Wind Shear radar program future plans
NASA Technical Reports Server (NTRS)
Robertson, Roy E.
1991-01-01
The status of the Windshear Radar Program at the Collins Air Transport Division of Rockwell International is given in viewgraph form. Topics covered include goals, modifications to the WXR-700 system, flight test plans, technical approaches, design considerations, system considerations, certification, and future plans.
Pap Testing Stages of Adoption among Cambodian Immigrants
Taylor, Victoria M.; Jackson, J. Carey; Yasui, Yutaka; Schwartz, Stephen M.; Kuniyuki, Alan; Fischer, Meredith; Tu, Shin-Ping
2006-01-01
Purpose We examined levels of Pap testing and factors associated with screening participation among Cambodian refugees. Methods A community-based, in-person survey was conducted in Seattle during late 1997 and early 1998. Interviews were completed by 413 women; the estimated response rate was 73%. We classified respondents into four Pap testing stages of adoption: precontemplation/contemplation (never screened), relapse (ever screened but did not plan to be screened in the future), action (ever screened and planned to be screened in the future), and maintenance (recently screened and planned to be screened in the future). Bivariate and multivariate techniques were used to examine various factors. Findings About one-quarter (24%) of the respondents has never been screened, and a further 22% had been screened but did not plan to obtain Pap tests in the future. Fifteen percent were in the action stage and 39% were in the maintenance stage. The following factors were independently associated with cervical cancer screening stages: previous physician recommendation; younger age; beliefs about Pap testing for post-menopausal women, screening for sexually inactive women, and regular checkups; provider ethnicity; prenatal care in the US; and problems finding interpreters. Conclusions Our findings confirm low Pap testing rates among Cambodian immigrants, and suggest that targeted interventions should be multifaceted. PMID:11567513
The Medical College Admission Test: Past, Present, Future.
ERIC Educational Resources Information Center
Erdmann, James B.; And Others
The evolution of the Medial College Admission Test (MCAT), its present constitution and operation, and plans for its future are discussed. Also included is a current selected bibliography on the test. (AG)
Propulsion Ground Testing: Planning for the Future
NASA Technical Reports Server (NTRS)
Bruce, Robert
2003-01-01
Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre- existing test capabilities. The key words in the previous sentence are "substantial investment". In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based upon both life cycle cost decisions in an environment in which the more immediate challenge of "front-end" capital investment? Often times is the linch-pin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.
Propulsion Ground Testing: Planning for the Future
NASA Technical Reports Server (NTRS)
Bruce, Robert
2003-01-01
Advanced planners are constantly being asked to plan for the provision of future test capability. Historically, this capability is provided either by substantial investment in new test facility capabilities, or in the substantial investment in the modification of pre-exiting test facilities. The key words in the previous sentence are 'substantial investment.' In the evolving environment of increasingly constrained resources, how is an advanced planner to plan for the provisions of such capabilities? Additionally, the conundrum exists that program formulation decisions are being made based on both life cycle cost decisions in an environment in which the more immediate challenge of front-end capital investment oftentimes is the linchpin upon which early decisions are made. In such an environment, how are plans and decisions made? This paper cites examples of decisions made in the past in the area of both major test facility upgrades, as well as major new test facility investment.
Future aerospace ground test facility requirements for the Arnold Engineering Development Center
NASA Technical Reports Server (NTRS)
Kirchner, Mark E.; Baron, Judson R.; Bogdonoff, Seymour M.; Carter, Donald I.; Couch, Lana M.; Fanning, Arthur E.; Heiser, William H.; Koff, Bernard L.; Melnik, Robert E.; Mercer, Stephen C.
1992-01-01
Arnold Engineering Development Center (AEDC) was conceived at the close of World War II, when major new developments in flight technology were presaged by new aerodynamic and propulsion concepts. During the past 40 years, AEDC has played a significant part in the development of many aerospace systems. The original plans were extended through the years by some additional facilities, particularly in the area of propulsion testing. AEDC now has undertaken development of a master plan in an attempt to project requirements and to plan for ground test and computational facilities over the coming 20 to 30 years. This report was prepared in response to an AEDC request that the National Research Council (NRC) assemble a committee to prepare guidance for planning and modernizing AEDC facilities for the development and testing of future classes of aerospace systems as envisaged by the U.S. Air Force.
ERIC Educational Resources Information Center
Gresham, Frank M.; Witt, Joseph C.
1997-01-01
Maintains that intelligence tests contribute little to the planning, implementation, and evaluation of instructional interventions for children. Suggests that intelligence tests are not useful in making differential diagnostic and classification determinations for children with mild learning problems and that such testing is not a cost-beneficial…
Future states: the axioms underlying prospective, future-oriented, health planning instruments.
Koch, T
2001-02-01
Proscriptive planning exercises are critical to and generally accepted as integral to health planning at varying scales. These require specific instruments designed to predict future actions on the basis of present knowledge. At the macro-level of health economics, for example, a number of future-oriented Quality of Life Instruments (QL) are commonly employed. At the level of individual decision making, on the other hand, Advance Directives (AD's) are advanced as a means by which healthy individuals can assure their wishes will be carried out if at some future point they are incapacitated. As proscriptive tools, both instrument classes appear to share an axiomatic set whose individual parts have not been rigorously considered. This paper attempts to first identify and then consider a set of five axioms underlying future oriented health planning instruments. These axioms are then critiqued using data from a pre-test survey designed specifically to address their assumptions. Results appear to challenge the validity of the axioms underlying the proscriptive planning instruments.
Facing the future: Memory as an evolved system for planning future acts
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.
2013-01-01
All organisms capable of long-term memory are necessarily oriented toward the future. We propose that one of the most important adaptive functions of long-term episodic memory is to store information about the past in the service of planning for the personal future. Because a system should have especially efficient performance when engaged in a task that makes maximal use of its evolved machinery, we predicted that future-oriented planning would result in especially good memory relative to other memory tasks. We tested recall performance of a word list, using encoding tasks with different temporal perspectives (e.g., past, future) but a similar context. Consistent with our hypothesis, future-oriented encoding produced superior recall. We discuss these findings in light of their implications for the thesis that memory evolved to enable its possessor to anticipate and respond to future contingencies that cannot be known with certainty. PMID:19966234
Nuclear Weapons: Comprehensive Test Ban Treaty
2007-04-04
indicated plans to reduce the time between a decision to conduct a nuclear test and the test itself, which has been done. Critics raised concerns...testing in the future, but there are no plans to do so.’”6 Critics expressed concern about the implications of these policies for testing and new... critic felt that increased funding for test readiness would in effect give prior approval for testing. CRS-4 8 The National Academies, “Academy
Advertising family planning in the press: direct response results from Bangladesh.
Harvey, P D
1984-01-01
In 1977 and again in 1982, a series of couponed ads were run in three major Bangladeshi newspapers to test the relative effectiveness of different family planning themes. The ads offered a free booklet about methods of family planning (1977) or "detailed information on contraceptives" (1982) in the context of family health, the wife's happiness, the children's future, and family economics. The most effective ads, by a highly significant margin, were those stressing the importance of family economics (food and shelter) and the children's (sons') future. The least effective ads stressed the benefits of family planning for the wife.
Efficient concepts for large erectable space structures
NASA Technical Reports Server (NTRS)
Card, M. F.; Bush, H. G.; Heard, W. L., Jr.; Mikulas, M. M., Jr.
1978-01-01
The status of Langley Research Center development of the nestable column concept is reviewed including results of member and truss component tests, and planned assembly studies. In addition, more recent studies of alternative member concepts are presented. Preliminary results on relative efficiency of several types of truss-type columns are compared and future test plans discussed.
On My Mind: Pay It Forward with Professional Development, Not High-Stakes Testing.
ERIC Educational Resources Information Center
Warlick, David
2001-01-01
Suggests that professional planning, not high-stakes testing, "an Industrial Age solution to an Information Age problem," is the key to education's future. Proposes that the day for school library media specialists and teachers should be equally divided between teaching and professional planning-four hours of instructional supervision and four…
Michelle L. Johnson; Kathleen P. Bell; Mario F. Teisl
2016-01-01
Scenarios of future outcomes often provide context for policy decisions and can be a form of science communication, translating complex and uncertain relationships into stories for a broader audience. We conducted a survey experiment (n = 270) to test the effects of reading land use change scenarios on willingness to participate in land use planning activities. In the...
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2008-05-28
testing, and has no plans to test. It has reduced the time needed to conduct a nuclear test. Critics raised concerns about the implications of these...particularly as it is reduced, is reliable and safe. So he has not ruled out testing in the future, but there are no plans to do so.’”4 Critics ...Secretary of State, to Honorable Pete Domenici, United States Senate, June 25, 2007. a ten-year-old moratorium on nuclear weapons testing.”5 Another critic
Kerry, Matthew J; Embretson, Susan E
2017-01-01
Future time perspective (FTP) is defined as "perceptions of the future as being limited or open-ended" (Lang and Carstensen, 2002; p. 125). The construct figures prominently in both workplace and retirement domains, but the age-predictions are competing: Workplace research predicts decreasing FTP age-change, in contrast, retirement scholars predict increasing FTP age-change. For the first time, these competing predictions are pitted in an experimental manipulation of subjective life expectancy (SLE). A sample of N = 207 older adults (age 45-60) working full-time (>30-h/week) were randomly assigned to SLE questions framed as either 'Live-to' or 'Die-by' to evaluate competing predictions for FTP. Results indicate general support for decreasing age-change in FTP, indicated by independent-sample t -tests showing lower FTP in the 'Die-by' framing condition. Further general-linear model analyses were conducted to test for interaction effects of retirement planning with experimental framings on FTP and intended retirement; While retirement planning buffered FTP's decrease, simple-effects also revealed that retirement planning increased intentions for sooner retirement, but lack of planning increased intentions for later retirement. Discussion centers on practical implications of our findings and consequences validity evidence in future empirical research of FTP in both workplace and retirement domains.
Veggie and the VEG-01 Hardware Validation Test
NASA Technical Reports Server (NTRS)
Massa, Gioia; wheeler, Ray; Smith, Trent
2015-01-01
This presentation presents a brief overview of KSC plant science hardware for space and then details the Veggie hardware and the VEG-01 hardware validation test. The test results and future plans are discussed.
Sheffrin, Meera; Stijacic Cenzer, Irena; Steinman, Michael A
2016-12-13
It is unknown whether older adults in the United States would be willing to take a test predictive of future Alzheimer's disease, or whether testing would change behavior. Using a nationally representative sample, we explored who would take a free and definitive test predictive of Alzheimer's disease, and examined how using such a test may impact advance care planning. A cross-sectional study within the 2012 Health and Retirement Study of adults aged 65 years or older asked questions about a test predictive of Alzheimer's disease (N = 874). Subjects were asked whether they would want to take a hypothetical free and definitive test predictive of future Alzheimer's disease. Then, imagining they knew they would develop Alzheimer's disease, subjects rated the chance of completing advance care planning activities from 0 to 100. We classified a score > 50 as being likely to complete that activity. We evaluated characteristics associated with willingness to take a test for Alzheimer's disease, and how such a test would impact completing an advance directive and discussing health plans with loved ones. Overall, 75% (N = 648) of the sample would take a free and definitive test predictive of Alzheimer's disease. Older adults willing to take the test had similar race and educational levels to those who would not, but were more likely to be ≤75 years old (odds ratio 0.71 (95% CI 0.53-0.94)). Imagining they knew they would develop Alzheimer's, 81% would be likely to complete an advance directive, although only 15% had done so already. In this nationally representative sample, 75% of older adults would take a free and definitive test predictive of Alzheimer's disease. Many participants expressed intent to increase activities of advance care planning with this knowledge. This confirms high public interest in predictive testing for Alzheimer's disease and suggests this may be an opportunity to engage patients in advance care planning discussions.
Roadless area-intensive management tradeoffs on the Sierra National Forest, California
Robert J. Hrubes; Kent P. Connaughton; Robert W. Sassaman
1979-01-01
This hypothesis was tested by a linear programing model: Roadless areas on the Sierra National Forest precluded from planned future development would be candidates for wilderness designation, and the associated loss in present and future timber harvests could be offset by investing in more intensive management. The results of this simulation test suggest that levels of...
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2009-01-28
safe. So he has not ruled out testing in the future, but there are no plans to do so.’”5 Critics expressed concern about the implications of these...nuclear weapons testing.”6 Another critic felt that increased funding for test readiness would in effect give prior approval for testing. In July 2002 a...moratorium. We may find at some future time that we cannot diagnose or remedy a problem in a warhead critical the U.S. nuclear deterrent without
Avionics test bed development plan
NASA Technical Reports Server (NTRS)
Harris, L. H.; Parks, J. M.; Murdock, C. R.
1981-01-01
A development plan for a proposed avionics test bed facility for the early investigation and evaluation of new concepts for the control of large space structures, orbiter attached flex body experiments, and orbiter enhancements is presented. A distributed data processing facility that utilizes the current laboratory resources for the test bed development is outlined. Future studies required for implementation, the management system for project control, and the baseline system configuration are defined. A background analysis of the specific hardware system for the preliminary baseline avionics test bed system is included.
NASA Technical Reports Server (NTRS)
Ray, Charles D.; Carrasquillo, Robyn L.; Minton-Summers, Silvia
1997-01-01
This paper provides a summary of current work accomplished under technical task agreement (TTA) by the Marshall Space Flight Center (MSFC) regarding the Environmental Control and Life Support System (ECLSS) as well as future planning activities in support of the International Space Station (ISS). Current activities include ECLSS computer model development, component design and development, subsystem integrated system testing, life testing, and government furnished equipment delivered to the ISS program. A long range plan for the MSFC ECLSS test facility is described whereby the current facility would be upgraded to support integrated station ECLSS operations. ECLSS technology development efforts proposed to be performed under the Advanced Engineering Technology Development (AETD) program are also discussed.
The application test system: Experiences to date and future plans
NASA Technical Reports Server (NTRS)
May, G. A.; Ashburn, P.; Hansen, H. L. (Principal Investigator)
1979-01-01
The ATS analysis component is presented focusing on methods by which the varied data sources are used by the ATS analyst. Analyst training and initial processing of data is discussed along with short and long plans for the ATS.
Graphics Processor Units (GPUs)
NASA Technical Reports Server (NTRS)
Wyrwas, Edward J.
2017-01-01
This presentation will include information about Graphics Processor Units (GPUs) technology, NASA Electronic Parts and Packaging (NEPP) tasks, The test setup, test parameter considerations, lessons learned, collaborations, a roadmap, NEPP partners, results to date, and future plans.
Kerry, Matthew J.; Embretson, Susan E.
2018-01-01
Future time perspective (FTP) is defined as “perceptions of the future as being limited or open-ended” (Lang and Carstensen, 2002; p. 125). The construct figures prominently in both workplace and retirement domains, but the age-predictions are competing: Workplace research predicts decreasing FTP age-change, in contrast, retirement scholars predict increasing FTP age-change. For the first time, these competing predictions are pitted in an experimental manipulation of subjective life expectancy (SLE). A sample of N = 207 older adults (age 45–60) working full-time (>30-h/week) were randomly assigned to SLE questions framed as either ‘Live-to’ or ‘Die-by’ to evaluate competing predictions for FTP. Results indicate general support for decreasing age-change in FTP, indicated by independent-sample t-tests showing lower FTP in the ‘Die-by’ framing condition. Further general-linear model analyses were conducted to test for interaction effects of retirement planning with experimental framings on FTP and intended retirement; While retirement planning buffered FTP’s decrease, simple-effects also revealed that retirement planning increased intentions for sooner retirement, but lack of planning increased intentions for later retirement. Discussion centers on practical implications of our findings and consequences validity evidence in future empirical research of FTP in both workplace and retirement domains. PMID:29375435
A survey of experiments and experimental facilities for active control of flexible structures
NASA Technical Reports Server (NTRS)
Sparks, Dean W., Jr.; Horner, Garnett C.; Juang, Jer-Nan; Klose, Gerhard
1989-01-01
A brief survey of large space structure control related experiments and facilities was presented. This survey covered experiments performed before and up to 1982, and those of the present period (1982-...). Finally, the future planned experiments and facilities in support of the control-structure interaction (CSI) program were reported. It was stated that new, improved ground test facilities are needed to verify the new CSI design techniques that will allow future space structures to perform planned NASA missions.
Future thinking improves prospective memory performance and plan enactment in older adults.
Altgassen, Mareike; Rendell, Peter G; Bernhard, Anka; Henry, Julie D; Bailey, Phoebe E; Phillips, Louise H; Kliegel, Matthias
2015-01-01
Efficient intention formation might improve prospective memory by reducing the need for resource-demanding strategic processes during the delayed performance interval. The present study set out to test this assumption and provides the first empirical assessment of whether imagining a future action improves prospective memory performance equivalently at different stages of the adult lifespan. Thus, younger (n = 40) and older (n = 40) adults were asked to complete the Dresden Breakfast Task, which required them to prepare breakfast in accordance with a set of rules and time restrictions. All participants began by generating a plan for later enactment; however, after making this plan, half of the participants were required to imagine themselves completing the task in the future (future thinking condition), while the other half received standard instructions (control condition). As expected, overall younger adults outperformed older adults. Moreover, both older and younger adults benefited equally from future thinking instructions, as reflected in a higher proportion of prospective memory responses and more accurate plan execution. Thus, for both younger and older adults, imagining the specific visual-spatial context in which an intention will later be executed may serve as an easy-to-implement strategy that enhances prospective memory function in everyday life.
A study on the utilization of advanced composites in commercial aircraft wing structure
NASA Technical Reports Server (NTRS)
Watts, D. J.
1978-01-01
A study was conducted to define the technology and data needed to support the introduction of advanced composite materials in the wing structure of future production aircraft. The study accomplished the following: (1) definition of acceptance factors, (2) identification of technology issues, (3) evaluation of six candidate wing structures, (4) evaluation of five program options, (5) definition of a composite wing technology development plan, (6) identification of full-scale tests, (7) estimation of program costs for the total development plan, (8) forecast of future utilization of composites in commercial transport aircraft and (9) identification of critical technologies for timely program planning.
NASA Astrophysics Data System (ADS)
Reed, D.
2017-12-01
The Louisiana coast has suffered severe land loss in recent decades as human activities have exacerbated the effects of natural stressors leading to catastrophic land loss and increased flood threats to coastal communities. Planning for the future requires a recognition of climate change but also leads to the challenge of understanding how different plausible future conditions influence the outcomes of restoration and protection actions. In coastal Louisiana, the $50 billion Coastal master Plan is legislatively required to be revisited every 5 years in order to ensure that plans for the future continue to be based on the best available, but constantly evolving, scientific information. For the 2017 iteration of the Coastal Master Plan, identification of the environmental scenarios to be explored began in 2014 and included both professional judgment regarding the most important drivers of future change, as well as climate change information derived during the National Climate Assessment. The number of scenarios to be explored was limited by both available resources and the need to make the findings accessible to stakeholders and policy makers. Plausible ranges were identified for key drivers of coastal landscape change, including climatic factors such as eustatic sea-level, precipitation and evapotranspiration. Sensitivity analysis was conducted to explore how the coastal landscape changed in response to combinations of values, allowed agency personnel to select three scenarios against which to test the effectiveness of different restoration and protection actions. The 2017 Coastal Master Plan was then developed by exploring the response of different actions to the scenarios, and how project costs also varied depending on future conditions. Such consideration of climate change in coastal planning at the state scale is facilitated by the availability of scientifically valid information on climate change, that has already been reviewed and sourced.
Most nanomaterials (NMs) in commerce lack hazard data. Efficient NM testing requires suitable toxicity tests for prioritization of NMs to be tested. The EPA’s ToxCast program is screening NM bioactivities and ranking NMs by their bioactivities to inform targeted testing planning....
Experimental uncertainty survey and assessment. [Space Shuttle Main Engine testing
NASA Technical Reports Server (NTRS)
Coleman, Hugh W.
1992-01-01
An uncertainty analysis and assessment of the specific impulse determination during Space Shuttle Main Engine testing is reported. It is concluded that in planning and designing tests and in interpreting the results of tests, the bias and precision components of experimental uncertainty should be considered separately. Recommendations for future research efforts are presented.
NASA Technical Reports Server (NTRS)
Mullette, Mark; Matthews, Gary; Russell, Kevin (Technical Monitor)
2002-01-01
The actuator technology required for AMSD and subsequently NGST are critical in the successful development for future cryogenic systems. Kodak has undertaken an extensive test plan to determine the performance of the force actuators developed under the AMSD program. These actuators are currently in testing at MSFC and are expected to finish this test cycle in early June 2002.
Innovative Test Operations to Support Orion and Future Human Rated Missions
NASA Technical Reports Server (NTRS)
Koenig, William J.; Garcia, Rafael; Harris, Richard F.; See, Michael J.; Van Lear, Benjamin S.; Dobson, Jill M.; Norris, Scott Douglas
2017-01-01
This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.
Laser diode arrays for naval reconnaissance
NASA Astrophysics Data System (ADS)
Holloway, John H., Jr.; Crosby, Frank J.; Petee, Danny A.; Suiter, Harold R.; Witherspoon, Ned H.
2003-09-01
The Airborne Littoral Reconnaissance Technologies (ALRT) Project has demonstrated a nighttime operational minefield detection capability using commercial off-the-shelf high-power Laser Diode Arrays (LDAs). Historically, optical aerial detection of minefields has primarily been limited to daytime operations but LDAs promise compact and efficient lighting to allow for enhanced reconnaissance operations for future mine detection systems. When combined with high-resolution intensified imaging systems, LDAs can illuminate otherwise unseen areas. Future wavelength options will open the way for active multispectral imaging with LDAs. The Coastal Systems Station working for the Office of Naval Research on the ALRT project has designed, developed, integrated, and tested both prototype and commercial arrays from a Cessna airborne platform. Detailed test results show the ability to detect several targets of interest in a variety of background conditions. Initial testing of the prototype arrays, reported on last year, was completed and further investigations of the commercial versions were performed. Polarization-state detection studies were performed, and advantageous properties of the source-target-sensor geometry noted. Current project plans are to expand the field-of-view coverage for Naval exercises in the summer of 2003. This paper describes the test collection, data library products, array information, on-going test analysis results, and future planned testing of the LDAs.
Flight Flutter Testing of Supersonic Interceptors
NASA Technical Reports Server (NTRS)
Dublin, M.; Peller, R.
1975-01-01
A summary is presented of experiences in connection with flight flutter testing of supersonic interceptors. The planning and operational aspects involved are described along with the difficulties encountered, and the correlation between measurement and theory. Recommendations for future research and development to advance the science of flight flutter testing are included.
A Peer Counselling Program for Persons Testing H.I.V. Antibody Positive.
ERIC Educational Resources Information Center
Baiss, Alan
1989-01-01
Describes need for and development of a peer counseling program for persons who have tested positive for human immunodeficiency virus (HIV) antibodies. Discusses selection of peer counselors, training, and confidentiality. Includes discussion of future plans. (ABL)
Space exploration initiative candidate nuclear propulsion test facilities
NASA Technical Reports Server (NTRS)
Baldwin, Darrell; Clark, John S.
1993-01-01
One-page descriptions for approximately 200 existing government, university, and industry facilities which may be available in the future to support SEI nuclear propulsion technology development and test program requirements are provided. To facilitate use of the information, the candidate facilities are listed both by location (Index L) and by Facility Type (Index FT). The included one-page descriptions provide a brief narrative description of facility capability, suggest potential uses for each facility, and designate a point of contact for additional information that may be needed in the future. The Nuclear Propulsion Office at NASA Lewis presently plans to maintain, expand, and update this information periodically for use by NASA, DOE, and DOD personnel involved in planning various phases of the SEI Nuclear Propulsion Project.
2009-12-01
or decision unless so designated by other documentation. REPORT DOCUMENTATION PAGE Form Approved OMB No. 0704-0188 Public reporting burden...efficiencies of efferocytosis. In future studies stimulated by this grant, we plan to study mouse models of PPAR activation and depletion to test our...eNampt levels when diet-induced obese mice are switched to a low-calorie diet. Stimulated by these findings, we plan to test causation by restoring
NASA Technical Reports Server (NTRS)
Hodgson, Edward; Oehler, William; Dionne, Steve; Converse, David; Jennings, Mallory A.
2012-01-01
NASA s plans for Extravehicular Activity (EVA) portable life support systems for future exploration missions result in different design requirements than those which led to the combined fan / pump / separator in the current ISS Extravehicular Mobility Unit (EMU). To meet these new requirements, NASA contracted with Hamilton Sundstrand to provide two new prototype fans designed to meet anticipated future system requirements. Based on design trade studies, a high speed fan with mechanical bearing support of the rotating elements and a novel non-metallic barrier canned motor design was developed and implemented in the deliverable prototypes. The prototypes, which used two different bearing lubricants, have been extensively tested in both stand-alone and integrated system tests in NASA laboratories and proven to meet the anticipated performance requirements. Subsequently, they have been subjected to post test inspection and analysis in Hamilton Sundstrand laboratories to assess the effects of integrated operation and resultant exposure to vent loop contaminants. Results have confirmed expectations that one of the lubricants would be superior in this application and the prototype fans have been reassembled with new bearings with the superior lubricant. They have now been returned to the Johnson Space Center for further testing and maturation as part of NASA s PLSS 2.0 integrated test effort. This paper will discuss the test history of these units, resulting test data, the results of post test evaluation, and plans for further testing in the near future.
Environmental assessment of spatial plan policies through land use scenarios
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geneletti, Davide, E-mail: davide.geneletti@ing.unitn.it
2012-01-15
This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of howmore » the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.« less
High Burnup Dry Storage Cask Research and Development Project, Final Test Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-02-27
EPRI is leading a project team to develop and implement the first five years of a Test Plan to collect data from a SNF dry storage system containing high burnup fuel.12 The Test Plan defined in this document outlines the data to be collected, and the storage system design, procedures, and licensing necessary to implement the Test Plan.13 The main goals of the proposed test are to provide confirmatory data14 for models, future SNF dry storage cask design, and to support license renewals and new licenses for ISFSIs. To provide data that is most relevant to high burnup fuel inmore » dry storage, the design of the test storage system must mimic real conditions that high burnup SNF experiences during all stages of dry storage: loading, cask drying, inert gas backfilling, and transfer to the ISFSI for multi-year storage.15 Along with other optional modeling, SETs, and SSTs, the data collected in this Test Plan can be used to evaluate the integrity of dry storage systems and the high burnup fuel contained therein over many decades. It should be noted that the Test Plan described in this document discusses essential activities that go beyond the first five years of Test Plan implementation.16 The first five years of the Test Plan include activities up through loading the cask, initiating the data collection, and beginning the long-term storage period at the ISFSI. The Test Plan encompasses the overall project that includes activities that may not be completed until 15 or more years from now, including continued data collection, shipment of the Research Project Cask to a Fuel Examination Facility, opening the cask at the Fuel Examination Facility, and examining the high burnup fuel after the initial storage period.« less
Integrated Planning for Telepresence with Time Delays
NASA Technical Reports Server (NTRS)
Johnston, Mark D.; Rabe, Kenneth J.
2006-01-01
Integrated planning and execution of teleoperations in space with time delays is shown. The topics include: 1) The Problem; 2) Future Robot Surgery? 3) Approach Overview; 4) Robonaut; 5) Normal Planning and Execution; 6) Planner Context; 7) Implementation; 8) Use of JSHOP2; 9) Monitoring and Testing GUI; 10) Normal sequence: first the supervisor acts; 11) then the robot; 12) Robot might be late; 13) Supervisor can work ahead; 14) Deviations from Plan; 15) Robot State Change Example; 16) Accomplished goals skipped in replan; 17) Planning continuity; 18) Supervisor Deviation From Plan; 19) Intentional Deviation; and 20) Infeasible states.
Cordonnier, Aline; Barnier, Amanda J; Sutton, John
2016-01-01
Research on future thinking has emphasized how episodic details from memories are combined to create future thoughts, but has not yet examined the role of semantic scripts. In this study, participants recalled how they planned a past camping trip in Australia (past planning task) and imagined how they would plan a future camping trip (future planning task), set either in a familiar (Australia) or an unfamiliar (Antarctica) context. Transcripts were segmented into information units that were coded according to semantic category (e.g., where, when, transport, material, actions). Results revealed a strong interaction between tasks and their presentation order. Starting with the past planning task constrained the future planning task when the context was familiar. Participants generated no new information when the future camping trip was set in Australia and completed second (after the past planning task). Conversely, starting with the future planning task facilitated the past planning task. Participants recalled more information units of their past plan when the past planning task was completed second (after the future planning task). These results shed new light on the role of scripts in past and future thinking and on how past and future thinking processes interact.
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2010-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, and it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flowfield properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of 2 were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
Flight Test Results from the Rake Airflow Gage Experiment on the F-15B Airplane
NASA Technical Reports Server (NTRS)
Frederick, Michael A.; Ratnayake, Nalin A.
2011-01-01
The Rake Airflow Gage Experiment involves a flow-field survey rake that was flown on the Propulsion Flight Test Fixture at the NASA Dryden Flight Research Center using the Dryden F-15B research test bed airplane. The objective of this flight test was to ascertain the flow-field angularity, local Mach number profile, total pressure distortion, and dynamic pressure at the aerodynamic interface plane of the Channeled Centerbody Inlet Experiment. This new mixed-compression, supersonic inlet is planned for flight test in the near term. Knowledge of the flow-field characteristics at this location underneath the airplane is essential to flight test planning and computational modeling of the new inlet, an< it is also applicable for future propulsion systems research that may use the Propulsion Flight Test Fixture. This report describes the flight test preparation and execution, and the local flow-field properties calculated from pressure measurements of the rake. Data from the two Rake Airflow Gage Experiment research flights demonstrate that the F-15B airplane, flying at a free-stream Mach number of 1.65 and a pressure altitude of 40,000 ft, would achieve the desired local Mach number for the future inlet flight test. Interface plane distortion levels of 2 percent and a local angle of attack of -2 deg were observed at this condition. Alternative flight conditions for future testing and an exploration of certain anomalous data also are provided.
Developing a Campaign Plan to Target Centers of Gravity Within Economic Systems
1995-05-01
Conclusion 67 CHAPTER 7: CURRENT AND FUTURE CONCERNS 69 Decision Making and Planning 69 Conclusion 72 CHAPTER 8: CONCLUSION 73 APPENDIX A: STATISTICS 80...Terminology and Statistical Tests 80 Country Analysis 84 APPENDIX B 154 BIBLIOGRAPHY 157 VITAE 162 IV LIST OF FIGURES Figure 1. Air Campaign...This project furthers the original statistical effort and adds to this a campaign planning approach (including both systems and operational level
ADEPT - A Mechanically Deployable Entry System Technology in Development at NASA
NASA Technical Reports Server (NTRS)
Venkatapathy, Ethiraj; Wercinski, Paul; Cassell, Alan; Smith, Brandon; Yount, Bryan
2016-01-01
The proposed presentation will give an overview of a mechanically deployable entry system concept development with a comprehensive summary of the ground tests and design development completed to-date, and current plans for a small-scale flight test in the near future.
Epstein, Leonard H; Jankowiak, Noelle; Lin, Henry; Paluch, Rocco; Koffarnus, Mikhail N; Bickel, Warren K
2014-09-01
Low income is related to food insecurity, and research has suggested that a scarcity of resources associated with low income can shift attention to the present, thereby discounting the future. We tested whether attending to the present and discounting the future may moderate the influence of income on food insecurity. Delay discounting and measures of future time perspective (Zimbardo Time Perspective Inventory, Consideration of Future Consequences Scale, time period of financial planning, and subjective probability of living to age 75 y) were studied as moderators of the relation between income and food insecurity in a diverse sample of 975 adults, 31.8% of whom experienced some degree of food insecurity. Income, financial planning, subjective probability of living to age 75 y, and delay discounting predicted food insecurity as well as individuals who were high in food insecurity. Three-way interactions showed that delay discounting interacted with financial planning and income to predict food insecurity (P = 0.003). At lower levels of income, food insecurity was lowest for subjects who had good financial planning skills and did not discount the future, whereas having good financial skills and discounting the future had minimal influence on food insecurity. The same 3-way interaction was observed when high food insecurity was predicted (P = 0.008). Because of the role of scarce resources on narrowing attention and reducing prospective thinking, research should address whether modifying future orientation may reduce food insecurity even in the face of diminishing financial resources. © 2014 American Society for Nutrition.
MTRETR MAINTENANCE SHOP, TRA653. FLOOR PLAN FOR FIRST FLOOR: MACHINE ...
MTR-ETR MAINTENANCE SHOP, TRA-653. FLOOR PLAN FOR FIRST FLOOR: MACHINE SHOP, ELECTRICAL AND INSTRUMENT SHOP, TOOL CRIB, ELECTRONIC SHOP, LOCKER ROOM, SPECIAL TEMPERATURE CONTROLLED ROOM, AND OFFICES. "NEW" ON DRAWING REFERS TO REVISION OF 11/1956 DRAWING ON WHICH AREAS WERE DESIGNATED AS "FUTURE." HUMMEL HUMMEL & JONES 810-MTR-ETR-653-A-7, 5/1957. INL INDEX NO. 532-0653-00-381-101839, REV. 2. - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID
Motivation towards Medical Career Choice and Future Career Plans of Polish Medical Students
ERIC Educational Resources Information Center
Gasiorowski, Jakub; Rudowicz, Elzbieta; Safranow, Krzysztof
2015-01-01
This longitudinal study aimed at investigating Polish medical students' career choice motivation, factors influencing specialty choices, professional plans and expectations. The same cohort of students responded to the same questionnaire, at the end of Year 1 and Year 6. The Chi-square, Mann-Whitney U tests and logistic regression were used in…
A strategic informatics approach to autoverification.
Jones, Jay B
2013-03-01
Autoverification is rapidly expanding with increased functionality provided by middleware tools. It is imperative that autoverification of laboratory test results be viewed as a process evolving into a broader, more sophisticated form of decision support, which will require strategic planning to form a foundational tool set for the laboratory. One must strategically plan to expand autoverification in the future to include a vision of instrument-generated order interfaces, reflexive testing, and interoperability with other information systems. It is hoped that the observations, examples, and opinions expressed in this article will stimulate such short-term and long-term strategic planning. Copyright © 2013 Elsevier Inc. All rights reserved.
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2013-01-02
41 The National Academy of Sciences Study and Its Critics ...reliable and safe. So he has not ruled out testing in the future, but there are no plans to do so.”6 Critics expressed concern about the...nuclear weapons testing.”7 Another critic felt that increased funding for test readiness would in effect give prior approval for testing. In July 2002 a
Environmental control and life support testing at the Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Schunk, Richard G.; Humphries, William R.
1987-01-01
The Space Station Environmental Control and Life Support System (ECLSS) test program at the Marshall Space Flight Center (MSFC) is addressed. The immediate goals and current activities of the test program are discussed. Also described are the Core Module Integration Facility (CMIF) and the initial ECLSS test configuration. Future plans for the ECLSS test program and the CMIF are summarized.
EBMUD Drought Planning Put to the Test in 2014
NASA Astrophysics Data System (ADS)
Bray, B. S.
2014-12-01
The East Bay Municipal Utility District faced challenges in the unprecedented 2014 drought managing limited supplies to reliably serve its customers. The District's successful drought planning required a multi-faceted plan to preserve a reliable water supply, now and into the future. Planning has included investments in recycled water projects, passive and active customer conservation programs, and pursuit of alternative water supply options. EBMUD's drought planning efforts have been tested in 2014 when California experienced one of the driest years on record and the 2nd driest year in the Mokelumne Watershed, the source of 90% of the District's water supply. This presentation will highlight the effectiveness of drought planning in three areas: (1) implementing 10% water conservation as of July 2014, (2) the securing of nearly 20TAF of supplemental water supply conveyed through the Freeport Regional Water Project, and (3) operating EBMUD's Mokelumne River Project to meet fishery flow and water quality objectives.
Between-District Test Score Variation, 2009-2012
ERIC Educational Resources Information Center
Fahle, Erin; Reardon, Sean
2016-01-01
Describing the variation in test scores between and within school districts is critical for: (1) for policy-related and descriptive work that investigates the sorting of students among districts and the differential effectiveness of those districts; and (2) for methodological work planning future experiments or interventions. Intraclass…
Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles
NASA Technical Reports Server (NTRS)
Cockrell, Charles E.; Taylor, James L.; Patterson, Alan; Stephens, Samuel E.; Tuma, Margaret; Bartolotta, Paul; Huetter, Uwe; Kaderback, Don; Goggin, David
2009-01-01
The U.S. National Aeronautics and Space Administration (NASA) initiated plans to develop the Ares I and Ares V launch vehicles in 2005 to meet the mission objectives for future human exploration of space. Ares I is designed to provide the capability to deliver the Orion crew exploration vehicle (CEV) to low-Earth orbit (LEO), either for docking to the International Space Station (ISS) or docking with an Earth departure stage (EDS) and lunar lander for transit to the Moon. Ares V provides the heavy-lift capability to deliver the EDS and lunar lander to orbit. An integrated test plan was developed for Ares I that includes un-crewed flight validation testing and ground testing to qualify structural components and propulsion systems prior to operational deployment. The overall test program also includes a single development test flight conducted prior to the Ares I critical design review (CDR). Since the Ares V concept was formulated to maximize hardware commonality between the Ares V and Ares I launch vehicles, initial test planning for Ares V has considered the extensibility of test approaches and facilities from Ares I. The Ares V test plan was part of a successful mission concept review (MCR) in 2008.
1974-08-01
contributed substantially to the planning of the flight course used in this study and in the preparation of this report. Assistance in business matters has...CONTENTS Page INTRODUCTION 1 METHOD 5 Subjects 5 Equipment Experimental Plan 8 Procedure 14 Performance Assessment 17 Statistical Treatment 19 RESULTS...implementation of RNAV service. These documents provide the basis for future RNAV planning both procedurally and quantitatively. At the heart of the
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-19
... (FEIS), including the following proposed land use changes: expansion of the Main Post and alterations in..., and increase in the level of test activities; development of six new Specialized Areas (four for test... Strategy Plan and siting process for facilitating future tests and training activities at WSMR; and...
Development of a verification program for deployable truss advanced technology
NASA Technical Reports Server (NTRS)
Dyer, Jack E.
1988-01-01
Use of large deployable space structures to satisfy the growth demands of space systems is contingent upon reducing the associated risks that pervade many related technical disciplines. The overall objectives of this program was to develop a detailed plan to verify deployable truss advanced technology applicable to future large space structures and to develop a preliminary design of a deployable truss reflector/beam structure for use a a technology demonstration test article. The planning is based on a Shuttle flight experiment program using deployable 5 and 15 meter aperture tetrahedral truss reflections and a 20 m long deployable truss beam structure. The plan addresses validation of analytical methods, the degree to which ground testing adequately simulates flight and in-space testing requirements for large precision antenna designs. Based on an assessment of future NASA and DOD space system requirements, the program was developed to verify four critical technology areas: deployment, shape accuracy and control, pointing and alignment, and articulation and maneuvers. The flight experiment technology verification objectives can be met using two shuttle flights with the total experiment integrated on a single Shuttle Test Experiment Platform (STEP) and a Mission Peculiar Experiment Support Structure (MPESS). First flight of the experiment can be achieved 60 months after go-ahead with a total program duration of 90 months.
Development of Shanghai satellite laser ranging station
NASA Technical Reports Server (NTRS)
Yang, Fu-Min; Tan, De-Tong; Xiao, Chi-Kun; Chen, Wan-Zhen; Zhang, J.-H.; Zhang, Z.-P.; Lu, Wen-Hu; Hu, Z.-Q.; Tang, W.-F.; Chen, J.-P.
1993-01-01
The topics covered include the following: improvement of the system hardware; upgrading of the software; the observation status; preliminary daylight tracking capability; testing the new type of laser; and future plans.
The Future of Toxicity Testing - the NRC Vision and EPA’s ToxCast Program
The EPA requested the National Research Council (NRC) to develop a vision and strategic plan for toxicity testing in the 21st century. The 2007 report called for transforming toxicology to provide a robust scientific basis for assessing adverse health effects of environmental age...
12 CFR 1238.4 - Methodologies and practices.
Code of Federal Regulations, 2014 CFR
2014-01-01
... conducting a stress test under § 1238.3, each regulated entity shall calculate how each of the following is affected during each quarter of the stress test planning horizon, for each scenario: (1) Potential losses, pre-provision net revenues, allowance for loan losses, and future pro forma capital positions over the...
CMIF ECLS system test findings
NASA Technical Reports Server (NTRS)
Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.
1989-01-01
During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.
ERIC Educational Resources Information Center
Onosko, Joe
2011-01-01
President Barack Obama's Race to the Top (RTT) is a profoundly flawed educational reform plan that increases standardization, centralization, and test-based accountability in our nation's schools. Following a brief summary of the interest groups supporting the plan, who is currently participating in this race, why so many states voluntarily…
Eriksson, J; Ek, A; Johansson, G
2000-03-01
A software prototype to support the planning process for adapting home and work environments for people with physical disabilities was designed and later evaluated. The prototype exploits low-cost three-dimensional (3-D) graphics products in the home computer market. The essential features of the prototype are: interactive rendering with optional hardware acceleration, interactive walk-throughs, direct manipulation tools for moving objects and measuring distances, and import of 3-D-objects from a library. A usability study was conducted, consisting of two test sessions (three weeks apart) and a final interview. The prototype was then tested and evaluated by representatives of future users: five occupational therapist students, and four persons with physical disability, with no previous experience of the prototype. Emphasis in the usability study was placed on the prototype's efficiency and learnability. We found that it is possible to realise a planning tool for environmental adaptations, both regarding usability and technical efficiency. The usability evaluation confirms our findings from previous case studies, regarding the relevance and positive attitude towards this kind of planning tool. Although the prototype was found to be satisfactorily efficient for the basic tasks, the paper presents several suggestions for improvement of future prototype versions.
Summary of Recent Inducer Testing at MSFC and Future Plans
NASA Technical Reports Server (NTRS)
Skelley, Stephen
2003-01-01
This viewgraph presentation covers water flow tests on the RS-83 Main LOX Inducer for the Space Shuttle Main Engine (SSME). The presentation lists recent water tests on the SSME liquid oxygen (LOX) pump inducer, includes images and diagrams of the water test facility at Marshall Space Flight Center (MSFC), profiles inducer hydrodynamic forces, and diagrams the performance of the RS-83 inducer.
Epstein, Leonard H; Jankowiak, Noelle; Lin, Henry; Paluch, Rocco; Koffarnus, Mikhail N; Bickel, Warren K
2014-01-01
Background: Low income is related to food insecurity, and research has suggested that a scarcity of resources associated with low income can shift attention to the present, thereby discounting the future. Objective: We tested whether attending to the present and discounting the future may moderate the influence of income on food insecurity. Design: Delay discounting and measures of future time perspective (Zimbardo Time Perspective Inventory, Consideration of Future Consequences Scale, time period of financial planning, and subjective probability of living to age 75 y) were studied as moderators of the relation between income and food insecurity in a diverse sample of 975 adults, 31.8% of whom experienced some degree of food insecurity. Results: Income, financial planning, subjective probability of living to age 75 y, and delay discounting predicted food insecurity as well as individuals who were high in food insecurity. Three-way interactions showed that delay discounting interacted with financial planning and income to predict food insecurity (P = 0.003). At lower levels of income, food insecurity was lowest for subjects who had good financial planning skills and did not discount the future, whereas having good financial skills and discounting the future had minimal influence on food insecurity. The same 3-way interaction was observed when high food insecurity was predicted (P = 0.008). Conclusion: Because of the role of scarce resources on narrowing attention and reducing prospective thinking, research should address whether modifying future orientation may reduce food insecurity even in the face of diminishing financial resources. This trial was registered at clinicaltrials.gov as NCT02099812. PMID:25008855
Overview of medical operations for a manned stratospheric balloon flight.
Blue, Rebecca S; Law, Jennifer; Norton, Sean C; Garbino, Alejandro; Pattarini, James M; Turney, Matthew W; Clark, Jonathan B
2013-03-01
Red Bull Stratos was a commercial program designed to bring a test parachutist protected by a full-pressure suit via a stratospheric balloon with a pressurized capsule to 120,000 ft (36,576 m), from which he would freefall and subsequently parachute to the ground. On March 15, 2012, the Red Bull Stratos program successfully conducted a preliminary manned balloon test flight and parachute jump, reaching a final altitude of 71,581 ft (21,818 m). In light of the uniqueness of the operation and medical threats faced, a comprehensive medical plan was needed to ensure prompt and efficient response to any medical contingencies. This report will serve to discuss the medical plans put into place before the first manned balloon flight and the actions of the medical team during that flight. The medical operations developed for this program will be systematically evaluated, particularly, specific recommendations for improvement in future high-altitude and commercial space activities. A multipronged approach to medical support was developed, consisting of event planning, medical personnel, equipment, contingency-specific considerations, and communications. Medical operations were found to be highly successful when field-tested during this stratospheric flight, and the experience allowed for refinement of medical operations for future flights. The lessons learned and practices established for this program can easily be used to tailor a plan specific to other aviation or spaceflight events.
U.S. Women's Intended Sources for Reproductive Health Care
Hall, Kelli Stidham; Patton, Elizabeth W.; Zochowski, Melissa K.; Davis, Matthew M.; Dalton, Vanessa K.
2016-01-01
Abstract Introduction: The current sociopolitical climate and context of the Affordable Care Act have led some to question the future role of family planning clinics in reproductive health care. We explored where women plan to get their future contraception, pelvic exam/pap smears, and sexually transmitted infection testing, with a focus on the role of family planning clinics. Methods: Data were drawn from a study of United States adults conducted in January 2013 from a national online panel. We focused on English-literate women aged 18–45 years who answered items on intended sources of care (private office/health maintenance organization [HMO], family planning clinic, other, would not get care) for reproductive health services. We used Rao-Scott F tests to compare intended sources across sociodemographic groups, and logistic regression to model odds of intending to use family planning clinics. Probability weights were used to adjust for the complex sampling design. Results: The response rate was 61% (n = 2,182). Of the 723 respondents who met the inclusion criteria, approximately half intended to use private offices/HMOs. Among some subgroups, including less educated (less than high school), lower annual incomes (<$25,000) and uninsured women, the proportion intending to use family planning clinics was higher than the proportion intending to use private office/HMO in unadjusted analyses. Across all service types, unmarried and uninsured status were associated with intention to use family planning clinics in multivariable models. Conclusions: While many women intend to use private offices/HMOs for their reproductive health care, family planning clinics continue to play an important role, particularly for socially disadvantaged women. PMID:26501690
NASA Technical Reports Server (NTRS)
Tartt, David M.; Hewett, Marle D.; Duke, Eugene L.; Cooper, James A.; Brumbaugh, Randal W.
1989-01-01
The Automated Flight Test Management System (ATMS) is being developed as part of the NASA Aircraft Automation Program. This program focuses on the application of interdisciplinary state-of-the-art technology in artificial intelligence, control theory, and systems methodology to problems of operating and flight testing high-performance aircraft. The development of a Flight Test Engineer's Workstation (FTEWS) is presented, with a detailed description of the system, technical details, and future planned developments. The goal of the FTEWS is to provide flight test engineers and project officers with an automated computer environment for planning, scheduling, and performing flight test programs. The FTEWS system is an outgrowth of the development of ATMS and is an implementation of a component of ATMS on SUN workstations.
OʼHara, Susan
2014-01-01
Nurses have increasingly been regarded as critical members of the planning team as architects recognize their knowledge and value. But the nurses' role as knowledge experts can be expanded to leading efforts to integrate the clinical, operational, and architectural expertise through simulation modeling. Simulation modeling allows for the optimal merge of multifactorial data to understand the current state of the intensive care unit and predict future states. Nurses can champion the simulation modeling process and reap the benefits of a cost-effective way to test new designs, processes, staffing models, and future programming trends prior to implementation. Simulation modeling is an evidence-based planning approach, a standard, for integrating the sciences with real client data, to offer solutions for improving patient care.
Strategic foresight: how planning for the unpredictable can improve environmental decision-making.
Cook, Carly N; Inayatullah, Sohail; Burgman, Mark A; Sutherland, William J; Wintle, Brendan A
2014-09-01
Advanced warning of potential new opportunities and threats related to biodiversity allows decision-makers to act strategically to maximize benefits or minimize costs. Strategic foresight explores possible futures, their consequences for decisions, and the actions that promote more desirable futures. Foresight tools, such as horizon scanning and scenario planning, are increasingly used by governments and business for long-term strategic planning and capacity building. These tools are now being applied in ecology, although generally not as part of a comprehensive foresight strategy. We highlight several ways foresight could play a more significant role in environmental decisions by: monitoring existing problems, highlighting emerging threats, identifying promising new opportunities, testing the resilience of policies, and defining a research agenda. Copyright © 2014 Elsevier Ltd. All rights reserved.
