Sample records for fy07-08 implementation plan

  1. Five-Year Plan (FY04-FY-08) for the Manufacturing Technology (ManTech) Program. Supplement to the FY03 - FY07 Plan

    DTIC Science & Technology

    2003-07-01

    magnetorheological (MRF) finishing to reduce surface roughness in half the time of previous processes . Improved image quality directly supports improved...affordably polish the inside surface of small tight free form optics to a finish on the order of 3 angstroms. • Demonstrate cycle time reduction...processes and controls for steel, titanium, and superalloys. FY2007: • Demonstrate an improved superfine finishing for optical components to

  2. Suicide Among Patients in the Veterans Affairs Health System: Rural–Urban Differences in Rates, Risks, and Methods

    PubMed Central

    Blow, Frederic C.; Ignacio, Rosalinda V.; Ilgen, Mark A.; Austin, Karen L.; Valenstein, Marcia

    2012-01-01

    Objectives. Using national patient cohorts, we assessed rural–urban differences in suicide rates, risks, and methods in veterans. Methods. We identified all Department of Veterans Affairs (VA) patients in fiscal years 2003 to 2004 (FY03–04) alive at the start of FY04 (n = 5 447 257) and all patients in FY06–07 alive at the start of FY07 (n = 5 709 077). Mortality (FY04–05 and FY07–08) was assessed from National Death Index searches. Census criteria defined rurality. We used proportional hazards regressions to calculate rural–urban differences in risks, controlling for age, gender, psychiatric diagnoses, VA mental health services accessibility, and regional administrative network. Suicide method was categorized as firearms, poisoning, strangulation, or other. Results. Rural patients had higher suicide rates (38.8 vs 31.4/100 000 person-years in FY04–05; 39.6 vs 32.4/100 000 in FY07–08). Rural residence was associated with greater suicide risks (20% greater, FY04–05; 22% greater, FY07–08). Firearm deaths were more common in rural suicides (76.8% vs 61.5% in FY07–08). Conclusions. Rural residence is a suicide risk factor, even after controlling for mental health accessibility. Public health and health system suicide prevention should address risks in rural areas. PMID:22390583

  3. Integrated Medical Information Technology System (IMITS): Information and Clinical Technologies for the Advancement of Healthcare

    DTIC Science & Technology

    2010-08-31

    Teleaudiology o FY08: Remote access of cochlear implants Teleaudiology DIACAP / FDA certification o FY08: Teleaudiology DIACAP and FDA certification to conduct...remote access, monitor, and adjust cochlear implants  ECMO o FY05: Extra Corporeal Membrane Oxygenation (ECMO) o FY07 Pacific Rim ECMO/VAD...These dashboards were developed for use by appointed AFMS radiologists to monitor the flow and statistics of teleradiology. The dashboards are web

  4. BRAC, What Will it Cost

    DTIC Science & Technology

    1992-04-10

    Devens - Fort Huachuca FY 91 FY 95 Fort McClellan FY 92 FY 96 Fort Chaffee FY 92 FY 97 Cameron Station FY 91 FY 95 53 Stand Alone Housing Sites FY 90 FY...Army, Headquarters Forces Command, &as Realianment and Closure Implementation Plan - Fort Devens Closure Package, Implementation Plan, Fort McPherson, GA...Classification) RAC , What Will It Cost? 12. PERSONAL AUTHOR(S) TLIN, Robert B. LTC, USA 13. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year

  5. Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration. Division of Fish and Wildlife.

    1988-11-01

    The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less

  6. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  7. International Infantry and Joint Services Small Arms Systems Section Symposium, Exhibition and Firing Demonstration. Held in Atlantic City, NJ on 13-16 May 2002. Volume 3

    DTIC Science & Technology

    2002-05-13

    Mount • Install Large Capacity Ammo Container On Mount • Add Actuators And Resolvers For Laying OCSW Independent Of Main Gun t ti f t ti...FY07 FY08 FY09 FY10 FY11 FY12 4 5 6 SI Prod Block II (2K FLIR,Dual Feed, CPU Upgrade, AP Enhancements, MEMS) IOT &E LFT&E LUT...PQT Fielding (T) SDD C&TD Production LRIP SDD Prototypes Prototype Build BDENET MS B FRP MS C LRIP FCS S D D P ro to ty p es IOTE SD LRIP OCSW

  8. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  9. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1993.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1992-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Annual Implementation World Plan (AIWP) presents BPA`s plans for implementing the Program during fiscal year (FY) 1993. The FY 1993 AIWP emphasizes continuation of 143 ongoing or projecting ongoing Programmore » projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1993 AIWP also contains three new Program projects or tasks that are planned to start in FY 1993.« less

  10. Overview of Doing Business with SPAWAR Systems Command (SPAWAR)

    DTIC Science & Technology

    2011-08-22

    School Girls Day Out FY07 – 1 school FY08 – 34 schools FY09 – 35 schools FY10 – 47 schools Material World Modules International Autonomous Underwater...s it e , a n d a ls o f rom t h e foll o vn n g link: e-CC Self -Service News The 23rd P.nnual Na v y Gold Coast Small Business O pportunity Conf...Opportunities 1. Requirements Office: Joint Program Manager - Information Systems (JPMIS) 2. Joint Effects Model (JEM) Increment 1 Sustainment 3

  11. Cloud computing strategic framework (FY13 - FY15).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arellano, Lawrence R.; Arroyo, Steven C.; Giese, Gerald J.

    This document presents an architectural framework (plan) and roadmap for the implementation of a robust Cloud Computing capability at Sandia National Laboratories. It is intended to be a living document and serve as the basis for detailed implementation plans, project proposals and strategic investment requests.

  12. Using Organizational Philosophy to Create a Self-Sustaining Compensation Plan Without Harming Academic Missions.

    PubMed

    Leverence, Robert; Nuttall, Richard; Palmer, Rachel; Segal, Mark; Wood, Alicia; Yancey, Fay; Shuster, Jonathon; Brantly, Mark; Hromas, Robert

    2017-08-01

    Academic physician reimbursement has moved to productivity-based compensation plans. To be sustainable, such plans must be self-funding. Additionally, unless research and education are appropriately valued, faculty involved in these efforts will become disillusioned, yet revenue generation in these activities is less robust than for clinical care activities. Faculty at the Department of Medicine, University of Florida Health, elected a committee of junior and senior faculty and division chiefs to restructure the compensation plan in fiscal year (FY) 2011. This committee was charged with designing a new compensation plan based on seven principles of organizational philosophy: equity, compensation coupled to productivity, authority aligned with responsibility, respect for all academic missions, transparency, professionalism, and self-funding in each academic mission. The new compensation plan was implemented in FY2013. A survey administered at the end of FY2015 showed that 61% (76/125) of faculty were more satisfied with this plan than the previous plan. Since the year before implementation, clinical relative value units per faculty increased 7% (from 3,458 in FY2012 to 3,704 in FY2015, P < .002), incentives paid per faculty increased 250% (from $3,191 in FY2012 to $11,153 in FY2015, P ≤ .001), and publications per faculty increased 15% (from 2.6 in FY2012 to 3.0 in FY2015, P < .001). Grant submissions, external funding, and teaching hours also increased per faculty but did not reach statistical significance. An important next step will be to incorporate quality metrics into the compensation plan, without affecting costs or throughput.

  13. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  14. Computer Science Research Funding: How Much Is Too Little?

    DTIC Science & Technology

    2009-06-01

    Bioinformatics Parallel computing Computational biology Principles of programming Computational neuroscience Real-time and embedded systems Scientific...National Security Agency ( NSA ) • Missile Defense Agency (MDA) and others The various research programs have been coordinated through the DDR&E...DOD funding included only DARPA and OSD programs. FY07 and FY08 PBR funding included DARPA, NSA , some of the Services’ basic and applied research

  15. Simulators Sustainment Management: Advance Planning Briefing to Industry

    DTIC Science & Technology

    2007-05-15

    ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13...Training Systems  Business  Opportunities  FY07­08  T­1A Ground Based Training System CLS Re­compete  C­130 Landing Gear Trainer  MC­130W Weapon...value $150M • Full and open competition  • One  year  basic with nine option  years   Name:  Capt. Greg Purnell  Organization:  507 ACSS/GFLA  Phone

  16. Strategic Goals Implementation Plan V3.0

    DTIC Science & Technology

    2009-01-01

    Management/Core Business Mission (WSLM/CBM). (Nov 07) Demonstrate real-time data access from 12 Major Defense Acquisition Programs. (Feb 08) Initiate...72 Outcome/ Success Initiatives/OPR 3 - 6 mos. 12 mos. 18 mos. 24 mos. Metrics 6.1.3 Manage AT&L Defense Agencies like the businesses they...Feb and Aug each year through (2011) ✓ Conduct mid- year review of BRAC Business Plans. (Mar 08 and annually) 7.1.2 Sustain Global Defense Posture

  17. Highlands County transit development plan : (FY 2003/04-2007/08)

    DOT National Transportation Integrated Search

    2002-07-01

    To plan for a public transportation system, it is necessary to gain an understanding of the environment within which the system is operating. The following aspects are examined in this report: Demographics; public involvement; existing transportation...

  18. 75 FR 39493 - United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... plan includes the USPTO's mission statement, vision statement and a description of the strategic goals... achieve its vision. Full details on how the USPTO plans to implement the strategic plan, including funding...] United States Patent and Trademark Office Draft Strategic Plan for FY 2010-2015 AGENCY: United States...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbiamore » River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia Rivermore » and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  1. RESULTS OF TRITIUM TRACKING AND GROUNDWATER MONITORING AT THE HANFORD SITE 200 AREA STATE APPROVED LAND DISPOSAL SITE FY2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ERB DB

    2008-11-19

    The Hanford Site's 200 Area Effluent Treatment Facility (ETF) processes contaminated aqueous wastes derived from Hanford Site facilities. The treated wastewater occasionally contains tritium, which cannot be removed by the ETF prior to the wastewater being discharged to the 200 Area State-Approved Land Disposal Site (SALDS). During the first 11 months of fiscal year 2008 (FY08) (September 1, 2007, to July 31, 2008), approximately 75.15 million L (19.85 million gal) of water were discharged to the SALDS. Groundwater monitoring for tritium and other constituents, as well as water-level measurements, is required for the SALDS by State Waste Discharge Permit Numbermore » ST-4500 (Ecology 2000). The current monitoring network consists of three proximal (compliance) monitoring wells and nine tritium-tracking wells. Quarterly sampling of the proximal wells occurred in October 2007 and in January/February 2008, April 2008, and August 2008. The nine tritium-tracking wells, including groundwater monitoring wells located upgradient and downgradient of the SALDS, were sampled in January through April 2008. Water-level measurements taken in the three proximal SALDS wells indicate that a small groundwater mound is present beneath the facility, which is a result of operational discharges. The mound increased in FY08 due to increased ETF discharges from treating groundwater from extraction wells at the 200-UP-l Operable Unit and the 241-T Tank Farm. Maximum tritium activities increased by an order of magnitude at well 699-48-77A (to 820,000 pCi/L in April 2008) but remained unchanged in the other two proximal wells. The increase was due to higher quantities of tritium in wastewaters that were treated and discharged in FY07 beginning to appear at the proximal wells. The FY08 tritium activities for the other two proximal wells were 68,000 pCi/L at well 699-48-77C (October 2007) and 120,000 pCi/L at well 699-48-77D (October 2007). To date, no indications of a tritium incursion from the SALDS have been detected in the tritium-tracking wells. Concentrations of all chemical constituents were within Permit limits or were below method detection limits when sampled during FY08. A summary of the chemical constituent concentrations or method detection limits is provided in Table 3-2 in the main text discussion. This report presents the results of groundwater monitoring and tritium-tracking samples from the SALDS facility during FY08. Due to the 30-day laboratory turnaround for analysis of proximal well groundwater samples, this report addresses available date extending from August 1, 2007, through September 30, 2008 (August 2007 data were not included in the FY07 report). Updated background information, which is necessary to understand the results of the groundwater analyses, is also provided on facility operations. Interpretive discussions and recommendations for future monitoring are also provided, where possible.« less

  2. Notification: Evaluation of Laboratory Equipment Utilization

    EPA Pesticide Factsheets

    Project #OPE-FY14-0024, April 08, 2014. The Office of Inspector General plans to begin preliminary research on equipment utilization within the U.S. Environmental Protection Agency Office of Research and Development.

  3. Notification: Background Investigation Services Project Notification US Virgin Islands Environmental Program Evaluation

    EPA Pesticide Factsheets

    Projects #OPE-FY14-0004, OPE-FY14-0005 and OPE-FY14-0006, October 30, 2013. The EPA OIG plans to begin preliminary research on October 30, 2013 into the environmental programs the US Virgin Islands (USVI) has implemented on EPA’s behalf.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, GE; Diefenderfer, HL

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  6. High performance computing and communications: FY 1997 implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage, with bipartisan support, of the High-Performance Computing Act of 1991, signed on December 9, 1991. The original Program, in which eight Federal agencies participated, has now grown to twelve agencies. This Plan provides a detailed description of the agencies` FY 1996 HPCC accomplishments and FY 1997 HPCC plans. Section 3 of this Plan provides an overview of the HPCC Program. Section 4 contains more detailed definitions of the Program Component Areas, with an emphasis on the overall directions and milestones planned for each PCA. Appendix A providesmore » a detailed look at HPCC Program activities within each agency.« less

  7. Implementing Policy Options to Strengthen the Nexus between Postsecondary Education and Workforce Development. Commission Report 08-07

    ERIC Educational Resources Information Center

    California Postsecondary Education Commission, 2008

    2008-01-01

    In December 2007, the California Postsecondary Education adopted the last in an initial series of reports on the nexus between postsecondary education and workforce development by requesting staff to return with plans and priorities to pursue implementation of ten general policy options, grouped into three categories. One option is already being…

  8. LBNL Laboratory Directed Research and Development Program FY2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ho, D.

    2017-03-01

    The Berkeley Lab Laboratory Directed Research and Development Program FY2016 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation and review.

  9. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1991-01-01

    NASA's principal metrication accomplishments for FY 1990 were establishment of metrication policy for major programs, development of an implementing instruction for overall metric policy and initiation of metrication planning for the major program offices. In FY 1991, development of an overall NASA plan and individual program office plans will be completed, requirement assessments will be performed for all support areas, and detailed assessment and transition planning will be undertaken at the institutional level. Metric feasibility decisions on a number of major programs are expected over the next 18 months.

  10. Satellite Power System (SPS) FY 79 program summary

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.

  11. Acquisition Workforce: Department of Defense’s Plans to Address Workforce Size and Structure Challenges

    DTIC Science & Technology

    2002-04-01

    FY03 In implementation Grouped into follow-on strategy “ Marketing , Recruiting, & Retention” The military services are already using these programs and...career field or portion of the workforce and expand into other areas of the workforce. FY03 In implementation Grouped into follow-on strategy “ Marketing , Recruiting...facilitate more long-term relationships. Not provided In implementation Grouped into follow-on strategy “ Marketing , Recruiting, & Retention” 12. Establish

  12. Implementation plan for underground waste storage tank surveillance and stabilization improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dukelow, G.T.; Maupin, V.D.; Mihalik, L.A.

    1989-04-01

    Several studies have addressed the need to upgrade the methods currently used for surveillance of underground waste storage tanks, particularly single-shell tanks (SST), which are susceptible to leaks and intrusions. Fifty tasks were proposed to enhance the existing surveillance program; however, prudent budget management dictates that only the tasks with the highest potential for success be selected and funded. This plan identifies fourteen inexpensive improvements that may be implemented in less than two years. Recent developments stress the need to complete interim stabilization of these tanks more quickly than now budgeted and to identify methods to salvage or eliminate themore » interstitial liquid left behind after saltwell jet-pumping. The plan calls for the use of available resources to remove saltwell liquid from SSTs as rapidly as possible rather than committing to new surveillance technologies that might not lead to near-term improvements. This plan describes the selection criteria and provides cost estimates and schedules for implementing the recommendations of the task forces. The proposed improvements result in completion of jet-pumping in FY 1994, two years ahead of the current FY 1996 milestone. While the accelerated plan requires more funding in the early years, the total cost will be the same as completing the work in FY 1996.« less

  13. Review of Web-Based Technical Documentation Processes. FY07 NAEP-QA Special Study Report. TR-08-17

    ERIC Educational Resources Information Center

    Gribben, Monica; Wise, Lauress; Becker, D. E.

    2008-01-01

    Beginning with the 2000 and 2001 National Assessment of Educational Progress (NAEP) assessments, the National Center for Education Statistics (NCES) has made technical documentation available on the worldwide web at http://nces.ed.gov/nationsreportcard/tdw/. The web-based documentation is designed to be less dense and more accessible than prior…

  14. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program.

    PubMed

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-05-03

    Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. The total funds allocated in Tanzania's districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania's National Nutrition Strategy Implementation Plan. VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. © 2016 by Kerman University of Medical Sciences

  15. Planning and Budgeting for Nutrition Programs in Tanzania: Lessons Learned From the National Vitamin A Supplementation Program

    PubMed Central

    Lyatuu, Margaret Benjamin; Mkumbwa, Temina; Stevenson, Raz; Isidro, Marissa; Modaha, Francis; Katcher, Heather; Dhillon, Christina Nyhus

    2016-01-01

    Background: Micronutrient deficiency in Tanzania is a significant public health problem, with vitamin A deficiency (VAD) affecting 34% of children aged 6 to 59 months. Since 2007, development partners have worked closely to advocate for the inclusion of twice-yearly vitamin A supplementation and deworming (VASD) activities with budgets at the subnational level, where funding and implementation occur. As part of the advocacy work, a VASD planning and budgeting tool (PBT) was developed and is used by district officials to justify allocation of funds. Helen Keller International (HKI) and the Tanzania Food and Nutrition Centre (TFNC) conduct reviews of VASD funds and health budgets annually in all districts to monitor the impact of advocacy efforts. This paper presents the findings of the fiscal year (FY) 2010 district budget annual review. The review was intended to answer the following questions regarding district-level funding: (1) how many funds were allocated to nutrition-specific activities in FY 2010? (2) how many funds were allocated specifically to twice-yearly VASD activities in FY 2010? and (3) how have VASD funding allocations changed over time? Methods: Budgets from all 133 districts in Tanzania were accessed, reviewed and documented to identify line item funds allocated for VASD and other nutrition activities in FY 2010. Retrospective data from prior annual reviews for VASD were used to track trends in funding. The data were collected using specific data forms and then transcribed into an excel spreadsheet for analysis. Results: The total funds allocated in Tanzania’s districts in FY 2010 amounted to US$1.4 million of which 92% were for VASD. Allocations for VASD increased from US$0.387 million to US$1.3 million between FY 2005 and FY 2010. Twelve different nutrition activities were identified in budgets across the 133 districts. Despite the increased trend, the percentage of districts allocating sufficient funds to implement VAS (as defined by cost per child) was just 21%. Discussion: District-driven VAS funding in Tanzania continues to be allocated by districts consistently, although adequacy of funding is a concern. However, regular administrative data point to fairly high and consistent coverage rates for VAS across the country (over 80% over the last 10 years). Although this analysis may have omitted some nutrition-specific funding not identified in district budget data, it represents a reliable reflection of the nutrition funding landscape in FY 2010. For this year, total district nutrition allocations add up to only 2% of the amount needed to implement nutrition services at scale according to Tanzania’s National Nutrition Strategy Implementation Plan. Conclusion: VASD advocacy and planning support at the district level has succeeded in ensuring district allocations for the program. To promote sustainable implementation of other nutrition interventions in Tanzania, more funds must be allocated and guidance must be accompanied by tools that enable planning and budgeting at the district level. PMID:27694649

  16. Advanced rural transportation systems (ARTS) : rural intelligent transportation systems (ITS) : program plan

    DOT National Transportation Integrated Search

    1996-08-01

    This Program Plan for the Advanced Rural Transportation Systems (ARTS) implements the goals and objectives established in the U.S. Department of Transportations (USDOTs) Strategic Plan for the ARTS. This Program Plan proposes five years (FY 97...

  17. MODEL DEVELOPMENT FOR FY08 CMAQ RELEASE

    EPA Science Inventory

    This task provides credible state of the art air quality models and guidance for use in implementation of National Ambient Air Quality Standards for ozone and PM. This research effort is to develop and improve air quality models, such as the Community Multiscale Air Quality (CMA...

  18. Ecosystem restoration: Chapter 4

    USGS Publications Warehouse

    Cullinane Thomas, Catherine M.; Skrabis, K. E.; Gascoigne, William

    2012-01-01

    The Department of the Interior extensively supports―through its mission, policy, programs, and funding― the study, planning, implementation, and monitoring of ecosystem restoration. This commitment is reflected in the Department's FY2011-2016 Strategic Plan.

  19. Superfund Program Review

    EPA Pesticide Factsheets

    This document presents outcomes of implementing a number of the actions described in the November 2013 Superfund Remedial Program Review (SPR) Action Plan . It also describes ongoing Action Plan efforts and projects future outcomes anticipated in FY 2015

  20. EPA Brownfields Area-Wide Planning Recipients Selected for FY13 Grant Funding

    EPA Pesticide Factsheets

    EPA has selected the following entities as Brownfields Area-Wide Planning grant recipients. These recipients will work with their local community members, other stakeholders and project partners to develop an area-wide plan and implementation strategy for

  1. EVALUATION TECHNIQUES AND TOOL DEVELOPMENT FOR FY 08 CMAQ RELEASE

    EPA Science Inventory

    In this task, research efforts are outlined that relate to the AMD Model Evaluation Program element and support CMAQ releases within the FY05-FY08 time period. Model evaluation serves dual purposes; evaluation is necessary to characterize the accuracy of model predictions, and e...

  2. Spacecraft Internal Acoustic Environment Modeling

    NASA Technical Reports Server (NTRS)

    Chu, Shao-Sheng R.; Allen Christopher S.

    2010-01-01

    Acoustic modeling can be used to identify key noise sources, determine/analyze sub-allocated requirements, keep track of the accumulation of minor noise sources, and to predict vehicle noise levels at various stages in vehicle development, first with estimates of noise sources, later with experimental data. This paper describes the implementation of acoustic modeling for design purposes by incrementally increasing model fidelity and validating the accuracy of the model while predicting the noise of sources under various conditions. During FY 07, a simple-geometry Statistical Energy Analysis (SEA) model was developed and validated using a physical mockup and acoustic measurements. A process for modeling the effects of absorptive wall treatments and the resulting reverberation environment were developed. During FY 08, a model with more complex and representative geometry of the Orion Crew Module (CM) interior was built, and noise predictions based on input noise sources were made. A corresponding physical mockup was also built. Measurements were made inside this mockup, and comparisons were made with the model and showed excellent agreement. During FY 09, the fidelity of the mockup and corresponding model were increased incrementally by including a simple ventilation system. The airborne noise contribution of the fans was measured using a sound intensity technique, since the sound power levels were not known beforehand. This is opposed to earlier studies where Reference Sound Sources (RSS) with known sound power level were used. Comparisons of the modeling result with the measurements in the mockup showed excellent results. During FY 10, the fidelity of the mockup and the model were further increased by including an ECLSS (Environmental Control and Life Support System) wall, associated closeout panels, and the gap between ECLSS wall and mockup wall. The effect of sealing the gap and adding sound absorptive treatment to ECLSS wall were also modeled and validated.

