Sample records for future facility upgrades

  1. NASA Glenn PSL-3 and 4 Control System Upgrade

    NASA Technical Reports Server (NTRS)

    Lizanich, Paul J.

    2010-01-01

    An overview of the PSL-3&4 Jet Engine Test Facility control system; including its history, a description of the present effort to upgrade from Emerson Ovation v2.2 to V3.3.1, and future upgrade plans is shown.

  2. Jefferson Lab Science: Present and Future

    DOE PAGES

    McKeown, Robert D.

    2015-02-12

    The Continuous Electron Beam Accelerator Facility (CEBAF) and associated experimental equipment at Jefferson Lab comprise a unique facility for experimental nuclear physics. Furthermore, this facility is presently being upgraded, which will enable a new experimental program with substantial discovery potential to address important topics in nuclear, hadronic, and electroweak physics. Further in the future, it is envisioned that the Laboratory will evolve into an electron-ion colliding beam facility.

  3. The Nova Upgrade Facility for ICF ignition and gain

    NASA Astrophysics Data System (ADS)

    Lowdermilk, W. H.; Campbell, E. M.; Hunt, J. T.; Murray, J. R.; Storm, E.; Tobin, M. T.; Trenholme, J. B.

    1992-01-01

    Research on Inertial Confinement Fusion (ICF) is motivated by its potential defense and civilian applications, including ultimately the generation of electric power. The U.S. ICF Program was reviewed recently by the National Academy of Science (NAS) and the Fusion Policy Advisory Committee (FPAC). Both committees issued final reports in 1991 which recommended that first priority in the ICF program be placed on demonstrating fusion ignition and modest gain (G less than 10). The U.S. Department of Energy and Lawrence Livermore National Laboratory (LLNL) have proposed an upgrade of the existing Nova Laser Facility at LLNL to accomplish these goals. Both the NAS and FPAC have endorsed the upgrade of Nova as the optimal path to achieving ignition and gain. Results from Nova Upgrade Experiments will be used to define requirements for driver and target technology both for future high-yield military applications, such as the Laboratory Microfusion Facility (LMF) proposed by the Department of Energy, and for high-gain energy applications leading to an ICF engineering test facility. The central role and modifications which Nova Upgrade would play in the national ICF strategy are described.

  4. Recent Upgrades at the Fermilab Test Beam Facility

    NASA Astrophysics Data System (ADS)

    Rominsky, Mandy

    2016-03-01

    The Fermilab Test Beam Facility is a world class facility for testing and characterizing particle detectors. The facility has been in operation since 2005 and has undergone significant upgrades in the last two years. A second beam line with cryogenic support has been added and the facility has adopted the MIDAS data acquisition system. The facility also recently added a cosmic telescope test stand and improved tracking capabilities. With two operational beam lines, the facility can deliver a variety of particle types and momenta ranging from 120 GeV protons in the primary beam line down to 200 MeV particles in the tertiary beam line. In addition, recent work has focused on analyzing the beam structure to provide users with information on the data they are collecting. With these improvements, the Fermilab Test Beam facility is capable of supporting High Energy physics applications as well as industry users. The upgrades will be discussed along with plans for future improvements.

  5. The Deep Space Network: An instrument for radio astronomy research

    NASA Technical Reports Server (NTRS)

    Renzetti, N. A.; Levy, G. S.; Kuiper, T. B. H.; Walken, P. R.; Chandlee, R. C.

    1988-01-01

    The NASA Deep Space Network operates and maintains the Earth-based two-way communications link for unmanned spacecraft exploring the solar system. It is NASA's policy to also make the Network's facilities available for radio astronomy observations. The Network's microwave communication systems and facilities are being continually upgraded. This revised document, first published in 1982, describes the Network's current radio astronomy capabilities and future capabilities that will be made available by the ongoing Network upgrade. The Bibliography, which includes published papers and articles resulting from radio astronomy observations conducted with Network facilities, has been updated to include papers to May 1987.

  6. National Facilities study

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This study provides a set of recommendations for improving the effectiveness of our nation's aeronautics and space facilities. The study plan considers current and future government and commercial needs as well as DOD and NASA mission requirements through the year 2023. It addresses shortfalls in existing capabilities, new facility requirements, upgrades, consolidations, and phase-out of existing facilities. If the recommendations are implemented, they will provide world-class capability where it is vital to our country's needs and make us more efficient in meeting future needs.

  7. High Speed Operation and Testing of a Fault Tolerant Magnetic Bearing

    NASA Technical Reports Server (NTRS)

    DeWitt, Kenneth; Clark, Daniel

    2004-01-01

    Research activities undertaken to upgrade the fault-tolerant facility, continue testing high-speed fault-tolerant operation, and assist in the commission of the high temperature (1000 degrees F) thrust magnetic bearing as described. The fault-tolerant magnetic bearing test facility was upgraded to operate to 40,000 RPM. The necessary upgrades included new state-of-the art position sensors with high frequency modulation and new power edge filtering of amplifier outputs. A comparison study of the new sensors and the previous system was done as well as a noise assessment of the sensor-to-controller signals. Also a comparison study of power edge filtering for amplifier-to-actuator signals was done; this information is valuable for all position sensing and motor actuation applications. After these facility upgrades were completed, the rig is believed to have capabilities for 40,000 RPM operation, though this has yet to be demonstrated. Other upgrades included verification and upgrading of safety shielding, and upgrading control algorithms. The rig will now also be used to demonstrate motoring capabilities and control algorithms are in the process of being created. Recently an extreme temperature thrust magnetic bearing was designed from the ground up. The thrust bearing was designed to fit within the existing high temperature facility. The retrofit began near the end of the summer, 04, and continues currently. Contract staff authored a NASA-TM entitled "An Overview of Magnetic Bearing Technology for Gas Turbine Engines", containing a compilation of bearing data as it pertains to operation in the regime of the gas turbine engine and a presentation of how magnetic bearings can become a viable candidate for use in future engine technology.

  8. Advances in Engine Test Capabilities at the NASA Glenn Research Center's Propulsion Systems Laboratory

    NASA Technical Reports Server (NTRS)

    Pachlhofer, Peter M.; Panek, Joseph W.; Dicki, Dennis J.; Piendl, Barry R.; Lizanich, Paul J.; Klann, Gary A.

    2006-01-01

    The Propulsion Systems Laboratory at the National Aeronautics and Space Administration (NASA) Glenn Research Center is one of the premier U.S. facilities for research on advanced aeropropulsion systems. The facility can simulate a wide range of altitude and Mach number conditions while supplying the aeropropulsion system with all the support services necessary to operate at those conditions. Test data are recorded on a combination of steady-state and highspeed data-acquisition systems. Recently a number of upgrades were made to the facility to meet demanding new requirements for the latest aeropropulsion concepts and to improve operational efficiency. Improvements were made to data-acquisition systems, facility and engine-control systems, test-condition simulation systems, video capture and display capabilities, and personnel training procedures. This paper discusses the facility s capabilities, recent upgrades, and planned future improvements.

  9. Master Planning School District Facility Needs

    ERIC Educational Resources Information Center

    Prager, Gary; Matschulat, Robert

    2010-01-01

    Most educational entities confront any number of facility issues. Upgrading the physical infrastructure to meet current and future demands can be intimidating. The quantity and magnitude of capital issues in a changing environment can be overwhelming. How can all this complexity be made coherent to assure that decisions are sound and limited…

  10. Working Group 5: Measurements technology and active experiments

    NASA Technical Reports Server (NTRS)

    Whipple, E.; Barfield, J. N.; Faelthammar, C.-G.; Feynman, J.; Quinn, J. N.; Roberts, W.; Stone, N.; Taylor, W. L.

    1986-01-01

    Technology issues identified by working groups 5 are listed. (1) New instruments are needed to upgrade the ability to measure plasma properties in space. (2) Facilities should be developed for conducting a broad range of plasma experiments in space. (3) The ability to predict plasma weather within magnetospheres should be improved and a capability to modify plasma weather developed. (4) Methods of control of plasma spacecraft and spacecraft plasma interference should be upgraded. (5) The space station laboratory facilities should be designed with attention to problems of flexibility to allow for future growth. These issues are discussed.

  11. A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

    NASA Technical Reports Server (NTRS)

    Kennedy, Barbara J.

    2004-01-01

    The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

  12. The ATLAS multi-user upgrade and potential applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mustapha, B.; Nolen, J. A.; Savard, G.

    With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existingmore » ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~ 1 MeV/u and isotope production at ~ 6 MeV/u or at the full ATLAS energy of ~ 15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be presented. Future plans to enhance the flexibility of this upgrade will also be presented.« less

  13. The ATLAS multi-user upgrade and potential applications

    NASA Astrophysics Data System (ADS)

    Mustapha, B.; Nolen, J. A.; Savard, G.; Ostroumov, P. N.

    2017-12-01

    With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existing ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~1 MeV/u, isotope production and radiobiological studies at ~6 MeV/u and at the full ATLAS energy of ~15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be discussed. Future plans to enhance the flexibility of this upgrade will be presented.

  14. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  15. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  16. 28 CFR 115.218 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies....218 Upgrades to facilities and technologies. (a) When designing or acquiring any new facility and in... surveillance system, or other monitoring technology, the agency shall consider how such technology may enhance...

  17. LLE Review Quarterly Report (April-June 1989). Volume 39

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simon, A.

    1989-06-01

    This volume of the LLE Review, covering the period April-June 1989, includes the second part of a two-part series dealing with the preliminary design of the OMEGA Upgrade. One article provides a general overview of the current upgrade system configuration and another article describes the target system. Future issues of the LLE Review will cover other aspects of the OMEGA Upgrade as the detailed system design develops. In addition, the advanced technology section of this issue contains an article discussing the interaction of a picosecond optical pulse with high temperature superconductors. Finally, the activities of the National Laser Users Facilitymore » and the GDL and OMEGA laser facilities are summarized.« less

  18. ACRF Instrumentation Status: New, Current, and Future - October – November 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JW Voyles

    2007-11-30

    The purpose of this report is to provide a concise but comprehensive overview of Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) instrumentation status. The report is divided into the following four sections: (1) new instrumentation in the process of being acquired and deployed, (2) existing instrumentation and progress on improvements or upgrades, (3) proposed future instrumentation, and (4) SBIR instrument development.

  19. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Dudley, Stephanie R. B.; Marsh, Angela L.

    2014-01-01

    With an increase in utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four-month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS real-time operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art Video Wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project. This paper describes the logistics and lessons learned in upgrading a control center capability in the middle of complex real-time operations. Combining the efficiencies of controller interaction and new technology infusion were prime drivers for this upgrade to handle the increased utilization of science research on ISS. The success of this project could not jeopardize the current operations while these facility upgrades occurred.

  20. The Sanford Underground Research Facility at Homestake (SURF)

    DOE PAGES

    Lesko, K. T.

    2015-03-24

    The former Homestake gold mine in Lead, South Dakota is being transformed into a dedicated laboratory to pursue underground research in rare-process physics, as well as offering research opportunities in other disciplines. A key component of the Sanford Underground Research Facility (SURF) is the Davis Campus, which is in operation at the 4850-foot level (4300 m.w.e) and currently hosts three projects: the LUX dark matter experiment, the Majorana Demonstrator neutrinoless double-beta decay experiment and the Berkeley and CUBED low-background counters. Plans for possible future experiments at SURF are well underway and include long baseline neutrino oscillation experiments, future dark mattermore » experiments as well as nuclear astrophysics accelerators. Facility upgrades to accommodate some of these future projects have already started. SURF is a dedicated facility with significant expansion capability. These plans include a Generation-2 Dark Matter experiment and the US flagship neutrino experiment, LBNE.« less

  1. 40 CFR 256.22 - Recommendations for State regulatory powers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste... prohibit new open dumps and close or upgrade all existing open dumps. (a) Solid waste disposal standards... solid waste disposal facility. These procedures should include identification of future land use or the...

  2. 40 CFR 256.22 - Recommendations for State regulatory powers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste... prohibit new open dumps and close or upgrade all existing open dumps. (a) Solid waste disposal standards... solid waste disposal facility. These procedures should include identification of future land use or the...

  3. Recent Developments at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2011-01-01

    Several upgrade projects have been completed or are just getting started at the NASA Langley Research Center National Transonic Facility. These projects include a new high capacity semi-span balance, model dynamics damping system, semi-span model check load stand, data acquisition system upgrade, facility automation system upgrade and a facility reliability assessment. This presentation will give a brief synopsis of each of these efforts.

  4. Utilizing Regional Centers in Sustaining Upgraded Russian Federation Ministry of Defense Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaldenbach, Karen Yvonne; Chainikov, General Vladimir; Fedorov, General Victor

    2010-01-01

    Since the mid-1990s the governments of the United States (U.S.) and the Russian Federation (RF) have been collaborating on nonproliferation projects, particularly in the protection of nuclear material through the Department of Energy's (DOE) National Nuclear Security Administration (NNSA). To date, this collaboration has resulted in upgrades to more than 72 RF Ministry of Defense (MOD) sensitive sites and facilities. These upgrades include physical protection systems (PPS), facilities to ensure material remains secure in various configurations, and infrastructure to support, maintain, and sustain upgraded sites. Significant effort on the part of both governments has also been expended to ensure thatmore » personnel obtain the necessary skills and training to both operate and maintain the security systems, thereby ensuring long term sustainability. To accomplish this, initial vendor training on physical protection systems was provided to key personnel, and an approved training curriculum was developed to teach the skills of operating, managing, administering, and maintaining the installed physical protection systems. This approach also included documentation of the processes and procedures to support infrastructure, requisite levels of maintenance and testing of systems and equipment, lifecycle management support, inventory systems and spare parts caches. One of the core components in the U.S. exit strategy and full transition to the RF MOD is the development and utilization of regional centers to facilitate centralized training and technical support to upgraded MOD sites in five regions of the RF. To date, two regional centers and one regional classroom facility are functional, and two additional regional centers are currently under construction. This paper will address the process and logistics of regional center establishment and the future vision for integrated regional center support by the RF MOD.« less

  5. The capabilities of monochromatic EC neutrino beams with the SPS upgrade

    NASA Astrophysics Data System (ADS)

    Espinoza, C.; Bernabéu, J.

    2008-05-01

    The goal for future neutrino facilities is the determination of the U(e3) mixing and CP violation in neutrino oscillations. This will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We conclude that the SPS upgrade to 1000 GeV is crucial to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline. We compare the physics potential for two different configurations: I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. The main conclusion is that, whereas the gain in the determination of U(e3) is rather modest, setup II provides much better sensitivity to CP violation.

  6. Radiation shielding design of a new tomotherapy facility.

    PubMed

    Zacarias, Albert; Balog, John; Mills, Michael

    2006-10-01

    It is expected that intensity modulated radiation therapy (IMRT) and image guided radiation therapy (IGRT) will replace a large portion of radiation therapy treatments currently performed with conventional MLC-based 3D conformal techniques. IGRT may become the standard of treatment in the future for prostate and head and neck cancer. Many established facilities may convert existing vaults to perform this treatment method using new or upgraded equipment. In the future, more facilities undoubtedly will be considering de novo designs for their treatment vaults. A reevaluation of the design principles used in conventional vault design is of benefit to those considering this approach with a new tomotherapy facility. This is made more imperative as the design of the TomoTherapy system is unique in several aspects and does not fit well into the formalism of NCRP 49 for a conventional linear accelerator.

  7. News from the ESO Science Archive Facility

    NASA Astrophysics Data System (ADS)

    Dobrzycki, A.; Arnaboldi, M.; Bierwirth, T.; Boelter, M.; Da Rocha, C.; Delmotte, N.; Forchì, V.; Fourniol, N.; klein Gebbinck, M.; Lange, U.; Mascetti, L.; Micol, A.; Moins, C.; Munte, C.; Pluciennik, C.; Retzlaff, J.; Romaniello, M.; Rosse, N.; Sequeiros, I. V.; Vuong, M.-H.; Zampieri, S.

    2015-09-01

    ESO Science Archive Facility (SAF) - one of the world's biggest astronomical archives - combines two roles: operational (ingest, tallying, safekeeping and distribution to observers of raw data taken with ESO telescopes and processed data generated both internally and externally) and scientific (publication and delivery of all flavours of data to external users). This paper presents the “State of the SAF.” SAF, as a living entity, is constantly implementing new services and upgrading the existing ones. We present recent and future developments related to the Archive's Request Handler and metadata handling as well as performance and usage statistics and trends. We also discuss the current and future datasets on offer at SAF.

  8. Historical Overview and Recent Improvements at the NASA Glenn Research Center 8x6 9x15 Wind Tunnel Complex

    NASA Technical Reports Server (NTRS)

    Dussling, Joseph John

    2015-01-01

    A brief history of the 8x6 Supersonic Wind Tunnel (SWT) and 9x15 Low Speed Wind Tunnel (LSWT) at NASA Glenn Research Center, Cleveland, Ohio is presented along with current capabilities and plans for future upgrades within the facility.

  9. Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)

    NASA Technical Reports Server (NTRS)

    Stengle, Thomas; Hoge, Susan

    2008-01-01

    The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.

  10. Facilities Upgrade and Retrofit. Strategies for Success.

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2000-01-01

    Provides three articles on the subject of educational facility upgrading and retrofiting that address setting guidelines for classroom acoustics, making sports facilities brighter and more energy-efficient, and cutting energy bills and protecting interiors. (GR)

  11. Status Report for the Hypervelocity Free-Flight Aerodynamic Facility

    NASA Technical Reports Server (NTRS)

    Cornelison, Charles J.; Arnold, James O. (Technical Monitor)

    1997-01-01

    The Hypervelocity Free-Flight Aerodynamic Facility, located at Ames Research Center, is NASA's only aeroballistic facility. During 1997, its model imaging and time history recording systems were the focus of a major refurbishment effort. Specifically the model detection, spark gap (light source); Kerr cell (high speed shuttering); and interval timer sub-systems were inspected, repaired, modified or replaced as required. These refurbishment efforts have fully restored the HFFAF's capabilities to a much better condition, comparable to what it was 15 years ago. Details of this refurbishment effort along with a brief discussion of future upgrade plans are presented.

  12. Upgrade of U.S. EPA's Experimental Stream Facility Supervisory Control and Data Acquisition System

    EPA Science Inventory

    The Supervisory control and data acquisition (SCADA) system for the U.S. EPA’s Experimental Stream Facility (ESF) was upgraded using Camile hardware and software in 2015. The upgrade added additional hardwired connections, new wireless capabilities, and included a complete rewrit...

  13. Propulsion Ground Testing: Planning for the Future

    NASA Technical Reports Server (NTRS)

    Bruce, Robert

    2003-01-01

    Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

  14. Status and Perspectives of the INFN-LNS In-Flight Fragment Separator

    NASA Astrophysics Data System (ADS)

    Russotto, P.; Calabretta, L.; Cardella, G.; Cosentino, G.; De Filippo, E.; Gnoffo, B.; La Cognata, M.; Martorana, N. S.; Pagano, E. V.; Pizzone, R. G.; Quattrocchi, L.; Romano, S.; Russo, A. D.; Santonocito, D.

    2018-05-01

    In the last 15 years the FRIBs@LNS facility has successfully produced Radioactive Ion Beams using the In-Flight technique. We report on the current status and future perspectives opened by FRAISE, a new fragment separator that will be build in connection with the upgrade of Superconducting Cyclotron of the INFN-LNS laboratories.

  15. Energy dependence of CP-violation reach for monochromatic neutrino beam

    NASA Astrophysics Data System (ADS)

    Bernabéu, José; Espinoza, Catalina

    2008-06-01

    The ultimate goal of future neutrino facilities is the determination of CP violation in neutrino oscillations. Besides | U (e 3) | ≠ 0, this will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We compare the physics potential for two different configurations: (I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; (II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. We conclude that the SPS upgrade to 1000 GeV is important to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline.

  16. 28 CFR 115.318 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  17. 28 CFR 115.318 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  18. 28 CFR 115.318 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies... facilities and technologies. (a) When designing or acquiring any new facility and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  19. Possibility for ultra-bright electron beam acceleration in dielectric wakefield accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simakov, Evgenya I.; Carlsten, Bruce E.; Shchegolkov, Dmitry Yu.

    2012-12-21

    We describe a conceptual proposal to combine the Dielectric Wakefield Accelerator (DWA) with the Emittance Exchanger (EEX) to demonstrate a high-brightness DWA with a gradient of above 100 MV/m and less than 0.1% induced energy spread in the accelerated beam. We currently evaluate the DWA concept as a performance upgrade for the future LANL signature facility MaRIE with the goal of significantly reducing the electron beam energy spread. The preconceptual design for MaRIE is underway at LANL, with the design of the electron linear accelerator being one of the main research goals. Although generally the baseline design needs to bemore » conservative and rely on existing technology, any future upgrade would immediately call for looking into the advanced accelerator concepts capable of boosting the electron beam energy up by a few GeV in a very short distance without degrading the beam's quality. Scoping studies have identified large induced energy spreads as the major cause of beam quality degradation in high-gradient advanced accelerators for free-electron lasers. We describe simulations demonstrating that trapezoidal bunch shapes can be used in a DWA to greatly reduce the induced beam energy spread, and, in doing so, also preserve the beam brightness at levels never previously achieved. This concept has the potential to advance DWA technology to a level that would make it suitable for the upgrades of the proposed Los Alamos MaRIE signature facility.« less

  20. USP <800> Adds Significant Safety Standards: Facility Upgrades Needed to Protect Employees From Hazardous Drugs.

    PubMed

    Beans, Bruce E

    2017-05-01

    The new USP standard for handling hazardous drugs (HDs) will require millions of dollars in capital outlays for facility and equipment upgrades and also requires in-depth assessments of each HD that facilities handle, significant workflow and work practice changes, and thorough staff training.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stickney, R.G.

    This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified.

  2. FEANICS: A Multi-User Facility For Conducting Solid Fuel Combustion Experiments On ISS

    NASA Technical Reports Server (NTRS)

    Frate, David T.; Tofil, Todd A.

    2001-01-01

    The Destiny Module on the International Space Station (ISS) will soon be home for the Fluids and Combustion Facility's (FCF) Combustion Integrated Rack (CIR), which is being developed at the NASA Glenn Research Center in Cleveland, Ohio. The CIR will be the platform for future microgravity combustion experiments. A multi-user mini-facility called FEANICS (Flow Enclosure Accommodating Novel Investigations in Combustion of Solids) will also be built at NASA Glenn. This mini-facility will be the primary means for conducting solid fuel combustion experiments in the CIR on ISS. The main focus of many of these solid combustion experiments will be to conduct basic and applied scientific investigations in fire-safety to support NASA's Bioastronautics Initiative. The FEANICS project team will work in conjunction with the CIR project team to develop upgradeable and reusable hardware to meet the science requirements of current and future investigators. Currently, there are six experiments that are candidates to use the FEANICS mini-facility. This paper will describe the capabilities of this mini-facility and the type of solid combustion testing and diagnostics that can be performed.

  3. Summary of Current and Future MSFC International Space Station Environmental Control and Life Support System Activities

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia

    1997-01-01

    This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.

  4. Re-Engineering the ISS Payload Operations Control Center During Increased Utilization and Critical Onboard Events

    NASA Technical Reports Server (NTRS)

    Marsh, Angela L.; Dudley, Stephanie R. B.

    2014-01-01

    With an increase in the utilization and hours of payload operations being executed onboard the International Space Station (ISS), upgrading the NASA Marshall Space Flight Center (MSFC) Huntsville Operations Support Center (HOSC) ISS Payload Control Area (PCA) was essential to gaining efficiencies and assurance of current and future payload health and science return. PCA houses the Payload Operations Integration Center (POIC) responsible for the execution of all NASA payloads onboard the ISS. POIC Flight Controllers are responsible for the operation of voice, stowage, command, telemetry, video, power, thermal, and environmental control in support of ISS science experiments. The methodologies and execution of the PCA refurbishment were planned and performed within a four month period in order to assure uninterrupted operation of ISS payloads and minimal impacts to payload operations teams. To vacate the PCA, three additional HOSC control rooms were reconfigured to handle ISS realtime operations, Backup Control Center (BCC) to Mission Control in Houston, simulations, and testing functions. This involved coordination and cooperation from teams of ISS operations controllers, multiple engineering and design disciplines, management, and construction companies performing an array of activities simultaneously and in sync delivering a final product with no issues that impacted the schedule. For each console operator discipline, studies of Information Technology (IT) tools and equipment layouts, ergonomics, and lines of sight were performed. Infusing some of the latest IT into the project was an essential goal in ensuring future growth and success of the ISS payload science returns. Engineering evaluations led to a state of the art media wall implementation and more efficient ethernet cabling distribution providing the latest products and the best solution for the POIC. These engineering innovations led to cost savings for the project. Constraints involved in the management of the project included executing over 450 crew-hours of ISS real-time payload operations including a major onboard communications upgrade, SpaceX un-berth, a Soyuz launch, roll-out of ISS live video and interviews from the POIC, annual BCC certification and hurricane season, and ISS simulations and testing. Continuous ISS payload operations were possible during the PCA facility modifications with the reconfiguration of four control rooms and standup of two temporary control areas. Another major restriction to the project was an ongoing facility upgrade that included a NASA Headquarters mandated replacement of all electrical and mechanical systems and replacement of an external generator. These upgrades required a facility power outage during the PCA upgrades. The project also encompassed console layout designs and ordering, amenities selections and ordering, excessing of old equipment, moves, disposal of old IT equipment, camera installations, facility tour re-schedules, and contract justifications. These were just some of the tasks needed for a successful project.

  5. Review of Aeronautical Wind Tunnel Facilities

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The nation's aeronautical wind tunnel facilities constitute a valuable technological resource and make a significant contribution to the global supremacy of U.S. aircraft, both civil and military. At the request of NASA, the National Research Council's Aeronautics and Space Engineering Board organized a commitee to review the state of repair, adequacy, and future needs of major aeronautical wind tunnel facilities in meeting national goals. The comittee identified three main areas where actions are needed to sustain the capability of NASA's aeronautical wind tunnel facilities to support the national aeronautical research and development activities: tunnel maintenance and upgrading, productivity enhancement, and accommodation of new requirements (particularly in hypersonics). Each of these areas are addressed and the committee recommendations for appropriate actions presented.

  6. Recovery Act. Tapoco project. Cheoah upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tran, Paul

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  7. Propulsion Ground Testing: Planning for the Future

    NASA Technical Reports Server (NTRS)

    Bruce, Robert

    2003-01-01

    Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre- existing test capabilities. The key words in the previous sentence are "substantial investment". In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based upon both life cycle cost decisions in an environment in which the more immediate challenge of "front-end" capital investment? Often times is the linch-pin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.

  8. Materials Science Experiments Under Microgravity - A Review of History, Facilities, and Future Opportunities

    NASA Technical Reports Server (NTRS)

    Stenzel, Ch.

    2012-01-01

    Materials science experiments have been a key issue already since the early days of research under microgravity conditions. A microgravity environment facilitates processing of metallic and semiconductor melts without buoyancy driven convection and sedimentation. Hence, crystal growth of semiconductors, solidification of metallic alloys, and the measurement of thermo-physical parameters are the major applications in the field of materials science making use of these dedicated conditions in space. In the last three decades a large number of successful experiments have been performed, mainly in international collaborations. In parallel, the development of high-performance research facilities and the technological upgrade of diagnostic and stimuli elements have also contributed to providing optimum conditions to perform such experiments. A review of the history of materials science experiments in space focussing on the development of research facilities is given. Furthermore, current opportunities to perform such experiments onboard ISS are described and potential future options are outlined.

  9. Evaluation of radiological dispersion/consequence codes supporting DOE nuclear facility SARs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O`Kula, K.R.; Paik, I.K.; Chung, D.Y.

    1996-12-31

    Since the early 1990s, the authorization basis documentation of many U.S. Department of Energy (DOE) nuclear facilities has been upgraded to comply with DOE orders and standards. In this process, many safety analyses have been revised. Unfortunately, there has been nonuniform application of software, and the most appropriate computer and engineering methodologies often are not applied. A DOE Accident Phenomenology and Consequence (APAC) Methodology Evaluation Program was originated at the request of DOE Defense Programs to evaluate the safety analysis methodologies used in nuclear facility authorization basis documentation and to define future cost-effective support and development initiatives. Six areas, includingmore » source term development (fire, spills, and explosion analysis), in-facility transport, and dispersion/ consequence analysis (chemical and radiological) are contained in the APAC program. The evaluation process, codes considered, key results, and recommendations for future model and software development of the Radiological Dispersion/Consequence Working Group are summarized in this paper.« less

  10. The ISOLDE facility

    NASA Astrophysics Data System (ADS)

    Catherall, R.; Andreazza, W.; Breitenfeldt, M.; Dorsival, A.; Focker, G. J.; Gharsa, T. P.; J, Giles T.; Grenard, J.-L.; Locci, F.; Martins, P.; Marzari, S.; Schipper, J.; Shornikov, A.; Stora, T.

    2017-09-01

    The ISOLDE facility has undergone numerous changes over the last 17 years driven by both the physics and technical community with a common goal to improve on beam variety, beam quality and safety. Improvements have been made in civil engineering and operational equipment while continuing developments aim to ensure operations following a potential increase in primary beam intensity and energy. This paper outlines the principal technical changes incurred at ISOLDE by building on a similar publication of the facility upgrades by Kugler (2000 Hyperfine Interact. 129 23-42). It also provides an insight into future perspectives through a brief summary issues addressed in the HIE-ISOLDE design study Catherall et al (2013 Nucl. Instrum. Methods Phys. Res. B 317 204-207).

  11. DIII-D Upgrade to Prepare the Basis for Steady-State Burning Plasmas

    NASA Astrophysics Data System (ADS)

    Buttery, R. J.; Guo, H. Y.; Taylor, T. S.; Wade, M. R.; Hill, D. N.

    2014-10-01

    Future steady-state burning plasma facilities will access new physics regimes and modes of plasma behavior. It is vital to prepare for this both experimentally using existing facilities, and theoretically in order to develop the tools to project to and optimize these devices. An upgrade to DIII-D is proposed to address the three critical aspects where research must go beyond what we can do now: (i) torque free electron heating to address the energy, particle and momentum transport mechanisms of burning plasmas using electron cyclotron (EC) heating and full power balanced neutral beams; (ii) off-axis heating and current drive to develop the path to true fusion steady state by reorienting neutral beams and deploying EC and helicon current drive; (iii) a new divertor with hot walls and reactor relevant materials to develop the basis for benign detached divertor operation compatible with wall materials and a high performance fusion core. These elements with modest incremental cost and enacted as a user facility for the whole US program will enable the US to lead on ITER and take a decision to proceed with a Fusion Nuclear Science Facility. Work supported by the US Department of Energy under DE-FC02-04ER54698 and DE-AC52-07NA27344.

  12. Crab cavities: Past, present, and future of a challenging device

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Q.

    2015-05-03

    In two-ring facilities operating with a crossing-angle collision scheme, luminosity can be limited due to an incomplete overlapping of the colliding bunches. Crab cavities then are introduced to restore head-on collisions by providing the destined opposite deflection to the head and tail of the bunch. An increase in luminosity was demonstrated at KEKB with global crab-crossing, while the Large Hardron Collider (LHC) at CERN currently is designing local crab crossing for the Hi-Lumi upgrade. Future colliders may investigate both approaches. In this paper, we review the challenges in the technology, and the implementation of crab cavities, while discussing experience inmore » earlier colliders, ongoing R&D, and proposed implementations for future facilities, such as HiLumi-LHC, CERN’s compact linear collider (CLIC), the international linear collider (ILC), and the electron-ion collider under design at BNL (eRHIC).« less

  13. Experiment Needs and Facilities Study Appendix A Transient Reactor Test Facility (TREAT) Upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The TREAT Upgrade effort is designed to provide significant new capabilities to satisfy experiment requirements associated with key LMFBR Safety Issues. The upgrade consists of reactor-core modifications to supply the physics performance needed for the new experiments, an Advanced TREAT loop with size and thermal-hydraulics capabilities needed for the experiments, associated interface equipment for loop operations and handling, and facility modifications necessary to accommodate operations with the Loop. The costs and schedules of the tasks to be accomplished under the TREAT Upgrade project are summarized. Cost, including contingency, is about 10 million dollars (1976 dollars). A schedule for execution ofmore » 36 months has been established to provide the new capabilities in order to provide timely support of the LMFBR national effort. A key requirement for the facility modifications is that the reactor availability will not be interrupted for more than 12 weeks during the upgrade. The Advanced TREAT loop is the prototype for the STF small-bundle package loop. Modified TREAT fuel elements contain segments of graphite-matrix fuel with graded uranium loadings similar to those of STF. In addition, the TREAT upgrade provides for use of STF-like stainless steel-UO{sub 2} TREAT fuel for tests of fully enriched fuel bundles. This report will introduce the Upgrade study by presenting a brief description of the scope, performance capability, safety considerations, cost schedule, and development requirements. This work is followed by a "Design Description". Because greatly upgraded loop performance is central to the upgrade, a description is given of Advanced TREAT loop requirements prior to description of the loop concept. Performance requirements of the upgraded reactor system are given. An extensive discussion of the reactor physics calculations performed for the Upgrade concept study is provided. Adequate physics performance is essential for performance of experiments with the Advanced TREAT loop, and the stress placed on these calculations reflects this. Additional material on performance and safety is provided. Backup calculations on calculations of plutonium-release limits are described. Cost and schedule information for the Upgrade are presented.« less

  14. Aerospace Energy Systems Laboratory - Requirements and design approach

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.

    1988-01-01

    The NASA Ames/Dryden Flight Research Facility operates a mixed fleet of research aircraft employing NiCd batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has evolved over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.

  15. The Zadko Telescope: Exploring the Transient Universe

    NASA Astrophysics Data System (ADS)

    Coward, D. M.; Gendre, B.; Tanga, P.; Turpin, D.; Zadko, J.; Dodson, R.; Devogéle, M.; Howell, E. J.; Kennewell, J. A.; Boër, M.; Klotz, A.; Dornic, D.; Moore, J. A.; Heary, A.

    2017-01-01

    The Zadko telescope is a 1 m f/4 Cassegrain telescope, situated in the state of Western Australia about 80-km north of Perth. The facility plays a niche role in Australian astronomy, as it is the only meter class facility in Australia dedicated to automated follow-up imaging of alerts or triggers received from different external instruments/detectors spanning the entire electromagnetic spectrum. Furthermore, the location of the facility at a longitude not covered by other meter class facilities provides an important resource for time critical projects. This paper reviews the status of the Zadko facility and science projects since it began robotic operations in March 2010. We report on major upgrades to the infrastructure and equipment (2012-2014) that has resulted in significantly improved robotic operations. Second, we review the core science projects, which include automated rapid follow-up of gamma ray burst (GRB) optical afterglows, imaging of neutrino counterpart candidates from the ANTARES neutrino observatory, photometry of rare (Barbarian) asteroids, supernovae searches in nearby galaxies. Finally, we discuss participation in newly commencing international projects, including the optical follow-up of gravitational wave (GW) candidates from the United States and European GW observatory network and present first tests for very low latency follow-up of fast radio bursts. In the context of these projects, we outline plans for a future upgrade that will optimise the facility for alert triggered imaging from the radio, optical, high-energy, neutrino, and GW bands.

  16. The GlueX Experiment: First Results

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fanelli, Cristiano

    GlueX is a nuclear physics experiment located at the Thomas Jefferson National Accelerator Facility designed to study and understand the nature of confinement in QCD by mapping the spectrum of exotic mesons. The experiment will be able to probe new areas by using photoproduction, i.e. the scattering on nucleon of ~9 GeV linearly polarized photons derived from the recently upgraded CEBAF with a 12 GeV electron beam. Spring 2016 has been characterized by a continued detector commissioning and initial running at the full design energy. The current status of the GlueX detector performance and data collection will be discussed, withmore » a brief overview of first physics results, future run plans, and long term upgrades.« less

  17. Future HEP Accelerators: The US Perspective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhat, Pushpalatha; Shiltsev, Vladimir

    2015-11-02

    Accelerator technology has advanced tremendously since the introduction of accelerators in the 1930s, and particle accelerators have become indispensable instruments in high energy physics (HEP) research to probe Nature at smaller and smaller distances. At present, accelerator facilities can be classified into Energy Frontier colliders that enable direct discoveries and studies of high mass scale particles and Intensity Frontier accelerators for exploration of extremely rare processes, usually at relatively low energies. The near term strategies of the global energy frontier particle physics community are centered on fully exploiting the physics potential of the Large Hadron Collider (LHC) at CERN throughmore » its high-luminosity upgrade (HL-LHC), while the intensity frontier HEP research is focused on studies of neutrinos at the MW-scale beam power accelerator facilities, such as Fermilab Main Injector with the planned PIP-II SRF linac project. A number of next generation accelerator facilities have been proposed and are currently under consideration for the medium- and long-term future programs of accelerator-based HEP research. In this paper, we briefly review the post-LHC energy frontier options, both for lepton and hadron colliders in various regions of the world, as well as possible future intensity frontier accelerator facilities.« less

  18. Upgrades at the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2012-01-01

    Several projects have been completed or are nearing completion at the NASA Langley Research Center (LaRC) National Transonic Facility (NTF). The addition of a Model Flow-Control/Propulsion Simulation test capability to the NTF provides a unique, transonic, high-Reynolds number test capability that is well suited for research in propulsion airframe integration studies, circulation control high-lift concepts, powered lift, and cruise separation flow control. A 1992 vintage Facility Automation System (FAS) that performs the control functions for tunnel pressure, temperature, Mach number, model position, safety interlock and supervisory controls was replaced using current, commercially available components. This FAS upgrade also involved a design study for the replacement of the facility Mach measurement system and the development of a software-based simulation model of NTF processes and control systems. The FAS upgrades were validated by a post upgrade verification wind tunnel test. The data acquisition system (DAS) upgrade project involves the design, purchase, build, integration, installation and verification of a new DAS by replacing several early 1990's vintage computer systems with state of the art hardware/software. This paper provides an update on the progress made in these efforts. See reference 1.

  19. The Science and Experimental Equipment for the 12 GeV Upgrade of CEBAF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arrington, John; Bernstein, Aron; Brooks, William

    2005-01-10

    This Conceptual Design Report (CDR) presents the compelling scientific case for upgrading the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab to 12 GeV. Such a facility will make profound contributions to the study of hadronic matter.

  20. APS deposition facility upgrades and future plans

    NASA Astrophysics Data System (ADS)

    Conley, Ray; Shi, Bing; Erdmann, Mark; Izzo, Scott; Assoufid, Lahsen; Goetze, Kurt; Mooney, Tim; Lauer, Kenneth

    2014-09-01

    The Advanced Photon Source (APS) has recently invested resources to upgrade or replace aging deposition systems with modern equipment. Of the three existing deposition systems, one will receive an upgrade, while two are being replaced. A design which adds a three-substrate planetary for the APS rotary deposition system is almost complete. The replacement for the APS large deposition system, dubbed the "Modular Deposition System", has been conceptually designed and is in the procurement process. Eight cathodes will sputter horizontally on mirrors up to 1.5 meters in length. This new instrument is designed to interface with ion-milling instruments and various metrology equipment for ion-beam figuring. A third linear machine, called the APS Profile Coating System, has two cathodes and is designed to accept substrates up to 200mm in length. While this machine is primarily intended for fabrication of figured KB mirrors using the profile-coating technique, it has also been used to produce multilayer monochromators for beamline use.

  1. 28 CFR 115.118 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  2. 28 CFR 115.118 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  3. 28 CFR 115.118 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Upgrades to facilities and technologies... and technologies. (a) When designing or acquiring any new lockup and in planning any substantial... monitoring technology, the agency shall consider how such technology may enhance the agency's ability to...

  4. The AGHS at JET and preparations for a future DT campaign

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, R.; JET-EFDA, Culham Science Centre, Abingdon

    2015-03-15

    The Active Gas Handling System (AGHS) at JET is a unique facility enabling JET to perform reactor like, DT operations. As a future DT experimental campaign (DTE2) is scheduled for 2017 this paper provides a brief overview of the AGHS and a summary of ongoing work supporting the currently JET experimental campaign. In order to improve tritium accountancy a solid state based detector for tritium is being developed. Another important upgrade concerns tritium injection, 4 existing GIMs (Tritium Gas Introduction Module) will inject a mix of D and T rather than T{sub 2} in the divertor region rather than inmore » the torus mid plane enabling a far better control and variability of the introduction of tritium into the plasma. An overview of the scale of DTE2 is included as well as an example of some of the upgrades currently being undertaken to fully exploit the learning opportunities for ITER and DEMO DTE2 provides. (authors)« less

  5. PIP-II Transfer Line Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vivoli, A.

    The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the capabilities of the Fermilab existing accelerator complex while simultaneously providing a flexible platform for its future upgrades. The central part of PIP-II project is the construction of a new 800 MeV H- Superconducting (SC) Linac together with upgrades of the Booster and Main Injector synchrotrons. New transfer lines will also be needed to deliver beam to the down-stream accelerators and facilities. In this paper we present themore » recent development of the design of the transfer lines discussing the principles that guided their design, the constraints and requirements imposed by the existing accelerator complex and the following modifications implemented to comply with a better understanding of the limitations and further requirements that emerged during the development of the project.« less

  6. Aerospace energy systems laboratory: Requirements and design approach

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.

    1988-01-01

    The NASA Ames-Dryden Flight Research Facility at Edwards, California, operates a mixed fleet of research aircraft employing nickel-cadmium (NiCd) batteries in a variety of flight-critical applications. Dryden's Battery Systems Laboratory (BSL), a computerized facility for battery maintenance servicing, has developed over two decades into one of the most advanced facilities of its kind in the world. Recently a major BSL upgrade was initiated with the goal of modernization to provide flexibility in meeting the needs of future advanced projects. The new facility will be called the Aerospace Energy Systems Laboratory (AESL) and will employ distributed processing linked to a centralized data base. AESL will be both a multistation servicing facility and a research laboratory for the advancement of energy storage system maintenance techniques. This paper describes the baseline requirements for the AESL and the design approach being taken for its mechanization.

  7. The Network Operations Control Center upgrade task: Lessons learned

    NASA Technical Reports Server (NTRS)

    Sherif, J. S.; Tran, T.-L.; Lee, S.

    1994-01-01

    This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

  8. University of Wisconsin Ion Beam Laboratory: A facility for irradiated materials and ion beam analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Field, K. G.; Wetteland, C. J.; Cao, G.

    2013-04-19

    The University of Wisconsin Ion Beam Laboratory (UW-IBL) has recently undergone significant infrastructure upgrades to facilitate graduate level research in irradiated materials phenomena and ion beam analysis. A National Electrostatics Corp. (NEC) Torodial Volume Ion Source (TORVIS), the keystone upgrade for the facility, can produce currents of hydrogen ions and helium ions up to {approx}200 {mu}A and {approx}5 {mu}A, respectively. Recent upgrades also include RBS analysis packages, end station developments for irradiation of relevant material systems, and the development of an in-house touch screen based graphical user interface for ion beam monitoring. Key research facilitated by these upgrades includes irradiationmore » of nuclear fuels, studies of interfacial phenomena under irradiation, and clustering dynamics of irradiated oxide dispersion strengthened steels. The UW-IBL has also partnered with the Advanced Test Reactor National Scientific User Facility (ATR-NSUF) to provide access to the irradiation facilities housed at the UW-IBL as well as access to post irradiation facilities housed at the UW Characterization Laboratory for Irradiated Materials (CLIM) and other ATR-NSUF partner facilities. Partnering allows for rapid turnaround from proposed research to finalized results through the ATR-NSUF rapid turnaround proposal system. An overview of the UW-IBL including CLIM and relevant research is summarized.« less

  9. ORATOS: ESA's future flight dynamics operations system

    NASA Astrophysics Data System (ADS)

    Dreger, Frank; Fertig, Juergen; Muench, Rolf

    The Orbit and Attitude Operations System (ORATOS -- the European Space Agency's future orbit and attitude operations system -- will be in use from the mid-nineties until well beyond the year 2000. The ORATOS design is based on the experience from flight dynamics support to all past ESA missions. The ORATOS computer hardware consists of a network of powerful UNIX workstations. ORATOS resides on several hardware platforms, each comprising one or more fileservers, several client workstations and the associated communications interface hardware. The ORATOS software is structured into three layers. The flight dynamics applications layer, the support layer and the operating system layer. This architectural design separates the flight dynamics application software from the support tools and operating system facilities. It allows upgrading and replacement of operating system facilities with a minimum (or no) effect on the application layer.

  10. Subscale Flight Testing for Aircraft Loss of Control: Accomplishments and Future Directions

    NASA Technical Reports Server (NTRS)

    Cox, David E.; Cunningham, Kevin; Jordan, Thomas L.

    2012-01-01

    Subscale flight-testing provides a means to validate both dynamic models and mitigation technologies in the high-risk flight conditions associated with aircraft loss of control. The Airborne Subscale Transport Aircraft Research (AirSTAR) facility was designed to be a flexible and efficient research facility to address this type of flight-testing. Over the last several years (2009-2011) it has been used to perform 58 research flights with an unmanned, remotely-piloted, dynamically-scaled airplane. This paper will present an overview of the facility and its architecture and summarize the experimental data collected. All flights to date have been conducted within visual range of a safety observer. Current plans for the facility include expanding the test volume to altitudes and distances well beyond visual range. The architecture and instrumentation changes associated with this upgrade will also be presented.

  11. Barriers to enrolment into a professional upgrading programme for enrolled nurses in Kenya

    PubMed Central

    Lakati, Alice; Ngatia, Peter; Mbindyo, Caroline; Mukami, Diana; Oywer, Elizabeth

    2012-01-01

    Introduction Nurses play a key role in the provision of health care. Over 70% of the nurses in Kenya are Enrolled Community Health Nurses (ECHNs). AMREF in partnership with Nursing Council of Kenya and the Ministry of Health pioneered an eLearning Nurse Upgrading Programme. The purpose of this study was to identify barriers that hindered enrolment into the programme. Methods A descriptive cross-sectional design was used. A sample of 532 ECHNs was interviewed from four provinces. Data was collected using a pre-tested self administered questionnaire. Analysis was done using SPSS computer software. Descriptive statistics were calculated for all variables and chi-square tests used to determine variables that were associated with enrolment. Mann Whitney U-test was used for continuous variables. Results A third (29.7%) of the nurses were from Rift Valley province and 17.9% from Coast. Majority (75%) were from public health facilities. The mean age of the nurses was 40.6 years. The average monthly income was KES 22,497.68 (USD 294). Awareness of the upgrading programme was high (97%) among the nurses. The cost of fees was the main (74.1%) barrier to enrolment in all the provinces and across all the health facilities. The type of health facility was significantly (p < 0.05) associated with enrolment. Nurses from faith-based health facilities were less likely to have enrolled. Conclusion Awareness of the upgrading programme is high. The cost of upgrading programme, age and working in a faith-based health facility are the main barriers to enrolment. Intervention that fund nurses to upgrade would increase nurse enrolment. PMID:23467717

  12. Cryogenic test facility instrumentation with fiber optic and fiber optic sensors for testing superconducting accelerator magnets

    NASA Astrophysics Data System (ADS)

    Chiuchiolo, A.; Bajas, H.; Bajko, M.; Castaldo, B.; Consales, M.; Cusano, A.; Giordano, M.; Giloux, C.; Perez, J. C.; Sansone, L.; Viret, P.

    2017-12-01

    The magnets for the next steps in accelerator physics, such as the High Luminosity upgrade of the LHC (HL- LHC) and the Future Circular Collider (FCC), require the development of new technologies for manufacturing and monitoring. To meet the HL-LHC new requirements, a large upgrade of the CERN SM18 cryogenic test facilities is ongoing with the implementation of new cryostats and cryogenic instrumentation. The paper deals with the advances in the development and the calibration of fiber optic sensors in the range 300 - 4 K using a dedicated closed-cycle refrigerator system composed of a pulse tube and a cryogen-free cryostat. The calibrated fiber optic sensors (FOS) have been installed in three vertical cryostats used for testing superconducting magnets down to 1.9 K or 4.2 K and in the variable temperature test bench (100 - 4.2 K). Some examples of FOS measurements of cryostat temperature evolution are presented as well as measurements of strain performed on a subscale of High Temperature Superconducting magnet during its powering tests.

  13. Emerging Futures for Sao Tome & Principe’s International Airport Campus

    DTIC Science & Technology

    2007-12-03

    appointment to manage daily operations of the airport. Upon his appointment in 2006, he realized the airport needed to be upgraded to meet International...International Airpon air-traffic control tower. ’rhis facility contains all of the opetational and ptimary management functions of the airport, Funding for any...views ofSTP citizens of the true value ofoil and its potential for positive effects. The addition of more people working on oil rigs, managing the

  14. The experience of the FERMI@Elettra photon beam transport and diagnostics system (PADReS) during three years of continuous support of machine and user experiments: achievements, lessons learned, and future upgrades

    NASA Astrophysics Data System (ADS)

    Zangrando, Marco; Fava, Claudio; Gerusina, Simone; Gobessi, Riccardo; Mahne, Nicola; Mazzucco, Eric; Raimondi, Lorenzo; Rumiz, Luca; Svetina, Cristian

    2014-09-01

    The FERMI FEL facility has begun delivering photons in 2011, becoming in late 2012 the first seeded facility open to external users worldwide. Since then, several tens of experiments have been carried out on the three operative endstations LDM, DiProI, and EIS-TIMEX. Starting from the commissioning phase, the transport and diagnostics system (PADReS) has been continuously developed and upgraded, becoming the indispensable interface between the machine and the experimental chambers. Moreover, PADReS itself has served as an active player for several machine studies as well as for various state-of-the-art experiments. In particular, some elements of PADReS have become key features to perform cutting edge experiments: the online energy spectrometer, the active optics refocusing systems, the split and delay line, and so on. For each of them the peculiar advantages will be described showing the actual implementation in the experiments. The experience gathered so far in fulfilling the needs of both machine and experimental physicists will be discussed, with particular emphasis on the solutions adopted in different scenarios. Recurrent requests and major difficulties will be reported so to give a glimpse about the standard tasks to be solved when preparing new and demanding experiments. Finally, some ideas and near-future improvements will be presented and discussed.