Distribution analysis for F100(3) engine
NASA Technical Reports Server (NTRS)
Walter, W. A.; Shaw, M.
1980-01-01
The F100(3) compression system response to inlet circumferential distortion was investigated using an analytical compressor flow model. Compression system response to several types of distortion, including pressure, temperature, and combined pressure/temperature distortions, was investigated. The predicted response trends were used in planning future F100(3) distortion tests. Results show that compression system response to combined temperature and pressure distortions depends upon the relative orientation, as well as the individual amplitudes and circumferential extents of the distortions. Also the usefulness of the analytical predictions in planning engine distortion tests is indicated.
12th Annual Science and Engineering Technology Conference/DoD TECH Exposition
2011-06-23
compound when planning horizons grow: long design - test - build-field-adapt lead-times exacerbate uncertain futures problems, overload designs , and...ERS Environment ERS: Tools and Technologies to Facilitate Adaptability & Trustability 4. Tying design , physical and computational testing 6...science, engineering concepts, processes, and design tools to: • Continuously coordinate design , testing , and production with warfighter review to
NASA Technical Reports Server (NTRS)
1982-01-01
Information on the Japanese National Aerospace Laboratory two dimensional transonic wind tunnel, completed at the end of 1979 is presented. Its construction is discussed in detail, and the wind tunnel structure, operation, test results, and future plans are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ronevich, Joseph Allen; Balch, Dorian K.; San Marchi, Christopher W.
2015-12-01
This project was intended to enable SNL-CA to produce appropriate specimens of relevant stainless steels for testing and perform baseline testing of weld heat-affected zone and weld fusion zone. One of the key deliverables in this project was to establish a procedure for fracture testing stainless steel weld fusion zone and heat affected zones that were pre-charged with hydrogen. Following the establishment of the procedure, a round robin was planned between SNL-CA and SRNL to ensure testing consistency between laboratories. SNL-CA and SRNL would then develop a comprehensive test plan, which would include tritium exposures of several years at SRNLmore » on samples delivered by SNL-CA. Testing would follow the procedures developed at SNL-CA. SRNL will also purchase tritium charging vessels to perform the tritium exposures. Although comprehensive understanding of isotope-induced fracture in GTS reservoir materials is a several year effort, the FY15 work would enabled us to jump-start the tests and initiate long-term tritium exposures to aid comprehensive future investigations. Development of a procedure and laboratory testing consistency between SNL-CA and SNRL ensures reliability in results as future evaluations are performed on aluminum alloys and potentially additively-manufactured components.« less
Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing
NASA Technical Reports Server (NTRS)
Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.
1990-01-01
During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.
High-voltage Array Ground Test for Direct-drive Solar Electric Propulsion
NASA Technical Reports Server (NTRS)
Howell, Joe T.; Mankins, John C.; O'Neill, Mark J.
2005-01-01
Development is underway on a unique high-power solar concentrator array called Stretched Lens Array (SLA) for direct drive electric propulsion. These SLA performance attributes closely match the critical needs of solar electric propulsion (SEP) systems, which may be used for "space tugs" to fuel-efficiently transport cargo from low earth orbit (LEO) to low lunar orbit (LLO), in support of NASA s robotic and human exploration missions. Later SEP systems may similarly transport cargo from the earth-moon neighborhood to the Mars neighborhood. This paper will describe the SLA SEP technology, discuss ground tests already completed, and present plans for future ground tests and future flight tests of SLA SEP systems.
NASA Astrophysics Data System (ADS)
Dittes, Beatrice; Kaiser, Maria; Špačková, Olga; Rieger, Wolfgang; Disse, Markus; Straub, Daniel
2018-05-01
Planning authorities are faced with a range of questions when planning flood protection measures: is the existing protection adequate for current and future demands or should it be extended? How will flood patterns change in the future? How should the uncertainty pertaining to this influence the planning decision, e.g., for delaying planning or including a safety margin? Is it sufficient to follow a protection criterion (e.g., to protect from the 100-year flood) or should the planning be conducted in a risk-based way? How important is it for flood protection planning to accurately estimate flood frequency (changes), costs and damage? These are questions that we address for a medium-sized pre-alpine catchment in southern Germany, using a sequential Bayesian decision making framework that quantitatively addresses the full spectrum of uncertainty. We evaluate different flood protection systems considered by local agencies in a test study catchment. Despite large uncertainties in damage, cost and climate, the recommendation is robust for the most conservative approach. This demonstrates the feasibility of making robust decisions under large uncertainty. Furthermore, by comparison to a previous study, it highlights the benefits of risk-based planning over the planning of flood protection to a prescribed return period.
Yoshida, Kunihiro; Tamai, Mariko; Kubota, Takeo; Kawame, Hiroshi; Amano, Naoji; Ikeda, Shu-ichi; Fukushima, Yoshimitsu
2002-02-01
Predictive genetic testing for hereditary neuromuscular diseases is a delicate issue for individuals at risk and their families, as well as for medical staff because these diseases are often late-onset and intractable. Therefore careful pre- and post-test genetic counseling and psychosocial support should be provided along with such genetic testing. The Division of Clinical and Molecular Genetics was established at our hospital in May 1996 to provide skilled professional genetic counseling. Since its establishment, 14 individuals have visited our clinic to request predictive genetic testing for hereditary neuromuscular diseases (4 for myotonic dystrophy, 6 for spinocerebellar ataxia, 3 for Huntington's disease, and 1 for Alzheimer's disease). The main reasons for considering testing were to remove uncertainty about the genetic status and to plan for the future. Nine of 14 individuals requested testing for making decisions about a forthcoming marriage or pregnancy (family planning). Other reasons raised by the individuals included career or financial planning, planning for their own health care, and knowing the risk for their children. At the first genetic counseling session, all of the individuals expressed hopes of not being a gene carrier and of escaping from fear of disease, and seemed not to be mentally well prepared for an increased-risk result. To date, 7 of the 14 individuals have received genetic testing and only one, who underwent predictive genetic testing for spinocerebellar ataxia, was given an increased-risk result. The seven individuals including the one with an increased-risk result, have coped well with their new knowledge about their genetic status after the testing results were disclosed. None of them has expressed regret. In pre-test genetic counseling sessions, we consider it quite important not only to determine the psychological status of the individual, but also to make the individual try to anticipate the changes in his/her life upon receiving an increased-risk or a decreased-risk result. Sufficient time should be taken to build a good relationship between the individual and his/her family and the medical staff during pre-test counseling sessions. This will help the individuals feel satisfied with their own decisions for the future, whether they receive genetic testing or not.
ERIC Educational Resources Information Center
Griffiths, Thomas L.; Tenenbaum, Joshua B.
2011-01-01
Predicting the future is a basic problem that people have to solve every day and a component of planning, decision making, memory, and causal reasoning. In this article, we present 5 experiments testing a Bayesian model of predicting the duration or extent of phenomena from their current state. This Bayesian model indicates how people should…
Development Overview of the Revised NASA Ultra Long Duration Balloon
NASA Technical Reports Server (NTRS)
Cathey, H. M.; Gregory, D; Young, L.; Pierce, D.
2006-01-01
The development of the National Aeronautics and Space Administration s (NASA) Ultra Long Duration Balloon (ULDB) has made significant strides in addressing the deployment issues experienced in the scaling up of the balloon structure. This paper concentrates on the super-pressure balloon developments that have been, and are currently being planned by the NASA Balloon Program Office at Goddard Space Flight Center s Wallops Flight Facility. The goal of the NASA ULDB development project is to attempt to extend the potential flight durations for large scientific balloon payloads. A summary of the February 2005 test flight from Ft. Sumner, New Mexico will be presented. This test flight spurred a number of investigations and advancements for this project. The development path has pursued some new approaches in the design, analysis, and testing of the balloons. New issues have been ideEti6ed throu& both analysis md testing. These have been addressed in the design stage before the next balloon construction was begun. This paper will give an overview of the recent history for this effort and the development approach pursued for ULDB. A description of the balloon design, including the modifications made as a result of the lessons learned, will be presented. Areas to be presented include the design approach, deployment issues that have been encountered and the proposed solutions, ground testing, photogrammetry, and an analysis overview. Test flight planning and considerations will be presented including test flight safety. An extended duration test flight of the National Aeronautics and Space Administration s Ultra Long Duration Balloon is planned for the May/June 2006 time frame. This flight is expected to fly from Sweden to either Canada or Alaska. Preliminary results of this flight will be presented as available. Future plans for both ground testing and additional test flights will also be presented. Goals of the future test flights, which are staged in increments of increasing suspended load and altitude, will be presented. This will include the projected balloon volumes, payload capabilities, test flight locations, and proposed flight schedule.
Automatic satellite capture and berthing with robot arm (ASCABRA)
NASA Technical Reports Server (NTRS)
Inaba, Noriyasu; Wakabayashi, Yasufumi; Iijima, Takahiko
1994-01-01
The NASDA office of R&D is studying an automatic technique to capture and berth free-floating satellites using a robot arm on another satellite. A demonstration experiment plan with the Japanese engineering test satellite ETS-7 is being developed based on the basic research on the ground. The overview and key technologies of this experiment plan are presented, and future applications of the automatic capture technique are also reviewed.
First Crewed Flight: Rationale, Considerations and Challenges from the Constellation Experience
NASA Technical Reports Server (NTRS)
Noriega, Carlos; Arceneaux, William; Williams, Jeffrey A.; Rhatigan, Jennifer L.
2011-01-01
NASA's Constellation Program has made the most progress in a generation towards building an integrated human-rated spacecraft and launch vehicle. During that development, it became clear that NASA's human-rating requirements lacked the specificity necessary to defend a program plan, particularly human-rating test flight plans, from severe budget challenges. This paper addresses the progress Constellation achieved, problems encountered in clarifying and defending a human-rating certification plan, and discusses key considerations for those who find themselves in similar straits with future human-rated spacecraft and vehicles. We assert, and support with space flight data, that NASA's current human-rating requirements do not adequately address "unknown-unknowns", or the unexpected things the hardware can reveal to the designer during test.
Achieving Maximum Integration Utilizing Requirements Flow Down
NASA Technical Reports Server (NTRS)
Archiable, Wes; Askins, Bruce
2011-01-01
A robust and experienced systems engineering team is essential for a successful program. It is often a challenge to build a core systems engineering team early enough in a program to maximize integration and assure a common path for all supporting teams in a project. Ares I was no exception. During the planning of IVGVT, the team had many challenges including lack of: early identification of stakeholders, team training in NASA s system engineering practices, solid requirements flow down and a top down documentation strategy. The IVGVT team started test planning early in the program before the systems engineering framework had been matured due to an aggressive schedule. Therefore the IVGVT team increased their involvement in the Constellation systems engineering effort. Program level requirements were established that flowed down to IVGVT aligning all stakeholders to a common set of goals. The IVGVT team utilized the APPEL REQ Development Management course providing the team a NASA focused model to follow. The IVGVT team engaged directly with the model verification and validation process to assure that a solid set of requirements drove the need for the test event. The IVGVT team looked at the initial planning state, analyzed the current state and then produced recommendations for the ideal future state of a wide range of systems engineering functions and processes. Based on this analysis, the IVGVT team was able to produce a set of lessons learned and to provide suggestions for future programs or tests to use in their initial planning phase.
Nuclear Weapons: Comprehensive Test Ban Treaty
2007-07-12
done. Critics raised concerns about the implications of these policies for testing and new weapons. At present, Congress addresses nuclear weapon...future, but there are no plans to do so.’”7 Critics expressed concern about the implications of these policies for testing and new weapons. A statement by...opportunity to design and build new nuclear weapons, and abandon a ten-year-old moratorium on nuclear weapons testing.”8 Another critic felt that
Nuclear Weapons: Comprehensive Test Ban Treaty
2007-10-29
which has been done. Critics raised concerns about the implications of these policies for testing and new weapons. At present, Congress addresses...Comprehensive Test Ban Treaty Most Recent Developments On October 24, Senator Jon Kyl delivered a speech critical of the CTBT and of Section 3122 in...future, but there are no plans to do so.’”5 Critics expressed concern about the implications of these policies for testing and new weapons. A statement
Commissioning and First Results from the Fermilab Cryomodule Test Stand
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harms, Elvin; et al.
2017-05-01
A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2008-09-18
needed to conduct a nuclear test. Critics raised concerns about the implications of these policies for testing and new weapons. At present, Congress...as it is reduced, is reliable and safe. So he has not ruled out testing in the future, but there are no plans to do so.’”4 Critics expressed concern...ten-year-old moratorium on nuclear weapons testing.”5 Another critic felt that increased funding for test readiness would in effect give prior
Urich, Christian; Rauch, Wolfgang
2014-12-01
Long-term projections for key drivers needed in urban water infrastructure planning such as climate change, population growth, and socio-economic changes are deeply uncertain. Traditional planning approaches heavily rely on these projections, which, if a projection stays unfulfilled, can lead to problematic infrastructure decisions causing high operational costs and/or lock-in effects. New approaches based on exploratory modelling take a fundamentally different view. Aim of these is, to identify an adaptation strategy that performs well under many future scenarios, instead of optimising a strategy for a handful. However, a modelling tool to support strategic planning to test the implication of adaptation strategies under deeply uncertain conditions for urban water management does not exist yet. This paper presents a first step towards a new generation of such strategic planning tools, by combing innovative modelling tools, which coevolve the urban environment and urban water infrastructure under many different future scenarios, with robust decision making. The developed approach is applied to the city of Innsbruck, Austria, which is spatially explicitly evolved 20 years into the future under 1000 scenarios to test the robustness of different adaptation strategies. Key findings of this paper show that: (1) Such an approach can be used to successfully identify parameter ranges of key drivers in which a desired performance criterion is not fulfilled, which is an important indicator for the robustness of an adaptation strategy; and (2) Analysis of the rich dataset gives new insights into the adaptive responses of agents to key drivers in the urban system by modifying a strategy. Copyright © 2014 Elsevier Ltd. All rights reserved.
ERIC Educational Resources Information Center
Curtis, W. Scott
The purpose of this project was to inquire into the current status of development, past use, availability, and future planning of intelligence tests for the visually handicapped in relation to the fields of psychological, educational, and vocational counseling. The project procedure was that of a research utilization conference involving the…
Crane Cell Testing Support of Nasa/goddard Space Flight Center: an Update
NASA Technical Reports Server (NTRS)
Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.
2001-01-01
The objective of this paper is to verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs, disseminate the data - to develop a plan for in-orbit battery management - to design a cell/battery for future NASA spacecraft and establish a cell test data base for rechargeable cell/batteries.
ERIC Educational Resources Information Center
Educational Testing Service, Princeton, NJ.
The 1966 meeting of the Western Regional Conference on Testing Problems dealt with accelerated educational change. The following speeches were presented: (1) "Access to Higher Education: Implications for Future Planning" by Richard Pearson; (2) "The Differentiated Youth: A Challenge to Traditional Institutions" by Joseph D. Lohman; (3) "Teaching…
Burke, Meghan; Arnold, Catherine; Owen, Aleksa
2018-04-01
Although individuals with intellectual and developmental disabilities (IDD) are living longer lives, fewer than half of parents of individuals with IDD conduct future planning. The correlates and barriers to future planning must be identified to develop targeted interventions to facilitate future planning. In this study, 388 parents of individuals with IDD responded to a national, web-based survey. Participants who were older, more educated, attended more parent training and support activities, and had children with fewer functional abilities, were more likely to engage in future planning. Reported barriers to future planning included: (a) lack of available services, (b) financial challenges, (c) reluctance of family members, (d) lack of time, (e) the emotional nature of future planning, (f) inertia, and (g) a lack of family members to be caregivers. Implications for policy, practice, and future research are discussed.
Planning for the future of transportation : connected vehicles.
DOT National Transportation Integrated Search
2015-01-01
For the past decade, the U.S. Department of Transportation (USDOT) has been researching and testing a system of vehicles that can sense the environment around them and communicate with other vehicles and with infrastructure. This vehicle-to-vehicle (...
Prototype electron lens set-up for the Tevatron beam-beam compensation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, C.; Saewert, G.; Santucci, J.
1999-05-17
A prototype "electron lens" for the Tevatron beam-beam compensation project is commissioned at Fermilab. We de-scribe the set-up, report results of the first tests of the elec-tron beam, and discuss future plans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eckman, Todd J.; Hertzel, Ali K.; Lane, James J.
In 2013, the U.S. Department of Energy's (DOE) Hanford Site, located in Washington State, funded an update to the critical network infrastructure supporting the Hanford Federal Cloud (HFC). The project, called ET-50, was the final step in a plan that was initiated five years ago called "Hanford's IT Vision, 2015 and Beyond." The ET-50 project upgraded Hanford's core data center switches and routers along with a majority of the distribution layer switches. The upgrades allowed HFC the network intelligence to provide Hanford with a more reliable and resilient network architecture. The culmination of the five year plan improved network intelligencemore » and high performance computing as well as helped to provide 10 Gbps capable links between core backbone devices (10 times the previous bandwidth). These improvements allow Hanford the ability to further support bandwidth intense applications, such as video teleconferencing. The ET-50 switch upgrade, along with other upgrades implemented from the five year plan, have prepared Hanford's network for the next evolution of technology in voice, video, and data. Hand-in-hand with ET-50's major data center outage, Mission Support Alliance's (MSA) Information Management (IM) organization executed a disaster recovery (DR) exercise to perform a true integration test and capability study. The DR scope was planned within the constraints of ET-50's 14 hour datacenter outage window. This DR exercise tested Hanford's Continuity of Operations (COOP) capability and failover plans for safety and business critical Hanford Federal Cloud applications. The planned suite of services to be tested was identified prior to the outage and plans were prepared to test the services ability to failover from the primary Hanford data center to the backup data center. The services tested were: Core Network (backbone, firewall, load balancers); Voicemail; Voice over IP (VoIP); Emergency Notification; Virtual desktops; and, Select set of production applications and data. The primary objective of the exercise was to test COOP around the emergency operations at Hanford to provide information on capabilities and dependencies of the current system to insure improved focus of emergency, safety and security capacity in a disaster situation. The integration of the DR test into the ET-50 project allowed the testing of COOP at Hanford and allowed the lessons learned to be defined. These lessons learned have helped improve the understanding of Hanford's COOP capabilities and will be critical for future planning. With the completion of the Hanford Federal Cloud network upgrades and the disaster recovery exercise, the MSA has a clearer path forward for future technology implementations as well as network improvements to help shape the usability and reliability of the Hanford network in support of the cleanup mission.« less
US Navy Global and Regional Wave Modeling
2014-09-01
Future plans call for increasing the resolution to 0.5 degree, upgrading to WW3 version 4, and including the ...NAVOCEANO WW3 system is in the early stages, and a number of key shortcomings have been identified for future improvement. The multigrid sys- tem...J. Shriver, R. Helber, P. Spence, S . Carroll, O.M. Smedstad, and B. Lunde. 2011. Validation Test Report for the Navy Coupled Ocean
It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).
Rummel, John D; Kminek, Gerhard
2018-04-01
The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.
NASA Astrophysics Data System (ADS)
Arkema, Katie K.; Verutes, Gregory; Bernhardt, Joanna R.; Clarke, Chantalle; Rosado, Samir; Canto, Maritza; Wood, Spencer A.; Ruckelshaus, Mary; Rosenthal, Amy; McField, Melanie; de Zegher, Joann
2014-11-01
Integrated coastal and ocean management requires transparent and accessible approaches for understanding the influence of human activities on marine environments. Here we introduce a model for assessing the combined risk to habitats from multiple ocean uses. We apply the model to coral reefs, mangrove forests and seagrass beds in Belize to inform the design of the country’s first Integrated Coastal Zone Management (ICZM) Plan. Based on extensive stakeholder engagement, review of existing legislation and data collected from diverse sources, we map the current distribution of coastal and ocean activities and develop three scenarios for zoning these activities in the future. We then estimate ecosystem risk under the current and three future scenarios. Current levels of risk vary spatially among the nine coastal planning regions in Belize. Empirical tests of the model are strong—three-quarters of the measured data for coral reef health lie within the 95% confidence interval of interpolated model data and 79% of the predicted mangrove occurrences are associated with observed responses. The future scenario that harmonizes conservation and development goals results in a 20% reduction in the area of high-risk habitat compared to the current scenario, while increasing the extent of several ocean uses. Our results are a component of the ICZM Plan for Belize that will undergo review by the national legislature in 2015. This application of our model to marine spatial planning in Belize illustrates an approach that can be used broadly by coastal and ocean planners to assess risk to habitats under current and future management scenarios.
Drinking Water: Experts’ Views on How Future Federal Funding Can Best Be Spent to Improve Security
2003-10-01
training to support, among other things, simulation exercises to provide responders with experience in carrying out emergency response plans; specialized...attack. These activities include, among other things, support for simulation exercises to provide responders with experience in carrying out utilities...conducting regional simulation exercises to test emergency response plans, with more than 88 percent (38 of 43) rating this as a high or highest
2017-03-06
NASA Glenn engineer Dr. Peter Peterson prepares a high-power Hall thruster for ground testing in a vacuum chamber that simulates the environment in space. This high-powered solar electric propulsion thruster has been identified as a critical part of NASA’s future deep space exploration plans.
HIV Infection and Health Policy.
ERIC Educational Resources Information Center
Weiss, Robin; Hardy, Leslie M.
1990-01-01
Describes issues facing policymakers dealing with the human immunodeficiency virus (HIV) epidemic. Addresses six challenges for policymakers: (1) protecting people from discrimination; (2) designing testing and screening programs; (3) developing safe and effective antiviral drugs; (4) planning for future vaccine trials; (5) organizing and…
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2010-01-06
the future, but there are no plans to do so.’”5 Critics expressed concern about the implications of these policies for testing and new weapons. A...seek the opportunity to design and build new nuclear weapons, and abandon a ten-year-old moratorium on nuclear weapons testing.”6 Another critic felt...warhead critical the U.S. nuclear deterrent without conducting a nuclear test.10 Similarly, a Statement of Administration Policy on S. 1547, FY2008
Long-range planning cost model for support of future space missions by the deep space network
NASA Technical Reports Server (NTRS)
Sherif, J. S.; Remer, D. S.; Buchanan, H. R.
1990-01-01
A simple model is suggested to do long-range planning cost estimates for Deep Space Network (DSP) support of future space missions. The model estimates total DSN preparation costs and the annual distribution of these costs for long-range budgetary planning. The cost model is based on actual DSN preparation costs from four space missions: Galileo, Voyager (Uranus), Voyager (Neptune), and Magellan. The model was tested against the four projects and gave cost estimates that range from 18 percent above the actual total preparation costs of the projects to 25 percent below. The model was also compared to two other independent projects: Viking and Mariner Jupiter/Saturn (MJS later became Voyager). The model gave cost estimates that range from 2 percent (for Viking) to 10 percent (for MJS) below the actual total preparation costs of these missions.
Planning and managing future space facility projects. [management by objectives and group dynamics
NASA Technical Reports Server (NTRS)
Sieber, J. E.; Wilhelm, J. A.; Tanner, T. A.; Helmreich, R. L.; Burgenbauch, S. F.
1979-01-01
To learn how ground-based personnel of a space project plan and organize their work and how such planning and organizing relate to work outcomes, longitudinal study of the management and execution of the Space Lab Mission Development Test 3 (SMD 3) was performed at NASA Ames Research Center. A view of the problems likely to arise in organizations and some methods of coping with these problems are presented as well as the conclusions and recommendations that pertain strictly to SMD 3 management. Emphasis is placed on the broader context of future space facility projects and additional problems that may be anticipated. A model of management that may be used to facilitate problem solving and communication - management by objectives (MBO) is presented. Some problems of communication and emotion management that MBO does not address directly are considered. Models for promoting mature, constructive and satisfying emotional relationships among group members are discussed.
Risk-based water resources planning: Incorporating probabilistic nonstationary climate uncertainties
NASA Astrophysics Data System (ADS)
Borgomeo, Edoardo; Hall, Jim W.; Fung, Fai; Watts, Glenn; Colquhoun, Keith; Lambert, Chris
2014-08-01
We present a risk-based approach for incorporating nonstationary probabilistic climate projections into long-term water resources planning. The proposed methodology uses nonstationary synthetic time series of future climates obtained via a stochastic weather generator based on the UK Climate Projections (UKCP09) to construct a probability distribution of the frequency of water shortages in the future. The UKCP09 projections extend well beyond the range of current hydrological variability, providing the basis for testing the robustness of water resources management plans to future climate-related uncertainties. The nonstationary nature of the projections combined with the stochastic simulation approach allows for extensive sampling of climatic variability conditioned on climate model outputs. The probability of exceeding planned frequencies of water shortages of varying severity (defined as Levels of Service for the water supply utility company) is used as a risk metric for water resources planning. Different sources of uncertainty, including demand-side uncertainties, are considered simultaneously and their impact on the risk metric is evaluated. Supply-side and demand-side management strategies can be compared based on how cost-effective they are at reducing risks to acceptable levels. A case study based on a water supply system in London (UK) is presented to illustrate the methodology. Results indicate an increase in the probability of exceeding the planned Levels of Service across the planning horizon. Under a 1% per annum population growth scenario, the probability of exceeding the planned Levels of Service is as high as 0.5 by 2040. The case study also illustrates how a combination of supply and demand management options may be required to reduce the risk of water shortages.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thind, K; Tolakanahalli, R
2014-08-15
The aim of this study was to analyze the feasibility of designing comprehensive QA plans using iComCAT for Elekta machines equipped with Agility multileaf collimator and continuously variable dose rate. Test plans with varying MLC speed, gantry speed, and dose rate were created and delivered in a controlled manner. A strip test was designed with three 1 cm MLC positions and delivered using dynamic, StepNShoot and VMAT techniques. Plans were also designed to test error in MLC position with various gantry speeds and various MLC speeds. The delivery fluence was captured using the electronic portal-imaging device. Gantry speed was foundmore » to be within tolerance as per the Canadian standards. MLC positioning errors at higher MLC speed with gravity effects does add more than 2 mm discrepancy. More tests need to be performed to evaluate MLC performance using independent measurement systems. The treatment planning system with end-to-end testing necessary for commissioning was also investigated and found to have >95% passing rates within 3%/3mm gamma criteria. Future studies involve performing off-axis gantry starshot pattern and repeating the tests on three matched Elekta linear accelerators.« less
An Overview of the NASA Aeronautics Test Program Strategic Plan
NASA Technical Reports Server (NTRS)
Marshall, Timothy J.
2010-01-01
U.S. leadership in aeronautics depends on ready access to technologically advanced, efficient, and affordable aeronautics test capabilities. These systems include major wind tunnels and propulsion test facilities and flight test capabilities. The federal government owns the majority of the major aeronautics test capabilities in the United States, primarily through the National Aeronautics and Space Administration (NASA) and the Department of Defense (DoD), however an overarching strategy for management of these national assets was needed. Therefore, in Fiscal Year (FY) 2006 NASA established the Aeronautics Test Program (ATP) as a two-pronged strategic initiative to: (1) retain and invest in NASA aeronautics test capabilities considered strategically important to the agency and the nation, and (2) establish a strong, high level partnership with the DoD Test Resources Management Center (TRMC), stewards of the DoD test and evaluation infrastructure. Since then, approximately seventy percent of the ATP budget has been directed to underpin fixed and variable costs of facility operations within its portfolio and the balance towards strategic investments in its test facilities, including maintenance and capability upgrades. Also, a strong guiding coalition was established through the National Partnership for Aeronautics Testing (NPAT), with governance by the senior leadership of NASA s Aeronautics Research Mission Directorate (ARMD) and the DoD's TRMC. As part of its strategic planning, ATP has performed or participated in many studies and analyses, including assessments of major NASA and DoD aeronautics test capabilities, test facility condition evaluations and market research. The ATP strategy has also benefitted from unpublished RAND research and analysis by Ant n et al. (2009). Together, these various studies, reports and assessments serve as a foundation for a new, five year strategic plan that will guide ATP through FY 2014. Our vision for the future is a balanced portfolio of aeronautics ground and flight test capabilities that advance U.S. leadership in aeronautics in the short and long term. Key to the ATP vision is the concept of availability, not necessarily ownership; that is, NASA does not have to own and operate all facilities that are envisioned for future aeronautics testing. However, ATP will enable access to capabilities which are needed but not owned by NASA through strategic partnerships and reliance agreements. This paper will outline the major aspects of the ATP strategic plan for achieving its mission.
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2013-06-10
subcritical; that is, no critical mass is formed and no self-sustaining nuclear chain reaction can occur; thus, there is no nuclear explosion.”211 SCEs...45 The National Academy of Sciences Study and Its Critics ...the future, but there are no plans to do so.”8 Critics expressed concern about the implications of these policies for testing and new weapons
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2012-08-03
Academy of Sciences Study and Its Critics ....................................................... 39 Chronology... criticisms of that report. On February 13, the Administration rolled out its FY2013 budget request, which included funds for the CTBT Organization...So he has not ruled out testing in the future, but there are no plans to do so.”4 Critics expressed concern about the implications of these policies
Remembering the past and planning for the future in rats
Crystal, Jonathon D.
2012-01-01
A growing body of research suggests that rats represent and remember specific earlier events from the past. An important criterion for validating a rodent model of episodic memory is to establish that the content of the representation is about a specific event in the past rather than vague information about remoteness. Recent evidence suggests that rats may also represent events that are anticipated to occur in the future. An important capacity afforded by a representation of the future is the ability to plan for the occurrence of a future event. However, relatively little is known about the content of represented future events and the cognitive mechanisms that may support planning. This article reviews evidence that rats remember specific earlier events from the past, represent events that are anticipated to ccur in the future, and develops criteria for validating a rodent model of future planning. These criteria include representing a specific time in the future, the ability to temporarily disengage from a plan and reactivate the plan at an appropriate time in the future, and flexibility to deploy a plan in novel conditions. PMID:23219951
ERIC Educational Resources Information Center
Burke, Meghan; Arnold, Catherine; Owen, Aleksa
2018-01-01
Although individuals with intellectual and developmental disabilities (IDD) are living longer lives, fewer than half of parents of individuals with IDD conduct future planning. The correlates and barriers to future planning must be identified to develop targeted interventions to facilitate future planning. In this study, 388 parents of individuals…
Planning for a Nondriving Future: Behaviors and Beliefs Among Middle-Aged and Older Drivers.
Harmon, Annie C; Babulal, Ganesh; Vivoda, Jonathon M; Zikmund-Fisher, Brian J; Carr, David B
2018-01-01
Despite the reality of older adults living many years after driving cessation, few prepare for the eventuality; empirically, planning for a nondriving future has not been directly quantified or explored. The following study quantifies 1) the extent of current drivers' planning, 2) specific planning behaviors, 3) beliefs about benefits of planning, 4) drivers' intention to plan more for future transportation needs, and 5) group differences associated with planning. In a predominantly female, black, urban sample of current drivers ages 53-92, fewer than half (42.1%) had planned at all for a nondriving future, with correspondingly low levels of planning behaviors reported. However, over 80% believed planning would help them meet their needs post-cessation and transition emotionally to being a nondriver. Most (85%) intended to plan more in the future as well, indicating further potential openness to the topic. Drivers who planned were older, drove less frequently, limited their driving to nearby places, reported less difficulty believing they would become a nondriver, and expected to continue driving three years less than non-planners. These findings suggest that drivers' perceived nearness to driving cessation impacts planning for future transportation needs, and existing perceived benefits of planning may provide leverage to motivate action.
NASA ATP Force Measurement Technology Capability Strategic Plan
NASA Technical Reports Server (NTRS)
Rhew, Ray D.
2008-01-01
The Aeronautics Test Program (ATP) within the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) initiated a strategic planning effort to re-vitalize the force measurement capability within NASA. The team responsible for developing the plan included members from three NASA Centers (Langley, Ames and Glenn) as well as members from the Air Force s Arnold Engineering and Development Center (AEDC). After visiting and discussing force measurement needs and current capabilities at each participating facility as well as selected force measurement companies, a strategic plan was developed to guide future NASA investments. This paper will provide the details of the strategic plan and include asset management, organization and technology research and development investment priorities as well as efforts to date.
NASA Glenn PSL-3 and 4 Control System Upgrade
NASA Technical Reports Server (NTRS)
Lizanich, Paul J.
2010-01-01
An overview of the PSL-3&4 Jet Engine Test Facility control system; including its history, a description of the present effort to upgrade from Emerson Ovation v2.2 to V3.3.1, and future upgrade plans is shown.
Recent advances in materials toxicology
NASA Technical Reports Server (NTRS)
Russo, D. M.
1979-01-01
An overview of the fire toxicology program, its principal objectives and approach, is outlined. The laboratory methods of assessing pyrolysis product toxicity for two experiments are presented. The two experiments are: a comparison of test end points; and an evaluation of operant techniques. A third experiment is outlined for a comparison of full-scale and laboratory toxicity tests, with the purpose of determining animal survivability in full-scale tests. Future research plans are also outlined.
NASA Technical Reports Server (NTRS)
Murrow, H. N.
1981-01-01
Results from flight tests of the ARW-1 research wing are presented. Preliminary loads data and experiences with the active control system for flutter suppression are included along with comparative results of test and prediction for the flutter boundary of the supercritical research wing and on performance of the flutter suppression system. The status of the ARW-2 research wing is given.
Launch Abort System Flight Test Overview
NASA Technical Reports Server (NTRS)
Williams-Hayes, Peggy; Bosworth, John T.
2007-01-01
This viewgraph presentation is an overview of the Launch Abort System (LAS) for the Constellation Program. The purpose of the paper is to review the planned tests for the LAS. The program will evaluate the performance of the crew escape functions of the Launch Abort System (LAS) specifically: the ability of the LAS to separate from the crew module, to gather flight test data for future design and implementation and to reduce system development risks.
Ampe, Sophie; Sevenants, Aline; Smets, Tinne; Declercq, Anja; Van Audenhove, Chantal
2017-01-01
(1) To pilot 'we DECide' in terms of influence on advance care planning policy and practice in nursing home dementia care units. (2) To investigate barriers and facilitators for implementing 'we DECide'. This was a pre-test-post-test study in 18 nursing homes. Measurements included: compliance with best practice of advance care planning policy (ACP-audit); advance care planning practice (ACP criteria: degree to which advance care planning was discussed, and OPTION scale: degree of involvement of residents and families in conversations). Advance care planning policy was significantly more compliant with best practice after 'we DECide'; policy in the control group was not. Advance care planning was not discussed more frequently, nor were residents and families involved to a higher degree in conversations after 'we DECide'. Barriers to realizing advance care planning included staff's limited responsibilities; facilitators included support by management staff, and involvement of the whole organization. 'We DECide' had a positive influence on advance care planning policy. Daily practice, however, did not change. Future studies should pay more attention to long-term implementation strategies. Long-term implementation of advance care planning requires involvement of the whole organization and a continuing support system for health care professionals. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
High Misalignment Carbon Seals for the Fan Drive Gear System Technologies
NASA Technical Reports Server (NTRS)
Shaughnessy, Dennis; Dobek, Lou
2006-01-01
Aircraft engines of the future will require capability bearing compartment seals than found in current engines. Geared systems driving the fan will be subjected to inertia and gyroscopic forces resulting in extremely high angular and radial misalignments. Because of the high misalignment levels, compartment seals capable of accommodating angularities and eccentricities are required. Pratt & Whitney and Stein Seal Company selected the segmented circumferential carbon seal as the best candidate to operate at highly misaligned conditions. Initial seal tests established the misalignment limits of the current technology circumferential seal. From these results a more compliant seal configuration was conceived, designed, fabricated, and tested. Further improvements to the design are underway and plans are to conduct a durability test of the next phase configuration. A technical approach is presented, including design modification to a "baseline"seal, carbon grade selection, test rig configuration, test plan and results of analysis of seal testing.
Full power level development of the Space Shuttle main engine
NASA Technical Reports Server (NTRS)
Johnson, J. R.; Colbo, H. I.
1982-01-01
Development of the Space Shuttle main engine for nominal operation at full power level (109 percent rated power) is continuing in parallel with the successful flight testing of the Space Transportation System. Verification of changes made to the rated power level configuration currently being flown on the Orbiter Columbia is in progress and the certification testing of the full power level configuration has begun. The certification test plan includes the accumulation of 10,000 seconds on each of two engines by early 1983. Certification testing includes the simulation of nominal mission duty cycles as well as the two abort thrust profiles: abort to orbit and return to launch site. Several of the certification tests are conducted at 111 percent power to demonstrate additional safety margins. In addition to the flight test and development program results, future plans for life demonstration and engine uprating will be discussed.
The Development of NASA's Fault Management Handbook
NASA Technical Reports Server (NTRS)
Dennehy, Cornelius J.; Fesq, Lorraine M.; Barth, Timothy; Clark, Micah; Day, John; Fretz, Kristen; Friberg, Kenneth; Johnson, Stephen; Hattis, Philip; McComas, David;
2011-01-01
NASA is developing a FM Handbook to establish guidelines and to provide recommendations for defining, developing, analyzing, evaluating, testing, and operating FM systems. It establishes a process for developing FM throughout the lifecycle of a mission and provides a basis for moving the field toward a formal and consistent FM methodology to be applied on future programs. This paper describes the motivation for, the development of, and the future plans for the NASA FM Handbook.
NASA Technical Reports Server (NTRS)
Cole, Stanley R.; Garcia, Jerry L.
2000-01-01
The NASA Langley Transonic Dynamics Tunnel (TDT) has provided a unique capability for aeroelastic testing for forty years. The facility has a rich history of significant contributions to the design of many United States commercial transports, military aircraft, launch vehicles, and spacecraft. The facility has many features that contribute to its uniqueness for aeroelasticity testing, perhaps the most important feature being the use of a heavy gas test medium to achieve higher test densities. Higher test medium densities substantially improve model-building requirements and therefore simplify the fabrication process for building aeroelastically scaled wind tunnel models. Aeroelastic scaling for the heavy gas results in lower model structural frequencies. Lower model frequencies tend to a make aeroelastic testing safer. This paper will describe major developments in the testing capabilities at the TDT throughout its history, the current status of the facility, and planned additions and improvements to its capabilities in the near future.
Beran, Michael J; Parrish, Audrey E; Futch, Sara E; Evans, Theodore A; Perdue, Bonnie M
2015-05-01
Human and nonhuman primates are not mentally constrained to the present. They can remember the past and-at least to an extent-anticipate the future. Anticipation of the future ranges from long-term prospection such as planning for retirement to more short-term future-oriented cognition such as planning a route through a maze. Here we tested a great ape species (chimpanzees), an Old World monkey species (rhesus macaques), a New World monkey species (capuchin monkeys), and human children on a computerized maze task. All subjects had to move a cursor through a maze to reach a goal at the bottom of the screen. For best performance on the task, subjects had to "plan ahead" to the end of the maze to move the cursor in the correct direction, avoid traps, and reverse directions if necessary. Mazes varied in difficulty. Chimpanzees were better than both monkey species, and monkeys showed a particular deficit when moving away from the goal or changing directions was required. Children showed a similar pattern to monkeys regarding the effects of reversals and moves away from the goal, but their overall performance in terms of correct maze completion was similar to the chimpanzees. The results highlight similarities as well as differences in planning across species and the role that inhibitory control may play in future-oriented cognition in primates. (c) 2015 APA, all rights reserved).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Awida, Mohamed H.; Passarelli, Donato; Berrutti, Paolo
A total of ten jacketed single-spoke resonators type 1 (SSR1) have been fabricated for Fermilab' injection experiment (PIP2IT). PIP2IT is a test bed for Fermilab's future accelerator named proton improvement plan II that is currently under development. SSR1 cavities operate at 325 MHz to accelerate a proton beam at a relative (to speed of light) velocity (β = 0.22). In this study, we present Fermilab's experience in developing those spoke resonators starting from the design and analysis phase, to fabrication and extensive testing to qualify cavities for cryomodule assembly.
The NASA-Lewis/ERDA solar heating and cooling technology program. [project planning/energy policy
NASA Technical Reports Server (NTRS)
Couch, J. P.; Bloomfield, H. S.
1975-01-01
Plans by NASA to carry out a major role in a solar heating and cooling program are presented. This role would be to create and test the enabling technology for future solar heating, cooling, and combined heating/cooling systems. The major objectives of the project are to achieve reduction in solar energy system costs, while maintaining adequate performance, reliability, life, and maintenance characteristics. The project approach is discussed, and will be accomplished principally by contract with industry to develop advanced components and subsystems. Advanced hardware will be tested to establish 'technology readiness' both under controlled laboratory conditions and under real sun conditions.
Awida, Mohamed H.; Passarelli, Donato; Berrutti, Paolo; ...
2017-08-18
A total of ten jacketed single-spoke resonators type 1 (SSR1) have been fabricated for Fermilab' injection experiment (PIP2IT). PIP2IT is a test bed for Fermilab's future accelerator named proton improvement plan II that is currently under development. SSR1 cavities operate at 325 MHz to accelerate a proton beam at a relative (to speed of light) velocity (β = 0.22). In this study, we present Fermilab's experience in developing those spoke resonators starting from the design and analysis phase, to fabrication and extensive testing to qualify cavities for cryomodule assembly.
The Integrated Airport: Building a Successful NextGen Testbed
DOE Office of Scientific and Technical Information (OSTI.GOV)
Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade
2009-02-18
This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment. NextGen refers to the program that will be initiated to modernize the US National Airspace. As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success. This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation.
Field test results with the targeted search MCSA. [multi-channel spectrum analyzer for SETI
NASA Technical Reports Server (NTRS)
Tarter, J. C.
1988-01-01
In April 1985, a 74,000 channel prototype of the multichannel spectrum analyzer (MCSA) that NASA plans to use in a systematic search for extraterrestrial intelligence (SETI) was installed at DSS13, a 26 meter R&D antenna facility at the Goldstone Deep Space Network (DSN) site. Since that time the instrumentation has been used to validate the performance of signal detection algorithms using locally injected signals and the weak carriers from distant spacecraft. This paper describes results from the Goldstone Field Tests and plans to move the prototype equipment to other sites where SETI may be conducted in the future.
Testing the robustness of management decisions to uncertainty: Everglades restoration scenarios.
Fuller, Michael M; Gross, Louis J; Duke-Sylvester, Scott M; Palmer, Mark
2008-04-01
To effectively manage large natural reserves, resource managers must prepare for future contingencies while balancing the often conflicting priorities of different stakeholders. To deal with these issues, managers routinely employ models to project the response of ecosystems to different scenarios that represent alternative management plans or environmental forecasts. Scenario analysis is often used to rank such alternatives to aid the decision making process. However, model projections are subject to uncertainty in assumptions about model structure, parameter values, environmental inputs, and subcomponent interactions. We introduce an approach for testing the robustness of model-based management decisions to the uncertainty inherent in complex ecological models and their inputs. We use relative assessment to quantify the relative impacts of uncertainty on scenario ranking. To illustrate our approach we consider uncertainty in parameter values and uncertainty in input data, with specific examples drawn from the Florida Everglades restoration project. Our examples focus on two alternative 30-year hydrologic management plans that were ranked according to their overall impacts on wildlife habitat potential. We tested the assumption that varying the parameter settings and inputs of habitat index models does not change the rank order of the hydrologic plans. We compared the average projected index of habitat potential for four endemic species and two wading-bird guilds to rank the plans, accounting for variations in parameter settings and water level inputs associated with hypothetical future climates. Indices of habitat potential were based on projections from spatially explicit models that are closely tied to hydrology. For the American alligator, the rank order of the hydrologic plans was unaffected by substantial variation in model parameters. By contrast, simulated major shifts in water levels led to reversals in the ranks of the hydrologic plans in 24.1-30.6% of the projections for the wading bird guilds and several individual species. By exposing the differential effects of uncertainty, relative assessment can help resource managers assess the robustness of scenario choice in model-based policy decisions.
Strategic Planning for the Air Force. Leveraging Business Planning Insights to Create Future Value
1998-01-01
Strategic Planning for the Air Force Leveraging Business Planning Insights to Create Future Value DEBORAH L. WESTPHAL, RICHARD SZAFRANSKI...SUBTITLE Strategic Planning for the Air Force. Leveraging Business Planning Insights to Create Future Value 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c...can be so, unless leaders and planners are willing to think in the boundary between order and chaos. Long-Range Planning, Strategic Thinking, or
Capacity planning for the future.
Johnson, A M
1997-01-01
Managed care is changing the way health care organizations plan for their futures. Traditional planning takes into account history and geography, while the new approach factors in the impact of managed care of future utilization. The new approach also incorporates strategic planning into an organization's broader strategic plan and budgeting process. The result is a more comprehensive planning method that is critical for health care organization's success.
NASA Engineering and Safety Center (NESC) Enhanced Melamine (ML) Foam Acoustic Test (NEMFAT)
NASA Technical Reports Server (NTRS)
McNelis, Anne M.; Hughes, William O.; McNelis, Mark E.
2014-01-01
The NASA Engineering and Safety Center (NESC) funded a proposal to achieve initial basic acoustic characterization of ML (melamine) foam, which could serve as a starting point for a future, more comprehensive acoustic test program for ML foam. A project plan was developed and implemented to obtain acoustic test data for both normal and enhanced ML foam. This project became known as the NESC Enhanced Melamine Foam Acoustic Test (NEMFAT). This document contains the outcome of the NEMFAT project.
Autonomous Planetary Rover at Carnegie Mellon
1991-08-01
preplanned motions to test the limits of the Ambler’s mobility. This has included stepping down the sheer face of a meter high rock into a meter deep trench...NASA or the planning in the face of uncertainties and conflicting constraints. US Government. and coordinating a distributed software system. Future...planning process. 0 Calculate the’minimum Ambler height s. -,e body or A sequence of point-turn to face the goal, move in a sweeping legs just contacb
Bullet Impact Safety Study of PBX-9502
NASA Astrophysics Data System (ADS)
Ferranti, Louis
2013-06-01
A new small arms capability for performing bullet impact testing into energetic materials has recently been activated at Lawrence Livermore National Laboratory located in the High Explosives Applications Facility (HEAF). The initial capability includes 0.223, 0.30, and 0.50 testing calibers with the flexibility to add other barrels in the near future. An initial test series has been performed using the 0.50 caliber barrel shooting bullets into targets using the TATB based explosive PBX-9502 and shows an expected non-violent reaction. Future experiments to evaluate the safety of new explosive formulations to bullet impact are planned. A highlight of the new capability along with discussion of the initial experiments to date will be presented including future areas of research. This work performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344.
Near-field measurement facility plans at Lewis Research Center
NASA Technical Reports Server (NTRS)
Sharp, R. G.
1983-01-01
The direction of future antenna technology will be toward antennas which are large, both physically and electrically, will operate at frequencies up to 60 GHz, and are non-reciprocal and complex, implementing multiple-beam and scanning beam concepts and monolithic semiconductor devices and techniques. The acquisition of accurate antenna performance measurements is a critical part of the advanced antenna research program and represents a substantial antenna measurement technology challenge, considering the special characteristics of future spacecraft communications antennas. Comparison of various antenna testing techniques and their relative advantages and disadvantages shows that the near-field approach is necessary to meet immediate and long-term testing requirements. The LeRC facilities, the 22 ft x 22 ft horizontal antenna boresight planar scanner and the 60 ft x 60 ft vertical antenna boresight plant scanner (with a 60 GHz frequency and D/lamdba = 3000 electrical size capabilities), will meet future program testing requirements.
Maritime transport in the Gulf of Bothnia 2030.
Pekkarinen, Annukka; Repka, Sari
2014-10-01
Scenarios for shipping traffic in the Gulf of Bothnia (GoB) by 2030 are described in order to identify the main factors that should be taken into account when preparing a Maritime Spatial Plan (MSP) for the area. The application of future research methodology to planning of marine areas was also assessed. The methods include applying existing large scale quantitative scenarios for maritime traffic in the GoB and using real-time Delphi in which an expert group discussed different factors contributing to future maritime traffic in the GoB to find out the probability and significance of the factors having an impact on maritime traffic. MSP was tested on transnational scale in the Bothnian sea area as a pilot project.
DOT National Transportation Integrated Search
2016-07-01
The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program is part of a national effort to advance CV technologies by deploying, demonstrating, testing and offering lessons learned for future deployers. The THE...
