System (ADS)

    Kharytonov, Mykola; Gumentyk, Myhailo; Heilmeier, Hermann

    2016-04-01

    The mining production is situated in the several provinces of Ukraine. Specification of the problem coal and mixed sulfide mining activities in Ukraine have resulted in the generation of hundreds of millions of tons of hazardous wastes consisting of rest of manganese and iron oxides, traces of rare elements, sulphur bearing minerals, such as pyrite. These wastes have been / are still deposited, throughout the years, in huge stockpiles and dams. Land restoration in the mining region takes several forms. One of the ways is land reclamation. This way includes forest, recreation and agricultural reclamation. Land reclamation in industrial regions is conducted in one technological cycle with the process of ore mining. The soil mass is taken off, piled up and heaped onto the land after the rock has been replaced. The ecohydrogeological background of reclaimed lands forming and exploration was worked out. It foresee an environment restoration of disturbed lands to manage flow down, atmospheric precipitations taking aside, the process of the reclaimed profile biogenetic horizons formation and promotion with total depth 1.0-1.2 m and involvement of more suitable rocks and artificial drainage building. The effectiveness of different models of land reclamation and heavy metals migration through the rock-soil-plant system was investigated. Field experiments were carried out to study the adaptive potential of plants having different requirements for substrate fertility, with the main task to assess the prospects of land management for the rocks of the Nikopol manganese basin. The rocks exposed to the surface after manganese ore mining, first technical stage of landscape restoration, and plant melioration stages pass into other geochemical conditions and change their physical-chemical properties. During long-term melioration crops have dramatically improved some processes as following: bioweathering of rocks, phytomeliorated rocks fertility growth, etc. Meantime some rocks cannot be recommended for agricultural reclamation. Due to profile assessment the underlying layers of dark-gray shale still can be considered as object for heavy metals neutralization or phytoextraction. In Western Donbas the waste is stored in spoil dumps (19 million tons), and it is also used for the reclamation, for construction of the dams protecting the new bed of Samara river and artificial reservoirs. In a definite extent the ecological problems of Western Donbas are typical for the coal deposits, where the extraction is made by the closed way. The arrangement of used mine fields under the bottomland of Samara river leads to the earth surface subsidence. Due to chemical weathering from rocks (aqueous extract with pH<5) such macro components (nickel, copper, cobalt, chrome, nickel), but also micro impurity of rare metals (gallium, germanium, zirconium) come to environment. This environmental situation requires new technologies of phyto- and biomining. At this time seeds and rhizomes inoculation with arbuscular micorrhiza with some geochemical barriers (mechanical, sorption, oxidizing and rehabilitating) are subject for making decision. New ways are connected with agroforestry approaches development to grow energetic crops in the reclaimed minelands. Prospect results were obtained after first portion model field experiments with sorghum, miscanthus and swichgrass.

  7. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  8. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  9. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  10. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  11. 30 CFR 904.20 - Approval of Arkansas abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Arkansas abandoned mine land reclamation plan. 904.20 Section 904.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT.... Box 8913, Little Rock, AR 72219-8913. (b) Office of Surface Mining Reclamation and Enforcement, Tulsa...

  12. 30 CFR 947.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.784 Section 947.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  13. 30 CFR 922.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.784 Section 922.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  14. 30 CFR 905.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.780 Section 905.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  15. 30 CFR 933.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.784 Section 933.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  16. 30 CFR 939.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 939.784 Section 939.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  17. 30 CFR 910.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.780 Section 910.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  18. 30 CFR 941.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.784 Section 941.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  19. 30 CFR 947.780 - Surface mining permit application-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 947.780 Section 947.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Application—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  20. 30 CFR 937.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.780 Section 937.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirement for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  1. 30 CFR 912.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.784 Section 912.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  2. 30 CFR 903.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.780 Section 903.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application to conduct...

  3. 30 CFR 942.780 - Surface mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.780 Section 942.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  4. 30 CFR 942.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 942.784 Section 942.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  5. 30 CFR 921.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.784 Section 921.784 Mineral Resources OFFICE OF SURFACE... requirements for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  6. 30 CFR 905.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 905.784 Section 905.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  7. 30 CFR 937.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 937.784 Section 937.784 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  8. 30 CFR 910.784 - Underground mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 910.784 Section 910.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes...

  9. 30 CFR 941.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 941.780 Section 941.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  10. 30 CFR 912.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 912.780 Section 912.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  11. 30 CFR 933.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 933.780 Section 933.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  12. 30 CFR 939.780 - Surface mining permit applications-minimum requirements for reclamation and operations plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operations plan. 939.780 Section 939.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operations plan. (a) Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  13. 30 CFR 921.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 921.780 Section 921.780 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application...

  14. 30 CFR 903.784 - Underground mining permit applications-Minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 903.784 Section 903.784 Mineral Resources OFFICE OF SURFACE... for reclamation and operation plan. Part 784 of this chapter, Underground Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, applies to any person who submits an application...

  15. 30 CFR 922.780 - Surface mining permit applications-minimum requirements for reclamation and operation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements for reclamation and operation plan. 922.780 Section 922.780 Mineral Resources OFFICE OF SURFACE... reclamation and operation plan. Part 780 of this chapter, Surface Mining Permit Applications—Minimum Requirements for Reclamation and Operation Plan, shall apply to any person who makes application to conduct...

  16. 30 CFR 938.25 - Approval of Pennsylvania abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Pennsylvania abandoned mine land reclamation plan amendments. 938.25 Section 938.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE PENNSYLVANIA § 938.25 Approval of Pennsylvania abandoned mine land reclamation plan amendments...

  17. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  18. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... and identify opportunities to ensure safe and adequate rural water supplies for domestic, municipal... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What is the Reclamation Rural Water Supply... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the...

  19. 77 FR 11155 - Notice of Intent To Prepare an Environmental Impact Statement on the Pojoaque Basin Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Prepare an Environmental... Reclamation, Interior. ACTION: Notice of intent. SUMMARY: The Bureau of Reclamation (Reclamation) intends to... plan, design, and construct the Pojoaque Basin Regional Water System in accordance with the Settlement...

  20. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  1. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  2. 30 CFR 902.25 - Approval of Alaska abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation plan amendments. 902.25 Section 902.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE ALASKA § 902.25 Approval of Alaska abandoned mine land reclamation plan amendments. The following... approving all, or portions of these amendments, were published in the Federal Register and the State...

  3. 30 CFR 906.25 - Approval of Colorado abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan amendments. 906.25 Section 906.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE COLORADO § 906.25 Approval of Colorado abandoned mine land reclamation plan amendments. The...

  4. Succession of Bacterial Community Structure and Diversity in Soil along a Chronosequence of Reclamation and Re-Vegetation on Coal Mine Spoils in China

    PubMed Central

    Li, Yuanyuan; Wen, Hongyu; Chen, Longqian; Yin, Tingting

    2014-01-01

    The growing concern about the effectiveness of reclamation strategies has motivated the evaluation of soil properties following reclamation. Recovery of belowground microbial community is important for reclamation success, however, the response of soil bacterial communities to reclamation has not been well understood. In this study, PCR-based 454 pyrosequencing was applied to compare bacterial communities in undisturbed soils with those in reclaimed soils using chronosequences ranging in time following reclamation from 1 to 20 year. Bacteria from the Proteobacteria, Chloroflexi, Actinobacteria, Acidobacteria, Planctomycetes and Bacteroidetes were abundant in all soils, while the composition of predominant phyla differed greatly across all sites. Long-term reclamation strongly affected microbial community structure and diversity. Initial effects of reclamation resulted in significant declines in bacterial diversity indices in younger reclaimed sites (1, 8-year-old) compared to the undisturbed site. However, bacterial diversity indices tended to be higher in older reclaimed sites (15, 20-year-old) as recovery time increased, and were more similar to predisturbance levels nearly 20 years after reclamation. Bacterial communities are highly responsive to soil physicochemical properties (pH, soil organic matter, Total N and P), in terms of both their diversity and community composition. Our results suggest that the response of soil microorganisms to reclamation is likely governed by soil characteristics and, indirectly, by the effects of vegetation restoration. Mixture sowing of gramineae and leguminosae herbage largely promoted soil geochemical conditions and bacterial diversity that recovered to those of undisturbed soil, representing an adequate solution for soil remediation and sustainable utilization for agriculture. These results confirm the positive impacts of reclamation and vegetation restoration on soil microbial diversity and suggest that the most important phase of microbial community recovery occurs between 15 and 20 years after reclamation. PMID:25502754

  5. Addressing Open Water Data Challenges in the Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Danner, A.; Nagode, J.; Rocha, J.; Poulton, S.; Anderson, A.

    2017-12-01

    The Bureau of Reclamation is largest wholesaler of water in the United States. Located in the 17 western states, Reclamation serves water to 31 million people, provides irrigated water to 20 percent of Western farmers, and is the second largest producer of hydroelectric power in the United States. Through these activities, Reclamation generates large amounts of water and water-related data, describing reservoirs and river system conditions, hydropower, environmental compliance activities, infrastructure assets, and other aspects of Reclamation's mission activities. Reclamation aims to make water and water-related data sets more easily found, accessed, and used in decision-making activities in order to benefit the public, private sector, and research communities. Historically, there has not been an integrated, bureau-wide system to store data in machine-readable formats; nor a system to permit centralized browsing, open access, and web-services. Reclamation began addressing these limitations by developing the Reclamation Water Information System (RWIS), released in Spring 2017 (https://water.usbr.gov/). A bureau-wide team contributed to RWIS development, including water data stewards, database administrators, and information technology (IT) specialists. The first RWIS release publishes reservoir time series data from Reclamation's five regions and includes a map interface for sites identification, a query interface for data discovery and access, and web-services for automated retrieval. As RWIS enhancement continues, the development team is developing a companion system - the Reclamation Information Sharing Environment (RISE) - to provide access to the other data subjects and types (geospatial, documents). While RWIS and RISE are promising starts, Reclamation continues to face challenges in addressing open water data goals: making data consolidation and open publishing a value-added activity for programs that publish data locally, going beyond providing open access to also providing decision-support, and scaling up IT solutions for future success - where Reclamation programs increasingly elect to more and more data through RWIS/RISE, thereby creating a big data challenge. This presentation will highlight activities status, lessons learned, and future directions.

  6. 76 FR 39436 - Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and Notice of Scoping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San... livestock and/or municipal and industrial uses because of water supply shortages or when full contract... Contractors Water Authority's 25-Year Water Transfer Program 2014 to 2038, California AGENCY: Bureau of...

  7. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  8. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49... project be authorized for construction? In reviewing a feasibility study, Reclamation will assure that the... alternative is clearly supported by the feasibility study, based on application of the following factors...

  9. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  10. 43 CFR 404.26 - Must an appraisal investigation be completed before I can request Reclamation to review a...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... completed before I can request Reclamation to review a feasibility study that was not completed under this... appraisal investigation be completed before I can request Reclamation to review a feasibility study that was... prepare an appraisal report recommending that a feasibility study be conducted before Reclamation can...

  11. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49 What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply...

  12. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  13. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  14. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  15. Mine reclamation in Arkansas

    Treesearch

    Floyd Durham; James G. Barnum

    1980-01-01

    Open cut mine land reclamation laws have only been effective since 1971 in Arkansas. Since that time all land affected by mining had to be reclaimed. To guarantee reclamation, the first law required a $500 per acre surety bond be posted with the Arkansas Department of Pollution Control and Ecology. The Arkansas Open Cut Land Reclamation Act of 1977 changed the bonding...

  16. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  17. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  18. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  19. 30 CFR 931.25 - Approval of New Mexico abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of New Mexico abandoned mine land reclamation plan amendments. 931.25 Section 931.25 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND... STATE NEW MEXICO § 931.25 Approval of New Mexico abandoned mine land reclamation plan amendments. The...

  20. Hydrogeochemical analysis and evaluation of groundwater in the reclaimed small basin of Abu Mina, Egypt

    NASA Astrophysics Data System (ADS)

    Salem, Zenhom E.; Atwia, Mohamed G.; El-Horiny, Mohamed M.

    2015-12-01

    Agricultural reclamation activities during the last few decades in the Western Nile Delta have led to great changes in the groundwater levels and quality. In Egypt, changing the desert land into agricultural land has been done using transferred Nile water (through irrigation canal systems) or/and groundwater. This research investigates the hydrogeochemical changes accompanying the reclamation processes in the small basin of Abu Mina, which is part of the Western Nile Delta region. In summer 2008, 23 groundwater samples were collected and groundwater levels were measured in 40 observation wells. Comparing the groundwater data of the pre-reclamation (1974) and the post-reclamation (2008) periods, groundwater seems to have been subjected to many changes: rise in water level, modification of the flow system, improvement of water quality, and addition of new salts through dissolution processes. Generally, Abu Mina basin is subdivided into two areas, recharge and discharge. The dissolution and mixing were recognized in the recharge areas, while the groundwater of the discharge region carries the signature of the diluted pre-reclamation groundwater. The salts of soil and aquifer deposits play an important role in the salt content of the post and pre-reclamation groundwater. NaCl was the predominant water type in the pre-reclamation groundwater, while CaSO4, NaCl and MgSO4 are the common chemical facies in the post-reclamation groundwater. The post-reclamation groundwater mostly indicates mixing between the pre-reclamation groundwater and the infiltrated freshwater with addition of some ions due to interaction with soil and sediments.

  1. Prioritizing abandoned coal mine reclamation projects within the contiguous United States using geographic information system extrapolation.

    PubMed

    Gorokhovich, Yuri; Reid, Matthew; Mignone, Erica; Voros, Andrew

    2003-10-01

    Coal mine reclamation projects are very expensive and require coordination of local and federal agencies to identify resources for the most economic way of reclaiming mined land. Location of resources for mine reclamation is a spatial problem. This article presents a methodology that allows the combination of spatial data on resources for the coal mine reclamation and uses GIS analysis to develop a priority list of potential mine reclamation sites within contiguous United States using the method of extrapolation. The extrapolation method in this study was based on the Bark Camp reclamation project. The mine reclamation project at Bark Camp, Pennsylvania, USA, provided an example of the beneficial use of fly ash and dredged material to reclaim 402,600 sq mi of a mine abandoned in the 1980s. Railroads provided transportation of dredged material and fly ash to the site. Therefore, four spatial elements contributed to the reclamation project at Bark Camp: dredged material, abandoned mines, fly ash sources, and railroads. Using spatial distribution of these data in the contiguous United States, it was possible to utilize GIS analysis to prioritize areas where reclamation projects similar to Bark Camp are feasible. GIS analysis identified unique occurrences of all four spatial elements used in the Bark Camp case for each 1 km of the United States territory within 20, 40, 60, 80, and 100 km radii from abandoned mines. The results showed the number of abandoned mines for each state and identified their locations. The federal or state governments can use these results in mine reclamation planning.

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation,more » soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.« less

  3. Earthworm responses to different reclamation processes in post opencast mining lands during succession.

    PubMed

    Hlava, Jakub; Hlavová, Anna; Hakl, Josef; Fér, Miroslav

    2015-01-01

    This study provides earthworm population data obtained from localities with a substantial anthropogenic impact spoils. The spoil heaps were reclaimed at the end of an opencast brown coal mining period. We studied spoils reclaimed by the two most commonly used reclamation processes: forestry and agricultural. The results show the significance of the locality age and the utilized reclamation process and treatment and their effect on earthworm communities. Our data indicate that apart from soil physical and chemical properties, the reclamation process itself may also induce viability and distribution of earthworm communities. Under standardized soil properties, the changes in earthworm populations during the succession were larger within the agricultural reclamation process as opposed to the forestry reclamation process for earthworm ecological groups and individual species.