  3. FRX-L Research Status and Plans

    NASA Astrophysics Data System (ADS)

    Wurden, G. A.; Intrator, T. P.; Taccetti, J. M.; Furno, I. G.; Hsu, S. C.; Zhang, S. Y.; Degnan, J. H.; Grabowski, C.; Ruden, E. L.

    2003-10-01

    Our research plans for FRX-L, the field reversed configuration plasma injector at LANL for magnetized target fusion (MTF), have been planned for the next 4-year period. FRX-L has been successfully operating now for the last two years, although construction for both the machine and diagnostic sets is ongoing. Efforts in FY04 begin with continued improvements in the basic high density FRC parameters, through operation at increased magnetic fields and with the addition of a more effective main bank crowbar to reduce parasitic ringing in the high current main coil circuit. Translation experiments into a "fake" metal liner, perforated with diagnostic access ports, will start after designing and constructing the translation section. Another bank of capacitors will be added to power the additional guide and mirror coils. After demonstrating trapping of the plasma in the aluminum liner, and diagnosing sufficient plasma parameters (density, temperature, lifetime, purity), we will begin preparations for the integrated plasma/liner compression experiment at the Air Force Research Laboratory Shiva-Star machine in FY05. Construction of the new hardware will continue during FY06, and the first fusion-relevant demonstration of compression of plasma by an imploding metal liner is planned for FY07. Our MTF plans also include new initiatives with U of Washington, U of Wisconsin, and the University of New Mexico, in addition to ongoing theory ties to LLNL and GA.

  4. Metrication report to the Congress

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The principal NASA metrication activities for FY 1989 were a revision of NASA metric policy and evaluation of the impact of using the metric system of measurement for the design and construction of the Space Station Freedom. Additional studies provided a basis for focusing follow-on activity. In FY 1990, emphasis will shift to implementation of metric policy and development of a long-range metrication plan. The report which follows addresses Policy Development, Planning and Program Evaluation, and Supporting Activities for the past and coming year.

  5. Effect of Lean Processes on Surgical Wait Times and Efficiency in a Tertiary Care Veterans Affairs Medical Center.

    PubMed

    Valsangkar, Nakul P; Eppstein, Andrew C; Lawson, Rick A; Taylor, Amber N

    2017-01-01

    There are an increasing number of veterans in the United States, and the current delay and wait times prevent Veterans Affairs institutions from fully meeting the needs of current and former service members. Concrete strategies to improve throughput at these facilities have been sparse. To identify whether lean processes can be used to improve wait times for surgical procedures in Veterans Affairs hospitals. Databases in the Veterans Integrated Service Network 11 Data Warehouse, Veterans Health Administration Support Service Center, and Veterans Information Systems and Technology Architecture/Dynamic Host Configuration Protocol were queried to assess changes in wait times for elective general surgical procedures and clinical volume before, during, and after implementation of lean processes over 3 fiscal years (FYs) at a tertiary care Veterans Affairs medical center. All patients evaluated by the general surgery department through outpatient clinics, clinical video teleconferencing, and e-consultations from October 2011 through September 2014 were included. Patients evaluated through the emergency department or as inpatient consults were excluded. The surgery service and systems redesign service held a value stream analysis in FY 2013, culminating in multiple rapid process improvement workshops. Multidisciplinary teams identified systemic inefficiencies and strategies to improve interdepartmental and patient communication to reduce canceled consultations and cases, diagnostic rework, and no-shows. High-priority triage with enhanced operating room flexibility was instituted to reduce scheduling wait times. General surgery department pilot projects were then implemented mid-FY 2013. Planned outcome measures included wait time, clinic and telehealth volume, number of no-shows, and operative volume. Paired t tests were used to identify differences in outcome measures after the institution of reforms. Following rapid process improvement workshop project rollouts, mean (SD) patient wait times for elective general surgical procedures decreased from 33.4 (8.3) days in FY 2012 to 26.0 (9.5) days in FY 2013 (P = .02). In FY 2014, mean (SD) wait times were half the value of the previous FY at 12.0 (2.1) days (P = .07). This was a 3-fold decrease from wait times in FY 2012 (P = .02). Operative volume increased from 931 patients in FY 2012 to 1090 in FY 2013 and 1072 in FY 2014. Combined clinic, telehealth, and e-consultation encounters increased from 3131 in FY 2012 to 3460 in FY 2013 and 3517 in FY 2014, while the number of no-shows decreased from 366 in FY 2012 to 227 in FY 2014 (P = .02). Improvement in the overall surgical patient experience can stem from multidisciplinary collaboration among systems redesign personnel, clinicians, and surgical staff to reduce systemic inefficiencies. Monitoring and follow-up of system efficiency measures and the employment of lean practices and process improvements can have positive short- and long-term effects on wait times, clinical throughput, and patient care and satisfaction.

  6. An Analysis of the Return on Investment of Navy Enterprise Resource Planning as Implemented Navy-Wide FY04-FY15

    DTIC Science & Technology

    2011-06-01

    companies led the way for companies to move to ERP in order to address potential Y2K issues. As it became clear that the date turnover from December...customer responsiveness, integration, standardization, cost reduction, flexibility, globalization, Y2K , business performance, and supply/demand chain

  7. Secure & Restore Critical Fisheries Habitat, Flathead Subbasin, FY2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DuCharme, Lynn; Tohtz, Joel

    The construction of Hungry Horse Dam inundated 125 km of adfluvial trout habitat in the South Fork of the Flathead River and its tributaries, impacting natural fish reproduction and rearing. Rapid residential and commercial growth in the Flathead Watershed now threaten the best remaining habitats and restrict our opportunities to offset natural resource losses. Hydropower development and other land disturbances caused severe declines in the range and abundance of our focal resident fish species, bull trout and westslope cutthroat trout. Bull trout were listed as threatened in 1998 under the Endangered Species Act and westslope cutthroat were petitioned for listingmore » under ESA. Westslope cutthroat are a species of special concern in Montana and a species of special consideration by the Confederated Salish and Kootenai Tribes. The Secure & Protect Fisheries Habitat project follows the logical progression towards habitat restoration outlined in the Hungry Horse Dam Fisheries Mitigation Implementation Plan approved by the NWPPC in 1993. This project is also consistent with the 2000 Fish and Wildlife Program and the Flathead River Subbasin Plan that identifies the protection of habitats for these populations as one of the most critical needs in the subbasin and directs actions to offset habitat losses. The Flathead basin is one of the fastest growing human population centers in Montana. Riparian habitats are being rapidly developed and subdivided, causing habitat degradation and altering ecosystem functions. Remaining critical habitats in the Flathead Watershed need to be purchased or protected with conservation easements if westslope cutthroat and bull trout are to persist and expand within the subbasin. In addition, habitats degraded by past land uses need to be restored to maximize the value of remaining habitats and offset losses caused by the construction of Hungry Horse Dam. Securing and restoring remaining riparian habitat will benefit fish by shading and moderating water temperatures, stabilizing banks and protecting the integrity of channel dimension, improving woody debris recruitment for in-channel habitat features, producing terrestrial insects and leaf litter for recruitment to the stream, and helping to accommodate and attenuate flood flows. The purpose of this project is to work with willing landowners to protect the best remaining habitats in the Flathead subbasin as identified in the Flathead River Subbasin Plan. The target areas for land protection activities follow the priorities established in the Flathead subbasin plan and include: (1) Class 1 waters as identified in the Flathead River Subbasin Plan; (2) Class 2 watersheds as identified in the Flathead River Subbasin Plan; and (3) 'Offsite mitigation' defined as those Class 1 and Class 2 watersheds that lack connectivity to the mainstem Flathead River or Flathead Lake. This program focuses on conserving the highest quality or most important riparian or fisheries habitat areas consistent with program criteria. The success of our efforts is subject to a property's actual availability and individual landowner negotiations. The program is guided using biological and project-based criteria that reflect not only the priority needs established in the Flathead subbasin plan, but also such factors as cost, credits, threats, and partners. The implementation of this project requires both an expense and a capital budget to allow work to be completed. This report addresses accomplishments under both budgets during FY08 as the two budgets are interrelated. The expense budget provided pre-acquisition funding to conduct activities such as surveys, appraisals, staff support, etc. The capital budget was used to purchase the interest in each parcel including closing costs. Both the pre-acquisition contract funds and the capital funds used to purchase fee title or conservation easements were spent in accordance with the terms negotiated within the FY08 through FY09 MOA between the Tribes, State, and BPA. In FY08, the focus of this project was to pursue all possible properties targeted by the Tribes and Montana Fish, Wildlife and Parks. Although we were not be able to acquire an interest in all properties targeted this fiscal year due to limited time, BPA staff constraints, and negotiation constraints, we expended approximately $4.2M providing BPA with 4.2 km of credit. The Siderius and Gardner parcels were protected with conservation easements. The Siderius conservation easement is held by the Flathead Land Trust and the Gardner conservation easement is held by the Tribes. Fee title was acquired for three parcels with the Tribes holding title to the Cole and Firestone parcels and MFWP holding title to the parcels acquired from Plum Creek Timber Company. All stream kilometers credited to BPA offset construction and inundation impacts (not operations related impacts) associated with Hungry Horse Dam as defined in the 1991 Hungry Horse Loss Assessment.« less

  8. Notification: Review of EPA’s Implementation of Benzene Fuel Content Standards

    EPA Pesticide Factsheets

    Project #OPE-FY15-0051, September 11, 2015. The Office of Inspector General (OIG) for the U.S. Environmental Protection Agency (EPA) plans to begin preliminary research on the EPA’s implementation of benzene fuel content standards.

  9. Notification: EPA's Implementation and Enforcement of the Lead-Based Paint Renovation, Repair and Painting Rule

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0162, March 28, 2018. The OIG plans to begin preliminary research to evaluate the EPA's implementation and enforcement of the Lead-Based Paint Renovation, Repair and Painting Rule (RRP).

  10. Notification: Implementation of Executive Order 13771, “Reducing Regulation and Controlling Regulatory Costs”

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0177, April 10, 2018. The OIG plans to begin preliminary research on the Office of the Administrator's Office of Policy implementation of Executive Order 13771, Reducing Regulation and Controlling Regulatory Costs.

  11. 77 FR 62150 - Approval and Promulgation of Implementation Plans; Kentucky; Approval of Revisions to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-12

    ... Existing Indirect Heat Exchangers. 6.08 Standard of 10/23/01 66 FR 53660 06/13/79 Performance for Existing.../21/82 Performance for New Indirect Heat Exchangers. 7.07 Standard of 10/23/01 66 FR 53661 09/15/93... 10/23/01 66 FR 53662 03/17/93 Performance for New Insulation of Magnet Wire. 7.56 Standard of 10/23...

  12. Research and Development Program Plan for the Center for Engineering Systems Advanced Research (CESAR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weisbin, C.R.; Barhen, J.; Hamel, W.R.

    1987-01-01

    A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.

  13. CTUIR Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project 2008 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2008 Fiscal Year (FY) reporting period (February 1, 2008-January 31, 2009) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight primary fisheries habitat enhancement projects were implemented on Meachammore » Creek, Birch Creek, West Birch Creek, McKay Creek, West Fork Spring Hollow, and the Umatilla River. Specific restoration actions included: (1) rectifying one fish passage barrier on West Birch Creek; (2) participating in six projects planting 10,000 trees and seeding 3225 pounds of native grasses; (3) donating 1000 ft of fencing and 1208 fence posts and associated hardware for 3.6 miles of livestock exclusion fencing projects in riparian areas of West Birch and Meacham Creek, and for tree screens to protect against beaver damage on West Fork Spring Hollow Creek; (4) using biological control (insects) to reduce noxious weeds on three treatment areas covering five acres on Meacham Creek; (5) planning activities for a levee setback project on Meacham Creek. We participated in additional secondary projects as opportunities arose. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at additional easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success. An Aquatic Habitat Inventory was conducted from river mile 0-8 on Isquulktpe Creek and the data collected was compared with data collected in 1994. Monitoring plans will continue throughout the duration of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance in accordance with the Umatilla River Subbasin Salmon and Steelhead Production Plan (NPPC 1990) and the Final Umatilla Willow Subbasin Plan (Umatilla/Willow Subbasin Planning Team 2005).« less

  14. Notification: Evaluation of EPA’s Management Controls to Implement and Enforce Pesticide Worker Protection Standards

    EPA Pesticide Factsheets

    Project #OPE-FY17-0008, Feb 9, 2017.The EPA OIG plans to begin research to evaluate EPA’s management controls implementing the revised Worker Protection Standards (WPS) requirements to reduce pesticide exposure and risks to agricultural workers.

  15. Child Care and Development Fund: Report of State Plans FY 2002-2003.

    ERIC Educational Resources Information Center

    Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.

    The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…

  16. Notification: Audit of the U.S. Environmental Protection Agency's Implementation of Do Not Pay Requirements

    EPA Pesticide Factsheets

    Project #OA-FY13-0391, August 26, 2013. The EPA's OIG plans to begin preliminary research for an audit ofthe agency's implementation ofthe Do Not Pay requirements outlined in the Improper Payments Elimination and Recovery Improvement Act of 2012.

  17. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  18. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-09-21

    some observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the...An October 2015 Congressional Budget Office (CBO) report on the Navy’s FY2015 30-year shipbuilding plan estimates that the plan would require 11.5...shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and its 30-year (FY2017-FY2046) shipbuilding plan include the following:  the

  19. SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stone, Timothy A.; Blair, Michael W.; Weis, Eric

    2014-03-03

    The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less

  20. Notification: Impact of EPA’s Lack of Notice of Availability of Required Training Materials on Agricultural Worker Protection Standard Implementation

    EPA Pesticide Factsheets

    Project #OA&E-FY18-0190, May 2, 2018. The OIG plans to begin preliminary research to evaluate the impact of EPA’s lack of notice of availability of required training materials on Agricultural Worker Protection Standard implementation.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trudel, Marc; Tucker, Strahan; Morris, John

    Historically, salmon stocks from the Columbia River and Snake River formed one of the most valuable fisheries on the west coast of North America. However, salmon and steelhead returns sharply declined during the 1980s and 1990s to reach nearly 1 million fish. Although several factors may be responsible for the decline of Columbia River salmon and steelhead, there is increasing evidence that these drastic declines were primarily attributable to persistently unfavorable ocean conditions. Hence, an understanding of the effects of ocean conditions on salmon production is required to forecast the return of salmon to the Columbia River basin and tomore » assess the efficacy of mitigation measures such as flow regulation on salmon resources in this system. The Canadian Program on High Seas Salmon has been collecting juvenile salmon and oceanographic data off the west coast of British Columbia and Southeast Alaska since 1998 to assess the effects of ocean conditions on the distribution, migration, growth, and survival of Pacific salmon. Here, we present a summary of the work conducted as part of the Canada-USA Salmon Shelf Survival Study during the 2008 fiscal year and compare these results with those obtained from previous years. The working hypothesis of this research is that fast growth enhances the marine survival of salmon, either because fast growing fish quickly reach a size that is sufficient to successfully avoid predators, or because they accumulate enough energy reserves to better survive their first winter at sea, a period generally considered critical in the life cycle of salmon. Sea surface temperature decreased from FY05 to FY08, whereas, the summer biomass of phytoplankton increased steadily off the west coast of Vancouver Island from FY05 to FY08. As in FY07, zooplankton biomass was generally above average off the west coast of Vancouver Island in FY08. Interestingly, phytoplankton and zooplankton biomass were higher in FY08 than was expected from the observed nutrient concentration that year. This suggests nutrients were more effectively by phytoplankton in FY08. In addition, the abundance of lipid-rich northern copepods increased from FY05 to FY08, whereas lipid-poor southern copepods showed the opposite pattern, suggesting that growth conditions were more favorable to juvenile salmon in FY08 than in previous years. However, growth indices for juvenile coho salmon were near the 1998-2008 average, both off the west coast of Vancouver Island and Southeast Alaska, indicating that additional factors beside prey quality affect juvenile salmon growth in the marine environment. Catches of juvenile Chinook, sockeye and chum salmon off the west coast of Vancouver Island in June-July 2008 were the highest on record during summer since 1998, suggesting that early marine survival for the 2008 smolt year was high. Interestingly, the proportion of hatchery fish was high (80-100%) among the juvenile Columbia River Chinook salmon caught off the British Columbia coast during summer, suggest that relatively few wild Chinook salmon are produced in the Columbia River Chinook. In addition, we also recovered two coded-wire tagged juvenile Redfish Lake sockeye salmon in June 2008 off the west coast of British Columbia. As relatively few Redfish Lake sockeye smolts are tagged each year, this also suggests that early marine survival was high for these fish, and may result in a high return in 2009 if they mature at age three, or in 2010 if they mature at age four. To date, our research shows that different populations of Columbia River salmon move to different locations along the coastal zone where they establish their ocean feeding grounds and overwinter. We further show that ocean conditions experienced by juvenile Columbia River salmon vary among regions of the coast, with higher plankton productivity and temperatures off the west coast of Vancouver Island than in Southeast Alaska. Hence, different stocks of juvenile salmon originating from the Columbia River and Snake River are exposed to different ocean conditions and may respond differently to climate changes. In particular, our work shows that the growth and fat content of Chinook and coho salmon vary along different parts of the coast and among years. These growth differences appear to be associated with differences in prey quality rather than by a direct effect of temperature on salmon growth or prey quantity, indicating that changes in ocean conditions and circulation affect salmon production indirectly through changes in prey community composition and quality. Taken together, our analyses indicate that the relative survival of different stocks of salmon in the ocean will depend on where they migrate in the ocean, and that changes at the base of the food chain must be taken into consideration to understand the effects of ocean conditions on salmon growth, and hence, on salmon survival.« less

  2. 78 FR 11685 - Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Analysis, FY 2012 Service Contract Inventory, and FY 2012 Service Contract Inventory Planned Analysis for... of the availability of the FY 2011 Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service Contract Inventory Planned Analysis. The FY 2011 inventory analysis...

  3. Exploratory Research and Development Fund, FY 1990

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicinemore » and radiation biophysics.« less

  4. 75 FR 53324 - Notice of Availability: Notice of Funding Availability (NOFA) for HUD's Fiscal Year (FY) 2010...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-25] Notice of Availability... either a Choice Neighborhood Planning Grant or a Choice Neighborhood Implementation Grant application. Upon conclusion of its review of Planning Grant applications submitted in response to the Round 1 NOFA...

  5. 2014 Fermilab Laboratory Directoed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. Wester

    After initiation by the Fermilab Laboratory Director, a team from the senior Laboratory leadership and a Laboratory Directed Research and Development (LDRD) Advisory Committee developed an implementation plan for LDRD at Fermilab for the first time. This implementation was captured in the approved Fermilab 2014 LDRD Program Plan and followed directions and guidance from the Department of Energy (DOE) order, DOE O 413.2B, a “Roles, Responsibilities, and Guidelines, …” document, and examples of best practices at other DOE Office of Science Laboratories. At Fermilab, a FY14 midyear Call for Proposals was issued. A LDRD Selection Committee evaluated those proposals thatmore » were received and provided a recommendation to the Laboratory Director who approved seven LDRD projects. This Annual Report focuses on the status of those seven projects and provides an overview of the current status of LDRD at Fermilab. The seven FY14 LDRD approved projects had a date of initiation late in FY14 such that this report reflects approximately six months of effort approximately through January 2015. The progress of these seven projects, the subsequent award of six additional new projects beginning in FY15, and preparations for the issuance of the FY16 Call for Proposals indicates that LDRD is now integrated into the overall annual program at Fermilab. All indications are that LDRD is improving the scientific and technical vitality of the Laboratory and providing new, novel, or cutting edge projects carried out at the forefront of science and technology and aligned with the mission and strategic visions of Fermilab and the Department of Energy.« less

  6. FY17 Strategic Themes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    2017-03-01

    I am pleased to present this summary of the FY17 Division 1000 Science and Technology Strategic Plan. As this plan represents a continuation of the work we started last year, the four strategic themes (Mission Engagement, Bold Outcomes, Collaborative Environment, and Safety Imperative) remain the same, along with many of the goals. You will see most of the changes in the actions listed for each goal: We completed some actions, modified others, and added a few new ones. As I’ve stated previously, this is not a strategy to be pursued in tension with the Laboratory strategic plan. The Division 1000more » strategic plan is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming months.« less

  7. Multidisciplinary Analysis and Optimization Generation 1 and Next Steps

    NASA Technical Reports Server (NTRS)

    Naiman, Cynthia Gutierrez

    2008-01-01

    The Multidisciplinary Analysis & Optimization Working Group (MDAO WG) of the Systems Analysis Design & Optimization (SAD&O) discipline in the Fundamental Aeronautics Program s Subsonic Fixed Wing (SFW) project completed three major milestones during Fiscal Year (FY)08: "Requirements Definition" Milestone (1/31/08); "GEN 1 Integrated Multi-disciplinary Toolset" (Annual Performance Goal) (6/30/08); and "Define Architecture & Interfaces for Next Generation Open Source MDAO Framework" Milestone (9/30/08). Details of all three milestones are explained including documentation available, potential partner collaborations, and next steps in FY09.

  8. Notification: Assessment of EPA Telework Policies and Tools

    EPA Pesticide Factsheets

    Project #OPE-FY16-0028, August 23, 2016. The EPA OIG plans to begin preliminary research to assess the agency's compliance with and implementation of relevant teleworking policies and guidance issued by the Office of Personnel Management.

  9. FY 2011 Educational Facilities Master Plan & the FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2010

    2010-01-01

    The FY 2011 Educational Facilities Master Plan (Master Plan) and FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  10. FY16 Strategic Themes.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leland, Robert W.