  15. The Feasibility of Establishing Operational Water Hyacinth-Based Systems at the Treatment Facilities of Existing Cities. [in Florida and Texas

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The wastewater treatment facilities of three communities in southern Florida and two in southern Texas areas having populations of 20,000 or fewer persons were surveyed to determine: (1) their performance characteristics and the nature of their customers; (2) facility upgrading requirements needed to meet current and future EPA and State standards; (3) their adaptability to water hyacinth utilization and harvested plant disposal; and (4) the level of community support. Guidelines for site selection were established and applied to five cities in Texas and four in Florida. An evaluation of the prospective sites reveals that the Florida locations are generally unsuitable for implementation of water hyacinth based systems because of regulatory philosophy. All five Texas sites have excellent potential.

  16. Technical Report from Grant Recipient - City of Redlands

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giorgianni, Kathleen Margaret

    2016-05-26

    The goals and objectives of the HVAC upgrades are to replace equipment as old as twenty-three (23) years in five different facilities. The project will upgrade some facilities from SEER ratings of 9 to SEER ratings of 14 at a savings of 556 kilowatt hours per ton (savings depends on specific size of the system).

  17. Fourth User Workshop on High-Power Lasers at the Linac Coherent Light Source

    DOE PAGES

    Bolme, Cindy Anne; Mackinnon, Andy; Glenzer, Siegfried

    2017-05-30

    The fourth international user workshop focusing on high-power lasers at the Linac Coherent Light Source (LCLS) was held in Menlo Park, CA, USA, on October 3–4, 2016. The workshop was co-organized by Los Alamos National Laboratory and SLAC National Accelerator Laboratory (SLAC), and garnered the attendance of more than 110 scientists. Participants discussed the warm dense matter and high-pressure science that is being conducted using high-power lasers at the LCLS Matter in Extreme Conditions (MEC) endstation. During the past year, there have been seven journal articles published from research at the MEC instrument. Here, the specific topics discussed at thismore » workshop were experimental highlights from the past year, current status and future commissioning of MEC capabilities, and future facility upgrades that will enable the expanded science reach of the facility.« less

  18. Fourth User Workshop on High-Power Lasers at the Linac Coherent Light Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolme, Cindy Anne; Mackinnon, Andy; Glenzer, Siegfried

    The fourth international user workshop focusing on high-power lasers at the Linac Coherent Light Source (LCLS) was held in Menlo Park, CA, USA, on October 3–4, 2016. The workshop was co-organized by Los Alamos National Laboratory and SLAC National Accelerator Laboratory (SLAC), and garnered the attendance of more than 110 scientists. Participants discussed the warm dense matter and high-pressure science that is being conducted using high-power lasers at the LCLS Matter in Extreme Conditions (MEC) endstation. During the past year, there have been seven journal articles published from research at the MEC instrument. Here, the specific topics discussed at thismore » workshop were experimental highlights from the past year, current status and future commissioning of MEC capabilities, and future facility upgrades that will enable the expanded science reach of the facility.« less

  19. Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities

    NASA Astrophysics Data System (ADS)

    Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.

    2017-12-01

    SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.

  20. RICH Detector for Jefferson Labs CLAS12

    NASA Astrophysics Data System (ADS)

    Trotta, Richard; Torisky, Ben; Benmokhtar, Fatiha

    2015-10-01

    Jefferson Lab (Jlab) is performing a large-scale upgrade to its Continuous Electron Beam Accelerator Facility (CEBAF) up to 12GeV beams. The Large Acceptance Spectrometer (CLAS12) in Hall B is being upgraded and a new hybrid Ring Imaging Cherenkov (RICH) detector is being developed to provide better kaon - pion separation throughout the 3 to 8 GeV/c momentum range. This detector will be used for a variety of Semi-Inclusive Deep Inelastic Scattering experiments. Cherenkov light can be accurately detected by a large array of sophisticated Multi-Anode Photomultiplier Tubes (MA-PMT) and heavier particles, like kaons, will span the inner radii. We are presenting our work on the creation of the RICH's geometry within the CLAS12 java framework. This development is crucial for future calibration, reconstructions and analysis of the detector.

  1. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  2. Pegasus power system facility upgrades

    NASA Astrophysics Data System (ADS)

    Lewicki, B. T.; Kujak-Ford, B. A.; Winz, G. R.

    2008-11-01

    Two key Pegasus systems have been recently upgraded: the Ohmic-transformer IGCT bridge control system, and the plasma-gun injector power system. The Ohmic control system contains two new microprocessor controlled components to provide an interface between the PWM controller and the IGCT bridges. An interface board conditions the command signals from the PWM controller. A splitter/combiner board routes the conditioned PWM commands to an array of IGCT bridges and interprets IGCT bridge status. This system allows for any PWM controller to safely control IGCT bridges. Future developments will include a transition to a polyphasic bridge control. This will allow for 3 to 4 times the present pulse length and provide a much higher switching frequency. The plasma gun injector system now includes active current feedback control on gun bias current via PWM buck type power supplies. Near term goals include a doubling or tripling of the applied bias voltage. Future arc bias system power supplies may include a simpler boost type system which will allow access to even higher voltages using existing low voltage energy storage systems.

  3. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  4. Energy Efficiency in Water and Wastewater Facilities

    EPA Pesticide Factsheets

    Learn how local governments have achieved sustained energy improvements at their water and wastewater facilities through equipment upgrades, operational modifications, and modifications to facility buildings.

  5. Research of energy characteristics of power amplifier containing KNFS Nd:phosphate glass slabs and MIRO Silver foil reflectors at the “Luch” facility

    NASA Astrophysics Data System (ADS)

    Belov, I. A.; Bel'kov, S. A.; Voronich, I. N.; Garanin, S. G.; Derkach, V. N.; Koshechkin, S. V.; Lysov, M. I.; Markov, S. S.; Savkin, S. V.

    2016-09-01

    The amplifier elements upgrade at the “Luch” laser facility was carried out. Measurements showed that the upgrade of the amplifier elements resulted in the amplifier's small signal gain coefficient K0 increase from 12.9% to 14.3% depending on the capacitor charging voltage; the linear gain coefficient increase was about g0 ≈ (6-8)%. Full-scale laser experiments at the facility showed the power amplifier gain coefficient increase consistent with active medium gain coefficient measurement results.

  6. Thermal Vacuum Control Systems Options for Test Facilities

    NASA Technical Reports Server (NTRS)

    Marchetti, John

    2008-01-01

    This presentation suggests several Thermal Vacuum System (TVAC) control design approach methods for TVAC facilities. Over the past several years many aerospace companies have or are currently upgrading their TVAC testing facilities whether it be by upgrading old equipment or purchasing new. In doing so they are updating vacuum pumping and thermal capabilities of their chambers as well as their control systems. Although control systems are sometimes are considered second to the vacuum or thermal system upgrade process, they should not be taken lightly and must be planned and implemented with the equipment it is to control. Also, emphasis should be placed on how the operators will use the system as well as the requirements of "their" customers. Presented will be various successful methods of TVAC control systems from Programmable Logic Controller (PLC) based to personal computer (PC) based control.

  7. Upgrades at the Duke Free Electron Laser Laboratory

    NASA Astrophysics Data System (ADS)

    Howell, Calvin R.

    2004-11-01

    Major upgrades to the storage-ring based photon sources at the Duke Free Electron Laser Laboratory (DFELL) are underway. The photon sources at the DFELL are well suited for research in the areas of medicine, biophysics, accelerator physics, nuclear physics and material science. These upgrades, which will be completed by the summer 2006, will significantly enhance the capabilities of the ultraviolet (UV) free-electron laser (FEL) and the high intensity gamma-ray source (HIGS). The HIGS is a relatively new research facility at the DFELL that is operated jointly by the DFELL and the Triangle Universities Nuclear Laboratory. The gamma-ray beam is produced by Compton back scattering of the UV photons inside the FEL optical cavity off the circulating electrons in the storage ring. The gamma-ray beam is 100% polarized and its energy resolution is selected by collimation. The capabilities of the upgraded facility will be described, the status of the upgrades will be summarized, and the proposed first-generation research program at HIGS will be presented.

  8. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    NASA Technical Reports Server (NTRS)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  9. Performance of the upgraded Orroral laser ranging system

    NASA Technical Reports Server (NTRS)

    Luck, John M.

    1993-01-01

    The topics discussed include the following: upgrade arrangements, system prior to 1991, elements of the upgrade, laser performance, timing system performance, pass productivity, system precision, system accuracy, telescope pointing and future upgrades and extensions.

  10. A New High Channel-Count, High Scan-Rate, Data Acquisition System for the NASA Langley Transonic Dynamics Tunnel

    NASA Technical Reports Server (NTRS)

    Ivanco, Thomas G.; Sekula, Martin K.; Piatak, David J.; Simmons, Scott A.; Babel, Walter C.; Collins, Jesse G.; Ramey, James M.; Heald, Dean M.

    2016-01-01

    A data acquisition system upgrade project, known as AB-DAS, is underway at the NASA Langley Transonic Dynamics Tunnel. AB-DAS will soon serve as the primary data system and will substantially increase the scan-rate capabilities and analog channel count while maintaining other unique aeroelastic and dynamic test capabilities required of the facility. AB-DAS is configurable, adaptable, and enables buffet and aeroacoustic tests by synchronously scanning all analog channels and recording the high scan-rate time history values for each data quantity. AB-DAS is currently available for use as a stand-alone data system with limited capabilities while development continues. This paper describes AB-DAS, the design methodology, and the current features and capabilities. It also outlines the future work and projected capabilities following completion of the data system upgrade project.

  11. Tri-axial square Helmholtz coil system at the Alibag Magnetic Observatory: upgraded to a magnetic sensor calibration facility

    NASA Astrophysics Data System (ADS)

    Mahavarkar, Prasanna; John, Jacob; Dhapre, Vijay; Dongre, Varun; Labde, Sachin

    2018-04-01

    A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia), was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG) in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.

  12. Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Ernst, E. W.; Sass, J. P.; Lobemeyer, D. A.; Sojourner, S. J.; Hatfield, W. H.; Rewinkel, D. A.

    2007-01-01

    The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility

  13. Langley Aerothermodynamic Facilities Complex: Enhancements and Testing Capabilities

    NASA Technical Reports Server (NTRS)

    Micol, J. R.

    1998-01-01

    Description, capabilities, recent upgrades, and utilization of the NASA Langley Research Center (LaRC) Aerothermodynamic Facilities Complex (AFC) are presented. The AFC consists of five hypersonic, blow-down-to-vacuum wind tunnels that collectively provide a range of Mach number from 6 to 20, unit Reynolds number from 0.04 to 22 million per foot and, most importantly for blunt configurations, normal shock density ratio from 4 to 12. These wide ranges of hypersonic simulation parameters are due, in part, to the use of three different test gases (air, helium, and tetrafluoromethane), thereby making several of the facilities unique. The Complex represents nearly three-fourths of the conventional (as opposed to impulse)-type hypersonic wind tunnels operational in this country. AFC facilities are used to assess and optimize the hypersonic aerodynamic performance and aeroheating characteristics of aerospace vehicle concepts and to provide benchmark aerodynamic/aeroheating data fr generating the flight aerodynamic databook and final design of the thermal protection system (TPS) (e.g., establishment of flight limitations not to exceed TPS design limits). Modifications and enhancements of AFC hardware components and instrumentation have been pursued to increase capability, reliability, and productivity in support of programmatic goals. Examples illustrating facility utilization in recent years to generate essentially all of the experimental hypersonic aerodynamic and aeroheating information for high-priority, fast-paced Agency programs are presented. These programs include Phase I of the Reusable Launch Vehicle (RLV) Advanced Technology Demonstrator, X-33 program, PHase II of the X-33 program, X-34 program, the Hyper-X program ( a Mach 5,7, and 10 airbreathing propulsion flight experiment), and the X-38 program (Experimental Crew Return Vehicle, X-CRV). Current upgrades/enchancements and future plans for the AFC are discussed.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goodman, Dan

    The goal of this project is to upgrade existing building facilities owned by Nunamiut Corporation in Anaktuvuk Pass, AK. The upgrades mentioned will include lighting, heating system, insulation and smart control units designed to increase the energy efficiency of Village Corporation owned buildings.

  15. Charge breeding of radioactive isotopes at the CARIBU facility with an electron beam ion source

    NASA Astrophysics Data System (ADS)

    Vondrasek, R. C.; Dickerson, C. A.; Hendricks, M.; Ostroumov, P.; Pardo, R.; Savard, G.; Scott, R.; Zinkann, G.

    2018-05-01

    An Electron Beam Ion Source Charge Breeder (EBIS-CB) has been developed at Argonne National Laboratory as part of the californium rare ion breeder upgrade. For the past year, the EBIS-CB has been undergoing commissioning as part of the ATLAS accelerator complex. It has delivered both stable and radioactive beams with A/Q < 6, breeding times <30 ms, low background contamination, and charge breeding efficiencies >18% into a single charge state. The operation of this device, challenges during the commissioning phase, and future improvements will be discussed.

  16. The Status of the ACRF Millimeter Wave Cloud Radars (MMCRs), the Path Forward for Future MMCR Upgrades, the Concept of 3D Volume Imaging Radar and the UAV Radar

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P Kollias; MA Miller; KB Widener

    2005-12-30

    The United States (U.S.) Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility (ACRF) operates millimeter wavelength cloud radars (MMCRs) in several climatological regimes. The MMCRs, are the primary observing tool for quantifying the properties of nearly all radiatively important clouds over the ACRF sites. The first MMCR was installed at the ACRF Southern Great Plains (SGP) site nine years ago and its original design can be traced to the early 90s. Since then, several MMCRs have been deployed at the ACRF sites, while no significant hardware upgrades have been performed. Recently, a two-stage upgrade (first C-40 Digitalmore » Signal Processors [DSP]-based, and later the PC-Integrated Radar AcQuisition System [PIRAQ-III] digital receiver) of the MMCR signal-processing units was completed. Our future MMCR related goals are: 1) to have a cloud radar system that continues to have high reliability and uptime and 2) to suggest potential improvements that will address increased sensitivity needs, superior sampling and low cost maintenance of the MMCRs. The Traveling Wave Tube (TWT) technology, the frequency (35-GHz), the radio frequency (RF) layout, antenna, the calibration and radar control procedure and the environmental enclosure of the MMCR remain assets for our ability to detect the profile of hydrometeors at all heights in the troposphere at the ACRF sites.« less

  17. Fuel Flexible Gas Turbine Combustor Flametube Facility Upgraded

    NASA Technical Reports Server (NTRS)

    Little, James E.; Nemets, Steve A.; Tornabene, Robert T.; Smith, Timothy D.; Frankenfeld, Bruce J.

    2004-01-01

    In fiscal year 2003, test cell 23 of the Research Combustion Laboratory (RCL 23) at the NASA Glenn Research Center was upgraded with the addition of gaseous hydrogen as a working propellant and the addition of a 450-psig air-supply system. Test flexibility was further enhanced by upgrades to the facility control systems. RCL 23 can now test with gaseous hydrogen flow rates up to 0.05 lbm/sec and jet fuel flow rates up to 0.62 lbm/sec. Research airflow rates up to 3 lbm/sec are possible with the 450-psig supply system over a range of inlet temperatures. Nonvitiated, heated air is supplied from a shell and tube heat exchanger. The maximum nonvitiated facility air temperature is 1100 F at 1.5 lbm/sec. Research-section exhaust temperatures are limited to 3200 F because of material and cooling capacity limits. A variety of support systems are available depending on the research hardware configuration. Test section ignition can be provided via either a hydrogen air torch system or an electronic spark system. Emissions measurements are obtained with either pneumatically or electromechanically actuated gas sample probes, and the electromechanical system allows for radial measurements at a user-specified axial location for measurement of emissions profiles. Gas analysis data can be obtained for a variety of species, including carbon monoxide (CO), carbon dioxide (CO2), nitrogen oxides (NO and NOx), oxygen (O2), unburnt hydrocarbons, and unburnt hydrogen. Facility control is accomplished with a programmable logic control system. Facility operations have been upgraded to a system based on graphical user interface control screens. A data system is available for real-time acquisition and monitoring of both measurements in engineering units and performance calculations. The upgrades have made RCL 23 a highly flexible facility for research into low emissions gas turbine combustor concepts, and the flame tube configuration inherently allows for a variety of fuel nozzle configurations to be tested in a cost-effective manner. RCL 23 is poised to be a leading facility for developing modern low-emission fuel nozzles for use with jet fuel and alternative fuels.

  18. 9. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: PLANS, SECTIONS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: PLANS, SECTIONS, AND DETAILS, JANUARY 1993. - Cape Canaveral Air Station, Launch Complex 17, Facility 28425, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  19. 8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photocopy of engineering drawing. SECURITY UPGRADES, SLC17: ELEVATIONS AND BUILDING SECTION, JULY 1992. - Cape Canaveral Air Station, Launch Complex 17, Facility 28425, East end of Lighthouse Road, Cape Canaveral, Brevard County, FL

  20. Thin and thick targets for radioactive ion beam production at SPIRAL1 facility

    NASA Astrophysics Data System (ADS)

    Jardin, P.; Bajeat, O.; Delahaye, P.; Dubois, M.; Kuchi, V.; Maunoury, L.

    2018-05-01

    The upgrade of the Système de Production d'Ions Radioactifs Accélérés en Ligne (SPIRAL1) facility will deliver its new Radioactive Ion Beams (RIB) by summer 2017. The goal of the upgrade is an improvement of the performances of the installation in terms of isotopes species and ion charge states [1]. Ion beams are produced using the Isotope Separator On Line Method, consisting in an association of a primary beam of stable ions, a hot target and an ion source. The primary beam impinges on the material of the target. Radioactive isotopes are produced by nuclear reactions and propagate up to the source, where they are ionized and accelerated to create a RIB. One advantage of SPIRAL1 driver is the variety of its available primary beams, from carbon to uranium with energies up to 95 MeV/A. Within the SPIRAL1 upgrade, they will be combined with targets made of a large choice of materials, extending in this way the number of possible nuclear reactions (fusion-evaporation, transfer, fragmentation) for producing a wider range of isotopes, up to regions of the nuclide chart still scarcely explored. Depending on the reaction process, on the collision energy and on the primary beam power, thin and thick targets are used. As their functions can be different, their design must cope with specific constraints which will be described. After a presentation of the goals of present and future SPIRAL1 Target Ion Source System, the main target features, studies and designs under progress are presented.

  1. Upgrade of the cryogenic CERN RF test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pirotte, O.; Benda, V.; Brunner, O.

    2014-01-29

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RFmore » test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.« less

  2. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC&A Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy

    2009-10-07

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under theirmore » control. This regulatory development has been accomplished as part of the U.S.-Russian MPC&A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC&A regulations.« less

  3. Developing the Muon Facilities at ISIS

    NASA Astrophysics Data System (ADS)

    Hillier, A. D.; Aramini, M.; Baker, P. J.; Berlie, A.; Biswas, P. K.; Cottrell, S. P.; Ishida, K.; Loe, T.; Lord, J. S.; Pooley, D. E.; Pratt, F. L.; Rhodes, N. J.; da Silva Afonso, R. J.; Telling, M. T. F.; Yokoyama, K.

    For the last 30 years, muon experiments at ISIS have been making a significant contribution to a number of scientific fields. However, as a community of researchers, we are always aiming to improve and extend the instruments' capabilities. In this paper, we will review key developments at the ISIS muon facility, the primary beamline upgrade and recent technique developments, before taking a forward look to new projects, such as: the upgrade for MuSR, e-learning, detector development and sample environment.

  4. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...

  5. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  6. 33 CFR 154.1016 - Facility classification by COTP.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Facility classification by COTP... Facilities § 154.1016 Facility classification by COTP. (a) The COTP may upgrade the classification of: (1) An...) The COTP may downgrade, the classification of: (1) An MTR facility specified in § 154.1015(c) to a...

  7. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  8. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  9. 28 CFR 115.18 - Upgrades to facilities and technologies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 115.18 Section 115.18 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) PRISON RAPE ELIMINATION ACT NATIONAL STANDARDS Standards for Adult Prisons and Jails Prevention Planning § 115.18 Upgrades... abuse. (b) When installing or updating a video monitoring system, electronic surveillance system, or...

  10. Astrophysics experiments with radioactive beams at ATLAS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Back, B. B.; Clark, J. A.; Pardo, R. C.

    Reactions involving short-lived nuclei play an important role in nuclear astrophysics, especially in explosive scenarios which occur in novae, supernovae or X-ray bursts. This article describes the nuclear astrophysics program with radioactive ion beams at the ATLAS accelerator at Argonne National Laboratory. The CARIBU facility as well as recent improvements for the in-flight technique are discussed. New detectors which are important for studies of the rapid proton or the rapid neutron-capture processes are described. At the end we briefly mention plans for future upgrades to enhance the intensity, purity and the range of in-flight and CARIBU beams.

  11. β-DECAY Studies at Triumf and Future Opportunities with Griffin

    NASA Astrophysics Data System (ADS)

    Garnsworthy, A. B.; Ball, G. C.; Bender, P. C.; Churchman, R.; Close, A.; Glister, J.; Hackman, G.; Ketelhut, S.; Krücken, R.; Sjue, S. K. L.; Tardiff, E.; Garrett, P. E.; Demand, G. A.; Dunlop, R.; Finlay, P.; Hadinia, B.; Leach, K.; Michetti-Wilson, J.; Rand, E. T.; Svensson, C. E.; Andreoiu, C.; Ashley, R.; Chester, A.; Cross, D.; Starosta, K.; Wang, Z.; Zganjar, E. F.

    2013-03-01

    The 8π spectrometer at TRIUMF-ISAC-I and a powerful suite of ancillary detectors support a wide program of research in the fields of nuclear structure, nuclear astrophysics and fundamental symmetries with low-energy radioactive beams.Work is underway to upgrade the Ge detectors and DAQ aspects of the facility to a new state-of-the-art γ-ray spectrometer, GRIFFIN, which will become operational in 2014. GRIFFIN will constitute an increase in the γ-γ efficiency of close to a factor of 300 over the current setup and extend the capabilities for investigations of exotic nuclei produced at ISAC.

  12. Upgrading and Refining of Crude Oils and Petroleum Products by Ionizing Irradiation.

    PubMed

    Zaikin, Yuriy A; Zaikina, Raissa F

    2016-06-01

    A general trend in the oil industry is a decrease in the proven reserves of light crude oils so that any increase in future oil exploration is associated with high-viscous sulfuric oils and bitumen. Although the world reserves of heavy oil are much greater than those of sweet light oils, their exploration at present is less than 12 % of the total oil recovery. One of the main constraints is very high expenses for the existing technologies of heavy oil recovery, upgrading, transportation, and refining. Heavy oil processing by conventional methods is difficult and requires high power inputs and capital investments. Effective and economic processing of high viscous oil and oil residues needs not only improvements of the existing methods, such as thermal, catalytic and hydro-cracking, but the development of new technological approaches for upgrading and refining of any type of problem oil feedstock. One of the perspective approaches to this problem is the application of ionizing irradiation for high-viscous oil processing. Radiation methods for upgrading and refining high-viscous crude oils and petroleum products in a wide temperature range, oil desulfurization, radiation technology for refining used oil products, and a perspective method for gasoline radiation isomerization are discussed in this paper. The advantages of radiation technology are simple configuration of radiation facilities, low capital and operational costs, processing at lowered temperatures and nearly atmospheric pressure without the use of any catalysts, high production rates, relatively low energy consumption, and flexibility to the type of oil feedstock.

  13. ENERGY EFFICIENCY UPGRADES FOR SANITATION FACILITIES IN SELAWIK, AK FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    POLLIS, REBECCA

    2014-10-17

    The Native Village of Selawik is a federally recognized Alaskan tribe, located at the mouth of the Selawik River, about 90 miles east of Kotzebue in northwest Alaska. Due to the community’s rural location and cold climate, it is common for electric rates to be four times higher than the cost urban residents pay. These high energy costs were the driving factor for Selawik pursuing funding from the Department of Energy in order to achieve significant energy cost savings. The main objective of the project was to improve the overall energy efficiency of the water treatment/distribution and sewer collection systemsmore » in Selawik by implementing the retrofit measures identified in a previously conducted utility energy audit. One purpose for the proposed improvements was to enable the community to realize significant savings associated with the cost of energy. Another purpose of the upgrades was to repair the vacuum sewer system on the west side of Selawik to prevent future freeze-up problems during winter months.« less

  14. Shear compression testing of glass-fibre steel specimens after 4K reactor irradiation: Present status and facility upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gerstenberg, H.; Kraehling, E.; Katheder, H.

    1997-06-01

    The shear strengths of various fibre reinforced resins being promising candidate insulators for superconducting coils to be used tinder a strong radiation load, e.g. in future fusion reactors were investigated prior and subsequent to reactor in-core irradiation at liquid helium temperature. A large number of sandwich-like (steel-bonded insulation-steel) specimens representing a widespread variety of materials and preparation techniques was exposed to irradiation doses of up to 5 x 10{sup 7} Gy in form of fast neutrons and {gamma}-radiation. In a systematic study several experimental parameters including irradiation dose, postirradiation storage temperature and measuring temperature were varied before the determination ofmore » the ultimate shear strength. The results obtained from the different tested materials are compared. In addition an upgrade of the in-situ test rig installed at the Munich research reactor is presented, which allows combined shear/compression loading of low temperature irradiated specimens and provides a doubling of the testing rate.« less

  15. Jaffrey, N.H. Facility to Upgrade its Wastewater Treatment Systems Under Clean Water Act Settlement

    EPA Pesticide Factsheets

    Under the terms of a Consent Decree lodged in federal court, EMD Millipore Corp. of Jaffrey, N.H., will upgrade its on-site wastewater treatment system to comply with the terms of the company’s industrial wastewater discharge permit & prevent...

  16. Research and Development of Wires and Cables for High-Field Accelerator Magnets

    DOE PAGES

    Barzi, Emanuela; Zlobin, Alexander V.

    2016-02-18

    The latest strategic plans for High Energy Physics endorse steadfast superconducting magnet technology R&D for future Energy Frontier Facilities. This includes 10 to 16 T Nb3Sn accelerator magnets for the luminosity upgrades of the Large Hadron Collider and eventually for a future 100 TeV scale proton-protonmore » $(pp)$ collider. This paper describes the multi-decade R&D investment in the $$Nb_3Sn$$ superconductor technology, which was crucial to produce the first reproducible 10 to 12 T accelerator-quality dipoles and quadrupoles, as well as their scale-up. We also indicate prospective research areas in superconducting $$Nb_3Sn$$ wires and cables to achieve the next goals for superconducting accelerator magnets. Emphasis is on increasing performance and decreasing costs while pushing the $$Nb_3Sn$$ technology to its limits for future $pp$ colliders.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Syphers, M. J.; Chattopadhyay, S.

    An overview is provided of the currently envisaged landscape of charged particle accelerators at the energy and intensity frontiers to explore particle physics beyond the standard model via 1-100 TeV-scale lepton and hadron colliders and multi-Megawatt proton accelerators for short- and long- baseline neutrino experiments. The particle beam physics, associated technological challenges and progress to date for these accelerator facilities (LHC, HL-LHC, future 100 TeV p-p colliders, Tev-scale linear and circular electron-positron colliders, high intensity proton accelerator complex PIP-II for DUNE and future upgrade to PIP-III) are outlined. Potential and prospects for advanced “nonlinear dynamic techniques” at the multi-MW levelmore » intensity frontier and advanced “plasma- wakefield-based techniques” at the TeV-scale energy frontier and are also described.« less

  18. 40 CFR 256.24 - Recommendations for closing or upgrading open dumps.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.24 Recommendations for closing or upgrading open dumps. (a) All... feasibility of resource recovery or resource conservation to reduce the solid waste volume entering a facility...

  19. 40 CFR 256.24 - Recommendations for closing or upgrading open dumps.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.24 Recommendations for closing or upgrading open dumps. (a) All... feasibility of resource recovery or resource conservation to reduce the solid waste volume entering a facility...

  20. Cost effective nuclear commercial grade dedication

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maletz, J.J.; Marston, M.J.

    1991-01-01

    This paper describes a new computerized database method to create/edit/view specification technical data sheets (mini-specifications) for procurement of spare parts for nuclear facility maintenance and to develop information that could support possible future facility life extension efforts. This method may reduce cost when compared with current manual methods. The use of standardized technical data sheets (mini-specifications) for items of the same category improves efficiency. This method can be used for a variety of tasks, including: Nuclear safety-related procurement; Non-safety related procurement; Commercial grade item procurement/dedication; Evaluation of replacement items. This program will assist the nuclear facility in upgrading its procurementmore » activities consistent with the recent NUMARC Procurement Initiative. Proper utilization of the program will assist the user in assuring that the procured items are correct for the applications, provide data to assist in detecting fraudulent materials, minimize human error in withdrawing database information, improve data retrievability, improve traceability, and reduce long-term procurement costs.« less

  1. The partnership: Space shuttle, space science, and space station

    NASA Technical Reports Server (NTRS)

    Culbertson, Philip E.; Freitag, Robert F.

    1989-01-01

    An overview of the NASA Space Station Program functions, design, and planned implementation is presented. The discussed functions for the permanently manned space facility include: (1) development of new technologies and related commercial products; (2) observations of the Earth and the universe; (3) provision of service facilities for resupply, maintenance, upgrade and repair of payloads and spacecraft; (4) provision of a transportation node for stationing, processing and dispatching payloads and vehicles; (5) provision of manufacturing and assembly facilities; (6) provision of a storage depot for parts and payloads; and (7) provision of a staging base for future space endeavors. The fundamental concept for the Space Station, as given, is that it be designed, operated, and evolved in response to a broad variety of scientific, technological, and commercial user interests. The Space Shuttle's role as the principal transportation system for the construction and maintenance of the Space Station and the servicing and support of the station crew is also discussed.

  2. Building 21st Century Schools: Designing Smarter, Sleeker High-Tech Facilities.

    ERIC Educational Resources Information Center

    Cutshall, Sandy

    2003-01-01

    The demand for high-tech programs in tandem with traditional classes challenges school districts to provide flexible facilities for career and technical education. Some districts partner with local businesses to develop state-of-the art facilities and deal with costs, upkeep, and upgrading. Some high-tech educational facilities are themselves…

  3. Standardization of chemical analytical techniques for pyrolysis bio-oil: history, challenges, and current status of methods

    DOE PAGES

    Ferrell, Jack R.; Olarte, Mariefel V.; Christensen, Earl D.; ...

    2016-07-05

    Here, we discuss the standardization of analytical techniques for pyrolysis bio-oils, including the current status of methods, and our opinions on future directions. First, the history of past standardization efforts is summarized, and both successful and unsuccessful validation of analytical techniques highlighted. The majority of analytical standardization studies to-date has tested only physical characterization techniques. In this paper, we present results from an international round robin on the validation of chemical characterization techniques for bio-oils. Techniques tested included acid number, carbonyl titrations using two different methods (one at room temperature and one at 80 °C), 31P NMR for determination ofmore » hydroxyl groups, and a quantitative gas chromatography–mass spectrometry (GC-MS) method. Both carbonyl titration and acid number methods have yielded acceptable inter-laboratory variabilities. 31P NMR produced acceptable results for aliphatic and phenolic hydroxyl groups, but not for carboxylic hydroxyl groups. As shown in previous round robins, GC-MS results were more variable. Reliable chemical characterization of bio-oils will enable upgrading research and allow for detailed comparisons of bio-oils produced at different facilities. Reliable analytics are also needed to enable an emerging bioenergy industry, as processing facilities often have different analytical needs and capabilities than research facilities. We feel that correlations in reliable characterizations of bio-oils will help strike a balance between research and industry, and will ultimately help to -determine metrics for bio-oil quality. Lastly, the standardization of additional analytical methods is needed, particularly for upgraded bio-oils.« less

  4. Standardization of chemical analytical techniques for pyrolysis bio-oil: history, challenges, and current status of methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferrell, Jack R.; Olarte, Mariefel V.; Christensen, Earl D.

    Here, we discuss the standardization of analytical techniques for pyrolysis bio-oils, including the current status of methods, and our opinions on future directions. First, the history of past standardization efforts is summarized, and both successful and unsuccessful validation of analytical techniques highlighted. The majority of analytical standardization studies to-date has tested only physical characterization techniques. In this paper, we present results from an international round robin on the validation of chemical characterization techniques for bio-oils. Techniques tested included acid number, carbonyl titrations using two different methods (one at room temperature and one at 80 °C), 31P NMR for determination ofmore » hydroxyl groups, and a quantitative gas chromatography–mass spectrometry (GC-MS) method. Both carbonyl titration and acid number methods have yielded acceptable inter-laboratory variabilities. 31P NMR produced acceptable results for aliphatic and phenolic hydroxyl groups, but not for carboxylic hydroxyl groups. As shown in previous round robins, GC-MS results were more variable. Reliable chemical characterization of bio-oils will enable upgrading research and allow for detailed comparisons of bio-oils produced at different facilities. Reliable analytics are also needed to enable an emerging bioenergy industry, as processing facilities often have different analytical needs and capabilities than research facilities. We feel that correlations in reliable characterizations of bio-oils will help strike a balance between research and industry, and will ultimately help to -determine metrics for bio-oil quality. Lastly, the standardization of additional analytical methods is needed, particularly for upgraded bio-oils.« less

  5. Jefferson Lab 12 GEV Cebaf Upgrade

    NASA Astrophysics Data System (ADS)

    Rode, C. H.

    2010-04-01

    The existing continuous electron beam accelerator facility (CEBAF) at Thomas Jefferson National Accelerator Facility (TJNAF) is a 5-pass, recirculating cw electron Linac operating at ˜6 GeV and is devoted to basic research in nuclear physics. The 12 GeV CEBAF Upgrade is a 310 M project, sponsored by the Department of Energy (DOE) Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. The project received construction approval in September 2008 and has started the major procurement process. The cryogenic aspects of the 12 GeV CEBAF Upgrade includes: doubling the accelerating voltages of the Linacs by adding ten new high-performance, superconducting radiofrequency (SRF) cryomodules (CMs) to the existing 42 1/4 cryomodules; doubling of the 2 K cryogenics plant; and the addition of eight superconducting magnets.

  6. High Accuracy Ground-based near-Earth-asteroid Astrometry using Synthetic Tracking

    NASA Astrophysics Data System (ADS)

    Zhai, Chengxing; Shao, Michael; Saini, Navtej; Sandhu, Jagmit; Werne, Thomas; Choi, Philip; Ely, Todd A.; Jacobs, Chirstopher S.; Lazio, Joseph; Martin-Mur, Tomas J.; Owen, William M.; Preston, Robert; Turyshev, Slava; Michell, Adam; Nazli, Kutay; Cui, Isaac; Monchama, Rachel

    2018-01-01

    Accurate astrometry is crucial for determining the orbits of near-Earth-asteroids (NEAs). Further, the future of deep space high data rate communications is likely to be optical communications, such as the Deep Space Optical Communications package that is part of the baseline payload for the planned Psyche Discovery mission to the Psyche asteroid. We have recently upgraded our instrument on the Pomona College 1 m telescope, at JPL's Table Mountain Facility, for conducting synthetic tracking by taking many short exposure images. These images can be then combined in post-processing to track both asteroid and reference stars to yield accurate astrometry. Utilizing the precision of the current and future Gaia data releases, the JPL-Pomona College effort is now demonstrating precision astrometry on NEAs, which is likely to be of considerable value for cataloging NEAs. Further, treating NEAs as proxies of future spacecraft that carry optical communication lasers, our results serve as a measure of the astrometric accuracy that could be achieved for future plane-of-sky optical navigation.

  7. High Accuracy Ground-based near-Earth-asteroid Astrometry using Synthetic Tracking

    NASA Astrophysics Data System (ADS)

    Zhai, C.; Shao, M.; Saini, N. S.; Sandhu, J. S.; Werne, T. A.; Choi, P.; Ely, T. A.; Jacobs, C.; Lazio, J.; Martin-Mur, T. J.; Owen, W. K.; Preston, R. A.; Turyshev, S. G.

    2017-12-01

    Accurate astrometry is crucial for determining the orbits of near-Earth-asteroids (NEAs). Further, the future of deep space high data rate communications is likely to be optical communications, such as the Deep Space Optical Communications package to be carried on the Psyche Discovery mission to the Psyche asteroid. We have recently upgraded our instrument on the Pomona College 1 m telescope, at JPL's Table Mountain Facility, for conducting synthetic tracking by taking many short exposure images. These images can be then combined in post-processing to track both asteroid and reference stars to yield accurate astrometry. Utilizing the precision of the current and future Gaia data releases, the JPL-Pomona College effort is now demonstrating precision astrometry on NEAs, which is likely to be of considerable value for cataloging NEAs. Further, treating NEAs as proxies of future spacecraft that carry optical communication lasers, our results serve as a measure of the astrometric accuracy that could be achieved for future plane-of-sky optical navigation.

  8. Innovation in biological production and upgrading of methane and hydrogen for use as gaseous transport biofuel.

    PubMed

    Xia, Ao; Cheng, Jun; Murphy, Jerry D

    2016-01-01

    Biofuels derived from biomass will play a major role in future renewable energy supplies in transport. Gaseous biofuels have superior energy balances, offer greater greenhouse gas emission reductions and produce lower pollutant emissions than liquid biofuels. Biogas derived through fermentation of wet organic substrates will play a major role in future transport systems. Biogas (which is composed of approximately 60% methane/hydrogen and 40% carbon dioxide) requires an upgrading process to reduce the carbon dioxide content to less than 3% before it is used as compressed gas in transport. This paper reviews recent developments in fermentative biogas production and upgrading as a transport fuel. Third generation gaseous biofuels may be generated using marine-based algae via two-stage fermentation, cogenerating hydrogen and methane. Alternative biological upgrading techniques, such as biological methanation and microalgal biogas upgrading, have the potential to simultaneously upgrade biogas, increase gaseous biofuel yield and reduce carbon dioxide emission. Copyright © 2015 Elsevier Inc. All rights reserved.

  9. Direct Reactions at the Facility for Experiments on Nuclear Reactions in Stars (FENRIS)

    NASA Astrophysics Data System (ADS)

    Longland, Richard; Kelley, John; Marshall, Caleb; Portillo, Federico; Setoodehnia, Kiana

    2017-09-01

    Nuclear cross sections are a key ingredient in stellar models designed to understand how stars evolve. Determining these cross sections, therefore, is critical for obtaining reliable predictions from stellar models. While many charged-particle reaction cross sections can be measured in the laboratory, the Coulomb barrier means that they cannot always be measured at the low energies relevant to astrophysics. In other cases, radioactive targets make the measurements unfeasible. Radioactive ion beam experiments in inverse kinematics are one solution, but low beam intensities mean that cross sections plague these attempts further. Direct measurements, particularly particle transfer experiments, are one tool in our inventory that provides us with the necessary information to infer reaction cross sections at stellar energies. I will present an overview of one facility: the Facility for Experiments on Nuclear Reactions in Stars (FENRIS), which is dedicated to performing particle transfer measurements for astrophysical cross sections. Over the past few years, FENRIS has been fully upgraded and characterized. I will show highlights of our upgrade activities and current capabilities. I will also highlight our recent experimental results and discuss current upgrade efforts.

  10. A Course on Operational Considerations in Wastewater Treatment Plant Design. Instructor's Manual.

    ERIC Educational Resources Information Center

    Cooper, John W.; And Others

    This manual contains 17 instructional units (sequenced to correspond to parallel chapters in a student's manual) focusing on upgrading the design of wastewater plant facilities and serving as a reference source for establishing criteria for upgrading wastewater treatment plants. The manual also furnishes information for modifying plant design to…

  11. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    NASA Astrophysics Data System (ADS)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-05-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  12. Breakthrough Ideas.

    ERIC Educational Resources Information Center

    American School & University, 1996

    1996-01-01

    Describes innovative strategies that schools and universities are using to save money and reshape operations. Focuses on ideas in energy efficiency and facilities improvement, direct purchasing, energy management, retrofitting buildings, ceiling insulation upgrades, automation systems, electric demand programs, facilities programs, warranty…

  13. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  14. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  15. Shuttle optical environment; Proceedings of the Meeting, Washington, DC, April 23, 24, 1981

    NASA Technical Reports Server (NTRS)

    Miller, E. R. (Editor); Fazio, G. G.

    1982-01-01

    The numerical modeling, instrumentation, identification, and procedures to characterize and/or control contamination hazards to equipment used on the Shuttle are discussed. On-orbit pollutants include molecular offgassing and outgassing, particulate material, and substances from thrusters, vents, and leaks. Clean-rooms are being implemented in ground assembly and integration facilities. Attention is given to an upgraded SPACE program for numerically modeling contamination pathways and appropriate procedures to protect instrumentation from film and particulate deposition. Finally, attention is given to military cryogenic IR detectors being employed to quantify the Shuttle thermal and solid pollutant environment on-orbit as a prelude to future operational IR sensors.

  16. Lunar Processing Cabinet 2.0: Retrofitting Gloveboxes into the 21st Century

    NASA Technical Reports Server (NTRS)

    Calaway, M. J.

    2015-01-01

    In 2014, the Apollo 16 Lunar Processing Glovebox (cabinet 38) in the Lunar Curation Laboratory at NASA JSC received an upgrade including new technology interfaces. A Jacobs - Technology Innovation Project provided the primary resources to retrofit this glovebox into the 21st century. NASA Astromaterials Acquisition & Curation Office continues the over 40 year heritage of preserving lunar materials for future scientific studies in state-of-the-art facilities. This enhancement has not only modernized the contamination controls, but provides new innovative tools for processing and characterizing lunar samples as well as supports real-time exchange of sample images and information with the scientific community throughout the world.

  17. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  18. Benchmarking of Improved DPAC Transient Deflagration Analysis Code

    DOE PAGES

    Laurinat, James E.; Hensel, Steve J.

    2017-09-27

    The deflagration pressure analysis code (DPAC) has been upgraded for use in modeling hydrogen deflagration transients. The upgraded code is benchmarked using data from vented hydrogen deflagration tests conducted at the HYDRO-SC Test Facility at the University of Pisa. DPAC originally was written to calculate peak pressures for deflagrations in radioactive waste storage tanks and process facilities at the Savannah River Site. Upgrades include the addition of a laminar flame speed correlation for hydrogen deflagrations and a mechanistic model for turbulent flame propagation, incorporation of inertial effects during venting, and inclusion of the effect of water vapor condensation on vesselmore » walls. In addition, DPAC has been coupled with chemical equilibrium with applications (CEA), a NASA combustion chemistry code. The deflagration tests are modeled as end-to-end deflagrations. As a result, the improved DPAC code successfully predicts both the peak pressures during the deflagration tests and the times at which the pressure peaks.« less

  19. Benchmarking of Improved DPAC Transient Deflagration Analysis Code

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Laurinat, James E.; Hensel, Steve J.

    The deflagration pressure analysis code (DPAC) has been upgraded for use in modeling hydrogen deflagration transients. The upgraded code is benchmarked using data from vented hydrogen deflagration tests conducted at the HYDRO-SC Test Facility at the University of Pisa. DPAC originally was written to calculate peak pressures for deflagrations in radioactive waste storage tanks and process facilities at the Savannah River Site. Upgrades include the addition of a laminar flame speed correlation for hydrogen deflagrations and a mechanistic model for turbulent flame propagation, incorporation of inertial effects during venting, and inclusion of the effect of water vapor condensation on vesselmore » walls. In addition, DPAC has been coupled with chemical equilibrium with applications (CEA), a NASA combustion chemistry code. The deflagration tests are modeled as end-to-end deflagrations. As a result, the improved DPAC code successfully predicts both the peak pressures during the deflagration tests and the times at which the pressure peaks.« less

  20. Environmental assessment, K Pool fish rearing, Hanford Site, Richland, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The US Department of Energy (DOE) has a need to respond to a request to lease facilities at the Hanford Site 100-KE and 100-KW filter plant pools (K Pools) for fish rearing activities. These fish rearing activities would be: (1) business ventures with public and private funds and (2) long-term enhancement and supplementation programs for game fish populations in the Columbia River Basin. The proposed action is to enter into a use permit or lease agreement with the YIN or other parties who would rear fish in the 100-K Area Pools. The proposed action would include necessary piping, pump, andmore » electrical upgrades of the facility; cleaning and preparation of the pools; water withdrawal from the Columbia River, and any necessary water or wastewater treatment; and introduction, rearing and release of fish. Future commercial operations may be included.« less

  1. A Course on Operational Considerations in Wastewater Treatment Plant Design. Student Manual.

    ERIC Educational Resources Information Center

    Stottler, Stag and Associates, San Antonio, TX.

    This manual was designed to furnish information for upgrading the design of wastewater treatment plant facilities and to serve as a resource for establishing criteria for upgrading these plants. The manual also furnishes information for modifying plant design to compensate for current organic and hydraulic overloads and/or to meet more stringent…

  2. The n_TOF facility: Neutron beams for challenging future measurements at CERN

    NASA Astrophysics Data System (ADS)

    Chiaveri, E.; Aberle, O.; Andrzejewski, J.; Audouin, L.; Bacak, M.; Balibrea, J.; Barbagallo, M.; Bečvář, F.; Berthoumieux, E.; Billowes, J.; Bosnar, D.; Brown, A.; Caamaño, M.; Calviño, F.; Calviani, M.; Cano-Ott, D.; Cardella, R.; Casanovas, A.; Cerutti, F.; Chen, Y. H.; Colonna, N.; Cortés, G.; Cortés-Giraldo, M. A.; Cosentino, L.; Damone, L. A.; Diakaki, M.; Domingo-Pardo, C.; Dressler, R.; Dupont, E.; Durán, I.; Fernández-Domínguez, B.; Ferrari, A.; Ferreira, P.; Finocchiaro, P.; Göbel, K.; García, A. R.; Gawlik, A.; Gilardoni, S.; Glodariu, T.; Gonçalves, I. F.; González, E.; Griesmayer, E.; Guerrero, C.; Gunsing, F.; Harada, H.; Heinitz, S.; Heyse, J.; Jenkins, D. G.; Jericha, E.; Käppeler, F.; Kadi, Y.; Kalamara, A.; Kavrigin, P.; Kimura, A.; Kivel, N.; Kokkoris, M.; Krtička, M.; Kurtulgil, D.; Leal-Cidoncha, E.; Lederer, C.; Leeb, H.; Lerendegui-Marco, J.; Meo, S. Lo; Lonsdale, S. J.; Macina, D.; Marganiec, J.; Martínez, T.; Masi, A.; Massimi, C.; Mastinu, P.; Mastromarco, M.; Maugeri, E. A.; Mazzone, A.; Mendoza, E.; Mengoni, A.; Milazzo, P. M.; Mingrone, F.; Musumarra, A.; Negret, A.; Nolte, R.; Oprea, A.; Patronis, N.; Pavlik, A.; Perkowski, J.; Porras, I.; Praena, J.; Quesada, J. M.; Radeck, D.; Rauscher, T.; Reifarth, R.; Rubbia, C.; Ryan, J. A.; Sabaté-Gilarte, M.; Saxena, A.; Schillebeeckx, P.; Schumann, D.; Smith, A. G.; Sosnin, N. V.; Stamatopoulos, A.; Tagliente, G.; Tain, J. L.; Tarifeño-Saldivia, A.; Tassan-Got, L.; Tsinganis, A.; Valenta, S.; Vannini, G.; Variale, V.; Vaz, P.; Ventura, A.; Vlachoudis, V.; Vlastou, R.; Wallner, A.; Warren, S.; Woods, P. J.; Wright, T.; Žugec, P.

    2017-09-01

    The CERN n_TOF neutron beam facility is characterized by a very high instantaneous neutron flux, excellent TOF resolution at the 185 m long flight path (EAR-1), low intrinsic background and coverage of a wide range of neutron energies, from thermal to a few GeV. These characteristics provide a unique possibility to perform high-accuracy measurements of neutron-induced reaction cross-sections and angular distributions of interest for fundamental and applied Nuclear Physics. Since 2001, the n_TOF Collaboration has collected a wealth of high quality nuclear data relevant for nuclear astrophysics, nuclear reactor technology, nuclear medicine, etc. The overall efficiency of the experimental program and the range of possible measurements has been expanded with the construction of a second experimental area (EAR-2), located 20 m on the vertical of the n_TOF spallation target. This upgrade, which benefits from a neutron flux 30 times higher than in EAR-1, provides a substantial extension in measurement capabilities, opening the possibility to collect data on neutron cross-section of isotopes with short half-lives or available in very small amounts. This contribution will outline the main characteristics of the n_TOF facility, with special emphasis on the new experimental area. In particular, we will discuss the innovative features of the EAR-2 neutron beam that make possible to perform very challenging measurements on short-lived radioisotopes or sub-mg samples, out of reach up to now at other neutron facilities around the world. Finally, the future perspectives of the facility will be presented.

  3. Reactivation and upgrade of the NASA Ames 16-Inch Shock Tunnel - Status report

    NASA Technical Reports Server (NTRS)

    Bogdanoff, David W.; Zambrana, Horacio A.; Cavolowsky, John A.; Newfield, Mark E.; Cornelison, Charles J.; Miller, Robert J.