  4. Fifth symposium on surface mining and reclamation. NCA/BCR coal conference and Expo IV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1977-01-01

    The Fifth Symposium on Surface Mining and Reclamation, sponsored by the National Coal Association and Bituminous Coal Research, Inc., was held at the Kentucky Fair and Exposition Center, Louisville, Kentucky, October 18-20, 1977. Twenty-six papers from the proceedings have been entered individually into EDB and ERA. Topics covered include spoil bank revegetation, use of aerial photography, reclamation for row crop production, hydrology, computer programs related to this work, subirrigated alluvial valley floors, reclamation on steep slopes, mountain top removal, surface mine road design, successional processes involved in reclamation, land use planning, etc. (LTN)

  5. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? 404.49 Section 404.49 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  6. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  7. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  8. Drivers, trends, and potential impacts of long-term coastal reclamation in China from 1985 to 2010

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tian, Bo; Wu, Wenting; Yang, Zhaoqing

    Driven by rapid economic development, population growth, and urbanization, China has experienced severe coastal land reclamation over the last decades, which resulted in significant loss of coastal wetland and wildlife habitat, and degradation of marine ecosystems. This study used advanced remote-sensing techniques to analyze the spatial and temporal distributions of coastal reclamation in China and investigated the relationships between coastal land reclamation and coastal economy, population growth, and urbanization. Analysis of long-term Landsat images time series from 1985 to 2010 in 5-year intervals, in combination with remotely sensed image techniques, indicated a sharp increasing trend of land reclamation after 2005,more » which accounted for over 35% of China’s total reclamation during the 25-year period since 1985. High-intensity coastal reclamation in China was mainly driven by the booming economy associated with urbanization and industrial development in the coastal region. Analysis indicated that coastal land reclamation is closely correlated with the GDP per capita in China. Study results of Landsat images showed that 754,697 ha of coastal wetlands have been reclaimed across all coastal provinces and metropolises from 1985 to 2010, at an annual rate of 5.9%. Coastal areas within the three major economic zones (Bohai Bay, Yangtze River Delta, and Pearl River Delta) were found to generally have higher reclamation rates. For example, the built-up area in Shanghai, which is located in the Yangtze River Delta, increased more than five times from 1985 to 2010. Approximately 35% of the reclamation occurred in Bohai Bay, in which the CRI between 2005 and 2010 was three times higher than the average CRI over the 25-year period.« less

  9. Changes in Labile Organic Carbon Fractions and Soil Enzyme Activities after Marshland Reclamation and Restoration in the Sanjiang Plain in Northeast China

    NASA Astrophysics Data System (ADS)

    Song, Yanyu; Song, Changchun; Yang, Guisheng; Miao, Yuqing; Wang, Jiaoyue; Guo, Yuedong

    2012-09-01

    The extensive reclamation of marshland into cropland has tremendously impacted the ecological environment of the Sanjiang Plain in northeast China. To understand the impacts of marshland reclamation and restoration on soil properties, we investigated the labile organic carbon fractions and the soil enzyme activities in an undisturbed marshland, a cultivated marshland and three marshlands that had been restored for 3, 6 and 12 years. Soil samples collected from the different management systems at a depth of 0-20 cm in July 2009 were analyzed for soil organic carbon (SOC), dissolved organic carbon (DOC), microbial biomass carbon (MBC) and easily degradable organic carbon. In addition, the activities of the invertase, β-glucosidase, urease and acid phosphatase were determined. These enzymes are involved in C, N and P cycling, respectively. Long-term cultivation resulted in decreased SOC, DOC, MBC, microbial quotient and C (invertase, β-glucosidase) and N-transforming (urease) enzyme activities compared with undisturbed marshland. After marshland restoration, the MBC and DOC concentrations and the soil invertase, β-glucosidase and urease activities increased. Soil DOC and MBC concentrations are probably the main factors responsible for the different invertase, β-glucosidase and urease activities. In addition, marshland restoration caused a significant increase in the microbial quotient, which reflects enhanced efficiency of organic substrate use by microbial biomass. Our observations demonstrated that soil quality recovered following marshland restoration. DOC, MBC and invertase, β-glucosidase and urease activities were sensitive for discriminating soil ecosystems under the different types of land use. Thus, these parameters should be considered to be indicators for detecting changes in soil quality and environmental impacts in marshlands.

  10. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  11. 43 CFR 429.12 - Where do I file my application?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Reclamation office having jurisdiction over the land, facility, or waterbody associated with your request. Reclamation office locations may be found on http://www.usbr.gov, the official Reclamation Internet Web site. ...

  12. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  13. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  14. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... within the State which require reclamation, including— (1) A map showing the general location or known or...

  15. Mine Land Reclamation and Eco-Reconstruction in Shanxi Province I: Mine Land Reclamation Model

    PubMed Central

    Bing-yuan, Hao; Li-xun, Kang

    2014-01-01

    Coal resource is the main primary energy in our country, while Shanxi Province is the most important province in resource. Therefore Shanxi is an energy base for our country and has a great significance in energy strategy. However because of the heavy development of the coal resource, the ecological environment is worsening and the farmland is reducing continuously in Shanxi Province. How to resolve the contradiction between coal resource exploitation and environmental protection has become the imperative. Thus the concept of “green mining industry” is arousing more and more attention. In this assay, we will talk about the basic mode of land reclamation in mine area, the engineering study of mine land reclamation, the comprehensive model study of mine land reclamation, and the design and model of ecological agricultural reclamation in mining subsidence. PMID:25050398

  16. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  17. 43 CFR 404.25 - How can I request Reclamation to review an appraisal investigation or feasibility study that was...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.25 How can I request Reclamation to... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How can I request Reclamation to review an... prioritization criteria in § 404.13. (c) You may make your submittal at any time and are not required to submit a...

  18. Evaluation of the seasonal performance of a water reclamation pond-constructed wetland system for removing emerging contaminants.

    PubMed

    Matamoros, Víctor; Salvadó, Victòria

    2012-01-01

    The capacity of a full-scale reclamation pond-constructed wetland (CW) system to eliminate 27 emerging contaminants (i.e. pharmaceuticals, sunscreen compounds, fragrances, antiseptics, fire retardants, pesticides, and plasticizers) and the seasonal occurrence of these contaminants is studied. The compounds with the highest concentrations in the secondary effluent are diclofenac, caffeine, ketoprofen, and carbamazepine. The results show that the constructed wetland (61%) removes emerging contaminants significantly more efficiently than the pond (51%), presumably due to the presence of plants (Phragmites and Thypa) as well as the higher hydraulic residence time (HRT) in the CW. A greater seasonal trend to the efficient removal of these compounds is observed in the pond than in the CW. The overall mass removal efficiency of each individual compound ranged from 27% to 93% (71% on average), which is comparable to reported data in advanced treatments (photo-fenton and membrane filtration). The seasonal average content of emerging contaminants in the river water (2488 ng L(-1)) next to the water reclamation plant is found to be higher than the content in the final reclaimed water (1490 ng L(-1)), suggesting that the chemical quality of the reclaimed water is better than available surface waters. Copyright © 2011 Elsevier Ltd. All rights reserved.

  19. Landscape ecological security response to land use change in the tidal flat reclamation zone, China.

    PubMed

    Zhang, Runsen; Pu, Lijie; Li, Jianguo; Zhang, Jing; Xu, Yan

    2016-01-01

    As coastal development becomes a national strategy in Eastern China, land use and landscape patterns have been affected by reclamation projects. In this study, taking Rudong County, China as a typical area, we analyzed land use change and its landscape ecological security responses in the tidal flat reclamation zone. The results show that land use change in the tidal flat reclamation zone is characterized by the replacement of natural tidal flat with agricultural and construction land, which has also led to a big change in landscape patterns. We built a landscape ecological security evaluation system, which consists of landscape interference degree and landscape fragile degree, and then calculated the landscape ecological security change in the tidal flat reclamation zone from 1990 to 2008 to depict the life cycle in tidal flat reclamation. Landscape ecological security exhibited a W-shaped periodicity, including the juvenile stage, growth stage, and maturation stage. Life-cycle analysis demonstrates that 37 years is required for the land use system to transform from a natural ecosystem to an artificial ecosystem in the tidal flat reclamation zone.

  20. 30 CFR 784.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.1 Scope. This part... mining operations and reclamation plans portions of applications for permits for underground mining...

  1. 30 CFR 701.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... program implementation; (2) Subchapter D on surface coal mining and reclamation operations on Federal lands; (3) Subchapter E on surface coal mining and reclamation operations on Indian lands. (4...

  2. 30 CFR 780.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.10... activities, including a requirement that the application include an operation and reclamation plan. The...

  3. 30 CFR 701.4 - Responsibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL PERMANENT... responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the... mining and reclamation operations, approval of coal exploration which substantially disturbs the natural...

  4. Chemical mass transport between fluid fine tailings and the overlying water cover of an oil sands end pit lake

    NASA Astrophysics Data System (ADS)

    Dompierre, Kathryn A.; Barbour, S. Lee; North, Rebecca L.; Carey, Sean K.; Lindsay, Matthew B. J.

    2017-06-01

    Fluid fine tailings (FFT) are a principal by-product of the bitumen extraction process at oil sands mines. Base Mine Lake (BML)—the first full-scale demonstration oil sands end pit lake (EPL)—contains approximately 1.9 × 108 m3 of FFT stored under a water cover within a decommissioned mine pit. Chemical mass transfer from the FFT to the water cover can occur via two key processes: (1) advection-dispersion driven by tailings settlement; and (2) FFT disturbance due to fluid movement in the water cover. Dissolved chloride (Cl) was used to evaluate the water cover mass balance and to track mass transport within the underlying FFT based on field sampling and numerical modeling. Results indicated that FFT was the dominant Cl source to the water cover and that the FFT is exhibiting a transient advection-dispersion mass transport regime with intermittent disturbance near the FFT-water interface. The advective pore water flux was estimated by the mass balance to be 0.002 m3 m-2 d-1, which represents 0.73 m of FFT settlement per year. However, the FFT pore water Cl concentrations and corresponding mass transport simulations indicated that advection rates and disturbance depths vary between sample locations. The disturbance depth was estimated to vary with location between 0.75 and 0.95 m. This investigation provides valuable insight for assessing the geochemical evolution of the water cover and performance of EPLs as an oil sands reclamation strategy.

  5. Recent developments in the reclamation of surface mined lands

    USGS Publications Warehouse

    Sharma, K.D.; Gough, L.P.; Kumar, S.; Sharma, B.K.; Saxena, S.K.

    1997-01-01

    A broad review of mine land reclamation problems and challenges in arid lands is presented with special emphasis on work recently completed in India. The economics of mining in the Indian Desert is second only to agriculture in importance. Lands disturbed by mining, however, have only recently been the focus of reclamation attempts. Studies were made and results compiled of problems associated with germplasm selection, soil, plant and overburden characterization and manipulation, plant establishment methods utilized, soil amendment needs, use and conservation of available water and the evaluation of ecosystem sustainability. Emphasis is made of the need for multi-disciplinary approaches to mine land reclamation research and for the long-term monitoring of reclamation success.

  6. Use of morphometric soil aggregates parameters to evaluate the reclamation process in mined areas located at amazon forest - Brazil

    NASA Astrophysics Data System (ADS)

    Ribeiro, A. I.; Fengler, F. H.; Longo, R. M.; Mello, G. F.; Damame, D. B.; Crowley, D. E.

    2015-12-01

    Brazil has a high mineral potential that have been explored over the years. A large fraction of these mineral resources are located in Amazon region, which is known for its large biodiversity and world climate importance. As the policies that control the Amazon preservation are relatively new, several mining activities have been exploring the Amazon territory, promoting a large process of degradation. Once the mining activities have a high potential of environmental changes the government created polices to restrain the mining in Amazon forests and obligate mining companies to reclaim theirs minded areas. However, the measurement of reclamation development still is a challenging task for the Professionals involved. The volume and complexity of the variables, allied to the difficulty in identifying the reclamation of ecosystem functionalities are still lack to ensure the reclamation success. In this sense this work aims to investigate the representativeness of morphometric soil aggregates parameters in the understanding of reclamation development. The study area is located in the National Forest of Jamari, State of Rondônia. In the past mining companies explored the region producing eight closed mines that are now in reclamation process. The soil aggregates morphometric measurements: geometric mean diameter (GMD), aggregate circularity index, and aggregate roundness, were choose based in its obtaining facility, and their association to biological activity. To achieve the proposed objective the aggregates of eight sites in reclamation, from different closed mines, where chosen and compared to Amazon forest and open mine soil aggregates. The results were analyzed to one way ANOVA to identifying differences between areas in reclamation, natural ecosystem, and open mine. It was obtained differences for GMD and circularity index. However, only the circularity index allowed to identifying differences between the reclamation sites. The results allowed concluding: (1) Morphometric aggregates measurements can represent the reclamation process in Amazon territory; (2) To validate the results more areas in reclamation process in different ecosystems must be investigated; (3) Roundness didn't represented any differences.Key words: circularity index, ecosystem, geometric mean diameter.

  7. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT REGULATORY... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation...

  8. 30 CFR 780.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.1 Scope. This part provides the... operations and reclamation plan portions of applications for permits for surface mining activities, except to...

  9. 77 FR 67024 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... procedures and requirements for terminating jurisdiction of surface coal mining and reclamation operations... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice...

  10. 77 FR 58056 - Mississippi Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 924... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  11. 76 FR 36039 - Colorado Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 906... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Colorado proposes both additions...

  12. 77 FR 34890 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  13. 76 FR 50708 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation...

  14. 75 FR 60371 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  15. 77 FR 41680 - Indiana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 914... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving amendments to the Indiana...

  16. 77 FR 25949 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  17. 76 FR 76109 - Colorado Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 906... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public...'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Colorado...

  18. 77 FR 66574 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  19. 77 FR 18149 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public... receipt of Montana's response to the Office of Surface Mining Reclamation and Enforcement's (OSM) November...

  20. 77 FR 24661 - North Dakota Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 934... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). North Dakota proposes...

  1. 76 FR 23522 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  2. 75 FR 21534 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  3. 77 FR 34892 - Utah Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  4. 77 FR 18738 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-28

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  5. 76 FR 9700 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation...

  6. 43 CFR 404.23 - How will Reclamation determine whether you or your contractor is qualified to conduct an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.23 How will Reclamation... expertise needed may include, but are not limited to, water management planning, engineering, hydrology...

  7. 77 FR 31038 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-24

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION: Notice and... Surface Mining Reclamation and Enforcement (OSM) is announcing that the information collection request for...

  8. 77 FR 21807 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice... of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request approval...

  9. 77 FR 40796 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Final rule. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are removing a disapproval codified in OSM regulations...

  10. 77 FR 34894 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; withdrawal. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing the withdrawal of a proposed rule...

  11. 76 FR 12857 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment... the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Montana proposed...

  12. 77 FR 6141 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION: Notice and... Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request approval to...

  13. 78 FR 11617 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Surface Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; reopening of comment... regulatory program (the ``Pennsylvania program'') under the Surface Mining Control and Reclamation Act of...

  14. Sustainability of Metal Structures via Spray-Clad Remanufacturing

    NASA Astrophysics Data System (ADS)

    Smith, Gregory M.; Sampath, Sanjay

    2018-04-01

    Structural reclamation and remanufacturing is an important future design consideration to allow sustainable recovery of degraded structural metals. Heavy machinery and infrastructure components subjected to extended use and/or environment induced degradation require costly and time-consuming replacement. If these parts can be remanufactured to original tolerances, and returned to service with "as good or better" performance, significant reductions in materials, cost, and environmental impact can be achieved. Localized additive restoration via thermal or cold spray methods is a promising approach in recovering and restoring original design strength of degraded metals. The advent of high velocity spray deposition technologies has allowed deposition of near full density materials. In this review, the fundamental scientific and technological elements of such local additive restoration is contemplated including materials, processes, and methodologies to assess the capabilities of such remanufactured systems. This points to sustainable material reclamation, as well as a route toward resource and process sustainability.

  15. Modeling the temporal dynamics of intertidal benthic infauna biomass with environmental factors: Impact assessment of land reclamation.

    PubMed

    Yang, Ye; Chui, Ting Fong May; Shen, Ping Ping; Yang, Yang; Gu, Ji Dong

    2018-03-15

    Anthropogenic activities such as land reclamation are threatening tidal marshes worldwide. This study's hypothesis is that land reclamation in a semi-enclosed bay alters the seasonal dynamics of intertidal benthic infauna, which is a key component in the tidal marsh ecosystem. Mai Po Tidal Marsh, Deep Bay, Pearl River Estuary, China was used as a case study to evaluate the hypothesis. Ecological models that simulate benthic biomass dynamics with governing environmental factors were developed, and various scenario experiments were conducted to evaluate the impact of reclamations. Environmental variables, selected from the areas of hydrodynamics, meteorology, and water quality based on correlation analysis, were used to generate Bayesian regression models for biomass prediction. The best-performing model, which considered average water age (i.e., a hydrodynamic indicator of estuarine circulation) in the previous month, salinity variation (i.e., standard deviation of salinity), and the total sunny period in the current month, captured well both seasonal and yearly trends in the benthic infauna observations from 2002 to 2008. This model was then used to simulate biomass dynamics with varying inputs of water age and salinity variation from coastal numerical models of different reclamation scenarios. The simulation results suggest that the reclamation in 2007 decreased the spatial and annual average benthic infauna biomass in the tidal marsh by 20%, which agreed with the 28% biomass decrease recorded by field survey. The range of biomass seasonal variation also decreased significantly from 2.1 to 230.5g/m 2 (without any reclamation) to 1.2 to 131.1g/m 2 (after the 2007 reclamation), which further demonstrates the substantial ecological impact of reclamation. The ecological model developed in this study could simulate seasonal biomass dynamics and evaluate the ecological impact of reclamation projects. It can therefore be applied to evaluate the ecological impact of coastal engineering projects for tidal marsh management, conservation, and restoration. Copyright © 2017 Elsevier B.V. All rights reserved.

  16. Large-scale scour of the sea floor and the effect of natural armouring processes, land reclamation Maasvlakte 2, port of Rotterdam

    USGS Publications Warehouse

    Boer, S.; Elias, E.; Aarninkhof, S.; Roelvink, D.; Vellinga, T.

    2007-01-01

    Morphological model computations based on uniform (non-graded) sediment revealed an unrealistically strong scour of the sea floor in the immediate vicinity to the west of Maasvlakte 2. By means of a state-of-the-art graded sediment transport model the effect of natural armouring and sorting of bed material on the scour process has been examined. Sensitivity computations confirm that the development of the scour hole is strongly reduced due to the incorporation of armouring processes, suggesting an approximately 30% decrease in terms of erosion area below the -20m depth contour. ?? 2007 ASCE.

  17. 30 CFR 740.11 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... jurisdiction. (e) This subchapter shall not apply to surface coal mining and reclamation operations within a... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.11...

