2004-12-01
Agency, FY 1999-2003 Table 1.1 – Overview of the Types of Information on Federal lab Technology Transfer Collected in the...invention disclosure, patenting, and licensing. Table 1.1 – Overview of the Types of Information on Federal Lab Technology Transfer Collected in...results. In addition, ARS hosts a Textile Manufacturing Symposium and a Cotton Ginning Symposium at gin and textile labs to benefit county extension
Deficiencies in FY 1998 DOD Financial Statements and Progress Toward Improved Financial Reporting
1999-11-26
DEFICIENCIES IN FY 1998 DOD FINANCIAL STATEMENTS AND PROGRESS TOWARD IMPROVED FINANCIAL REPORTING Report No. D-2000-041 November 26, 1999 Office... Financial Reporting (Report No. D-2000-041) We are providing this audit report for information and use. It identifies and summarizes the major...8FI-2025.02) Deficiencies in FY 1998 DoD Financial Statements and Progress Toward Improved Financial Reporting Executive Summary Introduction
2003-03-06
Financial Management March 6, 2003 Office of the Inspector General of the Department of Defense Financial Reporting of Deferred Maintenance...N/A Dates Covered (from... to) - Title and Subtitle Financial Management: Financial Reporting of Deferred Maintenance Information on Navy Weapon...Project No. D2001FJ-0156.000) Financial Reporting of Deferred Maintenance Information on Navy Weapon Systems for FY 2002 Executive Summary Who
Accelerated testing for studying pavement design and performance (FY 2003) : research summary.
DOT National Transportation Integrated Search
2008-01-01
The Midwest States Accelerated Pavement Testing Pooled Fund Program, financed by : the highway departments of Missouri, Iowa, Kansas and Nebraska, has supported an : accelerated pavement testing (APT) project to compare the performance of stabilized ...
Enhanced surveillance program FY97 accomplishments. Progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mauzy, A.; Laake, B.
1997-10-01
This annual report is one volume of the Enhanced Surveillance Program (ESP) FY97 Accomplishments. The complete accomplishments report consists of 11 volumes. Volume 1 includes an ESP overview and a summary of selected unclassified FY97 program highlights. Volume 1 specifically targets a general audience, reflecting about half of the tasks conducted in FY97 and emphasizing key program accomplishments and contributions. The remaining volumes of the accomplishments report are classified, organized by program focus area, and present in technical detail the progress achieved in each of the 104 FY97 program tasks. Focus areas are as follows: pits; high explosives; organics; dynamics;more » diagnostics; systems; secondaries; nonnuclear materials; nonnuclear components; and Surveillance Test Program upgrades.« less
Research administration, state planning & research part II program : FY2012 at-a-glance.
DOT National Transportation Integrated Search
2012-01-01
This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year (FY) 2012. The tables on pages 2 through 7 list all MDOT-funded research projects by focus area that were active or completed during 2...
Research administration, state planning & research part II program : FY2013 at-a-glance.
DOT National Transportation Integrated Search
2014-01-01
This publication presents a summary of Research and Library funding statistics and project progress for Fiscal Year : (FY) 2013. The tables on pages 2 through 7 list all MDOT-funded research projects by topic area that were active : or completed duri...
Advanced MHD Algorithm for Solar and Space Science: lst Year Semi Annual Progress Report
NASA Technical Reports Server (NTRS)
Schnack, Dalton D.; Lionello, Roberto
2003-01-01
We report progress for the development of MH4D for the first and second quarters of FY2004, December 29, 2002 - June 6, 2003. The present version of MH4D can now solve the full viscous and resistive MHD equations using either an explicit or a semi-implicit time advancement algorithm. In this report we describe progress in the following areas. During the two last quarters we have presented poster at the EGS-AGU-EUG Joint Assembly in Nice, France, April 6-11, 2003, and a poster at the 2003 International Sherwood Theory Conference in Corpus Christi, Texas, April 28-30 2003. In the area of code development, we have implemented the MHD equations and the semi-implicit algorithm. The new features have been tested.
ERIC Educational Resources Information Center
California Community Colleges, Chancellor's Office, 2005
2005-01-01
This report examines the effects of the fee increase from $11 to $18 per unit that occurred in Fall 2003, along with the effects of budget reductions in the California Community College (CCC) system that occurred beginning in Fiscal Year (FY) 2002-03. In addition, the report provides summary results of an increase in financial aid provided to the…
FY2007 Laboratory Directed Research and Development Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Craig, W W; Sketchley, J A; Kotta, P R
The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2007 (FY07) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: An introduction to the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY07, and a list of publications that resulted frommore » the research in FY07. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.« less
Biological and Environmental Research Program at Oak Ridge National Laboratory, FY 1992--1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report is the 1992--1994 Program Director's Overview Report for Oak Ridge National Laboratory's (ORNL's) Biological and Environmental Research (BER) Program, and as such it addresses KP-funded work at ORNL conducted during FY 1991 and in progress during FY 1992; it also serves as a planning document for the remainder of FY 1992 through FY 1994. Non-BER funded work at ORNL relevant to the mission of OHER is also discussed. The second section of the report describes ORNL facilities and resources used by the BER program. The third section addresses research management practices at ORNL. The fourth, fifth, and sixthmore » sections address BER-funded research in progress, program accomplishments and research highlights, and program orientation for the remainder of FY 1992 through FY 1994, respectively. Work for non-BER sponsors is described in the seventh section, followed by a discussion of significant near and long-term issues facing BER work at ORNL in the eighth section. The last section provides a statistical summary of BER research at ORNL. Appendices supplement the above topics with additional detail.« less
Research and Technology Operating Plan Summary, Fiscal Year 1972 Research and Technology Program
NASA Technical Reports Server (NTRS)
1971-01-01
The NASA Research and Technology program for FY 1972 is presented. It is a compilation of the summary portions of each of the RTOPs (Research and Technology Operating Plan) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Texeira, R.H.; Goodman, B.J.
This report summarizes the research progress and accomplishments of the US Department of Energy (DOE) Ethanol from Biomass Program, field managed by the Solar Energy Research Institute, during FY 1990. The report includes an overview of the entire program and summaries of individual research projects. These projects are grouped into the following subject areas: technoeconomic analysis; pretreatment; cellulose conversion; xylose fermentation; and lignin conversion. Individual papers have been indexed separately for inclusion on the data base.
Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2005
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2006-09-29
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCCmore » Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed. The FY 2004 budget summary for DOE Materials Activities is presented on page 8. The distribution of these funds between DOE laboratories, private industry, academia and other organizations is presented in tabular form on page 10. Following the budget summary is a set of detailed program descriptions for the FY 2004 DOE Materials activities. These descriptions are presented according to the organizational structure of the Department. A mission statement, a budget summary listing the project titles and FY 2004 funding, and detailed project summaries are presented for each Assistant Secretary office, the Office of Science, and the National Nuclear Security Administration. The project summaries also provide DOE, laboratory, academic and industrial contacts for each project, as appropriate.« less
Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2004
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2005-08-31
The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCCmore » Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed. The FY 2004 budget summary for DOE Materials Activities is presented on page 8. The distribution of these funds between DOE laboratories, private industry, academia and other organizations is presented in tabular form on page 10. Following the budget summary is a set of detailed program descriptions for the FY 2004 DOE Materials activities. These descriptions are presented according to the organizational structure of the Department. A mission statement, a budget summary listing the project titles and FY 2004 funding, and detailed project summaries are presented for each Assistant Secretary office, the Office of Science, and the National Nuclear Security Administration. The project summaries also provide DOE, laboratory, academic and industrial contacts for each project, as appropriate.« less
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1990-01-01
The NASA research and technology program for FY 1990 is presented. The summary portions is compiled of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and universities. The first section containing citations and abstracts of the RTOPs is followed by four indices: Subject; Technical Monitor; Responsible NASA Organization; and RTOP number.
2016-10-14
not holding contractors accountable for poor performance while constructing and maintaining facilities. These systemic problems resulted in...portfolio was about $880 billion at the end of FY 2015. Between 2003 and 2008, 18 U.S. military and contractor personnel electrocution fatalities...maintenance of DoD facilities. For instance, Report No. DODIG-2013-099 stated that installations “lacked qualified Government or contractor electricians
U.S. Department of Education FY 2003 Performance and Accountability Report.
ERIC Educational Resources Information Center
Department of Education, Washington, DC.
This is a report on the progress of the U.S. Department of Education's accounting systems and management controls. Sections include: (1) Management's Discussion and Analysis; (2) Performance Details; (3) Financial Details; and (4) Other Statutorily Required Reports. Five appendixes are included along with a glossary of terms and a list of figures.…
Hydrologic Resources Management Program and Underground Tests Area Project FY 2003 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
J., B C; F., E G; K., E B
This report describes FY 2003 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area (UGTA) Project. These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security.more » UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The present report is organized on a topical basis and contains five chapters that reflect the range of technical work performed by LLNL-CBND during FY 2003. Although we have emphasized investigations that were led by CBND, we also participated in a variety of collaborative studies with other UGTA and HRMP contract organizations including the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and Bechtel Nevada (BN).« less
Laboratory Directed Research and Development FY 1998 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
John Vigil; Kyle Wheeler
This is the FY 1998 Progress Report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principle investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic, molecular, optical, and plasma physics, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less
Laboratory directed research and development: FY 1997 progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vigil, J.; Prono, J.
1998-05-01
This is the FY 1997 Progress Report for the Laboratory Directed Research and Development (LDRD) program at Los Alamos National Laboratory. It gives an overview of the LDRD program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principal investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic and molecular physics and plasmas, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less
Annual Progress Report FY-92. Volume 2
1992-01-01
OBJECTIVE To measure the effect of methotrexate on interleukin-l ( IL - 1 ) induced ICAN-l expression in cultured human fibroblasts and adenocarcinoma cells...SUMMARY SHEET TITLE: Effect of IL - 1 on Glucocorticoid Inhibition of Wound Healing KEYWORDS: IL - 1 , wound healing PRINCIPAL INVESTIGATOR: Schoenfeld, Phil CPT...PROGRESS Cultured cells were incubated with IL -l to stimulate ICAM-l expression. In general, the cells responded well. ICAM- 1 was readily detectable
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1992-01-01
This publication represents the NASA research and technology program for FY92. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and technology objectives and plans: Summary fiscal year 1991
NASA Technical Reports Server (NTRS)
1991-01-01
This publication represents the NASA research and technology program for FY 1991. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, industry, and in universities. The first section contains citations and abstracts of the RTOP's and is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1993-01-01
This publication represents the NASA research and technology program for FY-93. It is a compilation of the Summary portions of each of the RTOP's (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOP's is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1988-01-01
This publication represents the NASA research and technology program for FY88. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1989-01-01
This publication represents the NASA research and technology program for FY89. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1985-01-01
This publication represents the NASA research and technology program for FY 1985. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP number.
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1987-01-01
This publication represents the NASA research and technology program for FY87. It is a compilation of the Summary portions of each of the RTOPs (Research and Technology Objectives and Plans) used for management review and control of research currently in progress throughout NASA. The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section containing citations and abstracts of the RTOPs is followed by four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Tactical Aircraft Modernization: Issues for Congress
2007-06-08
Investigations into the V-22 program, its crashes, and allegations of malfeasance came to a head in the spring of 2001. On May 1, 2001, a Blue...procurement of all weapons through FY2003 and would rise to 16% through FY2009 and 18% through FY2015. Representative Curt Weldon stated that since...the FY2000 defense budget. In the spring of 2003 F-22 affordability was again at issue. During an April 11 hearing of the House Government Reform
Validation project. This report describes the procedure used to generate the noise models output dataset , and then it compares that dataset to the...benchmark, the Engineer Research and Development Centers Long-Range Sound Propagation dataset . It was found that the models consistently underpredict the
Wang, Jian; Jacobs, Philip; Ohinmaa, Arto; Dezetter, Anne; Lesage, Alain
2018-04-01
The purpose of this study is to measure provincial spending for mental health services in fiscal year (FY) 2013 and to compare these cost estimates to those of FY 2003. This study estimated the costs of publicly funded provincial mental health services in FY 2013 and compared them to the estimates for FY 2003 from a previously published report. Our data were obtained from publicly accessible databases. The cross-year cost comparisons for provincial mental health services were restricted to general and psychiatric hospital inpatients, clinical payments to physicians and psychologists, and prescribed psychotropic medications. Total public expenditures were inflation adjusted and expressed per capita and as a percentage of the total provincial health spending. Total public spending for mental health and addiction programs/services was estimated to be $6.75 billion for FY 2013. The largest component of the expenditures was hospital inpatient services ($4.02 billion, 59.6%), followed by clinical payments to physicians or psychologists ($1.69 billion, 25%), and then publicly funded prescribed psychotherapeutic medications ($1.04 billion, 15.4%). Nationally, the portion of total public spending on health that was spent on mental health decreased from FY 2003 to FY 2013 from 5.4% to 4.9%. Our results reveal that mental health spending, as a proportion of public health care expenditures, decreased in the decade from FY 2003 to FY 2013. Due to large differences in how the provinces report community mental health services, we still lack a comprehensive picture of the mental health system.
United States Nuclear Data Program (USNDP)
Report FY 2016 Annual Report FY 2015 Annual Report FY 2014 Annual Report FY 2013 Annual Report FY 2012 Annual Report FY 2011 Annual Report FY 2010 Annual Report FY 2009 Annual Report FY 2008 Annual Report FY 2007 Annual Report FY 2006 Annual Report FY 2005 Annual Report FY 2004 Final Report FY 2003 Final
Walter Reed Army Medical Center, Washington, DC Annual Progress Report FY-89. Volume 2. Part 1
1990-01-02
recurrent head and neck cancer who meet the eligibility requirements and consent to the protocol will have central venous catheter placed (if one is...DATE: 06/29/89 WORK UNIT # 6220 DETAIL SUMMARY SHEET TITLE: Epidemiology of HIV In Pediatric and Perinatal Patients - A Natural History Study...of HIV in clinical samples. 16 I I REPORT DATE: 04/04/89 WORK UNIT # 8804 DETAIL SUMMARY SHEET TITLE: The Natural History of HIV Infection and Disease
Technology Development Report: CDDF, Dual Use Partnerships, SBIR/STTR: Fiscal Year 2003 Activities
NASA Technical Reports Server (NTRS)
Bailey, John W.
2004-01-01
The FY2003 NASA John C. Stennis Stennis Space Center (SSC) Technology Development Report provides an integrated report of all technology development activities at SSC. This report actually combines three annual reports: the Center Director's Discretionary Fund (CDDF) Program Report, Dual Use Program Report, and the Small Business Innovation Research (SBIR)/Small Business Technology Transfer (STTR) Program Report. These reports are integrated in one document to summarize all technology development activities underway in support of the NASA missions assigned to SSC. The Dual Use Program Report provides a summary review of the results and status of the nine (9) Dual Use technology development partnership projects funded and managed at SSC during FY2003. The objective of these partnership projects is to develop or enhance technologies that will meet the technology needs of the two NASA SSC Mission Areas: Propulsion Test and Earth Science Applications. During FY2003, the TDTO managed twenty (20) SBIR Phase II Projects and two (2) STTR Phase II Projects. The SBIR contracts support low TRL technology development that supports both the Propulsion Test and the Earth Science Application missions. These projects are shown in the SBIR/STTR Report. In addition to the Phase II contracts, the TDTO managed ten (10) SBIR Phase I contracts which are fixed price, six month feasibility study contracts. These are not listed in this report. Together, the Dual Use Projects and the SBIR/STTR Projects constitute a technology development partnership approach that has demonstrated that success can be achieved through the identification of the technical needs of the NASA mission and using various available partnership techniques to maximize resource utilization to achieve mutual technology goals. Greater use of these partnership techniques and the resource leveraging they provide, is a goal of the TDTO, providing more support to meet the technology development needs of the mission areas at SSC.
National Fire Plan Research and Development 2002 Business Summary
USDA Forest Service
2003-01-01
This report summarizes the progress made by Forest Service NFP R&D in FY2002, the second year of NFP funding. Fire research conducted by Forest Service R&D is working to provide the scientific foundation necessary to increase firefighting safety and effectiveness, enhance restoration of fire-scarred landscapes, reduce fire risk through improved management of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Appel, Gordon John
This report is the milestone deliverable M4FT-17SN111102091 “Summary of Assessments Performed FY17 by SNL QA POC” for work package FT-17SN11110209 titled “Quality Assurance – SNL”. This report summarizes the FY17 assessment performed on Fuel Cycle Technologies / Spent Fuel and Waste Disposition efforts.
7 CFR 1424.5 - Agreement process.
Code of Federal Regulations, 2010 CFR
2010-01-01
... basis. (b) Sign-up each FY will be held for 30 calendar days beginning for: (1) FY 2003 on the date of... participate, an eligible producer must submit a signed agreement during the FY sign-up period. Agreements may be for single or multiple FY's. However, multiple FY agreements require producers to submit annual...
Solar System Exploration Division Strategic Plan, volume 1. Executive summary and overview
NASA Technical Reports Server (NTRS)
1991-01-01
This first document is the first of a six-volume series presenting the Solar System Exploration Division's Strategic Plan for the 10-year period FY 1994 to FY 2003. The overall strategy is characterized by five fundamental precepts: (1) execute the current program; (2) improve the vitality of the program and the planetary science community; (3) initiate innovative, small, low-cost planetary missions; (4) initiate new major and moderate missions; and (5) prepare for the next generation of missions. This Strategic Plan describes in detail our proposed approach to accomplish these goals. Volume 1 provides first an Executive Summary of highlights of each of the six volumes, and then goes on to present an overview of the plan, including a discussion of the planning context and strategic approach. Volumes 2, 3, 4, and 5 describe in detail the initiatives proposed. An integral part of each of these volumes is a set of responses to the mission selection criteria questions developed by the Space and Earth Science Advisory Committee. Volume 2, Mission From Planet Earth, describes a strategy for exploring the Moon and Mars and sets forth proposed moderate missions--Lunar Observer and a Mars lander network. Volume 3, Pluto Flyby/Neptune Orbiter, discusses our proposed major new start candidate for the FY 1994 to FY 1998 time frame. Volume 4, Discovery, describes the Near-Earth Asteroid Rendezvous, as well as other candidates for this program of low-cost planetary missions. Volume 5, Toward Other Planetary Systems, describes a major research and analysis augmentation that focuses on extrasolar planet detection and the study of planetary system processes. Finally, Volume 6 summarizes the technology program that the division has structured around these four initiatives.
Planetary geomorphology research: FY 1990-1991
NASA Technical Reports Server (NTRS)
Malin, M. C.
1991-01-01
Progress in the following research areas is discussed: (1) volatile ice sublimation in a simulated Martian polar environment; (2) a global synthesis of Venusian tectonics; (3) a summary of nearly a decade of field studies of eolian processes in cold volcanic deserts; and (4) a model for interpretation of Martian sediment distribution using Viking observations. Some conclusions from the research are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-01-01
This report summarizes research at the Laboratory for Laser Energetics (LLE), the operation of the National Laser Users` Facility (NLUF), and programs involving the education of high school, undergraduate, and graduate students for FY98. Research summaries cover: progress in laser fusion; diagnostic development; laser and optical technology; and advanced technology for laser targets.
Satellite Power System (SPS) FY 79 program summary
NASA Technical Reports Server (NTRS)
1980-01-01
The Satellite Power System (SPS) program a joint effort to develop an initial understanding of the technical feasibility, the economic practicality, and the social and environmental acceptability of the SPS concept is discussed. This is being accomplished through implementation of the Concept Development and Evaluation Program Plan which is scheduled for completion by the end of FY 1980. This Program Summary not only covers FY 1979 but includes work completed in FY 1977 and FY 1978 in order to give a comprehensive picture of the DOE involvement in the SPS concept development and evaluation process.
ARIES Oxide Production Program Annual Report - FY14
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelley, Evelyn A.; Dinehart, Steven Mark
A summary of the major accomplishments (September), milestones, financial summary, project performance and issues facing the ARIES Oxide Production Program at the close of FY14 is presented in this Executive Summary. Annual accomplishments are summarized in the body of the report.
Summary of NREL's FY13-FY15 Photovoltaic Subprogram
DOE Office of Scientific and Technical Information (OSTI.GOV)
2017-03-31
In this report, you will find summaries of the completed FY13-FY15 Photovoltaic projects that were funded within NREL. The summaries describe the initial motivation for the project; significant achievements, including publications, intellectual property, and collaborations; and remaining challenges. Among the NREL projects, you will find research of almost every major PV technology - from the next generation of silicon PV to relatively new organic PVs - as well as projects advancing PV module durability and characterization. Each of these projects was designed to support SunShot's goals, putting the United States one step closer to widespread use of low-cost, clean electricity.
DOT National Transportation Integrated Search
2010-12-01
This report presents the results for the national evaluation of the FY 2003 Earmarked ITS Integration Project: Southern Wyoming, I-80 Dynamic Message Signs. The I-80 Dynamic Message Signs project is a rural infrastructure deployment of ITS devices th...
1992-01-01
dessert and snack items to increase acceptability and 31$,) UNCLASSIFIED UNCLASSIFIED AMENDED FY 1992/1993 BIENNIAL RDTE DESCRIPTIVE SUMMARY Program...Planned Program: " (U) Finalize development of non-organic and non-polluting processing bids for extruded and molded energetic materials * (U
U.S. Department of Education FY 2010 Summary of Performance and Financial Information
ERIC Educational Resources Information Center
US Department of Education, 2011
2011-01-01
This paper presents the U.S. Department of Education's Fiscal Year (FY) "2010 Summary of Performance and Financial Information." FY 2010 was a transition year for the Department as it moves to a new strategic plan. The Department is still firmly committed to its mission of promoting achievement and preparation for global competitiveness…
Photovoltaic Subcontract Program. Annual report, FY 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R&D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT) project,more » PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
FY 2007 Progress Report for Upper Columbia United Tribes' Regional Coordination.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Michel, D.R.
2008-12-15
This report is a summary of activities conducted over the fiscal year 2007 contract period to fulfill requirements to coordinate Upper Columbia United Tribes (UCUT) interests within the Columbia River Basin. This coordination was specific to the implementation of portions of the Integrated Fish and Wildlife Program within the purview of the Northwest Power and Conservation Council and Bonneville Power Administration.
34 CFR 379.53 - What are the minimum performance levels for each compliance indicator?
Code of Federal Regulations, 2010 CFR
2010-07-01
... employment as follows: (i) No less than 50 percent during fiscal year (FY) 2001. (ii) No less than 51 percent during FY 2002. (iii) No less than 52 percent during FY 2003. (iv) No less than 54 percent during FY 2004. (v) No less than 55 percent during FY 2005 and any year thereafter. (2) Change in earnings. (i...
FY 1992/FY 1993 Budget Descriptive Summaries for the Office of the Secretary of Defense
1991-02-01
UNCLASSIFIED AD-A235 927 TC FY 1992/FY 1993 BUDGET DESCRIPTIVE SUMMARIES FOR THE OFFICE OF THE SECRETARY OF DEFENSE FEBRUARY 1991 Dist. A. per...Institute", to be sponsored by the Director of the Office of Science and Technology Policy. The Institute is required to survey the views of US industry...National Critical.Technologies Panel, chaired by the Director of the Office of Science and Technology Policy, and to analyze worldwide trends. The
A decision-theoretic approach to identifying future high-cost patients.
Pietz, Kenneth; Byrne, Margaret M; Petersen, Laura A
2006-09-01
The objective of this study was to develop and evaluate a method of allocating funding for very-high-cost (VHC) patients among hospitals. Diagnostic cost groups (DCGs) were used for risk adjustment. The patient population consisted of 253,013 veterans who used Department of Veterans Affairs (VA) medical care services in fiscal year (FY) 2003 (October 1, 2002-September 30, 2003) in a network of 8 VA hospitals. We defined VHC as greater than 75,000 dollars (0.81%). The upper fifth percentile was also used for comparison. A Bayesian decision rule for classifying patients as VHC/not VHC using DCGs was developed and evaluated. The method uses FY 2003 DCGs to allocate VHC funds for FY 2004. We also used FY 2002 DCGs to allocate VHC funds for FY 2003 for comparison. The resulting allocation was compared with using the allocation of VHC patients among the hospitals in the previous year. The decision rule identified DCG 17 as the optimal cutoff for identifying VHC patients for the next year. The previous year's allocation came closest to the actual distribution of VHC patients. The decision-theoretic approach may provide insight into the economic consequences of classifying a patient as VHC or not VHC. More research is needed into methods of identifying future VHC patients so that capitation plans can fairly reimburse healthcare systems for appropriately treating these patients.
Highlights, FY 2003-05 Biennial Operating Budget for Higher Education.
ERIC Educational Resources Information Center
Connecticut State Board of Governors for Higher Education, Hartford.
This report explains that the General Fund budget: provides $1,232.6 million for the FY 2003-05 biennium; slashes student financial aid funding by 8.6 percent; includes a reduction of 3 percent for Early Retirement Incentive Plan salary savings; represents a budget that is 16.5 percent below requested current services funding, $15.8 million below…
United States Air Force Statistical Digest, Fiscal Year 1960. Fifteenth Edition
1960-09-30
USAF CIVILIAN EMPLOYEES IN SALARIED AND WAGE BOARD GROUPS EMPLOYED UNDER MILITARY , ASSISTANCE PROGRAM (MAP), AT END OF QUARTER - FY (Previous year...provide summary data on all aspects of the Mlli_ 165 tary Assistance program administered by the Air Force. The data were compiled from progress reports...Military Assistance . MAP AIRCRAFT - Aircraft in foreign countries provided by the USAF under Military Assistance Program . AIRCRAFT ATTRITION - Aircraft
Transportation Analysis and Simulation System Requirements
DOT National Transportation Integrated Search
1973-04-01
This document provides: : a. A brief summary of overall project (PPA OS223) accomplishments during FY 72. : b. A detailed summary of the following two major FY 72 activities: : 1. Analysis of TSC's computation resources and their utilization; : 2. Pr...
Columbia River Basin Fish and Wildlife Program Work Plan for Fiscal Year 1989.
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration. Division of Fish and Wildlife.
1988-11-01
The FY 1989 Columbia River Basin Fish and Wildlife Program Work Plan (Work Plan) presents Bonneville Power Administration's plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1989. The Work Plan focuses on individual Action Items found in the 1987 Program for which Bonneville Power Administration (BPA) has determined that it has authority and responsibility to implement. Each of the entries in the Work Plan includes objectives, background, and progress to date in achieving those objectives, and a summary of plans for implementation in FY 1989. Most Action Items are implemented through one or moremore » BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. The FY 1989 Work Plan emphasizes continuation of 113 projects, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. BPA also plans to start 20 new projects in FY 1989. The number of ongoing FY 1988 projects to be continued in FY 1989 and the number of new projects planned to start in FY 1989 are based on current (September 7, 1988) procurement expectations. Several projects presently in BPA's procurement process are expected to be contracted by September 30, 1988, the last day of FY 1988. Although these projects have not yet started, they have been listed in the Work Plan as ongoing FY 1988 projects, based on projected start dates in late September 1988. Throughout the Work Plan, those projects with projected start dates in September 1988 have been noted.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... Contents I. Executive Summary A. Purpose B. Summary of the Major Provisions C. Summary of Costs, Benefits, and Transfers II. Background A. Hospice Care B. History of the Medicare Hospice Benefit C. Services... IV.C.3. We also update the FY 2014 hospice wage index with more current wage data, and the BNAF will...
Annual Report: Photovoltaic Subcontract Program FY 1990
DOE Office of Scientific and Technical Information (OSTI.GOV)
Summers, K. A.
1991-03-01
This report summarizes the progress of the Photovoltaic (PV) Subcontract Program of the Solar Energy Research Institute (SERI) from October 1, 1989 through September 30, 1990. The PV Subcontract Program is responsible for managing the subcontracted portion of SERI's PV Advanced Research and Development Project. In fiscal year 1990, this included more than 54 subcontracts with a total annualized funding of approximately $11.9 million. Approximately two-thirds of the subcontracts were with universities at a total funding of nearly $3.3 million. The six technical sections of the report cover the main areas of the subcontract program: the Amorphous Silicon Research Project,more » Polycrystalline Thin Films, Crystalline Silicon Materials Research, High-Efficiency Concepts, the New Ideas Program, and the University Participation Program. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1990, and future research directions. Another section introduces the PVMaT project and reports on its progress.« less
High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance
NASA Technical Reports Server (NTRS)
Skinner, Wilbert
2004-01-01
During the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
Chemical and biological nonproliferation program. FY99 annual report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2000-03-01
This document is the first of what will become an annual report documenting the progress made by the Chemical and Biological Nonproliferation Program (CBNP). It is intended to be a summary of the program's activities that will be of interest to both policy and technical audiences. This report and the annual CBNP Summer Review Meeting are important vehicles for communication with the broader chemical and biological defense and nonproliferation communities. The Chemical and Biological Nonproliferation Program Strategic Plan is also available and provides additional detail on the program's context and goals. The body of the report consists of an overviewmore » of the program's philosophy, goals and recent progress in the major program areas. In addition, an appendix is provided with more detailed project summaries that will be of interest to the technical community.« less
FY2016 Advanced Batteries R&D Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Advanced Batteries research and development (R&D) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for projects focusing on batteries for plug-in electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush. This report describes the progress made on the research and development projects funded by the Battery subprogram in 2016. This section covers the Vehicle Technologies Office overview;more » the Battery subprogram R&D overview; Advanced Battery Development project summaries; and Battery Testing, Analysis, and Design project summaries. It also includes the cover and table of contents.« less
77 FR 9620 - Public Availability of FY 2011 Service Contract Inventories
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... DEPARTMENT OF AGRICULTURE Public Availability of FY 2011 Service Contract Inventories AGENCY...: Notice of public availability of FY 2011 Service Contract inventories. SUMMARY: In accordance with... Agriculture is publishing this notice to advise the public of the availability of the FY 2011 Service Contract...
Operation of Reliability Analysis Center (FY88)
1989-10-01
4.1 Current Projects 16 4.2 Completed Projects 22 6.0 FINANCIAL SUMMARY FY 23 7.0 INFORMATION FROM IAC USERS 24 7.1 User Feedback on IAC Services...22 6.0 FINANCIAL SUMMARY FY Operating expenditures for carrying out the Reliability Analysis Center’s on-going operational functions and satisfying...Because the RAC does n~ot stand to benefit from either a favorable or unfavorable appraisal of any contractors design, an unbiased analysis can result
77 FR 5614 - Department of State FY11 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... DEPARTMENT OF STATE [Public Notice 7785] Department of State FY11 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory for FY11 and its analysis of the FY10 inventory. They are available here: http://csm.state.gov...
76 FR 34102 - Request for Comments-LSC Budget Request for FY 2013
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-10
... LEGAL SERVICES CORPORATION Request for Comments--LSC Budget Request for FY 2013 AGENCY: Legal Services Corporation. ACTION: Request for Comments--LSC Budget Request for FY 2013. SUMMARY: The Legal Services Corporation is beginning the process of developing its FY 2013 budget request to Congress and is...
75 FR 54389 - Request for Comments-LSC Budget Request for FY 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-07
... LEGAL SERVICES CORPORATION Request for Comments--LSC Budget Request for FY 2012 AGENCY: Legal Services Corporation. ACTION: Request for Comments--LSC Budget Request for FY 2012. SUMMARY: The Legal Services Corporation is beginning the process of developing its FY 2012 budget request to Congress and is...
77 FR 27801 - Request for Comments-LSC Budget Request for FY 2014
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-11
... LEGAL SERVICES CORPORATION Request for Comments--LSC Budget Request for FY 2014 AGENCY: Legal Services Corporation. ACTION: Request for Comments--LSC Budget Request for FY 2014. SUMMARY: The Legal Services Corporation is beginning the process of developing its FY 2014 budget request to Congress and is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
FOX,K.J.
