Science.gov

Sample records for gas-recirculation system planned

  1. Combustion-gas recirculation system

    DOEpatents

    Baldwin, Darryl Dean

    2007-10-09

    A combustion-gas recirculation system has a mixing chamber with a mixing-chamber inlet and a mixing-chamber outlet. The combustion-gas recirculation system may further include a duct connected to the mixing-chamber inlet. Additionally, the combustion-gas recirculation system may include an open inlet channel with a solid outer wall. The open inlet channel may extend into the mixing chamber such that an end of the open inlet channel is disposed between the mixing-chamber inlet and the mixing-chamber outlet. Furthermore, air within the open inlet channel may be at a pressure near or below atmospheric pressure.

  2. Exhaust gas recirculation system for an internal combustion engine

    SciTech Connect

    Wu, Ko-Jen

    2013-05-21

    An exhaust gas recirculation system for an internal combustion engine comprises an exhaust driven turbocharger having a low pressure turbine outlet in fluid communication with an exhaust gas conduit. The turbocharger also includes a low pressure compressor intake and a high pressure compressor outlet in communication with an intake air conduit. An exhaust gas recirculation conduit fluidly communicates with the exhaust gas conduit to divert a portion of exhaust gas to a low pressure exhaust gas recirculation branch extending between the exhaust gas recirculation conduit and an engine intake system for delivery of exhaust gas thereto. A high pressure exhaust gas recirculation branch extends between the exhaust gas recirculation conduit and the compressor intake and delivers exhaust gas to the compressor for mixing with a compressed intake charge for delivery to the intake system.

  3. Engine with exhaust gas recirculation system and variable geometry turbocharger

    DOEpatents

    Keating, Edward J.

    2015-11-03

    An engine assembly includes an intake assembly, an internal combustion engine defining a plurality of cylinders and configured to combust a fuel and produce exhaust gas, and an exhaust assembly in fluid communication with a first subset of the plurality of cylinders. Each of the plurality of cylinders are provided in fluid communication with the intake assembly. The exhaust assembly is provided in fluid communication with a first subset of the plurality of cylinders, and a dedicated exhaust gas recirculation system in fluid communication with both a second subset of the plurality of cylinders and with the intake assembly. The dedicated exhaust gas recirculation system is configured to route all of the exhaust gas from the second subset of the plurality of cylinders to the intake assembly. Finally, the engine assembly includes a turbocharger having a variable geometry turbine in fluid communication with the exhaust assembly.

  4. Design validation and performance of closed loop gas recirculation system

    NASA Astrophysics Data System (ADS)

    Kalmani, S. D.; Joshi, A. V.; Majumder, G.; Mondal, N. K.; Shinde, R. R.

    2016-11-01

    A pilot experimental set up of the India Based Neutrino Observatory's ICAL detector has been operational for the last 4 years at TIFR, Mumbai. Twelve glass RPC detectors of size 2 × 2 m2, with a gas gap of 2 mm are under test in a closed loop gas recirculation system. These RPCs are continuously purged individually, with a gas mixture of R134a (C2H2F4), isobutane (iC4H10) and sulphur hexafluoride (SF6) at a steady rate of 360 ml/h to maintain about one volume change a day. To economize gas mixture consumption and to reduce the effluents from being released into the atmosphere, a closed loop system has been designed, fabricated and installed at TIFR. The pressure and flow rate in the loop is controlled by mass flow controllers and pressure transmitters. The performance and integrity of RPCs in the pilot experimental set up is being monitored to assess the effect of periodic fluctuation and transients in atmospheric pressure and temperature, room pressure variation, flow pulsations, uniformity of gas distribution and power failures. The capability of closed loop gas recirculation system to respond to these changes is also studied. The conclusions from the above experiment are presented. The validations of the first design considerations and subsequent modifications have provided improved guidelines for the future design of the engineering module gas system.

  5. TRACG Simulation of Drywell Gas Recirculation System in ESBWR

    SciTech Connect

    Cheung, Yee K.; Rao, Atambir S.

    2002-07-01

    This paper presents the results of a parametric study on the mitigating effects of the Drywell Gas Recirculation System (DGRS) in ESBWR during postulated LOCA and severe accidents. The post-accident containment pressure depends on the sum of the partial pressure from non-condensable gases and partial steam pressure inside the wet-well airspace. Results of parametric studies show that, with the activation of DGRS: (1) The containment pressure continues to reduce due to the redistribution of non-condensable gases from the wet-well back to the drywell; (2) The DGRS can be designed in a 'portable' fashion; (3) The Current ESBWR meets the design requirement with significant margin using only passive safety systems, and the margin increases considerably with the activation of DGRS. (authors)

  6. Integrated exhaust gas recirculation and charge cooling system

    SciTech Connect

    Wu, Ko-Jen

    2013-12-10

    An intake system for an internal combustion engine comprises an exhaust driven turbocharger configured to deliver compressed intake charge, comprising exhaust gas from the exhaust system and ambient air, through an intake charge conduit and to cylinders of the internal combustion engine. An intake charge cooler is in fluid communication with the intake charge conduit. A cooling system, independent of the cooling system for the internal combustion engine, is in fluid communication with the intake charge cooler through a cooling system conduit. A coolant pump delivers a low temperature cooling medium from the cooling system to and through the intake charge cooler for the transfer of heat from the compressed intake charge thereto. A low temperature cooler receives the heated cooling medium through the cooling system conduit for the transfer or heat therefrom.

  7. Anode gas recirculation for improving the performance and cost of a 5-kW solid oxide fuel cell system

    NASA Astrophysics Data System (ADS)

    Torii, Ryohei; Tachikawa, Yuya; Sasaki, Kazunari; Ito, Kohei

    2016-09-01

    Solid oxide fuel cells (SOFCs) have the potential to efficiently convert chemical energy into electricity and heat and are expected to be implemented in stationary combined heat and power (CHP) systems. This paper presents the heat balance analysis for a 5-kW medium-sized integrated SOFC system and the evaluation of the effect of anode gas recirculation on the system performance. The risk of carbon deposition on an SOFC anode due to anode gas recirculation is also assessed using the C-H-O diagram obtained from thermodynamic equilibrium calculations. These results suggest that a higher recirculation ratio increases net fuel utilization and improves the electrical efficiency of the SOFC system. Furthermore, cost simulation of the SOFC system and comparison with the cost of electricity supply by a power grid indicates that the capital cost is sufficiently low to popularize the SOFC system in terms of the total cost over one decade.

  8. Anoxic gas recirculation system for fouling control in anoxic membrane reactor.

    PubMed

    Lee, Hansaem; Lee, Daeju; Hong, Seongwan; Yun, Geum Hee; Kim, Sungpyo; Hwang, Jung Ki; Lee, Woojae; Yun, Zuwhan

    2014-06-01

    Anoxic gas recirculation system was applied to control the membrane fouling in pilot-scale 4-stage anoxic membrane bioreactor (MBR). In the anaerobic-anoxic-anoxic-aerobic flow scheme, hydrophilic polytetrafluoroethylene (PTFE) membrane (0.2 μm, 7.2 m(2)/module) was submerged in the second anoxic zone. During 8 months operation, the average flux of the membrane was 21.3 L/(m(2)·hr). Chemical cleaning of the membrane was conducted only once with sodium hydroxide and sodium hypochlorite. Dissolved oxygen (DO) concentration in the second anoxic zone was maintained with an average of 0.19 ± 0.05 mg/L. Gas chromatography analysis showed that the headspace gas in the second anoxic reactor was mainly consisted of N2 (93.0% ± 2.5%), O2 (3.8% ± 0.6%), and CO2 (3.0% ± 0.5%), where the saturation DO concentration in liquid phase was 1.57 mg/L. Atmospheric O2 content (20.5% ± 0.8%) was significantly reduced in the anoxic gas. The average pH in the reactor was 7.2 ± 0.4. As a result, the recirculation of the anoxic gas was successfully applied to control the membrane fouling in the anoxic MBR. Copyright © 2014 The Research Centre for Eco-Environmental Sciences, Chinese Academy of Sciences. Published by Elsevier B.V. All rights reserved.

  9. Efficiency analysis of a hydrogen-fueled solid oxide fuel cell system with anode off-gas recirculation

    NASA Astrophysics Data System (ADS)

    Peters, Roland; Deja, Robert; Engelbracht, Maximilian; Frank, Matthias; Nguyen, Van Nhu; Blum, Ludger; Stolten, Detlef

    2016-10-01

    This study analyzes different hydrogen-fueled solid oxide fuel cell (SOFC) system layouts. It begins with a simple system layout without any anode off-gas recirculation, continues with a configuration equipped with off-gas recirculation, including steam condensation and then considers a layout with a dead-end anode off-gas loop. Operational parameters such as stack fuel utilization, as well as the recirculation rate, are modified, with the aim of achieving the highest efficiency values. Drawing on experiments and the accumulated experience of the SOFC group at the Forschungszentrum Jülich, a set of operational parameters were defined and applied to the simulations. It was found that anode off-gas recirculation, including steam condensation, improves electrical efficiency by up to 11.9 percentage-points compared to a layout without recirculation of the same stack fuel utilization. A system layout with a dead-end anode off-gas loop was also found to be capable of reaching electrical efficiencies of more than 61%.

  10. Demonstration of a Highly Efficient Solid Oxide Fuel Cell Power System Using Adiabatic Steam Reforming and Anode Gas Recirculation

    SciTech Connect

    Powell, Michael R.; Meinhardt, Kerry D.; Sprenkle, Vincent L.; Chick, Lawrence A.; Mcvay, Gary L.

    2012-05-01

    Solid oxide fuel cells (SOFC) are currently being developed for a wide variety of applications because of their high efficiency at multiple power levels. Applications for SOFCs encompass a large range of power levels including 1-2 kW residential combined heat and power applications, 100-250 kW sized systems for distributed generation and grid extension, and MW-scale power plants utilizing coal. This paper reports on the development of a highly efficient, small-scale SOFC power system operating on methane. The system uses adiabatic steam reforming of methane and anode gas recirculation to achieve high net electrical efficiency. The anode exit gas is recirculated and all of the heat and water required for the endothermic reforming reaction are provided by the anode gas emerging from the SOFC stack. Although the single-pass fuel utilization is only about 55%, because of the anode gas recirculation the overall fuel utilization is up to 93%. The demonstrated system achieved gross power output of 1650 to 2150 watts with a maximum net LHV efficiency of 56.7% at 1720 watts. Overall system efficiency could be further improved to over 60% with use of properly sized blowers.

  11. Performance of the prototype gas recirculation system with built-in RGA for INO RPC system

    NASA Astrophysics Data System (ADS)

    Bhuyan, M.; Datar, V. M.; Joshi, A.; Kalmani, S. D.; Mondal, N. K.; Rahman, M. A.; Satyanarayana, B.; Verma, P.

    2012-01-01

    An open loop gas recovery and recirculation system has been developed for the INO RPC system. The gas mixture coming from RPC exhaust is first desiccated by passing through molecular sieve (3 Å+4 Å). Subsequent scrubbing over basic active alumina removes toxic and acidic contaminants. The Isobutane and Freon are then separated by diffusion and liquefied by fractional condensation by cooling up to -26C. A Residual Gas Analyser (RGA) is being used in the loop to study the performance of the recirculation system. The results of the RGA analysis will be discussed.

  12. Power plant including an exhaust gas recirculation system for injecting recirculated exhaust gases in the fuel and compressed air of a gas turbine engine

    DOEpatents

    Anand, Ashok Kumar; Nagarjuna Reddy, Thirumala Reddy; Shaffer, Jason Brian; York, William David

    2014-05-13

    A power plant is provided and includes a gas turbine engine having a combustor in which compressed gas and fuel are mixed and combusted, first and second supply lines respectively coupled to the combustor and respectively configured to supply the compressed gas and the fuel to the combustor and an exhaust gas recirculation (EGR) system to re-circulate exhaust gas produced by the gas turbine engine toward the combustor. The EGR system is coupled to the first and second supply lines and configured to combine first and second portions of the re-circulated exhaust gas with the compressed gas and the fuel at the first and second supply lines, respectively.

  13. Engine with pulse-suppressed dedicated exhaust gas recirculation

    DOEpatents

    Keating, Edward J.; Baker, Rodney E.

    2016-06-07

    An engine assembly includes an intake assembly, a spark-ignited internal combustion engine, and an exhaust assembly. The intake assembly includes a charge air cooler disposed between an exhaust gas recirculation (EGR) mixer and a backpressure valve. The charge air cooler has both an inlet and an outlet, and the back pressure valve is configured to maintain a minimum pressure difference between the inlet of the charge air cooler and an outlet of the backpressure valve. A dedicated exhaust gas recirculation system is provided in fluid communication with at least one cylinder and with the EGR mixer. The dedicated exhaust gas recirculation system is configured to route all of the exhaust gas from the at least one cylinder to the EGR mixer for recirculation back to the engine.

  14. High speed exhaust gas recirculation valve

    SciTech Connect

    Fensom, Rod; Kidder, David J.

    2005-01-18

    In order to minimize pollutants such as Nox, internal combustion engines typically include an exhaust gas recirculation (EGR) valve that can be used to redirect a portion of exhaust gases to an intake conduit, such as an intake manifold, so that the redirected exhaust gases will be recycled. It is desirable to have an EGR valve with fast-acting capabilities, and it is also desirable to have the EGR valve take up as little space as possible. An exhaust gas recirculation valve is provided that includes an exhaust passage tube, a valve element pivotally mounted within the exhaust passage tube, a linear actuator; and a gear train. The gear train includes a rack gear operatively connected to the linear actuator, and at least one rotatable gear meshing with the rack gear and operatively connected to the valve element to cause rotation of the valve element upon actuation of the linear actuator. The apparatus provides a highly compact package having a high-speed valve actuation capability.

  15. 40 CFR 1065.127 - Exhaust gas recirculation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Exhaust gas recirculation. 1065.127 Section 1065.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Equipment Specifications § 1065.127 Exhaust gas recirculation. Use...

  16. 40 CFR 1065.127 - Exhaust gas recirculation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Exhaust gas recirculation. 1065.127 Section 1065.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Equipment Specifications § 1065.127 Exhaust gas recirculation. Use...

  17. 40 CFR 1065.127 - Exhaust gas recirculation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Exhaust gas recirculation. 1065.127 Section 1065.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Equipment Specifications § 1065.127 Exhaust gas recirculation. Use...

  18. 40 CFR 1065.127 - Exhaust gas recirculation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Exhaust gas recirculation. 1065.127 Section 1065.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Equipment Specifications § 1065.127 Exhaust gas recirculation. Use...

  19. 40 CFR 1065.127 - Exhaust gas recirculation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Exhaust gas recirculation. 1065.127 Section 1065.127 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS ENGINE-TESTING PROCEDURES Equipment Specifications § 1065.127 Exhaust gas recirculation. Use...

  20. Exhaust gas recirculation method for internal combustion engines

    SciTech Connect

    Kawanabe, T.; Kimura, K.; Asakura, M.; Shiina, T.

    1988-07-19

    This patent describes a method of controlling exhaust gas recirculation in an internal combustion engine having an exhaust passage, an intake passage, an exhaust gas recirculating passage communicating the exhaust passage with the intake passage, and exhaust gas recirculating valve; and a transmission having a shift lever. The valve opening of the exhaust gas recirculating valve is controlled in response to operating conditions of the engine so as to regulate the amount of exhaust gas recirculation to values appropriate to the operating conditions of the engine. The method comprising the steps of (1) determining whether or not the engine is in at least one of a predetermined accelerating condition and a predetermined decelerating condition; (2) varying the valve opening of the exhaust gas recirculating valve by a predetermined value when the engine is determined to be in at least one of the predetermined accelerating condition and the predetermined decelerating condition; (3) detecting a position of the shift lever of the transmission; and (4) correcting the predetermined value in accordance with the detected position of the shift lever so as to increase the valve opening of the exhaust gas recirculating valve as the shift lever of the transmission is set to a higher speed position.

  1. The trapping system for the recirculated gases at different locations of the exhaust gas recirculation (EGR) pipe of a homogeneous charge compression ignition (HCCI) engine

    NASA Astrophysics Data System (ADS)

    Piperel, A.; Montagne, X.; Dagaut, P.

    2008-10-01

    Nowadays, in diesel engines, it is typical to recycle exhaust gases (EGR) in order to decrease pollutant emissions. However, few studies report the precisely measured composition of the recycled gases. Indeed, in order to know precisely the composition of the EGR gases, they have to be sampled hot and not diluted, in contrast to the usual practice. Thus, a new system to collect such samples was developed. With this new trapping system, it is possible to measure the concentrations of NOx, CO, CO2, O2, hydrocarbons (HCs) in the range C1-C9, aldehydes, ketones and PAHs. The trapping system and the analytical protocol used are described in this paper.

  2. The design, fabrication, operation and maintenance of D0 prototype 1/2 H. P. 170 S. C. F. H. gas recirculating-filtration-blending system

    SciTech Connect

    Sellberg, G.; Rapp, P.

    1991-10-01

    Fermi National Accelerator Laboratory (Fermilab) D{null} collider, E-740, uses 150 proportional drift tube (P.D.T.) modules connected to a common multiple header to supply clean low pressure gas. A second multiple header returns the gas to the mixing area and exhausts it to the atmosphere. To test and debug the major construction problems associated with a large and long term experiment, a small cosmic ray test stand was constructed in the Wilson Hall ground floor Physics area. The first four P.D.T.'s that were constructed at FNAL's lab 5 Assembly area were installed in an 110 ton cosmic ray test stand. Two P.D.T.'s were installed above the double 50 ton magnet toroids and two were installed below. A prototype gas system was fabricated for the purpose of conducting development of a recirculating, filtering, and blending system for gas components as called upon by daily requirements set by the current needs of a collider experiment.

  3. Exhaust gas recirculation in a homogeneous charge compression ignition engine

    DOEpatents

    Duffy, Kevin P [Metamora, IL; Kieser, Andrew J [Morton, IL; Rodman, Anthony [Chillicothe, IL; Liechty, Michael P [Chillicothe, IL; Hergart, Carl-Anders [Peoria, IL; Hardy, William L [Peoria, IL

    2008-05-27

    A homogeneous charge compression ignition engine operates by injecting liquid fuel directly in a combustion chamber, and mixing the fuel with recirculated exhaust and fresh air through an auto ignition condition of the fuel. The engine includes at least one turbocharger for extracting energy from the engine exhaust and using that energy to boost intake pressure of recirculated exhaust gas and fresh air. Elevated proportions of exhaust gas recirculated to the engine are attained by throttling the fresh air inlet supply. These elevated exhaust gas recirculation rates allow the HCCI engine to be operated at higher speeds and loads rendering the HCCI engine a more viable alternative to a conventional diesel engine.

  4. Environmental performance of air staged combustor with flue gas recirculation to burn coal/biomass

    SciTech Connect

    Anuar, S.H.; Keener, H.M.

    1995-12-31

    The environmental and thermal performance of a 1.07 m diameter, 440 kW atmospheric fluidized bed combustor operated at 700{degrees}C-920{degrees}C and burning coal was studied. Flue gas recirculation was incorporated to enhance the thermal performance and air staging was used to control emissions of SO{sub 2}, CO, NO{sub x} and N{sub 2}O. Studies focused on the effect of excess air, firing rate, and use of sorbent on system performance. The recirculation-staging mode with limestone had the highest thermal efficiency (0.67) using the firing equation. Emission data showed that flue gas recirculation (ratio of 0.7) significantly reduced NO{sub x} emissions; and that use of limestone sorbent at a Ca/S ratio of 3 reduced SO{sub 2} emissions by 64% to approximately 0.310 g/MJ.

  5. Effect of flue gas recirculation on heat transfer in a supercritical circulating fluidized bed combustor

    NASA Astrophysics Data System (ADS)

    Błaszczuk, Artur

    2015-09-01

    This paper focuses on assessment of the effect of flue gas recirculation (FGR) on heat transfer behavior in 1296t/h supercritical coal-fired circulating fluidized bed (CFB) combustor. The performance test in supercritical CFB combustor with capacity 966 MWth was performed with the low level of flue gas recirculation rate 6.9% into furnace chamber, for 80% unit load at the bed pressure of 7.7 kPa and the ratio of secondary air to the primary air SA/PA = 0.33. Heat transfer behavior in a supercritical CFB furnace between the active heat transfer surfaces (membrane wall and superheater) and bed material has been analyzed for Geldart B particle with Sauter mean diameters of 0.219 and 0.246 mm. Bed material used in the heat transfer experiments had particle density of 2700 kg/m3. A mechanistic heat transfer model based on cluster renewal approach was used in this work. A heat transfer analysis of CFB combustion system with detailed consideration of bed-to-wall heat transfer coefficient distributions along furnace height is investigated. Heat transfer data for FGR test were compared with the data obtained for representative conditions without recycled flue gases back to the furnace through star-up burners.

  6. Use of exhaust gas recirculation as a control approach for thermoacoustic instabilities

    SciTech Connect

    Ranalli, J.; Ferguson, D.

    2011-10-09

    Investigation into exhaust gas recirculation (EGR) as a method for reducing costs of postcombustion carbon capture in gas turbine systems reveals that EGR offers potential applications as a control strategy for thermoacoustic instabilities. Introduction of EGR allows semi-independent variation of the operating parameter of flame temperature and characteristic flame length scales, known to play a primary role in the phase of the thermoacoustic coupling mechanism. Measurements were made showing the ability of EGR to reduce the amplitude of thermoacoustic oscillations over a range of operating conditions in a laboratory scale, swirled dump combustor, without affecting the flame temperature. Theoretical analysis was also performed to investigate the limitations on the ability of this approach to influence dynamics.

  7. Reaction behavior of SO2 in the sintering process with flue gas recirculation.

    PubMed

    Yu, Zhi-Yuan; Fan, Xiao-Hui; Gan, Min; Chen, Xu-Ling; Chen, Qiang; Huang, Yun-Song

    2016-07-01

    The primary goal of this paper is to reveal the reaction behavior of SO2 in the sinter zone, combustion zone, drying-preheating zone, and over-wet zone during flue gas recirculation (FGR) technique. The results showed that SO2 retention in the sinter zone was associated with free-CaO in the form of CaSO3/CaSO4, and the SO2 adsorption reached a maximum under 900ºC. SO2 in the flue gas came almost from the combustion zone. One reaction behavior was the oxidation of sulfur in the sintering mix when the temperature was between 800 and 1000ºC; the other behavior was the decomposition of sulfite/sulfate when the temperature was over 1000ºC. However, the SO2 adsorption in the sintering bed mainly occurred in the drying-preheating zone, adsorbed by CaCO3, Ca(OH)2, and CaO. When the SO2 adsorption reaction in the drying-preheating zone reached equilibrium, the excess SO2 gas continued to migrate to the over-wet zone and was then absorbed by Ca(OH)2 and H2O. The emission rising point of SO2 moved forward in combustion zone, and the concentration of SO2 emissions significantly increased in the case of flue gas recirculation (FGR) technique. Aiming for the reuse of the sensible heat and a reduction in exhaust gas emission, the FGR technique is proposed in the iron ore sintering process. When using the FGR technique, SO2 emission in exhaust gas gets changed. In practice, the application of the FGR technique in a sinter plant should be cooperative with the flue gas desulfurization (FGD) technique. Thus, it is necessary to study the influence of the FGR technique on SO2 emissions because it will directly influence the demand and design of the FGD system.

  8. An Approach to the Prototyping of an Optimized Limited Stroke Actuator to Drive a Low Pressure Exhaust Gas Recirculation Valve

    PubMed Central

    Gutfrind, Christophe; Dufour, Laurent; Liebart, Vincent; Vannier, Jean-Claude; Vidal, Pierre

    2016-01-01

    The purpose of this article is to describe the design of a limited stroke actuator and the corresponding prototype to drive a Low Pressure (LP) Exhaust Gas Recirculation (EGR) valve for use in Internal Combustion Engines (ICEs). The direct drive actuator topology is an axial flux machine with two air gaps in order to minimize the rotor inertia and a bipolar surface-mounted permanent magnet in order to respect an 80° angular stroke. Firstly, the actuator will be described and optimized under constraints of a 150 ms time response, a 0.363 N·m minimal torque on an angular range from 0° to 80° and prototyping constraints. Secondly, the finite element method (FEM) using the FLUX-3D® software (CEDRAT, Meylan, France) will be used to check the actuator performances with consideration of the nonlinear effect of the iron material. Thirdly, a prototype will be made and characterized to compare its measurement results with the analytical model and the FEM model results. With these electromechanical behavior measurements, a numerical model is created with Simulink® in order to simulate an EGR system with this direct drive actuator under all operating conditions. Last but not least, the energy consumption of this machine will be estimated to evaluate the efficiency of the proposed EGR electromechanical system. PMID:27213398

  9. An Approach to the Prototyping of an Optimized Limited Stroke Actuator to Drive a Low Pressure Exhaust Gas Recirculation Valve.

    PubMed

    Gutfrind, Christophe; Dufour, Laurent; Liebart, Vincent; Vannier, Jean-Claude; Vidal, Pierre

    2016-05-20

    The purpose of this article is to describe the design of a limited stroke actuator and the corresponding prototype to drive a Low Pressure (LP) Exhaust Gas Recirculation (EGR) valve for use in Internal Combustion Engines (ICEs). The direct drive actuator topology is an axial flux machine with two air gaps in order to minimize the rotor inertia and a bipolar surface-mounted permanent magnet in order to respect an 80° angular stroke. Firstly, the actuator will be described and optimized under constraints of a 150 ms time response, a 0.363 N·m minimal torque on an angular range from 0° to 80° and prototyping constraints. Secondly, the finite element method (FEM) using the FLUX-3D(®) software (CEDRAT, Meylan, France) will be used to check the actuator performances with consideration of the nonlinear effect of the iron material. Thirdly, a prototype will be made and characterized to compare its measurement results with the analytical model and the FEM model results. With these electromechanical behavior measurements, a numerical model is created with Simulink(®) in order to simulate an EGR system with this direct drive actuator under all operating conditions. Last but not least, the energy consumption of this machine will be estimated to evaluate the efficiency of the proposed EGR electromechanical system.

  10. Impact of exhaust gas recirculation (EGR) on the oxidative reactivity of diesel engine soot

    SciTech Connect

    Al-Qurashi, Khalid; Boehman, Andre L.

    2008-12-15

    This paper expands the consideration of the factors affecting the nanostructure and oxidative reactivity of diesel soot to include the impact of exhaust gas recirculation (EGR). Past work showed that soot derived from oxygenated fuels such as biodiesel carries some surface oxygen functionality and thereby possesses higher reactivity than soot from conventional diesel fuel. In this work, results show that EGR exerts a strong influence on the physical properties of the soot which leads to enhanced oxidation rate. HRTEM images showed a dramatic difference between the burning modes of the soot generated under 0 and 20% EGR. The soot produced under 0% EGR strictly followed an external burning mode with no evidence of internal burning. In contrast, soot generated under 20% EGR exhibited dual burning modes: slow external burning and rapid internal burning. The results demonstrate clearly that highly reactive soot can be achieved by manipulating the physical properties of the soot via EGR. (author)

  11. The Use of Exhaust Gas Recirculation to Optimize Fuel Economy and Minimize Emission in Engines Operating on E85 Fuel

    SciTech Connect

    Wu, Ko-Jen

    2011-12-31

    This report summarizes activities conducted for the project “The Use of Exhaust Gas Recirculation to Optimized Fuel Economy and Minimize Emissions in Engines Operating on E85 Fuel” under COOPERATIVE AGREEMENT NUMBER DE-FC26-07NT43271, which are as outlined in the STATEMENT OF PROJECT OBJECTIVES (SOPO) dated March 2007 and in the supplemental SOPO dated October 2010. The project objective was to develop and demonstrate an internal combustion engine that is optimized for E85 (85% ethanol and 15% gasoline) fuel operation to achieve substantially improved fuel economy while operating with E85 fuel and that is also production viable in the near- to medium-term. The key engine technology selected for research and development was turbocharging, which is known to improve fuel economy thru downsizing and is in particular capable of exploiting ethanol fuel’s characteristics of high octane number and high latent heat of vaporization. The engine further integrated synergistic efficiency improving technologies of cooled exhaust gas recirculation (EGR), direct fuel injection and dual continuously variable intake and exhaust cam phasers. On the vehicle level, fuel economy was furthered thru powertrain system optimization by mating a state-of-the-art six-speed automatic transmission to the engine. In order to achieve the project’s objective of near- to medium-term production viability, it was essential to develop the engine to be flex-fuel capable of operating with fuels ranging from E0 (0% ethanol and 100% gasoline) to E85 and to use three-way type of catalyst technology for exhaust aftertreatment. Within these scopes, various technologies were developed through systems approach to focus on ways to help accelerate catalyst light-off. Significant amount of development took place during the course of the project within General Motors, LLC. Many prototype flex-fuel engines were designed, built and developed with various hardware configurations selected to achieve the project

  12. NO x Reduction in the Iron Ore Sintering Process with Flue Gas Recirculation

    NASA Astrophysics Data System (ADS)

    Yu, Zhiyuan; Fan, Xiaohui; Gan, Min; Chen, Xuling; Lv, Wei

    2017-02-01

    Flue gas recirculation (FGR) has been implemented for exhaust gas emissions reduction in iron ore sintering. However, the mechanism of NO x reduction through FGR is still unclear. In this paper, the laboratory pot-grate sintering test showed a 30% reduction in gas flow and 15.51% reduction in NO x emissions achieved with a 30% FGR ratio, and the sinter indexes almost matched those of the conventional process. In the sinter zone, NO-CO catalytic reduction occurs in the range of 500-900°C. When the sinter temperature is 700°C, the highest nitrogen reduction ratio (NRR) achieved is 8%; however, the NO x reduction is inhibited as the post-combustion of CO starts when the temperature increases beyond 700°C. NO x in the flue gas is mainly a product of the fuel combustion in the combustion zone, as the nitrogen conversion rate reaches 50-60%, because the N-containing intermediates exist during the fuel combustion. The existence of NO in the FGR gas inhibits the NO x generation from the fuel combustion, and the NO elimination—through the NO-carbon reaction—is significant in the combustion zone. The NRR in the combustion zone reaches a range of 18-20%.

  13. NO x Reduction in the Iron Ore Sintering Process with Flue Gas Recirculation

    NASA Astrophysics Data System (ADS)

    Yu, Zhiyuan; Fan, Xiaohui; Gan, Min; Chen, Xuling; Lv, Wei

    2017-09-01

    Flue gas recirculation (FGR) has been implemented for exhaust gas emissions reduction in iron ore sintering. However, the mechanism of NO x reduction through FGR is still unclear. In this paper, the laboratory pot-grate sintering test showed a 30% reduction in gas flow and 15.51% reduction in NO x emissions achieved with a 30% FGR ratio, and the sinter indexes almost matched those of the conventional process. In the sinter zone, NO-CO catalytic reduction occurs in the range of 500-900°C. When the sinter temperature is 700°C, the highest nitrogen reduction ratio (NRR) achieved is 8%; however, the NO x reduction is inhibited as the post-combustion of CO starts when the temperature increases beyond 700°C. NO x in the flue gas is mainly a product of the fuel combustion in the combustion zone, as the nitrogen conversion rate reaches 50-60%, because the N-containing intermediates exist during the fuel combustion. The existence of NO in the FGR gas inhibits the NO x generation from the fuel combustion, and the NO elimination—through the NO-carbon reaction—is significant in the combustion zone. The NRR in the combustion zone reaches a range of 18-20%.

  14. Next Generation Pressurized Oxy-Coal Combustion: High Efficiency and No Flue Gas Recirculation

    SciTech Connect

    Rue, David

    2013-09-30

    The Gas Technology Institute (GTI) has developed a pressurized oxy-coal fired molten bed boiler (MBB) concept, in which coal and oxygen are fired directly into a bed of molten coal slag through burners located on the bottom of the boiler and fired upward. Circulation of heat by the molten slag eliminates the need for a flue gas recirculation loop and provides excellent heat transfer to steam tubes in the boiler walls. Advantages of the MBB technology over other boilers include higher efficiency (from eliminating flue gas recirculation), a smaller and less expensive boiler, modular design leading to direct scalability, decreased fines carryover and handling costs, smaller exhaust duct size, and smaller emissions control equipment sizes. The objective of this project was to conduct techno-economic analyses and an engineering design of the MBB project and to support this work with thermodynamic analyses and oxy-coal burner testing. Techno-economic analyses of GTI’s pressurized oxy-coal fired MBB technology found that the overall plant with compressed CO2 has an efficiency of 31.6%. This is a significant increase over calculated 29.2% efficiency of first generation oxy-coal plants. Cost of electricity (COE) for the pressurized MBB supercritical steam power plant with CO2 capture and compression was calculated to be 134% of the COE for an air-coal supercritical steam power plant with no CO2 capture. This compares positively with a calculated COE for first generation oxy-coal supercritical steam power plants with CO2 capture and compression of 164%. The COE for the MBB power plant is found to meet the U.S. Department of Energy (DOE) target of 135%, before any plant optimization. The MBB power plant was also determined to be simpler than other oxy-coal power plants with a 17% lower capital cost. No other known combustion technology can produce higher efficiencies or lower COE when CO2 capture and compression are included. A thermodynamic enthalpy and exergy analysis

  15. Characteristics of three-phase internal loop airlift bioreactors with complete gas recirculation for non-Newtonian fluids.

    PubMed

    Wen, Jianping; Jia, Xiaoqiang; Cheng, Xianrui; Yang, Peng

    2005-05-01

    Hydrodynamic and gas-liquid mass transfer characteristics, such as liquid velocity, gas holdup, solid holdup and gas-liquid volumetric mass transfer coefficient, in the riser and downcomer of the gas-liquid-solid three-phase internal loop airlift bioreactors with complete gas recirculation for non-Newtonian fluids, were investigated. A mathematical model for the description of flow behavior and gas-liquid mass transfer of these bioreactors was developed. The predicted results of this model agreed well with the experimental data.

  16. High-Speed Multiplexed Spatiotemporally Resolved Measurements of Exhaust Gas Recirculation Dynamics in a Multi-Cylinder Engine Using Laser Absorption Spectroscopy.

    PubMed

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E; Perfetto, Anthony; Geckler, Sam; Partridge, William P

    2016-04-01

    The need for more environmentally friendly and efficient energy conversion is of paramount importance in developing and designing next-generation internal combustion (IC) engines for transportation applications. One effective solution to reducing emissions of mono-nitrogen oxides (NOx) is exhaust gas recirculation (EGR), which has been widely implemented in modern vehicles. However, cylinder-to-cylinder and cycle-to-cycle variations in the charge-gas uniformity can be a major barrier to optimum EGR implementation on multi-cylinder engines, and can limit performance, stability, and efficiency. Precise knowledge and fine control over the EGR system is therefore crucial, particularly for optimizing advanced engine concepts such as reactivity controlled compression ignition (RCCI). An absorption-based laser diagnostic was developed to study spatiotemporal charge-gas distributions in an IC engine intake manifold in real-time. The laser was tuned to an absorption band of carbon dioxide (CO2), a standard exhaust-gas marker, near 2.7 µm. The sensor was capable of probing four separate measurement locations simultaneously, and independently analyzing EGR fraction at speeds of 5 kHz (1.2 crank-angle degree (CAD) at 1 k RPM) or faster with high accuracy. The probes were used to study spatiotemporal EGR non-uniformities in the intake manifold and ultimately promote the development of more efficient and higher performance engines.

  17. High-Speed Multiplexed Spatiotemporally Resolved Measurements of Exhaust Gas Recirculation Dynamics in a Multi-Cylinder Engine Using Laser Absorption Spectroscopy

    DOE PAGES

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E.; ...

    2016-04-01

    The need for more environmentally friendly and efficient energy conversion is of paramount importance in developing and designing next-generation internal combustion (IC) engines for transportation applications. One effective solution to reducing emissions of mono-nitrogen oxides (NOx) is exhaust gas recirculation (EGR), which has been widely implemented in modern vehicles. However, cylinder-to-cylinder and cycle-to-cycle variations in the charge-gas uniformity can be a major barrier to optimum EGR implementation on multi-cylinder engines, and can limit performance, stability, and efficiency. Precise knowledge and fine control over the EGR system is thus crucial, particularly for optimizing advanced engine concepts such as reactivity controlled compressionmore » ignition (RCCI). An absorption-based laser diagnostic was developed to study spatiotemporal charge-gas distributions in an IC engine intake manifold in real-time. The laser was tuned to an absorption band of carbon dioxide (CO2), a standard exhaust-gas marker, near 2.7 µm. The sensor was capable of probing four separate measurement locations simultaneously, and independently analyzing EGR fraction at speeds of 5 kHz (1.2 crank-angle degree (CAD) at 1 k RPM) or faster with high accuracy. Lastly, the probes were used to study spatiotemporal EGR non-uniformities in the intake manifold and ultimately promote the development of more efficient and higher performance engines.« less

  18. High-Speed Multiplexed Spatiotemporally Resolved Measurements of Exhaust Gas Recirculation Dynamics in a Multi-Cylinder Engine Using Laser Absorption Spectroscopy

    SciTech Connect

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E.; Perfetto, Anthony; Geckler, Sam; Partridge, William P.

    2016-04-01

    The need for more environmentally friendly and efficient energy conversion is of paramount importance in developing and designing next-generation internal combustion (IC) engines for transportation applications. One effective solution to reducing emissions of mono-nitrogen oxides (NOx) is exhaust gas recirculation (EGR), which has been widely implemented in modern vehicles. However, cylinder-to-cylinder and cycle-to-cycle variations in the charge-gas uniformity can be a major barrier to optimum EGR implementation on multi-cylinder engines, and can limit performance, stability, and efficiency. Precise knowledge and fine control over the EGR system is thus crucial, particularly for optimizing advanced engine concepts such as reactivity controlled compression ignition (RCCI). An absorption-based laser diagnostic was developed to study spatiotemporal charge-gas distributions in an IC engine intake manifold in real-time. The laser was tuned to an absorption band of carbon dioxide (CO2), a standard exhaust-gas marker, near 2.7 µm. The sensor was capable of probing four separate measurement locations simultaneously, and independently analyzing EGR fraction at speeds of 5 kHz (1.2 crank-angle degree (CAD) at 1 k RPM) or faster with high accuracy. Lastly, the probes were used to study spatiotemporal EGR non-uniformities in the intake manifold and ultimately promote the development of more efficient and higher performance engines.

  19. Review of homogeneous charge compression ignition (HCCI) combustion engines and exhaust gas recirculation (EGR) effects on HCCI

    NASA Astrophysics Data System (ADS)

    Akma Tuan Kamaruddin, Tengku Nordayana; Wahid, Mazlan Abdul; Sies, Mohsin Mohd

    2012-06-01

    This paper describes the development in ICE which leads to the new advanced combustion mode named Homogeneous Charge Compression Ignition (HCCI). It explains regarding the theory and working principle of HCCI plus the difference of the process in gasoline and diesel fuelled engines. Many of pioneer and recent research works are discussed to get the current state of art about HCCI. It gives a better indication on the potential of this method in improving the fuel efficiency and emission produced by the vehicles' engine. Apart from the advantages, the challenges and future trend of this technology are also included. HCCI is applying few types of control strategy in producing the optimum performance. This paper looks into Exhaust Gas Recirculation (EGR) as one of the control strategies.

  20. Fast Spatially Resolved Exhaust Gas Recirculation (EGR) Distribution Measurements in an Internal Combustion Engine Using Absorption Spectroscopy

    DOE PAGES

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E.; ...

    2015-09-01

    One effective method of reducing NOx emissions while improving efficiency is exhaust gas recirculation (EGR) in internal combustion engines. But, insufficient mixing between fresh air and exhaust gas can lead to cycle-to-cycle and cylinder-to-cylinder nonuniform charge gas mixtures of a multi-cylinder engine, which can in turn reduce engine performance and efficiency. Furthermore, a sensor packaged into a compact probe was designed, built and applied to measure spatiotemporal EGR distributions in the intake manifold of an operating engine. The probe promotes the development of more efficient and higher-performance engines by resolving high-speed in situ CO2 concentration at various locations in themore » intake manifold. Our study employed mid-infrared light sources tuned to an absorption band of CO2 near 4.3 μm, an industry standard species for determining EGR fraction. The calibrated probe was used to map spatial EGR distributions in an intake manifold with high accuracy and monitor cycle-resolved cylinder-specific EGR fluctuations at a rate of up to 1 kHz.« less

  1. Fast spatially resolved exhaust gas recirculation (EGR) distribution measurements in an internal combustion engine using absorption spectroscopy.

    PubMed

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E; Perfetto, Anthony; Geckler, Sam; Partridge, William P

    2015-09-01

    Exhaust gas recirculation (EGR) in internal combustion engines is an effective method of reducing NOx emissions while improving efficiency. However, insufficient mixing between fresh air and exhaust gas can lead to cycle-to-cycle and cylinder-to-cylinder non-uniform charge gas mixtures of a multi-cylinder engine, which can in turn reduce engine performance and efficiency. A sensor packaged into a compact probe was designed, built and applied to measure spatiotemporal EGR distributions in the intake manifold of an operating engine. The probe promotes the development of more efficient and higher-performance engines by resolving high-speed in situ CO2 concentration at various locations in the intake manifold. The study employed mid-infrared light sources tuned to an absorption band of CO2 near 4.3 μm, an industry standard species for determining EGR fraction. The calibrated probe was used to map spatial EGR distributions in an intake manifold with high accuracy and monitor cycle-resolved cylinder-specific EGR fluctuations at a rate of up to 1 kHz.

  2. Fast Spatially Resolved Exhaust Gas Recirculation (EGR) Distribution Measurements in an Internal Combustion Engine Using Absorption Spectroscopy

    SciTech Connect

    Yoo, Jihyung; Prikhodko, Vitaly; Parks, James E.; Perfetto, Anthony; Geckler, Sam; Partridge, William P.

    2015-09-01

    One effective method of reducing NOx emissions while improving efficiency is exhaust gas recirculation (EGR) in internal combustion engines. But, insufficient mixing between fresh air and exhaust gas can lead to cycle-to-cycle and cylinder-to-cylinder nonuniform charge gas mixtures of a multi-cylinder engine, which can in turn reduce engine performance and efficiency. Furthermore, a sensor packaged into a compact probe was designed, built and applied to measure spatiotemporal EGR distributions in the intake manifold of an operating engine. The probe promotes the development of more efficient and higher-performance engines by resolving high-speed in situ CO2 concentration at various locations in the intake manifold. Our study employed mid-infrared light sources tuned to an absorption band of CO2 near 4.3 μm, an industry standard species for determining EGR fraction. The calibrated probe was used to map spatial EGR distributions in an intake manifold with high accuracy and monitor cycle-resolved cylinder-specific EGR fluctuations at a rate of up to 1 kHz.

  3. Effect of exhaust gas recirculation on emissions from a flame-tube combustor using Liquid Jet A fuel

    NASA Technical Reports Server (NTRS)

    Marek, C. J.; Tacina, R. R.

    1976-01-01

    The effects of uncooled exhaust gas recirculation as an inert diluent on emissions of oxides of nitrogen (NO + NO2) and on combustion efficiency were investigated. Ratios of recirculated combustion products to inlet airflow were varied from 10 to 80 percent by using an inlet air ejector nozzle. Liquid Jet A fuel was used. The flame-tube combustor was 10.2 cm in diameter. It was operated with and without a flameholder present. The combustor pressure was maintained constant at 0.5 MPa. The equivalence ratio was varied from 0.3 to 1.0. The inlet air temperature was varied from 590 to 800 K, and the reference velocity from 10 to 30 m/sec. Increasing the percent recirculation from 10 to 25 had the following effects: (1) the peak NOx emission was decreased by 37 percent, from 8 to 5 g NO2/kg fuel, at an inlet air temperature of 590 K and a reference velocity of 15 m/sec; (2) the combustion efficiency was increased, particularly at the higher equivalence ratios; and (3) for a high combustion efficiency of greater than 99.5 percent, the range of operation of the combustor was nearly doubled in terms of equivalence ratio. Increasing the recirculation from 25 to 50 percent did not change the emissions significantly.

  4. Power system restoration planning

    SciTech Connect

    Adibi, M.M. ); Fink, L.H.

    1994-02-01

    System restoration, as an extraordinary mode of system operation, requires careful planning and operator training. The generic tasks of restoration include determination of system and equipment status, preparation of plants and network for systematic restoration, reenergization of the network, and system rebuilding. The procedures for developing an effective restoration plan include formation of a qualified planning team, review of relevant system characteristics, formulation of assumptions regarding blackout scenarios, agreement on restoration goals, development of strategy and tactics, validation of the plan, training, and documentation.

  5. Catalytic conversion of biomass-derived ethanol to liquid hydrocarbon blend-stock: Effect of light gas recirculation

    SciTech Connect

    Li, Zhenglong; Lepore, Andrew W.; Davison, Brian H.; Narula, Chaitanya K.