  18. 78 FR 6062 - North Dakota Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 934... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). North Dakota intends to...

  19. 77 FR 34888 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917 [KY-255-FOR; OSM-2012-0004] Kentucky Regulatory Program AGENCY: Office of Surface Mining Reclamation... Program (hereinafter, the ``Kentucky program'') under the Surface Mining Control and Reclamation Act of...

  20. 77 FR 31486 - Virginia Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 946 [VA-126-FOR; OSM-2008-0012] Virginia Regulatory Program AGENCY: Office of Surface Mining Reclamation... an amendment to the Virginia regulatory program under the Surface Mining Control and Reclamation Act...

  1. 76 FR 4266 - New Mexico Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 931... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). New Mexico proposes revisions to...

  2. 76 FR 9642 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...

  3. 78 FR 13002 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Mining Reclamation and Enforcement (``OSM''), Interior. ACTION: Proposed rule; public comment period and... regulatory program under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or the ``Act...

  4. 78 FR 11579 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  5. 78 FR 10512 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment with certain... ``Wyoming program'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act...

  6. 76 FR 50436 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917 [KY-254-FOR; OSM-2011-0005] Kentucky Regulatory Program AGENCY: Office of Surface Mining Reclamation... Program (hereinafter, the ``Kentucky program'') under the Surface Mining Control and Reclamation Act of...

  7. 77 FR 8144 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving three...

  8. 76 FR 30008 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 901... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Alabama...

  9. 75 FR 43476 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; reopening and extension of public...'') under the Surface Mining Control and Reclamation Act of 1977 (``SMCRA'' or ``the Act''). Montana revised...

  10. 30 CFR 800.14 - Determination of bond amount.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 800.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR BONDING AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.14...

  11. 75 FR 81122 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  12. 77 FR 58025 - Texas Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 943... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are approving an amendment to the Texas...

  13. 76 FR 44357 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior Department... Reduction Act of 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its...

  14. 76 FR 79213 - Notice of Proposed Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice... 1995, the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  15. 30 CFR 874.16 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 874.16 Section 874.16 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.16 Contractor eligibility. To receive...

  16. 30 CFR 875.20 - Contractor eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Contractor eligibility. 875.20 Section 875.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION CERTIFICATION AND NONCOAL RECLAMATION § 875.20 Contractor eligibility. Every...

  17. 77 FR 58147 - Action Subject to Intergovernmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Action Subject to Intergovernmental Review AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement, are notifying the public that we...

  18. 76 FR 78312 - Action Subject to Intergovernmental Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-16

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Action Subject to Intergovernmental Review AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Notice. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement, are notifying the public that we...

  19. Reclamation after oil and gas development does not speed up succession or plant community recovery in big sagebrush ecosystems in Wyoming

    USGS Publications Warehouse

    Rottler, Caitlin M.; Burke, Ingrid C.; Palmquist, Kyle A.; Bradford, John B.; Lauenroth, William K.

    2018-01-01

    Article for intended outlet: Restoration Ecology. Abstract: Reclamation is an application of treatment(s) following a disturbance to promote succession and accelerate the return of target conditions. Previous studies have framed reclamation in the context of succession by studying its effectiveness in re-establishing late-successional plant communities. Re-establishment of these plant communities is especially important and potentially challenging in regions such as drylands and shrub steppe ecosystems where succession proceeds slowly. Dryland shrub steppe ecosystems are frequently associated with areas rich in fossil-fuel energy sources, and as such the need for effective reclamation after disturbance from fossil-fuel-related energy development is great. Past research in this field has focused primarily on coal mines; few researchers have studied reclamation after oil and gas development. To address this research gap and to better understand the effect of reclamation on rates of succession in dryland shrub steppe ecosystems, we sampled oil and gas wellpads and adjacent undisturbed big sagebrush plant communities in Wyoming, USA and quantified the extent of recovery for major functional groups on reclaimed and unreclaimed (recovered via natural succession) wellpads relative to the undisturbed plant community. Reclamation increased the rate of recovery for all forb and grass species as a group and for perennial grasses, but did not affect other functional groups. Rather, analyses comparing recovery to environmental variables and time since wellpad abandonment showed that recovery of other groups were affected primarily by soil texture and time since wellpad abandonment. This is consistent with studies in other ecosystems where reclamation has been implemented, suggesting that reclamation may not help re-establish late-successional plant communities more quickly than they would re-establish naturally.

  20. 76 FR 64048 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Surface Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; reopening and extension... Mining Control and Reclamation Act of 1977 (SMCRA or the Act) published on February 7, 2011. In response...

  1. 75 FR 60271 - Technical Amendments 2010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... Part VI Department of the Interior Office of Surface Mining Reclamation and Enforcement 30 CFR... INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 740, 761, 773, 795, 816, 817...: Office of Surface Mining Reclamation and Enforcement, Interior. ACTION: Final rule. SUMMARY: We, the...

  2. 77 FR 5740 - Tennessee Abandoned Mine Land Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 942... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; public comment period and... amendment to the Tennessee Abandoned Mine Land (AML) Reclamation Plan under the Surface Mining Control and...

  3. 77 FR 58053 - Kentucky Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 917... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; Removal of Required Amendments... program'') under the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act). As a result of...

  4. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  5. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  6. Oilfield reclamation in mixed grass prairie restores nematode but not plant communities

    USDA-ARS?s Scientific Manuscript database

    Background/Questions/Methods: Energy development in North American grasslands involves developing oil well pads and access roads. Reclamation/revegetation is constant: interim reclaims are conducted when drilling is complete and pumping commences, and final reclamation occurs upon cessation of well ...

  7. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  8. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  9. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  10. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  11. 30 CFR 740.1 - Scope and purpose.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.1 Scope and purpose. This part provides for the regulation of surface coal mining and reclamation...

  12. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  13. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  14. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  15. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  16. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  17. 77 FR 16260 - Notice of Proposed Information Collection for 1029-0035

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0035 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  18. 75 FR 22723 - Stream Protection Rule; Environmental Impact Statement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Parts 780... of Surface Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; notice of intent to prepare an environmental impact statement. SUMMARY: We, the Office of Surface Mining Reclamation and...

  19. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  20. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  1. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  2. 31 CFR 240.8 - Reclamation of amounts of paid checks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....pdf. Institutions may contact the FMS Questioned Documents Branch at (202) 874-7640 for additional... upon receipt of the reclamation by the reclamation debtor. Interest, penalties, and administrative costs associated with unpaid balances will accrue as follows: (1) Interest. Treasury will assess...

  3. 77 FR 26040 - Notice of Proposed Information Collection for 1029-0061

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0061 AGENCY: Office of Surface Mining Reclamation and Enforcement. ACTION... Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request renewed...

  4. 76 FR 46841 - Notice of Proposed Information Collection for 1029-0039

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Requirements for Reclamation and Operation Plans. DATES: Comments on the proposed information collection must... Requirements for Reclamation and Operation Plans. OMB Control Number: 1029-0039. Summary: Sections 507(b), 508... operations and reclamation plan and establish performance standards for the mining operation. Information...

  5. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  6. 30 CFR 773.14 - Eligibility for provisionally issued permits.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... 773.14 Section 773.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION... surface coal mining and reclamation operation with— (1) A notice of violation issued under § 843.12 of...

  7. 78 FR 63909 - Missouri Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 925... 08011000 SX066A00033 F13XS501520] Missouri Regulatory Program AGENCY: Office of Surface Mining Reclamation... hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM...

  8. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  9. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  10. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  11. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Reclamation requirements. 9.11 Section 9.11 Parks, Forests, and Public Property NATIONAL PARK SERVICE, DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as...

  12. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  13. 77 FR 16259 - Notice of Proposed Information Collection for 1029-0059

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement Notice of Proposed Information Collection for 1029-0059 AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request...

  14. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  15. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  16. 30 CFR 785.12 - Special bituminous surface coal mining and reclamation operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Special bituminous surface coal mining and... ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL....12 Special bituminous surface coal mining and reclamation operations. (a) This section applies to any...

  17. 77 FR 8896 - Notice of Proposed Information Collection for 1029-0036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-15

    ... request for Surface Mining Permit Applications--Minimum Requirements for Reclamation and Operation Plan... Permit Applications-- Minimum Requirements for Reclamation and Operation Plan. OSM is requesting a 3-year... Requirements for Reclamation and Operation Plan. OMB Control Number: 1029-0036. SUMMARY: Sections 507(b), 508(a...

  18. 76 FR 73674 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... INFORMATION CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O...

  19. 76 FR 60527 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007...

  20. 75 FR 82066 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Services Division, Bureau of Reclamation, P.O. Box 25007...

  1. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to review an appraisal investigation or feasibility study completed without the support of... Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without... appraisal investigation or feasibility study is eligible to be reviewed under the program. Reclamation will...

  2. 43 CFR 404.27 - How will Reclamation evaluate my request to review an appraisal investigation or feasibility...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... to review an appraisal investigation or feasibility study completed without the support of... Reclamation evaluate my request to review an appraisal investigation or feasibility study completed without... appraisal investigation or feasibility study is eligible to be reviewed under the program. Reclamation will...

  3. Trees for reclamation in the Eastern United States: a West Virginia perspective

    Treesearch

    James E. Pitsenbarger

    1980-01-01

    Traditionally, in West Virginia, trees have been an integral and important part of the reclamation program. Moreover with the advent of Public Law 95-87, it certainly would appear that trees are destined to play increasingly diverse and important roles in the field of reclamation.

  4. 78 FR 63911 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926...; S2D2SSS08011000 SX066A00033 F13XS501520] Montana Regulatory Program AGENCY: Office of Surface Mining Reclamation... regulatory program (hereinafter, the ``Montana program'') under the Surface Mining Control and Reclamation...

  5. 52. Photographic copy of construction drawing, U.S. Reclamation Service, December ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photographic copy of construction drawing, U.S. Reclamation Service, December 1911 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Keechelus Dam - general plan of dam site." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  6. 43 CFR 404.11 - What type of assistance is available under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.11 What type of assistance is available under the program? Under the Reclamation Rural Water Supply... rural water supply project for you, with your cooperation; (b) Request funding through a grant or...

  7. 77 FR 33766 - Agency Information Collection Activities; Renewal of a Currently Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection Activities; Renewal... Reclamation, Interior. ACTION: Notice of renewal and request for comments. SUMMARY: The Bureau of Reclamation... tribal organizations, to plan the design and construction of projects to serve rural areas with...

  8. 51. Photographic copy of construction drawing, U.S. Reclamation Service, August ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of construction drawing, U.S. Reclamation Service, August 1906 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Crib dam at Lake Keechelus." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  9. 77 FR 5049 - Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement; Notice of Proposed Information Collection for 1029-0103 AGENCY: Office of Surface Mining Reclamation and Enforcement... of 1995, the Office of Surface Mining (OSM) is announcing its intention to renew its authority for...

  10. 78 FR 41421 - Notice of Proposed Information Collection; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement [S1D1S SS08011000... Collection; Request for Comments AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing its intention to request...

  11. 78 FR 66381 - Notice of Proposed Information Collection; Request for Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement [S1D1S SS08011000... Collection; Request for Comments AGENCY: Office of Surface Mining Reclamation and Enforcement, Interior..., the Office of Surface Mining Reclamation and Enforcement (OSM) is announcing that the information...

  12. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  13. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  14. Trees for reclamation in the Eastern United States

    Treesearch

    C. W. Moody; Daniel T. Kimbrell

    1980-01-01

    The Alabama Forestry Commission promotes reclamation through forest resource education providing seedlings for reclamation and assistance to industry and landowners. Approximately 85% of the lands mined in 1979 will go into forest production. Good forest management on reclaimed lands will enable Alabama to meet its future demands for forest products.

  15. 30 CFR 886.21 - What must I report?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false What must I report? 886.21 Section 886.21 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.21 What...

  16. Approaches to Post-Mining Land Reclamation in Polish Open-Cast Lignite Mining

    NASA Astrophysics Data System (ADS)

    Kasztelewicz, Zbigniew

    2014-06-01

    The paper presents the situation regarding the reclamation of post-mining land in the case of particular lignite mines in Poland until 2012 against the background of the whole opencast mining. It discusses the process of land purchase for mining operations and its sales after reclamation. It presents the achievements of mines in the reclamation and regeneration of post-mining land as a result of which-after development processes carried out according to European standards-it now serves the inhabitants as a recreational area that increases the attractiveness of the regions.

  17. An exploration of Bureau of Reclamation approaches for managing conflict over diverging science

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily; Clark, Douglas

    2008-01-01

    As a major institutional agent supplying Western water resources, the Bureau of Reclamation (Reclamation) provides important leadership, technical, and financial resources in water management, serving as the West's "water broker" (Bowersox 2000; Pisani 2003). In recent years, growing numbers of constituencies using water and the over-allocation of water resources have contributed to conflict over the resource in the American West (National Research Council 2004). Although the conflicts arise from many sources, one common theme is that Reclamation managers often must make decisions about water use and allocation when scientific studies provide uncertain or competing recommendations. We conducted a preliminary study of Reclamation water managers and water scientists to try to understand the approaches or techniques they use or consider useful for dealing with scientific conflicts over water allocation and how these compare to techniques found in the relevant literature. We report the results of (1) an electronic survey of Reclamation senior managers and (2) a panel discussion amongst Reclamation senior managers as to the current institutional capabilities for managing diverging scientific findings in water dispute resolution processes. We conclude with a discussion of the strengths and weaknesses of the different tools and techniques managers reported in the survey and in the panel discussion.

  18. Reclamation of mined lands in the western coal region

    USGS Publications Warehouse

    Narten, Perry F.; Litner, S.F.; Allingham, J.W.; Foster, Lee; Larsen, D.M.; McWreath, H.C.

    1983-01-01

    In 1978, a group of scientists from several Federal agencies examined reclamation work at 22 coal mines in seven western States. The results of these examinations were not used to derive quantitative predictions of the outcome of reclamation work but rather to determine the general requirements for revegetation success. Locally, reclamation efforts are affected by climate, especially precipitation; the landform of the restored surface; the nature of the overburden material; the nature of the surface soil; and the natural ecological system. The goals of reclamation efforts are now broader than ever. Regulations call not only for reducing the steepness of the final surface and establishing a cover of mostly perennial native vegetation, but for restoring the land for specific land uses, achieving diversity both in types of plants and in number of species, and reintroduction of biological and ecological processes. If specific sites are monitored over a long enough period of time, quantitative predictions of success for individual mines may be possible, and such predictions can be included in environmental impact statements to help in the decision-making process. The results of this study indicate that current reclamation objectives can be met when the reclamation effort is designed on the basis of site-specific needs and when existing technology is used.

  19. Establishment of warm-season native grasses and forbs on drastically disturbed lands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miller, S.

    Establishment of warm-season native grasses and forbs (WSNGs) has been viewed by landowners, agronomists, natural resource managers and reclamation specialists as being too expensive and difficult, especially for reclamation, which requires early stand closure and erosion control. Natural resource managers have learned a great deal about establishing WSNGs since the implementation of the 1985 Farm Bill`s Conservation Reserve Program (CRP). Reclamation specialists must begin to use this information to improve reclamation success. Quality control of seed equipment and planting methods has been proven to be the crucial first step in successful establishment. Seedling germination, growth and development of WSNGs aremore » different from that of introduced cool-season grasses and legumes. Specialized seed drills and spring planting periods are essential. Because shoot growth lags far behind root growth the first two seasons, WSNGs often are rejected for reclamation use. Usually, the rejection is based on preconceived notions that bare ground will erode and on reclamation specialists` desire for a closed, uniform, grassy lawn. WSNG`s extensive root systems inhibit rill and gully erosion by the fall of the first season. Planting a weakly competitive, short-lived nurse crop such as perennial ryegrass (Lolium perenne) at low rates with the WSNG mixture can reduce first-season sheet and rill erosion problems and give an appearance of a closed stand. Benefits of WSNGs in soil building and their acid-tolerance make them ideal species for reclamation of drastically disturbed lands. WSNGs and forbs enhance wildlife habitat and promote natural succession and the invasion of the reclamation site by other native species, particularly hardwood trees, increasing diversity and integrating the site into the local ecosystem. This is perhaps their most important attribute. Most alien grasses and legumes inhibit natural succession, slowing the development of a stable mine soil ecosystem. This paper outlines one successful methodology to establish warm-season grasses and forbs on abandoned mine lands in Missouri. The methodology can be successfully adapted for reclamation of all drastically disturbed lands including Title V lands under the Surface Mining Control Reclamation Act of 1977 (PL95-87) to promote ecosystem diversity and stability.« less

  20. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  1. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  2. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  3. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  4. 30 CFR 874.12 - Eligible coal lands and water.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Eligible coal lands and water. 874.12 Section... INTERIOR ABANDONED MINE LAND RECLAMATION GENERAL RECLAMATION REQUIREMENTS § 874.12 Eligible coal lands and water. Coal lands and water are eligible for reclamation activities if— (a) They were mined for coal or...

  5. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  6. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  7. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  8. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  9. 76 FR 66964 - Notice of Proposed Information Collection for 1029-0036

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... Requirements for Reclamation and Operation Plan. This information collection activity was previously approved... Requirements for Reclamation and Operation Plan. OSM will request a 3-year term of approval for this... Reclamation and Operation Plan. OMB Control Number: 1029-0036. Summary: Sections 507(b), 508(a), 510(b), 515(b...