Brookhaven National (BNL) Laboratory is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, under contract with the U. S. Department of Energy. BNL's total annual budget has averaged about $450 million. There are about 3,000 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually inmore » March, as required by DOE Order 41 3.2A, ''Laboratory Directed Research and Development,'' January 8, 2001, and the LDRD Annual Report guidance, updated February 12, 1999. The LDRD Program obtains its funds through the Laboratory overhead pool and operates under the authority of DOE Order 413.2A. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new ''fundable'' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research ''which could lead to new programs, projects, and directions'' for the Laboratory. As one of the premier scientific laboratories of the DOE, BNL must continuously foster groundbreaking scientific research. At Brookhaven National Laboratory one such method is through its LDRD Program. This discretionary research and development tool is critical in maintaining the scientific excellence and long-term vitality of the Laboratory. Additionally, it is a means to stimulate the scientific community and foster new science and technology ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Annual Report contains summaries of all research activities funded during Fiscal Year 2003. The Project Summaries with their accomplishments described in this report reflect the above. Aside from leading to new fundable or promising programs and producing especially noteworthy research, the LDRD activities have resulted in numerous publications in various professional and scientific journals and presentations at meetings and forums. All FY 2003 projects are listed and tabulated in the Project Funding Table. Also included in this Annual Report in Appendix A is a summary of the proposed projects for FY 2004. The BNL LDRD budget authority by DOE in FY 2003 was $8.5 million. The actual allocation totaled $7.8 million. The following sections in this report contain the management processes, peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included is a metric of success indicators.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
... Division FY 2010 Service Contract Inventory AGENCY: Federal Election Commission. ACTION: Notice of public availability of FY 2010 Service Contract Inventories. SUMMARY: In accordance with Section 743 of Division C of... this notice to advise the public of the availability of the FY 2010 Service Contract inventory. This...
Department of the Navy Transformation Plan: FY 2014-2016
alignment don business priorities (fy14-16) strategic opportunities for transformation don institutional Closing... summary don transformation model Download PDF Submit an Idea Department of the Navy Transformation Plan FY 2014-2016
Analysis of Performance of Selected AFC, ATF Fuels, and Lanthanide Transport
DOE Office of Scientific and Technical Information (OSTI.GOV)
Unal, Cetin; Galloway, Jack D.
2015-09-29
We started to look at the performance of ATF concept in LWRs late in FY14 and finish our studies in FY15. The work has been presented in AFC review meetings, ICAPP and TOPFUEL conferences. The final version of the work is accepted for publication in Nuclear Engineering and Science Journal (NES). The copy of ICAPP and NES papers are attached separately to this document as our milestone deliverables. We made an important progress in the modeling of lanthanide transport in FY15. This work produced an ANS Winter Meeting paper and GLOBAL 2015 paper. GLOBAL 2015 paper is also attached asmore » deliverable of FY15. The work on the lanthanide transport is preliminary. We are exploring other potential mechanisms, in addition to “liquid-like” diffusion mechanisms, proposed by Robert Mariani [1] before we analyze data that will be taken by Ohio State University. This year, we concentrate on developing diffusion kernels and principles of modeling. Next year, this work will continue and analyze the Ohio State data and develop approaches to solve multicomponent diffusion. In addition to three papers we attached to this report, we have done some research on coupling and the development of gas release model for metallic fuels in FY15. They are also preliminary in nature; therefore, we give the summary of what we found rather than an extended report that will be done in FY16.« less
Inpatient imaging utilization: trends of the past decade.
Shinagare, Atul B; Ip, Ivan K; Abbett, Sarah K; Hanson, Richard; Seltzer, Steven E; Khorasani, Ramin
2014-03-01
We have previously reported inpatient imaging utilization trends at our institution from fiscal year (FY) 1984 through FY 2002. In this study, we assessed the trends in imaging utilization for inpatients from FY 2003 through FY 2012. In this institutional review board-approved retrospective study performed at a 793-bed tertiary care academic institution, we reviewed imaging utilization in adult inpatients from October 1, 2002, through September 30, 2012 (FY 2003 through FY 2012), and recorded the gross number of imaging studies coded by modality (conventional [radiography and fluoroscopy], ultrasound, nuclear medicine, CT, and MRI) and associated relative value units (RVUs). We used linear regression to assess trends in number of imaging studies and RVUs per case-mix-adjusted admission (CMAA). The total number of imaging studies, as well as the number of CT, nuclear medicine, and conventional studies adjusted for case mix, decreased (p=0.02, p=0.0006, p=0.0008, and p=0.001, respectively); CT per CMAA increased until FY 2009 and then decreased through FY 2012. Utilization of ultrasound and MRI did not change significantly (p=0.15 and p=0.22, respectively). Unadjusted global RVUs increased until FY 2009 and then showed a slight decrease through FY 2012 (p=0.04), whereas RVUs per CMAA did not change significantly (p=0.18). After decades of continued rise, imaging utilization for inpatients significantly decreased by most measures between FY 2009 and FY 2012. Future studies to evaluate the contribution of various factors to this decline, including efforts to reduce inappropriate use of imaging and concerns about potential harms of radiation exposure, may be helpful in optimizing imaging utilization and resource planning.
Federal Expenditures by State for Fiscal Year 1989.
ERIC Educational Resources Information Center
Bureau of the Census (DOC), Washington, DC. Governments Div.
Twelve data tables are presented covering federal grants, salaries and wages, direct payments to individuals, procurement contracts, and other direct federal expenditures, by state and by territory, for fiscal year 1989 (FY89), with some summary trend data. The tables provide the following data for FY89, respectively: (1) summary distribution of…
FY2007 Supplemental Appropriations for Defense, Foreign Affairs, and Other Purposes
2007-05-02
73 Liquidation of TSA Contract and Grant Obligations . . . . . . . . . . . . . . . . . . . . . . 76 Ongoing Katrina Recovery...Administration ( TSA ) contract and grant obligations incurred during FY2002 and FY2003. Congress is also considering additions of unrequested funds for...funding shown in brackets) : ! $520 million for Bradley base sustainment ($1.4 billion in bridge); ! $1.6 billion for the Family of Medium Tactical
Department of Defense Review of the Foreign Comparative Testing Program FY2005-FY2006
2007-04-01
Kingdom as a potential alternative to an ongoing domestic development program, which was failing to meet the size, weight , and cost objectives. The...Norway, Switzerland NAMMO, Oerlikon Contraves 0.50 USMC 40mm Training Cartridge MK281 Germany Nico Pyrotechnik 13.14 USMC High Rate-of-Fire .50 Cal...late FY 2003 and, although the system performed as advertised, it did not meet stringent weight requirements. In FY 2005, a down-sized version of
FY 2003 Scientific and Technical Reports, Articles, Papers, and Presentations
NASA Technical Reports Server (NTRS)
Fowler, B. A. (Compiler)
2004-01-01
This Technical Memorandum (TM) presents formal NASA technical reports, papers published in technical journals, and presentations by Marshall Space Flight Center (MSFC) personnel in FY 2003. It also includes papers of MSFC contractors. After being announced in STAR, all NASA series reports may be obtained from the National Technical Information Service, 5285 Port Royal Road, Spring.eld, VA 22161. The information in this TM may be of value to the scientific and engineering community in determining what information has been published and what is available.
Photovoltaic Subcontract Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, Thomas; Catalano, Anthony
1993-03-01
This report summarizes the fiscal year (FY) 1992 progress of the subcontracted photovoltaic (PV) research and development (R D) performed under the Photovoltaic Advanced Research and Development Project at the National Renewable Energy Laboratory (NREL)-formerly the Solar Energy Research Institute (SERI). The mission of the national PV program is to develop PV technology for large-scale generation of economically competitive electric power in the United States. The technical sections of the report cover the main areas of the subcontract program: the Crystalline Materials and Advanced Concepts project, the Polycrystalline Thin Films project, Amorphous Silicon Research project, the Photovoltaic Manufacturing Technology (PVMaT)more » project, PV Module and System Performance and Engineering project, and the PV Analysis and Applications Development project. Technical summaries of each of the subcontracted programs provide a discussion of approaches, major accomplishments in FY 1992, and future research directions.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... Environmental Protection Agency FY 2010 Service Contract Inventory AGENCY: Environmental Protection Agency. ACTION: Notice of public availability of FY 2010 Service Contract inventories. SUMMARY: In accordance... 2010 Service Contract inventory. This inventory provides information on service contract actions over...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... Environmental Protection Agency FY 2011 Service Contract Inventory AGENCY: Environmental Protection Agency. ACTION: Notice of Public Availability of FY 2011 Service Contract Inventories. SUMMARY: In accordance... 2011 Service Contract Inventory. This inventory provides information on service contract actions over...
Financial Summary Tables. Department of Defense Budget for Fiscal Year 1979
1978-01-01
79 Q FAD 740 - Object Classification Distribution of Direct and Reimbursable Obligations, FY 77, FY 78 and FY 79 .U 762 - FY 1979 Reimbursable Program...FAO-738/79 (FILE IN VOL. It JAN 23, 1978 PAGE 1 UOGET BALANCES REIMBURSABLE RECOVERIES TOTAL DIRECT OBLIGATIONS...m.---- .---- ...------.m.---- -..m.----.......---e e e ee-- - - - DIRECT OBLIGATIONS REIMBURSABLE TOTAL WRITEOFFS UNOBLIGATED UNOBLIGATED
Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017.
Watson, Crystal R; Watson, Matthew; Sell, Tara Kirk
2017-09-01
To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained.
Public Health Preparedness Funding: Key Programs and Trends From 2001 to 2017
Sell, Tara Kirk
2017-01-01
Objectives. To evaluate trends in funding over the past 16 years for key federal public health preparedness and response programs at the US Department of Health and Human Services, to improve understanding of federal funding history in this area, and to provide context for future resource allocation decisions for public health preparedness. Methods. In this 2017 analysis, we examined the funding history of key federal programs critical to public health preparedness by reviewing program budget data collected for our annual examination of federal funding for biodefense and health security programs since fiscal year (FY) 2001. Results. State and local preparedness at the Centers for Disease Control and Prevention initially received $940 million in FY2002 and resulted in significant preparedness gains, but funding levels have since decreased by 31%. Similarly, the Hospital Preparedness Program within the Office of the Assistant Secretary for Preparedness and Response was funded at a high of $515 million in FY2003, but funding was reduced by 50%. Investments in medical countermeasure development and stockpiling remained relatively stable. Conclusions. The United States has made significant progress in preparing for disasters and advancing public health infrastructure. To enable continued advancement, federal funding commitments must be sustained. PMID:28892451
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2011-0105] Public Availability of Social Security Administration Fiscal Year (FY) 2011 Service Contract Inventory AGENCY: Social Security Administration. ACTION: Notice of Public Availability of FY 2011 Service Contract Inventories. SUMMARY: In accordance with...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-29
... SOCIAL SECURITY ADMINISTRATION [Docket No. SSA-2013-0001] Public Availability of Social Security Administration Fiscal Year (FY) 2012 Service Contract Inventory AGENCY: Social Security Administration. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In accordance with...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... Environmental Protection Agency FY 2012 Service Contract Inventory AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of public availability of FY 2012 Service Contract Inventories. SUMMARY: In accordance... 2012 Service Contract Inventory. This inventory provides information on service contract actions over...
FY 2017 Oregon transportation needs and issues survey : summary of statewide results.
DOT National Transportation Integrated Search
2017-12-01
The Oregon Transportation Needs and Issues Survey was first conducted in 1993 and has been done roughly every two years. The latest survey was completed in Autumn 2016 (State fiscal year (FY) 2017). This report summarizes the results of the FY 2017 s...
78 FR 37653 - Notice of Fiscal Year (FY) 2014 Safety Grants and Solicitation for Applications
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration Notice of Fiscal Year (FY) 2014 Safety Grants and Solicitation for Applications AGENCY: Federal Motor Carrier Safety.... SUMMARY: FMCSA announces the availability of FY 2014 safety grant opportunities and application due dates...
FY 2003-2007 proposed airport improvement program
DOT National Transportation Integrated Search
2002-01-01
Governor Ryan's Illinois FIRST infrastructure investment initiative provides state funding to match airport improvement projects. For Fiscal Years 2003 through 2007, the Illinois Department of Transportation's Proposed Airport Improvement Program inc...
U.S. Department of Transportation Fiscal Year 2004 Budget in Brief
DOT National Transportation Integrated Search
2003-01-01
The Department's FY 2004 budget request totals $54.3 billion in mandatory and discretionary funding. This represents an overall increase of $2.9 billion or 6 percent when compared to the President's FY 2003 request. The Department's five key performa...
Ecological Characterization Data for the 2004 Composite Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Downs, Janelle L.; Simmons, Mary A.; Stegen, Jennifer A.
2004-11-01
A composite analysis is required by U.S. Department of Energy (DOE) Order 435.1 to ensure public safety through the management of active and planned low-level radioactive waste disposal facilities associated with the Hanford Site. The original Hanford Site Composite Analysis of 1998 must be revised and submitted to DOE Headquarters (DOE-HQ) in 2004 because of revisions to waste site information in the 100, 200, and 300 Areas, updated performance assessments and environmental impact statements (EIS), changes in inventory estimates for key sites and constituents, and a change in the definition of offsite receptors. Beginning in fiscal year (FY) 2003, themore » DOE Richland Operations Office (DOE-RL) initiated activities, including the development of data packages, to support the 2004 Composite Analysis. This report describes the data compiled in FY 2003 to support ecological site assessment modeling for the 2004 Composite Analysis. This work was conducted as part of the Characterization of Systems Task of the Groundwater Remediation Project (formerly the Groundwater Protection Program) managed by Fluor Hanford, Inc., Richland, Washington. The purpose of this report is to provide summaries of the characterization information and available spatial data on the biological resources and ecological receptors found in the upland, riparian, aquatic, and island habitats on the Hanford Site. These data constitute the reference information used to establish parameters for the ecological risk assessment module of the System Assessment Capability and other assessment activities requiring information on the presence and distribution of biota on the Hanford Site.« less
FY2013 Defense Budget Request: Overview and Context
2012-04-20
Prescribed by ANSI Std Z39-18 FY2013 Defense Budget Request: Overview and Context Congressional Research Service Summary This report analyzes ...Congressional action on the FY2013 defense budget will be analyzed in a separate report. The FY2013 Department of Defense (DOD) budget request...defense-related nuclear programs conducted by the Department of Energy , and other activities. For discretionary DOD budget authority, the request includes
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-16
... DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: BP-12] Fiscal Year (FY) 2012... Comment AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION: Notice of FY 2012-2013 proposed transmission rate adjustments. SUMMARY: BPA is holding a consolidated rate...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
... GENERAL SERVICES ADMINISTRATION [Notice-MV-2013-02; Docket No. 2013-0002; Sequence 3] Public Availability of General Services Administration FY 2012 Service Contract Inventory AGENCY: General Services Administration (GSA). ACTION: Notice of Public Availability of FY 2012 Service Contract Inventories. SUMMARY: In...
77 FR 23293 - Service Contract Inventory for Fiscal Year (FY) 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-18
... OFFICE OF SPECIAL COUNSEL Service Contract Inventory for Fiscal Year (FY) 2011 AGENCY: Office of Special Counsel. ACTION: Notice of availability--FY 2011 Service Contract Inventory. SUMMARY: Through this... contract inventory on its Web site, at http://www.osc.gov/RR_OSCReportsAndInformation.htm . A service...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... 2010 Service Contract Inventory AGENCY: Federal Communications Commission. ACTION: Notice of public availability of FY 2010 Service Contract Inventory. SUMMARY: The Federal Communications Commission is publishing this notice to advise the public of the availability of the FY 2010 Service Contract Inventory as...
FY 2009 Oregon Transportation Needs and Issues Survey : Summary of Statewide Results
DOT National Transportation Integrated Search
2009-12-01
The Oregon Transportation Needs and Issues Survey was first conducted in 1993 and has been done roughly every two years. The latest survey was completed in the fall of 2008 (State fiscal year (FY) 2009). This report summarizes the results of the FY 2...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Public Availability of Defense Nuclear Facilities Safety Board FY 2010 Service Contract Inventory AGENCY: Defense Nuclear Facilities Safety Board (Board). ACTION: Notice of public availability of FY 2010 Service Contract Inventories. SUMMARY: In accordance with...
Development Achievements for Fiscal 1990.
ERIC Educational Resources Information Center
Smoot, Joseph G.
This document presents the Fiscal Year (FY) 1990 report of Kansas' Pittsburg State University's (PSU) development program. The report addresses the annual fund, the campaign for distinction, the PSU foundation, and development plans for FY 1991. It includes an overview of FY 1990 activities and an executive summary. Among the findings presented…
Adjusting First-Term Contract Lengths in the Navy: Implications and Recommendations
2013-07-01
1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 6YO 5YO 4YO 3YO 2YO25 Figure 6 shows the average default obligation...obligations for a few 4YO ratings, started in FY11 and has been approved to expand from 4 to 15 ratings in FY13 and FY14 total. Even though we offer some
FY2016 Advanced Batteries R&D Annual Progress Report - Part 3 of 5
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Advanced Batteries research and development (R&D) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for projects focusing on batteries for plug-in electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush. This report describes the progress made on the research and development projects funded by the Battery subprogram in 2016. This section covers the summaries of the Appliedmore » Batteries Research for Transportation Projects part 2.« less
FY2016 Advanced Batteries R&D Annual Progress Report - Part 2 of 5
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Advanced Batteries research and development (R&D) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for projects focusing on batteries for plug-in electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush. This report describes the progress made on the research and development projects funded by the Battery subprogram in 2016. This section covers the summaries of the Appliedmore » Batteries Research for Transportation Projects part 1.« less
Information Resources Management Long Range Plan, FY 1995-1999
NASA Technical Reports Server (NTRS)
1994-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Major IRM Program Accomplishments for FY 1993; Information Collection Budget; Summary of Computer Security Plans; Appendix: Acronym List.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-18
... DEPARTMENT OF ENERGY Bonneville Power Administration [BPA File No.: BP-12] Fiscal Year (FY) 2012... AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTIONS: Notice of FY 2012-2013 Proposed Power Rate Adjustments. SUMMARY: BPA is holding a consolidated rate proceeding, Docket No...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... contract inventory should be directed to Ms. Dawn DiGiorgio, Administrative Operations, Office of the... FY 2012 Service Contract Inventory AGENCY: Federal Communications Commission. ACTION: Notice. SUMMARY... availability of the FY 2012 Service Contract Inventory as required by Section 743 of Division C of the...
Summary Report on Solid-oxide Electrolysis Cell Testing and Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
J.E. O'Brien; X. Zhang; R.C. O'Brien
2012-01-01
Idaho National Laboratory (INL) has been researching the application of solid-oxide electrolysis cells (SOECs) for large-scale hydrogen production from steam over a temperature range of 800 to 900 C. From 2003 to 2009, this work was sponsored by the United States Department of Energy Nuclear Hydrogen Initiative, under the Office of Nuclear Energy. Starting in 2010, the high-temperature electrolysis (HTE) research program has been sponsored by the INL Next Generation Nuclear Plant Project. This report provides a summaryof program activities performed in Fiscal Year (FY) 2011 and the first quarter of FY-12, with a focus on small-scale testing and cellmore » development activities. HTE research priorities during this period have included the development and testing of SOEC and stack designs that exhibit high-efficiency initial performance and low, long-term degradation rates. This report includes contributions from INL and five industry partners: Materials and Systems Research, Incorporated (MSRI); Versa Power Systems, Incorporated (VPS); Ceramatec, Incorporated; National Aeronautics and Space Administration - Glenn Research Center (NASA - GRC); and the St. Gobain Advanced Materials Division. These industry partners have developed SOEC cells and stacks for in-house testing in the electrolysis mode and independent testing at INL. Additional fundamental research and post-test physical examinations have been performed at two university partners: Massachusetts Institute of Technology (MIT) and the University of Connecticut. Summaries of these activities and test results are also presented in this report.« less
LDEF systems special investigation group overview
NASA Technical Reports Server (NTRS)
Mason, Jim; Dursch, Harry
1995-01-01
The Systems Special Investigation Group (Systems SIG), formed by the LDEF Project Office to perform post-flight analysis of LDEF systems hardware, was chartered to investigate the effects of the extended LDEF mission on both satellite and experiment systems and to coordinate and integrate all systems related analyses performed during post-flight investigations. The Systems SIG published a summary report in April, 1992 titled 'Analysis of Systems Hardware Flown on LDEF - Results of the Systems Special Investigation Group' that described findings through the end of 1991. The Systems SIG, unfunded in FY 92 and FY93, has been funded in FY 94 to update this report with all new systems related findings. This paper provides a brief summary of the highlights of earlier Systems SIG accomplishments and describes tasks the Systems SIG has been funded to accomplish in FY 94.
76 FR 2924 - Notice of Availability of the FY2010 Inventory of Service Contracts for the National...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... Contracts for the National Transportation Safety Board (NTSB) SUMMARY: In accordance with Section 743 of Division C of the FY2010 Consolidated Appropriations Act, Public Law 111-175, the NTSB announces the availability of the FY2010 inventory of service contracts. ADDRESSES: The inventory is available electronically...
FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2016-03-01
This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements andmore » challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of approximately 45 percent since 2010. If adopted by Congress, the FY 2017 budget request will increase funding by $396 million (about 4.5 percent) from the enacted FY 2016 level. A significant portion of the increase would fund the research for multiple life extension programs, support the programs in Directed Stockpile Work, and modernize the physical infrastructure of the nuclear security enterprise.« less
Integrated Disposal Facility FY 2012 Glass Testing Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pierce, Eric M.; Kerisit, Sebastien N.; Krogstad, Eirik J.
2013-03-29
PNNL is conducting work to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility for Hanford immobilized low-activity waste (ILAW). Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program, PNNL is implementing a strategy, consisting of experimentation and modeling, to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. Keymore » activities in FY12 include upgrading the STOMP/eSTOMP codes to do near-field modeling, geochemical modeling of PCT tests to determine the reaction network to be used in the STOMP codes, conducting PUF tests on selected glasses to simulate and accelerate glass weathering, developing a Monte Carlo simulation tool to predict the characteristics of the weathered glass reaction layer as a function of glass composition, and characterizing glasses and soil samples exhumed from an 8-year lysimeter test. The purpose of this report is to summarize the progress made in fiscal year (FY) 2012 and the first quarter of FY 2013 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of LAW glasses.« less
FTA multi-year research program plan (FY 2009 - FY 2013).
DOT National Transportation Integrated Search
2008-09-01
The Multi-Year Research Program Plan (Program Plan), prepared by the Federal Transit Administrations (FTA) Office of : Research, Demonstration, and Innovation (TRI), is part of FTAs strategic planning process. It provides descriptive : summarie...
Hanford Site Environmental Safety and Health Fiscal Year 2001 Budget-Risk management summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
REEP, I.E.
1999-05-12
The Hanford Site Environment, Safety and Health (ES&H) Budget-Risk Management Summary report is prepared to support the annual request to sites in the U.S. Department of Energy (DOE) Complex by DOE, Headquarters. The request requires sites to provide supplementary crosscutting information related to ES&H activities and the ES&H resources that support these activities. The report includes the following: (1) A summary status of fiscal year (FY) 1999 ES&H performance and ES&H execution commitments; (2)Status and plans of Hanford Site Office of Environmental Management (EM) cleanup activities; (3) Safety and health (S&H) risk management issues and compliance vulnerabilities of FY 2001more » Target Case and Below Target Case funding of EM cleanup activities; (4) S&H resource planning and crosscutting information for FY 1999 to 2001; and (5) Description of indirect-funded S&H activities.« less
FY2016 Advanced Batteries R&D Annual Progress Report - Part 5 of 5
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Advanced Batteries research and development (R&D) subprogram within the DOE Vehicle Technologies Office (VTO) provides support and guidance for projects focusing on batteries for plug-in electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush. This report describes the progress made on the research and development projects funded by the Battery subprogram in 2016. This section cover Advanced Battery Materials Research (BMR)more » part 2, Battery500 Innovation Centers project summaries, and appendices.« less
Summary of Granulation Matrix Testing for the Plutonium Immobilization Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Herman, C.C.
2001-10-19
In FY00, a matrix for process development testing was created to identify those items related to the ceramic process that had not been fully developed or tested and to help identify variables that needed to be tested. This matrix, NMTP/IP-99-003, was jointly created between LLNL and SRTC and was issued to all affected individuals. The matrix was also used to gauge the progress of the development activities. As part of this matrix, several series of tests were identified for the granulation process. This summary provides the data and results from the granulation testing. The results of the granulation matrix testingmore » were used to identify the baseline process for testing in the PuCTF with cold surrogates in B241 at LLNL.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walters, T.; Savage, S.; Brown, J.
At the request of the U. S. Department of Agriculture (USDA) Rural Development, the National Renewable Energy Laboratory reviewed projects awarded in the Section 9006 Program: Renewable Energy Systems and Energy Efficiency Improvements Program. This report quantifies federal and private investment, outlines project status based on recent field updates, and calculates the effects on energy and emissions of energy efficiency and renewable energy projects awarded grants in FY 2003, FY 2004, and FY 2005. An overview of the program challenges and modifications in the first three years of operation is also included.
Naugle, Alecia Larew; Holt, Kristin G; Levine, Priscilla; Eckel, Ron
2005-03-01
We analyzed raw ground beef testing data to determine whether a decrease in the rate of Escherichia coli O157:H7-positive raw ground beef samples has occurred since the inception of Food Safety and Inspection Service (U.S. Department of Agriculture) regulatory actions and microbiological testing concerning this commodity and pathogen. A main effects log-linear Poisson regression model was constructed to evaluate the association between fiscal year and the rate of E. coli O157:H7-positive raw ground beef samples while controlling for the effect of season for the subset of test results obtained from fiscal year (FY)2000 through FY2003. Rate ratios were used to compare the rate of E. coli O157:H7-positive raw ground beef samples between sequential years to identify year-to-year differences. Of the 26,521 raw ground beef samples tested from FY2000 through FY2003, 189 (0.71%) tested positive for E. coli O157:H7. Year-to-year comparisons identified a 50% reduction in the rate of positive ground beef samples from FY2002 to FY2003 when controlling for season (95% CI, 10 to 72% decrease; P = 0.02). This decrease was the only significant year-to-year change in the rate of E. coli O157:H7-positive raw ground beef samples but was consistent in samples obtained from both federally inspected establishments and retail outlets. We believe this decrease is attributed to specific regulatory actions by Food Safety and Inspection Service and subsequent actions implemented by the industry, with the goal of reducing E. coli O157:H7 adulteration of raw ground beef. Continued monitoring is necessary to confirm that the decrease in the rate of E. coli O157:H7 in raw ground beef samples we observed here represents the beginning of a sustained trend.
Final report : oceanic surveillance and navigation analysis, FY 71.
DOT National Transportation Integrated Search
1971-06-01
The report summarizes the oceanic surveillance and navigation analysis performed at Transportation Systems Center under PPA FA-04 for FY 71. Three major efforts are reviewed and discussed herein: summary of the North Atlantic Systems Planning Group c...
NASA Information Resources Management Long Range Plan, FY 1994-1998
NASA Technical Reports Server (NTRS)
1993-01-01
Table of Contents: Introduction; Agency 5-Year IRM Investment Projections; Program Specific IRM Activities by Program Office; Major IRM Program Accomplishments for FY 1992; Information Collection Budget; Summary of Computer Security Plans; and Appendix: Acronym List.
Laboratory Directed Research and Development FY 2000 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Ayat, R
This Annual Report provides an overview of the FY2000 Laboratory Directed Research and Development (LDRD) Program at Lawrence Livermore National Laboratory (LLNL) and presents a summary of the results achieved by each project during the year.
76 FR 1471 - FY 2010 Annual Compliance Report; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-10
... issued rules on periodic reporting of service performance measurement and customer satisfaction in FY...-FY10- 29. Id. at 12. Customer satisfaction. The FY 2010 ACR discusses the Postal Service's transition... filing; service performance results; levels of customer satisfaction achieved; progress toward goals...
Environmental Management System Objectives & Targets Results Summary - FY 2015.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vetter, Douglas W.
2016-02-01
Sandia National Laboratories (SNL) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL's operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose ofmore » this document is to summarize the results achieved and documented in FY 2015.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory, Louis
2014-12-02
This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to and from the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. There was one shipment of two drums sent for offsite treatment and disposal. This report summarizes the 4th quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annualmore » summaries for FY 2014.« less
1981-01-01
ACTIVITIES .......... ............................ 111-548 3/ de ~ &04A.... ~UNCLASSIFIED xiii 0- 4 UNCLASSIFIED FY 1932 ROTE CONGRESSIONAI. DESCRIPTIVE...Title: Comeunicatiois gnlineerin De -elo pmnt DOD Mission Area: i256 - Tactical Communications Sudget Activity: 04 - TactictI Programs Into the...tconditions ot heavy miiltary traffic, high speeds, and severe weather. Army Remote Sensors (REMS) were used to provide 4-cnrity of the Olympic Village complex
CAA Annual Report Fiscal Year 1998.
1998-12-01
Studies , 3-1 Quick Reaction Analyses & Projects 3-1 4 TECHNOLOGY RESEARCH AND ANALYSIS SUPPORT 4-1 Technology Research 4-1 Methodology Research 4-2...Publications, Graphics, and Reproduction 5-2 6 ANALYTICAL EFFORTS COMPLETED BETWEEN FY90 AND FY98 6-1 Appendix A Annual Study , Work Evaluation...future. Chapter 2 highlights major studies and analysis activities which occurred in FY 98. Chapter 3 is the total package of analytical summaries
77 FR 28615 - Fiscal Year (FY) 2012 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Substance Abuse and Mental Health Services Administration Fiscal Year (FY) 2012 Funding Opportunity AGENCY: Substance Abuse and Mental Health Services... Salinas, CA. SUMMARY: This notice is to inform the public that the Substance Abuse and Mental Health...
77 FR 28614 - Fiscal Year (FY) 2012 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-15
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Substance Abuse and Mental Health Services Administration Fiscal Year (FY) 2012 Funding Opportunity AGENCY: Substance Abuse and Mental Health Services... Angeles (UCLA). SUMMARY: This notice is to inform the public that the Substance Abuse and Mental Health...
77 FR 53170 - Siuslaw Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... DEPARTMENT OF AGRICULTURE Forest Service Siuslaw Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of Meeting. SUMMARY: The Siuslaw Resource Advisory Committee will meet in Corvallis, OR. The purpose of the meeting is RAC FY13 Business, Elect Chairperson, Set FY13 Overhead Rate...
76 FR 48173 - Fiscal Year (FY) 2011 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-08
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Substance Abuse and Mental Health Services Administration Fiscal Year (FY) 2011 Funding Opportunity AGENCY: Substance Abuse and Mental Health Services...., Anniston, AL. SUMMARY: This notice is to inform the public that the Substance Abuse and Mental Health...
76 FR 44343 - Fiscal Year (FY) 2011 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-25
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Substance Abuse and Mental Health Services Administration Fiscal Year (FY) 2011 Funding Opportunity AGENCY: Substance Abuse and Mental Health Services... Child Traumatic Stress. SUMMARY: This notice is to inform the public that the Substance Abuse and Mental...
ERIC Educational Resources Information Center
Miller, Cynthia; Deitch, Victoria; Hill, Aaron
2010-01-01
Between 2000 and 2003, the Employment Retention and Advancement (ERA) project identified and implemented a diverse set of innovative models designed to promote employment stability and wage or earnings progression among low-income individuals, mostly current or former welfare recipients. The project's goal was to determine which strategies could…
Particle Physics at the University of Pittsburgh Summary Report for Proposal Period FY'09-11
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boudreau, Joe; Dytman, Steven; Mueller, James
Presented is the final summary report for grant DOE-FG02-91ER40646. The HEP group at the University consists of three tasks: B,D and L. Task B supports Pitt's CDF group at the energy frontier which includes Joe Boudreau and Paul Shepard. Work of the group includes Hao Song's thesis on the measurement of the B_c lifetime using exclusive J/psi+pion decays, and an update of the previous B_c semi-leptonic analyses under the supervision of Paul Shepard. Task D supports Pitt's neutrino group at the intensity frontier which includes PIs Dytman, Naples and Paolone. The group also includes postdoctoral research associate Danko, and thesismore » students Isvan (MINOS), Eberly (Minerva ), Ren (Minerva )and Hansen (T2K). This report summarizes their progress on ongoing experiments which are designed to make significant contributions to a detailed understanding of the neutrino mixing matrix. Task L supports Pitt's ATLAS group at the energy frontier and includes investigators Vladimir Savinov, James Mueller and Joe Boudreau. This group contributed both to hardware (calorimeter electronics, Savinov) and to software (Simulation, Detector Description, and Visualization: Boudreau and Mueller; MC generators: Savinov) and a summary of their progress is presented.« less
Tanks Focus Area Site Needs Assessment - FY 2001
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Robert W.; Josephson, Gary B.; Westsik, Joseph H.
