Science.gov

Sample records for geh-10-43 nini interim

  1. The evolution of phase transformation in Ni/Ni3Al laminated composite under high temperature treatments

    NASA Astrophysics Data System (ADS)

    Shmorgun, V.; Gurevich, L.; Bogdanov, A.; Trunov, M.

    2016-02-01

    In this study the impact of isothermal annealing on the phase transformation rate in laminated Ni/Ni2Al3 composite was investigated. The method of nickel-aluminide coatings of the required chemical composition fabrication was proposed.

  2. Microstructure and mechanical properties of sputter deposited Ni/Ni3Al multilayer films at elevated temperature

    NASA Astrophysics Data System (ADS)

    Zhang, Chao; Feng, Kai; Li, Zhuguo; Lu, Fenggui; Huang, Jian; Wu, Yixiong

    2016-08-01

    Nano-structured Ni/Ni3Al multilayer was prepared by magnetron sputtering, with individual layer thicknesses h varying from 10 to 160 nm. The microstructure and hardness of Ni/Ni3Al multilayer were investigated by X-ray diffraction, transmission electron microscopy and nanoindentation. The results show that the hardness increases with decreasing h for as-deposited and 500 °C annealed multilayers. When annealed at 700 °C, the hardness approach a peak value at h = 40 nm with followed by softening at smaller h. The influence of individual layer thickness, grain size as well as formation of ordered Ni3Al on strengthening mechanisms of Ni/Ni3Al multilayers at elevated temperature are discussed.

  3. K{sup 0} and {lambda} production in Ni+Ni collisions near threshold

    SciTech Connect

    Merschmeyer, M.; Herrmann, N.; Benabderrahmane, M. L.; Cordier, E.; Mangiarotti, A.; Pelte, D.; Xiao, Z. G.; Lopez, X.; Andronic, A.; Hartmann, O. N.; Hildenbrand, K. D.; Koczon, P.; Leifels, Y.; Reisdorf, W.; Schuettauf, A.; Bastid, N.; Crochet, P.; Barret, V.; Dupieux, P.

    2007-08-15

    New results concerning the production of neutral strange particles, K{sup 0} and {lambda} in Ni+Ni collisions at 1.93A GeV, measured with the FOPI detector at GSI Darmstadt, are presented. Rapidity density distributions and Boltzmann slope parameter distributions are measured in nearly the full phase space of the reaction. The observables are compared to existing K{sup +} and proton data. While the K{sup 0} data agree with previously reported K{sup +} measurements, the {lambda} distributions show a different behavior relative to that of protons. The strangeness balance and the production yield per participating nucleon as a function of the centrality of the reaction are discussed, for the first time at GSI Schwerionen Synchrotron (SIS) energies.

  4. Interim report

    SciTech Connect

    1985-06-01

    This Interim Report summarizes the research and development activities of the Superconducting Super Collider project carried out from the completion of the Reference Designs Study (May 1984) to June 1985. It was prepared by the SSC Central Design Group in draft form on the occasion of the DOE Annual Review, June 19--21, 1985. Now largely organized by CDG Divisions, the bulk of each chapter documents the progress and accomplishments to date, while the final section(s) describe plans for future work. Chapter 1, Introduction, provides a basic brief description of the SSC, its physics justification, its origins, and the R&D organization set up to carry out the work. Chapter 2 gives a summary of the main results of the R&D program, the tasks assigned to the four magnet R&D centers, and an overview of the future plans. The reader wishing a quick look at the SSC Phase I effort can skim Chapter 1 and read Chapter 2. Subsequent chapters discuss in more detail the activities on accelerator physics, accelerator systems, magnets and cryostats, injector, detector R&D, conventional facilities, and project planning and management. The magnet chapter (5) documents in text and photographs the impressive progress in successful construction of many model magnets, the development of cryostats with low heat leaks, and the improvement in current-carrying capacity of superconducting strand. Chapter 9 contains the budgets and schedules of the COG Divisions, the overall R&D program, including the laboratories, and also preliminary projections for construction. Appendices provide information on the various panels, task forces and workshops held by the CDG in FY 1985, a bibliography of COG and Laboratory reports on SSC and SSC-related work, and on private industrial involvement in the project.

  5. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  6. Statistics of Interatomic Ni-Ni Bonds in Ni-BASED Ternary Solid Solutions with Non-Magnetic Elements and Their Magnetic Behavior

    NASA Astrophysics Data System (ADS)

    Cosma, I.; Culea, E.; Fechete, R.; NicoarǍ, S.

    The drop of ferromagnetic moment in the ternary solid solutions Ni1-x-yCuxDy, (D = Zn, Si, Au, Al) is analyzed in terms of the statistical model of the environment-dependent moments. This probabilistic model shows that the disappearing of one Ni atom ferromagnetic moment can be assigned to the replacement of at least four Ni-Ni bindings, out of twelve, in pure nickel. This paper aims at discussing all these features that, from the point of view of macroscopic equilibrium states, are related to the distribution of local bonds, provided by the peripheral electrons of the substitute atoms dissolved in the Ni matrix.

  7. Intel International Interim Report

    ERIC Educational Resources Information Center

    Martin, Wendy; Mandinach, Ellen; Kanaya, Tomoe; Culp, Katie McMillan

    2004-01-01

    This interim report presents preliminary data and observations from evaluations of Intel Teach to the Future being conducted around the world, and recommendations for building and refining this evaluation portfolio to ensure that findings will be instructive at the local, national and international level. The data presented here reflect the…

  8. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Bureau of Indian Affairs Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines... publication of the Interim BIA Adult Detention Facility Guidelines and the Interim Model Deputation Agreements... Interim BIA Adult Detention Facility Guidelines and Interim Model Deputation Agreements are effective...

  9. CMM Interim Check (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interim check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.

  10. Evidence that NiNi acetyl-CoA synthase is active and that the CuNi enzyme is not.

    PubMed

    Seravalli, Javier; Xiao, Yuming; Gu, Weiwei; Cramer, Stephen P; Antholine, William E; Krymov, Vladimir; Gerfen, Gary J; Ragsdale, Stephen W

    2004-04-01

    The bifunctional CO dehydrogenase/acetyl-CoA synthase (CODH/ACS) plays a central role in the Wood-Ljungdahl pathway of autotrophic CO(2) fixation. One structure of the Moorella thermoacetica enzyme revealed that the active site of ACS (the A-cluster) consists of a [4Fe-4S] cluster bridged to a binuclear CuNi center with Cu at the proximal metal site (M(p)) and Ni at the distal metal site (M(d)). In another structure of the same enzyme, Ni or Zn was present at M(p). On the basis of a positive correlation between ACS activity and Cu content, we had proposed that the Cu-containing enzyme is active [Seravalli, J., et al. (2003) Proc. Natl. Acad. Sci. U.S.A. 100, 3689-3694]. Here we have reexamined this proposal. Enzyme preparations with a wider range of Ni (1.6-2.8) and Cu (0.2-1.1) stoichiometries per dimer were studied to reexamine the correlation, if any, between the Ni and Cu content and ACS activity. In addition, the effects of o-phenanthroline (which removes Ni but not Cu) and neocuproine (which removes Cu but not Ni) on ACS activity were determined. EXAFS results indicate that these chelators selectively remove M(p). Multifrequency EPR spectra (3-130 GHz) of the paramagnetic NiFeC state of the A-cluster were examined to investigate the electronic state of this proposed intermediate in the ACS reaction mechanism. The combined results strongly indicate that the CuNi enzyme is inactive, that the NiNi enzyme is active, and that the NiNi enzyme is responsible for the NiFeC EPR signal. The results also support an electronic structure of the NiFeC-eliciting species as a [4Fe-4S](2+) (net S = 0) cluster bridged to a Ni(1+) (S = (1)/(2)) at M(p) that is bridged to planar four-coordinate Ni(2+) (S = 0) at M(d), with the spin predominantly on the Ni(1+). Furthermore, these studies suggest that M(p) is inserted during cell growth. The apparent vulnerability of the proximal metal site in the A-cluster to substitution with different metals appears to underlie the

  11. Interim storage study report

    SciTech Connect

    Rawlins, J.K.

    1998-02-01

    High-level radioactive waste (HLW) stored at the Idaho Chemical Processing Plant (ICPP) in the form of calcine and liquid and liquid sodium-bearing waste (SBW) will be processed to provide a stable waste form and prepare the waste to be transported to a permanent repository. Because a permanent repository will not be available when the waste is processed, the waste must be stored at ICPP in an Interim Storage Facility (ISF). This report documents consideration of an ISF for each of the waste processing options under consideration.

  12. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in...

  13. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in...

  14. Characterization of interim reference shales

    SciTech Connect

    Miknis, F.P.; Sullivan, S.; Mason, G.

    1986-03-01

    Measurements have been made on the chemical and physical properties of two oil shales designated as interim reference oil shales by the Department of Energy. One oil shale is a Green River Formation, Parachute Creek Member, Mahogany Zone Colorado oil shale from the Anvil Points mine and the other is a Clegg Creek Member, New Albany shale from Kentucky. Material balance Fischer assays, kerogen concentrates, carbon aromaticities, thermal properties, and bulk mineralogic properties have been determined for the oil shales. The measured properties of the interim reference shales are comparable to results obtained from previous studies on similar shales. The western interim reference shale has a low carbon aromaticity, high Fischer assay conversion to oil, and a dominant carbonate mineralogy. The eastern interim reference shale has a high carbon aromaticity, low Fischer assay conversion to oil, and a dominant silicate mineralogy. Chemical and physical properties, including ASTM distillations, have been determined for shale oils produced from the interim reference shales. The distillation data were used in conjunction with API correlations to calculate a large number of shale oil properties that are required for computer models such as ASPEN. The experimental determination of many of the shale oil properties was beyond the scope of this study. Therefore, direct comparison between calculated and measured values of many properties could not be made. However, molecular weights of the shale oils were measured. In this case, there was poor agreement between measured molecular weights and those calculated from API and other published correlations. 23 refs., 12 figs., 15 tabs.

  15. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  16. 19 CFR 207.106 - Interim measures.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 19 Customs Duties 3 2011-04-01 2011-04-01 false Interim measures. 207.106 Section 207.106 Customs... and Committee Proceedings § 207.106 Interim measures. (a) At any time after proceedings are initiated... that would otherwise be kept confidential, or to take other appropriate interim measures. (b)...

  17. 32 CFR 776.82 - Interim suspension.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Interim suspension. 776.82 Section 776.82... Complaint Processing Procedures § 776.82 Interim suspension. (a) Where the Rules Counsel determines there is... interim suspension, pending completion of a professional responsibility investigation. The...

  18. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  19. 32 CFR 776.82 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Interim suspension. 776.82 Section 776.82... Complaint Processing Procedures § 776.82 Interim suspension. (a) Where the Rules Counsel determines there is... interim suspension, pending completion of a professional responsibility investigation. The...

  20. 22 CFR 127.8 - Interim suspension.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Interim suspension. 127.8 Section 127.8 Foreign... Interim suspension. (a) The Managing Director of the Directorate of Defense Trade Controls or the Director of the Office of Defense Trade Controls Compliance is authorized to order the interim suspension...

  1. Structural models of the bimetallic subunit at the A-cluster of acetyl coenzyme a synthase/CO dehydrogenase: binuclear sulfur-bridged Ni-Cu and Ni-Ni complexes and their reactions with CO.

    PubMed

    Harrop, Todd C; Olmstead, Marilyn M; Mascharak, Pradip K

    2004-11-17

    The Ni(II)-dicarboxamido-dithiolato complexes (Et4N)2[Ni(NpPepS)] (1) and (Et4N)2[Ni(PhPepS)] (2) were used as Nid metallosynthons in the construction of higher nuclearity dinuclear Ni-Cu and Ni-Ni species to model the bimetallic Mp-Nid site of the A-cluster of acetyl coenzyme A synthase/CO dehydrogenase (ACS/CODH). Reaction of 1 with [Cu(neo)Cl] and [Ni(terpy)Cl2] in MeCN affords the dinuclear complexes (Et4N)[Cu(neo)Ni(NpPepS)] (3) and [Ni(terpy)Ni(NpPepS)] (4), respectively. Reaction of 2 with [Ni(dppe)Cl2] in MeCN yields [Ni(dppe)Ni(PhPepS)] (6). The Ni-Cu complex 3 exhibits no redox chemistry at the Nid site and no reaction with CO. In contrast, the Nip sites in 4 and 6 are readily reduced (characterized by their Ni(I) EPR spectra) and bind CO, exhibiting nuco bands at 2044 and 1997 cm-1, respectively, indicating terminal CO binding. The present Ni-Ni systems replicate the structural and chemical properties of the A-cluster site in ACS/CODH and support the presence of Ni at Mp in the catalytically active enzyme.

  2. Burn site groundwater interim measures work plan.

    SciTech Connect

    Witt, Jonathan L.; Hall, Kevin A.

    2005-05-01

    This Work Plan identifies and outlines interim measures to address nitrate contamination in groundwater at the Burn Site, Sandia National Laboratories/New Mexico. The New Mexico Environment Department has required implementation of interim measures for nitrate-contaminated groundwater at the Burn Site. The purpose of interim measures is to prevent human or environmental exposure to nitrate-contaminated groundwater originating from the Burn Site. This Work Plan details a summary of current information about the Burn Site, interim measures activities for stabilization, and project management responsibilities to accomplish this purpose.

  3. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... completion of the risk assessment. In units in which a child of less than 6 years of age moves in after the completion of the risk assessment, interim controls shall be completed no later than 90 days after the move... property, interim controls shall be completed no later than 12 months after completion of the...

  4. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... followed: (1) Interim construction shall be conducted in accordance with RUS Bulletin 1738-2 and 7 CFR part... be covered by an Environmental Report prepared in accordance with 7 CFR part 1794 and approved by RUS... 7 Agriculture 11 2011-01-01 2011-01-01 false Interim financing. 1738.21 Section...

  5. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... followed: (1) Interim construction shall be conducted in accordance with RUS Bulletin 1738-2 and 7 CFR part... be covered by an Environmental Report prepared in accordance with 7 CFR part 1794 and approved by RUS... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section...

  6. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this...

  11. 39 CFR 952.6 - Interim impounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Interim impounding. 952.6 Section 952.6 Postal Service UNITED STATES POSTAL SERVICE PROCEDURES RULES OF PRACTICE IN PROCEEDINGS RELATIVE TO FALSE REPRESENTATION AND LOTTERY ORDERS § 952.6 Interim impounding. In preparation for or during the pendency of...

  12. Fusion Breeder Program interim report

    SciTech Connect

    Moir, R.; Lee, J.D.; Neef, W.

    1982-06-11

    This interim report for the FY82 Fusion Breeder Program covers work performed during the scoping phase of the study, December, 1981-February 1982. The goals for the FY82 study are the identification and development of a reference blanket concept using the fission suppression concept and the definition of a development plan to further the fusion breeder application. The context of the study is the tandem mirror reactor, but emphasis is placed upon blanket engineering. A tokamak driver and blanket concept will be selected and studied in more detail during FY83.

  13. Solid waste burial grounds interim safety analysis

    SciTech Connect

    Saito, G.H.

    1994-10-01

    This Interim Safety Analysis document supports the authorization basis for the interim operation and restrictions on interim operations for the near-surface land disposal of solid waste in the Solid Waste Burial Grounds. The Solid Waste Burial Grounds Interim Safety Basis supports the upgrade progress for the safety analysis report and the technical safety requirements for the operations in the Solid Waste Burial Grounds. Accident safety analysis scenarios have been analyzed based on the significant events identified in the preliminary hazards analysis. The interim safety analysis provides an evaluation of the operations in the Solid Waste Burial Grounds to determine if the radiological and hazardous material exposures will be acceptable from an overall health and safety standpoint to the worker, the onsite personnel, the public, and the environment.

  14. Four new species of free-living marine nematodes of the family Desmodoridae (Nematoda: Desmodorida) and a redescription of Desmodora nini (Inglis, 1963) from the continental shelf off northeastern Brazil.

    PubMed

    Larrazábal-Filho, Alexandre L; Silva, Maria Cristina Da; Esteves, André M

    2015-09-24

    Four new species of marine nematodes were collected from the continental shelf of the Potiguar Basin in northeastern Brazil. Zalonema vicentei sp. n. and Zalonema mariae sp. n. are characterized by having multispiral fovea amphidialis, lateral alae and ventral ala. These features also are found in Pseudochromadora, Desmodorella and Psammonema. They differ in the cephalic arrangement, and shape of the cephalic capsule and the fovea amphidialis. Croconema fortis sp. n. resembles Desmodora in the shape of the fovea amphidialis and cephalic capsule, but differs in the number of subcephalic setae and ornamentation on the cuticule. Desmodora paraconica sp. n. is characterized by the loop-shaped fovea amphidialis and the long conical-cylindrical tail. This species is similar to the genus Bolbonema, but differs in having the cephalic setae anterior to the fovea amphidialis. Desmodora nini is redescribed, to record details lacking in the original description.

  15. Four new species of free-living marine nematodes of the family Desmodoridae (Nematoda: Desmodorida) and a redescription of Desmodora nini (Inglis, 1963) from the continental shelf off northeastern Brazil.

    PubMed

    Larrazábal-Filho, Alexandre L; Silva, Maria Cristina Da; Esteves, André M

    2015-01-01

    Four new species of marine nematodes were collected from the continental shelf of the Potiguar Basin in northeastern Brazil. Zalonema vicentei sp. n. and Zalonema mariae sp. n. are characterized by having multispiral fovea amphidialis, lateral alae and ventral ala. These features also are found in Pseudochromadora, Desmodorella and Psammonema. They differ in the cephalic arrangement, and shape of the cephalic capsule and the fovea amphidialis. Croconema fortis sp. n. resembles Desmodora in the shape of the fovea amphidialis and cephalic capsule, but differs in the number of subcephalic setae and ornamentation on the cuticule. Desmodora paraconica sp. n. is characterized by the loop-shaped fovea amphidialis and the long conical-cylindrical tail. This species is similar to the genus Bolbonema, but differs in having the cephalic setae anterior to the fovea amphidialis. Desmodora nini is redescribed, to record details lacking in the original description. PMID:26624120

  16. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 13 Business Credit and Assistance 1 2011-01-01 2011-01-01 false Source of interim financing. 120... Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may use interim financing for all Project costs except the Borrower's contribution. Any source...

  17. DOE UST interim subsurface barrier technologies workshop

    SciTech Connect

    1992-09-01

    This document contains information which was presented at a workshop regarding interim subsurface barrier technologies that could be used for underground storage tanks, particularly the tank 241-C-106 at the Hanford Reservation.

  18. Methods Data Qualification Interim Report

    SciTech Connect

    R. Sam Alessi; Tami Grimmett; Leng Vang; Dave McGrath

    2010-09-01

    The overall goal of the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) is to maintain data provenance for all NGNP data including the Methods component of NGNP data. Multiple means are available to access data stored in NDMAS. A web portal environment allows users to access data, view the results of qualification tests and view graphs and charts of various attributes of the data. NDMAS also has methods for the management of the data output from VHTR simulation models and data generated from experiments designed to verify and validate the simulation codes. These simulation models represent the outcome of mathematical representation of VHTR components and systems. The methods data management approaches described herein will handle data that arise from experiment, simulation, and external sources for the main purpose of facilitating parameter estimation and model verification and validation (V&V). A model integration environment entitled ModelCenter is used to automate the storing of data from simulation model runs to the NDMAS repository. This approach does not adversely change the why computational scientists conduct their work. The method is to be used mainly to store the results of model runs that need to be preserved for auditing purposes or for display to the NDMAS web portal. This interim report demonstrates the currently development of NDMAS for Methods data and discusses data and its qualification that is currently part of NDMAS.

  19. EMCS Retrofit Analysis - Interim Report

    SciTech Connect

    Diamond, R.C.; Salsbury, T.I.; Bell, G.C.; Huang, Y.J.; Sezgen, A.O.; Mazzucchi, R.; Romberger, J.

    1999-03-01

    This report presents the interim results of analyses carried out in the Phillip Burton Federal Building in San Francisco from 1996 to 1998. The building is the site of a major demonstration of the BACnet communication protocol. The energy management and control systems (EMCS) in the building were retrofitted with BACnet compatible controllers in order to integrate certain existing systems on one common network. In this respect, the project has been a success. Interoperability of control equipment from different manufacturers has been demonstrated in a real world environment. Besides demonstrating interoperability, the retrofits carried out in the building were also intended to enhance control strategies and capabilities, and to produce energy savings. This report presents analyses of the energy usage of HVAC systems in the building, control performance, and the reaction of the building operators. The report does not present an evaluation of the performance capabilities of the BACnet protocol. A monitoring system was installed in the building that parallels many of the EMCS sensors and data were archived over a three-year period. The authors defined pre-retrofit and post-retrofit periods and analyzed the corresponding data to establish the changes in building performance resulting from the retrofit activities. The authors also used whole-building energy simulation (DOE-2) as a tool for evaluating the effect of the retrofit changes. The results of the simulation were compared with the monitored data. Changes in operator behavior were assessed qualitatively with questionnaires. The report summarizes the findings of the analyses and makes several recommendations as to how to achieve better performance. They maintain that the full potential of the EMCS and associated systems is not being realized. The reasons for this are discussed along with possible ways of addressing this problem. They also describe a number of new technologies that could benefit systems of the type

  20. CMM Interim Check Design of Experiments (U)

    SciTech Connect

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factors (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.

  1. Design review report FFTF interim storage cask

    SciTech Connect

    Scott, P.L.

    1995-01-03

    Final Design Review Report for the FFTF Interim Storage Cask. The Interim Storage Cask (ISC) will be used for long term above ground dry storage of FFTF irradiated fuel in Core Component Containers (CCC)s. The CCC has been designed and will house assemblies that have been sodium washed in the IEM Cell. The Solid Waste Cask (SWC) will transfer a full CCC from the IEM Cell to the RSB Cask Loading Station where the ISC will be located to receive it. Once the loaded ISC has been sealed at the RSB Cask Loading Station, it will be transferred by facility crane to the DSWC Transporter. After the ISC has been transferred to the Interim Storage Area (ISA), which is yet to be designed, a mobile crane will be used to place the ISC in its final storage location.

  2. 200 Area Interim Storage Area Technical Safety Requirements

    SciTech Connect

    CARRELL, R.D.

    2000-03-15

    The 200 Area Interim Storage Area Technical Safety Requirements define administrative controls and design features required to ensure safe operation during receipt and storage of canisters containing spent nuclear fuel. This document is based on the 200 Area Interim Storage Area, Annex D, Final Safety Analysis Report which contains information specific to the 200 Area Interim Storage Area.

  3. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Source of interim financing. 120.890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project...

  4. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... 7701(b)(2)(A)(i), determines that granting interim relief is not appropriate; (e) An interim personnel... administrative judge granting interim relief under 5 U.S.C. 7701(b)(2)(A) and a petition for review of the initial decision is filed (or will be filed) with the full Board under 5 U.S.C. 7701(e)(1)(A), the...

  5. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  6. 12 CFR 541.19 - Interim state savings association.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interim state savings association. 541.19... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.19 Interim state savings association. The term interim state savings association means a savings association, other than a Federal savings...

  7. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  8. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term interim Federal savings association means a Federal savings association chartered by the Office...

  9. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  10. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  11. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 2 2012-01-01 2012-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee...

  12. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.570 Section 417... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment. (1) CMS makes monthly advance payments equivalent to the HMO's or CMP's interim per capita rate...

  13. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim per capita payments. 417.808 Section 417... PREPAYMENT PLANS Health Care Prepayment Plans § 417.808 Interim per capita payments. The HCPP follows the principles specified in §§ 417.570 and 417.572 on interim per capita payments, except for the following:...

  14. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Interim per capita payments. 417.570 Section 417... PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a) Principle of payment. (1) CMS makes monthly advance payments equivalent to the HMO's or CMP's interim per capita rate...

  15. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 3 2011-10-01 2011-10-01 false Interim per capita payments. 417.808 Section 417... PREPAYMENT PLANS Health Care Prepayment Plans § 417.808 Interim per capita payments. The HCPP follows the principles specified in §§ 417.570 and 417.572 on interim per capita payments, except for the following:...

  16. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Interim per capita payments. 417.808 Section 417... HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.808 Interim per capita payments. The HCPP follows the principles specified in §§ 417.570 and 417.572 on interim per capita payments, except for...

  17. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Interim per capita payments. 417.570 Section 417... HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a...) Determination of rate. The interim per capita rate of payment is equal to the estimated per capita cost...

  18. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 3 2012-10-01 2012-10-01 false Interim per capita payments. 417.570 Section 417... HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a...) Determination of rate. The interim per capita rate of payment is equal to the estimated per capita cost...

  19. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Interim per capita payments. 417.808 Section 417... HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.808 Interim per capita payments. The HCPP follows the principles specified in §§ 417.570 and 417.572 on interim per capita payments, except for...

  20. 42 CFR 417.808 - Interim per capita payments.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 3 2013-10-01 2013-10-01 false Interim per capita payments. 417.808 Section 417... HEALTH CARE PREPAYMENT PLANS Health Care Prepayment Plans § 417.808 Interim per capita payments. The HCPP follows the principles specified in §§ 417.570 and 417.572 on interim per capita payments, except for...

  1. 42 CFR 417.570 - Interim per capita payments.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 3 2014-10-01 2014-10-01 false Interim per capita payments. 417.570 Section 417... HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.570 Interim per capita payments. (a...) Determination of rate. The interim per capita rate of payment is equal to the estimated per capita cost...

  2. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  3. Loss of interim status (LOIS) under RCRA. RCRA Information Brief

    SciTech Connect

    Not Available

    1992-09-01

    The Resource Conservation and Recovery Act (RCRA) requires owners and operators of facilities that treat store, or disposal of hazardous waste (TSDFs) to obtain an operating permit. Recognizing that it would take EPA many years to issue operating permits to all RCRA facilities, Congress created ``interim status`` under Section 3005(e) of the Act. Interim status allows facilities to operate under Subtitle C of RCRA until their permits are issued or denied. This information brief defines interim status and describes how failure to meet interim status requirements may lead to loss of interim status (LOIS).

  4. 40 CFR 1033.150 - Interim provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 1033.150 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM LOCOMOTIVES Emission Standards and Related Requirements § 1033.150 Interim... remanufacture locomotives to meet the applicable standards in 40 CFR part 92 only if no remanufacture system...

  5. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... preliminary approval from RUS. See § 1735.90 (g) See 7 CFR part 1737 for regulations on interim financing for... completed RUS Form 490, “Application for Telephone Loan or Loan Guarantee.” See 7 CFR part 1737. (3) The... on any investments in nonrural areas. See 7 CFR 1737. (4) The information required in § 1735.74...

  6. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... preliminary approval from RUS. See § 1735.90 (g) See 7 CFR part 1737 for regulations on interim financing for... completed RUS Form 490, “Application for Telephone Loan or Loan Guarantee.” See 7 CFR part 1737. (3) The... on any investments in nonrural areas. See 7 CFR 1737. (4) The information required in § 1735.74...

  7. 340 waste handling facility interim safety basis

    SciTech Connect

    VAIL, T.S.

    1999-04-01

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  8. Diversified Satellite Occupations Program. Interim Report.

    ERIC Educational Resources Information Center

    Call, John Reed

    This interim report, covering the period of September 1970 to June 1971, describes a program conducted for elementary, junior high, and senior high grades. The elementary program was designed to help students develop an understanding of occupational competence. The prevention of dropouts and individualizing instruction were concerns of the junior…

  9. 340 Waste handling facility interim safety basis

    SciTech Connect

    Stordeur, R.T.