NASA Astrophysics Data System (ADS)
Salmi, Hannu; Thuneberg, Helena; Vainikainen, Mari-Pauliina
2016-11-01
Outreach activities, like mobile science exhibitions, give opportunities to hands-on experiences in an attractive learning environment. We analysed attitudes, motivation and learning during a science exhibition visit, their relations to gender and future educational plans in Finland, Estonia, Latvia and Belgium (N = 1210 sixth-graders). Pupils' performance in a knowledge test improved after the visit. Autonomous motivation and attitudes towards science predicted situation motivation awakened in the science exhibition. Interestingly, the scientist attitude and the societal attitude were clearly separate dimensions. The third dimension was manifested in the engineering attitude typical for boys, who were keener on working with appliances, designing computer games and animations. Scientist and societal attitudes correlated positively and engineering attitude correlated negatively with the future educational plans of choosing the academic track in secondary education. The societal perspective on science was connected to above average achievement. In the follow-up test, these attitudes showed to be quite stable.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cowee, Misa; Liu, Kaijun; Friedel, Reinhard H.
2012-07-17
We summarize the scientific problem and work plan for the LANL LDRD-funded project to use a test particle code to study the sudden de-trapping of inner belt protons and possible cross-L transport of debris ions after a high altitude nuclear explosion (HANE). We also discuss future application of the code for other HANE-related problems.
CSTT Update: Fuel Quality Analyzer
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brosha, Eric L.; Lujan, Roger W.; Mukundan, Rangachary
These are slides from a presentation. The following topics are covered: project background (scope and approach), developing the prototype (timeline), update on intellectual property, analyzer comparisons (improving humidification, stabilizing the baseline, applying clean-up strategy, impact of ionomer content and improving clean-up), proposed operating mode, considerations for testing in real-world conditions (Gen 1 analyzer electronics development, testing partner identified, field trial planning), summary, and future work.
Real-time flight test data distribution and display
NASA Technical Reports Server (NTRS)
Nesel, Michael C.; Hammons, Kevin R.
1988-01-01
Enhancements to the real-time processing and display systems of the NASA Western Aeronautical Test Range are described. Display processing has been moved out of the telemetry and radar acquisition processing systems super-minicomputers into user/client interactive graphic workstations. Real-time data is provided to the workstations by way of Ethernet. Future enhancement plans include use of fiber optic cable to replace the Ethernet.
Development of High Temperature SiC Based Hydrogen/Hydrocarbon Sensors with Bond Pads for Packaging
NASA Technical Reports Server (NTRS)
Xu, Jennifer C.; Hunter, Gary W.; Chen, Liangyu; Biagi-Labiosa, Azlin M.; Ward, Benjamin J.; Lukco, Dorothy; Gonzalez, Jose M., III; Lampard, Peter S.; Artale, Michael A.; Hampton, Christopher L.
2011-01-01
This paper describes efforts towards the transition of existing high temperature hydrogen and hydrocarbon Schottky diode sensor elements to packaged sensor structures that can be integrated into a testing system. Sensor modifications and the technical challenges involved are discussed. Testing of the sensors at 500 C or above is also presented along with plans for future development.
Barz, Milena; Lange, Daniela; Parschau, Linda; Lonsdale, Chris; Knoll, Nina; Schwarzer, Ralf
2016-01-01
Planning can bridge the gap between intentions and action, but what bridges the gap between planning and action? This study helps to answer the question by disentangling the interrelationships between self-efficacy, planning and preparatory behaviours in predicting physical activity. Preparatory behaviours are tested as a working mechanism of planning. Moreover, it is tested whether the utility of preparatory behaviours depends on an individual's level of self-efficacy. A survey assessed planning, self-efficacy and preparatory behaviours for physical activity. Adults (N = 166) provided data at two measurement points. In a longitudinal model, preparatory behaviours were specified as a mediator between planning and physical activity. Self-efficacy was specified as a possible moderator at two points in the model. Preparatory behaviours mediated the relationship between planning and physical activity. An interaction between self-efficacy and preparatory behaviours on physical activity was found, indicating that individuals with low self-efficacy beliefs were more active if they engaged more frequently in preparatory behaviours. Planning seems to stimulate preparatory behaviours, which in turn make future physical activity more likely. Furthermore, as performing preparatory behaviours represent a step forward towards the enactment of behavioural goals, preparatory behaviours may be particular beneficial for individuals afflicted by self-doubts regarding physical activity.
Mystic mountain: an educational alternative futures wildland planning game
Edward C. Thor; James L. Creighton
1978-01-01
Alternative futures planning is a generic name for a number of planning approaches which recognize that the future is uncertain. There is not one future, preordained and universally known, but rather a variety of possible futures, any one of which may occur. Mystic Mountain is an educational game which teaches wildland planners and managers important concepts in...
Systematic testing of flood adaptation options in urban areas through simulations
NASA Astrophysics Data System (ADS)
Löwe, Roland; Urich, Christian; Sto. Domingo, Nina; Mark, Ole; Deletic, Ana; Arnbjerg-Nielsen, Karsten
2016-04-01
While models can quantify flood risk in great detail, the results are subject to a number of deep uncertainties. Climate dependent drivers such as sea level and rainfall intensities, population growth and economic development all have a strong influence on future flood risk, but future developments can only be estimated coarsely. In such a situation, robust decision making frameworks call for the systematic evaluation of mitigation measures against ensembles of potential futures. We have coupled the urban development software DAnCE4Water and the 1D-2D hydraulic simulation package MIKE FLOOD to create a framework that allows for such systematic evaluations, considering mitigation measures under a variety of climate futures and urban development scenarios. A wide spectrum of mitigation measures can be considered in this setup, ranging from structural measures such as modifications of the sewer network over local retention of rainwater and the modification of surface flow paths to policy measures such as restrictions on urban development in flood prone areas or master plans that encourage compact development. The setup was tested in a 300 ha residential catchment in Melbourne, Australia. The results clearly demonstrate the importance of considering a range of potential futures in the planning process. For example, local rainwater retention measures strongly reduce flood risk a scenario with moderate increase of rain intensities and moderate urban growth, but their performance strongly varies, yielding very little improvement in situations with pronounced climate change. The systematic testing of adaptation measures further allows for the identification of so-called adaptation tipping points, i.e. levels for the drivers of flood risk where the desired level of flood risk is exceeded despite the implementation of (a combination of) mitigation measures. Assuming a range of development rates for the drivers of flood risk, such tipping points can be translated into anticipated time spans over which a measure will be effective. While the new simulation setup is limited to situations where the planner is able to define realistic ranges for the development of drivers of flood risk, it certainly contributes to an improved consideration of deep uncertainties in the planning process. Future work will particularly focus on the application of the framework in a variety of urban development contexts.
Crowther, Martha R; Huang, Chao-Hui Sylvia; Allen, Rebecca S
2015-01-01
This exploratory study examined the context and consequences of custodial grandparenting, along with attitudes and preferences regarding future planning among 22 African-American custodial grandmothers. A mixed-method research design was employed. Based on our integration of two theories regarding future planning and health behavior change, caregiving, emotional distress, religiosity and spirituality, and future planning were assessed using questionnaires along with semi-structured interviews. African-American custodial grandmothers (mean age M = 53.64, SD = 9.58) perceived their caregiving role as rewarding (72%) yet challenging (86%). More than 40% reported significant emotional distress (CES-D ≥ 16) that warrants clinical attention. Findings showed that while 64% of study participants had future plans regarding who will substitute in their caregiving role if they become incapacitated, only 9% had completed a living will. Three major themes emerged regarding custodial grandmothers' caregiving role which includes: (1) rewards; (2) challenges including feeling overwhelmed and health concerns; and (3) caregiving decisions including conflicts between 'My plan was…/put self on-hold' for grandchildren and difficulty with future planning. These themes highlighted the dynamics of caregiving across time, including current context and the ongoing process of decision-making. Findings suggest that while African-American custodial grandmothers find caregiving rewarding, they face unique challenges in contemplating and developing future plans. Custodial grandmothers think about substitute caregivers for their grandchildren but need assistance communicating a plan focused on their own needs for future care. Culturally sensitive interventions designed to facilitate effective utilization of future plans within this caregiver population are needed.
Beyond scenario planning: projecting the future using models at Wind Cave National Park (USA)
NASA Astrophysics Data System (ADS)
King, D. A.; Bachelet, D. M.; Symstad, A. J.
2011-12-01
Scenario planning has been used by the National Park Service as a tool for natural resource management planning in the face of climate change. Sets of plausible but divergent future scenarios are constructed from available information and expert opinion and serve as starting point to derive climate-smart management strategies. However, qualitative hypotheses about how systems would react to a particular set of conditions assumed from coarse scale climate projections may lack the scientific rigor expected from a federal agency. In an effort to better assess the range of likely futures at Wind Cave National Park, a project was conceived to 1) generate high resolution historic and future climate time series to identify local weather patterns that may or may not persist, 2) simulate the hydrological cycle in this geologically varied landscape and its response to future climate, 3) project vegetation dynamics and ensuing changes in the biogeochemical cycles given grazing and fire disturbances under new climate conditions, and 4) synthesize and compare results with those from the scenario planning exercise. In this framework, we tested a dynamic global vegetation model against local information on vegetation cover, disturbance history and stream flow to better understand the potential resilience of these ecosystems to climate change. We discuss the tradeoffs between a coarse scale application of the model showing regional trends with limited ability to project the fine scale mosaic of vegetation at Wind Cave, and a finer scale approach that can account for local slope effects on water balance and better assess the vulnerability of landscape facets, but requires more intensive data acquisition. We elaborate on the potential for sharing information between models to mitigate the often-limited treatment of biological feedbacks in the physical representations of soil and atmospheric processes.
Veggies in Space: Salad Crop Production on the ISS
NASA Technical Reports Server (NTRS)
Massa, Gioia
2016-01-01
NASA is currently testing Veggie, a low mass, low energy, salad crop production system on the International Space Station (ISS). Veggie grows crops with LED lights using ISS cabin air and passive watering that has presented challenges in microgravity. Initial tests included red romaine lettuce and zinnia, with testing of Chinese cabbage, and tomatoes planned. A goal is to add supplemental salad foods to the astronaut diet as we prepare for a future journey to Mars.
Development and flight testing of UV optimized Photon Counting CCDs
NASA Astrophysics Data System (ADS)
Hamden, Erika T.
2018-06-01
I will discuss the latest results from the Hamden UV/Vis Detector Lab and our ongoing work using a UV optimized EMCCD in flight. Our lab is currently testing efficiency and performance of delta-doped, anti-reflection coated EMCCDs, in collaboration with JPL. The lab has been set-up to test quantum efficiency, dark current, clock-induced-charge, and read noise. I will describe our improvements to our circuit boards for lower noise, updates from a new, more flexible NUVU controller, and the integration of an EMCCD in the FIREBall-2 UV spectrograph. I will also briefly describe future plans to conduct radiation testing on delta-doped EMCCDs (both warm, unbiased and cold, biased configurations) thus summer and longer term plans for testing newer photon counting CCDs as I move the HUVD Lab to the University of Arizona in the Fall of 2018.
Test Plan for the Technology Maturation of Supersonic Inflatable Aerodynamic Decelerators
NASA Technical Reports Server (NTRS)
Kelly, Jenny R.; Cruz, Juan R.
2009-01-01
Supersonic inflatable aerodynamic decelerators (IADs) are drag devices intended to be deployed at high Mach numbers. In the application considered here they assist in the descent and landing of spacecraft on Mars. Although promising, present IAD technology is not yet sufficiently mature for use in the near future. This paper describes a technology maturation plan for tension cone IADs using subscale test articles to reduce development costs. As envisioned, the proposed test plan includes three phases: wind tunnel tests (subsonic), unpowered high-altitude flight tests (transonic), and powered high-altitude tests (supersonic). This test plan is based on a building block approach in which successful completion of each phase adds to the understanding of the behavior of IADs and reduces the risk of the subsequent, more expensive phases. By properly scaling the IADs, test articles of the same size and nearly the same construction can be used for all three phases. The final phase is a dynamically scaled flight test with IAD deployment at the same Mach number as the full-scale vehicle on Mars. Two full-scale example cases are presented: one for a single-stage system (15 m dia. IAD to subsonic retropropulsion), and another for a two-stage system (10.5 m dia. IAD to subsonic parachute). Using scale factors of 0.333 and 0.476 yield subscale test IADs of 5 m dia. The dynamically scaled powered flight test starts at Mach 4 and an altitude of 33.5 km. Existing balloons and rocket motors are shown to be adequate to meet the required test conditions.
A Long-Range Approach to Instructional Leadership.
ERIC Educational Resources Information Center
McDermott, Donald F.
1984-01-01
In Anchorage, Alaska, aspiring principals are getting on-the-job experience through a two-year intern program that facilitates long range planning by enabling the district to test and mold its future administrators. Interns serve as administrative assistants, troubleshooters, and participates in instructional supervision and policy decision. (TE)
Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moe, Wayne; Honma, George
This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical informationmore » is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.« less
Highlights of Astronomy, Vol. 16
NASA Astrophysics Data System (ADS)
Montmerle, Thierry
2015-04-01
Part I. Invited Discourses: 1. The Herschel view of star formation; 2. Past, present and future of Chinese astronomy; 3. The zoo of galaxies; 4. Supernovae, the accelerating cosmos, and dark energy; Part II. Joint Discussion: 5. Very massive stars in the local universe; 6. 3-D views of the cycling Sun in stellar context; 7. Ultraviolet emission in early-type galaxies; 8. From meteors and meteorites to their parent bodies: current status and future developments; 9. The connection between radio properties and high-energy emission in AGNs; 10. Space-time reference systems for future research; Part III. Special Sessions: 11. Origin and complexity of massive star clusters; 12. Cosmic evolution of groups and clusters of galaxies; 13. Galaxy evolution through secular processes; 14. New era for studying interstellar and intergalactic magnetic fields; 15. The IR view of massive stars: the main sequence and beyond; 16. Science with large solar telescopes; 17. The impact hazard: current activities and future plans; 18. Calibration of star-formation rate measurements across the electromagnetic spectrum; 19. Future large scale facilities; 20. Dynamics of the star-planet relations strategic plan and the Global Office of Astronomy for Development; 21. Strategic plan and the Global Office of Astronomy for Development; 22. Modern views of the interstellar medium; 23. High-precision tests of stellar physics from high-precision photometry; 24. Communicating astronomy with the public for scientists; 25. Data intensive astronomy; 26. Unexplained spectral phenomena in the interstellar medium; 27. Light pollution: protecting astronomical sites and increasing global awareness through education.
Life-finding detector development at NASA GSFC using a custom H4RG test bed
NASA Astrophysics Data System (ADS)
Mosby, Gregory; Rauscher, Bernard; Kutyrev, Alexander
2018-01-01
Chemical species associated with life, called biosignatures, should be visible in exoplanet atmospheres with larger space telescopes. These signals will be faint and require very low noise (~e-) detectors to robustly measure. At NASA Goddard we are developing a single detector H4RG test bed to characterize and identify potential technology developments needed for the next generation's large space telescopes. The vacuum and cryogenic test bed will include near infrared light sources from integrating spheres using a motorized shutter. The detector control and readout will be handled by a Leach controller. Detector cables have been manufactured and test planning has begun. Planned tests include testing minimum read noise capabilities, persistence mitigation strategies using long wavelength light, and measuring intrapixel variation which might affect science goals of future missions. In addition to providing a means to identify areas of improvement in detector technology, we hope to use this test bed to probe some fundamental physics of these infrared arrays.
Integrated test plan for directional boring
DOE Office of Scientific and Technical Information (OSTI.GOV)
Volk, B.W.
This integrated test plan describes the field testing of the DITCH WITCH Directional Boring System. DITCH WITCH is a registered trademark of The Charles Machine Works, Inc., Perry, Oklahoma. The test is being conducted as a coordinated effort between Charles Machine Works (CMW), Sandia National Laboratories (SNL), and the Westinghouse Hanford Company (WHC). Funding for the WHC portion of the project is through the Volatile Organic Compound-Arid Integrated Demonstration (VOC-Arid ID). The purpose of the test is to evaluate the performance of the directional boring system for possible future use on environmental restoration projects at Hanford and other Department ofmore » Energy (DOE) sites. The test will be conducted near the 200 Areas Fire Station located between the 200 East and 200 West Area of the Hanford Site. The directional boring system will be used to drill and complete (with fiberglass casing) two horizontal boreholes. A third borehole will be drilled to test sampling equipment but will not be completed with casing.« less
Dean, Marleah; Rauscher, Emily A
2017-12-01
Women who test positive for a BRCA genetic mutation are at an increased risk for developing hereditary breast and ovarian cancer and have a 50% chance of passing on their genetic mutation to their children. The purpose of this study was to investigate how women who test positive for a BRCA mutation but have not been diagnosed with cancer make decisions regarding family planning. Analysis of interviews with 20 women revealed they engage in logical and emotional decision-making styles. Although women want to be logical to reduce their hereditary cancer risk, emotions often complicate their decision-making. Women experience fear and worry about a future cancer diagnosis, yet also desire to create a family, particularly having children through natural conception. That is, women negotiate having preventative surgeries in a logical doctor-recommended timeframe but also organize those decisions around emotional desires of motherhood. Overall, this study demonstrates the complex decisions women who test positive for a BRCA mutation must make in regards to genetic testing timing, family planning, and overall quality of life.
NASA Astrophysics Data System (ADS)
Petrachenko, Bill; Behrend, Dirk; Gipson, John; Hase, Hayo; Ma, Chopo; MacMillan, Dan; Niell, Arthur; Nothnagel, Axel; Zhang, Xiuzhong
2014-12-01
Over the past several years, the VGOS broadband system has been under development; it is currently undergoing advanced testing. At the same time, commitments were made for a number of antenna projects with as many as 30 stations expected for VGOS observing by 2019. In order to focus activities into the future, a proposal was made by the VPEG for an observing plan with the long term goal of guiding the transition from S/X operations to VGOS operations. The plan anticipates that by the end of 2014 as many as eight antennas will be capable of broadband observing. These antennas will participate in a series of test campaigns during 2015 followed by a VGOS pilot project throughout 2016. Full operations with as many as 16 stations are expected to begin in 2017. The observing plan places a priority on early improvement in the quality of daily products. As a result, the pilot project involves a single weekly 24-hour session with reduced duty cycle sessions on each of the remaining days of the week. Correlator and data transmission requirements for the plan are currently being assessed.
Apes produce tools for future use.
Bräuer, Juliane; Call, Josep
2015-03-01
There is now growing evidence that some animal species are able to plan for the future. For example great apes save and exchange tools for future use. Here we raise the question whether chimpanzees, orangutans, and bonobos would produce tools for future use. Subjects only had access to a baited apparatus for a limited duration and therefore should use the time preceding this access to create the appropriate tools in order to get the rewards. The apes were tested in three conditions depending on the need for pre-prepared tools. Either eight tools, one tool or no tools were needed to retrieve the reward. The apes prepared tools in advance for future use and they produced them mainly in conditions when they were really needed. The fact that apes were able to solve this new task indicates that their planning skills are flexible. However, for the condition in which eight tools were needed, apes produced less than two tools per trial in advance. However, they used their chance to produce additional tools in the tool use phase-thus often obtaining most of the reward from the apparatus. Increased pressure to prepare more tools in advance did not have an effect on their performance. © 2014 Wiley Periodicals, Inc.
Technology Against Terrorism: The Federal Effort
1991-07-01
control appli - control and airport security plans. Some difficulties cations, irises of those seeking entry would be have arisen: now that specific...Washington International Air- tion. Among more advanced technologies are four of port as a test-bed. Sandia is applying to airport interest: voice...and 300 by 1999. criteria as well as evaluation standards and proce- In further tests carried out at JFK Airport in New dures for future EDS devices
Baseline Testing of the Hybrid Electric Transit Bus
NASA Technical Reports Server (NTRS)
Brown, Jeffrey C.; Eichenberg, Dennis J.; Thompson, William K.
1999-01-01
A government, industry and academic cooperative has developed a Hybrid Electric Transit Bus (HETB). Goals of the program include doubling the fuel economy of city transit buses currently in service, and reducing emissions to one-tenth of EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors for the energy storage system and the planned use of a natural gas fueled turbogenerator, to be developed from a small jet engine. At over 17000 kg gross weight, this is the largest vehicle to use ultra-capacitor energy storage. A description of the HETB, the results of performance testing, and future vehicle development plans are the subject of this report.
Numerical aerodynamic simulation program long haul communications prototype
NASA Technical Reports Server (NTRS)
Cmaylo, Bohden K.; Foo, Lee
1987-01-01
This document is a report of the Numerical Aerodynamic Simulation (NAS) Long Haul Communications Prototype (LHCP). It describes the accomplishments of the LHCP group, presents the results from all LHCP experiments and testing activities, makes recommendations for present and future LHCP activities, and evaluates the remote workstation accesses from Langley Research Center, Lewis Research Center, and Colorado State University to Ames Research Center. The report is the final effort of the Long Haul (Wideband) Communications Prototype Plan (PT-1133-02-N00), 3 October 1985, which defined the requirements for the development, test, and operation of the LHCP network and was the plan used to evaluate the remote user bandwidth requirements for the Numerical Aerodynamic Simulation Processing System Network.
The Integrated Airport: Building a Successful NextGen Testbed
Frederick-Recascino, Christina; Sweigard, Doug; Lester, Wade
2018-01-24
This presentation will describe a unique public-private partnership - the Integrated Airport - that was created to engage in research and testing related to NextGen Technology deployment. NextGen refers to the program that will be initiated to modernize the US National Airspace. As with any major, multi-decade initiative, such as NextGen, integration of work efforts by multiple partners in the modernization is critical for success. This talk will focus on the development of the consortium, how the consortium plans for NextGen initiatives, the series of technology demonstrations we have produced and plans for the future of NextGen testing and implementation.Â
Integration Testing of Space Flight Systems
NASA Technical Reports Server (NTRS)
Honeycutt, Timothy; Sowards, Stephanie
2008-01-01
Based on the previous success' of Multi-Element Integration Testing (MEITs) for the International Space Station Program, these type of integrated tests have also been planned for the Constellation Program: MEIT (1) CEV to ISS (emulated) (2) CEV to Lunar Lander/EDS (emulated) (3) Future: Lunar Surface Systems and Mars Missions Finite Element Integration Test (FEIT) (1) CEV/CLV (2) Lunar Lander/EDS/CaL V Integrated Verification Tests (IVT) (1) Performed as a subset of the FEITs during the flight tests and then performed for every flight after Full Operational Capability (FOC) has been obtained with the flight and ground Systems.
NASA Technical Reports Server (NTRS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.;
2016-01-01
NASA's James Webb Space Telescope (JWST) is a 6.6m diameter, segmented, deployable telescope for cryogenic IR space astronomy (40K). The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM) that contains four science instruments (SI) and the fine guider. The SIs are mounted to a composite metering structure. The SI and guider units were integrated to the ISIM structure and optically tested at the NASA Goddard Space Flight Center as a suite using the Optical Telescope Element SIMulator (OSIM). OSIM is a full field, cryogenic JWST telescope simulator. SI performance, including alignment and wave front error, were evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
NASA Astrophysics Data System (ADS)
Antonille, Scott R.; Miskey, Cherie L.; Ohl, Raymond G.; Rohrbach, Scott O.; Aronstein, David L.; Bartoszyk, Andrew E.; Bowers, Charles W.; Cofie, Emmanuel; Collins, Nicholas R.; Comber, Brian J.; Eichhorn, William L.; Glasse, Alistair C.; Gracey, Renee; Hartig, George F.; Howard, Joseph M.; Kelly, Douglas M.; Kimble, Randy A.; Kirk, Jeffrey R.; Kubalak, David A.; Landsman, Wayne B.; Lindler, Don J.; Malumuth, Eliot M.; Maszkiewicz, Michael; Rieke, Marcia J.; Rowlands, Neil; Sabatke, Derek S.; Smith, Corbett T.; Smith, J. Scott; Sullivan, Joseph F.; Telfer, Randal C.; Te Plate, Maurice; Vila, M. Begoña.; Warner, Gerry D.; Wright, David; Wright, Raymond H.; Zhou, Julia; Zielinski, Thomas P.
2016-09-01
NASA's James Webb Space Telescope (JWST) is a 6.5m diameter, segmented, deployable telescope for cryogenic IR space astronomy. The JWST Observatory includes the Optical Telescope Element (OTE) and the Integrated Science Instrument Module (ISIM), that contains four science instruments (SI) and the Fine Guidance Sensor (FGS). The SIs are mounted to a composite metering structure. The SIs and FGS were integrated to the ISIM structure and optically tested at NASA's Goddard Space Flight Center using the Optical Telescope Element SIMulator (OSIM). OSIM is a full-field, cryogenic JWST telescope simulator. SI performance, including alignment and wavefront error, was evaluated using OSIM. We describe test and analysis methods for optical performance verification of the ISIM Element, with an emphasis on the processes used to plan and execute the test. The complexity of ISIM and OSIM drove us to develop a software tool for test planning that allows for configuration control of observations, implementation of associated scripts, and management of hardware and software limits and constraints, as well as tools for rapid data evaluation, and flexible re-planning in response to the unexpected. As examples of our test and analysis approach, we discuss how factors such as the ground test thermal environment are compensated in alignment. We describe how these innovative methods for test planning and execution and post-test analysis were instrumental in the verification program for the ISIM element, with enough information to allow the reader to consider these innovations and lessons learned in this successful effort in their future testing for other programs.
The Theory of Planned Behavior as a Model of Heavy Episodic Drinking Among College Students
Collins, Susan E.; Carey, Kate B.
2008-01-01
This study provided a simultaneous, confirmatory test of the theory of planned behavior (TPB) in predicting heavy episodic drinking (HED) among college students. It was hypothesized that past HED, drinking attitudes, subjective norms and drinking refusal self-efficacy would predict intention, which would in turn predict future HED. Participants consisted of 131 college drinkers (63% female) who reported having engaged in HED in the previous two weeks. Participants were recruited and completed questionnaires within the context of a larger intervention study (see Collins & Carey, 2005). Latent factor structural equation modeling was used to test the ability of the TPB to predict HED. Chi-square tests and fit indices indicated good fit for the final structural models. Self-efficacy and attitudes but not subjective norms significantly predicted baseline intention, and intention and past HED predicted future HED. Contrary to hypotheses, however, a structural model excluding past HED provided a better fit than a model including it. Although further studies must be conducted before a definitive conclusion is reached, a TPB model excluding past behavior, which is arguably more parsimonious and theory driven, may provide better prediction of HED among college drinkers than a model including past behavior. PMID:18072832
A space crane concept for performing on-orbit assembly
NASA Technical Reports Server (NTRS)
Dorsey, John T.
1992-01-01
The topics are presented in viewgraph form and include: in-space assembly and construction enhances future mission planning flexibility; in-space assembly and construction facility concept; space crane concept with mobile base; fundamental characteristics; space crane research approach; spacecraft component positioning and assembly test-bed; and articulating joint testbed.
Studies of future management and policy options based on different assumptions provide a mechanism to examine possible outcomes and especially their likely benefits or consequences. Planning and assessment in land and water resource management are evolving toward complex, spatia...
Assessing Potential Predisposition of Elementary School Children to Heart Disease.
ERIC Educational Resources Information Center
Crow, Thomas A.; And Others
1982-01-01
A health assessment battery was developed to screen elementary school children in Clovis (California) for factors that might lead to heart disease. Students' height, blood pressure, flexibility, weight, and body fatness (by skin-fold tests) were measured. Plans call for future development of longitudinal student profiles. (Authors/PP)
DOT National Transportation Integrated Search
1993-06-01
The safety of magnetically levitated (maglev) and high speed rail (HSR) trains proposed for application in the United States is the responsibility of the Federal Railroad Administration (FRA). Plans for near future US applications include maglev proj...
Space transportation system flight 2 OSTA-1 scientific payload data management plan
NASA Technical Reports Server (NTRS)
1981-01-01
The Shuttle Imaging Radar-A (SIR-A), Shuttle Multispectral Infrared Radiometer (SMIRR), Future Identification and Location Experiment (FILE), Measurement of Air Pollution from Satellites (MAPS), Ocean Color Experiment (OCE), the Night/Day Optical Survey of Lightning (NOSL), and the Heflex Bioengineering Test (HBT) experiments are described.
Vulnerability-based evaluation of water supply design under climate change
NASA Astrophysics Data System (ADS)
Umit Taner, Mehmet; Ray, Patrick; Brown, Casey
2015-04-01
Long-lived water supply infrastructures are strategic investments in the developing world, serving the purpose of balancing water deficits compounded by both population growth and socio-economic development. Robust infrastructure design under climate change is compelling, and often addressed by focusing on the outcomes of climate model projections ('scenario-led' planning), or by identifying design options that are less vulnerable to a wide range of plausible futures ('vulnerability-based' planning). Decision-Scaling framework combines these two approaches by first applying a climate stress test on the system to explore vulnerabilities across many traces of the future, and then employing climate projections to inform the decision-making process. In this work, we develop decision scaling's nascent risk management concepts further, directing actions on vulnerabilities identified during the climate stress test. In the process, we present a new way to inform climate vulnerability space using climate projections, and demonstrate the use of multiple decision criteria to guide to a final design recommendation. The concepts are demonstrated for a water supply project in the Mombasa Province of Kenya, planned to provide domestic and irrigation supply. Six storage design capacities (from 40 to 140 million cubic meters) are explored through a stress test, under a large number climate traces representing both natural climate variability and plausible climate changes. Design outcomes are simulated over a 40-year planning period with a coupled hydrologic-water resources systems model and using standard reservoir operation rules. Resulting performance is expressed in terms of water supply reliability and economic efficiency. Ensemble climate projections are used for assigning conditional likelihoods to the climate traces using a statistical distance measure. The final design recommendations are presented and discussed for the decision criteria of expected regret, satisficing, and conditional value-at-risk (CVaR).
Comprehensive Nuclear-Test-Ban Treaty: Background and Current Developments
2010-12-07
there are no plans to do so.’”4 Critics expressed concern about the implications of these policies for testing and new weapons. Physicians for...design and build new nuclear weapons, and abandon a ten-year-old moratorium on nuclear weapons testing.”5 Another critic felt that increased funding for...guarantees regarding the voluntary moratorium. We may find at some future time that we cannot diagnose or remedy a problem in a warhead critical the U.S
NASA Technical Reports Server (NTRS)
Szuch, J. R.; Soeder, J. F.; Seldner, K.; Cwynar, D. S.
1977-01-01
The design, evaluation, and testing of a practical, multivariable, linear quadratic regulator control for the F100 turbofan engine were accomplished. NASA evaluation of the multivariable control logic and implementation are covered. The evaluation utilized a real time, hybrid computer simulation of the engine. Results of the evaluation are presented, and recommendations concerning future engine testing of the control are made. Results indicated that the engine testing of the control should be conducted as planned.
Transceiver for Space Station Freedom
NASA Technical Reports Server (NTRS)
Fitzmaurice, M.; Bruno, R.
1990-01-01
This paper describes the design of the Laser Communication Transceiver (LCT) system which was planned to be flight tested as an attached payload on Space Station Freedom. The objective in building and flight-testing the LCT is to perform a broad class of tests addressing the critical aspects of space-based optical communications systems, providing a base of experience for applying laser communications technology toward future communications needs. The LCT's functional and performance requirements and capabilities with respect to acquisition, spatial tracking and pointing, communications, and attitude determination are discussed.
Transceiver for Space Station Freedom
NASA Astrophysics Data System (ADS)
Fitzmaurice, M.; Bruno, R.
1990-07-01
This paper describes the design of the Laser Communication Transceiver (LCT) system which was planned to be flight tested as an attached payload on Space Station Freedom. The objective in building and flight-testing the LCT is to perform a broad class of tests addressing the critical aspects of space-based optical communications systems, providing a base of experience for applying laser communications technology toward future communications needs. The LCT's functional and performance requirements and capabilities with respect to acquisition, spatial tracking and pointing, communications, and attitude determination are discussed.
Planning for the Future of Your Child with a Disabliity. Second Edition.
ERIC Educational Resources Information Center
O'Leary, Edward, Ed.; Trotter, Susan, Ed.
The handbook provides parents of children with disabilities guidance on planning for the child's future needs with special attention to resources and laws of Iowa. Section 1 gives a Future Planning Checklist and definitions of common legal terms. Section 2 addresses estates, trusts, and wills and provides common estate planning questions and…
NASA Technical Reports Server (NTRS)
Pass, Ralph P.
1988-01-01
Recently, the United States has increased its activities related to aircraft icing in numerous fields: ice phobics, revised characterization of icing conditions, instrument development/evaluation, de-ice/anti-ice devices, simulated supercooled clouds, computer simulation and flight tests. The Federal Coordinator for Meteorology is involved in two efforts, one a National Plan on Aircraft Icing and the other a plan for Improved Aircraft Icing Forecasts and Associated Warning Services. These two plans will provide an approved structure for future U.S. activities related to aircraft icing. The recommended activities will significantly improve the position of government agencies to perform mandated activities and to enable U.S. manufacturers to be competitive in the world market.
NASA Technical Reports Server (NTRS)
Jani, Yashvant
1992-01-01
As part of the RICIS activity, the reinforcement learning techniques developed at Ames Research Center are being applied to proximity and docking operations using the Shuttle and Solar Max satellite simulation. This activity is carried out in the software technology laboratory utilizing the Orbital Operations Simulator (OOS). This report is deliverable D2 Altitude Control Results and provides the status of the project after four months of activities and outlines the future plans. In section 2 we describe the Fuzzy-Learner system for the attitude control functions. In section 3, we provide the description of test cases and results in a chronological order. In section 4, we have summarized our results and conclusions. Our future plans and recommendations are provided in section 5.
NASA Technical Reports Server (NTRS)
Remer, Donald S.; Sherif, Josef; Buchanan, Harry R.
1993-01-01
This paper develops a cost model to do long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The paper focuses on the costs required to modify and/or enhance the DSN to prepare for future space missions. The model is a function of eight major mission cost drivers and estimates both the total cost and the annual costs of a similar future space mission. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. Estimates derived from the model are tested against actual cost data for two independent missions, Viking and Mariner Jupiter/Saturn (MJS).
NASA Technical Reports Server (NTRS)
Sallee, G. P.
1973-01-01
The advanced technology requirements for an advanced high speed commercial transport engine are presented. The results of the phase 3 effort cover the requirements and objectives for future aircraft propulsion systems. These requirements reflect the results of the Task 1 and 2 efforts and serve as a baseline for future evaluations, specification development efforts, contract/purchase agreements, and operational plans for future subsonic commercial engines. This report is divided into five major sections: (1) management objectives for commercial propulsion systems, (2) performance requirements for commercial transport propulsion systems, (3) design criteria for future transport engines, (4) design requirements for powerplant packages, and (5) testing.
Design Flexibility for Uncertain Distributed Generation from Photovoltaics
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palmintier, Bryan; Krishnamurthy, Dheepak; Wu, Hongyu
2016-12-12
Uncertainty in the future adoption patterns for distributed energy resources (DERs) introduces a challenge for electric distribution system planning. This paper explores the potential for flexibility in design - also known as real options - to identify design solutions that may never emerge when future DER patterns are treated as deterministic. A test case for storage system design with uncertain distributed generation for solar photovoltaics (DGPV) demonstrates this approach and is used to study sensitivities to a range of techno-economic assumptions.
Your Library's Future: When Leaders Leave, Succession Planning Can Smooth the Transitions
ERIC Educational Resources Information Center
Singer, Paula; Goodrich, Jeanne; Goldberg, Linda
2004-01-01
The future is around the corner. Succession planning will only happen when the right ingredients are there at the start. This article describes thirteen succession planning ingredients that will aid in the future succession of library systems.
Superconducting 112 MHz QWR electron gun
DOE Office of Scientific and Technical Information (OSTI.GOV)
Belomestnykh, S.; Ben-Zvi, I.; Boulware, C.H.
Brookhaven National Laboratory and Niowave, Inc. have designed and fabricated a superconducting 112 MHz quarter-wave resonator (QWR) electron gun. The first cold test of the QWR cryomodule has been completed at Niowave. The paper describes the cryomodule design, presents the cold test results, and outline plans to upgrade the cryomodule. Future experiments include studies of different photocathodes and use for the coherent electron cooling proof-of-principle experiment. Two cathode stalk options, one for multi-alkali photocathodes and the other one for a diamond-amplified photocathode, are discussed. A quarter-wave resonator concept of superconducting RF (SRF) electron gun was proposed at BNL for electronmore » cooling hadron beams in RHIC. QWRs can be made sufficiently compact even at low RF frequencies (long wavelengths). The long wavelength allows to produce long electron bunches, thus minimizing space charge effects and enabling high bunch charge. Also, such guns should be suitable for experiments requiring high average current electron beams. A 112 MHz QWR gun was designed, fabricated, and cold-tested in collaboration between BNL and Niowave. This is the lowest frequency SRF gun ever tested successfully. In this paper we describe the gun design and fabrication, present the cold test results, and outline our plans. This gun will also serve as a prototype for a future SRF gun to be used for coherent electron cooling of hadrons in eRHIC.« less
Thermal airborne multispectral aster simulator and its preliminary results
NASA Astrophysics Data System (ADS)
Mills, F.; Kannari, Y.; Watanabe, H.; Sano, M.; Chang, S. H.
1994-03-01
An Airborne ASTER Simulator (AAS) is being developed for the Japan Resources Observation System Organization (JAROS) by the Geophysical Environmental Research (GER) Corporation. The first test flights of the AAS were over Cuprite, Nevada; Long Valley, California; and Death Valley, California, in December 1991. Preliminary laboratory tests at NASA's Stennis Space Center (SSC) were completed in April 1992. The results of the these tests indicate the AAS can discriminate between silicate and non-silicate rocks. The improvements planned for the next two years may give a spectral Full-Width at Half-Maximum (FWHM) of 0.3 μm and NEΔT of 0.2 - 0.5°K. The AAS has the potential to become a good tool for airborne TIR research and can be used for simulations of future satellite-borne TIR sensors. Flight tests over Cuprite, Nevada, and Castaic Lake, California, are planned for October-December 1992.
Testing of Twin Linear Aerospike XRS-2200 Engine
NASA Technical Reports Server (NTRS)
2001-01-01
The test of twin Linear Aerospike XRS-2200 engines, originally built for the X-33 program, was performed on August 6, 2001 at NASA's Sternis Space Center, Mississippi. The engines were fired for the planned 90 seconds and reached a planned maximum power of 85 percent. NASA's Second Generation Reusable Launch Vehicle Program , also known as the Space Launch Initiative (SLI), is making advances in propulsion technology with this third and final successful engine hot fire, designed to test electro-mechanical actuators. Information learned from this hot fire test series about new electro-mechanical actuator technology, which controls the flow of propellants in rocket engines, could provide key advancements for the propulsion systems for future spacecraft. The Second Generation Reusable Launch Vehicle Program, led by NASA's Marshall Space Flight Center in Huntsville, Alabama, is a technology development program designed to increase safety and reliability while reducing costs for space travel. The X-33 program was cancelled in March 2001.
An Analysis of Navigation Algorithms for Smartphones Using J2ME
NASA Astrophysics Data System (ADS)
Santos, André C.; Tarrataca, Luís; Cardoso, João M. P.
Embedded systems are considered one of the most potential areas for future innovations. Two embedded fields that will most certainly take a primary role in future innovations are mobile robotics and mobile computing. Mobile robots and smartphones are growing in number and functionalities, becoming a presence in our daily life. In this paper, we study the current feasibility of a smartphone to execute navigation algorithms. As a test case, we use a smartphone to control an autonomous mobile robot. We tested three navigation problems: Mapping, Localization and Path Planning. For each of these problems, an algorithm has been chosen, developed in J2ME, and tested on the field. Results show the current mobile Java capacity for executing computationally demanding algorithms and reveal the real possibility of using smartphones for autonomous navigation.
Commerce Lab - An enabling facility and test bed for commercial flight opportunities
NASA Technical Reports Server (NTRS)
Robertson, Jack; Atkins, Harry L.; Williams, John R.
1986-01-01
Commerce Lab is conceived as an adjunct to the National Space Transportation System (NSTS) by providing a focal point for commercial missions which could utilize existing NSTS carrier and resource capabilities for on-orbit experimentation in the microgravity sciences. In this context, the Commerce Lab provides an enabling facility and test bed for commercial flight opportunities. Commerce Lab program activities to date have focused on mission planning for private sector involvement in the space program to facilitate the commercial exploitation of the microgravity environment for materials processing research and development. It is expected that Commerce Lab will provide a logical transition between currently planned NSTS missions and future microgravity science and commercial R&D missions centered around the Space Station. The present study identifies candidate Commerce Lab flight experiments and their development status and projects a mission traffic model that can be used in commercial mission planning.
Mohammed, Emad A; Naugler, Christopher
2017-01-01
Demand forecasting is the area of predictive analytics devoted to predicting future volumes of services or consumables. Fair understanding and estimation of how demand will vary facilitates the optimal utilization of resources. In a medical laboratory, accurate forecasting of future demand, that is, test volumes, can increase efficiency and facilitate long-term laboratory planning. Importantly, in an era of utilization management initiatives, accurately predicted volumes compared to the realized test volumes can form a precise way to evaluate utilization management initiatives. Laboratory test volumes are often highly amenable to forecasting by time-series models; however, the statistical software needed to do this is generally either expensive or highly technical. In this paper, we describe an open-source web-based software tool for time-series forecasting and explain how to use it as a demand forecasting tool in clinical laboratories to estimate test volumes. This tool has three different models, that is, Holt-Winters multiplicative, Holt-Winters additive, and simple linear regression. Moreover, these models are ranked and the best one is highlighted. This tool will allow anyone with historic test volume data to model future demand.
Mohammed, Emad A.; Naugler, Christopher
2017-01-01
Background: Demand forecasting is the area of predictive analytics devoted to predicting future volumes of services or consumables. Fair understanding and estimation of how demand will vary facilitates the optimal utilization of resources. In a medical laboratory, accurate forecasting of future demand, that is, test volumes, can increase efficiency and facilitate long-term laboratory planning. Importantly, in an era of utilization management initiatives, accurately predicted volumes compared to the realized test volumes can form a precise way to evaluate utilization management initiatives. Laboratory test volumes are often highly amenable to forecasting by time-series models; however, the statistical software needed to do this is generally either expensive or highly technical. Method: In this paper, we describe an open-source web-based software tool for time-series forecasting and explain how to use it as a demand forecasting tool in clinical laboratories to estimate test volumes. Results: This tool has three different models, that is, Holt-Winters multiplicative, Holt-Winters additive, and simple linear regression. Moreover, these models are ranked and the best one is highlighted. Conclusion: This tool will allow anyone with historic test volume data to model future demand. PMID:28400996
Performance testing of an off-plane reflection grating and silicon pore optic spectrograph at PANTER
NASA Astrophysics Data System (ADS)
Marlowe, Hannah; McEntaffer, Randall L.; Allured, Ryan; DeRoo, Casey T.; Donovan, Benjamin D.; Miles, Drew M.; Tutt, James H.; Burwitz, Vadim; Menz, Benedikt; Hartner, Gisela D.; Smith, Randall K.; Cheimets, Peter; Hertz, Edward; Bookbinder, Jay A.; Günther, Ramses; Yanson, Alex; Vacanti, Giuseppe; Ackermann, Marcelo
2015-10-01
An x-ray spectrograph consisting of aligned, radially ruled off-plane reflection gratings and silicon pore optics (SPO) was tested at the Max Planck Institute for Extraterrestrial Physics PANTER x-ray test facility. SPO is a test module for the proposed Arcus mission, which will also feature aligned off-plane reflection gratings. This test is the first time two off-plane gratings were actively aligned to each other and with an SPO to produce an overlapped spectrum. We report the performance of the complete spectrograph utilizing the aligned gratings module and plans for future development.
A Survey of Terrain Modeling Technologies and Techniques
2007-09-01
Washington , DC 20314-1000 ERDC/TEC TR-08-2 ii Abstract: Test planning, rehearsal, and distributed test events for Future Combat Systems (FCS) require...distance) for all five lines of control points. Blue circles are errors of DSM (original data), red squares are DTM (bare Earth, processed by Intermap...circles are DSM, red squares are DTM ........... 8 5 Distribution of errors for line No. 729. Blue circles are DSM, red squares are DTM
The Theory of Planned Behavior as a Predictor of HIV Testing Intention.
Ayodele, Olabode
2017-03-01
This investigation tests the theory of planned behavior (TPB) as a predictor of HIV testing intention among Nigerian university undergraduate students. A cross-sectional study of 392 students was conducted using a self-administered structured questionnaire that measured socio-demographics, perceived risk of human immunodeficiency virus (HIV) infection, and TPB constructs. Analysis was based on 273 students who had never been tested for HIV. Hierarchical multiple regression analysis assessed the applicability of the TPB in predicting HIV testing intention and additional predictive value of perceived risk of HIV infection. The prediction model containing TPB constructs explained 35% of the variance in HIV testing intention, with attitude and perceived behavioral control making significant and unique contributions to intention. Perceived risk of HIV infection contributed marginally (2%) but significantly to the final prediction model. Findings supported the TPB in predicting HIV testing intention. Although future studies must determine the generalizability of these results, the findings highlight the importance of perceived behavioral control, attitude, and perceived risk of HIV infection in the prediction of HIV testing intention among students who have not previously tested for HIV.
ERIC Educational Resources Information Center
Morrison, James L.; Renfro, William L.
The concepts of long-range planning and strategic planning are explained, and a planning model is proposed. Attention is directed to an environmental scanning model that is congruent with the concept of strategic planning and that emerges from one portion of the futures research community, issues management. A third planning model, the strategic…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Silvas, A. J.
The purpose of this Post-Closure Strategy is to provide a consistent methodology for continual evaluation of post-closure requirements for use-restricted areas on the Nevada National Security Site (NNSS), Nevada Test and Training Range (NTTR), and Tonopah Test Range (TTR) to consolidate, modify, or streamline the program. In addition, this document stipulates the creation of a single consolidated Post-Closure Plan that will detail the current post-closure requirements for all active use restrictions (URs) and outlines its implementation and subsequent revision. This strategy will ensure effective management and control of the post-closure sites. There are currently over 200 URs located on themore » NNSS, NTTR, and TTR. Post-closure requirements were initially established in the Closure Report for each site. In some cases, changes to the post-closure requirements have been implemented through addenda, errata sheets, records of technical change, or letters. Post-closure requirements have been collected from these multiple sources and consolidated into several formats, such as summaries and databases. This structure increases the possibility of inconsistencies and uncertainty. As more URs are established and the post-closure program is expanded, the need for a comprehensive approach for managing the program will increase. Not only should the current requirements be obtainable from a single source that supersedes all previous requirements, but the strategy for modifying the requirements should be standardized. This will enable more effective management of the program into the future. This strategy document and the subsequent comprehensive plan are to be implemented under the assumption that the NNSS and outlying sites will be under the purview of the U.S. Department of Energy, National Nuclear Security Administration for the foreseeable future. This strategy was also developed assuming that regulatory control of the sites remains static. The comprehensive plan is not intended to be a permanent long-term stewardship plan. However, it is intended to clarify requirements and identify components to effectively manage the sites until regulatory requirements are met or management of the site changes. The Environmental Management Program is required to manage these sites until the NNSS Environmental Restoration program is completed, currently planned for 2030. Prior to completion of the Environmental Restoration program, additional planning will be conducted to ensure that long-term stewardship of the sites is maintained. A comprehensive post-closure plan can be transitioned effectively into any future site-wide long-term stewardship program that may be developed. Therefore, the post-closure plan will include current aspects of the post-closure program that are also important aspects of long-term stewardship, including the following: • Management of physical and engineering controls such as fences, signs, and soil covers • Management of institutional and administrative controls such as use restrictions and real estate systems • Management of monitoring and maintenance programs • Management of information related to the sites such as geographic information system data and related documentation The strategy will also allow for periodic review and modification of any aspect of the program to ensure continued effectiveness.« less
NASA Astrophysics Data System (ADS)
Chamitoff, Gregory E.; Saenz-Otero, Alvar; Katz, Jacob G.; Ulrich, Steve; Morrell, Benjamin J.; Gibbens, Peter W.