2001-04-30
The TFA uses a systematic process for developing its annual program that draws from the tanks science and technology development needs expressed by the five DOE tank waste sites. TFA's annual program development process is iterative and involves the following steps: Collection of site needs; Needs analysis; Development of technical responses and initial prioritization; Refinement of the program for the next fiscal year; Formulation of the Corporate Review Budget (CRB); Preparation of Program Execution Guidance (PEG) for the next FY Revision of the Multiyear Program Plan (MYPP). This document describes the outcomes of the first phase of this process, frommore » collection of site needs to the initial prioritization of technical activities. The TFA received site needs in October - December 2000. A total of 170 site needs were received, an increase of 30 over the previous year. The needs were analyzed and integrated, where appropriate. Sixty-six distinct technical responses were drafted and prioritized. In addition, seven strategic tasks were approved to compete for available funding in FY 2002 and FY 2003. Draft technical responses were prepared and provided to the TFA Site Representatives and the TFA User Steering Group (USG) for their review and comment. These responses were discussed at a March 15, 2001, meeting where the TFA Management Team established the priority listing in preparation for input to the DOE Office of Science and Technology (OST) budget process. At the time of publication of this document, the TFA continues to finalize technical responses as directed by the TFA Management Team and clarify the intended work scopes for FY 2002 and FY 2003.« less
Fiscal Year 2016 Revegetation Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nordstrom, Jenifer B.
This report summarizes the Fiscal Year (FY) 2016 Revegetation Assessment by Battelle Energy Alliance, LLC. This assessment was conducted to document revegetation efforts at Idaho National Laboratory to verify restoration of disturbed vegetation and soil at various locations occurs as required. This report provides the following information for projects at Idaho National Laboratory completed during FY 2016 that were identified during the National Environmental Policy Act review process as having the potential to disturb soils or vegetation: 1) A summary of all projects identified as having the potential to require revegetation efforts 2) A summary of site disturbance and restorationmore » efforts of each project. For FY 2016, one project required revegetation and sagebrush restoration. For other projects, implementation of best management practices minimized impacts to vegetation and revegetation efforts were not required.« less
Defense Logistics Agency FY 1998 Property, Plant, and Equipment Financial Reporting
1999-04-26
0it ort DEFENSE LOGISTICS AGENCY FY 1998 PROPERTY, PLANT, AND EQUIPMENT FINANCIAL REPORTING Report No. 99-142 April 26, 1999 Office of the Inspector...LOGISTICS AGENCY SUBJECT: Audit Report on Defense Logistics Agency FY 1998 Property, Plant, and Equipment Financial Reporting (Report No. 99-142) We...Property, Plant, and Equipment Financial Reporting Executive Summary Introduction. The audit was performed in support of our work to meet the requirements of
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
... GENERAL SERVICES ADMINISTRATION [2011-MV-1; Docket No. 2011-0006; Sequence 4] Public Availability of General Services Administration FY 2010 Service Contract Inventory AGENCY: Office of Acquisition Policy; General Services Administration (GSA). ACTION: Notice. SUMMARY: This notice announces that GSA is...
76 FR 9399 - Department of State FY10 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-17
... DEPARTMENT OF STATE [Public Notice 7321] Department of State FY10 Service Contract Inventory... Contract Inventory. SUMMARY: The Department of State has publically released its Service Contract Inventory..., requires Department of State, and other civilian agencies, to submit an annual inventory of service...
78 FR 65978 - Draft Revised Strategic Plan for FY 2014-2018
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2014-2018 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with Office of Management and Budget Circular No. A-11, the Defense Nuclear Facilities Safety Board (DNFSB) is soliciting...
75 FR 4794 - Draft Revised Strategic Plan for FY 2010-2015
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... DEFENSE NUCLEAR FACILITIES SAFETY BOARD Draft Revised Strategic Plan for FY 2010-2015 AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Notice. SUMMARY: In accordance with OMB Circular No. A-11, the Defense Nuclear Facilities Safety Board is soliciting comments from all interested and potentially...
75 FR 11841 - Repowering Assistance Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... application window. SUMMARY: RBS is announcing a new application window to submit applications for the...-time application window for remaining FY 2009 funds. Paperwork Reduction Act In accordance with the... allocate all of the FY 2009 authorized funds. Therefore, the Agency is opening a new application window to...
Laboratory Directed Research and Development Program FY2016 Annual Summary of Completed Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
ORNL FY 2016 Annual Summary of Laboratory Directed Research and Development Program (LDRD) Completed Projects. The Laboratory Directed Research and Development (LDRD) program at ORNL operates under the authority of DOE Order 413.2C, “Laboratory Directed Research and Development” (October 22, 2015), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. The LDRD program funds are obtained through a charge to all Laboratory programs. ORNL reports its status to DOE in March of each year.
Summary of Pellet Technology Program Activities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gebhart, III, Gerald E.; Baylor, Larry R.; Bell, Gary L.
This report summarizes the activities and budget information of ORNL’s pellet technology program from the start of FY2014 through FY2017. Cost summaries are broken down by year and spending category. Milestone activities are outlined and described by year and further described in the project narrative. The project narrative outlines the main pellet injection technology advances enabled by the pellet technology program. A list of published research products is included, along with biographies of personnel involved. This document was prepared in support of the April 24, 2018, review of the pellet technology program at ORNL.
FY2016 Update on ILAW Glass Testing for Disposal at IDF
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brown, E. E.; Swanberg, D. J.; Muller, Isabelle S.
2017-04-12
This status report provides a FY2016 update on work performed to collect information on the corrosion behavior of LAW glasses to support the IDF PA. In addition to the development of the baseline operating envelope for the WTP, since 2003, VSL has developed a wide range of LAW formulations that achieve considerably higher waste loadings than the WTP baseline formulations.
2003-02-03
Financial Management February 3, 2003 Office of the Inspector General of the Department of Defense Financial Reporting of Deferred Maintenance...Type N/A Dates Covered (from... to) - Title and Subtitle Financial Management: Financial Reporting of Deferred Maintenance Information on Army...the Department of Defense Report No. D-2003-054 February 3, 2003 (Project No. D2001FJ-0156.002) Financial Reporting of Deferred Maintenance
78 FR 4150 - Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
...; NIOSH-134-B] Update of NIOSH Nanotechnology Strategic Plan for Research and Guidance AGENCY: National... Nanotechnology Strategic Plan for Research and Guidance. SUMMARY: The National Institute for Occupational Safety... NIOSH FY2013-FY2016 nanotechnology strategic plan. This draft strategic plan (Protecting the...
77 FR 8818 - Publication of FY 2011 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-15
... the inventory on the Bureau's Open Government homepage at the following link: http://www.consumerfinance.gov/open/ , specifically at http://www.consumerfinance.gov/wp-content/uploads/2012/01/Appendix-C-FY2011-Inventory-Data-Summary.pdf and http://www.consumerfinance.gov/wp-content/uploads/2012/01/Appendix...
78 FR 23245 - FY2013 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-18
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9789-7] FY2013 Supplemental Funding for Brownfields Revolving... Availability of Funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make... Response, Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan...
77 FR 16030 - FY2012 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-19
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9649-8] FY2012 Supplemental Funding for Brownfields Revolving... availability of funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make... Response, Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan...
76 FR 5778 - Public Availability of the Department of Agriculture FY 2010 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-02
... DEPARTMENT OF AGRICULTURE Public Availability of the Department of Agriculture FY 2010 Service... the Consolidated Appropriations Act of 2010 (Pub. L. 111-117), Department of Agriculture is publishing...-inventories-guidance-11052010.pdf . Department of Agriculture has posted its inventory and a summary of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... NATIONAL ARCHIVES AND RECORDS ADMINISTRATION Public Availability of the National Archives and... Administration. ACTION: Notice of public availability of FY 2011 Service Contract Inventory. SUMMARY: In...), the National Archives and Records Administration (NARA) is publishing this notice to advise the public...
77 FR 24990 - Public Availability of the Department of Labor FY 2011 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Inventory AGENCY: Office of Assistant Secretary for Administration and Management, Department of Labor. ACTION: Notice of Public Availability of FY 2011 Service Contract Inventories. SUMMARY: In accordance... Service Contract Inventory. This inventory provides information on service contract actions over $25,000...
75 FR 75666 - Advanced Placement (AP) Test Fee Program
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-06
... DEPARTMENT OF EDUCATION [CFDA No. 84.330B] Advanced Placement (AP) Test Fee Program AGENCY: Office... AP Test Fee fiscal year (FY) 2011 competition. SUMMARY: On September 1, 2010, we published in the Federal Register (75 FR 53681) a notice inviting applications for the AP Test Fee FY 2011 competition...
78 FR 60268 - Race to the Top-District
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-01
... DEPARTMENT OF EDUCATION Race to the Top--District AGENCY: Office of the Deputy Secretary, Department of Education. ACTION: Notice extending the deadline of the fiscal year (FY) 2013 Race to the Top...) Number: 84.416. SUMMARY: The Secretary is extending the application deadline in the FY 2013 Race to the...
DOT National Transportation Integrated Search
1998-02-01
This report is the fifth annual national review of activities funded under the : Congestion Mitigation and Air Quality Improvement (CMAQ) Program, covering : fiscal year (FY) 1996. It covers the distribution of funding among project : categories, an ...
1991-02-01
FY 1990 ACCOMPLISHMENTS: a. (U) Completed physical functional and operational audit of system, subcomponents and interfaces related to digital...receiver hardware. b. (U) Developed system specification reflecting audit results. c. (U) Established reliability assessment and recommended changes and/or...interoperability testing and demonstrations. d. (U) Updated joint terminal specifications and standards. e. (U) Audited Army/Navy/Air Force terminal designs. f. (U
DOE Office of Scientific and Technical Information (OSTI.GOV)
Core, Gregory Matthew
This report contains a summary of irradiation testing of Fuel Cycle Research and Development (FCRD) Accident Tolerant Fuels Series 1 (ATF 1) experiments performed at Idaho National Laboratory (INL) in FY 2016. ATF 1 irradiation testing work performed in FY 2016 included design, analysis, and fabrication of ATF-1B drop in capsule ATF 1 series experiments and irradiation testing of ATF-1 capsules in the ATR.
2012 statistical summaries : FTA grant assistance programs.
DOT National Transportation Integrated Search
2013-12-01
The 2012 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for : Federal Fiscal Year (FY) 2012. The report covers the following programs: Urbanized Area Formula, Non-urbanized A...
2011 statistical summaries : FTA grant assistance programs.
DOT National Transportation Integrated Search
2013-05-01
The 2011 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2011. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...
2010 statistical summaries : FTA grant assistance programs.
DOT National Transportation Integrated Search
2013-07-01
The 2010 Statistical Summaries provides information about the Federal Transit Administrations (FTA) major financial aid programs for Federal Fiscal Year (FY) 2010. The report covers the following programs: Urbanized Area Formula, Non-urbanized Are...
Reveles, Kelly R; Lawson, Kenneth A; Mortensen, Eric M; Pugh, Mary Jo V; Koeller, Jim M; Argamany, Jacqueline R; Frei, Christopher R
2017-01-01
Prior studies demonstrated marked increases in Clostridium difficile infection (CDI) in the United States (U.S.) in recent years. The objective of this study was to describe the epidemiology of initial and recurrent CDI in a national Veterans Health Administration (VHA) cohort over a 12-year period. This was a retrospective cohort study of all adult VHA beneficiaries with CDI (ICD-9-CM code 008.45) plus a positive CDI stool test between October 1, 2002 and September 30, 2014. Data were obtained from the VA Informatics and Computing Infrastructure. Recurrence was defined as a second ICD-9-CM code plus a new course of CDI therapy following a minimum three-day gap after the initial therapy was completed. CDI incidence and outcomes were presented descriptively and longitudinally. Overall, 30,326 patients met study inclusion criteria. CDI incidence increased from FY 2003 (1.6 per 10,000) to FY 2013 (5.1 per 10,000). Thereafter, CDI incidence decreased through FY 2014 (4.6 per 10,000). A total of 5,011 patients (17%) experienced a first recurrence and, of those, 1,713 (34%) experienced a second recurrence. Recurrence incidence increased 10-fold over the study period, from (0.1 per 10,000) in FY 2003, to (1.0 per 10,000) in FY 2014. Overall, 30-day mortality and median hospital length of stay (LOS) decreased among initial episodes over the study period. Mortality was higher for initial episodes (21%) compared to first recurrences (11%) and second recurrences (7%). Median hospital LOS was longer for first episodes (13 days) compared to first (9 days) and second recurrences (8 days). Initial and recurrent CDI episodes increased among veterans over a 12-year period. Outcomes, such as mortality and hospital LOS improved in recent years; both of these outcomes are worse for initial CDI episodes than recurrent episodes.
ERIC Educational Resources Information Center
Mississippi Band of Choctaw Indians, Philadelphia.
Self-determination for the Choctaw tribal government and its people was reflected in the progress made in program development. Programs in effect during fiscal year (FY) 1973 covered the full range of economic and social needs of the Choctaw people. Designed to complement the progress achieved during FY 1972, the following four developmental…
The Advanced Security Operations Corporation Special Weapons and Tactics Initiative: A Business Plan
2004-12-01
5 Kotler , Philip . (2003). A Framework for Marketing Management (2nd ed.). New Jersey: Pearson Education. 8 teams in Los...www.ojp.usdoj.gov/odp/docs/fy04hsgp_appkit.pdf 5. Kotler , Philip . (2003). A Framework for Marketing Management (2nd ed.). New Jersey: Pearson Education. 6
Biological and Chemical Technologies Research at OIT: Annual Summary Report, FY 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, G.
1998-03-01
The annual summary report presents the fiscal year (FY) 1 997 research activities and accomplishments for the United States Department of Energy (DOE) Biological and Chemical Technologies Research (BCTR) Program. This BCTR program resides within the Office of Industrial Technologies (OIT) of the Office of Energy Efficiency and Renewable Energy (EE). The annual summary report for 1997 (ASR 97) contains the following: program description (including BCTR program mission statement, historical background, relevance, goals and objectives); program structure and organization; selected technical and programmatic highlights for 1 997; detailed descriptions of individual projects; and a listing of program output, including amore » bibliography of published work, patents, and awards arising from work supported by the program.« less
1998 statistical summaries : Federal Transit Administration : grant assistance programs
DOT National Transportation Integrated Search
1999-03-01
The 1998 Statistical Summaries provides information about the Federal Transit Administration's (FTA) major financial aid programs for Federal Fiscal Year (FY) 1998. The report covers the following programs: Urbanized Area Formula, Non-urbanized Area ...
1991-10-28
included as appropriate. 2-1 IMPLEMENTATION DEPENDENCIES The following 185 tests have floating-point type declarations requiring more digits than...SYSTEM.MAX DIGITS : C24113F..Y (20 tests) C? 705F..Y (20 tests) C35706F..Y (20 tests) C35707F..Y (20 tests) C35708F..Y (20 tests) C35802F..Z (21 tests...trademark of Teleoft. TeleGen2m is a trademark of TeleSofL VAX and VMS! are registered trademarks of Digital Equipment Corp. RESTRICTED RIGHTS LEGEND Use
Annual Progress Report FY-82. Volume I.
1982-01-01
Comparison of Binaural Versus 316 Monaural Amplification. (FY-81PI) 2535 Development of Method for Generating 318 Individualized Aural Rehabilitation...Oncology Group. 428 (FY-74 I ) 4116 The Evaluation of Petal Systolic Time Intervals 429 and Beat interval Variation in Fetal heart Rate as Early
1989-01-01
size, weight , power consumption, and radiation hardness, and on software algorithm validity and efficiency. 3. (U) Collection of radar, ctical, and...which have potential to achieve cooling requirements for LWIR sensors with far smaller weight and power penalties. (U) FY1989 Planned Program: o (U...two dollars for every SDI dollar. o (U) Inverted gaili--n arsenide by growing a razor-thin layer of silicon on GaAs and thus cut power loss by two
76 FR 2905 - FY2011 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-18
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9254-1] FY2011 Supplemental Funding for Brownfields Revolving... availability of funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make..., Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan Fund (BCRLF...
75 FR 10793 - FY2010 Supplemental Funding for Brownfields Revolving Loan Fund (RLF) Grantees
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9124-3] FY2010 Supplemental Funding for Brownfields Revolving... Availability of Funds. SUMMARY: EPA's Office of Brownfields and Land Revitalization (OBLR) plans to make..., Compensation and Liability Act (CERCLA), 42 U.S.C. 9604(k)(3). Brownfields Cleanup Revolving Loan Fund (BCRLF...
75 FR 57912 - Boulder Canyon Project-Rate Order No. WAPA-150
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
...-setting Formula and Approval of FY 2011 Base Charge and Rates. SUMMARY: The Deputy Secretary of Energy... existing Boulder Canyon Project (BCP) rate-setting formula and approving the base charge and rates for FY... financial and load data. The existing rate-setting formula is being extended under Rate Order No. WAPA-150...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-10
..., Office of Policy, Planning, Research, and Communication, Institute of Museum and Library Services, 1800 M..., Proposed Collection: Public Libraries Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services.... SUMMARY: The Institute of Museum and Library Services announces the following information collection has...
FY2008-FY2013 SDPBC High School Graduates College Matriculation Summary. Memorandum
ERIC Educational Resources Information Center
Howard, Mark
2014-01-01
The National Student Clearinghouse (NSC) is an independent organization that tracks the postsecondary enrollment and success of students in more than 3,300 colleges and universities nationwide. The School District of Palm Beach County (SDPBC) has contracted with the NSC to provide data on their students to better understand postsecondary patterns…
Oak Ridge National Laboratory Institutional Plan, FY 1995--FY 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-11-01
This report discusses the institutional plan for Oak Ridge National Laboratory for the next five years (1995-2000). Included in this report are the: laboratory director`s statement; laboratory mission, vision, and core competencies; laboratory plan; major laboratory initiatives; scientific and technical programs; critical success factors; summaries of other plans; and resource projections.
DOT National Transportation Integrated Search
2010-05-01
This report presents the regional conformity analysis and recommendation for a finding of conformity for the Hampton Roads 2030 Long Range Transportation Plan (LRTP, or "Plan") and associated Fiscal Year (FY) 2009-2012 Transportation Improvement Prog...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-26
... Skilled Nursing Facilities for FY 2012; Correction AGENCY: Centers for Medicare & Medicaid Services (CMS... Nursing Facilities for FY 2012'' that appeared in the August 8, 2011 Federal Register. DATES: Effective... October 1, 2011. II. Summary of Errors The Addendum to the Skilled Nursing Facility (SNF) Prospective...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
...-0182-02] FY 2010 NIST Center for Neutron Research (NCNR) Comprehensive Grants Program Extension of Due Date for Proposals AGENCY: National Institute of Standards and Technology (NIST), United States Department of Commerce. ACTION: Notice. SUMMARY: NIST publishes this notice to extend the deadline for...
Summary of BISON Development and Validation Activities - NEAMS FY16 Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williamson, R. L.; Pastore, G.; Gamble, K. A.
This summary report contains an overview of work performed under the work package en- titled “FY2016 NEAMS INL-Engineering Scale Fuel Performance (BISON)” A first chapter identifies the specific FY-16 milestones, providing a basic description of the associated work and references to related detailed documentation. Where applicable, a representative technical result is provided. A second chapter summarizes major additional accomplishments, which in- clude: 1) publication of a journal article on solution verification and validation of BISON for LWR fuel, 2) publication of a journal article on 3D Missing Pellet Surface (MPS) analysis of BWR fuel, 3) use of BISON to designmore » a unique 3D MPS validation experiment for future in- stallation in the Halden research reactor, 4) participation in an OECD benchmark on Pellet Clad Mechanical Interaction (PCMI), 5) participation in an OECD benchmark on Reactivity Insertion Accident (RIA) analysis, 6) participation in an OECD activity on uncertainity quantification and sensitivity analysis in nuclear fuel modeling and 7) major improvements to BISON’s fission gas behavior models. A final chapter outlines FY-17 future work.« less
Child Care and Development Fund: Report of State Plans FY 2002-2003.
ERIC Educational Resources Information Center
Administration on Children, Youth, and Families (DHHS), Washington, DC. Child Care Bureau.
The Personal Responsibility and Work Opportunity Reconciliation Act requires each state to submit a biennial plan to implement the Child Care and Development Fund (CCDF). This report summarizes information in the biennial plans submitted for the period October 1, 2001 to September 30, 2003. The analysis includes information from 50 states, the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vaivoda, Alexis
2003-11-01
This report summarizes the project implementation and monitoring of all habitat activities that occurred over Fiscal Year 2002 (FY 02). Some of the objectives in the corresponding statement of work for this contract were not completed within FY 02. A description of the progress during FY 02 and reasoning for deviation from the original tasks and timeline are given. OBJECTIVE 1--Provide coordination of all activities, administrative oversight and assist in project implementation and monitoring activities. Administration oversight and coordination of the habitat statement of work, budget, subcontracts and personnel was provided. OBJECTIVE 2--Develop, coordinate, and implement the Hood River Fishmore » Habitat Protection, Restoration, and Monitoring Plan. The Hood River Fish Habitat Protection, Restoration, and Monitoring Plan was completed in 2000 (Coccoli et al., 2000). This document is utilized for many purposes including: drafting the Watershed Action Plan, ranking projects for funding, and prioritizing projects to target in the future. This document was updated and revised to reflect changes to fish habitat and needs in the Hood River basin based upon other documents and actions taken in the basin. OBJECTIVE 3--Assist Middle Fork Irrigation District in developing an alternative irrigation water source on Evans Creek (Hutson pond and Evans Creek diversion), eliminating the need for irrigation diversion dams which happen to be partial fish barriers. Upon completion, this project will restore 2.5 miles of access for winter steelhead, coho salmon, and resident trout habitat. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02 the final engineering was completed on this project. However, due to a lengthy permitting process and NMFS consultation, this project was inadvertently delayed. Project completion is expected in July 2003. OBJECTIVE 4--Assist the Farmers Irrigation District (FID) in construction and installation of a new fish screen and bypass system on the mainstem Hood River (Farmers Canal). Final engineering and design for the horizontal screen was completed during the winter of 2001. In December 2001 and January 2002, the concrete work was completed and the head gates were mounted. During the spring the secondary head level control gates were installed. In September 2002, the jersey barriers and vortex tubes were installed. These are located upstream of the old drum screen, and are the primary means of dealing with bedload and suspended load from the diversion. The screen surface was also installed in September 2002 and the system accommodated water soon after. Monitoring of these structures in regards to efficiency and possible effects to fish migration is scheduled to occur in spring 2003. The transition from the old canal to the new screen is smooth and currently does not present any problems. The old drum screen is going to remain in place until all the biological and hydrological monitoring is complete to ensure compliance and satisfaction of all agencies involved. OBJECTIVE 5--Assist the East Fork Irrigation District (EFID) in final engineering design and construction of the Central Lateral Canal upgrade and invert siphon. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. During FY 02, a significant portion of the engineering and design work was completed on the EFID Central Lateral Canal upgrade and invert siphon. There were some changes in canal alignment that required further design work and easement acquisition. Time was also spent looking for matching funds and securing a loan by the EFID. Construction initiation is now scheduled for summer 2003. OBJECTIVE 6--Modify and/or eliminate five culverts, three on Baldwin Creek, one on Graham Creek, and one on Evans Creek, which function as barriers to upstream and downstream fish migration. This objective was revised and included in the FY 03 Statement of Work for Project No. 1998-021-00. There are only two culverts on Baldwin Creek that will be eliminated or modified. Work was initiated on the removal of one of these culverts, and the replacement of the other. The landowner was agreeable and NEPA was initiated. The modification/elimination of these culverts is scheduled for FY 04. The culvert on Graham Creek is a county road, and will be addressed as a fish passage barrier by Hood River County. The Evans Creek culvert was prepared for modification in FY 02, however due to a lengthy permitting process the instream work period was missed. This project is on the schedule for the instream work period of 2003. OBJECTIVE 7--Construct riparian fence to stabilize and improve the riparian zone along the East Fork Hood River and tributaries. Two riparian fencing projects were completed on East Fork Hood River tributaries. The first was on Baldwin Creek, and the second was on Shelly Creek.« less
2004-02-01
UNCLASSIFIED − Conducted experiments to determine the usability of general-purpose anomaly detection algorithms to monitor a large, complex military...reaction and detection modules to perform tailored analysis sequences to monitor environmental conditions, health hazards and physiological states...scalability of lab proven anomaly detection techniques for intrusion detection in real world high volume environments. Narrative Title FY 2003
Afghanistan: Narcotics and U.S. Policy
2009-06-18
Defense Appropriation P.L. 110-116 FY2008 Bridge Fund P.L. 110-161 (Division L ) FY2008 Supplemental P.L. 110-252 (Title IX, Chapter 1) Total...Moreau and Sami Yousafzai, with Donatella Lorch, “Flowers of Destruction,” Newsweek, July 14, 2003; Andrew North, “Warlord Tells Police Chief to Go...Gen. Walter L . Sharp, Director of Strategic Plans (J-5), Before the House International Relations Committee, September 23, 2004. 81 House of Commons
RELAP-7 Progress Report. FY-2015 Optimization Activities Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Berry, Ray Alden; Zou, Ling; Andrs, David
2015-09-01
This report summarily documents the optimization activities on RELAP-7 for FY-2015. It includes the migration from the analytical stiffened gas equation of state for both the vapor and liquid phases to accurate and efficient property evaluations for both equilibrium and metastable (nonequilibrium) states using the Spline-Based Table Look-up (SBTL) method with the IAPWS-95 properties for steam and water. It also includes the initiation of realistic closure models based, where appropriate, on the U.S. Nuclear Regulatory Commission’s TRACE code. It also describes an improved entropy viscosity numerical stabilization method for the nonequilibrium two-phase flow model of RELAP-7. For ease of presentationmore » to the reader, the nonequilibrium two-phase flow model used in RELAP-7 is briefly presented, though for detailed explanation the reader is referred to RELAP-7 Theory Manual [R.A. Berry, J.W. Peterson, H. Zhang, R.C. Martineau, H. Zhao, L. Zou, D. Andrs, “RELAP-7 Theory Manual,” Idaho National Laboratory INL/EXT-14-31366(rev. 1), February 2014].« less
Blow, Frederic C.; Ignacio, Rosalinda V.; Ilgen, Mark A.; Austin, Karen L.; Valenstein, Marcia
2012-01-01
Objectives. Using national patient cohorts, we assessed rural–urban differences in suicide rates, risks, and methods in veterans. Methods. We identified all Department of Veterans Affairs (VA) patients in fiscal years 2003 to 2004 (FY03–04) alive at the start of FY04 (n = 5 447 257) and all patients in FY06–07 alive at the start of FY07 (n = 5 709 077). Mortality (FY04–05 and FY07–08) was assessed from National Death Index searches. Census criteria defined rurality. We used proportional hazards regressions to calculate rural–urban differences in risks, controlling for age, gender, psychiatric diagnoses, VA mental health services accessibility, and regional administrative network. Suicide method was categorized as firearms, poisoning, strangulation, or other. Results. Rural patients had higher suicide rates (38.8 vs 31.4/100 000 person-years in FY04–05; 39.6 vs 32.4/100 000 in FY07–08). Rural residence was associated with greater suicide risks (20% greater, FY04–05; 22% greater, FY07–08). Firearm deaths were more common in rural suicides (76.8% vs 61.5% in FY07–08). Conclusions. Rural residence is a suicide risk factor, even after controlling for mental health accessibility. Public health and health system suicide prevention should address risks in rural areas. PMID:22390583
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... Period for Request for Information on the FY 2013-2018 Strategic Plan for the Office of Disease Prevention SUMMARY: The Office of Disease Prevention (ODP), National Institutes of Health (NIH), is amending..., Office of Disease Prevention, National Institutes of Health; phone, 301-496-1508; email, [email protected
FY 1992-1993 RDT&E Descriptive Summaries: DARPA
1991-02-01
combining natural language and user workflow model information. * Determine effectiveness of auditory models as preprocessors for robust speech...for indexing and retrieving design knowledge. * Evaluate ability of message understanding systems to extract crisis -situation data from news wires...energy effects , underwater vehicles, neutrino detection, speech, tailored nuclear weapons, hypervelocity, nanosecond timing, and MAD/RPV. FY 1991 Planned
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1983-08-01
The report includes the analysis of the energy use patterns at the base and the identification and evaluation of energy conservation opportunities. The obtained results indicate that AMMRC energy use can potentially be reduced 42 percent by FY 1985, compared to the FY 1975 energy use baseline.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-24
... fiscal year (FY) 2011. SUMMARY: This Notice announces the Department of Energy (DOE) acceptance of claims... the American Recovery and Reinvestment Act of 2009 (Recovery Act). In addition, Congress provided $10... approximately $24.3 million of Recovery Act funds available for reimbursement in FY 2011, as well as the $10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-06
... Program. This announcement contains the consolidated names and addresses of the award recipients under... Awards, HOPE VI Main Street Grant Program, Fiscal Year (FY) 2011 and 2012 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...
Fermilab Test Beam Facility Annual Report. FY 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brandt, A.
2015-01-01
Fermilab Test Beam Facility (FTBF) operations are summarized for FY 2014. It is one of a series of publications intended to gather information in one place. In this case, the information concerns the individual experiments that ran at FTBF. Each experiment section was prepared by the relevant authors, and was edited for inclusion in this summary.
United States Air Force Statistical Digest, Fiscal Year 1956. Eleventh Edition
1956-09-30
340 •••••••••••••••••• USAF Dental Health Activitiea at USAF In.tallations, Worldwide - FY 1956 ••• USAF Veterinary Animal Origin Food ...Inspection Service Incident to Pro- curement - FY 1956 ••••••••••••••••••••••••• Summary - USAF Veterinary Non-Animal Origin Food Inspection Service Incident...to Procurement - FY 1956 •••••.•••••••• USAF Veterinary Animal Origin Food Inspection Service Incident to Surveillance - FY 1956
1981-01-01
the Position Location Reporting System/Joint Tactical Information Distributlo:; System Hybrid (ADDS) was approved by the Combat and Materiel Developers...Programs program. The establishment of a hybrid testbed will be Initiated in FY 1981 integrating the engint-ciag development models of Position...ad anticipated. 0.110 - This project was Increased by $1999 thousand in FT 1980 to support additional AD work on the hybrid collective protec- tion
2010-08-30
the base budget.41 41 USAAA Report No. A-2009-0188- FFM . 22 Chapter 2. Actions Taken by...Report No. A-2009-0212-FFS, “Requirements for Mobilized Soldiers,” September 17, 2009 Army Audit Agency Report No. A-2009-0188- FFM , “Assessing... FFM , “Assessing Future Base Budget Requirements, Manning Program Evaluation Group (FOUO),” March 3, 2009 32 Army Audit Agency Report No. A-2009
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1975-10-01
Brief summaries are presented of energy-related biomedical and environmental research studies during 1974 and 1975 sponsored by the Tennessee Valley Authority, National Aeronautics and Space Administration, National Institutes of Health, and the National Institute for Occupational Safety and Health. (CH)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
.... ACTION: Notice of technical correction. SUMMARY: On September 20, 2010, HUD posted on http://www.Grants.gov and http://www.hudhre.info its Notice of Funding Availability (NOFA) for HUD's FY2010 Continuum of... http://www.Grants.gov and http://www.hudhre.info a technical correction that corrects Appendix A of the...
Fermilab Testbeam Facility Annual Report – FY 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albrow, M. G.
2016-11-01
This Technical Memorandum (TM) summarizes the Fermilab Test Beam operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the individual experiments that ran at FTBF, which are tabulated. Each experiment section was prepared by the relevant authors, and was edited for inclusion in this summary.
Fiscal Year 1989 Unit Cost Report for the Public Community Colleges of Illinois.
ERIC Educational Resources Information Center
Illinois Community Coll. Board, Springfield.
Fiscal year (FY) 1989 results of the annual unit cost study of the Illinois public community colleges are presented in this report, based on data on course offerings, enrollments, and costs provided by the colleges. After an initial summary overview, data and analyses are presented showing net instructional unit costs for FY 1989 compared with…
Summary of Computer Usage and Inventory of Computer Utilization in Curriculum, FY 1988-89.
ERIC Educational Resources Information Center
Tennessee Univ., Chattanooga. Center of Excellence for Computer Applications.