    2016-01-01

    Here, we describe a light gas recirculation (LGR) method to increase the liquid hydrocarbon yield with reduced aromatic content from catalytic conversion of ethanol to hydrocarbons. The previous liquid hydrocarbon yield is ~40% from one-pass ethanol conversion over V-ZSM-5 at 350 C and atmospheric pressure where the remaining ~60% yield is light gas hydrocarbons. In comparison, the liquid hydrocarbon yield increases to 80% when a simulated light gas hydrocarbon stream is co-fed at a rate of 0.053 mol g-1 h-1 with ethanol due to the conversion of most of the light olefins. The LGR also significantly improves the quality of the liquid hydrocarbon blend-stock by reducing aromatic content and overall benzene concentration. For 0.027 mol g-1 h-1 light gas mixture co-feeding, the average aromatic content in liquid hydrocarbons is 51.5% compared with 62.5% aromatic content in ethanol only experiment. Average benzene concentration decreases from 3.75% to 1.5% which is highly desirable since EPA limits benzene concentration in gasoline to 0.62%. As a result of low benzene concentration, the blend-wall for ethanol derived liquid hydrocarbons changes from ~18% to 43%. The remaining light paraffins and olefins can be further converted to valuable BTX products (94% BTX in the liquid) over Ga-ZSM-5 at 500 C. Thus, the LGR is an effective approach to convert ethanol to liquid hydrocarbons with higher liquid yield and low aromatic content, especially low benzene concentration, which could be blended with gasoline in a much higher ratio than ethanol or ethanol derived hydrocarbon blend-stock.

  6. Catalytic conversion of biomass-derived ethanol to liquid hydrocarbon blend-stock: Effect of light gas recirculation

    DOE PAGES

    Li, Zhenglong; Lepore, Andrew W.; Davison, Brian H.; ...

    2016-01-01

    Here, we describe a light gas recirculation (LGR) method to increase the liquid hydrocarbon yield with reduced aromatic content from catalytic conversion of ethanol to hydrocarbons. The previous liquid hydrocarbon yield is ~40% from one-pass ethanol conversion over V-ZSM-5 at 350 C and atmospheric pressure where the remaining ~60% yield is light gas hydrocarbons. In comparison, the liquid hydrocarbon yield increases to 80% when a simulated light gas hydrocarbon stream is co-fed at a rate of 0.053 mol g-1 h-1 with ethanol due to the conversion of most of the light olefins. The LGR also significantly improves the quality ofmore » the liquid hydrocarbon blend-stock by reducing aromatic content and overall benzene concentration. For 0.027 mol g-1 h-1 light gas mixture co-feeding, the average aromatic content in liquid hydrocarbons is 51.5% compared with 62.5% aromatic content in ethanol only experiment. Average benzene concentration decreases from 3.75% to 1.5% which is highly desirable since EPA limits benzene concentration in gasoline to 0.62%. As a result of low benzene concentration, the blend-wall for ethanol derived liquid hydrocarbons changes from ~18% to 43%. The remaining light paraffins and olefins can be further converted to valuable BTX products (94% BTX in the liquid) over Ga-ZSM-5 at 500 C. Thus, the LGR is an effective approach to convert ethanol to liquid hydrocarbons with higher liquid yield and low aromatic content, especially low benzene concentration, which could be blended with gasoline in a much higher ratio than ethanol or ethanol derived hydrocarbon blend-stock.« less

  7. Influence of increased exhaust gas recirculation ratio on the thermodynamic processes in CI DI engine

    NASA Astrophysics Data System (ADS)

    Pielecha, I.; Skowron, M.; Bueschke, W.; Cieślik, W.; Wisłocki, K.

    2016-09-01

    The aim of the conducted research was the thermodynamic identification of combustion process involving up to 50-60% recirculated exhaust gasses in compression ignition engine. The values of the respective indicators obtained for the high share of exhaust gasses in the cylinder were compared to the values obtained in the engine working without EGR. The research was conducted on the single-cylinder AVL 5804 engine equipped with recirculated gas cooling system. The conditions of combustion process were determined using indicators of engine operation and measurements of fast-varying cylinder pressure. The evaluation of the influence of different share of exhaust gases in the cylinder on the combustion course and heat release was conducted. As a result of the conducted research the possibility of utilizing the high share of exhaust gasses (50-60%) with simultaneous ecological benefits, not only in relation to nitrogen oxides, was demonstrated.

  8. Controlling exhaust gas recirculation

    DOEpatents

    Zurlo, James Richard [Madison, WI; Konkle, Kevin Paul [West Bend, WI; May, Andrew [Milwaukee, WI

    2012-01-31

    In controlling an engine, an amount of an intake charge provided, during operation of the engine, to a combustion chamber of the engine is determined. The intake charge includes an air component, a fuel component and a diluent component. An amount of the air component of the intake charge is determined. An amount of the diluent component of the intake charge is determined utilizing the amount of the intake charge, the amount of the air component and, in some instances, the amount of the fuel component. An amount of a diluent supplied to the intake charge is adjusted based at least in part on the determined amount of diluent component of the intake charge.

  9. Systems engineering management plans.

    SciTech Connect

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  10. Mission planning for autonomous systems

    NASA Technical Reports Server (NTRS)

    Pearson, G.

    1987-01-01

    Planning is a necessary task for intelligent, adaptive systems operating independently of human controllers. A mission planning system that performs task planning by decomposing a high-level mission objective into subtasks and synthesizing a plan for those tasks at varying levels of abstraction is discussed. Researchers use a blackboard architecture to partition the search space and direct the focus of attention of the planner. Using advanced planning techniques, they can control plan synthesis for the complex planning tasks involved in mission planning.

  11. Planning Systems for Distributed Operations

    NASA Technical Reports Server (NTRS)

    Maxwell, Theresa G.

    2002-01-01

    This viewgraph representation presents an overview of the mission planning process involving distributed operations (such as the International Space Station (ISS)) and the computer hardware and software systems needed to support such an effort. Topics considered include: evolution of distributed planning systems, ISS distributed planning, the Payload Planning System (PPS), future developments in distributed planning systems, Request Oriented Scheduling Engine (ROSE) and Next Generation distributed planning systems.

  12. Strategic Information Systems Planning.

    ERIC Educational Resources Information Center

    Rowley, Jennifer

    1995-01-01

    Strategic Information Systems Planning (SISP) is the process of establishing a program for implementation and use of information systems in ways that will optimize effectiveness of information resources and use them to support the objectives of the organization. Basic steps in SISP methodology are outlined. (JKP)

  13. OAST system technology planning

    NASA Technical Reports Server (NTRS)

    Sadin, S. R.

    1978-01-01

    The NASA Office of Aeronautics and Space Technology developed a planning model for space technology consisting of a space systems technology model, technology forecasts and technology surveys. The technology model describes candidate space missions through the year 2000 and identifies their technology requirements. The technology surveys and technology forecasts provide, respectively, data on the current status and estimates of the projected status of relevant technologies. These tools are used to further the understanding of the activities and resources required to ensure the timely development of technological capabilities. Technology forecasting in the areas of information systems, spacecraft systems, transportation systems, and power systems are discussed.

  14. Planning for Distributed Systems.

    ERIC Educational Resources Information Center

    Chew, Robert L.

    Reasons for distributed systems (DS) of planning and design for information services for colleges are discussed. The methodologies and approaches from industry and academe are contrasted to show how the process of DS can be effectively managed to meet a variety of institutional needs. DS represent a natural evolution of the historic development of…

  15. Planning for Distributed Systems.

    ERIC Educational Resources Information Center

    Chew, Robert L.

    Reasons for distributed systems (DS) of planning and design for information services for colleges are discussed. The methodologies and approaches from industry and academe are contrasted to show how the process of DS can be effectively managed to meet a variety of institutional needs. DS represent a natural evolution of the historic development of…

  16. Neurological surgery planning system

    NASA Astrophysics Data System (ADS)

    Jiang, Charlie Z. W.; Zamorano, Lucia J.; Kadi, A. Majeed

    1993-09-01

    The computer-assisted neurological surgery planning system (NSPS), developed by the Neurological Surgery Department, Wayne State University, Detroit, MI, is designed to offer neurosurgeons a safe and accurate method to approach intracranial lesions. Software consisting of the most advanced technologies in computer vision, computer graphics, and stereotactic numeric analysis forms the kernel of the system. Our paper discusses the functionalities and background theories used in NSPS.

  17. Mobile systems capability plan

    SciTech Connect

    1996-09-01

    This plan was prepared to initiate contracting for and deployment of these mobile system services. 102,000 cubic meters of retrievable, contact-handled TRU waste are stored at many sites around the country. Also, an estimated 38,000 cubic meters of TRU waste will be generated in the course of waste inventory workoff and continuing DOE operations. All the defense TRU waste is destined for disposal in WIPP near Carlsbad NM. To ship TRU waste there, sites must first certify that the waste meets WIPP waste acceptance criteria. The waste must be characterized, and if not acceptable, subjected to additional processing, including repackaging. Most sites plan to use existing fixed facilities or open new ones between FY1997-2006 to perform these functions; small-quantity sites lack this capability. An alternative to fixed facilities is the use of mobile systems mounted in trailers or skids, and transported to sites. Mobile systems will be used for all characterization and certification at small sites; large sites can also use them. The Carlsbad Area Office plans to pursue a strategy of privatization of mobile system services, since this offers a number of advantages. To indicate the possible magnitude of the costs of deploying mobile systems, preliminary estimates of equipment, maintenance, and operating costs over a 10-year period were prepared and options for purchase, lease, and privatization through fixed-price contracts considered.

  18. Investigation of turbine exhaust gas recirculation, base heating, and base pressure in the T-109 TsAGI wind tunnel for the IIAS ATLAS carrier model

    NASA Astrophysics Data System (ADS)

    Neiland, V.; Yereza, A.; Yermak, Y.; Zhirnikov, B.; Kudin, O.; Leites, Y.; Nesterov, Y.; Plyashechnik, V.

    Some quantitative data on gas recirculation in the carrier base region are presented which are obtained by measuring concentrations of chemical compounds and solving a set of equations for balance of chemical elements. The engine jets are simulated by solid fuel combustion products. The information concerning base region heating, base pressure and carrier surface pressure is also presented. The main objective of the investigation carried out is to identify the contribution of different sources to filling the IIAS ATLAS carrier model base region with gases. Four possible sources are considered; the central unit comprising one sustainer and two side liquid boosters, solid-rocket boosters, the turbopump assemblies and the free-stream flow.

  19. Strategic Planning and Information Systems.

    ERIC Educational Resources Information Center

    Shuman, Jack N.

    1982-01-01

    Discusses the functions of business planning systems and analyzes the underlying assumptions of the information systems that support strategic planning efforts within organizations. Development of a system framework, obstacles to the successful creation of strategic planning information systems, and resource allocation in organizations are…

  20. Planning Systems. SPEC Kit 13.

    ERIC Educational Resources Information Center

    Association of Research Libraries, Washington, DC. Office of Management Studies.

    This kit on planning systems updates a 1974 Management Studies Office Systems and Procedures Exchange Center (SPEC) kit in which developments in planning activities among Association of Research Libraries (ARL) were reviewed. At the time of the original study, in 1972, planning techniques and systems were a subject of much interest because rising…

  1. [Remote radiation planning support system].

    PubMed

    Atsumi, Kazushige; Nakamura, Katsumasa; Yoshidome, Satoshi; Shioyama, Yoshiyuki; Sasaki, Tomonari; Ohga, Saiji; Yoshitake, Tadamasa; Shinoto, Makoto; Asai, Kaori; Sakamoto, Katsumi; Hirakawa, Masakazu; Honda, Hiroshi

    2012-08-01

    We constructed a remote radiation planning support system between Kyushu University Hospital (KUH) in Fukuoka and Kyushu University Beppu Hospital (KBH) in Oita. Between two institutions, radiology information system for radiotherapy division (RT-RIS) and radiation planning system (RTPS) were connected by virtual private network (VPN). This system enables the radiation oncologists at KUH to perform radiotherapy planning for the patients at KBH. The detail of the remote radiation planning support system in our institutions is as follows: The radiation oncologist at KBH performs radiotherapy planning and the data of the patients are sent anonymously to the radiation oncologists at KUH. The radiation oncologists at KUH receive the patient's data, access to RTPS at KBH, verify or change the radiation planning at KBH: Radiation therapy is performed at KBH according to the confirmed plan by the radiation oncologists at KUH. Our remote radiation planning system is useful for providing radiation therapy with safety and accuracy.

  2. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  3. The impact of carbon dioxide and exhaust gas recirculation on the oxidative reactivity of soot from ethylene flames and diesel engines

    NASA Astrophysics Data System (ADS)

    Al-Qurashi, Khalid O.

    Restrictive emissions standards to reduce nitrogen oxides (NOx) and particulate matter (PM) emissions from diesel engines necessitate the development of advanced emission control technology. The engine manufacturers in the United States have implemented the exhaust gas recirculation (EGR) and diesel particulate filters (DPF) to meet the stringent emissions limits on NOx and PM, respectively. Although the EGR-DPF system is an effective means to control diesel engine emissions, there are some concerns associated with its implementation. The chief concern with this system is the DPF regenerability, which depends upon several factors, among which are the physicochemical properties of the soot. Despite the plethora of research that has been conducted on DPF regenerability, the impact of EGR on soot reactivity and DPF regenerability is yet to be examined. This work concerns the impact of EGR on the oxidative reactivity of diesel soot. It is part of ongoing research to bridge the gap in establishing a relationship between soot formation conditions, properties, and reactivity. This work is divided into three phases. In the first phase, carbon dioxide (CO2) was added to the intake charge of a single cylinder engine via cylinders of compressed CO2. This approach simulates the cold-particle-free EGR. The results showed that inclusion of CO2 changes the soot properties and yields synergistic effects on the oxidative reactivity of the resulting soot. The second phase of this research was motivated by the findings from the first phase. In this phase, post-flame ethylene soot was produced from a laboratory co-flow laminar diffusion flame to better understand the mechanism by which the CO2 affects soot reactivity. This phase was accomplished by successfully isolating the dilution, thermal, and chemical effects of the CO2. The results showed that all of these effects account for a measurable increase in soot reactivity. Nevertheless, the thermal effect was found to be the most

  4. UAVSAR Flight-Planning System

    NASA Technical Reports Server (NTRS)

    2008-01-01

    A system of software partly automates planning of a flight of the Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) -- a polarimetric synthetic-aperture radar system aboard an unpiloted or minimally piloted airplane. The software constructs a flight plan that specifies not only the intended flight path but also the setup of the radar system at each point along the path.

  5. A comparison of fuzzy logic and cluster renewal approaches for heat transfer modeling in a 1296 t/h CFB boiler with low level of flue gas recirculation

    NASA Astrophysics Data System (ADS)

    Błaszczuk, Artur; Krzywański, Jarosław

    2017-03-01

    The interrelation between fuzzy logic and cluster renewal approaches for heat transfer modeling in a circulating fluidized bed (CFB) has been established based on a local furnace data. The furnace data have been measured in a 1296 t/h CFB boiler with low level of flue gas recirculation. In the present study, the bed temperature and suspension density were treated as experimental variables along the furnace height. The measured bed temperature and suspension density were varied in the range of 1131-1156 K and 1.93-6.32 kg/m3, respectively. Using the heat transfer coefficient for commercial CFB combustor, two empirical heat transfer correlation were developed in terms of important operating parameters including bed temperature and also suspension density. The fuzzy logic results were found to be in good agreement with the corresponding experimental heat transfer data obtained based on cluster renewal approach. The predicted bed-to-wall heat transfer coefficient covered a range of 109-241 W/(m2K) and 111-240 W/(m2K), for fuzzy logic and cluster renewal approach respectively. The divergence in calculated heat flux recovery along the furnace height between fuzzy logic and cluster renewal approach did not exceeded ±2%.

  6. Electric utility system master plan

    SciTech Connect

    Erickson, O.M.

    1992-10-01

    This publication contains the electric utility system plan and guidelines for providing adequate electric power to the various facilities of Lawrence Livermore National Laboratory in support of the mission of the Laboratory. The topics of the publication include general information on the current systems and their operation, a planning analysis for current and future growth in energy demand, proposed improvements and expansions required to meet long range site development and the site`s five-year plan.

  7. Planning Systems for Technical Education

    ERIC Educational Resources Information Center

    Young, D. R.

    1974-01-01

    The planning of technical education programs often is a complex and involved process. Some kind of planning system helps serve as an effective method of communicating the purpose, procedure, processes, content, time, and cost to those who need this decision-making information. (Flow charts are included.) (Author)

  8. Institutional Planning: A Systems Approach.

    ERIC Educational Resources Information Center

    Adamson, Willie D.

    This four-chapter report explores the possible contributions of a systems approach to institutional planning. After introductory comments, Chapter I reviews the management theory of Henry Fayol, which emphasizes management tasks, such as planning, organizing, commanding, coordinating, and controlling, which are "universal" regardless of the level…

  9. Simultaneous high-speed gas property measurements at the exhaust gas recirculation cooler exit and at the turbocharger inlet of a multicylinder diesel engine using diode-laser-absorption spectroscopy.

    PubMed

    Jatana, Gurneesh S; Magee, Mark; Fain, David; Naik, Sameer V; Shaver, Gregory M; Lucht, Robert P

    2015-02-10

    A diode-laser-absorption-spectroscopy-based sensor system was used to perform high-speed (100 Hz to 5 kHz) measurements of gas properties (temperature, pressure, and H(2)O vapor concentration) at the turbocharger inlet and at the exhaust gas recirculation (EGR) cooler exit of a diesel engine. An earlier version of this system was previously used for high-speed measurements of gas temperature and H(2)O vapor concentration in the intake manifold of the diesel engine. A 1387.2 N m tunable distributed feedback diode laser was used to scan across multiple H(2)O absorption transitions, and the direct absorption signal was recorded using a high-speed data acquisition system. Compact optical connectors were designed to conduct simultaneous measurements in the intake manifold, the EGR cooler exit, and the turbocharger inlet of the engine. For measurements at the turbocharger inlet, these custom optical connectors survived gas temperatures as high as 800 K using a simple and passive arrangement in which the temperature-sensitive components were protected from high temperatures using ceramic insulators. This arrangement reduced system cost and complexity by eliminating the need for any active water or oil cooling. Diode-laser measurements performed during steady-state engine operation were within 5% of the thermocouple and pressure sensor measurements, and within 10% of the H(2)O concentration values derived from the CO(2) gas analyzer measurements. Measurements were also performed in the engine during transient events. In one such transient event, where a step change in fueling was introduced, the diode-laser sensor was able to capture the 30 ms change in the gas properties; the thermocouple, on the other hand, required 7.4 s to accurately reflect the change in gas conditions, while the gas analyzer required nearly 600 ms. To the best of our knowledge, this is the first implementation of such a simple and passive arrangement of high-temperature optical connectors as well

  10. Employee Benefit Plans and Personal Financial Planning with Expert Systems.

    ERIC Educational Resources Information Center

    Phillips, Mary Ellen; And Others

    1992-01-01

    This paper analyzes four personal financial planning "expert systems," which institutions of higher education might offer their employees. Such computerized planning systems, like comprehensive plans and professional planners, help families manage their assets and obligations during their lifetimes and plan for distributing their wealth…

  11. Preliminary logging analysis system (PLANS): overview.

    Treesearch

    R.H. Twito; S.E. Reutebuch; R.J. McGaughey; C.N. Mann

    1987-01-01

    The paper previews a computer-aided design system, PLANS, that is useful for developing timber harvest and road network plans on large-scale topographic maps. Earlier planning techniques are reviewed, and the advantages are explained of using advanced planning systems like PLANS. There is a brief summary of the input, output, and function of each program in the PLANS...

  12. Nascom System Development Plan: System Description, Capabilities and Plans

    NASA Technical Reports Server (NTRS)

    1995-01-01

    The NASA Communications (Nascom) System Development Plan (NSDP), reissued annually, describes the organization of Nascom, how it obtains communication services, its current systems, its relationship with other NASA centers and International Partner Agencies, some major spaceflight projects which generate significant operational communication support requirements, and major Nascom projects in various stages of development or implementation.

  13. Gas recirculator for acyclic machines

    NASA Astrophysics Data System (ADS)

    Balsa, T. F.

    1985-05-01

    The present invention relates to acyclic machines of the type using liquid metal collectors, and more particularly to an improvement for retaining the liquid metal in such machines. Radial type acyclic motors and generators generally include a metallic disk rotor rotating on a shaft between electromagnetic stator poles excited by field coils wound concentric with the shaft. Instead of solid brush, current collectors at the rotor periphery, liquid metal collectors are sometimes used to close the electrical current loop between the shaft and the rotor, and an inert pressurized cover gas fills the gaps between the rotating components and the stationary housing. A cover has recirculator in an acyclic generator having liquid metal collectors for reducing entrainment of the liquid metal in the gas. Radial passages in the stator housing provide natural recirculating paths for the cover gas to flow radially outward along the sides of the rotor and return inwardly through the passages. Scoops or lips located inward of the liquid metal collector divert the outward gas flow into the passages to minimize contact of the gas with the liquid metal.

  14. LDEF archival system plan

    NASA Technical Reports Server (NTRS)

    Wilson, Brenda K.

    1993-01-01

    The Long Duration Exposure Facility (LDEF) has provided the first significant opportunity to extensively study the space environment and its effects upon spacecraft systems and materials. The long-term value of the data obtained from LDEF, which is applicable to a wide range of areas including space environment definition, space environmental effects, and spacecraft design, will depend upon the system developed to archive and retrieve the data. Therefore, in addition to the large effort undertaken to analyze LDEF data, a substantial effort is also necessary in order to retain and disseminate LDEF resources for future research and design. W. J. Schafer Associates, Inc., has a task subcontract to develop the LDEF archival system. The LDEF resources include data, hardware, photographic records, and publications which cover the 20-year history of LDEF from concept design through data analysis. Chronologically, prelaunch resources include documentation of facility and experiment development, testing integration, and operation. Post-retrieval resources are the observations, testing, analysis, and publications since the January 1990 retrieval of LDEF. A third set of resources is the experiment and facility hardware and specimens, including more than 10,000 test specimens flown on LDEF and subsequently divided and distributed among investigators at numerous laboratories. Many valuable science and technology investigations were undertaken with LDEF experiments and hardware, and many more investigations are being identified in areas not yet explored. LDEF data applications encompass primarily low-Earth orbit spacecraft and structures. The nearly six-year space exposure of LDEF has provided data to evaluate materials, systems, and living specimens exposed to radiation, meteoroids, debris, and other constituents of the low-Earth environment. Structural, mechanical, electrical, optical, and thermal systems were studied, and materials with applications in all aspects of space

  15. An experimental and numerical investigation on the influence of external gas recirculation on the HCCI autoignition process in an engine: Thermal, diluting, and chemical effects

    SciTech Connect

    Machrafi, Hatim; Cavadias, Simeon; Guibert, Philippe

    2008-11-15

    In order to contribute to the solution of controlling the autoignition in a homogeneous charge compression ignition (HCCI) engine, parameters linked to external gas recirculation (EGR) seem to be of particular interest. Experiments performed with EGR present some difficulties in interpreting results using only the diluting and thermal aspect of EGR. Lately, the chemical aspect of EGR is taken more into consideration, because this aspect causes a complex interaction with the dilution and thermal aspects of EGR. This paper studies the influence of EGR on the autoignition process and particularly the chemical aspect of EGR. The diluents present in EGR are simulated by N{sub 2} and CO{sub 2}, with dilution factors going from 0 to 46 vol%. For the chemically active species that could be present in EGR, the species CO, NO, and CH{sub 2}O are used. The initial concentration in the inlet mixture of CO and NO is varied between 0 and 170 ppm, while that of CH{sub 2}O alters between 0 and 1400 ppm. For the investigation of the effect of the chemical species on the autoignition, a fixed dilution factor of 23 vol% and a fixed EGR temperature of 70 C are maintained. The inlet temperature is held at 70 C, the equivalence ratios between 0.29 and 0.41, and the compression ratio at 10.2. The fuels used for the autoignition are n-heptane and PRF40. It appeared that CO, in the investigated domain, did not influence the ignition delays, while NO had two different effects. At concentrations up until 45 ppm, NO advanced the ignition delays for the PRF40 and at higher concentrations, the ignition delayed. The influence of NO on the autoignition of n-heptane seemed to be insignificant, probably due to the higher burn rate of n-heptane. CH{sub 2}O seemed to delay the ignition. The results suggested that especially the formation of OH radicals or their consumption by the chemical additives determines how the reactivity of the autoignition changed. (author)

  16. How to Plan Ventilation Systems.

    ERIC Educational Resources Information Center

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  17. How to Plan Ventilation Systems.

    ERIC Educational Resources Information Center

    Clarke, John H.

    1963-01-01

    Ventilation systems for factory safety demand careful planning. The increased heat loads and new processes of industry have introduced complex ventilation problems in--(1) ventilation supply, (2) duct work design, (3) space requirements, (4) hood face velocities, (5) discharge stacks, and (6) building eddies. This article describes and diagrams…

  18. NASA's Radioisotope Power Systems - Plans

    NASA Technical Reports Server (NTRS)

    Hamley, John A.; Mccallum, Peter W.; Sandifer, Carl E., II; Sutliff, Thomas J.; Zakrajsek, June F.

    2015-01-01

    NASA's Radioisotope Power Systems (RPS) Program continues to plan and implement content to enable planetary exploration where such systems could be needed, and to prepare more advanced RPS technology for possible infusion into future power systems. The 2014-2015 period saw significant changes, and strong progress. Achievements of near-term objectives have enabled definition of a clear path forward in which payoffs from research investments and other sustaining efforts can be applied. The future implementation path is expected to yield a higher-performing thermoelectric generator design, a more isotope-fuel efficient system concept design, and a robust RPS infrastructure maintained effectively within both NASA and the Department of Energy. This paper describes recent work with an eye towards the future plans that result from these achievements.

  19. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1991-01-01

    The design and functions of ALEPS (Automated Logistics Element Planning System) is a computer system that will automate planning and decision support for Space Station Freedom Logistical Elements (LEs) resupply and return operations. ALEPS provides data management, planning, analysis, monitoring, interfacing, and flight certification for support of LE flight load planning activities. The prototype ALEPS algorithm development is described.

  20. Business System Planning Project, Preliminary System Design

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    CH2M HILL Hanford Group, Inc. (CHG) is currently performing many core business functions including, but not limited to, work control, planning, scheduling, cost estimating, procurement, training, and human resources. Other core business functions are managed by or dependent on Project Hanford Management Contractors including, but not limited to, payroll, benefits and pension administration, inventory control, accounts payable, and records management. In addition, CHG has business relationships with its parent company CH2M HILL, U.S. Department of Energy, Office of River Protection and other River Protection Project contractors, government agencies, and vendors. The Business Systems Planning (BSP) Project, under the sponsorship of the CH2M HILL Hanford Group, Inc. Chief Information Officer (CIO), have recommended information system solutions that will support CHG business areas. The Preliminary System Design was developed using the recommendations from the Alternatives Analysis, RPP-6499, Rev 0 and will become the design base for any follow-on implementation projects. The Preliminary System Design will present a high-level system design, providing a high-level overview of the Commercial-Off-The-Shelf (COTS) modules and identify internal and external relationships. This document will not define data structures, user interface components (screens, reports, menus, etc.), business rules or processes. These in-depth activities will be accomplished at implementation planning time.

  1. Remote Excavation System test plan

    SciTech Connect

    Walker, S.; Hyde, R.A.

    1993-05-01

    The Office of Technology Development (OTD) established the Robotics Technology Development Program (RTDP) to integrate robotic development activities on a national basis; provide needs-oriented, timely, and economical robotics technology to support environmental and waste operations activities at Department of Energy (DOE) sites; and provide the focus and direction for the near term (less than five years) and guidance for the tong-term (five to twenty years) research and development efforts for site-specific problems. The RTDP consists of several programs including the Buried Waste Robotics Program (BWRP), which addresses remote buried waste applications. The Remote Excavation System (RES) was developed under the RTDP to provide a safer method of excavating hazardous materials for both the DOE and the Department of Defense (DOD). The excavator, initially developed by the DOD as a manually-operated small excavator, has been modified for teleoperation with joint funding from the BWRP and the DOD. The Buried Waste Integrated Demonstration (BWID) and the Uranium Soils Integrated Demonstration (USID) are funding the demonstration, testing, and evaluation of the RES covered in this test plan. This document covers testing both at Oak Ridge National Laboratory (ORNL) and the Idaho National Engineering Laboratory (INEL), as funded by BWID and USID. This document describes the tests planned for the RES demonstration for the BWRP. The purposes of the test plan are (1) to establish test parameters to ensure that the demonstration results are deemed useful and usable and (2) to demonstrate performance in a safe manner within all regulatory requirements.

  2. A System for Planning Ahead

    NASA Technical Reports Server (NTRS)

    2002-01-01

    A software system that uses artificial intelligence techniques to help with complex Space Shuttle scheduling at Kennedy Space Center is commercially available. Stottler Henke Associates, Inc.(SHAI), is marketing its automatic scheduling system, the Automated Manifest Planner (AMP), to industries that must plan and project changes many different times before the tasks are executed. The system creates optimal schedules while reducing manpower costs. Using information entered into the system by expert planners, the system automatically makes scheduling decisions based upon resource limitations and other constraints. It provides a constraint authoring system for adding other constraints to the scheduling process as needed. AMP is adaptable to assist with a variety of complex scheduling problems in manufacturing, transportation, business, architecture, and construction. AMP can benefit vehicle assembly plants, batch processing plants, semiconductor manufacturing, printing and textiles, surface and underground mining operations, and maintenance shops. For most of SHAI's commercial sales, the company obtains a service contract to customize AMP to a specific domain and then issues the customer a user license.

  3. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  4. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the...

  5. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... annual review of its system safety program plan and system security plan. (b) In the event the rail transit agency's system safety program plan is modified, the rail transit agency must submit the modified... agency. (c) In the event the rail transit agency's system security plan is modified, the rail transit...

  6. MES & planning systems depend on each other

    SciTech Connect

    Martocci, J.

    1995-02-01

    Integrating planning systems with manufacturing execution systems (MES) creates an entity whose whole is greater than the sum of its parts. Without the data provided by MES, planning systems are functionally limited. Similarly, an MES without a planning system can`t be used to its full potential. Planning systems, such as COMMS (Customer Oriented Manufacturing Management Systems), MRP (Material Resource Planning) and ERP (Enterprise Resource Planning), constitute one of the three {open_quotes}layers{close_quotes} of information systems in an overall manufacturing management structure. They target customer-related data that ultimately plans and shapes the manufacturing enterprise. At the other end of the manufacturing management model is the control layer, which manages specific production processes, such as machinery operations. This layer is also where data collection rests. MES was developed to fill a gap between planning and controls. What makes MES key to the entire enterprise is its ability to provide the real-time information needed to effectively manage manufacturing activities. Without the shop floor information generated by MES, real-time planning really isn`t possible. The problem with planning systems in the past has been that while they do a good job planning, the plans often are not based on reality. What is really occurring on the factory floor, and what is possible, can be very dynamic. If planning is to be effective, it must have current information and the ability to factor that data into a constantly changing process. With the real-time shop floor information it provides, MES makes planning significantly more viable. Integration benefits both types of systems. For example, the real-time status that MES gives to the planning department eliminates many erroneous exception messages in the short term. This allows planners to concentrate on better medium-to-long-term planning. 1 fig.

  7. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  8. HLW system plan - revision 2

    SciTech Connect

    Not Available

    1994-01-14

    The projected ability of the Tank Farm to support DWPF startup and continued operation has diminished somewhat since revision 1 of this Plan. The 13 month delay in DWPF startup, which actually helps the Tank Farm condition in the near term, was more than offset by the 9 month delay in ITP startup, the delay in the Evaporator startups and the reduction to Waste Removal funding. This Plan does, however, describe a viable operating strategy for the success of the HLW System and Mission, albeit with less contingency and operating flexibility than in the past. HLWM has focused resources from within the division on five near term programs: The three evaporator restarts, DWPF melter heatup and completion of the ITP outage. The 1H Evaporator was restarted 12/28/93 after a 9 month shutdown for an extensive Conduct of Operations upgrade. The 2F and 2H Evaporators are scheduled to restart 3/94 and 4/94, respectively. The RHLWE startup remains 11/17/97.

  9. Business System Planning Project System Requirements Specification

    SciTech Connect

    NELSON, R.E.

    2000-09-08

    The purpose of the Business Systems Planning Project System Requirements Specification (SRS) is to provide the outline and contents of the requirements for the CH2M HILL Hanford Group, Inc. (CHG) integrated business and technical information systems. The SRS will translate proposed objectives into the statement of the functions that are to be performed and data and information flows that they require. The requirements gathering methodology will use (1) facilitated group requirement sessions; (2) individual interviews; (3) surveys; and (4) document reviews. The requirements will be verified and validated through coordination of the technical requirement team and CHG Managers. The SRS document used the content and format specified in Lockheed Martin Services, Inc. Organization Standard Software Practices in conjunction with the Institute of Electrical and Electronics Engineers Standard 8340-1984 for Systems Requirements Documents.

  10. Marketing and planning in multihospital systems.

    PubMed

    Gourley, D R; Moore, M E

    1988-01-01

    Marketing and planning functions at the corporate level of multihospital systems are examined. Drawing on the experiences of executives in 30 multihospital systems located in the United States west of the Mississippi, this article describes the differences in the marketing and planning functions by for-profit, not-for-profit, and church-owned multihospital systems; examines the impact of age, number of hospitals, and average hospital bed size of the systems; provides insights regarding the primary persons involved in the marketing and planning functions; and highlights the important future of marketing and planning by the top management of multihospital systems.

  11. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ; KIRKBRIDE RA; HOHL TM; EMPEY PA; WELLS MN

    2009-09-15

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal

  12. Instructor's Plan: A Lesson Planning Expert System for School Teachers.

    ERIC Educational Resources Information Center

    Wilkins, Dennis A.; And Others

    The product of several years of research and development at Brigham Young University, Instructor's Plan (IP) is an expert system for rapid lesson design and authoring. Its primary audience is preservice and inservice school teachers. It will run on IBM PC, XT, AT, and PS/2 systems and compatibles with a color monitor and at least one floppy disk…

  13. RIVER PROTECTION PROJECT SYSTEM PLAN

    SciTech Connect

    CERTA PJ

    2008-07-10

    The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, the ORP is responsible for the retrieval, treatment, and disposal of the approximately 57 million gallons of radioactive waste contained in the Hanford Site waste tanks and closure of all the tanks and associated facilities. The previous revision of the System Plan was issued in September 2003. ORP has approved a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. The ORP has established contracts to implement this strategy to establish a basic capability to complete the overall mission. The current strategy for completion of the mission uses a number of interrelated activities. The ORP will reduce risk to the environment posed by tank wastes by: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) for treatment and disposal; (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) and about half of the low-activity waste (LAW) contained in the tank farms, and maximizing its capability and capacity; (3) Developing and deploying supplemental treatment capability or a second WTP LAW Facility that can safely treat about half of the LAW contained in the tank farms; (4) Developing and deploying treatment and packaging capability for transuranic (TRU) tank waste for shipment to and disposal at the Waste Isolation Pilot Plant (WIPP); (5) Deploying interim storage capacity for the immobilized HLW and shipping that waste to Yucca Mountain for disposal; (6) Operating the Integrated Disposal Facility for the disposal of immobilized LAW, along with the associated secondary waste, (7) Closing the SST and DST tank farms, ancillary facilities, and al1 waste

  14. School Planning, Evaluation and Communication System (SPECS).

    ERIC Educational Resources Information Center

    Flocco, Edward C.

    A comprehensive school planning tool is available from General Learning Corporation and the Center for the Advanced Study of Educational Administration at the University of Oregon. This School Planning, Evaluation and Communication System (SPECS) provides a deliverable system of training, implementation strategies and materials and technical…

  15. Tank waste remediation system environmental program plan

    SciTech Connect

    Borneman, L.E.

    1998-01-09

    This Environmental Program Plan has been developed in support of the Integrated Environmental, Safety and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan (RL 1996a), and the specifications and guidance for ANSI/ISO 14001-1996, Environmental Management Systems Specification with guidance for use (ANSI/ISO 1996).

  16. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  17. Postimplementation Planning and Organizational Structure of Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Wilson, Charmaine V.

    2012-01-01

    Globalization, rapid technological changes, and competitive pressures have resulted in company leaders' worldwide adopting of enterprise resource planning (ERP) systems to improve productivity and business operations and reduce costs in the post-implementation phase. The research addressed organizational leaders' inability to optimize…

  18. Enroute flight planning: The design of cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, Elaine

    1990-01-01

    Design concepts and principles to guide in the building of cooperative problem solving systems are being developed and evaluated. In particular, the design of cooperative systems for enroute flight planning is being studied. The investigation involves a three stage process, modeling human performance in existing environments, building cognitive artifacts, and studying the performance of people working in collaboration with these artifacts. The most significant design concepts and principles identified thus far are the principle focus.

  19. Analyses of Heliport System Plans.

    DTIC Science & Technology

    1988-02-01

    transport is considered. The obvious potential societal and economic benefits connected with airplane travel, not to mention the romance and sense of...heliport planning documents were the first of a new genre of aviation study. The planners who did them were breaking new ground,I with no established

  20. The Archimedes 2 mechanical assembly planning system

    SciTech Connect

    Kaufman, S.G.; Wilson, R.H.; Jones, R.E.; Calton, T.L.; Ames, A.L.

    1996-03-01

    We describe the implementation and performance of Archimedes 2, an integrated mechanical assembly planning system. Archimedes 2 includes two planners, two assembly sequence animation facilities, and an associated robotic workcell. Both planners use full 3 dimensional data. A rudimentary translator from high level assembly plans to control code for the robotic workcell has also been implemented. We can translate data from a commercial CAD system into input data for the system, which has allowed us to plan assembly sequences for many industrial assemblies. Archimedes 2 has been used to plan sequences for assemblies consisting of 5 to 109 parts. We have also successfully taken a CAD model of an assembly, produced an optimized assembly sequence for it, and translated the plan into robot code, which successfully assembles the device specified in the model.

  1. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-05

    This program plan establishes the framework for conduct of the Tank Waste Remediation System (TWRS) Project. The plan focuses on the TWRS Retrieval and Disposal Mission and is specifically intended to support the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing firm contracts for waste immobilization.

  2. Career Planning System. Microcomputer Version. Student Guide.

    ERIC Educational Resources Information Center

    Neuman, Delia; Long, James P.

    This student guide is part of the microcomputer version of the Career Planning System (CPS). CPS is a comprehensive instructional package designed to provide individualized career exploration and career planning experiences for students of approximately middle-school age. This version is designed to take advantage of the motivational, managerial,…

  3. Not planning a sustainable transport system

    SciTech Connect

    Finnveden, Göran Åkerman, Jonas

    2014-04-01

    The overall objective of the Swedish transport policy is to ensure the economically efficient and sustainable provision of transport services for people and business throughout the country. More specifically, the transport sector shall, among other things, contribute to the achievement of environmental quality objectives in which the development of the transport system plays an important role in the achievement of the objectives. The aim of this study is to analyse if current transport planning supports this policy. This is done by analysing two recent cases: the National Infrastructure Plan 2010–2021, and the planning of Bypass Stockholm, a major road investment. Our results show that the plans are in conflict with several of the environmental quality objectives. Another interesting aspect of the planning processes is that the long-term climate goals are not included in the planning processes, neither as a clear goal nor as factor that will influence future transport systems. In this way, the long-term sustainability aspects are not present in the planning. We conclude that the two cases do not contribute to a sustainable transport system. Thus, several changes must be made in the processes, including putting up clear targets for emissions. Also, the methodology for the environmental assessments needs to be further developed and discussed. - Highlights: • Two cases are studied to analyse if current planning supports a sustainable transport system. • Results show that the plans are in conflict with several of the environmental quality objectives. • Long-term climate goals are not included in the planning processes. • Current practices do not contribute to a sustainable planning processes. • Methodology and process for environmental assessments must be further developed and discussed.

  4. Integral reactor system and method for fuel cells

    DOEpatents

    Fernandes, Neil Edward; Brown, Michael S; Cheekatamarla, Praveen; Deng, Thomas; Dimitrakopoulos, James; Litka, Anthony F

    2013-11-19

    A reactor system is integrated internally within an anode-side cavity of a fuel cell. The reactor system is configured to convert hydrocarbons to smaller species while mitigating the lower production of solid carbon. The reactor system may incorporate one or more of a pre-reforming section, an anode exhaust gas recirculation device, and a reforming section.

  5. Integral reactor system and method for fuel cells

    DOEpatents

    Fernandes, Neil Edward; Brown, Michael S.; Cheekatamaria, Praveen; Deng, Thomas; Dimitrakopoulos, James; Litka, Anthony F.

    2017-03-07

    A reactor system is integrated internally within an anode-side cavity of a fuel cell. The reactor system is configured to convert higher hydrocarbons to smaller species while mitigating the lower production of solid carbon. The reactor system may incorporate one or more of a pre-reforming section, an anode exhaust gas recirculation device, and a reforming section.

  6. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1992-01-01

    ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

  7. The Automated Logistics Element Planning System (ALEPS)

    NASA Technical Reports Server (NTRS)

    Schwaab, Douglas G.

    1992-01-01

    ALEPS, which is being developed to provide the SSF program with a computer system to automate logistics resupply/return cargo load planning and verification, is presented. ALEPS will make it possible to simultaneously optimize both the resupply flight load plan and the return flight reload plan for any of the logistics carriers. In the verification mode ALEPS will support the carrier's flight readiness reviews and control proper execution of the approved plans. It will also support the SSF inventory management system by providing electronic block updates to the inventory database on the cargo arriving at or departing the station aboard a logistics carrier. A prototype drawer packing algorithm is described which is capable of generating solutions for 3D packing of cargo items into a logistics carrier storage accommodation. It is concluded that ALEPS will provide the capability to generate and modify optimized loading plans for the logistics elements fleet.

  8. A review of mission planning systems

    NASA Technical Reports Server (NTRS)

    Jones, M.; Sorensen, E. M.; Wolff, T.; Haddow, C. R.

    1993-01-01

    A general definition of Mission Planning is given. The definition covers the full scope of an end-to-end mission planning system. Noting the mission-specific nature of most mission planning systems, a classification of autonomous spacecraft missions is made into Observatory, Survey, multi-instrument science, and Telecommunications missions. The mission planning approach for one mission in each category is examined critically. The following missions were chosen: ISO (Infrared Space Observatory); ERS-1 (European Remote Sensing Satellite); and Eureca (European Retrievable Carrier). The paper gives a summary of lessons learned from these missions suggesting improvements in areas such as requirements analysis, testing, user interfacing, rules, and constraints handling. The paper will also examine commonalities in functions, which could constitute a basis for identification of generic mission planning support tools.

  9. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  10. Draft Automatic Data Acquisition System Plan

    SciTech Connect

    Not Available

    1987-04-01

    This Automatic Data Acquisition System (ADAS) Plan has been prepared in support of the requirement for detailed site characterization of the Deaf Smith County candidate repository site in salt, and describes the data acquisition system which will be used for unattended data collection from the geotechnical instrumentation installed at the site. Section 1.1 discusses the programmatic background to the plan, Section 1.2 presents the scope and purpose of the plan, and the organization of the document is given in Section 1.3. 31 refs., 34 figs., 8 tabs.

  11. Technology planning for flexible manufacturing systems

    NASA Astrophysics Data System (ADS)

    Chudakov, A. D.; Falevich, B. Y.

    1984-12-01

    The machine building industry features a new type of equipment, the flexible technological systems for machining. These systems are based on the use of machine tools with CNC, linked to a central controlling computer and an automated transport and stockpiling system. To improve the effectiveness of integrated operation of the system's equipment, the software of the central computer includes an applied program package directed toward the performance of automated planning functions, which, together with the operating documentation, makes up a system of operational calendar planning.

  12. Tennessee trauma care system plan, Part II.

    PubMed

    Phillips, Joseph B; Barker, Donald; Enderson, Blaine

    2005-04-01

    Tennessee implemented a statewide trauma care system in 1988. This system serves the state of Tennessee and supports eight neighboring states. The demographics and geography of Tennessee have ensured that nearly all residents have rapid access to the trauma care system. However, since 1988, many changes have occurred in healthcare in general, and trauma care in particular, that point out problems and issues with the Tennessee trauma care system. Therefore, the Tennessee Trauma Care Advisory Council has developed this Trauma Care System Plan to look at needs and opportunities for the future of trauma care in Tennessee. This plan will be presented in four segments: History, Administrative Components, Operational Components, and Clinical Components.