  10. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, Kosol; VanGeet, Otto; Stoltenberg, Blaise

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  11. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... opportunities for water conservation through structural or non-structural approaches and demonstration... determine whether to recommend that a proposed rural water supply project be authorized for construction... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.49...

  12. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  13. 30 CFR 884.17 - Other uses by certified States and Indian tribes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... tribes. 884.17 Section 884.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... certified States and Indian tribes. (a) The State reclamation plan may provide for construction of specific... applications for uses other than coal reclamation by certified States and Indian tribes may be submitted in...

  14. Agricultural field reclamation utilizing native grass crop production

    Treesearch

    J. Cure

    2013-01-01

    Developing a method of agricultural field reclamation to native grasses in the Lower San Pedro Watershed could prove to be a valuable tool for educational and practical purposes. Agricultural field reclamation utilizing native grass crop production will address water table depletion, soil degradation and the economic viability of the communities within the watershed....

  15. 43 CFR 422.10 - Requirements for authorizing officers to exercise Reclamation law enforcement authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Requirements for authorizing officers to exercise Reclamation law enforcement authority. 422.10 Section 422.10 Public Lands: Interior Regulations... exercise Reclamation law enforcement authority. (a) The CLEO must ensure that each officer receiving an...

  16. 78 FR 66671 - Oklahoma Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 936...; S2D2SSS08011000SX066A00033F13XS501520] Oklahoma Regulatory Program AGENCY: Office of Surface Mining Reclamation and Enforcement... amendment. SUMMARY: We, the Office of Surface Mining Reclamation and Enforcement (OSM), are announcing...

  17. 30 CFR 886.17 - How can my grant be amended?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false How can my grant be amended? 886.17 Section 886.17 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.17 How can...

  18. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...

  19. 77 FR 52758 - Agency Information Collection Activities under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... OMB Review; Renewal of a Currently Approved Collection; Reclamation Rural Water Supply Program AGENCY... and Budget (OMB) for review and approval: Reclamation Rural Water Supply Program, OMB Control Number... Supply Program (Rural Water Program) to submit information to allow the Bureau of Reclamation to evaluate...

  20. 30 CFR 780.23 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 780.23... PLAN § 780.23 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  1. 30 CFR 784.15 - Reclamation plan: Land use information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... If the premining use of the land was changed within 5 years before the anticipated date of beginning... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Reclamation plan: Land use information. 784.15... PLAN § 784.15 Reclamation plan: Land use information. (a) The plan shall contain a statement of the...

  2. 43 CFR 423.13 - How will Reclamation establish periodic and regular closures?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.13 How will Reclamation... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation establish periodic and regular closures? 423.13 Section 423.13 Public Lands: Interior Regulations Relating to Public...

  3. 30 CFR 880.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... whose purpose is to control or extinguish fires in coal formations. (h) Reclamation plan or State reclamation plan means a plan that a State or Indian tribe submitted and that we approved under section 405 of... LAND RECLAMATION MINE FIRE CONTROL § 880.5 Definitions. As used in the regulations in this part and in...

  4. 30 CFR 880.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... whose purpose is to control or extinguish fires in coal formations. (h) Reclamation plan or State reclamation plan means a plan that a State or Indian tribe submitted and that we approved under section 405 of... LAND RECLAMATION MINE FIRE CONTROL § 880.5 Definitions. As used in the regulations in this part and in...

  5. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What are the consequences for using Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  6. 30 CFR 906.20 - Approval of Colorado abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Colorado abandoned mine land reclamation plan. 906.20 Section 906.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE COLORADO...

  7. Chapter 2: The forestry reclamation approach

    Treesearch

    Jim Burger; Don Graves; Patrick Angel; Vic Davis; Carl Zipper

    2017-01-01

    The Forestry Reclamation Approach (FRA) is a method for reclaiming coal-mined land to forest under the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA). The FRA is based on knowledge gained from both scientific research and experience (Fig. 2-1). The FRA can achieve cost-effective regulatory compliance for mine operators while creating productive...

  8. Determination of optimal environmental policy for reclamation of land unearthed in lignite mines - Strategy and tactics

    NASA Astrophysics Data System (ADS)

    Batzias, Dimitris F.; Pollalis, Yannis A.

    2012-12-01

    In this paper, optimal environmental policy for reclamation of land unearthed in lignite mines is defined as a strategic target. The tactics concerning the achievement of this target, includes estimation of optimal time lag between each lignite site (which is a segment of the whole lignite field) complete exploitation and its reclamation. Subsidizing of reclamation has been determined as a function of this time lag and relevant implementation is presented for parameter values valid for the Greek economy. We proved that the methodology we have developed gives reasonable quantitative results within the norms imposed by legislation. Moreover, the interconnection between strategy and tactics becomes evident, since the former causes the latter by deduction and the latter revises the former by induction in the time course of land reclamation.

  9. Response of soil physicochemical properties and enzyme activities to long-term reclamation of coastal saline soil, Eastern China.

    PubMed

    Xie, Xuefeng; Pu, Lijie; Wang, Qiqi; Zhu, Ming; Xu, Yan; Zhang, Meng

    2017-12-31

    Soil enzyme activity during different years of reclamation and land use patterns could indicate changes in soil quality. The objective of this research is to explore the dynamics of 5 soil enzyme activities (dehydrogenase, amylase, urease, acid phosphatase and alkaline phosphatase) involved in C, N, and P cycling and their responses to changes in soil physicochemical properties resulting from long-term reclamation of coastal saline soil. Soil samples from a total of 55 sites were collected from a coastal reclamation area with different years of reclamation (0, 7, 32, 40, 63a) in this study. The results showed that both long-term reclamation and land use patterns have significant effects on soil physicochemical properties and enzyme activities. Compared with the bare flat, soil water content, soil bulk density, pH and electrical conductivity showed a decreasing trend after reclamation, whereas soil organic carbon, total nitrogen and total phosphorus tended to increase. Dehydrogenase, amylase and acid phosphatase activities initially increased and then decreased with increasing years of reclamation, whereas urease and alkaline phosphatase activities were characterized by an increase-decrease-increase trend. Moreover, urease, acid phosphatase and alkaline phosphatase activities exhibited significant differences between coastal saline soil with 63years of reclamation and bare flat, whereas dehydrogenase and amylase activities remained unchanged. Aquaculture ponds showed higher soil water content, pH and EC but lower soil organic carbon, total nitrogen and total phosphorus than rapeseed, broad bean and wheat fields. Rapeseed, broad bean and wheat fields displayed higher urease and alkaline phosphatase activities and lower dehydrogenase, amylase and acid phosphatase activities compared with aquaculture ponds. Redundancy analysis revealed that the soil physicochemical properties explained 74.5% of the variation in soil enzyme activities and that an obvious relationship existed between soil nutrients and soil enzyme activities. These results will assist governmental evaluation of the quality of reclaimed coastal soil. Copyright © 2017 Elsevier B.V. All rights reserved.

  10. The impacts of land reclamation on suspended-sediment dynamics in Jiaozhou Bay, Qingdao, China

    NASA Astrophysics Data System (ADS)

    Gao, Guan Dong; Wang, Xiao Hua; Bao, Xian Wen; Song, Dehai; Lin, Xiao Pei; Qiao, Lu Lu

    2018-06-01

    A three-dimensional, high-resolution tidal model coupled with the UNSW sediment model (UNSW-Sed) based on Finite Volume Coastal Ocean Model (FVCOM) was set up to study the suspended-sediment dynamics and its change in Jiaozhou Bay (JZB) due to land reclamation over the period 1935 to 2008. During the past decades, a large amount of tidal flats were lost due to land reclamation. Other than modulating the tides, the tidal flats are a primary source for sediment resuspensions, leading to turbidity maxima nearshore. The tidal dynamics are dominant in controlling the suspended-sediment dynamics in JZB and have experienced significant changes with the loss of tidal flats due to the land reclamation. The sediment model coupled with the tide model was used to investigate the changes in suspended-sediment dynamics due to the land reclamation from 1935 to 2008, including suspended-sediment concentrations (SSC) and the horizontal suspended-sediment fluxes. This model can predict the general patterns of the spatial and temporal variation of SSC. The model was applied to investigate how the net transport of suspended sediments between JZB and its adjacent sea areas changed with land reclamation: in 1935 the net movement of suspended sediments was from JZB to the adjacent sea (erosion for JZB), primarily caused by horizontal advection associated with a horizontal gradient in the SSC; This seaward transport (erosion for JZB) had gradually declined from 1935 to 2008. If land reclamation on a large scale is continued in future, the net transport between JZB and the adjacent sea would turn landward and JZB would switch from erosion to siltation due to the impact of land reclamation on the horizontal advection of suspended sediments. We also evaluate the primary physical mechanisms including advection of suspended sediments, settling lag and tidal asymmetry, which control the suspended-sediment dynamics with the process of land reclamation.

  11. Disputes over science and dispute resolution approaches - A survey of Bureau of Reclamation employees

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily W.

    2012-01-01

    Water resources in parts of the Western United States are over-allocated, which intensifies the pressure to support water management decisions with strong scientific evidence. Because scientific studies sometimes provide uncertain or competing results or recommendations, science can become a source of disputes during decision-making processes. The Bureau of Reclamation (Reclamation) is an important water manager in the Western United States, and Reclamation decision processes are often contested by a variety of affected constituencies. We conducted a Web-based survey of Reclamation employees to determine (1) which types of disputes over science are occurring and how common they are, (2) which approaches have been used by Reclamation to try to resolve these different types of disputes, (3) how useful Reclamation employees find these approaches at resolving these types of disputes, (4) the final outcomes of these disputes and the decision-making processes that were hindered by the disputes over science, and (5) the potential usefulness of several different types of dispute resolution resources that Reclamation could provide for employees that become involved in disputes over science. The calculated minimum response rate for the survey was 59 percent. Twenty-five percent of respondents indicated that they had been involved in a dispute over science while working at Reclamation. Native species and species listed under the Endangered Species Act of 1973 were the most common issue types reported in these disputes over science. Survey respondents indicated that they used a variety of approaches to resolve disputes over science and rated most approaches as either neutral or somewhat helpful in these endeavors. Future research is needed to determine whether there are additional variables underlying these disputes that were not measured in this survey that may identify when dispute resolution methods are most effective, or whether resolving aspects of these disputes, such as differing interpretations of science, is very difficult or impossible regardless of the dispute resolution methods used.

  12. Effects of surface coal mining and reclamation on the geohydrology of six small watersheds in West-Central Indiana

    USGS Publications Warehouse

    Martin, Jeffrey D.; Duwelius, Richard F.; Crawford, Charles G.

    1990-01-01

    Hydrologic effects of mining and reclamation were identified by comparing the hydrologic systems at mined and reclaimed watersheds with those at unmined agricultural watersheds. The presence or absence of a large final-cut lake in the reclaimed watershed greatly influences the hydrologic systems and the effects of mining and reclamation. Surface coal mining and reclamation can decrease base flow, annual runoff, and peak flow rates; increase the variability of flow and recharge to the bedrock; reestablish the premining relation between surface- and ground-water divides; and lower the water table in upland areas.

  13. The reclamation of Indian and Abrams creeks in Great Smoky Mountains National Park

    USGS Publications Warehouse

    Lennon, Robert E.; Parker, Phillip S.

    1959-01-01

    A complete program of stream reclamation was developed and applied on Indian and Abrams creeks in Great Smoky Mountains National Park. A salt-resistivity technique was used to estimate the dilution and velocity of a toxicant in running water. Streamside toxicity trials on resident fishes established minimal, effective concentrations of the rotenone material. The successful removals of undesirable fish were followed by restocking with selected strains of eastern brook trout and rainbow trout. Post-reclamation observations demonstrated enhanced survival, growth, reproduction, and catch of trout. Factors which might limit the effectiveness of stream reclamation programs ar e discussed.

  14. Development assessment of wash water reclamation

    NASA Technical Reports Server (NTRS)

    Putnam, D. F.

    1976-01-01

    An analytical study assessment of state-of-the-art wash water reclamation technology is presented. It covers all non-phase-change unit operations, unit processes and subsystems currently under development by NASA. Each approach to wash water reclamation is described in detail. Performance data are given together with the projected weights and sizes of key components and subsystems. It is concluded that a simple multifiltration subsystem composed of surface-type cartridge filters, carbon adsorption and ion exchange resins is the most attractive approach for spacecraft wash water reclamation in earth orbital missions of up to 10 years in duration.

  15. Biodegradation of N-nitrosodimethylamine in soil from a water reclamation facility

    USGS Publications Warehouse

    Bradley, Paul M.; Carr, Steve A.; Baird, Rodger B.; Chapelle, Francis H.

    2005-01-01

    The potential introduction of N-nitrosodimethylamine (NDMA) into groundwater during water reclamation activities poses a significant risk to groundwater drinking supplies. Greater than 54% biodegradation of N-[methyl-14C]NDMA to 14CO2 or to 14CO2 and 14CH4 was observed in soil from a water reclamation facility under oxic or anoxic conditions, respectively. Likewise, biodegradation was significant in microcosms containing soil with no history of NDMA contamination. These results indicate that aerobic and anaerobic biodegradation of NDMA may be an effective component of NDMA attenuation in water reclamation facility soils.

  16. Student Responses to the Women's Reclamation Work in the Philosophy of Education

    ERIC Educational Resources Information Center

    Wojcik, Teresa Genevieve; Titone, Connie

    2013-01-01

    Reclamation work denotes the process of uncovering the lost contributions of women to the philosophy of education, analyzing their works, making them accessible to a larger audience, and (re)introducing them to the historical record and canon. Since the 1970s, scholars have been engaged in the reclamation work, thus making available to students,…

  17. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determine if a feasibility study is ready for review? 404.48 Section 404.48 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a feasibility study is ready for review? (a) Reclamation will evaluate whether the feasibility study adequately...

  18. Current reclamation practices after oil and gas development do not speed up succession or plant community recovery in big sagebrush ecosystems in Wyoming

    USDA-ARS?s Scientific Manuscript database

    Reclamation is an application of treatment(s) following disturbance to promote succession and accelerate the return of target conditions. Previous studies have framed reclamation in the context of succession by studying its effectiveness in re-establishing late-successional plant communities. Re-est...

  19. 76 FR 58035 - Notice of Inventory Completion: U.S. Department of the Interior, Bureau of Reclamation, Phoenix...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    .... Department of the Interior, Bureau of Reclamation, Phoenix Area Office, Phoenix, AZ and Arizona State Museum... Bureau of Reclamation, Phoenix Area Office and Arizona State Museum have completed an inventory of a... in the physical custody of the Arizona State Museum, University of Arizona, Tucson, AZ. The human...

  20. 43 CFR 404.28 - Is it possible to expedite the completion of an appraisal investigation or feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... served by a proposed rural water supply project has urgent and compelling water needs, Reclamation will... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.28 Is it possible to expedite the completion of an appraisal investigation...

  1. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  2. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  3. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  4. 30 CFR 935.25 - Approval of Ohio abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Plan to provide for the reclamation of areas causing acid mine drainage AMD and to revise the project... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Approval of Ohio abandoned mine land... STATE OHIO § 935.25 Approval of Ohio abandoned mine land reclamation plan amendments. The following is a...

  5. 78 FR 54910 - Notice of Intent To Prepare an Environmental Impact Statement and Public Scoping Meetings for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1523-2000-229-00-0-1, 3205000] Notice of... Apache Tribe Rural Water System Project, Arizona AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... Act of 2010), the United States Congress authorized and directed Reclamation to plan, design, and...

  6. 31 CFR 240.9 - Reclamation procedures; reclamation protests.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation debt through offset in accordance with §§ 240.10 and 240.11. (5) Effect of protest decision. The..., by filing a protest in accordance with § 240.9(b), request Treasury to review its decision that the... debtor of Treasury's decision. In those cases where it is not possible to render a decision within 60...

  7. 30 CFR 886.18 - What audit and administrative requirements must I meet?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false What audit and administrative requirements must I meet? 886.18 Section 886.18 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION RECLAMATION GRANTS FOR UNCERTIFIED STATES AND INDIAN TRIBES § 886.18 What audit and...

  8. 30 CFR 902.20 - Approval of Alaska abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Approval of Alaska abandoned mine land reclamation plan. 902.20 Section 902.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT..., Denver, Colorado 80202-5733. [60 FR 33724, June 29, 1995, as amended at 60 FR 54593, Oct. 25, 1995] ...

  9. Interferometric SAR for characterization of ravines as a function of their density, depth, and surface cover

    NASA Astrophysics Data System (ADS)

    Chatterjee, R. S.; Saha, S. K.; Suresh Kumar; Sharika Mathew; Lakhera, R. C.; Dadhwal, V. K.