In addition to data on FY 1988-89, the 12 tables that constitute the major part of this report on computer utilization at the University of Tennessee at Chattanooga (UTC) provide comparisons among the 10 annual inventories that have been conducted, and demonstrate growth patterns over the 10-year period. The first five tables organize data by…
Military Construction and Family Housing Program. Fiscal Year (FY) 2001 Budget Estimates
2000-02-01
Department of the Air Force Military Construction and Family Housing Program Fiscal Year (FY) 2001 Budget Estimates Justification Data...Department of the Air Force Military Construction and Military Family Housing Program Summary Fiscal Year 2001 Appropriation Authorization Request... FISCAL YEAR 2001 (DOLLARS IN THOUSANDS) STATE/COUNTRY INSTALLATION TITLE APPROP REQUEST AUTH REQUEST PAGE INSIDE THE U.S. ALABAMA
FY2017 Electrification Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) funded early stage research & development (R&D) projects that address Batteries and Electrification of the U.S. transportation sector. The VTO Electrification Sub-Program is composed of Electric Drive Technologies, and Grid Integration activities. The Electric Drive Technologies group conducts R&D projects that advance Electric Motors and Power Electronics technologies. The Grid and Charging Infrastructure group conducts R&D projects that advance Grid Modernization and Electric Vehicle Charging technologies. This document presents a brief overview of the Electrification Sub-Program and progress reports for its R&D projects. Eachmore » of the progress reports provide a project overview and highlights of the technical results that were accomplished in FY 2017.« less
ERIC Educational Resources Information Center
Academy for Educational Development, 2007
2007-01-01
An area of particular concern in adolescent literacy is comprehension of informational text: many students can successfully decode words without actually being able to understand the texts they read. As they progress through school, they have to read increasingly complex texts but receive little if any explicit instruction to help them. Beyond the…
Protect and Restore Mill Creek Watershed; Annual Report 2002-2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McRoberts, Heidi
2004-01-01
The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Mill Creek watershed are coordinated with the Nez Perce National Forest. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. During the FY 2002, trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-streammore » crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed. Maintenance to the previously built fence was also completed.« less
2008-08-28
Stitcher -Singleton for providing access to Naval Aviation Student Training Attrition Report archives and for assistance in obtaining related training...2006 period ( Stitcher -Singleton, 2006a) 06-2 for April 2006 to September 2006 period ( Stitcher -Singleton, 2006b) 07-1 for October 2006 to March 2007...period ( Stitcher -Singleton, 2007a) 07-2 for April 2007 to September 2007 period ( Stitcher -Singleton, 2007b) CNATRAINST 1500.4D directs administration
2003-01-01
greater deployment capabilities. The Stryker specific requirements program at Fort Lewis will be completed by the end of the calendar year 2003. This is...USAR and can be found in appendix B, for a complete list for all United States Army MILCON projects for the FYDP fiscal year 2004 through fiscal year...institution in one of its communities. 59 APPENDIX A ACTIVE ARMY FY 2004 --FY 2009 FYDP Funded Fiscal Year Installation Description MCA DD1391 2004 Fort
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1979-12-01
This volume contains summaries of FY-1978 government-sponsored environment and safety research related to energy. Project summaries were collected by Aerospace Corporation under contract with the Department of Energy, Office of Program Coordination, under the Assistant Secretary for Environment. Summaries are arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each agency. Information about the projects is included in the summary listings. This includes the project title, principal investigators, research organization, project number, contract number, supporting organization, funding level ifmore » known, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed by subject index terms that were assigned for computer searching and for generating the printed subject index in Volume IV.« less
Laboratory Directed Research and Development Program FY 2006 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sjoreen, Terrence P
2007-04-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the US Departmental of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, 'Laboratory Directed Research and Development' (April 19, 2006), which establishes DOE's requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2006. The associated FY 2006 ORNL LDRD Self-Assessment (ORNL/PPA-2007/2) provides financial data about themore » FY 2006 projects and an internal evaluation of the program's management process.« less
Sakai, T; Hudson, M; Davis, P; Williams, J
2013-10-01
The current economic environment makes it difficult for academic institutions to maintain academic activities with necessary clinical coverage. Productivity-based faculty compensation is reported to improve clinical work output; however, the impact on academic productivity has not been fully described. An academic anaesthesiology department has used a comprehensive clinical and academic performance-based faculty compensation programme as fiscal year (FY) 2004. Faculty choosing to pursue an academic track can devote up to 80% of their time to non-clinical activities. Payment for this time is 'salary at risk', which is earned through a merit matrix system, which was newly developed to award points for various academic activities. Unclaimed portions of the salary at risk are absorbed into the department budget at the conclusion of the FY. Clinical activities are measured chiefly based on total hours of anaesthetic care. Academic full-time equivalents (FTEs) decreased by 12.0% in FY2005 (FTE of 16.0-14.1) but recovered to the baseline level in FY2006 and remained stable. Clinical FTE also decreased by 6.6% in FY2005 (FTE of 109.1-101.9), then increased in FY2006-FY2010. Increased clinical work output was observed among the clinical and academic faculty members. Each academic faculty member successfully earned their salary at risk in each FY. The annual number of peer-reviewed publications per academic FTE in original research increased from 0.31 (0.18) (FY2001-FY2003) to 0.73 (0.14) (FY2006-FY2011), P=0.024. Integration of clinical and academic performance-based faculty compensation systems is feasible and can be efficacious in a large academic anaesthesiology department.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffnagle, Timothy L.; Hair, Don; Carmichael, Richard W.
2004-07-01
BPA Fish and Wildlife Program Project Number 1998-01-001 provides funding for the Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program. This report satisfies the requirement that an annual report be submitted for FY 2003. The Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Project is designed to rapidly increase numbers of salmon in stocks that are in imminent danger of extirpation. Parr are captured in Catherine Creek, upper Grande Ronde River and Lostine River and reared to adulthood in captivity. Upon maturation, these fish are spawned (within stocks) and their progeny reared to smoltification before being released into themore » natal stream of their parents. This program is co-managed by ODFW, National Marine Fisheries Service, Nez Perce Tribe and Confederated Tribes of the Umatilla Indian Reservation. This report covers activities conducted and provides data analyses for the Grande Ronde Spring Chinook Salmon Captive broodstock Program from 1 January--31 December 2003. Since the fiscal year ends in the middle of the spawning period, an annual report based on calendar year is more logical. This document is the FY 2003 annual report. Detailed information on historic and present population status, project background, goals and objectives, significance to regional programs and relationships to other programs, methods and previous results are available in the 1995-2002 Project Status Report (Hoffnagle et al 2003).« less
Alternative Electrochemical Salt Waste Forms, Summary of FY11-FY12 Results
DOE Office of Scientific and Technical Information (OSTI.GOV)
Riley, Brian J.; Mccloy, John S.; Crum, Jarrod V.
2014-01-17
The Fuel Cycle Research and Development Program, sponsored by the U.S. Department of Energy Office of Nuclear Energy, is currently investigating alternative waste forms for wastes generated from nuclear fuel processing. One such waste results from an electrochemical separations process, called the “Echem” process. The Echem process utilizes a molten KCl-LiCl salt to dissolve the fuel. This process results in a spent salt containing alkali, alkaline earth, lanthanide halides and small quantities of actinide halides, where the primary halide is chloride with a minor iodide fraction. Pacific Northwest National Laboratory (PNNL) is concurrently investigating two candidate waste forms for themore » Echem spent-salt: high-halide minerals (i.e., sodalite and cancrinite) and tellurite (TeO2)-based glasses. Both of these candidates showed promise in fiscal year (FY) 2009 and FY2010 with a simplified nonradioactive simulant of the Echem waste. Further testing was performed on these waste forms in FY2011 and FY2012 to assess the possibility of their use in a sustainable fuel cycle. This report summarizes the combined results from FY2011 and FY2012 efforts.« less
Accelerator/Experiment Operations - FY 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Czarapata, P.; Geer, S.; Geesaman, D.
2014-10-01
This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2014. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2014 MINOS and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MiniBooNE experiment running in the Booster Neutrino Beam (BNB), and the SeaQuest experiment and Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120). Each section was prepared by the relevant authors, and was somewhat edited for inclusion in this summary.
1985-03-01
conceptual framwork , and preliminary validation of IAT concepts. Planned work for FY85, including more extensive validation, is also described. 20...Developments: Required Capabilities .... ......... 10 2-1 IAT Conceptual Framework - FY85 (FEO) ..... ........... 11 2-2 Recursive Nature of Decomposition...approach: 1) Identify needs & requirements for IAT. 2) Develop IAT conceptual framework. 3) Validate IAT methods. 4) Develop applications materials. To
Fermilab Testbeam Facility Annual Report – FY 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albrow, M. G.
2015-11-01
This Technical Memorandum (TM) summarizes the Fermilab Test Beam operations for FY 2015. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the individual experiments that ran at FTBF and are listed in Table TB-1. Each experiment section was prepared by the relevant authors, and was edited for inclusion in this summary.
Fermilab Test Beam Facility Annual Report FY17
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rominsky, M.; Schmidt, E.; Rivera, R.
This Technical Memorandum (TM) summarizes the Fermilab Test Beam operations for FY2017. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the individual experiments that ran at FTBF and are listed in Table 1. Each experiment section was prepared by the relevant authors, and was edited for inclusion in this summary.
Library User Survey, Summary Report FY 1990-FY 1992: Russell Library, Georgia College.
ERIC Educational Resources Information Center
Scott, R. Neil
This report summarizes data from surveys of users at the Georgia College library from 1989 to 1992. Results in the following areas are presented for each fiscal year (i.e., 1990, 1991, and 1992): (1) affiliation with the college and academic major; (2) status (i.e., faculty, staff, student class); (3) whether the library visit was in support of…
NASA/MSFC FY-82 atmospheric processes research review
NASA Technical Reports Server (NTRS)
Turner, R. E. (Compiler)
1982-01-01
The NASA/MSFC FY-82 Atmospheric Processes Research Program was reviewed. The review covered research tasks in the areas of upper atmosphere, global weather, and severe storms and local weather. Also included was research on aviation safety environmental hazards. The research project summaries, in narrative outline form, supplied by the individual investigators together with the agenda and other information about the review are presented.
Executive Summary Report - FY80 Geotechnical Siting Investigations.
1980-11-30
MX siting investigation, geotech- nical summary, prime characterization sites, Rio Grande /Highlands Candidate Siting Province report. TR-26d , 19781...s * Subsurface projectlro of to sul rock limits ab ser i Oelneation of ro-k f o- Geologic high (-7000 !ps -) w- we velocities -Obta r Borings
Acquisition: Direct Care Medical Services Contracts
2004-06-24
System FAR Federal Acquisition Regulation FBA Franchise Business Activity FICA Federal Insurance Contributions Act FISC Fleet Industrial Supply Center...regarding the use of Franchise Business Activity contracts to forward fund appropriations from one fiscal year for work performed in the next fiscal year...2002 to 63 in FY 2003. 3 As discussed in Inspector General of the Department of Defense Report No. D-2003-113, “ Franchise Business Activity Contracts
FY 1999 Annual Self-Evaluation Report of the Pacific Northwest National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Randy R. LaBarge
1999-11-05
This is a report of the Pacific Northwest National Laboratory's (Pacific Northwest's) FY1999 Annual Self-Evaluation Report. This report summarizes our progress toward accomplishment of the critical outcomes, objectives, and performance indicators as delineated in the FY1999 Performance Evaluation & Fee Agreement. It also summarizes our analysis of the results of Pacific Northwest's Division and Directorate annual self-assessments, and the implementation of our key operational improvement initiatives. Together, these provide an indication of how well we have used our Integrated Assessment processes to identify and plan improvements for FY2000. As you review the report you will find areas of significantly positivemore » progress; you will also note areas where I believe the Laboratory could make improvements. Overall, however, I believe you will be quite pleased to note that we have maintained, or exceeded, the high standards of performance we have set for the Laboratory.« less
2nd Quarter Transportation Report FY 2014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory, L.
2014-07-01
This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the second quarter of fiscal year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which includemore » the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet (ft3) generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.« less
Summaries of FY 1980 research in the chemical sciences
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1980-09-01
Brief summaries are given of research programs being pursued by DOE laboratories and offsite facilities in the fields of photochemical and radiation sciences, chemical physics, atomic physics, chemical energy, separations, analysis, and chemical engineering sciences. No actual data is given. Indexes of topics, offsite institutions, and investigators are included. (DLC)
1999 LDRD Laboratory Directed Research and Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rita Spencer; Kyle Wheeler
This is the FY 1999 Progress Report for the Laboratory Directed Research and Development (LDRD) Program at Los Alamos National Laboratory. It gives an overview of the LDRD Program, summarizes work done on individual research projects, relates the projects to major Laboratory program sponsors, and provides an index to the principal investigators. Project summaries are grouped by their LDRD component: Competency Development, Program Development, and Individual Projects. Within each component, they are further grouped into nine technical categories: (1) materials science, (2) chemistry, (3) mathematics and computational science, (4) atomic, molecular, optical, and plasma physics, fluids, and particle beams, (5)more » engineering science, (6) instrumentation and diagnostics, (7) geoscience, space science, and astrophysics, (8) nuclear and particle physics, and (9) bioscience.« less
Hydrologic Resources Management Program and Underground Test Area Project FY 2006 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Culham, H W; Eaton, G F; Genetti, V
2008-04-08
This report describes FY 2006 technical studies conducted by the Chemical Biology and Nuclear Science Division (CBND) at Lawrence Livermore National Laboratory (LLNL) in support of the Hydrologic Resources Management Program (HRMP) and the Underground Test Area Project (UGTA). These programs are administered by the U.S. Department of Energy, National Nuclear Security Administration, Nevada Site Office (NNSA/NSO) through the Defense Programs and Environmental Restoration Divisions, respectively. HRMP-sponsored work is directed toward the responsible management of the natural resources at the Nevada Test Site (NTS), enabling its continued use as a staging area for strategic operations in support of national security.more » UGTA-funded work emphasizes the development of an integrated set of groundwater flow and contaminant transport models to predict the extent of radionuclide migration from underground nuclear testing areas at the NTS. The report is organized on a topical basis and contains four chapters that highlight technical work products produced by CBND. However, it is important to recognize that most of this work involves collaborative partnerships with the other HRMP and UGTA contract organizations. These groups include the Energy and Environment Directorate at LLNL (LLNL-E&E), Los Alamos National Laboratory (LANL), the Desert Research Institute (DRI), the U.S. Geological Survey (USGS), Stoller-Navarro Joint Venture (SNJV), and National Security Technologies (NSTec). Chapter 1 is a summary of FY 2006 sampling efforts at near-field 'hot' wells at the NTS, and presents new chemical and isotopic data for groundwater samples from four near-field wells. These include PM-2 and U-20n PS 1DDh (CHESHIRE), UE-7ns (BOURBON), and U-19v PS No.1ds (ALMENDRO). Chapter 2 is a summary of the results of chemical and isotopic measurements of groundwater samples from three UGTA environmental monitoring wells. These wells are: ER-12-4 and U12S located in Area 12 on Rainier Mesa and USGS HGH No.2 WW2 located in Yucca Flat. In addition, three springs were sampled White Rock Spring and Captain Jack Spring in Area 12 on Rainier Mesa and Topopah Spring in Area 29. Chapter 3 is a compilation of existing noble gas data that has been reviewed and edited to remove inconsistencies in presentation of total vs. single isotope noble gas values reported in the previous HRMP and UGTA progress reports. Chapter 4 is a summary of the results of batch sorption and desorption experiments performed to determine the distribution coefficients (Kd) of Pu(IV), Np(V), U(VI), Cs and Sr to zeolitized tuff (tuff confining unit, TCU) and carbonate (lower carbonate aquifer, LCA) rocks in synthetic NTS groundwater Chapter 5 is a summary of the results of a series of flow-cell experiments performed to examine Np(V) and Pu(V) sorption to and desorption from goethite. Np and Pu desorption occur at a faster rate and to a greater extent than previously reported. In addition, oxidation changes occurred with the Pu whereby the surface-sorbed Pu(IV) was reoxidized to aqueous Pu(V) during desorption.« less
Annual Progress Report (Fiscal Year 1978) of the Clinical Investigation Service
1978-01-01
FY-78 0). 2521 Reaction Times of Stutterers and Nonstutterers (FY-78 0). 2522 ^fonaural Versus Binaural Amplification for Hearing Impaired...4113 Cooperative Gynecoloeic-Oncolosv Croup (FY-72 0). 401 4116 The Evaluation of Fetal Systolic Time Intervals and 402 Beat to Beat ...wmmm mmnv r-T" IÜP WORK UNIT NUMBER: 2522 TITLE; Monaural Versus Binaural Amplification for Hearing Impaired Listeners INVESTIGATORS
1982-02-01
Defense (BHD) Advanced Technology Program is a broadly based rsearch and development effort designed to exploit new and emerging technologies...11-363 DK13 NON -COMMUNICATIONS ELECTRONIC COUNTERMEASURES SYSTEMS .............................. .11-368 DK14 EXPENDABLE JAMMERS...NAVSTAR GLOBAL POSITIONING SYSTEMS (GPS) USER EQUIPMENT .................................. 111-366 DEFENSEWIDE MISSION SUPPORT 6.37.38.A NON -SYSTEMS
FY2013 Energy Storage R&D Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-02-01
The FY 2013 Progress Report for Energy Storage R&D focuses on advancing the development of batteries to enable a large market penetration of hybrid and electric vehicles. Program targets focus on overcoming technical barriers to enable market success including: (1) significantly reducing battery cost, (2) increasing battery performance (power, energy, durability), (3) reducing battery weight & volume, and (4) increasing battery tolerance to abusive conditions such as short circuit, overcharge, and crush.
2007-07-01
Systems , Boeing-led Airborne Laser Team Actively Tracks Airborne Target, Compensates for Atmospheric Turbulence and Fires Sur- rogate High-Energy Laser...7100 System Requirements Analysis and Technological Support for the Ballistic Missile Defense System (BMDS) FY07 Progress Report By...Office of Management and Budget , Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2. REPORT DATE July
Laboratory Directed Research and Development FY2008 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kammeraad, J E; Jackson, K J; Sketchley, J A
The Laboratory Directed Research and Development (LDRD) Program, authorized by Congress in 1991 and administered by the Institutional Science and Technology Office at Lawrence Livermore, is our primary means for pursuing innovative, long-term, high-risk, and potentially high-payoff research that supports the full spectrum of national security interests encompassed by the missions of the Laboratory, the Department of Energy, and National Nuclear Security Administration. The accomplishments described in this annual report demonstrate the strong alignment of the LDRD portfolio with these missions and contribute to the Laboratory's success in meeting its goals. The LDRD budget of $91.5 million for fiscal yearmore » 2008 sponsored 176 projects. These projects were selected through an extensive peer-review process to ensure the highest scientific quality and mission relevance. Each year, the number of deserving proposals far exceeds the funding available, making the selection a tough one indeed. Our ongoing investments in LDRD have reaped long-term rewards for the Laboratory and the nation. Many Laboratory programs trace their roots to research thrusts that began several years ago under LDRD sponsorship. In addition, many LDRD projects contribute to more than one mission area, leveraging the Laboratory's multidisciplinary team approach to science and technology. Safeguarding the nation from terrorist activity and the proliferation of weapons of mass destruction will be an enduring mission of this Laboratory, for which LDRD will continue to play a vital role. The LDRD Program is a success story. Our projects continue to win national recognition for excellence through prestigious awards, papers published in peer-reviewed journals, and patents granted. With its reputation for sponsoring innovative projects, the LDRD Program is also a major vehicle for attracting and retaining the best and the brightest technical staff and for establishing collaborations with universities, industry, and other scientific and research institutions. By keeping the Laboratory at the forefront of science and technology, the LDRD Program enables us to meet our mission challenges, especially those of our ever-evolving national security mission. The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2008 (FY08) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: A broad description of the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY08, and a list of publications that resulted from the research in FY08. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.« less
Sales of Fossil Fuels Produced from Federal and Indian Lands, FY 2003 through FY 2014
2015-01-01
The U.S. Energy Information Administration estimates that total sales of fossil fuels produced from Federal and Indian Lands increased in fiscal year 2014 compared to fiscal year 2013. Production of crude oil increased 7%, natural gas production declined 7%, natural gas plant liquids production increased by 8%, and coal production increased slightly. Detailed tables and maps of production, by State, are contained in the report. EIA’s estimates are based on data provided by the U.S. Department of the Interior’s Office of Natural Resources Revenue.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory, Louis
This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. This report summarizes the 1st quarter of fiscal year (FY) 2017 low-level radioactive waste (LLW), mixed low-level radioactive waste (MLLW) and classified non-radioactive (CNR) shipments. There were no shipments sent for offsite treatment from a NNSS facility and returned to the NNSS this quarter of FY2017.
Report: Congressional Request on Funding Needs for Non-Federal Superfund Sites
Report #2004-P-00001, January 7, 2004. During FY 2003, limited funding prevented EPA from beginning construction at all sites or providing additional funds needed to address sites in a manner believed necessary by regional officials.
DOT National Transportation Integrated Search
2003-01-01
In January 1996, the Secretary of Transportation set a goal of deploying the integrated metropolitan Intelligent Transportation System (ITS) infrastructure in 75 of the nation's largest metropolitan areas by 2005. Using data from surveys administered...
Enterprise Workplan for FY2002-2003
DOT National Transportation Integrated Search
2002-11-01
The ENTERPRISE Program is a pooled-fund with member agencies in the United States, Canada, and the Netherlands. Its main purpose is to use the pooled resources of its members, private sector partners and the United States federal government to develo...
Highlands County transit development plan : (FY 2003/04-2007/08)
DOT National Transportation Integrated Search
2002-07-01
To plan for a public transportation system, it is necessary to gain an understanding of the environment within which the system is operating. The following aspects are examined in this report: Demographics; public involvement; existing transportation...
National Drug Control Strategy. FY 2009 Budget Summary
ERIC Educational Resources Information Center
The White House, 2008
2008-01-01
The National Drug Control Budget Summary identifies resources and performance indicators for programs within the Executive Branch that are integral to the President's National Drug Control Strategy. The Strategy, which is the Administration's plan for reducing drug use and availability, is based on three pillars: (1) Stopping Use Before It Starts,…
Laboratory Directed Research and Development Program Assessment for FY 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hatton, Diane; Barkigia, K.; Giacalone, P.
2016-03-01
This report provides an overview of the BNL LDRD program and a summary of the management processes, project peer review, a financial overview, and the relation of the portfolio of LDRD projects to BNL's mission, initiatives, and strategic plan. Also included are a summary of success indicators and a self-assessment.
2016-11-01
in the FY2017 NDAA Congressional Research Service Summary During the lame duck session, the 114th Congress is expected to consider various...the lame duck session beginning in November is expected to address the NDAA conference report. Security cooperation provisions in the conference report...U.S. security assistance authorities, see Defense Security Cooperation Agency (DSCA), Defense Institute of Security Cooperation Studies , “Chapter 2
1982-02-01
11-17 TACTICAL PROGRAMS 2.37.24.A HEAVY ANTITAIg/ASSAULT WEAPON SYSTEM (TOW...AIRBORNE,4) DIO SYSTEM (SINCGARS)................................ 11-328 6.37.47.A SOLDIER SUPPORT/SURVIVABILITY...enhanced illumination over the current 81mm mortar. The current smoke cartridges for the 81mm mortar and 4.2" battalion heavy mortar, in use since the
Amended FY 1988/1989 Biennial Budget Justification of Estimates Submitted to Congress
1988-02-01
will be installed in order to provide privacy for network data traffic. - Distributed systems technology will continue to be explored, including...techniques and geophysical and satellite data bases to make relevant information rapidly available to the ".fi /./ P ... . C / AMENDED FY 1988/1989...semantic model of available functions and data , %. AMENDED FV 1988/1989 BIENNIAL BUDGET RDT&E DESCRIPTIVE SUMMARY Program Element: fQ1Q0j, Title
NASA Technical Reports Server (NTRS)
1979-01-01
Significant acomplishments, current focus of work, plans for FY-80, and recommendations for new research are outlined for 36 research projects proposed for technical monitoring by the Atmospheric Sciences Division at Marshall Space Flight Center. Topics of the investigations, which were reviewed at a two-day meeting, relate to cloud physics, atmospheric electricity, and mesoscale/storm dynamics.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brady Raap, Michaele C.; Lyons, Jennifer A.; Collins, Brian A.
This report documents the FY13 efforts to enhance a dataset of spent nuclear fuel isotopic composition data for use in developing intrinsic signatures for nuclear forensics. A review and collection of data from the open literature was performed in FY10. In FY11, the Spent Fuel COMPOsition (SFCOMPO) excel-based dataset for nuclear forensics (NF), SFCOMPO/NF was established and measured data for graphite production reactors, Boiling Water Reactors (BWRs) and Pressurized Water Reactors (PWRs) were added to the dataset and expanded to include a consistent set of data simulated by calculations. A test was performed to determine whether the SFCOMPO/NF dataset willmore » be useful for the analysis and identification of reactor types from isotopic ratios observed in interdicted samples.« less
1981-01-19
a " high -low" mix of high performance ...meet the common threat. 86 Considerable progress is being made. Last year, Japanese ships and aircraft performed very capably in a joint naval exercise... high school graduates, however, does not mean that a high school diploma is necessarily a predictor of on-the-job performance in the military.
2008 Federal Energy Management Program (FEMP) Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tremper, C.
2009-07-01
This report assesses the market for Federal Energy Management Program (FEMP) services as it existed in FY 2008. It discusses Federal energy management goal progress in FY 2008, and examines the environment in which agencies implemented energy management projects over the last three years. The report also discusses some recent events that will increase the market for FEMP services, and outlines FEMP's major strategies to address these changes in FY 2009 and beyond.
FY 1996 solid waste integrated life-cycle forecast characteristics summary. Volumes 1 and 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Templeton, K.J.
1996-05-23
For the past six years, a waste volume forecast has been collected annually from onsite and offsite generators that currently ship or are planning to ship solid waste to the Westinghouse Hanford Company`s Central Waste Complex (CWC). This document provides a description of the physical waste forms, hazardous waste constituents, and radionuclides of the waste expected to be shipped to the CWC from 1996 through the remaining life cycle of the Hanford Site (assumed to extend to 2070). In previous years, forecast data has been reported for a 30-year time period; however, the life-cycle approach was adopted this year tomore » maintain consistency with FY 1996 Multi-Year Program Plans. This document is a companion report to two previous reports: the more detailed report on waste volumes, WHC-EP-0900, FY1996 Solid Waste Integrated Life-Cycle Forecast Volume Summary and the report on expected containers, WHC-EP-0903, FY1996 Solid Waste Integrated Life-Cycle Forecast Container Summary. All three documents are based on data gathered during the FY 1995 data call and verified as of January, 1996. These documents are intended to be used in conjunction with other solid waste planning documents as references for short and long-term planning of the WHC Solid Waste Disposal Division`s treatment, storage, and disposal activities over the next several decades. This document focuses on two main characteristics: the physical waste forms and hazardous waste constituents of low-level mixed waste (LLMW) and transuranic waste (both non-mixed and mixed) (TRU(M)). The major generators for each waste category and waste characteristic are also discussed. The characteristics of low-level waste (LLW) are described in Appendix A. In addition, information on radionuclides present in the waste is provided in Appendix B. The FY 1996 forecast data indicate that about 100,900 cubic meters of LLMW and TRU(M) waste is expected to be received at the CWC over the remaining life cycle of the site. Based on ranges provided by the waste generators, this baseline volume could fluctuate between a minimum of about 59,720 cubic meters and a maximum of about 152,170 cubic meters. The range is primarily due to uncertainties associated with the Tank Waste Remediation System (TWRS) program, including uncertainties regarding retrieval of long-length equipment, scheduling, and tank retrieval technologies.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gregory, Louis
2014-09-20
This report satisfies the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) commitment to prepare a quarterly summary report of radioactive waste shipments to the Nevada National Security Site (NNSS) Radioactive Waste Management Complex (RWMC) at Area 5. There were no shipments sent for offsite treatment and returned to the NNSS this quarter. This report summarizes the 3rd quarter of Fiscal Year (FY) 2014 low-level radioactive waste (LLW) and mixed low-level radioactive waste (MLLW) shipments. This report also includes annual summaries for FY 2014 in Tables 4 and 5. Tabular summaries are provided which includemore » the following: Sources of and carriers for LLW and MLLW shipments to and from the NNSS; Number and external volume of LLW and MLLW shipments; Highway routes used by carriers; and Incident/accident data applicable to LLW and MLLW shipments. In this report shipments are accounted for upon arrival at the NNSS, while disposal volumes are accounted for upon waste burial. The disposal volumes presented in this report do not include minor volumes of non-radioactive materials that were approved for disposal. Volume reports showing cubic feet generated using the Low-Level Waste Information System may vary slightly due to differing rounding conventions.« less
Research and Technology Objectives and Plans Summary (RTOPS)
NASA Technical Reports Server (NTRS)
1977-01-01
The NASA Research and Technology program for FY 1978 is represented by this compilation of the 'Summary' portions of each of the Research and Technology Objectives and Plans (RTOPS). The RTOP Summary is designed to facilitate communication and coordination among concerned technical personnel in government, in industry, and in universities. The first section contains citations and abstracts of the RTOPs. Following this section are four indexes: Subject, Technical Monitor, Responsible NASA Organization, and RTOP Number.
Transportation Research and Analysis Computing Center (TRACC) Year 6 Quarter 4 Progress Report
DOT National Transportation Integrated Search
2013-03-01
Argonne National Laboratory initiated a FY2006-FY2009 multi-year program with the US Department of Transportation (USDOT) on October 1, 2006, to establish the Transportation Research and Analysis Computing Center (TRACC). As part of the TRACC project...
1982-02-01
AND DOCTRINE COHAND (TRADOC) STUDIES AND ANALYSES .................. 111-394 6.52.01.A AVIATION ENGINEERING FLIGHT ACTIVITY...nerve agents. These projects are designed to: (a) define the link between acetylcholine receptor stimulation and red blood cell changes, (b) study ...a vigorous program of investi- gations In new ceramics and composite materials for armaments ground vehicles and aircraft. One study advanced nuclear
Director, Operational Test and Evaluation Report FY
1989-01-19
FIRST QUARTER, FY89 ........... VII-I GLOSSARY OF ACRONYMS ....................................... G -1 0 0 0 * vii "* PART I DOT&E ACTIVITY SUMMARY AAND...ouiteriawere egoiandtion w oit e form sisted of the approved air threat against ahecriteria wer expanded to pr vide ora g fruntsiltdnce iog- more...COMMUNICATIONS TERMINAL-- ~~AN/TRC-179(V)1 ,. S(FORCE-MOBILE) MANPACK P/O AN/GRC-215 GENERATOR SET PU-794/ G (MOD) * COMMUNICATIONS TERMINAL AN/GRC-215 AN
Accelerator/Experiment Operations - FY 2016
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blake, A.; Convery, M.; Geer, S.
2016-10-01
This Technical Memorandum summarizes the Fermilab accelerator and experiment operations for FY 2016. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2016 NOvA, MINOS+ and MINERvA experiments using the Main Injector Neutrino Beam (NuMI), the MicroBooNE experiment and the activities in the SciBooNE Hall using the Booster Neutrino Beam (BNB), and the SeaQuest experiment, LArIAT experiment and Meson Test Beam activities in the 120 GeV external switchyard beam (SY120). Each section was prepared by the relevant authors, and was then edited for inclusion inmore » this summary.« less
Gitterman, Daniel P; Langford, W Scott; Hay, William W
2018-03-01
In this article, we examine the status of the National Institutes of Health (NIH) pediatric research portfolio between start of federal fiscal year (FY) 1992 and end of FY 2015. The NIH experienced the greatest mean annual growth rate during the "doubling era" (FY 1998-2003): both the NIH budget (13.5%) and pediatric research portfolios (11.5%) increased annually by double digits. However, in the "postdoubling" era (FY 2004-2009), both the NIH (2.0%) and pediatric (-0.2%) mean annual growth rates decreased dramatically. In the most recent era (FY 2010-2015), the NIH mean annual growth rate has been flat (-0.1%) and pediatric research funding has posted very modest gains (3.5%) without accounting for 1-time increases under the 2009 American Recovery and Reinvestment Act. We offer recommendations to protect against further erosion of the pediatric research portfolio because continuation of these trends will have a negative effect on the health of children during their childhood and as adults. As capacity to conduct basic and applied research is further constrained, it will be a challenge for pediatric researchers to do more with less and less.