    1992-01-01

    The NASA Ames 16-Inch Shock Tunnel has been reactivated after seventeen years of inactivity. In the years before deactivating the facility, it was operated at enthalpies of 4,700 J/gm and pressures up to 260 atm or at enthalpies of 1900 J/gm over a wide pressure range. Since reactivating, the facility has been operated at enthalpies up to 12,000 J/gm and pressures up to 408 atm. The present paper describes the steps taken in upgrading the facility and summarizes the currently achievable conditions. The selection of the driver gas, the steps taken to improve the driver burn, and the diaphragm opening techniques are described. The pressure and heat flux instrumentation, the optical diagnostics and the data acquisition system are also described.

  4. Mitigating risks related to facilities management.

    PubMed

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  5. High resolution upgrade of the ATF damping ring BPM system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Terunuma, N.; Urakawa, J.; /KEK, Tsukuba

    2008-05-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R&D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented.

  6. The ISOLDE facility and the HIE-HISOLDE project: Recent highlights

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borge, M. J. G.

    2014-07-23

    The ISOLDE facility at CERN has as objective the production, study and research of nuclei far from stability. The facility provides low energy radioactive beams and post-accelerated beams. In the last 45 years the ISOLDE facility has gathered unique expertise in research with radioactive beams. Over 700 isotopes of more than 70 elements have been used in a wide range of research domains, including cutting edge studies in nuclear structure, atomic physics, nuclear astrophysics, and fundamental interactions. These nuclear probes are also used to do frontier research in solid state and life sciences. There is an on-going upgrade of themore » facility, the HIE-ISOLDE project, which aims to improve the ISOLDE capabilities in a wide front, from an energy increase of the post-accelerated beam to improvements in beam quality and beam purity. The first phase of HIE-ISOLDE will start for physics in the autumn of 2015 with an upgrade of energy for all post-accelerated ISOLDE beams up to 5.5 MeV/u. In this contribution the most recent highlights of the facility are presented.« less

  7. Design and implementation of an improved chilled water glycol system for NICI array electronics thermal enclosure

    NASA Astrophysics Data System (ADS)

    Gausachs, Gaston

    2008-07-01

    The Near Infrared Chronographic Imager (NICI) being commissioned at Gemini was upgraded with a more powerful Chilled Water Glycol System to address early overheating problems. The previous system was replaced with a completely new design favoring improved airflow and increased heat transfer capabilities. The research leading to this upgrade showed a significant lack of cooling power of the original design. The solution was a combination of commercial heat exchanger and fans and a custom built enclosure. As a prime infrared telescope facility, Gemini is very much interested in maintaining the least amount of heat dissipated to the ambient air. The results obtained through the implementation of this solution will be helpful in understanding the state of other existing electronics enclosures as well as those for new instruments to come. With the advent of electronic intensive AO systems, future electronics enclosures must take full advantage of improved cooling. This paper describes the design and implementation phases of the project. The results under maximum operating capacity proved to be within the expected theoretical values and were deemed successful.

  8. Realizing software longevity over a system's lifetime

    NASA Astrophysics Data System (ADS)

    Lanclos, Kyle; Deich, William T. S.; Kibrick, Robert I.; Allen, Steven L.; Gates, John

    2010-07-01

    A successful instrument or telescope will measure its productive lifetime in decades; over that period, the technology behind the control hardware and software will evolve, and be replaced on a per-component basis. These new components must successfully integrate with the old, and the difficulty of that integration depends strongly on the design decisions made over the course of the facility's history. The same decisions impact the ultimate success of each upgrade, as measured in terms of observing efficiency and maintenance cost. We offer a case study of these critical design decisions, analyzing the layers of software deployed for instruments under the care of UCO/Lick Observatory, including recent upgrades to the Low Resolution Imaging Spectrometer (LRIS) at Keck Observatory in Hawaii, as well as the Kast spectrograph, Lick Adaptive Optics system, and Hamilton spectrograph, all at Lick Observatory's Shane 3-meter Telescope at Mt. Hamilton. These issues play directly into design considerations for the software intended for use at the next generation of telescopes, such as the Thirty Meter Telescope. We conduct our analysis with the future of observational astronomy infrastructure firmly in mind.

  9. Real-time analysis system for gas turbine ground test acoustic measurements.

    PubMed

    Johnston, Robert T

    2003-10-01

    This paper provides an overview of a data system upgrade to the Pratt and Whitney facility designed for making acoustic measurements on aircraft gas turbine engines. A data system upgrade was undertaken because the return-on-investment was determined to be extremely high. That is, the savings on the first test series recovered the cost of the hardware. The commercial system selected for this application utilizes 48 input channels, which allows either 1/3 octave and/or narrow-band analyses to be preformed real-time. A high-speed disk drive allows raw data from all 48 channels to be stored simultaneously while the analyses are being preformed. Results of tests to ensure compliance of the new system with regulations and with existing systems are presented. Test times were reduced from 5 h to 1 h of engine run time per engine configuration by the introduction of this new system. Conservative cost reduction estimates for future acoustic testing are 75% on items related to engine run time and 50% on items related to the overall length of the test.

  10. Implementation of the MPC and A Operations Monitorying (MOM) System at JSC PO Sevmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Monogarov, A.; Taranenko, V.; Serov,A

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the JSC 'PO' Sevmash', Severodvinsk, Russia. The MOM system was made operational at Sevmash in September, 2008. This paper will discuss the objectives of the MOM system installed at Sevmash and indicate how the objectives influenced the development of the conceptual design. The paper will also describe activities related to installation of the infrastructure and the MOM system at Sevmash. Experience gained from operation of the system and how the objectives are being met will also be discussed. The paper will describe how the MOM system is used at Sevmash and, in particular, how the data is analyzed. Finally, future activities including potential expansion of the MOM system, operator training, data sharing and analysis, procedure development, repair and maintenance will be included in the paper.« less

  11. CSU's MWV Observatory: A Facility for Research, Education and Outreach

    NASA Astrophysics Data System (ADS)

    Hood, John; Carpenter, N. D.; McCarty, C. B.; Samford, J. H.; Johnson, M.; Puckett, A. W.; Williams, R. N.; Cruzen, S. T.

    2014-01-01

    The Mead Westvaco Observatory (MWVO), located in Columbus State University's Coca-Cola Space Science Center, is dedicated to education and research in astronomy through hands-on engagement and public participation. The MWVO has recently received funding to upgrade from a 16-inch Meade LX-200 telescope to a PlaneWave CDK 24-inch Corrected Dall-Kirkham Astrograph telescope. This and other technological upgrades will allow this observatory to stream live webcasts for astronomical events, allowing a worldwide public audience to become a part of the growing astronomical community. This poster will explain the upgrades that are currently in progress as well as the results from the current calibrations. The goal of these upgrades is to provide facilities capable of both research-class projects and widespread use in education and public outreach. We will present our initial calibration and tests of the observatory equipment, as well as its use in webcasts of astronomical events, in solar observing through the use of specialized piggy-backed telescopes, and in research into such topics as asteroids, planetary and nebula imaging. We will describe a pilot research project on asteroid orbit refinement and light curves, to be carried out by Columbus State University students. We will also outline many of the K-12 educational and public outreach activities we have designed for these facilities. Support and funding for the acquisition and installation of the new PlaneWave CDK 24 has been provided by the International Museum and Library Services via the Museums for America Award.

  12. Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

    NASA Technical Reports Server (NTRS)

    Webb, Andrew T.; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  13. Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

    NASA Technical Reports Server (NTRS)

    Webb, Andrew

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  14. Modular Filter and Source-Management Upgrade of RADAC

    NASA Technical Reports Server (NTRS)

    Lanzi, R. James; Smith, Donna C.

    2007-01-01

    In an upgrade of the Range Data Acquisition Computer (RADAC) software, a modular software object library was developed to implement required functionality for filtering of flight-vehicle-tracking data and management of tracking-data sources. (The RADAC software is used to process flight-vehicle metric data for realtime display in the Wallops Flight Facility Range Control Center and Mobile Control Center.)

  15. New hypersonic facility capability at NASA Lewis Research Center

    NASA Technical Reports Server (NTRS)

    Haas, Jeffrey E.; Chamberlin, Roger; Dicus, John H.

    1989-01-01

    Four facility activities are underway at NASA Lewis Research Center to develop new hypersonic propulsion test capability. Two of these efforts consist of upgrades to existing operational facilities. The other two activities will reactivate facilities that have been in a standby condition for over 15 years. These four activities are discussed and the new test facilities NASA Lewis will have in place to support evolving high speed research programs are described.

  16. Nitrogen removal process optimization in New York City WPCPS: a case study of Wards Island WPCP.

    PubMed

    Ramalingam, K; Fillos, J; Musabyimana, M; Deur, A; Beckmann, K

    2009-01-01

    The New York City Department of Environmental Protection has been engaged in a continuous process to develop a nitrogen removal program to reduce the nitrogen mass discharge from its water pollution control plants, (WPCPs), from 49,158 kg/d to 20,105 kg/d by the year 2017 as recommended by the Long Island Sound Study. As part of the process, a comprehensive research effort was undertaken involving bench, pilot and full scale studies to identify the most effective way to upgrade and optimize the existing WPCPs. Aeration tank 13 (AT-13) at the Wards Island WPCP was particularly attractive as a full-scale research facility because its aeration tank with its dedicated final settling tanks and RAS pumps could be isolated from the remaining treatment facilities. The nitrogen removal performance of AT-13, which, at the time, was operated as a "basic step feed BNR Facility", was evaluated and concurrently nitrification kinetic parameters were measured using in-situ bench scale experiments. Additional bench scale experiments provided denitrification rates using different sources of carbon and measurement of the maximum specific growth rate of nitrifying bacteria. The combined findings were then used to upgrade AT-13 to a "full" BNR facility with carbon and alkalinity addition. This paper will focus on the combined bench and full scale results that were the basis for the consequent upgrade.

  17. The ESS neutrino facility for CP violation discovery

    NASA Astrophysics Data System (ADS)

    Baussan, Eric; Bouquerel, Elian; Dracos, Marcos

    2017-09-01

    The comparatively large value of the neutrino mixing angle θ 13 measured in 2012 by neutrino reactor experiments has opened the possibility to observe for the first time CP violation in the leptonic sector. The measured value of θ 13 also privileges the 2nd oscillation maximum for the discovery of CP violation instead of the usually used 1st oscillation maximum. The sensitivity at the 2nd oscillation maximum is about three times higher than at the 1st oscillation maximum implying a significantly lower sensitivity to systematic errors. Measuring at the 2nd oscillation maximum necessitates a very intense neutrino beam with the appropriate energy. The world’s most intense pulsed spallation neutron source, the European Spallation Source, has a proton linac with 5 MW power and 2 GeV energy. This linac also has the potential to become the proton driver of the world’s most intense neutrino beam with very high potential for the discovery of neutrino CP violation. The physics performance of that neutrino Super Beam in conjunction with a megaton Water Cherenkov neutrino detector installed ca 1000 m down in a mine at a distance of about 500 km from ESS has been evaluated. In addition, the use of such a detector will make it possible to extent the physics program to proton decay, atmospheric neutrinos and astrophysics searches. The ESS proton linac upgrade, the accumulator ring needed for proton pulse compression, the target station optimization and the physics potential are described. In addition to the production of neutrinos, this facility will also be a copious source of muons which could be used to feed a low energy nuSTORM facility, a future neutrino factory or a muon collider. The ESS linac, under construction, will reach full operation at 5 MW by 2023 after which the upgrades for the neutrino facility could start.

  18. Linam Ranch cryogenic gas plant: A design and operating retrospective

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harwell, L.J.; Kuscinski, J.

    1999-07-01

    GPM Gas Corporation's Linam Ranch Gas Plant is the processing hub of their southeastern New Mexico gathering system, producing a y-grade NGL product which is pipelined primarily to the Phillips petrochemical complex at Sweeney, Texas, GPM acquired the facility near Hobbs, N.M. late in 1994 when it was still operating as a refrigerated lean oil plant, renamed it, and commenced an upgrade project culminating in its conversion to a high recovery cryogenic facility in early 1996 with a processing capacity of 150 MMscfd. Facilities that were upgraded included inlet liquids receiving and handling, the amine system, mol sieve dehydration, themore » sulfur recovery unit, inlet compression, and the propane refrigeration system. A Foxboro I/A DCS was also placed into operation. The lean oil system was replaced with a high recovery turboexpander unit supplied by KTI Fish based on their Flash Vapor Reflux (FVR) process. Resulting ethane recovery was greater than 95% for the new facilities. New residue compression units were installed including steam generators on the turbine exhausts, which complemented the existing plant steam system. During the three years since conversion to cryogenic operation, GPM has steadily improved plant operations. Expansion of the mol sieve dehydration system and retrofit of evaporation combustion air cooling on gas turbines have expanded nameplate capacity to 170 MMscfd while maintaining ethane recovery at 95%. Future expansion to 200 MMscfd with high recovery is achievable. In addition, creative use of the Foxboro DCS has been employed to implement advanced control schemes for handling inlet liquid slugs, gas and amine balancing for parallel amine contactors, improved sulfur recovery unit (SRU) trim air control, and constraint-based process optimization to maximize horsepower utilization and ethane recovery. Some challenges remain, leaving room for additional improvements. However, GPM's progress so far has resulted in a current ethane recovery level in excess of 97% when processing gas at the original design throughput of 150 MMscfd.« less

  19. The status of the SNS external antenna ion source and spare RFQ test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Welton, R. F., E-mail: welton@ornl.gov; Aleksandrov, A. V.; Han, B. X.

    The Oak Ridge National Laboratory operates the Spallation Neutron Source, consisting of a H{sup −} ion source, a 1 GeV linac and an accumulator ring. The accumulated <1 μs-long, ∼35 A beam pulses are extracted from the ring at 60 Hz and directed onto a liquid Hg target. Spalled neutrons are directed to ∼20 world class instruments. Currently, the facility operates routinely with ∼1.2 MW of average beam power, which soon will be raised to 1.4 MW. A future upgrade with a second target station calls for raising the power to 2.8 MW. This paper describes the status of twomore » accelerator components expected to play important roles in achieving these goals: a recently acquired RFQ accelerator and the external antenna ion source. Currently, the RFQ is being conditioned in a newly constructed 2.5 MeV Integrated Test Facility (ITF) and the external antenna source is also being tested on a separate test stand. This paper presents the results of experiments and the testing of these systems.« less

  20. Mechanical design of thin-film diamond crystal mounting apparatus for coherence preservation hard x-ray optics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shu, Deming, E-mail: shu@aps.anl.gov; Shvyd’ko, Yuri V.; Stoupin, Stanislav

    2016-07-27

    A new thin-film diamond crystal mounting apparatus has been designed at the Advanced Photon Source (APS) for coherence preservation hard x-ray optics with optimized thermal contact and minimized crystal strain. This novel mechanical design can be applied to new development in the field of: x-ray optics cavities for hard x-ray free-electron laser oscillators (XFELOs), self-seeding monochromators for hard x-ray free-electron laser (XFEL) with high average thermal loading, high heat load diamond crystal monochromators and beam-sharing/beam-split-and-delay devices for XFEL facilities and future upgraded high-brightness coherent x-ray source in the MBA lattice configuration at the APS.

  1. A new AMS facility in Caserta/Italy

    NASA Astrophysics Data System (ADS)

    Terrasi, F.; Rogalla, D.; De Cesare, N.; D'Onofrio, A.; Lubritto, C.; Marzaioli, F.; Passariello, I.; Rubino, M.; Sabbarese, C.; Casa, G.; Palmieri, A.; Gialanella, L.; Imbriani, G.; Roca, V.; Romano, M.; Sundquist, M.; Loger, R.

    2007-06-01

    A new AMS system has been installed at Center for Isotopic Research on Cultural and Environmental Heritage (CIRCE) in Caserta/Italy. It was built by National Electrostatics Corp. Middleton, WI/USA, and arrived at CIRCE in the middle of January 2005; the installation and the acceptance tests were completed at the end of February 2005. At first, the system is intended for Radiocarbon AMS; for future Al and Be AMS only minor upgrades are needed and the magnets are designed to bend heavy isotopes like Uranium. Concerning Radiocarbon AMS, the first measurements of unknown samples, prepared in the internal preparation laboratory, already yielded results of high precision and 14C dating is in full swing.

  2. Summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Danny H; Elwood Jr, Robert H

    2011-01-01

    An effective risk assessment system is needed to address the threat posed by an active or passive insider who, acting alone or in collusion, could attempt diversion or theft of nuclear material. The material control and accountability (MC&A) system effectiveness tool (MSET) is a self-assessment or inspection tool utilizing probabilistic risk assessment (PRA) methodology to calculate the system effectiveness of a nuclear facility's material protection, control, and accountability (MPC&A) system. The MSET process is divided into four distinct and separate parts: (1) Completion of the questionnaire that assembles information about the operations of every aspect of the MPC&A system; (2)more » Conversion of questionnaire data into numeric values associated with risk; (3) Analysis of the numeric data utilizing the MPC&A fault tree and the SAPHIRE computer software; and (4) Self-assessment using the MSET reports to perform the effectiveness evaluation of the facility's MPC&A system. The process should lead to confirmation that mitigating features of the system effectively minimize the threat, or it could lead to the conclusion that system improvements or upgrades are necessary to achieve acceptable protection against the threat. If the need for system improvements or upgrades is indicated when the system is analyzed, MSET provides the capability to evaluate potential or actual system improvements or upgrades. A facility's MC&A system can be evaluated at a point in time. The system can be reevaluated after upgrades are implemented or after other system changes occur. The total system or specific subareas within the system can be evaluated. Areas of potential system improvement can be assessed to determine where the most beneficial and cost-effective improvements should be made. Analyses of risk importance factors show that sustainability is essential for optimal performance and reveals where performance degradation has the greatest impact on total system risk. The risk importance factors show the amount of risk reduction achievable with potential upgrades and the amount of risk reduction achieved after upgrades are completed. Applying the risk assessment tool gives support to budget prioritization by showing where budget support levels must be sustained for MC&A functions most important to risk. Results of the risk assessment are also useful in supporting funding justifications for system improvements that significantly reduce system risk. The functional model, the system risk assessment tool, and the facility evaluation questionnaire are valuable educational tools for MPC&A personnel. These educational tools provide a framework for ongoing dialogue between organizations regarding the design, development, implementation, operation, assessment, and sustainability of MPC&A systems. An organization considering the use of MSET as an analytical tool for evaluating the effectiveness of its MPC&A system will benefit from conducting a complete MSET exercise at an existing nuclear facility.« less

  3. Systems Engineering and Integration (SE and I)

    NASA Technical Reports Server (NTRS)

    Chevers, ED; Haley, Sam

    1990-01-01

    The issue of technology advancement and future space transportation vehicles is addressed. The challenge is to develop systems which can be evolved and improved in small incremental steps where each increment reduces present cost, improves, reliability, or does neither but sets the stage for a second incremental upgrade that does. Future requirements are interface standards for commercial off the shelf products to aid in the development of integrated facilities; enhanced automated code generation system slightly coupled to specification and design documentation; modeling tools that support data flow analysis; and shared project data bases consisting of technical characteristics cast information, measurement parameters, and reusable software programs. Topics addressed include: advanced avionics development strategy; risk analysis and management; tool quality management; low cost avionics; cost estimation and benefits; computer aided software engineering; computer systems and software safety; system testability; and advanced avionics laboratories - and rapid prototyping. This presentation is represented by viewgraphs only.

  4. Kongiganak Wind Turbine Replacement and System Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boonstra, Patrick

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  5. 75 FR 13340 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ...--design and construction. Terminal facility improvements--design and construction. Runway pavement overlay... Collection at CHS and Use at CHS: Upgrade police radio communications. Design flight/baggage information... expansion--design. Standardize airfield signage. Restripe airfield taxiway and ramp edge. Improve airport...

  6. Status report on the activities of National Balloon Facility at Hyderabad

    NASA Astrophysics Data System (ADS)

    Shankarnarayan, Sreenivasan; S, Sreenivasan; Shankarnarayan, Sreenivasan; Manchanda, R. K.; Subba Rao Jonnalagadda, Venkata; Buduru, Suneelkumar

    National balloon facility at Hyderabad has been mandated to provide launch support for Indian and International scientific balloon experiments and also perform the necessary research and development in the design and fabrication of plastic balloons. In the last 4 years, since our last report, NBF has launched many successful balloon flights for the astronomy payloads and a large number of high altitude GPS Sonde flights at different places in the country. We have also continued our efforts on qualification of raw materials for zero-failure performance of our balloons and major focus on upgrading of various facilities and load-line instrumentation for launching from remote sites. We foresee a surge of balloon based experimental activity for in-situ measurements in atmospheric sciences and concept validation payloads for future space based instruments. A new centre for research in Environmental Sciences and Payload Engineering (ESPE) has also been set up at the National Balloon Facility campus to develop and conduct research in various aspects of Environmental sciences in collaboration with other groups, with a specific goal to identify, development of advanced technologies leading to an improved understanding of the earth system. The Payload Engineering facility is geared to the Design and Fabrication of Micro and Nano Satellites and will act as Inter -University Centre for payload fabrication. In this paper we present an overview of the present and planned activities in scientific ballooning at National Balloon Facility Hyderabad.

  7. Effects of wastewater effluent discharge and treatment facility upgrades on environmental and biological conditions of the upper Blue River, Johnson County, Kansas and Jackson County, Missouri, January 2003 through March 2009

    USGS Publications Warehouse

    Graham, Jennifer L.; Stone, Mandy L.; Rasmussen, Teresa J.; Poulton, Barry C.

    2010-01-01

    The Johnson County Blue River Main Wastewater Treatment Facility discharges into the upper Blue River near the border between Johnson County, Kansas and Jackson County, Missouri. During 2005 through 2007 the wastewater treatment facility underwent upgrades to increase capacity and include biological nutrient removal. The effects of wastewater effluent on environmental and biological conditions of the upper Blue River were assessed by comparing an upstream site to two sites located downstream from the wastewater treatment facility. Environmental conditions were evaluated using previously and newly collected discrete and continuous data, and were compared with an assessment of biological community composition and ecosystem function along the upstream-downstream gradient. This evaluation is useful for understanding the potential effects of wastewater effluent on water quality, biological community structure, and ecosystem function. In addition, this information can be used to help achieve National Pollution Discharge Elimination System (NPDES) wastewater effluent permit requirements after additional studies are conducted. The effects of wastewater effluent on the water-quality conditions of the upper Blue River were most evident during below-normal and normal streamflows (about 75 percent of the time), when wastewater effluent contributed more than 20 percent to total streamflow. The largest difference in water-quality conditions between the upstream and downstream sites was in nutrient concentrations. Total and inorganic nutrient concentrations at the downstream sites during below-normal and normal streamflows were 4 to 15 times larger than at the upstream site, even after upgrades to the wastewater treatment facility were completed. However, total nitrogen concentrations decreased in wastewater effluent and at the downstream site following wastewater treatment facility upgrades. Similar decreases in total phosphorus were not observed, likely because the biological phosphorus removal process was not optimized until after the study was completed. Total nitrogen and phosphorus from the wastewater treatment facility contributed a relatively small percentage (14 to 15 percent) to the annual nutrient load in the upper Blue River, but contributed substantially (as much as 75 percent) to monthly loads during seasonal low-flows in winter and summer. During 2007 and 2008, annual discharge from the wastewater treatment facility was about one-half maximum capacity, and estimated potential maximum annual loads were 1.6 to 2.4 times greater than annual loads before capacity upgrades. Even when target nutrient concentrations are met, annual nutrient loads will increase when the wastewater treatment facility is operated at full capacity. Regardless of changes in annual nutrient loads, the reduction of nutrient concentrations in the Blue River Main wastewater effluent will help prevent further degradation of the upper Blue River. The Blue River Main Wastewater Treatment Facility wastewater effluent caused changes in concentrations of several water-quality constituents that may affect biological community structure and function including larger concentrations of bioavailable nutrients (nitrate and orthophosphorus) and smaller turbidities. Streambed-sediment conditions were similar along the upstream-downstream gradient and measured constituents did not exceed probable effect concentrations. Habitat conditions declined along the upstream-downstream gradient, largely because of decreased canopy cover and riparian buffer width and increased riffle-substrate fouling. Algal biomass, primary production, and the abundance of nutrient-tolerant diatoms substantially increased downstream from the wastewater treatment facility. Likewise, the abundance of intolerant macroinvertebrate taxa and Kansas Department of Health and Environment aquatic-life-support scores, derived from macroinvertebrate data, significantly decreased downstream from the wastewater

  8. Marshall Space Flight Center's Impact Testing Facility Capabilities

    NASA Technical Reports Server (NTRS)

    Evans, Steve; Finchum, Andy; Hubbs, Whitney; Gray, Perry

    2008-01-01

    Marshall Space Flight Center's (MSFC) Impact Testing Facility (ITF) serves as an important installation for space and missile related materials science research. The ITF was established and began its research in spacecraft debris shielding in the early 1960s, then played a major role in the International Space Station debris shield development. As NASA became more interested in launch debris and in-flight impact concerns, the ITF grew to include research in a variety of impact genres. Collaborative partnerships with the DoD led to a wider range of impact capabilities being relocated to MSFC as a result of the closure of Particle Impact Facilities in Santa Barbara, California, The Particle Impact Facility had a 30 year history in providing evaluations of aerospace materials and components during flights through rain, ice, and solid particle environments at subsonic through hypersonic velocities. The facility's unique capabilities were deemed a 'National Asset' by the DoD, The ITF now has capabilities including environmental, ballistic, and hypervelocity impact testing utilizing an array of air, powder, and two-stage light gas guns to accommodate a variety of projectile and target types and sizes. Relocated test equipment was dated and in need of upgrade. Numerous upgrades including new instrumentation, triggering circuitry, high speed photography, and optimized sabot designs have been implemented. Other recent research has included rain drop demise characterization tests to obtain data for inclusion in on-going model development. Future ITF improvements will be focused on continued instrumentation and performance enhancements. These enhancements will allow further, more in-depth, characterization of rain drop demise characterization and evaluation of ice crystal impact. Performance enhancements also include increasing the upper velocity limit of the current environmental guns to allow direct environmental simulation for missile components. The current and proposed ITF capabilities range from rain to micrometeoroids allowing the widest test parameter range possible for materials investigations in support of space, atmospheric, and ground environments. These test capabilities including hydrometeor, single/multi-particle, ballistic gas guns, exploding wire gun, and light gas guns combined with Smooth Particle Hydrodynamics Code (SPHC) simulations represent the widest range of impact test capabilities in the country.

  9. Marshall Space Flight Center's Impact Testing Facility Capabilities

    NASA Technical Reports Server (NTRS)

    Evans, Steve; Finchum, Andy; Hubbs, Whitney

    2008-01-01

    Marshall Space Flight Center's (MSFC) Impact Testing Facility (ITF) serves as an important installation for space and missile related materials science research. The ITF was established and began its research in spacecraft debris shielding in the early 1960% then played a major role in the International Space Station debris shield development. As NASA became more interested in launch debris and in-flight impact concerns, the ITF grew to include research in a variety of impact genres. Collaborative partnerships with the DoD led to a wider range of impact capabilities being relocated to MSFC as a result of the closure of Particle Impact Facilities in Santa Barbara, California. The Particle Impact Facility had a 30 year history in providing evaluations of aerospace materials and components during flights through rain, ice, and solid particle environments at subsonic through hypersonic velocities. The facility's unique capabilities were deemed a "National Asset" by the DoD. The ITF now has capabilities including environmental, ballistic, and hypervelocity impact testing utilizing an array of air, powder, and two-stage light gas guns to accommodate a variety of projectile and target types and sizes. Relocated test equipment was dated and in need of upgrade. Numerous upgrades including new instrumentation, triggering circuitry, high speed photography, and optimized sabot designs have been implemented. Other recent research has included rain drop demise characterization tests to obtain data for inclusion in on-going model development. Future ITF improvements will be focused on continued instrumentation and performance enhancements. These enhancements will allow further, more in-depth, characterization of rain drop demise characterization and evaluation of ice crystal impact. Performance enhancements also include increasing the upper velocity limit of the current environmental guns to allow direct environmental simulation for missile components. The current and proposed ITF capabilities range from rain to micrometeoroids allowing the widest test parameter range possible for materials investigations in support of space, atmospheric, and ground environments. These test capabilities including hydrometeor, single/multi-particle, ballistic gas grins, exploding wire gun, and light gas guns combined with Smooth Particle Hydrodynamics Code (SPHC) simulations represent the widest range of impact test capabilities in the country.

  10. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  11. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  12. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  13. 23 CFR 645.105 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... phase of a project. The date of authorization establishes the date of eligibility for Federal funds to participate in the costs incurred on that phase of work. Betterment—any upgrading of the facility being... new location, moving, rearranging or changing the type of existing facilities and taking any necessary...

  14. 40 CFR 256.23 - Requirements for closing or upgrading open dumps.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid... classification of existing solid waste disposal facilities according to the criteria. This classification shall... solid waste disposal facility; (2) The availability of State regulatory and enforcement powers; and (3...

  15. 40 CFR 256.23 - Requirements for closing or upgrading open dumps.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid... classification of existing solid waste disposal facilities according to the criteria. This classification shall... solid waste disposal facility; (2) The availability of State regulatory and enforcement powers; and (3...

  16. Analysis of Energy Industry Upgrading in Northeast China

    NASA Astrophysics Data System (ADS)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Geet, Otto

    NREL has developed a methodology to prioritize which data center cooling systems could be upgraded for better efficiency based on estimated cost savings and economics. The best efficiency results are in cool or dry climates where 'free' economizer or evaporative cooling can provide most of the data center cooling. Locations with a high cost of energy and facilities with high power usage effectiveness (PUE) are also good candidates for data center cooling system upgrades. In one case study of a major cable provider's data centers, most of the sites studied had opportunities for cost-effective cooling system upgrades with payback periodmore » of 5 years or less. If the cable provider invested in all opportunities for upgrades with payback periods of less than 15 years, it could save 27% on annual energy costs.« less

  18. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

    NASA Technical Reports Server (NTRS)

    Emrich, William J. Jr.; Moran, Robert P.; Pearson, J. Boise

    2012-01-01

    To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities

  19. Generic particulate-monitoring system for retrofit to Hanford exhaust stacks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Camman, J.W.; Carbaugh, E.H.

    1982-11-01

    Evaluations of 72 sampling and monitoring systems were performed at Hanford as the initial phase of a program to upgrade such systems. Each evaluation included determination of theoretical sampling efficiencies for particle sizes ranging from 0.5 to 10 micrometers aerodynamic equivalent diameter, addressing anisokinetic bias, sample transport line losses, and collector device efficiency. Upgrades needed to meet current Department of Energy guidance for effluent sampling and monitoring were identified, and a cost for each upgrade was estimated. A relative priority for each system's upgrade was then established based on evaluation results, current operational status, and future plans for the facilitymore » being exhausted. Common system upgrade requirements lead to the development of a generic design for common components of an exhaust stack sampling and monitoring system for airborne radioactive particulates. The generic design consists of commercially available off-the-shelf components to the extent practical and will simplify future stack sampling and monitoring system design, fabrication, and installation efforts. Evaluation results and their significance to system upgrades are empasized. A brief discussion of the analytical models used and experience to date with the upgrade program is included. Development of the generic stack sampling and monitoring system design is outlined. Generic system design features and limitations are presented. Requirements for generic system retrofitting to existing exhaust stacks are defined and benefits derived from generic system application are discussed.« less

  20. Rehabilitation of the Rocket Vehicle Integration Test Stand at Edwards Air Force Base

    NASA Technical Reports Server (NTRS)

    Jones, Daniel S.; Ray, Ronald J.; Phillips, Paul

    2005-01-01

    Since initial use in 1958 for the X-15 rocket-powered research airplane, the Rocket Engine Test Facility has proven essential for testing and servicing rocket-powered vehicles at Edwards Air Force Base. For almost two decades, several successful flight-test programs utilized the capability of this facility. The Department of Defense has recently demonstrated a renewed interest in propulsion technology development with the establishment of the National Aerospace Initiative. More recently, the National Aeronautics and Space Administration is undergoing a transformation to realign the organization, focusing on the Vision for Space Exploration. These initiatives provide a clear indication that a very capable ground-test stand at Edwards Air Force Base will be beneficial to support the testing of future access-to-space vehicles. To meet the demand of full integration testing of rocket-powered vehicles, the NASA Dryden Flight Research Center, the Air Force Flight Test Center, and the Air Force Research Laboratory have combined their resources in an effort to restore and upgrade the original X-15 Rocket Engine Test Facility to become the new Rocket Vehicle Integration Test Stand. This report describes the history of the X-15 Rocket Engine Test Facility, discusses the current status of the facility, and summarizes recent efforts to rehabilitate the facility to support potential access-to-space flight-test programs. A summary of the capabilities of the facility is presented and other important issues are discussed.

  1. The Explosive Pulsed Power Test Facility at AFRL

    DTIC Science & Technology

    2005-06-01

    Air Force Research Laboratory , AFRL /DEHP, Albuquerque...NM 87117 S. Coffey, A. Brown, B. Guffey NumerEx, Albuquerque, NM Abstract The Air Force Research Laboratory has developed and tested a...Chestnut Site on Kirtland Air Force Base. The facility is described in this paper, including details of recent upgrades. I.

  2. Building Renovation in ARL Libraries. SPEC Kit 97.

    ERIC Educational Resources Information Center

    Hersberger, Rodney M.

    This collection of library documents related to building renovation, by members of the Association of Research Libraries (ARL), contains excerpts from: (1) a plan for upgrading and expanding library facilities at the University of Kansas; (2) a report on storage facilities at Rutgers University; (3) documents presenting the essential remodeling…

  3. The current status and future upgrade of the PDS at the Royal Greenwich Observatory

    NASA Technical Reports Server (NTRS)

    Vanbreda, I. G.; Davies, H. E.; Penny, A. J.; Pike, C. D.

    1984-01-01

    Various aspects of the performance of the PDS 1010A microdensitometer are described. The primary points in an upgrade propsal for the unit are outlined. Photometric instabilities in the PDS are mentioned.

  4. Next Generation H- Ion Sources for the SNS

    NASA Astrophysics Data System (ADS)

    Welton, R. F.; Stockli, M. P.; Murray, S. N.; Crisp, D.; Carmichael, J.; Goulding, R. H.; Han, B.; Tarvainen, O.; Pennisi, T.; Santana, M.

    2009-03-01

    The U.S. Spallation Neutron Source (SNS) is the leading accelerator-based, pulsed neutron-scattering facility, currently in the process of ramping up neutron production. In order to insure meeting operational requirements as well as providing for future facility beam power upgrades, a multifaceted H- ion source development program is ongoing. This work discusses several aspects of this program, specifically the design and first beam measurements of an RF-driven, external antenna H- ion source based on an A1N ceramic plasma chamber, elemental and chromate Cs-systems, and plasma ignition gun. Unanalyzed beam currents of up to ˜100 mA (60 Hz, 1 ms) have been observed and sustained currents >60 mA (60 Hz, 1 ms) have been demonstrated on the test stand. Accelerated beam currents of ˜40 mA have also been demonstrated into the SNS front end. Data are also presented describing the first H- beam extraction experiments from a helicon plasma generator based on the Variable Specific Impulse Magnetoplasma Rocket (VASIMR) engine design.

  5. Natural phenomena hazards design and evaluation criteria for Department of Energy Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This DOE standard gives design and evaluation criteria for natural phenomena hazards (NPH) effects as guidance for implementing the NPH mitigation requirements of DOE 5480.28. Goal of the criteria is to assure that DOE facilities can withstand the effects of earthquakes, extreme winds, tornadoes, flooding, etc. They apply to the design of new facilities and the evaluation of existing facilities; they may also be used for modification and upgrading of the latter.

  6. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    NASA Astrophysics Data System (ADS)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  7. Micros for the 1990's: An Update.

    ERIC Educational Resources Information Center

    Grosch, Audrey N.

    1991-01-01

    Discusses new hardware and software developments for microcomputers and considers strategies for future library microcomputing. Topics discussed include developments with Macintosh computers; the importance of local area networks (LANs); upgrading options for hardware; operating system upgrades; dynamic data exchange (DDE); microcomputer…

  8. Game theoretic analysis of physical protection system design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Canion, B.; Schneider, E.; Bickel, E.

    The physical protection system (PPS) of a fictional small modular reactor (SMR) facility have been modeled as a platform for a game theoretic approach to security decision analysis. To demonstrate the game theoretic approach, a rational adversary with complete knowledge of the facility has been modeled attempting a sabotage attack. The adversary adjusts his decisions in response to investments made by the defender to enhance the security measures. This can lead to a conservative physical protection system design. Since defender upgrades were limited by a budget, cost benefit analysis may be conducted upon security upgrades. One approach to cost benefitmore » analysis is the efficient frontier, which depicts the reduction in expected consequence per incremental increase in the security budget.« less

  9. Fuel quality/processing study. Volume 3: Fuel upgrading studies

    NASA Technical Reports Server (NTRS)

    Jones, G. E., Jr.; Bruggink, P.; Sinnett, C.

    1981-01-01

    The methods used to calculate the refinery selling prices for the turbine fuels of low quality are described. Detailed descriptions and economics of the upgrading schemes are included. These descriptions include flow diagrams showing the interconnection between processes and the stream flows involved. Each scheme is in a complete, integrated, stand alone facility. Except for the purchase of electricity and water, each scheme provides its own fuel and manufactures, when appropriate, its own hydrogen.

  10. Hydropower Baseline Cost Modeling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.« less

  11. Hydropower Baseline Cost Modeling, Version 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Connor, Patrick W.

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gapsmore » in publically available hydropower cost estimating tools that can support the national-scale evaluation of hydropower resources.« less

  12. KSC-2010-4511

    NASA Image and Video Library

    2010-08-27

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, Director of the center's Constellation Project Office Pepper Phillips talks to workers at the Launch Equipment Test Facility (LETF), which recently underwent a $35 million comprehensive upgrade that lasted four years. The LETF was established in the 1970s to support the qualification of the Space Shuttle Program’s umbilical and T-0 mechanisms. Throughout the years, it has supported the development of systems for shuttle and the International Space Station, Delta and Atlas rockets, and various research and development programs. The LETF has unique capabilities to evolve into a versatile test and development area that supports a wide spectrum of programs. For information on NASA's future plans, visit www.nasa.gov. Photo credit: NASA/Dimitri Gerondidakis

  13. Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade

    NASA Astrophysics Data System (ADS)

    Conway, Z. A.; Barcikowski, A.; Cherry, G. L.; Fischer, R. L.; Fuerst, J. D.; Jansma, W. G.; Gerbick, S. M.; Kedzie, M. J.; Kelly, M. P.; Kim, S. H.; MacDonald, S. W. T.; Murphy, R. C.; Ostroumov, P. N.; Reid, T. C.; Shepard, K. W.

    2014-01-01

    The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.

  14. Scientific Design of the New Neutron Radiography Facility (SANRAD) at SAFARI-1 for South Africa

    NASA Astrophysics Data System (ADS)

    de Beer, F. C.; Gruenauer, F.; Radebe, J. M.; Modise, T.; Schillinger, B.

    The final scientific design for an upgraded neutron radiography/tomography facility at beam port no.2 of the SAFARI-1 nuclear research reactor has been performed through expert advice from Physics Consulting, FRMII in Germany and IPEN, Brazil. A need to upgrade the facility became apparent due to the identification of various deficiencies of the current SANRAD facility during an IAEA-sponsored expert mission of international scientists to Necsa, South Africa. A lack of adequate shielding that results in high neutron background on the beam port floor, a mismatch in the collimator aperture to the core that results in a high gradient in neutron flux on the imaging plane and due to a relative low L/D the quality of the radiographs are poor, are a number of deficiencies to name a few.The new design, based on results of Monte Carlo (MCNP-X) simulations of neutron- and gamma transport from the reactor core and through the new facility, is being outlined. The scientific design philosophy, neutron optics and imaging capabilities that include the utilization of fission neutrons, thermal neutrons, and gamma-rays emerging from the core of SAFARI-1 are discussed.

  15. Cutting Costs.

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2003-01-01

    Offers ten suggestions for schools and universities to maximize their budgets: energy upgrades, security technology, maintenance management systems, partnerships, modernized washrooms, windows, facilities assessment, outsourcing, alternative fuels, and building commissioning. (EV)

  16. UTILIZATION OF MOBILE FACILITIES FOR DEVELOPMENT OF ENTRY WORK SKILLS FOR ARKANSAS' RURAL UNEMPLOYED AND LOW INCOME EARNERS, A FEASIBILITY STUDY.

    ERIC Educational Resources Information Center

    Nevada Univ., Reno. School Planning Lab.

    THE FEASIBILITY AND METHODS OF USING MOBILE FACILITIES IN UPGRADING THE WORK SKILLS OF RURAL LOW INCOME WAGE EARNERS ARE EXPLORED. SUCH MOBILE FACILITIES WOULD BE DIRECTED TOWARD 3 SPECIFIC GROUPS OF PEOPLE--SMALL ACREAGE FARMERS WHO PRODUCED ONLY A MINIMAL INCOME, THE RURAL LOW-INCOME NEGRO POPULATION, AND YOUNG RURAL SCHOOL DROPOUTS WITH LITTLE…

  17. Paying for Itself

    ERIC Educational Resources Information Center

    Wilkinson, Ron

    2009-01-01

    Many schools and universities want the U.S. Green Building Council's LEED certification for their facilities, but they are concerned about cost. This certification is tangible evidence that a facility is designed to conserve resources and use energy more efficiently. "Low-cost/no-cost" upgrades can be worked into a capital plan that provides a 3-…

  18. 40 CFR 35.935-17 - Training facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...

  19. 40 CFR 35.935-17 - Training facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...

  20. Searching for Solutions. A Citizen's Guide to Hazardous Waste Management in Ohio.

    ERIC Educational Resources Information Center

    Clapham, Pete, Comp.

    This guide was developed to promote responsible hazardous waste management by Ohio citizens, citizens who are interested in upgrading operations of existing waste facilities, oppose the development of any new landfills, and those who promote the establishment of modern, efficient facilities. Information is presented in six chapters. The hazardous…

  1. Operating capability and current status of the reactivated NASA Lewis Research Center Hypersonic Tunnel Facility

    NASA Technical Reports Server (NTRS)

    Thomas, Scott R.; Trefny, Charles J.; Pack, William D.

    1995-01-01

    The NASA Lewis Research Center's Hypersonic Tunnel Facility (HTF) is a free-jet, blowdown propulsion test facility that can simulate up to Mach-7 flight conditions with true air composition. Mach-5, -6, and -7 nozzles, each with a 42 inch exit diameter, are available. Previously obtained calibration data indicate that the test flow uniformity of the HTF is good. The facility, without modifications, can accommodate models approximately 10 feet long. The test gas is heated using a graphite core induction heater that generates a nonvitiated flow. The combination of clean-air, large-scale, and Mach-7 capabilities is unique to the HTF and enables an accurate propulsion performance determination. The reactivation of the HTF, in progress since 1990, includes refurbishing the graphite heater, the steam generation plant, the gaseous oxygen system, and all control systems. All systems were checked out and recertified, and environmental systems were upgraded to meet current standards. The data systems were also upgraded to current standards and a communication link with NASA-wide computers was added. In May 1994, the reactivation was complete, and an integrated systems test was conducted to verify facility operability. This paper describes the reactivation, the facility status, the operating capabilities, and specific applications of the HTF.

  2. Experimental investigation of nozzle/plume aerodynamics at hypersonic speeds

    NASA Technical Reports Server (NTRS)

    Bogdanoff, David W.; Cambier, Jean-Luc; Papadopoulos, Perikles

    1994-01-01

    Much of the work involved the Ames 16-Inch Shock Tunnel facility. The facility was reactivated and upgraded, a data acquisition system was configured and upgraded several times, several facility calibrations were performed and test entries with a wedge model with hydrogen injection and a full scramjet combustor model, with hydrogen injection, were performed. Extensive CFD modeling of the flow in the facility was done. This includes modeling of the unsteady flow in the driver and driven tubes and steady flow modeling of the nozzle flow. Other modeling efforts include simulations of non-equilibrium flows and turbulence, plasmas, light gas guns and the use of non-ideal gas equations of state. New experimental techniques to improve the performance of gas guns, shock tubes and tunnels and scramjet combustors were conceived and studied computationally. Ways to improve scramjet engine performance using steady and pulsed detonation waves were also studied computationally. A number of studies were performed on the operation of the ram accelerator, including investigations of in-tube gasdynamic heating and the use of high explosives to raise the velocity capability of the device.

  3. The CERN-EU high-energy Reference Field (CERF) facility: applications and latest developments

    NASA Astrophysics Data System (ADS)

    Silari, Marco; Pozzi, Fabio

    2017-09-01

    The CERF facility at CERN provides an almost unique high-energy workplace reference radiation field for the calibration and test of radiation protection instrumentation employed at high-energy accelerator facilities and for aircraft and space dosimetry. This paper describes the main features of the facility and supplies a non-exhaustive list of recent (as of 2005) applications for which CERF is used. Upgrade work started in 2015 to provide the scientific and industrial communities with a state-of-the-art reference facility is also discussed.

  4. Future directions in high-pressure neutron diffraction

    NASA Astrophysics Data System (ADS)

    Guthrie, M.

    2015-04-01

    The ability to manipulate structure and properties using pressure has been well known for many centuries. Diffraction provides the unique ability to observe these structural changes in fine detail on lengthscales spanning atomic to nanometre dimensions. Amongst the broad suite of diffraction tools available today, neutrons provide unique capabilities of fundamental importance. However, to date, the growth of neutron diffraction under extremes of pressure has been limited by the weakness of available sources. In recent years, substantial government investments have led to the construction of a new generation of neutron sources while existing facilities have been revitalized by upgrades. The timely convergence of these bright facilities with new pressure-cell technologies suggests that the field of high-pressure (HP) neutron science is on the cusp of substantial growth. Here, the history of HP neutron research is examined with the hope of gleaning an accurate prediction of where some of these revolutionary capabilities will lead in the near future. In particular, a dramatic expansion of current pressure-temperature range is likely, with corresponding increased scope for extreme-conditions science with neutron diffraction. This increase in coverage will be matched with improvements in data quality. Furthermore, we can also expect broad new capabilities beyond diffraction, including in neutron imaging, small angle scattering and inelastic spectroscopy.

  5. Measurements and FLUKA Simulations of Bismuth, Aluminium and Indium Activation at the upgraded CERN Shielding Benchmark Facility (CSBF)

    NASA Astrophysics Data System (ADS)

    Iliopoulou, E.; Bamidis, P.; Brugger, M.; Froeschl, R.; Infantino, A.; Kajimoto, T.; Nakao, N.; Roesler, S.; Sanami, T.; Siountas, A.; Yashima, H.

    2018-06-01

    The CERN High energy AcceleRator Mixed field (CHARM) facility is situated in the CERN Proton Synchrotron (PS) East Experimental Area. The facility receives a pulsed proton beam from the CERN PS with a beam momentum of 24 GeV/c with 5·1011 protons per pulse with a pulse length of 350 ms and with a maximum average beam intensity of 6.7·1010 protons per second. The extracted proton beam impacts on a cylindrical copper target. The shielding of the CHARM facility includes the CERN Shielding Benchmark Facility (CSBF) situated laterally above the target that allows deep shielding penetration benchmark studies of various shielding materials. This facility has been significantly upgraded during the extended technical stop at the beginning of 2016. It consists now of 40 cm of cast iron shielding, a 200 cm long removable sample holder concrete block with 3 inserts for activation samples, a material test location that is used for the measurement of the attenuation length for different shielding materials as well as for sample activation at different thicknesses of the shielding materials. Activation samples of bismuth, aluminium and indium were placed in the CSBF in September 2016 to characterize the upgraded version of the CSBF. Monte Carlo simulations with the FLUKA code have been performed to estimate the specific production yields of bismuth isotopes (206 Bi, 205 Bi, 204 Bi, 203 Bi, 202 Bi, 201 Bi) from 209 Bi, 24 Na from 27 Al and 115 m I from 115 I for these samples. The production yields estimated by FLUKA Monte Carlo simulations are compared to the production yields obtained from γ-spectroscopy measurements of the samples taking the beam intensity profile into account. The agreement between FLUKA predictions and γ-spectroscopy measurements for the production yields is at a level of a factor of 2.

  6. Status of the ATF Damping Ring BPM Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Briegel, C.; /Fermilab; Eddy, N.

    2011-12-01

    A substantial upgrade of the beam position monitors (BPM) at the ATF (Accelerator Test Facility) damping ring is currently in progress. Implementing digital read-out signal processing techniques in line with an optimized, low-noise analog downconverter, a resolution well below 1 mum could be demonstrated at 20 (of 96) upgraded BPM stations. The narrowband, high resolution BPM mode permits investigation of all types of non-linearities, imperfections and other obstacles in the machine which may limit the very low target aimed vertical beam emittance of < 2 pm. The technical status of the project, first beam measurements and an outlook to it'smore » finalization are presented.« less

  7. The upgraded Large Plasma Device, a machine for studying frontier basic plasma physics.

    PubMed

    Gekelman, W; Pribyl, P; Lucky, Z; Drandell, M; Leneman, D; Maggs, J; Vincena, S; Van Compernolle, B; Tripathi, S K P; Morales, G; Carter, T A; Wang, Y; DeHaas, T

    2016-02-01

    In 1991 a manuscript describing an instrument for studying magnetized plasmas was published in this journal. The Large Plasma Device (LAPD) was upgraded in 2001 and has become a national user facility for the study of basic plasma physics. The upgrade as well as diagnostics introduced since then has significantly changed the capabilities of the device. All references to the machine still quote the original RSI paper, which at this time is not appropriate. In this work, the properties of the updated LAPD are presented. The strategy of the machine construction, the available diagnostics, the parameters available for experiments, as well as illustrations of several experiments are presented here.