  13. Tennessee trauma care system plan, Part 1.

    PubMed

    Phillips, Joseph B; Barker, Donald; Dunn, Julie; Enderson, Blaine

    2005-03-01

    Tennessee implemented a statewide trauma care system in 1988. This system serves the state of Tennessee and supports eight neighboring states. The demographics and geography of Tennessee have ensured that nearly all residents have rapid access to the trauma care system. However, since 1988, many changes have occurred in healthcare in general, and trauma care in particular, that point out problems and issues with the Tennessee trauma care system. Therefore, the Tennessee Trauma Care Advisory Council has developed this Trauma Care System Plan to look at needs and opportunities for the future of trauma care in Tennessee. This plan will be presented in four segments: History, Administrative Components, Operational Components, and Clinical Components.

  14. Tennessee Trauma Care System Plan, part III.

    PubMed

    Phillips, Joseph B; Barker, Donald; Enderson, Blaine

    2005-05-01

    Tennessee implemented a statewide trauma care system in 1988. This system serves the state of Tennessee and supports eight neighboring states. The demographics and geography of Tennessee have ensured that nearly all residents have rapid access to the trauma care system. However, since 1988, many changes have occurred in healthcare in general, and trauma care in particular, that point out problems and issues with the Tennessee trauma care system. Therefore, the Tennessee Trauma Care Advisory Council has developed this Trauma Care System Plan to look at needs and opportunities for the future of trauma care in Tennessee. This plan will be presented in four segments: History, Administrative Components, Operational Components, and Clinical Components.

  15. Airborne flight planning and information system

    SciTech Connect

    Cline, J.D.; Wilson, J.A.; Feher, S.H.; Ward, G.D.

    1987-02-10

    A flight planning system is described for use with an aircraft having a computerized navigation system comprising: a data center at a first site that is remotely located from the aircraft includes a database storing navigation route information, performance characteristics for the aircraft and weather data, along with processing means responsive to flight plan input information for generating flight plans from the database. The processor of the data center is accessible by means of a data communications link for transmitting the flight plan input information to the data center from a second site remote from both the aircraft and the data center and for transmitting the flight plans to the second remote site; a portable computer for use at a location remote from the aircraft. The portable computer has a processor, a memory, data input means for permitting an operator to input flight planning data, display means for displaying data to an operator and data recording means for recording one or more flight plans on a storage medium; data communications means for selectively establishing a data communication link between the portable computer and the data center; and a data transfer unit secured within the aircraft including means for receiving and reading the storage medium and reading the one or more flight plans recorded on the storage medium.

  16. Automated Evaluation System for the Joint Planning (JPLAN) Exercise System

    DTIC Science & Technology

    1988-09-01

    are presented with a partially completed Operations Plan based on a fictitious scenario in which planning for the defense of Iguana , an American ally...ADP) computer system (9:2). 1 In the JPLAN simulation scenario, plan development for the defense of Iguana , a fictitious ally of the United States, is...already underway with planning for four of the six bases in Iguana complete (2:3). The students are presented with a simulated intelligence report on

  17. Planning for an Irrigation System.

    ERIC Educational Resources Information Center

    Turner, J. Howard; Anderson, Carl L.

    The publication, with the aid of tables and colored illustrations and diagrams, presents information to help the farmer who is considering the installation of an irrigation system determine whether or not to irrigate, the type of system to use, and the irrigation cost and return on investment. Information is presented on the increase in yield to…

  18. Planning for an Irrigation System.

    ERIC Educational Resources Information Center

    Turner, J. Howard; Anderson, Carl L.

    The publication, with the aid of tables and colored illustrations and diagrams, presents information to help the farmer who is considering the installation of an irrigation system determine whether or not to irrigate, the type of system to use, and the irrigation cost and return on investment. Information is presented on the increase in yield to…

  19. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  20. Direct numerical simulations of exhaust gas recirculation effect on multistage autoignition in the negative temperature combustion regime for stratified HCCI flow conditions by using H2O2 addition

    NASA Astrophysics Data System (ADS)

    El-Asrag, Hossam A.; Ju, Yiguang

    2013-04-01

    Direct numerical simulations (DNSs) of a stratified flow in a homogeneous compression charge ignition (HCCI) engine are performed to investigate the exhaust gas recirculation (EGR) and temperature/mixture stratification effects on the autoignition of synthetic dimethyl ether (DME) in the negative temperature combustion region. Detailed chemistry for a DME/air mixture is employed and solved by a hybrid multi-time scale (HMTS) algorithm to reduce the computational cost. The effect of ? to mimic the EGR effect on autoignition are studied. The results show that adding ? enhances autoignition by rapid OH radical pool formation (34-46% reduction in ignition delay time) and changes the ignition heat release rates at different ignition stages. Sensitivity analysis is performed and the important reactions pathways affecting the autoignition are specified. The DNS results show that the scales introduced by thermal and mixture stratifications have a strong effect after the low temperature chemistry (LTC) ignition especially at the locations of high scalar dissipation rates. Compared to homogenous ignition, stratified ignitions show similar first autoignition delay times, but 18% reduction in the second and third ignition delay times. The results also show that molecular transport plays an important role in stratified low temperature ignition, and that the scalar mixing time scale is strongly affected by local ignition in the stratified flow. Two ignition-kernel propagation modes are observed: a wave-like, low-speed, deflagrative mode and a spontaneous, high-speed, ignition mode. Three criteria are introduced to distinguish these modes by different characteristic time scales and Damkhöler numbers using a progress variable conditioned by an ignition kernel indicator. The low scalar dissipation rate flame front is characterized by high displacement speeds and high mixing Damkhöler number. The proposed criteria are applied successfully at the different ignition stages and

  1. Planning Programming Budgeting System: Fiscal Year 1971.

    ERIC Educational Resources Information Center

    El Dorado County Board of Education, Placerville, CA.

    To increase the efficiency of human and financial resource allocations, the El Dorado County, California, Office of Education initiated a planning, programing, budgeting system (PPBS). This document is a progress report on the effectiveness of the system after one year of operation. It contains (1) a statement on goals, (2) charts of the program…

  2. Power system expansion planning under uncertainty

    SciTech Connect

    Gorenstin, B.G.; Campodonico, N.M.; Costa, J.P.; Pereira, M.V.F. . Centro de Pesquisas de Energia Electrica)

    1993-02-01

    This paper describes a methodology for expansion planning of power systems under several uncertainty factors such as demand growth, fuel cost, delay in project completion, financial constraints etc. The solution approach is based on stochastic optimization techniques, decision analysis, and multiobjective tradeoff analysis. Case studies with the Brazilian system are presented and discussed.

  3. GPLAN: A Generalized Data Base Planning System.

    ERIC Educational Resources Information Center

    Nunamaker, J. F., Jr.; And Others

    It is recognized that there is a major gap between the promises of large data bases and optimization and simulation models and their actual ability to solve real world problems. This document describes a Generalized Data Base Planning System (GPLAN), currently being developed at Purdue University, that is proposed as a system to bridge this gap. A…

  4. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: A planning parameters study

    SciTech Connect

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W. Robert; Yin, Fang-Fang; Wu, Q. Jackie

    2013-11-15

    Purpose: Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (∼2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning).Methods: Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency.Results: All online reoptimized plans were finished within ∼2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the

  5. Strategies for automatic online treatment plan reoptimization using clinical treatment planning system: a planning parameters study.

    PubMed

    Li, Taoran; Wu, Qiuwen; Zhang, You; Vergalasova, Irina; Lee, W Robert; Yin, Fang-Fang; Wu, Q Jackie

    2013-11-01

    Adaptive radiation therapy for prostate cancer using online reoptimization provides an improved control of interfractional anatomy variations. However, the clinical implementation of online reoptimization is currently limited by the low efficiency of current strategies and the difficulties associated with integration into the current treatment planning system. This study investigates the strategies for performing fast (~2 min) automatic online reoptimization with a clinical fluence-map-based treatment planning system; and explores the performance with different input parameters settings: dose-volume histogram (DVH) objective settings, starting stage, and iteration number (in the context of real time planning). Simulated treatments of 10 patients were reoptimized daily for the first week of treatment (5 fractions) using 12 different combinations of optimization strategies. Options for objective settings included guideline-based RTOG objectives, patient-specific objectives based on anatomy on the planning CT, and daily-CBCT anatomy-based objectives adapted from planning CT objectives. Options for starting stages involved starting reoptimization with and without the original plan's fluence map. Options for iteration numbers were 50 and 100. The adapted plans were then analyzed by statistical modeling, and compared both in terms of dosimetry and delivery efficiency. All online reoptimized plans were finished within ~2 min with excellent coverage and conformity to the daily target. The three input parameters, i.e., DVH objectives, starting stage, and iteration number, contributed to the outcome of optimization nearly independently. Patient-specific objectives generally provided better OAR sparing compared to guideline-based objectives. The benefit in high-dose sparing from incorporating daily anatomy into objective settings was positively correlated with the relative change in OAR volumes from planning CT to daily CBCT. The use of the original plan fluence map as the

  6. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system...

  7. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system...

  8. The Closed-Loop Planning System for Weapon System Readiness

    DTIC Science & Technology

    2006-01-01

    across weapon systems to meet sortie and availability goals given operational plans, logistics support infrastructure, and funding constraints. The...are mission capable. In the case of the planning system , the important rate is the converse of this rate: aircraft that are not mission capable, supply...training squadron USAFE U.S. Air Force Europe VSL variable safety level WG wing WSMIS Weapon System Management Information System 1 CHAPTER ONE

  9. Modeling and planning distributed energy systems online

    NASA Astrophysics Data System (ADS)

    Wieler, Susana

    Sustainable energy is a core concern worldwide for the foreseeable future. Technologically, its key trends are distributed and renewable energy resources and smart grid capabilities. At the same time, a global need for sustainable energy is meeting increasingly diverse energy policy and economics. To plan with such complex contexts and systems, a novel distributed energy software tool and its initial implementation is presented: the Energy Systems Evaluator Online (ESEO). Its contributions include: (1) A flexible model framework that can simulate current and expected distributed energy systems; (2) An architecture specifying the modular design needed for distributed energy planning software in general; (3) A working implementation as the first general energy planning tool deployed via the Internet with collaborative capabilities.

  10. Tank waste remediation system engineering plan

    SciTech Connect

    Rifaey, S.H.

    1998-01-09

    This Engineering Plan describes the engineering process and controls that will be in place to support the Technical Baseline definition and manage its evolution and implementation to the field operations. This plan provides the vision for the engineering required to support the retrieval and disposal mission through Phase 1 and 2, which includes integrated data management of the Technical Baseline. Further, this plan describes the approach for moving from the ``as is`` condition of engineering practice, systems, and facilities to the desired ``to be`` configuration. To make this transition, Tank Waste Remediation System (TWRS) Engineering will become a center of excellence for TWRS which,will perform engineering in the most effective manner to meet the mission. TWRS engineering will process deviations from sitewide systems if necessary to meet the mission most effectively.

  11. Rock support system development test plan

    SciTech Connect

    Patricio, J.G. . Rockwell Hanford Operations)

    1984-03-30

    The Test Plan has been prepared to support design activities for the development of a rock support system for a Nuclear Waste Repository in Basalt (NWRB). The rock support system is assumed to consist of a combination of shotcrete and rock bolts. The seven testing activities include mix development and physical testing of shotcrete, durability testing of shotcrete, durability testing of rock bolt grouts, field tests on rock bolts, field testing of shotcrete, and heated room test. The objective of the Test Plan is to develop required data through combined laboratory, field, and office studies for design and design validation of the rock support system. The overall Test Plan is developed to provide a logical progression from laboratory tests performed to characterize fundamental thermomechanical properties of shotcrete and grouts, to field tests on rock bolts and shotcrete, and in situ performance tests. 21 refs., 15 figs., 33 tabs.

  12. Tank waste remediation system program plan

    SciTech Connect

    Powell, R.W.

    1998-01-09

    This TWRS Program plan presents the planning requirements and schedules and management strategies and policies for accomplishing the TWRS Project mission. It defines the systems and practices used to establish consistency for business practices, engineering, physical configuration and facility documentation, and to maintain this consistency throughout the program life cycle, particularly as changes are made. Specifically, this plan defines the following: Mission needs and requirements (what must be done and when must it be done); Technical objectives/approach (how well must it be done); Organizational structure and philosophy (roles, responsibilities, and interfaces); and Operational methods (objectives and how work is to be conducted in both management and technical areas). The plan focuses on the TWRS Retrieval and Disposal Mission and supports the DOE mid-1998 Readiness to Proceed with Privatized Waste Treatment evaluation for establishing contracts with private contractors for the treatment (immobilization) of Hanford tank high-level radioactive waste.

  13. [Planning orthodontic surgery with the Hexapod system].

    PubMed

    Vollmer, D; Ehmer, U; Bourauel, C; Linss, G

    2001-03-01

    Treatment of maxillofacial dysgnathia using a combined surgical/orthodontic approach requires careful orthodontic and orthognathic diagnosis and treatment planning. In the present study, a system enabling on-line presentation of the necessary displacements of the jaw during surgery, while improving the accuracy of the planning, is described. Using the hexapod principle, it is possible to plan operations with six degrees of freedom and to measure the three-dimensional movements of jaws and jaw segments within the planning stage. Routinely prepared casts are employed for simulation of the operation. The displacements of the jaw are presented in a manner familiar to the orthodontic surgeon, namely in a surgical record. The accuracy achieved with the hexapod is superior to that achievable intra-operatively.

  14. A strategic planning model for multihospital systems.

    PubMed

    Warner, M; Steinberg, J S; Brown, M

    1981-01-01

    Strategic planning and marketing for regional multihospital systems requires aids far greater in scope than those needed by single institutions. In the first place, planners for a regional system must be able to determine effects of its actions throughout the region, taking into account competitive interactions among a large number of institutions. This requires a much greater degree of sophistication than is usually found at the level of the single institution. Moreover, this greater sophistication cannot be bought at the expense of speed or demands on the time of the decisionmakers, nor can it be achieved through more sophisticated managerial skills. The aids must also be able to handle expeditiously a far larger volume of inquiry. Those two considerations shaped the design of the Multihospital Strategic Planning Model. Because of its comprehensiveness, the ease with which management can use it, and the speed with which it can answer a large volume of questions, it has become a permanent part of the ongoing corporate-level planning and marketing activities of the Maryland Health Care System in Baltimore. The planning staff can quickly analyze a wide variety of "What if?" questions by making selected changes--on an objective or a subjective basis--in the data files that represent the input variables of the system. By storing such changes in new data files, the staff can piggyback future "What if?" questions onto those asked in the past. The system includes on-line software to change data and create new files. Designed in an interactive mode, the system may be used by the planning staff, in the planning office, at any time.

  15. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1990-01-01

    An interactive graphical planning system for on-site planning of proximity operations in the congested multispacecraft environment about the space station is presented. The system shows the astronaut a bird's eye perspective of the space station, the orbital plane, and the co-orbiting spacecraft. The system operates in two operational modes: (1) a viewpoint mode, in which the astronaut is able to move the viewpoint around in the orbital plane to range in on areas of interest; and (2) a trajectory design mode, in which the trajectory is planned. Trajectory design involves the composition of a set of waypoints which result in a fuel-optimal trajectory which satisfies all operational constraints, such as departure and arrival constraints, plume impingement constraints, and structural constraints. The main purpose of the system is to present the trajectory and the constraints in an easily interpretable graphical format. Through a graphical interactive process, the trajectory waypoints are edited until all operational constraints are satisfied. A series of experiments was conducted to evaluate the system. Eight airline pilots with no prior background in orbital mechanics participated in the experiments. Subject training included a stand-alone training session of about 6 hours duration, in which the subjects became familiar with orbital mechanics concepts and performed a series of exercises to familiarize themselves with the control and display features of the system. They then carried out a series of production runs in which 90 different trajectory design situations were randomly addressed. The purpose of these experiments was to investigate how the planning time, planning efforts, and fuel expenditures were affected by the planning difficulty. Some results of these experiments are presented.

  16. NASDA knowledge-based network planning system

    NASA Technical Reports Server (NTRS)

    Yamaya, K.; Fujiwara, M.; Kosugi, S.; Yambe, M.; Ohmori, M.

    1993-01-01

    One of the SODS (space operation and data system) sub-systems, NP (network planning) was the first expert system used by NASDA (national space development agency of Japan) for tracking and control of satellite. The major responsibilities of the NP system are: first, the allocation of network and satellite control resources and, second, the generation of the network operation plan data (NOP) used in automated control of the stations and control center facilities. Up to now, the first task of network resource scheduling was done by network operators. NP system automatically generates schedules using its knowledge base, which contains information on satellite orbits, station availability, which computer is dedicated to which satellite, and how many stations must be available for a particular satellite pass or a certain time period. The NP system is introduced.

  17. System-Level Planning, Coordination, and Communication

    PubMed Central

    Kanter, Robert K.; Dries, David; Luyckx, Valerie; Lim, Matthew L.; Wilgis, John; Anderson, Michael R.; Sarani, Babak; Hupert, Nathaniel; Mutter, Ryan; Devereaux, Asha V.; Christian, Michael D.; Kissoon, Niranjan; Christian, Michael D.; Devereaux, Asha V.; Dichter, Jeffrey R.; Kissoon, Niranjan; Rubinson, Lewis; Amundson, Dennis; Anderson, Michael R.; Balk, Robert; Barfield, Wanda D.; Bartz, Martha; Benditt, Josh; Beninati, William; Berkowitz, Kenneth A.; Daugherty Biddison, Lee; Braner, Dana; Branson, Richard D; Burkle, Frederick M.; Cairns, Bruce A.; Carr, Brendan G.; Courtney, Brooke; DeDecker, Lisa D.; De Jong, Marla J.; Dominguez-Cherit, Guillermo; Dries, David; Einav, Sharon; Erstad, Brian L.; Etienne, Mill; Fagbuyi, Daniel B.; Fang, Ray; Feldman, Henry; Garzon, Hernando; Geiling, James; Gomersall, Charles D.; Grissom, Colin K.; Hanfling, Dan; Hick, John L.; Hodge, James G.; Hupert, Nathaniel; Ingbar, David; Kanter, Robert K.; King, Mary A.; Kuhnley, Robert N.; Lawler, James; Leung, Sharon; Levy, Deborah A.; Lim, Matthew L.; Livinski, Alicia; Luyckx, Valerie; Marcozzi, David; Medina, Justine; Miramontes, David A.; Mutter, Ryan; Niven, Alexander S.; Penn, Matthew S.; Pepe, Paul E.; Powell, Tia; Prezant, David; Reed, Mary Jane; Rich, Preston; Rodriquez, Dario; Roxland, Beth E.; Sarani, Babak; Shah, Umair A.; Skippen, Peter; Sprung, Charles L.; Subbarao, Italo; Talmor, Daniel; Toner, Eric S.; Tosh, Pritish K.; Upperman, Jeffrey S.; Uyeki, Timothy M.; Weireter, Leonard J.; West, T. Eoin; Wilgis, John; Ornelas, Joe; McBride, Deborah; Reid, David; Baez, Amado; Baldisseri, Marie; Blumenstock, James S.; Cooper, Art; Ellender, Tim; Helminiak, Clare; Jimenez, Edgar; Krug, Steve; Lamana, Joe; Masur, Henry; Mathivha, L. Rudo; Osterholm, Michael T.; Reynolds, H. Neal; Sandrock, Christian; Sprecher, Armand; Tillyard, Andrew; White, Douglas; Wise, Robert; Yeskey, Kevin

    2014-01-01

    BACKGROUND: System-level planning involves uniting hospitals and health systems, local/regional government agencies, emergency medical services, and other health-care entities involved in coordinating and enabling care in a major disaster. We reviewed the literature and sought expert opinions concerning system-level planning and engagement for mass critical care due to disasters or pandemics and offer suggestions for system-planning, coordination, communication, and response. The suggestions in this chapter are important for all of those involved in a pandemic or disaster with multiple critically ill or injured patients, including front-line clinicians, hospital administrators, and public health or government officials. METHODS: The American College of Chest Physicians (CHEST) consensus statement development process was followed in developing suggestions. Task Force members met in person to develop nine key questions believed to be most relevant for system-planning, coordination, and communication. A systematic literature review was then performed for relevant articles and documents, reports, and other publications reported since 1993. No studies of sufficient quality were identified upon which to make evidence-based recommendations. Therefore, the panel developed expert opinion-based suggestions using a modified Delphi process. RESULTS: Suggestions were developed and grouped according to the following thematic elements: (1) national government support of health-care coalitions/regional health authorities (HC/RHAs), (2) teamwork within HC/RHAs, (3) system-level communication, (4) system-level surge capacity and capability, (5) pediatric patients and special populations, (6) HC/RHAs and networks, (7) models of advanced regional care systems, and (8) the use of simulation for preparedness and planning. CONCLUSIONS: System-level planning is essential to provide care for large numbers of critically ill patients because of disaster or pandemic. It also entails a

  18. Vendor System Vulnerability Testing Test Plan

    SciTech Connect

    James R. Davidson

    2005-01-01

    The Idaho National Laboratory (INL) prepared this generic test plan to provide clients (vendors, end users, program sponsors, etc.) with a sense of the scope and depth of vulnerability testing performed at the INL’s Supervisory Control and Data Acquisition (SCADA) Test Bed and to serve as an example of such a plan. Although this test plan specifically addresses vulnerability testing of systems applied to the energy sector (electric/power transmission and distribution and oil and gas systems), it is generic enough to be applied to control systems used in other critical infrastructures such as the transportation sector, water/waste water sector, or hazardous chemical production facilities. The SCADA Test Bed is established at the INL as a testing environment to evaluate the security vulnerabilities of SCADA systems, energy management systems (EMS), and distributed control systems. It now supports multiple programs sponsored by the U.S. Department of Energy, the U.S. Department of Homeland Security, other government agencies, and private sector clients. This particular test plan applies to testing conducted on a SCADA/EMS provided by a vendor. Before performing detailed vulnerability testing of a SCADA/EMS, an as delivered baseline examination of the system is conducted, to establish a starting point for all-subsequent testing. The series of baseline tests document factory delivered defaults, system configuration, and potential configuration changes to aid in the development of a security plan for in depth vulnerability testing. The baseline test document is provided to the System Provider,a who evaluates the baseline report and provides recommendations to the system configuration to enhance the security profile of the baseline system. Vulnerability testing is then conducted at the SCADA Test Bed, which provides an in-depth security analysis of the Vendor’s system.b a. The term System Provider replaces the name of the company/organization providing the system

  19. Graphical interfaces for cooperative planning systems

    NASA Technical Reports Server (NTRS)

    Smith, Philip J.; Layton, Chuck; Mccoy, C. Elaine

    1990-01-01

    Based on a cognitive task analysis of 5 airline flight crews in a simulator study, researchers have designed a testbed for studying computer aids for en route flight path planning. This testbed runs on a Mac II controlling three color monitors, and is being used to study the design of aids for both dispatchers and flight crews. Specifically, the research focuses on design concepts for developing cooperative problem-solving systems. We use en route flight planning (selecting alternate routes or destinations due to unanticipated weather, traffic, malfunctions, etc.) as the context for studying the design of such systems. Researchers are currently exploring three questions in this test environment: (1) When interacting with a flight planning aid, how does the role of the pilot influence overall system performance; (2) Can the architecture for a cooperative planning system be built around Sacerdoti's (1983) concept of an abstraction hierarchy, where the pilot can interact with the system at many different levels of detail (but where the computer aid by default handles lower level details that the pilot has chosen not to deat with); and (3) Can graphical displays and direct manipulation of these displays provide perceptual enhancements (Larkin and Simon, 1987) of the pilot's problem-solving activities. Information is given in viewgraph form.

  20. NASA aerospace pyrotechnically actuated systems: Program plan

    NASA Technical Reports Server (NTRS)

    Schulze, Norman R.

    1992-01-01

    The NASA Aerospace Pyrotechnically Actuated Systems (PAS) Program, a focused technology program, is being initiated to enhance the reliability, safety, and performance of pyrotechnically actuated systems. In broad terms, this Program Plan presents the approach that helps to resolve concerns raised by the NASA/DOD/DOE Aerospace Pyrotechnic Steering Committee. This Plan reflects key efforts needed in PAS technology. The resources committed to implement the Program will be identified in the Program Implementation Plan (PIP). A top level schedule is included along with major Program milestones and products. Responsibilities are defined in the PIP. The Plan identifies the goals and detailed objectives which define how those goals are to be accomplished. The Program will improve NASA's capabilities to design, develop, manufacture, and test pyrotechnically actuated systems for NASA's programs. Program benefits include the following: advanced pyrotechnic systems technology developed for NASA programs; hands-on pyrotechnic systems expertise; quick response capability to investigate and resolve pyrotechnic problems; enhanced communications and intercenter support among the technical staff; and government-industry PAS technical interchange. The PAS Program produces useful products that are of a broad-based technology nature rather than activities intended to meet specific technology objectives for individual programs. Serious problems have occurred with pyrotechnic devices although near perfect performance is demanded by users. The lack of a program to address those problems in the past is considered a serious omission. The nature of problems experienced as revealed by a survey are discussed and the origin of the program is explained.

  1. Engine Performance (Section C: Emission Control Systems). Auto Mechanics Curriculum Guide. Module 3. Instructor's Guide.

    ERIC Educational Resources Information Center

    Rains, Larry

    This engine performance (emission control systems) module is one of a series of competency-based modules in the Missouri Auto Mechanics Curriculum Guide. Topics of this module's five units are: positive crankcase ventilation (PCV) and evaporative emission control systems; exhaust gas recirculation (EGR); air injection and catalytic converters;…

  2. Engine Performance (Section C: Emission Control Systems). Auto Mechanics Curriculum Guide. Module 3. Instructor's Guide.

    ERIC Educational Resources Information Center

    Rains, Larry

    This engine performance (emission control systems) module is one of a series of competency-based modules in the Missouri Auto Mechanics Curriculum Guide. Topics of this module's five units are: positive crankcase ventilation (PCV) and evaporative emission control systems; exhaust gas recirculation (EGR); air injection and catalytic converters;…

  3. The State University System 2025 System Strategic Plan. Revised

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System 2025 Strategic Plan strengthens the Board of Governors' commitment to achieving excellence in the tripartite mission of its state universities--teaching, research, and public service--for the benefit of Florida's citizens, their communities, and the state economy. The Strategic Plan is a living document that helps align…

  4. PLAN: Shared Automated Circulation System in California.

    ERIC Educational Resources Information Center

    Kershner, Lois

    1983-01-01

    Background information about Peninsula Library Automated Network member libraries and description of the circulation system of choice include basic components of this cooperative effort: Joint Powers Agreement and organizational structure; jurisdiction responsibilities and financial planning; database and policy areas requiring joint decision;…

  5. A Systemic Plan of Technology Integration

    ERIC Educational Resources Information Center

    Hsu, Pi-Sui; Sharma, Priya

    2006-01-01

    The purpose of this article is to suggest a research-based systemic plan for educational researchers, practitioners, and policymakers involved in the change process to implement successful technology integration in the context of teacher education. This article provides a background about reform efforts in science education in the United States in…

  6. Computer system failure: planning disaster recovery.

    PubMed

    Poker, A M

    1996-07-01

    A disaster recovery plan (DRP) defines the scope of restoration, establishes responsibilities and lists specific actions to be taken after the disaster. Although not actually involved in a DRP or computer systems, nurse managers must understand the steps involved and identify and communicate nursing's requirements.

  7. [Mechanized system for planning technological processes].

    PubMed

    Pashchenko, V S; Shapiro, A M

    1977-01-01

    A mechanized system for the production processes planning involving the use of an electronic code device for data preparation on a punched tape of the "EPECT-IT" type, at the base of which there are classifiers of standard operations and transitions to individual design members, is considered. A fragment of the classifier and a skeleton diagram of the system are presented. It is pointed out that the use of the system helps improve the quality of the design work, as well as to yield considerable economic advantages. The system is in operation at some enterprises of the medical engineering industry.

  8. A System Costs Planning Decision Support System

    DTIC Science & Technology

    1988-09-01

    York: Wiley and Sons, 1975, pp. 15-16. Lipsey , R. G., and Steiner, P. 0., Economics , New York: Harper and Row, 1969, ch. 11. Lloyd, C., Microeconomic...of the Highest Utility, an imposed spending ceiling, a minimum desired utility, or any possible combination of economic and/or political...Applica- tions," in M. Beckmann and H. P. Kunzi (eds.), Lecture Notes in Economics and Mathematical Systems, p. 208, Springer-Verlag, New York, 1981

  9. Comprehensive Plan, Report #5. Fort Lincoln New Town Education System.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    This is the final report of the General Learning Corporation's planning effort for the Fort Lincoln New Town school system. Designed as a "Comprehensive Plan", it summarizes the educational plans developed to date, and presents some new elements of planning while it serves to "tie together" all previous planning to provide the reader with a broad…

  10. Linking human and natural systems in the planning process

    Treesearch

    Susan I. Stewart; Miranda H. Mockrin; Roger B. Hammer

    2012-01-01

    Planning links human and natural systems in the urban-rural interface by engaging people in consideration of the future of natural resources. We review evolving ideas about what planning entails, who it involves, and what its outcomes should be. Sense of place, collaboration, emergent planning, and other new developments in planning are discussed. Smaller plans,...

  11. Improvements in patient treatment planning systems

    SciTech Connect

    Wheeler, F.J.; Wessol, D.E.; Nigg, D.W.; Atkinson, C.A.; Babcock, R.; Evans, J.

    1995-01-01

    The Boron Neutron Capture Therapy, Radiation treatment planning environment (BNCT-Rtpe) software system is used to develop treatment planning information. In typical use BNCT-Rtpe consists of three main components: (1) Semi-automated geometric modeling of objects (brain, target, eyes, sinus) derived from MRI, CT, and other medical imaging modalities, (2) Dose computations for these geometric models with rtt-MC, the INEL Monte Carlo radiation transport computer code, and (3) Dose contouring overlaid on medical images as well as generation of other dose displays. We continue to develop a planning system based on three-dimensional image-based reconstructions using Bspline surfaces. Even though this software is in an experimental state, it has been applied for large animal research and for an isolated case of treatment for a human glioma. Radiation transport is based on Monte Carlo, however there will be implementations of faster methods (e.g. diffusion theory) in the future. The important thing for treatment planning is the output which must convey, to the radiologist, the deposition of dose to healthy and target tissue. Many edits are available such that one can obtain contours registered to medical image, dose/volume histograms and most information required for treatment planning and response assessment. Recent work has been to make the process more automatic and easier to use. The interface, now implemented for contouring and reconstruction, utilizes the Xwindowing system and the MOTIF graphical users interface for effective interaction with the planner. Much work still remains before the tool can be applied in a routine clinical setting.

  12. Servicer system demonstration plan and capability development

    NASA Astrophysics Data System (ADS)

    1987-12-01

    An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

  13. Servicer system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    1987-01-01

    An orbital maneuvering vehicle (OMV) front end kit is defined which is capable of performing in-situ fluid resupply and modular maintenance of free flying spacecraft based on the integrated orbital servicing system (IOSS) concept. The compatibility of the IOSS to perform gas and fluid umbilical connect and disconnect functions utilizing connect systems currently available or in development is addressed. A series of tasks involving on-orbit servicing and the engineering test unit (ETU) of the on-orbit service were studied. The objective is the advancement of orbital servicing by expanding the Spacecraft Servicing Demonstration Plan (SSDP) to include detail demonstration planning using the Multimission Modular Spacecraft (MMS) and upgrading the ETU control.

  14. Systems effects on family planning innovativeness.

    PubMed

    Lee, S B

    1983-12-01

    Data from Korea were used to explore the importance of community level variables in explaining family planning adoption at the individual level. An open system concept was applied, assuming that individual family planning behavior is influenced by both environmental and individual factors. The environmental factors were measured at the village level and designated as community characteristics. The dimension of communication network variables was introduced. Each individual was characterized in terms of the degree of her involvement in family planning communication with others in her village. It was assumed that the nature of the communication network linking individuals with each other effects family planning adoption at the individual level. Specific objectives were to determine 1) the relative importance of the specific independent variables in explaining family planning adoption and 2) the relative importance of the community level variables in comparison with the individual level variables in explaining family planning adoption at the individual level. The data were originally gathered in a 1973 research project on Korea's mothers' clubs. 1047 respondents were interviewed, comprising all married women in 25 sample villages having mothers' clubs. The dependent variable was family planning adoption behavior, defined as current use of any of the modern methods of family planning. The independent variables were defined at 3 levels: individual, community, and at a level intermediate between them involving communication links between individuals. More of the individual level independent variables were significantly correlated with the dependent variables than the community level variables. Among those variables with statistically significant correlations, the correlation coefficients were consistently higher for the individual level than for the community level variables. More of the variance in the dependent variable was explained by individual level than by

  15. North Carolina Community College System Information Resources and Technology Plan.

    ERIC Educational Resources Information Center

    North Carolina Community Coll. System, Raleigh.

    The North Carolina Community College System engaged in a strategic planning process in 1998 that was the basis for the information resources and technology plans for the entire System. A focus of the planning was technology, and a technology environmental scanning team developed a set of planning assumptions, which led to the creation of 15 goals…

  16. Multiyear Program Plan for the High Temperature Materials Laboratory

    SciTech Connect

    Arvid E. Pasto

    2000-03-17

    Recently, the U.S. Department of Energy's (DOE) Office of Heavy Vehicle Technologies (OHVT) prepared a Technology Roadmap describing the challenges facing development of higher fuel efficiency, less polluting sport utility vehicles, vans, and commercial trucks. Based on this roadmap, a multiyear program plan (MYPP) was also developed, in which approaches to solving the numerous challenges are enumerated. Additional planning has been performed by DOE and national laboratory staff, on approaches to solving the numerous challenges faced by heavy vehicle system improvements. Workshops and planning documents have been developed concerning advanced aerodynamics, frictional and other parasitic losses, and thermal management. Similarly, the Heavy Vehicle Propulsion Materials Program has developed its own multiyear program plan. The High Temperature Materials Laboratory, a major user facility sponsored by OHVT, has now developed its program plan, described herein. Information was gathered via participation in the development of OHVT's overall Technology Roadmap and MYPP, through personal contacts within the materials-user community, and from attendance at conferences and expositions. Major materials issues for the heavy vehicle industry currently center on trying to increase efficiency of (diesel) engines while at the same time reducing emissions (particularly NO{sub x} and particulates). These requirements dictate the use of increasingly stronger, higher-temperature capable and more corrosion-resistant materials of construction, as well as advanced catalysts, particulate traps, and other pollution-control devices. Exhaust gas recirculation (EGR) is a technique which will certainly be applied to diesel engines in the near future, and its use represents a formidable challenge, as will be described later. Energy-efficient, low cost materials processing methods and surface treatments to improve wear, fracture, and corrosion resistance are also required.

  17. Planning for national health information system evaluation.

    PubMed

    Hyppönen, Hannele; Doupi, Persephone; Hämäläinen, Päivi; Komulainen, Jorma; Nykänen, Pirkko; Suomi, Reima

    2009-01-01

    Most EU member states have a documented policy on eHealth. Documented follow-up and evaluation policies to assess reaching of the set aims, as well as evaluating outcomes of implemented systems at a national level are, however, rare. Methodologies for large scale information system assessment and evaluation are poorly established. In the workshop, the Finnish evaluation plans for the National Health Information System (NHIS) are used as a case in the workshop to reflect on core issues and challenges in large-scale evaluation for supporting system development, implementation and positive impacts. The results of the discussions are documented to be used in further refinement of the Finnish evaluation methodology and for enhancing networking of respective parties in different countries. The results will also benefit participants including policy makers, developers and researchers of national eHealth systems in pursuit of national evaluation activities.

  18. OMEGA navigation system status and future plans

    NASA Technical Reports Server (NTRS)

    Nolan, T. P.; Scull, D. C.

    1974-01-01

    OMEGA is described as a very low frequency (VLF) radio navigational system operating in the internationally allocated navigation band in the electromagentic spectrum between 10 and 14 kilohertz. Full system implementation with worldwide coverage from eight transmitting stations is planned for the latter 1970's. Experimental stations have operated since 1966 in support of system evaluation and test. These stations provided coverage over most of the North Atlantic, North American Continent, and eastern portions of the North Pacific. This coverage provided the fundamental basis for further development of the system and has been essential to the demonstrated feasibility of the one to two nautical mile root-mean-square system accuracy. OMEGA is available to users in all nations, both on ships and in aircraft.

  19. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false System security plan: contents. 659.23 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at...

  20. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false System security plan: contents. 659.23 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at...

  1. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1988-01-01

    An interactive graphical proximity operations planning system was developed, which allows on-site design of efficient, complex, multiburn maneuvers in a dynamic multispacecraft environment. Maneuvering takes place in and out of the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of orbital dynamics and complex time-varying operational constraints. This difficulty is greatly overcome by visualizing the relative trajectories and the relevant constraints in an easily interpretable graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of a Space Station and co-orbiting spacecraft on the background of the Station's orbital plane. The operator has control over the two modes of operation: a viewing system mode, which enables the exporation of the spatial situation about the Space Station and thus the ability to choose and zoom in on areas of interest; and a trajectory design mode, which allows the interactive editing of a series of way points and maneuvering burns to obtain a trajectory that complies with all operational constraints. A first version of this display was completed. An experimental program is planned in which operators will carry out a series of design missions which vary in complexity and constraints.

  2. Strategic planning for power system restorations

    SciTech Connect

    Bent, Russell W; Van Hententyck, Pascal; Coffrin, Carleton

    2010-10-12

    This paper considers the power system restoration planning problem (PSRPP) for disaster recovery, a fundamental problem faced by all populated areas. PSRPPs are complex stochastic optimization problems that combine resource allocation, warehouse location, and vehicle routing considerations. Furthermore, electrical power systems are complex systems whose behavior can only be determined by physics simulations. Moreover, these problems must be solved under tight runtime constraints to be practical in real-world disaster situations. This work is three fold: (1) it formalizes the specification of PSRPPs; (2) introduces a simple optimization-simulation hybridization necessary for solving PSRPPs; and (3) presents a complete restoration algorithm that utilizes the strengths of mixed integer programming, constraint programming, and large neighborhood search. This paper studied a novel problem in the field of humanitarian logistics, the Power System Restoration Problem (PSRPP). The PSRPP models the strategic planning process for post disaster power system recovery. The paper proposed a multi-stage stochastic hybrid optimization algorithm that yields high quality solutions to real-world benchmarks provided by Los Alamos National Laboratory (LANL). The algorithm uses a variety of technologies, including MIP, constraint programming, and large neighborhood search, to exploit the structure of each individual optimization subproblem. The experimental results on hurricane disaster benchmarks indicate that the algorithm is practical from a computational standpoint and produce significant improvements over existing relief delivery procedures.

  3. Design of an advanced flight planning system

    NASA Technical Reports Server (NTRS)

    Sorensen, J. A.; Goka, T.

    1985-01-01

    The demand for both fuel conservation and four-dimensional traffic management require that the preflight planning process be designed to account for advances in airborne flight management and weather forecasting. The steps and issues in designing such an advanced flight planning system are presented. Focus is placed on the different optimization options for generating the three-dimensional reference path. For the cruise phase, one can use predefined jet routes, direct routes based on a network of evenly spaced grid points, or a network where the grid points are existing navaid locations. Each choice has its own problem in determining an optimum solution. Finding the reference path is further complicated by choice of cruise altitude levels, use of a time-varying weather field, and requiring a fixed time-of-arrival (four-dimensional problem).

  4. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  5. ECONOMIC DEVELOPMENT PLANNING AND INFORMATION SYSTEMS: A DISCUSSION AND BIBLIOGRAPHY,

    DTIC Science & Technology

    The first part of the report discusses the possible applications of computer based information systems in economics of development planning, with...planning, including some relevant literature in computer based modeling techniques and information systems . (Author)

  6. Guide to Developing an Environmental Management System - Plan

    EPA Pesticide Factsheets

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  7. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    SciTech Connect

    King, D.A.

    1994-11-10

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan.

  8. Radioisotope thermoelectric generator transportation system subsystem 143 software development plan

    NASA Astrophysics Data System (ADS)

    King, D. A.

    1994-11-01

    This plan describes the activities to be performed and the controls to be applied to the process of specifying, developing, and qualifying the data acquisition software for the Radioisotope Thermoelectric Generator (RTG) Transportation System Subsystem 143 Instrumentation and Data Acquisition System (IDAS). This plan will serve as a software quality assurance plan, a verification and validation (V and V) plan, and a configuration management plan.

  9. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum,...

  10. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum,...

  11. Tank waste remediation system systems engineering management plan

    SciTech Connect

    Peck, L.G.

    1996-02-06

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation Systems (TWRS) implementation of U.S. Department of Energy (DOE) Systems Engineering (SE) policy provided in Tank Waste Remediation System Systems Engineering Management Policy, DOE/RL letter, 95-RTI-107, Oct. 31, 1995. This SEMP defines the products, process, organization, and procedures used by the TWRS Program to accomplish SE objectives. This TWRS SEMP is applicable to all aspects of the TWRS Program and will be used as the basis for tailoring SE to apply necessary concepts and principles to develop and mature the processes and physical systems necessary to achieve the desired end states of the program.

  12. Effectiveness of a Case-Based System in Lesson Planning

    ERIC Educational Resources Information Center

    Saad, A.; Chung, P. W. H.; Dawson, C. W.

    2014-01-01

    Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…

  13. Effectiveness of a Case-Based System in Lesson Planning

    ERIC Educational Resources Information Center

    Saad, A.; Chung, P. W. H.; Dawson, C. W.

    2014-01-01

    Lesson planning imposes a significant burden on teachers as they need to prepare different lesson plans for different classes according to various constraints. SmartLP, a case-based lesson planning system, has been implemented as a means of assisting teachers in constructing quality lesson plans more quickly. SmartLP enables teachers to retrieve…

  14. Expert system for neurosurgical treatment planning

    NASA Astrophysics Data System (ADS)

    Cheng, Andrew Y. S.; Chung, Sally S. Y.; Kwok, John C. K.

    1996-04-01

    A specially designed expert system is in development for neurosurgical treatment planning. The knowledge base contains knowledge and experiences on neurosurgical treatment planning from neurosurgeon consultants, who also determine the risks of different regions in human brains. When completed, the system can simulate the decision making process of neurosurgeons to determine the safest probing path for operation. The Computed Tomography (CT) or Magnetic Resonance Imaging (MRI) scan images for each patient are grabbed as the input. The system also allows neurosurgeons to include for any particular patient the additional information, such as how the tumor affects its neighboring functional regions, which is also important for calculating the safest probing path. It can then consider all the relevant information and find the most suitable probing path on the patient's brain. A 3D brain model is constructed for each set of the CT/MRI scan images and is displayed real-time together with the possible probing paths found. The precise risk value of each path is shown as a number between 0 and 1, together with its possible damages in text. Neurosurgeons can view more than one possible path simultaneously, and make the final decision on the selected path for operation.

  15. Statistical modeling to support power system planning

    NASA Astrophysics Data System (ADS)

    Staid, Andrea

    This dissertation focuses on data-analytic approaches that improve our understanding of power system applications to promote better decision-making. It tackles issues of risk analysis, uncertainty management, resource estimation, and the impacts of climate change. Tools of data mining and statistical modeling are used to bring new insight to a variety of complex problems facing today's power system. The overarching goal of this research is to improve the understanding of the power system risk environment for improved operation, investment, and planning decisions. The first chapter introduces some challenges faced in planning for a sustainable power system. Chapter 2 analyzes the driving factors behind the disparity in wind energy investments among states with a goal of determining the impact that state-level policies have on incentivizing wind energy. Findings show that policy differences do not explain the disparities; physical and geographical factors are more important. Chapter 3 extends conventional wind forecasting to a risk-based focus of predicting maximum wind speeds, which are dangerous for offshore operations. Statistical models are presented that issue probabilistic predictions for the highest wind speed expected in a three-hour interval. These models achieve a high degree of accuracy and their use can improve safety and reliability in practice. Chapter 4 examines the challenges of wind power estimation for onshore wind farms. Several methods for wind power resource assessment are compared, and the weaknesses of the Jensen model are demonstrated. For two onshore farms, statistical models outperform other methods, even when very little information is known about the wind farm. Lastly, chapter 5 focuses on the power system more broadly in the context of the risks expected from tropical cyclones in a changing climate. Risks to U.S. power system infrastructure are simulated under different scenarios of tropical cyclone behavior that may result from climate

  16. Should health systems agencies be involved in environmental health planning?

    PubMed Central

    Higgins, C W; Philips, B U; Bruhn, J G; Aker, L T

    1980-01-01

    Public Law 93-641 provides health systems agencies (HSAs) with a broad planning preview which has enabled a number of agencies to address environmental health issues in their health systems plans. Opponents of HSA involvement in environmental health planning charge that these activities overextend agency resources, duplicate efforts of other government agencies and involve HSAs in "issues of public policy." Closer examination of these charges finds them lacking in validity. The planning activities of health systems agencies are cooperative in nature, drawing upon the planning efforts of other institutions and agencies. It is illogical to exclude environmental concerns from general health planning in light of the impact of the environment upon health. Charges that issues of public policy are inappropriate topics for health planning are seen as attempts to avoid scrutiny of inconsistant legislative policies. Cooperative planning between health systems agencies and environmental health agencies is considered both desirable and essential for the development of effective health planning. PMID:7428743

  17. Planning for the Global Earth Observation System of Systems (GEOSS)

    USGS Publications Warehouse

    Christian, E.