    2017-03-01

    I am pleased to present this summary of the Division 1000 Science and Technology Strategic Plan. This plan was created with considerable participation from all levels of management in Division 1000, and is intended to chart our course as we strive to contribute our very best in service of the greater Laboratory strategy. The plan is characterized by four strategic themes: Mission Engagement, Bold Outcomes, Collaborative Environment, and the Safety Imperative. Each theme is accompanied by a brief vision statement, several goals, and planned actions to support those goals throughout FY16. I want to be clear that this is notmore » a strategy to be pursued in tension with the Laboratory strategic plan. Rather, it is intended to describe “how” we intend to show up for the “what” described in Sandia’s Strategic Plan. I welcome your feedback and look forward to our dialogue about these strategic themes. Please join me as we move forward to implement the plan in the coming year.« less

  11. Trends in prescription drug utilization and spending for the Department of Defense, 2002-2007.

    PubMed

    Devine, Joshua W; Trice, Shana; Spridgen, Stacia L; Bacon, Thomas A

    2009-09-01

    Examine trends in U.S. Department of Defense (DoD) outpatient drug spending and utilization between 2002 and 2007. We analyzed pharmacy claims data from the U.S. Military Health System (MHS), using a cross-sectional analysis at the prescription and patient-year level and measuring utilization in 30-day equivalent prescriptions and expenditures in dollars. Pharmaceutical spending more than doubled in DoD, from $3 billion in FY02 to $6.5 billion in FY07. The largest increase occurred in the DoD community pharmacy network, where utilization grew from 6 million 30-day equivalent prescriptions in the first quarter of FY02 to more than 16 million in the last quarter of FY07. The smallest increase in annual spending occurred in FY07 (5.5%), down from a high of 27.5% in FY03. The MHS has experienced rapid growth in pharmaceutical spending since FY02. However, there are signs that growth in pharmaceutical spending may be slowing.

  12. 36 CFR 330.7 - Funding.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 3 2011-07-01 2011-07-01 false Funding. 330.7 Section 330.7... § 330.7 Funding. (a) Section 330.3(c) sets forth the maximum authorized funds for law enforcement contracting in FY 1978 and FY 1979. The Division funding levels for FY 1978 are based on information as...

  13. 36 CFR 330.7 - Funding.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 3 2012-07-01 2012-07-01 false Funding. 330.7 Section 330.7... § 330.7 Funding. (a) Section 330.3(c) sets forth the maximum authorized funds for law enforcement contracting in FY 1978 and FY 1979. The Division funding levels for FY 1978 are based on information as...

  14. 36 CFR 330.7 - Funding.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 3 2014-07-01 2014-07-01 false Funding. 330.7 Section 330.7... § 330.7 Funding. (a) Section 330.3(c) sets forth the maximum authorized funds for law enforcement contracting in FY 1978 and FY 1979. The Division funding levels for FY 1978 are based on information as...

  15. Exploratory Research and Development Fund, FY 1990. Report on Lawrence Berkeley Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-05-01

    The Lawrence Berkeley Laboratory Exploratory R&D Fund FY 1990 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the projects supported and summarizes their accomplishments. It constitutes a part of an Exploratory R&D Fund (ERF) planning and documentation process that includes an annual planning cycle, projection selection, implementation, and review. The research areas covered in this report are: Accelerator and fusion research; applied science; cell and molecular biology; chemical biodynamics; chemical sciences; earth sciences; engineering; information and computing sciences; materials sciences; nuclear science; physics and research medicine and radiationmore » biophysics.« less

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 104: Area 7 Yucca Flat Atmospheric Test Sites Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patrick Matthews

    2012-10-01

    CAU 104 comprises the following corrective action sites (CASs): • 07-23-03, Atmospheric Test Site T-7C • 07-23-04, Atmospheric Test Site T7-1 • 07-23-05, Atmospheric Test Site • 07-23-06, Atmospheric Test Site T7-5a • 07-23-07, Atmospheric Test Site - Dog (T-S) • 07-23-08, Atmospheric Test Site - Baker (T-S) • 07-23-09, Atmospheric Test Site - Charlie (T-S) • 07-23-10, Atmospheric Test Site - Dixie • 07-23-11, Atmospheric Test Site - Dixie • 07-23-12, Atmospheric Test Site - Charlie (Bus) • 07-23-13, Atmospheric Test Site - Baker (Buster) • 07-23-14, Atmospheric Test Site - Ruth • 07-23-15, Atmospheric Test Site T7-4 •more » 07-23-16, Atmospheric Test Site B7-b • 07-23-17, Atmospheric Test Site - Climax These 15 CASs include releases from 30 atmospheric tests conducted in the approximately 1 square mile of CAU 104. Because releases associated with the CASs included in this CAU overlap and are not separate and distinguishable, these CASs are addressed jointly at the CAU level. The purpose of this CADD/CAP is to evaluate potential corrective action alternatives (CAAs), provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 104. Corrective action investigation (CAI) activities were performed from October 4, 2011, through May 3, 2012, as set forth in the CAU 104 Corrective Action Investigation Plan.« less

  17. FY 2013 Educational Facilities Master Plan and the FY 2013-2018 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2012

    2012-01-01

    The FY 2013 Educational Facilities Master Plan (Master Plan) and the FY 2013-2018 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of…

  18. FY 2012 Educational Facilities Master Plan and the Amended FY 2011-2016 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2011

    2011-01-01

    The FY 2012 Educational Facilities Master Plan (Master Plan) and Amendments to the FY 2011-2016 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the…

  19. FY 2007 Educational Facilities Master Plan and the FY 2007-2012 Capital Improvements Program

    ERIC Educational Resources Information Center

    Montgomery County Public Schools, 2006

    2006-01-01

    The FY 2007 Educational Facilities Master Plan (Master Plan) and FY 2007-2012 Capital Improvements Program (CIP) reflect the adopted actions of the Montgomery County (Maryland) Council and integrate the facilities planning process with the annual capital budget and the six-year CIP. The CIP is developed in accordance with the Board of Education…

  20. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  1. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  2. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  3. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...

  4. Notification: Congressionally Requested Audit of Improper Funding of Advocacy Campaign for Northwest Indian Fisheries Commission Puget Sound Protection and Restoration Implementation Grant No. PA00J32201

    EPA Pesticide Factsheets

    Project #OA-FY16-0178, May 13, 2016. The EPA OIG plans to begin preliminary research on an audit of the Northwest Indian Fisheries Commission (NWIFC) Puget Sound Protection and Restoration Implementation Grant No. PA00J32201.

  5. Notification: Audit of Northwest Indian Fisheries Commission Puget Sound Protection and Restoration Implementation Grant Nos. PA00J32201 and PA00J91201

    EPA Pesticide Factsheets

    Project #OA-FY16-0176, May 13, 2016. The EPA OIG plans to begin preliminary research on an audit of the Northwest Indian Fisheries Commission (NWIFC) Puget Sound Protection and Restoration Implementation Grant Nos. PA00J32201 and PA00J91201.

  6. FY 95 engineering work plan for the design reconstitution implementation action plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bigbee, J.D.

    Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less

  7. 36 CFR § 330.7 - Funding.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Funding. § 330.7 Section Â... § 330.7 Funding. (a) Section 330.3(c) sets forth the maximum authorized funds for law enforcement contracting in FY 1978 and FY 1979. The Division funding levels for FY 1978 are based on information as...

  8. Structural Mechanics Division research and technology plans for FY 1990 and accomplishments for FY 1989

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1990-01-01

    The Objectives, FY 1990 Plans, Approach, and FY 1990 Milestones for the Structural Mechanics Division's research programs are presented. FY 1989 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  9. Structures and Dynamics Division research and technology plans for FY 1986 and accomplishments for FY 1985

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1986-01-01

    Presented are the Objectives, FY 1986 Plans, Approach, and FY 1986 Milestones for the Structures and Dynamics Division's research programs. FY 1985 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  10. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-08-02

    called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned , but the FY2006-FY2011 Future Years...Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007. The FY2006-FY2011 FYDP also calls...developments have caused the Navy to reconsider its plans for procuring amphibious ships and maritime prepositioning ships. One is a new concept of operations

  11. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2014-08-01

    submarines (SSBNs) 12b 12-14b 12b 12b 14 14 14 14 14 Cruise missile submarines (SSGNs) 0c 0-4c 4c 0c 4 4 4 4 2 or 4d Attack submarines ( SSNs ...aircraft carrier 1 1 Virginia ( SSN -774) class attack submarine 2 2 2 2 2 10 Arleigh Burke (DDG-51) class destroyer 2 2 2 2 2 10 Littoral Combat Ship...shows the Navy’s FY2015 30-year (FY2015-FY2044) shipbuilding plan. Table 3. Navy FY2015 30-Year (FY2015-FY2044) Shipbuilding Plan FY CVN LSC SSC SSN

  12. Archive and records management-Fiscal year 2010 offline archive media trade study

    USGS Publications Warehouse

    Bodoh, Tom; Boettcher, Ken; Gacke, Ken; Greenhagen, Cheryl; Engelbrecht, Al

    2010-01-01

    This document is a trade study comparing offline digital archive storage technologies. The document compares and assesses several technologies and recommends which technologies could be deployed as the next generation standard for the U.S. Geological Survey (USGS). Archives must regularly migrate to the next generation of digital archive technology, and the technology selected must maintain data integrity until the next migration. This document is the fiscal year 2010 (FY10) revision of a study completed in FY01 and revised in FY03, FY04, FY06, and FY08.

  13. Structures and Dynamics Division research and technology plans for FY 1988 and accomplishments for FY 1987

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1988-01-01

    Presented are the Objectives, FY 1988 Plans, Approach, and FY 1988 Milestones for the Structures and Dynamics Division (Langley Research Center) research programs. FY 1987 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  14. Structures and Dynamics Division research and technology plans for FY 1987 and accomplishments for FY 1986

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1987-01-01

    This paper presents the Objectives, FY 1987 Plans, Approach, and FY 1987 Milestones for the Structures and Dynamics Division's research programs. FY 1986 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  15. Structures and Dynamics Division research and technology plans for FY 1985 and accomplishments for FY 1984

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1985-01-01

    The objectives, FY 1985 plans, approach, and FY 1985 milestones for the Structures and Dynamics Division's research programs are presented. The FY 1984 accomplishments are presented where applicable. This information is useful in program coordination with other government organizations in areas of mutual interest.

  16. MERCURY RESEARCH STRATEGY.

    EPA Science Inventory

    The USEPA's ORD is pleased to announce the availability of its Mercury Research Strategy. This strategy guides ORD's mercury research program and covers the FY2001-2005 time frame. ORD will use it to prepare a multi-year mercury research implementation plan in 2001. The Mercury R...

  17. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  18. ANL site response for the DOE FY1994 information resources management long-range plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boxberger, L.M.

    1992-03-01

    Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less

  19. 2015 Fermilab Laboratory Directed Research & Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wester, W.

    2016-05-26

    The Fermi National Accelerator Laboratory (FNAL) is conducting a Laboratory Directed Research and Development (LDRD) program. Fiscal year 2015 represents the first full year of LDRD at Fermilab and includes seven projects approved mid-year in FY14 and six projects approved in FY15. One of the seven original projects has been completed just after the beginning of FY15. The implementation of LDRD at Fermilab is captured in the approved Fermilab 2015 LDRD Annual Program Plan. In FY15, the LDRD program represents 0.64% of Laboratory funding. The scope of the LDRD program at Fermilab will be established over the next couple ofmore » years where a portfolio of about 20 on-going projects representing approximately between 1% and 1.5% of the Laboratory funding is anticipated. This Annual Report focuses on the status of the current projects and provides an overview of the current status of LDRD at Fermilab.« less

  20. FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Randy R. LaBarge

    1999-11-05

    This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positivemore » progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.« less

  1. Materials Division research and technology accomplishments for FY 87 and plans for FY 88

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1988-01-01

    The research program of the Materials Division is presented as FY 87 accomplishments and FY 88 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  2. Materials Division research and technology accomplishments for FY 89 and plans for FY 90

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1990-01-01

    The research program of the Materials Division is presented as FY-89 accomplishments and FY-90 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material will be useful in program coordination with other government organizations, universities, and industries in areas of mutual interest.

  3. Materials Division research and technical accomplishments for FY 1988 and plans for FY 1989

    NASA Technical Reports Server (NTRS)

    Brinkley, Kay L.

    1989-01-01

    The research program of the Materials Division is presented as FY-88 accomplishments and FY-89 plans. The accomplishments for each Branch are highlighted and plans are outlined. Publications of the Division are included by Branch. This material is useful in program coordination with other government organizations, universities, and industry in areas of mutual interest.

  4. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Development and implementation...

  5. 40 CFR 52.920 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... New oil-effluent water separators 06/29/79 08/07/81, 46 FR 40188. 401 KAR 59:101 New bulk gasoline.../06/79 01/25/80, 45 FR 6092. 401 KAR 61:045 Existing oil-effluent water separators 06/29/79 08/07/81....11 Control of Open Burning 10/23/01 66 FR 53660 02/22/90 1.14 Control of Fugitive Particulate...

  6. Estimation of genetic parameters for productive life, reproduction, and milk-production traits in US dairy goats.

    PubMed

    Castañeda-Bustos, V J; Montaldo, H H; Torres-Hernández, G; Pérez-Elizalde, S; Valencia-Posadas, M; Hernández-Mendo, O; Shepard, L

    2014-01-01

    Heritabilities and correlations for milk yield (MY), fat yield (FY), protein yield (PY), combined fat and protein yield (FPY), fat percentage (F%), protein percentage (P%), age at first kidding (AFK), interval between the first and second kidding (KI), and real and functional productive life at 72mo (FPL72) of 33,725 US dairy goats, were estimated using animal models. Productive life was defined as the total days in production until 72mo of age (PL72) for goats having the opportunity to express the trait. Functional productive life was obtained by correcting PL72 for MY, FY, PY, and final type score (FS). Six selection indexes were used, including or excluding PL72, with 6 groups of different economic weights, to estimate the responses to selection considering MY, FY, PY, and PL72 as selection criteria. The main criteria that determined the culling of a goat from the herd were low FS, MY, and FY per lactation. Heritability estimates were 0.22, 0.17, 0.37, 0.37, 0.38, 0.39, 0.54, 0.64, 0.09, and 0.16 for PL72, FPL72, MY, FY, PY, FPY, F%, P%, KI, and AFK, respectively. Most genetic correlations between the evaluated traits and PL72 or FPL72 were positive, except for F% (-0.04 and -0.06, respectively), P% (-0.002 and -0.03, respectively), and AFK (-0.03 and -0.01, respectively). The highest genetic correlations were between FPL72 and MY (0.39) and between PL72 and MY (0.33). Most phenotypic correlations between the traits evaluated and FPL72 and PL72 were positive (>0.23 and >0.26, respectively), except for F% (-0.004 and -0.02, respectively), P% (-0.05 and -0.02), KI (-0.01 and -0.07), and AFK (-0.08 and -0.08). The direct selection for PL72 increased it by 102.28d per generation. The use of MY, FY, PY, KI, or AFK as selection criteria increased PL72 by 39.21, 27.33, 35.90, -8.28, or 2.77d per generation, respectively. The inclusion of PL72 as selection criterion increased the expected response per generation from 0.15 to 17.35% in all selection indices studied. Copyright © 2014 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  7. 75 FR 15686 - NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ...-01] NOAA'S Office of Ocean Exploration and Research (OER) Strategic Plan FY 2011-FY 2015 AGENCY: Office of Ocean Exploration and Research (OER), Oceanic and Atmospheric Research (OAR), National Oceanic... comment. [[Page 15687

  8. RESULTS OF THE FY09 ENHANCED DOE HIGH LEVEL WASTE MELTER THROUGHPUT STUDIES AT SRNL

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, F.; Edwards, T.

    2010-06-23

    High-level waste (HLW) throughput (i.e., the amount of waste processed per unit time) is a function of two critical parameters: waste loading (WL) and melt rate. For the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site and the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS), increasing HLW throughput would significantly reduce the overall mission life cycle costs for the Department of Energy (DOE). The objective of this task is to develop data, assess property models, and refine or develop the necessary models to support increased WL of HLW at SRS. It is a continuationmore » of the studies initiated in FY07, but is under the specific guidance of a Task Change Request (TCR)/Work Authorization received from DOE headquarters (Project Number RV071301). Using the data generated in FY07, FY08 and historical data, two test matrices (60 glasses total) were developed at the Savannah River National Laboratory (SRNL) in order to generate data in broader compositional regions. These glasses were fabricated and characterized using chemical composition analysis, X-ray Diffraction (XRD), viscosity, liquidus temperature (TL) measurement and durability as defined by the Product Consistency Test (PCT). The results of this study are summarized below: (1) In general, the current durability model predicts the durabilities of higher waste loading glasses quite well. A few of the glasses exhibited poorer durability than predicted. (2) Some of the glasses exhibited anomalous behavior with respect to durability (normalized leachate for boron (NL [B])). The quenched samples of FY09EM21-02, -07 and -21 contained no nepheline or other wasteform affecting crystals, but have unacceptable NL [B] values (> 10 g/L). The ccc sample of FY09EM21-07 has a NL [B] value that is more than one half the value of the quenched sample. These glasses also have lower concentrations of Al{sub 2}O{sub 3} and SiO{sub 2}. (3) Five of the ccc samples (EM-13, -14, -15, -29 and -30) completely crystallized with both magnetite and nepheline, and still had extremely low NL [B] values. These particular glasses have more CaO present than any of the other glasses in the matrix. It appears that while all of the glasses contain nepheline, the NL [B] values decrease as the CaO concentration increases from 2.3 wt% to 4.3 wt%. A different form of nepheline may be created at higher concentrations of CaO that does not significantly reduce glass durability. (4) The T{sub L} model appears to be under-predicting the measured values of higher waste loading glasses. Trends in T{sub L} with composition are not evident in the data from these studies. (5) A small number of glasses in the FY09 matrix have measured viscosities that are much lower than the viscosity range over which the current model was developed. The decrease in viscosity is due to a higher concentration of non-bridging oxygens (NBO). A high iron concentration is the cause of the increase in NBO. Durability, viscosity and T{sub L} data collected during FY07 and FY09 that specifically targeted higher waste loading glasses was compiled and assessed. It appears that additional data may be required to expand the coverage of the T{sub L} and viscosity models for higher waste loading glasses. In general, the compositional regions of the higher waste loading glasses are very different than those used to develop these models. On the other hand, the current durability model seems to be applicable to the new data. At this time, there is no evidence to modify this model; however additional experimental studies should be conducted to determine the cause of the anomalous durability data.« less

  9. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  10. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  11. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Master Implementation Sequencing... Incorporating New Information Into the Plan § 385.30 Master Implementation Sequencing Plan. (a) Not later than... of Environmental Protection, and other Federal, State, and local agencies, develop a Master...

  12. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Consequences of control strategy implementation plan failures. 93.120 Section 93.120 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any...

  13. Implementation of the Large-Scale Operations Management Test in the State of Washington.

    DTIC Science & Technology

    1982-12-01

    During FY 79, the U.S. Army Engineer Waterways Experiment Station (WES), Vicksburg, Miss., completed the first phase of its 3-year Large-Scale Operations Management Test (LSOMT). The LSOMT was designed to develop an operational plan to identify methodologies that can be implemented by the U.S. Army Engineer District, Seattle (NPS), to prevent the exotic aquatic macrophyte Eurasian watermilfoil (Myrophyllum spicatum L.) from reaching problem-level proportions in water bodies in the state of Washington. The WES developed specific plans as integral elements

  14. 40 CFR 52.2673 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Guam § 52.2673 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  15. 40 CFR 52.2823 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) American Samoa § 52.2823 Original identification of plan. (a) This section identified the original “Implementation Plan for Compliance With the...

  16. Structural dynamics division research and technology accomplishments for FY 1993 and plans for FY 1994

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1994-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for F.Y. 1993 and research plans for F.Y. 1994. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  17. Structural dynamics division research and technology accomplishments for FY 1989 and plans for FY 1990

    NASA Technical Reports Server (NTRS)

    Smith, Jacqueline G.; Gardner, James E.

    1990-01-01

    The purpose is to present the Structural Dynamics Division's research accomplishments for FY 1989 and research plans for FY 1990. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  18. Loads and aeroelasticity division research and technology accomplishments for FY 1985 and plans for FY 1986

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1986-01-01

    The Langley Research Center Loads and Aeroelasticity Division's research accomplishments for FY85 and research plans for FY86 are presented. The rk under each branch (technical area) will be described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  19. Loads and Aeroelasticity Division research and technology accomplishments for FY 1986 and plans for FY 1987

    NASA Technical Reports Server (NTRS)

    Gardner, James E.; Dixon, S. C.

    1987-01-01

    The Loads and Aeroelasticity Division's research accomplishments for FY 86 and research plans for FY 87 are presented. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  20. EDI Planning and Implementation Guide.

    DTIC Science & Technology

    1992-06-01

    mentation Guide is designed to both assist DoD activities in the preparation of EDI business plans and to educate DoD personnel on EDI matters. Strategic...business trans- actions be transmitted using EDI by the fourth quarter of FY96. Structure of the Guide The figure below shows how each chapter and appendix...in the Guide relate to each other and their roles in the development of business plans and the education of DoD personnel. Chapters 1, 5, and the

  1. FY08 LDRD Final Report A New Method for Wave Propagation in Elastic Media LDRD Project Tracking Code: 05-ERD-079

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petersson, A

    The LDRD project 'A New Method for Wave Propagation in Elastic Media' developed several improvements to the traditional finite difference technique for seismic wave propagation, including a summation-by-parts discretization which is provably stable for arbitrary heterogeneous materials, an accurate treatment of non-planar topography, local mesh refinement, and stable outflow boundary conditions. This project also implemented these techniques in a parallel open source computer code called WPP, and participated in several seismic modeling efforts to simulate ground motion due to earthquakes in Northern California. This research has been documented in six individual publications which are summarized in this report. Of thesemore » publications, four are published refereed journal articles, one is an accepted refereed journal article which has not yet been published, and one is a non-refereed software manual. The report concludes with a discussion of future research directions and exit plan.« less

  2. 40 CFR 52.622 - Original identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Original identification of plan. 52.622... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.622 Original identification of plan. (a) This section identified the original “State of Hawaii Air Pollution Control Implementation Plan...

  3. 40 CFR 52.1119 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental Compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Massachusetts § 52.1119...

  4. 40 CFR 52.1519 - Identification of plan-conditional approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revision for a Small Business Technical and Environmental compliance Assistance Program dated... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan-conditional... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1519...

  5. Research and technology plans for FY 1989 and accomplishments for FY 1988. [Structural Mechanics Division

    NASA Technical Reports Server (NTRS)

    Bales, Kay S.

    1989-01-01

    The Objectives, FY 1989 Plans, Approach, and FY 1989 Milestones for the Structural Mechanics Division's research programs are presented. Fiscal year 1988 Accomplishments are presented where applicable. This information is useful in program coordination with other governmental organizations in areas of mutual interest.

  6. Project Plan: Salt in Situ Heater Test.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuhlman, Kristopher L.; Mills, Melissa Marie; Herrick, Courtney G.