    1996-10-04

    This document presents an interim safety basis for the 340 Waste Handling Facility classifying the 340 Facility as a Hazard Category 3 facility. The hazard analysis quantifies the operating safety envelop for this facility and demonstrates that the facility can be operated without a significant threat to onsite or offsite people.

  10. LANDFILL BIOREACTOR PERFORMANCE, SECOND INTERIM REPORT

    EPA Science Inventory

    A bioreactor landfill is a landfill that is operated in a manner that is expected to increase the rate and extent of waste decomposition, gas generation, and settlement compared to a traditional landfill. This Second Interim Report was prepared to provide an interpretation of fie...

  11. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades... System and Water Availability Consistent With the Goals and Purpose of the Plan § 385.38 Interim goals... the South Florida Water Management District shall sequence and schedule projects as appropriate...

  12. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades... System and Water Availability Consistent With the Goals and Purpose of the Plan § 385.38 Interim goals... the South Florida Water Management District shall sequence and schedule projects as appropriate...

  13. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades... System and Water Availability Consistent With the Goals and Purpose of the Plan § 385.38 Interim goals... the South Florida Water Management District shall sequence and schedule projects as appropriate...

  14. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades... System and Water Availability Consistent With the Goals and Purpose of the Plan § 385.38 Interim goals... the South Florida Water Management District shall sequence and schedule projects as appropriate...

  15. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades... System and Water Availability Consistent With the Goals and Purpose of the Plan § 385.38 Interim goals... the South Florida Water Management District shall sequence and schedule projects as appropriate...

  16. Automotive Mechanics Occupational Performance Survey. Interim Report.

    ERIC Educational Resources Information Center

    Borcher, Sidney D.; Leiter, Paul B.

    The purpose of this federally-funded interim report is to present the results of a task inventory analysis survey of automotive mechanics completed by project staff within the Instructional Systems Design Program at the Center for Vocational and Technical Education. Intended for use in curriculum development for vocational education programs in…

  17. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... SUBMITTING REPORTS ON WEATHER MODIFICATION ACTIVITIES § 908.5 Interim reports. (a) Any person engaged in a weather modification project or activity in the United States on January 1 in any year shall submit to the... actual modification activities took place; (2) Number of days on which weather modification...

  18. Disposal facility data for the interim performance

    SciTech Connect

    Eiholzer, C.R.

    1995-05-15

    The purpose of this report is to identify and provide information on the waste package and disposal facility concepts to be used for the low-level waste tank interim performance assessment. Current concepts for the low-level waste form, canister, and the disposal facility will be used for the interim performance assessment. The concept for the waste form consists of vitrified glass cullet in a sulfur polymer cement matrix material. The waste form will be contained in a 2 {times} 2 {times} 8 meter carbon steel container. Two disposal facility concepts will be used for the interim performance assessment. These facility concepts are based on a preliminary disposal facility concept developed for estimating costs for a disposal options configuration study. These disposal concepts are based on vault type structures. None of the concepts given in this report have been approved by a Tank Waste Remediation Systems (TWRS) decision board. These concepts will only be used in th interim performance assessment. Future performance assessments will be based on approved designs.

  19. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING RECORDS AND SUBMITTING REPORTS ON WEATHER...

  20. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 3 2014-01-01 2014-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC-ORDS AND SUBMITTING REPORTS ON WEATHER...

  1. 15 CFR 908.5 - Interim reports.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 3 2012-01-01 2012-01-01 false Interim reports. 908.5 Section 908.5 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE GENERAL REGULATIONS MAINTAINING REC- ORDS AND SUBMITTING REPORTS ON WEATHER...

  2. ECALS: loading studies interim report October 2013

    USGS Publications Warehouse

    Klymus, Katy; Richter, Cathy; Chapman, Duane; Paukert, Craig P.

    2013-01-01

    Here we follow up the loading studies interim report from July 2013 and include results from laboratory studies assessing the effects of diet on eDNA shedding rates by bigheaded carps(silver and bighead carp). In order to understand how eDNA behavesin the environment, we must understand how it enters the system. In our July interim report, we addressed three of our four hypotheses that could influence the shedding rate of eDNA by these fish (Table 1; hypotheses A, B and D). We now provide results from studies that tested the fourth hypothesis (C), cellular debris from the gut-lining shed via excrementis a major source of shed eDNA.

  3. Compilation of interim technical research memoranda. Volume I

    SciTech Connect

    Shanahan, W.R.

    1984-04-01

    Four interim technical research memoranda are presented that describe the results of numerical simulations designed to investigate the dynamics of energetic plasma beams propagating across magnetic fields.

  4. The Homestake Interim Laboratory and Homestake DUSEL

    NASA Astrophysics Data System (ADS)

    Lesko, Kevin T.

    2011-12-01

    The former Homestake gold mine in Lead South Dakota is proposed for the National Science Foundation's Deep Underground Science and Engineering Laboratory (DUSEL). The gold mine provides expedient access to depths in excess of 8000 feet below the surface (>7000 mwe). Homestake's long history of promoting scientific endeavours includes the Davis Solar Neutrino Experiment, a chlorine-based experiment that was hosted at the 4850 Level for more than 30 years. As DUSEL, Homestake would be uncompromised by competition with mining interests or other shared uses. The facility's 600-km of drifts would be available for conversion for scientific and educational uses. The State of South Dakota, under Governor Rounds' leadership, has demonstrated exceptionally strong support for Homestake and the creation of DUSEL. The State has provided funding totalling $46M for the preservation of the site for DUSEL and for the conversion and operation of the Homestake Interim Laboratory. Motivated by the strong educational and outreach potential of Homestake, the State contracted a Conversion Plan by world-recognized mine-engineering contractor to define the process of rehabilitating the facility, establishing the appropriate safety program, and regaining access to the facility. The State of South Dakota has established the South Dakota Science and Technology Authority to oversee the transfer of the Homestake property to the State and the rehabilitation and preservation of the facility. The Homestake Scientific Collaboration and the State of South Dakota's Science and Technology Authority has called for Letters of Interest from scientific, educational and engineering collaborations and institutions that are interested in hosting experiments and uses in the Homestake Interim Facility in advance of the NSF's DUSEL, to define experiments starting as early as 2007. The Homestake Program Advisory Committee has reviewed these Letters and their initial report has been released. Options for

  5. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...-01 Interim financial statements. (a) Condensed statements. Interim financial statements shall follow... of this Regulation with the exception of inventories. Data as to raw materials, work in process and... adequacy of additional disclosure needed for a fair presentation, except in regard to...

  6. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... CONSERVATION ACT OF 1975 Interim Financial Statements § 210.10-01 Interim financial statements. (a) Condensed... as to raw materials, work in process and finished goods inventories shall be included either on the... presentation, except in regard to material contingencies, may be determined in that context....

  7. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  8. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  9. 10 CFR 205.288 - Interim and ancillary orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Interim and ancillary orders. 205.288 Section 205.288 Energy DEPARTMENT OF ENERGY OIL ADMINISTRATIVE PROCEDURES AND SANCTIONS Special Procedures for Distribution of Refunds § 205.288 Interim and ancillary orders. The Director of the Office of Hearings...

  10. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  11. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  12. Statistical Profile of Children and Mothers in Afghanistan. Interim Edition.

    ERIC Educational Resources Information Center

    United Nations Children's Fund, Kabul (Afghanistan).

    This interim report is an updating of the 1977 Statistical Profile of Children and Mothers in Afghanistan. The interim report reflects the significant changes in policies brought about by the Saur Revolution establishing the Democratic Republic of Afghanistan in 1978. A comprehensive revision of the report is expected when the new government's…

  13. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder....

  14. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a)...

  15. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a)...

  16. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Interim disaster procedures. 280.1 Section 280.1... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280.1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  17. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Interim disaster procedures. 280.1 Section 280.1... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280.1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  18. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Interim disaster procedures. 280.1 Section 280.1... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280.1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  19. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Interim disaster procedures. 280.1 Section 280.1... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280.1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  20. 7 CFR 280.1 - Interim disaster procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Interim disaster procedures. 280.1 Section 280.1... AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM EMERGENCY FOOD ASSISTANCE FOR VICTIMS OF DISASTERS § 280.1 Interim disaster procedures. The Secretary shall, after consultation with the official...

  1. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  2. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  3. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 50 Wildlife and Fisheries 13 2014-10-01 2014-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  4. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 9 2010-10-01 2010-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  5. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660.720 Section 660.720 Wildlife and Fisheries FISHERY CONSERVATION AND MANAGEMENT, NATIONAL OCEANIC AND... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§...

  6. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based...

  7. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based...

  8. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based...

  9. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based...

  10. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  11. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  12. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  13. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency...

  14. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES (CONTINUED) INTERCONNECTION Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the...

  15. The Predictive and Instructional Value of Interim Assessments

    ERIC Educational Resources Information Center

    Pon, Kathleen

    2013-01-01

    This mixed design study investigated the predictive and instructional uses of two different types of interim mathematics assessments given in two different districts. One district administered the same summative type of assessment three times a year, while the other district administered a different interim assessment after six-week intervals of…

  16. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After...

  17. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After...

  18. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power...

  19. Interim Calibration Report for the SMMR Simulator

    NASA Technical Reports Server (NTRS)

    Gloersen, P.; Cavalieri, D.

    1979-01-01

    The calibration data obtained during the fall 1978 Nimbus-G underflight mission with the scanning multichannel microwave radiometer (SMMR) simulator on board the NASA CV-990 aircraft were analyzed and an interim calibration algorithm was developed. Data selected for the analysis consisted of in flight sky, first-year sea ice, and open water observations, as well as ground based observations of fixed targets with varied temperatures of selected instrument components. For most of the SMMR channels, a good fit to the selected data set was obtained with the algorithm.

  20. Retention of long-term interim restorations with sodium fluoride enriched interim cement

    NASA Astrophysics Data System (ADS)

    Strash, Carolyn

    Purpose: Interim fixed dental prostheses, or "provisional restorations", are fabricated to restore teeth when definitive prostheses are made indirectly. Patients undergoing extensive prosthodontic treatment frequently require provisionalization for several months or years. The ideal interim cement would retain the restoration for as long as needed and still allow for ease of removal. It would also avoid recurrent caries by preventing demineralization of tooth structure. This study aims to determine if adding sodium fluoride varnish to interim cement may assist in the retention of interim restorations. Materials and methods: stainless steel dies representing a crown preparation were fabricated. Provisional crowns were milled for the dies using CAD/CAM technology. Crowns were provisionally cemented onto the dies using TempBond NE and NexTemp provisional cements as well as a mixture of TempBond NE and Duraphat fluoride varnish. Samples were stored for 24h then tested or thermocycled for 2500 or 5000 cycles before being tested. Retentive strength of each cement was recorded using a universal testing machine. Results: TempBond NE and NexTemp cements performed similarly when tested after 24h. The addition of Duraphat significantly decreased the retention when added to TempBond NE. NexTemp cement had high variability in retention over all tested time periods. Thermocycling for 2500 and 5000 cycles significantly decreased the retention of all cements. Conclusions: The addition of Duraphat fluoride varnish significantly decreased the retention of TempBond NE and is therefore not recommended for clinical use. Thermocycling significantly reduced the retention of TempBond NE and NexTemp. This may suggest that use of these cements for three months, as simulated in this study, is not recommended.

  1. PROJECT W-551 INTERIM PRETREATMENT SYSTEM PRECONCEPTUAL CANDIDATE TECHNOLOGY DESCRIPTIONS

    SciTech Connect

    MAY TH

    2008-08-12

    The Office of River Protection (ORP) has authorized a study to recommend and select options for interim pretreatment of tank waste and support Waste Treatment Plant (WTP) low activity waste (LAW) operations prior to startup of all the WTP facilities. The Interim Pretreatment System (IPS) is to be a moderately sized system which separates entrained solids and 137Cs from tank waste for an interim time period while WTP high level waste vitrification and pretreatment facilities are completed. This study's objective is to prepare pre-conceptual technology descriptions that expand the technical detail for selected solid and cesium separation technologies. This revision includes information on additional feed tanks.

  2. Natural tooth as an interim prosthesis

    PubMed Central

    Dhariwal, Neha S.; Gokhale, Niraj S.; Patel, Punit; Hugar, Shivayogi M.

    2016-01-01

    A traumatic injury to primary maxillary anterior tooth is one of the common causes for problems with the succedaneous tooth leading to it noneruption. A missing anterior tooth can be psychologically and socially damaging to the patient. Despite a wide range of treatment options available, sometimes, it is inevitable to save the natural tooth. This paper describes the immediate replacement of a right central incisor using a fiber-composite resin splint with the natural tooth crown as a pontic following surgical extraction of the dilacerated impacted permanent maxillary central incisor. The abutment teeth can be conserved with minimal or no preparation, thus keeping the technique reversible and can be completed at chair side thereby avoiding laboratory costs. It can be used as an interim measure until a definitive prosthesis can be fabricated as the growth is still incomplete. PMID:27433074

  3. AGR-1 Data Qualification Interim Report

    SciTech Connect

    Machael Abbott

    2009-08-01

    Projects for the very-high-temperature reactor (VHTR) program provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR Program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are (1) qualified for use, (2) stored in a readily accessible electronic form, and (3) analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the data streams associated with the first Advanced Gas Reactor (AGR-1) experiment, the processing of these data within NDMAS, and reports the interim FY09 qualification status of the AGR-1 data to date. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category, which is assigned by the data generator, and include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing, to confirm that the data are an accurate representation of the system or object being measured, and (3) documentation that the data were collected under an NQA-1 or equivalent QA program. The interim qualification status of the following four data streams is reported in this document: (1) fuel fabrication data, (2) fuel irradiation data, (3) fission product monitoring system (FPMS) data, and (4) Advanced Test Reactor (ATR) operating conditions data. A final report giving the NDMAS qualification status of all AGR-1 data (including cycle 145A) is planned for February 2010.

  4. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  5. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  6. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  7. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  8. 46 CFR 308.303 - Amounts insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... INSURANCE Second Seamen's War Risk Insurance § 308.303 Amounts insured under interim binder. The amounts insured are the amounts specified in the Second Seamen's War Risk Policy (1955) or as modified by...

  9. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... required data, conducting the new risk assessment and completing the registration review. A FIFRA 3(c)(2)(B... registration review decision may require new risk mitigation measures, impose interim risk mitigation...

  10. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...) Additional line items may be presented to facilitate the usefulness of the interim financial statements... cumulative financial information from inception. Instruction 1 to § 210.8-03: Where Article 8 is...

  11. Fuel Supply Shutdown Facility Interim Operational Safety Requirements

    SciTech Connect

    BENECKE, M.W.

    2000-09-06

    The Interim Operational Safety Requirements for the Fuel Supply Shutdown (FSS) Facility define acceptable conditions, safe boundaries, bases thereof, and management of administrative controls to ensure safe operation of the facility.

  12. TANK FARM INTERIM SURFACE BARRIER MATERIALS AND RUNOFF ALTERNATIVES STUDY

    SciTech Connect

    HOLM MJ

    2009-06-25

    This report identifies candidate materials and concepts for interim surface barriers in the single-shell tank farms. An analysis of these materials for application to the TY tank farm is also provided.

  13. Fire Hazards Analysis for the 200 Area Interim Storage Area

    SciTech Connect

    JOHNSON, D.M.

    2000-01-06

    This documents the Fire Hazards Analysis (FHA) for the 200 Area Interim Storage Area. The Interim Storage Cask, Rad-Vault, and NAC-1 Cask are analyzed for fire hazards and the 200 Area Interim Storage Area is assessed according to HNF-PRO-350 and the objectives of DOE Order 5480 7A. This FHA addresses the potential fire hazards associated with the Interim Storage Area (ISA) facility in accordance with the requirements of DOE Order 5480 7A. It is intended to assess the risk from fire to ensure there are no undue fire hazards to site personnel and the public and to ensure property damage potential from fire is within acceptable limits. This FHA will be in the form of a graded approach commensurate with the complexity of the structure or area and the associated fire hazards.

  14. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... lands; (7) Shall promote safe commercial air tour operations; (8) Shall promote the adoption of quiet technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based...

  15. Interim solar cell testing procedures for terrestrial applications

    NASA Technical Reports Server (NTRS)

    Brandhorst, H. W., Jr.; Hickey, J.; Curtis, H.

    1975-01-01

    This report presents an interim draft of procedures for testing solar cells for terrestrial applications that resulted from the terrestrial photovoltaic workshop sessions. A final version of the test procedures manual is planned for the summer of 1976.

  16. NCI Director Also to Be Interim FDA Commissioner

    Cancer.gov

    Andrew von Eschenbach, M.D., director of the NCI, was asked by President Bush on Friday, September 23, 2005, to assume the additional role of interim Commissioner of the U.S. Food and Drug Administration (FDA).

  17. TWRS HLW interim storage facility search and evaluation

    SciTech Connect

    Calmus, R.B., Westinghouse Hanford

    1996-05-16

    The purpose of this study was to identify and provide an evaluation of interim storage facilities and potential facility locations for the vitrified high-level waste (HLW) from the Phase I demonstration plant and Phase II production plant. In addition, interim storage facilities for solidified separated radionuclides (Cesium and Technetium) generated during pretreatment of Phase I Low-Level Waste Vitrification Plant feed was evaluated.

  18. K basins interim remedial action health and safety plan

    SciTech Connect

    DAY, P.T.

    1999-09-14

    The K Basins Interim Remedial Action Health and Safety Plan addresses the requirements of the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), as they apply to the CERCLA work that will take place at the K East and K West Basins. The provisions of this plan become effective on the date the US Environmental Protection Agency issues the Record of Decision for the K Basins Interim Remedial Action, currently planned in late August 1999.

  19. Interim Safety Basis for Fuel Supply Shutdown Facility

    SciTech Connect

    BENECKE, M.W.

    2000-09-07

    This ISB, in conjunction with the IOSR, provides the required basis for interim operation or restrictions on interim operations and administrative controls for the facility until a SAR is prepared in accordance with the new requirements or the facility is shut down. It is concluded that the risks associated with tha current and anticipated mode of the facility, uranium disposition, clean up, and transition activities required for permanent closure, are within risk guidelines.

  20. The halogen bond: an interim perspective.

    PubMed

    Legon, Anthony C

    2010-07-28

    There has been an upsurge of interest in the halogen bond during the last decade. This non-covalent interaction is less familiar than the hydrogen bond, but is similar to it in several respects. In this article, we first discuss the nature of the halogen bond in the gas phase, as established by systematic investigations of the rotational spectra of complexes B...XY, where B is a simple Lewis base and XY is a dihalogen molecule. The geometry of a given B...XY is found to be isomorphic with that of the corresponding hydrogen-bonded system B...HX, an observation that leads an interim definition of the halogen bond similar to that recently proposed for the hydrogen bond. Selected novel applications of the halogen bond made in the last decade in various areas of chemistry/materials (namely crystal engineering, liquid crystals, nano-materials, polymer chemistry and inorganic chemistry) are then reviewed. These applications generally involve molecules of the type XR (where R is an electron-withdrawing group) acting as the electron donor, rather than dihalogens XY.

  1. An interim overview of LDEF materials findings

    NASA Technical Reports Server (NTRS)

    Stein, Brad A.

    1992-01-01

    The flight and retrieval of the National Aeronautics and Space Administration's Long Duration Exposure Facility (LDEF) provided an opportunity for the study of the low-Earth orbit (LEO) environment and long-duration space environmental effects (SEE) on materials that is unparalleled in the history of the U.S. Space Program. The remarkable flight attitude stability of LDEF enables specific analyses of various individual and combined effects of LEO environmental parameters on identical materials on the same space vehicle. This paper provides an overview of the interim LDEF materials findings of the Principal Investigators and the Materials Special Investigation Group. In general, the LDEF data is remarkably consistent; LDEF will provide a 'benchmark' for materials design data bases for satellites in low-Earth orbit. Some materials were identified to be encouragingly resistant to LEO SEE for 5.8 years; other 'space qualified' materials displayed significant environmental degradation. Molecular contamination was widespread; LDEF offers an unprecedented opportunity to provide a unified perspective of unmanned LEO spacecraft contamination mechanisms. New material development requirements for long-term LEO missions have been identified and current ground simulation testing methods/data for new, durable materials concepts can be validated with LDEF results. LDEF findings are already being integrated into the design of Space Station Freedom.

  2. Permitting plan for the high-level waste interim storage

    SciTech Connect

    Deffenbaugh, M.L.

    1997-04-23

    This document addresses the environmental permitting requirements for the transportation and interim storage of solidified high-level waste (HLW) produced during Phase 1 of the Hanford Site privatization effort. Solidified HLW consists of canisters containing vitrified HLW (glass) and containers that hold cesium separated during low-level waste pretreatment. The glass canisters and cesium containers will be transported to the Canister Storage Building (CSB) in a U.S. Department of Energy (DOE)-provided transportation cask via diesel-powered tractor trailer. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage of Tank Waste Remediation Systems (TWRS) immobilized HLW (IHLW) and other canistered high-level waste forms; and (2) interim storage and disposal of TWRS immobilized low-activity tank waste (ILAW). An environmental requirements checklist and narrative was developed to identify the permitting path forward for the HLW interim storage (HLWIS) project (See Appendix B). This permitting plan will follow the permitting logic developed in that checklist.

  3. NEXT GENERATION MELTER OPTIONEERING STUDY - INTERIM REPORT

    SciTech Connect

    GRAY MF; CALMUS RB; RAMSEY G; LOMAX J; ALLEN H

    2010-10-19

    The next generation melter (NOM) development program includes a down selection process to aid in determining the recommended vitrification technology to implement into the WTP at the first melter change-out which is scheduled for 2025. This optioneering study presents a structured value engineering process to establish and assess evaluation criteria that will be incorporated into the down selection process. This process establishes an evaluation framework that will be used progressively throughout the NGM program, and as such this interim report will be updated on a regular basis. The workshop objectives were achieved. In particular: (1) Consensus was reached with stakeholders and technology providers represented at the workshop regarding the need for a decision making process and the application of the D{sub 2}0 process to NGM option evaluation. (2) A framework was established for applying the decision making process to technology development and evaluation between 2010 and 2013. (3) The criteria for the initial evaluation in 2011 were refined and agreed with stakeholders and technology providers. (4) The technology providers have the guidance required to produce data/information to support the next phase of the evaluation process. In some cases it may be necessary to reflect the data/information requirements and overall approach to the evaluation of technology options against specific criteria within updated Statements of Work for 2010-2011. Access to the WTP engineering data has been identified as being very important for option development and evaluation due to the interface issues for the NGM and surrounding plant. WRPS efforts are ongoing to establish precisely data that is required and how to resolve this Issue. It is intended to apply a similarly structured decision making process to the development and evaluation of LAW NGM options.

  4. High Temperature Materials Interim Data Qualification Report

    SciTech Connect

    Nancy Lybeck

    2010-08-01

    ABSTRACT Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the NGNP Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim FY2010 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under NQA-1 guidelines, and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing, to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from two test series within the High Temperature Materials data stream have been entered into the NDMAS vault: 1. Tensile Tests for Sm (i.e., Allowable Stress) Confirmatory Testing – 1,403,994 records have been inserted into the NDMAS database. Capture testing is in process. 2. Creep-Fatigue Testing to Support Determination of Creep-Fatigue Interaction Diagram – 918,854 records have been processed and inserted into the NDMAS database. Capture testing is in process.

  5. A review of proposed Glen Canyon Dam interim operating criteria

    SciTech Connect

    LaGory, K.; Hlohowskyj, I.; Tomasko, D.; Hayse, J.; Durham, L.

    1992-04-01

    Three sets of interim operating criteria for Glen Canyon Dam on the Colorado River have been proposed for the period of November 1991, to the completion of the record of decision for the Glen Canyon Dam environmental impact statement (about 1993). These criteria set specific limits on dam releases, including maximum and minimum flows, up-ramp and down-ramp rates, and maximum daily fluctuation. Under the proposed interim criteria, all of these parameters would be reduced relative to historical operating criteria to protect downstream natural resources, including sediment deposits, threatened and endangered fishes, trout, the aquatic food base, and riparian plant communities. The scientific bases of the three sets of proposed operating criteria are evaluated in the present report:(1) criteria proposed by the Research/Scientific Group, associated with the Glen Canyon Environmental Studies (GCES); (2) criteria proposed state and federal officials charged with managing downstream resources; and (3) test criteria imposed from July 1991, to November 1991. Data from Phase 1 of the GCES and other sources established that the targeted natural resources are affected by dam operations, but the specific interim criteria chosen were not supported by any existing studies. It is unlikely that irreversible changes to any of the resources would occur over the interim period if historical operating criteria remained in place. It is likely that adoption of any of the sets of proposed interim operating criteria would reduce the levels of sediment transport and erosion below Glen Canyon Dam; however, these interim criteria could result in some adverse effects, including the accumulation of debris at tributary mouths, a shift of new high-water-zone vegetation into more flood-prone areas, and further declines in vegetation in the old high water zone.

  6. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-03-27

    Solid and liquid radioactive waste continues to be stored in 149 single-shell tanks at the Hanford Site. To date, 119 tanks have had most of the pumpable liquid removed by interim stabilization. Thirty tanks remain to be stabilized. One of these tanks (C-106) will be stabilized by retrieval of the tank contents. The remaining 29 tanks will be interim stabilized by saltwell pumping. In the summer of 1997, the US Department of Energy (DOE) placed a moratorium on the startup of additional saltwell pumping systems because of funding constraints and proposed modifications to the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) milestones to the Washington State Department of Ecology (Ecology). In a letter dated February 10, 1998, Final Determination Pursuant to Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) in the Matter of the Disapproval of the DOE`s Change Control Form M-41-97-01 (Fitzsimmons 1998), Ecology disapproved the DOE Change Control Form M-41-97-01. In response, Fluor Daniel Hanford, Inc. (FDH) directed Lockheed Martin Hanford Corporation (LNMC) to initiate development of a project plan in a letter dated February 25, 1998, Direction for Development of an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan in Support of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). In a letter dated March 2, 1998, Request for an Aggressive Single-Shell Tank (SST) Interim Stabilization Completion Project Plan, the DOE reaffirmed the need for an aggressive SST interim stabilization completion project plan to support a finalized Tri-Party Agreement Milestone M-41 recovery plan. This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities

  7. 75 FR 35510 - License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... COMMISSION License Renewal Interim Staff Guidance Process, Revision 2 Notice of Availability AGENCY: Nuclear... license renewal interim staff guidance (LR-ISG) process. This revision is entitled, ``License Renewal Interim Staff Guidance Process, Revision 2'' (revised LR-ISG process). The LR-ISG process describes...

  8. 75 FR 63080 - Interim Final Rule for Reporting Pre-Enactment Swap Transactions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... COMMISSION 17 CFR Part 44 RIN 3038-AD24 Interim Final Rule for Reporting Pre-Enactment Swap Transactions AGENCY: Commodity Futures Trading Commission. ACTION: Interim final rule; request for public comment... an interim final rule to implement new statutory provisions introduced by Title VII of the...

  9. 78 FR 67442 - Congestion Mitigation and Air Quality Improvement Program Interim Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... types of rail service in a January 16, 2002, Federal Register notice (67 FR 2278), and in a March 8... Federal Highway Administration Congestion Mitigation and Air Quality Improvement Program Interim Guidance... Mitigation and Air Quality Improvement (CMAQ) Program (Interim Guidance). The Interim Guidance revises...