2018-01-01
This paper presents the development of a real-time path-planning optimization approach to controlling the motion of space-based robots. The algorithm is capable of planning three dimensional trajectories for a robot to navigate within complex surroundings that include numerous static and dynamic obstacles, path constraints and performance limitations. The methodology employs a unique transformation that enables rapid generation of feasible solutions for complex geometries, making it suitable for application to real-time operations and dynamic environments. This strategy was implemented on the Synchronized Position Hold Engage Reorient Experimental Satellite (SPHERES) test-bed on the International Space Station (ISS), and experimental testing was conducted onboard the ISS during Expedition 17 by the first author. Lessons learned from the on-orbit tests were used to further refine the algorithm for future implementations.
DOT National Transportation Integrated Search
1993-06-01
The safety of magnetlcally levitated (maglev) and high speed rail (HSR) trains proposed for application in the : United States is the responsibility of the Federal Railroad Administratlon (FRA). Plans for near future US applications : include maglev ...
DOT National Transportation Integrated Search
1993-06-01
The safety of magnetically levitated (maglev) and high speed rail (HSR) trains proposed for application in the United States is the responsibility of the Federal Railroad Administration (FRA). Plans for near future US applications include maglev tech...
ERIC Educational Resources Information Center
Zepeda, Cristina D.; Richey, J. Elizabeth; Ronevich, Paul; Nokes-Malach, Timothy J.
2015-01-01
Prior studies have not tested whether an instructional intervention aimed at improving metacognitive skills results in changes to student metacognition, motivation, learning, and future learning in the classroom. We examined whether a 6-hr intervention designed to teach the declarative and procedural components of planning, monitoring, and…
California Education: Planning for a Better Future
ERIC Educational Resources Information Center
Larsen, Eric; Weston, Margaret
2011-01-01
Proficiency rates among California students continue to rise. At the end of the 2009-10 school year, the share of students who demonstrated proficiency on the California Standards Test was greater than 50 percent in both English language arts (ELA) and math. California's proficiency rates have increased more than 18 percentage points over the last…
Evaluation of a Microwave Blade Tip Clearance Sensor for Propulsion Health Monitoring
NASA Technical Reports Server (NTRS)
Woike, Mark R.
2013-01-01
The NASA Glenn Research Center has investigated a microwave blade tip clearance system for the structural health monitoring of gas turbine engines. This presentation describes the sensors and the experiments that have been conducted to evaluate their performance along with future plans for their use on an engine ground test.
Planning Future Instructional Programs through Computerized L2 Dynamic Assessment
ERIC Educational Resources Information Center
Ebadi, Saman; Saeedian, Abdulbaset
2016-01-01
Dynamic Assessment (DA) is a postmodern notion in testing which sees instruction and assessment as inextricably mingled contending that learners will progress if provided with dynamic interactions. The main purpose of the study is to see if the scores generated by the computerized dynamic assessment (C-DA) which is grounded in Vygotsky's…
Applications of Computational Toxicology to the Understanding of Risks of Developmental Toxicity
In response to a request from US EPA, the National Research Council (NRC) developed a long-range vision and strategic plan for the future of toxicity testing in the 21st century. The report, published in 2007, called for a transformation in toxicology that would provide a more r...
Long Range Navigation for Mars Rovers Using Sensor-Based Path Planning and Visual Localisation
NASA Technical Reports Server (NTRS)
Laubach, Sharon L.; Olson, Clark F.; Burdick, Joel W.; Hayati, Samad
1999-01-01
The Mars Pathfinder mission illustrated the benefits of including a mobile robotic explorer on a planetary mission. However, for future Mars rover missions, significantly increased autonomy in navigation is required in order to meet demanding mission criteria. To address these requirements, we have developed new path planning and localisation capabilities that allow a rover to navigate robustly to a distant landmark. These algorithms have been implemented on the JPL Rocky 7 prototype microrover and have been tested extensively in the JPL MarsYard, as well as in natural terrain.
Fisichelli, Nicholas A.; Schuurman, Gregor; Symstad, Amy J.; Ray, Andrea; Friedman, Jonathan M.; Miller, Brian; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the central North Dakota focal area, with an emphasis on Knife River Indian Villages National Historic Site. The report explainsscenario planning as an adaptation tool in general, then describes how it was applied to the central North Dakota focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held November 12-13, 2015 in Bismarck, ND, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Fisichelli, Nicholas A.; Schuurman, Gregor W.; Symstad, Amy J.; Ray, Andrea; Miller, Brian; Cross, Molly; Rowland, Erika
2016-01-01
The Scaling Climate Change Adaptation in the Northern Great Plains through Regional Climate Summaries and Local Qualitative-Quantitative Scenario Planning Workshops project synthesizes climate data into 3-5 distinct but plausible climate summaries for the northern Great Plains region; crafts quantitative summaries of these climate futures for two focal areas; and applies these local summaries by developing climate-resource-management scenarios through participatory workshops and, where possible, simulation models. The two focal areas are central North Dakota and southwest South Dakota (Figure 1). The primary objective of this project is to help resource managers and scientists in a focal area use scenario planning to make management and planning decisions based on assessments of critical future uncertainties.This report summarizes project work for public and tribal lands in the southwest South Dakota grasslands focal area, with an emphasis on Badlands National Park and Buffalo Gap National Grassland. The report explains scenario planning as an adaptation tool in general, then describes how it was applied to the focal area in three phases. Priority resource management and climate uncertainties were identified in the orientation phase. Local climate summaries for relevant, divergent, and challenging climate scenarios were developed in the second phase. In the final phase, a two-day scenario planning workshop held January 20-21, 2016 in Rapid City, South Dakota, featured scenario development and implications, testing management decisions, and methods for operationalizing scenario planning outcomes.
Future Focusing: An Alternative to Long-Range Planning.
ERIC Educational Resources Information Center
Peck, Robert D.
Characteristics of small college administration as it applies to the future are described. Consideration is given to the process for anticipating change in the circumstances surrounding colleges, identifying opportunities, and planning to take advantage of positive changes in the environment (i.e., future focused planning). The use of the Planning…
Overseas testing of a multisensor landmine detection system: results and lessons learned
NASA Astrophysics Data System (ADS)
Keranen, Joe G.; Topolosky, Zeke
2009-05-01
The Nemesis detection system has been developed to provide an efficient and reliable unmanned, multi-sensor, groundbased platform to detect and mark landmines. The detection system consists of two detection sensor arrays: a Ground Penetrating Synthetic Aperture Radar (GPSAR) developed by Planning Systems, Inc. (PSI) and an electromagnetic induction (EMI) sensor array developed by Minelab Electronics, PTY. Limited. Under direction of the Night Vision and Electronic Sensors Directorate (NVESD), overseas testing was performed at Kampong Chhnang Test Center (KCTC), Cambodia, from May 12-30, 2008. Test objectives included: evaluation of detection performance, demonstration of real-time visualization and alarm generation, and evaluation of system operational efficiency. Testing was performed on five sensor test lanes, each consisting of a unique soil mixture and three off-road lanes which include curves, overgrowth, potholes, and non-uniform lane geometry. In this paper, we outline the test objectives, procedures, results, and lessons learned from overseas testing. We also describe the current state of the system, and plans for future enhancements and modifications including clutter rejection and feature-level fusion.
Crane Cell Testing Support of NASA/Goddard Space Flight Center: An Update
NASA Technical Reports Server (NTRS)
Strawn, Mike; David, Jerry; Rao, Gopalakrishna M.
2001-01-01
The objectives presented in this viewgraph presentation include: 1) Verify the quality and reliability of aerospace battery cells and batteries for NASA flight programs; 2) Disseminate the data to develop a plan for in-orbit battery management and to design a cell/battery for future NASA spacecraft; and 3) Establish a cell test data base for rechargeable cell/batteries. In summary: quality EPT Ni-H2, EPT Super NiCd and SAFT NiCd cells have been demonstrated for aerospace applications; the data has been provided to NASA Centers and other agencies for their use and application; developed plan and used in NASA in-orbit battery management. Database on rechargeable cell/batteries is now available for customer use.
Advanced long term cryogenic storage systems
NASA Technical Reports Server (NTRS)
Brown, Norman S.
1987-01-01
Long term, cryogenic fluid storage facilities will be required to support future space programs such as the space-based Orbital Transfer Vehicle (OTV), Telescopes, and Laser Systems. An orbital liquid oxygen/liquid hydrogen storage system with an initial capacity of approximately 200,000 lb will be required. The storage facility tank design must have the capability of fluid acquisition in microgravity and limit cryogen boiloff due to environmental heating. Cryogenic boiloff management features, minimizing Earth-to-orbit transportation costs, will include advanced thick multilayer insulation/integrated vapor cooled shield concepts, low conductance support structures, and refrigeration/reliquefaction systems. Contracted study efforts are under way to develop storage system designs, technology plans, test article hardware designs, and develop plans for ground/flight testing.
Extended-Range Forecasts at Climate Prediction Center: Current Status and Future Plans
NASA Astrophysics Data System (ADS)
Kumar, A.
2016-12-01
Motivated by a user need to provide forecast information on extended-range time-scales (i.e., weeks 2-4), in recent years Climate Prediction Center (CPC) has made considerable efforts towards developing and testing the feasibility for developing the required forecasts. The forecasts targeting this particular time-scale face a unique challenge in that while the forecast skill due to atmospheric initial conditions is small (because of rapid decay in the memory associated with the atmospheric initial conditions), short time averages for which forecasts are made do not benefit from skill associated with anomalous boundary conditions either. Despite these challenges, CPC has embarked on providing an experimental outlook for weeks 3-4 average. The talk will summarize the current status of CPC's current suite of extended-range forecast products, and further, will discuss some future plans.
Space Station Upgrades Continue on This Week @NASA – March 31, 2017
2017-03-31
Work continues aboard the International Space Station on upgrades to prepare it for future operational activities. Ground controllers, using the station’s robotic arm, moved the Pressurized Mating Adapter-3 (PMA-3) from the Tranquility module to the station’s Harmony module March 26. PMA-3 will be outfitted with one of two International Docking Adapters to accommodate U.S. commercial spacecraft carrying astronauts on future missions. Four days after the PMA-3 move, NASA’s Shane Kimbrough and Peggy Whitson conducted the second in a series of three planned spacewalks to complete work related to the upgrades. The third spacewalk is planned in April. Also, James Webb Space Telescope Completes Acoustic and Vibration Tests, MAVEN Data Helps Measure Loss of Mars’ Atmosphere, Getting Excited About STEM, and New NASA App for Amazon Fire TV!
Practice Plans of Today's Medical Students.
ERIC Educational Resources Information Center
Rosen, Raye Hudson; And Others
1981-01-01
Students' future practice plans were surveyed by questionnaire at three Michigan medical schools to study future physician productivity and its implications for health manpower planning. Results suggested that the students planned to work less than they thought their role models did. (LB)
Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations
NASA Technical Reports Server (NTRS)
Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, Dave
2016-01-01
From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Primary Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. A key aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Intermittent and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5 testing.
NASA Technical Reports Server (NTRS)
Thome, Kurtis; McCorkel, Joel; Hair, Jason; McAndrew, Brendan; Daw, Adrian; Jennings, Donald; Rabin, Douglas
2012-01-01
The Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission addresses the need to observe high-accuracy, long-term climate change trends and to use decadal change observations as the most critical method to determine the accuracy of climate change. One of the major objectives of CLARREO is to advance the accuracy of SI traceable absolute calibration at infrared and reflected solar wavelengths. This advance is required to reach the on-orbit absolute accuracy required to allow climate change observations to survive data gaps while remaining sufficiently accurate to observe climate change to within the uncertainty of the limit of natural variability. While these capabilities exist at NIST in the laboratory, there is a need to demonstrate that it can move successfully from NIST to NASA and/or instrument vendor capabilities for future spaceborne instruments. The current work describes the test plan for the Solar, Lunar for Absolute Reflectance Imaging Spectroradiometer (SOLARIS) which is the calibration demonstration system (CDS) for the reflected solar portion of CLARREO. The goal of the CDS is to allow the testing and evaluation of calibration approaches , alternate design and/or implementation approaches and components for the CLARREO mission. SOLARIS also provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result of efforts with the SOLARIS CDS will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections. The CLARREO mission addresses the need to observe high-accuracy, long-term climate change trends and advance the accuracy of SI traceable absolute calibration. The current work describes the test plan for the SOLARIS which is the calibration demonstration system for the reflected solar portion of CLARREO. SOLARIS provides a test-bed for detector technologies, non-linearity determination and uncertainties, and application of future technology developments and suggested spacecraft instrument design modifications. The end result will be an SI-traceable error budget for reflectance retrieval using solar irradiance as a reference and methods for laboratory-based, absolute calibration suitable for climate-quality data collections.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoogcarspel, S; Kerkmeijer, L; Lagendijk, J
The Alderson phantom is a human shaped quality assurance tool that has been used for over 30 years in radiotherapy. The phantom can provide integrated tests of the entire chain of treatment planning and delivery. The purpose of this research was to investigate if this phantom can be used to chain test a treatment on the MRI linear accelerator (MRL) which is currently being developed at the UMC Utrecht, in collaboration with Elekta and Philips. The latter was demonstrated by chain testing the future First-in-Man treatments with this system.An Alderson phantom was used to chain test an entire treatment withmore » the MRL. First, a CT was acquired of the phantom with additional markers that are both visible on MR and CT. A treatment plan for treating bone metastases in the sacrum was made. The phantom was consecutively placed in the MRL. For MRI imaging, an 3D volume was acquired. The initially developed treatment plan was then simulated on the new MRI dataset. For simulation, both the MR and CT data was used by registering them together. Before treatment delivery a MV image was acquired and compared with a DRR that was calculated form the MR/CT registration data. Finally, the treatment was delivered. Figure 1 shows both the T1 weighted MR-image of the phantom and the CT that was registered to the MR image. Figure 2 shows both the calculated and measured MV image that was acquired by the MV panel. Figure 3 shows the dose distribution that was simulated. The total elapsed time for the entire procedure excluding irradiation was 13:35 minutes.The Alderson Phantom yields sufficient MR contrast and can be used for full MR guided radiotherapy treatment chain testing. As a result, we are able to perform an end-to-end chain test of the future First-in-Man treatments.« less
Acceptance testing for PACS: from methodology to design to implementation
NASA Astrophysics Data System (ADS)
Liu, Brent J.; Huang, H. K.
2004-04-01
Acceptance Testing (AT) is a crucial step in the implementation process of a PACS within a clinical environment. AT determines whether the PACS is ready for clinical use and marks the official sign off of the PACS product. Most PACS vendors have Acceptance Testing (AT) plans, however, these plans do not provide a complete and robust evaluation of the full system. In addition, different sites will have different special requirements that vendor AT plans do not cover. The purpose of this paper is to introduce a protocol for AT design and present case studies of AT performed on clinical PACS. A methodology is presented that includes identifying testing components within PACS, quality assurance for both functionality and performance, and technical testing focusing on key single points-of-failure within the PACS product. Tools and resources that provide assistance in performing AT are discussed. In addition, implementation of the AT within the clinical environment and the overall implementation timeline of the PACS process are presented. Finally, case studies of actual AT of clinical PACS performed in the healthcare environment will be reviewed. The methodology for designing and implementing a robust AT plan for PACS was documented and has been used in PACS acceptance tests in several sites. This methodology can be applied to any PACS and can be used as a validation for the PACS product being acquired by radiology departments and hospitals. A methodology for AT design and implementation was presented that can be applied to future PACS installations. A robust AT plan for a PACS installation can increase both the utilization and satisfaction of a successful implementation of a PACS product that benefits both vendor and customer.
Brugha, Ruairí; McAleese, Sara; Dicker, Pat; Tyrrell, Ella; Thomas, Steve; Normand, Charles; Humphries, Niamh
2016-06-30
International recruitment is a common strategy used by high-income countries to meet their medical workforce needs. Ireland, despite training sufficient doctors to meet its internal demand, continues to be heavily dependent on foreign-trained doctors, many of whom may migrate onwards to new destination countries. A cross-sectional study was conducted to measure and analyse the factors associated with the migratory intentions of foreign doctors in Ireland. A total of 366 non-European nationals registered as medical doctors in Ireland completed an online survey assessing their reasons for migrating to Ireland, their experiences whilst working and living in Ireland, and their future plans. Factors associated with future plans - whether to remain in Ireland, return home or migrate to a new destination country - were tested by bivariate and multivariate analyses, including discriminant analysis. Of the 345 foreign doctors who responded to the question regarding their future plans, 16 % of whom were Irish-trained, 30 % planned to remain in Ireland, 23 % planned to return home and 47 % to migrate onwards. Country of origin, personal and professional reasons for migrating, experiences of training and supervision, opportunities for career progression, type of employment contract, citizenship status, and satisfaction with life in Ireland were all factors statistically significantly associated with the three migratory outcomes. Reported plans may not result in enacted emigration. However, the findings support a growing body of evidence highlighting dissatisfaction with current career opportunities, contributing to the emigration of Irish doctors and onward migration of foreign doctors. Implementation of the WHO Global Code, which requires member states to train and retain their own health workforce, could also help reduce onward migration of foreign doctors to new destination countries. Ireland has initiated the provision of tailored postgraduate training to doctors from Pakistan, enabling these doctors to return home with improved skills of benefit to the source country.
Karimli, Leyla; Ssewamala, Fred M
2015-10-01
This present study tests the proposition that an economic strengthening intervention for families caring for AIDS-orphaned adolescents would positively affect adolescent future orientation and psychosocial outcomes through increased asset accumulation (in this case, by increasing family savings). Using longitudinal data from the cluster-randomized experiment, we ran generalized estimating equation models with robust standard errors clustering on individual observations. To examine whether family savings mediate the effect of the intervention on adolescents' future orientation and psychosocial outcomes, analyses were conducted in three steps: (1) testing the effect of intervention on mediator; (2) testing the effect of mediator on outcomes, controlling for the intervention; and (3) testing the significance of mediating effect using Sobel-Goodman method. Asymmetric confidence intervals for mediated effect were obtained through bootstrapping-to address the assumption of normal distribution. Results indicate that participation in a matched Child Savings Account (CSA) program improved adolescents' future orientation and psychosocial outcomes by reducing hopelessness, enhancing self-concept, and improving adolescents' confidence about their educational plans. However, the positive intervention effect on adolescent future orientation and psychosocial outcomes was not transmitted through saving. In other words, participation in the matched CSA program improved adolescent future orientation and psychosocial outcomes regardless of its impact on reported savings. Further research is necessary to understand exactly how participation in economic strengthening interventions, for example, those that employ matched CSAs, shape adolescent future orientation and psychosocial outcomes: what, if not savings, transmits the treatment effect and how? Copyright © 2015 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.
Karimli, Leyla; Ssewamala, Fred M.
2015-01-01
Purpose This present study tests the proposition that an economic strengthening intervention for families caring for AIDS-orphaned adolescents would positively affect adolescent future orientation and psychosocial outcomes through increased asset-accumulation (in this case, by increasing family savings). Methods Using longitudinal data from the cluster-randomized experiment we ran generalized estimating equation (GEE) models with robust standard errors clustering on individual observations. To examine whether family savings mediate the effect of the intervention on adolescents’ future orientation and psychosocial outcomes, analyses were conducted in three steps: (1) testing the effect of intervention on mediator; (2) testing the effect of mediator on outcomes, controlling for the intervention; and (3) testing the significance of mediating effect using Sobel-Goodman method. Asymmetric confidence intervals for mediated effect were obtained through bootstrapping—to address the assumption of normal distribution. Results Results indicate that participation in a matched Child Savings Account program improved adolescents’ future orientation and psychosocial outcomes by reducing hopelessness, enhancing self-concept, and improving adolescents’ confidence about their educational plans. However, the positive intervention effect on adolescent future orientation and psychosocial outcomes was not transmitted through saving. In other words, participation in the matched Child Savings Account program improved adolescent future orientation and psychosocial outcomes regardless of its impact on reported savings. Conclusions Further research is necessary to understand exactly how participation in economic strengthening interventions, for example, those that employ matched Child Savings Accounts, shape adolescent future orientation and psychosocial outcomes: what, if not savings, transmits the treatment effect and how? PMID:26271162
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
...-208; Report No. 2945] Connect America Fund; A National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support et al... applicability. Subject: Connect America Fund: A National Broadband Plan for Our Future; Establishing Just and...
Embedding Self-Determination and Futures Planning within a Schoolwide Framework
ERIC Educational Resources Information Center
Bohanon, Hank; Castillo, Jose; Afton, Morgan
2015-01-01
This article illustrates the infusion of self-determination approaches (e.g., futures planning) within a schoolwide context. Unfortunately, some students are not explicitly instructed by school staff to address their plans for the future. This may be a result of school professionals' feelings of inadequacy to address skill sets outside of…
Goddard Space Flight Center Spacecraft Magnetic Test Facility Restoration Project
NASA Technical Reports Server (NTRS)
Vernier, Robert; Bonalksy, Todd; Slavin, James
2004-01-01
The Goddard Space Flight Center Spacecraft Magnetic Test Facility (SMTF) was constructed in the 1960's for the purpose of simulating geomagnetic and interplanetary magnetic field environments. The facility includes a three axis Braunbek coil system consisting of 12 loops, 4 loops on each of the three orthogonal axes; a remote Earth field sensing magnetometer and servo controller; and a remote power control and instrumentation building. The inner coils of the Braunbek system are 42-foot in diameter with a 10-foot by 10-foot opening through the outer coils to accommodate spacecraft access into the test volume. The physical size and precision of the facility are matched by only two other such facilities in the world. The facility was used extensively from the late 1960's until the early 1990's when the requirement for spacecraft level testing diminished. New NASA missions planned under the Living with a Star, Solar Terrestrial Probes, Explorer, and New Millennium Programs include precision, high-resolution magnetometers to obtain magnetic field data that is critical to fulfilling their scientific mission. It is highly likely that future Lunar and Martian exploration missions will also use precision magnetometers to conduct geophysical magnetic surveys. To ensure the success of these missions, ground-testing using a magnetic test facility such as the GSFC SMTF will be required. This paper describes the history of the facility, the future mission requirements that have renewed the need for spacecraft level magnetic testing, and the plans for restoring the facility to be capable of performing to its original design specifications.
Goddard Space Flight Center Spacecraft Magnetic Test Facility Restoration Project
NASA Technical Reports Server (NTRS)
Vernier, Robert; Bonalosky, Todd; Slavin, James
2004-01-01
The Goddard Space Flight Center Spacecraft Magnetic Test Facility (SMTF) was constructed in the 1960's for the purpose of simulating geomagnetic and interplanetary magnetic field environments. The facility includes a three axis Braunbek coil system consisting of 12 loops, 4 loops on each of the three orthogonal axes; a remote Earth field sensing magnetometer and servo controller; and a remote power control and instrumentation building. The inner coils of the Braunbek system are 42-foot in diameter with a 10-foot by 10-foot opening through the outer coils to accommodate spacecraft access into the test volume. The physical size and precision of the facility are matched by only two other such facilities in the world. The facility was used extensively from the late 1960's until the early 1990's when the requirement for spacecraft level testing diminished. New NASA missions planned under the Living with a Star, Solar Terrestrial Probes, Explorer, and New Millennium Programs include precision, high-resolution magnetometers to obtain magnetic field data that is critical to fulfilling their scientific mission. It is highly likely that future Lunar and Martian exploration missions will also use precision magnetometers to conduct geophysical magnetic surveys. To ensure the success of these missions, ground testing using a magnetic test facility such as the GSFC SMTF will be required. This paper describes the history of the facility, the future mission requirements that have renewed the need for spacecraft level magnetic testing, and the plans for restoring the facility to be capable of performing to its original design specifications.
Component Reliability Testing of Long-Life Sorption Cryocoolers
NASA Technical Reports Server (NTRS)
Bard, S.; Wu, J.; Karlmann, P.; Mirate, C.; Wade, L.
1994-01-01
This paper summarizes ongoing experiments characterizing the ability of critical sorption cryocooler components to achieve highly reliable operation for long-life space missions. Test data obtained over the past several years at JPL are entirely consistent with achieving ten year life for sorption compressors, electrical heaters, container materials, valves, and various sorbent materials suitable for driving 8 to 180 K refrigeration stages. Test results for various compressor systems are reported. Planned future tests necessary to gain a detailed understanding of the sensitivity of cooler performance and component life to operating constraints, design configurations, and fabrication, assembly and handling techniques, are also discussed.
Direct to confusion: lessons learned from marketing BRCA testing.
Matloff, Ellen; Caplan, Arthur
2008-06-01
Myriad Genetics holds a patent on testing for the hereditary breast and ovarian cancer genes, BRCA1 and BRCA2, and therefore has a forced monopoly on this critical genetic test. Myriad launched a Direct-to-Consumer (DTC) marketing campaign in the Northeast United States in September 2007 and plans to expand that campaign to Florida and Texas in 2008. The ethics of Myriad's patent, forced monopoly and DTC campaign will be reviewed, as well as the impact of this situation on patient access and care, physician liability, and the future of DTC campaigns for genetic testing.
The future of employer-sponsored retiree medical plans.
Rappaport, A M; Kalman, R W
1987-01-01
Complex issues cloud the economic security of people who are covered by employer-sponsored retiree medical plans. The future stability of these plans is especially confusing. In their paper, the authors carefully analyze the current structure of retiree medical plans, including the effect of certain laws. Their clarifications are objective and concise. Of particular timeliness and practicality--particularly for public policy markers--is the authors' four-point strategy to help stabilize the future.
Long-Term Surveillance and Maintenance Plan for the U.S. Department of Energy Amchitka, Alaska, Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2008-09-01
This Long-Term Surveillance and Maintenance Plan describes how the U.S. Department of Energy (DOE) intends to fulfill its mission to maintain protection of human health and the environment at the Amchitka, Alaska, Site1. Three underground nuclear tests were conducted on Amchitka Island. The U.S. Department of Defense, in conjunction with the U.S. Atomic Energy Commission (AEC), conducted the first nuclear test (Long Shot) to provide data that would improve the United States' capability of detecting underground nuclear explosions. The second nuclear test (Milrow) was a weapons-related test conducted by AEC as a means to study the feasibility of detonating amore » much larger device. The final nuclear test (Cannikin), the largest United States underground test, was a weapons-related test. Surface disturbances associated with these tests have been remediated. However, radioactivity remains deep below the surface, contained in and around the test cavities, for which no feasible remediation technology has been identified. In 2006, the groundwater model (Hassan et al. 2002) was updated using 2005 data collected by the Consortium for Risk Evaluation with Stakeholder Participation. Model simulation results indicate there is no breakthrough or seepage of radionuclides into the marine environment within 2,000 years. The Amchitka conceptual model is reasonable; the flow and transport simulation is based on the best available information and data. The simulation results are a quantitative prediction supported by the best available science and technology. This Long-Term Surveillance and Maintenance Plan is an additional step intended for the protection of human health and the environment. This plan may be modified from time to time in the future consistent with the mission to protect human health« less
Leitl, Eugen
2006-01-01
Even more than in previous disasters, Katrina has proven itself to be a testing ground for a plethora of new technologies. Although not all of these technologies did immediately save lives, in this regard a number of them exhibited considerable potential for the future, and hence there is a need to include them in future contingency plans. However, a need for change in the modes and patterns of technology deployment to maximize their leverage has also become very clear. PMID:16420650
Redundant actuator development study. [flight control systems for supersonic transport aircraft
NASA Technical Reports Server (NTRS)
Ryder, D. R.
1973-01-01
Current and past supersonic transport configurations are reviewed to assess redundancy requirements for future airplane control systems. Secondary actuators used in stability augmentation systems will probably be the most critical actuator application and require the highest level of redundancy. Two methods of actuator redundancy mechanization have been recommended for further study. Math models of the recommended systems have been developed for use in future computer simulations. A long range plan has been formulated for actuator hardware development and testing in conjunction with the NASA Flight Simulator for Advanced Aircraft.
Risk and resilience in an uncertain world
Dale, Virginia H.; Jager, Henriette I.; Wolfe, Amy K.; ...
2018-02-01
We report that because the future is uncertain and to some extent unknowable, it is imperative that ecologists become involved in the discussion and planning of future infrastructure and protection from the effects of altered disturbance regimes. Research can test and demonstrate the benefits of protecting or proactively managing important features and places, and processes that enhance provisioning of ecosystem services such as flood control and fire mitigation. In conclusion, it is time to demonstrate how ecological science, when applied to human–environmental systems, can reduce risks and enhance resilience in a complex, changing world.
Risk and resilience in an uncertain world
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dale, Virginia H.; Jager, Henriette I.; Wolfe, Amy K.
We report that because the future is uncertain and to some extent unknowable, it is imperative that ecologists become involved in the discussion and planning of future infrastructure and protection from the effects of altered disturbance regimes. Research can test and demonstrate the benefits of protecting or proactively managing important features and places, and processes that enhance provisioning of ecosystem services such as flood control and fire mitigation. In conclusion, it is time to demonstrate how ecological science, when applied to human–environmental systems, can reduce risks and enhance resilience in a complex, changing world.
Strategic planning for marketers.
Wilson, I
1978-12-01
The merits of strategic planning as a marketing tool are discussed in this article which takes the view that although marketers claim to be future-oriented, they focus too little attention on long-term planning and forecasting. Strategic planning, as defined by these authors, usually encompasses periods of between five and twenty-five years and places less emphasis on the past as an absolute predictor of the future. It takes a more probabilistic view of the future than conventional marketing strategy and looks at the corporation as but one component interacting with the total environment. Inputs are examined in terms of environmental, social, political, technological and economic importance. Because of its futuristic orientation, an important tenant of strategic planning is the preparation of several alternative scenarios ranging from most to least likely. By planning for a wide-range of future market conditions, a corporation is more able to be flexible by anticipating the course of future events, and is less likely to become a captive reactor--as the authors believe is now the case. An example of strategic planning at General Elecric is cited.
EOS Terra Terra Constellation Exit/Future Maneuver Plans Update
NASA Technical Reports Server (NTRS)
Mantziaras, Dimitrios
2016-01-01
This EOS Terra Constellation Exit/Future Maneuver Plans Update presentation will discuss brief history of Terra EOM work; lifetime fuel estimates; baseline vs. proposed plan origin; resultant exit orbit; baseline vs. proposed exit plan; long term orbit altitude; revised lifetime proposal and fallback options.
Baseline Testing of The EV Global E-Bike
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.; Kolacz, John S.; Tavernelli, Paul F.
2001-01-01
The NASA John H. Glenn Research Center initiated baseline testing of the EV Global E-Bike as a way to reduce pollution in urban areas, reduce fossil fuel consumption and reduce Operating costs for transportation systems. The work was done Linder the Hybrid Power Management (HPM) Program, which includes the Hybrid Electric Transit Bus (HETB). The E-Bike is a state of the art, ground up, hybrid electric bicycle. Unique features of the vehicle's power system include the use of an efficient, 400 W. electric hub motor and a 7-speed derailleur system that permits operation as fully electric, fully pedal, or a combination of the two. Other innovative features, such as regenerative braking through ultracapacitor energy storage are planned. Regenerative braking recovers much of the kinetic energy of the vehicle during deceleration. The E-Bike is an inexpensive approach to advance the state of the art in hybrid technology in a practical application. The project transfers space technology to terrestrial use via nontraditional partners, and provides power system data valuable for future space applications. A description of the E-bike, the results of performance testing, and future vehicle development plans is the subject of this report. The report concludes that the E-Bike provides excellent performance, and that the implementation of ultracapacitors in the power system can provide significant performance improvements.
Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles
NASA Technical Reports Server (NTRS)
Jones, Daniel S.; Koelfgen, Syri J.; Barnes, Marvin W.; McCauley, Rachel J.; Wall, Terry M.; Reed, Brian D.; Duncan, C. Miguel
2012-01-01
The NASA Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This paper provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles.
Wuni, Caroline; Turpin, Cornelius A; Dassah, Edward T
2017-08-01
Family planning is an integral component of maternal and child health services in Ghana. Although knowledge on contraception is universal and most women attend maternal and child health services, contraceptive use remains low among women after delivery. This study aimed to determine factors influencing current use and future contraceptive intentions of women who were attending child welfare clinics within 2 years of delivery in Sunyani Municipality, Ghana. We conducted an analytical cross-sectional study among mothers in six selected health care facilities. Data was collected on their socio-demographic characteristics, reproductive and contraceptive experiences and future contraceptive intentions. Categorical variables were compared using the chi-squared (χ 2 ) test. Factors associated with current use and future contraceptive intentions were determined using Poisson regression with a robust error variance to estimate crude and adjusted relative risks (RRs) with 95% confidence intervals (CIs). P < 0.1 was considered statistically significant. A total of 590 women were recruited into the study. Overall, 50.2% of the women were using contraception, 30.7% modern and 19.5% traditional methods. Compared to previous use, more women were using and would prefer the more effective contraceptive methods in future. Significant factors associated with current contraceptive use were, level of education (p = 0.02), discussing family planning during antenatal care (adjusted RR, 1.28; 95% CI, 1.07-1.53), or with one's partner (adjusted RR, 1.22; 95% CI, 1.01-1.47) and previous contraceptive use (adjusted RR, 1.91; 95% CI, 1.56-2.33). Family planning discussions during child welfare clinic (adjusted RR, 1.12; 95% CI, 0.99-1.26) or with one's spouse (adjusted RR, 1.20; 95% CI, 1.08-1.34), desire to space children (adjusted RR, 1.35; 95% CI, 1.17-1.55), previous (adjusted RR, 1.15; 95% CI, 1.05-1.27) and current (adjusted RR, 1.11; 95% CI, 1.01-1.22) contraceptive use were predictive of clients' intention to adopt family planning in the future. Effective counselling on family planning during antenatal and child welfare clinics, and encouraging spousal communication on contraception are likely to increase contraceptive use after delivery.
Problems experienced and envisioned for dynamical physical systems
NASA Technical Reports Server (NTRS)
Ryan, R. S.
1985-01-01
The use of high performance systems, which is the trend of future space systems, naturally leads to lower margins and a higher sensitivity to parameter variations and, therefore, more problems of dynamical physical systems. To circumvent dynamic problems of these systems, appropriate design, verification analysis, and tests must be planned and conducted. The basic design goal is to define the problem before it occurs. The primary approach for meeting this goal is a good understanding and reviewing of the problems experienced in the past in terms of the system under design. This paper reviews many of the dynamic problems experienced in space systems design and operation, categorizes them as to causes, and envisions future program implications, developing recommendations for analysis and test approaches.
The NASA Langley Mars Tumbleweed Rover Prototype
NASA Technical Reports Server (NTRS)
Antol, Jeffrey; Chattin, Richard L.; Copeland, Benjamin M.; Krizann, Shawn A.
2005-01-01
Mars Tumbleweed is a concept for an autonomous rover that would achieve mobility through use of the natural winds on Mars. The wind-blown nature of this vehicle make it an ideal platform for conducting random surveys of the surface, scouting for signs of past or present life as well as examining the potential habitability of sites for future human exploration. NASA Langley Research Center (LaRC) has been studying the dynamics, aerodynamics, and mission concepts of Tumbleweed rovers and has recently developed a prototype Mars Tumbleweed Rover for demonstrating mission concepts and science measurement techniques. This paper will provide an overview of the prototype design, instrumentation to be accommodated, preliminary test results, and plans for future development and testing of the vehicle.
Using Human Capital Planning to Predict Future Talent Needs
ERIC Educational Resources Information Center
Ruse, Donald; Jansen, Karen
2008-01-01
Human capital planning is an important tool in predicting future talent needs and sustaining organizational excellence over the long term. This article examines the concept of human capital planning and outlines how institutions can use HCP to identify the type and number of talent needed both now and in the future, recognize and prioritize talent…
76 FR 40817 - Implementation of Section 224 of the Act; A National Broadband Plan for Our Future
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
...-50] Implementation of Section 224 of the Act; A National Broadband Plan for Our Future AGENCY... information collection requirements. The Office of Management and Budget (OMB) gave approval for these..., Implementation of Section 224 of the Act; A National Broadband Plan for Our Future. DATES: The final rules...
Ground Test of the Urine Processing Assembly for Accelerations and Transfer Functions
NASA Technical Reports Server (NTRS)
Houston, Janice; Almond, Deborah F. (Technical Monitor)
2001-01-01
This viewgraph presentation gives an overview of the ground test of the urine processing assembly for accelerations and transfer functions. Details are given on the test setup, test data, data analysis, analytical results, and microgravity assessment. The conclusions of the tests include the following: (1) the single input/multiple output method is useful if the data is acquired by tri-axial accelerometers and inputs can be considered uncorrelated; (2) tying coherence with the matrix yields higher confidence in results; (3) the WRS#2 rack ORUs need to be isolated; (4) and future work includes a plan for characterizing performance of isolation materials.
NASA Astrophysics Data System (ADS)
Marlowe, Hannah; McEntaffer, Randall L.; Allured, Ryan; DeRoo, Casey; Miles, Drew M.; Donovan, Benjamin D.; Tutt, James H.; Burwitz, Vadim; Menz, Benedikt; Hartner, Gisela D.; Smith, Randall K.; Günther, Ramses; Yanson, Alex; Vacanti, Giuseppe; Ackermann, Marcelo
2015-05-01
An X-ray spectrograph consisting of aligned, radially ruled off-plane reflection gratings and silicon pore optics (SPO) was tested at the Max Planck Institute for extraterrestrial Physics PANTER X-ray test facility. The SPO is a test module for the proposed Arcus mission, which will also feature aligned off-plane reflection gratings. This test is the first time two off-plane gratings were actively aligned to each other and with a SPO to produce an overlapped spectrum. We report the performance of the complete spectrograph utilizing the aligned gratings module and plans for future development.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gauglitz, Phillip A.; Bontha, Jagannadha R.; Daniel, Richard C.
The Hanford Waste Treatment and Immobilization Plant (WTP) is currently being designed and constructed to pretreat and vitrify a large portion of the waste in the 177 underground waste storage tanks at the Hanford Site. A number of technical issues related to the design of the pretreatment facility (PTF) of the WTP have been identified. These issues must be resolved prior to the U.S. Department of Energy (DOE) Office of River Protection (ORP) reaching a decision to proceed with engineering, procurement, and construction activities for the PTF. One of the issues is Technical Issue T1 - Hydrogen Gas Release frommore » Vessels (hereafter referred to as T1). The focus of T1 is identifying controls for hydrogen release and completing any testing required to close the technical issue. In advance of selecting specific controls for hydrogen gas safety, a number of preliminary technical studies were initiated to support anticipated future testing and to improve the understanding of hydrogen gas generation, retention, and release within PTF vessels. These activities supported the development of a plan defining an overall strategy and approach for addressing T1 and achieving technical endpoints identified for T1. Preliminary studies also supported the development of a test plan for conducting testing and analysis to support closing T1. Both of these plans were developed in advance of selecting specific controls, and in the course of working on T1 it was decided that the testing and analysis identified in the test plan were not immediately needed. However, planning activities and preliminary studies led to significant technical progress in a number of areas. This report summarizes the progress to date from the preliminary technical studies. The technical results in this report should not be used for WTP design or safety and hazards analyses and technical results are marked with the following statement: “Preliminary Technical Results for Planning – Not to be used for WTP Design or Safety Analyses.”« less
SPRE 1 free-piston Stirling engine testing at NASA Lewis Research Center
NASA Technical Reports Server (NTRS)
Cairelli, James E.
1987-01-01
As part of the NASA funded portion of the SP-100 Advanced Technology Program the Space Power Research Engine (SPRE 1) was designed and built to serve as a research tool for evaluation and development of advanced Stirling engine concepts. The SPRE 1 is designed to produce 12.5 kW electrical power when operated with helium at 15 MPa and with an absolute temperature ratio of two. The engine is now under test in a new test facility which was designed and built at NASA Lewis specifically to test the SPRE 1. The SPRE 1, the NASA test facility, the initial SPRE 1 test results, and future SPRE 1 test plans are described.
Test of acoustic tone source and propulsion performance of C8A Buffalo suppressor nozzle
NASA Technical Reports Server (NTRS)
Marrs, C. C.; Harkonen, D. L.; Okeefe, J. V.
1974-01-01
Results are presented for a static acoustic and propulsion performance ground test conducted at the Boeing hot nozzle facility on the C8A Buffalo noise suppressor nozzle. Various methods to remove a nozzle-associated 2000-Hz tone are evaluated. Results of testing this rectangular-array lobed nozzle for propulsion performance and acoustic directivity are reported. Recommendations for future nozzle modifications and further testing are included. Appendix A contains the test plan. Appendix B presents the test log. Appendix C contains plots of the one-third octave sound pressure levels recorded during the test. Appendix D describes the acoustic data recording and reduction systems. The performance data is tabulated in Appendix E.
ERIC Educational Resources Information Center
National Collegiate Software Clearinghouse, Durham, NC.
Over 250 microcomputer software packages, intended for use on MS-DOS machines by scholars and teachers in the humanities and social sciences, are included in this catalog. The clearinghouse's first Macintosh listing is included, with many more Macintosh programs and data sets being planned and tested for future inclusion. Most programs were…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... to measure the quality of the MAF. Test 22 is currently a one-time project scheduled for fiscal year... designed to be kept up-to-date, thereby eliminating the need to develop a completely new address list for future censuses and surveys. The Census Bureau plans to use the MTdb [[Page 66795
Slavery in America: A Thematic Unit Appropriate for Adult Literacy Classrooms. Teacher to Teacher.
ERIC Educational Resources Information Center
White, Lisa
This thematic unit is designed for adult literacy students with at least a third grade reading level. Objectives are tied closely to skills needed for the General Educational Development tests and include computer and workplace skills. Equipped for the Future (EFF) roles and skills are also integrated into the plans. Best practice teaching…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-09
... three-year study released in 2008, revealed that 1-to-1 laptop use was associated with higher test..., such as a laptop, is taken off school grounds, however, applicants are required to cost-allocate the... not. 30. Recent data demonstrates that the widespread availability of wireless laptop computing for...
DSN telemetry system performance with convolutionally code data
NASA Technical Reports Server (NTRS)
Mulhall, B. D. L.; Benjauthrit, B.; Greenhall, C. A.; Kuma, D. M.; Lam, J. K.; Wong, J. S.; Urech, J.; Vit, L. D.
1975-01-01
The results obtained to date and the plans for future experiments for the DSN telemetry system were presented. The performance of the DSN telemetry system in decoding convolutionally coded data by both sequential and maximum likelihood techniques is being determined by testing at various deep space stations. The evaluation of performance models is also an objective of this activity.
Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)
NASA Technical Reports Server (NTRS)
1994-01-01
Astronaut Charles D. (Sam) Gemar, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.
Astronaut Pierre J. Thuot works with Middeck O-Gravity Dynamics Experiment (MODE)
NASA Technical Reports Server (NTRS)
1994-01-01
Astronaut Pierre J. Thuot, mission specialist, works with the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware - contained fluids and (as depicted here) large space structures - planned for future spacecraft.
Parametric analyses of planned flowing uranium hexafluoride critical experiments
NASA Technical Reports Server (NTRS)
Rodgers, R. J.; Latham, T. S.
1976-01-01
Analytical investigations were conducted to determine preliminary design and operating characteristics of flowing uranium hexafluoride (UF6) gaseous nuclear reactor experiments in which a hybrid core configuration comprised of UF6 gas and a region of solid fuel will be employed. The investigations are part of a planned program to perform a series of experiments of increasing performance, culminating in an approximately 5 MW fissioning uranium plasma experiment. A preliminary design is described for an argon buffer gas confined, UF6 flow loop system for future use in flowing critical experiments. Initial calculations to estimate the operating characteristics of the gaseous fissioning UF6 in a confined flow test at a pressure of 4 atm, indicate temperature increases of approximately 100 and 1000 K in the UF6 may be obtained for total test power levels of 100 kW and 1 MW for test times of 320 and 32 sec, respectively.
Advanced Visualization of Experimental Data in Real Time Using LiveView3D
NASA Technical Reports Server (NTRS)
Schwartz, Richard J.; Fleming, Gary A.
2006-01-01
LiveView3D is a software application that imports and displays a variety of wind tunnel derived data in an interactive virtual environment in real time. LiveView3D combines the use of streaming video fed into a three-dimensional virtual representation of the test configuration with networked communications to the test facility Data Acquisition System (DAS). This unified approach to real time data visualization provides a unique opportunity to comprehend very large sets of diverse forms of data in a real time situation, as well as in post-test analysis. This paper describes how LiveView3D has been implemented to visualize diverse forms of aerodynamic data gathered during wind tunnel experiments, most notably at the NASA Langley Research Center Unitary Plan Wind Tunnel (UPWT). Planned future developments of the LiveView3D system are also addressed.
2001-08-06
The test of twin Linear Aerospike XRS-2200 engines, originally built for the X-33 program, was performed on August 6, 2001 at NASA's Sternis Space Center, Mississippi. The engines were fired for the planned 90 seconds and reached a planned maximum power of 85 percent. NASA's Second Generation Reusable Launch Vehicle Program , also known as the Space Launch Initiative (SLI), is making advances in propulsion technology with this third and final successful engine hot fire, designed to test electro-mechanical actuators. Information learned from this hot fire test series about new electro-mechanical actuator technology, which controls the flow of propellants in rocket engines, could provide key advancements for the propulsion systems for future spacecraft. The Second Generation Reusable Launch Vehicle Program, led by NASA's Marshall Space Flight Center in Huntsville, Alabama, is a technology development program designed to increase safety and reliability while reducing costs for space travel. The X-33 program was cancelled in March 2001.
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-03-06
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-01-31
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
Tank 241-AZ-101 Mixer Pump Test Vapor Sampling and Analysis Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
TEMPLETON, A.M.
2000-04-10
This sampling and analysis plan (SAP) identifies characterization objectives pertaining to sample collection, laboratory analytical evaluation, and reporting requirements for vapor samples obtained during the operation of mixer pumps in tank 241-AZ-101. The primary purpose of the mixer pump test (MPT) is to demonstrate that the two 300 horsepower mixer pumps installed in tank 241-AZ-101 can mobilize the settled sludge so that it can be retrieved for treatment and vitrification. Sampling will be performed in accordance with Tank 241-AZ-101 Mixer Pump Test Data Quality Objective (Banning 1999) and Data Quality Objectives for Regulatory Requirements for Hazardous and Radioactive Air Emissionsmore » Sampling and Analysis (Mulkey 1999). The sampling will verify if current air emission estimates used in the permit application are correct and provide information for future air permit applications.« less
Performance Testing of Yardney Li-Ion Cells and Batteries in Support of Future NASA Missions
NASA Technical Reports Server (NTRS)
Smart, M. C.; Ratnakumar, B. V.; Whitcanack, L. D.; Puglia, F. J.; Santee, S.; Gitzendanner, R.
2009-01-01
NASA requires lightweight rechargeable batteries for future missions to Mars and the outer planets that are capable of operating over a wide range of temperatures, with high specific energy and energy densities. Due to the attractive performance characteristics, Li-ion batteries have been identified as the battery chemistry of choice for a number of future applications. For example, JPL is planning to launch another unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than five years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar Li-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. In addition to future missions to Mars, Li-ion technology is attractive for a number of other future NASA applications which require high specific energy, rechargeable batteries. To ascertain the viability of using Li-ion batteries for these applications, a number of performance validation tests have been performed on both Yardney cells and batteries of various sizes. These tests include mission simulation tests, charge and discharge rate characterization testing, cycle life testing under various conditions, and storage testing.
Future planning in preschool children.
Moffett, Lillie; Moll, Henrike; FitzGibbon, Lily
2018-05-01
The capacity to plan ahead and provide the means for future ends is an important part of human practical reasoning. When this capacity develops in ontogeny is the matter of an ongoing debate. In this study, 4- and 5-year-olds performed a future planning task in which they had to create the means (a picture of a particular object, e.g., a banana) that was necessary to address a future end (of completing a game in which such a picture was missing). Children of both ages drew more targets than children in a control condition in which there was no future end to be pursued. Along with prior findings, the results suggest a major progression in children's future thinking between 3 and 5 years. Our findings expand on prior knowledge by showing that young children cannot only identify the probate means to future ends but determine such ends and create the means to achieve them, thus offering compelling evidence for future planning. (PsycINFO Database Record (c) 2018 APA, all rights reserved).