    2005-01-01

    The Group on Earth Observations was established to promote comprehensive, coordinated, and sustained Earth observations. Its mandate is to implement the Global Earth Observation System of Systems (GEOSS) in accord with the GEOSS 10-Year Implementation Plan and Reference Document. During the months over which the GEOSS Implementation Plan was developed, many issues surfaced and were addressed. This article discusses several of the more interesting or challenging of those issues-e.g. fitting in with existing organizations and securing stable funding - some of which have yet to be resolved fully as of this writing. Despite the relatively short period over which the Implementation Plan had to be developed, there is a good chance that the work undertaken will be influential for decades to come. ?? 2005 Elsevier Ltd. All rights reserved.

  18. Interactive orbital proximity operations planning system

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1989-01-01

    An interactive, graphical proximity operations planning system was developed which allows on-site design of efficient, complex, multiburn maneuvers in the dynamic multispacecraft environment about the space station. Maneuvering takes place in, as well as out of, the orbital plane. The difficulty in planning such missions results from the unusual and counterintuitive character of relative orbital motion trajectories and complex operational constraints, which are both time varying and highly dependent on the mission scenario. This difficulty is greatly overcome by visualizing the relative trajectories and the relative constraints in an easily interpretable, graphical format, which provides the operator with immediate feedback on design actions. The display shows a perspective bird's-eye view of the space station and co-orbiting spacecraft on the background of the station's orbital plane. The operator has control over two modes of operation: (1) a viewing system mode, which enables him or her to explore the spatial situation about the space station and thus choose and frame in on areas of interest; and (2) a trajectory design mode, which allows the interactive editing of a series of way-points and maneuvering burns to obtain a trajectory which complies with all operational constraints. Through a graphical interactive process, the operator will continue to modify the trajectory design until all operational constraints are met. The effectiveness of this display format in complex trajectory design is presently being evaluated in an ongoing experimental program.

  19. Human Frontal Lobes and AI Planning Systems

    NASA Technical Reports Server (NTRS)

    Levinson, Richard; Lum, Henry Jr. (Technical Monitor)

    1994-01-01

    Human frontal lobes are essential for maintaining a self-regulating balance between predictive and reactive behavior. This paper describes a system that integrates prediction and reaction based on neuropsychological theories of frontal lobe function. In addition to enhancing our understanding of deliberate action in humans' the model is being used to develop and evaluate the same properties in machines. First, the paper presents some background neuropsychology in order to set a general context. The role of frontal lobes is then presented by summarizing three theories which formed the basis for this work. The components of an artificial frontal lobe are then discussed from both neuropsychological and AI perspectives. The paper concludes by discussing issues and methods for evaluating systems that integrate planning and reaction.

  20. Human Frontal Lobes and AI Planning Systems

    NASA Technical Reports Server (NTRS)

    Levinson, Richard; Lum, Henry Jr. (Technical Monitor)

    1994-01-01

    Human frontal lobes are essential for maintaining a self-regulating balance between predictive and reactive behavior. This paper describes a system that integrates prediction and reaction based on neuropsychological theories of frontal lobe function. In addition to enhancing our understanding of deliberate action in humans' the model is being used to develop and evaluate the same properties in machines. First, the paper presents some background neuropsychology in order to set a general context. The role of frontal lobes is then presented by summarizing three theories which formed the basis for this work. The components of an artificial frontal lobe are then discussed from both neuropsychological and AI perspectives. The paper concludes by discussing issues and methods for evaluating systems that integrate planning and reaction.

  1. Astronomical Instrumentation Systems Quality Management Planning: AISQMP

    NASA Astrophysics Data System (ADS)

    Goldbaum, Jesse

    2017-06-01

    The capability of small aperture astronomical instrumentation systems (AIS) to make meaningful scientific contributions has never been better. The purpose of AIS quality management planning (AISQMP) is to ensure the quality of these contributions such that they are both valid and reliable. The first step involved with AISQMP is to specify objective quality measures not just for the AIS final product, but also for the instrumentation used in its production. The next step is to set up a process to track these measures and control for any unwanted variation. The final step is continual effort applied to reducing variation and obtaining measured values near optimal theoretical performance. This paper provides an overview of AISQMP while focusing on objective quality measures applied to astronomical imaging systems.

  2. Using a Systems Framework for Organizing Family Financial Planning.

    ERIC Educational Resources Information Center

    Edwards, Kay P.

    1988-01-01

    Systems concepts are applied to family financial planning using a functional interpretation of systems analyses. The framework can help professionals researching family financial behavior and its outcomes, planning programs, and offering financial services. It can also be used by families in their own financial planning. (Author/JOW)

  3. Board of Regents' Montana University System (MUS) Strategic Plan 2016

    ERIC Educational Resources Information Center

    Montana University System, 2016

    2016-01-01

    The Montana University System Strategic Plan is the primary planning document of the Board of Regents. The Plan sets forth an agenda for higher education in Montana by delineating the strategic directions, goals, and objectives that guide the Montana University System (MUS). In July 2006, after several years of study, public dialogue, and internal…

  4. Commercialization plan laser-based decoating systems

    SciTech Connect

    Freiwald, J.; Freiwald, D.A.

    1998-01-01

    F2 Associates Inc. (F2) is a small, high-technology firm focused on developing and commercializing environmentally friendly laser ablation systems for industrial-rate removal of surface coatings from metals, concrete, and delicate substrates such as composites. F2 has a contract with the US Department of Energy Federal Energy Technology Center (FETC) to develop and test a laser-based technology for removing contaminated paint and other contaminants from concrete and metal surfaces. Task 4.1 in Phase 2 of the Statement of Work for this DOE contract requires that F2 ``document its plans for commercializing and marketing the stationary laser ablation system. This document shall include a discussion of prospects for commercial customers and partners and may require periodic update to reflect changing strategy. This document shall be submitted to the DOE for review.`` This report is being prepared and submitted in fulfillment of that requirement. This report describes the laser-based technology for cleaning and coatings removal, the types of laser-based systems that have been developed by F2 based on this technology, and the various markets that are emerging for this technology. F2`s commercialization and marketing plans are described, including how F2`s organization is structured to meet the needs of technology commercialization, F2`s strategy and marketing approach, and the necessary steps to receive certification for removing paint from aircraft and DOE certification for D and D applications. The future use of the equipment built for the DOE contract is also discussed.

  5. Floor Plans Rolling Platform, Tech Systems Platform, and Load ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Floor Plans - Rolling Platform, Tech Systems Platform, and Load Platform Plans - Marshall Space Flight Center, F-1 Engine Static Test Stand, On Route 565 between Huntsville and Decatur, Huntsville, Madison County, AL

  6. Space telescope observatory management system preliminary test and verification plan

    NASA Technical Reports Server (NTRS)

    Fritz, J. S.; Kaldenbach, C. F.; Williams, W. B.

    1982-01-01

    The preliminary plan for the Space Telescope Observatory Management System Test and Verification (TAV) is provided. Methodology, test scenarios, test plans and procedure formats, schedules, and the TAV organization are included. Supporting information is provided.

  7. A treatment planning system for pleural PDT

    NASA Astrophysics Data System (ADS)

    Sandell, Julia; Chang, Chang; Finlay, Jarod C.; Zhu, Timothy C.

    2010-02-01

    Uniform light fluence distribution for patients undergoing photodynamic therapy (PDT) is critical to ensure predictable PDT outcome. However, common practice uses a point source to deliver light to the pleural cavity. To improve the uniformity of light fluence rate distribution, we have developed a treatment planning system using an infrared camera to track the movement of the point source. This study examines the light fluence (rate) delivered to chest phantom to simulate a patient undergoing pleural PDT. Fluence rate (mW/cm2) and cumulative fluence (J/cm2) was monitored at 7 different sites during the entire light treatment delivery. Isotropic detectors were used for in-vivo light dosimetry. Light fluence rate in the pleural cavity is also calculated using the diffusion approximation with a finite-element model. We have established a correlation between the light fluence rate distribution and the light fluence rate measured on the selected points based on a spherical cavity model. Integrating sphere theory is used to aid the calculation of light fluence rate on the surface of the sphere as well as inside tissue assuming uniform optical properties. The resulting treatment planning tool can be valuable as a clinical guideline for future pleural PDT treatment.

  8. Planning waste cooking oil collection systems.

    PubMed

    Ramos, Tânia Rodrigues Pereira; Gomes, Maria Isabel; Barbosa-Póvoa, Ana Paula

    2013-08-01

    This research has been motivated by a real-life problem of a waste cooking oil collection system characterized by the existence of multiple depots with an outsourced vehicle fleet, where the collection routes have to be plan. The routing problem addressed allows open routes between depots, i.e., all routes start at one depot but can end at the same or at a different one, depending on what minimizes the objective function considered. Such problem is referred as a Multi-Depot Vehicle Routing Problem with Mixed Closed and Open Inter-Depot Routes and is, in this paper, modeled through a mixed integer linear programming (MILP) formulation where capacity and duration constraints are taken into account. The model developed is applied to the real case study providing, as final results, the vehicle routes planning where a decrease of 13% on mileage and 11% on fleet hiring cost are achieved, when comparing with the current company solution. Copyright © 2013 Elsevier Ltd. All rights reserved.

  9. Business System Planning Project, Alternatives Analysis

    SciTech Connect

    EVOSEVICH, S.

    2000-10-30

    The CHG Chief Information Officer (CIO) requested a study of alternatives to the current business system computing environment. This Business Systems Planning (BSP) Project Alternatives Analysis document presents an analysis of the current Project Controls, Work Management, and Business Management systems environment and alternative solutions that support the business functions. The project team has collected requirements and priorities from stakeholders in each business area and documented them in the BSP System Requirements Specification (SRS), RPP-6297. The alternatives analysis process identifies and measures possible solutions in each of the business process areas against the requirements as documented in the SRS. The team gathered input from both internal and external sources to identify and grade the possible solutions. This document captures the results of that activity and recommends a suite of software products. This study was to select the best product based on how well the product met the requirements, not to determine the platform or hardware environment that would be used. Additional analysis documentation can be found in BSP project files.

  10. Guidelines for Analysis of Pharmaceutical Supply System Planning in Developing Countries. Volume 7: Pharmaceutical Supply System Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Schaumann, Leif; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this seventh of ten manuals in the Interational Health Planning Methods Series deals with pharmaceutical supply systems planning in developing countries. Following an…

  11. Guidelines for Analysis of Pharmaceutical Supply System Planning in Developing Countries. Volume 7: Pharmaceutical Supply System Planning. International Health Planning Methods Series.

    ERIC Educational Resources Information Center

    Schaumann, Leif; And Others

    Intended to assist Agency for International Development (AID) officers, advisors, and health officials in incorporating health planning into national plans for economic development, this seventh of ten manuals in the Interational Health Planning Methods Series deals with pharmaceutical supply systems planning in developing countries. Following an…

  12. Planning for mARC treatments with the Eclipse treatment planning system.

    PubMed

    Sarkar, Vikren; Huang, Long; Rassiah-Szegedi, Prema; Zhao, Hui; Huang, Jessica; Szegedi, Martin; Salter, Bill J

    2015-03-08

    While modulated arc (mARC) capabilities have been available on Siemens linear accelerators for almost two years now, there was, until recently, only one treatment planning system capable of planning these treatments. The Eclipse treatment planning system now offers a module that can plan for mARC treatments. The purpose of this work was to test the module to determine whether it is capable of creating clinically acceptable plans. A total of 23 plans were created for various clinical sites and all plans delivered without anomaly. The average 3%/3 mm gamma pass rate for the plans was 98.0%, with a standard deviation of 1.7%. For a total of 14 plans, an equivalent static gantry IMRT plan was also created to compare delivery time. In all but two cases, the mARC plans delivered significantly faster than the static gantry plan. We have confirmed the successful creation of mARC plans that are deliverable with high fidelity on an ARTISTE linear accelerator, thus demonstrating the successful implementation of the Eclipse mARC module.

  13. New Paradigm of Power System Planning under Competitive Environment

    NASA Astrophysics Data System (ADS)

    Mori, Hiroyuki

    This paper presents a new paradigm of power system planning under competitive environment. As the liberalization of power systems become more competitive, power systems are faced with new aspects that the conventional bundled power company has never encountered. The conventional power system planning methods do not match the requirements of competitive environment. In practice, the power system liberalization brings about new environment that puts emphasis on the profit maximization and the risk minimization. Thus, the problem formulation of power system planning should be reformulated to reflect the new aspects in power systems. As the tasks of power system planning, this paper outlines transmission network expansion planning, distribution network expansion planning, and unit commitment under competitive environment. In addition, new tasks such as very short-term load forecasting, electricity price forecasting, and wind power forecasting are described.

  14. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  15. Planning and Design: A Systems Approach.

    ERIC Educational Resources Information Center

    Bozeman, William C.; Clements, Mary A.

    1981-01-01

    Explains "purpose design," a planning and problem-solving strategy involving determination of planning purposes, generation and selection of solutions, specification of solution details, implementation, and evaluation. Describes the application of purpose design to the planning of an alumni association at Black Hawk College, a community…

  16. Tank waste remediation system systems engineering management plan

    SciTech Connect

    Peck, L.G.

    1998-01-08

    This Systems Engineering Management Plan (SEMP) describes the Tank Waste Remediation System (TWRS) implementation of the US Department of Energy (DOE) systems engineering policy provided in 97-IMSD-193. The SEMP defines the products, process, organization, and procedures used by the TWRS Project to implement the policy. The SEMP will be used as the basis for tailoring the systems engineering applications to the development of the physical systems and processes necessary to achieve the desired end states of the program. It is a living document that will be revised as necessary to reflect changes in systems engineering guidance as the program evolves. The US Department of Energy-Headquarters has issued program management guidance, DOE Order 430. 1, Life Cycle Asset Management, and associated Good Practice Guides that include substantial systems engineering guidance.

  17. PlanWorks: A Debugging Environment for Constraint Based Planning Systems

    NASA Technical Reports Server (NTRS)

    Daley, Patrick; Frank, Jeremy; Iatauro, Michael; McGann, Conor; Taylor, Will

    2005-01-01

    Numerous planning and scheduling systems employ underlying constraint reasoning systems. Debugging such systems involves the search for errors in model rules, constraint reasoning algorithms, search heuristics, and the problem instance (initial state and goals). In order to effectively find such problems, users must see why each state or action is in a plan by tracking causal chains back to part of the initial problem instance. They must be able to visualize complex relationships among many different entities and distinguish between those entities easily. For example, a variable can be in the scope of several constraints, as well as part of a state or activity in a plan; the activity can arise as a consequence of another activity and a model rule. Finally, they must be able to track each logical inference made during planning. We have developed PlanWorks, a comprehensive system for debugging constraint-based planning and scheduling systems. PlanWorks assumes a strong transaction model of the entire planning process, including adding and removing parts of the constraint network, variable assignment, and constraint propagation. A planner logs all transactions to a relational database that is tailored to support queries for of specialized views to display different forms of data (e.g. constraints, activities, resources, and causal links). PlanWorks was specifically developed for the Extensible Universal Remote Operations Planning Architecture (EUROPA(sub 2)) developed at NASA, but the underlying principles behind PlanWorks make it useful for many constraint-based planning systems. The paper is organized as follows. We first describe some fundamentals of EUROPA(sub 2). We then describe PlanWorks' principal components. We then discuss each component in detail, and then describe inter-component navigation features. We close with a discussion of how PlanWorks is used to find model flaws.

  18. Legacy system retirement plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    documentation baseline rather than to ensure the ability to reestablish an operational production system. The remainder of this document describes the planning for the removal of the identified systems from service at Hanford, The retirement requirements, planning schedules and costs are covered in the body of the document.

  19. System integration test plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-24

    This document presents the system integration test plan for the Commercial-Off-The-Shelf, PassPort and PeopleSoft software, and custom software created to work with the COTS products. The PP software is an integrated application for AP, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheet. The PS software is an integrated application for Project Costing, General Ledger, Human Resources/Training, Payroll, and Base Benefits.

  20. Master Plan for the Virginia Community College System Computing Services.

    ERIC Educational Resources Information Center

    Virginia State Dept. of Community Colleges, Richmond.

    This master plan sets forth a general strategy for providing administrative and academic computing services and satisfying the data processing requirements for the Virginia Community College System (VCCS) during the 1980's. Following an executive summary, chapter 1 sets forth the purpose of the plan and outlines the planning processes used.…

  1. 78 FR 13316 - National Forest System Land Management Planning Directives

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-27

    ... Forest Service RIN 0596-AD06 National Forest System Land Management Planning Directives AGENCY: Forest...) land management planning regulation. Issuance of these proposed directives will provide consistent... land management plans for units of the NFS. Public comment is invited and will be considered in...

  2. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Forest Service 36 CFR Part 219 RIN 0596-AB86 National Forest System Land Management Planning; Correction...) published a final rule setting forth directions for developing, amending, revising, and monitoring land...) requires planning regulations to specify guidelines for land management plans which ``permit increases in...

  3. Planning and Evaluating Library System Services in Illinois.

    ERIC Educational Resources Information Center

    Michael, Mary Ellen; Young, Arthur P.

    This manual was conceived as a reference guide for Illinois' 18 library systems to use in their long-range planning and evaluation program. Section 1 of the manual explains the planning model: Context Input Process Product (CIPP). CIPP was selected as a coherent adaptation and modification of many previous planning and design methods: systems…

  4. M.A.P.S.: Mesa Action Planning System.

    ERIC Educational Resources Information Center

    Larson, Elizabeth J. Hunt

    This report describes implementation of a districtwide planning model in the Mesa, Arizona, Public Schools. Figures illustrate planning processes throughout the report. Intended as an implementive framework, the planning system's purposes are to assist decision making about resource allocation, program direction, progress measurement, and district…

  5. Intelligent control of a planning system for astronaut training.

    PubMed

    Ortiz, J; Chen, G

    1999-07-01

    This work intends to design, analyze and solve, from the systems control perspective, a complex, dynamic, and multiconstrained planning system for generating training plans for crew members of the NASA-led International Space Station. Various intelligent planning systems have been developed within the framework of artificial intelligence. These planning systems generally lack a rigorous mathematical formalism to allow a reliable and flexible methodology for their design, modeling, and performance analysis in a dynamical, time-critical, and multiconstrained environment. Formulating the planning problem in the domain of discrete-event systems under a unified framework such that it can be modeled, designed, and analyzed as a control system will provide a self-contained theory for such planning systems. This will also provide a means to certify various planning systems for operations in the dynamical and complex environments in space. The work presented here completes the design, development, and analysis of an intricate, large-scale, and representative mathematical formulation for intelligent control of a real planning system for Space Station crew training. This planning system has been tested and used at NASA-Johnson Space Center.

  6. 77 FR 21161 - National Forest System Land Management Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ...The U.S. Department of Agriculture is adopting a new National Forest System land management planning rule (planning rule). The new planning rule guides the development, amendment, and revision of land management plans for all units of the National Forest System (NFS), consisting of 155 national forests, 20 grasslands, and 1 prairie. This planning rule sets forth process and content requirements to guide the development, amendment, and revision of land management plans to maintain and restore NFS land and water ecosystems while providing for ecosystem services and multiple uses. The planning rule is designed to ensure that plans provide for the sustainability of ecosystems and resources; meet the need for forest restoration and conservation, watershed protection, and species diversity and conservation; and assist the Agency in providing a sustainable flow of benefits, services, and uses of NFS lands that provide jobs and contribute to the economic and social sustainability of communities.

  7. W-320, waste retrieval sluicing system: Operational start up plan

    SciTech Connect

    Bevins, R.R.

    1998-07-25

    This plan details the sequence of activities and identifies the organizational roles and responsibilities to ensure a safe startup of the Waste Retrieval Sluicing System (WRSS). This start up plan identifies the activities which must be performed during the initial startup as well as the document which directs each step. This startup plan does not authorize or direct any specific field activities or authorize a change of configuration. As such, this plan does not require a USQ screening.

  8. Tourism and recreation system planning in Alberta provincial parks

    Treesearch

    Paul F.J. Eagles; Angela M. Gilmore; Luis X. Huang; Denise A. Keltie; Kimberley Rae; Hong Sun; Amy K. Thede; Meagan L. Wilson; Jennifer A. Woronuk; Ge Yujin

    2007-01-01

    Traditionally, system planning in parks and protected areas concentrated on biogeographical concepts, while neglecting tourism and recreation. The existing system plan for parks and protected areas in Alberta, Canada, divides the province into six natural regions based on a geographic classifi cation system (Grassland, Parkland, Foothills, Rocky Mountains, Boreal...

  9. State and Community Planning for Early Childhood Systems.

    ERIC Educational Resources Information Center

    Galinsky, Ellen; And Others

    1994-01-01

    Describes eight components of planning initiatives for improving the quality and delivery of early childhood education: (1) creating linkages; (2) using data in planning; (3) improving program quality; (4) developing a coordinated professional development system; (5) financing the system; (6) creating new systems of governance; (7) building public…

  10. Planning Programming Budgeting Systems: PPBS and Education.

    ERIC Educational Resources Information Center

    Katzenbach, Edward L.

    Continuous change in education is requiring educational administrators to plan for the distant future with as much precision as they now do for the immediate future. Recently, major advances in the planning-budgeting process have become available to educators in the form of PPBS. Fiduciary budgets, which have been used in most schools since the…

  11. The Hawaii Educational Dissemination Diffusion System Plan.

    ERIC Educational Resources Information Center

    Min, Kellet; And Others

    Hawaii's endeavor to use information technology to improve educational practices within the state is described in four major sections: (1) the framework of the plan, including a brief history of dissemination, the goals of the plan, and philosophic statements on resources, linkages, and leadership; (2) the resource component, including an…

  12. Air quality and future energy system planning

    NASA Astrophysics Data System (ADS)

    Sobral Mourao, Zenaida; Konadu, Dennis; Lupton, Rick

    2016-04-01

    energy system planning. Some example applications of this work are: (1) to discover conflicts and synergies between air quality regulations and future developments in the energy system and land use change; (2) to show the drivers of air quality in a given spatial context; (3) to explore effective ways to visualize impacts of different energy, land use and emissions control policies on air quality. An initial test case for the Bay Area in California will be presented, extending the scope of the existing California ForeseerTM tool to identify impacts of different policies within the water-energy-land nexus on local air quality.

  13. Geographic information system based manure application plan.

    PubMed

    Basnet, Badri B; Apan, Armando A; Raine, Steven R

    2002-02-01

    A geographic information system (GIS) based manure application plan has been developed for the site-specific application of animal waste to agricultural fields in the Westbrook sub-catchment of the Murray-Darling Basin, south-east Queensland, Australia. Sites suitable for animal waste application were identified using a GIS based weighted linear combination (WLC) model. The degree of land suitability for animal waste application was determined using a range of social, economic, environmental, and agricultural factors. As eutrophication and toxic blue-green algae blooms are a known problem in the catchment, the manure application rates were limited to the rate of crop phosphorus removal. Maximum manure application rate was calculated spatially by taking the crop nutrient (P2O5) requirement and the manure nutrient (P2O5) content into account. The environmental suitability of the fields receiving animal waste was considered in prescribing the final application rate of solid and liquid manures generated by local animal production facilities. The degree of site suitability of the agricultural fields was also used to suggest manure management practices to minimise the socio-environmental risks and increase the nutrient use efficiency of the applied manure. The amount of ammonium nitrogen (NH4-N) that would be added to the soil by satisfying the P2O5 requirement using manure sources was also calculated and an applied NH4-N map was created. This map could be used to assist farmers identify additional nitrogen requirements after manure application.

  14. A Plan for the Development and Implementation of Planning, Programming, Budgeting and Evaluation System, and Management Information System.

    ERIC Educational Resources Information Center

    Wesolowski, Zdzislaw P.

    The implementation of a Planning, Budgeting and Evaluation System (PPBES) and a Management Information System (MIS) at Polk Community College will consider the needs, the objectives, and the priorities of the college. The tasks in the development and implementation of a PPBS system are: development of an implementation plan (specific tasks…

  15. Virginia Community College System Master Plan, 1982-1990.

    ERIC Educational Resources Information Center

    Virginia State Dept. of Community Colleges, Richmond.

    The Virginia Community College System (VCCS) master plan presented in this report is designed to manage the system and its 23 comprehensive community colleges during the years 1982 through 1990. First, chapter I presents an executive summary of the plan, the process of its implementation, and recommendations for policy changes in key areas.…

  16. Information security management system planning for CBRN facilities

    SciTech Connect

    Lenaeu, Joseph D.; O'Neil, Lori Ross; Leitch, Rosalyn M.; Glantz, Clifford S.; Landine, Guy P.; Bryant, Janet L.; Lewis, John; Mathers, Gemma; Rodger, Robert; Johnson, Christopher

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  17. 7 CFR 12.23 - Conservation plans and conservation systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 1 2014-01-01 2014-01-01 false Conservation plans and conservation systems. 12.23 Section 12.23 Agriculture Office of the Secretary of Agriculture HIGHLY ERODIBLE LAND AND WETLAND CONSERVATION Highly Erodible Land Conservation § 12.23 Conservation plans and conservation systems. (a) Use of...

  18. 7 CFR 12.23 - Conservation plans and conservation systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Conservation plans and conservation systems. 12.23 Section 12.23 Agriculture Office of the Secretary of Agriculture HIGHLY ERODIBLE LAND AND WETLAND CONSERVATION Highly Erodible Land Conservation § 12.23 Conservation plans and conservation systems. (a) Use of...

  19. 7 CFR 12.23 - Conservation plans and conservation systems.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Conservation plans and conservation systems. 12.23 Section 12.23 Agriculture Office of the Secretary of Agriculture HIGHLY ERODIBLE LAND AND WETLAND CONSERVATION Highly Erodible Land Conservation § 12.23 Conservation plans and conservation systems. (a) Use of...

  20. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  1. Succession Planning in a Two-Year Technical College System

    ERIC Educational Resources Information Center

    Neefe, Diane Osterhaus

    2009-01-01

    The study explores the organizational characteristics of strategic planning, succession planning and career management and the processes impact on the hiring location of academic leaders from within the college, external to the college but within the system, and external to the system. The study was conducted in the 16 college Wisconsin…

  2. Servicers system demonstration plan and capability development

    NASA Technical Reports Server (NTRS)

    Bulboaca, M. A.; Cuseo, J. A.; Derocher, W. L., Jr.; Maples, R. W.; Reynolds, P. C.; Sterrett, R. A.

    1985-01-01

    A plan for the demonstration of the exchange of Multi-Mission Modular Spacecraft (MMS) modules using the servicer mechanism Engineering Test Unit (ETU) was prepared and executed. The plan included: establishment of requirements, conceptual design, selection of MMS spacecraft mockup configuration, selection of MMS module mockup configuration, evaluation of adequacy of ETU load capability, and selection of a stowage rack arrangement. The MMS module exchange demonstration mockup equipment was designed, fabricated, checked out, shipped, installed, and demonstrated.

  3. Dosimetry audit of radiotherapy treatment planning systems.

    PubMed

    Bulski, Wojciech; Chełmiński, Krzysztof; Rostkowska, Joanna

    2015-07-01

    In radiotherapy Treatment Planning Systems (TPS) various calculation algorithms are used. The accuracy of dose calculations has to be verified. Numerous phantom types, detectors and measurement methodologies are proposed to verify the TPS calculations with dosimetric measurements. A heterogeneous slab phantom has been designed within a Coordinated Research Project (CRP) of the IAEA. The heterogeneous phantom was developed in the frame of the IAEA CRP. The phantom consists of frame slabs made with polystyrene and exchangeable inhomogeneity slabs equivalent to bone or lung tissue. Special inserts allow to position thermoluminescent dosimeters (TLD) capsules within the polystyrene slabs below the bone or lung equivalent slabs and also within the lung equivalent material. Additionally, there are inserts that allow to position films or ionisation chamber in the phantom. Ten Polish radiotherapy centres (of 30 in total) were audited during on-site visits. Six different TPSs and five calculation algorithms were examined in the presence of inhomogeneities. Generally, most of the results from TLD were within 5 % tolerance. Differences between doses calculated by TPSs and measured with TLD did not exceed 4 % for bone and polystyrene equivalent materials. Under the lung equivalent material, on the beam axis the differences were lower than 5 %, whereas inside the lung equivalent material, off the beam axis, in some cases they were of around 7 %. The TLD results were confirmed with the ionisation chamber measurements. The comparison results of the calculations and the measurements allow to detect limitations of TPS calculation algorithms. The audits performed with the use of heterogeneous phantom and TLD seem to be an effective tool for detecting the limitations in the TPS performance or beam configuration errors at audited radiotherapy departments.

  4. Software Configuration Management Plan for the Sodium Removal System

    SciTech Connect

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  5. Systems Engineering Simulator (SES) Simulator Planning Guide

    NASA Technical Reports Server (NTRS)

    McFarlane, Michael

    2011-01-01

    The simulation process, milestones and inputs are unknowns to first-time users of the SES. The Simulator Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their engineering personnel in simulation planning and execution. Material covered includes a roadmap of the simulation process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, facility interfaces, and inputs necessary to define scope, cost, and schedule are included as an appendix to the guide.

  6. An artificial intelligence system for computer-assisted menu planning.

    PubMed

    Petot, G J; Marling, C; Sterling, L

    1998-09-01

    Planning nutritious and appetizing menus is a complex task that researchers have tried to computerize since the early 1960s. We have attempted to facilitate computer-assisted menu planning by modeling the reasoning an expert dietitian uses to plan menus. Two independent expert systems were built, each designed to plan a daily menu meeting the nutrition needs and personal preferences of an individual client. One system modeled rule-based, or logical, reasoning, whereas the other modeled case-based, or experiential, reasoning. The 2 systems were evaluated and their strengths and weaknesses identified. A hybrid system was built, combining the best of both systems. The hybrid system represents an important step forward because it plans daily menus in accordance with a person's needs and preferences; the Reference Daily Intakes; the Dietary Guidelines for Americans; and accepted aesthetic standards for color, texture, temperature, taste, and variety. Additional work to expand the system's scope and to enhance the user interface will be needed to make it a practical tool. Our system framework could be applied to special-purpose menu planning for patients in medical settings or adapted for institutional use. We conclude that an artificial intelligence approach has practical use for computer-assisted menu planning.

  7. 2016 System Summary of University Work Plans. Revised

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2016

    2016-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future: (1) The Board of Governors' 2025 System Strategic Plan is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is progressing…

  8. MINERVA - A Multi-Modal Radiation Treatment Planning System

    SciTech Connect

    D. E. Wessol; C. A. Wemple; D. W. Nigg; J. J. Cogliati; M. L. Milvich; C. Frederickson; M. Perkins; G. A. Harkin

    2004-10-01

    Recently, research efforts have begun to examine the combination of BNCT with external beam photon radiotherapy (Barth et al. 2004). In order to properly prepare treatment plans for patients being treated with combinations of radiation modalities, appropriate planning tools must be available. To facilitiate this, researchers at the Idaho National Engineering and Environmental Laboratory (INEEL)and Montana State University (MSU) have undertaken development of a fully multi-modal radiation treatment planning system.

  9. Picture archiving and communication systems planning: a methodology.

    PubMed

    Unkel, P J; Shelton, P D; Inamdar, R

    1999-08-01

    This article presents the Picture Archiving and Communication Systems (PACS) planning methodology used by the Department of Defense's (DOD) Joint Imaging Technology Project Office (JITPO). This methodology evaluates four areas of PACS planning and implementation: strategic planning, clinical scenario planning, installation planning, and implementation planning. The first task is to develop a PACS team, from the local facility, that will execute the program. A written PACS plan is developed by the JITPO, with active input and final say from the site's PACS team. This plan includes the PACS goals and objectives, clinical requirements, facility requirements, and the status of the implementation. This methodology, when applied fully at a military clinical site, has resulted in the site obtaining best "value" in terms of cost and performance by requiring the DOD's contracted PACS vendors to propose a PACS package that meets or exceeds the site's unique requirements. The identification of the requirements and the matching of a known PACS configuration with them has reduced the number of unknowns within the vendors' proposals and created true competition in both initial cost and the cost to maintain PACS in the maintenance years. Although there are certain factors unique to planning a military PACS, such as preselected vendors, the planning methodology described in this article should provide a valuable strategy for any hospital planning a PACS.

  10. Planning for Online Education: A Systems Model

    ERIC Educational Resources Information Center

    Picciano, Anthony G.

    2015-01-01

    The purpose of this article is to revisit the basic principles of technology planning as applied to online education initiatives. While not meant to be an exhaustive treatment of the topic, the article is timely because many colleges and universities are considering the development and expansion of online education as part of their planning…

  11. 183 KE Potable water system analysis plan

    SciTech Connect

    Hunacek, G.S.

    1995-09-27

    Sampling analysis plans (SAP) are a recognized manner of providing applicable requirements for conducting media sampling and analysis in a manner consistent with prescirbed objectives. This SAP has been prepared to satisfy the data quality objectives listed in this SAP with respect to the operation of the 183 KE potable water for K Area.

  12. SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

    SciTech Connect

    CRAWFORD TW; CERTA PJ; WELLS MN

    2010-01-14

    At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

  13. Development of an expert planning system for OSSA

    NASA Technical Reports Server (NTRS)

    Groundwater, B.; Lembeck, M. F.; Sarsfield, L.; Diaz, Alphonso

    1988-01-01

    This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

  14. Development of an expert planning system for OSSA

    NASA Technical Reports Server (NTRS)

    Groundwater, B.; Lembeck, M. F.; Sarsfield, L.; Diaz, Alphonso

    1988-01-01

    This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

  15. A mission planning concept and mission planning system for future manned space missions

    NASA Technical Reports Server (NTRS)

    Wickler, Martin

    1994-01-01

    The international character of future manned space missions will compel the involvement of several international space agencies in mission planning tasks. Additionally, the community of users requires a higher degree of freedom for experiment planning. Both of these problems can be solved by a decentralized mission planning concept using the so-called 'envelope method,' by which resources are allocated to users by distributing resource profiles ('envelopes') which define resource availabilities at specified times. The users are essentially free to plan their activities independently of each other, provided that they stay within their envelopes. The new developments were aimed at refining the existing vague envelope concept into a practical method for decentralized planning. Selected critical functions were exercised by planning an example, founded on experience acquired by the MSCC during the Spacelab missions D-1 and D-2. The main activity regarding future mission planning tasks was to improve the existing MSCC mission planning system, using new techniques. An electronic interface was developed to collect all formalized user inputs more effectively, along with an 'envelope generator' for generation and manipulation of the resource envelopes. The existing scheduler and its data base were successfully replaced by an artificial intelligence scheduler. This scheduler is not only capable of handling resource envelopes, but also uses a new technology based on neuronal networks. Therefore, it is very well suited to solve the future scheduling problems more efficiently. This prototype mission planning system was used to gain new practical experience with decentralized mission planning, using the envelope method. In future steps, software tools will be optimized, and all data management planning activities will be embedded into the scheduler.

  16. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas.

    PubMed

    Chang, Hsien-Tsung; Chang, Yi-Ming; Tsai, Meng-Tze

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning.

  17. NASA's Radioisotope Power Systems Planning and Potential Future Systems Overview

    NASA Technical Reports Server (NTRS)

    Zakrajsek, June F.; Woerner, Dave F.; Cairns-Gallimore, Dirk; Johnson, Stephen G.; Qualls, Louis

    2016-01-01

    The goal of NASA's Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), assesses the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Program's budgetary needs, and disseminates current information about RPS to the community of potential users. This process has been refined and used to determine the current content of the RPS Program's portfolio. This portfolio currently includes an effort to mature advanced thermoelectric technology for possible integration into an enhanced Multi-Mission Radioisotope Generator (eMMRTG), sustainment and production of the currently deployed MMRTG, and technology investments that could lead to a future Stirling Radioisotope Generator (SRG). This paper describes the program planning processes that have been used, the currently available MMRTG, and one of the potential future systems, the eMMRTG.

  18. NASA's Radioisotope Power Systems Planning and Potential Future Systems Overview

    NASA Technical Reports Server (NTRS)

    Zakrajsek, June F.; Woerner, Dave F.; Cairns-Gallimore, Dirk; Johnson, Stephen G.; Qualis, Louis

    2016-01-01

    The goal of NASA's Radioisotope Power Systems (RPS) Program is to make RPS ready and available to support the exploration of the solar system in environments where the use of conventional solar or chemical power generation is impractical or impossible to meet the needs of the missions. To meet this goal, the RPS Program, working closely with the Department of Energy, performs mission and system studies (such as the recently released Nuclear Power Assessment Study), assesses the readiness of promising technologies to infuse in future generators, assesses the sustainment of key RPS capabilities and knowledge, forecasts and tracks the Programs budgetary needs, and disseminates current information about RPS to the community of potential users. This process has been refined and used to determine the current content of the RPS Programs portfolio. This portfolio currently includes an effort to mature advanced thermoelectric technology for possible integration into an enhanced Multi-Mission Radioisotope Generator (eMMRTG), sustainment and production of the currently deployed MMRTG, and technology investments that could lead to a future Stirling Radioisotope Generator (SRG). This paper describes the program planning processes that have been used, the currently available MMRTG, and one of the potential future systems, the eMMRTG.

  19. Automated transportation management system (ATMS) software project management plan (SPMP)

    SciTech Connect

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  20. A Planning and Budget Management System for Day Care.

    ERIC Educational Resources Information Center

    Byers, Bruce B.

    Federal guidelines and pressures for accountability make it essential that more and better planning management information be made available concerning the delivery of day care services. With the existence of a fully developed and operational system, planning and management of resource allocations can be made that can lead to an improved quality…

  1. Benefits of advanced software techniques for mission planning systems

    NASA Technical Reports Server (NTRS)

    Gasquet, A.; Parrod, Y.; Desaintvincent, A.

    1994-01-01

    The increasing complexity of modern spacecraft, and the stringent requirement for maximizing their mission return, call for a new generation of Mission Planning Systems (MPS). In this paper, we discuss the requirements for the Space Mission Planning and the benefits which can be expected from Artificial Intelligence techniques through examples of applications developed by Matra Marconi Space.

  2. Guideline for the Comprehensive Campus Master Plan System.

    ERIC Educational Resources Information Center

    State Univ. System of Florida, Tallahassee.

    This document is a guideline for institutions in the Florida State University System to use as they comply with state mandates requiring them to develop campus master plans and land management plans. It supplements the minimum criteria in the state's Administrative Code. For each element the guide offers description of its purpose, data…

  3. Information systems form large part of strategic plan.

    PubMed

    Landis, D

    1991-02-01

    Strategic planning is often a low priority for community hospitals because it is often too impractical. The difference for Ed McFall, chief information officer at Pitt County Memorial Hospital (PCMH) in Greenville, N.C., is that his hospital's and affiliated medical school's information systems plans work.

  4. Assessment of the Career Planning Support System. Final Report.

    ERIC Educational Resources Information Center

    Pearsol, James A.; And Others

    The National Center for Research in Vocational Education conducted an assessment to report information about the impact of the Career Planning Support System (CPSS) on high school staffs' planning and career development activities for student career development. (CPSS is a package of materials designed to enable a high school staff to improve…

  5. Research Perspectives for Material Requirements Planning Systems. Paper No. 434.

    ERIC Educational Resources Information Center

    Berry, W. L.; Whybark, D. Clay

    Material requirements planning (MRP) systems are described as management tools for planning and controlling production operations. A wide variety of industries and production organizations are credited as reporting significant operating improvements in such areas as inventory control, production scheduling, delivery performance, and production…

  6. Principles for Health System Capacity Planning: Insights for Healthcare Leaders.

    PubMed

    Shaw, James; Wong, Ivy; Griffin, Bailey; Robertson, Michael; Bhatia, R Sacha

    2017-01-01

    Jurisdictions across Canada and around the world face the challenge of planning high-performing and sustainable health systems in response to growing healthcare demands. In this paper, we report on the process of developing principles for health system capacity planning by the Ministry of Health and Long-Term Care in Ontario. Integrating the results of a literature review on health system planning and a symposium with representatives from local health integration networks, we describe the following six principles in detail: (1) develop an aspirational vision, (2) establish clear leadership, (3) commit to stakeholder engagement, (4) engage patients and the public, (5) build analytics infrastructure and (6) revise policy when necessary.

  7. NIF Projects Controls and Information Systems Software Quality Assurance Plan

    SciTech Connect

    Fishler, B

    2011-03-18

    Quality achievement for the National Ignition Facility (NIF) and the National Ignition Campaign (NIC) is the responsibility of the NIF Projects line organization as described in the NIF and Photon Science Directorate Quality Assurance Plan (NIF QA Plan). This Software Quality Assurance Plan (SQAP) is subordinate to the NIF QA Plan and establishes quality assurance (QA) activities for the software subsystems within Controls and Information Systems (CIS). This SQAP implements an activity level software quality assurance plan for NIF Projects as required by the LLNL Institutional Software Quality Assurance Program (ISQAP). Planned QA activities help achieve, assess, and maintain appropriate quality of software developed and/or acquired for control systems, shot data systems, laser performance modeling systems, business applications, industrial control and safety systems, and information technology systems. The objective of this SQAP is to ensure that appropriate controls are developed and implemented for management planning, work execution, and quality assessment of the CIS organization's software activities. The CIS line organization places special QA emphasis on rigorous configuration control, change management, testing, and issue tracking to help achieve its quality goals.

  8. Space Station thermal management system development status and plans

    NASA Technical Reports Server (NTRS)

    Rankin, J. G.

    1985-01-01

    The manned Space Station, as currently designed, contains a baseline thermal management system (TMS) which uses components and subsystems never before employed in manned spacecraft. The basis for the technology used in the TMS design is the result of a long-term TMS Technology Development Plan which was initiated in 1979. Rankin and Marshall (1983) have discussed the history and progress of that plan from its beginnings to early 1983. The present paper is concerned with the status of activities conducted at the NASA Lyndon B. Johnson Space Center (JSC) under this plan since 1983, taking into account also a summary of activities planned for the next several years.

  9. Real-time system for 3D neurosurgical planning

    NASA Astrophysics Data System (ADS)

    Goble, John C.; Snell, John W.; Hinckley, Ken; Kassell, Neal F.

    1994-09-01

    We have designed and implemented a computer-based system that permits rapid acquisition of digital medical images, multi- modality registration and segmentation, and 3D planning of minimally invasive neurosurgical procedures. The system, known as Netra, is optimized for real-time planning: imaging, pre- processing and planning are performed on the morning of surgery in clinically useful times. We have tested the system on procedures such as needle biopsies, depth electrode placements and craniectomies for arteriovenous malformations, aneurysms and tumors. We describe in this paper the core algorithms of our system, and discuss issues related to implementation, validation and user acceptance. We focus on techniques for physician interaction that encourage active participation by the surgeon as principal operator of the visualization and planning system.

  10. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Reilly, Charles H.; Walton, Eric K.; Kohnhorst, Paul

    1987-01-01

    A procedure is described that was used to calculate minimum required satellite separations based on total link carrier to interference requirements. Also summarized are recent results with a switching algorithm for satellite synthesis problems. Analytic solution value bounds for two of the satellite synthesis models studied are described. Preliminary results from an empirical study of alternate mixed integer programming models for satellite synthesis are presented. Research plans for the near future are discussed.

  11. Modeling to Optimize Hospital Evacuation Planning in EMS Systems.

    PubMed

    Bish, Douglas R; Tarhini, Hussein; Amara, Roel; Zoraster, Richard; Bosson, Nichole; Gausche-Hill, Marianne

    2017-01-01

    To develop optimal hospital evacuation plans within a large urban EMS system using a novel evacuation planning model and a realistic hospital evacuation scenario, and to illustrate the ways in which a decision support model may be useful in evacuation planning. An optimization model was used to produce detailed evacuation plans given the number and type of patients in the evacuating hospital, resource levels (teams to move patients, vehicles, and beds at other hospitals), and evacuation rules. Optimal evacuation plans under various resource levels and rules were developed and high-level metrics were calculated, including evacuation duration and the utilization of resources. Using this model we were able to determine the limiting resources and demonstrate how strategically augmenting the resource levels can improve the performance of the evacuation plan. The model allowed the planner to test various evacuation conditions and resource levels to demonstrate the effect on performance of the evacuation plan. We present a hospital evacuation planning analysis for a hospital in a large urban EMS system using an optimization model. This model can be used by EMS administrators and medical directors to guide planning decisions and provide a better understanding of various resource allocation decisions and rules that govern a hospital evacuation.