  10. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver must reference the Petition... Renewable Energy. (e) Provisions specific to interim waivers—(1) Disposition of application. If... 10 Energy 3 2010-01-01 2010-01-01 false Petitions for waiver, and applications for interim...

  11. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Conservation and Renewable Energy. (2) An Application for Interim Waiver shall be submitted in triplicate, with... Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver shall reference the... Renewable Energy will receive and consider timely written comments on the Application for Interim...

  12. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... interim per capita rate of payment on the basis of the best available data and adjust payments on the basis of that rate until the required reports are submitted and a new interim per capita rate can be established; or (2) If there is not enough data on which to base an interim per capita rate, inform the HMO...

  13. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... interim per capita rate of payment on the basis of the best available data and adjust payments on the basis of that rate until the required reports are submitted and a new interim per capita rate can be established; or (2) If there is not enough data on which to base an interim per capita rate, inform the HMO...

  14. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... interim per capita rate of payment on the basis of the best available data and adjust payments on the basis of that rate until the required reports are submitted and a new interim per capita rate can be established; or (2) If there is not enough data on which to base an interim per capita rate, inform the HMO...

  15. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interim per capita rate of payment on the basis of the best available data and adjust payments on the basis of that rate until the required reports are submitted and a new interim per capita rate can be established; or (2) If there is not enough data on which to base an interim per capita rate, inform the HMO...

  16. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... interim per capita rate of payment on the basis of the best available data and adjust payments on the basis of that rate until the required reports are submitted and a new interim per capita rate can be established; or (2) If there is not enough data on which to base an interim per capita rate, inform the HMO...

  17. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... date of such balance sheet and the comparable period of the preceding fiscal year. (a) Condensed format. Interim financial statements may be condensed as follows: (1) Balance sheets should include separate... not misleading. (2) Material subsequent events and contingencies. Disclosure must be provided...

  18. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... date of such balance sheet and the comparable period of the preceding fiscal year. (a) Condensed format. Interim financial statements may be condensed as follows: (1) Balance sheets should include separate... not misleading. (2) Material subsequent events and contingencies. Disclosure must be provided...

  19. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... date of such balance sheet and the comparable period of the preceding fiscal year. (a) Condensed format. Interim financial statements may be condensed as follows: (1) Balance sheets should include separate... not misleading. (2) Material subsequent events and contingencies. Disclosure must be provided...

  20. Building an Interim Assessment System: A Workbook for School Districts

    ERIC Educational Resources Information Center

    Crane, Eric W.

    2010-01-01

    As someone with a stake in a school district's systems, a person probably does not have all the answers around what is necessary to build an effective interim assessment system. Neither does this workbook. But it is intended to have the right questions. More precisely, this workbook contains the vision, infrastructure, and resource questions…

  1. Evaluation of hardness and wear resistance of interim restorative materials

    PubMed Central

    Savabi, Omid; Nejatidanesh, Farahnaz; Fathi, Mohamad Hossein; Navabi, Amir Arsalan; Savabi, Ghazal

    2013-01-01

    Background: The interim restorative materials should have certain mechanical properties to withstand in oral cavity. The aim of this study was to evaluate the hardness and wear resistance of interim restorative materials. Materials and Methods: Fifteen identical rectangular shape specimens with dimensions of 2 mm × 10 mm × 30 mm were made from 7 interim materials (TempSpan, Protemp 3 Garant, Revotek, Unifast LC, Tempron, Duralay, and Acropars). The Vickers hardness and abrasive wear of specimens were tested in dry conditions and after 1 week storage in artificial saliva. The depth of wear was measured using surface roughness inspection device. Data were subjected to Kruskal–Wallis and Mann–Whitney tests. The Pearson correlation coefficient was used to determine the relationship between hardness and wear (α =0.05). Results: TempSpan had the highest hardness. The wear resistance of TempSpan (in dry condition) and Revotek (after conditioning in artificial saliva) was significantly higher (P < 0.05). There was no statistically significant correlation between degree of wear and hardness of the materials (P = 0.281, r = −0.31). Conclusion: Hardness and wear resistance of interim resins are material related rather than category specified. PMID:23946734

  2. 78 FR 70244 - Electronic Interim Assistance Reimbursement Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-25

    ...: November 15, 2013. Carolyn W. Colvin, Acting Commissioner of Social Security. For the reasons set out in... From the Federal Register Online via the Government Publishing Office SOCIAL SECURITY ADMINISTRATION 20 CFR Part 416 RIN 0960-AH45 Electronic Interim Assistance Reimbursement Program AGENCY:...

  3. 49 CFR 106.35 - Interim final rule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 2 2010-10-01 2010-10-01 false Interim final rule. 106.35 Section 106.35 Transportation Other Regulations Relating to Transportation PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION HAZARDOUS MATERIALS AND OIL TRANSPORTATION RULEMAKING...

  4. Comprehensive Illinois Occupational Education Demonstration Center. Second Interim Report.

    ERIC Educational Resources Information Center

    Illinois State Board of Vocational Education and Rehabilitation, Springfield. Div. of Vocational and Technical Education.

    The second interim report covers the time period from July 1, 1974 to June 30, 1975, phase two of the project. The document consists of four separate reports: a report summary, reports of the two demonstration centers, and a third party evaluation by Educational Management Services, Inc. The 13-page summary describes the overall project. A 39-page…

  5. 48 CFR 801.690-8 - Interim appointment provisions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Interim appointment provisions. 801.690-8 Section 801.690-8 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS GENERAL DEPARTMENT OF VETERANS AFFAIRS ACQUISITION REGULATION SYSTEM Career Development,...

  6. 48 CFR 301.603-3 - Interim appointments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Interim appointments. 301.603-3 Section 301.603-3 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES GENERAL HHS ACQUISITION REGULATION SYSTEM Career Development, Contracting Authority, and Responsibilities...

  7. Study of the Voluntary Public School Choice Program. Interim Report

    ERIC Educational Resources Information Center

    Yin, Robert K.; Ahonen, Pirkko; Kim, Dawn

    2007-01-01

    The purpose of the Voluntary Public School Choice (VPSC) Program is to assist states and local school districts in the development of innovative strategies to expand options for students, and to encourage transfers of students from low-performing to higher-performing schools. This report presents interim findings from the National Evaluation of…

  8. President's Information Technology Advisory Committee Interim Report to the President.

    ERIC Educational Resources Information Center

    National Coordination Office for Information Technology Research and Development, Arlington, VA.

    This document is the Interim Report on future directions for Federal support of research and development in high performance computing, communications, information technology, and the Next Generation Internet. This report provides a more detailed explanation of the findings and recommendations summarized by the President's Information Technology…

  9. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the facility subject to the requirement to have a RCRA permit shall have interim status and shall be... section 3010(a) of RCRA pertaining to notification of hazardous waste activity. (2) Complied with the...) Paragraph (a) of this section shall not apply to any facility which has been previously denied a RCRA...

  10. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the facility subject to the requirement to have a RCRA permit shall have interim status and shall be... section 3010(a) of RCRA pertaining to notification of hazardous waste activity. (2) Complied with the...) Paragraph (a) of this section shall not apply to any facility which has been previously denied a RCRA...

  11. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the facility subject to the requirement to have a RCRA permit shall have interim status and shall be... section 3010(a) of RCRA pertaining to notification of hazardous waste activity. (2) Complied with the...) Paragraph (a) of this section shall not apply to any facility which has been previously denied a RCRA...

  12. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the facility subject to the requirement to have a RCRA permit shall have interim status and shall be... section 3010(a) of RCRA pertaining to notification of hazardous waste activity. (2) Complied with the...) Paragraph (a) of this section shall not apply to any facility which has been previously denied a RCRA...

  13. 40 CFR 270.70 - Qualifying for interim status.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the facility subject to the requirement to have a RCRA permit shall have interim status and shall be... section 3010(a) of RCRA pertaining to notification of hazardous waste activity. (2) Complied with the...) Paragraph (a) of this section shall not apply to any facility which has been previously denied a RCRA...

  14. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RCRA permit and which is granted interim status, twelve months after the date on which the facility...) Submits a part B application for a RCRA permit for such facility before the date 12 months after the date... 8, 1989, unless the owner or operator of the facility submits a part B application for a RCRA...

  15. Pupil Inquiry Behavior Analysis and Change Activity. Interim Project Report.

    ERIC Educational Resources Information Center

    Manion, Raymond C.

    This interim report discusses progress toward three major goals of the Pupil Inquiry Behavior Analysis and Change Activity: increased pupil inquiry, changed teacher behavior to facilitate pupil inquiry, and the development of a 32-week course of instruction to provide for these behavioral changes. Data currently available deals with the emotional…

  16. Performance Criteria for the Luminous Environment. Interim Report.

    ERIC Educational Resources Information Center

    State Univ. Construction Fund, Albany, NY.

    This interim report informs the eventual user of the direction of the long-term program; specific criteria are not provided. Five current guidelines in lighting practice were disavowed as follows--(1) that low levels of illumination cause organic harm to the eyes, (2) that the footcandle is the best criterion for determining the proper…

  17. 40 CFR 270.73 - Termination of interim status.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements. (e) For owners or operators of any land disposal unit that is granted authority to operate under... of each land disposal facility which has been granted interim status prior to November 8, 1984, on... or operators of each land disposal facility which is in existence on the effective date of...

  18. 20 CFR 416.1910 - Requirements for interim assistance agreement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... effect between us and the State if we are to repay the State for interim assistance. The following... part on payment of benefits if the State cannot pay it to you (for example, you die or you move and the... State must agree to the length of time that the agreement will remain in effect. (e) State to...

  19. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. Link to an... disability wishes to travel is already provided by an accessible bus, the operator has met this requirement... accessible buses (e.g., a small fixed-route operator who exclusively or primarily purchases or leases...

  20. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until... accessible bus, the operator has met this requirement. (2) Before a date one year from the date on which this... fleet 100 percent of which consists of accessible buses (e.g., a small fixed-route operator...

  1. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged...

  2. 45 CFR 689.8 - Interim administrative actions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ....8 Public Welfare Regulations Relating to Public Welfare (Continued) NATIONAL SCIENCE FOUNDATION RESEARCH MISCONDUCT § 689.8 Interim administrative actions. (a) After an inquiry or during an external or... taken to protect Federal resources or to guard against continuation of any suspected or alleged...

  3. California School-to-Career Evaluation Study Interim Report.

    ERIC Educational Resources Information Center

    MPR Associates, Berkeley, CA.

    California's school-to-career (STC) efforts were examined in a statewide evaluation study that was initiated in December 2000 and scheduled for completion by June 2002. The study's first phase was assessed in an interim report that focused on the following major activities: (1) development of a white paper describing the STC's national and state…

  4. 16 CFR 1203.53 - Interim safety standards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies of the standards may be... SAFETY STANDARD FOR BICYCLE HELMETS Requirements For Bicycle Helmets Manufactured From March 17, 1995, Through March 10, 1999 § 1203.53 Interim safety standards. (a) Bicycle helmets must comply with one...

  5. The Bigger Picture: Institutional Perspectives on Interim Assessment Technologies

    ERIC Educational Resources Information Center

    Burch, Patricia

    2010-01-01

    Drawing on a study of new forms of educational privatization, this article examines how ideas from institutional theory can be useful in analyzing the complex dynamics behind interim assessment technologies. The study was based on qualitative research methods and included interviews, a small-scale questionnaire, participant observation, and…

  6. Interim Evaluation of the National Literacy Program. Final Report

    ERIC Educational Resources Information Center

    Human Resources and Social Development Canada, 2007

    2007-01-01

    The evaluation examined issues related to: (1) Rationale and Relevance; (2) Implementation; and (3) Success. In addition, the interim evaluation was intended to: (1) Determine whether sufficient data was being collected to inform the summative evaluation and identify opportunities for improvement to fill any potential gaps; (2) Assess whether the…

  7. Department of Defnese. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This is the ninth in a series of interim reports to the Congress concerning the impact of the increasing worldwide use of the metric system and to determine the advantages and disadvantages of its adoption in the United States. This report contains the Department of Defense estimates of its costs in a coordinated national changeover to the metric…

  8. Marine Biochemistry: A New Interdisciplinary Course for the Interim

    ERIC Educational Resources Information Center

    Goldberg, Arthur S.

    1976-01-01

    Discusses an undergraduate course which includes lectures, laboratory, and field trips and is designed for the interim winter semester. The course is interdisciplinary, involving a study of the biochemistry, pharmacology, and physiological significance of compounds from marine flora and fauna. (MLH)

  9. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Interim Financial Statements § 210.10... financial statements, such as a statement of significant accounting policies and practices, details of... dividends declared per share applicable to common stock. The basis of the earnings per share...

  10. Effectiveness Monitoring Report, MWMF Tritium Phytoremediation Interim Measures.

    SciTech Connect

    Hitchcock, Dan; Blake, John, I.

    2003-02-10

    This report describes and presents the results of monitoring activities during irrigation operations for the calendar year 2001 of the MWMF Interim Measures Tritium Phytoremediation Project. The purpose of this effectiveness monitoring report is to provide the information on instrument performance, analysis of CY2001 measurements, and critical relationships needed to manage irrigation operations, estimate efficiency and validate the water and tritium balance model.

  11. Penalty Inflation Adjustments for Civil Money Penalties. Interim Final Rule.

    PubMed

    2016-06-27

    In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990, as amended by the Debt Collection Improvement Act of 1996, and further amended by the Bipartisan Budget Act of 2015, section 701: Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, this interim final rule incorporates the penalty inflation adjustments for the civil money penalties contained in the Social Security Act

  12. Ocotillo: Improving Learning through Instruction. Interim Report, 1989-90.

    ERIC Educational Resources Information Center

    Walters, Jim, Ed.; Jacobs, Alan, Ed.

    Continuing work begun at a 1988 conference, the Ocotillo Action/Research Groups of the Maricopa Community Colleges (Arizona) explored ways to enhance the use of educational technology and to capitalize on future developments in the field. These interim reports cover work done in 1989-90 and serve as a basis for the next projected conference. The…

  13. Ocotillo: Improving Learning through Instruction. Interim Report, 1988-89.

    ERIC Educational Resources Information Center

    Jacobs, Alan, Ed.; Walters, Jim, Ed.

    As a result of a Technology Retreat sponsored by the Maricopa Community Colleges (Arizona) in 1988, action/research groups were formed to explore the various challenges of implementing instructional technology effectively. This interim report reviews the work of the groups, with a summary report from each, as follows: (1) "Alternative Funding…

  14. Interim Sanitary Landfill Groundwater Monitoring Report (1998 Annual Report)

    SciTech Connect

    Wells, D.

    1999-03-18

    The SRS Interim Sanitary Landfill opened in Mid-1992 and operated until 1998 under Domestic Waste Permit No. 025500-1120. Several contaminants have been detected in the groundwater beneath the unit.The well sampling and analyses were conducted in accordance with Procedure 3Q5, Hydrogeologic Data Collection.

  15. System Specification for Immobilized High-Level Waste Interim Storage

    SciTech Connect

    CALMUS, R.B.

    2000-12-27

    This specification establishes the system-level functional, performance, design, interface, and test requirements for Phase 1 of the IHLW Interim Storage System, located at the Hanford Site in Washington State. The IHLW canisters will be produced at the Hanford Site by a Selected DOE contractor. Subsequent to storage the canisters will be shipped to a federal geologic repository.

  16. Single-shell tank interim stabilization project plan

    SciTech Connect

    Ross, W.E.

    1998-05-11

    This project plan establishes the management framework for conduct of the TWRS Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organizational structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  17. Single Shell Tank (SST) Interim Stabilization Project Plan

    SciTech Connect

    VLADIMIROFF, D.T.; BOYLES, V.C.

    2000-05-22

    This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.

  18. SLIGHTLY IRRADIATED FUEL (SIF) INTERIM DISPOSITION PROJECT

    SciTech Connect

    NORTON SH

    2010-02-23

    CH2M HILL Plateau Remediation Company (CH2M HILL PRC) is proud to submit the Slightly Irradiated Fuel (SIF) Interim Disposition Project for consideration by the Project Management Institute as Project of the Year for 2010. The SIF Project was a set of six interrelated sub-projects that delivered unique stand-alone outcomes, which, when integrated, provided a comprehensive and compliant system for storing high risk special nuclear materials. The scope of the six sub-projects included the design, construction, testing, and turnover of the facilities and equipment, which would provide safe, secure, and compliant Special Nuclear Material (SNM) storage capabilities for the SIF material. The project encompassed a broad range of activities, including the following: Five buildings/structures removed, relocated, or built; Two buildings renovated; Structural barriers, fencing, and heavy gates installed; New roadways and parking lots built; Multiple detection and assessment systems installed; New and expanded communication systems developed; Multimedia recording devices added; and A new control room to monitor all materials and systems built. Project challenges were numerous and included the following: An aggressive 17-month schedule to support the high-profile Plutonium Finishing Plant (PFP) decommissioning; Company/contractor changeovers that affected each and every project team member; Project requirements that continually evolved during design and construction due to the performance- and outcome-based nature ofthe security objectives; and Restrictions imposed on all communications due to the sensitive nature of the projects In spite of the significant challenges, the project was delivered on schedule and $2 million under budget, which became a special source of pride that bonded the team. For years, the SIF had been stored at the central Hanford PFP. Because of the weapons-grade piutonium produced and stored there, the PFP had some of the tightest security on the Hanford

  19. 50 CFR 259.30 - Application for Interim Capital Construction Fund Agreement (“Interim CCF Agreement”).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Construction Fund Agreement (âInterim CCF Agreementâ). 259.30 Section 259.30 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE AID TO... for hire must be inspected and certified (under 46 CFR part 176) by the U.S. Coast Guard as...

  20. Interim safety basis compliance matrix for Trenches 31 and 34

    SciTech Connect

    Ames, R.R.

    1994-12-30

    The tables provided in this document identify the specific requirements and basis for the administrative controls established in the Westinghouse Hanford Company (WHC) Solid Waste Burial Ground (SWBG) Interim Safety Basis (ISB) for operation of the Project W-025, Mixed Waste Lined Landfill (Trenches 31 and 34). The tables document the necessary controls and implementing procedures to ensure compliance with the requirements of the ISB. These requirements provide a basis for future Unreviewed Safety Questions (USQ) screening of applicable procedure changes, proposed physical modifications, tests, experiments, and occurrences. Table 1 provides the SWBG interim Operational Safety Requirements administrative controls matrix. The specific assumptions and commitments used in the safety analysis documents applicable to disposal of mixed wastes in Trenches 31 and 34 are provided in Table 2. Table 3 is provided to document the potential engineered and administrative mitigating features identified in the Preliminary Hazard Analysis (PHA) for disposal of mixed waste.

  1. Plutonium Finishing Plant. Interim plutonium stabilization engineering study

    SciTech Connect

    Sevigny, G.J.; Gallucci, R.H.; Garrett, S.M.K.; Geeting, J.G.H.; Goheen, R.S.; Molton, P.M.; Templeton, K.J.; Villegas, A.J.; Nass, R.

    1995-08-01

    This report provides the results of an engineering study that evaluated the available technologies for stabilizing the plutonium stored at the Plutonium Finishing Plant located at the hanford Site in southeastern Washington. Further processing of the plutonium may be required to prepare the plutonium for interim (<50 years) storage. Specifically this document provides the current plutonium inventory and characterization, the initial screening process, and the process descriptions and flowsheets of the technologies that passed the initial screening. The conclusions and recommendations also are provided. The information contained in this report will be used to assist in the preparation of the environmental impact statement and to help decision makers determine which is the preferred technology to process the plutonium for interim storage.

  2. Penalty Inflation Adjustments for Civil Money Penalties. Interim Final Rule.

    PubMed

    2016-06-27

    In accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990, as amended by the Debt Collection Improvement Act of 1996, and further amended by the Bipartisan Budget Act of 2015, section 701: Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015, this interim final rule incorporates the penalty inflation adjustments for the civil money penalties contained in the Social Security Act PMID:27373014

  3. Report on interim storage of spent nuclear fuel

    SciTech Connect

    Not Available

    1993-04-01

    The report on interim storage of spent nuclear fuel discusses the technical, regulatory, and economic aspects of spent-fuel storage at nuclear reactors. The report is intended to provide legislators state officials and citizens in the Midwest with information on spent-fuel inventories, current and projected additional storage requirements, licensing, storage technologies, and actions taken by various utilities in the Midwest to augment their capacity to store spent nuclear fuel on site.

  4. Method of preparing nuclear wastes for tansportation and interim storage

    DOEpatents

    Bandyopadhyay, Gautam; Galvin, Thomas M.

    1984-01-01

    Nuclear waste is formed into a substantially water-insoluble solid for temporary storage and transportation by mixing the calcined waste with at least 10 weight percent powdered anhydrous sodium silicate to form a mixture and subjecting the mixture to a high humidity environment for a period of time sufficient to form cementitious bonds by chemical reaction. The method is suitable for preparing an interim waste form from dried high level radioactive wastes.

  5. Interim Sanitary Landfill Groundwater Monitoring Report. 1997 Annual Report

    SciTech Connect

    1998-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 (formerly dWP-087A) and as part of the SRS Groundwater Monitoring Program.

  6. 105-H Reactor Interim Safe Storage Project Final Report

    SciTech Connect

    E.G. Ison

    2008-11-08

    The following information documents the decontamination and decommissioning of the 105-H Reactor facility, and placement of the reactor core into interim safe storage. The D&D of the facility included characterization, engineering, removal of hazardous and radiologically contaminated materials, equipment removal, decontamination, demolition of the structure, and restoration of the site. The ISS work also included construction of the safe storage enclosure, which required the installation of a new roofing system, power and lighting, a remote monitoring system, and ventilation components.

  7. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    HORNER, T.M.

    2000-10-16

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a].

  8. FRACTIONAL CRYSTALLIZATION LABORATORY TESTING WITH INTERIM PRETREATMENT SYSTEM FEEDS

    SciTech Connect

    HERTING DL

    2008-09-17

    The fractional crystallization process was developed as a pretreatment method for saltcake waste retrieved from Hanford single-shell tanks (SST). The process separates the retrieved SST waste into a high-level waste stream containing the bulk of the radionuclides and a low-activity waste stream containing the bulk of the nonradioactive sodium salts. The Interim Pretreatment System project shifted the focus on pretreatment planning from SST waste to double-shell tank waste.

  9. Terrestrial gravity data analysis for interim gravity model improvement

    NASA Technical Reports Server (NTRS)

    1987-01-01

    This is the first status report for the Interim Gravity Model research effort that was started on June 30, 1986. The basic theme of this study is to develop appropriate models and adjustment procedures for estimating potential coefficients from terrestrial gravity data. The plan is to use the latest gravity data sets to produce coefficient estimates as well as to provide normal equations to NASA for use in the TOPEX/POSEIDON gravity field modeling program.

  10. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    KOCH, M.R.

    1999-11-17

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  11. Interim Stabilization Equipment Essential and Support Drawing Plan

    SciTech Connect

    KOCH, M.R.

    1999-10-22

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings.

  12. A one-sided interim analysis with binary outcomes.

    PubMed

    Bristol, D R

    1988-09-01

    Wieand and Therneau (Controlled Clin Trials 8:20-28, 1987) proposed a technique for conducting a clinical trial to test the equality of response rates for two treatments using a one-sided test with an option of terminating the trial at the single interim analysis if it appears that the test treatment will offer no improvement over the control treatment. Chi, Bristol, and Castellana (Stat Med 5:387-392, 1986) considered a clinical trial with the same option when the treatments are compared with respect to the means of variables with normal distributions with a common known variance. Here a decision rule similar to the one proposed in the latter is employed for the problem examined in the former. This decision rule, a generalization of the one proposed by Wieand and Therneau, consists of a one-sided test at the final analysis with a one-sided test at the interim analysis, which is performed in the direction opposite to the one at the final analysis. It is shown that the proposed generalization may result in desirable properties regarding the probability of stopping the trial at the interim analysis in some situations.

  13. Smallpox Vaccine Injury Compensation Program: administrative implementation. Interim final rule.

    PubMed

    2003-12-16

    The Smallpox Emergency Personnel Protection Act of 2003 (SEPPA), authorizes the Secretary of Health and Human Services (the Secretary), to establish the Smallpox Vaccine Injury Compensation Program ("the Program"). This program is designed to provide benefits and/or compensation to certain persons harmed as a direct result of receiving smallpox covered countermeasures, including the smallpox vaccine, or as a direct result of contracting vaccinia through certain accidental exposures. In addition, the Secretary may provide death benefits to certain survivors of individuals who died as the direct result of these injuries. On August 27, 2003, the Secretary published an interim final rule that set out a Smallpox (Vaccinia) Vaccine Injury Table ("the Table"). The table includes adverse effects (including injuries, disabilities, conditions, and deaths) within specific time periods that shall be presumed to result from the receipt of, or exposure to, the smallpox vaccine. The Secretary will use this table, as well as the procedures set out in this regulation, in deciding whether persons are eligible to receive benefits under the program. In this interim final rule, the Secretary is setting out the administrative policies, procedures, and requirements governing the program, as authorized by the SEPPA. The Secretary is seeking public comment on this interim final rule.

  14. Immobilized high-level waste interim storage alternatives generation and analysis and decision report

    SciTech Connect

    CALMUS, R.B.

    1999-05-18

    This report presents a study of alternative system architectures to provide onsite interim storage for the immobilized high-level waste produced by the Tank Waste Remediation System (TWRS) privatization vendor. It examines the contract and program changes that have occurred and evaluates their impacts on the baseline immobilized high-level waste (IHLW) interim storage strategy. In addition, this report documents the recommended initial interim storage architecture and implementation path forward.

  15. Countermeasures Injury Compensation Program (CICP): administrative implementation, interim final rule. Interim final rule with request for comments.

    PubMed

    2010-10-15

    The Public Readiness and Emergency Preparedness Act (PREP Act) authorizes the Secretary of Health and Human Services (the Secretary) to establish the Countermeasures Injury Compensation Program (CICP or Program). The Department of Health and Human Services (HHS) is issuing this interim final rule with request for comments in order to establish administrative policies, procedures, and requirements for the CICP. This Program is designed to provide benefits to certain persons who sustain serious physical injuries or death as a direct result of administration or use of covered countermeasures identified by the Secretary in declarations issued under the PREP Act. In addition, the Secretary may provide death benefits to certain survivors of individuals who died as the direct result of such covered injuries or their health complications. The Secretary is seeking public comments on this interim final rule. PMID:20960976

  16. High level waste interim storge architecture selection - decision report

    SciTech Connect

    Calmus, R.B.