Environmental impact studies for gas hydrate production test in the Ulleung Basin, East Sea of Korea
NASA Astrophysics Data System (ADS)
Ryu, Byong-Jae
2017-04-01
To develop potential future energy resources, the Korean National Gas Hydrate Program has been carried out since 2005. The program has been supported by the Ministry of Trade, Industry and Energy (MOTIE), and carried out by the Korea Institute of Geoscience and Mineral Resources (KIGAM), the Korea Gas Corporation (KOGAS) and the Korea National Oil Corporation (KNOC) under the management of Gas Hydrate R&D Organization (GHDO). As a part of this national program, geophysical surveys, geological studies on gas hydrates and two deep drilling expeditions were performed. Gas hydrate-bearing sand layers suitable for production using current technologies were found during the Second Ulleung Basin Gas Hydrate Drilling Expedition (UBGH2) in 2010. Environmental impact studies (EIS) also have been carried out since 2012 by KIGAM in cooperation with domestic and foreign universities and research organizations to ensure safe production test that will be performed in near future. The schedule of production test is being planned. The EIS includes assessment of environmental risks, examination on domestic environmental laws related with production test, collection of basic oceanographic information, and baseline and monitoring surveys. Oceanographic information and domestic environmental laws are already collected and analyzed. Baseline survey has been performed using the in-house developed system, KIGAM Seafloor Observation System (KISOS) since 2013. It will also be performed. R/V TAMHAE II of KIGAM used for KISOS operation. As a part of this EIS, pseudo-3D Chirp survey also was carried out in 2014 to determine the development of fault near the potential testing site. Using KIGAM Seafloor Monitoring System (KIMOS), monitoring survey is planned to be performed from three month before production test to three months after production test. The geophysical survey for determining the change of gas hydrate reservoirs and production-efficiency around the production well would also be conducted before and after the production test. KIMOS will be developed as the planning that was drawn up already. A period for monitoring survey and geophysical survey type, such as AUV or EM surveys will be decided according to the budget.
Taggart, Laurence; Truesdale-Kennedy, Maria; Ryan, Assumpta; McConkey, Roy
2012-09-01
Planning for the future care of adults with an intellectual disability after the main family carer ceases their care, continues to be a sensitive and difficult time posing challenges for service providers internationally. Limited research has been undertaken on this topic because until recently, people with intellectual disability usually pre-deceased their parents. This study examined ageing carers' preferences for future care and the support systems required to make such future plans. The study was conducted in one region of the United Kingdom with a high proportion of family carers. A mixed methods design was employed. In Stage 1, a structured questionnaire was used to collate information on the health, caregiving demands and future planning preferences of 112 parent and sibling carers; aged 60-94 years. In Stage 2, 19 in-depth semistructured interviews were undertaken with a sample of carers to explore a range of issues around future planning. Over half of the carers were lone carers, mainly female, with many reporting a wide range of health problems. A third of these carers reported that their caregiving resulted in high levels of anxiety. The main preference of the carers was for the person to remain in the family home, with either the family and/or paid staff to support them. A minority of parent carers preferred the person to move into the home of a sibling, although some favoured the person moving to a residential facility with other people with intellectual disabilities. The majority of carers did not want their relative to move into an older people's residential/nursing facility. In the qualitative data, four main themes were identified around future planning: unremitting apprehension, the extent of planning, obstacles encountered and solutions for future planning. Avoidance, lack of guidance and a lack of appropriate residential provision were cited as obstacles to making future plans compounded by the emotional upset experienced by carers in thinking about the future. Findings of this study clearly identify the emotional, informational and practical supports required by these ageing family carers. These findings have national and international relevance in influencing how governments and service providers support parent and sibling carers to proactively plan for the future, and in the development of both in-home and out-of-home options when a family carer can no longer provide care. This is more urgent than ever given the growing numbers of older persons with intellectual disabilities in future decades.
DOT National Transportation Integrated Search
2009-07-08
The 2009 Indiana Rail Plan was developed as part of the Indiana Multimodal Freight and Mobility Plan to direct the State of Indianas future freight and passenger rail policy, provide a framework to guide future decisions regarding rail system inve...
Strategic Planning: Shaping Future Success
2016-09-01
fielding, the PM may also be planning for future increments , sustainment and other long-term ef- forts. Strategic planning can help the PM position these...introduced the Planning, Programming, and Budgeting System (PPBS) to the DoD. Prior to that, the DoD’s budget - ing focused on areas such as overhead
Enzmann, Dieter R; Beauchamp, Norman J; Norbash, Alexander
2011-03-01
In facing future developments in health care, scenario planning offers a complementary approach to traditional strategic planning. Whereas traditional strategic planning typically consists of predicting the future at a single point on a chosen time horizon and mapping the preferred plans to address such a future, scenario planning creates stories about multiple likely potential futures on a given time horizon and maps the preferred plans to address the multiple described potential futures. Each scenario is purposefully different and specifically not a consensus worst-case, average, or best-case forecast; nor is scenario planning a process in probabilistic prediction. Scenario planning focuses on high-impact, uncertain driving forces that in the authors' example affect the field of radiology. Uncertainty is the key concept as these forces are mapped onto axes of uncertainty, the poles of which have opposed effects on radiology. One chosen axis was "market focus," with poles of centralized health care (government control) vs a decentralized private market. Another axis was "radiology's business model," with one pole being a unified, single specialty vs a splintered, disaggregated subspecialty. The third axis was "technology and science," with one pole representing technology enabling to radiology vs technology threatening to radiology. Selected poles of these axes were then combined to create 3 scenarios. One scenario, termed "entrepreneurialism," consisted of a decentralized private market, a disaggregated business model, and threatening technology and science. A second scenario, termed "socialized medicine," had a centralized market focus, a unified specialty business model, and enabling technology and science. A third scenario, termed "freefall," had a centralized market focus, a disaggregated business model, and threatening technology and science. These scenarios provide a range of futures that ultimately allow the identification of defined "signposts" that can suggest which basic features among the "possible futures" are playing out. Scenario planning provides for the implementation of appropriate constructed strategic responses. Scenarios allow for a pre-prepared game plan available for ready use as the future unfolds. They allow a deliberative response rather than a hastily constructed, urgent response. Copyright © 2011 American College of Radiology. Published by Elsevier Inc. All rights reserved.
What Were They Thinking? Reducing Sunk-Cost Bias in a Life-Span Sample
Strough, JoNell; Bruine de Bruin, Wändi; Parker, Andrew M.; Karns, Tara; Lemaster, Philip; Pichayayothin, Nipat; Delaney, Rebecca; Stoiko, Rachel
2016-01-01
We tested interventions to reduce “sunk-cost bias,” the tendency to continue investing in failing plans even when those plans have soured and are no longer rewarding. We showed members of a national U.S. life-span panel a hypothetical scenario about a failing plan that was halfway complete. Participants were randomly assigned to an intervention to focus on how to improve the situation, an intervention to focus on thoughts and feelings, or a no-intervention control group. First, we found that the thoughts and feelings intervention reduced sunk-cost bias in decisions about project completion, as compared to the improvement intervention and the no-intervention control. Second, older age was associated with greater willingness to cancel the failing plan across all three groups. Third, we found that introspection processes helped to explain the effectiveness of the interventions. Specifically, the larger reduction in sunk-cost bias as observed in the thoughts and feelings intervention (vs. the improvement intervention) was associated with suppression of future-oriented thoughts of eventual success, and with suppression of augmentations of the scenario that could make it seem reasonable to continue the plan. Fourth, we found that introspection processes were related to age differences in decisions. Older people were less likely to mention future-oriented thoughts of eventual success associated with greater willingness to continue the failing plan. We discuss factors to consider when designing interventions for reducing sunk-cost bias. PMID:27831712
Can We "Future-Proof" Marine Conservation Planning?
NASA Astrophysics Data System (ADS)
Pinsky, M. L.; Rogers, L. A.
2016-02-01
Marine conservation and marine spatial planning strategies worldwide are designed around biogeographic patterns, often under the assumption that these patterns are relatively stable. With climate change, however, distributions are shifting rapidly as species seek more suitable conditions. Here, we use distribution projections from 2006-2100 for 360 marine species in North America to evaluate the effectiveness of the current marine protected area (MPA) network and to test climate-ready planning approaches. We consider both expected community changes and the uncertainty in those projections. We find that existing MPAs are likely to lose more species over the coming century than other locations on the continental shelf. We also find substantial shifts in the location of high- and low-value regions, which can complicate conservation planning. However, planning portfolios can be developed that perform much better in the face of changes expected over the coming century. The theory and practice of marine spatial planning and marine conservation can be substantially more responsive to our dynamic ocean.
ERIC Educational Resources Information Center
Kelly, Diana K.
The rate of the change now occurring outside of community colleges has made long-range planning an especially difficult task. Futures research, which attempts to forecast future scenarios by studying societal, economic, and demographic trends, can be used effectively to facilitate the institutional planning process by anticipating both internal…
Educational Planning for the Future Development of Pasco-Hernando Community College.
ERIC Educational Resources Information Center
McGuffey, C. W.; And Others
The purpose of this study was to develop a long-range educational plan for the future development and expansion of the current program and facilities of Pasco-Hernando Community College. An analysis has been made of available data and related information as a basis for the preparation of a generalized plan to guide the future development of the…
ERIC Educational Resources Information Center
Sayers, Nicola
2011-01-01
Scenario planning is a tool which can help organisations and people to think about, and plan for, the long-term future. In basic terms, it involves creating a number of in-depth scenarios (stories), each of which tells of a different possible future for an organisation or issue, and considering how each different future might influence…
2016-02-03
Response Cutter program and plans for its upcoming Offshore Patrol Cutter program, that the Coast Guard has matured its acquisition process. The process to...Cutter and Offshore Patrol Cutter programs. GAO reviewed these two programs in June 2014 (GAO-14-450) and April 2015 (GAO- 15-171SP) and also...Government Accountability Office areas of competition and the schedule for initial testing. Furthermore, as the $12 billion Offshore Patrol Cutter program
Developing future plant experiments for spaceflight
NASA Technical Reports Server (NTRS)
Dreschel, T. W.; Brown, C. S.; Hinkle, C. R.; Sager, J. C.; Knott, W. M.
1990-01-01
Experiments are described which were designed to support the constructing and using clinostats for studies of microgravity effects and for measuring photosynthesis and respiration in plants in clinostat experiments. Particular attention is given to the development and testing a clinostat for rotating the Space Shuttle Mid-Deck Locker Plant Growth Unit (PGU), a sealed chamber for plan growth and gas exchange measurements on a clinostat, and a porous tube plant nutrient delivery system for the PGU. Design diagrams of these items are presented together with the results of tests.
Rocketdyne Safety Algorithm: Space Shuttle Main Engine Fault Detection
NASA Technical Reports Server (NTRS)
Norman, Arnold M., Jr.
1994-01-01
The Rocketdyne Safety Algorithm (RSA) has been developed to the point of use on the TTBE at MSFC on Task 4 of LeRC contract NAS3-25884. This document contains a description of the work performed, the results of the nominal test of the major anomaly test cases and a table of the resulting cutoff times, a plot of the RSA value vs. time for each anomaly case, a logic flow description of the algorithm, the algorithm code, and a development plan for future efforts.
Baseband processor development/test performance for 30/20 GHz SS-TDMA communication system
NASA Technical Reports Server (NTRS)
Brown, L.; Sabourin, D.; Attwood, S.
1984-01-01
The baseband processor (BBP) development for the 30/20 GHz Satellite Communication System is described. The SS-TDMA concept for future satellite communications is reviewed, describing the overall system, the satellite payload, and the frequency plan. A brief general description of the BBP is given, and the proof-of-concept model of the BBP is summarized. Key technologies and custom LSI developed for the BBP are listed. Finally, key technology developments and test data are reported for the BBP.
EMMA: The expert system for munition maintenance
NASA Technical Reports Server (NTRS)
Mullins, Barry E.
1988-01-01
Expert Missile Maintenance Aid (EMMA) is a first attempt to enhance maintenance of the tactical munition at the field and depot level by using artificial intelligence (AI) techniques. The ultimate goal of EMMA is to help a novice maintenance technician isolate and diagnose electronic, electromechanical, and mechanical equipment faults to the board/chassis level more quickly and consistently than the best human expert using the best currently available automatic test equipment (ATE). To this end, EMMA augments existing ATE with an expert system that captures the knowledge of design and maintenance experts. The EMMA program is described, including the evaluation of field-level expert system prototypes, the description of several study tasks performed during EMMA, and future plans for a follow-on program. This paper will briefly address several study tasks performed during EMMA. The paper concludes with a discussion of future plans for a follow-on program and other areas of concern.
Wykes, Til; Reeder, Clare; Huddy, Vyv; Taylor, Rumina; Wood, Helen; Ghirasim, Natalia; Kontis, Dimitrios; Landau, Sabine
2012-01-01
Background Cognitive remediation (CRT) affects functioning but the extent and type of cognitive improvements necessary are unknown. Aim To develop and test models of how cognitive improvement transfers to work behaviour using the data from a current service. Method Participants (N49) with a support worker and a paid or voluntary job were offered CRT in a Phase 2 single group design with three assessments: baseline, post therapy and follow-up. Working memory, cognitive flexibility, planning and work outcomes were assessed. Results Three models were tested (mediation — cognitive improvements drive functioning improvement; moderation — post treatment cognitive level affects the impact of CRT on functioning; moderated mediation — cognition drives functioning improvements only after a certain level is achieved). There was evidence of mediation (planning improvement associated with improved work quality). There was no evidence that cognitive flexibility (total Wisconsin Card Sorting Test errors) and working memory (Wechsler Adult Intelligence Scale III digit span) mediated work functioning despite significant effects. There was some evidence of moderated mediation for planning improvement if participants had poorer memory and/or made fewer WCST errors. The total CRT effect on work quality was d = 0.55, but the indirect (planning-mediated CRT effect) was d = 0.082 Conclusion Planning improvements led to better work quality but only accounted for a small proportion of the total effect on work outcome. Other specific and non-specific effects of CRT and the work programme are likely to account for some of the remaining effect. This is the first time complex models have been tested and future Phase 3 studies need to further test mediation and moderated mediation models. PMID:22503640
Advanced Space Suit PLSS 2.0 Cooling Loop Evaluation and PLSS 2.5 Recommendations
NASA Technical Reports Server (NTRS)
Steele, John; Quinn, Greg; Campbell, Colin; Makinen, Janice; Watts, Carly; Westheimer, David
2016-01-01
From 2012 to 2015 The NASA/JSC AdvSS (Advanced Space Suit) PLSS (Portable Life Support Subsystem) team, with support from UTC Aerospace Systems, performed the build-up, packaging and testing of PLSS 2.0. One aspect of that testing was the evaluation of the long-term health of the water cooling circuit and the interfacing components. Periodic and end-of-test water, residue and hardware analyses provided valuable information on the status of the water cooling circuit, and the approaches that would be necessary to enhance water cooling circuit health in the future. The evaluated data has been consolidated, interpreted and woven into an action plan for the maintenance of water cooling circuit health for the planned FY (fiscal year) 2016 through FY 2018 PLSS 2.5 testing. This paper provides an overview of the PLSS 2.0 water cooling circuit findings and the associated steps to be taken in that regard for the PLSS 2.5.
Human Factors Evaluations of Two-Dimensional Spacecraft Conceptual Layouts
NASA Technical Reports Server (NTRS)
Kennedy, Kriss J.; Toups, Larry D.; Rudisill, Marianne
2010-01-01
Much of the human factors work done in support of the NASA Constellation lunar program has been with low fidelity mockups. These volumetric replicas of the future lunar spacecraft allow researchers to insert test subjects from the engineering and astronaut population and evaluate the vehicle design as the test subjects perform simulations of various operational tasks. However, lunar outpost designs must be evaluated without the use of mockups, creating a need for evaluation tools that can be performed on two-dimension conceptual spacecraft layouts, such as floor plans. A tool based on the Cooper- Harper scale was developed and applied to one lunar scenario, enabling engineers to select between two competing floor plan layouts. Keywords: Constellation, human factors, tools, processes, habitat, outpost, Net Habitable Volume, Cooper-Harper.
LiveView3D: Real Time Data Visualization for the Aerospace Testing Environment
NASA Technical Reports Server (NTRS)
Schwartz, Richard J.; Fleming, Gary A.
2006-01-01
This paper addresses LiveView3D, a software package and associated data visualization system for use in the aerospace testing environment. The LiveView3D system allows researchers to graphically view data from numerous wind tunnel instruments in real time in an interactive virtual environment. The graphical nature of the LiveView3D display provides researchers with an intuitive view of the measurement data, making it easier to interpret the aerodynamic phenomenon under investigation. LiveView3D has been developed at the NASA Langley Research Center and has been applied in the Langley Unitary Plan Wind Tunnel (UPWT). This paper discusses the capabilities of the LiveView3D system, provides example results from its application in the UPWT, and outlines features planned for future implementation.
Eggers, Sander M; Taylor, Myra; Sathiparsad, Reshma; Bos, Arjan Er; de Vries, Hein
2015-11-01
Despite its popularity, few studies have assessed the temporal stability and cross-lagged effects of the Theory of Planned Behavior factors: Attitude, subjective norms and self-efficacy. For this study, 298 adolescent learners from KwaZulu-Natal, South Africa, filled out a Theory of Planned Behavior questionnaire on teenage pregnancy at baseline and after 6 months. Structural equation modeling showed that there were considerable cross-lagged effects between attitude and subjective norms. Temporal stability was moderate with test-retest correlations ranging from 0.37 to 0.51 and the model was able to predict intentions to have safe sex (R2 = 0.69) Implications for practice and future research are discussed. © The Author(s) 2013.
The ITER bolometer diagnostic: Status and plansa)
NASA Astrophysics Data System (ADS)
Meister, H.; Giannone, L.; Horton, L. D.; Raupp, G.; Zeidner, W.; Grunda, G.; Kalvin, S.; Fischer, U.; Serikov, A.; Stickel, S.; Reichle, R.
2008-10-01
A consortium consisting of four EURATOM Associations has been set up to develop the project plan for the full development of the ITER bolometer diagnostic and to continue urgent R&D activities. An overview of the current status is given, including detector development, line-of-sight optimization, performance analysis as well as the design of the diagnostic components and their integration in ITER. This is complemented by the presentation of plans for future activities required to successfully implement the bolometer diagnostic, ranging from the detector development over diagnostic design and prototype testing to RH tools for calibration.
Test Planning Approach and Lessons
NASA Technical Reports Server (NTRS)
Parkinson, Douglas A.; Brown, Kendall K.
2004-01-01
As NASA began technology risk reduction activities and planning for the next generation launch vehicle under the Space Launch Initiative (SLI), now the Next Generation Launch Technology (NGLT) Program, a review of past large liquid rocket engine development programs was performed. The intent of the review was to identify any significant lessons from the development testing programs that could be applied to current and future engine development programs. Because the primary prototype engine in design at the time of this study was the Boeing-Rocketdyne RS-84, the study was slightly biased towards LOX/RP-1 liquid propellant engines. However, the significant lessons identified are universal. It is anticipated that these lessons will serve as a reference for test planning in the Engine Systems Group at Marshall Space Flight Center (MSFC). Towards the end of F-1 and J-2 engine development testing, NASA/MSFC asked Rocketdyne to review those test programs. The result was a document titled, Study to Accelerate Development by Test of a Rocket Engine (R-8099). The "intent (of this study) is to apply this thinking and learning to more efficiently develop rocket engines to high reliability with improved cost effectivenes" Additionally, several other engine programs were reviewed - such as SSME, NSTS, STME, MC-1, and RS-83- to support or refute the R-8099. R-8099 revealed two primary lessons for test planning, which were supported by the other engine development programs. First, engine development programs can benefit from arranging the test program for engine system testing as early as feasible. The best test for determining environments is at the system level, the closest to the operational flight environment. Secondly, the component testing, which tends to be elaborate, should instead be geared towards reducing risk to enable system test. Technical risk can be reduced at the component level, but the design can only be truly verified and validated after engine system testing.
Predicting change over time in career planning and career exploration for high school students.
Creed, Peter A; Patton, Wendy; Prideaux, Lee-Ann
2007-06-01
This study assessed 166 high school students in Grade 8 and again in Grade 10. Four models were tested: (a) whether the T1 predictor variables (career knowledge, indecision, decision-making self efficacy, self-esteem, demographics) predicted the outcome variable (career planning/exploration) at T1; (b) whether the T1 predictor variables predicted the outcome variable at T2; (c) whether the T1 predictor variables predicted change in the outcome variable from T1-T2; and (d) whether changes in the predictor variables from T1-T2 predicted change in the outcome variable from T1-T2. Strong associations (R(2)=34%) were identified for the T1 analysis (confidence, ability and paid work experience were positively associated with career planning/exploration). T1 variables were less useful predictors of career planning/exploration at T2 (R(2)=9%; having more confidence at T1 was associated with more career planning/exploration at T2) and change in career planning/exploration from T1-T2 (R(2)=11%; less confidence and no work experience were associated with change in career planning/exploration from T1-T2). When testing effect of changes in predictor variables predicting changes in outcome variable (R(2)=22%), three important predictors, indecision, work experience and confidence, were identified. Overall, results indicated important roles for self-efficacy and early work experiences in current and future career planning/exploration of high school students.
Effective Planning of the Future of the Arctic
NASA Astrophysics Data System (ADS)
Sentsov, A.; Bolsunovskaya, Yu; Bolsunovskaya, L.
2014-08-01
The problems of the Arctic region have become the most important ones in the world. Political risks hinder the industrial development of the region. This paper addresses the problem of planning and modeling the future of this region. It presents the problems of developing a model of the future due to the ideologies and strategies of two main actors in the Arctic, the United States and the Russian Federation. The effects of a bipolar perception of the future of the region and of the whole world are shown. A model of the effective planning of the future of the Arctic region is proposed.
Planning for the Future: The Leadership Role of the State Library Agencies.
ERIC Educational Resources Information Center
Fletcher, Patricia T.
1990-01-01
Discusses the strategic planning role of state library agencies for information resources management (IRM) and presents data from a study on IRM in the 50 state governments. Trends in state plans are identified, the strategic planning process is examined, and challenges for the future are discussed. (20 references) (LRW)
Wired for the Future: Developing Your Library Technology Plan.
ERIC Educational Resources Information Center
Mayo, Diane; Nelson, Sandra
A technology plan provides a blueprint against which to measure new technologies and applications, assess future needs, and allocate resources to balance technology with the needs of users and staff. This book is a comprehensive and practical guide for librarians preparing a technology plan. The book is divided into five planning steps, each of…
A mission planning concept and mission planning system for future manned space missions
NASA Technical Reports Server (NTRS)
Wickler, Martin
1994-01-01
The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.
The ESA activities on future launchers
NASA Technical Reports Server (NTRS)
Pfeffer, H.
1984-01-01
A future launcher development scenario depends on many assumptions, such as the impetus provided by the probability of future missions, and the political willingness of member states to undertake future developments. Because of the long timescale implied by a coherent launcher development, a step-wise approach within an overall future launcher development plan appears essential. The definition of development steps allows the launcher developments to be adapted to the driving external forces, so that no possible opportunity to Europe in the space launch business is missed out because of improper planning on the absence of a long term goal. The launcher senario, to be presented in 1985, forms part of Europe's overall STS plan for the future. This overall STS plan is one product of the complete STS LTPP, a first draft of which should exist by 1985, and which will be updated regularly to take into account the changing political and economic perspectives.
Planning for Desperate Climate Intervention: can it Make Sense?
NASA Astrophysics Data System (ADS)
Duncan, Robert
2014-07-01
The three National Academies of the United States, working together, authored a comprehensive report in 1992 titled: Policy Implications of Greenhouse Warming: Mitigation, Adaptation, and the Science Base. The authors discussed various possible methods of geoengineering to mitigate the adverse climate effects of the slow, steady buildup of greenhouse gasses in the Earth's atmosphere. Subsequently far less expensive, clever designs were developed by inventors such as Bill Gates and his collaborators, and these have been patented. Many of the techniques in this geoengineering proposition were commonly considered as methods of selectively polluting the upper atmosphere to block the solar luminosity, and hence they met with staunch resistance from the international scientific community. At the time, these geoengineering approaches were proposed as a method of countering the slow steady increase of the earth's temperature that was assumed to be a consequence of the increase in concentration of atmospheric molecules that contain carbon, such as CO2 and CH4. Such intentional intervention in a system as complex as the earth's atmosphere was considered by most scientists, including the authors, as reckless. Within this paper, we propose that the less expensive of these geoengineering plans be reconsidered, but that such a system never be deployed or tested at scale unless a genuine climate runaway condition arises in the future. The more economically compelling approaches should be further tested at the `lab bench' level, and in small laboratory-scale tests, and simulations. A comprehensive plan should be developed to manufacture the required materials at scale and to finalize the design of the necessary system, but no such deployment should be entered into at this time. The many risks of an intense, sudden release of greenhouse gasses, mainly methane and carbon dioxide from geologic sources, are reviewed briefly herein. We consider it only prudent to develop an economical and viable geoengineered plan to block part of the solar luminosity on the Earth, given the small but credible risk of a global climate runaway situation in the future.
The GTC: a convenient test bench for ELT demonstrations
NASA Astrophysics Data System (ADS)
Rodriguez Espinosa, Jose M.; Hammersley, Peter L.; Martinez-Roger, Carlos
2004-07-01
The Gran Telescopio Canarias (GTC) is, being assembled at the Observatorio del Roque de los Muchachos (ORM) in the island of La Palma. First light is expected for early 2005 with the first science observations late in 2005. The GTC, being a segmented primary mirror telescope, could be employed for testing several technological aspects relevant to the future generation of Extremely Large Telescopes (ELT). In the short term, the mass production of aespheric mirror segments can be examined in detail and improvements made along the way, or planned for the future. Indeed the GTC segments are now entering into a chain production scheme. Later on, different strategies for the control aspects of the primary mirror can be explored to optimize the optical performance of segmented telescopes. Moreover, the entire GTC active optics can offer a learning tool for testing various strategies and their application to ELTs.
Water management in Egypt for facing the future challenges
Omar, Mohie El Din M.; Moussa, Ahmed M.A.
2016-01-01
The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025. PMID:27222745
Water management in Egypt for facing the future challenges.
Omar, Mohie El Din M; Moussa, Ahmed M A
2016-05-01
The current water shortage in Egypt is 13.5 Billion cubic meter per year (BCM/yr) and is expected to continuously increase. Currently, this water shortage is compensated by drainage reuse which consequently deteriorates the water quality. Therefore, this research was commenced with the objective of assessing different scenarios for 2025 using the Water Evaluation and Planning (WEAP) model and by implementing different water sufficiency measures. Field data were assembled and analyzed, and different planning alternatives were proposed and tested in order to design three future scenarios. The findings indicated that water shortage in 2025 would be 26 BCM/yr in case of continuation of current policies. Planning alternatives were proposed to the irrigation canals, land irrigation timing, aquatic weeds in waterways and sugarcane areas in old agricultural lands. Other measures were suggested to pumping rates of deep groundwater, sprinkler and drip irrigation systems in new agricultural lands. Further measures were also suggested to automatic daily surveying for distribution leak and managing the pressure effectively in the domestic and industrial water distribution systems. Finally, extra measures for water supply were proposed including raising the permitted withdrawal limit from deep groundwater and the Nubian aquifer and developing the desalination resource. The proposed planning alternatives would completely eliminate the water shortage in 2025.
NASA Technical Reports Server (NTRS)
Wolfe, R. R.
1975-01-01
Space servicing automated payloads was studied for potential cost benefits for future payload operations. Background information is provided on space servicing in general, and on a pilot flight test program in particular. An fight test is recommended to demonstrate space servicing. An overall program plan is provided which builds upon the pilot program through an interim servicing capability. A multipayload servicing concept for the time when the full capability tug becomes operational is presented. The space test program is specifically designed to provide low-cost booster vehicles and a flight test platform for several experiments on a single flight.
Definition of ground test for Large Space Structure (LSS) control verification
NASA Technical Reports Server (NTRS)
Waites, H. B.; Doane, G. B., III; Tollison, D. K.
1984-01-01
An overview for the definition of a ground test for the verification of Large Space Structure (LSS) control is given. The definition contains information on the description of the LSS ground verification experiment, the project management scheme, the design, development, fabrication and checkout of the subsystems, the systems engineering and integration, the hardware subsystems, the software, and a summary which includes future LSS ground test plans. Upon completion of these items, NASA/Marshall Space Flight Center will have an LSS ground test facility which will provide sufficient data on dynamics and control verification of LSS so that LSS flight system operations can be reasonably ensured.
LArIAT: Worlds First Pion-Argon Cross-Section
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamilton, Pip
2016-11-02
The LArIAT experiment has performed the world's first measurement of the total charged-current pion cross-section on an argon target, using the repurposed ArgoNeuT detector in the Fermilab test beam. Presented here are the results of that measurement, along with an overview of the LArIAT experiment and details of the LArIAT collaboration's plans for future measurements.
Numerical Simulation of Ground Coupling of Low Yield Nuclear Detonation
2010-06-01
Without nuclear testing, advanced simulation and experimental facilities, such as the National Ignition Facility ( NIF ), are essential to assuring...in planning future experimental work at NIF . 15. NUMBER OF PAGES 93 14. SUBJECT TERMS National Ignition Facility, GEODYN, Ground Coupling...simulation and experimental facilities, such as the National Ignition Facility ( NIF ), are essential to assuring safety, reliability, and effectiveness
Astronaut Thuot and Gemar work with Middeck O-Gravity Dynamics Experiment (MODE)
NASA Technical Reports Server (NTRS)
1994-01-01
Astronauts Pierre J. Thuot (top) and Charles D. (Sam) Gemar show off the Middeck O-Gravity Dynamics Experiment (MODE) aboard the Earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the non-linear gravity-dependent behavior of two types of space hardware - large space structures (as depicted here) and contained fluids - planned for future spacecraft.
Kozar, Mark D.; Kahle, Sue C.
2013-01-01
This report documents the standard procedures, policies, and field methods used by the U.S. Geological Survey’s (USGS) Washington Water Science Center staff for activities related to the collection, processing, analysis, storage, and publication of groundwater data. This groundwater quality-assurance plan changes through time to accommodate new methods and requirements developed by the Washington Water Science Center and the USGS Office of Groundwater. The plan is based largely on requirements and guidelines provided by the USGS Office of Groundwater, or the USGS Water Mission Area. Regular updates to this plan represent an integral part of the quality-assurance process. Because numerous policy memoranda have been issued by the Office of Groundwater since the previous groundwater quality assurance plan was written, this report is a substantial revision of the previous report, supplants it, and contains significant additional policies not covered in the previous report. This updated plan includes information related to the organization and responsibilities of USGS Washington Water Science Center staff, training, safety, project proposal development, project review procedures, data collection activities, data processing activities, report review procedures, and archiving of field data and interpretative information pertaining to groundwater flow models, borehole aquifer tests, and aquifer tests. Important updates from the previous groundwater quality assurance plan include: (1) procedures for documenting and archiving of groundwater flow models; (2) revisions to procedures and policies for the creation of sites in the Groundwater Site Inventory database; (3) adoption of new water-level forms to be used within the USGS Washington Water Science Center; (4) procedures for future creation of borehole geophysics, surface geophysics, and aquifer-test archives; and (5) use of the USGS Multi Optional Network Key Entry System software for entry of routine water-level data collected as part of long-term water-level monitoring networks.
NASA electronic message experiment and study: Detailed test plans
NASA Technical Reports Server (NTRS)
1979-01-01
A methodology for evaluating the utility of high speed digital facsimile as a component of the projected NASA-wide electronic message network is presented. Equipment checkout, operator familiarization, pretest calibration, and the development of procedures are addressed. An experimental test program of the facsimile message service which will carry duplicates of the actual messages sent by other means is highlighted. Also, an operational test program during which messages will be sent on a regular basis in order to accumulate the information that will be used to evaluate system performance and project future growth is described.
SNC’s Dream Chaser Achieves Successful Free Flight at NASA Armstrong
2017-11-17
Sierra Nevada Corporation's Dream Chaser® spacecraft underwent a successful free-flight test on November 11, 2017 at NASA’s Armstrong Flight Research Center, Edwards, California. The test verified and validated the performance of the Dream Chaser in the critical final approach and landing phase of flight, meeting expected models for a future return from the International Space Station. The full-scale Dream Chaser test vehicle was lifted to 12,400 feet altitude by a 234-UT Chinook helicopter, released and flew a pre-planned flight path ending with a successful autonomous landing.
Creating a future for nursing through interactive planning at the bedside.
Foust, J B
1994-01-01
Interactive planning is introduced as an approach to planning amidst change that may be useful in clinical practice. The underlying principles and unique characteristics of interactive planning are presented. In addition, clinical studies suggesting its inherent presence in nursing practice are identified. Effective care planning as a developmental process provides nurses with a favorable opportunity to both contribute to individualized patient care and create our own professional future.
Blum, Meike; Distl, Ottmar
2014-01-01
In the present study, breeding values for canine congenital sensorineural deafness, the presence of blue eyes and patches have been predicted using multivariate animal models to test the reliability of the breeding values for planned matings. The dataset consisted of 6669 German Dalmatian dogs born between 1988 and 2009. Data were provided by the Dalmatian kennel clubs which are members of the German Association for Dog Breeding and Husbandry (VDH). The hearing status for all dogs was evaluated using brainstem auditory evoked potentials. The reliability using the prediction error variance of breeding values and the realized reliability of the prediction of the phenotype of future progeny born in each one year between 2006 and 2009 were used as parameters to evaluate the goodness of prediction through breeding values. All animals from the previous birth years were used for prediction of the breeding values of the progeny in each of the up-coming birth years. The breeding values based on pedigree records achieved an average reliability of 0.19 for the future 1951 progeny. The predictive accuracy (R2) for the hearing status of single future progeny was at 1.3%. Combining breeding values for littermates increased the predictive accuracy to 3.5%. Corresponding values for maternal and paternal half-sib groups were at 3.2 and 7.3%. The use of breeding values for planned matings increases the phenotypic selection response over mass selection. The breeding values of sires may be used for planned matings because reliabilities and predictive accuracies for future paternal progeny groups were highest.
The Hubble Space Telescope servicing missions: Past, present, and future operational challenges
NASA Technical Reports Server (NTRS)
Ochs, William R.; Barbehenn, George M.; Crabb, William G.
1996-01-01
The Hubble Space Telescope was designed to be serviced by the Space Shuttle to upgrade systems, replace failed components and boost the telescope into higher orbits. There exists many operational challenges that must be addressed in preparation for the execution of a servicing mission, including technical and managerial issues. The operational challenges faced by the Hubble operations and ground system project for the support of the first servicing mission and future servicing missions, are considered. The emphasis is on those areas that helped ensure the success of the mission, including training, testing and contingency planning.
Pandemic influenza planning, United States, 1978-2008.
Iskander, John; Strikas, Raymond A; Gensheimer, Kathleen F; Cox, Nancy J; Redd, Stephen C
2013-06-01
During the past century, 4 influenza pandemics occurred. After the emergence of a novel influenza virus of swine origin in 1976, national, state, and local US public health authorities began planning efforts to respond to future pandemics. Several events have since stimulated progress in public health emergency planning: the 1997 avian influenza A(H5N1) outbreak in Hong Kong, China; the 2001 anthrax attacks in the United States; the 2003 outbreak of severe acute respiratory syndrome; and the 2003 reemergence of influenza A(H5N1) virus infection in humans. We outline the evolution of US pandemic planning since the late 1970s, summarize planning accomplishments, and explain their ongoing importance. The public health community's response to the 2009 influenza A(H1N1)pdm09 pandemic demonstrated the value of planning and provided insights into improving future plans and response efforts. Preparedness planning will enhance the collective, multilevel response to future public health crises.
2017-11-01
magnitude, intensity, and seasonality of climate. For infrastructure projects, relevant design life often exceeds 30 years—a period of time of...uncertainty about future statistical properties of climate at time and spatial scales required for planning and design purposes. Information...about future statistical properties of climate at time and spatial scales required for planning and design , and for assessing future operational
The Revised WIPP Passive Institutional Controls Program - A Conceptual Plan - 13145
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patterson, Russ; Klein, Thomas; Van Luik, Abraham
2013-07-01
The Department of Energy/Carlsbad Field Office (DOE/CBFO) is responsible for managing all activities related to the disposal of TRU and TRU-mixed waste in the geologic repository, 650 m below the land surface, at WIPP, near Carlsbad, New Mexico. The main function of the Passive Institutional Controls (PIC's) program is to inform future generations of the long-lived radioactive wastes buried beneath their feet in the desert. For the first 100 years after cessation of disposal operations, the rooms are closed and the shafts leading underground sealed, WIPP is mandated by law to institute Active Institutional Controls (AIC's) with fences, gates, andmore » armed guards on patrol. At this same time a plan must be in place of how to warn/inform the future, after the AIC's are gone, of the consequences of intrusion into the geologic repository disposal area. A plan was put into place during the 1990's with records management and storage, awareness triggers, permanent marker design concepts and testing schedules. This work included the thoughts of expert panels and individuals. The plan held up under peer review and met the requirements of the U.S. Environmental Protection Agency (EPA). Today the NEA is coordinating a study called the 'Preservation of Records, Knowledge and Memory (RK and M) Across Generations' to provide the international nuclear waste repository community with a guide on how a nuclear record archive programs should be approached and developed. CBFO is cooperating and participating in this project and will take what knowledge is gained and apply that to the WIPP program. At the same time CBFO is well aware that the EPA and others are expecting DOE to move forward with planning for the future WIPP PIC's program; so a plan will be in place in time for WIPP's closure slated for the early 2030's. The DOE/CBFO WIPP PIC's program in place today meets the regulatory criteria, but complete feasibility of implementation is questionable, and may not be in conformance with the international guidance being developed. International guidance currently under development may suggest that the inter-generational equity principle strives to warn the future, however, in doing so not to unduly burden present generations. Building markers and monuments that are out of proportion to the risk being presented to the future is not in keeping with generational equity. With this in mind the DOE/CBFO is developing conceptual plans for re-evaluating and revising the current WIPP PIC's program. These conceptual plans will suggest scientific and technical work that must be completed to develop a 'new' PICs program that takes the best ideas of the present plan, blended with new ideas from the RK and M project, and proposed alternative permanent markers designs and materials in consideration. (authors)« less
Pringle, Janice L; Kearney, Shannon M; Grasso, Kim; Boyer, Annette D; Conklin, Mark H; Szymanski, Keith A
2015-01-01
To user-test and evaluate a performance information management platform that makes standardized, benchmarked medication use quality data available to both health plans and community pharmacy organizations. Multiple health/drug plans and multiple chain and independent pharmacies across the United States. During the first phase of the study, user experience was measured via user satisfaction surveys and interviews with key personnel (pharmacists, pharmacy leaders, and health plan leadership). Improvements were subsequently made to the platform based on these findings. During the second phase of the study, the platform was implemented in a greater number of pharmacies and by a greater number of payers. User experience was then reevaluated to gather information for further improvements. The surveys and interviews revealed that users found the Web-based platform easy to use and beneficial in terms of understanding and comparing performance metrics. Primary concerns included lack of access to real-time data and patient-specific data. Many users also expressed uncertainty as to how they could use the information and data provided by the platform. The study findings indicate that while information management platforms can be used effectively in both pharmacy and health plan settings, future development is needed to ensure that the provided data can be transferred to pharmacy best practices and improved quality care.
Adaptation of a modern medium helicopter (Sikorsky S-76) to higher harmonic control
NASA Technical Reports Server (NTRS)
Oleary, J. J.; Kottapalli, S. B. R.; Davis, M. W.
1985-01-01
Sikorsky Aircraft has performed analytical studies, design analyses, and risk reduction tests have been performed for Higher Harmonic Control (HHC) on the S-76. The S-76 is an 8 to 10,000 lb helicopter which cruises at 145 kts. Flight test hardware has been assembled, main servo frequency response tested and upgraded, aircraft control system shake tested and verified, open loop controllers designed and fabricated, closed loop controllers defined and evaluated, and rotors turning ground and flight tests planned for the near future. Open loop analysis shows that about 2 deg of higher harmonic feathering at the blade 75% radius will be required to eliminate 4P vibration in the cockpit.
Reducing the Risk of Human Space Missions with INTEGRITY
NASA Technical Reports Server (NTRS)
Jones, Harry W.; Dillon-Merill, Robin L.; Tri, Terry O.; Henninger, Donald L.
2003-01-01
The INTEGRITY Program will design and operate a test bed facility to help prepare for future beyond-LEO missions. The purpose of INTEGRITY is to enable future missions by developing, testing, and demonstrating advanced human space systems. INTEGRITY will also implement and validate advanced management techniques including risk analysis and mitigation. One important way INTEGRITY will help enable future missions is by reducing their risk. A risk analysis of human space missions is important in defining the steps that INTEGRITY should take to mitigate risk. This paper describes how a Probabilistic Risk Assessment (PRA) of human space missions will help support the planning and development of INTEGRITY to maximize its benefits to future missions. PRA is a systematic methodology to decompose the system into subsystems and components, to quantify the failure risk as a function of the design elements and their corresponding probability of failure. PRA provides a quantitative estimate of the probability of failure of the system, including an assessment and display of the degree of uncertainty surrounding the probability. PRA provides a basis for understanding the impacts of decisions that affect safety, reliability, performance, and cost. Risks with both high probability and high impact are identified as top priority. The PRA of human missions beyond Earth orbit will help indicate how the risk of future human space missions can be reduced by integrating and testing systems in INTEGRITY.
Safety and Environment- Masterplan 2020 of DLR's Rocket Test Center Lampoldhausen
NASA Astrophysics Data System (ADS)
Haberzettl, Andreas; Dommers, Michael
2013-09-01
The German Aerospace Center DLR is the German research institute with approximately 7000 employees in 16 domestic locations. Among the research priorities of the German Aerospace Center DLR includes aerospace, energy and transport. DLR is institutionally supported by federal and state governments.Next funding sources arise in the context of third-party funds business (contract research and public contracts and subsidiaries). Main activities of the test center Lampoldshausen are testing of ARIANE's main and upper stage engines in the frame of ESA contracts.In the last years the test center of the DLR in Lampoldshausen has grown strongly, so that the number of employees is actually of about 230. The testing department is mainly responsible for rocket combustion testing according to customer requirements.Two kinds of test facilities are operated, sea level test benches and the altitude simulation test facilities.In addition to the DLR's growth also the activities of the industrial partner ASTRIUM has been elevated so that actually nearly 600 employees are present on site Lampoldshausen.The management of the site in relation to safety and security requires special measures with special respect to the presence of more people inside the testing area in order to guarantee trouble-free and safe experimental operation onsite the DLR's test plants. In order to meet with the future needs of continuing growth, the security and safety requirements have to be adopted.This report gives comprehensive outlook information about future possible scenarios of our coming tasks.Main driving force for future requests is the evolution of the rocket ARIANE. The testing of the new upper stage test facility for ARIANE 5 midlife evolution has been started. A new test position P5.2 is foreseen to perform the qualification of the new upper stage with the VINCI engine. This project will be very complex, in parallel running operation processes will require special procedures related to the overall safety of the test center.The site of Lampoldshausen with its test and supply facilities is subject to the restrictions of the German law BundesImissionsSchutzGesetz (derived from the European SEVESO-II directive) and its relevant ordinances, especially the Hazardous Incident Ordinance. Because of the complex framework effort which guarantees safety and security, Lampoldshausen has invested in people and processes in order to respect the restrictions of all relevant laws and ordinances as well as to guarantee the protection of people and the environment.Therefor a very special Master plan has been developed, with the goal to rearrange the complete testing area in order to be able to divide the area in certain sectors (testing range, technology and bureau) so that future testing enterprises will not affect almost free testing activities inside the site as it is in the present status.The paper provides comprehensive information related to the planned innovations including detailed background facts related to the foreseen safety and security standard applications.
NASA Technical Reports Server (NTRS)
Springer, Darlene
1989-01-01
Different aspects of Space Station Environmental Control and Life Support System (ECLSS) testing are currently taking place at Marshall Space Flight Center (MSFC). Unique to this testing is the variety of test areas and the fact that all are located in one building. The north high bay of building 4755, the Core Module Integration Facility (CMIF), contains the following test areas: the Subsystem Test Area, the Comparative Test Area, the Process Material Management System (PMMS), the Core Module Simulator (CMS), the End-use Equipment Facility (EEF), and the Pre-development Operational System Test (POST) Area. This paper addresses the facility that supports these test areas and briefly describes the testing in each area. Future plans for the building and Space Station module configurations will also be discussed.
Recycle of Zirconium from Used Nuclear Fuel Cladding: A Major Element of Waste Reduction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, Emory D; DelCul, Guillermo D; Terekhov, Dmitri
2011-01-01
Feasibility tests were initiated to determine if the zirconium in commercial used nuclear fuel (UNF) cladding can be recovered in sufficient purity to permit re-use, and if the recovery process can be operated economically. Initial tests are being performed with unirradiated, non-radioactive samples of various types of Zircaloy materials that are used in UNF cladding to develop the recovery process and determine the degree of purification that can be obtained. Early results indicate that quantitative recovery can be accomplished and product contamination with alloy constituents can be controlled sufficiently to meet purification requirements. Future tests with actual radioactive UNF claddingmore » are planned. The objective of current research is to determine the feasibility of recovery and recycle of zirconium from used fuel cladding wastes. Zircaloy cladding, which contains 98+% of hafnium-free zirconium, is the second largest mass, on average {approx}25 wt %, of the components in used U.S. light-water-reactor fuel assemblies. Therefore, recovery and recycle of the zirconium would enable a large reduction in geologic waste disposal for advanced fuel cycles. Current practice is to compact or grout the cladding waste and store it for subsequent disposal in a geologic repository. This paper describes results of initial tests being performed with unirradiated, non-radioactive samples of various types of Zircaloy materials that are used in UNF cladding to develop the recovery process and determine the degree of purification that can be obtained. Future tests with actual radioactive UNF cladding are planned.« less
2002-08-28
KENNEDY SPACE CENTER, FLA. - During the master plan signing ceremony at Port Canaveral Terminal 10, Matt Taylor gives a presentation to attendees, who included Canaveral National Seashore Superintendent Robert Newkirk, Canaveral Port Authority Executive Director Malcolm "Mac" McLouth, KSC Director Roy Bridges Jr., U.S. Rep. Dave Weldon, 45th Space Wing Commander Gregory Pavlovich, U.S. Fish & Wildlife Services Refuge Manager Ron Hight, Naval Ordnance Test Unit Commanding Officer William Borger, and Florida Space Authority Executive Director Ed Gormel. Taylor is vice president and chief planning officer of ZHA, Inc., which provided consulting services for the plan. The plan represents interagency cooperation between the leadership group's agencies and the U.S. Fish and Wildlife Service, the National Park Service and U.S. Navy. Joining them in developing a vision of the Spaceport's future have been aerospace educators, researchers, and businesses, along with representatives from local, state and national government.
Development of an Experiment High Performance Nozzle Research Program
NASA Technical Reports Server (NTRS)
2004-01-01
As proposed in the above OAI/NASA Glenn Research Center (GRC) Co-Operative Agreement the objective of the work was to provide consultation and assistance to the NASA GRC GTX Rocket Based Combined Cycle (RBCC) Program Team in planning and developing requirements, scale model concepts, and plans for an experimental nozzle research program. The GTX was one of the launch vehicle concepts being studied as a possible future replacement for the aging NASA Space Shuttle, and was one RBCC element in the ongoing NASA Access to Space R&D Program (Reference 1). The ultimate program objective was the development of an appropriate experimental research program to evaluate and validate proposed nozzle concepts, and thereby result in the optimization of a high performance nozzle for the GTX launch vehicle. Included in this task were the identification of appropriate existing test facilities, development of requirements for new non-existent test rigs and fixtures, develop scale nozzle model concepts, and propose corresponding test plans. Also included were the evaluation of originally proposed and alternate nozzle designs (in-house and contractor), evaluation of Computational Fluid Dynamics (CFD) study results, and make recommendations for geometric changes to result in improved nozzle thrust coefficient performance (Cfg).
Educational Planning Past, Present and Future.
ERIC Educational Resources Information Center
Williams, Gareth
1979-01-01
Two contrasting models of educational planning are described: the "technocratic," which dominated educational planning in the past; and the currently utilized "political," in which decisions emerge as the result of interplay between powerful pressure groups. The future is seen as likely to hold still greater conflict in…
Baseline Testing of the EV Global E-Bike with Ultracapacitors
NASA Technical Reports Server (NTRS)
Eichenberg, Dennis J.; Kolacz, John S.; Tavernelli, Paul F.