    In recent years, the problem of ravine erosion with consequent loss of usable land has received much attention worldwide. The Chambal ravine zone in India is well known for being an extremely intricate, deeply incised network of ravines in a 10 km wide zone on the flanks of the Chambal River. It occupies an area of ˜0.5 million hectares at the expense of fertile agricultural land of the Chambal Valley. The broad grouping of the ravines considering their reclamation potential, as carried out by previous workers based on visual interpretation of optical remote sensing data, is mostly descriptive in nature. In the present study, characterization of the ravines as a function of their erosion potential expressed through ravine density, ravine depth, and ravine surface cover was made in quantitative terms exploiting the preferential characteristics of side-looking, long-wavelength, coherent SAR signal and precision measurements associated with the InSAR technique. The outlines of ravines appear remarkably prominent in SAR backscattered amplitude images due to the high sensitivity of the SAR signal to terrain ruggedness. Using local statistics-based meso and macro textural information of SAR backscattered amplitude images in 7×7 pixel windows (the pixel size being 20 m×20 m), the ravine-affected area has been classified into three density classes, namely low, moderate, and high density ravine classes. C-band InSAR digital elevation models (DEMs) of sparsely vegetated ravine areas essentially give the terrain height. From the pixel-by-pixel terrain height, the ravine depth was calculated by differencing the maximum and minimum terrain heights of the pixels in a 100 m distance range. Considering the vertical precision of the ERS InSAR DEMs of ˜5 m and ravine depth classification by previous workers [Sharma, H.S., 1968. Genesis and pattern of ravines of the Lower Chambal Valley, India. Special Issue. 21st International Geographical Union Congress 30(4), 14-24; Seth, S.P., Bhatnagar, R.K., Chauhan, S.S., 1969. Reclamability classification and nature of ravines of Chambal Command Areas. Journal of Soil and Water Conservation in India 17 (3-4), 39-44.], three depth classes, namely shallow (<5 m), moderately deep (5-20 m), and deep (>20 m) ravines, were made. Using the temporal decorrelation property of the close time interval InSAR data pair, namely the ERS SAR tandem pair, four ravine surface cover classes, namely barren land, grass/scrub/crop land, sparse vegetation, and wet land/dense vegetation, could be delineated, which was corroborated by the spectral signatures in the optical range and selective ground truths.

  10. Study on the cumulative impact of reclamation activities on ecosystem health in coastal waters.

    PubMed

    Shen, Chengcheng; Shi, Honghua; Zheng, Wei; Li, Fen; Peng, Shitao; Ding, Dewen

    2016-02-15

    The purpose of this study is to develop feasible tools to investigate the cumulative impact of reclamations on coastal ecosystem health, so that the strategies of ecosystem-based management can be applied in the coastal zone. An indicator system and model were proposed to assess the cumulative impact synthetically. Two coastal water bodies, namely Laizhou Bay (LZB) and Tianjin coastal waters (TCW), in the Bohai Sea of China were studied and compared, each in a different phase of reclamations. Case studies showed that the indicator scores of coastal ecosystem health in LZB and TCW were 0.75 and 0.68 out of 1.0, respectively. It can be concluded that coastal reclamations have a historically cumulative effect on benthic environment, whose degree is larger than that on aquatic environment. The ecosystem-based management of coastal reclamations should emphasize the spatially and industrially intensive layout. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  12. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  13. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  14. 43 CFR 3809.598 - What if the amount forfeited will not cover the cost of reclamation?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false What if the amount forfeited will not cover the cost of reclamation? 3809.598 Section 3809.598 Public Lands: Interior Regulations Relating to....598 What if the amount forfeited will not cover the cost of reclamation? If the amount forfeited is...

  15. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Federal cost-share required for a feasibility study? 404.34 Section 404.34 Public Lands: Interior... for a feasibility study? Yes. Reclamation may reduce the non-Federal cost-share required for a feasibility study to an amount less than 50 percent of the study costs if: (a) Reclamation determines that...

  16. 43 CFR 404.24 - How will Reclamation determine whether it is cost-effective for me or my contractor to conduct...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Reclamation will notify you in writing of its determination regarding the cost-effectiveness of your proposal... is cost-effective for me or my contractor to conduct the appraisal investigation or feasibility study... Reclamation determine whether it is cost-effective for me or my contractor to conduct the appraisal...

  17. 77 FR 65403 - Public Land Order No. 7804; Partial Revocation of a Secretarial Order Dated December 4, 1909; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Secretarial Order insofar as it affects 78.69 acres of National Forest System land withdrawn on behalf of the Bureau of Reclamation for the Payette Boise Reclamation Project within the Boise National Forest. This... Payette Boise Reclamation Project within the Boise National Forest is no longer used for the purpose for...

  18. An evaluation of reclamation tree planting in southwest Virginia

    Treesearch

    Danny R. Brown; Donald L. Branson

    1980-01-01

    Surface mining began in Southwest Virginia in the mid-1940's, however, few or no records were kept before 1950 and it was not until 1966 that the first Virginia reclamation law was passed. Two years later in 1968, the Division of Mined Land Reclamation was created and tree planting began on a uniform basis in Virginia surface mines.

  19. 43 CFR 404.39 - What factors will Reclamation consider in evaluating my capability to pay 25 percent or more of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.39 What factors will Reclamation consider in... from water sales minus payments to supplies and employees); (7) Current (current bonds payable and... governments; (e) The existing cost of water and the cost to develop new water supplies in the region; and (f...

  20. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...

  1. 78 FR 28894 - Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [NEW 149341 and NEW 179095] Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955, and Transfer of... Land Order. SUMMARY: This order revokes in-part a withdrawal created by a Bureau of Reclamation Order...

  2. Mechanization for Optimal Landscape Reclamation

    NASA Astrophysics Data System (ADS)

    Vondráčková, Terezie; Voštová, Věra; Kraus, Michal

    2017-12-01

    Reclamation is a method of ultimate utilization of land adversely affected by mining or other industrial activity. The paper explains the types of reclamation and the term “optimal reclamation”. Technological options of the long-lasting process of mine dumps reclamation starting with the removal of overlying rocks, transport and backfilling up to the follow-up remodelling of the mine dumps terrain. Technological units and equipment for stripping flow division. Stripping flow solution with respect to optimal reclamation. We recommend that the application of logistic chains and mining simulation with follow-up reclamation to open-pit mines be used for the implementation of optimal reclamation. In addition to a database of local heterogeneities of the stripped soil and reclaimed land, the flow of earths should be resolved in a manner allowing the most suitable soil substrate to be created for the restoration of agricultural and forest land on mine dumps. The methodology under development for the solution of a number of problems, including the geological survey of overlying rocks, extraction of stripping, their transport and backfilling in specified locations with the follow-up deployment of goal-directed reclamation. It will make possible to reduce the financial resources needed for the complex process chain by utilizing GIS, GPS and DGPS technologies, logistic tools and synergistic effects. When selecting machines for transport, moving and spreading of earths, various points of view and aspects must be taken into account. Among such aspects are e.g. the kind of earth to be operated by the respective construction machine, the kind of work activities to be performed, the machine’s capacity, the option to control the machine’s implement and economic aspects and clients’ requirements. All these points of view must be considered in the decision-making process so that the selected machine is capable of executing the required activity and that the use of an unsuitable machine is eliminated as it would result in a delay and increase in the project costs. Therefore, reclamation always includes extensive earth-moving work activities restoring the required relief of the land being reclaimed. Using the earth-moving machine capacity, the kind of soil in mine dumps, the kind of the work activity performed and the machine design, a SW application has been developed that allows the most suitable machine for the respective work technology to be selected with a view to preparing the land intended for reclamation.

  3. 43 CFR 423.14 - How will Reclamation post and delineate closed areas at the site of the closure?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... closed areas at the site of the closure? 423.14 Section 423.14 Public Lands: Interior Regulations... RECLAMATION FACILITIES, LANDS, AND WATERBODIES Areas Open and Closed to Public Use § 423.14 How will Reclamation post and delineate closed areas at the site of the closure? Before or at the time of closing all...

  4. Characteristics of labile organic carbon fractions in reclaimed mine soils: Evidence from three reclaimed forests in the Pingshuo opencast coal mine, China.

    PubMed

    Yuan, Ye; Zhao, Zhongqiu; Li, Xuezhen; Wang, Yangyang; Bai, Zhongke

    2018-02-01

    The reclamation of discarded spoils has the potential to stimulate carbon (C) sequestration in reclaimed mine soils (RMSs). Nevertheless, to date the temporal dynamics of labile organic C fractions have not been sufficiently elucidated in RMSs. In this study, soil organic carbon (SOC) and labile organic C fractions, including microbial biomass organic C (MBC), easily oxidizable organic C (EOC) and dissolved organic C (DOC), were determined in Robinia pseudoacacia monoculture forests (reclamation periods of 0, 8, 10, 13, 15, 18 and 30years), Pinus tabuliformis forests (reclamation periods of 0, 10, 19, 23 and 25years) and Ulmus pumila forests (reclamation periods of 0, 18, 20 and 22years) situated on RMSs in the Pingshuo opencast coal mine, China. Changes in labile organic C fractions within the soil profiles (0-100cm) were also identified at the 18- or 19-year plots under the three monoculture forests. Our results showed that, SOC and labile organic C fractions, together with soil microbial quotient (SMQ) and C management index (CMI), increased with time since reclamation, indicating that the quality of RMSs improved over time after initial reclamation under the three forest types. R. pseudoacacia significantly increased the accretion of SOC and EOC in the early stage of reclamation while P. tabuliformis accelerated the accumulation of the MBC fraction. Results for U. pumila indicated that this species had a better ability to store C in RMSs 10years or more after reclamation. SOC and labile organic C fractions both had S-shaped distributions within the soil profiles (0-100cm), with the 0-20cm layer recording the highest values (P<0.05). Labile organic C fractions were closely associated and correlated with soil physicochemical properties; our results also showed that nitrogen played an important role in the development of labile organic C fractions. Overall, reclamation accelerated the accretion of both SOC and labile organic C fractions, results of which varied among the reclaimed forests. Copyright © 2017 Elsevier B.V. All rights reserved.

  5. Assessing the Sustainable Development of Coastal Reclamation: A Case of Makassar Using GIS Application

    NASA Astrophysics Data System (ADS)

    Yurnita, A.; Trisutomo, S.; Ali, M.

    2017-07-01

    Reclamation has been made in many areas in Indonesia including Makassar, as a response to the present needs of land as the impact of human activity in urban area. This research aims to assess the sustainable development of coastal reclamation and focus on environmental dimension of sustainable urban development. Assessment will be done by reclamation sustainability index (RSI) and analysis by GIS as the tools. RSI was built from previous research that has simplified from many researches and analysis by Structure of Analytic Hierarchy Process (AHP) and expert choice. RSI uses 9 indices from three indicators of environment factor which are coastal resources, building and infrastructure.

  6. The utilisation of municipal waste compost for the reclamation of anthropogenic soils: implications on C dynamics.

    NASA Astrophysics Data System (ADS)

    Said-Pullicino, D.; Bol, R.; Gigliotti, G.

    2009-04-01

    The application of municipal waste compost (MWC) and other organic materials may serve to enhance soil fertility and increase C stocks of earthen materials and mine spoils used in land reclamation activities, particularly in the recovery of degraded areas left by exhausted quarries, mines, abandoned industrial zones, degraded natural areas and exhausted landfill sites. Such land management options may serve as a precondition for landscaping and reclamation of degraded areas, reforestation or agriculture. In fact, previous results have shown that compost application to the capping layer of a landfill covering soil significantly enhanced the fertility, evidenced by an improvement in soil structure, porosity and water holding capacity, an increase in the relative proportion of recalcitrant C pools and an increase in soil nutrient content, microbial activity and soil microbial biomass. Proper management of MWC requires a capacity to understand and predict their impacts on C dynamics in the field subsequent to application. Although numerous works deal with the effects of compost application in agricultural systems, little is known on how land rehabilitation practices effect C dynamics in such relatively young soil systems. The estimation of SOC pools and their potential turnover rates in land reclamation activities is fundamental to our understanding of terrestrial C dynamics. In the framework of a long-term field experiment, the objective of this work was to evaluate the temporal and spatial dynamics of compost-derived organic matter with respect to the major processes involved in organic matter cycling in an anthropogenic landfill covering soil originally amended with a single dose of MWC. We investigated long-term organic C dynamics in such systems by collecting samples at different depths over a 10 year chronosequence subsequent to compost application to the top layer of the landfill covering soil. Variations in the stable isotope composition (delta 13C) of the soil samples show that even after 10 years, amended topsoils were significantly enriched in compost-derived organic matter, confirming that the utilisation of such organic inputs in land reclamation activities has the potential to enhance the C stocks of degraded areas. The addition of compost to the superficial layer also resulted in a significant input of soluble organic compounds subject to leaching along the soil profile. Sorption isotherms for compost-derived water-extractable organic matter onto mineral materials used for landfill covering suggest that sorptive preservation was primarily responsible for the increase in C content and the shift in the C isotopic signature to values similar to that of the applied compost, in the deeper soil horizons over the 10 year experimental period. This was also confirmed by the accumulation of lignin-derived phenolic compounds. Nevertheless, analysis for non-cellulosic carbohydrates in soils samples and their respective water-extractable fractions suggest that a proportion of compost-derived, labile organic matter fraction is leached through the soil profile and potentially lost from the soil system, particularly in the years immediately after compost application.

  7. A guide to State programs for the reclamation of surface mined areas

    USGS Publications Warehouse

    Imhoff, Edgar A.; Friz, Thomas O.; LaFevers, James R.

    1976-01-01

    During 1975 inquiries of agencies in each State and review of State statutes and related administrative codes revealed that 38 States have established programs requiring the reclamation of surface mined lands. Results of analyses of those programs and ancillary data are presented in : (1) A table (matrix) which has been designed for the notation and elaboration of information pertaining to the mined-area reclamation programs of the 50 States; (2) a primer on surface mining activities and related reclamation practices and problems; and (3) a listing of types of non-Federal governmental controls applicable to reclamation. Interpretations of the status and content of State programs suggest that although a common thread runs through State statutory language, administrative requirements vary from State to State in order to meet different natural, economic, social, and political considerations. A general trend is seen in State programs toward the requiring of an integration of landuse planning and mine planning, with increased local governmental involvement.

  8. Impact of human activities on subaqueous topographic change in Lingding Bay of the Pearl River estuary, China, during 1955–2013

    PubMed Central

    Wu, Z. Y.; Saito, Yoshiki; Zhao, D. N.; Zhou, J. Q.; Cao, Z. Y.; Li, S. J.; Shang, J. H.; Liang, Y. Y.

    2016-01-01

    Estuaries have been sites of intensive human activities during the past century. Tracing the evolution of subaqueous topography in estuaries on a decadal timescale enables us to understand the effects of human activities on estuaries. Bathymetric data from 1955 to 2010 show that land reclamation decreased the subaqueous area of Lingding Bay, in the Pearl River estuary, by ~170 km2 and decreased its water volume by 615 × 106 m3, representing a net decrease of 11.2 × 106 m3 per year and indicating the deposition of approximately 14.5 Mt/yr of sediment in Lingding Bay during that period. Whereas Lingding Bay was mainly governed by natural processes with slight net deposition before 1980, subsequent dredging and large port engineering projects changed the subaqueous topography of the bay by shallowing its shoals and deepening its troughs. Between 2012 and 2013, continuous dredging and a surge of sand excavation resulted in local changes in water depth of ± 5 m/yr, far exceeding the magnitude of natural topographic evolution in Lingding Bay. Reclamation, dredging, and navigation-channel projects removed 8.4 Mt/yr of sediment from Lingding Bay, representing 29% of the sediment input to the bay, and these activities have increased recently. PMID:27886227

  9. Development and Application of Climate Services for Water Resources Planning and Management within the Department of Interior Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Raff, D. A.; Morgan, A.; Brekke, L. D.

    2014-12-01

    The Bureau of Reclamation is the nation's largest wholesale water supplier and the second largest producer of hydropower. Reclamation operates 337 reservoirs with a total storage capacity of 245 million acre-feet and operates 53 hydroelectric powerplants that annually produce, on average for the past 10 years, 40 billion kilowatt-hours. Reclamation is adapting to the impacts and future challenges posed by the changing climate through the development of new climate services as well as through cooperation with Federal, state, local, tribal, academic, and non-governmental partners in the use of climate and water resource information that may be available. Reclamation is utilizing this information within a strategy that has four goals: 1) Increase Water Management Flexibility, 2) Enhance Climate Adaptation Planning, 3) Improve Infrastructure Resiliency, and 4) Expand Information Sharing. Within this presentation we will focus on the utilization of climate services within each of these key goals of Reclamation's strategy. This includes the utilization of climate information to track and potentially improve reservoir management to increase water management flexibility, the development of climate informed hydrology that supports climate adaptation planning, use of climate information to inform decisions of infrastructure resilience, and climate services use for jointly informed water management decisions through education and web based services.

  10. Restoring Forests and Associated Ecosystem Services on Appalachian Coal Surface Mines

    NASA Astrophysics Data System (ADS)

    Zipper, Carl E.; Burger, James A.; Skousen, Jeffrey G.; Angel, Patrick N.; Barton, Christopher D.; Davis, Victor; Franklin, Jennifer A.