    1996-09-27

    The U.S. Department of Energy (DOE) has embarked upon a course to acquire Hanford Site tank waste treatment and immobilization services using privatized facilities (RL 1996a). This plan contains a two-phased approach. Phase I is a proof-of-principle/connnercial demonstration- scale effort and Phase II is a fiill-scale production effort. In accordance with the planned approach, interim storage and disposal of various products from privatized facilities are to be DOE fumished. The high-level waste (BLW) interim storage options, or alternative architectures, were identified and evaluated to provide the framework from which to select the most viable method of Phase I BLW interim storage (Calmus 1996). This evaluation, hereafter referred to as the Alternative Architecture Evaluation, was performed to established performance and risk criteria (technical merit, cost, schedule, etc.). Based on evaluation results, preliminary architectures and path forward reconunendations were provided for consideration in the architecture decision- maldng process. The decision-making process used for selection of a Phase I solidified BLW interim storage architecture was conducted in accordance with an approved Decision Plan (see the attachment). This decision process was based on TSEP-07,Decision Management Procedure (WHC 1995). The established decision process entailed a Decision Board, consisting of Westinghouse Hanford Company (VY`HC) management staff, and included appointment of a VTHC Decision Maker. The Alternative Architecture Evaluation results and preliminary recommendations were presented to the Decision Board members for their consideration in the decision-making process. The Alternative Architecture Evaluation was prepared and issued before issuance of @C-IP- 123 1, Alternatives Generation and Analysis Procedure (WI-IC 1996a), but was deemed by the Board to fully meet the intent of WHC-IP-1231. The Decision Board members concurred with the bulk of the Alternative Architecture

  17. Interim rules amending ERISA disclosure requirements for group health plans--DoL. Interim rules with request for comments.

    PubMed

    1997-04-01

    This document contains interim rules governing the content of the summary plan description (SPD) for group health plans, the furnishing of summaries of material reductions in covered services or benefits by group health plans, and the disclosure of SPD and related information through electronic media. The rules contained in this document implement amendments to the disclosure provisions of the Employee Retirement Income Security Act of 1974 (ERISA) enacted as part of the Health Insurance Portability and Accountability Act of 1996 (HIPAA) and the Newborns' and Mothers' Health Protection Act of 1996 (NMHPA). Interested persons are invited to submit comments on the interim rules for consideration by the Department in developing final rules. The rules contained in this document are being adopted on an interim basis to accommodate statutorily established time frames intended to ensure that sponsors and administrators of group health plans, as well as participants and beneficiaries covered by such plans, have timely guidance concerning compliance with the recently enacted amendments to ERISA.

  18. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13

  19. Protecting the confidentiality of interim data: addressing current challenges.

    PubMed

    Fleming, Thomas R

    2015-02-01

    There is compelling evidence supporting the importance of maintaining confidentiality of interim data in clinical trials designed to reliably address the benefit-to-risk profile of interventions. While this is widely recognized, creative approaches are needed to achieve this in challenging settings where interim data are released for regulatory review and action, even though the trial would be continued to address its primary hypothesis. An illustration is the recently emerging setting of cardiovascular safety trials in type 2 diabetes mellitus. At the first stage of such trials, if large relative increases in cardiovascular major morbidity/mortality can be ruled out, data can be released solely for the purpose of allowing regulatory decision making about marketing approval. The trial is then continued in the post-marketing setting to address the primary hypothesis regarding whether smaller relative increases can be ruled out. Active rather than passive approaches are needed to protect the integrity of cardiovascular safety trials. Given the importance to trial integrity of maintaining confidentiality of interim data such as the estimated relative effect on cardiovascular risk, a Data Access Plan should be in place in these trials to ensure such data are not revealed to study participants and their caregivers, investigators involved in trial conduct, the sponsor's management team, and the public, until trial completion. A Performance Standards Document also should be developed to pre-specify targeted and minimally acceptable levels for recruitment rate, best real-world achievable adherence, avoidance of cross-ins, and retention rate. This document should specify creative approaches for achieving these targets, oversight procedures during trial conduct to monitor performance levels, and actions to be taken if emerging data indicate minimally acceptable levels are not being reached. In settings where meaningful breaches in confidentiality have occurred, such

  20. Protecting the confidentiality of interim data: addressing current challenges.

    PubMed

    Fleming, Thomas R

    2015-02-01

    There is compelling evidence supporting the importance of maintaining confidentiality of interim data in clinical trials designed to reliably address the benefit-to-risk profile of interventions. While this is widely recognized, creative approaches are needed to achieve this in challenging settings where interim data are released for regulatory review and action, even though the trial would be continued to address its primary hypothesis. An illustration is the recently emerging setting of cardiovascular safety trials in type 2 diabetes mellitus. At the first stage of such trials, if large relative increases in cardiovascular major morbidity/mortality can be ruled out, data can be released solely for the purpose of allowing regulatory decision making about marketing approval. The trial is then continued in the post-marketing setting to address the primary hypothesis regarding whether smaller relative increases can be ruled out. Active rather than passive approaches are needed to protect the integrity of cardiovascular safety trials. Given the importance to trial integrity of maintaining confidentiality of interim data such as the estimated relative effect on cardiovascular risk, a Data Access Plan should be in place in these trials to ensure such data are not revealed to study participants and their caregivers, investigators involved in trial conduct, the sponsor's management team, and the public, until trial completion. A Performance Standards Document also should be developed to pre-specify targeted and minimally acceptable levels for recruitment rate, best real-world achievable adherence, avoidance of cross-ins, and retention rate. This document should specify creative approaches for achieving these targets, oversight procedures during trial conduct to monitor performance levels, and actions to be taken if emerging data indicate minimally acceptable levels are not being reached. In settings where meaningful breaches in confidentiality have occurred, such

  1. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI... 42 Public Health 1 2012-10-01 2012-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...

  2. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a) ORI... 42 Public Health 1 2014-10-01 2014-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN...

  3. 75 FR 52597 - Availability of Interim Procedures for Federal External Review and Model Notices Relating to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Departments published interim final regulations implementing PHS Act section 2719 on July 23, 2010, at 75 FR... interim final regulations implementing section 1251 of the Affordable Care Act on June 17, 2010, at 75 FR....healthcare.gov . SUPPLEMENTARY INFORMATION: I. Background The Patient Protection and Affordable Care Act...

  4. 32 CFR 643.36 - Policy-Interim leasing of excess properties to facilitate economic readjustment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Policy-Interim leasing of excess properties to facilitate economic readjustment. 643.36 Section 643.36 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE Policy § 643.36 Policy—Interim leasing of...

  5. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CFR part 79 registration, and must also accurately identify if the detergent, at that concentration... interim detergent program controls and prohibitions. 80.156 Section 80.156 Protection of Environment... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls...

  6. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CFR part 79 registration, and must also accurately identify if the detergent, at that concentration... interim detergent program controls and prohibitions. 80.156 Section 80.156 Protection of Environment... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls...

  7. 40 CFR 80.156 - Liability for violations of the interim detergent program controls and prohibitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CFR part 79 registration, and must also accurately identify if the detergent, at that concentration... interim detergent program controls and prohibitions. 80.156 Section 80.156 Protection of Environment... Detergent Gasoline § 80.156 Liability for violations of the interim detergent program controls...

  8. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a limited time…

  9. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will become... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT...

  10. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will become... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT...

  11. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... with the American War Risk Agency, 14 Wall Street, New York, New York 10005. All interim binders on U.S... Wall Street, New York, New York 10005. All interim binders on foreign-flag vessels will become... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT...

  12. 78 FR 76160 - Public Housing Assessment System (PHAS) Capital Fund Interim Scoring Notice: Reinstitution of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-16

    ... by an interim rule published on February 23, 2011, at 76 FR 10136. The Capital Fund Program Indicator... Scoring Notice, also published on February 23, 2011, at 76 FR 10053. Under this indicator, PHAs can... Capital Fund by an interim notice for public comment, 77 FR 34399 (Monday, June 11, 2012), which...

  13. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe...

  14. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe...

  15. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe...

  16. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe...

  17. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Petitions for waiver and applications for interim waiver... Petition for Waiver, to the Assistant Secretary for Conservation and Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver shall reference the Petition for Waiver by identifying...

  18. 10 CFR 430.27 - Petitions for waiver and applications for interim waiver.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Petitions for waiver and applications for interim waiver... Petition for Waiver, to the Assistant Secretary for Conservation and Renewable Energy, U.S. Department of Energy. Each Application for Interim Waiver shall reference the Petition for Waiver by identifying...

  19. The Impact of Indiana's System of Interim Assessments on Mathematics and Reading Achievement

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Miller, Shazia Rafiullah; van der Ploeg, Arie

    2013-01-01

    Interim assessments are increasingly common in U.S. schools. We use high-quality data from a large-scale school-level cluster randomized experiment to examine the impact of two well-known commercial interim assessment programs on mathematics and reading achievement in Indiana. Results indicate that the treatment effects are positive but not…

  20. 78 FR 56752 - Interim Staff Guidance Specific Environmental Guidance for Integral Pressurized Water Reactors...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... comment on, draft Interim Staff Guidance (ISG) ESP/COL-ISG-027, ``Interim Staff Guidance Specific..., early site permits (ESPs), and combined licenses (COLs). DATES: Submit comments by October 15, 2013... issues ESP/COL-ISGs to facilitate timely implementation of current staff guidance and to...

  1. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants...

  2. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants...

  3. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants...

  4. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants...

  5. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants...

  6. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the...

  7. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the...

  8. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Interim approval of the Carbon Monoxide plan for the South Coast. 52.243 Section 52.243 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.243 Interim approval of the...

  9. 42 CFR 93.401 - Interaction with other offices and interim actions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Interaction with other offices and interim actions. 93.401 Section 93.401 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES... Human Services General Information § 93.401 Interaction with other offices and interim actions. (a)...

  10. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Interim approval of the Carbon Monoxide... § 52.243 Interim approval of the Carbon Monoxide plan for the South Coast. The Carbon Monoxide plan for... such earlier date the State has submitted as a SIP revision a demonstration that the carbon...

  11. 40 CFR 52.243 - Interim approval of the Carbon Monoxide plan for the South Coast.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Interim approval of the Carbon Monoxide... § 52.243 Interim approval of the Carbon Monoxide plan for the South Coast. The Carbon Monoxide plan for... such earlier date the State has submitted as a SIP revision a demonstration that the carbon...

  12. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” may be used as... systems. 280.11 Section 280.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... UNDERGROUND STORAGE TANKS (UST) Program Scope and Interim Prohibition § 280.11 Interim prohibition...

  13. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” may be used as... systems. 280.11 Section 280.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... UNDERGROUND STORAGE TANKS (UST) Program Scope and Interim Prohibition § 280.11 Interim prohibition...

  14. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” may be used as... systems. 280.11 Section 280.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... UNDERGROUND STORAGE TANKS (UST) Program Scope and Interim Prohibition § 280.11 Interim prohibition...

  15. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” may be used as... systems. 280.11 Section 280.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... UNDERGROUND STORAGE TANKS (UST) Program Scope and Interim Prohibition § 280.11 Interim prohibition...

  16. 40 CFR 280.11 - Interim prohibition for deferred UST systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Corrosion on Metallic Buried, Partially Buried, or Submerged Liquid Storage Systems,” may be used as... systems. 280.11 Section 280.11 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID... UNDERGROUND STORAGE TANKS (UST) Program Scope and Interim Prohibition § 280.11 Interim prohibition...

  17. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    SciTech Connect

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  18. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    SciTech Connect

    CONRAD EA

    2008-08-12

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel.

  19. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    SciTech Connect

    Burgard, K.C.

    1998-04-09

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  20. Conceptual design report for immobilized high-level waste interim storage facility (Phase 1)

    SciTech Connect

    Burgard, K.C.

    1998-06-02

    The Hanford Site Canister Storage Building (CSB Bldg. 212H) will be utilized to interim store Phase 1 HLW products. Project W-464, Immobilized High-Level Waste Interim Storage, will procure an onsite transportation system and retrofit the CSB to accommodate the Phase 1 HLW products. The Conceptual Design Report establishes the Project W-464 technical and cost basis.

  1. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... COMMISSION Draft Spent Fuel Storage and Transportation Interim Staff Guidance AGENCY: Nuclear Regulatory... Regulatory Commission (NRC) requests public comment on Draft Spent Fuel Storage and Transportation Interim... Integrity for Continued Storage of High Burnup Fuel Beyond 20 Years.'' The draft SFST-ISG provides...

  2. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe...

  3. Effects of Interim Assessments across the Achievement Distribution: Evidence From an Experiment

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2016-01-01

    We use data from a large-scale experiment conducted in Indiana in 2009-2010 to examine the impact of two interim assessment programs (mCLASS and Acuity) across the mathematics and reading achievement distributions. Specifically, we focus on whether the use of interim assessments has a particularly strong effect on improving outcomes for low…

  4. 47 CFR 73.9008 - Interim approval of authorized digital output protection technologies and authorized recording...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Interim approval of authorized digital output... COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Broadcast Television Redistribution Control § 73.9008 Interim approval of authorized digital output...

  5. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false Interim status incinerators burning... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 265.352 Interim status incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to...

  6. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 27 2012-07-01 2012-07-01 false Interim status incinerators burning... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 265.352 Interim status incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to...

  7. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Interim status incinerators burning... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 265.352 Interim status incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to...

  8. 40 CFR 265.352 - Interim status incinerators burning particular hazardous wastes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 27 2013-07-01 2013-07-01 false Interim status incinerators burning... HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Incinerators § 265.352 Interim status incinerators burning particular hazardous wastes. (a) Owners or operators of incinerators subject to...

  9. Shuttle/IUS performance for planetary missions. [Interim Upper Stage

    NASA Technical Reports Server (NTRS)

    Cork, M. J.; Driver, J. M.; Wright, J. L.

    1975-01-01

    Potential requirements for planetary missions in the 1980s, capabilities of the Interim Upper Stage (IUS) candidates to perform those missions, and Shuttle/IUS mission profile options for performance enhancement are examined. The most demanding planetary missions are the Pioneer Saturn/Uranus/Titan Probe and the Mariner-class orbiters of Mercury, Jupiter, and Saturn. Options available to designers of these missions will depend on the specific IUS selected for development and the programmatic phasing of the IUS and the NASA Tug. Use of Shuttle elliptic orbits as initial conditions for IUS ignition offers significant performance improvements; specific values are mission dependent.

  10. Hanford low-level tank waste interim performance assessment

    SciTech Connect

    Mann, F.M.

    1996-09-16

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single- and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and its performance as early as possible in the project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  11. Dosimetry at an interim storage for spent nuclear fuel.

    PubMed

    Králík, M; Kulich, V; Studeny, J; Pokorny, P

    2007-01-01

    The Czech nuclear power plant Dukovany started its operation in 1985. All fuel spent from 1985 up to the end of 2005 is stored at a dry interim storage, which was designed for 60 CASTOR-440/84 casks. Each of these casks can accommodate 84 fuel assemblies from VVER 440 reactors. Neutron-photon mixed fields around the casks were characterized in terms of ambient dose equivalent measured by standard area dosemeters. Except this, neutron spectra were measured by means of a Bonner sphere spectrometer, and the measured spectra were used to derive the corresponding ambient dose equivalent due to neutrons.

  12. Performance evaluation of the JPL interim digital SAR processor

    NASA Technical Reports Server (NTRS)

    Wu, C.; Barkan, B.; Curlander, J.; Jin, M.; Pang, S.

    1983-01-01

    The performance of the Interim Digital SAR Processor (IDP) was evaluated. The IDP processor was originally developed for experimental processing of digital SEASAT SAR data. One phase of the system upgrade which features parallel processing in three peripheral array processors, automated estimation for Doppler parameters, and unsupervised image pixel location determination and registration was executed. The method to compensate for the target range curvature effect was improved. A four point interpolation scheme is implemented to replace the nearest neighbor scheme used in the original IDP. The processor still maintains its fast throughput speed. The current performance and capability of the processing modes now available on the IDP system are updated.

  13. Maryland Bridge: An Interim Prosthesis for Tooth Replacement in Adolescents

    PubMed Central

    Jyoti, Sapna; Kaul, Rupali Borkar; Sethi, Ntasha

    2011-01-01

    A space in the anterior region of the dental arch of a youngster, either due to trauma or a congenitally missing tooth, can not only lead to psychological trauma but also create a functional dilemma for the dentist, as the usual treatment options of implant, removable partial denture and fixed partial denture available for adults, are often inapplicable or inconvenient for an adolescent. In such a situation, a resin-bonded fixed partial denture (RBFPD), such as Maryland Bridge fulfills all the requirements of an ideal interim solution till growth completion is achieved and a more permanent tooth replacement option can be explored.

  14. Medicare Interim Payment System's Impact on Medicare Home Health Utilization

    PubMed Central

    Liu, Korbin; Long, Sharon K.; Dowling, Krista

    2003-01-01

    The Medicare home health interim payment system (IPS) implemented in fiscal year 1998 provided very strong incentives for home health agencies (HHAs) to reduce the number of visits provided to each Medicare user and to avoid those beneficiaries whose Medicare plan of care was likely to exceed the average beneficiary cost limit. We analyzed multiple years of data from the Medicare Current Beneficiary Survey (MCBS) to examine how the IPS affected subgroups of the Medicare population by health and socioeconomic characteristics. We found that the IPS strongly reduced overall utilization, but that few subgroups were disproportionately affected. PMID:14997695

  15. Hanford low-level tank waste interim performance assessment

    SciTech Connect

    Mann, F.M.

    1997-09-12

    The Hanford Low-Level Tank Waste Interim Performance Assessment examines the long-term environmental and human health effects associated with the disposal of the low-level fraction of the Hanford single and double-shell tank waste in the Hanford Site 200 East Area. This report was prepared as a good management practice to provide needed information about the relationship between the disposal system design and performance early in the disposal system project cycle. The calculations in this performance assessment show that the disposal of the low-level fraction can meet environmental and health performance objectives.

  16. US PRACTICE FOR INTERIM WET STORAGE OF RRSNF

    SciTech Connect

    Vinson, D.

    2010-08-05

    Aluminum research reactor spent nuclear fuel is currently being stored or is anticipated to be returned to the United States and stored at Department of Energy storage facilities at the Savannah River Site and the Idaho Nuclear Technology and Engineering Center. This paper summarizes the current practices to provide for continued safe interim wet storage in the U.S. Aluminum fuel stored in poor quality water is subject to aggressive corrosion attack and therefore water chemistry control systems are essential to maintain water quality. Fuel with minor breaches are safely stored directly in the basin. Fuel pieces and heavily damaged fuel is safely stored in isolation canisters.

  17. Chesapeake Bay fall line toxics monitoring program: 1992 interim report

    SciTech Connect

    Dobler, E.; Nemura, A.

    1994-04-01

    The report provides an interim assessment of toxic substance loadings from the fall lines of three major tributaries, Susquehanna, Potomac and James Rivers, to the Chesapeake Bay. Results from the first six months of a one year sampling program conducted from March, 1992 to September, 1992 are described. Loadings are provided for trace metals; synthetic organic compounds; organonitrogen, organophosphorus, and organochlorine pesticides; polychlorinated biphenyl congeners; and polycyclic aromatic hydrocarbons. The program included sampling during both base and storm flow conditions. A key component of the report is the comparison of ultra clean versus standard U.S. Geological Survey protocol collection techniques for trace metals and organics.

  18. Dosimetry at an interim storage for spent nuclear fuel.

    PubMed

    Králík, M; Kulich, V; Studeny, J; Pokorny, P

    2007-01-01

    The Czech nuclear power plant Dukovany started its operation in 1985. All fuel spent from 1985 up to the end of 2005 is stored at a dry interim storage, which was designed for 60 CASTOR-440/84 casks. Each of these casks can accommodate 84 fuel assemblies from VVER 440 reactors. Neutron-photon mixed fields around the casks were characterized in terms of ambient dose equivalent measured by standard area dosemeters. Except this, neutron spectra were measured by means of a Bonner sphere spectrometer, and the measured spectra were used to derive the corresponding ambient dose equivalent due to neutrons. PMID:17526479

  19. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ... COMMISSION License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is issuing the final License Renewal Interim Staff Guidance...

  20. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... AGENCY RIN 2050-ZA05 Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA... announcing a 50-day public comment period for draft recommended interim preliminary remediation goals (PRGs) developed in the Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at...

  1. 75 FR 43329 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Internal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-23

    ... Register on April 14, 2010 (75 FR 19297). The second phase was interim final regulations implementing PHS... Register on May 13, 2010 (75 FR 27122). The third phase was interim final regulations implementing section... Federal Register on June 17, 2010 (75 FR 34538). The fourth phase was interim final...

  2. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... COMMISSION Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon... Commission (NRC) is issuing for public comment draft Interim Staff Guidance, ``Evaluations of Uranium....1301.'' This Interim Staff Guidance provides guidance to the NRC staff for evaluating uranium...

  3. Fast Flux Test Facility interim examination and maintenance cell: Past, present, and future

    SciTech Connect

    Vincent, J.R.

    1990-09-01

    The Fast Flux Test Facility Interim Examination and Maintenance Cell was designed to perform interim examination and/or disassembly of experimental core components for final analysis elsewhere, as well as maintenance of sodium-wetted or neutron-activated internal reactor parts and plant support hardware. The Interim Examination and Maintenance Cell equipment developed and used for the first ten years of operation has been primarily devoted to the disassembly and examination of core component test assemblies. While no major reactor equipment has required remote repair or maintenance, the Interim Examina Examination and Maintenance Cell has served as the remote repair facility for its own in-cell equipment, and several innovative remote repairs have been accomplished. The Interim Examination and Maintenance Cell's demonstrated versatility has shown its capability to support a challenging future. 12 refs., 9 figs.

  4. Interim sanitary landfill groundwater monitoring report. 1996 Annual report

    SciTech Connect

    Bagwell, L.A.

    1997-01-01

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site. These wells are sampled semiannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500-1120 and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane and 1,1,1-trichloroethane were elevated in one sidegradient well and one downgradient well during 1996. Zinc was elevated in three downgradient wells and also was detected in the associated laboratory blanks for two of those wells. Specific conductance was elevated in one background well and one sidegradient well. Barium and copper exceeded standards in one sidegradient well, and dichloromethane (a common laboratory contaminant) was elevated in another sidegradient well. Barium, copper, and dichloromethane were detected in the associated blanks for these wells, also. The groundwater flow direction in the Steed Pond Acquifer (Water Table) beneath the Interim Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 210 ft/year during first quarter 1996 and 180 ft/yr during third quarter 1996.

  5. Expedited approach to a carbon tetrachloride spill interim remedial action

    SciTech Connect

    Cowdery, C.; Primrose, A.; Uhland, J.; Castaneda, N.

    1998-07-01

    Monitored natural attenuation was selected as an interim measure for a carbon tetrachloride spill site where source removal or in situ treatment cannot currently be implemented due to the surrounding infrastructure. Rather than delay action until the site is more accessible to an interim action, this more expedited approach would support a final action. Individual Hazard Substance Site (IHSS) 118.1 is a former underground storage tank at Rocky Flats Environmental Technology Site (RFETS) that stored carbon tetrachloride for process use. Inadvertent releases associated with filling and failure of the tank system resulted in an accumulation of carbon tetrachloride in a bedrock depression around a group of former process waste tanks. Access to the source of contamination is obstructed by numerous utilities, the process waste tanks, and other components of the site infrastructure that limit the ability to conduct an effective remedial action. A preremedial field investigation was conducted in September 1997 to identify and delineate the extent of the dense nonaqueous phase liquid (DNAPL) in the subsurface. Data collected from the investigation revealed that natural processes might be limiting the migration of contaminants from the source area.

  6. HOAPS and ERA-Interim precipitation over the sea: validation against shipboard in situ measurements

    NASA Astrophysics Data System (ADS)

    Bumke, Karl; König-Langlo, Gert; Kinzel, Julian; Schröder, Marc

    2016-06-01

    The satellite-derived HOAPS (Hamburg Ocean Atmosphere Parameters and Fluxes from Satellite Data) and ECMWF (European Centre for Medium-Range Weather Forecasts) ERA-Interim reanalysis data sets have been validated against in situ precipitation measurements from ship rain gauges and optical disdrometers over the open ocean by applying a statistical analysis for binary estimates. For this purpose collocated pairs of data were merged within a certain temporal and spatial threshold into single events, according to the satellites' overpass, the observation and the ERA-Interim times. HOAPS detects the frequency of precipitation well, while ERA-Interim strongly overestimates it, especially in the tropics and subtropics. Although precipitation rates are difficult to compare because along-track point measurements are collocated with areal estimates and the number of available data are limited, we find that HOAPS underestimates precipitation rates, while ERA-Interim's Atlantic-wide average precipitation rate is close to measurements. However, when regionally averaged over latitudinal belts, deviations between the observed mean precipitation rates and ERA-Interim exist. The most obvious ERA-Interim feature is an overestimation of precipitation in the area of the intertropical convergence zone and the southern subtropics over the Atlantic Ocean. For a limited number of snow measurements by optical disdrometers, it can be concluded that both HOAPS and ERA-Interim are suitable for detecting the occurrence of solid precipitation.

  7. Realization of the German Concept for Interim Storage of Spent Nuclear Fuel - Current Situation and Prospects

    SciTech Connect

    Thomauske, B. R.

    2003-02-25

    The German government has determined a phase out of nuclear power. With respect to the management of spent fuel it was decided to terminate transports to reprocessing plants by 2005 and to set up interim storage facilities on power plant sites. This paper gives an overview of the German concept for spent fuel management focused on the new on-site interim storage concept and the applied interim storage facilities. Since the end of the year 1998, the utilities have applied for permission of on-site interim storage in 13 storage facilities and 5 storage areas; one application for the interim storage facility Stade was withdrawn due to the planned final shut down of Stade nuclear power plant in autumn 2003. In 2001 and 2002, 3 on-site storage areas and 2 on-site storage facilities for spent fuel were licensed by the Federal Office for Radiation Protection (BfS). A main task in 2002 and 2003 has been the examination of the safety and security of the planned interim storage facilities and the verification of the licensing prerequisites. In the aftermath of September 11, 2001, BfS has also examined the attack with a big passenger airplane. Up to now, these aircraft crash analyses have been performed for three on-site interim storage facilities; the fundamental results will be presented. It is the objective of BfS to conclude the licensing procedures for the applied on-site interim storage facilities in 2003. With an assumed construction period for the storage buildings of about two years, the on-site interim storage facilities could then be available in the year 2005.

  8. Survey of the use of the interim hospital order in Scotland (1985-94).

    PubMed

    White, T; Douds, F; Henderson, T; Anderson, J

    2001-01-01

    A retrospective case note review was undertaken of all admissions to the State Hospital under an Interim Hospital Order between 1985 and 1994 (n = 73). This represented 89 per cent of all Interim Orders made by the Scottish courts during this time period. Thirty-one per cent of patients received a non hospital disposal at the end of the assessment. Seventy-eight per cent of the interim hospital orders were for a period of three months of less. The demographic, illness and offense backgrounds of the group is presented. In addition, the outcome of the assessment is discussed in the light of current legislative changes.

  9. Interim Site Assessment and Clean-up Guidebook

    SciTech Connect

    Elliott, K.L.

    1996-12-31

    In April 1995 an Interim Site Investigation and Clean-up Guidebook (for petroleum hydrocarbon and volatile organic compound impacted sites) was developed for public use. The purpose of the Guidebook was to offer a new approach to the site cleanup process: one that reduces time, cuts costs, and establishes a defined endpoint for investigations and cleanup actions. The Guidebook provided a matrix to screen for low-risk contaminated sites. After a year of use, the Guidebook was revised in May 1996. The most notable change was in the Petroleum Hydrocarbon Section and the modification of the screening table for petroleum hydrocarbon contaminated sites. The changes considered the strong influence of lithology on contaminant transport and recognized the large attenuation of the long chain, heavy oil and tar, hydrocarbons in soils.