FY 2014 Pollution Prevention Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2012 Pollution Prevention Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2013 Pollution Prevention Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2011 Pollution Prevention Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
DOT National Transportation Integrated Search
2004-12-01
House Report 108-243 (2003) accompanying the FY 2004 Department of Transportation : Appropriations Act requested the U.S. Department of Transportation (DOT) to prepare a : report identifying the impediments to the formation of large, capital-intensiv...
FY 2014 Source Reduction Assistance Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2010 Source Reduction Assistance Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2013 Source Reduction Assistance Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2012 Source Reduction Assistance Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2011 Source Reduction Assistance Grant Results Summary
The Pollution Prevention Program reports the environmental results of grants. These grants produce annual environmental results in pounds of hazardous materials reduced, BTUs of energy, water and dollars saved.
FY 2012 Lightweight Materials Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warren, David C.
2013-04-15
The FY 2012 Annual Progress Report for Lightweight Materials provides a detailed description of the activities and technical accomplishments which focuses on the development and validation of advanced materials and manufacturing technologies to significantly reduce light and heavy duty vehicle weight without compromising other attributes such as safety, performance, recyclability, and cost.
MULTIPLE PROJECTIONS SYSTEM (MPS): USER'S MANUAL VERSION 2.0
The document is a user's manual for Multiple Projections System (MPS) Version 2.0, based on the 3% reasonable further progress (RFP) tracking system that was developed in FY92/FY93. The 3% RFP tracking system is a Windows application, and enhancements to convert the 3% RFP track...
NASA Technical Reports Server (NTRS)
Grindle, Laurie; Hackenberg, Davis
2016-01-01
This presentation gives insight into the research activities and efforts being executed in order to integrate unmanned aircraft systems into the national airspace system. This briefing is to inform others of the UAS-NAS FY16 progress and future directions.
1983-02-01
s.,ccesstully modeled to enhance future computer design simulations; (2) a new methodology for conduc*n dynamic analysis of vehicle mechanics was...to prelminary design methodology for tilt rotors, advancing blade concepts configuration helicopters, and compound helicopters in conjunction with...feasibility of low-level personnel parachutes has been demon- strated. A study was begun to design a free-fall water contalner. An experimental program to
FY 2014 LDRD Annual Report Project Summaries
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tomchak, Dena
The FY 2014 Laboratory Directed Research and Development (LDRD) Annual Report is a compendium of the diverse research performed to develop and ensure the INL's technical capabilities can support future DOE missions and national research priorities. LDRD is essential to INL - it provides a means for the laboratory to pursue novel scientific and engineering research in areas that are deemed too basic or risky for programmatic investments. This research enahnces technical capabilities at the laboratory, providing scientific and engineering staff with opportunities for skill building and partnership development.
Aviation System Analysis Capability Quick Response System Report
NASA Technical Reports Server (NTRS)
Roberts, Eileen; Villani, James A.; Ritter, Paul
1998-01-01
The purpose of this document is to present the additions and modifications made to the Aviation System Analysis Capability (ASAC) Quick Response System (QRS) in FY 1997 in support of the ASAC ORS development effort. This document contains an overview of the project background and scope and defines the QRS. The document also presents an overview of the Logistics Management Institute (LMI) facility that supports the QRS, and it includes a summary of the planned additions to the QRS in FY 1998. The document has five appendices.
Advanced Fuels Campaign FY 2015 Accomplishments Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Braase, Lori Ann; Carmack, William Jonathan
2015-10-29
The mission of the Advanced Fuels Campaign (AFC) is to perform research, development, and demonstration (RD&D) activities for advanced fuel forms (including cladding) to enhance the performance and safety of the nation’s current and future reactors; enhance proliferation resistance of nuclear fuel; effectively utilize nuclear energy resources; and address the longer-term waste management challenges. This report is a compilation of technical accomplishment summaries for FY-15. Emphasis is on advanced accident-tolerant LWR fuel systems, advanced transmutation fuels technologies, and capability development.
NASA's Microgravity Technology Report, 1996: Summary of Activities
NASA Technical Reports Server (NTRS)
Kierk, Isabella
1996-01-01
This report covers technology development and technology transfer activities within the Microgravity Science Research Programs during FY 1996. It also describes the recent major tasks under the Advanced Technology Development (ATD) Program and identifies current technology requirements. This document is consistent with NASA,s Enteprise for the Human Exploration and development of Space (HEDS) Strategic Plan. This annual update reflects changes in the Microgravity Science Research Program's new technology activities and requirements. Appendix A. FY 1996 Advanced Technology Development. Program and Project Descriptions. Appendix B. Technology Development.
Spacelab cost reduction alternatives study. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1976-01-01
Alternative approaches to payload operations planning and control and flight crew training are defined for spacelab payloads with the goal of: lowering FY77 and FY 78 costs for new starts; lowering costs to achieve Spacelab operational capability; and minimizing the cost per Spacelab flight. These alternatives attempt to minimize duplication of hardware, software, and personnel, and the investment in supporting facility and equipment. Of particular importance is the possible reduction of equipment, software, and manpower resources such as comtational systems, trainers, and simulators.
ARSENIC PARTITIONING TO IRON OXIDES AND SULFIDES: LOCAL ENVIRONMENT AND OXIDATION STATE
his document summarizes research activities conducted at the Advanced Photon Source at Argonne National Laboratory, Argonne, IL during FY2003. The analytical data collected using X-ray absorption spectroscopy was used to evaluated the chemical speciation of arsenic associated wi...
Annual Progress Report (FY-80) Department of Clinical Investigation.
1980-09-30
Reiter’s Syndrome ) was 17.6% in this population 5/34). Publications: Joseph T. Tesar, -M, Paul Killian MD, David Strong PlhD et al: Acute anterior uveitis...I12 .tate it Pota.sium Balance in the AuilL Acute Leukemic ratient. (FY-78 F) 1127 Characterization and Response to Therapy in- Mild Essential Hyper...Medical Treatment of Amenorrhea-Galactorrhea Syndrome with Vitamin 66 B6 (Pyridoxine). (FY-77 SP I) 1363 Effect of T3 and rT3 on Plasma Cyclic
The economic cost of using restraint and the value added by restraint reduction or elimination.
Lebel, Janice; Goldstein, Robert
2005-09-01
The purpose of this study was to calculate the economic cost of using restraint on one adolescent inpatient service and to examine the effect of an initiative to reduce or eliminate the use of restraint after it was implemented. A detailed process-task analysis of mechanical, physical, and medication-based restraint was conducted in accordance with state and federal restraint requirements. Facility restraint data were collected, verified, and analyzed. A model was developed to determine the cost and duration of an average episode for each type of restraint. Staff time allocated to restraint activities and medication costs were computed. Calculation of the cost of restraint was restricted to staff and medication costs. Aggregate costs of restraint use and staff-related costs for one full year before the restraint reduction initiative (FY 2000) and one full year after the initiative (FY 2003) were calculated. Outcome, discharge, and recidivism data were analyzed. A comparison of the FY 2000 data with the FY 2003 data showed that the adolescent inpatient service's aggregate use of restraint decreased from 3,991 episodes to 373 episodes (91 percent), which was associated with a reduction in the cost of restraint from $1,446,740 to $117,036 (a 92 percent reduction). In addition, sick time, staff turnover and replacement costs, workers' compensation, injuries to adolescents and staff, and recidivism decreased. Adolescent Global Assessment of Functioning scores at discharge significantly improved. Implementation of a restraint reduction initiative was associated with a reduction in the use of restraint, staff time devoted to restraint, and staff-related costs. This shift appears to have contributed to better outcomes for adolescents, fewer injuries to adolescents and staff, and lower staff turnover. The initiative may have enhanced adolescent treatment and work conditions for staff.
ORNLs Laboratory Directed Research and Development Program FY 2009 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2010-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2009. The associated FY 2009 ORNL LDRD Self-Assessment (ORNL/PPA-2010/2) provides financial data andmore » an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2014-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2013. The associated FY 2013 ORNL LDRD Self-Assessment (ORNL/PPA-2014/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2008 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2009-03-01
The Oak Ridge National Laboratory (ORNL) Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries all ORNL LDRD research activities supported during FY 2008. The associated FY 2008 ORNL LDRD Self-Assessment (ORNL/PPA-2008/2) provides financial data and anmore » internal evaluation of the program’s management process.« less
ORNLs Laboratory Directed Research and Development Program FY 2012 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
2013-03-01
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the US Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2012. The associated FY 2012 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOT National Transportation Integrated Search
2008-01-01
The Midwest States Accelerated Pavement Testing Pooled Fund Program, financed by the highway departments : of Missouri, Iowa, Kansas and Nebraska, has supported an accelerated pavement testing (APT) project to compare : the performance of stabilized ...
Service and Methods Demonstrations Program Summary Report
DOT National Transportation Integrated Search
1981-12-01
This report summarizes the activities and accomplishments of the UMTA Service and Methods Demonstrations Program for FY 1979, 1980, and 1981. Overall program objectives, current activities, and future directions are briefly described. Current demonst...
75 FR 26918 - Siuslaw Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-13
... Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The Siuslaw Resource Advisory Committee will meet in Corvallis, OR. The purpose of the meeting is to Review RAC FY10...
Banks Lake Fishery Evaluation Annual Report 2002-2003.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polacek, Matt; Knuttgen, Kamia; Shipley, Rochelle
2003-11-01
The Washington Department of Fish and Wildlife implemented the Banks Lake Fishery Evaluation Project (BLFEP) in September 2001 with funds from the Bonneville Power Administration. Fiscal Year (FY) 2001 of the BLFEP was used to gather historic information, establish methods and protocols, collect limnology data, and conduct the first seasonal fish surveys. FY 2002 was used to continue seasonal fish and lakewide creel surveys and adjust methods and protocols as needed. Water quality parameters were collected monthly from February to May and bi-monthly from June to August. Banks Lake water temperatures began to increase in April and stratification was apparentmore » by June at all 3 limnology collection sites. By late August, the thermocline had dropped to nearly 20 meters deep, with 16-17 C temperatures throughout the epilimnion. Dissolved oxygen levels were generally above 10 mg/L until August when dissolved oxygen dropped near or below 5 mg/L below 20-meters deep. Secchi depths ranged from 2.5-8 meters and varied by location and date. Nearshore and offshore fish surveys were conducted in October 2002 and May and July 2003 using boat electrofishing, fyke net, gill net, and hydroacoustic surveys. Yellow Perch Perca flavescens (32 %) and cottid spp. (22 %) dominated the nearshore species composition in October; however, by May yellow perch (12 %) were the third most common species followed by smallmouth bass Micropterous dolomieui (34 %) and lake whitefish Coregonus clupeaformis (14 %). Lake whitefish dominated the offshore catch during October (78 %) and May (81 %). Fish diet analysis indicated that juvenile fishes consumed primarily insects and zooplankton, while adult piscivores consumed cottids spp. and yellow perch most frequently. For FY 2002, the following creel statistics are comprehensive through August 31, 2003. The highest angling pressure occurred in June 2003, when anglers were primarily targeting walleye and smallmouth bass. Boat anglers utilized Steamboat State Park more frequently than any other boat ramp on Banks Lake. Shore anglers used the rock jetty at Coulee City Park 76 % of the time, with highest use occurring from November through April. An estimated total of 11,915 ({+-}140 SD) smallmouth bass, 6,412 ({+-}59 SD) walleye, 5,470 ({+-}260 SD) rainbow trout, and 1,949 ({+-}118 SD) yellow perch were harvested from Banks Lake in FY 2002. Only 3 kokanee were reported in the catch during the FY 2002 creel survey. In the future, data from the seasonal surveys and creel will be used to identify potential factors that may limit the production and harvest of kokanee, rainbow trout, and various spiny-rayed fishes in Banks Lake. The limiting factors that will be examined consist of: abiotic factors including water temperature, dissolved oxygen levels, habitat, exploitation and entrainment; and biotic factors including food limitation and predation. The BLFEP will also evaluate the success of several rearing and stocking strategies for hatchery kokanee in Banks Lake.« less
Venus Data Analysis Program: Directory of Research Projects (1993-1994)
NASA Technical Reports Server (NTRS)
1994-01-01
This directory provides information about the scientific investigations funded by the NASA Venus Data Analysis Program (VDAP) during fiscal year 1993. The VDAP Directory consists of summary sheets from the proposals that were selected by NASA for funding in FY 93. Each summary sheet indicates the title, principal investigator, institution of the investigation, and information related to the objectives of the research activities proposed for FY 93. The objective of the VDAP Program is to advance our understanding of the nature and evolution of Venus. VDAP supports scientific investigation using data obtained from the Magellan, Pioneer Venus, and other Venus missions, as well as earth-based observations that contribute to understanding the physical and evolutionary properties of Venus. The program intends to enhance the scientific return from these missions by broadening the participation in the analysis of Venus data. Categories of research funded by VDAP are atmosphere, ionosphere, geology, geophysics, and mapping. The directory is intended to provide the science community with an overview of the research projects supported by this program. Research activities identified in this directory were selected for funding in FY 93 on the basis of scientific peer review conducted by the VDAP Review Panel.
DOE Office of Scientific and Technical Information (OSTI.GOV)
PAUL,P.; FOX,K.J.
2000-07-01
In FY 1999, the BNL LDRD Program funded 33 projects, 25 of which were new starts, at a total cost of $4,525,584. A table is presented which lists all of the FY 1999 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which are given. A total of 29 informal publications (abstracts, presentations, reports and workshop papers) were reported and an additional 23 formal (full length) papers were either published, are in press or being prepared for publication.more » The investigators on five projects have filed for patents. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. The complete summary of follow-on activities is as follows: Information Publications--29, Formal Papers--23, Grants/Proposals/Follow-on Funding--7. In conclusion, a significant measure of success is already attributable to the FY 1999 LDRD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less
Summary data on all NASA procurement actions
NASA Technical Reports Server (NTRS)
1992-01-01
This report presents summary data on all NASA procurement actions and detailed information on contracts, grants, agreements, and other procurements over $25,000 awarded by NASA during Fiscal Year 1992 (FY-92). The dollar value on procurements over $25,000 amounted to 97 percent of the total dollar value of procurement actions completed during FY-92. However, these larger procurements accounted for only 28 percent of the total actions. Procurement action, as used in this report, means contractual actions to obtain supplies, services, or construction which increase or decrease funds. A procurement action thus may be a new procurement or modifications such as supplemental agreements, change orders, or terminations to an existing contract that change the total amount of funds obligated. An obligation is a contractual commitment to pay for supplies or services that are specified in the contract.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This volume contains summaries of FY 1979 government-sponsored environment and safety research related to energy arranged by log number, which groups the projects by reporting agency. The log number is a unique number assigned to each project from a block of numbers set aside for each contributing agency. Information elements included in the summary listings are project title, principal investigators, research organization, project number, contract number, supporting organization, funding level, related energy sources with numbers indicating percentages of effort devoted to each, and R and D categories. A brief description of each project is given, and this is followed bymore » subject index terms that were assigned for computer searching and for generating the printed subject index in the back of this volume.« less
USDA-ARS?s Scientific Manuscript database
Fillet yield (FY, %) is an economically important trait in rainbow trout aquaculture that reflects production efficiency. Despite that, FY has not received much attention in breeding programs because it is costly to measure and difficult to select on, limiting the genetic progress in traditional sel...
FY 2009 National Renewable Energy Laboratory (NREL) Annual Report: A Year of Energy Transformation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2010-01-01
This FY2009 Annual Report surveys the National Renewable Energy Laboratory's (NREL) accomplishments in renewable energy and energy efficiency research and development, commercialization and deployment of technologies, and strategic energy analysis. It offers NREL's vision and progress in building a clean, sustainable research campus and reports on community involvement.
Fort Collins Science Center: science accomplishments for fiscal years 2012 and 2013
Wilson, Juliette T.; Hamilton, David B.
2014-01-01
The Fort Collins Science Center (FORT) is a multi-disciplinary research and development center of the U.S. Geological Survey (USGS) located in Fort Collins, Colorado. Organizationally, FORT is within the USGS Southwest Region, although our work extends across the Nation and into several other countries. FORT research focuses on needs of the land- and water-management bureaus within the U.S. Department of the Interior (DOI), other Federal agencies, and those of State and non-government organizations. As a Science Center, we emphasize a multi-disciplinary science approach to provide information for resource-management decisionmaking. FORT’s vision is to maintain and continuously improve the integrated, collaborative, world-class research needed to inform effective, science-based land and resource management. Our science and technological development activities and unique capabilities support all USGS scientific Mission Areas and contribute to successful, collaborative science efforts across the USGS and DOI. We organized our report into an Executive Summary, a cross-reference table, and an appendix. The executive summary provides brief highlights of some key FORT accomplishments for each Mission Area. The table cross-references all major FY2012 and FY2013 science accomplishments with the various Mission Areas that each supports. The one-page accomplishment descriptions in the appendix are organized by USGS Mission Area and describe the many and diverse ways in which our science is applied to resource issues. As in prior years, lists of all FY2012 and FY2013 publications and other product types also are appended.
OMEGA FY13 HED requests - LANL
DOE Office of Scientific and Technical Information (OSTI.GOV)
Workman, Jonathan B; Loomis, Eric N
2012-06-25
This is a summary of scientific work to be performed on the OMEGA laser system located at the Laboratory for Laser Energetics in Rochester New York. The work is funded through Science and ICF Campagins and falls under the category of laser-driven High-Energy Density Physics experiments. This summary is presented to the Rochester scheduling committee on an annual basis for scheduling and planning purposes.
DOE Office of Scientific and Technical Information (OSTI.GOV)
FOX,K.J.
Brookhaven National (BNL) Laboratory is a multidisciplinary laboratory that carries out basic and applied research in the physical, biomedical, and environmental sciences, and in selected energy technologies. It is managed by Brookhaven Science Associates, LLC, under contract with the U. S. Department of Energy. BNL's total annual budget has averaged about $450 million. There are about 3,000 employees, and another 4,500 guest scientists and students who come each year to use the Laboratory's facilities and work with the staff. The BNL Laboratory Directed Research and Development (LDRD) Program reports its status to the U.S. Department of Energy (DOE) annually inmore » March, as required by DOE Order 4 1 3.2A, ''Laboratory Directed Research and Development,'' January 8, 2001, and the LDRD Annual Report guidance, updated February 12, 1999. The LDRD Program obtains its funds through the Laboratory overhead pool and operates under the authority of DOE Order 413.2A. The goals and objectives of BNL's LDRD Program can be inferred from the Program's stated purposes. These are to (1) encourage and support the development of new ideas and technology, (2) promote the early exploration and exploitation of creative and innovative concepts, and (3) develop new ''fundable'' R&D projects and programs. The emphasis is clearly articulated by BNL to be on supporting exploratory research ''which could lead to new programs, projects, and directions'' for the Laboratory. As one of the premier scientific laboratories of the DOE, BNL must continuously foster groundbreaking scientific research. At Brookhaven National Laboratory one such method is through its LDRD Program. This discretionary research and development tool is critical in maintaining the scientific excellence and long-term vitality of the Laboratory. Additionally, it is a means to stimulate the scientific community and foster new science and technology ideas, which becomes a major factor in achieving and maintaining staff excellence and a means to address national needs within the overall mission of the DOE and BNL. The LDRD Annual Report contains summaries of all research activities funded during Fiscal Year 2002. The Project Summaries with their accomplishments described in this report reflect the above. Aside from leading to new fundable or promising programs and producing especially noteworthy research, the LDRD activities have resulted in numerous publications in various professional and scientific journals and presentations at meetings and forums. All Fy 2002 projects are listed and tabulated in the Project Funding Table. Also included in this Annual Report in Appendix A is a summary of the proposed projects for FY 2003. The BNL LDRD budget authority by DOE in FY 2002 was $7 million. The actual allocation totaled $6.7 million. The following sections in this report contain the management processes, peer review, and the portfolio's relatedness to BNL's mission, initiatives and strategic plans. Also included is a metric of success indicators.« less
FY 2003 Acquisition and Technology Division Annual Report
2004-08-01
readiness. The Army will be better able to preserve readiness, save money, and avoid bad decisions by knowing which alternative cleaning products meet its...USAEC and ATC are leading an initiative to comprehensively test several cleaning products and gather data the Army and other DoD services can use to
College Preparation Intervention Program. FY 2003 Report
ERIC Educational Resources Information Center
Maryland Higher Education Commission, 2004
2004-01-01
The College Preparation Intervention Program (CPIP) was re-established by the 1999 Maryland General Assembly to improve the academic preparation of economically and environmentally disadvantaged students for college. The State CPIP appropriation and additional grant funding were used as part of the match required for the Maryland State Department …
National Space Biomedical Research Institute
NASA Technical Reports Server (NTRS)
2003-01-01
This report outlines the activities of the National Space Biomedical Research Institute (NSBRI) during FY 2003, the sixth year of the NSBRI's programs. It is prepared in accordance with Cooperative Agreement NCC 9-58 between NASA's Lyndon B. Johnson Space Center (JSC) and the Institute's lead institution, Baylor College of Medicine.
Applied Meteorology Unit (AMU) Quarterly Report First Quarter FY-04
NASA Technical Reports Server (NTRS)
Bauman, William; Wheeler, Mark; Labert, Winifred; Jonathan Case; Short, David
2004-01-01
This report summarizes the Applied Meteorology Unit (AMU) activities for the First Quarter of Fiscal Year 2004 (October - December 2003). Tasks reviewed are: (1) Objective Lightning Probability Forecast, (2) Mesonet Temperature and Wind Climatology, (3) Severe Weather Forecast Decision Aid and (4) Anvil Transparency Relationship to Radar Reflectivity
Delivering Innovation: The Joint Concept Development and Experimentation Campaign Plan FY2004-2011
2004-01-26
Janushkowsky (STRATCOM), Maj Gen Stenner (SOUTHCOM), LTC Butts (TRANSCOM) Campaign Plan; J9 UpdateFace to Face Conference12 Feb 2003 COL (P) Verbeck (EUCOM... Stenner (SOUTHCOM), Ms. Young (TRANSCOM), MG Higgins (USFK), Dr. Hanley (OSD-OFT), RADM Gallagher (ACT) Combatant Commander Attendees IWS IWS VTC
2004-05-01
Agents (NTAs) Compare the direct effects of PAF on smooth muscle, hematic constituents, and lung to determine role in toxicity. Continue to...baselined. Long Range Biometric Target ID System Explore technologies for a long range biometric target identification system. 3.5.1.6
NASA/MSFC FY-80 Atmospheric Processes Research Review
NASA Technical Reports Server (NTRS)
Turner, R. E. (Compiler)
1980-01-01
Three general areas of research were discussed: Global Weather, Upper Atmosphere, and Severe Storms and Local Weather. Research project summaries, in narrative outline form, stating objectives, significant accomplishments, and recommendations for future research are presented.
OSWER FY 2014 End of Year Accomplishments Report Executive Summary
Summarizes the many on-the-ground activities that are performed every day in communities across the country under the two broad goals of OSWER’s work, Preserving Land and Resources and Restoring Land.
Walter Reed Army Medical Center, Washington, D. C. - Annual Progress Report FY-89. Volume 1
1990-01-02
10.9 1 . 10- 5.3 4.8 0o POSITIVE NOT SURE NEGATIVE NOT APPLICABLE I ~FY88 FY89 I This survey of the effectiveness of services offered by the Department...Extracts (3/86) 1 3335 Squire, Edward LTC MC. Do Aeroallergens Exacerbate Atopic 25 Dermatitis (9/87) 3336 Yang, Edward MAJ MC. The Effect of Human...Symptoms Before and After Parathyroid Surgery (4/86) 1381-86 Smallridge, Robert COL MC. Effect of Obesity on 129 Pharmacokinetics of Atropine in Young Men (8
2003 South Dakota motor vehicle traffic crash summary
DOT National Transportation Integrated Search
2004-05-01
The South Dakota Motor Vehicle Traffic Crash Summary was developed to provide an : overview of the South Dakota traffic crash picture, as well as make frequently requested : information available. Information from 2003 comprises the major portion of ...
1998-06-01
FOR THE MAJORITY OF THE POPULATION RECEIVNG CARE IN FY 95 AND FY 96 37 TABLE 4: COMPARISION OF GOVERNMENT COSTS PER EPISODE IN CIVILIAN AND MILITARY ...FACKLTITES 40 TABLE 5: COMPARISION OF TOTAL GOVERNMENT COSTS IN CIVILIAN AND MILITARY FACILITIES 41 TABLE 6: SUMMARY OF PROJECTED TOTAL GOVERNMENT...is managed by an executive military health care staff, known as the Lead Agent, in each of 14 geographic regions in the U.S., Europe and Pacific
2008-09-01
2006, stating “it is possible that substantially more funding may be needed than has been proposed by the administration ;” one of the summary points...statements includes “the National Conference of State Legislatures (NCSL) urges Congress and the administration to maintain and improve funding for...following table project a continued funding decrease, albeit there was an increase in FY2008 funding. The original FY2008 Administration request for all
Furniture Rack Corrosion Coupon Surveillance - 2012 Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mickalonis, J. I.; Murphy, T. R.; Berry, C. J.
Under the L Basin corrosion surveillance program furniture rack coupons immersed for 14 years (FY2009 coupons) and 16 years (FY2011 coupons) were analyzed and the results trended with coupons exposed for shorter times. In addition, a section harvested from an actual furniture rack that was immersed for 14 years was analyzed for pitting in the weld and heat-affected-zone (HAZ) regions. The L Basin operations maintained very good water quality over the entire immersion period for these samples. These results for FY2009 and FY2011 coupons showed that the average pit depths for the 6061 and 6063 base metal are 1 andmore » 2 mils, respectively, while those for the weld and HAZ are 3 and 4 mils, respectively. The results for the weld and HAZ regions are similar to coupons removed during the period of FY2003 to FY2007. These similarities indicate that the pit development occurred quickly followed by slow kinetics of increase in pit depth. For the actual furniture rack sample average pits of 5 and 2 mils were measured for the HAZ and weld, respectively. These results demonstrate that pitting corrosion of the aluminum furniture racks used to support the spent fuel occurs in waters of good quality. The corrosion kinetics or pit depth growth rate is much less that 1 mil/year, and would not impact long-term use of this material system for fuel storage racks in L Basin if good water quality is maintained.« less
Lead Slowing-Down Spectrometry for Spent Fuel Assay: FY11 Status Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Warren, Glen A.; Casella, Andrew M.; Haight, R. C.
2011-08-01
Executive Summary Developing a method for the accurate, direct, and independent assay of the fissile isotopes in bulk materials (such as used fuel) from next-generation domestic nuclear fuel cycles is a goal of the Office of Nuclear Energy, Fuel Cycle R&D, Material Protection and Control Technology (MPACT) Campaign. To meet this goal, MPACT supports a multi-institutional collaboration to study the feasibility of Lead Slowing Down Spectroscopy (LSDS). This technique is an active nondestructive assay method that has the potential to provide independent, direct measurement of Pu and U isotopic masses in used fuel with an uncertainty considerably lower than themore » approximately 10% typical of today’s confirmatory assay methods. This document is a progress report for FY2011 collaboration activities. Progress made by the collaboration in FY2011 continues to indicate the promise of LSDS techniques applied to used fuel. PNNL developed an empirical model based on calibration of the LSDS to responses generated from well-characterized used fuel. The empirical model demonstrated the potential for the direct and independent assay of the sum of the masses of 239Pu and 241Pu to within approximately 3% over a wide used fuel parameter space. Similar results were obtained using a perturbation approach developed by LANL. Benchmark measurements have been successfully conducted at LANL and at RPI using their respective LSDS instruments. The ISU and UNLV collaborative effort is focused on the fabrication and testing of prototype fission chambers lined with ultra-depleted 238U and 232Th, and uranium deposition on a stainless steel disc using spiked U3O8 from room temperature ionic liquid was successful, with improving thickness obtained. In FY2012, the collaboration plans a broad array of activities. PNNL will focus on optimizing its empirical model and minimizing its reliance on calibration data, as well continuing efforts on developing an analytical model. Additional measurements are planned at LANL and RPI. LANL measurements will include a Pu sample, which is expected to provide more counts at longer slowing-down times to help identify discrepancies between experimental data and MCNPX simulations. RPI measurements will include the assay of an entire fresh fuel assembly for the study of self-shielding effects as well as the ability to detect diversion by detecting a missing fuel pin in the fuel assembly. The development of threshold neutron sensors will continue, and UNLV will calibrate existing ultra-depleted uranium deposits at ISU.« less
Accelerated testing for studying pavement design and performance (FY 2004) : research summary.
DOT National Transportation Integrated Search
2009-03-01
The thirteenth full-scale Accelerated Pavement Test (APT) experiment at the Civil Infrastructure Laboratory (CISL) of Kansas State University aimed to determine the response and the failure mode of thin concrete overlays.
76 FR 15039 - Commercial Space Transportation Grants Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-18
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Commercial Space Transportation... proposals for the Commercial Space Transportation Grant Program. SUMMARY: This notice solicits Fiscal Year (FY) 2011 grant proposals to continue the development of a Commercial Space Transportation...
Summaries of FY16 LANL experimental campaigns at the OMEGA and EP Laser Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Loomis, Eric Nicholas; Merritt, Elizabeth Catherine; Montgomery, David
In FY16, Los Alamos National Laboratory carried out 22 shot days on the OMEGA and OMEGA- EP laser facilities in the areas of High Energy Density (HED) Science and Inertial Confinement Fusion (ICF). In HED our focus areas were on radiation flow, hydrodynamic turbulent mix and burn, warm dense matter equations of state, and coupled Kelvin-Helmholtz (KH)/Richtmyer- Meshkov (RM) instability growth. For ICF our campaigns focused on the Priority Research Directions (PRD) of implosion phase mix and stagnation and burn, specifically as they pertain to Laser Direct Drive (LDD). We also had several focused shot days on transport properties inmore » the kinetic regime. We continue to develop advanced diagnostics such as Neutron Imaging, Gamma Reaction History, and Gas Cherenkov Detectors. Below are a summary of our campaigns, their motivation, and main results from this year.« less
2003 Missouri state highway system : traffic accident statistics
DOT National Transportation Integrated Search
2004-08-12
The following summary of traffic accidents represents only those accidents that have occurred on the State Highway : System of Missouri in 2003. The information contained in this publication is a summary of the accident reports : provided to the Miss...
A Summary of the Naval Postgraduate School Research Program.
1983-05-01
environment . Of particular note here are the activities of the Environmental Physics Group, our work in electro-optics, and work anticipated in the...of natural light and the optical beam spread function of the ocean. The sponsor is DARPA. ENVIRONMENTAL ACOUSTICS G. H. Jung, R. H. Bourke, C. R... environmental phenomena determine the nature of ambient noise signals received at hydrophone arrays. Summary: During FY82, additional data bases were
1995-02-01
Descriptive Summary 2 FIP Resources and Indefinite Delivery - Quantity Contracts 3 Central Design Activity Summary 4 Accesion For NTIS CRA&IDTIC TAB...interface with financial systems should be integrated into the standard architecture of the Military Departments iii to ensure maximum cost...provided to support and maintain the DFAS enterprise local area network initiative to establish a standardized architecture for office automation and
A Summary of the Naval Postgraduate School Research Programs and Recent Publications.
1991-09-01
publication by the ASNE accepted on an international basis as an effective Naval Engineering Journal after final editing, means of reducing ship roll...Teleoperator," SUMMARY: A non-anthropomorphic, force International Journal of Robotics and Autlonomouts reflecting telemanipulator was procured in FY91...and From 22-24 May 1991. Centrifugal Instabilities," International Journal of Heat and Fluid Flow, forthcoming. THESES DIRECTED: Hughes, R.E., LT, USN
1983-01-01
SUMMARY: (ollars in Thouesands) The changes between the funding profile shown in the FY 1983 Descriptive Summary and that shown in this De ,,criptive...System (ONAV Report Symbol 3960-12 b. I April 1982 MOSC Test Report Joint Tactical Information Distribution System Phase II (Distributed Time De -ision...Vehicle Tricked (LVTP7) 453 - - - 5,728 Product Improvement C0021 Landing Vehicle Tracked-Al - - - 2,848*, TBD TED C0061 Battlefield Surveillance De -vices
FY2011 Annual Progress Report for Propulsion Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Patrick B.; Schutte, Carol L.; Gibbs, Jerry L.