  12. System Summary of University Annual Work Plans, 2014-15

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2014

    2014-01-01

    The State University System of Florida has developed three tools that aid in guiding the System's future; (1) The Board of Governors' new Strategic Plan 2012-2025 is driven by goals and associated metrics that stake out where the System is headed; (2) The Board's Annual Accountability Report provides yearly tracking for how the System is…

  13. Distribution planning using a knowledge-based expert system

    SciTech Connect

    Hsu, Y.Y.; Chen, J.L. . Dept. of Electrical Engineering)

    1990-07-01

    An expert system is designed for determining substation locations and feeder configuration of a distribution system. By incorporating the heuristic rules currently followed by distribution engineers into the knowledge base, the expert system can benefit from system planners' experience in its problem-solving process. To minimize the feeder losses of the distribution plan, a novel approach, usually referred to as the location-allocation method, is proposed to determine substation locations. The expert system is implemented using the artificial language PROLONG and is designed to be used interactively. The developed expert system is applied to the planning of a distribution system in Taiwan. Test results indicate that the expert system is both efficient and user friendly in reaching the final distribution plan.

  14. Job Measurement Standards and Workload Planning in Distribution System Work.

    ERIC Educational Resources Information Center

    American Water Works Association Journal, 1979

    1979-01-01

    This report describes methods and benefits of applying standard work measurement and planning techniques to water distribution system work. The three sections of the report discuss: a general work standards survey; application; and consideration of benefits. (CS)

  15. Planning for Information Systems Development: A Living Creature.

    ERIC Educational Resources Information Center

    Hollowell, David E.

    1978-01-01

    A major information systems planning study undertaken by Boston University and recommendations that were made to enable the university to meet the new demands and changing priorities of educational management are discussed. (BH)

  16. 300 Area waste acid treatment system closure plan. Revision 1

    SciTech Connect

    1996-03-01

    This section provides a description of the Hanford Site, identifies the proposed method of 300 Area Waste Acid Treatment System (WATS) closure, and briefly summarizes the contents of each chapter of this plan.

  17. Intelligent transportation systems strategic plan: Phase 1 report

    SciTech Connect

    1998-05-01

    This interim report on an Intelligent Transportation Systems (ITS) Strategic Plan has been developed as documentation of the process of offering a vision for ITS and recommending an outline for organizational structure, infrastructure, and long-term planning for ITS in Kentucky. This plan provides an overview of the broad scope of ITS and relationships between various Intelligent Vehicle Highway Systems (IVHS) functional areas and ITS user service areas. Three of the functional areas of ITS have been addressed in this interim report with sections devoted to mission, vision, goals, and potential technology applications. Within each of the three areas, recommendations have been made for applications and technologies for deployment. A more formalized business plan for ITS will be developed to recommend specific projects for implementation. Those three functional areas are: (1) Advanced Rural Transportation Systems (ARTS), (2) Advanced Traveler Information Systems (ATIS), and (3) Commercial Vehicle Operations (CVO).

  18. Equipment acquisition plans for the SSCL magnet excitation power system

    SciTech Connect

    Winje, R.

    1993-05-01

    This report gives a brief description of the major electrical technical equipment used in the Superconducting Super Collider accelerators systems and the present laboratory plans for the acquisition of the equipment.

  19. 41. 1928 REPAIRS AND ADDITIONS TO FLOOR SYSTEM AND PLAN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. 1928 REPAIRS AND ADDITIONS TO FLOOR SYSTEM AND PLAN AND ELEVATION OF BRIDGE - East Bloomsburg Bridge, Spanning Susquehanna River at Pennsylvania Route 487 (Legislative Route 283), Bloomsburg, Columbia County, PA

  20. Program Planning and Grant Writing in One Massachusetts School System.

    ERIC Educational Resources Information Center

    Maloy, Robert W.; Seldin, Clement A.

    1982-01-01

    The Greenfield Secondary Schools Project in Greenfield (Massachusetts) includes a planning and grant-writing system, a grantsperson, and a structure encouraging community involvement and interagency cooperation, and has enabled Greenfield to finance innovation in lean times. (Author/JM)

  1. Information systems in neonatology and health planning.

    PubMed

    Di Lallo, Domenico; Di Napoli, Anteo

    2011-10-01

    Improving the well-being of infants and children is an important public health goal. To reach this objective public health authorities need in-depth knowledge of perinatal statistics as well as the organization of perinatal care. These data must be based on the use of reliable information describing both individual and organizational factors and short and long term outcomes. Several perinatal information sources are available in Italy for analyses aimed at producing evidence for health planning purposes: the National birth registry, Infant mortality registry and Neonatal networks. We describe their structure and summarize some evidence derived from the experiences conducted in the Lazio region.

  2. Engineering calculations for communications satellite systems planning

    NASA Technical Reports Server (NTRS)

    Reilly, C. H.; Levis, C. A.; Buyukdura, O. M.; Mount-Campbell, C. A.

    1986-01-01

    Observed solution times were analyzed for the extended gradient and cyclic coordinate search procedures. The times used in the analysis come from computer runs made during a previously-reported experiment conducted to assess the quality of the solutions to a BSS synthesis problem found by the two search methods. The results of a second experiment with a Fixed Satellite Service (FSS) test problem are also presented. Computational results are summarized for mixed integer programming approaches for solving FSS synthesis problems. A promising heuristic algorithm is described. A synthesis model is discussed for orbital arc allotment optimization. Research plans for the near future are also presented.

  3. System Integration Laboratory test plan (RADL Item 6-4)

    SciTech Connect

    Not Available

    1980-05-01

    A general demonstration test plan is provided for the activities to be accomplished at the SFDI Systems Integration Laboratory (SIL) at Huntington Beach. The Master Control System (MCS), the Subsystem Distributed Process Control (SDPC), the Signal Conditioning Units (SCU), and Redline Units (RLU) from the Receiver Subsystem (RS) and the Thermal Storage Subsystem (TSS) and other external interface operational functions shall be integrated and functionally demonstrated. The overall plan for the SIL activities is presented.

  4. Region Three Aerial Measurement System Flight Planning Tool - 12006

    SciTech Connect

    Messick, Chuck; Pham, Minh; Smith, Ron; Isiminger, Dave

    2012-07-01

    The Region 3 Aerial Measurement System Flight Planning Tool is used by the National Nuclear Security Agency (NNSA), United States Department of Energy, Radiological Assistance Program, Region 3, to respond to emergency radiological situations. The tool automates the flight planning package process while decreasing Aerial Measuring System response times and decreases the potential for human error. Deployment of the Region Three Aerial Measurement System Flight Planning Tool has resulted in an immediate improvement to the flight planning process in that time required for mission planning has been reduced from 1.5 hours to 15 minutes. Anecdotally, the RAP team reports that the rate of usable data acquired during surveys has improved from 40-60 percent to over 90 percent since they began using the tool. Though the primary product of the flight planning tool is a pdf format document for use by the aircraft flight crew, the RAP team has begun carrying their laptop computer on the aircraft during missions. By connecting a Global Positioning System (GPS) device to the laptop and using ESRI ArcMap's GPS tool bar to overlay the aircraft position directly on the flight plan in real time, the RAP team can evaluate and correct the aircraft position as the mission is executed. (authors)

  5. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.

  6. The Star Rating System and Medicare Advantage Plans.

    PubMed

    Sprague, Lisa

    2015-05-05

    With nearly 30 percent of Medicare beneficiaries opting to enroll in Medicare Advantage (MA) plans instead of fee-for-service Medicare, it's safe to say the MA program is quite popular. The Centers for Medicare & Medicaid Services (CMS) administers a Star Ratings program for MA plans, which offers measures of quality and service among the plans that are used not only to help beneficiaries choose plans but also to award additional payments to plans that meet high standards. These additional payments, in turn, are used by plans to provide additional benefits to beneficiaries or to reduce cost sharing--added features that are likely to factor into beneficiaries' choice of MA plans. The Star Ratings program is also meant to drive improvements in the quality of plans, and this secondary effort seems to have been successful. Despite this success, issues with the Star Ratings system remain, including: how performance metrics are developed, chosen, and maintained; how differences among beneficiary populations (particularly with regard to the dually eligible and those receiving low-income subsidies) should be recognized; and the extent to which health plans can control the variables on which they are being measured. Because the Star Ratings approach has been extended to providers of health care as well--hospitals, nursing homes, and dialysis facilities--these issues are worth exploring as CMS fine-tunes its methods of measurement.

  7. Architecture for Payload Planning System (PPS) Software Distribution

    NASA Technical Reports Server (NTRS)

    Howell, Eric; Hagopian, Jeff

    1995-01-01

    The complex and diverse nature of the pay load operations to be performed on the Space Station requires a robust and flexible planning approach, and the proper software tools which tools to support that approach. To date, the planning software for most manned operations in space has been utilized in a centralized planning environment. Centralized planning is characterized by the following: performed by a small team of people, performed at a single location, and performed using single-user planning systems. This approach, while valid for short duration flights, is not conducive to the long duration and highly distributed payload operations environment of the Space Station. The Payload Planning System (PPS) is being designed specifically to support the planning needs of the large number of geographically distributed users of the Space Station. This paper problem provides a general description of the distributed planning architecture that PPS must support and describes the concepts proposed for making PPS available to the Space Station payload user community.

  8. System and method for regulating EGR cooling using a rankine cycle

    SciTech Connect

    Ernst, Timothy C.; Morris, Dave

    2015-12-22

    This disclosure relates to a waste heat recovery (WHR) system and method for regulating exhaust gas recirculation (EGR) cooling, and more particularly, to a Rankine cycle WHR system and method, including a recuperator bypass arrangement to regulate EGR exhaust gas cooling for engine efficiency improvement and thermal management. This disclosure describes other unique bypass arrangements for increased flexibility in the ability to regulate EGR exhaust gas cooling.

  9. Career Planning Modules for the Officer Career Information and Planning System.

    ERIC Educational Resources Information Center

    Phillips, Susan D.; And Others

    This discussion of the modules in an experimental computer-aided system for officer career information and planning system (OCIPS) includes the reasons for its development, a description of the seven modules, and the findings of a preliminary test of four of the modules for feasibility and credibility. Initially developed in response to a need…

  10. Plans for a National Physics Information System.

    ERIC Educational Resources Information Center

    Alt, Franz L.; Herschman, Arthur

    Against a background of widespread interest in national information systems, the American Institute of Physics is developing such a system for physics. This program pivots on the design of a new classification system for physics which is to be used, in conjunction with free-language index terms, for the intellectual organization of the physics…

  11. Plans for a National Physics Information System.

    ERIC Educational Resources Information Center

    Alt, Franz L.; Herschman, Arthur

    Against a background of widespread interest in national information systems, the American Institute of Physics is developing such a system for physics. This program pivots on the design of a new classification system for physics which is to be used, in conjunction with free-language index terms, for the intellectual organization of the physics…

  12. Vehicle management and mission planning systems with shuttle applications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A preliminary definition of a concept for an automated system is presented that will support the effective management and planning of space shuttle operations. It is called the Vehicle Management and Mission Planning System (VMMPS). In addition to defining the system and its functions, some of the software requirements of the system are identified and a phased and evolutionary method is recommended for software design, development, and implementation. The concept is composed of eight software subsystems supervised by an executive system. These subsystems are mission design and analysis, flight scheduler, launch operations, vehicle operations, payload support operations, crew support, information management, and flight operations support. In addition to presenting the proposed system, a discussion of the evolutionary software development philosophy that the Mission Planning and Analysis Division (MPAD) would propose to use in developing the required supporting software is included. A preliminary software development schedule is also included.

  13. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System security plan: contents. 659.23 Section 659.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.23 System...

  14. Waste feed delivery program systems engineering implementation plan

    SciTech Connect

    O`Toole, S.M.

    1998-09-24

    This document defines the systems engineering processes and products planned by the Waste Feed Delivery Program to develop the necessary and sufficient systems to provide waste feed to the Privatization Contractor for Phase 1. It defines roles and responsibilities for the performance of the systems engineering processes and generation of products.

  15. Metis Hub: The Development of an Intuitive Project Planning System

    SciTech Connect

    McConnell, Rachael M.

    2015-08-26

    The goal is to develop an intuitive, dynamic, and consistent interface for the Metis Planning System by combining user requirements and human engineering concepts. The system is largely based upon existing systems so some tools already have working models that we can follow. However, the web-based interface is completely new.

  16. Systems Analysis and Its Relationship to Educational Planning.

    ERIC Educational Resources Information Center

    Knezevich, S.J.

    From the systems viewpoint, educational planning is the mechanism through which the educational system makes its goals specific and adapt its priorities, resources, and operational patterns to the changing environmental forces of its particular society. The systems-oriented administrator is a change agent and innovative strategist who delegates…

  17. Administrative Decision-Making and Computer-Based Planning Systems.

    ERIC Educational Resources Information Center

    Weischadle, David E.

    This paper presents the overall conceptual framework in which information gathered and stored by computers can be transformed into a comprehensive planning system useful in administrative decisionmaking. Identified and discussed are information needs (enrollment, costs, resources, and measurements) and a sample system (STEP - System for Trenton's…

  18. Computers and Information Systems in Planning and Related Governmental Functions.

    ERIC Educational Resources Information Center

    Tucker, Dorothy; Vance, Mary, Ed.

    The 266 items cited include material published since July 1960, organized in the following ten groups: (1) general discussion, and feasibility; (2) statewide electronic data processing (EDP) systems; (3) EDP in local governments; (4) intergovernmental EDP systems; (5) EDP in the planning agency; (6) data banks and information systems; (7) computer…

  19. Archimedes: A system that plans and executes mechanical assemblies

    SciTech Connect

    Strip, D.

    1990-01-01

    Archimedes is a prototype mechanical assembly system which generates and executes robot assembly programs from a CAD model input. The system addresses the unrealized potential for flexibility in robotic mechanical assembly applications by automating the programming task. Input is a solid model of the finished assembly. Parts relationships and geometric constraints are deduced from the solid model. A rule-based planner generates a generic'' assembly plan that satisfies the geometric constraints, as well as other constraints embodied in the rules. A retargetable plan compiler converts the generic plan into code specific to an application environment. Execution of the compiled plan in a workcell containing an Adept Two robot, a vision system, and other parts handling equipment will be shown on videotape.

  20. Automatic Production Planning System to Achieve Flexible Direct Machining

    NASA Astrophysics Data System (ADS)

    Nakamoto, Keiichi; Shirase, Keiichi; Wakamatsu, Hidefumi; Tsumaya, Akira; Arai, Eiji

    For shortening of production lead-time, it is needed to eliminate time and efforts for process and operation planning after product design. However, a conventional NC machine tool has no autonomy and intelligence to achieve direct machining operation or “Rapid Manufacturing”. Because CL data and cutting parameters for machining operation have to be determined precisely in process and operation planning. In this study, in order to realize an autonomous and intelligent machine tool, the digital copy milling system which allows to generate tool paths during machining operation, and the trouble free machining strategy which allows to adapt cutting parameters, have been developed. And, an automatic process and operation planning system has been developed to integrate with the functions mentioned. This planning system works on commercial CAD software, and a prototype of autonomous and intelligent machine tool can achieve direct machining operation or “Rapid Manufacturing” which does not require any effort to prepare an NC program.

  1. OzCare: a workflow automation system for care plans.

    PubMed Central

    Lee, W.; Kaiser, G. E.; Clayton, P. D.; Sherman, E. H.

    1996-01-01

    An automated environment for implementing and monitoring care plans and practice guidelines is very important to the reduction of hospital costs and optimization of medical care. The goal of our research effort is to design a general system architecture that facilitates the implementation of (potentially) numerous care plans. Our approach is unique in that we apply the principles and technologies of Oz a multi-user collaborative workflow system that has been used as a software engineering environment framework, to hospital care planning. We utilize not only the workflow modeling and execution facilities of Oz, but also its open-system architecture to interface it with the World Wide Web, the Medical Logic Module server, and other components of the clinical information system. Our initial proof-of-concept system, OzCare, is constructed on top of the existing Oz system. Through several experiments in which we used this system to implement some Columbia-Presbyterian Medical Center care plans, we demonstrated that our system is capable and flexible for care plan automation. PMID:8947732

  2. NASA presentation. [wind energy conversion systems planning

    NASA Technical Reports Server (NTRS)

    Thomas, R. L.

    1973-01-01

    The development of a wind energy system is outlined that supplies reliable energy at a cost competitive with other energy systems. A government directed industry program with strong university support is recommended that includes meteorological studies to estimate wind energy potentials and determines favorable regions and sites for wind power installations. Key phases of the overall program are wind energy conversion systems, meteorological wind studies, energy storage systems, and environmental impact studies. Performance testing with a prototype wind energy conversion and storage system is projected for Fiscal 1977.

  3. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  4. Automatic Scheduling and Planning (ASAP) in future ground control systems

    NASA Technical Reports Server (NTRS)

    Matlin, Sam

    1988-01-01

    This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.

  5. NOTE: A VMAT planning solution for prostate patients using a commercial treatment planning system

    NASA Astrophysics Data System (ADS)

    Boylan, C. J.; Golby, C.; Rowbottom, C. G.

    2010-07-01

    Volumetric modulated arc therapy (VMAT) is a rotational delivery technique which offers the potential of improved dose distributions and shorter treatment times when compared to fixed-beam intensity-modulated radiation therapy (IMRT). This note describes the use of an existing treatment planning system (Philips Pinnacle3 v.8.0), supplemented by in-house software, to produce a single-arc VMAT prostate plan. While a number of planning systems for the Elekta VMAT platform are commercially available, the use of an in-house solution has allowed more detailed investigations of VMAT planning, as well as greater control over the optimization process. The solution presented here begins with a static step-and-shoot IMRT approach to provide initial segment shapes, which are then modified and sequenced into 60 equally spaced control points in a 360° arc. Dose-volume histogram comparisons demonstrate that this VMAT planning method offers multiple dose level target coverage comparable to that from a standard IMRT approach. The VMAT plans also show superior sparing of critical structures such as the rectum and bladder. Delivery times are reduced with the VMAT method, and the results of dosimetric verification, resilience and repeatability tests indicate that the solution is robust.

  6. Aviation System Capacity Plan (1991-1992)

    DTIC Science & Technology

    1992-01-01

    DSB) DVOR , 50 ing compatible DME systems will replace existing DME DVORs have been retrofitted with RNMM and DSB, 35 systems at 40 VOR/DME sites. The...at ILSs, and convert estate considerations, and site suitability. Conventional VORs 94 VORs to DSB DVOR are being converted to Doppler VORs to solve...DSUA ................ Dynamic Special-Use Airspace MLS ................... Microwave Landing System DVOR ................ Doppler VOR MOA

  7. Tracking and Data Relay Satellite System (TDRSS) frequency plan

    NASA Technical Reports Server (NTRS)

    1974-01-01

    The functions of the Tracking and Data Relay Satellite System (TDRSS) are discussed. The primary purpose of the system is to transmit signals to and receive signals from earth orbiting user spacecraft, and provide data from which user spacecraft ephemerides can be calculated. The system configuration is described and illustrated. The frequency plan is analyzed to show the frequency coverage and the signal handling capability of the system. The characteristics of the components of the system are tabulated.

  8. Strategic planning--a plan for excellence for South Haven Health System.

    PubMed

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  9. Resource-based action planning for multiagent systems

    NASA Astrophysics Data System (ADS)

    Freund, Eckhard; Hoffmann, Katharina; Rossmann, Juergen

    1998-10-01

    With the use of multi-robot-systems new chances and perspectives are revealed for industrial, space- and underwater-applications. At the IRF, a versatile multi- robot-control, which fully exploits the inherent flexibility of a multi-robot-system, has been developed. In order to guarantee optimized system-throughput and increased autonomy, the system builds on a new resource-based action planning approach to coordinate the different robot manipulators and other automation components in the workcell. An important issue of the realized action planning component to be applicable to real world problems is that it is realized as an integral part of the hierarchical multi- robot control structure IRCS (Intelligent Robot Control System). The IRCS is the multi-robot control that was chosen by the German Space Agency (DLR) for major space automation projects. In this structure the resource-based action planning component is tightly integrated with components for coordinated task execution and collision avoidance to guarantee save operation of all agents in the multi-robot system. As the action planning component `understands' task descriptions on a high level of abstraction it is also the perfect counterpart for a Projective Virtual Reality (VR) system. The paper will describe the mechanism of resource based action planning, the practical experiences gained from the implementation for the IRCS as well as its services to support VR-based man machine interfaces.

  10. The conceptual design of a radiation oncology planning system.

    PubMed

    Jung, B; Montelius, A; Dahlin, H; Ekström, P; Ahnesjö, A; Högström, B; Glimelius, B

    1997-02-01

    The conceptual design of a three-dimensional, radiation oncology planning system is described. To assure that clinical needs were met, the working routines in two major Swedish radiation oncology departments were analysed in detail. Generic work flow was identified and mapped and compared to those in other institutions. The flow was partitioned into a number of nodes that together formed a basis for the design of the system handling logistics. The design criteria of this system emphasised accommodation of current clinical practice and traditional treatment modalities, and facilitated means to validate the computational techniques. The system should also allow for new procedures and was based on the analysis of current practice and a synthetic idea of how 3D treatment planning should be done. The final product supports the treatment planning work in its entirety. It is believed that the techniques followed are of interest to those engaged in computer systems of similar purposes and complexities.

  11. A simple planning technique of craniospinal irradiation in the eclipse treatment planning system.

    PubMed

    Athiyaman, Hemalatha; Mayilvaganan, Athiyaman; Singh, Daleep

    2014-10-01

    A new planning method for Craniospinal Irradiation by Eclipse treatment planning system using Field alignment, Field-in-Field technique was developed. Advantage of this planning method was also studied retrospectively for previously treated five patients of medulloblastoma with variable spine length. Plan consists of half beam blocked parallel opposed cranium, and a single posterior cervicospine field was created by sharing the same isocenter, which obviates divergence matching. Further, a single symmetrical field was created to treat remaining Lumbosacral spine. Matching between a inferior diverging edge of cervicospine field and superior diverging edge of a Lumbosacral field was done using the field alignment option. 'Field alignment' is specific option in the Eclipse Treatment Planning System, which automatically matches the field edge divergence as per field alignment rule. Multiple segments were applied in both the spine field to manage with hot and cold spots created by varying depth of spinal cord. Plan becomes fully computerized using this field alignment option and multiple segments. Plan evaluation and calculated mean modified Homogeneity Index (1.04 and 0.1) ensured that dose to target volume is homogeneous and critical organ doses were within tolerance. Dose variation at the spinal field junction was verified using ionization chamber array (I'MatriXX) for matched, overlapped and gap junction spine fields; the delivered dose distribution confirmed the ideal clinical match, over exposure and under exposure at the junction, respectively. This method is simple to plan, executable in Record and Verify mode and can be adopted for various length of spinal cord with only two isocenter in shorter treatment time.

  12. Floating production systems planned for Italy, Nigeria

    SciTech Connect

    Not Available

    1985-05-01

    EMH has signed a contract to design, fabricate and install a permanent deepwater, gravity-based single-point mooring (SPM) system and floating oil storage facility in Societa Energio Montedison's (SEM) Vega field off Italy. The design of the system is described. The system is designed to accomodate production rates of 75,000 bpd. The oil will be loaded from the storage tanker into shuttle tankers which will take it to area refineries. The shuttle tankers can moor either in tandem or side-by-side for loading. Also described in this paper are three Nigerian offshore fields -- Akam, Adanga and Ebughu -- being developed by Ashland Oil. They will be brought onstream through the use of an integrated floating production, storage and offloading (FPSO) system. Production from all three fields will be piped to a central manifold platform to which a tanker will be permanently moored via a soft-yoke mooring system.

  13. The optimal planning of computerized manufacturing systems

    NASA Astrophysics Data System (ADS)

    Lewis, W. C., Jr.; Barash, M. M.; Solberg, J. J.

    1980-12-01

    A new class of control algorithms for computer operated manufacturing systems (CMS) was defined and tested. The definition is sufficient to permit construction of any element of the new class by a practitioner with backgrounds in electronic devices, NC machine tools, computer operating systems, and data flow. Reliability, repairability, and extensibility were considered. The test applied the new class to control two simulated systems-one similar to existing systems, the other using adaptive machine tools. For each system, the new class functioned successfully. Non-failing machine tool utilization exceeded 95 percent for failure rates from 3-16 percent per machine tool. The batch weights had a strong effect on relative flow time.

  14. Resource Planning Model: An Integrated Resource Planning and Dispatch Tool for Regional Electric Systems

    SciTech Connect

    Mai, T.; Drury, E.; Eurek, K.; Bodington, N.; Lopez, A.; Perry, A.

    2013-01-01

    This report introduces a new capacity expansion model, the Resource Planning Model (RPM), with high spatial and temporal resolution that can be used for mid- and long-term scenario planning of regional power systems. Although RPM can be adapted to any geographic region, the report describes an initial version of the model adapted for the power system in Colorado. It presents examples of scenario results from the first version of the model, including an example of a 30%-by-2020 renewable electricity penetration scenario.

  15. Intelligent Planning and Scheduling for Controlled Life Support Systems

    NASA Technical Reports Server (NTRS)

    Leon, V. Jorge

    1996-01-01

    Planning in Controlled Ecological Life Support Systems (CELSS) requires special look ahead capabilities due to the complex and long-term dynamic behavior of biological systems. This project characterizes the behavior of CELSS, identifies the requirements of intelligent planning systems for CELSS, proposes the decomposition of the planning task into short-term and long-term planning, and studies the crop scheduling problem as an initial approach to long-term planning. CELSS is studied in the realm of Chaos. The amount of biomass in the system is modeled using a bounded quadratic iterator. The results suggests that closed ecological systems can exhibit periodic behavior when imposed external or artificial control. The main characteristics of CELSS from the planning and scheduling perspective are discussed and requirements for planning systems are given. Crop scheduling problem is identified as an important component of the required long-term lookahead capabilities of a CELSS planner. The main characteristics of crop scheduling are described and a model is proposed to represent the problem. A surrogate measure of the probability of survival is developed. The measure reflects the absolute deviation of the vital reservoir levels from their nominal values. The solution space is generated using a probability distribution which captures both knowledge about the system and the current state of affairs at each decision epoch. This probability distribution is used in the context of an evolution paradigm. The concepts developed serve as the basis for the development of a simple crop scheduling tool which is used to demonstrate its usefulness in the design and operation of CELSS.

  16. Space Station Mission Planning System (MPS) development study. Volume 2

    NASA Technical Reports Server (NTRS)

    Klus, W. J.

    1987-01-01

    The process and existing software used for Spacelab payload mission planning were studied. A complete baseline definition of the Spacelab payload mission planning process was established, along with a definition of existing software capabilities for potential extrapolation to the Space Station. This information was used as a basis for defining system requirements to support Space Station mission planning. The Space Station mission planning concept was reviewed for the purpose of identifying areas where artificial intelligence concepts might offer substantially improved capability. Three specific artificial intelligence concepts were to be investigated for applicability: natural language interfaces; expert systems; and automatic programming. The advantages and disadvantages of interfacing an artificial intelligence language with existing FORTRAN programs or of converting totally to a new programming language were identified.

  17. DEVELOPMENT OF INTEGRATED RAILWAY LINEAR PLAN SUPPORT SYSTEM

    NASA Astrophysics Data System (ADS)

    Kobayashi, Mitsuaki; Horii, Hironobu

    A rail alignment has a great effect on travelling performance, speed, and time. We have developed a total system of rail alignment planning powered by a coordinate calculation program of line shapes, CAD, 3D simulation technology, which makes it possible to plan rail tracks by a graphical user interface for the people who posess a certain level of knowledge about a rail alignment. This system has functions of 2D design (plane line shape calculation, layout of turnouts), longitudinal section profile design (vertical line shape calculation), and cross section profile design of rail tracks. It also enables to check the rail track construction gauge and plan a rail track structure in a 3D view. These functions facilitated a simulation with accurate coordinate calculation results and made high-quality rail alignment planning effective.

  18. Commissioning of brachytherapy module of Oncentra MasterPlan treatment planning system.

    PubMed

    de Oliveira, Carla Alves; Lopes, Maria do Carmo; Matos, Armanda

    2009-12-01

    To describe the tests that have been performed in order to commission the Brachytherapy module, version 3.2, service pack 3.0, of the Oncentra MasterPlan treatment plan system (OB), from Nucletron. The results were benchmarked against those obtained with the Plato system, v 14.3.7, also from Nucletron, used in the clinical routine. Commissioning was performed taking Plato, v 14.3.7 as the standard TPS used in clinical practice. Commissioning tests were divided into two categories: i) simple geometric catheter configurations and ii) clinical intracavitary gynaecological and interstitial breast implants. For category i), also manual independent point dose calculations following the TG-43 dosimetry protocol were included in the comparisons. For category ii), the treatment plan comparisons were based on the calculated dose distributions in CT axial plans and on the dose-volume quality indexes following the local clinical acceptance criteria. Similar optimization tools were used in both systems. IPSA in OB was tested for planning interstitial breast implants and compared with the optimization process used with Plato in the clinical routine. Regarding the point dose calculations, the agreement was better than 1%. For the clinical compared cases and using the same optimization tools all plans ended in similar dose distributions and very close quality indexes. Nevertheless, for endovaginal treatment plans, a slightly different value for the DTGR parameter had to be used (0.452, instead of 0.5 used as default in PLATO) in order to achieve the same dwell time for each activated source dwell position. Concerning interstitial breast implants, the IPSA algorithm constitutes a fast tool to reach a close clinical acceptable solution but Graphical Optimization is still needed. Considering these results the OB module was accepted for clinical use despite some persisting limitations, such as no consideration of heterogeneities or options for applicator shielding.

  19. Administration: Planning, Programming, Budgeting, and Execution System

    DTIC Science & Technology

    2007-11-02

    Staffing Standards System MSA Manpower Standards Application MSLS Missiles Procurement, Army (appropriation) MTMC Military Traffic Management Command MTOE...command. Military Traffic Management Command ( MTMC ), assigned to U.S. Transportation Command (USTRANSCOM) National command authorities The President and

  20. Plans for wind energy system simulation

    NASA Technical Reports Server (NTRS)

    Dreier, M. E.

    1978-01-01

    A digital computer code and a special purpose hybrid computer, were introduced. The digital computer program, the Root Perturbation Method or RPM, is an implementation of the classic floquet procedure which circumvents numerical problems associated with the extraction of Floquet roots. The hybrid computer, the Wind Energy System Time domain simulator (WEST), yields real time loads and deformation information essential to design and system stability investigations.

  1. Approach trajectory planning system for maximum concealment

    NASA Technical Reports Server (NTRS)

    Warner, David N., Jr.

    1986-01-01

    A computer-simulation study was undertaken to investigate a maximum concealment guidance technique (pop-up maneuver), which military aircraft may use to capture a glide path from masked, low-altitude flight typical of terrain following/terrain avoidance flight enroute. The guidance system applied to this problem is the Fuel Conservative Guidance System. Previous studies using this system have concentrated on the saving of fuel in basically conventional land and ship-based operations. Because this system is based on energy-management concepts, it also has direct application to the pop-up approach which exploits aircraft performance. Although the algorithm was initially designed to reduce fuel consumption, the commanded deceleration is at its upper limit during the pop-up and, therefore, is a good approximation of a minimum-time solution. Using the model of a powered-lift aircraft, the results of the study demonstrated that guidance commands generated by the system are well within the capability of an automatic flight-control system. Results for several initial approach conditions are presented.

  2. Verification and validation plan for the SFR system analysis module

    SciTech Connect

    Hu, R.

    2014-12-18

    This report documents the Verification and Validation (V&V) Plan for software verification and validation of the SFR System Analysis Module (SAM), developed at Argonne National Laboratory for sodium fast reactor whole-plant transient analysis. SAM is developed under the DOE NEAMS program and is part of the Reactor Product Line toolkit. The SAM code, the phenomena and computational models of interest, the software quality assurance, and the verification and validation requirements and plans are discussed in this report.

  3. 2006 Marine Corps Systems Command Advanced Planning Briefing to Industry

    DTIC Science & Technology

    2006-04-14

    WIN” Marriott Baltimore Waterfront Hotel Baltimore, Maryland April 13 - 14, 2006 Advanced Planning Briefing to Industry 2006 MARINE CORPS SYSTEMS...Planning Briefing to Industry Day April 13 - 14, 2006, at the Marriott Baltimore Waterfront Hotel , Baltimore, Maryland. The MCSC has not had an...or operations officers will be manning the displays. They will be able to answer questions and make appointments. This kiosk will be giving out MCSC

  4. Software configuration management plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  5. Motion Planning for a Direct Metal Deposition Rapid Prototyping System

    SciTech Connect

    AMES,ARLO L.; HENSINGER,DAVID M.; KUHLMANN,JOEL L.

    1999-10-18

    A motion planning strategy was developed and implemented to generate motion control instructions from solid model data for controlling a robotically driven solid free-form fabrication process. The planning strategy was tested using a PUMA type robot arm integrated into a LENS{trademark} (Laser Engineered Net Shape) system. Previous systems relied on a series of x, y, and z stages, to provide a minimal coordinated motion control capability. This limited the complexity of geometries that could be constructed. With the coordinated motion provided by a robotic arm, the system can produce three dimensional parts by ''writing'' material onto any face of existing material. The motion planning strategy relied on solid model geometry evaluation and exploited robotic positioning flexibility to allow the construction of geometrically complex parts. The integration of the robotic manipulator into the LENS{trademark} system was tested by producing metal parts directly from CAD models.

  6. Organizing for the 'second curve': combining health plans and provider systems.

    PubMed

    Eggbeer, Bill; Hauser, Martin; Johnson, Steven

    2015-01-01

    Provider systems should ask four questions as they seek to incorporate health plans. Is the health plan on track to build critical mass quickly enough? Does the plan balance provider and health plan business priorities? Is the provider system willing to let its health plan compete freely in the market? Is the provider system's overall vision understood and backed internally?

  7. IBM PC/IX operating system evaluation plan

    NASA Technical Reports Server (NTRS)

    Dominick, Wayne D. (Editor); Granier, Martin; Hall, Philip P.; Triantafyllopoulos, Spiros

    1984-01-01

    An evaluation plan for the IBM PC/IX Operating System designed for IBM PC/XT computers is discussed. The evaluation plan covers the areas of performance measurement and evaluation, software facilities available, man-machine interface considerations, networking, and the suitability of PC/IX as a development environment within the University of Southwestern Louisiana NASA PC Research and Development project. In order to compare and evaluate the PC/IX system, comparisons with other available UNIX-based systems are also included.

  8. Operational aspects of a spacecraft planning/scheduling expert system

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Littlefield, Ronald G.; Beyer, David S.

    1987-01-01

    Various operational aspects of the Earth Radiation Budget Satellite (ERBS) Tracking and Data Relay Satellite System (TDRSS) are described. The ERBS-TDRSS Contract Planning System is an expert system which has been used operationally since June 1987 by the ERBS Flight Operations Team (FOT) at Goddard Space Flight Center to build weekly schedules of requests for service from the TDRSS. The basic operation of the system and significant enhancements and changes are discussed.

  9. Civil Engineering Work Information Management System (WIMS) Planning Guide,

    DTIC Science & Technology

    1985-04-01

    Over a four-year period beginning in 1985, the Air Force will purchase and install 130 Work Information Management System minicomputers at a cost of...almost 100 million dollars. Currently there is no consolidated guidance available to help the Work Information Management System Project Managers...install and implement the system at their bases. The Civil Engineering Work Information Management System (WIMS) Planning Guide fills that gap. This guide

  10. Acceptance test plan for the Waste Information Control System

    SciTech Connect

    Flynn, D.F.

    1994-09-14

    This document describes the acceptance test plan for the WICS system. The Westinghouse Hanford Company (WHC) Hazardous Material Control Group (HMC) of the 222-S Laboratory has requested the development of a system to help resolve many of the difficulties associated with tracking and data collection of containers and drums of waste. This system has been identified as Waste Information and Control System (WICS). The request for developing and implementing WICS has been made to the Automation and Simulation Engineering Group (ASE).

  11. Integrating Effective Planning Horizons into an Intelligent Systems Architecture

    DTIC Science & Technology

    2002-08-01

    Integrating Effective Planning Horizons into an Intelligent Systems Architecture J. P. Gunderson and L. F. Gunderson Gunderson and Gunderson, Inc...Intelligent System. 1 INTRODUCTION The world is not a perfect place, and if intelligent systems are to function effectively they must be capable of handling...machine based intelligence [6]. Thus, it appears that all intelligent systems (whether biologic or electronic) must make trade-offs between cognition

  12. Advanced systems engineering and network planning support

    NASA Technical Reports Server (NTRS)

    Walters, David H.; Barrett, Larry K.; Boyd, Ronald; Bazaj, Suresh; Mitchell, Lionel; Brosi, Fred

    1990-01-01

    The objective of this task was to take a fresh look at the NASA Space Network Control (SNC) element for the Advanced Tracking and Data Relay Satellite System (ATDRSS) such that it can be made more efficient and responsive to the user by introducing new concepts and technologies appropriate for the 1997 timeframe. In particular, it was desired to investigate the technologies and concepts employed in similar systems that may be applicable to the SNC. The recommendations resulting from this study include resource partitioning, on-line access to subsets of the SN schedule, fluid scheduling, increased use of demand access on the MA service, automating Inter-System Control functions using monitor by exception, increase automation for distributed data management and distributed work management, viewing SN operational control in terms of the OSI Management framework, and the introduction of automated interface management.

  13. Automated Procurement System (APS) revised project management plan (DS-03)

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1995-01-01

    The Project Plan is the governing document for the implementation of the Automated Procurement System (APS). It includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  14. University of Georgia: System of Program Planning and Budgeting.

    ERIC Educational Resources Information Center

    Sterns, A. A.

    This report reflects the status of conceptualization, progress, and partial implementation of a system of program planning and budgeting (PPB) at the University of Georgia (UGA). Emphasis is placed on detailed information flow necessary for implementation of a PPB system, how the data files existing at UGA will support further development and…

  15. Training in Information Systems for Local and Regional Planning.

    ERIC Educational Resources Information Center

    Regional Development Dialogue, 1987

    1987-01-01

    This issue of Regional Development Dialogue contains selected papers presented at an expert meeting sponsored by the United Nations Centre for Regional Development on training in information systems for local and regional planning in developing countries. The following papers are included: (1) "Information System for Local and Regional…

  16. Training in Information Systems for Local and Regional Planning.

    ERIC Educational Resources Information Center

    Regional Development Dialogue, 1987

    1987-01-01

    This issue of Regional Development Dialogue contains selected papers presented at an expert meeting sponsored by the United Nations Centre for Regional Development on training in information systems for local and regional planning in developing countries. The following papers are included: (1) "Information System for Local and Regional…

  17. FOCUS: a fire management planning system -- final report

    Treesearch

    Frederick W. Bratten; James B. Davis; George T. Flatman; Jerold W. Keith; Stanley R. Rapp; Theodore G. Storey

    1981-01-01

    FOCUS (Fire Operational Characteristics Using Simulation) is a computer simulation model for evaluating alternative fire management plans. This final report provides a broad overview of the FOCUS system, describes two major modules-fire suppression and cost, explains the role in the system of gaming large fires, and outlines the support programs and ways of...

  18. Backup and recovery plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The purpose of this Backup and Recovery Plan (BRP) is to provide guidelines for backup and recovery requirements of HANDI 2000 [Hanford Data Integration 2000] file systems and databases. The methods used to accomplish this are not new. The intent is to use the existing processes and procedures where possible to meet the needs of the HANDI 2000 System.

  19. A Methodology and Linear Model for System Planning and Evaluation.

    ERIC Educational Resources Information Center

    Meyer, Richard W.

    1982-01-01

    The two-phase effort at Clemson University to design a comprehensive library automation program is reported. Phase one was based on a version of IBM's business system planning methodology, and the second was based on a linear model designed to compare existing program systems to the phase one design. (MLW)

  20. ARM Unmanned Aerial Systems Implementation Plan

    SciTech Connect

    Schmid, Beat; Ivey, Mark

    2016-11-01

    Recent advances in Unmanned Aerial Systems (UAS) coupled with changes in the regulatory environment for operations of UAS in the National Airspace increase the potential value of UAS to the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility. UAS include unmanned aerial vehicles (UAV) and tethered balloon systems (TBS). The roles UAVs and TBSs could play within the ARM Facility, particularly science questions they could help address, have been discussed in several workshops, reports, and vision documents, including: This document describes the implementation of a robust and vigorous program for use of UAV and TBS for the science missions ARM supports.

  1. Systems Engineering Assessment & Workforce Development Plan

    DTIC Science & Technology

    2012-11-05

    28 Table 6: How well the course satisfied the Learning Objectives (APG) ........................... 29 Table 7...34 Table 9: How well the course satisfied the Learning Objectives (ARDEC...passive stakeholders and their perceptions of a system of interest. Identify essential features that are critical to satisfy customers and

  2. Needs Assessments of Corps Planning Management Systems.

    DTIC Science & Technology

    1985-08-01

    with the most capable package being Primavera Project Planner ($2,500). No one system is seen as useful at all levels in a District - study managers... Primavera or PMS-80. The Harvard Project Manager is not considered to have sufficient detail, and • ithe Harvard Total Project Manager is viewed as

  3. Planning bioinformatics workflows using an expert system.

    PubMed

    Chen, Xiaoling; Chang, Jeffrey T

    2017-04-15

    Bioinformatic analyses are becoming formidably more complex due to the increasing number of steps required to process the data, as well as the proliferation of methods that can be used in each step. To alleviate this difficulty, pipelines are commonly employed. However, pipelines are typically implemented to automate a specific analysis, and thus are difficult to use for exploratory analyses requiring systematic changes to the software or parameters used. To automate the development of pipelines, we have investigated expert systems. We created the Bioinformatics ExperT SYstem (BETSY) that includes a knowledge base where the capabilities of bioinformatics software is explicitly and formally encoded. BETSY is a backwards-chaining rule-based expert system comprised of a data model that can capture the richness of biological data, and an inference engine that reasons on the knowledge base to produce workflows. Currently, the knowledge base is populated with rules to analyze microarray and next generation sequencing data. We evaluated BETSY and found that it could generate workflows that reproduce and go beyond previously published bioinformatics results. Finally, a meta-investigation of the workflows generated from the knowledge base produced a quantitative measure of the technical burden imposed by each step of bioinformatics analyses, revealing the large number of steps devoted to the pre-processing of data. In sum, an expert system approach can facilitate exploratory bioinformatic analysis by automating the development of workflows, a task that requires significant domain expertise. https://github.com/jefftc/changlab. jeffrey.t.chang@uth.tmc.edu.

  4. LSS systems planning and performance program

    NASA Technical Reports Server (NTRS)

    Mckenna, Victoria Jones; Dendy, Michael J.; Naumann, Charles B.; Rice, Sally A.; Weathers, John M.

    1993-01-01

    This report describes, using viewgraphs, the Marshall Space Flight Center's Large Space Structures Ground Test Facilities located in building 4619. Major topics include the Active Control Evaluation of Systems (ACES) Laboratory; the Control-Structures Interaction/Controls, Astrophysics, and Structures Experiment in Space (CSI/CASES); Advanced Development Facility; and the ACES Guest Investigator Program.

  5. Bibliography: Program-Planning-Budgeting System (PPBS) and Decision-Making, Budgeting and Planning Within the Context of Higher Education.

    ERIC Educational Resources Information Center

    Raider, Melvyn C.

    This document presents a 143-item bibliography concerning program planning budgeting systems and decision making, budgeting, and planning within the context of higher education. Citations are categorized according to books, articles, monographs, reports, and other sources. (MJM)

  6. High-Level Waste Systems Plan. Revision 7

    SciTech Connect

    Brooke, J.N.; Gregory, M.V.; Paul, P.; Taylor, G.; Wise, F.E.; Davis, N.R.; Wells, M.N.

    1996-10-01

    This revision of the High-Level Waste (HLW) System Plan aligns SRS HLW program planning with the DOE Savannah River (DOE-SR) Ten Year Plan (QC-96-0005, Draft 8/6), which was issued in July 1996. The objective of the Ten Year Plan is to complete cleanup at most nuclear sites within the next ten years. The two key principles of the Ten Year Plan are to accelerate the reduction of the most urgent risks to human health and the environment and to reduce mortgage costs. Accordingly, this System Plan describes the HLW program that will remove HLW from all 24 old-style tanks, and close 20 of those tanks, by 2006 with vitrification of all HLW by 2018. To achieve these goals, the DWPF canister production rate is projected to climb to 300 canisters per year starting in FY06, and remain at that rate through the end of the program in FY18, (Compare that to past System Plans, in which DWPF production peaked at 200 canisters per year, and the program did not complete until 2026.) An additional $247M (FY98 dollars) must be made available as requested over the ten year planning period, including a one-time $10M to enhance Late Wash attainment. If appropriate resources are made available, facility attainment issues are resolved and regulatory support is sufficient, then completion of the HLW program in 2018 would achieve a $3.3 billion cost savings to DOE, versus the cost of completing the program in 2026. Facility status information is current as of October 31, 1996.