  10. Veterans Employment Pay for Success Grant Program. Interim final rule.

    PubMed

    2016-08-10

    The Department of Veterans Affairs (VA) is establishing a grant program (Veterans Employment Pay for Success (VEPFS)) under the authority of the U.S.C. to award grants to eligible entities to fund projects that are successful in accomplishing employment rehabilitation for Veterans with service-connected disabilities. VA will award grants on the basis of an eligible entity's proposed use of a Pay for Success (PFS) strategy to achieve goals. This interim final rule establishes regulations for awarding a VEPFS grant, including the general process for awarding the grant, criteria and parameters for evaluating grant applications, priorities related to the award of a grant, and general requirements and guidance for administering a VEPFS grant program. PMID:27529903

  11. Health Resources Priority and Allocations System (HRPAS). Interim final rule.

    PubMed

    2015-07-17

    This interim final rule establishes standards and procedures by which the U.S. Department of Health and Human Services (HHS) may require that certain contracts or orders that promote the national defense be given priority over other contracts or orders. This rule also sets new standards and procedures by which HHS may allocate materials, services, and facilities to promote the national defense. This rule will implement HHS's administration of priorities and allocations actions, and establish the Health Resources Priorities and Allocation System (HRPAS). The HRPAS will cover health resources pursuant to the authority under Section 101(c) of the Defense Production Act as delegated to HHS by Executive Order 13603. Priorities authorities (and other authorities delegated to the Secretary in E.O. 13603, but not covered by this regulation) may be re-delegated by the Secretary. The Secretary retains the authority for allocations.

  12. Science Opportunities Enabled by NASA's Constellation System: Interim Report

    NASA Technical Reports Server (NTRS)

    2008-01-01

    In 2004 NASA initiated studies of advanced science mission concepts known as the Vision Missions and inspired by a series of NASA roadmap activities conducted in 2003. Also in 2004 NASA began implementation of the first phases of a new space exploration policy, the Vision for Space Exploration. This implementation effort included development of a new human-carrying spacecraft, known as Orion, and two new launch vehicles, the Ares I and Ares V rockets.collectively called the Constellation System. NASA asked the National Research Council (NRC) to evaluate the science opportunities enabled by the Constellation System (see Preface) and to produce an interim report on a short time schedule and a final report by November 2008. The committee notes, however, that the Constellation System and its Orion and Ares vehicles have been justified by NASA and selected in order to enable human exploration beyond low Earth orbit, and not to enable science missions. This interim report of the Committee on Science Opportunities Enabled by NASA s Constellation System evaluates the 11 Vision Mission studies presented to it and groups them into two categories: those more deserving of future study, and those less deserving of future study. Although its statement of task also refers to Earth science missions, the committee points out that the Vision Missions effort was focused on future astronomy, heliophysics, and planetary exploration and did not include any Earth science studies because, at the time, the NRC was conducting the first Earth science decadal survey, and funding Earth science studies as part of the Vision Missions effort would have interfered with that process. Consequently, no Earth science missions are evaluated in this interim report. However, the committee will evaluate any Earth science mission proposal submitted in response to its request for information issued in March 2008 (see Appendix A). The committee based its evaluation of the preexisting Vision Missions studies

  13. SNF Interim Storage Canister Corrosion and Surface Environment Investigations

    SciTech Connect

    Bryan, Charles R.; Enos, David G.

    2015-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of spent nuclear fuel (SNF). Of particular concern is stress corrosion cracking (SCC), by which a through-wall crack could potentially form in a canister outer wall over time intervals that are shorter than possible dry storage times. In order for SCC to occur, three criteria must be met. A corrosive environment must be present on the canister surface, the metal must susceptible to SCC, and sufficient tensile stress to support SCC must be present through the entire thickness of the canister wall. SNL is currently evaluating the potential for each of these criteria to be met.

  14. Advanced nuclear reactor public opinion project. Interim report

    SciTech Connect

    Benson, B.

    1991-07-25

    This Interim Report summarizes the findings of our first twenty in-depth interviews in the Advanced Nuclear Reactor Public Opinion Project. We interviewed 6 industry trade association officials, 3 industry attorneys, 6 environmentalists/nuclear critics, 3 state officials, and 3 independent analysts. In addition, we have had numerous shorter discussions with various individuals concerned about nuclear power. The report is organized into the four categories proposed at our April, 1991, Advisory Group meeting: safety, cost-benefit analysis, science education, and communications. Within each category, some change of focus from that of the Advisory Group has been required, to reflect the findings of our interviews. This report limits itself to describing our findings. An accompanying memo draws some tentative conclusions.

  15. Interim sanitary landfill groundwater monitoring report. 1995 annual report

    SciTech Connect

    Bagwell, L.

    1996-04-24

    Eight wells of the LFW series monitor groundwater quality in the Steed Pond Aquifer (Water Table) beneath the Interim Sanitary Landfill at the Savannah River Site (SRS). These wells are sampled biannually to comply with the South Carolina Department of Health and Environmental Control Modified Municipal Solid Waste Permit 025500- 1120 (formerly DWP-087A) and as part of the SRS Groundwater Monitoring Program. Trichlorofluoromethane was elevated in one downgradient and one sidegradient well during 1995. Barium, 1, 1- dichloroethylene, specific conductance, and zinc exceeded standards in one well each. The elevated level of 1, 1-dichloroethylene occurred in a downgradient well. The groundwater flow direction in the Steed Pond Aquifer (Water Table) beneath the Sanitary Landfill was to the southeast (universal transverse Mercator coordinates). The flow rate in this unit was approximately 190 ft/year during first quarter 1995 and 150 ft/yr during third quarter 1995.

  16. Radiation analysis for a generic centralized interim storage facility

    SciTech Connect

    Gillespie, S.G.; Lopez, P.; Eble, R.G.

    1997-07-01

    This paper documents the radiation analysis performed for the storage area of a generic Centralized Interim Storage Facility (CISF) for commercial spent nuclear fuel (SNF) to establish the CISF Protected Area, Unrestricted Area, and Restricted Area boundaries. In order to model a large (6000 cask) storage array with a reasonable amount of analysis time and effort, a simplified calculational model was developed for the CISF. The CISF is designed to accommodate several different types of SNF storage systems. In order to simplify the calculation of dose rates from the storage area, the Westinghouse Large PWR Multi-Purpose Canister (MPC) is selected as a representative storage system, since sufficient information is contained in its Safety Analysis Report to allow accurate modeling, and the surface dose rates on the MPC are consistent with other storage systems.

  17. Radiation analysis for a generic centralized interim storage facility

    SciTech Connect

    Gillespie, S.G.; Lopez, P.; Eble, R.G.

    1997-12-31

    This paper documents the radiation analysis performed for the storage area of a generic Centralized Interim Storage Facility (CISF) for commercial spent nuclear fuel (SNF). The purpose of the analysis is to establish the CISF Protected Area and Restricted Area boundaries by modeling a representative SNF storage array, calculating the radiation dose at selected locations outside the storage area, and comparing the results with regulatory radiation dose limits. The particular challenge for this analysis is to adequately model a large (6000 cask) storage array with a reasonable amount of analysis time and effort. Previous analyses of SNF storage systems for Independent Spent Fuel Storage Installations at nuclear plant sites (for example in References 5.1 and 5.2) had only considered small arrays of storage casks. For such analyses, the dose contribution from each storage cask can be modeled individually. Since the large number of casks in the CISF storage array make such an approach unrealistic, a simplified model is required.

  18. Recommended alternative for interim stabilization of Tank 241-C-103

    SciTech Connect

    Dukelow, G.T.; Turner, D.A.; Grigsby, J.M.

    1995-04-01

    The waste in tank 241-C-103 poses several health and safety risks and potential soil contamination caused by tank leaks. To minimize the risk of contaminating the soil beneath the tank, the pumpable waste liquids are planned to be removed by salt well pumping. In addition to aqueous liquids, this tank is unique because it also contains a layer of degraded PUREX solvent floating on the aqueous liquid. The following three options for removing and storing this separable phase organic solvent have been proposed and studied: transferring the organic solvent and pumpable aqueous liquids using existing salt well pumping equipment and procedures to a double-shell tank (DST) for storage; removing most of the organic solvent using a skimmer pump, then salt well pumping the remaining pumpable liquids to a different DST for storage; removing most of the organic solvent to an aboveground storage tank for eventual treatment or offsite transfer, and then salt well pumping the remaining pumpable liquids to a DST for interim storage. As a result of evaluating these three options and a no pumping option, the recommended action is to transfer both the organic solvent and pumpable aqueous liquid to a DST for storage using existing salt well pumping equipment. The evaluation considers the following criteria: public health and safety, worker safety, environmental compliance, engineering feasibility, and cost. The options compared these factors. Two key areas drove the selection of the recommended approach: the minimization of potential soil contamination from tank leaks caused the (interim stabilization by salt well pumping) options to be rated more highly than the no pumping option; and cost and implementation factors caused the transfer and storage to DST using existing tank farm salt well pumping equipment option to rate higher than the skimming options. Other factors have only a second order effect on the selection process. Evaluation results are described in this report.

  19. Waste Encapsulation and Storage Facility (WESF) Interim Status Closure Plan

    SciTech Connect

    SIMMONS, F.M.

    2000-12-01

    This document describes the planned activities and performance standards for closing the Waste Encapsulation and Storage Facility (WESF). WESF is located within the 225B Facility in the 200 East Area on the Hanford Facility. Although this document is prepared based on Title 40 Code of Federal Regulations (CFR), Part 265, Subpart G requirements, closure of the storage unit will comply with Washington Administrative Code (WAC) 173-303-610 regulations pursuant to Section 5.3 of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Action Plan (Ecology et al. 1996). Because the intention is to clean close WESF, postclosure activities are not applicable to this interim status closure plan. To clean close the storage unit, it will be demonstrated that dangerous waste has not been left onsite at levels above the closure performance standard for removal and decontamination. If it is determined that clean closure is not possible or environmentally is impracticable, the interim status closure plan will be modified to address required postclosure activities. WESF stores cesium and strontium encapsulated salts. The encapsulated salts are stored in the pool cells or process cells located within 225B Facility. The dangerous waste is contained within a double containment system to preclude spills to the environment. In the unlikely event that a waste spill does occur outside the capsules, operating methods and administrative controls require that waste spills be cleaned up promptly and completely, and a notation made in the operating record. Because dangerous waste does not include source, special nuclear, and by-product material components of mixed waste, radionuclides are not within the scope of this documentation. The information on radionuclides is provided only for general knowledge.

  20. 1998 interim 242-A Evaporator tank system integrity assessment report

    SciTech Connect

    Jensen, C.E.

    1998-07-02

    This Integrity Assessment Report (IAR) is prepared by Fluor Daniel Northwest (FDNW) under contract to Lockheed-Martin Hanford Company (LMHC) for Waste Management Hanford (WMH), the 242-A Evaporator (facility) operations contractor for Fluor Daniel Hanford, and the US Department of Energy, the system owner. The contract specifies that FDNW perform an interim (5 year) integrity assessment of the facility and prepare a written IAR in accordance with Washington Administrative Code (WAC) 173-303-640. The WAC 173-303 defines a treatment, storage, or disposal (TSD) facility tank system as the ``dangerous waste storage or treatment tank and its ancillary equipment and containment.`` This integrity assessment evaluates the two tank systems at the facility: the evaporator vessel, C-A-1 (also called the vapor-liquid separator), and the condensate collection tank, TK-C-100. This IAR evaluates the 242-A facility tank systems up to, but not including, the last valve or flanged connection inside the facility perimeter. The initial integrity assessment performed on the facility evaluated certain subsystems not directly in contact with dangerous waste, such as the steam condensate and used raw water subsystems, to provide technical information. These subsystems were not evaluated in this IAR. The last major upgrade to the facility was project B-534. The facility modifications, as a result of project B-534, were evaluated in the 1993 facility interim integrity assessment. Since that time, the following upgrades have occurred in the facility: installation of a process condensate recycle system, and installation of a package steam boiler to provide steam for the facility. The package boiler is not within the scope of the facility TSD.

  1. An Aging Interventions Testing Program: study design and interim report.

    PubMed

    Miller, Richard A; Harrison, David E; Astle, Clinton M; Floyd, Robert A; Flurkey, Kevin; Hensley, Kenneth L; Javors, Martin A; Leeuwenburgh, Christiaan; Nelson, James F; Ongini, Ennio; Nadon, Nancy L; Warner, Huber R; Strong, Randy

    2007-08-01

    The National Institute on Aging's Interventions Testing Program (ITP) has developed a plan to evaluate agents that are considered plausible candidates for delaying rates of aging. Key features include: (i) use of genetically heterogeneous mice (a standardized four-way cross), (ii) replication at three test sites (the Jackson Laboratory, TJL; University of Michigan, UM; and University of Texas, UT), (iii) sufficient statistical power to detect 10% changes in lifespan, (iv) tests for age-dependent changes in T cell subsets and physical activity, and (v) an annual solicitation for collaborators who wish to suggest new interventions for evaluation. Mice in the first cohort were exposed to one of four agents: aspirin, nitroflurbiprofen (NFP), 4-OH-alpha-phenyl-N-tert-butyl nitrone (4-OH-PBN), or nordihydroguiaretic acid (NDGA). An interim analysis was conducted using survival data available on the date at which at least 50% of the male control mice had died at each test site. Survival of control males was significantly higher, at the interim time-point, at UM than at UT or TJL; all three sites had similar survival of control females. Males in the NDGA group had significantly improved survival (P = 0.0004), with significant effects noted at TJL (P < 0.01) and UT (P < 0.04). None of the other agents altered survival, although there was a suggestion (P = 0.07) of a beneficial effect of aspirin in males. More data will be needed to determine if any of these compounds can extend maximal lifespan, but the current data show that NDGA reduces early life mortality risks in genetically heterogeneous mice at multiple test sites.

  2. T Tank Farm Interim Cover Test - Design Plan

    SciTech Connect

    Zhang, Z. F.; Keller, Jason M.

    2006-07-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim cover on the surface. Such a cover is expected to prevent infiltrating water from reaching the plume and moving it further. Pacific Northwest National Laboratory has prepared a design plan to monitor and determine the effectiveness of the interim cover. A three-dimensional numerical simulation of water movement beneath a cover was conducted to guide the design of the plan. Soil water content, water pressure, and temperature will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests will be installed, one inside and one outside of the proposed cover. In fiscal year 2007, two additional instrument nests, both inside the proposed cover, will be installed. Each instrument nest contains a neutron access tube and a capacitance probe (to measure water content), and four heat-dissipation units (to measure pressure head and temperature). A datalogger and a meteorological station will be installed outside of the fence. Two drain gauges will be installed in locations inside and outside the cover for the purpose of measuring soil water flux.

  3. ICPP radioactive liquid and calcine waste technologies evaluation. Interim report

    SciTech Connect

    Murphy, J.A.; Pincock, L.F.; Christiansen, I.N.

    1994-06-01

    The Department of Energy (DOE) has received spent nuclear fuel (SNF) at the Idaho Chemical Processing Plant (ICPP) for interim storage since 1951 and reprocessing since 1953. Until recently, the major activity of the ICPP has been the reprocessing of SNF to recover fissile uranium; however, changing world events have raised questions concerning the need to recover and recycle this material. In April 1992, DOE chose to discontinue reprocessing SNF for uranium recovery and shifted its focus toward the management and disposition of radioactive wastes accumulated through reprocessing activities. Currently, 1.8 million gallons of radioactive liquid wastes (1.5 million gallons of radioactive sodium-bearing liquid wastes and 0.3 million gallons of high-level liquid waste) and 3,800 cubic meters (m{sup 3}) of calcine waste are in inventory at the ICPP. Legal drivers and agreements exist obligating the INEL to develop, demonstrate, and implement technologies for safe and environmentally sound treatment and interim storage of radioactive liquid and calcine waste. Candidate treatment processes and waste forms are being evaluated using the Technology Evaluation and Analysis Methodology (TEAM) Model. This process allows decision makers to (1) identify optimum radioactive waste treatment and disposal form alternatives; (2) assess tradeoffs between various optimization criteria; (3) identify uncertainties in performance parameters; and (4) focus development efforts on options that best satisfy stakeholder concerns. The Systems Analysis technology evaluation presented in this document supports the DOE in selecting the most effective radioactive liquid and calcine waste management plan to implement in compliance with established regulations, court orders, and agreements.

  4. Flammable gas deflagration consequence calculations for the tankwaste remediation system basis for interim operation

    SciTech Connect

    Van Vleet, R.J., Westinghouse Hanford

    1996-09-23

    This paper calculates the radiological dose consequences and the toxic exposures for deflagration accidents at various Tank Waste Remediation System facilities. These will be used in support of the Tank Waste Remediation System Basis for Interim Operation.

  5. Basis for Interim Operation for the K-Reactor in Cold Standby

    SciTech Connect

    Shedrow, B.

    1998-10-19

    The Basis for Interim Operation (BIO) document for K Reactor in Cold Standby and the L- and P-Reactor Disassembly Basins was prepared in accordance with the draft DOE standard for BIO preparation (dated October 26, 1993).

  6. Sample results from the interim salt disposition program macrobatch 9 tank 21H qualification samples

    SciTech Connect

    Peters, T. B.

    2015-11-01

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 9 for the Interim Salt Disposition Program (ISDP). This document reports characterization data on the samples of Tank 21H.

  7. LANDFILLS AS BIOREACTORS: RESEARH AT THE OUTER LOOP LANDFILL, LOUISVILLE, KENTUCKY; FIRST INTERIM REPORT

    EPA Science Inventory

    Interim report resulting from a cooperative research and development agreement (CRADA) between US EP A's Officeof Research and Development - National Risk Management Research Laboratory and a n ongoing field demonstration
    of municipal waste landfills being operated as bioreact...

  8. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No.... SUPPLEMENTARY INFORMATION: Reference: Military Freight Traffic Unified Rules Publications (MFTURP) No....

  9. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO.... SUPPLEMENTARY INFORMATION: References: Military Freight Traffic Unified Rules Publications (MFTURP) No....

  10. 75 FR 12217 - Notice of Availability for Comments Regarding the Planned Environmental Assessment Interim Report...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... reports. Interim Report IIIa, limited to the impacts of implementing additional in- stream barrier... determining the level of analysis and impacts to be considered for implementing these in- stream...

  11. DQO Summary Report for 105-N/109-N Interim Safe Storage Project Waste Characterization

    SciTech Connect

    T. A. Lee

    2005-09-15

    The DQO summary report provides the results of the DQO process completed for waste characterization activities for the 105-N/109-N Reactor Interim Safe Storage Project including decommission, deactivate, decontaminate, and demolish activities for six associated buildings.

  12. Treatment Technology to Meet the Interim Primary Drinking Water Regulations for Inorganics: Part 3.

    ERIC Educational Resources Information Center

    Sorg, Thomas J.; And Others

    1978-01-01

    This article is the third in a series summarizing existing treatment technology to meet the inorganic National Interim Primary Drinking Water Regulations. This report deals specifically with treatment methods for removing cadmium, lead, and silver from drinking water. (CS)

  13. Quantitative Framework for Retrospective Assessment of Interim Decisions in Clinical Trials

    PubMed Central

    Stanev, Roger

    2016-01-01

    This article presents a quantitative way of modeling the interim decisions of clinical trials. While statistical approaches tend to focus on the epistemic aspects of statistical monitoring rules, often overlooking ethical considerations, ethical approaches tend to neglect the key epistemic dimension. The proposal is a second-order decision-analytic framework. The framework provides means for retrospective assessment of interim decisions based on a clear and consistent set of criteria that combines both ethical and epistemic considerations. The framework is broadly Bayesian and addresses a fundamental question behind many concerns about clinical trials: What does it take for an interim decision (e.g., whether to stop the trial or continue) to be a good decision? Simulations illustrating the modeling of interim decisions counterfactually are provided. PMID:27353825

  14. Safety evaluation of interim stabilization of non-stabilized single-shell watch list tanks

    SciTech Connect

    Stahl, S.M.

    1994-12-30

    The report provides a summation of the status of safety issues associated with interim stabilization of Watch List SSTs (organic, ferrocyanide, and flammable gas), as extracted from recent safety analyses, including the Tank Farms Accelerated Safety Analysis efforts.

  15. Effect of Interim Annealing on Mechanical Strength of TFA-MOD Derived YBCO Coated Conductors

    NASA Astrophysics Data System (ADS)

    Takagi, Y.; Nakaoka, K.; Nakamura, T.; Yoshizumi, M.; Kiss, T.; Izumi, T.; Shiohara, Y.

    TFA-MOD derived YBCO tapes are expected for many applications due to cost-efficiency. In some applications, uniformity and mechanical strength are required for tapes. A 205 m-long YBCO tape was fabricated with high and uniform Ic performance throughout the tape by adopting the interim annealing before the conversion process. The effect of the interim annealing on the crystal growth mechanism of YBCO has been studied focusing on the relationship between the interim annealing conditions and delamination, in this work. Delamination strength was evaluated in the samples prepared with and without interim annealing by the stud pull method. Measurements were carried out on 50 different points for each sample and the results were analyzed statistically. The difference between the two samples was remarkably seen in the delamination strength below 60 MPa. The conventionally annealed sample had more points with low delamination strength below 60 MPa than the interim annealed one. The cross sectional images of both samples observed by SEM showed that there were few pores within the interim annealed superconducting layer, although conventional superconducting layer had many pores. These results suggest that the pores within YBCO layer might be origins to be propagated for delamination at low strength.

  16. Interim measure work plan/design for Agra, Kansas.

    SciTech Connect

    LaFreniere, L. M.; Environmental Science Division

    2008-11-18

    This Interim Measure Work Plan/Design (IMWP/D) is supplemental to the Argonne document Interim Measure Conceptual Design for Remediation of Source Area Contamination at Agra, Kansas. The IMWP/D includes information required by Kansas Department of Health and Environment (KDHE) Policy BER-RS-029, Policy and Scope of Work for Interim Measures. Specific to Policy BER-RS-029 is the requirement for several documents that will ensure that an adequate amount and type of data are collected for implementation of the IMWP/D and that data quality and safe conditions are prevailed. Such information is included in the IMWP/D as follows: Appendix A: Data Acquisition Plan--Design Testing Requirements; Appendix B: Basis of Design; Appendix C: Permits; Appendix D: Quality Assurance Project Plan; Appendix E: Health and Safety Plan; and Appendix F: Operations, Maintenance, and Monitoring Schedule. The proposed remedial technology for this project is the installation of five large-diameter boreholes (LDBs) in a source area that has been identified on the property formerly used for grain storage by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA). The goal of the LDB technology is the remediation of the source area by removal of mass quantities of contaminated soil from the vadose zone and treatment of any remaining contaminated soils that are adjacent to the source area to achieve a carbon tetrachloride concentration below 200 {micro}g/kg. Secondary to the soil remediation is the remediation of groundwater at and adjacent to the source areas. The LDB technology serves the following purposes: (1) The physical removal of contaminated soil from the identified source area. (2) Replacement of less permeable native materials (silty clay, clayey silt, and silty sand) with more permeable materials to facilitate the capture of volatilized contaminants in the vertical borehole. (3) Removal of contaminants volatilized by air sparging (AS) and extracted from the

  17. Finding of no significant impact. Consolidation and interim storage of special nuclear material at Rocky Flats Environmental Technology Site

    SciTech Connect

    1995-06-01

    The Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA -- 1060, for the consolidation, processing, and interim storage of Category I and II special nuclear material (SNM) in Building 371 at the Rocky Flats Environmental Technology Site (hereinafter referred to as Rocky Flats or Site), Golden, Colorado. The scope of the EA included alternatives for interim storage including the no action alternative, the construction of a new facility for interim storage at Rocky Flats, and shipment to other DOE facilities for interim storage.

  18. Database and Interim Glass Property Models for Hanford HLW Glasses

    SciTech Connect

    Hrma, Pavel R.; Piepel, Gregory F.; Vienna, John D.; Cooley, Scott K.; Kim, Dong-Sang; Russell, Renee L.

    2001-07-24

    The purpose of this report is to provide a methodology for an increase in the efficiency and a decrease in the cost of vitrifying high-level waste (HLW) by optimizing HLW glass formulation. This methodology consists in collecting and generating a database of glass properties that determine HLW glass processability and acceptability and relating these properties to glass composition. The report explains how the property-composition models are developed, fitted to data, used for glass formulation optimization, and continuously updated in response to changes in HLW composition estimates and changes in glass processing technology. Further, the report reviews the glass property-composition literature data and presents their preliminary critical evaluation and screening. Finally the report provides interim property-composition models for melt viscosity, for liquidus temperature (with spinel and zircon primary crystalline phases), and for the product consistency test normalized releases of B, Na, and Li. Models were fitted to a subset of the screened database deemed most relevant for the current HLW composition region.

  19. Honeywell Cascade Distiller System Performance Testing Interim Results

    NASA Technical Reports Server (NTRS)

    Callahan, Michael R.; Sargusingh, Miriam

    2014-01-01

    The ability to recover and purify water through physiochemical processes is crucial for realizing long-term human space missions, including both planetary habitation and space travel. Because of their robust nature, distillation systems have been actively pursued as one of the technologies for water recovery. The Cascade Distillation System (CDS) is a vacuum rotary distillation system with potential for greater reliability and lower energy costs than existing distillation systems. The CDS was previously under development through Honeywell and NASA. In 2009, an assessment was performed to collect data to support down-selection and development of a primary distillation technology for application in a lunar outpost water recovery system. Based on the results of this testing, an expert panel concluded that the CDS showed adequate development maturity, TRL-4, together with the best product water quality and competitive weight and power estimates to warrant further development. The Advanced Exploration Systems (AES) Water Recovery Project (WRP) worked to address weaknesses identified by The Panel; namely bearing design and heat pump power efficiency. Testing at the NASA-JSC Advanced Exploration System Water Laboratory (AES Water Lab) using a prototype Cascade Distillation Subsystem (CDS) wastewater processor (Honeywell International, Torrance, Calif.) with test support equipment and control system developed by Johnson Space Center was performed to evaluate performance of the system with the upgrades. The CDS will also have been challenged with ISS analog waste streams and a subset of those being considered for Exploration architectures. This paper details interim results of the AES WRP CDS performance testing.

  20. Extreme Heat Stress trends in ERA Interim 1979-2011

    NASA Astrophysics Data System (ADS)

    Buzan, J. R.; Huber, M.

    2012-12-01

    Heat stress is a function of temperature and humidity, and is therefore subject to the covariance of the two quantities. One of the robust predictions from climate change is an increase in temperatures across the planet, and therefore heat stress is projected to increase, however the covariance with humidity is less sure. It has been proposed that in future climate, significant portions of the land surface become subject to life threatening heat stress levels to humans and mammals. There are numerous methods and metrics for calculating heat stress, however, the majority use atmospheric state variables (pressure, temperature, and specific humidity), to measure the thermodynamic state of the atmosphere or estimate thermal load on humans and mammals. Here we present calculations of the evolution of heat stress for the past 3 decades using the European Centre for Medium-Range Weather Forecasts (ECMWF) ERA Interim reanalysis data product from near surface boundary layer state variables. We characterize both spatial and temporal trends with a variety of the most commonly used heat stress metrics (wet bulb temperatures, heat index, etc.). The metrics are calculated from 4x daily values to capture both the diurnal cycle and the daily peak values for these indices.

  1. Safe Advantage on Dry Interim Spent Nuclear Fuel Storage

    SciTech Connect

    Romanato, L.S.