    2011-05-01

    Surface coal mining in Appalachia has caused extensive replacement of forest with non-forested land cover, much of which is unmanaged and unproductive. Although forested ecosystems are valued by society for both marketable products and ecosystem services, forests have not been restored on most Appalachian mined lands because traditional reclamation practices, encouraged by regulatory policies, created conditions poorly suited for reforestation. Reclamation scientists have studied productive forests growing on older mine sites, established forest vegetation experimentally on recent mines, and identified mine reclamation practices that encourage forest vegetation re-establishment. Based on these findings, they developed a Forestry Reclamation Approach (FRA) that can be employed by coal mining firms to restore forest vegetation. Scientists and mine regulators, working collaboratively, have communicated the FRA to the coal industry and to regulatory enforcement personnel. Today, the FRA is used routinely by many coal mining firms, and thousands of mined hectares have been reclaimed to restore productive mine soils and planted with native forest trees. Reclamation of coal mines using the FRA is expected to restore these lands' capabilities to provide forest-based ecosystem services, such as wood production, atmospheric carbon sequestration, wildlife habitat, watershed protection, and water quality protection to a greater extent than conventional reclamation practices.

  11. Impact of direct greenhouse gas emissions on the carbon footprint of water reclamation processes employing nitrification-denitrification.

    PubMed

    Schneider, Andrew G; Townsend-Small, Amy; Rosso, Diego

    2015-02-01

    Water reclamation has the potential to reduce water supply demands from aquifers and more energy-intensive water production methods (e.g., seawater desalination). However, water reclamation via biological nitrification-denitrification is also associated with the direct emission of the greenhouse gases (GHGs) CO₂, N₂O, and CH₄. We quantified these direct emissions from the nitrification-denitrification reactors of a water reclamation plant in Southern California, and measured the (14)C content of the CO₂ to distinguish between short- and long-lived carbon. The total emissions were 1.5 (±0.2) g-fossil CO₂ m(-3) of wastewater treated, 0.5 (±0.1) g-CO₂-eq of CH₄ m(-3), and 1.8 (±0.5) g-CO₂-eq of N₂O m(-3), for a total of 3.9 (±0.5) g-CO₂-eqm(-3). This demonstrated that water reclamation can be a source of GHGs from long lived carbon, and thus a candidate for GHG reduction credit. From the (14)C measurements, we found that between 11.4% and 15.1% of the CO₂ directly emitted was derived from fossil sources, which challenges past assumptions that the direct CO₂ emissions from water reclamation contain only modern carbon. A comparison of our direct emission measurements with estimates of indirect emissions from several water production methods, however, showed that the direct emissions from water reclamation constitute only a small fraction of the plant's total GHG footprint. Copyright © 2014 Elsevier B.V. All rights reserved.

  12. 30 CFR 780.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.4...

  13. 30 CFR 784.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.4...

  14. 30 CFR 784.29 - Diversions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.29...

  15. 30 CFR 784.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.2...

  16. 30 CFR 780.29 - Diversions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.29 Diversions...

  17. 30 CFR 780.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.2 Objectives...

  18. Occurrence and removal of pharmaceuticals, hormones, personal care products, and endocrine disrupters in a full-scale water reclamation plant.

    PubMed

    Tran, Ngoc Han; Gin, Karina Yew-Hoong

    2017-12-01

    This study provided the first comprehensive data on the occurrence and removal of twenty-five target emerging contaminants (ECs) in a full-scale water reclamation plant (WRP) in the Southeast Asian region. Nineteen out of the twenty-five ECs were ubiquitously detected in raw influent samples. Concentrations of the detected ECs in raw influent samples ranged substantially from 44.3 to 124,966ng/L, depending upon the compound and sampling date. The elimination of ECs in full-scale conventional activated sludge (CAS) and membrane bioreactor (MBR) systems at a local WRP was evaluated and compared. Several ECs, such as acetaminophen, atenolol, fenoprofen, indomethacin, ibuprofen, and oxybenzone, exhibited excellent removal efficiencies (>90%) in biological wastewater treatment processes, while some of the investigated compounds (carbamazepine, crotamiton, diclofenac, and iopamidol) appeared to be persistent in the both CAS and MBR systems. Field-based monitoring results showed that MBR outperformed CAS in the elimination of most target ECs. The relationship between molecular characteristics of ECs (i.e. physicochemical properties and structural features) and their removal efficiencies during biological wastewater treatment was also elucidated. Excellent removal efficiencies (>90%) were often noted for ECs with the sole presence of electron donating groups (i.e. phenolic [OH], amine [NH 2 ], methoxy [OCH 3 ], phenoxy [OC 6 H 5 ], or alkyl groups). Conversely, ECs with the absence of electron donating groups or the predominance of strong electron withdrawing groups (e.g. halogenated, carbonyl, carboxyl, and sulfonamide) tended to show poor removal efficiencies (<30%) in biological wastewater treatment processes. Copyright © 2017 Elsevier B.V. All rights reserved.

  19. Selecting Proper Plant Species for Mine Reclamation Using Fuzzy AHP Approach (Case Study: Chadormaloo Iron Mine of Iran)

    NASA Astrophysics Data System (ADS)

    Ebrahimabadi, Arash

    2016-12-01

    This paper describes an effective approach to select suitable plant species for reclamation of mined lands in Chadormaloo iron mine which is located in central part of Iran, near the city of Bafgh in Yazd province. After mine's total reserves are excavated, the mine requires to be permanently closed and reclaimed. Mine reclamation and post-mining land-use are the main issues in the phase of mine closure. In general, among various scenarios for mine reclamation process, i.e. planting, agriculture, forestry, residency, tourist attraction, etc., planting is the oldest and commonly-used technology for the reclamation of lands damaged by mining activities. Planting and vegetation play a major role in restoring productivity, ecosystem stability and biological diversity to degraded areas, therefore the main goal of this research work is to choose proper and suitable plants compatible with the conditions of Chadormaloo mined area, providing consistent conditions for future use. To ensure the sustainability of the reclaimed landscape, the most suitable plant species adapted to the mine conditions are selected. Plant species selection is a Multi Criteria Decision Making (MCDM) problem. In this paper, a fuzzy MCDM technique, namely Fuzzy Analytic Hierarchy Process (FAHP) is developed to assist chadormaloo iron mine managers and designers in the process of plant type selection for reclamation of the mine under fuzzy environment where the vagueness and uncertainty are taken into account with linguistic variables parameterized by triangular fuzzy numbers. The results achieved from using FAHP approach demonstrate that the most proper plant species are ranked as Artemisia sieberi, Salsola yazdiana, Halophytes types, and Zygophyllum, respectively for reclamation of Chadormaloo iron mine.

  20. Fouling characteristics of reverse osmosis membranes at different positions of a full-scale plant for municipal wastewater reclamation.

    PubMed

    Tang, Fang; Hu, Hong-Ying; Sun, Li-Juan; Sun, Ying-Xue; Shi, Na; Crittenden, John C

    2016-03-01

    Membrane fouling is an important shortcoming limiting the efficiency and wide application of reverse osmosis (RO) technology. In this paper, RO membranes in a full-scale municipal wastewater reclamation plant were autopsied. From the lead to tail position RO membranes in RO system, both of organic and inorganic matters on membranes reduced gradually. The higher ion products in RO concentrate didn't result in more serious inorganic scaling on the last position RO membranes, which was contrast with some other researches. Fe, Ca and Mg were major inorganic elements. Fe had a relatively low concentration in RO influent but the highest content on membranes. However, there was no specific pretreatment in terms of Fe removal. Ca and Mg scaling was controlled by the antiscalants injected. Organic fouling (75.0-84.5% of dry weights) was major problem on RO membranes due to the large amount of dissolved organic matters in secondary effluent as raw water. Hydrophilic acid (HIA, 48.0% of total DOC), hydrophobic acid (HOA, 23.6%) and hydrophobic neutral (HON, 19.0%) fraction was largest among the six fractions in RO influent, while HON (38.2-51.1%) and HOA (22.1-26.1%) tended to accumulate on membranes in higher quantities. Monitoring HON and HOA might help to forecast organic fouling. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. National Metal Casting Research Institute final report. Volume 1, Sand reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vondra, L.F.; Burningham, J.S.

    1995-08-01

    A mobile thermal foundry sand reclamation unit was designed and constructed. This unit consisted of thermal and mechanical sand reclamation equipment installed on the bed of a 50 foot low-boy trailer. It was transported to a number of Midwest foundries for on-site demonstration of the sand reclamation process. This allowed participating foundries to have their own refuse sand (10-100 tons) processed and then reused in production for evaluation. The purpose for building the unit was to demonstrate to foundries through ``hands on`` experience that refuse sands can be reclaimed and successfully reused particularly in regard to product quality. Most ofmore » the participating foundries indicated a high level of satisfaction with the reclaimed sand. Laboratory testing of samples of the used sand, before and after processing by the demonstration unit, verified the usability of the reclaimed sand. One of the foundries participating was a brass foundry, the sand from this foundry contained lead and is classified as a hazardous material. After reclamation the sand was no longer hazardous and could also be reused in the foundry.« less

  2. Microbial turnover and incorporation of organic compounds in oil sand mining reclamation sites

    NASA Astrophysics Data System (ADS)

    Lappé, M.; Kallmeyer, J.

    2013-12-01

    Microorganisms play an important role in the development of new soils and in the reclamation of disturbed landscapes. Especially in hydrocarbon-contaminated soils their ability to degrade organic matter and pollutants makes them essential to re-establish full ecosystem functionality. Microbes are also involved in the mobilization of nutrients for plant growth and in the production of greenhouse gases. Reclamation sites from oil sand mining activities in Alberta, Canada, contain residual bitumen as well as other hydrocarbons. So, these areas provide a great opportunity to study microbial degradation of residual contaminants from oil sand. To get an impression of degradation rates as well as metabolic pathways, incubation experiments were performed in the lab. We measured microbial turnover (catabolic metabolism) and incorporation (anabolic metabolism) rates of different common organic compounds in samples from differently treated reclamation sites - with plant cover and without plant cover. About 10 g of sample material was suspended in 10 mL of a solution that mimics the in-situ concentration of dissolved ions. Radioactively labelled 14C-acetate was added as a common substrate, whereas 14C-naphthenic acid was chosen to investigate the microbial community's capability to utilize a typical hydrocarbon pollutant in oil sand tailings as a nutrient source. To test for the influence of fertilizers on microbial activity, phosphate, nitrate and potassium were added to some samples in different combinations. Incubations were run over two different time periods (7 and 14 days). At the end of each incubation experiment, the amount of produced 14CO2, 14C incorporated into the cells and the remaining unreacted 14C in the slurry were measured. First results show that most of the added 14C-acetate is used for respiration as it is mostly released as 14CO2. In upper soil layers only about 3% of 14C is incorporated into cells, whereas in deeper horizons with lower cell abundances about 14% of 14C is used to build up biomass. The results also show that microorganisms use 14C-naphthenic acid as a carbon source, but at a lower rate. About half of the degraded naphthenic acid is incorporated into cells; the other half is released as 14CO2. The results give an impression of how fast and to what amount microorganisms can degrade residual oil compounds. Additionally, our study allows for rough estimates of greenhouse gas emissions of reclamation areas.

  3. Ohio's Abandoned Mine Lands Reclamation Program: a Study of Data Collection and Evaluation Techniques

    NASA Technical Reports Server (NTRS)

    Sperry, S. L.

    1982-01-01

    The planning process for a statewide reclamation plan of Ohio abandoned minelands in response to the Federal Surface Mining Control and Reclamation Act of 1977 included: (1) the development of a screening and ranking methodology; (2) the establishment of a statewide review of major watersheds affected by mining; (3) the development of an immediate action process; and (4) a prototypical study of a priority watershed demonstrating the data collection, analysis, display and evaluation to be used for the remaining state watersheds. Historical methods for satisfying map information analysis and evaluation, as well as current methodologies being used were discussed. Various computer mapping and analysis programs were examined for their usability in evaluating the priority reclamation sites. Hand methods were chosen over automated procedures; intuitive evaluation was the primary reason.

  4. 36 CFR 9.11 - Reclamation requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MINERALS MANAGEMENT Mining and Mining Claims § 9.11 Reclamation requirements. (a) As contemporaneously as... reasonable flow of subsurface waters, the return of the area to a condition which does not jeopardize visitor...

  5. Energy Corner: Heat Reclamation Rescues Wasted Heat.

    ERIC Educational Resources Information Center

    Daugherty, Thomas

    1982-01-01

    Heat reclamation systems added to pre-existing central heating systems provide maximum savings at minimum cost. The benefits of a particular appliance marketed under the brand name "Energizer" are discussed. (Author/MLF)

  6. 30 CFR 914.20 - Approval of Indiana abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 1982. Copies of the approved plan are available at: (a) Indiana Department of Natural Resources... Reclamation and Enforcement, Indianapolis Field Office, Minton-Capehart Federal Building, Room 301, 575 North...

  7. 77 FR 46121 - Notice of Proposed Information Collection; General Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... jurisdiction of surface coal mining and reclamation operations, petitions for rulemaking, and citizen suits filed under the Surface Mining Control and Reclamation Act of 1977. Bureau Form Number: None. Frequency...

  8. Seed reserves diluted during surface soil reclamation in eastern Mojave Desert

    USGS Publications Warehouse

    Scoles-Sciulla, S. J.; DeFalco, L.A.

    2009-01-01

    Surface soil reclamation is used to increase the re-establishment of native vegetation following disturbance through preservation and eventual replacement of the indigenous seed reserves. Employed widely in the mining industry, soil reclamation has had variable success in re-establishing native vegetation in arid and semi-arid regions. We tested whether variable success could be due in part to a decrease of seed reserves during the reclamation process by measuring the change in abundance of germinable seed when surface soil was mechanically collected, stored in a soil pile for 4 months, and reapplied upon completion of a roadway. Overall seed reserve declines amounted to 86% of the original germinable seed in the soil. The greatest decrease in seed reserves occurred during soil collection (79% of original reserves), compared to the storage and reapplication stages. At nearby sites where stored surface soil had been reapplied, no perennial plant cover occurred from 0.5 to 5 years after application and <1% cover after 7 years compared to 5% cover in nearby undisturbed areas. The reduction in abundance of germinable seed during reclamation was primarily due to dilution of seed reserves when deeper soil fractions without seed were mixed with the surface soil during collection. Unless more precise techniques of surface soil collection are utilized, soil reclamation alone as a means for preserving native seed reserves is a method ill-suited for revegetating disturbed soils with a shallow seed bank, such as those found in the Mojave Desert. Copyright ?? Taylor & Francis Group, LLC.

  9. Full-depth repair of jointed PCC pavements cast-in-place and precast procedures.

    DOT National Transportation Integrated Search

    1976-01-01

    The deterioration of jointed portland cement concrete (PCC) pavements on the interstate system in Virginia has created a need for full-depth and partial-depth repairs. In this report, efforts related to full-depth repairs are described and discussed,...

  10. Functional and environmental assessment of the urboecosystems designed in the biologically reclamated landfill with industrial wastes (in Ryazan city)

    NASA Astrophysics Data System (ADS)

    Karyakin, Alexey; Vasenev, Ivan; Karyakina, Svetlana

    2015-04-01

    Regional environmental bodies' ability to understand, model and predict their soil cover environmental functions are especially important in case of landfill reclamation. The special attention has to be done to landfills with industrial wastes created earlier in frame of big city - comparatively closed to their residential areas. Dominated in Ryazan region sandy loam gray forest soils with not so high soil organic matter content and soil exchange capacity determine additional problems with landfill biological reclamation and continuous sustainable vegetation cover development. The modern environmental monitoring system has been developed in the big landfill with tanning industrial wastes from the biggest in Europe tannery to develop recommendation on the environmentally friendly reclamation technologies adapted to concrete landscape conditions and functional features of 2 m fresh soil-ground coating the landfill surface. More detailed monitoring system has to be developed to assess the regulatory environmental functions of the regenerated soil cover to minimize the reclamated landfill' negative impacts on the urban ecosystem air, surface and ground water quality. Obtained result will be useful for similar landfills with tanning industrial wastes environmental impact assessment and smart design.

  11. Geomorphic reclmation of a coal refuse pile

    NASA Astrophysics Data System (ADS)

    Hopkinson, L. C.; Quaranta, J.

    2017-12-01

    Geomorphic reclamation is a technique that may offer opportunities to improve mine reclamation in Central Appalachia. The design approach is based on constructing a steady-state, mature landform condition and takes into account the long-term climatic conditions, soil types, terrain grade, and vegetation. Geomorphic reclamation has been applied successfully in semi-arid regions but has not yet been applied in Central Appalachia. This work describes a demonstration study where geomorphic landforming techniques are being applied to a coarse coal refuse pile in southern West Virginia, USA. The reclamation design includes four geomorphic watersheds that radially drain runoff from the pile. Each watershed has one central draining channel and incorporates compound slope profiles similarly to naturally eroded slopes. Planar slopes were also included to maintain the impacted area. The intent is to alter the hydrology to decrease water quality treatment costs. The excavation cut and fill volumes are comparable to those of more conventional refuse pile reclamation designs. If proven successful then this technique can be part of a cost-effective solution to improve water quality at active and future refuse facilities, abandoned mine lands, bond forfeiture sites, landfills, and major earthmoving activities within the region.

  12. Trees for Reclamation Symposium Proceedings

    Treesearch

    Northeastern Forest Experiment Station

    1980-01-01

    A collection of 30 papers presented at the symposium on trees for reclamation in the Eastern United States held October 27-29, 1980, Lexington, Kentucky, and sponsored by the USDA Forest Service and Interstate Mining Compact Commission.