  7. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    SciTech Connect

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation.

  8. Strategic Planning Within Weapon System Program Offices at Aeronautical Systems Division.

    DTIC Science & Technology

    1985-09-01

    Air Force Systems Command (AFSC). The research indicated that separate, distinguishable groups solely responsible for strategic planning were the...exception and not the rule. The understanding of where strategic planning was accomplished for the programs varied from person to person. Specified... strategic planning were insufficient time, unpredictable political environment, inadequately defined objective and inexperienced managers. The

  9. Quest for the basic plan of nervous system circuitry.

    PubMed

    Swanson, Larry W

    2007-10-01

    The basic plan of nervous system organization has been investigated since classical antiquity. The first model centered on pneumas pumped from sensory nerves through the ventricular system and out motor nerves to muscles. It was popular well into the 17th century and diverted attention from the organization of brain parenchyma itself. Willis focused on gray matter production and white matter conduction of pneumas in 1664, and by the late 19th century a clear cellular model of nervous system organization based on sensory, motor, and association neuron classes transmitting nerve impulses was elaborated by Cajal and his contemporaries. Today, revolutionary advances in experimental pathway tracing methods, molecular genetics, and computer science inspire systems neuroscience. Seven minimal requirements are outlined for knowledge management systems capable of describing, analyzing, and modeling the basic plan of nervous system circuitry in general, and the plan evolved for vertebrates, for mammals, and ultimately for humans in particular. The goal remains a relatively simple, easy to understand model analogous to the one Harvey elaborated in 1628 for blood circulation in the cardiovascular system. As Cajal wrote in 1909, "To extend our understanding of neural function to the most complex human physiological and psychological activities, it is essential that we first generate a clear and accurate view of the structure of the relevant centers, and of the human brain itself, so that the basic plan--the overview--can be grasped in the blink of an eye."

  10. Military Planning Systems and Stability Operations

    DTIC Science & Technology

    2010-06-01

    should be aware that notwithstanding any other provision of law , no person shall be subject to a penalty for failing to comply with a collection of...ONA and SoSA to be pseudoscience . He further argues that SoSA relies on formal systems analysis and that it should be recognized as the same analyti...show its successes, the Army likely was attracted to SOD by the ability of the Israel Defense Forces (IDF) to engage the Israeli political leadership

  11. Remaining Sites Verification Package for the 1607-F4 Sanitary Sewer System, Waste Site Reclassification Form 2004-131

    SciTech Connect

    L. M. Dittmer

    2007-12-03

    The 1607-F4 waste site is the former location of the sanitary sewer system that serviced the former 115-F Gas Recirculation Building. The system included a septic tank, drain field, and associated pipeline that were in use from 1944 to 1965. The 1607-F4 waste site received unknown amounts of sanitary sewage from the 115-F Gas Recirculation Building and may have potentially contained hazardous and radioactive contamination. In accordance with this evaluation, the verification sampling results support a reclassification of this site to Interim Closed Out. The results of verification sampling demonstrated that residual contaminant concentrations do not preclude any future uses and allow for unrestricted use of shallow zone soils. The results also showed that residual contaminant concentrations are protective of groundwater and the Columbia River.

  12. Application of a reflectance model to the sensor planning system

    NASA Astrophysics Data System (ADS)

    Koutecký, Tomáś; Paloušek, David; Brandejs, Jan

    2015-05-01

    This study describes a new sensor planning system for the automatic generation of scanning positions based on a computer model of the part for digitization of sheet metal parts. The focus of this paper is in the application of a reflectance model into this sensor planning system. The goal of this sensor planning system and application of this model is to ensure fast, complete and accurate digitization of the parts for their inspection during serial-line production, especially in the automotive industry. A methodology of the sensor planning system consists of positions planning, their simulation for true visibility of the part elements using a reflectance model, and a simulation of the positions for robot reachability. Compared to previous studies, visual properties of the scanned parts' surface can be simulated precisely. The Nayar model is used as a reflectance model. This model is suitable for materials that are characterized by the combination of diffuse and specular reflections and uses three components of reflection: diffuse, specular lobe and specular spike. Results of the scanning that were obtained using an ATOS III Triple Scan fringe projection 3D scanner and a KUKA KR 60 HA industrial robot were compared to the simulation. The comparison based on the correspondence of the polygons area acquired in each sensor position (in simulation and in scanning) shows that in the performed measurements the median of differences between simulation and scanning is around 16%.

  13. Test, Control and Monitor System (TCMS) operations plan

    NASA Technical Reports Server (NTRS)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  14. Sandia National Laboratories, California sewer system management plan.

    SciTech Connect

    Holland, Robert C.

    2010-02-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Site Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan. Elements of this Plan are under development in accordance with the SWRCB's schedule.

  15. 300 Area waste acid treatment system closure plan

    SciTech Connect

    LUKE, S.N.

    1999-05-17

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOERL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion includes closure plan documentation submitted for individual, treatment, storage, and/or disposal units undergoing closure, such as the 300 Area Waste Acid Treatment System. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Whenever appropriate, 300 Area Waste Acid Treatment System documentation makes cross-reference to the General Information Portion, rather than duplicating text. This 300 Area Waste Acid Treatment System Closure Plan (Revision 2) includes a Hanford Facility Dangerous Waste Permit Application, Part A, Form 3. Information provided in this closure plan is current as of April 1999.

  16. Massively parallel support for a case-based planning system

    NASA Technical Reports Server (NTRS)

    Kettler, Brian P.; Hendler, James A.; Anderson, William A.

    1993-01-01

    Case-based planning (CBP), a kind of case-based reasoning, is a technique in which previously generated plans (cases) are stored in memory and can be reused to solve similar planning problems in the future. CBP can save considerable time over generative planning, in which a new plan is produced from scratch. CBP thus offers a potential (heuristic) mechanism for handling intractable problems. One drawback of CBP systems has been the need for a highly structured memory to reduce retrieval times. This approach requires significant domain engineering and complex memory indexing schemes to make these planners efficient. In contrast, our CBP system, CaPER, uses a massively parallel frame-based AI language (PARKA) and can do extremely fast retrieval of complex cases from a large, unindexed memory. The ability to do fast, frequent retrievals has many advantages: indexing is unnecessary; very large case bases can be used; memory can be probed in numerous alternate ways; and queries can be made at several levels, allowing more specific retrieval of stored plans that better fit the target problem with less adaptation. In this paper we describe CaPER's case retrieval techniques and some experimental results showing its good performance, even on large case bases.

  17. The 30/20 GHz flight experiment system, phase 2. Volume 4: Experiment system development plan

    NASA Technical Reports Server (NTRS)

    Bronstein, L.; Kawamoto, Y.; Riberich, J. J.; Scope, J. R.; Forman, B. J.; Bergman, S. G.; Reisenfeld, S.

    1981-01-01

    The development plan for the 30/20 GHz flight experiment system is presented. A master program schedule with detailed development plans for each subsystem is planned with careful attention given to how technology items to ensure a minimal risk. The work breakdown structure shows the organization of the program management with detailed task definitions. The ROM costs based on the development plan are also given.

  18. Plan for SEPTA's regional metrorail system. Final report

    SciTech Connect

    Vuchic, V.R.; Kikuchi, S.; Bruun, E.C.; Chakroborty, P.; Krstanoski, N.

    1993-04-01

    SEPTA's Regional Rail System has an extensive network of 7 diametrical lines. However, its ridership is only 90,000 per weekday, much lower than the riderships of the recently built regional metrorail systems, such as BART and WMATA. The project developed a plan to upgrade SEPTA's Regional System by construction of high platforms, purchasing new rolling stock and introduction of self-service fare collection. The report represents a plan for upgrading an old commuter rail system, which has high operating costs and cannot attract many passengers because of long headways, into a modern regional metrorail system which will offer better service with decreased operating costs. This upgrading will have a very positive impact on the entire Philadelphia Region. The required investment, although large in absolute terms, is very moderate compared to the investments made by other cities into rail systems with far smaller networks.

  19. Integrated Renewable Hydrogen Utility System (IRHUS) business plan

    SciTech Connect

    1999-03-01

    This business plan is for a proposed legal entity named IRHUS, Inc. which is to be formed as a subsidiary of Energy Partners, L.C. (EP) of West Palm Beach, Florida. EP is a research and development company specializing in hydrogen proton exchange membrane (PEM) fuel cells and systems. A fuel cell is an engine with no moving parts that takes in hydrogen and produces electricity. The purpose of IRHUS, Inc. is to develop and manufacture a self-sufficient energy system based on the fuel cell and other new technology that produces hydrogen and electricity. The product is called the Integrated renewable Hydrogen utility System (IRHUS). IRHUS, Inc. plans to start limited production of the IRHUS in 2002. The IRHUS is a unique product with an innovative concept in that it provides continuous electrical power in places with no electrical infrastructure, i.e., in remote and island locations. The IRHUS is a zero emissions, self-sufficient, hydrogen fuel generation system that produces electricity on a continuous basis by combining any renewable power source with hydrogen technology. Current plans are to produce a 10 kilowatt IRHUS MP (medium power). Future plans are to design and manufacture IRHUS models to provide power for a variety of power ranges for identified attractive market segments. The technological components of the IRHUS include an electrolyzer, hydrogen and oxygen storage subsystems, fuel cell system, and power control system. The IRHUS product is to be integrated with a variety of renewable energy technologies. 5 figs., 10 tabs.

  20. Engineering work plan tank farm lightning mitigation system

    SciTech Connect

    Jones, F.M., Fluor Daniel Hanford

    1997-02-10

    This Engineering Work Plan defines the scope, function and design criteria, and installation activities that will be provided in support of the Tank Farm Lightning Mitigation System. The Tank Farm Lightning Mitigation System is comprised of two tasks, the light pole air terminal design and the tank riser bonding design. Air terminals, riser and riser flange bonding system will be designed and installed to mitigate the effect of lightning strikes in single shell tank farms with watchlist tanks.

  1. ATIPS: Automatic Travel Itinerary Planning System for Domestic Areas

    PubMed Central

    2016-01-01

    Leisure travel has become a topic of great interest to Taiwanese residents in recent years. Most residents expect to be able to relax on a vacation during the holidays; however, the complicated procedure of travel itinerary planning is often discouraging and leads them to abandon the idea of traveling. In this paper, we design an automatic travel itinerary planning system for the domestic area (ATIPS) using an algorithm to automatically plan a domestic travel itinerary based on user intentions that allows users to minimize the process of trip planning. Simply by entering the travel time, the departure point, and the destination location, the system can automatically generate a travel itinerary. According to the results of the experiments, 70% of users were satisfied with the result of our system, and 82% of users were satisfied with the automatic user preference learning mechanism of ATIPS. Our algorithm also provides a framework for substituting modules or weights and offers a new method for travel planning. PMID:26839529

  2. Task planning with uncertainty for robotic systems. Thesis

    NASA Technical Reports Server (NTRS)

    Cao, Tiehua

    1993-01-01

    In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft

  3. Hanford Action Tracking System release planning support documents

    SciTech Connect

    Keasling, R.

    1995-05-05

    This document contains impacts, plans, resource requirements, schedules, and documents to ensure the conduct of activities for the operation of the Hanford Action Tracking System (HATS). Each discrete topic in this document applies to a specific area of management and team interaction. These formally establish the planning, resources, documentation, and training responsibilities for the system management team. This document is composed of four appendices. These include the following: (1) organization impacts and implementation plan--expected organizational impacts resulting from setting up the new support system for the HATS, the plan to address each of these impacts and other system implementation requirements; (2) training and information requirements--training and information needed to use and operate the HATS; (3) operation/maintenance resources--resources required to maintain and operate the HATS once the system becomes operations; (4) training package--HATS implementation training needs, includes a training procedure, the environment for training users (tools and materials required for the facility, trainer, and trainee); schedule, and handout materials and forms to be completed at the time of training.

  4. Basic Concepts Required in the Development of a Planning Information System.

    ERIC Educational Resources Information Center

    Kennedy, F. D.

    This report, the result of developmental research on a planning information system for North Carolina, describes the planning process at higher levels of State government, defines a general information system and derives a planning information system from various types of planning, provides guidelines for system design and evaluation, and…

  5. Future operational plans for the National Space Transportation System

    NASA Technical Reports Server (NTRS)

    Neubauer, C. H., Jr.

    1986-01-01

    In March 1985, the NASA/DOD Space Transportation System Master Plan was published. This document establishes objectives and plans for operating the Space Transportation System (STS) for the next decade. In the present paper, some key points are discussed, and the significance of the weather forecasting capability is indicated. The STS is to become fully operational by the later 1980's and is to support fully the national needs into the mid-1990's. Attention is given to NASA/DOD STS coordination, NASA/DOD STS Master Plan Traffic Models, the Orbiter Launch-Rate Capability, Launch-Rate Capabilities for Shuttle Processing Facilities at Kennedy Space Center, and Launch-Rate Capabilities for Shuttle Processing Facilities at Vandenberg Air Force Base.

  6. Incorporating energy planning into health systems planning. Technical Assistance Memo-68

    SciTech Connect

    Brinckerhoff, P.

    1980-10-01

    Although energy contingency planning is not presently a Federal priority, Health Systems Agencies (HSAs) should anticipate and plan for the potentially devastating effects of energy shortages. Considerations include travel to and from health services and facilities when gasoline costs are high and gasoline is rationed; growing independence from traditional primary and acute care and awareness of preventive medicine; potential effects on the mental health of Americans, and maintenance of home services. Planners should advise that new facilities be located within convenient distance to other community services. Planners should consult other government and health-related entities interested in energy conservation or which may be seriously affected by a shortage. Energy-related goals and objectives should be included in the health systems plan (HSP) and every community should have an energy contingency plan. The HSA can put energy efficiency criteria and standards in the HSP for each type of service, can help hospitals and nursing homes evaluate and improve energy efficiency, and can use the media and numerous consumer and provider groups to raise the public's awareness of the topic. If HSAs can become energy advocates, they may stand a better chance of continuing as viable, useful, and productive entities.

  7. MINERVA-a multi-modal radiation treatment planning system.

    PubMed

    Wemple, C A; Wessol, D E; Nigg, D W; Cogliati, J J; Milvich, M L; Frederickson, C; Perkins, M; Harkin, G J

    2004-11-01

    Researchers at the Idaho National Engineering and Environmental Laboratory and Montana State University have undertaken development of MINERVA, a patient-centric, multi-modal, radiation treatment planning system. This system can be used for planning and analyzing several radiotherapy modalities, either singly or combined, using common modality independent image and geometry construction and dose reporting and guiding. It employs an integrated, lightweight plugin architecture to accommodate multi-modal treatment planning using standard interface components. The MINERVA design also facilitates the future integration of improved planning technologies. The code is being developed with the Java Virtual Machine for interoperability. A full computation path has been established for molecular targeted radiotherapy treatment planning, with the associated transport plugin developed by researchers at the Lawrence Livermore National Laboratory. Development of the neutron transport plugin module is proceeding rapidly, with completion expected later this year. Future development efforts will include development of deformable registration methods, improved segmentation methods for patient model definition, and three-dimensional visualization of the patient images, geometry, and dose data. Transport and source plugins will be created for additional treatment modalities, including brachytherapy, external beam proton radiotherapy, and the EGSnrc/BEAMnrc codes for external beam photon and electron radiotherapy.

  8. A scientific operations plan for the NASA space telescope. [ground support systems, project planning

    NASA Technical Reports Server (NTRS)

    West, D. K.; Costa, S. R.

    1975-01-01

    A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.

  9. The Role of Information System for Education Planning and Management.

    ERIC Educational Resources Information Center

    Kumsa, Gabeyehu

    This report details how Ethiopia's Ministry of Education has met the challenges of the information age by investing in computer technology to plan and manage an education management information system (EMIS) in hopes of closing the widening technological gap between itself and other industrialized nations. The major objective for the EMIS is to…

  10. Building Robust Planning and Execution Systems for Virtual Worlds

    DTIC Science & Technology

    2006-01-01

    must monitor the moment to moment context in which it acts ( Geib 1994). As Geib points out, there are two successful methods for doing this. One is...of theorem proving to problem solving. Artificial Intelligence, 2:189-208. Geib , C. 1994. The Intentional Planning System: Itplans. In

  11. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  12. Chief of Naval Air Training Resource Planning System (RPS).

    ERIC Educational Resources Information Center

    Hodak, Gary W.; And Others

    The Resource Planning System (RPS) provides the Chief of Naval Air Training (CNATRA) with the capability to determine the resources required to produce a specified number of Naval Aviators and Naval Flight Officers (NAs/NFOs) quickly and efficiently. The training of NAs and NFOs is extremely time consuming and complex. It requires extensive…

  13. The Role of Information System for Education Planning and Management.

    ERIC Educational Resources Information Center

    Kumsa, Gabeyehu

    This report details how Ethiopia's Ministry of Education has met the challenges of the information age by investing in computer technology to plan and manage an education management information system (EMIS) in hopes of closing the widening technological gap between itself and other industrialized nations. The major objective for the EMIS is to…

  14. Beyond Permanency Planning: Restructuring the Public Child Welfare System.

    ERIC Educational Resources Information Center

    Pelton, Leroy H.

    1991-01-01

    Contends that, examined in terms of its outcomes, permanency planning movement has failed. Argues that movement has failed mainly because of its lack of impact on provision of preventive and supportive services and because of its superimposition on child welfare system with dysfunctional structure in regard to prevention. Proposes fundamental…

  15. Operating Plan for Distance Education at Houston Community College System.

    ERIC Educational Resources Information Center

    Houston Community Coll. System, TX. Office of Institutional Research.

    Outlines an operating plan for the Houston Community College System Distance Education Department. The report begins with a brief historical overview of the department and introduces the mission and members of 1999 Task Force on Distance Education and the 2001 Distance Education Faculty Curriculum Committee. The authors also highlight significant…

  16. Education in Transportation Systems Planning: Highway Research Record No. 462.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Transportation Research Board.

    The papers contained in the issue of Highway Research Record focus on current and emerging patterns of education and training related to transportation systems planning. The five papers are: Transportation Centers and Other Mechanisms to Encourage Interdisciplinary Research and Training Efforts in Transportation (Frederick J. Wegmann and Edward A.…

  17. Plan for Reforming Beijing University's Engagements and Promotions System

    ERIC Educational Resources Information Center

    Chinese Education and Society, 2005

    2005-01-01

    This article reports about the plan for reforming Beijing university's engagements and promotion system. The leadership of Beijing University conducted in-depth deliberations on the university's work of building up its faculty contingent in light of the aim of establishing a world-class university and the situation and tasks faced in the current…

  18. Strategic Planning: A New Role for Management Information Systems.

    ERIC Educational Resources Information Center

    Groff, Warren H.

    In the past management information systems (MIS) have focused on data relating to the internal operations of the institution (e.g., registration and space utilization). Recently, however, strategic planning as a means of establishing long-range goals is becoming increasingly dependent upon data external to the institution, such as demographics and…

  19. IET exhaust gas duct, system layout, plan, and section. shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    IET exhaust gas duct, system layout, plan, and section. shows mounting brackets, concrete braces, divided portion of duct, other details. Ralph M. Parsons 902-5-ANP-712-S 429. Date: May 1954. Approved by INEEL Classification Office for public release. INEEL index code no. 035-0712-60-693-106980 - Idaho National Engineering Laboratory, Test Area North, Scoville, Butte County, ID

  20. Strategic Planning for DFAS-Cleveland Expert Systems

    DTIC Science & Technology

    1991-03-01

    strategic planning. Our investigative approach utilizes questionnaires, coupled with an extensive literature review of current books, periodicals, articles ... telecomunication and data transfer protocols are needed for effective interfacing between micro and mainframe in order to convert stand alone micro...conferences continually stress a need for the ability to integrate expert systems into the business environment. However, few articles offer any description of

  1. From Training to Learning in Enterprise Resource Planning Systems

    ERIC Educational Resources Information Center

    Kerr, Don; Murray, Peter A.; Burgess, Kevin

    2012-01-01

    The information systems' literature outlines how training is a critical factor to successful Enterprise Resource Planning (ERP) implementations. Yet, types of training are not discussed in the literature and there is little indication if existing training is effective and whether relevant contextual factors have been considered. Without…

  2. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  3. Search Hanford accessible reports electronically system configuration management plan

    SciTech Connect

    White, E.L.

    1995-01-01

    This Software Configuration Management Plan (SCMP) provides the requirements for control of the Search Hanford Accessible Reports Electronically (SHARE) software and documentation. The SHARE system consists of the TOPIC Text Search and Retrieval software and the programs necessary to extract information from other sources to be placed in SHARE.

  4. Nursing Classification System: Foundation for Personnel Planning and Control.

    ERIC Educational Resources Information Center

    Dale, Rosemary L.; Mable, Richard J.

    1983-01-01

    This article demonstrates the usefulness of the Nursing Classification System (NCS) as an operational planning and control tool. Here the authors introduce and illustrate the concept of workload indexing, a means by which the NCS assists in defining staffing needs and monitoring workload and performance. (SSH)

  5. Planning and Implementing an Integrated Document Management System.

    ERIC Educational Resources Information Center

    Hendley, Tony

    1995-01-01

    Discusses points to consider when planning and implementing an integrated document management system: (1) background; (2) scoping the project; (3) strategic issues; (4) options review; (5) functional requirements; (6) technical requirements; (7) cost benefit analysis; (8) standard operational requirement checklist; (9) evaluation criteria; and…

  6. Planning for climate change on the National Wildlife Refuge System

    Treesearch

    B. Czech; S. Covington; T. M. Crimmins; J. A. Ericson; C. Flather; M. Gale; K. Gerst; M. Higgins; M. Kaib; E. Marino; T. Moran; J. Morton; N. Niemuth; H. Peckett; D. Savignano; L. Saperstein; S. Skorupa; E. Wagener; B. Wilen; B. Wolfe

    2014-01-01

    This document originated in 2008 as a collaborative project of the U.S. Fish and Wildlife Service (FWS) and the University of Maryland's Graduate Program in Sustainable Development and Conservation Biology. The original title was A Primer on Climate Change for the National Wildlife Refuge System. The Primer has evolved into Planning for Climate Change on the...

  7. Security administration plan for HANDI 2000 business management system

    SciTech Connect

    Wilson, D.

    1998-09-29

    This document encompasses and standardizes the integrated approach for security within the PP and Ps applications, It also identifies the security tools and methods to be used. The Security Administration Plan becomes effective as of this document`s acceptance and will provide guidance through implementation efforts and, as a ``living document`` will support the operations and maintenance of the system.

  8. Urban Transportation Planning Short Course: Evaluation of Alternative Transportation Systems.

    ERIC Educational Resources Information Center

    Federal Highway Administration (DOT), Washington, DC.

    This urban transportation pamphlet delves into the roles of policy groups and technical staffs in evaluating alternative transportation plans, evaluation criteria, systems to evaluate, and evaluation procedures. The introduction admits the importance of subjective, but informed, judgment as an effective tool in weighing alternative transportation…

  9. Systems analysis in land-use planning... a conceptual development

    Treesearch

    Ronald A. Oliveira

    1973-01-01

    A planning model in which social, economic, and environmental constraints are specified--especially in mathematical form--can be helpful in decisionmaking. The general structure of a land-use decision model approached through systems analysis is described. The proposed procedures emphasize the quantification of interrelationships between uses and the specification of...

  10. Strategic business planning and development for competitive health care systems.

    PubMed

    Nauert, Roger C

    2005-01-01

    The health care industry has undergone enormous evolutionary changes in recent years. Competitive transitions have accelerated the compelling need for aggressive strategic business planning and dynamic system development. Success is driven by organizational commitments to farsighted market analyses, timely action, and effective management.

  11. Quest for the basic plan of nervous system circuitry

    PubMed Central

    Swanson, Larry W.

    2007-01-01

    The basic plan of nervous system organization has been investigated since classical antiquity. The first model centered on pneumas pumped from sensory nerves through the ventricular system and out motor nerves to muscles. It was popular well into the seventeenth century and diverted attention from the organization of brain parenchyma itself. Willis focused on gray matter production and white matter conduction of pneumas in 1664, and by the late nineteenth century a clear cellular model of nervous system organization based on sensory, motor, and association neuron classes transmitting nerve impulses was elaborated by Cajal and his contemporaries. Today, revolutionary advances in experimental pathway tracing methods, molecular genetics, and computer science inspire systems neuroscience. Seven minimal requirements are outlined for knowledge management systems capable of describing, analyzing, and modeling the basic plan of nervous system circuitry in general, and the plan evolved for vertebrates, for mammals, and ultimately for humans in particular. The goal remains a relatively simple, easy to understand model analogous to the one Harvey elaborated in 1628 for circulation in the cardiovascular system. As Cajal wrote in 1909, “To extend our understanding of neural function to the most complex human physiological and psychological activities, it is essential that we first generate a clear and accurate view of the structure of the relevant centers, and of the human brain itself, so that the basic plan—the overview—can be grasped in the blink of an eye.” PMID:17267046

  12. Planning and Processing Space Science Observations Using NASA's SPICE System

    NASA Technical Reports Server (NTRS)

    Acton, Charles H.

    2000-01-01

    The Navigation and Ancillary Information Facility (NAIF) team, acting under the directions of NASA's Office of Space Science, has built a data system-named SPICE, to assist scientists in planning and interpreting scientific observations from space-borne instruments. The principal objective of this data system is that it will provide geometric and other ancillary data used to plan space science missions and subsequently recover the full value of science instrument data returned from these missions, including correlation of individual instrument data sets with data from other instruments on the same or other spacecraft. SPICE is also used to support a host of mission engineering functions, such as telecommunications system analysis and operation of NASA's Deep Space Network antennas. This paper describes the SPICE system, including where and how it is used. It also touches on possibilities for further development and invites participation it this endeavor.

  13. Planning for environmental constraints on the PJM system

    SciTech Connect

    Not Available

    1994-07-15

    This chapter provides a snapshot of the existing PJM system and identifies the environmental constraints that form the parameters for the regional approaches analyzed in this study. The chapter begins with a description of the PJM system and the costs and emissions levels of the pollutants under study associated with the reference case (the PJM system configured to meet only Clean Air Act Amendment Phase I SO{sub 2} requirements and the March 1994 NO{sub x} requirements affecting Phase I units){sup 3}. Next, the pollution-reduction scenario assumed for the purpose of the study, which covers the period 1995--2010, is described. Finally, the impacts of this pollution reduction scenario -- emissions that would need to be avoided on the reference case PJM system -- are identified. Modeling methods are described alongside the study`s results. Other chapters discuss: environmental constraints, alternate plans to achieve environmental goals, and comparison of alternate plans.

  14. Progress and Plans for a US Laser System for LISA

    NASA Astrophysics Data System (ADS)

    Camp, J.; Numata, K.; Krainak, M.

    2017-05-01

    A highly stable and robust laser system is a key component of the space-based LISA mission architecture. We describe our progress and plans to demonstrate a TRL 5 LISA laser system at Goddard Space Flight Center by 2020. The laser system includes a low-noise oscillator followed by a power fiber amplifier. The oscillator is a low-mass, compact external cavity laser, consisting of a semiconductor laser coupled to an optical cavity, built by the laser vendor Redfern Integrated Optics. The amplifier is a diode-pumped Yb fiber with 2.5 W output, built at Goddard. We show noise and reliability data for the full laser system, and describe our plans to reach TRL 5.

  15. Tank waste remediation system multi-year work plan

    SciTech Connect

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  16. Tank waste remediation system multi-year work plan

    SciTech Connect

    Not Available

    1994-09-01

    The Tank Waste Remediation System (TWRS) Multi-Year Work Plan (MYWP) documents the detailed total Program baseline and was constructed to guide Program execution. The TWRS MYWP is one of two elements that comprise the TWRS Program Management Plan. The TWRS MYWP fulfills the Hanford Site Management System requirement for a Multi-Year Program Plan and a Fiscal-Year Work Plan. The MYWP addresses program vision, mission, objectives, strategy, functions and requirements, risks, decisions, assumptions, constraints, structure, logic, schedule, resource requirements, and waste generation and disposition. Sections 1 through 6, Section 8, and the appendixes provide program-wide information. Section 7 includes a subsection for each of the nine program elements that comprise the TWRS Program. The foundation of any program baseline is base planning data (e.g., defendable product definition, logic, schedules, cost estimates, and bases of estimates). The TWRS Program continues to improve base data. As data improve, so will program element planning, integration between program elements, integration outside of the TWRS Program, and the overall quality of the TWRS MYWP. The MYWP establishes the TWRS baseline objectives to store, treat, and immobilize highly radioactive Hanford waste in an environmentally sound, safe, and cost-effective manner. The TWRS Program will complete the baseline mission in 2040 and will incur costs totalling approximately 40 billion dollars. The summary strategy is to meet the above objectives by using a robust systems engineering effort, placing the highest possible priority on safety and environmental protection; encouraging {open_quotes}out sourcing{close_quotes} of the work to the extent practical; and managing significant but limited resources to move toward final disposition of tank wastes, while openly communicating with all interested stakeholders.

  17. Electromagnetic induction moisture measurement system acceptance test plan

    SciTech Connect

    Vargo, G.F., Westinghouse Hanford

    1996-08-01

    The purpose of this acceptance test plan (ATP) is to verify that the mechanical, electrical and software features of the ElectroMagnetic Induction (EMI) probe are operating as designed,and that the unit is ready for field service. The accepted EMI and Surface Moisture Measurement Systems (SMMS) will be used primarily in support of Tank Waste Remediation System (TWRS) Safety Programs for moisture measurement of organic and ferrocyanide watch list tanks.

  18. Ground Systems Development Environment (GSDE) interface requirements and prototyping plan

    NASA Technical Reports Server (NTRS)

    Church, Victor E.; Philips, John; Bassman, Mitchell; Williams, C.

    1990-01-01

    This report describes the data collection and requirements analysis effort of the Ground System Development Environment (GSDE) Interface Requirements study. It identifies potential problems in the interfaces among applications and processors in the heterogeneous systems that comprises the GSDE. It describes possible strategies for addressing those problems. It also identifies areas for further research and prototyping to demonstrate the capabilities and feasibility of those strategies and defines a plan for building the necessary software prototypes.

  19. Public engagement and the changing face of health system planning.

    PubMed

    Grant, John; Sears, Nancy A; Born, Karen

    2008-01-01

    This paper examines the impact of the emerging citizens' assembly model of public engagement on health system planning and management. The characteristics that distinguish this model from more traditional approaches such as surveys and town hall meetings are elaborated using the case study of the recent Citizens' Regional Health Assembly. The paper concludes by suggesting the possibility of a new type of relationship between health system decision-makers, providers and the community.

  20. Lessons learned in systems thinking approach for evaluation planning.

    PubMed

    Williams, John C; Costich, Julia; Hacker, William D; Davis, James S

    2010-01-01

    The role of systems thinking is addressed in the context of a public health department-academic collaboration to plan the evaluation of a learning management system. Findings suggest new directions for public health practitioners and researchers who are responsible for ensuring that public health workforce training efforts, and other programs and services, have the intended impact on public health workers' competence and the public's health.

  1. Program plan for EMP survivability of Navy C2 systems

    SciTech Connect

    Latorre, V.R.; Greenwell, R.A.

    1986-08-01

    This report provides a plan for implementing the Navy Tactical C2 EMP Survivability Program. This program will emphasize the development of EMP standards and specifications for all phases of a C2 system's life from its concept formulation phase through its total in service life. In order to achieve an EMP survivable Navy C2 system, the US Navy must develop a program that will provide appropriate guidance and direction.

  2. Configuration management program plan for Hanford site systems engineering

    SciTech Connect

    Hoffman, A.G.

    1994-11-14

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.

  3. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  4. flexplan: Mission Planning System for the Lunar Reconnaissance Orbiter

    NASA Technical Reports Server (NTRS)

    Barnoy, Assaf; Beech, Theresa

    2013-01-01

    flexplan is a mission planning and scheduling (MPS) tool that uses soft algorithms to define mission scheduling rules and constraints. This allows the operator to configure the tool for any mission without the need to modify or recompile code. In addition, flexplan uses an ID system to track every output on the schedule to the input from which it was generated. This allows flexplan to receive feedback as the schedules are executed, and update the status of all activities in a Web-based client. flexplan outputs include various planning reports, stored command loads for the Lunar Reconnaissance Orbiter (LRO), ephemeris loads, and pass scripts for automation.

  5. A Decision Support System for Manpower Planning (Een Beslissingsondersteunend Systeem voor Personeels-Planning

    DTIC Science & Technology

    1990-10-01

    over bet feitelijke ge- bruik van bet beslissingsondersteunende systeem . TNO report Page 4 ABSTRACT 2 SAMENVATTING 3 CONTENTS 4 SURVEY OF FIGURES 5 1...manpower planning and policy analysis. We describe the decision making context in which the system can be used and give a survey of its contents and its...Availability Codes Avail and/or Dist Speoial 7NO report Page 3 rapport no. FEL-90-B300 titel Een beslissingsondersteunend systeem voor personeels

  6. Evolution of the Air Campaign Planning Process and the Contingency Theater Automated Planning System (CTAPS),

    DTIC Science & Technology

    1996-01-01

    Intelligence Division CIM Corporate Information Management CINCCENT Commander in Chief, Central Command CIO Central Imagery Office CIS Combat...obtaining, deconflicting, and properly in- corporating order of battle and bomb damage assessment information into the ATO planning process. There were...Karyl, Open Systems Today, "OpenDoc: New Take on Object Technology," 1 August 1994. Soderholm, Steve, Captain, CTAPS Communicatins Connectivity of

  7. Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems

    NASA Astrophysics Data System (ADS)

    1993-07-01

    Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency utility systems: 60 percent (lower heating value basis); industrial systems--15 percent improvement over today's best gas turbine systems; Environmental superiority (reduced nitrogen oxides (NO(x)), carbon dioxide (CO2), carbon monoxide (CO), and unburned hydrocarbons (UHC)); and cost competitiveness (10 percent lower cost of electricity). This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share, and an approximate $250 million cost-share by industrial participants.

  8. Report to Congress: Comprehensive Program Plan for Advanced Turbine Systems

    SciTech Connect

    Not Available

    1993-07-01

    Consistent with the Department of Energy (DOE) mission, the Advanced Turbine Systems (ATS) Program will develop more efficient gas turbine systems for both utility and industrial electric power generation (including cogeneration). The Program will develop base-load power systems for commercial offering in the year 2000. Although the target fuel is natural gas, the ATS will be adaptable to coal and biomass firing. All ATS will exhibit these characteristics: Ultra-high efficiency [utility systems: 60 percent (lower heating value basis); industrial systems: 15 percent improvement over today`s best gas turbine systems]; Environmental superiority [reduced nitrogen oxides (NO{sub x}), carbon dioxide (CO{sub 2}), carbon monoxide (CO), and unburned hydrocarbons (UHC)]; and Cost competitiveness [10 percent lower cost of electricity]. This Program Plan was requested in the House, Senate, and Conference Reports on the FY 1993 Interior and Related Agencies Appropriations Act, Public Law 102--381, and is consistent with the Energy Policy Act of 1992, which (in Section 2112) identifies work for improving gas turbines. This plan outlines the 8-year ATS Program and discusses rationale and planning. Total Program costs are estimated to be $700 million, consisting of an approximate $450 million government share and an approximate $250 million cost-share by industrial participants.

  9. Planning In A Hierarchical Nested Autonomous Control System

    NASA Astrophysics Data System (ADS)

    Meystel, A.

    1987-02-01

    In this paper, theoretical foundations of planning processes are outlined in a form applicable for design and control of autonomous mobile robots. Planning/control is shown to be a unified recursive operation of decision making applied to a nested hierarchy of knowledge representation. The core of the theory is based upon methods developed in the areas of Post-production systems, theory of coding, and the team theory of decentralized stochastic control. A class of autonomous control systems for robots is defined, and a problem of information representation is addressed for this class. A phenomenon of nesting is analyzed and the minimum c-entropy rule is determined for arranging efficient design and control procedures for systems of intelligent control. A concept of nested hierarchical knowledge-based controller is employed in this paper which enables minimum-time control using nested dynamic programming. An application of this concept is unfolded for a system of knowledge-based control of an autonomous mobile robot. Key words: Autonomous Control Systems, Decision Making, Production Systems, Decentralized Stochastic Control, Dynamic Programming, Hierarchical Control, Knowledge Based Controllers, E-entropy, Planning, Navigation, Guidance, Prediction, Contingencies, Mobile Robots.

  10. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans.

    PubMed

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-08-03

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3

  11. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans

    PubMed Central

    2013-01-01

    Background The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. Methods We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. Results It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5

  12. Martin Marietta Energy Systems, Inc., Groundwater Program Management Plan

    SciTech Connect

    Early, T.O.

    1994-05-01

    The purpose of the Martin Marietta Energy Systems, Inc., (Energy Systems) Groundwater Program Management Plan is to define the function, organizational structure (including associated matrix organizations), interfaces, roles and responsibilities, authority, and relationship to the Department of Energy for the Energy Systems Groundwater Program Office (GWPO). GWPO is charged with the responsibility of coordinating all components of the groundwater program for Energy Systems. This mandate includes activities at the three Oak Ridge facilities [Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, and the Oak Ridge K-25 Site], as well as the Paducah and Portsmouth Gaseous Diffusion Plants.

  13. SERA - An Advanced Treatment Planning System for Neutron Therapy

    SciTech Connect

    C. A. Wemple; C. L. Albright; D. W. Nigg; D. W. Wessol; F. J. Wheeler; G. J. Harkin; M. B. Rossmeirer; M. T. Cohen; M. W. Frandsen

    1999-06-01

    The technology for computational dosimetry and treatment planning for Boron Neutron Capture Therapy (BNCT) has advanced significantly over the past few years. Because of the more complex nature of the problem, the computational methods that work well for treatment planning in photon radiotherapy are not applicable to BNCT. The necessary methods have, however, been developed and have been successfully employed both for research applications as well as human trials. Computational geometry for BNCT applications can be constructed directly from tomographic medical imagery and computed radiation dose distributions can be readily displayed in formats that are familiar to the radiotherapy community. The SERA system represents a significant advance in several areas for treatment planning. However further improvements in speed and results presentation are still needed for routine clinical applications, particularly when optimizations of dose pattern is required.

  14. Savannah River Site Geographic Information System management plan

    SciTech Connect

    Gordon, D.E.

    1992-02-01

    A plan for managing the development of Geographic Information System (GIS) applications at the Savannah River Site (SRS) in a coordinated, integrated fashion has been developed. Included in the plan are discussions on the guidance for GIS activities at the site, the overall strategy for managing GIS applications development, the specific administrative and programmatic tasks with projected completion schedules, and the organizational structure in place to direct this GIS effort. The Department of Energy-Savannah River Field Office (DOE-SR) has encouraged all primary subcontracting organizations at SRS involved with the mapping of spatial data to coordinate their efforts and be more cost effective. This plan provides a description of organized activities in 1992 for establishing a coordinated approach for developing and implementing GIS technology.

  15. Workforce planning and development in times of delivery system transformation.

    PubMed

    Pittman, Patricia; Scully-Russ, Ellen

    2016-09-23

    As implementation of the US Affordable Care Act (ACA) advances, many domestic health systems are considering major changes in how the healthcare workforce is organized. The purpose of this study is to explore the dynamic processes and interactions by which workforce planning and development (WFPD) is evolving in this new environment. Informed by the theory of loosely coupled systems (LCS), we use a case study design to examine how workforce changes are being managed in Kaiser Permanente and Montefiore Health System. We conducted site visits with in-depth interviews with 8 to 10 stakeholders in each organization. Both systems demonstrate a concern for the impact of change on their workforce and have made commitments to avoid outsourcing and layoffs. Central workforce planning mechanisms have been replaced with strategies to integrate various stakeholders and units in alignment with strategic growth plans. Features of this new approach include early and continuous engagement of labor in innovation; the development of intermediary sense-making structures to garner resources, facilitate plans, and build consensus; and a whole system perspective, rather than a focus on single professions. We also identify seven principles underlying the WFPD processes in these two cases that can aid in development of a new and more adaptive workforce strategy in healthcare. Since passage of the ACA, healthcare systems are becoming larger and more complex. Insights from these case studies suggest that while organizational history and structure determined different areas of emphasis, our results indicate that large-scale system transformations in healthcare can be managed in ways that enhance the skills and capacities of the workforce. Our findings merit attention, not just by healthcare administrators and union leaders, but by policymakers and scholars interested in making WFPD policies at a state and national level more responsive.

  16. Soil Management Plan For The Potable Water System Upgrades Project

    SciTech Connect

    Field, S. M.

    2007-04-01

    This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.

  17. Strategic workforce planning for a multihospital, integrated delivery system.

    PubMed

    Datz, David; Hallberg, Colleen; Harris, Kathy; Harrison, Lisa; Samples, Patience

    2012-01-01

    Banner Health has long recognized the need to anticipate, beyond the immediate operational realities or even the annual budgeting projection exercises, the necessary workforce needs of the future. Thus, in 2011, Banner implemented a workforce planning model that included structures, processes, and tools for predicting workforce needs, with particular focus on identified critical systemwide practice areas. The model represents the incorporation of labor management tools and processes with more strategic, broad-view, long-term assessment and planning mechanisms. The sequential tying of the workforce planning lifecycle with the organization's strategy and financial planning process supports alignment of goals, objectives, and resource allocation. Collaboration among strategy, finance, human resources, and operations has provided us with the ability to identify critical position groups based on 3-year strategic priorities. By engaging leaders from across the organization, focusing on activities at facility, regional, and system levels, and building in mechanisms for accountability, we are now engaged in continuous evaluations of our delivery models, the competencies and preparations necessary for the staff to effectively function within those delivery models, and developing and implementing action plans designed to ensure adequate numbers of the staff whose competencies will be suited to the work expected of them.

  18. A Virtual Frame System for Stereotactic Radiosurgery Planning

    SciTech Connect

    Ford, Eric Purger, David; Tryggestad, Erik; McNutt, Todd; Christodouleas, John; Rigamonti, Daniele; Shokek, Ori; Won Sang; Zhou, Jessica; Lim, Michael; Wong, John; Kleinberg, Larry

    2008-11-15

    Purpose: We describe a computerized (or virtual) model of a stereotactic head frame to enable planning prior to the day of radiosurgery. The location of the virtual frame acts as a guide to frame placement on the day of the procedure. Methods and Materials: The software consists of a triangular mesh representation of the essential frame hardware that can be overlaid with any MR scan of the patient and manipulated in three dimensions. The software calculates regions of the head that will actually be accessible for treatment, subject to the geometric constraints of the Leksell Gamma Knife hardware. DICOM-compliant MR images with virtual fiducial markers overlaid onto the image can then be generated for recognition by the treatment planning system. Results: Retrospective evaluation of the software on 24 previously treated patients shows a mean deviation of the position of the virtual frame from the actual frame position of 1.6 {+-} 1.3 mm. Initial clinical use on five patients indicates an average discrepancy of the virtual frame location and the actual frame location of <1 mm. MR images with virtual fiducial markers can be imported into radiosurgical treatment planning software and used to generate an initial treatment plan. Conclusions: The virtual frame provides a tool for prospective determination of lesion accessibility, optimization of the frame placement, and treatment planning before the day of the procedure. This promises to shorten overall treatment times, improve patient comfort, and reduce the need for repeat treatments due to suboptimally placed frames.

  19. Study on Process Planning System for Holonic Manufacturing

    NASA Astrophysics Data System (ADS)

    Rais, Suyoto; Sugimura, Nobuhiro; Kokubun, Atsushi

    New architectures of manufacturing systems have been proposed aiming at realizing more flexible control structures of manufacturing systems which can cope with dynamic changes in volume and variety of products. They are so called as holonic manufacturing systems, autonomous distributed manufacturing systems, random manufacturing systems and biological manufacturing systems. The objective of the present research is to develop an integrated process planning and scheduling system which is applicable to the holonic manufacturing systems. In the previous paper, procedures were proposed to recognize the machining features from the product model. A systematic method is proposed, in this paper, to select suitable machining sequences and sequences of machining equipment, by applying the genetic algorithm (GA) and the dynamic programming (DP) methods.

  20. Technical considerations in planning a distributed teleradiology system.

    PubMed

    Ho, B K; Taira, R K; Steckel, R J; Kangarloo, H

    1995-01-01

    A large-scale teleradiology project is under way to link a Florida imaging center to the UCLA Department of Radiology. The initial goal is to provide Florida patients in a routine clinical practice environment with subspecialty consultation by academic radiologists. The plan then calls for the addition of other domestic and international sites. Technical issues in planning to establish the necessary teleradiology infrastructure include wide area network design, image compression, distributed archiving, and special viewing station features. Special emphasis is placed on archive design that makes intelligent use of information, such as triggering events from the radiological information system (RIS) for image prefetching and visual cues from photo-icons for full-size image retrieval. Concepts such as teleconsultation and remote procedure monitoring are aimed at providing the same level of services at distant sites that would be available in-house. This article highlights the system design parameters that must be considered to engineer a scalable distributed teleradiology system.