    2008-07-01

    This paper aims to present the advantages of dry cask storage in comparison with the wet storage (cooling water pools) for SNF. When the nuclear fuel is removed from the core reactor, it is moved to a storage unit and it wait for a final destination. Generally, the spent nuclear fuel (SNF) remains inside water pools within the reactors facility for the radioactive activity decay. After some period of time in pools, SNF can be sent to a definitive deposition in a geological repository and handled as radioactive waste or to reprocessing facilities, or still, wait for a future solution. Meanwhile, SNF remains stored for a period of time in dry or wet facilities, depending on the method adopted by the nuclear power plant or other plans of the country. Interim storage, up to 20 years ago, was exclusively wet and if the nuclear facility had to be decommissioned another storage solution had to be found. At the present time, after a preliminary cooling of the SNF elements inside the water pool, the elements can be stored in dry facilities. This kind of storage does not need complex radiation monitoring and it is safer then wet one. Casks, either concrete or metallic, are safer, especially on occurrence of earthquakes, like that occurred at Kashiwazaki-Kariwa nuclear power plant, in Japan on July 16, 2007. (authors)

  2. Eos Interviews Robert Van Hook, Former AGU Interim Executive Director

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2010-08-01

    Robert Van Hook, who served as AGU's interim executive director since January 2009, led the organization during a transition period that began with the retirement of long-serving executive director A. F. (“Fred”) Spilhaus Jr. Van Hook's tenure concluded on 30 August when Christine McEntee assumed her position as AGU's new executive director (see Eos, 91(17), 153, 156, 2010). During his tenure at AGU, which overlapped with a global economic recession, Van Hook helped to guide the organization through key structural governance changes, strategic planning, and upgrades in technology, human resources, and accounting. He also helped to revitalize public outreach and member services, among many other efforts. Van Hook, president of Transition Management Consulting, recently reflected upon his tenure, the transition period, and the future of AGU. Van Hook credits AGU's strong volunteer leadership—including past presidents Tim Killeen and Tim Grove, current president Mike McPhaden, and president-elect Carol Finn—for courage in moving the organization through a successful transition. “They were the ones who shoved the boat off from the shore. I was lucky enough to be invited into the boat,” he said. He also credits the staff for their resiliency and commitment to supporting AGU's science.

  3. Kennedy Space Center Press Site (SWMU 074) Interim Measure Report

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2015-01-01

    This report summarizes the Interim Measure (IM) activities conducted at the Kennedy Space Center (KSC) Press Site ("the Press Site"). This facility has been designated as Solid Waste Management Unit 074 under KSC's Resource Conservation and Recovery Act Corrective Action program. The activities were completed as part of the Vehicle Assembly Building (VAB) Area Land Use Controls Implementation Plan (LUCIP) Elimination Project. The purpose of the VAB Area LUCIP Elimination Project was to delineate and remove soil affected with constituents of concern (COCs) that historically resulted in Land Use Controls (LUCs). The goal of the project was to eliminate the LUCs on soil. LUCs for groundwater were not addressed as part of the project and are not discussed in this report. This report is intended to meet the Florida Department of Environmental Protection (FDEP) Corrective Action Management Plan requirement as part of the KSC Hazardous and Solid Waste Amendments permit and the U.S. Environmental Protection Agency's (USEPA's) Toxic Substance Control Act (TSCA) self-implementing polychlorinated biphenyl (PCB) cleanup requirements of 40 Code of Federal Regulations (CFR) 761.61(a).

  4. DOUBLE TRACKS Test Site interim corrective action plan

    SciTech Connect

    1996-06-01

    The DOUBLE TRACKS site is located on Range 71 north of the Nellis Air Force Range, northwest of the Nevada Test Site (NTS). DOUBLE TRACKS was the first of four experiments that constituted Operation ROLLER COASTER. On May 15, 1963, weapons-grade plutonium and depleted uranium were dispersed using 54 kilograms of trinitrotoluene (TNT) explosive. The explosion occurred in the open, 0.3 m above the steel plate. No fission yield was detected from the test, and the total amount of plutonium deposited on the ground surface was estimated to be between 980 and 1,600 grams. The test device was composed primarily of uranium-238 and plutonium-239. The mass ratio of uranium to plutonium was 4.35. The objective of the corrective action is to reduce the potential risk to human health and the environment and to demonstrate technically viable and cost-effective excavation, transportation, and disposal. To achieve these objectives, Bechtel Nevada (BN) will remove soil with a total transuranic activity greater then 200 pCI/g, containerize the soil in ``supersacks,`` transport the filled ``supersacks`` to the NTS, and dispose of them in the Area 3 Radioactive Waste Management Site. During this interim corrective action, BN will also conduct a limited demonstration of an alternative method for excavation of radioactive near-surface soil contamination.

  5. Peer Review of the Waste Package Material Performance Interim Report

    SciTech Connect

    J. A. Beavers; T. M. Devine, Jr.; G. S. Frankel; R. H. Jones; R. G. Kelly; R. M. Latanision; J. H. Payer

    2001-09-04

    At the request of the U.S. Department of Energy, Bechtel SAIC Company, LLC, formed the Waste Package Materials Performance Peer Review Panel (the Panel) to review the technical basis for evaluating the long-term performance of waste package materials in a proposed repository at Yucca Mountain, Nevada. This is the interim report of the Panel; a final report will be issued in February 2002. In its work to date, the Panel has identified important issues regarding waste package materials performance. In the remainder of its work, the Panel will address approaches and plans to resolve these issues. In its review to date, the Panel has not found a technical basis to conclude that the waste package materials are unsuitable for long-term containment at the proposed Yucca Mountain Repository. Nevertheless, significant technical issues remain unsettled and, primarily because of the extremely long life required for the waste packages, there will always be some uncertainty in the assessment. A significant base of scientific and engineering knowledge for assessing materials performance does exist and, therefore, the likelihood is great that uncertainty about the long-term performance can be substantially reduced through further experiments and analysis.

  6. Interim performance criteria for photovoltaic energy systems. [Glossary included

    SciTech Connect

    DeBlasio, R.; Forman, S.; Hogan, S.; Nuss, G.; Post, H.; Ross, R.; Schafft, H.

    1980-12-01

    This document is a response to the Photovoltaic Research, Development, and Demonstration Act of 1978 (P.L. 95-590) which required the generation of performance criteria for photovoltaic energy systems. Since the document is evolutionary and will be updated, the term interim is used. More than 50 experts in the photovoltaic field have contributed in the writing and review of the 179 performance criteria listed in this document. The performance criteria address characteristics of present-day photovoltaic systems that are of interest to manufacturers, government agencies, purchasers, and all others interested in various aspects of photovoltaic system performance and safety. The performance criteria apply to the system as a whole and to its possible subsystems: array, power conditioning, monitor and control, storage, cabling, and power distribution. They are further categorized according to the following performance attributes: electrical, thermal, mechanical/structural, safety, durability/reliability, installation/operation/maintenance, and building/site. Each criterion contains a statement of expected performance (nonprescriptive), a method of evaluation, and a commentary with further information or justification. Over 50 references for background information are also given. A glossary with definitions relevant to photovoltaic systems and a section on test methods are presented in the appendices. Twenty test methods are included to measure performance characteristics of the subsystem elements. These test methods and other parts of the document will be expanded or revised as future experience and needs dictate.

  7. High-temperature flaw assessment procedure: Interim report

    SciTech Connect

    Ruggles, M.B.; Takahashi, Y.; Ainsworth, R.A.

    1989-08-01

    The current program represents a joint effort between the Electric Power Research Institute (EPRI) in the USA, the Central Research Institute of Electric Power Industry (CRIEPI) in Japan, and the Central Electricity Generating Board (CEGB) in the UK. The goal is to develop an interim high-temperature flaw assessment procedure for high-temperature reactor components. This is to be accomplished through exploratory experimental and analytical studies of high-temperature crack growth. The state-of-the-art assessment and the fracture mechanics database for both types 304 and 316 stainless steels, completed in 1988, serve as a foundation for the present work. Work in the three participating organizations is progressing roughly on schedule. Results to-date are presented in this document. Fundamental tests results are discussed in Section 2. Section 3 focuses on results of exploratory subcritical crack growth tests. Progress in subcritical crack growth modeling is reported in Section 4. Exploratory failure tests are outlined in Section 5. 21 refs., 70 figs., 7 tabs.

  8. Maywood Interim Storage Site annual environmental report for calendar year 1991, Maywood, New Jersey. [Maywood Interim Storage Site

    SciTech Connect

    1992-09-01

    This document describes the environmental monitoring program at the Maywood Interim Storage Site (MISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of MISS began in 1984 when congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to identify and decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. The environmental monitoring program at MISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation-exposure; and total uranium, radium-226, radium-228, thorium-232, and thorium-230 concentrations in surface water, sediment, and groundwater. Additionally, several nonradiological parameters are measured in surface water, sediment, and groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides (DCGs), dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  9. Wayne Interim Storage Site annual environmental report for calendar year 1991, Wayne, New Jersey. [Wayne Interim Storage Site

    SciTech Connect

    1992-09-01

    This document describes the envirormental monitoring program at the Wayne Interim Storage Site (WISS) and surrounding area, implementation of the program, and monitoring results for 1991. Environmental monitoring of WISS and surrounding area began in 1984 when Congress added the site to the US Department of Energy's (DOE) Formerly Utilized Sites Remedial Action Program (FUSRAP). FUSRAP is a DOE program to decontaminate or otherwise control sites where residual radioactive materials remain from the early years of the nation's atomic energy program or from commercial operations causing conditions that Congress has authorized DOE to remedy. WISS is a National Priorities List site. The environmental monitoring program at WISS includes sampling networks for radon and thoron concentrations in air; external gamma radiation exposure; and radium-226, radium-228, thorium-232, and total uranium concentrations in surface water, sediment, and groundwater. Several nonradiological parameters are also measured in groundwater. Monitoring results are compared with applicable Environmental Protection Agency standards, DOE derived concentration guides, dose limits, and other requirements in DOE orders. Environmental standards are established to protect public health and the environment.

  10. Commentary: Interim leadership of academic departments at U.S. medical schools.

    PubMed

    Grigsby, R Kevin; Aber, Robert C; Quillen, David A

    2009-10-01

    Medical schools and teaching hospitals are experiencing more frequent turnover of department chairs. Loss of a department chair creates instability in the department and may have a negative effect on the organization at large. Interim leadership of academic departments is common, and interim chairs are expected to immediately demonstrate skills and leadership abilities. However, little is known about how persons are prepared to assume the interim chair role. Newer competencies for effective leadership include an understanding of the business of medicine, interpersonal and communication skills, the ability to deal with conflict and solve adaptive challenges, and the ability to build and work on teams. Medical schools and teaching hospitals need assistance to meet the unique training and support needs of persons serving as interim leaders. For example, the Association of American Medical Colleges and individual chair societies can develop programs to allow current chairs to reflect on their present positions and plan for the future. Formal leadership training, mentorship opportunities, and conscientious succession planning are good first steps in preparing to meet the needs of academic departments during transitions in leadership. Also, interim leadership experience may be useful as a means for "opening the door" to underrepresented persons, including women, and increasing the diversity of the leadership team.

  11. Wide-Field Infrared Survey Telescope (WFIRST) Interim Report

    NASA Technical Reports Server (NTRS)

    Green, J.; Schechter, P.; Baltay, C.; Bean, R.; Bennett, D.; Brown, R.; Conselice, C.; Donahue, M.; Gaudi, S.; Lauer, T.; Perlmutter, S.; Rauscher, B.; Rhodes, J.; Roellig, T.; Stern, D.; Sumi, T.; Gerhels, N.; Sambruna, R.; Barry, R. K.; Content, D.; Grady, K; Jackson, C.; Kruk, J.; Melton, M.; Rioux, N.

    2011-01-01

    measurements. The Infrared Astronomical Satellite (IRAS), the Cosmic Background Explorer (COBE), Herschel, Spitzer, and Wide-field Infrared Sur-vey Explorer (WISE) are all space missions that have produced stunning new scientific advances by going to space to observe in the infrared. This interim report describes progress as of June 2011 on developing a requirements flowdown and an evaluation of scientific performance. An Interim Design Reference Mission (IDRM) configuration is presented that is based on the specifications of NWNH with some refinements to optimize the design in accordance with the new scientific requirements. Analysis of this WFIRST IDRM concept is in progress to ensure the capability of the observatory is compatible with the science requirements. The SDT and Project will continue to refine the mission concept over the coming year as design, analysis and simulation work are completed, resulting in the SDT s WFIRST Design Reference Mission (DRM) by the end of 2012.

  12. 4D Dynamic RNP Annual Interim Report-Year 1

    NASA Technical Reports Server (NTRS)

    Finkelsztein, Daniel M.; Sturdy, James L.; Alaverdi, Omeed; Chung, William W.; Salvano, Daniel; Klooster, Joel; Hochwarth, Joachim K.

    2010-01-01

    This Annual Interim Report summarizes the activities led by Raytheon, in collaboration with GE Aviation and SAIC, and presents the results obtained during the first year of this research effort to expand the RNP concept to 4 dimensions relative to a dynamic frame of reference. Joint Program Development Office (JPDO)Concepts of Operations for the Next Generation Air Transportation System (NextGen) considers 4 Dimension Trajectory (4DT) procedures a key enabler to Trajectory Based Operations (TBO). The JPDO defines 4DT as a precise description of an aircraft path in space and time . While NextGen assumes that this path is defined within an Earth-reference frame, many 4DT procedure implementations will require an aircraft to precisely navigate relative to a moving reference such as another aircraft to form aggregate flows or a weather cell to allow for flows to shift. Current methods of implementing routes and flight paths rely on aircraft meeting a Required Navigation Performance (RNP) specification and being equipped with a monitoring and alerting capability to annunciate when the aircraft system is unable to meet the performance specification required for the operation. Since all aircraft today operate within the NAS relative to fixed reference points, the current RNP definition is deemed satisfactory. However, it is not well understood how the current RNP construct will support NextGen 4DT procedures where aircraft operate relative to each other or to other dynamic frames of reference. The objective of this research effort is to analyze candidate 4DT procedures from both an Air Navigation Service Provider (ANSP) and aircraft perspective, to identify their specific navigational requirements, assess the shortcomings of the current RNP construct to meet these requirements, to propose an extended 4 Dimensional Dynamic RNP (4D Dynamic RNP) construct that accounts for the dynamic spatial and temporal nature of the selected 4DT procedures, and finally, to design an

  13. High Temperature Materials Interim Data Qualification Report FY 2011

    SciTech Connect

    Nancy Lybeck

    2011-08-01

    Projects for the very high temperature reactor (VHTR) Technology Development Office provide data in support of Nuclear Regulatory Commission licensing of the VHTR. Fuel and materials to be used in the reactor are tested and characterized to quantify performance in high temperature and high fluence environments. The VHTR program has established the Next Generation Nuclear Plant (NGNP) Data Management and Analysis System (NDMAS) to ensure that VHTR data are qualified for use, stored in a readily accessible electronic form, and analyzed to extract useful results. This document focuses on the first NDMAS objective. It describes the High Temperature Materials characterization data stream, the processing of these data within NDMAS, and reports the interim fiscal year (FY) 2011 qualification status of the data. Data qualification activities within NDMAS for specific types of data are determined by the data qualification category assigned by the data generator. The High Temperature Materials data are being collected under the Nuclear Quality Assurance (NQA)-1 guidelines and will be qualified data. For NQA-1 qualified data, the qualification activities include: (1) capture testing to confirm that the data stored within NDMAS are identical to the raw data supplied, (2) accuracy testing to confirm that the data are an accurate representation of the system or object being measured, and (3) documenting that the data were collected under an NQA-1 or equivalent Quality Assurance program. Currently, data from seven test series within the High Temperature Materials data stream have been entered into the NDMAS vault, including tensile tests, creep tests, and cyclic tests. Of the 5,603,682 records currently in the vault, 4,480,444 have been capture passed, and capture testing is in process for the remaining 1,123,238.

  14. FIRST INTERIM STATUS REPORT MODEL 9975 LIFE EXTENSION PACKAGE TESTING

    SciTech Connect

    Daugherty, W.; Stefek, T.

    2010-01-27

    Three 9975 packages have been instrumented and exposed to bounding storage conditions to help identify the extent to which laboratory test results for fiberboard, O-rings and other components apply within a full-scale package. To date, changes observed in the fiberboard overpack and O-ring seals are generally consistent with the behavior of laboratory samples. The lead shield within each package has developed a corrosion layer of lead carbonate, consistent with other 9975 packages. However, the morphology of the corrosion layer is different within these packages, possibly as a result of the severity of the conditioning environments beyond normal service conditions. Conditioning of the second package, LE2, has been discontinued due to the degree of degradation of the fiberboard, and its components have received a final examination. Additional testing will be performed on samples removed from the fiberboard assembly to verify its final condition. The other two packages will continue in test. This is an interim status report for experiments carried out per Task Technical Plan WSRC-TR-2005-00014 [1], which is part of the comprehensive 9975 package surveillance program [2]. The primary goal of this task is to validate aging models currently under development based on lab scale testing of the fiberboard overpack and containment vessel O-rings. A secondary goal is to examine the behavior of the lead shielding under bounding conditions. This task provides an integrated assessment of the package response to environmental extremes, and demonstrates the extent to which data from small samples scale up to a full package. Three 9975 packages have been modified to provide instrumentation for monitoring package response and performance to environmental aging. Each package has a different environmental exposure history.

  15. Idaho Waste Vitrification Facilities Project Vitrified Waste Interim Storage Facility

    SciTech Connect

    Bonnema, Bruce Edward

    2001-09-01

    This feasibility study report presents a draft design of the Vitrified Waste Interim Storage Facility (VWISF), which is one of three subprojects of the Idaho Waste Vitrification Facilities (IWVF) project. The primary goal of the IWVF project is to design and construct a treatment process system that will vitrify the sodium-bearing waste (SBW) to a final waste form. The project will consist of three subprojects that include the Waste Collection Tanks Facility, the Waste Vitrification Facility (WVF), and the VWISF. The Waste Collection Tanks Facility will provide for waste collection, feed mixing, and surge storage for SBW and newly generated liquid waste from ongoing operations at the Idaho Nuclear Technology and Engineering Center. The WVF will contain the vitrification process that will mix the waste with glass-forming chemicals or frit and turn the waste into glass. The VWISF will provide a shielded storage facility for the glass until the waste can be disposed at either the Waste Isolation Pilot Plant as mixed transuranic waste or at the future national geological repository as high-level waste glass, pending the outcome of a Waste Incidental to Reprocessing determination, which is currently in progress. A secondary goal is to provide a facility that can be easily modified later to accommodate storage of the vitrified high-level waste calcine. The objective of this study was to determine the feasibility of the VWISF, which would be constructed in compliance with applicable federal, state, and local laws. This project supports the Department of Energy’s Environmental Management missions of safely storing and treating radioactive wastes as well as meeting Federal Facility Compliance commitments made to the State of Idaho.

  16. FIRST INTERIM STATUS REPORT: MODEL 9975 LIFE EXTENSION PACKAGE TESTING

    SciTech Connect

    Daugherty, W.; Stefek, T.

    2009-12-29

    Three 9975 packages have been instrumented and exposed to bounding storage conditions to help identify the extent to which laboratory test results for fiberboard, O-rings and other components apply within a full-scale package. To date, changes observed in the fiberboard overpack and Oring seals are generally consistent with the behavior of laboratory samples. The lead shield within each package has developed a corrosion layer of lead carbonate, consistent with other 9975 packages. However, the morphology of the corrosion layer is different within these packages, possibly as a result of the severity of the conditioning environments beyond normal service conditions. Conditioning of the second package, LE2, has been discontinued due to the degree of degradation of the fiberboard, and its components have received a final examination. Additional testing will be performed on samples removed from the fiberboard assembly to verify its final condition. The other two packages will continue in test. This is an interim status report for experiments carried out per Task Technical Plan WSRC-TR-2005-00014 [1], which is part of the comprehensive 9975 package surveillance program [2]. The primary goal of this task is to validate aging models currently under development based on lab scale testing of the fiberboard overpack and containment vessel O-rings. A secondary goal is to examine the behavior of the lead shielding under bounding conditions. This task provides an integrated assessment of the package response to environmental extremes, and demonstrates the extent to which data from small samples scale up to a full package. Three 9975 packages have been modified to provide instrumentation for monitoring package response and performance to environmental aging. Each package has a different environmental exposure history.

  17. Identification of sting jet extratropical cyclones in ERA-Interim

    NASA Astrophysics Data System (ADS)

    Martinez-Alvarado, Oscar; Gray, Suzanne

    2010-05-01

    Sting jets are transient, highly localized low-level jets that descend from the tip of the cloud head towards the top of the boundary layer in some rapidly deepening Shapiro-Keyser type extratropical cyclones. Sting jets have recently been recognised as clearly different from other air streams, such as the warm and cold conveyor belts, that are also part of the structure of these cyclones. Understanding the dynamics and statistics of sting jets is important due to the potential loss of life and damage to property and infrastructure that can occur as a consequence of the strong winds that sting jets can generate if their momentum is transferred to the surface. However, with very few documented cases, their frequency of occurrence and intensity range are still open questions. One way of tackling this problem is to study available reanalysis datasets. However, these datasets are not expected to explicitly show the occurrence of sting jets due to their coarse resolution. Instead of a direct search for sting jets, a search for sting jet precursors such as regions of high conditional symmetric instability (CSI) at mid-tropospheric levels is proposed in this study. For this purpose, a method based on an appropriate set of diagnostics has been devised to identify regions of CSI potentially associated with sting jets in gridded atmospheric datasets at resolutions including the coarse resolution of currently available reanalyses. The method is tested on some of the well-documented case studies of sting jets. Once its reliability is proven, it is applied to the 50 most intense cyclones in the North Atlantic during the first 10 years (from 1989 to 1998) of the ECMWF reanalysis ERA-Interim. Around 10% of these cases are found to potentially have sting jets. These results represent a further step towards the construction of the first climatology of sting jets.

  18. 75 FR 5632 - Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-03

    ... emergency alternating current power system. This ISG document provides guidance on the implementation of... EGTG systems that are air cooled and diesel oil fueled are considered in this interim guidance. DATES... COMMISSION Office of New Reactors; Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

  19. 75 FR 53724 - Notice of Availability and Opportunity for Comment on Draft Division of Safety Systems Interim...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-01

    ... Systems Interim Staff Guidance, (DSS-ISG) DSS-ISG-2010-01, ``Staff Guidance Regarding the Nuclear... COMMISSION Notice of Availability and Opportunity for Comment on Draft Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding the Nuclear Criticality Safety Analysis...

  20. 76 FR 63676 - Final Division of Safety Systems Interim Staff Guidance DSS-ISG-2010-01: Staff Guidance Regarding...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... COMMISSION Final Division of Safety Systems Interim Staff Guidance DSS-ISG- 2010-01: Staff Guidance Regarding... final Division of Safety Systems Interim Staff Guidance, (DSS-ISG) DSS- ISG-2010-01, ``Staff Guidance... guidance to the NRC staff reviewer to address the increased complexity of recent spent fuel pool...

  1. 75 FR 16202 - Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... COMMISSION Office of New Reactors; Interim Staff Guidance on Ensuring Hazard-Consistent Seismic Input for...). ACTION: Notice of availability. SUMMARY: The NRC staff is issuing its Final Interim Staff Guidance (ISG... Interaction Analyses,'' (Agencywide Documents Access and Management System (ADAMS) Accession No....

  2. 76 FR 35922 - Interim Staff Guidance Regarding the Environmental Report for Applications To Construct and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... COMMISSION Interim Staff Guidance Regarding the Environmental Report for Applications To Construct and/or... guidance; request for public comment. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) staff is requesting public comment on a proposed draft Interim Staff Guidance (ISG), NPR-ISG-2011-001,...

  3. 76 FR 17160 - Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-28

    ... COMMISSION Office of New Reactors; Final Interim Staff Guidance on the Review of Nuclear Power Plant Designs Using a Gas Turbine Driven Standby Emergency Alternating Current Power System AGENCY: Nuclear Regulatory... Guidance (ISG) DC/COL-ISG-021 titled ``Interim Staff Guidance on the Review of Nuclear Power Plant...

  4. 75 FR 5356 - Office of New Reactors; Final Interim Staff Guidance on Post-Combined License Commitments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ... Interim Staff Guidance (ISG) ESP/ DC/COL-ISG-015 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML093561416). This ISG supplements the guidance provided to the NRC staff in Section 1.0... COMMISSION Office of New Reactors; Final Interim Staff Guidance on Post- Combined License Commitments...

  5. 75 FR 8412 - Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... Interim Staff Guidance (ISG) DC/COL-ISG-014 (Agencywide Documents Access and Management System (ADAMS... COMMISSION Office of New Reactors: Interim Staff Guidance on Assessing Ground Water Flow and Transport of... Certification (DC) applicants additional clarity and guidance for the application of Sections 2.4.12 and...

  6. 49 CFR 228.409 - Requirements for railroad-provided employee sleeping quarters during interim releases and other...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... sleeping quarters during interim releases and other periods available for rest within a duty tour. 228.409... Requirements for railroad-provided employee sleeping quarters during interim releases and other periods available for rest within a duty tour. (a) If a railroad subject to this subpart provides sleeping...

  7. 37 CFR 1.760 - Interim extension of patent term under 35 U.S.C. 156(e)(2).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... extension in compliance with § 1.740 may request one or more interim extensions for periods of up to one... be filed at least three months prior to the expiration date of the patent. The Director may issue interim extensions, without a request by the applicant, for periods of up to one year each until a...

  8. 75 FR 41726 - Interim Final Rules for Group Health Plans and Health Insurance Issuers Relating to Coverage of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... information from the Department of Labor concerning employment-based health coverage laws may call the EBSA... April 14, 2010 (75 FR 19297). The second phase was interim final regulations implementing PHS Act... May 13, 2010 (75 FR 27122). The third phase was interim final regulations implementing section 1251...

  9. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  10. 77 FR 23222 - Foreign-Trade Zone 59, Temporary/Interim Manufacturing Authority, Novartis Consumer Health, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Foreign-Trade Zones Board Foreign-Trade Zone 59, Temporary/Interim Manufacturing Authority, Novartis Consumer Health, Inc., (Pharmaceutical Product Manufacturing); Notice of Approval On January 12, 2012, the... Foreign Trade Zone, Inc., grantee of FTZ 59, requesting temporary/interim manufacturing (T/IM)...

  11. 76 FR 9743 - Foreign-Trade Zone Subzone 22- Chicago, IL, Temporary/Interim Manufacturing Authority, Baxter...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... Foreign-Trade Zones Board Foreign-Trade Zone Subzone 22-- Chicago, IL, Temporary/Interim Manufacturing Authority, Baxter Healthcare Corporation (Pharmaceutical and Biological Product Manufacturing), Notice of.../ interim manufacturing (T/IM) authority, on behalf of Baxter Healthcare Corporation (Baxter) to...

  12. 76 FR 50172 - Foreign-Trade Zone 26, Temporary/Interim Manufacturing Authority, Makita Corporation of America...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... Foreign-Trade Zones Board Foreign-Trade Zone 26, Temporary/Interim Manufacturing Authority, Makita Corporation of America, Hand-Held Power Tool and Gasoline/ Electric-Powered Garden Product Manufacturing... temporary/interim manufacturing (T/IM) authority, on behalf of Makita Corporation of America, to...

  13. 75 FR 2557 - Interim Policy for the Sharing of Information Collected by the Coast Guard Nationwide Automatic...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-15

    ... SECURITY Coast Guard Interim Policy for the Sharing of Information Collected by the Coast Guard Nationwide Automatic Identification System AGENCY: Coast Guard, DHS. ACTION: Notice of policy and request for comments. SUMMARY: The Coast Guard has developed an interim policy for the access and sharing of...