    This project plan gives a high-level description of the US Department of Energy Office of Nuclear Energy (DOE-NE) Spent Fuel and Waste Disposition (SFWD) campaign in situ borehole heater test project being planned for the Waste Isolation Pilot Plant (WIPP) site This plan provides an overview of the schedule and responsibilities of the parties involved. This project is a collaborative effort by Sandia, Los Alamos, and Lawrence Berkeley National Laboratories to execute a series of small-diameter borehole heater tests in salt for the DOE-NE SFWD campaign. Design of a heater test in salt at WIPP has evolved over several years.more » The current design was completed in fiscal year 2017 (FY17), an equipment shakedown experiment is underway in April FY18, and the test implementation will begin in summer of FY18. The project comprises a suite of modular tests, which consist of a group of nearby boreholes in the wall of drifts at WIPP. Each test is centered around a packer-isolated heated borehole (5" diameter) containing equipment for water-vapor collection and brine sampling, surrounded by smaller-diameter (2" diameter) satellite observation boreholes. Observation boreholes will contain temperature sensors, tracer release points, electrical resistivity tomography (ERT) sensors, fiber optic sensing, and acoustic emission (AE) measurements, and sonic velocity sources and sensors. These satellite boreholes will also be used for plugging/sealing tests. The first two tests to be implemented will have the packer-isolated borehole heated to 120°C, with one observation borehole used to monitor changes. Follow-on tests will be designed using information gathered from the first two tests, will be conducted at other temperatures, will use multiple observation boreholes, and may include other measurement types and test designs.« less

  7. Structural dynamics division research and technology accomplishments for FY 1992 and plans for FY 1993

    NASA Technical Reports Server (NTRS)

    Wynne, Eleanor C.

    1993-01-01

    The purpose of this paper is to present the Structural Dynamics Division's research accomplishments for F.Y. 1992 and research plans for F.Y. 1993. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5-year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  8. Loads and aeroelasticity division research and technology accomplishments for FY 1987 and plans for FY 1988

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Gardner, James E.

    1988-01-01

    The purpose of this paper is to present the Loads and Aeroelasticity Division's research accomplishments for FY87 and research plans for FY88. The work under each Branch (technical area) is described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to five year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  9. Development of tools and techniques for momentum compression of fast rare isotopes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David J. Morrissey; Bradley M. Sherrill; Oleg Tarasov

    2010-11-21

    As part of our past research and development work, we have created and developed the LISE++ simulation code [Tar04, Tar08]. The LISE++ package was significantly extended with the addition of a Monte Carlo option that includes an option for calculating ion trajectories using a Taylor-series expansion up to fifth order, and implementation of the MOTER Monte Carlo code [Kow87] for ray tracing of the ions into the suite of LISE++ codes. The MOTER code was rewritten from FORTRAN into C++ and transported to the MS-Windows operating system. Extensive work went into the creation of a user-friendly interface for the code.more » An example of the graphical user interface created for the MOTER code is shown in the left panel of Figure 1 and the results of a typical calculation for the trajectories of particles that pass through the A1900 fragment separator are shown in the right panel. The MOTER code is presently included as part of the LISE++ package for downloading without restriction by the worldwide community. The LISE++ was extensively developed and generalized to apply to any projectile fragment separator during the early phase of this grant. In addition to the inclusion of the MOTER code, other important additions to the LISE++ code made during FY08/FY09 are listed. The LISE++ is distributed over the web (http://groups.nscl.msu.edu/lise ) and is available without charge to anyone by anonymous download, thus, the number of individual users is not recorded. The number of 'hits' on the servers that provide the LISE++ code is shown in Figure 3 for the last eight calendar years (left panel) along with the country from the IP address (right panel). The data show an increase in web-activity with the release of the new version of the program during the grant period and a worldwide impact. An important part of the proposed work carried out during FY07, FY08 and FY09 by a graduate student in the MSU Physics program was to benchmark the codes by comparison of detailed measurements to the LISE++ predictions. A large data set was obtained for fission fragments from the reaction of 238U ions at 81 MeV/u in a 92 mg/cm2 beryllium target with the A1900 projectile fragment separator. The data were analyzed and form the bulk of a Ph.D. dissertation that is nearing completion. The rich data set provides a number of benchmarks for the improved LISE++ code and only a few examples can be shown here. The primary information obtained from the measurements is the yield of the products as a function of mass, charge and momentum. Examples of the momentum distributions of individually identified fragments can be seen in Figures 2 and 4 along with comparisons to the predicted distributions. The agreement is remarkably good and indicates the general validity of the model of the nuclear reactions producing these fragments and of the higher order transmission calculations in the LISE++ code. The momentum distributions were integrated to provide the cross sections for the individual isotopes. As shown in Figure 5, there is good agreement with the model predictions although the observed cross sections are a factor of five or so higher in this case. Other comparisons of measured production cross sections from abrasion-fission reactions have been published by our group working at the NSCL during this period [Fol09] and through our collaboration with Japanese researchers working at RIKEN with the BigRIPS separator [Ohn08, Ohn10]. The agreement of the model predictions with the data obtained with two different fragment separators is very good and indicates the usefulness of the new LISE++ code.« less

  10. HPC Access Using KVM over IP

    DTIC Science & Technology

    2007-06-01

    these devices coupled with the difficulties- working with IP Video Systems (formerly Teraburst and cost-of installing dedicated long-distance fiber optic...dedicated fiber is best revealed that the IP Video Systems solutions seem to be suited for installation for point-to-point communications. the best...Research completion of the SBIR Phase II effort is planned for late (SBIR) effort with IP Video Systems (formerly known as FY 07. This paper will discuss

  11. Fort Collins Science Center: Fiscal Year 2007 Accomplishments

    USGS Publications Warehouse

    Wilson, J.T.

    2008-01-01

    In Fiscal Year 2007 (FY07), the U.S. Geological Survey (USGS) Fort Collins Science Center (FORT) continued research vital to U.S. Department of the Interior science and management needs and associated USGS programmatic goals. FORT work also supported the science needs of other government agencies as well as private cooperators. Specifically, FORT scientific research and technical assistance focused on client and partner needs and goals in the areas of biological information management, fisheries and aquatic systems, invasive species, status and trends of biological resources, terrestrial ecosystems, and wildlife resources. In addition, FORT's 5-year strategic plan was refined to incorporate focus areas identified in the USGS strategic science plan, including ecosystem-landscape analysis, global climate change, and energy and mineral resource development. As a consequence, several science projects initiated in FY07 were either entirely new research dor amplifications of existing work. Highlights of FORT project accomplishments are described below under the USGS science program with which each task is most closely associated. The work of FORT's 6 branches (Aquatic Systems and Technology Applications, Ecosystem Dynamics, Information Science, Invasive Species Science, Policy Analysis and Science Assistance, and Species and Habitats of Federal Interest) often involves major partnerships with other agencies or cooperation with other USGS disciplines (Geology, Geography, Water Resources) and the Geospatial Information Office.

  12. Mass Transit: Implementation of FTA’s New Starts Evaluation Process and FY 2001 Funding Proposals

    DTIC Science & Technology

    2000-04-01

    formalize the process. FTA issued a proposed rule on April 7, 1999, and plans to issue final regulations by the summer of 2000. In selecting projects for...commit funds to any more New Starts projects during the last 2 years of TEA-21—through fiscal year 2003. Because there are plans for many more...regional review of alternatives, develop preliminary engineering plans , and meet FTA’s approval for the final design. TEA-21 requires that FTA evaluate

  13. Annual Plan for the EPA - FY 2011

    EPA Pesticide Factsheets

    This plan identifies mandated and selected assignment topics continuing from FY 2010 and scheduled to be started during FY 2011, providing for unforeseen work requested by Agency leadership and Congress, and through ongoing OIG Hotline activities.

  14. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-17

    observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crossno, Patricia Joyce; Dunlavy, Daniel M.; Stanton, Eric T.

    This report is a summary of the accomplishments of the 'Scalable Solutions for Processing and Searching Very Large Document Collections' LDRD, which ran from FY08 through FY10. Our goal was to investigate scalable text analysis; specifically, methods for information retrieval and visualization that could scale to extremely large document collections. Towards that end, we designed, implemented, and demonstrated a scalable framework for text analysis - ParaText - as a major project deliverable. Further, we demonstrated the benefits of using visual analysis in text analysis algorithm development, improved performance of heterogeneous ensemble models in data classification problems, and the advantages ofmore » information theoretic methods in user analysis and interpretation in cross language information retrieval. The project involved 5 members of the technical staff and 3 summer interns (including one who worked two summers). It resulted in a total of 14 publications, 3 new software libraries (2 open source and 1 internal to Sandia), several new end-user software applications, and over 20 presentations. Several follow-on projects have already begun or will start in FY11, with additional projects currently in proposal.« less

  16. Evaluating the Productivity of VA, NIH, and AHRQ Health Services Research Career Development Awardees.

    PubMed

    Finney, John W; Amundson, Erin O; Bi, Xiaoyu; Cucciare, Michael A; Eisen, Seth A; Finlay, Andrea K; Halvorson, Max A; Hayashi, Ko; Owens, Douglas K; Maisel, Natalya C; Timko, Christine; Weitlauf, Julie C; Cronkite, Ruth C

    2016-04-01

    To evaluate the academic advancement and productivity of Department of Veterans Affairs Health Services Research and Development (HSR&D) Career Development Award (CDA) program recipients, National Institutes of Health (NIH) K awardees in health services research (HSR), and Agency for Healthcare Research and Quality (AHRQ) K awardees. In all, 219 HSR&D CDA recipients from fiscal year (FY) 1991 through FY2010; 154 NIH K01, K08, and K23 awardees FY1991-FY2010; and 69 AHRQ K01 and K08 awardees FY2000-FY2010 were included. Most data were obtained from curricula vitae. Academic advancement, publications, grants, recognition, and mentoring were compared after adjusting for years since award, and personal characteristics, training, and productivity prior to the award. No significant differences emerged in covariate-adjusted tenure-track academic rank, number of grants as primary investigator (PI), major journal articles as first/sole author, Hirsch h-index scores, likelihood of a journal editorship position or membership in a major granting review panel, or mentoring postgraduate researchers between the HSR&D CDA and NIH K awardees from FY1991-FY2010, or among the three groups of awardees from FY2000 or later. Among those who reported grant funding levels, HSR&D CDAs from FY1991-2010 had been PI on more grants of $100,000 than NIH K awardees. HSR&D CDAs had a higher mean number of major journal articles than NIH K awardees from FY1991-2010. Findings show that all three HSR career development programs are successfully selecting and mentoring awardees, ensuring additional HSR capacity to improve the quality and delivery of high-value care.

  17. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  18. 40 CFR 52.498 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Requirements for state implementation plan revisions relating to new motor vehicles. 52.498 Section 52.498 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.498...

  19. 40 CFR 52.381 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Requirements for state implementation plan revisions relating to new motor vehicles. 52.381 Section 52.381 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.381 Requirements fo...

  20. 40 CFR 52.433 - Requirements for state implementation plan revisions relating to new motor vehicles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Requirements for state implementation plan revisions relating to new motor vehicles. 52.433 Section 52.433 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.433 Requirements for...

  1. Annual Plan for the EPA - FY 2012

    EPA Pesticide Factsheets

    This plan identifies mandated and selected assignment topics continuing from fiscal year (FY) 2011 and scheduled to be started during FY 2012, providing for unforeseen work that may be requested by hotline complaints, EPA leadership, and Congress.

  2. FY-09 Summary Report to the Office of Petroleum Reserves on the Western Energy Corridor Initiative Activities and Accomplishments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas R. Wood

    2010-01-01

    To meet its programmatic obligations under the Energy Policy Act of 2005, the Office of Naval Petroleum and Shale Oil Reserves (NPSOR) has initiated the Western Energy Corridor Initiative (WECI). The WECI will implement the Unconventional Strategic Fuels Task Force recommendations for accelerating and promoting the development of domestic unconventional fuels to help meet the nations’ energy needs. The mission of the WECI is to bolster America’s future fuel security by facilitating socially and environmentally responsible development of unconventional fuels resources in the Western Energy Corridor, using sound engineering principles and science-based methods to define and assess benefits, impacts, uncertainties,more » and mitigation options and to resolve impediments. The Task Force proposed a three-year program in its commercialization plan. The work described herein represents work performed by Idaho National Laboratory (INL) in support of the DOE’s WECI. This effort represents an interim phase of work, designed to initiate only select portions of the initiative, limited by available funding resources within NPOSR. Specifically, the work presented here addresses what was accomplished in FY-09 with the remaining carryover (~$420K) from NPOSR FY-08 funds. It was the intent of the NPOSR program to seek additional funding for full implementation of the full scope of work; however, the original tasks were reduced in scope, terminated, or eliminated (as noted below). An effort is ongoing to obtain funding to continue the tasks initiated under this project. This study will focus on the integrated development of multiple energy resources in a carbon-neutral and environmentally acceptable manner. Emphasis will be placed on analyses of the interrelationships of various energy-resource development plans and the infrastructure, employment, training, fiscal, and economic demands placed on the region as a result of various development scenarios. The interactions at build-out during the design, permitting, and construction of individual and multiple energy developments are not fully considered at the local, state, regional, or national levels. The net impacts to the Western Energy Corridor cannot be understood and the design optimized under the current approach. A regional development plan is needed to model cumulative impacts, determine the carrying capacity of the basin, and provide valuable technically based information to both skeptics and advocates. The INL scope of work for FY-09 involved six tasks: 1. Evaluation of the ASPEN Code as a dynamic systems model for application and use under the WECI and communications with Alberta Oil Sands Research Institutions as an “analog” resource development in the Western Energy Corridor 2. Application of the Aspen Plus computer model to several oil shale processes to consider energy balances and inputs and outputs (e.g. water consumption, CO2 production, etc.) 3. Development of a regulatory roadmap for oil shale developments 4. Defining of the physiographic extent of the natural resource reserves that comprise the Western Energy Corridor 5. A review of the Unconventional Fuels Task Force Report to Congress for ideas, concepts and recommendations that crosscutting plans 6. Program development with stakeholders, including industry, academics, state and federal agencies, and non government organizations. This task also includes project management, strategic development and reporting.« less

  3. Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

    DTIC Science & Technology

    2016-05-27

    observers regarding the current and future size and capabilities of the Navy. The Navy’s proposed FY2017 budget requests funding for the procurement...average of about $15.2 billion per year during the final 10 years of the plan. An October 2015 Congressional Budget Office (CBO) report on the Navy’s...Potential issues for Congress in reviewing the Navy’s proposed FY2017 shipbuilding budget , its proposed FY2017-FY2021 five-year shipbuilding plan, and

  4. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2005-05-31

    building a new amphibious assault ship called LHD-8 and is also procuring new LPD-17 class amphibious ships. A total of 12 LPD-17s were originally planned ...but the FY2006-FY2011 Future Years Defense Plan (FYDP) proposes reducing that figure to nine, with the final two to be procured in FY2006 and FY2007...Three developments have caused the Navy to reconsider its plans for procuring amphibious ships, maritime prepositioning ships, and connector ships

  5. Implementation of a new algorithm for Density Equalizing Map Projections (DEMP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Close, E.R.; Merrill, D.W.; Holmes, H.H.

    The purpose of the PAREP (Populations at Risk to Environmental Pollution) Project at Lawrence Berkeley National Laboratory (LBNL), an ongoing Department of Energy (DOE) project since 1978, is to develop resources (data, computing techniques, and biostatistical methodology) applicable to DOE`s needs. Specifically, the PAREP project has developed techniques for statistically analyzing disease distributions in the vicinity of supposed environmental hazards. Such techniques can be applied to assess the health risks in populations residing near DOE installations, provided adequate small-area health data are available. The FY 1994 task descriptions for the PAREP project were determined in discussions at LBNL on 11/2/93.more » The FY94 PAREP Work Authorization specified three major tasks: a prototype small area study, a feasibility study for obtaining small-area data, and preservation of the PAREP data archive. The complete FY94 work plan, and the subtasks accomplished to date, were included in the Cumulative FY94 progress report.« less

  6. Department of the Navy Transformation Plan: FY 2014-2016

    Science.gov Websites

    alignment don business priorities (fy14-16) strategic opportunities for transformation don institutional Closing... summary don transformation model Download PDF Submit an Idea Department of the Navy Transformation Plan FY 2014-2016

  7. Louisiana SIP: LAC 33:III Ch. 14 Subchap A, 1401 to 1415--Determining Conformity of General Federal Actions to State or Federal Implementation Plans; SIP effective 1996-11-12 (LAc67) and 1998-05-08 (LAc75)

    EPA Pesticide Factsheets

    Louisiana SIP: LAC 33:III Ch. 14 Subchap A, 1401 to 1415--Determining Conformity of General Federal Actions to State or Federal Implementation Plans; SIP effective 1996-11-12 (LAc67) and 1998-05-08 (LAc75)

  8. WEC-SIM Validation Testing Plan FY14 Q4.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ruehl, Kelley Michelle

    2016-02-01

    The WEC-Sim project is currently on track, having met both the SNL and NREL FY14 Milestones, as shown in Table 1 and Table 2. This is also reflected in the Gantt chart uploaded to the WEC-Sim SharePoint site in the FY14 Q4 Deliverables folder. The work completed in FY14 includes code verification through code-to-code comparison (FY14 Q1 and Q2), preliminary code validation through comparison to experimental data (FY14 Q2 and Q3), presentation and publication of the WEC-Sim project at OMAE 2014 [1], [2], [3] and GMREC/METS 2014 [4] (FY14 Q3), WEC-Sim code development and public open-source release (FY14 Q3), andmore » development of a preliminary WEC-Sim validation test plan (FY14 Q4). This report presents the preliminary Validation Testing Plan developed in FY14 Q4. The validation test effort started in FY14 Q4 and will go on through FY15. Thus far the team has developed a device selection method, selected a device, and placed a contract with the testing facility, established several collaborations including industry contacts, and have working ideas on the testing details such as scaling, device design, and test conditions.« less

  9. DoDEA Seniors' Postsecondary Plans and Scholarships, 2008

    ERIC Educational Resources Information Center

    Department of Defense Education Activity, 2008

    2008-01-01

    This report summarizes the postsecondary plans and scholarship monies of graduates of Department of Defense Education Activity (DoDEA) high school seniors in SY07-08. Postsecondary plans represent the intentions of seniors the year after graduation. Students indicate whether they plan to attend a 4-year college/university, junior/community…

  10. A Comparison of Services Utilized by Acupuncture and Non-Acupuncture Patients in the Military Health System

    DTIC Science & Technology

    2009-06-26

    three diagnoses of acupuncture patients within the MHS in FY08 were: (a) Lumbago, (b) Myalgia and Myositis unspecified, and (c) Cervicalgia. Table 1...of Total Diagnosis Description Encounters Lumbago Myalgia and Myositis unspecified Cervical gia Acute or chronic pain in the lumbar or sacral...Lumbago, Myalgia and Myositis unspecified, or Cervicalgia during FY08. This study is based off the CNA study of CAM usage in the MHS conducted by Jaditz

  11. 40 CFR 85.1804 - Approval of Plan: Implementation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Approval of Plan: Implementation. 85.1804 Section 85.1804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE SOURCES Recall Regulations § 85.1804 Approval of Plan...

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less

  13. FTA multi-year research program plan (FY 2009 - FY 2013).

    DOT National Transportation Integrated Search

    2008-09-01

    The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    NREL's Site Sustainability Plan FY 2015 reports on sustainability plans for the lab for the year 2015 based on Executive Order Goals and provides the status on planned actions cited in the FY 2014 report.

  15. Planning for Pre-Exascale Platform Environment (Fiscal Year 2015 Level 2 Milestone 5216)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Springmeyer, R.; Lang, M.; Noe, J.

    This Plan for ASC Pre-Exascale Platform Environments document constitutes the deliverable for the fiscal year 2015 (FY15) Advanced Simulation and Computing (ASC) Program Level 2 milestone Planning for Pre-Exascale Platform Environment. It acknowledges and quantifies challenges and recognized gaps for moving the ASC Program towards effective use of exascale platforms and recommends strategies to address these gaps. This document also presents an update to the concerns, strategies, and plans presented in the FY08 predecessor document that dealt with the upcoming (at the time) petascale high performance computing (HPC) platforms. With the looming push towards exascale systems, a review of themore » earlier document was appropriate in light of the myriad architectural choices currently under consideration. The ASC Program believes the platforms to be fielded in the 2020s will be fundamentally different systems that stress ASC’s ability to modify codes to take full advantage of new or unique features. In addition, the scale of components will increase the difficulty of maintaining an errorfree system, thus driving new approaches to resilience and error detection/correction. The code revamps of the past, from serial- to vector-centric code to distributed memory to threaded implementations, will be revisited as codes adapt to a new message passing interface (MPI) plus “x” or more advanced and dynamic programming models based on architectural specifics. Development efforts are already underway in some cases, and more difficult or uncertain aspects of the new architectures will require research and analysis that may inform future directions for program choices. In addition, the potential diversity of system architectures may require parallel if not duplicative efforts to analyze and modify environments, codes, subsystems, libraries, debugging tools, and performance analysis techniques as well as exploring new monitoring methodologies. It is difficult if not impossible to selectively eliminate some of these activities until more information is available through simulations of potential architectures, analysis of systems designs, and informed study of commodity technologies that will be the constituent parts of future platforms.« less

  16. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-10-01

    planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious force that...state, reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding plan ...13 Service Life Extensions for Amphibious Ships . . . . . . . . . . . . . . . . . . 13 Planned MPF(F) Squadron

  17. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... contingency plan must be designed to minimize hazards to human health or the environment from fires...

  18. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Purpose and implementation of contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... plan must be designed to minimize hazards to human health or the environment from fires, explosions, or...

  19. 40 CFR 63.5707 - What is an implementation plan for open molding operations and when do I need to prepare one?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 12 2010-07-01 2010-07-01 true What is an implementation plan for open... AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing Standards for Open Molding Resin and Gel Coat Operations § 63.5707 What is an implementation plan...

  20. 18 CFR Appendix A to Part 11 - Fee Schedule for FY 2010

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Custer 47.08 Colorado Delta 62.78 Colorado Denver * 31.39 Colorado Dolores 31.39 Colorado Douglas 94.17... Michigan Delta 47.08 Michigan Dickinson 47.08 Michigan Eaton 94.17 Michigan Emmet 94.17 Michigan Genesee... Minnesota Cook 47.08 Minnesota Cottonwood 47.08 Minnesota Crow Wing 31.39 Minnesota Dakota 94.17 Minnesota...

  1. 40 CFR 52.1770 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FR 61213 Sect .0507 Particulates from Chemical Fertilizer Manufacturing Plants 04/01/03 09/17/03, 68... Organic Compounds Sect .0901 Definitions 07/01/96 08/01/97, 62 FR 41277 Sect .0902 Applicability 07/01/00... FR 61213 Repealed. Sect .0939 Determination of Volatile Organic Compounds Emissions 07/01/88 01/16/90...

  2. Alaska Department of Natural Resources

    Science.gov Websites

    /08/2018 First Day Hikes planned in Delta Junction, Homer, Sitka, Ketchikan, and Juneau 12/27/2017 searchable online tool 07/31/2017 Contracts awarded for private operation of Delta Area state parks 07/31 Outdoor Recreation Director 07/06/2017 State seeks private contractors to operate Delta Area state parks

  3. Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.