Annual Progress Report for Propulsion Materials focusing on enabling and innovative materials technologies that are critical in improving the efficiency of advanced engines by providing enabling materials support for combustion, hybrid, and power electronics development.
U.S. Department of Energy Photovoltaic Energy Program Contract Summary: Fiscal Year 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Surek, T.
2001-02-21
This report summarizes the in-house and subcontracted research and development (R and D) activities under the National Center for Photovoltaics (NCPV) and U.S. Department of Energy (DOE) National Photovoltaics Program from October 1, 1999, through September 30, 2000 (FY 2000). The mission of the DOE National Photovoltaics Program is to make PV a significant part of the domestic economy-as an industry and an energy resource. The two primary goals of the national program are to (1) maintain the U.S. industry's world leadership in research and technology development and (2) help the U.S. industry remain a major, profitable force in themore » world market. The NCPV is part of the National PV Program and provides leadership and support to the national program toward achieving its mission and goals. This Contract Summary for fiscal year (FY) 2000 documents some 179 research projects supported by the PV Program, performed by 107 organizations in 32 states, including 69 projects performed by universities and 60 projects performed by our industry partners. Of the total FY 2000 PV Program budget of $65.9 million, the industry and university research efforts received $36.9 million, or nearly 56%. And, of this amount, more than 93% was for contractors selected on a competitive basis. Much of the funding to industry was matched by industry cost-sharing. Each individual effort described in this summary represents another step toward improving PV manufacturing, performance, cost, and applications, and another step toward accomplishing the DOE PV Program's overall mission.« less
According to FY2003 statistics compiled by the Office of Ground Water and Drinking Water, the U.S. regulates about 160,000 small drinking water systems that impact close to 70 million people. Small systems (serving transient and non-transient populations of 10,000 people or less...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-30
... report to Congress is provided in accordance with section 608(a) of the Millennium Challenge Act of 2003... report was initially published in September 2011. In December 2011, Congress enacted changes in MCC's FY... MILLENNIUM CHALLENGE CORPORATION [MCC 12-04] Report on Countries That Are Candidates for...
Southern Rural Development Center Annual Progress Report, FY 1985. SRDC Series No. 80.
ERIC Educational Resources Information Center
Southern Rural Development Center, Mississippi State, MS.
In fiscal year (FY) 1985 the Southern Rural Development Center (SRDC) was engaged in 24 major activities that responded to the rural problems of the region and supported the community development efforts of 29 land-grant universities in 13 southern states, Puerto Rico, and the Virgin Islands. The work of the SRDC Business Management Network…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
...-guidance-11052010.pdf and http://www.whitehouse.gov/sites/default/files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The National Science Foundation has posted its inventory and a summary of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-13
...-guidance-11052010.pdf and http://www.whitehouse.gov/sites/default/files/omb/procurement/memo/service-contract-inventory-guidance.pdf . The National Science Foundation has posted its inventory and a summary of...
77 FR 14462 - Space Transportation Infrastructure Matching Grants Program
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Space Transportation Infrastructure... grant proposals for the Space Transportation Infrastructure Matching Grants Program. SUMMARY: This notice solicits Fiscal Year (FY) 2012 grant proposals to continue the development of a Commercial Space...
1978-01-01
1 O MW i fr 9 C-4 M i &.<? o 2 H ^ 0’O rn ublic U nlin f £• S s o Sü- W’ o- g 31 1 > o m —I ^_) Ŕ mm OmH Jo...34" > rn^ ^ <> mm:o ooO< m 5c — ^rn 71 o HH 73 m m > O > * *< < > m 3 5 2. m g. z 5 " 1 3 H 3 co J5 ß0 3 21 fO>~ftOSf97S o ö CD c...mftmmmmmmmmmm ^•5 UNCLASSIFIED SECURITY CLASSIFICATION OF THIS PAGE (Whmn Data Entered) REPORT DOCUMENTATION PAGE 1 . REPORT NUMBER None
Physics division. Progress report, January 1, 1995--December 31, 1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stewart, M.; Bacon, D.S.; Aine, C.J.
1997-10-01
This issue of the Physics Division Progress Report describes progress and achievements in Physics Division research during the period January 1, 1995-December 31, 1996. The report covers the five main areas of experimental research and development in which Physics Division serves the needs of Los Alamos National Laboratory and the nation in applied and basic sciences: (1) biophysics, (2) hydrodynamic physics, (3) neutron science and technology, (4) plasma physics, and (5) subatomic physics. Included in this report are a message from the Division Director, the Physics Division mission statement, an organizational chart, descriptions of the research areas of the fivemore » groups in the Division, selected research highlights, project descriptions, the Division staffing and funding levels for FY95-FY97, and a list of publications and presentations.« less
Hardy, Ellen E.; Dragos, Stefanie L.
1996-01-01
This report contains summaries of the progress of water-resources studies in Utah done by the U.S. Geological Survey, Water Resources Division, Utah District, from October 1,1994, to September 30, 1995. The waterresources program in Utah during this period consisted of 23 projects; a discussion of each project is presented in the main body of this report.The following sections outline the origin of the U.S. Geological Survey, the basic mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year (FY) 1995 (October 1, 1994, to September 30,1995), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1994 to September 1995.
Hardy, Ellen E.; Dragos, Stefanie L.
1998-01-01
This report contains summaries of the progress of water-resources activities of the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1996, to September 30,1997. The waterresources program in Utah during this period consisted of 25 projects, and a discussion of each project is presented.The following sections outline the origin of the USGS, the mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year 1997 (FY97) (October 1,1996, to September 30, 1997), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1996 to September 1997.
Hardy, Ellen E.; Dragos, Stefanie L.
1997-01-01
This report contains summaries of the progress of water-resources activities of the U.S. Geological Survey (USGS), Water Resources Division, Utah District, from October 1, 1995, to September 30, 1996. The waterresources program in Utah during this period consisted of 22 projects; a discussion of each project is presented in the main body of this report.The following sections outline the origin of the USGS, the mission of the Water Resources Division, the organizational structure of the Utah District, office addresses of the Utah District, the distribution of program funding as source of funds and type of activity funded in Federal Fiscal Year 1996 (FY96) (October 1, 1995, to September 30, 1996), and the agencies with which the District cooperates. The last part of the introduction is a list of reports produced by the District from October 1995 to September 1996.
FY96-98 Summary Report Mercury: Next Generation Laser for High Energy Density Physics SI-014
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bayramian, A.; Beach, R.; Bibeau, C.
The scope of the Mercury Laser project encompasses the research, development, and engineering required to build a new generation of diode-pumped solid-state lasers for Inertial Confinement Fusion (ICF). The Mercury Laser will be the first integrated demonstration of laser diodes, crystals, and gas cooling within a scalable laser architecture. This report is intended to summarize the progress accomplished during the first three years of the project. Due to the technological challenges associated with production of 900 nm diode-bars, heatsinks, and high optical-quality Yb:S-FAP crystals, the initial focus of the project was primarily centered on the R&D in these three areas.more » During the third year of the project, the R&D continued in parallel with the development of computer codes, partial activation of the laser, component testing, and code validation where appropriate.« less
NASA Technical Reports Server (NTRS)
Skow, Miles G.
2014-01-01
This three year project (FY12-14) will design and demonstrate the ability of new Magnetic Stress Gages for the measurement of stresses on the inner diameter of a Composite Overwrapped Pressure Vessel overwrap.
Idaho National Laboratory Mission Accomplishments, Fiscal Year 2015
DOE Office of Scientific and Technical Information (OSTI.GOV)
Allen, Todd Randall; Wright, Virginia Latta
A summary of mission accomplishments for the research organizations at the Idaho National Laboratory for FY 2015. Areas include Nuclear Energy, National and Homeland Security, Science and Technology Addressing Broad DOE Missions; Collaborations; and Stewardship and Operation of Research Facilities.
78 FR 37648 - Space Transportation Infrastructure Matching (STIM) Grants Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Space Transportation Infrastructure...-availability of Space Transportation Infrastructure Matching Grants in FY 2013. SUMMARY: The Office of Commercial Space Transportation (AST) will not solicit or award grants under the STIM program this fiscal...
Accelerated testing for studying pavement design and performance (FY 2002) : research summary.
DOT National Transportation Integrated Search
2004-01-01
This report covers the Fiscal Year 2002 project conducted at the Accelerated Testing : Laboratory at Kansas State University. The project was selected and funded by the : Midwest States Accelerated Testing Pooled Fund Program, which includes Iowa, Ka...
Nuclear rocket propulsion. NASA plans and progress, FY 1991
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space explorer initiative (SEI) human and robotic missions to the moon and Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.
Nuclear rocket propulsion: NASA plans and progress - FY 1991
NASA Technical Reports Server (NTRS)
Clark, John S.; Miller, Thomas J.
1991-01-01
NASA has initiated planning for a technology development project for nuclear rocket propulsion systems for space exploration initiative (SEI) human and robotic missions to the Moon and to Mars. An interagency project is underway that includes the Department of Energy National Laboratories for nuclear technology development. The activities of the project planning team in FY 1990 and 1991 are summarized. The progress to date is discussed, and the project plan is reviewed. Critical technology issues were identified and include: (1) nuclear fuel temperature, life, and reliability; (2) nuclear system ground test; (3) safety; (4) autonomous system operation and health monitoring; and (5) minimum mass and high specific impulse.
Laboratory Directed Research and Development FY-15 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pillai, Rekha Sukamar
The Laboratory Directed Research and Development (LDRD) Program at Idaho National Laboratory (INL) reports its status to the U.S. Department of Energy (DOE) by March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the laboratory director broad flexibility for program implementation. LDRD funds are obtained through a charge to all INL programs. This report includes summaries of all INL LDRD research activities supported during Fiscal Year (FY) 2015.
1992-01-01
counications between technology producer (Navy RDT&X community) and technology customer (Navy/MarLne Corps operating forces). Program technological...Additional programs as rwured by Fleet customer . 3. (U) 1t 1993 Planes Identify issues and provide link to RDT&3 community. Projects will vary according to...fleet customer requLrements. 4. (U) Program to Cmpletions This is a continuing program. D. (U) WORK pIRFORIpD l: iN-DOSE: NsWC Dahlgren, VA; AC
Laboratory Directed Research and Development LDRD-FY-2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dena Tomchak
2012-03-01
This report provides a summary of the research conducted at the Idaho National Laboratory (INL) during Fiscal Year (FY) 2011. This report demonstrates the types of cutting edge research the INL is performing to help ensure the nation's energy security. The research conducted under this program is aligned with our strategic direction, benefits the Department of Energy (DOE) and is in compliance with DOE order 413.2B. This report summarizes the diverse research and development portfolio with emphasis on the DOE Office of Nuclear Energy (DOE-NE) mission, encompassing both advanced nuclear science and technology and underlying technologies.
NASA Technical Reports Server (NTRS)
Calaway, Michael J.
2013-01-01
In preparation for OSIRIS-REx and other future sample return missions concerned with analyzing organics, we conducted an Organic Contamination Baseline Study for JSC Curation Labsoratories in FY12. For FY12 testing, organic baseline study focused only on molecular organic contamination in JSC curation gloveboxes: presumably future collections (i.e. Lunar, Mars, asteroid missions) would use isolation containment systems over only cleanrooms for primary sample storage. This decision was made due to limit historical data on curation gloveboxes, limited IR&D funds and Genesis routinely monitors organics in their ISO class 4 cleanrooms.
United States Army Biomedical Research and Development Laboratory Annual Progress Report FY90
1991-01-01
pesticide . Parallel and follow-on studies will include hydrolysis products of nerve agents , vesicants, and agents of...Division FO Fog oil FORSCOM U.S. Army Forces Command FY Fiscal year 249 GA The nerve agent tabun GB The nerve agent soman GD The nerve agent sarin GLP... Nerve Agents , Industrial Hygiene Sampling, Microbiology, Combustion Products, Liquid Gun Propellant, Organic Chemistry, Inorganic
2012 Wind Program Peer Review Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zayas, Jose; Higgins, Mark
2012-06-01
This report summarizes the proceedings of the 2012 Wind Program Peer Review, the goals of which were to review and evaluate the strategy and goals of the Wind Program; review and evaluate the progress and accomplishments of the program's projects funded in fiscal year (FY) 2010 and FY 2011; and foster interactions among the national laboratories, industry, and academic institutions conducting research and development on behalf of the program.
2005-05-13
After the events of September 11, 2001, federal funding for state public health preparedness programs increased from $67 million in fiscal year (FY) 2001 to approximately $1 billion in FY 2002. These funds were intended to support preparedness for and response to terrorism, infectious disease outbreaks, and other public health threats and emergencies. The Council of State and Territorial Epidemiologists (CSTE) assessed the impact of funding on epidemiologic capacity, including terrorism preparedness and response, in state health departments in November 2001 and again in May 2004, after distribution of an additional $1 billion in FY 2003. This report describes the results of those assessments, which indicated that increased funding for terrorism preparedness and emergency response has rapidly increased the number of epidemiologists and increased capacity for preparedness at the state level. However, despite the increase in epidemiologists, state public health officials estimate that 192 additional epidemiologists, an increase of 45.3%, are needed nationwide to fully staff terrorism preparedness programs.
Notification: EPA Progress in Reducing Taxpayer Environmental Liabilities
Project #OPE-FY15-0052, May 28, 2015. The EPA OIG plans to begin preliminary research on the EPA’s progress in reducing taxpayer liabilities through the use of financial assurance instruments for RCRA facilities and Superfund sites.
Protect and Restore Mill Creek Watershed; Annual Report 2003-2004.
DOE Office of Scientific and Technical Information (OSTI.GOV)
McRoberts, Heidi
2004-06-01
The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. The Nez Perce Tribe and the Nez Perce National Forest have formed a partnership in completing watershed restoration activities, and through this partnership, more work is accomplished by sharing funding and resources in our effort. The Nez Perce Tribe began watershed restoration projects within the Mill Creek watershed of the South Fork Clearwater River in 2000. Progress has been made in restoring the watershed through excluding cattle from critical riparian areas through fencing. Starting in FY 2002, continuing into 2004,more » trees were planted in riparian areas in the meadow of the upper watershed. In addition, a complete inventory of culverts at road-stream crossings was completed. Culverts have been prioritized for replacement to accommodate fish passage throughout the watershed, and designs completed on two of the high priority culverts. Maintenance to the previously built fence was also completed.« less
Public Libraries Survey: Fiscal Year 2009
ERIC Educational Resources Information Center
Miller, Kim A.; Swan, Deanne W.; Craig, Terri; Dorinski, Suzanne; Freeman, Michael; Isaac, Natasha; O'Shea, Patricia; Schilling, Peter; Scotto, Jennifer
2011-01-01
The Public Libraries Survey (PLS) is a voluntary survey conducted annually by the Institute of Museum and Library Services (IMLS). IMLS collects these data under the mandate in the Museum and Library Services Act of 2003 as stated in SEC. 210. The U.S. Census Bureau is the data collection agent for IMLS. The fiscal year (FY) 2009 survey is the…
DOT National Transportation Integrated Search
2004-12-07
The project originally was granted funding from the earmark in an application dated June 1, 2000. A revised application received approval on May 19, 2003 to reflect a different proposed implementation of the project, while still achieving the project...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Larry G. Hoffman; Kenneth Alvar; Thomas Buhl
1999-06-01
This progress report presents the results of 10 projects funded ($504K) in FY98 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division. Nine projects are new for this year; two projects were completed in their third and final TDEA-funded year. As a result of their TDEA-funded projects, investigators have published 19 papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplemental funds and in-kind contributions, such as staff time, instrument use, and work space were also provided to the TDEA-funded projects by organizations external to ESHmore » Division. Products generated from the projects funded in FY98 included a new extremity dosimeter that replaced the previously used finger-ring dosimeters, a light and easy-to-use detector to measure energy deposited by neutron interactions, and a device that will allow workers to determine the severity of a hazard.« less
Solar thermal technology report, FY 1981. Volume 1: Executive summary
NASA Technical Reports Server (NTRS)
1982-01-01
The activities of the Department of Energy's Solar Thermal Technology Program are discussed. Highlights of technical activities and brief descriptions of each technology are given. Solar thermal conversion concepts are discussed in detail, particularily concentrating collectors and salt-gradient solar ponds.
Chemiresistor microsensors for in-situ monitoring of volatile organic compounds : final LDRD report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomas, Michael Loren; Hughes, Robert Clark; Kooser, Ara S.
2003-09-01
This report provides a summary of the three-year LDRD (Laboratory Directed Research and Development) project aimed at developing microchemical sensors for continuous, in-situ monitoring of volatile organic compounds. A chemiresistor sensor array was integrated with a unique, waterproof housing that allows the sensors to be operated in a variety of media including air, soil, and water. Numerous tests were performed to evaluate and improve the sensitivity, stability, and discriminatory capabilities of the chemiresistors. Field tests were conducted in California, Nevada, and New Mexico to further test and develop the sensors in actual environments within integrated monitoring systems. The field testsmore » addressed issues regarding data acquisition, telemetry, power requirements, data processing, and other engineering requirements. Significant advances were made in the areas of polymer optimization, packaging, data analysis, discrimination, design, and information dissemination (e.g., real-time web posting of data; see www.sandia.gov/sensor). This project has stimulated significant interest among commercial and academic institutions. A CRADA (Cooperative Research and Development Agreement) was initiated in FY03 to investigate manufacturing methods, and a Work for Others contract was established between Sandia and Edwards Air Force Base for FY02-FY04. Funding was also obtained from DOE as part of their Advanced Monitoring Systems Initiative program from FY01 to FY03, and a DOE EMSP contract was awarded jointly to Sandia and INEEL for FY04-FY06. Contracts were also established for collaborative research with Brigham Young University to further evaluate, understand, and improve the performance of the chemiresistor sensors.« less
Microgravity science and applications. Program tasks and bibliography for FY 1994
NASA Technical Reports Server (NTRS)
1995-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground-based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. ATD (Advanced Technology Development) program task descriptions are also included. The bibliography cites the related PI (Principal Investigator) publications and presentations for these program tasks in FY 1994. Three appendices include Table of Acronyms, Guest Investigator Index, and Principal Investigator Index.
Microgravity science & applications. Program tasks and bibliography for FY 1995
NASA Technical Reports Server (NTRS)
1996-01-01
This annual report includes research projects funded by the Office of Life and Microgravity Sciences and Applications, Microgravity Science and Applications Division, during FY 1994. It is a compilation of program tasks (objective, description, significance, progress, students funded under research, and bibliographic citations) for flight research and ground based research in five major scientific disciplines: benchmark science, biotechnology, combustion science, fluid physics, and materials science. Advanced technology development (ATD) program task descriptions are also included. The bibliography cites the related principle investigator (PI) publications and presentations for these program tasks in FY 1994. Three appendices include a Table of Acronyms, a Guest Investigator index and a Principle Investigator index.
Annual Progress Report Fiscal Year 1982.
1982-09-30
255 Work Jnit No. 82/43 (FY82,O) A\\dolescent Immunity to Varicella and Cytomegalovirus .............. 256 Work Unit No. 82/45 (FY82,O) V!1-26 In...with technetium-99m bone agent(Infarct avid) radiopharmaceuticals. Presented at the New Mexico Society of Internal Medicine, Albuquerque NM, 11-12 Dec...No: 82/43 Status: Ongoing Title: Adolescent Immunity to Varicella and Cytomegalovirus Start Date: Est Comp Date: Principal Investigator: Facility: LTC
Annual Progress Report (FY-79) Clinical Investigation Service. Walter Reed Army Medical Center
1979-09-30
Determination of Gram 311 Negative Meningtis Septic Arthritis and Contamination of Intra- venous Fluids. (FY18 0) 1908 Evaluation of Sodium Stibogluconate... Venous L-Phenylalannie Mustard. Accepted for publication in Cancer Treatment Reports. Cuttner, J., et al. A Controlled Trial of Chemoimmunotherapy in...Boston, Mass, 11-12 Oct 1979. (Abstract) DEPATIT-NENT OF SURGERY Cornwell CG. Hypersensitivity Reaetlons to Intra- Venous L-Phenylalanine M.Vustard
Shao, Lin-Nan; Zhang, Shu-Ting; Zhou, Shi-Hang; Yu, Wei-Jian; Liu, Ming
2017-01-01
Background & Objective: Atypical chemokine receptor 1(ACKR1) represents an atypical chemokine receptor that can bind promiscuously to various chemokines. Chemokines play a crucial role to recruit leukocyte subsets migration through the endothelium and into liver against the virus during the progression of hepatitis C virus (HCV) infection. Most HCV positive patients can lead to liver fibrosis. Hyaluronic acid (HA), laminin (LN), collagen IV(C-IV) and amino-terminal pro-peptide of Type-III pro-collagen (PIII NP) are indices of the extent of liver fibrosis. The aim of this study was to investigate the association between ACKR1 polymorphism and liver fibrosis with these four serum liver markers in HCV positive patients. Methods: From April 2015 to December 2015, a total of 210 patients (109 males and 101 females) with chronic HCV infection at Dalian Infectious Hospital were recruited to participate in this study. ACKR1 genotyping was using TaqMan probes method. HA, LN, C-IV and PIII NP were detected by using diagnostic kits. Results: We compared serum levels of HA, LN, C-IV and PIII NP between FY*A/FY*A and FY*A/FY*B patients and the differences were not significant (P=0.905, P=0.298, P=0.880 and P=0.470, respectively). Conclusions: This study has attempted to elucidate the role of ACKR1 polymorphism in liver fibrosis progression of HCV infection, our results demonstrated that ACKR1 polymorphism is not directly associated with the fibrogenesis in HCV positive patients. PMID:29142552
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes significant FY93 programmatic information and accomplishments relevant to the individual activities within the Office of Technology Development Program for Research, Development, Demonstration, Testing, and Evaluation (RDDT&E). A brief discussion of the mission of the Office of Environmental Restoration and Waste Management (EM) and the Office of Technology Development is presented. An overview is presented of the major problem areas confronting DOE. These problem areas include: groundwater and soils cleanup; waste retrieval and processing; and pollution prevention. The organizational elements within EM are highlighted. An EM-50 Funding Summary for FY92 and FY93 is also provided. RDDT&E programs aremore » discussed and their key problem areas are summarized. Three salient program-formulating concepts are explained. They are: Integrated Demonstrations, Integrated Programs, and the technology window of opportunity. Detailed information for each of the programs within RDDT&E is presented and includes a fact sheet, a list of technical task plans and an accomplishments and objectives section.« less
Illinois Institute of Technology Report: IITB52 Antifoamer for Alternative Salt Processes
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, D.P.
2001-06-27
The attached report is a summary of the work performed by Dr. Darsh Wasan, Dr. Alex Nikolov, and their researchers at the Illinois Institute of Technology (IIT) during FY01. IIT developed the IITB52 antifoam for SRTC in FY00 to minimize the foam produced during precipitation, washing and concentration of cesium and potassium tetraphenyl borate precipitate. The IITB52 antifoam has been very successful during continuous processing (prototypical of plant operation). However, there were several key issues where SRTC needed the experience and knowledge of IIT to resolve. As a result a subcontract was set up with Dr. Wasan and Dr. Alexmore » Nikolov during FY01. This subcontract requested IIT to perform the basic research necessary to understand the foaming mechanism and explain the effectiveness of the IITB52 antifoam agent in the Small Tank Tetraphenylborate Process (STTP).« less
DOT National Transportation Integrated Search
2011-02-01
This report summarizes the work performed in Fiscal Year (FY) 2009 and 2010 under TxDOT : Implementation Project 5-5541-01 Regional Workshops on Sustainability Enhancement : Tool. TxDOT Research Project 0-5541, Developing Sustainable Tra...
78 FR 21919 - Public Availability of Fiscal Year 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... Inventory AGENCY: Commodity Futures Trading Commission. ACTION: Notice. SUMMARY: The Commodity Futures... Fiscal Year (FY) 2012 Service Contract Inventory. FOR FURTHER INFORMATION CONTACT: Questions regarding the Service Contract Inventory should be directed to Sonda R. Owens, Contracting Officer, in the...
78 FR 18966 - Publication of Fiscal Year 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-28
... Year 2012 Service Contract Inventory AGENCY: Court Services and Offender Supervision Agency for the District of Columbia. ACTION: Notice of Public Availability of FY 2012 Service Contract Inventory. SUMMARY... 2012 Service Contract Inventory. This inventory provides information on service contract actions over...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
2011-03-01
The U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office performed an annual review of the Area 3 and Area 5 Radioactive Waste Management Site (RWMS) Performance Assessments (PAs) and Composite Analyses (CAs) in fiscal year (FY) 2010. This annual summary report presents data and conclusions from the FY 2010 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at themore » Nevada National Security Site (NNSS) (formerly the Nevada Test Site) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs.« less
Laboratory Directed Research and Development FY2011 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Craig, W; Sketchley, J; Kotta, P
2012-03-22
A premier applied-science laboratory, Lawrence Livermore National Laboratory (LLNL) has earned the reputation as a leader in providing science and technology solutions to the most pressing national and global security problems. The LDRD Program, established by Congress at all DOE national laboratories in 1991, is LLNL's most important single resource for fostering excellent science and technology for today's needs and tomorrow's challenges. The LDRD internally directed research and development funding at LLNL enables high-risk, potentially high-payoff projects at the forefront of science and technology. The LDRD Program at Livermore serves to: (1) Support the Laboratory's missions, strategic plan, and foundationalmore » science; (2) Maintain the Laboratory's science and technology vitality; (3) Promote recruiting and retention; (4) Pursue collaborations; (5) Generate intellectual property; and (6) Strengthen the U.S. economy. Myriad LDRD projects over the years have made important contributions to every facet of the Laboratory's mission and strategic plan, including its commitment to nuclear, global, and energy and environmental security, as well as cutting-edge science and technology and engineering in high-energy-density matter, high-performance computing and simulation, materials and chemistry at the extremes, information systems, measurements and experimental science, and energy manipulation. A summary of each project was submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to DOE/NNSA and LLNL mission areas, the technical progress achieved in FY11, and a list of publications that resulted from the research. The projects are: (1) Nuclear Threat Reduction; (2) Biosecurity; (3) High-Performance Computing and Simulation; (4) Intelligence; (5) Cybersecurity; (6) Energy Security; (7) Carbon Capture; (8) Material Properties, Theory, and Design; (9) Radiochemistry; (10) High-Energy-Density Science; (11) Laser Inertial-Fusion Energy; (12) Advanced Laser Optical Systems and Applications; (12) Space Security; (13) Stockpile Stewardship Science; (14) National Security; (15) Alternative Energy; and (16) Climatic Change.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
L.G. Hoffman; K. Alvar; T. Buhl
2002-05-01
This progress report presents the results of 11 projects funded ($500K) in FY01 by the Technology Development, Evaluation, and Application (TDEA) Committee of the Environment, Safety, and Health Division (ESH). Five projects fit into the Health Physics discipline, 5 projects are environmental science and one is industrial hygiene/safety. As a result of their TDEA-funded projects, investigators have published sixteen papers in professional journals, proceedings, or Los Alamos reports and presented their work at professional meetings. Supplement funds and in-kind contributions, such as staff time, instrument use, and workspace, were also provided to TDEA-funded projects by organizations external to ESH Divisions.
NASA Technical Reports Server (NTRS)
Venkatapathy, Ethiraj; Ellerby, Don; Gage, Peter
2017-01-01
Heat-shield for Extreme Entry Environment Technology (HEEET) has been in development since 2014 with the goal of enabling missions to Venus, Saturn and other high-speed sample return missions. It is offered as a new technology and incentivized for mission use in the New Frontiers 4 AO by NASA. The current plans are to mature the technology to TRL 6 by FY18. The HEEET Team has been working closely with multiple NF-4 proposals to Venus, Saturn and has been supporting recent Ice-Giants mission studies. This presentation will provide progress made to date and the plans for development in FY18.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Albersheim, Peter; Darvill, Alan
2003-10-31
This progress report describes the research, service, and training activities conducted with the support of the DOE center grant. The research activities are summarized in the form of reprints or abstracts of 46 papers citing support from the DOE center grant that were produced during the reporting period. These papers include those that are published, in press, submitted, or in preparation. The papers include those produced entirely by CCRC personnel and those papers representing research work conducted in collaboration with scientists at other institutions. (See Appendix I.) A major component of this grant is to provide service to researchers atmore » other academic institutions and industries located throughout the US and other parts of the world. A summary of all our service activities during the reporting period is also included with this report, including samples of poly/oligosaccharides and antibodies distributed to scientists (see Appendix II). A description of the three training courses held at the CCRC during 2003 is also provided, together with the names and affiliations of participants who attended the courses (see Appendix III).« less
Air Force Handbook: 108th Congress First Session
2003-01-01
are eliminated with the exception of mental health . • FY2003 NDAA authorized expansion of TRICARE Prime Remote to eligible family members who do not...System is also in place to nurture their emotional/ mental health . Discussion • AFMS is a key to the Air Force’s Integrated Deliver System that unites...14 Deployment Health Surveillance .............. 16 Depot Maintenance Strategy and Master Plan
NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results
NASA Technical Reports Server (NTRS)
Clark, John S.; Wickenheiser, Timothy J.; Doherty, Michael P.; Marshall, Albert; Bhattacharryya, Samit K.; Warren, John
1992-01-01
Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.
Summaries of FY 1995 geosciences research
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-12-01
The summaries in this document, prepared by the investigators, describe the scope of the individual programs. The Geosciences Research Program includes research in geophysics, geochemistry, resource evaluation, solar-terrestrial interactions, and their subdivisions including earth dynamics, properties of earth materials, rock mechanics, underground imaging, rock-fluid interactions, continental scientific drilling, geochemical transport, solar/atmospheric physics, and modeling, with emphasis on the interdisciplinary areas. All such research is related either direct or indirect to the Department of Energy`s long-range technological needs.
FY2013 Progress Report for Fuel & Lubricant Technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2014-02-01
Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.
FY2014 Fuel & Lubricant Technologies Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stork, Kevin
2016-02-01
Annual progress report for Fuel & Lubricant Technologies. The Fuel & Lubricant Technologies Program supports fuels and lubricants research and development (R&D) to provide vehicle manufacturers and users with cost-competitive options that enable high fuel economy with low emissions, and contribute to petroleum displacement.
Progressive Tinnitus Management Level 3 Skills Education: A 5-Year Clinical Retrospective.
Edmonds, Catherine M; Ribbe, Cheri; Thielman, Emily J; Henry, James A
2017-09-18
The primary purpose of this study was to determine whether progressive tinnitus management Level 3 skills education workshops conducted at the Bay Pines and Boston Veterans Affairs hospitals result in consistent use of the presented tinnitus management strategies by patients 1-5 years after completing the workshops. In fiscal year (FY) 2015, the tinnitus workshop follow-up form was mailed to all veterans who completed the Level 3 workshops between FY 2010 and FY 2014. Data were compiled to determine which, if any, of the skills taught in the workshops were being used 1-5 years after completion of the workshops and the impact on quality-of-life indicators. All self-management skills were being utilized up to 5 years postcompletion; therapeutic sound was utilized the most. The majority of patients reported an improved ability to manage reactions to tinnitus and improved quality-of-life indicators. Over 90% of patients from both sites recommended the program to others with tinnitus. The self-management skills taught in the progressive tinnitus management Level 3 workshops are sustained over time even when limited resources prevent the full complement of workshops or the involvement of mental health services. The workshops can also be successfully implemented through remote delivery via videoconferencing (telehealth). https://doi.org/10.23641/asha.5370883.