  8. A sustainable approach to empower the bio-based future: upgrading of biomass via process intensification

    EPA Science Inventory

    An economically viable and environmentally benign continuous flow intensified process has been developed to demonstrate the ability to upgrade biomass into potential biofuels, solvents, and pharmaceutical feedstocks using a bimetallic AgPd@g-C3N4 catalyst.

  9. The Pegasus-Upgrade Experiment

    NASA Astrophysics Data System (ADS)

    Fonck, R. J.; Bongard, M. W.; Barr, J. L.; Frerichs, H. G.; Lewicki, B. T.; Reusch, J. A.; Schmitz, O.; Winz, G. R.

    2015-11-01

    Tokamak operation at near-unity aspect ratio provides access to advanced tokamak physics at modest parameters. High plasma current is accessible at very low toroidal field. This offers H-mode performance at Te levels that allow use of electrostatic and magnetic probe arrays through the edge pedestal region into the plasma core. An upgrade to the Pegasus ST is planned to exploit these features and pursue unique studies in three areas: local measurements of pedestal and ELM dynamics at Alfvenic timescales; direct measurement of the local plasma response to application of 3D magnetic perturbations with high spectral flexibility; and extension of Local Helicity Injection for nonsolenoidal startup to NSTX-U-relevant confinement and stability regimes. Significant but relatively low-cost upgrades to the facility are proposed: a new centerstack with larger solenoid and 2x the number of toroidal field conductors; a new TF power supply and conversion of the 200 MVA OH power supply to a cascaded multilevel inverter configuration; and installation of an extensive 3D-magnetic perturbation coil system for ELM mitigation and suppression studies. The upgraded facility will provide 0.3 MA plasmas with pulse lengths of 50-100 msec flattop, aspect ratio <1.25, and toroidal field up to 0.4 T. These research activities will be integrated into related efforts on DIII-D and NSTX-U. Work supported by US DOE grant DE-FG02-96ER54375.

  10. Human space flight and future major space astrophysics missions: servicing and assembly

    NASA Astrophysics Data System (ADS)

    Thronson, Harley; Peterson, Bradley M.; Greenhouse, Matthew; MacEwen, Howard; Mukherjee, Rudranarayan; Polidan, Ronald; Reed, Benjamin; Siegler, Nicholas; Smith, Hsiao

    2017-09-01

    Some concepts for candidate future "flagship" space observatories approach the payload limits of the largest launch vehicles planned for the next few decades, specifically in the available volume in the vehicle fairing. This indicates that an alternative to autonomous self-deployment similar to that of the James Webb Space Telescope will eventually be required. Moreover, even before this size limit is reached, there will be significant motivation to service, repair, and upgrade in-space missions of all sizes, whether to extend the life of expensive facilities or to replace outworn or obsolete onboard systems as was demonstrated so effectively by the Hubble Space Telescope program. In parallel with these challenges to future major space astronomy missions, the capabilities of in-space robotic systems and the goals for human space flight in the 2020s and 2030s offer opportunities for achieving the most exciting science goals of the early 21st Century. In this paper, we summarize the history of concepts for human operations beyond the immediate vicinity of the Earth, the importance of very large apertures for scientific discovery, and current capabilities and future developments in robot- and astronaut-enabled servicing and assembly.

  11. 40 CFR 35.2152 - Federal share.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...

  12. 40 CFR 35.2152 - Federal share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...

  13. Developments towards the LHCb VELO upgrade

    NASA Astrophysics Data System (ADS)

    Cid Vidal, Xabier

    2016-09-01

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019-2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb-1. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign.

  14. Calibration techniques and strategies for the present and future LHC electromagnetic calorimeters

    NASA Astrophysics Data System (ADS)

    Aleksa, M.

    2018-02-01

    This document describes the different calibration strategies and techniques applied by the two general purpose experiments at the LHC, ATLAS and CMS, and discusses them underlining their respective strengths and weaknesses from the view of the author. The resulting performances of both calorimeters are described and compared on the basis of selected physics results. Future upgrade plans for High Luminosity LHC (HL-LHC) are briefly introduced and planned calibration strategies for the upgraded detectors are shown.

  15. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Phase II Upgrade Activities

    NASA Technical Reports Server (NTRS)

    Emrich, William J.; Moran, Robert P.; Pearson, J. Bose

    2013-01-01

    To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities. Keywords: Nuclear Thermal Propulsion, Simulator

  16. NETL- Severe Environment Corrosion Erosion Facility

    ScienceCinema

    None

    2018-01-16

    NETL's Severe Environment Corrosion Erosion Facility in Albany studies how new and old materials will stand up to new operating conditions. Work done in the lab supports NETL's oxy-fuel combustion oxidation work, refractory materials stability work, and the fuels program, in particular the hydrogen membrane materials stability work, to determine how best to upgrade existing power plants.

  17. Design Principles of an Open Agent Architecture for Web-Based Learning Community.

    ERIC Educational Resources Information Center

    Jin, Qun; Ma, Jianhua; Huang, Runhe; Shih, Timothy K.

    A Web-based learning community involves much more than putting learning materials into a Web site. It can be seen as a complex virtual organization involved with people, facilities, and cyber-environment. Tremendous work and manpower for maintaining, upgrading, and managing facilities and the cyber-environment are required. There is presented an…

  18. Will there be energy frontier colliders after LHC?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shiltsev, Vladimir

    2016-09-15

    High energy particle colliders have been in the forefront of particle physics for more than three decades. At present the near term US, European and international strategies of the particle physics community are centered on full exploitation of the physics potential of the Large Hadron Collider (LHC) through its high-luminosity upgrade (HL-LHC). The future of the world-wide HEP community critically depends on the feasibility of possible post-LHC colliders. The concept of the feasibility is complex and includes at least three factors: feasibility of energy, feasibility of luminosity and feasibility of cost. Here we overview all current options for post-LHC collidersmore » from such perspective (ILC, CLIC, Muon Collider, plasma colliders, CEPC, FCC, HE-LHC) and discuss major challenges and accelerator R&D required to demonstrate feasibility of an energy frontier accelerator facility following the LHC. We conclude by taking a look into ultimate energy reach accelerators based on plasmas and crystals, and discussion on the perspectives for the far future of the accelerator-based particle physics.« less

  19. US-CERT Control System Center Input/Output (I/O) Conceputal Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2005-02-01

    This document was prepared for the US-CERT Control Systems Center of the National Cyber Security Division (NCSD) of the Department of Homeland Security (DHS). DHS has been tasked under the Homeland Security Act of 2002 to coordinate the overall national effort to enhance the protection of the national critical infrastructure. Homeland Security Presidential Directive HSPD-7 directs the federal departments to identify and prioritize critical infrastructure and protect it from terrorist attack. The US-CERT National Strategy for Control Systems Security was prepared by the NCSD to address the control system security component addressed in the National Strategy to Secure Cyberspace andmore » the National Strategy for the Physical Protection of Critical Infrastructures and Key Assets. The US-CERT National Strategy for Control Systems Security identified five high-level strategic goals for improving cyber security of control systems; the I/O upgrade described in this document supports these goals. The vulnerability assessment Test Bed, located in the Information Operations Research Center (IORC) facility at Idaho National Laboratory (INL), consists of a cyber test facility integrated with multiple test beds that simulate the nation's critical infrastructure. The fundamental mission of the Test Bed is to provide industry owner/operators, system vendors, and multi-agency partners of the INL National Security Division a platform for vulnerability assessments of control systems. The Input/Output (I/O) upgrade to the Test Bed (see Work Package 3.1 of the FY-05 Annual Work Plan) will provide for the expansion of assessment capabilities within the IORC facility. It will also provide capabilities to connect test beds within the Test Range and other Laboratory resources. This will allow real time I/O data input and communication channels for full replications of control systems (Process Control Systems [PCS], Supervisory Control and Data Acquisition Systems [SCADA], and components). This will be accomplished through the design and implementation of a modular infrastructure of control system, communications, networking, computing and associated equipment, and measurement/control devices. The architecture upgrade will provide a flexible patching system providing a quick ''plug and play''configuration through various communication paths to gain access to live I/O running over specific protocols. This will allow for in-depth assessments of control systems in a true-to-life environment. The full I/O upgrade will be completed through a two-phased approach. Phase I, funded by DHS, expands the capabilities of the Test Bed by developing an operational control system in two functional areas, the Science & Technology Applications Research (STAR) Facility and the expansion of various portions of the Test Bed. Phase II (see Appendix A), funded by other programs, will complete the full I/O upgrade to the facility.« less

  20. 7 CFR 1740.6 - Eligible purposes of grants.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., translators, and repeaters, including all facilities required to initiate DTV broadcasting. All broadcast... transmitters or translators that may be included in an application; (b) Power upgrades of existing DTV...

  1. Recent Results from ISOLDE and HIE-ISOLDE

    NASA Astrophysics Data System (ADS)

    Borge, María J. G.

    2018-02-01

    ISOLDE is the CERN facility dedicated to the production of rare ion beams for many different experiments in the fields of nuclear and atomic physics, materials science and life sciences. The HIE-ISOLDE, Higher Intensity and Energy upgrade has finished its stage 1 dedicated to upgrade the energy up to 5.5 MeV/u, producing the first radioactive beams with this energy in September 9th 2016. Recent results from the low energy and post-accelerated beams are given in this contribution.

  2. Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

    NASA Technical Reports Server (NTRS)

    Kotegawa, Tatsuya; Cayabyab, Charlene Anne; Almog, Noam

    2013-01-01

    Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

  3. KSC-00padig019

    NASA Image and Video Library

    2000-05-02

    Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park

  4. KSC00padig019

    NASA Image and Video Library

    2000-05-02

    Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park

  5. Future of ePix detectors for high repetition rate FELs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Blaj, G., E-mail: blaj@slac.stanford.edu; Caragiulo, P.; Carini, G.

    2016-07-27

    Free-electron lasers (FELs) made the imaging of atoms and molecules in motion possible, opening new science opportunities with high brilliance, ultra-short x-ray laser pulses at up to 120 Hz. Some new or upgraded FEL facilities will operate at greatly increased pulse rates (kHz to MHz), presenting additional requirements on detection. We will present the ePix platform for x-ray detectors and the current status of the ePix detectors: ePix100 for low noise applications, ePix10k for high dynamic range applications, and ePixS for spectroscopic applications. Then we will introduce the plans to match the ePix detectors with the requirements of currently plannedmore » high repetition rate FELs (mainly readout speed and energy range).« less

  6. The Maunakea Spectroscopic ExplorerStatus and System overview

    NASA Astrophysics Data System (ADS)

    Mignot, S.; Murowinski, R.; Szeto, K.; Blin, A.; Caillier, P.

    2017-12-01

    The Maunakea Spectroscopic Explorer (MSE) project explores the possibility of upgrading the existing CFHT telescope and collaboration to turn it into the most powerful spectroscopic facility available in the years 2020s. Its 10 meter aperture and its 1.5°² hexagonal field of view will allow both large and deep surveys, as complements to current (Gaia, eRosita, LOFAR) and future imaging (Euclid, WFIRST, SKA, LSST) surveys, but also to provide tentative targets to the TMT or the E-ELT. In perfect agreement with INSU's 2015-2020 prospective, besides being well represented in MSE's science team (23/105 members), France is also a major contributor to the Conceptual Design studies with CRAL developing a concept for the low and moderate spectrographs, DT INSU for the prime focus environment and GEPI for systems engineering.

  7. Department of Energy Arm Facilities on the North Slope of Alaska and Plans for a North Slope "Mega-Site"

    NASA Astrophysics Data System (ADS)

    Ivey, M.; Verlinde, J.

    2014-12-01

    The U.S. Department of Energy (DOE), through its scientific user facility, the Atmospheric Radiation Measurement (ARM) Climate Research Facility, provides scientific infrastructure and data to the international Arctic research community via its research sites located on the North Slope of Alaska. The DOE ARM Program has operated an atmospheric measurement facility in Barrow, Alaska, since 1998. Major upgrades to this facility, including scanning radars, were added in 2010. Facilities and infrastructure to support operations of unmanned aerial systems for science missions in the Arctic and North Slope of Alaska were established at Oliktok Point Alaska in 2013. Tethered instrumented balloons will be used in the near future to make measurements of clouds in the boundary layer including mixed-phase clouds. The Atmospheric Radiation Measurement (ARM) Climate Research Facility is implementing "mega-sites" at the Southern Great Plains and North Slope of Alaska sites. Two workshops were held to gather input from the scientific community on these mega-sites. The NSA workshop was held September 10 and 11 in the Washington DC area. The workshops included discussions of additional profiling remote sensors, detailed measurements of the land-atmosphere interface, aerial operations to link the Barrow and Oliktok sites, unmanned aerial system measurements, and routine large eddy simulation model runs. The "mega-sites" represent a significant new scientific and infrastructure investment by DOE Office of Science, Office of Biological and Environmental Research. This poster will present information on plans for a North Slope "Megasite" as well as new opportunities for members of the arctic research community to make atmospheric measurements using unmanned aerial systems or tethered balloons in conjunction with the DOE ARM facilities on the North Slope of Alaska.

  8. Determination of gross alpha and gross beta in soil around repository facility at Bukit Kledang, Perak, Malaysia

    NASA Astrophysics Data System (ADS)

    Adziz, Mohd Izwan Abdul; Siong, Khoo Kok

    2018-04-01

    Recently, the Long Term Storage Facility (LTSF) in Bukit Kledang, Perak, Malaysia, has been upgraded to repository facility upon the completion of decontamination and decommissioning (D&D) process. Thorium waste and contaminated material that may contain some minor amounts of thorium hydroxide were disposed in this facility. This study is conducted to determine the concentrations of gross alpha and gross beta radioactivities in soil samples collected around the repository facility. A total of 12 soil samples were collected consisting 10 samples from around the facility and 2 samples from selected residential area near the facility. In addition, the respective dose rates were measured 5 cm and 1 m above the ground by using survey meter with Geiger Muller (GM) detector and Sodium Iodide (NaI) detector. Soil samples were collected using hand auger and then were taken back to the laboratory for further analysis. Samples were cleaned, dried, pulverized and sieved prior to analysis. Gross alpha and gross beta activity measurements were carried out using gas flow proportional counter, Canberra Series 5 XLB - Automatic Low Background Alpha and Beta Counting System. The obtained results show that, the gross alpha and gross beta activity concentration ranged from 1.55 to 5.34 Bq/g with a mean value of 3.47 ± 0.09 Bq/g and 1.64 to 5.78 Bq/g with a mean value of 3.49 ± 0.09 Bq/g, respectively. These results can be used as an additional data to represent terrestrial radioactivity baseline data for Malaysia environment. This estimation will also serve as baseline for detection of any future related activities of contamination especially around the repository facility area.

  9. Energy Efficiency Through Lighting Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berst, Kara; Howeth, Maria

    2013-02-26

    Lighting upgrades including neon to LED, incandescent to CFL's and T-12 to T-8 and T-5's were completed through this grant. A total of 16 Chickasaw nation facilities decreased their carbon footprint because of these grant funds. Calculations used were based on comparing the energy usage from the previous year's average and the current energy usage. For facilities without a full year's set of energy bills, the month after installation was compared to the same month from the previous year. Overall, the effect the lighting change-outs had for the gaming centers and casinos far exceeded expectations. For the Madill Gaming Center;more » both an interior and exterior upgrade was performed which resulted in a 31% decrease in energy consumption. This same reduction was seen in every facility that participated in the grant. Just by simply changing out light bulbs to newer energy efficient equivalents, a decrease in energy usage can be achieved and this was validated by the return on investment seen at Chickasaw Nation facilities. Along with the technical project tasks were awareness sessions presented at Chickasaw Head Starts. The positive message of environmental stewardship was passed down to head start students and passed along to Chickasaw employees. Excitement was created in those that learned what they could do to help reduce their energy bills and many followed through and took the idea home. For a fairy low cost, the general public can also use this technique to lower their energy consumption both at home and at work. Although the idea behind the project was somewhat simple, true benefits have been gained through environmental awareness and reductions of energy costs.« less

  10. The Central Laser Facility at the Pierre Auger Observatory: Studies of the Atmospheric Vertical Aerosol Optical Depth and other Applications to Cosmic Ray Measurements

    NASA Astrophysics Data System (ADS)

    Medina Hernandez, Carlos Francisco

    The two largest observatories in the world dedicated to the study of Ultra High Energy Cosmic Rays (UHECR) are the Pierre Auger Observatory (Auger) in Mendoza, Argentina and the Telescope Array (TA) in Utah, USA. The measurements of the cosmic ray flux by Auger and TA present a discrepancy at the highest part of the energy spectrum. In this thesis, I study if this discrepancy can be attributed to instrumental effects related to the measurements of the atmospheric aerosol contents in Auger. The Auger Fluorescence Detector (FD) measures the scattered light from laser tracks generated by the Central Laser Facility (CLF) and the eXtreme Laser Facility (XLF) located near the center of Auger, to estimate the vertical aerosol optical depth (tau (z,t)). A good knowledge of tau (z,t) is needed to obtain unbiased and reliable FD measurements of the energy of the UHECR primary particle. The CLF was upgraded substantially in 2013 to improve laser reliability. A substantial part of my Ph.D work is dedicated to building, maintaining and analyzing data from this upgraded facility. The upgraded CLF includes a backscatter Raman LIDAR which independently measures tau (z,t). For the first time in a cosmic ray experiment, two years of measurements of tau (z,t) obtained with the Raman LIDAR are compared with the measurements obtained with the FD. Based on these comparisons, an alternative atmospheric database was created to study its effects on the measurements of the flux as a function of energy. The resulting energy spectrum plot is found to be more compatible with the energy spectrum plot released by TA.

  11. Challenges faced in e-infrastructure at the Ministry of Mines and Energy, Namibia

    NASA Astrophysics Data System (ADS)

    Maletzky, Monica; Mhopjeni, Kombada

    2014-05-01

    The e-infrastructure at the Ministry of Mines is undergoing considerable restructuring with most of it in the planning phase. One of the main challenges faced is the Local Area Network that is outdated and not capable to handling the volume of data that is transferred in the network. Most of the Network Interface Cards (NIC) on the servers and all related LAN equipment have a capability of 10/100Mb/s and cannot support the volume of data transported over the network. This is not adequate for the need of high end users such as geoscientists who work with large geological, remote sensing and geophysical datasets. Taking the above into consideration the Ministry has embarked on implementing changes to the network. The initiative involves the acquisition of Cisco Layer3 switches that have the capability of transferring large volumes of data, up to 10Gb/s. Subsequent upgrades of the NICs and small form-factor pluggable (SFP) are planned in the near future. Apart from the internal network, the Ministry's present internet connection is insufficient as the Ministry shares the outbound link with all other Ministries in the Namibian government. The internet provided by the Office of the Prime Minister (OPM), which serves as the government's internet service provider (ISP), to our institution is currently 2Mb/s. OPM has embarked on the upgrade of the network infrastructure. The first phase of the involved the upgrade of the national point of presence (POP) to operate at a capacity of 300Mb/s. This would be followed by the expansion of a fibre network to all the government institutions. Upon completion, the internet performance will be improved as it is envisaged that the Ministry of Mines and Energy's bandwidth will be upgraded to 10Mb/s and hopefully alleviate the current strain on the system. This project is expected to be completed by June 2014. However, due to the challenges that our office is faced with, we have acquired a 4Mb/s internet link for the interim period. Storage also poses one of our main challenges. The institution lacks sufficient storage and at present some data are stored externally. Similarly, the back-up storage is limited and outdated, as in some instances storage tapes are used. The Ministry plans to acquire a new storage capacity to enable it to locally host all the data. Subsequently this new storage facility will include back-up storage hosted off-site. The acquisition is in progress and the implementation of the new system is envisaged within the near future. The Ministry is trying its utmost to upgrade its e-infrastructure to support the business of the organisation.

  12. Integrated Disposal Facility FY 2012 Glass Testing Summary Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pierce, Eric M.; Kerisit, Sebastien N.; Krogstad, Eirik J.

    2013-03-29

    PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Keymore » activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.« less

  13. Infrastructure optimisation via MBR retrofit: a design guide.

    PubMed

    Bagg, W K

    2009-01-01

    Wastewater management is continually evolving with the development and implementation of new, more efficient technologies. One of these is the Membrane Bioreactor (MBR). Although a relatively new technology in Australia, MBR wastewater treatment has been widely used elsewhere for over 20 years, with thousands of MBRs now in operation worldwide. Over the past 5 years, MBR technology has been enthusiastically embraced in Australia as a potential treatment upgrade option, and via retrofit typically offers two major benefits: (1) more capacity using mostly existing facilities, and (2) very high quality treated effluent. However, infrastructure optimisation via MBR retrofit is not a simple or low-cost solution and there are many factors which should be carefully evaluated before deciding on this method of plant upgrade. The paper reviews a range of design parameters which should be carefully evaluated when considering an MBR retrofit solution. Several actual and conceptual case studies are considered to demonstrate both advantages and disadvantages. Whilst optimising existing facilities and production of high quality water for reuse are powerful drivers, it is suggested that MBRs are perhaps not always the most sustainable Whole-of-Life solution for a wastewater treatment plant upgrade, especially by way of a retrofit.

  14. Tritium Plasma Experiment Upgrade and Improvement of Surface Diagnostic Capabilities at STAR Facility for Enhancing Tritium and Nuclear PMI Sciences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shimada, M.; Taylor, C. N.; Pawelko, R. J.

    2016-04-01

    The Tritium Plasma Experiment (TPE) is a unique high-flux linear plasma device that can handle beryllium, tritium, and neutron-irradiated plasma facing materials, and is the only existing device dedicated to directly study tritium retention and permeation in neutron-irradiated materials with tritium [M. Shimada et.al., Rev. Sci. Instru. 82 (2011) 083503 and and M. Shimada, et.al., Nucl. Fusion 55 (2015) 013008]. The plasma-material-interaction (PMI) determines a boundary condition for diffusing tritium into bulk PFCs, and the tritium PMI is crucial for enhancing fundamental sciences that dictate tritium fuel cycles and safety and are high importance to an FNSF and DEMO. Recentlymore » the TPE has undergone major upgrades in its electrical and control systems. New DC power supplies and a new control center enable remote plasma operations from outside of the contamination area for tritium, minimizing the possible exposure risk with tritium and beryllium. We discuss the electrical upgrade, enhanced operational safety, improved plasma performance, and development of optical spectrometer system. This upgrade not only improves operational safety of the worker, but also enhances plasma performance to better simulate extreme plasma-material conditions expected in ITER, Fusion Nuclear Science Facility (FNSF), and Demonstration reactor (DEMO). This work was prepared for the U.S. Department of Energy, Office of Fusion Energy Sciences, under the DOE Idaho Field Office contract number DE-AC07-05ID14517.« less

  15. Making a Splash.

    ERIC Educational Resources Information Center

    Ephron, Hazel; Bishop, Walter

    2001-01-01

    Explains why upgrading a school's pools can help reduce maintenance costs and make safer facilities. Three top engineering issues in older pools are addressed: recirculation, filtration, and dehumidification. Concluding comments discuss procedures for establishing safe swimming. (GR)

  16. The Telecommunications and Data Aquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Tracking and ground-based navigation techniques are discussed in relation to DSN advanced systems. Network data processing and productivity are studied to improve management planning methods. Project activities for upgrading DSN facilities are presented.

  17. MSE observatory: a revised and optimized astronomical facility

    NASA Astrophysics Data System (ADS)

    Bauman, Steven E.; Angers, Mathieu; Benedict, Tom; Crampton, David; Flagey, Nicolas; Gedig, Mike; Green, Greg; Liu, Andy; Lo, David; Loewen, Nathan; McConnachie, Alan; Murowinski, Rick; Racine, René; Salmon, Derrick; Stiemer, Siegfried; Szeto, Kei; Wu, Di

    2016-07-01

    The Canada-France-Hawaii-Telescope Corporation (CFHT) plans to repurpose its observatory on the summit of Maunakea and operate a (60 segment) 11.25m aperture wide field spectroscopic survey telescope, the Maunakea Spectroscopic Explorer (MSE). The prime focus telescope will be equipped with dedicated instrumentation to take advantage of one of the best sites in the northern hemisphere and offer its users the ability to perform large surveys. Central themes of the development plan are reusing and upgrading wherever possible. MSE will reuse the CFHT site and build upon the existing observatory infrastructure, using the same building and telescope pier as CFHT, while minimizing environmental impact on the summit. MSE will require structural support upgrades to the building to meet the latest building seismic code requirements and accommodate a new larger telescope and upgraded enclosure. It will be necessary to replace the current dome since a larger slit opening is needed for a larger telescope. MSE will use a thermal management system to remove heat generated by loads from the building, flush excess heat from lower levels, and maintain the observing environment temperature. This paper describes the design approach for redeveloping the CFHT facility for MSE. Once the project is completed the new facility will be almost indistinguishable on the outside from the current CFHT observatory. Past experience and lessons learned from CFHT staff and the astronomical community will be used to create a modern, optimized, and transformative scientific data collecting machine.

  18. Space Station Upgrades Continue on This Week @NASA – March 31, 2017

    NASA Image and Video Library

    2017-03-31

    Work continues aboard the International Space Station on upgrades to prepare it for future operational activities. Ground controllers, using the station’s robotic arm, moved the Pressurized Mating Adapter-3 (PMA-3) from the Tranquility module to the station’s Harmony module March 26. PMA-3 will be outfitted with one of two International Docking Adapters to accommodate U.S. commercial spacecraft carrying astronauts on future missions. Four days after the PMA-3 move, NASA’s Shane Kimbrough and Peggy Whitson conducted the second in a series of three planned spacewalks to complete work related to the upgrades. The third spacewalk is planned in April. Also, James Webb Space Telescope Completes Acoustic and Vibration Tests, MAVEN Data Helps Measure Loss of Mars’ Atmosphere, Getting Excited About STEM, and New NASA App for Amazon Fire TV!

  19. CO2 evaporative cooling: The future for tracking detector thermal management

    NASA Astrophysics Data System (ADS)

    Tropea, P.; Daguin, J.; Petagna, P.; Postema, H.; Verlaat, B.; Zwalinski, L.

    2016-07-01

    In the last few years, CO2 evaporative cooling has been one of the favourite technologies chosen for the thermal management of tracking detectors at LHC. ATLAS Insertable B-Layer and CMS Pixel phase 1 upgrade have adopted it and their systems are now operational or under commissioning. The CERN PH-DT team is now merging the lessons learnt on these two systems in order to prepare the design and construction of the cooling systems for the new Upstream Tracker and the Velo upgrade in LHCb, due by 2018. Meanwhile, the preliminary design of the ATLAS and CMS full tracker upgrades is started, and both concepts heavily rely on CO2 evaporative cooling. This paper highlights the performances of the systems now in operation and the challenges to overcome in order to scale them up to the requirements of the future generations of trackers. In particular, it focuses on the conceptual design of a new cooling system suited for the large phase 2 upgrade programmes, which will be validated with the construction of a common prototype in the next years.

  20. HIGH ENERGY, HIGH BRIGHTNESS X-RAYS PRODUCED BY COMPTON BACKSCATTERING AT THE LIVERMORE PLEIADES FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tremaine, A M; Anderson, S G; Betts, S

    2005-05-19

    PLEIADES (Picosecond Laser Electron Interaction for the Dynamic Evaluation of Structures) produces tunable 30-140 keV x-rays with 0.3-5 ps pulse lengths and up to 10{sup 7} photons/pulse by colliding a high brightness electron beam with a high power laser. The electron beam is created by an rf photo-injector system, accelerated by a 120 MeV linac, and focused to 20 {micro}m with novel permanent magnet quadrupoles. To produce Compton back scattered x-rays, the electron bunch is overlapped with a Ti:Sapphire laser that delivers 500 mJ, 100 fs, pulses to the interaction point. K-edge radiography at 115 keV on Uranium has verifiedmore » the angle correlated energy spectrum inherent in Compton scattering and high-energy tunability of the Livermore source. Current upgrades to the facility will allow laser pumping of targets synchronized to the x-ray source enabling dynamic diffraction and time-resolved studies of high Z materials. Near future plans include extending the radiation energies to >400 keV, allowing for nuclear fluorescence studies of materials.« less

  1. The Development and Implementation of a Cryogenic Pressure Sensitive Paint System in the National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Watkins, A. Neal; Leighty, Bradley D.; Lipford, William E.; Oglesby, Donald M.; Goodman, Kyle Z.; Goad, William K.; Goad, Linda R.; Massey, Edward A.

    2009-01-01

    The Pressure Sensitive Paint (PSP) method was used to measure global surface pressures on a model at full-scale flight Reynolds numbers. In order to achieve these conditions, the test was carried out at the National Transonic Facility (NTF) operating under cryogenic conditions in a nitrogen environment. The upper surface of a wing on a full-span 0.027 scale commercial transport was painted with a porous PSP formulation and tested at 120K. Data was acquired at Mach 0.8 with a total pressure of 200 kPa, resulting in a Reynolds number of 65 x 106/m. Oxygen, which is required for PSP operation, was injected using dry air so that the oxygen concentration in the flow was approximately 1535 ppm. Results show qualitative agreement with expected results. This preliminary test is the first time that PSP has been successfully deployed to measure global surface pressures at cryogenic condition in the NTF. This paper will describe the system as installed, the results obtained from the test, as well as proposed upgrades and future tests.

  2. STARDUST-U experiments on fluid-dynamic conditions affecting dust mobilization during LOVAs

    NASA Astrophysics Data System (ADS)

    Poggi, L. A.; Malizia, A.; Ciparisse, J. F.; Tieri, F.; Gelfusa, M.; Murari, A.; Del Papa, C.; Giovannangeli, I.; Gaudio, P.

    2016-07-01

    Since 2006 the Quantum Electronics and Plasma Physics (QEP) Research Group together with ENEA FusTech of Frascati have been working on dust re-suspension inside tokamaks and its potential capability to jeopardize the integrity of future fusion nuclear plants (i.e. ITER or DEMO) and to be a risk for the health of the operators. Actually, this team is working with the improved version of the "STARDUST" facility, i.e. "STARDUST-Upgrade". STARDUST-U facility has four new air inlet ports that allow the experimental replication of Loss of Vacuum Accidents (LOVAs). The experimental campaign to detect the different pressurization rates, local air velocity, temperature, have been carried out from all the ports in different accident conditions and the principal results will be analyzed and compared with the numerical simulations obtained through a CFD (Computational Fluid Dynamic) code. This preliminary thermo fluid-dynamic analysis of the accident is crucial for numerical model development and validation, and for the incoming experimental campaign of dust resuspension inside STARDUST-U due to well-defined accidents presented in this paper.

  3. The continued development of the Spallation Neutron Source external antenna H- ion sourcea)

    NASA Astrophysics Data System (ADS)

    Welton, R. F.; Carmichael, J.; Desai, N. J.; Fuga, R.; Goulding, R. H.; Han, B.; Kang, Y.; Lee, S. W.; Murray, S. N.; Pennisi, T.; Potter, K. G.; Santana, M.; Stockli, M. P.

    2010-02-01

    The U.S. Spallation Neutron Source (SNS) is an accelerator-based, pulsed neutron-scattering facility, currently in the process of ramping up neutron production. In order to ensure that the SNS will meet its operational commitments as well as provide for future facility upgrades with high reliability, we are developing a rf-driven, H- ion source based on a water-cooled, ceramic aluminum nitride (AlN) plasma chamber. To date, early versions of this source have delivered up to 42 mA to the SNS front end and unanalyzed beam currents up to ˜100 mA (60 Hz, 1 ms) to the ion source test stand. This source was operated on the SNS accelerator from February to April 2009 and produced ˜35 mA (beam current required by the ramp up plan) with availability of ˜97%. During this run several ion source failures identified reliability issues, which must be addressed before the source re-enters production: plasma ignition, antenna lifetime, magnet cooling, and cooling jacket integrity. This report discusses these issues, details proposed engineering solutions, and notes progress to date.

  4. Research and the planned Space Experiment Research and Processing Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Researchers perform tests at Kennedy Space Center. New facilities for such research will be provided at the Space Experiment Research Procession Laboratory (SERPL). The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.

  5. Control System Upgrade for a Mass Property Measurement Facility

    NASA Technical Reports Server (NTRS)

    Chambers, William; Hinkle, R. Kenneth (Technical Monitor)

    2002-01-01

    The Mass Property Measurement Facility (MPMF) at the Goddard Space Flight Center has undergone modifications to ensure the safety of Flight Payloads and the measurement facility. The MPMF has been technically updated to improve reliability and increase the accuracy of the measurements. Modifications include the replacement of outdated electronics with a computer based software control system, the addition of a secondary gas supply in case of a catastrophic failure to the gas supply and a motor controlled emergency stopping feature instead of a hard stop.

  6. 75 FR 60093 - Record of Decision for the United States Marine Corps Basewide Utilities Infrastructure Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... construction, operation, and maintenance of utility infrastructure upgrades, expansions, and improvements... and wastewater facilities and road improvements to Range 130. All practical means to avoid or minimize...

  7. Neutron Radiography and Computed Tomography at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Raine, Dudley A. III; Hubbard, Camden R.; Whaley, Paul M.

    1997-12-31

    The capability to perform neutron radiography and computed tomography is being developed at Oak Ridge National Laboratory. The facility will be located at the High Flux Isotope Reactor (HFIR), which has the highest steady state neutron flux of any reactor in the world. The Monte Carlo N-Particle transport code (MCNP), versions 4A and 4B, has been used extensively in the design phase of the facility to predict and optimize the operating characteristics, and to ensure the safety of personnel working in and around the blockhouse. Neutrons are quite penetrating in most engineering materials and can be useful to detect internalmore » flaws and features. Hydrogen atoms, such as in a hydrocarbon fuel, lubricant or a metal hydride, are relatively opaque to neutron transmission. Thus, neutron based tomography or radiography is ideal to image their presence. The source flux also provides unparalleled flexibility for future upgrades, including real time radiography where dynamic processes can be observed. A novel tomography detector has been designed using optical fibers and digital technology to provide a large dynamic range for reconstructions. Film radiography is also available for high resolution imaging applications. This paper summarizes the results of the design phase of this facility and the potential benefits to science and industry.« less

  8. 1994 Activity Report, National Synchrotron Light Source. Annual report, October 1, 1993-September 30, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rothman, E.Z.

    1995-05-01

    This report is a summary of activities carried out at the National Synchrotron Light Source during 1994. It consists of sections which summarize the work carried out in differing scientific disciplines, meetings and workshops, operations experience of the facility, projects undertaken for upgrades, administrative reports, and collections of abstracts and publications generated from work done at the facility.

  9. Simulation models and designs for advanced Fischer-Tropsch technology

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Choi, G.N.; Kramer, S.J.; Tam, S.S.

    1995-12-31

    Process designs and economics were developed for three grass-roots indirect Fischer-Tropsch coal liquefaction facilities. A baseline and an alternate upgrading design were developed for a mine-mouth plant located in southern Illinois using Illinois No. 6 coal, and one for a mine-mouth plane located in Wyoming using Power River Basin coal. The alternate design used close-coupled ZSM-5 reactors to upgrade the vapor stream leaving the Fischer-Tropsch reactor. ASPEN process simulation models were developed for all three designs. These results have been reported previously. In this study, the ASPEN process simulation model was enhanced to improve the vapor/liquid equilibrium calculations for themore » products leaving the slurry bed Fischer-Tropsch reactors. This significantly improved the predictions for the alternate ZSM-5 upgrading design. Another model was developed for the Wyoming coal case using ZSM-5 upgrading of the Fischer-Tropsch reactor vapors. To date, this is the best indirect coal liquefaction case. Sensitivity studies showed that additional cost reductions are possible.« less

  10. Pixel sensors with slim edges and small pitches for the CMS upgrades for HL-LHC

    DOE PAGES

    Vernieri, Caterina; Bolla, Gino; Rivera, Ryan; ...

    2016-06-07

    Here, planar n-in-n silicon detectors with small pitches and slim edges are being investigated for the innermost layers of tracking devices for the foreseen upgrades of the LHC experiments. Sensor prototypes compatible with the CMS readout, fabricated by Sintef, were tested in the laboratory and with a 120 GeV/c proton beam at the Fermilab test beam facility before and after irradiation with up to 2 × 10 15 neq/cm 2 fluence. Preliminary results of the data analysis are presented.

  11. KSC-2014-2293

    NASA Image and Video Library

    2014-04-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Multi-Payload Processing Facility, or MPPF, at NASA's Kennedy Space Center in Florida. Inside the high bay, Skip Williams, Ground Systems Development and Operations, or GSDO, deputy project manager for the spacecraft offline element integration team, points out artist illustrations of how the MPPF's interior and exterior will look after modifications and upgrades have been completed. Kennedy's Center Operations Directorate is overseeing upgrades to the MPPF for GSDO Program. The extensive upgrades and modernizations will support processing of Orion spacecraft for NASA's exploration missions. The 19,647-square-foot building, originally constructed in 1995, primarily will be used for Orion hypergolic fueling, ammonia servicing and high-pressure gas servicing and checkout before being transported to the Vehicle Assembly Building for integration with the Space Launch System. Photo credit: NASA/Daniel Casper

  12. Financing Energy Upgrades for K-12 School Districts: A Guide to Tapping into Funding for Energy Efficiency and Renewable Energy Improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goggio Borgeson, Merrian; Zimring, Mark

    This guide focuses on clean energy financing options for school administrators, facility managers, and other K-12 school decision makers who are considering investments in high performance school projects. This guide explicitly focuses on comprehensive energy upgrades, those that involve multiple measures and are targeted toward achieving significant energy savings. Successful implementation of clean energy upgrades in schools is a matter of understanding the opportunity, making the commitment, and creatively tapping into available financing. This guide attempts to provide the foundation needed for successful projects in U.S. schools. It walks through the financing options available to K-12 schools and provides casemore » studies of six school districts from around the country.« less

  13. Control console replacement at the WPI Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  14. Radioactive source calibration test of the CMS Hadron Endcap Calorimeter test wedge with Phase I upgrade electronics

    NASA Astrophysics Data System (ADS)

    Chatrchyan, S.; Sirunyan, A. M.; Tumasyan, A.; Litomin, A.; Mossolov, V.; Shumeiko, N.; Van De Klundert, M.; Van Haevermaet, H.; Van Mechelen, P.; Van Spilbeeck, A.; Alves, G. A.; Aldá Júnior, W. L.; Hensel, C.; Carvalho, W.; Chinellato, J.; De Oliveira Martins, C.; Matos Figueiredo, D.; Mora Herrera, C.; Nogima, H.; Prado Da Silva, W. L.; Tonelli Manganote, E. J.; Vilela Pereira, A.; Finger, M.; Finger, M., Jr.; Kveton, A.; Tomsa, J.; Adamov, G.; Tsamalaidze, Z.; Behrens, U.; Borras, K.; Campbell, A.; Costanza, F.; Gunnellini, P.; Lobanov, A.; Melzer-Pellmann, I.-A.; Muhl, C.; Roland, B.; Sahin, M.; Saxena, P.; Hegde, V.; Kothekar, K.; Pandey, S.; Sharma, S.; Beri, S. B.; Bhawandeep, B.; Chawla, R.; Kalsi, A.; Kaur, A.; Kaur, M.; Walia, G.; Bhattacharya, S.; Ghosh, S.; Nandan, S.; Purohit, A.; Sharan, M.; Banerjee, S.; Bhattacharya, S.; Chatterjee, S.; Das, P.; Guchait, M.; Jain, S.; Kumar, S.; Maity, M.; Majumder, G.; Mazumdar, K.; Patil, M.; Sarkar, T.; Juodagalvis, A.; Afanasiev, S.; Bunin, P.; Ershov, Y.; Golutvin, I.; Malakhov, A.; Moisenz, P.; Smirnov, V.; Zarubin, A.; Chadeeva, M.; Chistov, R.; Danilov, M.; Popova, E.; Rusinov, V.; Andreev, Yu.; Dermenev, A.; Karneyeu, A.; Krasnikov, N.; Tlisov, D.; Toropin, A.; Epshteyn, V.; Gavrilov, V.; Lychkovskaya, N.; Popov, V.; Pozdnyakov, I.; Safronov, G.; Toms, M.; Zhokin, A.; Baskakov, A.; Belyaev, A.; Boos, E.; Dubinin, M.; Dudko, L.; Ershov, A.; Gribushin, A.; Kaminskiy, A.; Klyukhin, V.; Kodolova, O.; Lokhtin, I.; Miagkov, I.; Obraztsov, S.; Petrushanko, S.; Savrin, V.; Snigirev, A.; Andreev, V.; Azarkin, M.; Dremin, I.; Kirakosyan, M.; Leonidov, A.; Terkulov, A.; Bitioukov, S.; Elumakhov, D.; Kalinin, A.; Krychkine, V.; Mandrik, P.; Petrov, V.; Ryutin, R.; Sobol, A.; Troshin, S.; Volkov, A.; Sekmen, S.; Rumerio, P.; Adiguzel, A.; Bakirci, N.; Cerci, S.; Damarseckin, S.; Demiroglu, Z. S.; Dölek, F.; Dozen, C.; Dumanoglu, I.; Eskut, E.; Girgis, S.; Gokbulut, G.; Guler, Y.; Hos, I.; Kangal, E. E.; Kara, O.; Kayis Topaksu, A.; Işik, C.; Kiminsu, U.; Oglakci, M.; Onengut, G.; Ozdemir, K.; Ozturk, S.; Polatoz, A.; Sunar Cerci, D.; Tali, B.; Topakli, H.; Turkcapar, S.; Zorbakir, I. S.; Zorbilmez, C.; Bilin, B.; Isildak, B.; Karapinar, G.; Murat Guler, A.; Ocalan, K.; Yalvac, M.; Zeyrek, M.; Atakisi, I. O.; Gülmez, E.; Kaya, M.; Kaya, O.; Koseyan, O. K.; Ozcelik, O.; Ozkorucuklu, S.; Tekten, S.; Yetkin, E. A.; Yetkin, T.; Cankocak, K.; Sen, S.; Boyarintsev, A.; Grynyov, B.; Levchuk, L.; Popov, V.; Sorokin, P.; Flacher, H.; Borzou, A.; Call, K.; Dittmann, J.; Hatakeyama, K.; Liu, H.; Pastika, N.; Buccilli, A.; Cooper, S. I.; Henderson, C.; West, C.; Arcaro, D.; Gastler, D.; Hazen, E.; Rohlf, J.; Sulak, L.; Wu, S.; Zou, D.; Hakala, J.; Heintz, U.; Kwok, K. H. M.; Laird, E.; Landsberg, G.; Mao, Z.; Yu, D. R.; Gary, J. W.; Ghiasi Shirazi, S. M.; Lacroix, F.; Long, O. R.; Wei, H.; Bhandari, R.; Heller, R.; Stuart, D.; Yoo, J. H.; Chen, Y.; Duarte, J.; Lawhorn, J. M.; Nguyen, T.; Spiropulu, M.; Winn, D.; Abdullin, S.; Apresyan, A.; Apyan, A.; Banerjee, S.; Chlebana, F.; Freeman, J.; Green, D.; Hare, D.; Hirschauer, J.; Joshi, U.; Lincoln, D.; Los, S.; Pedro, K.; Spalding, W. J.; Strobbe, N.; Tkaczyk, S.; Whitbeck, A.; Linn, S.; Markowitz, P.; Martinez, G.; Bertoldi, M.; Hagopian, S.; Hagopian, V.; Kolberg, T.; Baarmand, M. M.; Noonan, D.; Roy, T.; Yumiceva, F.; Bilki, B.; Clarida, W.; Debbins, P.; Dilsiz, K.; Durgut, S.; Gandrajula, R. P.; Haytmyradov, M.; Khristenko, V.; Merlo, J.-P.; Mermerkaya, H.; Mestvirishvili, A.; Miller, M.; Moeller, A.; Nachtman, J.; Ogul, H.; Onel, Y.; Ozok, F.; Penzo, A.; Schmidt, I.; Snyder, C.; Southwick, D.; Tiras, E.; Yi, K.; Al-bataineh, A.; Bowen, J.; Castle, J.; McBrayer, W.; Murray, M.; Wang, Q.; Kaadze, K.; Maravin, Y.; Mohammadi, A.; Saini, L. K.; Baden, A.; Belloni, A.; Calderon, J. D.; Eno, S. C.; Feng, Y. B.; Ferraioli, C.; Grassi, T.; Hadley, N. J.; Jeng, G.-Y.; Kellogg, R. G.; Kunkle, J.; Mignerey, A.; Ricci-Tam, F.; Shin, Y. H.; Skuja, A.; Yang, Z. S.; Yao, Y.; Brandt, S.; D'Alfonso, M.; Hu, M.; Klute, M.; Niu, X.; Chatterjee, R. M.; Evans, A.; Frahm, E.; Kubota, Y.; Lesko, Z.; Mans, J.; Ruckstuhl, N.; Heering, A.; Karmgard, D. J.; Musienko, Y.; Ruchti, R.; Wayne, M.; Benaglia, A. D.; Medvedeva, T.; Mei, K.; Tully, C.; Bodek, A.; de Barbaro, P.; Galanti, M.; Garcia-Bellido, A.; Khukhunaishvili, A.; Lo, K. H.; Vishnevskiy, D.; Zielinski, M.; Agapitos, A.; Amouzegar, M.; Chou, J. P.; Hughes, E.; Saka, H.; Sheffield, D.; Akchurin, N.; Damgov, J.; De Guio, F.; Dudero, P. R.; Faulkner, J.; Gurpinar, E.; Kunori, S.; Lamichhane, K.; Lee, S. W.; Libeiro, T.; Mengke, T.; Muthumuni, S.; Undleeb, S.; Volobouev, I.; Wang, Z.; Goadhouse, S.; Hirosky, R.; Wang, Y.

    2017-12-01

    The Phase I upgrade of the CMS Hadron Endcap Calorimeters consists of new photodetectors (Silicon Photomultipliers in place of Hybrid Photo-Diodes) and front-end electronics. The upgrade will eliminate the noise and the calibration drift of the Hybrid Photo-Diodes and enable the mitigation of the radiation damage of the scintillators and the wavelength shifting fibers with a larger spectral acceptance of the Silicon Photomultipliers. The upgrade also includes increased longitudinal segmentation of the calorimeter readout, which allows pile-up mitigation and recalibration due to depth-dependent radiation damage. As a realistic operational test, the responses of the Hadron Endcap Calorimeter wedges were calibrated with a 60Co radioactive source with upgrade electronics. The test successfully established the procedure for future source calibrations of the Hadron Endcap Calorimeters. Here we describe the instrumentation details and the operational experiences related to the sourcing test.

  15. Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less

  16. Environmental Assessment for Basewide Facilities Upgrade at Clear Air Force Station, Alaska

    DTIC Science & Technology

    2005-12-01

    lividum), alpine sweetvetch (Hedysarum alpinum), cold mountain crazyweed (Oxytropis campestris), silverberry (Elaeagnus commutata), alpine arnica ... Arnica alpina), blue joint grass (Calamagrostis canadensis), large-flowered wintergreen (Pyrola grandiflora), boreal yarrow (Achillea borealis), Siberian

  17. Demonstration of New OLAF Capabilities and Technologies

    NASA Astrophysics Data System (ADS)

    Kingston, C.; Palmer, E.; Stone, J.; Neese, C.; Mueller, B.

    2017-06-01

    Upgrades to the On-Line Archiving Facility (OLAF) PDS tool are leading to improved usability and additional functionality by integration of JavaScript web app frameworks. Also included is the capability to upload tabular data as CSV files.

  18. Acquisition of equipment for composite manufacturing laboratory.

    DOT National Transportation Integrated Search

    2009-12-01

    An interdisciplinary team of faculty was formed to upgrade the Composite Manufacturing and Testing Facilities at Missouri S&T. The Metering Unit is useful to manufacture composite pultruded parts using two part polyurethane resin system. Prior to the...

  19. Get More for Your Maintenance Dollar through Contracting.

    ERIC Educational Resources Information Center

    Donahue, Ron

    1983-01-01

    The use of contractors for the performance of maintenance duties in parks and recreational facilities is recommended as a legitimate tool to improve productivity or upgrade quality. An example of the use of contracts is provided. (CJ)

  20. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...

  1. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...

  2. Tunnel vision for US X-ray free-electron laser

    NASA Astrophysics Data System (ADS)

    Banks, Michael

    2017-03-01

    Construction can begin on a major upgrade to the Linac Coherent Light Source (LCLS) at the SLAC National Accelerator Laboratory in the US after the tunnel that will house the facility was cleared of equipment.

  3. 77 FR 27797 - Request for Certification of Compliance-Rural Industrialization Loan and Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... 4279-2) for the following: Applicant/Location: Samoa Cold Storage, Inc. Principal Product/Purpose: The... demolition of the interior of the existing facility, renovations and improvements, repairs and upgrades and...

  4. The PIP-II Conceptual Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ball, M.; Burov, A.; Chase, B.

    2017-03-01

    The Proton Improvement Plan-II (PIP-II) encompasses a set of upgrades and improvements to the Fermilab accelerator complex aimed at supporting a world-leading neutrino program over the next several decades. PIP-II is an integral part of the strategic plan for U.S. High Energy Physics as described in the Particle Physics Project Prioritization Panel (P5) report of May 2014 and formalized through the Mission Need Statement approved in November 2015. As an immediate goal, PIP-II is focused on upgrades to the Fermilab accelerator complex capable of providing proton beam power in excess of 1 MW on target at the initiation of themore » Long Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) program, currently anticipated for the mid- 2020s. PIP-II is a part of a longer-term goal of establishing a high-intensity proton facility that is unique within the world, ultimately leading to multi-MW capabilities at Fermilab....« less

  5. An X-Band Gun Test Area at SLAC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Limborg-Deprey, C.; Adolphsen, C.; Chu, T.S.