  14. 49 CFR 37.169 - Interim requirements for over-the-road bus service operated by private entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Interim requirements for over-the-road bus service... Interim requirements for over-the-road bus service operated by private entities. Link to an amendment published at 76 FR 57936, September 19, 2011. (a) Private entities operating over-the-road buses,...

  15. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for...-kindergarten Programs § 39.1100 Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten... part from Bureau education funds in fiscal year 1979 shall be funded from Bureau education funds by...

  16. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Establishment of an interim fiscal year 1980 operation... Maintenance Fund § 39.1201 Establishment of an interim fiscal year 1980 operation and maintenance fund for... amount of $2.5 million, under the fiscal year 1980 appropriation for the Bureau, from budget...

  17. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Interim fiscal year 1980 and fiscal year 1981 funding for...-kindergarten Programs § 39.1100 Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten... part from Bureau education funds in fiscal year 1979 shall be funded from Bureau education funds by...

  18. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for...-kindergarten Programs § 39.1100 Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten... part from Bureau education funds in fiscal year 1979 shall be funded from Bureau education funds by...

  19. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation... Maintenance Fund § 39.1201 Establishment of an interim fiscal year 1980 operation and maintenance fund for... amount of $2.5 million, under the fiscal year 1980 appropriation for the Bureau, from budget...

  20. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and... Maintenance Fund § 39.1201 Establishment of an interim fiscal year 1980 operation and maintenance fund for... amount of $2.5 million, under the fiscal year 1980 appropriation for the Bureau, from budget...

  1. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation... Maintenance Fund § 39.1201 Establishment of an interim fiscal year 1980 operation and maintenance fund for... amount of $2.5 million, under the fiscal year 1980 appropriation for the Bureau, from budget...

  2. 25 CFR 39.1100 - Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten programs previously...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Interim fiscal year 1980 and fiscal year 1981 funding for...-kindergarten Programs § 39.1100 Interim fiscal year 1980 and fiscal year 1981 funding for pre-kindergarten... part from Bureau education funds in fiscal year 1979 shall be funded from Bureau education funds by...

  3. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation... Maintenance Fund § 39.1201 Establishment of an interim fiscal year 1980 operation and maintenance fund for... amount of $2.5 million, under the fiscal year 1980 appropriation for the Bureau, from budget...

  4. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... unwanted material that is transferred from the laboratory(ies) to an on-site interim status or permitted treatment, storage or disposal facility. (b) All unwanted material removed from the laboratory(ies) must be taken directly from the laboratory(ies) to the on-site interim status or permitted treatment, storage...

  5. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... unwanted material that is transferred from the laboratory(ies) to an on-site interim status or permitted treatment, storage or disposal facility. (b) All unwanted material removed from the laboratory(ies) must be taken directly from the laboratory(ies) to the on-site interim status or permitted treatment, storage...

  6. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... unwanted material that is transferred from the laboratory(ies) to an on-site interim status or permitted treatment, storage or disposal facility. (b) All unwanted material removed from the laboratory(ies) must be taken directly from the laboratory(ies) to the on-site interim status or permitted treatment, storage...

  7. 40 CFR 262.212 - Making the hazardous waste determination at an on-site interim status or permitted treatment...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... unwanted material that is transferred from the laboratory(ies) to an on-site interim status or permitted treatment, storage or disposal facility. (b) All unwanted material removed from the laboratory(ies) must be taken directly from the laboratory(ies) to the on-site interim status or permitted treatment, storage...

  8. 75 FR 26981 - Notice of Establishment of Interim Final Supplementary Rules for Public Lands Managed by the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... California in order to protect human health, safety, and the environment. Clarity of the Interim Final..., protect natural and cultural resources, improve recreational opportunities, and protect public health. All... rules on an interim final basis, effective on the date of publication because of public health...

  9. 40 CFR 257.3-5 - Application to land used for the production of food-chain crops (interim final).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... production of food-chain crops (interim final). 257.3-5 Section 257.3-5 Protection of Environment... Application to land used for the production of food-chain crops (interim final). (a) Cadmium. A facility or... for the production of food-chain crops shall not exist or occur, unless in compliance with...

  10. 40 CFR 257.3-5 - Application to land used for the production of food-chain crops (interim final).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... production of food-chain crops (interim final). 257.3-5 Section 257.3-5 Protection of Environment... Application to land used for the production of food-chain crops (interim final). (a) Cadmium. A facility or... for the production of food-chain crops shall not exist or occur, unless in compliance with...

  11. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 1 2012-07-01 2012-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  12. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 1 2013-07-01 2013-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  13. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 1 2014-07-01 2014-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  14. 33 CFR 96.350 - Interim Document of Compliance certificate: what is it and when can it be used?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 1 2011-07-01 2011-07-01 false Interim Document of Compliance certificate: what is it and when can it be used? 96.350 Section 96.350 Navigation and Navigable Waters COAST...? § 96.350 Interim Document of Compliance certificate: what is it and when can it be used? (a) An...

  15. Environmental assessment for 881 Hillside (High Priority Sites) interim remedial action

    SciTech Connect

    Not Available

    1990-01-01

    This Environmental Assessment evaluates the impact of an interim remedial action proposed for the High Priority Sites (881 Hillside Area) at the Rocky Flats Plant (RFP). This interim action is to be conducted to minimize the release of hazardous substances from the 881 Hillside Area that pose a potential long-term threat to public health and the environment. This document integrates current site characterization data and environmental analyses required by the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) or Superfund'' process, into an environmental assessment pursuant to the National Environmental Policy Act (NEPA). Characterization of the 881 Hillside Area is continuing. Consequently, a final remedial action has not yet been proposed. Environmental impacts associated with the proposed interim remedial action and reasonable alternatives designed to remove organic and inorganic contaminants, including radionuclides, from alluvial groundwater in the 881 Hillside Area are addressed. 24 refs., 5 figs., 23 tabs.

  16. Comparisons of polar processing diagnostics from 34 years of the ERA-Interim and MERRA reanalyses

    NASA Astrophysics Data System (ADS)

    Lawrence, Z. D.; Manney, G. L.; Minschwaner, K.; Santee, M. L.; Lambert, A.

    2014-12-01

    We present a comprehensive comparison of polar processing diagnostics derived from the National Aeronautics and Space Administration (NASA) Modern Era Retrospective-analysis for Research and Applications (MERRA) and the European Centre for Medium-Range Weather Forecasts (ECMWF) Interim Reanalysis (ERA-Interim). We use diagnostics that focus on meteorological conditions related to stratospheric chemical ozone loss based on temperatures, polar vortex dynamics, and air parcel trajectories to evaluate the effects these reanalyses might have on polar processing studies. Our results show that the agreement between MERRA and ERA-Interim changes significantly over the 34 years from 1979 through 2013 in both hemispheres, and in many cases improves. By comparing our diagnostics during five time periods when an increasing number of higher quality observations were brought into these reanalyses, we show how changes in the data assimilation systems (DAS) of MERRA and ERA-Interim affected their meteorological data. Many of our stratospheric temperature diagnostics show a convergence toward significantly better agreement, in both hemispheres, after 2001 when Aqua and GOES (Geostationary Operational Environmental Satellite) radiances were introduced into the DAS. Other diagnostics, such as the winter mean volume of air with temperatures below polar stratospheric cloud formation thresholds (VPSC) and some diagnostics of polar vortex size and strength, do not show improved agreement between the two reanalyses in recent years when data inputs into the DAS were more comprehensive. The polar processing diagnostics calculated from MERRA and ERA-Interim agree much better than those calculated from earlier reanalysis datasets. We still, however, see fairly large relative biases in many of the diagnostics in years prior to 2002, raising the possibility that the choice of one reanalysis over another could significantly influence the results of polar processing studies. After 2002, we see

  17. Comparisons of polar processing diagnostics from 34 years of the ERA-Interim and MERRA reanalyses

    NASA Astrophysics Data System (ADS)

    Lawrence, Z. D.; Manney, G. L.; Minschwaner, K.; Santee, M. L.; Lambert, A.

    2015-04-01

    We present a comprehensive comparison of polar processing diagnostics derived from the National Aeronautics and Space Administration (NASA) Modern Era Retrospective-analysis for Research and Applications (MERRA) and the European Centre for Medium-Range Weather Forecasts (ECMWF) Interim Reanalysis (ERA-Interim). We use diagnostics that focus on meteorological conditions related to stratospheric chemical ozone loss based on temperatures, polar vortex dynamics, and air parcel trajectories to evaluate the effects these reanalyses might have on polar processing studies. Our results show that the agreement between MERRA and ERA-Interim changes significantly over the 34 years from 1979 to 2013 in both hemispheres and in many cases improves. By comparing our diagnostics during five time periods when an increasing number of higher-quality observations were brought into these reanalyses, we show how changes in the data assimilation systems (DAS) of MERRA and ERA-Interim affected their meteorological data. Many of our stratospheric temperature diagnostics show a convergence toward significantly better agreement, in both hemispheres, after 2001 when Aqua and GOES (Geostationary Operational Environmental Satellite) radiances were introduced into the DAS. Other diagnostics, such as the winter mean volume of air with temperatures below polar stratospheric cloud formation thresholds (VPSC) and some diagnostics of polar vortex size and strength, do not show improved agreement between the two reanalyses in recent years when data inputs into the DAS were more comprehensive. The polar processing diagnostics calculated from MERRA and ERA-Interim agree much better than those calculated from earlier reanalysis data sets. We still, however, see fairly large differences in many of the diagnostics in years prior to 2002, raising the possibility that the choice of one reanalysis over another could significantly influence the results of polar processing studies. After 2002, we see overall

  18. 76 FR 5564 - Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-01

    ... Patent and Trademark Office Grant of Interim Extension of the Term of U.S. Patent No. 4,971,802; MIFAMURTIDE AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Notice of interim patent term.... 156(d)(5) for a fourth one-year interim extension of the term of U.S. Patent No. 4,971,802....

  19. Monitoring versus interim analysis of clinical trials: a perspective from the pharmaceutical industry.

    PubMed

    Enas, G G; Dornseif, B E; Sampson, C B; Rockhold, F W; Wuu, J

    1989-03-01

    The definitions of "interim analysis" and "monitoring" of clinical trials are often ambiguous in the current literature. The resulting confusion can lead to erroneous conclusions and misguided decisions, especially when activities that are operational or observational are evaluated in a probabilistic sense as inferential. The authors seek to define "interim analysis" and "monitoring" in a mutually exclusive fashion. These definitions will then provide the opportunity to review and categorize existing clinical trial practices and procedures. This will clarify such issues as "when to look" and "when to pay a price" (e.g., test size and power) and characterize such issues in the context of pharmaceutical industry drug development. PMID:2702837

  20. Early rehabilitation of facial defects using interim removable prostheses: A clinical case report

    PubMed Central

    Ramkumar, Vivekanandhan; Sangeetha, Arunachalam

    2013-01-01

    Surgical resection of neoplasms or malformations of the face may result in defects that are not amenable to immediate surgical reconstruction. Such defects can have a severe adverse effect on patient perceptions of body image and self-esteem. In these cases, the use of an interim removable facial prosthesis can offer a rapid alternative treatment solution. The patient may then resume social interactions more comfortably while permitting easy access to the facial defect to observe tissue healing while awaiting definitive rehabilitation. This article presents a case report describing the use of interim nasal prostheses to provide rapid patient rehabilitation of facial defects. PMID:23956597

  1. Suggested state regulations for control of radiation. Volume 1. Ionizing radiation (interim revision)

    SciTech Connect

    Not Available

    1987-06-01

    The interim revision if Volume I includes amendments to Part C (Licensing of Radioactive Material), Part D (Standards for Protection Against Radiation), Part F (X Rays in the Healing Arts), and Part G (Use of Sealed Radioactive Sources in the Healing Arts); and a complete new Part M (Licensing Requirements for Land Disposal of Radioactive Waste). The main purpose of the interim revision is to provide companion regulations consistent and in conformity with certain amendments to Federal standards in 10 CFR Part 20, Part 35, and Part 61 and in 21 CFR Part 1020.

  2. 1987 Federal interim storage fee study: A technical and economic analysis

    SciTech Connect

    Not Available

    1987-09-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This information in the report, which was prepared by E.R. Johnson Associates under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program, which was mandated by the Nuclear Waste Policy Act of 1982. The information in this report will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1988. 13 tabs.

  3. 1988 Federal Interim Storage Fee study: A technical and economic analysis

    SciTech Connect

    Not Available

    1988-11-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). The information in this report, which was prepared by E.R. Johnson Associates, Inc., under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program. The FIS Program was mandated by the Nuclear Waste Policy Act of 1982. The information will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1989. 13 refs.

  4. Atmospheric Effects of Subsonic Aircraft: Interim Assessment Report of the Advanced Subsonic Technology Program

    NASA Technical Reports Server (NTRS)

    Friedl, Randall R. (Editor)

    1997-01-01

    This first interim assessment of the subsonic assessment (SASS) project attempts to summarize concisely the status of our knowledge concerning the impacts of present and future subsonic aircraft fleets. It also highlights the major areas of scientific uncertainty, through review of existing data bases and model-based sensitivity studies. In view of the need for substantial improvements in both model formulations and experimental databases, this interim assessment cannot provide confident numerical predictions of aviation impacts. However, a number of quantitative estimates are presented, which provide some guidance to policy makers.

  5. A novel technique for the direct fabrication of fixed interim restorations.

    PubMed

    Konstantinidis, Ioannis; Kotsakis, Georgios; Pallis, Konstantinos; Walter, Michael Horst

    2013-03-01

    This article describes an alternative technique for the fabrication of interim restorations. A thermoplastic, vacuum-formed template and translucent vinyl polysiloxane material are combined in the waxed diagnostic cast to fabricate a matrix in which the interim material can be placed. With this matrix, a variety of materials, such as dual-polymerized or light-polymerized resins, can be used in a predictable way. The major advantage of this technique is that it allows for the fabrication of accurate restorations with excellent reproduction of surface anatomy and for alterations of the tooth shape with light-polymerized materials. PMID:23522370

  6. Training with the International Space Station interim resistive exercise device

    NASA Technical Reports Server (NTRS)

    Schneider, Suzanne M.; Amonette, William E.; Blazine, Kristi; Bentley, Jason; Lee, Stuart M C.; Loehr, James A.; Moore, Alan D Jr; Rapley, Michael; Mulder, Edwin R.; Smith, Scott M.

    2003-01-01

    A unique, interim elastomer-based resistive exercise device (iRED) is being used on the International Space Station. PURPOSE: This study characterized iRED training responses in a 1-g environment by: 1) determining whether 16 wk of high-intensity training with iRED produces increases in muscle strength and volume and bone mineral density (BMD), 2) comparing training responses with iRED to free weights, and 3) comparing iRED training responses at two training volumes. METHODS: Twenty-eight untrained men were assigned to four groups of seven subjects each: a no exercise control group (CON), an iRED group who trained with three sets/exercise (iRED3), a free-weight group (FW) who trained with three sets/exercise, and an iRED group who trained with six sets/exercise (iRED6). Training exercises included squat (SQ), heel raise (HR), and dead lift (DL) exercises, 3 d.wk(-1) for 16 wk. RESULTS: For CON, no changes occurred pre- to posttraining. For iRED3, increases (P< or =0.05) in one-repetition maximum (1-RM) strength (SQ 21 +/- 4%, HR 17 +/- 4%, DL 29 +/- 5%), leg lean mass (3.1 +/- 0.5%) by dual energy x-ray absorptiometry (DXA), and thigh (4.5 +/- 0.9%) and calf (5.9 +/- 0.7%) muscle volume (by magnetic resonance imaging) occurred after training with no changes in BMD (DXA). For FW, increases in 1-RM strength (SQ 22 +/- 5%, HR 24 +/- 3%, DL 41 +/- 7%), whole body (3.0 +/- 1.1%) and leg lean mass (5.4 +/- 1.2%), thigh (9.2 +/- 1.3%) and calf (4.2 +/- 1.0%) muscle volumes, and lumbar BMD (4.2 +/- 0.7%) occurred after training. For iRED6, all responses were similar to iRED3. CONCLUSION: High-intensity training with the iRED produced muscle responses similar to FW but was not effective in stimulating bone. Bed rest and spaceflight studies are needed to evaluate the effectiveness of the iRED to prevent microgravity deconditioning.

  7. Plutonium Immobilization Form Development Interim and Final Data Report Summaries

    SciTech Connect

    VanKonynenburg, R.; Ebbinghaus, B.

    2000-06-01

    Contained within this report are summaries of the available interim and final data summary reports provided by ANSTO, ANL, LLNL, and WSRC in support of work in the Form Development activity in the Plutonium Immobilization Development and Testing Program. Milestone reports and technical papers prepared for journals or conference proceedings are not included in this list. This document covers work from about 1997 to the present. All of the following reports are available from the Plutonium Immobilization Program Document Control Center (DCC) at LLNL. In most cases, the documents can also be obtained from the libraries the originating site or from the document's authors. All samples of the various formulations discussed in the following summaries were prepared by one of four processes: Wet-milling, dry-milling, an alkoxide-nitrate process, or attritor milling. The fabrication processes differ primarily in the mixing steps. The wet milling process is the one most commonly used. It is a simple ball milling process where water is added that provides intimate mixing of the materials. The dry milling process is a worst case dry mixing process. The alkoxide-nitrate process provides for very intimate mixing and is used when equilibrium samples are desired. The attritor milling process simulates the process being developed for the Plutonium Immobilization Plant. After mixing, the subsequent calcination and consolidation steps are generally the same. Most samples were consolidated by cold pressing and sintering although some of the earlier samples or Some of the single-phase samples were prepared by hot pressing. The sample identification numbers (ID's) that are referenced in the summaries (e.g. A-0, B3-13, etc.) are described in the Sample Test Matrix (PIP-99-012 and PIP-00-016). Samples which contain both plutonium and uranium are given the designation Hf-Pu-U samples. When Ce was used as a surrogate for Pu, the designation is Hf-Ce-U. When Th was used as a surrogate for Pu

  8. Who's Dean Today? Acting and Interim Management as Paradoxes of the Contemporary University

    ERIC Educational Resources Information Center

    McWilliam, Erica; Bridgstock, Ruth; Lawson, Alan; Evans, Terry; Taylor, Peter

    2008-01-01

    Interim, discontinuous or "acting" management is an increasingly ubiquitous feature of universities. This paper asks: What are the implications of this for good academic governance? Should we understand this managerial dance as a symptom of the collapse of good managerial order or, by contrast, as a symptom of the robustness and flexibility of the…

  9. 77 FR 65366 - Interim Procedures for Considering Requests From the Public for Textile and Apparel Safeguard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    .... 8818, 77 FR 29519 (May 18, 2012). Background Title III, Subtitle B, Section 321 through Section 328 of... IMPLEMENTATION OF TEXTILE AGREEMENTS [Docket :121018560-2560-01; OMB Control :0625-0271 (Expiration: 10/31/2015)] RIN 0625-XC003 Interim Procedures for Considering Requests From the Public for Textile and...

  10. 78 FR 31886 - Interim Procedures for Considering Requests From the Public for Textile and Apparel Safeguard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-28

    ... 321 through Section 328 of the Implementation Act and Proclamation No. 8894, 77 FR 66507 (November 5... IMPLEMENTATION OF TEXTILE AGREEMENTS [Docket : 130430427-3427-01; OMB Control : 0625-0274 (Expiration: 04/30/2016)] RIN 0625-XC006 Interim Procedures for Considering Requests From the Public for Textile and...

  11. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent...

  12. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent...

  13. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent...

  14. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent...

  15. 46 CFR 308.302 - Issuance of interim binder; terms and conditions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OPERATIONS WAR RISK INSURANCE Second Seamen's War Risk Insurance § 308.302 Issuance of interim binder; terms..., conditions, and warranties contained in the application for Second Seamen's war risk insurance (set forth in § 308.3) and the Second Seamen's War Risk Policy (1955) (set forth in § 308.306) to the same extent...

  16. Safety evaluation for the interim stabilization of Tank 241-C-103

    SciTech Connect

    Geschke, G.R.

    1995-03-01

    This document provides the basis for interim stabilization of tank 241-C-103. The document covers the removal of the organic liquid layer and the aqueous supernatant from tank 241-C-103. Hazards are identified, consequences are calculated and controls to mitigate or prevent potential accidents are developed.

  17. 40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Emission Standards and Related Requirements § 1048.145 Are there interim provisions that... with applicable emission standards. (c) (d) Tier 1 deterioration factors. For Tier 1 engines, base...

  18. 40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Emission Standards and Related Requirements § 1048.145 Are there interim provisions that... with applicable emission standards. (c) [Reserved] (d) Tier 1 deterioration factors. For Tier 1...

  19. 40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Emission Standards and Related Requirements § 1048.145 Are there interim provisions that... with applicable emission standards. (c) (d) Tier 1 deterioration factors. For Tier 1 engines, base...

  20. 40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Emission Standards and Related Requirements § 1048.145 Are there interim provisions that... with applicable emission standards. (c) (d) Tier 1 deterioration factors. For Tier 1 engines, base...

  1. 40 CFR 1048.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW, LARGE NONROAD SPARK-IGNITION ENGINES Emission Standards and Related Requirements § 1048.145 Are there interim provisions that... with applicable emission standards. (c) (d) Tier 1 deterioration factors. For Tier 1 engines, base...

  2. A Study of the Transitional Adjustment of a Professional Group to its Altered Role. Interim Report.

    ERIC Educational Resources Information Center

    Daniels, Morris J.

    This interim report discusses the adjustments auditing firms are making as a result of the advent of the computer. Data were obtained from (1) a review of the literature, (2) attendance at professional association meetings, and (3) a series of interviews with accountants. The findings to date indicate that the normative patterns governing the…

  3. 40 CFR 57.302 - Performance level of interim constant controls.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... exceed the following: (i) For sulfuric acid plants on copper smelters, 12-hour running average; (ii) For... smelters, 2-hour running average; (iv) For dimethylaniline (DMA) scrubbing units on copper smelters, 2-hour... 40 Protection of Environment 5 2010-07-01 2010-07-01 false Performance level of interim...

  4. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2011-10-01 2011-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  5. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2010-10-01 2010-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  6. Sample Results From The Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples

    SciTech Connect

    Peters, T. B.; Fink, S. D.

    2012-12-20

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified.

  7. Sample Results from the Interim Salt Disposition Program Macrobatch 6 Tank 21H Qualification Samples

    SciTech Connect

    Peters, T. B.; Fink, S. D.

    2012-12-11

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 6 for the Interim Salt Disposition Project (ISDP). This document reports partial results of the analyses of samples of Tank 21H. No issues with the projected Salt Batch 6 strategy are identified.

  8. 12 CFR 303.24 - Application for deposit insurance for an interim institution.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Application for deposit insurance for an interim institution. 303.24 Section 303.24 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF PRACTICE FILING PROCEDURES Deposit Insurance § 303.24 Application for...

  9. 12 CFR 303.24 - Application for deposit insurance for an interim institution.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Application for deposit insurance for an interim institution. 303.24 Section 303.24 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION PROCEDURE AND RULES OF PRACTICE FILING PROCEDURES Deposit Insurance § 303.24 Application for...

  10. 78 FR 63276 - Interim Policy, FAA Review of Solar Energy System Projects on Federally Obligated Airports

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Federal Aviation Administration Interim Policy, FAA Review of Solar Energy System Projects on Federally... federally obligated airports to construct solar energy systems on airport property. FAA is adopting an... for measuring ocular impact of proposed solar energy systems which are effective upon publication....

  11. 77 FR 74512 - Interim Policy Leasing for Renewable Energy Data Collection Facility on the Outer Continental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... leases, easements and rights-of-way on the OCS for alternative energy activities. The Secretary delegated... renewable energy activities and initiatives (73 FR 21152). BOEM also took into consideration the importance... Bureau of Ocean Energy Management Interim Policy Leasing for Renewable Energy Data Collection Facility...

  12. 76 FR 76046 - Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... approval of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD or... Valley Unified Air Pollution Control District (``SJVUAPCD'' or ``District'') Rules 2020 (Exemptions) and... AGENCY 40 CFR Part 52 Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified...

  13. 78 FR 894 - Interim Final Determination To Stay Sanctions, Imperial County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... AGENCY 40 CFR Part 52 Interim Final Determination To Stay Sanctions, Imperial County Air Pollution... of revisions to the Imperial County Air Pollution Control District (ICAPCD) portion of the California...- line instructions. 2. Email: steckel.andrew@epa.gov . 3. Mail or deliver: Andrew Steckel (Air-4),...

  14. 76 FR 45199 - Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ... of revisions to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of... Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference... AGENCY 40 CFR Part 52 Interim Final Determination To Defer Sanctions, San Joaquin Valley Unified...

  15. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-16

    The document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of S/SX and U Tank Farms.

  16. 40 CFR 281.51 - Amendment required at end of interim period.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Amendment required at end of interim period. 281.51 Section 281.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) APPROVAL OF STATE UNDERGROUND STORAGE TANK PROGRAMS Approval Procedures §...

  17. 77 FR 34399 - Public Housing Assessment System (PHAS): Capital Fund Interim Scoring Notice; Request for Comment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    .../ . SUPPLEMENTARY INFORMATION: I. Background The PHAS interim rule, published on February 23, 2011, at 76 FR 10136... Fund Scoring Notice, also published on February 23, 2011, at 76 FR 10053. Under this indicator, PHAs... 10276, Washington, DC 20410-0500. 2. Electronic Submission of Comments. Interested persons may...

  18. Breaking the Cycle of Drug Abuse. 1993 Interim National Drug Control Strategy.

    ERIC Educational Resources Information Center

    Office of National Drug Control Policy, Washington, DC.

    This Interim Drug Strategy is intended to give a new sense of direction and to reinvigorate the nation's efforts against drug trafficking and abuse. The preface to the report lists eight new strategies that the Administration will implement: (1) make drug policy a cornerstone of domestic and social policy; (2) target pregnant women, children, and…

  19. Barrier Free Access to the Man-Made Environment - A Review of Current Literature. Interim Report.

    ERIC Educational Resources Information Center

    Steinfeld, Edward

    Reviewed in the interim report on revision of the existing American National Standards Institute provision is current literature on barrier free design for disabled individuals. The report addresses the following topics: the history of access as a civil right; demographic aspects (including information on task dysfunctions of disabled persons…

  20. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Review and Approval § 300.20 Interim acceptance and review of Bonneville Power Administration rates. (a) Opportunity to comment. The Commission will publish in the Federal Register notice of any filing made...

  1. An Interim Report on Pennsylvania's Framework for Leadership: Frequently Asked Questions

    ERIC Educational Resources Information Center

    Bing-ru, Teh; Chiang, Hanley; Lipscomb, Stephen; Gill, Brian

    2014-01-01

    A new study analyzed data from the 2012/13 pilot of the Framework for Leadership (FFL), Pennsylvania's tool for evaluating the leadership practices of principals and assistant principals. Based on the FFL scores of 336 principals and 69 assistant principals evaluated by their supervisors in the 2012/13 school year, this interim report found that…

  2. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER...

  3. Flammability, Offgassing, and Compatibility Requirements and Test Procedures. Interim NASA Technical Standard

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This Interim Standard establishes requirements for evaluation, testing, and selection of materials that are intended for use in space vehicles, associated Ground Support Equipment (GSE), and facilities used during assembly, test, and flight operations. Included are requirements, criteria, and test methods for evaluating the flammability, offgassing, and compatibility of materials.