  4. San Diego transit five year plan update : FY 1982-1986

    DOT National Transportation Integrated Search

    1981-07-01

    The Five Year Plan Update constitutes the annual revision to the operating plan and capital program for the following five year planning period, presents its adopted budget and a specific operating plan and capital program for FY 1982 as well as less...

  5. Annual Plan - Fiscal Year 2010 (revised)

    EPA Pesticide Factsheets

    This plan identifies topics continuing from FY 2009 and the first half of FY 2010, and scheduled to be started in the second half of FY 2010, providing for unforeseen work in the latter part of the year directed by a new Inspector General, and from new EPA

  6. The NASA/DOE/DOD nuclear rocket propulsion project - FY 1991 status

    NASA Technical Reports Server (NTRS)

    Clark, John S.; Miller, Thomas J.

    1991-01-01

    NASA has initiated planning and critical technology development for nuclear rocket propulsion systems for Space Exploration Initiative missions to the moon and to Mars. Interagency agreements are being negotiated between NASA, the Department of Energy, and the Department of Defense for joint technology development activities. This paper summarizes the activities of the NASA project planning team in FY 1990 that led to the draft Nuclear Propulsion Project Plan, outlines the FY 1991 Interagency activities, and describes the current status of the project plan.

  7. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-05-06

    planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious force that...reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding plan , if...extensions for existing amphibious ships, whether all the ships in the planned complementary Maritime Prepositionning Force of the Future (MPF[F

  8. Navy LPD-17 Amphibious Ship Procurement: Background, Issues, and Options for Congress

    DTIC Science & Technology

    2008-04-23

    by Reuters, “but we are incorporating the lessons from this experience into our operational plans going forward for new ships in the design, planning ...Navy’s planned 313-ship fleet calls for a 31-ship amphibious force that includes 10 LPD-17s, and the Marine Corps states that a 33-ship amphibious...officials state, reflects responsibilities assigned to Marine Corps forces in U.S. regional war plans . The Navy’s FY2009 30-year (FY2009-FY2038) shipbuilding

  9. 78 FR 27891 - Promulgation of State Implementation Plan Revisions; Infrastructure Requirements for the 1997 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... provision, the state has responsibility for ensuring adequate implementation of such plan provision. a... implementation of any plan provision are provided in MCA 75-2-112, Power and Responsibilities of Department. The... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0724; FRL-9812-9] Promulgation of...

  10. National Science Foundation proposed budget could see another increase

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2012-03-01

    President Barack Obama's proposed budget for the U.S. National Science Foundation (NSF) for fiscal year (FY) 2013 would provide the agency with $7.37 billion, a $340 million increase, 4.8% above the FY 2012 estimated budget under which NSF has been operating. NSF has fared well during previous budget cycles, and the Obama administration's budget document for FY 2013 states that “NSF plays a critical role in the implementation of the President's Plan for Science and Technology.” With federal agencies operating under tighter budgets in a difficult financial climate, NSF director Subra Suresh said the budget includes substantial increases for core programs, frontier science, education, and human resources. “I am confident that NSF merits the $7.4 billion the president proposed. I'm optimistic Congress will approve the budget,” Suresh said at a 13 February NSF budget briefing.

  11. 78 FR 4150 - Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-18

    ...; NIOSH-134-B] Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance AGENCY: National... Nanotechnology Strategic Plan for Research and Guidance. SUMMARY: The National Institute for Occupational Safety... NIOSH FY2013-FY2016 nanotechnology strategic plan. This draft strategic plan (Protecting the...

  12. 75 FR 47346 - Draft Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...://www.treas.gov/offices/management/budget/strategic-plan/2007-2012/strategic-plan2007-2012.pdf . The....ustreas.gov/offices/management/budget/strategic-plan/ and by clicking on the comment link. Comments may... DEPARTMENT OF THE TREASURY Draft Strategic Plan for FY 2010-2015 AGENCY: United States Department...

  13. 40 CFR 256.40 - Requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 25 2014-07-01 2014-07-01 false Requirements. 256.40 Section 256.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.40...

  14. 40 CFR 256.40 - Requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Requirements. 256.40 Section 256.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.40...

  15. 40 CFR 256.40 - Requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 24 2010-07-01 2010-07-01 false Requirements. 256.40 Section 256.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.40...

  16. 40 CFR 256.40 - Requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 26 2013-07-01 2013-07-01 false Requirements. 256.40 Section 256.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.40...

  17. 40 CFR 256.40 - Requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 26 2012-07-01 2011-07-01 true Requirements. 256.40 Section 256.40 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.40...

  18. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may be...

  19. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may be...

  20. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 32 2013-07-01 2013-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may be...

  1. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 32 2012-07-01 2012-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may be...

  2. 40 CFR 763.123 - May a State implement its own asbestos worker protection plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 31 2014-07-01 2014-07-01 false May a State implement its own asbestos... (CONTINUED) TOXIC SUBSTANCES CONTROL ACT ASBESTOS Asbestos Worker Protection § 763.123 May a State implement its own asbestos worker protection plan? This section describes the process under which a State may be...

  3. FY 2013 INL SITE SUSTAINABILITY PLAN WITH THE FY 2012 ANNUAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest L. Fossum; Steve A. Birrer

    2012-12-01

    It is the policy of the Department of Energy (DOE) that sustainable energy and transportation fuels management will be integrated into DOE operations to meet obligations under Executive Order (EO) 13423 "Strengthening Federal Environmental, Energy, and Transportation Management," the Instructions for Implementation of EO 13423, as well as Guidance Documents issued in accordance thereto and any modifcations or amendments that may be issued from time to time. In furtherance of this obligation, DOE established strategic performance-based energy and transportation fuels goals and strategies through the Transformational Energy Action Management (TEAM) Initiative, which were incorporated into DOE Order 430.2B "Departmental Energy,more » Renewable energy, and Transportation Management" and were also identified in DOE Order 450.1A, "Environmental Protection Program." These goals and accompanying strategies are to be implemented by DOE sites through the integration of energy and transportation fuels management into site Environmental Management Systems (EMS).« less

  4. An Analysis of the Economic Assumptions Underlying Fiscal Plans FY1981 - FY1984.

    DTIC Science & Technology

    1986-06-01

    OF THE ECONOMIC ASSUMPTIONS UNDERLYING FISCAL PLANS FY1981 - FY1984 by Robert Welch Beck June 1986 Thesis Advisor: P. M. CARRICK Approved for public ...DOWGRDIN SHEDLEApproved for public releace; it - 2b ECLSSIICAIONI DWNGAD G SHEDLEbut ion is unlimited. 4! PERFORMING ORGANIZATION REPORT NUMBER(S) S...SECURITY CLASSIFICATION OF T4𔃿 PAC~E All other editions are obsolete Approved for public release; distribution is unlimited. An Analysis of the

  5. Colorado Children's Budget 2011

    ERIC Educational Resources Information Center

    Colorado Children's Campaign, 2011

    2011-01-01

    "Colorado Children's Budget 2011" tallies up Colorado's public investments during FY 2007-08 through FY 2011-12 for programs and services that enhance the well-being of children across four domains--Early Childhood, K-12 Education, Health, and Other Supports. It is intended to be a resource guide for policymakers and advocates who are…

  6. 75 FR 44265 - Office of the Assistant Secretary for Planning and Evaluation; Request for Comments on the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-28

    ... planning process is an opportunity for the Department to further refine and strengthen the strategic goal... for Planning and Evaluation; Request for Comments on the Departmental FY 2010-2015 Strategic Plan... and Human Services Draft FY 2010-2015 Strategic Plan is provided as part of the strategic planning...

  7. National Highway Traffic Safety Administration FY 1995 Performance Plan

    DOT National Transportation Integrated Search

    1994-09-01

    The NHTSA Fiscal Year 1995 performance plan for the Government Performance and Results Act of 1993 (GPRA) is the second in the three year pilot phase of the Act. This plan differs from the FY 1994 plan in two respects: 1) it uses a different "perform...

  8. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Contents of implementation plan. 49.11016 Section 49.11016 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER... for agriculture burning permits. (j) Section 49.134Rule for forestry and silvicultural burning permits...

  9. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  10. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  11. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  12. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  13. 40 CFR 52.349 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.349 Control strategy: Carbon monoxide. (a) Revisions to the Colorado State Implementation Plan, Carbon Monoxide Redesignation Request...

  14. 40 CFR 52.346 - Air quality monitoring requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Air quality monitoring requirements. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.346 Air quality monitoring... VIII Administrator, the State submitted a revised Air Quality Monitoring State Implementation Plan. The...

  15. Structures and Dynamics Division research and technology plans for FY 1894 and accomplishments for FY 1982

    NASA Technical Reports Server (NTRS)

    Bales, K. S.

    1984-01-01

    The Objectives, Expected Results, Approach, and Fiscal Year FY 1984 Milestones for the Structures and Dynamics Division's research programs are examined. The FY 1983 Accomplishments are presented where applicable.

  16. Simulators Sustainment Management: Advanced Planning Information

    DTIC Science & Technology

    2006-05-23

    1M per year Competition Type: TSA II Small Business Set-A-Side, FFP Program Mgr : James H. Burks,507 ACSS/GFLC, (801) 586-1859; jim.burks...ACRONYM(S) 11. SPONSOR/MONITOR’S REPORT NUMBER(S) 12 . DISTRIBUTION/AVAILABILITY STATEMENT Approved for public release; distribution unlimited 13...BEST O G D E N A I R L O G I S T I C S C E N T E R Training Systems Business Opportunities FY06-07 HC-130P Weapon System Trainer T-38C Aircrew

  17. Bacterial cellulose synthesis mechanism of facultative anaerobe Enterobacter sp. FY-07.

    PubMed

    Ji, Kaihua; Wang, Wei; Zeng, Bing; Chen, Sibin; Zhao, Qianqian; Chen, Yueqing; Li, Guoqiang; Ma, Ting

    2016-02-25

    Enterobacter sp. FY-07 can produce bacterial cellulose (BC) under aerobic and anaerobic conditions. Three potential BC synthesis gene clusters (bcsI, bcsII and bcsIII) of Enterobacter sp. FY-07 have been predicted using genome sequencing and comparative genome analysis, in which bcsIII was confirmed as the main contributor to BC synthesis by gene knockout and functional reconstitution methods. Protein homology, gene arrangement and gene constitution analysis indicated that bcsIII had high identity to the bcsI operon of Enterobacter sp. 638; however, its arrangement and composition were same as those of BC synthesizing operon of G. xylinum ATCC53582 except for the flanking sequences. According to the BC biosynthesizing process, oxygen is not directly involved in the reactions of BC synthesis, however, energy is required to activate intermediate metabolites and synthesize the activator, c-di-GMP. Comparative transcriptome and metabolite quantitative analysis demonstrated that under anaerobic conditions genes involved in the TCA cycle were downregulated, however, genes in the nitrate reduction and gluconeogenesis pathways were upregulated, especially, genes in three pyruvate metabolism pathways. These results suggested that Enterobacter sp. FY-07 could produce energy efficiently under anaerobic conditions to meet the requirement of BC biosynthesis.

  18. Bacterial cellulose synthesis mechanism of facultative anaerobe Enterobacter sp. FY-07

    PubMed Central

    Ji, Kaihua; Wang, Wei; Zeng, Bing; Chen, Sibin; Zhao, Qianqian; Chen, Yueqing; Li, Guoqiang; Ma, Ting

    2016-01-01

    Enterobacter sp. FY-07 can produce bacterial cellulose (BC) under aerobic and anaerobic conditions. Three potential BC synthesis gene clusters (bcsI, bcsII and bcsIII) of Enterobacter sp. FY-07 have been predicted using genome sequencing and comparative genome analysis, in which bcsIII was confirmed as the main contributor to BC synthesis by gene knockout and functional reconstitution methods. Protein homology, gene arrangement and gene constitution analysis indicated that bcsIII had high identity to the bcsI operon of Enterobacter sp. 638; however, its arrangement and composition were same as those of BC synthesizing operon of G. xylinum ATCC53582 except for the flanking sequences. According to the BC biosynthesizing process, oxygen is not directly involved in the reactions of BC synthesis, however, energy is required to activate intermediate metabolites and synthesize the activator, c-di-GMP. Comparative transcriptome and metabolite quantitative analysis demonstrated that under anaerobic conditions genes involved in the TCA cycle were downregulated, however, genes in the nitrate reduction and gluconeogenesis pathways were upregulated, especially, genes in three pyruvate metabolism pathways. These results suggested that Enterobacter sp. FY-07 could produce energy efficiently under anaerobic conditions to meet the requirement of BC biosynthesis. PMID:26911736

  19. 40 CFR 52.2062 - Plan approvals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Plan approvals. 52.2062 Section 52.2062... PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Pennsylvania § 52.2062 Plan approvals. (a) Emission limitations and related provisions which are established in Pennsylvania plan approvals as federally...

  20. 40 CFR 52.1070 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... availability of this material at NARA, call 202-741-6030, or go to: http://www.archives.gov/federal_register... Portable Fuel Containers 6/18/07 7/17/08, 73 FR 40970 26.11.13.08 Control of VOC Emissions from Marine... Recodification of existing Regulation .15; Amended. 26.11.32.19 Recordkeeping and Availability of Requested...

  1. 40 CFR 52.376 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.376 Control strategy: Carbon... submitted a revision to the carbon monoxide State Implementation Plan for the 1990 base year emission...

  2. 40 CFR 52.350 - Control strategy: Ozone.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control strategy: Ozone. 52.350 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.350 Control strategy: Ozone. (a) Revisions to the Colorado State Implementation Plan, 1-hour ozone NAAQS Redesignation Request and Maintenance...

  3. 40 CFR 52.350 - Control strategy: Ozone.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Control strategy: Ozone. 52.350 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.350 Control strategy: Ozone. (a) Revisions to the Colorado State Implementation Plan, 1-hour ozone NAAQS Redesignation Request and Maintenance...

  4. 40 CFR 52.350 - Control strategy: Ozone.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Control strategy: Ozone. 52.350 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.350 Control strategy: Ozone. (a) Revisions to the Colorado State Implementation Plan, 1-hour ozone NAAQS Redesignation Request and Maintenance...

  5. 40 CFR 52.350 - Control strategy: Ozone.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: Ozone. 52.350 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.350 Control strategy: Ozone. (a) Revisions to the Colorado State Implementation Plan, 1-hour ozone NAAQS Redesignation Request and Maintenance...

  6. 40 CFR 52.350 - Control strategy: Ozone.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control strategy: Ozone. 52.350 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.350 Control strategy: Ozone. (a) Revisions to the Colorado State Implementation Plan, 1-hour ozone NAAQS Redesignation Request and Maintenance...

  7. 40 CFR 52.510 - Small business assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.510 Small business... Regulation Administration submitted a plan for the establishment and implementation of a Small Business...

  8. 40 CFR 52.352 - Interstate transport.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Interstate transport. 52.352 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.352 Interstate transport. Addition to the Colorado State Implementation Plan of the Colorado Interstate Transport SIP regarding the 1997 8-Hour Ozone...

  9. 40 CFR 52.352 - Interstate transport.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interstate transport. 52.352 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Colorado § 52.352 Interstate transport. Addition to the Colorado State Implementation Plan of the Colorado Interstate Transport SIP regarding the 1997 8-Hour Ozone...

  10. 40 CFR 52.283 - Interstate Transport.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Interstate Transport. 52.283 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.283 Interstate Transport. Link to an... Resources Board submitted the “Interstate Transport State Implementation Plan (SIP) for the 1997 8-hour...

  11. 40 CFR 52.1533 - Emission inventories.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Emission inventories. 52.1533 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1533 Emission inventories... inventory for the entire state on January 26, 1993 as a revision to the State Implementation Plan (SIP...

  12. 40 CFR 52.510 - Small business assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.510 Small business... Regulation Administration submitted a plan for the establishment and implementation of a Small Business...

  13. 40 CFR 52.510 - Small business assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.510 Small business... Regulation Administration submitted a plan for the establishment and implementation of a Small Business...

  14. 40 CFR 52.510 - Small business assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.510 Small business... Regulation Administration submitted a plan for the establishment and implementation of a Small Business...

  15. 40 CFR 52.376 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.376 Control strategy: Carbon... submitted a revision to the carbon monoxide State Implementation Plan for the 1990 base year emission...

  16. 40 CFR 52.376 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.376 Control strategy: Carbon... submitted a revision to the carbon monoxide State Implementation Plan for the 1990 base year emission...

  17. 40 CFR 52.376 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.376 Control strategy: Carbon... submitted a revision to the carbon monoxide State Implementation Plan for the 1990 base year emission...

  18. 40 CFR 52.376 - Control strategy: Carbon monoxide.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control strategy: Carbon monoxide. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.376 Control strategy: Carbon... submitted a revision to the carbon monoxide State Implementation Plan for the 1990 base year emission...

  19. 40 CFR 49.10049 - Permits to operate.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Permits to operate. 49.10049 Section 49.10049 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow...

  20. 40 CFR 52.510 - Small business assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.510 Small business... Regulation Administration submitted a plan for the establishment and implementation of a Small Business...

  1. College of DuPage Information Technology Plan, Fiscal Year 1994-95.

    ERIC Educational Resources Information Center

    College of DuPage, Glen Ellyn, IL.

    Building upon four previous planning documents for computing at College of DuPage in Illinois, this plan for fiscal year 1995 (FY95) provides a starting point for future plans to address all activities that relate to the use of information technology on campus. The FY95 "Information Technology Plan" is divided into six sections, each…

  2. Coalition Warfare Program Presentation to: 2009 EUCOM/AFRICOM Science and Technology Conference

    DTIC Science & Technology

    2009-06-01

    compac an nexpens ve m cro- fluxgate magnetometer for use in multiple COCOMs. To continue T&E with joint services and apply lessons learned to...Partners in EUCOM/AFRICOM FY08 Starts • Advanced Dynamic Magnetometer FY09 Starts • ADNS Coalition Network FY10 New Starts • Clip-on Night Vision...Partner 2008 New Starts Advanced Dynamic Magnetometer for Static and Moving Applications T d l t d i i i US Navy (SPAWAR) Italy, Sweden o eve op a a

  3. 75 FR 8916 - Glenn/Colusa County Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ...) Introductions, (2) Approve Minutes, (3) RAC Admin Updates, (4) Public Comment, (5) FY08 and FY09 New Project... National Forest Supervisor's Office, 825 N. Humboldt Ave., Willows, CA 95988. Individuals who wish to speak... . SUPPLEMENTARY INFORMATION: The meeting will be open to the public. Committee discussion is limited to Forest...

  4. Information Resources Management Long Range Plan, FY 1995-1999

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.

  5. 40 CFR 52.726 - Control strategy: Ozone.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control strategy: Ozone. 52.726 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Illinois> § 52.726 Control strategy: Ozone. Link to an... State of Illinois to satisfy the condition of approval to the ozone State Implementation Plan listed in...

  6. 40 CFR 52.726 - Control strategy: Ozone.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control strategy: Ozone. 52.726 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Illinois> § 52.726 Control strategy: Ozone. Link to an... State of Illinois to satisfy the condition of approval to the ozone State Implementation Plan listed in...

  7. 40 CFR 52.1031 - EPA-approved Maine regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false EPA-approved Maine regulations. 52.1031... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maine § 52.1031 EPA-approved Maine... EPA as revisions to the Maine State Implementation Plan. This table is for informational purposes only...

  8. 40 CFR 52.1031 - EPA-approved Maine regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false EPA-approved Maine regulations. 52.1031... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maine § 52.1031 EPA-approved Maine... EPA as revisions to the Maine State Implementation Plan. This table is for informational purposes only...

  9. 40 CFR 112.3 - Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan. 112.3 Section 112.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions...

  10. 40 CFR 112.3 - Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Requirement to prepare and implement a Spill Prevention, Control, and Countermeasure Plan. 112.3 Section 112.3 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS OIL POLLUTION PREVENTION Applicability, Definitions...

  11. 40 CFR 52.2425 - Base Year Emissions Inventory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Base Year Emissions Inventory. 52.2425... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2425 Base Year Emissions Inventory. (a) EPA approves as a revision to the Virginia Implementation Plan the 1990 base year...

  12. 40 CFR 52.423 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.423 1990 Base Year Emission Inventory. EPA approves as a revision to the Delaware State Implementation Plan the 1990 base year emission...

  13. 40 CFR 52.1075 - Base year emissions inventory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Base year emissions inventory. 52.1075... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1075 Base year emissions inventory. (a) EPA approves as a revision to the Maryland State Implementation Plan the 1990 base...

  14. 40 CFR 52.2531 - Base year emissions inventory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Base year emissions inventory. 52.2531... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) West Virginia § 52.2531 Base year... revision to the West Virginia State Implementation Plan the 1990 base year emission inventories for the...

  15. 40 CFR 52.423 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.423 1990 Base Year Emission Inventory. EPA approves as a revision to the Delaware State Implementation Plan the 1990 base year emission...

  16. 40 CFR 52.1075 - Base year emissions inventory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Base year emissions inventory. 52.1075... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1075 Base year emissions inventory. (a) EPA approves as a revision to the Maryland State Implementation Plan the 1990 base...

  17. 40 CFR 52.423 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.423 1990 Base Year Emission Inventory. EPA approves as a revision to the Delaware State Implementation Plan the 1990 base year emission...

  18. 40 CFR 52.2425 - Base Year Emissions Inventory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Base Year Emissions Inventory. 52.2425... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2425 Base Year Emissions Inventory. (a) EPA approves as a revision to the Virginia Implementation Plan the 1990 base year...

  19. 40 CFR 52.1075 - Base year emissions inventory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Base year emissions inventory. 52.1075... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1075 Base year emissions inventory. (a) EPA approves as a revision to the Maryland State Implementation Plan the 1990 base...

  20. 40 CFR 52.2425 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2425 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Virginia Implementation Plan the 1990 base year...

  1. 40 CFR 52.1075 - 1990 base year emission inventory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false 1990 base year emission inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1075 1990 base year emission inventory. (a) EPA approves as a revision to the Maryland State Implementation Plan the 1990 base...

  2. 40 CFR 52.2425 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2425 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Virginia Implementation Plan the 1990 base year...

  3. 40 CFR 52.423 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.423 1990 Base Year Emission Inventory. EPA approves as a revision to the Delaware State Implementation Plan the 1990 base year emission...

  4. NASA earth science and applications division: The program and plans for FY 1988-1989-1990

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Described here are the Division's research goals, priorities and emphases for the next several years and an outline of longer term plans. Included are highlights of recent accomplishments, current activities in FY 1988, research emphases in FY 1989, and longer term future plans. Data and information systems, the Geodynamics Program, the Land Processes Program, the Oceanic Processes Program, the Atmospheric Dynamics and Radiation Program, the Atmospheric Chemistry Program, and space flight programs are among the topic covered.