    The X-Band Test Area (XTA) is being assembled in the NLCTA tunnel at SLAC to serve as a test facility for new RF guns. The first gun to be tested will be an upgraded version of the 5.6 cell, 200 MV/m peak field X-band gun designed at SLAC in 2003 for the Compton Scattering experiment run in ASTA. This new version includes some features implemented in 2006 on the LCLS gun such as racetrack couplers, increased mode separation and elliptical irises. These upgrades were developed in collaboration with LLNL since the same gun will be used in an injector formore » a LLNL Gamma-ray Source. Our beamline includes an X-band acceleration section which takes the electron beam up to 100 MeV and an electron beam measurement station. Other X-Band guns such as the UCLA Hybrid gun will be characterized at our facility.« less

  6. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dyer, R.S.; Diamante, J.M.; Duffey, R.B.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility`s capacity from 1,200 m{sup 3} per year to 5,000 m{sup 3} per year, will permit the facility to processmore » high-salt wastes from the Russian Navy`s Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted.« less

  7. DFL, Canada's Space AIT Facilities - Current and Planned Capabilities

    NASA Astrophysics Data System (ADS)

    Singhal, R.; Mishra, S.; Choueiry, E.; Dumoulin, J.; Ahmed, S.

    2004-08-01

    The David Florida Laboratory (DFL) of the Canadian Space Agency is the Canadian national ISO 9001:2000 registered facility for the assembly, integration, and (environmental) testing of space hardware. This paper briefly describes the three main qualification facilities: Structural Qualification Facilities (SQF); Radio Frequency Qualification Facilities (RFQF); and Thermal Qualification Facilities (TQF). The paper also describes the planned/new upgrades/improvements to the DFL's existing capabilities. These include: cylindrical near-field antenna measurement system, current capabilities in multi-frequency multi-band passive intermodulation (PIM) measurement; combined thermal/vibration test facility, improvement in efficiency and performance of the photogrammetry capability, acquisition of an additional mass properties measurement system for small and micro-satellites; combined control and data acquisition system for all existing thermal vacuum facilities, plus a new automatic thermal control system and hypobaric chamber.

  8. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

    NASA Technical Reports Server (NTRS)

    Emrich, William J., Jr.

    2014-01-01

    Over the past year the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) has been undergoing a significant upgrade beyond its initial configuration. The NTREES facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The first phase of the upgrade activities which was completed in 2012 in part consisted of an extensive modification to the hydrogen system to permit computer controlled operations outside the building through the use of pneumatically operated variable position valves. This setup also allows the hydrogen flow rate to be increased to over 200 g/sec and reduced the operation complexity of the system. The second stage of modifications to NTREES which has just been completed expands the capabilities of the facility significantly. In particular, the previous 50 kW induction power supply has been replaced with a 1.2 MW unit which should allow more prototypical fuel element temperatures to be reached. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during. This new setup required that the NTREES vessel be raised onto a platform along with most of its associated gas and vent lines. In this arrangement, the induction heater and water systems are now located underneath the platform. In this new configuration, the 1.2 MW NTREES induction heater will be capable of testing fuel elements and fuel materials in flowing hydrogen at pressures up to 1000 psi at temperatures up to and beyond 3000 K and at near-prototypic reactor channel power densities. NTREES is also capable of testing potential fuel elements with a variety of propellants, including hydrogen with additives to inhibit corrosion of certain potential NTR fuel forms. Additional diagnostic upgrades included in the present NTREES set up include the addition of a gamma ray spectrometer located near the vent filter to detect uranium fuel particles exiting the fuel element in the propellant exhaust stream to provide additional information any material loss occurring during testing. Other aspects of the upgrade included reworking NTREES to reduce the operational complexity of the system despite the increased complexity of the induction heating system. To this end, many of the controls were consolidated on fewer panels. As part of this upgrade activity, the Safety Assessment (SA) and the Standard Operating Procedures (SOPs) for NTREES were extensively rewritten. The new 1.2 MW induction heater consists of three physical units consisting of a transformer, rectifier, and inverter. This multiunit arrangement facilitated increasing the flexibility of the induction heater by more easily allowing variable frequency operation. Frequency ranges between 20 and 60 kHz can be accommodated in the new induction heater allowing more representative power distributions to be generated within the test elements.

  9. Using mobile distributed pyrolysis facilities to deliver a forest residue resource for bio-fuel production

    NASA Astrophysics Data System (ADS)

    Brown, Duncan

    Distributed mobile conversion facilities using either fast pyrolysis or torrefaction processes can be used to convert forest residues to more energy dense substances (bio-oil, bio-slurry or torrefied wood) that can be transported as feedstock for bio-fuel facilities. All feedstock are suited for gasification, which produces syngas that can be used to synthesise petrol or diesel via Fischer-Tropsch reactions, or produce hydrogen via water gas shift reactions. Alternatively, the bio-oil product of fast pyrolysis may be upgraded to produce petrol and diesel, or can undergo steam reformation to produce hydrogen. Implementing a network of mobile facilities reduces the energy content of forest residues delivered to a bio-fuel facility as mobile facilities use a fraction of the biomass energy content to meet thermal or electrical demands. The total energy delivered by bio-oil, bio-slurry and torrefied wood is 45%, 65% and 87% of the initial forest residue energy content, respectively. However, implementing mobile facilities is economically feasible when large transport distances are required. For an annual harvest of 1.717 million m3 (equivalent to 2000 ODTPD), transport costs are reduced to less than 40% of the total levelised delivered feedstock cost when mobile facilities are implemented; transport costs account for up to 80% of feedstock costs for conventional woodchip delivery. Torrefaction provides the lowest cost pathway of delivering a forest residue resource when using mobile facilities. Cost savings occur against woodchip delivery for annual forest residue harvests above 2.25 million m3 or when transport distances greater than 250 km are required. Important parameters that influence levelised delivered costs of feedstock are transport distances (forest residue spatial density), haul cost factors, thermal and electrical demands of mobile facilities, and initial moisture content of forest residues. Relocating mobile facilities can be optimised for lowest cost delivery as transport distances of raw biomass are reduced. The overall cost of bio-fuel production is determined by the feedstock delivery pathway and also the bio-fuel production process employed. Results show that the minimum cost of petrol and diesel production is 0.86 litre -1 when a bio-oil feedstock is upgraded. This corresponds to a 2750 TPD upgrading facility requiring an annual harvest of 4.30 million m3. The miniμm cost of hydrogen production is 2.92 kg -1, via the gasification of a woodchip feedstock and subsequent water gas shift reactions. This corresponds to a 1100 ODTPD facility and requires an annual harvest of 947,000 m3. The levelised cost of bio-fuel strongly depends on the size of annual harvest required for bio-fuel facilities. There are optimal harvest volumes (bio-fuel facility sizes) for each bio-fuel production route, which yield minimum bio-fuel production costs. These occur as the benefits of economies of scale for larger bio-fuel facilities compete against increasing transport costs for larger harvests. Optimal harvest volumes are larger for bio-fuel production routes that use feedstock sourced from mobile facilities, as mobile facilities reduce total transport requirements.

  10. Nova Upgrade: A proposed ICF facility to demonstrate ignition and gain, revision 1

    NASA Astrophysics Data System (ADS)

    1992-07-01

    The present objective of the national Inertial Confinement Fusion (ICF) Program is to determine the scientific feasibility of compressing and heating a small mass of mixed deuterium and tritium (DT) to conditions at which fusion occurs and significant energy is released. The potential applications of ICF will be determined by the resulting fusion energy yield (amount of energy produced) and gain (ratio of energy released to energy required to heat and compress the DT fuel). Important defense and civilian applications, including weapons physics, weapons effects simulation, and ultimately the generation of electric power will become possible if yields of 100 to 1,000 MJ and gains exceeding approximately 50 can be achieved. Once ignition and propagating bum producing modest gain (2 to 10) at moderate drive energy (1 to 2 MJ) has been achieved, the extension to high gain (greater than 50) is straightforward. Therefore, the demonstration of ignition and modest gain is the final step in establishing the scientific feasibility of ICF. Lawrence Livermore National Laboratory (LLNL) proposes the Nova Upgrade Facility to achieve this demonstration by the end of the decade. This facility would be constructed within the existing Nova building at LLNL for a total cost of approximately $400 M over the proposed FY 1995-1999 construction period. This report discusses this facility.

  11. Emergency supply of doctors by the Mais Médicos (More Doctors) Program and the quality of the structure of primary health care facilities.

    PubMed

    Giovanella, Ligia; Mendonça, Maria Helena Magalhães de; Fausto, Marcia Cristina Rodrigues; Almeida, Patty Fidelis de; Bousquat, Aylene; Lima, Juliana Gagno; Seidl, Helena; Franco, Cassiano Mendes; Fusaro, Edgard Rodrigues; Almeida, Sueli Zeferino Ferreira

    2016-09-01

    The health policy context in Brazil has featured a series of measures to improve primary health care (PHC), including a national access and quality improvement program (Programa Nacional de Melhoria do Acesso e Qualidade, PMAQ-AB) and the Mais Médicos Program (More Doctors, PMM) and upgrading PHC centers ('Requalifica UBS'). The paper examines the PMM's placement of doctors, by quality of PHC structure, in an endeavor to identify synergies among the three programs. It reports on a transverse study based on secondary data from PMAQ-AB Cycles 1 and 2, the PMM and 'Requalifica UBS'. The PHC facilities inventoried during PMAQ-AB Cycle 1 were classified, on pre-established typology, into five groups ranked from A (best) to E (failed). They were then compared in terms of PMM personnel allocated and Requalifica UBS proposals. The results point to convergences in investments by the three programs. Incentives targeted predominantly PHC facilities of types B and C, indicating a concentration of efforts on PHC facilities with potential for structural quality improvements. In addition to expanding access, the provision of doctors by the PMM, added to infrastructure upgrades and work process improvements, contributes to addressing high turnover and guaranteeing retention of doctors in PHC.

  12. Technical developments for an upgrade of the LEBIT Penning trap mass spectrometry facility for rare isotopes

    NASA Astrophysics Data System (ADS)

    Redshaw, M.; Barquest, B. R.; Bollen, G.; Bustabad, S. E.; Campbell, C. M.; Ferrer, R.; Gehring, A.; Kwiatkowski, A. A.; Lincoln, D. L.; Morrissey, D. J.; Pang, G. K.; Ringle, R.; Schwarz, S.

    2011-07-01

    The LEBIT (Low Energy Beam and Ion Trap) facility is the only Penning trap mass spectrometry (PTMS) facility to utilize rare isotopes produced via fast-beam fragmentation. This technique allows access to practically all elements lighter than uranium, and in particular enables the production of isotopes that are not available or that are difficult to obtain at isotope separation on-line facilities. The preparation of the high-energy rare-isotope beam produced by projectile fragmentation for low-energy PTMS experiments is achieved by gas stopping to slow down and thermalize the fast-beam ions, along with an rf quadrupole cooler and buncher and rf quadrupole ion guides to deliver the beam to the Penning trap. During its first phase of operation LEBIT has been very successful, and new developments are now underway to access rare isotopes even farther from stability, which requires dealing with extremely short lifetimes and low production rates. These developments aim at increasing delivery efficiency, minimizing delivery and measurement time, and maximizing use of available beam time. They include an upgrade to the gas-stopping station, active magnetic field monitoring and stabilization by employing a miniature Penning trap as a magnetometer, the use of stored waveform inverse Fourier transform (SWIFT) to most effectively remove unwanted ions, and charge breeding.

  13. The Employment Impact of the Des Moines Occupational Upgrading Project and Model Cities High School Equivalency Project: Project Year One Evaluation.

    ERIC Educational Resources Information Center

    Palomba, Neil A.; And Others

    This study was conducted to: (1) evaluate the Occupational Upgrading Project (OUP) and the Model Neighborhood High School Equivalency (HSE) Project's first year of operation, and (2) create baseline data from which future and more conclusive evaluation can be undertaken. Data were gathered by conducting open-ended interviews with the…

  14. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  15. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  16. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  17. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  18. KSC-98pc1164

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis is towed away from the Shuttle Landing Facility after returning home from California atop its Shuttle Carrier Aircraft. The orbiter spent 10 months in Palmdale undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  19. Upgrade of MacCHESS facility for X-ray scattering of biological macromolecules in solution

    PubMed Central

    Acerbo, Alvin Samuel; Cook, Michael J.; Gillilan, Richard Edward

    2015-01-01

    X-ray scattering of biological macromolecules in solution is an increasingly popular tool for structural biology and benefits greatly from modern high-brightness synchrotron sources. The upgraded MacCHESS BioSAXS station is now located at the 49-pole wiggler beamline G1. The 20-fold improved flux over the previous beamline F2 provides higher sample throughput and autonomous X-ray scattering data collection using a unique SAXS/WAXS dual detectors configuration. This setup achieves a combined q-range from 0.007 to 0.7 Å−1, enabling better characterization of smaller molecules, while opening opportunities for emerging wide-angle scattering methods. In addition, a facility upgrade of the positron storage ring to continuous top-up mode has improved beam stability and eliminated beam drift over the course of typical BioSAXS experiments. Single exposure times have been reduced to 2 s for 3.560 mg ml−1 lysozyme with an average quality factor I/σ of 20 in the Guinier region. A novel disposable plastic sample cell design that incorporates lower background X-ray window material provides users with a more pristine sample environment than previously available. Systematic comparisons of common X-ray window materials bonded to the cell have also been extended to the wide-angle regime, offering new insight into best choices for various q-space ranges. In addition, a quantitative assessment of signal-to-noise levels has been performed on the station to allow users to estimate necessary exposure times for obtaining usable signals in the Guinier regime. Users also have access to a new BioSAXS sample preparation laboratory which houses essential wet-chemistry equipment and biophysical instrumentation. User experiments at the upgraded BioSAXS station have been on-going since commissioning of the beamline in Summer 2013. A planned upgrade of the G1 insertion device to an undulator for the Winter 2014 cycle is expected to further improve flux by an order of magnitude. PMID:25537607

  20. Design of an upgradeable 45-100 mA RFQ accelerator for FAIR

    NASA Astrophysics Data System (ADS)

    Zhang, Chuan; Schempp, Alwin

    2009-10-01

    A 325 MHz, 35 mA, 3 MeV Radio-Frequency Quadrupole (RFQ) accelerator will be operated as the first accelerating structure of the proton linac injector for the newly planned international science center Facility for Antiproton and Ion Research (FAIR) at GSI, Germany. In previous design studies, two high beam intensities, 70 and 100 mA, were used. Most recently, the design intensity has been changed to 45 mA, which is closer to the operational value. Taking advantage of the so-called New Four-Section Procedure, a new design, which is upgradable from 45 to 100 mA, has been developed for the FAIR proton RFQ. Besides the upgradability analyses, robustness studies of the new design to spatial displacements of the input beam and field errors are presented as well.

  1. The Linac Coherent Light Source: Recent Developments and Future Plans

    DOE PAGES

    Schoenlein, R. W.; Boutet, S.; Minitti, M. P.; ...

    2017-08-18

    The development of X-ray free-electron lasers (XFELs) has launched a new era in X-ray science by providing ultrafast coherent X-ray pulses with a peak brightness that is approximately one billion times higher than previous X-ray sources. The Linac Coherent Light Source (LCLS) facility at the SLAC National Accelerator Laboratory, the world’s first hard X-ray FEL, has already demonstrated a tremendous scientific impact across broad areas of science. Here in this paper, a few of the more recent representative highlights from LCLS are presented in the areas of atomic, molecular, and optical science; chemistry; condensed matter physics; matter in extreme conditions;more » and biology. This paper also outlines the near term upgrade (LCLS-II) and motivating science opportunities for ultrafast X-rays in the 0.25–5 keV range at repetition rates up to 1 MHz. Future plans to extend the X-ray energy reach to beyond 13 keV (<1 Å) at high repetition rate (LCLS-II-HE) are envisioned, motivated by compelling new science of structural dynamics at the atomic scale.« less

  2. National Ignition Facility Control and Information System Operational Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, C D; Beeler, R G; Bowers, G A

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a {approx}2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint themore » size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.« less

  3. Design of bunch compressing system with suppression of coherent synchrotron radiation for ATF upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jing, Yichao; Fedurin, Mikhail; Stratakis, Diktys

    2015-05-03

    One of the operation modes for Accelerator Test Facility (ATF) upgrade is to provide high peak current, high quality electron beam for users. Such operation requires a bunch compressing system with a very large compression ratio. The CSR originating from the strong compressors generally could greatly degrade the quality of the electron beam. In this paper, we present our design for the entire bunch compressing system that will limit the effect of CSR on the e-beam’s quality. We discuss and detail the performance from the start to end simulation of such a compressor for ATF.

  4. Perimeter security for Minnesota correctional facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crist, D.; Spencer, D.D.

    1996-12-31

    For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned newmore » construction at other facilities.« less

  5. KSC-98pc1166

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis, being towed from the Shuttle Landing Facility toward the Vehicle Assembly Building (VAB) , intersects the morning sun's rays. In the background, to the right of the VAB, are the Orbiter Processing Facility 1 and 2. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations at KSC in Orbiter Processing Facility 2 for its planned flight in June 1999

  6. Automated data collection based on RoboDiff at the ESRF beamline MASSIF-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nurizzo, Didier, E-mail: Didier.nurizzo@esrf.fr; Guichard, Nicolas; McSweeney, Sean

    2016-07-27

    The European Synchrotron Radiation Facility has a long standing history in the automation of experiments in Macromolecular Crystallography. MASSIF-1 (Massively Automated Sample Screening and evaluation Integrated Facility), a beamline constructed as part of the ESRF Upgrade Phase I program, has been open to the external user community since July 2014 and offers a unique completely automated data collection service to both academic and industrial structural biologists.

  7. KSC-00padig018

    NASA Image and Video Library

    2000-05-02

    The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park

  8. Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico

    DTIC Science & Technology

    2014-09-01

    to house the newly formed 498th Nuclear Systems Wing. This facility will be a two-story, steel-framed structure with reinforced concrete foundation ...occurs at depths of 200 to 400 feet below ground surface . The perched aquifer is a result of infiltration of water from both man-made and natural origins...as a Sensitive Compartmented Information Facility with reinforced concrete foundation , floors, and reinforced masonry walls. The construction

  9. Transparent Armor Cost Benefit Study

    DTIC Science & Technology

    2008-04-01

    2005 2006 UNCLASSIFIED UNCLASSIFIED 4/30/2008 4/17 2006 “Iraqi Pope Glass” 2004-2005 - GPK Recent HistoryEarly OIF Curb Wt: 10,300lbs GVW: 12,100lbs...UNCLASSIFIED UNCLASSIFIED 4/30/2008 5/17 Future Transparent Gun Shields Requirement: Upgrade GPKS with transparent armor for enhanced situational...awareness while maintaining soldier cover within armor envelope. AHI GS & GPK Upgraded Gunner Shield – Transparent Armored Gun Shield (TAGS

  10. Transparent Armor Cost Benefit Study

    DTIC Science & Technology

    2006-10-30

    added this cocoon to approximately 100 HMMWVs in Ramadi. 2006 “Iraqi Pope Glass” 2004-2005 - GPK Recent HistoryEarly OIF Curb Wt: 10,300lbs GVW...12,100lbs UNCLASSIFIED UNCLASSIFIED 10/30/2006 5/14 Future Transparent Gun Shields Requirement: Upgrade GPKS with transparent armor for enhanced...situational awareness while maintaining soldier cover within armor envelope. AHI GS & GPK Upgraded Gunner Shield – Transparent Armored Gun Shield (TAGS

  11. Upgrade of the BATMAN test facility for H- source development

    NASA Astrophysics Data System (ADS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  12. New developments in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Fitzgerald, Michael P.; Johnson, James; Larkin, James E.; Lewis, Hilton A.; Martin, Christopher; Matthews, Keith Y.; Prochaska, J. X.; Wizinowich, Peter

    2014-07-01

    The W. M. Keck Observatory continues to develop new capabilities in support of our science driven strategic plan which emphasizes leadership in key areas of observational astronomy. This leadership is a key component of the scientific productivity of our observing community and depends on our ability to develop new instrumentation, upgrades to existing instrumentation, and upgrades to supporting infrastructure at the observatory. In this paper we describe the as measured performance of projects completed in 2014 and the expected performance of projects currently in the development or construction phases. Projects reaching completion in 2014 include a near-IR tip/tilt sensor for the Keck I adaptive optics system, a new center launch system for the Keck II laser guide star facility, and NIRES, a near-IR Echelle spectrograph for the Keck II telescope. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager, a deployable tertiary mirror for the Keck I telescope, upgrades to the spectrograph detector and the imager of the OSIRIS instrument, and an upgrade to the telescope control systems on both Keck telescopes.

  13. Advanced Test Reactor Safety Basis Upgrade Lessons Learned Relative to Design Basis Verification and Safety Basis Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    G. L. Sharp; R. T. McCracken

    The Advanced Test Reactor (ATR) is a pressurized light-water reactor with a design thermal power of 250 MW. The principal function of the ATR is to provide a high neutron flux for testing reactor fuels and other materials. The reactor also provides other irradiation services such as radioisotope production. The ATR and its support facilities are located at the Test Reactor Area of the Idaho National Engineering and Environmental Laboratory (INEEL). An audit conducted by the Department of Energy's Office of Independent Oversight and Performance Assurance (DOE OA) raised concerns that design conditions at the ATR were not adequately analyzedmore » in the safety analysis and that legacy design basis management practices had the potential to further impact safe operation of the facility.1 The concerns identified by the audit team, and issues raised during additional reviews performed by ATR safety analysts, were evaluated through the unreviewed safety question process resulting in shutdown of the ATR for more than three months while these concerns were resolved. Past management of the ATR safety basis, relative to facility design basis management and change control, led to concerns that discrepancies in the safety basis may have developed. Although not required by DOE orders or regulations, not performing design basis verification in conjunction with development of the 10 CFR 830 Subpart B upgraded safety basis allowed these potential weaknesses to be carried forward. Configuration management and a clear definition of the existing facility design basis have a direct relation to developing and maintaining a high quality safety basis which properly identifies and mitigates all hazards and postulated accident conditions. These relations and the impact of past safety basis management practices have been reviewed in order to identify lessons learned from the safety basis upgrade process and appropriate actions to resolve possible concerns with respect to the current ATR safety basis. The need for a design basis reconstitution program for the ATR has been identified along with the use of sound configuration management principles in order to support safe and efficient facility operation.« less

  14. National synchrotron light source. Activity report, October 1, 1995--September 30, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rothman, E.Z.; Hastings, J.B.

    1997-05-01

    The hard work done by the synchrotron radiation community, in collaboration with all those using large-scale central facilities during 1995, paid off in FY 1996 through the DOE`s Presidential Scientific Facilities Initiative. In comparison with the other DOE synchrotron radiation facilities, the National Synchrotron Light Source benefited least in operating budgets because it was unable to increase running time beyond 100%-nevertheless, the number of station hours was maintained. The major thrust at Brookhaven came from a 15% increase in budget which allowed the recruitment of seven staff in the beamlines support group and permitted a step increment in the fundingmore » of the extremely long list of upgrades; both to the sources and to the beamlines. During the December 1995 shutdown, the VUV Ring quadrant around U10-U12 was totally reconstructed. New front ends, enabling apertures up to 90 mrad on U10 and U12, were installed. During the year new PRTs were in formation for the infrared beamlines, encouraged by the investment the lab was able to commit from the initiative funds and by awards from the Scientific Facilities Initiative. A new PRT, specifically for small and wide angle x-ray scattering from polymers, will start work on X27C in FY 1997 and existing PRTs on X26C and X9B working on macromolecular crystallography will be joined by new members. Plans to replace aging radio frequency cavities by an improved design, originally a painfully slow six or eight year project, were brought forward so that the first pair of cavities (half of the project for the X-Ray Ring) will now be installed in FY 1997. Current upgrades to 350 mA initially and to 438 mA later in the X-Ray Ring were set aside due to lack of funds for the necessary thermally robust beryllium windows. The Scientific Facilities Initiative allowed purchase of all 34 windows in FY 1996 so that the power upgrade will be achieved in FY 1997.« less

  15. The conversion of a room temperature NaK loop to a high temperature MHD facility for Li/V blanket testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, C.B.; Haglund, R.C.; Miller, M.E.

    1996-12-31

    The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Pro-ram, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the Near the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magneto-hydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) frommore » a 200{degrees}C NaK facility to a 350{degrees}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degrees}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer multiple-hour, MHD tests, all at 230{degrees}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000.« less

  16. Conversion of a room temperature NaK loop to a high temperature MHD facility for Li/V blanket testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reed, C.B.; Haglund, R.C.; Miller, M.E.

    1996-12-31

    The Vanadium/Lithium system has been the recent focus of ANL`s Blanket Technology Program, and for the last several years, ANL`s Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magnetohydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne`s Liquid Metal EXperiment (ALEX) from a 200{degree}Cmore » NaK facility to a 350{degree}C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10{sup 3} to 10{sup 5} in lithium at 350{degree}C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer, multiple-hour, MHD tests, all at 230{degree}C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000. 4 refs., 2 figs.« less

  17. Control console replacement at the WPI Reactor. [Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  18. Brookhaven National Laboratory's Accelerator Test Facility: research highlights and plans

    NASA Astrophysics Data System (ADS)

    Pogorelsky, I. V.; Ben-Zvi, I.

    2014-08-01

    The Accelerator Test Facility (ATF) at Brookhaven National Laboratory has served as a user facility for accelerator science for over a quarter of a century. In fulfilling this mission, the ATF offers the unique combination of a high-brightness 80 MeV electron beam that is synchronized to a 1 TW picosecond CO2 laser. We unveil herein our plan to considerably expand the ATF's floor space with an upgrade of the electron beam's energy to 300 MeV and the CO2 laser's peak power to 100 TW. This upgrade will propel the ATF even further to the forefront of research on advanced accelerators and radiation sources, supporting the most innovative ideas in this field. We discuss emerging opportunities for scientific breakthroughs, including the following: plasma wakefield acceleration studies in research directions already active at the ATF; laser wakefield acceleration (LWFA), where the longer laser wavelengths are expected to engender a proportional increase in the beam's charge while our linac will assure, for the first time, the opportunity to undertake detailed studies of seeding and staging of the LWFA; proton acceleration to the 100-200 MeV level, which is essential for medical applications; and others.

  19. Operational Experience of the Upgraded Cryogenic Systems at the Nscl

    NASA Astrophysics Data System (ADS)

    McCartney, A. H.; Laumer, H. L.; Jones, S. A.

    2010-04-01

    The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.

  20. Risk assessment of CST-7 proposed waste treatment and storage facilities Volume I: Limited-scope probabilistic risk assessment (PRA) of proposed CST-7 waste treatment & storage facilities. Volume II: Preliminary hazards analysis of proposed CST-7 waste storage & treatment facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sasser, K.

    1994-06-01

    In FY 1993, the Los Alamos National Laboratory Waste Management Group [CST-7 (formerly EM-7)] requested the Probabilistic Risk and Hazards Analysis Group [TSA-11 (formerly N-6)] to conduct a study of the hazards associated with several CST-7 facilities. Among these facilities are the Hazardous Waste Treatment Facility (HWTF), the HWTF Drum Storage Building (DSB), and the Mixed Waste Receiving and Storage Facility (MWRSF), which are proposed for construction beginning in 1996. These facilities are needed to upgrade the Laboratory`s storage capability for hazardous and mixed wastes and to provide treatment capabilities for wastes in cases where offsite treatment is not availablemore » or desirable. These facilities will assist Los Alamos in complying with federal and state requlations.« less

  1. Flood Gives Birth to Dream School.

    ERIC Educational Resources Information Center

    Freeman, Laurie

    1996-01-01

    Forced by flooding of the Mississippi River to relocate their entire town, residents of tiny Valmeyer, Illinois, built an upgraded, improved school. The new facility serves elementary, middle, and high school students in three separate wings and is equipped to participate in distance learning. (MLF)

  2. Pawcatuck School.

    ERIC Educational Resources Information Center

    Randall, Kathleen

    1993-01-01

    Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)

  3. The European VLBI network

    NASA Technical Reports Server (NTRS)

    Schilizzi, R. T.

    1980-01-01

    The capabilities of the European very long baseline interferometry (VLBI) network are summarized. The range of baseline parameters, sensitivities, and recording and other equipment available are included. Plans for upgrading the recording facilities and the use of geostationary satellites for signal transfer and clock synchronization are discussed.

  4. PDS4: Developing the Next Generation Planetary Data System

    NASA Technical Reports Server (NTRS)

    Crichton, D.; Beebe, R.; Hughes, S.; Stein, T.; Grayzeck, E.

    2011-01-01

    The Planetary Data System (PDS) is in the midst of a major upgrade to its system. This upgrade is a critical modernization of the PDS as it prepares to support the future needs of both the mission and scientific community. It entails improvements to the software system and the data standards, capitalizing on newer, data system approaches. The upgrade is important not only for the purpose of capturing results from NASA planetary science missions, but also for improving standards and interoperability among international planetary science data archives. As the demands of the missions and science community increase, PDS is positioning itself to evolve and meet those demands.

  5. Upgrading of bio-oil from the pyrolysis of biomass over the rice husk ash catalysts

    NASA Astrophysics Data System (ADS)

    Sutrisno, B.; Hidayat, A.

    2016-11-01

    The pyrolysis oils are complex mixtures of organic compounds that exhibit a wide spectrum of chemical functionality, and generally contain some water. Their direct use as fuels may present some difficulties due to their high viscosity, poor heating value, corrosiveness and instability. For possible future use as replacements for hydrocarbon chemical feedstocks and fuels, the liquids will require considerable upgrading to improve its characteristics. By esterification of the bio oil as the upgrading method, the properties of the bio-oil could be improved. In the paper, the upgrading of a bio-oil obtained by pyrolysis was studied over rice husk ash catalysts. The raw bio-oil was produced by pyrolysis of rice husk.From the experiment results, it can be concluded that the densities of upgraded bio-oil were reduced from 1.24 to 0.95 g.cm-3, and the higherheating value increased from 16.0 to 27.2 MJ/kg and the acidity of upgraded bio-oil was also alleviated from 2.3 to 4.4. The results of gas chromatography-mass spectrometry (GC-MS) and FT-IR analysis showed that the ester compounds in the upgraded bio-oil increased. It is possible to improve the properties of bio-oil by esterifying the raw bio-oil.

  6. Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowden-Swan, Lesley J.; Zhu, Yunhua; Jones, Susanne B.

    A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from MetroVancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data from thismore » effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the smaller scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by the resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: • Optimization of HTL sludge feed solids content • Optimization of HTL biocrude yield • Optimization of HTL reactor liquid hourly space velocity (LHSV) • Optimization of fuel yield from hydrotreating • Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigate risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.« less

  7. Hydrothermal Liquefaction and Upgrading of Municipal Wastewater Treatment Plant Sludge: A Preliminary Techno-Economic Analysis, Rev.1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Snowden-Swan, Lesley J.; Zhu, Yunhua; Jones, Susanne B.

    A preliminary process model and techno-economic analysis (TEA) was completed for fuel produced from hydrothermal liquefaction (HTL) of sludge waste from a municipal wastewater treatment plant (WWTP) and subsequent biocrude upgrading. The model is adapted from previous work by Jones et al. (2014) for algae HTL, using experimental data generated in fiscal year 2015 (FY15) bench-scale HTL testing of sludge waste streams. Testing was performed on sludge samples received from Metro Vancouver’s Annacis Island WWTP (Vancouver, B.C.) as part of a collaborative project with the Water Environment and Reuse Foundation (WERF). The full set of sludge HTL testing data frommore » this effort will be documented in a separate report to be issued by WERF. This analysis is based on limited testing data and therefore should be considered preliminary. In addition, the testing was conducted with the goal of successful operation, and therefore does not represent an optimized process. Future refinements are necessary to improve the robustness of the model, including a cross-check of modeled biocrude components with the experimental GCMS data and investigation of equipment costs most appropriate at the relatively small scales used here. Environmental sustainability metrics analysis is also needed to understand the broader impact of this technology pathway. The base case scenario for the analysis consists of 10 HTL plants, each processing 100 dry U.S. ton/day (92.4 ton/day on a dry, ash-free basis) of sludge waste and producing 234 barrel per stream day (BPSD) biocrude, feeding into a centralized biocrude upgrading facility that produces 2,020 barrel per standard day of final fuel. This scale was chosen based upon initial wastewater treatment plant data collected by PNNL’s resource assessment team from the EPA’s Clean Watersheds Needs Survey database (EPA 2015a) and a rough estimate of what the potential sludge availability might be within a 100-mile radius. In addition, we received valuable feedback from the wastewater treatment industry as part of the WERF collaboration that helped form the basis for the selected HTL and upgrading plant scales and feedstock credit (current cost of disposal). It is assumed that the sludge is currently disposed of at $16.20/wet ton ($46/dry ton at 35% solids; $50/ton dry, ash-free basis) and this is included as a feedstock credit in the operating costs. The base case assumptions result in a minimum biocrude selling price of $3.8/gge and a minimum final upgraded fuel selling price of $4.9/gge. Several areas of process improvement and refinements to the analysis have the potential to significantly improve economics relative to the base case: •Optimization of HTL sludge feed solids content •Optimization of HTL biocrude yield •Optimization of HTL reactor liquid hourly space velocity (LHSV) •Optimization of fuel yield from hydrotreating •Combined large and small HTL scales specific to regions (e.g., metropolitan and suburban plants) Combined improvements believed to be achievable in these areas can potentially reduce the minimum selling price of biocrude and final upgraded fuel by about 50%. Further improvements may be possible through recovery of higher value components from the HTL aqueous phase, as being investigated under separate PNNL projects. Upgrading the biocrude at an existing petroleum refinery could also reduce the MFSP, although this option requires further testing to ensure compatibility and mitigation of risks to a refinery. And finally, recycling the HTL aqueous phase product stream back to the headworks of the WWTP (with no catalytic hydrothermal gasification treatment) can significantly reduce cost. This option is uniquely appropriate for application at a water treatment facility but also requires further investigation to determine any technical and economic challenges related to the extra chemical oxygen demand (COD) associated with the recycled water.« less

  8. International Space Station Sustaining Engineering: A Ground-Based Test Bed for Evaluating Integrated Environmental Control and Life Support System and Internal Thermal Control System Flight Performance

    NASA Technical Reports Server (NTRS)

    Ray, Charles D.; Perry, Jay L.; Callahan, David M.

    2000-01-01

    As the International Space Station's (ISS) various habitable modules are placed in service on orbit, the need to provide for sustaining engineering becomes increasingly important to ensure the proper function of critical onboard systems. Chief among these are the Environmental Control and Life Support System (ECLSS) and the Internal Thermal Control System (ITCS). Without either, life onboard the ISS would prove difficult or nearly impossible. For this reason, a ground-based ECLSS/ITCS hardware performance simulation capability has been developed at NASA's Marshall Space Flight Center. The ECLSS/ITCS Sustaining Engineering Test Bed will be used to assist the ISS Program in resolving hardware anomalies and performing periodic performance assessments. The ISS flight configuration being simulated by the test bed is described as well as ongoing activities related to its preparation for supporting ISS Mission 5A. Growth options for the test facility are presented whereby the current facility may be upgraded to enhance its capability for supporting future station operation well beyond Mission 5A. Test bed capabilities for demonstrating technology improvements of ECLSS hardware are also described.

  9. Test Capability Enhancements to the NASA Langley 8-Foot High Temperature Tunnel

    NASA Technical Reports Server (NTRS)

    Harvin, S. F.; Cabell, K. F.; Gallimore, S. D.; Mekkes, G. L.

    2006-01-01

    The NASA Langley 8-Foot High Temperature Tunnel produces true enthalpy environments simulating flight from Mach 4 to Mach 7, primarily for airbreathing propulsion and aerothermal/thermo-structural testing. Flow conditions are achieved through a methane-air heater and nozzles producing aerodynamic Mach numbers of 4, 5 or 7 and have exit diameters of 8 feet or 4.5 feet. The 12-ft long free-jet test section, housed inside a 26-ft vacuum sphere, accommodates large test articles. Recently, the facility underwent significant upgrades to support hydrocarbon fueled scramjet engine testing and to expand flight simulation capability. The upgrades were required to meet engine system development and flight clearance verification requirements originally defined by the joint NASA-Air Force X-43C Hypersonic Flight Demonstrator Project and now the Air Force X-51A Program. Enhancements to the 8-Ft. HTT were made in four areas: 1) hydrocarbon fuel delivery; 2) flight simulation capability; 3) controls and communication; and 4) data acquisition/processing. The upgrades include the addition of systems to supply ethylene and liquid JP-7 to test articles; a Mach 5 nozzle with dynamic pressure simulation capability up to 3200 psf, the addition of a real-time model angle-of-attack system; a new programmable logic controller sub-system to improve process controls and communication with model controls; the addition of MIL-STD-1553B and high speed data acquisition systems and a classified data processing environment. These additions represent a significant increase to the already unique test capability and flexibility of the facility, and complement the existing array of test support hardware such as a model injection system, radiant heaters, six-component force measurement system, and optical flow field visualization hardware. The new systems support complex test programs that require sophisticated test sequences and precise management of process fluids. Furthermore, the new systems, such as the real-time angle of attack system and the new programmable logic controller enhance the test efficiency of the facility. The motivation for the upgrades and the expanded capabilities is described here.

  10. X-ray intensity and source size characterizations for the 25 kV upgraded Manson source at Sandia National Laboratories

    NASA Astrophysics Data System (ADS)

    Loisel, G.; Lake, P.; Gard, P.; Dunham, G.; Nielsen-Weber, L.; Wu, M.; Norris, E.

    2016-11-01

    At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As the voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.

  11. Electron Accelerators for Research at the Frontiers of Nuclear Physics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartline, Beverly; Grunder, Hermann

    1986-10-01

    Electron accelerators for the frontiers of nuclear physics must provide high duty factor (gte 80) for coincidence measurements; few-hundred-MeV through few-GeV energy for work in the nucleonic, hadronic, and confinement regimes; energy resolution of ~ 10 -4; and high current (gte 100 zA). To fulfill these requirements new machines and upgrades of existing ones are being planned or constructed. Representative microtron-based facilities are the upgrade of MAMI at the University of Mainz (West Germany), the proposed two-stage cascade microtron at the University of Illinois (U.S.A.), and the three-stage Troitsk ``polytron'' (USSR). Representative projects to add pulse stretcher rings to existingmore » linacs are the upgrades at MIT-Bates (U.S.A.) and at NIKHEF-K (Netherlands). Recent advances in superconducting rf technology, especially in cavity design and fabrication, have made large superconducting cw linacs become feasible. Recirculating superconducting cw linacs are under construc« less

  12. Status of the SAGA Light Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaneyasu, T.; Takabayashi, Y.; Iwasaki, Y.

    The SAGA Light Source (SAGA-LS) is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring that is 75.6 m in circumference. The SAGA-LS has been stably providing synchrotron radiation to users since it first started user operation in February 2006. Along with the user operation, various machine improvements have been made over the past years, including upgrading the injector linac control system, replacing a septum magnet and constructing a beam diagnostic system. In addition to these improvements, insertion devices have been developed and installed. An APPLE-II type variable polarization undulator was installedmore » in 2008. To address the demand from users for high-flux hard x-rays, a superconducting 4 T class wiggler is being developed. An experimental setup for generating MeV photons by laser Compton scattering is being constructed for beam monitoring and future user experiments.« less

  13. The Cortex project A quasi-real-time information system to build control systems for high energy physics experiments

    NASA Astrophysics Data System (ADS)

    Barillere, R.; Cabel, H.; Chan, B.; Goulas, I.; Le Goff, J. M.; Vinot, L.; Willmott, C.; Milcent, H.; Huuskonen, P.

    1994-12-01

    The Cortex control information system framework is being developed at CERN. It offers basic functions to allow the sharing of information, control and analysis functions; it presents a uniform human interface for such information and functions; it permits upgrades and additions without code modification and it is sufficiently generic to allow its use by most of the existing or future control systems at CERN. Services will include standard interfaces to user-supplied functions, analysis, archive and event management. Cortex does not attempt to carry out the direct data acquisition or control of the devices; these are activities which are highly specific to the application and are best done by commercial systems or user-written programs. Instead, Cortex integrates these application-specific pieces and supports them by supplying other commonly needed facilities such as collaboration, analysis, diagnosis and user assistance.

  14. A Novel Approach to β-delayed Neutron Spectroscopy Using the Beta-decay Paul Trap

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scielzo, N.D., E-mail: scielzo1@llnl.gov; Yee, R.M.; Department of Nuclear Engineering, University of California, Berkeley, CA 94720

    A new approach to β-delayed neutron spectroscopy has been demonstrated that circumvents the many limitations associated with neutron detection by instead inferring the decay branching ratios and energy spectra of the emitted neutrons by studying the nuclear recoil. Using the Beta-decay Paul Trap, fission-product ions were trapped and confined to within a 1-mm{sup 3} volume under vacuum using only electric fields. Results from recent measurements of {sup 137}I{sup +} and plans for development of a dedicated ion trap for future experiments using the intense fission fragment beams from the Californium Rare Isotope Breeder Upgrade (CARIBU) facility at Argonne National Laboratorymore » are summarized. The improved nuclear data that can be collected is needed in many fields of basic and applied science such as nuclear energy, nuclear astrophysics, and stockpile stewardship.« less

  15. The lessons of SARS in Hong Kong.

    PubMed

    Lai, Thomas Sik To; Yu, Wai Cho

    2010-02-01

    Severe acute respiratory syndrome (SARS) is a novel coronavirus infection which broke out in Hong Kong in March 2003. Princess Margaret Hospital was designated to manage this new, mysterious and serious disease. Healthcare workers had to work under extremely stressful and often risky conditions to care for patients. Despite manpower and equipment reinforcements, staff infection occurred as a result of bodily exhaustion, working in an unfamiliar environment and lapses in infection control. Patients suffered even more, not only due to physical discomfort, but also because of the fear of isolation and death away from family and friends. Health authorities learnt their lessons in the outbreak and formulated emergency plans for future infectious disease epidemics. The healthcare infrastructure has been examined and upgraded with regard to intensive care capacity, infection control measures, professional training, manpower deployment, staff facilities, and stockpiling of drugs and personal protective equipment.

  16. Working Group Report: Higgs Boson

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dawson, Sally; Gritsan, Andrei; Logan, Heather

    2013-10-30

    This report summarizes the work of the Energy Frontier Higgs Boson working group of the 2013 Community Summer Study (Snowmass). We identify the key elements of a precision Higgs physics program and document the physics potential of future experimental facilities as elucidated during the Snowmass study. We study Higgs couplings to gauge boson and fermion pairs, double Higgs production for the Higgs self-coupling, its quantum numbers and $CP$-mixing in Higgs couplings, the Higgs mass and total width, and prospects for direct searches for additional Higgs bosons in extensions of the Standard Model. Our report includes projections of measurement capabilities frommore » detailed studies of the Compact Linear Collider (CLIC), a Gamma-Gamma Collider, the International Linear Collider (ILC), the Large Hadron Collider High-Luminosity Upgrade (HL-LHC), Very Large Hadron Colliders up to 100 TeV (VLHC), a Muon Collider, and a Triple-Large Electron Positron Collider (TLEP).« less

  17. Technical developments at the NASA Space Radiation Laboratory.

    PubMed

    Lowenstein, D I; Rusek, A

    2007-06-01

    The NASA Space Radiation Laboratory (NSRL) located at Brookhaven National Laboratory (BNL) is a center for space radiation research in both the life and physical sciences. BNL is a multidisciplinary research facility operated for the Office of Science of the US Department of Energy (DOE). The BNL scientific research portfolio supports a large and diverse science and technology program including research in nuclear and high-energy physics, material science, chemistry, biology, medial science, and nuclear safeguards and security. NSRL, in operation since July 2003, is an accelerator-based facility which provides particle beams for radiobiology and physics studies (Lowenstein in Phys Med 17(supplement 1):26-29 2001). The program focus is to measure the risks and to ameliorate the effects of radiation encountered in space, both in low earth orbit and extended missions beyond the earth. The particle beams are produced by the Booster synchrotron, an accelerator that makes up part of the injector sequence of the DOE nuclear physics program's Relativistic Heavy Ion Collider. Ion species from protons to gold are presently available, at energies ranging from <100 to >1,000 MeV/n. The NSRL facility has recently brought into operation the ability to rapidly switch species and beam energy to supply a varied spectrum onto a given specimen. A summary of past operation performance, plans for future operations and recent and planned hardware upgrades will be described.

  18. Optimizing charge breeding techniques for ISOL facilities in Europe: Conclusions from the EMILIE project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delahaye, P., E-mail: delahaye@ganil.fr; Jardin, P.; Maunoury, L.

    The present paper summarizes the results obtained from the past few years in the framework of the Enhanced Multi-Ionization of short-Lived Isotopes for Eurisol (EMILIE) project. The EMILIE project aims at improving the charge breeding techniques with both Electron Cyclotron Resonance Ion Sources (ECRIS) and Electron Beam Ion Sources (EBISs) for European Radioactive Ion Beam (RIB) facilities. Within EMILIE, an original technique for debunching the beam from EBIS charge breeders is being developed, for making an optimal use of the capabilities of CW post-accelerators of the future facilities. Such a debunching technique should eventually resolve duty cycle and time structuremore » issues which presently complicate the data-acquisition of experiments. The results of the first tests of this technique are reported here. In comparison with charge breeding with an EBIS, the ECRIS technique had lower performance in efficiency and attainable charge state for metallic ion beams and also suffered from issues related to beam contamination. In recent years, improvements have been made which significantly reduce the differences between the two techniques, making ECRIS charge breeding more attractive especially for CW machines producing intense beams. Upgraded versions of the Phoenix charge breeder, originally developed by LPSC, will be used at SPES and GANIL/SPIRAL. These two charge breeders have benefited from studies undertaken within EMILIE, which are also briefly summarized here.« less

  19. A 6He production facility and an electrostatic trap for measurement of the beta-neutrino correlation

    NASA Astrophysics Data System (ADS)

    Mukul, I.; Hass, M.; Heber, O.; Hirsh, T. Y.; Mishnayot, Y.; Rappaport, M. L.; Ron, G.; Shachar, Y.; Vaintraub, S.

    2018-08-01

    A novel experiment has been commissioned at the Weizmann Institute of Science for the study of weak interactions via a high-precision measurement of the beta-neutrinoangular correlation in the radioactive decay of short-lived 6He. The facility consists of a 14 MeV d + t neutron generator to produce atomic 6He, followed by ionization and bunching in an electron beam ion source, and injection into an electrostatic ion beam trap. This ion trap has been designed for efficient detection of the decay products from trapped light ions. The storage time in the trap for different stable ions was found to be in the range of 0.6 to 1.2 s at the chamber pressure of ∼7 × 10-10 mbar. We present the initial test results of the facility, and also demonstrate an important upgrade of an existing method (Stora et al., 2012) for production of light radioactive atoms, viz. 6He, for the precision measurement. The production rate of 6He atoms in the present setup has been estimated to be ∼ 1 . 45 × 10-4 atoms per neutron, and the system efficiency was found to be 4.0 ± 0.6%. An improvement to this setup is also presented for the enhanced production and diffusion of radioactive atoms for future use.

  20. Building a secondary containment system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Broder, M.F.

    1994-10-01

    Retail fertilizer and pesticide dealers across the United States are installing secondary containment at their facilities or are seriously considering it. Much of this work is in response to new state regulations; however, many dealers not facing new regulations are upgrading their facilities to reduce their liability, lower their insurance costs, or comply with anticipated regulations. The Tennessee Valley Authority`s (TVA) National Fertilizer and Environmental Research Center (NFERC) has assisted dealers in 22 states in retrofitting containment to their facilities. Simultaneous improvements in the operational efficiency of the facilities have been achieved at many of the sites. This paper ismore » based on experience gained in that work and details the rationale used in planning secondary containment and facility modifications.« less

  1. The Size and Scope of Collegiate Athletic Training Facilities and Staffing.

    PubMed

    Gallucci, Andrew R; Petersen, Jeffrey C

    2017-08-01

      Athletic training facilities have been described in terms of general design concepts and from operational perspectives. However, the size and scope of athletic training facilities, along with staffing at different levels of intercollegiate competition, have not been quantified.   To define the size and scope of athletic training facilities and staffing levels at various levels of intercollegiate competition. To determine if differences existed in facilities (eg, number of facilities, size of facilities) and staffing (eg, full time, part time) based on the level of intercollegiate competition.   Cross-sectional study.   Web-based survey.   Athletic trainers (ATs) who were knowledgeable about the size and scope of athletic training programs.   Athletic training facility size in square footage; the AT's overall facility satisfaction; athletic training facility component spaces, including satellite facilities, game-day facilities, offices, and storage areas; and staffing levels, including full-time ATs, part-time ATs, and undergraduate students.   The survey was completed by 478 ATs (response rate = 38.7%) from all levels of competition. Sample means for facilities were 3124.7 ± 4425 ft 2 (290.3 ± 411 m 2 ) for the central athletic training facility, 1013 ± 1521 ft 2 (94 ± 141 m 2 ) for satellite athletic training facilities, 1272 ± 1334 ft 2 (118 ± 124 m 2 ) for game-day athletic training facilities, 388 ± 575 ft 2 (36 ± 53 m 2 ) for athletic training offices, and 424 ± 884 ft 2 (39 ± 82 m 2 ) for storage space. Sample staffing means were 3.8 ± 2.5 full-time ATs, 1.6 ± 2.5 part-time ATs, 25 ± 17.6 athletic training students, and 6.8 ± 7.2 work-study students. Division I schools had greater resources in multiple categories (P < .001). Differences among other levels of competition were not as well defined. Expansion or renovation of facilities in recent years was common, and almost half of ATs reported that upgrades have been approved for the near future.   This study provides benchmark descriptive data on athletic training staffing and facilities. The results (1) suggest that the ATs were satisfied with their facilities and (2) highlight the differences in resources among competition levels.