  4. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a...

  5. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a...

  6. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a...

  7. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a...

  8. 49 CFR 194.7 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY RESPONSE PLANS FOR ONSHORE OIL PIPELINES General § 194.7 Operating restrictions and interim..., may not handle, store, or transport oil in that pipeline unless the operator has submitted a...

  9. Interim Assessment Data: A Case Study on Modifying Instruction Based on Benchmark Feedback

    ERIC Educational Resources Information Center

    Lange, Tracey M.

    2014-01-01

    The role of data analysis in the jobs of instructional leaders has become as commonplace as teachers creating lesson plans and taking roll in the classroom. Teachers and building leaders routinely use interim assessment data to develop thoughtful and robust instructional plans that address identified areas of student need. The link between the…

  10. 76 FR 40777 - Interim Enforcement Policy for Certain Fire Protection Issues

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Register notice Date Brief description 69 FR 33684 June 16, 2004 Describes the initial interim Enforcement Policy on fire protection. 70 FR 2662 January 14, 2005 Revises the submittal date for licensees to receive enforcement discretion for existing identified fire protection program noncompliant issues. 71...

  11. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... using Revision 3 of the Nuclear Energy Institute's (NEI) document, NEI 97-06, ``Steam Generator Program... From the Federal Register Online via the Government Publishing Office NUCLEAR REGULATORY COMMISSION Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear...

  12. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…

  13. Making the Transition: Interim Results of the National Guard Youth ChalleNGe Evaluation. [Executive Summary

    ERIC Educational Resources Information Center

    Millenky, Megan; Bloom, Dan; Dillon, Colleen

    2010-01-01

    Young people who drop out of high school face long odds of success in a labor market that increasingly values education and skills. This report presents interim results from a rigorous, ongoing evaluation of the National Guard Youth ChalleNGe Program, which aims to "reclaim the lives of at-risk youth" who have dropped out of high school. ChalleNGe…

  14. 77 FR 50016 - Extension of Interim Final Temporary Rule on Retail Foreign Exchange Transactions; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... rule published at FR 77 41671, on July 16, 2012 should be received on or before October 31, 2012... From the Federal Register Online via the Government Publishing Office SECURITIES AND EXCHANGE COMMISSION 17 CFR Part 240 RIN 3235-AL19 Extension of Interim Final Temporary Rule on Retail Foreign...

  15. National Study of Student Support Services. Interim Report: Volume I: Program Implementation.

    ERIC Educational Resources Information Center

    Cahalan, Margaret; And Others

    This is the first interim report of the congressionally mandated National Study of Student Support Services (SSS), a federally funded grant program designed to help economically disadvantaged students achieve success at the postsecondary level. The program is intended to facilitate disadvantaged students' high school completion, entry into and…

  16. 40 CFR 271.24 - Interim authorization under section 3006(g) of RCRA.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... revised Corrective Action Management Unit rule (except 40 CFR 264.555) promulgated on January 22, 2002 and... 3006(g) of RCRA. 271.24 Section 271.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Requirements for Final Authorization § 271.24 Interim authorization under section 3006(g) of RCRA. (a)...

  17. 40 CFR 271.24 - Interim authorization under section 3006(g) of RCRA.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... revised Corrective Action Management Unit rule (except 40 CFR 264.555) promulgated on January 22, 2002 and... 3006(g) of RCRA. 271.24 Section 271.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Requirements for Final Authorization § 271.24 Interim authorization under section 3006(g) of RCRA. (a)...

  18. 40 CFR 271.24 - Interim authorization under section 3006(g) of RCRA.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... revised Corrective Action Management Unit rule (except 40 CFR 264.555) promulgated on January 22, 2002 and... 3006(g) of RCRA. 271.24 Section 271.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Requirements for Final Authorization § 271.24 Interim authorization under section 3006(g) of RCRA. (a)...

  19. 40 CFR 271.24 - Interim authorization under section 3006(g) of RCRA.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... revised Corrective Action Management Unit rule (except 40 CFR 264.555) promulgated on January 22, 2002 and... 3006(g) of RCRA. 271.24 Section 271.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Requirements for Final Authorization § 271.24 Interim authorization under section 3006(g) of RCRA. (a)...

  20. 40 CFR 271.24 - Interim authorization under section 3006(g) of RCRA.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... revised Corrective Action Management Unit rule (except 40 CFR 264.555) promulgated on January 22, 2002 and... 3006(g) of RCRA. 271.24 Section 271.24 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Requirements for Final Authorization § 271.24 Interim authorization under section 3006(g) of RCRA. (a)...

  1. 33 CFR 155.1025 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... emergency plan approved by the flag state that meets the requirements of Regulation 37 of Annex I to the... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1025 Operating restrictions and interim... operating in compliance with a plan approved under § 155.1065: (1) Handling, storing, or transporting oil...

  2. 33 CFR 155.1025 - Operating restrictions and interim operating authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... emergency plan approved by the flag state that meets the requirements of Regulation 37 of Annex I to the... REGULATIONS FOR VESSELS Tank Vessel Response Plans for Oil § 155.1025 Operating restrictions and interim... operating in compliance with a plan approved under § 155.1065: (1) Handling, storing, or transporting oil...

  3. 75 FR 64955 - Countermeasures Injury Compensation Program (CICP): Administrative Implementation; Interim Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF HEALTH AND HUMAN SERVICES 42 CFR Part 110 RIN 0906-AA83 Countermeasures Injury Compensation Program (CICP): Administrative Implementation; Interim Final Rule Correction In rule document 2010-25110 beginning on page...

  4. CCSS Literacy and Math Tools: An Interim Report on Implementation and Sustainability during the Pilot Year

    ERIC Educational Resources Information Center

    Reumann-Moore, Rebecca; Lawrence, Nancy; Sanders, Felicia; Shaw, Kate; Christman, Jolley Bruce

    2011-01-01

    This document summarizes the findings from the initial round of research on the development and piloting of two types of instructional tools designed to support teachers' integration of the Common Core State Standards (CCSS) in literacy and math. In this interim report, Research for Action (RFA) presents key findings from the first half of the…

  5. Interim Performance Objectives. Progress Report, 3rd Quarter Fiscal Year 1999.

    ERIC Educational Resources Information Center

    Office of Student Financial Assistance (ED), Washington, DC.

    This document contains a progress report on three categories of interim performance objectives outlined by the Office of Student Financial Assistance (OSFA) in winter 1999. These objectives were to: (1) improve customer service; (2) reduce the overall cost of delivering student aid; and (3) transform the OSFA into a performance-based organization.…

  6. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring FY10 Report

    SciTech Connect

    Zhang, Z. F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2011-01-01

    The U.S. Department of Energy’s Office of River Protection has constructed interim surface barriers over a portion of the T and TY tank farms as part of the Interim Surface Barrier Demonstration Project. The interim surface barriers (hereafter referred to as the surface barriers or barriers) are designed to minimize the infiltration of precipitation into the soil zones containing radioactive contaminants and minimize the movement of the contaminants. As part of the demonstration effort, vadose zone moisture is being monitored to assess the effectiveness of the barriers at reducing soil moisture. Solar-powered systems were installed to continuously monitor soil water conditions at four locations in the T (i.e., instrument Nests TA, TB, TC, and TD) and the TY (i.e., instrument Nests TYA and TYB) Farms beneath the barriers and outside the barrier footprint as well as site meteorological conditions. Nests TA and TYA are placed in the area outside the barrier footprint and serve as controls, providing subsurface conditions outside the influence of the surface barriers. Nest TB provides subsurface measurements to assess surface-barrier edge effects. Nests TC, TD, and TYB are used to assess changes in soil-moisture conditions beneath the interim surface barriers.

  7. AACP Special Taskforce on Diversifying Our Investment in Human Capital Interim Update

    PubMed Central

    White, Carla; Adams, Jennifer

    2016-01-01

    EXECUTIVE SUMMARY The 2015-2017 AACP Special Taskforce on Diversifying our Investment in Human Capital was appointed for a two-year term, therefore the interim update from the Taskforce. A full report will be provided in 2017 in the form of a white paper for academic pharmacy on diversifying our investment in human capital. PMID:27756938

  8. Alternatives generation and analysis report for immobilized low-level waste interim storage architecture

    SciTech Connect

    Burbank, D.A., Westinghouse Hanford

    1996-09-01

    The Immobilized Low-Level Waste Interim Storage subproject will provide storage capacity for immobilized low-level waste product sold to the U.S. Department of Energy by the privatization contractor. This report describes alternative Immobilized Low-Level Waste storage system architectures, evaluation criteria, and evaluation results to support the Immobilized Low-Level Waste storage system architecture selection decision process.

  9. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Petitions for waiver, and applications for interim waiver... the Assistant Secretary for Energy Efficiency and Renewable Energy, U.S. Department of Energy. Each... written notification include a statement that the Assistant Secretary for Energy Efficiency and...

  10. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Petitions for waiver, and applications for interim waiver... the Assistant Secretary for Energy Efficiency and Renewable Energy, U.S. Department of Energy. Each... written notification include a statement that the Assistant Secretary for Energy Efficiency and...

  11. 78 FR 6068 - Proposed Information Collection; Comment Request; Interim Procedures for Considering Requests...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-29

    ... Burden for Collection of Information, (74 FR 41111). The intent of the U.S.-Peru TPA Commercial.... 8341, 74 FR 4105). Interim procedures to implement these responsibilities were published in the Federal... Considering Requests Under the Commercial Availability Provision of the United States--Peru Trade...

  12. 77 FR 4758 - Foreign-Trade Zone 59-Lincoln, Nebraska, Application for Temporary/Interim Manufacturing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-31

    ... Manufacturing Authority, Novartis Consumer Health, Inc. (Pharmaceutical Product Manufacturing), Lincoln, NE An... Lincoln Foreign-Trade Zone, Inc., grantee of FTZ 59, requesting temporary/interim manufacturing (T/ IM... request to the FTZ Board for FTZ manufacturing authority beyond a two-year period, which may...

  13. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution... sent by e-mail to: chad.t.privett@us.army.mil or george.alie@us.army.mil . FOR FURTHER...

  14. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution... information may be sent by e-mail to: tony.mayo@us.army.mil or jessica.c.hamilton@us.army.mil . FOR...

  15. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution.... Request for additional information may be sent by e-mail to: chad.t.privett@us.army.mil or...

  16. 75 FR 36643 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. ACTION: Notice. SUMMARY: The Military Surface Deployment and....privett@us.army.mil or george.alie@us.army.mil . FOR FURTHER INFORMATION CONTACT: Mr. Chad Privett,...

  17. Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 1: Summary and Issues.

    ERIC Educational Resources Information Center

    CSR, Inc., Washington, DC.

    This first volume of the interim report on the Study of New Youth Initiatives in Apprenticeship presents a discussion of site visit findings and implementation issues related to the United States Department of Labor's Apprenticeship-School Linkage Demonstrations. (Volume 2, site visit reports, is available separately as CE 032 792.) Chapter 1…

  18. Study of New Youth Initiatives in Apprenticeship. Interim Report. Volume 2: Site Visit Reports.

    ERIC Educational Resources Information Center

    CSR, Inc., Washington, DC.

    This second volume of the interim report provides detailed case study reports on each of the eight Youth Apprenticeship Projects. (Volume 1, an overview of data from the site visits, is available separately as CE 032 791.) Discussion areas covered in each site visit report are local context/operational environment, administrative information,…

  19. 76 FR 59394 - Energy Conservation Program for Consumer Products: Publication of the Extension of Interim Waiver...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... multiple defrost cycles, and requested comments on Samsung's petition. 76 FR 16760 (March 25, 2011... comment period on its interim final rule for the refrigerator test procedure. 76 FR 57612 (Sept. 15, 2011...) 586-9611. E-mail: Michael.Raymond@ee.doe.gov . Ms. Elizabeth Kohl, U.S. Department of Energy,...

  20. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No... INFORMATION: Reference: Military Freight Traffic Unified Rules Publications (MFTURP) No. 1. Background:...

  1. Design Analysis Report for 244-AR Interim Stabilization Exhaust Ventilation Ducting

    SciTech Connect

    RUTHERFORD, J.

    2002-11-21

    This report documents the design analysis performed for the exhaust ducting associated with the 244-AR Interim Stabilization Project. The exhaust ducting connects portable exhausters PORO5 and PORO6 to the existing east dog house of the 291-AR filter vault and the vessel ventilation system. This analysis examines loads on the ductwork and ductwork supports.

  2. 14 CFR 60.21 - Interim qualification of FSTDs for new aircraft types or models.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... aircraft types or models. 60.21 Section 60.21 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) AIRMEN FLIGHT SIMULATION TRAINING DEVICE INITIAL AND CONTINUING QUALIFICATION AND USE § 60.21 Interim qualification of FSTDs for new aircraft types or models. (a) A sponsor...

  3. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2014-10-01 2014-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  4. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2012-10-01 2012-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  5. 46 CFR 8.570 - Interim approval of prototype SIP company or vessel plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of 46 CFR part 2, subpart 2.01 of this chapter. ... 46 Shipping 1 2013-10-01 2013-10-01 false Interim approval of prototype SIP company or vessel... of prototype SIP company or vessel plans. (a) A company operating under an approved prototype...

  6. Interim Report on the Emergency Veterans' Job Training Act of 1983--Public Law 98-77.

    ERIC Educational Resources Information Center

    Veterans Administration, Washington, DC.

    The first interim report focuses on administration of the Emergency Veterans' Job Training Act, which established an emergency program of job training assistance for unemployed Korean Conflict and Vietnam-era veterans. It describes implementation processes undertaken by the Veterans Administration and the Department of Labor and their outreach and…

  7. Interim Action Record of Decision Remedial Alternative Selection Met Lab HWMF

    SciTech Connect

    Palmer, E.

    2001-09-25

    The purpose of this interim action for the Metallurgical Laboratory HWMF Operable Unit is to minimize migration of contaminants to groundwater from the Metallurgical Laboratory Basin sediments and sediments associated with the process sewer line while risk assessment activities for the Carolina Bay are being planned and conducted.

  8. Transitional Leadership: Perceptions of Interim Mid-Level Student Affairs Professionals

    ERIC Educational Resources Information Center

    Boerner, William A.

    2011-01-01

    It has been estimated that, due to increased turnover, an aging population, growing complexities and sizes of institutions, as well as the bureaucratization of searches, college and universities will see a continued increase in the utilization of interim leadership (Padilla, 2004). Student affairs divisions are not immune to this phenomenon and…

  9. Do Interim Assessments Influence Instructional Practice in Year One? Evidence from Indiana Elementary School Teachers

    ERIC Educational Resources Information Center

    Chojnacki, Gregory; Eno, Jared; Liu, Feng; Meyers, Coby; Konstantopoulos, Spyros; Miller, Shazia; van der Ploeg, Arie

    2013-01-01

    Recent work that has examined the impact of what are variously called periodic, interim, benchmark, or diagnostic assessments, typically administered three or four times during a school year, has produced mixed findings. For instance, one study reported small significant effects in mathematics in grades 3-8, but not in reading (Carlson et al.,…

  10. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ... Human Drug Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic... entitled ``Interim Product Reporting for Human Drug Compounding Outsourcing Facilities Under Section 503B... register as outsourcing facilities (outsourcing facilities). DATES: Although you can comment on...

  11. Prospects: The Congressionally Mandated Study of Educational Growth and Opportunity. The Interim Report.

    ERIC Educational Resources Information Center

    Puma, Michael J.; And Others

    This publication is the first interim report from the Congressionally Mandated Study of Educational Growth and Opportunity (Prospects), and describes students' characteristics and the schools they attend. Prospects is designed to evaluate the short- and long-term consequences of Chapter 1 program participation by following for 5 years large…

  12. Engineering report single-shell tank farms interim measures to limit infiltration through the vadose zone

    SciTech Connect

    HAASS, C.C.

    1999-10-14

    Identifies, evaluates and recommends interim measures for reducing or eliminating water sources and preferential pathways within the vadose zone of the single-shell tank farms. Features studied: surface water infiltration and leaking water lines that provide recharge moisture, and wells that could provide pathways for contaminant migration. An extensive data base, maps, recommended mitigations, and rough order of magnitude costs are included.

  13. Testimony of Nationally Representative Groups. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    As the 12th in a series of interim reports prepared for the United States Congress on the metric system, this study was authorized by law to reduce uncertainties concerning the issue of converting to metrication and to provide a better basis upon which the Congress may evaluate and resolve it. The testimony of over 230 nationally representative…

  14. The SpringBoard Bursary Foundation Impact Assessment: Year 1. Interim Report

    ERIC Educational Resources Information Center

    Buchanan, Emily; Stevens, Eleanor; Straw, Suzanne

    2014-01-01

    The SpringBoard Bursary Foundation (SpringBoard) commissioned the National Foundation for Education Research (NFER) to undertake an evaluation of its activities and impacts between 2013 and 2018. This interim and summary report presents the findings of the first year of the evaluation. SpringBoard was established in 2012 to transform the lives of…

  15. 26 CFR 1.848-3 - Interim rules for certain reinsurance agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 26 Internal Revenue 8 2011-04-01 2011-04-01 false Interim rules for certain reinsurance agreements. 1.848-3 Section 1.848-3 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY... beginning before January 1, 1992, under a reinsurance agreement entered into after November 14, 1991; and...

  16. Federal Government: Civilian Agencies. U.S. Metric Study Interim Report.

    ERIC Educational Resources Information Center

    National Bureau of Standards (DOC), Washington, DC.

    This second interim report on the feasibility of a United States changeover to a metric system stems from the U.S. Metric Study, which was authorized by Public Law 90-472, and was prepared by the National Bureau of Standards to provide a better basis for Congressional evaluation of this issue. Participating in this national survey were 55 federal…

  17. Designing Their Own: Increasing Urban High School Teacher Capacity for Creating Interim Assessments

    ERIC Educational Resources Information Center

    Ado, Kathryn

    2013-01-01

    This case study analyzes and documents factors that affect teacher learning and instructional practices in connection to the design your own (DYO) interim or periodic assessment process at one newly developed high school in New York City. Examining these factors through Riggan and Nabors Olah's (2011) conceptual framework offers insights into…

  18. 47 CFR 90.237 - Interim provisions for operation of radioteleprinter and radiofacsimile devices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Interim provisions for operation of radioteleprinter and radiofacsimile devices. 90.237 Section 90.237 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.237...

  19. 47 CFR 90.237 - Interim provisions for operation of radioteleprinter and radiofacsimile devices.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Interim provisions for operation of radioteleprinter and radiofacsimile devices. 90.237 Section 90.237 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Non-Voice and Other Specialized Operations § 90.237...

  20. Interim Policy Options for Commercialization of Solar Heating and Cooling Systems.

    ERIC Educational Resources Information Center

    Bezdek, Roger

    This interim report reviews the major incentive policy options available to accelerate market penetration of solar heating and cooling (SHAC) systems. Feasible policy options designed to overcome existing barriers to commercial acceptance and market penetration are identified and evaluated. The report is divided into seven sections, each dealing…

  1. 78 FR 13073 - Interim Guidance for Revised Implementation of the International Convention for the Prevention of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-26

    ... Revised MARPOL Annex V Implementation.'' On July 15, 2011, the International Maritime Organization's (IMO... SECURITY Coast Guard Interim Guidance for Revised Implementation of the International Convention for the... International Convention for the Prevention of Pollution from Ships (MARPOL) Annex V, by establishing a...

  2. 32 CFR 643.36 - Policy-Interim leasing of excess properties to facilitate economic readjustment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... facilitate economic readjustment. 643.36 Section 643.36 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) REAL PROPERTY REAL ESTATE Policy § 643.36 Policy—Interim leasing of excess... Office of Economic Adjustment, OASD (I&L), will require coordination with the DASD (I&H) and...

  3. Interim-status groundwater monitoring plan for the 216-B-63 trench

    SciTech Connect

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  4. A Reading Program for Mexican-American Children, Third Interim Report. Final Report.

    ERIC Educational Resources Information Center

    Amsden, Constance

    The third and final interim report is devoted to analysis of research data relating to a 3-year experimental reading program for Mexican American children at the Malabar Street School in Los Angeles. The program utilized language development methods, individualized instruction, and parental assistance to improve the children's competencies. Using…

  5. A Reading Program for Mexican-American Children. Second Interim Report.

    ERIC Educational Resources Information Center

    Amsden, Constance

    A second interim report on a reading program for Mexican-American children in an East Los Angeles elementary school notes that reading ability in the primary grades has improved. In January, 1967, the average first grade reading score on the Stanford Reading Test was at the third percentile, whereas in January, 1968, the score was at the eighth…

  6. 10 CFR 431.401 - Petitions for waiver, and applications for interim waiver, of test procedure.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the Assistant Secretary for Energy Efficiency and Renewable Energy, U.S. Department of Energy. Each... written notification include a statement that the Assistant Secretary for Energy Efficiency and Renewable... Assistant Secretary for Energy Efficiency and Renewable Energy. (e) Provisions specific to interim...

  7. CBVE: A Study to Measure Its Effectiveness in Kentucky. Final Report. Interim Period 1.

    ERIC Educational Resources Information Center

    Vincent, Roger D.; Cobb, Robert A.

    An interim study was conducted in Kentucky to determine the effectiveness of Competency Based Vocational Education (CBVE) and to compare its effectiveness to that of traditional teaching methodologies. Research surveys of those directly involved in the implementation of CBVE were used to ascertain if CBVE is meeting its self-stated goals.…

  8. 24 CFR 960.257 - Family income and composition: Regular and interim reexaminations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Family income and composition... and Reexamination § 960.257 Family income and composition: Regular and interim reexaminations. (a... must conduct a reexamination of family income and composition at least annually and must...

  9. 24 CFR 960.257 - Family income and composition: Regular and interim reexaminations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Family income and composition... and Reexamination § 960.257 Family income and composition: Regular and interim reexaminations. (a... must conduct a reexamination of family income and composition at least annually and must...

  10. 24 CFR 960.257 - Family income and composition: Regular and interim reexaminations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Family income and composition... and Reexamination § 960.257 Family income and composition: Regular and interim reexaminations. (a... must conduct a reexamination of family income and composition at least annually and must...

  11. 24 CFR 960.257 - Family income and composition: Regular and interim reexaminations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Family income and composition... and Reexamination § 960.257 Family income and composition: Regular and interim reexaminations. (a... must conduct a reexamination of family income and composition at least annually and must...

  12. 24 CFR 960.257 - Family income and composition: Regular and interim reexaminations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Family income and composition... and Reexamination § 960.257 Family income and composition: Regular and interim reexaminations. (a... must conduct a reexamination of family income and composition at least annually and must...

  13. 65 FR 49788 - Proposed Collection of Information; Comment Request-Amended Interim Safety Standard for Cellulose...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2000-08-15

    ... e-mail to lglatz@cpsc.gov . SUPPLEMENTARY INFORMATION: Cellulose insulation is a form of thermal... Insulation AGENCY: Consumer Product Safety Commission. ACTION: Notice. SUMMARY: As required by the Paperwork... insulation. The collection of information is in regulations implementing the Amended Interim Safety...

  14. 62 FR 45630 - Proposed Collection of Information; Comment RequestAmended Interim Safety Standard for Cellulose...

    Federal Register 2010, 2011, 2012, 2013, 2014

    1997-08-28

    ... INFORMATION: Cellulose insulation is a form of thermal insulation used in houses and other residential... Insulation AGENCY: Consumer Product Safety Commission. ACTION: Notice. SUMMARY: As required by the Paperwork... insulation. The collection of information is in regulations implementing the Amended Interim Safety...

  15. 69 FR 10001 - Proposed Collection of Information; Comment Request-Amended Interim Safety Standard for Cellulose...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2004-03-03

    ... . SUPPLEMENTARY INFORMATION: Cellulose insulation is a form of thermal insulation used in houses and other... Insulation AGENCY: Consumer Product Safety Commission. ACTION: Notice. SUMMARY: As required by the Paperwork... insulation. The collection of information is in regulations implementing the Amended Interim Safety...

  16. 76 FR 9381 - Notice of Availability of Interim Staff Guidance Documents for Spent Fuel Storage Casks

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... dry cask storage systems under Title 10 of the Code of Federal Regulations (10 CFR) part 71 and 10 CFR... COMMISSION Notice of Availability of Interim Staff Guidance Documents for Spent Fuel Storage Casks AGENCY... Gordon, Structural Mechanics and Materials Branch, Division of Spent Fuel Storage and...

  17. Evaluation of Hose in Hose Transfer Line Service Life for Hanford's Interim Stabilization Program

    SciTech Connect

    TORRES, T.D.

    2000-08-24

    RPP-6153, Engineering Task Plan for Hose-in-Hose Transfer System for the Interim Stabilization Program, defines the programmatic goals, functional requirements, and technical criteria for the development and subsequent installation of transfer line equipment to support Hanford's Interim Stabilization Program. RPP-6028, Specification for Hose in Hose Transfer Lines for Hanford's Interim Stabilization Program, has been issued to define the specific requirements for the design, manufacture, and verification of transfer line assemblies for specific waste transfer applications. Included in RPP-6028 are tables defining the chemical constituents of concern to which transfer lines will be exposed. Current Interim Stabilization Program planning forecasts that the at-grade transfer lines will be required to convey pumpable waste for as much as three years after commissioning. Prudent engineering dictates that the equipment placed in service have a working life in excess of this forecasted time period, with some margin to allow for future adjustments to the planned schedule. This document evaluates the effective service life of the Hose-in-Hose Transfer Lines, based on information submitted by the manufacturer and published literature. The effective service life of transfer line assemblies is a function of several factors. Foremost among these are process fluid characteristics, ambient environmental conditions, and the manufacturer's stated shelf life. This evaluation examines the manufacturer's certification of shelf life, the manufacturer's certifications of chemical compatibility with waste, and published literature on the effects of exposure to ionizing radiation on the mechanical properties of elastomeric materials to evaluate transfer line service life.

  18. Engineering Task Plan for Hose In Hose Transfer Lines for the Interim Stabilization Program

    SciTech Connect

    RUNG, M.P.

    2000-06-20

    This document is the Engineering Task Plan for the engineering, design services, planning, project integration and management support for the design, modification, installation and testing of an over ground transfer (OGT) system to support the interim stabilization of nine tanks in the 241-S/SX Tank Farms.

  19. A Model Project in Career Education, K-12. Interim Report, December 1974.

    ERIC Educational Resources Information Center

    Wyoming State Dept. of Education, Cheyenne.

    The document presents an interim report of a project to establish career education programs for K-12 students in the Natrona County School District of Casper, Wyoming. Project activities were divided into: (1) career awareness, grades K-6; (2) career exploration, grades 7-9; (3) career preparation, grades 10-12; and (4) guidance. To meet the…

  20. Interim Service ISDN Satellite (ISIS) network model for advanced satellite designs and experiments

    NASA Technical Reports Server (NTRS)

    Pepin, Gerard R.; Hager, E. Paul

    1991-01-01

    The Interim Service Integrated Services Digital Network (ISDN) Satellite (ISIS) Network Model for Advanced Satellite Designs and Experiments describes a model suitable for discrete event simulations. A top-down model design uses the Advanced Communications Technology Satellite (ACTS) as its basis. The ISDN modeling abstractions are added to permit the determination and performance for the NASA Satellite Communications Research (SCAR) Program.