  13. 30 CFR 904.25 - Approval of Arkansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...; Management accounting; and Abandoned mine land problem description. September 22, 1999 January 14, 2000... management and disposition of land and water; Reclamation on private land; Rights of entry; Public...

  14. 30 CFR 884.13 - Content of proposed State reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... reclamation program, the Rural Abandoned Mine Program administered by the Soil Conservation Service, the... wildlife and their habitat. [47 FR 28600, June 30, 1982, as amended at 73 FR 67642, Nov. 14, 2008] ...

  15. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  16. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  17. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  18. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  19. 30 CFR 901.20 - Approval of Alabama abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 649 Monroe Street, Montgomery, AL 36131. (b) Office of Surface Mining Reclamation and Enforcement, Birmingham Field Office, Barber Business Park, 135 Gemini Circle, Homewood, AL 35209. [64 FR 20166, Apr. 26...

  20. Decomposition of groundwater level fluctuations using transfer modelling in an area with shallow to deep unsaturated zones

    NASA Astrophysics Data System (ADS)

    Gehrels, J. C.; van Geer, F. C.; de Vries, J. J.

    1994-05-01

    Time series analysis of the fluctuations in shallow groundwater levels in the Netherlands lowlands have revealed a large-scale decline in head during recent decades as a result of an increase in land drainage and groundwater withdrawal. The situation is more ambiguous in large groundwater bodies located in the eastern part of the country, where the unsaturated zone increases from near zero along the edges to about 40 m in the centre of the area. As depth of the unsaturated zone increases, groundwater level reacts with an increasing delay to fluctuations in climate and influences of human activities. The aim of the present paper is to model groundwater level fluctuations in these areas using a linear stochastic transfer function model, relating groundwater levels to estimated precipitation excess, and to separate artificial components from the natural groundwater regime. In this way, the impact of groundwater withdrawal and the reclamation of a 1000 km 2 polder area on the groundwater levels in the adjoining higher ground could be assessed. It became evident that the linearity assumption of the transfer functions becomes a serious drawback in areas with the deepest groundwater levels, because of non-linear processes in the deep unsaturated zone and the non-synchronous arrival of recharge in the saturated zone. Comparison of the results from modelling the influence of reclamation with an analytical solution showed that the lowering of groundwater level is partly compensated by reduced discharge and therefore is less than expected.

  1. [Impact of land use type on stability and organic carbon of soil aggregates in Jinyun Mountain].

    PubMed

    Li, Jian-Lin; Jiang, Chang-Sheng; Hao, Qing-Ju

    2014-12-01

    Soil aggregates have the important effect on soil fertility, soil quality and the sustainable utilization of soil, and they are the mass bases of water and fertilizer retention ability of soil and the supply or release of soil nutrients. In this paper, in order to study the impact of land use type on stability and organic carbon of soil aggregates in Jinyun Mountain, we separated four land use types of soil, which are woodland, abandoned land, orchard and sloping farmland by wet sieving method, then we got the proportion of large macroaggregates (> 2 mm), small macroaggregates (0.25-2 mm), microaggregates (53 μm-0.25 mm) and silt + clay (< 53 μm) and measured the content of organic carbon in each aggregate fraction in soil depth of 0-60 cm and calculated the total content of organic carbon of all aggregates fraction in each soil. The results showed that reclamation of woodland will lead to fragmentation of macroaggregates and deterioration of soil structure, and the proportion of macroaggrgates (> 0.25 mm) were 44.62% and 32.28% respectively in the soils of orchard and sloping farmland, which reduced 38.58% (P < 0.05) and 91.52% (P < 0.05) compared with woodland. While after changing the sloping farmland to abandoned land, which lead to the conversion of soil fraction from silt + clay to large macroaggregates and small macroaggregates, so it will improve the soil structure. MWD (mean weight diameter) and GMD (geometric mean diameter) are important indicators of evaluating the stability of soil aggregates. We found the MWD and GWD in soil depth of 0-60 cm in orchards and sloping farmland were significantly lower than those in woodland (P < 0.05), while after changing the sloping farmland to abandoned land, the MWD and GWD increased significantly (P < 0.05), which indicated that reclamation of woodland will lead to the decrease of stability of soil aggregates, and they will be separated more easily by water. However, after changing the sloping farmland to abandoned land will enhance the stability of soil aggregates, and improve the ability of soil to resist external damage. The organic carbon content in each soil aggregate of four land use types decreased with the increase of soil depth. In soil depth of 0-60 cm, the storage of organic carbon of large macroaggregates in each soil are in orders of woodland (14.98 Mg x hm(-2)) > abandoned land (8.71 Mg x hm(-2)) > orchard (5.82 Mg x hm(-2)) > sloping farmland (2.13 Mg x hm(-2)), and abandoned land (35.61 Mg x hm(-2)) > woodland (20.38 Mg x hm-(-2)) > orchard (13.83 Mg x hm(-2)) > sloping farmland (6.77 Mg x hm(-2)) in small macroaggregates, and abandoned land (22.44 Mg x hm(-2)) > woodland (10.20 Mg x hm(-2)) > orchard (6.80 Mg x hm(-2)) > sloping farmland (5. 60 Mg x hm(-2)) in microaggregates, and abandoned land (22.21 Mg x hm(-2)) > woodland (17.01 Mg x hm(-2)) > orchard (16.70 Mg x hm(-2)) > sloping farmland (9.85 Mg x hm(-2)) in silt and clay fraction. Storage of organic carbon in each aggregate in the soils of woodland and abandoned land were higher than those in the soils of orchard and sloping farmland, which indicated that reclamation of woodland will lead to a loss of organic carbon in each soil aggregate fraction, while after changing the sloping farmland to abandoned land will contribute to restore and sequestrate the soil organic carbon. In addition, it showed that most organic carbon accumulated in small macroaggregate in soils of woodland and abandoned land, while they are in silt and clay in soils of orchard and sloping farmland, indicating that organic carbon in larger aggregates is unstable and is easier to convert during the land use change.

  2. 10 CFR 765.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... enactment of UMTRCA to perform decontamination, decommissioning, reclamation, and other remedial action... contaminated soil, disposal of process wastes, removal actions, air pollution abatement measures, mill and... subpart C of this part. Decontamination, decommissioning, reclamation, and other remedial action means...

  3. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  4. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  5. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  6. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  7. 30 CFR 750.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON INDIAN LANDS § 750.1 Scope. This subchapter provides for the regulation of surface coal mining and reclamation operations on Indian lands and constitutes the Federal program for Indian lands. ...

  8. 30 CFR 916.25 - Approval of Kansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... approving all, or portions of these amendments, were published in the Federal Register and the State.... House Bill 3009 eliminated the Kansas Mined Land Conservation and Reclamation Board and transferred its...

  9. 30 CFR 916.25 - Approval of Kansas abandoned mine land reclamation plan amendments.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... approving all, or portions of these amendments, were published in the Federal Register and the State.... House Bill 3009 eliminated the Kansas Mined Land Conservation and Reclamation Board and transferred its...

  10. 43 CFR 429.7 - Can I use land where Reclamation holds an easement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... submit an application for the proposed use. If after review of the application, Reclamation determines... must also secure the permission of the landowner for your requested use of the area covered by...

  11. 30 CFR 756.16 - Approval of the Hopi Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 86039, Telephone: (520) 734-2441. (b) Office of Surface Mining Reclamation and Enforcement, Albuquerque Field Office, 505 Marquette Ave., NW., Suite 1200, Albuquerque, NM 87102, Telephone: (505) 248-5070. [61...

  12. 30 CFR 756.16 - Approval of the Hopi Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 86039, Telephone: (520) 734-2441. (b) Office of Surface Mining Reclamation and Enforcement, Albuquerque Field Office, 505 Marquette Ave., NW., Suite 1200, Albuquerque, NM 87102, Telephone: (505) 248-5070. [61...

  13. 30 CFR 756.16 - Approval of the Hopi Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 86039, Telephone: (520) 734-2441. (b) Office of Surface Mining Reclamation and Enforcement, Albuquerque Field Office, 505 Marquette Ave., NW., Suite 1200, Albuquerque, NM 87102, Telephone: (505) 248-5070. [61...

  14. 30 CFR 756.16 - Approval of the Hopi Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 86039, Telephone: (520) 734-2441. (b) Office of Surface Mining Reclamation and Enforcement, Albuquerque Field Office, 505 Marquette Ave., NW., Suite 1200, Albuquerque, NM 87102, Telephone: (505) 248-5070. [61...

  15. 30 CFR 756.16 - Approval of the Hopi Tribe's abandoned mine land reclamation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 86039, Telephone: (520) 734-2441. (b) Office of Surface Mining Reclamation and Enforcement, Albuquerque Field Office, 505 Marquette Ave., NW., Suite 1200, Albuquerque, NM 87102, Telephone: (505) 248-5070. [61...

  16. Integrated mined-area reclamation and land-use planning. Volume 3C. A case study of surface mining and reclamation planning: Georgia Kaolin Company Clay Mines, Washington County, Georgia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guernsey, J L; Brown, L A; Perry, A O

    1978-02-01

    This case study examines the reclamation practices of the Georgia Kaolin's American Industrial Clay Company Division, a kaolin producer centered in Twiggs, Washington, and Wilkinson Counties, Georgia. The State of Georgia accounts for more than one-fourth of the world's kaolin production and about three-fourths of U.S. kaolin output. The mining of kaolin in Georgia illustrates the effects of mining and reclaiming lands disturbed by area surface mining. The disturbed areas are reclaimed under the rules and regulations of the Georgia Surface Mining Act of 1968. The natural conditions influencing the reclamation methodologies and techniques are markedly unique from those ofmore » other mining operations. The environmental disturbances and procedures used in reclaiming the kaolin mined lands are reviewed and implications for planners are noted.« less

  17. Costs of abandoned coal mine reclamation and associated recreation benefits in Ohio.

    PubMed

    Mishra, Shruti K; Hitzhusen, Frederick J; Sohngen, Brent L; Guldmann, Jean-Michel

    2012-06-15

    Two hundred years of coal mining in Ohio have degraded land and water resources, imposing social costs on its citizens. An interdisciplinary approach employing hydrology, geographic information systems, and a recreation visitation function model, is used to estimate the damages from upstream coal mining to lakes in Ohio. The estimated recreational damages to five of the coal-mining-impacted lakes, using dissolved sulfate as coal-mining-impact indicator, amount to $21 Million per year. Post-reclamation recreational benefits from reducing sulfate concentrations by 6.5% and 15% in the five impacted lakes were estimated to range from $1.89 to $4.92 Million per year, with a net present value ranging from $14.56 Million to $37.79 Million. A benefit costs analysis (BCA) of recreational benefits and coal mine reclamation costs provides some evidence for potential Pareto improvement by investing limited resources in reclamation projects. Copyright © 2012 Elsevier Ltd. All rights reserved.

  18. Assessing coastal reclamation suitability based on a fuzzy-AHP comprehensive evaluation framework: A case study of Lianyungang, China.

    PubMed

    Feng, Lan; Zhu, Xiaodong; Sun, Xiang

    2014-12-15

    Coastal reclamation suitability evaluation (CRSE) is a difficult, complex and protracted process requiring the evaluation of many different criteria. In this paper, an integrated framework employing a fuzzy comprehensive evaluation method and analytic hierarchy process (AHP) was applied to the suitability evaluation for coastal reclamation for future sustainable development in the coastal area of Lianyungang, China. The evaluation results classified 6.63%, 22.99%, 31.59% and 38.79% of the coastline as suitable, weakly suitable, unsuitable and forbidden, respectively. The evaluation results were verified by the marine pollution data and highly consistent with the water quality status. The fuzzy-AHP comprehensive evaluation method (FACEM) was found to be suitable for the CRSE. This CRSE can also be applied to other coastal areas in China and thereby be used for the better management of coastal reclamation and coastline protection projects. Copyright © 2014 Elsevier Ltd. All rights reserved.

  19. Coupled hydrodynamic and ecological simulation for prognosticating land reclamation impacts in river estuaries

    NASA Astrophysics Data System (ADS)

    Xu, Yan; Cai, Yanpeng; Sun, Tao; Yang, Zhifeng; Hao, Yan

    2018-03-01

    A multiphase finite-element hydrodynamic model and a phytoplankton simulation approach are coupled into a general modeling framework. It can help quantify impacts of land reclamation. Compared with previous studies, it has the following improvements: a) reflection of physical currents and suitable growth areas for phytoplankton, (b) advancement of a simulation method to describe the suitability of phytoplankton in the sea water. As the results, water velocity is 16.7% higher than that of original state without human disturbances. The related filling engineering has shortened sediment settling paths, weakened the vortex flow and reduced the capacity of material exchange. Additionally, coastal reclamation lead to decrease of the growth suitability index (GSI), thus it cut down the stability of phytoplankton species approximately 4-12%. The proposed GSI can be applied to the management of coastal reclamation for minimizing ecological impacts. It will be helpful for facilitating identifying suitable phytoplankton growth areas.

  20. Evaluation of full depth asphaltic concrete pavements : interim report.

    DOT National Transportation Integrated Search

    1975-02-01

    This report provides a review of the performance and structural characteristics exhibited on two full depth asphaltic concrete pavement projects constructed on the Louisiana interstate system. : The roughness characteristics of both full depth projec...

  1. Habitat availability vs. flow rate for the Pecos River, Part 1 : Depth and velocity availability.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    James, Scott Carlton; Schaub, Edward F.; Jepsen, Richard Alan

    2004-02-01

    The waters of the Pecos River in New Mexico must be delivered to three primary users: (1) The Pecos River Compact: each year a percentage of water from natural river flow must be delivered to Texas; (2) Agriculture: Carlsbad Irrigation District has a storage and diversion right and Fort Sumner Irrigation District has a direct flow diversion right; and, (3) Endangered Species Act: an as yet unspecified amount of water is to support Pecos Bluntnose Shiner Minnow habitat within and along the Pecos River. Currently, the United States Department of Interior Bureau of Reclamation, the New Mexico Interstate Stream Commission,more » and the United States Department of the Interior Fish and Wildlife Service are studying the Pecos Bluntnose Shiner Minnow habitat preference. Preliminary work by Fish and Wildlife personnel in the critical habitat suggest that water depth and water velocity are key parameters defining minnow habitat preference. However, river flows that provide adequate preferred habitat to support this species have yet to be determined. Because there is a limited amount of water in the Pecos River and its reservoirs, it is critical to allocate water efficiently such that habitat is maintained, while honoring commitments to agriculture and to the Pecos River Compact. This study identifies the relationship between Pecos River flow rates in cubic feet per second (cfs) and water depth and water velocity.« less

  2. 75 FR 6332 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-09

    ... practices, shrub reclamation standards, fish and wildlife enhancement measures, cultural and historic... normal husbandry practices, reorganize and clarify species diversity and shrub density requirements, and... vegetation sampling methods and reclamation success standards for shrubs on reclaimed lands. In August of...

  3. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  4. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  5. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  6. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  7. 30 CFR 942.20 - Approval of Tennessee reclamation plan for lands and waters affected by past coal mining.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., 530 Gay Street, Suite 500, Knoxville, Tennessee 37902 State of Tennessee Department of Conservation, Division of Surface Mining and Reclamation, 305 West Springvale, Knoxville, Tennessee 37917 Office of...

  8. Predatory Microorganisms Would Help Reclaim Water

    NASA Technical Reports Server (NTRS)

    Benjaminson, Morris A.; Lehrer, Stanley

    1995-01-01

    Wastewater-reclamation systems of proposed type use predatory, nonpathogenic microorganisms to consume pathogenic microorganisms. Unlike some other wastewater-reclamation systems, these systems do not require use of toxic chemicals, intense heat, or ionizing radiation (conductivity rays or ultraviolet) to destroy microorganisms.

  9. "U.S. Reclamation Service, Grand River Dam, details of piers 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "U.S. Reclamation Service, Grand River Dam, details of piers 'C' & 'E,' Oct. 10, 1914." - Grand Valley Diversion Dam, Half a mile north of intersection of I-70 & Colorado State Route 65, Cameo, Mesa County, CO

  10. 76 FR 64047 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Montana regulatory program (hereinafter, the ``Montana program'') under the Surface Mining...

  11. 76 FR 36040 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Wyoming regulatory program (hereinafter, the ``Wyoming program'') under the Surface Mining...

  12. 78 FR 16204 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Wyoming regulatory program (hereinafter, the ``Wyoming program'') under the Surface Mining...

  13. 76 FR 80310 - Wyoming Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 950... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Wyoming regulatory program (hereinafter, the ``Wyoming program'') under the Surface Mining...

  14. 76 FR 67635 - Alaska Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 902... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Alaska regulatory program (hereinafter, the ``Alaska program'') under the Surface Mining...

  15. 76 FR 64045 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Montana regulatory program (hereinafter, the ``Montana program'') under the Surface Mining...

  16. 76 FR 76111 - Montana Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 926... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and... amendment to the Montana regulatory program (hereinafter, the ``Montana program'') under the Surface Mining...

  17. 43 CFR 404.1 - What is the purpose of this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.1 What is the purpose of this part? The purpose of this part is to explain how the Reclamation Rural Water Supply Program is...

  18. 77 FR 25874 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-02

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Final rule; removal of required amendment... regulatory program (the ``Pennsylvania program'') regulations under the Surface Mining Control and...