  1. Fly-by-light flight control system technology development plan

    NASA Technical Reports Server (NTRS)

    Chakravarty, A.; Berwick, J. W.; Griffith, D. M.; Marston, S. E.; Norton, R. L.

    1990-01-01

    The results of a four-month, phased effort to develop a Fly-by-Light Technology Development Plan are documented. The technical shortfalls for each phase were identified and a development plan to bridge the technical gap was developed. The production configuration was defined for a 757-type airplane, but it is suggested that the demonstration flight be conducted on the NASA Transport Systems Research Vehicle. The modifications required and verification and validation issues are delineated in this report. A detailed schedule for the phased introduction of fly-by-light system components has been generated. It is concluded that a fiber-optics program would contribute significantly toward developing the required state of readiness that will make a fly-by-light control system not only cost effective but reliable without mitigating the weight and high-energy radio frequency related benefits.

  2. Minimizing liability by properly planning UST system upgrades

    SciTech Connect

    Kroon, D.H.; Baach, M.K.

    1995-12-31

    Existing underground storage tank (UST) systems containing regulated substances, including petroleum products, are defined by the Environmental Protection Agency (EPA) as those installed prior to December 22, 1988. Under the federal regulations (40 CFR Parts 280 and 281), these systems must be upgraded to new standards by December 22, 1998 in the areas of spill and overfill prevention, corrosion protection, and leak detection. Properly planned UST system upgrades provide safety and environmental protection plus: compliance with federal regulations; minimum public liability; and reduced insurance premiums. Some modification to this program will be required where state and local regulations are more strict than the federal requirements. Minimizing liability at reduced costs is the key element of the upgrade program. Although the regulatory requirements must be satisfied, the paramount issue is to minimize exposure to public liability. The methodology presented has been demonstrated to economically achieve that very important goal. In a recent case history, a major operator of UST systems adopted this program and was rewarded by his insurance company with over a 50% reduction in premiums for pollution liability insurance. The upgrade program for existing UST systems consists of: general planning; site investigation; specific plan development; implementation; and monitoring and records.

  3. The Design, Planning and Control of Robotic Systems in Space

    NASA Technical Reports Server (NTRS)

    Dubowsky, Steven

    1996-01-01

    In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics.

  4. Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

    NASA Technical Reports Server (NTRS)

    Richardson, J.; Labbe, M.; Belala, Y.; Leduc, Vincent

    1994-01-01

    The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

  5. HELP/PLANTRAN; A Computer Assisted Planning System for Higher Education.

    ERIC Educational Resources Information Center

    Midwest Research Inst., Kansas City, MO.

    Chapter I of this manual for a planning simulation system for higher education presents some basic outlines to aid in the planning process, including the "outline of plans" as a concrete aid to systematic planning. This chapter also identifies some of the typical problems and barriers that hamper the planning process, and conveys the need for a…

  6. HybridPlan: A Capacity Planning Technique for Projecting Storage Requirements in Hybrid Storage Systems

    SciTech Connect

    Kim, Youngjae; Gupta, Aayush; Urgaonkar, Bhuvan; Piotr, Berman; Sivasubramaniam, Anand

    2014-01-01

    Economic forces, driven by the desire to introduce flash into the high-end storage market without changing existing software-base, have resulted in the emergence of solid-state drives (SSDs), flash packaged in HDD form factors and capable of working with device drivers and I/O buses designed for HDDs. Unlike the use of DRAM for caching or buffering, however, certain idiosyncrasies of NAND Flash-based solid-state drives (SSDs) make their integration into hard disk drive (HDD)-based storage systems nontrivial. Flash memory suffers from limits on its reliability, is an order of magnitude more expensive than the magnetic hard disk drives (HDDs), and can sometimes be as slow as the HDD (due to excessive garbage collection (GC) induced by high intensity of random writes). Given the complementary properties of HDDs and SSDs in terms of cost, performance, and lifetime, the current consensus among several storage experts is to view SSDs not as a replacement for HDD, but rather as a complementary device within the high-performance storage hierarchy. Thus, we design and evaluate such a hybrid storage system with HybridPlan that is an improved capacity planning technique to administrators with the overall goal of operating within cost-budgets. HybridPlan is able to find the most cost-effective hybrid storage configuration with different types of SSDs and HDDs

  7. Prototype demonstration of radiation therapy planning code system

    SciTech Connect

    Little, R.C.; Adams, K.J.; Estes, G.P.; Hughes, L.S. III; Waters, L.S.

    1996-09-01

    This is the final report of a one-year, Laboratory-Directed Research and Development project at the Los Alamos National Laboratory (LANL). Radiation therapy planning is the process by which a radiation oncologist plans a treatment protocol for a patient preparing to undergo radiation therapy. The objective is to develop a protocol that delivers sufficient radiation dose to the entire tumor volume, while minimizing dose to healthy tissue. Radiation therapy planning, as currently practiced in the field, suffers from inaccuracies made in modeling patient anatomy and radiation transport. This project investigated the ability to automatically model patient-specific, three-dimensional (3-D) geometries in advanced Los Alamos radiation transport codes (such as MCNP), and to efficiently generate accurate radiation dose profiles in these geometries via sophisticated physics modeling. Modem scientific visualization techniques were utilized. The long-term goal is that such a system could be used by a non-expert in a distributed computing environment to help plan the treatment protocol for any candidate radiation source. The improved accuracy offered by such a system promises increased efficacy and reduced costs for this important aspect of health care.

  8. Integrating operation design into infrastructure planning to foster robustness of planned water systems

    NASA Astrophysics Data System (ADS)

    Bertoni, Federica; Giuliani, Matteo; Castelletti, Andrea

    2017-04-01

    Over the past years, many studies have looked at the planning and management of water infrastructure systems as two separate problems, where the dynamic component (i.e., operations) is considered only after the static problem (i.e., planning) has been resolved. Most recent works have started to investigate planning and management as two strictly interconnected faces of the same problem, where the former is solved jointly with the latter in an integrated framework. This brings advantages to multi-purpose water reservoir systems, where several optimal operating strategies exist and similar system designs might perform differently on the long term depending on the considered short-term operating tradeoff. An operationally robust design will be therefore one performing well across multiple feasible tradeoff operating policies. This work aims at studying the interaction between short-term operating strategies and their impacts on long-term structural decisions, when long-lived infrastructures with complex ecological impacts and multi-sectoral demands to satisfy (i.e., reservoirs) are considered. A parametric reinforcement learning approach is adopted for nesting optimization and control yielding to both optimal reservoir design and optimal operational policies for water reservoir systems. The method is demonstrated on a synthetic reservoir that must be designed and operated for ensuring reliable water supply to downstream users. At first, the optimal design capacity derived is compared with the 'no-fail storage' computed through Rippl, a capacity design function that returns the minimum storage needed to satisfy specified water demands without allowing supply shortfall. Then, the optimal reservoir volume is used to simulate the simplified case study under other operating objectives than water supply, in order to assess whether and how the system performance changes. The more robust the infrastructural design, the smaller the difference between the performances of

  9. The MSFC Systems Engineering Guide: An Overview and Plan

    NASA Technical Reports Server (NTRS)

    Shelby, Jerry; Thomas, L. Dale

    2007-01-01

    This paper describes the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that describes the system engineering processes used by MSFC in the development of ongoing complex space systems such as the Ares launch vehicle and forthcoming ones as well. It is the intent of this website to be a "One Stop Shop' for MSFC systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and references, and provide an archive of relevant systems engineering artifacts produced by the many NASA projects developed and managed by MSFC over the years.

  10. Information Technology Management: Global Command and Control System Joint Operation Planning and Execution System

    DTIC Science & Technology

    2007-11-02

    Information Technology Management Department of Defense Office of the Inspector General April 15, 2003 AccountabilityIntegrityQuality Global Command...Dates Covered (from... to) - Title and Subtitle Information Technology Management : Global Command and Control System Joint Operation Planning and...September 7, 1999; “GCCS Strategic Plan 1999-2002,” December 27, 1999; “JOPES Strategic Plan,” April 2000; “ Information Technology Management Reform Act

  11. HEMP emergency planning and operating procedures for electric power systems

    SciTech Connect

    Reddoch, T.W.; Markel, L.C. )

    1991-01-01

    Investigations of the impact of high-altitude electromagnetic pulse (HEMP) on electric power systems and electrical equipment have revealed that HEMP creates both misoperation and failures. These events result from both the early time E[sub 1] (steep-front pulse) component and the late time E[sub 3] (geomagnetic perturbations) component of HEMP. In this report a HEMP event is viewed in terms of its marginal impact over classical power system disturbances by considering the unique properties and consequences of HEMP. This report focuses on system-wide electrical component failures and their potential consequences from HEMP. In particular, the effectiveness of planning and operating procedures for electric systems is evaluated while under the influence of HEMP. This assessment relies on published data and characterizes utilities using the North American Electric Reliability Council's regions and guidelines to model electric power system planning and operations. Key issues addressed by the report include how electric power systems are affected by HEMP and what actions electric utilities can initiate to reduce the consequences of HEMP. The report also reviews the salient features of earlier HEMP studies and projects, examines technology trends in the electric power industry which are affected by HEMP, characterizes the vulnerability of power systems to HEMP, and explores the capability of electric systems to recover from a HEMP event.

  12. Light duty arm system deployment plans and applications

    SciTech Connect

    Carteret, B.A.

    1996-12-31

    The Light Duty Utility Arm (LDUA) System is being developed to provide an integrated system of technologies to deploy tools and sensors, called end effectors, in underground storage tanks. The objective of this project is to develop and field new technologies to obtain information about the conditions and contents of the United States Department of Energy`s (DOE`s) underground waste storage tanks and to perform small scale retrieval operations. The project scope includes development and demonstration of advanced robotic technologies, sensory end effectors, waste retrieval tools, and support systems for field deployment in underground storage tanks. In-tank demonstrations of the LDUA System are planned at three DOE sites by the fall of 1997. The system will be deployed in tanks at Hanford, Oak Ridge National Laboratory (ORNL), and Idaho National Engineering Laboratory (INEL) to demonstrate system applications in the areas of surveillance and inspection, in-tank waste analysis, sampling, and waste heel retrieval. This paper will provide a general description of the system design and discuss planned applications of the system technologies to support DOE environmental restoration programs.

  13. A recipe-based, diet-planning modelling system.

    PubMed

    Leung, P; Wanitprapha, K; Quinn, L A

    1995-08-01

    In a recent article in the British Journal of Nutrition, Sklan & Dariel (1993) presented a method for diet planning employing a mixed-integer programming algorithm for meeting nutritional requirements at minimum costs for institutions or individuals. They recognized that most food items are generally consumed in whole units and as such they are represented as integer variables. However, as in most previous studies, they derived the minimum cost diets by optimizing over purchased food items. The present paper presents a computer-assisted, diet-planning modelling system for individuals by optimizing over recipes instead of food items. This is accomplished by restricting the integer programming solutions to those bundles of food that represent reasonably popular meal recipes. The modelling system is composed of three main components: recipe data entry, database management, and the model. The recipe data entry component creates and stores recipes. It also provides nutritional analysis of the recipes. The database management component creates and maintains several databases necessary to build the modelling data file. The modelling component solves the user-specified model. Currently, the model component can solve for the optimal diet by minimizing cost or minimizing cooking and preparation time. The optimal diet is prepared to satisfy the recommended nutritional guidelines for a predefined group of individuals for 1 week. The system currently has 895 popular recipes found in Hawaii. Diet plans generated using this modelling system with differing objectives are discussed and compared.

  14. OCRWM Systems Engineering Management Plan (SEMP). Revision 3

    SciTech Connect

    Not Available

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M&O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [``Program`` refers to the CRWMS-wide activity and ``project`` refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project.

  15. Architectural Room Planning Support System using Methods of Generating Spatial Layout Plans and Evolutionary Multi-objective Optimization

    NASA Astrophysics Data System (ADS)

    Inoue, Makoto; Takagi, Hideyuki

    Firstly, we propose a spatial planning algorithm inspired by cellar automaton and spatial growth rules for spatial planning support, i.e. generating multiple subspaces and making their layouts. Their features are that there is less restrictions in the shapes, sizes, and positions of the generated subspaces and gap sizes among the subspaces are controllable. We also show the framework of our final spatial planning support system that consists of (1) a spatial layout generator including the mentioned algorithm and rules as main parts and a visualization part generating layout diagrams and (2) an optimization part which main components, i.e. evolutionary multi-objective optimization (EMO) and interactive evolutionary computation, optimize the generated spatial plans. Secondly, we make a concrete architectural room planning support system based on some parts of the said framework and confirm that the EMO makes the generated architectural room plans converge, experimentally. We confirm the performance of the system using two EMO's with four and six objectives, respectively. We also evaluate the effect of introducing a niche technique into the EMO to obtain the variety of architectural room plans. The experiments showed that the convergence of each objective over generations and variety of architectural room plans among individuals of higher scores. This experimental evaluation implies that the combination of our proposed spatial planning algorithms and spatial growth rules is applicable to spatial planning support systems.

  16. Coal-fired high performance power generating system. Quarterly progress report, October 1--December 31, 1992

    SciTech Connect

    Not Available

    1992-12-31

    Our team has outlined a research plan based on an optimized analysis of a 250 MWe combined cycle system applicable to both frame type and aeroderivative gas turbines. Under the constraints of the cycle analysis we have designed a high temperature advanced furnace (FUTAF) which integrates several combustor and air heater designs with appropriate ash management procedures. The Cycle Optimization effort under Task 2 outlines the evolution of our designs. The basic combined cycle approach now includes exhaust gas recirculation to quench the flue gas before it enters the convective air heater. By selecting the quench gas from a downstream location it will be clean enough and cool enough (ca. 300F) to be driven by a commercially available fan and still minimize the volume of the convective air heater. Further modeling studies on the long axial flame, under Task 3, have demonstrated that this configuration is capable of providing the necessary energy flux to the radiant air panels. This flame with its controlled mixing constrains the combustion to take place in a fuel rich environment, thus minimizing the NO{sub x} production. Recent calculations indicate that the NO{sub x} produced is low enough that the SNCR section can further reduce it to within the DOE goal of 0. 15 lbs/MBTU of fuel input. Also under Task 3 the air heater design optimization continued.

  17. SU-E-T-630: Commissioning for SRS Planning Systems

    SciTech Connect

    Pella, S; Smith, C; Leventouri, T; Bacala, A

    2014-06-15

    Purpose: This study will try to find optimal procedures to collect small fields beam data for commissioning in treatment planning systems (TPS), and to provide a protocol to collect output factors for very small field sizes: 0.5 cm × 0.5 cm to 4.0 cm × 4.0 cm.This will help in determining the correct beam configuration methods in TPS planning intensity modulated radiation therapy (IMRT), and stereotactic radiosurgery SRS using mini multileaf collimation (mMLC). Methods: Data has been collected for a mMLC linear accelerator (linac) Novalis from 0.5 cm × 0.5 cm to 10 cm × 10 cm (its maximum field size). The TPS chosen is BrainLab, Eclipse and Cyberknife. The beam data collected was modeled and imported in the TPS. Verification plans were generated in solid water to confirm the goodness of the data. 3D and IMRT plans on regular CT scans were generated and verified using Mapcheck. All 3D plans with field sizes above 4 cm × 4 cm verified excellent using a distance to agreement of 2 mm and a 2% tolerance. IMRT plans gave an error of -8%. New scans with new detectors have been taken, new field sizes were introduced, and focus has been applied on determining the dosimetric leaf gap. Results: Although this is still a work in progress, this study brings several issues to light: the importance of the correct technique in beam data collection from the correct watertank to the correct detectors. Readings for rectangular fields have to be taken especially for fields which one side is under 4 cm. Conclusion: The use of equivalent square fields will not provide correct readings for the fields with large differences between the length and the width.

  18. The ICRH System Planned for Wendelstein 7-X

    NASA Astrophysics Data System (ADS)

    Hartmann, D. A.; Birus, D.; Wendorf, J.; Wesner, F.

    2005-09-01

    The Max-Planck Institute for Plasma Physics is presently building the stellarator experiment Wendelstein 7-X (W7-X) at Greifswald, Germany. First plasma operation in planned after 2010. The plasma will be heated primarily using electron cyclotron resonance heating (ECRH) at a magnetic field of B=2.5 T, but also using ion cyclotron resonance heating (ICRH) and neutral beam injection heating (NBI). The latter heating methods are necessary to study high beta discharges and fast ion confinement. The ICRF system is planned to consist of two radially movable antennas powered by two generators with an output power of 2 MW each. The antenna plasma load will be matched in real time to the generator impedance using ferrite loaded transmission line elements. In addition, 3dB couplers will passively protect the generators from RF power reflections during rapid changes of the antenna plasma load that are too fast for the ferrite matching system.

  19. Coal Power Systems strategic multi-year program plans

    SciTech Connect

    2001-02-01

    The Department of Energy's (DOE) Office of Fossil Energy (FE), through the Coal and Power Systems (C and PS) program, funds research to advance the scientific knowledge needed to provide new and improved energy technologies; to eliminate any detrimental environmental effects of energy production and use; and to maintain US leadership in promoting the effective use of US power technologies on an international scale. Further, the C and PS program facilitates the effective deployment of these technologies to maximize their benefits to the Nation. The following Strategic Plan describes how the C and PS program intends to meet the challenges of the National Energy Strategy to: (1) enhance American's energy security; (2) improve the environmental acceptability of energy production and use; (3) increase the competitiveness and reliability of US energy systems; and (4) ensure a robust US energy future. It is a plan based on the consensus of experts and managers from FE's program offices and the National Energy Technology Laboratory (NETL).

  20. Iterative Repair Planning for Spacecraft Operations Using the Aspen System

    NASA Technical Reports Server (NTRS)

    Rabideau, G.; Knight, R.; Chien, S.; Fukunaga, A.; Govindjee, A.

    2000-01-01

    This paper describes the Automated Scheduling and Planning Environment (ASPEN). ASPEN encodes complex spacecraft knowledge of operability constraints, flight rules, spacecraft hardware, science experiments and operations procedures to allow for automated generation of low level spacecraft sequences. Using a technique called iterative repair, ASPEN classifies constraint violations (i.e., conflicts) and attempts to repair each by performing a planning or scheduling operation. It must reason about which conflict to resolve first and what repair method to try for the given conflict. ASPEN is currently being utilized in the development of automated planner/scheduler systems for several spacecraft, including the UFO-1 naval communications satellite and the Citizen Explorer (CX1) satellite, as well as for planetary rover operations and antenna ground systems automation. This paper focuses on the algorithm and search strategies employed by ASPEN to resolve spacecraft operations constraints, as well as the data structures for representing these constraints.

  1. Urban Climate Map System for Dutch spatial planning

    NASA Astrophysics Data System (ADS)

    Ren, Chao; Spit, Tejo; Lenzholzer, Sanda; Yim, Hung Lam Steve; Heusinkveld, Bert; van Hove, Bert; Chen, Liang; Kupski, Sebastian; Burghardt, René; Katzschner, Lutz

    2012-08-01

    Facing climate change and global warming, outdoor climatic environment is an important consideration factor for planners and policy makers because improving it can greatly contribute to achieve citizen's thermal comfort and create a better urban living quality for adaptation. Thus, the climatic information must be assessed systematically and applied strategically into the planning process. This paper presents a tool named Urban Climate Map System (UCMS) that has proven capable of helping compact cities to incorporate climate effects in planning processes in a systematic way. UCMS is developed and presented in a Geographic Information System (GIS) platform in which the lessons learned and experience gained from interdisciplinary studies can be included. The methodology of UCMS of compact cities, the construction procedure, and the basic input factors - including the natural climate resources and planning data - are described. Some literatures that shed light on the applicability of UMCS are reported. The Municipality of Arnhem is one of Dutch compact urban areas and still under fast urban development and urban renewal. There is an urgent need for local planners and policy makers to protect local climate and open landscape resources and make climate change adaptation in urban construction. Thus, Arnhem is chosen to carry out a case study of UCMS. Although it is the first work of Urban Climatic Mapping in The Netherlands, it serves as a useful climatic information platform to local planners and policy makers for their daily on-going works. We attempt to use a quick method to collect available climatic and planning data and create an information platform for planning use. It relies mostly on literature and theoretical understanding that has been well practiced elsewhere. The effort here is to synergize the established understanding for a case at hand and demonstrate how useful guidance can still be made for planners and policy makers.

  2. Planning considerations for the intermountain HVDC transmission system

    SciTech Connect

    Lee, R.L.; Beshir, M.J.; Gee, J.H.

    1986-01-01

    Planning of an HVDC transmission system embedded into an existing ac network may require unique control and converter equipment capability in order to satisfy stability requirements of the network. The planning and design of the Intermountain Power Project HVDC transmission system are based on unique control performance features for power transfers during terminal ac faults, rapid power recovery following fault clearing and utilization of exceptionally high transient overload capability of 2 per unit during the post-fault period to maintain system stability. The Department, in its efforts to meet the Western Systems Coordinating Council's (WSCC) reliability criteria, developed and incorporated into its HVDC specifications very rigorous reliability and availability requirements. One objective of this project was to attain the unusually low bipolar converter system outage frequency goal of one outage in five years to achieve a bipole performance rating equivalent to two ac circuits of similar capability. The reliability goals of this project have provided one of the impetus for revisions to the WSCC Reliability Criteria for System Design. The reliability goals and other features adopted for the Intermountain HVDC transmission system are discussed in this paper and study results are included to demonstrate the effectiveness of various controls implemented as stability enhancement techniques.

  3. Utility Battery Storage Systems Program plan: FY 1994--FY 1998

    SciTech Connect

    Not Available

    1994-02-01

    The Utility Battery Storage Systems Program, sponsored by the US Department of Energy (DOE), is addressing needed improvements so that the full benefits of these systems can be realized. A key element of the Program is the quantification of the benefits of batteries used in utility applications. The analyses of the applications and benefits are ongoing, but preliminary results indicate that the widespread introduction of battery storage by utilities could benefit the US economy by more than $26 billion by 2010 and create thousands of new jobs. Other critical elements of the DOE Program focus on improving the batteries, power electronics, and control subsystems and reducing their costs. These subsystems are then integrated and the systems undergo field evaluation. Finally, the most important element of the Program is the communication of the capabilities and benefits of battery systems to utility companies. Justifiably conservative, utilities must have proven, reliable equipment that is economical before they can adopt new technologies. While several utilities are leading the industry by demonstrating battery systems, a key task of the DOE program is to inform the entire industry of the value, characteristics, and availability of utility battery systems so that knowledgeable decisions can be made regarding future investments. This program plan for the DOE Utility Battery Storage Systems Program describes the technical and programmatic activities needed to bring about the widespread use of batteries by utilities. By following this plan, the DOE anticipates that many of the significant national benefits from battery storage will be achieved in the near future.

  4. Assessing the Performance of Human-Automation Collaborative Planning Systems

    DTIC Science & Technology

    2011-06-01

    Lamont, G.B., On Measuring Multiobjective Evolutionary Algorithm Performance, in Congress on Evolutionary Computation (CEC 2000), A. Zalzala and R...A.C. and Graves, R.J., "Multiobjective Evolutionary Decision Support for Design-Supplier-Manufacturing Planning." IEEE Transactions on Systems, Man...Biocognitive Epistemology ." The Journal of Mind and Behavior, 2001. 22(4): p. 407-426. 127. Bondi, A.B., Characteristics of Scalability and Their Impact

  5. Planning for an Individual Water System. Fourth Edition Revised.

    ERIC Educational Resources Information Center

    Turner, J. Howard, Ed.

    Few investments have as little thought given to planning as the installation of a water-supply system for the home or farm. There are many considerations to be made if an adequate supply of water is to be available for the living and recreational needs of a family or the needs of livestock. This book is designed to instruct the reader on how to…

  6. Planning for an Individual Water System. Fourth Edition Revised.

    ERIC Educational Resources Information Center

    Turner, J. Howard, Ed.

    Few investments have as little thought given to planning as the installation of a water-supply system for the home or farm. There are many considerations to be made if an adequate supply of water is to be available for the living and recreational needs of a family or the needs of livestock. This book is designed to instruct the reader on how to…

  7. A Strategic Plan for Support of Expert Systems in Organizations.

    DTIC Science & Technology

    1987-09-01

    hEfhh"E ~~m2MIP I I"- 1.2 L qq1. MIrPC) COPV RISIMUT’ N TEST CH1ART 96 1 3A %9 %Y ’ V II A STRATEGIC PLAN FOR SUPPORT OF EXPERT SYSTEMS IN...1 Problem Statement ................ 3 Research Questions. ............ Scope of the Study. . .............. L Definitions...68 iii Page U. Summary, Conclusions, and Recommendations 69 Chapter Overview .... ........... .. 69 Significance of the Research ....... .. 69

  8. SU-E-T-502: Initial Results of a Comparison of Treatment Plans Produced From Automated Prioritized Planning Method and a Commercial Treatment Planning System

    SciTech Connect

    Tiwari, P; Chen, Y; Hong, L; Apte, A; Yang, J; Mechalakos, J; Mageras, G; Hunt, M; Deasy, J

    2015-06-15

    Purpose We developed an automated treatment planning system based on a hierarchical goal programming approach. To demonstrate the feasibility of our method, we report the comparison of prostate treatment plans produced from the automated treatment planning system with those produced by a commercial treatment planning system. Methods In our approach, we prioritized the goals of the optimization, and solved one goal at a time. The purpose of prioritization is to ensure that higher priority dose-volume planning goals are not sacrificed to improve lower priority goals. The algorithm has four steps. The first step optimizes dose to the target structures, while sparing key sensitive organs from radiation. In the second step, the algorithm finds the best beamlet weight to reduce toxicity risks to normal tissue while holding the objective function achieved in the first step as a constraint, with a small amount of allowed slip. Likewise, the third and fourth steps introduce lower priority normal tissue goals and beam smoothing. We compared with prostate treatment plans from Memorial Sloan Kettering Cancer Center developed using Eclipse, with a prescription dose of 72 Gy. A combination of liear, quadratic, and gEUD objective functions were used with a modified open source solver code (IPOPT). Results Initial plan results on 3 different cases show that the automated planning system is capable of competing or improving on expert-driven eclipse plans. Compared to the Eclipse planning system, the automated system produced up to 26% less mean dose to rectum and 24% less mean dose to bladder while having the same D95 (after matching) to the target. Conclusion We have demonstrated that Pareto optimal treatment plans can be generated automatically without a trial-and-error process. The solver finds an optimal plan for the given patient, as opposed to database-driven approaches that set parameters based on geometry and population modeling.

  9. Practical Problems in Connection with the Planning and Introduction of Information Systems. Technical Report.

    ERIC Educational Resources Information Center

    Klose, Traugott

    Major reforms brought about in July 1969 at the Free University of Berlin in its organization, planning, and decision making are reviewed. Specific problems are addressed, such as plans for introducing an information system on technical data and space use, plans for an information system on personnel employed by the university, and plans for an…

  10. Manned space flight nuclear system safety. Volume 6: Space base nuclear system safety plan

    NASA Technical Reports Server (NTRS)

    1972-01-01

    A qualitative identification of the steps required to assure the incorporation of radiological system safety principles and objectives into all phases of a manned space base program are presented. Specific areas of emphasis include: (1) radiological program management, (2) nuclear system safety plan implementation, (3) impact on program, and (4) summary of the key operation and design guidelines and requirements. The plan clearly indicates the necessity of considering and implementing radiological system safety recommendations as early as possible in the development cycle to assure maximum safety and minimize the impact on design and mission plans.

  11. Variation in external beam treatment plan quality: An inter-institutional study of planners and planning systems.

    PubMed

    Nelms, Benjamin E; Robinson, Greg; Markham, Jay; Velasco, Kyle; Boyd, Steve; Narayan, Sharath; Wheeler, James; Sobczak, Mark L

    2012-01-01

    This study quantifies variation in radiation treatment plan quality for plans generated by a population of treatment planners given very specific plan objectives. A "Plan Quality Metric" (PQM) with 14 submetrics, each with a unique value function, was defined for a prostate treatment plan, serving as specific goals of a hypothetical "virtual physician." The exact PQM logic was distributed to a population of treatment planners (to remove ambiguity of plan goals or plan assessment methodology) as was a predefined computed tomographic image set and anatomic structure set (to remove anatomy delineation as a variable). Treatment planners used their clinical treatment planning system (TPS) to generate their best plan based on the specified goals and submitted their results for analysis. One hundred forty datasets were received and 125 plans accepted and analyzed. There was wide variability in treatment plan quality (defined as the ability of the planners and plans to meet the specified goals) quantified by the PQM. Despite the variability, the resulting PQM distributions showed no statistically significant difference between TPS employed, modality (intensity modulated radiation therapy versus arc), or education and certification status of the planner. The PQM results showed negligible correlation to number of beam angles, total monitor units, years of experience of the planner, or planner confidence. The ability of the treatment planners to meet the specified plan objectives (as quantified by the PQM) exhibited no statistical dependence on technologic parameters (TPS, modality, plan complexity), nor was the plan quality statistically different based on planner demographics (years of experience, confidence, certification, and education). Therefore, the wide variation in plan quality could be attributed to a general "planner skill" category that would lend itself to processes of continual improvement where best practices could be derived and disseminated to improve the

  12. Disaster recovery plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The BMS production implementation will be complete by October 1, 1998 and the server environment will be comprised of two types of platforms. The PassPort Supply and the PeopleSoft Financials will reside on LNIX servers and the PeopleSoft Human Resources and Payroll will reside on Microsoft NT servers. Because of the wide scope and the requirements of the COTS products to run in various environments backup and recovery responsibilities are divided between two groups in Technical Operations. The Central Computer Systems Management group provides support for the LTNIX/NT Backup Data Center, and the Network Infrastructure Systems group provides support for the NT Application Server Backup outside the Data Center. The disaster recovery process is dependent on a good backup and recovery process. Information and integrated system data for determining the disaster recovery process is identified from the Fluor Daniel Hanford (FDH) Risk Assessment Plan, Contingency Plan, and Backup and Recovery Plan, and Backup Form for HANDI 2000 BMS.

  13. Interactive orbital proximity operations planning system instruction and training guide

    NASA Technical Reports Server (NTRS)

    Grunwald, Arthur J.; Ellis, Stephen R.

    1994-01-01

    This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

  14. Progress and plan of KSTAR plasma control system upgrade

    DOE PAGES

    Hahn, Sang-hee; Kim, Y. J.; Penaflor, B. G.; ...

    2016-06-01

    The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable duringmore » the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.« less

  15. Progress and plan of KSTAR plasma control system upgrade

    SciTech Connect

    Hahn, Sang-hee; Kim, Y. J.; Penaflor, B. G.; Bak, J. G.; Han, H.; Hong, J. S.; Jeon, Y. M.; Jeong, J. H.; Joung, M.; Juhn, J. W.; Kim, J. S.; Kim, H. S.; Lee, W. R.; Woo, M. H.; Eidietis, N. W.; Ferron, J. R.; Humphreys, D. A.; Hyatt, A.; Johnson, R. D.; Piglowski, D. A.; Walker, M. L.; Welander, A. S.; Mueller, D.; Milne, P. G.

    2016-06-01

    The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Here, major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ~48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  16. Soil consumption: An innovative system for better planning and managing soil in urban planning context

    NASA Astrophysics Data System (ADS)

    Basile, Angelo; Bonfante, Antonello; Langella, Giuliano; Minieri, Luciana; De Michele, Carlo; D'Antonio, Amedeo; Manna, Piero; Terribile, Fabio

    2015-04-01

    Soil is a key natural resource and most crucial ecosystem services and the most important environmental benefits to humankind and the environment depend by its properties. However, soil is a delicate resource. Urbanization is the most impactful use of soils because it can cancel all its ecosystem functions and ends forever its life cycle since soil is removed completely and/or sealed with a cement/bitumen layer. The absence of an adequate soil culture led common urban planning to do not consider the reality of soil as living multifunctional system. In such framework, this work - performed under the project LIFE + SOILCONSWEB - aims to illustrate a different approach for soil management in spatial planning using a Spatial Decision Support System operating through the web (w-SDSS) to evaluate soil consumption. The system - already operating in an area of Southern Italy (Telese valley, 20,000 ha) - allows - in real time - to provide answers such as (i) the use of land (type and size) on different dates, (ii) mapping and statistics on the sprawl at the municipality scale, (iii) detailed mapping of land fragmentation (and statistical fragmentation) on different dates, (iv) quantification of loss of ecosystem services after potential new urbanization.

  17. Vulnerability Management for an Enterprise Resource Planning System

    NASA Astrophysics Data System (ADS)

    Goel, Shivani; Kiran, Ravi; Garg, Deepak

    2012-09-01

    Enterprise resource planning (ERP) systems are commonly used in technical educational institutions(TEIs). ERP systems should continue providing services to its users irrespective of the level of failure. There could be many types of failures in the ERP systems. There are different types of measures or characteristics that can be defined for ERP systems to handle the levels of failure. Here in this paper, various types of failure levels are identified along with various characteristics which are concerned with those failures. The relation between all these is summarized. The disruptions causing vulnerabilities in TEIs are identified .A vulnerability management cycle has been suggested along with many commercial and open source vulnerability management tools. The paper also highlights the importance of resiliency in ERP systems in TEIs.

  18. GIS leads to more efficient route planning. [Geographic Information System

    SciTech Connect

    Not Available

    1993-04-26

    New computer approaches currently being developed by Argonne National Laboratory, Argonne, Ill., for the Gas Research Institute, Chicago, will make planning a pipeline route easier and more cost effective by combining a wide variety of geographical data for a specific area, according to GRI. The new approaches use currently available geographic information system (GIS) to store those data in digital form and present them in combinations of overlying layers. The paper describes some of the obstacles normally found along a proposed route; the options available within the GIS software; and the time and money saving advantages of the system.

  19. Access 5 - Step 1: Human Systems Integration Program Plan (HSIPP)

    NASA Technical Reports Server (NTRS)

    2005-01-01

    This report describes the Human System Interface (HSI) analysis, design and test activities that will be performed to support the development of requirements and design guidelines to facilitate the incorporation of High Altitude Long Endurance (HALE) Remotely Operated Aircraft (ROA) at or above FL400 in the National Airspace System (NAS). These activities are required to support the design and development of safe, effective and reliable ROA operator and ATC interfaces. This plan focuses on the activities to be completed for Step 1 of the ACCESS 5 program. Updates to this document will be made for each of the four ACCESS 5 program steps.

  20. Test and evaluation plan for the Centralized Storm Information System

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation of the Centralized Storm Information System (CSIS) at the NOAA operational complex in Kansas City, Missouri is described. This complex includes the National Severe Storms Forecast center and a Satellite Field Service Station which is denoted in this research plan as NSSFC. CSIS computers will act in concert to merge analyze the many data sets needed to forecast severe convective storms. Specific aspects of CSIS are evaluated against the CSIS objectives. The functions to be evaluated characterize the attributes of a generalized interactive computer system. A major development in the CSIS program will allow communication between CSIS and the NSSFC Eclipse computer.

  1. SU-E-T-580: Comparison of Cervical Carcinoma IMRT Plans From Four Commercial Treatment Planning Systems (TPS)

    SciTech Connect

    Cao, Y; Li, R; Chi, Z; Zhu, S

    2014-06-01

    Purpose: Different treatment planning systems (TPS) use different treatment optimization and leaf sequencing algorithms. This work compares cervical carcinoma IMRT plans optimized with four commercial TPSs to investigate the plan quality in terms of target conformity and delivery efficiency. Methods: Five cervical carcinoma cases were planned with the Corvus, Monaco, Pinnacle and Xio TPSs by experienced planners using appropriate optimization parameters and dose constraints to meet the clinical acceptance criteria. Plans were normalized for at least 95% of PTV to receive the prescription dose (Dp). Dose-volume histograms and isodose distributions were compared. Other quantities such as Dmin(the minimum dose received by 99% of GTV/PTV), Dmax(the maximum dose received by 1% of GTV/PTV), D100, D95, D90, V110%, V105%, V100% (the volume of GTV/PTV receiving 110%, 105%, 100% of Dp), conformity index(CI), homogeneity index (HI), the volume of receiving 40Gy and 50 Gy to rectum (V40,V50) ; the volume of receiving 30Gy and 50 Gy to bladder (V30,V50) were evaluated. Total segments and MUs were also compared. Results: While all plans meet target dose specifications and normal tissue constraints, the maximum GTVCI of Pinnacle plans was up to 0.74 and the minimum of Corvus plans was only 0.21, these four TPSs PTVCI had significant difference. The GTVHI and PTVHI of Pinnacle plans are all very low and show a very good dose distribution. Corvus plans received the higer dose of normal tissue. The Monaco plans require significantly less segments and MUs to deliver than the other plans. Conclusion: To deliver on a Varian linear-accelerator, the Pinnacle plans show a very good dose distribution. Corvus plans received the higer dose of normal tissue. The Monaco plans have faster beam delivery.

  2. Multimodal system for the planning and guidance of bronchoscopy

    NASA Astrophysics Data System (ADS)

    Higgins, William E.; Cheirsilp, Ronnarit; Zang, Xiaonan; Byrnes, Patrick

    2015-03-01

    Many technical innovations in multimodal radiologic imaging and bronchoscopy have emerged recently in the effort against lung cancer. Modern X-ray computed-tomography (CT) scanners provide three-dimensional (3D) high-resolution chest images, positron emission tomography (PET) scanners give complementary molecular imaging data, and new integrated PET/CT scanners combine the strengths of both modalities. State-of-the-art bronchoscopes permit minimally invasive tissue sampling, with vivid endobronchial video enabling navigation deep into the airway-tree periphery, while complementary endobronchial ultrasound (EBUS) reveals local views of anatomical structures outside the airways. In addition, image-guided intervention (IGI) systems have proven their utility for CT-based planning and guidance of bronchoscopy. Unfortunately, no IGI system exists that integrates all sources effectively through the complete lung-cancer staging work flow. This paper presents a prototype of a computer-based multimodal IGI system that strives to fill this need. The system combines a wide range of automatic and semi-automatic image-processing tools for multimodal data fusion and procedure planning. It also provides a flexible graphical user interface for follow-on guidance of bronchoscopy/EBUS. Human-study results demonstrate the system's potential.

  3. Improving the Army Planning, Programming, Budgeting, and Execution System (PPBES) The Planning Phase

    DTIC Science & Technology

    2000-01-01

    In 1997 the Army asked that RAND Arroyo Center assist in the reengineering of The Army Plan (TAP). The Army also reinstituted strategic planning and...the product was the Army Strategic Planning Guidance (ASPG), which provides strategic guidance to TAP. Planning and programming in the Army are

  4. Control method for turbocharged diesel engines having exhaust gas recirculation

    DOEpatents

    Kolmanovsky, Ilya V.; Jankovic, Mrdjan J; Jankovic, Miroslava

    2000-03-14

    A method of controlling the airflow into a compression ignition engine having an EGR and a VGT. The control strategy includes the steps of generating desired EGR and VGT turbine mass flow rates as a function of the desired and measured compressor mass airflow values and exhaust manifold pressure values. The desired compressor mass airflow and exhaust manifold pressure values are generated as a function of the operator-requested fueling rate and engine speed. The EGR and VGT turbine mass flow rates are then inverted to corresponding EGR and VGT actuator positions to achieve the desired compressor mass airflow rate and exhaust manifold pressure. The control strategy also includes a method of estimating the intake manifold pressure used in generating the EGR valve and VGT turbine positions.

  5. Diesel emission reduction using internal exhaust gas recirculation

    DOEpatents

    He, Xin [Denver, CO; Durrett, Russell P [Bloomfield Hills, MI

    2012-01-24

    A method for controlling combustion in a direct-injection diesel engine includes monitoring a crankshaft rotational position of a cylinder of the engine, monitoring an engine load, determining an intake stroke within the cylinder based upon the crankshaft rotational position, and when the engine load is less than a threshold engine load, opening an exhaust valve for the cylinder during a portion of the intake stroke.

  6. Integrated system dynamics toolbox for water resources planning.

    SciTech Connect

    Reno, Marissa Devan; Passell, Howard David; Malczynski, Leonard A.; Peplinski, William J.; Tidwell, Vincent Carroll; Coursey, Don (University of Chicago, Chicago, IL); Hanson, Jason (University of New Mexico, Albuquerque, NM); Grimsrud, Kristine (University of New Mexico, Albuquerque, NM); Thacher, Jennifer (University of New Mexico, Albuquerque, NM); Broadbent, Craig (University of New Mexico, Albuquerque, NM); Brookshire, David; Chemak, Janie; Cockerill, Kristan; Aragon, Carlos , Socorro, NM); Hallett, Heather (New Mexico Univeristy of Technology and Mining , Socorro, NM); Vivoni, Enrique (New Mexico Univeristy of Technology and Mining , Socorro, NM); Roach, Jesse

    2006-12-01

    Public mediated resource planning is quickly becoming the norm rather than the exception. Unfortunately, supporting tools are lacking that interactively engage the public in the decision-making process and integrate over the myriad values that influence water policy. In the pages of this report we document the first steps toward developing a specialized decision framework to meet this need; specifically, a modular and generic resource-planning ''toolbox''. The technical challenge lies in the integration of the disparate systems of hydrology, ecology, climate, demographics, economics, policy and law, each of which influence the supply and demand for water. Specifically, these systems, their associated processes, and most importantly the constitutive relations that link them must be identified, abstracted, and quantified. For this reason, the toolbox forms a collection of process modules and constitutive relations that the analyst can ''swap'' in and out to model the physical and social systems unique to their problem. This toolbox with all of its modules is developed within the common computational platform of system dynamics linked to a Geographical Information System (GIS). Development of this resource-planning toolbox represents an important foundational element of the proposed interagency center for Computer Aided Dispute Resolution (CADRe). The Center's mission is to manage water conflict through the application of computer-aided collaborative decision-making methods. The Center will promote the use of decision-support technologies within collaborative stakeholder processes to help stakeholders find common ground and create mutually beneficial water management solutions. The Center will also serve to develop new methods and technologies to help federal, state and local water managers find innovative and balanced solutions to the nation's most vexing water problems. The toolbox is an important step toward achieving the technology development goals of this center.

  7. Risk management: application of early warning systems to emergency plans

    NASA Astrophysics Data System (ADS)

    Garcia, C.; Sterlacchini, S.; Pasuto, A.; de Amicis, M.

    2009-04-01

    Warning System and emergency plans are two fundamental elements of risk management and governance, but unfortunately, most of the times, they are developed independently one from the other, as sequential steps not necessary linked. The main goal of this research is to develop a methodology for applying Early Warning Systems - Community Based to the emergency plan using the results of social surveys and quantitative risk assessment, taking into account the administrative structure and the planning system of the study area, as well as the legislative obligations of each entity involved in the risk governance and emergency management. Using a integrative scientific and social approach to natural hazards the research aim to contribute to fill the gap between scientists, policy makers, stakeholders and community. Initially applied in Comunità Montana Valtellina di Tirano, Italy, the methodology involves the application of two comprehensive surveys. The first is addressed to stakeholders (including policy makers, emergency managers, emergency volunteers, consultants and scientists) in order to determine their needs, points of view, concerns and constraints. The second survey is addressed specifically to local community to assess risk perception, awareness, needs, capacity and level of trust towards stakeholders, besides asking for their willingness to participate in future risk communication activities. The Early Warning System developed includes all the stages of the early warning process (hazard evaluation and forecasting; warning and dissemination and public response) and would be based on a multidisciplinary partnership that takes into account the different actors involved in the risk management in order to accomplish a more reliable and credible result, including an emergency plan specifically designed for each study area. After evaluating the results of the surveys, information and education campaigns will be developed with the objective of reducing vulnerability

  8. Software reuse in spacecraft planning and scheduling systems

    NASA Technical Reports Server (NTRS)

    Mclean, David; Tuchman, Alan; Broseghini, Todd; Yen, Wen; Page, Brenda; Johnson, Jay; Bogovich, Lynn; Burkhardt, Chris; Mcintyre, James; Klein, Scott

    1993-01-01

    The use of a software toolkit and development methodology that supports software reuse is described. The toolkit includes source-code-level library modules and stand-alone tools which support such tasks as data reformatting and report generation, simple relational database applications, user interfaces, tactical planning, strategic planning and documentation. The current toolkit is written in C and supports applications that run on IBM-PC's under DOS and UNlX-based workstations under OpenLook and Motif. The toolkit is fully integrated for building scheduling systems that reuse AI knowledge base technology. A typical scheduling scenario and three examples of applications that utilize the reuse toolkit will be briefly described. In addition to the tools themselves, a description of the software evolution and reuse methodology that was used is presented.

  9. A Planning System for Continuing Education Divisions: A Model.

    ERIC Educational Resources Information Center

    Bazik, Martha S.