  2. Transparent Armor Cost Benefit Study

    DTIC Science & Technology

    2007-03-06

    Armored HMMWVs (M1114s) 2003 2005 2006 UNCLASSIFIED UNCLASSIFIED 3/6/2007 4/17 2006 “Iraqi Pope Glass” 2004-2005 - GPK Recent HistoryEarly OIF Curb Wt...10,300lbs GVW: 12,100lbs UNCLASSIFIED UNCLASSIFIED 3/6/2007 5/17 Future Transparent Gun Shields Requirement: Upgrade GPKS with transparent armor for...enhanced situational awareness while maintaining soldier cover within armor envelope. AHI GS & GPK Upgraded Gunner Shield – Transparent Armored Gun

  3. The 64 meter antenna operation at K sub A band

    NASA Technical Reports Server (NTRS)

    Potter, P. D.

    1980-01-01

    The future potential of the 32 GHz K sub A band frequency region to planetary exploration, and the expected performance of the 64 m antenna network at 32 GHz is addressed. A modest level of noninterference upgrade work is assumed to achieve reasonable antenna aperture efficiency and alleviate antenna pointing difficulties. Electronic compensation of antenna aperture phasing errors is briefly considered as an alternative to the physical upgrade.

  4. Upgrades toward high-heat flux, liquid lithium plasma-facing components in the NSTX-U

    DOE PAGES

    Jaworski, M. A.; Brooks, A.; Kaita, R.; ...

    2016-08-08

    Liquid metal plasma-facing components (PFCs) provide numerous potential advantages over solid-material components. One critique of the approach is the relatively less developed technologies associated with deploying these components in a fusion plasma-experiment. Exploration of the temperature limits of liquid lithium PFCs in a tokamak divertor and the corresponding consequences on core operation are a high priority informing the possibilities for future liquid lithium PFCs. An all-metal NSTX-U is envisioned to make direct comparison between all high-Z wall operation and liquid lithium PFCs in a single device. By executing the all-metal upgrades incrementally, scientific productivity will be maintained while enabling physicsmore » and engineering-science studies to further develop the solid- and liquid-metal components. Six major elements of a flowing liquid-metal divertor system are described and a three-step program for implementing this system is laid out. The upgrade steps involve the first high-Z divertor target upgrade in NSTX-U, pre-filled liquid metal targets and finally, an integrated, flowing liquid metal divertor target. As a result, two example issues are described where the engineering and physics experiments are shown to be closely related in examining the prospects for future liquid metal PFCs.« less

  5. KSC-98pc1165

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis, being towed from the Shuttle Landing Facility, is reflected in waters from the Banana Creek next to the towway. The orbiter spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  6. Langley Aircraft Landing Dynamics Facility

    NASA Technical Reports Server (NTRS)

    Davis, Pamela A.; Stubbs, Sandy M.; Tanner, John A.

    1987-01-01

    The Langley Research Center has recently upgraded the Landing Loads Track (LLT) to improve the capability of low-cost testing of conventional and advanced landing gear systems. The unique feature of the Langley Aircraft Landing Dynamics Facility (ALDF) is the ability to test aircraft landing gear systems on actual runway surfaces at operational ground speeds and loading conditions. A historical overview of the original LLT is given, followed by a detailed description of the new ALDF systems and operational capabilities.

  7. Environmental Assessment:Security and Safety Upgrades to Entry Control Facilities Vandenberg Air Force Base, California

    DTIC Science & Technology

    2009-07-08

    meters; noisy urban daytime 70 – 80 Shouting at one meter; vacuum cleaner at three meters Gas lawnmower at 30 meters 60 – 70 Normal speech at one...military and political leaders during the Cold War. Since the National Aeronautics and Space Administration ( NASA ) was established in 1958, the...Preservation Needs with the Operation of Highly Technical or Scientific Facilities, specifically refers to the many active NASA and U.S. Air Force

  8. KSC-00PADIG-020

    NASA Image and Video Library

    2002-05-02

    This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400-acre Commerce Park.

  9. Assessing Spectral Shortwave Cloud Observations at the Southern Great Plains Facility

    NASA Technical Reports Server (NTRS)

    McBride, P. J.; Marshak, A.; Wiscombe, W. J.; Flynn, C. J.; Vogelmann, A. M.

    2012-01-01

    The Atmospheric Radiation Measurement (ARM) program (now Atmospheric System Research) was established, in part, to improve radiation models so that they could be used reliably to compute radiation fluxes through the atmosphere, given knowledge of the surface albedo, atmospheric gases, and the aerosol and cloud properties. Despite years of observations, discrepancies still exist between radiative transfer models and observations, particularly in the presence of clouds. Progress has been made at closing discrepancies in the spectral region beyond 3 micron, but the progress lags at shorter wavelengths. Ratios of observed visible and near infrared cloud albedo from aircraft and satellite have shown both localized and global discrepancies between model and observations that are, thus far, unexplained. The capabilities of shortwave surface spectrometry have been improved in recent years at the Southern Great Plains facility (SGP) of the ARM Climate Research Facility through the addition of new instrumentation, the Shortwave Array Spectroradiometer, and upgrades to existing instrumentation, the Shortwave Spectroradiometer and the Rotating Shadowband Spectroradiometer. An airborne-based instrument, the HydroRad Spectroradiometer, was also deployed at the ARM site during the Routine ARM Aerial Facility Clouds with Low Optical Water Depths (CLOWD) Optical Radiative Observations (RACORO) field campaign. Using the new and upgraded spectral observations along with radiative transfer models, cloud scenes at the SGP are presented with the goal of characterizing the instrumentation and the cloud fields themselves.

  10. The National Center for Oncological Hadron Therapy: status of the project and future clinical use of the facility.

    PubMed

    Orecchia, Roberto; Fossati, Piero; Rossi, Sandro

    2009-01-01

    Hadron therapy is an advanced radiotherapy technique that employs charged particle beams. Several particles (pions, oxygen, neon and helium ions) have been investigated in the past, but at present only protons and carbon ions are used in clinical practice. Hadron therapy has been used for more than 50 years, more than 50,000 patients have been treated worldwide, and many new facilities are being built. Indications are still a matter of debate. The Italian National Center for Oncological Hadron Therapy (CNAO) is under construction in Pavia and will begin to treat patients in the near future. The CNAO will be a center capable of using both protons and carbon ions. In the first phase, three rooms with vertical and horizontal fixed beams will be available, subsequently the center will be upgraded with two more rooms equipped with a rotating gantry. The facility will use active scanning delivery systems and state-of-the-art immobilization and setup verification devices. One additional room will be devoted to physical and radiobiological research. The CNAO will be a high-patient-throughput facility capable of treating more than 3,000 patients per year. Seven areas of interest have been identified: lung cancer, liver cancer, head and neck malignancies, pediatric solid cancers, eye tumors, sarcoma and central nervous system cancers. A disease-specific working group has been created for each area and has defined selection criteria and protocols to be used at the CNAO. Two more working groups are being set up on gynecological and digestive (pancreas, biliary tract and rectum) tumors. All the patients will participate in clinical trials to establish with sound evidence the real indications for hadron therapy. National and international cooperation networks are being set up to facilitate patient referral and follow-up. A medical service is already operative to assist patients and in selected case to refer them abroad. The CNAO will be the only carbon ion facility in Italy and will have an international basin. Close cooperation with existing oncological centers is of paramount importance to fully exploit its potential.

  11. Fermilab | OCSR | Home

    Science.gov Websites

    Upgrade Project Fermilab Campus Master Plan Fermilab Campus & Facilities Planning Board Fermilab Chief Operations Officer, leads development of campus master planning and the associated execution of a program. The Campus Strategy identifies projects over a ten-year planning horizon to meet the projected

  12. 76 FR 12405 - Notice of Passenger Facility Charge (PFC) Approvals and Disapprovals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-07

    .... Mandatory pavement markings. Airport signage. Runway guard lights. Wildlife study. PFC application.... Runway 18/36 pavement maintenance. Runway 13/31 pavement maintenance. PFC administration fees. Brief... Use: Tractor with snow blower and snow plow. Airport security and access control upgrades--design...

  13. Avoiding the Energy Crunch.

    ERIC Educational Resources Information Center

    Rowland, Dave

    2001-01-01

    Explores strategies for upgrading facility energy equipment that can cut energy costs and help substantially cover the costs of capital asset improvements. Discusses use of performance contracts to help schools leverage their operating budgets. Highlights how energy savings helped one school district finance $9.4 million in retrofits. (GR)

  14. Paying for It

    ERIC Educational Resources Information Center

    Ullman, Ellen

    2011-01-01

    Construction on community college campuses is often paid for out of general capital or operations budgets or by way of taxpayer-approved bonds. But, as state and local money becomes increasingly scarce, many colleges, while still pursuing traditional funding sources, are also considering alternative strategies to support facilities upgrades on…

  15. Considerations When Upgrading and Renovating Window Systems

    ERIC Educational Resources Information Center

    Gille, Steve

    2010-01-01

    Today's educational facilities managers face many challenges. As stewards of their campus' physical assets, these professionals are charged with improving students' learning environments, saving money, and maintaining the historical and aesthetic integrity of their buildings. For schools and universities that have not replaced their windows in…

  16. 48 CFR 611.602 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... involving the security of overseas posts. The DOSESPP includes a wide range of elements of both physical and... security upgrade. This includes installation of forced entry/ballistic resistant (FE/BR) windows and doors...) Forced entry/ballistic resistant (FE/BR) components. This includes doors, windows, and related facilities...

  17. Rapidly expanding mobile apps for crowd-sourcing bike data to new cities : final report.

    DOT National Transportation Integrated Search

    2017-03-01

    Cities such as San Francisco, Atlanta, and Portland are using novel methods of data collection to learn more about the use of their bicycle : infrastructure. These data can help transportation planners better design or upgrade bicycle facilities. San...

  18. Upgrade to the Birmingham Irradiation Facility

    NASA Astrophysics Data System (ADS)

    Dervan, P.; French, R.; Hodgson, P.; Marin-Reyes, H.; Parker, K.; Wilson, J.; Baca, M.

    2015-10-01

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 1015 (1 MeV neutron equivalent (neq)) cm-2 in 80 s with proton beam currents of 1 μA and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of -50 °C in 30 min and aims to maintain sub-0 °C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and performance of the new cooling system.

  19. Thermostructural characterization and structural elastic property optimization of novel high luminosity LHC collimation materials at CERN

    NASA Astrophysics Data System (ADS)

    Borg, M.; Bertarelli, A.; Carra, F.; Gradassi, P.; Guardia-Valenzuela, J.; Guinchard, M.; Izquierdo, G. Arnau; Mollicone, P.; Sacristan-de-Frutos, O.; Sammut, N.

    2018-03-01

    The CERN Large Hadron Collider is currently being upgraded to operate at a stored beam energy of 680 MJ through the High Luminosity upgrade. The LHC performance is dependent on the functionality of beam collimation systems, essential for safe beam cleaning and machine protection. A dedicated beam experiment at the CERN High Radiation to Materials facility is created under the HRMT-23 experimental campaign. This experiment investigates the behavior of three collimation jaws having novel composite absorbers made of copper diamond, molybdenum carbide graphite, and carbon fiber carbon, experiencing accidental scenarios involving the direct beam impact on the material. Material characterization is imperative for the design, execution, and analysis of such experiments. This paper presents new data and analysis of the thermostructural characteristics of some of the absorber materials commissioned within CERN facilities. In turn, characterized elastic properties are optimized through the development and implementation of a mixed numerical-experimental optimization technique.

  20. A microprocessor tester for the treat upgrade reactor trip system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenkszus, F.R.; Bucher, R.G.

    1985-02-01

    The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. To improve the analytical extrapolation of test results to full-size assembly bundles, the facility upgrade will increase the maximum size of the test bundle from 7 to 37 fuel pins. By creating a core convertor zone around the test location, the neutron spectrum incident on the test assembly will be hardened and the maximum energy deposited in the sample will be increased. In addition, a programmable Automated Reactor Control System (ARCS) willmore » permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety system is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations. A quantitative reliability analysis of the RTS shows that the unreliability, that is, the probability of failure, is acceptable for a 10 hour mission time or risk interval.« less

  1. VISIR upgrade overview: all's well that ends well

    NASA Astrophysics Data System (ADS)

    Kerber, Florian; Käufl, Hans Ulrich; Tristram, Konrad; Asmus, Daniel; Baksai, Pedro; Di Lieto, Nicola; Dobrzycka, Danuta; Duhoux, Philippe; Finger, Gert; Hummel, Christian; Ives, Derek; Jakob, Gerd; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Pantin, Eric; Riquelme, Miguel; Sanchez, Joel; Sandrock, Stefan; Siebenmorgen, Ralf; Stegmeier, Jörg; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Valdes, Guillermo; Venema, Lars

    2016-08-01

    We present an overview of the VISIR instrument after its upgrade and return to science operations. VISIR is the midinfrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan was based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As AQUARIUS detector array manufactured by Raytheon. In addition, a new prism spectroscopic mode covers the whole N-band in a single observation. Finally, new scientific capabilities for high resolution and high-contrast imaging are offered by sub-aperture mask and coronagraphic modes. In order to make optimal use of favourable atmospheric conditions, a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a user-defined constraint on water vapour. During the commissioning in 2012, it was found that the on-sky sensitivity of the AQUARIUS detector was significantly below expectations. Extensive testing of the detector arrays in the laboratory and on-sky enabled us to diagnose the cause for the shortcoming of the detector as excess low frequency noise. It is inherent to the design chosen for this detector and cannot be remedied by changing the detector set-up. Since this is a form of correlated noise, its impact can be limited by modulating the scene recorded by the detector. After careful analysis, we have implemented fast (up to 4 Hz) chopping with field stabilization using the secondary mirror of the VLT. During commissioning, the upgraded VISIR has been confirmed to be more sensitive than the old instrument, and in particular for low-resolution spectroscopy in the N-band, a gain of a factor 6 is realized in observing efficiency. After overcoming several additional technical problems, VISIR is back in Science Operations since April 2015. In addition an upgrade of the IT infrastructure related to VISIR has been conducted in order to support burst-mode operations. Science Verification of the new modes was performed in Feb 2016. The upgraded VISIR is a powerful instrument providing close to background limited performance for diffraction-limited observations at an 8-m telescope. It offers synergies with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey works like WISE. In addition, it will bring confirmation of the technical readiness and scientific value of several aspects for future mid-IR instrumentation at Extremely Large Telescopes. We also present several lessons learned during the project.

  2. A Critical Assessment of Microbiological Biogas to Biomethane Upgrading Systems.

    PubMed

    Rittmann, Simon K-M R

    2015-01-01

    Microbiological biogas upgrading could become a promising technology for production of methane (CH(4)). This is, storage of irregular generated electricity results in a need to store electricity generated at peak times for use at non-peak times, which could be achieved in an intermediate step by electrolysis of water to molecular hydrogen (H(2)). Microbiological biogas upgrading can be performed by contacting carbon dioxide (CO(2)), H(2) and hydrogenotrophic methanogenic Archaea either in situ in an anaerobic digester, or ex situ in a separate bioreactor. In situ microbiological biogas upgrading is indicated to require thorough bioprocess development, because only low volumetric CH(4) production rates and low CH(4) fermentation offgas content have been achieved. Higher volumetric production rates are shown for the ex situ microbiological biogas upgrading compared to in situ microbiological biogas upgrading. However, the ex situ microbiological biogas upgrading currently suffers from H(2) gas liquid mass transfer limitation, which results in low volumetric CH(4) productivity compared to pure H(2)/CO(2) conversion to CH(4). If waste gas utilization from biological and industrial sources can be shown without reduction in volumetric CH(4) productivity, as well as if the aim of a single stage conversion to a CH(4) fermentation offgas content exceeding 95 vol% can be demonstrated, ex situ microbiological biogas upgrading with pure or enrichment cultures of methanogens could become a promising future technology for almost CO(2)-neutral biomethane production.

  3. Muon Physics at Run-I and its upgrade plan

    NASA Astrophysics Data System (ADS)

    Benekos, Nektarios Chr.

    2015-05-01

    The Large Hadron Collider (LHC) and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC) project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb-1 expected for LHC running to 3000 fb-1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  4. Application, Deactivation, and Regeneration of Heterogeneous Catalysts in Bio-Oil Upgrading

    DOE PAGES

    Cheng, Shouyun; Wei, Lin; Zhao, Xianhui; ...

    2016-12-07

    The massive consumption of fossil fuels and associated environmental issues are leading to an increased interest in alternative resources such as biofuels. The renewable biofuels can be upgraded from bio-oils that are derived from biomass pyrolysis. Catalytic cracking and hydrodeoxygenation (HDO) are two of the most promising bio-oil upgrading processes for biofuel production. Heterogeneous catalysts are essential for upgrading bio-oil into hydrocarbon biofuel. Although advances have been achieved, the deactivation and regeneration of catalysts still remains a challenge. This review focuses on the current progress and challenges of heterogeneous catalyst application, deactivation, and regeneration. The technologies of catalysts deactivation, reduction,more » and regeneration for improving catalyst activity and stability are discussed. Some suggestions for future research including catalyst mechanism, catalyst development, process integration, and biomass modification for the production of hydrocarbon biofuels are provided.« less

  5. Application, Deactivation, and Regeneration of Heterogeneous Catalysts in Bio-Oil Upgrading

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheng, Shouyun; Wei, Lin; Zhao, Xianhui

    The massive consumption of fossil fuels and associated environmental issues are leading to an increased interest in alternative resources such as biofuels. The renewable biofuels can be upgraded from bio-oils that are derived from biomass pyrolysis. Catalytic cracking and hydrodeoxygenation (HDO) are two of the most promising bio-oil upgrading processes for biofuel production. Heterogeneous catalysts are essential for upgrading bio-oil into hydrocarbon biofuel. Although advances have been achieved, the deactivation and regeneration of catalysts still remains a challenge. This review focuses on the current progress and challenges of heterogeneous catalyst application, deactivation, and regeneration. The technologies of catalysts deactivation, reduction,more » and regeneration for improving catalyst activity and stability are discussed. Some suggestions for future research including catalyst mechanism, catalyst development, process integration, and biomass modification for the production of hydrocarbon biofuels are provided.« less

  6. Good Performers

    ERIC Educational Resources Information Center

    Bennett, Bob

    2009-01-01

    Soaring energy prices and tightening school budgets don't mix well. In fact, millions of children across the United States are being educated in energy-leaking, unhealthful facilities in dire need of physical upgrade and systems modernization. Increasing numbers of K-12 districts and institutions of higher learning are turning to performance-based…

  7. Changes in growth rates in Mercenaria mercenaria in Narragansett Bay

    EPA Science Inventory

    The state of Rhode Island has taken several measures to reduce nitrogen (N) added to Narragansett Bay and waters leading to the Bay. These include upgrading wastewater treatment facilities to tertiary treatment and increasing the holding capacity of storm water to prevent storm r...

  8. Expanding Sports Facilities.

    ERIC Educational Resources Information Center

    Koger, Dale

    2001-01-01

    Explains how colleges and universities can increase revenue and enhance status by upgrading their stadiums and arenas. Related issues considered are: determining how much a school should add to its existing stadium and arena, selecting the design and management team, and raising capital. Outlines key areas that design and construction teams should…

  9. Decommissioning the Romanian Water-Cooled Water-Moderated Research Reactor: New Environmental Perspective on the Management of Radioactive Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barariu, G.; Giumanca, R.

    2006-07-01

    Pre-feasibility and feasibility studies were performed for decommissioning of the water-cooled water-moderated research reactor (WWER) located in Bucharest - Magurele, Romania. Using these studies as a starting point, the preferred safe management strategy for radioactive wastes produced by reactor decommissioning is outlined. The strategy must account for reactor decommissioning, as well as for the rehabilitation of the existing Radioactive Waste Treatment Plant and for the upgrade of the Radioactive Waste Disposal Facility at Baita-Bihor. Furthermore, the final rehabilitation of the laboratories and ecological reconstruction of the grounds need to be provided for, in accordance with national and international regulations. Inmore » accordance with IAEA recommendations at the time, the pre-feasibility study proposed three stages of decommissioning. However, since then new ideas have surfaced with regard to decommissioning. Thus, taking into account the current IAEA ideology, the feasibility study proposes that decommissioning of the WWER be done in one stage to an unrestricted clearance level of the reactor building in an Immediate Dismantling option. Different options and the corresponding derived preferred option for waste management are discussed taking into account safety measures, but also considering technical, logistical and economic factors. For this purpose, possible types of waste created during each decommissioning stage are reviewed. An approximate inventory of each type of radioactive waste is presented. The proposed waste management strategy is selected in accordance with the recommended international basic safety standards identified in the previous phase of the project. The existing Radioactive Waste Treatment Plant (RWTP) from the Horia Hulubei Institute for Nuclear Physics and Engineering (IFIN-HH), which has been in service with no significant upgrade since 1974, will need refurbishing due to deterioration, as well as upgrading in order to ensure the plant complies with current safety standards. This plant will also need to be adapted to treat wastes generated by WWER dismantling. The Baita-Bihor National Radioactive Waste Disposal Facility consists of two galleries in an abandoned uranium mine located in the central-western part of the Bihor Mountains in Transylvania. The galleries lie at a depth of 840 m. The facility requires a considerable overhaul. Several steps recommended for the upgrade of the facility are explored. Environmental concerns have lately become a crucial part of the radioactive waste management strategy. As such, all decisions must be made with great regard for land utilization around nuclear objectives. (authors)« less

  10. Artist rendition of the planned Space Experiment Research and Processing Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The preliminary design for the Space Experiment Research and Processing Laboratory (SERPL) at Kennedy Space Center is shown in this artist's rendition. The SERPL is a planned 100,000-square- foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for a planned 400-acre Space Station Commerce Park.

  11. Location for the planned Space Experiment Research and Processing Laboratory

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This diagram shows the planned locations of the Space Experiment Research and Processing Laboratory (SERPL) and the Space Station Commerce Park at Kennedy Space Center. The SERPL is a planned 100,000-square-foot laboratory that will provide expanded and upgraded facilities for hosting International Space Station experiment processing. In addition, it will provide better support for other biological and life sciences payload processing at KSC. It will serve as a magnet facility for the planned 400- acre commerce park.

  12. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current Avaya phone system with a Cisco Unified Communications phone system. The Cisco system is already in use at the Advanced Technology Research Facility (ATRF).

  13. Subsonic Transonic Applied Refinements By Using Key Strategies - STARBUKS In the NASA Langley Research Center National Transonic Facility

    NASA Technical Reports Server (NTRS)

    Paryz, Roman W.

    2014-01-01

    Several upgrade projects have been completed at the NASA Langley Research Center National Transonic Facility over the last 1.5 years in an effort defined as STARBUKS - Subsonic Transonic Applied Refinements By Using Key Strategies. This multi-year effort was undertaken to improve NTF's overall capabilities by addressing Accuracy and Validation, Productivity, and Reliability areas at the NTF. This presentation will give a brief synopsis of each of these efforts.

  14. Next-generation laser retroreflectors for GNSS, solar system exploration, geodesy, gravitational physics and earth observation

    NASA Astrophysics Data System (ADS)

    Dell'Agnello, S.; Boni, A.; Cantone, C.; Ciocci, E.; Martini, M.; Patrizi, G.; Tibuzzi, M.; Delle Monache, G.; Vittori, R.; Bianco, G.; Currie, D.; Intaglietta, N.; Salvatori, L.; Lops, C.; Contessa, S.; Porcelli, L.; Mondaini, C.; Tuscano, P.; Maiello, M.

    2017-11-01

    The SCF_Lab (Satellite/lunar/gnss laser ranging and altimetry Characterization Facility Laboratory) of INFNLNF is designed to cover virtually LRAs (Laser Retroreflector Arrays) of CCRs (Cube Corner Retroreflectors) for missions in the whole solar system, with a modular organization of its instrumentation, two redundant SCF (SCF_Lab Characterization Facilities), and an evolutionary measurement approach, including customization and potentially upgrade on-demand. See http://www.lnf.infn.it/esperimenti/etrusco/ for a general description.

  15. Proceedings of the nineteenth LAMPF Users Group meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradbury, J.N.

    1986-02-01

    Separate abstracts were prepared for eight invited talks on various aspects of nuclear and particle physics as well as status reports on LAMPF and discussions of upgrade options. Also included in these proceedings are the minutes of the working groups for: energetic pion channel and spectrometer; high resolution spectrometer; high energy pion channel; neutron facilities; low-energy pion work; nucleon physics laboratory; stopped muon physics; solid state physics and material science; nuclear chemistry; and computing facilities. Recent LAMPF proposals are also briefly summarized. (LEW)

  16. NEP technology: FY 1992 milestones (NASA LeRC)

    NASA Technical Reports Server (NTRS)

    Sovey, Jim

    1993-01-01

    A discussion of Nuclear Electric Propulsion (NEP) thrusters and facilities is presented in vugraph form. The NEP thrusters are discussed in the context of the following three items: (1) establishing a 100 H test capability for 100-kW magnetoplasmadynamic (MPD) thrusters; (2) demonstrating a lightweight 20-kW krypton ion thruster; and (3) the optimization of the design of low-mass power processor transformers. The primary accomplishment at NEP facilities was the completion of the Electric Propulsion Laboratory's (EPL's) tank 5 cryopump upgrade.

  17. The aerospace energy systems laboratory: Hardware and software implementation

    NASA Technical Reports Server (NTRS)

    Glover, Richard D.; Oneil-Rood, Nora

    1989-01-01

    For many years NASA Ames Research Center, Dryden Flight Research Facility has employed automation in the servicing of flight critical aircraft batteries. Recently a major upgrade to Dryden's computerized Battery Systems Laboratory was initiated to incorporate distributed processing and a centralized database. The new facility, called the Aerospace Energy Systems Laboratory (AESL), is being mechanized with iAPX86 and iAPX286 hardware running iRMX86. The hardware configuration and software structure for the AESL are described.

  18. Multi-axis transient vibration testing of space objects: Test philosophy, test facility, and control strategy

    NASA Technical Reports Server (NTRS)

    Lachenmayr, Georg

    1992-01-01

    IABG has been using various servohydraulic test facilities for many years for the reproduction of service loads and environmental loads on all kinds of test objects. For more than 15 years, a multi-axis vibration test facility has been under service, originally designed for earthquake simulation but being upgraded to the demands of space testing. First tests with the DFS/STM showed good reproduction accuracy and demonstrated the feasibility of transient vibration testing of space objects on a multi-axis hydraulic shaker. An approach to structural qualification is possible by using this test philosophy. It will be outlined and its obvious advantages over the state-of-the-art single-axis test will be demonstrated by example results. The new test technique has some special requirements to the test facility exceeding those of earthquake testing. Most important is the high reproduction accuracy demanded for a sophisticated control system. The state-of-the-art approach of analog closed-loop control circuits for each actuator combined with a static decoupling network and an off-line iterative waveform control is not able to meet all the demands. Therefore, the future over-all control system is implemented as hierarchical full digital closed-loop system on a highly parallel transputer network. The innermost layer is the digital actuator controller, the second one is the MDOF-control of the table movement. The outermost layer would be the off-line iterative waveform control, which is dedicated only to deal with the interaction of test table and test object or non-linear effects. The outline of the system will be presented.

  19. A scalable and continuous-upgradable optical wireless and wired convergent access network.

    PubMed

    Sung, J Y; Cheng, K T; Chow, C W; Yeh, C H; Pan, C-L

    2014-06-02

    In this work, a scalable and continuous upgradable convergent optical access network is proposed. By using a multi-wavelength coherent comb source and a programmable waveshaper at the central office (CO), optical millimeter-wave (mm-wave) signals of different frequencies (from baseband to > 100 GHz) can be generated. Hence, it provides a scalable and continuous upgradable solution for end-user who needs 60 GHz wireless services now and > 100 GHz wireless services in the future. During the upgrade, user only needs to upgrade their optical networking unit (ONU). A programmable waveshaper is used to select the suitable optical tones with wavelength separation equals to the desired mm-wave frequency; while the CO remains intact. The centralized characteristics of the proposed system can easily add any new service and end-user. The centralized control of the wavelength makes the system more stable. Wired data rate of 17.45 Gb/s and w-band wireless data rate up to 3.36 Gb/s were demonstrated after transmission over 40 km of single-mode fiber (SMF).

  20. Elliptical superconducting RF cavities for FRIB energy upgrade

    NASA Astrophysics Data System (ADS)

    Ostroumov, P. N.; Contreras, C.; Plastun, A. S.; Rathke, J.; Schultheiss, T.; Taylor, A.; Wei, J.; Xu, M.; Xu, T.; Zhao, Q.; Gonin, I. V.; Khabiboulline, T.; Pischalnikov, Y.; Yakovlev, V. P.

    2018-04-01

    The multi-physics design of a five cell, βG = 0 . 61, 644 MHz superconducting elliptical cavity being developed for an energy upgrade in the Facility for Rare Isotope Beams (FRIB) is presented. The FRIB energy upgrade from 200 MeV/u to 400 MeV/u for heaviest uranium ions will increase the intensities of rare isotope beams by nearly an order of magnitude. After studying three different frequencies, 1288 MHz, 805 MHz, and 644 MHz, the 644 MHz cavity was shown to provide the highest energy gain per cavity for both uranium and protons. The FRIB upgrade will include 11 cryomodules containing 5 cavities each and installed in 80-meter available space in the tunnel. The cavity development included extensive multi-physics optimization, mechanical and engineering analysis. The development of a niobium cavity is complete and two cavities are being fabricated in industry. The detailed design of the cavity sub-systems such as fundamental power coupler and dynamic tuner are currently being pursued. In the overall design of the cavity and its sub-systems we extensively applied experience gained during the development of 650 MHz low-beta cavities at Fermi National Accelerator Laboratory (FNAL) for the Proton Improvement Plan (PIP) II.

  1. Upgrades to the LLNL flash x-ray induction linear accelerator (FXR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scarpetti, R. D., LLNL

    1997-06-30

    The FXR is an induction linear accelerator used for flash radiography at the Lawrence Livermore National Laboratory's Site 300 Test Facility. The FXR was originally completed in 1982 and has been in continuous use as a radiographic tool. At that time the FXR produced a 17MeV, 2.2 kA burst of electrons for a duration of 65 ns. An upgrade of the FXR was recently completed. The purpose of this upgrade was to improve the performance of the FXR by increasing the energy of the electron injector from 1.2 MeV to 2.5 MeV and the beam current from 2.2 kA tomore » 3 kA, improving the magnetic transport system by redesigning the solenoidal transport focus coils, reducing the rf coupling of the electron beam to the accelerator cells, and by adding additional beam diagnostics. We will describe the injector upgrades and performance as well as our efforts to tune the accelerator by minimizing beam corkscrew motion and the impact of Beam Breakup Instability on beam centroid motion throughout the beam line as the current is increased to 3 kA.« less

  2. First Results From the (Multibeam) Hydrosweep DS2 Upgrade on the R/V Maurice Ewing

    NASA Astrophysics Data System (ADS)

    Chayes, D. N.; Slagle, A.; Caress, D. W.; Arko, R. A.

    2001-12-01

    The ATLAS Hydrosweep DS multibeam swath mapping sonar system on the R/V Maurice Ewing was upgraded to a DS2 in May 2000. This upgrade increased the effective swath width from 59 beams over about 89 degrees to as many as 140 beams over approximately 118 degrees, added sidescan image as well as data records from which backscatter can be extracted. The upgrade replaced the outdated processing computer, half-inch tape drive and console with modern workstations and 4mm tape. The upgrade did not require changes to the under hull transducer arrays or transceivers so it was relatively inexpensive and was accomplished in a few days during a transit of the Panama Canal. Evaluation and software enhancements were done during subsequent transits. MB-System was enhanced to support the native, raw data format of the Hydrosweep DS2. We also expect to be able to support the more general SURF format that is also generated by new ATLAS sonar systems in the near future. In addition to the hardware and software upgrades to the multibeam, we installed a POS/MV-320 vertical reference system to take over from our venerable HIPPY-120 as the primary attitude reference for the Hydrosweep on the Ewing. The attitude data from the POS has allowed us to eliminate the turn rate restrictions and to improve the data quality. As an additional benefit the P-Code aided position data produced by the POS is significantly more stable and better behaved than our other navigation sources. The upgraded sonar was used during EW0108 (Taylor) in the Gulf of Corinth. As is usually the case with new implementations or modifications of complex systems, some unexpected behaviors were observed and carefully documented. Good remote support from the manufacturer enabled us to implement fixes and to generate very good quality bathymetry and sidescan images on board and in shore-side post processing. Two related software prototypes are currently being evaluated as part of this upgrade package. One is a web-based real-time watch standers logbook that facilitates the entry of standard log information directly into a relational database (rather than by hand on paper forms.) The second is a relational database that contains the FGDC metadata for multibeam swath bathymetry. This initial upgrade to our Hydrosweep establishes a stable base from which we expect to evolve significant new capabilities in the future. Some of these capabilities will be based on the unique cross fan capabilities of the Hydrosweep design.

  3. 78 FR 42062 - Columbia Gas Transmission, LLC; Notice of Intent to Prepare an Environmental Assessment and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-15

    ... facilities: New compressor station (Redd Farm Compressor Station) on Columbia's existing Line 1570 in... setting; Modifications to the Smithfield Compressor Station consisting of upgrades to the existing... coolers; Modifications to the Glenville Compressor Station by installing two gas-fired turbines, each...

  4. Developing a Comprehensive Housing Strategy: A Case Study

    ERIC Educational Resources Information Center

    Marsters, Tim; Bliss, Kelly

    2007-01-01

    In the current highly competitive higher education market in North America, many colleges have identified the importance of upgrading their existing residential housing facilities as part of their strategy to attract and retain students. The case study discussed in this article describes the successful planning process used by Perkins+Will and…

  5. TECHNOLOGIES FOR UPGRADING EXISTING OR DESIGNING NEW DRINKING WATER TREATMENT FACILITIES

    EPA Science Inventory

    The publication compiles material presented at a series of workshops and helps to focus attention on the many treatment and disinfection decisions that will be facing both ground water and surface source systems over the next several years, as implementation of the 1986 Safe Drin...

  6. Automate Your Physical Plant Using the Building Block Approach.

    ERIC Educational Resources Information Center

    Michaelson, Matt

    1998-01-01

    Illustrates how Mount Saint Vincent University (Halifax), by upgrading the control and monitoring of one building or section of the school at a time, could produce savings in energy and operating costs and improve the environment. Explains a gradual, "building block" approach to facility automation that provides flexibility without a…

  7. Crew Quarters Modifications

    NASA Image and Video Library

    2018-03-30

    Modifications and upgrades are underway inside the Astronaut Crew Quarters in the Neil Armstrong Operations and Checkout Building at NASA's Kennedy Space Center in Florida. The crew quarters are being prepared for the next generation of space explorers. The historic facility housed Apollo and space shuttle astronauts before and after their missions into space.

  8. Energy dissipation for flat-sloped stepped spillways using new inception point relationship

    USDA-ARS?s Scientific Manuscript database

    Transforming from a rural to an urban landscape has created a change in hazard classification for many earthen embankments. As a result, these facilities provide inadequate spillway capacity for the upgraded hazard rating. To bring these dams into compliance with state and federal dam safety regul...

  9. The Way We Ask Now

    ERIC Educational Resources Information Center

    DiConsiglio, John

    2010-01-01

    Since the recession struck in late 2008, fundraising has become a minefield, and even the steadiest advancement officers are unsure of their steps. For years, education fundraisers heard yes from donor after donor. Yes to large gifts. Yes to endowment boosts. Yes to scholarships and athletic facility upgrades. In the 2008 fiscal year, educational…

  10. Looking for Trouble

    ERIC Educational Resources Information Center

    Rice, Mike

    2006-01-01

    Circuit breakers are the linchpin of an institution's power-distribution system, so it's not surprising that several warning signs of an aging system relate to these devices. When warning signs occur, it's a message to facilities managers and administrators that breakers may need to be upgraded to help the power distribution system meet existing…

  11. Enough to Go 'Round? Thinking Smart about Total Cost of Ownership

    ERIC Educational Resources Information Center

    McIntire, Todd

    2006-01-01

    Total cost of ownership or TCO refers to the life cycle of costs for technology, including both direct and indirect expenses. TCO includes costs incurred by capital (hardware, software, and facilities); administration and operation (planning, upgrade, replacement, and technical support); and end-user operation (staff development and user…

  12. The Contemporary Student Center: Challenges at Metropolitan Universities

    ERIC Educational Resources Information Center

    Henry, Wilma J.

    2004-01-01

    As the student center movement--to upgrade, expand, or acquire a new facility--continues in the new millennium, metropolitan institutions, in particular, are finding that their unique circumstances often challenge their ability to keep pace with their nonmetropolitan counterparts. This research presents the results of a study of the role of…

  13. 40 CFR 35.3520 - Systems, projects, and project-related costs eligible for assistance from the Fund.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... or upgrade of eligible storage facilities, including finished water reservoirs, to prevent... undertake feasible and appropriate changes in operations to ensure compliance over the long-term. (3... development strategy. (3) Reservoirs or rehabilitation of reservoirs, except for finished water reservoirs and...

  14. USDA and Florida Power & Light Company Successfully Save $85K/year with UESC Collaboration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Case study features the U.S. Department of Agriculture's (USDA) Miami Subtropical Horticulture Research Station, which was in need of several energy upgrades. USDA teamed up with Florida Light & Power to install much needed facility improvements are creating a savings of $85,000 per year.

  15. CSO DISINFECTION PILOT STUDY: SPRING CREEK CSO STORAGE FACILITY UPGRADE

    EPA Science Inventory

    This research summary presents the results of a pilot-scale disinfection study performed for the New York City Department of Environmental Protection and the U.S. Environmental Protection Agency (US EPA) under a contract to Camp Dresser & McKee of Woodbury, New York. The main ob...

  16. 78 FR 6094 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; EPA's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... encompass organization-wide energy performance improvement, such as building technology upgrades, product... help EPA promote energy-efficient technologies by evaluating the efficiency of their buildings using... Leaders--Ineligible Facilities List (5900-20) ENERGY STAR Leaders--Leaders Story (5900-20) Service and...

  17. 77 FR 75451 - Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-20

    ... upgraded licenses or license renewals to operate the controls at a nuclear reactor facility. This... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2012-0184] Agency Information Collection Activities: Submission for the Office of Management and Budget (OMB) Review; Comment Request AGENCY: Nuclear Regulatory...

  18. Environmental Control Systems for Exploration Missions One and Two

    NASA Technical Reports Server (NTRS)

    Falcone, Mark A.

    2017-01-01

    In preparing for Exploration Missions One and Two (EM-1 & EM-2), the Ground Systems Development and Operations Program has significant updates to be made to nearly all facilities. This is all being done to accommodate the Space Launch System, which will be the world’s largest rocket in history upon fruition. Facilitating the launch of such a rocket requires an updated Vehicle Assembly Building, an upgraded Launchpad, Payload Processing Facility, and more. In this project, Environmental Control Systems across several facilities were involved, though there is a focus around the Mobile Launcher and Launchpad. Parts were ordered, analysis models were updated, design drawings were updated, and more.

  19. Considerations on Energy Frontier Colliders after LHC

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shiltsev, Vladimir

    2016-11-15

    Since 1960’s, particle colliders have been in the forefront of particle physics, 29 total have been built and operated, 7 are in operation now. At present the near term US, European and international strategies of the particle physics community are centered on full exploitation of the physics potential of the Large Hadron Collider (LHC) through its high-luminosity upgrade (HL-LHC). The future of the world-wide HEP community critically depends on the feasibility of possible post-LHC colliders. The concept of the feasibility is complex and includes at least three factors: feasibility of energy, feasibility of luminosity and feasibility of cost. Here wemore » overview all current options for post-LHC colliders from such perspective (ILC, CLIC, Muon Collider, plasma colliders, CEPC, FCC, HE-LHC) and discuss major challenges and accelerator R&D required to demonstrate feasibility of an energy frontier accelerator facility following the LHC. We conclude by taking a look into ultimate energy reach accelerators based on plasmas and crystals, and discussion on the perspectives for the far future of the accelerator-based particle physics. This paper largely follows previous study [1] and the presenta ion given at the ICHEP’2016 conference in Chicago [2].« less

  20. Current Continuing Professional Education Practice among Malaysian Nurses

    PubMed Central

    Chong, Mei Chan; Francis, Karen; Cooper, Simon; Abdullah, Khatijah Lim

    2014-01-01

    Nurses need to participate in CPE to update their knowledge and increase their competencies. This research was carried out to explore their current practice and the future general needs for CPE. This cross-sectional descriptive study involved registered nurses from government hospitals and health clinics from Peninsular Malaysia. Multistage cluster sampling was used to recruit 1000 nurses from four states of Malaysia. Self-explanatory questionnaires were used to collect the data, which were analyzed using SPSS version 16. Seven hundred and ninety-two nurses participated in this survey. Only 80% (562) of the nurses had engaged in CPE activities during the past 12 months. All attendance for the various activities was below 50%. Workshops were the most popular CPE activity (345, 43.6%) and tertiary education was the most unpopular activity (10, 1.3%). The respondents did perceive the importance of future CPE activities for career development. Mandatory continuing professional education (MCPE) is a key measure to ensure that nurses upgrade their knowledge and skills; however, it is recommended that policy makers and nurse leaders in the continuing professional development unit of health service facilities plan CPE activities to meet registered nurses' (RNs) needs and not simply organizational requirements. PMID:24523961

  1. Gain Evaluation of Micro-Channel-Plate Photomultipliers in the Upgraded High-B Test Facility at Jefferson Lab

    NASA Astrophysics Data System (ADS)

    Barber, Corinne; DIRC at EIC Collaboration

    2015-10-01

    The High-B test facility at Thomas Jefferson National Accelerator Facility allows researchers to evaluate the gain of compact photon sensors, such as Micro-Channel-Plate Photomultipliers (MCP-PMTs), in magnetic fields up to 5 T. These ongoing studies support the development of a Detector of Internally Reflected Cherenkov light (DIRC) to be used in an Electron Ion Collider (EIC). Here, we present our summer 2015 activities to upgrade and improve the facility, and we show results for MCP-PMT gain changes in high B-fields. To monitor the light stability delivered to the MCP-PMTs being tested, we implemented a Silicon Photomultiplier (SiPM) in the setup and calibrated the ADC reading this sensor. A 405-nm Light-Emitting Diode (LED) housed in an optical tube compatible with neutral density filters was also installed. The filters provide an alternative way of reducing the light output of the LED to operate the MCP-PMTs in a single-photon mode. We calibrated a set of filters by means of a photodiode and measured the photon flux at multiple positions relative to the LED. This information helped us to design 3D-printed holders unique to each MCP-PMT so that the photocathode receives the greatest amount of light. The improvements to the setup allow for more precise PMT gain evaluation. This team includes 7 collaborators/co-authors besides myself: Yordanka Ilieva, Kijun Park, Greg Kalicy, Carl Zorn, Pawel Nadel-Turonski, Tongtong Cao, and Lee.

  2. Upgrades to Electronic Speckle Interferometer (ESPI) Operation and Data Analysis at NASA's Goddard Space Flight Center

    NASA Technical Reports Server (NTRS)

    Connelly, Joseph; Blake, Peter; Jones, Joycelyn

    2008-01-01

    The authors report operational upgrades and streamlined data analysis of a commissioned electronic speckle interferometer (ESPI) in a permanent in-house facility at NASA's Goddard Space Flight Center. Our ESPI was commercially purchased for use by the James Webb Space Telescope (JWST) development team. We have quantified and reduced systematic error sources, improved the software operability with a user-friendly graphic interface, developed an instrument simulator, streamlined data analysis for long-duration testing, and implemented a turn-key approach to speckle interferometry. We also summarize results from a test of the JWST support structure (previously published), and present new results from several pieces of test hardware at various environmental conditions.

  3. A Roadmap for HEP Software and Computing R&D for the 2020s

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alves, Antonio Augusto, Jr; et al.

    Particle physics has an ambitious and broad experimental programme for the coming decades. This programme requires large investments in detector hardware, either to build new facilities and experiments, or to upgrade existing ones. Similarly, it requires commensurate investment in the R&D of software to acquire, manage, process, and analyse the shear amounts of data to be recorded. In planning for the HL-LHC in particular, it is critical that all of the collaborating stakeholders agree on the software goals and priorities, and that the efforts complement each other. In this spirit, this white paper describes the R&D activities required to preparemore » for this software upgrade.« less

  4. The extraction of bitumen from western oil sands: Volume 2. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Oblad, A.G.; Dahlstrom, D.A.; Deo, M.D.

    1997-11-26

    The program is composed of 20 projects, of which 17 are laboratory bench or laboratory pilot scale processes or computer process simulations that are performed in existing facilities on the University of Utah campus in north-east Salt Lake City. These tasks are: (1) coupled fluidized-bed bitumen recovery and coked sand combustion; (2) water-based recovery of bitumen; (3) oil sand pyrolysis in a continuous rotary kiln reactor; (4) oil sand pyrolysis in a large diameter fluidized bed reactor; (5) oil sand pyrolysis in a small diameter fluidized bed reactor; (6) combustion of spent sand in a transport reactor; (7) recovery andmore » upgrading of oil sand bitumen using solvent extraction methods; (8) fixed-bed hydrotreating of Uinta Basin bitumens and bitumen-derived hydrocarbon liquids; (9) ebullieted bed hydrotreating of bitumen and bitumen derived liquids; (10) bitumen upgrading by hydropyrolysis; (11) evaluation of Utah`s major oil sand deposits for the production of asphalt, high-energy jet fuels and other specialty products; (12) characterization of the bitumens and reservoir rocks from the Uinta Basin oil sand deposits; (13) bitumen upgrading pilot plant recommendations; (14) liquid-solid separation and fine tailings thickening; (15) in-situ production of heavy oil from Uinta Basin oil sand deposits; (16) oil sand research and development group analytical facility; and (17) process economics. This volume contains reports on nine of these projects, references, and a bibliography. 351 refs., 192 figs., 65 tabs.« less

  5. Tevatron beam position monitor upgrade

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolbers, Stephen; Banerjee, B.; Barker, B.

    2005-05-01

    The Tevatron Beam Position Monitor (BPM) readout electronics and software have been upgraded to improve measurement precision, functionality and reliability. The original system, designed and built in the early 1980's, became inadequate for current and future operations of the Tevatron. The upgraded system consists of 960 channels of new electronics to process analog signals from 240 BPMs, new front-end software, new online and controls software, and modified applications to take advantage of the improved measurements and support the new functionality. The new system reads signals from both ends of the existing directional stripline pickups to provide simultaneous proton and antiprotonmore » position measurements. Measurements using the new system are presented that demonstrate its improved resolution and overall performance.« less

  6. New Mexico Liquid Metal αω -dynamo experiment: Most Recent Progress

    NASA Astrophysics Data System (ADS)

    Si, Jiahe; Sonnenfeld, Richard; Colgate, Art; Li, Hui

    2017-10-01

    The goal of the New Mexico Liquid Metal αω -dynamo experiment is to demonstrate a galactic dynamo can be generated through two phases, the ω-phase and α-phase by two semi-coherent flows in laboratory. We have demonstrated an 8-fold poloidal-to-toroidal flux amplification from differential rotation (the ω-effect) by minimizing turbulence in our apparatus. To demonstrate the α-effect, major upgrades are needed. The upgrades include building a helicity injection facility, mounting new 100hp motors and new sensors, designing a new data acquisition system capable of transmitting data from about 80 sensors in a high speed rotating frame with an overall 200kS/sec sampling rate. We hope the upgrade can be utilized to answer the question of whether a self-sustaining αω -dynamo can be implemented with a realistic lab fluid flow field, as well as to obtain more details to understand dynamo action in highly turbulent Couette flow.

  7. Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade

    NASA Astrophysics Data System (ADS)

    Herrmann, A.; Greuner, H.; Fuchs, J. C.; de Marné, P.; Neu, R.; ASDEX Upgrade Team

    2009-12-01

    ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N2-seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.

  8. X-ray intensity and source size characterizations for the 25 kV upgraded Manson source at Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loisel, G., E-mail: gploise@sandia.gov; Lake, P.; Gard, P.

    2016-11-15

    At Sandia National Laboratories, the x-ray generator Manson source model 5 was upgraded from 10 to 25 kV. The purpose of the upgrade is to drive higher characteristics photon energies with higher throughput. In this work we present characterization studies for the source size and the x-ray intensity when varying the source voltage for a series of K-, L-, and M-shell lines emitted from Al, Y, and Au elements composing the anode. We used a 2-pinhole camera to measure the source size and an energy dispersive detector to monitor the spectral content and intensity of the x-ray source. As themore » voltage increases, the source size is significantly reduced and line intensity is increased for the three materials. We can take advantage of the smaller source size and higher source throughput to effectively calibrate the suite of Z Pulsed Power Facility crystal spectrometers.« less

  9. Operations and maintenance philosophy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN, G.P.

    1999-10-28

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  10. Fermilab’s Accelerator Complex: Current Status, Upgrades and Outlook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Convery, M. E.

    We report on the status of the Fermilab accelerator complex, including recent performance, upgrades in progress, and plans for the future. Beam delivery to the neutrino experiments surpassed our goals for the past year. The Proton Improvement Plan is well underway with successful 15 Hz beam operation. Beam power of 700 kW to the NOvA experiment was demonstrated and will be routine in the next year. We are also preparing the Muon Campus to commission beam to the g-2 experiment.