2001-01-01
The NASA John H. Glenn Research Center initiated baseline testing of the EV Global E-Bike SX with ultracapacitors as a way to reduce pollution in urban areas, reduce fossil fuel consumption, and reduce operating costs for transportation systems. The E-Bike provides an inexpensive approach to advance the state of art in hybrid technology in a practical application. The project transfers space technology to terrestrial use via nontraditional partners, and provides power system data valuable for future space applications. The work was done under the Hybrid Power Management (HPM) Program, which includes the Hybrid Electric Transit Bus (HETB). The E-Bike is a state of the art, ground up, hybrid electrical bicycle. Unique features of the vehicle's power system include the use of an efficient, 400 W electric hub motor, and a seven-speed derailleur system that permits operation as fully electric, fully pedal, or a combination of the two. Other innovative features, such as regenerative braking through ultracapacitor energy storage, are planned. Regenerative braking recovers much of the kinetic energy of the vehicle during deceleration. A description of the E-bike, the results of performance testing, and future vehicle development plans are given in this report. The report concludes that the E-Bike provides excellent performance, and that the implementation of ultracapacitors in the power system can provide significant performance improvements.
Building Futurism into the Institution's Strategic Planning and Human Resource Development Model.
ERIC Educational Resources Information Center
Groff, Warren H.
A process for building futurism into the institution's strategic planning and human resource development model is described. It is an attempt to assist faculty and staff to understand the future and the formulation and revision of professional goals in relation to an image of the future. A conceptual framework about the changing nature of human…
Space Transportation System Payloads Data and Analysis
NASA Technical Reports Server (NTRS)
Peterson, J. D.; Craft, H. G., Jr.
1975-01-01
The background, current developments and future plans for the Space Transportation System Payloads Data and Analysis (SPDA) activities at Marshall Space Flight Center are reviewed. It is shown how the payload data bank and future planned activities will interface with the payloads community and Space Transportation System designers. The interfaces with the STS data base include NASA planning, international planning, payload design, shuttle design, user agencies planning and information, and OMB, Congress and others.
Methodology, status and plans for development and assessment of Cathare code
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bestion, D.; Barre, F.; Faydide, B.
1997-07-01
This paper presents the methodology, status and plans for the development, assessment and uncertainty evaluation of the Cathare code. Cathare is a thermalhydraulic code developed by CEA (DRN), IPSN, EDF and FRAMATOME for PWR safety analysis. First, the status of the code development and assessment is presented. The general strategy used for the development and the assessment of the code is presented. Analytical experiments with separate effect tests, and component tests are used for the development and the validation of closure laws. Successive Revisions of constitutive laws are implemented in successive Versions of the code and assessed. System tests ormore » integral tests are used to validate the general consistency of the Revision. Each delivery of a code Version + Revision is fully assessed and documented. A methodology is being developed to determine the uncertainty on all constitutive laws of the code using calculations of many analytical tests and applying the Discrete Adjoint Sensitivity Method (DASM). At last, the plans for the future developments of the code are presented. They concern the optimization of the code performance through parallel computing - the code will be used for real time full scope plant simulators - the coupling with many other codes (neutronic codes, severe accident codes), the application of the code for containment thermalhydraulics. Also, physical improvements are required in the field of low pressure transients and in the modeling for the 3-D model.« less
Strategic Air Traffic Planning Using Eulerian Route Based Modeling and Optimization
NASA Astrophysics Data System (ADS)
Bombelli, Alessandro
Due to a soaring air travel growth in the last decades, air traffic management has become increasingly challenging. As a consequence, planning tools are being devised to help human decision-makers achieve a better management of air traffic. Planning tools are divided into two categories, strategic and tactical. Strategic planning generally addresses a larger planning domain and is performed days to hours in advance. Tactical planning is more localized and is performed hours to minutes in advance. An aggregate route model for strategic air traffic flow management is presented. It is an Eulerian model, describing the flow between cells of unidirectional point-to-point routes. Aggregate routes are created from flight trajectory data based on similarity measures. Spatial similarity is determined using the Frechet distance. The aggregate routes approximate actual well-traveled traffic patterns. By specifying the model resolution, an appropriate balance between model accuracy and model dimension can be achieved. For a particular planning horizon, during which weather is expected to restrict the flow, a procedure for designing airborne reroutes and augmenting the traffic flow model is developed. The dynamics of the traffic flow on the resulting network take the form of a discrete-time, linear time-invariant system. The traffic flow controls are ground holding, pre-departure rerouting and airborne rerouting. Strategic planning--determining how the controls should be used to modify the future traffic flow when local capacity violations are anticipated--is posed as an integer programming problem of minimizing a weighted sum of flight delays subject to control and capacity constraints. Several tests indicate the effectiveness of the modeling and strategic planning approach. In the final, most challenging, test, strategic planning is demonstrated for the six western-most Centers of the 22-Center national airspace. The planning time horizon is four hours long, and there is weather predicted that causes significant delays to the scheduled flights. Airborne reroute options are computed and added to the route model, and it is shown that the predicted delays can be significantly reduced. The test results also indicate the computational feasibility of the approach for a planning problem of this size.
Lee, Hyo
2011-08-01
There are few studies investigating psychosocial mechanisms in Korean Americans' exercise behavior. The present study tested the usefulness of the theory of planned behavior in predicting Korean American's exercise behavior and whether the descriptive norm (i.e., perceptions of what others do) improved the predictive validity of the theory of planned behavior. Using a retrospective design and self-report measures, web-survey responses from 198 Korean-American adults were analyzed using hierarchical regression analyses. The theory of planned behavior constructs accounted for 31% of exercise behavior and 43% of exercise intention. Intention and perceived behavioral control were significant predictors of exercise behavior. Although the descriptive norm did not augment the theory of planned behavior, all original constructs--attitude, injunctive norm (a narrow definition of subjective norm), and perceived behavioral control--statistically significantly predicted leisure-time physical activity intention. Future studies should consider random sampling, prospective design, and objective measures of physical activity.
Goal clarity and financial planning activities as determinants of retirement savings contributions.
Stawski, Robert S; Hershey, Douglas A; Jacobs-Lawson, Joy M
2007-01-01
Retirement counselors, financial service professionals, and retirement intervention specialists routinely emphasize the importance of developing clear goals for the future; however, few empirical studies have focused on the benefits of retirement goal setting. In the present study, the extent to which goal clarity and financial planning activities predict retirement savings practices was examined among 100 working adults. Path analysis techniques were used to test two competing models, both of which were designed to predict savings contributions. Findings provide support for the model in which retirement goal clarity is a significant predictor of planning practices, and planning, in turn, predicts savings tendencies. Two demographic variables-income and age-were also revealed to be important elements of the model, with income accounting for roughly half of the explained variance in savings contributions. The results of this study have implications for the development of age-based models of planning, as well as implications for retirement counselors and financial planners who advise workers on long-term saving strategies.
Blos, Mauricio F; Wee, Hui-Ming; Yang, Joshua
2010-11-01
Innovation challenges for handling supply chain risks have become one of the most important drivers in business competitiveness and differentiation. This study analyses competitiveness at the external supply chain level as a driver of risks and provides a framework for mitigating these risks. The mitigation framework, also called the supply chain continuity framework, provides insight into six stages of the business continuity planning (BCP) process life cycle (risk mitigation management, business impact analysis, supply continuity strategy development, supply continuity plan development, supply continuity plan testing and supply continuity plan maintenance), together with the operational constructs: customer service, inventory management, flexibility, time to market, ordering cycle time and quality. The purpose of the BCP process life cycle and operational constructs working together is to emphasise the way in which a supply chain can deal with disruption risks and, consequently, bring competitive advantage. Future research will consider the new risk scenarios and analyse the consequences to promote the improvement of supply chain resilience.
Executive Summary of Propulsion on the Orion Abort Flight-Test Vehicles
NASA Technical Reports Server (NTRS)
Jones, Daniel S.; Brooks, Syri J.; Barnes, Marvin W.; McCauley, Rachel J.; Wall, Terry M.; Reed, Brian D.; Duncan, C. Miguel
2012-01-01
The National Aeronautics and Space Administration Orion Flight Test Office was tasked with conducting a series of flight tests in several launch abort scenarios to certify that the Orion Launch Abort System is capable of delivering astronauts aboard the Orion Crew Module to a safe environment, away from a failed booster. The first of this series was the Orion Pad Abort 1 Flight-Test Vehicle, which was successfully flown on May 6, 2010 at the White Sands Missile Range in New Mexico. This report provides a brief overview of the three propulsive subsystems used on the Pad Abort 1 Flight-Test Vehicle. An overview of the propulsive systems originally planned for future flight-test vehicles is also provided, which also includes the cold gas Reaction Control System within the Crew Module, and the Peacekeeper first stage rocket motor encased within the Abort Test Booster aeroshell. Although the Constellation program has been cancelled and the operational role of the Orion spacecraft has significantly evolved, lessons learned from Pad Abort 1 and the other flight-test vehicles could certainly contribute to the vehicle architecture of many future human-rated space launch vehicles
Nurse manager succession planning: a concept analysis.
Titzer, Jennifer L; Shirey, Maria R
2013-01-01
The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.
Energy future Santa Cruz. A citizens plan for energy self-reliance: Executive summary
NASA Astrophysics Data System (ADS)
Cohn, J.; Stayton, R.
A grassroots energy conservation project which involved more than 3100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy eduction and financing, and solar, wind, and ocean energy. If the plan is successfully implemented, the energy that the community is projected to use in 1991 can be lowered by 24 to 35 percent.
Securing your financial future.
Kachalia, Parag R
2009-04-01
Securing one's financial future requires dedication and planning. A clear plan must be implemented and continually re-examined to assure an individual remains on track to achieve this security. True success of the plan will be dependent upon taking the appropriate steps to protecting one's assets against unfortunate events along with building assets with a clear end goal in mind. This article will cover the fundamental steps an individual can take to secure their financial future.
Current Status of NASA's NEXT-C Ion Propulsion System Development Project
NASA Technical Reports Server (NTRS)
Shastry, Rohit; Soulas, George; Aulisio, Michael; Schmidt, George
2017-01-01
NASA's Evolutionary Xenon Thruster (NEXT) is a 7-kW class gridded ion thruster-based propulsion system that was initially developed from 2002 to 2012 under NASAs In-Space Propulsion Technology Program to meet future science mission requirements. In 2015, a contract was awarded to Aerojet Rocketdyne, with subcontractor ZIN Technologies, to design, build and test two NEXT flight thrusters and two power processing units that would be available for use on future NASA science missions. Because an additional goal of this contract is to take steps towards offering NEXT as a commercialized system, it is called the NEXT-Commercial project, or NEXT-C. This paper reviews the capabilities of the NEXT-C system, status of the NEXT-C project, and the forward plan to build, test, and deliver flight hardware in support of future NASA and commercial applications. It also briefly addresses some of the potential applications that could utilize the hardware developed and built by the project.
NASA Technical Reports Server (NTRS)
Patterson, Michael J.; Pencil, Eric J.
2014-01-01
NASAs Evolutionary Xenon Thruster (NEXT) project is developing next generation ion propulsion technologies to enhance the performance and lower the costs of future NASA space science missions. This is being accomplished by producing Engineering Model (EM) and Prototype Model (PM) components, validating these via qualification-level and integrated system testing, and preparing the transition of NEXT technologies to flight system development. This presentation is a follow-up to the NEXT project overviews presented in 2009-2010. It reviews the status of the NEXT project, presents the current system performance characteristics, and describes planned activities in continuing the transition of NEXT technology to a first flight. In 2013 a voluntary decision was made to terminate the long duration test of the NEXT thruster, given the thruster design has exceeded all expectations by accumulating over 50,000 hours of operation to demonstrate around 900 kg of xenon throughput. Besides its promise for upcoming NASA science missions, NEXT has excellent potential for future commercial and international spacecraft applications.
Reliability Demonstration Approach for Advanced Stirling Radioisotope Generator
NASA Technical Reports Server (NTRS)
Ha, CHuong; Zampino, Edward; Penswick, Barry; Spronz, Michael
2010-01-01
Developed for future space missions as a high-efficiency power system, the Advanced Stirling Radioisotope Generator (ASRG) has a design life requirement of 14 yr in space following a potential storage of 3 yr after fueling. In general, the demonstration of long-life dynamic systems remains difficult in part due to the perception that the wearout of moving parts cannot be minimized, and associated failures are unpredictable. This paper shows a combination of systematic analytical methods, extensive experience gained from technology development, and well-planned tests can be used to ensure a high level reliability of ASRG. With this approach, all potential risks from each life phase of the system are evaluated and the mitigation adequately addressed. This paper also provides a summary of important test results obtained to date for ASRG and the planned effort for system-level extended operation.
Movement planning reflects skill level and age changes in toddlers
Chen, Yu-ping; Keen, Rachel; Rosander, Kerstin; von Hofsten, Claes
2010-01-01
Kinematic measures of children’s reaching were found to reflect stable differences in skill level for planning for future actions. Thirty-five toddlers (18–21 months) were engaged in building block towers (precise task) and in placing blocks into an open container (imprecise task). Sixteen children were re-tested on the same tasks a year later. Longer deceleration as the hand approached the block for pickup was found in the tower task compared to the imprecise task, indicating planning for the second movement. More skillful toddlers who could build high towers had a longer deceleration phase when placing blocks on the tower than toddlers who built low towers. Kinematic differences between the groups remained a year later when all children could build high towers. PMID:21077868
Lau, Wendy S Y; Zhou, Xiao-Chun; Lai, Simon M K
2017-03-01
Our behaviors are regulated by our perception of the future based on past experiences and knowledge. Children from a disadvantaged background might encounter obstacles more frequently when they plan their future. It is possible that a good relationship with an adult volunteer who provides assistance and guidance in the disadvantaged youth's development may facilitate their future-planning style and career goal setting. The present study investigated the role of a good mentoring relationship in promoting a disadvantaged youth's future-planning style and goal-setting ability. It focused on children from a disadvantaged background who participated in the Child Development Fund (CDF) in Hong Kong. In the study, 187 CDF participants (93 with high mentoring-relationship quality [MRQ] and 94 with low MRQ) and 208 comparison group participants were able to complete all four times of the survey. Repeated-measures analyses of covariance showed that Group main effects were observed for both future-planning style, F(2, 374) = 5.92, p < .01, and career goal-setting self-efficacy, F(2, 376) = 6.07, p < .01. Main Time effect was also found for the latter, F(3, 1128) = 7.99, p < .01. A significant Group × Time interaction effect was observed for future-planning style only, F(5.78, 1081.21) = 2.17, p < .05. Our results suggest that participants with high MRQ outperformed the comparison group in both future-planning style and career goal-setting self-efficacy. Multiple regression analyses revealed that mean MRQ score accounted for 3.9% (p < .01) of the variance in future-planning style and 4.1% (p < .01) of the variance in career goal-setting self-efficacy, supporting the role of a good mentoring relationship. Mentors have introduced new resources to the disadvantaged youths with high MRQ and have promoted the development of various skills through modeling. © 2017 The Institute of Psychology, Chinese Academy of Sciences and John Wiley & Sons Australia, Ltd.
Future of the Middle Rio Grande
Barbara A. Coe
1999-01-01
Because decisions made today about the Middle Rio Grande will influence future conditions, symposium participants - the stakeholders - collaborated in a final session to plan improvements for the watershed and river corridor. The result included several action plans focusing on desired future conditions and actions to achieve them.
Energy future Santa Cruz: A citizens' plan for energy self-reliance
NASA Astrophysics Data System (ADS)
Cohn, J.; Stayton, R.
The results of a grassroots energy conservation project which involved more than 3,100 residents of Santa Cruz, California, is discussed. Citizens attended forums and town meetings to suggest ideas for solving the community's energy problems. These ideas were then evaluated by the Energy Future Advisory Board and compiled into the Energy Future Plan. The energy plan covers such topics as new residences, residential retrofit, automobile efficiency, farm efficiency, commercial greenhouses, local food production, commercial efficiency, land use planning, energy education and financing, and solar, wind, and ocean energy. An energy implementation guide and glossary are included.
Future Orbital Power Systems Technology Requirements
NASA Technical Reports Server (NTRS)
1978-01-01
NASA is actively involved in program planning for missions requiring several orders of magnitude, more energy than in the past. Therefore, a two-day symposium was held to review the technology requirements for future orbital power systems. The purpose of the meeting was to give leaders from government and industry a broad view of current government supported technology efforts and future program plans in space power. It provided a forum for discussion, through workshops, to comment on current and planned programs and to identify opportunities for technology investment. Several papers are presented to review the technology status and the planned programs.
Screening for coronary heart disease risk factors in retail pharmacies in Sheffield, 1992.
Allison, C; Page, H; George, S
1994-01-01
OBJECTIVE--To investigate the current and likely future provision of screening services for risk factors for coronary heart disease in retail pharmacies in Sheffield. DESIGN--This was a questionnaire survey asking about screening tests currently offered, price charged per test, likely future provision of screening tests, the action respondents would take upon finding an abnormal test result, whether the pharmacy was owner-run, franchised, or part of a commercial chain, and inviting open comments from respondents. SETTING--All retail pharmacy premises on the Sheffield Family Health Services Authority list. RESULTS--Seventy seven responses were obtained to 102 questionnaires distributed. Only nine of these currently offered any screening test other than pregnancy testing, although 37 indicated that they might offer tests in the future. Thirty nine were not offering screening and had no plans to do so. Pharmacies offering or likely to offer screening tests were mainly owner-run. All pharmacists who replied to the question asking about their action upon finding abnormal result (33) reported that they would advise the patient to see a doctor. The most frequent comments made by pharmacists were about the commercial viability of screening in pharmacies and the lack of space available to ensure patient privacy and confidentiality during screening. CONCLUSIONS--Screening in retail pharmacies would probably be a commercial failure unless doctors were able to contract for screening services from pharmacies. Evidence from this study and others, however, leads us to question the desirability of this option. PMID:8189175
Role of future scenarios in understanding deep uncertainty in long-term air quality management.
Gamas, Julia; Dodder, Rebecca; Loughlin, Dan; Gage, Cynthia
2015-11-01
The environment and its interactions with human systems, whether economic, social, or political, are complex. Relevant drivers may disrupt system dynamics in unforeseen ways, making it difficult to predict future conditions. This kind of "deep uncertainty" presents a challenge to organizations faced with making decisions about the future, including those involved in air quality management. Scenario Planning is a structured process that involves the development of narratives describing alternative future states of the world, designed to differ with respect to the most critical and uncertain drivers. The resulting scenarios are then used to understand the consequences of those futures and to prepare for them with robust management strategies. We demonstrate a novel air quality management application of Scenario Planning. Through a series of workshops, important air quality drivers were identified. The most critical and uncertain drivers were found to be "technological development" and "change in societal paradigms." These drivers were used as a basis to develop four distinct scenario storylines. The energy and emissions implications of each storyline were then modeled using the MARKAL energy system model. NOx emissions were found to decrease for all scenarios, largely a response to existing air quality regulations, whereas SO2 emissions ranged from 12% greater to 7% lower than 2015 emissions levels. Future-year emissions differed considerably from one scenario to another, however, with key differentiating factors being transition to cleaner fuels and energy demand reductions. Application of scenarios in air quality management provides a structured means of sifting through and understanding the dynamics of the many complex driving forces affecting future air quality. Further, scenarios provide a means to identify opportunities and challenges for future air quality management, as well as a platform for testing the efficacy and robustness of particular management options across wide-ranging conditions.
Astronaut Pierre Thuot works with Middeck O-Gravity Dynamics Experiment
1994-03-04
STS062-52-025 (4-18 March 1994) --- Astronaut Pierre J. Thuot, mission specialist, works with the Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.
Astronaut Sam Gemar works with Middeck O-Gravity Dynamics Experiment (MODE)
1994-03-04
STS062-23-017 (4-18 March 1994) --- Astronaut Charles D. (Sam) Gemar, mission specialist, works with Middeck 0-Gravity Dynamics Experiment (MODE) aboard the earth-orbiting Space Shuttle Columbia. The reusable test facility is designed to study the nonlinear, gravity-dependent behavior of two types of space hardware -- contained fluids and (as depicted here) large space structures -- planned for future spacecraft.
ERIC Educational Resources Information Center
Nam, Yunju; Kim, Youngmi; Clancy, Margaret; Zager, Robert; Sherraden, Michael
2013-01-01
This study examines the impacts of Child Development Accounts (CDAs) on account holding, saving, and asset accumulation for children, using data from the SEED for Oklahoma Kids experiment (SEED OK). SEED OK, a policy test of universal and progressive CDAs, provides a 529 college savings plan account to every infant in the treatment group with…
ERIC Educational Resources Information Center
Kilinc, Ahmet; Ertmer, Peggy A.; Bahcivan, Eralp; Demirbag, Mehmet; Sonmez, Arzu; Ozel, Ruhan
2016-01-01
An expanded version of the Decomposed Theory of Planned Behavior (Ajzen, 1991), which incorporated the concept of Risk Perceptions (RP), was used to examine the intentions of Turkish preservice middle school teachers to use educational technologies (ET) in their future classrooms. A modified survey was developed and tested with a sample of 1,667…
NASA Technical Reports Server (NTRS)
Scheffler, R. L.
1979-01-01
To demonstrate the concept of utility scale electricity production from a high wind energy resource, a program was initiated to construct and test a 3 megawatt (3,000 kW) Schachle wind turbine generator near Palm Springs, California. The background and current status of this program are presented along with a summary of future planned program activities.
Planning and Decision Making for Care Transitions
Sörensen, Silvia; Mak, Wingyun; Pinquart, Martin
2015-01-01
The need to plan for future health care and residential adjustments increases with age, growing frailty, and restrictions in coverage of long-term care and will continue to grow with population aging. Older adults’ lack of financial preparation for health care costs, insufficient knowledge about available options, and inadequate communication about care-related values has become an increasing public health challenge. This chapter describes a model of Preparation for Future Care (PFC), which encompasses different levels and domains of planning. Research about the extent to which planning is helpful in navigating care transitions is reviewed, and barriers and facilitators of planning including individual, familial, cultural, and national long-term care policy factors are discussed. Planning in the context of dementia and practical approaches that can be taken to enhance PFC is addressed, as well as recommendations for future research in the area of planning and decision making in the context of care transitions. PMID:26207079
NASA Technical Reports Server (NTRS)
Berg, Jared J.
2014-01-01
Even though the Small PayLoad Integrated Testing Services or SPLITS line of business is newly established, KSC has been involved in a variety of CubeSat projects and programs. CubeSat development projects have been initiated through educational outreach partnerships with schools and universities, commercial partnerships and internal training initiatives. KSC has also been involved in CubeSat deployment through programs to find launch opportunities to fly CubeSats as auxiliary payloads on previously planned missions and involvement in the development of new launch capabilities for small satellites. This overview will highlight the CubeSat accomplishments at KSC and discuss planning for future projects and opportunities.
Pegasus hypersonic flight research
NASA Technical Reports Server (NTRS)
Curry, Robert E.; Meyer, Robert R., Jr.; Budd, Gerald D.
1992-01-01
Hypersonic aeronautics research using the Pegasus air-launched space booster is described. Two areas are discussed in the paper: previously obtained results from Pegasus flights 1 and 2, and plans for future programs. Proposed future research includes boundary-layer transition studies on the airplane-like first stage and also use of the complete Pegasus launch system to boost a research vehicle to hypersonic speeds. Pegasus flight 1 and 2 measurements were used to evaluate the results of several analytical aerodynamic design tools applied during the development of the vehicle as well as to develop hypersonic flight-test techniques. These data indicated that the aerodynamic design approach for Pegasus was adequate and showed that acceptable margins were available. Additionally, the correlations provide insight into the capabilities of these analytical tools for more complex vehicles in which design margins may be more stringent. Near-term plans to conduct hypersonic boundary-layer transition studies are discussed. These plans involve the use of a smooth metallic glove at about the mid-span of the wing. Longer-term opportunities are proposed which identify advantages of the Pegasus launch system to boost large-scale research vehicles to the real-gas hypersonic flight regime.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le Blanc, Katya Lee; Bower, Gordon Ross; Hill, Rachael Ann
In order to provide a basis for industry adoption of advanced technologies, the Control Room Upgrades Benefits Research Project will investigate the benefits of including advanced technologies as part of control room modernization This report describes the background, methodology, and research plan for the first in a series of full-scale studies to test the effects of advanced technology in NPP control rooms. This study will test the effect of Advanced Overview Displays in the partner Utility’s control room simulator
Description and operational status of the National Transonic Facility computer complex
NASA Technical Reports Server (NTRS)
Boyles, G. B., Jr.
1986-01-01
This paper describes the National Transonic Facility (NTF) computer complex and its support of tunnel operations. The capabilities of the research data acquisition and reduction are discussed along with the types of data that can be acquired and presented. Pretest, test, and posttest capabilities are also outlined along with a discussion of the computer complex to monitor the tunnel control processes and provide the tunnel operators with information needed to control the tunnel. Planned enhancements to the computer complex for support of future testing are presented.
Initial test results from a prototype, 20 kW helium charged Stirling engine
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clarke, M.A.; Taylor, D.R.
An alpha-configuration, helium charged Stirling engine with a predicted output of 20 kW indicated power has been developed by a British consortium of universities and industrial companies. The work performed by the Royal Naval Engineering College has been in computer assisted design and component testing, with future plans for full engine trials during 1984/85. The scope of this paper is to outline the data obtained during motoring trials of the engine block and crankcase assembly, together with details of modifications incorporated in the various components.
Design and verification of a turbofan swirl augmentor
NASA Technical Reports Server (NTRS)
Egan, W. J., Jr.; Shadowen, J. H.
1978-01-01
The paper discusses the details of the design and verification testing of a full-scale turbofan 'swirl' augmentor at sea level and altitude. No flameholders are required in the swirl augmentor since the radial motion of the hot pilot gases and subsequent combustion products provides a continuous ignition front across the stream. Results of rig testing of this full-scale swirl augmentor on an F100 engine, which are very encouraging, and future development plans are presented. The results validate the application of the centrifugal-force swirling flow concept to a turbofan augmentor.
Advanced wiring technique and hardware application: Airplane and space vehicle
NASA Technical Reports Server (NTRS)
Ernst, H. L.; Eichman, C. D.
1972-01-01
An advanced wiring system is described which achieves the safety/reliability required for present and future airplane and space vehicle applications. Also, present wiring installation techniques and hardware are analyzed to establish existing problem areas. An advanced wiring system employing matrix interconnecting unit, plug to plug trunk bundles (FCC or ribbon cable) is outlined, and an installation study presented. A planned program to develop, lab test and flight test key features of these techniques and hardware as a part of the SST technology follow-on activities is discussed.
ERIC Educational Resources Information Center
Florida Board of Governors, State University System, 2007
2007-01-01
Bright Futures is a Florida-state-funded scholarship program that pays either 75% or 100%, depending on the scholarship level, for up to 132 credits hours in a 120-credit-hour program. Prepaid plans are purchased for a student prior to their attending college, and usually when the future college student is a young child. The plans guarantee the…
SINGLE HEATER TEST FINAL REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.B. Cho
The Single Heater Test is the first of the in-situ thermal tests conducted by the U.S. Department of Energy as part of its program of characterizing Yucca Mountain in Nevada as the potential site for a proposed deep geologic repository for the disposal of spent nuclear fuel and high-level nuclear waste. The Site Characterization Plan (DOE 1988) contained an extensive plan of in-situ thermal tests aimed at understanding specific aspects of the response of the local rock-mass around the potential repository to the heat from the radioactive decay of the emplaced waste. With the refocusing of the Site Characterization Planmore » by the ''Civilian Radioactive Waste Management Program Plan'' (DOE 1994), a consolidated thermal testing program emerged by 1995 as documented in the reports ''In-Situ Thermal Testing Program Strategy'' (DOE 1995) and ''Updated In-Situ Thermal Testing Program Strategy'' (CRWMS M&O 1997a). The concept of the Single Heater Test took shape in the summer of 1995 and detailed planning and design of the test started with the beginning fiscal year 1996. The overall objective of the Single Heater Test was to gain an understanding of the coupled thermal, mechanical, hydrological, and chemical processes that are anticipated to occur in the local rock-mass in the potential repository as a result of heat from radioactive decay of the emplaced waste. This included making a priori predictions of the test results using existing models and subsequently refining or modifying the models, on the basis of comparative and interpretive analyses of the measurements and predictions. A second, no less important, objective was to try out, in a full-scale field setting, the various instruments and equipment to be employed in the future on a much larger, more complex, thermal test of longer duration, such as the Drift Scale Test. This ''shake down'' or trial aspect of the Single Heater Test applied not just to the hardware, but also to the teamwork and cooperation between multiple organizations performing their part in the test.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Romanov, A.
Many modern and most future accelerators rely on precise configuration of lattice and trajectory. The Integrable Optics Test Accelerator (IOTA) at Fermilab that is coming to final stages of construction will be used to test advanced approaches of control over particles dynamics. Various experiments planned at IOTA require high flexibility of lattice configuration as well as high precision of lattice and closed orbit control. Dense element placement does not allow to have ideal configuration of diagnostics and correctors for all planned experiments. To overcome this limitations advanced method of lattice an beneficial for other machines. Developed algorithm is based onmore » LOCO approach, extended with various sets of other experimental data, such as dispersion, BPM BPM phase advances, beam shape information from synchrotron light monitors, responses of closed orbit bumps to variations of focusing elements and other. Extensive modeling of corrections for a big number of random seed errors is used to illustrate benefits from developed approach.« less
... Resources Treatment Options Family Issues Autism Friendly Community Inclusion Future Planning How the Autism Society can Help ... Resources Treatment Options Family Issues Autism Friendly Community Inclusion Future Planning How the Autism Society can Help ...
Pandemic Influenza Planning, United States, 1978–2008
Strikas, Raymond A.; Gensheimer, Kathleen F.; Cox, Nancy J.; Redd, Stephen C.
2013-01-01
During the past century, 4 influenza pandemics occurred. After the emergence of a novel influenza virus of swine origin in 1976, national, state, and local US public health authorities began planning efforts to respond to future pandemics. Several events have since stimulated progress in public health emergency planning: the 1997 avian influenza A(H5N1) outbreak in Hong Kong, China; the 2001 anthrax attacks in the United States; the 2003 outbreak of severe acute respiratory syndrome; and the 2003 reemergence of influenza A(H5N1) virus infection in humans. We outline the evolution of US pandemic planning since the late 1970s, summarize planning accomplishments, and explain their ongoing importance. The public health community’s response to the 2009 influenza A(H1N1)pdm09 pandemic demonstrated the value of planning and provided insights into improving future plans and response efforts. Preparedness planning will enhance the collective, multilevel response to future public health crises. PMID:23731839
Thomeer, Mieke Beth; Donnelly, Rachel; Reczek, Corinne; Umberson, Debra
2017-12-01
Two key components of end-of-life planning are (1) informal discussions about future care and other end-of-life preferences and (2) formal planning via living wills and other legal documents. We leverage previous work on the institutional aspects of marriage and on sexual-minority discrimination to theorize why and how heterosexual, gay, and lesbian married couples engage in informal and formal end-of-life planning. We analyze qualitative dyadic in-depth interviews with 45 midlife gay, lesbian, and heterosexual married couples ( N = 90 spouses). Findings suggest that same-sex spouses devote considerable attention to informal planning conversations and formal end-of-life plans, while heterosexual spouses report minimal formal or informal planning. The primary reasons same-sex spouses give for making end-of-life preparations are related to the absence of legal protections and concerns about discrimination from families. These findings raise questions about future end-of-life planning for same- and different-sex couples given a rapidly shifting legal and social landscape.
Demographic Analysis and Planning for the Future. No. 13.
ERIC Educational Resources Information Center
Efird, Cathy M.
The basic sources and types of demographic data available for future planning for the developmentally disabled are reviewed and a frame work for data organization is suggested. It is explained that future forecasts may be undertaken by the following principles: trend forecasting or extrapolation; scenario construction; models, games, and…
Futures Planning--Adult Sibling Perspectives
ERIC Educational Resources Information Center
Davys, Deborah; Mitchell, Duncan; Haigh, Carol
2015-01-01
A total of 15 adult siblings of people who have a learning disability were interviewed in relation to their future wishes and expectations of care giving. Interpretative Phenomenological Analysis (IPA) was used to analyse transcripts from the interviews where it was demonstrated that futures planning remains an area of difficulty for families of…
Progress of Crew Autonomous Scheduling Test (CAST) On the ISS
NASA Technical Reports Server (NTRS)
Healy, Matthew; Marquez, Jessica; Hillenius, Steven; Korth, David; Bakalyar, Lauren Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke;
2017-01-01
The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This presentation shows the progress done in this study with a single astronaut test subject participating in five CAST sessions. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers.
Demand forecasting for automotive sector in Malaysia by system dynamics approach
NASA Astrophysics Data System (ADS)
Zulkepli, Jafri; Fong, Chan Hwa; Abidin, Norhaslinda Zainal
2015-12-01
In general, Proton as an automotive company needs to forecast future demand of the car to assist in decision making related to capacity expansion planning. One of the forecasting approaches that based on judgemental or subjective factors is normally used to forecast the demand. As a result, demand could be overstock that eventually will increase the operation cost; or the company will face understock, which resulted losing their customers. Due to automotive industry is very challenging process because of high level of complexity and uncertainty involved in the system, an accurate tool to forecast the future of automotive demand from the modelling perspective is required. Hence, the main objective of this paper is to forecast the demand of automotive Proton car industry in Malaysia using system dynamics approach. Two types of intervention namely optimistic and pessimistic experiments scenarios have been tested to determine the capacity expansion that can prevent the company from overstocking. Finding from this study highlighted that the management needs to expand their production for optimistic scenario, whilst pessimistic give results that would otherwise. Finally, this study could help Proton Edar Sdn. Bhd (PESB) to manage the long-term capacity planning in order to meet the future demand of the Proton cars.
Preserving the world second largest hypersaline lake under future irrigation and climate change.
Shadkam, Somayeh; Ludwig, Fulco; van Vliet, Michelle T H; Pastor, Amandine; Kabat, Pavel
2016-07-15
Iran Urmia Lake, the world second largest hypersaline lake, has been largely desiccated over the last two decades resulting in socio-environmental consequences similar or even larger than the Aral Sea disaster. To rescue the lake a new water management plan has been proposed, a rapid 40% decline in irrigation water use replacing a former plan which intended to develop reservoirs and irrigation. However, none of these water management plans, which have large socio-economic impacts, have been assessed under future changes in climate and water availability. By adapting a method of environmental flow requirements (EFRs) for hypersaline lakes, we estimated annually 3.7·10(9)m(3) water is needed to preserve Urmia Lake. Then, the Variable Infiltration Capacity (VIC) hydrological model was forced with bias-corrected climate model outputs for both the lowest (RCP2.6) and highest (RCP8.5) greenhouse-gas concentration scenarios to estimate future water availability and impacts of water management strategies. Results showed a 10% decline in future water availability in the basin under RCP2.6 and 27% under RCP8.5. Our results showed that if future climate change is highly limited (RCP2.6) inflow can be just enough to meet the EFRs by implementing the reduction irrigation plan. However, under more rapid climate change scenario (RCP8.5) reducing irrigation water use will not be enough to save the lake and more drastic measures are needed. Our results showed that future water management plans are not robust under climate change in this region. Therefore, an integrated approach of future land-water use planning and climate change adaptation is therefore needed to improve future water security and to reduce the desiccating of this hypersaline lake. Copyright © 2016 Elsevier B.V. All rights reserved.
Use of Cold Radiometers in Several Thermal/Vacuum Tests
NASA Technical Reports Server (NTRS)
DiPirro, M.; Tuttle, J.; Canavan, E.; Shirron, P.
2011-01-01
We have developed a low cost low temperature broadband radiometer for use with low temperature tests as a diagnostic tool for measuring stray thermal radiation and remote measurement of material properties. So far these radiometers have been used in two large thermal/vacuum tests for the James Webb Space Telescope (JWST) Project. In the first test the radiometers measured stray radiation in a test of part of the JWST sunshield, and in the second test the radiometers were used to measure the reflectivity and specularity of black Z307 painted aluminum walls on a 25 K cooled shroud. These results will be presented as well as plans for future tests to measure the residual energy through a baffled aperture in the shroud and other stray thermal energy measurements.
Cost effective development of a national test bed
NASA Technical Reports Server (NTRS)
Waites, H. B.; Jones, V. L.; Seltzer, S. M.
1988-01-01
For several years, the Marshall Space Flight Center has pursued the coordinated development of a Large Space Structures (LSS) National Test Bed for the investigation of numerous technical issues involved in the use of LSS in space. The origins of this development, the current status of the various test facilities and the plans laid down for the next five years' activities are described. Particular emphasis on the control and structural interaction issues has been paid so far; however, immediately emerging are user applications (such as the proposed pinhole occulter facility). In the immediate future, such emerging technologies as smart robots and multibody interactions will be studied. These areas are covered.
NASA Technical Reports Server (NTRS)
Knight, R. M.
1978-01-01
The objectives of the flight test and a description on how those objectives are in support of an overall program goal of attaining user application were described. The approach to accomplishment was presented as it applies to integrating the propulsion system with the host spacecraft. A number of known interface design considerations which affect the propulsion system and the spacecraft were discussed. Analogies were drawn comparing the relationship of the organizations involved with this flight test with those anticipated for future operational missions. The paper also expanded upon objectives, system description, mission operations, and measurement of plume effects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dave Madsen
This Closure Report provides the documentation for closure of the Cactus Spring Waste Trenches Corrective Action Unit (CAU) 426. The site is located on the Tonopah Test Range, approximately 225 kilometers northwest of Las Vegas, NV. CAU 426 consists of one corrective action site (CAS) which is comprised of four waste trenches. The trenches were excavated to receive solid waste generated in support of Operation Roller Coaster, primary the Double Tracks Test in 1963, and were subsequently backfilled. The Double Tracks Test involved use of live animals to assess the biological hazards associated with the nonnuclear detonation of plutonium-bearing devices.more » The Nevada Division of Environmental Protection approved Corrective Action Plan (CAP)which proposed ''capping'' methodology. The closure activities were completed in accordance with the approved CAP and consisted of constructing an engineered cover in the area of the trenches, constructing/planting a vegetative cover, installing a perimeter fence and signs, implementing restrictions on future use, and preparing a Post-Closure Monitoring Plan.« less
Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center
NASA Technical Reports Server (NTRS)
Ernst, E. W.; Sass, J. P.; Lobemeyer, D. A.; Sojourner, S. J.; Hatfield, W. H.; Rewinkel, D. A.
2007-01-01
The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility
Planning Programming Budgeting Systems: PPBS and Education.
ERIC Educational Resources Information Center
Katzenbach, Edward L.
Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…
A Blueprint for the Future: Corporate Plan, 1995-2000.
ERIC Educational Resources Information Center
Aurora Coll., Fort Smith (Northwest Territories).
Providing a blueprint for the future of Aurora College (AC), in the Northwest Territories, Canada, this plan describes general directions and strategies for the period from 1995 to 2000. Following a summary, section 1 provides background to the development of the plan, while section 2 provides information on the college, including data on students…
ERIC Educational Resources Information Center
Thomas, Susan
2016-01-01
The National Education Technology Plan is the flagship educational technology policy document for the United States. The 2016 Plan, "Future Ready Learning: Reimagining the Role of Technology in Education," articulates a vision of equity, active use, and collaborative leadership to make everywhere, all-the-time learning possible. While…
Safeguards Technology Strategic Planning Pentachart
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carroll, C. J.
Builds on earlier strategic planning workshops conducted for SGIT, SGTS, and SGCP. Many of recommendations from these workshops have been successfully implemented at the IAEA. Provide a context for evaluating new approaches for anticipated safeguards challenges of the future. Approach used by government and military to plan for an uncertain future. Uses consensus decision-making.
ELearning Strategic Planning 2020: The Voice of Future Students as Stakeholders in Higher Education
ERIC Educational Resources Information Center
Finger, Glenn; Smart, Vicky
2013-01-01
Most universities are undertaking information technology (IT) strategic planning. The development of those plans often includes the voices of academics and sometimes engages alumni and current students. However, few engage and acknowledge the voice of future students. This paper is situated within the "Griffith University 2020 Strategic…
Succession Planning and Management: The Backbone of the Radiology Group's Future.
Donner, E Michael; Gridley, Daniel; Ulreich, Sidney; Bluth, Edward I
2017-01-01
The transition of leadership within radiology practices is often not a planned replacement process with formal development of potential future leaders. To ensure their ongoing success, however, practices need to develop comprehensive succession plans that include a robust developmental program for potential leaders consisting of mentoring, coaching, structured socialization, 360-degree feedback, developmental stretch assignments, job rotation, and formal education. Succession planning and leadership development will be necessary in the future for a practice to be successful in its business relationships and to be financially viable. Copyright © 2016 American College of Radiology. Published by Elsevier Inc. All rights reserved.
NASA Technical Reports Server (NTRS)
Bekey, I.; Mayer, H. L.; Wolfe, M. G.
1976-01-01
The methodology of alternate world future scenarios is utilized for selecting a plausible, though not advocated, set of future scenarios each of which results in a program plan appropriate for the respective environment. Each such program plan gives rise to different building block and technology requirements, which are analyzed for common need between the NASA and the DoD for each of the alternate world scenarios. An essentially invariant set of system, building block, and technology development plans is presented at the conclusion, intended to allow protection of most of the options for system concepts regardless of what the actual future world environment turns out to be. Thus, building block and technology needs are derived which support: (1) each specific world scenario; (2) all the world scenarios identified in this study; or (3) generalized scenarios applicable to almost any future environment. The output included in this volume consists of the building blocks, i.e.: transportation vehicles, orbital support vehicles, and orbital support facilities; the technology required to support the program plans; identification of their features which could support the DoD and NASA in common; and a complete discussion of the planning methodology.
Healthy, wealthy, and wise: retirement planning predicts employee health improvements.
Gubler, Timothy; Pierce, Lamar
2014-09-01
Are poor physical and financial health driven by the same underlying psychological factors? We found that the decision to contribute to a 401(k) retirement plan predicted whether an individual acted to correct poor physical-health indicators revealed during an employer-sponsored health examination. Using this examination as a quasi-exogenous shock to employees' personal-health knowledge, we examined which employees were more likely to improve their health, controlling for differences in initial health, demographics, job type, and income. We found that existing retirement-contribution patterns and future health improvements were highly correlated. Employees who saved for the future by contributing to a 401(k) showed improvements in their abnormal blood-test results and health behaviors approximately 27% more often than noncontributors did. These findings are consistent with an underlying individual time-discounting trait that is both difficult to change and domain interdependent, and that predicts long-term individual behaviors in multiple dimensions. © The Author(s) 2014.
FBIS report. Science and technology: Europe/International, March 29, 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-29
;Partial Contents: Advanced Materials (EU Project to Improve Production in Metal Matrix Compounds Noted, Germany: Extremely Hard Carbon Coating Development, Italy: Director of CNR Metallic Materials Institute Interviewed); Aerospace (ESA Considers Delays, Reductions as Result of Budget Cuts, Italy: Space Agency`s Director on Restructuring, Future Plans); Automotive, Transportation (EU: Clean Diesel Engine Technology Research Reviewed); Biotechnology (Germany`s Problems, Successes in Biotechnology Discussed); Computers (EU Europort Parallel Computing Project Concluded, Italy: PQE 2000 Project on Massively Parallel Systems Viewed); Defense R&D (France: Future Tasks of `Brevel` Military Intelligence Drone Noted); Energy, Environment (German Scientist Tests Elimination of Phosphates); Advanced Manufacturing (France:more » Advanced Rapid Prototyping System Presented); Lasers, Sensors, Optics (France: Strategy of Cilas Laser Company Detailed); Microelectronics (France: Simulation Company to Develop Microelectronic Manufacturing Application); Nuclear R&D (France: Megajoule Laser Plan, Cooperation with Livermore Lab Noted); S&T Policy (EU Efforts to Aid Small Companies` Research Viewed); Telecommunications (France Telecom`s Way to Internet).« less
Memories of past episodes shape current intentions and decisions.
Kuwabara, Kie J; Pillemer, David B
2010-05-01
This research tested the hypothesis that people's decisions and future plans are influenced by recently activated autobiographical memories. University students rated the overall quality of their college experiences. They were also asked to describe a specific memory of being either satisfied or dissatisfied with the university. Control participants did not describe a memory. After statistically controlling for pre-existing attitudes towards the university, students who recounted a positive memory expressed the strongest intentions to donate money to the university, attend a class reunion, and recommend the university to others, and they were more likely than controls to specify that an actual donation be made to the university rather than to another charity. Emotional intensity of positive memories predicted future plans and donation decisions. Students who recounted a negative memory also tended to favour the university in their actual donation decisions compared to controls. Prompting the recall of emotional memories may be an effective way to influence intentions and decisions.
Coping with an unplanned pregnancy.
Smolen, B
1993-10-01
A 15-year-old high school student from Johnstown, Pennsylvania, recounted her experience with an unplanned pregnancy. The student learned of her pregnancy by seeking out the help of a neighbor, who was a nurse. Her response to the positive results of the pregnancy test was tears and the fear that her parents would strongly disapprove. Her father's response to the knowledge about the pregnancy was apprehension about whether the baby's father was a drug user. Her mother responded by asking her daughter very personal questions, which created a very uncomfortable situation. Both parents felt hurt by their daughter's behavior and considered that their plans for their daughter's future were spoiled. Evidently, the daughter decided to keep the child, and the parents approved. The family's support helped the daughter through difficult morning sickness and her initial humiliation and secured the baby's future in a loving and caring household. Classmates and teachers also supported her decision to keep her baby. The new mother resumed classes after the birth of her baby and plans to graduate.
Utilization of the International Space Station for Crew Autonomous Scheduling Test (CAST)
NASA Technical Reports Server (NTRS)
Healy, Matthew; Marquez, Jesica; Hillenius, Steven; Korth, David; Bakalyar, Laure Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke;
2017-01-01
The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This paper presents the results from a single astronaut test subject who participated in five CAST sessions. The details on the operational philosophy of CAST are discussed, including the approach to crew training, selection criteria for test days, and data collection methods. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers. It is hoped the results of this investigation will guide NASA's implementation of autonomous mission operations for long duration human space missions to Mars and beyond.
NASA Astrophysics Data System (ADS)
Watanabe, Yukinobu; Kin, Tadahiro; Araki, Shouhei; Nakayama, Shinsuke; Iwamoto, Osamu
2017-09-01
A comprehensive research program on deuteron nuclear data motivated by development of accelerator-based neutron sources is being executed. It is composed of measurements of neutron and gamma-ray yields and production cross sections, modelling of deuteron-induced reactions and code development, nuclear data evaluation and benchmark test, and its application to medical radioisotopes production. The goal of this program is to develop a state-of-the-art deuteron nuclear data library up to 200 MeV which will be useful for the design of future (d,xn) neutron sources. The current status and future plan are reviewed.
Autonomously managed electrical power systems
NASA Technical Reports Server (NTRS)
Callis, Charles P.
1986-01-01
The electric power systems for future spacecraft such as the Space Station will necessarily be more sophisticated and will exhibit more nearly autonomous operation than earlier spacecraft. These new power systems will be more reliable and flexible than their predecessors offering greater utility to the users. Automation approaches implemented on various power system breadboards are investigated. These breadboards include the Hubble Space Telescope power system test bed, the Common Module Power Management and Distribution system breadboard, the Autonomusly Managed Power System (AMPS) breadboard, and the 20 kilohertz power system breadboard. Particular attention is given to the AMPS breadboard. Future plans for these breadboards including the employment of artificial intelligence techniques are addressed.
Space transportation system biomedical operations support study
NASA Technical Reports Server (NTRS)
White, S. C.
1983-01-01
The shift of the Space Transportation System (STS) flight tests of the orbiter vehicle to the preparation and flight of the payloads is discussed. Part of this change is the transition of the medical and life sciences aspects of the STS flight operations to reflect the new state. The medical operations, the life sciences flight experiments support requirements and the intramural research program expected to be at KSC during the operational flight period of the STS and a future space station are analyzed. The adequacy of available facilities, plans, and resources against these future needs are compared; revisions and/or alternatives where appropriate are proposed.