  5. Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress

    DTIC Science & Technology

    2007-06-12

    up Northrop Grumman Ship Systems ( NGSS ). Table 2. FY2008-FY2013 Amphibious and MPF(F) Ship Procurement Plan (Ships fully funded in FY2006 shown for... Plan . . 13 Navy-Marine Corps Amphibious and Maritime Prepositioning Ship Programs: Background and Oversight Issues for Congress Introduction The...is whether to approve, modify, or reject the Navy’s plans for procuring amphibious and MPF(F) ships. Decisions that Congress makes on this CRS-2 1 The

  6. Navy DDG-1000 Destroyer Program: Background, Oversight Issues, and Options for Congress

    DTIC Science & Technology

    2007-10-25

    production quantity of eight ships (one more than the Navy currently plans to procure). Shared Production Arrangement. NGSS and GD/BIW have agreed on a...X)). Navy plans call for procuring 7 DDG-1000s between FY2007 and FY2013. The first two DDG-1000s were procured in FY2007 and are being split...Congress for the DDG-1000 program include supporting the Navy’s proposed plans , using a block-buy arrangement for procuring several DDG-1000s, and

  7. Ohio Board of Regents Guidelines for Preparing FY 2009-FY 2014 Capital Plans

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2007

    2007-01-01

    As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2009-2014. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six year capital plan. Contents include: (1)…

  8. Ohio Board of Regents Guidelines for Preparing FY 2007-FY 2012 Capital Plans

    ERIC Educational Resources Information Center

    Ohio Board of Regents, 2005

    2005-01-01

    As with past practice, publishing this set of guidelines officially launches the higher education capital planning and budgeting process for fiscal years 2007-2012. The guidelines include a schedule, definitions, planning assumptions, statewide considerations, and instructions for presenting a six-year capital plan. Contents include: (1)…

  9. Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-11-01

    This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.

  10. 40 CFR 52.1070 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Revised .14B(1). 26.11.06.15 Nitrogen Oxides from Nitric Acid Plants 8/1/88 11/3/92, 57 FR 49651 (c)(90)(i....34.07 Initial NMOG Credit Account Balances 12/17/07 6/11/13; 78 FR 34911 26.11.34.08 Fleet Average...) Requirements 12/17/07 6/11/13; 78 FR 34911 26.11.34.10 Initial ZEV Credit Account Balances 12/17/07 6/11/13; 78...

  11. 76 FR 76769 - National Science Board; Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    .... FY 2012 Transfer Authority. Update on NSF FY 2013 Budget Development. Policies and planning for... STEM education plan. Discussion of the NSF STEM education research portfolio: getting from theory to...

  12. AR and TD Fossil Energy Materials Program. Quarterly progress report for the period ending December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1982-04-01

    The ORNL Fossil Energy Materials Program Office compiles and issues this combined quarterly progress report from camera-ready copies submitted by each of the participating subcontractor organizations. This report of activities on the program is organized in accordance with a work breakdown structure defined in the AR and TD Fossil Energy Materials Program Plan for FY 1982-1986 in which projects are organized according to fossil energy technologies. This report is divided into parts and chapters with each part describing projects related to a particular fossil energy technology. Chapters within a part provide details of the various projects associated with that technology.more » We hope this series of AR and TD Fossil Energy Materials Program quarterly progress reports will aid in the dissemination of information developed on the program. Plans for the program will be issued annually. A draft of the program plan for FY 1982 to 1986 has been prepared and is in the review process. The implementation of these plans will be reflected by these quarterly progress reports, and this dissemination of information will bw augmented by topical or final reports as appropriate.« less

  13. Ernest Orlando Lawrence Berkeley National Laboratory institutional plan, FY 1996--2001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    The FY 1996--2001 Institutional Plan provides an overview of the Ernest Orlando Lawrence Berkeley National Laboratory mission, strategic plan, core business areas, critical success factors, and the resource requirements to fulfill its mission in support of national needs in fundamental science and technology, energy resources, and environmental quality. The Laboratory Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Core Business Areas section identifies those initiatives that are potential new research programs representing major long-term opportunities for the Laboratory, and the resources required for their implementation. It alsomore » summarizes current programs and potential changes in research program activity, science and technology partnerships, and university and science education. The Critical Success Factors section reviews human resources; work force diversity; environment, safety, and health programs; management practices; site and facility needs; and communications and trust. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process. The plan identifies technical and administrative directions in the context of the national energy policy and research needs and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office of Planning and Communications from information contributed by the Laboratory`s scientific and support divisions.« less

  14. Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pava, Daniel S.

    This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less

  15. 40 CFR 52.370 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Identification of plan. 52.370 Section 52.370 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.370 Identification of plan. (a) Title of plan: “State of Connecticut Air...

  16. 40 CFR 52.370 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Identification of plan. 52.370 Section 52.370 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.370 Identification of plan. (a) Title of plan: “State of Connecticut Air...

  17. 40 CFR 52.76 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.76 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Alaska State Implementation Plan the 1990 Base Year Carbon...

  18. 40 CFR 52.76 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.76 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Alaska State Implementation Plan the 1990 Base Year Carbon...

  19. 40 CFR 52.76 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.76 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Alaska State Implementation Plan the 1990 Base Year Carbon...

  20. 40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Criteria and procedures: Motor vehicle... Projects Developed, Funded or Approved Under Title 23 U.S.C. or the Federal Transit Laws § 93.118 Criteria...(s) in the applicable implementation plan (or implementation plan submission). This criterion applies...

  1. 40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... RATA a minimum of 25 working days prior to actual testing. (C) Beginning on May 21, 2008, ExxonMobil...

  2. 40 CFR 52.76 - 1990 Base Year Emission Inventory.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false 1990 Base Year Emission Inventory. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.76 1990 Base Year Emission Inventory. (a) EPA approves as a revision to the Alaska State Implementation Plan the 1990 Base Year Carbon...

  3. 78 FR 64970 - New Deadlines for Public Comment on Draft Environmental Documents

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ... interested parties to contact Service personnel and Web sites for information about these draft documents. As..., fdsys/pkg/FR-2013- CO; Comprehensive Conservation 08-07/pdf/2013- Plan and Environmental Impact 19052.pdf. Statement; Two Ponds National Wildlife Refuge, Arvada, CO; Comprehensive Conservation Plan and...

  4. 75 FR 52771 - Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-27

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-08] Notice of Availability: Notice of Funding Availability (NOFA) for Fiscal Year (FY) 2010 Indian Community Development Block Grant... retained to fund Imminent Threat Grants. The purpose of the ICDBG program is the development of viable...

  5. National Nanotechnology Initiative: The Initiative and Its Implementation Plan

    DTIC Science & Technology

    2000-07-01

    precisely controlled size and composition and then to assemble them into larger structures with unique properties and functions will revolutionize...thousand pounds could be stripped from a pilotless fighter aircraft , resulting in longer missions, and fighter agility could be dramatically improved...societal impact: $12 million. e. Major themes and new programs in FY 2001 include : • Nano-biotechnology: biosystems, bio-mimetics and composites (priority

  6. Research and development strategic plan : FY2013-FY2017.

    DOT National Transportation Integrated Search

    2013-05-01

    This plan describes the strategy through which the Federal Railroad Administrations (FRAs) research and development (R&D) program will support the Department of Transportations (DOTs) mission and goals. Safety is the DOTs primary strat...

  7. Strategic Management Plan: The Business of Defense FY2014-2015

    DTIC Science & Technology

    2013-07-01

    customer wait time ( CWT ) by three percent (from 14.1 days in FY2011 to 13.7 days in FY2012). The Army’s improvement was associated with receiving...rate from 86.2 percent in FY2011 to 87.1 percent in FY2012. The improvement to CWT and perfect order fulfillment means that the Warfighter receives

  8. 40 CFR 52.2186 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.2186 Section 52.2186 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  9. 40 CFR 52.1281 - Original identification of plan section.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Original identification of plan section. 52.1281 Section 52.1281 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Original identification of plan section. (a) This section identifies the original “Air Implementation Plan...

  10. 41 CFR 105-71.111 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false State plans. 105-71.111...-Award Requirements § 105-71.111 State plans. (a) Scope. The statutes for some programs require States to submit plans before receiving grants. Under regulations implementing Executive Order 12372...

  11. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1426 Original identification of plan section. (a) This section identifies the original “Nebraska Air Quality...

  12. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1426 Original identification of plan section. (a) This section identifies the original “Nebraska Air Quality...

  13. 40 CFR 52.1426 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Original identification of plan section... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1426 Original identification of plan section. (a) This section identifies the original “Nebraska Air Quality...

  14. FY 2016 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2016 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2016 program evaluations.

  15. FY 2017 Annual Performance Report (APR)

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2017 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2017 program evaluations.

  16. FY 2015 Annual Performance Report

    EPA Pesticide Factsheets

    Presents detailed performance results, as measured against the targets established in EPA’s FY 2015 Annual Plan and Budget. The Executive Overview section analyzes key performance outcomes and links to FY 2015 program evaluations.

  17. 40 CFR 52.1970 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan. 52.1970 Section 52.1970 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1970 Identification of plan. (a) Title of plan: “State of Oregon Clean...

  18. 40 CFR 52.1970 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Identification of plan. 52.1970 Section 52.1970 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1970 Identification of plan. (a) Title of plan: “State of Oregon Clean...

  19. 40 CFR 52.2170 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .../13/2006 72 FR 57864; 10/11/2007 74:36:03:02 Episode emergency contingency plan 6/13/2006 72 FR 57864... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Identification of plan. 52.2170 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Dakota § 52.2170 Identification of plan...

  20. 40 CFR 51.152 - Contingency plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Contingency plans. 51.152 Section 51.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Prevention of Air Pollution Emergency...

  1. NASA: 1986 long-range program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    For the years beyond FY 1986, the plan consists of activities that are technologically possible and considered to be in the national interest. Its implementation will ensure logical and continued progress in reaching the Nation's goals in aeronautics and space, consistent with the responsibilities assigned NASA by the National Aeronautics and Space Act of 1958, as amended. The major features of the programs are described in detail and the nature of the aeronautics and space programs beyond the year 2000 are projected. The abbreviations and acronyms that appear in this report are listed. The status of NASA's plans are summarized at the time of its preparation.

  2. The NASA Plan: To award eight percent of prime and subcontracts to socially and economically disadvantaged businesses

    NASA Technical Reports Server (NTRS)

    1990-01-01

    It is NASA's intent to provide small disadvantaged businesses, including women-owned, historically black colleges and universities and minority education institutions the maximum practicable opportunity to receive a fair proportion of NASA prime and subcontracted awards. Annually, NASA will establish socioeconomic procurement goals including small disadvantaged business goals, with a target of reaching the eight percent level by the end of FY 1994. The NASA Associate Administrators, who are responsible for the programs at the various NASA Centers, will be held accountable for full implementation of the socioeconomic procurement plans. Various aspects of this plan, including its history, are discussed.

  3. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  4. 36 CFR Exhibit B to Part 906 - Guidelines for Establishing Strategy To Implement Affirmative Action Personnel Plan

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 3 2013-07-01 2012-07-01 true Guidelines for Establishing Strategy To Implement Affirmative Action Personnel Plan B Exhibit B to Part 906 Parks, Forests, and Public... affirmative action policy in advertisements and employment literature. (3) Utilization of minority media in...

  5. 40 CFR 52.2420 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Identification of plan. 52.2420 Section 52.2420 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2420 Identification of plan. (a) Purpose and scope. This section sets...

  6. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...

  7. 34 CFR 369.43 - What are the affirmative action plan requirements affecting grantees?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the affirmative action plan requirements... affirmative action plan requirements affecting grantees? A recipient of Federal assistance must develop and implement an affirmative action plan to employ and advance in employment qualified individuals with...

  8. 29 CFR 97.11 - State plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true State plans. 97.11 Section 97.11 Labor Office of the... LOCAL GOVERNMENTS Pre-Award Requirements § 97.11 State plans. (a) Scope. The statutes for some programs require States to submit plans before receiving grants. Under regulations implementing Executive Order...

  9. 29 CFR 1915.502 - Fire safety plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...

  10. 29 CFR 1915.502 - Fire safety plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...

  11. 29 CFR 1915.502 - Fire safety plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Fire safety plan. 1915.502 Section 1915.502 Labor... Employment § 1915.502 Fire safety plan. (a) Employer responsibilities. The employer must develop and implement a written fire safety plan that covers all the actions that employers and employees must take to...

  12. 40 CFR 52.1836 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Change to approved plan. 52.1836... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1836 Change to... Air Pollutants, is removed from the approved plan. This change is a result of EPA's July 7, 1995...

  13. 40 CFR 52.1835 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Change to approved plan. 52.1835... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) North Dakota § 52.1835 Change to... Stationary Sources, is removed from the approved plan. This change is a result of the State's September 10...

  14. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Original identification of plan section. 52.2465 Section 52.2465 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2465 Original identification of plan section. (a)...

  15. 40 CFR 52.2465 - Original identification of plan section.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Original identification of plan section. 52.2465 Section 52.2465 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2465 Original identification of plan section. (a)...

  16. 75 FR 341 - FY 2010-FY 2011 Broad Agency Announcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... Agency's strategic plan and mission goals, as well as to provide the general public with information and... and programs associated with the Agency's strategic plan and mission goals, as well as to provide the... systematic approach that links our strategic goals through multi-year plans to the daily activities of our...

  17. 75 FR 59204 - Fisheries of the Northeastern United States; Northeast (NE) Multispecies Fishery; Reopening of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-27

    ... for addenda to the FY 2010 sector operations plans and contracts, and the supplemental environmental... sector operations plans and contracts and allocations of annual catch entitlement (ACE) for 17 NE... addenda to FY 2010 NE multispecies sector operations plans and contracts that would add certain exemptions...

  18. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft report.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding : of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or : "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement ...

  19. Hampton Roads, Virginia eight-hour ozone maintenance area transportation conformity analysis : 2030 long range transportation plan and FY 09-12 transportation improvement program, draft executive summary.

    DOT National Transportation Integrated Search

    2010-05-01

    This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...

  20. LDRD FY 2014 Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anita Gianotto; Dena Tomchak

    As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.

  1. FY 1998 Proposed Rail Improvement Program Supplement

    DOT National Transportation Integrated Search

    1997-01-01

    This FY 1998 Proposed Rail Improvement Program Supplement contains those rail plan amendments which have been published subsequent to the FY 1997 Proposed Rail Improvement program supplement. This document also contains the benefit/cost methodology u...

  2. System Requirements Analysis and Technological Support for the Ballistic Missile Defense System (BMDS) - FY07 Progress Report

    DTIC Science & Technology

    2007-07-01

    Systems , Boeing-led Airborne Laser Team Actively Tracks Airborne Target, Compensates for Atmospheric Turbulence and Fires Sur- rogate High-Energy Laser...7100 System Requirements Analysis and Technological Support for the Ballistic Missile Defense System (BMDS) FY07 Progress Report By...Office of Management and Budget , Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE July

  3. Cellulose synthesized by Enterobacter sp. FY-07 under aerobic and anaerobic conditions.

    PubMed

    Ma, Ting; Ji, Kaihua; Wang, Wei; Wang, Jinghong; Li, Zhaoyu; Ran, Haitao; Liu, Bin; Li, Guoqiang

    2012-12-01

    Enterobacter sp. FY-07 can produce bacterial cellulose (BC) under aerobic and anaerobic conditions. In static cultivation at 30 °C for 72 h under anoxic, oxygen-limited and aerated conditions, cellulose production exceeded 5 g/l, which indicated that oxygen was not essential for production of BC by Enterobacter sp. FY-07. X-ray diffraction (XRD), Fourier transform infrared spectroscopy (FT-IR) and scanning electron microscopy (SEM) analysis showed that the microstructure of the BC was similar to that produced by aerobic bacteria such as Gluconacetobacter xylinum BCRC12335 and Acetobacter sp. V6. The crystallinity index of the BC was 63.3%. Water-holding capacity (approximately 11000%) and rehydration ratio (24.4%) were superior to those reported for BC produced by the aerobic bacteria G. xylinum BCRC12335 and Acetobacter sp. V6. These results will facilitate static submerged fermentation for the production of BC. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. NASA Information Resources Management Long Range Plan, FY 1994-1998

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.

  5. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... the California State Implementation Plan, Placer County Air Pollution Control District and Sacramento... Pollution Control District (PCAPCD) and Sacramento Metropolitan Air Quality Management District (SMAQMD... Guidelines for Miscellaneous Metal and Plastic Parts Coatings,'' EPA-453/R-08-003, September 2008. 7...

  6. Batelle Energy Alliance, LLC (BEA) 2014 Annual report for Idaho National Laboratory (INL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, Juan; Allen, Todd

    2014-10-01

    This Fiscal Year (FY) 2014 annual report provides the Department of Energy (DOE) with BEA’s self-assessment of performance managing and operating the INL for the period ending September 30, 2014. After considering all of the information related to INL performance during the rating period against the Goals, Objectives and Notable Outcomes in the FY 2014 Performance Evaluation and Measurement Plan (PEMP), BEA believes it earned an overall grade closest to an A. The paragraphs below highlight how INL excelled in delivering innovative and impactful research across the three mission areas; how INL has successfully positioned itself for future growth andmore » sustainment; and how, through strong leadership, INL has set and implemented a strategic direction to ensure we meet and exceed the expectations of DOE and other customers. Attachments 1 through 5 provide additional detail on FY 2014 mission accomplishments, outline corporate contributions for success, highlight national and international awards and recognitions at the organization and individual levels, and describe the performance issues and challenges faced in FY 2014. • Attachment 1, “Self-Assessed PEMP Ratings” • Attachment 2, “INL Mission Accomplishments” • Attachment 3, “Battelle Energy Alliance, LLC Contributions to INL Success” • Attachment 4, “FY 2014 Awards, Recognition, Professional Roles and Certifications” • Attachment 5, “Performance Issues and Challenges.”« less

  7. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  8. Investing in Our Future. State Board of Education FY 07 Budget Recommendations and Annual Report

    ERIC Educational Resources Information Center

    Vermont Department of Education, 2006

    2006-01-01

    This report represents the State Board of Education's recommended FY 2007 budget as adopted by the Board on January 17, 2006. This budget supports the important work of Vermont's education system as the state invests in its future to help all Vermont students to achieve success. The FY 2007 budget proposal increases General Fund amounts by 6.15…

  9. Annual Plan for the EPA and CSB - FY 2018

    EPA Pesticide Factsheets

    Nov 9, 2017. FY 2018 plan reflects the priority work that the OIG believes is necessary to keep the EPA Administrator, the CSB, and Congress fully informed about problems and deficiencies relating to the administration of agency programs and operations.

  10. Lawrence Berkeley Laboratory, Institutional Plan FY 1994--1999

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-09-01

    The Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. For FY 1994-1999 the Institutional Plan reflects significant revisions based on the Laboratory`s strategic planning process. The Strategic Plan section identifies long-range conditions that will influence the Laboratory, as well as potential research trends and management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory, and the resources required for their implementation. The Scientific and Technical Programs section summarizesmore » current programs and potential changes in research program activity. The Environment, Safety, and Health section describes the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff diversity and development program. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The new section on Information Resources reflects the importance of computing and communication resources to the Laboratory. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The Institutional Plan is a management report for integration with the Department of Energy`s strategic planning activities, developed through an annual planning process.« less

  11. Environmental restoration and waste management five year plan, fiscal years 1994--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  12. Environmental restoration and waste management five year plan, fiscal years 1994--1998. Executive summary

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less

  13. 40 CFR 52.2185 - Change to approved plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Change to approved plan. 52.2185 Section 52.2185 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) South Dakota § 52.2185 Change to...

  14. Federal Student Aid (FSA) Five-Year Strategic Plan. FY 2004-2008

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The FSA Five-Year Strategic Plan is a roadmap for FY 2004-2008 that identifies five long-range strategic objectives, tactical short-term goals, and performance management initiatives. In working toward the goals outlined in the plan, FSA will address a number of key challenges, including legacy system migration, business process re-engineering,…

  15. 40 CFR 35.2102 - Water quality management planning.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  16. 40 CFR 52.370 - Identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Identification of plan. 52.370 Section 52.370 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.370 Identification of plan. Link to an amendment published at 78 FR 38591, 2013....

  17. 40 CFR 52.370 - Identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Identification of plan. 52.370 Section 52.370 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.370 Identification of plan. Link to an amendment published at 79 FR 32875, June ...

  18. National Water Program FY 2015 Performance, Trends and Best Practices Report

    EPA Pesticide Factsheets

    This Report includes final FY 2015 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2015 National Water Program Guidance Addendum.

  19. National Water Program Performance FY 2017 Trends, and Best Practices Report

    EPA Pesticide Factsheets

    This report includes FY 2017 performance data for all U.S. Environmental Protection Agency (EPA) National Water Program measures included in EPA's 2014-2018 Strategic Plan and the FY 2016-2017 National Water Program Guidance.

  20. FY11 Facility Assessment Study for Aeronautics Test Program

    NASA Technical Reports Server (NTRS)

    Loboda, John A.; Sydnor, George H.

    2013-01-01

    This paper presents the approach and results for the Aeronautics Test Program (ATP) FY11 Facility Assessment Project. ATP commissioned assessments in FY07 and FY11 to aid in the understanding of the current condition and reliability of its facilities and their ability to meet current and future (five year horizon) test requirements. The principle output of the assessment was a database of facility unique, prioritized investments projects with budgetary cost estimates. This database was also used to identify trends for the condition of facility systems.

  1. Government Performance and Results Act: Performance plan FY 1999, U.S. Nuclear Regulatory Commission. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fuches, J.L.

    1998-02-01

    The Nuclear Regulatory Commission`s (NRC) strategic plan [NUREG-1614, Vol. 1, September 1997] establishes a strategic framework that will guide future decision-making and will help the NRC continue to meet its responsibility for protecting public health and safety, promoting the common defense and security, and protecting the environment. This performance plan complements the agency`s strategic plan by setting annual goals with measurable target levels of performance for FY 1999, as required by the Government Performance and Results Act. No significant contribution was made to the preparation of the performance plan by any non-Federal entity. However, a contractor was used to helpmore » facilitate discussions and resolution of issues. Within six months after the close of FY 1999, the NRC will submit to the President and the Congress a report on program performance for FY 1999. This performance report will review the success of the agency in achieving the performance goals established for FY 1999. Where those goals have been achieved, the underlying assumptions and strategies will be examined to ensure that continued applicability is warranted in the future. If any of the FY 1999 performance goals are not met, the agency will conduct a thorough analysis of why it did not meet the goal and the actions necessary to meet-the goal in the future. One result of this analysis will be the documentation of plans and schedules for achieving the established performance goal. If the analysis should indicate that the performance goal is impractical or infeasible, the performance report will document why that is the case and what action is recommended.« less

  2. 40 CFR 52.1477 - Nevada air pollution emergency plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Nevada air pollution emergency plan. 52.1477 Section 52.1477 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1477 Nevada air...