  11. Unmanned Aerial Systems, Moored Balloons, and the U.S. Department of Energy ARM Facilities in Alaska

    NASA Astrophysics Data System (ADS)

    Ivey, Mark; Verlinde, Johannes

    2014-05-01

    The U.S. Department of Energy (DOE), through its scientific user facility, the Atmospheric Radiation Measurement (ARM) Climate Research Facility, provides scientific infrastructure and data to the international Arctic research community via its research sites located on the North Slope of Alaska. Facilities and infrastructure to support operations of unmanned aerial systems for science missions in the Arctic and North Slope of Alaska were established at Oliktok Point Alaska in 2013. Tethered instrumented balloons will be used in the near future to make measurements of clouds in the boundary layer including mixed-phase clouds. The DOE ARM Program has operated an atmospheric measurement facility in Barrow, Alaska, since 1998. Major upgrades to this facility, including scanning radars, were added in 2010. Arctic Observing Networks are essential to meet growing policy, social, commercial, and scientific needs. Calibrated, high-quality arctic geophysical datasets that span ten years or longer are especially important for climate studies, climate model initializations and validations, and for related climate policy activities. For example, atmospheric data and derived atmospheric forcing estimates are critical for sea-ice simulations. International requirements for well-coordinated, long-term, and sustained Arctic Observing Networks and easily-accessible data sets collected by those networks have been recognized by many high-level workshops and reports (Arctic Council Meetings and workshops, National Research Council reports, NSF workshops and others). The recent Sustaining Arctic Observation Network (SAON) initiative sponsored a series of workshops to "develop a set of recommendations on how to achieve long-term Arctic-wide observing activities that provide free, open, and timely access to high-quality data that will realize pan-Arctic and global value-added services and provide societal benefits." This poster will present information on opportunities for members of the arctic research community to make atmospheric measurements using unmanned aerial systems or tethered balloons.

  12. 76 FR 2365 - Dominion Transmission, Inc.; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-13

    ... installed at three existing compressor stations, a new meter station, and an upgrade at an existing regulator station, all located at existing DTI facilities in Pennsylvania. This EA will be used by the... Compressor Station in Jefferson/Indiana, Elk, and Clinton Counties, Pennsylvania. All construction would take...

  13. 77 FR 64503 - Questar Pipeline Company; Notice of Intent To Prepare an Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ...'s existing Payson Gate Meter Station for the downstream Lake Side 2 Power Plant. No incremental... County: A second compressor package at its existing Thistle Creek Compressor Station; Replacement of... pressure; and Metering and ancillary facility upgrades at Questar's existing Payson Gate Meter Station. In...

  14. 78 FR 71635 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ...; poor conditions; asbestos/lead; contact Interior for more info. Imperial Dam Camp House 1 2400 Imperial.../upgrades needed; asbestos/lead; contact Interior for more info. Bldg. 2172 Marine Corps Air Ground Task... exterior/interior wood damage; asbestos/lead; secured area; contact Navy for more info. Bldg. 2175 Marine...

  15. 78 FR 58184 - Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ...] Approval and Promulgation of Implementation Plans; North Carolina; Removal of Stage II Gasoline Vapor... measures for new and upgraded gasoline dispensing facilities in the State. The September 18, 2009, SIP... .0953), entitled Vapor Return Piping for Stage II Vapor Recovery, for all new or improved gasoline tanks...

  16. Developing the mechatronics and robotics at Nizhny Tagil Technological Institute of Ural Federal University

    NASA Astrophysics Data System (ADS)

    Goman, V. V.; Fedoreev, S. A.

    2018-02-01

    This report concerns the development trends of education in the field of the Mechatronics and Robotics at Nizhny Tagil Technological Institute (branch of Ural Federal University). The paper considers new teaching technologies, experience in upgrade of the laboratory facilities and some results of development Mechatronics and Robotics educational courses.

  17. Gamma-Ray Effects Testing in Lawrence Livermore National Laboratory’s Nova Upgrade Facility

    DTIC Science & Technology

    1992-03-01

    However, the distribution of energy between neutrons and photons from the ICF pellet will be different then that from a thermonuclear bomb . In a...of the neutron energy to photons. Photons make up most of the energy released from a thermonuclear bomb (Glasstone, S., 1977:340-342). The neutrons

  18. Avoiding Preconceptions in School Construction

    ERIC Educational Resources Information Center

    Maletz, Andrew

    2012-01-01

    An existing facility that is being upgraded or retrofitted today typically is 30 to 45 years old, often with limited natural light, antiquated mechanical systems and retrofitted technology. All too often at the outset of a project, the broader project goals--and even those narrower in scope--seem daunting or altogether impossible when staring at a…

  19. Energy Systems Integration News | Energy Systems Integration Facility |

    Science.gov Websites

    Grid Modernization Project Informed by ESIF Research The Hawaii Public Utilities Commission approved on (HECO) to upgrade its five island power grids. The plan describes the scope and estimated cost to update the energy networks of Hawaiian Electric, Maui Electric, and Hawaii Electric Light in the next five

  20. 75 FR 64359 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... environmental impact statement or environmental assessment need be prepared for these amendments. If the... authorization to upgrade selected Emergency Action Levels based on Nuclear Energy Institute (NEI) 99-01... of NRC Regulatory Issue Summary 2003-18, Supplement 2, ``Use of Nuclear Energy Institute (NEI) 99-01...

  1. Upgrade and Operation of the DNA Dust Erosion Test Facility

    DTIC Science & Technology

    1990-11-01

    Robert G. Oeding PDA Engineering 2975 Redhill Avenue Costa Mesa, CA 92626 November 1990 ,)TICI-i -LECTE NOV 2 7,19W Techical ReportD CONTRACT No. DNA...Engineering 2975 Redhill Avenue Costa Mesa, CA 92626 PDA-TR-1385-03-01 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORING

  2. Requirements and Capabilities for Fielding Cryogenic DT-Containing Fill-Tube Targets for Direct-Drive Experiments on OMEGA

    DOE PAGES

    Harding, D. R.; Ulreich, J.; Wittman, M. D.; ...

    2017-12-06

    Improving the performance of direct-drive cryogenic targets at the Omega Laser Facility requires the development of a new cryogenic system to (i) field non permeable targets with a fill tube, and (ii) provide a clean environment around the target. This capability is to demonstrate that imploding a scaled-down version of the direct-drive–ignition target for the National Ignition Facility (NIF) on the OMEGA laser will generate the hot-spot pressure that is needed for ignition; this will justify future cryogenic direct-drive experiments on the NIF. The paper describes the target, the cryogenic equipment that is being constructed to achieve this goal, andmore » the proposed target delivery process. Thermal calculations, fill-tube–based target designs, and structural/vibrational analyses are provided to demonstrate the credibility of the design. This new design will include capabilities not available (or possible) with the existing OMEGA cryogenic system, with the emphasis being to preserve a pristinely clean environment around the target, and to provide upgraded diagnostics to characterize both the ice layer and the target’s surface. The conceptual design is complete and testing of prototypes and subcomponents is underway. The rationale and capabilities of the new design are discussed.« less

  3. Requirements and Capabilities for Fielding Cryogenic DT-Containing Fill-Tube Targets for Direct-Drive Experiments on OMEGA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harding, D. R.; Ulreich, J.; Wittman, M. D.

    Improving the performance of direct-drive cryogenic targets at the Omega Laser Facility requires the development of a new cryogenic system to (i) field non permeable targets with a fill tube, and (ii) provide a clean environment around the target. This capability is to demonstrate that imploding a scaled-down version of the direct-drive–ignition target for the National Ignition Facility (NIF) on the OMEGA laser will generate the hot-spot pressure that is needed for ignition; this will justify future cryogenic direct-drive experiments on the NIF. The paper describes the target, the cryogenic equipment that is being constructed to achieve this goal, andmore » the proposed target delivery process. Thermal calculations, fill-tube–based target designs, and structural/vibrational analyses are provided to demonstrate the credibility of the design. This new design will include capabilities not available (or possible) with the existing OMEGA cryogenic system, with the emphasis being to preserve a pristinely clean environment around the target, and to provide upgraded diagnostics to characterize both the ice layer and the target’s surface. The conceptual design is complete and testing of prototypes and subcomponents is underway. The rationale and capabilities of the new design are discussed.« less

  4. OBSIP: An Evolving Facility for the Future of Geoscience

    NASA Astrophysics Data System (ADS)

    Evers, B.; Aderhold, K.

    2015-12-01

    The Ocean Bottom Seismograph Instrument Pool "OBSIP" is a National Science Foundation (NSF) sponsored instrument facility that provides ocean bottom seismometers and technical support for research in the areas of marine geology, seismology, and geodynamics. OBSIP provides both short period instruments (for active source seismic refraction studies) and long period instruments (for long term passive experiments). OBSIP is comprised of three Institutional Instrument Contributors each of whom contribute instruments and technical support to the pool and an OBSIP Management Office. In 2015, OBSIP will provide instruments for six experiments and support nine research cruises recovering and/or deploying instruments. This includes the final recoveries for the Cascadia Initiative experiment and the Eastern North American Margin experiment, both multi-year community seismic experiments integrating large onshore and offshore deployments of instruments from multiple IICs. OBSIp supported additional experiments in New Zealand and Malawi, Africa. An active source experiment to image the magma plumbing of Santorini employs OBSIP's entire short period sensor pool. OBSIP is also incorporating new technical developments in the OBSIP fleet including long duration OBS technology, new shielding designs, and sensor upgrades. OBSIP continues to enable innovation in experiment design, instrument capabilities, and data return/QAQC tracking and adapts to the needs of a rapidly increasing and diversifying pool of users.

  5. Diesel production from Fischer-Tropsch: the past, the present, and new concepts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dieter Leckel

    2009-05-15

    Fischer-Tropsch synthesis is technically classified into two categories, the high-temperature Fischer-Tropsch (HTFT) and the low-temperature Fischer-Tropsch (LTFT) processes. The criterion for this classification is the operating temperature of the synthesis, which ranges between 310-340{sup o}C for the HTFT process and 210-260{sup o}C for the LTFT process. A Fischer-Tropsch facility can be divided into roughly three sections, synthesis gas (syngas) generation, FT synthesis, and refining of the synthetic crude (syncrude). Fischer-Tropsch refineries differ regarding the product upgrading, and both transportation fuels and chemicals can be produced. Regarding the FT refinery history, the configuration of each refinery also reflects the requirements ofmore » the fuel specification at that time. This paper gives a condensed overview of how Fischer-Tropsch facilities changed during the last 70 years and focuses in particular on the diesel fuel produced. Some conceptual flow schemes are additionally presented with emphasis on the combined upgrading of the high boiling part of the FT product spectrum with liquids derived from coal pyrolysis. 52 refs., 14 figs., 12 tabs.« less

  6. Application of Pressure-Based Wall Correction Methods to Two NASA Langley Wind Tunnels

    NASA Technical Reports Server (NTRS)

    Iyer, V.; Everhart, J. L.

    2001-01-01

    This paper is a description and status report on the implementation and application of the WICS wall interference method to the National Transonic Facility (NTF) and the 14 x 22-ft subsonic wind tunnel at the NASA Langley Research Center. The method calculates free-air corrections to the measured parameters and aerodynamic coefficients for full span and semispan models when the tunnels are in the solid-wall configuration. From a data quality point of view, these corrections remove predictable bias errors in the measurement due to the presence of the tunnel walls. At the NTF, the method is operational in the off-line and on-line modes, with three tests already computed for wall corrections. At the 14 x 22-ft tunnel, initial implementation has been done based on a test on a full span wing. This facility is currently scheduled for an upgrade to its wall pressure measurement system. With the addition of new wall orifices and other instrumentation upgrades, a significant improvement in the wall correction accuracy is expected.

  7. BNL ATF II beamlines design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fedurin, M.; Jing, Y.; Stratakis, D.

    The Brookhaven National Laboratory. Accelerator Test Facility (BNL ATF) is currently undergoing a major upgrade (ATF-II). Together with a new location and much improved facilities, the ATF will see an upgrade in its major capabilities: electron beam energy and quality and CO 2 laser power. The electron beam energy will be increased in stages, first to 100-150 MeV followed by a further increase to 500 MeV. Combined with the planned increase in CO 2 laser power (from 1-100 TW), the ATF-II will be a powerful tool for Advanced Accelerator research. A high-brightness electron beam, produced by a photocathode gun, willmore » be accelerated and optionally delivered to multiple beamlines. Besides the energy range (up to a possible 500 MeV in the final stage) the electron beam can be tailored to each experiment with options such as: small transverse beam size (<10 um), short bunch length (<100 fsec) and, combined short and small bunch options. This report gives a detailed overview of the ATFII capabilities and beamlines configuration.« less

  8. US-Russian Cooperation in Upgrading MC&A System at Rosatom Facilities: Measurement of Nuclear Materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Powell, Danny H; Jensen, Bruce A

    2011-01-01

    Improve protection of weapons-usable nuclear material from theft or diversion through the development and support of a nationwide sustainable and effective Material Control and Accountability (MC&A) program based on material measurement. The material protection, control, and accountability (MPC&A) cooperation has yielded significant results in implementing MC&A measurements at Russian nuclear facilities: (1) Establishment of MEM WG and MEMS SP; (2) Infrastructure for development, certification, and distribution of RMs; and (3) Coordination on development and implementation of MMs.

  9. Icing simulation: A survey of computer models and experimental facilities

    NASA Technical Reports Server (NTRS)

    Potapczuk, M. G.; Reinmann, J. J.

    1991-01-01

    A survey of the current methods for simulation of the response of an aircraft or aircraft subsystem to an icing encounter is presented. The topics discussed include a computer code modeling of aircraft icing and performance degradation, an evaluation of experimental facility simulation capabilities, and ice protection system evaluation tests in simulated icing conditions. Current research focussed on upgrading simulation fidelity of both experimental and computational methods is discussed. The need for increased understanding of the physical processes governing ice accretion, ice shedding, and iced airfoil aerodynamics is examined.

  10. Icing simulation: A survey of computer models and experimental facilities

    NASA Technical Reports Server (NTRS)

    Potapczuk, M. G.; Reinmann, J. J.

    1991-01-01

    A survey of the current methods for simulation of the response of an aircraft or aircraft subsystem to an icing encounter is presented. The topics discussed include a computer code modeling of aircraft icing and performance degradation, an evaluation of experimental facility simulation capabilities, and ice protection system evaluation tests in simulated icing conditions. Current research focused on upgrading simulation fidelity of both experimental and computational methods is discussed. The need for the increased understanding of the physical processes governing ice accretion, ice shedding, and iced aerodynamics is examined.

  11. Defeating the Active Shooter: Applying Facility Upgrades in Order to Mitigate the Effects of Active Shooters in High Occupancy Facilities

    DTIC Science & Technology

    2012-06-01

    Virginia Tech, 90. 51 exterior doors, he roamed the halls of the second floor peering into classrooms. Without saying a word, Cho entered the...carried out his actions in complete silence without saying a word. He gave no indication of rationale or motive during the entire incident that lasted...without saying a word, proceeded to open fire on the classroom. Goddard, the student who had called 9-1-1, was among the first to be shot. As he fell

  12. Recovery Act: High-Efficiency, Wideband Three-Phase Rectifiers and Adaptive Rectifier Management for Telecomm Central Office and Large Data Center Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mark A. Johnson

    2012-06-29

    Lineage Power and Verizon teamed up to address a DOE funding opportunity focused on improving the power conversion chain in telecommunications facilities and data centers. The project had three significant elements: the design and development of high efficiency and high power three-phase rectifiers by Lineage Power, design and development of software to optimize overall plant energy efficiency by Lineage Power, and a field trial in active Verizon telecommunications facilities where energy consumption was measured before and after efficiency upgrades.

  13. Successful MPPF Pneumatics Verification and Validation Testing

    NASA Image and Video Library

    2017-03-28

    Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.

  14. Successful MPPF Pneumatics Verification and Validation Testing

    NASA Image and Video Library

    2017-03-28

    Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the top level of the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.

  15. Characterization and application of a broad bandwidth oscillator for the HELEN laser facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Andrew, J.E.; Stevenson, R.M.; Bett, T.H.

    1995-12-31

    Preliminary investigations of a potential broad band oscillator for the HELEN laser facility and its proposed upgrade are described. The reasons for the need of broad bandwidth and the choice of commercial technology to achieve it are discussed. The characterization of the device and the diagnostics used for the investigations are described. Small signal amplification of the bandwidth by a glass amplifier was also performed along with investigations of the effect of various bandwidths on the far field beam quality when using random phase plates.

  16. VISIR upgrade overview and status

    NASA Astrophysics Data System (ADS)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  17. Progress and plan of KSTAR plasma control system upgrade

    DOE PAGES

    Hahn, Sang-hee; Kim, Y. J.; Penaflor, B. G.; ...

    2016-06-01

    The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable duringmore » the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.« less

  18. Design summary of a geostationary facility utilized as a communications platform

    NASA Technical Reports Server (NTRS)

    Barberis, N. J.; Brown, J. V.

    1986-01-01

    This paper describes the technical aspects of a geostationary platform facility that makes maximum use of the planned NASA space station and its elements, mainly the orbital maneuvering vehicle (OMV) and the orbital transfer vehicles (OTV). The platform design concept is described, with emphasis on the key technologies utilized to configure the platform. Key systems aspects include a design summary with discussion of the controls, telemetry, command and ranging, power, propulsion, control electronics, thermal control subsystems, and space station interfaces. The use of the facility as a communications platform is developed to demonstrate the attractiveness of the concept. The economic benefits are discussed, as well as the concept of servicing for payload upgrade.

  19. KSC-98pc1160

    NASA Image and Video Library

    1998-09-27

    KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top touches down at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  20. KSC-98pc1161

    NASA Image and Video Library

    1998-09-27

    KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft gently lands its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  1. KSC-98pc1159

    NASA Image and Video Library

    1998-09-27

    KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft with orbiter Atlantis on top arrives at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    When the facilities design and construction team at the University of California, San Diego (UCSD) started planning to upgrade and expand their control system, they had several critical goals for the project. They wanted a building automation system (BAS) that could achieve optimum energy savings while maximizing the efficiency of the facilities staff. They needed the new system to link 26 campus buildings--containing a variety of existing systems--to one central location for monitoring and diagnostics. They wanted a single vendor to handle installation, software development, service and support--and they wanted the entire project completed without downtime. At the core ofmore » these technologies is the Metasys{reg_sign} facility management system from Johnson Controls.« less

  3. K-BREF(Korean BAT reference document) development : BAT and BAT-AELs for large combustion plants and waste incinerators in Korea.

    NASA Astrophysics Data System (ADS)

    Yoo, Heungmin; Lee, Daegyun; Park, Jaehong

    2017-04-01

    Since the initial environmental policy namely "Regulation on assigning license for environmental pollutant emission facilities" was introduced in 1971, the previous environmental policy that assign licenses on emission facilities of each pollutant has been implementing in Korea. From this, economic standard and environmental quality of Korea are recognized as level of developed countries, even though various development activities for industrialization. However, amount of pollutant, emission route and emission source are increasing with development of various industries, and citizens recognition for environment have been changed as well. Thus, ministry of environment of Korea needs systematic policy based on scientific grounds for conversion of paradigm. For this, ministry of environment was introduced new policy namely "integrated pollution prevention and control(IPPC)", and it will be implemented from 2017 in Korea. IPPC is established for considering environment, economic and efficiency: 10 licenses on each pollutant emission will be integrated to one license, and it can be expected simplification for business licensing process. As well, this policy can be upgraded and processed while considering characteristics on location and industry types, in the future. However, to conduct this system harmoniously, policy demanders have to apply integrated control system to their facilities. Especially, the first applied industries by IPPC are two industries, such as large combustion plants for power generation and waste incineration facilities. Therefore, ministry of environment has to publish technical guideline books firstly for those industries, and they were named to "BAT reference document(BREF)". In this study, essential information for BREFs publishment, that is including emission levels, best available technique(BAT) and so on was investigated. In addition, the BAT-associated emission levels (BAT-AELs) of each industry were set using emission data obtained from realtime-monitoring system.

  4. Precursor-Based Synthesis of Porous Colloidal Particles towards Highly Efficient Catalysts.

    PubMed

    Zheng, Yun; Geng, Hongbo; Zhang, Yufei; Chen, Libao; Li, Cheng Chao

    2018-04-02

    In recent years, porous colloidal particles have found promising applications in catalytic fields, such as photocatalysis, electrocatalysis, industrial and automotive byproducts removal, as well as biomass upgrading. These applications are critical for alleviating the energy crisis and environmental pollution. Porous colloidal particles have remarkable specific areas and abundant reactive sites, which can significantly improve the mass/charge transport and reaction rate in catalysis. Precursor-based synthesis is among the most facile and widely-adopted methods to achieve monodisperse and homogeneous porous colloidal particles. In the current review, we briefly introduce the general catalytic applications of porous colloidal particles. The conventional precursor-based methods are reviewed to design state-of-the-art porous colloidal particles as highly efficient catalysts. The recent development of porous colloidal particles derived from metal-organic frameworks (MOFs), glycerates, carbonate precursors, and ion exchange methods are reviewed. In the end, the current concerns and future development of porous colloidal particles are outlined. © 2018 Wiley-VCH Verlag GmbH & Co. KGaA, Weinheim.

  5. ER@CEBAF: A test of 5-pass energy recovery at CEBAF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bogacz, S. A.; Douglas, D.; Dubbe, C.

    2016-06-06

    Jefferson Lab personnel have broad expertise in the design, commissioning, and operation of multiple energy recovery linacs (ERLs): the CEBAF Front-End Test (early 1990s), CEBAF-ER (2003), the IR Free Electron Laser (FEL) Demo, the IR FEL Upgrade, and the UV FEL Driver (1997-2014). Continued development of this core competency has led to this collaborative proposal to explore the forefronts of ERL technology at high energy in a unique expansion of CEBAF capability to a 5-pass ERL with negligible switchover time and programmatic impact to the CEBAF physics program. Such a capability would enable world-class studies of open issues in high-energymore » ERL beam dynamics that are relevant to future facilities such as electron-ion colliders (EICs). This proposal requests support from the CEBAF Program Advisory Committee to seek funding for hardware installation, and a prospective 12 days of beam time circa Fall 2018 for commissioning this high-energy multi-pass ERL experiment in CEBAF.« less

  6. MSFC Electrostatic Levitator (ESL) Rapid Quench System

    NASA Technical Reports Server (NTRS)

    SanSoucie, Michael P.; Craven, Paul D.; Rogers, Jan R.

    2014-01-01

    The NASA Marshall Space Flight Center (MSFC) Electrostatic Levitator (ESL) Laboratory is a unique facility for investigators studying high-temperature materials. The laboratory boasts two levitators in which samples can be levitated, heated, melted, undercooled, and resolidified, all without the interference of a container or data-gathering instrument. The ESL main chamber has been upgraded with the addition of a rapid quench system. This system allows samples to be dropped into a quench vessel that can be filled with a low melting point material, such as a gallium or indium alloy. Thereby allowing rapid quenching of undercooled liquid metals. Up to 8 quench vessels can be loaded into the quench wheel, which is indexed with LabVIEW control software. This allows up to 8 samples to be rapidly quenched before having to open the chamber. The system has been tested successfully on several zirconium samples. Future work will be done with other materials using different quench mediums. Microstructural analysis will also be done on successfully quench samples.

  7. Recent advances in β-decay spectroscopy at CARIBU

    NASA Astrophysics Data System (ADS)

    Mitchell, A. J.; Copp, P.; Savard, G.; Lister, C. J.; Lane, G. J.; Carpenter, M. P.; Clark, J. A.; Zhu, S.; Ayangeakaa, A. D.; Bottoni, S.; Brown, T. B.; Chowdhury, P.; Chillery, T. W.; David, H. M.; Hartley, D. J.; Heckmaier, E.; Janssens, R. V. F.; Kolos, K.; Kondev, F. G.; Lauritsen, T.; McCutchan, E. A.; Norman, E. B.; Padgett, S.; Scielzo, N. D.; Seweryniak, D.; Smith, M. L.; Wilson, G. L.

    2016-09-01

    β-decay spectroscopy of nuclei far from stability can provide powerful insight into a broad variety of topics in nuclear science, ranging from exotic nuclear structure phenomena, stellar nucleosynthesis processes, and applied topics such as quantifying "decay heat" discrepancies for advanced nuclear fuel cycles. Neutronrich nuclei approaching the drip-line are difficult to access experimentally, leaving many key examples largely under studied. The CARIBU radioactive beam facility at Argonne National Laboratory exploits spontaneous fission of 252Cf in production of such beams. The X-Array and SATURN decay station have been commissioned to perform detailed decay spectroscopy of low-energy CARIBU beams. An extended science campaign was started during 2015; with projects investigating nuclear shape changes, collective octupole vibrations, β-delayed neutron emission, and decay-scheme properties which could explain the reactor antineutrino puzzle. In this article we review the current status of the setup, update on the first results and recent hardware upgrades, and look forward to future possibilities.

  8. Silicon pore optics for future x-ray telescopes

    NASA Astrophysics Data System (ADS)

    Wille, Eric; Bavdaz, Marcos; Wallace, Kotska; Shortt, Brian; Collon, Maximilien; Ackermann, Marcelo; Günther, Ramses; Olde Riekerink, Mark; Koelewijn, Arenda; Haneveld, Jeroen; van Baren, Coen; Erhard, Markus; Kampf, Dirk; Christensen, Finn; Krumrey, Michael; Freyberg, Michael; Burwitz, Vadim

    2017-11-01

    Lightweight X-ray Wolter optics with a high angular resolution will enable the next generation of X-ray telescopes in space. The candidate mission ATHENA (Advanced Telescope for High Energy Astrophysics) required a mirror assembly of 1 m2 effective area (at 1 keV) and an angular resolution of 10 arcsec or better. These specifications can only be achieved with a novel technology like Silicon Pore Optics, which is being developed by ESA together with a consortium of European industry. Silicon Pore Optics are made of commercial Si wafers using process technology adapted from the semiconductor industry. We present the recent upgrades made to the manufacturing processes and equipment, ranging from the manufacture of single mirror plates towards complete focusing mirror modules mounted in flight configuration, and results from first vibration tests. The performance of the mirror modules is tested at X-ray facilities that were recently extended to measure optics at a focal distance up to 20 m.

  9. The high Beta cryo-modules and the associated cryogenic system for the HIE-ISOLDE upgrade at CERN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Delruelle, N.; Leclercq, Y.; Pirotte, O.

    2014-01-29

    The major upgrade of the energy and intensity of the existing ISOLDE and REX-ISOLDE radioactive ion beam facilities at CERN requires the replacement of most of the existing ISOLDE post-acceleration equipment by a superconducting linac based on quarter-wave resonators housed together with superconducting solenoids in a series of four high-β and two low-β cryo-modules. As well as providing optimum conditions for physics, the cryo-modules need to function under stringent vacuum and cryogenic conditions. We present the detail design and expected cryogenic performance of the high- β cryo-module together with the cryogenic supply and distribution system destined to service the completemore » superconducting linac.« less

  10. Implementation of the MPC and A Operations Monitoring (MOM) System at IRT-T FSRE Nuclear Power Institute (NPI)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitdikov,I.; Zenkov, A.; Tsibulnikov, Y.

    The Material Protection, Control and Accounting (MPC&A) Program has been working since 1994 with nuclear sites in Russia to upgrade the physical protection (PP) and material control and accounting (MC&A) functions at facilities containing weapons usable nuclear material. In early 2001, the MPC&A program initiated the MPC&A Operations Monitoring (MOM) Project to monitor facilities where MPC&A upgrades have been installed to provide increased confidence that personnel are present and vigilant, provide confidence that security procedures are being properly performed and provide additional assurance that nuclear materials have not been stolen. The MOM project began as a pilot project at themore » Moscow State Engineering Physics Institute (MEPhI) and a MOM system was successfully installed in October 2001. Following the success of the MEPhI pilot project, the MPC&A Program expanded the installation of MOM systems to several other Russian facilities, including the Nuclear Physics Institute (NPI) in Tomsk. The MOM system was made operational at NPI in October 2004. This paper is focused on the experience gained from operation of this system and the objectives of the MOM system. The paper also describes how the MOM system is used at NPI and, in particular, how the data is analyzed. Finally, potential expansion of the MOM system at NPI is described.« less

  11. Building a new space weather facility at the National Observatory of Athens

    NASA Astrophysics Data System (ADS)

    Kontogiannis, Ioannis; Belehaki, Anna; Tsiropoula, Georgia; Tsagouri, Ioanna; Anastasiadis, Anastasios; Papaioannou, Athanasios

    2016-01-01

    The PROTEAS project has been initiated at the Institute of Astronomy, Astrophysics, Space Applications and Remote Sensing (IAASARS) of the National Observatory of Athens (NOA). One of its main objectives is to provide observations, processed data and space weather nowcasting and forecasting products, designed to support the space weather research community and operators of commercial and industrial systems. The space weather products to be released by this facility, will be the result of the exploitation of ground-based, as well as space-borne observations and of model results and tools already available or under development by IAASARS researchers. The objective will be achieved through: (a) the operation of a small full-disk solar telescope to conduct regular observations of the Sun in the H-alpha line; (b) the construction of a database with near real-time solar observations which will be available to the community through a web-based facility (HELIOSERVER); (c) the development of a tool for forecasting Solar Energetic Particle (SEP) events in relation to observed solar eruptive events; (d) the upgrade of the Athens Digisonde with digital transceivers and the capability of operating in bi-static link mode and (e) the sustainable operation of the European Digital Upper Atmosphere Server (DIAS) upgraded with additional data sets integrated in an interface with the HELIOSERVER and with improved models for the real-time quantification of the effects of solar eruptive events in the ionosphere.

  12. Upgrade of the TITAN EBIT High Voltage Operation

    NASA Astrophysics Data System (ADS)

    Foster, Matt; Titan Collaboration

    2016-09-01

    TRIUMF's Ion Trap for Atomic and Nuclear science (TITAN) is a setup dedicated to highly precise mass measurements of short-lived isotopes down to 10ms. TITAN's Electron Beam Ion Trap (EBIT) is a charge breeder integrated into the setup to perform in-trap decay spectroscopy of highly charged ions and increase the precision of mass measurements. In its previous configuration TITAN's EBIT could not fulfil its maximum design specification due to high voltage safety restrictions, limiting its obtainable charge states. A recently completed upgrade of the high voltage operation that will allow the EBIT to fulfil its design specification and achieve higher charge states for heavier species is undergoing preliminary tests with stable beam. Simulations were performed to optimise the injection and extraction efficiency at high voltage and initial tests have involved using a Ge detector to identify x-rays produced by charge breeding stable ions. Future work comprises exploring electron capture rates of Ne-, He- and H-like charge states of 64Cu and higher masses, which were not previously accessible. The function of the EBIT within the TITAN setup, the work carried out on the upgrade thus far and its scope for future work will be presented.

  13. Energy storage and alternatives to improve train voltage on a mass transit system

    NASA Astrophysics Data System (ADS)

    Gordon, S. P.; Rorke, W. S.

    1995-04-01

    The wide separation of substations in the Bay Area Rapid Transit system's transbay tunnel contributes to voltage sag when power demand is high. In the future, expansions to the system will exacerbate this problem by increasing traffic density. Typically, this situation is remedied through the installation of additional substations to increase the system's power capacity. We have evaluated the efficacy of several alternatives to this approach - specifically, installation of an 8 megajoule energy storage system, modification of the existing substations, or reduction of the resistance of the running rails or the third rail. To support this analysis, we have developed a simple model of the traction power system in the tunnel. We have concluded that the storage system does not have sufficient capacity to deal with the expected voltage sags; in this application, the alternatives present more effective solutions. We have also investigated the potential impact of these system upgrades on expected future capital outlays by BART for traction power infrastructure additions. We have found that rail or substation upgrades may reduce the need for additional substations. These upgrades may also be effective on other parts of the BART system and on other traction power systems.

  14. An Overview of the NASA Aeronautics Test Program Strategic Plan

    NASA Technical Reports Server (NTRS)

    Marshall, Timothy J.

    2010-01-01

    U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.

  15. Incident Involving 30-Ah Li-ion Cell at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Bennett, William

    2006-01-01

    The key lesson learned from the February 17, 2006 cell explosion incident is that PC-based test-systems, even those having built-in watchdog monitors, can lose control and malfunction. In the case of lithiumion cell/battery testing, the stored energy can be released explosively causing considerable injury and damage to facilities. The investigation showed that although the Arbin system has a built-in watchdog monitor, the circumstances of the incident defeated the action of the watchdog and allowed the cycler to continue operation without control. An upgrade to the most recent version of Arbin software (version 4) was provided as a fix to the presumed control problem. This upgrade included newer EPROM s for the cycler microprocessor. Investigation revealed that similar incidents have occurred at other NASA centers with a variety of PC-based test instruments. JPL suffered an incident with Maccor testers and the GRC fuel cell group observed similar problems with LabView software. This is not exclusively an Arbin problem, but an issue with all PC-based systems. In this incident, it was fortunate that the event occurred after-hours with no-one in the room. The facility arrangement placed control consoles adjacent to the test chamber doors. Had someone been in the room during the event, they would have been exposed to hot debris and toxic combustion products. It was also fortunate that the exploded cell stayed inside the chamber after the door was forced open. If the cell had been ejected into the room it could have caused serious facility damage by impact and possibly caused a fire in the facility.

  16. Development of Shanghai satellite laser ranging station

    NASA Technical Reports Server (NTRS)

    Yang, Fu-Min; Tan, De-Tong; Xiao, Chi-Kun; Chen, Wan-Zhen; Zhang, J.-H.; Zhang, Z.-P.; Lu, Wen-Hu; Hu, Z.-Q.; Tang, W.-F.; Chen, J.-P.

    1993-01-01

    The topics covered include the following: improvement of the system hardware; upgrading of the software; the observation status; preliminary daylight tracking capability; testing the new type of laser; and future plans.

  17. 76 FR 22692 - Florida Gas Transmission Company, LLC; Notice of Intent To Prepare an Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... operate a new 15,000-horsepower (hp) electric compressor station (CS 32) along its existing 26-inch... compressor station (CS 18) at MP 668.8; and upgrade existing pipeline facilities, all located in Orange... would be confined to the existing compressor station. The EA Process The National Environmental Policy...

  18. Study of data entry requirements at Marshall Space Flight Computation Center

    NASA Technical Reports Server (NTRS)

    Sherman, G. R.

    1975-01-01

    An economic and systems analysis of a data center was conducted. Current facilities for data storage of documentation are shown to be inadequate and outmoded for efficient data handling. Redesign of documents, condensation of the keypunching operation, upgrading of hardware, and retraining of personnel are the solutions proposed to improve the present data system.

  19. VLTI: First Light for the Second Generation

    NASA Astrophysics Data System (ADS)

    Woillez, J.; Gonté, F.; Abad, J. A.; Abadie, S.; Abuter, R.; Accardo, M.; Acuña, M.; Alonso, J.; Andolfato, L.; Avila, G.; Barriga, P. J.; Beltran, J.; Berger, J.-P.; Bollados, C.; Bourget, P.; Brast, R.; Bristow, P.; Caniguante, L.; Castillo, R.; Conzelmann, R.; Cortes, A.; Delplancke, F.; Dell Valle, D.; Derie, F.; Diaz, A.; Donoso, R.; Duhoux, Ph.; Dupuy, C.; Elao, C.; Egner, S.; Fuenteseca, E.; Fernandez, R.; Gaytan, D.; Glindemann, A.; Gonzales, J.; Guisard, S.; Hagenauer, P.; Haimerl, A.; Heinz, V.; Henriquez, J. P.; van der Heyden, P.; Hubin, N.; Huerta, R.; Jochum, L.; Kirchbauer, J.-P.; Leiva, A.; Lévêque, S.; Lizon, J.-P.; Luco, F.; Mardones, P.; Mellado, A.; Mérand, A.; Osorio, J.; Ott, J.; Pallanca, L.; Pavez, M.; Pasquini, L.; Percheron, I.; Pirard, J.-F.; Phan, D. T.; Pineda, J. C.; Pino, A.; Poupar, S.; Ramírez, A.; Reinero, C.; Riquelme, M.; Romero, J.; Rivinius, Th.; Rojas, C.; Rozas, F.; Salgado, F.; Schöller, M.; Schuhler, N.; Siclari, W.; Stephan, C.; Tamblay, R.; Tapia, M.; Tristram, K.; Valdes, G.; de Wit, W.-J.; Wright, A.; Zins, G.

    2015-12-01

    The Very Large Telescope Interferometer (VLTI) stopped operation on 4 March 2015 with the objective of upgrading its infrastructure in preparation for the second generation VLTI instruments GRAVITY and MATISSE. A brief account of the eight bustling months it took our interferometer to metamorphose into its second generation, under the supervision of the VLTI Facility Project, is presented.

  20. The 21st-Century Learning Environment

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2011-01-01

    Step into a classroom in the 21st century, and the odds are it won't look all that different from one in the 20th century. One decade into the 2000s, many schools and universities have been frustrated in their efforts to upgrade their facilities and resources because of shrinking budgets. But even with the ailing economy, some education…

  1. 75 FR 4407 - Science Board to the Food and Drug Administration; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... subcommittee reviewing research at the Center for Food Safety and Applied Nutrition. The Science Board will... appropriate research agenda, and on upgrading its scientific and research facilities to keep pace with these... scientific research programs. Date and Time: The meeting will be held on Monday, February 22, 2010, from 8 a...

  2. KSC01padig095

    NASA Image and Video Library

    2001-02-24

    [Photo courtesy of Boeing photographer Bob Williams.] The orbiter Columbia, atop a modified Boeing 747, rolls under protective cover at Palmdale, Calif. Columbia has been undergoing modifications and upgrades at Boeing’s Orbiter Assembly Facility in Palmdale and is ready to return to Kennedy Space Center. Ferry preparations and the flight plan are contingent upon weather conditions in California and enroute to Florida.

  3. National Pollutant Discharge Elimination System (NPDES) Permit Application Requirement for Storm Water Discharges

    DTIC Science & Technology

    1991-05-01

    schedule for construction, upgrading or operation of wastewater treatment facilities or any other environmental programs, which may effect storm water quality of...if the storm water quality may be similar. c. Two sets of samples are required to be collected: (1) A grab during the first 30 minutes of the rainfall

  4. Air pollution and dry deposition of nitrogen and sulphur in the AOSR estimated using passive samplers

    Treesearch

    Yu-Mei Hsu; Andrzej Bytnerowicz

    2015-01-01

    NO2 and SO2 are the primary pollutants produced by industrial facilities of the Athabasca Oil sand Region (AOSR), Alberta, Canada. The major emission sources are the upgrader stacks for SO2 and stacks, mine fleets and vehicles for NO2. After emitting from the sources, NO

  5. PSL Icing Facility Upgrade Overview

    NASA Technical Reports Server (NTRS)

    Griffin, Thomas A.; Dicki, Dennis J.; Lizanich, Paul J.

    2014-01-01

    The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, the PSL is capable of simulating icing events at altitude in a groundtest facility. The system was designed to operate at altitudes from 4,000 to 40,000 ft at Mach numbers up to 0.8M and inlet total temperatures from -60 to +15 degF. This paper and presentation will be part of a series of presentations on PSL Icing and will cover the development of the icing capability through design, developmental testing, installation, initial calibration, and validation engine testing. Information will be presented on the design criteria and process, spray bar developmental testing at Cox and Co., system capabilities, and initial calibration and engine validation test. The PSL icing system was designed to provide NASA and the icing community with a facility that could be used for research studies of engine icing by duplicating in-flight events in a controlled ground-test facility. With the system and the altitude chamber we can produce flight conditions and cloud environments to simulate those encountered in flight. The icing system can be controlled to set various cloud uniformities, droplet median volumetric diameter (MVD), and icing water content (IWC) through a wide variety of conditions. The PSL chamber can set altitudes, Mach numbers, and temperatures of interest to the icing community and also has the instrumentation capability of measuring engine performance during icing testing. PSL last year completed the calibration and initial engine validation of the facility utilizing a Honeywell ALF502-R5 engine and has duplicated in-flight roll back conditions experienced during flight testing. This paper will summarize the modifications and buildup of the facility to accomplish these tests.

  6. The Life and Professional Prospects of Future Specialists of Agricultural Production

    ERIC Educational Resources Information Center

    Khovalyg, N.; Kendivan, O.

    2006-01-01

    This article reports the findings of a survey examining the social and psychological characteristics of future specialists of agriculture who were enrolled as students in Tuva State University. The study was carried out by the Tuva State Institute for Cadre Retraining and Upgrading of Qualifications under the Government of the Republic of Tuva.…

  7. A Hybrid Catalytic Route to Fuels from Biomass Syngas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harmon, Laurel; Hallen, Richard; Lilga, Michael

    LanzaTech partnered with the Pacific Northwest National Laboratory (PNNL), Imperium Aviation Fuels, InEnTec, Orochem Technologies, the University of Delaware, Michigan Technological University, the National Renewable Energy Laboratory, and The Boeing Company, to develop a cost-effective hybrid conversion technology for catalytic upgrading of biomass-derived syngas to sustainable alternative jet fuel (SAJF) meeting the price, quality and environmental requirements of the aviation industry. Alternative “synthetic paraffinic kerosene” (SPK) blendstock produced from syngas via “Fischer-Tropsch” (F-T) or from lipids via “hydroprocessing of esters and fatty acids” (HEFA) are currently being used in commercial jet fuel blends containing at least 50% petroleum-based fuel. Thismore » project developed an alternative route to SAJF from ethanol, a type of “alcohol to jet” (ATJ) SPK. The project objective was to demonstrate a pathway that combines syngas fermentation to ethanol with catalytic upgrading of ethanol to sustainable alternative jet fuel and shows attractive overall system economics to drive down the price of biomass-derived jet fuel. The hybrid pathway was to be demonstrated on three biomass feedstocks: corn stover, woody biomass, and third biomass feedstock, cellulosic residues. The objective also included the co-production of chemicals, exemplified by 2,3-Butanediol (2,3-BDO), which can be converted to key chemical intermediates. The team successfully demonstrated that biomass syngas fermentation followed by catalytic conversion is a viable alternative to the Fischer-Tropsch process and produces a fuel with properties comparable to F-T and HEFA SPKs. Plasma gasification and gas fermentation were successfully integrated and demonstrated in continuous fermentations on waste wood, corn stover, and cellulosic bagasse. Gas fermentation was demonstrated to produce ethanol suitable for catalytic upgrading, isolating the upgrading from variations in biomass feed, syngas composition, and impurities. Ethanol feedstocks from all three types of biomass were demonstrated to be comparable to grain derived ethanol and suitable for the LT-PNNL ATJ process. The LT-PNNL ATJ catalytic upgrading process was demonstrated at lab scale for over 2000 hours of continuous operation on a single catalyst load. LanzaTech scaled up the ATJ process, producing 4000 gallons of jet and 600 gallons of diesel for testing and a future proving flight. The LT-PNNL ATJ process, at lab and pilot scale, using commercial grain-based ethanol and steel mill waste gas-based ethanol (“Lanzanol”), produces high-quality fuel-range distillates containing primarily normal paraffins and isoparaffins. The LT-PNNL ATJ fuel has equivalent properties to previously-approved SPKs such as F-T, HEFA, and ATJ from isobutanol, and conforms with critical properties needed to blend with conventional jet fuel. The project showed that the 2,3-BDO fermentation co-product can be separated economically utilizing Simulated Moving Bed (SMB) technology. 2,3-BDO can be catalytically converted to 1,3-butadiene (BD) in a two-step process with at least 70% yield, producing a chemical intermediate suitable for downstream applications. Technoeconomic and life cycle analyses of the biomass to jet process with and without 2,3-BDO production showed that capital costs are sensitive to the proportion of the 2,3-BDO co-product and biomass feedstock. The co-product 2,3-BDO, converted through to BD, significantly reduces the cash cost of production of the hydrocarbon fuels. Life cycle GHG emissions of ATJ SPK produced from biomass using a steam gasification system are projected to be significantly lower than those of conventional jet fuel. The project demonstrated that a high quality ATJ SPK, can be produced from biomass via a hybrid gas fermentation/catalytic route. Validation of the LT-PNNL ATJ process using a variety of ethanol feedstocks demonstrated the viability of a future model of distributed ATJ production, in which ethanol may be produced at multiple facilities from local feedstocks and shipped to a central facility for conversion. The project demonstrated that co-production of chemicals has the potential to reduce jet cost of production, thereby accelerating commercial production of SAJF from biomass.« less

  8. Structural strengthening of rocket nozzle extension by means of laser metal deposition

    NASA Astrophysics Data System (ADS)

    Honoré, M.; Brox, L.; Hallberg, M.

    2012-03-01

    Commercial space operations strive to maximize the payload per launch in order to minimize the costs of each kg launched into orbit; this yields demand for ever larger launchers with larger, more powerful rocket engines. Volvo Aero Corporation in collaboration with Snecma and Astrium has designed and tested a new, upgraded Nozzle extension for the Vulcain 2 engine configuration, denoted Vulcain 2+ NE Demonstrator The manufacturing process for the welding of the sandwich wall and the stiffening structure is developed in close cooperation with FORCE Technology. The upgrade is intended to be available for future development programs for the European Space Agency's (ESA) highly successful commercial launch vehicle, the ARIANE 5. The Vulcain 2+ Nozzle Extension Demonstrator [1] features a novel, thin-sheet laser-welded configuration, with laser metal deposition built-up 3D-features for the mounting of stiffening structure, flanges and for structural strengthening, in order to cope with the extreme load- and thermal conditions, to which the rocket nozzle extension is exposed during launch of the 750 ton ARIANE 5 launcher. Several millimeters of material thickness has been deposited by laser metal deposition without disturbing the intricate flow geometry of the nozzle cooling channels. The laser metal deposition process has been applied on a full-scale rocket nozzle demonstrator, and in excess of 15 kilometers of filler wire has been successfully applied to the rocket nozzle. The laser metal deposition has proven successful in two full-throttle, full-scale tests, firing the rocket engine and nozzle in the ESA test facility P5 by DLR in Lampoldshausen, Germany.

  9. Performance of a Mach-Zehnder based analogue data recording system for use with the Gas Cherenkov Detector on the NIF

    NASA Astrophysics Data System (ADS)

    Carpenter, A. C.; Herrmann, H. W.; Beeman, B. V.; Lopez, F. E.; Hernandez, J. E.

    2016-09-01

    This paper covers the performance of a high speed analogue data transmission system. This system uses multiple Mach- Zehnder optical modulators to transmit and record fusion burn history data for the Gas Cherenkov Detector (GCD) on the National Ignition Facility. The GCD is designed to measure the burn duration of high energy gamma rays generated by Deuterium-Tritium (DT) interactions in the NIF. The burn duration of DT fusion can be as short as 10ps and the optical photons generated in the gas Cherenkov cell are measured using a vacuum photodiode with a FWHM of 55ps. A recording system with a 3dB bandwidth of ≥10GHz and a signal to noise ratio of ≥5 for photodiode output voltage of 50mV is presented. The data transmission system uses two or three Mach-Zehnder modulators and an RF amplifier to transmit data optically. This signal is received and recorded by optical to electrical converts and a high speed digital oscilloscope placed outside of the NIF Target Bay. Electrical performance metrics covered include signal to noise ratio (SNR), signal to peak to peak noise ratio, single shot dynamic range, shot to shot dynamic range, system bandwidth, scattering parameters, are shown. Design considerations such as self-test capabilities, the NIF radiation environment, upgrade compatibility, Mach-Zehnder (MZ) biasing, maintainability, and operating considerations for the use of MZs are covered. This data recording system will be used for the future upgrade of the GCD to be used with a Pulse Dilation PMT, currently under development.

  10. H-mode and Edge Physics on the Pegasus ST: Progress and Future Directions

    NASA Astrophysics Data System (ADS)

    Bongard, M. W.; Bodner, G. M.; Barr, J. L.; Burke, M. G.; Fonck, R. J.; Hinson, E. T.; Kriete, D. M.; Lewicki, B. T.; Perry, J. M.; Reusch, J. A.; Schlossberg, D. J.; Thome, K. E.; Winz, G. R.

    2015-11-01

    Ohmic H-modes are routinely attained on the Pegasus ST, in part due to the low L-H power threshold PLH arising from low-BT operation at A ~ 1 . Characteristics of H-mode include: improved τe, consistent with H98 ~ 1 edge current and pressure pedestal formation; and the occurrence of ELMs. Experiments in the past year have examined magnetic topology and density dependencies of PLH in detail. PLH exceeds ITER L-H scaling values by 10-20 ×, with PLH /PITPA 08 increasing sharply as A --> 1 . No PLH-minimizing density has been found. Unlike at high- A, PLH is insensitive to limited or diverted magnetic topologies to date. The low BT and modest pedestal values at A ~ 1 afford unique edge diagnostic accessibility to investigate ELMs and their nonlinear dynamics. Jedge (R , t) measured through a Type I ELM shows a complex pedestal collapse and filament ejection. These studies are being extended to higher Ip and longer pulse length with LHI startup to conserve Ohmic V-s and improve MHD stability. A modest-cost upgrade to the facility will enable detailed validation studies of nonlinear ELM dynamics and ELM control. This initiative will upgrade the centerstack, increasing BT by × 3 , Ohmic V-s by × 4 , and pulse lengths to 100 ms at A < 1 . 3 , as well as deploy a comprehensive 3D magnetic perturbation coil system with full poloidal coverage from frame coils and helical centerstack windings. Work supported by US DOE grant DE-FG02-96ER54375.