Development of a Crosslink Channel Simulator
NASA Technical Reports Server (NTRS)
Hunt, Chris; Smith, Carl; Burns, Rich
2004-01-01
Distributed Spacecraft missions are an integral part of current and future plans for NASA and other space agencies. Many of these multi-vehicle missions involve utilizing the array of spacecraft as a single, instrument requiring communication via crosslinks to achieve mission goals. NASA s Goddard Space Flight Center (GSFC) is developing the Formation Flying Test Bed (FFTB) to provide a hardware-in-the-loop simulation environment to support mission concept development and system trades with a primary focus on Guidance, Navigation, and Control (GN&C) challenges associated with spacecraft flying. The goal of the FFTB is to reduce mission risk by assisting in mission planning and analysis, provide a technology development platform that allows algorithms to be developed for mission functions such as precision formation navigation and control and time synchronization. The FFTB will provide a medium in which the various crosslink transponders being used in multi-vehicle missions can be integrated for development and test; an integral part of the FFTB is the Crosslink Channel Simulator (CCS). The CCS is placed into the communications channel between the crosslinks under test, and is used to simulate on-mission effects to the communications channel such as vehicle maneuvers, relative vehicle motion, or antenna misalignment. The CCS is based on the Starlight software programmable platform developed at General Dynamics Decision Systems and provides the CCS with the ability to be modified on the fly to adapt to new crosslink formats or mission parameters. This paper briefly describes the Formation Flying Test Bed and its potential uses. It then provides details on the current and future development of the Crosslink Channel Simulator and its capabilities.
Progress on the Development of Future Airport Surface Wireless Communications Network
NASA Technical Reports Server (NTRS)
Kerczewski, Robert J.; Budinger, James M.; Brooks, David E.; Franklin, Morgan; DeHart, Steve; Dimond, Robert P.; Borden, Michael
2009-01-01
Continuing advances in airport surface management and improvements in airport surface safety are required to enable future growth in air traffic throughout the airspace, as airport arrival and departure delays create a major system bottleneck. These airport management and safety advances will be built upon improved communications, navigation, surveillance, and weather sensing, creating an information environment supporting system automation. The efficient movement of the digital data generated from these systems requires an underlying communications network infrastructure to connect data sources with the intended users with the required quality of service. Current airport surface communications consists primarily of buried copper or fiber cable. Safety related communications with mobile airport surface assets occurs over 25 kHz VHF voice and data channels. The available VHF spectrum, already congested in many areas, will be insufficient to support future data traffic requirements. Therefore, a broadband wireless airport surface communications network is considered a requirement for the future airport component of the air transportation system. Progress has been made on defining the technology and frequency spectrum for the airport surface wireless communications network. The development of a test and demonstration facility and the definition of required testing and standards development are now underway. This paper will review the progress and planned future work.
Planning Schools for the Future. Publication No. BM-1.
ERIC Educational Resources Information Center
Weinberger, JoAnn
In a three-year study, Research for Better Schools (RBS) was asked by the National Institute of Education to identify, analyze, and verify definitive social changes forecast for the decades ahead, and to project their implications for schools of the future. RBS reviewed the literature to extract future planning needs relevant to educational…
ED QUEST: A Model Procedure for Futures Planning in Educational Organizations.
ERIC Educational Resources Information Center
Adams, Charles F.
Most educational planning models are weak at identifying future events and assessing their impact on education. At best they assume a surprise-free future in which present trends continue unabated and interrelationships among social, economic, political, and technological forces stay the same. The ED QUEST model was developed to ameliorate these…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Le, A; Choe, K; Jiang, S
2015-06-15
Purpose: To demonstrate the feasibility of a CBCT-based on-site simulation, planning, and delivery (OSPD) for whole brain radiotherapy, in which all steps from imaging, planning to treatment delivery are performed at the treatment unit in one appointment time slot. This work serves as the proof of concept for future OSPD single fraction radiation therapy. Methods: An integrated on-site imaging, planning and delivery workflow was developed and tested for whole brain radiotherapy. An automated two-opposed-oblique-beam plan is created by utilizing the treatment planning system scripting and simple field-in-field IMRT. The IMRT plan is designed with maximum 8 control points to covermore » the target volume consisting of the brain to C1/C2 of the spinal cord, with dose homogeneity criteria from −5% to +7% of the prescription dose. Due to inaccuracy of reconstructed Hounsfield unit numbers in CBCT images, the dose distribution is calculated with non-heterogeneity correction introducing only clinically insignificant dose discrepancy. A coherent and synchronized workflow was designed for a team of attending physician, physicist, therapists, and dosimetrist to work closely with the ability to quickly modify, approve, and implement the treatment. Results: Thirty-one patients have been treated with this OSPD treatment, without compromising the plan quality compared to our regular clinically used parallel apposed 2D plans. The average time for these procedures are 48.02 ±11.55 minutes from the time patient entered the treatment room until s/he exited, and 35.09 ±10.35 minutes from starting CBCT until last beam delivered. This time duration is comparable to the net time when individual tasks are summed up during our regular CT- based whole brain planning and delivery. Conclusions: The OSPD whole brain treatment has been tested to be clinically feasible. The next step is to further improve the efficiency and to streamline the workflow. Other disease sites will be also tested with this new technology.« less
Research on test of alkali-resistant glass fibre enhanced seawater coral aggregate concrete
NASA Astrophysics Data System (ADS)
Liu, Leiyang; Wang, Xingquan
2017-12-01
It is proposed in the 13th five-year plan that reefs of the south China sea should be constructed. In the paper, an innovative thinking was proposed for the first time in order to realize local material acquisition in island construction and life dependence on sea, namely alkali-resistant glass fibre is mixed in coralaggregate concrete as reinforcing material. The glass fibre is characterized by low price, low hardness, good dispersibility and convenient construction. Reliable guarantee is provided for widely applying the material in future projects. In the paper, an orthogonal test method is firstly applied to determine the mix proportion of grade C50 coral aggregate concrete. Then, the design plan ofmix proportion of alkali-resistant glass fibre enhanced seawater coral aggregate concrete is determined. Finally, the influence law of alkali-resistant glass fibre dosageon tensile compressiveflexture strength of seawatercoralaggregate concrete is made clear.
Hypersonic Inflatable Aerodynamic Decelerator (HIAD) Technology Development Overview
NASA Technical Reports Server (NTRS)
Hughes, Stephen J.; Cheatwood, F. McNeil; Calomino, Anthony M.; Wright, Henry S.; Wusk, Mary E.; Hughes, Monica F.
2013-01-01
The successful flight of the Inflatable Reentry Vehicle Experiment (IRVE)-3 has further demonstrated the potential value of Hypersonic Inflatable Aerodynamic Decelerator (HIAD) technology. This technology development effort is funded by NASA's Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP). This paper provides an overview of a multi-year HIAD technology development effort, detailing the projects completed to date and the additional testing planned for the future.
NASA UTILIZATION OF THE INTERNATIONAL SPACE STATION AND THE VISION FOR SPACE EXPLORATION
NASA Technical Reports Server (NTRS)
Robinson, Julie A.; Thomas, Donald A.
2006-01-01
Under U.S. President Bush s Vision for Space Exploration (January 14, 2004), NASA has refocused its utilization plans for the International Space Station (ISS). This use will now focus on: (1) the development of countermeasures that will protect crews from the hazards of the space environment, (2) testing and validating technologies that will meet information and systems needs for future exploration missions.
Service Test Plan for A-10 Hydraulic Actuators
2014-05-29
utilizes electroplated chrome as a wear coating on the actuator assembly. This actuator will be delta-qualified while two other actuators will be qualified...2730534-1 Similarity to (1) 3 Elevator Actuator Hydraulic Flight Control System 2730551-5 Similarity to (1) The current chrome electroplating ...process has been proven to be a significant health hazard, and it is anticipated that future Government regulation will make the use of electroplated
The asteroid impact mission: testing laser communication in deep-space
NASA Astrophysics Data System (ADS)
Carnelli, I.; Mellab, K.; Heese, C.; Sodnik, Z.; Pesquita, V.; Gutierrez, B.
2017-09-01
In October 2022 the binary asteroid system 65803 Didymos will have an exceptionally close approach with the Earth flying by within only 0.088 AU. ESA is planning to leverage on this close encounter to launch a small mission of opportunity called Asteroid Impact Mission (AIM) to explore and demonstrate new technologies for future science and exploration missions while addressing planetary defence and performing asteroid scientific investigations.
DARe: Dark Asteroid Rendezvous
NASA Technical Reports Server (NTRS)
Noll, K. S.; McFadden, L. A.; Rhoden, A. R.; Lim, L. F.; Boynton, W. V.; Carter, L. M.; Collins, G.; Englander, J. A.; Goossens, S. A.; Grundy, W. M.;
2015-01-01
Small bodies record the chemical, physical, and dynamical processes that gave birth to and shaped the solar system. The great variety of small bodies reflects the diversity of both their genesis and their histories. The DARe mission conducts a critical test of how small body populations reflect a history of planetary migration and planetesimal scattering. This understanding is crucial for planning future NASA missions and placing current and past missions into context.
Avalanche Photoconductive Switching
1989-06-01
implantation and by MBE growth , and p-type material was created by MBE growth of a Be doped layer. Ion implantation creates a heavily doped layer...which is used commonly for GaAs integrated circuits. We plan to use Ti-Pt-Au for p-type contacts in the future. Experimental Results Test Confi...optical wavelenght does not significantly affect the switching process. Another feature of this mode of operation is that there is a threshold
Strategic plan : our guide to the future
DOT National Transportation Integrated Search
1997-01-01
The Federal Aviation Administration Logistics Center's strategic plan provides a direction for the future based on analysis of factors affecting current Logistics Center business operations. The FAA Logistics Center management team analyzed the curre...
Future Plans for NASA's Deep Space Network
NASA Technical Reports Server (NTRS)
Deutsch, Leslie J.; Preston, Robert A.; Geldzahler, Barry J.
2008-01-01
This slide presentation reviews the importance of NASA's Deep Space Network (DSN) to space exploration, and future planned improvements to the communication capabilities that the network allows, in terms of precision, and communication power.
Advanced Stirling Radioisotope Generator Life Certification Plan
NASA Technical Reports Server (NTRS)
Rusick, Jeffrey J.; Zampino, Edward J.
2013-01-01
An Advanced Stirling Radioisotope Generator (ASRG) power supply is being developed by the Department of Energy (DOE) in partnership with NASA for potential future deep space science missions. Unlike previous radioisotope power supplies for space exploration, such as the passive MMRTG used recently on the Mars Curiosity rover, the ASRG is an active dynamic power supply with moving Stirling engine mechanical components. Due to the long life requirement of 17 years and the dynamic nature of the Stirling engine, the ASRG project faced some unique challenges trying to establish full confidence that the power supply will function reliably over the mission life. These unique challenges resulted in the development of an overall life certification plan that emphasizes long-term Stirling engine test and inspection when analysis is not practical. The ASRG life certification plan developed is described.
Open-Loop Performance of COBALT Precision Landing Payload on a Commercial Sub-Orbital Rocket
NASA Technical Reports Server (NTRS)
Restrepo, Carolina I.; Carson, John M., III; Amzajerdian, Farzin; Seubert, Carl R.; Lovelace, Ronney S.; McCarthy, Megan M.; Tse, Teming; Stelling, Richard; Collins, Steven M.
2018-01-01
An open-loop flight test campaign of the NASA COBALT (CoOperative Blending of Autonomous Landing Technologies) platform was conducted onboard the Masten Xodiac suborbital rocket testbed. The COBALT platform integrates NASA Guidance, Navigation and Control (GN&C) sensing technologies for autonomous, precise soft landing, including the Navigation Doppler Lidar (NDL) velocity and range sensor and the Lander Vision System (LVS) Terrain Relative Navigation (TRN) system. A specialized navigation filter running onboard COBALT fuses the NDL and LVS data in real time to produce a navigation solution that is independent of GPS and suitable for future, autonomous, planetary, landing systems. COBALT was a passive payload during the open loop tests. COBALT's sensors were actively taking data and processing it in real time, but the Xodiac rocket flew with its own GPS-navigation system as a risk reduction activity in the maturation of the technologies towards space flight. A future closed-loop test campaign is planned where the COBALT navigation solution will be used to fly its host vehicle.
Tests of Halon 1301 test gas simulants
NASA Astrophysics Data System (ADS)
Carhart, H. W.; Leonard, J. T.; Dinenno, P. J.; Starchville, M. D.; Forssell, E. W.; Wong, J. T.
1989-02-01
All new and retrofit installations of Halon 1301 (CBrF3) total flooding fire protection systems in shipboard machinery spaces require full acceptance discharge test. It is desirable to use a suitable simulant test gas in these tests in view of current and future regulation of Halon 1301. Sulfur hexafluoride, SF6, and chlorodifluromethane R-22, were identified as candidate simulants on the basis of their similarity in physical properties to Halon 1301. These two candidates were then evaluated on the basis of leakage from an enclosure. SF6 was determined to be an excellent simulant for Halon 1301 when considering leakage from an enclosure. Further testing of SF6 and R-22 is planned for other important aspects of Halon 1301 systems, i.e., flow hydraulics, initial mixing.
Human-in-the-Loop Operations over Time Delay: NASA Analog Missions Lessons Learned
NASA Technical Reports Server (NTRS)
Rader, Steven N.; Reagan, Marcum L.; Janoiko, Barbara; Johnson, James E.
2013-01-01
Teams at NASA have conducted studies of time-delayed communications as it effects human exploration. In October 2012, the Advanced Exploration Systems (AES) Analog Missions project conducted a Technical Interchange Meeting (TIM) with the primary stakeholders to share information and experiences of studying time delay, to build a coherent picture of how studies are covering the problem domain, and to determine possible forward plans (including how to best communicate study results and lessons learned, how to inform future studies and mission plans, and how to drive potential development efforts). This initial meeting s participants included personnel from multiple NASA centers (HQ, JSC, KSC, ARC, and JPL), academia, and ESA. It included all of the known studies, analog missions, and tests of time delayed communications dating back to the Apollo missions including NASA Extreme Environment Mission Operations (NEEMO), Desert Research and Technology Studies (DRATS/RATS), International Space Station Test-bed for Analog Research (ISTAR), Pavilion Lake Research Project (PLRP), Mars 520, JPL Mars Orbiters/Rovers, Advanced Mission Operations (AMO), Devon Island analog missions, and Apollo experiences. Additionally, the meeting attempted to capture all of the various functional perspectives via presentations by disciplines including mission operations (flight director and mission planning), communications, crew, Capcom, Extra-Vehicular Activity (EVA), Behavioral Health and Performance (BHP), Medical/Surgeon, Science, Education and Public Outreach (EPO), and data management. The paper summarizes the descriptions and results from each of the activities discussed at the TIM and includes several recommendations captured in the meeting for dealing with time delay in human exploration along with recommendations for future development and studies to address this issue.
Klein, Stanley B.; Robertson, Theresa E.; Delton, Andrew W.
2013-01-01
In a series of papers, Nairne and colleagues have demonstrated that tasks encouraging participants to judge words for relevance to survival led to better recall than did tasks lacking survival relevance. Klein, Robertson, and Delton (2010) presented data suggesting that the future-directed temporal orientation of the survival task (e.g., planning), rather than survival per se, accounts for the good recall found with the task. In the present studies we manipulated the amount of survival and planning processing encouraged by a set of encoding tasks. Participants performed tasks that encouraged processing stimuli for their relevance to (a) both survival and planning, (b) planning, but not survival, or (c) survival but not planning. We predicted, and found, that recall performance associated with tasks encouraging planning (i.e., survival with planning and planning without survival) should exceed tasks that encouraged survival but not planning (i.e., survival without planning). We draw several conclusions. First, planning is a necessary component of the superior recall found in the survival paradigm. Second, memory, from an evolutionary perspective, is inherently prospective—tailored by natural selection to support future decisions and judgements that cannot be known in advance with certainty. PMID:21229456
ERIC Educational Resources Information Center
Morrison, James L.; And Others
The use of futures research to improve a college's ability to deal with changes brought about by social, economic, political, and technological developments is discussed, with attention to new planning strategies and forecasting methods. While traditional long-range planning tracks and forecasts the institution's internal development, strategic…
Testing of the Trim Tab Parametric Model in NASA Langley's Unitary Plan Wind Tunnel
NASA Technical Reports Server (NTRS)
Murphy, Kelly J.; Watkins, Anthony N.; Korzun, Ashley M.; Edquist, Karl T.
2013-01-01
In support of NASA's Entry, Descent, and Landing technology development efforts, testing of Langley's Trim Tab Parametric Models was conducted in Test Section 2 of NASA Langley's Unitary Plan Wind Tunnel. The objectives of these tests were to generate quantitative aerodynamic data and qualitative surface pressure data for experimental and computational validation and aerodynamic database development. Six component force-and-moment data were measured on 38 unique, blunt body trim tab configurations at Mach numbers of 2.5, 3.5, and 4.5, angles of attack from -4deg to +20deg, and angles of sideslip from 0deg to +8deg. Configuration parameters investigated in this study were forebody shape, tab area, tab cant angle, and tab aspect ratio. Pressure Sensitive Paint was used to provide qualitative surface pressure mapping for a subset of these flow and configuration variables. Over the range of parameters tested, the effects of varying tab area and tab cant angle were found to be much more significant than varying tab aspect ratio relative to key aerodynamic performance requirements. Qualitative surface pressure data supported the integrated aerodynamic data and provided information to aid in future analyses of localized phenomena for trim tab configurations.
ENHANCED PRACTICAL PHOTOSYNTHETIC CO2 MITIGATION
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dr. Gregory Kremer; Dr. David J. Bayless; Dr. Morgan Vis
2001-07-25
This quarterly report documents significant achievements in the Enhanced Practical Photosynthetic CO{sub 2} Mitigation project during the period from 4/03/2001 through 7/02/2001. Most of the achievements are milestones in our efforts to complete the tasks and subtasks that constitute the project objectives. Note that this version of the quarterly technical report is a revision to add the reports from subcontractors Montana State and Oak Ridge National Laboratories The significant accomplishments for this quarter include: Development of an experimental plan and initiation of experiments to create a calibration curve that correlates algal chlorophyll levels with carbon levels (to simplify future experimentalmore » procedures); Completion of debugging of the slug flow reactor system, and development of a plan for testing the pressure drop of the slug flow reactor; Design and development of a new bioreactor screen design which integrates the nutrient delivery drip system and the harvesting system; Development of an experimental setup for testing the new integrated drip system/harvesting system; Completion of model-scale bioreactor tests examining the effects of CO{sub 2} concentration levels and lighting levels on Nostoc 86-3 growth rates; Completion of the construction of a larger model-scale bioreactor to improve and expand testing capabilities and initiation of tests; Substantial progress on construction of a pilot-scale bioreactor; and Preliminary economic analysis of photobioreactor deployment. Plans for next quarter's work are included in the conclusions. A preliminary economic analysis is included as an appendix.« less
Future career plans of a cohort of senior doctors working in the National Health Service.
Taylor, Kathryn; Lambert, Trevor; Goldacre, Michael
2008-04-01
To report on the future career plans of senior doctors working in the NHS. Postal questionnaires. All doctors who qualified in 1977 from all UK medical schools. Future plans and whether participants had any unmet needs for advice on how to put their future plans into effect. 25% definitely intended to continue with their current employment on the same basis until they retired; 75% hoped for change. A reduction in working hours was the most commonly desired change; but a substantial percentage also wanted changes in job content. 50% of respondents intended definitely (17%) or probably (33%) to work in the NHS to their normal retirement age; and 37% definitely (20%) or probably (17%) intended to retire early. 48% had made plans, in addition to the standard pension, to facilitate early retirement. The main factors given for considering early retirement were family reasons and wanting more time for leisure, a desire to maintain good health, excessive pressure of work, and disillusionment with NHS changes. A reduction in workload would be the greatest inducement to stay. 31% of respondents reported that they had unmet needs for advice about their future plans. Of these, about half were needs for advice about planning for retirement. Many senior NHS doctors would like to reduce their working hours. Less than a quarter definitely intend to work in the NHS to normal retirement age. Even for senior doctors, advice on career development is needed.
Preliminary test results from the CELSS Test Facility Engineering Development Unit
NASA Technical Reports Server (NTRS)
Kliss, Mark H.; Macelroy, R. D.; Blackwell, C. C.; Borchers, B. A.; Drews, M. E.; Longabaugh, J. R.; Yendler, B. S.; Zografos, A. I.
1994-01-01
As part of the NASA Controlled Ecological Life Support System (CELSS) Program, a CELSS Test Facility (CTF) is being planned for installation on the Space Station. The CTF will be used to provide data on the productivity and efficiency of a variety of CELSS higher plant crops grown in the microgravity environment of the Space Station. Tight environmental control will be maintained while data on gas exchange rates and biomass accumulation rates are collected. In order to obtain an early realistic determination of the subsystem and system requirements necessary to provide the environmental conditions specified for CTF crop productivity experiments, an Engineering Development Unit (EDU) has been designed, constructed and is in the process of subsystem and system testing at NASA Ames Research Center. The EDU is a ground test-bed which will be used to characterize the integrated performance of major subsystem technologies, to evaluate hardware candidates and control strategies required for the CTF, and to further define the ability to meet CTF requirements within present Space Station constraints. This paper reviews the functional requirements for the EDU, and focuses on the performance evaluation and test results of the various subsystems. Preliminary integrated performance results and control system operation are addressed, and plans for future science and technology testing are discussed.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-06-01
The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guidemore » for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.« less
Application of the ACASA model for urban development studies
NASA Astrophysics Data System (ADS)
Marras, S.; Pyles, R. D.; Falk, M.; Snyder, R. L.; Paw U, K. T.; Blecic, I.; Trunfio, G. A.; Cecchini, A.; Spano, D.
2012-04-01
Since urban population is growing fast and urban areas are recognized as the major source of CO2 emissions, more attention has being dedicated to the topic of urban sustainability and its connection with the climate. Urban flows of energy, water and carbon have an important impact on climate change and their quantification is pivotal in the city design and management. Large effort has been devoted to quantitative estimates of the urban metabolism components, and several advanced models have been developed and used at different spatial and temporal scales for this purpose. However, it is necessary to develop suitable tools and indicators to effectively support urban planning and management with the goal of achieving a more sustainable metabolism in the urban environment. In this study, the multilayer model ACASA (Advanced Canopy-Atmosphere-Soil Algorithm) was chosen to simulate the exchanges of heat, water vapour and CO2 within and above urban canopy. After several calibration and evaluation tests over natural and agricultural ecosystems, the model was recently modified for application in urban and peri-urban areas. New equations to account for the anthropogenic contribution to heat exchange and carbon production, as well as key parameterizations of leaf-facet scale interactions to separate both biogenic and anthropogenic flux sources and sinks, were added to test changes in land use or urban planning strategies. The analysis was based on the evaluation of the ACASA model performance in estimating urban metabolism components at local scale. Simulated sensible heat, latent heat, and carbon fluxes were compared with in situ Eddy Covariance measurements collected in the city centre of Florence (Italy). Statistical analysis was performed to test the model accuracy and reliability. Model sensitivity to soil types and increased population density values was conducted to investigate the potential use of ACASA for evaluating the impact of planning alternative scenarios. In this contest, an in progress application of ACASA for estimating carbon exchanges alternative scenarios is represented by its integration in a software framework composed by: (i) a Cellular Automata model to simulate the urban land-use dynamics; (ii) a transportation model, able to estimate the variation of the transportation network load; (iii) the ACASA model, and (iv) the mesoscale weather model WRF for the estimation of the relevant urban metabolism components at regional scale. The CA module is able to produce future land use maps, which represent a spatial distribution of the aggregate land-use demand consistent with the main rules governing the functioning of an urban system. Such future land use maps, together with the street network including the current traffic data, are used by the transportation module for estimating future traffic data coherent with the assumed land uses trends. All these information are then used by the coupled model WRF-ACASA for estimating future maps of CO2 fluxes in the urban area under consideration, allowing to estimate the impact of future planning strategies in reducing C emissions. The in-progress application of this system to the city of Florence is presented here.
Help Create the Future by Becoming a Part-Time Futurist.
ERIC Educational Resources Information Center
Cufaude, Jeffrey; Richard, Ron, Illus.
2002-01-01
Describes core practices of planning for the future that can be employed by college union staffs: assessing one's outlook, environmental scanning, scenarios planning, broadening perspectives, searching for opportunities, and continuously innovating. (EV)
Baseline Testing of the EV Global E-Bike SX
NASA Technical Reports Server (NTRS)
Eichenherg, Dennis J.; Kolacz, John S.; Tavernelli, Paul F.
2001-01-01
The NASA John H. Glenn Research Center initiated baseline testing of the EV Global E-Bike SX as an update of the state of the art in hybrid electric bicycles. The E-bike is seen as a way to reduce pollution in urban areas, reduce fossil fuel consumption, and reduce operating costs for transportation systems. The work was done under the Hybrid Power Management (HPM) Program, which includes the Hybrid Electric Transit Bus (HETB). The SX is a high performance, state of the art, ground up, hybrid electric bicycle. Unique features of the SX's 36 V power system include the use of an efficient, 400 W, electric hub motor, and a seven-speed derailleur system that permits operation as fully electric, fully pedal, or a combination of the two. Other innovative features, such as regenerative braking through ultracapacitor energy storage, are planned. Regenerative braking recovers much of the kinetic energy of the vehicle during deceleration. The E-Bike is an inexpensive approach to advance the state of the art in hybrid technology in a practical application. The project transfers space technology to terrestrial use via nontraditional partners, and provides power system data valuable for future space applications. A description of the SX, the results of performance testing, and future vehicle development plans are given in this report. The report concludes that the SX provides excellent performance, and that the implementation of ultracapacitors in the power system can provide significant performance improvements.
Solid waste management complex site development plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greager, T.M.
1994-09-30
The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30more » years so that future facilities and infrastructure will be properly integrated.« less
Technology for the future - Long range planning for space technology development
NASA Technical Reports Server (NTRS)
Collier, Lisa D.; Breckenridge, Roger A.; Llewellyn, Charles P.
1992-01-01
NASA's Office of Aeronautics and Space Technology (OAST) has begun the definition of an Integrated Technology Plan for the civilian space program which guides long-term technology development for space platforms, in light of continuing marker research and other planning data. OAST has conferred particular responsibility for future candidate space mission evaluations and platform performance requirement projections to NASA-Langley. An implementation plan is devised which is amenable to periodic space-platform technology updates.
Strategic planning: today's hot buttons.
Bohlmann, R C
1998-01-01
The first generation of mergers and managed care hasn't slowed down group practices' need for strategic planning. Even groups that already went through one merger are asking about new mergers or ownership possibilities, the future of managed care, performance standards and physician unhappiness. Strategic planning, including consideration of bench-marking, production of ancillary services and physician involvement, can help. Even if only a short, general look at the future, strategic planning shows the proactive leadership needed in today's environment.
ERIC Educational Resources Information Center
Douglass, John Aubrey
2010-01-01
In 1960, California developed a "master plan" for its already famed public higher education system. It was and continues to be arguably the single most influential effort to plan the future of a system of higher education in the annals of American higher education. Despite popular belief, however, the California Master Plan for Higher…
Observing strategies for future solar facilities: the ATST test case
NASA Astrophysics Data System (ADS)
Uitenbroek, H.; Tritschler, A.
2012-12-01
Traditionally solar observations have been scheduled and performed very differently from night time efforts, in particular because we have been observing the Sun for a long time, requiring new combinations of observables to make progress, and because solar physics observations are often event driven on time scales of hours to days. With the proposal pressure that is expected for new large-aperture facilities, we can no longer afford the time spent on custom setups, and will have to rethink our scheduling and operations. We will discuss our efforts at Sac Peak in preparing for this new era, and outline the planned scheduling and operations planning for the ATST in particular.
Augmented reality in neurosurgery
Tagaytayan, Raniel; Kelemen, Arpad
2016-01-01
Neurosurgery is a medical specialty that relies heavily on imaging. The use of computed tomography and magnetic resonance images during preoperative planning and intraoperative surgical navigation is vital to the success of the surgery and positive patient outcome. Augmented reality application in neurosurgery has the potential to revolutionize and change the way neurosurgeons plan and perform surgical procedures in the future. Augmented reality technology is currently commercially available for neurosurgery for simulation and training. However, the use of augmented reality in the clinical setting is still in its infancy. Researchers are now testing augmented reality system prototypes to determine and address the barriers and limitations of the technology before it can be widely accepted and used in the clinical setting. PMID:29765445
Augmented reality in neurosurgery.
Tagaytayan, Raniel; Kelemen, Arpad; Sik-Lanyi, Cecilia
2018-04-01
Neurosurgery is a medical specialty that relies heavily on imaging. The use of computed tomography and magnetic resonance images during preoperative planning and intraoperative surgical navigation is vital to the success of the surgery and positive patient outcome. Augmented reality application in neurosurgery has the potential to revolutionize and change the way neurosurgeons plan and perform surgical procedures in the future. Augmented reality technology is currently commercially available for neurosurgery for simulation and training. However, the use of augmented reality in the clinical setting is still in its infancy. Researchers are now testing augmented reality system prototypes to determine and address the barriers and limitations of the technology before it can be widely accepted and used in the clinical setting.
Key Questions in Building Defect Prediction Models in Practice
NASA Astrophysics Data System (ADS)
Ramler, Rudolf; Wolfmaier, Klaus; Stauder, Erwin; Kossak, Felix; Natschläger, Thomas
The information about which modules of a future version of a software system are defect-prone is a valuable planning aid for quality managers and testers. Defect prediction promises to indicate these defect-prone modules. However, constructing effective defect prediction models in an industrial setting involves a number of key questions. In this paper we discuss ten key questions identified in context of establishing defect prediction in a large software development project. Seven consecutive versions of the software system have been used to construct and validate defect prediction models for system test planning. Furthermore, the paper presents initial empirical results from the studied project and, by this means, contributes answers to the identified questions.
Air-to-air radar flight testing
NASA Astrophysics Data System (ADS)
Scott, Randall E.
1988-06-01
This volume in the AGARD Flight Test Techniques Series describes flight test techniques, flight test instrumentation, ground simulation, data reduction and analysis methods used to determine the performance characteristics of a modern air-to-air (a/a) radar system. Following a general coverage of specification requirements, test plans, support requirements, development and operational testing, and management information systems, the report goes into more detailed flight test techniques covering a/a radar capabilities of: detection, manual acquisition, automatic acquisition, tracking a single target, and detection and tracking of multiple targets. There follows a section on additional flight test considerations such as electromagnetic compatibility, electronic countermeasures, displays and controls, degraded and backup modes, radome effects, environmental considerations, and use of testbeds. Other sections cover ground simulation, flight test instrumentation, and data reduction and analysis. The final sections deal with reporting and a discussion of considerations for the future and how they may affect radar flight testing.
Maintaining technical excellence requires a national plan
NASA Technical Reports Server (NTRS)
Davidson, T. F.
1991-01-01
To meet the challenge of technical excellence, AIA established a rocket propulsion committee to develop the National Rocket Propulsion Strategic Plan. Developing such a plan required a broad spectrum of experience and disciplines. The Strategic Plan team needed the participation of industry, government, and academia. The plan provides, if followed, a means for the U.S. to maintain technical excellence and world leadership in rocket propulsion. To implement the National Rocket Propulsion Strategic Plan is to invest in the social, economic, and technological futures of America. The plan lays the basis for upgrading existing propulsion systems and a firm base for future full scale development, production, and operation of rocket propulsion systems for space, defense, and commercial applications.
Rogers, Mary E; Creed, Peter A
2011-02-01
This study used social cognitive career theory (Lent, Brown, & Hackett, 1994), as a framework to investigate predictors of career choice actions, operationalised as career planning and career exploration. The model was tested cross-sectionally and longitudinally with 631 high school students enrolled in Grades 10-12. Students completed measures of self-efficacy, outcome expectations, goals, supports and personality. Results of the hierarchical regression analyses indicated strong support for self-efficacy and goals predicting career planning and exploration across all grades at T1, and predicting change in career planning and exploration from T1 to T2. Whilst support for pathways among other predictor variables (personality, contextual influences and biographic variables) to choice actions was found, these pathways varied across grades at T1, and also from T1 to T2. Implications for social cognitive career theory, career counselling practice and future research are discussed. Copyright © 2010 The Association for Professionals in Services for Adolescents. Published by Elsevier Ltd. All rights reserved.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... America Fund; a National Broadband Plan for Our Future; Establishing Just and Reasonable Rates for Local Exchange Carriers; High-Cost Universal Service Support; Correction AGENCY: Federal Communications...
Using Future Trends to Inform Planning/Marketing.
ERIC Educational Resources Information Center
Nichols, John V.
1995-01-01
Explores the reasons for incorporating trend analysis of librarianship into library planning and marketing. Key financial and technological issues are reviewed, and the techniques of environmental scanning and alternative scenario-building to incorporate future trends are discussed. (AEF)
Examining current or future trade-offs for biodiversity conservation in north-eastern Australia.
Reside, April E; VanDerWal, Jeremy; Moilanen, Atte; Graham, Erin M
2017-01-01
With the high rate of ecosystem change already occurring and predicted to occur in the coming decades, long-term conservation has to account not only for current biodiversity but also for the biodiversity patterns anticipated for the future. The trade-offs between prioritising future biodiversity at the expense of current priorities must be understood to guide current conservation planning, but have been largely unexplored. To fill this gap, we compared the performance of four conservation planning solutions involving 662 vertebrate species in the Wet Tropics Natural Resource Management Cluster Region in north-eastern Australia. Input species data for the four planning solutions were: 1) current distributions; 2) projected distributions for 2055; 3) projected distributions for 2085; and 4) current, 2055 and 2085 projected distributions, and the connectivity between each of the three time periods for each species. The four planning solutions were remarkably similar (up to 85% overlap), suggesting that modelling for either current or future scenarios is sufficient for conversation planning for this region, with little obvious trade-off. Our analyses also revealed that overall, species with small ranges occurring across steep elevation gradients and at higher elevations were more likely to be better represented in all solutions. Given that species with these characteristics are of high conservation significance, our results provide confidence that conservation planning focused on either current, near- or distant-future biodiversity will account for these species.
Examining current or future trade-offs for biodiversity conservation in north-eastern Australia
VanDerWal, Jeremy; Moilanen, Atte; Graham, Erin M.
2017-01-01
With the high rate of ecosystem change already occurring and predicted to occur in the coming decades, long-term conservation has to account not only for current biodiversity but also for the biodiversity patterns anticipated for the future. The trade-offs between prioritising future biodiversity at the expense of current priorities must be understood to guide current conservation planning, but have been largely unexplored. To fill this gap, we compared the performance of four conservation planning solutions involving 662 vertebrate species in the Wet Tropics Natural Resource Management Cluster Region in north-eastern Australia. Input species data for the four planning solutions were: 1) current distributions; 2) projected distributions for 2055; 3) projected distributions for 2085; and 4) current, 2055 and 2085 projected distributions, and the connectivity between each of the three time periods for each species. The four planning solutions were remarkably similar (up to 85% overlap), suggesting that modelling for either current or future scenarios is sufficient for conversation planning for this region, with little obvious trade-off. Our analyses also revealed that overall, species with small ranges occurring across steep elevation gradients and at higher elevations were more likely to be better represented in all solutions. Given that species with these characteristics are of high conservation significance, our results provide confidence that conservation planning focused on either current, near- or distant-future biodiversity will account for these species. PMID:28222199
Planning for the Future, a Look from Apollo to the Present
NASA Technical Reports Server (NTRS)
Segrera, David
2008-01-01
Future missions out of low Earth orbit, returning to the moon and Mars, will be some of the most complicated endeavors ever attempted by mankind. It will require the wealth of nations and the dedicated efforts of thousand of individuals working in a concerted effort to take man to the moon, Mars and beyond. These missions will require new equipment and new approaches to optimize our limited resources and time in space. This daily planning and optimization which currently is being performed by scores of people in MCC Houston and around the world will need to adapt to the challenges faced far from Earth. By studying the processes, methodologies, and tools employed from Apollo, Skylab, Shuttle, ISS, and other programs such as NEEMO, we can learn from the past to plan for the future. This paper will explore the planning process used from Apollo onward and will discuss their relevancy in future applications.
Planning Schools for 2050? First, Let's Get "Now" Right
ERIC Educational Resources Information Center
Hill, Franklin
2010-01-01
For 20 years, the author has promoted constructing today's schools with the future in mind, yet as many school districts begin planning for the year 2050, he is starting to think this foresight/forethought might actually be a distracting course of action. Some districts may try to plan so far into the future that they neglect the present. But,…
The Use of Planning in English and German (NRW) Geography School Textbooks
ERIC Educational Resources Information Center
Maier, Veit; Budke, Alexandra
2016-01-01
Although it is not possible to predict the future, at least some ideas can be developed through planning. Geography focuses on current social, environmental and spatial problems; however, it should, at the same time, teach us to plan its future handling. At school, this is a responsible role for the subject geography. This article compares how…
High specific energy, high capacity nickel-hydrogen cell design
NASA Technical Reports Server (NTRS)
Wheeler, James R.
1993-01-01
A 3.5 inch rabbit-ear-terminal nickel-hydrogen cell has been designed and tested to deliver high capacity at a C/1.5 discharge rate. Its specific energy yield of 60.6 wh/kg is believed to be the highest yet achieved in a slurry-process nickel-hydrogen cell, and its 10 C capacity of 113.9 AH the highest capacity yet made at a discharge rate this high in the 3.5 inch diameter size. The cell also demonstrated a pulse capability of 180 amps for 20 seconds. Specific cell parameters, performance, and future test plans are described.
NASA tire/runway friction projects
NASA Technical Reports Server (NTRS)
Yager, Thomas J.
1995-01-01
The paper reviews several aspects of NASA Langley Research Center's tire/runway friction evaluations directed towards improving the safety and economy of aircraft ground operations. The facilities and test equipment used in implementing different aircraft tire friction studies and other related aircraft ground performance investigations are described together with recent workshop activities at NASA Wallops Flight Facility. An overview of the pending Joint NASA/Transport Canada/FM Winter Runway Friction Program is given. Other NASA ongoing studies and on-site field tests are discussed including tire wear performance and new surface treatments. The paper concludes with a description of future research plans.
2005-05-01
simulée d’essai pour obtenir les diagrammes de perte de transmission et de réverbération pour 18 éléments (une source, un réseau remorqué et 16 bouées...were recorded using a 1.5GHz Pentium 4 processor. The test results indicate that the Bellhop program runs fast enough to provide the required acoustic...was determined that the Bellhop program will be fast enough for these clients. Future Plans It is intended to integrate further enhancements that
NASA Technical Reports Server (NTRS)
Hogenson, P. A.; Lu, Tina
1995-01-01
The objective is to develop the advanced thermal seals to a technology readiness level (TRL) of 6 to support the rapid turnaround time and low maintenance requirements of the X-33 and the future reusable launch vehicle (RLV). This program is divided into three subtasks: (1) orbiter thermal seals operation history review; (2) material, process, and design improvement; and (3) fabrication and evaluation of the advanced thermal seals.
An Overview of the Annual NASA Tire/Runway Friction Workshop and Lessons Learned
NASA Technical Reports Server (NTRS)
Yager, Thomas J.
2005-01-01
This paper summarizes the organization efforts, objectives, scope, agenda, test procedures and results from eleven years of conducting the NASA Tire/Runway Friction Workshop. The paper will also summarize the lessons learned between 1994 and 2004. A description of the various friction, texture and roughness equipment used during these workshops at NASA Wallops Flight Facility on the eastern shore of Virginia will be provided together with the range of test surfaces available for evaluation. The need for friction measuring equipment calibration centers is discussed and plans for future workshops are identified.
Durability of ITO-MgF2 Films for Space-Inflatable Polymer Structures
NASA Technical Reports Server (NTRS)
Kerslake, Thomas W.; Waters, Deborah L.; Schieman, David A.; Hambourger, Paul D.
2003-01-01
This paper presents results from ITO-MgF2 film durability evaluations that included tape peel, fold, thermal cycle, and AO exposure testing. Polymer coupon preparation is described as well as ITO-MgF2 film deposition equipment, procedures and film characterization. Durability testing methods are also described. The pre- and post-test condition of the films is assessed visually, microscopically, and electrically. Results show that at 500 ITO - 9 vol% MgF2 film is suitable to protect polymer surfaces, such as those used in space-inflatable structures of the PowerSphere microsatellite concept, during a 1-year Earth orbiting mission. Future plans for ground-based and orbital testing of this film are also discussed.
2014-09-25
CAPE CANAVERAL, Fla. – Operations are underway to couple Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 on the track alongside the Indian River, north of Launch Complex 39 at NASA’s Kennedy Space Center in Florida. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
2014-09-25
CAPE CANAVERAL, Fla. – Coupled Florida East Coast Railway, or FEC, locomotives No. 433 and No. 428 pass the Vehicle Assembly Building in Launch Complex 39 at NASA’s Kennedy Space Center in Florida on their way to NASA's Locomotive Maintenance Facility. Kennedy's Center Planning and Development Directorate has enlisted the locomotives to support a Rail Vibration Test for the Canaveral Port Authority. The purpose of the test is to collect amplitude, frequency and vibration test data utilizing two Florida East Coast locomotives operating on KSC tracks to ensure that future railroad operations will not affect launch vehicle processing at the center. Buildings instrumented for the test include the Rotation Processing Surge Facility, Thermal Protection Systems Facility, Vehicle Assembly Building, Orbiter Processing Facility and Booster Fabrication Facility. Photo credit: NASA/Daniel Casper
The 1989 long-range program plan
NASA Technical Reports Server (NTRS)
1988-01-01
The President's National Space Policy of 1988 reaffirms that space activities serve a variety of vital national goals and objectives, including the strengthening of U.S. scientific, technological, political, economic, and international leadership. The new policy stresses that civil space activities contribute significantly to enhancing America's world leadership. Goals and objectives must be defined and redefined, and each advance toward a given objective must be viewed as a potential building block for future programs. This important evolutionary process for research and development is reflected, describing NASA's program planning for FY89 and later years. This plan outlines the direction of NASA's future activities by discussing goals, objectives, current programs, and plans for the future. The 1989 plan is consistent with national policy for both space and aeronautics, and with the FY89 budget that the President submitted to Congress in February 1988.
Test tools and test data for the future EUMETSAT EPS-SG platform
NASA Astrophysics Data System (ADS)
Khlystova, Iryna; Sunda, Michela
2017-04-01
The EUMETSAT Polar System - Second Generation (EPS-SG) represents Europe's contribution to the future Joint Polar System (JPS), which is planned to be established together with the National Oceanic and Atmospheric Administration (NOAA) of the United States, following on from the Initial Joint Polar System (IJPS). Due to its global coverage and the variety of passive and active sensors on the EPS-SG platform, a significant positive impact on Numerical Weather Prediction (NWP) can be expected for all forecasts based on NWP in the 2020-2040 time frame. It will increase direct socio-economic benefits to Member States and leverage additional benefits through its integration into the JPS and cooperation in the context of CGMS and WMO. For the EUMETSAT will develop the EPS-SG overall system of satellites and the Overall Ground Segment (OGS) and be responsible for the Payload Data Acquisition and Processing (PDAP) system. This will include all the functionality dedicated to the L0, L1 and L2 Operational Processor, for generation of the near-real time L1 and L2 mission central products. Also the European Space Agency will develop the EPS-SG satellites and a number of instruments, with CNES and DLR playing a key role. The general processing chain should be in place and be extensively tested before the first data set is sent from the space platform to the ground. For this, numerous test tools, such as satellite data simulators (IDS) and processors prototypes (GPPs and IPPs) need to be developed and operated before the launch of the satellites. EUMETSAT cooperated with several European agencies in order to provide all the testing items in time. Here, we present the insight into the EPS-SG the logic of the test tools for the generation of the test data and provide insights into the modern space-based mission planning and preparation activities.
NASA Technical Reports Server (NTRS)
Delgado, Irebert R.; Handschuh, Michael J.
2010-01-01
Component tests were conducted on spring-loaded Teflon seals to determine their performance in keeping lunar simulant out of mechanical component gearbox, motor, and bearing housings. Baseline tests were run in a dry-room without simulant for 10,000 cycles to determine wear effects of the seal against either anodized aluminum or stainless steel shafts. Repeat tests were conducted using lunar simulants JSC-1A and LHT-2M. Finally, tests were conducted with and without simulant in vacuum at ambient temperature. Preliminary results indicate minimal seal and shaft wear through 10,000 cycles, and more importantly, no simulant was observed to pass through the seal-shaft interface. Future endurance tests are planned at relevant NASA Lunar Surface System architecture shaft sizes and operating conditions.
Vale, Mariana M; Souza, Thiago V; Alves, Maria Alice S; Crouzeilles, Renato
2018-01-01
A key strategy in biodiversity conservation is the establishment of protected areas. In the future, however, the redistribution of species in response to ongoing climate change is likely to affect species' representativeness in those areas. Here we quantify the effectiveness of planning protected areas network to represent 151 birds endemic to the Brazilian Atlantic Forest hotspot, under current and future climate change conditions for 2050. We combined environmental niche modeling and systematic conservation planning using both a county and a regional level planning strategy. We recognized the conflict between biodiversity conservation and economic development, including socio-economic targets (as opposed to biological only) and using planning units that are meaningful for policy-makers. We estimated an average contraction of 29,500 km 2 in environmentally suitable areas for birds, representing 52% of currently suitable areas. Still, the most cost-effective solution represented almost all target species, requiring only ca. 10% of the Atlantic Forest counties to achieve that representativeness, independent of strategy. More than 50% of these counties were selected both in the current and future planned networks, representing >83% of the species. Our results indicate that: (i) planning protected areas network currently can be useful to represent species under climate change; (ii) the overlapped planning units in the best solution for both current and future conditions can be considered as "no regret" areas; (iii) priority counties are spread throughout the biome, providing specific guidance wherever the possibility of creating protected area arises; and (iv) decisions can occur at different administrative spheres (Federal, State or County) as we found quite similar numerical solutions using either county or regional level strategies.
Souza, Thiago V.; Alves, Maria Alice S.; Crouzeilles, Renato
2018-01-01
Background A key strategy in biodiversity conservation is the establishment of protected areas. In the future, however, the redistribution of species in response to ongoing climate change is likely to affect species’ representativeness in those areas. Here we quantify the effectiveness of planning protected areas network to represent 151 birds endemic to the Brazilian Atlantic Forest hotspot, under current and future climate change conditions for 2050. Methods We combined environmental niche modeling and systematic conservation planning using both a county and a regional level planning strategy. We recognized the conflict between biodiversity conservation and economic development, including socio-economic targets (as opposed to biological only) and using planning units that are meaningful for policy-makers. Results We estimated an average contraction of 29,500 km2 in environmentally suitable areas for birds, representing 52% of currently suitable areas. Still, the most cost-effective solution represented almost all target species, requiring only ca. 10% of the Atlantic Forest counties to achieve that representativeness, independent of strategy. More than 50% of these counties were selected both in the current and future planned networks, representing >83% of the species. Discussion Our results indicate that: (i) planning protected areas network currently can be useful to represent species under climate change; (ii) the overlapped planning units in the best solution for both current and future conditions can be considered as “no regret” areas; (iii) priority counties are spread throughout the biome, providing specific guidance wherever the possibility of creating protected area arises; and (iv) decisions can occur at different administrative spheres (Federal, State or County) as we found quite similar numerical solutions using either county or regional level strategies. PMID:29844952
Low Impact Development Master Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loftin, Samuel R.
This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.
Latest Sensors and Data Acquisition Development Efforts at KSC
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2002-01-01
This viewgraph presentation summarizes the characteristics required on sensors by consumers desiring access to space, a long term plan developed at KSC (Kennedy Space Center) to identify promising technologies for NASA's own future sensor needs, and the characteristics of several smart sensors already developed. Also addressed are the computer hardware and architecture used to operate sensors, and generic testing capabilities. Consumers desire sensors which are lightweight, inexpensive, intelligent, and easy to use.
U.S. Nuclear Weapons Enterprise: A Strategic Past and Unknown Future
2012-04-25
are left to base their planning assumptions, weapons designs and capabilities on outdated models . The likelihood of a large-scale nuclear war has...conduct any testing on nuclear weapons and must rely on computer modeling . While this may provide sufficient confidence in the current nuclear...unlikely the world will be free of nuclear weapons. 24 APPENDIX A – Acronyms ACC – Air Combat Command ACM – Advanced cruise missle CSAF
NASA Astrophysics Data System (ADS)
Walker, Jonathan; Heinrich, Jonathon; Font, Gabriel; Ebersohn, Frans; Garrett, Michael
2017-10-01
A 100 kW class lanthanum-hexaboride plasma source is under continuing development for the Lockheed Martin Compact Fusion Reactor program. The current experiment, T4B, has become a test bed for plasma source operation with the goal of creating a high density plasma target for neutral beam heating. We present operation and performance of different plasma source geometries, results of plasma source coupling, and future plasma source development plans. ©2017 Lockheed Martin Corporation. All Rights Reserved.