  3. 40 CFR 52.1477 - Nevada air pollution emergency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Nevada air pollution emergency plan. 52.1477 Section 52.1477 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1477 Nevada air...

  4. 40 CFR 52.1477 - Nevada air pollution emergency plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Nevada air pollution emergency plan. 52.1477 Section 52.1477 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1477 Nevada air...

  5. Next Generation Safeguards Initiative Efforts at Los Alamos National Laboratory: Developing Our Human Capital FY2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevens, Rebecca S.; Hawkins Erpenbeck, Heather

    2015-10-13

    This report documents the accomplishments of the Safeguards HCD Fiscal Year 2015 (FY15) Project Work Plan, highlighting LANL’s work as well as the accomplishments of our NGSI-sponsored students, graduate and postdoctoral fellows, and mid-career professionals during this past year. While fiscal year 2015 has been a year of transition in the Human Capital Development area for LANL, we are working to revitalize our efforts to promote and develop Human Capital in Safeguards and Non-proliferation and are looking forward to implementing new initiatives in the coming fiscal year and continuing to transition the knowledge of staff who have been on assignmentmore » at IAEA and Headquarters to improve our support to HCD.« less

  6. 78 FR 4341 - Approval, Disapproval and Promulgation of State Implementation Plans; State of Utah; Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R08-OAR-2011-0114; FRL-9771-9] Approval, Disapproval and Promulgation of State Implementation Plans; State of Utah; Regional Haze Rule Requirements for Mandatory Class I Areas Under 40 CFR 51.309; Correction AGENCY: Environmental Protection Agency (EPA...

  7. 75 FR 28509 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-21

    ... the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District... approve revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... Joaquin Valley Unified Air Pollution Control District, No. 08-17309 (9th Circuit)). In that case, NAHB...

  8. Annual Plan - Fiscal Year 2010 (revised)

    EPA Pesticide Factsheets

    This OIG Annual Plan identifies mandated and selected assignment topics continuing from Fiscal Year (FY) 2009 and scheduled to be started in the first half of FY 2010, providing for unforeseen work in the latter part of the year that may be directed by a n

  9. Network speech systems technology program

    NASA Astrophysics Data System (ADS)

    Weinstein, C. J.

    1981-09-01

    This report documents work performed during FY 1981 on the DCA-sponsored Network Speech Systems Technology Program. The two areas of work reported are: (1) communication system studies in support of the evolving Defense Switched Network (DSN) and (2) design and implementation of satellite/terrestrial interfaces for the Experimental Integrated Switched Network (EISN). The system studies focus on the development and evaluation of economical and endurable network routing procedures. Satellite/terrestrial interface development includes circuit-switched and packet-switched connections to the experimental wideband satellite network. Efforts in planning and coordination of EISN experiments are reported in detail in a separate EISN Experiment Plan.

  10. FY16-20 Strategic Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harwell, Amber Suzanne

    2015-07-01

    Welcome to our FY16–FY20 Strategic Plan, which both refects our continued dedication to the work we do and reinforces the importance of the integrated Laboratories’ strategic framework to our future. This document is the result of the leadership team’s journey over the past few years in response to the needs of our nation. In an external environment that continues to change, sometimes in unexpected ways, it is critical that our mission areas and our foundation become increasingly synergistic, forming a whole whose parts are interdependent.

  11. Initial In-flight Results: The Total Solar Irradiance Monitor on the FY-3C Satellite, an Instrument with a Pointing System

    NASA Astrophysics Data System (ADS)

    Wang, Hongrui; Qi, Jin; Li, Huiduan; Fang, Wei

    2017-01-01

    The total solar irradiance (TSI) has been recorded daily since October 2013 by the Total Solar Irradiance Monitor (TSIM) onboard the FY-3C satellite, which is mainly designed for Earth observation. The TSIM has a pointing system to perform solar tracking using a sun sensor. The TSI is measured by two electrical substitution radiometers with traceability to the World Radiation Reference. The TSI value measured with the TSIM on 2 October 2013 is 1364.88 W m^{-2} with an uncertainty of 1.08 W m^{-2}. Short-term TSI variations recorded with the TSIM show good agreement with SOHO/VIRGO and SORCE/TIM. The data quality and accuracy of FY-3C/TSIM are much better than its predecessors on the FY-3A and FY-3B satellites, which operated in a scanning mode.

  12. 34 CFR 303.167 - Individualized family service plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true Individualized family service plans. 303.167 Section 303... Requirements § 303.167 Individualized family service plans. Each application must include— (a) An assurance that a current IFSP is in effect and implemented for each eligible child and the child's family; (b...

  13. 40 CFR 49.10887 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10887 Section 49.10887 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Stillaguamish Tribe of Washington § 49.10887 EPA-approved...

  14. 30 CFR 46.3 - Training plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Training plans. 46.3 Section 46.3 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR EDUCATION AND TRAINING TRAINING AND..., COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.3 Training plans. (a) You must develop and implement a...

  15. 34 CFR 303.167 - Individualized family service plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false Individualized family service plans. 303.167 Section...-Application Requirements § 303.167 Individualized family service plans. Each application must include— (a) An assurance that a current IFSP is in effect and implemented for each eligible child and the child's family...

  16. 40 CFR 52.58 - Control strategy: Lead.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Control strategy: Lead. 52.58 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.58 Control strategy: Lead. The lead plan... the lead standard throughout Alabama. The lead plan submitted by the State on October 7, 1985, and...

  17. 40 CFR 52.58 - Control strategy: Lead.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control strategy: Lead. 52.58 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.58 Control strategy: Lead. The lead plan... the lead standard throughout Alabama. The lead plan submitted by the State on October 7, 1985, and...

  18. 40 CFR 52.58 - Control strategy: Lead.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Control strategy: Lead. 52.58 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.58 Control strategy: Lead. The lead plan... the lead standard throughout Alabama. The lead plan submitted by the State on October 7, 1985, and...

  19. 40 CFR 52.58 - Control strategy: Lead.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control strategy: Lead. 52.58 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.58 Control strategy: Lead. The lead plan... the lead standard throughout Alabama. The lead plan submitted by the State on October 7, 1985, and...

  20. 40 CFR 52.58 - Control strategy: Lead.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategy: Lead. 52.58 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.58 Control strategy: Lead. The lead plan... the lead standard throughout Alabama. The lead plan submitted by the State on October 7, 1985, and...

  1. Causes of Student Attrition in US Naval Aviation Training: A Five Year Review from FY 2003 to FY 2007

    DTIC Science & Technology

    2008-08-28

    Stitcher -Singleton for providing access to Naval Aviation Student Training Attrition Report archives and for assistance in obtaining related training...2006 period ( Stitcher -Singleton, 2006a) 06-2 for April 2006 to September 2006 period ( Stitcher -Singleton, 2006b) 07-1 for October 2006 to March 2007...period ( Stitcher -Singleton, 2007a) 07-2 for April 2007 to September 2007 period ( Stitcher -Singleton, 2007b) CNATRAINST 1500.4D directs administration

  2. Investing in the Future: Strategic Planning, FY 2001 Appropriations Requests, Supplemental & Statistical Information.

    ERIC Educational Resources Information Center

    Iowa State Board of Regents, Des Moines.

    This document presents the State of Iowa Board of Regents fiscal year (FY) 2001 budget requests and provides information about the Board and its institutions. An introductory section 1 offers an overview of the Board of Regents' functions, including a mission state and governance process, and explains FY 2000 appropriation reductions and FY 2001…

  3. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  4. IDF Sagebrush Habitat Mitigation Project: FY2008 Compensation Area Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durham, Robin E.; Sackschewsky, Michael R.

    This document provides a review and status of activities conducted in support of the CH2MHill Hanford Group (CHG) Compensatory Mitigation Implementation Plan (MIP) for the Integrated Disposal Facility (IDF). It includes time-zero monitoring results for planting activities conducted in December 2007, annual survival monitoring for all planting years, a summary of artificial burrow observations, and recommendations for the successful completion of DOE mitigation commitments for this project.

  5. Fiscal year 1980-81 implementation plan in support of technical development and integration of sampling and aggregation procedures. [crop acreage estimation

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The specific objectives of the FY 1980-81 tasks are: (1) further refinements to the weighted aggregation procedure; (2) improved approaches for estimating within-stratum variance; (3) more intensive investigation of alternative sampling strategies such as full-frame sampling strategy, and (4) further developments in regard to a simulated approach for assessing the performance of the overall designed sampling and aggregation system.

  6. 78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...

  7. 75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-29

    ... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear Facilities Safety Board is soliciting comments from all interested and potentially...

  8. Annual Report 1984.

    DTIC Science & Technology

    1985-01-01

    equipped with data collection platforms (DCP) by the end of FY 1985. (b) Communication. The DCP’s transmit the remote gaging station data over the...activated 78 platforms in FY 84 bringing the total number of operating stations to 85. Plans are to activate seven more platforms in FY 85. c. Acoustic... Platforms . The total program cost for FY 1984 is shown in Table VI-3. The total program cost for FY 1985 will be $172,720. (2) National Weather Service

  9. Fiscal Year 2007 Program Performance Plan

    ERIC Educational Resources Information Center

    US Department of Education, 2006

    2006-01-01

    The strategic goals and objectives set forth in the Department of Education's "FY (Fiscal Year) 2002-2007 Strategic Plan" form the context for the broad outcomes that the Department believes should characterize American education. The Department administers more than 150 programs in support of these goals and objectives. This "FY 2007 Program…

  10. Loads and aeroelasticity division research and technology accomplishments for FY 1982 and plans for FY 1983

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.

    1983-01-01

    Accomplishments of the past year and plans for the coming year are highlighted as they relate to five year plans and the objectives of the following technical areas: aerothermal loads; multidisciplinary analysis and optimization; unsteady aerodynamics; and configuration aeroelasticity. Areas of interest include thermal protection system concepts, active control, nonlinear aeroelastic analysis, aircraft aeroelasticity, and rotorcraft aeroelasticity and vibrations.

  11. Integrated Defensive Electronic Countermeasures (IDECM)

    DTIC Science & Technology

    2015-12-01

    Selected Acquisition Report ( SAR ) RCS: DD-A&T(Q&A)823-418 Integrated Defensive Electronic Countermeasures (IDECM) As of FY 2017 President’s Budget...Defense Acquisition Management Information Retrieval (DAMIR) March 10, 2016 08:58:42 UNCLASSIFIED IDECM December 2015 SAR March 10, 2016 08:58:42... SAR March 10, 2016 08:58:42 UNCLASSIFIED 3 PB - President’s Budget PE - Program Element PEO - Program Executive Officer PM - Program Manager POE

  12. Quality-Assurance Plan for Water-Quality Activities of the U.S. Geological Survey in Miami, Florida

    DTIC Science & Technology

    2003-01-01

    Jacqueline Lima GS-12 GS-10 GS-09 GS-09 GS-08 GS-07 GS-06 GS-06 GS-04 GS-04Eleanor Seymore Surface-Water Data Collections & Jon Woolverton Jorge Agis...Thomas J. Smith, III Gordon Anderson Kevin Whelan Don De Angelis Allison Snow GS-13 GS-07 GS-05 GS-12 GS-13 GS-07 GS-12 GS-13 GS-09 GS-07 GS-14 GS-07...fan, active, inactive, inventory only playa , month day year stream channel, digital rec- order, North American Datum of 1927 North American Datum of

  13. Integrated modeling of advanced optical systems

    NASA Astrophysics Data System (ADS)

    Briggs, Hugh C.; Needels, Laura; Levine, B. Martin

    1993-02-01

    This poster session paper describes an integrated modeling and analysis capability being developed at JPL under funding provided by the JPL Director's Discretionary Fund and the JPL Control/Structure Interaction Program (CSI). The posters briefly summarize the program capabilities and illustrate them with an example problem. The computer programs developed under this effort will provide an unprecedented capability for integrated modeling and design of high performance optical spacecraft. The engineering disciplines supported include structural dynamics, controls, optics and thermodynamics. Such tools are needed in order to evaluate the end-to-end system performance of spacecraft such as OSI, POINTS, and SMMM. This paper illustrates the proof-of-concept tools that have been developed to establish the technology requirements and demonstrate the new features of integrated modeling and design. The current program also includes implementation of a prototype tool based upon the CAESY environment being developed under the NASA Guidance and Control Research and Technology Computational Controls Program. This prototype will be available late in FY-92. The development plan proposes a major software production effort to fabricate, deliver, support and maintain a national-class tool from FY-93 through FY-95.

  14. 40 CFR 49.10167 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10167 Section 49.10167 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10167 EPA...

  15. 40 CFR 49.10227 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10227 Section 49.10227 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Klamath Indian Tribe of Oregon § 49.10227 EPA-approved Tribal...

  16. 40 CFR 49.10257 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10257 Section 49.10257 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10257 EPA-approved Tribal rules...

  17. 40 CFR 49.10467 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10467 Section 49.10467 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Nooksack Indian Tribe of Washington § 49.10467 EPA-approved...

  18. 40 CFR 49.10047 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10047 Section 49.10047 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10047 EPA...

  19. 40 CFR 49.10407 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10407 Section 49.10407 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Nez Perce Tribe of Idaho § 49.10407 EPA-approved Tribal rules...

  20. 40 CFR 49.10647 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10647 Section 49.10647 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Sauk-Suiattle Indian Tribe of Washington § 49.10647 EPA...

  1. 40 CFR 49.11047 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.11047 Section 49.11047 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Upper Skagit Indian Tribe of Washington § 49.11047 EPA...

  2. 40 CFR 49.10017 - EPA-approved Tribal rules and plans. [Reserved

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false EPA-approved Tribal rules and plans. [Reserved] 49.10017 Section 49.10017 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND... Tribes-Region X Implementation Plan for the Coquille Tribe of Oregon § 49.10017 EPA-approved Tribal rules...

  3. 29 CFR 1918.100 - Emergency action plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency action or for reaction time for safe escape of employees from the workplace or the immediate work... 29 Labor 7 2010-07-01 2010-07-01 false Emergency action plans. 1918.100 Section 1918.100 Labor... action plans. (a) Scope and application. This section requires all employers to develop and implement an...

  4. FY2007 Laboratory Directed Research and Development Annual Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Craig, W W; Sketchley, J A; Kotta, P R

    The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2007 (FY07) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: An introduction to the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY07, and a list of publications that resulted frommore » the research in FY07. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.« less

  5. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Definitions. 49.152 Section 49.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  6. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Definitions. 49.152 Section 49.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  7. 40 CFR 49.152 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Definitions. 49.152 Section 49.152 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT General Federal Implementation Plan Provisions Federal Minor New...

  8. Confederated Tribes Umatilla Indian Reservation (CTUIR) Umatilla Anadromous Fisheries Habitat Project : A Columbia River Basin Fish Habitat Project : Annual Report Fiscal Year 2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoverson, Eric D.; Amonette, Alexandra

    2008-12-02

    The Umatilla Anadromous Fisheries Habitat Project (UAFHP) is an ongoing effort to protect, enhance, and restore riparian and instream habitat for the natural production of anadromous salmonids in the Umatilla River Basin, Northeast Oregon. Flow quantity, water temperature, passage, and lack of in-stream channel complexity have been identified as the key limiting factors in the basin. During the 2007 Fiscal Year (FY) reporting period (February 1, 2007-January 31, 2008) primary project activities focused on improving instream and riparian habitat complexity, migrational passage, and restoring natural channel morphology and floodplain function. Eight fisheries habitat enhancement projects were implemented on Meacham Creek,more » Camp Creek, Greasewood Creek, Birch Creek, West Birch Creek, and the Umatilla River. Specific restoration actions included: (1) rectifying five fish passage barriers on four creeks, (2) planting 1,275 saplings and seeding 130 pounds of native grasses, (3) constructing two miles of riparian fencing for livestock exclusion, (4) coordinating activities related to the installation of two off-channel, solar-powered watering areas for livestock, and (5) developing eight water gap access sites to reduce impacts from livestock. Baseline and ongoing monitoring and evaluation activities were also completed on major project areas such as conducting photo point monitoring strategies activities at the Meacham Creek Large Wood Implementation Project site (FY2006) and at all existing easements and planned project sites. Fish surveys and aquatic habitat inventories were conducted at project sites prior to implementation. Monitoring plans will continue throughout the life of each project to oversee progression and inspire timely managerial actions. Twenty-seven conservation easements were maintained with 23 landowners. Permitting applications for planned project activities and biological opinions were written and approved. Project activities were based on a variety of fisheries monitoring techniques and habitat assessments used to determine existing conditions and identify factors limiting anadromous salmonid abundance. Proper selection and implementation of the most effective site-specific habitat restoration plan, taking into consideration the unique characteristics of each project site, and conducted in cooperation with landowners and project partners, was of paramount importance to ensure each project's success.« less

  9. Fiscal Year (FY) 2001 Budget Estimates. Army National Guard. Military Construction Program FY 2001. Justification Data Submission to Congress. Department of the Army.

    DTIC Science & Technology

    2000-02-01

    CONSIDERATIONS ix-xx FUTURE YEARS DEFENSE PLAN AUDIT TRAIL xxi-xxiii PROJECT JUSTIFICATION DOCUMENTS 1-149 PLANNING & DESIGN JUSTIFICATION DOCUMENT 15 0...OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DDl°™1390s2 MAY 78 1. COMPONENT FY 2001 GUARD AND RESERVE 2. DATE ARNG MILITARY CONSTRUCTION FEB00 3...TOTAL 36 286 13 MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ASSIGNED 14. OUTSTANDING POLUTION AND SAFETY DEFICIENCIES: DD:A O™1390S2 1

  10. Exploratory Research on Personnel Long Range Planning

    DTIC Science & Technology

    1982-05-01

    rN4 and Joyce ShieldsI AR I ’I.0 04E~i Reserch nsttuteforU. S., Army K-Z Reearh Istiuteforthe Behavioral and Social Sciences May 1982 4S () 9 2~s.? 001...should be included in a personnel long ,ang plan (PLRP), DD , 0711W03 mno EOF@ 9 Nov sois@oneum UNCLASSIFIED SECURITY CLASSIFICATION OF TNIS PAE9 (ftaft...Accessions 3-16 3-7 FY1998 Distribution of Non-Prior-Service Accessions 3-17 3-8 FY1988 Distribution of Non-Prior-Service Accessions 3-18 * 3- 9 FY1989

  11. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... Register on February 28, 2012 and concern glass furnaces and biomass boilers. We are approving local rules... MDAQMD 1165 Glass Melting Furnaces......... 08/12/08 12/23/08 YSAQMD 2.43 Biomass Boilers 11/10/10 04/05.... * * * * * (388) * * * (i) * * * (F) Yolo-Solano Air Quality Management District. (1) Rule 2.43, ``Biomass Boilers...

  12. Notification: Audit of EPA's Implementation of the Cross-Media Electronic Reporting Regulation (CROMERR)

    EPA Pesticide Factsheets

    Project #OMS-FY11-0006 and #OMS-FY12-0004, January 26, 2012. On February 7, 2011 the EPA's OIG began preliminary research on the audit of EPA’s Implementation of the Cross-Media Electronic Reporting Regulation (CROMERR).

  13. U.S. Department of Education FY 2009 Annual Performance Report

    ERIC Educational Resources Information Center

    US Department of Education, 2010

    2010-01-01

    The United States Department of Education's "Annual Performance Report" (APR) for fiscal year (FY) 2009 provides detailed information on how the outcomes of the strategic performance measures identified in its "FY 2007-2012 Strategic Plan" and updated in the "Fiscal Year 2008 Performance and Accountability Report"…

  14. Notification: Background Investigation Services Audits of EPA’s Fiscal Year 2015 FIFRA and PRIA Financial Statements

    EPA Pesticide Factsheets

    Projects #OA-FY16-0080 and #OA-FY16-0079, February 8, 2016. EPA OIG plan to begin audits of the EPA's fiscal year (FY) 2015 financial statements for the Pesticides Reregistration and Expedited Processing Fund (FIFRA) and Pesticide Registration Fund (PRIA).

  15. Development Achievements for Fiscal 1990.

    ERIC Educational Resources Information Center

    Smoot, Joseph G.

    This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…

  16. Design and Implementation of Decoy Enhanced Dynamic Virtualization Networks

    DTIC Science & Technology

    2016-12-12

    From - To) 12/12/2016 Final 07/01/2015-08/31/2016 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Design and Implementation of Decoy Enhanced Dynamic...TELEPHONE NUMBER (Include area code) 703-993-1715 Standard Form 298 (Rev . 8/98) Prescribed by ANSI Std . Z39.18 " Design and Implementation of...8 2 Design and Implementation ofDecoy Enhanced Dynamic Virtualization Networks 1 Major Goals The relatively static configurations of networks and

  17. Department of Defense Performance and Accountability Report, Fiscal Year 2006

    DTIC Science & Technology

    2006-11-15

    FY 2006 with a total of 35, resulting in a net gain of one material weakness over FY 2005. Each weakness and their corrective action plans are...held due to statutory requirements for use in national defense, conservation, or national emergencies. The Annual Materials Plan lists the maximum...of non- materiality instances where planning for periods of crisis were not fully developed. (Office of the Under Secretary of Defense

  18. Air Quality Conformity Determination Of the Constrained Long Range Plan And The FY99-2004 Transportation Improvement Program For The Washington Metropolitan Region

    DOT National Transportation Integrated Search

    1998-07-15

    This report documents the assessment of the Constrained Long Range Plan (CLRP) and the FY99-2004 Transportation Improvement Program (TIP) with respect to air quality conformity requirements under the 1990 Clean Air Act Amendments. The assessment used...

  19. Land Information System (LIS) Development Plan: FY13-FY17

    DTIC Science & Technology

    2013-10-01

    NE 68113 ERDC/CRREL TN-13-2 ii Abstract In 2007, the Air Force Weather Agency (AFWA) approved a plan, collabo- rative with NASA Goddard Space...18 4.1.2 AFWA sponsored research and development at NASA ........................................... 21 4.1.3...26 4.2.2 AFWA funded R&D at NASA

  20. Verification and Validation of a Navy ESPC Hindcast with Loosely Coupled Data Assimilation

    NASA Astrophysics Data System (ADS)

    Metzger, E. J.; Barton, N. P.; Smedstad, O. M.; Ruston, B. C.; Wallcraft, A. J.; Whitcomb, T. R.; Ridout, J. A.; Franklin, D. S.; Zamudio, L.; Posey, P. G.; Reynolds, C. A.; Phelps, M.