    1985-01-01

    Details steps in a continuing education division planning model; i.e., define the planning group, develop a planning attitude, analyze internal and external environments, develop a mechanism for forecasting trends, hold planning sessions for determining strategic focus and operational plans, establish a timetable, hold follow-up/evaluation…

  10. An alternative approach to solar system exploration planning

    NASA Astrophysics Data System (ADS)

    Herman, Daniel H.; Niehoff, John C.; Spadoni, Daniel J.

    Planning for the future exploration of the solar system has involved the structuring of a series of missions that address major scientific objectives at a minimum runout cost for the entire endeavor. In many cases, however, the optimal structuring of a program that would minimize the runout cost would entail an unacceptable high annual funding. Our actual planning must consider the planning wedge imposed on the National Aeronautics and Space Administration. It is vital that a plan be structured that copes with the annual restraint. If we do not recognize this, our plan will not be realized and a queing problem will result, thus negating all of our planning efforts. This paper presents ideas as to how planetary initiatives can be structured, wherein the peak annual funding is minimized. One vital aspect in the plan is to have a transportation capability that can launch a mission in any planetary opportunity. Solar electric propulsion can provide this capability. Another cost reduction approach would be to structure a mission set in a time sequenced fashion that could utilize essentially the same spacecraft for the implementation of several missions. This opportunity does exist. A third technique would be to fulfill a scientific objective in several sequential missions rather than attempt to accomplish all of the objectives with one mission. This approach might be applied to a mission currently in the planning stage designated the Saturn Orbiter Dual Probe mission. The current concept involves the delivery of a Saturn probe, a Titan probe, and a Saturn Orbiter by a one Shuttle launch. In this case, the orbiter must serve as a relay station for both probes; map the magnetosphere of Saturn; conduct a survey of Saturn's major satellites; and perform the planetological observation of Saturn itself. This mission entails the development of a complex spacecraft that would be required to have a fairly long life due to the extended mission operations at the benefit of

  11. ERP (enterprise resource planning) systems can streamline healthcare business functions.

    PubMed

    Jenkins, E K; Christenson, E

    2001-05-01

    Enterprise resource planning (ERP) software applications are designed to facilitate the systemwide integration of complex processes and functions across a large enterprise consisting of many internal and external constituents. Although most currently available ERP applications generally are tailored to the needs of the manufacturing industry, many large healthcare systems are investigating these applications. Due to the significant differences between manufacturing and patient care, ERP-based systems do not easily translate to the healthcare setting. In particular, the lack of clinical standardization impedes the use of ERP systems for clinical integration. Nonetheless, an ERP-based system can help a healthcare organization integrate many functions, including patient scheduling, human resources management, workload forecasting, and management of workflow, that are not directly dependent on clinical decision making.

  12. Work management plan for data systems and analysis directorate

    NASA Technical Reports Server (NTRS)

    Nichols, L. R.

    1979-01-01

    A contract with the Data Systems and Analysis Directorate contains a specified level of resources related to a specific set of work in support of three divisions within the Data Systems and Analysis Directorate. The divisions are Institutional Data Systems Division, Ground Data Systems Division, and Mission Planning and Analysis Division. The Statement of work defines at a functional requirements level the type of support to be provided to the three divisions. The contract provides for further technical direction to the contractor through issuance of Job Orders. The Job order is the prime method of further defining the work to be done, allocating a portion of the total resources in the contract to the defined tasks, and further delegating technical responsibility.

  13. Operations system administration plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. This includes systems that support finance, supply, chemical management, human resources and payroll activities on the Hanford Site. The Passport (PP) software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing, and Material Safety Data Sheets (MSDS). The PeopleSoft (PS) software is an integrated application for General Ledger, Project Costing, Human Resources, Payroll, Benefits, and Training. The implementation of this set of products, as the first deliverable of the HANDI 2000 Project, is referred to as Business Management System (BMS) and MSDS.

  14. INEL test plan for evaluating waste assay systems

    SciTech Connect

    Mandler, J.W.; Becker, G.K.; Harker, Y.D.; Menkhaus, D.E.; Clements, T.L. Jr.

    1996-09-01

    A test bed is being established at the Idaho National Engineering Laboratory (INEL) Radioactive Waste Management Complex (RWMC). These tests are currently focused on mobile or portable radioassay systems. Prior to disposal of TRU waste at the Waste Isolation Pilot Plant (WIPP), radioassay measurements must meet the quality assurance objectives of the TRU Waste Characterization Quality Assurance Program Plan. This test plan provides technology holders with the opportunity to assess radioassay system performance through a three-tiered test program that consists of: (a) evaluations using non-interfering matrices, (b) surrogate drums with contents that resemble the attributes of INEL-specific waste forms, and (c) real waste tests. Qualified sources containing a known mixture and range of radionuclides will be used for the non-interfering and surrogate waste tests. The results of these tests will provide technology holders with information concerning radioassay system performance and provide the INEL with data useful for making decisions concerning alternative or improved radioassay systems that could support disposal of waste at WIPP.

  15. Web-based system for surgical planning and simulation

    NASA Astrophysics Data System (ADS)

    Eldeib, Ayman M.; Ahmed, Mohamed N.; Farag, Aly A.; Sites, C. B.

    1998-10-01

    The growing scientific knowledge and rapid progress in medical imaging techniques has led to an increasing demand for better and more efficient methods of remote access to high-performance computer facilities. This paper introduces a web-based telemedicine project that provides interactive tools for surgical simulation and planning. The presented approach makes use of client-server architecture based on new internet technology where clients use an ordinary web browser to view, send, receive and manipulate patients' medical records while the server uses the supercomputer facility to generate online semi-automatic segmentation, 3D visualization, surgical simulation/planning and neuroendoscopic procedures navigation. The supercomputer (SGI ONYX 1000) is located at the Computer Vision and Image Processing Lab, University of Louisville, Kentucky. This system is under development in cooperation with the Department of Neurological Surgery, Alliant Health Systems, Louisville, Kentucky. The server is connected via a network to the Picture Archiving and Communication System at Alliant Health Systems through a DICOM standard interface that enables authorized clients to access patients' images from different medical modalities.

  16. 76 FR 31647 - Joint Industry Plan; Notice of Filing of a National Market System Plan to Address Extraordinary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-01

    ... From the Federal Register Online via the Government Publishing Office ] SECURITIES AND EXCHANGE COMMISSION Joint Industry Plan; Notice of Filing of a National Market System Plan to Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y-Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago Stock Exchange, Inc., EDG...

  17. 77 FR 33498 - Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... From the Federal Register Online via the Government Publishing Office SECURITIES AND EXCHANGE COMMISSION Joint Industry Plans; Order Approving, on a Pilot Basis, the National Market System Plan To Address Extraordinary Market Volatility by BATS Exchange, Inc., BATS Y-Exchange, Inc., Chicago Board Options Exchange, Incorporated, Chicago Stock...

  18. 78 FR 54305 - Joint Industry Plan; Notice of Filing of the Fifth Amendment to the National Market System Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... COMMISSION Joint Industry Plan; Notice of Filing of the Fifth Amendment to the National Market System Plan To...., Financial Industry Regulatory Authority, Inc., NASDAQ OMX BX, Inc., NASDAQ OMX PHLX LLC, The Nasdaq Stock..., Inc., Financial Industry Regulatory Authority, Inc., NASDAQ OMX BX, Inc., NASDAQ OMX PHLX LLC,...

  19. 78 FR 15757 - Joint Industry Plan; Notice of Filing of the Third Amendment to the National Market System Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... COMMISSION Joint Industry Plan; Notice of Filing of the Third Amendment to the National Market System Plan to...., Financial Industry Regulatory Authority, Inc., NASDAQ OMX BX, Inc., NASDAQ OMX PHLX LLC, The Nasdaq Stock..., Inc., Financial Industry Regulatory Authority, Inc., NASDAQ OMX BX, Inc., NASDAQ OMX PHLX LLC,...

  20. Specification for installation of the crew activity planning system coaxial cable communication system

    NASA Technical Reports Server (NTRS)

    Allen, M. A.; Roman, G. S.

    1979-01-01

    The specification used to install a broadband coaxial cable communication system to support remote terminal operations on the Crew Activity Planning system at the Lyndon B. Johnson Space Center are reported. The system supports high speed communications between a Harris Slash 8 computer and one or more Sanders Graphic 7 displays.

  1. The MSFC Systems Engineering Guide: An Overview and Plan

    NASA Technical Reports Server (NTRS)

    Shelby, Jerry A.; Thomas, L. Dale

    2007-01-01

    As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and

  2. The MSFC Systems Engineering Guide: An Overview and Plan

    NASA Technical Reports Server (NTRS)

    Shelby, Jerry A.; Thomas, L. Dale

    2007-01-01

    As systems and subsystems requirements become more complex in the pursuit of the exploration of space, advanced technology will demand and require an integrated approach to the design and development of safe and successful space vehicles and there products. System engineers play a vital and key role in transforming mission needs into vehicle requirements that can be verified and validated. This will result in a safe and cost effective design that will satisfy the mission schedule. A key to successful vehicle design within systems engineering is communication. Communication, through a systems engineering infrastructure, will not only ensure that customers and stakeholders are satisfied but will also assist in identifying vehicle requirements; i.e. identification, integration and management. This vehicle design will produce a system that is verifiable, traceable, and effectively satisfies cost, schedule, performance, and risk throughout the life-cycle of the product. A communication infrastructure will bring about the integration of different engineering disciplines within vehicle design. A system utilizing these aspects will enhance system engineering performance and improve upon required activities such as Development of Requirements, Requirements Management, Functional Analysis, Test, Synthesis, Trade Studies, Documentation, and Lessons Learned to produce a successful final product. This paper will describe the guiding vision, progress to date and the plan forward for development of the Marshall Space Flight Center (MSFC) Systems Engineering Guide (SEG), a virtual systems engineering handbook and archive that will describe the system engineering processes that are used by MSFC in the development of complex systems such as the Ares launch vehicle. It is the intent of this website to be a "One Stop Shop" for our systems engineers that will provide tutorial information, an overview of processes and procedures and links to assist system engineering with guidance and

  3. Treatment planning systems dosimetry auditing project in Portugal.

    PubMed

    Lopes, M C; Cavaco, A; Jacob, K; Madureira, L; Germano, S; Faustino, S; Lencart, J; Trindade, M; Vale, J; Batel, V; Sousa, M; Bernardo, A; Brás, S; Macedo, S; Pimparel, D; Ponte, F; Diaz, E; Martins, A; Pinheiro, A; Marques, F; Batista, C; Silva, L; Rodrigues, M; Carita, L; Gershkevitsh, E; Izewska, J

    2014-02-01

    The Medical Physics Division of the Portuguese Physics Society (DFM_SPF) in collaboration with the IAEA, carried out a national auditing project in radiotherapy, between September 2011 and April 2012. The objective of this audit was to ensure the optimal usage of treatment planning systems. The national results are presented in this paper. The audit methodology simulated all steps of external beam radiotherapy workflow, from image acquisition to treatment planning and dose delivery. A thorax CIRS phantom lend by IAEA was used in 8 planning test-cases for photon beams corresponding to 15 measuring points (33 point dose results, including individual fields in multi-field test cases and 5 sum results) in different phantom materials covering a set of typical clinical delivery techniques in 3D Conformal Radiotherapy. All 24 radiotherapy centers in Portugal have participated. 50 photon beams with energies 4-18 MV have been audited using 25 linear accelerators and 32 calculation algorithms. In general a very good consistency was observed for the same type of algorithm in all centres and for each beam quality. The overall results confirmed that the national status of TPS calculations and dose delivery for 3D conformal radiotherapy is generally acceptable with no major causes for concern. This project contributed to the strengthening of the cooperation between the centres and professionals, paving the way to further national collaborations. Copyright © 2013 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  4. Computer aided production planning - SWZ system of order verification

    NASA Astrophysics Data System (ADS)

    Krenczyk, D.; Skolud, B.

    2015-11-01

    SWZ (System of order verification) is a computer implementation of the methodology that support fast decision making on the acceptability of a production order, which allows to determine not the best possible solution, but admissible solution that is possible to find in an acceptable time (feasible solution) and acceptable due to the existing constraints. The methodology uses the propagation of constraints techniques and reduced to test a sequence of arbitrarily selected conditions. Fulfilment of all the conditions (the conjunction) provides the ability to perform production orders. In the paper examples of the application of SWZ system comprising the steps of planning and control is presented. The obtained results allowing the determination of acceptable production flow in the system - determination of the manufacturing system parameters those that ensure execution of orders in time under the resource constraints. SWZ also allows to generate the dispatching rules as a sequence of processing operations for each production resource, performed periodically during the production flow in the system. Furthermore the example of SWZ and simulation system integration is shown. SWZ has been enhanced with a module generating files containing the script code of the system model using the internal language of simulation and visualization system.

  5. Artificial immune system for diabetes meal plans optimization

    NASA Astrophysics Data System (ADS)

    Prilianti, K. R.; Callista, P. B.; Setiawan, H.

    2017-03-01

    Type 2 diabetes mellitus is a disease that occurs because the body lacks of insulin or the insulin produced by the pancreas cannot work effectively such that the glucose level in the blood cannot well controlled. One of the most common causes of diabetes mellitus type 2 is obesity, therefore this disease can be controlled with the appropriate diet regarding to the daily calorie requirement. Hence, the level of blood glucose is maintained. Unfortunately, because the lack of proper diet education and facility, many people cannot work on proper daily healthy diet by their own. In this research Artificial Immune System algorithm was applied to build a model that help diabetes mellitus patient arrange their meal plans. The model can calculate the amount of daily calorie needed and arrange the appropriate daily meal plans based on it. The meal plans vary according to the patient calorie needs. The required input data are age, gender, weight, height, and type of patient daily main activity. The experiments show that this model has a good result. The result is already approaching the patients' daily calorie need, i.e. 97.6% (actual need is not less than 80% and not greater than 100%). Carbohydrate of the meal plan is 55-57% (actual need is not less than 45% and not greater than 60%) whereas the protein approximate 15-18% (actual need is not less than 15% and not greater than 20%) and fat of approximate 22-24% (actual need is not less than 20% and not greater than 25%).

  6. PCMDI software system: status and future plans report no. 44

    SciTech Connect

    Williams, Dean N.

    1997-08-01

    This report describes the current status and future plans of PCMDI`s software products. A complete description of each product is provided, including the product`s problem statement, purpose, requirements, design diagram, current status, future development, developers, contributors, and off-site collaborators. While it is noted that each software product can be executed as an independent process, it is important to discern that all products work together in the complete PCMDI Software Systems: A suite of software tools facilitating for the storage, diagnosis, and visualization of climate data.

  7. Integrating expert systems with dynamic programming in generation expansion planning

    SciTech Connect

    David, A.K.; Rong-da, Z.

    1989-08-01

    Interactive software developed for integrating engineering experience and judgement from the planning dept. with a powerful mathematic optimisation method is described. The excessive size of the state space generated by conventional multidimensional dynamic programming is reduced to real world engineering proportions by rule based procedures for implementing Windows in state space and Controls in policy space. Project Frames describing generation options and State Frames describing future conditions of the system are established and manipulated by rules. Dynamic programming simultaneously tracks a feasible set of sub-optimal scenarios. The program is interactive and is written in PROLOG with numerically intensive portions in C.

  8. Mission planning and execution within the mission data system

    NASA Technical Reports Server (NTRS)

    Barrett, Anthony; Knight, Russell; Morris, Richard; Rasmussen, Robert

    2004-01-01

    Not only has the number of launched spacecraft per year exploded over the past few years, but also spacecraft are getting progressively more complex, as flyby missions give way to remote orbiters, which in turn give way to rovers and other in situ explorers. To address the software issues in this expanding mission set, JPL started the Mission Data System (MDS) project, an effort to make flight software engineering more straightforward and less prone to error through the eplicit modeling of spacecraft state. This paper presents how MDS performs mission planning and execution in the context of explicitly managing spacecraft state.

  9. PLAN-IT - Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  10. Telematics enabled virtual simulation system for radiation treatment planning.

    PubMed

    Ntasis, Efthymios; Gletsos, Miltos; Mouravliansky, Nikos A; Zacharaki, Evangelia I; Vasios, Christos E; Golemati, Spyretta; Maniatis, Theofanis A; Nikita, Konstantina S

    2005-11-01

    In this paper, GALENOS, a Telematics Enabled Virtual Simulation System for Radiation Treatment Planning (RTP) is described. The design architecture of GALENOS is in accordance with the dual aim of virtual simulation of RTP, i.e. to allow (a) delineation of target volume and critical organs, and (b) placement of irradiation fields. An important feature of GALENOS is the possibility for on-line tele-collaboration between health care professionals under a secure framework. The advantages of GALENOS include elimination of patient transfers between departments and health care institutions as well as availability of patient data at sites different than those of his/her physical presence.

  11. PLAN-IT: Scheduling assistant for solar system exploration

    NASA Technical Reports Server (NTRS)

    Dias, William C.; Henricks, Julia A.; Wong, Jennifer C.

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered.

  12. Intelligent control system of trajectory planning for a welding robot

    NASA Astrophysics Data System (ADS)

    Wang, YueHai; Chi, Ning

    2013-03-01

    Trajectory planning for the welding robot manipulator plays an important role at the intelligent control of industrial robot. The traditional robot welding method, which based on an antique welding process, was hard to control the robot intelligently. As a result, it can't meet the industrial demand of high efficiency and low energy consumption well. This paper, based on the Denavit-Hartenberg theory and Hamilton circuit ideas, optimizes the welding robot's welding task from the system energy and time respectively. The ability of self-study on track programming for manipulator was effective of industrial demand. Robot welding chip verified that this control algorithm.

  13. Coastal Floods: Urban Planning as a Resilience System

    NASA Astrophysics Data System (ADS)

    Diez Gonzalez, J. J.; Esteban, M. D.; Monnot, J. V.; López Gutiérrez, J. S.; Negro Valdecantos, V.; Calderón, E. J.; Márquez Paniagua, P.; Silvestre, J. M.

    2012-04-01

    Despite some research efforts can be found across the literature, FRe system (Flood resilient system) is still a vaguely defined concept. Therefore, a comprehensive presentation of existing FRe systems would provide valuable contribution in order to illuminate objects laying behind this term. A systematical literature review scanning existing FRe objects will submerge us in a melting pot involving an extremely wide and heterogeneous range of elements like land planning, opening barriers, river channeling, rain forecasting… Carrying out an analyze of the resulting matter and focusing on the nature and spatial range of application of each element, a FRe objects comprehensive typology will be sorted out, leading into the end to a better understanding of the ways human societies can improve their resilience against floods. Coastal areas have been characterized by an urban expansion due mainly to the increase and displacement of the population, being this process highly increasing during the last century. On the other hand, climate has been changing leading to the increase of coastal floods, through both sea level rise and several meteorological phenomena accentuation. And also, other longer term local/regional coastal changes, most occasionally favoring floods, interfere leading to more frequent and intense flood risks and damages. As "living with floods" became an objective in many coastal cities, the previous clas-sification will be put into practice focusing on one particular FRe system scale: Urban Flood Resilience. This resilience can be achieved by means of planning procedures and building infrastructures, but in many cases these measures cannot be enough, having to be complemented with different technologies and systems. With suitable applications, Flood Resilience Systems substantially reduce damages, costs and health impacts associated with flood hazards. The importance of the urban planning as a Flood Resilience System in coastal areas will be analyzed in

  14. An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

    NASA Technical Reports Server (NTRS)

    Padolewski, Cathy L.; Bower, Amy; Ponikvar, Gary; Mellott, Ken

    1997-01-01

    In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

  15. An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

    NASA Technical Reports Server (NTRS)

    Padolewski, Cathy L.; Bower, Amy; Ponikvar, Gary; Mellott, Ken

    1997-01-01

    In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

  16. LORENZ: a system for planning long-bone fracture reduction

    NASA Astrophysics Data System (ADS)

    Birkfellner, Wolfgang; Burgstaller, Wolfgang; Wirth, Joachim; Baumann, Bernard; Jacob, Augustinus L.; Bieri, Kurt; Traud, Stefan; Strub, Michael; Regazzoni, Pietro; Messmer, Peter

    2003-05-01

    Long bone fractures belong to the most common injuries encountered in clinical routine trauma surgery. Preoperative assessment and decision making is usually based on standard 2D radiographs of the injured limb. Taking into account that a 3D - imaging modality such as computed tomography (CT) is not used for diagnosis in clinical routine, we have designed LORENZ, a fracture reduction planning tool based on such standard radiographs. Taking into account the considerable success of so-called image free navigation systems for total knee replacement in orthopaedic surgery, we assume that a similar tool for long bone fracture reposition should have considerable impact on computer-aided trauma surgery in a standard clinical routine setup. The case for long bone fracture reduction is, however, somewhat more complicated since not only scale independent angles indicating biomechanical measures such as varus and valgus are involved. Reduction path planning requires that the individual anatomy and the classification of the fracture is taken into account. In this paper, we present the basic ideas of this planning tool, it's current state, and the methodology chosen. LORENZ takes one or more conventional radiographs of the broken limb as input data. In addition, one or more x-rays of the opposite healthy bone are taken and mirrored if necessary. A most adequate CT model is being selected from a database; currently, this is achieved by using a scale space approach on the digitized x-ray images and comparing standard perspective renderings to these x-rays. After finding a CT-volume with a similar bone, a triangulated surface model is generated, and the surgeon can break the bone and arrange the fragments in 3D according to the x-ray images of the broken bone. Common osteosynthesis plates and implants can be loaded from CAD-datasets and are visualized as well. In addition, LORENZ renders virtual x-ray views of the fracture reduction process. The hybrid surface/voxel rendering

  17. Modeling of Task Planning for Multirobot System Using Reputation Mechanism

    PubMed Central

    Shi, Zhiguo; Tu, Jun; Li, Yuankai; Wei, Junming

    2014-01-01

    Modeling of task planning for multirobot system is developed from two parts: task decomposition and task allocation. In the part of task decomposition, the conditions and processes of decomposition are elaborated. In the part of task allocation, the collaboration strategy, the framework of reputation mechanism, and three types of reputations are defined in detail, which include robot individual reputation, robot group reputation, and robot direct reputation. A time calibration function and a group calibration function are designed to improve the effectiveness of the proposed method and proved that they have the characteristics of time attenuation, historical experience related, and newly joined robot reward. Tasks attempt to be assigned to the robot with higher overall reputation, which can help to increase the success rate of the mandate implementation, thereby reducing the time of task recovery and redistribution. Player/Stage is used as the simulation platform, and three biped-robots are established as the experimental apparatus. The experimental results of task planning are compared with the other allocation methods. Simulation and experiment results illustrate the effectiveness of the proposed method for multi-robot collaboration system. PMID:24672379

  18. Modeling of task planning for multirobot system using reputation mechanism.

    PubMed

    Shi, Zhiguo; Tu, Jun; Li, Yuankai; Wei, Junming

    2014-01-01

    MOdeling of task planning for multirobot system is developed from two parts: task decomposition and task allocation. In the part of task decomposition, the conditions and processes of decomposition are elaborated. In the part of task allocation, the collaboration strategy, the framework of reputation mechanism, and three types of reputations are defined in detail, which include robot individual reputation, robot group reputation, and robot direct reputation. A time calibration function and a group calibration function are designed to improve the effectiveness of the proposed method and proved that they have the characteristics of time attenuation, historical experience related, and newly joined robot reward. Tasks attempt to be assigned to the robot with higher overall reputation, which can help to increase the success rate of the mandate implementation, thereby reducing the time of task recovery and redistribution. Player/Stage is used as the simulation platform, and three biped-robots are established as the experimental apparatus. The experimental results of task planning are compared with the other allocation methods. Simulation and experiment results illustrate the effectiveness of the proposed method for multi-robot collaboration system.

  19. The Design, Planning and Control of Robotic Systems in Space

    NASA Technical Reports Server (NTRS)

    Dubowsky, Steven

    1996-01-01

    In the future, robotic systems will be expected to perform important tasks in space, in orbit and in planetary exploration. In orbit, current technology requires that tasks such as the repair, construction and maintenance of space stations and satellites be performed by astronaut Extra Vehicular Activity (EVA). Eliminating, the need for astronaut EVA through the use of space manipulators would greatly reduce both mission costs and hazards to astronauts. In planetary exploration, cost and logistical considerations clearly make the use of autonomous and telerobotic systems also very attractive, even in cases where an astronaut explorer might be in the area. However, such applications introduce a number of technical problems not found in conventional earth-bound industrial robots. To design useful and practical systems to meet the needs of future space missions, substantial technical development is required, including in the areas of the design, control and planning. The objectives of this research program were to develop such design paradigms and control and planning algorithms to enable future space robotic systems to meet their proposed mission objectives. The underlying intellectual focus of the program is to construct a set of integrated design, planning and control techniques based on an understanding of the fundamental mechanics of space robotic systems. This work was to build upon the results obtained in our previous research in this area supported by NASA Langley Research Center in which we have made important contributions to the area of space robotics. This program was proposed and accepted as a three year research program, a period of time necessary to make the type of fundamental developments to make a significant contributions to space robotics. Unfortunately, less than a year into the program it became clear that the NASA Langley Research Center would be forced by budgetary constraints to essentially leave this area of research. As a result, the total

  20. Defining and representing events in a satellite scheduling system - The IEPS (Interactive Experimenter Planning System) approach

    NASA Astrophysics Data System (ADS)

    McLean, David R.; Littlefield, Ronald G.; Macoughtry, William O.

    A methodology is described for defining and representing satellite events from the IEPS perspective. The task of doing this is divided into four categories and includes defining and representing resource windows, event parameters, event scheduling strategies, and event constraints. The description of each of these categories includes examples from the IEPS ERBS-TDRSS Contact Planning System. This is a system which is being used by the Earth Radiation Budget Satellite (ERBS) schedulers to request TDRSS contact times from the NCC. The system is written in the C programming language and uses a custom built inference engine (TIE1) to do constraint checking and a custom built strategies interpreter to derive the plan. The planning system runs on the IBM-PC/AT or on any similar hardware which has a C development environment and 640K of memory.

  1. Defining and representing events in a satellite scheduling system - The IEPS (Interactive Experimenter Planning System) approach

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Littlefield, Ronald G.; Macoughtry, William O.

    1987-01-01

    A methodology is described for defining and representing satellite events from the IEPS perspective. The task of doing this is divided into four categories and includes defining and representing resource windows, event parameters, event scheduling strategies, and event constraints. The description of each of these categories includes examples from the IEPS ERBS-TDRSS Contact Planning System. This is a system which is being used by the Earth Radiation Budget Satellite (ERBS) schedulers to request TDRSS contact times from the NCC. The system is written in the C programming language and uses a custom built inference engine (TIE1) to do constraint checking and a custom built strategies interpreter to derive the plan. The planning system runs on the IBM-PC/AT or on any similar hardware which has a C development environment and 640K of memory.

  2. Defining and representing events in a satellite scheduling system - The IEPS (Interactive Experimenter Planning System) approach

    NASA Technical Reports Server (NTRS)

    Mclean, David R.; Littlefield, Ronald G.; Macoughtry, William O.

    1987-01-01

    A methodology is described for defining and representing satellite events from the IEPS perspective. The task of doing this is divided into four categories and includes defining and representing resource windows, event parameters, event scheduling strategies, and event constraints. The description of each of these categories includes examples from the IEPS ERBS-TDRSS Contact Planning System. This is a system which is being used by the Earth Radiation Budget Satellite (ERBS) schedulers to request TDRSS contact times from the NCC. The system is written in the C programming language and uses a custom built inference engine (TIE1) to do constraint checking and a custom built strategies interpreter to derive the plan. The planning system runs on the IBM-PC/AT or on any similar hardware which has a C development environment and 640K of memory.

  3. Short-Term Planning of Hybrid Power System

    NASA Astrophysics Data System (ADS)

    Knežević, Goran; Baus, Zoran; Nikolovski, Srete

    2016-07-01

    In this paper short-term planning algorithm for hybrid power system consist of different types of cascade hydropower plants (run-of-the river, pumped storage, conventional), thermal power plants (coal-fired power plants, combined cycle gas-fired power plants) and wind farms is presented. The optimization process provides a joint bid of the hybrid system, and thus making the operation schedule of hydro and thermal power plants, the operation condition of pumped-storage hydropower plants with the aim of maximizing profits on day ahead market, according to expected hourly electricity prices, the expected local water inflow in certain hydropower plants, and the expected production of electrical energy from the wind farm, taking into account previously contracted bilateral agreement for electricity generation. Optimization process is formulated as hourly-discretized mixed integer linear optimization problem. Optimization model is applied on the case study in order to show general features of the developed model.

  4. Superconductivity for electric systems program plan, FY 1996--FY 2000

    SciTech Connect

    1996-03-01

    This describes a comprehensive, integrated approach for the development of HTS (high-temperature superconductivity) technology for cost-effective use in electric power applications. This approach supports the program`s mission: to develop the technology that could lead to industrial commercialization of HTS electric power applications, such as fault-current limiters, motors, generators, transmission cables, superinductors, and superconducting energy storage. The vision is that, by 2010, the US power systems equipment industry will regain a major share of the global market by offering superconducting products that outperform the competition; and in US, the power grid will gain increased efficiency and stability by incorporating many kinds of HTS devices. After an overview and a discussion of the program plan (wires, systems technology, partnership initiative), this document discusses technology status, stakeholders, and the role of US DOE.

  5. Production roll out plan for HANDI 2000 business management system

    SciTech Connect

    Adams, D.E.

    1998-09-29

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of Passport (PP) and PeopleSoft (PS) software, supports finance, supply, human resources, and payroll activities under the current PHMC direction. The PP software is an integrated application for Accounts Payable, Contract Management, Inventory Management, Purchasing and Material Safety Data Sheets (MSDS). The PS software is an integrated application for Projects, General Ledger, Human Resources Training, Payroll, and Base Benefits. This set of software constitutes the Business Management System (BMS) and MSDS, a subset of the HANDI 2000 suite of systems. The primary objective of the Production Roll Out Plan is to communicate the methods and schedules for implementation and roll out to end users of BMS.

  6. Satellite Situation Center data system for magnetospheric science planning

    SciTech Connect

    Aist-Sagara, L.; Cooper, J.F.; Mcguire, R.E.; Parthasarathy, R.; Peredo, M.

    1995-01-01

    Critical problems in planning coordinated observation campaigns for magnetospheric science include the need to predict time intervals when one or more observing satellites or ground stations will be connected along magnetic field lines to other observation sites, or when such sites will be located within magnetospheric regions of common interest. The Satellite Situation Center (SSC) was created at the National Space Science Data Center (NSSDC) during the International Magnetospheric Study in the 1970s to address these problems. The SSC Data System has evolved since that era to support potentially complex queries by SSC staff and has now been opened to NASA Science Internet access via the NSSDC On-line Data Information System (NODIS). The SSC software, ephemeris data base, and access modes are described for the Version 2.1 release in 1993.

  7. Standard review plan for dry cask storage systems. Final report

    SciTech Connect

    1997-01-01

    The Standard Review Plan (SRP) For Dry Cask Storage Systems provides guidance to the Nuclear Regulatory Commission staff in the Spent Fuel Project Office for performing safety reviews of dry cask storage systems. The SRP is intended to ensure the quality and uniformity of the staff reviews, present a basis for the review scope, and clarification of the regulatory requirements. Part 72, Subpart B generally specifies the information needed in a license application for the independent storage of spent nuclear fuel and high level radioactive waste. Regulatory Guide 3.61 {open_quotes}Standard Format and Content for a Topical Safety Analysis Report for a Spent Fuel Dry Storage Cask{close_quotes} contains an outline of the specific information required by the staff. The SRP is divided into 14 sections which reflect the standard application format. Regulatory requirements, staff positions, industry codes and standards, acceptance criteria, and other information are discussed.

  8. Satellite Situation Center data system for magnetospheric science planning

    NASA Technical Reports Server (NTRS)

    Aist-Sagara, L.; Cooper, J. F.; McGuire, R. E.; Parthasarathy, R.; Peredo, M.

    1995-01-01

    Critical problems in planning coordinated observation campaigns for magnetospheric science include the need to predict time intervals when one or more observing satellites or ground stations will be connected along magnetic field lines to other observation sites, or when such sites will be located within magnetospheric regions of common interest. The Satellite Situation Center (SSC) was created at the National Space Science Data Center (NSSDC) during the International Magnetospheric Study in the 1970s to address these problems. The SSC Data System has evolved since that era to support potentially complex queries by SSC staff and has now been opened to NASA Science Internet access via the NSSDC On-line Data Information System (NODIS). The SSC software, ephemeris data base, and access modes are described for the Version 2.1 release in 1993.

  9. Distributed autonomous systems: resource management, planning, and control algorithms

    NASA Astrophysics Data System (ADS)

    Smith, James F., III; Nguyen, ThanhVu H.

    2005-05-01

    Distributed autonomous systems, i.e., systems that have separated distributed components, each of which, exhibit some degree of autonomy are increasingly providing solutions to naval and other DoD problems. Recently developed control, planning and resource allocation algorithms for two types of distributed autonomous systems will be discussed. The first distributed autonomous system (DAS) to be discussed consists of a collection of unmanned aerial vehicles (UAVs) that are under fuzzy logic control. The UAVs fly and conduct meteorological sampling in a coordinated fashion determined by their fuzzy logic controllers to determine the atmospheric index of refraction. Once in flight no human intervention is required. A fuzzy planning algorithm determines the optimal trajectory, sampling rate and pattern for the UAVs and an interferometer platform while taking into account risk, reliability, priority for sampling in certain regions, fuel limitations, mission cost, and related uncertainties. The real-time fuzzy control algorithm running on each UAV will give the UAV limited autonomy allowing it to change course immediately without consulting with any commander, request other UAVs to help it, alter its sampling pattern and rate when observing interesting phenomena, or to terminate the mission and return to base. The algorithms developed will be compared to a resource manager (RM) developed for another DAS problem related to electronic attack (EA). This RM is based on fuzzy logic and optimized by evolutionary algorithms. It allows a group of dissimilar platforms to use EA resources distributed throughout the group. For both DAS types significant theoretical and simulation results will be presented.

  10. Microgrids and distributed generation systems: Control, operation, coordination and planning

    NASA Astrophysics Data System (ADS)

    Che, Liang

    Distributed Energy Resources (DERs) which include distributed generations (DGs), distributed energy storage systems, and adjustable loads are key components in microgrid operations. A microgrid is a small electric power system integrated with on-site DERs to serve all or some portion of the local load and connected to the utility grid through the point of common coupling (PCC). Microgrids can operate in both grid-connected mode and island mode. The structure and components of hierarchical control for a microgrid at Illinois Institute of Technology (IIT) are discussed and analyzed. Case studies would address the reliable and economic operation of IIT microgrid. The simulation results of IIT microgrid operation demonstrate that the hierarchical control and the coordination strategy of distributed energy resources (DERs) is an effective way of optimizing the economic operation and the reliability of microgrids. The benefits and challenges of DC microgrids are addressed with a DC model for the IIT microgrid. We presented the hierarchical control strategy including the primary, secondary, and tertiary controls for economic operation and the resilience of a DC microgrid. The simulation results verify that the proposed coordinated strategy is an effective way of ensuring the resilient response of DC microgrids to emergencies and optimizing their economic operation at steady state. The concept and prototype of a community microgrid that interconnecting multiple microgrids in a community are proposed. Two works are conducted. For the coordination, novel three-level hierarchical coordination strategy to coordinate the optimal power exchanges among neighboring microgrids is proposed. For the planning, a multi-microgrid interconnection planning framework using probabilistic minimal cut-set (MCS) based iterative methodology is proposed for enhancing the economic, resilience, and reliability signals in multi-microgrid operations. The implementation of high-reliability microgrids

  11. Manned orbital systems concepts study. Book 3: Configurations for extended duration missions. [mission planning and project planning for space missions

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Mission planning, systems analysis, and design concepts for the Space Shuttle/Spacelab system for extended manned operations are described. Topics discussed are: (1) payloads, (2) spacecraft docking, (3) structural design criteria, (4) life support systems, (5) power supplies, and (6) the role of man in long duration orbital operations. Also discussed are the assembling of large structures in space. Engineering drawings are included.

  12. Comprehensive Planning for an Education System. Report #2, Definition Summary. Fort Lincoln New Town Education System.

    ERIC Educational Resources Information Center

    General Learning Corp., Washington, DC.

    Presented are program alternatives for operating an innovative school system for Fort Lincoln New Town (FLNT) in Washington, D.C. General Learning Corp (GLC), retained by the school system, offers this report of the "definition phase" of the planning effort during which community residents, D.C. Schools, Government agencies, GLC, and others…

  13. Planning and Social Systems: Organizations as a Special Case. A CRUSK-ISR Working Paper.

    ERIC Educational Resources Information Center

    Crowfoot, James E.

    This paper attempts to provide a broad theoretical framework for understanding planning in organizations and other social systems; and it identifies the key conditions, processes, and structures of social systems in the planning concept. While other frameworks exist that detail singular aspects of planning as it actually occurs and describe…

  14. State University System of Florida Board of Governors Strategic Plan 2005-2013

    ERIC Educational Resources Information Center

    Board of Governors, State University System of Florida, 2005

    2005-01-01

    On June 9, 2005, the Board of Governors adopted the State University System of Florida Strategic Plan 2005-2013. This plan provides for a systematic and ongoing evaluation of the quality and effectiveness of state universities. As established in the Strategic Plan, goals for the system for 2012-2013 include: Goal 1: Access to and production of…

  15. Implementation of an interactive liver surgery planning system

    NASA Astrophysics Data System (ADS)

    Wang, Luyao; Liu, Jingjing; Yuan, Rong; Gu, Shuguo; Yu, Long; Li, Zhitao; Li, Yanzhao; Li, Zhen; Xie, Qingguo; Hu, Daoyu

    2011-03-01

    Liver tumor, one of the most wide-spread diseases, has a very high mortality in China. To improve success rates of liver surgeries and life qualities of such patients, we implement an interactive liver surgery planning system based on contrastenhanced liver CT images. The system consists of five modules: pre-processing, segmentation, modeling, quantitative analysis and surgery simulation. The Graph Cuts method is utilized to automatically segment the liver based on an anatomical prior knowledge that liver is the biggest organ and has almost homogeneous gray value. The system supports users to build patient-specific liver segment and sub-segment models using interactive portal vein branch labeling, and to perform anatomical resection simulation. It also provides several tools to simulate atypical resection, including resection plane, sphere and curved surface. To match actual surgery resections well and simulate the process flexibly, we extend our work to develop a virtual scalpel model and simulate the scalpel movement in the hepatic tissue using multi-plane continuous resection. In addition, the quantitative analysis module makes it possible to assess the risk of a liver surgery. The preliminary results show that the system has the potential to offer an accurate 3D delineation of the liver anatomy, as well as the tumors' location in relation to vessels, and to facilitate liver resection surgeries. Furthermore, we are testing the system in a full-scale clinical trial.

  16. A treatment planning study comparing Elekta VMAT and fixed field IMRT using the varian treatment planning system eclipse.

    PubMed

    Peters, Samuel; Schiefer, Hans; Plasswilm, Ludwig

    2014-07-10

    The newest release of the Eclipse (Varian) treatment planning system (TPS) includes an optimizing engine for Elekta volumetric-modulated arc therapy (VMAT) planning. The purpose of this study was to evaluate this new algorithm and to compare it to intensity-modulated radiation therapy (IMRT) for various disease sites by creating single- and double-arc VMAT plans. A total of 162 plans were evaluated in this study, including 38 endometrial, 57 head and neck, 12 brain, 10 breast and 45 prostate cancer cases. The real-life IMRT plans were developed during routine clinical cases using the TPS Eclipse. VMAT plans were generated using a preclinical version of Eclipse with tumor-region-specific optimizing templates without interference of the operator: with one full arc (1A) and with two full arcs (2A), and with partial arcs for breast and prostate with hip implant cases. All plans were evaluated based on target coverage, homogeneity and conformity. The organs at risk (OARs) were analyzed according to plan objectives, such as the mean and maximum doses. If one or more objectives were exceeded, the plan was considered clinically unacceptable, and a second VMAT plan was created by adapting the optimization penalties once. Compared to IMRT, single- and double-arc VMAT plans showed comparable or better results concerning the target coverage: the maximum dose in the target for 1A is the same as that for IMRT; for 2A, an average reduction of 1.3% over all plans was observed. The conformity showed a statistically significant improvement for both 1A (+3%) and 2A (+6%). The mean total body dose was statistically significant lower for the considered arc techniques (IMRT: 16.0 Gy, VMAT: 15.3 Gy, p < 0.001). However, the sparing of OARs shows individual behavior that depends strongly on the different tumor regions. A clear difference is found in the number of monitor units (MUs) per plan: VMAT shows a reduction of 31%. These findings demonstrate that based on optimizing

  17. Information systems for the materials management department: stand-alone and enterprise resource planning systems.

    PubMed

    2005-03-01

    Materials management information systems (MMISs) incorporate information tools that hospitals can use to automate certain business processes, increase staff compliance with these processes, and identify opportunities for cost savings. Recently, there has been a push by hospital administration to purchase enterprise resource planning (ERP) systems, information systems that promise to integrate many more facets of healthcare business. We offer this article to help materials managers, administrators, and others involved with information system selection understand the changes that have taken place in materials management information systems, decide whether they need a new system and, if so, whether a stand-alone MMIS or an ERP system will be the best choice.

  18. Analysis and preliminary design of Kunming land use and planning management information system

    NASA Astrophysics Data System (ADS)

    Li, Li; Chen, Zhenjie

    2007-06-01

    This article analyzes Kunming land use planning and management information system from the system building objectives and system building requirements aspects, nails down the system's users, functional requirements and construction requirements. On these bases, the three-tier system architecture based on C/S and B/S is defined: the user interface layer, the business logic layer and the data services layer. According to requirements for the construction of land use planning and management information database derived from standards of the Ministry of Land and Resources and the construction program of the Golden Land Project, this paper divides system databases into planning document database, planning implementation database, working map database and system maintenance database. In the design of the system interface, this paper uses various methods and data formats for data transmission and sharing between upper and lower levels. According to the system analysis results, main modules of the system are designed as follows: planning data management, the planning and annual plan preparation and control function, day-to-day planning management, planning revision management, decision-making support, thematic inquiry statistics, planning public participation and so on; besides that, the system realization technologies are discussed from the system operation mode, development platform and other aspects.

  19. Tank waste remediation system integrated technology plan. Revision 2

    SciTech Connect

    Eaton, B.; Ignatov, A.; Johnson, S.; Mann, M.; Morasch, L.; Ortiz, S.; Novak, P.

    1995-02-28

    The Hanford Site, located in southeastern Washington State, is operated by the US Department of Energy (DOE) and its contractors. Starting in 1943, Hanford supported fabrication of reactor fuel elements, operation of production reactors, processing of irradiated fuel to separate and extract plutonium and uranium, and preparation of plutonium metal. Processes used to recover plutonium and uranium from irradiated fuel and to recover radionuclides from tank waste, plus miscellaneous sources resulted in the legacy of approximately 227,000 m{sup 3} (60 million gallons) of high-level radioactive waste, currently in storage. This waste is currently stored in 177 large underground storage tanks, 28 of which have two steel walls and are called double-shell tanks (DSTs) an 149 of which are called single-shell tanks (SSTs). Much of the high-heat-emitting nuclides (strontium-90 and cesium-137) has been extracted from the tank waste, converted to solid, and placed in capsules, most of which are stored onsite in water-filled basins. DOE established the Tank Waste Remediation System (TWRS) program in 1991. The TWRS program mission is to store, treat, immobilize and dispose, or prepare for disposal, the Hanford tank waste in an environmentally sound, safe, and cost-effective manner. Technology will need to be developed or improved to meet the TWRS program mission. The Integrated Technology Plan (ITP) is the high-level consensus plan that documents all TWRS technology activities for the life of the program.

  20. Geographic Information System Tools for Conservation Planning: User's Manual

    USGS Publications Warehouse

    Fox, Timothy J.; Rohweder, Jason J.; Kenow, K.P.; Korschgen, C.E.; DeHaan, H.C.

    2003-01-01

    Public and private land managers desire better ways to incorporate landscape, species, and habitat relations into their conservation planning processes. We present three tools, developed for the Environmental Systems Research Institute?s ArcView 3.x platform, applicable to many types of wildlife conservation management and planning efforts. These tools provide managers and planners with the ability to rapidly assess landscape attributes and link these attributes with species-habitat information. To use the tools, the user provides a detailed land cover spatial database and develops a matrix to identify species-habitat relations for the landscape of interest. The tools are applicable to any taxa or suite of taxa for which the required data are available. The user also has the ability to interactively make polygon-specific changes to the landscape and re-examine species-habitat relations. The development of these tools has given resource managers the means to evaluate the merits of proposed landscape management scenarios and to choose the scenario that best fits the goals of the managed area.