Till, Charlotte; Haverkamp, Jamie; White, Devin; ...
2016-11-22
Climate change has the potential to displace large populations in many parts of the developed and developing world. Understanding why, how, and when environmental migrants decide to move is critical to successful strategic planning within organizations tasked with helping the affected groups, and mitigating their systemic impacts. One way to support planning is through the employment of computational modeling techniques. Models can provide a window into possible futures, allowing planners and decision makers to test different scenarios in order to understand what might happen. While modeling is a powerful tool, it presents both opportunities and challenges. This paper builds amore » foundation for the broader community of model consumers and developers by: providing an overview of pertinent climate-induced migration research, describing some different types of models and how to select the most relevant one(s), highlighting three perspectives on obtaining data to use in said model(s), and the consequences associated with each. It concludes with two case studies based on recent research that illustrate what can happen when ambitious modeling efforts are undertaken without sufficient planning, oversight, and interdisciplinary collaboration. Lastly, we hope that the broader community can learn from our experiences and apply this knowledge to their own modeling research efforts.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Till, Charlotte; Haverkamp, Jamie; White, Devin
Climate change has the potential to displace large populations in many parts of the developed and developing world. Understanding why, how, and when environmental migrants decide to move is critical to successful strategic planning within organizations tasked with helping the affected groups, and mitigating their systemic impacts. One way to support planning is through the employment of computational modeling techniques. Models can provide a window into possible futures, allowing planners and decision makers to test different scenarios in order to understand what might happen. While modeling is a powerful tool, it presents both opportunities and challenges. This paper builds amore » foundation for the broader community of model consumers and developers by: providing an overview of pertinent climate-induced migration research, describing some different types of models and how to select the most relevant one(s), highlighting three perspectives on obtaining data to use in said model(s), and the consequences associated with each. It concludes with two case studies based on recent research that illustrate what can happen when ambitious modeling efforts are undertaken without sufficient planning, oversight, and interdisciplinary collaboration. Lastly, we hope that the broader community can learn from our experiences and apply this knowledge to their own modeling research efforts.« less
Solar array electrical performance assessment for Space Station Freedom
NASA Technical Reports Server (NTRS)
Smith, Bryan K.; Brisco, Holly
1993-01-01
Electrical power for Space Station Freedom will be generated by large Photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis, and test data to date. A description of the LMSC performance model, future test plans, and predicted performance ranges are also given.
Solar array electrical performance assessment for Space Station Freedom
NASA Technical Reports Server (NTRS)
Smith, Bryan K.; Brisco, Holly
1993-01-01
Electrical power for Space Station Freedom will be generated by large photovoltaic arrays with a beginning of life power requirement of 30.8 kW per array. The solar arrays will operate in a Low Earth Orbit (LEO) over a design life of fifteen years. This paper provides an analysis of the predicted solar array electrical performance over the design life and presents a summary of supporting analysis and test data for the assigned model parameters and performance loss factors. Each model parameter and loss factor is assessed based upon program requirements, component analysis and test data to date. A description of the LMSC performance model future test plans and predicted performance ranges are also given.
TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stefanko, D.; Langton, C.
2012-01-03
High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less
Optimism and Planning for Future Care Needs among Older Adults
Sörensen, Silvia; Hirsch, Jameson K.; Lyness, Jeffrey M.
2015-01-01
Aging is associated with an increase in need for assistance. Preparation for future care (PFC) is related to improved coping ability as well as better mental and physical health outcomes among older adults. We examined the association of optimism with components of PFC among older adults. We also explored race differences in the relationship between optimism and PFC. In Study 1, multiple regression showed that optimism was positively related to concrete planning. In Study 2, optimism was related to gathering information. An exploratory analysis combining the samples yielded a race interaction: For Whites higher optimism, but for Blacks lower optimism was associated with more planning. High optimism may be a barrier to future planning in certain social and cultural contexts. PMID:26045699
Principles of effective USA federal fire management plans
Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.
2015-01-01
Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.
ERIC Educational Resources Information Center
Finn, Brian
2006-01-01
For most families, financial planning involves paying the monthly bills while putting money aside for the children's college funds and the parents' retirement. However, for parents of children with special needs, planning often takes on a very different meaning. Ensuring that children will have the resources to meet their financial, educational,…
A Year in the Life of International Space Station
NASA Technical Reports Server (NTRS)
Uri, John J.
2006-01-01
The past twelve months (October 2005 to September 2006) have been among the busiest in the life of the International Space Station (ISS), both in terms of on-orbit operations as well as future planning, for both ISS systems and research. The Expedition 12 and 13 crews completed their missions successfully, carrying out research for Russia, the United States, Europe and Japan, and bringing continuous ISS occupancy to nearly six years. The European Space Agency's (ESA) first Long Duration Mission on ISS is underway, involving significant international research. The Expedition 14 crew completed its training and is embarking on its own 6-month mission with a full slate of international research. Future crews are in training for their respective assembly and research missions. Shuttle flights resumed after a 10-month hiatus, delivering new research facilities and resuming assembly of ISS. ESA's Columbus research module was delivered to the Kennedy Space Center, joining Japan's Kibo research module already there. Following preflight testing, the two modules will launch in 2007 and 2008, respectively, joining Destiny as ISS's research infrastructure. A revised ISS configuration and assembly sequence were endorsed by all the Partners, with a reduced number of Shuttle flights, but for the first time including plans for post-Shuttle ISS operations after 2010. The new plan will pose significant challenges to the ISS research community. As Europe and Japan build their on-orbit research infrastructure, and long-term plans become firmer, the next 12 months should prove to be equally challenging and exciting.
WE-A-BRE-01: Debate: To Measure or Not to Measure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moran, J; Miften, M; Mihailidis, D
2014-06-15
Recent studies have highlighted some of the limitations of patient-specific pre-treatment IMRT QA measurements with respect to assessing plan deliverability. Pre-treatment QA measurements are frequently performed with detectors in phantoms that do not involve any patient heterogeneities or with an EPID without a phantom. Other techniques have been developed where measurement results are used to recalculate the patient-specific dose volume histograms. Measurements continue to play a fundamental role in understanding the initial and continued performance of treatment planning and delivery systems. Less attention has been focused on the role of computational techniques in a QA program such as calculation withmore » independent dose calculation algorithms or recalculation of the delivery with machine log files or EPID measurements. This session will explore the role of pre-treatment measurements compared to other methods such as computational and transit dosimetry techniques. Efficiency and practicality of the two approaches will also be presented and debated. The speakers will present a history of IMRT quality assurance and debate each other regarding which types of techniques are needed today and for future quality assurance. Examples will be shared of situations where overall quality needed to be assessed with calculation techniques in addition to measurements. Elements where measurements continue to be crucial such as for a thorough end-to-end test involving measurement will be discussed. Operational details that can reduce the gamma tool effectiveness and accuracy for patient-specific pre-treatment IMRT/VMAT QA will be described. Finally, a vision for the future of IMRT and VMAT plan QA will be discussed from a safety perspective. Learning Objectives: Understand the advantages and limitations of measurement and calculation approaches for pre-treatment measurements for IMRT and VMAT planning Learn about the elements of a balanced quality assurance program involving modulated techniques Learn how to use tools and techniques such as an end-to-end test to enhance your IMRT and VMAT QA program.« less
Human Exploration of Mars Design Reference Architecture 5.0
NASA Technical Reports Server (NTRS)
Drake, Bret G.
2010-01-01
This paper provides a summary of the Mars Design Reference Architecture 5.0 (DRA 5.0), which is the latest in a series of NASA Mars reference missions. It provides a vision of one potential approach to human Mars exploration. The reference architecture provides a common framework for future planning of systems concepts, technology development, and operational testing as well as Mars robotic missions, research that is conducted on the International Space Station, and future lunar exploration missions. This summary the Mars DRA 5.0 provides an overview of the overall mission approach, surface strategy and exploration goals, as well as the key systems and challenges for the first three human missions to Mars.
Tank System Integrated Model: A Cryogenic Tank Performance Prediction Program
NASA Technical Reports Server (NTRS)
Bolshinskiy, L. G.; Hedayat, A.; Hastings, L. J.; Sutherlin, S. G.; Schnell, A. R.; Moder, J. P.
2017-01-01
Accurate predictions of the thermodynamic state of the cryogenic propellants, pressurization rate, and performance of pressure control techniques in cryogenic tanks are required for development of cryogenic fluid long-duration storage technology and planning for future space exploration missions. This Technical Memorandum (TM) presents the analytical tool, Tank System Integrated Model (TankSIM), which can be used for modeling pressure control and predicting the behavior of cryogenic propellant for long-term storage for future space missions. Utilizing TankSIM, the following processes can be modeled: tank self-pressurization, boiloff, ullage venting, mixing, and condensation on the tank wall. This TM also includes comparisons of TankSIM program predictions with the test data andexamples of multiphase mission calculations.
Long-term care planning and preparation among persons with multiple sclerosis.
Putnam, Michelle; Tang, Fengyan
2008-01-01
Individuals with multiple sclerosis (MS) primarily rely on informal supports such as family members and assistive technology to meet their daily needs. As they age, formal supports may become important to compliment these supports and sustain community-based living. No previous research exists exploring plans and preparations of persons with MS for future independent living and long-term care needs. We analyzed data from a random sample survey (N = 580) to assess knowledge and perceptions of future service needs using ANOVA, chi-square, correlations, and MANOVA procedures. Results indicate that overall, most respondents are not well informed and have not planned or prepared for future care needs. Persons reporting severe MS were more likely to plan and prepare. Key "entry points" for making preparations include receiving specific education and planning information, discussions with family and professional service providers, and increased age, education, and income. We recommend greater infusion of long-term care planning into these existing entry points and creation of new entry points including healthcare provides and insurers.
NASA Astrophysics Data System (ADS)
Ogawa, Kenta; Konno, Yukiko; Yamamoto, Satoru; Matsunaga, Tsuneo; Tachikawa, Tetsushi; Komoda, Mako; Kashimura, Osamu; Rokugawa, Shuichi
2016-10-01
Hyperspectral Imager Suite (HISUI)[1] is a Japanese future spaceborne hyperspectral instrument being developed by Ministry of Economy, Trade, and Industry (METI) and will be delivered to ISS in 2018. In HISUI project, observation strategy is important especially for hyperspectral sensor, and relationship between the limitations of sensor operation and the planned observation scenarios have to be studied. We have developed concept of multiple algorithms approach. The concept is to use two (or more) algorithm models (Long Strip Model and Score Downfall Model) for selecting observing scenes from complex data acquisition requests with satisfactory of sensor constrains. We have tested the algorithm, and found that the performance of two models depends on remaining data acquisition requests, i.e. distribution score along with orbits. We conclude that the multiple algorithms approach will be make better collection plans for HISUI comparing with single fixed approach.
Core components of a comprehensive quality assurance program in anatomic pathology.
Nakhleh, Raouf E
2009-11-01
In this article the core components of a comprehensive quality assurance and improvement plan are outlined. Quality anatomic pathology work comes with focus on accurate, timely, and complete reports. A commitment to continuous quality improvement and a systems approach with a persistent effort helps to achieve this end. Departments should have a quality assurance and improvement plan that includes a risk assessment of real and potential problems facing the laboratory. The plan should also list the individuals responsible for carrying out the program with adequate resources, a defined timetable, and annual assessment for progress and future directions. Quality assurance monitors should address regulatory requirements and be organized by laboratory division (surgical pathology, cytology, etc) as well as 5 segments (preanalytic, analytic, postanalytic phases of the test cycle, turn-around-time, and customer satisfaction). Quality assurance data can also be used to evaluate individual pathologists using multiple parameters with peer group comparison.
Lucci, A; Citro, H W; Wilson, L
2001-05-15
The incidence of melanoma has increased in the past 10 years more rapidly than any other cancer. Exposure to intense solar radiation in youth significantly increases the lifetime risk of developing melanoma. We postulate that teenagers have little awareness of melanoma prevention or detection principles. The purpose of this study was to assess the knowledge of teenagers about melanoma and to identify which age groups are most receptive to altering their sun exposure behaviors. Two hundred and ten examinations testing general knowledge of sun exposure and melanoma were completed and returned by junior high and high school students ages 12 to 18 in Dallas and Houston, Texas. All students completing and returning the examination were provided with the correct answers to the test and a detailed explanation of each of the test items as part of an educational exercise. A second questionnaire was then administered to determine the effect of the educational exercise on future sun exposure practices. Students were divided into two age groups (12 to 15 and >or=16 years old) for comparison of scores on the knowledge examination and responses to behavioral items. Comparison of response rates between age groups was performed using chi(2) analysis. The return rate was 100%, with 109 students age 12-15 years, and 101 students >or=16 years. Seventy-six percent of all respondents sunbathed outdoors, and 18% had used a tanning bed in the past 6 months. Thirty-three percent of students admitted to at least three blistering sunburns in the past. The average score on the knowledge assessment examination was 65% correct for students >or=16 years old and 54% correct for those 12-15 years old. Students 12 to 15 years old were significantly more likely to indicate they planned to change future behaviors regarding performance of skin self-examinations and limiting sun exposure as compared to the older students. A significant number of teenagers have already enhanced their risk for future melanoma by suffering severe sunburns. Students younger than 16 years of age were significantly more likely to indicate they planned to change future behaviors after receiving information about melanoma. The data from this pilot study support education aimed at younger age groups to most effectively achieve risk reduction and prevent future melanomas. Copyright 2001 Academic Press.
Full-Scale Accident Testing in Support of Used Nuclear Fuel Transportation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durbin, Samuel G.; Lindgren, Eric R.; Rechard, Rob P.
2014-09-01
The safe transport of spent nuclear fuel and high-level radioactive waste is an important aspect of the waste management system of the United States. The Nuclear Regulatory Commission (NRC) currently certifies spent nuclear fuel rail cask designs based primarily on numerical modeling of hypothetical accident conditions augmented with some small scale testing. However, NRC initiated a Package Performance Study (PPS) in 2001 to examine the response of full-scale rail casks in extreme transportation accidents. The objectives of PPS were to demonstrate the safety of transportation casks and to provide high-fidelity data for validating the modeling. Although work on the PPSmore » eventually stopped, the Blue Ribbon Commission on America’s Nuclear Future recommended in 2012 that the test plans be re-examined. This recommendation was in recognition of substantial public feedback calling for a full-scale severe accident test of a rail cask to verify evaluations by NRC, which find that risk from the transport of spent fuel in certified casks is extremely low. This report, which serves as the re-assessment, provides a summary of the history of the PPS planning, identifies the objectives and technical issues that drove the scope of the PPS, and presents a possible path for moving forward in planning to conduct a full-scale cask test. Because full-scale testing is expensive, the value of such testing on public perceptions and public acceptance is important. Consequently, the path forward starts with a public perception component followed by two additional components: accident simulation and first responder training. The proposed path forward presents a series of study options with several points where the package performance study could be redirected if warranted.« less
PV history: Lessons for the future
NASA Technical Reports Server (NTRS)
Ralph, E. L.
1982-01-01
A history of terrestrial photovoltaics is presented indicating that the photovoltaic potential was well perceived and a good technology developent plan was formulated and implemented. Major accomplishments of the technology plan are highlighted. Research objectives and research needs for the future are outlined.
The Future of the Campus: Architecture and Master Planning Trends
ERIC Educational Resources Information Center
Coulson, Jonathan; Roberts, Paul; Taylor, Isabelle
2015-01-01
The article discusses current and likely future trends within the architecture and master planning of university campuses. It argues that higher education administrators must maximise the value of the campus to create physical environments that enhance the student experience.
Review of Transient Testing of Fast Reactor Fuels in the Transient REActor Test Facility (TREAT)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jensen, C.; Wachs, D.; Carmack, J.
The restart of the Transient REActor Test (TREAT) facility provides a unique opportunity to engage the fast reactor fuels community to reinitiate in-pile experimental safety studies. Historically, the TREAT facility played a critical role in characterizing the behavior of both metal and oxide fast reactor fuels under off-normal conditions, irradiating hundreds of fuel pins to support fast reactor fuel development programs. The resulting test data has provided validation for a multitude of fuel performance and severe accident analysis computer codes. This paper will provide a review of the historical database of TREAT experiments including experiment design, instrumentation, test objectives, andmore » salient findings. Additionally, the paper will provide an introduction to the current and future experiment plans of the U.S. transient testing program at TREAT.« less
Development and Testing of a High Stability Engine Control (HISTEC) System
NASA Technical Reports Server (NTRS)
Orme, John S.; DeLaat, John C.; Southwick, Robert D.; Gallops, George W.; Doane, Paul M.
1998-01-01
Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.
Smyth, Christopher C
2007-05-01
Developers of future forces are implementing automated aiding for driving tasks. In designing such systems, the effect of cognitive task interference on driving performance is important. The crew of such vehicles may have to occasionally perform communication and planning tasks while driving. Subjective questionnaires may aid researchers to parse out the sources of task interference in crew station designs. In this preliminary study, sixteen participants drove a vehicle simulator with automated road-turn cues (i.e., visual, audio, combined, or neither) along a course marked on a map display while replying to spoken test questions (i.e., repeating sentences, math and logical puzzles, route planning, or none) and reporting other vehicles in the scenario. Following each trial, a battery of subjective questionnaires was administered to determine the perceived effects of the loading on their cognitive functionality. Considering the performance, the participants drove significantly faster with the road-turn cues than with just the map. They recalled fewer vehicle sightings with the cognitive tests than without them. Questionnaire results showed that their reasoning was more straightforward, the quantity of information for understanding higher, and the trust greater with the combined cues than the map-only. They reported higher perceived workload with the cognitive tests. The capacity for maintaining situational awareness was reduced with the cognitive tests because of the increased division of attention and the increase in the instability, variability, and complexity of the demands. The association and intuitiveness of cognitive processing were lowest and the subjective stress highest for the route planning test. Finally, the confusability in reasoning was greater for the auditory cue with the route planning than the auditory cue without the cognitive tests. The subjective questionnaires are sensitive to the effects of the cognitive loading and, therefore, may be useful for guiding the development of automated aid designs.
NASA Technology Demonstrations Missions Program Overview
NASA Technical Reports Server (NTRS)
Turner, Susan
2011-01-01
The National Aeronautics and Space Administration (NASA) Fiscal Year 2010 (FY10) budget introduced a new strategic plan that placed renewed emphasis on advanced missions beyond Earth orbit. This supports NASA s 2011 strategic goal to create innovative new space technologies for our exploration, science, and economic future. As a result of this focus on undertaking many and more complex missions, NASA placed its attention on a greater investment in technology development, and this shift resulted in the establishment of the Technology Demonstrations Missions (TDM) Program. The TDM Program, within the newly formed NASA Office of the Chief Technologist, supports NASA s grand challenges by providing a steady cadence of advanced space technology demonstrations (Figure 1), allowing the infusion of flexible path capabilities for future exploration. The TDM Program's goal is to mature crosscutting capabilities to flight readiness in support of multiple future space missions, including flight test projects where demonstration is needed before the capability can transition to direct mission The TDM Program has several unique criteria that set it apart from other NASA program offices. For instance, the TDM Office matures a small number of technologies that are of benefit to multiple customers to flight technology readiness level (TRL) 6 through relevant environment testing on a 3-year development schedule. These technologies must be crosscutting, which is defined as technology with potential to benefit multiple mission directorates, other government agencies, or the aerospace industry, and they must capture significant public interest and awareness. These projects will rely heavily on industry partner collaboration, and funding is capped for all elements of the flight test demonstration including planning, hardware development, software development, launch costs, ground operations, and post-test assessments. In order to inspire collaboration across government and industry, more than 70% of the TDM funds will be competitively awarded as a result of yearly calls for proposed flight demonstrators and selected based on possible payoff to NASA, technology maturity, customer interest, cost, and technical risk reduction. This paper will give an overview of the TDM Program s mission and organization, as well as its current status in delivering advanced space technologies that will enable more flexible and robust future missions. It also will provide several examples of missions that fit within these parameters and expected outcomes.
Demand forecasting for automotive sector in Malaysia by system dynamics approach
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zulkepli, Jafri, E-mail: zhjafri@uum.edu.my; Abidin, Norhaslinda Zainal, E-mail: nhaslinda@uum.edu.my; Fong, Chan Hwa, E-mail: hfchan7623@yahoo.com
In general, Proton as an automotive company needs to forecast future demand of the car to assist in decision making related to capacity expansion planning. One of the forecasting approaches that based on judgemental or subjective factors is normally used to forecast the demand. As a result, demand could be overstock that eventually will increase the operation cost; or the company will face understock, which resulted losing their customers. Due to automotive industry is very challenging process because of high level of complexity and uncertainty involved in the system, an accurate tool to forecast the future of automotive demand frommore » the modelling perspective is required. Hence, the main objective of this paper is to forecast the demand of automotive Proton car industry in Malaysia using system dynamics approach. Two types of intervention namely optimistic and pessimistic experiments scenarios have been tested to determine the capacity expansion that can prevent the company from overstocking. Finding from this study highlighted that the management needs to expand their production for optimistic scenario, whilst pessimistic give results that would otherwise. Finally, this study could help Proton Edar Sdn. Bhd (PESB) to manage the long-term capacity planning in order to meet the future demand of the Proton cars.« less
Mittal, Pooja; Dandekar, Aparna; Hessler, Danielle
2014-01-01
Chronic diseases such as hypertension, diabetes, and obesity pose unique reproductive challenges for women. Preconception health results in improved reproductive outcomes. We designed an interventional study testing the use of a reproductive life plan to improve knowledge of preconception and contraception health in women with chronic diseases. Primarily underserved, English-and Spanish-speaking women aged 18 to 40 years with active diabetes, hypertension, or obesity were recruited. We developed a revised reproductive life plan specific to these diseases. Two resident physicians performed reproductive plan counseling. Pre- and postcounseling surveys were administered to evaluate knowledge and attitudes about chronic disease and the effects on a potential pregnancy. Twenty-seven women (average age = 31 years) were surveyed. Of the subjects, 85.2% were obese, 29.6% had hypertension, and 7.4% had diabetes. Significant increases were reported in understanding risks of pregnancy associated with diabetes (p < 0.001), hypertension (p < 0.001), and obesity (p < 0.01). After counseling, women increased their knowledge about a reproductive plan (p < 0.001) and increased support and information to make reproductive health choices (p = 0.001 and p < 0.01, respectively). The largest improvements in postcounseling variables occurred in women with the lowest precounseling test scores and in women without children. A reproductive life plan is a brief, cost-effective preconception and contraception counseling tool in the primary care setting for women with chronic diseases. This tool increases knowledge about reproductive health and enables women with chronic diseases to make informed decisions about their reproductive future.
NASA Flight Planning Branch Space Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Clevenger, Jennifer D.; Bristol, Douglas J.; Whitney, Gregory R.; Blanton, Mark R.; Reynolds, F. Fisher, III
2011-01-01
Planning products and procedures that allowed the mission Flight Control Teams and the Astronaut crews to plan, train and fly every Space Shuttle mission were developed by the Flight Planning Branch at the NASA Johnson Space Center in Houston, Texas. As the Space Shuttle Program came to a close, lessons learned were collected from each phase of the successful execution of these Space Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines have been analyzed and will be discussed. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the Space Shuttle and ground team has also defined specific lessons used in improving the control team s effectiveness. Methodologies to communicate and transmit messages, images, and files from the Mission Control Center to the Orbiter evolved over several years. These lessons were vital in shaping the effectiveness of safe and successful mission planning and have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of Space Shuttle flight missions are not only documented in this paper, but are also discussed regarding how they pertain to changes in process and consideration for future space flight planning.
Flight Planning Branch Space Shuttle Lessons Learned
NASA Technical Reports Server (NTRS)
Price, Jennifer B.; Scott, Tracy A.; Hyde, Crystal M.
2011-01-01
Planning products and procedures that allow the mission flight control teams and the astronaut crews to plan, train and fly every Space Shuttle mission have been developed by the Flight Planning Branch at the NASA Johnson Space Center. As the Space Shuttle Program ends, lessons learned have been collected from each phase of the successful execution of these Shuttle missions. Specific examples of how roles and responsibilities of console positions that develop the crew and vehicle attitude timelines will be discussed, as well as techniques and methods used to solve complex spacecraft and instrument orientation problems. Additionally, the relationships and procedural hurdles experienced through international collaboration have molded operations. These facets will be explored and related to current and future operations with the International Space Station and future vehicles. Along with these important aspects, the evolution of technology and continual improvement of data transfer tools between the shuttle and ground team has also defined specific lessons used in the improving the control teams effectiveness. Methodologies to communicate and transmit messages, images, and files from Mission Control to the Orbiter evolved over several years. These lessons have been vital in shaping the effectiveness of safe and successful mission planning that have been applied to current mission planning work in addition to being incorporated into future space flight planning. The critical lessons from all aspects of previous plan, train, and fly phases of shuttle flight missions are not only documented in this paper, but are also discussed as how they pertain to changes in process and consideration for future space flight planning.
NASA Astrophysics Data System (ADS)
Blumenthal, D.; Trijonis, J.
1984-09-01
A decrease in visibility in the R2508 airspace (in the western Mojave Desert in southern California) since the mid-1940s, when flight test and training facilities were established in this region, is adversely affecting flight and test operations. The Joint Policy and Planning Board (JPPB) of the Department of Defense has initiated studies and discussions of the visibility issue with the goal of developing a management strategy to maintain and optimize the operational capabilities of the test facilities. To identify trends in and sources of visibility degradation in the desert, JPPB initiated two programs: (1) a compilation and review of the historical visibility and air quality data in the California desert region, to be coordinated by the California Desert Air Working Group (CDAWG) and funded by CDAWG participants; and (2) RESearch on Operations-Limiting Visual Extinction (RESOLVE), which involves measuring the visibility at key receptor sites (monitoring stations) in the R2508 region. The report describes the current status of and future plans for the RESOLVE program.
Bench Scale Saltcake Dissolution Test Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
BECHTOLD, D.B.; PACQUET, E.A.
A potential scenario for retrieving saltcake from single shell tanks is the ''Rainbird{reg_sign} sprinkler'' method. Water is distributed evenly across the surface of the saltcake and allowed to percolate by gravity through the waste. The salt dissolves in the water, forming a saturated solution. The saturated liquid is removed by a saltwell pump situated near the bottom of the tank. By this method, there is never a large inventory of liquid in the tank that could pose a threat of leakage. There are many variables or factors that can influence the hydrodynamics of this retrieval process. They include saltcake porosity;more » saltwell pumping rate; salt dissolution chemistry; factors that could promote flow channeling (e.g. tank walls, dry wells, inclusions or discontinuities in the saltcake); method of water distribution; plug formation due to crystal formations or accumulation of insoluble solids. A brief literature search indicates that very little experimental data exist on these aspects of saltcake dissolution (Wiersma 1996, 1997). The tests reported here were planned (Herting, 2000) to provide preliminary data and information for planning future, scaled-up tests of the sprinkler method.« less
A strategic endeavor in business planning--an oncology perspective.
Eck, C
2000-06-01
Planning is imperative to provide direction for future growth. The purpose of writing a business plan is to cultivate, analyze, and refine ideas. Planning for academic health centers has become increasingly important because of the changes in financing and delivery of health care. Gathering data related to the current patients population as well as the projected future trends is necessary to establish a framework. Identifying the market and financial data and formulating the strategies needed to move forward are key elements of a business plan. The ultimate outcome of the process is to convince others that the vision is achievable and to ensure allocation of resources to carry out the plan.
Leadership succession planning: an evidence-based approach for managing the future.
Redman, Richard W
2006-06-01
Leadership succession planning is a key business strategy to help organizational leaders deal effectively with the future. Evidence from industry provides a variety of best practices that can ensure that a pipeline of leaders will be available when they are needed. The author addresses the essential needs that individuals face when developing a cadre of available leaders prepared for managing an uncertain future.
Secondary Waste Simulant Development for Cast Stone Formulation Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, Renee L.; Westsik, Joseph H.; Rinehart, Donald E.
Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integratedmore » Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.« less
NASA Technical Reports Server (NTRS)
Sauerwein, Timothy A.; Gostomski, Thomas
2007-01-01
The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006
Highways of the future : a strategic plan for highway infrastructure research and development
DOT National Transportation Integrated Search
2008-07-01
This Highways of the FutureA Strategic Plan for Highway Infrastructure Research and Development was developed in response to a need expressed by the staff of the Federal Highway Administration (FHWA) Office of Infrastructure Research and Developme...
NASA Astrophysics Data System (ADS)
Frey, H.; Haeberli, W.; Linsbauer, A.; Huggel, C.; Paul, F.
2010-02-01
In the course of glacier retreat, new glacier lakes can develop. As such lakes can be a source of natural hazards, strategies for predicting future glacier lake formation are important for an early planning of safety measures. In this article, a multi-level strategy for the identification of overdeepened parts of the glacier beds and, hence, sites with potential future lake formation, is presented. At the first two of the four levels of this strategy, glacier bed overdeepenings are estimated qualitatively and over large regions based on a digital elevation model (DEM) and digital glacier outlines. On level 3, more detailed and laborious models are applied for modeling the glacier bed topography over smaller regions; and on level 4, special situations must be investigated in-situ with detailed measurements such as geophysical soundings. The approaches of the strategy are validated using historical data from Trift Glacier, where a lake formed over the past decade. Scenarios of future glacier lakes are shown for the two test regions Aletsch and Bernina in the Swiss Alps. In the Bernina region, potential future lake outbursts are modeled, using a GIS-based hydrological flow routing model. As shown by a corresponding test, the ASTER GDEM and the SRTM DEM are both suitable to be used within the proposed strategy. Application of this strategy in other mountain regions of the world is therefore possible as well.
Adaptive false memory: Imagining future scenarios increases false memories in the DRM paradigm.
Dewhurst, Stephen A; Anderson, Rachel J; Grace, Lydia; van Esch, Lotte
2016-10-01
Previous research has shown that rating words for their relevance to a future scenario enhances memory for those words. The current study investigated the effect of future thinking on false memory using the Deese/Roediger-McDermott (DRM) procedure. In Experiment 1, participants rated words from 6 DRM lists for relevance to a past or future event (with or without planning) or in terms of pleasantness. In a surprise recall test, levels of correct recall did not vary between the rating tasks, but the future rating conditions led to significantly higher levels of false recall than the past and pleasantness conditions did. Experiment 2 found that future rating led to higher levels of false recognition than did past and pleasantness ratings but did not affect correct recognition. The effect in false recognition was, however, eliminated when DRM items were presented in random order. Participants in Experiment 3 were presented with both DRM lists and lists of unrelated words. Future rating increased levels of false recognition for DRM lures but did not affect correct recognition for DRM or unrelated lists. The findings are discussed in terms of the view that false memories can be associated with adaptive memory functions.
Application of Molecular Adsorber Coatings in Chamber A for the James Webb Space Telescope
NASA Technical Reports Server (NTRS)
Abraham, Nithin S.
2017-01-01
As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination. As a coating made of highly porous zeolite materials, the Molecular Adsorber Coating (MAC) was developed to capture outgassed molecular contaminants, such as hydrocarbons and silicones. For spaceflight applications, the adsorptive capabilities of the coating can alleviate on-orbit outgassing concerns on or near sensitive surfaces and instruments within the spacecraft. Similarly, this sprayable paint technology has proven to be significantly beneficial for ground-based space applications, in particular, for vacuum chamber environments. This presentation describes the application of the MAC technology for the James Webb Space Telescope (JWST) at NASA Johnson Space Center (JSC). The coating was used as a mitigation tool to entrap outgassed contaminants, specifically silicone-based diffusion pump oil, from within JSCs cryogenic optical vacuum chamber test facility called Chamber A. This presentation summarizes the background, fabrication, installation, chemical analysis test results, and future plans for the MAC technology, which was effectively used to protect the JWST test equipment from vacuum chamber contamination.
ERIC Educational Resources Information Center
Fruge, Don L.; And Others
The paper offers guidelines for estate planning, defined as the art of arranging one's affairs to best care for loved ones while, at the same time, minimizing transfer costs. An understanding of the basics of estate planning is essential if one is to provide for the future of a severely handicapped child. Definitions are given for federal estate…
ERIC Educational Resources Information Center
Arling, Priscilla A.; Kirby, Jill; Saajasto, Kegan
2015-01-01
For college graduates entering the workforce, contributing to an employer-sponsored 401(k) retirement plan can be an important way of saving for the future. However, contribution rates for young people in these plans are far below recommended percentages, leading to concerns about future financial stability for these individuals. Prior work has…
Supersonic Retropropulsion Flight Test Concepts
NASA Technical Reports Server (NTRS)
Post, Ethan A.; Dupzyk, Ian C.; Korzun, Ashley M.; Dyakonov, Artem A.; Tanimoto, Rebekah L.; Edquist, Karl T.
2011-01-01
NASA's Exploration Technology Development and Demonstration Program has proposed plans for a series of three sub-scale flight tests at Earth for supersonic retropropulsion, a candidate decelerator technology for future, high-mass Mars missions. The first flight test in this series is intended to be a proof-of-concept test, demonstrating successful initiation and operation of supersonic retropropulsion at conditions that replicate the relevant physics of the aerodynamic-propulsive interactions expected in flight. Five sub-scale flight test article concepts, each designed for launch on sounding rockets, have been developed in consideration of this proof-of-concept flight test. Commercial, off-the-shelf components are utilized as much as possible in each concept. The design merits of the concepts are compared along with their predicted performance for a baseline trajectory. The results of a packaging study and performance-based trade studies indicate that a sounding rocket is a viable launch platform for this proof-of-concept test of supersonic retropropulsion.
High Alpha Technology Program (HATP) ground test to flight comparisons
NASA Technical Reports Server (NTRS)
Hall, R. M.; Banks, D. W.; Fisher, David F.; Ghaffari, F.; Murri, D. G.; Ross, J. C.; Lanser, Wendy R.
1994-01-01
This status paper reviews the experimental ground test program of the High Alpha Technology Program (HATP). The reasons for conducting this ground test program had their origins during the 1970's when several difficulties were experienced during the development programs of both the F-18 and F-16. A careful assessment of ground test to flight correlations appeared to be important for reestablishing a high degree of confidence in our ground test methodology. The current paper will then focus on one aspect of the HATP program that is intended to improve the correlation between ground test and flight, high-alpha gritting. The importance of this work arises from the sensitivity of configurations with smooth-sided forebodies to Reynolds number. After giving examples of the effects of Reynolds number, the paper will highlight efforts at forebody gritting. Finally, the paper will conclude by summarizing the charter of the HATP Experimental Aerodynamics Working Group and future experimental testing plans.
NEEMO 21: Tools, Techniques, Technologies & Training for Science Exploration EVA
NASA Technical Reports Server (NTRS)
Graff, Trevor
2016-01-01
The 21st mission of the NASA Extreme Environment Mission Operations (NEEMO) was a highly integrated operational test and evaluation of tools, techniques, technologies, and training for science driven exploration during Extravehicular Activity (EVA).The 16-day mission was conducted from the Aquarius habitat, an underwater laboratory, off the coast of Key Largo, FL. The unique facility, authentic science objectives, and diverse skill-sets of the crew/team facilitate the planning and design for future space exploration.
PROGRESS REPORT ON THE DSSTOX DATABASE NETWORK: NEWLY LAUNCHED WEBSITE, APPLICATIONS, FUTURE PLANS
Progress Report on the DSSTox Database Network: Newly Launched Website, Applications, Future Plans
Progress will be reported on development of the Distributed Structure-Searchable Toxicity (DSSTox) Database Network and the newly launched public website that coordinates and...
Structural evaluation of a DTHR bundle divertor particle collector
DOE Office of Scientific and Technical Information (OSTI.GOV)
Prevenslik, T.V.
1980-09-01
The purpose of this report is to present a structural evaluation of the current bundle divertor particle collector BDPC design under a peak heat flux in relation to criteria that protect against coolant leakage into the plasma over replacement schedules planned during DTHR operation. In addition, an assessment of the BDPC structural integrity at higher heat fluxes is presented. Further, recommendations for modifications in the current BDPC design that would improve design reliability to be considered in future design studies are described. Finally, experimental test programs directed to establishing materials data necessary in providing greater confidence in subsequent structural evaluationsmore » of BDPC designs in relation to coolant leakage over planned replacement schedules are identified.« less
Solar Cell and Array Technology Development for NASA Solar Electric Propulsion Missions
NASA Technical Reports Server (NTRS)
Piszczor, Michael; McNatt, Jeremiah; Mercer, Carolyn; Kerslake, Tom; Pappa, Richard
2012-01-01
NASA is currently developing advanced solar cell and solar array technologies to support future exploration activities. These advanced photovoltaic technology development efforts are needed to enable very large (multi-hundred kilowatt) power systems that must be compatible with solar electric propulsion (SEP) missions. The technology being developed must address a wide variety of requirements and cover the necessary advances in solar cell, blanket integration, and large solar array structures that are needed for this class of missions. Th is paper will summarize NASA's plans for high power SEP missions, initi al mission studies and power system requirements, plans for advanced photovoltaic technology development, and the status of specific cell and array technology development and testing that have already been conducted.
Software engineering for ESO's VLT project
NASA Astrophysics Data System (ADS)
Filippi, G.
1994-12-01
This paper reports on the experience at the European Southern Observatory on the application of software engineering techniques to a 200 man-year control software project for the Very Large Telescope (VLT). This shall provide astronomers, before the end of the century, with one of the most powerful telescopes in the world. From the definition of the general model, described in the software management plan, specific activities have been and will be defined: standards for documents and for code development, design approach using a CASE tool, the process of reviewing both documentation and code, quality assurance, test strategy, etc. The initial choices, the current implementation and the future planned activities are presented and, where feedback is already available, pros and cons are discussed.
OMEGA navigation system status and future plans
NASA Technical Reports Server (NTRS)
Nolan, T. P.; Scull, D. C.
1974-01-01
OMEGA is described as a very low frequency (VLF) radio navigational system operating in the internationally allocated navigation band in the electromagentic spectrum between 10 and 14 kilohertz. Full system implementation with worldwide coverage from eight transmitting stations is planned for the latter 1970's. Experimental stations have operated since 1966 in support of system evaluation and test. These stations provided coverage over most of the North Atlantic, North American Continent, and eastern portions of the North Pacific. This coverage provided the fundamental basis for further development of the system and has been essential to the demonstrated feasibility of the one to two nautical mile root-mean-square system accuracy. OMEGA is available to users in all nations, both on ships and in aircraft.
Future Food Production System Development Pulling From Space Biology Crop Growth Testing in Veggie
NASA Technical Reports Server (NTRS)
Massa, Gioia; Romeyn, Matt; Fritsche, Ralph
2017-01-01
Preliminary crop testing using Veggie indicates the environmental conditions provided by the ISS are generally suitable for food crop production. When plant samples were returned to Earth for analysis, their levels of nutrients were comparable to Earth-grown ground controls. Veggie-grown produce food safety microbiology analysis indicated that space-grown crops are safe to consume. Produce sanitizing wipes were used on-orbit to further reduce risk of foodborne illness. Validation growth tests indicated abiotic challenges of insufficient or excess fluid delivery, potentially reduced air flow leading to excess water, elevated CO2 leading to physiological responses, and microorganisms that became opportunistic pathogens. As NASA works to develop future space food production, several areas of research to define these systems pull from the Veggie technology validation tests. Research into effective, reusable water delivery and water recovery methods for future food production systems arises from abiotic challenges observed. Additionally, impacts of elevated CO2 and refinement of fertilizer and light recipes for crops needs to be assessed. Biotic pulls include methods or technologies to effectively sanitize produce with few consumables and low inputs; work to understand the phytomicrobiome and potentially use it to protect crops or enhance growth; selection of crops with high harvest index and desirable flavors for supplemental nutrition; crops that provide psychosocial benefits, and custom space crop development. Planning for future food production in a deep space gateway or a deep space transit vehicle requires methods of handling and storing seeds, and ensuring space seeds are free of contaminants and long-lived. Space food production systems may require mechanization and autonomous operation, with preliminary testing initiated to identify operations and capabilities that are candidates for automation. Food production design is also pulling from Veggie logistics lessons, as we learn about growing at different scales and move toward developing systems that require less launch mass. Veggie will be used as a test bed for novel food production technologies. Veggie is a relatively simple precursor food production system but the knowledge gained from space biology validation tests in Veggie will have far reaching repercussions on future exploration food production. This work is supported by NASA.
Future Food Production System Development Pulling from Space Biology Crop Growth Testing in Veggie
NASA Technical Reports Server (NTRS)
Massa, G. D.; Romeyn, M. W.; Fritsche, R. F.
2017-01-01
Preliminary crop testing using Veggie indicates the environmental conditions provided by the ISS are generally suitable for food crop production. When plant samples were returned to Earth for analysis, their levels of nutrients were comparable to Earth-grown ground controls. Veggie-grown produce food safety microbiology analysis indicated that space-grown crops are safe to consume. Produce sanitizing wipes were used on-orbit to further reduce risk of foodborne illness. Validation growth tests indicated abiotic challenges of insufficient or excess fluid delivery, potentially reduced air flow leading to excess water, elevated CO2 leading to physiological responses, and microorganisms that became opportunistic pathogens. As NASA works to develop future space food production, several areas of research to define these systems pull from the Veggie technology validation tests. Research into effective, reusable water delivery and water recovery methods for future food production systems arises from abiotic challenges observed. Additionally, impacts of elevated CO2 and refinement of fertilizer and light recipes for crops needs to be assessed. Biotic pulls include methods or technologies to effectively sanitize produce with few consumables and low inputs; work to understand the phytomicrobiome and potentially use it to protect crops or enhance growth; selection of crops with high harvest index and desirable flavors for supplemental nutrition; crops that provide psychosocial benefits, and custom space crop development. Planning for future food production in a deep space gateway or a deep space transit vehicle requires methods of handling and storing seeds, and ensuring space seeds are free of contaminants and long-lived. Space food production systems may require mechanization and autonomous operation, with preliminary testing initiated to identify operations and capabilities that are candidates for automation. Food production design is also pulling from Veggie logistics lessons, as we learn about growing at different scales and move toward developing systems that require less launch mass. Veggie will be used as a test bed for novel food production technologies. Veggie is a relatively simple precursor food production system but the knowledge gained from space biology validation tests in Veggie will have far reaching repercussions on future exploration food production.
Component Database for the APS Upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Veseli, S.; Arnold, N. D.; Jarosz, D. P.
The Advanced Photon Source Upgrade (APS-U) project will replace the existing APS storage ring with a multi-bend achromat (MBA) lattice to provide extreme transverse coherence and extreme brightness x-rays to its users. As the time to replace the existing storage ring accelerator is of critical concern, an aggressive one-year removal/installation/testing period is being planned. To aid in the management of the thousands of components to be installed in such a short time, the Component Database (CDB) application is being developed with the purpose to identify, document, track, locate, and organize components in a central database. Three major domains are beingmore » addressed: Component definitions (which together make up an exhaustive "Component Catalog"), Designs (groupings of components to create subsystems), and Component Instances (“Inventory”). Relationships between the major domains offer additional "system knowledge" to be captured that will be leveraged with future tools and applications. It is imperative to provide sub-system engineers with a functional application early in the machine design cycle. Topics discussed in this paper include the initial design and deployment of CDB, as well as future development plans.« less
Cooling Technology for Large Space Telescopes
NASA Technical Reports Server (NTRS)
DiPirro, Michael; Cleveland, Paul; Durand, Dale; Klavins, Andy; Muheim, Daniella; Paine, Christopher; Petach, Mike; Tenerelli, Domenick; Tolomeo, Jason; Walyus, Keith
2007-01-01
NASA's New Millennium Program funded an effort to develop a system cooling technology, which is applicable to all future infrared, sub-millimeter and millimeter cryogenic space telescopes. In particular, this technology is necessary for the proposed large space telescope Single Aperture Far-Infrared Telescope (SAFIR) mission. This technology will also enhance the performance and lower the risk and cost for other cryogenic missions. The new paradigm for cooling to low temperatures will involve passive cooling using lightweight deployable membranes that serve both as sunshields and V-groove radiators, in combination with active cooling using mechanical coolers operating down to 4 K. The Cooling Technology for Large Space Telescopes (LST) mission planned to develop and demonstrate a multi-layered sunshield, which is actively cooled by a multi-stage mechanical cryocooler, and further the models and analyses critical to scaling to future missions. The outer four layers of the sunshield cool passively by radiation, while the innermost layer is actively cooled to enable the sunshield to decrease the incident solar irradiance by a factor of more than one million. The cryocooler cools the inner layer of the sunshield to 20 K, and provides cooling to 6 K at a telescope mounting plate. The technology readiness level (TRL) of 7 will be achieved by the active cooling technology following the technology validation flight in Low Earth Orbit. In accordance with the New Millennium charter, tests and modeling are tightly integrated to advance the technology and the flight design for "ST-class" missions. Commercial off-the-shelf engineering analysis products are used to develop validated modeling capabilities to allow the techniques and results from LST to apply to a wide variety of future missions. The LST mission plans to "rewrite the book" on cryo-thermal testing and modeling techniques, and validate modeling techniques to scale to future space telescopes such as SAFIR.
Planning Future Clinical Trials for Machado-Joseph Disease.
Saute, Jonas Alex Morales; Jardim, Laura Bannach
2018-01-01
Spinocerebellar ataxia type 3/Machado-Joseph disease (SCA3/MJD) is an autosomal dominant multiple neurological systems degenerative disorder caused by a CAG repeat expansion at ATXN3 gene. Only a few treatments were evaluated in randomized clinical trials (RCT) in SCA3/MJD patients, with a lack of evidence for both disease-modifying and symptomatic therapies. The present chapter discuss in detail major methodological issues for planning future RCT for SCA3/MJD. There are several potential therapies for SCA3/MJD with encouraging preclinical results. Route of treatment, dosage titration and potential therapy biomarkers might differ among candidate drugs; however, the core study design and protocol will be mostly the same. RCT against placebo group is the best study design to test a disease-modifying therapy; the same cannot be stated for some symptomatic treatments. Main outcomes for future RCT are clinical scales: the Scale for the Assessment and Rating of ataxia (SARA) is currently the instrument of choice to prove efficacy of disease-modifying or symptomatic treatments against ataxia, the most important disease feature. Ataxia quantitative scales or its composite scores can be used as primary outcomes to provide preliminary evidence of efficacy in phase 2 RCT, due to a greater sensitivity to change. Details regarding eligibility criteria, randomization, sample size estimation, duration and type of analysis for both disease modifying and symptomatic treatment trials, were also discussed. Finally, a section anticipates the methodological issues for testing novel drugs when an effective treatment is already available. We conclude emphasizing four points, the first being the need of RCT for a number of different aims in the care of SCA3/MJD. Due to large sample sizes needed to warrant power, RCT for disease-modifying therapies should be multicenter enterprises. There is an urge need for surrogate markers validated for several drug classes. Finally, engagement of at risk or presymptomatic individuals in future trials will enable major advances on treatment research for SCA3/MJD.
Using a Bayesian network to predict barrier island geomorphologic characteristics
Gutierrez, Ben; Plant, Nathaniel G.; Thieler, E. Robert; Turecek, Aaron
2015-01-01
Quantifying geomorphic variability of coastal environments is important for understanding and describing the vulnerability of coastal topography, infrastructure, and ecosystems to future storms and sea level rise. Here we use a Bayesian network (BN) to test the importance of multiple interactions between barrier island geomorphic variables. This approach models complex interactions and handles uncertainty, which is intrinsic to future sea level rise, storminess, or anthropogenic processes (e.g., beach nourishment and other forms of coastal management). The BN was developed and tested at Assateague Island, Maryland/Virginia, USA, a barrier island with sufficient geomorphic and temporal variability to evaluate our approach. We tested the ability to predict dune height, beach width, and beach height variables using inputs that included longer-term, larger-scale, or external variables (historical shoreline change rates, distances to inlets, barrier width, mean barrier elevation, and anthropogenic modification). Data sets from three different years spanning nearly a decade sampled substantial temporal variability and serve as a proxy for analysis of future conditions. We show that distinct geomorphic conditions are associated with different long-term shoreline change rates and that the most skillful predictions of dune height, beach width, and beach height depend on including multiple input variables simultaneously. The predictive relationships are robust to variations in the amount of input data and to variations in model complexity. The resulting model can be used to evaluate scenarios related to coastal management plans and/or future scenarios where shoreline change rates may differ from those observed historically.