    2016-12-01

    The US Navy is developing an Earth System Prediction Capability (ESPC) to provide global environmental information to meet Navy and Department of Defense (DoD) operations and planning needs from the upper atmosphere to under the sea. It will be a fully coupled global atmosphere/ocean/ice/wave/land prediction system providing daily deterministic forecasts out to 16 days at high horizontal and vertical resolution, and daily probabilistic forecasts out to 45 days at lower resolution. The system will run at the Navy DoD Supercomputing Resource Center with an initial operational capability scheduled for the end of FY18 and the final operational capability scheduled for FY22. The individual model and data assimilation components include: atmosphere - NAVy Global Environmental Model (NAVGEM) and Naval Research Laboratory (NRL) Atmospheric Variational Data Assimilation System - Accelerated Representer (NAVDAS-AR); ocean - HYbrid Coordinate Ocean Model (HYCOM) and Navy Coupled Ocean Data Assimilation (NCODA); ice - Community Ice CodE (CICE) and NCODA; WAVEWATCH III™ and NCODA; and land - NAVGEM Land Surface Model (LSM). Currently, NAVGEM/HYCOM/CICE are three-way coupled and each model component is cycling with its respective assimilation scheme. The assimilation systems do not communicate with each other, but future plans call for these to be coupled as well. NAVGEM runs with a 6-hour update cycle while HYCOM/CICE run with a 24-hour update cycle. The T359L50 NAVGEM/0.08° HYCOM/0.08° CICE system has been integrated in hindcast mode and verification/validation metrics have been computed against unassimilated observations and against stand-alone versions of NAVGEM and HYCOM/CICE. This presentation will focus on typical operational diagnostics for atmosphere, ocean, and ice analyses including 500 hPa atmospheric height anomalies, low-level winds, temperature/salinity ocean depth profiles, ocean acoustical proxies, sea ice edge, and sea ice drift. Overall, the global coupled ESPC system is performing with comparable skill to the stand-alone systems at the nowcast time.

  1. 40 CFR 52.533 - Source surveillance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Source surveillance. 52.533 Section 52.533 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.533 Source surveillance. The plan lacks test...

  2. 40 CFR 52.533 - Source surveillance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Source surveillance. 52.533 Section 52.533 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.533 Source surveillance. The plan lacks test...

  3. 40 CFR 52.533 - Source surveillance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Source surveillance. 52.533 Section 52.533 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.533 Source surveillance. The plan lacks test...

  4. 40 CFR 52.533 - Source surveillance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Source surveillance. 52.533 Section 52.533 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.533 Source surveillance. The plan lacks test...

  5. 40 CFR 52.533 - Source surveillance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Source surveillance. 52.533 Section 52.533 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.533 Source surveillance. The plan lacks test...

  6. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  7. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  8. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  9. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  10. 40 CFR 52.2589 - Wisconsin construction permit permanency revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Wisconsin construction permit... (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2589 Wisconsin construction permit permanency revision. This plan was originally submitted as Wis...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farren Hunt

    Idaho National Laboratory (INL) performed an Annual Effectiveness Review of the Integrated Safety Management System (ISMS), per 48 Code of Federal Regulations (CFR) 970.5223 1, “Integration of Environment, Safety and Health into Work Planning and Execution.” The annual review assessed Integrated Safety Management (ISM) effectiveness, provided feedback to maintain system integrity, and identified target areas for focused improvements and assessments for fiscal year (FY) 2013. Results of the FY 2012 annual effectiveness review demonstrated that the INL’s ISMS program was significantly strengthened. Actions implemented by the INL demonstrate that the overall Integrated Safety Management System is sound and ensures safemore » and successful performance of work while protecting workers, the public, and environment. This report also provides several opportunities for improvement that will help further strengthen the ISM Program and the pursuit of safety excellence. Demonstrated leadership and commitment, continued surveillance, and dedicated resources have been instrumental in maturing a sound ISMS program. Based upon interviews with personnel, reviews of assurance activities, and analysis of ISMS process implementation, this effectiveness review concludes that ISM is institutionalized and is “Effective”.« less

  12. 40 CFR 52.07 - Control strategies.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control strategies. 52.07 Section 52.07... PROMULGATION OF IMPLEMENTATION PLANS General Provisions § 52.07 Control strategies. (a) Each subpart specifies in what respects the control strategies are approved or disapproved. Where emission limitations with...

  13. 40 CFR 52.07 - Control strategies.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Control strategies. 52.07 Section 52.07... PROMULGATION OF IMPLEMENTATION PLANS General Provisions § 52.07 Control strategies. (a) Each subpart specifies in what respects the control strategies are approved or disapproved. Where emission limitations with...

  14. 40 CFR 52.07 - Control strategies.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Control strategies. 52.07 Section 52.07... PROMULGATION OF IMPLEMENTATION PLANS General Provisions § 52.07 Control strategies. (a) Each subpart specifies in what respects the control strategies are approved or disapproved. Where emission limitations with...

  15. 40 CFR 52.07 - Control strategies.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Control strategies. 52.07 Section 52.07... PROMULGATION OF IMPLEMENTATION PLANS General Provisions § 52.07 Control strategies. (a) Each subpart specifies in what respects the control strategies are approved or disapproved. Where emission limitations with...

  16. 40 CFR 52.07 - Control strategies.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control strategies. 52.07 Section 52.07... PROMULGATION OF IMPLEMENTATION PLANS General Provisions § 52.07 Control strategies. (a) Each subpart specifies in what respects the control strategies are approved or disapproved. Where emission limitations with...

  17. 75 FR 64953 - Approval and Promulgation of Implementation Plans; State of Missouri

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R07-OAR-2010-0415; FRL-9210-3] Approval and Promulgation of Implementation Plans; State of Missouri AGENCY: Environmental Protection Agency (EPA). [email protected] . 3. Mail or Hand Delivery: Lachala Kemp, Environmental Protection Agency, Air Planning...

  18. 30 CFR 254.23 - What information must I include in the “Emergency response action plan” section?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Your methods to implement your dispersant use plan and your in situ burning plan. ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What information must I include in the â... must I include in the “Emergency response action plan” section? The “Emergency response action plan...

  19. Transition projects, Fiscal Year 1996: Multi-Year Program Plan (MYPP) for WBS 1.31, 7.1, and 6.13. Revision 1, Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cartmell, D.B.

    1995-09-01

    Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less

  20. 40 CFR 52.171 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Classification of regions. 52.171... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arkansas § 52.171 Classification of regions. The Arkansas plan was evaluated on the basis of the following classifications: Air quality control...

  1. 40 CFR 52.121 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Classification of regions. 52.121... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.121 Classification of regions. The Arizona plan is evaluated on the basis of the following classifications: AQCR (constituent counties...

  2. 40 CFR 52.121 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Classification of regions. 52.121... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.121 Classification of regions. The Arizona plan is evaluated on the basis of the following classifications: AQCR (constituent counties...

  3. 40 CFR 52.1421 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1421 Classification of regions. The Nebraska plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1421...

  4. 40 CFR 52.2571 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2571 Classification of regions. The Wisconsin plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2571...

  5. 40 CFR 52.1921 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1921 Classification of regions. The Oklahoma plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1921...

  6. 40 CFR 52.1221 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1221 Classification of regions. The Minnesota plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1221...

  7. 40 CFR 52.1921 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1921 Classification of regions. The Oklahoma plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1921...

  8. 40 CFR 52.1171 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Michigan § 52.1171 Classification of regions. The Michigan plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1171...

  9. 40 CFR 52.921 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.921 Classification of regions. The Kentucky plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.921...

  10. 40 CFR 52.371 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.371 Classification of regions. The Connecticut plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.371...

  11. 40 CFR 52.1171 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Michigan § 52.1171 Classification of regions. The Michigan plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1171...

  12. 40 CFR 52.971 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Louisiana § 52.971 Classification of regions. The Louisiana plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.971...

  13. 40 CFR 52.1071 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1071 Classification of regions. The Maryland plans were evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1071...

  14. 40 CFR 52.2571 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2571 Classification of regions. The Wisconsin plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2571...

  15. 40 CFR 52.221 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.221 Classification of regions. The California plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.221...

  16. 40 CFR 52.971 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Louisiana § 52.971 Classification of regions. The Louisiana plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.971...

  17. 40 CFR 52.2221 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2221 Classification of regions. The Tennessee plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2221...

  18. 40 CFR 52.221 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.221 Classification of regions. The California plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.221...

  19. 40 CFR 52.171 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arkansas § 52.171 Classification of regions. The Arkansas plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.171...

  20. 40 CFR 52.1071 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Maryland § 52.1071 Classification of regions. The Maryland plans were evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1071...

  1. 40 CFR 52.921 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.921 Classification of regions. The Kentucky plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.921...

  2. 40 CFR 52.2221 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Tennessee § 52.2221 Classification of regions. The Tennessee plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2221...

  3. 40 CFR 52.571 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia> § 52.571 Classification of regions. The Georgia plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.571...

  4. 40 CFR 52.1221 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1221 Classification of regions. The Minnesota plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1221...

  5. 40 CFR 52.371 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Connecticut § 52.371 Classification of regions. The Connecticut plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.371...

  6. 40 CFR 52.1321 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1321 Classification of regions. The Missouri plans were evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1321...

  7. 40 CFR 52.571 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Georgia> § 52.571 Classification of regions. The Georgia plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.571...

  8. 40 CFR 52.2421 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2421 Classification of regions. The Virginia plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2421...

  9. 40 CFR 52.171 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arkansas § 52.171 Classification of regions. The Arkansas plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.171...

  10. 40 CFR 52.421 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.421 Classification of regions. The Delaware plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.421...

  11. 40 CFR 52.1321 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Missouri § 52.1321 Classification of regions. The Missouri plans were evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1321...

  12. 40 CFR 52.2421 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Virginia § 52.2421 Classification of regions. The Virginia plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2421...

  13. 40 CFR 52.421 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Delaware § 52.421 Classification of regions. The Delaware plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.421...

  14. 40 CFR 52.1421 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1421 Classification of regions. The Nebraska plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1421...

  15. 40 CFR 52.1425 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1425 Section...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nebraska § 52.1425 Compliance schedules. (a) The compliance schedules for the sources identified below are approved as revisions to the plan...

  16. Loads and Aeroelasticity Division research and technology accomplishments for FY 1984 and plans for FY 1985

    NASA Technical Reports Server (NTRS)

    Gardner, J. E.; Dixon, S. C.

    1985-01-01

    The loads and aeroelasticity divisions research accomplishments are presented. The work under each branch or technical area, described in terms of highlights of accomplishments during the past year and highlights of plans for the current year as they relate to 5 year plans for each technical area. This information will be useful in program coordination with other government organizations and industry in areas of mutual interest.

  17. U.S. Department of Education FY 2010 Annual Performance Report

    ERIC Educational Resources Information Center

    US Department of Education, 2011

    2011-01-01

    This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Annual Performance Report" (APR). This report provides detailed information on: (1) the status of strategic goals, and (2) the outcomes of the strategic performance measures identified in the Department's "FY 2007-2012 Strategic Plan" and updated previously in the "FY…

  18. Cascade Distillation Subsystem Development: Progress Toward a Distillation Comparison Test

    NASA Technical Reports Server (NTRS)

    Callahan, M. R.; Lubman, A.; Pickering, Karen D.

    2009-01-01

    Recovery of potable water from wastewater is essential for the success of long-duration manned missions to the Moon and Mars. Honeywell International and a team from NASA Johnson Space Center (JSC) are developing a wastewater processing subsystem that is based on centrifugal vacuum distillation. The wastewater processor, referred to as the Cascade Distillation Subsystem (CDS), utilizes an innovative and efficient multistage thermodynamic process to produce purified water. The rotary centrifugal design of the system also provides gas/liquid phase separation and liquid transport under microgravity conditions. A five-stage subsystem unit has been designed, built, delivered and integrated into the NASA JSC Advanced Water Recovery Systems Development Facility for performance testing. A major test objective of the project is to demonstrate the advancement of the CDS technology from the breadboard level to a subsystem level unit. An initial round of CDS performance testing was completed in fiscal year (FY) 2008. Based on FY08 testing, the system is now in development to support an Exploration Life Support (ELS) Project distillation comparison test expected to begin in early 2009. As part of the project objectives planned for FY09, the system will be reconfigured to support the ELS comparison test. The CDS will then be challenged with a series of human-gene-rated waste streams representative of those anticipated for a lunar outpost. This paper provides a description of the CDS technology, a status of the current project activities, and data on the system s performance to date.

  19. Medicare program; FY 2014 hospice wage index and payment rate update; hospice quality reporting requirements; and updates on payment reform. final rule.

    PubMed

    2013-08-07

    This final rule updates the hospice payment rates and the wage index for fiscal year (FY) 2014, and continues the phase out of the wage index budget neutrality adjustment factor (BNAF). Including the FY 2014 15 percent BNAF reduction, the total 5 year cumulative BNAF reduction in FY 2014 will be 70 percent. The BNAF phase-out will continue with successive 15 percent reductions in FY 2015 and FY 2016. This final rule also clarifies how hospices are to report diagnoses on hospice claims, and provides updates to the public on hospice payment reform. Additionally, this final rule changes the requirements for the hospice quality reporting program by discontinuing currently reported measures and implementing a Hospice Item Set with seven National Quality Forum (NFQ) endorsed measures beginning July 1, 2014, as proposed. Finally, this final rule will implement the hospice Experience of Care Survey on January 1, 2015, as proposed.

  20. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... furnaces and biomass boilers. We are approving local rules that regulate these emission sources under the.... Rule title Amended Submitted MDAQMD 1165 Glass Melting 08/12/08 12/23/08 Furnaces. YSAQMD 2.43 Biomass... emissions of NO X and CO from boilers that use biomass as fuel and that have a heat input rating of greater...

  1. 78 FR 21959 - Extension of Public Comment Period for Request for Information on the FY 2013-2018 Strategic Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Period for Request for Information on the FY 2013-2018 Strategic Plan for the Office of Disease Prevention SUMMARY: The Office of Disease Prevention (ODP), National Institutes of Health (NIH), is amending..., Office of Disease Prevention, National Institutes of Health; phone, 301-496-1508; email, [email protected

  2. 40 CFR 52.65 - Control Strategy: Nitrogen oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Control Strategy: Nitrogen oxides. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.65 Control Strategy: Nitrogen... using to implement provisions of the Prevention of Significant Deterioration regulations for nitrogen...

  3. 40 CFR 52.65 - Control Strategy: Nitrogen oxides.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Control Strategy: Nitrogen oxides. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.65 Control Strategy: Nitrogen... using to implement provisions of the Prevention of Significant Deterioration regulations for nitrogen...

  4. 40 CFR 52.65 - Control Strategy: Nitrogen oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Control Strategy: Nitrogen oxides. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.65 Control Strategy: Nitrogen... using to implement provisions of the Prevention of Significant Deterioration regulations for nitrogen...

  5. 40 CFR 52.65 - Control Strategy: Nitrogen oxides.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Control Strategy: Nitrogen oxides. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.65 Control Strategy: Nitrogen... using to implement provisions of the Prevention of Significant Deterioration regulations for nitrogen...

  6. 40 CFR 52.2307 - Small business assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2307 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  7. 40 CFR 52.1935 - Small business assistance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  8. 40 CFR 52.1935 - Small business assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  9. 40 CFR 52.2307 - Small business assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 5 2013-07-01 2013-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2307 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  10. 40 CFR 52.1935 - Small business assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  11. 40 CFR 52.2307 - Small business assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 5 2012-07-01 2012-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2307 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  12. 40 CFR 52.2307 - Small business assistance program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 5 2014-07-01 2014-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2307 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  13. 40 CFR 52.1935 - Small business assistance program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  14. 40 CFR 52.2307 - Small business assistance program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2307 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  15. 40 CFR 52.1935 - Small business assistance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Small business assistance program. 52... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oklahoma § 52.1935 Small business... implement a Small Business Stationary Source Technical and Environmental Compliance Assistance Program to...

  16. Moses Lake Fishery Restoration Project : FY 1999 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None given

    2000-12-01

    The Moses Lake Project consists of 3 phases. Phase 1 is the assessment of all currently available physical and biological information, the collection of baseline biological data, the formulation of testable hypotheses, and the development of a detailed study plan to test the hypotheses. Phase 2 is dedicated to the implementation of the study plan including data collection, hypotheses testing, and the formulation of a management plan. Phase 3 of the project is the implementation of the management plan, monitoring and evaluation of the implemented recommendations. The project intends to restore the failed recreational fishery for panfish species (black crappie,more » bluegill and yellow perch) in Moses Lake as off site mitigation for lost recreational fishing opportunities for anadromous species in the upper Columbia River. This report summarizes the results of Phase 1 investigations and presents the study plan directed at initiating Phase 2 of the project. Phase 1of the project culminates with the formulation of testable hypotheses directed at investigating possible limiting factors to the production of panfish in Moses Lake. The limiting factors to be investigated will include water quality, habitat quantity and quality, food limitations, competition, recruitment, predation, over harvest, environmental requirements, and the physical and chemical limitations of the system in relation to the fishes.« less

  17. 76 FR 61057 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... compound (VOC) emissions from organic chemical manufacturing, soil decontamination, and polyester resin... 74.29 Soil Decontamination Operations 04/08/08 01/10/10 PCAPCD 243 Polyester Resin Operations..... 04....29 establishes procedures for the treatment of soil contaminated with gasoline, diesel fuel or jet...

  18. 40 CFR 256.42 - Recommendations for assuring facility development.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Recommendations for assuring facility development. 256.42 Section 256.42 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan...

  19. 33 CFR 385.19 - Environmental and economic equity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...

  20. 40 CFR 52.71 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Classification of regions. 52.71... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.71 Classification of regions. The Alaska plan was evaluated on the basis of the following classifications: Air quality control Region...

  1. 40 CFR 52.51 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Classification of regions. 52.51... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.51 Classification of regions. The Alabama plan was evaluated on the basis of the following classifications: Air quality control region...

  2. 40 CFR 52.71 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Classification of regions. 52.71... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.71 Classification of regions. The Alaska plan was evaluated on the basis of the following classifications: Air quality control Region...

  3. 40 CFR 52.51 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Classification of regions. 52.51... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.51 Classification of regions. The Alabama plan was evaluated on the basis of the following classifications: Air quality control region...

  4. 33 CFR 385.19 - Environmental and economic equity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...

  5. 33 CFR 385.19 - Environmental and economic equity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...

  6. 33 CFR 385.19 - Environmental and economic equity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...

  7. 33 CFR 385.19 - Environmental and economic equity.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Environmental and economic equity... Implementation Processes § 385.19 Environmental and economic equity. (a) Project Management Plans and Program Management Plans shall include information concerning any environmental and economic equity activities to be...

  8. 40 CFR 51.1102 - Classification and nonattainment area planning provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false Classification and nonattainment area planning provisions. 51.1102 Section 51.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Provisions for Implementation of the 2008 Ozone National Ambient Air Quality Standards § 51.1102...

  9. 40 CFR 51.1102 - Classification and nonattainment area planning provisions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false Classification and nonattainment area planning provisions. 51.1102 Section 51.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Provisions for Implementation of the 2008 Ozone National Ambient Air Quality Standards § 51.1102...

  10. 40 CFR 51.1102 - Classification and nonattainment area planning provisions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false Classification and nonattainment area planning provisions. 51.1102 Section 51.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Provisions for Implementation of the 2008 Ozone National Ambient Air Quality Standards § 51.1102...

  11. 40 CFR 52.1471 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1471 Classification of regions. The Nevada plan is evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1471...

  12. 40 CFR 52.1571 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Jersey § 52.1571 Classification of regions. The New Jersey plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1571...

  13. 40 CFR 52.51 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alabama § 52.51 Classification of regions. The Alabama plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.51...

  14. 40 CFR 52.671 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.671 Classification of regions. The Idaho plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.671...

  15. 40 CFR 52.871 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kansas § 52.871 Classification of regions. The Kansas plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.871...

  16. 40 CFR 52.2371 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2371 Classification of regions. The Vermont plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2371...

  17. 40 CFR 52.1971 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1971 Classification of regions. The Oregon plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1971...

  18. 40 CFR 52.671 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.671 Classification of regions. The Idaho plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.671...

  19. 40 CFR 52.2671 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Guam § 52.2671 Classification of regions. The Guam plan was evaluated on the basis of the following classifications. Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2671...

  20. 40 CFR 52.2621 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2621 Classification of regions. The Wyoming plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2621...

  1. 40 CFR 52.821 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.821 Classification of regions. The Iowa plan was evaluated on the basis of the following classification: Air quality control region... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.821...

  2. 40 CFR 52.771 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Indiana § 52.771 Classification of regions. (a) The Indiana plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.771...

  3. 40 CFR 52.2671 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Guam § 52.2671 Classification of regions. The Guam plan was evaluated on the basis of the following classifications. Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2671...

  4. 40 CFR 52.621 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.621 Classification of regions. The Hawaii plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.621...

  5. 40 CFR 52.2321 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2321 Classification of regions. The Utah plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2321...

  6. 40 CFR 52.2321 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Utah § 52.2321 Classification of regions. The Utah plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2321...

  7. 40 CFR 52.1871 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Ohio § 52.1871 Classification of regions. The Ohio plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1871...

  8. 40 CFR 52.1571 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Jersey § 52.1571 Classification of regions. The New Jersey plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1571...

  9. 40 CFR 52.471 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.471 Classification of regions. The District of Columbia plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.471...

  10. 40 CFR 52.2371 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Vermont § 52.2371 Classification of regions. The Vermont plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2371...

  11. 40 CFR 52.2271 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2271 Classification of regions. (a) The Texas plan was evaluated on the basis of the following classifications: Air quality... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.2271...

  12. 40 CFR 52.471 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS District of Columbia § 52.471 Classification of regions. The District of Columbia plan was evaluated on the basis of the following classifications: Air... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.471...

  13. 40 CFR 52.821 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Iowa § 52.821 Classification of regions. The Iowa plan was evaluated on the basis of the following classification: Air quality control region... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.821...

  14. 40 CFR 52.771 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Indiana § 52.771 Classification of regions. (a) The Indiana plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.771...

  15. 40 CFR 52.2621 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wyoming § 52.2621 Classification of regions. The Wyoming plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2621...

  16. 40 CFR 52.521 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.521 Classification of regions. The Florida plan was evaluated on the basis of the following classifications: Air quality control region... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Classification of regions. 52.521...

  17. 40 CFR 52.2271 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Texas § 52.2271 Classification of regions. (a) The Texas plan was evaluated on the basis of the following classifications: Air quality... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.2271...

  18. 40 CFR 52.71 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Alaska § 52.71 Classification of regions. The Alaska plan was evaluated on the basis of the following classifications: Air quality control Region... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Classification of regions. 52.71...

  19. 40 CFR 52.1471 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1471 Classification of regions. The Nevada plan is evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1471...

  20. 40 CFR 52.1971 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1971 Classification of regions. The Oregon plan was evaluated on the basis of the following classifications: Air quality control... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1971...

Top