Department of Clinical Investigation Annual Research Progress Report, FY 1992
1992-09-30
and DES. Patients with a history of deep vein thrombosis, cerebral embolus, stroke , congestive heart failure, or ischemic heart disease will not be...Tracheal Epithelial Injury and Regeneration Following Endotracheal Suctioning. PRINICIPAL INVESTIGATOR: COL Barbara S. Turner, AN 4 4 U U EXTRAMURAL...Suctioning in Adults with Head Injury . Heart Baun M, Stone KS, and Lung 20(6): 667-74, 1991. Brucia JI 11I! PUBLICATIONS - MAMC - FY 92 1 Stowe HO Into
Insensitive Munitions Advanced Development FY 89 Program Plan
1989-01-01
reduced vulnerability. The development of castable, moderately energetic explosives such as PBXN - 106 , PBXN -107, and PBX(AF)-108 I for fragment...PROGRESS: Following the successful processing of PBXN - 106 and PBXN -109 in a 37mm Werner Pfleiderer continuous mixer/extruder under contract (ICT/FRG) within...the FY86/87 timeframe, the installation of a similar setup was completed at NSWC and the first live mix ( PBXN - 106 ) was processed during the second
Family Strengthening Research: FY2014. OPRE Report 2015-22
ERIC Educational Resources Information Center
Administration for Children & Families, 2015
2015-01-01
This report provides detailed summaries of major research investments by OPRE's Division of Family Strengthening (DFS) along with brief overviews of past projects. The featured projects cover topics that include strengthening relationships within families, supporting fatherhood, nurturing children through their families, reducing teen pregnancy,…
75 FR 11836 - Bioenergy Program for Advanced Biofuels
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... (NOCP); additional payment for advanced biofuel produced from October 1, 2008 through September 30, 2009. SUMMARY: RBS is announcing additional payments to advanced biofuel producers determined eligible in Fiscal... biofuel produced in FY 2009, the request must include: Form RD 9005-3, ``Advanced Biofuel Program Payment...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... to demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act... the NDAA for FY 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects...
75 FR 24711 - Fiscal Year (FY) 2010 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-05
... Assistance Center for Mental Health Promotion and Youth Violence Prevention. SUMMARY: This notice is to... Mental Health Promotion and Youth Violence Prevention. This is not a formal request for applications... Promotion and Youth Violence Prevention based on the receipt of a satisfactory application that is approved...
FY 1978 aeronautics and space technology program summary
NASA Technical Reports Server (NTRS)
1977-01-01
Highlights of the aeronautics program include research on aircraft energy efficiency, supersonic cruise aircraft, vertical takeoff and landing aircraft, short haul/short takeoff and landing aircraft, and general aviation aircraft. The space technology program includes work on space structures, propulsion systems, power systems, materials, and electronics.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-19
... VTCLI supports the Obama Administration's priority of supporting America's veterans and military... Living Initiative Competitive Grant Program Funds: Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces the selection of projects...
Curriculum Summary: Grade One, 2003-2004 = Sommaire des Programmes: 1re annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 1 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover health and life skills, physical…
76 FR 41501 - Notice of Intent To Award Affordable Care Act (ACA) Funding, EH09-907
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Centers for Disease Control and Prevention Notice of... Prevention (CDC), Department of Health and Human Services (HHS). ACTION: Notice. SUMMARY: This notice... in their FY 2011 applications submitted under funding opportunity EH09-907, ``National Environmental...
2009-06-08
Security Grant Program ...............................................................................6 Intercity Passenger Rail Program (Amtrak...6 Intercity Bus Security Grant Program...fy2009.pdf. 19 Additionally Amtrak is eligible to receive funding to continue security enhancements for its intercity rail services between high-risk
2009-08-05
Freight Rail Security Grant Program ...............................................................................6 Intercity Passenger Rail Program...Amtrak) .....................................................................6 Intercity Bus Security Grant Program...overview- fy2009.pdf. 19 Additionally Amtrak is eligible to receive funding to continue security enhancements for its intercity rail services
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... programs, Homeless Management Information System (HMIS) data collection, reporting and research, including..., HUD. ACTION: Notice. SUMMARY: HUD announces the availability of the applicant information, deadline information, and other requirements for the Fiscal Year (FY) 2010 Special Needs Assistance Programs Technical...
77 FR 70204 - Senior Executive Service: Performance Review Board Members
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-23
... SMALL BUSINESS ADMINISTRATION Senior Executive Service: Performance Review Board Members AGENCY: U.S. Small Business Administration. ACTION: Notice of Members for the FY 2012 Performance Review Board. SUMMARY: Title 5 U.S.C. 4314(c)(4) requires each agency to publish notification of the appointment of...
78 FR 52995 - Senior Executive Service: Performance Review Board Members
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... SMALL BUSINESS ADMINISTRATION Senior Executive Service: Performance Review Board Members AGENCY: U. S. Small Business Administration. ACTION: Notice of Members for the FY 2014 Performance Review Board. SUMMARY: Title 5 U.S.C. 4314(c)(4) requires each agency to publish notification of the appointment of...
DOT National Transportation Integrated Search
2011-12-01
The purpose of this report is to provide a summary and back-up information on the methodology, data sources, and results for the estimate of Intelligent Transportation Systems (ITS) capital expenditures in the top 75 metropolitan areas as of FY 2010....
Fuel Cell Electric Vehicle Evaluation; NREL (National Renewable Energy Laboratory)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kurtz, Jennifer; Sprik, Sam; Ainscough, Chris
2015-06-10
This presentation provides a summary of NREL's FY15 fuel cell electric vehicle evaluation project activities and accomplishments. It was presented at the U.S. Department of Energy Hydrogen and Fuel Cells Program 2015 Annual Merit Review and Peer Evaluation Meeting on June 10, 2015, in Arlington, Virginia.
78 FR 43220 - Fiscal Year (FY) 2013 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... Suicide Prevention Resource Center program. SUMMARY: This notice is to inform the public that the... supplement of approximately $583,330 (total costs) for up to one year to the current grantee of the Suicide... Suicide Prevention (NSSP) and to support the infrastructure of the National Action Alliance (Action...
77 FR 39247 - Fiscal Year (FY) 2012 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-02
... Suicide Prevention Resource Center (SPRC) program. SUMMARY: This notice is to inform the public that the... supplement of approximately $800,000 (total costs) for up to one year to the current grantee of the Suicide... enhance the level of support provided to the National Action Alliance for Suicide Prevention. This...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
... DEPARTMENT OF HEALTH AND HUMAN SERVICES Administration for Children and Families Request for Public Comment on Proposed Funding Opportunity Announcement for Special Initiative Concerning the Assets... of the AFI program and Individual Development Accounts (IDAs). SUMMARY: In FY 2011, the Office of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Proposed Waivers... Education, Department of Education. ACTION: Notice. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career and Technical Education Program (NACTEP), the Secretary proposes...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
..., Proposed Collection: State Library Administrative Agencies Survey, FY 2011-2013 AGENCY: Institute of Museum and Library Services, The National Foundation for the Arts and the Humanities. ACTION: Submission for OMB Review, Comment Request. SUMMARY: The Institute of Museum and Library Services announces the...
78 FR 6827 - Public Availability of DHS Fiscal Year 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-31
... Inventory AGENCY: Office of the Chief Procurement Officer, DHS. ACTION: Notice of availability. SUMMARY: In... availability of the FY 2012 Service Contract inventory. This inventory provides information on service contract... contracted resources are distributed throughout the agency. The inventory has been developed in accordance...
77 FR 4821 - Public Availability of DHS Fiscal Year 2011 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-31
... Inventory AGENCY: Office of the Chief Procurement Officer, DHS. ACTION: Notice of availability. SUMMARY: In... availability of the FY 2011 Service Contract inventory. This inventory provides information on service contract... contracted resources are distributed throughout the agency. The inventory has been developed in accordance...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
... overall efficiency. The VTCLI supports the Obama Administration's priority of supporting America's.... SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces the... transportation resources to veterans, service members and military families and improve the accessibility of...
78 FR 5481 - Quagga Mussel Strategic Planning Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-HQ-FHC-2013-N008; 94140-1341-0000-N5] Quagga Mussel Strategic Planning Meeting AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of meeting. SUMMARY: This notice announces a meeting to gather information for planning an FY13 strategy to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... Requests: State Library Administrative Agencies Survey, FY 2014 AGENCY: Institute of Museum and Library..., collection of information. SUMMARY: The Institute of Museum and Library Service (``IMLS'') as part of its... purpose of this Notice is to solicit comments concerning the continuance of the State Library...
Integrated Disposal Facility FY2011 Glass Testing Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.
2011-09-29
Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 x 10{sup 5} m{sup 3} of glass (Certa and Wells 2010). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 8.9 x 10{sup 14} Bq total activity) of long-lived radionuclides, principally {sup 99}Tc (t{sub 1/2} = 2.1 x 10{sup 5}), plannedmore » for disposal in a low-level waste (LLW) facility. Before the ILAW can be disposed, DOE must conduct a performance assessment (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2011 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses.« less
Cai, Xixi; Lin, Jiaping; Wang, Shaoyun
2016-01-01
Peptide-calcium can probably be a suitable supplement to improve calcium absorption in the human body. In this study, a specific peptide Phe-Tyr (FY) with calcium-binding capacity was purified from Schizochytrium sp. protein hydrolysates through gel filtration chromatography and reversed phase HPLC. The calcium-binding capacity of FY reached 128.77 ± 2.57 μg/mg. Results of ultraviolet spectroscopy, fluorescence spectroscopy, and infrared spectroscopy showed that carboxyl groups, amino groups, and amido groups were the major chelating sites. FY-Ca exhibited excellent thermal stability and solubility, which were beneficial to be absorbed and transported in the basic intestinal tract of the human body. Moreover, the calcium bioavailability in Caco-2 cells showed that FY-Ca could enhance calcium uptake efficiency by more than three times when compared with CaCl2, and protect calcium ions against dietary inhibitors, such as tannic acid, oxalate, phytate, and Zn2+. Our findings further the progress of algae-based peptide-calcium, suggesting that FY-Ca has the potential to be developed as functionally nutraceutical additives. PMID:28036002
Mirando, M A
2007-03-01
The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.
Pacific Northwest Laboratory annual report for 1990 to the DOE Office of Energy Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Owczarski, E.L.
At the start of FY 1990, the atmospheric sciences and carbon dioxide research programs within the Office of Health and Environmental Research (OHER) were gathered into the new Atmospheric and Climate Research Division (ACRD). One of the central missions of this new division is to provide the Department of Energy with scientifically defensible information on the local, regional, and global distributions of energy-related pollutants and their effects on climate. This information is vital to the definition and implementation of a sound national energy strategy. Because much of the work done at PNL during FY 1990 falls under the umbrella ofmore » the new ACRD, we are including in this volume the progress and status reports for all OHER atmospheric and climate research projects at PNL. The description of ongoing atmospheric and climate research at PNL is organized along two broad research areas; atmospheric research and climate research. This report describes the progress in FY 1990 in each of these areas. A divider page summarizes the goals of each area and lists projects that support research activities.« less
US Army Medical Bioengineering Research and Development Laboratory Annual Progress Report for FY 83.
1983-10-01
Army consumes is chlorinated. Also, the water from Army wastewater treatment plants is chlorinated before it is returned to the environment.I Because...12K; CY - K; BY - OK PROBLEM DEFINITION: Chlorination of drinking water and of effluents from wastewater treatment plants is standard practice employed...FY81 indicated no research - activity on this type of photocell. Materials and chemicals have been ordered and assembled. A preliminary cell has been
DOE Office of Scientific and Technical Information (OSTI.GOV)
OGEKA,G.J.
1998-12-31
In FY 1998, the BNL LDBD Program funded 20 projects, 4 of which were new starts, at a total cost of $2,563,681. The small number of new starts was a consequence of severe financial problems that developed between FY 1997 and 1998. Emphasis was given to complete funding for approved multi-year proposals. Following is a table which lists all of the FY 1998 funded projects and gives a history of funding for each by year. Several of these projects have already experienced varying degrees of success as indicated in the individual Project Program Summaries which follow. A total of 17more » informal publications (abstracts, presentations, BNL reports and workshop papers) were reported and an additional 13 formal (full length) papers were either published, are in press or being prepared for publication. The investigators on five projects have filed for a patent. Seven of the projects reported that proposals/grants had either been funded or were submitted for funding. In conclusion, a significant measure of success is already attributable to the FY 1998 LDBD Program in the short period of time involved. The Laboratory has experienced a significant scientific gain by these achievements.« less
Environmental Sciences Division annual progress report for period ending September 30, 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-12-31
This progress report summarizes the research and development activities conducted in the Environmental Sciences Division (ESD) of Oak Ridge National Laboratory during fiscal year (FY) 1994, which extended from October 1, 1993, through September 30, 1994. The report is structured to provide descriptions of current activities and accomplishments in each of the division`s major organizational units. Following the sections describing the organizational units are sections highlighting ESD Scientific, Technical, and Administrative Achievement awards and listing information necessary to covey the scope of the work in the division. An organizational chart of staff and long-term guests who wee in ESD atmore » the end of FY 1994 is located in the final section of the report.« less
2003-01-01
The approach being pursued, under this program structure, is to eliminate the use of physical surfaces on the component as datum. The use of physical...will eliminate /minimize fretting and low-cycle fatigue and the blade-disk interface. This optimum coating and/or coating process will be evaluated both...Utilizes MCLB infrastructure Avoids costs associated with existing APCS Biofiltration produces no secondary emissions Biofiltration is the most
Project #OPE-FY15-0018, January 20, 2015. The EPA OIG plans to begin preliminary research on EPA’s progress in meeting minimum inspection requirements under the RCRA at treatment, storage and disposal facilities (TSDFs).
Curriculum Summary: Grade Six, 2003-2004 = Sommaire des Programmes: 6e annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 6 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover art, music, health and life skills,…
Curriculum Summary: Grade Four, 2003-2004 = Sommaire des Programmes: 4e annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 4 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover art, music, health and life skills,…
Curriculum Summary: Grade Three, 2003-2004 = Sommaire des Programmes, 3e annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 3 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover art, music, health and life skills,…
Curriculum Summary: Grade Two, 2003-2004 = Sommaire des Programmes: 2e annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 2 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover art, music, health and life skills,…
Curriculum Summary: Grade Five, 2003-2004 = Sommaire des Programmes: 5e annee, 2003-2004.
ERIC Educational Resources Information Center
Alberta Learning, Edmonton.
Intended for parents as a companion to the Alberta Curriculum Guides, this summary, in English- and French-language versions, uses an "at a glance" schematic to list the curricular goals for Grade 5 in Alberta. In addition to English language arts, mathematics, science, and social studies, goals cover art, music, health and life skills, physical…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zheng, Liange; Li, Lianchong; Rutqvist, Jonny
Clay/shale has been considered as potential host rock for geological disposal of high-level nuclear waste throughout the world, because of its low permeability, low diffusion coefficient, high retention capacity for radionuclides, and capability to self-seal fractures induced by tunnel excavation. For example, Callovo-Oxfordian argillites at the Bure site, France (Fouche et al., 2004), Toarcian argillites at the Tournemire site, France (Patriarche et al., 2004), Opalinus Clay at the Mont Terri site, Switzerland (Meier et al., 2000), and Boom clay at the Mol site, Belgium (Barnichon and Volckaert, 2003) have all been under intensive scientific investigation (at both field and laboratorymore » scales) for understanding a variety of rock properties and their relationships to flow and transport processes associated with geological disposal of nuclear waste. Clay/shale formations may be generally classified as indurated or plastic clays (Tsang and Hudson, 2010). The latter (including Boom clay) is a softer material without high cohesion; its deformation is dominantly plastic. During the lifespan of a clay repository, the repository performance is affected by complex thermal, hydrogeological, mechanical, chemical (THMC) processes, such as heat release due to radionuclide decay, multiphase flow, formation of damage zones, radionuclide transport, waste dissolution, and chemical reactions. All these processes are related to each other. An in-depth understanding of these coupled processes is critical for the performance assessment (PA) of the repository. These coupled processes may affect radionuclide transport by changing transport paths (e.g., formation and evolution of excavation damaged zone (EDZ)) and altering flow, mineral, and mechanical properties that are related to radionuclide transport. While radionuclide transport in clay formation has been studied using laboratory tests (e,g, Appelo et al. 2010, Garcia-Gutierrez et al., 2008, Maes et al., 2008), short-term field tests (e.g. Garcia-Gutierrez et al. 2006, Soler et al. 2008, van Loon et al. 2004, Wu et al. 2009) and numerical modeling (de Windt et al. 2003; 2006), the effects of THMC processes on radionuclide transport are not fully investigated. The objectives of the research activity documented in this report are to improve a modeling capability for coupled THMC processes and to use it to evaluate the THMC impacts on radionuclide transport. This research activity addresses several key Features, Events and Processes (FEPs), including FEP 2.2.08, Hydrologic Processes, FEP 2.2.07, Mechanical Processes and FEP 2.2.09, Chemical Process— Transport, by studying near-field coupled THMC processes in clay/shale repositories and their impacts on radionuclide transport. This report documents the progress that has been made in FY12. Section 2 discusses the development of THMC modeling capability. Section 3 reports modeling results of THMC impacts on radionuclide transport. Planned work for the remaining months of FY12 and proposed work for FY13 are presented in Section 4.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2011. The associated FY 2011 ORNL LDRD Self-Assessment (ORNL/PPA-2012/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The Laboratory Directed Research and Development (LDRD) program at Oak Ridge National Laboratory (ORNL) reports its status to the U.S. Department of Energy (DOE) in March of each year. The program operates under the authority of DOE Order 413.2B, “Laboratory Directed Research and Development” (April 19, 2006), which establishes DOE’s requirements for the program while providing the Laboratory Director broad flexibility for program implementation. LDRD funds are obtained through a charge to all Laboratory programs. This report includes summaries of all ORNL LDRD research activities supported during FY 2010. The associated FY 2010 ORNL LDRD Self-Assessment (ORNL/PPA-2011/2) provides financial datamore » and an internal evaluation of the program’s management process.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hanrahan, T.P.
2009-01-08
The Bonneville Power Administration (BPA) Project 2003-038-00, Evaluate the restoration potential of Snake River fall Chinook salmon spawning habitat, began in FY04 (15 December 2003) and continues into FY06. This status report is intended to summarize accomplishments during FY04 and FY05. Accomplishments are summarized by Work Elements, as detailed in the Statement of Work (see BPA's project management database PISCES). This project evaluates the restoration potential of mainstem habitats for fall Chinook salmon. The studies address two research questions: 'Are there sections not currently used by spawning fall Chinook salmon within the impounded lower Snake River that possess the physicalmore » characteristics for potentially suitable fall Chinook spawning habitat?' and 'Can hydrosystem operations affecting these sections be adjusted such that the sections closely resemble the physical characteristics of current fall Chinook salmon spawning areas in similar physical settings?' Efforts are focused at two study sites: (1) the Ice Harbor Dam tailrace downstream to the Columbia River confluence, and (2) the Lower Granite Dam tailrace. Our previous studies indicated that these two areas have the highest potential for restoring Snake River fall Chinook salmon spawning habitat. The study sites will be evaluated under existing structural configurations at the dams (i.e., without partial removal of a dam structure), and alternative operational scenarios (e.g., varying forebay/tailwater elevations). The areas studied represent tailwater habitat (i.e., riverine segments extending from a dam downstream to the backwater influence from the next dam downstream). We are using a reference site, indicative of current fall Chinook salmon spawning areas in tailwater habitat, against which to compare the physical characteristics of each study site. The reference site for tailwater habitats is the section extending downstream from the Wanapum Dam tailrace on the Columbia River. Escapement estimates for fall of 2000 indicate more than 9000 adult fall Chinook salmon returned to this area, accounting for more than 2100 redds within a 5 km section of river.« less
Building America Systems Integration Research Annual Report. FY 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gestwick, Michael
2013-05-01
This Building America FY2012 Annual Report includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.
Used Fuel Disposition in Crystalline Rocks: FY16 Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wang, Y.; Hadgu, Teklu; Kalinina, Elena Arkadievna
The objective of the Crystalline Disposal R&D Work Package is to advance our understanding of long-term disposal of used fuel in crystalline rocks and to develop necessary experimental and computational capabilities to evaluate various disposal concepts in such media. FY16 continued to be a successful year in both experimental and modeling arenas in evaluation of used fuel disposal in crystalline rocks. The work covers a wide range of research topics identified in the R&D plan.
NASA Technical Reports Server (NTRS)
1976-01-01
Enabling technology needs and other requirements to support space industrialization include: large space structures; fabrication and joining processes; single stage to orbit and heavy lift launch vehicles; nuclear and solar space power systems; robotics, manipulators, and teleoperators; biotechnology in space; artificial gravity; the utilization of lunar materials for construction; and the extraction of oxygen and metals from lunar resources. New initiatives (FY 1978) directly supportive or partly related to space industrialization are listed.
Integrated Disposal Facility FY2010 Glass Testing Summary Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pierce, Eric M.; Bacon, Diana H.; Kerisit, Sebastien N.
2010-09-30
Pacific Northwest National Laboratory was contracted by Washington River Protection Solutions, LLC to provide the technical basis for estimating radionuclide release from the engineered portion of the disposal facility (e.g., source term). Vitrifying the low-activity waste at Hanford is expected to generate over 1.6 × 105 m3 of glass (Puigh 1999). The volume of immobilized low-activity waste (ILAW) at Hanford is the largest in the DOE complex and is one of the largest inventories (approximately 0.89 × 1018 Bq total activity) of long-lived radionuclides, principally 99Tc (t1/2 = 2.1 × 105), planned for disposal in a low-level waste (LLW) facility.more » Before the ILAW can be disposed, DOE must conduct a performance assessement (PA) for the Integrated Disposal Facility (IDF) that describes the long-term impacts of the disposal facility on public health and environmental resources. As part of the ILAW glass testing program PNNL is implementing a strategy, consisting of experimentation and modeling, in order to provide the technical basis for estimating radionuclide release from the glass waste form in support of future IDF PAs. The purpose of this report is to summarize the progress made in fiscal year (FY) 2010 toward implementing the strategy with the goal of developing an understanding of the long-term corrosion behavior of low-activity waste glasses. The emphasis in FY2010 was the completing an evaluation of the most sensitive kinetic rate law parameters used to predict glass weathering, documented in Bacon and Pierce (2010), and transitioning from the use of the Subsurface Transport Over Reactive Multi-phases to Subsurface Transport Over Multiple Phases computer code for near-field calculations. The FY2010 activities also consisted of developing a Monte Carlo and Geochemical Modeling framework that links glass composition to alteration phase formation by 1) determining the structure of unreacted and reacted glasses for use as input information into Monte Carlo calculations, 2) compiling the solution data and alteration phases identified from accelerated weathering tests conducted with ILAW glass by PNNL and Viteous State Laboratory/Catholic University of America as well as other literature sources for use in geochemical modeling calculations, and 3) conducting several initial calculations on glasses that contain the four major components of ILAW-Al2O3, B2O3, Na2O, and SiO2.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nichols, W. E.
2016-03-24
In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1, and as implemented by DOE/RL-2000-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2015.
78 FR 13869 - Public Availability of Department of Energy FY 2012 Service Contract Inventory
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-01
....gov . Dated: February 6, 2013. Paul Bosco, Director, Office of Acquisition and Project Management. [FR... developed in accordance with guidance issued on November 5, 2010, by the Office of Management and Budget's... posted its inventory and a summary of the inventory at: http://energy.gov/management/downloads/service...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-03
... the agency. The inventory has been developed in accordance with guidance issued on November 5, 2010 by the Office of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is...-guidance-11052010.pdf . Department of Transportation has posted its inventory and a summary of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
.... The inventory has been developed in accordance with guidance issued on November 5, 2010 by the Office of Management and Budget's Office of Federal Procurement Policy (OFPP). OFPP's guidance is available...-guidance-11052010.pdf . Department of Transportation has posted its inventory and a summary of the...
75 FR 21300 - Fiscal Year (FY) 2010 Funding Opportunity
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-23
... National Center for Child Traumatic Stress. SUMMARY: This notice is to inform the public that the Substance... Stress (NCCTS). This is not a formal request for applications. Assistance will be provided only to the current grantee for the National Center for Child Traumatic Stress based on the receipt of a satisfactory...
School-Based Health Care State Policy Survey. Executive Summary
ERIC Educational Resources Information Center
National Assembly on School-Based Health Care, 2012
2012-01-01
The National Assembly on School-Based Health Care (NASBHC) surveys state public health and Medicaid offices every three years to assess state-level public policies and activities that promote the growth and sustainability of school-based health services. The FY2011 survey found 18 states (see map below) reporting investments explicitly dedicated…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-30
... Development and Research, HUD. ACTION: Notice of Final Fiscal Year (FY) 2012 Fair Market Rents (FMRs). SUMMARY... program staff. Questions on how to conduct FMR surveys or concerning further methodological explanations... Economic Affairs, Office of Policy Development and Research, telephone 202-708-0590. Persons with hearing...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, M. C.; Nichols, W. E.
2017-03-14
In accordance with U.S. Department of Energy (DOE) requirements in DOE O 435.1 and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2016.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoekstra, Robert J.; Hammond, Simon David; Hemmert, Karl Scott
The presentation documented the technical approach of the team and summary of the results with sufficient detail to demonstrate both the value and the completion of the milestone. A separate SAND report was also generated with more detail to supplement the presentation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... Electronic Device (CIED) Procedures c. New Candidate HAC Condition: Iatrogenic Pneumothorax With Venous Catheterization 6. RTI Program Evaluation Summary a. RTI Analysis of FY 2011 POA Indicator Reporting Across.... Hospital Inpatient Quality Reporting (IQR) Program 1. Background a. History of Measures Adopted for the...
Navy DDG-51 and DDG-1000 Destroyer Programs: Background and Issues for Congress
2015-12-17
Navy DDG- 51 and DDG-1000 Destroyer Programs: Background and Issues for Congress Ronald O’Rourke Specialist in Naval Affairs December 17......Congressional Research Service Summary The Navy has been procuring Arleigh Burke (DDG- 51 ) class Aegis destroyers since FY1985. The two DDG- 51 class
Student Aid in the Reagan Administration. Fact Sheet. Summary.
ERIC Educational Resources Information Center
American Council on Education, Washington, DC.
Federal appropriations during 1981-1985 for student financial aid are reviewed, along with the effect of the Omnibus Budget Reconciliation Act of 1981. The effective cut in need-based federal student aid for funding year (FY) 1981 totalled $600 million ($500 million Pell Grants, $100 million National Direct Student Loans). The Omnibus Budget…
2020 Vision Project Summary: FY99
DOE Office of Scientific and Technical Information (OSTI.GOV)
K.W. Gordon; K.P. Scott
2000-01-01
During the 1998-99 school year, students from participating schools completed and submitted a variety of scenarios describing potential world and regional conditions in the year 2020 and their possible effect on U.S. national security. This report summarizes the student's views and describes trends observed over the course of the 2020 Vision project's four years.
NASA/MSFC FY-83 Atmospheric Processes Research Review
NASA Technical Reports Server (NTRS)
Turner, R. E. (Compiler)
1983-01-01
The atmospheric processes research program was reviewed. Research tasks sponsored by the NASA Office of Space Science and Applications, Earth Sciences and Applications Division in the areas of upper atmosphere, global weather, and mesoscale processes are discussed. The are: the research project summaries, together with the agenda and other information about the meeting.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-29
... OFFICE OF SCIENCE AND TECHNOLOGY POLICY Request for Public Comment on Interagency Arctic Research Policy Committee (IARPC) Arctic Research Plan: FY2013-2017 May 22, 2012. ACTION: Request for public comment. SUMMARY: The Arctic Research and Policy Act of 1984 (ARPA), Public Law 98-373, established the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-23
... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...
76 FR 75563 - Notice for Delay of Payment of Title XII Interest for Three States
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... DEPARTMENT OF LABOR Employment and Training Administration Notice for Delay of Payment of Title.... SUMMARY: This notice announces the approval for delay of Title XII interest payment for three states... Title XII advances made during the last five months of the Federal fiscal year (FY) (May, June, July...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-01
...--Texas A&M University Corpus Christi (TAMUCC), College of Nursing and Health Science (CONHS). SUMMARY... Credit for Nursing Education Programs, and undertake a dissemination program to advance the goal of aligning enlisted health care training with civilian nursing program requirements. In fiscal year (FY) 2012...
77 FR 55811 - Manufacturing Extension Partnership Advisory Board On-line Open Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... Partnership Advisory Board On-line Open Meeting AGENCY: National Institute of Standards and Technology (NIST), Commerce ACTION: Notice of open meeting. SUMMARY: The National Institute of Standards and Technology (NIST... August 29, 2012, 2) an update on the NIST MEP FY 2013 budget, and 3) updates on changes to NIST MEP's...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
...: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Proposed rule. SUMMARY: This proposed rule..., especially the teaching status adjustment factor. Therefore, we implemented a 3-year moving average approach... moving average to calculate the facility-level adjustment factors. For FY 2011, we issued a notice to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-23
... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...
7 CFR 3402.12 - Project summary.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 15 2012-01-01 2012-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...
7 CFR 3402.12 - Project summary.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 15 2014-01-01 2014-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...
7 CFR 3402.12 - Project summary.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 15 2013-01-01 2013-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form NIFA-2003, applicants must summarize...
7 CFR 3402.12 - Project summary.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 15 2011-01-01 2011-01-01 false Project summary. 3402.12 Section 3402.12 Agriculture... AGRICULTURAL SCIENCES NATIONAL NEEDS GRADUATE AND POSTGRADUATE FELLOWSHIP GRANTS PROGRAM Preparation of an Application § 3402.12 Project summary. Using the Project Summary, Form CSREES-2003, applicants must summarize...
Wind Powering America FY07 Activities Summary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2008-02-01
The Wind Powering America FY07 Activities Summary reflects the accomplishments of our state wind working groups, our programs at the National Renewable Energy Laboratory, and our partner organizations. The national WPA team remains a leading force for moving wind energy forward in the United States. WPA continues to work with its national, regional, and state partners to communicate the opportunities and benefits of wind energy to a diverse set of stakeholders. WPA now has 30 state wind working groups (welcoming Georgia and Wisconsin in 2007) that form strategic alliances to communicate wind's benefits to the state stakeholders. More than 140more » members of national and state public and private sector organizations from 39 U.S. states and Canada attended the 6th Annual WPA All-States Summit in Los Angeles in June. WPA's emphasis remains on the rural agricultural sector, which stands to reap the significant economic development benefits of wind energy development. Additionally, WPA continues its program of outreach, education, and technical assistance to Native American communities, public power entities, and regulatory and legislative bodies.« less
Conservation and solar energy program: congressional budget request, FY 1982
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1981-01-01
Funding summaries are presented for the Conservation and Solar Energy Program funding information and program overview on energy conservation (Volume 7 of 7, DOE/CR-0011/2) are included for the Buildings and Community Systems, Industrial, Transportation; State and Local, Multi-Sector, Energy Impact Assistance, and Residential/Commercial retrofit programs. Funding information and program overviews on solar technology (Volume 2 of 7, DOE/CR-011/2) are included for Active and Passive Solar Heating and Cooling, Photovoltaics Energy Systems, Solar Thermal Power Systems, Biomass Energy Systems, Wind Energy Conversion Systems, Ocean Systems, Solar International Activities, Solar Information Systems, SERI Facility, MX-RES, Program Direction, and Alcohol Fuels programs. Informationmore » and overviews on energy production, demonstration, and distribution (Volume 6 of 7, DOE/CR-0011/2) are given for the solar program. A funding summary and a program overview are included for electrochemical and physical and chemical storage systems as appearing in DOE/CR-0011/2, Volume 3 of 7. Relevant tabulated data from the FY 1981. Request to the Congress are presented for Supplementals, Rescissions, and Deferrals. (MCW)« less
Studies and Reports Relating to Training and Education, FY 1968.
ERIC Educational Resources Information Center
Civil Service Commission, Washington, DC.
The 1968 directory of Federal training and education programs has been compiled to encourage wider use of findings by other agencies, to avoid duplication of research efforts, and to stimulate experimentation needed to keep pace with technological progress. Federal agencies report both completed and in-progress studies and include such agencies as…
Straight A's: Public Education Policy and Progress. Volume 11, Number 5
ERIC Educational Resources Information Center
Amos, Jason, Ed.
2011-01-01
"Straight A's: Public Education Policy and Progress" is a biweekly newsletter that focuses on education news and events both in Washington, DC and around the country. The following articles are included in this issue: (1) Waiting Game Continues for FY 2011 Appropriations: Short-Term Spending Measure Averts Government Shutdown, Postpones…
Straight A's: Public Education Policy and Progress. Volume 10, Number 3
ERIC Educational Resources Information Center
Alliance for Excellent Education, 2010
2010-01-01
"Straight A's: Public Education Policy and Progress" is a biweekly newsletter that focuses on education news and events both in Washington, DC and around the country. The following articles are included in this issue: (1) Obama Releases FY 2011 Budget: Obama's 7.5 Percent Increase for Education Programs Signals Commitment to Reauthorize…
Straight A's: Public Education Policy and Progress. Volume 11, Number 7
ERIC Educational Resources Information Center
Amos, Jason, Ed.