  11. Chapter 24: Strategic Energy Management (SEM) Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stewart, James

    Strategic energy management (SEM) focuses on achieving energy-efficiency improvements through systematic and planned changes in facility operations, maintenance, and behaviors (OM&B) and capital equipment upgrades in large energy-using facilities, including industrial buildings, commercial buildings, and multi-facility organizations such as campuses or communities. Facilities can institute a spectrum of SEM actions, ranging from a simple process for regularly identifying energy-savings actions, to establishing a formal, third-party recognized or certified SEM framework for continuous improvement of energy performance. In general, SEM programs that would be considered part of a utility program will contain a set of energy-reducing goals, principles, and practices emphasizingmore » continuous improvements in energy performance or savings through energy management and an energy management system (EnMS).« less

  12. People, Process and Technology: Strategies for Assuring Sustainable Implementation of EMRs at Public-Sector Health Facilities in Kenya

    PubMed Central

    Kang’a, Samuel G.; Muthee, Veronica M.; Liku, Nzisa; Too, Diana; Puttkammer, Nancy

    2016-01-01

    The Ministry of Health (MoH) rollout of electronic medical record systems (EMRs) has continuously been embraced across health facilities in Kenya since 2012. This has been driven by a government led process supported by PEPFAR that recommended standardized systems for facilities. Various strategies were deployed to assure meaningful and sustainable EMRs implementation: sensitization of leadership; user training, formation of health facility-level multi-disciplinary teams; formation of county-level Technical Working Groups; data migration; routine data quality assessments; point of care adoption; successive release of software upgrades; and power provision. Successes recorded include goodwill and leadership from the county management (22 counties), growth in the number of EMR trained users (2561 health care workers), collaboration in among other things, data migration(90 health facilities completed) and establishment of county TWGs (13 TWGs). Sustenance of EMRs demand across facilities is possible through; county TWGs oversight, timely resolution of users’ issues and provision of reliable power. PMID:28269864

  13. People, Process and Technology: Strategies for Assuring Sustainable Implementation of EMRs at Public-Sector Health Facilities in Kenya.

    PubMed

    Kang'a, Samuel G; Muthee, Veronica M; Liku, Nzisa; Too, Diana; Puttkammer, Nancy

    2016-01-01

    The Ministry of Health (MoH) rollout of electronic medical record systems (EMRs) has continuously been embraced across health facilities in Kenya since 2012. This has been driven by a government led process supported by PEPFAR that recommended standardized systems for facilities. Various strategies were deployed to assure meaningful and sustainable EMRs implementation: sensitization of leadership; user training, formation of health facility-level multi-disciplinary teams; formation of county-level Technical Working Groups; data migration; routine data quality assessments; point of care adoption; successive release of software upgrades; and power provision. Successes recorded include goodwill and leadership from the county management (22 counties), growth in the number of EMR trained users (2561 health care workers), collaboration in among other things, data migration(90 health facilities completed) and establishment of county TWGs (13 TWGs). Sustenance of EMRs demand across facilities is possible through; county TWGs oversight, timely resolution of users' issues and provision of reliable power.

  14. Pyranometer station for the assessment of solar energy influx in eastern New Mexico. Final report, December 12, 1976-June 1, 1978

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sittler, O.D.; Agogino, M.M.

    1979-05-01

    This project was undertaken to improve the data base for estimating solar energy influx in eastern New Mexico. A precision pyranometer station has been established at Eastern New Mexico University in Portales. A program of careful calibration and data management procedures is conducted to maintain high standards of precision and accuracy. Data from the first year of operation were used to upgrade insolation data of moderate accuracy which had been obtained at this site with an inexpensive pyranograph. Although not as accurate as the data expected from future years of operation of this station, these upgraded pyranograph measurements show thatmore » eastern New Mexico receives somewhat less solar energy than would be expected from published data. A detailed summary of these upgraded insolation data is included.« less

  15. Initial results of the high resolution edge Thomson scattering upgrade at DIII-D.

    PubMed

    Eldon, D; Bray, B D; Deterly, T M; Liu, C; Watkins, M; Groebner, R J; Leonard, A W; Osborne, T H; Snyder, P B; Boivin, R L; Tynan, G R

    2012-10-01

    Validation of models of pedestal structure is an important part of predicting pedestal height and performance in future tokamaks. The Thomson scattering diagnostic at DIII-D has been upgraded in support of validating these models. Spatial and temporal resolution, as well as signal to noise ratio, have all been specifically enhanced in the pedestal region. This region is now diagnosed by 20 view-chords with a spacing of 6 mm and a scattering length of just under 5 mm sampled at a nominal rate of 250 Hz. When mapped to the outboard midplane, this corresponds to ~3 mm spacing. These measurements are being used to test critical gradient models, in which pedestal gradients increase in time until a threshold is reached. This paper will describe the specifications of the upgrade and present initial results of the system.

  16. CLARA conceptual design report

    NASA Astrophysics Data System (ADS)

    Clarke, J. A.; Angal-Kalinin, D.; Bliss, N.; Buckley, R.; Buckley, S.; Cash, R.; Corlett, P.; Cowie, L.; Cox, G.; Diakun, G. P.; Dunning, D. J.; Fell, B. D.; Gallagher, A.; Goudket, P.; Goulden, A. R.; Holland, D. M. P.; Jamison, S. P.; Jones, J. K.; Kalinin, A. S.; Liggins, W.; Ma, L.; Marinov, K. B.; Martlew, B.; McIntosh, P. A.; McKenzie, J. W.; Middleman, K. J.; Militsyn, B. L.; Moss, A. J.; Muratori, B. D.; Roper, M. D.; Santer, R.; Saveliev, Y.; Snedden, E.; Smith, R. J.; Smith, S. L.; Surman, M.; Thakker, T.; Thompson, N. R.; Valizadeh, R.; Wheelhouse, A. E.; Williams, P. H.; Bartolini, R.; Martin, I.; Barlow, R.; Kolano, A.; Burt, G.; Chattopadhyay, S.; Newton, D.; Wolski, A.; Appleby, R. B.; Owen, H. L.; Serluca, M.; Xia, G.; Boogert, S.; Lyapin, A.; Campbell, L.; McNeil, B. W. J.; Paramonov, V. V.

    2014-05-01

    This report describes the conceptual design of a proposed free electron laser test facility called CLARA that will be a major upgrade to the existing VELA accelerator test facility at Daresbury Laboratory in the UK. CLARA will be able to test a number of new free electron laser schemes that have been proposed but require a proof of principle experiment to confirm that they perform as predicted. The primary focus of CLARA will be on ultra short photon pulse generation which will take free electron lasers into a whole new regime, enabling a new area of photon science to emerge.

  17. SSPF Operational Upgrades

    NASA Image and Video Library

    2016-11-15

    During a ribbon cutting ceremony in the high bay of the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, center director Bob Cabana, far left, is joined by Bill Dowdell, Kennedy's International Space Station technical director, Josephine Burnett, director of Exploration Research and Technology, Andy Allen, Jacobs vice president and general manager and Test and Operations Support Contract program manager, and Jeff McAlear, Jacobs director of Processing Services. The event celebrated completion of facility modifications to improve processing and free up zones tailored to a variety of needs supporting a robust assortment of space-bound hardware including NASA programs and commercial space companies.

  18. MCC History

    NASA Image and Video Library

    2017-02-12

    Since the days of Gemini all of America’s human spaceflight programs have been controlled by men and women stationed in one of several flight control rooms at NASA’s Johnson Space Center in Houston: the International Space Station flight controllers recently moved into an upgraded facility in the room that hosted the teams during the first manned flights of Apollo and the space shuttle. Here’s a tour of “Mission Control Houston” through the years, from its first generation through the facility ready for the flights of Orion, the spacecraft that will take humans farther into space than they’ve ever gone before.

  19. NASA Glenn Propulsion Systems Lab (PSL) Icing Facility Update

    NASA Technical Reports Server (NTRS)

    Thomas, Queito P.

    2015-01-01

    The NASA Glenn Research Center Propulsion Systems Lab (PSL) was recently upgraded to perform engine inlet ice crystal testing in an altitude environment. The system installed 10 spray bars in the inlet plenum for ice crystal generation using 222 spray nozzles. As an altitude test chamber, PSL is capable of simulation of in-flight icing events in a ground test facility. The system was designed to operate at altitudes from 4,000 ft. to 40,000 ft. at Mach numbers up to 0.8M and inlet total temperatures from -60F to +15F.

  20. Successful MPPF Pneumatics Verification and Validation Testing

    NASA Image and Video Library

    2017-03-28

    Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. To the left are several pneumatic panels. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.

  1. Modernization of the Caltech/USGS Southern California Seismic Network

    NASA Astrophysics Data System (ADS)

    Bhadha, R.; Devora, A.; Hauksson, E.; Johnson, D.; Thomas, V.; Watkins, M.; Yip, R.; Yu, E.; Given, D.; Cone, G.; Koesterer, C.

    2009-12-01

    The USGS/ANSS/ARRA program is providing Government Furnished Equipment (GFE), and two year funding for upgrading the Caltech/USGS Southern California Seismic Network (SCSN). The SCSN is the modern digital ground motion seismic network in southern California that monitors seismicity and provides real-time earthquake information products such as rapid notifications, moment tensors, and ShakeMap. The SCSN has evolved through the years and now consists of several well-integrated components such as Short-Period analog, TERRAscope, digital stations, and real-time strong motion stations, or about 300 stations. In addition, the SCSN records data from about 100 stations provided by partner networks. To strengthen the ability of SCSN to meet the ANSS performance standards, we will install GFE and carry out the following upgrades and improvements of the various components of the SCSN: 1) Upgrade of dataloggers at seven TERRAscope stations; 2) Upgrade of dataloggers at 131 digital stations and upgrade broadband sensors at 25 stations; 3) Upgrade of SCSN metadata capabilities; 4) Upgrade of telemetry capabilities for both seismic and GPS data; and 5) Upgrade balers at stations with existing Q330 dataloggers. These upgrades will enable the SCSN to meet the ANSS Performance Standards more consistently than before. The new equipment will improve station uptimes and reduce maintenance costs. The new equipment will also provide improved waveform data quality and consequently superior data products. The data gaps due to various outages will be minimized, and ‘late’ data will be readily available through retrieval from on-site storage. Compared to the outdated equipment, the new equipment will speed up data delivery by about 10 sec, which is fast enough for earthquake early warning applications. The new equipment also has about a factor of ten lower consumption of power. We will also upgrade the SCSN data acquisition and data center facilities, which will improve the SCSN performance and metadata availability. We will improve existing software to facilitate the update of metadata, and to improve the interoperability between SeisNetWatch and our database of metadata. The improved software will also be made available to other regional networks as part of the CISN software distribution. These upgrades, will greatly improve the robustness of the SCSN, and facilitate higher quality and more reliable earthquake monitoring than was available before in southern California. The modernized SCSN will contribute to more coordinated search and rescue as well as economic resilience following a major earthquake by providing accurate earthquake information, and thus facilitate rapid deployment of field crews and rapid business resumption. Further, advances in seismological research will be facilitated by the high quality seismic data that will be collected in one of the most seismically active areas in the contiguous US.

  2. A General Overview of the Data Acquisition and Controls Systems (DACS) of the E-Complex at NASA's Stennis Space Center

    NASA Technical Reports Server (NTRS)

    Hughes, Mark S.; Hebert, Phillip W.; Davis, Dawn M.; Jensen, Scott L.; Abell, Frederick K., Jr.

    2004-01-01

    The John C. Stennis Space Center (SSC) provides test operations services to a variety of customers, including NASA, DoD, and commercial enterprises for the development of current and next-generation rocket propulsion systems. Many of these testing services are provided in the E-Complex test facilities composed of three active test stands (E1, E2, & E3) and 7 total test positions. Each test position is outfitted with unique sets of data acquisition and controls hardware and software that record both facility and test article data and enable safe operation of the test facility. This paper addresses each system in more detail including efforts to upgrade hardware and software.

  3. KSC-98pc1162

    NASA Image and Video Library

    1998-09-27

    KENNEDY SPACE CENTER, FLA. -- The Shuttle Carrier Aircraft rolls to a stop with its piggyback cargo orbiter Atlantis at the Shuttle Landing Facility. In the background is the Vehicle Assembly Building. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  4. KSC-98pc1163

    NASA Image and Video Library

    1998-09-27

    KENNEDY SPACE CENTER, FLA. -- Stairs are rolled to the forward opening of the Shuttle Carrier Aircraft with its piggyback cargo, the orbiter Atlantis after it rolls to a stop at the Shuttle Landing Facility. Atlantis returns home after a 10-month stay in the Palmdale, CA, orbiter processing facility undergoing extensive inspections and modifications. They included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. The flight from Palmdale included a fueling stop in Ft. Hood, TX, and overnight stay at Ft. Campbell, KY. Atlantis will undergo preparations in the Orbiter Processing Facility at KSC for its planned flight in June 1999

  5. Upgrading of the STP Uithoorn: treatment of nutrient rich wastewater from horticulture.

    PubMed

    Piekema, P; Neef, R

    2005-01-01

    The STP Uithoorn will be upgraded to accommodate the treatment of wastewater from a growing population and to meet more stringent nutrient discharge limits in 2006. In 2003 a system choice and preliminary design was made for the upgrading. A special feature is the nutrient rich wastewater flow from the rapidly developing horticulture in the area. Since the future loads from horticulture are highly uncertain, flexibility of the STP after upgrading is an important issue. A three stage system was selected: improved physical-chemical primary treatment, secondary treatment by activated sludge, and tertiary treatment by denitrifying filters. In this way an important part of the existing infrastructure can be reused, and flexibility is assured by constructing the tertiary treatment in modules and by providing a wide range of operational control possibilities. In this paper the process of system choice and selection of type of tertiary treatment are described, as well as the optimisation of the existing treatment. In order to determine the feasibility of allowing a high loading rate on the existing secondary clarifiers, a two-dimensional hydraulic model of the clarification process was used.

  6. A clinical assessment of cochlear implant recipient performance: implications for individualized map settings in specific environments.

    PubMed

    Hey, Matthias; Hocke, Thomas; Mauger, Stefan; Müller-Deile, Joachim

    2016-11-01

    Individual speech intelligibility was measured in quiet and noise for cochlear Implant recipients upgrading from the Freedom to the CP900 series sound processor. The postlingually deafened participants (n = 23) used either Nucleus CI24RE or CI512 cochlear implant, and currently wore a Freedom sound processor. A significant group mean improvement in speech intelligibility was found in quiet (Freiburg monosyllabic words at 50 dB SPL ) and in noise (adaptive Oldenburger sentences in noise) for the two CP900 series SmartSound programs compared to the Freedom program. Further analysis was carried out on individual's speech intelligibility outcomes in quiet and in noise. Results showed a significant improvement or decrement for some recipients when upgrading to the new programs. To further increase speech intelligibility outcomes when upgrading, an enhanced upgrade procedure is proposed that includes additional testing with different signal-processing schemes. Implications of this research are that future automated scene analysis and switching technologies could provide additional performance improvements by introducing individualized scene-dependent settings.

  7. Feedback-controlled NTM stabilization on ASDEX Upgrade

    NASA Astrophysics Data System (ADS)

    Stober, J.; Barrera, L.; Behler, K.; Bock, A.; Buhler, A.; Eixenberger, H.; Giannone, L.; Kasparek, W.; Maraschek, M.; Mlynek, A.; Monaco, F.; Poli, E.; Rapson, C. J.; Reich, M.; Schubert, M.; Treutterer, W.; Wagner, D.; Zohm, H.

    2015-03-01

    On ASDEX Upgrade a concept for real-time stabilization of NTMs has been realized and successfully applied to (3,2)- and (2,1)-NTMs. Since most of the work has meanwhile been published elsewhere, a short summary with the appropriate references is given. Limitations, deficits and future extensions of the system are discussed. In a second part the recent work on using modulated ECCD for NTM stabilisation is described in some detail. In these experiments ECCD power is modulated according to a magnetic footprint of the rotating NTM. In agreement with earlier results it could be shown that O-point heating reduces the necessary average power for stabilisation whereas X-point heating hampers stabilisation. Although this modulated scheme is not relevant for routine NTM stabilisation on ASDEX Upgrade it may be mandatory for ITER or DEMO. On ASDEX Upgrade it has been re-developed to demonstrate the usage of a FAst DIrectional Switch to continously heat the O-point of the rotating island with only one gyrotron switching between two launchers which target the mode at locations separated in phase by 180 degrees as described in [1].

  8. Upgrade of the beam extraction system of the GTS-LHC electron cyclotron resonance ion source at CERN.

    PubMed

    Toivanen, V; Bellodi, G; Dimov, V; Küchler, D; Lombardi, A M; Maintrot, M

    2016-02-01

    Linac3 is the first accelerator in the heavy ion injector chain of the Large Hadron Collider (LHC), providing multiply charged heavy ion beams for the CERN experimental program. The ion beams are produced with GTS-LHC, a 14.5 GHz electron cyclotron resonance ion source, operated in afterglow mode. Improvement of the GTS-LHC beam formation and beam transport along Linac3 is part of the upgrade program of the injector chain in preparation for the future high luminosity LHC. A mismatch between the ion beam properties in the ion source extraction region and the acceptance of the following Low Energy Beam Transport (LEBT) section has been identified as one of the factors limiting the Linac3 performance. The installation of a new focusing element, an einzel lens, into the GTS-LHC extraction region is foreseen as a part of the Linac3 upgrade, as well as a redesign of the first section of the LEBT. Details of the upgrade and results of a beam dynamics study of the extraction region and LEBT modifications will be presented.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bucholz, J.A.

    The High Flux Isotope Reactor (HFIR) at the Oak Ridge National Laboratory is in the midst of a massive upgrade program to enhance experimental facilities. The reactor presently has four horizontal experimental beam tubes, all of which will be replaced or redesigned. The HB-2 beam tube will be enlarged to support more guide tubes, while the HB-4 beam tube will soon include a cold neutron source.

  10. Environmental Assessment of Construction of Antenna Parts Storage Facility, Upgrade of Perimeter Security Fence, Demolition of Storage Shed, Hawkinsville Air Force Space Surveillance Station, Hawkinsville, Georgia

    DTIC Science & Technology

    2012-11-01

    the most common. Japanese honeysuckle and Chinese tallow are limited to are- as along the fence line, and mimosa was only found in two locations at the...HAWKINSVILLE AFSSS Scientific Name Common Name Albizia julibrissin* mimosa Ampelopsis arborea peppervine Andropogon virginicus broomsedge bluestem

  11. Visitor perceptions of the benefits of local park

    Treesearch

    Deborah Kerstetter; Andrew Mowen; Nathan Trauntvein; Toni Leichty; Nuno Rubiero

    2009-01-01

    Recent research regarding the perceived benefits of local parks has been limited, posing a problem for recreation and park directors who must promote the value of and gain support for aging park facilities. To collect evidence concerning the value of local parks and the impact of park upgrades, we conducted a study with one local park to (a) document behavioral changes...

  12. DoD Key Technologies Plan

    DTIC Science & Technology

    1992-07-01

    methodologies ; software performance analysis; software testing; and concurrent languages. Finally, efforts in algorithms, which are primarily designed to upgrade...These codes provide a powerful research tool for testing new concepts and designs prior to experimental implementation. DoE’s laser program has also...development, and specially designed production facilities. World leadership in bth non -fluorinated and fluorinated materials resides in the U.S. but Japan

  13. Smart Start and Preschool Child Care Quality in North Carolina: Change Over Time and Relation to Children's Readiness.

    ERIC Educational Resources Information Center

    Bryant, Donna; Maxwell, Kelly; Taylor, Karen; Poe, Michele; Peisner-Feinberg, Ellen; Bernier, Kathleen

    The primary goal of Smart Start is to ensure that all children enter school healthy and prepared to succeed. Smart Start has funded a variety of technical assistance (TA) activities to improve child care, including on-site technical assistance, quality improvement and facility grant, teacher education scholarships, license upgrades, teacher salary…

  14. Strategic Priorities for Improving Access to Quality Education in the Kurdistan Region--Iraq. Monograph

    ERIC Educational Resources Information Center

    Vernez, Georges; Culbertson, Shelly; Constant, Louay

    2014-01-01

    The Kurdistan Regional Government (KRG) began an ambitious reform of the Kurdistan Region of Iraq's (KRI's) kindergarten through grade 12 (K-12) education system beginning in 2007 in an effort to modernize the curriculum, upgrade school facilities, and raise the quality of instruction. In 2010, RAND was asked to conduct a one-year study to assess…

  15. Vehicle Assembly Building (VAB)

    NASA Image and Video Library

    2017-09-27

    NASA's Vehicle Assembly Building at Kennedy Space Center in Florida was used to assemble and house American-crewed launch vehicles from 1968 to 2011. AT 3,684,883 cubic meters, it is one of the largest buildings in the world by volume. Inside the facility, High Bay 3 is being upgraded and modified to support processing of the agency's Space Launch System rocket and Orion spacecraft.

  16. New Phone System Coming to NCI Campus at Frederick | Poster

    Cancer.gov

    By Travis Fouche and Trent McKee, Guest Writers Beginning in September, phones at the NCI Campus at Frederick will begin to be replaced, as the project to upgrade the current phone system ramps up. Over the next 16 months, the Information Systems Program (ISP) will be working with Facilities Maintenance and Engineering and Computer & Statistical Services to replace the current

  17. Smiths Medical Medfusion 3010a syringe pump may overinfuse if software is outdated.

    PubMed

    2010-04-01

    Smiths Medical Medfusion 3010a syringe pumps that aren't equipped with the latest software version (2.0.6) could overinfuse if the "recall last settings" function is used following an infusion in volume/time mode. If your facility has pumps equipped with software versions older than 2.0.6, contact Smiths Medical to obtain an upgrade.

  18. Hybrid Wing Body Aircraft Acoustic Test Preparations and Facility Upgrades

    NASA Technical Reports Server (NTRS)

    Heath, Stephanie L.; Brooks, Thomas F.; Hutcheson, Florence V.; Doty, Michael J.; Haskin, Henry H.; Spalt, Taylor B.; Bahr, Christopher J.; Burley, Casey L.; Bartram, Scott M.; Humphreys, William M.; hide

    2013-01-01

    NASA is investigating the potential of acoustic shielding as a means to reduce the noise footprint at airport communities. A subsonic transport aircraft and Langley's 14- by 22-foot Subsonic Wind Tunnel were chosen to test the proposed "low noise" technology. The present experiment studies the basic components of propulsion-airframe shielding in a representative flow regime. To this end, a 5.8-percent scale hybrid wing body model was built with dual state-of-the-art engine noise simulators. The results will provide benchmark shielding data and key hybrid wing body aircraft noise data. The test matrix for the experiment contains both aerodynamic and acoustic test configurations, broadband turbomachinery and hot jet engine noise simulators, and various airframe configurations which include landing gear, cruise and drooped wing leading edges, trailing edge elevons and vertical tail options. To aid in this study, two major facility upgrades have occurred. First, a propane delivery system has been installed to provide the acoustic characteristics with realistic temperature conditions for a hot gas engine; and second, a traversing microphone array and side towers have been added to gain full spectral and directivity noise characteristics.

  19. The growth of the UniTree mass storage system at the NASA Center for Computational Sciences: Some lessons learned

    NASA Technical Reports Server (NTRS)

    Tarshish, Adina; Salmon, Ellen

    1994-01-01

    In October 1992, the NASA Center for Computational Sciences made its Convex-based UniTree system generally available to users. The ensuing months saw growth in every area. Within 26 months, data under UniTree control grew from nil to over 12 terabytes, nearly all of it stored on robotically mounted tape. HiPPI/UltraNet was added to enhance connectivity, and later HiPPI/TCP was added as well. Disks and robotic tape silos were added to those already under UniTree's control, and 18-track tapes were upgraded to 36-track. The primary data source for UniTree, the facility's Cray Y-MP/4-128, first doubled its processing power and then was replaced altogether by a C98/6-256 with nearly two-and-a-half times the Y-MP's combined peak gigaflops. The Convex/UniTree software was upgraded from version 1.5 to 1.7.5, and then to 1.7.6. Finally, the server itself, a Convex C3240, was upgraded to a C3830 with a second I/O bay, doubling the C3240's memory and capacity for I/O. This paper describes insights gained and reinforced with the burgeoning demands on the UniTree storage system and the significant increases in performance gained from the many upgrades.

  20. Preliminary Study of Methods for Upgrading USGS Antarctic Seismological Capability

    USGS Publications Warehouse

    Holcomb, L. Gary

    1982-01-01

    Purpose The purpose of this study is to evaluate potential methods for obtaining higher quality seismic data from Antarctica. Currently, USGS-sponsored WWSSN stations are located at Scott Base, Sanae Base, and at South Pole Station. Scott and Sanae Stations are located near the coast; data obtained from coastal installations are normally degraded by noise generated by ocean wave action on the coast. Operations at South Pole are rather difficult because of the severe environmental characteristics and the extended logistics which are required to provide supplies and operating personnel to its remote location. Short-period data quality from Pole Station has been moderately high with a short-period magnification of 100K at 1Hz. Long-period magnifications have been rather low (<1K @ 15 s period). Recent relocation of the seismic recording facilities at South Pole Station as a result of the construction of a completely new station facility has caused serious degradation of the data quality due to faulty installation techniques. Repairs have been implemented to remedy these deficiencies and to regain the data quality which existed before the move to new facilities. However, the technology being used at South Pole Station is of WWSSN vintage; as a result it is about 20 years old. Much has been learned about achieving higher magnifications since the WWSSN was designed. This study will evaluate the feasibility of applying recent technological advances to Antarctic seismology. Seismological data from the Antarctic Continent is important to the world's seismological community because of the Antarctic's unique geographic position on the globe. Land masses are scarce in that part of the world; the Antarctic sits right in the middle of the void. Therefore, its data are important for completing the data set for the southern hemisphere. Upgrading the USGS seismic capability in the Antarctic should also prove to be a wise investment from another point of view. Although the initial costs of the Antarctic upgrade program would be high, and the cost of routine maintenance and support would be greater than in other parts of the world, the ease of upgrading is aided by the unique nonpolitical aspect of the continent. In addition, the danger of losing our investment due to political unrest or change is almost zero. In the past, political complications have severely impacted operations at several SRO stations. Therefore, an effort to improve data quality from the Antarctic would be a prudent long-term investment.

  1. The SIAM Photon Source

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pairsuwan, Weerapong

    A short history of the SIAM Photon Source in Thailand is described. The facility is based on the 1 GeV storage ring obtained from the SORTEC consortium in Japan. After a redesign to include insertion straight sections it produced the first light in December 2001 and the first beam line became operational in early 2002. Special difficulties appear when a synchrotron light facility is obtained by donation, which have mostly to do with the absence of human resource development that elsewhere is commonly accomplished during design and construction. Additional problems arise by the distance of a developing country like Thailandmore » from the origin of technical parts of the donation. A donation does not provide time to generate local capabilities or include in the technical design locally obtainable parts. This makes future developments, repairs and maintenance more time consuming, difficult and expensive than it should be. In other cases, parts of components are proprietary or obsolete or both which requires redesign and engineering at a time when the replacement part should be available to prevent stoppage of operation.The build-up of a user community is very difficult, especially when the radiation spectrum is confined to the VUV regime. Most of scientific interest these days is focused on the x-ray regime. Due to its low beam energy, the SIAM storage ring did not produce useful x-ray intensities and we are therefore in the midst of an upgrade to produce harder radiation. The first step has been achieved with a 20% increase of energy to 1.2 GeV. This step shifts the critical photon energy of bending magnet radiation from 800 eV to 1.4 keV providing useful radiation up to 7 keV. A XAS-beam line has been completed in 2005 and experimentation is very active by now. The next step is to install a 6.4 T wavelength shifter by the end of 2006 resulting in a critical photon energy of 6.15 keV. Further upgrades are planed for the comming years.« less

  2. Reusable Rack Interface Controller Common Software for Various Science Research Racks on the International Space Station

    NASA Technical Reports Server (NTRS)

    Lu, George C.

    2003-01-01

    The purpose of the EXPRESS (Expedite the PRocessing of Experiments to Space Station) rack project is to provide a set of predefined interfaces for scientific payloads which allow rapid integration into a payload rack on International Space Station (ISS). VxWorks' was selected as the operating system for the rack and payload resource controller, primarily based on the proliferation of VME (Versa Module Eurocard) products. These products provide needed flexibility for future hardware upgrades to meet everchanging science research rack configuration requirements. On the International Space Station, there are multiple science research rack configurations, including: 1) Human Research Facility (HRF); 2) EXPRESS ARIS (Active Rack Isolation System); 3) WORF (Window Observational Research Facility); and 4) HHR (Habitat Holding Rack). The RIC (Rack Interface Controller) connects payloads to the ISS bus architecture for data transfer between the payload and ground control. The RIC is a general purpose embedded computer which supports multiple communication protocols, including fiber optic communication buses, Ethernet buses, EIA-422, Mil-Std-1553 buses, SMPTE (Society Motion Picture Television Engineers)-170M video, and audio interfaces to payloads and the ISS. As a cost saving and software reliability strategy, the Boeing Payload Software Organization developed reusable common software where appropriate. These reusable modules included a set of low-level driver software interfaces to 1553B. RS232, RS422, Ethernet buses, HRDL (High Rate Data Link), video switch functionality, telemetry processing, and executive software hosted on the FUC computer. These drivers formed the basis for software development of the HRF, EXPRESS, EXPRESS ARIS, WORF, and HHR RIC executable modules. The reusable RIC common software has provided extensive benefits, including: 1) Significant reduction in development flow time; 2) Minimal rework and maintenance; 3) Improved reliability; and 4) Overall reduction in software life cycle cost. Due to the limited number of crew hours available on ISS for science research, operational efficiency is a critical customer concern. The current method of upgrading RIC software is a time consuming process; thus, an improved methodology for uploading RIC software is currently under evaluation.

  3. Functions and requirements for tank farm restoration and safe operations, Project W-314. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garrison, R.C.

    1995-02-01

    This Functions and Requirements document (FRD) establishes the basic performance criteria for Project W-314, in accordance with the guidance outlined in the letter from R.W. Brown, RL, to President, WHC, ``Tank Waste Remediation System (TWRS) Project Documentation Methodology,`` 94-PRJ-018, dated 3/18/94. The FRD replaces the Functional Design Criteria (FDC) as the project technical baseline documentation. Project W-314 will improve the reliability of safety related systems, minimize onsite health and safety hazards, and support waste retrieval and disposal activities by restoring and/or upgrading existing Tank Farm facilities and systems. The scope of Project W-314 encompasses the necessary restoration upgrades of themore » Tank Farms` instrumentation, ventilation, electrical distribution, and waste transfer systems.« less

  4. Upgrade of the SPIRAL identification station for high-precision measurements of nuclear β decay

    NASA Astrophysics Data System (ADS)

    Grinyer, G. F.; Thomas, J. C.; Blank, B.; Bouzomita, H.; Austin, R. A. E.; Ball, G. C.; Bucaille, F.; Delahaye, P.; Finlay, P.; Frémont, G.; Gibelin, J.; Giovinazzo, J.; Grinyer, J.; Kurtukian-Nieto, T.; Laffoley, A. T.; Leach, K. G.; Lefèvre, A.; Legruel, F.; Lescalié, G.; Perez-Loureiro, D.

    2014-03-01

    The low-energy identification station at SPIRAL (Système de Production d'Ions Radioactifs Accélérés en Ligne) has been upgraded for studying the β decays of short-lived radioactive isotopes and to perform high-precision half-life and branching-ratio measurements for superallowed Fermi and isospin T=1/2 mirror β decays. These new capabilities, combined with an existing Paul trap setup for measurements of β-ν angular-correlation coefficients, provide a powerful facility for investigating fundamental properties of the electroweak interaction through nuclear β decays. A detailed description of the design study, construction, and first results obtained from an in-beam commissioning experiment on the β+ decays 14 O and 17F are presented.

  5. Space reactor fuel element testing in upgraded TREAT

    NASA Astrophysics Data System (ADS)

    Todosow, M.; Bezler, P.; Ludewig, H.; Kato, W. Y.

    The testing of candidate fuel elements at prototypic operating conditions with respect to temperature, power density, hydrogen coolant flow rate, etc.; a crucial component in the development and qualification of nuclear rocket engines based on the Particle Bed Reactor (PBR); NERVA-derivative; and other concepts are discussed. Such testing may be performed at existing reactors, or at new facilities. A scoping study has been performed to assess the feasibility of testing PBR based fuel elements at the TREAT reactor. Initial results suggest that full-scale PBR elements could be tested at an average energy deposition of approximately 60-80 MW-s/L in the current TREAT reactor. If the TREAT reactor was upgraded to include fuel elements with a higher temperature limit, average energy deposition of approximately 100 MW/L may be achievable.

  6. Space reactor fuel element testing in upgraded TREAT

    NASA Astrophysics Data System (ADS)

    Todosow, Michael; Bezler, Paul; Ludewig, Hans; Kato, Walter Y.

    1993-01-01

    The testing of candidate fuel elements at prototypic operating conditions with respect to temperature, power density, hydrogen coolant flow rate, etc., is a crucial component in the development and qualification of nuclear rocket engines based on the Particle Bed Reactor (PBR), NERVA-derivative, and other concepts. Such testing may be performed at existing reactors, or at new facilities. A scoping study has been performed to assess the feasibility of testing PBR based fuel elements at the TREAT reactor. Initial results suggests that full-scale PBR elements could be tested at an average energy deposition of ˜60-80 MW-s/L in the current TREAT reactor. If the TREAT reactor was upgraded to include fuel elements with a higher temperture limit, average energy deposition of ˜100 MW/L may be achievable.

  7. Diagnostics Upgrades for Investigations of HOM Effects in TESLA-type SCRF Cavities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lumpkin, A. H.; Edstrom Jr., D.; Ruan, J.

    We describe the upgrades to diagnostic capabilities on the Fermilab Accelerator Science and Technology (FAST) electron linear accelerator that will allow investigations of the effects of high-order modes (HOMs) in SCRF cavities on macropulse-average beam quality. We examine the dipole modes in the first pass-band generally observed in the 1.6-1.9 GHz regime for TESLA-type SCRF cavities due to uniform transverse beam offsets of the electron beam. Such cavities are the basis of the accelerators such as the European XFEL and the proposed MaRIE XFEL facility. Preliminary HOM detector data, prototype BPM test data, and first framing camera OTR data withmore » ~20- micron spatial resolution at 250 pC per bunch will be presented.« less

  8. Microprocessor tester for the treat upgrade reactor trip system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lenkszus, F.R.; Bucher, R.G.

    1984-01-01

    The upgrading of the Transient Reactor Test (TREAT) Facility at ANL-Idaho has been designed to provide additional experimental capabilities for the study of core disruptive accident (CDA) phenomena. In addition, a programmable Automated Reactor Control System (ARCS) will permit high-power transients up to 11,000 MW having a controlled reactor period of from 15 to 0.1 sec. These modifications to the core neutronics will improve simulation of LMFBR accident conditions. Finally, a sophisticated, multiply-redundant safety system, the Reactor Trip System (RTS), will provide safe operation for both steady state and transient production operating modes. To insure that this complex safety systemmore » is functioning properly, a Dedicated Microprocessor Tester (DMT) has been implemented to perform a thorough checkout of the RTS prior to all TREAT operations.« less

  9. Advances in instrumentation at the W. M. Keck Observatory

    NASA Astrophysics Data System (ADS)

    Adkins, Sean M.; Armandroff, Taft E.; Johnson, James; Lewis, Hilton A.; Martin, Christopher; McLean, Ian S.; Wizinowich, Peter

    2012-09-01

    In this paper we describe both recently completed instrumentation projects and our current development efforts in terms of their role in the strategic plan, the key science areas they address, and their performance as measured or predicted. Projects reaching completion in 2012 include MOSFIRE, a near IR multi-object spectrograph, a laser guide star adaptive optics facility on the Keck I telescope, and an upgrade to the guide camera for the HIRES instrument on Keck I. Projects in development include a new seeing limited integral field spectrograph for the visible wavelength range called the Keck Cosmic Web Imager (KCWI), an upgrade to the telescope control systems on both Keck telescopes, a near-IR tip/tilt sensor for the Keck I adaptive optics system, and a new grating for the OSIRIS integral field spectrograph.

  10. Energy and Cost Optimized Technology Options to Meet Energy Needs of Food Processors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Makhmalbaf, Atefe; Srivastava, Viraj; Hoffman, Michael G.

    Full Paper Submission for: Combined cooling, heating and electric power (CCHP) distributed generation (DG) systems can provide electric power and, heating and cooling capability to commercial and industrial facilities directly onsite, while increasing energy efficiency, security of energy supply, grid independence and enhancing the environmental and economic situation for the site. Food processing industries often have simultaneous requirements for heat, steam, chilling and electricity making them well suited for the use of such systems to supply base-load or as peak reducing generators enabling reduction of overall energy use intensity. This paper documents analysis from a project evaluating opportunities enabled bymore » CCHPDG for emission and cost reductions and energy storage systems installed onsite at food processing facilities. In addition, this distributed generation coupled with energy storage demonstrates a non-wires solution to delay or eliminate the need for upgrades to electric distribution systems. It was found that a dairy processing plant in the Pacific Northwest currently purchasing 15,000 MWh/yr of electricity and 190,000 MMBtu/yr of gas could be provided with a 1.1 MW CCHP system reducing the amount of electric power purchased to 450 MWh/yr while increasing the gas demand to 255,000 MMBtu/yr. The high percentage of hydro-power in this region resulted in CO2 emissions from CCHP to be higher than that attributed to the electric utility/regional energy mix. The value of this work is in documenting a real-world example demonstrating the value of CCHP to facility owners and financial decision makers to encourage them to more seriously consider CCHP systems when building or upgrading facilities.« less

  11. Achieving walkable city in Indonesia: Policy and responsive design through public participation

    NASA Astrophysics Data System (ADS)

    Tanan, Natalia; Darmoyono, Laksmi

    2017-11-01

    This paper discusses approaches to policy and planning of pedestrian facility that facilitate walking in cities in Indonesia. It applies quantitative and qualitative methods to analyze walkability in some cities. The new perspective in policy and planning are focusing on improving non-motorized mobility; it encourages walking and put the provision of the pedestrian facility as an integral part of built environmental planning and development. The policy perceives pedestrian facility in broad, not only about physical development, but also benefit to socioeconomic activity and environmental quality. It is expected that the implementation of policies and walkability concept could upgrade the pedestrian facility, as a walkable city delivers green atmosphere of the urban environment. A design competition of pedestrian facility was held to test the policy and accommodate input from the public. Public participation through competition also enriches the design of pedestrian facility that responsive to local condition. Implementation is still a challenge due to limited budget; however, there are tendencies that few cities improve pedestrian facilities to encourage people walking in order to make the city livable and environmentally friendly.

  12. Thermal Testing of Woven TPS Materials in Extreme Entry Environments

    NASA Technical Reports Server (NTRS)

    Gonzales, G.; Stackpoole, M.

    2014-01-01

    NASAs future robotic missions to Venus and outer planets, namely, Saturn, Uranus, Neptune, result in extremely high entry conditions that exceed the capabilities of current mid density ablators (PICA or Avcoat). Therefore mission planners assume the use of a fully dense carbon phenolic heatshield similar to what was flown on Pioneer Venus and Galileo. Carbon phenolic (CP) is a robust TPS however its high density and thermal conductivity constrain mission planners to steep entries, high heat fluxes, high pressures and short entry durations, in order for CP to be feasible from a mass perspective. In 2012 the Game Changing Development Program in NASAs Space Technology Mission Directorate funded NASA ARC to investigate the feasibility of a Woven Thermal Protection System to meet the needs of NASAs most challenging entry missions. The high entry conditions pose certification challenges in existing ground based test facilities. Recent updates to NASAs IHF and AEDCs H3 high temperature arcjet test facilities enable higher heatflux (2000 Wcm2) and high pressure (5 atm) testing of TPS. Some recent thermal tests of woven TPS will be discussed in this paper. These upgrades have provided a way to test higher entry conditions of potential outer planet and Venus missions and provided a baseline against carbon phenolic material. The results of these tests have given preliminary insight to sample configuration and physical recession profile characteristics.

  13. The Space Systems Environmental Test Facility Database (SSETFD), Website Development Status

    NASA Technical Reports Server (NTRS)

    Snyder, James M.

    2008-01-01

    The Aerospace Corporation has been developing a database of U.S. environmental test laboratory capabilities utilized by the space systems hardware development community. To date, 19 sites have been visited by The Aerospace Corporation and verbal agreements reached to include their capability descriptions in the database. A website is being developed to make this database accessible by all interested government, civil, university and industry personnel. The website will be accessible by all interested in learning more about the extensive collective capability that the US based space industry has to offer. The Environments, Test & Assessment Department within The Aerospace Corporation will be responsible for overall coordination and maintenance of the database. Several US government agencies are interested in utilizing this database to assist in the source selection process for future spacecraft programs. This paper introduces the website by providing an overview of its development, location and search capabilities. It will show how the aerospace community can apply this new tool as a way to increase the utilization of existing lab facilities, and as a starting point for capital expenditure/upgrade trade studies. The long term result is expected to be increased utilization of existing laboratory capability and reduced overall development cost of space systems hardware. Finally, the paper will present the process for adding new participants, and how the database will be maintained.

  14. Testbeam results of irradiated ams H18 HV-CMOS pixel sensor prototypes

    NASA Astrophysics Data System (ADS)

    Benoit, M.; Braccini, S.; Casse, G.; Chen, H.; Chen, K.; Di Bello, F. A.; Ferrere, D.; Golling, T.; Gonzalez-Sevilla, S.; Iacobucci, G.; Kiehn, M.; Lanni, F.; Liu, H.; Meng, L.; Merlassino, C.; Miucci, A.; Muenstermann, D.; Nessi, M.; Okawa, H.; Perić, I.; Rimoldi, M.; Ristić, B.; Barrero Pinto, M. Vicente; Vossebeld, J.; Weber, M.; Weston, T.; Wu, W.; Xu, L.; Zaffaroni, E.

    2018-02-01

    HV-CMOS pixel sensors are a promising option for the tracker upgrade of the ATLAS experiment at the LHC, as well as for other future tracking applications in which large areas are to be instrumented with radiation-tolerant silicon pixel sensors. We present results of testbeam characterisations of the 4th generation of Capacitively Coupled Pixel Detectors (CCPDv4) produced with the ams H18 HV-CMOS process that have been irradiated with different particles (reactor neutrons and 18 MeV protons) to fluences between 1× 1014 and 5× 1015 1-MeV- neq. The sensors were glued to ATLAS FE-I4 pixel readout chips and measured at the CERN SPS H8 beamline using the FE-I4 beam telescope. Results for all fluences are very encouraging with all hit efficiencies being better than 97% for bias voltages of 85 V. The sample irradiated to a fluence of 1× 1015 neq—a relevant value for a large volume of the upgraded tracker—exhibited 99.7% average hit efficiency. The results give strong evidence for the radiation tolerance of HV-CMOS sensors and their suitability as sensors for the experimental HL-LHC upgrades and future large-area silicon-based tracking detectors in high-radiation environments.

  15. SOFIA Science Instruments: Commissioning, Upgrades and Future Opportunities

    NASA Technical Reports Server (NTRS)

    Smith, Erin C.

    2014-01-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is the world's largest airborne observatory, featuring a 2.5 meter telescope housed in the aft section of a Boeing 747sp aircraft. SOFIA's current instrument suite includes: FORCAST (Faint Object InfraRed CAmera for the SOFIA Telescope), a 5-40 µm dual band imager/grism spectrometer developed at Cornell University; HIPO (High-speed Imaging Photometer for Occultations), a 0.3-1.1 micron imager built by Lowell Observatory; FLITECAM (First Light Infrared Test Experiment CAMera), a 1-5 micron wide-field imager/grism spectrometer developed at UCLA; FIFI-LS (Far-Infrared Field-Imaging Line Spectrometer), a 42-210 micron IFU grating spectrograph completed by University Stuttgart; and EXES (Echelon-Cross- Echelle Spectrograph), a 5-28 micron high-resolution spectrometer being completed by UC Davis and NASA Ames. A second generation instrument, HAWC+ (Highresolution Airborne Wideband Camera), is a 50-240 micron imager being upgraded at JPL to add polarimetry and new detectors developed at GSFC. SOFIA will continually update its instrument suite with new instrumentation, technology demonstration experiments and upgrades to the existing instrument suite. This paper details instrument capabilities and status as well as plans for future instrumentation, including the call for proposals for 3rd generation SOFIA science instruments.

  16. Human Factors Principles in Information Dashboard Design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hugo, Jacques V.; St. Germain, Shawn

    When planning for control room upgrades, nuclear power plants have to deal with a multitude of engineering and operational impacts. This will inevitably include several human factors considerations, including physical ergonomics of workstations, viewing angles, lighting, seating, new communication requirements, and new concepts of operation. In helping nuclear power utilities to deal with these challenges, the Idaho National Laboratory (INL) has developed effective methods to manage the various phases of the upgrade life cycle. These methods focus on integrating human factors engineering processes with the plant’s systems engineering process, a large part of which is the development of end-state conceptsmore » for control room modernization. Such an end-state concept is a description of a set of required conditions that define the achievement of the plant’s objectives for the upgrade. Typically, the end-state concept describes the transition of a conventional control room, over time, to a facility that employs advanced digital automation technologies in a way that significantly improves system reliability, reduces human and control room-related hazards, reduces system and component obsolescence, and significantly improves operator performance. To make the various upgrade phases as concrete and as visible as possible, an end-state concept would include a set of visual representations of the control room before and after various upgrade phases to provide the context and a framework within which to consider the various options in the upgrade. This includes the various control systems, human-system interfaces to be replaced, and possible changes to operator workstations. This paper describes how this framework helps to ensure an integrated and cohesive outcome that is consistent with human factors engineering principles and also provide substantial improvement in operator performance. The paper further describes the application of this integrated approach in the strategic modernization program at a nuclear power plant where legacy systems are upgraded to advanced digital technologies through a systematic process that links human factors principles to the systems engineering process. This approach will help to create an integrated control room architecture beyond what is possible for individual subsystem upgrades alone. In addition, several human factors design and evaluation methods were used to develop the end-state concept, including interactive sessions with operators in INL’s Human System Simulation Laboratory, three-dimensional modeling to visualize control board changes.« less

  17. LHC Status and Upgrade Challenges

    NASA Astrophysics Data System (ADS)

    Smith, Jeffrey

    2009-11-01

    The Large Hadron Collider has had a trying start-up and a challenging operational future lays ahead. Critical to the machine's performance is controlling a beam of particles whose stored energy is equivalent to 80 kg of TNT. Unavoidable beam losses result in energy deposition throughout the machine and without adequate protection this power would result in quenching of the superconducting magnets. A brief overview of the machine layout and principles of operation will be reviewed including a summary of the September 2008 accident. The current status of the LHC, startup schedule and upgrade options to achieve the target luminosity will be presented.

  18. Indissoluble Connection of Russian MC&A System Sustainability with that of the Russian Methodological & Training Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryazanov, Boris G.; Goryunov, Victor; Pshakin, Gennady M.

    During the past 10 years of collaboration under the U.S.-Russian Materials Protection, Control and Accounting (MPC&A) Program great efforts were made to transform and upgrade the Russian Federal Nuclear Materials Control and Accounting (MC&A) System. The efforts were focused not only on MC&A systems for nuclear facilities but also on creating and developing the system infrastructure, including legislation, state inspection and agency monitoring, training of operators and inspectors, instrument and methodological support, and the Federal Information System (FIS). At present the most important and urgent goal is to provide sustainability of MC&A systems at the existing level or at themore » level that will be achieved in 2007-2008. Since the very beginning of the program, the Russian Methodological and Training Center (RMTC) activities have been focused on intensive training of the personnel as well as the methodological support necessary for transformation and development of the entire system and its elements located at nuclear facilities. Sustainability of the federal MC&A system is impossible without advanced training of personnel and methodological support for upgrading of system elements at nuclear facilities. That is why the RMTC sustainability is one of the key conditions required for the system sustainability as a whole. The paper presents the results of analysis of the conditions for the Russian MC&A system sustainable development in conjunction with the RMTC sustainability.« less

  19. The 6.5-m MMT Telescope: status and plans for the future

    NASA Astrophysics Data System (ADS)

    Williams, G. Grant; Ortiz, R.; Goble, W.; Gibson, J. D.

    2016-08-01

    The MMT Observatory, a joint venture of the Smithsonian Institution and the University of Arizona, operates the 6.5-m MMT telescope on the summit of Mount Hopkins approximately 45 miles south of Tucson, AZ. The upgraded telescope has been in routine operation for nearly fifteen years and, as such, is a very reliable and productive general purpose astronomical instrument. The telescope can be configured with one of three secondary mirrors that feed more than ten instruments at the Cassegrain focus. In this paper we provide an overview of the the telescope, its current capabilities, and its performance. We will review the existing suite of instruments and their different modes of operation. We will describe some of the general operations challenges and strategies for the Observatory. Finally, we will discuss plans for the near-term future including technical upgrades, new instrumentation and routine queue operation of MMIRS and Binospec.

  20. The Pierre Auger Observatory Upgrade - Preliminary Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aab, Alexander

    The Pierre Auger Observatory has begun a major Upgrade of its already impressive capabilities, with an emphasis on improved mass composition determination using the surface detectors of the Observatory. Known as AugerPrime, the upgrade will include new 4 m 2 plastic scintillator detectors on top of all 1660 water-Cherenkov detectors, updated and more flexible surface detector electronics, a large array of buried muon detectors, and an extended duty cycle for operations of the fluorescence detectors. This Preliminary Design Report was produced by the Collaboration in April 2015 as an internal document and information for funding agencies. It outlines the scientificmore » and technical case for AugerPrime. We now release it to the public via the arXiv server. We invite you to review the large number of fundamental results already achieved by the Observatory and our plans for the future.« less

Top