  19. PERFORMANCE DEMONSTRATIONS OF ALTERNATIVE SCREEN RECLAMATION PRODUCTS FOR SCREEN PRINTING

    EPA Science Inventory

    This project evaluated environmentally-preferable products for the screen reclamation process In screen printing during month-long demonstrations at 23 printing facilities nationwide. hrough the Environmental Protection Agency (EPA) Design for the Environment Printing Project, pr...

  20. WILLOW CREEK RECLAMATION PROJECT

    EPA Science Inventory

    Working in cooperation with the EPA, Colorado Division of Minerals and Geology, and others, the Willow Creek Reclamation Committee (WCRC) will investigate the sources and character of water entering the mine workings on the Amethyst vein near the town of Creede, Colorado. Activi...

  1. Water Reclamation and Reuse.

    ERIC Educational Resources Information Center

    Smith, Daniel W.

    1978-01-01

    Presents a literature review of water reclamation and reuse. This review covers: (1) water resources planning; (2) agriculture and irrigation; (3) ground recharge; (4) industrial reuse; (5) health considerations; and (6) technology developments. A list of 217 references is also presented. (HM)

  2. 77 FR 1430 - Maryland Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-10

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 920... Mining Reclamation and Enforcement (OSM), Interior. ACTION: Proposed rule; extension of the comment... the Maryland regulatory program (the ``Maryland program'') under the Surface Mining Control and...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilpatrick, Laura E.; Cotter, Ed

    The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features containedmore » within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)« less

  4. 30 CFR 780.38 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS SURFACE MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 780.38... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  5. 30 CFR 784.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.10... requires applicants for permits for underground coal mines to prepare and submit an operation and...

  6. 30 CFR 784.30 - Support facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS UNDERGROUND MINING PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN § 784.30... description, plans, and drawings for each support facility to be constructed, used, or maintained within the...

  7. 30 CFR 775.13 - Judicial review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS... to judicial review by a court of competent jurisdiction, as provided for in the State program, but...

  8. 30 CFR 800.21 - Collateral bonds.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS BOND AND INSURANCE REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS UNDER REGULATORY PROGRAMS § 800.21 Collateral bonds... subject to the following conditions: (1) The regulatory authority shall keep custody of collateral...

  9. 30 CFR 740.10 - Information collection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS... surface coal mining operations on Federal lands. Persons intending to conduct such operations must respond...

  10. 30 CFR 740.10 - Information collection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS... surface coal mining operations on Federal lands. Persons intending to conduct such operations must respond...

  11. 76 FR 16714 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938 [PA-160-FOR; OSM 2010-0019] Pennsylvania Regulatory Program AGENCY: Office of Surface Mining... Pennsylvania regulatory program (the ``Pennsylvania program'') under the Surface Mining Control and Reclamation...

  12. 75 FR 46877 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938 [PA-156-FOR; OSM 2010-0004] Pennsylvania Regulatory Program AGENCY: Office of Surface Mining... Pennsylvania program (the ``Pennsylvania program'') under the Surface Mining Control and Reclamation Act of...

  13. 30 CFR 701.4 - Responsibility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the... regulatory authority has responsibility for review of and decisions on permits and bonding for surface coal mining and reclamation operations, approval of coal exploration which substantially disturbs the natural...

  14. 30 CFR 824.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Scope. 824.1 Section 824.1 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT PROGRAM... part sets forth special environmental protection performance, reclamation, and design standards for...

  15. 75 FR 12562 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... DEPARTMENT OF THE INTERIOR THE UTAH RECLAMATION MITIGATION AND CONSERVATION COMMISSION Central...-- Water and Science; Utah Reclamation Mitigation and Conservation Commission; and the Central Utah Water... of Public Scoping for the proposed Provo River Delta Restoration, Utah County, Utah. SUMMARY...

  16. Bibliography of surface-mine reclamation research: 1976-1993

    Treesearch

    Jerry T. Crews

    1999-01-01

    Contains citations for 177 articles and publications that describe research on or related to reclamation of surface-mined lands conducted from 1976 through 1993 by scientists with the Northeastern Forest Experiment Station and cooperating organizations. A subject index is included.

  17. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7...

  18. Using a High-Resolution Ensemble Modeling Method to Inform Risk-Based Decision-Making at Taylor Park Dam, Colorado

    NASA Astrophysics Data System (ADS)

    Mueller, M.; Mahoney, K. M.; Holman, K. D.

    2015-12-01

    The Bureau of Reclamation (Reclamation) is responsible for the safety of Taylor Park Dam, located in central Colorado at an elevation of 9300 feet. A key aspect of dam safety is anticipating extreme precipitation, runoff and the associated inflow of water to the reservoir within a probabilistic framework for risk analyses. The Cooperative Institute for Research in Environmental Sciences (CIRES) has partnered with Reclamation to improve understanding and estimation of precipitation in the western United States, including the Taylor Park watershed. A significant challenge is that Taylor Park Dam is located in a relatively data-sparse region, surrounded by mountains exceeding 12,000 feet. To better estimate heavy precipitation events in this basin, a high-resolution modeling approach is used. The Weather Research and Forecasting (WRF) model is employed to simulate events that have produced observed peaks in streamflow at the location of interest. Importantly, an ensemble of model simulations are run on each event so that uncertainty bounds (i.e., forecast error) may be provided such that the model outputs may be more effectively used in Reclamation's risk assessment framework. Model estimates of precipitation (and the uncertainty thereof) are then used in rainfall runoff models to determine the probability of inflows to the reservoir for use in Reclamation's dam safety risk analyses.

  19. Estimation of GHG Emissions from Water Reclamation Plants in Beijing.

    PubMed

    Fan, Yupeng; Bai, Yanying; Jiao, Wentao

      A procedure for estimating Greenhouse gas (GHG) emissions from a wastewater reclamation plant in Beijing was developed based on the process chain model. GHG emissions under two typical water reclamation treatment processes, the coagulation-sedimentation-filtration traditional process and advanced biological treatment process, were examined. The total on-site GHG emissions were estimated to be 0.0056 kg/m 3 and 0.6765 kg/m 3 respectively, while total off-site GHG emissions were estimated to be 0.3699 kg/m 3 and 0.4816 kg/m 3 . The overall GHG emissions were 0.3755 kg/m 3 under the type 1 treatment, which is much lower than that under the type 2 of 1.1581 kg/m 3 . Emissions from both processes were lower than that from the tap water production. Wastewater reclamation and reuse should be promoted as it not only saves the water resources but also can reduce the GHG emissions. Energy consumption was the most significant source of GHG emissions. Biogas recovery should be employed as it can significantly reduce the GHG emissions, especially under the type 2 treatment process. Considering the wastewater treatment and reclamation process as a whole, the type 2 treatment process has advantages in reducing the GHG emissions per unit of pollutant. This paper provides scientific basis for decision making.

  20. Evaluation of sewage sludge incineration ash as a potential land reclamation material.

    PubMed

    Lin, Wenlin Yvonne; Ng, Wei Cheng; Wong, Belinda Shu Ee; Teo, Serena Lay-Ming; Sivananthan, Gayathiri D/O; Baeg, Gyeong Hun; Ok, Yong Sik; Wang, Chi-Hwa

    2018-05-23

    This study evaluated the potential of utilising sewage sludge incineration ash as a land reclamation material. Toxicity assessment of the leachate of the ash was carried out for both terrestrial and marine organisms. Both the fruit fly Drosophila melanogaster and barnacle Amphibalanus amphitrite showed that both bottom and fly ash leached at liquid-to-solid (L/S) ratio 5 did not substantially affect viabilities. The leachate carried out at L/S 10 was compared to the European Waste Acceptance Criteria and the sewage sludge ashes could be classified as non-hazardous waste. The geotechnical properties of the sewage sludge ash were studied and compared to sand, a conventional land reclamation material, for further evaluation of its potential as a land reclamation material. It was found from direct shear test that both bottom and fly ashes displayed similar and comparable shear strength to that of typical compacted sandy soil based on the range of internal friction angle obtained. However, the consolidation profile of bottom ash was significantly different from sand, while that of fly ash was more similar to sand. Our study showed that the sewage sludge ash has the potential to be used as a land reclamation material. Copyright © 2018 Elsevier B.V. All rights reserved.

  1. Jiangsu coastal highland reclamation and its wetland ecological construction-a case analysis of the Tiaozini reclamation project

    NASA Astrophysics Data System (ADS)

    Yu, Meixiu; Xu, Xianghong

    2017-04-01

    Reclamation is one potential solution for the increasing demand of new land for living and development. In past centuries, many coastal countries, such as the Netherlands, UK, Japan, South Korea and Singapore, had exploited extensively sea enclosing and reclamation fordefense against storm surges,agricultural and industrial development, as well as for coastal city expansion along the coast. China has continuously reclaimed coastal sea areas from the 1950s. With rapid economic development and increasing population in coastal areas during recent decades, reclamation has been regarded as an effective measure to resolve the land shortage as cities and industries expand, particularly in South-East coastal areas. Jiangsu province, located in East China, has a similar amount of land territory area to the Netherlands, however, its population is almost fivefold instead. Since its coastal area generates large amounts of tidal flat resources due to its unique hydrodynamic and geomorphic conditions, coastal reclamation plays a vital role in guaranteeing the food security for the Jiangsu Province or even the whole nation. The Tiaozini Reclamation Project (TRP), located between N32.720°-32.882°, E120.894°-120.969°, in Jianggang county of Jiangsu coastal region, with an area of 6,746ha, was reclaimed along the prograding muddy silt coast in 2012. It should be noted that the TRP was reclaimed from theoretical bathymetrical datum of about 4.6m. It is estimated that the shoreline moves towards the sea at a rate of 100m/year and the tidal flat raises at a rate of 5 10 cm/year respectively because of the external tidal flat being continually prograding and drying. After finishing reclamation,the TRP develops with nature: for the dried tidal flat high land,developing ecological agriculture after integrated soil improvement with reducing salt and cultivating fertilizer; for the drying tidal flat,developing ecological fishery by inceasing artificial wetland area; for lower tidal flat,developing more suitable water bird habitats by reserving natural ecological wetland and restoring affected wetland. The TRP is attempting to be built as an ecological cultivation demonstration integrated with ecological restoration, science research and education, and ecological leisure respectively. To better protecting and restoring tidal wetland, and for sustainable utilization and management of wetland resource, Jiangsu coast development group CO., Ltd (it is in charge of the TRP reclamation and development), Hohai University and Deltares signed a triple cooperation strategic framework agreement, co-building the Jiangsu Province coastal development and ecological construction engineering center. Besides, routine surveys in ecological, hydrological, topographic data in/around the TRP are also carrying out as well as the ecological compensations.

  2. 77 FR 54490 - Alabama Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... Mining Reclamation and Enforcement, Interior. ACTION: Proposed rule; public comment period and opportunity for public hearing on proposed amendment. SUMMARY: We, the Office of Surface Mining Reclamation... will follow for the public hearing, if one is requested. DATES: We will accept written comments on this...

  3. 44. Photograph of original sketch by Paul Cloyd, Historical Architect, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of original sketch by Paul Cloyd, Historical Architect, Denver Service Center, National Park Service, Denver, Colorado, dated March 1985. EVOLUTION OF GRAND CANYON WATER RECLAMATION PLANT AS IT STANDS TODAY. - Water Reclamation Plant, Grand Canyon, Coconino County, AZ

  4. 30 CFR 740.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR FEDERAL LANDS PROGRAM GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS § 740.4 Responsibilities. (a) The Secretary is responsible for: (1) Approval, disapproval or conditional approval of mining...

  5. 30 CFR 735.2 - Objectives.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... encourage the States to assume jurisdiction over the regulation of surface coal mining and reclamation... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Objectives. 735.2 Section 735.2 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PERMANENT...

  6. 30 CFR 900.4 - Responsibilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE INTRODUCTION § 900.4 Responsibilities. (a) Each State that has surface coal mining and reclamation operations or coal exploration activities on non...

  7. 30 CFR 705.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR GENERAL RESTRICTION ON FINANCIAL INTERESTS OF STATE EMPLOYEES § 705.5 Definitions. Act. Means the Surface Mining Control and Reclamation Act of 1977, Pub. L. 95-87. Coal mining operation. Means the business of...

  8. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  9. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  10. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  11. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  12. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  13. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  14. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., professional law enforcement program on Reclamation project facilities, and to protect Federal project lands... Federal laws, regulations, and policies of the Department; (d) To ensure that approved standards are... criminal and intelligence information with other Federal, State, local, and tribal agencies, as appropriate...

  15. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., professional law enforcement program on Reclamation project facilities, and to protect Federal project lands... Federal laws, regulations, and policies of the Department; (d) To ensure that approved standards are... criminal and intelligence information with other Federal, State, local, and tribal agencies, as appropriate...

  16. 75 FR 34960 - Pennsylvania Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 938 [PA-155-FOR; OSM 2010-0003] Pennsylvania Regulatory Program AGENCY: Office of Surface Mining... ``Pennsylvania program'') under the Surface Mining Control and Reclamation Act of 1977 (SMCRA or the Act...

  17. 78 FR 9807 - Utah Regulatory Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Part 944... Mining Reclamation and Enforcement, Interior. ACTION: Final rule; approval of amendment. SUMMARY: We are approving an amendment to the Utah regulatory program (the ``Utah program'') under the Surface Mining...

  18. 43 CFR 404.29 - Can the level of effort needed to complete an appraisal investigation or feasibility study be...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview... the total size, cost, and complexity of the proposed rural water supply project in order to reduce the...

  19. 43 CFR 404.53 - Does this rule provide authority for the transfer of pre-existing facilities from Federal to...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.53 Does...-existing facilities or pre-existing components of any water system from Federal to private ownership, or...

  20. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation operations; and (c) Administer cooperative agreements for State regulation of surface coal mining and...

  1. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation operations; and (c) Administer cooperative agreements for State regulation of surface coal mining and...

  2. 30 CFR 700.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands...) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation... Code of Federal Regulations. (g) Subchapter G governs applications for and decisions on permits for...

  3. 30 CFR 700.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands...) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation... Code of Federal Regulations. (g) Subchapter G governs applications for and decisions on permits for...

  4. 30 CFR 700.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands...) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation... Code of Federal Regulations. (g) Subchapter G governs applications for and decisions on permits for...

  5. 30 CFR 735.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... State programs for the regulation and control of surface coal mining and reclamation operations; (b) Administer and enforce State programs for the regulation and control of surface coal mining and reclamation operations; and (c) Administer cooperative agreements for State regulation of surface coal mining and...

  6. 30 CFR 700.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .../federal_register/code_of_federal_regulations/ibr_locations.html. Incorporation by reference provisions... pursuant to section 523 of the Act to regulate surface coal mining and reclamation operations on Federal... no approved State or Federal program and coal exploration and surface coal mining and reclamation...

  7. 30 CFR 700.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands...) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation... Code of Federal Regulations. (g) Subchapter G governs applications for and decisions on permits for...

  8. 30 CFR 700.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands...) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation... Code of Federal Regulations. (g) Subchapter G governs applications for and decisions on permits for...

  9. 43 CFR 429.26 - When may Reclamation reduce or waive costs or fees?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reductions or Waivers of Application Fees, Administrative Costs, and Use Fees § 429.26 When may Reclamation... ✓ ✓ ✓ (5) Applicant is a non-profit or educational entity and the use provides a general public benefit...

  10. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  11. 30 CFR 872.19 - Are there any restrictions on how Indian tribes may use Tribal share funds?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....12 of this chapter that is requested under section 409(c) of SMCRA; (d) Deposit into an acid mine... RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION MONEYS AVAILABLE TO...

  12. 30 CFR 872.19 - Are there any restrictions on how Indian tribes may use Tribal share funds?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....12 of this chapter that is requested under section 409(c) of SMCRA; (d) Deposit into an acid mine... RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION MONEYS AVAILABLE TO...

  13. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  14. 30 CFR 872.19 - Are there any restrictions on how Indian tribes may use Tribal share funds?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....12 of this chapter that is requested under section 409(c) of SMCRA; (d) Deposit into an acid mine... RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION MONEYS AVAILABLE TO...

  15. 30 CFR 872.19 - Are there any restrictions on how Indian tribes may use Tribal share funds?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ....12 of this chapter that is requested under section 409(c) of SMCRA; (d) Deposit into an acid mine... RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION MONEYS AVAILABLE TO...

  16. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  17. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  18. 30 CFR 876.1 - Scope.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION ACID MINE DRAINAGE TREATMENT AND ABATEMENT PROGRAM § 876.1 Scope. This part establishes the requirements and procedures for the preparation, submission and approval of State or Indian tribe Acid Mine...

  19. 30 CFR 872.19 - Are there any restrictions on how Indian tribes may use Tribal share funds?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....12 of this chapter that is requested under section 409(c) of SMCRA; (d) Deposit into an acid mine... RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND RECLAMATION MONEYS AVAILABLE TO...

  20. 30 CFR 778.15 - Right-of-entry information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS PERMIT APPLICATIONS-MINIMUM REQUIREMENTS FOR LEGAL, FINANCIAL, COMPLIANCE, AND RELATED INFORMATION... upon which the applicant bases his legal right to enter and begin surface coal mining and reclamation...

Top