2011-01-01
"Straight A's: Public Education Policy and Progress" is a biweekly newsletter that focuses on education news and events both in Washington, DC and around the country. The following articles are included in this issue: (1) FY 2011 Spending Discussions Continue: Pressure Mounts as April 8 Deadline Approaches and Possibility of Government Shutdown…
Foreign Operations Appropriations: General Provisions
2009-04-30
of which falls into arrears . Introduced on the floor by Senator Brooke (no amendment number assigned), March 23, 1976; adopted by Unanimous...Subsec. (c): Brought to the floor of the House for up/down vote (H.R. 1105), February 23, 2009. Sec. 7031. Debt -for-Development Similar language first...Engage in Debt Buybacks or Sales Similar language first enacted as sec. 571 of Foreign Ops, 1996, continued with the exception of FY2003
Commercial Sensory Survey Radiation Testing Progress Report
NASA Technical Reports Server (NTRS)
Becker, Heidi N.; Dolphic, Michael D.; Thorbourn, Dennis O.; Alexander, James W.; Salomon, Phil M.
2008-01-01
The NASA Electronic Parts and Packaging (NEPP) Program Sensor Technology Commercial Sensor Survey task is geared toward benefiting future NASA space missions with low-cost, short-duty-cycle, visible imaging needs. Such applications could include imaging for educational outreach purposes or short surveys of spacecraft, planetary, or lunar surfaces. Under the task, inexpensive commercial grade CMOS sensors were surveyed in fiscal year 2007 (FY07) and three sensors were selected for total ionizing dose (TID) and displacement damage dose (DDD) tolerance testing. The selected sensors had to meet selection criteria chosen to support small, low-mass cameras that produce good resolution color images. These criteria are discussed in detail in [1]. This document discusses the progress of radiation testing on the Micron and OmniVision sensors selected in FY07 for radiation tolerance testing.
CEMENTITIOUS BARRIERS PARTNERSHIP FY13 MID-YEAR REPORT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burns, H.; Flach, G.; Langton, C.
2013-05-01
In FY2013, the Cementitious Barriers Partnership (CBP) is continuing in its effort to develop and enhance software tools demonstrating tangible progress toward fulfilling the objective of developing a set of tools to improve understanding and prediction of the long-term structural, hydraulic and chemical performance of cementitious barriers used in nuclear applications. In FY2012, the CBP released the initial inhouse “Beta-version” of the CBP Software Toolbox, a suite of software for simulating reactive transport in cementitious materials and important degradation phenomena. The current primary software components are LeachXS/ORCHESTRA, STADIUM, and a GoldSim interface for probabilistic analysis of selected degradation scenarios. THAMESmore » is a planned future CBP Toolbox component (FY13/14) focused on simulation of the microstructure of cementitious materials and calculation of resultant hydraulic and constituent mass transfer parameters needed in modeling. This past November, the CBP Software Toolbox Version 1.0 was released that supports analysis of external sulfate attack (including damage mechanics), carbonation, and primary constituent leaching. The LeachXS component embodies an extensive material property measurements database along with chemical speciation and reactive mass transport simulation cases with emphasis on leaching of major, trace and radionuclide constituents from cementitious materials used in DOE facilities, such as Saltstone (Savannah River) and Cast Stone (Hanford), tank closure grouts, and barrier concretes. STADIUM focuses on the physical and structural service life of materials and components based on chemical speciation and reactive mass transport of major cement constituents and aggressive species (e.g., chloride, sulfate, etc.). The CBP issued numerous reports and other documentation that accompanied the “Version 1.0” release including a CBP Software Toolbox User Guide and Installation Guide. These documents, as well as, the presentations from the CBP Software Toolbox Demonstration and User Workshop, which are briefly described below, can be accessed from the CBP webpage at http://cementbarriers.org/. The website was recently modified to describe the CBP Software Toolbox and includes an interest form for application to use the software. The CBP FY13 program is continuing research to improve and enhance the simulation tools as well as develop new tools that model other key degradation phenomena not addressed in Version 1.0. Also efforts to continue to verify the various simulation tools thru laboratory experiments and analysis of field specimens are ongoing to quantify and reduce the uncertainty associated with performance assessments are ongoing. This mid-year report also includes both a summary on the FY13 software accomplishments in addition to the release of Version 1.0 of the CBP Software Toolbox and the various experimental programs that are providing data for calibration and validation of the CBP developed software. The focus this year for experimental studies was to measure transport in cementitious material by utilization of a leaching method and reduction capacity of saltstone field samples. Results are being used to calibrate and validate the updated carbonation model.« less
Implementation of a new algorithm for Density Equalizing Map Projections (DEMP)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Close, E.R.; Merrill, D.W.; Holmes, H.H.
The purpose of the PAREP (Populations at Risk to Environmental Pollution) Project at Lawrence Berkeley National Laboratory (LBNL), an ongoing Department of Energy (DOE) project since 1978, is to develop resources (data, computing techniques, and biostatistical methodology) applicable to DOE`s needs. Specifically, the PAREP project has developed techniques for statistically analyzing disease distributions in the vicinity of supposed environmental hazards. Such techniques can be applied to assess the health risks in populations residing near DOE installations, provided adequate small-area health data are available. The FY 1994 task descriptions for the PAREP project were determined in discussions at LBNL on 11/2/93.more » The FY94 PAREP Work Authorization specified three major tasks: a prototype small area study, a feasibility study for obtaining small-area data, and preservation of the PAREP data archive. The complete FY94 work plan, and the subtasks accomplished to date, were included in the Cumulative FY94 progress report.« less
Mars Tumbleweed: FY2003 Conceptual Design Assessment
NASA Technical Reports Server (NTRS)
Antol, Jeffrey; Calhoun, Philip C.; Flick, John J.; Hajos, Gregory a.; Keys, Jennifer P.; Stillwagen, Frederic H.; Krizan, Shawn A.; Strickland, Christopher V.; Owens, Rachel; Wisniewski, Michael
2005-01-01
NASA LaRC is studying concepts for a new type of Mars exploration vehicle that would be propelled by the wind. Known as the Mars Tumbleweed, it would derive mobility through use of the Martian surface winds. Tumbleweeds could conceivably travel greater distances, cover larger areas of the surface, and provide access to areas inaccessible by conventional vehicles. They would be lightweight and relatively inexpensive, allowing a multiple vehicle network to be deployed on a single mission. Tumbleweeds would be equipped with sensors for conducting science and serve as scouts searching broad areas to identify specific locations for follow-on investigation by other explorers. An extensive assessment of LaRC Tumbleweed concepts was conducted in FY03, including refinement of science mission scenarios, definition of supporting subsystems (structures, power, communications), testing in wind tunnels, and development of a dynamic simulation capability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Durham, Robin E.; Becker, James M.
This document provides a review and status of activities conducted in support of the Fluor Daniel Hanford Company (Fluor), now Mission Support Alliance (MSA), Mitigation Action Plan (MAP) for Project L-325, Electrical Utility Upgrades (2007). Three plantings have been installed on a 4.5-hectare mitigation area to date. This review provides a description and chronology of events, monitoring results, and mitigative actions through fiscal year (FY) 2012. Also provided is a review of the monitoring methods, transect layout, and FY 2012 monitoring activities and results for all planting years. Planting densities and performance criteria stipulated in the MAP were aimed atmore » a desired future condition (DFC) of 10 percent mature sagebrush (Artemisia tridentata ssp wyomingensis) cover. Current recommendations for yielding this DFC are based upon a conceptual model planting of 1000 plants/ha (400/ac) exhibiting a 60-percent survival rate after 5 monitoring years (DOE 2003). Accordingly, a DFC after 5 monitoring years would not be less than 600 plants/ha (240/ac). To date, about 8700 sagebrush plants have been grown and transplanted onto the mitigation site. Harsh site conditions and low seedling survival have resulted in an estimated 489 transplants/ha on the mitigation site, which is 111 plants/ha short of the target DFC. Despite this apparent shortcoming, 71, 91, and 24 percent of the surviving seedlings planted in FY 2007 and FY 2008 and FY 2010, respectively, showed signs of blooming in FY 2012. Blooming status may be a positive indication of future sagebrush recruitment, and is therefore a potential source for reaching the target DFC of 600 plants/ha on this mitigation site over time. Because of the difficulty establishing small transplants on this site, we propose that no additional plantings be considered for this mitigation area and to rely upon the potential recruitment by established seedlings to achieve the mitigation commitment set forth in the MAP of 600 plants/ha.« less
Microgravity science and applications: Program tasks and bibliography for FY 1992
NASA Technical Reports Server (NTRS)
1993-01-01
This report is a compilation of the FY 1992 Principal Investigator program task descriptions funded by the Microgravity Science and Applications Division (MSAD), NASA Headquarters, Washington, DC. The document also provides a bibliography of FY 1992 publications and presentations cited by MSAD Principal Investigators, and an index of the Principal Investigators and their affiliations. The purpose of the document is to provide an overview and progress report for the funded tasks for scientists and researchers in industry, university, and government communities. The tasks are grouped into three categories appropriate to the type of research being done-space flight, ground based, and advanced technology development-and by science discipline. The science disciplines are: biotechnology, combustion science,, electronic materials, fluid physics, fundamental physics, glass and ceramics, metals and alloys, and protein crystal growth.
NASA's Microgravity Research Program
NASA Technical Reports Server (NTRS)
Woodard, Dan
1998-01-01
This fiscal year (FY) 1997 annual report describes key elements of the NASA Microgravity Research Program (MRP) as conducted by the Microgravity Research Division (MRD) within NASA's Office of Life and Microgravity, Sciences and Applications. The program's goals, approach taken to achieve those goals, and program resources are summarized. All snapshots of the program's status at the end of FY 1997 and a review of highlights and progress in grounds and flights based research are provided. Also described are major space missions that flew during FY 1997, plans for utilization of the research potential of the International Space Station, the Advanced Technology Development (ATD) Program, and various educational/outreach activities. The MRP supports investigators from academia, industry, and government research communities needing a space environment to study phenomena directly or indirectly affected by gravity.
MFTF-. cap alpha. + T progress report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, W.D.
1985-04-01
Early in FY 1983, several upgrades of the Mirror Fusion Test Facility (MFTF-B) at Lawrence Livermore National Laboratory (LLNL) were proposed to the fusion community. The one most favorably received was designated MFTF-..cap alpha..+T. The engineering design of this device, guided by LLNL, has been a principal activity of the Fusion Engineering Design Center during FY 1983. This interim progress report represents a snapshot of the device design, which was begun in FY 1983 and will continue for several years. The report is organized as a complete design description. Because it is an interim report, some parts are incomplete; theymore » will be supplied as the design study proceeds. As described in this report, MFTF-..cap alpha..+T uses existing facilities, many MFTF-B components, and a number of innovations to improve on the physics parameters of MFTF-B. It burns deuterium-tritium and has a central-cell Q of 2, a wall loading GAMMA/sub n/ of 2 MW/m/sup 2/ (with a central-cell insert module), and an availability of 10%. The machine is fully shielded, allows hands-on maintenance of components outside the vacuum vessel 24 h after shutdown, and has provisions for repair of all operating components.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shott, Gregory
2014-03-01
The Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site (National Security Technologies, LLC 2007a) requires an annual review to assess the adequacy of the performance assessments (PAs) and composite analyses (CAs), with the results submitted to the U.S. Department of Energy (DOE) Office of Environmental Management. The Disposal Authorization Statements for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) also require that such reviews be made and that secondary or minor unresolved issues be tracked and addressed as part ofmore » the maintenance plan (DOE 1999a, 2000). The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office performed an annual review of the Area 3 and Area 5 RWMS PAs and CAs for fiscal year (FY) 2013. This annual summary report presents data and conclusions from the FY 2013 review, and determines the adequacy of the PAs and CAs. Operational factors (e.g., waste forms and containers, facility design, and waste receipts), closure plans, monitoring results, and research and development (R&D) activities were reviewed to determine the adequacy of the PAs. Likewise, the environmental restoration activities at the Nevada National Security Site (NNSS) relevant to the sources of residual radioactive material that are considered in the CAs, the land-use planning, and the results of the environmental monitoring and R&D activities were reviewed to determine the adequacy of the CAs. Important developments in FY 2013 include the following: • Development of a new Area 5 RWMS closure inventory estimate based on disposals through FY 2013 • Evaluation of new or revised waste streams by special analysis • Development of version 4.115 of the Area 5 RWMS GoldSim PA/CA model The Area 3 RWMS has been in inactive status since July 1, 2006, with the last shipment received in April 2006. The FY 2013 review of operations, facility design, closure plans, monitoring results, and R&D results for the Area 3 RWMS indicates no changes that would impact PA validity. The conclusion of the annual review is that all performance objectives can be met and the Area 3 RWMS PA remains valid. There is no need to the revise the Area 3 RWMS PA. Review of Area 5 RWMS operations, design, closure plans, monitoring results, and R&D activities indicates that no significant changes have occurred. The FY 2013 PA results, generated with the Area 5 RWMS v4.115 GoldSim PA model, indicate that there continues to be a reasonable expectation of meeting all performance objectives. The results and conclusions of the Area 5 RWMS PA are judged valid, and there is no need to the revise the PA. A review of changes potentially impacting the CAs indicates that no significant changes occurred in FY 2013. The continuing adequacy of the CAs was evaluated with the new models, and no significant changes that would alter the CAs results or conclusions were found. The revision of the Area 3 RWMS CA, which will include the Yucca Flat Underground Test Area (Corrective Action Unit [CAU] 97) source term, is scheduled for FY 2024, following the completion of the Corrective Action Decision Document/Corrective Action Plan in FY 2015. Inclusion of the Frenchman Flat Underground Test Area (CAU 98) results in the Area 5 RWMS CA is scheduled for FY 2016, pending the completion of the CAU 98 Closure Report in FY 2015. Near-term R&D efforts will focus on continuing development of the PA, CA, and inventory models for the Area 3 and Area 5 RWMS.« less
Basic Energy Sciences FY 2011 Research Summaries
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This report provides a collection of research abstracts for more than 1,300 research projects funded by the Office of Basic Energy Sciences (BES) in Fiscal Year 2011 at some 180 institutions across the U.S. This volume is organized along the three BES divisions: Materials Sciences and Engineering; Chemical Sciences, Geosciences, and Biosciences; and Scientific User Facilities.
NASA Technical Reports Server (NTRS)
Fody, Joshua M.; Daryabeigi, Kamran; Bruce, Walter E., III; Wells, John M.; Wusk, Mary E.; Calomino, Anthony M.; Miller, Steve D.
2018-01-01
Summary of highlights of the Convective Heating Improvement for Emergency Fire Shelters (CHIEFS) taskunder NASA. CHIEFS was tasked with providing the US Forest Service with an emergency fire shelter forimproved resistance to flame contact. Emphasis is on the final shelter designs at task close-out (end of FY17).
Basic Energy Sciences FY 2012 Research Summaries
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This report provides a collection of research abstracts and highlights for more than 1,400 research projects funded by the Office of Basic Energy Sciences (BES) in Fiscal Year 2012 at some 180 institutions across the U.S. This volume is organized along the three BES Divisions: Materials Sciences and Engineering; Chemical Sciences, Geosciences, and Biosciences; and Scientific User Facilities.
Basic Energy Sciences FY 2014 Research Summaries
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This report provides a collection of research abstracts and highlights for more than 1,200 research projects funded by the Office of Basic Energy Sciences (BES) in Fiscal Year 2014 at some 200 institutions across the U.S. This volume is organized along the three BES Divisions: Materials Sciences and Engineering; Chemical Sciences, Geosciences, and Biosciences; and Scientific User Facilities.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... be found using the Department of Housing and Urban Development agency link on the Grants.gov/Find Web... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5415-N-05] Notice of Availability... Development and Research, HUD. ACTION: Notice. SUMMARY: Through this notice, HUD announces the availability on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-28
... LEGAL SERVICES CORPORATION Notice of Intent To Award--Grant Awards for the Provision of Civil Legal Services to Eligible Low-Income Clients Beginning January 1, 2014 AGENCY: Legal Services Corporation. ACTION: Announcement of intention to make FY 2014 Competitive Grant Awards. SUMMARY: The Legal...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
... LEGAL SERVICES CORPORATION Notice of Intent to Award--Grant Awards for the Provision of Civil Legal Services to Eligible Low-Income Clients Beginning January 1, 2013 AGENCY: Legal Services Corporation. ACTION: Announcement of intention to make FY 2013 Competitive Grant Awards. SUMMARY: The Legal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-03
... LEGAL SERVICES CORPORATION Notice of Intent To Award--Grant Awards for the Provision of Civil Legal Services to Eligible Low-Income Clients Beginning January 1, 2012 AGENCY: Legal Services Corporation. ACTION: Announcement of intention to make FY 2012 Competitive Grant Awards. SUMMARY: The Legal...
Report on Fiscal and Compliance Accountability: Fiscal Year 1990-91. Report 92-2.
ERIC Educational Resources Information Center
California Community Colleges, Sacramento. Office of the Chancellor.
A summary of the results of various California community college financial audits and reviews for fiscal year (FY) 1990-91 are presented in this report. Section I explains the scope, purpose, and procedures of annual financial and compliance audits which are conducted to evaluate financial statements, encourage sound fiscal management practices,…
List of DOE radioisotope customers with summary of radioisotope shipments FY 1978
DOE Office of Scientific and Technical Information (OSTI.GOV)
Burlison, J.S.; Laidler, R.I.
1979-05-01
The purpose of the document is to list DOE's radioisotopes production and distribution activities by its facilities at Argonne National Laboratory; Pacific Northwest Laboratory; Brookhaven National Laboratory; Hanford Engineering Development Laboratory; Idaho Operations Office; Los Alamos Scientific Laboratory; Mound Facility; Oak Ridge National Laboratory; Savannah River Laboratory; and UNC Nuclear Industries, Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... Development and Research, HUD. ACTION: Notice of Final Fiscal Year (FY) 2014 Fair Market Rents (FMRs). SUMMARY.... Questions on how to conduct FMR surveys or concerning further methodological explanations may be addressed..., Office of Policy Development and Research, telephone 202-708-0590. Persons with hearing or speech...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-02
..., HUD. ACTION: Notice extension of deadline. SUMMARY: On August 26, 2010, HUD posted on http://www...--Round 1. Today's Federal Register notice announces that HUD has posted on http://www.Grants.gov a... to the Mapping Tool used to determine neighborhood eligibility. HUD will post on http://www.Grants...
76 FR 61074 - USDA Increases the Fiscal Year 2011 Tariff-Rate Quota for Refined Sugar
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-03
... Quota for Refined Sugar AGENCY: Office of the Secretary, USDA. ACTION: Notice. SUMMARY: The Secretary of Agriculture today announced an increase in the fiscal year (FY) 2011 refined sugar tariff-rate quota (TRQ) of... INFORMATION: A quantity of 22,000 MTRV for sugars, syrups, and molasses (collectively referred to as refined...
USACERL Executive Summary for FY93
1994-07-01
The model is significant because it provides a common airft technology to montoring protected habiats and denominator for translating ecological data...replacing rotted wood pilings. Commingled Recycled Plastics. USACERL led a consortium of universities, private-sector organizations,Specifications...of repairing or replacing dete- field review before publication as an Army standard. riorated metal, wood , concrete, and steel in waterfront The
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... Procurement Policy (OFPP). OFPP's guidance is available at http:// www.whitehouse.gov/sites/default/files... a summary of the inventory on the VA Web site at: http://www.va.gov/oal/library/scaInventory.asp... to Marilyn Harris, Director, Procurement Policy and Warrant Management Service, in the Office of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... grant program. This announcement contains the names and addresses of this FY 2009's award recipients... Awards for the HOPE VI Revitalization Grant Program for Fiscal Year 2009 AGENCY: Office of the Assistant Secretary for Public and Indian Housing, HUD. ACTION: Announcement of funding awards. SUMMARY: In accordance...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
... OFFICE OF GOVERNMENT ETHICS Solicitation of Input From Stakeholders Regarding the U.S. Office of Government Ethics Strategic Plan (FY 2014-2017) AGENCY: Office of Government Ethics (OGE). ACTION: Notice of Request for Public Comment. SUMMARY: The U.S. Office of Government Ethics (OGE) is providing notice of...
ERIC Educational Resources Information Center
Braddock, David; And Others
The report summarizes results from a mental retardation/developmental disabilities (MR/DD) expenditure analysis study. Three parts comprised the study: (1) the state government expenditure analysis which covered fiscal years (FY) 1977 through 1984, and dealt primarily with state general fund expenditures of the principal MR/DD state agency, the…
Technology Transfer Summary Report (FY92), Naval Surface Warfare Center Dahlgren Division
1994-04-20
communications; no formal records are kept of these. Community Technical Outreach NSWCDD participates in the "Science and Engineering Apprentice" and the " Bay ...ADMINISTRATOR’S OFFICE NAVAL UNDERSEA WARFARE CENTER PO BOX 545 DIVISION NEWPORT SEQUIM WA 98382 NEWPORI’ RI 02841-5047 ATTN GIFT AND EXCHANGE DIV 4 ATTN CODE 00
Summary of Computer Usage and Inventory of Computer Utilization in Curriculum. FY 1987-88.
ERIC Educational Resources Information Center
Tennessee Univ., Chattanooga. Center of Excellence for Computer Applications.
This report presents the results of a computer usage survey/inventory, the ninth in a series conducted at the University of Tennessee at Chattanooga to obtain information on the changing status of computer usage in the curricula. Data analyses are reported in 11 tables, which include comparisons between annual inventories and demonstrate growth…
1983-01-01
E STATE TOTAL 590 LEAR S b1 . . . . • I . i I I I . DEPARTMENT OF DEFENSE PAGE 381 PRIME CONTRACTS OVER $25. 000 BY FEDERAL STOCK CLASSIFICATION...MOTOR VEHICLE MAINTENANCE EQUIPMENT 94 RONAN & KUNZL INC MICHIGAN ARMY MOTOR VEHICLE MAINTENANCE EQUIPMENT C9 RUGBY INDUSTRIES INC MINNESOTA ARMY MOTOR
Summary document of tasks performed on the Shuttle-C/NLS contract
NASA Technical Reports Server (NTRS)
1993-01-01
During FY92, USBI performed many programmatic related tasks. These programmatic tasks have been categorized as follows: (1) acquisition; (2) project engineering/program planning; and (3) cost. The reports associated with these tasks follow in paragraphs 1.1.1 through 1.3.3. Proceeding each task report is a brief description of the contents contained within.
Office for Civil Rights Annual Report to Congress, Fiscal Year 2006
ERIC Educational Resources Information Center
US Department of Education, 2007
2007-01-01
In this report, the Office for Civil Rights (OCR) provides a summary of its substantive achievements in FY 2006. OCR's mission is to ensure equal access to education and to promote educational excellence throughout the nation through vigorous enforcement of civil rights. This report details OCR's accomplishments in enforcing the civil rights laws…
Annual Report to Congress of the Office for Civil Rights. Fiscal Year 2006
ERIC Educational Resources Information Center
Office for Civil Rights, US Department of Education, 2007
2007-01-01
This paper is the Office for Civil Rights' (OCR's) "Annual Report to Congress" for fiscal year 2006. In this report, OCR provides a summary of its substantive achievements in FY 2006. OCR's mission is to ensure equal access to education and to promote educational excellence throughout the nation through vigorous enforcement of civil…
Illinois Prekindergarten Program for Children At Risk of Academic Failure. FY 93 Summary Report.
ERIC Educational Resources Information Center
Illinois State Board of Education, Springfield, Dept. of Planning, Research and Evaluation.
The Illinois Prekindergarten Program for Children at Risk of Academic Failure was a grant program for public school districts to enhance growth and development of children ages 3 to 5 who are at risk of academic failure. The program has experienced significant growth since its initial implementation, and the number of participating projects…
77 FR 23277 - Wekiva River System Advisory Management Committee Meetings (FY2012)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-18
...: Notice of upcoming scheduled meetings. SUMMARY: This notice announces a schedule of upcoming meetings for... 5, 2012 (Recreation Hall). Time: All scheduled meetings will begin at 3 p.m. and will end by 5 p.m... public. Each scheduled meeting will result in decisions and steps that advance the Wekiva River System...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
... (NIST), Department of Commerce. ACTION: Request for information. SUMMARY: On July 22, 2011, NIST... Manufacturing Technology Consortia (AMTech) Program, which was proposed in the NIST fiscal year (FY) 2012 budget. NIST is publishing this notice to extend the deadline for the submission of comments pertaining to the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weber, M. C.; Nichols, W. E.; Lehman, L. L.
In accordance with U.S. Department of Energy (DOE) requirements in DOE M 435.1 Chg. 1, and as implemented by DOE/RL-2009-29, the DOE Richland Operations Office has prepared this annual summary of the Hanford Site Composite Analysis for fiscal year 2017.
FY 1991 RDT&E Descriptive Summaries
1990-01-01
OF PROJECT : The Defense Sciences program element provides the technical foundation for long-term improvements in military equiment...DESCRIPTION OF PROJECT : Develop the fundamental technology in advanced digital structures and network concepts for smaller, more powerful, less expensive...DESCRIPTION OF PROJECT : The 1985 Defense Science Board (DSB) noted that the United States was behind and failing further behind in armor and
NASA Technical Reports Server (NTRS)
1980-01-01
A brief description of the Global Weather Experiment is presented. The world weather watch program plan is described and includes a global observing system, a global data processing system, a global telecommunication system, and a voluntary cooperation program. A summary of Federal Agency plans and programs to meet the challenges of international meteorology for the two year period, FY 1980-1981, is presented.
Research and technology, 1984: Marshall Space Flight Center
NASA Technical Reports Server (NTRS)
Moorehead, T. W. (Editor)
1984-01-01
The Marshall Space Flight Center conducts research programs in space sciences, materials processing in space, and atmospheric sciences, as well as technology programs in such areas as propulsion, materials, processes, and space power. This Marshall Space Flight Center 1984 Annual Report on Research and Technology contains summaries of the more significant scientific and technical results obtained during FY-84.
Straight A's: Public Education Policy and Progress. Volume 11, Number 8
ERIC Educational Resources Information Center
Amos, Jason, Ed.
2011-01-01
"Straight A's: Public Education Policy and Progress" is a biweekly newsletter that focuses on education news and events both in Washington, DC and around the country. The following articles are included in this issue: (1) Last Cut Is the Deepest: Final FY 2011 Spending Agreement Cuts Spending by Nearly $40 Billion, Includes More Cuts for Education…
Straight A's: Public Education Policy and Progress. Volume 11, Number 4
ERIC Educational Resources Information Center
Amos, Jason, Ed.
2011-01-01
"Straight A's: Public Education Policy and Progress" is a biweekly newsletter that focuses on education news and events both in Washington, DC and around the country. The following articles are included in this issue: (1) House Passes FY 2011 Spending Bill: Bill Cuts U.S. Department of Education Funding by $5 Billion; Title I, School…
Solar Thermal Power Systems parabolic dish project
NASA Technical Reports Server (NTRS)
Truscello, V. C.
1981-01-01
The status of the Solar Thermal Power Systems Project for FY 1980 is summarized. Included is: a discussion of the project's goals, program structure, and progress in parabolic dish technology. Analyses and test results of concentrators, receivers, and power converters are discussed. Progress toward the objectives of technology feasibility, technology readiness, system feasibility, and system readiness are covered.
Funding for U.S. biomedical research: the case for the scientist-advocate.
Nurse, J T D; Fox, C H
2012-07-01
The U.S. biomedical research community finds itself at a particularly consequential moment. Since the end of the Fiscal Year (FY) 1998-2003 NIH budget doubling period, brought to fruition with bipartisan leadership, the Federal investment in biomedical research has been declining. The NIH budget has actually decreased in constant dollars since FY 2004. Across-the-board cuts included in the Budget Control Act of 2011 would result in a loss of $2.4 billion and roughly 2,300 research project grants in FY 2013 alone, unless Congress acts to intervene before January 2013. Many of the beneficiaries of NIH support view advocacy for research funding as "someone else's job". The case to reverse this mindset must be made. Members of Congress and their staffers are open to consideration of the case for sustaining Federal investments in science, even during these difficult budget times. However, the advocacy effort must be broad-based and repeatedly presented to effect change. The figures on economic return from spending on biomedical research are compelling, but they do not tell the entire story. The results of biomedical research improve and save lives every single day, a fact that should not be lost on our elected leaders.
Chemistry and materials science progress report, FY 1994
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-01
Research is reported in the areas of surface science, fundamentals of the physics and processing of metals, energetic materials, transactinide materials and properties and other indirectly related areas of weapons research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
A Dynamic Model for Induced Reactivation of Latent Virus
2005-12-04
with human herpesvirus-6 in EBV -negative infectious mononucleosis , Journal of Medical Virology 71 (4), 569-577, 2003. [35] Wu FY, Ahn JH, Alcendor DJ...model that describes the reactivation of latent herpes virus by metabolic end products of anaerobic bacteria. Herpes viruses are double-stranded DNA ...cells that may be different from the types of cells targeted for primary infection. Latent virus persists in the cell nucleus as episomal DNA until it
FY2017 Energy Efficient Mobility Systems Annual Progress Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
During fiscal year 2017 (FY 2017), the U.S. Department of Energy (DOE) Vehicle Technologies Office (VTO) created the Energy Efficient Mobility Systems (EEMS) Program to understand the range of mobility futures that could result from these disruptive technologies and services, and to create solutions that improve mobility energy productivity, or the value derived from the transportation system per unit of energy consumed. Increases in mobility energy productivity result from improvements in the quality or output of the transportation system, and/or reductions in the energy used for transportation.
Building America Systems Integration Research Annual Report: FY 2012
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gestwick, M.
2013-05-01
This document is the Building America FY2012 Annual Report, which includes an overview of the Building America Program activities and the work completed by the National Renewable Energy Laboratory and the Building America industry consortia (the Building America teams). The annual report summarizes major technical accomplishments and progress towards U.S. Department of Energy Building Technologies Program's multi-year goal of developing the systems innovations that enable risk-free, cost effective, reliable and durable efficiency solutions that reduce energy use by 30%-50% in both new and existing homes.
Electric and Hybrid Vehicles Program. Sixteenth annual report to Congress for fiscal year 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-08-01
This report describes the progress achieved in developing electric and hybrid vehicle technologies, beginning with highlights of recent accomplishments in FY 1992. Detailed descriptions are provided of program activities during FY 1992 in the areas of battery, fuel cell, and propulsion system development, and testing and evaluation of new technology in fleet site operations and in laboratories. This Annual Report also contains a status report on incentives and use of foreign components, as well as a list of publications resulting from the DOE program.
Physics of the Cosmos Program Annual Technology Report
NASA Technical Reports Server (NTRS)
Pham, Bruce Thai; Cardiff, Ann H.
2015-01-01
What's in this Report? What's New? This fifth Program Annual Technology Report (PATR) summarizes the Programs technology development activities for fiscal year (FY) 2015. The PATR serves four purposes.1. Summarize the technology gaps identified by the astrophysics community;2. Present the results of this years technology gap prioritization by the PCOS Technology Management Board (TMB);3. Report on newly funded PCOS Strategic Astrophysics Technology (SAT) projects; and4. Detail progress, current status, and activities planned for the coming year for all technologies supported by PCOS Supporting Research and Technology (SRT) funding in FY 2015. .
Human genome. 1993 Program report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
The purpose of this report is to update the Human Genome 1991-92 Program Report and provide new information on the DOE genome program to researchers, program managers, other government agencies, and the interested public. This FY 1993 supplement includes abstracts of 60 new or renewed projects and listings of 112 continuing and 28 completed projects. These two reports, taken together, present the most complete published view of the DOE Human Genome Program through FY 1993. Research is progressing rapidly toward 15-year goals of mapping and sequencing the DNA of each of the 24 different human chromosomes.
Notification: Evaluate EPA’s Progress Under Plan EJ 2014
Project #OPE-FY14-0040, June 9, 2014. The U.S. Environmental Protection Agency's (EPA's) Office of Inspector General (OIG) is starting preliminary research on the EPA's oversight of environmental justice activities.
Benchmarking of OEM Hybrid Electric Vehicles at NREL: Milestone Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, K. J.; Rajagopalan, A.
2001-10-26
A milestone report that describes the NREL's progress and activities related to the DOE FY2001 Annual Operating Plan milestone entitled ''Benchmark 2 new production or pre-production hybrids with ADVISOR.''